Automated Procurement System (APS) revised project management plan (DS-03)
NASA Technical Reports Server (NTRS)
Murphy, Diane R.
1995-01-01
The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
Automated Procurement System (APS): Project management plan (DS-03), version 1.2
NASA Technical Reports Server (NTRS)
Murphy, Diane R.
1994-01-01
The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
Air Defense Initiative (ADI) Clutter Model
1998-04-01
Pusey, P. N., 1976 , "A Model for Non-Rayleigh Sea Echo," IEEE AP- 24 , No.6, November 197 6 James, W. J., 1961, The Effect of the Weather in Eastern...system procurement. RADC has been involved in the development of clutter models for system procurements for many years. Between 1976 and 1979, RADC...performed measurements and suggested clutter models for the SEEK IGLOO ( 1976 ) and the SEEK FROST (1978-9) programs. Since 1980, current clutter models
APS deposition facility upgrades and future plans
NASA Astrophysics Data System (ADS)
Conley, Ray; Shi, Bing; Erdmann, Mark; Izzo, Scott; Assoufid, Lahsen; Goetze, Kurt; Mooney, Tim; Lauer, Kenneth
2014-09-01
The Advanced Photon Source (APS) has recently invested resources to upgrade or replace aging deposition systems with modern equipment. Of the three existing deposition systems, one will receive an upgrade, while two are being replaced. A design which adds a three-substrate planetary for the APS rotary deposition system is almost complete. The replacement for the APS large deposition system, dubbed the "Modular Deposition System", has been conceptually designed and is in the procurement process. Eight cathodes will sputter horizontally on mirrors up to 1.5 meters in length. This new instrument is designed to interface with ion-milling instruments and various metrology equipment for ion-beam figuring. A third linear machine, called the APS Profile Coating System, has two cathodes and is designed to accept substrates up to 200mm in length. While this machine is primarily intended for fabrication of figured KB mirrors using the profile-coating technique, it has also been used to produce multilayer monochromators for beamline use.
DMA (Defense Mapping Agency): The Digital Revolution,
1984-06-21
8217 , DEFENSE APPING AGENCY: * TIlE DIGITAL REVOLUTION .. ..4 8 .O44 9 5* ; n : . . ., -. n I , . , : ’ . , , - n .’ ’.’- ;; : - COVER FIGURES Top... orthophoto bases. Development of the Continental Control Network and the procurement of an Off- Line Ortho-Photo System has expanded our ability to obtain
Lowering generic drug prices: less regulation equals more competition.
Anis, Aslam H; Guh, Daphne P; Woolcott, John
2003-01-01
In Ontario, Canada, the 70/90 regulations were instituted in May 1993 to establish provincial government procurement prices for generic drugs. Accordingly, the first generic entrant's price could not exceed 70% of the incumbent's branded price. Subsequent entrants' prices could not exceed 90% of the first entrant's price. These regulations' impact on generic market competitiveness are evaluated. Data on 518 drugs spanning nine therapeutic classifications were collected for the period of 04/01/1987 to 12/31/1998 from Ontario Drug Benefit formulary and IMS Canada. The period 04/01/1987 to 04/30/1993 was defined as the before period (BP) and 05/01/1993 to 12/31/1998 was the after period (AP). We compared the price ratio (P = P(G)/P(B) ) between BP and AP and performed regression analysis to assess the determinants of P. in both the BP and AP decreased as the number of generic firms increased within these periods. However, this decrease in was significantly less in the AP (median: 0.75 --> 0.68 --> 0.67) than in BP (0.71 --> 0.61 --> 0.53) as the number of generics increased from 1 to 2 to 3, respectively. The regression analysis showed that the price ratio in the AP was higher than that in the BP by 0.05, 0.09, and 0.13 for first, second, and third generic entrant respectively. Our findings show that the 70/90 regulations not only failed to achieve their goal of lowering the procurement price but instead the opposite occurred. The mandated procurement price became a focal point and resulted in a clustering of prices around the maximum allowable levels with little price dispersion.
Attitude propulsion technology for TOPS
NASA Technical Reports Server (NTRS)
Moynihan, P. I.
1972-01-01
The thermoelectric outer planet spacecraft (TOPS) attitude propulsion subsystem (APS) effort is discussed. It includes the tradeoff rationale that went into the selection of an anhydrous hydrazine baseline system, followed by a discussion of the 0.22 N thruster and its integration into a portable, self-contained propulsion module that was designed, developed, and man rated to support the TOPS single-axis attitude control tests. The results of a cold-start feasibility demonstration with a modified thruster are presented. A description of three types of 0.44 thrusters that were procured for in-house evaluation is included along with the results of the test program. This is followed by a description of the APS feed system components, their evaluations, and a discussion of an evaluation of elastomeric material for valve seat seals. A list of new technology items which will be of value for application to future systems of this type is included.
Atmospheric Modeling And Sensor Simulation (AMASS) study
NASA Technical Reports Server (NTRS)
Parker, K. G.
1985-01-01
A 4800 band synchronous communications link was established between the Perkin-Elmer (P-E) 3250 Atmospheric Modeling and Sensor Simulation (AMASS) system and the Cyber 205 located at the Goddard Space Flight Center. An extension study of off-the-shelf array processors offering standard interface to the Perkin-Elmer was conducted to determine which would meet computational requirements of the division. A Floating Point Systems AP-120B was borrowed from another Marshall Space Flight Center laboratory for evaluation. It was determined that available array processors did not offer significantly more capabilities than the borrowed unit, although at least three other vendors indicated that standard Perkin-Elmer interfaces would be marketed in the future. Therefore, the recommendation was made to continue to utilize the 120B ad to keep monitoring the AP market. Hardware necessary to support requirements of the ASD as well as to enhance system performance was specified and procured. Filters were implemented on the Harris/McIDAS system including two-dimensional lowpass, gradient, Laplacian, and bicubic interpolation routines.
A second-generation superconducting undulator cryostat for the APS
NASA Astrophysics Data System (ADS)
Fuerst, J.; Hasse, Q.; Ivanyushenkov, Y.; Kasa, M.; Shiroyanagi, Y.
2017-12-01
A second-generation cryocooler-based cryostat has been designed and built to support a new helically wound superconducting undulator (SCU) magnet for the Advanced Photon Source (APS) at Argonne National Laboratory (ANL). The design represents an evolution of existing SCU cryostats currently in operation in the APS storage ring. Value engineering and lessons learned have resulted in a smaller, cheaper, and simpler cryostat design compatible with existing planar magnets as well as the new helically wound device. We describe heat load and quench response results, design and operational details, and the “build-to-spec” procurement strategy.
Information Requirements for a Procurement Management Information System.
1975-08-01
Management Information System is...described and some justification for this type of procurement management information system is presented. A literature search was made to determine...information systems. If information requirements are correctly identified and satisfied by a procurement management information system , contract administration and procurement management can be
DOT National Transportation Integrated Search
2007-09-01
Traditional state procurement processes are not well-suited to the procurement of Intelligent Transportation Systems (ITS). The objective of this study was to analyze Kentuckys existing procurement processes, identify strengths and weaknesses of e...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data... close of the fourth quarter. Specific preparation procedures are contained in the FPDS Reporting Manual...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data... close of the fourth quarter. Specific preparation procedures are contained in the FPDS Reporting Manual...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Small and Disadvantaged Business Utilization (OSDBU) as required by that office. (c) BPCs shall provide... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Small and Disadvantaged Business Utilization (OSDBU) as required by that office. (c) BPCs shall provide... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Small and Disadvantaged Business Utilization (OSDBU) as required by that office. (c) BPCs shall provide... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data...
Feasibility Studies of Optical Processing of Image Bandwidth Compression Schemes.
1984-07-15
c A T I O N s O w N G R A O ’N G SCMEULE distribution unlimited. aP $NEORMN ORGANIZATION REPORT NUMERI(S) S. MONITORING ORGANIZATION REPORT NUMBER(S...AFOSR.Tit. 8 5- 0 17 • OF PERFORMING ORGANIZATION b, OFFICE SYMB’OL 7 NAME OF MONITORING ORGANIZATION The University of Arizona AFOSR/N 4k, ADDRESS...20332-6448 ga. NAME OF PUNDING/SPONSORING Ob. OFFICE SYMBOL 9. PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER ORGANIZATION if appiUcabfle AFOSR NE AFOSR-81
2015-07-01
PAGE Using Government drawings, specifications, or other data included in this document for any purpose other than Government procurement does...not in any way obligate the U.S. Government. The fact that the Government formulated or supplied the drawings, specifications, or other data does...this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data
Potential fraudulent behaviors in e-procurement implementation in Indonesia
NASA Astrophysics Data System (ADS)
Huda, S. N.; Setiani, N.; Pulungan, R.; Winarko, E.
2017-03-01
Corruptions in public procurement have occurred in various parts of the world, especially in developing countries. Implementation of SPSE (electronic procurement system) as the e-procurement system in Indonesia is based on the government’s intentions towards clean and good governance by fighting corruption, collusion, and nepotism. Procurement in Indonesia is carried out through SPSE, which is developed by LKPP (Government Policy on Procurement of Goods/Services). Although this system has brought many positive effects, there are still found many practices of fraud occurring in the implementation of the system. In this paper, we try to identify these practices and then to systematically categorize and analyze them.
48 CFR 702.170-13 - Procurement Executive.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Procurement Executive. 702.170-13 Section 702.170-13 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL DEFINITIONS OF WORDS AND TERMS Definitions 702.170-13 Procurement Executive. “Procurement...
48 CFR 404.602 - Federal Procurement Data System.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Federal Procurement Data System. 404.602 Section 404.602 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL ADMINISTRATIVE MATTERS Contract Reporting 404.602 Federal Procurement Data System. (a) Contracting activities...
Integrated Procurement Management System, Version II
NASA Technical Reports Server (NTRS)
Collier, L. J.
1985-01-01
Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.
48 CFR 752.225-71 - Local procurement.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Local procurement. 752.225... Local procurement. For use in any USAID contract involving performance overseas. Local Procurement (FEB 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods...
48 CFR 752.225-71 - Local procurement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Local procurement. 752.225... Local procurement. For use in any USAID contract involving performance overseas. Local Procurement (FEB 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods...
Transformation of fraud activities in procurement system in Indonesia
NASA Astrophysics Data System (ADS)
Setiani, N.; Huda, S. N.; Pulungan, R.; Winarko, E.
2017-03-01
E-procurement has been applied in Indonesia since 2008 through the adoption of Electronic Procurement System (SPSE). The purpose of the use of SPSE in the procurement process is to improve the efficiency of goods or services procurement. In the bidding process, intensive communication and data exchange between providers and organizers are urgently needed. Through SPSE, the frequency of face to face meetings between providers and the committee can be reduced. This is expected to minimize potential fraud behaviors in the goods or services procurement conducted through the tender process. There exists a transformation of activities in the procurement through SPSE from the tender process that was previously done manually. In this paper, we analyze this transformation between manual procurement process and SPSE-based procurement process. The result of the analysis is exploited for investigating the possibility of fraud behavior transformations in every phase of e-procurement activities.
Applying e-procurement system in the healthcare: the EPOS paradigm
NASA Astrophysics Data System (ADS)
Ketikidis, Panayiotis H.; Kontogeorgis, Apostolos; Stalidis, George; Kaggelides, Kostis
2010-03-01
One of the goals of procurement is to establish a competitive price, while e-procurement utilises electronic commerce to identify potential sources of supply, to purchase goods and services, to exchange contractual information and to interact with suppliers. Extensive academic work has been extensively devoted to e-procurement in diverse industries. However, applying e-procurement in the healthcare sector remains unexplored. It lacks an efficient e-procurement mechanism that will enable hospitals and healthcare suppliers to electronically exchange contractual information, aided by the technologies of optimisation and business rules. The development and deployment of e-procurement requires a major effort in the coordination of complex interorganisational business process. This article presents an e-procurement optimised system (EPOS) for the healthcare marketplace, a complete methodological approach for deploying and operating such system, as piloted in public and private hospitals in three European countries (Greece, Spain and Belgium) and suppliers of healthcare items in the fourth country (Italy). The efficient e-procurement mechanism that EPOS suggests enables hospitals and pharmaceutical and medical equipment suppliers to electronically exchange contractual information.
Chokshi, Maulik; Farooqui, Habib Hasan; Selvaraj, Sakthivel; Kumar, Preeti
2015-01-01
In India, access to medicine in the public sector is significantly affected by the efficiency of the drug procurement system and allied processes and policies. This study was conducted in two socioeconomically different states: Bihar and Tamil Nadu. Both have a pooled procurement system for drugs but follow different models. In Bihar, the volumes of medicines required are pooled at the state level and rate contracted (an open tender process invites bidders to quote for the lowest rate for the list of medicines), while actual invoicing and payment are done at district level. In Tamil Nadu, medicine quantities are also pooled at state level but payments are also processed at state level upon receipt of laboratory quality-assurance reports on the medicines. In this cross-sectional survey, a range of financial and non-financial data related to procurement and distribution of medicine, such as budget documents, annual reports, tender documents, details of orders issued, passbook details and policy and guidelines for procurement were analysed. In addition, a so-called ABC analysis of the procurement data was done to to identify high-value medicines. It was observed that Tamil Nadu had suppliers for 100% of the drugs on their procurement list at the end of the procurement processes in 2006, 2007 and 2008, whereas Bihar's procurement agency was only able to get suppliers for 56%, 59% and 38% of drugs during the same period. Further, it was observed that Bihar's system was fuelling irrational procurement; for example, fluconazole (antifungal) alone was consuming 23.4% of the state's drug budget and was being procured by around 34% of the districts during 2008-2009. Also, the ratios of procurement prices for Bihar compared with Tamil Nadu were in the range of 1.01 to 22.50. For 50% of the analysed drugs, the price ratio was more than 2, that is, Bihar's procurement system was procuring the same medicines at more than twice the prices paid by Tamil Nadu. Centralized, automated pooled procurement models like that of Tamil Nadu are key to achieving the best procurement prices and highest possible access to medicines.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-08
... Procurement of Major Systems of the Department of Defense.'' DATES: Effective Date: September 8, 2010. FOR... 217 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations System. 0... funding or reprogramming for procurement of a major system under a multiyear contract authorized under...
NASA Technical Reports Server (NTRS)
Rao, Gopalakrishna M.; Vaidyanathan, Hari
2007-01-01
This viewgraph presentation reviews the use of the binding procurement process in purchasing Aerospace Flight Battery Systems. NASA Engineering and Safety Center (NESC) requested NASA Aerospace Flight Battery Systems Working Group to develop a set of guideline requirements document for Binding Procurement Contracts.
Tyllinen, Mari; Kaipio, Johanna; Lääveri, Tinja; Nieminen, Marko
2017-01-01
This paper describes the development of a questionnaire for evaluating usability during EHR system procurement (DPUQ). Established usability questionnaires can be used to gather user feedback after using the systems. However, during procurement, experimenting with real system use is practical only with a limited number of system candidates. There is a need for less resource-demanding usability evaluation in the early stages of procurement in cases with several vendors. DPUQ has been designed for usability evaluation by end-users during special scenario-based vendor demonstrations. The questionnaire includes three sets of questions to be used during and after the vendor demonstration. DPUQ delivers specific usability scores and can be used to compare system candidates in procurement complementing other evaluation methods.
Changes in the organ procurement system in South Korea: effects on brain-dead donor numbers.
Lee, S D; Kim, J H
2009-11-01
In Korea, the Organ Transplantation Act came into effect in 2000, establishing the Korean Network for Organ Sharing (KONOS) with centralized authority for organ procurement as well as for approval of donors and recipients to ensure fair organ allocation. However, the number of brain-dead donors decreased sharply, and the organ allocation system proved inefficient. The government revised the Organ Transplantation Act in August 2002, introducing an incentive system. If a transplantation hospital formed a Committee for Brain Death Evaluation and a Hospital Organ Procurement Organization, it could receive a kidney from a brain dead-donor as an incentive to foster organ procurement regardless of the KONOS wait list. The government also launched a pilot brain-dead donor registry program to strengthen Hospital Organ Procurement Organization activity. If local hospitals collaborated with specialized hospitals in organ procurement, local hospitals obtained financial incentives. But because the organ shortage problem has not been resolved, the government has proposed four initiatives: first, broadening the incentive system, which makes it possible to give each specialized hospital a choice of one of eight organs from each donor as an incentive; second, development of an Independent Organ Procurement Organization; third introduction of an opt-out system; and last, improvement of the Committee for Brain Death Evaluation system. It is uncertain which initiatives will be adopted, but changes in organ procurement systems are nonetheless considered a key to solve the organ shortage problem in Korea.
1986-06-01
financial reporting in Republic of Korea Army (ROKA) procurement. A discussion of the nature of the ROKA procurement system and two alternatives to historical cost financial statements are presented. The concepts, methods and procedures of the historical cost/constant dollars financial statements are described. The proposal for current cost/constant dollars financial statements is presented and emphasis is given to the description of four problems in existing ROKA procurement due to using inadequate accounting information. Keywords: Cost accounting, Procurement, Current
DOT National Transportation Integrated Search
2013-04-01
Established in 1995 as the Florida Vehicle : Procurement Program (FVPP), Florida Transit : Research Inspection Procurement Services (TRIPS) : is a vehicle sourcing and procurement system for : Floridas public transit agencies that integrates : ins...
41 CFR 101-26.505-3 - Requests to procure similar items from sources other than GSA supply sources.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Requests to procure... Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26...
PROMIS (Procurement Management Information System)
NASA Technical Reports Server (NTRS)
1987-01-01
The PROcurement Management Information System (PROMIS) provides both detailed and summary level information on all procurement actions performed within NASA's procurement offices at Marshall Space Flight Center (MSFC). It provides not only on-line access, but also schedules procurement actions, monitors their progress, and updates Forecast Award Dates. Except for a few computational routines coded in FORTRAN, the majority of the systems is coded in a high level language called NATURAL. A relational Data Base Management System called ADABAS is utilized. Certain fields, called descriptors, are set up on each file to allow the selection of records based on a specified value or range of values. The use of like descriptors on different files serves as the link between the falls, thus producing a relational data base. Twenty related files are currently being maintained on PROMIS.
Theodorou, Mamas; Georgiou, Marina; Nikolentzos, Athanasios; Bellali, Thalia
2015-04-19
Hospital procurement is a crucial field for any health care system, not only for economic reasons but also for reasons related to the quality and safety of the services provided. That is why the process of procurement is, in most countries, governed by a strict legal framework and policy mechanisms. This study investigates the problems and inefficiencies associated with the procurement of medical devices in public hospitals in Cyprus and formulates empirically documented proposals for improvement. Using the Delphi method, a group of 38 experts approach the procurement system in Cyprus from different angles, achieving high rates of consensus on 35 different statements on the weaknesses and problems of the current medical device procurement system, as well as presenting proposals and recommendations for improvement. The findings are highly valuable for future policy initiatives in Cyprus in the light of the economic crisis and the expected implementation of the new General Health Insurance System (GeSY), which the Government of the Republic of Cyprus and the Troika has agreed.
A Technical Description of the Officer Procurement Model (TOPOPS). Final Report.
ERIC Educational Resources Information Center
Akman, Allan; And Others
The Total Objective Plan for the Officer Procurement System (TOPOPS) is an aggregate-level, computer-based model of the Air Force Officer procurement system developed to operate on the UNIVAC 1108 system. It is designed to simulate officer accession and training and achieve optimal solutions in terms of either cost minimization or accession…
48 CFR 2401.601-70 - Senior Procurement Executive.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Senior Procurement... Authority, and Responsibilities 2401.601-70 Senior Procurement Executive. Unless otherwise designated by the Secretary through a delegation of authority, the Chief Procurement Officer is the Department's Senior...
The PNC-CAT insertion device beamline at the Advanced Photon Source
NASA Astrophysics Data System (ADS)
Heald, S. M.; Stern, E. A.; Brown, F. C.; Kim, K. H.; Barg, B.; Crozier, E. D.
1996-09-01
The PNC-CAT is a consortium of Pacific Northwest institutions formed to instrument a sector (number 20) at the Advanced Photon Source (APS). Research is planned in a variety of areas, with an emphasis on environmentally based problems. The insertion device beamline is based on the APS undulator A and will be optimized for producing microbeams as well as for applications requiring energy scanning capabilities. This paper describes the basic layout and some special features of the beamline. Two experimental stations are planned: one general purpose and one dedicated to MBE and surface science problems. Both tapered capillaries and Kirkpatrick-Baez optics will be used for producing microbeams, and a large optical bench is planned for the main station to allow for easy accommodation of new optics developments. Design calculations and initial capillary tests indicate that flux densities exceeding 1011 photons/sec/mm2 should be achievable. All major components are under construction or in procurement, and initial testing is planned for late 1996.
ERIC Educational Resources Information Center
Briggs, Linda L.
2007-01-01
This article describes the benefits one gets when big schools roll out highly effective eProcurement systems--strategic improvements and savings. eProcurement systems are hot again in higher education, driven by unrelenting cost containment demands, along with industry shifts that have consolidated choices and brought top products to the…
40 CFR 35.6550 - Procurement system standards.
Code of Federal Regulations, 2010 CFR
2010-07-01
...'s procurement system or procurement action under a Cooperative Agreement. (3) Code of conduct. The recipient must comply with the requirements of 40 CFR 31.36(b)(3), which describes standards of conduct for... release must include EPA concurrence. (3) Certification of independent price determination. The recipient...
48 CFR 504.602-71 - Federal Procurement Data System-Public access to data.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Procurement Data System—Public access to data. (a) The FPDS database. The General Services Administration awarded a contract for creation and operation of the Federal Procurement Data System (FPDS) database. That database includes information reported by departments and agencies as required by Federal Acquisition...
48 CFR 504.602-71 - Federal Procurement Data System-Public access to data.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Procurement Data System—Public access to data. (a) The FPDS database. The General Services Administration awarded a contract for creation and operation of the Federal Procurement Data System (FPDS) database. That database includes information reported by departments and agencies as required by Federal Acquisition...
40 CFR 35.936-21 - Delegation to State agencies; certification of procurement systems.
Code of Federal Regulations, 2010 CFR
2010-07-01
...; certification of procurement systems. 35.936-21 Section 35.936-21 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.936-21 Delegation to State agencies; certification of procurement...
41 CFR 101-26.501-5 - Procurement time schedules.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedules. 101-26.501-5 Section 101-26.501-5 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...
Acquisition-Management Program
NASA Technical Reports Server (NTRS)
Avery, Don E.; Vann, A. Vernon; Jones, Richard H.; Rew, William E.
1987-01-01
NASA Acquisition Management Subsystem (AMS) program integrated NASA-wide standard automated-procurement-system program developed in 1985. Designed to provide each NASA installation with procurement data-base concept with on-line terminals for managing, tracking, reporting, and controlling contractual actions and associated procurement data. Subsystem provides control, status, and reporting for various procurement areas. Purpose of standardization is to decrease costs of procurement and operation of automatic data processing; increases procurement productivity; furnishes accurate, on-line management information and improves customer support. Written in the ADABAS NATURAL.
41 CFR 101-26.507-2 - Procurement time schedule.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedule. 101-26.507-2 Section 101-26.507-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...
48 CFR 2406.304-70 - Approval of the justification-field procurements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Other Than Full and Open Competition 2406.304-70 Approval of the justification—field procurements. (a) The justification for other than full and open competition for field procurements shall be approved in... justification-field procurements. 2406.304-70 Section 2406.304-70 Federal Acquisition Regulations System...
NASA Astrophysics Data System (ADS)
Ninomiya, Hitoshi; Nanerikawa, Susumu
Public procurement system such as Overall-Evaluation dynamically has been changed on local public works in Japan. However some characteristics of Bidding-Strategy and procurement system have not enough clarified. This paper attempt to analysis for a syatem dynamics and mechanisum of Overall-Evaluation by developing new simulation model focused on Bidding-Strategy, to propose some improvement scenario.
Lives and choices, give and take: Altruism and organ procurement.
Thornton, Vicky
2017-01-01
In 2015, Wales introduced a deemed consent: soft opt-out system for organ procurement in order to address the chronic shortage of organs for transplant. Early statistical evidence suggests that this has had a positive impact on cadaveric organ donation. Such a system for procurement has previously been dismissed by the Organ Donation Taskforce, who suggested that opting out could potentially undermine the concept of donated organs as gifts and this could then negatively impact the number of organs offered for transplant. Considerable weight was placed upon the need to retain the altruistic gift element associated with an opt-in system. This article will consider the role of altruism in an organ procurement policy. A broad utilitarian approach will be taken when putting forward the arguments in favour of adopting a weak altruism position in a soft opt-out system for procurement with a combined registry.
Report on the Audit of the Procurement of the Combined Arms Training-Integrated Evaluation System
1990-05-23
This is our final report on the Audit of the Procurement of the Combined Arms Training-Integrated Evaluation System (CATIES). We made the audit from...January through September 1989 in response to a Hotline complaint alleging irregularities in the procurement of CATIES. The audit objectives were to
48 CFR 504.605-70 - Federal Procurement Data System-Public access to data.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Procurement Data System—Public access to data. (a) The FPDS database. The General Services Administration awarded a contract for creation and operation of the Federal Procurement Data System (FPDS) database. That database includes information reported by departments and agencies as required by FAR subpart 4.6. One of...
48 CFR 504.605-70 - Federal Procurement Data System-Public access to data.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Procurement Data System—Public access to data. (a) The FPDS database. The General Services Administration awarded a contract for creation and operation of the Federal Procurement Data System (FPDS) database. That database includes information reported by departments and agencies as required by FAR subpart 4.6. One of...
48 CFR 504.605-70 - Federal Procurement Data System-Public access to data.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Procurement Data System—Public access to data. (a) The FPDS database. The General Services Administration awarded a contract for creation and operation of the Federal Procurement Data System (FPDS) database. That database includes information reported by departments and agencies as required by FAR subpart 4.6. One of...
17 CFR 256.01-4 - Construction or service contracts, and centralized procurement accounting.
Code of Federal Regulations, 2010 CFR
2010-04-01
... expenses directly attributable to construction work shall be excluded from the accounting system of the... companies. Cost of goods procured shall be excluded from the accounting system of the service company and... contracts, and centralized procurement accounting. 256.01-4 Section 256.01-4 Commodity and Securities...
Theodorou, Mamas; Georgiou, Marina; Nikolentzos, Athanasios; Bellali, Thalia
2015-01-01
Hospital procurement is a crucial field for any health care system, not only for economic reasons but also for reasons related to the quality and safety of the services provided. That is why the process of procurement is, in most countries, governed by a strict legal framework and policy mechanisms. This study investigates the problems and inefficiencies associated with the procurement of medical devices in public hospitals in Cyprus and formulates empirically documented proposals for improvement. Using the Delphi method, a group of 38 experts approach the procurement system in Cyprus from different angles, achieving high rates of consensus on 35 different statements on the weaknesses and problems of the current medical device procurement system, as well as presenting proposals and recommendations for improvement. The findings are highly valuable for future policy initiatives in Cyprus in the light of the economic crisis and the expected implementation of the new General Health Insurance System (GeSY), which the Government of the Republic of Cyprus and the Troika has agreed. PMID:26153175
Optimizing national immunization program supply chain management in Thailand: an economic analysis.
Riewpaiboon, A; Sooksriwong, C; Chaiyakunapruk, N; Tharmaphornpilas, P; Techathawat, S; Rookkapan, K; Rasdjarmrearnsook, A; Suraratdecha, C
2015-07-01
This study aimed to conduct an economic analysis of the transition of the conventional vaccine supply and logistics systems to the vendor managed inventory (VMI) system in Thailand. Cost analysis of health care program. An ingredients based approach was used to design the survey and collect data for an economic analysis of the immunization supply and logistics systems covering procurement, storage and distribution of vaccines from the central level to the lowest level of vaccine administration facility. Costs were presented in 2010 US dollar. The total cost of the vaccination program including cost of vaccine procured and logistics under the conventional system was US$0.60 per packed volume procured (cm(3)) and US$1.35 per dose procured compared to US$0.66 per packed volume procured (cm(3)) and US$1.43 per dose procured under the VMI system. However, the findings revealed that the transition to the VMI system and outsourcing of the supply chain system reduced the cost of immunization program at US$6.6 million per year because of reduction of un-opened vaccine wastage. The findings demonstrated that the new supply chain system would result in efficiency improvement and potential savings to the immunization program compared to the conventional system. Copyright © 2015 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.
de Bucourt, Maximilian; Busse, Reinhard; Güttler, Felix; Wintzer, Christian; Collettini, Federico; Kloeters, Christian; Hamm, Bernd; Teichgräber, Ulf K
2011-08-01
OBJECTIVES: To apply the economic terminology of lean manufacturing and the Toyota Production System to the procurement of vascular stents in interventional radiology. METHODS: The economic- and process-driven terminology of lean manufacturing and the Toyota Production System is first presented, including information and product flow as well as value stream mapping (VSM), and then applied to an interdisciplinary setting of physicians, nurses and technicians from different medical departments to identify wastes in the process of endovascular stent procurement in interventional radiology. RESULTS: Using the so-called seven wastes approach of the Toyota Production System (waste of overproducing, waiting, transport, processing, inventory, motion and waste of defects and spoilage) as well as further waste characteristics (gross waste, process and method waste, and micro waste), wastes in the process of endovascular stent procurement in interventional radiology were identified and eliminated to create an overall smoother process from the procurement as well as from the medical perspective. CONCLUSION: Economic terminology of lean manufacturing and the Toyota Production System, especially VSM, can be used to visualise and better understand processes in the procurement of vascular stents in interventional radiology from an economic point of view.
41 CFR 101-26.501-3 - Consolidated purchase program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT..., purchased in the aggregate by group to the extent practical. These procurements are designed to obtain the...
Feltham, R K
1995-01-01
Open tendering for medical informatics systems in the UK has traditionally been lengthy and, therefore, expensive on resources for vendor and purchaser alike. Events in the United Kingdom (UK) and European Community (EC) have led to new Government guidance being published on procuring information systems for the public sector: Procurement of Information Systems Effectively (POISE). This innovative procurement process, launched in 1993, has the support of the Computing Services Association (CSA) and the Federation of the Electronics Industry (FEI). This paper gives an overview of these new UK guidelines on healthcare information system purchasing in the context of a recent procurement project with an NHS Trust Hospital. The aim of the project was to replace three aging, separate, and different laboratory computer systems with a new, integrated turnkey system offering all department modules, an Open modern computer environment, and on-line electronic links to key departmental systems, both within and external to the Trust by the end of 1994. The new system had to complement the Trust's strategy for providing a modern clinical laboratory service to the local population and meet a tight budget.
1985-09-01
courses for a concentration in procurement and materials management: Procurement and Materials Management Procurement Contract Law Systems Procurement...for contracting in the public sector (Procurement Contract Law ). The respondents did not agree as much with this question as they did with the...the results of this section proved quite different from the group as a whole. Contract Law , Contract Negotiations, Pricing, Procurement Management
Procurement of prescriber support systems.
Kajbjer, Karin
2008-01-01
Supporting the process of medication selection and electronic management of prescriptions is a high priority issue in the eHealth strategies of many countries today. Procuring such systems can be quite difficult, especially if one should encourage suppliers from different countries to participate. The new ISO Technical Report 22,790 provides a new approach to facilitate this process by giving an international basis for specifying the functional characteristics desired. The paper describes the content of the report and discusses the procurement process in the light of the European public procurement directive and patient safety.
Industrial application experiment series
NASA Technical Reports Server (NTRS)
Bluhm, S. A.
1981-01-01
Two procurements within the Industrial Application Experiment Series of the Thermal Power Systems Project are discussed. The first procurement, initiated in April 1980, resulted in an award to the Applied Concepts Corporation for the Capital Concrete Experiment: two Fresnel concentrating collectors will be evaluated in single-unit installations at the Jet Propulsion Laboratory Parabolic Dish Test Site and at Capitol Concrete Products, Topeka, Kansas. The second procurement, initiated in March 1981, is titled, "Thermal System Engineering Experiment B." The objective of the procurement is the rapid deployment of developed parabolic dish collectors.
Optimal Black Start Resource Allocation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Qiu, Feng; Wang, Jianhui; Chen, Chen
The restoration of the bulk power system after a partial or complete blackout relies on black-start (BS) resources. To prepare for system restoration, it is important to procure the right amount of BS resources at the right locations in the grid so that the total restoration time can be minimized. Achieving this goal requires that resource procurement planning takes the restoration process into account. In this study, we integrate the BS resource procurement decision with a restoration planning model and develop an optimization model that produces a minimal cost procurement plan that satisfies the restoration time requirement.
Caremans, Jeroen; Hamans, Evert; Muylle, Ludo; Van de Heyning, Paul; Van Rompaey, Vincent
2016-06-01
Allograft tympano-ossicular systems (ATOS) have proven their use over many decades in tympanoplasty and reconstruction after resection of cholesteatoma. The transcranial bone plug technique has been used in the past 50 years to procure en bloc ATOS (tympanic membrane with malleus, incus and stapes attached). Recently, our group reported the feasibility of the endoscopic procurement technique. The aim of this study was to assess whether clinical outcome is equivalent in ATOS acquired by using the endoscopic procurement technique compared to ATOS acquired by using the transcranial technique. A double-blind randomized controlled audit was performed in a tertiary referral center in patients that underwent allograft tympanoplasty because of chronic otitis media with and without cholesteatoma. Allograft epithelialisation was evaluated at the short-term postoperative visit by microscopic examination. Failures were reported if reperforation was observed. Fifty patients underwent allograft tympanoplasty: 34 received endoscopically procured ATOS and 16 received transcranially procured ATOS. One failed case was observed, in the endoscopic procurement group. We did not observe a statistically significant difference between the two groups in failure rate. This study demonstrates equivalence of the clinical outcome of allograft tympanoplasty using either endoscopic or transcranial procured ATOS and therefore indicates that the endoscopic technique can be considered the new standard procurement technique. Especially because the endoscopic procurement technique has several advantages compared to the former transcranial procurement technique: it avoids risk of prion transmission and it is faster while lacking any noticeable incision.
Lingg, Myriam; Wyss, Kaspar; Durán-Arenas, Luis
2016-07-08
In organisational theory there is an assumption that knowledge is used effectively in healthcare systems that perform well. Actors in healthcare systems focus on managing knowledge of clinical processes like, for example, clinical decision-making to improve patient care. We know little about connecting that knowledge to administrative processes like high-risk medical device procurement. We analysed knowledge-related factors that influence procurement and clinical procedures for orthopaedic medical devices in Mexico. We based our qualitative study on 48 semi-structured interviews with various stakeholders in Mexico: orthopaedic specialists, government officials, and social security system managers or administrators. We took a knowledge-management related perspective (i) to analyse factors of managing knowledge of clinical procedures, (ii) to assess the role of this knowledge and in relation to procurement of orthopaedic medical devices, and (iii) to determine how to improve the situation. The results of this study are primarily relevant for Mexico but may also give impulsion to other health systems with highly standardized procurement practices. We found that knowledge of clinical procedures in orthopaedics is generated inconsistently and not always efficiently managed. Its support for procuring orthopaedic medical devices is insufficient. Identified deficiencies: leaders who lack guidance and direction and thus use knowledge poorly; failure to share knowledge; insufficiently defined formal structures and processes for collecting information and making it available to actors of health system; lack of strategies to benefit from synergies created by information and knowledge exchange. Many factors are related directly or indirectly to technological aspects, which are insufficiently developed. The content of this manuscript is novel as it analyses knowledge-related factors that influence procurement of orthopaedic medical devices in Mexico. Based on our results we recommend that the procurement mechanism should integrate knowledge from clinical procedures adequately in their decision-making. Without strong guidance, organisational changes, and support by technological solutions to improve the generation and management of knowledge, procurement processes for orthopaedic high-risk medical devices will remain sub-optimal.
NASA Astrophysics Data System (ADS)
Candra, S.; E Gunawan, F.
2017-01-01
In digital economy, government of Indonesia uses the internet to deliver services and to communicate with citizens and organizations. One of applications are e-Procurement and LPSE is a unit to hold the service system of e-Procurement. Procurement of goods and services electronically in addition will increase transparency and accountability, improve market access and healthy competition, as well as improving the efficiency of the procurement process. Based on the background and specific objectives to be achieved, then the research will be viewed from e-Marketplace participation, Trust and its impact on the performance of existing procurement within the institution. Methods of data analysis used in this research is by using analysis of Structural Equation Modelling (SEM) by using the program Partial Least Square (PLS) to examine the relationship between variables. The population used in this study is an enterprise as well as other clients using the system LPSE Bekasi District. There are three part in this study population, namely the provision of a company, customer, and supplier of LPSE users amounted to 60 users. From data analysis, there are one hypothesis that rejected. The implication of this study are implementation of e-procurement and e-marketplace participation giving impact to procurement performance.
The organization of organ procurement.
Prottas, J M
1989-01-01
The American organ procurement system has improved and matured in the last five years. At the same time, the basic challenges facing it have remained substantially the same because the moral and legal framework of the system has not changed. Success at organ procurement continues to depend on the voluntary cooperation of medical professionals and the families of potential organ donors. The generosity of the American public is so great that the primary challenge facing organ procurement agencies is obtaining cooperation from hospitals and medical professionals. This calls for a "marketing" orientation aimed at those hospitals and professionals who are most likely to treat potential donors. The last five years have seen a more general acceptance of this appreciation of the central task of organ procurement. As a result, the overall effectiveness of the system has improved, as measured by the number of organs procured on a per capita basis and by the number of multiorgan donors obtained. Much of this improvement can be attributed to the diffusion of organizational techniques and approaches, and this diffusion has been encouraged by the involvement of national organizations and public bodies in the organ procurement community. The system remains uneven in its effectiveness and further improvement is possible. It is also possible that the next general round of improvement will result from the application of businesslike information management and marketing techniques.
The model and moral justification for organ procurement in Japan.
Bagheri, Alireza; Shoji, Shin'ichi
2005-01-01
Organ replacement therapy is a part of medical practice in today's world and many countries have adopted the required guidelines and regulations. Establishing the basis on which organs can be removed, is still one of the most controversial issues of health policy making in the debate. The critical disparity between supply and demand in organ replacement therapy, even with the existence of social acceptance and organ transplantation law, turns attention towards the importance of an appropriate model of organ procurement. This model should be able to expand the donor pool and increase the organ retrieval rate by converting potential donors to actual ones. In Japan the organ transplantation law which was enacted in 1997 allows organ procurement from brain death as well as non-heart beating cadavers according to restricted conditions. One such condition includes the necessity of both the donor's and the family's written consent. Under current organ procurement policy, organs from only 29 brain death cases have been so far procured. In this paper after examining the current organ procurement system in Japan and the moral justifications behind different organ procurement models we conclude that the Japanese system does not clearly fall into one of the popular organ procurement models.
DOE Office of Scientific and Technical Information (OSTI.GOV)
RIECK, C.A.
1999-02-25
The primary purpose of the Initial Tank Retrieval Systems (ITRS) is to provide systems for retrieval of radioactive wastes stored in underground double-shell tanks (DSTS) for transfer to alternate storage, evaporation, pretreatment or treatment, while concurrently reducing risks associated with safety watch list and other DSTs. This Description of Operations (DOO) defines the control philosophy for the waste retrieval system for tanks 241-AP-102 (AP-102) and 241-AP-104 (AP-104). This DOO will provide a basis for the detailed design of the Retrieval Control System (RCS) for AP-102 and AP-104 and establishes test criteria for the RCS. The test criteria will be usedmore » during qualification testing and acceptance testing to verify operability.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-15
... DEPARTMENT OF AGRICULTURE Forest Service Information Collection; Virtual Incident Procurement... from all interested individuals and organizations on the new information collection, Virtual Incident....t., Monday through Friday. SUPPLEMENTARY INFORMATION: Title: Virtual Incident Procurement (VIPR...
AP@home: a novel European approach to bring the artificial pancreas home.
Heinemann, Lutz; Benesch, Carsten; DeVries, J Hans
2011-11-01
The development of an artificial pancreas (AP) made huge strides from 2006 to 2008 and a large number of activities are going on in this area of research. Until now, most AP systems under development were tested only under highly controlled conditions. The aim of our project, funded by the European Union, is to develop an AP system to such a level that it can be studied under daily life conditions at the home of patients with diabetes (hence AP@home). Based on a subcutaneous-subcutaneous closed-loop strategy (i.e., glucose sensing and insulin infusion in the subcutaneous tissue), two different approaches will be taken to achieve this aim: a two-port AP system and a single-port AP system. The two-port AP system will use off-the-shelf-components for the glucose sensor and insulin pump in combination with closed-loop algorithms generated in Europe. As to the single-port AP system, two different innovative single-port systems will be developed; in this case, continuous glucose monitoring and insulin infusion will take place via a single catheter. The first clinical trials with the two-port AP system under controlled clinical conditions have started and good progress has been made in the development of the single-port AP systems. We believe that our consortium of 12 European partners, which builds on existing achievements and close cooperation between academic centers and industry, can contribute substantially to the development of an AP system that can be used by patients in daily life. © 2011 Diabetes Technology Society.
A Framework for Usability Evaluation in EHR Procurement.
Tyllinen, Mari; Kaipio, Johanna; Lääveri, Tinja
2018-01-01
Usability should be considered already by the procuring organizations when selecting future systems. In this paper, we present a framework for usability evaluation during electronic health record (EHR) system procurement. We describe the objectives of the evaluation, the procedure, selected usability attributes and the evaluation methods to measure them. We also present the emphasis usability had in the selection process. We do not elaborate on the details of the results, the application of methods or gathering of data. Instead we focus on the components of the framework to inform and give an example to other similar procurement projects.
25 CFR 900.49 - What procurement standards apply to subcontracts?
Code of Federal Regulations, 2012 CFR
2012-04-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...
25 CFR 900.49 - What procurement standards apply to subcontracts?
Code of Federal Regulations, 2010 CFR
2010-04-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...
25 CFR 900.49 - What procurement standards apply to subcontracts?
Code of Federal Regulations, 2014 CFR
2014-04-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...
25 CFR 900.49 - What procurement standards apply to subcontracts?
Code of Federal Regulations, 2013 CFR
2013-04-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...
25 CFR 900.49 - What procurement standards apply to subcontracts?
Code of Federal Regulations, 2011 CFR
2011-04-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...
41 CFR 101-26.501-2 - Standardized buying programs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.501-2 Standardized buying programs. Wherever... school age passenger. (4) Sedans and station wagons (based on standardized, consolidated requirements...
An Analysis of Bid Evaluation Procedures of Contemporary Models for Procurement in Pakistan
2016-12-01
21 E. COMPONENTS FOR BID EVALUATION .........................................21 1. Market Intelligence...PROCUREMENT SYSTEM ...............................................23 1. Basic Principles ...43 1. Principles of Procurement and Prequalification .......................43 2. Contract Types
76 FR 13297 - Defense Federal Acquisition Regulation Supplement; Technical Amendments
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-11
... 215 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations System... Director, Defense Procurement and Acquisition Policy. DATES: Effective Date: March 11, 2011. Applicability... adding a section at 215.300 with a reference to Director, Defense Procurement and Acquisition Policy...
41 CFR 101-26.301 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Section 101-26.301 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.301 Applicability. All executive agencies within the United States...
Innovating the Standard Procurement System Utilizing Intelligent Agent Technologies
1999-12-01
36 C. STANDARD PROCUREMENT SYSTEM 36 1. OVERVIEW 36 2. SPS FUNCTIONS , 37 3. SPS ADVANTAGES 39 4. SPS DISADVANTAGES 40 5. SPS SUMMARY 41 D...PROCUREMENT PROCESS INNOVATION RESULTS ’. 52 E. INTELLIGENT AGENT (IA) TECHNOLOGY 53 1. OVERVIEW 54 viii 2. ADVANTAGES 58 3. DISADVANTAGES 58 F...Electronic Mall (EMALL), GSA Advantage , etc. • Web invoicing Electronic Funds Transfer (EFT) • • International Merchant Purchase Authorization Card (IMPAC
Energy Systems Integration Newsletter | Energy Systems Integration Facility
simulated sequences based on a model network. The competitive procurement process provided comparative , procurement help, design reviews, and now construction support. Miramar project support is part of integrated
48 CFR 725.705 - Local procurement-contract clause.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Local procurement-contract... DEVELOPMENT SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.705 Local procurement—contract clause. Local procurement may be undertaken in accordance with the provisions of 22 CFR...
48 CFR 725.705 - Local procurement-contract clause.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Local procurement-contract... DEVELOPMENT SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.705 Local procurement—contract clause. Local procurement may be undertaken in accordance with the provisions of 22 CFR...
5 CFR 300.506 - Requirements of procurement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... must follow the Federal procurement laws and the Federal Acquisition Regulation, as applicable, in... Federal procurement system to make clear that the firm is the legally responsible employer and to specify... the types and levels of skills to be provided, deadlines for providing service, liability insurance...
Willging, Cathleen E; Aarons, Gregory A; Trott, Elise M; Green, Amy E; Finn, Natalie; Ehrhart, Mark G; Hecht, Debra B
2016-09-01
Sustainment of evidence-based interventions (EBIs) in human services depends on the inner context of community-based organizations (CBOs) that provide services and the outer context of their broader environment. Increasingly, public officials are experimenting with contracting models from for-profit industries to procure human services. In this case study, we conducted qualitative interviews with key government and CBO stakeholders to examine implementation of the Best Value-Performance Information Procurement System to contract for EBIs in a child welfare system. Findings suggest that stakeholder relationships may be compromised when procurement disregards local knowledge, communication, collaboration, and other factors supporting EBIs and public health initiatives.
41 CFR 101-30.000 - Scope of part.
Code of Federal Regulations, 2013 CFR
2013-07-01
... items of supply, a prerequisite for integrated item management under the Federal procurement system... Section 101-30.000 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM § 101-30.000...
System modeling of the Thirty Meter Telescope alignment and phasing system
NASA Astrophysics Data System (ADS)
Dekens, Frank G.; Seo, Byoung-Joon; Troy, Mitchell
2014-08-01
We have developed a system model using the System Modeling Language (SysML) for the Alignment and Phasing System (APS) on the Thirty Meter Telescope (TMT). APS is a Shack-Hartmann wave-front sensor that will be used to measure the alignment and phasing of the primary mirror segments, and the alignment of the secondary and tertiary mirrors. The APS system model contains the ow-down of the Level 1 TMT requirements to APS (Level 2) requirements, and from there to the APS sub-systems (Level 3) requirements. The model also contains the operating modes and scenarios for various activities, such as maintenance alignment, post-segment exchange alignment, and calibration activities. The requirements ow-down is captured in SysML requirements diagrams, and we describe the process of maintaining the DOORS database as the single-source-of-truth for requirements, while using the SysML model to capture the logic and notes associated with the ow-down. We also use the system model to capture any needed communications from APS to other TMT systems, and between the APS sub-systems. The operations are modeled using SysML activity diagrams, and will be used to specify the APS interface documents. The modeling tool can simulate the top level activities to produce sequence diagrams, which contain all the communications between the system and subsystem needed for that activity. By adding time estimates for the lowest level APS activities, a robust estimate for the total time on-sky that APS requires to align and phase the telescope can be obtained. This estimate will be used to verify that the time APS requires on-sky meets the Level 1 TMT requirements.
Wafula, Francis; Agweyu, Ambrose; Macintyre, Kate
2014-04-01
Nearly 40% of Global Fund money goes toward procurement. However, no analyses have been published to show how costs vary across regions and time, despite the availability of procurement data collected through the Global Fund's price and quality reporting system. We analyzed data for the 3 most widely procured commodities for the prevention, diagnosis, and treatment of HIV. These were male condoms, HIV rapid tests, and the antiretroviral (ARV) combination of lamivudine/nevirapine/zidovudine. The compared costs, first across time (2005-2012), then across regions, and finally, between individual procurement reported through the price and quality reporting and pooled procurement reported through the Global Fund's voluntary pooled procurement system. All costs were adjusted for inflation and reported in US dollars. There were 2337 entries from 578 grants in 125 countries. The procurement cost for the ARV dropped substantially over the period, whereas those for condoms and HIV tests remained relatively stable. None of the commodity prices increased. Regional variations were pronounced for HIV tests, but minimal for condoms and the ARV. The unit cost for the 3-table ARV combination, for instance, varied between US$0.15 and US$0.23 in South Asia and the Eastern Europe/Central Asia regions, respectively, compared with a range of $0.23 (South Asia)-$1.50 (Eastern Europe/Central Asia) for a single diagnostic test. Pooled procurement lowered costs for condoms but not the other commodities. We showed how global procurement costs vary by region and time. Such analyses should be done more often to identify and correct market insufficiencies.
NASA Technical Reports Server (NTRS)
Witkin, S. A.
1976-01-01
Guidelines are presented for a quality assurance system to be implemented by the manufacturer in support of designing, developing, fabricating, assembling, inspecting, testing, handling, and delivery of equipment being procured for use in public urban mass transit systems. The guidelines apply to this equipment when being procured for: (1) use in revenue service; (2) demonstration of systems that will be revenue producing or used by the public; (3) use as a prototype for follow-on operational/revenue producing equipment procurements; and (4) qualification tests.
Assignment Procedures in the Air Force Procurement Management Information System.
ERIC Educational Resources Information Center
Ward, Joe H., Jr.; And Others
An overview is presented of the procedure for offering jobs in the Air Force Procurement Management Information System (PROMIS), an assignment system which makes possible the use of human resources research findings to improve individual personnel assignments. A general framework for viewing personnel assignment systems is presented; then job…
48 CFR 908.7107 - Procurement and use of industrial alcohol.
Code of Federal Regulations, 2011 CFR
2011-10-01
... industrial alcohol. 908.7107 Section 908.7107 Federal Acquisition Regulations System DEPARTMENT OF ENERGY....7107 Procurement and use of industrial alcohol. (a) This section covers the procurement of industrial alcohol by DOE or authorized contractors and the applicable policies and delegations of authority to...
41 CFR 101-26.302 - Standard and optional forms.
Code of Federal Regulations, 2013 CFR
2013-07-01
... forms. 101-26.302 Section 101-26.302 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.302 Standard and optional forms. Agencies...
41 CFR 101-26.301-1 - Similar items.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-1 Section 101-26.301-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.301-1 Similar items. (a) Agencies required to...
41 CFR 101-26.301-1 - Similar items.
Code of Federal Regulations, 2012 CFR
2012-07-01
....301-1 Section 101-26.301-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.301-1 Similar items. (a) Agencies required to...
41 CFR 101-26.301-1 - Similar items.
Code of Federal Regulations, 2011 CFR
2011-07-01
...-1 Section 101-26.301-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.301-1 Similar items. (a) Agencies required to...
41 CFR 101-26.302 - Standard and optional forms.
Code of Federal Regulations, 2011 CFR
2011-07-01
... forms. 101-26.302 Section 101-26.302 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.302 Standard and optional forms. Agencies...
41 CFR 101-26.301-1 - Similar items.
Code of Federal Regulations, 2014 CFR
2014-07-01
...-1 Section 101-26.301-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.301-1 Similar items. (a) Agencies required to...
41 CFR 101-26.301-1 - Similar items.
Code of Federal Regulations, 2013 CFR
2013-07-01
...-1 Section 101-26.301-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.301-1 Similar items. (a) Agencies required to...
41 CFR 101-26.302 - Standard and optional forms.
Code of Federal Regulations, 2012 CFR
2012-07-01
... forms. 101-26.302 Section 101-26.302 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.302 Standard and optional forms. Agencies...
41 CFR 101-26.302 - Standard and optional forms.
Code of Federal Regulations, 2010 CFR
2010-07-01
... forms. 101-26.302 Section 101-26.302 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.302 Standard and optional forms. Agencies...
41 CFR 101-26.302 - Standard and optional forms.
Code of Federal Regulations, 2014 CFR
2014-07-01
... forms. 101-26.302 Section 101-26.302 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items § 101-26.302 Standard and optional forms. Agencies...
76 FR 4113 - Federal Procurement Data System Product Service Code Manual Update
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-24
... reported in the Federal Procurement Data System (FPDS). GSA, which maintains the PSC Manual, is in the... codes as necessary, and adding environmental/sustainability attributes required for reporting to the...
Lingg, Myriam; Wyss, Kaspar; Durán-Arenas, Luis
2016-08-08
We know little about how procurement of a high-risk medical device (HRMD) affects clinical practice and outcomes. In health systems in high-income countries, and specifically those that maintain a national arthroplasty registry, procurement decisions are frequently guided by long-term clinical results, with the goal of ensuring at least standard quality of HRMDs. But in countries like Mexico, decision-making is often dominated by lowest acquisition price. We set out to study the impact of procurement for orthopaedic HRMDs on clinical procedures and outcomes. We based our qualitative study on 59 in-depth interviews with stakeholders from Mexico, Switzerland, Germany, and UK: orthopaedic specialists, government officials, other experts, and social security system managers or administrators. We took a healthcare delivery approach to capturing and comparing factors that affected the regulations of HRMDs and procurement processes, and to understanding connections between procurement and clinical practice. Our findings demonstrate for procurement processes that the three European countries compared to Mexico don't have similar concerns with regards to their procurement processes. Deficiencies of procurement regulations and practices identified from representatives in Mexico were almost absent in European countries. We identified three areas of deficiency: 1) HRMD regulations based on insufficiently robust clinical evidence (mainly noted by European countries); 2) Follow-up on Health Technology Assessments is inadequate (noted by Mexico) and methodology not always good enough (noted by European countries); and, 3) Lowest-acquisition price often guides procurement decisions and thus may not align with needs of clinical procedures (noted by Mexico and some European countries). Procurement processes for orthopaedic HRMDs may have an impact on clinical procedures and outcomes. A favourable approach is one where orthopaedic specialists are parties to the procurement process, and post-market surveillance data informs decision-making. Actors in the procurement process can improve their impact on clinical procedures and outcomes by developing specific strategies that better align the needs of both, procurement and clinical procedures.
Army and Marine Corps Active Protection System (APS) Efforts
2016-08-30
efforts—the Expedited, Non-Developmental Item (NDI) APS effort and the Modular Active Protection System (MAPS) effort. The Marines describe their...17 Modular Active Protection System (MAPS) Effort .......................................................... 18 The Marine Corps APS...Merkava Mark 4 tank was designed around the Trophy APS. 32 The Army’s Modular Active Protection System (MAPS) effort, described below, is intended to
Medical technology procurement in Europe: a cross-country comparison of current practice and policy.
Sorenson, Corinna; Kanavos, Panos
2011-04-01
Procurement policy can influence the diffusion of medical devices into national health systems, but limited comparative evidence exists on how countries procure such technologies. This paper discusses the procurement of select medical devices across five countries (England, France, Germany, Italy, and Spain) based on a review of published and grey literature and policy documents, as well as expert interviews. All countries have introduced various regulatory or policy measures that implicitly or explicitly influence device procurement, from lists of devices for purchase to changes in financing mechanisms. There has also been movement toward more centralized procurement with the introduction of purchasing groups or consortiums, notably in England, France, Germany, and Italy. While a number of stakeholder groups are involved in purchasing activities, a greater, more formalized role for physicians and governments is needed to ensure that technologies procured best meet patient needs and align with national health care priorities and other sectoral objectives. A general theme across all national procurement systems was a focus on cost-containment, but like other areas of technology policy (e.g., coverage), basing purchasing decisions on a broader range of criteria, such as quality and health outcomes, might better allow governments to achieve value for money and support patient access to beneficial innovations. More research is needed, however, to substantiate the role and influence of procurement on balancing the adoption and affordability of medical technologies. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.
41 CFR 101-30.101-5 - Cataloging.
Code of Federal Regulations, 2014 CFR
2014-07-01
... System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.1..., classifying, numbering, and publishing in the Federal Catalog System all items of personal property (items of supply) repetitively procured, stored, issued, and/or used by Federal agencies. [41 FR 11308, Mar. 18...
41 CFR 101-30.101-5 - Cataloging.
Code of Federal Regulations, 2012 CFR
2012-07-01
... System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.1..., classifying, numbering, and publishing in the Federal Catalog System all items of personal property (items of supply) repetitively procured, stored, issued, and/or used by Federal agencies. [41 FR 11308, Mar. 18...
41 CFR 101-30.101-5 - Cataloging.
Code of Federal Regulations, 2011 CFR
2011-07-01
... System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.1..., classifying, numbering, and publishing in the Federal Catalog System all items of personal property (items of supply) repetitively procured, stored, issued, and/or used by Federal agencies. [41 FR 11308, Mar. 18...
41 CFR 101-30.101-5 - Cataloging.
Code of Federal Regulations, 2010 CFR
2010-07-01
... System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.1..., classifying, numbering, and publishing in the Federal Catalog System all items of personal property (items of supply) repetitively procured, stored, issued, and/or used by Federal agencies. [41 FR 11308, Mar. 18...
41 CFR 101-30.101-5 - Cataloging.
Code of Federal Regulations, 2013 CFR
2013-07-01
... System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.1..., classifying, numbering, and publishing in the Federal Catalog System all items of personal property (items of supply) repetitively procured, stored, issued, and/or used by Federal agencies. [41 FR 11308, Mar. 18...
DOT National Transportation Integrated Search
2000-03-01
Procurement of Intelligent Transportation System (ITS) projects using Federal-aid funds can present challenges that are not typically observed in traditional transportation projects. Many roadway improvement projects involve the two-step "Design-Bid-...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Requisitioning data...
ITS procurement : analysis and recommendations.
DOT National Transportation Integrated Search
1994-01-01
Virginia has met with a variety of difficulties and delays in its procurement of intelligent transportation systems, components, and studies. The Fastoll Automatic Toll System was initiated in 1987, and construction has still not begun. It has been t...
Drug procurement and management.
Salhotra, V S
2003-03-01
A strong drug procurement and management system under the RNTCP is critical to programme success. Significant improvements in manufacturing, inspection, supply, storage and quality control practices and procedures have been achieved due to an intensive RNTCP network. Drugs used in RNTCP are rifampicin, isoniazid, ethambutol, pyrazinamide and streptomycin. Patients of TB are categorised into I, II and III and each category has a different standarised treatment. Procurement, distribution system and quality assurance of drugs are narrated in brief in this article.
1987-06-01
of Defense sells military equipment and services to foreign governments and international organizations. DOD may order and buy ( procure ) the... procurement , the U.S. government agency or military department assigned cognizance for this "case" is authorized to enter into a subsequent contractional...the item but are handled in the same way as regular U.S. government procurement , with program directors and systems managers as needed dealing with the
Procurement performance measurement system in the health care industry.
Kumar, Arun; Ozdamar, Linet; Ng, Chai Peng
2005-01-01
The rising operating cost of providing healthcare is of concern to health care providers. As such, measurement of procurement performance will enable competitive advantage and provide a framework for continuous improvement. The objective of this paper is to develop a procurement performance measurement system. The paper reviews the existing literature in procurement performance measurement to identify the key areas of purchasing performance. By studying the three components in the supply chain collectively with the resources, procedures and output, a model is been developed. Additionally, a balanced scorecard is proposed by establishing a set of generic measures and six perspectives. A case study conducted at the Singapore Hospital applies the conceptual model to describe the purchasing department and the activities within and outside the department. The results indicate that the material management department has already made a good start in measuring the procurement process through the implementation of the balanced scorecard. There are many data that are collected but not properly collated and utilized. Areas lacking measurement include cycle time of delivery, order processing time, effectiveness, efficiency and reliability. Though a lot of hard work was involved, the advantages of establishing a measurement system outweigh the costs and efforts involved in its implementation. Results of balanced scorecard measurements provide decision-makers with critical information on efficiency and effectiveness of the purchasing department's work. The measurement model developed could be used for any hospital procurement system.
Arizona TeleMedicine Network: System Procurement Specifications, Phase 1.
ERIC Educational Resources Information Center
Atlantic Research Corp., Alexandria, VA.
Defining the system procurement specifications for a telecommunications system designed to provide health services to rurally isolated American Indians living on reservations in Arizona, this document presents detailed specifications for: (1) a complete communications facility; (2) a mobile health communications treatment and diagnosis unit; (3)…
Willging, Cathleen E.; Aarons, Gregory A.; Trott, Elise M.; Green, Amy E.; Finn, Natalie; Ehrhart, Mark G.; Hecht, Debra B.
2016-01-01
Sustainment of evidence-based interventions (EBIs) in human services depends on the inner context of community-based organizations (CBOs) that provide services and the outer context of their broader environment. Increasingly, public officials are experimenting with contracting models from for-profit industries to procure human services. In this case study, we conducted qualitative interviews with key government and CBO stakeholders to examine implementation of the Best Value-Performance Information Procurement System to contract for EBIs in a child welfare system. Findings suggest that stakeholder relationships may be compromised when procurement disregards local knowledge, communication, collaboration, and other factors supporting EBIs and public health initiatives. PMID:26386977
DoD Permanently Discontinues Procurement of Global Positioning System Selective Availability
DOT National Transportation Integrated Search
2007-09-18
The Department of Defense announced today that it intends to stop procuring Global Positioning System : (GPS) satellites with the capability to intentionally degrade the accuracy of civil signals. : This capability, known as Selective Availability (S...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 225.403 Section 225.403 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 225.403 Section 225.403 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 225.403 Section 225.403 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 225.403 Section 225.403 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 225.403 Section 225.403 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements...
41 CFR 101-26.301-2 - Issue of used, repaired, and rehabilitated items in serviceable condition.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Issue of used, repaired... and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items...
41 CFR 101-26.507-4 - Quantities in excess of the maximum order limitation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Quantities in excess of... Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.507-4 Quantities in...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Requisitioning data... Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26...
48 CFR 926.7004 - Size standard for Energy Policy Act procurements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Policy Act of 1992 926.7004 Size standard for Energy Policy Act procurements. The size standard for Energy Policy Act engineering services procurements (SIC 8711) shall be the size standard specified for... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Size standard for Energy...
Systems Analysis Directorate Activities Summary August 1977
1977-09-01
are: x a. Cataloging direction b. Requirements computation c. Procurement direction d. Distribution management e. Disposal direction f...34inventory management," as a responsibility of NICP’s, includes cataloging, requirements computation, procurement direction, distribution management , maintenance...functions are cataloging, major item management, secondary item management, procurement direction, distribution management , overhaul and rebuild
48 CFR 227.7011 - Procurement of rights in inventions, patents, and copyrights.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the Government's interest to do so and the desired rights can be obtained at a fair price. The... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Procurement of rights in... COPYRIGHTS Infringement Claims, Licenses, and Assignments 227.7011 Procurement of rights in inventions...
Rethinking health sector procurement as developmental linkages in East Africa.
Mackintosh, Maureen; Tibandebage, Paula; Karimi Njeru, Mercy; Kariuki Kungu, Joan; Israel, Caroline; Mujinja, Phares G M
2018-03-01
Health care forms a large economic sector in all countries, and procurement of medicines and other essential commodities necessarily creates economic linkages between a country's health sector and local and international industrial development. These procurement processes may be positive or negative in their effects on populations' access to appropriate treatment and on local industrial development, yet procurement in low and middle income countries (LMICs) remains under-studied: generally analysed, when addressed at all, as a public sector technical and organisational challenge rather than a social and economic element of health system governance shaping its links to the wider economy. This article uses fieldwork in Tanzania and Kenya in 2012-15 to analyse procurement of essential medicines and supplies as a governance process for the health system and its industrial links, drawing on aspects of global value chain theory. We describe procurement work processes as experienced by front line staff in public, faith-based and private sectors, linking these experiences to wholesale funding sources and purchasing practices, and examining their implications for medicines access and for local industrial development within these East African countries. We show that in a context of poor access to reliable medicines, extensive reliance on private medicines purchase, and increasing globalisation of procurement systems, domestic linkages between health and industrial sectors have been weakened, especially in Tanzania. We argue in consequence for a more developmental perspective on health sector procurement design, including closer policy attention to strengthening vertical and horizontal relational working within local health-industry value chains, in the interests of both wider access to treatment and improved industrial development in Africa. Copyright © 2018 The Authors. Published by Elsevier Ltd.. All rights reserved.
48 CFR 423.404 - Agency affirmative procurement programs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Agency affirmative procurement programs. 423.404 Section 423.404 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL...
48 CFR 423.404 - Agency affirmative procurement programs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Agency affirmative procurement programs. 423.404 Section 423.404 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL...
48 CFR 423.404 - Agency affirmative procurement programs.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Agency affirmative procurement programs. 423.404 Section 423.404 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL...
48 CFR 423.404 - Agency affirmative procurement programs.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Agency affirmative procurement programs. 423.404 Section 423.404 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL...
48 CFR 423.404 - Agency affirmative procurement programs.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Agency affirmative procurement programs. 423.404 Section 423.404 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL...
48 CFR 1323.404 - Agency affirmative procurement programs.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Agency affirmative procurement programs. 1323.404 Section 1323.404 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL...
48 CFR 1323.404 - Agency affirmative procurement programs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Agency affirmative procurement programs. 1323.404 Section 1323.404 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL...
48 CFR 1323.404 - Agency affirmative procurement programs.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Agency affirmative procurement programs. 1323.404 Section 1323.404 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL...
48 CFR 1002.101 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Definitions. 1002.101 Section 1002.101 Federal Acquisition Regulations System DEPARTMENT OF THE TREASURY GENERAL DEFINITIONS OF... the Director, Procurement or the Deputy Director, Procurement. Legal counsel means the Treasury or...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 230.201-5 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF... 230.201-5 Waiver. (a)(1)(A) The military departments and the Director, Defense Procurement and... waiver requests to the Director, Defense Procurement and Acquisition Policy. (2) The military departments...
ERIC Educational Resources Information Center
Chrisman, Gerald J.
1992-01-01
Outlines seven factors that should be considered in the selection of an integrated learning system (ILS): the vendor's educational philosophy; provision of courseware updates; courseware offerings, management systems, customization, and online tools; availability and cost of maintenance support; reasonable terms of procurement; the personnel and…
48 CFR 1323.404-70 - DOC affirmative procurement program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false DOC affirmative procurement program. 1323.404-70 Section 1323.404-70 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES...
48 CFR 1323.404-70 - DOC affirmative procurement program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false DOC affirmative procurement program. 1323.404-70 Section 1323.404-70 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES...
48 CFR 1323.404-70 - DOC affirmative procurement program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false DOC affirmative procurement program. 1323.404-70 Section 1323.404-70 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES...
15 CFR 273.3 - General policy.
Code of Federal Regulations, 2014 CFR
2014-01-01
... the fiscal year 1992, use the metric system of measurement in its procurements, grants, and other... the use of the metric system in their procurements, grants and other business-related activities... STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE METRIC CONVERSION POLICY FOR FEDERAL AGENCIES METRIC...
DOT National Transportation Integrated Search
2009-04-01
This project evaluates the process that was followed by MDOT and other stakeholders for the acquisition : of new Advanced Traffic Management System (ATMS) software aiming to integrate and facilitate the : management of various Intelligent Transportat...
A Conceptual View of the Officer Procurement Model (TOPOPS). Technical Report No. 73-73.
ERIC Educational Resources Information Center
Akman, Allan; Nordhauser, Fred
This report presents the conceptual design of a computer-based linear programing model of the Air Force officer procurement system called TOPOPS. The TOPOPS model is an aggregate model which simulates officer accession and training and is directed at optimizing officer procurement in terms of either minimizing cost or maximizing accession quality…
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Short selection process for procurements not to exceed the simplified acquisition threshold. 736.602-5 Section 736.602-5... selection process for procurements not to exceed the simplified acquisition threshold. References to FAR 36...
Cresswell, Kathrin M; Lee, Lisa; Slee, Ann; Coleman, Jamie; Bates, David W; Sheikh, Aziz
2015-01-01
Objectives We studied vendor perspectives about potentially transferable lessons for implementing organisations and national strategies surrounding the procurement of Computerised Physician Order Entry (CPOE)/Clinical Decision Support (CDS) systems in English hospitals. Setting Data were collected from digitally audio-recorded discussions from a series of CPOE/CDS vendor round-table discussions held in September 2014 in the UK. Participants Nine participants, representing 6 key vendors operating in the UK, attended. The discussions were transcribed verbatim and thematically analysed. Results Vendors reported a range of challenges surrounding the procurement and contracting processes of CPOE/CDS systems, including hospitals’ inability to adequately assess their own needs and then select a suitable product, rushed procurement and implementation processes that resulted in difficulties in meaningfully engaging with vendors, as well as challenges relating to contracting leading to ambiguities in implementation roles. Consequently, relationships between system vendors and hospitals were often strained, the vendors attributing this to a lack of hospital management's appreciation of the complexities associated with implementation efforts. Future anticipated challenges included issues surrounding the standardisation of data to enable their aggregation across systems for effective secondary uses, and implementation of data exchange with providers outside the hospital. Conclusions Our results indicate that there are significant issues surrounding capacity to procure and optimise CPOE/CDS systems among UK hospitals. There is an urgent need to encourage more synergistic and collaborative working between providers and vendors and for a more centralised support for National Health Service hospitals, which draws on a wider body of experience, including a formalised procurement framework with value-based product specifications. PMID:26503385
36 CFR 1210.44 - Procurement procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards...
36 CFR 1210.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards...
36 CFR 1210.44 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards...
DeBoer, Mark D; Cherñavvsky, Daniel R; Topchyan, Katarina; Kovatchev, Boris P; Francis, Gary L; Breton, Marc D
2017-11-01
To evaluate the safety and performance of using a heart rate (HR) monitor to inform an artificial pancreas (AP) system during exercise among adolescents with type 1 diabetes (T1D). In a randomized, cross-over trial, adolescents with T1D age 13 - 18 years were enrolled to receive on separate days either the unmodified UVa AP (stdAP) or an AP system connected to a portable HR monitor (AP-HR) that triggered an exercise algorithm for blood glucose (BG) control. During admissions participants underwent a structured exercise regimen. Hypoglycemic events and CGM tracings were compared between the two admissions, during exercise and for the full 24-hour period. Eighteen participants completed the trial. While number of hypoglycemic events during exercise and rest was not different between visits (0.39 AP-HR vs 0.50 stdAP), time below 70 mg dL -1 was lower on AP-HR compared to stdAP, 0.5±2.1% vs 7.4±12.5% (P = 0.028). Time with BG within 70-180 mg dL -1 was higher for the AP-HR admission vs stdAP during the exercise portion and overall (96% vs 87%, and 77% vs 74%), but these did not reach statistical significance (P = 0.075 and P = 0.366). Heart rate signals can safely and efficaciously be integrated in a wireless AP system to inform of physical activity. While exercise contributes to hypoglycemia among adolescents, even when using an AP system, informing the system of exercise via a HR monitor improved time <70 mg dL -1 . Nonetheless, it did not significantly reduce the total number of hypoglycemic events, which were low in both groups. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.
48 CFR 9904.406 - Cost accounting standard-cost accounting period.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard-cost accounting period. 9904.406 Section 9904.406 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT...
NASA Technical Reports Server (NTRS)
Schlagheck, R. A.
1977-01-01
New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.
36 CFR § 1210.44 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement...
22 CFR 145.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-04-01
... metric system of measurement. (vi) Preference, to the extent practicable and economically feasible, for... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 145...
2016-01-01
evaluation method that identifies the root causes of an undesired outcome and the Summary xix Root Cause of the JPALS Nunn-McCurdy Breach Under current... evaluation (RDT&E) unit (from 12 to 11) and an increase of one procurement unit for a new total of 27 procurement units. The revised procurement quantity...from the status of the overall portfolio of MDAPs and the status of other subportfolios. In assessing a portfolio, analysts may need to evaluate the
Collaborative Procurement Initiative
GPP's Clean Energy Collaborative Procurement Initiative provides a platform for deploying clean energy technologies across multiple government and educational organizations for maximum impact on installed solar system capacity and local economic activity.
24 CFR 84.44 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-04-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84...
24 CFR 84.44 - Procurement procedures.
Code of Federal Regulations, 2014 CFR
2014-04-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84...
24 CFR 84.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-04-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84...
24 CFR 84.44 - Procurement procedures.
Code of Federal Regulations, 2011 CFR
2011-04-01
... dimensioned in the metric system of measurement. (vi) Preference, to the extent practicable and economically... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Morrow, J.J.; Burris, R.A.; Watson, D.J.
1977-05-01
This report is intended to provide guidelines for the preparation of procurements specifications for aircraft survivability enhancement equipment, for the survivability/vulnerability (S/V) tasks associated with the procurement of a total aircraft system or its relate subsystems, and also for the modification of current fleet aircraft to their related subsystems. It is intended that these S/V procurement guidelines be applied to the procurement of all military aircraft, aircraft subsystems, and aircraft componenets which can either lose their functional capability of have their performance degraded as a result of interactions with the damage mechanisms of threat weapons. The guidelines should be appliedmore » to preliminary design programs, to production programs, and to programs that will retrofit or modify existing systems. These guidelines include general requirements statements for the establishment of an S/V program, requirements statements for reducing the susceptibility of the system to the threat weapons, and requirements for the reduction of vulnerability to nonnuclear, nuclear, and laser weapon effects. Requirements for S/V assessments and the verification of vulnerability levels and survival enhancement features are also included. Although nuclear and laser weapon effects are included, the major emphasis is on the reduction of susceptibility and vulnerability to conventional weapons and the establishment of the S/V program.« less
Teichgräber, Ulf K; de Bucourt, Maximilian
2012-01-01
OJECTIVES: To eliminate non-value-adding (NVA) waste for the procurement of endovascular stents in interventional radiology services by applying value stream mapping (VSM). The Lean manufacturing technique was used to analyze the process of material and information flow currently required to direct endovascular stents from external suppliers to patients. Based on a decision point analysis for the procurement of stents in the hospital, a present state VSM was drawn. After assessment of the current status VSM and progressive elimination of unnecessary NVA waste, a future state VSM was drawn. The current state VSM demonstrated that out of 13 processes for the procurement of stents only 2 processes were value-adding. Out of the NVA processes 5 processes were unnecessary NVA activities, which could be eliminated. The decision point analysis demonstrated that the procurement of stents was mainly a forecast driven push system. The future state VSM applies a pull inventory control system to trigger the movement of a unit after withdrawal by using a consignment stock. VSM is a visualization tool for the supply chain and value stream, based on the Toyota Production System and greatly assists in successfully implementing a Lean system. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.
41 CFR 101-26.800 - Scope of subpart.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Scope of subpart. 101-26... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND... Scope of subpart. This subpart prescribes a uniform system for reporting discrepancies or deficiencies...
41 CFR 101-26.800 - Scope of subpart.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Scope of subpart. 101-26... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND... Scope of subpart. This subpart prescribes a uniform system for reporting discrepancies or deficiencies...
41 CFR 101-26.800 - Scope of subpart.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Scope of subpart. 101-26... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND... Scope of subpart. This subpart prescribes a uniform system for reporting discrepancies or deficiencies...
Antiretroviral drug supply challenges in the era of scaling up ART in Malawi.
Schouten, Erik J; Jahn, Andreas; Ben-Smith, Anne; Makombe, Simon D; Harries, Anthony D; Aboagye-Nyame, Francis; Chimbwandira, Frank
2011-07-06
The number of people receiving antiretroviral treatment (ART) has increased considerably in recent years and is expected to continue to grow in the coming years. A major challenge is to maintain uninterrupted supplies of antiretroviral (ARV) drugs and prevent stock outs. This article discusses issues around the management of ARVs and prevention of stock outs in Malawi, a low-income country with a high HIV/AIDS burden, and a weak procurement and supply chain management system. This system for ARVs, paid for by the Global Fund to Fight AIDS, Tuberculosis and Malaria, and bypassing the government Central Medical Stores, is in place, using the United Nations Children's Fund's (UNICEF's) procurement services. The system, managed by a handful of people who spend limited time on supply management, is characterized by a centrally coordinated quantification based on verified data from all national ART clinics, parallel procurement through UNICEF, and direct distribution to ART clinics. The model worked well in the first years of the ART programme with a single first-line ARV regimen, but with more regimens becoming available (e.g., alternative first-line, second-line and paediatric regimens), it has become more difficult to administer. Managing supplies through a parallel system has the advantage that weaknesses in the national system have limited influence on the ARV procurement and supply chain management system. However, as the current system operates without a central warehouse and national buffer stock capacity, it diminishes the ability to prevent ARV stock outs. The process of ordering ARVs, from the time that estimates are made to the arrival of supplies in health facilities, takes approximately one year. Addressing the challenges involved in maintaining ARVs through an efficient procurement and supply chain management system that prevents ARV stock outs through the establishment of a dedicated procurement team, a central warehouse and/or national buffer stock is a priority.
Commercialization and Field Distribution of Smart Pedestrian Call Signals
DOT National Transportation Integrated Search
2010-06-01
The research on this project resulted in a new design for an accessible pedestrian system (APS) that uses Ethernet communications to implement a distributed control system. Present APS designs represent a safety risk factor by APS systems having unde...
77 FR 13013 - Defense Federal Acquisition Regulation Supplement; Technical Amendments
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-05
... Organization Government Procurement Agreement and the Free Trade Agreements, as determined by the United States... 252 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations System...
NASA Procurement Career Development Program
NASA Technical Reports Server (NTRS)
1987-01-01
The NASA Procurement Career Development Program establishes an agency-wide framework for the management of career development activity in the procurement field. Within this framework, installations are encouraged to modify the various components to meet installation-specific mission and organization requirements. This program provides a systematic process for the assessment of and planning for the development, training, and education required to increase the employees' competence in the procurement work functions. It includes the agency-wide basic knowledge and skills by career field and level upon which individual and organizational development plans are developed. Also, it provides a system that is compatible with other human resource management and development systems, processes, and activities. The compatibility and linkage are important in fostering the dual responsibility of the individual and the organization in the career development process.
48 CFR 2901.603-72 - Administrative procurement management reviews.
Code of Federal Regulations, 2014 CFR
2014-10-01
... improvement of managerial controls and best practices. (b) The administrative procurement review system is a three-pronged approach that includes self-assessment, statistical data for validation, and flexible...
48 CFR 2901.603-72 - Administrative procurement management reviews.
Code of Federal Regulations, 2011 CFR
2011-10-01
... improvement of managerial controls and best practices. (b) The administrative procurement review system is a three-pronged approach that includes self-assessment, statistical data for validation, and flexible...
48 CFR 2901.603-72 - Administrative procurement management reviews.
Code of Federal Regulations, 2012 CFR
2012-10-01
... improvement of managerial controls and best practices. (b) The administrative procurement review system is a three-pronged approach that includes self-assessment, statistical data for validation, and flexible...
48 CFR 2901.603-72 - Administrative procurement management reviews.
Code of Federal Regulations, 2013 CFR
2013-10-01
... improvement of managerial controls and best practices. (b) The administrative procurement review system is a three-pronged approach that includes self-assessment, statistical data for validation, and flexible...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard....501 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST...
41 CFR 101-26.200 - Scope of subpart.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Scope of subpart. 101-26... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.2-Federal Requisitioning System § 101-26.200 Scope of subpart. This subpart prescribes a...
41 CFR 101-26.200 - Scope of subpart.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Scope of subpart. 101-26... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.2-Federal Requisitioning System § 101-26.200 Scope of subpart. This subpart prescribes a...
41 CFR 101-26.200 - Scope of subpart.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Scope of subpart. 101-26... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.2-Federal Requisitioning System § 101-26.200 Scope of subpart. This subpart prescribes a...
41 CFR 101-26.200 - Scope of subpart.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Scope of subpart. 101-26... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.2-Federal Requisitioning System § 101-26.200 Scope of subpart. This subpart prescribes a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-06
... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 204 RIN 0750-AH80 Defense Federal Acquisition Regulation Supplement; Clarification of ``F'' Orders in the Procurement Instrument Identification Number Structure (DFARS Case 2012-D040); Correction AGENCY: Defense Acquisition Regulations System...
40 CFR 35.936-2 - Grantee procurement systems; State or local law.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Grantee procurement systems; State or local law. 35.936-2 Section 35.936-2 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS... rational basis. (c) Preference. State or local laws, ordinances, regulations or procedures which...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401 Cost... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard...
Ohkawara, H; Fukushima, N; Kitagawa, T; Ito, T; Masutani, Y; Sawa, Y
2010-01-01
Although organ procurement has been regulated by The Organ Transplantation Law (brain-dead donors since 1997, donors after cardiac death since 1979), there has been no law or governmental procurement network (except for cornea) in Japan. Since the late 1980s, some university hospitals have developed original banks. Finally, in 2001 guidelines for tissue procurement were established by The Japanese Society of Tissue Transplantation and Japan Tissue Transplant Network (JTTN) to coordinate tissue harvesting. Five tissue banks were joined to the tissue transplant network (skin in one, heart valves in two, and bone in two). As the number of tissue banks is small, each bank cooperates on procurement, but cannot cover the entire country. With regard to skin transplantation, only one skin bank-The Japan Skin Bank Network (JSBN), which is located in Tokyo-has organized skin procurement. Therefore, it has been difficult to procure skin in areas distant from Tokyo, especially around Osaka. In order to improve such a situation, a tissue bank collaborating with the JSBN was established at The Medical Center for Translational Research (MTR), Osaka University Hospital in April 2008. The bank has played a role in skin procurement center in western Japan and supported procurement and preservation at the time of the skin procurement. Between April 2008 and September 2009, the bank participated in eight tissue procurements in the western area. In the future, the bank is planning to procure and preserve pancreatic islets and bones. Moreover, there is a plan to set up an induced pluripotent stem cells center and stem cell bank in MTR. This tissue bank may play a role to increase tissue procurement in Japan, especially in the western area. .
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.400 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.400 [Reserved] ...
Advanced APS impacts on vehicle payloads
NASA Technical Reports Server (NTRS)
Schneider, Steven J.; Reed, Brian D.
1989-01-01
Advanced auxiliary propulsion system (APS) technology has the potential to both, increase the payload capability of earth-to-orbit (ETO) vehicles by reducing APS propellant mass, and simplify ground operations and logistics by reducing the number of fluids on the vehicle and eliminating toxic, corrosive propellants. The impact of integrated cryogenic APS on vehicle payloads is addressed. In this system, launch propulsion system residuals are scavenged from integral launch propulsion tanks for use in the APS. Sufficient propellant is preloaded into the APS to return to earth with margin and noncomplete scavenging assumed. No propellant conditioning is required by the APS, but ambient heat soak is accommodated. High temperature rocket materials enable the use of the unconditioned hydrogen/oxygen in the APS and are estimated to give APS rockets specific impulse of up to about 444 sec. The payload benefits are quantified and compared with an uprated monomethylhydrazine/nitrogen tetroxide system in a conservative fashion, by assuming a 25.5 percent weight growth for the hydrogen/oxygen system and a 0 percent weight growth for the uprated system. The combination of scavenging and high performance gives payload impacts which are highly mission specific. A payload benefit of 861 kg (1898 lbm) was estimated for a Space Station Freedom rendezvous mission and 2099 kg (4626 lbm) for a sortie mission, with payload impacts varying with the amount of launch propulsion residual propellants. Missions without liquid propellant scavenging were estimated to have payload penalties, however, operational benefits were still possible.
Advanced APS Impacts on Vehicle Payloads
NASA Technical Reports Server (NTRS)
Schneider, Steven J.; Reed, Brian D.
1989-01-01
Advanced auxiliary propulsion system (APS) technology has the potential to both, increase the payload capability of earth-to-orbit (ETO) vehicles by reducing APS propellant mass, and simplify ground operations and logistics by reducing the number of fluids on the vehicle and eliminating toxic, corrosive propellants. The impact of integrated cryogenic APS on vehicle payloads is addressed. In this system, launch propulsion system residuals are scavenged from integral launch propulsion tanks for use in the APS. Sufficient propellant is preloaded into the APS to return to earth with margin and noncomplete scavenging assumed. No propellant conditioning is required by the APS, but ambient heat soak is accommodated. High temperature rocket materials enable the use of the unconditioned hydrogen/oxygen in the APS and are estimated to give APS rockets specific impulse of up to about 444 sec. The payload benefits are quantified and compared with an uprated monomethyl hydrazine/nitrogen tetroxide system in a conservative fashion, by assuming a 25.5 percent weight growth for the hydrogen/oxygen system and a 0 percent weight growth for the uprated system. The combination and scavenging and high performance gives payload impacts which are highly mission specific. A payload benefit of 861 kg (1898 lbm) was estimated for a Space Station Freedom rendezvous mission and 2099 kg (4626 lbm) for a sortie mission, with payload impacts varying with the amount of launch propulsion residual propellants. Missions without liquid propellant scavenging were estimated to have payload penalties, however, operational benefits were still possible.
Long-Term Implications of the 2016 Future Years Defense Program
2016-01-01
operation and maintenance activities; acquisition includes research, development, test, and evaluation as well as procurement of weapon systems and other...group includes procurement and research, development, test, and evaluation (RDT&E). Appropriations for procurement fund the purchase of new weapon...and Evaluation Military Construction Family Housing OCO Funding Actual FYDP Period Beyond the FYDP PeriodDoD’s Estimates For 2017 through 2020 DoD
Numerical Test of the Additivity Principle in Anomalous Transport
NASA Astrophysics Data System (ADS)
Tamaki, Shuji
2017-10-01
The additivity principle (AP) is one of the remarkable predictions that systematically generates all information on current fluctuations once the value of average current in the linear response regime is input. However, conditions to justify the AP are still ambiguous. We hence consider three tractable models, and discuss possible conditions. The models include the harmonic chain (HC), momentum exchange (ME) model, and momentum flip (MF) model, which respectively show ballistic, anomalous, and diffusive transport. We compare the heat current cumulants predicted by the AP with exact numerical data obtained for these models. The HC does not show the AP, whereas the MF model satisfies it, as expected, since the AP was originally proposed for diffusive systems. Surprisingly, the ME model also shows the AP. The ME model is known to show the anomalous transport similar to that shown in nonlinear systems such as the Fermi-Pasta-Ulam model. Our finding indicates that general nonlinear systems may satisfy the AP. Possible conditions for satisfying the AP are discussed.
An approach to improve management visibility within the procurement and financial group at Goldstone
NASA Technical Reports Server (NTRS)
Maiocco, F. R.; Rozek, J. B.
1976-01-01
Improvements in the operational efficiency of the data management systems at the Goldstone Deep Space Communications Complex (GDSCC) are discussed. This addresses the existing procurement and financial management data system at GDSCC, identifies management requirements for better visibility, describes a proposed computerized data management system, summarizes results to data, and identifies plans for future development.
Fraser, James A; Huang, Christopher L-H; Pedersen, Thomas H
2011-07-01
Activation of skeletal muscle fibers requires rapid sarcolemmal action potential (AP) conduction to ensure uniform excitation along the fiber length, as well as successful tubular excitation to initiate excitation-contraction coupling. In our companion paper in this issue, Pedersen et al. (2011. J. Gen. Physiol. doi:10.1085/jgp.201010510) quantify, for subthreshold stimuli, the influence upon both surface conduction velocity and tubular (t)-system excitation of the large changes in resting membrane conductance (G(M)) that occur during repetitive AP firing. The present work extends the analysis by developing a multi-compartment modification of the charge-difference model of Fraser and Huang to provide a quantitative description of the conduction velocity of actively propagated APs; the influence of voltage-gated ion channels within the t-system; the influence of t-system APs on ionic homeostasis within the t-system; the influence of t-system ion concentration changes on membrane potentials; and the influence of Phase I and Phase II G(M) changes on these relationships. Passive conduction properties of the novel model agreed with established linear circuit analysis and previous experimental results, while key simulations of AP firing were tested against focused experimental microelectrode measurements of membrane potential. This study thereby first quantified the effects of the t-system luminal resistance and voltage-gated Na(+) channel density on surface AP propagation and the resultant electrical response of the t-system. Second, it demonstrated the influence of G(M) changes during repetitive AP firing upon surface and t-system excitability. Third, it showed that significant K(+) accumulation occurs within the t-system during repetitive AP firing and produces a baseline depolarization of the surface membrane potential. Finally, it indicated that G(M) changes during repetitive AP firing significantly influence both t-system K(+) accumulation and its influence on the resting membrane potential. Thus, the present study emerges with a quantitative description of the changes in membrane potential, excitability, and t-system ionic homeostasis that occur during repetitive AP firing in skeletal muscle.
1968-06-01
procurement of 19,000 new rifles and 1.9 million rounds of 5.56mm am:nunition ;Jere requested in the Air Force 1962 budget. The Department of Defense at...the Department of Defense inventories was not desirable. Air Force Histcry of the ARIS Rifle (Mid-1960 tc Yid- 1962 ), undated. Adoption of a .223 caliber...discussions on the Air Force procurement.3/ Final Congressional authorization for the Air Force procurement was granted 15 May 1962 . The 8,500 rifles
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2012 CFR
2012-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2011 CFR
2011-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2014 CFR
2014-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2010 CFR
2010-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2013 CFR
2013-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
48 CFR 9904.403-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.403-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.403-10 [Reserved] ...
48 CFR 9904.408-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.408-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.408-10 [Reserved] ...
48 CFR 9904.407-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.407-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.407-10 [Reserved] ...
48 CFR 9904.406-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.406-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.406-10 [Reserved] ...
48 CFR 9904.405-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.405-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.405-10 [Reserved] ...
48 CFR 9904.410-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.410-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.410-10 [Reserved] ...
48 CFR 9904.401-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.401-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401-10 [Reserved] ...
48 CFR 9904.402-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.402-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.402-10 [Reserved] ...
48 CFR 9904.404-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.404-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404-10 [Reserved] ...
48 CFR 9904.409-10 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.409-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.409-10 [Reserved] ...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard... Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard... 9905.502 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false Does an exclusion under the Federal procurement system affect a person's eligibility to participate in nonprocurement transactions? 180.145 Section 180.145 Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET GOVERNMENTWIDE GUIDANCE FOR GRANTS...
48 CFR 25.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 25.403 Section 25.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements 25.403 World Trade Organization...
48 CFR 25.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 25.403 Section 25.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements 25.403 World Trade Organization...
48 CFR 25.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 25.403 Section 25.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements 25.403 World Trade Organization...
48 CFR 25.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 25.403 Section 25.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements 25.403 World Trade Organization...
48 CFR 25.403 - World Trade Organization Government Procurement Agreement and Free Trade Agreements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false World Trade Organization Government Procurement Agreement and Free Trade Agreements. 25.403 Section 25.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Trade Agreements 25.403 World Trade Organization...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.402 Cost... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard...
48 CFR 2953.100 - Request for Recommendation by Procurement Review Board DL 1-490.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Request for Recommendation by Procurement Review Board DL 1-490. 2953.100 Section 2953.100 Federal Acquisition Regulations System DEPARTMENT OF LABOR CLAUSE AND FORMS FORMS General 2953.100 Request for Recommendation by...
DISPLA: decision information system for procurement and logistics analysis
NASA Astrophysics Data System (ADS)
Calvo, Alberto B.; Danish, Alexander J.; Lamonakis, Gregory G.
2002-08-01
This paper describes an information-exchange system for Display systems acquisition and logistics support. DISPLA (Decision Information System for Procurement and Logistics Analysis) is an Internet-based system concept for bringing sellers (display system and component suppliers) and buyers (Government Program Offices and System Integrators) together in an electronic exchange to improve the acquisition and logistics analysis support of Flat Panel Displays for the military. A proof-of-concept demonstration is presented in this paper using sample data from vendor Web sites and Government data sources.
Code of Federal Regulations, 2014 CFR
2014-01-01
... be identified as an EDWOSB or WOSB in any Federal procurement databases? 127.701 Section 127.701... Federal procurement databases? (a) In order to be identified as an EDWOSB or WOSB in the System for Award Management (SAM) database (or any successor thereto), a concern must certify its EDWOSB or WOSB status in...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false What must a concern do in order to be identified as a SDB in any Federal procurement database? 124.1016 Section 124.1016 Business Credit... procurement database? (a) In order to be identified as a SDB in the System for Award Management (SAM) database...
Performance of the Defense Acquisition System, 2015 Annual report
2015-09-16
Planned Total (From Start to Completion) Quantity-Adjusted Unit -Procurement Recurring-Flyaway Funding (1999–2014) NOTE: This measures biennial...PAUC is a different funding measure define by statute (10 United States Code [U.S.C.], sections 2430a and 2432) consisting of the total acquisition... measures that (unlike PAUC and APUC) are fully adjusted for any changes in procurement quantity. These results help compare procurement unit costs
Adaptive control of artificial pancreas systems - a review.
Turksoy, Kamuran; Cinar, Ali
2014-01-01
Artificial pancreas (AP) systems offer an important improvement in regulating blood glucose concentration for patients with type 1 diabetes, compared to current approaches. AP consists of sensors, control algorithms and an insulin pump. Different AP control algorithms such as proportional-integral-derivative, model-predictive control, adaptive control, and fuzzy logic control have been investigated in simulation and clinical studies in the past three decades. The variability over time and complexity of the dynamics of blood glucose concentration, unsteady disturbances such as meals, time-varying delays on measurements and insulin infusion, and noisy data from sensors create a challenging system to AP. Adaptive control is a powerful control technique that can deal with such challenges. In this paper, a review of adaptive control techniques for blood glucose regulation with an AP system is presented. The investigations and advances in technology produced impressive results, but there is still a need for a reliable AP system that is both commercially viable and appealing to patients with type 1 diabetes.
Vaccine procurement and self-sufficiency in developing countries.
Woodle, D
2000-06-01
This paper discusses the movement toward self-sufficiency in vaccine supply in developing countries (and countries in transition to new economic and political systems) and explains special supply concerns about vaccine as a product class. It traces some history of donor support and programmes aimed at self-financing, then continues with a discussion about self-sufficiency in terms of institutional capacity building. A number of deficiencies commonly found in vaccine procurement and supply in low- and middle-income countries are characterized, and institutional strengthening with procurement technical assistance is described. The paper also provides information about a vaccine procurement manual being developed by the United States Agency for International Development (USAID) and the World Health Organization (WHO) for use in this environment. Two brief case studies are included to illustrate the spectrum of existing capabilities and different approaches to technical assistance aimed at developing or improving vaccine procurement capability. In conclusion, the paper discusses the special nature of vaccine and issues surrounding potential integration and decentralization of vaccine supply systems as part of health sector reform.
DOT National Transportation Integrated Search
1997-01-01
This paper documents the contracting and procurement issues and opportunities encountered by VDOT in developing what was their first public-private partnership agreement for an Intelligent Transportation System (ITS).
13 CFR 127.604 - How will SBA process an EDWOSB or WOSB status protest?
Code of Federal Regulations, 2012 CFR
2012-01-01
... women claiming economic disadvantage and their spouses, unless the individuals and their spouses are... officer must update the Federal Procurement Data System and other procurement reporting databases to...
FHWA Federal-Aid ITS Procurement Regulations and Contracting Options
DOT National Transportation Integrated Search
1997-10-01
State and local agencies planning to procure Intelligent Transportation Systems (ITS) projects with Federal highway funds face unique challenges. They must choose appropriate contracting techniques that optimize project quality and cost while meeting...
Zhang, Zhenhai; Cui, Changchang; Wei, Fang; Lv, Huixia
2017-08-01
The aim of this study was to develop a novel mix micelles system composing of two biocompatible copolymers of Soluplus ® and Pluronic F127 to improve the solubility, oral bioavailability of insoluble drug apigenin (AP) as model drug. The AP-loaded mixed micelles (AP-M) were prepared by ethanol thin-film hydration method. The formed optimal formulation of AP-M were provided with small size (178.5 nm) and spherical shape at ratio of 4:1 (Soluplus ® :Pluronic F127), as well as increasing solubility of to 5.61 mg/mL in water which was about 3442-fold compared to that of free AP. The entrapment efficiency and drug loading of AP-M were 95.72 and 5.32%, respectively, and a sustained release of AP-M was obtained as in vitro release study indicated. Transcellular transport study showed that the cell uptake of AP was increased in Caco-2 cell transport models. The oral bioavailability of AP-M was 4.03-fold of free AP in SD rats, indicating the mixed micelles of Soluplus ® and Pluronic F127 is an industrially feasible drug delivery system to promote insoluble drug oral absorption in the gastrointestinal tract.
Organ procurement: Spanish transplant procurement management.
Manyalich, Martí; Mestres, Carlos A; Ballesté, Chloë; Páez, Gloria; Valero, Ricard; Gómez, María Paula
2011-06-01
Transplantation is an accepted therapeutic option to save or improve the quality of life when organ failure occurs or tissue replacements are needed. However, the lack of organs is the major limitation. The deceased organ procurement organization and professionals provide the solution to this international problem. In this review, we identify the elements involved in the organ procurement management process to analyze the possibility of implementation of deceased organ procurement for a transplantation program. While the donation rates are subject to several negative factors including religious, economic, cultural, and legal issues, the existence of well-trained professionals may considerably increase them. Professional training in organ donation along with the establishment of a solid organizational system has been identified as the crucial factor in developing efficient organ donation and transplantation programs.
NASA Astrophysics Data System (ADS)
Tsutsui, Shigeyosi
This paper proposes an aggregation pheromone system (APS) for solving real-parameter optimization problems using the collective behavior of individuals which communicate using aggregation pheromones. APS was tested on several test functions used in evolutionary computation. The results showed APS could solve real-parameter optimization problems fairly well. The sensitivity analysis of control parameters of APS is also studied.
NASA Technical Reports Server (NTRS)
Grantier, David
2003-01-01
This paper presents viewgraphs on the development of the Weather Accident Prevention (WxAP) System architecture and Concept of Operation (CONOPS) activities. The topics include: 1) Background Information on System Architecture/CONOPS Activity; 2) Activity Work in Progress; and 3) Anticipated By-Products.
Work performed by Enterprise Companies (Enco) for (PHMC) for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
Enterprise Companies are affiliated for the Prime and Major Subcontractors on site at Hanford. Business with them is handled and recorded in a manner very similar to working with independent vendors. In the to-be environment, all procurement of services from Enco`s will be processed in the Passport Procurement System.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Short selection process for procurements not to exceed the simplified acquisition threshold. 736.602-5 Section 736.602-5 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACT...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Short selection process for procurements not to exceed the simplified acquisition threshold. 736.602-5 Section 736.602-5 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACT...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Short selection process for procurements not to exceed the simplified acquisition threshold. 736.602-5 Section 736.602-5 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACT...
48 CFR 9904.402-62 - Exemption.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.402-62 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.402-62 Exemption. None for this Standard. ...
48 CFR 9904.405-62 - Exemption.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.405-62 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.405-62 Exemption. None for this Standard. ...
48 CFR 9904.404-62 - Exemption.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.404-62 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404-62 Exemption. None for this Standard. ...
48 CFR 9904.401-62 - Exemption.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.401-62 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401-62 Exemption. None for this Standard. ...
48 CFR 9904.407-62 - Exemption.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.407-62 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.407-62 Exemption. None for this Standard. ...
48 CFR 9904.403-62 - Exemption. [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
....403-62 Section 9904.403-62 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.403-62 Exemption. [Reserved] ...
48 CFR 9904.406-62 - Exemption.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.406-62 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.406-62 Exemption. None for this Standard. ...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-16
... Testing 11. Buy America 12. Corridor Preservation 13. Rail Car Procurements 14. Veterans Preference... transit assistance; to conduct State Safety Oversight, drug and alcohol, civil rights, procurement systems...
Addendum to the Final Audit Report on Procurement of Spare Parts and Supplies
1993-06-04
Contraves USA, Simulation and Systems Integration, Tampa, FL Contract No.: N00104-89-G-A050-4009 Awarded: April 20, 1990 Procurement Method...awarded sole source to Contraves . The amplifier is a source-controlled item, and Contraves is the only approved source. There are no commercial...The total contract value was $69,552. Contraves assembled and tested the amplifiers. For the subject procurement, Contraves paid $* per unit for the
A new method for E-government procurement using collaborative filtering and Bayesian approach.
Zhang, Shuai; Xi, Chengyu; Wang, Yan; Zhang, Wenyu; Chen, Yanhong
2013-01-01
Nowadays, as the Internet services increase faster than ever before, government systems are reinvented as E-government services. Therefore, government procurement sectors have to face challenges brought by the explosion of service information. This paper presents a novel method for E-government procurement (eGP) to search for the optimal procurement scheme (OPS). Item-based collaborative filtering and Bayesian approach are used to evaluate and select the candidate services to get the top-M recommendations such that the involved computation load can be alleviated. A trapezoidal fuzzy number similarity algorithm is applied to support the item-based collaborative filtering and Bayesian approach, since some of the services' attributes can be hardly expressed as certain and static values but only be easily represented as fuzzy values. A prototype system is built and validated with an illustrative example from eGP to confirm the feasibility of our approach.
A New Method for E-Government Procurement Using Collaborative Filtering and Bayesian Approach
Wang, Yan
2013-01-01
Nowadays, as the Internet services increase faster than ever before, government systems are reinvented as E-government services. Therefore, government procurement sectors have to face challenges brought by the explosion of service information. This paper presents a novel method for E-government procurement (eGP) to search for the optimal procurement scheme (OPS). Item-based collaborative filtering and Bayesian approach are used to evaluate and select the candidate services to get the top-M recommendations such that the involved computation load can be alleviated. A trapezoidal fuzzy number similarity algorithm is applied to support the item-based collaborative filtering and Bayesian approach, since some of the services' attributes can be hardly expressed as certain and static values but only be easily represented as fuzzy values. A prototype system is built and validated with an illustrative example from eGP to confirm the feasibility of our approach. PMID:24385869
75 FR 57920 - Kerr-Philpott System
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-23
... schedules VA-1-B, VA-2-B, VA-3- B, VA-4-B, CP&L-1-B, CP&L-2-B, CP&L-3-B, CP&L-4-B, AP-1-B, AP-2-B, AP- 3-B..., CP&L-1-A, CP&L-2-A, CP&L-3-A, CP&L-4-A, AP-1-A, AP-2-A, AP-3-A, AP-4-A, NC-1-A, and Replacement-2... Schedules VA-1-A, VA-2-A, VA-3-A, VA-4-A, CP&L-1- A, CP&L-2-A, CP&L-3-A, CP&L-4-A, AP-1-A, AP-2-A, AP-3-A...
NASA Astrophysics Data System (ADS)
Ramantoko, Gadang; Irawan, Herry
2017-10-01
This research examines the factors influencing the Information Sharing Model in Supporting Implementation of e-Procurement Services: Case of Bandung City in its early maturity stage. The early maturity of information sharing stage was determined using e-Government Maturity Stage Conceptual Framework from Estevez. Bandung City e-Procurement Information Sharing system was categorized at stage 1 in Estevez' model where the concern was mainly on assessing the benefit and risk of implementing the system. The Authors were using DeLone & McLean (D&M) Information System Success model to study benefit and risk of implementing the system in Bandung city. The model was then empirically tested by employing survey data that was collected from the available 40 listed supplier firms. D&M's model adjusted by Klischewski's description was introducing Information Quality, System Quality, and Service Quality as independent variable; Usability and User Satisfaction as intermediate dependent variable; and Perceived Net Benefit as final dependent variable. The findings suggested that, all of the predictors in D&M's model significantly influenced the net perceived benefit of implementing the e-Procurement system in the early maturity stage. The theoretical contribution of this research suggested that D&M's model might find useful in modeling complex information technology successfulness such as the one used in e-Procurement service. This research could also have implications for policy makers (LPSE) and system providers (LKPP) following the introduction of the service. However, the small number of respondent might be considered limitation of the study. The model needs to be further tested using larger number of respondents by involving the population of the firms in extended boundary/municipality area around Bandung.
The Hyperspectral Imager for the Coastal Ocean (HICO): Sensor and Data Processing Overview
2010-01-20
backscattering coefficients, and others. Several of these software modules will be developed within the Automated Processing System (APS), a data... Automated Processing System (APS) NRL developed APS, which processes satellite data into ocean color data products. APS is a collection of methods...used for ocean color processing which provide the tools for the automated processing of satellite imagery [1]. These tools are in the process of
48 CFR 19.505 - Rejecting Small Business Administration recommendations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Administration recommendations. 19.505 Section 19.505 Federal Acquisition Regulations System FEDERAL ACQUISITION... Small Business Administration recommendations. (a) If the contracting officer rejects a recommendation... the recommendation. (b) The SBA procurement center representative (or, if a procurement center...
48 CFR 9905.505-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9905.505-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS FOR EDUCATIONAL INSTITUTIONS 9905.505-60 Illustrations. (a) An auditor...
48 CFR 9904.418-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.418-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.418-60 Illustrations. (a) Business Unit A has various...
Procurement Without Problems: Preparing the RFP.
ERIC Educational Resources Information Center
Epstein, Susan Baerg
1983-01-01
Discussion of factors contributing to successful procurement of automated library system focuses on preparation of Request for Proposal (RFP) and elements included in the RFP--administrative requirements, functional requirements, performance requirements, reliability requirements, testing procedures, standardized response language, location table,…
48 CFR 9903.305 - Materiality.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9903.305 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS... Government funding. Changes in accounting treatment will have more impact if they influence the distribution...
48 CFR 619.402 - Small Business Administration procurement center representatives.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Small Business... DEPARTMENT OF STATE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation with the Small Business Administration 619.402 Small Business Administration procurement center representatives. ...
20 CFR 641.856 - What functions and activities constitute costs of administration?
Code of Federal Regulations, 2010 CFR
2010-04-01
..., including: (i) Accounting, budgeting, financial, and cash management functions; (ii) Procurement and purchasing functions; (iii) Property management functions; (iv) Personnel management functions; (v) Payroll... example, personnel, procurement, purchasing, property management, accounting, and payroll systems...
48 CFR 9904.409-61 - Interpretation. [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
...] 9904.409-61 Section 9904.409-61 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.409-61 Interpretation. [Reserved] ...
48 CFR 9904.407-61 - Interpretation. [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
...] 9904.407-61 Section 9904.407-61 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.407-61 Interpretation. [Reserved] ...
48 CFR 9904.406-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.406-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.406-60 Illustrations. (a) A contractor allocates general management...
48 CFR 9904.405-61 - Interpretation. [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
...] 9904.405-61 Section 9904.405-61 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.405-61 Interpretation. [Reserved] ...
48 CFR 9904.401-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.401-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401-60 Illustrations. (a) The following examples are illustrative...
48 CFR 9904.405-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.405-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.405-60 Illustrations. (a) An auditor recommends disallowance of...
48 CFR 9904.402-61 - Interpretation.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-61 Section 9904.402-61 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.402-61 Interpretation. (a) 9904.402, Cost Accounting...
48 CFR 9904.410-61 - Interpretation. [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
...] 9904.410-61 Section 9904.410-61 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.410-61 Interpretation. [Reserved] ...
48 CFR 9904.404-61 - Interpretation. [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
...] 9904.404-61 Section 9904.404-61 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404-61 Interpretation. [Reserved] ...
48 CFR 9904.408-61 - Interpretation. [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
...] 9904.408-61 Section 9904.408-61 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.408-61 Interpretation. [Reserved] ...
48 CFR 9904.404 - Capitalization of tangible assets.
Code of Federal Regulations, 2010 CFR
2010-10-01
... assets. 9904.404 Section 9904.404 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404 Capitalization of tangible assets. ...
48 CFR 9904.409-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.409-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.409-60 Illustrations. The following examples are illustrative of...
48 CFR 9904.412-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.412-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.412-60 Illustrations. (a) Components of pension cost. (1...
48 CFR 619.402 - Small Business Administration procurement center representatives.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Small Business... DEPARTMENT OF STATE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation with the Small Business Administration 619.402 Small Business Administration procurement center representatives. ...
48 CFR 619.402 - Small Business Administration procurement center representatives.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Small Business... DEPARTMENT OF STATE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation with the Small Business Administration 619.402 Small Business Administration procurement center representatives. ...
48 CFR 619.402 - Small Business Administration procurement center representatives.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Small Business... DEPARTMENT OF STATE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation with the Small Business Administration 619.402 Small Business Administration procurement center representatives. ...
48 CFR 619.402 - Small Business Administration procurement center representatives.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Small Business... DEPARTMENT OF STATE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation with the Small Business Administration 619.402 Small Business Administration procurement center representatives. ...
DiAs User Interface: A Patient-Centric Interface for Mobile Artificial Pancreas Systems
Keith-Hynes, Patrick; Guerlain, Stephanie; Mize, Benton; Hughes-Karvetski, Colleen; Khan, Momin; McElwee-Malloy, Molly; Kovatchev, Boris P.
2013-01-01
Background Recent in-hospital studies of artificial pancreas (AP) systems have shown promising results in improving glycemic control in patients with type 1 diabetes mellitus. The next logical step in AP development is to conduct transitional outpatient clinical trials with a mobile system that is controlled by the patient. In this article, we present the user interface (UI) of the Diabetes Assistant (DiAs), an experimental smartphone-based mobile AP system, and describe the reactions of a round of focus groups to the UI. This work is an initial inquiry involving a relatively small number of potential users, many of whom had never seen an AP system before, and the results should be understood in that light. Methods We began by considering how the UI of an AP system could be designed to make use of the familiar touch-based graphical UI of a consumer smartphone. After developing a working prototype UI, we enlisted a human factors specialist to perform a heuristic expert analysis. Next we conducted a formative evaluation of the UI through a series of three focus groups with N = 13 potential end users as participants. The UI was modified based upon the results of these studies, and the resulting DiAs system was used in transitional outpatient AP studies of adults in the United States and Europe. Results The DiAs UI was modified based on focus group feedback from potential users. The DiAs was subsequently used in JDRF- and AP@Home-sponsored transitional outpatient AP studies in the United States and Europe by 40 subjects for 2400 h with no adverse events. Conclusions Adult patients with type 1 diabetes mellitus are able to control an AP system successfully using a patient-centric UI on a commercial smartphone in a transitional outpatient environment. PMID:24351168
DOE Office of Scientific and Technical Information (OSTI.GOV)
DEXTER, M.L.
1999-11-15
This document serves as a notice of construction (NOC) pursuant to the requirements of Washington Administrative Code (WAC) 246 247-060, and as a request for approval to modify pursuant to 40 Code of Federal Regulations (CFR) 61 07 for the installation and operation of one waste retrieval system in the 24 1 AP-102 Tank and one waste retrieval system in the 241 AP 104 Tank Pursuant to 40 CFR 61 09 (a)( 1) this application is also intended to provide anticipated initial start up notification Its is requested that EPA approval of this application will also constitute EPA acceptance ofmore » the initial start up notification Project W 211 Initial Tank Retrieval Systems (ITRS) is scoped to install a waste retrieval system in the following double-shell tanks 241-AP 102-AP 104 AN 102, AN 103, AN-104, AN 105, AY 102 AZ 102 and SY-102 between now and the year 2011. Because of the extended installation schedules and unknowns about specific activities/designs at each tank, it was decided to submit NOCs as that information became available This NOC covers the installation and operation of a waste retrieval system in tanks 241 AP-102 and 241 AP 104 Generally this includes removal of existing equipment installation of new equipment and construction of new ancillary equipment and buildings Tanks 241 AP 102 and 241 AP 104 will provide waste feed for immobilization into a low activity waste (LAW) product (i.e. glass logs) The total effective dose equivalent (TEDE) to the offsite maximally exposed individual (MEI) from the construction activities is 0 045 millirem per year The unabated TEDE to the offsite ME1 from operation of the mixer pumps is 0 042 millirem per year.« less
Leaching of a copper flotation concentrate with ammonium persulfate in an autoclave system
NASA Astrophysics Data System (ADS)
Deniz Turan, M.; Soner Altundoğan, H.
2014-09-01
The leaching behavior of a copper flotation concentrate was investigated using ammonium persulfate (APS) in an autoclave system. The decomposition products of APS, active oxygen, and acidic medium were used to extract metals from the concentrate. Leaching experiments were performed to compare the availability of APS as an oxidizing agent for leaching of the concentrate under atmospheric conditions and in an autoclave system. Leaching temperature and APS concentration were found to be important parameters in both leaching systems. Atmospheric leaching studies showed that the metal extractions increased with the increase in APS concentration and temperature (up to 333 K). A similar tendency was determined in the autoclave studies up to 423 K. It was also determined that the metal extractions decreased at temperatures above 423 K due to the passivation of the particle surface by molten elemental sulfur. The results showed that higher copper extractions could be achieved using an autoclave system.
Human rights violations in organ procurement practice in China.
Paul, Norbert W; Caplan, Arthur; Shapiro, Michael E; Els, Charl; Allison, Kirk C; Li, Huige
2017-02-08
Over 90% of the organs transplanted in China before 2010 were procured from prisoners. Although Chinese officials announced in December 2014 that the country would completely cease using organs harvested from prisoners, no regulatory adjustments or changes in China's organ donation laws followed. As a result, the use of prisoner organs remains legal in China if consent is obtained. We have collected and analysed available evidence on human rights violations in the organ procurement practice in China. We demonstrate that the practice not only violates international ethics standards, it is also associated with a large scale neglect of fundamental human rights. This includes organ procurement without consent from prisoners or their families as well as procurement of organs from incompletely executed, still-living prisoners. The human rights critique of these practices will also address the specific situatedness of prisoners, often conditioned and traumatized by a cascade of human rights abuses in judicial structures. To end the unethical practice and the abuse associated with it, we suggest to inextricably bind the use of human organs procured in the Chinese transplant system to enacting Chinese legislation prohibiting the use of organs from executed prisoners and making explicit rules for law enforcement. Other than that, the international community must cease to abet the continuation of the present system by demanding an authoritative ban on the use of organs from executed Chinese prisoners.
CMS Software: Installation Guide and User Manual.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Straut, Christine
A Chemical Inventory Management System (CIMS) is a system or program that is used to track chemicals at a facility or institution. An effective CIMS begins tracking these chemicals at the point of procurement and continues through use and disposal. The management of chemicals throughout the life cycle (procurement to disposal) is a key concept for the secure management of chemicals at any institution.
Purchasing factor concentrates in the 21st century through competitive tendering.
Hay, C R M
2013-09-01
The increasing intensity of treatment, the widespread adoption of factor VIII and IX prophylaxis and increasing usage over the past decade have led to haemophilia becoming an almost uniquely expensive condition to treat. The average adult with severe haemophilia A in the UK used 250,000 IU of factor VIII in 2011/2012, at a cost in excess of £ 100,000 p.a. The cost to the end-user may be considerably higher than this for some US patients supplied by home care companies with high on-costs. This has led to a high level of administrative scrutiny of treatment and an imperative to procure clotting factor concentrates more efficiently and collectively. National procurement schemes have run successfully in various countries and will become commoner. The UK system of procurement is described. This system, following EU procurement rules, evaluated products technically and by price. The price of bioequivalent products was determined by reverse e-auction. Considerable cost reductions were achieved whilst retaining all suppliers and maintaining a degree of prescribing freedom. Elements of this system could be more widely applied. © 2013 John Wiley & Sons Ltd.
Atun, Rifat
2017-01-01
Introduction Improving health systems performance, especially in low-resource settings facing complex disease burdens, can improve population health. Specifically, the efficiency and effectiveness of supply chains and procurement processes for pharmaceuticals, vaccines and other health products has important implications for health system performance. Pharmaceuticals, vaccines and other health products make up a large share of total health expenditure in low-income and middle-income countries (LMICs), and they are critical for delivering health services. Therefore, programmes which achieve cost savings on these expenditures may help improve a health system's efficiency, whereas programmes that increase availability of health products may improve a health system's effectiveness. This systematic review investigates whether changes to supply chains and procurement processes can achieve cost savings and/or improve the availability of drugs in LMICs. Methods Using the PRISMA guidelines for systematic reviews, we searched PubMed, Embase, CINAHL and the Health Economic Evaluation Database to identify. Results We identified 1264 articles, of which 38 were included in our study. We found evidence that centralised procurement and tendering can achieve direct cost savings, while supply chain management programmes can reduce drug stock outs and increase drug availability for populations. Conclusions This research identifies a broad set of programmes which can improve the ways that health systems purchase and delivery health products. On the basis of this evidence, policymakers and programme managers should examine the root causes of inefficiencies in pharmaceutical supply chain and procurement processes in order to determine how best to improve health systems performance in their specific contexts. PMID:28589028
Seidman, Gabriel; Atun, Rifat
2017-01-01
Improving health systems performance, especially in low-resource settings facing complex disease burdens, can improve population health. Specifically, the efficiency and effectiveness of supply chains and procurement processes for pharmaceuticals, vaccines and other health products has important implications for health system performance. Pharmaceuticals, vaccines and other health products make up a large share of total health expenditure in low-income and middle-income countries (LMICs), and they are critical for delivering health services. Therefore, programmes which achieve cost savings on these expenditures may help improve a health system's efficiency, whereas programmes that increase availability of health products may improve a health system's effectiveness. This systematic review investigates whether changes to supply chains and procurement processes can achieve cost savings and/or improve the availability of drugs in LMICs. Using the PRISMA guidelines for systematic reviews, we searched PubMed, Embase, CINAHL and the Health Economic Evaluation Database to identify. We identified 1264 articles, of which 38 were included in our study. We found evidence that centralised procurement and tendering can achieve direct cost savings, while supply chain management programmes can reduce drug stock outs and increase drug availability for populations. This research identifies a broad set of programmes which can improve the ways that health systems purchase and delivery health products. On the basis of this evidence, policymakers and programme managers should examine the root causes of inefficiencies in pharmaceutical supply chain and procurement processes in order to determine how best to improve health systems performance in their specific contexts.
48 CFR 9905.506-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS FOR EDUCATIONAL INSTITUTIONS 9905.506-40 Fundamental...
48 CFR 9904.405-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.405-40 Fundamental requirement. (a) Costs expressly...
48 CFR 9904.414-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.414-40 Fundamental requirement. (a) A contractor's...
48 CFR 9905.505-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS FOR EDUCATIONAL INSTITUTIONS 9905.505-40 Fundamental...
48 CFR 9904.413-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.413-40 Fundamental requirement. (a) Assignment of...
48 CFR 9905.501-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS FOR EDUCATIONAL INSTITUTIONS 9905.501-40 Fundamental...
48 CFR 9904.401-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401-40 Fundamental requirement. (a) A contractor's...
48 CFR 9905.502-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS FOR EDUCATIONAL INSTITUTIONS 9905.502-40 Fundamental...
48 CFR 9904.411-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.411-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.411-60 Illustrations. (a) Contractor “A” has one contract which...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Policy. 4.1601 Section 4... MATTERS Unique Procurement Instrument Identifiers 4.1601 Policy. (a) Procurement Instrument Identifier... regulations, applicable authorities, and agency policies and procedures. (e) Agencies shall not change the...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Policy. 4.1601 Section 4... MATTERS Unique Procurement Instrument Identifiers 4.1601 Policy. (a) Procurement Instrument Identifier... regulations, applicable authorities, and agency policies and procedures. (e) Agencies shall not change the...
48 CFR 9903.301 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9903.301 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS.... Asset accountability unit. See 9904.404-30. Assignment of cost to cost accounting periods. See 9903.302...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.404.20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404.20 Purpose. This Standard requires that, for purposes of cost...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9905.506-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS FOR EDUCATIONAL INSTITUTIONS 9905.506-20 Purpose. The purpose of this...
Code of Federal Regulations, 2010 CFR
2010-10-01
... for the measurement of insurance costs, the assignment of such costs to cost accounting periods, and... Section 9904.416-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING...
Code of Federal Regulations, 2010 CFR
2010-10-01
... measurement and assignment of costs to cost objectives. (b) This Cost Accounting Standard does not cover... Section 9904.411-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING...
48 CFR 9904.412-30 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.412-30 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.412-30 Definitions. (a) The following are definitions of terms...
48 CFR 9904.413-30 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.413-30 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.413-30 Definitions. (a) The following are definitions of terms...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9905.501-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS FOR EDUCATIONAL INSTITUTIONS 9905.501-20 Purpose. The purpose of this...
Code of Federal Regulations, 2010 CFR
2010-10-01
... consistent application of sound cost accounting principles covering all incurred costs. (2) The Standard is... Section 9905.505-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING...
48 CFR 9904.404-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.404-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404-60 Illustrations. (a) Illustrations of costs which must be...
48 CFR 9904.410-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.410-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.410-60 Illustrations. (a) Business Unit A has been including the...
48 CFR 9904.404-63 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-63 Section 9904.404-63 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404-63 Effective date. (a) This Standard is effective...
48 CFR 9904.403-61 - Interpretation.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-61 Section 9904.403-61 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.403-61 Interpretation. (a) Questions have arisen as to...
48 CFR 9904.408-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.408-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.408-60 Illustrations. (a) Company A's vacation plan provides that...
48 CFR 9904.409-63 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-63 Section 9904.409-63 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.409-63 Effective date. (a) This Standard is effective...
48 CFR 9904.402-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.402-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.402-60 Illustrations. (a) Illustrations of costs which are incurred...
48 CFR 9904.409-62 - Exemption.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.409-62 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.409-62 Exemption. This Standard shall not apply where compensation...
48 CFR 9904.407-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.407-60 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.407-60 Illustrations. (a) Contractor A's written practice is to set...
48 CFR 9904.408-62 - Exemption.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.408-62 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.408-62 Exemption. This Standard shall not apply to contracts and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9905.502-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS FOR EDUCATIONAL INSTITUTIONS 9905.502-20 Purpose. The purpose of this...
An Implementation of Integrated Logistic Support for Turkish Armed Forces
1990-06-01
of systems available for sale by friendly countries. Usually the procurement decision is based upon procurement costs so the tendency is to buy the...result from various design alternatives. From the author’s personal experience, careful planning before buying a weapon system would have solved various...convincing the government of the long term advantages of buying the system which has the least life-cycle costs, especially when these costs are spread
AP-102/104 Retrieval control system qualification test procedure
DOE Office of Scientific and Technical Information (OSTI.GOV)
RIECK, C.A.
1999-05-18
This Qualification Test Procedure documents the results of the qualification testing that was performed on the Project W-211, ''Initial Tank Retrieval Systems,'' retrieval control system (RCS) for tanks 241-AP-102 and 241-AP-104. The results confirm that the RCS has been programmed correctly and that the two related hardware enclosures have been assembled in accordance with the design documents.
AP233: An Information Model for Systems Engineering
NASA Technical Reports Server (NTRS)
Siebes, Georg
2009-01-01
In today's world, information is abundant. We have no problems generating it. But we are challenged to find, organize, and exchange information. center dot A standardized model of information can help. Such a model nearly completed its development for Systems Engineering. It is referred to as AP233 (AP = Application Protocol).
Dubos, Aline; Castells-Nobau, Anna; Meziane, Hamid; Oortveld, Merel A.W.; Houbaert, Xander; Iacono, Giovanni; Martin, Christelle; Mittelhaeuser, Christophe; Lalanne, Valérie; Kramer, Jamie M.; Bhukel, Anuradha; Quentin, Christine; Slabbert, Jan; Verstreken, Patrik; Sigrist, Stefan J.; Messaddeq, Nadia; Birling, Marie-Christine; Selloum, Mohammed; Stunnenberg, Henk G.; Humeau, Yann; Schenck, Annette; Herault, Yann
2015-01-01
ATP6AP2, an essential accessory component of the vacuolar H+ ATPase (V-ATPase), has been associated with intellectual disability (ID) and Parkinsonism. ATP6AP2 has been implicated in several signalling pathways; however, little is known regarding its role in the nervous system. To decipher its function in behaviour and cognition, we generated and characterized conditional knockdowns of ATP6AP2 in the nervous system of Drosophila and mouse models. In Drosophila, ATP6AP2 knockdown induced defective phototaxis and vacuolated photoreceptor neurons and pigment cells when depleted in eyes and altered short- and long-term memory when depleted in the mushroom body. In mouse, conditional Atp6ap2 deletion in glutamatergic neurons (Atp6ap2Camk2aCre/0 mice) caused increased spontaneous locomotor activity and altered fear memory. Both Drosophila ATP6AP2 knockdown and Atp6ap2Camk2aCre/0 mice presented with presynaptic transmission defects, and with an abnormal number and morphology of synapses. In addition, Atp6ap2Camk2aCre/0 mice showed autophagy defects that led to axonal and neuronal degeneration in the cortex and hippocampus. Surprisingly, axon myelination was affected in our mutant mice, and axonal transport alterations were observed in Drosophila. In accordance with the identified phenotypes across species, genome-wide transcriptome profiling of Atp6ap2Camk2aCre/0 mouse hippocampi revealed dysregulation of genes involved in myelination, action potential, membrane-bound vesicles and motor behaviour. In summary, ATP6AP2 disruption in mouse and fly leads to cognitive impairment and neurodegeneration, mimicking aspects of the neuropathology associated with ATP6AP2 mutations in humans. Our results identify ATP6AP2 as an essential gene for the nervous system. PMID:26376863
Dubos, Aline; Castells-Nobau, Anna; Meziane, Hamid; Oortveld, Merel A W; Houbaert, Xander; Iacono, Giovanni; Martin, Christelle; Mittelhaeuser, Christophe; Lalanne, Valérie; Kramer, Jamie M; Bhukel, Anuradha; Quentin, Christine; Slabbert, Jan; Verstreken, Patrik; Sigrist, Stefan J; Messaddeq, Nadia; Birling, Marie-Christine; Selloum, Mohammed; Stunnenberg, Henk G; Humeau, Yann; Schenck, Annette; Herault, Yann
2015-12-01
ATP6AP2, an essential accessory component of the vacuolar H+ ATPase (V-ATPase), has been associated with intellectual disability (ID) and Parkinsonism. ATP6AP2 has been implicated in several signalling pathways; however, little is known regarding its role in the nervous system. To decipher its function in behaviour and cognition, we generated and characterized conditional knockdowns of ATP6AP2 in the nervous system of Drosophila and mouse models. In Drosophila, ATP6AP2 knockdown induced defective phototaxis and vacuolated photoreceptor neurons and pigment cells when depleted in eyes and altered short- and long-term memory when depleted in the mushroom body. In mouse, conditional Atp6ap2 deletion in glutamatergic neurons (Atp6ap2(Camk2aCre/0) mice) caused increased spontaneous locomotor activity and altered fear memory. Both Drosophila ATP6AP2 knockdown and Atp6ap2(Camk2aCre/0) mice presented with presynaptic transmission defects, and with an abnormal number and morphology of synapses. In addition, Atp6ap2(Camk2aCre/0) mice showed autophagy defects that led to axonal and neuronal degeneration in the cortex and hippocampus. Surprisingly, axon myelination was affected in our mutant mice, and axonal transport alterations were observed in Drosophila. In accordance with the identified phenotypes across species, genome-wide transcriptome profiling of Atp6ap2(Camk2aCre/0) mouse hippocampi revealed dysregulation of genes involved in myelination, action potential, membrane-bound vesicles and motor behaviour. In summary, ATP6AP2 disruption in mouse and fly leads to cognitive impairment and neurodegeneration, mimicking aspects of the neuropathology associated with ATP6AP2 mutations in humans. Our results identify ATP6AP2 as an essential gene for the nervous system. © The Author 2015. Published by Oxford University Press.
Kanda, Atsuhiro
2015-11-01
(Pro) renin receptor [(P) RR], a key molecule for tissue renin-angiotensin system, was originally identified as Atp6ap2, an accessory subunit for vacuolar H(+)-ATPase that is a multi-subunit proton pump involved in fundamental cellular physiology. In this study, to elucidate the physiological functions of Atp6ap2/ (P) RR during retinal development in mammals, we used Cre-LoxP system to generate photoreceptor-specific conditional knock-out (CKO) mice, and revealed a critical role of Atp6ap2/(P) RR in photoreceptor development. Deletion of photoreceptor Atp6ap2/ (P) RR did not affect retinal cell differentiation, but led to laminar disorganization in the photoreceptor layer with dysfunction of photoreceptors. Cell adhesion and polarity molecules, all of which were co-localized with Atp6ap2 at the apical edge of the developing retina, were dispersed together with mislocalization of retinal progenitors apart from the apical surface in Atp6ap2 conditional knockout mice. Among these molecules, co-immunoprecipitation using retinal homogenates and Atp6ap2/(P) RR-transfected cells showed that Atp6ap2/(P) RR interacted with partitioning defective 3 homolog (Par3) protein, known to play a pivotal role in planar cell polarity in the Par-atypical protein kinase C system. Atp6ap2 interacted with Par3 protein that plays a pivotal role in planar cell polarity. Our data provide a novel function of Atp6ap2 required as a cell polarity determinant for retinal laminar formation.
Acute Lipotoxicity Regulates Severity of Biliary Acute Pancreatitis without Affecting Its Initiation
Durgampudi, Chandra; Noel, Pawan; Patel, Krutika; Cline, Rachel; Trivedi, Ram N.; DeLany, James P.; Yadav, Dhiraj; Papachristou, Georgios I.; Lee, Kenneth; Acharya, Chathur; Jaligama, Deepthi; Navina, Sarah; Murad, Faris; Singh, Vijay P.
2015-01-01
Obese patients have worse outcomes during acute pancreatitis (AP). Previous animal models of AP have found worse outcomes in obese rodents who may have a baseline proinflammatory state. Our aim was to study the role of acute lipolytic generation of fatty acids on local severity and systemic complications of AP. Human postpancreatitis necrotic collections were analyzed for unsaturated fatty acids (UFAs) and saturated fatty acids. A model of biliary AP was designed to replicate the human variables by intraductal injection of the triglyceride glyceryl trilinoleate alone or with the chemically distinct lipase inhibitors orlistat or cetilistat. Parameters of AP etiology and outcomes of local and systemic severity were measured. Patients with postpancreatitis necrotic collections were obese, and 13 of 15 had biliary AP. Postpancreatitis necrotic collections were enriched in UFAs. Intraductal glyceryl trilinoleate with or without the lipase inhibitors resulted in oil red O–positive areas, resembling intrapancreatic fat. Both lipase inhibitors reduced the glyceryl trilinoleate–induced increase in serum lipase, UFAs, pancreatic necrosis, serum inflammatory markers, systemic injury, and mortality but not serum alanine aminotransferase, bilirubin, or amylase. We conclude that UFAs are enriched in human necrotic collections and acute UFA generation via lipolysis worsens pancreatic necrosis, systemic inflammation, and injury associated with severe AP. Inhibition of lipolysis reduces UFA generation and improves these outcomes of AP without interfering with its induction. PMID:24854864
Dual Production Sources in the Procurement of Weapon Systems: A Policy Analysis
1983-11-01
Competitive Aspects of the AIM-9B Seeker Assembly Procurement, memorandum to Carl Wilbourn , U.S. Navy OP-96D, December 16, 1977. 3 sARINC Report, p...Corporation, R-2706-DR&E, February 1981. Carroll, Frank, Competitive Aspects of the AIM-9B Seeker Assembly Procurement, Memorandum to Carl Wilbourn , U.S...David J., and Joseph P. Large, Estimated Costs of Extended Low Rate Airframe Production, The Rand Corporation, R-2243-AF, March 1978, Fisher, Gene H
[Pancreas and biliary tract: recent developments].
de-Madaria, Enrique
2014-09-01
Acute pancreatitis (AP) is a common disease that is associated with significant morbidity and considerable mortality. In this article, developments relating to this disease that were presented in DDW 2014 are reviewed. Pancreatic steatosis could be a cause of recurrent AP. Patients with DM have an increased incidence of AP and pancreatic cancer. The use of anti-TNF drugs in inflammatory bowel disease may protect against the occurrence of AP. The presence of pancreas divisum protects against acute biliary pancreatitis. The PANCODE system for describing local complications of AP has good interobserver agreement, when the new definitions of the revised Atlanta classification are applied. The use of prophylactic antibiotics in early-stage AP predisposes the development of intra-abdominal fungal infections. Fluid sequestration in AP is linked with young age, alcoholism and indicators of systemic inflammatory response syndrome. The most common cause of mortality in AP is early onset of multiple organ failure, not pancreatic necrosis infection. Patients with AP and vitamin D deficiency could benefit from taking vitamin D supplements. Moderate fluid administration in emergencies (500-1000 mL) could be associated with better AP development. Copyright © 2014 Elsevier España, S.L.U. All rights reserved.
48 CFR 9904.403-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.403-40 Fundamental requirement. (a)(1) Home office...
48 CFR 9904.407-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.407-40 Fundamental requirement. Standard costs may be...
48 CFR 9904.411-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.411-40 Fundamental requirement. (a) The contractor shall...
48 CFR 9904.406-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.406-40 Fundamental requirement. (a) A contractor shall...
48 CFR 9904.404-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404-40 Fundamental requirement. (a) The acquisition cost...
48 CFR 9904.402-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.402-40 Fundamental requirement. All costs incurred for...
48 CFR 9904.420-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.420-40 Fundamental requirement. (a) The basic unit for...
48 CFR 9904.410-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.410-40 Fundamental requirement. (a) Business unit G&A...
48 CFR 9904.417-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.417-40 Fundamental requirement. The cost of money...
48 CFR 9904.416-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.416-40 Fundamental requirement. (a) The amount of...
48 CFR 9904.408-40 - Fundamental requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirement..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.408-40 Fundamental requirement. (a) The costs of...
48 CFR 9904.418-40 - Fundamental requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fundamental requirements..., OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.418-40 Fundamental requirements. (a) A business unit...
48 CFR 2901.603-72 - Administrative procurement management reviews.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Authority, and Responsibilities 2901.603-72 Administrative procurement management reviews. (a) The Senior..., policies, procedures and applicable directives. The reviews are to emphasize the development and... quality reviews and assessment techniques. This system is required to: (1) Evaluate the effectiveness and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.417-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.417-20 Purpose. The purpose of this Cost Accounting Standard is to...
Code of Federal Regulations, 2010 CFR
2010-10-01
... measurement and cost assignment. (b) This Cost Accounting Standard is not intended to cover the use of pre... Section 9904.407-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.415-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.415-20 Purpose. (a) The purpose of this Standard 9904.415 is to...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.414-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.414-20 Purpose. The purpose of this Cost Accounting Standard is to...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.408-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.408-20 Purpose. The purpose of this Standard is to improve, and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.406-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.406-20 Purpose. The purpose of this Cost Accounting Standard is to...
41 CFR 101-26.100-2 - Request for waivers.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...) (Federal Supply Schedule items), shall be submitted to the Commissioner, Federal Supply Service (F...) The quantity required. (If demand is recurrent, nonrecurrent, or unpredictable, so state.) (4) The...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.412-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.412-20 Purpose. (a) The purpose of this Standard 9904.412 is to...
48 CFR 19.402 - Small Business Administration procurement center representatives.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Small Business... FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation With the Small Business Administration 19.402 Small Business Administration procurement center representatives. (a)(1) The...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.409-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.409-20 Purpose. The purpose of this Standard is to provide criteria...
48 CFR 9904.403-50 - Techniques for application.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... 9904.403-50 Section 9904.403-50 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.403-50 Techniques for application. (a)(1) Separate...
48 CFR 9904.403-63 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-63 Section 9904.403-63 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.403-63 Effective date. This Standard is effective as of...
48 CFR 9904.408-63 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-63 Section 9904.408-63 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.408-63 Effective date. This Standard is effective as of...
48 CFR 9904.401-63 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-63 Section 9904.401-63 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401-63 Effective date. This Standard is effective as of...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.402-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.402-20 Purpose. The purpose of this standard is to require that...
48 CFR 9904.407-63 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-63 Section 9904.407-63 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.407-63 Effective date. This Standard is effective as of...
48 CFR 9904.405-63 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-63 Section 9904.405-63 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.405-63 Effective date. This Standard is effective as of...
48 CFR 9904.402-63 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-63 Section 9904.402-63 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.402-63 Effective date. This Standard is effective as of...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.410-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.410-20 Purpose. The purpose of this Cost Accounting Standard is to...
48 CFR 9904.406-63 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-63 Section 9904.406-63 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.406-63 Effective date. This Standard is effective as of...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.403-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.403-20 Purpose. (a) The purpose of this Cost Accounting Standard is...
48 CFR 9904.401-50 - Techniques for application.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... 9904.401-50 Section 9904.401-50 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401-50 Techniques for application. (a) The standard...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.401-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401-20 Purpose. The purpose of this Cost Accounting Standard is to...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9904.405-20 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.405-20 Purpose. (a) The purpose of this Cost Accounting Standard is...
48 CFR 19.402 - Small Business Administration procurement center representatives.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Small Business... FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation With the Small Business Administration 19.402 Small Business Administration procurement center representatives. (a)(1) The...
48 CFR 19.402 - Small Business Administration procurement center representatives.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Small Business... FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation With the Small Business Administration 19.402 Small Business Administration procurement center representatives. (a)(1) The...
48 CFR 19.402 - Small Business Administration procurement center representatives.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Small Business... FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation With the Small Business Administration 19.402 Small Business Administration procurement center representatives. (a)(1) The...
48 CFR 19.402 - Small Business Administration procurement center representatives.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Small Business... FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation With the Small Business Administration 19.402 Small Business Administration procurement center representatives. (a)(1) The...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 9903.201-6 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING... remain in compliance. (2) Required change means a change in cost accounting practice that a contractor is...
Code of Federal Regulations, 2010 CFR
2010-10-01
... the applicability of the Cost Accounting Standards for a contract or subcontract with a value of less... 9903.201-5 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS...
Joint Tactical Radio System Handheld, Manpack, and Small Form Fit Radios (JTRS HMS)
2013-12-01
requisitions through the Standard Army Supply System ( SASS ). All radios procured under the Full Rate Production (FRP) phase that become unserviceable...will be turned-in to TYAD through the SASS . Radios will be returned to the original equipment manufacturer vendor for warranty repair, or replacement...procure sustainment spares to replace unserviceable radios and ancillary items requisitioned through SASS , operations, maintenance, training
Body mass index and employment-based health insurance.
Fong, Ronald L; Franks, Peter
2008-05-09
Obese workers incur greater health care costs than normal weight workers. Possibly viewed by employers as an increased financial risk, they may be at a disadvantage in procuring employment that provides health insurance. This study aims to evaluate the association between body mass index [BMI, weight in kilograms divided by the square of height in meters] of employees and their likelihood of holding jobs that include employment-based health insurance [EBHI]. We used the 2004 Household Components of the nationally representative Medical Expenditure Panel Survey. We utilized logistic regression models with provision of EBHI as the dependent variable in this descriptive analysis. The key independent variable was BMI, with adjustments for the domains of demographics, social-economic status, workplace/job characteristics, and health behavior/status. BMI was classified as normal weight (18.5-24.9), overweight (25.0-29.9), or obese (> or = 30.0). There were 11,833 eligible respondents in the analysis. Among employed adults, obese workers [adjusted probability (AP) = 0.62, (0.60, 0.65)] (P = 0.005) were more likely to be employed in jobs with EBHI than their normal weight counterparts [AP = 0.57, (0.55, 0.60)]. Overweight workers were also more likely to hold jobs with EBHI than normal weight workers, but the difference did not reach statistical significance [AP = 0.61 (0.58, 0.63)] (P = 0.052). There were no interaction effects between BMI and gender or age. In this nationally representative sample, we detected an association between workers' increasing BMI and their likelihood of being employed in positions that include EBHI. These findings suggest that obese workers are more likely to have EBHI than other workers.
A novel scoring system for predicting adherent placenta in women with placenta previa.
Tanimura, Kenji; Morizane, Mayumi; Deguchi, Masashi; Ebina, Yasuhiko; Tanaka, Utaru; Ueno, Yoshiko; Kitajima, Kazuhiro; Maeda, Tetsuo; Sugimura, Kazuro; Yamada, Hideto
2018-04-01
Placenta previa (PP) is one of the most significant risk factors for adherent placenta (AP). The aim of this study was to evaluate the diagnostic efficacy of a novel scoring system for predicting AP in pregnant women with PP. This prospective cohort study enrolled 175 women with PP. The placenta previa with adherent placenta score (PPAP score) is composed of 2 categories: (1) past history of cesarean section (CS), surgical abortion, and/or uterine surgery; and (2) ultrasonography and magnetic resonance imaging findings. Each category is graded as 0, 1, 2, or 4 points, yielding a total score between 0 and 24. When women with PP had PPAP score ≥8, they were considered to be at a high risk for AP and received placement of preoperative internal iliac artery occlusion balloon catheters. If they were found to have AP during CS, they underwent hysterectomy or placenta removal using advanced bipolar with balloon catheter occlusion. The predictive accuracy of PPAP score was evaluated. In total, 23 of the 175 women with PP were diagnosed as having AP, histopathologically or clinically. Twenty-one of 24 women with PPAP score ≥8 had AP, whereas two of 151 women with PPAP score <8 had AP. The scoring system yielded 91.3% sensitivity, 98.0% specificity, 87.5% positive predictive value, and 98.7% negative predictive value for predicting AP in women with PP. This prospective study demonstrated that PPAP scoring system may be useful for predicting AP in women with PP. Copyright © 2018 Elsevier Ltd. All rights reserved.
Challenges in developing e-government for good governance in North Sumatra
NASA Astrophysics Data System (ADS)
Siahaan, AY
2017-01-01
E-government as one form of public administration reform in Indonesia is increasingly related to the pursuance of good governance. This paper examines the relationship between of e-government and good governance by utilizing the case study design on the implementation of e-procurement in North Sumatra. It reveals centrality of local politics and business culture in understanding resistances of both local government officials and local business which creates loopholes’ for the practice of ‘bad governance’ in all phases of e-procurement in North Sumatra province. Data transparency does not equate and guarantee the realization of good governance. Public knowledge and understanding on government decision making processes and accountability (process and policy transparency) are central to achieve good governance through e-procurement. E-procurement system does not automatically change organizational and working culture of the implementers and suppliers. This paper provides insight to the attitude and the perception of private sector engage in e-procurement towards government in implementing e-government. Resistance, digital divide and local politics interrelatedly obstruct the realization of pursuing good governance through e-procurement.
41 CFR 101-26.607-2 - Adjustments.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Adjustments. 101-26.607-2 Section 101-26.607-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM...
41 CFR 101-26.308 - Obtaining filing cabinets.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Obtaining filing cabinets. 101-26.308 Section 101-26.308 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...
41 CFR 101-26.501-8 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true [Reserved] 101-26.501-8 Section 101-26.501-8 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM...
41 CFR 101-26.506-2 - Limitations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Limitations. 101-26.506-2 Section 101-26.506-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM...
41 CFR 101-26.509 - Tabulating machine cards.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Tabulating machine cards. 101-26.509 Section 101-26.509 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true [Reserved] 101-26.504 Section 101-26.504 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA...
41 CFR 101-26.607-1 - Payments.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Payments. 101-26.607-1 Section 101-26.607-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true [Reserved] 101-26.601 Section 101-26.601 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.6...
41 CFR 101-26.301 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Applicability. 101-26.301 Section 101-26.301 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3...
41 CFR 101-26.703 - Marginally punched continuous forms.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Marginally punched continuous forms. 101-26.703 Section 101-26.703 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.418-20... FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.418-20 Purpose. The purpose of this Cost Accounting Standard is to...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Purpose. 9904.420-20... FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.420-20 Purpose. The purpose of this Cost Accounting Standard is to...
41 CFR 101-26.300 - Scope of subpart.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Scope of subpart. 101-26.300 Section 101-26.300 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...
41 CFR 101-26.4900 - Scope of subpart.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Scope of subpart. 101-26.4900 Section 101-26.4900 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...
41 CFR 101-26.300 - Scope of subpart.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Scope of subpart. 101-26.300 Section 101-26.300 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...
41 CFR 101-26.300 - Scope of subpart.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Scope of subpart. 101-26.300 Section 101-26.300 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...
41 CFR 101-26.4900 - Scope of subpart.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Scope of subpart. 101-26.4900 Section 101-26.4900 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...
41 CFR 101-26.4900 - Scope of subpart.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Scope of subpart. 101-26.4900 Section 101-26.4900 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...
ERIC Educational Resources Information Center
Grush, Mary
2009-01-01
There is no doubt that eProcurement technology has turned cumbersome paper-based processes into highly connected online systems. The most basic parameters of eProcurement range from shopping for or sourcing goods, to creating purchase requisitions and getting them approved, to placing orders with suppliers, to receiving invoices--all…
41 CFR 105-72.500 - Purpose of procurement standards.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Purpose of procurement standards. 105-72.500 Section 105-72.500 Public Contracts and Property Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional Offices-General Services...
41 CFR 101-26.310 - Ordering errors.
Code of Federal Regulations, 2014 CFR
2014-07-01
....310 Section 101-26.310 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND... provisions of this § 101-26.310, GSA may authorize agencies to return for credit material that has been...
41 CFR 101-26.301 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Applicability. 101-26.301 Section 101-26.301 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3...
48 CFR 9904.404-50 - Techniques for application.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... 9904.404-50 Section 9904.404-50 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404-50 Techniques for application. (a) The cost to...
48 CFR 9904.405-50 - Techniques for application.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... 9904.405-50 Section 9904.405-50 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.405-50 Techniques for application. (a) The detail and...
48 CFR 9904.406-50 - Techniques for application.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... 9904.406-50 Section 9904.406-50 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.406-50 Techniques for application. (a) The cost of an...
41 CFR 101-26.802 - Exclusions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Exclusions. 101-26.802 Section 101-26.802 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.8...
41 CFR 101-26.802 - Exclusions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Exclusions. 101-26.802 Section 101-26.802 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.8...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The Procurement and Assistance Data System (PADS) provides a mechanism for collecting, assembling, organizing, and presenting acquisition and assistance data for the Department of Energy (DOE). This handbook and associated documents establish a uniform system to report acquisition/assistance data to PADS for the collection, processing, and dissemination of official statistical data on the Department`s acquisition and assistance actions. The data provides, based on information available at the time of request, a basis for any recurring and special reports to the senior procurement executive, Congress, General Accounting Office (GAO), Federal executive agencies, Office of management and Budget (OMB), and the generalmore » public. It provides information for measuring and assessing the extent to which small business firms and small disadvantages business enterprises are sharing in DOE placement, and for other acquisition and assistance policy and management control purposes. The Handbook for the Preparation of the Individual Procurement Action Report (IPAR) has been designed in two sections; Procurement and Financial Assistance to support the individual forms.« less
Biagianti, Bruno; Fisher, Melissa; Neilands, Torsten B.; Loewy, Rachel; Vinogradov, Sophia
2016-01-01
BACKGROUND Individuals with schizophrenia who engage in targeted cognitive training (TCT) of the auditory system show generalized cognitive improvements. The high degree of variability in cognitive gains maybe due to individual differences in the level of engagement of the underlying neural system target. METHODS 131 individuals with schizophrenia underwent 40 hours of TCT. We identified target engagement of auditory system processing efficiency by modeling subject-specific trajectories of auditory processing speed (APS) over time. Lowess analysis, mixed models repeated measures analysis, and latent growth curve modeling were used to examine whether APS trajectories were moderated by age and illness duration, and mediated improvements in cognitive outcome measures. RESULTS We observed signifcant improvements in APS from baseline to 20 hours of training (initial change), followed by a flat APS trajectory (plateau) at subsequent time-points. Participants showed inter-individual variability in the steepness of the initial APS change and in the APS plateau achieved and sustained between 20–40 hours. We found that participants who achieved the fastest APS plateau, showed the greatest transfer effects to untrained cognitive domains. CONCLUSIONS There is a significant association between an individual's ability to generate and sustain auditory processing efficiency and their degree of cognitive improvement after TCT, independent of baseline neurocognition. APS plateau may therefore represent a behavioral measure of target engagement mediating treatment response. Future studies should examine the optimal plateau of auditory processing efficiency required to induce significant cognitive improvements, in the context of inter-individual differences in neural plasticity and sensory system efficiency that characterize schizophrenia. PMID:27617637
Fagnani, D; Franchi, R; Porta, C; Pugliese, P; Borgonovo, K; Bertolini, A; Duro, M; Ardizzoia, A; Filipazzi, V; Isa, L; Vergani, C; Milani, M; Cimminiello, C
2007-03-01
Recent guidelines do not recommend antithrombotic prophylaxis (AP) to prevent catheter-related thrombosis in cancer patients with a central line. This study assessed the management of central lines in cancer patients, current attitude towards AP, catheter-related and systemic venous thromboses, and survival. Of 1410 patients enrolled, 1390 were seen at least once in the 6-month median follow-up. Continuous AP, mainly low-dose warfarin, was given to 451 (32.4%); they were older, with a more frequent history of venous thromboembolism (VTE), and more advanced cancer. There was no difference in catheter-related thrombosis in patients given AP or not (2.8% and 2.2%, odds ratio 1.29, 95% confidence interval 0.64-2.6). The median time to first catheter-related complication was 120 days. Systemic VTE including deep and superficial thromboses and pulmonary embolism, were less frequent with AP (4% versus 8.2%, P = 0.005). Mortality was also lower (25% versus 44%, P = 0.0001). Multiple logistic regression analysis found only advanced cancer and no AP significantly associated with mortality. No major bleeding was recorded with AP. Current AP schedules do not appear to prevent catheter-related thrombosis. Systemic VTE and mortality, however, appeared lower after prophylaxis.
Pintado, María-Consuelo; Trascasa, María; Arenillas, Cristina; de Zárate, Yaiza Ortiz; Pardo, Ana; Blandino Ortiz, Aaron; de Pablo, Raúl
2016-05-01
The updated Atlanta Classification of acute pancreatitis (AP) in adults defined three levels of severity according to the presence of local and/or systemic complications and presence and length of organ failure. No study focused on complications and mortality of patients with moderately severe AP admitted to intensive care unit (ICU). The main aim of this study is to describe the complications developed and outcomes of these patients and compare them to those with severe AP. Prospective, observational study. We included patients with acute moderately severe or severe AP admitted in a medical-surgical ICU during 5years. We collected demographic data, admission criteria, pancreatitis etiology, severity of illness, presence of organ failure, local and systemic complications, ICU length of stay, and mortality. Fifty-six patients were included: 12 with moderately severe AP and 44 with severe. All patients developed some kind of complications without differences on complications rate between moderately severe or severe AP. All the patients present non-infectious systemic complications, mainly acute respiratory failure and hemodynamic failure. 82.1% had an infectious complication, mainly non-pancreatic infection (66.7% on moderately severe AP vs. 79.5% on severe, p=0.0443). None of the patients with moderately severe AP died during their intensive care unit stay vs. 29.5% with severe AP (p=0.049). Moderately severe AP has a high rate of complications with similar rates to patients with severe AP admitted to ICU. However, their ICU mortality remains very low, which supports the existence of this new group of pancreatitis according to their severity. Copyright © 2016 European Federation of Internal Medicine. Published by Elsevier B.V. All rights reserved.
Uemura, Kazunori; Kawada, Toru; Zheng, Can; Li, Meihua; Sugimachi, Masaru
2017-10-23
Hemodynamic resuscitation in septic shock requires aggressive fluid replacement and appropriate use of vasopressors to optimize arterial pressure (AP) and cardiac output (CO). Because responses to these drugs vary between patients and within patient over time, strict monitoring of patient condition and repetitive adjustment of drug dose are required. This task is time and labor consuming, and is associated with poor adherence to resuscitation guidelines. To overcome this issue, we developed a computer-controlled closed-loop drug infusion system for automated hemodynamic resuscitation in septic shock, and evaluated the performance of the system in a canine model of endotoxin shock. Our system monitors AP, CO and central venous pressure, and computes arterial resistance (R), stressed blood volume (V) and Frank-Starling slope of left ventricle (S). The system controls R with noradrenaline (NA), and V with Ringer's acetate solution (RiA), thereby controlling AP and CO. In 4 dogs, AP and CO were measured invasively. In another 4 dogs, AP and CO were measured less invasively using clinically acceptable modalities, aiming to make the system clinically feasible. In all 8 dogs, endotoxin shock was induced by injecting Escherichia coli lipopolysaccharide, which significantly decreased AP from 95 (91-108) to 43 (39-45) mmHg, and CO from 112 (104-142) to 62 (51-73) ml·min -1 ·kg -1 . The system was then connected to the dogs, and activated. System performance was observed over a period of 4 h. Our system immediately started infusions of NA and RiA. Within 40 min, RiA increased V to target level, and NA maintained R at target level, while S was concomitantly increased. These resulted in restoration of AP to 70 (69-71) mmHg and CO to 130 (125-138) ml·min -1 ·kg -1 . Median of absolute performance error, an index of precision of control, was small in AP [2.5 (2.1-4.5) %] and CO [2.4 (1.4-5.5) %], which were not increased even when the variables were measured less invasively. In a canine model of endotoxin shock, our system automatically improved and maintained AP and CO at their target values with small performance error. Our system is potentially an attractive clinical tool for rescuing patients with septic shock.
Rashid, Nazia; Sharma, Puza P; Scott, Ronald D; Lin, Kathy J; Toth, Peter P
2016-01-01
To evaluate patient characteristics, treatment patterns, comorbidities, and risk factors associated with the development of acute pancreatitis (AP) in patients with severe hypertriglyceridemia (HTG) in an integrated health care delivery system. We identified a retrospective cohort of severe HTG patients with a fasting triglyceride level ≥ 1000 mg/dL during January 1, 2007 to June 30, 2013 (index date) in an integrated health care delivery system. Patients were aged ≥18 years on index date and had 12 months of continuous membership and drug eligibility before the index date and during postindex including index date. Baseline patient characteristics, comorbidities, and risk factors were evaluated during 12-month preindex. Outcomes such as development of AP, treatment patterns, adherence to index therapy, and change in triglyceride (TG) laboratory levels were evaluated during postindex. Descriptive statistics were used to identify differences between patients developing AP vs no development of AP. A stepwise multivariate logistic regression and backward elimination method were used to assess statistically significant predictive factors associated with development of AP vs no AP. We identified 5550 patients with severe HTG, and 5.4% of these patients developed AP during postindex. Patients were mostly male (≥70%) in both groups; however, younger in the AP group (45 years ± 10.6) vs no AP group (50 years ± 11.4) with P value < .0001. The AP group had higher baseline Charslon Comorbidity Index score, alcohol abuse history (42.2%), any pancreatitis history (51.5%), diabetes (47%), and hypertension (55%), vs the no AP group (P values < .05). Patients in the AP group had higher baseline mean TG levels (2148, SD ± 1578) vs the no AP group (1559, SD ± 861), P value < .0001. Over 50% of the patients were prescribed their index therapy by a primary care provider. Predictive factors associated with the development of AP included younger age, alcohol use, and prior history of any pancreatitis, hypertension, renal disease stage 4, and other prescriber specialty. From parameters estimates, for each 100 mg/dL unit of increase in the TG level above 1000 mg/dL, there was a 3 percent increase in risk of developing AP. Patients with severe HTG are at a higher risk of developing AP. A number of comorbidities, risk factors, and baseline TG levels are associated with an increased incidence of AP. Patients with severe HTG are underdiagnosed, undertreated and are nonadherent to their index lipid therapy. There is a need to better define optimal approaches to treating severe HTG so as to reduce the incidence of AP. Economic studies are also needed to evaluate the burden of AP on various health care systems. Copyright © 2016 National Lipid Association. Published by Elsevier Inc. All rights reserved.
Computerized engineering logic for procurement and dedication processes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tulay, M.P.
1996-12-31
This paper summarizes the work performed for designing the system and especially for calculating on-line expected performance and gives some significant results. In an attempt to better meet the needs of operations and maintenance organizations, many nuclear utility procurement engineering groups have simplified their procedures, developed on-line tools for performing the specification of replacement items, and developed relational databases containing part-level information necessary to automate the procurement process. Although these improvements have helped to reduce the engineering necessary to properly specify and accept/dedicate items for nuclear safety-related applications, a number of utilities have recognized that additional long-term savings can bemore » realized by integrating a computerized logic to assist technical procurement engineering personnel.« less
1987-01-01
NAME OF FUNDING/SPONSORING 8b. OFFICE SYMBOL 9 . PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER ORGANIZATION (If applicable) Bc. ADDRESS (City, State...8217.io 000 0 00 01: 4 ,4.100000000000000000 4 10 20 ZO 000Q cc0 Z0 0 ’ 14 C,4-J0000000000000000000 9 < ɜ "ə 4< "ɜ ".x4 In4 L) 444 0 < -J.0 0 KO:x Z (D...o( .i.- 04M 5- 3I- ap 3- (V) 00) 40 0- 9 ) m .v-C 1I 0 0 0 0 N N N N N N MOO< 1 l -4-4O~ 0.-I -4 0N 0 (.-L4W-4 0-N D -N 0-NI <I v-4- oo- 4- - "- p ᝰ
Code of Federal Regulations, 2010 CFR
2010-10-01
... Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.420 Accounting for independent research and development costs and bid and proposal costs. ...
41 CFR 101-26.506-5 - Reimbursement for services.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Reimbursement for services. 101-26.506-5 Section 101-26.506-5 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...
41 CFR 101-26.607-3 - Emergency requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Emergency requirements. 101-26.607-3 Section 101-26.607-3 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...
41 CFR 101-26.508-3 - Consolidation of requisitions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Consolidation of requisitions. 101-26.508-3 Section 101-26.508-3 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...
41 CFR 101-26.303 - Out-of-stock items.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Out-of-stock items. 101-26.303 Section 101-26.303 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...
41 CFR 101-26.305 - Submission of orders to GSA.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Submission of orders to GSA. 101-26.305 Section 101-26.305 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...
41 CFR 101-26.509-3 - Consolidation of requisitions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Consolidation of requisitions. 101-26.509-3 Section 101-26.509-3 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...
41 CFR 101-26.500 - Scope and applicability of subpart.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Scope and applicability of subpart. 101-26.500 Section 101-26.500 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...
75 FR 63695 - Designation of Biobased Items for Federal Procurement
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-18
... manufacturing in rural communities; and to enhance the Nation's energy security by substituting biobased... items used in products or systems designed or procured for combat or combat-related missions, which will... least part of its environmental information responsibilities. The BEES tool is designed to evaluate...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Policy. 17.703 Section 17... Behalf of the Department of Defense 17.703 Policy. (a) A DoD acquisition official may request a... applicable procurement requirements if the procurement policies, procedures, and internal controls of the...
48 CFR 9904.403 - Allocation of home office expenses to segments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... expenses to segments. 9904.403 Section 9904.403 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.403 Allocation of home office expenses to...
48 CFR 9904.409 - Cost accounting standard-depreciation of tangible capital assets.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard... ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.409 Cost accounting standard...
48 CFR 9904.410-50 - Techniques for application.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... 9904.410-50 Section 9904.410-50 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.410-50 Techniques for application. (a) G&A expenses of a...
A case study : Chart II software upgrade, using a design competition to procure ITS software
DOT National Transportation Integrated Search
2000-03-01
This is one of a series of case studies that examine procurement approaches used to deliver Intelligent Transportation System (ITS) projects. The purpose of these reports is to provide examples of successful strategies that have been used to overcome...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-24
... Development or Prototype Units (DFARS Case 2009-D034) AGENCY: Defense Acquisition Regulations System... the procurement of prototype units. The DFARS implementation places specific limits, in accordance... components or the procurement of prototype units. IV. Paperwork Reduction Act The Paperwork Reduction Act...
User evaluation of photovoltaic-powered vaccine refrigerator/freezer systems
NASA Technical Reports Server (NTRS)
Ratajczak, Anthony F.
1987-01-01
The NASA Lewis Research Center has concluded a project to develop and field test photovoltaic-powered refrigerator/freezers for vaccine storage in remote areas of developing countries. As a conclusion to this project, questionnaires were sent to the in-country administrators for each test site probing user acceptance of the systems and attitudes regarding procurement of additional systems. Responses indicate that the systems had a positive effect on the local communities, that they made a positive impression on the local health authorities, and that system cost and scarcity of funds are the major barriers to procurements of additional systems.
User evaluation of photovoltaic-powered vaccine refrigerator/freezer systems
NASA Astrophysics Data System (ADS)
Ratajczak, Anthony F.
1987-03-01
The NASA Lewis Research Center has concluded a project to develop and field test photovoltaic-powered refrigerator/freezers for vaccine storage in remote areas of developing countries. As a conclusion to this project, questionnaires were sent to the in-country administrators for each test site probing user acceptance of the systems and attitudes regarding procurement of additional systems. Responses indicate that the systems had a positive effect on the local communities, that they made a positive impression on the local health authorities, and that system cost and scarcity of funds are the major barriers to procurements of additional systems.
Lazewska, D; Guranowski, A
1990-01-01
Synthesis of Sp and Rp diastereomers of Ap4A alpha S has been characterized in two enzymatic systems, the lysyl-tRNA synthetase from Escherichia coli and the Ap4A alpha, beta-phosphorylase from Saccharomyces cerevisiae. The synthetase was able to use both (Sp)ATP alpha S and (Rp)ATP alpha S as acceptors of adenylate thus yielding corresponding monothioanalogues of Ap4A,(Sp) Ap4A alpha S and (Rp)Ap4A alpha S. No dithiophosphate analogue was formed. Relative synthetase velocities of the formation of Ap4A,(Sp) Ap4A alpha S and (Rp)Ap4A alpha S were 1:0.38:0.15, and the computed Km values for (Sp)ATP alpha S and (Rp)ATP alpha S were 0.48 and 1.34 mM, respectively. The yeast Ap4A phosphorylase synthesized (Sp)Ap4A alpha S and (Rp)Ap4A alpha S using adenosine 5'-phosphosulfate (APS) as source of adenylate. The adenylate was accepted by corresponding thioanalogues of ATP. In that system, relative velocities of Ap4A, (Sp)Ap4A alpha S and (Rp)Ap4A alpha S formation were 1:0.15:0.60. The two isomeric phosphorothioate analogues of Ap4A were tested as substrates for the following specific Ap4A-degrading enzymes: (asymmetrical) Ap4A hydrolase (EC 3.6.1.17) from yellow lupin (Lupinus luteus) seeds hydrolyzed each of the analogues to AMP and the corresponding isomer of ATP alpha S; (symmetrical) Ap4A hydrolase (EC 3.6.1.41) from E. coli produced ADP and the corresponding diastereomer of ADP alpha S; and Ap4A phosphorylase (EC 2.7.7.53) from S. cerevisiae cleaved the Rp isomer only at the unmodified end yielding ADP and (Rp)ATP alpha S whereas the Sp isomer was degraded non-specifically yielding a mixture of ADP, (Sp)ADP alpha S, ATP and (Sp)ATP alpha S. For all the Ap4A-degrading enzymes, the Rp isomer of Ap4A alpha S appeared to be a better substrate than its Sp counterpart; stereoselectivity of the three enzymes for the Ap4A alpha S diastereomers is 51, 6 and 2.5, respectively. Basic kinetic parameters of the degradation reactions are presented and structural requirements of the Ap4A-metabolizing enzymes with respect to the potential substrates modified at the Ap4A-P alpha are discussed. PMID:2172926
Management systems research study
NASA Technical Reports Server (NTRS)
Bruno, A. V.
1975-01-01
The development of a Monte Carlo simulation of procurement activities at the NASA Ames Research Center is described. Data cover: simulation of the procurement cycle, construction of a performance evaluation model, examination of employee development, procedures and review of evaluation criteria for divisional and individual performance evaluation. Determination of the influences and apparent impact of contract type and structure and development of a management control system for planning and controlling manpower requirements.
Azzopardi-Muscat, Natasha; Schroder-Bäck, Peter; Brand, Helmut
2017-01-01
The Joint Procurement Agreement (JPA) is an innovative instrument for multi-country procurement of medical countermeasures against cross-border health threats. This paper aims to assess its potential performance. A literature review was conducted to identify key features of successful joint procurement programmes. Documentary analysis and a key informants' interview were carried out to analyse the European Union (EU) JPA. Ownership, equity, transparency, stable central financing, standardisation, flexibility and gradual development were identified as important prerequisites for successful establishment of multi-country joint procurement programmes in the literature while security of supply, favourable prices, reduction of operational costs and administrative burden and creation of professional expert networks were identified as desirable outcomes. The EU JPA appears to fulfil the criteria of ownership, transparency, equity, flexibility and gradual development. Standardisation is only partly fulfilled and central EU level financing is not provided. Security of supply is an important outcome for all EU Member States (MS). Price savings, reduction in administrative burden and creation of professional networks may be particularly attractive for the smaller MS. The JPA has the potential to increase health system collaboration and efficiency at EU level provided that the incentives for sustained commitment of larger MS are sufficiently attractive.
One animal among many: Veterinarians in the global community
Waltner-Toews, David
1989-01-01
Evidence from chemistry, physics, the biological sciences and the earth sciences is now accumulating that the earth functions as a living organism, with all the implications of circulatory and homeostatic systems which that implies. As veterinarians, we are more than simply handmaidens to agribusiness, the academic, pet and food industries, or government regulatory agencies. While our jobs may be specific, dependent, and circumscribed, our vocation can be nothing less than the health-care of all animal life — and hence by direct implication, the care of the earth, as a living organism, itself. Imagesp13-ap14-ap15-ap16-ap17-ap18-ap19-ap20-ap20-b PMID:17423204
AP reclamation and reuse in RSRM propellant
NASA Technical Reports Server (NTRS)
Miks, Kathryn F.; Harris, Stacey A.
1995-01-01
A solid propellant ingredient reclamation pilot plant has been evaluated at the Strategic Operations of Thiokol Corporation, located in Brigham City, Utah. The plant produces AP wet cake (95 percent AP, 5 percent water) for recycling at AP vendors. AP has been obtained from two standard propellant binder systems (PBAN and HTPB). Analytical work conducted at Thiokol indicates that the vendor-recrystallized AP meets Space Shuttle propellant specification requirements. Thiokol has processed 1-, 5-, and 600-gallon propellant mixes with the recrystallized AP. Processing, cast, cure, ballistic, mechanical, and safety properties have been evaluated. Phillips Laboratory static-test-fired 70-pound and 800-pound BATES motors. The data indicate that propellant processed with reclaimed AP has nominal properties.
Vascularized Composite Allografts: Procurement, Allocation, and Implementation.
Rahmel, Axel
Vascularized composite allotransplantation is a continuously evolving area of modern transplant medicine. Recently, vascularized composite allografts (VCAs) have been formally classified as 'organs'. In this review, key aspects of VCA procurement are discussed, with a special focus on interaction with the procurement of classical solid organs. In addition, options for a matching and allocation system that ensures VCA donor organs are allocated to the best-suited recipients are looked at. Finally, the different steps needed to promote VCA transplantation in society in general and in the medical community in particular are highlighted.
41 CFR 101-26.000 - Scope of part.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Scope of part. 101-26.000 Section 101-26.000 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM § 101-26...
41 CFR 101-26.501-4 - Submission of orders.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Submission of orders. 101-26.501-4 Section 101-26.501-4 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...
41 CFR 109-26.501-50 - Authority and allocations for the acquisition of passenger motor vehicles.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Authority and...
41 CFR 101-26.506-3 - Submission of requests.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Submission of requests. 101-26.506-3 Section 101-26.506-3 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-08
... elements of the Department of Homeland Security concerned with the analysis of intelligence information... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 217 RIN 0750-AG67 Defense Federal Acquisition Regulation Supplement; Limitations on Procurements With Non-Defense Agencies (DFARS...
78 FR 45182 - Clarification of Sourcing Requirements for the Procurement List
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-26
...) 4140.1-R, DoD Supply Chain Materiel Management Regulation, the AbilityOne Program is designating the... Defense and the General Services Administration Governing Supply Management Relationships Under the National Supply System provides DLA the authority to procure and supply certain assigned products for the...
Code of Federal Regulations, 2010 CFR
2010-04-01
... Opportunity: Employment Practices. IV. Equal Opportunity: Selection of Subcontractors, Procurement of... pay or other forms of compensation; and selection of training, including apprenticeship. The... selection of subcontractors, procurement of materials, and leasing of equipment. During the performance of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-28
... multi-agency contracts, or basic ordering agreements. The proposed text also directs that a... agreements, or blanket purchase agreements. As a result of the proposed rule, new awards under the AbilityOne... Part 204 Government procurement. Manuel Quinones, Editor, Defense Acquisition Regulations System...
DOT National Transportation Integrated Search
1997-04-01
This report presents the results of research on procurement-related legal and non-technical issues which may be constraining the deployment of Intelligent Transportation Systems (ITS). The reports focus is on State and local procurement practices ...
Code of Federal Regulations, 2010 CFR
2010-10-01
... unit general and administrative expenses to final cost objectives. 9904.410 Section 9904.410 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING...
48 CFR 926.7004 - Size standard for Energy Policy Act procurements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Size standard for Energy... ENERGY SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Implementation of Section 3021 of the Energy Policy Act of 1992 926.7004 Size standard for Energy Policy Act procurements. The size standard for...
48 CFR 926.7004 - Size standard for Energy Policy Act procurements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Size standard for Energy... ENERGY SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Implementation of Section 3021 of the Energy Policy Act of 1992 926.7004 Size standard for Energy Policy Act procurements. The size standard for...
48 CFR 926.7004 - Size standard for Energy Policy Act procurements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Size standard for Energy... ENERGY SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Implementation of Section 3021 of the Energy Policy Act of 1992 926.7004 Size standard for Energy Policy Act procurements. The size standard for...
48 CFR 926.7004 - Size standard for Energy Policy Act procurements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Size standard for Energy... ENERGY SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Implementation of Section 3021 of the Energy Policy Act of 1992 926.7004 Size standard for Energy Policy Act procurements. The size standard for...
29 CFR 95.44 - Procurement procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... 29 Labor 1 2014-07-01 2013-07-01 true Procurement procedures. 95.44 Section 95.44 Labor Office of the Secretary of Labor GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND...
29 CFR 95.44 - Procurement procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... 29 Labor 1 2013-07-01 2013-07-01 false Procurement procedures. 95.44 Section 95.44 Labor Office of the Secretary of Labor GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND...
29 CFR 95.44 - Procurement procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... feasible, of products and services dimensioned in the metric system of measurement. (vi) Preference, to the... 29 Labor 1 2012-07-01 2012-07-01 false Procurement procedures. 95.44 Section 95.44 Labor Office of the Secretary of Labor GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND...
76 FR 5389 - Agency Information Collection Activities: Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-31
...) and in carrying out other statutory responsibilities. Information is needed to match donor organs with... Act of 1995: Proposed Project: Data System for Organ Procurement and Transplantation Network (42 CFR Part 121, OMB No. 0915-0184)--[Extension] The operation of the Organ Procurement and Transplantation...
75 FR 63187 - Agency Information Collection Activities: Proposed Collection: Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-14
.... Information is needed to match donor organs with recipients, to monitor compliance of member organizations... techniques or other forms of information technology. Proposed Project: Data System for Organ Procurement and Transplantation Network (42 CFR Part 121, OMB No. 0915-0184): Extension The operation of the Organ Procurement and...
Application of Kanban System on a hospital pharmacy.
Mitka, Eleftheria
2015-01-01
This is a brief overview of principles, views and methods, of the Kanban System for the pharmacy of a general hospital. The main goal is the reduction of stores managed by the pharmacy, as well as improvement of the mode of operation. Solutions to problems, such as inadequate storage space, the delay in serving patients or clinics and the expiration of various pharmaceutical formulations, stored for so long time, are provided. The philosophy behind the Kanban procurement System and specifically its applicability to a pharmacy underperforming in terms of efficiency, in Greece, are described. Based on the analysis of stock requirement, item stock prices and demand, it is concluded that a significant percentage of the stocked drugs can be procured using the Kanban System. Significant cost savings and operational advantages following the Kanban System will take place. The challenging endeavor is the analysis, design and application of a system that supports the proposed procurement method. Hospital pharmacies in Greece and in other countries that face an economic crisis may largely benefit after using the Kanban System.
Effect of clothing type on validity of air-displacement plethysmography.
King, George A; Fulkerson, Bethany; Evans, Michael J; Moreau, Kerrie L; McLaughlin, James E; Thompson, Dixie L
2006-02-01
The purpose of the study was to evaluate the validity of an air-displacement plethysmography system (AP) within the general population, while wearing (1) a racing-type swimsuit (AP(SS)) and (2) participant's personal undergarments (AP(UG)), against hydrodensitometry (HW). Fifty women and 50 men were measured for body volume, density, and fat percentage by HW and compared with AP(SS) and AP(UG). For women, AP(UG) and AP(SS) were similar, although significant differences (p < 0.001) were observed between AP(UG) and HW and between AP(SS) and HW. For men, there was no significant difference between AP(UG) and HW; however, significant differences (P < or = 0.01) were found between AP(UG) and AP(SS) and between AP(SS) and HW. The small discrepancy in measured values between AP and HW are within the measurement error for the instrumentation and these data support the use of AP for determination of body composition in adults across a wide range of body size (body mass index [BMI] 17.7-35.2 kg.m(-2)) and age (18-57 y). Participants' personal undergarments provide a practical alternative to a spandex swimsuit when measuring body composition by AP in women but not in men.
Auxiliary Propulsion Activities in Support of NASA's Exploration Initiative
NASA Technical Reports Server (NTRS)
Best, Philip J.; Unger, Ronald J.; Waits, David A.
2005-01-01
The Space Launch Initiative (SLI) procurement mechanism NRA8-30 initiated the Auxiliary Propulsion System/Main Propulsion System (APS/MPS) Project in 2001 to address technology gaps and development risks for non-toxic and cryogenic propellants for auxiliary propulsion applications. These applications include reaction control and orbital maneuvering engines, and storage, pressure control, and transfer technologies associated with on-orbit maintenance of cryogens. The project has successfully evolved over several years in response to changing requirements for re-usable launch vehicle technologies, general launch technology improvements, and, most recently, exploration technologies. Lessons learned based on actual hardware performance have also played a part in the project evolution to focus now on those technologies deemed specifically relevant to the Exploration Initiative. Formal relevance reviews held in the spring of 2004 resulted in authority for continuation of the Auxiliary Propulsion Project through Fiscal Year 2005 (FY05), and provided for a direct reporting path to the Exploration Systems Mission Directorate. The tasks determined to be relevant under the project were: continuation of the development, fabrication, and delivery of three 870 lbf thrust prototype LOX/ethanol reaction control engines; the fabrication, assembly, engine integration and testing of the Auxiliary Propulsion Test Bed at White Sands Test Facility; and the completion of FY04 cryogenic fluid management component and subsystem development tasks (mass gauging, pressure control, and liquid acquisition elements). This paper presents an overview of those tasks, their scope, expectations, and results to-date as carried forward into the Exploration Initiative.
Biagianti, Bruno; Fisher, Melissa; Neilands, Torsten B; Loewy, Rachel; Vinogradov, Sophia
2016-11-01
Individuals with schizophrenia who engage in targeted cognitive training (TCT) of the auditory system show generalized cognitive improvements. The high degree of variability in cognitive gains maybe due to individual differences in the level of engagement of the underlying neural system target. 131 individuals with schizophrenia underwent 40 hours of TCT. We identified target engagement of auditory system processing efficiency by modeling subject-specific trajectories of auditory processing speed (APS) over time. Lowess analysis, mixed models repeated measures analysis, and latent growth curve modeling were used to examine whether APS trajectories were moderated by age and illness duration, and mediated improvements in cognitive outcome measures. We observed significant improvements in APS from baseline to 20 hours of training (initial change), followed by a flat APS trajectory (plateau) at subsequent time-points. Participants showed interindividual variability in the steepness of the initial APS change and in the APS plateau achieved and sustained between 20 and 40 hours. We found that participants who achieved the fastest APS plateau, showed the greatest transfer effects to untrained cognitive domains. There is a significant association between an individual's ability to generate and sustain auditory processing efficiency and their degree of cognitive improvement after TCT, independent of baseline neurocognition. APS plateau may therefore represent a behavioral measure of target engagement mediating treatment response. Future studies should examine the optimal plateau of auditory processing efficiency required to induce significant cognitive improvements, in the context of interindividual differences in neural plasticity and sensory system efficiency that characterize schizophrenia. (PsycINFO Database Record (c) 2016 APA, all rights reserved).
Grover, Amit S; Kadiyala, Vivek; Banks, Peter A; Grand, Richard J; Conwell, Darwin L; Lightdale, Jenifer R
2017-01-01
Pediatric patients with acute pancreatitis (AP) may meet criteria at admission for the systemic inflammatory response syndrome (SIRS). Early SIRS in adults with AP is associated with severe disease. Our aim was to evaluate the importance of SIRS in children presenting with AP on various outcomes. This is a retrospective cohort study of children hospitalized with AP at Boston Children's Hospital in 2010. Increased length of stay (LOS) and/or admission to the intensive care unit (ICU) served as the primary outcomes. Statistical analyses of measures studied included the presence of SIRS, demographic, and clinical information present on admission. Fifty encounters, in which AP was the primary admitting diagnosis, were documented. Patients had a median LOS of 4.5 (interquartile range, 2-9) days. Systemic inflammatory response syndrome was present in 22 (44%) of 50 patients at admission. Systemic inflammatory response syndrome at admission was an independent predictor of increased LOS (odds ratio, 7.99; P = 0.045) as well as admission to the ICU (odds ratio, 12.06; P = 0.027). The presence of SIRS criteria on admission serves as a useful and easy-to-calculate predictor of increased LOS and admission to ICU in children with AP.
1984-12-01
model pr, vides a method for communicating a specific training equipment design to the procurement office after A"~- ISD ana lysis has est~blished a...maintenance trainer has been identified. The model provides a method by which a training equipment design can be communicated to the System Project Office...ensure * ase of development of procurement specifications and consistency between different documented designs. A completed application of this maodel
1999-10-01
Technical Report 5-20448 & 5- 20449 Contract No. DAAH01-98-D-R001 Delivery Order No. 34 Microelectronics Status Analysis and Secondary Part...Procureability Assessment of the THAAD Weapon System. (5-20448 & 5- 20449 ) Final Technical Report for Period 21 January 1999 through 30 September 1999...Huntsville Huntsville, AL 35899 5. FUNDING NUMBERS 8. PERFORMING ORGANIZATION REPORT NUMBER 5-20448 & 5- 20449 9. SPONSORING/MONITORING AGENCY
Tactical Utility of Tailored Systems
2015-07-10
create a procurement system to produce materiel at a cost low enough to make equipment disposable. Further cost savings may be realized by upgrading...replacement parts. With the advent of 3-d printing and digital manufacturing, a new part may be procured as easily as scanning a bar code and pressing...9/11 Commission Report “Imagination is not a gift usually associated with bureaucracies. It is therefore crucial to find a way of routinizing, even
Perimeter intrusion detection and assessment system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eaton, M.J.; Jacobs, J.; McGovern, D.E.
1977-11-01
To obtain an effective perimeter intrusion detection system requires careful sensor selection, procurement, and installation. The selection process involves a thorough understanding of the unique site features and how these features affect the performance of each type of sensor. It is necessary to develop procurement specifications to establish acceptable sensor performance limits. Careful explanation and inspection of critical installation dimensions is required during on-site construction. The implementation of these activities at a particular site is discussed.
Warranties in Weapon System Procurement: An Analysis of Practice and Theory.
1987-04-01
MICROCOPY RESOLUTION TEST CHART NATIONAL BUREAU OF SIANDARDS 1963 A fD r ILE GW cm AD-A190 933 IDA PAPER P-2024 WARRANTIES IN WEAPON SYSTEM PROCUREMENT...EPWT Essential Performance Warranty Test FAR Federal Acquisition Regulation GCS Guidance Control Section GLD Ground Laser Locator Designator GS General...Service IDA Institute for Defense Analyses I&L Installations and Logistics IPT Initial Production Test LDR Laser Designator Rangefimder MLDT Mean
Using a Classroom Response System to Improve Multiple-Choice Performance in AP[R] Physics
ERIC Educational Resources Information Center
Bertrand, Peggy
2009-01-01
Participation in rigorous high school courses such as Advanced Placement (AP[R]) Physics increases the likelihood of college success, especially for students who are traditionally underserved. Tackling difficult multiple-choice exams should be part of any AP program because well-constructed multiple-choice questions, such as those on AP exams and…
Bertilsson, Sara; Kalaitzakis, Evangelos
2015-10-01
To assess the use of acute pancreatitis (AP)-associated drugs in patients with AP, the relation between sales of these drugs and the incidence of AP, and the potential impact on AP severity and recurrence. All patients with incident AP between 2003 and 2012, in a well-defined area, were retrospectively identified. Data regarding AP etiology, severity, and recurrence and use of AP-associated drugs were extracted from medical records. Drugs were classified according to an evidence-based classification system. Annual drug sales data were obtained from the Swedish drug administration service. Overall, 1457 cases of incident AP were identified. Acute pancreatitis-associated drug users increased from 32% in 2003 to 51% in 2012, reflecting increasing user rates in the general population. The incidence of AP increased during the study period but was not related to AP-associated drug user rates (P > 0.05). Recurrent AP occurred in 23% but was unrelated to AP-associated drug use (P > 0.05). In logistic regression analysis, after adjustment for comorbidity, AP-associated drug use was not related to AP severity (P > 0.05). Use of AP-associated drugs is increasingly frequent in patients with AP. However, it does not have any major impact on the observed epidemiological changes in occurrence, severity, or recurrence of AP.
NASA Astrophysics Data System (ADS)
Schoolderman, Arnold J.; Roosenboom, Jacques H. J.
2005-06-01
The Engineers Centre of Expertise of the Royal Netherlands Army (RNLA) has conducted a study on countermine in peace operations. This study, finished in 2002, concluded that the final solution to countermine will depend in the first place on better detection of buried low-metal mines, e.g. by direct detection of the explosive components in mines. Until such detection systems are available, intermediate solutions are necessary in order to assure freedom of movement in peace operations. Because countermine operations consist of a number of different activities (area preparation, detection, clearance, etc) and the suitability of the different types of available equipment depends on the scenario, the toolbox concept for countermine equipment was adopted. In 2003 a procurement process was started in order to fill this toolbox with commercial-off-the-shelf and military-off-the-shelf equipment. The paper gives a concise description of the study on countermine operations and the procurement process, and subsequently focuses on the set-up of the tests that were conducted in the framework of the procurement of hand-held mine detection systems, like metal detectors and dual-sensor mine detectors. Programs of requirements for these systems were drawn up, aiming at systems for general use and special purpose systems. Blind tests to check the compliancy to the detection performance requirements were designed and conducted in the short timeframe that was available in the procurement process. These tests are discussed in this paper, including the set-up of the test lanes, the targets used and their depths, and the role of the operator. The tests of the capability of the detectors to discriminate small targets adjacent to large targets were conducted according the guidelines of the CEN Workshop Agreement on metal detector tests. Although the results of the tests are commercially confidential, conclusions and lessons learned from the execution of these tests are presented.
Intestinal Fatty Acid Binding Protein as a Marker of Necrosis and Severity in Acute Pancreatitis.
Kupčinskas, Juozas; Gedgaudas, Rolandas; Hartman, Hannes; Sippola, Tomi; Lindström, Outi; Johnson, Colin D; Regnér, Sara
2018-07-01
The aim of this study was to study intestinal fatty acid binding protein (i-FABP) as a potential biomarker in predicting severity of acute pancreatitis (AP). In a prospective multicenter cohort study, plasma levels of i-FABP were measured in 402 patients with AP. Severity of AP was determined based on the 1992 Atlanta Classification. Admission levels of plasma i-FABP were significantly higher in patients with pancreatic necrosis, in patients having systemic complications, in patients treated invasively, in patients treated in the intensive care unit, in patients with severe AP, and in deceased patients. Plasma i-FABP levels on admission yielded an area under curve (AUC) of 0.732 in discriminating patients with or without pancreatic necrosis and AUC of 0.669 in predicting severe AP. Combination of levels of i-FABP and venous lactate on the day of admission showed higher discriminative power in severe AP-AUC of 0.808. Higher i-FABP levels on admission were associated with pancreatic necrosis, systemic complications, and severe AP. Low levels of i-FABP had a high negative predictive value for pancreatic necrosis and severe AP. Combination of levels of i-FABP and venous lactates on admission were superior to either of markers used alone in predicting severe AP.
Unique Procurement Process Expands Microgrid Research Capabilities at the
competitive procurement process provided comparative research on multiple controller technologies, which will be made publicly available on GitHub. "We always set out to design and build innovative advance the design and performance of controls for future microgrids, and of the larger U.S. power system
48 CFR 9904.407 - Use of standard costs for direct material and direct labor.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.407 Use of standard costs for direct... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Use of standard costs for...
41 CFR 101-26.505 - Office and household furniture and furnishings.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Office and household furniture and furnishings. 101-26.505 Section 101-26.505 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA...
Private University Librarian's Experience on Procurement of Books in Bangladesh
ERIC Educational Resources Information Center
Chowdhury, Muhammad Hossam Haider
2011-01-01
The private universities in Bangladesh are playing an important role in modernizing the higher education system in the country and the role of librarians is also different and challenging. Specially, procuring books and monographs is an exigent function being this lost its demand very quickly. In some cases, titles bear only one semester…
Functions of Adaptor Protein (AP)-3 and AP-1 in Tyrosinase Sorting from Endosomes to MelanosomesD⃞
Theos, Alexander C.; Tenza, Danièle; Martina, José A.; Hurbain, Ilse; Peden, Andrew A.; Sviderskaya, Elena V.; Stewart, Abigail; Robinson, Margaret S.; Bennett, Dorothy C.; Cutler, Daniel F.; Bonifacino, Juan S.; Marks, Michael S.; Raposo, Graça
2005-01-01
Specialized cells exploit adaptor protein complexes for unique post-Golgi sorting events, providing a unique model system to specify adaptor function. Here, we show that AP-3 and AP-1 function independently in sorting of the melanocyte-specific protein tyrosinase from endosomes to the melanosome, a specialized lysosome-related organelle distinguishable from lysosomes. AP-3 and AP-1 localize in melanocytes primarily to clathrin-coated buds on tubular early endosomes near melanosomes. Both adaptors recognize the tyrosinase dileucine-based melanosome sorting signal, and tyrosinase largely colocalizes with each adaptor on endosomes. In AP-3-deficient melanocytes, tyrosinase accumulates inappropriately in vacuolar and multivesicular endosomes. Nevertheless, a substantial fraction still accumulates on melanosomes, concomitant with increased association with endosomal AP-1. Our data indicate that AP-3 and AP-1 function in partially redundant pathways to transfer tyrosinase from distinct endosomal subdomains to melanosomes and that the AP-3 pathway ensures that tyrosinase averts entrapment on internal membranes of forming multivesicular bodies. PMID:16162817
Strategic contracting practices to improve procurement of health commodities
Arney, Leslie; Yadav, Prashant; Miller, Roger; Wilkerson, Taylor
2014-01-01
ABSTRACT Public-sector entities responsible for procurement of essential medicines and health commodities in developing countries often lack the technical capacity to efficiently ensure supply security. Under strict public scrutiny and pressures to be transparent, many agencies continue to use archaic procurement methods and to depend on inflexible forecasts and cumbersome tendering processes. On the basis of semi-structured literature reviews and interviews, we identified framework agreements as a strategic procurement practice used by the U.S. federal government that may also be suitable for global health supply chains. Framework agreements are long-term contracts that provide the terms and conditions under which smaller repeat purchasing orders may be issued for a defined period of time. Such agreements are common in U.S. and United Nations procurement systems and in other developed countries and multilateral organizations. In contrast, framework agreements appear to be seldom used in procurement of health commodities in countries of sub-Saharan Africa. The current practice of floating tenders multiple times a year contributes to long lead times and stock-outs, and it hampers the manufacturer's or supplier's ability to plan and respond to the government's needs. To date, government's use of strategic contracting practices in public procurement of health commodities has not received much attention in most developing countries. It may present an opportunity for substantial improvements in procurement efficiency and commodity availability. Enabling legislation and strengthened technical capacity to develop and manage long-term contracts could facilitate the use of framework contracts in sub-Saharan Africa, with improved supply security and cost savings likely to result. PMID:25276589
Strategic contracting practices to improve procurement of health commodities.
Arney, Leslie; Yadav, Prashant; Miller, Roger; Wilkerson, Taylor
2014-08-01
Public-sector entities responsible for procurement of essential medicines and health commodities in developing countries often lack the technical capacity to efficiently ensure supply security. Under strict public scrutiny and pressures to be transparent, many agencies continue to use archaic procurement methods and to depend on inflexible forecasts and cumbersome tendering processes. On the basis of semi-structured literature reviews and interviews, we identified framework agreements as a strategic procurement practice used by the U.S. federal government that may also be suitable for global health supply chains. Framework agreements are long-term contracts that provide the terms and conditions under which smaller repeat purchasing orders may be issued for a defined period of time. Such agreements are common in U.S. and United Nations procurement systems and in other developed countries and multilateral organizations. In contrast, framework agreements appear to be seldom used in procurement of health commodities in countries of sub-Saharan Africa. The current practice of floating tenders multiple times a year contributes to long lead times and stock-outs, and it hampers the manufacturer's or supplier's ability to plan and respond to the government's needs. To date, government's use of strategic contracting practices in public procurement of health commodities has not received much attention in most developing countries. It may present an opportunity for substantial improvements in procurement efficiency and commodity availability. Enabling legislation and strengthened technical capacity to develop and manage long-term contracts could facilitate the use of framework contracts in sub-Saharan Africa, with improved supply security and cost savings likely to result.
Open system environment procurement
NASA Technical Reports Server (NTRS)
Fisher, Gary
1994-01-01
Relationships between the request for procurement (RFP) process and open system environment (OSE) standards are described. A guide was prepared to help Federal agency personnel overcome problems in writing an adequate statement of work and developing realistic evaluation criteria when transitioning to an OSE. The guide contains appropriate decision points and transition strategies for developing applications that are affordable, scalable and interoperable across a broad range of computing environments. While useful, the guide does not eliminate the requirement that agencies posses in-depth expertise in software development, communications, and database technology in order to evaluate open systems.
Jankowski, M; Angielski, S; Szczepańska-Konkel, M
2008-03-01
Previous studies from our laboratory have reported a marked reduction in glomerular filtration rate (GFR) and sodium reabsorption in renal proximal tubule during intravenous infusion of P(1),P(4)-diadenosine tetraphosphate (Ap(4)A) at dose of 1.0 micromol/kg + 10 nmol/kg/min (i.v., injection followed by infusion) in anaesthetized Wistar rats. In the present study, the changes of GFR and urine sodium excretion were investigated in response to systemic infusion of Ap(4)A at different doses. Ap(4)A at dose of 0.1 micromol/kg + 1.0 nmol/kg/min did not change GFR and sodium urinary excretion whereas 2-fold higher dose produced significant (3.4-fold) increase in sodium excretion without changes in GFR. Significant but transient reduction in GFR by approximately 21% was observed during infusion of Ap(4)A at dose of 0.5 micromol/kg + 5.0 nmol/kg/min. Higher doses of Ap(4)A (1.0 micromol/kg + 10 nmol/kg/min and 2.0 micromol/kg + 20 nmol/kg/min) reduction in GFR and marked natriuresis. Our results suggest that tubular sodium transport systems are more sensitive to Ap(4)A than systems involved in GFR regulation.
Agrahari, Garima; Liang, Zhong; Mayfield, Jeffrey A; Balsara, Rashna D; Ploplis, Victoria A; Castellino, Francis J
2013-09-20
Group A Streptococcus pyogenes (GAS) strain AP53 is a primary isolate from a patient with necrotizing fasciitis. These AP53 cells contain an inactivating mutation in the sensor component of the cluster of virulence (cov) responder (R)/sensor (S) two-component gene regulatory system (covRS), which enhances the virulence of the primary strain, AP53/covR(+)S(-). However, specific mechanisms by which the covRS system regulates the survival of GAS in humans are incomplete. Here, we show a key role for covRS in the regulation of opsonophagocytosis of AP53 by human neutrophils. AP53/covR(+)S(-) cells displayed potent binding of host complement inhibitors of C3 convertase, viz. Factor H (FH) and C4-binding protein (C4BP), which concomitantly led to minimal C3b deposition on AP53 cells, further showing that these plasma protein inhibitors are active on GAS cells. This resulted in weak killing of the bacteria by human neutrophils and a corresponding high death rate of mice after injection of these cells. After targeted allelic alteration of covS(-) to wild-type covS (covS(+)), a dramatic loss of FH and C4BP binding to the AP53/covR(+)S(+) cells was observed. This resulted in elevated C3b deposition on AP53/covR(+)S(+) cells, a high level of opsonophagocytosis by human neutrophils, and a very low death rate of mice infected with AP53/covR(+)S(+). We show that covRS is a critical transcriptional regulator of genes directing AP53 killing by neutrophils and regulates the levels of the receptors for FH and C4BP, which we identify as the products of the fba and enn genes, respectively.
Procurement of a fully licensed radioisotope thermoelectric generator transportation system
NASA Astrophysics Data System (ADS)
Adkins, Harold E.; Bearden, Thomas E.
The present transportation system for radioisotope thermoelectric generators and heater units is being developed to comply with all applicable U.S. DOT regulations, including a doubly-contained 'bell jar' concept for the required double-containment of plutonium. Modifications in handling equipment and procedures are entailed by this novel packaging design, and will affect high-capacity forklifts, overhead cranes, He-backfilling equipment, etc. Attention is given to the design constraints involved, and to the Federal procurement process.
NASA Technical Reports Server (NTRS)
Ramos, Alberto
2011-01-01
Projects assigned to: (1) Testing, fixing, and procuring enclosure systems and components for Kennedy Ground Controls Systems at launch pad B. (2) Organizational spreadsheets for all subsystems involved in the project. (Procurement, parts lists, drawings, purchase requests, etc) (3) Resolve is a project devoted to the lunar rover that will sample lunar soil in an effort to remove the moister and separate the metal from the oxygen to produce drinkable water. I helped with the humidity environmental generator for the experiment (moister detector).
Extended Antiphospholipid Antibodies Screening in Systemic Lupus Erythematosus Patients.
Dima, Alina; Caraiola, Simona; Jurcut, C; Balanescu, Eugenia; Balanescu, P; Ramba, Doina; Badea, Camelia; Pompilian, V; Ionescu, R; Baicus, Anda; Baicus, C; Dan, G A
2015-01-01
The antiphospholipid syndrome (APS) is one of the most encountered autoimmunity in systemic lupus erythematosus (SLE) patients and pathogenesis of these two seems to be intricate. To investigate the association of antiphospholipid antibodies (APLAs) titer with the presence of secondary APS diagnosis in SLE patients. 65 patients fulfilling the 2012 Systemic Lupus Collaborating International Clinics (SLICC) SLE's criteria were included. The APS diagnosis was sustained according to the 2006 Sydney APS's criteria. Three groups of patients were defined: SLE patients with secondary APS, SLE with history of positive "criteria" APLAs but without APS clinical features, respectively SLE patients without positive APLAs or clinical APS criteria. An extended APLAs panel was searched in all cases: both IgM and IgG of anticardiolipin antibodies (aCL), anti-P2 glycoprotein I antibodies (aβ2GPI), antiphosphatidylethanolamine antibodies (aPE), antiphosphatidylserine antibodies (aPS), respectively antiprothrombin antibodies (aPT). Results. Only the aβ2GPI, both IgM and IgG serotypes, had significantly higher titers in patients with SLE and secondary APS compared to no APS (with/ without positive APLAs): median (min; max) 7.0 (0.0-300.0) vs. 1.0 (0.0-28.0) vs. 1.0 (0.0-12.0), respectively 3.0 (0.0-79.0) vs. 1.0 (0.0-3.0) vs. 1.0 (0.0-12.0) (p<0.001, Kruskal-Wallis test)]. Also, in regression logistic models, only the aβ2 GPI (IgG and IgM ) were identified as risk factors for secondary APS diagnosis in the SLE patients: OR(95%CI) 5.9 (2.2-15.7), respectively 1.3 (1.1-1.5). In regard with the SLE markers, the IgG serotypes of the "non-criteria" APLAs analyzed (aPS, aPT, aPE) were correlated with the antiDNA titers while the IgM serotypes inversely associated with the complement C3 levels. IgG aβ2 GPI are accompanied by almost 6-fold increase risk of secondary APS when screening SLE patients. On the contrary, the "non-criteria" APLAs do not seem associated with the APS diagnosis in SLE patients. Some correlates of the "non-criteria" APLAs with the antiDNA and complement C3 levels were also observed.
Myocardial protection using diadenosine tetraphosphate with pharmacological preconditioning.
Ahmet, I; Sawa, Y; Nishimura, M; Yamaguchi, T; Kitakaze, M; Matsuda, H
2000-09-01
We have reported a similar cardioprotective effect and mechanism of diadenosine tetraphosphate (AP4A) and ischemic preconditioning in rat hearts. In this study, the applicability of AP4A administration to cardiac surgery was tested by using a canine cardiopulmonary bypass model. Hearts underwent 60 minutes of cardioplegic arrest (34 degrees C) by a single dose of cardioplegia. Cardioplegia contained either AP4A (40 micromol/L; n = 6) or saline (n = 6). Beagles were weaned from cardiopulmonary bypass 30 minutes after reperfusion, and left ventricular function was evaluated after another 30 minutes by using the cardiac loop analysis system. Administration of AP4A significantly improved the postischemic recovery of cardiac function and reduced the leakage of serum creatine kinase compared with saline. Systemic vascular resistance, mean aortic blood pressure, and the electrocardiographic indices were not significantly altered by AP4A administration. Administration of AP4A was cardioprotective without apparent adverse effects. Because the cardioprotective mechanism may be similar to that of ischemic preconditioning, the addition of AP4A into cardioplegia may be a novel safe method for clinical application of preconditioning cardioprotection.
Wang, Wei-Ming; Lee, A-Young; Chiang, Cheng-Ming
2008-01-01
The AP-1 transcription factor is a dimeric protein complex formed primarily between Jun (c-Jun, JunB, JunD) and Fos (c-Fos, FosB, Fra-1, Fra-2) family members. These distinct AP-1 complexes are expressed in many cell types and modulate target gene expression implicated in cell proliferation, differentiation, and stress responses. Although the importance of AP-1 has long been recognized, the biochemical characterization of AP-1 remains limited in part due to the difficulty in purifying full-length, reconstituted dimers with active DNA-binding and transcriptional activity. Using a combination of bacterial coexpression and epitope-tagging methods, we successfully purified all 12 heterodimers (3 Jun × 4 Fos) of full-length human AP-1 complexes as well as c-Jun/c-Jun, JunD/JunD, and c-Jun/JunD dimers from bacterial inclusion bodies using one-step nickel-NTA affinity tag purification following denaturation and renaturation of coexpressed AP-1 subunits. Coexpression of two constitutive components in a dimeric AP-1 complex helps stabilize the proteins when compared with individual protein expression in bacteria. Purified dimeric AP-1 complexes are functional in sequence-specific DNA binding, as illustrated by electrophoretic mobility shift assays and DNase I footprinting, and are also active in transcription with in vitro-reconstituted human papillomavirus (HPV) chromatin containing AP-1-binding sites in the native configuration of HPV nucleosomes. The availability of these recombinant full-length human AP-1 complexes has greatly facilitated mechanistic studies of AP-1-regulated gene transcription in many biological systems. PMID:18329890
Wu, Xiang Lan; Kim, Jong Ho; Koo, Heebeom; Bae, Sang Mun; Shin, Hyeri; Kim, Min Sang; Lee, Byung-Heon; Park, Rang-Woon; Kim, In-San; Choi, Kuiwon; Kwon, Ick Chan; Kim, Kwangmeyung; Lee, Doo Sung
2010-02-17
Herein, we prepared tumor-targeting peptide (AP peptide; CRKRLDRN) conjugated pH-responsive polymeric micelles (pH-PMs) in cancer therapy by active and pH-responsive tumor targeting delivery systems, simultaneously. The active tumor targeting and tumoral pH-responsive polymeric micelles were prepared by mixing AP peptide conjugated PEG-poly(d,l-lactic acid) block copolymer (AP-PEG-PLA) into the pH-responsive micelles of methyl ether poly(ethylene glycol) (MPEG)-poly(beta-amino ester) (PAE) block copolymer (MPEG-PAE). These mixed amphiphilic block copolymers were self-assembled to form stable AP peptide-conjugated and pH-responsive AP-PEG-PLA/MPEG-PAE micelles (AP-pH-PMs) with an average size of 150 nm. The AP-pH-PMs containing 10 wt % of AP-PEG-PLA showed a sharp pH-dependent micellization/demicellization transition at the tumoral acid pH. Also, they presented the pH-dependent drug release profile at the acidic pH of 6.4. The fluorescence dye, TRITC, encapsulated AP-pH-PMs (TRITC-AP-pH-PMs) presented the higher tumor-specific targeting ability in vitro cancer cell culture system and in vivo tumor-bearing mice, compared to control pH-responsive micelles of MPEG-PAE. For the cancer therapy, the anticancer drug, doxorubicin (DOX), was efficiently encapsulated into the AP-pH-PMs (DOX-AP-pH-PMs) with a higher loading efficiency. DOX-AP-pH-PMs efficiently deliver anticancer drugs in MDA-MB231 human breast tumor-bearing mice, resulted in excellent anticancer therapeutic efficacy, compared to free DOX and DOX encapsulated MEG-PAE micelles, indicating the excellent tumor targeting ability of AP-pH-PMs. Therefore, these tumor-targeting peptide-conjugated and pH-responsive polymeric micelles have great potential application in cancer therapy.
A Quest for Excellence. Appendix
1986-06-01
the Joint Staff should be removed to permit the Chairman a staff sufficient to discharge his responsibilities. The Secretary of Defense should direct...better coordinated among DoD agencies and Congress. Guidelines must be developed to remove undesirable duplication of official effort and, when...specifically for commercial overall procurement system, with particular procurement are inconsistent and ineffective, attention given to the removal
41 CFR 101-26.309 - Cancellation of orders for GSA stock items.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Cancellation of orders for GSA stock items. 101-26.309 Section 101-26.309 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3...
ERIC Educational Resources Information Center
Donaldosn, William S.; Stephens, Thomas M.
1979-01-01
Sections address the RFP/IFB (Request for Proposals/Invitation for Bids) process and procedures for selecting the "best" contract. In reviewing the federal procurement code, and the recent decision of the Government Accounting Office, particularly regarding the NIMIS (National Instructional Materials Information System contract), inconsistencies…
Code of Federal Regulations, 2010 CFR
2010-10-01
... which meet the definition of âchange to a cost accounting practice.â 9903.302-3 Section 9903.302-3 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS CONTRACT...
Geographic information system-based spatial analysis of sawmill wood procurement
Nathaniel M. Anderson; Rene H. Germain; Eddie Bevilacqua
2011-01-01
In the sawmill sector of the forest products industry, the clustering of mills and wide variation in forest stocking and ownership result in sawlog markets that are complex and spatially differentiated. Despite the inherent spatial attributes of markets for stumpage and logs, few studies have used geospatial methods to examine wood procurement in detail across...
41 CFR 101-26.505-2 - Description of office and household furnishings.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Description of office and household furnishings. 101-26.505-2 Section 101-26.505-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5...
41 CFR 101-26.505-1 - Description of office and household furniture.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Description of office and household furniture. 101-26.505-1 Section 101-26.505-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GS...
Resource allocation for pharmaceutical procurement in the Brazilian Unified Health System.
Vieira, Fabiola Sulpino; Zucchi, Paola
2011-10-01
To analyze resource allocation for pharmaceutical procurement by federative entities in the Brazilian Unified Health System. The amounts allocated to purchase pharmaceuticals during 2009 in two information systems were analyzed: Siga Brasil (Follow Brazil) for national data and Sistema de Informações sobre Orçamentos Públicos em Saúde (Information System on Public Health Budgets) for states, the Federal District and municipalities data. Per capita spending and the mean and median spending were calculated by municipalities, according to region and population size. The Spearman correlation coefficient was calculated for some variables. The statistical analysis included tests of normality and multiple comparisons for differences between groups. In 2009 the total amount spent by the three spheres of government for purchase of medicines was approximately R$ 8.9 billion. States and the Federal District were the main players, accounting for 47.1% of the total amount spent in the health system. Some states had per capita spending well above the mean (R$ 22.00 per resident/year) and the median (R$ 17.00 per resident/year). There were differences in municipal spending by region. The mean per capita expenditure of municipalities with less than 5,000 residents was 3.9 times that of municipalities with over 500,000 residents. Municipalities with less than 10,000 residents had higher per capita spending than other municipalities. Economic aspects such as the scale of procurement and bargaining power may explain differences in per capita spending between federal entities, especially among municipalities. The study indicates inefficiencies in the use of financial resources to procure medicines in the Brazilian Unified Health System.
JPRS Report. Soviet Union: Political Affairs
1988-11-18
administrative system for the city’s fruit and vegetable conveyor, from field to store shelf, in the results of which those who raise, procure and sell the...full severity of the law. The vicious circle in the existing outlay system for the procurement and sales of fruit and vegetables can be broken if the...conduct the battle by banning vodka but not combatting alcohol abuse than it is to find solutions to the problems speci- fied in the national program for
Development of simulation computer complex specification
NASA Technical Reports Server (NTRS)
1973-01-01
The Training Simulation Computer Complex Study was one of three studies contracted in support of preparations for procurement of a shuttle mission simulator for shuttle crew training. The subject study was concerned with definition of the software loads to be imposed on the computer complex to be associated with the shuttle mission simulator and the development of procurement specifications based on the resulting computer requirements. These procurement specifications cover the computer hardware and system software as well as the data conversion equipment required to interface the computer to the simulator hardware. The development of the necessary hardware and software specifications required the execution of a number of related tasks which included, (1) simulation software sizing, (2) computer requirements definition, (3) data conversion equipment requirements definition, (4) system software requirements definition, (5) a simulation management plan, (6) a background survey, and (7) preparation of the specifications.
An ecological systems examination of elder abuse: a week in the life of adult protective services.
Wangmo, Tenzin; Teaster, Pamela B; Grace, James; Wong, Wilson; Mendiondo, Marta S; Blandford, Caitlin; Fisher, Steve; Fardo, David W
2014-01-01
Using Bronfenbrenner's ecological systems model, this study examined allegations of elder abuse made to Kentucky Adult Protective Services (APS) and the investigation that followed, in order to understand how APS addressed the needs of abused elders. Elder abuse allegations made to APS during the study week were collected using 3 study tools. Allegations and resulting investigations were analyzed. During the study week, APS received 1,002 calls alleging elder abuse. Of these, 483 were categorized as reports needing protective services, with 177 reports screened in for investigation and 167 actually investigated. Results describe characteristics of abuse calls, investigations, victims, perpetrators, and total investigation times. Substantiation ratio, recidivism, and whether investigation increased or decreased the risk of abuse were also assessed. An examination of APS casework through the lens of nested systems frames the study findings and discussion. Such an examination has the potential to improve the quality of services provided to older adults.
Human factors in the Naval Air Systems Command: Computer based training
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seamster, T.L.; Snyder, C.E.; Terranova, M.
1988-01-01
Military standards applied to the private sector contracts have a substantial effect on the quality of Computer Based Training (CBT) systems procured for the Naval Air Systems Command. This study evaluated standards regulating the following areas in CBT development and procurement: interactive training systems, cognitive task analysis, and CBT hardware. The objective was to develop some high-level recommendations for evolving standards that will govern the next generation of CBT systems. One of the key recommendations is that there be an integration of the instructional systems development, the human factors engineering, and the software development standards. Recommendations were also made formore » task analysis and CBT hardware standards. (9 refs., 3 figs.)« less
NASA Astrophysics Data System (ADS)
Casagrande, F.; Ganni, V.; Knudsen, P.; Jones, S.; Sidi-Yekhlef, A.; Tatsumoto, H.; Nguyen, C.; Fila, A.; Vargas, G.; Dudley, C.; Joseph, N.; Stanley, S.; Dixon, K.; Norton, R.; Laverdure, N.; Yang, S.
2017-12-01
Construction and installation of the FRIB 4.5 K helium refrigeration system is nearing completion, with compressor system commissioning and 4.5 K refrigerator commissioning on schedule to occur in late 2017. The LINAC 4.5 K helium distribution system, all major process equipment, and the cryogenic distribution for the sub-systems have been procured and delivered. The sub-atmospheric cold box fabrication is planned to begin the summer of 2017, which is on schedule for commissioning in the spring of 2018. Commissioning of the support systems, such as the helium gas storage, helium purifier, and oil processor is planned to be complete by the summer of 2017. This paper presents details of the equipment procured, installation status and commissioning plans.
75 FR 7580 - Proposed Rate Adjustment for Kerr-Philpott System
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-22
..., CP&L-1-A, CP&L-2-A, CP&L-3-A, CP&L-4-A, AP-1-A, AP-2-A, AP-3-A, AP-4-A, NC-1-A, Replacement-2, and... transmission arrangement. Rate Schedule CP&L-1-B Available to public bodies and cooperatives in North Carolina... Carolina Power & Light (also known as Progress Energy Carolinas). Rate Schedule CP&L-2-B Available to...
Servo-controlled hind-limb electrical stimulation for short-term arterial pressure control.
Kawada, Toru; Shimizu, Shuji; Yamamoto, Hiromi; Shishido, Toshiaki; Kamiya, Atsunori; Miyamoto, Tadayoshi; Sunagawa, Kenji; Sugimachi, Masaru
2009-05-01
Autonomic neural intervention is a promising tool for modulating the circulatory system thereby treating some cardiovascular diseases. In 8 pentobarbital-anesthetized cats, it was examined whether the arterial pressure (AP) could be controlled by acupuncture-like hind-limb electrical stimulation (HES). With a 0.5-ms pulse width, HES monotonically reduced AP as the stimulus current increased from 1 to 5 mA, suggesting that the stimulus current could be a primary control variable. In contrast, the depressor effect of HES showed a nadir approximately 10 Hz in the frequency range between 1 and 100 Hz. Dynamic characteristics of the AP response to HES approximated a second-order low-pass filter with dead time (gain: -10.2 +/- 1.6 mmHg/mA, natural frequency: 0.040 +/- 0.004 Hz, damping ratio 1.80 +/- 0.24, dead time: 1.38 +/- 0.13 s, mean +/- SE). Based on these dynamic characteristics, a servo-controlled HES system was developed. When a target AP value was set at 20 mmHg below the baseline AP, the time required for the AP response to reach 90% of the target level was 38 +/- 10 s. The steady-state error between the measured and target AP values was 1.3 +/- 0.1 mmHg. Autonomic neural intervention by acupuncture-like HES might provide an additional modality to quantitatively control the circulatory system.
Donor conversion and procurement failure: the fate of our potential organ donors.
Branco, Bernardino C; Inaba, Kenji; Lam, Lydia; Salim, Ali; Barmparas, Galinos; Teixeira, Pedro G R; Talving, Peep; Demetriades, Demetrios
2011-02-01
Donor availability remains the primary limiting factor for organ transplantation today. The purpose of this study was to examine the causes of procurement failure amongst potential organ donors. After Institutional Review Board approval, all surgical intensive care unit (SICU) patients admitted to the LAC+USC Medical Center from 01/2006 to 12/2008 who became potential organ donors were identified. Demographics, clinical data, and procurement data were abstracted. In non-donors, the causes of procurement failure were documented. During the 3-year study period, a total of 254 patients were evaluated for organ donation. Mean age was 44.8±18.7 years; 191 (75.2%) were male, 136 (53.5%) were Hispanic, and 148 (58.3%) were trauma patients. Of the 254 patients, 116 (45.7%) were not eligible for donation: 34 had multi-system organ failure, 24 did not progress to brain death and had support withdrawn, 18 had uncontrolled sepsis, 15 had malignancy, 6 had human immunodeficiency virus or hepatitis B or C, and 19 patients had other contraindications to organ donation. Of the remaining 138 eligible patients, 83 (60.2%) did not donate: 56 because the family denied consent, 9 by their own choice. In six, next of kin could not be located, five died because of hemodynamic instability before organ procurement was possible, four had organs that could not be placed, and three had their organs declined by the organ procurement organization. The overall consent rate was 57.5% (n=67). From the 55 donors, 255 organs were procured (yield 4.6 organs/donor). Of all patients screened for organ donation, only a fifth actually donated. Denial of consent was the major potentially preventable cause of procurement failure, whereas hemodynamic instability accounted for only a small percentage of donor losses. With such low conversion rates, the preventable causes of procurement failure warrant further study.
Cost analysis of Navy acquisition alternatives for the NAVSTAR Global Positioning System
NASA Astrophysics Data System (ADS)
Darcy, T. F.; Smith, G. P.
1982-12-01
This research analyzes the life cycle cost (LCC) of the Navy's current and two hypothetical procurement alternatives for NAVSTAR Global Positioning System (GPS) user equipment. Costs are derived by the ARINC Research Corporation ACBEN cost estimating system. Data presentation is in a comparative format describing individual alternative LCC and differential costs between alternatives. Sensitivity analysis explores the impact receiver-processor unit (RPU) first unit production cost has on individual alternative LCC, as well as cost differentials between each alternative. Several benefits are discussed that might provide sufficient cost savings and/or system effectiveness improvements to warrant a procurement strategy other than the existing proposal.
Procurement of a more efficient railroad system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detmold, P.J.
An analysis of how new technology penetrates the railroad system and who initiates the changes suggests ways for improving the procedures. The author identifies a six-step process in transport development which includes invention, innovation, information dissemination, and persuasion. He concludes that poor economic justification and the lack of capital explain the low rate of equipment replacement. The nature of the market and the need for standardized specification appear to influence procurement changes, but both suppliers and transport operators must be convinced of the need for change. The Advanced Train Control Systems Project illustrates how the initiation process works.
Assessing bone banking activities at University of Malaya medical centre.
Mohd, Suhaili; Samsuddin, Sharifah Mazni; Ramalingam, Saravana; Min, Ng Wuey; Yusof, Norimah; Zaman, T Kamarul; Mansor, Azura
2015-12-01
The main advantage of establishing in-house bone banks is its ability to readily provide allograft bones for local surgeries. Bone procurement activities of our university bone bank during the 10 years of operation were reviewed. Socio-demographic data of donors, types of bone procured, cases of rejected bones and types of allograft bones transplanted are presented. From 179 potential donors, 73 % were accepted with 213 procured bones. Femoral head was the common bone transplanted (45 %), as it was also the most common procured (82 %). Bones were rejected mainly due to non-technical reasons (83 %) rather than positive results of microbiological (13 %) and serological (4 %) tests. Comprehensive data could not be obtained for further analysis due to difficulties in retrieving information. Therefore, quality assurance system was improved to establish more systematic documentations, as the basis of good banking practice with process control hence allowing traceability.
Giving until it hurts: prisoners are not the answer to the national organ shortage.
Hinkle, Whitney
2002-01-01
This Note argues that prisoners, whether executed or living, should not become organ donors. The introduction acknowledges the shortage of transplantable organs in the United States and the steps that have been taken to ameliorate the crisis. Part I discusses the procurement of organs from executed prisoners, beginning with a brief examination of China, a country where this type of procurement is routinely practiced. Part I also examines organ procurement legislation pertaining to executed prisoners. Finally, Part I asserts the reasons that prisoners should not become donors, including the dead donor rule, the ban against physicians as executioners, the Oath of Hippocrates, the risk of transmissible diseases, and the negative perception that would result if organ procurement was tied to executions. Part II of this Note discusses prisoners donating their organs in return for mitigated sentences. Part II then argues that this practice should not be adopted because of the lack of informed consent and voluntary choice. Finally, Part III of this Note introduces potential solutions to the possibility of maintaining a voluntary system, moving to a presumed consent system, and using financial inducements to create a larger supply of transplantable organs.
NASA Astrophysics Data System (ADS)
Khademi, April; Hosseinzadeh, Danoush
2014-03-01
Alzheimer's disease (AD) is the most common form of dementia in the elderly characterized by extracellular deposition of amyloid plaques (AP). Using animal models, AP loads have been manually measured from histological specimens to understand disease etiology, as well as response to treatment. Due to the manual nature of these approaches, obtaining the AP load is labourious, subjective and error prone. Automated algorithms can be designed to alleviate these challenges by objectively segmenting AP. In this paper, we focus on the development of a novel algorithm for AP segmentation based on robust preprocessing and a Type II fuzzy system. Type II fuzzy systems are much more advantageous over the traditional Type I fuzzy systems, since ambiguity in the membership function may be modeled and exploited to generate excellent segmentation results. The ambiguity in the membership function is defined as an adaptively changing parameter that is tuned based on the local contrast characteristics of the image. Using transgenic mouse brains with AP ground truth, validation studies were carried out showing a high degree of overlap and low degree of oversegmentation (0.8233 and 0.0917, respectively). The results highlight that such a framework is able to handle plaques of various types (diffuse, punctate), plaques with varying Aβ concentrations as well as intensity variation caused by treatment effects or staining variability.