Conception of Self-Construction Production Scheduling System
NASA Astrophysics Data System (ADS)
Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru
With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.
Product Use Scheduler: A Scheduling Module used in EPA’s Human Exposure Model
The scheduling model (SM) was developed for scheduling the use of consumer products in the U.S. EPA’s Human Exposure Model (HEM), an integrated modeling system to estimate human exposure to chemicals in household consumer products. The SM begins with year-long daily activit...
Research on the ITOC based scheduling system for ship piping production
NASA Astrophysics Data System (ADS)
Li, Rui; Liu, Yu-Jun; Hamada, Kunihiro
2010-12-01
Manufacturing of ship piping systems is one of the major production activities in shipbuilding. The schedule of pipe production has an important impact on the master schedule of shipbuilding. In this research, the ITOC concept was introduced to solve the scheduling problems of a piping factory, and an intelligent scheduling system was developed. The system, in which a product model, an operation model, a factory model, and a knowledge database of piping production were integrated, automated the planning process and production scheduling. Details of the above points were discussed. Moreover, an application of the system in a piping factory, which achieved a higher level of performance as measured by tardiness, lead time, and inventory, was demonstrated.
Study of the impact of cruise speed on scheduling and productivity of commercial transport aircraft
NASA Technical Reports Server (NTRS)
Bond, E. Q.; Carroll, E. A.; Flume, R. A.
1977-01-01
A comparison is made between airplane productivity and utilization levels derived from commercial airline type schedules which were developed for two subsonic and four supersonic cruise speed aircraft. The cruise speed component is the only difference between the schedules which are based on 1995 passenger demand forecasts. Productivity-to-speed relationships were determined for the three discrete route systems: North Atlantic, Trans-Pacific, and North-South America. Selected combinations of these route systems were also studied. Other areas affecting the productivity-to-speed relationship such as aircraft design range and scheduled turn time were examined.
Creative employee scheduling in the health information management department.
Hyde, C S
1998-02-01
What effect do schedules have on employees and department activities? Negative effects such as backlogs, poor employee morale, and absenteeism may be due to scheduling practices currently in place. The value of effective employee scheduling practices may be seen in areas of improved productivity. The process of developing schedules should include assessing department areas, understanding operational needs, choosing an option, and implementation. Finding a schedule that meets the needs of managers as well as those of the employees is rewarding. It is a win-win situation, and the benefits can yield increased productivity, decreased turnover, and higher morale.
Optimisation of assembly scheduling in VCIM systems using genetic algorithm
NASA Astrophysics Data System (ADS)
Dao, Son Duy; Abhary, Kazem; Marian, Romeo
2017-09-01
Assembly plays an important role in any production system as it constitutes a significant portion of the lead time and cost of a product. Virtual computer-integrated manufacturing (VCIM) system is a modern production system being conceptually developed to extend the application of traditional computer-integrated manufacturing (CIM) system to global level. Assembly scheduling in VCIM systems is quite different from one in traditional production systems because of the difference in the working principles of the two systems. In this article, the assembly scheduling problem in VCIM systems is modeled and then an integrated approach based on genetic algorithm (GA) is proposed to search for a global optimised solution to the problem. Because of dynamic nature of the scheduling problem, a novel GA with unique chromosome representation and modified genetic operations is developed herein. Robustness of the proposed approach is verified by a numerical example.
Increasing operating room productivity by duration categories and a newsvendor model.
Lehtonen, Juha-Matti; Torkki, Paulus; Peltokorpi, Antti; Moilanen, Teemu
2013-01-01
Previous studies approach surgery scheduling mainly from the mathematical modeling perspective which is often hard to apply in a practical environment. The aim of this study is to develop a practical scheduling system that considers the advantages of both surgery categorization and newsvendor model to surgery scheduling. The research was carried out in a Finnish orthopaedic specialist centre that performs only joint replacement surgery. Four surgery categorization scenarios were defined and their productivity analyzed by simulation and newsvendor model. Detailed analyses of surgery durations and the use of more accurate case categories and their combinations in scheduling improved OR productivity 11.3 percent when compared to the base case. Planning to have one OR team to work longer led to remarkable decrease in scheduling inefficiency. In surgical services, productivity and cost-efficiency can be improved by utilizing historical data in case scheduling and by increasing flexibility in personnel management. The study increases the understanding of practical scheduling methods used to improve efficiency in surgical services.
Automated Scheduling Via Artificial Intelligence
NASA Technical Reports Server (NTRS)
Biefeld, Eric W.; Cooper, Lynne P.
1991-01-01
Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.
NASA Astrophysics Data System (ADS)
Aziz, Fazilah Abdul; Razali, Noraini; Najmiyah Jaafar, Nur
2016-02-01
Currently there are many automotive companies still unable to effectively prevent consequences of poor ergonomics in their manufacturing processes. This study purpose is to determine the surrounding factors that influence low ergonomics risk awareness among staffs at early product development phase in Malaysia automotive industry. In this study there are four variables, low ergonomic risk awareness, inappropriate method and tools, tight development schedule and lack of management support. The survey data were gathered from 245 respondents of local automotive companies in Malaysia. The data was analysed through multiple regression and moderated regression using the IBM SPSS software. Study results revealed that low ergonomic risk awareness has influenced by inappropriate method and tool, and tight development schedule. There were positive linear relationships between low ergonomic risk awareness and inappropriate method and tools, and tight development schedule. The more inappropriate method and tools applied; the lower their ergonomic risk awareness. The more tight development schedule is the lower ergonomic risk awareness. The relationship between low ergonomic risk awareness and inappropriate method and tools depends on staff's age, and education level. Furthermore the relationship between low ergonomic risk awareness and tight development schedule depends on staff's working experience and number of project involvement. The main contribution of this paper was identified the number of factors of low ergonomics risk awareness and offers better understanding on ergonomics among researchers and automotive manufacturer's employees during product development process.
Ponzio, Todd A; Feindt, Hans; Ferguson, Steven
2011-09-01
Biopharmaceuticals are therapeutic products based on biotechnology. They are manufactured by or from living organisms and are the most complex of all commercial medicines to develop, manufacture and qualify for regulatory approval. In recent years biopharmaceuticals have rapidly increased in number and importance with over 400() already marketed in the U.S. and European markets alone. Many companies throughout the world are now ramping up investments in biopharmaceutical R&D and expanding their portfolios through licensing of early-stage biotechnologies from universities and other non-profit research institutions, and there is an increasing number of license agreements for biopharmaceutical product development relative to traditional small molecule drug compounds. This trend will only continue as large numbers of biosimilars and biogenerics enter the market.A primary goal of technology transfer offices associated with publicly-funded, non-profit research institutions is to establish patent protection for inventions deemed to have commercial potential and license them for product development. Such licenses help stimulate economic development and job creation, bring a stream of royalty revenue to the institution and, hopefully, advance the public good or public health by bringing new and useful products to market. In the course of applying for such licenses, a commercial development plan is usually put forth by the license applicant. This plan indicates the path the applicant expects to follow to bring the licensed invention to market. In the case of small molecule drug compounds, there exists a widely-recognized series of clinical development steps, dictated by regulatory requirements, that must be met to bring a new drug to market, such as completion of preclinical toxicology, Phase 1, 2 and 3 testing and product approvals. These steps often become the milestone/benchmark schedule incorporated into license agreements which technology transfer offices use to monitor the licensee's diligence and progress; most exclusive licenses include a commercial development plan, with penalties, financial or even revocation of the license, if the plan is not followed, e.g., the license falls too far behind.This study examines whether developmental milestone schedules based on a small molecule drug development model are useful and realistic in setting expectations for biopharmaceutical product development. We reviewed the monitoring records of all exclusive Public Health Service (PHS) commercial development license agreements for small molecule drugs or therapeutics based on biotechnology (biopharmaceuticals) executed by the National Institutes of Health (NIH) Office of Technology Transfer (OTT) between 2003 and 2009. We found that most biopharmaceutical development license agreements required amending because developmental milestones in the negotiated schedule could not be met by the licensee. This was in stark contrast with license agreements for small molecule chemical compounds which rarely needed changes to their developmental milestone schedules. As commercial development licenses for biopharmaceuticals make up the vast majority of NIH's exclusive license agreements, there is clearly a need to: 1) more closely examine how these benchmark schedules are formed, 2) try to understand the particular risk factors contributing to benchmark schedule non-compliance, and 3) devise alternatives to the current license benchmark schedule structural model. Schedules that properly weigh the most relevant risk factors such as technology classification (e.g., vaccine vs recombinant antibody vs gene therapy), likelihood of unforeseen regulatory issues, and company size/structure may help assure compliance with original license benchmark schedules. This understanding, coupled with a modified approach to the license negotiation process that makes use of a clear and comprehensive term sheet to minimize ambiguities should result in a more realistic benchmark schedule.
Ponzio, Todd A.; Feindt, Hans; Ferguson, Steven
2011-01-01
Summary Biopharmaceuticals are therapeutic products based on biotechnology. They are manufactured by or from living organisms and are the most complex of all commercial medicines to develop, manufacture and qualify for regulatory approval. In recent years biopharmaceuticals have rapidly increased in number and importance with over 4001 already marketed in the U.S. and European markets alone. Many companies throughout the world are now ramping up investments in biopharmaceutical R&D and expanding their portfolios through licensing of early-stage biotechnologies from universities and other non-profit research institutions, and there is an increasing number of license agreements for biopharmaceutical product development relative to traditional small molecule drug compounds. This trend will only continue as large numbers of biosimilars and biogenerics enter the market. A primary goal of technology transfer offices associated with publicly-funded, non-profit research institutions is to establish patent protection for inventions deemed to have commercial potential and license them for product development. Such licenses help stimulate economic development and job creation, bring a stream of royalty revenue to the institution and, hopefully, advance the public good or public health by bringing new and useful products to market. In the course of applying for such licenses, a commercial development plan is usually put forth by the license applicant. This plan indicates the path the applicant expects to follow to bring the licensed invention to market. In the case of small molecule drug compounds, there exists a widely-recognized series of clinical development steps, dictated by regulatory requirements, that must be met to bring a new drug to market, such as completion of preclinical toxicology, Phase 1, 2 and 3 testing and product approvals. These steps often become the milestone/benchmark schedule incorporated into license agreements which technology transfer offices use to monitor the licensee’s diligence and progress; most exclusive licenses include a commercial development plan, with penalties, financial or even revocation of the license, if the plan is not followed, e.g., the license falls too far behind. This study examines whether developmental milestone schedules based on a small molecule drug development model are useful and realistic in setting expectations for biopharmaceutical product development. We reviewed the monitoring records of all exclusive Public Health Service (PHS) commercial development license agreements for small molecule drugs or therapeutics based on biotechnology (biopharmaceuticals) executed by the National Institutes of Health (NIH) Office of Technology Transfer (OTT) between 2003 and 2009. We found that most biopharmaceutical development license agreements required amending because developmental milestones in the negotiated schedule could not be met by the licensee. This was in stark contrast with license agreements for small molecule chemical compounds which rarely needed changes to their developmental milestone schedules. As commercial development licenses for biopharmaceuticals make up the vast majority of NIH’s exclusive license agreements, there is clearly a need to: 1) more closely examine how these benchmark schedules are formed, 2) try to understand the particular risk factors contributing to benchmark schedule non-compliance, and 3) devise alternatives to the current license benchmark schedule structural model. Schedules that properly weigh the most relevant risk factors such as technology classification (e.g., vaccine vs recombinant antibody vs gene therapy), likelihood of unforeseen regulatory issues, and company size/structure may help assure compliance with original license benchmark schedules. This understanding, coupled with a modified approach to the license negotiation process that makes use of a clear and comprehensive term sheet to minimize ambiguities should result in a more realistic benchmark schedule. PMID:22162900
A Genetic Algorithm for Flow Shop Scheduling with Assembly Operations to Minimize Makespan
NASA Astrophysics Data System (ADS)
Bhongade, A. S.; Khodke, P. M.
2014-04-01
Manufacturing systems, in which, several parts are processed through machining workstations and later assembled to form final products, is common. Though scheduling of such problems are solved using heuristics, available solution approaches can provide solution for only moderate sized problems due to large computation time required. In this work, scheduling approach is developed for such flow-shop manufacturing system having machining workstations followed by assembly workstations. The initial schedule is generated using Disjunctive method and genetic algorithm (GA) is applied further for generating schedule for large sized problems. GA is found to give near optimal solution based on the deviation of makespan from lower bound. The lower bound of makespan of such problem is estimated and percent deviation of makespan from lower bounds is used as a performance measure to evaluate the schedules. Computational experiments are conducted on problems developed using fractional factorial orthogonal array, varying the number of parts per product, number of products, and number of workstations (ranging upto 1,520 number of operations). A statistical analysis indicated the significance of all the three factors considered. It is concluded that GA method can obtain optimal makespan.
NASA Astrophysics Data System (ADS)
Paksi, A. B. N.; Ma'ruf, A.
2016-02-01
In general, both machines and human resources are needed for processing a job on production floor. However, most classical scheduling problems have ignored the possible constraint caused by availability of workers and have considered only machines as a limited resource. In addition, along with production technology development, routing flexibility appears as a consequence of high product variety and medium demand for each product. Routing flexibility is caused by capability of machines that offers more than one machining process. This paper presents a method to address scheduling problem constrained by both machines and workers, considering routing flexibility. Scheduling in a Dual-Resource Constrained shop is categorized as NP-hard problem that needs long computational time. Meta-heuristic approach, based on Genetic Algorithm, is used due to its practical implementation in industry. Developed Genetic Algorithm uses indirect chromosome representative and procedure to transform chromosome into Gantt chart. Genetic operators, namely selection, elitism, crossover, and mutation are developed to search the best fitness value until steady state condition is achieved. A case study in a manufacturing SME is used to minimize tardiness as objective function. The algorithm has shown 25.6% reduction of tardiness, equal to 43.5 hours.
Developing optimal nurses work schedule using integer programming
NASA Astrophysics Data System (ADS)
Shahidin, Ainon Mardhiyah; Said, Mohd Syazwan Md; Said, Noor Hizwan Mohamad; Sazali, Noor Izatie Amaliena
2017-08-01
Time management is the art of arranging, organizing and scheduling one's time for the purpose of generating more effective work and productivity. Scheduling is the process of deciding how to commit resources between varieties of possible tasks. Thus, it is crucial for every organization to have a good work schedule for their staffs. The job of Ward nurses at hospitals runs for 24 hours every day. Therefore, nurses will be working using shift scheduling. This study is aimed to solve the nurse scheduling problem at an emergency ward of a private hospital. A 7-day work schedule for 7 consecutive weeks satisfying all the constraints set by the hospital will be developed using Integer Programming. The work schedule for the nurses obtained gives an optimal solution where all the constraints are being satisfied successfully.
User’s guide to SNAP for ArcGIS® :ArcGIS interface for scheduling and network analysis program
Woodam Chung; Dennis Dykstra; Fred Bower; Stephen O’Brien; Richard Abt; John. and Sessions
2012-01-01
This document introduces a computer software named SNAP for ArcGIS® , which has been developed to streamline scheduling and transportation planning for timber harvest areas. Using modern optimization techniques, it can be used to spatially schedule timber harvest with consideration of harvesting costs, multiple products, alternative...
COMPASS: A general purpose computer aided scheduling tool
NASA Technical Reports Server (NTRS)
Mcmahon, Mary Beth; Fox, Barry; Culbert, Chris
1991-01-01
COMPASS is a generic scheduling system developed by McDonnell Douglas under the direction of the Software Technology Branch at JSC. COMPASS is intended to illustrate the latest advances in scheduling technology and provide a basis from which custom scheduling systems can be built. COMPASS was written in Ada to promote readability and to conform to potential NASA Space Station Freedom standards. COMPASS has some unique characteristics that distinguishes it from commercial products. These characteristics are discussed and used to illustrate some differences between scheduling tools.
COMPASS: An Ada based scheduler
NASA Technical Reports Server (NTRS)
Mcmahon, Mary Beth; Culbert, Chris
1992-01-01
COMPASS is a generic scheduling system developed by McDonnell Douglas and funded by the Software Technology Branch of NASA Johnson Space Center. The motivation behind COMPASS is to illustrate scheduling technology and provide a basis from which custom scheduling systems can be built. COMPASS was written in Ada to promote readability and to conform to DOD standards. COMPASS has some unique characteristics that distinguishes it from commercial products. This paper discusses these characteristics and uses them to illustrate some differences between scheduling tools.
Production Scheduling for Rehabilitation Workshops.
ERIC Educational Resources Information Center
Hietala, David A.
This publication examines production scheduling procedures for sheltered workshops. The manual includes three major sections: (1) the importance and benefits of production scheduling; (2) how-to information on performing basic scheduling in the workshop; and (3) answers to the question, What makes production scheduling work? The scheduling…
Research on Production Scheduling System with Bottleneck Based on Multi-agent
NASA Astrophysics Data System (ADS)
Zhenqiang, Bao; Weiye, Wang; Peng, Wang; Pan, Quanke
Aimed at the imbalance problem of resource capacity in Production Scheduling System, this paper uses Production Scheduling System based on multi-agent which has been constructed, and combines the dynamic and autonomous of Agent; the bottleneck problem in the scheduling is solved dynamically. Firstly, this paper uses Bottleneck Resource Agent to find out the bottleneck resource in the production line, analyses the inherent mechanism of bottleneck, and describes the production scheduling process based on bottleneck resource. Bottleneck Decomposition Agent harmonizes the relationship of job's arrival time and transfer time in Bottleneck Resource Agent and Non-Bottleneck Resource Agents, therefore, the dynamic scheduling problem is simplified as the single machine scheduling of each resource which takes part in the scheduling. Finally, the dynamic real-time scheduling problem is effectively solved in Production Scheduling System.
Yu, Yang; Wang, Sihan; Tang, Jiafu; Kaku, Ikou; Sun, Wei
2016-01-01
Productivity can be greatly improved by converting the traditional assembly line to a seru system, especially in the business environment with short product life cycles, uncertain product types and fluctuating production volumes. Line-seru conversion includes two decision processes, i.e., seru formation and seru load. For simplicity, however, previous studies focus on the seru formation with a given scheduling rule in seru load. We select ten scheduling rules usually used in seru load to investigate the influence of different scheduling rules on the performance of line-seru conversion. Moreover, we clarify the complexities of line-seru conversion for ten different scheduling rules from the theoretical perspective. In addition, multi-objective decisions are often used in line-seru conversion. To obtain Pareto-optimal solutions of multi-objective line-seru conversion, we develop two improved exact algorithms based on reducing time complexity and space complexity respectively. Compared with the enumeration based on non-dominated sorting to solve multi-objective problem, the two improved exact algorithms saves computation time greatly. Several numerical simulation experiments are performed to show the performance improvement brought by the two proposed exact algorithms.
Scheduling the future NASA Space Network: Experiences with a flexible scheduling prototype
NASA Technical Reports Server (NTRS)
Happell, Nadine; Moe, Karen L.; Minnix, Jay
1993-01-01
NASA's Space Network (SN) provides telecommunications and tracking services to low earth orbiting spacecraft. One proposal for improving resource allocation and automating conflict resolution for the SN is the concept of flexible scheduling. In this concept, each Payload Operations Control Center (POCC) will possess a Space Network User POCC Interface (SNUPI) to support the development and management of flexible requests. Flexible requests express the flexibility, constraints, and repetitious nature of the user's communications requirements. Flexible scheduling is expected to improve SN resource utilization and user satisfaction, as well as reduce the effort to produce and maintain a schedule. A prototype testbed has been developed to better understand flexible scheduling as it applies to the SN. This testbed consists of a SNUPI workstation, an SN scheduler, and a flexible request language that conveys information between the two systems. All three are being evaluated by operations personnel. Benchmark testing is being conducted on the scheduler to quantify the productivity improvements achieved with flexible requests.
NASA Astrophysics Data System (ADS)
Chang, Yung-Chia; Li, Vincent C.; Chiang, Chia-Ju
2014-04-01
Make-to-order or direct-order business models that require close interaction between production and distribution activities have been adopted by many enterprises in order to be competitive in demanding markets. This article considers an integrated production and distribution scheduling problem in which jobs are first processed by one of the unrelated parallel machines and then distributed to corresponding customers by capacitated vehicles without intermediate inventory. The objective is to find a joint production and distribution schedule so that the weighted sum of total weighted job delivery time and the total distribution cost is minimized. This article presents a mathematical model for describing the problem and designs an algorithm using ant colony optimization. Computational experiments illustrate that the algorithm developed is capable of generating near-optimal solutions. The computational results also demonstrate the value of integrating production and distribution in the model for the studied problem.
NASA Technical Reports Server (NTRS)
Cowderoy, A. J. C.; Jenkins, John O.; Poulymenakou, A
1992-01-01
The tendency for software development projects to be completed over schedule and over budget was documented extensively. Additionally many projects are completed within budgetary and schedule target only as a result of the customer agreeing to accept reduced functionality. In his classic book, The Mythical Man Month, Fred Brooks exposes the fallacy that effort and schedule are freely interchangeable. All current cost models are produced on the assumption that there is very limited scope for schedule compression unless there is a corresponding reduction in delivered functionality. The Metrication and Resources Modeling Aid (MERMAID) project, partially financed by the Commission of the European Communities (CEC) as Project 2046 began in Oct. 1988 and its goal were as follows: (1) improvement of understanding of the relationships between software development productivity and product and process metrics; (2) to facilitate the widespread technology transfer from the Consortium to the European Software Industry; and (3) to facilitate the widespread uptake of cost estimation techniques by the provision of prototype cost estimation tools. MERMAID developed a family of methods for cost estimation, many of which have had tools implemented in prototypes. These prototypes are best considered as toolkits or workbenches.
NASA Technical Reports Server (NTRS)
1992-01-01
C Language Integrated Production System (CLIPS) was used by Esse Systems to develop an expert system for clients who want to automate portions of their operations. The resulting program acts as a scheduling expert and automates routine, repetitive scheduling decisions, allowing employees to spend time on more creative projects.
2016-04-01
3Concurrency is broadly defined as the overlap between technology development and product development or between product development and...reported extensively on the F-35 program’s cost, schedule, and performance problems. The program plans to begin increasing production rates over the...internal DOD program analyses. GAO also collected and analyzed production and supply chain performance data, and interviewed DOD, program, and
An Optimization of Manufacturing Systems using a Feedback Control Scheduling Model
NASA Astrophysics Data System (ADS)
Ikome, John M.; Kanakana, Grace M.
2018-03-01
In complex production system that involves multiple process, unplanned disruption often turn to make the entire production system vulnerable to a number of problems which leads to customer’s dissatisfaction. However, this problem has been an ongoing problem that requires a research and methods to streamline the entire process or develop a model that will address it, in contrast to this, we have developed a feedback scheduling model that can minimize some of this problem and after a number of experiment, it shows that some of this problems can be eliminated if the correct remedial actions are implemented on time.
Vectorization of a penalty function algorithm for well scheduling
NASA Technical Reports Server (NTRS)
Absar, I.
1984-01-01
In petroleum engineering, the oil production profiles of a reservoir can be simulated by using a finite gridded model. This profile is affected by the number and choice of wells which in turn is a result of various production limits and constraints including, for example, the economic minimum well spacing, the number of drilling rigs available and the time required to drill and complete a well. After a well is available it may be shut in because of excessive water or gas productions. In order to optimize the field performance a penalty function algorithm was developed for scheduling wells. For an example with some 343 wells and 15 different constraints, the scheduling routine vectorized for the CYBER 205 averaged 560 times faster performance than the scalar version.
Technology for Manufacturing Efficiency
NASA Technical Reports Server (NTRS)
1995-01-01
The Ground Processing Scheduling System (GPSS) was developed by Ames Research Center, Kennedy Space Center and divisions of the Lockheed Company to maintain the scheduling for preparing a Space Shuttle Orbiter for a mission. Red Pepper Software Company, now part of PeopleSoft, Inc., commercialized the software as their ResponseAgent product line. The software enables users to monitor manufacturing variables, report issues and develop solutions to existing problems.
Effective Schedule and Cost Management as a Product Development Lead
NASA Technical Reports Server (NTRS)
Simmons, Cynthia
2015-01-01
The presentation will be given at the 26th Annual Thermal Fluids Analysis Workshop (TFAWS 2015) hosted by the Goddard SpaceFlight Center (GSFC) Thermal Engineering Branch (Code 545). This course provides best practices, helpful tools and lessons learned for staying on plan and day-to-day management of Subsystem flight development after getting Project approval for your Subsystem schedule and budget baseline.
Design and specification of a centralized manufacturing data management and scheduling system
NASA Technical Reports Server (NTRS)
Farrington, Phillip A.
1993-01-01
As was revealed in a previous study, the Materials and Processes Laboratory's Productivity Enhancement Complex (PEC) has a number of automated production areas/cells that are not effectively integrated, limiting the ability of users to readily share data. The recent decision to utilize the PEC for the fabrication of flight hardware has focused new attention on the problem and brought to light the need for an integrated data management and scheduling system. This report addresses this need by developing preliminary designs specifications for a centralized manufacturing data management and scheduling system for managing flight hardware fabrication in the PEC. This prototype system will be developed under the auspices of the Integrated Engineering Environment (IEE) Oversight team and the IEE Committee. At their recommendation the system specifications were based on the fabrication requirements of the AXAF-S Optical Bench.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Flory, John Andrew; Padilla, Denise D.; Gauthier, John H.
Upcoming weapon programs require an aggressive increase in Application Specific Integrated Circuit (ASIC) production at Sandia National Laboratories (SNL). SNL has developed unique modeling and optimization tools that have been instrumental in improving ASIC production productivity and efficiency, identifying optimal operational and tactical execution plans under resource constraints, and providing confidence in successful mission execution. With ten products and unprecedented levels of demand, a single set of shared resources, highly variable processes, and the need for external supplier task synchronization, scheduling is an integral part of successful manufacturing. The scheduler uses an iterative multi-objective genetic algorithm and a multi-dimensional performancemore » evaluator. Schedule feasibility is assessed using a discrete event simulation (DES) that incorporates operational uncertainty, variability, and resource availability. The tools provide rapid scenario assessments and responses to variances in the operational environment, and have been used to inform major equipment investments and workforce planning decisions in multiple SNL facilities.« less
Production scheduling with ant colony optimization
NASA Astrophysics Data System (ADS)
Chernigovskiy, A. S.; Kapulin, D. V.; Noskova, E. E.; Yamskikh, T. N.; Tsarev, R. Yu
2017-10-01
The optimum solution of the production scheduling problem for manufacturing processes at an enterprise is crucial as it allows one to obtain the required amount of production within a specified time frame. Optimum production schedule can be found using a variety of optimization algorithms or scheduling algorithms. Ant colony optimization is one of well-known techniques to solve the global multi-objective optimization problem. In the article, the authors present a solution of the production scheduling problem by means of an ant colony optimization algorithm. A case study of the algorithm efficiency estimated against some others production scheduling algorithms is presented. Advantages of the ant colony optimization algorithm and its beneficial effect on the manufacturing process are provided.
77 FR 47047 - Biomass Research and Development Technical Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-07
... research and development leading to the production of biobased fuels and biobased products. Tentative... Research and Development Technical Advisory Committee. To attend the meeting and/or to make oral statements... at the beginning of the meeting. Reasonable provision will be made to include the scheduled oral...
Project Listen Compute Show (LCS) - Marine
2004-02-01
Figure 15. Block diagram of a BB-5. Notice the discrete components between the FPGA and the display connection. All of these are scheduled to be... scheduled to form the core of the next generation projection product. This architecture is expected to scale to true HDTV resolution of 1920 by 1080...flight schedule obtained from a SABRE database in order to offer on-time status. We have developed more sophisticated mechanisms for dealing with
Cost and schedule estimation study report
NASA Technical Reports Server (NTRS)
Condon, Steve; Regardie, Myrna; Stark, Mike; Waligora, Sharon
1993-01-01
This report describes the analysis performed and the findings of a study of the software development cost and schedule estimation models used by the Flight Dynamics Division (FDD), Goddard Space Flight Center. The study analyzes typical FDD projects, focusing primarily on those developed since 1982. The study reconfirms the standard SEL effort estimation model that is based on size adjusted for reuse; however, guidelines for the productivity and growth parameters in the baseline effort model have been updated. The study also produced a schedule prediction model based on empirical data that varies depending on application type. Models for the distribution of effort and schedule by life-cycle phase are also presented. Finally, this report explains how to use these models to plan SEL projects.
NASA Astrophysics Data System (ADS)
Setiawan, A.; Wangsaputra, R.; Martawirya, Y. Y.; Halim, A. H.
2016-02-01
This paper deals with Flexible Manufacturing System (FMS) production rescheduling due to unavailability of cutting tools caused either of cutting tool failure or life time limit. The FMS consists of parallel identical machines integrated with an automatic material handling system and it runs fully automatically. Each machine has a same cutting tool configuration that consists of different geometrical cutting tool types on each tool magazine. The job usually takes two stages. Each stage has sequential operations allocated to machines considering the cutting tool life. In the real situation, the cutting tool can fail before the cutting tool life is reached. The objective in this paper is to develop a dynamic scheduling algorithm when a cutting tool is broken during unmanned and a rescheduling needed. The algorithm consists of four steps. The first step is generating initial schedule, the second step is determination the cutting tool failure time, the third step is determination of system status at cutting tool failure time and the fourth step is the rescheduling for unfinished jobs. The approaches to solve the problem are complete-reactive scheduling and robust-proactive scheduling. The new schedules result differences starting time and completion time of each operations from the initial schedule.
Understanding Acquisition Cycle Time: Focusing the Research Problem
2013-11-01
Browning, Tyson R., and Steven D. Eppinger. “Modeling Impacts of Process Architecture on Cost and Schedule Risk in Product Development.” IEEE...2009. Clark, Kim, and Steven Wheelwright. Revolutionizing Development: Quantum Leaps in Speed, Efficiency and Quality. New York, NY: The Free Press...1992. Cross, Steven M. Data Analysis and its Impact on Predicting Schedule and Cost Risk. AFIT/GIR/ENC/06M-01. Wright-Patterson AFB OH: AFIT
Expert system for on-board satellite scheduling and control
NASA Technical Reports Server (NTRS)
Barry, John M.; Sary, Charisse
1988-01-01
An Expert System is described which Rockwell Satellite and Space Electronics Division (S&SED) is developing to dynamically schedule the allocation of on-board satellite resources and activities. This expert system is the Satellite Controller. The resources to be scheduled include power, propellant and recording tape. The activities controlled include scheduling satellite functions such as sensor checkout and operation. The scheduling of these resources and activities is presently a labor intensive and time consuming ground operations task. Developing a schedule requires extensive knowledge of the system and subsystems operations, operational constraints, and satellite design and configuration. This scheduling process requires highly trained experts anywhere from several hours to several weeks to accomplish. The process is done through brute force, that is examining cryptic mnemonic data off line to interpret the health and status of the satellite. Then schedules are formulated either as the result of practical operator experience or heuristics - that is rules of thumb. Orbital operations must become more productive in the future to reduce life cycle costs and decrease dependence on ground control. This reduction is required to increase autonomy and survivability of future systems. The design of future satellites require that the scheduling function be transferred from ground to on board systems.
Production Planning and Planting Pattern Scheduling Information System for Horticulture
NASA Astrophysics Data System (ADS)
Vitadiar, Tanhella Zein; Farikhin; Surarso, Bayu
2018-02-01
This paper present the production of planning and planting pattern scheduling faced by horticulture farmer using two methods. Fuzzy time series method use to predict demand on based on sales amount, while linear programming is used to assist horticulture farmers in making production planning decisions and determining the schedule of cropping patterns in accordance with demand predictions of the fuzzy time series method, variable use in this paper is size of areas, production advantage, amount of seeds and age of the plants. This research result production planning and planting patterns scheduling information system with the output is recommendations planting schedule, harvest schedule and the number of seeds will be plant.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-25
... Network A and Network B data feeds. Consistent with current practice, within each of a firm's billable... fee schedules by compressing the current 14-tier Network A device rate schedule into four tiers, by... products, unprecedented levels of trading, internationalization and developments in portfolio analysis and...
One for All: Maintaining a Single Schedule Database for Large Development Projects
NASA Technical Reports Server (NTRS)
Hilscher, R.; Howerton, G.
1999-01-01
Efficiently maintaining and controlling a single schedule database in an Integrated Product Team environment is a significant challenge. It's accomplished effectively with the right combination of tools, skills, strategy, creativity, and teamwork. We'll share our lessons learned maintaining a 20,000 plus task network on a 36 month project.
15 CFR 712.4 - New Schedule 1 production facility.
Code of Federal Regulations, 2010 CFR
2010-01-01
... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.4 New Schedule 1 production facility. (a) Establishment of a...) of the CWCR, and you intend to begin production of Schedule 1 chemicals at your facility in...
15 CFR 712.4 - New Schedule 1 production facility.
Code of Federal Regulations, 2011 CFR
2011-01-01
... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.4 New Schedule 1 production facility. (a) Establishment of a...) of the CWCR, and you intend to begin production of Schedule 1 chemicals at your facility in...
Code of Federal Regulations, 2011 CFR
2011-01-01
... COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS § 714.3 Advance declaration requirements for additionally planned production of Schedule 3 chemicals. (a) Declaration... additionally planned production of Schedule 3 chemicals. 714.3 Section 714.3 Commerce and Foreign Trade...
Pitch Guidance Optimization for the Orion Abort Flight Tests
NASA Technical Reports Server (NTRS)
Stillwater, Ryan Allanque
2010-01-01
The National Aeronautics and Space Administration created the Constellation program to develop the next generation of manned space vehicles and launch vehicles. The Orion abort system is initiated in the event of an unsafe condition during launch. The system has a controller gains schedule that can be tuned to reduce the attitude errors between the simulated Orion abort trajectories and the guidance trajectory. A program was created that uses the method of steepest descent to tune the pitch gains schedule by an automated procedure. The gains schedule optimization was applied to three potential abort scenarios; each scenario tested using the optimized gains schedule resulted in reduced attitude errors when compared to the Orion production gains schedule.
A new technology for manufacturing scheduling derived from space system operations
NASA Technical Reports Server (NTRS)
Hornstein, R. S.; Willoughby, J. K.
1993-01-01
A new technology for producing finite capacity schedules has been developed in response to complex requirements for operating space systems such as the Space Shuttle, the Space Station, and the Deep Space Network for telecommunications. This technology has proven its effectiveness in manufacturing environments where popular scheduling techniques associated with Materials Resources Planning (MRPII) and with factory simulation are not adequate for shop-floor work planning and control. The technology has three components. The first is a set of data structures that accommodate an extremely general description of a factory's resources, its manufacturing activities, and the constraints imposed by the environment. The second component is a language and set of software utilities that enable a rapid synthesis of functional capabilities. The third component is an algorithmic architecture called the Five Ruleset Model which accommodates the unique needs of each factory. Using the new technology, systems can model activities that generate, consume, and/or obligate resources. This allows work-in-process (WIP) to be generated and used; it permits constraints to be imposed or intermediate as well as finished goods inventories. It is also possible to match as closely as possible both the current factory state and future conditions such as promise dates. Schedule revisions can be accommodated without impacting the entire production schedule. Applications have been successful in both discrete and process manufacturing environments. The availability of a high-quality finite capacity production planning capability enhances the data management capabilities of MRP II systems. These schedules can be integrated with shop-floor data collection systems and accounting systems. Using the new technology, semi-custom systems can be developed at costs that are comparable to products that do not have equivalent functional capabilities and/or extensibility.
NASA Technical Reports Server (NTRS)
Larsen, D. Gail; Schwieder, Paul R.
1993-01-01
Network video conferencing is advancing rapidly throughout the nation, and the Idaho National Engineering Laboratory (INEL), a Department of Energy (DOE) facility, is at the forefront of the development. Engineers at INEL/EG&G designed and installed a very unique DOE videoconferencing system, offering many outstanding features, that include true multipoint conferencing, user-friendly design and operation with no full-time operators required, and the potential for cost effective expansion of the system. One area where INEL/EG&G engineers made a significant contribution to video conferencing was in the development of effective, user-friendly, end station driven scheduling software. A PC at each user site is used to schedule conferences via a windows package. This software interface provides information to the users concerning conference availability, scheduling, initiation, and termination. The menus are 'mouse' controlled. Once a conference is scheduled, a workstation at the hubs monitors the network to initiate all scheduled conferences. No active operator participation is required once a user schedules a conference through the local PC; the workstation automatically initiates and terminates the conference as scheduled. As each conference is scheduled, hard copy notification is also printed at each participating site. Video conferencing is the wave of the future. The use of these user-friendly systems will save millions in lost productivity and travel cost throughout the nation. The ease of operation and conference scheduling will play a key role on the extent industry uses this new technology. The INEL/EG&G has developed a prototype scheduling system for both commercial and federal government use.
NASA Astrophysics Data System (ADS)
Larsen, D. Gail; Schwieder, Paul R.
1993-02-01
Network video conferencing is advancing rapidly throughout the nation, and the Idaho National Engineering Laboratory (INEL), a Department of Energy (DOE) facility, is at the forefront of the development. Engineers at INEL/EG&G designed and installed a very unique DOE videoconferencing system, offering many outstanding features, that include true multipoint conferencing, user-friendly design and operation with no full-time operators required, and the potential for cost effective expansion of the system. One area where INEL/EG&G engineers made a significant contribution to video conferencing was in the development of effective, user-friendly, end station driven scheduling software. A PC at each user site is used to schedule conferences via a windows package. This software interface provides information to the users concerning conference availability, scheduling, initiation, and termination. The menus are 'mouse' controlled. Once a conference is scheduled, a workstation at the hubs monitors the network to initiate all scheduled conferences. No active operator participation is required once a user schedules a conference through the local PC; the workstation automatically initiates and terminates the conference as scheduled. As each conference is scheduled, hard copy notification is also printed at each participating site. Video conferencing is the wave of the future. The use of these user-friendly systems will save millions in lost productivity and travel cost throughout the nation. The ease of operation and conference scheduling will play a key role on the extent industry uses this new technology. The INEL/EG&G has developed a prototype scheduling system for both commercial and federal government use.
NASA Astrophysics Data System (ADS)
Larsen, D. G.; Schwieder, P. R.
Network video conferencing is advancing rapidly throughout the nation, and the Idaho National Engineering Laboratory (INEL), a Department of Energy (DOE) facility, is at the forefront of the development. Engineers at INEL/EG&G designed and installed a very unique DOE video conferencing system, offering many outstanding features, that include true multipoint conferencing, user-friendly design and operation with no full-time operators required, and the potential for cost effective expansion of the system. One area where INEL/EG&G engineers made a significant contribution to video conferencing was in the development of effective, user-friendly, end station driven scheduling software. A PC at each user site is used to schedule conferences via a windows package. This software interface provides information to the users concerning conference availability, scheduling, initiation, and termination. The menus are 'mouse' controlled. Once a conference is scheduled, a workstation at the hub monitors the network to initiate all scheduled conferences. No active operator participation is required once a user schedules a conference through the local PC; the workstation automatically initiates and terminates the conference as scheduled. As each conference is scheduled, hard copy notification is also printed at each participating site. Video conferencing is the wave of the future. The use of these user-friendly systems will save millions in lost productivity and travel costs throughout the nation. The ease of operation and conference scheduling will play a key role on the extent industry uses this new technology. The INEL/EG&G has developed a prototype scheduling system for both commercial and federal government use.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Russell, J.S.
Several factors in the development of the East Wilmington oil field by THUMS Long Beach Co. are described. These include: critical path scheduling, complex stratigraphy, reservoir engineering, drilling program, production methods, pressure maintenance, crude oil processing, automation, transportation facilities, service lines, and electrical facilities. The complexity and closely scheduled operational events interwoven in the THUMS project demands a method for the carefully planned sequence of jobs to be done, beginning with island construction up through routine production and to the LACT system. These demanding requirements necessitated the use of a critical path scheduling program. It was decided to use themore » program evaluation technique. This technique is used to assign responsibilities for individual assignments to time assignments, and to keep the overall program on schedule. The stratigraphy of East Wilmington complicates all engineering functions associated with recovery methods and reservoir evaluation. At least 5 major faults are anticipated.« less
NASA Technical Reports Server (NTRS)
Bonine, Lauren
2015-01-01
The presentation provides insight into the schedule risk analysis process used by the Stratospheric Aerosol and Gas Experiment III on the International Space Station Project. The presentation focuses on the schedule risk analysis process highlighting the methods for identification of risk inputs, the inclusion of generic risks identified outside the traditional continuous risk management process, and the development of tailored analysis products used to improve risk informed decision making.
NASA Astrophysics Data System (ADS)
Katchasuwanmanee, Kanet; Cheng, Kai; Bateman, Richard
2016-09-01
As energy efficiency is one of the key essentials towards sustainability, the development of an energy-resource efficient manufacturing system is among the great challenges facing the current industry. Meanwhile, the availability of advanced technological innovation has created more complex manufacturing systems that involve a large variety of processes and machines serving different functions. To extend the limited knowledge on energy-efficient scheduling, the research presented in this paper attempts to model the production schedule at an operation process by considering the balance of energy consumption reduction in production, production work flow (productivity) and quality. An innovative systematic approach to manufacturing energy-resource efficiency is proposed with the virtual simulation as a predictive modelling enabler, which provides real-time manufacturing monitoring, virtual displays and decision-makings and consequentially an analytical and multidimensional correlation analysis on interdependent relationships among energy consumption, work flow and quality errors. The regression analysis results demonstrate positive relationships between the work flow and quality errors and the work flow and energy consumption. When production scheduling is controlled through optimization of work flow, quality errors and overall energy consumption, the energy-resource efficiency can be achieved in the production. Together, this proposed multidimensional modelling and analysis approach provides optimal conditions for the production scheduling at the manufacturing system by taking account of production quality, energy consumption and resource efficiency, which can lead to the key competitive advantages and sustainability of the system operations in the industry.
Treatment for Acquired Apraxia of Speech: Examination of Treatment Intensity and Practice Schedule
ERIC Educational Resources Information Center
Wambaugh, Julie L.; Nessler, Christina; Cameron, Rosalea; Mauszycki, Shannon C.
2013-01-01
Purpose: The authors designed this investigation to extend the development of a treatment for acquired apraxia of speech (AOS)--sound production treatment (SPT)--by examining the effects of 2 treatment intensities and 2 schedules of practice. Method: The authors used a multiple baseline design across participants and behaviors with 4 speakers with…
Kergosien, Y; Tournamille, J-F; Laurence, B; Billaut, J-C
2011-09-01
Chemotherapy drugs are intended for the treatment of cancer. The production of such drugs and their administration to the patient is a delicate and expensive operation. The study deals with the acquisition and processing of data regarding the production of intravenous chemotherapy, from the production request (the medical prescription), the production itself (pharmaceutical process), to the delivery in the health care unit, for the administration of the chemotherapy. The goal of this study is to develop a system that can schedule, control and track the chemotherapy preparations and satisfy a certification process of quality management ("ISO 9001 version 2000" standard). The solution proposed in this paper was developed within the framework of a common certification process at the Biopharmaceutical Unit of the Oncology Clinic (UBCO) of the Bretonneau hospital in Tours (France). The system consists of two software programs: a software to insure traceability and a decision making software to plan the production. To simplify the data entry process, some mobile entry points with bar code reader have been deployed. These tools enable an accurate tracking of the production, a security and control for the schedule production phases, and a full traceability of each operation leading to the administration of the chemotherapy drug. The first result is a software that creates the production schedule, allows a real time control of the production process and a full traceability of each step. Computational experiments are based on real data sets, with a comparison of a time period before and after the implementation of this solution. The results show the positive impacts of this software, like the reduction of delayed deliveries, real time generation of production indicators, optimization of the production and a saving of staff time. This intuitive system guarantees a traceability in connection with a high quality system certified ISO 9001-v2000 (with a rapid data entry), an assistant to schedule the production of preparations in a better way, a permanent follow-up and analysis of operations. This project proves the benefits of implementing computer solutions for the traceability and assistance in decision making in the hospital systems. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.
Multi-objective group scheduling optimization integrated with preventive maintenance
NASA Astrophysics Data System (ADS)
Liao, Wenzhu; Zhang, Xiufang; Jiang, Min
2017-11-01
This article proposes a single-machine-based integration model to meet the requirements of production scheduling and preventive maintenance in group production. To describe the production for identical/similar and different jobs, this integrated model considers the learning and forgetting effects. Based on machine degradation, the deterioration effect is also considered. Moreover, perfect maintenance and minimal repair are adopted in this integrated model. The multi-objective of minimizing total completion time and maintenance cost is taken to meet the dual requirements of delivery date and cost. Finally, a genetic algorithm is developed to solve this optimization model, and the computation results demonstrate that this integrated model is effective and reliable.
48 CFR 538.7001 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... used in this subpart, means Schedule 70 information technology contracts, and Consolidated Products and Services Schedule contracts containing information technology SINs. The Consolidated Products and Services... Purchasing. No other Schedules, or SINs, containing information technology outside of Schedule 70 SINs, and...
48 CFR 538.7001 - Definitions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... used in this subpart, means Schedule 70 information technology contracts, and Consolidated Products and Services Schedule contracts containing information technology SINs. The Consolidated Products and Services... Purchasing. No other Schedules, or SINs, containing information technology outside of Schedule 70 SINs, and...
48 CFR 538.7001 - Definitions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... used in this subpart, means Schedule 70 information technology contracts, and Consolidated Products and Services Schedule contracts containing information technology SINs. The Consolidated Products and Services... Purchasing. No other Schedules, or SINs, containing information technology outside of Schedule 70 SINs, and...
48 CFR 538.7001 - Definitions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... used in this subpart, means Schedule 70 information technology contracts, and Consolidated Products and Services Schedule contracts containing information technology SINs. The Consolidated Products and Services... Purchasing. No other Schedules, or SINs, containing information technology outside of Schedule 70 SINs, and...
48 CFR 538.7001 - Definitions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... used in this subpart, means Schedule 70 information technology contracts, and Consolidated Products and Services Schedule contracts containing information technology SINs. The Consolidated Products and Services... Purchasing. No other Schedules, or SINs, containing information technology outside of Schedule 70 SINs, and...
Space Technology Mission Directorate: Game Changing Development
NASA Technical Reports Server (NTRS)
Gaddis, Stephen W.
2015-01-01
NASA and the aerospace community have deep roots in manufacturing technology and innovation. Through it's Game Changing Development Program and the Advanced Manufacturing Technology Project NASA develops and matures innovative, low-cost manufacturing processes and products. Launch vehicle propulsion systems are a particular area of interest since they typically comprise a large percentage of the total vehicle cost and development schedule. NASA is currently working to develop and utilize emerging technologies such as additive manufacturing (i.e. 3D printing) and computational materials and processing tools that could dramatically improve affordability, capability, and reduce schedule for rocket propulsion hardware.
48 CFR 5152.208-9001 - Industrial preparedness planning.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Production Planning Schedules during active production of the item and for a period of (negotiated number... Government's dependence upon the Production Planning Schedules as a basis to take appropriate measures to... intention to convert Production Planning Schedule to contracts on a selective basis, as may be required to...
48 CFR 5152.208-9001 - Industrial preparedness planning.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Production Planning Schedules during active production of the item and for a period of (negotiated number... Government's dependence upon the Production Planning Schedules as a basis to take appropriate measures to... intention to convert Production Planning Schedule to contracts on a selective basis, as may be required to...
48 CFR 5152.208-9001 - Industrial preparedness planning.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Production Planning Schedules during active production of the item and for a period of (negotiated number... Government's dependence upon the Production Planning Schedules as a basis to take appropriate measures to... intention to convert Production Planning Schedule to contracts on a selective basis, as may be required to...
48 CFR 5152.208-9001 - Industrial preparedness planning.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Production Planning Schedules during active production of the item and for a period of (negotiated number... Government's dependence upon the Production Planning Schedules as a basis to take appropriate measures to... intention to convert Production Planning Schedule to contracts on a selective basis, as may be required to...
Code of Federal Regulations, 2013 CFR
2013-01-01
... a Schedule 3 chemical above the declaration threshold; (ii) You plan to produce at a plant declared...; (iii) You plan to increase the production of a Schedule 3 chemical by declared plants on your plant... production of a Schedule 3 chemical at a declared plant site to an amount above the upper limit of the range...
Code of Federal Regulations, 2012 CFR
2012-01-01
... a Schedule 3 chemical above the declaration threshold; (ii) You plan to produce at a plant declared...; (iii) You plan to increase the production of a Schedule 3 chemical by declared plants on your plant... production of a Schedule 3 chemical at a declared plant site to an amount above the upper limit of the range...
Code of Federal Regulations, 2014 CFR
2014-01-01
... a Schedule 3 chemical above the declaration threshold; (ii) You plan to produce at a plant declared...; (iii) You plan to increase the production of a Schedule 3 chemical by declared plants on your plant... production of a Schedule 3 chemical at a declared plant site to an amount above the upper limit of the range...
HURON (HUman and Robotic Optimization Network) Multi-Agent Temporal Activity Planner/Scheduler
NASA Technical Reports Server (NTRS)
Hua, Hook; Mrozinski, Joseph J.; Elfes, Alberto; Adumitroaie, Virgil; Shelton, Kacie E.; Smith, Jeffrey H.; Lincoln, William P.; Weisbin, Charles R.
2012-01-01
HURON solves the problem of how to optimize a plan and schedule for assigning multiple agents to a temporal sequence of actions (e.g., science tasks). Developed as a generic planning and scheduling tool, HURON has been used to optimize space mission surface operations. The tool has also been used to analyze lunar architectures for a variety of surface operational scenarios in order to maximize return on investment and productivity. These scenarios include numerous science activities performed by a diverse set of agents: humans, teleoperated rovers, and autonomous rovers. Once given a set of agents, activities, resources, resource constraints, temporal constraints, and de pendencies, HURON computes an optimal schedule that meets a specified goal (e.g., maximum productivity or minimum time), subject to the constraints. HURON performs planning and scheduling optimization as a graph search in state-space with forward progression. Each node in the graph contains a state instance. Starting with the initial node, a graph is automatically constructed with new successive nodes of each new state to explore. The optimization uses a set of pre-conditions and post-conditions to create the children states. The Python language was adopted to not only enable more agile development, but to also allow the domain experts to easily define their optimization models. A graphical user interface was also developed to facilitate real-time search information feedback and interaction by the operator in the search optimization process. The HURON package has many potential uses in the fields of Operations Research and Management Science where this technology applies to many commercial domains requiring optimization to reduce costs. For example, optimizing a fleet of transportation truck routes, aircraft flight scheduling, and other route-planning scenarios involving multiple agent task optimization would all benefit by using HURON.
ERIC Educational Resources Information Center
Hughes, Norm
The Distance Education Center (DEC) of the University of Southern Queensland (Australia) has developed a unique materials database system which is used to monitor pre-production, design and development, production and post-production planning, scheduling, and distribution of all types of materials including courses offered only on the Internet. In…
Scheduling algorithms for automatic control systems for technological processes
NASA Astrophysics Data System (ADS)
Chernigovskiy, A. S.; Tsarev, R. Yu; Kapulin, D. V.
2017-01-01
Wide use of automatic process control systems and the usage of high-performance systems containing a number of computers (processors) give opportunities for creation of high-quality and fast production that increases competitiveness of an enterprise. Exact and fast calculations, control computation, and processing of the big data arrays - all of this requires the high level of productivity and, at the same time, minimum time of data handling and result receiving. In order to reach the best time, it is necessary not only to use computing resources optimally, but also to design and develop the software so that time gain will be maximal. For this purpose task (jobs or operations), scheduling techniques for the multi-machine/multiprocessor systems are applied. Some of basic task scheduling methods for the multi-machine process control systems are considered in this paper, their advantages and disadvantages come to light, and also some usage considerations, in case of the software for automatic process control systems developing, are made.
How Home Health Nurses Plan Their Work Schedules: A Qualitative Descriptive Study.
Irani, Elliane; Hirschman, Karen B; Cacchione, Pamela Z; Bowles, Kathryn H
2018-06-12
To describe how home health nurses plan their daily work schedules and what challenges they face during the planning process. Home health nurses are viewed as independent providers and value the nature of their work because of the flexibility and autonomy they hold in developing their work schedules. However, there is limited empirical evidence about how home health nurses plan their work schedules, including the factors they consider during the process and the challenges they face within the dynamic home health setting. Qualitative descriptive design. Semi-structured interviews were conducted with 20 registered nurses who had greater than 2 years of experience in home health and were employed by one of the three participating home health agencies in the mid-Atlantic region of the United States. Data were analyzed using conventional content analysis. Four themes emerged about planning work schedules and daily itineraries: identifying patient needs to prioritize visits accordingly, partnering with patients to accommodate their preferences, coordinating visit timing with other providers to avoid overwhelming patients, and working within agency standards to meet productivity requirements. Scheduling challenges included readjusting the schedule based on patient needs and staffing availability, anticipating longer visits, and maintaining continuity of care with patients. Home health nurses make autonomous decisions regarding their work schedules while considering specific patient and agency factors, and overcome challenges related to the unpredictable nature of providing care in a home health setting. Future research is needed to further explore nurse productivity in home health and improve home health work environments. Home health nurses plan their work schedules to provide high quality care that is patient-centered and timely. The findings also highlight organizational priorities to facilitate continuity of care and support nurses while alleviating the burnout associated with high productivity requirements. This article is protected by copyright. All rights reserved. This article is protected by copyright. All rights reserved.
Production scheduling and rescheduling with genetic algorithms.
Bierwirth, C; Mattfeld, D C
1999-01-01
A general model for job shop scheduling is described which applies to static, dynamic and non-deterministic production environments. Next, a Genetic Algorithm is presented which solves the job shop scheduling problem. This algorithm is tested in a dynamic environment under different workload situations. Thereby, a highly efficient decoding procedure is proposed which strongly improves the quality of schedules. Finally, this technique is tested for scheduling and rescheduling in a non-deterministic environment. It is shown by experiment that conventional methods of production control are clearly outperformed at reasonable run-time costs.
9 CFR 592.96 - Schedule of operation of official plants.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Schedule of operation of official plants. 592.96 Section 592.96 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Performance of Services § 592.96 Schedule of operation of official plant...
9 CFR 592.96 - Schedule of operation of official plants.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Schedule of operation of official plants. 592.96 Section 592.96 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Performance of Services § 592.96 Schedule of operation of official plant...
9 CFR 592.96 - Schedule of operation of official plants.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Schedule of operation of official plants. 592.96 Section 592.96 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Performance of Services § 592.96 Schedule of operation of official plant...
9 CFR 592.96 - Schedule of operation of official plants.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Schedule of operation of official plants. 592.96 Section 592.96 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Performance of Services § 592.96 Schedule of operation of official plant...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Schedule of fees for products and services... Procedures for Payment § 1.1182 Schedule of fees for products and services provided by the Commission in connection with competitive bidding procedures. Product or service Fee amount Payment procedure On-line...
The MER/CIP Portal for Ground Operations
NASA Technical Reports Server (NTRS)
Chan, Louise; Desai, Sanjay; DOrtenzio, Matthew; Filman, Robtert E.; Heher, Dennis M.; Hubbard, Kim; Johan, Sandra; Keely, Leslie; Magapu, Vish; Mak, Ronald
2003-01-01
We developed the Mars Exploration Rover/Collaborative Information Portal (MER/CIP) to facilitate MER operations. MER/CIP provides a centralized, one-stop delivery platform integrating science and engineering data from several distributed heterogeneous data sources. Key issues for MER/CIP include: 1) Scheduling and schedule reminders; 2) Tracking the status of daily predicted outputs; 3) Finding and analyzing data products; 4) Collaboration; 5) Announcements; 6) Personalization.
Scheduling optimization of design stream line for production research and development projects
NASA Astrophysics Data System (ADS)
Liu, Qinming; Geng, Xiuli; Dong, Ming; Lv, Wenyuan; Ye, Chunming
2017-05-01
In a development project, efficient design stream line scheduling is difficult and important owing to large design imprecision and the differences in the skills and skill levels of employees. The relative skill levels of employees are denoted as fuzzy numbers. Multiple execution modes are generated by scheduling different employees for design tasks. An optimization model of a design stream line scheduling problem is proposed with the constraints of multiple executive modes, multi-skilled employees and precedence. The model considers the parallel design of multiple projects, different skills of employees, flexible multi-skilled employees and resource constraints. The objective function is to minimize the duration and tardiness of the project. Moreover, a two-dimensional particle swarm algorithm is used to find the optimal solution. To illustrate the validity of the proposed method, a case is examined in this article, and the results support the feasibility and effectiveness of the proposed model and algorithm.
Research on crude oil storage and transportation based on optimization algorithm
NASA Astrophysics Data System (ADS)
Yuan, Xuhua
2018-04-01
At present, the optimization theory and method have been widely used in the optimization scheduling and optimal operation scheme of complex production systems. Based on C++Builder 6 program development platform, the theoretical research results are implemented by computer. The simulation and intelligent decision system of crude oil storage and transportation inventory scheduling are designed. The system includes modules of project management, data management, graphics processing, simulation of oil depot operation scheme. It can realize the optimization of the scheduling scheme of crude oil storage and transportation system. A multi-point temperature measuring system for monitoring the temperature field of floating roof oil storage tank is developed. The results show that by optimizing operating parameters such as tank operating mode and temperature, the total transportation scheduling costs of the storage and transportation system can be reduced by 9.1%. Therefore, this method can realize safe and stable operation of crude oil storage and transportation system.
USDA-ARS?s Scientific Manuscript database
A scheduled process developed for manufacture of acidified foods must be validated with data from existing literature or from a product-specific challenge study, either of which can establish both safety and shelf stability. The challenge study would evaluate the ability of a particular food product...
15 CFR Supplement No. 2 to Part 710 - Definitions of Production
Code of Federal Regulations, 2011 CFR
2011-01-01
... Supplement No. 2 to Part 710—Definitions of Production Schedule 1 chemicals Schedule 2 and Schedule 3... 15 Commerce and Foreign Trade 2 2011-01-01 2011-01-01 false Definitions of Production No... (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS...
Optimization-based manufacturing scheduling with multiple resources and setup requirements
NASA Astrophysics Data System (ADS)
Chen, Dong; Luh, Peter B.; Thakur, Lakshman S.; Moreno, Jack, Jr.
1998-10-01
The increasing demand for on-time delivery and low price forces manufacturer to seek effective schedules to improve coordination of multiple resources and to reduce product internal costs associated with labor, setup and inventory. This study describes the design and implementation of a scheduling system for J. M. Product Inc. whose manufacturing is characterized by the need to simultaneously consider machines and operators while an operator may attend several operations at the same time, and the presence of machines requiring significant setup times. The scheduling problem with these characteristics are typical for many manufacturers, very difficult to be handled, and have not been adequately addressed in the literature. In this study, both machine and operators are modeled as resources with finite capacities to obtain efficient coordination between them, and an operator's time can be shared by several operations at the same time to make full use of the operator. Setups are explicitly modeled following our previous work, with additional penalties on excessive setups to reduce setup costs and avoid possible scraps. An integer formulation with a separable structure is developed to maximize on-time delivery of products, low inventory and small number of setups. Within the Lagrangian relaxation framework, the problem is decomposed into individual subproblems that are effectively solved by using dynamic programming with additional penalties embedded in state transitions. Heuristics is then developed to obtain a feasible schedule following on our previous work with new mechanism to satisfy operator capacity constraints. The method has been implemented using the object-oriented programming language C++ with a user-friendly interface, and numerical testing shows that the method generates high quality schedules in a timely fashion. Through simultaneous consideration of machines and operators, machines and operators are well coordinated to facilitate the smooth flow of parts through the system. The explicit modeling of setups and the associated penalties let parts with same setup requirements clustered together to avoid excessive setups.
21 CFR 1310.16 - Exemptions for certain scheduled listed chemical products.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Exemptions for certain scheduled listed chemical... RECORDS AND REPORTS OF LISTED CHEMICALS AND CERTAIN MACHINES § 1310.16 Exemptions for certain scheduled listed chemical products. (a) Upon the application of a manufacturer of a scheduled listed chemical...
Building CHAOS: An Operating System for Livermore Linux Clusters
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garlick, J E; Dunlap, C M
2003-02-21
The Livermore Computing (LC) Linux Integration and Development Project (the Linux Project) produces and supports the Clustered High Availability Operating System (CHAOS), a cluster operating environment based on Red Hat Linux. Each CHAOS release begins with a set of requirements and ends with a formally tested, packaged, and documented release suitable for use on LC's production Linux clusters. One characteristic of CHAOS is that component software packages come from different sources under varying degrees of project control. Some are developed by the Linux Project, some are developed by other LC projects, some are external open source projects, and some aremore » commercial software packages. A challenge to the Linux Project is to adhere to release schedules and testing disciplines in a diverse, highly decentralized development environment. Communication channels are maintained for externally developed packages in order to obtain support, influence development decisions, and coordinate/understand release schedules. The Linux Project embraces open source by releasing locally developed packages under open source license, by collaborating with open source projects where mutually beneficial, and by preferring open source over proprietary software. Project members generally use open source development tools. The Linux Project requires system administrators and developers to work together to resolve problems that arise in production. This tight coupling of production and development is a key strategy for making a product that directly addresses LC's production requirements. It is another challenge to balance support and development activities in such a way that one does not overwhelm the other.« less
United Arab Emirates expansion curtailed but production still exceeds quota
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vielvoye, R.
1987-08-24
This article reports that oil and gas activity in the United Arab Emirates has been hit be declining exploration, curtailed development schedules, and the shutdown of production facilities. But despite a mothballing program, production is still running way ahead of the quota set by OPEC for the UAE. According to OPEC's schedule, first half 1987 production should not have exceeded 902,000 b/d. And the increased quotas for the second half of the year would permit output to average 948,000 b/d. But production averaged 1.2 million b/d during the first half of the year, and there is no sign of amore » significant reduction. Rising output when most other OPEC members are attempting to discipline themselves stems from the failure of Abu Dhabi and Dubai to agree on how the quota should be split. Details are provided on the regions of production activity.« less
Proposal of Heuristic Algorithm for Scheduling of Print Process in Auto Parts Supplier
NASA Astrophysics Data System (ADS)
Matsumoto, Shimpei; Okuhara, Koji; Ueno, Nobuyuki; Ishii, Hiroaki
We are interested in the print process on the manufacturing processes of auto parts supplier as an actual problem. The purpose of this research is to apply our scheduling technique developed in university to the actual print process in mass customization environment. Rationalization of the print process is depending on the lot sizing. The manufacturing lead time of the print process is long, and in the present method, production is done depending on worker’s experience and intuition. The construction of an efficient production system is urgent problem. Therefore, in this paper, in order to shorten the entire manufacturing lead time and to reduce the stock, we reexamine the usual method of the lot sizing rule based on heuristic technique, and we propose the improvement method which can plan a more efficient schedule.
NASA Astrophysics Data System (ADS)
Gilani, Seyed-Omid; Sattarvand, Javad
2016-02-01
Meeting production targets in terms of ore quantity and quality is critical for a successful mining operation. In-situ grade uncertainty causes both deviations from production targets and general financial deficits. A new stochastic optimization algorithm based on ant colony optimization (ACO) approach is developed herein to integrate geological uncertainty described through a series of the simulated ore bodies. Two different strategies were developed based on a single predefined probability value (Prob) and multiple probability values (Pro bnt) , respectively in order to improve the initial solutions that created by deterministic ACO procedure. Application at the Sungun copper mine in the northwest of Iran demonstrate the abilities of the stochastic approach to create a single schedule and control the risk of deviating from production targets over time and also increase the project value. A comparison between two strategies and traditional approach illustrates that the multiple probability strategy is able to produce better schedules, however, the single predefined probability is more practical in projects requiring of high flexibility degree.
Integrated planning and scheduling for Earth science data processing
NASA Technical Reports Server (NTRS)
Boddy, Mark; White, Jim; Goldman, Robert; Short, Nick, Jr.
1995-01-01
Several current NASA programs such as the EOSDIS Core System (ECS) have data processing and data management requirements that call for an integrated planning and scheduling capability. In this paper, we describe the experience of applying advanced scheduling technology operationally, in terms of what was accomplished, lessons learned, and what remains to be done in order to achieve similar successes in ECS and other programs. We discuss the importance and benefits of advanced scheduling tools, and our progress toward realizing them, through examples and illustrations based on ECS requirements. The first part of the paper focuses on the Data Archive and Distribution (DADS) V0 Scheduler. We then discuss system integration issues ranging from communication with the scheduler to the monitoring of system events and re-scheduling in response to them. The challenge of adapting the scheduler to domain-specific features and scheduling policies is also considered. Extrapolation to the ECS domain raises issues of integrating scheduling with a product-generation planner (such as PlaSTiC), and implementing conditional planning in an operational system. We conclude by briefly noting ongoing technology development and deployment projects being undertaken by HTC and the ISTB.
The human factors of implementing shift work in logging operations.
Mitchell, D L; Gallagher, T V; Thomas, R E
2008-10-01
A fairly recent development in the forest industry is the use of shift work in logging in the southeastern U.S. Logging company owners are implementing shift work as an opportunity to increase production and potentially reduce the cost of producing each unit of wood, without consideration of the potential impacts on the logging crew. There are many documented physiological and psychological impacts on workers from shift work in a variety of industries, although few address forestry workers in the U.S. Semi-structured interviews were performed to gather information about how logging company owners were implementing shift work in seven southeastern states. Data collected during the interviews included employee turnover, shift hours, shift scheduling, safety considerations, and production impacts. Various work schedules were employed. The majority of the schedules encompassed less than 24 hours per day. Permanent and rotating shift schedules were found. None of the logging company owners used more than two crews in a 24-hour period. Additional safety precautions were implemented as a result of working after dark. No in-woods worker accidents or injuries were reported by any of those interviewed. Results indicate that a variety of work schedules can be successfully implemented in the southeastern logging industry.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Phaseout Schedule for Production of Ozone-Depleting Substances H Appendix H to Subpart A of Part 82... STRATOSPHERIC OZONE Production and Consumption Controls Pt. 82, Subpt. A, App. H Appendix H to Subpart A of Part 82—Clean Air Act Amendments of 1990 Phaseout Schedule for Production of Ozone-Depleting Substances...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Phaseout Schedule for Production of Ozone-Depleting Substances H Appendix H to Subpart A of Part 82... STRATOSPHERIC OZONE Production and Consumption Controls Pt. 82, Subpt. A, App. H Appendix H to Subpart A of Part 82—Clean Air Act Amendments of 1990 Phaseout Schedule for Production of Ozone-Depleting Substances...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Phaseout Schedule for Production of Ozone-Depleting Substances H Appendix H to Subpart A of Part 82... STRATOSPHERIC OZONE Production and Consumption Controls Pt. 82, Subpt. A, App. H Appendix H to Subpart A of Part 82—Clean Air Act Amendments of 1990 Phaseout Schedule for Production of Ozone-Depleting Substances...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Phaseout Schedule for Production of Ozone-Depleting Substances H Appendix H to Subpart A of Part 82... STRATOSPHERIC OZONE Production and Consumption Controls Pt. 82, Subpt. A, App. H Appendix H to Subpart A of Part 82—Clean Air Act Amendments of 1990 Phaseout Schedule for Production of Ozone-Depleting Substances...
The Framework for Life Cycle Cost Management,
1982-01-01
in the early phases of system development before full- scale development and initial production, O&S cost projections are too un- certain to...Ensure that each increment of cost and schedule investment in R&M contributes significantly to the above objectives. DoDD 5000.40, Reliability and...Major systems are characterized by large investments of time and resources in the uncertain periods of development, production, and deployment and in
Cost and schedule analytical techniques development
NASA Technical Reports Server (NTRS)
1994-01-01
This contract provided technical services and products to the Marshall Space Flight Center's Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) for the period of 3 Aug. 1991 - 30 Nov. 1994. Accomplishments summarized cover the REDSTAR data base, NASCOM hard copy data base, NASCOM automated data base, NASCOM cost model, complexity generators, program planning, schedules, NASA computer connectivity, other analytical techniques, and special project support.
NASA management of the Space Shuttle Program
NASA Technical Reports Server (NTRS)
Peters, F.
1975-01-01
The management system and management technology described have been developed to meet stringent cost and schedule constraints of the Space Shuttle Program. Management of resources available to this program requires control and motivation of a large number of efficient creative personnel trained in various technical specialties. This must be done while keeping track of numerous parallel, yet interdependent activities involving different functions, organizations, and products all moving together in accordance with intricate plans for budgets, schedules, performance, and interaction. Some techniques developed to identify problems at an early stage and seek immediate solutions are examined.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-05
... 17 of the Fees Schedule. In addition, the existing index license surcharge fees and product research... Primary/Agency Order, a contra order, or a response. The index license surcharge fees and product research... MDX, NDX, and RUT; and product research and development surcharge fees of $0.10 per contract for GVZ...
Code of Federal Regulations, 2013 CFR
2013-01-01
...)(2) of this section if you produced at your facility in excess of 100 grams aggregate of Schedule 1... you will produce at your facility more than 100 grams aggregate of Schedule 1 chemicals in the next... result in production of more than 100 grams aggregate of Schedule 1 chemicals. (b) Declaration forms to...
Code of Federal Regulations, 2011 CFR
2011-01-01
...)(2) of this section if you produced at your facility in excess of 100 grams aggregate of Schedule 1... you will produce at your facility more than 100 grams aggregate of Schedule 1 chemicals in the next... result in production of more than 100 grams aggregate of Schedule 1 chemicals. (b) Declaration forms to...
Code of Federal Regulations, 2014 CFR
2014-01-01
...)(2) of this section if you produced at your facility in excess of 100 grams aggregate of Schedule 1... you will produce at your facility more than 100 grams aggregate of Schedule 1 chemicals in the next... result in production of more than 100 grams aggregate of Schedule 1 chemicals. (b) Declaration forms to...
Operating the production calculus: ordering a production system in the print industry.
Button, Graham; Sharrock, Wes
2002-06-01
The topic of shop-floor work has been extensively examined within sociology. However, the organizational structures within which this work takes place have, in the most part, been taken as unexamined givens. Yet, their operation is also the shop-floor work of some people. This paper examines the way in which the stable organizational structures within which shop-floor work takes place are achieved. It is based upon a fieldwork investigation of a large commercial printer and focuses upon the collaborative work of those who are involved in scheduling the production of a job and their use of 'the production calculus' in planning the work of the site. The print industry is undergoing considerable technological change and scheduling technologies have been developed to automate this work. However, there has been little take up of these technologies and the paper also considers how the characteristics of operating the production calculus in practice may account for this.
Fabrication of seamless calandria tubes by cold pilgering route using 3-pass and 2-pass schedules
NASA Astrophysics Data System (ADS)
Saibaba, N.
2008-12-01
Calandria tube is a large diameter, extremely thin walled zirconium alloy tube which has diameter to wall thickness ratio as high as 90-95. Such tubes are conventionally produced by the 'welded route', which involves extrusion of slabs followed by a series of hot and cold rolling passes, intermediate anneals, press forming of sheets into circular shape and closing the gap by TIG welding. Though pilgering is a well established process for the fabrication of seamless tubes, production of extremely thin walled tubes offers several challenges during pilgering. Nuclear fuel complex (NFC), Hyderabad, has successfully developed a process for the production of Zircaloy-4 calandria tubes by adopting the 'seamless route' which involves hot extrusion of mother blanks followed by three-pass pilgering or two-pass pilgering schedules. This paper deals with standardization of the seamless route processes for fabrication of calandria tubes, comparison between the tubes produced by 2-pass and 3-pass pilgering schedules, role of ultrasonic test charts for control of process parameters, development of new testing methods for burst testing and other properties.
NASA Technical Reports Server (NTRS)
Hamazaki, Takashi
1992-01-01
This paper describes an architecture for realizing high quality production schedules. Although quality is one of the most important aspects of production scheduling, it is difficult, even for a user, to specify precisely. However, it is also true that the decision as to whether a scheduler is good or bad can only be made by the user. This paper proposes the following: (1) the quality of a schedule can be represented in the form of quality factors, i.e. constraints and objectives of the domain, and their structure; (2) quality factors and their structure can be used for decision making at local decision points during the scheduling process; and (3) that they can be defined via iteration of user specification processes.
A Study on Real-Time Scheduling Methods in Holonic Manufacturing Systems
NASA Astrophysics Data System (ADS)
Iwamura, Koji; Taimizu, Yoshitaka; Sugimura, Nobuhiro
Recently, new architectures of manufacturing systems have been proposed to realize flexible control structures of the manufacturing systems, which can cope with the dynamic changes in the volume and the variety of the products and also the unforeseen disruptions, such as failures of manufacturing resources and interruptions by high priority jobs. They are so called as the autonomous distributed manufacturing system, the biological manufacturing system and the holonic manufacturing system. Rule-based scheduling methods were proposed and applied to the real-time production scheduling problems of the HMS (Holonic Manufacturing System) in the previous report. However, there are still remaining problems from the viewpoint of the optimization of the whole production schedules. New procedures are proposed, in the present paper, to select the production schedules, aimed at generating effective production schedules in real-time. The proposed methods enable the individual holons to select suitable machining operations to be carried out in the next time period. Coordination process among the holons is also proposed to carry out the coordination based on the effectiveness values of the individual holons.
Concurrent Software Engineering Project
ERIC Educational Resources Information Center
Stankovic, Nenad; Tillo, Tammam
2009-01-01
Concurrent engineering or overlapping activities is a business strategy for schedule compression on large development projects. Design parameters and tasks from every aspect of a product's development process and their interdependencies are overlapped and worked on in parallel. Concurrent engineering suffers from negative effects such as excessive…
48 CFR 42.302 - Contract administration functions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... delivery schedules. (32) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors... performance in the areas of design, development, and production. (41) Evaluate for adequacy and perform surveillance of contractor engineering efforts and management systems that relate to design, development...
Leadership Development Program Final Project
NASA Technical Reports Server (NTRS)
Parrish, Teresa C.
2016-01-01
TOSC is NASA's prime contractor tasked to successfully assemble, test, and launch the EM1 spacecraft. TOSC success is highly dependent on design products from the other NASA Programs manufacturing and delivering the flight hardware; Space Launch System(SLS) and Multi-Purpose Crew Vehicle(MPCV). Design products directly feed into TOSC's: Procedures, Personnel training, Hardware assembly, Software development, Integrated vehicle test and checkout, Launch. TOSC senior management recognized a significant schedule risk as these products are still being developed by the other two (2) programs; SVE and ACE positions were created.
Car painting process scheduling with harmony search algorithm
NASA Astrophysics Data System (ADS)
Syahputra, M. F.; Maiyasya, A.; Purnamawati, S.; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.
2018-02-01
Automotive painting program in the process of painting the car body by using robot power, making efficiency in the production system. Production system will be more efficient if pay attention to scheduling of car order which will be done by considering painting body shape of car. Flow shop scheduling is a scheduling model in which the job-job to be processed entirely flows in the same product direction / path. Scheduling problems often arise if there are n jobs to be processed on the machine, which must be specified which must be done first and how to allocate jobs on the machine to obtain a scheduled production process. Harmony Search Algorithm is a metaheuristic optimization algorithm based on music. The algorithm is inspired by observations that lead to music in search of perfect harmony. This musical harmony is in line to find optimal in the optimization process. Based on the tests that have been done, obtained the optimal car sequence with minimum makespan value.
NASA Astrophysics Data System (ADS)
Mirabi, Mohammad; Fatemi Ghomi, S. M. T.; Jolai, F.
2014-04-01
Flow-shop scheduling problem (FSP) deals with the scheduling of a set of n jobs that visit a set of m machines in the same order. As the FSP is NP-hard, there is no efficient algorithm to reach the optimal solution of the problem. To minimize the holding, delay and setup costs of large permutation flow-shop scheduling problems with sequence-dependent setup times on each machine, this paper develops a novel hybrid genetic algorithm (HGA) with three genetic operators. Proposed HGA applies a modified approach to generate a pool of initial solutions, and also uses an improved heuristic called the iterated swap procedure to improve the initial solutions. We consider the make-to-order production approach that some sequences between jobs are assumed as tabu based on maximum allowable setup cost. In addition, the results are compared to some recently developed heuristics and computational experimental results show that the proposed HGA performs very competitively with respect to accuracy and efficiency of solution.
NASA Astrophysics Data System (ADS)
Kuehl, C. Stephen
2003-08-01
Completing its final development and early deployment on the Navy's multi-role aircraft, the F/A-18 E/F Super Hornet, the SHAred Reconnaissance Pod (SHARP) provides the war fighter with the latest digital tactical reconnaissance (TAC Recce) Electro-Optical/Infrared (EO/IR) sensor system. The SHARP program is an evolutionary acquisition that used a spiral development process across a prototype development phase tightly coupled into overlapping Engineering and Manufacturing Development (EMD) and Low Rate Initial Production (LRIP) phases. Under a tight budget environment with a highly compressed schedule, SHARP challenged traditional acquisition strategies and systems engineering (SE) processes. Adopting tailored state-of-the-art systems engineering process models allowd the SHARP program to overcome the technical knowledge transition challenges imposed by a compressed program schedule. The program's original goal was the deployment of digital TAC Recce mission capabilities to the fleet customer by summer of 2003. Hardware and software integration technical challenges resulted from requirements definition and analysis activities performed across a government-industry led Integrated Product Team (IPT) involving Navy engineering and test sites, Boeing, and RTSC-EPS (with its subcontracted hardware and government furnished equipment vendors). Requirements development from a bottoms-up approach was adopted using an electronic requirements capture environment to clarify and establish the SHARP EMD product baseline specifications as relevant technical data became available. Applying Earned-Value Management (EVM) against an Integrated Master Schedule (IMS) resulted in efficiently managing SE task assignments and product deliveries in a dynamically evolving customer requirements environment. Application of Six Sigma improvement methodologies resulted in the uncovering of root causes of errors in wiring interconnectivity drawings, pod manufacturing processes, and avionics requirements specifications. Utilizing the draft NAVAIR SE guideline handbook and the ANSI/EIA-632 standard: Processes for Engineering a System, a systems engineering tailored process approach was adopted for the accelerated SHARP EMD prgram. Tailoring SE processes in this accelerated product delivery environment provided unique opportunities to be technically creative in the establishment of a product performance baseline. This paper provides an historical overview of the systems engineering activities spanning the prototype phase through the EMD SHARP program phase, the performance requirement capture activities and refinement process challenges, and what SE process improvements can be applied to future SHARP-like programs adopting a compressed, evolutionary spiral development acquisition paradigm.
Development of a Gimballed, dual frequency, space-based, microwave antenna for volume production
NASA Technical Reports Server (NTRS)
Leckie, Martin; Laidig, Dave
1996-01-01
A dual-frequency, two-axis Gimballed, Microwave Antenna (GMA) has been developed by COM DEV and Motorola for commercial satellites. The need for volume production of over three hundred antennas at a rate of four per week, a compressed development schedule, and the commercial nature of the effort necessitated a paradigm shift to an 'overall' cost-driven design approach. The translation of these demands into antenna requirements, a description of the resulting GMA design, and examples of development issues are detailed herein.
El Bunduq field ready for start-up. [United Arab Emirates
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1983-10-05
Production is scheduled to restart on the El Bunduq field. The oil field was first brought onstream in 1975 but was shut-in during 1979 due to excessive gas production. Since then, the operator, Bunduq Co., has been developing a $330-million pressure maintenance program to contain gas production and increase oil recovery. While the current field development program is based solely on reserves in the Arab D Formation, the Bunduq Co. has confirmed an oil reservoir in the shallower Arab C Formation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the Product Lists Described Within the Mail Classification Schedule § 3020.50 General. Users of the... product list or the competitive product list appearing in the Mail Classification Schedule. For purposes of this part, modification shall be defined as adding a product to a list, removing a product from a...
Code of Federal Regulations, 2010 CFR
2010-07-01
... the Product Lists Described Within the Mail Classification Schedule § 3020.30 General. The Postal... product list or the competitive product list appearing in the Mail Classification Schedule. For purposes of this part, modification shall be defined as adding a product to a list, removing a product from a...
Code of Federal Regulations, 2011 CFR
2011-07-01
... the Product Lists Described Within the Mail Classification Schedule § 3020.30 General. The Postal... product list or the competitive product list appearing in the Mail Classification Schedule. For purposes of this part, modification shall be defined as adding a product to a list, removing a product from a...
Code of Federal Regulations, 2010 CFR
2010-07-01
... the Product Lists Described Within the Mail Classification Schedule § 3020.50 General. Users of the... product list or the competitive product list appearing in the Mail Classification Schedule. For purposes of this part, modification shall be defined as adding a product to a list, removing a product from a...
Code of Federal Regulations, 2013 CFR
2013-01-01
... plant site is declared for production of a Schedule 3 chemical (and has completed questions 3-3.1 and 3.... (ii) If your plant site is declared for production of a Schedule 3 chemical and you exported or... exports and imports in excess of 30 metric tons of Schedule 3 chemicals. 714.2 Section 714.2 Commerce and...
Code of Federal Regulations, 2012 CFR
2012-01-01
... plant site is declared for production of a Schedule 3 chemical (and has completed questions 3-3.1 and 3.... (ii) If your plant site is declared for production of a Schedule 3 chemical and you exported or... exports and imports in excess of 30 metric tons of Schedule 3 chemicals. 714.2 Section 714.2 Commerce and...
Code of Federal Regulations, 2014 CFR
2014-01-01
... plant site is declared for production of a Schedule 3 chemical (and has completed questions 3-3.1 and 3.... (ii) If your plant site is declared for production of a Schedule 3 chemical and you exported or... exports and imports in excess of 30 metric tons of Schedule 3 chemicals. 714.2 Section 714.2 Commerce and...
Implementation Learning and Forgetting Curve to Scheduling in Garment Industry
NASA Astrophysics Data System (ADS)
Muhamad Badri, Huda; Deros, Baba Md; Syahri, M.; Saleh, Chairul; Fitria, Aninda
2016-02-01
The learning curve shows the relationship between time and the cumulative number of units produced which using the mathematical description on the performance of workers in performing repetitive works. The problems of this study is level differences in the labors performance before and after the break which affects the company's production scheduling. The study was conducted in the garment industry, which the aims is to predict the company production scheduling using the learning curve and forgetting curve. By implementing the learning curve and forgetting curve, this paper contributes in improving the labors performance that is in line with the increase in maximum output 3 hours productive before the break are 15 unit product with learning curve percentage in the company is 93.24%. Meanwhile, the forgetting curve improving maximum output 3 hours productive after the break are 11 unit product with the percentage of forgetting curve in the company is 92.96%. Then, the obtained 26 units product on the productive hours one working day is used as the basic for production scheduling.
48 CFR 1352.271-73 - Schedule of work.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...
48 CFR 1352.271-73 - Schedule of work.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...
48 CFR 1352.271-73 - Schedule of work.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...
48 CFR 1352.271-73 - Schedule of work.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...
48 CFR 1352.271-73 - Schedule of work.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...
Enhanced Software for Scheduling Space-Shuttle Processing
NASA Technical Reports Server (NTRS)
Barretta, Joseph A.; Johnson, Earl P.; Bierman, Rocky R.; Blanco, Juan; Boaz, Kathleen; Stotz, Lisa A.; Clark, Michael; Lebovitz, George; Lotti, Kenneth J.; Moody, James M.;
2004-01-01
The Ground Processing Scheduling System (GPSS) computer program is used to develop streamlined schedules for the inspection, repair, and refurbishment of space shuttles at Kennedy Space Center. A scheduling computer program is needed because space-shuttle processing is complex and it is frequently necessary to modify schedules to accommodate unanticipated events, unavailability of specialized personnel, unexpected delays, and the need to repair newly discovered defects. GPSS implements constraint-based scheduling algorithms and provides an interactive scheduling software environment. In response to inputs, GPSS can respond with schedules that are optimized in the sense that they contain minimal violations of constraints while supporting the most effective and efficient utilization of space-shuttle ground processing resources. The present version of GPSS is a product of re-engineering of a prototype version. While the prototype version proved to be valuable and versatile as a scheduling software tool during the first five years, it was characterized by design and algorithmic deficiencies that affected schedule revisions, query capability, task movement, report capability, and overall interface complexity. In addition, the lack of documentation gave rise to difficulties in maintenance and limited both enhanceability and portability. The goal of the GPSS re-engineering project was to upgrade the prototype into a flexible system that supports multiple- flow, multiple-site scheduling and that retains the strengths of the prototype while incorporating improvements in maintainability, enhanceability, and portability.
75 FR 23824 - New Postal Products
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-04
... POSTAL REGULATORY COMMISSION [Docket No. MC2009-19; Order No. 449] New Postal Products AGENCY... Service request to add postal products to the Mail Classification Schedule. This notice addresses... postal services to the Mail Classification Schedule (MCS) product lists.\\1\\ In approving these additions...
Comparison of OPC job prioritization schemes to generate data for mask manufacturing
NASA Astrophysics Data System (ADS)
Lewis, Travis; Veeraraghavan, Vijay; Jantzen, Kenneth; Kim, Stephen; Park, Minyoung; Russell, Gordon; Simmons, Mark
2015-03-01
Delivering mask ready OPC corrected data to the mask shop on-time is critical for a foundry to meet the cycle time commitment for a new product. With current OPC compute resource sharing technology, different job scheduling algorithms are possible, such as, priority based resource allocation and fair share resource allocation. In order to maximize computer cluster efficiency, minimize the cost of the data processing and deliver data on schedule, the trade-offs of each scheduling algorithm need to be understood. Using actual production jobs, each of the scheduling algorithms will be tested in a production tape-out environment. Each scheduling algorithm will be judged on its ability to deliver data on schedule and the trade-offs associated with each method will be analyzed. It is now possible to introduce advance scheduling algorithms to the OPC data processing environment to meet the goals of on-time delivery of mask ready OPC data while maximizing efficiency and reducing cost.
2017-01-13
Quality Improvement, Inventory Management, Lead Time Reduction and Production Scheduling in High-mix Manufacturing Environments by Sean Daigle B.S...for the degree of Master of Engineering in Advanced Manufacturing and Design at the MASSACHUSETTS INSTITUTE OF TECHNOLOGY February 2017 c... Production Scheduling in High-mix Manufacturing Environments by Sean Daigle Submitted to the Department of Mechanical Engineering on January 13, 2017, in
Uncertainty management by relaxation of conflicting constraints in production process scheduling
NASA Technical Reports Server (NTRS)
Dorn, Juergen; Slany, Wolfgang; Stary, Christian
1992-01-01
Mathematical-analytical methods as used in Operations Research approaches are often insufficient for scheduling problems. This is due to three reasons: the combinatorial complexity of the search space, conflicting objectives for production optimization, and the uncertainty in the production process. Knowledge-based techniques, especially approximate reasoning and constraint relaxation, are promising ways to overcome these problems. A case study from an industrial CIM environment, namely high-grade steel production, is presented to demonstrate how knowledge-based scheduling with the desired capabilities could work. By using fuzzy set theory, the applied knowledge representation technique covers the uncertainty inherent in the problem domain. Based on this knowledge representation, a classification of jobs according to their importance is defined which is then used for the straightforward generation of a schedule. A control strategy which comprises organizational, spatial, temporal, and chemical constraints is introduced. The strategy supports the dynamic relaxation of conflicting constraints in order to improve tentative schedules.
Batch Scheduling for Hybrid Assembly Differentiation Flow Shop to Minimize Total Actual Flow Time
NASA Astrophysics Data System (ADS)
Maulidya, R.; Suprayogi; Wangsaputra, R.; Halim, A. H.
2018-03-01
A hybrid assembly differentiation flow shop is a three-stage flow shop consisting of Machining, Assembly and Differentiation Stages and producing different types of products. In the machining stage, parts are processed in batches on different (unrelated) machines. In the assembly stage, each part of the different parts is assembled into an assembly product. Finally, the assembled products will further be processed into different types of final products in the differentiation stage. In this paper, we develop a batch scheduling model for a hybrid assembly differentiation flow shop to minimize the total actual flow time defined as the total times part spent in the shop floor from the arrival times until its due date. We also proposed a heuristic algorithm for solving the problems. The proposed algorithm is tested using a set of hypothetic data. The solution shows that the algorithm can solve the problems effectively.
NASA Astrophysics Data System (ADS)
Hsiao, Ming-Chih; Su, Ling-Huey
2018-02-01
This research addresses the problem of scheduling hybrid machine types, in which one type is a two-machine flowshop and another type is a single machine. A job is either processed on the two-machine flowshop or on the single machine. The objective is to determine a production schedule for all jobs so as to minimize the makespan. The problem is NP-hard since the two parallel machines problem was proved to be NP-hard. Simulated annealing algorithms are developed to solve the problem optimally. A mixed integer programming (MIP) is developed and used to evaluate the performance for two SAs. Computational experiments demonstrate the efficiency of the simulated annealing algorithms, the quality of the simulated annealing algorithms will also be reported.
Resource-Constrained Project Scheduling Under Uncertainty: Models, Algorithms and Applications
2014-11-10
Make-to-Order (MTO) Production Planning using Bayesian Updating, International Journal of Production Economics (04 2014) Norman Keith Womer, Haitao...2013) Made-to-Order Production Scheduling using Bayesian Updating, Working Paper, under second-round review in International Journal of Production Economics . VI
Joint Light Tactical Vehicle (JLTV)
2013-12-01
BY - Base Year DAMIR - Defense Acquisition Management Information Retrieval Dev Est - Development Estimate DoD - Department of Defense DSN - Defense...Production Estimate QR - Quantity Related Qty - Quantity RDT&E - Research, Development , Test, and Evaluation SAR - Selected Acquisition Report Sch - Schedule... Development Estimate) Defense Acquisition Executive (DAE) Approved Acquisition Program Baseline (APB) dated October 23, 2012 Approved APB Defense
The LSST Scheduler from design to construction
NASA Astrophysics Data System (ADS)
Delgado, Francisco; Reuter, Michael A.
2016-07-01
The Large Synoptic Survey Telescope (LSST) will be a highly robotic facility, demanding a very high efficiency during its operation. To achieve this, the LSST Scheduler has been envisioned as an autonomous software component of the Observatory Control System (OCS), that selects the sequence of targets in real time. The Scheduler will drive the survey using optimization of a dynamic cost function of more than 200 parameters. Multiple science programs produce thousands of candidate targets for each observation, and multiple telemetry measurements are received to evaluate the external and the internal conditions of the observatory. The design of the LSST Scheduler started early in the project supported by Model Based Systems Engineering, detailed prototyping and scientific validation of the survey capabilities required. In order to build such a critical component, an agile development path in incremental releases is presented, integrated to the development plan of the Operations Simulator (OpSim) to allow constant testing, integration and validation in a simulated OCS environment. The final product is a Scheduler that is also capable of running 2000 times faster than real time in simulation mode for survey studies and scientific validation during commissioning and operations.
Automated Estimation Of Software-Development Costs
NASA Technical Reports Server (NTRS)
Roush, George B.; Reini, William
1993-01-01
COSTMODL is automated software development-estimation tool. Yields significant reduction in risk of cost overruns and failed projects. Accepts description of software product developed and computes estimates of effort required to produce it, calendar schedule required, and distribution of effort and staffing as function of defined set of development life-cycle phases. Written for IBM PC(R)-compatible computers.
Definition study for variable cycle engine testbed engine and associated test program
NASA Technical Reports Server (NTRS)
Vdoviak, J. W.
1978-01-01
The product/study double bypass variable cycle engine (VCE) was updated to incorporate recent improvements. The effect of these improvements on mission range and noise levels was determined. This engine design was then compared with current existing high-technology core engines in order to define a subscale testbed configuration that simulated many of the critical technology features of the product/study VCE. Detailed preliminary program plans were then developed for the design, fabrication, and static test of the selected testbed engine configuration. These plans included estimated costs and schedules for the detail design, fabrication and test of the testbed engine and the definition of a test program, test plan, schedule, instrumentation, and test stand requirements.
NASA Astrophysics Data System (ADS)
Shah, Rahul H.
Production costs account for the largest share of the overall cost of manufacturing facilities. With the U.S. industrial sector becoming more and more competitive, manufacturers are looking for more cost and resource efficient working practices. Operations management and production planning have shown their capability to dramatically reduce manufacturing costs and increase system robustness. When implementing operations related decision making and planning, two fields that have shown to be most effective are maintenance and energy. Unfortunately, the current research that integrates both is limited. Additionally, these studies fail to consider parameter domains and optimization on joint energy and maintenance driven production planning. Accordingly, production planning methodology that considers maintenance and energy is investigated. Two models are presented to achieve well-rounded operating strategy. The first is a joint energy and maintenance production scheduling model. The second is a cost per part model considering maintenance, energy, and production. The proposed methodology will involve a Time-of-Use electricity demand response program, buffer and holding capacity, station reliability, production rate, station rated power, and more. In practice, the scheduling problem can be used to determine a joint energy, maintenance, and production schedule. Meanwhile, the cost per part model can be used to: (1) test the sensitivity of the obtained optimal production schedule and its corresponding savings by varying key production system parameters; and (2) to determine optimal system parameter combinations when using the joint energy, maintenance, and production planning model. Additionally, a factor analysis on the system parameters is conducted and the corresponding performance of the production schedule under variable parameter conditions, is evaluated. Also, parameter optimization guidelines that incorporate maintenance and energy parameter decision making in the production planning framework are discussed. A modified Particle Swarm Optimization solution technique is adopted to solve the proposed scheduling problem. The algorithm is described in detail and compared to Genetic Algorithm. Case studies are presented to illustrate the benefits of using the proposed model and the effectiveness of the Particle Swarm Optimization approach. Numerical Experiments are implemented and analyzed to test the effectiveness of the proposed model. The proposed scheduling strategy can achieve savings of around 19 to 27 % in cost per part when compared to the baseline scheduling scenarios. By optimizing key production system parameters from the cost per part model, the baseline scenarios can obtain around 20 to 35 % in savings for the cost per part. These savings further increase by 42 to 55 % when system parameter optimization is integrated with the proposed scheduling problem. Using this method, the most influential parameters on the cost per part are the rated power from production, the production rate, and the initial machine reliabilities. The modified Particle Swarm Optimization algorithm adopted allows greater diversity and exploration compared to Genetic Algorithm for the proposed joint model which results in it being more computationally efficient in determining the optimal scheduling. While Genetic Algorithm could achieve a solution quality of 2,279.63 at an expense of 2,300 seconds in computational effort. In comparison, the proposed Particle Swarm Optimization algorithm achieved a solution quality of 2,167.26 in less than half the computation effort which is required by Genetic Algorithm.
Demand Activated Manufacturing Architecture (DAMA) model for supply chain collaboration
DOE Office of Scientific and Technical Information (OSTI.GOV)
CHAPMAN,LEON D.; PETERSEN,MARJORIE B.
The Demand Activated Manufacturing Architecture (DAMA) project during the last five years of work with the U.S. Integrated Textile Complex (retail, apparel, textile, and fiber sectors) has developed an inter-enterprise architecture and collaborative model for supply chains. This model will enable improved collaborative business across any supply chain. The DAMA Model for Supply Chain Collaboration is a high-level model for collaboration to achieve Demand Activated Manufacturing. The five major elements of the architecture to support collaboration are (1) activity or process, (2) information, (3) application, (4) data, and (5) infrastructure. These five elements are tied to the application of themore » DAMA architecture to three phases of collaboration - prepare, pilot, and scale. There are six collaborative activities that may be employed in this model: (1) Develop Business Planning Agreements, (2) Define Products, (3) Forecast and Plan Capacity Commitments, (4) Schedule Product and Product Delivery, (5) Expedite Production and Delivery Exceptions, and (6) Populate Supply Chain Utility. The Supply Chain Utility is a set of applications implemented to support collaborative product definition, forecast visibility, planning, scheduling, and execution. The DAMA architecture and model will be presented along with the process for implementing this DAMA model.« less
27 CFR 41.174 - Disposition of tobacco products and cigarette papers and tubes, and schedule.
Code of Federal Regulations, 2012 CFR
2012-04-01
... products and cigarette papers and tubes, and schedule. 41.174 Section 41.174 Alcohol, Tobacco Products and... IMPORTATION OF TOBACCO PRODUCTS, CIGARETTE PAPERS AND TUBES, AND PROCESSED TOBACCO Claims Tobacco Products and Cigarette Papers and Tubes Withdrawn from the Market § 41.174 Disposition of tobacco products and cigarette...
27 CFR 41.174 - Disposition of tobacco products and cigarette papers and tubes, and schedule.
Code of Federal Regulations, 2011 CFR
2011-04-01
... products and cigarette papers and tubes, and schedule. 41.174 Section 41.174 Alcohol, Tobacco Products and... IMPORTATION OF TOBACCO PRODUCTS, CIGARETTE PAPERS AND TUBES, AND PROCESSED TOBACCO Claims Tobacco Products and Cigarette Papers and Tubes Withdrawn from the Market § 41.174 Disposition of tobacco products and cigarette...
27 CFR 41.174 - Disposition of tobacco products and cigarette papers and tubes, and schedule.
Code of Federal Regulations, 2014 CFR
2014-04-01
... products and cigarette papers and tubes, and schedule. 41.174 Section 41.174 Alcohol, Tobacco Products and... IMPORTATION OF TOBACCO PRODUCTS, CIGARETTE PAPERS AND TUBES, AND PROCESSED TOBACCO Claims Tobacco Products and Cigarette Papers and Tubes Withdrawn from the Market § 41.174 Disposition of tobacco products and cigarette...
27 CFR 41.174 - Disposition of tobacco products and cigarette papers and tubes, and schedule.
Code of Federal Regulations, 2010 CFR
2010-04-01
... products and cigarette papers and tubes, and schedule. 41.174 Section 41.174 Alcohol, Tobacco Products and... IMPORTATION OF TOBACCO PRODUCTS, CIGARETTE PAPERS AND TUBES, AND PROCESSED TOBACCO Claims Tobacco Products and Cigarette Papers and Tubes Withdrawn from the Market § 41.174 Disposition of tobacco products and cigarette...
27 CFR 41.174 - Disposition of tobacco products and cigarette papers and tubes, and schedule.
Code of Federal Regulations, 2013 CFR
2013-04-01
... products and cigarette papers and tubes, and schedule. 41.174 Section 41.174 Alcohol, Tobacco Products and... IMPORTATION OF TOBACCO PRODUCTS, CIGARETTE PAPERS AND TUBES, AND PROCESSED TOBACCO Claims Tobacco Products and Cigarette Papers and Tubes Withdrawn from the Market § 41.174 Disposition of tobacco products and cigarette...
Integrating Growth Stage Deficit Irrigation into a Process Based Crop Model
NASA Technical Reports Server (NTRS)
Lopez, Jose R.; Winter, Jonathan M.; Elliott, Joshua; Ruane, Alex C.; Porter, Cheryl; Hoogenboom, Gerrit
2017-01-01
Current rates of agricultural water use are unsustainable in many regions, creating an urgent need to identify improved irrigation strategies for water limited areas. Crop models can be used to quantify plant water requirements, predict the impact of water shortages on yield, and calculate water productivity (WP) to link water availability and crop yields for economic analyses. Many simulations of crop growth and development, especially in regional and global assessments, rely on automatic irrigation algorithms to estimate irrigation dates and amounts. However, these algorithms are not well suited for water limited regions because they have simplistic irrigation rules, such as a single soil-moisture based threshold, and assume unlimited water. To address this constraint, a new modeling framework to simulate agricultural production in water limited areas was developed. The framework consists of a new automatic irrigation algorithm for the simulation of growth stage based deficit irrigation under limited seasonal water availability; and optimization of growth stage specific parameters. The new automatic irrigation algorithm was used to simulate maize and soybean in Gainesville, Florida, and first used to evaluate the sensitivity of maize and soybean simulations to irrigation at different growth stages and then to test the hypothesis that water productivity calculated using simplistic irrigation rules underestimates WP. In the first experiment, the effect of irrigating at specific growth stages on yield and irrigation water use efficiency (IWUE) in maize and soybean was evaluated. In the reproductive stages, IWUE tended to be higher than in the vegetative stages (e.g. IWUE was 18% higher than the well watered treatment when irrigating only during R3 in soybean), and when rainfall events were less frequent. In the second experiment, water productivity (WP) was significantly greater with optimized irrigation schedules compared to non-optimized irrigation schedules in water restricted scenarios. For example, the mean WP across 38 years of maize production was 1.1 kg/cu m for non-optimized irrigation schedules with 50 mm of seasonal available water and 2.1 kg/cu m optimized ion schedules, a 91% improvement in WP with optimized irrigation schedules. The framework described in this work could be used to estimate WP for regional to global assessments, as well as derive location specific irrigation guidance.
Second-Order Schedules of Token Reinforcement with Pigeons: Implications for Unit Price
ERIC Educational Resources Information Center
Bullock, Christopher E.; Hackenberg, Timothy D.
2006-01-01
Four pigeons were exposed to second-order schedules of token reinforcement, with stimulus lights serving as token reinforcers. Tokens were earned according to a fixed-ratio (token-production) schedule, with the opportunity to exchange tokens for food (exchange period) occurring after a fixed number had been produced (exchange-production ratio).…
Code of Federal Regulations, 2010 CFR
2010-01-01
... additionally planned production of Schedule 3 chemicals. 714.3 Section 714.3 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS § 714.3 Advance...
Code of Federal Regulations, 2010 CFR
2010-01-01
...) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.5 Annual declaration requirements for facilities engaged in... facilities engaged in the production of Schedule 1 chemicals for purposes not prohibited by the CWC. 712.5...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Fee schedule. 390.6 Section 390.6 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOOD SAFETY AND INSPECTION SERVICE ADMINISTRATIVE PROVISIONS FREEDOM OF INFORMATION AND PUBLIC INFORMATION § 390.6 Fee schedule. Department regulations provide for...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Fee schedule. 390.6 Section 390.6 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOOD SAFETY AND INSPECTION SERVICE ADMINISTRATIVE PROVISIONS FREEDOM OF INFORMATION AND PUBLIC INFORMATION § 390.6 Fee schedule. Department regulations provide for...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Fee schedule. 390.6 Section 390.6 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOOD SAFETY AND INSPECTION SERVICE ADMINISTRATIVE PROVISIONS FREEDOM OF INFORMATION AND PUBLIC INFORMATION § 390.6 Fee schedule. Department regulations provide for...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Fee schedule. 390.6 Section 390.6 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOOD SAFETY AND INSPECTION SERVICE ADMINISTRATIVE PROVISIONS FREEDOM OF INFORMATION AND PUBLIC INFORMATION § 390.6 Fee schedule. Department regulations provide for...
Alphabetical List of NCP Product Schedule (Products Available for Use During an Oil Spill)
The listing of a product on the Product Schedule does NOT mean that EPA approves, recommends, licenses, certifies, or authorizes its use; only that data have been submitted to EPA as required by Subpart J of the National Contingency Plan.
39 CFR 3020.11 - Initial Mail Classification Schedule.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 39 Postal Service 1 2014-07-01 2014-07-01 false Initial Mail Classification Schedule. 3020.11 Section 3020.11 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL PRODUCT LISTS Mail Classification Schedule § 3020.11 Initial Mail Classification Schedule. The initial Mail Classification Schedule shall...
NASA Technical Reports Server (NTRS)
Wilkinson, John; Johnson, Earl
1991-01-01
The work flow assistant (WFA) is an advanced technology project under the shuttle processing data management system (SPDMS) at Kennedy Space Center (KSC). It will be utilized for short range scheduling, controlling work flow on the floor, and providing near real-time status for all major space transportation systems (STS) work centers at KSC. It will increase personnel and STS safety and improve productivity through deeper active scheduling that includes tracking and correlation of STS and ground support equipment (GSE) configuration and work. It will also provide greater accessibility to this data. WFA defines a standards concept for scheduling data which permits both commercial off-the-shelf (COTS) scheduling tools and WFA developed applications to be reused. WFA will utilize industry standard languages and workstations to achieve a scalable, adaptable, and portable architecture which may be used at other sites.
Exploiting multicore compute resources in the CMS experiment
NASA Astrophysics Data System (ADS)
Ramírez, J. E.; Pérez-Calero Yzquierdo, A.; Hernández, J. M.; CMS Collaboration
2016-10-01
CMS has developed a strategy to efficiently exploit the multicore architecture of the compute resources accessible to the experiment. A coherent use of the multiple cores available in a compute node yields substantial gains in terms of resource utilization. The implemented approach makes use of the multithreading support of the event processing framework and the multicore scheduling capabilities of the resource provisioning system. Multicore slots are acquired and provisioned by means of multicore pilot agents which internally schedule and execute single and multicore payloads. Multicore scheduling and multithreaded processing are currently used in production for online event selection and prompt data reconstruction. More workflows are being adapted to run in multicore mode. This paper presents a review of the experience gained in the deployment and operation of the multicore scheduling and processing system, the current status and future plans.
Job Shop Scheduling Focusing on Role of Buffer
NASA Astrophysics Data System (ADS)
Hino, Rei; Kusumi, Tetsuya; Yoo, Jae-Kyu; Shimizu, Yoshiaki
A scheduling problem is formulated in order to consistently manage each manufacturing resource, including machine tools, assembly robots, AGV, storehouses, material shelves, and so on. The manufacturing resources are classified into three types: producer, location, and mover. This paper focuses especially on the role of the buffer, and the differences among these types are analyzed. A unified scheduling formulation is derived from the analytical results based on the resource’s roles. Scheduling procedures based on dispatching rules are also proposed in order to numerically evaluate job shop-type production having finite buffer capacity. The influences of the capacity of bottle-necked production devices and the buffer on productivity are discussed.
We recently conducted a laboratory study to measure the dispersion effectiveness of eight dispersants currently listed on the National Contingency Plan Product Schedule. Results are useful in determining how many commercial dispersant products would have been effective for use o...
9 CFR 381.303 - Critical factors and the application of the process schedule.
Code of Federal Regulations, 2010 CFR
2010-01-01
... PRODUCTS INSPECTION AND VOLUNTARY INSPECTION AND CERTIFICATION POULTRY PRODUCTS INSPECTION REGULATIONS... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Critical factors and the application of the process schedule. 381.303 Section 381.303 Animals and Animal Products FOOD SAFETY AND...
Using Open Space Technology for School Improvement.
ERIC Educational Resources Information Center
Cox, David
2002-01-01
Describes a theory referred to as Open Space Technology (OST), which holds that the most productive learning in conference settings takes place in the open space between formally scheduled conference sessions. Argues that OST can be applied to staff development days and other educational development programs. (Contains 10 references.) (NB)
NASA Technical Reports Server (NTRS)
Mizell, Carolyn Barrett; Malone, Linda
2007-01-01
The development process for a large software development project is very complex and dependent on many variables that are dynamic and interrelated. Factors such as size, productivity and defect injection rates will have substantial impact on the project in terms of cost and schedule. These factors can be affected by the intricacies of the process itself as well as human behavior because the process is very labor intensive. The complex nature of the development process can be investigated with software development process models that utilize discrete event simulation to analyze the effects of process changes. The organizational environment and its effects on the workforce can be analyzed with system dynamics that utilizes continuous simulation. Each has unique strengths and the benefits of both types can be exploited by combining a system dynamics model and a discrete event process model. This paper will demonstrate how the two types of models can be combined to investigate the impacts of human resource interactions on productivity and ultimately on cost and schedule.
30 CFR 560.110 - What bidding systems may BOEM use?
Code of Federal Regulations, 2014 CFR
2014-07-01
... bonus with royalty rate(s) based on formula(s) or schedule(s) during one or more periods of production...-scale formula, which relates the royalty rate to the adjusted value or volume of production, or (ii) A... include the sliding-scale formula or schedule and will specify the lowest and highest royalty rates that...
30 CFR 560.110 - What bidding systems may BOEM use?
Code of Federal Regulations, 2012 CFR
2012-07-01
... bonus with royalty rate(s) based on formula(s) or schedule(s) during one or more periods of production...-scale formula, which relates the royalty rate to the adjusted value or volume of production, or (ii) A... include the sliding-scale formula or schedule and will specify the lowest and highest royalty rates that...
30 CFR 560.110 - What bidding systems may BOEM use?
Code of Federal Regulations, 2013 CFR
2013-07-01
... bonus with royalty rate(s) based on formula(s) or schedule(s) during one or more periods of production...-scale formula, which relates the royalty rate to the adjusted value or volume of production, or (ii) A... include the sliding-scale formula or schedule and will specify the lowest and highest royalty rates that...
NASA Astrophysics Data System (ADS)
Kumar, Ashish; Chatterjee, Snehamoy
2017-05-01
Production scheduling is a crucial aspect of the mining industry. An optimal and efficient production schedule can increase the profits manifold and reduce the amount of waste to be handled. Production scheduling for coal mines is necessary to maintain consistency in the quality and quantity parameters of coal supplied to power plants. Irregularity in the quality parameters of the coal can lead to heavy losses in coal-fired power plants. Moreover, the stockpiling of coal poses environmental and fire problems owing to low incubation periods. This article proposes a production scheduling formulation for open-pit coal mines including stockpiling and blending opportunities, which play a major role in maintaining the quality and quantity of supplied coal. The proposed formulation was applied to a large open-pit coal mine in India. This contribution provides an efficient production scheduling formulation for coal mines after utilizing the stockpile coal within the incubation periods with the maximization of discounted cash flows. At the same time, consistency is maintained in the quality and quantity of coal to power plants through blending and stockpiling options to ensure smooth functioning.
Integration of scheduling and discrete event simulation systems to improve production flow planning
NASA Astrophysics Data System (ADS)
Krenczyk, D.; Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.
2016-08-01
The increased availability of data and computer-aided technologies such as MRPI/II, ERP and MES system, allowing producers to be more adaptive to market dynamics and to improve production scheduling. Integration of production scheduling and computer modelling, simulation and visualization systems can be useful in the analysis of production system constraints related to the efficiency of manufacturing systems. A integration methodology based on semi-automatic model generation method for eliminating problems associated with complexity of the model and labour-intensive and time-consuming process of simulation model creation is proposed. Data mapping and data transformation techniques for the proposed method have been applied. This approach has been illustrated through examples of practical implementation of the proposed method using KbRS scheduling system and Enterprise Dynamics simulation system.
Multiagent scheduling method with earliness and tardiness objectives in flexible job shops.
Wu, Zuobao; Weng, Michael X
2005-04-01
Flexible job-shop scheduling problems are an important extension of the classical job-shop scheduling problems and present additional complexity. Such problems are mainly due to the existence of a considerable amount of overlapping capacities with modern machines. Classical scheduling methods are generally incapable of addressing such capacity overlapping. We propose a multiagent scheduling method with job earliness and tardiness objectives in a flexible job-shop environment. The earliness and tardiness objectives are consistent with the just-in-time production philosophy which has attracted significant attention in both industry and academic community. A new job-routing and sequencing mechanism is proposed. In this mechanism, two kinds of jobs are defined to distinguish jobs with one operation left from jobs with more than one operation left. Different criteria are proposed to route these two kinds of jobs. Job sequencing enables to hold a job that may be completed too early. Two heuristic algorithms for job sequencing are developed to deal with these two kinds of jobs. The computational experiments show that the proposed multiagent scheduling method significantly outperforms the existing scheduling methods in the literature. In addition, the proposed method is quite fast. In fact, the simulation time to find a complete schedule with over 2000 jobs on ten machines is less than 1.5 min.
Self-balancing dynamic scheduling of electrical energy for energy-intensive enterprises
NASA Astrophysics Data System (ADS)
Gao, Yunlong; Gao, Feng; Zhai, Qiaozhu; Guan, Xiaohong
2013-06-01
Balancing production and consumption with self-generation capacity in energy-intensive enterprises has huge economic and environmental benefits. However, balancing production and consumption with self-generation capacity is a challenging task since the energy production and consumption must be balanced in real time with the criteria specified by power grid. In this article, a mathematical model for minimising the production cost with exactly realisable energy delivery schedule is formulated. And a dynamic programming (DP)-based self-balancing dynamic scheduling algorithm is developed to obtain the complete solution set for such a multiple optimal solutions problem. For each stage, a set of conditions are established to determine whether a feasible control trajectory exists. The state space under these conditions is partitioned into subsets and each subset is viewed as an aggregate state, the cost-to-go function is then expressed as a function of initial and terminal generation levels of each stage and is proved to be a staircase function with finite steps. This avoids the calculation of the cost-to-go of every state to resolve the issue of dimensionality in DP algorithm. In the backward sweep process of the algorithm, an optimal policy is determined to maximise the realisability of energy delivery schedule across the entire time horizon. And then in the forward sweep process, the feasible region of the optimal policy with the initial and terminal state at each stage is identified. Different feasible control trajectories can be identified based on the region; therefore, optimising for the feasible control trajectory is performed based on the region with economic and reliability objectives taken into account.
Production scheduling with discrete and renewable additional resources
NASA Astrophysics Data System (ADS)
Kalinowski, K.; Grabowik, C.; Paprocka, I.; Kempa, W.
2015-11-01
In this paper an approach to planning of additional resources when scheduling operations are discussed. The considered resources are assumed to be discrete and renewable. In most research in scheduling domain, the basic and often the only type of regarded resources is a workstation. It can be understood as a machine, a device or even as a separated space on the shop floor. In many cases, during the detailed scheduling of operations the need of using more than one resource, required for its implementation, can be indicated. Resource requirements for an operation may relate to different resources or resources of the same type. Additional resources are most often referred to these human resources, tools or equipment, for which the limited availability in the manufacturing system may have an influence on the execution dates of some operations. In the paper the concept of the division into basic and additional resources and their planning method was shown. A situation in which sets of basic and additional resources are not separable - the same additional resource may be a basic resource for another operation is also considered. Scheduling of operations, including greater amount of resources can cause many difficulties, depending on whether the resource is involved in the entire time of operation, only in the selected part(s) of operation (e.g. as auxiliary staff at setup time) or cyclic - e.g. when an operator supports more than one machine, or supervises the execution of several operations. For this reason the dates and work times of resources participation in the operation can be different. Presented issues are crucial when modelling of production scheduling environment and designing of structures for the purpose of scheduling software development.
2017-03-23
On July 1, 2016, the U.S. Food and Drug Administration (FDA) approved a new drug application for Syndros, a drug product consisting of dronabinol [(-)-delta-9-trans-tetrahydrocannabinol (delta-9-THC)] oral solution. Thereafter, the Department of Health and Human Services (HHS) provided the Drug Enforcement Administration (DEA) with a scheduling recommendation that would result in Syndros (and other oral solutions containing dronabinol) being placed in schedule II of the Controlled Substances Act (CSA). In accordance with the CSA, as revised by the Improving Regulatory Transparency for New Medical Therapies Act, DEA is hereby issuing an interim final rule placing FDA-approved products of oral solutions containing dronabinol in schedule II of the CSA.
Information logistics: A production-line approach to information services
NASA Technical Reports Server (NTRS)
Adams, Dennis; Lee, Chee-Seng
1991-01-01
Logistics can be defined as the process of strategically managing the acquisition, movement, and storage of materials, parts, and finished inventory (and the related information flow) through the organization and its marketing channels in a cost effective manner. It is concerned with delivering the right product to the right customer in the right place at the right time. The logistics function is composed of inventory management, facilities management, communications unitization, transportation, materials management, and production scheduling. The relationship between logistics and information systems is clear. Systems such as Electronic Data Interchange (EDI), Point of Sale (POS) systems, and Just in Time (JIT) inventory management systems are important elements in the management of product development and delivery. With improved access to market demand figures, logisticians can decrease inventory sizes and better service customer demand. However, without accurate, timely information, little, if any, of this would be feasible in today's global markets. Information systems specialists can learn from logisticians. In a manner similar to logistics management, information logistics is concerned with the delivery of the right data, to the ring customer, at the right time. As such, information systems are integral components of the information logistics system charged with providing customers with accurate, timely, cost-effective, and useful information. Information logistics is a management style and is composed of elements similar to those associated with the traditional logistics activity: inventory management (data resource management), facilities management (distributed, centralized and decentralized information systems), communications (participative design and joint application development methodologies), unitization (input/output system design, i.e., packaging or formatting of the information), transportations (voice, data, image, and video communication systems), materials management (data acquisition, e.g., EDI, POS, external data bases, data entry) and production scheduling (job, staff, and project scheduling).
77 FR 39737 - Controlled Substances: Proposed Adjustment to the Aggregate Production Quotas for 2012
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-05
... aggregate production quotas for some schedule I and II controlled substances, expressed in grams of.... [750,000 grams of levo-desoxyephedrine for use in a non-controlled, non-prescription product; 2,331,000 grams for methamphetamine mostly for conversion to a schedule III product; and 49,000 grams for...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-11
...-Plated Flat-Rolled Steel Products From Japan; Scheduling of the Final Phase of an Antidumping... imports from Japan of diffusion-annealed, nickel- plated flat-rolled steel products, provided for... diffusion-annealed, nickel- plated flat-rolled steel products from Japan are being sold in the United States...
Marching to the beat of Moore's Law
NASA Astrophysics Data System (ADS)
Borodovsky, Yan
2006-03-01
Area density scaling in integrated circuits, defined as transistor count per unit area, has followed the famous observation-cum-prediction by Gordon Moore for many generations. Known as "Moore's Law" which predicts density doubling every 18-24 month, it has provided all important synchronizing guidance and reference for tools and materials suppliers, IC manufacturers and their customers as to what minimal requirements their products and services need to meet to satisfy technical and financial expectations in support of the infrastructure required for the development and manufacturing of corresponding technology generation nodes. Multiple lithography solutions are usually under considerations for any given node. In general, three broad classes of solutions are considered: evolutionary - technology that is extension of existing technology infrastructure at similar or slightly higher cost and risk to schedule; revolutionary - technology that discards significant parts of the existing infrastructure at similar cost, higher risk to schedule but promises higher capability as compared to the evolutionary approach; and last but not least, disruptive - approach that as a rule promises similar or better capabilities, much lower cost and wholly unpredictable risk to schedule and products yields. This paper examines various lithography approaches, their respective merits against criteria of respective infrastructure availability, affordability and risk to IC manufacturer's schedules and strategy involved in developing and selecting best solution in an attempt to sort out key factors that will impact the decision on the lithography choice for large-scale manufacturing for the future technology nodes.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Standard Form 1427, Inventory Schedule A-Construction Sheet (Metals in Mill Product Form). 53.301-1427 Section 53.301-1427... Illustrations of Forms 53.301-1427 Standard Form 1427, Inventory Schedule A—Construction Sheet (Metals in Mill...
Advanced membrane devices. Interim report for October 1996--September 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laciak, D.V.; Langsam, M.; Lewnard, J.J.
1997-12-31
Under this Cooperative Agreement, Air Products and Chemicals, Inc. has continued to investigate and develop improved membrane technology for removal of carbon dioxide from natural gas. The task schedule for this reporting period included a detailed assessment of the market opportunity (Chapter 2), continued development and evaluation of membranes and membrane polymers (Chapter 3) and a detailed economic analysis comparing the potential of Air Products membranes to that of established acid gas removal processes (Chapter 4).
Design requirements for SRB production control system. Volume 4: Implementation
NASA Technical Reports Server (NTRS)
1981-01-01
The implementation plan which is presented was developed to provide the means for the successful implementation of the automated production control system. There are three factors which the implementation plan encompasses: detailed planning; phased implementation; and user involvement. The plan is detailed to the task level in terms of necessary activities as the system is developed, refined, installed, and tested. These tasks are scheduled, on a preliminary basis, over a two-and-one-half-year time frame.
ERIC Educational Resources Information Center
Seligman, Linda
1984-01-01
Presents a method for helping clients deal productively with temporary intervals in counseling relationships that may be caused by either counselor or client vacations or trips. Advocates developing goals, providing an opportunity for continued communication, referrals, processing of accomplishments, and scheduling the next session. (LLL)
Satellite-Based Videoconferencing.
ERIC Educational Resources Information Center
Distance Education Report, 1997
1997-01-01
Educators can broadcast videoconferences to students in different parts of the world at an affordable cost using geostationary satellites. Describes the design and presentation of videoconferences and outlines steps in their development: budgeting, scheduling, selecting presenters and moderators, choosing production and telecast facilities,…
Throughput Optimization of Continuous Biopharmaceutical Manufacturing Facilities.
Garcia, Fernando A; Vandiver, Michael W
2017-01-01
In order to operate profitably under different product demand scenarios, biopharmaceutical companies must design their facilities with mass output flexibility in mind. Traditional biologics manufacturing technologies pose operational challenges in this regard due to their high costs and slow equipment turnaround times, restricting the types of products and mass quantities that can be processed. Modern plant design, however, has facilitated the development of lean and efficient bioprocessing facilities through footprint reduction and adoption of disposable and continuous manufacturing technologies. These development efforts have proven to be crucial in seeking to drastically reduce the high costs typically associated with the manufacturing of recombinant proteins. In this work, mathematical modeling is used to optimize annual production schedules for a single-product commercial facility operating with a continuous upstream and discrete batch downstream platform. Utilizing cell culture duration and volumetric productivity as process variables in the model, and annual plant throughput as the optimization objective, 3-D surface plots are created to understand the effect of process and facility design on expected mass output. The model shows that once a plant has been fully debottlenecked it is capable of processing well over a metric ton of product per year. Moreover, the analysis helped to uncover a major limiting constraint on plant performance, the stability of the neutralized viral inactivated pool, which may indicate that this should be a focus of attention during future process development efforts. LAY ABSTRACT: Biopharmaceutical process modeling can be used to design and optimize manufacturing facilities and help companies achieve a predetermined set of goals. One way to perform optimization is by making the most efficient use of process equipment in order to minimize the expenditure of capital, labor and plant resources. To that end, this paper introduces a novel mathematical algorithm used to determine the most optimal equipment scheduling configuration that maximizes the mass output for a facility producing a single product. The paper also illustrates how different scheduling arrangements can have a profound impact on the availability of plant resources, and identifies limiting constraints on the plant design. In addition, simulation data is presented using visualization techniques that aid in the interpretation of the scientific concepts discussed. © PDA, Inc. 2017.
Code of Federal Regulations, 2010 CFR
2010-01-01
... INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS § 713.4 Advance declaration requirements for additionally planned production... additionally planned production, processing, or consumption of Schedule 2 chemicals. 713.4 Section 713.4...
39 CFR 3020.91 - Modification.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Change the Mail Classification Schedule § 3020.91 Modification. The Postal Service shall submit corrections to product descriptions in the Mail Classification Schedule that do not constitute a proposal to modify the market dominant product list or the competitive product list as defined in § 3020.30 by filing...
39 CFR 3020.91 - Modification.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Change the Mail Classification Schedule § 3020.91 Modification. The Postal Service shall submit corrections to product descriptions in the Mail Classification Schedule that do not constitute a proposal to modify the market dominant product list or the competitive product list as defined in § 3020.30 by filing...
Code of Federal Regulations, 2011 CFR
2011-01-01
... INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS § 713.4 Advance declaration requirements for additionally planned production... additionally planned production, processing, or consumption of Schedule 2 chemicals. 713.4 Section 713.4...
Guide for Transitioning Army Missile Systems From Development to Production.
1981-07-01
cost reduction ideas. 3 e! M. atumtion0 !eM . One missile system currently In fall *"I* develoluft, MM9 bee foregone the traditional engineering... costs , delivery schedules and deployment dates. Because of these difficulties and a desire to improve the weapon systems acquisition process, the...tered during the transition of new missile systems into production include: 1. High production unit costs - Occasionally the number of systems to be
European Scientific Notes. Volume 36, Number 8,
1982-08-31
forward) bias applied to the control products on schedule. In April 1981 the firm gate causes the control transistor to become completed its most recent...research and development activities sup- said to take but a microsecond! As energy is porting the production of devices and compo- dissipated only during...the switching period and nents not only for its own end-use- product as this time is about 100%times shorter than subassemblies and subsystems but also
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-27
... Related Products and Services AGENCY: National Environmental Satellite, Data and Information Service..., information, and related products and services to users. NESDIS is revising the fee schedule to ensure that... related products and services. NESDIS is authorized under 15 U.S.C. 1534 to assess fees, up to fair market...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-19
... Related Products and Services AGENCY: National Environmental Satellite, Data and Information Service..., information, and related products and services to users. NESDIS is revising the fee schedule that has been in... environmental data, information, and related products and services. NESDIS is authorized under 15 U.S.C. 1534 to...
The key to successful management of STS operations: An integrated production planning system
NASA Technical Reports Server (NTRS)
Johnson, W. A.; Thomasen, C. T.
1985-01-01
Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.
NASA Astrophysics Data System (ADS)
Ladaniuk, Anatolii; Ivashchuk, Viacheslav; Kisała, Piotr; Askarova, Nursanat; Sagymbekova, Azhar
2015-12-01
Conditions of diversification of enterprise products are involving for changes of higher levels of management hierarchy, so it's leading by tasks correcting and changing schedule for operating of production plans. Ordinary solve by combination of enterprise resource are planning and management execution system often has exclusively statistical content. So, the development of decision support system, that helps to use knowledge about subject for capabilities estimating and order of operation of production object is relevant in this time.
Decision Model for Planning and Scheduling of Seafood Product Considering Traceability
NASA Astrophysics Data System (ADS)
Agustin; Mawengkang, Herman; Mathelinea, Devy
2018-01-01
Due to the global challenges, it is necessary for an industrial company to integrate production scheduling and distribution planning, in order to be more efficient and to get more economics advantages. This paper presents seafood production planning and scheduling of a seafood manufacture company which produces simultaneously multi kind of seafood products, located at Aceh Province, Indonesia. The perishability nature of fish highly restricts its storage duration and delivery conditions. Traceability is a tracking requirement to check whether the quality of the product is satisfied. The production and distribution planning problem aims to meet customer demand subject to traceability of the seafood product and other restrictions. The problem is modeled as a mixed integer linear program, and then it is solved using neighborhood search approach.
Planning Risk-Based SQC Schedules for Bracketed Operation of Continuous Production Analyzers.
Westgard, James O; Bayat, Hassan; Westgard, Sten A
2018-02-01
To minimize patient risk, "bracketed" statistical quality control (SQC) is recommended in the new CLSI guidelines for SQC (C24-Ed4). Bracketed SQC requires that a QC event both precedes and follows (brackets) a group of patient samples. In optimizing a QC schedule, the frequency of QC or run size becomes an important planning consideration to maintain quality and also facilitate responsive reporting of results from continuous operation of high production analytic systems. Different plans for optimizing a bracketed SQC schedule were investigated on the basis of Parvin's model for patient risk and CLSI C24-Ed4's recommendations for establishing QC schedules. A Sigma-metric run size nomogram was used to evaluate different QC schedules for processes of different sigma performance. For high Sigma performance, an effective SQC approach is to employ a multistage QC procedure utilizing a "startup" design at the beginning of production and a "monitor" design periodically throughout production. Example QC schedules are illustrated for applications with measurement procedures having 6-σ, 5-σ, and 4-σ performance. Continuous production analyzers that demonstrate high σ performance can be effectively controlled with multistage SQC designs that employ a startup QC event followed by periodic monitoring or bracketing QC events. Such designs can be optimized to minimize the risk of harm to patients. © 2017 American Association for Clinical Chemistry.
NASA Technical Reports Server (NTRS)
1993-01-01
C Language Integrated Production System (CLIPS), a NASA-developed expert systems program, is used by American Airlines for three purposes: as a rapid prototyping tool; to develop production prototypes; and to develop production application. An example of the latter is CLIPS' use in "Hub S1AAshing," a knowledge based system that recommends contingency plans when severe schedule reductions must be made. Hub S1AAshing has replaced a manual, labor intensive process. It saves time and allows Operations Control Coordinators to handle more difficult situations. Because the system assimilates much of the information necessary to facilitate educated decision making, it minimizes negative impact in situations where it is impossible to operate all flights.
Dry kiln schedules for commercial woods : temperate and tropical
R. Sidney Boone; Charles J. Kozlik; Paul J. Bois; Eugene M. Wengert
1988-01-01
This report contains suggested dry kiln schedules for over 500 commercial woods, both temperate and tropical. Kiln schedules are completely assembled and written out for easy use. Schedules for several thicknesses and specialty products (e.g. squares, handle stock, gunstock blanks) are given for many species. The majority of the schedules are from the world literature...
PanDA Pilot Submission using Condor-G: Experience and Improvements
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhao X.; Hover John; Wlodek Tomasz
2011-01-01
PanDA (Production and Distributed Analysis) is the workload management system of the ATLAS experiment, used to run managed production and user analysis jobs on the grid. As a late-binding, pilot-based system, the maintenance of a smooth and steady stream of pilot jobs to all grid sites is critical for PanDA operation. The ATLAS Computing Facility (ACF) at BNL, as the ATLAS Tier1 center in the US, operates the pilot submission systems for the US. This is done using the PanDA 'AutoPilot' scheduler component which submits pilot jobs via Condor-G, a grid job scheduling system developed at the University of Wisconsin-Madison.more » In this paper, we discuss the operation and performance of the Condor-G pilot submission at BNL, with emphasis on the challenges and issues encountered in the real grid production environment. With the close collaboration of Condor and PanDA teams, the scalability and stability of the overall system has been greatly improved over the last year. We review improvements made to Condor-G resulting from this collaboration, including isolation of site-based issues by running a separate Gridmanager for each remote site, introduction of the 'Nonessential' job attribute to allow Condor to optimize its behavior for the specific character of pilot jobs, better understanding and handling of the Gridmonitor process, as well as better scheduling in the PanDA pilot scheduler component. We will also cover the monitoring of the health of the system.« less
9 CFR 307.4 - Schedule of operations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Schedule of operations. 307.4 Section 307.4 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY INSPECTION AND CERTIFICATION FACILITIES FOR INSPECTION ...
9 CFR 307.4 - Schedule of operations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Schedule of operations. 307.4 Section 307.4 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY INSPECTION AND CERTIFICATION FACILITIES FOR INSPECTION ...
9 CFR 307.4 - Schedule of operations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Schedule of operations. 307.4 Section 307.4 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY INSPECTION AND CERTIFICATION FACILITIES FOR INSPECTION ...
21 CFR 1314.155 - Suspension pending final order.
Code of Federal Regulations, 2012 CFR
2012-04-01
... LISTED CHEMICAL PRODUCTS Order to Show Cause § 1314.155 Suspension pending final order. (a) The Administrator may suspend the right to sell scheduled listed chemical products simultaneously with, or at any... prohibited from selling scheduled listed chemical products, in any case where he finds that there is an...
21 CFR 1314.155 - Suspension pending final order.
Code of Federal Regulations, 2014 CFR
2014-04-01
... LISTED CHEMICAL PRODUCTS Order to Show Cause § 1314.155 Suspension pending final order. (a) The Administrator may suspend the right to sell scheduled listed chemical products simultaneously with, or at any... prohibited from selling scheduled listed chemical products, in any case where he finds that there is an...
21 CFR 1314.155 - Suspension pending final order.
Code of Federal Regulations, 2013 CFR
2013-04-01
... LISTED CHEMICAL PRODUCTS Order to Show Cause § 1314.155 Suspension pending final order. (a) The Administrator may suspend the right to sell scheduled listed chemical products simultaneously with, or at any... prohibited from selling scheduled listed chemical products, in any case where he finds that there is an...
21 CFR 1314.155 - Suspension pending final order.
Code of Federal Regulations, 2011 CFR
2011-04-01
... LISTED CHEMICAL PRODUCTS Order to Show Cause § 1314.155 Suspension pending final order. (a) The Administrator may suspend the right to sell scheduled listed chemical products simultaneously with, or at any... prohibited from selling scheduled listed chemical products, in any case where he finds that there is an...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-23
... 1117-AB23 Schedules of Controlled Substances; Table of Excluded Nonnarcotic Products: Nasal Decongestant Inhalers Manufactured by Classic Pharmaceuticals, LLC AGENCY: Drug Enforcement Administration (DEA... Administration (DEA) is updating the Table of Excluded Nonnarcotic Products found in 21 CFR 1308.22 to include...
Scheduling System Assessment, and Development and Enhancement of Re-engineered Version of GPSS
NASA Technical Reports Server (NTRS)
Loganantharaj, Rasiah; Thomas, Bushrod; Passonno, Nicole
1996-01-01
The objective of this project is two-fold. First to provide an evaluation of a commercially developed version of the ground processing scheduling system (GPSS) for its applicability to the Kennedy Space Center (KSC) ground processing problem. Second, to work with the KSC GPSS development team and provide enhancement to the existing software. Systems reengineering is required to provide a sustainable system for the users and the software maintenance group. Using the LISP profile prototype code developed by the GPSS reverse reengineering groups as a building block, we have implemented the resource deconfliction portion of GPSS in common LISP using its object oriented features. The prototype corrects and extends some of the deficiencies of the current production version, plus it uses and builds on the classes from the development team's profile prototype.
50 CFR 20.100 - General provisions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... General provisions. (a) The taking, possession, transportation, and other uses of migratory game birds by.... Migratory game bird population levels, including production and habitat conditions, vary annually. These... migratory game birds to permissible levels. (b) The development of these schedules involves annual data...
50 CFR 20.100 - General provisions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... General provisions. (a) The taking, possession, transportation, and other uses of migratory game birds by.... Migratory game bird population levels, including production and habitat conditions, vary annually. These... migratory game birds to permissible levels. (b) The development of these schedules involves annual data...
50 CFR 20.100 - General provisions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... General provisions. (a) The taking, possession, transportation, and other uses of migratory game birds by.... Migratory game bird population levels, including production and habitat conditions, vary annually. These... migratory game birds to permissible levels. (b) The development of these schedules involves annual data...
50 CFR 20.100 - General provisions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... General provisions. (a) The taking, possession, transportation, and other uses of migratory game birds by.... Migratory game bird population levels, including production and habitat conditions, vary annually. These... migratory game birds to permissible levels. (b) The development of these schedules involves annual data...
50 CFR 20.100 - General provisions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... General provisions. (a) The taking, possession, transportation, and other uses of migratory game birds by.... Migratory game bird population levels, including production and habitat conditions, vary annually. These... migratory game birds to permissible levels. (b) The development of these schedules involves annual data...
Automotive Manufacturing Assessment System : Volume 1. Master Product Schedules.
DOT National Transportation Integrated Search
1999-11-01
Volume I is part of a four volume set documenting areas of research resulting from the development of the Automotive Manufacturing Assessment System (AMAS) for the DOT/Transportation Systems Center. AMAS was designed to assist in the evaluation of in...
48 CFR 42.302 - Contract administration functions.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...
48 CFR 42.302 - Contract administration functions.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...
48 CFR 42.302 - Contract administration functions.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...
48 CFR 42.302 - Contract administration functions.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...
7 CFR 2.24 - Assistant Secretary for Administration.
Code of Federal Regulations, 2013 CFR
2013-01-01
... determining whether to continue, modify, or terminate an information technology program or project. (iii... technology to improve productivity in the Department. (P) Plan, develop, install, and operate computer-based systems for message exchange, scheduling, computer conferencing, televideo technologies, and other...
Resource Allocation in a Repetitive Project Scheduling Using Genetic Algorithm
NASA Astrophysics Data System (ADS)
Samuel, Biju; Mathew, Jeeno
2018-03-01
Resource Allocation is procedure of doling out or allocating the accessible assets in a monetary way and productive way. Resource allocation is the scheduling of the accessible assets and accessible exercises or activities required while thinking about both the asset accessibility and the total project completion time. Asset provisioning and allocation takes care of that issue by permitting the specialist co-ops to deal with the assets for every individual demand of asset. A probabilistic selection procedure has been developed in order to ensure various selections of chromosomes
2006-09-26
In March 2006, the President signed the Combat Methamphetamine Epidemic Act of 2005, which establishes new requirements for retail sales of over-the-counter (nonprescription) products containing the List I chemicals ephedrine, pseudoephedrine, and phenylpropanolamine. The three chemicals can be used to manufacture methamphetamine illegally. DEA is promulgating this rule to incorporate the statutory provisions and make its regulations consistent with the new requirements. This action establishes daily and 30-day limits on the sales of scheduled listed chemical products to individuals and requires recordkeeping on most sales.
Scribner, Elisabeth A.; Orlando, James L.; Battaglin, William A.; Sandstrom, Mark; Kuivila, Kathryn; Meyer, Michael T.
2006-01-01
In accordance with the mission of the U.S. Geological Survey (USGS) Toxic Substances Hydrology Program, a pesticide study was conducted during 2003-04 to determine the occurrence of the fungicide chlorothalonil and its degradation products at 22 surface-water sites in five Southern States. Water-quality samples were collected during the peanut-growing season (June-September) in 2003. During the peanut-growing season in 2004, samples were collected after large storms. An analytical method was developed at the USGS Organic Geochemistry Research Laboratory in Lawrence, Kansas, to measure chlorothalonil and its degradation products by liquid chromatography/mass spectrometry (LC/MS). Chlorothalonil was detected in 4 of the 113 surface-water samples. The primary degradation product of chlorothalonil, 4-hydroxy-chlorothalonil, was detected in 26 of the 113 samples with concentrations ranging from 0.002 to 0.930 microgram per liter. The chlorothalonil degradation products, 1-amide-4-hydroxy-chorothalonil and 1,3-diamide-chlorothalonil, were detected in one water sample each at 0.020 and 0.161 microgram per liter, respectively. The USGS Methods and Research Development Group, Lakewood, Colorado, developed a custom method for chlorothalonil using gas chromatography/mass spectrometry (GC/MS) in an effort to achieve a lower laboratory reporting level (LRL) than the USGS National Water-Quality Laboratory (NWQL) schedule 2060, which analyzes the compound chlorothalonil at a LRL of 0.035 ?g/L. The group succeeded in achieving a lower GC/MS reporting level of 0.01 ?g/L. Chlorothalonil was detected in 5 of 68 water samples analyzed using the custom GC/MS method, whereas chlorothalonil was detected in 2 of 21 water samples analyzed using NWQL schedule 2060. In addition to analysis of chlorothalonil and its degradation products, samples were analyzed using the USGS NWQL schedules 2001 and 2060 for about 114 pesticides and their degradation products. Samples also were analyzed for dissolved organic carbon, suspended sediment, and percentage of silt- and clay-sized particles. Overall, it was found that chlorothalonil was detected only infrequently and at relatively low concentrations. Chlorothalonil's major degradation product, 4-hydroxy-chlorothalonil, was detected most frequently, occurred generally at higher concentrations in water samples than did the parent fungicide, and the data from this study reaffirmed that it is the dominant degradation product of chlorothalonil in the peanut-growing environment.
NASA Astrophysics Data System (ADS)
Garcia-Santiago, C. A.; Del Ser, J.; Upton, C.; Quilligan, F.; Gil-Lopez, S.; Salcedo-Sanz, S.
2015-11-01
When seeking near-optimal solutions for complex scheduling problems, meta-heuristics demonstrate good performance with affordable computational effort. This has resulted in a gravitation towards these approaches when researching industrial use-cases such as energy-efficient production planning. However, much of the previous research makes assumptions about softer constraints that affect planning strategies and about how human planners interact with the algorithm in a live production environment. This article describes a job-shop problem that focuses on minimizing energy consumption across a production facility of shared resources. The application scenario is based on real facilities made available by the Irish Center for Manufacturing Research. The formulated problem is tackled via harmony search heuristics with random keys encoding. Simulation results are compared to a genetic algorithm, a simulated annealing approach and a first-come-first-served scheduling. The superior performance obtained by the proposed scheduler paves the way towards its practical implementation over industrial production chains.
Provenance-aware optimization of workload for distributed data production
NASA Astrophysics Data System (ADS)
Makatun, Dzmitry; Lauret, Jérôme; Rudová, Hana; Šumbera, Michal
2017-10-01
Distributed data processing in High Energy and Nuclear Physics (HENP) is a prominent example of big data analysis. Having petabytes of data being processed at tens of computational sites with thousands of CPUs, standard job scheduling approaches either do not address well the problem complexity or are dedicated to one specific aspect of the problem only (CPU, network or storage). Previously we have developed a new job scheduling approach dedicated to distributed data production - an essential part of data processing in HENP (preprocessing in big data terminology). In this contribution, we discuss the load balancing with multiple data sources and data replication, present recent improvements made to our planner and provide results of simulations which demonstrate the advantage against standard scheduling policies for the new use case. Multi-source or provenance is common in computing models of many applications whereas the data may be copied to several destinations. The initial input data set would hence be already partially replicated to multiple locations and the task of the scheduler is to maximize overall computational throughput considering possible data movements and CPU allocation. The studies have shown that our approach can provide a significant gain in overall computational performance in a wide scope of simulations considering realistic size of computational Grid and various input data distribution.
Defense Science Board Task Force Report: The Role of Autonomy in DoD Systems
2012-07-01
ASD(R&E) and the Military Services should schedule periodic, on-site collaborations that bring together academia, government and not-for-profit labs...expressing UxV activities, increased problem solving, planning and scheduling capabilities to enable dynamic tasking of distributed UxVs and tools for...industrial, governmental and military. Manufacturing has long exploited planning for logistics and matching product demand to production schedules
Evaluation of scheduling techniques for payload activity planning
NASA Technical Reports Server (NTRS)
Bullington, Stanley F.
1991-01-01
Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.
The role of the production scheduling system in rescheduling
NASA Astrophysics Data System (ADS)
Kalinowski, K.; Grabowik, C.; Kempa, W.; Paprocka, I.
2015-11-01
The paper presents the rescheduling problem in the context of cooperation between production scheduling system (PSS) and other units in an integrated manufacturing environment - decision makers and software systems. The main aim is to discuss the PSS functionality for maximizing automation of the rescheduling process, reducing the response time and improving the quality of generated solutions. PSSs operate in the meeting of tactical and operational level of planning and control, and play an important role in the production preparation and control. On the basis of information about orders, technology and production system state (e.g. resources availability) they prepare and/or update a detailed plan of production flow - a schedule. All necessary data for scheduling and rescheduling are usually collected in other systems both from organizational and technical production preparation, e.g. ERP, PLM, MES, CAPP or others, as well as they are entered directly by the decision- makers/operators. Data acquired in this way are often incomplete and inconsistent. Therefore the existing rescheduling software works according to interactive method - rather support but does not replace the human decision maker in tasks planning. When rescheduling, due to the limited amount of time to make a decision this interaction is particularly important. An additional problem arises in data acquisition, in the process of data exchanging between systems or in the identification of new data sources and their processing. Different approaches to rescheduling were characterized, including those solutions, where all these operations are carried out by an autonomous system and those in which scheduling is performed only upon request from the outside, for the newly created scheduling data representing the current state of the production system.
9 CFR 307.4 - Schedule of operations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... inspectors shall not, except as provided herein, occur prior to 4 hours after the beginning of scheduled... efficient and effective use of inspection personnel. The work schedule must specify daily clock hours of... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Schedule of operations. 307.4 Section...
Zhang, Rui
2017-01-01
The traditional way of scheduling production processes often focuses on profit-driven goals (such as cycle time or material cost) while tending to overlook the negative impacts of manufacturing activities on the environment in the form of carbon emissions and other undesirable by-products. To bridge the gap, this paper investigates an environment-aware production scheduling problem that arises from a typical paint shop in the automobile manufacturing industry. In the studied problem, an objective function is defined to minimize the emission of chemical pollutants caused by the cleaning of painting devices which must be performed each time before a color change occurs. Meanwhile, minimization of due date violations in the downstream assembly shop is also considered because the two shops are interrelated and connected by a limited-capacity buffer. First, we have developed a mixed-integer programming formulation to describe this bi-objective optimization problem. Then, to solve problems of practical size, we have proposed a novel multi-objective particle swarm optimization (MOPSO) algorithm characterized by problem-specific improvement strategies. A branch-and-bound algorithm is designed for accurately assessing the most promising solutions. Finally, extensive computational experiments have shown that the proposed MOPSO is able to match the solution quality of an exact solver on small instances and outperform two state-of-the-art multi-objective optimizers in literature on large instances with up to 200 cars. PMID:29295603
21 CFR 1310.16 - Exemptions for certain scheduled listed chemical products.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Exemptions for certain scheduled listed chemical products. 1310.16 Section 1310.16 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE... chapter if the Administrator determines that the product cannot be used in the illicit manufacture of a...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-13
... individual employees may sell scheduled listed chemical products. The law governing self-certification of... listed chemical products. This record must be kept in the employee's personnel file. Self-certification... listed chemical products at retail. The annual self-certification fee for regulated sellers who are not...
Analysis of oil-pipeline distribution of multiple products subject to delivery time-windows
NASA Astrophysics Data System (ADS)
Jittamai, Phongchai
This dissertation defines the operational problems of, and develops solution methodologies for, a distribution of multiple products into oil pipeline subject to delivery time-windows constraints. A multiple-product oil pipeline is a pipeline system composing of pipes, pumps, valves and storage facilities used to transport different types of liquids. Typically, products delivered by pipelines are petroleum of different grades moving either from production facilities to refineries or from refineries to distributors. Time-windows, which are generally used in logistics and scheduling areas, are incorporated in this study. The distribution of multiple products into oil pipeline subject to delivery time-windows is modeled as multicommodity network flow structure and mathematically formulated. The main focus of this dissertation is the investigation of operating issues and problem complexity of single-source pipeline problems and also providing solution methodology to compute input schedule that yields minimum total time violation from due delivery time-windows. The problem is proved to be NP-complete. The heuristic approach, a reversed-flow algorithm, is developed based on pipeline flow reversibility to compute input schedule for the pipeline problem. This algorithm is implemented in no longer than O(T·E) time. This dissertation also extends the study to examine some operating attributes and problem complexity of multiple-source pipelines. The multiple-source pipeline problem is also NP-complete. A heuristic algorithm modified from the one used in single-source pipeline problems is introduced. This algorithm can also be implemented in no longer than O(T·E) time. Computational results are presented for both methodologies on randomly generated problem sets. The computational experience indicates that reversed-flow algorithms provide good solutions in comparison with the optimal solutions. Only 25% of the problems tested were more than 30% greater than optimal values and approximately 40% of the tested problems were solved optimally by the algorithms.
ERIC Educational Resources Information Center
GLOVER, J.H.
THE CHIEF OBJECTIVE OF THIS STUDY OF SPEED-SKILL ACQUISITION WAS TO FIND A MATHEMATICAL MODEL CAPABLE OF SIMPLE GRAPHIC INTERPRETATION FOR INDUSTRIAL TRAINING AND PRODUCTION SCHEDULING AT THE SHOP FLOOR LEVEL. STUDIES OF MIDDLE SKILL DEVELOPMENT IN MACHINE AND VEHICLE ASSEMBLY, AIRCRAFT PRODUCTION, SPOOLMAKING AND THE MACHINING OF PARTS CONFIRMED…
Lumber drying and heat sterilization research at the U.S. Forest Products Laboratory
William T. Simpson
2002-01-01
The Forest Products Laboratory (FPL) has a long history of research and technology transfer in lumber drying. Many of the dry kiln schedules used in industry today were developed by the staff of the Laboratory, and for many years the Laboratory conducted a kiln drying short course for training dry kiln operators. The purpose of this report is to describe the Laboratory...
Distribution of a Generic Mission Planning and Scheduling Toolkit for Astronomical Spacecraft
NASA Technical Reports Server (NTRS)
Kleiner, Steven C.
1996-01-01
Work is progressing as outlined in the proposal for this contract. A working planning and scheduling system has been documented and packaged and made available to the WIRE Small Explorer group at JPL, the FUSE group at JHU, the NASA/GSFC Laboratory for Astronomy and Solar Physics and the Advanced Planning and Scheduling Branch at STScI. The package is running successfully on the WIRE computer system. It is expected that the WIRE will reuse significant portions of the SWAS code in its system. This scheduling system itself was tested successfully against the spacecraft hardware in December 1995. A fully automatic scheduling module has been developed and is being added to the toolkit. In order to maximize reuse, the code is being reorganized during the current build into object-oriented class libraries. A paper describing the toolkit has been written and is included in the software distribution. We have experienced interference between the export and production versions of the toolkit. We will be requesting permission to reprogram funds in order to purchase a standalone PC onto which to offload the export version.
Multinational Coproduction of Military Aerospace Systems.
1981-10-01
when the participating nations and industries have different and sometimes conflicting goals and practices, the en - deavor is usually even more...development programs and concurrency of development and production activities. In this schedule framework, en - gine development problems contributed at least...that Panavia inevitably had to go through are frequently cited as length- ening the program. Thus, it is possible that the MRCA acquisition program is
Managing distributed software development in the Virtual Astronomical Observatory
NASA Astrophysics Data System (ADS)
Evans, Janet D.; Plante, Raymond L.; Boneventura, Nina; Busko, Ivo; Cresitello-Dittmar, Mark; D'Abrusco, Raffaele; Doe, Stephen; Ebert, Rick; Laurino, Omar; Pevunova, Olga; Refsdal, Brian; Thomas, Brian
2012-09-01
The U.S. Virtual Astronomical Observatory (VAO) is a product-driven organization that provides new scientific research capabilities to the astronomical community. Software development for the VAO follows a lightweight framework that guides development of science applications and infrastructure. Challenges to be overcome include distributed development teams, part-time efforts, and highly constrained schedules. We describe the process we followed to conquer these challenges while developing Iris, the VAO application for analysis of 1-D astronomical spectral energy distributions (SEDs). Iris was successfully built and released in less than a year with a team distributed across four institutions. The project followed existing International Virtual Observatory Alliance inter-operability standards for spectral data and contributed a SED library as a by-product of the project. We emphasize lessons learned that will be folded into future development efforts. In our experience, a well-defined process that provides guidelines to ensure the project is cohesive and stays on track is key to success. Internal product deliveries with a planned test and feedback loop are critical. Release candidates are measured against use cases established early in the process, and provide the opportunity to assess priorities and make course corrections during development. Also key is the participation of a stakeholder such as a lead scientist who manages the technical questions, advises on priorities, and is actively involved as a lead tester. Finally, frequent scheduled communications (for example a bi-weekly tele-conference) assure issues are resolved quickly and the team is working toward a common vision.
NASA Technical Reports Server (NTRS)
Garrocq, C. A.; Hurley, M. J.; Dublin, M.
1973-01-01
A baseline implementation plan, including alternative implementation approaches for critical software elements and variants to the plan, was developed. The basic philosophy was aimed at: (1) a progressive release of capability for three major computing systems, (2) an end product that was a working tool, (3) giving participation to industry, government agencies, and universities, and (4) emphasizing the development of critical elements of the IPAD framework software. The results of these tasks indicate an IPAD first release capability 45 months after go-ahead, a five year total implementation schedule, and a total developmental cost of 2027 man-months and 1074 computer hours. Several areas of operational cost increases were identified mainly due to the impact of additional equipment needed and additional computer overhead. The benefits of an IPAD system were related mainly to potential savings in engineering man-hours, reduction of design-cycle calendar time, and indirect upgrading of product quality and performance.
Development of an Irrigation Scheduling Tool for the High Plains Region
NASA Astrophysics Data System (ADS)
Shulski, M.; Hubbard, K. G.; You, J.
2009-12-01
The High Plains Regional Climate Center (HPRCC) at the University of Nebraska is one of NOAA’s six regional climate centers in the U.S. Primary objectives of the HPRCC are to conduct applied climate research, engage in climate education and outreach, and increase the use and availability of climate information by developing value-added products. Scientists at the center are engaged in utilizing regional weather data to develop tools that can be used directly by area stakeholders, particularly for agricultural sectors. A new study is proposed that will combine NOAA products (short-term forecasts and seasonal outlooks of temperature and precipitation) with existing capabilities to construct an irrigation scheduling tool that can be used by producers in the region. This tool will make use of weather observations from the regional mesonet (specifically the AWDN, Automated Weather Data Network) and the nation-wide relational database and web portal (ACIS, Applied Climate Information System). The primary benefit to stakeholders will be a more efficient use of water and energy resources owing to the reduction of uncertainty in the timing of irrigation.
NASA Astrophysics Data System (ADS)
Tang, Dunbing; Dai, Min
2015-09-01
The traditional production planning and scheduling problems consider performance indicators like time, cost and quality as optimization objectives in manufacturing processes. However, environmentally-friendly factors like energy consumption of production have not been completely taken into consideration. Against this background, this paper addresses an approach to modify a given schedule generated by a production planning and scheduling system in a job shop floor, where machine tools can work at different cutting speeds. It can adjust the cutting speeds of the operations while keeping the original assignment and processing sequence of operations of each job fixed in order to obtain energy savings. First, the proposed approach, based on a mixed integer programming mathematical model, changes the total idle time of the given schedule to minimize energy consumption in the job shop floor while accepting the optimal solution of the scheduling objective, makespan. Then, a genetic-simulated annealing algorithm is used to explore the optimal solution due to the fact that the problem is strongly NP-hard. Finally, the effectiveness of the approach is performed smalland large-size instances, respectively. The experimental results show that the approach can save 5%-10% of the average energy consumption while accepting the optimal solution of the makespan in small-size instances. In addition, the average maximum energy saving ratio can reach to 13%. And it can save approximately 1%-4% of the average energy consumption and approximately 2.4% of the average maximum energy while accepting the near-optimal solution of the makespan in large-size instances. The proposed research provides an interesting point to explore an energy-aware schedule optimization for a traditional production planning and scheduling problem.
Multi-criteria evaluation methods in the production scheduling
NASA Astrophysics Data System (ADS)
Kalinowski, K.; Krenczyk, D.; Paprocka, I.; Kempa, W.; Grabowik, C.
2016-08-01
The paper presents a discussion on the practical application of different methods of multi-criteria evaluation in the process of scheduling in manufacturing systems. Among the methods two main groups are specified: methods based on the distance function (using metacriterion) and methods that create a Pareto set of possible solutions. The basic criteria used for scheduling were also described. The overall procedure of evaluation process in production scheduling was presented. It takes into account the actions in the whole scheduling process and human decision maker (HDM) participation. The specified HDM decisions are related to creating and editing a set of evaluation criteria, selection of multi-criteria evaluation method, interaction in the searching process, using informal criteria and making final changes in the schedule for implementation. According to need, process scheduling may be completely or partially automated. Full automatization is possible in case of metacriterion based objective function and if Pareto set is selected - the final decision has to be done by HDM.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Samaan, Nader A.; Milligan, Michael; Hunsaker, Matthew
This paper introduces a Production Cost Modeling (PCM) approach to evaluate the benefits of intra-hour scheduling between Balancing Authorities (BAs). The system operation is modeled in a three-stage sequential manner: day ahead (DA)-hour ahead (HA)-real time (RT). In addition to contingency reserve, each BA will need to carry out “up” and “down” load following and regulation reserve capacity requirements in the DA and HA time frames. In the real-time simulation, only contingency and regulation reserves are carried out as load following is deployed. To model current real-time operation with hourly schedules, a new constraint was introduced to force each BAmore » net exchange schedule deviation from HA schedules to be within NERC ACE limits. Case studies that investigate the benefits of moving from hourly exchange schedules between WECC BAs into 10-min exchange schedules under two different levels of wind and solar penetration (11% and 33%) are presented.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Samaan, Nader; Milligan, Michael; Hunsaker, Matt
This paper introduces a production cost modeling approach for evaluating the benefits of intra-hour scheduling among Balancing Authorities (BAs). System operation is modeled in a three-stage sequential manner: day ahead (DA)-hour ahead (HA) real time (RT). In addition to contingency reserve, each BA will need to carry out 'up' and 'down' load following and regulation reserve capacity requirements in the DA and HA time frames. In the RT simulation, only contingency and regulation reserves are carried out as load following is deployed. To model current RT operation with hourly schedules, a new constraint was introduced to force each BA netmore » exchange schedule deviation from HA schedules to be within North American Electric Reliability Corporation (NERC) area control error (ACE) limits. Case studies that investigate the benefits of moving from hourly exchange schedules between Western Electricity Coordinating Council (WECC) BAs into 10-minute exchange schedules under two different levels of wind and solar penetration (11% and 33%) are presented.« less
5 CFR 532.255 - Regular appropriated fund wage schedules in foreign areas.
Code of Federal Regulations, 2010 CFR
2010-01-01
... schedules shall provide rates of pay for nonsupervisory, leader, supervisory, and production facilitating employees. (b) Schedules shall be— (1) Computed on the basis of a simple average of all regular appropriated fund wage area schedules in effect on December 31; and (2) Effective on the first day of the first pay...
5 CFR 532.255 - Regular appropriated fund wage schedules in foreign areas.
Code of Federal Regulations, 2011 CFR
2011-01-01
... schedules shall provide rates of pay for nonsupervisory, leader, supervisory, and production facilitating employees. (b) Schedules shall be— (1) Computed on the basis of a simple average of all regular appropriated fund wage area schedules in effect on December 31; and (2) Effective on the first day of the first pay...
Code of Federal Regulations, 2011 CFR
2011-01-01
... COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.9... notifications, and amendments include: (a) Annual declaration on past activities (Schedule 1 chemical production during the previous calendar year); (b) Annual report on exports and imports of Schedule 1 chemicals from...
Short-term scheduling of an open-pit mine with multiple objectives
NASA Astrophysics Data System (ADS)
Blom, Michelle; Pearce, Adrian R.; Stuckey, Peter J.
2017-05-01
This article presents a novel algorithm for the generation of multiple short-term production schedules for an open-pit mine, in which several objectives, of varying priority, characterize the quality of each solution. A short-term schedule selects regions of a mine site, known as 'blocks', to be extracted in each week of a planning horizon (typically spanning 13 weeks). Existing tools for constructing these schedules use greedy heuristics, with little optimization. To construct a single schedule in which infrastructure is sufficiently utilized, with production grades consistently close to a desired target, a planner must often run these heuristics many times, adjusting parameters after each iteration. A planner's intuition and experience can evaluate the relative quality and mineability of different schedules in a way that is difficult to automate. Of interest to a short-term planner is the generation of multiple schedules, extracting available ore and waste in varying sequences, which can then be manually compared. This article presents a tool in which multiple, diverse, short-term schedules are constructed, meeting a range of common objectives without the need for iterative parameter adjustment.
DOT National Transportation Integrated Search
1979-11-01
Volume II is part of a four volume set documenting areas of research resulting from the development of the Automotive Manufacturing Assessment System (AMAS) for the DOT/Transportation Systems Center. AMAS was designed to assist in the evaluation of i...
Production of small diameter high-temperature-strength refractory metal wires
NASA Technical Reports Server (NTRS)
Petrasek, D. W.; Signorelli, R. A.; King, G. W.
1973-01-01
Special thermomechanical techniques (schedules) have been developed to produce small diameter wire from three refractory metal alloys: colombian base alloy, tantalum base alloy, and tungsten base alloy. High strengths of these wires indicate their potential for contributing increased strength to metallic composites.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-03
... phenylpropanolamine, expressed in grams of anhydrous acid or base, be established as follows: Proposed 2014 Basic... grams of levo-desoxyephedrine for use in a non-controlled, non-prescription product; 2,600,000 grams for methamphetamine mostly for conversion to a schedule III product; and 61,375 grams for methamphetamine (for sale...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-30
... INTERNATIONAL TRADE COMMISSION [Investigation Nos. 701-TA-350 and 731-TA-616 and 618 (Third Review)] Corrosion-Resistant Carbon Steel Flat Products From Germany and Korea; Scheduling of Full Five-Year Reviews... corrosion-resistant carbon steel flat products from Korea and the antidumping duty orders on corrosion...
Code of Federal Regulations, 2013 CFR
2013-01-01
...) You plan to increase the production, processing, or consumption of a Schedule 2 chemical by a plant... production, processing, or consumption of a Schedule 2 chemical by a declared plant site by 20 percent or... multipurpose activities; (v) Changes to the plant site's status relating to domestic transfer of the chemical...
Code of Federal Regulations, 2014 CFR
2014-01-01
...) You plan to increase the production, processing, or consumption of a Schedule 2 chemical by a plant... production, processing, or consumption of a Schedule 2 chemical by a declared plant site by 20 percent or... multipurpose activities; (v) Changes to the plant site's status relating to domestic transfer of the chemical...
Code of Federal Regulations, 2012 CFR
2012-01-01
...) You plan to increase the production, processing, or consumption of a Schedule 2 chemical by a plant... production, processing, or consumption of a Schedule 2 chemical by a declared plant site by 20 percent or... multipurpose activities; (v) Changes to the plant site's status relating to domestic transfer of the chemical...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-03
... Production Quotas for Schedule I and II Controlled Substances and Proposed Assessment of Annual Needs for the... the Controlled Substances Act (CSA) and assessment of annual needs for the list I chemicals ephedrine... proposed 2013 aggregate production quotas and assessment of annual needs, DEA has taken into account the...
Scheduling Onboard Processing for the Proposed HyspIRI Mission
NASA Technical Reports Server (NTRS)
Chien, Steve; Mclaren, David; Rabideau, Gregg; Mandl, Daniel; Hengemihle, Jerry
2011-01-01
The proposed Hyspiri mission is evaluating a X-band Direct Broadcast (DB) capability that would enable data to be delivered to ground stations virtually as it is acquired. However the HyspIRI VSWIR and TIR instruments will produce 1 Gbps data while the DB capability is 15 M bps for a 60x oversubscription. In order to address this data volume mismatch a DB concept has been developed thatdetermines which data to downlink based on both: 1. The type of surface the spacecraft is overflying and 2. Onboard processing of the data to detect events. For example when the spacecraft is overflying polar regions it might downlink a snow/ice product. Additionally the onboard software will search for thermal signatures indicative of a volcanic event or wild fire and downlink summary information (extent, spectra) when detected. The process of determining which products to generate when, based on request prioritization and onboard processing and downlink constraints is inherently a prioritized scheduling problem - we describe work to develop an automated solution to this problem.
NASA Astrophysics Data System (ADS)
Cram, Ana Catalina
As worldwide environmental awareness grow, alternative sources of energy have become important to mitigate climate change. Biogas in particular reduces greenhouse gas emissions that contribute to global warming and has the potential of providing 25% of the annual demand for natural gas in the U.S. In 2011, 55,000 metric tons of methane emissions were reduced and 301 metric tons of carbon dioxide emissions were avoided through the use of biogas alone. Biogas is produced by anaerobic digestion through the fermentation of organic material. It is mainly composed of methane with a rage of 50 to 80% in its concentration. Carbon dioxide covers 20 to 50% and small amounts of hydrogen, carbon monoxide and nitrogen. The biogas production systems are anaerobic digestion facilities and the optimal operation of an anaerobic digester requires the scheduling of all batches from multiple feedstocks during a specific time horizon. The availability times, biomass quantities, biogas production rates and storage decay rates must all be taken into account for maximal biogas production to be achieved during the planning horizon. Little work has been done to optimize the scheduling of different types of feedstock in anaerobic digestion facilities to maximize the total biogas produced by these systems. Therefore, in the present thesis, a new genetic algorithm is developed with the main objective of obtaining the optimal sequence in which different feedstocks will be processed and the optimal time to allocate to each feedstock in the digester with the main objective of maximizing the production of biogas considering different types of feedstocks, arrival times and decay rates. Moreover, all batches need to be processed in the digester in a specified time with the restriction that only one batch can be processed at a time. The developed algorithm is applied to 3 different examples and a comparison with results obtained in previous studies is presented.
NASA Astrophysics Data System (ADS)
Hsieh, Tsu-Pang; Cheng, Mei-Chuan; Dye, Chung-Yuan; Ouyang, Liang-Yuh
2011-01-01
In this article, we extend the classical economic production quantity (EPQ) model by proposing imperfect production processes and quality-dependent unit production cost. The demand rate is described by any convex decreasing function of the selling price. In addition, we allow for shortages and a time-proportional backlogging rate. For any given selling price, we first prove that the optimal production schedule not only exists but also is unique. Next, we show that the total profit per unit time is a concave function of price when the production schedule is given. We then provide a simple algorithm to find the optimal selling price and production schedule for the proposed model. Finally, we use a couple of numerical examples to illustrate the algorithm and conclude this article with suggestions for possible future research.
Environmental surveillance master sampling schedule
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bisping, L.E.
This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of themore » onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.« less
NASA Technical Reports Server (NTRS)
Bloom, H. L.
1977-01-01
The study elicited over 100 ideas for Space Processing. Of the elicited ideas, more than 20% involved processing of biologicals, or related medical and life sciences applications. Among these were High Purity Separation of Isoenzymes, and Development of Biorhythms applications data. Program planning for four products is outlined. Experimentation and testing resulted in definition of nearly 70 series of tests in ground-based laboratories, sounding rockets, etc., and space shuttle. Development schedules established timing and interrelationships of decisions involved in carrying these products to the point of production. The potential profitability of the four products is determined. Resources needed to achieve full scale production included use of shuttle for transportation, for which cost apportionment model was developed. R and D resources for the four products totalled $46,000,000 with Isoenzymes requiring the smallest expenditure, $4,000,000. A computerized profitability model (INVEST) was used to determine the measures of profitability of each product. Results build confidence that there will be a payoff.
Genesis of a flexible turning center
NASA Astrophysics Data System (ADS)
Sanclemente, Paul; French, Robert D.
GE - Aircraft Engines has designed, built, and is operating a flexible turning center for jet engine hardware. Although the plant is in the forefront of manufacturing technology development, it was intended from the start to be a production facility. So while there was much to learn from being involved in all phases of the project, meeting production schedules was, and is, key to its success. This paper reviews the early history of the project and ends with a view of its recent production status.
Proposed algorithm to improve job shop production scheduling using ant colony optimization method
NASA Astrophysics Data System (ADS)
Pakpahan, Eka KA; Kristina, Sonna; Setiawan, Ari
2017-12-01
This paper deals with the determination of job shop production schedule on an automatic environment. On this particular environment, machines and material handling system are integrated and controlled by a computer center where schedule were created and then used to dictate the movement of parts and the operations at each machine. This setting is usually designed to have an unmanned production process for a specified interval time. We consider here parts with various operations requirement. Each operation requires specific cutting tools. These parts are to be scheduled on machines each having identical capability, meaning that each machine is equipped with a similar set of cutting tools therefore is capable of processing any operation. The availability of a particular machine to process a particular operation is determined by the remaining life time of its cutting tools. We proposed an algorithm based on the ant colony optimization method and embedded them on matlab software to generate production schedule which minimize the total processing time of the parts (makespan). We test the algorithm on data provided by real industry and the process shows a very short computation time. This contributes a lot to the flexibility and timelines targeted on an automatic environment.
Ares I-X Roll Control System Development
NASA Technical Reports Server (NTRS)
Unger, Ronald J.; Massey, Edmund C.
2009-01-01
Project Managers often face challenging technical, schedule and budget issues. This presentation will explore how the Ares I-X Roll Control System Integrated Product Team (IPT) mitigated challenges such as concurrent engineering requirements and environments and evolving program processes, while successfully managing an aggressive project schedule and tight budget. IPT challenges also included communications and negotiations among inter- and intra-government agencies, including the US Air Force, NASA/MSFC Propulsion Engineering, LaRC, GRC, KSC, WSTF, and the Constellation Program. In order to successfully meet these challenges it was essential that the IPT define those items that most affected the schedule critical path, define early mitigation strategies to reduce technical, schedule, and budget risks, and maintain the end-product focus of an "unmanned test flight" context for the flight hardware. The makeup of the IPT and how it would function were also important considerations. The IPT consisted of NASA/MSFC (project management, engineering, and safety/quality) and contractors (Teledyne Brown Engineering and Pratt and Whitney Rocketdyne, who supplied heritage hardware experience). The early decision to have a small focused IPT working "badgelessly" across functional lines to eliminate functional stove-piping allowed for many more tasks to be done by fewer people. It also enhanced a sense of ownership of the products, while still being able to revert back to traditional roles in order to provide the required technical independence in design reviews and verification closures. This presentation will highlight several prominent issues and discuss how they were mitigated and the resulting Lessons Learned that might benefit other projects.
2016-11-01
systems engineering had better outcomes. For example, the Small Diameter Bomb Increment I program, which delivered within cost and schedule estimates ...its current portfolio. This portfolio has experienced cost growth of 48 percent since first full estimates and average delays in delivering initial...stable design, building and testing of prototypes, and demonstration of mature production processes. • Realistic cost estimate : Sound cost estimates
Scheduling for anesthesia at geographic locations remote from the operating room.
Dexter, Franklin; Wachtel, Ruth E
2014-08-01
Providing general anesthesia at locations away from the operating room, called remote locations, poses many medical and scheduling challenges. This review discusses how to schedule procedures at remote locations to maximize anesthesia productivity (see Video, Supplemental Digital Content 1). Anesthesia labour productivity can be maximized by assigning one or more 8-h or 10-h periods of allocated time every 2 weeks dedicated specifically to each remote specialty that has enough cases to fill those periods. Remote specialties can then schedule their cases themselves into their own allocated time. Periods of allocated time (called open, unblocked or first come first served time) can be used by remote locations that do not have their own allocated time. Unless cases are scheduled sequentially into allocated time, there will be substantial extra underutilized time (time during which procedures are not being performed and personnel sit idle even though staffing has been planned) and a concomitant reduction in percent productivity. Allocated time should be calculated on the basis of usage. Remote locations with sufficient hours of cases should be allocated time reserved especially for them in which to schedule their cases, with a maximum waiting time of 2 weeks, to achieve an average wait of 1 week.
Code of Federal Regulations, 2011 CFR
2011-01-01
... CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS Pt. 713, Supp. 2... following any calendar year in which the production, processing, or consumption of a Schedule 2 chemical... exports or imports of a Schedule 2 chemical by a plant site, trading company, or other person subject to...
Li, Shanlin; Li, Maoqin
2015-01-01
We consider an integrated production and distribution scheduling problem faced by a typical make-to-order manufacturer which relies on a third-party logistics (3PL) provider for finished product delivery to customers. In the beginning of a planning horizon, the manufacturer has received a set of orders to be processed on a single production line. Completed orders are delivered to customers by a finite number of vehicles provided by the 3PL company which follows a fixed daily or weekly shipping schedule such that the vehicles have fixed departure dates which are not part of the decisions. The problem is to find a feasible schedule that minimizes one of the following objective functions when processing times and weights are oppositely ordered: (1) the total weight of late orders and (2) the number of vehicles used subject to the condition that the total weight of late orders is minimum. We show that both problems are solvable in polynomial time.
Li, Shanlin; Li, Maoqin
2015-01-01
We consider an integrated production and distribution scheduling problem faced by a typical make-to-order manufacturer which relies on a third-party logistics (3PL) provider for finished product delivery to customers. In the beginning of a planning horizon, the manufacturer has received a set of orders to be processed on a single production line. Completed orders are delivered to customers by a finite number of vehicles provided by the 3PL company which follows a fixed daily or weekly shipping schedule such that the vehicles have fixed departure dates which are not part of the decisions. The problem is to find a feasible schedule that minimizes one of the following objective functions when processing times and weights are oppositely ordered: (1) the total weight of late orders and (2) the number of vehicles used subject to the condition that the total weight of late orders is minimum. We show that both problems are solvable in polynomial time. PMID:25785285
2011-04-13
On October 12, 2010, the President signed the Combat Methamphetamine Enhancement Act of 2010 (MEA). It establishes new requirements for mail-order distributors of scheduled listed chemical products. Mail-order distributors must now self-certify to DEA in order to sell scheduled listed chemical products at retail. Sales at retail are those sales intended for personal use; mail-order distributors that sell scheduled listed chemical products not intended for personal use, e.g., sale to a university, are not affected by the new law. This self-certification must include a statement that the mail-order distributor understands each of the requirements that apply under part 1314 and agrees to comply with these requirements. Additionally, mail-order distributors are now required to train their employees prior to self certification. DEA is promulgating this rule to incorporate the statutory provisions and make its regulations consistent with the new requirements and other existing regulations related to self-certification.
Software quality: Process or people
NASA Technical Reports Server (NTRS)
Palmer, Regina; Labaugh, Modenna
1993-01-01
This paper will present data related to software development processes and personnel involvement from the perspective of software quality assurance. We examine eight years of data collected from six projects. Data collected varied by project but usually included defect and fault density with limited use of code metrics, schedule adherence, and budget growth information. The data are a blend of AFSCP 800-14 and suggested productivity measures in Software Metrics: A Practioner's Guide to Improved Product Development. A software quality assurance database tool, SQUID, was used to store and tabulate the data.
Dembe, Allard E; Delbos, Rachel; Erickson, J Bianca; Banks, Steven M
2007-12-01
This study examines the effect of long-hour work schedules and nonstandard shift work (e.g., night and evening shifts) on the ability of injured workers to maintain productive employment following a workplace injury. Analyses were based on 13 years of data from the National Longitudinal Survey of Youth. Multivariate logistic regression analyses were performed with one of ten nonstandard schedules as the independent variable and a particular vocational consequences as the dependent variable. Vocational consequences included being unable to perform normal job duties, temporary job reassignment, working less than full time, filing a workers' compensation claim, and quitting or being fired because of the injury. Covariates in the regression model included age, gender, occupation, industry, and region. The most prominent effects of working a nonstandard schedule were a increased risk of being fired (OR = 1.81; 1.15-2.90 CI 95%), quitting (OR = 1.68; 1.20-2.36 CI 95%), or being unable to work full time (OR = 1.33; 1.08-1.64 CI 95%) following an injury, compared to injured workers in conventional schedules. Schedules involving overtime and long working hours generally had a greater impact on vocational consequences following a workplace injury than did schedules involving night, evening, and other nonstandard shift work. Occupational rehabilitation professionals need to consider the specific type of work schedule when developing effective return-to-work plans for injured workers. Special precautions need to be taken for workers returning to schedules that involve more than 12 h per day, 60 h per week, and long commutes.
Simplifying Facility and Event Scheduling: Saving Time and Money.
ERIC Educational Resources Information Center
Raasch, Kevin
2003-01-01
Describes a product called the Event Management System (EMS), a computer software program to manage facility and event scheduling. Provides example of the school district and university uses of EMS. Describes steps in selecting a scheduling-management system. (PKP)
WTO Dispute Settlement: Status of U.S. Compliance in Pending Cases
2010-01-29
meat , poultry meat , and rice, for 2008 and 2009.183 Brazil’s request was based on language in the Arbitrator’s report directing the United States to...subsidy commitments regarding various unscheduled products (e.g., cotton, oilseeds, protein meals) as well as three scheduled products (rice, poultry ... meat , and rice).148 By providing export subsidies both to unscheduled products and to scheduled products in excess of its reduction commitments, the
NASA Astrophysics Data System (ADS)
Zhadanovsky, Boris; Sinenko, Sergey
2018-03-01
Economic indicators of construction work, particularly in high-rise construction, are directly related to the choice of optimal number of machines. The shortage of machinery makes it impossible to complete the construction & installation work on scheduled time. Rates of performance of construction & installation works and labor productivity during high-rise construction largely depend on the degree of provision of construction project with machines (level of work mechanization). During calculation of the need for machines in construction projects, it is necessary to ensure that work is completed on scheduled time, increased level of complex mechanization, increased productivity and reduction of manual work, and improved usage and maintenance of machine fleet. The selection of machines and determination of their numbers should be carried out by using formulas presented in this work.
Unocal schedules field development off East Kalimantan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-12-07
Unocal Indonesia Ltd. has let a turnkey contract to PT Gema SemBrown (GSB) to build a platform to set in the deepest water yet off Indonesia. This paper reports on the contract, which is worth more than $40 million, and calls for GSB to engineer, procure, fabricate, install, and hook up Unocal's SA drilling and production platform in 335 ft of water in Serang field. Site is in Makassar Strait, about 25 miles off East Kalimantan. GSB in October began fabricating the Serang SA platform at its Sunda Strait fabrication yard in West Java, Indonesia. GSB is to complete themore » platform on a fast track schedule in time for installation in July 1993. The project includes two export trunk lines connecting Serang field with Unocal's Melahin field. Production will come ashore at Santan on East Kalimantan.« less
NASA Astrophysics Data System (ADS)
Wang, Li-Chih; Chen, Yin-Yann; Chen, Tzu-Li; Cheng, Chen-Yang; Chang, Chin-Wei
2014-10-01
This paper studies a solar cell industry scheduling problem, which is similar to traditional hybrid flowshop scheduling (HFS). In a typical HFS problem, the allocation of machine resources for each order should be scheduled in advance. However, the challenge in solar cell manufacturing is the number of machines that can be adjusted dynamically to complete the job. An optimal production scheduling model is developed to explore these issues, considering the practical characteristics, such as hybrid flowshop, parallel machine system, dedicated machines, sequence independent job setup times and sequence dependent job setup times. The objective of this model is to minimise the makespan and to decide the processing sequence of the orders/lots in each stage, lot-splitting decisions for the orders and the number of machines used to satisfy the demands in each stage. From the experimental results, lot-splitting has significant effect on shortening the makespan, and the improvement effect is influenced by the processing time and the setup time of orders. Therefore, the threshold point to improve the makespan can be identified. In addition, the model also indicates that more lot-splitting approaches, that is, the flexibility of allocating orders/lots to machines is larger, will result in a better scheduling performance.
5 CFR 532.263 - Special wage schedules for production facilitating positions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Special wage schedules for production facilitating positions. 532.263 Section 532.263 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PREVAILING RATE SYSTEMS Prevailing Rate Determinations § 532.263 Special wage...
9 CFR 50.21 - Schedule of payments.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Schedule of payments. 50.21 Section 50.21 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE COOPERATIVE CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES ANIMALS DESTROYED BECAUSE OF TUBERCULOSIS...
21 CFR 113.100 - Processing and production records.
Code of Federal Regulations, 2014 CFR
2014-04-01
... products, maximum fill-in or drained weight, or other critical factors specified in the scheduled process... end of the holding period; nature of container. (6) Food preservation methods wherein critical factors... scheduled processes used, including the thermal process, its associated critical factors, as well as other...
21 CFR 113.100 - Processing and production records.
Code of Federal Regulations, 2012 CFR
2012-04-01
... products, maximum fill-in or drained weight, or other critical factors specified in the scheduled process... end of the holding period; nature of container. (6) Food preservation methods wherein critical factors... scheduled processes used, including the thermal process, its associated critical factors, as well as other...
21 CFR 113.100 - Processing and production records.
Code of Federal Regulations, 2013 CFR
2013-04-01
... products, maximum fill-in or drained weight, or other critical factors specified in the scheduled process... end of the holding period; nature of container. (6) Food preservation methods wherein critical factors... scheduled processes used, including the thermal process, its associated critical factors, as well as other...
40 CFR 300.920 - Addition of products to Schedule.
Code of Federal Regulations, 2011 CFR
2011-07-01
... manufacturer of his decision in writing. (b) Surface washing agents, surface collecting agents, bioremediation... collecting agent, bioremediation agent, or miscellaneous oil spill control agent to the NCP Product Schedule... collecting agent, bioremediation agent, or miscellaneous oil spill control agent. On the basis of this data...
40 CFR 300.920 - Addition of products to Schedule.
Code of Federal Regulations, 2014 CFR
2014-07-01
... manufacturer of his decision in writing. (b) Surface washing agents, surface collecting agents, bioremediation... collecting agent, bioremediation agent, or miscellaneous oil spill control agent to the NCP Product Schedule... collecting agent, bioremediation agent, or miscellaneous oil spill control agent. On the basis of this data...
40 CFR 300.920 - Addition of products to Schedule.
Code of Federal Regulations, 2012 CFR
2012-07-01
... manufacturer of his decision in writing. (b) Surface washing agents, surface collecting agents, bioremediation... collecting agent, bioremediation agent, or miscellaneous oil spill control agent to the NCP Product Schedule... collecting agent, bioremediation agent, or miscellaneous oil spill control agent. On the basis of this data...
40 CFR 300.920 - Addition of products to Schedule.
Code of Federal Regulations, 2013 CFR
2013-07-01
... manufacturer of his decision in writing. (b) Surface washing agents, surface collecting agents, bioremediation... collecting agent, bioremediation agent, or miscellaneous oil spill control agent to the NCP Product Schedule... collecting agent, bioremediation agent, or miscellaneous oil spill control agent. On the basis of this data...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Fee schedule. 390.6 Section 390.6 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOOD SAFETY AND INSPECTION SERVICE ADMINISTRATIVE PROVISIONS FREEDOM OF INFORMATION AND PUBLIC INFORMATION § 390.6 Fee...
9 CFR 50.21 - Schedule of payments.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Schedule of payments. 50.21 Section 50.21 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE COOPERATIVE CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES ANIMALS DESTROYED BECAUSE OF TUBERCULOSIS...
9 CFR 50.21 - Schedule of payments.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Schedule of payments. 50.21 Section 50.21 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE COOPERATIVE CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES ANIMALS DESTROYED BECAUSE OF TUBERCULOSIS...
9 CFR 50.21 - Schedule of payments.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Schedule of payments. 50.21 Section 50.21 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE COOPERATIVE CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES ANIMALS DESTROYED BECAUSE OF TUBERCULOSIS...
9 CFR 50.21 - Schedule of payments.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Schedule of payments. 50.21 Section 50.21 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE COOPERATIVE CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES ANIMALS DESTROYED BECAUSE OF TUBERCULOSIS...
21 CFR 1314.155 - Suspension pending final order.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 1314.155 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE RETAIL SALE OF SCHEDULED LISTED CHEMICAL PRODUCTS Order to Show Cause § 1314.155 Suspension pending final order. (a) The Administrator may suspend the right to sell scheduled listed chemical products simultaneously with, or at any...
40 CFR 300.920 - Addition of products to Schedule.
Code of Federal Regulations, 2010 CFR
2010-07-01
... manufacturer of his decision in writing. (b) Surface washing agents, surface collecting agents, bioremediation... collecting agent, bioremediation agent, or miscellaneous oil spill control agent to the NCP Product Schedule... collecting agent, bioremediation agent, or miscellaneous oil spill control agent. On the basis of this data...
Modeling of a production system using the multi-agent approach
NASA Astrophysics Data System (ADS)
Gwiazda, A.; Sękala, A.; Banaś, W.
2017-08-01
The method that allows for the analysis of complex systems is a multi-agent simulation. The multi-agent simulation (Agent-based modeling and simulation - ABMS) is modeling of complex systems consisting of independent agents. In the case of the model of the production system agents may be manufactured pieces set apart from other types of agents like machine tools, conveyors or replacements stands. Agents are magazines and buffers. More generally speaking, the agents in the model can be single individuals, but you can also be defined as agents of collective entities. They are allowed hierarchical structures. It means that a single agent could belong to a certain class. Depending on the needs of the agent may also be a natural or physical resource. From a technical point of view, the agent is a bundle of data and rules describing its behavior in different situations. Agents can be autonomous or non-autonomous in making the decision about the types of classes of agents, class sizes and types of connections between elements of the system. Multi-agent modeling is a very flexible technique for modeling and model creating in the convention that could be adapted to any research problem analyzed from different points of views. One of the major problems associated with the organization of production is the spatial organization of the production process. Secondly, it is important to include the optimal scheduling. For this purpose use can approach multi-purposeful. In this regard, the model of the production process will refer to the design and scheduling of production space for four different elements. The program system was developed in the environment NetLogo. It was also used elements of artificial intelligence. The main agent represents the manufactured pieces that, according to previously assumed rules, generate the technological route and allow preprint the schedule of that line. Machine lines, reorientation stands, conveyors and transport devices also represent the other type of agent that are utilized in the described simulation. The article presents the idea of an integrated program approach and shows the resulting production layout as a virtual model. This model was developed in the NetLogo multi-agent program environment.
Forebody/Inlet of the Joint Strike Fighter Tested at Low Speeds
NASA Technical Reports Server (NTRS)
Johns, Albert L.
1998-01-01
As part of a national cooperative effort to develop a multinational fighter aircraft, a model of a Joint Strike Fighter concept was tested in several NASA Lewis Research Center wind tunnels at low speeds over a range of headwind velocities and model attitudes. This Joint Strike Fighter concept, which is scheduled to go into production in 2005, will greatly improve the range, capability, maneuverability, and survivability of fighter aircraft, and the production program could ultimately be worth $100 billion. The test program was a team effort between Lewis and Lockheed Martin Tactical Aircraft Systems. Testing was completed in September 1997, several weeks ahead of schedule, allowing Lockheed additional time to review the results and analysis data before the next test and resulting in significant cost savings for Lockheed. Several major milestones related to dynamic and steady-state data acquisition and overall model performance were reached during this model test. Results from this program will contribute to both the concept demonstration phase and the production aircraft.
SIRTF Science Operations System Design
NASA Technical Reports Server (NTRS)
Green, William
1999-01-01
SIRTF Science Operations System Design William B. Green Manager, SIRTF Science Center California Institute of Technology M/S 310-6 1200 E. California Blvd., Pasadena CA 91125 (626) 395 8572 Fax (626) 568 0673 bgreen@ipac.caltech.edu. The Space Infrared Telescope Facility (SIRTF) will be launched in December 2001, and perform an extended series of science observations at wavelengths ranging from 20 to 160 microns for five years or more. The California Institute of Technology has been selected as the home for the SIRTF Science Center (SSC). The SSC will be responsible for evaluating and selecting observation proposals, providing technical support to the science community, performing mission planning and science observation scheduling activities, instrument calibration during operations and instrument health monitoring, production of archival quality data products, and management of science research grants. The science payload consists of three instruments delivered by instrument Principal Investigators located at University of Arizona, Cornell, and Harvard Smithsonian Astrophysical Observatory. The SSC is responsible for design, development, and operation of the Science Operations System (SOS) which will support the functions assigned to the SSC by NASA. The SIRTF spacecraft, mission profile, and science instrument design have undergone almost ten years of refinement. SIRTF development and operations activities are highly cost constrained. The cost constraints have impacted the design of the SOS in several ways. The Science Operations System has been designed to incorporate a set of efficient, easy to use tools which will make it possible for scientists to propose observation sequences in a rapid and automated manner. The use of highly automated tools for requesting observations will simplify the long range observatory scheduling process, and the short term scheduling of science observations. Pipeline data processing will be highly automated and data-driven, utilizing a variety of tools developed at JPL, the instrument development teams, and Space Telescope Science Institute to automate processing. An incremental ground data system development approach has been adopted, featuring periodic deliveries that are validated with the flight hardware throughout the various phases of system level development and testing. This approach minimizes development time and decreases operations risk. This paper will describe the top level architecture of the SOS and the basic design concepts. A summary of the incremental development approach will be presented. Examples of the unique science user tools now under final development prior to the first proposal call scheduled for mid-2000 will be shown.
Constraint-based integration of planning and scheduling for space-based observatory management
NASA Technical Reports Server (NTRS)
Muscettola, Nicola; Smith, Steven F.
1994-01-01
Progress toward the development of effective, practical solutions to space-based observatory scheduling problems within the HSTS scheduling framework is reported. HSTS was developed and originally applied in the context of the Hubble Space Telescope (HST) short-term observation scheduling problem. The work was motivated by the limitations of the current solution and, more generally, by the insufficiency of classical planning and scheduling approaches in this problem context. HSTS has subsequently been used to develop improved heuristic solution techniques in related scheduling domains and is currently being applied to develop a scheduling tool for the upcoming Submillimeter Wave Astronomy Satellite (SWAS) mission. The salient architectural characteristics of HSTS and their relationship to previous scheduling and AI planning research are summarized. Then, some key problem decomposition techniques underlying the integrated planning and scheduling approach to the HST problem are described; research results indicate that these techniques provide leverage in solving space-based observatory scheduling problems. Finally, more recently developed constraint-posting scheduling procedures and the current SWAS application focus are summarized.
78 FR 17895 - Schedules of Controlled Substances: Placement of Alfaxalone into Schedule IV
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-25
... (Schedule IV under consideration), and midazolam. Since alfaxalone is a new veterinary product and has not...[alpha]-ol-11, 20-dione. Alfaxalone has a molecular formula of C 21 H 32 O 3 and a molecular weight of...
Project Success in Agile Development Software Projects
ERIC Educational Resources Information Center
Farlik, John T.
2016-01-01
Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…
Management of spruce-fir in even-aged stands in the central Rocky Mountains
Robert R. Alexander; Carleton B. Edminster
1980-01-01
Potential production of Engelmann spruce and subalpine fir in the central Rocky Mountains is simulated for vario.us combinations of stand density, site quality, ages, and thinning schedules. Such estimates are needed to project future development of stands managed in different ways for various uses.
NASA Technical Reports Server (NTRS)
Short, Nick, Jr.; Bedet, Jean-Jacques; Bodden, Lee; Boddy, Mark; White, Jim; Beane, John
1994-01-01
The Goddard Space Flight Center (GSFC) Distributed Active Archive Center (DAAC) has been operational since October 1, 1993. Its mission is to support the Earth Observing System (EOS) by providing rapid access to EOS data and analysis products, and to test Earth Observing System Data and Information System (EOSDIS) design concepts. One of the challenges is to ensure quick and easy retrieval of any data archived within the DAAC's Data Archive and Distributed System (DADS). Over the 15-year life of EOS project, an estimated several Petabytes (10(exp 15)) of data will be permanently stored. Accessing that amount of information is a formidable task that will require innovative approaches. As a precursor of the full EOS system, the GSFC DAAC with a few Terabits of storage, has implemented a prototype of a constraint-based task and resource scheduler to improve the performance of the DADS. This Honeywell Task and Resource Scheduler (HTRS), developed by Honeywell Technology Center in cooperation the Information Science and Technology Branch/935, the Code X Operations Technology Program, and the GSFC DAAC, makes better use of limited resources, prevents backlog of data, provides information about resources bottlenecks and performance characteristics. The prototype which is developed concurrently with the GSFC Version 0 (V0) DADS, models DADS activities such as ingestion and distribution with priority, precedence, resource requirements (disk and network bandwidth) and temporal constraints. HTRS supports schedule updates, insertions, and retrieval of task information via an Application Program Interface (API). The prototype has demonstrated with a few examples, the substantial advantages of using HTRS over scheduling algorithms such as a First In First Out (FIFO) queue. The kernel scheduling engine for HTRS, called Kronos, has been successfully applied to several other domains such as space shuttle mission scheduling, demand flow manufacturing, and avionics communications scheduling.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-30
... 1117-AB28 Schedules of Controlled Substances: Exempted Prescription Product; River Edge Pharmaceutical... new applications for exemption. DEA has received one new application for exemption for River Edge... application for exemption pursuant to the provisions of 21 CFR 1308.32 for: River Edge Pharmaceutical's...
27 CFR 40.478 - Disposition of cigarette papers and tubes and schedule.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 27 Alcohol, Tobacco Products and Firearms 2 2012-04-01 2011-04-01 true Disposition of cigarette... PRODUCTS, CIGARETTE PAPERS AND TUBES, AND PROCESSED TOBACCO Manufacture of Cigarette Papers and Tubes Claims by Manufacturers § 40.478 Disposition of cigarette papers and tubes and schedule. When so...
27 CFR 40.478 - Disposition of cigarette papers and tubes and schedule.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 27 Alcohol, Tobacco Products and Firearms 2 2014-04-01 2014-04-01 false Disposition of cigarette... PRODUCTS, CIGARETTE PAPERS AND TUBES, AND PROCESSED TOBACCO Manufacture of Cigarette Papers and Tubes Claims by Manufacturers § 40.478 Disposition of cigarette papers and tubes and schedule. When so...
27 CFR 40.478 - Disposition of cigarette papers and tubes and schedule.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 27 Alcohol, Tobacco Products and Firearms 2 2013-04-01 2013-04-01 false Disposition of cigarette... PRODUCTS, CIGARETTE PAPERS AND TUBES, AND PROCESSED TOBACCO Manufacture of Cigarette Papers and Tubes Claims by Manufacturers § 40.478 Disposition of cigarette papers and tubes and schedule. When so...
27 CFR 40.478 - Disposition of cigarette papers and tubes and schedule.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 27 Alcohol, Tobacco Products and Firearms 2 2011-04-01 2011-04-01 false Disposition of cigarette... PRODUCTS, CIGARETTE PAPERS AND TUBES, AND PROCESSED TOBACCO Manufacture of Cigarette Papers and Tubes Claims by Manufacturers § 40.478 Disposition of cigarette papers and tubes and schedule. When so...
27 CFR 40.478 - Disposition of cigarette papers and tubes and schedule.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 27 Alcohol, Tobacco Products and Firearms 2 2010-04-01 2010-04-01 false Disposition of cigarette... PRODUCTS, CIGARETTE PAPERS AND TUBES, AND PROCESSED TOBACCO Manufacture of Cigarette Papers and Tubes Claims by Manufacturers § 40.478 Disposition of cigarette papers and tubes and schedule. When so...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-19
... and Annual Fee Applicable to Derivative Securities Products January 12, 2010. On November 24, 2009... Services (``Fee Schedule'') to revise the listing and annual fees applicable to Derivative Securities... Schedule, the term ``Derivative Securities Products'' includes securities described in NYSE Arca Equities...
Construction of a parallel processor for simulating manipulators and other mechanical systems
NASA Technical Reports Server (NTRS)
Hannauer, George
1991-01-01
This report summarizes the results of NASA Contract NAS5-30905, awarded under phase 2 of the SBIR Program, for a demonstration of the feasibility of a new high-speed parallel simulation processor, called the Real-Time Accelerator (RTA). The principal goals were met, and EAI is now proceeding with phase 3: development of a commercial product. This product is scheduled for commercial introduction in the second quarter of 1992.
Design Change Model for Effective Scheduling Change Propagation Paths
NASA Astrophysics Data System (ADS)
Zhang, Hai-Zhu; Ding, Guo-Fu; Li, Rong; Qin, Sheng-Feng; Yan, Kai-Yin
2017-09-01
Changes in requirements may result in the increasing of product development project cost and lead time, therefore, it is important to understand how requirement changes propagate in the design of complex product systems and be able to select best options to guide design. Currently, a most approach for design change is lack of take the multi-disciplinary coupling relationships and the number of parameters into account integrally. A new design change model is presented to systematically analyze and search change propagation paths. Firstly, a PDS-Behavior-Structure-based design change model is established to describe requirement changes causing the design change propagation in behavior and structure domains. Secondly, a multi-disciplinary oriented behavior matrix is utilized to support change propagation analysis of complex product systems, and the interaction relationships of the matrix elements are used to obtain an initial set of change paths. Finally, a rough set-based propagation space reducing tool is developed to assist in narrowing change propagation paths by computing the importance of the design change parameters. The proposed new design change model and its associated tools have been demonstrated by the scheduling change propagation paths of high speed train's bogie to show its feasibility and effectiveness. This model is not only supportive to response quickly to diversified market requirements, but also helpful to satisfy customer requirements and reduce product development lead time. The proposed new design change model can be applied in a wide range of engineering systems design with improved efficiency.
Space tug point design study. Volume 4: Program requirements
NASA Technical Reports Server (NTRS)
1973-01-01
A study was conducted to determine the configuration of a space tug and to predict the performance parameters. The program plans and planning data generated in support of the tug development program are presented. The preliminary plans and supporting planning data emphasize the following requirements: (1) maintenance and refurbishment, (2) technology development, (3) production, (4) test facilities, (5) quality control, and (6) scheduling.
Joint Land Attack Cruise Missile Defense Elevated Netted Sensor System (JLENS)
2013-12-01
Initial Production $M - Millions of Dollars MILCON - Military Construction N /A - Not Applicable O&S - Operating and Support Oth - Other PAUC - Program...RDT&E - Research, Development, Test, and Evaluation SAR - Selected Acquisition Report Sch - Schedule Spt - Support TBD - To Be Determined TY - Then...completion, assess test results, correct short comings/deficiencies, and develop documentation to track and assess program status. On January 31
Present and future hydropower scheduling in Statkraft
NASA Astrophysics Data System (ADS)
Bruland, O.
2012-12-01
Statkraft produces close to 40 TWH in an average year and is one of the largest hydropower producers in Europe. For hydropower producers the scheduling of electricity generation is the key to success and this depend on optimal use of the water resources. The hydrologist and his forecasts both on short and on long terms are crucial to this success. The hydrological forecasts in Statkraft and most hydropower companies in Scandinavia are based on lumped models and the HBV concept. But before the hydrological model there is a complex system for collecting, controlling and correcting data applied in the models and the production scheduling and, equally important, routines for surveillance of the processes and manual intervention. Prior to the forecasting the states in the hydrological models are updated based on observations. When snow is present in the catchments snow surveys are an important source for model updating. The meteorological forecast is another premise provider to the hydrological forecast and to get as precise meteorological forecast as possible Statkraft hires resources from the governmental forecasting center. Their task is to interpret the meteorological situation, describe the uncertainties and if necessary use their knowledge and experience to manually correct the forecast in the hydropower production regions. This is one of several forecast applied further in the scheduling process. Both to be able to compare and evaluate different forecast providers and to ensure that we get the best available forecast, forecasts from different sources are applied. Some of these forecasts have undergone statistical corrections to reduce biases. The uncertainties related to the meteorological forecast have for a long time been approached and described by ensemble forecasts. But also the observations used for updating the model have a related uncertainty. Both to the observations itself and to how well they represent the catchment. Though well known, these uncertainties have thus far been handled superficially. Statkraft has initiated a program called ENKI to approach these issues. A part of this program is to apply distributed models for hydrological forecasting. Developing methodologies to handle uncertainties in the observations, the meteorological forecasts, the model itself and how to update the model with this information are other parts of the program. Together with energy price expectations and information about the state of the energy production system the hydrological forecast is input to the next step in the production scheduling both on short and long term. The long term schedule for reservoir filling is premise provider to the short term optimizing of water. The long term schedule is based on the actual reservoir levels, snow storages and a long history of meteorological observations and gives an overall schedule at a regional level. Within the regions a more detailed tool is used for short term optimizing of the hydropower production Each reservoir is scheduled taking into account restrictions in the water courses and cost of start and stop of aggregates. The value of the water is calculated for each reservoir and reflects the risk of water spillage. This compared to the energy price determines whether an aggregate will run or not. In a gradually more complex energy system with relatively lower regulated capacity this is an increasingly more challenging task.
Alaska North Slope regional gas hydrate production modeling forecasts
Wilson, S.J.; Hunter, R.B.; Collett, T.S.; Hancock, S.; Boswell, R.; Anderson, B.J.
2011-01-01
A series of gas hydrate development scenarios were created to assess the range of outcomes predicted for the possible development of the "Eileen" gas hydrate accumulation, North Slope, Alaska. Production forecasts for the "reference case" were built using the 2002 Mallik production tests, mechanistic simulation, and geologic studies conducted by the US Geological Survey. Three additional scenarios were considered: A "downside-scenario" which fails to identify viable production, an "upside-scenario" describes results that are better than expected. To capture the full range of possible outcomes and balance the downside case, an "extreme upside scenario" assumes each well is exceptionally productive.Starting with a representative type-well simulation forecasts, field development timing is applied and the sum of individual well forecasts creating the field-wide production forecast. This technique is commonly used to schedule large-scale resource plays where drilling schedules are complex and production forecasts must account for many changing parameters. The complementary forecasts of rig count, capital investment, and cash flow can be used in a pre-appraisal assessment of potential commercial viability.Since no significant gas sales are currently possible on the North Slope of Alaska, typical parameters were used to create downside, reference, and upside case forecasts that predict from 0 to 71??BM3 (2.5??tcf) of gas may be produced in 20 years and nearly 283??BM3 (10??tcf) ultimate recovery after 100 years.Outlining a range of possible outcomes enables decision makers to visualize the pace and milestones that will be required to evaluate gas hydrate resource development in the Eileen accumulation. Critical values of peak production rate, time to meaningful production volumes, and investments required to rule out a downside case are provided. Upside cases identify potential if both depressurization and thermal stimulation yield positive results. An "extreme upside" case captures the full potential of unconstrained development with widely spaced wells. The results of this study indicate that recoverable gas hydrate resources may exist in the Eileen accumulation and that it represents a good opportunity for continued research. ?? 2010 Elsevier Ltd.
Risk Mitigation for the Development of the New Ariane 5 On-Board Computer
NASA Astrophysics Data System (ADS)
Stransky, Arnaud; Chevalier, Laurent; Dubuc, Francois; Conde-Reis, Alain; Ledoux, Alain; Miramont, Philippe; Johansson, Leif
2010-08-01
In the frame of the Ariane 5 production, some equipment will become obsolete and need to be redesigned and redeveloped. This is the case for the On-Board Computer, which has to be completely redesigned and re-qualified by RUAG Space, as well as all its on-board software and associated development tools by ASTRIUM ST. This paper presents this obsolescence treatment, which has started in 2007 under an ESA contract, in the frame of ACEP and ARTA accompaniment programmes, and is very critical in technical term but also from schedule point of view: it gives the context and overall development plan, and details the risk mitigation actions agreed with ESA, especially those related to the development of the input/output ASIC, and also the on-board software porting and revalidation strategy. The efficiency of these risk mitigation actions has been proven by the outcome schedule; this development constitutes an up-to-date case for good practices, including some experience report and feedback for future other developments.
Assessment of the Impact of Scheduled Postmarketing Safety Summary Analyses on Regulatory Actions
Sekine, S; Pinnow, EE; Wu, E; Kurtzig, R; Hall, M; Dal Pan, GJ
2016-01-01
In addition to standard postmarketing drug safety monitoring, Section 915 of the Food and Drug Administration Amendments Act of 2007 (FDAAA) requires the US Food and Drug Administration (FDA) to conduct a summary analysis of adverse event reports to identify risks of a drug or biologic product 18 months after product approval, or after 10,000 patients have used the product, whichever is later. We assessed the extent to which these analyses identified new safety signals and resultant safety-related label changes. Among 458 newly approved products, 300 were the subjects of a scheduled analysis; a new safety signal that resulted in a safety-related label change was found for 11 of these products. Less than 2% of 713 safety-related label changes were based on the scheduled analyses. Our study suggests that the safety summary analyses provide only marginal value over other pharmacovigilance activities. PMID:26853718
The ODDI Odyssey: Developing and Integrating Operations for the International Space Station
NASA Astrophysics Data System (ADS)
Deal, Ryan W.
2002-01-01
International Space Station (ISS) comprise the deliverable products (OP-01 Reports) of the Boeing Operations Data Development and Integration (ODDI) Integrated Product Team (IPT) to the NASA customer. The ODDI IPT's mission is to exceed the customer's expectations by providing high-quality data and sound techniques for assembling and operating the ISS. strategies in order to streamline the generation of operations products that the Mission Operations Directorate (MOD) utilizes for its crew and ground operations procedures development. Just as for other business practices, operations is a transformation process, converting inputs (resources) into outputs (products) based on a strategy that works best for the established competitive priorities of the operations organization. product reviews, and supporting other ISS operations duties (such as Mission Evaluation Room support) must be balanced with meeting schedules for delivery of the ODDI IPT's OP-01 Reports in accordance with the ISS assembly sequence timeline.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Clean Air Act Amendments of 1990 Phaseout Schedule for Production of Ozone-Depleting Substances H Appendix H to Subpart A of Part 82... STRATOSPHERIC OZONE Production and Consumption Controls Pt. 82, Subpt. A, App. H Appendix H to Subpart A of Part...
Bidding-based autonomous process planning and scheduling
NASA Astrophysics Data System (ADS)
Gu, Peihua; Balasubramanian, Sivaram; Norrie, Douglas H.
1995-08-01
Improving productivity through computer integrated manufacturing systems (CIMS) and concurrent engineering requires that the islands of automation in an enterprise be completely integrated. The first step in this direction is to integrate design, process planning, and scheduling. This can be achieved through a bidding-based process planning approach. The product is represented in a STEP model with detailed design and administrative information including design specifications, batch size, and due dates. Upon arrival at the manufacturing facility, the product registered in the shop floor manager which is essentially a coordinating agent. The shop floor manager broadcasts the product's requirements to the machines. The shop contains autonomous machines that have knowledge about their functionality, capabilities, tooling, and schedule. Each machine has its own process planner and responds to the product's request in a different way that is consistent with its capabilities and capacities. When more than one machine offers certain process(es) for the same requirements, they enter into negotiation. Based on processing time, due date, and cost, one of the machines wins the contract. The successful machine updates its schedule and advises the product to request raw material for processing. The concept was implemented using a multi-agent system with the task decomposition and planning achieved through contract nets. The examples are included to illustrate the approach.
Han, Sanguk; Saba, Farzaneh; Lee, Sanghyun; Mohamed, Yasser; Peña-Mora, Feniosky
2014-07-01
It is not unusual to observe that actual schedule and quality performances are different from planned performances (e.g., schedule delay and rework) during a construction project. Such differences often result in production pressure (e.g., being pressed to work faster). Previous studies demonstrated that such production pressure negatively affects safety performance. However, the process by which production pressure influences safety performance, and to what extent, has not been fully investigated. As a result, the impact of production pressure has not been incorporated much into safety management in practice. In an effort to address this issue, this paper examines how production pressure relates to safety performance over time by identifying their feedback processes. A conceptual causal loop diagram is created to identify the relationship between schedule and quality performances (e.g., schedule delays and rework) and the components related to a safety program (e.g., workers' perceptions of safety, safety training, safety supervision, and crew size). A case study is then experimentally undertaken to investigate this relationship with accident occurrence with the use of data collected from a construction site; the case study is used to build a System Dynamics (SD) model. The SD model, then, is validated through inequality statistics analysis. Sensitivity analysis and statistical screening techniques further permit an evaluation of the impact of the managerial components on accident occurrence. The results of the case study indicate that schedule delays and rework are the critical factors affecting accident occurrence for the monitored project. Copyright © 2013 Elsevier Ltd. All rights reserved.
Simulation of textile manufacturing processes for planning, scheduling, and quality control purposes
NASA Astrophysics Data System (ADS)
Cropper, A. E.; Wang, Z.
1995-08-01
Simulation, as a management information tool, has been applied to engineering manufacture and assembly operations. The application of the principles to textile manufacturing (fiber to fabric) is discussed. The particular problems and solutions in applying the simulation software package to the yarn production processes are discussed with an indication of how the software achieves the production schedule. The system appears to have application in planning, scheduling, and quality assurance. The latter being a result of the traceability possibilities through a process involving mixing and splitting of material.
Effects of pressing schedule on formation of vertical density profile for MDF panels
Zhiyong Cai; James H. Muehl; Jerrold E. Winandy
2006-01-01
A fundamental understanding of mat consolidation during hot pressing will help to optimize the medium-density fiberboard (MDF) manufacturing process by increasing productivity, improving product quality, and enhancing durability. Effects of panel density, fiber moisture content (MC), and pressing schedule on formation of vertical density profile (VDP) during hot...
15 CFR 710.4 - Overview of scheduled chemicals and examples of affected industries.
Code of Federal Regulations, 2012 CFR
2012-01-01
... WEAPONS CONVENTION REGULATIONS GENERAL INFORMATION AND OVERVIEW OF THE CHEMICAL WEAPONS CONVENTION... Schedule 2 chemicals may be useful in the production of chemical weapons, they also have legitimate uses in... may be useful in the production of chemical weapons, they also have legitimate uses in areas such as...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-30
..., scheduling, promotion, production, and delivery of an NIC Virtual Conference entitled ``Handcuff Key to Door... conference through design, scheduling, promotion, and delivery; (2) In-studio and/or onsite production staff... in a project plan a detailed chart and description of a project management structure and team roles...
Code of Federal Regulations, 2010 CFR
2010-01-01
... Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.3 Initial declaration requirements for... declared facilities which are engaged in the production of Schedule 1 chemicals for purposes not prohibited...
Uncertainty analysis of an irrigation scheduling model for water management in crop production
USDA-ARS?s Scientific Manuscript database
Irrigation scheduling tools are critical to allow producers to manage water resources for crop production in an accurate and timely manner. To be useful, these tools need to be accurate, complete, and relatively reliable. The current work presents the uncertainty analysis and its results for the Mis...
Code of Federal Regulations, 2011 CFR
2011-01-01
... Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.3 Initial declaration requirements for... declared facilities which are engaged in the production of Schedule 1 chemicals for purposes not prohibited...
Constraint monitoring in TOSCA
NASA Technical Reports Server (NTRS)
Beck, Howard
1992-01-01
The Job-Shop Scheduling Problem (JSSP) deals with the allocation of resources over time to factory operations. Allocations are subject to various constraints (e.g., production precedence relationships, factory capacity constraints, and limits on the allowable number of machine setups) which must be satisfied for a schedule to be valid. The identification of constraint violations and the monitoring of constraint threats plays a vital role in schedule generation in terms of the following: (1) directing the scheduling process; and (2) informing scheduling decisions. This paper describes a general mechanism for identifying constraint violations and monitoring threats to the satisfaction of constraints throughout schedule generation.
15 CFR 713.7 - Deadlines for submission of Schedule 2 declarations, reports, and amendments.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS § 713.7 Deadlines for submission... (production, processing, or consumption of Schedule 2 chemicals during the previous calendar year); (b) Annual...
15 CFR 714.6 - Deadlines for submission of Schedule 3 declarations, reports, and amendments.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS § 714.6 Deadlines for submission... past activities (production of Schedule 3 chemicals during the previous calendar year); (b) Annual...
Code of Federal Regulations, 2010 CFR
2010-01-01
... Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 1 CHEMICALS § 712.9... notifications, and amendments include: (a) Annual declaration on past activities (Schedule 1 chemical production...
42 CFR 7.4 - Schedule of charges.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false Schedule of charges. 7.4 Section 7.4 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS DISTRIBUTION OF..., depending upon the cost of ingredients and the complexity of production. An up-to-date schedule of charges...
15 CFR 713.7 - Deadlines for submission of Schedule 2 declarations, reports, and amendments.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS § 713.7 Deadlines for submission... (production, processing, or consumption of Schedule 2 chemicals during the previous calendar year); (b) Annual...
15 CFR 714.6 - Deadlines for submission of Schedule 3 declarations, reports, and amendments.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS § 714.6 Deadlines for submission... past activities (production of Schedule 3 chemicals during the previous calendar year); (b) Annual...
Complex ambulatory settings demand scheduling systems.
Ross, K M
1998-01-01
Practice management systems are becoming more and more complex, as they are asked to integrate all aspects of patient and resource management. Although patient scheduling is a standard expectation in any ambulatory environment, facilities and equipment resource scheduling are additional functionalities of scheduling systems. Because these functions were not typically managed in manual patient scheduling, often the result was resource mismanagement, along with a potential negative impact on utilization, patient flow and provider productivity. As ambulatory organizations have become more seasoned users of practice management software, the value of resource scheduling has become apparent. Appointment scheduling within a fully integrated practice management system is recognized as an enhancement of scheduling itself and provides additional tools to manage other information needs. Scheduling, as one component of patient information management, provides additional tools in these areas.
2001-08-28
This final rule implements fee schedules for payment of parenteral and enteral nutrition (PEN) items and services furnished under the prosthetic device benefit, defined in section 1861(s)(8) of the Social Security Act. The authority for establishing these fee schedules is provided by the Balanced Budget Act of 1997, which amended the Social Security Act at section 1842(s). Section 1842(s) of the Social Security Act specifies that statewide or other area wide fee schedules may be implemented for the following items and services still subject to the reasonable charge payment methodology: medical supplies; home dialysis supplies and equipment; therapeutic shoes; parenteral and enteral nutrients, equipment, and supplies; electromyogram devices; salivation devices; blood products; and transfusion medicine. This final rule describes changes made to the proposed fee schedule payment methodology for these items and services and provides that the fee schedules for PEN items and services are effective for all covered items and services furnished on or after January 1, 2002. Fee schedules will not be implemented for electromyogram devices and salivation devices at this time since these items are not covered by Medicare. In addition, fee schedules will not be implemented for medical supplies, home dialysis supplies and equipment, therapeutic shoes, blood products, and transfusion medicine at this time since the data required to establish these fee schedules are inadequate.
Simulation/Emulation Techniques: Compressing Schedules With Parallel (HW/SW) Development
NASA Technical Reports Server (NTRS)
Mangieri, Mark L.; Hoang, June
2014-01-01
NASA has always been in the business of balancing new technologies and techniques to achieve human space travel objectives. NASA's Kedalion engineering analysis lab has been validating and using many contemporary avionics HW/SW development and integration techniques, which represent new paradigms to NASA's heritage culture. Kedalion has validated many of the Orion HW/SW engineering techniques borrowed from the adjacent commercial aircraft avionics solution space, inserting new techniques and skills into the Multi - Purpose Crew Vehicle (MPCV) Orion program. Using contemporary agile techniques, Commercial-off-the-shelf (COTS) products, early rapid prototyping, in-house expertise and tools, and extensive use of simulators and emulators, NASA has achieved cost effective paradigms that are currently serving the Orion program effectively. Elements of long lead custom hardware on the Orion program have necessitated early use of simulators and emulators in advance of deliverable hardware to achieve parallel design and development on a compressed schedule.
1991-03-01
Cliffs, New Jersey, 1989. Merritt, Dennis, "Forward Chaining in Prolog," Al Expert, v.7 November 1986. Minsky , Marvin ., "A Framework for Representing... Minsky , Marvin , (editor), Semantic Information Processing, MIT Press, 1968. Rychener, M. D., Production Systems as a Programming Language for Artificial
Historical Mass, Power, Schedule, and Cost Growth for NASA Spacecraft
NASA Technical Reports Server (NTRS)
Hayhurst, Marc R.; Bitten, Robert E.; Shinn, Stephen A.; Judnick, Daniel C.; Hallgrimson, Ingrid E.; Youngs, Megan A.
2016-01-01
Although spacecraft developers have been moving towards standardized product lines as the aerospace industry has matured, NASA's continual need to push the cutting edge of science to accomplish unique, challenging missions can still lead to spacecraft resource growth over time. This paper assesses historical mass, power, cost, and schedule growth for multiple NASA spacecraft from the last twenty years and compares to industry reserve guidelines to understand where the guidelines may fall short. Growth is assessed from project start to launch, from the time of the preliminary design review (PDR) to launch and from the time of the critical design review (CDR) to launch. Data is also assessed not just at the spacecraft bus level, but also at the subsystem level wherever possible, to help obtain further insight into possible drivers of growth. Potential recommendations to minimize spacecraft mass, power, cost, and schedule growth for future missions are also discussed.
NASA Technical Reports Server (NTRS)
Chapman, K. B.; Cox, C. M.; Thomas, C. W.; Cuevas, O. O.; Beckman, R. M.
1994-01-01
The Flight Dynamics Facility (FDF) at the NASA Goddard Space Flight Center (GSFC) generates numerous products for NASA-supported spacecraft, including the Tracking and Data Relay Satellites (TDRS's), the Hubble Space Telescope (HST), the Extreme Ultraviolet Explorer (EUVE), and the space shuttle. These products include orbit determination data, acquisition data, event scheduling data, and attitude data. In most cases, product generation involves repetitive execution of many programs. The increasing number of missions supported by the FDF has necessitated the use of automated systems to schedule, execute, and quality assure these products. This automation allows the delivery of accurate products in a timely and cost-efficient manner. To be effective, these systems must automate as many repetitive operations as possible and must be flexible enough to meet changing support requirements. The FDF Orbit Determination Task (ODT) has implemented several systems that automate product generation and quality assurance (QA). These systems include the Orbit Production Automation System (OPAS), the New Enhanced Operations Log (NEOLOG), and the Quality Assurance Automation Software (QA Tool). Implementation of these systems has resulted in a significant reduction in required manpower, elimination of shift work and most weekend support, and improved support quality, while incurring minimal development cost. This paper will present an overview of the concepts used and experiences gained from the implementation of these automation systems.
Evaluation of Selected Chemical Processes for Production of Low-cost Silicon, Phase 3
NASA Technical Reports Server (NTRS)
Blocher, J. M., Jr.; Browning, M. F.
1979-01-01
The construction of the 50 MT Si/year experimental process system development unit was deferred until FY 1980, and the fluidized bed, zinc vaporizer, by-product condenser, and electrolytic cell were combined with auxiliary units, capable of supporting 8-hour batchwise operation, to form the process development unit (PDU), which is scheduled to be in operation by October 1, 1979. The design of the PDU and objectives of its operation are discussed. Experimental program support activities described relate to: (1) a wetted-wall condensor; (2) fluidized-bed modeling; (3) zinc chloride electrolysis; and (4) zinc vaporizer.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Longhouser, G.A. Jr.
Human beings are diurnal species, normally active by day and asleep by night. Yet over thirty million Americans struggle with work schedules that include an off-normal work effort. The railroads, law enforcement, health services, Department of Defense, factory workers, chemical plants and public services, communications and utility workers must provide some form of around-the-clock effort. Shift work has been around since the advent of recorded history. There has always been a need for some type of off-normal service and assistance. The impact of shift work is replete with tales and factual evidence of an increased personnel error rate; disorders, bothmore » personal and family, and of course, increased accident events. In recent memory, the Three Mile Island Nuclear Plant incident, Union Carbide`s explosion in Bhopal, and the Chernobyl Nuclear Plant catastrophe all occurred during off-normal working hours. Yet management overall has done little to correct the production-driven twelve hour, seven day week shift mentality of the nineteenth century. Most schedules in use today are nothing more than cosmetic variations of the old production schedules. This could be driven by a management consideration of the worker`s response to change coupled with a reluctant buy-in of responsibility for the effects of change. Florida Power Corporation has developed for its nuclear security force, a unique work schedule which attempts to employ the sound principles of circadian rhythms coupled with a comprehensive training program to counter the problems associated with shift work. The results over the last four years have seen a marked reduction in the generic problems of personnel errors, absenteeism, unscheduled overtime and turnover rates. Utilization and understanding of this scheduling process for rotational shift work needs to be assessed to determine if the benefits are site specific or provide an expected response to the problems of shift work.« less
NASA Technical Reports Server (NTRS)
Liebowitz, Jay; Krishnamurthy, Vijaya; Rodens, Ira; Houston, Chapman; Liebowitz, Alisa; Baek, Seung; Radko, Joe; Zeide, Janet
1996-01-01
Scheduling has become an increasingly important element in today's society and workplace. Within the NASA environment, scheduling is one of the most frequently performed and challenging functions. Towards meeting NASA's scheduling needs, a research version of a generic expert scheduling system architecture and toolkit has been developed. This final report describes the development and testing of GUESS (Generically Used Expert Scheduling System).
Lessons learned in deploying software estimation technology and tools
NASA Technical Reports Server (NTRS)
Panlilio-Yap, Nikki; Ho, Danny
1994-01-01
Developing a software product involves estimating various project parameters. This is typically done in the planning stages of the project when there is much uncertainty and very little information. Coming up with accurate estimates of effort, cost, schedule, and reliability is a critical problem faced by all software project managers. The use of estimation models and commercially available tools in conjunction with the best bottom-up estimates of software-development experts enhances the ability of a product development group to derive reasonable estimates of important project parameters. This paper describes the experience of the IBM Software Solutions (SWS) Toronto Laboratory in selecting software estimation models and tools and deploying their use to the laboratory's product development groups. It introduces the SLIM and COSTAR products, the software estimation tools selected for deployment to the product areas, and discusses the rationale for their selection. The paper also describes the mechanisms used for technology injection and tool deployment, and concludes with a discussion of important lessons learned in the technology and tool insertion process.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-07
... needs for the List I chemicals ephedrine, pseudoephedrine, and phenylpropanolamine, expressed in grams...,000 g Methamphetamine 3,912,500 g [987,500 grams of levo-desoxyephedrine for use in a non-controlled, non- prescription product; 2,863,750 grams for methamphetamine mostly for conversion to a schedule III...
Reducing NPR 7120.5D to Practice: Preparing for a Life-Cycle Review
NASA Technical Reports Server (NTRS)
Taylor, Randall L.
2008-01-01
In March 2007, NASA issued revised rules for space flight project management, NPR 7120.5D, 'NASA Space Flight Program and Project Management Requirements.' Central to the new rules was the construct of Key Decision Points, maturity gates that the project team must pass in order to continue development. In order that the KDP decision be fully informed, the NPR required, as entrance criteria for the gate, the generation and delivery of specified planning, technical, and cost/schedule documents (gate products) and a life-cycle review, the Preliminary Design Review. Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. Key actions were taken to proactively interact with the SRB, produce high-quality gate products with stakeholder review, generate review presentation materials, and handle a myriad of supporting logistical functions. A review preparation team was established, including a Review Captain and leads for documentation, information systems, and logistics, and their roles, responsibilities and task assignments were identified. Aids were produced, including a detailed review preparation schedule and a comprehensive gate products production table. Institutional support was leveraged early and often. Implementation strategy reflected the needs of a nationally-distributed team, as well as applicable export control and IT security requirements. This paper gives a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project PMSR and PDR preparation and execution activities, including positive and negative lessons learned, and identifies recommendations for future NASA (and non-NASA) project teams.
NASA Astrophysics Data System (ADS)
Chawla, Viveak Kumar; Chanda, Arindam Kumar; Angra, Surjit
2018-03-01
The flexible manufacturing system (FMS) constitute of several programmable production work centers, material handling systems (MHSs), assembly stations and automatic storage and retrieval systems. In FMS, the automatic guided vehicles (AGVs) play a vital role in material handling operations and enhance the performance of the FMS in its overall operations. To achieve low makespan and high throughput yield in the FMS operations, it is highly imperative to integrate the production work centers schedules with the AGVs schedules. The Production schedule for work centers is generated by application of the Giffler and Thompson algorithm under four kind of priority hybrid dispatching rules. Then the clonal selection algorithm (CSA) is applied for the simultaneous scheduling to reduce backtracking as well as distance travel of AGVs within the FMS facility. The proposed procedure is computationally tested on the benchmark FMS configuration from the literature and findings from the investigations clearly indicates that the CSA yields best results in comparison of other applied methods from the literature.
The Interactive Effects of Rules on Teaching Timetable Flexibility and Resource Utilization.
ERIC Educational Resources Information Center
Wesson, David A.
1995-01-01
Effect of administrative rules concerning scheduling on college faculty's productivity is examined. Three potential effects are that rules interact with other rules to produce rigidity; scheduling changes cause greater disruption as rules and rigidity increase; and at some point, rules prohibit creation of a workable schedule for teaching facility…
Code of Federal Regulations, 2010 CFR
2010-01-01
... Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS Pt. 713, Supp. 2... following any calendar year in which the production, processing, or consumption of a Schedule 2 chemical...
39 CFR Appendix A to Subpart A of... - Mail Classification Schedule
Code of Federal Regulations, 2014 CFR
2014-07-01
... 39 Postal Service 1 2014-07-01 2014-07-01 false Mail Classification Schedule A Appendix A to Subpart A of Part 3020 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL PRODUCT LISTS Mail Classification Schedule Pt. 3020, Subpt. A, App. A Appendix A to Subpart A of Part 3020—Mail Classification...
50 CFR 260.70 - Schedule of fees.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Schedule of fees. 260.70 Section 260.70... Products for Human Consumption Fees and Charges § 260.70 Schedule of fees. (a) Unless otherwise provided in a written agreement between the applicant and the Secretary, the fees to be charged and collected...
Operating room management and operating room productivity: the case of Germany.
Berry, Maresi; Berry-Stölzle, Thomas; Schleppers, Alexander
2008-09-01
We examine operating room productivity on the example of hospitals in Germany with independent anesthesiology departments. Linked to anesthesiology group literature, we use the ln(Total Surgical Time/Total Anesthesiologists Salary) as a proxy for operating room productivity. We test the association between operating room productivity and different structural, organizational and management characteristics based on survey data from 87 hospitals. Our empirical analysis links improved operating room productivity to greater operating room capacity, appropriate scheduling behavior and management methods to realign interests. From this analysis, the enforcing jurisdiction and avoiding advance over-scheduling appear to be the implementable tools for improving operating room productivity.
Research and Design on a Product Data Definition System of Semiconductor Packaging Industry
NASA Astrophysics Data System (ADS)
Shi, Jinfei; Ma, Qingyao; Zhou, Yifan; Chen, Ruwen
2017-12-01
This paper develops a product data definition (PDD) system for a semiconductor packaging and testing company with independent intellectual property rights. The new PDD system can solve the problems such as, the effective control of production plans, the timely feedback of production processes, and the efficient schedule of resources. Firstly, this paper introduces the general requirements of the PDD system and depicts the operation flow and the data flow of the PDD system. Secondly, the overall design scheme of the PDD system is put forward. After that, the physical data model is developed using the Power Designer15.0 tool, and the database system is built. Finally, the function realization and running effects of the PDD system are analysed. The successful operation of the PDD system can realize the information flow among various production departments of the enterprise to meet the standard of the enterprise manufacturing integration and improve the efficiency of production management.
Dynamic Scheduling for Veterans Health Administration Patients using Geospatial Dynamic Overbooking.
Adams, Stephen; Scherer, William T; White, K Preston; Payne, Jason; Hernandez, Oved; Gerber, Mathew S; Whitehead, N Peter
2017-10-12
The Veterans Health Administration (VHA) is plagued by abnormally high no-show and cancellation rates that reduce the productivity and efficiency of its medical outpatient clinics. We address this issue by developing a dynamic scheduling system that utilizes mobile computing via geo-location data to estimate the likelihood of a patient arriving on time for a scheduled appointment. These likelihoods are used to update the clinic's schedule in real time. When a patient's arrival probability falls below a given threshold, the patient's appointment is canceled. This appointment is immediately reassigned to another patient drawn from a pool of patients who are actively seeking an appointment. The replacement patients are prioritized using their arrival probability. Real-world data were not available for this study, so synthetic patient data were generated to test the feasibility of the design. The method for predicting the arrival probability was verified on a real set of taxicab data. This study demonstrates that dynamic scheduling using geo-location data can reduce the number of unused appointments with minimal risk of double booking resulting from incorrect predictions. We acknowledge that there could be privacy concerns with regards to government possession of one's location and offer strategies for alleviating these concerns in our conclusion.
Minimizing metastatic risk in radiotherapy fractionation schedules
NASA Astrophysics Data System (ADS)
Badri, Hamidreza; Ramakrishnan, Jagdish; Leder, Kevin
2015-11-01
Metastasis is the process by which cells from a primary tumor disperse and form new tumors at distant anatomical locations. The treatment and prevention of metastatic cancer remains an extremely challenging problem. This work introduces a novel biologically motivated objective function to the radiation optimization community that takes into account metastatic risk instead of the status of the primary tumor. In this work, we consider the problem of developing fractionated irradiation schedules that minimize production of metastatic cancer cells while keeping normal tissue damage below an acceptable level. A dynamic programming framework is utilized to determine the optimal fractionation scheme. We evaluated our approach on a breast cancer case using the heart and the lung as organs-at-risk (OAR). For small tumor α /β values, hypo-fractionated schedules were optimal, which is consistent with standard models. However, for relatively larger α /β values, we found the type of schedule depended on various parameters such as the time when metastatic risk was evaluated, the α /β values of the OARs, and the normal tissue sparing factors. Interestingly, in contrast to standard models, hypo-fractionated and semi-hypo-fractionated schedules (large initial doses with doses tapering off with time) were suggested even with large tumor α/β values. Numerical results indicate the potential for significant reduction in metastatic risk.
48 CFR 11.402 - Factors to consider in establishing schedules.
Code of Federal Regulations, 2013 CFR
2013-10-01
... REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Delivery or Performance Schedules 11.402 Factors to...) Industry practices; (3) Market conditions; (4) Transportation time; (5) Production time; (6) Capabilities...
48 CFR 11.402 - Factors to consider in establishing schedules.
Code of Federal Regulations, 2010 CFR
2010-10-01
... REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Delivery or Performance Schedules 11.402 Factors to...) Industry practices; (3) Market conditions; (4) Transportation time; (5) Production time; (6) Capabilities...
48 CFR 11.402 - Factors to consider in establishing schedules.
Code of Federal Regulations, 2011 CFR
2011-10-01
... REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Delivery or Performance Schedules 11.402 Factors to...) Industry practices; (3) Market conditions; (4) Transportation time; (5) Production time; (6) Capabilities...
48 CFR 11.402 - Factors to consider in establishing schedules.
Code of Federal Regulations, 2014 CFR
2014-10-01
... REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Delivery or Performance Schedules 11.402 Factors to...) Industry practices; (3) Market conditions; (4) Transportation time; (5) Production time; (6) Capabilities...
48 CFR 11.402 - Factors to consider in establishing schedules.
Code of Federal Regulations, 2012 CFR
2012-10-01
... REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Delivery or Performance Schedules 11.402 Factors to...) Industry practices; (3) Market conditions; (4) Transportation time; (5) Production time; (6) Capabilities...
Stegemann, S; Baeyens, J-P; Becker, R; Maio, M; Bresciani, M; Shreeves, T; Ecker, F; Gogol, M
2014-06-01
Drugs represent the most common intervention strategy for managing acute and chronic medical conditions. In light of demographic change and the increasing age of patients, the classic model of drug research and development by the pharmaceutical industry and drug prescription by physicians is reaching its limits. Different stakeholders, e.g. industry, regulatory authorities, health insurance systems, physicians etc., have at least partially differing interests regarding the process of healthcare provision. The primary responsibility for the correct handling of medication and adherence to treatment schedules lies with the recipient of a drug-based therapy, i.e. the patient. It is thus necessary to interactively involve elderly patients, as well as the other stakeholders, in the development of medication and medication application devices, and in clinical trials. This approach will provide the basis for developing a strategy that better meets patients' needs, thus resulting in improved adherence to treatment schedules and better therapeutic outcomes.
A procedure for forecasting western larch seed crops
Arthur L. Roe
1966-01-01
Successful regeneration depends upon good coordination between seed production and seedbed preparation. To aid forest managers in scheduling seedbed preparation, a simple sequential sampling plan for estimating potential cone crops as much as a year in advance of the seed fall was developed and is described herein. With advance knowledge of the cone crop prospects, the...
A Quantitative Analysis of Open Source Software's Acceptability as Production-Quality Code
ERIC Educational Resources Information Center
Fischer, Michael
2011-01-01
The difficulty in writing defect-free software has been long acknowledged both by academia and industry. A constant battle occurs as developers seek to craft software that works within aggressive business schedules and deadlines. Many tools and techniques are used in attempt to manage these software projects. Software metrics are a tool that has…
Lightning Arrestor Connectors Production Readiness
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marten, Steve; Linder, Kim; Emmons, Jim
2008-10-20
The Lightning Arrestor Connector (LAC), part “M”, presented opportunities to improve the processes used to fabricate LACs. The A## LACs were the first production LACs produced at the KCP, after the product was transferred from Pinnellas. The new LAC relied on the lessons learned from the A## LACs; however, additional improvements were needed to meet the required budget, yield, and schedule requirements. Improvement projects completed since 2001 include Hermetic Connector Sealing Improvement, Contact Assembly molding Improvement, development of a second vendor for LAC shells, general process improvement, tooling improvement, reduction of the LAC production cycle time, and documention of themore » LAC granule fabrication process. This report summarizes the accomplishments achieved in improving the LAC Production Readiness.« less
Alaska Imagery (GOES-WEST) - Satellite Services Division / Office of
-- Dissemination Schedules METEOSAT MTSAT-1R POES -- Satellite Operations -- Satellite Status Pre-Processing Status Pre-Processing -- Dissemination Schedules Original SSD Links SSD Fire Products Precipitation
Hawaii Imagery (GOES-WEST) - Satellite Services Division / Office of
-- Dissemination Schedules METEOSAT MTSAT-1R POES -- Satellite Operations -- Satellite Status Pre-Processing Status Pre-Processing -- Dissemination Schedules Original SSD Links SSD Fire Products Precipitation
Large project experiences with object-oriented methods and reuse
NASA Technical Reports Server (NTRS)
Wessale, William; Reifer, Donald J.; Weller, David
1992-01-01
The SSVTF (Space Station Verification and Training Facility) project is completing the Preliminary Design Review of a large software development using object-oriented methods and systematic reuse. An incremental developmental lifecycle was tailored to provide early feedback and guidance on methods and products, with repeated attention to reuse. Object oriented methods were formally taught and supported by realistic examples. Reuse was readily accepted and planned by the developers. Schedule and budget issues were handled by agreements and work sharing arranged by the developers.
42 CFR 414.20 - Formula for computing fee schedule amounts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 3 2010-10-01 2010-10-01 false Formula for computing fee schedule amounts. 414.20... Other Practitioners § 414.20 Formula for computing fee schedule amounts. (a) Participating supplier. The... computed as the product of the following amounts: (1) The RVUs for the service. (2) The GAF for the fee...
1993-09-01
goal ( Heizer , Render , and Stair, 1993:94). Integer Prgronmming. Integer programming is a general purpose approach used to optimally solve job shop...Scheduling," Operations Research Journal. 29, No 4: 646-667 (July-August 1981). Heizer , Jay, Barry Render and Ralph M. Stair, Jr. Production and Operations
Advanced construction management for lunar base construction - Surface operations planner
NASA Technical Reports Server (NTRS)
Kehoe, Robert P.
1992-01-01
The study proposes a conceptual solution and lays the framework for developing a new, sophisticated and intelligent tool for a lunar base construction crew to use. This concept integrates expert systems for critical decision making, virtual reality for training, logistics and laydown optimization, automated productivity measurements, and an advanced scheduling tool to form a unique new planning tool. The concept features extensive use of computers and expert systems software to support the actual work, while allowing the crew to control the project from the lunar surface. Consideration is given to a logistics data base, laydown area management, flexible critical progress scheduler, video simulation of assembly tasks, and assembly information and tracking documentation.
Alternative Work Schedules Increase Employee Satisfaction.
ERIC Educational Resources Information Center
Turney, John R.; Cohen, Stanley L.
1983-01-01
Facets of alternative work schedules (AWS) are discussed: importance of employee control, possible negative consequences, AWS handbook, time monitoring systems, and treatment of exceptions. AWS' effect on productivity and motivation is examined. (SK)
Scheduling revisited workstations in integrated-circuit fabrication
NASA Technical Reports Server (NTRS)
Kline, Paul J.
1992-01-01
The cost of building new semiconductor wafer fabrication factories has grown rapidly, and a state-of-the-art fab may cost 250 million dollars or more. Obtaining an acceptable return on this investment requires high productivity from the fabrication facilities. This paper describes the Photo Dispatcher system which was developed to make machine-loading recommendations on a set of key fab machines. Dispatching policies that generally perform well in job shops (e.g., Shortest Remaining Processing Time) perform poorly for workstations such as photolithography which are visited several times by the same lot of silicon wafers. The Photo Dispatcher evaluates the history of workloads throughout the fab and identifies bottleneck areas. The scheduler then assigns priorities to lots depending on where they are headed after photolithography. These priorities are designed to avoid starving bottleneck workstations and to give preference to lots that are headed to areas where they can be processed with minimal waiting. Other factors considered by the scheduler to establish priorities are the nearness of a lot to the end of its process flow and the time that the lot has already been waiting in queue. Simulations that model the equipment and products in one of Texas Instrument's wafer fabs show the Photo Dispatcher can produce a 10 percent improvement in the time required to fabricate integrated circuits.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beckner, B.L.; Xong, X.
1995-12-31
A method for optimizing the net present value of a full field development by varying the placement and sequence of production wells is presented. This approach is automated and combines an economics package and Mobil`s in-house simulator, PEGASUS, within a simulated annealing optimization engine. A novel framing of the well placement and scheduling problem as a classic {open_quotes}travelling salesman problem{close_quotes} is required before optimization via simulated annealing can be applied practically. An example of a full field development using this technique shows that non-uniform well spacings are optimal (from an NPV standpoint) when the effects of well interference and variablemore » reservoir properties are considered. Examples of optimizing field NPV with variable well costs also show that non-uniform wells spacings are optimal. Project NPV increases of 25 to 30 million dollars were shown using the optimal, nonuniform development versus reasonable, uniform developments. The ability of this technology to deduce these non-uniform well spacings opens up many potential applications that should materially impact the economic performance of field developments.« less
Balancing Authority Cooperation Concepts - Intra-Hour Scheduling
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hunsaker, Matthew; Samaan, Nader; Milligan, Michael
2013-03-29
The overall objective of this study was to understand, on an Interconnection-wide basis, the effects intra-hour scheduling compared to hourly scheduling. Moreover, the study sought to understand how the benefits of intra-hour scheduling would change by altering the input assumptions in different scenarios. This report describes results of three separate scenarios with differing key assumptions and comparing the production costs between hourly scheduling and 10-minute scheduling performance. The different scenarios were chosen to provide insight into how the estimated benefits might change by altering input assumptions. Several key assumptions were different in the three scenarios, however most assumptions were similarmore » and/or unchanged among the scenarios.« less
Schedule of controlled substances; placement of fospropofol into schedule IV. Final rule.
2009-10-06
With the issuance of this final rule, the Deputy Administrator of the Drug Enforcement Administration (DEA) places the substance fospropofol, including its salts, isomers and salts of isomers whenever the existence of such salts, isomers, and salts of isomers is possible, into schedule IV of the Controlled Substances Act (CSA). As a result of this rule, the regulatory controls and criminal sanctions of schedule IV will be applicable to the manufacture, distribution, dispensing, importation, and exportation of fospropofol and products containing fospropofol.
Mousavi, Maryam; Yap, Hwa Jen; Musa, Siti Nurmaya; Tahriri, Farzad; Md Dawal, Siti Zawiah
2017-01-01
Flexible manufacturing system (FMS) enhances the firm's flexibility and responsiveness to the ever-changing customer demand by providing a fast product diversification capability. Performance of an FMS is highly dependent upon the accuracy of scheduling policy for the components of the system, such as automated guided vehicles (AGVs). An AGV as a mobile robot provides remarkable industrial capabilities for material and goods transportation within a manufacturing facility or a warehouse. Allocating AGVs to tasks, while considering the cost and time of operations, defines the AGV scheduling process. Multi-objective scheduling of AGVs, unlike single objective practices, is a complex and combinatorial process. In the main draw of the research, a mathematical model was developed and integrated with evolutionary algorithms (genetic algorithm (GA), particle swarm optimization (PSO), and hybrid GA-PSO) to optimize the task scheduling of AGVs with the objectives of minimizing makespan and number of AGVs while considering the AGVs' battery charge. Assessment of the numerical examples' scheduling before and after the optimization proved the applicability of all the three algorithms in decreasing the makespan and AGV numbers. The hybrid GA-PSO produced the optimum result and outperformed the other two algorithms, in which the mean of AGVs operation efficiency was found to be 69.4, 74, and 79.8 percent in PSO, GA, and hybrid GA-PSO, respectively. Evaluation and validation of the model was performed by simulation via Flexsim software.
Yap, Hwa Jen; Musa, Siti Nurmaya; Tahriri, Farzad; Md Dawal, Siti Zawiah
2017-01-01
Flexible manufacturing system (FMS) enhances the firm’s flexibility and responsiveness to the ever-changing customer demand by providing a fast product diversification capability. Performance of an FMS is highly dependent upon the accuracy of scheduling policy for the components of the system, such as automated guided vehicles (AGVs). An AGV as a mobile robot provides remarkable industrial capabilities for material and goods transportation within a manufacturing facility or a warehouse. Allocating AGVs to tasks, while considering the cost and time of operations, defines the AGV scheduling process. Multi-objective scheduling of AGVs, unlike single objective practices, is a complex and combinatorial process. In the main draw of the research, a mathematical model was developed and integrated with evolutionary algorithms (genetic algorithm (GA), particle swarm optimization (PSO), and hybrid GA-PSO) to optimize the task scheduling of AGVs with the objectives of minimizing makespan and number of AGVs while considering the AGVs’ battery charge. Assessment of the numerical examples’ scheduling before and after the optimization proved the applicability of all the three algorithms in decreasing the makespan and AGV numbers. The hybrid GA-PSO produced the optimum result and outperformed the other two algorithms, in which the mean of AGVs operation efficiency was found to be 69.4, 74, and 79.8 percent in PSO, GA, and hybrid GA-PSO, respectively. Evaluation and validation of the model was performed by simulation via Flexsim software. PMID:28263994
Optimal Day-Ahead Scheduling of a Hybrid Electric Grid Using Weather Forecasts
2013-12-01
ahead scheduling, Weather forecast , Wind power , Photovoltaic Power 15. NUMBER OF PAGES 107 16. PRICE CODE 17. SECURITY CLASSIFICATION OF...cost can be reached by accurately anticipating the future renewable power productions. This thesis suggests the use of weather forecasts to establish...reached by accurately anticipating the future renewable power productions. This thesis suggests the use of weather forecasts to establish day-ahead
Modeling and control for closed environment plant production systems
NASA Technical Reports Server (NTRS)
Fleisher, David H.; Ting, K. C.; Janes, H. W. (Principal Investigator)
2002-01-01
A computer program was developed to study multiple crop production and control in controlled environment plant production systems. The program simulates crop growth and development under nominal and off-nominal environments. Time-series crop models for wheat (Triticum aestivum), soybean (Glycine max), and white potato (Solanum tuberosum) are integrated with a model-based predictive controller. The controller evaluates and compensates for effects of environmental disturbances on crop production scheduling. The crop models consist of a set of nonlinear polynomial equations, six for each crop, developed using multivariate polynomial regression (MPR). Simulated data from DSSAT crop models, previously modified for crop production in controlled environments with hydroponics under elevated atmospheric carbon dioxide concentration, were used for the MPR fitting. The model-based predictive controller adjusts light intensity, air temperature, and carbon dioxide concentration set points in response to environmental perturbations. Control signals are determined from minimization of a cost function, which is based on the weighted control effort and squared-error between the system response and desired reference signal.
Lessons Learned from Deploying an Analytical Task Management Database
NASA Technical Reports Server (NTRS)
O'Neil, Daniel A.; Welch, Clara; Arceneaux, Joshua; Bulgatz, Dennis; Hunt, Mitch; Young, Stephen
2007-01-01
Defining requirements, missions, technologies, and concepts for space exploration involves multiple levels of organizations, teams of people with complementary skills, and analytical models and simulations. Analytical activities range from filling a To-Be-Determined (TBD) in a requirement to creating animations and simulations of exploration missions. In a program as large as returning to the Moon, there are hundreds of simultaneous analysis activities. A way to manage and integrate efforts of this magnitude is to deploy a centralized database that provides the capability to define tasks, identify resources, describe products, schedule deliveries, and generate a variety of reports. This paper describes a web-accessible task management system and explains the lessons learned during the development and deployment of the database. Through the database, managers and team leaders can define tasks, establish review schedules, assign teams, link tasks to specific requirements, identify products, and link the task data records to external repositories that contain the products. Data filters and spreadsheet export utilities provide a powerful capability to create custom reports. Import utilities provide a means to populate the database from previously filled form files. Within a four month period, a small team analyzed requirements, developed a prototype, conducted multiple system demonstrations, and deployed a working system supporting hundreds of users across the aeros pace community. Open-source technologies and agile software development techniques, applied by a skilled team enabled this impressive achievement. Topics in the paper cover the web application technologies, agile software development, an overview of the system's functions and features, dealing with increasing scope, and deploying new versions of the system.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alan Black; Arnis Judzis
2004-10-01
The industry cost shared program aims to benchmark drilling rates of penetration in selected simulated deep formations and to significantly improve ROP through a team development of aggressive diamond product drill bit--fluid system technologies. Overall the objectives are as follows: Phase 1--Benchmark ''best in class'' diamond and other product drilling bits and fluids and develop concepts for a next level of deep drilling performance; Phase 2--Develop advanced smart bit-fluid prototypes and test at large scale; and Phase 3--Field trial smart bit-fluid concepts, modify as necessary and commercialize products. As of report date, TerraTek has concluded all major preparations for themore » high pressure drilling campaign. Baker Hughes encountered difficulties in providing additional pumping capacity before TerraTek's scheduled relocation to another facility, thus the program was delayed further to accommodate the full testing program.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-25
...)] Galvanized Steel Wire From China and Mexico; Scheduling of the Final Phase of Countervailing Duty and... galvanized steel wire, provided for in subheading 7217.20 of the Harmonized Tariff Schedule of the United... merchandise as galvanized steel wire which is a cold- drawn carbon quality steel product in coils, of solid...
29 CFR 1610.15 - Schedule of fees and method of payment for services rendered.
Code of Federal Regulations, 2011 CFR
2011-07-01
.../programmer salary apportionable to the search based on the rates listed in paragraph (c)(1) of this section... OPPORTUNITY COMMISSION AVAILABILITY OF RECORDS Production or Disclosure Under 5 U.S.C. 552 § 1610.15 Schedule... the fee schedule set forth in paragraph (c) of this section as follows: (1) When records are requested...
The Development of Patient Scheduling Groups for an Effective Appointment System
2016-01-01
Summary Background Patient access to care and long wait times has been identified as major problems in outpatient delivery systems. These aspects impact medical staff productivity, service quality, clinic efficiency, and health-care cost. Objectives This study proposed to redesign existing patient types into scheduling groups so that the total cost of clinic flow and scheduling flexibility was minimized. The optimal scheduling group aimed to improve clinic efficiency and accessibility. Methods The proposed approach used the simulation optimization technique and was demonstrated in a Primary Care physician clinic. Patient type included, emergency/urgent care (ER/UC), follow-up (FU), new patient (NP), office visit (OV), physical exam (PE), and well child care (WCC). One scheduling group was designed for this physician. The approach steps were to collect physician treatment time data for each patient type, form the possible scheduling groups, simulate daily clinic flow and patient appointment requests, calculate costs of clinic flow as well as appointment flexibility, and find the scheduling group that minimized the total cost. Results The cost of clinic flow was minimized at the scheduling group of four, an 8.3% reduction from the group of one. The four groups were: 1. WCC, 2. OV, 3. FU and ER/UC, and 4. PE and NP. The cost of flexibility was always minimized at the group of one. The total cost was minimized at the group of two. WCC was considered separate and the others were grouped together. The total cost reduction was 1.3% from the group of one. Conclusions This study provided an alternative method of redesigning patient scheduling groups to address the impact on both clinic flow and appointment accessibility. Balance between them ensured the feasibility to the recognized issues of patient service and access to care. The robustness of the proposed method on the changes of clinic conditions was also discussed. PMID:27081406
Single-machine group scheduling problems with deteriorating and learning effect
NASA Astrophysics Data System (ADS)
Xingong, Zhang; Yong, Wang; Shikun, Bai
2016-07-01
The concepts of deteriorating jobs and learning effects have been individually studied in many scheduling problems. However, most studies considering the deteriorating and learning effects ignore the fact that production efficiency can be increased by grouping various parts and products with similar designs and/or production processes. This phenomenon is known as 'group technology' in the literature. In this paper, a new group scheduling model with deteriorating and learning effects is proposed, where learning effect depends not only on job position, but also on the position of the corresponding job group; deteriorating effect depends on its starting time of the job. This paper shows that the makespan and the total completion time problems remain polynomial optimal solvable under the proposed model. In addition, a polynomial optimal solution is also presented to minimise the maximum lateness problem under certain agreeable restriction.
NASA Technical Reports Server (NTRS)
1977-01-01
Concepts developed for both LEO and GEO construction of photovoltaic and thermal engine satellites are analyzed. Topics discussed include: satellite construction; crew scheduling; crew jobs and organizations; operator productivity rating; constructability rating; transportation systems for cargo launch, refueling operations, personnel transport, and orbit transfer; collision analysis, cost analysis, and radiation evironment and effects.
Chapter 5:Drying and heat sterilization of maple lumber for structural uses
William T. Simpson; Xiping Wang
2005-01-01
Traditional hardwood lumber drying processes were developed for appearance-type products such as furniture, cabinetry, and millwork. This means that air-drying practices were managed to minimize the chemical and fungal stains that occur in white woods such as maple, as well as surface checking that is common in some species. It also means that the kiln schedules which...
KC-46A Tanker Modernization (KC-46A)
2013-12-01
LRIP - Low Rate Initial Production $M - Millions of Dollars MILCON - Military Construction N /A - Not Applicable O&S - Operating and Support Oth - Other...Related Qty - Quantity RDT&E - Research, Development, Test, and Evaluation SAR - Selected Acquisition Report Sch - Schedule Spt - Support TBD - To Be...attributes, data correctness , data availability, and consistent data processing specified in the applicable joint and system integrated
Wear Improvement of Tools in the Cold Forging Process for Long Hex Flange Nuts.
Hsia, Shao-Yi; Shih, Po-Yueh
2015-09-25
Cold forging has played a critical role in fasteners and has been widely used in automotive production, manufacturing, aviation and 3C (Computer, Communication, and Consumer electronics). Despite its extensive use in fastener forming and die design, operator experience and trial and error make it subjective and unreliable owing to the difficulty of controlling the development schedule. This study used finite element analysis to establish and simulate wear in automotive repair fastener manufacturing dies based on actual process conditions. The places on a die that wore most quickly were forecast, with the stress levels obtained being substituted into the Archard equation to calculate die wear. A 19.87% improvement in wear optimization occurred by applying the Taguchi quality method to the new design. Additionally, a comparison of actual manufacturing data to simulations revealed a nut forging size error within 2%, thereby demonstrating the accuracy of this theoretical analysis. Finally, SEM micrographs of the worn surfaces on the upper punch indicate that the primary wear mechanism on the cold forging die for long hex flange nuts was adhesive wear. The results can simplify the development schedule, reduce the number of trials and further enhance production quality and die life.
NASA Astrophysics Data System (ADS)
Dao, Son Duy; Abhary, Kazem; Marian, Romeo
2017-06-01
Integration of production planning and scheduling is a class of problems commonly found in manufacturing industry. This class of problems associated with precedence constraint has been previously modeled and optimized by the authors, in which, it requires a multidimensional optimization at the same time: what to make, how many to make, where to make and the order to make. It is a combinatorial, NP-hard problem, for which no polynomial time algorithm is known to produce an optimal result on a random graph. In this paper, the further development of Genetic Algorithm (GA) for this integrated optimization is presented. Because of the dynamic nature of the problem, the size of its solution is variable. To deal with this variability and find an optimal solution to the problem, GA with new features in chromosome encoding, crossover, mutation, selection as well as algorithm structure is developed herein. With the proposed structure, the proposed GA is able to "learn" from its experience. Robustness of the proposed GA is demonstrated by a complex numerical example in which performance of the proposed GA is compared with those of three commercial optimization solvers.
Wear Improvement of Tools in the Cold Forging Process for Long Hex Flange Nuts
Hsia, Shao-Yi; Shih, Po-Yueh
2015-01-01
Cold forging has played a critical role in fasteners and has been widely used in automotive production, manufacturing, aviation and 3C (Computer, Communication, and Consumer electronics). Despite its extensive use in fastener forming and die design, operator experience and trial and error make it subjective and unreliable owing to the difficulty of controlling the development schedule. This study used finite element analysis to establish and simulate wear in automotive repair fastener manufacturing dies based on actual process conditions. The places on a die that wore most quickly were forecast, with the stress levels obtained being substituted into the Archard equation to calculate die wear. A 19.87% improvement in wear optimization occurred by applying the Taguchi quality method to the new design. Additionally, a comparison of actual manufacturing data to simulations revealed a nut forging size error within 2%, thereby demonstrating the accuracy of this theoretical analysis. Finally, SEM micrographs of the worn surfaces on the upper punch indicate that the primary wear mechanism on the cold forging die for long hex flange nuts was adhesive wear. The results can simplify the development schedule, reduce the number of trials and further enhance production quality and die life. PMID:28793589
Overview of Research Transition Products
NASA Technical Reports Server (NTRS)
Robinson, John
2014-01-01
Demonstrate increased, more consistent use of Performance- Based Navigation (PBN). Accelerate transfer of NASA scheduling and spacing technologies for inclusion in late mid-term NAS. During high-fidelity human-in-the-loop simulations of Terminal Sequencing and Spacing, air traffic controllers have significantly improved their use of PBN procedures during busy traffic periods without increased workload. Executed an aggressive, short timeframe development schedule. Developed TSS prototype based upon FAA operational systems. Conducted multiple joint FAA/NASA human-in-the-loop simulations. Performed repeated incremental deliveries of tech transfer material to non-traditional RTT stakeholders. Will continue to participate in later phases of FAA acquisition process. ATD-1 transferred Terminal Sequencing and Spacing (TSS) technologies to the FAA. TSS enables routine use of underutilized advanced avionics and PBN procedures. Potential benefits to airlines operating at initial TSS sites estimated to be $300-400M/year. FAA is planning for an initial capability in the NAS in 2018.
Engineering a Successful Mission: Lessons from the Lunar Reconnaissance Orbiter
NASA Technical Reports Server (NTRS)
Everett, David F.
2011-01-01
Schedule pressure is common in the commercial world, where late delivery of a product means delayed income and loss of profit. 12 Research spacecraft developed by NASA, on the other hand, tend to be driven by the high cost of launch vehicles and the public scrutiny of failure-- the primary driver is ensuring proper operation in space for a system that cannot be retrieved for repair. The Lunar Reconnaissance Orbiter (LRO) development faced both schedule pressure and high visibility. The team had to balance the strong push to meet a launch date against the need to ensure that this first mission for Exploration succeeded. This paper will provide an overview of the mission from concept through its first year of operation and explore some of the challenges the systems engineering team faced taking a mission from preliminary design review to pre-ship review in 3 years.
Solving a Production Scheduling Problem by Means of Two Biobjective Metaheuristic Procedures
NASA Astrophysics Data System (ADS)
Toncovich, Adrián; Oliveros Colay, María José; Moreno, José María; Corral, Jiménez; Corral, Rafael
2009-11-01
Production planning and scheduling problems emphasize the need for the availability of management tools that can help to assure proper service levels to customers, maintaining, at the same time, the production costs at acceptable levels and maximizing the utilization of the production facilities. In this case, a production scheduling problem that arises in the context of the activities of a company dedicated to the manufacturing of furniture for children and teenagers is addressed. Two bicriteria metaheuristic procedures are proposed to solve the sequencing problem in a production equipment that constitutes the bottleneck of the production process of the company. The production scheduling problem can be characterized as a general flow shop with sequence dependant setup times and additional inventory constraints. Two objectives are simultaneously taken into account when the quality of the candidate solutions is evaluated: the minimization of completion time of all jobs, or makespan, and the minimization of the total flow time of all jobs. Both procedures are based on a local search strategy that responds to the structure of the simulated annealing metaheuristic. In this case, both metaheuristic approaches generate a set of solutions that provides an approximation to the optimal Pareto front. In order to evaluate the performance of the proposed techniques a series of experiments was conducted. After analyzing the results, it can be said that the solutions provided by both approaches are adequate from the viewpoint of the quality as well as the computational effort involved in their generation. Nevertheless, a further refinement of the proposed procedures should be implemented with the aim of facilitating a quasi-automatic definition of the solution parameters.
Agent-Based Simulations for Project Management
NASA Technical Reports Server (NTRS)
White, J. Chris; Sholtes, Robert M.
2011-01-01
Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.
Scheduling multicore workload on shared multipurpose clusters
NASA Astrophysics Data System (ADS)
Templon, J. A.; Acosta-Silva, C.; Flix Molina, J.; Forti, A. C.; Pérez-Calero Yzquierdo, A.; Starink, R.
2015-12-01
With the advent of workloads containing explicit requests for multiple cores in a single grid job, grid sites faced a new set of challenges in workload scheduling. The most common batch schedulers deployed at HEP computing sites do a poor job at multicore scheduling when using only the native capabilities of those schedulers. This paper describes how efficient multicore scheduling was achieved at the sites the authors represent, by implementing dynamically-sized multicore partitions via a minimalistic addition to the Torque/Maui batch system already in use at those sites. The paper further includes example results from use of the system in production, as well as measurements on the dependence of performance (especially the ramp-up in throughput for multicore jobs) on node size and job size.
Application of decentralized cooperative problem solving in dynamic flexible scheduling
NASA Astrophysics Data System (ADS)
Guan, Zai-Lin; Lei, Ming; Wu, Bo; Wu, Ya; Yang, Shuzi
1995-08-01
The object of this study is to discuss an intelligent solution to the problem of task-allocation in shop floor scheduling. For this purpose, the technique of distributed artificial intelligence (DAI) is applied. Intelligent agents (IAs) are used to realize decentralized cooperation, and negotiation is realized by using message passing based on the contract net model. Multiple agents, such as manager agents, workcell agents, and workstation agents, make game-like decisions based on multiple criteria evaluations. This procedure of decentralized cooperative problem solving makes local scheduling possible. And by integrating such multiple local schedules, dynamic flexible scheduling for the whole shop floor production can be realized.
Techniques for cash management in scheduling manufacturing operations
NASA Astrophysics Data System (ADS)
Morady Gohareh, Mehdy; Shams Gharneh, Naser; Ghasemy Yaghin, Reza
2017-06-01
The objective in traditional scheduling is usually time based. Minimizing the makespan, total flow times, total tardi costs, etc. are instances of these objectives. In manufacturing, processing each job entails a cost paying and price receiving. Thus, the objective should include some notion of managing the flow of cash. We have defined two new objectives: maximization of average and minimum available cash. For single machine scheduling, it is demonstrated that scheduling jobs in decreasing order of profit ratios maximizes the former and improves productivity. Moreover, scheduling jobs in increasing order of costs and breaking ties in decreasing order of prices maximizes the latter and creates protection against financial instability.
Integrated flexible manufacturing program for manufacturing automation and rapid prototyping
NASA Technical Reports Server (NTRS)
Brooks, S. L.; Brown, C. W.; King, M. S.; Simons, W. R.; Zimmerman, J. J.
1993-01-01
The Kansas City Division of Allied Signal Inc., as part of the Integrated Flexible Manufacturing Program (IFMP), is developing an integrated manufacturing environment. Several systems are being developed to produce standards and automation tools for specific activities within the manufacturing environment. The Advanced Manufacturing Development System (AMDS) is concentrating on information standards (STEP) and product data transfer; the Expert Cut Planner system (XCUT) is concentrating on machining operation process planning standards and automation capabilities; the Advanced Numerical Control system (ANC) is concentrating on NC data preparation standards and NC data generation tools; the Inspection Planning and Programming Expert system (IPPEX) is concentrating on inspection process planning, coordinate measuring machine (CMM) inspection standards and CMM part program generation tools; and the Intelligent Scheduling and Planning System (ISAPS) is concentrating on planning and scheduling tools for a flexible manufacturing system environment. All of these projects are working together to address information exchange, standardization, and information sharing to support rapid prototyping in a Flexible Manufacturing System (FMS) environment.
Advanced tools for irrigation scheduling
USDA-ARS?s Scientific Manuscript database
Irrigated agriculture is needed to meet demands for agricultural products, but farmers are challenged with limited quality water supplies, environmental and regulatory policies climate variability, and competition for water from other sectors. Scientific irrigation scheduling could help allay these ...
The resource envelope as a basis for space station management system scheduling
NASA Technical Reports Server (NTRS)
Bush, Joy; Critchfield, Anna
1987-01-01
The Platform Management System (PMS) Resource Envelope Scheduling System (PRESS) expert system prototype developed for space station scheduling is described. The purpose of developing the prototype was too investigate the resource envelope concept in a practical scheduling application, using a commercially available expert system shell. PRESS is being developed on an IBM PC/AT using Teknowledge, Inc.'s M.1 expert system shell.
Tsai, Mitchell H; Huynh, Tinh T; Breidenstein, Max W; O'Donnell, Stephen E; Ehrenfeld, Jesse M; Urman, Richard D
2017-07-01
There has been little in the development or application of operating room (OR) management metrics to non-operating room anesthesia (NORA) sites. This is in contrast to the well-developed management framework for the OR management. We hypothesized that by adopting the concept of physician efficiency, we could determine the applicability of this clinical productivity benchmark for physicians providing services for NORA cases at a tertiary care center. We conducted a retrospective data analysis of NORA sites at an academic, rural hospital, including both adult and pediatric patients. Using the time stamps from WiseOR® (Palo Alto, CA), we calculated site utilization and physician efficiency for each day. We defined scheduling efficiency (SE) as the number of staffed anesthesiologists divided by the number of staffed sites and stratified the data into three categories (SE < 1, SE = 1, and SE >1). The mean physician efficiency was 0.293 (95% CI, [0.281, 0.305]), and the mean site utilization was 0.328 (95% CI, [0.314, 0.343]). When days were stratified by scheduling efficiency (SE < 1, =1, or >1), we found differences between physician efficiency and site utilization. On days where scheduling efficiency was less than 1, that is, there are more sites than physicians, mean physician efficiency (95% CI, [0.326, 0.402]) was higher than mean site utilization (95% CI, [0.250, 0.296]). We demonstrate that scheduling efficiency vis-à-vis physician efficiency as an OR management metric diverge when anesthesiologists travel between NORA sites. When the opportunity to scale operational efficiencies is limited, increasing scheduling efficiency by incorporating different NORA sites into a "block" allocation on any given day may be the only suitable tactical alternative.
Payload crew activity planning integration. Task 2: Inflight operations and training for payloads
NASA Technical Reports Server (NTRS)
Hitz, F. R.
1976-01-01
The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.
Space Shuttle External Tank Project status
NASA Technical Reports Server (NTRS)
Davis, R. M.
1980-01-01
The External Tank Project is reviewed with emphasis on the DDT&E and production phases and the lightweight tank development. It is noted that the DDT&E phase is progressing well with the structural and ground vibration test article programs complete, the propulsion test article program progressing well, and the component qualification and verification testing 92% complete. New tools and facilities are being brought on line to support the increased build rate for the production phase. The lightweight tank, which will provide additional payload in orbit, is progressing to schedule with first delivery in early 1982.
Development of the SSTL-300-S1 Composite Imager Barrel Structure
NASA Astrophysics Data System (ADS)
Hamar, Chris; Wood, Trevor; Alsami, Sami; Hallett, Ben
2014-06-01
The SSTL-300-S1 is the latest in the family of highly capable SSTL-300 platforms, providing high resolution imagery with all the existing mission performance of the heritage platform. In developing the product, SSTL has had to undertake the development of a composite imager barrel assembly, which forms the payload instrument's primary structure. Working to a nominal schedule of 24 months from requirements definition to structural qualification, the barrel's development philosophy has had to carefully balance the interdependent optical, structural and programmatic requirements. This paper provides a brief summary description of that development.
A study of interactive control scheduling and economic assessment for robotic systems
NASA Technical Reports Server (NTRS)
1982-01-01
A class of interactive control systems is derived by generalizing interactive manipulator control systems. Tasks of interactive control systems can be represented as a network of a finite set of actions which have specific operational characteristics and specific resource requirements, and which are of limited duration. This has enabled the decomposition of the overall control algorithm simultaneously and asynchronously. The performance benefits of sensor referenced and computer-aided control of manipulators in a complex environment is evaluated. The first phase of the CURV arm control system software development and the basic features of the control algorithms and their software implementation are presented. An optimal solution for a production scheduling problem that will be easy to implement in practical situations is investigated.
NASA Technical Reports Server (NTRS)
1974-01-01
The results of the updated 30-day life sciences dedicated laboratory scheduling and costing activities are documented, and the 'low cost' methodology used to establish individual equipment item costs is explained in terms of its allowances for equipment that is commerical off-the-shelf, modified commercial, and laboratory prototype; a method which significantly lowers program costs. The costs generated include estimates for non-recurring development, recurring production, and recurring operations costs. A cost for a biomedical emphasis laboratory and a Delta cost to provide a bioscience and technology laboratory were also generated. All cost reported are commensurate with the design and schedule definitions available.
NASA Technical Reports Server (NTRS)
Feir, J. B.
1974-01-01
Travel markets which would be served by high speed commercial transport aircraft and the ability of the airlines to schedule and route the aircraft in a way that would achieve good daily utilization and productivity are examined. The following areas are considered: (1) identification of the major long-haul city pairs that would most likely demand nonstop service; (2) selection of flight tracks observing alternative sonic boom restrictions; (3) estimation of flight times for all city pairs for the various sonic boom constraints; (4) impact of airport curfews on possible departure and arrival schedules; (5) projection of passenger traffic volumes on the selected city pairs; and (6) potential daily utilization and aircraft productivity.
Safety Discrete Event Models for Holonic Cyclic Manufacturing Systems
NASA Astrophysics Data System (ADS)
Ciufudean, Calin; Filote, Constantin
In this paper the expression “holonic cyclic manufacturing systems” refers to complex assembly/disassembly systems or fork/join systems, kanban systems, and in general, to any discrete event system that transforms raw material and/or components into products. Such a system is said to be cyclic if it provides the same sequence of products indefinitely. This paper considers the scheduling of holonic cyclic manufacturing systems and describes a new approach using Petri nets formalism. We propose an approach to frame the optimum schedule of holonic cyclic manufacturing systems in order to maximize the throughput while minimize the work in process. We also propose an algorithm to verify the optimum schedule.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-13
...The Bureau of Industry and Security (BIS) is seeking public comments on the impact of amending the Chemical Weapons Convention Regulations (CWCR) to reduce the concentration level at which the CWCR exempt certain mixtures containing Schedule 3 chemicals from the declaration requirements that apply to Schedule 3 chemical production and the reporting requirements that apply to exports and imports of Schedule 3 chemicals under the Chemical Weapons Convention (CWC). BIS is considering amending the CWCR declaration requirements that apply to the production of Schedule 3 chemicals to conform with the low concentration exemption adopted by the Organization for the Prohibition of Chemical Weapons (OPCW) in 2003, which applies when the concentration of any single Schedule 3 chemical in a mixture is ``30% or less,'' by weight or volume (whichever yields the lesser percent). Currently, the CWCR do not require the quantity of a Schedule 3 chemical contained in a mixture to be counted for declaration or reporting purposes if the concentration of the Schedule 3 chemical in the mixture is ``less than 80%'' by volume or weight (whichever yields the lesser percent). The current low concentration level was implemented in accordance with requirements set forth in the Chemical Weapons Convention Implementation Act (CWCIA). Accordingly, publication and implementation of regulatory changes affecting this low concentration exemption level would be contingent upon amendment of the CWCIA by the Congress. In addition, consistent with U.S. national discretion, BIS is considering amending the CWCR reporting requirements for exports and imports of Schedule 3 chemicals by reducing the low concentration exemption that applies to certain mixtures containing Schedule 3 chemicals from the current low concentration level of ``less than 80%'' of a Schedule 3 chemical by volume or weight (whichever yields the lesser percent) to a concentration of ``30% or less.''
A Decentralized Scheduling Policy for a Dynamically Reconfigurable Production System
NASA Astrophysics Data System (ADS)
Giordani, Stefano; Lujak, Marin; Martinelli, Francesco
In this paper, the static layout of a traditional multi-machine factory producing a set of distinct goods is integrated with a set of mobile production units - robots. The robots dynamically change their work position to increment the product rate of the different typologies of products in respect to the fluctuations of the demands and production costs during a given time horizon. Assuming that the planning time horizon is subdivided into a finite number of time periods, this particularly flexible layout requires the definition and the solution of a complex scheduling problem, involving for each period of the planning time horizon, the determination of the position of the robots, i.e., the assignment to the respective tasks in order to minimize production costs given the product demand rates during the planning time horizon.
Smart Energy Management of Multiple Full Cell Powered Applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
MOhammad S. Alam
2007-04-23
In this research project the University of South Alabama research team has been investigating smart energy management and control of multiple fuel cell power sources when subjected to varying demands of electrical and thermal loads together with demands of hydrogen production. This research has focused on finding the optimal schedule of the multiple fuel cell power plants in terms of electric, thermal and hydrogen energy. The optimal schedule is expected to yield the lowest operating cost. Our team is also investigating the possibility of generating hydrogen using photoelectrochemical (PEC) solar cells through finding materials for efficient light harvesting photoanodes. Themore » goal is to develop an efficient and cost effective PEC solar cell system for direct electrolysis of water. In addition, models for hydrogen production, purification, and storage will be developed. The results obtained and the data collected will be then used to develop a smart energy management algorithm whose function is to maximize energy conservation within a managed set of appliances, thereby lowering O/M costs of the Fuel Cell power plant (FCPP), and allowing more hydrogen generation opportunities. The Smart Energy Management and Control (SEMaC) software, developed earlier, controls electrical loads in an individual home to achieve load management objectives such that the total power consumption of a typical residential home remains below the available power generated from a fuel cell. In this project, the research team will leverage the SEMaC algorithm developed earlier to create a neighborhood level control system.« less
COSTMODL: An automated software development cost estimation tool
NASA Technical Reports Server (NTRS)
Roush, George B.
1991-01-01
The cost of developing computer software continues to consume an increasing portion of many organizations' total budgets, both in the public and private sector. As this trend develops, the capability to produce reliable estimates of the effort and schedule required to develop a candidate software product takes on increasing importance. The COSTMODL program was developed to provide an in-house capability to perform development cost estimates for NASA software projects. COSTMODL is an automated software development cost estimation tool which incorporates five cost estimation algorithms including the latest models for the Ada language and incrementally developed products. The principal characteristic which sets COSTMODL apart from other software cost estimation programs is its capacity to be completely customized to a particular environment. The estimation equations can be recalibrated to reflect the programmer productivity characteristics demonstrated by the user's organization, and the set of significant factors which effect software development costs can be customized to reflect any unique properties of the user's development environment. Careful use of a capability such as COSTMODL can significantly reduce the risk of cost overruns and failed projects.
One approach for evaluating the Distributed Computing Design System (DCDS)
NASA Technical Reports Server (NTRS)
Ellis, J. T.
1985-01-01
The Distributed Computer Design System (DCDS) provides an integrated environment to support the life cycle of developing real-time distributed computing systems. The primary focus of DCDS is to significantly increase system reliability and software development productivity, and to minimize schedule and cost risk. DCDS consists of integrated methodologies, languages, and tools to support the life cycle of developing distributed software and systems. Smooth and well-defined transistions from phase to phase, language to language, and tool to tool provide a unique and unified environment. An approach to evaluating DCDS highlights its benefits.
Production Scheduling of Sequenced Tapes for Printed Circuit Pack Assembly.
1987-07-09
detail. L j 6 The subject matter of this thesis is inspired directly from their technical report. The goals of this research are twofold: 1) Test their...The subject matter of the following chapters describes a heuristic approach to another variation of the sequenced tape production scheduling problem...assignment problem, comprise the subject matter of Chapter 5. It is sufficient to note that the three definitions of the term common correspond to the
Parts and Components Reliability Assessment: A Cost Effective Approach
NASA Technical Reports Server (NTRS)
Lee, Lydia
2009-01-01
System reliability assessment is a methodology which incorporates reliability analyses performed at parts and components level such as Reliability Prediction, Failure Modes and Effects Analysis (FMEA) and Fault Tree Analysis (FTA) to assess risks, perform design tradeoffs, and therefore, to ensure effective productivity and/or mission success. The system reliability is used to optimize the product design to accommodate today?s mandated budget, manpower, and schedule constraints. Stand ard based reliability assessment is an effective approach consisting of reliability predictions together with other reliability analyses for electronic, electrical, and electro-mechanical (EEE) complex parts and components of large systems based on failure rate estimates published by the United States (U.S.) military or commercial standards and handbooks. Many of these standards are globally accepted and recognized. The reliability assessment is especially useful during the initial stages when the system design is still in the development and hard failure data is not yet available or manufacturers are not contractually obliged by their customers to publish the reliability estimates/predictions for their parts and components. This paper presents a methodology to assess system reliability using parts and components reliability estimates to ensure effective productivity and/or mission success in an efficient manner, low cost, and tight schedule.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stone, D.M.; Huffmyer, W.A.; Greener, J.M.
This paper describes the geoscience and engineering aspects of the Opon Gas Field located in the Middle Magdalena Basin, Colombia. The remoteness and extreme downhole conditions make the drilling, completion, testing and geoscience interpretation of the two most recent Opon wells technically very challenging. Multiple faults, steep dips, rugged topography, a sensitive jungle environment and variable surface velocities complicate field definition. A full assessment of the commercial potential of the reservoir requires additional development drilling. Now in the early development stages, the Opon Gas Field has first production scheduled for late 1996.
Long range science scheduling for the Hubble Space Telescope
NASA Technical Reports Server (NTRS)
Miller, Glenn; Johnston, Mark
1991-01-01
Observations with NASA's Hubble Space Telescope (HST) are scheduled with the assistance of a long-range scheduling system (SPIKE) that was developed using artificial intelligence techniques. In earlier papers, the system architecture and the constraint representation and propagation mechanisms were described. The development of high-level automated scheduling tools, including tools based on constraint satisfaction techniques and neural networks is described. The performance of these tools in scheduling HST observations is discussed.
Competitive Nurse Rostering and Rerostering
2008-05-01
2003)(BenHassine and Ho, 2007), staff scheduling (Winstanley, 2004), project scheduling ( Knotts et. al. 2000)(Confessore et. al. 2007), and...International Journal of Production Research. Vol. 44, No. 20, 2006, 4431- 4444 32. Bowles, Cheryl and Candela, Lori. “First Job Experiences of Recents RN...IEEE Intl Sym on Comp Intel in Robotics and Automations. 2003, 312-317 105 81. Knotts , G. et. al. “Agent-Based Project Scheduling.” IIE
Achieving reutilization of scheduling software through abstraction and generalization
NASA Technical Reports Server (NTRS)
Wilkinson, George J.; Monteleone, Richard A.; Weinstein, Stuart M.; Mohler, Michael G.; Zoch, David R.; Tong, G. Michael
1995-01-01
Reutilization of software is a difficult goal to achieve particularly in complex environments that require advanced software systems. The Request-Oriented Scheduling Engine (ROSE) was developed to create a reusable scheduling system for the diverse scheduling needs of the National Aeronautics and Space Administration (NASA). ROSE is a data-driven scheduler that accepts inputs such as user activities, available resources, timing contraints, and user-defined events, and then produces a conflict-free schedule. To support reutilization, ROSE is designed to be flexible, extensible, and portable. With these design features, applying ROSE to a new scheduling application does not require changing the core scheduling engine, even if the new application requires significantly larger or smaller data sets, customized scheduling algorithms, or software portability. This paper includes a ROSE scheduling system description emphasizing its general-purpose features, reutilization techniques, and tasks for which ROSE reuse provided a low-risk solution with significant cost savings and reduced software development time.
The relationship of chronobiology to sleep schedules and performance demands
NASA Technical Reports Server (NTRS)
Monk, T. H.
1990-01-01
This review is concerned with how chronobiological results concerning the human circadian timekeeping system ( biological clock'), its response to changes in schedule, and its influence on performance ability can be used to improve shift worker wellbeing, safety and productivity.
Shift scheduling model considering workload and worker’s preference for security department
NASA Astrophysics Data System (ADS)
Herawati, A.; Yuniartha, D. R.; Purnama, I. L. I.; Dewi, LT
2018-04-01
Security department operates for 24 hours and applies shift scheduling to organize its workers as well as in hotel industry. This research has been conducted to develop shift scheduling model considering the workers physical workload using rating of perceived exertion (RPE) Borg’s Scale and workers’ preference to accommodate schedule flexibility. The mathematic model is developed in integer linear programming and results optimal solution for simple problem. Resulting shift schedule of the developed model has equally distribution shift allocation among workers to balance the physical workload and give flexibility for workers in working hours arrangement.
Hogiri, Tomoharu; Tamashima, Hiroshi; Nishizawa, Akitoshi; Okamoto, Masahiro
2018-02-01
To optimize monoclonal antibody (mAb) production in Chinese hamster ovary cell cultures, culture pH should be temporally controlled with high resolution. In this study, we propose a new pH-dependent dynamic model represented by simultaneous differential equations including a minimum of six system component, depending on pH value. All kinetic parameters in the dynamic model were estimated using an evolutionary numerical optimization (real-coded genetic algorithm) method based on experimental time-course data obtained at different pH values ranging from 6.6 to 7.2. We determined an optimal pH-shift schedule theoretically. We validated this optimal pH-shift schedule experimentally and mAb production increased by approximately 40% with this schedule. Throughout this study, it was suggested that the culture pH-shift optimization strategy using a pH-dependent dynamic model is suitable to optimize any pH-shift schedule for CHO cell lines used in mAb production projects. Copyright © 2017 The Society for Biotechnology, Japan. Published by Elsevier B.V. All rights reserved.
A half century of scalloping in the work habits of the United States Congress.
Critchfield, Thomas S; Haley, Rebecca; Sabo, Benjamin; Colbert, Jorie; Macropoulis, Georgette
2003-01-01
It has been suggested that the work environment of the United States Congress bears similarity to a fixed-interval reinforcement schedule. Consistent with this notion, Weisberg and Waldrop (1972) described a positively accelerating pattern in annual congressional bill production (selected years from 1947 to 1968) that is reminiscent of the scalloped response pattern often attributed to fixed-interval schedules, but their analysis is now dated and does not bear on the functional relations that might yield scalloping. The present study described annual congressional bill production over a period of 52 years and empirically evaluated predictions derived from four hypotheses about the mechanisms that underlie scalloping. Scalloping occurred reliably in every year. The data supported several predictions about congressional productivity based on fixed-interval schedule performance, but did not consistently support any of three alternative accounts. These findings argue for the external validity of schedule-controlled operant behavior as measured in the laboratory. The present analysis also illustrates a largely overlooked role for applied behavior analysis: that of shedding light on the functional properties of behavior in uncontrolled settings of considerable interest to the public. PMID:14768667
Estimating the cost of major ongoing cost plus hardware development programs
NASA Technical Reports Server (NTRS)
Bush, J. C.
1990-01-01
Approaches are developed for forecasting the cost of major hardware development programs while these programs are in the design and development C/D phase. Three approaches are developed: a schedule assessment technique for bottom-line summary cost estimation, a detailed cost estimation approach, and an intermediate cost element analysis procedure. The schedule assessment technique was developed using historical cost/schedule performance data.
An Exercise in Technology Prioritization in a Competitive Environment
NASA Technical Reports Server (NTRS)
Stephens, Karen L.
2006-01-01
The proper prioritization of technologies within a technology development program is critical for success in a budget constrained environment. A large portfolio of diverse products at differing states of development all competing for program resources presents a need for a process by which a realistic need date can guide the development strategy for each technology. This paper will document an exercise to identify "mission pull" for each technology that can be used to identify the best projected need date for each. This date is then used to back out a development schedule with corresponding funding profile needed to meet the flight opportunity.
Astronaut Office Scheduling System Software
NASA Technical Reports Server (NTRS)
Brown, Estevancio
2010-01-01
AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.
Process-based Cost Estimation for Ramjet/Scramjet Engines
NASA Technical Reports Server (NTRS)
Singh, Brijendra; Torres, Felix; Nesman, Miles; Reynolds, John
2003-01-01
Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.
Spike: Artificial intelligence scheduling for Hubble space telescope
NASA Technical Reports Server (NTRS)
Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert
1990-01-01
Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.
42 CFR 7.4 - Schedule of charges.
Code of Federal Regulations, 2012 CFR
2012-10-01
... REFERENCE BIOLOGICAL STANDARDS AND BIOLOGICAL PREPARATIONS § 7.4 Schedule of charges. The charges imposed in... ingredients. Charges may vary over time and between different biological standards or biological preparations... is available from the Biological Products Branch, Center for Infectious Diseases, Centers for Disease...
42 CFR 7.4 - Schedule of charges.
Code of Federal Regulations, 2010 CFR
2010-10-01
... REFERENCE BIOLOGICAL STANDARDS AND BIOLOGICAL PREPARATIONS § 7.4 Schedule of charges. The charges imposed in... ingredients. Charges may vary over time and between different biological standards or biological preparations... is available from the Biological Products Branch, Center for Infectious Diseases, Centers for Disease...
21 CFR 1314.15 - Loss reporting.
Code of Federal Regulations, 2013 CFR
2013-04-01
... Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE RETAIL SALE OF SCHEDULED LISTED CHEMICAL... located, any unusual or excessive loss or disappearance of a scheduled listed chemical product under the... supplier. (b) Each report submitted under paragraph (a) of this section must, whenever possible, be made...
21 CFR 1314.15 - Loss reporting.
Code of Federal Regulations, 2014 CFR
2014-04-01
... Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE RETAIL SALE OF SCHEDULED LISTED CHEMICAL... located, any unusual or excessive loss or disappearance of a scheduled listed chemical product under the... supplier. (b) Each report submitted under paragraph (a) of this section must, whenever possible, be made...
Scheduler Design Criteria: Requirements and Considerations
NASA Technical Reports Server (NTRS)
Lee, Hanbong
2016-01-01
This presentation covers fundamental requirements and considerations for developing schedulers in airport operations. We first introduce performance and functional requirements for airport surface schedulers. Among various optimization problems in airport operations, we focus on airport surface scheduling problem, including runway and taxiway operations. We then describe a basic methodology for airport surface scheduling such as node-link network model and scheduling algorithms previously developed. Next, we explain how to design a mathematical formulation in more details, which consists of objectives, decision variables, and constraints. Lastly, we review other considerations, including optimization tools, computational performance, and performance metrics for evaluation.
A scheduling algorithm for Spacelab telescope observations
NASA Technical Reports Server (NTRS)
Grone, B.
1982-01-01
An algorithm is developed for sequencing and scheduling of observations of stellar targets by equipment on Spacelab. The method is a general one. The scheduling problem is defined and examined. The method developed for its solution is documented. Suggestions for further development and implementation of this method are made.
Frutos, M; Méndez, M; Tohmé, F; Broz, D
2013-01-01
Many of the problems that arise in production systems can be handled with multiobjective techniques. One of those problems is that of scheduling operations subject to constraints on the availability of machines and buffer capacity. In this paper we analyze different Evolutionary multiobjective Algorithms (MOEAs) for this kind of problems. We consider an experimental framework in which we schedule production operations for four real world Job-Shop contexts using three algorithms, NSGAII, SPEA2, and IBEA. Using two performance indexes, Hypervolume and R2, we found that SPEA2 and IBEA are the most efficient for the tasks at hand. On the other hand IBEA seems to be a better choice of tool since it yields more solutions in the approximate Pareto frontier.
Automated Planning and Scheduling for Space Mission Operations
NASA Technical Reports Server (NTRS)
Chien, Steve; Jonsson, Ari; Knight, Russell
2005-01-01
Research Trends: a) Finite-capacity scheduling under more complex constraints and increased problem dimensionality (subcontracting, overtime, lot splitting, inventory, etc.) b) Integrated planning and scheduling. c) Mixed-initiative frameworks. d) Management of uncertainty (proactive and reactive). e) Autonomous agent architectures and distributed production management. e) Integration of machine learning capabilities. f) Wider scope of applications: 1) analysis of supplier/buyer protocols & tradeoffs; 2) integration of strategic & tactical decision-making; and 3) enterprise integration.
A Systems Engineering Approach for Global Fleet Station Alternatives in the Gulf of Guinea
2007-12-01
Understanding that many types of risk lie within categories such as cost, funding, management, political, production, and schedule , we may apply the... schedule , to the Gulf of Guinea beginning in October of 2007. USS FORT MCHENRY, an amphibious Landing Ship Dock (LSD), affords greater storage...Kerzner, Project Management: A Systems Approach to Planning, Scheduling , and Controlling (New Jersey: John Wiley & Sons, Inc., 2006), 724. 103 5
[Simultaneous determination of pesticide residues in agricultural products by LC-MS/MS].
Watanabe, Minae; Ueno, Eiji; Inoue, Tomomi; Ohno, Haruka; Ikai, Yoshitomo; Morishita, Toshio; Oshima, Harumi; Hayashi, Rumiko
2013-01-01
A method for the simultaneous determination of multiple pesticide residues in agricultural products was developed by liquid chromatography coupled with tandem mass spectrometry (LC-MS/MS). The sample was extracted with acetonitrile. Co-extractives were removed by GPC/graphitized carbon column SPE, and silica gel/PSA cartridge column SPE. Pesticides in the test solution were determined by LC-MS/MS using scheduled MRM. Recoveries of 124 pesticides from spinach, brown rice, soybean, orange and tomato were tested at the level of 0.1 µg/g, and those of 121 pesticides ranged from 70 to 120% (RSD≤15%). Pesticide residues in 239 agricultural products were investigated by this method, and residues of 49 pesticides were detected in 98 agricultural products.
Evaluation of a time efficient immunization strategy for anti-PAH antibody development
Li, Xin; Kaattari, Stephen L.; Vogelbein, Mary Ann; Unger, Michael A.
2016-01-01
The development of monoclonal antibodies (mAb) with affinity to small molecules can be a time-consuming process. To evaluate shortening the time for mAb production, we examined mouse antisera at different time points post-immunization to measure titer and to evaluate the affinity to the immunogen PBA (pyrene butyric acid). Fusions were also conducted temporally to evaluate antibody production success at various time periods. We produced anti-PBA antibodies 7 weeks post-immunization and selected for anti-PAH reactivity during the hybridoma screening process. Moreover, there were no obvious sensitivity differences relative to antibodies screened from a more traditional 18 week schedule. Our results demonstrate a more time efficient immunization strategy for anti-PAH antibody development that may be applied to other small molecules. PMID:27282486
Space shuttle maintenance program planning document
NASA Technical Reports Server (NTRS)
Brown, D. V.
1972-01-01
A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.
Automated Platform Management System Scheduling
NASA Technical Reports Server (NTRS)
Hull, Larry G.
1990-01-01
The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our work and results may be outdated when this paper is published.
Mission Planning and Scheduling System for NASA's Lunar Reconnaissance Mission
NASA Technical Reports Server (NTRS)
Garcia, Gonzalo; Barnoy, Assaf; Beech, Theresa; Saylor, Rick; Cosgrove, Jennifer Sager; Ritter, Sheila
2009-01-01
In the framework of NASA's return to the Moon efforts, the Lunar Reconnaissance Orbiter (LRO) is the first step. It is an unmanned mission to create a comprehensive atlas of the Moon's features and resources necessary to design and build a lunar outpost. LRO is scheduled for launch in April, 2009. LRO carries a payload comprised of six instruments and one technology demonstration. In addition to its scientific mission LRO will use new technologies, systems and flight operations concepts to reduce risk and increase productivity of future missions. As part of the effort to achieve robust and efficient operations, the LRO Mission Operations Team (MOT) will use its Mission Planning System (MPS) to manage the operational activities of the mission during the Lunar Orbit Insertion (LOI) and operational phases of the mission. The MPS, based on GMV's flexplan tool and developed for NASA with Honeywell Technology Solutions (prime contractor), will receive activity and slew maneuver requests from multiple science operations centers (SOC), as well as from the spacecraft engineers. flexplan will apply scheduling rules to all the requests received and will generate conflict free command schedules in the form of daily stored command loads for the orbiter and a set of daily pass scripts that help automate nominal real-time operations.
Planning for the semiconductor manufacturer of the future
NASA Technical Reports Server (NTRS)
Fargher, Hugh E.; Smith, Richard A.
1992-01-01
Texas Instruments (TI) is currently contracted by the Air Force Wright Laboratory and the Defense Advanced Research Projects Agency (DARPA) to develop the next generation flexible semiconductor wafer fabrication system called Microelectronics Manufacturing Science & Technology (MMST). Several revolutionary concepts are being pioneered on MMST, including the following: new single-wafer rapid thermal processes, in-situ sensors, cluster equipment, and advanced Computer Integrated Manufacturing (CIM) software. The objective of the project is to develop a manufacturing system capable of achieving an order of magnitude improvement in almost all aspects of wafer fabrication. TI was awarded the contract in Oct., 1988, and will complete development with a fabrication facility demonstration in April, 1993. An important part of MMST is development of the CIM environment responsible for coordinating all parts of the system. The CIM architecture being developed is based on a distributed object oriented framework made of several cooperating subsystems. The software subsystems include the following: process control for dynamic control of factory processes; modular processing system for controlling the processing equipment; generic equipment model which provides an interface between processing equipment and the rest of the factory; specification system which maintains factory documents and product specifications; simulator for modelling the factory for analysis purposes; scheduler for scheduling work on the factory floor; and the planner for planning and monitoring of orders within the factory. This paper first outlines the division of responsibility between the planner, scheduler, and simulator subsystems. It then describes the approach to incremental planning and the way in which uncertainty is modelled within the plan representation. Finally, current status and initial results are described.
21 CFR 113.100 - Processing and production records.
Code of Federal Regulations, 2010 CFR
2010-04-01
...-in or drained weight, or other critical factors specified in the scheduled process shall also be... container position; speed of the container conveyor chain; and, when the scheduled process specifies... of container. (6) Food preservation methods wherein critical factors such as water activity are used...
USDA-ARS?s Scientific Manuscript database
The capacity for evapotranspiration (ET)-based irrigation scheduling to reduce runoff volume and nutrient leaching was tested in Fall 2004 and Spring 2005. Runoff (container leachate plus unintercepted irrigation and precipitation) was collected continuously for 17 weeks during production of sweet ...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Schedules for the products and services is available in GSA's Schedules e-Library at Web site http://www... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false General. 538.7102 Section 538.7102 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION SPECIAL CATEGORIES OF...
21 CFR 1303.12 - Procurement quotas.
Code of Federal Regulations, 2010 CFR
2010-04-01
... and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE QUOTAS Aggregate Production and... substance, and, if a controlled substance listed in any schedule, the schedule number and Administration... Administration. See the Table of DEA Mailing Addresses in § 1321.01 of this chapter for the current mailing...
NASA Astrophysics Data System (ADS)
Chen, Jung-Chieh
This paper presents a low complexity algorithmic framework for finding a broadcasting schedule in a low-altitude satellite system, i. e., the satellite broadcast scheduling (SBS) problem, based on the recent modeling and computational methodology of factor graphs. Inspired by the huge success of the low density parity check (LDPC) codes in the field of error control coding, in this paper, we transform the SBS problem into an LDPC-like problem through a factor graph instead of using the conventional neural network approaches to solve the SBS problem. Based on a factor graph framework, the soft-information, describing the probability that each satellite will broadcast information to a terminal at a specific time slot, is exchanged among the local processing in the proposed framework via the sum-product algorithm to iteratively optimize the satellite broadcasting schedule. Numerical results show that the proposed approach not only can obtain optimal solution but also enjoys the low complexity suitable for integral-circuit implementation.
Three-dimensional user interfaces for scientific visualization
NASA Technical Reports Server (NTRS)
Vandam, Andries
1995-01-01
The main goal of this project is to develop novel and productive user interface techniques for creating and managing visualizations of computational fluid dynamics (CFD) datasets. We have implemented an application framework in which we can visualize computational fluid dynamics user interfaces. This UI technology allows users to interactively place visualization probes in a dataset and modify some of their parameters. We have also implemented a time-critical scheduling system which strives to maintain a constant frame-rate regardless of the number of visualization techniques. In the past year, we have published parts of this research at two conferences, the research annotation system at Visualization 1994, and the 3D user interface at UIST 1994. The real-time scheduling system has been submitted to SIGGRAPH 1995 conference. Copies of these documents are included with this report.
WFIRST: STScI Science Operations Center (SSOC) Activities and Plans
NASA Astrophysics Data System (ADS)
Gilbert, Karoline M.; STScI WFIRST Team
2018-01-01
The science operations for the WFIRST Mission will be distributed between Goddard Space Flight Center, the Space Telescope Science Institute (STScI), and the Infrared Processing and Analysis Center (IPAC). The STScI Science Operations Center (SSOC) will schedule and archive all WFIRST observations, will calibrate and produce pipeline-reduced data products for the Wide Field Instrument, and will support the astronomical community in planning WFI observations and analyzing WFI data. During the formulation phase, WFIRST team members at STScI have developed operations concepts for scheduling, data management, and the archive; have performed technical studies investigating the impact of WFIRST design choices on data quality and analysis; and have built simulation tools to aid the community in exploring WFIRST’s capabilities. We will highlight examples of each of these efforts.
Automated power management and control
NASA Technical Reports Server (NTRS)
Dolce, James L.
1991-01-01
A comprehensive automation design is being developed for Space Station Freedom's electric power system. A joint effort between NASA's Office of Aeronautics and Exploration Technology and NASA's Office of Space Station Freedom, it strives to increase station productivity by applying expert systems and conventional algorithms to automate power system operation. The initial station operation will use ground-based dispatches to perform the necessary command and control tasks. These tasks constitute planning and decision-making activities that strive to eliminate unplanned outages. We perceive an opportunity to help these dispatchers make fast and consistent on-line decisions by automating three key tasks: failure detection and diagnosis, resource scheduling, and security analysis. Expert systems will be used for the diagnostics and for the security analysis; conventional algorithms will be used for the resource scheduling.
First incremental buy for Increment 2 of the Space Transportation System (STS)
NASA Technical Reports Server (NTRS)
1989-01-01
Thiokol manufactured and delivered 9 flight motors to KSC on schedule. All test flights were successful. All spent SRMs were recovered. Design, development, manufacture, and delivery of required transportation, handling, and checkout equipment to MSFC and to KSC were completed on schedule. All items of data required by DPD 400 were prepared and delivered as directed. In the system requirements and analysis area, the point of departure from Buy 1 to the operational phase was developed in significant detail with a complete set of transition documentation available. The documentation prepared during the Buy 1 program was maintained and updated where required. The following flight support activities should be continued through other production programs: as-built materials usage tracking on all flight hardware; mass properties reporting for all flight hardware until sample size is large enough to verify that the weight limit requirements were met; ballistic predictions and postflight performance assessments for all production flights; and recovered SRM hardware inspection and anomaly identification. In the safety, reliability, and quality assurance area, activities accomplished were assurance oriented in nature and specifically formulated to prevent problems and hardware failures. The flight program to date has adequately demonstrated the success of this assurance approach. The attention focused on details of design, analysis, manufacture, and inspection to assure the production of high-quality hardware has resulted in the absence of flight failures. The few anomalies which did occur were evaluated, design or manufacturing changes incorporated, and corrective actions taken to preclude recurrence.
Teaching Risk Analysis in an Aircraft Gas Turbine Engine Design Capstone Course
2016-01-01
American Institute of Aeronautics and Astronautics 1 Teaching Risk Analysis in an Aircraft Gas Turbine Engine Design Capstone Course...development costs, engine production costs, and scheduling (Byerley A. R., 2013) as well as the linkage between turbine inlet temperature, blade cooling...analysis SE majors have studied and how this is linked to the specific issues they must face in aircraft gas turbine engine design. Aeronautical and
Paperless Procurement: The Impact of Advanced Automation
1992-09-01
System. POPS = Paperless Order Processing System; RADMIS = Research and Development Management Information System; SAACONS=Standard Army Automated... order processing system, which then updates the contractor’s production (or delivery) scheduling and contract accounting applications. In return, the...used by the DLA’s POPS. 3-5 into an EDI delivery order and pass it directly to the distributor’s or manufacturer’s order processing system. That
Applying Japanese management tips to patient accounts.
Groenevelt, C J
1990-04-01
"Just in time," a Japanese management philosophy that has been applied successfully in manufacturing operations, also can be used to improve management of patient accounts departments. Under its principles, healthcare organizations would develop standardized procedures; involve workers in decision making; set up training and education programs aimed at creating a multi-skilled pool of workers; establish smooth production schedules; and foster cooperation and commitment to the philosophy throughout the organization.
Design Insights for MapReduce from Diverse Production Workloads
2012-01-25
different industries [5]. Consequently, there is a need to develop systematic knowledge of MapRe- duce behavior at both established users within technol...relevant to MapReduce-like systems that combine data movements and computation. 5.2 Task granularity Many MapReduce workload management mechanisms make...ex- ecutes the jobs given, versus what the jobs actually are. MapReduce workload managers currently optimize exe- cution scheduling and placement
NAS Requirements Checklist for Job Queuing/Scheduling Software
NASA Technical Reports Server (NTRS)
Jones, James Patton
1996-01-01
The increasing reliability of parallel systems and clusters of computers has resulted in these systems becoming more attractive for true production workloads. Today, the primary obstacle to production use of clusters of computers is the lack of a functional and robust Job Management System for parallel applications. This document provides a checklist of NAS requirements for job queuing and scheduling in order to make most efficient use of parallel systems and clusters for parallel applications. Future requirements are also identified to assist software vendors with design planning.
tetrahydrocannabinol (delta-9-THC)] in Schedule II. Final rule.
2017-11-22
This final rule adopts without changes an interim final rule with request for comments published in the Federal Register on March 23, 2017. On July 1, 2016, the U.S. Food and Drug Administration (FDA) approved a new drug application for Syndros, a drug product consisting of dronabinol [(-)-delta-9-trans-tetrahydrocannabinol (delta-9-THC)] oral solution. The Drug Enforcement Administration (DEA) maintains FDA-approved products of oral solutions containing dronabinol in schedule II of the Controlled Substances Act.
The Large Area Crop Inventory Experiment /LACIE/ - A summary of three years' experience
NASA Technical Reports Server (NTRS)
Erb, R. B.; Moore, B. H.
1979-01-01
Aims, history and schedule of the Large Area Crop Inventory Experiment (LACIE) conducted by NASA, USDA and NOAA from 1974-1977 are described. The LACIE experiment designed to research, develop, apply and evaluate a technology to monitor wheat production in important regions throughout the world (U.S., Canada, USSR, Brasil) utilized quantitative multispectral data collected by Landsat in concert with current weather data and historical information. The experiment successfully exploited computer data and mathematical models to extract timely corp information. A follow-on activities for the early 1980's is planned focusing especially on the early warning of changes affecting production and quality of renewable resources and commodity production forecast.
Application of a Systems Engineering Approach to Support Space Reactor Development
NASA Astrophysics Data System (ADS)
Wold, Scott
2005-02-01
In 1992, approximately 25 Russian and 12 U.S. engineers and technicians were involved in the transport, assembly, inspection, and testing of over 90 tons of Russian equipment associated with the Thermionic System Evaluation Test (TSET) Facility. The entire Russian Baikal Test Stand, consisting of a 5.79 m tall vacuum chamber and related support equipment, was reassembled and tested at the TSET facility in less than four months. In November 1992, the first non-nuclear operational test of a complete thermionic power reactor system in the U.S. was accomplished three months ahead of schedule and under budget. A major factor in this accomplishment was the application of a disciplined top-down systems engineering approach and application of a spiral development model to achieve the desired objectives of the TOPAZ International Program (TIP). Systems Engineering is a structured discipline that helps programs and projects conceive, develop, integrate, test and deliver products and services that meet customer requirements within cost and schedule. This paper discusses the impact of Systems Engineering and a spiral development model on the success of the TOPAZ International Program and how the application of a similar approach could help ensure the success of future space reactor development projects.
Effective time management: surgery, research, service, travel, fitness, and family.
Porta, C Rees; Anderson, Michael R; Steele, Scott R
2013-12-01
Over 1,500 years ago, the St. Benedictine Monks used planning and strict schedules to increase their productivity. Since then, surgeons have developed several different strategies to manage our time effectively. Finding a balance among career, family, and hobbies is essential for maintaining satisfaction and optimizing productivity. Several recurring themes throughout the medical literature offer potential solutions to help maximize the little time surgeons possess. In this article, we will explore some of the methods and strategies available to help surgeons minimize waste and make the most of the most precious commodity we have-our time.
Effective Time Management: Surgery, Research, Service, Travel, Fitness, and Family
Porta, C. Rees; Anderson, Michael R.; Steele, Scott R.
2013-01-01
Over 1,500 years ago, the St. Benedictine Monks used planning and strict schedules to increase their productivity. Since then, surgeons have developed several different strategies to manage our time effectively. Finding a balance among career, family, and hobbies is essential for maintaining satisfaction and optimizing productivity. Several recurring themes throughout the medical literature offer potential solutions to help maximize the little time surgeons possess. In this article, we will explore some of the methods and strategies available to help surgeons minimize waste and make the most of the most precious commodity we have—our time. PMID:24436684
Effective organizational solutions for implementation of DBMS software packages
NASA Technical Reports Server (NTRS)
Jones, D.
1984-01-01
The space telescope management information system development effort is a guideline for discussing effective organizational solutions used in implementing DBMS software. Focus is on the importance of strategic planning. The value of constructing an information system architecture to conform to the organization's managerial needs, the need for a senior decision maker, dealing with shifting user requirements, and the establishment of a reliable working relationship with the DBMS vendor are examined. Requirements for a schedule to demonstrate progress against a defined timeline and the importance of continued monitoring for production software control, production data control, and software enhancements are also discussed.
Production of ELZM mirrors: performance coupled with attractive schedule, cost, and risk factors
NASA Astrophysics Data System (ADS)
Leys, Antoine; Hull, Tony; Westerhoff, Thomas
2016-08-01
Extreme light weighted ZERODUR Mirrors (ELZM) have been developed to exploit the superb thermal characteristics of ZERODUR. Coupled with up to date mechanical and optical fabrication methods this becomes an attractive technical approach. However the process of making mirror substrates has demonstrated to be unusually rapid and especially cost-effective. ELZM is aimed at the knee of the cost as a function of light weighting curve. ELZM mirrors are available at 88% light weighted. Together with their low risk, low cost production methods, this is presented as a strong option for NASA Explorer and Probe class missions.
NASA Technical Reports Server (NTRS)
Moore, J. E.
1975-01-01
An enumeration algorithm is presented for solving a scheduling problem similar to the single machine job shop problem with sequence dependent setup times. The scheduling problem differs from the job shop problem in two ways. First, its objective is to select an optimum subset of the available tasks to be performed during a fixed period of time. Secondly, each task scheduled is constrained to occur within its particular scheduling window. The algorithm is currently being used to develop typical observational timelines for a telescope that will be operated in earth orbit. Computational times associated with timeline development are presented.
Defense AT&L (Volume 35, Number 5, September-October 2006)
2006-10-01
percent of production. The criti- Defense AT&L: September-October 2006 8 cal path elements driving the IOT &E schedule are not pro- duction hardware...reduced costs, and successful completion of work in the scheduled time. 30 The Commodity Approach to Aircraft Protection Systems Capt. Bill Chubb, USN The...piece of Littoral Combat Ship Two during the ship’s keel laying ceremony. The Navy’s second Littoral Combat Ship is scheduled for commissioning in
Irrigation scheduling: When, where, and how much?
USDA-ARS?s Scientific Manuscript database
Irrigation scheduling, a key element of proper water management, is the accurate forecasting of water application (amount and timing) for optimal crop production (yield and fruit quality). The goal is to apply the correct amount of water at the right time to minimize irrigation costs and maximize cr...
30 CFR 33.12 - Changes after certification.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES... current recognition by a laboratory accrediting organization; (ii) Complete technical explanation of how... Subchapter D of this chapter (Bureau of Mines Schedule 2, revised, the current revision of which is Schedule...
30 CFR 33.12 - Changes after certification.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES... current recognition by a laboratory accrediting organization; (ii) Complete technical explanation of how... Subchapter D of this chapter (Bureau of Mines Schedule 2, revised, the current revision of which is Schedule...
The Associate Principal Astronomer for AI Management of Automatic Telescopes
NASA Technical Reports Server (NTRS)
Henry, Gregory W.
1998-01-01
This research program in scheduling and management of automatic telescopes had the following objectives: 1. To field test the 1993 Automatic Telescope Instruction Set (ATIS93) programming language, which was specifically developed to allow real-time control of an automatic telescope via an artificial intelligence scheduler running on a remote computer. 2. To develop and test the procedures for two-way communication between a telescope controller and remote scheduler via the Internet. 3. To test various concepts in Al scheduling being developed at NASA Ames Research Center on an automatic telescope operated by Tennessee State University at the Fairborn Observatory site in southern Arizona. and 4. To develop a prototype software package, dubbed the Associate Principal Astronomer, for the efficient scheduling and management of automatic telescopes.
Falk, J L; Siris, A; Lau, C E
1996-03-01
Groups of rats were given a chronic history of drinking cocaine solutions of different concentrations in daily, 3-h schedule induced polydipsia sessions. Animals failed to develop a preference for cocaine solution to concurrently presented water. Schedule-induction conditions were maintained, and the animals were divided into separate groups, drinking either cocaine or lidocaine placed in a highly acceptable vehicle (glucose-saccharin solution). Animals preferred their respective drug solutions to concurrently presented water, and these preferences remained stable after the glucose-saccharin vehicle was gradually faded to water, leaving only cocaine or lidocaine, respectively, in the solution. Thus a stable preference for drug solution to water could be instituted in rats for either cocaine or lidocaine solution (putative reinforcing and nonreinforcing agents, respectively) given an appropriate associative history, with high intakes maintained by schedule-induction. Conditions sufficient for the initiation of an oral preference and high intake for a putatively reinforcing drug cannot be assumed to occur owing to the drug's reinforcing property in the absence of demonstrating the ineffectiveness of an appropriate negative control substance.
NASA Astrophysics Data System (ADS)
Arons-Polan, Bonnie
This study examined the effect of three schedule types on student achievement in Advanced Placement Biology classes. AP Biology test scores from students on three types of full-year schedules were analyzed to assess the impact schedule type had on student achievement. The three schedules included the block and traditional schedules, and the rotating/hybrid, a blend of the former two schedules. The results indicated the variable most closely associated with success on the AP Biology exam was the length of experience the teachers had teaching the course, regardless of schedule type. Although significant differences were seen in mean AP Biology test scores among the three schedule types, this could be explained by the relationship between instructors' experience and schedule type. Regression analysis determined the two strongest predictors of successful performance on the AP Biology exam were instructors' experience and perceived teaching style, regardless of schedule type. It appears that the economically developed suburbs, had teachers with the largest amount of experience teaching AP Biology, and these teachers reported using a direct approach to teaching, using lecture greater than 50% of the time. The results of this study also suggest when restructuring to improve student achievement, educators should examine other variables in addition to the high school schedule. Restructuring the day to allow for longer classes must be accompanied by professional staff development to allow teachers to develop new teaching methods. Most of the teachers in the survey reported using lecture a great deal of the time, regardless of schedule type. Comments from the teachers from the various schedules revealed that the ability to add student centered, inquiry based activities and labs were dependent on adequate class time. No information on whether or not the teachers were given professional development to expand their repertoire of teaching methods when the school adopted a block or rotating hybrid schedule was obtained. Limitations to this study include the fact that there was no independent verification of teaching style as reported by the teachers in this study. This study involved only Advanced Placement Biology classes, so no generalizations can be made to other science classes.
Research requirements for development of regenerative engines for helicopters
DOE Office of Scientific and Technical Information (OSTI.GOV)
Semple, R.D.
1976-12-01
The improved specific fuel consumption of the regenerative engine was compared to a simple-cycle turboshaft engine. The performance improvement and fuel saving are obtained at the expense of increased engine weight, development and production costs, and maintenance costs. Costs and schedules are estimated for the elements of the research and development program. Interaction of the regenerative engine with other technology goals for an advanced civil helicopter is examined, including its impact on engine noise, hover and cruise performance, helicopter empty weight, drive-system efficiency and weight, one-engine-inoperative hover capability, and maintenance and reliability.
Research requirements for development of regenerative engines for helicopters
NASA Technical Reports Server (NTRS)
Semple, R. D.
1976-01-01
The improved specific fuel consumption of the regenerative engine was compared to a simple-cycle turboshaft engine. The performance improvement and fuel saving are obtained at the expense of increased engine weight, development and production costs, and maintenance costs. Costs and schedules are estimated for the elements of the research and development program. Interaction of the regenerative engine with other technology goals for an advanced civil helicopter is examined, including its impact on engine noise, hover and cruise performance, helicopter empty weight, drive-system efficiency and weight, one-engine-inoperative hover capability, and maintenance and reliability.
Zhang, Rui
2017-12-25
The traditional way of scheduling production processes often focuses on profit-driven goals (such as cycle time or material cost) while tending to overlook the negative impacts of manufacturing activities on the environment in the form of carbon emissions and other undesirable by-products. To bridge the gap, this paper investigates an environment-aware production scheduling problem that arises from a typical paint shop in the automobile manufacturing industry. In the studied problem, an objective function is defined to minimize the emission of chemical pollutants caused by the cleaning of painting devices which must be performed each time before a color change occurs. Meanwhile, minimization of due date violations in the downstream assembly shop is also considered because the two shops are interrelated and connected by a limited-capacity buffer. First, we have developed a mixed-integer programming formulation to describe this bi-objective optimization problem. Then, to solve problems of practical size, we have proposed a novel multi-objective particle swarm optimization (MOPSO) algorithm characterized by problem-specific improvement strategies. A branch-and-bound algorithm is designed for accurately assessing the most promising solutions. Finally, extensive computational experiments have shown that the proposed MOPSO is able to match the solution quality of an exact solver on small instances and outperform two state-of-the-art multi-objective optimizers in literature on large instances with up to 200 cars.
U.S. vaccine and immune globulin product shortages, 2001-15.
Ziesenitz, Victoria C; Mazer-Amirshahi, Maryann; Zocchi, Mark S; Fox, Erin R; May, Larissa S
2017-11-15
Trends in shortages of vaccines and immune globulin products from 2001 through 2015 in the United States are described. Drug shortage data from January 2001 through December 2015 were obtained from the University of Utah Drug Information Service. Shortage data for vaccines and immune globulins were analyzed, focusing on the type of product, reason for shortage, shortage duration, shortages requiring vaccine deferral, and whether the drug was a single-source product. Inclusion of the product into the pediatric vaccination schedule was also noted. Of the 2,080 reported drug shortages, 59 (2.8%) were for vaccines and immune globulin products. Of those, 2 shortages (3%) remained active at the end of the study period. The median shortage duration was 16.8 months. The most common products on shortage were viral vaccines (58%), especially hepatitis A, hepatitis B, rabies, and varicella vaccines (4 shortages each). A vaccine deferral was required for 21 shortages (36%), and single-source products were on shortage 30 times (51%). The most common reason for shortage was manufacturing problems (51%), followed by supply-and-demand issues (7%). Thirty shortages (51%) were for products on the pediatric schedule, with a median duration of 21.7 months. Drug shortages of vaccines and immune globulin products accounted for only 2.8% of reported drug shortages within a 15-year period, but about half of these shortages involved products on the pediatric vaccination schedule, which may have significant public health implications. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.
2013-06-27
CAPE CANAVERAL, Fla. – Inside the Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida, members of the media receive an on activities in NASA’s Ground Systems Development and Operations, or GSDO, Program, Space Launch System and Orion crew module for Exploration Test Flight 1. Speaking to the media, from left are Scott Wilson, manager of Orion Production Operations at Kennedy Larry Price, Lockheed Martin deputy program manager for Orion Tom Erdman, from Marshall Space Flight Center’s Kennedy resident office Jules Schneider, Lockheed Martin manager of Orion Production Operations and Jeremy Parsons, chief of the GSDO Operations Integration Office at Kennedy. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. Orion’s first unpiloted test flight is scheduled to launch in 2014 atop a Delta IV rocket. A second uncrewed flight test is scheduled for 2017 on NASA’s Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Jim Grossmann
Frutos, M.; Méndez, M.; Tohmé, F.; Broz, D.
2013-01-01
Many of the problems that arise in production systems can be handled with multiobjective techniques. One of those problems is that of scheduling operations subject to constraints on the availability of machines and buffer capacity. In this paper we analyze different Evolutionary multiobjective Algorithms (MOEAs) for this kind of problems. We consider an experimental framework in which we schedule production operations for four real world Job-Shop contexts using three algorithms, NSGAII, SPEA2, and IBEA. Using two performance indexes, Hypervolume and R2, we found that SPEA2 and IBEA are the most efficient for the tasks at hand. On the other hand IBEA seems to be a better choice of tool since it yields more solutions in the approximate Pareto frontier. PMID:24489502
Advances in mixed-integer programming methods for chemical production scheduling.
Velez, Sara; Maravelias, Christos T
2014-01-01
The goal of this paper is to critically review advances in the area of chemical production scheduling over the past three decades and then present two recently proposed solution methods that have led to dramatic computational enhancements. First, we present a general framework and problem classification and discuss modeling and solution methods with an emphasis on mixed-integer programming (MIP) techniques. Second, we present two solution methods: (a) a constraint propagation algorithm that allows us to compute parameters that are then used to tighten MIP scheduling models and (b) a reformulation that introduces new variables, thus leading to effective branching. We also present computational results and an example illustrating how these methods are implemented, as well as the resulting enhancements. We close with a discussion of open research challenges and future research directions.
Optimal de novo design of MRM experiments for rapid assay development in targeted proteomics.
Bertsch, Andreas; Jung, Stephan; Zerck, Alexandra; Pfeifer, Nico; Nahnsen, Sven; Henneges, Carsten; Nordheim, Alfred; Kohlbacher, Oliver
2010-05-07
Targeted proteomic approaches such as multiple reaction monitoring (MRM) overcome problems associated with classical shotgun mass spectrometry experiments. Developing MRM quantitation assays can be time consuming, because relevant peptide representatives of the proteins must be found and their retention time and the product ions must be determined. Given the transitions, hundreds to thousands of them can be scheduled into one experiment run. However, it is difficult to select which of the transitions should be included into a measurement. We present a novel algorithm that allows the construction of MRM assays from the sequence of the targeted proteins alone. This enables the rapid development of targeted MRM experiments without large libraries of transitions or peptide spectra. The approach relies on combinatorial optimization in combination with machine learning techniques to predict proteotypicity, retention time, and fragmentation of peptides. The resulting potential transitions are scheduled optimally by solving an integer linear program. We demonstrate that fully automated construction of MRM experiments from protein sequences alone is possible and over 80% coverage of the targeted proteins can be achieved without further optimization of the assay.
NASA Astrophysics Data System (ADS)
Adler, David S.; Workman, William M., III; Chance, Don
2004-09-01
The Science and Mission Scheduling Branch (SMSB) of the Space Telescope Science Institute (STScI) historically operated exclusively under VMS. Due to diminished support for VMS-based platforms at STScI, SMSB recently transitioned to Unix operations. No additional resources were available to the group; the project was SMSB's to design, develop, and implement. Early decisions included the choice of Python as the primary scripting language; adoption of Object-Oriented Design in the development of base utilities; and the development of a Python utility to interact directly with the Sybase database. The project was completed in January 2004 with the implementation of a GUI to generate the Command Loads that are uplinked to HST. The current tool suite consists of 31 utilities and 271 tools comprising over 60,000 lines of code. In this paper, we summarize the decision-making process used to determine the primary scripting language, database interface, and code management library. We also describe the finished product and summarize lessons learned along the way to completing the project.
Bi-Axial Solar Array Drive Mechanism: Design, Build and Environmental Testing
NASA Technical Reports Server (NTRS)
Scheidegger, Noemy; Ferris, Mark; Phillips, Nigel
2014-01-01
The development of the Bi-Axial Solar Array Drive Mechanism (BSADM) presented in this paper is a demonstration of SSTL's unique space manufacturing approach that enables performing rapid development cycles for cost-effective products that meet ever-challenging mission requirements: The BSADM is designed to orient a solar array wing towards the sun, using its first rotation axis to track the sun, and its second rotation axis to compensate for the satellite orbit and attitude changes needed for a successful payload operation. The tight development schedule, with manufacture of 7 Flight Models within 1.5 year after kick-off, is offset by the risk-reduction of using qualified key component-families from other proven SSTL mechanisms. This allowed focusing the BSADM design activities on the mechanism features that are unique to the BSADM, and having an Engineering Qualification Model (EQM) built 8 months after kick-off. The EQM is currently undergoing a full environmental qualification test campaign. This paper presents the BSADM design approach that enabled meeting such a challenging schedule, its design particularities, and the ongoing verification activities.
Quantifying and understanding reproductive allocation schedules in plants.
Wenk, Elizabeth Hedi; Falster, Daniel S
2015-12-01
A plant's reproductive allocation (RA) schedule describes the fraction of surplus energy allocated to reproduction as it increases in size. While theorists use RA schedules as the connection between life history and energy allocation, little is known about RA schedules in real vegetation. Here we review what is known about RA schedules for perennial plants using studies either directly quantifying RA or that collected data from which the shape of an RA schedule can be inferred. We also briefly review theoretical models describing factors by which variation in RA may arise. We identified 34 studies from which aspects of an RA schedule could be inferred. Within those, RA schedules varied considerably across species: some species abruptly shift all resources from growth to reproduction; most others gradually shift resources into reproduction, but under a variety of graded schedules. Available data indicate the maximum fraction of energy allocated to production ranges from 0.1 to 1 and that shorter lived species tend to have higher initial RA and increase their RA more quickly than do longer-lived species. Overall, our findings indicate, little data exist about RA schedules in perennial plants. Available data suggest a wide range of schedules across species. Collection of more data on RA schedules would enable a tighter integration between observation and a variety of models predicting optimal energy allocation, plant growth rates, and biogeochemical cycles.
Preliminary Evaluation of BIM-based Approaches for Schedule Delay Analysis
NASA Astrophysics Data System (ADS)
Chou, Hui-Yu; Yang, Jyh-Bin
2017-10-01
The problem of schedule delay commonly occurs in construction projects. The quality of delay analysis depends on the availability of schedule-related information and delay evidence. More information used in delay analysis usually produces more accurate and fair analytical results. How to use innovative techniques to improve the quality of schedule delay analysis results have received much attention recently. As Building Information Modeling (BIM) technique has been quickly developed, using BIM and 4D simulation techniques have been proposed and implemented. Obvious benefits have been achieved especially in identifying and solving construction consequence problems in advance of construction. This study preforms an intensive literature review to discuss the problems encountered in schedule delay analysis and the possibility of using BIM as a tool in developing a BIM-based approach for schedule delay analysis. This study believes that most of the identified problems can be dealt with by BIM technique. Research results could be a fundamental of developing new approaches for resolving schedule delay disputes.
Heuristic for Critical Machine Based a Lot Streaming for Two-Stage Hybrid Production Environment
NASA Astrophysics Data System (ADS)
Vivek, P.; Saravanan, R.; Chandrasekaran, M.; Pugazhenthi, R.
2017-03-01
Lot streaming in Hybrid flowshop [HFS] is encountered in many real world problems. This paper deals with a heuristic approach for Lot streaming based on critical machine consideration for a two stage Hybrid Flowshop. The first stage has two identical parallel machines and the second stage has only one machine. In the second stage machine is considered as a critical by valid reasons these kind of problems is known as NP hard. A mathematical model developed for the selected problem. The simulation modelling and analysis were carried out in Extend V6 software. The heuristic developed for obtaining optimal lot streaming schedule. The eleven cases of lot streaming were considered. The proposed heuristic was verified and validated by real time simulation experiments. All possible lot streaming strategies and possible sequence under each lot streaming strategy were simulated and examined. The heuristic consistently yielded optimal schedule consistently in all eleven cases. The identification procedure for select best lot streaming strategy was suggested.
Two-machine flow shop scheduling integrated with preventive maintenance planning
NASA Astrophysics Data System (ADS)
Wang, Shijin; Liu, Ming
2016-02-01
This paper investigates an integrated optimisation problem of production scheduling and preventive maintenance (PM) in a two-machine flow shop with time to failure of each machine subject to a Weibull probability distribution. The objective is to find the optimal job sequence and the optimal PM decisions before each job such that the expected makespan is minimised. To investigate the value of integrated scheduling solution, computational experiments on small-scale problems with different configurations are conducted with total enumeration method, and the results are compared with those of scheduling without maintenance but with machine degradation, and individual job scheduling combined with independent PM planning. Then, for large-scale problems, four genetic algorithm (GA) based heuristics are proposed. The numerical results with several large problem sizes and different configurations indicate the potential benefits of integrated scheduling solution and the results also show that proposed GA-based heuristics are efficient for the integrated problem.
Status of Mirror Technology for the Next Generation Space Telescope
NASA Astrophysics Data System (ADS)
Jacobson, D. N.
2000-10-01
The NGST primary mirror is anticipated to be a segmented deployable optic with segment size being in the range of 1-3m depending on the details of the architecture. Over the past 4 years the NGST program has initiated and implemented an aggressive lightweight cryogenic mirror technology program. The program was designed to challenge and excite the optical community in reaching a new standard in production of lightweight optics. The goal was to develop optics at < 15 kg/m2, operational at ~ 40K and meeting the overall NGST observatory requirement for diffraction limited performance at 2 microns. In order to meet the NGST needs, technology efforts were initiated to investigate and develop mirrors in a variety of materials, which held promise for the program. The basic technology approaches have initially targeted the production of large mirrors in the 1.2-2.0m diameter range (or side-to-side distance in the case of hexagonal optics). Although this size may not be the final size of an NGST primary mirror segment, it was felt that a 1.2-2.0m optic would be of sufficient size to understand the mirror material and fabrication processes which drive the cost and schedule of mirror production. The ultimate goals of the technology program are both to demonstrate mirrors meeting the NGST performance requirements, and to establish cost and schedule credibility for producing and implementing the mirrors for the NGST flight system. Establishing cost and schedule credibility is essential to NGST which is a cost capped mission, with past program experience demonstrating that the optics will be a large portion of the total cost of the program. The first two years of the program were dedicated to understanding the various applicable materials, funding those materials to various levels of maturity and implementing the first large mirror procurement, the NGST Mirror System Demonstrator (NMSD), in order to establish a benchmark for the state-of-the-art in lightweight optics and to establish credibility that the goals of NGST could be achieved. The past two years of the program has seen major steps in the development of several mirror materials, which not only might have NGST applicability but could also support other programs for other customers. Additionally, a second large mirror procurement, the Advanced Mirror System Demonstrator (AMSD), has been implemented providing a focal point to complete the mirror technology development and lead ultimately to the production of mirrors that will fly on NEXUS (NGST flight experimentand) and NGST. This talk will focus on a status of the mirror technology developed over the past 4 years on the NGST program.
Conflict-Aware Scheduling Algorithm
NASA Technical Reports Server (NTRS)
Wang, Yeou-Fang; Borden, Chester
2006-01-01
conflict-aware scheduling algorithm is being developed to help automate the allocation of NASA s Deep Space Network (DSN) antennas and equipment that are used to communicate with interplanetary scientific spacecraft. The current approach for scheduling DSN ground resources seeks to provide an equitable distribution of tracking services among the multiple scientific missions and is very labor intensive. Due to the large (and increasing) number of mission requests for DSN services, combined with technical and geometric constraints, the DSN is highly oversubscribed. To help automate the process, and reduce the DSN and spaceflight project labor effort required for initiating, maintaining, and negotiating schedules, a new scheduling algorithm is being developed. The scheduling algorithm generates a "conflict-aware" schedule, where all requests are scheduled based on a dynamic priority scheme. The conflict-aware scheduling algorithm allocates all requests for DSN tracking services while identifying and maintaining the conflicts to facilitate collaboration and negotiation between spaceflight missions. These contrast with traditional "conflict-free" scheduling algorithms that assign tracks that are not in conflict and mark the remainder as unscheduled. In the case where full schedule automation is desired (based on mission/event priorities, fairness, allocation rules, geometric constraints, and ground system capabilities/ constraints), a conflict-free schedule can easily be created from the conflict-aware schedule by removing lower priority items that are in conflict.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-15
... Implementation of the Chemical Weapons Convention on Commercial Activities Involving ``Schedule 1'' Chemicals, Including Production of Schedule 1 Chemicals as Intermediates, Through Calendar Year 2010 AGENCY: Bureau of... (BIS) is seeking public comments on the impact that implementation of the Chemical Weapons Convention...
30 CFR 33.38 - Electrical parts.
Code of Federal Regulations, 2011 CFR
2011-07-01
... MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements... Part 18 of Subchapter D of this chapter (Bureau of Mines Schedule 2, revised, the current revision of..., the current revision of which is Schedule 2F). (c) Units with electrical parts and designed for...
30 CFR 33.38 - Electrical parts.
Code of Federal Regulations, 2010 CFR
2010-07-01
... MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements... Part 18 of Subchapter D of this chapter (Bureau of Mines Schedule 2, revised, the current revision of..., the current revision of which is Schedule 2F). (c) Units with electrical parts and designed for...
75 FR 67054 - Listing of Approved Drug Products Containing Dronabinol in Schedule III
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-01
... dronabinol extracted from Cannabis sativa (i.e. naturally-derived), is identical to synthetically-produced... psychoactive component of the cannabis plant (marijuana). THC, as a general category, is listed in schedule I... capsule form containing natural dronabinol (derived from the cannabis plant) or synthetic dronabinol...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-09
... for the List I chemicals ephedrine, pseudoephedrine, and phenylpropanolamine, expressed in grams of anhydrous acid or base, as follows: Established 2014 Basic Class--Schedule I Quotas (grams) (1-Pentyl-1H... II Quotas (grams) 1-Phenylcyclohexylamine 3 1-Piperdinocyclohexanecarbonitrile (PCC) 3 4-Anilino-N...
78 FR 46615 - Records Schedules; Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-01
... process is available on request. Schedules Pending 1. Department of Defense, Defense Contract Management... officials. 2. Department of Defense, Defense Contract Management Agency (N1- 558-10-6, 6 items, 6 temporary... related to the production and maintenance of such records. 3. Department of Defense, Defense Logistics...
7 CFR 305.26 - Khapra beetle treatment schedule for feeds and milled products.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE PHYTOSANITARY TREATMENTS Heat... requirements. This treatment must be specifically authorized in each case by the Director of Plant Health... 7 Agriculture 5 2010-01-01 2010-01-01 false Khapra beetle treatment schedule for feeds and milled...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 21 Food and Drugs 9 2012-04-01 2012-04-01 false Scope. 1314.01 Section 1314.01 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE RETAIL SALE OF SCHEDULED LISTED CHEMICAL PRODUCTS General § 1314.01 Scope. This part specifies the requirements for retail sales of scheduled listed chemical...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Scope. 1314.01 Section 1314.01 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE RETAIL SALE OF SCHEDULED LISTED CHEMICAL PRODUCTS General § 1314.01 Scope. This part specifies the requirements for retail sales of scheduled listed chemical...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Scope. 1314.01 Section 1314.01 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE RETAIL SALE OF SCHEDULED LISTED CHEMICAL PRODUCTS General § 1314.01 Scope. This part specifies the requirements for retail sales of scheduled listed chemical...
Some Results of Weak Anticipative Concept Applied in Simulation Based Decision Support in Enterprise
NASA Astrophysics Data System (ADS)
Kljajić, Miroljub; Kofjač, Davorin; Kljajić Borštnar, Mirjana; Škraba, Andrej
2010-11-01
The simulation models are used as for decision support and learning in enterprises and in schools. Tree cases of successful applications demonstrate usefulness of weak anticipative information. Job shop scheduling production with makespan criterion presents a real case customized flexible furniture production optimization. The genetic algorithm for job shop scheduling optimization is presented. Simulation based inventory control for products with stochastic lead time and demand describes inventory optimization for products with stochastic lead time and demand. Dynamic programming and fuzzy control algorithms reduce the total cost without producing stock-outs in most cases. Values of decision making information based on simulation were discussed too. All two cases will be discussed from optimization, modeling and learning point of view.
The development of daily monitoring tool in a service part manufacturing company
NASA Astrophysics Data System (ADS)
Marpaung, Seamus Tadeo; Rosyidi, Cucuk Nur
2018-02-01
Production lead time is one of the key measures to assess whether a production system is running well or not. A short lead time will lead to higher customer satisfaction and will be a solid proof that a system is well-organized. To shorten the production lead time, a good production planning and control are required. There are many obstacles which can occur at any time, for instance shortage of material and worker, or poor production scheduling. Service Parts Planning Department works with many parties from the beginning of service parts production until it is delivered to the customer. This research was conducted to find an appropriate production monitoring tool for Service Parts Planning Department, which is a control method that make problems appears to the surface and can be overcome quickly so that the production process can run normally. The tool development started with a field study to find out the production flow from start to finish, a literature review and a interview with some employees who will later use the production control tool, and the creation of a daily control that went through several modifications until finally meet the needs of the department. In this research, a production monitoring tool which is developed can be used to monitor the entire order status, the production lead time, and also serves as the records and reports for presentation.
Scheduling: A guide for program managers
NASA Technical Reports Server (NTRS)
1994-01-01
The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.
AGT 100 automotive gas turbine system development
NASA Technical Reports Server (NTRS)
Helms, H. E. G.
1982-01-01
General Motors is developing an automotive gas turbine system that can be an alternate powerplant for future automobiles. Work sponsored by DOE and administered by NASA Lewis Research Center is emphasizing small component aerodynamics and high-temperature structural ceramics. Reliability requirements of the AGT 100 turbine system include chemical and structural ceramic component stability in the gas turbine environment. The power train system, its configuration and schedule are presented, and its performance tested. The aerodynamic component development is reviewed with discussions on the compressor, turbine, regenerator, interturbine duct and scroll, and combustor. Ceramic component development is also reviewed, and production cost and required capital investment are taken into consideration.