Sample records for program eeap fort

  1. Energy Engineering Analysis Program (EEAP), Limited Energy Study-Lighting Fort Campbell, Kentucky: Volume 1-Sections 1-5

    DTIC Science & Technology

    1994-09-23

    Buildings, and Blanchfield Hospital buildings B and C. The energy conservation opportunities (ECOs) evaluated were high efficiency interior and exterior lighting, and indoor lighting controls . Cost estimates were prepared.

  2. Energy savings opportunity survey. FY85 Energy Engineering Analysis Program. Various locations, Eighth US Army, Korea. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1987-03-01

    This study was prepared as part of the Engineering Energy Analysis Program (EEAP). The EEAP is a Department of Defense (DOD) program which was initiated in the late 1970`s in response to a Presidential Order. The program`s primary goal is to reduce energy consumption within the DOD thereby curbing dependence on foreign non-renewable energy sources, notably oil. The Energy Engineering Analysis Program (EEAP) is administrated by the U.S. Army Corps of Engineers through the Huntsville Division located in Huntsville, Alabama. The EEAP program effort in Korea has consisted of two major studies. The first study occured in 1981 and consistedmore » of basewide energy studies. The scope for these studies included looking at entire camps. The second effort under the EEAP program in Korea is this study. The scope of work for this study includes a total of 63 buildings located at 19 different camps throughout Korea from Taegu to the DMZ (see Figure 1). This study is properly known as an Energy Savings Opportunity Survey (ESOS). Since an ESOS is limited to examining individual buildings, energy savings projects are limited to the scale and complexity of the buildings within the study.« less

  3. Limited Energy Study, EEAP - DACA01-94-D-0037, for Fort Monmouth. Book 1.

    DTIC Science & Technology

    1997-03-01

    Engineers, and Mr. Kevin Dooney and Mr. William Van Sant, Ft. Monmouth represented the government. Entech Engineering, Inc. 2-1 The purpose of the meeting...eas Plant Chilled Waer § Ssdegrees F 05 04 148 AHU- -5 AHU-MC4ilrane 0.0 (MR-35_South 3 0/400 Area) .30/0400 ottices/corodors Plant Chilled Water...441-7403 REPRESENTING: Norfolk District PHONE CODE: 036 SUBJECT: Scope of Study NOTES: Discussed Kevin Dooney’s request that Entech not focus totally

  4. Anti-inflammatory effects of the roots of Alpinia pricei Hayata and its phenolic compounds.

    PubMed

    Yu, Yu-Shan; Hsu, Chin-Lin; Yen, Gow-Chin

    2009-09-09

    Alpinia pricei Hayata is cultivated throughout Asia and is an endemic plant in Taiwan. The leaf and root of this plant are used for traditional wrapping of food and as a cooking substitute for fresh ginger. The aim of this work was to study the in vitro anti-inflammatory effects of ethanol extracts from A. pricei Hayata (EEAP) and its phenolic compounds. High-performance liquid chromatography (HPLC) profiling indicated that EEAP contained caffeic acid, chlorogenic acid, ferulic acid, p-hydroxybenzoic acid, rutin, apigenin, curcumin and pinocembrin. EEAP and its phenolic compounds, apigenin, curcumin, and pinocembrin, inhibited lipopolysaccharide (LPS)-stimulated nitric oxide (NO) and prostaglandin E(2) (PGE(2)) production in RAW 264.7 cells. Furthermore, EEAP, apigenin, curcumin, and pinocembrin decreased LPS-mediated induction of protein and mRNA expression of inducible nitric oxide synthase (iNOS) and cyclooxygenase-2 (COX-2) in RAW 264.7 cells. In addition, EEAP and its major active compound pinocembrin inhibited LPS-induced nuclear translocation of nuclear factor-kappaB (NF-kappaB) and NF-kappaB-mediated reporter gene expression. EEAP and pinocembrin also significantly inhibited LPS-induced intracellular reactive oxygen species (ROS) production in RAW 264.7 cells. When these results are taken together, they indicate that EEAP and pinocembrin suppressed LPS-induced NO and PGE(2) production by inhibition of NF-kappaB nuclear translocation and ROS generation.

  5. Energy Engineering Analysis Program, energy survey of Army Industrial Facilities, Western Area Demilitarization Facility, Hawthorne Army Ammunition Plant, Hawthorne, Nevada; Volume 1 - energy report. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-03-17

    This report summarizes all work for the Energy Survey of Army Industrial Facilities, Energy Engineering Analysis Program (EEAP) at the Western Area Demilitarization Facility (WADF) of the Hawthorne Army Ammunition Plant (HWAAP), Hawthorne, Nevada, authorized under Contract No. DACA05-92-C-0155 with the U.S. Army Corps of Engineers, Sacramento District, California. The purpose of this energy survey is to develop a set of projects and actions that will reduce energy consumption and operating costs of selected facilities at the WADF. A preliminary inspection of facilities at WADF by Keller Gannon that identified potential retrofit opportunities was submitted as the EEAP Study andmore » Criteria Review in December 1993. This document formed the basis of the Detailed Scope of Work for this study. Facilities included in the survey and study, together with operational status.« less

  6. Energy Engineering Analysis Program, energy survey of Army Industrial Facilities, Western Area Demilitarization Facility Hawthorne Ermy Ammunition Plant Hawthorne, Nevada. Volume 1. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-03-17

    This report summarizes all work for the Energy Survey of Army Industrial Facilities, Energy Engineering Analysis Program (EEAP) at the Western Area Demilitarization Facility (WADF) of the Hawthorne Army Ammunition Plant (HWAAP), Hawthorne, Nevada, authorized under Contract No. DACA03-92-C-0155 with the U.S. Army Corps of Engineers, Sacramento District, California. The purpose of this energy survey is to develop a set of projects and actions that will reduce energy consumption and operating costs of selected facilities at the WADF. A preliminary inspection of facilities at WADF by Keller Gannon that identified potential retrofit opportunities was submitted as the EEAP Study andmore » Criteria Review in December 1993. This document formed the basis of the Detailed Scope of Work for this study. Facilities included in the survey and study, together with operational status, are listed in Table 1 - 1. The complete scope of work appears in Appendix.« less

  7. Eeap-lighting survey study at the Red River Army Depot Texarkana, Texas. Final report, 17 October 1994-14 April 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pieper, C.A.; Luckett, T.

    This energy conservation study was performed by Huitt-Zollars Inc, for the U.S. Army Engineer District (USAED), Fort Worth, under contract number DACAC63-94-D-00l5. The study was conducted at Red River Army Depot (RRAD) in Texarkana, Texas, between October 17, 1994 and April 14, 1995. The site survey and data collection were performed by C.A. Pieper, P.E. and Tom Luckett, Lighting Designer. The purpose of the study was to perform a limited site survey of specific buildings at the facility, identify Conservation Opportunities (ECOs) that exist, and then evaluate these ECOs for technical and economic feasibility. These ECOs were limited to buildingmore » interior lighting and it`s effects on the heating, ventilating and air conditioning (HVAC) systems.« less

  8. Environmental effects of ozone depletion, UV radiation and interactions with climate change: UNEP Environmental Effects Assessment Panel, update 2017

    EPA Science Inventory

    The Environmental Effects Assessment Panel (EEAP) is one of three Panels of experts that inform the Parties to the Montreal Protocol. The EEAP focuses on the effects of UV radiation on human health, terrestrial and aquatic ecosystems, air quality, and materials, as well as on the...

  9. Chilled water study EEAP program for Walter Reed Army Medical Center. Book 1. Final Submission

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    The Energy Engineering Analysis Program (EEAP) Study for Walter Reed Army Medical Center (WRAMC) was to provide a thorough examination of the central chilled water plants on site. WRAMC is comprised of seventy-one (71) buildings located on a 113-acre site in Washington, D.C. There are two (2) central chilled water plants (Buildings 48 and 49) each with a primary chilled water distribution system. In addition to the two (2) central plants, three (3) buildings utilize their own independent chillers. Two (2) of the independent chillers (Buildings 7 and T-2), one of which is inoperative (T-2), are smaller air-cooled units, whilemore » the third (Building 54) has a 1,900-ton chilled water plant comprised of three (3) centrifugal chillers. Of the two (2) central chilled water plants, Building 48 houses six (6) chillers totalling 7,080 tons of cooling and Building 49 houses one (1) chiller with 660 tons of cooling. The total chiller cooling capacity available on site is 9,840 tons.« less

  10. Environmental effects of ozone depletion and its interactions with climate change: progress report, 2015.

    PubMed

    2016-02-01

    The Environmental Effects Assessment Panel (EEAP) is one of three Panels that regularly informs the Parties (countries) to the Montreal Protocol on the effects of ozone depletion and the consequences of climate change interactions with respect to human health, animals, plants, biogeochemistry, air quality, and materials. The Panels provide a detailed assessment report every four years. The most recent 2014 Quadrennial Assessment by the EEAP was published as a special issue of seven papers in 2015 (Photochem. Photobiol. Sci., 2015, 14, 1-184). The next Quadrennial Assessment will be published in 2018/2019. In the interim, the EEAP generally produces an annual update or progress report of the relevant scientific findings. The present progress report for 2015 assesses some of the highlights and new insights with regard to the interactive nature of the effects of UV radiation, atmospheric processes, and climate change.

  11. Energy Engineering Analysis Program (EEAP), Badger Army Ammunition Plant, Baraboo, Wisconsin: Executive summary. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1983-12-30

    The purpose of this study and report is to develop a systematic program of energy consumption reductions in compliance with the stated goals of the Army Facilities Energy Plan (AFEP). This report will: Develop a systematic plan of energy conservation opportunities (ECO`s) that will meet the objectives of the AFEP. Develop a coordinated facility-wide energy study. Prepare DD Form 1391 and Project Development Brochure (PDB`s) and required documentation for feasible projects. Include all practical energy conservation methods and determine economic feasibility in accordance with given guidelines. List and prioritize recommended projects.

  12. Environmental effects of ozone depletion and its interactions ...

    EPA Pesticide Factsheets

    When considering the effects of climate change, it has become clear that processes resulting in changes in stratospheric ozone are more complex than previously believed. As a result of this, human health and environmental issues will be longer-lasting and more regionally variable. Like the other Panels, the EEAP produces a detailed report every four years; the most recent was published as a series of seven papers in 2015 (Photochem. Photobiol. Sci., 2015, 14, 1-184). In the years in between, the EEAP produces less detailed and shorter Progress Reports of the relevant scientific findings. The most recent of these was for 2015 (Photochem. Photobiol. Sci., 2016, 15, 141-147). The present Progress Report for 2016 assesses some of the highlights and new insights with regard to the interactive nature of the direct and indirect effects of UV radiation, atmospheric processes, and climate change. The report is also published in (Photochem. Photobiol. Sci., 2017, DOI: 10.1039/c7pp90001e). The more detailed Quadrennial Assessment will be made available in 2018. The Parties to the Montreal Protocol are informed by three Panels of experts. One of these is the Environmental Effects Assessment Panel (EEAP), which deals with two focal issues. The first focus is the effects on increased UV radiation on human health, animals, plants, biogeochemistry, air quality, and materials. The second focus is on interactions between UV radiation and global climate change and how these may

  13. Chilled water study EEAP program for Walter Reed Army Medical Center: Book 2. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    The Energy Engineering Analysis Program (EEAP) Study for Walter Reed Army Medical Center (WRAMC) was to provide a thorough examination of the central chilled water plants on site. WRAMC is comprised of seventy-one (71) buildings located on a 113-acre site in Washington, D.C. There are two (2) central chilled water plants (Buildings 48 and 49) each with a primary chilled water distribution system. In addition to the two (2) central plants, three (3) buildings utilize their own independent chillers. Two (2) of the independent chillers (Buildings 7 and T-2), one of which is inoperative (T-2), are smaller air-cooled units, whilemore » the third (Building 54) has a 1,900-ton chilled water plant comprised of three (3) centrifugal chillers. Of the two (2) central chilled water plants, Building 48 houses six (6) chillers totalling 7,080 tons of cooling and Building 49 houses one (1) chiller with 660 tons of cooling. The total chiller cooling capacity available on site is 9,840 tons. The chilled water systems were reviewed for alternative ways of conserving energy on site and reducing the peak-cooling load. Distribution systems were reviewed to determine which buildings were served by each of the chilled water plants and to determine chilled water usage on site. Evaluations were made of building exterior and interior composition in order to estimate cooling loads. Interviews with site personnel helped Entech better understand the chilled water plants, the distribution systems, and how each system was utilized.« less

  14. Energy savings opportunity survey at Walter Reed Army Medical Center, Washington, DC. Final Submittal report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1987-10-22

    This Energy Savings Opportunity Survey (ESOS) was performed for sixteen (16) buildings at Walter Reed Army Medical Center (WPAMC) in Washington, D.C. This survey was intended to reevaluate and update projects from a previous Energy Engineering Analysis Program (EEAP) survey performed at WRAMC. However, the previous EEAP survey was determined by the contracting officer to be incomplete and not worthy of further consideration. Therefore, this survey involved the complete reevaluation of the buildings to determine their potential energy cost savings. Six (6) projects and nine (9) low cost/no cost energy conservation opportunities (ECO`s) are recommended for implementation in the buildings.more » These projects and ECO`s are projected to annually save $448,263 at an implementation cost of $891,659. The simple payback (i.e., implementation cost divided by cost savings) for the recommendations in the survey is 1.99 years. The two (2) projects with the greatest cost savings are a stack heat recovery system (Project Number 5) and HVAC modifications (Project Number 1). These two (2) projects will provide 67% of the projected total savings for the survey. The sixteen (16) buildings in this survey represent only 22% of the total floor area of the Walter Reed Army Medical Center complex. It is believed that significant potential energy cost savings amounting to two (2) million dollars may be achieved in the remaining buildings in the complex not included in this survey. Specifically it is believed the main hospital building contains many opportunities for substantial cost savings.« less

  15. Base Realignment and Closure Environmental Evaluation (BRAC EE) Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-09-01

    Not Sampled ......... 6 2.3.2 Transformer Sites Sampled ........................ 7 2.4 Soil Sampling Protocol and Analytical Program ...Evaluation (AREE) 66. The study included evaluating the current PCB Transformer Management Program administered by the Fort Devens Environmental Management...Office (EMO), the Fort Devens Spill Contingency Plan, and the ongoing transformer inspection program . Personnel in both the Fort Devens EMO and the Fort

  16. Environmental effects of ozone depletion and its interactions with climate change: progress report, 2015

    EPA Science Inventory

    The Environmental Effects Assessment Panel (EEAP) is one of three Panels that regularly informs the Parties (countries) to the Montreal Protocol on the effects of ozone depletion and the consequences of climate change interactions with respect to human health, animals, plants, bi...

  17. Enhanced Preliminary Assessment Fort Devens, Massachusetts

    DTIC Science & Technology

    1992-04-30

    remedial programs and RCRA corrective actions at Fort Devens . The areas regulated under RCRA will require closure when no longer in...under which the work in the MEP has been developed requires full integration of CERCLA remedial programs and RCRA corrective actions at Fort Devens ...AREEs 65 and 67, asbestos and radon, respectively. Fort Devens has ongoing programs that deal with these concerns. Any remedial action or disturbance

  18. PHOTOCOPY OF DRAWING (from Cultural Resources Management Program for the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PHOTOCOPY OF DRAWING (from Cultural Resources Management Program for the Environment Management Division, Directorate of Public Works, Fort Benning, Georgia) Delineator unknown. GARAGES - Fort Benning, Building No. 864, 7325 Miller Loop, Main Post, Fort Benning Military Reservation, Chattahoochee County, GA

  19. 77 FR 69598 - Procurement List Proposed Addition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-20

    ... Support, Directorate of Public Works, Fort Lee, Virginia. NPA: Skookum Educational Programs, Bremerton, WA Contracting Activity: Mission and Installation Contracting Command-- Fort Lee, Fort Lee, VA Barry S. Lineback...

  20. Data Mining the Corporate Dental System of USA DENTAC Fort Bragg

    DTIC Science & Technology

    2016-06-10

    Data Mining the Corporate Dental System of USA DENTAC Fort Bragg FREDWIN HOLOMON, D.D.S. B.S. University of...AEGD Program Director ABSTRACT Statement of the problem: Dental wellness has not reached optimum levels at Fort Bragg after implementation of...the Go First Class Program. Purpose: To examine the Go First Class Program’s influence upon dental wellness and readiness. Materials and Methods

  1. Reserve Component Programs, Fiscal Year 1991

    DTIC Science & Technology

    1992-02-28

    Medical at Fort United States, and European Command Devens , Massachusetts, conducted its initial Casualty Receiving Hospitals, as well as, new...Berkman United States Army Militar% Lxcutic, Rcscrsc Fortes Polity Board Chief, AriN Rescrse. 19𔄃-1980 Attorney-at-Law, Morrison & Foerster San...the Selected Reserve componeit personnel categories. Reserve Component Programs FY 1991 Refere Fortes Polt) Board 3 Table 1-2 COMPOSITION OF THE READY

  2. Bois Forte Indoor Air Quality Program

    EPA Pesticide Factsheets

    The Bois Forte Indoor Air Quality Program acted swiftly and aggressively to tackle mold and moisture problems in its community members’ homes after several residents became ill as a result of environmental exposures.

  3. Communication Effectiveness of the Army Civilian Personnel Program

    DTIC Science & Technology

    1966-06-01

    Fort Devens Eastern CONARC/Troops 1880 Fort Lee Southern CONARC/School 2500 Fort MacArthur Western CONARC/Troops 1060 Fort Sam Houston Southern...A- t- I ta1 it ciu.1 rac t v’I I at I vi ii o I tih cim t c lt i oisit Itil Ih cm we𔃻:.’ tin t i f It i ,:i1 v .1 Nil I ii’j’or e’i I ACK NOWI I. M...Southern AMC/Supply 3000 Fort Benjamin Harrison Midwestern Audit/Finance 6000 Fort Benning Southern CONARC/Troops 3300 Fort Carson Western

  4. EEAP lighting survey study at the Red River Army Depot, Texarkana, Texas. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The purpose of the study was to perform a limited site survey of specific buildings at the facility, identify specific Energy Conservation Opportunities (ECOs) that exist, and then evaluate these ECOs for technical and economic feasibility. These ECOs were limited to building interior lighting and it`s effects on the heating, ventilating and air conditioning (HVAC) systems. This survey was conducted with the assistance of many individuals at the facility.

  5. EEAP boiler and chiller study II at Fort Sam Houston, San Antonio, Texas. Volume II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The following assumptions and estimates were used in the modeling of the existing buildings which are served by the boilers and chillers included in this study. (1) The Trace 600 weather data for San Antonio, Texas was used in all of the computer simulations. (2) The Trace 600 computer simulations were performed for the months of January through December to determine annual HVAC equipment energy consumptions. (3) A special holiday schedule was created to incorporate the additional holidays that military personnel living in the area 1300 barracks buildings receive. This schedule includes the seven standard holidays plus the period frommore » December 17 through 31. The standard seven day holiday schedule was used for all other areas. (4) All building dimensions and construction data were determined from as-built drawings when available, or from field measurements taken during the site visit. (5) Design room temperatures for comfort conditions (thermostat setpoints) were obtained from CEMP-E (9 December 1991) Chapter 13, Section 3. These temperatures were 78 deg F, 50% relative humidity for cooling and 70 deg F for heating. No cooling or heating temperature setback control was included in the simulations. The design room conditions for the hospital were determined as follows: Surgery / Critical Care 68 deg F, 55%; Ancillary 72 deg F, 50%; Nursing / Patient Care 76 deg F, 50%; and Computer Room 72 deg F, 50%. (6) The shading coefficient for all windows with interior shading devices was estimated at 0.67 per ASHRAE data. (7) The number of people in each building or room was estimated from interviews with post personnel or field notes taken during the site visit. The sensible and latent heat gain rates used for the people in each room were taken from ASHRAE data.« less

  6. The Automated Programming of Electronic Displays.

    DTIC Science & Technology

    1986-09-01

    A182 931 THE AUTOMATED PROGRAMMING OF ELECTRONIC DISPLAYSCU) 11 SOFTWARE CONSULTING SPECIALIST INC FORT MAYNE IN R W HASKER ET AL SEP 86 AFURL-TR-86...M. R. Fritsch Software Consulting Specialists , Inc. ( P. 0. Box 15367 O Fort Wayne, IN 46885 00 V September 1986 S Final Report for Period July 1985...N 05 111 0 PRO~l S AGRAM CL(CWfT.P^OJ(CV. TASK Software Consulting Specialists , Inc. ;Ms CA 01 Wol WUNSCAS P. 0. Box 15367 62201F Fort Wayne, IN

  7. The Fort Logan Lodge: Intentional Community for Chronic Mental Patients. Final Report.

    ERIC Educational Resources Information Center

    Fort Logan Mental Health Center, Denver, CO.

    This report attempts to identify important variables affecting the success of the Lodge Program, affiliated with the Fort Logan Mental Health Center. The Lodge Program is a community based, group oriented, social and work program for the rehabilitation of the refractory, long stay mental patient. Findings reported include the following: (1) the…

  8. Fort Berthold Library Literacy Program. Final Performance Report, October 1, 1988-September 30, 1989.

    ERIC Educational Resources Information Center

    Fort Berthold Reservation Public Library, New Town, ND.

    The report describes activities of the Fort Berthold Reservation Public Library (North Dakota) Literacy Program to meet six objectives for the 1988-89 project year. The program was designed specifically to promote literacy among three Native American tribes, the Mandan, Hidatsa, and Arikara. Objectives included acquisition of a library literacy…

  9. 75 FR 48411 - Noise Compatibility Program Notice; Fort Worth Alliance Airport, Fort Worth, TX

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Noise Compatibility Program Notice.... SUMMARY: The Federal Aviation Administration (FAA) announces that it is reviewing a proposed noise... et seq. (the Aviation Safety and Noise Abatement Act, hereinafter referred to as ``the Act'') and 14...

  10. 75 FR 78799 - Noise Compatibility Program Notice, Fort Worth Alliance Airport, Fort Worth, TX

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-16

    ... military operations proposed by the Department of Defense. This revision delayed acceptance of the future... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Noise Compatibility Program Notice... Report No. 96-52 (1980). On September 7, 2006, the FAA determined that the noise exposure maps submitted...

  11. Program Management for Tank Crewman Skills Training Program.

    DTIC Science & Technology

    1979-11-01

    RESEARCH PRODUCT 79-16 PROGRAM MANAGEMENT FOR TANK CREWMAN SKILLS TRAINING PROGRAM ARI Field Unit at Fort Knox, Kentucky f hadocumr-e r- has~ bean a4...40121, and monitored by Donald F . Haggard, Chief, ARI Field I - -Unit-Fort Knox. It. KEY WORDS (Continue on reverse side If necessary end identify by...TRAINING PROGRAM Richard E. O’Brien William J. Crum Human Resources Research Organization (HumRRO) Submitted by-. Donald F . Haggard, Chief ARI Field

  12. Administrative Procedures for the Fort Lincoln Schools. Fort Lincoln New Town Education System.

    ERIC Educational Resources Information Center

    General Learning Corp., Washington, DC.

    This is an operating manual for administration of the educational program to be used by the staff of the Fort Lincoln First Facility. It details specifications regarding information flow, storage, output, time cycles, staffing provisions, authority and responsibility provisions. An effort has been made to include those elements critical to…

  13. Estimating forest structure parameters within Fort Lewis Military Reservation using airborne laser scanner (LIDAR) data.

    Treesearch

    Hans-Erik Andersen; Jeffrey R. Foster; Stephen E. Reutebuch

    2003-01-01

    Three-dimensional (3-D) forest structure information is critical to support a variety of ecosystem management objectives on the Fort Lewis Military Reservation, including habitat assessment, ecological restoration, fire management, and commercial timber harvest. In particular, the Forestry Program at Fort Lewis requires measurements of shrub, understory, and overstory...

  14. 40 CFR 147.3200 - Fort Peck Indian Reservation: Assiniboine & Sioux Tribes-Class II wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...: Assiniboine & Sioux Tribes-Class II wells. 147.3200 Section 147.3200 Protection of Environment ENVIRONMENTAL... INJECTION CONTROL PROGRAMS Assiniboine and Sioux Tribes § 147.3200 Fort Peck Indian Reservation: Assiniboine & Sioux Tribes—Class II wells. The UIC program for Class II injection wells on all lands within the...

  15. 40 CFR 147.3200 - Fort Peck Indian Reservation: Assiniboine & Sioux Tribes-Class II wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...: Assiniboine & Sioux Tribes-Class II wells. 147.3200 Section 147.3200 Protection of Environment ENVIRONMENTAL... INJECTION CONTROL PROGRAMS Assiniboine and Sioux Tribes § 147.3200 Fort Peck Indian Reservation: Assiniboine & Sioux Tribes—Class II wells. The UIC program for Class II injection wells on all lands within the...

  16. 40 CFR 147.3200 - Fort Peck Indian Reservation: Assiniboine & Sioux Tribes-Class II wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...: Assiniboine & Sioux Tribes-Class II wells. 147.3200 Section 147.3200 Protection of Environment ENVIRONMENTAL... INJECTION CONTROL PROGRAMS Assiniboine and Sioux Tribes § 147.3200 Fort Peck Indian Reservation: Assiniboine & Sioux Tribes—Class II wells. The UIC program for Class II injection wells on all lands within the...

  17. 32 CFR 323.5 - Access to systems of records information.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) PRIVACY PROGRAM DEFENSE LOGISTICS AGENCY PRIVACY PROGRAM § 323.5 Access to systems of records... Logistics Agency, ATTN: DGA, 8725 John J. Kingman Road, Suite 1644, Fort Belvoir, VA 22060-6221. Any written... General Counsel, Defense Logistics Agency, ATTN: DGA, Suite 1644, 8725 John J. Kingman Road, Fort Belvoir...

  18. 32 CFR 323.5 - Access to systems of records information.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) PRIVACY PROGRAM DEFENSE LOGISTICS AGENCY PRIVACY PROGRAM § 323.5 Access to systems of records... Logistics Agency, ATTN: DGA, 8725 John J. Kingman Road, Suite 1644, Fort Belvoir, VA 22060-6221. Any written... General Counsel, Defense Logistics Agency, ATTN: DGA, Suite 1644, 8725 John J. Kingman Road, Fort Belvoir...

  19. Industrial Technology Modernization Program. Project 28. Automation of Receiving, Receiving Inspection and Stores

    DTIC Science & Technology

    1987-06-15

    001 GENERAL DYNAMICS 00 FORT WORTH DIVISION INDUSTRIAL TECHNOLOGY MODERNIZATION PROGRAM Phase 2 Final Project Repc t JUNG 0 ?7 PROJECT 28 AUTOMATION...DYNAMICS FORT WORTH DIVISION INDUSTRIAL TECHNOLOGY MODERNIZATION PROGRAM Phase 2 Final Project Report PROJECT 28 AUTOMATION OF RECEIVING, RECEIVING...13 6 PROJECT ASSUMPTIONS 20 7 PRELIMINARY/FINAL DESIGN AND FINDINGS 21 8 SYSTEM/EQUIPMENT/MACHINING SPECIFICATIONS 37 9 VENDOR/ INDUSTRY ANALYSIS

  20. Career Advancement and Work Support Services on the Job: Implementing the Fort Worth Work Advancement and Support Center Program. Executive Summary

    ERIC Educational Resources Information Center

    Schultz, Caroline; Seith, David

    2011-01-01

    The Work Advancement and Support Center (WASC) program in Fort Worth was part of a demonstration that is testing innovative strategies to help increase the income of low-wage workers, who make up a large segment of the U.S. workforce. The program offered services to help workers stabilize their employment, improve their skills, and increase their…

  1. Career Advancement and Work Support Services on the Job: Implementing the Fort Worth Work Advancement and Support Center Program

    ERIC Educational Resources Information Center

    Schultz, Caroline; Seith, David

    2011-01-01

    The Work Advancement and Support Center (WASC) program in Fort Worth was part of a demonstration that is testing innovative strategies to help increase the income of low-wage workers, who make up a large segment of the U.S. workforce. The program offered services to help workers stabilize their employment, improve their skills, and increase their…

  2. Task Order 2 enhanced preliminary assessment, Fort Douglas, Salt Lake City, Utah. Final report, October-December 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mirchandani, M.G.; Johnson, G.M.; Bove, L.J.

    1989-12-01

    An enhanced preliminary assessment (PA) of air pollution was conducted at Fort Douglas (FD) under the Base Closure Program. FD is an active military installation located in Salt Lake City, Utah. The Fort consists of the U.S. Army and Navy Reserve Centers, family housing units, a military museum, a chapel, clubs, swimming pool, a cemetery and various other support buildings. 50.8 acres of the 119 acres owned by FD are proposed to be excessed. Based on information obtained during the onsite visit and from available drawings and reports, three environmentally significant operations (ESOs) have been identified. These include asbestos, radonmore » and transformers. No immediate action has been recommended for any of the ESOs. Site investigations have been recommended for asbestos and the transformers. A radon sampling program is currently underway at FD. This radon sampling program is being conducted by Fort Carson; the results should be evaluated as they become available, and the appropriate actions taken.« less

  3. A century of meteorological observations at Fort Valley Experimental Forest: A cooperative observer program success story

    Treesearch

    Daniel P. Huebner; Susan D. Olberding; Byron Peterson; Dino DeSimone

    2008-01-01

    Meteorological observations at Fort Valley Experimental Forest began with its establishment as early silvicultural research made heavy use of meteorological data. The Fort Valley weather data represent the longest climatological record for northern Arizona with records dating back to 1909. Importance of long-term meteorological records and access to the weather record...

  4. A century of meteorological observations at Fort Valley Experimental Forest: A cooperative observer program success story (P-53)

    Treesearch

    Daniel P. Huebner; Susan D. Olberding; Byron Peterson; Dino DeSimone

    2008-01-01

    Meteorological observations at Fort Valley Experimental Forest began with its establishment as early silvicultural research made heavy use of meteorological data. The Fort Valley weather data represent the longest climatological record for northern Arizona with records dating back to 1909. Importance of long term meteorological records and access to the weather record...

  5. Biological Treatment of Solvent-Based Paint

    DTIC Science & Technology

    2011-01-01

    ESTCP Environmental Security Technology Certification Program FK-WTP Fort Kamehameha Wastewater Treatment Plant FTIR Fourier Transform Infrared...established by the Fort Kamehameha Wastewater Treatment Plant (FK-WTP) for the water; toxicity characteristic leaching procedure (TCLP) requirements for

  6. Historical review of Fort Valley studies on stand management

    Treesearch

    Peter F. Ffolliott

    2008-01-01

    One hundred years ago, the U.S. Forest Service launched a research program on the Fort Valley Experimental Forest to enhance the management of southwestern ponderosa pine (Pinus ponderosa) forests. This research program was the first scientific venture of its kind in the United States at the time it was initiated in 1908-and it is now the oldest in...

  7. Historical review of Fort Valley studies on stand management (P-53)

    Treesearch

    Peter F. Ffolliott

    2008-01-01

    One hundred years ago, the U.S. Forest Service launched a research program on the Fort Valley Experimental Forest to enhance the management of southwestern ponderosa pine (Pinus ponderosa) forests. This research program was the first scientific venture of its kind in the United States at the time it was initiated in 1908 - and it is now the oldest in the country. Much...

  8. 77 FR 42713 - Notice of Intent to Grant an Exclusive License; PadJack, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... Security Agency Technology Transfer Program, 9800 Savage Road, Suite 6541, Fort George G. Meade, MD 20755... Savage Road, Suite 6541, Fort George G. Meade, MD 20755-6541, telephone (443) 479-9569. Dated: July 17...

  9. South Carolina Cancer Health Equity Consortium: HBCU Student Summer Training Program

    DTIC Science & Technology

    2017-08-01

    TYPE OF REPORT: Annual PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT...SPONSORING / MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) U.S. Army Medical Research and Materiel Command Fort Detrick...Carolina. The goal of the South Carolina Cancer Health Equity Consortium: HBCU Student Summer Training Program is to provide a biomedical research

  10. Ground-Based Midcourse Defense (GMD) Sea-Based X-Band Radar (SBX) Placement and Operation, Adak, Alaska

    DTIC Science & Technology

    2005-08-03

    Finding of No Significant Impact and the Environmental Assessment for Theater Missile Defense Ground- Based Radar Testing Program at Fort Devens ...2000 "* Record of Decision for Site Preparation Activities at the Missile Defense System Test Bed at Fort Greely, Alaska, 2001 "* Record of Decision...to Establish a Ground-Based Midcourse Defense Initial Defensive Operations Capability at Fort Greely, Alaska, 2003 These documents are available at the

  11. 77 FR 57561 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-18

    ..., 8725 John J. Kingman Road, Fort Belvoir, VA 22060-6201.'' HDTRA 022 System name: Learning Management... replace with ``Defense Threat Reduction Agency employees and contractor personnel receiving training... & Program Development Division, 8725 John J. Kingman Road, Stop 6201, Fort Belvoir, VA 22060-6201...

  12. Facility Energy Decision System (FEDS) Assessment Report for Fort Buchanan, Puerto Rico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chvala, William D.; Solana, Amy E.; Dixon, Douglas R.

    2005-02-01

    This report documents the findings of the Facility Energy Decision System (FEDS) assessment at Fort Buchanan, Puerto Rico, by a team of PNNL engineers under contract to the Installation Management Agency (IMA) Southeast Region Office (SERO). Funding support was also provided by the Department of Energy's Federal Energy Management Program. The purpose of the assessment was to determine how energy is consumed at Fort Buchanan, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.

  13. Review of Army Officer Educational System. Volume 3. Annex A - Good Programs

    DTIC Science & Technology

    1971-12-01

    staff and faculty of the US Army Security Agency Training Center and School (USASATC&S), Fort Devens , Massachusetts, are constantly searching for new...INSTITUTE FOR THE BEHAVIORAL AND SOCIAL SCIENCES PO. BOX 2066. FORT NIENNING. GEORGIA 31005 PERI-IJ 8 Ausust 1979 SUBJECr: Shipment ol DUcu1oea1a Defensue J...100 "Intimate PSYOP" (USAIMA) A-O1 Exercise GOBBLER WOODS (USAMIA) A-103 Practical Training in the WOBC/OCC Courses (USAS/TC Fort McClellan) A-106

  14. 40 CFR 80.215 - What is the scope of the geographic phase-in program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... River Haakon Harding Jackson Jones Lawrence Meade Mellette Pennington Perkins Shannon Stanley Todd... Indian reservations follows: Burns Paiute, Cheyenne River, Colville, Duck Valley, Ely Colony, Fort Apache, Fort McDermitt, Goshute, Haulapai, Havasupai, Hopi, Kalispel, Navajo, Pine Ridge, Rosebud, Yakama, San...

  15. 40 CFR 80.215 - What is the scope of the geographic phase-in program?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... River Haakon Harding Jackson Jones Lawrence Meade Mellette Pennington Perkins Shannon Stanley Todd... Indian reservations follows: Burns Paiute, Cheyenne River, Colville, Duck Valley, Ely Colony, Fort Apache, Fort McDermitt, Goshute, Haulapai, Havasupai, Hopi, Kalispel, Navajo, Pine Ridge, Rosebud, Yakama, San...

  16. 40 CFR 80.215 - What is the scope of the geographic phase-in program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... River Haakon Harding Jackson Jones Lawrence Meade Mellette Pennington Perkins Shannon Stanley Todd... Indian reservations follows: Burns Paiute, Cheyenne River, Colville, Duck Valley, Ely Colony, Fort Apache, Fort McDermitt, Goshute, Haulapai, Havasupai, Hopi, Kalispel, Navajo, Pine Ridge, Rosebud, Yakama, San...

  17. Defense Base Realignment and Closure Budget Data for the Closure of Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-08-01

    provides the results of the audit of one project, valued at $2.75 million, for the closure and realignment of Fort Devens, Massachusetts. This audit also...assessed the adequacy of the management control program as it applied to the audit objective.

  18. 25 CFR 136.1 - Repayment contracts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Repayment contracts. 136.1 Section 136.1 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.1 Repayment contracts. A rehabilitation program was established on the Fort Hall Unit...

  19. Fort Collins Science Center: 2006 Accomplishments

    USGS Publications Warehouse

    Wilson, Juliette T.

    2007-01-01

    In Fiscal Year 2006 (FY06), the U.S. Geological Survey (USGS) Fort Collins Science Center (FORT) continued research vital to U.S. Department of the Interior (DOI) science and management needs and associated USGS programmatic goals. FORT work also supported the science needs of other governmental departments and agencies as well as private cooperators. Specifically, FORT scientific research and technical assistance focused on client and partner agency needs and goals in the areas of biological information management, fisheries and aquatic systems, invasive species, status and trends of biological resources, terrestrial ecosystems, and wildlife resources. Highlights of FORT project accomplishments are described below under the USGS science program area with which each task is most closely associated.2 The work of FORT’s five branches (in 2006: Aquatic Systems and Technology Applications, Ecosystem Dynamics, Invasive Species Science, Policy Analysis and Science Assistance, and Species and Habitats of Federal Interest) often involves major partnerships with other agencies or cooperation with other USGS disciplines (Geology, Geography, Water Resources).

  20. Distribution of Software Changes for Battlefield Computer Systems: A lingering Problem

    DTIC Science & Technology

    1983-06-03

    Defense, 10 June 1963), pp. 1-4. 3 Ibid. 4Automatic Data Processing Systems, Book - 1 Introduction (U.S. Army Signal School, Fort Monmouth, New Jersey, 15...January 1960) , passim. 5Automatic Data Processing Systems, Book - 2 Army Use of ADPS (U.S. Army Signal School, Fort Monmouth, New Jersey, 15 October...execute an application or utility program. It controls how the computer functions during a given operation. Utility programs are merely general use

  1. Industrial Technology Modernization Program. Project 20. Consolidation and Automation of Material and Tool Storage. Phase 2

    DTIC Science & Technology

    1987-06-15

    GENERAL DYNAMICS FORT WORTH DIVISION INDUSTRIAL TECHNOLOGY00 N MODERNIZATION PROGRAM Phase 2 Final Project Report DT C JUNO 7 1989J1K PROJECT 20...CLASSIFICATION O THIS PAGE All other editions are obsolete. unclassified Honeywell JUNE 15, 1987 GENERAL DYNAMICS FORT WORTH DIVISION INDUSTRIAL ...SYSTEMIEQUIPMENT/MACHINING SPECIFICATIONS 33 9 VENDOR/ INDUSTRY ANALYSIS FINDING 39 10 MIS REQUIREMENTS/IMPROVEMENTS 45 11 COST BENEFIT ANALYSIS 48 12 IMPLEMENTATION

  2. Water Management Plan for Fort Buchanan, Puerto Rico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chvala, William D.; Sullivan, Gregory P.; Mcmordie, Katherine

    2004-06-01

    This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Water Management Plan (WMP). The WRMP developed during this task is an amalgam of the templates and guidelines from the Federal Energy Management Program and Army regulations.

  3. Fort Benton Science Curriculum Outline.

    ERIC Educational Resources Information Center

    Fort Benton Public Schools, MT.

    The science curriculum for the Fort Benton school system was developed with funds under Title III of the Elementary and Secondary Education Act to give students the background of a modern and forward-looking program in science taught in an imaginative, investigative, and inquiry-oriented fashion. The science curriculum guide outlines a planned…

  4. Feasibility Study of Food Waste Co-Digestion at U.S. Army Installations

    EPA Science Inventory

    Net Zero is a comprehensive approach to preserve natural resources by focusing on energy, water, and waste. Fort Huachuca, Arizona, is a strong advocate and participant in the Army Net Zero program. The Fort has installed energy saving and renewable energy generating systems, an...

  5. Fort Collins Science Center: Fiscal Year 2007 Accomplishments

    USGS Publications Warehouse

    Wilson, J.T.

    2008-01-01

    In Fiscal Year 2007 (FY07), the U.S. Geological Survey (USGS) Fort Collins Science Center (FORT) continued research vital to U.S. Department of the Interior science and management needs and associated USGS programmatic goals. FORT work also supported the science needs of other government agencies as well as private cooperators. Specifically, FORT scientific research and technical assistance focused on client and partner needs and goals in the areas of biological information management, fisheries and aquatic systems, invasive species, status and trends of biological resources, terrestrial ecosystems, and wildlife resources. In addition, FORT's 5-year strategic plan was refined to incorporate focus areas identified in the USGS strategic science plan, including ecosystem-landscape analysis, global climate change, and energy and mineral resource development. As a consequence, several science projects initiated in FY07 were either entirely new research dor amplifications of existing work. Highlights of FORT project accomplishments are described below under the USGS science program with which each task is most closely associated. The work of FORT's 6 branches (Aquatic Systems and Technology Applications, Ecosystem Dynamics, Information Science, Invasive Species Science, Policy Analysis and Science Assistance, and Species and Habitats of Federal Interest) often involves major partnerships with other agencies or cooperation with other USGS disciplines (Geology, Geography, Water Resources) and the Geospatial Information Office.

  6. Environmental Assessment and Finding of No Significant Impact (FONSI) of the Underground Technology Program, Rodgers Hollows, Fort Knox, Kentucky

    DTIC Science & Technology

    1994-10-01

    Technical Report SL-94-21 October 1994 •(rn US Army Corps 00• of Engineers CM Waterways Experiment , Station Environmental Assessment and Finding of...Underground Technology Program, Rodgers Hollow, Fort Knox, KY by D.W. Murrell. J. S. Shore U.S. Army Corps of Engineers Waterways Experiment Station 3909...Evaluation. I. Shore, J. S. II. Unitedl States. Army. Corl:, of Engineers . Ull. U.S. Army En- gineer Waterways Experiment Station. IV. Structures

  7. Word Frequency Analysis. MOS: 55B. Skill Levels 1 & 2.

    DTIC Science & Technology

    1981-05-01

    AO-AX17 176 ARMY TRAINING DEVELOPMENT$ INS? FORT MONROE VA F/G 5/9WORD FREQUENCY ANALYSIS. NMIS 55. SKILL LEVELS I 2.(U~) MAY SI A A LONSO...UNCLASSIFIED MOS-558 NLSill AD A1171 7 6 HEADQUARTERS DATA CONTROL NNE UNITED STATES ARMY TRAINING AND DOCTRINE COMMAND FORT MONROE, VIRGINIA 23651 . 1w 0 a~t L...O.OANIZATION HA.ME AND ADDRESS 0. PROGRAM ELEMENT. P’IUJECT. TASKAREA At WO K UNIT HM;lEHS Training Developments Institute R ATTN: ATTG-DOR Fort Monroe. VA 71651

  8. Investigation of Radiometric Combustion Monitoring Techniques for Coal- Fired Stoker Boilers

    DTIC Science & Technology

    1993-09-01

    Office ATTN: CECPW-FU-P 22060 Ft Devens 01433 US Army Envr Hygiene Agency ATTN: AFZD-DE ATTN: HSHB-ME 21010 US Army Engr District Fort Drum 13602 ATTN...Library (40) ATTN: AFZS-EH-E US Gov’t Printing Office 20401 Fort Irwin 92310 ATFN: Rac SecDeposit Sac (2) US Army Engr Division ATTN: AFZJ-EH ATTN...66 USACERL DISTRIBUTION Chief of Engiaes Fort McCoy 54656 Tyndall AFB 32403 ATTN: CEHEC-IM-LH (2) ATTN: AFZR-DE ATTN: AFESC Program O(c ATTN: CEHEC-IM

  9. 78 FR 25259 - Notice of Intent To Grant an Exclusive License; Integrata Security, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ..., 9800 Savage Road, Suite 6848, Fort George G. Meade, MD 20755-6848. FOR FURTHER INFORMATION CONTACT: Marian T. Roche, Director, Technology Transfer Program, 9800 Savage Road, Suite 6848, Fort George G. Meade, MD 20755-6848, telephone (443) 634-3514. Dated: April 24, 2013. Aaron Siegel, Alternate OSD...

  10. 75 FR 33838 - National Environmental Policy Act; Scientific Balloon Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-15

    ... may be viewed at the following locations: (a) Fort Sumner Public Library, 235 West Sumner Avenue, Fort Sumner, New Mexico 88119 (575-355-2832). (b) Palestine Public Library, 1101 North Cedar Street, Palestine, Texas 75801 (903-729-4121). (c) NASA Headquarters Library, Room 1J20, 300 E Street, SW., Washington, DC...

  11. Opening remarks for the Fort Valley Centennial Celebration

    Treesearch

    G. Sam Foster

    2008-01-01

    The Rocky Mountain Research Station recognizes and values the contributions of our scientists and collaborators for their work over the past century at Fort Valley Experimental Forest. With the help of our partners and collaborators, Rocky Mountain Research Station is working to improve coordination across its research Program Areas and Experimental Forests and Ranges...

  12. Youth Environmental Science Outreach in the Mushkegowuk Territory of Subarctic Ontario, Canada

    ERIC Educational Resources Information Center

    Karagatzides, Jim D.; Kozlovic, Daniel R.; De Iuliis, Gerry; Liberda, Eric N.; General, Zachariah; Liedtke, Jeff; McCarthy, Daniel D.; Gomez, Natalya; Metatawabin, Daniel; Tsuji, Leonard J. S.

    2011-01-01

    We connected youth of the Mushkegowuk Territory (specifically Fort Albany First Nation) with environmental science and technology mentors in an outreach program contextualized to subarctic Ontario that addressed some of the environmental concerns identified by members of Fort Albany First Nation. Most activities were community-based centering on…

  13. Automated knowledge-base refinement

    NASA Technical Reports Server (NTRS)

    Mooney, Raymond J.

    1994-01-01

    Over the last several years, we have developed several systems for automatically refining incomplete and incorrect knowledge bases. These systems are given an imperfect rule base and a set of training examples and minimally modify the knowledge base to make it consistent with the examples. One of our most recent systems, FORTE, revises first-order Horn-clause knowledge bases. This system can be viewed as automatically debugging Prolog programs based on examples of correct and incorrect I/O pairs. In fact, we have already used the system to debug simple Prolog programs written by students in a programming language course. FORTE has also been used to automatically induce and revise qualitative models of several continuous dynamic devices from qualitative behavior traces. For example, it has been used to induce and revise a qualitative model of a portion of the Reaction Control System (RCS) of the NASA Space Shuttle. By fitting a correct model of this portion of the RCS to simulated qualitative data from a faulty system, FORTE was also able to correctly diagnose simple faults in this system.

  14. Fort Hamilton High School. Project ELITES: Education for Life Through Extended Services. O.E.E. Evaluation Report, 1981-1982.

    ERIC Educational Resources Information Center

    Torres, Judith A.; And Others

    Project ELITES provides bilingual education to 307 Spanish-speaking, Arabic-speaking, and Greek-speaking students at Fort Hamilton High School, Brooklyn, New York. Project ELITES's philosophy is to mainstream students after two years of participation. The program's individualized approach is obtained through a 3-tiered instructional format:…

  15. Opening remarks for the Fort Valley Centennial Celebration (P-53)

    Treesearch

    G. Sam Foster

    2008-01-01

    The Rocky Mountain Research Station recognizes and values the contributions of our scientists and collaborators for their work over the past century at Fort Valley Experimental Forest. With the help of our partners and collaborators, Rocky Mountain Research Station is working to improve coordination across its research Program Areas and Experimental Forests and Ranges...

  16. TBI Endpoints Development

    DTIC Science & Technology

    2015-10-01

    Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for Public Release; Distribution Unlimited The...SPONSORING / MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) U.S. Army Medical Resear ch and Materiel Command Fort Detrick...DDT) and Medical Device Development Tool (MDDT) programs with case study presentations and question and answer opportunities. Expert Working Groups

  17. Fort Collins Science Center fiscal year 2010 science accomplishments

    USGS Publications Warehouse

    Wilson, Juliette T.

    2011-01-01

    The scientists and technical professionals at the U.S. Geological Survey (USGS), Fort Collins Science Center (FORT), apply their diverse ecological, socioeconomic, and technological expertise to investigate complicated ecological problems confronting managers of the Nation's biological resources. FORT works closely with U.S. Department of the Interior (DOI) agency scientists, the academic community, other USGS science centers, and many other partners to provide critical information needed to help answer complex natural-resource management questions. In Fiscal Year 2010 (FY10), FORT's scientific and technical professionals conducted ongoing, expanded, and new research vital to the science needs and management goals of DOI, other Federal and State agencies, and nongovernmental organizations in the areas of aquatic systems and fisheries, climate change, data and information integration and management, invasive species, science support, security and technology, status and trends of biological resources (including the socioeconomic aspects), terrestrial and freshwater ecosystems, and wildlife resources, including threatened and endangered species. This report presents selected FORT science accomplishments for FY10 by the specific USGS mission area or science program with which each task is most closely associated, though there is considerable overlap. The report also includes all FORT publications and other products published in FY10, as well as staff accomplishments, appointments, committee assignments, and invited presentations.

  18. Warrior Model for Human Performance and Injury Prevention: Eagle Tactical Athlete Program (ETAP) Part II.

    PubMed

    Sell, Timothy C; Abt, John P; Crawford, Kim; Lovalekar, Mita; Nagai, Takashi; Deluzio, Jennifer B; Smalley, Brain W; McGrail, Mark A; Rowe, Russell S; Cardin, Sylvain; Lephart, Scott M

    2010-01-01

    Physical training for United States military personnel requires a combination of injury prevention and performance optimization to counter unintentional musculoskeletal injuries and maximize warrior capabilities. Determining the most effective activities and tasks to meet these goals requires a systematic, research-based approach that is population specific based on the tasks and demands of the Warrior. The authors have modified the traditional approach to injury prevention to implement a comprehensive injury prevention and performance optimization research program with the 101st Airborne Division (Air Assault) at Fort Campbell, KY. This is second of two companion papers and presents the last three steps of the research model and includes Design and Validation of the Interventions, Program Integration and Implementation, and Monitor and Determine the Effectiveness of the Program. An 8-week trial was performed to validate the Eagle Tactical Athlete Program (ETAP) to improve modifiable suboptimal characteristics identified in Part I. The experimental group participated in ETAP under the direction of a ETAP Strength and Conditioning Specialist while the control group performed the current physical training at Fort Campbell under the direction of a Physical Training Leader and as governed by FM 21-20 for the 8-week study period. Soldiers performing ETAP demonstrated improvements in several tests for strength, flexibility, performance, physiology, and the APFT compared to current physical training performed at Fort Campbell. ETAP was proven valid to improve certain suboptimal characteristics within the 8-week trial as compared to the current training performed at Fort Campbell. ETAP has long-term implications and with expected greater improvements when implemented into a Division pre-deployment cycle of 10-12 months which will result in further systemic adaptations for each variable.

  19. Pilot Study to Aid in the Designing of Research on the Officer Candidate Training Program. PJ-3407-01

    DTIC Science & Technology

    1952-08-01

    Coadidate Scbhol, Aberden Proving Oromds, Md. 20 G The Antiaircraft sa OuGided Misiles Brach Officer Canidate School, Fort B11.., Temaw 22 9 The Army...M4onmouth, N. J. R The Infantry Officer Candidate School, Fort BenninG, Georgia F The Ordnance Officer Candidate School, Aberdeen Proving Grounds , Md

  20. Targeting Phosphatidylserine for Radioimmunotherapy of Breast Cancer Brain Metastasis

    DTIC Science & Technology

    2013-10-01

    Pharmaceuticals , Inc., Department of Defense grants PC05031 (to P.E. Thorpe) and PC080475 (to Y. Yin), an NIH-supported Small Animal Imaging Research Program...PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012...Army Medical Research And Materiel Command 11. SPONSOR/MONITOR’S REPORT Fort Detrick, Maryland NUMBER(S) 21702-5012 12. DISTRIBUTION / AVAILABILITY

  1. Fort Valley Experimental Forest-A Century of Research 1908-2008

    Treesearch

    Susan D. Olberding; Margaret M. Moore

    2008-01-01

    One hundred years ago, the USFS began its forest research program in a two-room cabin near Flagstaff, Arizona, with one staff person, Gustaf A. Pearson. The site became known as the Fort Valley Experiment Station and was the first in a national network of research sites developed to address uncertainties regarding the rehabilitation and conservation for forest and...

  2. Fort Valley Experimental Forest-A Century of Research 1908-2008 (P-53)

    Treesearch

    Susan D. Olberding; Margaret M. Moore

    2008-01-01

    One hundred years ago, the USFS began its forest research program in a two-room cabin near Flagstaff, Arizona, with one staff person, Gustaf A. Pearson. The site became known as the Fort Valley Experiment Station and was the first in a national network of research sites developed to address uncertainties regarding the rehabilitation and conservation for forest and...

  3. Annual Report of Indian Education in Montana. Johnson-O'Malley Activities, Fiscal Year 1978.

    ERIC Educational Resources Information Center

    Montana State Office of the Superintendent of Public Instruction, Helena.

    During fiscal year 1978, the Montana Office of Public Instruction administered Johnson-O'Malley (JOM) Act funds totaling $684,200 for projects affecting 4,501 eligible students on the Crow, Fort Peck, Fort Belknap, and Rocky Boy's Indian Reservations. Funds were awarded on a per capita basis to provide supplemental educational programs for Indian…

  4. Second Forest Vegetation Simulator Conference; February 12-14, 2002; Fort Collins, CO.

    Treesearch

    Nicholas L. Crookston; Robert N. Havis

    2002-01-01

    The Forest Vegetation Simulator (FVS) is a computer program that projects the development of forest stands in the United States and British Columbia, Canada. The proceedings of the second FVS conference, held in Fort Collins, CO, includes 34 papers dealing with applications of FVS that range from the stand-level through full-scale landscape analyses. Forecasts ranging...

  5. Fusion Genes Predict Prostate Cancer Recurrence

    DTIC Science & Technology

    2017-10-01

    we will develop a training program centered on genomics and cell culturing methods to train new investigators to carry out research in benign urologic...Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for Public Release; Distribution...MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland

  6. Half a century of research - Fort Valley Experimental Forest 1908-1958

    Treesearch

    Edward M. Gaines; Elmer W. Shaw

    1958-01-01

    Fifty years ago in 1908, the U. S. Forest Service launched its research program in forest management on the Fort Valley Experimental Forest near Flagstaff, Arizona. This was the first scientific venture of its kind in America - - now the oldest.From the beginning the chief aim of research here has been to work out better ways of managing ponderosa...

  7. Landscape Scale Assessment of Predominant Pine Canopy Height for Red-cockaded Woodpecker Habitat Assessment Using Light Detection and Ranging (LIDAR) Data

    DTIC Science & Technology

    2011-03-26

    forest patches extracted from GAP landcover for Fort Bragg study area...7 7 Individual pine forest patches extracted from GAP landcover for Fort Bragg...University for their assis- tance in acquiring Gap Analysis Program (GAP) landcover maps for the study regions. Natalie Myers and James Westervelt of U.S

  8. Roots of research: Raphael Zon and the origins of forest experiment stations

    Treesearch

    Jeremy C. Young

    2008-01-01

    The 1908 founding of the first American forest experiment station in Fort Valley, Arizona was an event of considerable historical significance. The Fort Valley station was the linchpin of forester Raphael Zon's bold plan to create the first program of organized research in U.S. Forest Service history. It also represented the beginning of a fruitful marriage...

  9. Proceedings of the Annual U.S. Army Operations Research Symposium (13th) , AORS XIII, Held at Fort Lee, Virginia on 29 October - 1 November 1974, Co- Hosted by Army Logistics Center, Fort Lee, Virginia and Army Quartermaster Center and Fort Lee, Virginia. Volume 1

    DTIC Science & Technology

    1974-11-01

    Challenge to Operations Research" 263 Mr. R. H. Adams Mr..F. P. Paca Mr. A. T. Sylvester "A Combat Rates Logistics Analysis...Staff; if we average a tour of duty in the Pentagon as three years, the Army has had eight successive generations of planners and operators in the...doctrine, originally enunciated for Greece and Turkey, brought the Army full tilt into the Military Assistance Program ( MAP ) as this contributed to

  10. Molecular genetics at the Fort Collins Science Center

    USGS Publications Warehouse

    Oyler-McCance, S.J.; Stevens, P.D.

    2011-01-01

    The Fort Collins Science Center operates a molecular genetic and systematics research facility (FORT Molecular Ecology Laboratory) that uses molecular genetic tools to provide genetic information needed to inform natural resource management decisions. For many wildlife species, the data generated have become increasingly important in the development of their long-term management strategies, leading to a better understanding of species diversity, population dynamics and ecology, and future conservation and management needs. The Molecular Ecology Lab serves Federal research and resource management agencies by developing scientifically rigorous research programs using nuclear, mitochondrial and chloroplast DNA to help address many of today's conservation biology and natural resource management issues.

  11. Dr. Ivan J. Birrer: Service at the Command and General Staff College, Fort Leavenworth, Kansas, 20 January 1948 to 30 June 1978

    DTIC Science & Technology

    1978-04-21

    sentially a brand new program for 1957-59, I realized that theLp :’as an opportmnity to effect Vhat I had lng thought would be a real improvement in the...War College at Fort Leavenworth Effect of Korean W’ar on CGSC Specialized Instruction Instructor Training Program Design of Bell Hall . 4, -.- 1 A...cover? A: There are a couple of points I did not mention that merit some attention because if their subsequent infiuence _r effect here at the college

  12. Community Environmental Response Facilitation Act (CERFA) report, Fort Holabird Crime Records Center, Baltimore, Maryland

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Public Laws designated more than 100 Department of Army facilities for closure and realignment. As a result, it became necessary to expedite the environmental investigation and cleanup process, as necessary, prior to the release and reuse of Army Base Realignment and Closure (BRAC) property. The BRAC environmental restoration program was established in 1989 with the first round (BRAC 88) of base closures and continued with subsequent rounds (BRAC 91, BRAC 93, etc.). As a result of the BRAC program, Fort Holabird Crime Records Center has been investigated to determine its environmental condition.

  13. Adult School for Cuban Refugees, Fort Indiantown Gap, Pennsylvania. Final Report, August 25-November 28, 1980.

    ERIC Educational Resources Information Center

    Central Susquehanna Intermediate Unit 16, Lewisburg, PA.

    The Adult School for Cuban Refugees, operated by the Central Susquehanna Intermediate Unit in 1980, supplied services to approximately 1,200 Cuban refugees in the six weeks of its operation at Fort Indiantown Gap, Pennsylvania. The program offered basic oral English classes to adults ranging in age from 18 to 81 years. The classes were conducted…

  14. Roots of research: Raphael Zon and the origins of forest experiment stations (P-53)

    Treesearch

    Jeremy C. Young

    2008-01-01

    The 1908 founding of the first American forest experiment station in Fort Valley, Arizona was an event of considerable historical significance. The Fort Valley station was the linchpin of forester Raphael Zon’s bold plan to create the first program of organized research in US Forest Service history. It also represented the beginning of a fruitful marriage between...

  15. Municipal Stormwater Monitoring Program, Dallas-Fort Worth area, Texas: Summary of sampling, February 1997-February 2000

    USGS Publications Warehouse

    Moore, Stephanie J.; Raines, Timothy H.; Baldys, Stanley

    2000-01-01

    During 1992–94, the U.S. Geological Survey (USGS), in cooperation with the North Central Texas Council of Governments (NCTCOG) collected stormwater runoff data for the cities and Texas Department of Transportation (TxDOT) Districts in the Dallas-Fort Worth (DFW) area to meet the regulatory requirements of the application phase for the National Pollutant Discharge Elimination System (NPDES) stormwater permit. The Phase I permit requirements applied to cities with populations of 100,000 or greater and to TxDOT districts with population centers of 100,000 or greater (U.S. Environmental Protection Agency, 1990). The following cities and districts in the DFW area met the population criteria: Arlington, Dallas, Fort Worth, Garland, Irving, Mesquite, Plano, TxDOT Dallas District, and TxDOT Fort Worth District. The permit applications were submitted to the U.S. Environmental Protection Agency (EPA) for approval.

  16. The Navajo Nation Radon Program

    EPA Pesticide Factsheets

    The Bois Forte Indoor Air Quality Program acted swiftly and aggressively to tackle mold and moisture problems in its community members’ homes after several residents became ill as a result of environmental exposures.

  17. Can Local Voluntary Environmental Programs "Work"? An Examination of Fort Collins' (Colorado) Climate Wise Program

    NASA Astrophysics Data System (ADS)

    Samantha, Mosier; Jonathan, Fisk

    2013-05-01

    Previous research on voluntary environmental programs (VEPs) frequently assesses the effectiveness of federal, state, and third party programs and why organizations seek to join such programs. Yet, research has yet to evaluate the effectiveness or firm motivation relative to local VEPs. Recognizing this gap, our paper examines the structure and organization of Fort Collins' Climate Wise program, a local VEP. Using a variety of sources, we find that the program has successfully met both short- and long-term goals by persistently self-evaluating and seeking outside financial support. Findings from this analysis can aid in understanding and developing local VEPs elsewhere. Specifically, this initial research suggests that local VEPs need to consider local context and available resources when implementing such programs. Furthermore, it is possible for local VEPs to attract a diverse variety of participating firms by avoiding one-size-fits-all participation levels and by establishing a sense of ownership among partners.

  18. Can local voluntary environmental programs "work"? An examination of Fort Collins' (Colorado) climate wise program.

    PubMed

    Mosier, Samantha; Samantha, Mosier; Fisk, Jonathan; Jonathan, Fisk

    2013-05-01

    Previous research on voluntary environmental programs (VEPs) frequently assesses the effectiveness of federal, state, and third party programs and why organizations seek to join such programs. Yet, research has yet to evaluate the effectiveness or firm motivation relative to local VEPs. Recognizing this gap, our paper examines the structure and organization of Fort Collins' Climate Wise program, a local VEP. Using a variety of sources, we find that the program has successfully met both short- and long-term goals by persistently self-evaluating and seeking outside financial support. Findings from this analysis can aid in understanding and developing local VEPs elsewhere. Specifically, this initial research suggests that local VEPs need to consider local context and available resources when implementing such programs. Furthermore, it is possible for local VEPs to attract a diverse variety of participating firms by avoiding one-size-fits-all participation levels and by establishing a sense of ownership among partners.

  19. Helmet Integrated Nanosensors, Signal Processing and Wireless Real Time Data Communication for Monitoring Blast Exposure to Battlefield Personnel

    DTIC Science & Technology

    2009-12-01

    of the Congressionally Directed Medical Research Programs (CDMRP) # PT073804 II. BACKGROUND Unlike the painfully obvious losses seen in Alzheimer ...Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for...AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702

  20. Tourism, Tolerance, or Hospitality? An Assessment of a Native/Non-Native, Urban/Rural Youth Exchange Program between Fort Good Hope, NWT, and East Vancouver, BC

    ERIC Educational Resources Information Center

    Hern, Matt

    2009-01-01

    This article considers and assesses a youth exchange project between two community-based youth centers: The Purple Thistle Centre in East Vancouver, British Columbia, and the K'asho Got'ine Youth Centre in Fort Good Hope, Northwest Territories. Both centers serve primarily low-income youth, but after that the similarities are very few. The…

  1. Preliminary Guidelines for Installation Product Line Land Management Suite (LMS) Product Developers

    DTIC Science & Technology

    2005-01-01

    land use patterns might call a storm simulation model available as a CDF service to evaluate the ability of the pattern to maintain water quality ...Analysis GIS data Server Internal DIAS objects External DIAS objects External CDF services Fort Future DIAS Model GUI Figure 10. A Fort Future DIAS...31 iv ERDC/CERL TR-05-1 Are Programs that Analyze Data Being Developed as CDF Services

  2. 40 CFR 147.1351 - EPA-administered program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false EPA-administered program. 147.1351... (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Montana § 147.1351 EPA... within the exterior boundaries of the Fort Peck Indian Reservation, is administered by EPA. This program...

  3. 40 CFR 147.1351 - EPA-administered program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false EPA-administered program. 147.1351... (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Montana § 147.1351 EPA... within the exterior boundaries of the Fort Peck Indian Reservation, is administered by EPA. This program...

  4. 40 CFR 147.1351 - EPA-administered program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false EPA-administered program. 147.1351... (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Montana § 147.1351 EPA... within the exterior boundaries of the Fort Peck Indian Reservation, is administered by EPA. This program...

  5. 40 CFR 147.1351 - EPA-administered program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false EPA-administered program. 147.1351... (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Montana § 147.1351 EPA... within the exterior boundaries of the Fort Peck Indian Reservation, is administered by EPA. This program...

  6. 40 CFR 147.1351 - EPA-administered program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false EPA-administered program. 147.1351... (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Montana § 147.1351 EPA... within the exterior boundaries of the Fort Peck Indian Reservation, is administered by EPA. This program...

  7. 32 CFR 636.6 - Remedial driver training program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Fort... alcohol and drug rehabilitation programs in accordance with AR 190-5, paragraphs 2-12c and d, and 5-4f (32...

  8. 32 CFR 636.6 - Remedial driver training program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Fort... alcohol and drug rehabilitation programs in accordance with AR 190-5, paragraphs 2-12c and d, and 5-4f (32...

  9. Assessment of Consumer Health Education Needs of DeWitt MEDDAC, Fort Belvoir, Virginia.

    DTIC Science & Technology

    1975-03-01

    current patient education programs; to determine educational methodologies used for current patient education programs; to determine resources, both...technological and personnel, used for current patient education programs; to systematically identify local consumer health education needs from input by

  10. A Study of Strategic Lessons Learned in Vietnam. Volume 7. The Soldier

    DTIC Science & Technology

    1980-04-11

    problems, the nature of society, and the quality of training. Other factors affecting mental health which were unique to or especially significant in...the drug abuse problem, especially its increasing rate after 1968. Initiatives at drug education/ orientation programs had little effect because of... especially for duty in Vietnam. 46/ CONARC established the initial ccurses at Fort Knox and Fort Sill, and instruction *:n 13 separate military occupation

  11. Darton College Customized Nursing Program for the Fort Benning Community and Research Project

    DTIC Science & Technology

    2015-01-01

    learning if transferred out of the Fort Benning area. • Creating special review resources provided for use on netbooks or computers so that students...stated that without this added flexibility their progression towards graduation would not have been possible. Netbook /laptop versions of nursing core...for the development of netbook /laptop version of Human Growth and Development (PSYC 2103); however this was modified when the nursing curriculum

  12. Performance and economic evaluation of the seahorse natural gas hot water heater conversion at Fort Stewart. Interim report, 1994 Summer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Winiarski, D.W.

    1995-01-01

    The federal government is the largest single energy consumer in the United States cost valued at nearly $10 billion annually. The US Department of Energy`s (DOE) Federal Energy Management Program (FEMP) supports efforts to reduce energy use and associated expenses in the federal sector. One such effort, the New Technology Demonstration Program (NTDP), seeks to evaluate new energy-saving US technologies and secure their more timely adoption by the US government. Pacific Northwest Laboratory (PNL) is one of four DOE laboratories that participate in the New Technologies Demonstration Program, providing technical expertise and equipment to evaluate new, energy-saving technologies being studiedmore » under that program. This interim report provides the results of a field evaluation that PNL conducted for DOE/FEMP and the US Department of Defense (DoD) Strategic Environmental Research and Development Program (SERDP) to examine the performance of a candidate energy-saving technology-a hot water heater conversion system to convert electrically heated hot water tanks to natural gas fuel. The unit was installed at a single residence at Fort Stewart, a US Army base in Georgia, and the performance was monitored under the NTDP. Participating in this effort under a Cooperative Research and Development Agreement (CRADA) were Gas Fired Products, developers of the technology; the Public Service Company of North Carolina; Atlanta Gas Light Company; the Army Corps of Engineers; Fort Stewart; and Pacific Northwest Laboratory.« less

  13. Incidence of admission to the Physical Training and Rehabilitation Programs in Initial Entry Training during fiscal year 2011.

    PubMed

    Devlin, Jevettra D; Knapik, Joseph J; Solomon, Zack; Hauret, Keith G; Morris, Krystal; Carter, Robert; McGill, Ryan; Paoli, Latondra

    2014-05-01

    The Physical Training and Rehabilitation Program (PTRP) is a recovery and reintegration program for recruits in Initial Entry Training (IET) who are unable to continue training because of serious injury. This investigation examined PTRP admission incidence among recruits in IET at Forts Jackson, Leonard Wood, Benning, and Sill during Fiscal Year 2011 (FY11). PTRP admission data were collected from a spreadsheet completed monthly by PTRP commanders. Total number of recruits was obtained from each post's Directorate of Programs, Training, and Management. In FY11, 368 men and 268 women were admitted into PTRPs at all installations. For Forts Jackson, Leonard Wood, Benning, and Sill, male admission incidences (cases/1,000 recruits) were 2.6, 3.0, 6.2, and 5.4, respectively; female admission incidences for Forts Jackson, Leonard Wood, and Sill, were 11.1, 10.1, and 22.6, respectively. Most injuries sent to PTRP were bone stress injuries (65%) or fractures (21%). 76% of recruits were returned to duty. Differences in admission incidence between posts appear primarily related to different local policies regarding convalescent leave and admission criteria. PTRP admission rates are lower than in the past, presumably related to policy changes and injury-reduction efforts. A cost-benefit analysis would assist in determining the value of the PTRP. Reprint & Copyright © 2014 Association of Military Surgeons of the U.S.

  14. Lessons from the Army’s Future Combat Systems Program

    DTIC Science & Technology

    2012-01-01

    FCS, from the Aviation Center at Fort Rucker, Alabama, to the Chemical and Engineer Schools at Fort Leonard Wood , Mis- souri.75 The objective was to...Engineer) and Robert Woods (MGV LSI Chief Engineer), “MGV Platform Review,” circa February 2009. Not available to the general public. 22 Daniel Wasserbly...Acquisition Decision Memo- randum,” memorandum for Secretary of the Army, June 23, 2009. 59 Matt Donohue, Kris Gardner, and Major Scot Greig, “Future Combat

  15. HBCU Summer Undergraduate Training Program in Prostate Cancer: A Partnership Between USU-CPDR and UDC

    DTIC Science & Technology

    2017-10-01

    Bethesda, MD 20817 REPORT DATE: October 2017 TYPE OF REPORT: Annual PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort...AUTHOR(S) Shiv Srivastava, PhD; Taduru Sreenath, PhD; Center for Prostate Disease Research , Dept of Surgery, Uniformed Services University of the...Army Medical Research Materiel Command Fort Detrick, MD 21702-5012 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12

  16. Treatment-Based Classification versus Usual Care for Management of Low Back Pain

    DTIC Science & Technology

    2014-08-01

    Doctoral Fellowship in Orthopaedic Manual Physical Therapy , San Antonio Military Medical Center, Fort Sam Hous- ton, Texas. N.W. Gill, PT, DSc, OCS, FAAOMPT...US Army–Baylor Uni- versity Doctor of Physical Therapy Program, Fort Sam Houston, Texas. [Rhon DI, Deyle GD, Gill NW. Clin- ical reasoning and...1234–1243.] © 2013 American Physical Therapy Association Published Ahead of Print: February 7, 2013 Accepted: February 4, 2013 Submitted: March 30, 2012

  17. Outcomes of Fort Jackson's Physical Training and Rehabilitation Program in army basic combat training: return to training, graduation, and 2-year retention.

    PubMed

    Hauret, Keith G; Knapik, Joseph J; Lange, Jeffrey L; Heckel, Heidi A; Coval, Dana L; Duplessis, David H

    2004-07-01

    Basic trainees at Fort Jackson, South Carolina, who were unable to continue basic combat training (BCT) because of a serious injury were assigned to the Physical Training and Rehabilitation Program (PTRP). Between January 3, 1998 and July 24, 2001, 4258 trainees were assigned to the PTRP. Using a retrospective cohort study design, return to training and BCT graduation rates were evaluated. PTRP graduates were compared with matched non-PTRP graduates for 2-year retention in the Army. More PTRP women than men were discharged from the PTRP (60% and 48%, respectively, p < 0.01). Of PTRP trainees returning to BCT, 10% and 12% of men and women, respectively, were discharged from the Army compared with overall Fort Jackson discharge rates of 9% and 15% for men and women, respectively. Comparing PTRP graduates to matched non-PTRP graduates, there were no differences in 2-year retention for men (14.9% and 14.7%, respectively; p = 0.93) or women (26.6% and 30.1%, respectively; p = 0.19). Despite the high discharge rate in the PTRP, the BCT discharge rate for trainees who successfully rehabilitated was similar to the overall discharge rate at Fort Jackson. The 2-year retention in service for PTRP trainees who graduated from BCT was similar to that of non-PTRP trainees.

  18. 78 FR 47487 - Notice of Proposed Buy America Waiver

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-05

    ... (NFRMPO). NFRMPO is in the process of procuring vehicles for its vanpool program, ``VanGo.'' In accordance... Organization (NFRMPO). NFRMPO operates a vanpool (``VanGo'') program, which has 75 vans with routes connecting, among others, Fort Collins, Loveland, Greeley, Denver, and Boulder, Colorado. The VanGo program carries...

  19. The Federal Public Works Infrastructure Strategy Program - Federal Works Infrastructure R&D: A New Perspective

    DTIC Science & Technology

    1993-07-01

    Strategy, please contact Robert A. Pietrowsky , Program Manager at: Institute for Water Resources Casey Building 7701 Telegraph Road Fort Belvoir, VA 22060...management responsibility under the direction of Dr. Eugene Z. Stakhiv, Chief, Policy and Special Studies Division and Mr. Robert A. Pietrowsky , Program

  20. ALARA and decommissioning: The Fort St. Vrain experience

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Borst, T.; Niehoff, M.; Zachary, M.

    1995-03-01

    The Fort St. Vrain Nuclear Generating Station, the first and only commercial High Temperature Gas Cooled Reactor to operate in the United States, completed initial fuel loading in late 1973 and initial startup in early 1974. Due to a series of non-nuclear technical problems, Fort St. Vrain never operated consistently, attaining a lifetime capacity factor of slightly less than 15%. In August of 1989, the decision was made to permanently shut down the plant due to control rod drive and steam generator ring header failures. Public Service Company of Colorado elected to proceed with early dismantlement (DECON) as opposed tomore » SAFSTOR on the bases of perceived societal benefits, rad waste, and exposure considerations, regulatory uncertainties associated with SAFSTOR, and cost. The decommissioning of Fort St. Vrain began in August of 1992, and is scheduled to be completed in early 1996. Decommissioning is being conducted by a team consisting of Westinghouse, MK-Ferguson, and Scientific Ecology Group. Public Service Company of Colorado as the licensee provides contract management and oversight of contractor functions. An aggressive program to maintain project radiation exposures As Low As Reasonably Achievable (ALARA) has been established, with the following program elements: temporary and permanent shielding contamination control; mockup training; engineering controls; worker awareness; integrated work package reviews communication; special instrumentation; video camera usage; robotics application; and project committees. To date, worker exposures have been less than project estimates. from the start of the project through Februrary of 1994, total exposure has been 98.666 person-rem, compared to the project estimate of 433 person-rem and goal of 347 person-rem. The presentation will discuss the site characterization efforts, the radiological performance indicator program, and the final site release survey plans.« less

  1. Physical Fitness Symposium, 12-14 October 1970, United States Army Infantry School, Fort Benning, Georgia

    DTIC Science & Technology

    1970-10-14

    Lcadersalp Department, USAIS Fort Uennlng, GA 43 rä^ajaaäaiafeaaaft-ai HAKE Bray, H. F., MAJ Ely the, Ronald , LIC Bussaan, Carl E ., LT Orroll...development of the Army physic*! fitness program. ^ JECTIVESl e objectives of the symposium were: I. To discuss new developments in physical...upon the body. c. Evaluation of physical fitness. d. Motivation in training and tcstinR. e . Running progrsa "RUN FOR YOUR LIFE." f. Contribution of

  2. A Study of the Courses, Programs and Facilities at the Okaloosa-Walton Junior College/University of West Florida Joint Center in Fort Walton Beach. Report and Recommendations of the Postsecondary Education Planning Commission, 1987. Report 9.

    ERIC Educational Resources Information Center

    Florida State Postsecondary Education Planning Commission, Tallahassee.

    In 1987, a task force was convened to determine the need for further expansion of the Okaloosa-Walton Junior College/University of West Florida (OWJC/UWF) Joint Center, and, if warranted, to select a permanent site for the facility. The task force undertook a study involving: (1) collection of demographic data on the Greater Fort Walton Beach area…

  3. Demonstrate Energy Component of the Installation Master Plan Using Net Zero Installation Virtual Testbed

    DTIC Science & Technology

    2015-09-01

    capabilities. Chapter 4 includes examples of their application and results. The tool has also been applied to EMP processes at Fort Leonard Wood , MO...such as solar photovoltaics, solar-thermal, wind energy, biomass ( wood chips, etc.), biogas, or synthetic gas need to be considered as part of the mix...this project Besides its use on pilot projects funded by ESTCP program, NZP is currently being used at Fort Leonard Wood , MO and several other

  4. Demonstration of the Energy Component of the Installation Master Plan Using the Net Zero Energy Planner Tool

    DTIC Science & Technology

    2015-09-01

    capabilities. Chapter 4 includes examples of their application and results. The tool has also been applied to EMP processes at Fort Leonard Wood , MO...such as solar photovoltaics, solar-thermal, wind energy, biomass ( wood chips, etc.), biogas, or synthetic gas need to be considered as part of the mix...this project Besides its use on pilot projects funded by ESTCP program, NZP is currently being used at Fort Leonard Wood , MO and several other

  5. Allocation and Apportionment of Funding Resources for Military Construction Within the U.S. Army Reserve

    DTIC Science & Technology

    2003-01-01

    greater deployment capabilities. The Stryker specific requirements program at Fort Lewis will be completed by the end of the calendar year 2003. This is...USAR and can be found in appendix B, for a complete list for all United States Army MILCON projects for the FYDP fiscal year 2004 through fiscal year...institution in one of its communities. 59 APPENDIX A ACTIVE ARMY FY 2004 --FY 2009 FYDP Funded Fiscal Year Installation Description MCA DD1391 2004 Fort

  6. DoD Survey of Officers and Enlisted Personnel: Survey Design and Administrative Procedures (1978).

    DTIC Science & Technology

    1980-04-01

    Fort Detrick Fort Devens Fort Dix Fort Drum Dugway Proving Ground Fort Eustis...Campbell Carlisle Barracks Fort Carson Defense Language Inst., Fgn Lang Cen Defense Personnel Support Center Fort Detrick Fort Devens Fort Dix Fort Drum...Personnel Support Center Fort Detrick Fort Devens Fort Dix Fort Drum Dugway Proving Ground Fort Eustis Fitzsimons Army Medical

  7. Performance and economic evaluation of the seahorse natural gas hot water heater conversion at Fort Stewart. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Winiarski, D.W.

    1995-12-01

    The Federal government is the largest single energy consumer in the United States with consumption of nearly 1.5 quads/year of energy (10{sup 15} quad = 1015 Btu) and cost valued at nearly $10 billion annually. The US Department of Energy`s (DOE) Federal Energy Management Program (FEMP) supports efforts to reduce energy use and associated expenses in the Federal sector. One such effort, the New Technology Demonstration Program (NTDP) seeks to evaluate new energy -- saving US technologies and secure their more timely adoption by the US government. Pacific Northwest Laboratory (PNL) is one of four DOE laboratories that participate inmore » the New Technologies Demonstration Program, providing technical expertise and equipment to evaluate new, energy-saving technologies being studied under that program. This report provides the results of a field evaluation that PNL conducted for DOE/FEMP with funding support from the US Department of Defense (DoD) Strategic Environmental Research and Development Program (SERDP) to examine the performance of 4 candidate energy-saving technology-a water heater conversion system to convert electrically powered water heaters to natural gas fuel. The unit was installed at a single residence at Fort Stewart, a US Army base in Georgia, and the performance was monitored under the NTDP. Participating in this effort under a Cooperative Research and Development Agreement (CRADA) were Gas Fired Products, developers of the technology; the Public Service Company of North Carolina; Atlanta Gas Light Company; the Army Corps of Engineers; Fort Stewart; and Pacific Northwest Laboratory.« less

  8. A Model for an Integrated Learning Community.

    ERIC Educational Resources Information Center

    Van Sickle, Shaila; Mehs, Doreen

    Fort Lewis College (Colorado) developed a 17 credit, multidisciplinary learning program for first-time freshmen. The Integrated Learning Program (ILP) meets several of the college's general education requirements, is issue-oriented, and is taught by a team of five faculty members. The goals of the program include getting students to learn how to…

  9. Applying PRECEDE-PROCEED to Develop an Intuitive Eating Nondieting Approach to Weight Management Pilot Program

    ERIC Educational Resources Information Center

    Cole, Renee E.; Horacek, Tanya

    2009-01-01

    Objective: To describe the use of a consolidated version of the PRECEDE-PROCEED participatory program planning model to collaboratively design an intuitive eating program with Fort Drum military spouses tailored to their readiness to reject the dieting mentality and make healthful lifestyle modifications. Design: A consolidated version of…

  10. Transportation and Travel: Travel Overseas

    DTIC Science & Technology

    1994-06-20

    FORT LEANORD WOOD OSCEOLA OFFUTT AFB NE FORT LEANORD WOOD PAGE OFFUTT AFB NE FORT LEANORD WOOD PALO OFFUTT AFB NE FORT LEANORD WOOD PLYMOUTH OFFUTT...goods—Continued COUNTY HHG ORDERS ADAIR FORT KNOX KY ALLEN FORT KNOX KY ANDERSON LEXINGTON BLUE GRASS ARMY DEPOT BALLARD FORT CAMPBELL KY BARREN FORT...MASSACHUSETTS FORT DEVENS MA PLYMOUTH JPPSO–MASSACHUSETTS FORT DEVENS MA SUFFOLK JPPSO–MASSACHUSETTS FORT DEVENS MA WORCESTER JPPSO–MASSACHUSETTS FORT DEVENS

  11. Easing the Transition from Preschool to Kindergarten.

    ERIC Educational Resources Information Center

    Waxler, Trellis; And Others

    1990-01-01

    Describes two Head Start projects designed to make the transition from preschool to kindergarten less stressful for Head Start children and their families. Programs are the Mille Lacs Reservation Head Start program in Minnesota and the East Coast Migrant Head Start project in Fort Pierce, Florida. Project evaluations are summarized. (BB)

  12. Inside a Nontraditional Jobs Exploration.

    ERIC Educational Resources Information Center

    Campbell, Elizabeth H.

    1979-01-01

    Describes a Vocational Exploration Program at the military base, Fort Lewis, in Tacoma, Washington, which provided opportunities for 20 young women to sample jobs formerly reserved for men. This program is sponsored jointly by the National Alliance of Business and the AFL-CIO and funded under the Comprehensive Employment and Training Act. (MF)

  13. Health behaviours of pregnant women in Fort McMurray, Alberta.

    PubMed

    Dow-Clarke, R A; MacCalder, L; Hessel, P A

    1994-01-01

    Baby. Vision was a survey of lifestyle behaviours of pregnant women in the Fort McMurray area, conducted between April and June 1989. The survey goal was to establish baseline data for coordinated health promotion programs for expectant parents. Questionnaires were completed by 173 pregnant women. Overall the women were well educated and in high-income households. Approximately one third of the women (36.6%) reported smoking during pregnancy. Most (90%) were exposed to second-hand smoke. Almost half (48.8%) stated they had consumed alcoholic beverages since learning of their pregnancy. Thirty percent were unaware of their immunization status. Most (98%) reported doing something to improve their health during this pregnancy, improved eating habits being most often mentioned. The results indicate that health promotion activities might improve the birth outcomes in Fort McMurray and outlying areas. The data may be relevant to other relatively remote areas in Canada.

  14. The Army Racial Awareness Program: A Case Study of Program Impact on Personal Values. Special Report

    ERIC Educational Resources Information Center

    Vaughan, Michael R.; Kriner, Richard E.

    The effects of two forms of presentation of the Army Racial Awareness Program (RAP) on the personal values of equality and freedom were assessed. Subjects were Army personnel assigned to RAP at Fort Meade, Md. The research instrument was the Rokeach Value Survey, in pretest-posttest administrations. Results suggested that the official RAP…

  15. Army Medical Research and Materiel Command Resident Research Associateship Program

    DTIC Science & Technology

    2017-05-01

    Award Number: W81XWH-12-2-0033 TITLE: Army Medical Research & Materiel Command Resident Research Associateship Program PRINCIPAL INVESTIGATOR...PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for Public...SUBTITLE NRC/AMRMC Resident Research Associateship Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER W81XWH-12-2-0033 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S

  16. PVAMU/XULA/BCM Summer Prostate Cancer Research Program

    DTIC Science & Technology

    2017-10-01

    AWARD NUMBER: W81XWH-15-1-0677 TITLE: PVAMU/XULA/BCM Summer Prostate Cancer Research Program PRINCIPAL INVESTIGATOR: Nancy L. Weigel...Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for Public Release; Distribution Unlimited...PVAMU/XULA/BCM Summer Prostate Cancer Research Program 5b. GRANT NUMBER W81XWH-15-1-0677 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Nancy L. Weigel

  17. Critical Difference and Biological Variation in Biomarkers of Oxidative Stress and Nutritional Status in Athletes

    PubMed Central

    Lewis, Nathan A.; Newell, John; Burden, Richard; Howatson, Glyn; Pedlar, Charles R.

    2016-01-01

    The longitudinal monitoring of oxidative stress (OS) in athletes may enable the identification of fatigued states and underperformance. The application of OS biomarker monitoring programs in sport are hindered by reliability and repeatability of in-the-field testing tools, the turnaround of results, and the understanding of biological variation (BV). Knowledge of BV and critical difference values (CDV) may assist with data interpretation in the individual athlete. Methods: We aimed firstly to assess the repeatability of the clinical point of care redox test, Free Oxygen Radical Test (FORT) and the Free Oxygen Radical Defence (FORD) in trained participants and elite athletes and secondly to calculate the analytical, BV, CDV and index of individuality (II) for FORT, FORD, red blood cell glutathione, lutein, α and γ–tocopherol. Part 1: Fifteen elite athletes were sampled in duplicate for calculation of the repeatability of the FORT and FORD tests. Part 2: Twelve well-trained athletes had venous samples drawn every 2 hours from 0800 to 1800 for calculation of BV, CDV, II for FORT, FORD, RBC GSH, lutein, α-tocopherol and γ–tocopherol. Results: Repeatability of the FORT and FORD assay was 3.9% and 3.7% respectively. Biomarker CDV ranged from 12.8% to 37%, with a circadian effect for FORT, α-tocopherol and γ-tocopherol (p<0.01), with all biomarker indices of individuality < 0.8 arbitrary units. Conclusion: We report that the use of the novel redox test in athletes is practical, and the generation of BV and CDV for biomarkers of OS enhances the interpretation of physiologically meaningful changes in individuals above the use of clinical reference ranges alone. PMID:26930475

  18. Critical Difference and Biological Variation in Biomarkers of Oxidative Stress and Nutritional Status in Athletes.

    PubMed

    Lewis, Nathan A; Newell, John; Burden, Richard; Howatson, Glyn; Pedlar, Charles R

    2016-01-01

    The longitudinal monitoring of oxidative stress (OS) in athletes may enable the identification of fatigued states and underperformance. The application of OS biomarker monitoring programs in sport are hindered by reliability and repeatability of in-the-field testing tools, the turnaround of results, and the understanding of biological variation (BV). Knowledge of BV and critical difference values (CDV) may assist with data interpretation in the individual athlete. We aimed firstly to assess the repeatability of the clinical point of care redox test, Free Oxygen Radical Test (FORT) and the Free Oxygen Radical Defence (FORD) in trained participants and elite athletes and secondly to calculate the analytical, BV, CDV and index of individuality (II) for FORT, FORD, red blood cell glutathione, lutein, α and γ-tocopherol. Part 1: Fifteen elite athletes were sampled in duplicate for calculation of the repeatability of the FORT and FORD tests. Part 2: Twelve well-trained athletes had venous samples drawn every 2 hours from 0800 to 1800 for calculation of BV, CDV, II for FORT, FORD, RBC GSH, lutein, α-tocopherol and γ-tocopherol. Repeatability of the FORT and FORD assay was 3.9% and 3.7% respectively. Biomarker CDV ranged from 12.8% to 37%, with a circadian effect for FORT, α-tocopherol and γ-tocopherol (p<0.01), with all biomarker indices of individuality < 0.8 arbitrary units. We report that the use of the novel redox test in athletes is practical, and the generation of BV and CDV for biomarkers of OS enhances the interpretation of physiologically meaningful changes in individuals above the use of clinical reference ranges alone.

  19. 32 CFR 240.6 - Retention program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... National Defense University (NDU) at Fort McNair in Washington, DC; and the Naval Postgraduate School (NPS... costs and required fees and books. All travel costs and necessary position back-fill for individuals...

  20. 32 CFR 240.6 - Retention program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... National Defense University (NDU) at Fort McNair in Washington, DC; and the Naval Postgraduate School (NPS... costs and required fees and books. All travel costs and necessary position back-fill for individuals...

  1. Mechanic/maintenance training and certification program.

    DOT National Transportation Integrated Search

    2017-04-01

    The Indiana Department of Transportation (INDOT) is divided into six districts, with district offices located in La Porte, Fort Wayne, : Crawfordsville, Greenfield, Vincennes, and Seymour. Each district includes multiple vehicle maintenance shops (to...

  2. Affordable Housing for Military Families: State/Federal Inducement Program

    DTIC Science & Technology

    1989-04-01

    2,676LA New Orleans 3,825 3,357 2,416 31,900 18 266LA Shreveport/Barksdale 6,283 5,338 3,250 30,400 122 566MA Fort Devens /Ayer 5,556 3,876 1,641 41,100 638...30,400 0 566 MA Fort Devens /Ayer 5,556 3,876 1,641 41,100 638 906 MA Hanscomb AFB 3,321 2,303 1,202 41,100 88 160 MD Aberdeen Proving Grounds* 4,541...Department of Defense. Abt Associates assumes all responsibility for the accuracy and completeness of the information contained in this report. EXECUTIVE

  3. Archaeological Survey at Fort Hood, Texas Fiscal Year 1987: The MCA range Construction, Pidcoke Land Exchange, and Phantom Range Projects. Archeological Resource Management Series Research Report Number 23

    DTIC Science & Technology

    1991-01-01

    ORGANIZATION NAME AND ADORES$ 10. PROGRAM ELEMENT. PROJECT. TASK AREA G WORK UNIT NUMBERS Archeological Research Laboratory Texas A&M University College Station...V’Avail and/or • G O8IRZ This report summarizes the results of an archeological survey conducted for the U.S. Army at Fort Hood, Texas, by personnel from...it forms numerous round-topped buttes and outliers where the Edwards cap is eroded away. Overly-,, g the Comanche Peak formation is the Edwards

  4. Installation Restoration Program. Preliminary Assessment: 185th Tactical Fighter Group, Iowa Air National Guard, Sioux Gateway Airport, Sergeant Bluff, Iowa and 133rd Tactical Control Flight, Iowa Air National Guard, Fort Dodge Municipal Airport, Fort Dodge, Iowa

    DTIC Science & Technology

    1988-12-01

    nuclear disintegration of certain elements and isotopes, with the emission of radiation, radiant energy capable of affecting living tissue. RADIUM - A...Corrosion Control. Waste oils, recovered fuels , spent cleaners, strippers, and solvents are * generated by these shops. ES-i mIs- Interviews with past...HAS-73) A defueling pit is located north of the old alert hangar (Building No. 241). Excess JP-4 fuel in the F-100 aircraft was dumped into the pit

  5. 77 FR 63316 - Privacy Act of 1974; Notice of New System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... City (Region 6) and Fort Worth (Region 7) as well as Cloud components as part of GSA's implementation... Management and Budget (OMB) when necessary to the review of private relief legislation pursuant to OMB... the application by the program office for their program requirements. SAFEGUARDS: Cloud systems are...

  6. 78 FR 35033 - Privacy Act of 1974; Notice of an Updated System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ...) and Fort Worth (Region 7) as well as Cloud components as part of GSA's implementation of Google Apps... Management and Budget (OMB) when necessary to the review of private relief legislation pursuant to OMB... configured in the application by the program office for their program requirements. SAFEGUARDS: Cloud systems...

  7. A Model for the Inclusion of a Physical Fitness and Health Promotion Component in a Chemical Abuse Treatment Program.

    ERIC Educational Resources Information Center

    Fridinger, Fred; Dehart, Beverly

    1993-01-01

    Describes treatment program at Charter Hospital in Fort Worth, Texas, which incorporates comprehensive medical examination, fitness and nutritional screenings, and appropriate exercise activities into alcohol and other substance abuse treatment. Notes that educational sessions are offered on health fitness, risk reduction, stress management,…

  8. Developmental assessment of the Fort St. Vrain version of the Composite HTGR Analysis Program (CHAP-2)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stroh, K.R.

    1980-01-01

    The Composite HTGR Analysis Program (CHAP) consists of a model-independent systems analysis mainframe named LASAN and model-dependent linked code modules, each representing a component, subsystem, or phenomenon of an HTGR plant. The Fort St. Vrain (FSV) version (CHAP-2) includes 21 coded modules that model the neutron kinetics and thermal response of the core; the thermal-hydraulics of the reactor primary coolant system, secondary steam supply system, and balance-of-plant; the actions of the control system and plant protection system; the response of the reactor building; and the relative hazard resulting from fuel particle failure. FSV steady-state and transient plant data are beingmore » used to partially verify the component modeling and dynamic smulation techniques used to predict plant response to postulated accident sequences.« less

  9. An Assessment of the Drug Abuse Resistance Education (DARE) Program in Fort Wayne, Indiana.

    ERIC Educational Resources Information Center

    Fife, Brian L.

    DARE is a preventive drug education program intended to combat drug use by students before it commences. The elementary school program is the core curriculum of DARE. It is designed to help those enrolled to develop skills that will allow them to resist the pressures to use substances such as illegal drugs, alcohol and tobacco. Students are taught…

  10. An Assessment of Previous Archaeological Surveys at Fort Campbell, Kentucky/Tennessee

    DTIC Science & Technology

    2006-04-01

    Krejsa Public Service Archaeology Program Department of Anthropology University of Illinois Urbana , IL 61801 Michael L. Hargrave Construction...ii Abstract: From September 2003 through June 2004 the Public Service Archaeology Program (PSAP) of the University of Illinois at Urbana ...of this work was done by Dr. Paul Krejsa, Public Service Archaeological Program, University of Illinois at Urbana - Champaign, under contract DACA42-00

  11. Sociological aspects of earthquake prediction

    USGS Publications Warehouse

    Spall, H.

    1979-01-01

    Henry Spall talked recently with Denis Mileti who is in the Department of Sociology, Colorado State University, Fort Collins, Colo. Dr. Mileti is a sociologst involved with research programs that study the socioeconomic impact of earthquake prediction. 

  12. 1995 Bicycle and Pedestrian Safety Report

    DOT National Transportation Integrated Search

    1995-03-01

    This report provides a review of the current data on bicycle and pedestrian : safety across the United States, finding that safety and education : programs could significantly improve bicycle and pedestrian safety in the : Dallas-Fort Worth Metropoli...

  13. Conversion of the CALAP (Computer Aided Landform Analysis Program) Program from FORTRAN to DUCK.

    DTIC Science & Technology

    1986-09-01

    J’ DUCK artificial intelligence logic programming 20 AVrACT (Cthm m reerse stabN ameeaaW idelfr by block mbae) An expert advisor program named CALAP...original program was developed in FORTRAN on an HP- 1000, a mirticomputer. CALAP was reprogrammed in an Artificial Intelligence (AI) language called DUCK...the Artificial Intelligence Center, U.S. Army Engineer Topographic Laboratory, Fort Belvoir. Z" I. S. n- Page 1 I. Introduction An expert advisor

  14. 40 CFR 80.215 - What is the scope of the geographic phase-in program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., Fort McDermitt, Goshute, Haulapai, Havasupai, Hopi, Kalispel, Navajo, Pine Ridge, Rosebud, Yakama, San... reservation land shall be considered fully within the GPA for purposes of this program. (b) Duration of the..., except as provided in paragraph (b)(2) of this section. (2) Subject to the provisions of § 80.540, the...

  15. 40 CFR 80.215 - What is the scope of the geographic phase-in program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., Fort McDermitt, Goshute, Haulapai, Havasupai, Hopi, Kalispel, Navajo, Pine Ridge, Rosebud, Yakama, San... reservation land shall be considered fully within the GPA for purposes of this program. (b) Duration of the..., except as provided in paragraph (b)(2) of this section. (2) Subject to the provisions of § 80.540, the...

  16. United States Air Force High School Apprenticeship Program. 1990 Program Management Report. Volume 2

    DTIC Science & Technology

    1991-04-18

    49-3 documentation application. The demonstration was created with Apple Computer’s HyperCard using a flowchart -like format with which the user could...Software, Inc.,1989. F-1_6 A/B Avionic System Manual. Fort Worth, TX: General Dynamics, 1990.I 5HyperCard Beginners Guide: An Introduction to

  17. PVAMU/XULA/BCM Summer Prostate Cancer Research Program

    DTIC Science & Technology

    2016-10-01

    2. KEYWORDS: HBCU, students, training, research , seminars 3. ACCOMPLISHMENTS Major goals and accomplishments Major Task 1 Advertising and...AWARD NUMBER: W81XWH-15-1-0677 TITLE: PVAMU/XULA/BCM Summer Prostate Cancer Research Program PRINCIPAL INVESTIGATOR: Nancy L. Weigel...Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for Public Release; Distribution Unlimited

  18. Development, Implementation, and Evaluation of Leadership/Management Training Within Army Battalions: Volume I: Summary of Findings.

    ERIC Educational Resources Information Center

    Fry, John P.; Cliborn, Robert E.

    The report describes the development and evaluation of an in-unit, leadership/management training program (based on experimental training methodology for providing Army leaders with behavioral skills and techniques) implemented within three battalion-sized combat units at Fort Bliss, Texas, in 1974. The program was organized around workshops…

  19. 76 FR 56493 - Notice of Delays in Processing of Special Permits Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    .... 14741-M Weatherford 4 10-31-2011 International, Fort Worth, TX. 8826-M Phoenix Air 4 10-31-2011 Group... Seattle, WA. 10656-M Conference of 4 11-30-2011 Radiation Control Program Directors, Inc., Frankfort, KY. 11406-M Conference of 4 11-30-2011 Radiation Control Program Directors, Inc., Frankfort, KY. 12629-M TEA...

  20. Process Optimization Assessment: Fort Leonard Wood, MO and Fort Carson, CO

    DTIC Science & Technology

    2003-11-01

    IUJ US Army Corps of Engineers, Engineer Research and Development Center Process Optimization Assessment Fort Leonard Wood, MO and Fort Carson, CO... Optimization Assessment: Fort Leonard Wood, MO and Fort Carson, CO Mike C.J. Lin and John Vavrin Construction Engineering Research Laboratory PO Box 9005...work performed a Process Optimization Assessment (POA) on behalf of Fort Leonard Wood, MO and Fort Carson, CO to identify process, energy, and

  1. Mississippi CaP HBCU Undergraduate Research Training Program

    DTIC Science & Technology

    2017-11-01

    AWARD NUMBER: W81XWH-14-1-0151 TITLE: Mississippi CaP HBCU Undergraduate Research Training Program PRINCIPAL INVESTIGATOR: Christian Gomez...Final PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for...2017 4. TITLE AND SUBTITLE Mississippi CaP HBCU Undergraduate Research Training Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER W81XWH-14-1-0151 5c

  2. NASA Runway Incursion Prevention System (RIPS) Dallas-Fort Worth Demonstration Performance Analysis

    NASA Technical Reports Server (NTRS)

    Cassell, Rick; Evers, Carl; Esche, Jeff; Sleep, Benjamin; Jones, Denise R. (Technical Monitor)

    2002-01-01

    NASA's Aviation Safety Program Synthetic Vision System project conducted a Runway Incursion Prevention System (RIPS) flight test at the Dallas-Fort Worth International Airport in October 2000. The RIPS research system includes advanced displays, airport surveillance system, data links, positioning system, and alerting algorithms to provide pilots with enhanced situational awareness, supplemental guidance cues, a real-time display of traffic information, and warnings of runway incursions. This report describes the aircraft and ground based runway incursion alerting systems and traffic positioning systems (Automatic Dependent Surveillance - Broadcast (ADS-B) and Traffic Information Service - Broadcast (TIS-B)). A performance analysis of these systems is also presented.

  3. Logistics Process Analysis ToolProcess Analysis Tool

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2008-03-31

    LPAT is the resulting integrated system between ANL-developed Enhanced Logistics Intra Theater Support Tool (ELIST) sponsored by SDDC-TEA and the Fort Future Virtual Installation Tool (sponsored by CERL). The Fort Future Simulation Engine was an application written in the ANL Repast Simphony framework and used as the basis for the process Anlysis Tool (PAT) which evolved into a stand=-along tool for detailed process analysis at a location. Combined with ELIST, an inter-installation logistics component was added to enable users to define large logistical agent-based models without having to program. PAT is the evolution of an ANL-developed software system called Fortmore » Future Virtual Installation Tool (sponsored by CERL). The Fort Future Simulation Engine was an application written in the ANL Repast Simphony framework and used as the basis for the Process Analysis Tool(PAT) which evolved into a stand-alone tool for detailed process analysis at a location (sponsored by the SDDC-TEA).« less

  4. The Canadian influenza decision, 1976.

    PubMed Central

    Morrison, A. B.; Liston, A. J.; Abbott, J. D.

    1976-01-01

    This paper explains the Canadian decision process following the isolation and identification of A/New Jersey/8/76 at Fort Dix, New Jersey in February 1976. The cause for concern was the emergence of a swine-like strain related to that which caused the 1918-19 pandemic, together with proved man-to-man transmission. This concern was reinforced since all new influenza A strains known to have infected the number of persons involved at Fort Dix have become strains of epidemic importance. The Fort Dix outbreak gave sufficient warning to allow implementation of a national vaccination program, to prevent and protect against influenza. In the past such an opportunity had not occurred, and vaccine use had, at best, constituted an intervention in the course of an outbreak. The National Advisory Committee on Immunizing Agents had all available information when it reached its decision to recommend vaccination with bivalent (A/Victoria and A/New Jersey) or with monovalent (A/New Jersey) vaccine for selective, high-risk groups. This was an independent, scientifically based decision. PMID:991022

  5. The Coast Artillery Journal. Volume 83, Number 1, January-February 1940

    DTIC Science & Technology

    1940-02-01

    Fulton Q. C. Gardner presented the medal to Private Evers at a review of the troops of the Harbor Defenses at Fort Kamehameha on December 15, 1939...55th Coast Artil- lery at Fort Kamehameha . Other new arrivals and assi?;fl- ments are Lieutenants B. S. Evans, Jr. (Fort Shafter)’, J. R. Gifford...Fort DeRussy), R. A. Janowski (Fon Kamehameha ), R. E. Jordan (Fort Ruger), L. A. Simon (Fort Ruger), H. Weiseman (Fort Ruger), and K. L Yarnall (Fort

  6. Land-Use Analysis and Simulated Effects of Land-Use Change and Aggregate Mining on Groundwater Flow in the South Platte River Valley, Brighton to Fort Lupton, Colorado

    USGS Publications Warehouse

    Arnold, L.R.; Mladinich, C.S.; Langer, W.H.; Daniels, J.S.

    2010-01-01

    Land use in the South Platte River valley between the cities of Brighton and Fort Lupton, Colo., is undergoing change as urban areas expand, and the extent of aggregate mining in the Brighton-Fort Lupton area is increasing as the demand for aggregate grows in response to urban development. To improve understanding of land-use change and the potential effects of land-use change and aggregate mining on groundwater flow, the U.S. Geological Survey, in cooperation with the cities of Brighton and Fort Lupton, analyzed socioeconomic and land-use trends and constructed a numerical groundwater flow model of the South Platte alluvial aquifer in the Brighton-Fort Lupton area. The numerical groundwater flow model was used to simulate (1) steady-state hydrologic effects of predicted land-use conditions in 2020 and 2040, (2) transient cumulative hydrologic effects of the potential extent of reclaimed aggregate pits in 2020 and 2040, (3) transient hydrologic effects of actively dewatered aggregate pits, and (4) effects of different hypothetical pit spacings and configurations on groundwater levels. The SLEUTH (Slope, Land cover, Exclusion, Urbanization, Transportation, and Hillshade) urban-growth modeling program was used to predict the extent of urban area in 2020 and 2040. Wetlands in the Brighton-Fort Lupton area were mapped as part of the study, and mapped wetland locations and areas of riparian herbaceous vegetation previously mapped by the Colorado Division of Wildlife were compared to simulation results to indicate areas where wetlands or riparian herbaceous vegetation might be affected by groundwater-level changes resulting from land-use change or aggregate mining. Analysis of land-use conditions in 1957, 1977, and 2000 indicated that the general distribution of irrigated land and non-irrigated land remained similar from 1957 to 2000, but both land uses decreased as urban area increased. Urban area increased about 165 percent from 1957 to 1977 and about 56 percent from 1977 to 2000 with most urban growth occurring east of Brighton and Fort Lupton and along major transportation corridors. Land-use conditions in 2020 and 2040 predicted by the SLEUTH modeling program indicated urban growth will continue to develop primarily east of Brighton and Fort Lupton and along major transportation routes, but substantial urban growth also is predicted south and west of Brighton. Steady-state simulations of the hydrologic effects of predicted land-use conditions in 2020 and 2040 indicated groundwater levels declined less than 2 feet relative to simulated groundwater levels in 2000. Groundwater levels declined most where irrigated land was converted to urban area and least where non-irrigated land was converted to urban area. Simulated groundwater-level declines resulting from land-use conditions in 2020 and 2040 are not predicted to substantially affect wetlands or riparian herbaceous vegetation in the study area because the declines are small and wetlands and riparian herbaceous vegetation generally are not located where simulated declines occur. See Report PDF for unabridged abstract.

  7. Human Factors Research in Aircrew Performance and Training

    DTIC Science & Technology

    1988-08-01

    Eisenhower Avenue, PROGRAM PROJECTA - 9Q TASK WORK UNITELEMENT NO. NO. A79. NO 236 ACCESSION NO Alexandria, VA 22333-5600 63731,6373 A793 132 11. TITLE...Fort RucKer, Alabama, is contributing to the effectiveness of Army aviation by con- ducting a comprehensive human factors research program in supporL...of aircrew perrorindnce and training. The ARIARDA research program encompasses the full scope of Army aviation with projects in support of (a) emerging

  8. Communicating Climate Change: Lessons Learned from a Researcher-Museum Collaboration †

    PubMed Central

    Parker, Christopher T.; Cockerham, Debbie; Foss, Ann W.

    2018-01-01

    The need for science education and outreach is great. However, despite the ever-growing body of available scientific information, facts are often misrepresented to or misunderstood by the general public. This can result in uninformed decisions that negatively impact society at both individual and community levels. One solution to this problem is to make scientific information more available to the public through outreach programs. Most outreach programs, however, focus on health initiatives, STEM programs, or young audiences exclusively. This article describes a collaboration between the Research and Learning Center at the Fort Worth Museum of Science and History and an interdisciplinary team of researchers from the Dallas–Fort Worth (DFW) metroplex area. The collaboration was a pilot effort of a science communication fellowship and was designed to train researchers to effectively convey current science information to the public with a focus on lifelong learning. We focus on the broader idea of a university-museum collaboration that bridges the science communication gap as we outline the process of forming this collaboration, lessons we learned from the process, and directions that can support future collaborations. PMID:29904536

  9. Elk Monitoring Protocol for Lewis and Clark National Historical Park, Version 1.0

    USGS Publications Warehouse

    Jenkins, Kurt J.; Griffin, Paul C.; Boetsch, John R.; Cole, Carla

    2011-01-01

    Maintaining elk (Cervus elaphus roosevelti) herds that frequent Lewis and Clark National Historical Park (NHP) is central to the park’s purpose of preserving the historic, cultural, scenic, and natural resources. Elk were critical to sustaining the members of the Lewis and Clark expedition by providing food and clothing over the winter of 1805-1806. Today, elk viewing opportunities in the park and surrounding region generate broad appeal with the visiting public, which number over 250,000 per year at the Fort Clatsop visitor center. This protocol describes procedures for monitoring trends in the use of the Fort Clatsop area by Roosevelt elk. Specific objectives of elk monitoring in Lewis and Clark NHP are to measure the relative use and proportion of area used by elk during winter in the Fort Clatsop Unit of the park, and the rate at which elk are sighted from roads in and around the park. Relative use and the proportion of area used by elk are determined from elk fecal pellet surveys conducted every other year in the Fort Clatsop park unit. Pairs of observers visit a systematic array of permanent plots in the fall to clear them of elk fecal pellets, and return to the plots in late winter to count elk fecal pellets that have accumulated during winter. Half of the subplots are counted by two independent observers, which allows for the estimation of relative use and proportion of area occupied by elk with analyses of detection biases that account for unseen elk pellet groups. Standardized road surveys are conducted in and near the Fort Clatsop park unit three or four times monthly during alternate months. Data from road surveys are used to quantify the rate that park visitors would be expected to see elk, when driving the selected set of routes. The monitoring protocol is based on three field seasons of development and testing. The protocol narrative describes the background, rationale, sampling design, field methods, analytical methods, data management, reporting, personnel requirements, and operational requirements for elk monitoring in Lewis and Clark NHP. The sampling design reflects tradeoffs between statistical and ecological considerations, safety, and current budget considerations. The protocol provides adequate power to detect a doubling or halving of elk use in the Fort Clatsop unit and surrounding areas within 15 years. Step-by-step guidance for planning and completing the monitoring tasks are in the attached standard operating procedures (SOPs). Information on the status and trends of elk use in Lewis and Clark NHP will allow park managers to assess the effects on elk of restoration programs within the park, build community partnerships, and identify potential linkages between regional land use changes and elk use of the Park. Lewis and Clark NHP has an active ecological restoration program that aims to recreate, where possible, ecological conditions that Lewis and Clark encountered. The restoration program includes an extensive exotic plant removal program, wetland restoration, and silvicultural treatments that will hasten development of late-seral conditions in recently acquired forest lands of the Fort Clatsop park unit. In the future, monitoring results can be used to test for spatial associations between ecological restoration treatments and relative use by elk. The park also plans to feature results from elk monitoring prominently in its educational outreach activities to help interpret the historical and current ecological context of the Lewis and Clark story, and engender public support for the park mission and management activities. Although NPS does not manage non-park lands, information about trends in the distribution of elk use will be valuable in public outreach and discussions with other partnering agencies and regional private landowners.

  10. SmartWay Featured Partner: North Central Texas Council of Governments

    EPA Pesticide Factsheets

    This EPA fact sheet spotlights North Central Texas Council of Governments as a SmartWay partner, improving air quality in the Dallas-Fort Worth region by incorporating SW-verified technology into its programs, reducing fuel consumption and increasing energ

  11. Model-Driven Energy Intelligence

    DTIC Science & Technology

    2015-03-01

    building information model ( BIM ) for operations...estimate of the potential impact on energy performance at Fort Jackson. 15. SUBJECT TERMS Building Information Modeling ( BIM ), Energy, ECMs, monitoring...dimensional AHU Air Handling Unit API Application Programming Interface BIM building information model BLCC Building Life Cycle Cost

  12. Implementing Base Realignment and Closure Decisions in Compliance with the National Environmental Policy Act

    DTIC Science & Technology

    1991-05-01

    February, 1991) Environmental Impact Statement Completion Date Fort Dix Jul 90 (A) Fort Devens - Fort Huachuca On Hold *Presidio of San Francisco May...the signing of the ROD in the NEPA process, documents must be revised, extending the environmental analysis process. As noted in the Fort Belvoir...91 Fort Sheridan Feb 91 (A) Fort Douglas Mar 91 Fort Meade Jul 91 Army Material Technology Laboratory Sep 91 Jefferson Proving Ground Sep 91 Cameron

  13. 75 FR 41922 - Notice of Intent To Rule on Request To Release Airport Property at Fort Smith Regional Airport...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ... To Release Airport Property at Fort Smith Regional Airport, Fort Smith, AR AGENCY: Federal Aviation... rule and invites public comment on the release of land at Fort Smith Regional Airport under the.... John Parker, Airport Director, Fort Smith Regional Airport, at the following address: Fort Smith...

  14. Maintenance Task Data Base for Buildings: Electrical Systems

    DTIC Science & Technology

    1991-05-01

    ton [.13 Fitchburg [.08 Springfie Id 1.08 Army Mtls & Mech Research Ctr 1.13 Fort Devens 1.15 Natick Research & Development Ctr [.L3 South Weymouth...Anniston Army Depot .8l Huntsville .88 Fort McClellan .80 Redstone Arsenal .88 Fort Rucker .80 Alaska State Average 2.25 Anchorage L.92 Delta Junction...3.73 Fort Greely 2.70 Fort Richardson L.92 Fort Wainwright 2.13 Arizona State Average 1.02 Flagstaff [.02 Phoenix .99 Tucson L.05 Fort Huachuca 1.22

  15. A Study to Determine the Feasibility of Establishing a Same-Day Surgery Program at General Leonard Wood Army Community Hospital, Fort Leonard Wood, Missouri

    DTIC Science & Technology

    1989-05-23

    1 20 m ;74 G.I. HEMORRHAGE AGE >69 AND/OR C. C. 2 18 L75 G.I. HEMORRHAGE AGE ា W/O C. C. 1 11 L76 COMPLICATED PEPTIC ULCER 1 13 m L77 UNCOMPLICATED... PEPTIC ULCER >69 AND/OR C. C. 1 19 L78 UNCOMPLICATED PEPTIC ULCER ា W/O C. C. 1 8 179 INFLAMMATORY BOWEL DISEASE 1 21 L80 G.I. OBSTRUCTION AGE >69...HOSPITAL, oC FORT LEONARD WOOD, MISSOURI 0m 0 z M z r.mz A Graduate Management Project z Submitted to the Faculty of Baylor University In Partial

  16. 23. Historic American Buildings Survey. 'Fort Independence,' 1801, by John ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Historic American Buildings Survey. 'Fort Independence,' 1801, by John Foncin. French artillerist and military engineer and designer of Fort McHenry. This plan includes alternate arrangements for grouping of the inner buildings 'Fig. 2' being similar to Fort McHenry. - Fort McHenry National Monument & Historic Shrine, East Fort Avenue at Whetstone Point, Baltimore, Independent City, MD

  17. 76 FR 62301 - Safety Zone; Rotary Club of Fort Lauderdale New River Raft Race, New River, Fort Lauderdale, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-07

    ...-AA00 Safety Zone; Rotary Club of Fort Lauderdale New River Raft Race, New River, Fort Lauderdale, FL... Fort Lauderdale, Florida during the Rotary Club of Fort Lauderdale New River Raft Race. The race is... safety of race participants, participant vessels, spectators, and the general public during the 550 yard...

  18. Photographic copy of U.S. Army Corps of Engineers, Fort Worth, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of U.S. Army Corps of Engineers, Fort Worth, Texas, drawing (original located at Fort Hood, Texas), 1989 Site plan of North Fort Hood - Fort Hood, World War II Temporary Buildings, Killeen, Bell County, TX

  19. Photographic copy of U.S. Army Corps of Engineers, Fort Worth, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of U.S. Army Corps of Engineers, Fort Worth, Texas, drawing (original located at Fort Hood, Texas), 1989 Site plan of South Fort Hood - Fort Hood, World War II Temporary Buildings, Killeen, Bell County, TX

  20. Site inspection addendum. Fort Meade feasibility study and remedial investigation/site inspection Fort George G. Meade, Maryland. Revision 1. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-12-01

    This Site Inspection Addendum Report has been prepared to address the Site Inspection portion of the Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI) activities at Fort George G. Meade. It has been prepared under Delivery Order No. 009 and a Change Order dated July 15, 1993, for the U.S. Army Environmental Center (USAEC), formerly known as the U.S. Army Toxic and Hazardous Materials Agency (USATHAMA). This report fulfills the requirements of deliverable ELIN A004 under Delivery Order 0009 of the Total Environmental Program Support (TEPS) contract DAAAl5-91-D-00l6. The purpose of this Site Inspection Addendum (SIA) report is to reportmore » the findings of Arthur D. Little`s SIA investigation. The overall purpose of an SI is to evaluate if chemical releases or potential contamination has occurred at suspected sites and to determine if further investigation is warranted. This study is an addendum to a previous SI and addresses data gaps remaining from or identified in that document. Six sites at Fort George G. Meade (FGGM) are included in the SIA: DPDO Salvage Yard and Transform Storage Area; DPDO Salvage Yard and Transformer Storage Area; Fire Training Area; Helicopter Hangar Area; Inactive Landfill No. 2, Ordnance Demolition Area Soldiers Lake.« less

  1. Manpower Requirements Report for FY 1975

    DTIC Science & Technology

    1974-02-01

    and dis - advantaged youth, such as: Stay-in- School Campaign, Temporary Summer Aid Program, Federal Junior Fellowship Program and Worker...are provided for school support and are not included in this table showing the composition of Land Forces; manpower for these units is in the Central...Carolina; the School of the Americas at Fort Gulick, Canal Zone; the MACTHAI Training and Development Detachment at Udorn; and the Technical

  2. Publications - IC 46 | Alaska Division of Geological & Geophysical Surveys

    Science.gov Websites

    Mapping Advisory Board STATEMAP Publications Geophysics Program Information Geophysical Survey ; Aeromagnetic; Aeromagnetic Survey; Airborne Geophysical Survey; Antimony; Arsenic; Arsenopyrite; Base Metals ; Electromagnetic Data; Electromagnetic Survey; Exploration; Fairbanks Mining District; Fort Knox Mine; Fortymile

  3. Request for proposal for an external travel survey in the Dallas-Fort Worth metropolitan area

    DOT National Transportation Integrated Search

    1993-11-01

    The North Central Texas Council of Governments (NCTCOG) is requesting written proposals from consultants to accomplish an external travel survey during the spring of 1994. In conjunction with major workplace, household, and transit surveys programmed...

  4. Fort Pickens and the Outbreak of the Civil War. Teaching with Historic Places.

    ERIC Educational Resources Information Center

    Folker, Ann Marie

    One of the largest brick forts built in the United States, Fort Pickens (along with nearby Fort McRee, Fort Barrancas, and Advanced Redoubt) provided the setting for a serious effort by a small group of men to avert or at least postpone the outbreak of the Civil War. Months before the firing on Fort Sumter, southern forces at nearby Pensacola…

  5. 78 FR 21239 - Standard Instrument Approach Procedures, and Takeoff Minimums and Obstacle Departure Procedures...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ..., RNAV (GPS) RWY 35, Orig Childress, TX, Childress Muni, RNAV (GPS) RWY 36, Amdt 1 Dallas-Fort Worth, TX, Dallas/Fort Worth Intl, CONVERGING ILS RWY 13R, Amdt 7 Dallas-Fort Worth, TX, Dallas/Fort Worth Intl, CONVERGING ILS RWY 17R, Amdt 9 Dallas-Fort Worth, TX, Dallas/Fort Worth Intl, CONVERGING ILS RWY 18L, Amdt 2...

  6. Fort Douglas, Stilwell Field, The portion of Fort Douglas bounded ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Fort Douglas, Stilwell Field, The portion of Fort Douglas bounded by De Trobriand Street on the north, Fort Douglas Boulevard on the east, Potter Street on the south, and Chase Street on the west. , Salt Lake City, Salt Lake County, UT

  7. Stabilization of the Solvent Methyl-n-Amyl Ketone (MAK) in Vinyl Paints.

    DTIC Science & Technology

    1983-06-01

    Europe 09757 Fort Carson 913 Chanute FS. IL 6188 Huntsville 35807 Fort Devens 01433 3345 CES/D. Stop 27 Lower MA SssSippi valley 39180 Fort O,’lb 13801...7th Army Training Comand 09114 Fort SherldA 60031 western Division 64066 87TN1: [TG-DEM 15) Fort Stewart 31313 ATTN Sr. Tnch. rAC -031 27332 40, 7tl...80903 ATTN: Facilities Engineer ATTN: OAEN- RR Fort Belvoir 22060 AITTN- 0AE-RCC Area Engineer ALDC-Area Office Fort Benning 3190S ATTN: DAEN-DM

  8. An employee assistance program for caregiver support.

    PubMed

    Mains, Douglas A; Fairchild, Thomas J; René, Antonio A

    2006-01-01

    The Comprehensive Caregiver Choices Program provided support for employee caregivers of elderly people for employees at a hospital in Fort Worth, Texas. Key informant interviews and focus groups provided direction for program development and implementation. A full-time MSW and professionals with expertise in gerontology/geriatrics provided education and care coordination services to caregivers. Approximately 4% of the hospital's workforce participated in the program. Attendees evaluated educational sessions and follow-up interviews were conducted with program participants. Caregiver support programs must continue to seek innovative and creative marketing and service delivery methods to reach out and assist working caregivers in need of support.

  9. An Analysis of Public/Private Ventures for the Construction of Military Family Housing

    DTIC Science & Technology

    1990-12-01

    Fort Hood 300 Completed Army Fort Polk 300 Completed 300 Completed Army Fort 400 Completed Wainwright 150 Completed Army Fort Drum...1,000 Completed 400 Completed 300 Completed Army Fort Bliss 300 Under construction Army. Fort McCoy 90 Awarded Navy Norfolk 300 Completed Navy Earle...their dependents at least expense to the government? [Primary] 2. When is it appropriate to completely privatize

  10. 34. Site Plan: Fort Custer Air Force Station, Fort Custer, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Site Plan: Fort Custer Air Force Station, Fort Custer, Michigan, Modification of Electrical Distribution, General Site Plan, USACOE, no date. - Fort Custer Military Reservation, P-67 Radar Station, .25 mile north of Dickman Road, east of Clark Road, Battle Creek, Calhoun County, MI

  11. Assessment of conservation practices in the Fort Cobb Reservoir watershed, southwestern Oklahoma

    USGS Publications Warehouse

    Becker, Carol J.

    2011-01-01

    The Fort Cobb Reservoir watershed encompasses about 813 square kilometers of rural farm land in Caddo, Custer, and Washita Counties in southwestern Oklahoma. The Fort Cobb Reservoir and six stream segments were identified on the Oklahoma 1998 303(d) list as not supporting designated beneficial uses because of impairment by nutrients, suspended solids, sedimentation, pesticides, and unknown toxicity. As a result, State and Federal agencies, in collaboration with conservation districts and landowners, started conservation efforts in 2001 to decrease erosion and transport of sediments and nutrients to the reservoir and improve water quality in tributaries. The U.S. Department of Agriculture selected the Fort Cobb Reservoir watershed in 2003 as 1 of 14 benchmark watersheds under the Conservation Effectiveness Assessment Project with the objective of quantifying the environmental benefits derived from agricultural conservation programs in reducing inflows of sediments and phosphorus to the reservoir. In November 2004, the Biologic, Geographic, Geologic, and Water Disciplines of the U.S. Geological Survey, in collaboration with the Agricultural Research Service, Grazinglands Research Laboratory in El Reno, Oklahoma, began an interdisciplinary investigation to produce an integrated publication to complement this program. This publication is a compilation of 10 report chapters describing land uses, soils, geology, climate, and water quality in streams and the reservoir through results of field and remote sensing investigations from 2004 to 2007. The investigations indicated that targeting best-management practices to small intermittent streams draining to the reservoir and to the Cobb Creek subwatershed may effectively augment efforts to improve eutrophic to hypereutrophic conditions that continue to affect the reservoir. The three major streams flowing into the reservoir contribute nutrients causing eutrophication, but minor streams draining cultivated fields near the reservoir appeared to be disproportionate contributors of nutrients. Increasing conservation practices on small streams may have a greater effect in mitigating eutrophication in the reservoir than additional installation of such measures on the larger creeks.

  12. Military Bases: Opportunities Exist to Improve Future Base Realignment and Closure Rounds

    DTIC Science & Technology

    2013-03-01

    Operational Army—realigns Fort Bliss , TX; Fort Hood, TX; Fort Riley, KS; Fort Campbell, KY; and Fort Sill, OK to include rebasing of units from overseas to...Committee on Appropriations United States Senate The Honorable Tim Johnson Chairman The Honorable Mark Kirk Ranking Member Subcommittee on Military

  13. Community Environmental Response Facilitation Act (CERFA) Report. Fort Devens Facility, Fort Devens, Massachusetts

    DTIC Science & Technology

    1994-04-01

    REMEDIAL DESIGN REMOVAL INVESTIGATION LATEST TECH ASSIST LATEST REMOVAL ACTION CERCLIS SITE SEARCH ID: 3 MAP ID : 3 NAME : FORT DEVENS REV DATE 05-21...34 ABB Environmental Services, Inc., June 1993. Draft Focused Feasibility Study Report, Data Item A009, Fort Devens , Focused Feasibility Study, AOCs 44...surrounding Fort Devens ; specific and remediation activity at information for surrounding properties Fort Devens can be found in Section 4.3.

  14. POLLUTION PREVENTION OPPORTUNITY ASSESSMENT HISTOLOGY LABORATORY XYLENE USE - FORT CARSON, COLORADO

    EPA Science Inventory

    Under the WREAFS program, RREL has performed a waste minimization opportunity assessment (WMOA) at the Evans Community Hospital Histopathology Laboratory on the Ft. Carson Army Base, Colorado, in the area of waste xylene and ethyl alcohol contaminated with human tissue. The waste...

  15. SUNREL Publications | Buildings | NREL

    Science.gov Websites

    Energy Simulation with a Three-Dimensional Ground-Coupled Heat Transfer Model Infiltration and Natural Ventilation Model for Whole-Building Energy Simulation of Residential Buildings Improvements to the SERIRES /SUNREL Building Energy Simulation Program, Deru, M. 1996. Masters Thesis, Colorado State University, Fort

  16. Hurricanes and anchors: preliminary results from the National Park Service regional reef assessment program

    USGS Publications Warehouse

    Rogers, Caroline S.

    1994-01-01

    The U .S . National Park Service NPS began a Regional Assessment Program for coral reefs in the U.S. Virgin Islands and Florida in 1988. Scientists from NPS and six other institutions have now established longterm monitoring sites at Virgin Islands National Park St. John, USVI, Buck Island Reef National Monument St. Croix, USVI, Biscayne National Park Florida and Fort Jefferson National Monument Florida. Hurricane Hugo passed through the USVI in 1989, causing severe destruction in some reef areas while leaving others untouched. Patchy damage to reefs in Florida was also noted after Hurricane Andrew; damage from this August 1992 storm is still being assessed. Fort Jefferson National Monument escaped the onslaught of Andrew. No significant recovery in live coral cover has been evident at the Buck Island or Virgin Islands National Park VINP study sites 3.5 years after Hurricane Hugo. Similarly, no recovery was evident at another site in St. John which was destroyed by a large anchor 4.5 years ago.

  17. The Role of Leadership in Navy Program Offices. Executive Summary

    DTIC Science & Technology

    1973-05-01

    PROGRAM MANAGEMENT COURSE- SSTUDENT STUDY PROGRAM Fort Beivoir, Virginia, 22060 THE ROLE OF LEADERSHIP IN NAVY PROGRAM OFFICES STUDY REPORT PMC 73-1...jLa I1 • 1. Men at the Top. Osborne kLliott 1 2. "Understanding Leadership ". W. 0. H. Prentice, HBR Sep- Oct 1966 j 3. "A Theory of Human Motivation...Drucker, IMI reprint 9. Technical Management Institute Thifnkpiece, " Leadership " 1 • 0. "The Effective Manager ". Peter Drucker, LMI r~print 11. Sur-ival In

  18. Lower Mississippi River Environmental Program. Report 13. Preliminary Environmental Design Considerations Associated with Articulated Concrete Mattress Revetments along the Lower Mississippi River

    DTIC Science & Technology

    1988-05-01

    Engineer Water Resources Support Center, Fort Belvoir, Va. Conner, J. W., Pennington, C. H., and Bosley, T. R. 1983. "Larval Fish of Selected Aquatic ...Mississippi River Environmental Program; Report 13 6a NAME OF PERFORMING ORGANIZATION 6b OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION Aquatic Ecosystem...Jenkins, Aquatic Ecosystem Analysts, PO Box 4188, Fayetteville, Ark. Mr. Stephen P. Cobb, MRC, Vicksburg, Miss., was the project officer and program manager

  19. Comprehensive Inventory and Determinations of Eligibility for Fort Riley Buildings: 1857-1963

    DTIC Science & Technology

    2009-09-01

    it was announced that, effective 20 July 1946, the Army Reception centers at Fort Leavenworth, Kansas, and Fort Snelling, Minne- sota, were being...transferred to Fort Riley.129 The new reception center was 126 “Recalls Days at Fort...Leavenworth and Fort Snelling Reception Centers To Be Moved Here,” Junc- tion City Union, 28 July 1946, 1. ERDC/CERL MP-09-1 57 able to handle 2,000–2,500

  20. Fort Irwin integrated resource assessment. Volume 3: Sitewide Energy Project identification for buildings and facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keller, J.M.; Dittmer, A.L.; Elliott, D.B.

    1995-02-01

    The U.S. Army Forces Command (FORSCOM) has tasked the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Irwin. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Irwin facility located near Barstow, California. It is a companion report to Volume 1, Executive Summary, and Volume 2,more » Baseline Detail. The results of the analyses of EROs are presented in 16 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis indicating the net present valve (NPV) and savings-to-investment ratio (SIR) of each ERO.« less

  1. 1. PHOTOGRAPHIC COPY OF MAP OF FORT BLISS DATED JUNE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. PHOTOGRAPHIC COPY OF MAP OF FORT BLISS DATED JUNE 15, 1934, REVISED TO JUNE 1, 1940, DRAWING No. FB-DWG-434, ORIGINAL ON FILE IN DIRECTORATE OF FACILITIES ENGINEERING, FORT BLISS - Fort Bliss, 7th Cavalry Buildings, U.S. Army Air Defence Artillery Center & Fort Bliss, El Paso, El Paso County, TX

  2. 8. PHOTOGRAPHIC COPY OF AERIAL PHOTOGRAPH, DATED CA. 19201925, FORT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. PHOTOGRAPHIC COPY OF AERIAL PHOTOGRAPH, DATED CA. 1920-1925, FORT BLISS, ARROW POINTS TO 7TH CAVALRY CANTONMENT, COPY ON FILE IN THE ENVIRONMENTAL MANAGEMENT OFFICE, FORT BLISS - Fort Bliss, 7th Cavalry Buildings, U.S. Army Air Defence Artillery Center & Fort Bliss, El Paso, El Paso County, TX

  3. ACHP | Fort Monroe Agreement Signed

    Science.gov Websites

    Search skip specific nav links Home arrow News arrow Fort Monroe Agreement Signed Fort Monroe Agreement Signed A historic agreement has been reached on a richly historic property, Fort Monroe, Virginia. Fort Programmatic Agreement (PA) that capped a lengthy and complex Section 106 consultation process led by the

  4. Hazardous Waste Cleanup: HQ 10th MTN Division & Fort Drum in Fort Drum, New York

    EPA Pesticide Factsheets

    HQ 10th MTN Division & Fort Drum facility is located at Jones Street and Off North Memorial Drive, in Fort Drum, in the northern portion of New York State approximately 10 miles northeast of Watertown. Fort Drum is the largest Army installation in the nort

  5. Abstracts of ARI Research Publications FY 1983

    DTIC Science & Technology

    1983-10-01

    and the relationship between SM usage and the soldier’s ability to perform his or her job skills , as measured by 2 SQT scores. Questionnaire data were...System (ACES) on soldier performance. Four -’ ACES programs were selected for evaluation: Basic Skills Education Program I, Literacy Phase (BSEP I...the prototype system was operated at Fort Carson, CO, the relationships among maintenance workload, efficiency, and skill were studied. As workload

  6. Land-Cover and Imperviousness Data for Regional Areas near Denver, Colorado; Dallas-Fort Worth, Texas; and Milwaukee-Green Bay, Wisconsin - 2001

    USGS Publications Warehouse

    Falcone, James A.; Pearson, Daniel K.

    2006-01-01

    This report describes the processing and results of land-cover and impervious surface derivation for parts of three metropolitan areas being studied as part of the U.S. Geological Survey's (USGS) National Water-Quality Assessment (NAWQA) Program Effects of Urbanization on Stream Ecosystems (EUSE). The data were derived primarily from Landsat-7 Enhanced Thematic Mapper Plus (ETM+) satellite imagery from the period 1999-2002, and are provided as 30-meter resolution raster datasets. Data were produced to a standard consistent with data being produced as part of the USGS National Land Cover Database 2001 (NLCD01) Program, and were derived in cooperation with, and assistance from, NLCD01 personnel. The data were intended as surrogates for NLCD01 data because of the EUSE Program's time-critical need for updated land-cover for parts of the United States that would not be available in time from the NLCD01 Program. Six datasets are described in this report: separate land-cover (15-class categorical data) and imperviousness (0-100 percent continuous data) raster datasets for parts of the general Denver, Colorado area (South Platte River Basin), Dallas-Fort Worth, Texas area (Trinity River Basin), and Milwaukee-Green Bay, Wisconsin area (Western Lake Michigan Drainages).

  7. Military Manpower Training Report for FY 1983.

    DTIC Science & Technology

    1982-03-01

    Fort Devens , MA 1,023 781 110 Fort Dix, NJ 133 22 0 Fort Eustis, VA 1,910 749 211 Fort Gordon, GA 7,791 2,199 805 Fort Huachuca, AZ 1,140 504 139...career personnel to keep pace with new equipment acquisition and modifications to the existing inventory will conti nue into the foresevable future and...Army Command and General Fort leavenworth, Staff College KA 40 College of Naval Command and Staff Newport, R 44 Marine Corps Command and Staff Col lege

  8. DoD Civilian Training: Source, Content, Frequency and Cost

    DTIC Science & Technology

    1994-03-01

    Intelligence School Charleston, SC, and the Fire School will move to Fort Huachuca, AZ, from portion of the Naval Technical Training Fort Devens , MA...Recruiting & Retention School 2 10 Fort Bliss, TX Air Defense Artillery 2 I 11 Fort Devens , MA Army Intelligence School 4 12 Fort Eustis, VA Aviation...17457 4385 Gigllng Road- 8th Floor , Fort Ord, CA 93941-5800 94 6 8 07A’ The Assistant Secretary of Defense for Personnel and Readiness issued a tasker

  9. Project Paiute

    ERIC Educational Resources Information Center

    Dearmin, Evalyn Titus

    1977-01-01

    Working with the Humboldt County School District, the Fort McDermitt Indian Education Committee, and four Paiute Teacher aides, the University of Nevada developed a three-component project: a bilingual/bicultural reading text for K-4 Paiutes; an in-service training program in Native American education; and a pilot bilingual curriculum. (JC)

  10. Reducing Waste from Military Facility Programs...Shed Those Ugly Tons

    DTIC Science & Technology

    2011-05-01

    USACE guidance 5 BUILDING STRONG® Sustainability Drivers • Net Zero Waste – Assistant Secretary of the Army for Installations, Energy and Environment...Garrison Grafenwoehr, Germany.  Fort Bliss and Carson (energy, water, waste)  “A net zero waste installation is an installation that reduces

  11. Teacher Preparation for Mainstreaming: Small College Case Study.

    ERIC Educational Resources Information Center

    Young, Pamela R.

    A project at Fort Lewis College (Durango, Colorado) was designed to reconceptualize elementary and secondary teacher preparation programs by infusing special education content so graduates would be prepared to provide instruction for individual differences mandated by mainstreaming legislation. In Phase I, curriculum was developed based on…

  12. 15. PERSPECTIVE VIEW (NORTHWEST) OF WEST RETAINING WALL IN SOUTHWEST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. PERSPECTIVE VIEW (NORTHWEST) OF WEST RETAINING WALL IN SOUTHWEST DEMI-BASTION SHOWING GLACIS - Fort Washington, Fort, 13551 Fort Washington Road, Fort Washington Forest, Prince George's County, MD

  13. 2. PERSPECTIVE VIEW (NORTH) INTO ESPLANADE OF NORTHWEST DEMIBASTION SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. PERSPECTIVE VIEW (NORTH) INTO ESPLANADE OF NORTHWEST DEMI-BASTION SHOWING REVETMENTS, COUNTERFORTS, GLACIS AND STAIRS - Fort Washington, Fort, 13551 Fort Washington Road, Fort Washington Forest, Prince George's County, MD

  14. 3. PERSPECTIVE VIEW (SOUTH) INTO ESPLANADE OF NORTHWEST DEMIBASTION SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. PERSPECTIVE VIEW (SOUTH) INTO ESPLANADE OF NORTHWEST DEMI-BASTION SHOWING REVETMENTS, COUNTERFORTS, GLACIS AND STAIRS - Fort Washington, Fort, 13551 Fort Washington Road, Fort Washington Forest, Prince George's County, MD

  15. 14. PERSPECTIVE VIEW (NORTH) INTO ESPLANADE OF SOUTHWEST DEMIBASTION SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. PERSPECTIVE VIEW (NORTH) INTO ESPLANADE OF SOUTHWEST DEMI-BASTION SHOWING REVETMENTS, RESTORED DOORS, GLACIS AND STAIRS - Fort Washington, Fort, 13551 Fort Washington Road, Fort Washington Forest, Prince George's County, MD

  16. 1. PERSPECTIVE VIEW (NORTHEAST) FROM ESPLANADE OF NORTHWEST DEMIBASTION SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. PERSPECTIVE VIEW (NORTHEAST) FROM ESPLANADE OF NORTHWEST DEMI-BASTION SHOWING GLACIS AND RELATIONSHIP TO MAIN GATE - Fort Washington, Fort, 13551 Fort Washington Road, Fort Washington Forest, Prince George's County, MD

  17. 33 CFR 334.855 - Salt River, Rolling Fork River, Otter Creek; U.S. Army Garrison, Fort Knox Military Reservation...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., Otter Creek; U.S. Army Garrison, Fort Knox Military Reservation; Fort Knox, Kentucky; danger zone. 334..., DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.855 Salt River, Rolling Fork River, Otter Creek; U.S. Army Garrison, Fort Knox Military Reservation; Fort Knox, Kentucky; danger zone. (a...

  18. 33 CFR 334.855 - Salt River, Rolling Fork River, Otter Creek; U.S. Army Garrison, Fort Knox Military Reservation...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., Otter Creek; U.S. Army Garrison, Fort Knox Military Reservation; Fort Knox, Kentucky; danger zone. 334..., DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.855 Salt River, Rolling Fork River, Otter Creek; U.S. Army Garrison, Fort Knox Military Reservation; Fort Knox, Kentucky; danger zone. (a...

  19. 33 CFR 334.855 - Salt River, Rolling Fork River, Otter Creek; U.S. Army Garrison, Fort Knox Military Reservation...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., Otter Creek; U.S. Army Garrison, Fort Knox Military Reservation; Fort Knox, Kentucky; danger zone. 334..., DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.855 Salt River, Rolling Fork River, Otter Creek; U.S. Army Garrison, Fort Knox Military Reservation; Fort Knox, Kentucky; danger zone. (a...

  20. 33 CFR 334.855 - Salt River, Rolling Fork River, Otter Creek; U.S. Army Garrison, Fort Knox Military Reservation...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., Otter Creek; U.S. Army Garrison, Fort Knox Military Reservation; Fort Knox, Kentucky; danger zone. 334..., DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.855 Salt River, Rolling Fork River, Otter Creek; U.S. Army Garrison, Fort Knox Military Reservation; Fort Knox, Kentucky; danger zone. (a...

  1. 33 CFR 334.855 - Salt River, Rolling Fork River, Otter Creek; U.S. Army Garrison, Fort Knox Military Reservation...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., Otter Creek; U.S. Army Garrison, Fort Knox Military Reservation; Fort Knox, Kentucky; danger zone. 334..., DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.855 Salt River, Rolling Fork River, Otter Creek; U.S. Army Garrison, Fort Knox Military Reservation; Fort Knox, Kentucky; danger zone. (a...

  2. 16. PERSPECTIVE VIEW (NORTHEAST) OF WEST TERREPLEIN OF SOUTHWEST DEMIBASTION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. PERSPECTIVE VIEW (NORTHEAST) OF WEST TERREPLEIN OF SOUTHWEST DEMI-BASTION SHOWING RELATIONSHIP TO MAIN GATE AND OFFICERS' QUARTERS - Fort Washington, Fort, 13551 Fort Washington Road, Fort Washington Forest, Prince George's County, MD

  3. 7. PERSPECTIVE VIEW (EAST) OF NORTH TERREPLEIN OF NORTHWEST DEMIBASTION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. PERSPECTIVE VIEW (EAST) OF NORTH TERREPLEIN OF NORTHWEST DEMI-BASTION SHOWING GUN MOUNTS AND RELATIONSHIP TO MAIN GATE - Fort Washington, Fort, 13551 Fort Washington Road, Fort Washington Forest, Prince George's County, MD

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oldham, D.W.

    Commercial quantities of gas have been produced from shallow sandstone reservoirs of the Fort Union Formation (Paleocene) in the Powder River Basin of Wyoming. The two largest accumulations discovered to date, Oedekoven and Chan pools, were drilled on prospects which invoked differential compaction as a mechanism for gas entrapment and prospect delineation. Gas is believed to have accumulated in localized structural highs early in the burial history of lenticular sands. Structural relief is due to the compaction contrast between sand and stratigraphically-equivalent fine-grained sediments. A shallow Fort Union gas play was based on reports of shallow gas shows, the occurrencemore » of thick coals which could have served as sources for bacterial gas, and the presence of lenticular sandstones which may have promoted the development of compaction structures early in the burial process, to which bacterial gas migrated. Five geologic elements related to compactional trap development were used to rank prospects. Drilling of the Oedekoven prospect, which possessed all prospect elements, led to the discovery of the Oedekoven Fort Union gas pool at a depth of 340 ft (104 m). The uncemented, very fine grained, well-sorted {open_quotes}Canyon sand{close_quotes} pay has extremely high intergranular porosity. Low drilling and completion costs associated with shallow, high-permeability reservoirs, an abundance of subsurface control with which to delineate prospects, and existing gas-gathering systems make Fort Union sandstones attractive primary targets in shallow exploration efforts as well as secondary objectives in deeper drilling programs.« less

  5. Inventory of Forts in Indonesia

    NASA Astrophysics Data System (ADS)

    Rinandi, N.; Suryaningsih, F.

    2015-08-01

    The great archipelago in Indonesia with its wealthy and various nature, the products and commodities of tropic agriculture and the rich soil, was through the centuries a region of interest for other countries all over the world. For several reasons some of these countries came to Indonesia to establish their existence and tried to monopolize the trading. These countries such as the Portuguese, the Spanish, the Dutch and the British built strengthened trade stations which later became forts all over Indonesia to defend their interest. The archipelago of Indonesia possesses a great number of fortification-works as legacies of native rulers and those which were built by European trading companies and later became colonial powers in the 16th to the 19th centuries. These legacies include those specific structures built as a defence system during pre and within the period of World War II. These fortresses are nowadaysvaluable subjects, because they might be considered as shared heritage among these countries and Indonesia. It's important to develop a vision to preserve these particular subjects of heritage, because they are an interesting part of the Indonesian history and its cultural treasures. The Government of the Republic of Indonesia has national program to compile a comprehensive documentation of the existing condition of these various types of forts as cultural heritage. The result of the 3 years project was a comprehensive 442 forts database in Indonesia, which will be very valuable to the implementation of legal protection, preservation matters and adaptive re-use in the future.

  6. Is subcranial Le Fort III plus Le Fort I osteotomy stable?

    PubMed

    Boos Lima, Fernanda Brasil Daura Jorge; Hochuli Vieira, Eduardo; Juergens, Philipp; Lima Junior, Sergio Monteiro

    2017-12-01

    The purpose of this study was to test whether associated subcranial Le Fort III (sLF III) and Le Fort I (LF I) osteotomies are stable after large advancements of the middle third of the face and maxilla. The authors designed a retrospective study and enrolled a sample of consecutive patients with midface hypoplasia treated with associated sLF III and LF I osteotomies in this IRB-approved study between September 2013 and February 2015. To test whether the long-term stability was satisfactory, the authors compared cephalometric changes from immediately after surgery to 18 months after surgery taken from multi-slice computed tomography using two different third-party imaging software programs. Statistical significance was set as P ≤ 0.05. The sample comprised 11 patients (mean age 23.84 ± 4.17 yr; 54% men). The mean advancement of the upper incisor immediately after surgery was 10.03 ± 1.6 mm. After 18 months, the position of the upper incisor did not vary significantly (10.18 ± 2.35 mm). All other cephalometric landmarks did not present statistically significant differences between immediately after and 18 months after surgery, with horizontal and vertical variations of less than one millimetre. This study supports that sLF III and LF I osteotomies are effective in maintaining stable horizontal and vertical skeletal positioning after surgery. Copyright © 2017 European Association for Cranio-Maxillo-Facial Surgery. Published by Elsevier Ltd. All rights reserved.

  7. Strategic Planning: Shaping Future Success

    DTIC Science & Technology

    2016-09-01

    fielding, the PM may also be planning for future increments , sustainment and other long-term ef- forts. Strategic planning can help the PM position these...introduced the Planning, Programming, and Budgeting System (PPBS) to the DoD. Prior to that, the DoD’s budget - ing focused on areas such as overhead

  8. Dorothy M. Schirtzinger: Librarian of the Year, 1996.

    ERIC Educational Resources Information Center

    Berry, John

    1997-01-01

    Profiles Dorothy M. Schirtzinger, library director at the Lee County Library System (LCLS) in Fort Myers, Florida. Discusses her education and early jobs; mentors; the educational mission of the library; increases and developments in staff, branches, budget, and in-library and outreach programs; automation; federal funding; and future plans. (AEF)

  9. 75 FR 21264 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... Defense. A0030-22 AMC System name: Army Food Management Information System Records System location.... 9397, as amended. Purpose(s): The Army Food Management Information System will be used to automate the...: Supervisor, Army Food Management Information System, Program Manager, 401 First Street, Suite 157, Fort Lee...

  10. 25 CFR 136.2 - Construction costs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Construction costs. 136.2 Section 136.2 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.2 Construction costs. The program of rehabilitation has now been completed at a cost of $419...

  11. 76 FR 55882 - Procurement List; Addition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... Americans to work, earn income and be productive members of society. The AbilityOne Program, which the... Administration, Fort Worth, TX. Coverage: A-List for the Total Government Requirement as aggregated by the... Information Management). [FR Doc. 2011-23107 Filed 9-8-11; 8:45 am] BILLING CODE 6353-01-P ...

  12. 25 CFR 136.2 - Construction costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Construction costs. 136.2 Section 136.2 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES FORT HALL INDIAN IRRIGATION PROJECT, IDAHO § 136.2 Construction costs. The program of rehabilitation has now been completed at a cost of $419...

  13. Report of the Television Task Force.

    ERIC Educational Resources Information Center

    Bedell, Fran; And Others

    In early 1985, one of the new television channels resulting from the expansion of the Fort Smith TV Cable Company was allocated to Westark Community College (WCC). In July, a task force was appointed to develop recommendations regarding programming, policies, staffing, equipment, physical location, and organizational location. This report presents…

  14. Darton College Customized Nursing Program for the Fort Benning Community and Research Project

    DTIC Science & Technology

    2013-10-01

    Netbook /laptop versions of English 1102, Communication 1101, PSYC 2115 and PHED 1161 will be developed for deployed students with limited or no...internet accessibility. Netbook /laptop versions of English 1102, Communication 1101, PSYC, and PHED 1161 for deployed students with limited or no

  15. A Study of the Integration of Military Personnel into the Fort Gordon Occupational Health Program.

    DTIC Science & Technology

    1980-05-01

    manpower data should be readily available to determine resource requirements. The other limiting factors which could bear on the problem include both...physical examinations and appropriate eyeglasses are provided based on both visual and safety requirements. Hazard inven- tories in areas jointly worked by

  16. Building Dreams on the High Ground.

    ERIC Educational Resources Information Center

    Benton, Sherrole; Ambler, Marjane

    1995-01-01

    Discusses the negative effects on Native American agriculture in the Upper Missouri River Valley from such federal projects as the Garrison Dam. Describes the Assistance, Counseling, and Training Project and cattle relending program at Fort Berthold Community College, indicating that they provide ranchers with a fully-funded education and help…

  17. Coastal Storm Surge Analysis: Storm Surge Results. Report 5: Intermediate Submission No. 3

    DTIC Science & Technology

    2013-11-01

    Vickery, P., D. Wadhera, A. Cox, V. Cardone , J. Hanson, and B. Blanton. 2012. Coastal storm surge analysis: Storm forcing (Intermediate Submission No...CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Jeffrey L. Hanson, Michael F. Forte, Brian Blanton

  18. Interview: Bryce Hach--High School Chemistry Teaching Gets a Boost

    ERIC Educational Resources Information Center

    Carr, Kate

    2009-01-01

    Science education reached the headlines of the local newspaper: "Foundation donates $33M! American Chemical Society gets support for chemistry teaching." This windfall came from the Hach Scientific Foundation in Fort Collins, Colorado. The $33 million will go to continue three programs initiated by the Hach Scientific Foundation. One…

  19. Request for qualifications for an evaluation of travel survey needs in the Dallas-Fort Worth metropolitan area

    DOT National Transportation Integrated Search

    1993-11-01

    The North Central Texas Council of Governments (NCTCOG) intends to retain the services of : an individual consultant or consultant team to assist in the development of a program design : for new household and transit surveys. The actual surveys will ...

  20. A Step or Two Back in Time.

    ERIC Educational Resources Information Center

    Thomson, Peggy

    1979-01-01

    Describes the National Park Service's Environmental Living Program for elementary school children in the San Francisco Bay Area, where teachers, parents, and children stay overnight in a historic fort and schooner, experience living in a past age, use candles and oil stoves, and engage in mock military and shipboard activities. (MF)

  1. 10. PERSPECTIVE VIEW (SOUTH) OF WEST TERREPLEIN OF NORTHWEST DEMIBASTION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. PERSPECTIVE VIEW (SOUTH) OF WEST TERREPLEIN OF NORTHWEST DEMI-BASTION SHOWING GUN MOUNTS AND RELATIONSHIP TO ESPLANADE AND BARRACKS - Fort Washington, Fort, 13551 Fort Washington Road, Fort Washington Forest, Prince George's County, MD

  2. FAA Aviation Forecasts

    DTIC Science & Technology

    1992-02-01

    MKK) Daytona Beach, FL (DAB) Boise, ID (BOI) Fort Lauderdale, FL (FLL) Idaho Falls Fanning Field, ID (IDA) Fort Lauderdale Executive, FL (FXE... Lewiston , ID (LWS) Fort Myers Page Field, FL (FMY) Pocatello, ID (PIH) Fort Myers Regional, FL (RSW) Twin Falls, ID (TWF) Fort Pierce, FL (FPR) Alton St... Idaho (SUN) 6. Marion Williamson County, Illinois (MWA) 7. Waukegan, Illinois (UGN) 8. Topeka-Phillip Ballard, Kansas (TOP) 9. Owensboro-Daviees County

  3. Centralized Control of Defense Acquisition Programs: A Comparative Review of the Framework from 1987 - 2003

    DTIC Science & Technology

    2003-09-29

    for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget...selected to be the Product Manager for the Joint Advanced Special Operations Radio System, at Fort Monmouth, New Jersey and successfully completed a...use,” or in defense terms-- operational effectiveness and suitability. Beyond the business aspects of program management , measurement of system

  4. University of Kansas Research and Educational Support for U.S. Army Programs and Initiatives at Fort Leavenworth, Kansas

    DTIC Science & Technology

    2013-09-03

    the flanking ranges are Cretaceous and Triassic igneous and metamorphic rocks . (O’Leary & Whitney, USGS Geologic Map of the Kandahar Region, 2005...focusing on interagency collaboration for US SOF officers who attend the Army’s Command and General Staff College; (2) a graduate business program...46. Holt, Christina; Fawcett, Stephen. “Supporting Transformative Community Change Efforts Using Online Technology.” 47. Holt, Christina; Fawcett

  5. Black Swan Event Assessment for Fort Leonard Wood, Missouri

    DTIC Science & Technology

    2016-03-01

    Fort Leonard Wood ERDC/CERL SR-16-1 March 2016 Black Swan Event Assessment for Fort Leonard Wood , Missouri James D. Westervelt Construction ...ER D C/ CE RL S R- 16 -1 Net Zero Planning for Fort Leonard Wood Black Swan Event Assessment for Fort Leonard Wood , Missouri Co ns... Wood ” ERDC/CERL SR-16-1 ii Abstract Emergency preparation typically involves evaluating disaster potential and consequences, followed by

  6. Fort Clatsop : Evaluation of Summer 2004 Operations.

    DOT National Transportation Integrated Search

    2004-09-30

    In 2005, Fort Clatsop National Memorial celebrates the bicentennial of the winter encampment of the Lewis and Clark expedition at Fort Clatsop. In the summer of 2004 a number of changes in operations were made at Fort Clatsop in anticipation of a lar...

  7. Base Realignment and Closure (BRAC) Cleanup Plan for Fort Devens, Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-08-01

    Fort Devens . The table will be updated as additional remedial actions are completed . Following Table D-1 are the executive summaries of...provides for the identification of appropriate, cost effective and integrated remedial actions , installation-wide. The BCT is working with the Fort Devens ...and 3-5, respectively. Three compliance-related activities at Fort Devens have been completed as early actions in order to reduce or eliminate

  8. Army Reserve Comprehensive Water Efficiency Assessments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McMordie Stoughton, Kate; Kearney, Jaime

    The Army Reserve has partnered with the Pacific Northwest National Laboratory (PNNL) to develop comprehensive water assessments for numerous Army Reserve Centers in all five regions including the Pacific islands and Puerto Rico, and at Fort Buchanan and Fort Hunter Liggett. The objective of these assessments is to quantify water use at the site, and identify innovative water efficiency projects that can be implemented to help reduce water demand and increase efficiency. Several of these assessments have focused on a strategic plan for achieving net zero water to help meet the Army’s Net Zero Directive . The Army Reserve hasmore » also leveraged this approach as part of the energy conservation investment program (ECIP), energy savings performance contracts (ESPCs), and utility energy service contracts (UESCs). This article documents the process involved.« less

  9. CHAP-2 heat-transfer analysis of the Fort St. Vrain reactor core

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kotas, J.F.; Stroh, K.R.

    1983-01-01

    The Los Alamos National Laboratory is developing the Composite High-Temperature Gas-Cooled Reactor Analysis Program (CHAP) to provide advanced best-estimate predictions of postulated accidents in gas-cooled reactor plants. The CHAP-2 reactor-core model uses the finite-element method to initialize a two-dimensional temperature map of the Fort St. Vrain (FSV) core and its top and bottom reflectors. The code generates a finite-element mesh, initializes noding and boundary conditions, and solves the nonlinear Laplace heat equation using temperature-dependent thermal conductivities, variable coolant-channel-convection heat-transfer coefficients, and specified internal fuel and moderator heat-generation rates. This paper discusses this method and analyzes an FSV reactor-core accident thatmore » simulates a control-rod withdrawal at full power.« less

  10. 9. STATEN ISLAND TOWER OF THE VERRAZANONARROWS BRIDGE, FORT WADSWORTH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. STATEN ISLAND TOWER OF THE VERRAZANO-NARROWS BRIDGE, FORT WADSWORTH IN FOREGROUND (SAME VIEW AS NY-303-8, BUT WITH SHORTER TIME EXPOSURE CAPTURING CLOUDS) - Verrazano-Narrows Bridge, Spanning Narrows between Fort Hamilton (Brooklyn) & Fort Washington (Staten Island), Brooklyn, Kings County, NY

  11. Prepare the Army for War. A Historical Overview of the Army Training and Doctrine Command, 1973 - 1993

    DTIC Science & Technology

    1993-01-01

    liaison officers at the other’s equivalent major schools-armor, aviation, air defense, field artillery, engineer , infantry, signal, ordnance... Engineer Center and Fort Belvoir, the Infantry Center and Fort Benning, the Air Defense Center and Fort Bliss, the Transportation Center and Fort...administered by the commander of the Araor Center and Fort Knox. TRADOC had 16 Army branch schools. Eight schools--the Air Defense, Armor, Engineer , Field

  12. BRAC, What Will it Cost

    DTIC Science & Technology

    1992-04-10

    Devens - Fort Huachuca FY 91 FY 95 Fort McClellan FY 92 FY 96 Fort Chaffee FY 92 FY 97 Cameron Station FY 91 FY 95 53 Stand Alone Housing Sites FY 90 FY...Army, Headquarters Forces Command, &as Realianment and Closure Implementation Plan - Fort Devens Closure Package, Implementation Plan, Fort McPherson, GA...Classification) RAC , What Will It Cost? 12. PERSONAL AUTHOR(S) TLIN, Robert B. LTC, USA 13. TYPE OF REPORT 13b. TIME COVERED 14. DATE OF REPORT (Year

  13. Nearshore Survey System Evaluation

    DTIC Science & Technology

    2017-12-01

    ER D C/ CH L TR -1 7- 19 Coastal Field Data Collection Program Nearshore Survey System Evaluation Co as ta l a nd H yd ra ul ic s La...Collection Program ERDC/CHL TR-17-19 December 2017 Nearshore Survey System Evaluation Michael F. Forte, William A. Birkemeier, and J. Robert Mitchell...No. 462585 ERDC/CHL TR-17-19 ii Abstract This report evaluates the accuracy of two systems for surveying the beach and nearshore zone. The 10

  14. Early Detection of Prostate Cancer with New Nanoparticle-Based Ultrasound Contrast Agents Targeted to PSMA

    DTIC Science & Technology

    2017-08-01

    Universities Grant Program 2014 Mentor, Minority Access to Research Careers (MARC) program, Emory University 2014 2014/05 ZCA1 SRLB-J (M1) S Quantitative ...AUGUST 2017 TYPE OF REPORT: ANNUAL PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION...and should not be construed as an official Department of the Army position, policy or decision unless so designated by other documentation. REPORT

  15. Evaluation of the Functional Pre-Basic-Training English-as-a-Second- Language Course

    DTIC Science & Technology

    1985-02-01

    orientation materials, two training video tapes have been recently prepared by the University of South Carolina under the direction of the ACES staff at Fort...most programs. Installations should receive guidelines describing an orientation program for new teachers. The video tapes developed by the University...should be instructed to increase their use of military training aids and be provided information and examples of how to do this. A video tape showing

  16. Suitability Measurement and Analysis for Fort Bliss Naval Air Facility OLS. Opportune Landing Site Program

    DTIC Science & Technology

    2008-09-01

    bushes on the RAS. ERDC/CRREL TR-08-16 71 d. Delphinium virescens.4 e. Nolina microcarpa .5 f. Lygodesmia exigua.6 Figure 27 (cont’d...4 There are a few of these plants along the RAS. 5 There are a few nolinas on the RAS

  17. Facilitating Social Interaction between Asian and Non-Asian Students: A Resource Booklet.

    ERIC Educational Resources Information Center

    Fort Lee School District, NJ.

    This resource guide provides teachers at all grade levels in the Fort Lee (New Jersey) School District with programs, activities, procedures, and resources to promote mutual understanding and improve inter-group relations between Asian and non-Asian students. Section I, "Outline of Classroom, All-School, and After-School Activities for…

  18. BDP Is Unified at the ATRF | Poster

    Cancer.gov

    By Ken Michaels, Staff Writer The Biopharmaceutical Development Program (BDP) at the Frederick National Laboratory is, for the first time ever, in a single building at the Advanced Technology Research Facility (ATRF). At Fort Detrick, BDP operations were spread out in about a dozen buildings, resulting in redundancies in maintaining various utilities (air handlers, clean

  19. 75 FR 52932 - Notice of Intent To Grant an Exclusive License; Doar, Pekuin, Sall Limited Liability Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-30

    ... Government- Owned invention as described in U.S. Patent No. 6,404,407 entitled ``Ridge laser with oxidized... National Security Agency Technology Transfer Program, 9800 Savage Road, Suite 6541, Fort George G. Meade, MD 20755-6541. FOR FURTHER INFORMATION CONTACT: Marian T. Roche, Director, Technology Transfer...

  20. Finding of No Significant Impact: Construction and Operation of an Emergency Services Center United States Air Force Academy, Colorado

    DTIC Science & Technology

    2012-02-08

    alternatives and resource issues. Agencies and Persons Consulted Jay Burgoon, Environmental Manager, USAFA Jeanie Duncan , Air Quality and Solid Waste Manager...Academy and their conservation. Colorado Natural Heritage Program, Colorado State University, Fort Collins, CO. Fitzgerald , J.P. and R.R

  1. Bridging the Hemispheres through the Use of Technology: International Collaboration in Social Work Training

    ERIC Educational Resources Information Center

    Rautenbach, John Victor; Black-Hughes, Christine

    2012-01-01

    The social work programs of the University of Fort Hare, East London, South Africa, and Minnesota State University, Mankato, United States, began using various technologies in 2007 to facilitate interaction. This project included conducting practicum supervision and seminars via videoconferencing (using Breeze, Adobe Connect, and Skype) and…

  2. Internal hydrological mechanism of permeable pavement and interaction with subsurface water - slides

    EPA Science Inventory

    A permeable pavement site located at the Seitz Elementary School on Fort Riley, Kansas was selected for this study. An 80-space parking lot was built behind the school as part of an EPA ORD collaboration with the U.S. Army under the Net Zero program. The parking lot design includ...

  3. Staff Directory: About Us: Smithsonian Marine Station (SMS) at Fort Pierce

    Science.gov Websites

    Advanced Search SMS Home About Us Ecosystems Exhibit Education & Fellowships Research Online Resources lastnamefirstinitial@si.edu. Resident Research Staff Benthic Ecology Program * Dr. Jessica Lunt Biologist, 772-462-0973 * Katrina Bayliss Research Assistant * Michelle Stephens Research Assistant, 772-462-0992 Caribbean Coral

  4. 76 FR 80744 - DoD Mandatory Declassification Review (MDR) Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Component shall consult with DOS as necessary to determine whether the information is subject to a treaty or... the Chairman of the Joint Chiefs of Staff and the Joint Staff, the Combatant Commands, the Office of... Road, Suite 6884, Fort George G. Meade, MD 20755-6884. (17) North American Aerospace Defense Command...

  5. Master of Military Art and Science (MMAS) Research and Thesis.

    ERIC Educational Resources Information Center

    Army Command and General Staff Coll., Fort Leavenworth, KS.

    This document describes the requirements for the degree of Master of Military Art and Science (MMAS) at the United States Army Command and General Staff College (CGSC), Fort Leavenworth, Kansas. Chapter one outlines program requirements for the MMAS, discusses the place of research at CGSC, describes research requirements for the MMAS, and…

  6. 77 FR 33687 - Proposed Establishment of Class E Airspace; Fort Morgan, CO

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-07

    ...: Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed rulemaking (NPRM). SUMMARY: This action proposes to establish Class E airspace at Fort Morgan, CO. Controlled airspace is necessary to... approach procedure at Fort Morgan Municipal Airport, Fort Morgan, CO. The FAA is proposing this action to...

  7. 75 FR 18084 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... 92069. Colorado: Larimer City of Fort Collins October 16, 2009; The Honorable Darin February 22, 2010 080102 (08-08-0893P). October 23, 2009; Atteberry, Manager, City Fort Collins of Fort Collins, 300 Coloradoan. LaPorte Avenue, Fort Collins, CO 80521. Larimer Unincorporated areas October 16, 2009; The...

  8. 15. Historic American Buildings Survey. Plan of Fort McHenry, by ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic American Buildings Survey. Plan of Fort McHenry, by William Tell Poussin, 1819. National Archives, Records of the War Department, Cartographic Section, Record Group 77, drawer 51, sheet 2. - Fort McHenry National Monument & Historic Shrine, East Fort Avenue at Whetstone Point, Baltimore, Independent City, MD

  9. Roof Plans: Section "CC", Roof Plan; Roof Framing Plans: Section ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Roof Plans: Section "C-C", Roof Plan; Roof Framing Plans: Section "C-C", Section "D-D"; Roof Framing Sections: Cross Section "G-G", Cross Section "H-H" - Fort Washington, Fort Washington Light, Northeast side of Potomac River at Fort Washington Park, Fort Washington, Prince George's County, MD

  10. Fort Independence: An Eighteenth-Century Frontier Homesite and Militia Post in South Carolina.

    DTIC Science & Technology

    1982-12-01

    zone was designated Zone 3. The matrix was a moist , black muck with some rocks present, as well as chunks of burned and unburned logs, a 60 x 90cm...area of strong Tory sentiment, Fort ." Independence was important in maintaining South Carolina’s frontier at a critical time. The fort was burned by...Fort Independence was important in maintaining South Carolina’s frontier at a critical time. The fort was burned by Tories in early 1779

  11. Evaluation of Lands for Recreational Snowmobile Use (Guidelines for Natural Resources Management and Land Use Compatibility).

    DTIC Science & Technology

    1981-05-01

    Percy , E. C., "The Snowmobile: Friend or Foe?" Journal of Trauma, Vol 12, No. 5 (May 1972), pp 444-446. Price, V. J., "Snowmobiles, The Winter Revolution...Fort Dix, NJ Hasset, John J., Agronomy Department, University of Illinois, Champaign, IL Huber, Phil, Environmental Offices, Fort Benning, GA Jackson ...Outdoor Recreation Director, Fort McCoy, WI Houser, James, Forester, Fort McCoy, WI Hutchinson, Julian, Land Manager, Fort McCoy, WI Jackson , Gary

  12. Outpatient Nonavailability Statement Procedures, Health Services Command Catchment Areas. Second Quarter, FY 1994 with Comparisons to First Quarter, FY 1994

    DTIC Science & Technology

    1994-05-01

    Commander, U.S. Army Medical Department Activity, Fort Carson, CO 80913-5101 (1) Commander, U.S. Army Medical Department Activity, Fort Devens , MA 01433...Medical Department Activity, Fort Carson, CO 80913-5101 (1) Director, Coordinated Care, U.S. Army Medical Department Activity, Fort Devens , MA 01433...016 * MAY 1994 I UNITED STATES ARMY HEALTH SERVICES COMMAND.I N FORT SAM HOUSTON, TEXAS 78234-6000 ’I I i TRI-SERVICE CHAMPUS STATISTICAL DATABASE

  13. Military Manpower Training Report for FY 1981.

    DTIC Science & Technology

    1980-03-01

    1,167 483 102 Fort Benning, GA 2,808 1,081 134 Fort B. Harrison, IN 2,444 379 92 Fort Bliss, TX 1,442 958 265 Fort Bragg, NC 446 618 90 Fort Devens ...management action to reduce the administrative time used to form recruit training platoons. This action reduces the average time in training for new...must be made for course attrition, the number of students entering a course of instruction who fail to complete it. The total input requirement must

  14. Military Manpower Training Report for FY 1980.

    DTIC Science & Technology

    1979-03-01

    2,183 374 85 Fort Bliss, TX 2,415 1,464 335 Fort Bragg, NC 581 628 111 Fort Devens , MA 1,356 847 102 Fort Dix, NJ 51 22 23 Fort Eustis, VA 1,741 877...students entering a course of instruction who fail to complete it. The total input requirement must, therefore, be increased to compensate for...discussed above. Some recruits fall behind their peers because of illness. Others require remedial training. If this cannot be accomplished by additional

  15. Military Manpower Training Report for FY 1985. Volume 4. Force Readiness Report.

    DTIC Science & Technology

    1984-02-01

    3,848 937 182 Fort B. Harrison, IN 3,527 609 111 Fort Bliss, TX 2,059 922 283 Fort Bragg, NC 1,031 687 66 Fort Devens , MA 1,250 804 205 Fort Dix, NJ...attrition, the number of students entering a course of instruction who fail to complete it. The total input requirement must, therefore, be increased to...lengths discussed above. Some recruits fall behind their peers because of illness. Others require remedial training. If this cannot be accomplished by

  16. Military Manpower Training Report FY 1987. Volume 4. Force Readiness Report

    DTIC Science & Technology

    1986-03-01

    1,902 807 405 Fort Bragg, NC 1,257 807 203 Fort Devens , MA 949 910 208 Fort Dix, NJ 1,725 480 7 Fort Eustis, VA 3,057 1,124 304 Fort Gordon, GA... complete it. The total input requirement must, therefore, be increased to compensate for expected attrition losses. The optimal leveling of monthly...above. Some recruits fall behind their peers because of illness. Others require remedial training. If this cannot be accomplished by additional

  17. Fort Stewart integrated resource assessment. Volume 1, Executive summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, L.L.; Keller, J.M.

    1993-10-01

    The US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), has developed a model program that provides a systematic approach to evaluating energy opportunities that (1) identifies the building groups and end uses that use the most energy (not just have the greatest energy-use intensity), and (2) evaluates the numerous options for retrofit or installation of new technology that will result in the selection of the most cost-effective technologies. In essence, this model program provides the federal energy manager with a roadmap to significantly reduce energy use in a planned, rational, cost-effectivemore » fashion that is not biased by the constraints of the typical funding sources available to federal sites. The results from this assessment process can easily be turned into a five- to ten-year energy management plan that identifies where to start and how to proceed in order to reach the mandated energy consumption targets. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the US Army US Forces Command (FORSCOM) Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 2, Baseline Detail, and Volume 3, Resource Assessment.« less

  18. 77 FR 58354 - Bend-Fort Rock Ranger District; Oregon; Withdrawal of Notice for Preparation of an Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ...-Fort Rock Ranger District; Oregon; Withdrawal of Notice for Preparation of an Environmental Impact... Administration, USDOT. ACTION: Notice of withdrawal. SUMMARY: The Bend-Fort Rock Ranger District and FHWA are..., Project Leader, Bend- Fort Rock Ranger District, 63095 Deschutes Market Road, Bend, OR 97701, phone 541...

  19. 40 CFR 81.39 - Metropolitan Dallas-Fort Worth Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 17 2011-07-01 2011-07-01 false Metropolitan Dallas-Fort Worth... Designation of Air Quality Control Regions § 81.39 Metropolitan Dallas-Fort Worth Intrastate Air Quality Control Region. The Metropolitan Dallas-Fort Worth Intrastate Air Quality Control Region (Texas) has been...

  20. 40 CFR 81.39 - Metropolitan Dallas-Fort Worth Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Metropolitan Dallas-Fort Worth... Designation of Air Quality Control Regions § 81.39 Metropolitan Dallas-Fort Worth Intrastate Air Quality Control Region. The Metropolitan Dallas-Fort Worth Intrastate Air Quality Control Region (Texas) has been...

  1. 40 CFR 81.63 - Metropolitan Fort Smith Interstate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Metropolitan Fort Smith Interstate Air... Air Quality Control Regions § 81.63 Metropolitan Fort Smith Interstate Air Quality Control Region. The Metropolitan Fort Smith Interstate Air Quality Control Region (Arkansas-Oklahoma) has been revised to consist...

  2. 14. Historic American Buildings Survey. Copy of plan of Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Historic American Buildings Survey. Copy of plan of Fort McHenry, November 9, 1803, authorship unknown. National Archives, Records of the War Department, Cartographic Section, Record Group 77, drawer 51, sheet 1. - Fort McHenry National Monument & Historic Shrine, East Fort Avenue at Whetstone Point, Baltimore, Independent City, MD

  3. U.S. Policy Approaches for Maintaining Stability in the Asia-Pacific Region: History, Economics, and Soft Power

    DTIC Science & Technology

    2014-05-01

    5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) CDR Scott N. Richardson United States Navy 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) U.S. Army Command and General Staff College ATTN: ATZL-SWD-GD Fort Leavenworth, KS...66027-2301 8. PERFORMING ORG REPORT NUMBER 9. SPONSORING / MONITORING AGENCY NAME( S ) AND ADDRESS(ES) Advanced Strategic Leadership Studies Program

  4. Deployment Effects on Children and Adolescents: Designing and Deploying a Developmentally Appropriate Education and Screening Video Program for Military Families

    DTIC Science & Technology

    2009-03-22

    the videos. 24% of children felt they could talk more easily about issues after seeing the program. Facilitator’s guides were provided to stimulate ...be physical, sexual , or psychological to a current or former dating partner or spouse (Plichta. 2004). took place in 2002 at Fort Bragg, North...video format, available on the Internet, will be particularly useful for children with visual and/or auditory learning preferences for whom

  5. Summaries of Conclusions and Recommendations on Department of Defense Operations.

    DTIC Science & Technology

    1983-03-04

    of Defense - Military (Except Procurement and Contracting) (051.0) Legislative Authodty: PL 96-226. In an attempt to reduce training costs and make...efeseAuthorization Act 1981 ( PL N6-432). S.Rept.97-146.S. RepL.96-89.3 U.S.C. 301b. GAO evaluated the Na" and Marine Corps Im~plementation program should be extended...Incentives Maer Illea ee Command, Fort Mon of Foreign Currency Transact.ons (FPCD-82-13) 28 motsi, NJ for NATO Programs Teleprocessing Serces Contracts for

  6. Update on Key Studies - The Millennium Cohort Study, The STAMPEDE Study, The Million Veteran Program, and The National Health Study for a New Generation of US Veterans

    DTIC Science & Technology

    2015-01-01

    Department of Defense Chair, Staff Physician, Pulmonary /Critical Care Medicine and Assistant Program Director, Internal Medicine Residency, San... Pulmonary /Critical Care Medicine, William Beaumont Army Medical Center, Fort Bliss, 5005 North Piedras Street, El Paso, Texas 79920 §Colonel (Retired...and veterans are reviewed. These studies include • the Millennium Cohort Study (MCS), • STAMPEDE (Study of Active Duty Military for Pulmonary

  7. Research Donor Program Needs Your Help to Advance Cancer and AIDS Research | Poster

    Cancer.gov

    NCI at Frederick employees have a unique opportunity to contribute directly to cancer and AIDS research by donating blood, saliva, and other samples through the Research Donor Program (RDP). Donors are compensated for their time, which is typically between 10 and 30 minutes. The RDP, which is administered by Occupational Health Services (OHS), Leidos Biomedical Research, provides samples from healthy donors for use in in vitro research conducted at NCI at Frederick and Fort Detrick. Samples are provided anonymously to researchers.

  8. Characterization of stormwater runoff from the Naval Air Station and Naval Wepons Industrial Reserve Plant, Dallas, Texas, 1994-96

    USGS Publications Warehouse

    Raines, T.H.; Baldys, Stanley; Lizarraga, J.S.

    1997-01-01

    Median event-mean concentrations computed for 12 selected constituents in samples from NAS and NWIRP fixed sites were compared to median event-mean concentrations for residential, commercial, industrial, and highway land uses within the Dallas-Fort Worth area computed from data collected for the National Pollutant Discharge Elimination System program. NAS and NWIRP median event-mean concentrations also were compared to those for residential and commercial land uses from the Nationwide Urban Runoff Program.

  9. Formative Evaluation of an Adaptation of the Feuerstein Instrumental Enrichment Program in the US Army Basic Skills Education Program (BSEP II)

    DTIC Science & Technology

    1984-10-01

    87 ix CONTENTS (Continued) Page APPENDIX D. COGNITIVE SKILLS TEST ....... ................... .. 98 E. CLASSROOM OBSERVATION FORM...You arrzive ac tine, but nobody is at the c2ub. Vhy? (Give a possible explanaztion.) APPENDIX E Classroom Observation Form 106 B.&SIC ERLLS ED-:UCA1O...gains to be expected, researchers observed classroom instruction in each IE BSEP cycle at Fort Knox. (See Appendix E for a copy of the Classroom

  10. 78 FR 28622 - Notice of Approval of Record of Decision for Extending F-Line Streetcar Service to Fort Mason...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ...] Notice of Approval of Record of Decision for Extending F-Line Streetcar Service to Fort Mason Center... Environmental Impact Statement (Final EIS) for extending the F-Line historic streetcar service to Fort Mason... turnaround terminus at the Fort Mason Center; and installing appurtenant features such as signals, crossings...

  11. Case Study: Fort Mill High School--A Culture of Continuous Improvement

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2014

    2014-01-01

    This is the latest in a series of case studies highlighting best practices High Schools That Work (HSTW) network schools and districts are implementing to prepare students better for further studies and careers. Fort Mill High School is in Fort Mill, South Carolina, an outlying suburb of Charlotte, North Carolina. Fort Mill links high quality…

  12. 75 FR 17851 - Amendment of Class E Airspace; Dallas-Fort Worth, TX

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ...-0926; Airspace Docket No. 09-ASW-26] Amendment of Class E Airspace; Dallas-Fort Worth, TX AGENCY... airspace in the Dallas-Fort Worth, TX area. Additional controlled airspace is necessary to accommodate new... proposed rulemaking to amend Class E airspace for the Dallas- Fort Worth, TX area (74 FR 57617) Docket No...

  13. 78 FR 9105 - Notice of Intent To Rule on Request To Release Airport Property at the Dallas/Fort Worth...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-07

    ... To Release Airport Property at the Dallas/Fort Worth International Airport, DFW Airport, TX AGENCY... easement at the Dallas/Fort Worth International Airport under the provisions of Section 125 of the Wendell..., Chief Executive Office, at the following address: Dallas/Fort Worth International Airport, Executive...

  14. 78 FR 58380 - Notice of Intent To Rule on Request To Release Airport Property at the Dallas/Fort Worth...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... To Release Airport Property at the Dallas/Fort Worth International Airport, DFW Airport, Texas AGENCY... Dallas/Fort Worth International Airport under the provisions of Section 125 of the Wendell H. Ford... or delivered to Mr. Jeff Fegan, Chief Executive Office, at the following address: Dallas/Fort Worth...

  15. 75 FR 55401 - Notice of Intent To Rule on Request To Release Airport Property at the Dallas/Fort Worth...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-10

    ... To Release Airport Property at the Dallas/Fort Worth International Airport, DFW Airport, TX AGENCY... easement at the Dallas/Fort Worth International Airport under the provisions of Section 125 of the Wendell.... Jeff Fegan, Chief Executive Office, at the following address: Dallas/Fort Worth International Airport...

  16. 77 FR 30884 - Amendment of Restricted Area R-2502E; Fort Irwin, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ...-0461; Airspace Docket No. 12-AWP-1] RIN 2120-AA66 Amendment of Restricted Area R-2502E; Fort Irwin, CA... designated controlling agency for restricted area R-2502E, Fort Irwin, CA, from the Federal Aviation... Airspace System, the FAA is changing the assigned controlling agency for restricted area R-2502E, Fort...

  17. 16. Historic American Buildings Survey. Portion of a plan of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Historic American Buildings Survey. Portion of a plan of Fort McHenry, by William Tell Poussin, 1819, National Archives, Records of the War Department, Cartographic Section, Record Group 77, drawer 51, sheet 2. Plan of fort and enclosed buildings. - Fort McHenry National Monument & Historic Shrine, East Fort Avenue at Whetstone Point, Baltimore, Independent City, MD

  18. 77 FR 45237 - Amendment of Class D and E Airspace; Fort Rucker, AL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-31

    ...; Airspace Docket No. 12-ASO-30] Amendment of Class D and E Airspace; Fort Rucker, AL AGENCY: Federal... Class D and E Airspace at Fort Rucker, AL, by updating the geographic coordinates of Cairns Army Air... continued safety and management of instrument flight rules (IFR) operations within the Fort Rucker, AL...

  19. Improvements to Air Force Strategic Basing Decisions

    DTIC Science & Technology

    2016-01-01

    Fort Lee, VA 10,200 4,600 14,800 138,000 Fort Lewis, WA 13,500 17,400 30,900 3,422,000 Fort Meade , MD 7,000 4,200 11,200 2,512,000 Fort Sam...Aberdeen Proving Grounds, Fort Meade , and the Bethesda National Naval Medical Center were scheduled to add over 12,000 personnel in total. The state of...Influences on Air Force Basing Decisions According to Edward Mead Earle, “Strategy is the art of controlling and utilizing the resources of a nation—or a

  20. Wrought Stainless Steel Fasteners for Civil Works Applications.

    DTIC Science & Technology

    1982-03-01

    Library Europe 09757 Fort Devens 01433 Huntsville 35807 Fort Drum 13604 ETL, AIT: Library 22080 Lower Mississippi Valley 39180 Fort Hood 76544 Middle...general C ). It cati be nitrided anid shows a dimnensiotnal cont rac - fabricating characteristics of’ 17-4 P11 SS are sitnilat tion ott heat t reatmnt tiup...CCP ATTN: EAE-ID 96224 Fort Lesley J. nesir euJn AIIN: OALM CH AITN: EAFE-41 9b/Ud Fort Myer eZZ1 AIIM. UAE-Cat ATTN: tAFE-H 9b271 ATTN, UAA-CW4M

  1. An Overview of the Ecological Effects of Tracked Vehicles on Major U.S. (United States) Army Installations

    DTIC Science & Technology

    1983-02-01

    IL 41868 runtsil ie 35807 Fort Devens 01433 3345 CES/IE, stop 27 .oner 4ississipPi 4ulley 39180 Fort Drm 13601 -’dole East )9018 Fort Hood 7654.4...training. Detailed quantitative data were obtained from Forts Polk, Knox, Hood, and Lewis; supplementary semi-quantitative and qualitative studies were...done at Forts Benning, Bliss, Carson, Drum, Irwin, Riley, and Stewart, and at Yakima Firing Range. v- (continued on next page) D1JAN7373 3 ETOOFNO6

  2. --No Title--

    Science.gov Websites

    ; Home Fort Belvoir Community Hospital Fort Belvoir Community Hospital Launches Mobile Application for Patients Mobile Application Launches Fort Belvoir Community Hospital Launches Mobile Application for

  3. Development of a Graduate Education Program for U.S. Army Interns and Careerists

    ERIC Educational Resources Information Center

    Schmidt, Steven W.; Mott, Vivian W.

    2012-01-01

    In the winter of 2007, a small group of faculty and administrators at East Carolina University (ECU) began discussions with personnel at the U.S. Army Training and Doctrine Command (TRADOC) at Fort Monroe, Virginia, regarding the education and continuing professional development of U.S. Army civilian interns and careerists (two types of…

  4. An Experimental Evaluation of Stress-Management Training for the Airborne Soldier. Technical Report 550.

    ERIC Educational Resources Information Center

    Burke, William P.

    A project was conducted to evaluate the effectiveness of the stress-management training given to students in the jumpmaster training course at Fort Benning, Georgia. The course, which trains airborne personnel to conduct landings of men and equipment, features relatively stressful training programs during which instructors grade the performance of…

  5. Positioning Faculty Support as a Strategy in Assuring Quality Online Education

    ERIC Educational Resources Information Center

    Wang, Hong; Gould, Lawrence V.; King, Dennis

    2009-01-01

    With the rapid growth of online programs and courses at Fort Hays State University (FHSU), the university has faced the challenge of supporting faculty members as they transition to online teaching. Hong Wang, Lawrence V. Gould, and Dennis King share the comprehensive approach the university has developed, an approach that depends on effective…

  6. User Data Package - Energy-Efficient Windows and Window Coverings for Naval Housing

    DTIC Science & Technology

    1990-07-01

    1765 33 Savannah 1819 32 Tucson 1800 32 Winslow 4782 35 Idaho Yuma 974 33 Boise 5809 44 Lewiston 5542 46 Arkansas Pocatello 7033 43 Fort Smith 3292 35...Alexandria, VA DODDS Pac, FAC, Okinawa, Japan DOE Fed Energy Mgt Program, Wash, DC: INEL Tech Lib Reports Sta. Idaho Falls. ID; Knolls Atomic Pwr Lab

  7. Creating Pathways to a Better Life: How Four Tribal Colleges Are Training Skilled Workers to Meet Regional Needs

    ERIC Educational Resources Information Center

    Worley, Jerry

    2014-01-01

    With the tremendous job growth and economic boom on the Northern Plains, tribal colleges in Montana and North Dakota are initiating new innovative programs to address the region's workforce necessities. United Tribes Technical College (UTTC), Fort Peck Community College (FPCC), Aaniiih Nakoda College (ANC), and Cankdeska Cikana Community College…

  8. Aquatic Plant Control Research Program. Biological Control of Pistia stratiotes L. (Waterlettuce) Using Neohydronomus affinis Hustache (Coleoptera: Curculionidae).

    DTIC Science & Technology

    1992-07-01

    plant must also be examined for herbivores attacking the weed. This ensures that time and money are not wasted by importing insects already present in...Agricultural Research Service Aquatic Weed Research Laboratory in Fort Lauder - dale, FL, from quarantine tacilities in Gainesville, FL, on 11 February

  9. Military Librarians Workshop (19th). Intellectual Updating: Changes in the State of the Art of Librarianship, 30 September - 2 October 1975

    DTIC Science & Technology

    1975-01-01

    Force instructor pilots two swimming pools, basketball will administer the 18 hours of this courts, squash and handball courts, program. Additional...Group Annex Fort Lee, VA 23801 Naval Weapons Station. Seal Beach Corona, CA 91720 ELDEEN J. GREENLAND Library Technician MARGARET L. GALLAGHER USA

  10. Net Zero Fort Carson: Integrating Energy, Water, and Waste Strategies to Lower the Environmental Impact of a Military Base

    EPA Science Inventory

    Military bases resemble small cities and face similar sustainability challenges. As pilot studies in the U.S. Army Net Zero program, 17 locations are moving to 100% renewable energy, zero depletion of water resources, and/or zero waste to landfill by 2020. Some bases target net z...

  11. Defense.gov Special Report: Hispanic Heritage Month

    Science.gov Websites

    , practice and test their skills in STEM. Name: Coast Guard Lt. Cmdr. Luis Carmona Coast Guard Lt. Cmdr. Luis of the Coast Guard's College Student Pre-Commissioning Initiative program, leveraged his extensive to the U.S. Army Operational Test Command, Fort Hood, Texas, where he served as chief of the Combat

  12. Proposed Regulation of Fuels and Fuel Additives: Federal Volatility Control Program in the Denver-Boulder-Greeley-Ft. Collins-Loveland, Colorado, 1997 8-Hour Ozone Nonattainment Area Additional Resources

    EPA Pesticide Factsheets

    Federal Register and fact sheet for EPA's proposed rule which would extend the federal summertime low volatility requirements to those portions of the Denver-Boulder-Greeley-Fort Collins-Loveland, Colorado, 1997 8-hour Ozone Nonattainment area are here.

  13. Choosing Optional Career Education. Project Choice 1988-89. OREA Report. Evaluation Section Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Plotkin, Donna

    This report evaluates the implementation and outcome of the Elementary and Secondary Education Act Title VII program, Choosing Optional Infused Career Education (Project CHOICE) in Springfield Gardens High School in Queens (New York) and Fort Hamilton High School in Brooklyn (New York) for the 1988-89 school year. The project was created to combat…

  14. nalyses of rhizoctonia screening nursery results over 15 selected years from 1980 to 2015

    USDA-ARS?s Scientific Manuscript database

    The USDA-ARS has had a research program at Fort Collins focused on breeding for resistance to Rhizoctonia crown and root rot (Rcrr) since the late 1950s. By 1980, current resistant and susceptible checks were in use. All individual roots from each plot were lifted and rated on a disease index (DI)...

  15. Fire Science Strategy: Resource Conservation and Climate Change

    DTIC Science & Technology

    2014-09-01

    SMOKE MANAGEMENT ISSUES: CONCLUSIONS—KEY RESEARCH/DEMONSTRATION GAPS COVER PHOTO: CHONG, JOEY 2011. USDA FOREST SERVICE. FORT JACKSON...Fire Science Program LiDAR Light Detection and Ranging LANL Los Alamos National Lab NASA National Aeronautics and Space Administration NCAR...entities include the National Aeronautics and Space Administration ( NASA ), EPA, National Center for Atmospheric Research (NCAR), National Institute of

  16. Environmental Quality Technology Demonstration, Evaluation and Transfer Activities

    DTIC Science & Technology

    1996-12-02

    and Appropriate Requirements) and ARAR support documentation for interim and final Installation Restoration Program (IRP) remedial actions . During the...Relevant and Appropriate Requirements (ARARs) for Fort Devens , Massachusetts. Delivered Federal Environmental Legislative Power Curve in hard copy and... Remedial Actions . Delivered revised tables for Desk Guide on Interpretation of Applicable or Relevant and Appropriate Requirements — Interim Draft

  17. Reflections on the Quality Indicator Process

    ERIC Educational Resources Information Center

    Barrett, James R.; Taggart, Germaine

    2011-01-01

    The purpose of this paper is to share a description of the process used by Fort Hays State University (FHSU) as a self-study of the FHSU alternative certification program, known as Transition to Teaching. Team members used the Quality Indicators designed as a part of a Department of Education Transition to Teaching Grant called the KNOTtT Project.…

  18. Biomechanical considerations for distraction of the monobloc, Le Fort III, and Le Fort I segments.

    PubMed

    Figueroa, Alvaro A; Polley, John W; Figueroa, Aaron D

    2010-09-01

    Distraction osteogenesis is effective for correction of severe maxillary and midface hypoplasia. The vectors controlling the segment to be moved must be planned. This requires knowledge of the physical characteristics of the osteotomized bone segment, including the location of the center of mass (free body) and the center of resistance (restrained body). The purpose of this study was to determine the center of mass of the osteotomized monobloc, Le Fort III, and Le Fort I bone segments. A dry human skull was used to sequentially isolate three bone segments: monobloc, Le Fort III, and Le Fort I. Each segment was suspended from three different points, and digital photographs were obtained from each suspension. The photographs were digitally superimposed. The center of mass was determined by calculating the intersection of the suspension lines. The center of mass for the monobloc segment was located at a point 43.5 percent of the total height from the occlusal plane to the superior edge of the frontal bone supraorbital osteotomy. For the Le Fort III, it was located 38 percent of the total height from the occlusal plane to the superior edge of the osteotomized base of the nasal bones. For the Le Fort I, it was 53 percent of the total height from the occlusal plane to the superior edge of the osteotomized maxillary bone. Knowledge of the location of the center of mass in the monobloc, Le Fort III, and Le Fort I segments provides a starting point for the clinician when planning vectors for advancement with distraction.

  19. Simultaneous trapping of rubidium-85 and rubidium-87 in a far off resonant trap

    NASA Astrophysics Data System (ADS)

    Gorges, Anthony R.

    The experiments described in this thesis were focused on the physics of simultaneous trapping of 85Rb and 87 Rb into a Far Off Resonant Trap (FORT), with a view towards the implementation of a nonevaporative cooling scheme. Atoms were first trapped in a Magneto Optical Trap (MOT) and from there loaded into the FORT. We investigated the effects of loading the FORT from a MOT vs. an optical molasses; observing that the molasses significantly improved the trapped atom number. The ultimate number of atoms trapped is determined by a balance between efficient laser cooling into the FORT and light-assisted collisional losses from the FORT. We have studied and measured the loss rates associated with light-assisted collisions for our FORT, measuring both heteronuclear and homonuclear collisions. It was discovered that induced long range dipole-dipole interactions between 85Rb and 87Rb have a significant impact on FORT loading. This interaction interferes with the loading into the trap and thus limits the number of atoms which can be trapped in the FORT under simultaneous load conditions. Despite this limitation, all required experimental parameters for our future measurements have been met. In addition to these FORT studies, we have found a technique which can successfully mitigate the effects of reabsorption in optically thick clouds, which is a limitation to the ultimate temperature an atom cloud will reach during light-based cooling. Planned future measurements for this project include the creation of a variable aspect ratio FORT; along with investigating collision assisted Zeeman cooling.

  20. 76 FR 72973 - Notice of Lodging of Consent Decree Under the Clean Water Act and Safe Drinking Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-28

    ... Decree'') in United States, et al. v. Town of Fort Gay, Civil Action No. 3:09-0855 was lodged with the... Fort Gay, West Virginia (``Defendant'' or ``Fort Gay'') for permanent injunctive relief and civil... requirements, to prepare and submit certain reports, to make capital improvements to the Fort Gay waste water...

  1. Controls Over Materiel Procured for Direct Vendor Delivery

    DTIC Science & Technology

    1995-02-10

    National Guard, Company D, 560th Engineer Battalion, Bainbridge, GA Army National Guard, Company E, 121st Infantry Battalion, Tifton , GA Joint...Command, Fort Monmouth, NJ United States Army Forces Command, Atlanta, GA United States Army Materiel Command, Alexandria, VA United States Army...Fort Gillem, GA Headquarters, Fort Lee, Petersburg, VA Headquarters, Fort Riley, KS Headquarters, National Guard Bureau, Washington, DC Headquarters

  2. 77 FR 34285 - Safety Zone; 2012 Ironman U.S. Championship Swim, Hudson River, Fort Lee, NJ

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ...-AA00 Safety Zone; 2012 Ironman U.S. Championship Swim, Hudson River, Fort Lee, NJ AGENCY: Coast Guard... safety zone on the navigable waters of the Hudson River in the vicinity of Englewood Cliffs and Fort Lee... the Hudson River in the vicinity of Englewood Cliffs and Fort Lee, New Jersey. This swim event poses...

  3. 77 FR 46613 - Safety Zone; 2012 Ironman US Championship Swim, Hudson River, Fort Lee, NJ

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-06

    ... 1625-AA00 Safety Zone; 2012 Ironman US Championship Swim, Hudson River, Fort Lee, NJ AGENCY: Coast... navigable waters of the Hudson River in the vicinity of Englewood Cliffs and Fort Lee, NJ for the 2012... Championship Swim, Hudson River, Fort Lee, NJ in the Federal Register (77 FR 34285). We received no comments on...

  4. Military Nurses Perceptions of Autonomy

    DTIC Science & Technology

    2002-05-01

    Medical Battalion, Fort Sam Houston, TX. 1996-1998 Head Nurse, Newborn Nursery, Bayne -Jones Army Community Hospital, Fort Polk, LA. 1996-1998 Staff Nurse...Army Medical Center, Fort Sam Houston, TX. 1984-1990 NCOIC, Department of Biochemistry , Division of Biochemistry , Walter Reed Army Institute of...Publications:(under previous name De La Hoz)(Selected) De La Hoz, D. and Wood, S. (1995). Pediatric Quick Reference. Brooke Army Medical Center, Fort Sam

  5. Environmental Assessment: Fort Greely Installation, Fort Greely, Alaska

    DTIC Science & Technology

    2005-04-18

    Products ineffective. Actions taken to remove products from Mosquito Repelling the marketplace. Endrin Most uses cancelled. EPN Mosquito larvicide products...Preservation Act (NHPA) of 1966, as amended. The ICRMP includes chapters on the following topics: "* Geographic Overview of the Fort Greely Region...34* Prehistoric and Historic Overview of the Fort Greely Area "* Legal Foundation and Methodology for the ICRMP "* Standard Operating Procedures (SOPs) for

  6. 78 FR 63866 - Modification of Restricted Areas R-6901A & R-6901B; Fort McCoy, WI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ...-0838; Airspace Docket No. 12-AGL-17] Modification of Restricted Areas R-6901A & R-6901B; Fort McCoy, WI...: This action amends Restricted Areas R-6901A and R-6901B, Fort McCoy, WI, to accurately identify the... 44597, December 11, 1986) modifying the boundaries and time of designation of the existing R-6901, Fort...

  7. Rail and Motor Outloading Capability Study. Fort Devens, Massachusetts,

    DTIC Science & Technology

    1980-03-01

    AD-AI 765 MILITARY TRAFFIC MANAGEMENT COMMAND TRANSPORTATION EN-ETC FIO 15/5 RAIL AND MOTOR OUTLOADING CAPABILITY STUDY. FORT DEVENS . MASSAC-ETC(U...REPORT TE 79-4-54 RAIL AND MOTOR OUTLOADING CAPABILITY STUDY FORT DEVENS , MASSACHUSETTS Accession Far DTIC TAB March 1980 _stribution/ Av_alability...INTRODUCTION 6.. . .. . . II. ANALYSIS OF FORT DEVENS ’ RAIL OUTLOADING FACILITIES ... . . .. . .9 A. General .9.. B. Rail Facility Description

  8. (Updated) Fort Detrick Gate Hours Change Effective April 10 | Poster

    Cancer.gov

    The Fort Detrick gate hours will change beginning Friday, April 10. The new hours were recently provided by the U.S. Army Garrison (USAG), Fort Detrick. NCI will continue to work with the USAG to address questions that may arise. Note that no changes have been made for facilities outside of the Fort Detrick campus (e.g., the Advanced Technology Research Facility).

  9. Field monitoring and evaluation of a residential gas-engine-driven heat pump: Volume 2, Heating season

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, J.D.

    1995-11-01

    The Federal Government is the largest single energy consumer in the United States; consumption approaches 1.5 quads/year of energy (1 quad = 10{sup 15} Btu) at a cost valued at nearly $10 billion annually. The US Department of Energy (DOE) Federal Energy Management Program (FEMP) supports efforts to reduce energy use and associated expenses in the Federal sector. One such effort, the New Technology Demonstration Program (NTDP), seeks to evaluate new energy-saving US technologies and secure their more timely adoption by the US Government. Pacific Northwest Laboratory (PNL) is one of four DOE national multiprogram laboratories that participate in themore » NTDP by providing technical expertise and equipment to evaluate new, energy-saving technologies being studied and evaluated under that program. This two-volume report describes a field evaluation that PNL conducted for DOE/FEMP and the US Department of Defense (DoD) Strategic Environmental Research and Development Program (SERDP) to examine the performance of a candidate energy-saving technology -- a gas-engine-driven heat pump. The unit was installed at a single residence at Fort Sam Houston, a US Army base in San Antonio, Texas, and the performance was monitored under the NTDP. Participating in this effort under a Cooperative Research and Development Agreement (CRADA) were York International, the heat pump manufacturer; Gas Research Institute (GRI), the technology developer; City Public Service of San Antonio, the local utility; American Gas Cooling Center (AGCC); Fort Sam Houston; and PNL.« less

  10. Preliminary assessment of streamflow characteristics for selected streams at Fort Gordon, Georgia, 1999-2000

    USGS Publications Warehouse

    Stamey, Timothy C.

    2001-01-01

    In 1999, the U.S. Geological Survey, in cooperation with the U.S. Army Signal Center and Fort Gordon, began collection of periodic streamflow data at four streams on the military base to assess and estimate streamflow characteristics of those streams for potential water-supply sources. Simple and reliable methods of determining streamflow characteristics of selected streams on the military base are needed for the initial implementation of the Fort Gordon Integrated Natural Resources Management Plan. Long-term streamflow data from the Butler Creek streamflow gaging station were used along with several concurrent discharge measurements made at three selected partial-record streamflow stations on Fort Gordon to determine selected low-flow streamflow characteristics. Streamflow data were collected and analyzed using standard U.S. Geological Survey methods and computer application programs to verify the use of simple drainage area to discharge ratios, which were used to estimate the low-flow characteristics for the selected streams. Low-flow data computed based on daily mean streamflow include: mean discharges for consecutive 1-, 3-, 7-, 14-, and 30-day period and low-flow estimates of 7Q10, 30Q2, 60Q2, and 90Q2 recurrence intervals. Flow-duration data also were determined for the 10-, 30-, 50-, 70-, and 90-percent exceedence flows. Preliminary analyses of the streamflow indicate that the flow duration and selected low-flow statistics for the selected streams averages from about 0.15 to 2.27 cubic feet per square mile. The long-term gaged streamflow data indicate that the streamflow conditions for the period analyzed were in the 50- to 90-percent flow range, or in which streamflow would be exceeded about 50 to 90 percent of the time.

  11. Vault Area (original section), south corridor, looking west Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Vault Area (original section), south corridor, looking west - Fort McNair, Film Store House, Fort Lesley J. McNair, P Street between Third & Fourth Streets, Southwest, Washington, District of Columbia, DC

  12. 77 FR 47859 - Proposed Flood Hazard Determinations; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-10

    ... Boulevard, Deerfield Beach, FL 33442. City of Fort Lauderdale City Hall, 100 North Andrews Avenue, Fort..., 115 South Andrews Avenue, Room 409, Fort Lauderdale, FL 33301. Village of Lazy Lake Village Hall, 2250...

  13. Construction of Experimental Roofing.

    DTIC Science & Technology

    1981-11-01

    buildings at Fort Benning, GA; Fort Knox, KY; and Fort Lewis, WA. Sheets of EPDM synthetic rubber were installed on buildings at Forts Benning and Lewis...Contract and Unit Costs 14 5 Polyurethane Foam Roofing -- Initial Physical Properties 28 6 EPDM Sheet Rubber Roofing -- Initial Physical Properties 30 7...the new system. The system selected for Area A was an EPDM synthetic rubber manufactured by Carlisle Tire and Rubber Company. The contract specified

  14. 78 FR 21817 - Amendment of Restricted Area R-6601; Fort A.P. Hill, VA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ...; Airspace Docket No. 12-AEA-7] RIN 2120-AA66 Amendment of Restricted Area R-6601; Fort A.P. Hill, VA AGENCY... limits and time of designation of restricted area R-6601, Fort A.P. Hill, VA. The U.S. Army requested... limits and increase the time of designation of restricted area R-6601, Fort A.P. Hill, VA, (77 FR 35308...

  15. CACDA JIFFY III War Game. Volume II. Methodology

    DTIC Science & Technology

    1980-09-01

    Devens , MA 01433 Commandant USA Air ,Defense School ATTN:’ ATSA-CD-SC-S Fort Bliss, TX 79916 Commandant USA Intelligence Center and School Fort Huachuca...RELEASE: DISTRIBUTION UNLIMITED 0 801030o 033 1 Technical Report TR 6-80, Septenber 1980 US Army Combined Arms Studies and Analysis Activity Fort ...manual war game developed and operated at the USATRADOC Combined Arms Combat Developments Activity (CACDA),, Fort Leavenworth, Kansas, for scenzrio

  16. The Fort Collins Science Center

    USGS Publications Warehouse

    Wilson, Juliette T.; Banowetz, Michele M.

    2012-01-01

    With a focus on biological research, the U.S. Geological Survey Fort Collins Science Center (FORT) develops and disseminates science-based information and tools to support natural resource decision-making. This brochure succinctly describes the integrated science capabilities, products, and services that the FORT science community offers across the disciplines of aquatic systems, ecosystem dynamics, information science, invasive species science, policy analysis and social science assistance, and trust species and habitats.

  17. Co-Phenylcaine Spray: can we improve the taste? A randomised, double-blind, crossover study.

    PubMed

    Bailey, S; Panizza, B; Cabot, P; Wallwork, B

    2018-02-01

    Co-Phenylcaine Forte is a nasal spray routinely prescribed by otolaryngologists in Australia. The taste of Co-Phenylcaine Forte is typically described as unpleasant. This study sought to improve the overall patient experience associated with Co-Phenylcaine Forte by generating a Co-Phenylcaine Forte formulation, referred to as Co-Phenylcaine Zest, which contains an added vanilla flavour and masking agent. Participants were randomised to receive two actuations of Co-Phenylcaine Forte in each nostril followed by two actuations of Co-Phenylcaine Zest, or vice versa. There was a 6-36-hour washout period between each treatment. After the administration of each spray, participants completed a questionnaire to rate various sensory attributes of each formulation on seven-point ordinal scales. Patients reported their overall formulation preference after receiving both treatments. A total of 86 participants completed the trial. Seventy-four per cent of patients preferred Co-Phenylcaine Zest, 21 per cent preferred Co-Phenylcaine Forte and 5 per cent had no preference (p < 0.001). The satisfaction score associated with Co-Phenylcaine Zest was 1.22 points greater than with Co-Phenylcaine Forte (p < 0.001). A novel formulation of Co-Phenylcaine Forte was created by adding a flavour and a masking agent; this formulation was preferred by most patients.

  18. Enabling Disciplined Initiative: An Experiential Lesson

    DTIC Science & Technology

    2016-05-26

    Studies United States Army Command and General Staff College Fort Leavenworth, Kansas 2016 Approved for public release; distribution is...Initiative: An Experiential Lesson 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER MAJ James C...Wiltse 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION

  19. A Victorious Defeat: Mission Command Failure of the 1857-1858 Utah Expedition

    DTIC Science & Technology

    2016-05-26

    States Army School of Advanced Military Studies United States Army Command and General Staff College Fort Leavenworth, Kansas 2016...MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) Advanced Military Studies Program 11. SPONSOR/MONITOR’S REPORT...Director, School of Advanced Military Studies Henry A. Arnold III, COL Accepted this 10th day of May

  20. Biomedical Imaging

    DTIC Science & Technology

    1994-04-01

    distribution unlimited. United States Army Aeromedical Research Laboratory Fort Rucker, Alabama 36362-0577 Qualified recuesters Qualified requesters may...FUNDING NUMBER5 I PROGRAM zfJECT TASK WORK UNIT ELEMENT NO. NO. ACCESSION NO. 62787A 30162787A87$ EA 138 Biomedical Imaging 12. PERSONAL AUTHOR(S...times larger. Usually they are expensive with commercially available units starting at around $100,000. Triangulation sensors are capable of range

  1. BDP Is Unified at the ATRF | Poster

    Cancer.gov

    By Ken Michaels, Staff Writer The Biopharmaceutical Development Program (BDP) at the Frederick National Laboratory is, for the first time ever, in a single building at the Advanced Technology Research Facility (ATRF). At Fort Detrick, BDP operations were spread out in about a dozen buildings, resulting in redundancies in maintaining various utilities (air handlers, clean steam, WFI, etc.) for multiple buildings rather than one.

  2. ICORE '98: Proceedings from the International Conference on Outdoor Recreation and Education (12th, Fort Walton Beach, Florida, October 20-24, 1998).

    ERIC Educational Resources Information Center

    Jones, Rob, Comp.

    This proceedings of a conference on outdoor recreation and education contains conference papers and summaries of presentations and panel sessions. Following a summary of conference activities, the 14 entries are: "Working Together in Outdoor Programming: How Can It Work for You?" (W. T. Taylor, Jim Gilbert, Patsy Kott, Linda…

  3. Manufacturing Methods and Technology Program Plan, CY 1986

    DTIC Science & Technology

    1986-02-01

    Sada Barik ) C: (201) 5 32- 4 035 Fort Monmouth, NJ 07T03 AV: 992-4995 DESCOM U.S. Army Depot Systems Command ATTN: AMSDS-RM-EM (-Mr. Mike Ahearn) C...A.MSETL-PC-SI-I (Mr. Sada Barik ) (-r, ATTN: AMSEL-POD-P-G (Messrs. Feddeler, Esposito, Resnic) Cdt ATTN: RD&E Technical Documents Center PM, 6ITTN: AMCPM

  4. Performance of First-Tour WAC Enlisted Women: Data Base for the Performance Orientation of Women's Basic Training. Final Report.

    ERIC Educational Resources Information Center

    Boyd, H. Alton; And Others

    The introduction of performance-oriented instructional procedures into Women's Basic Training (BT) at Fort McClellan and the revision of Army Training Program 21-121 to incorporate the philosophy and principles of performance-oriented training are described in the document. Results from a questionnaire regarding duties, activities, and attitudes…

  5. Requirements For Security Sector Reform Success

    DTIC Science & Technology

    2016-05-26

    Advanced Military Studies United States Army Command and General Staff College Fort Leavenworth, Kansas 2016 Approved for public release...ACRONYM(S) School of Advanced Military Studies , Advanced Military Studies Program 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12. DISTRIBUTION...political and economic stability are required for Security Sector Reform (SSR) success over the long term. This study suggests that states with stable

  6. Recruiting and Retaining Army Nurses: An Annotated Bibliography

    DTIC Science & Technology

    1988-12-01

    upon earlier research into the relationships among locus of control , organizational unit structure, job satisfaction, and registered nurses’ intentions...R.ctruiting Comma 2 Program Analysis and Evaluation Directorate Research and Studies Division Fort Sheridan, IL 60037-6000 -N --. NAVAL POSTGRADUATE SCHOOL...Monterey, California RADM. R. C. Austin Harrison Shull Superintendent Provost The research summarized herein was sponsored by the US Army Recruiting

  7. SARDA Surface Schedulers

    NASA Technical Reports Server (NTRS)

    Malik, Waqar

    2016-01-01

    Provide an overview of algorithms used in SARDA (Spot and Runway Departure Advisor) HITL (Human-in-the-Loop) simulation for Dallas Fort-Worth International Airport and Charlotte Douglas International airport. Outline a multi-objective dynamic programming (DP) based algorithm that finds the exact solution to the single runway scheduling (SRS) problem, and discuss heuristics to restrict the search space for the DP based algorithm and provide improvements.

  8. Science, Technology & Requirements Forum

    DTIC Science & Technology

    2012-10-01

    Science, Technology & Requirements Forum COL Barry K. Williams Assistant Commandant US Army Engineer School Engineer Warriors leading to...2012 4. TITLE AND SUBTITLE Science, Technology & Requirements Forum 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S...unlimited 13. SUPPLEMENTARY NOTES Presented at the 2012 Science, Technology & Requirements Forum held 17-18 October in Fort Leonard Wood, MO. 14

  9. "Blending" Docent Learning: Using Google Forms Quizzes to Increase Efficiency in Interpreter Education at Fort Henry

    ERIC Educational Resources Information Center

    Murphy, Michael P. A.

    2018-01-01

    The introduction of online elements to museums and cultural sites has opened up new ways for visitors to engage with the past, with nature, with culture, and all other treasures of the museum. However, docent training has lagged behind visitor-facing educational initiatives. By blending online elements into docent education programs, staff…

  10. Test wells T23, T29, and T30, White Sands Missile Range and Fort Bliss Military Reservation, Dona Ana County, New Mexico

    USGS Publications Warehouse

    Myers, R.G.; Pinckley, K.M.

    1984-01-01

    Three test wells, T23, T29, and T30, were drilled in south-central New Mexico as part of a joint military training program sponsored by the U.S. Army in November 1982. Test well T23 was drilled as an exploratory and monitoring well in the proposed Soledad well field at the Fort Bliss Military Reservation. Test wells T29 and T30 were drilled at White Sands Missile Range. Test well T29 was drilled as an observation well in the vicinity of the outfall channel from the sewage treatment plant. Test well T30 was drilled as an observation well for a landfill south of the well site. Information obtained from these wells includes lithologic logs for all wells and borehole-geophysical logs from the cased wells for test wells T29 and T30. (USGS)

  11. Site Plan: Master Plan, Fort Custer, Michigan, Reservation Boundary and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan: Master Plan, Fort Custer, Michigan, Reservation Boundary and Land Use Map. USACOE, 31 December 1954 - Fort Custer Military Reservation, Bounded by Territorial, Dickman, & Longman Roads & Route 94 Business, Battle Creek, Calhoun County, MI

  12. 77 FR 48060 - Establishment of Class E Airspace; Fort Morgan, CO

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ...-4517. SUPPLEMENTARY INFORMATION: History On June 7, 2012, the FAA published in the Federal Register a... or more above the surface of the earth. * * * * * ANM CO E5 Fort Morgan, CO [New] Fort Morgan...

  13. 33 CFR 110.155 - Port of New York.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 915 yards from the Fort Lee flagpole) on a line ranging approximately 100°22′ from the Fort Lee... said line ranging between the Fort Lee flagpole and the square chimney on the Medical Center Building...

  14. 33 CFR 110.155 - Port of New York.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 915 yards from the Fort Lee flagpole) on a line ranging approximately 100°22′ from the Fort Lee... said line ranging between the Fort Lee flagpole and the square chimney on the Medical Center Building...

  15. Operational Art in Pontiac’s War

    DTIC Science & Technology

    2015-05-23

    and Fort Presque Isle lay along the supply route connecting Fort Pitt over land to Lake Erie further linking across the water to major forts through...expedition in early August. Traveling south along the coast of Lake Erie , Bradstreet first stopped at Presque Isle . Bradstreet was hesitant to initiate...destroyed Fort Presque Isle . The next stop was Sandusky Bay, where Dalyell took some men several miles inland to rout Huron warriors from the village of

  16. Human Factors Research in Aircrew Performance and Training

    DTIC Science & Technology

    1986-11-01

    at Fort Devens , Massachusetts. During the evaluation, the project director observed the techniques used by the team members to assess specific...Szabo, Editors Anacapa Sciences, Inc. for ARI Field Unit at Fort Rucker, Alabama Charles A. Gainer, Chief 4-. TRAINING RESEARCH LABORATORY Jack H...DATE ARI Field Unit at Fort Rucker, Alabama November 1986 P.O. Box 489; Fort Rucker, AL 36362 22. NUMBEROrPAGES 2,2 14. MONITORING AGENCY NAME & ADDRESS

  17. No Further Action Decision Under CERCLA, Study Area 43B, Historic Gas Station Sites, Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    I U.S. Army EnvironmentalCenter NO FURTHER ACTION DECISION UNDER CERCLA * STUDY AREA 43B HISTORIC GAS STATION SITES U FORT DEVENS , MASSACHUSETTS I I... FORT DEVENS , MASSACHUSETTS I I i * Prepared for: U.S. Army Environmental Center Aberdeen Proving Ground, Maryland Contract DAAA15-91-0008 I Prepared...HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS TABLE OF CONTENTS Section Title Page No. EXECUTIVE SUMMARY

  18. CACDA Jiffy War Game Technical Manual. Part 1: Methodology

    DTIC Science & Technology

    1977-03-01

    Systems Analysis Office (Mr Tyburski) Fort Monmout’.h, NJ 07703 Commander 1* USAISD ATTN: ATISE-TD-TS-CD (LT Boyer) Fort Deven , MASS 01433 Commander 2...Developments Activity Fort Leavenworth, Kansas 66027 CACDA JIFFY WAR GAME TECHNICAL MANUAL Part 1: Methodology by Timothy J. Bailey and Gerald A. Martin ACN...ComrbatDevelopments Activity (CACDA), Fort Leavenworth,i-Xsas," for scenario devel- opment and force structure evaluation. The Jiffy Game computer

  19. Hydrogeologic investigations by the U.S. Geological Survey at the former Fort Benjamin Harrison, Marion County, Indiana

    USGS Publications Warehouse

    Risch, Martin R.

    1999-01-01

    As part of the U.S. Department of Defense Base Realignment and Closure process, the former Fort Benjamin Harrison in Marion County, Indiana (called 'Fort Harrison' in this fact sheet), was placed on the Base Closure List in 1991. Property disposal and reuse activities began when Fort Harrison was decommissioned in 1995; work continues through 1999. Fort Harrison was located on approximately 2,500 acres about 10 miles northeast of downtown Indianapolis, Ind., in the City of Lawrence (fig. 1). Since 1903, the installation served as a major training facility that at times included schools, a hospital, and Army Finance and Soldier Support Centers. In 1996, the Army leased 1,700 acres of woodland and recreational facilities to the Indiana Department of Natural Resources as Fort Harrison State Park. Another 550 acres became privately owned for industrial, commercial, and residential purposes.

  20. 1. NORTHWEST OBLIQUE AERIAL VIEW OF FORT DELAWARE AND PEA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. NORTHWEST OBLIQUE AERIAL VIEW OF FORT DELAWARE AND PEA PATCH ISLAND. REMAINS OF SEA WALL VISIBLE IN FOREGROUND AND RIGHT OF IMAGE. - Fort Delaware, Sea Wall, Pea Patch Island, Delaware City, New Castle County, DE

  1. Photocopy of War Department drawing (original located at Fort Belvoir, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort Belvoir, Virginia). PLAN, DETAILS & ELECTRICAL, DRAWING NUMBER 1100-695 - Fort McCoy, Building No. T-1034, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI

  2. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLANS & ELEVATIONS, PLAN NUMBER 800-451 - Fort McCoy, Building No. T-1004, South Side of Eleventh Avenue, Block 10, Sparta, Monroe County, WI

  3. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). ELEVATIONS, PLAN NUMBER 1100-661 - Fort McCoy, Building No. T-1039, North side of Tenth Avenue, Block 10, Sparta, Monroe County, WI

  4. 5. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). ELEVATIONS & DETAILS, PLAN NUMBER 700-1518 - Fort McCoy, Building No. T-10111, Southeast of Auxiliary Boiler House, Block 10, Sparta, Monroe County, WI

  5. A Study of the Delivery of Adult Walk-In Primary Care at Womack Army Hospital, Fort Bragg, North Carolina

    DTIC Science & Technology

    1980-05-01

    patients have begun arriving, they start out behind and they continue to get further behind as the morning progresses. This factor was brought to the...program and give a false indication of the actual time that paients had to spend in the AMOSIST program to get definitive care. It can be seen in...AMOSISTs in the AMIC. In the mornings, when the arrival rate and the patient load are the heaviest, there was a tendency for the physician to get somewhat

  6. Modifying and Testing ATC Controller Interface (CI) for Data Link Clearances

    NASA Technical Reports Server (NTRS)

    2001-01-01

    The Controller-Pilot Data Link Communications (CPDLC) and Air Traffic Control workstation research was conducted as part of the 1997 NASA Low Visibility Landing and Surface Operations (LVLASO) demonstration program at Atlanta Hartsfield airport. Research activity under this grant increased the sophistication of the Controllers' Communication and Situational Awareness Terminal (C-CAST) and developed a VHF Data Link -Mode 2 communications platform. The research culminated with participation in the 2000 NASA Aviation Safety Program's Synthetic Vision System (SVS) / Runway Incursion Prevention System (RIPS) flight demonstration at Dallas-Fort Worth Airport.

  7. Engineer. The Professional Bulletin of Army Engineers. Volume 44. January-April 2014

    DTIC Science & Technology

    2014-04-01

    Building 3201,Suite 2661,Fort Leonard Wood ,MO,65473-8702 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES...and the Maneuver Support Center of Excellence G-37 Publications, Fort Leonard Wood , Missouri. Periodicals postage is paid at Fort Leonard Wood and...manuscript to Engineer Professional Bulletin, 14010 MSCoE Loop, Building 3201, Suite 2661, Fort Leonard Wood , MO 65473-8702. Due to the limited space per

  8. An Evaluation of Food Service Systems at Fort Myer, Bolling Air Force Base and Fort Benjamin Harrison

    DTIC Science & Technology

    1974-09-01

    A comparative evaluation of the food service operations at Fort Myer, Virginia; Bolling Air Force Base, Maryland; and Fort Benjamin Harrison, Indiana...was conducted. These three bases each represent different types of food service systems, which are respectively: contract provided food and labor...Operations Research and Systems Analysis Office had the responsibility for comparing the costs, nutritional aspects and consumer attitudes involved in these three different systems of food service .

  9. No Further Action Decision Under CERCLA Study Area 43N Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    SITES FORT DEVENS , MASSACHUSETTS CONTRACT DAAA15-91-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING GROUND, MARYLAND JANUARY 1995 PRINTED ON...HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS I . Prepared for: U.S. Army Environmental Center Aberdeen Proving Ground, Maryland Contract DAAA15-91...DECISION UNDER CERCLA STUDY AREA 43N HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS 3 TABLE OF CONTENTS U Section Title Page No. EXECUTIVE SUMMARY

  10. No Further Action Decision Under CERCLA Study 43R Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    in accordance with the same. E Date RAC Environmental Coordinator m U.S. ENVIRONMENTAL PROTECTION AGENCY JAMES P. BYRý% Date Fort Devens Remedial...CERCLA STUDY AREA 43R HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS CONTRACT DAAA15-91-D-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING...ACTION DECISION UNDER CERCLA STUDY AREA 43R HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS I * Prepared for: U.S. Army Environmental Center

  11. Fort McClellan, ammunition storage building 4404. Planar view of rear ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Fort McClellan, ammunition storage building 4404. Planar view of rear (west) side, view towards the east northeast without scale - Fort McClellan Ammunition Storage Area, Building No. 4404, Second Avenue (Magazine Road), Anniston, Calhoun County, AL

  12. Officers quarters along Fort Warren Avenue, with building 94 at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Officers quarters along Fort Warren Avenue, with building 94 at left foreground and, left to right, buildings 96 through 110 in background. View to northeast. - Fort David A. Russell, Randall Avenue west of First Street, Cheyenne, Laramie County, WY

  13. 8. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FLOOR PLAN, PLAN NUMBER 800-1514 - Fort McCoy, Building No. T-1032, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI

  14. Photocopy of War Department (original located at Fort McCoy, Wisconsin) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department (original located at Fort McCoy, Wisconsin) FOUNDATION, FRAMING & FLOOR PLANS, PLAN NUMBER 1100-660 - Fort McCoy, Building No. T-1039, North side of Tenth Avenue, Block 10, Sparta, Monroe County, WI

  15. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLANS & ELEVATIONS, DRAWING NUMBER T.O. 700-6003 - Fort McCoy, Building No. T-10124, South of South Eighth Avenue, Block 10, Sparta, Monroe County, WI

  16. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLAN & ELEVATIONS, PLAN NUMBER 1100-670 - Fort McCoy, Building No. T-1068, North side of South Ninth Avenue, Block 10, Sparta, Monroe County, WI

  17. 12. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). ELEVATIONS, PLAN NUMBER 700-1277 - Fort McCoy, Building No. T-101, 400' North of intersection of East & West Headquarters Roads, Sparta, Monroe County, WI

  18. 6. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLANS, ELEVATIONS & SECTIONS, PLAN NUMBER 800-1432 - Fort McCoy, Building No. T-656, Intersection of East Twelfth Avenue & South "O" Street, Sparta, Monroe County, WI

  19. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLAN & ELEVATIONS, PLAN NUMBER 800-1418 - Fort McCoy, Building No. T-1010, South Side of South Eleventh Street, Block 10, Sparta, Monroe County, WI

  20. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin), PLANS & ELEVATIONS, PLAN NUMBER 1100-665 - Fort McCoy, Building No. T-1025, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI

  1. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLANS, ELEVATIONS & SECTIONS, PLAN NUMBER 800-1445 - Fort McCoy, Building No. T-1001, South Side of Eleventh Avenue, Block 10, Sparta, Monroe County, WI

  2. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FLOOR PLAN & ELEVATIONS, PLAN NUMBER 700-484 - Fort McCoy, Building No. T-1003, South Side of Eleventh Avenue, Block 10, Sparta, Monroe County, WI

  3. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLANS, ELEVATIONS, & SECTION, PLAN NUMBER 800-459 - Fort McCoy, Building No. T-10118, North side of South Eighth Avenue, Block 10, Sparta, Monroe County, WI

  4. 5. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin) FLOOR PLAN & ELEVATIONS, PLAN NUMBER 700-438 - Fort McCoy, Building No. T-1054, South side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI

  5. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FRAMING ELEVATIONS & SECTIONS, PLAN NUMBER 800-1532 - Fort McCoy, Building No. T-1005, South Side of South Eleventh Avenue, Block 10, Sparta, Monroe County, WI

  6. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin) FLOOR PLAN & ELEVATIONS, PLAN NUMBER 700-463 - Fort McCoy, Building No. T-1022, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI

  7. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin) FLOOR PLAN & ELEVATIONS, PLAN NUMBER 700-1240 - Fort McCoy, Building No. T-1006, South Side of South Eleventh Avenue, Block 10, Sparta, Monroe County, WI

  8. 9. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). ELEVATIONS & SECTIONS, PLAN NUMBER 800-1515 - Fort McCoy, Building No. T-1032, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI

  9. 4. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLAN, ELEVATIONS, & DETAILS, PLAN NUMBER 700-1517 - Fort McCoy, Building No. T-10111, Southeast of Auxiliary Boiler House, Block 10, Sparta, Monroe County, WI

  10. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin), FLOOR PLAN & ELEVATIONS, PLAN NUMBER 700-462 - Fort McCoy, Building No. T-1027, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI

  11. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin), ELEVATIONS & SECTIONS, PLAN NUMBER 800-1413 - Fort McCoy, Building No. T-1055, South side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI

  12. 8. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FRAMING ELEVATION & SECTION, PLAN NUMBER 1497 - Fort McCoy, Building No. T-1033, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI

  13. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FLOOR PLANS & DETAILS, PLAN NUMBER 800-1531 - Fort McCoy, Building No. T-1005, South Side of South Eleventh Avenue, Block 10, Sparta, Monroe County, WI

  14. Hydrogeology of the Cascade Springs area near Tullahoma, Tennessee

    USGS Publications Warehouse

    Johnson, S.E.

    1995-01-01

    The ground-water-flow system contributing to Cascade Springs near Tullahoma, Tennessee, was investigated from September 1991 to May 1992. Cascade Springs, consisting of Left Cascade and Right Cascade Springs, are located on the escarpment of the Highland Rim and discharge immediately above the Chattanooga Shale from the cherty Fort Payne Formation. Left Cascade Spring is the sole source of water for the Town of Wartrace and for a local whiskey distillery. Two major aquifers, the Manchester and the Fort Payne aquifers, contribute ground-water flow to Cascade Springs. The Manchester aquifer is composed of unconsolidated chert gravel with minimal clay content and the upper, well- fractured interval of the Fort Payne Formation. The Fort Payne aquifer consists of dense, bedded, cherty limestone with few fractures. Where present, the fractures of the Fort Payne aquifer are concentrated immediately above the Chattanooga Shale along horizontal bedding planes. The Manchester and the Fort Payne aquifers are hydraulically connected. However, the dense cherty limestone of the Fort Payne Formation, where unfractured, can impede the downward flow of ground water from the Manchester aquifer. Near the Highland Rime escarpment, as a result of this local confinement, the potentiometric head of wells completed in the Manchester aquifer is 36- to 80-feet higher than the head of wells completed in the Fort Payne aquifer. The primary recharge area for Cascade Springs is located southeast of the springs. The estimated recharge area for the Manchester aquifer encompaasses approximately 1 square mile. The lateral extent of the recharge area for the Fort Payne aquifer cannot be delineated because few wells completed in the Fort Payne aquifer are located southeast of Cascade Springs. The water quality of Left Cascade Spring is dominated by calcium and bicarbonate ions with low concentrations of inorganic constituents and dissolved solids. Two volatile organic compounds (1.3 micrograms per liter of 1,2-transdichloroethene and 0.2 micrograms per liter of trichloroethylene) were detected in a recent analysis of water from Left Casade Spring.

  15. Calcium vitamin D3 supplementation in clinical practice: side effect and satisfaction.

    PubMed

    Sanaei, Maryam; Banasiri, Mohammad; Shafiee, Gita; Rostami, Mahsa; Alizad, Saba; Ebrahimi, Mehdi; Larijani, Bagher; Heshmat, Ramin

    2015-01-01

    The objective of this study was to assess side effects and satisfaction about OsteoCalVitFort (500 mg calcium and 400 I.U. of vitamin D3) usage. A total 186 people were participated with range age from 18 to 65 years old. Each participant received 1 pack that contains 60 OsteoCalVitFort tablet and used two tablet OsteoCalVitFort daily (1 tablet after breakfast and 1 after dinner). By a phone call, side effects and satisfaction about OsteoCalVitFort were assessed. The rate of constipating (8.0 %) and bloating (12.5 %) were decreased significantly after OsteoCalVitFort supplement intake (1.2 %, and 0.6 %, respectively). Similar results were observed in metallic taste in mouth, tiredness, weakness, loss of appetite, bone/muscle pain and mental/mood change after Calcium Vitamin D3 supplementation intake. Totally, 94 % of patients were satisfied about OsteoCalVitFort usage. The results of the research indicate despite the high quality of OsteoCalVitFort supplement, there are no side effects which have been seen in other supplements.

  16. D-X Payload Ready For Flight

    NASA Image and Video Library

    2017-12-08

    Matthew Mullin and Bobby Meazell, Orbital ATK/Columbia Scientific Balloon Facility technicians, conduct compatibility testing on NASA Langley Research Center’s Radiation Dosimetry Experiment payload Wednesday, Sept. 9, at Fort Sumner, N.M. The successful compatibility test was a key milestone in ensuring the flight readiness of RaD-X, which is scheduled to launch on an 11-million-cubic-foot NASA scientific balloon no earlier than Friday, Sept. 11, from the agency’s balloon launching facility in Fort Sumner. RaD-X will measure cosmic ray energy at two separate altitude regions in the stratosphere—above 110,000 feet and between 69,000 to 88,500 feet. The data is key to confirming Langley’s Nowcast of Atmospheric Ionizing Radiation for Aviation Safety (NAIRAS) model, which is a physics-based model that determines solar radiation and galactic cosmic ray exposure globally in real-time. The NAIRAS modeling tool will be used to help enhance aircraft safety as well as safety procedures for the International Space Station. In addition to the primary payload, 100 small student experiments will fly on the RaD-X mission as part of the Cubes in Space program. The program provides 11- to 18-year-old middle and high school students a no-cost opportunity to design and compete to launch an experiment into space or into the near-space environment. The cubes measure just 4 centimeters by 4 centimeters. NASA’s scientific balloons offer low-cost, near-space access for scientific payloads weighing up to 8,000 pounds for conducting scientific investigations in fields such as astrophysics, heliophysics and atmospheric research. NASA’s Wallops Flight Facility in Virginia manages the agency’s scientific balloon program with 10 to 15 flights each year from launch sites worldwide. Orbital ATK provides program management, mission planning, engineering services and field operations for NASA’s scientific balloon program. The program is executed from the Columbia Scientific Balloon Facility in Palestine, Texas. The Columbia team has launched more than 1,700 scientific balloons in over 35 years of operation. Anyone may track the progress of the Fort Sumner flights, which includes a map showing the balloon’s real-time location, at: towerfts.csbf.nasa.gov/ For more information on the balloon program, see: www.nasa.gov/scientificballoons NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  17. 25. Photocopy of photograph (from Division of Beaches and Parks, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Photocopy of photograph (from Division of Beaches and Parks, State of California, Department of Natural REsources) Photographer unknown, Date unknown SUTTER'S MAP OF FORT WITH SUPERIMPOSED OUTLINE OF FORT - Sutter's Fort, L & Twenty-Seventh Streets, Sacramento, Sacramento County, CA

  18. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin) FOUNDATION, FRAMING & FLOOR PLANS, PLAN NUMBER 800-1412 - Fort McCoy, Building No. T-1055, South side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI

  19. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FLOOR & FRAMING PLANS, PLAN NUMBER 700-1204 - Fort McCoy, Building No. T-1088, Intersection of South Ninth & South Eighth Avenues, Block 10, Sparta, Monroe County, WI

  20. 11. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). SECOND FLOOR PLAN, PLAN NUMBER 700-1276 - Fort McCoy, Building No. T-101, 400' North of intersection of East & West Headquarters Roads, Sparta, Monroe County, WI

  1. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin), PLANS & ELEVATIONS, PLAN NUMBER 800-1541 - Fort McCoy, Building No. T-10122, Southeast corner of South Eighth Avenue & South "X" Street, Block 10, Sparta, Monroe County, WI

  2. 10. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FIRST FLOOR PLAN, PLAN NUMBER 700-1275 - Fort McCoy, Building No. T-101, 400' North of intersection of East & West Headquarters Roads, Sparta, Monroe County, WI

  3. 6. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FRAMING PLANS & DETAILS, PLAN NUMBER 800-317 - Fort McCoy, Building No. T-453, East Twelfth Street, midway between East "J" & East "K" Streets, Sparta, Monroe County, WI

  4. Copy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Copy of War Department drawing (original located at Fort McCoy, Wisconsin). PLANS, ELEVATIONS, DETAILS, SECTIONS, PLAN NUMBER 700-465 - Fort McCoy, Building No. T-10110, South side of South Eighth Avenue, Block 10, Sparta, Monroe County, WI

  5. 7. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLANS & FRAMING ELEVATIONS, PLAN NUMBER 800-318 - Fort McCoy, Building No. T-453, East Twelfth Street, midway between East "J" & East "K" Streets, Sparta, Monroe County, WI

  6. 6. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin) FLOOR & CEILING PLANS AND DETAILS, PLAN NUMBER 800-1520 - Fort McCoy, Building No. T-1031, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI

  7. 7. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin) FRAMING ELEVATION, SECTIONS & DETAILS, PLAN NUMBER 800-1521 - Fort McCoy, Building No. T-1031, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI

  8. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FRAMING ELEVATIONS, SECTIONS & DETAILS, PLAN NUMBER 800-1538 - Fort McCoy, Building No. T-1081, North side of South Ninth Avenue, Block 10, Sparta, Monroe County, WI

  9. 6. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLANS, ELEVATIONS & SECTIONS, PLAN NUMBER 800-847 - Fort McCoy, Building No. T-1106, South "R" Street, midway between South Eleventh & South Tenth Avenues, Sparta, Monroe County, WI

  10. 7. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FLOOR PLAN & ROOF FRAMING PLAN, PLAN NUMBER 1496 - Fort McCoy, Building No. T-1033, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI

  11. 13. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). WALL SECTIONS, DANCE HALL, PLAN NUMBER 700-1278 - Fort McCoy, Building No. T-101, 400' North of intersection of East & West Headquarters Roads, Sparta, Monroe County, WI

  12. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FLOOR PLANS, SCHEDULES & DETAILS, PLAN NUMBER 800-1537 - Fort McCoy, Building No. T-1081, North side of South Ninth Avenue, Block 10, Sparta, Monroe County, WI

  13. Fort Collins Science Center

    USGS Publications Warehouse

    Banowetz, Michele

    2004-01-01

    FORT serves all Department of the Interior land management bureaus and other natural resource agencies. In addition, FORT scientists partner with DOI and other federal entities such as CDC, DOE, EPA, NASA, NIH, and USDA to share expertise and resources. FORT also partners with several universities and works cooperatively with states and nongovernmental organizations. Products and services include reports and publications, predictive models and software, maps and GIS products, and other technical assistance in the form of meetings, workshops, training, field visits, and needs assessments.

  14. Fort Hood Army Internal Review Team: Final Report

    DTIC Science & Technology

    2010-08-04

    Report Date l August 4, 2010 Protecting our Army community at home & abroad Army Internal Review Team : Final Report Report Documentation Page Form...DATES COVERED 00-00-2010 to 00-00-2010 4. TITLE AND SUBTITLE Fort Hood Army Internal Review Team : Final Report 5a. CONTRACT NUMBER 5b. GRANT...Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 FoRt Hood Army Internal Review team : Final Report August 4, 2010 1 FoRt Hood Army

  15. The geology and mechanics of formation of the Fort Rock Dome, Yavapai County, Arizona

    USGS Publications Warehouse

    Fuis, Gary S.

    1996-01-01

    The Fort Rock Dome, a craterlike structure in northern Arizona, is the erosional product of a circular domal uplift associated with a Precambrian shear zone exposed within the crater and with Tertiary volcanism. A section of Precambrian to Quaternary rocks is described, and two Tertiary units, the Crater Pasture Formation and the Fort Rock Creek Rhyodacite, are named. A mathematical model of the doming process is developed that is consistent with the history of the Fort Rock Dome.

  16. No Further Action Decision Under CERCLA, Study Area 14, Landfill No. 10, Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    I I I U.S. ArmyEnvironmentalCenter NO FURTHER ACTION DECISION UNDER 5 CERCLA * STUDY AREA 14 LANDFILL NO. 10 U FORT DEVENS , MASSACHUSETTS CONTRACT...45, 1 Feb 93 replaces THAMA Form 45 which is obsolete. U 1I NO FURTHER ACTION DECISION UNDER CERCLA STUDY AREA 14 LANDFILL NO. 10 3 FORT DEVENS ... FORT DEVENS , MASSACHUSETTS 3 TABLE OF CONTENTS Section Title Page No. EXECUTIVE SUMMARY ......................................... ES-1 I 1.0

  17. Fort Devens AAF, Massachusetts. Revised Uniform Summary of Surface Weather Observations (RUSSWO)

    DTIC Science & Technology

    1977-04-07

    uaay oI Surlace Weatherj .>jObservations (RUSSWO) - Fort Devens AAL’, al 6.PRFOMIG.REOTNMR t- iassachusett s 6 EFRIGO EOTNME 7. AUTNOR(o) S. CONTRACT...for Fort Devens AAP, M’assachusetts contains the following parts: (A) heather Conditions; Atmospheric e-henoinena; (B) Precipitation, Snowfall and Snow...SEUIYCLASSIFICATION OF THIS PAGE (nohn Data Entered) %- - - - - .~~ -V- 2, SECURITY CLASSIFICATION OF THIS PAGE(W4 Dat. Rnteted) 19. ** Fort Devens AAF, M’ass4

  18. No Further Action Decision Under CERCLA Study Area 43Q Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    the same. ,J ES C. CHAMBERS Date RAC Environmental Coordinator I U.S. ENVIRONMENTAL PROTECTION AGENCY -t JAMES P. BYR4 Date3 Fort Devens Refiedial...CERCLA STUDY AREA 43Q HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS , CONTRACT DAAA15-91-D-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING...ACTION DECISION UNDER CERCLA STUDY AREA 43Q HISTORIC GAS STATION SITES 5 FORT DEVENS , MASSACHUSETTS V a I i Prepared for: U.S. Army Environmental Center

  19. No Further Action Decision Under CERCLA Study Area 43K Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    with the same. AMES C. CHAMBERS Date RAC Environmental Coordinator U.S. ENVIRONMENTAL PROTECTION AGENCY JAMES P. BYRNE Date Fort Devens l(emedial...STATION SITES FORT DEVENS , MASSACHUSETTS CONTRACT DAAA15-91-D-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING GROUND, MARYLAND JANUARY 1995 PRINTED ON...Distribution Unlimited U.S. ArmyEnvironmentalCenter NO FURTHER ACTION DECISION UNDER CERCLA STUDY AREA 43K HISTORIC GAS STATION SITES FORT DEVENS ,9

  20. No Further Action Decision Under CERCLA Study Area 43L Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    AES C. CHAMBERS Date RAC Environmental Coordinator U.S. ENVIRONMENTAL PROTECTION AGENCY JAMES P. BY/NE ) Date Fort Devens Remedial Project Manager...CERCLA STUDY AREA 43L HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS CONTRACT DAAA15-91-D-0008 U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING...DECISION UNDER CERCLA STUDY AREA 43L HISTORIC GAS STATION SITES ! FORT DEVENS , MASSACHUSETTS I I I 5 Prepared for: U.S. Army Environmental Center I

  1. No Further Action Decision Under CERCLA, Study Area 31, Moore Army Airfield Fire Fighting Training Area, Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    FURTHER ACTION DECISION UNDER CERCLAI STUDY AREA 31 MOORE ARMY AIRFIELD FIRE FIGHTING TRAINING AREA FORT DEVENS , MASSACHUSETFS TABLE OF CONTENTS jSection...Inc. 31DD.DOC 6917.11 111,, NO FURTHER ACTION DECISION UNDER CERCLA I STUDY AREA 31 MOORE ARMY AIRFIELD FIRE FIGHTING TRAINING AREA 3 FORT DEVENS ...Fire Fighting Training Area) at Fort Devens , Massachusetts, have resulted in the decision that no further studies or remediation are required at this

  2. Feasibility Study Report for Unsaturated Soils at the Maintenance Yards (Areas of Contamination 44 and 52) Fort Devens

    DTIC Science & Technology

    1994-01-01

    remedial action , location, or other I circumstance at the Fort Devens site. All jurisdictional prerequisites must be met...contaminant, remedial action , location, or other circumstance at Fort Devens , but address problems or situations sufficiently similar to those encountered at... action objectives have been achieved.I I Ft Devens 6917.10 TABLE6-1 /I I I I (Continued) 3 TABLE 6-1 EVALUATION CRITERIA 3 AOCs 44 AND 52 SOILS FORT

  3. Determination of the Optimal Feasible Method of Providing Primary Medical Care to the Active Duty Soldier at Fort Carson, Colorado

    DTIC Science & Technology

    1984-07-01

    1bid., LTC Johnson. 8Curtis L. Bentz , MAJ ( P ), MSC, Chief, Patient Administration Division, U.S. Army Community Hospital, Fort Carson, Colorado...Interview with MAJ ( P ) Curtis L. Bentz , Chief, Patient Administration Division, U.S. Army Community Hospital, Fort Carson, at Fort Carson, 6 December...Fulfillment of the Requirements for the Degree of Master of Health Administration V By William M. Billingsley D IIC Captain, MSC ELE E I June 1984 90 Oo

  4. How Do Le Fort-Type Fractures Present in a Pediatric Cohort?

    PubMed

    Macmillan, Alexandra; Lopez, Joseph; Luck, J D; Faateh, Muhammad; Manson, Paul; Dorafshar, Amir H

    2018-05-01

    Le Fort-type fractures are very rare in children, and there is a paucity of literature presenting their frequency and characteristics. The purpose of this study was to determine the etiology, frequency, and fracture patterns of children with severe facial trauma associated with pterygoid plate fractures in a pediatric cohort. We performed a retrospective cohort study of all children aged younger than 16 years with pterygoid plate and facial fractures who presented to our institute between 1990 and 2010. Patient charts and radiologic records were reviewed for demographic and fracture characteristics. Patients were categorized into 2 groups as per facial fracture pattern: non-Le Fort-type fractures (group A) and Le Fort-type fractures (group B). Other variables including dentition age, frontal sinus development, mechanism of injury, injury severity, and concomitant injuries were recorded. Univariate methods were used to compare groups. We identified 24 children; 25% were girls, and 20.8% were of nonwhite race. Most presented with Le Fort-type fracture patterns (group B, 66.7%). Age was significantly different between group A and group B (mean, 5.9 years and 9.9 years, respectively; P = .009). No significant differences in Injury Severity Score, rate of operative repair, and length of stay were found between groups. Most children with severe facial fractures and pterygoid plate fractures presented with Le Fort-type fracture patterns in our cohort. The mean age of children with Le Fort-type fractures was greater than in those with non-Le Fort-type patterns. However, Le Fort-type fractures did occur in younger children with deciduous and mixed dentition. Copyright © 2017 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.

  5. Endangered, threatened, and sensitive plants of Fort Lewis, Washington: distribution, mapping, and management recommendations for species conservation.

    Treesearch

    T.B. Thomas; A.B. Carey

    1996-01-01

    The loss of native species and their habitats has increased with urban development, agriculture, and resource utilization. According to the Washington Natural Heritage Program, 20 plants listed as endangered, threatened, or sensitive are suspected to occur on the glacial outwash soils of south Puget Sound. In our study, more than 3,000 ha of prairie, wetland, and moist...

  6. Being Part of a People: Ridgeview Classical Schools and Civic Education. AEI Program on American Citizenship. Policy Brief 16

    ERIC Educational Resources Information Center

    Gonch, William

    2014-01-01

    This policy brief is the sixth in a series of in-depth case studies exploring how top-performing charter schools have incorporated civic learning in their school curriculum and school culture. The brief reports on Ridgeview Classical Schools, an integrated K-12 public charter school in Fort Collins, Colorado. The school contains an elementary,…

  7. The Biocompatibility and Bioactivity of Biodentine in Contact with Cementoblast Cells

    DTIC Science & Technology

    2016-07-18

    REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY UNITED STATES ARMY DENTAL ACTIVITY ADVANCED EDUCATION PROGRAM IN ENDODONTICS 228... Activity , Department of Endodontics, Fort Gordon, GA 30905. E-mail address:kimberly.w.lindsey.mil@mail.mil The Biocompatibility and Bioactivity of...biocompatibility towards surrounding tissues (3,4,5). Additionally , it possesses good antimicrobial activity (6), in part related to the significant release of

  8. Defense Infrastructure: The Enhanced Use Lease Program Requires Management Attention

    DTIC Science & Technology

    2011-06-01

    included in our EUL case studies, the escrow agreements executed by the Army in connection with the EUL at Yuma Proving Ground , Arizona, and the EUL at...research park. 6 Army Redstone Arsenal, Alabama 2009 50 468 acres Site for office and research center development. 7 Army Yuma Proving Ground ...9The three Army EUL case studies were located at Aberdeen Proving Ground , Maryland; Fort

  9. Long term acroecosystem research in the Southern Plains

    Treesearch

    Jean L. Steiner; Patrick J. Starks; Jurgen Garbrecht; Daniel Moriasi; Paul Bartholomew; Jim Neel; Kenneth E. Turner; Brian Northup

    2016-01-01

    The Southern Plains (SP) site of the Long Term Agroecosystem Research (LTAR) network is headquartered at the USDA-ARS Grazinglands Research Laboratory (GRL) in El Reno, Oklahoma. The GRL was established in 1948. A long-term watershed and climate research program was established in the Little Washita River Experimental Watershed (LWREW) in 1961 and in the Fort Cobb...

  10. Personal Reflection: "Joy Ride" with SoTL Practice: The Investigation of the Effectiveness of Assistive Technology Course Contents on Student Learning

    ERIC Educational Resources Information Center

    Cho, Jeong il

    2012-01-01

    This reflection is based on my project that investigated the impact of new course content on student learning of basic knowledge and attitudes toward various assistive technology (AT) devices and services using multiple measures in an introductory-level course in a special education program at Indiana University-Purdue University Fort Wayne.…

  11. Prostate Cancer Clinical Consortium Clinical Research Site: Targeted Therapies

    DTIC Science & Technology

    2017-10-01

    AWARD NUMBER: W81XWH-14-2-0159 TITLE: Prostate Cancer Clinical Consortium Clinical Research Site: Targeted Therapies PRINCIPAL INVESTIGATOR...Annual PREPARED FOR: U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland 21702-5012 DISTRIBUTION STATEMENT: Approved for...AND SUBTITLE Prostate Cancer Clinical Consortium Clinical Research Site: Targeted Therapies 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT

  12. Nutritional Needs in Hot Environments-Applications for Military Personnel in Field Operations

    DTIC Science & Technology

    1993-04-01

    other official documentation. Human subjects who participated in studies described in those chapters gave their free and informed voluntary consent...Hopkins University School of Hygiene and Public Health, Baltimore, Maryland JOEL A. GRINKER, Program in Human Nutrition, School of Public Health...of Food Science and Human Nutrition, Colorado State University, Fort Collins GILBERT LEVEILLE, Nabisco Brands Incorporated, East Hanover, New Jersey

  13. Iraqi Population Displacement Analysis

    DTIC Science & Technology

    2016-11-01

    CENTER FOR ARMY ANALYSIS 6001 GOETHALS ROAD FORT BELVOIR, VA 22060-5230 CAA-2015098 IRAQI POPULATION DISPLACEMENT ANALYSIS NOVEMBER 2016...CONTRACT NUMBER Iraqi Population Displacement Analysis PDMC 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER Ms...NOTES 14. ABSTRACT The purpose of this study was to inform CJ34 Civil Military Operations decisions on placement of internally displaced person (IDP

  14. Evaluation of Healthy Beginnings; Fort Carson’s Pregnancy Physical Training Program

    DTIC Science & Technology

    1999-04-20

    effects that medication may have on nursing infants, exercise as a non-pharmacological intervention for post-partum depression and anxiety may be...record. Verification of this information was made by cross-checking a community nursing form titled “Pregnancy Surveillance Record”, which is...Standard Form (SF) 539, “Abbreviated Medical Record”, which documents complications during pregnancy. Listed under the Diagnosis and Procedures

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    The U.S. Army’s Fort Bragg partnered with the Department of Energy (DOE) to develop and implement solutions to build new, low-energy buildings that are at least 50% below Standard 90.1-2007 of the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE), the American National Standards Institute (ANSI), and the Illuminating Engineering Society of North America (IESNA) as part of DOE’s Commercial Building Partnerships (CBP) Program.

  16. Helicopter Dynamic Performance Program. Volume 2. User’s Manual

    DTIC Science & Technology

    1980-07-01

    Technologies Corporation Stratford, Connecticut 06602 July 1980 Final Report / • ., . Approved for public release; I distribution unlimited. ; A - Prepared...for : APPLIED TECHNOLOGY LABORATORY U. S. ARMY RESEARCH AND TECHNOLOGY LABORATORIES (AVRADCOM) Fort Eustis, Va. 23604 80 8 27 D APPLIED TECHNOLOGY ... Technology Division. Technic31 review of this report was also pro- vided by Messrs. W_ A. Pleasants of Design Integration and Analysis Technical Area

  17. Center of Gravity within the Ill-Structured Problem

    DTIC Science & Technology

    2012-05-04

    NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER Chad Livingston...Simon, Decision Making and Problem Solving 28 Cardon and Leonard, Unleashing Design, Planning and the Art of Battle Command, 2 11 complex, ill...Command. "Commander’s Appreciation and Campaign Design." Fort Monroe, VA, January 2008. Edward Cardon and Steve Leonard. "Unleashing Design, Planning

  18. Between Heroes and Guardians: General Lyman L. Lemnitzer and General Charles H. Bonesteel III

    DTIC Science & Technology

    2015-05-21

    16 David S. Patterson , Paul Claussen, Evan M. Duncan, Jeffrey A. Soukup, eds., Foreign Relations...Korea, 1966-1969, Leavenworth Papers no 19 (Fort Leavenworth: Combat Studies Institute, 1991); Amos A. Jordan, Jr ., Issues of National Security in...Representative in Europe, Mutual Security Program, Paris, France, 1952-53. 20 Allan R. Millett, Peter Maslowski, and William B. Feis, For the Common

  19. Developing Memory Reconsolidation Blockers as Novel PTSD Treatments

    DTIC Science & Technology

    2011-06-01

    REPORT DATE: June 20 TYPE OF REPORT: Annual PREPARED FOR: U.S. Army Medical Research and Materiel...MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) U.S. Army Medical Research and Materiel Command Fort Detrick, Maryland...Diabetes Program.10 Given our duty as health care pro- viders to reduce the risk of our treat- ments (ie, psychiatric medications ) to our patients, we

  20. A Study to Determine Whether Nurse Practitioners are Appropriately Utilized at Moncrief Army Hospital, Fort Jackson, South Carolina

    DTIC Science & Technology

    1981-08-01

    cent are family practice, 17.6 per cent are adult medicine, 10.7 per cent are maternity, 8.4 per cent are midwifery , 13 and 3 per cent are psychiatric...authority to prescribe drugs listed in the algorithm. 15 The Physician Assistants (PA) are corpsmen who are given a two year 5 training program and

  1. Job Satisfaction of Dietitians in the Army Medical Specialists Corps

    DTIC Science & Technology

    1981-01-01

    in the clinical branches while only 3.&% were assigned as staff administrative dietitians in the production and service branches. Distribution of the...Leavenworth, Kansas and the U.S. Amy-Baylor University Program in Health Care Administration , Fort Sam Houston, Texas. Test of analysis of variance of mean...Chief, Food Service Division; Chief, Production and Service Branch; Chief, Clinical Dietetic Branch; Staff Administrative Dietitian; Staff Clinical

  2. 77 FR 3324 - Release of Airport Property: Fort Myers International Airport, Fort Myers, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-23

    ... north of Daniels Parkway and Chana Court, near the intersection of Chamberlin Parkway, in Fort Myers... appraised Fair Market Value of $41,622. The value of the parcel to be received is $5,000, and the value of...

  3. FAA Aviation Forecasts, Fiscal Years 1994-2005

    DTIC Science & Technology

    1994-03-01

    ID (BOI) Fort Lauderdale Executive, FL (FXE) Idaho Falls Fanning Field, ID (IDA) Fort Myers Page Field, FL (FMY) Lewiston , ID (LWS) Fort Myers...Pacoima/Whitman, California (WHP) 3. Lakeland, Florida (LAL) 4. Valdosta Municipal, Georgia (VLD) 5. Halley, Idaho (SUN) 6. Marion Williamson County

  4. NPDES Permit for Fort Carson Landfill No. 5 in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit CO-0034771, the United States Army, HQ, Fort Carson, is authorized to discharge groundwater seepage from the Landfill No. 5 facility at the Fort Carson Army Post in El Paso County, Colorado, to B Ditch, a tributary of Fountain Creek.

  5. 29. Photographic copy of historic drawing, "The Rebel Fort Near ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. Photographic copy of historic drawing, "The Rebel Fort Near Portsmouth," known as Fort Nelson, anonymous, ca. 1886. (Portsmouth Naval Shipyard Museum, Portsmouth, VA) - Portsmouth Naval Hospital, Bounded by Elizabeth River, Crawford Street, Portsmouth General Hospital, Parkview Avenue, & Scotts Creek, Portsmouth, Portsmouth, VA

  6. 76 FR 75917 - Post Office Closing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-05

    ... POSTAL REGULATORY COMMISSION [Docket No. A2012-63; Order No. 1004] Post Office Closing AGENCY... the closing of the Fort Meade, South Dakota post office has been filed. It identifies preliminary... Postal Service's determination to close the Fort Meade post office in Fort Meade, South Dakota. The...

  7. 7. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLANS, ELEVATIONS, PLAN NUMBER 800-222 - Fort McCoy, Building No. T-555, East Twelfth Avenue, Approximately 50' North of Intersection with East "M" Street, Sparta, Monroe County, WI

  8. 5. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLANS, ELEVATIONS & SECTIONS, PLAN NUMBER 800-1429 - Fort McCoy, Building No. T-351, 100' South of Intersection of East Twelfth Avenue & East "H" Street, Sparta, Monroe County, WI

  9. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FOUNDATION SETTING (PLAN, DETAILS),PLAN NUMBER 6150-20-B - Fort McCoy, Building No. T-10127, Northwest of Hospital Boiler House, Building T-10111, Block 10, Sparta, Monroe County, WI

  10. 8. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLANS & ELEVATIONS, PLAN NUMBER 800-480 - Fort McCoy, Building No. T-352, Approximately 200' South of Intersection of East Twelfth Street & East "H" Street, Sparta, Monroe County, WI

  11. 6. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLANS, ELEVATIONS & SECTION, PLAN NUMBER 800-849 - Fort McCoy, Building No. T-450, 50' South of Intersection of East Twelfth Avenue with East "J" Street, Sparta, Monroe County, WI

  12. 4. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FLOOR PLANS, PLAN NUMBER 800-1487 - Fort McCoy, Building No. T-1056, Southwest of intersection of South Tenth Avenue & South "X" Street, Block 10, Sparta, Monroe County, WI

  13. 5. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FRAMING ELEVATIONS & SECTIONS, PLAN NUMBER 800-1488 - Fort McCoy, Building No. T-1056, Southwest of intersection of South Tenth Avenue & South "X" Street, Block 10, Sparta, Monroe County, WI

  14. 3. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin) FLOOR PLAN, PLAN NUMBER 800-1424 - Fort McCoy, Building No. T-1065, Northeast of Intersection of South Ninth Avenue & South "Y" Street, Block 10, Sparta, Monroe County, WI

  15. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLANS & ELEVATIONS, PLAN NUMBER 800-210 - Fort McCoy, Building No. T-1099, South of South Ninth Avenue, in Southeast Quadrant of Hospital Area, Block 10, Sparta, Monroe County, WI

  16. 4. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin) ELEVATIONS & DETAILS, PLAN NUMBER 800-1425 - Fort McCoy, Building No. T-1065, Northeast of Intersection of South Ninth Avenue & South "Y" Street, Block 10, Sparta, Monroe County, WI

  17. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin), PLAN & SECTION, OBSTETRICAL WARD, PLAN 47-018-1088 (1 of 3) - Fort McCoy, Building No. T-1041, North side of Tenth Avenue, Block 10, Sparta, Monroe County, WI

  18. 7. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLANS & MISCELLANEOUS DETAILS, PLAN NUMBER 800-479 - Fort McCoy, Building No. T-352, Approximately 200' South of Intersection of East Twelfth Street & East "H" Street, Sparta, Monroe County, WI

  19. Fort Bliss Geothermal Area Data: Temperature profile, logs, schematic model and cross section

    DOE Data Explorer

    Adam Brandt

    2015-11-15

    This dataset contains a variety of data about the Fort Bliss geothermal area, part of the southern portion of the Tularosa Basin, New Mexico. The dataset contains schematic models for the McGregor Geothermal System, a shallow temperature survey of the Fort Bliss geothermal area. The dataset also contains Century OH logs, a full temperature profile, and complete logs from well RMI 56-5, including resistivity and porosity data, drill logs with drill rate, depth, lithology, mineralogy, fractures, temperature, pit total, gases, and descriptions among other measurements as well as CDL, CNL, DIL, GR Caliper and Temperature files. A shallow (2 meter depth) temperature survey of the Fort Bliss geothermal area with 63 data points is also included. Two cross sections through the Fort Bliss area, also included, show well position and depth. The surface map included shows faults and well spatial distribution. Inferred and observed fault distributions from gravity surveys around the Fort Bliss geothermal area.

  20. Salicylic acid plasma levels following multiple doses of Norgesic Forte and aspirin.

    PubMed

    Harrison, L I; Kehe, C R; Goldlust, M B; Kvam, D C; Bianchine, J R

    1983-01-01

    Plasma salicyclic acid levels from the recommended multiple dose regimen of Norgesic Forte (orphenadrine citrate, aspirin, and caffeine) were compared to those from an equivalent multiple dose regimen of aspirin alone in 24 volunteers. The drugs were administered double-blind so that side effects could also be compared. No statistically significant differences were found between Norgesic Forte and aspirin in peak or trough levels, time to peak level, area under the curve, or mean steady-state level of salicylic acid. Mean steady-state levels averaged 154 +/- 46 (+/- SD) and 152 +/- 49 micrograms/ml on days 5 and 10 following Norgesic Forte versus 161 +/- 49 and 154 +/- 47 micrograms/ml following aspirin. Thus, the aspirin in Norgesic Forte provides an anti-inflammatory amount of salicylic acid equivalent to that of plain aspirin. There was no evidence that the combination of orphenadrine citrate, caffeine, and aspirin in Norgesic Forte caused increased or unusual side effects compared with aspirin alone.

  1. Interaction Between Strategic and Local Traffic Flow Controls

    NASA Technical Reports Server (NTRS)

    Grabbe, Son; Sridhar, Banavar; Mukherjee, Avijit; Morando, Alexander

    2010-01-01

    The loosely coordinated sets of traffic flow management initiatives that are operationally implemented at the national- and local-levels have the potential to under, over, and inconsistently control flights. This study is designed to explore these interactions through fast-time simulations with an emphasis on identifying inequitable situations in which flights receive multiple uncoordinated delays. Two operationally derived scenarios were considered in which flights arriving into the Dallas/Fort Worth International Airport were first controlled at the national-level, either with a Ground Delay Program or a playbook reroute. These flights were subsequently controlled at the local level. The Traffic Management Advisor assigned them arrival scheduling delays. For the Ground Delay Program scenarios, between 51% and 53% of all arrivals experience both pre-departure delays from the Ground Delay Program and arrival scheduling delays from the Traffic Management Advisor. Of the subset of flights that received multiple delays, between 5.7% and 6.4% of the internal departures were first assigned a pre-departure delay by the Ground Delay Program, followed by a second pre-departure delay as a result of the arrival scheduling. For the playbook reroute scenario, Dallas/Fort Worth International Airport arrivals were first assigned pre-departure reroutes based on the MW_2_DALLAS playbook plan, and were subsequently assigned arrival scheduling delays by the Traffic Management Advisor. Since the airport was operating well below capacity when the playbook reroute was in effect, only 7% of the arrivals were observed to receive both rerouting and arrival scheduling delays. Findings from these initial experiments confirm field observations that Ground Delay Programs operated in conjunction with arrival scheduling can result in inequitable situations in which flights receive multiple uncoordinated delays.

  2. The current state of orthopaedic residency in 18 European countries.

    PubMed

    Madanat, Rami; Mäkinen, Tatu J; Ryan, Daniel; Huri, Gazi; Paschos, Nikolaos; Vide, Joao

    2017-04-01

    The aim of this study was to compare differences in current orthopaedic and trauma training programs across Europe. A questionnaire was sent to the FORTE (Federation of Orthopaedic Trainees in Europe) representatives of 25 different European countries, of which 18 responded. The questionnaire included demographic information and information concerning the structure of the training programs, including duration, selection, and mandatory training requirements. The number of trainees per specialist varied between countries from a ratio of 1:2 to 1:7. Residency was generally five to six years in all the countries. In more than half of the countries selection was interview-based. Nearly all countries utilized a logbook. About 80% of the participating countries had a final examination. When assessing the components of training it was found that only one country (the United Kingdom) had mandatory minimum requirements for (1) courses, (2) surgical procedures, (3) research and (4) leadership. Nearly 40% of the participating countries had only one or none of these four components as a mandatory training requirement. There are many similarities in training programs, but some important differences remain in overall requirements and final qualification. The main limitation of this study was that we were unable to get data from all the European countries. FORTE will continue to serve as a forum for sharing best practices with the ultimate goal of improving and harmonizing the level of orthopaedic training across Europe. Future studies should aim to include further details about training programs as well as to include data from more countries.

  3. 5. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin), GASOLINE STATION AND PUMP HOUSE, PLAN NUMBER 800-601 - Fort McCoy, Building No. T-1467, 1300' East of Intersection of South Ninth Avenue with South "J" Street, Sparta, Monroe County, WI

  4. 18. Historic American Buildings Survey. Portion of an anonymous watercolor ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Historic American Buildings Survey. Portion of an anonymous watercolor painting of Fort McHenry bombardment of 1814. Peale Museum, Baltimore. View of southeast bastion and sally port. - Fort McHenry National Monument & Historic Shrine, East Fort Avenue at Whetstone Point, Baltimore, Independent City, MD

  5. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin. SHELTER FOR VACUUM PUMPS, PLAN NUMBER 700-249 - Fort McCoy, Building No. 10128, Southwest Corner of Two Enclosed Walkways Connecting Buildings T-10113 & T-10111, Block 10, Sparta, Monroe County, WI

  6. 7. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). ARCHITECTURAL, STRUCTURAL, PLUMBING, HEATING, ELECTRICAL, PLAN NUMBER 800-308 - Fort McCoy, Building No. T-901, 125' South of Intersection of East "S" Street & East Twelfth Avenue, Sparta, Monroe County, WI

  7. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FOUNDATION SETTING (FRAMING ELEVATIONS, DETAILS, PLAN NUMBER 6150-21-B - Fort McCoy, Building No. T-10127, Northwest of Hospital Boiler House, Building T-10111, Block 10, Sparta, Monroe County, WI

  8. 9. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FLOOR PLAN, MODIFIED C1-C (sic), DRAWING NUMBER DE-7031-1078 - Fort McCoy, Building No. T-1033, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI

  9. 7. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLANS, ELEVATIONS, SECTIONS, DETAILS, PLAN NUMBER 800-1454 - Fort McCoy, Building No. T-10112, South of Intersection of South Eighth Avenue & South "X" Street, Block 10, Sparta, Monroe County, WI

  10. Photocopy of War Department drawing (original located at Fort McCoy, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin. CONDENSATION PUMP ROOM, PLAN NUMBER 6150-25-D - Fort McCoy, Building No. 10128, Southwest Corner of Two Enclosed Walkways Connecting Buildings T-10113 & T-10111, Block 10, Sparta, Monroe County, WI

  11. Geology and ground-water resources of the Fort Berthold Indian Reservation, North Dakota, with a section on the chemical quality of the ground water

    USGS Publications Warehouse

    Dingman, Robert James; Gordon, Ellis D.; Swenson, H.A.

    1954-01-01

    The Fort Berthold Indian Reservation occupies about 1,000 square miles in west- central North Dakota. The Missouri and Little Missouri Rivers flow through the area and form part of its boundaries. Garrison Dam, which is under construction on the Missouri River 30 miles downstream from the east boundary of the reservation, will impound water in Garrison Reservoir and flood the valleys of both rivers throughout the area. The reservoir will divide the reservation into five parts, herein referred to as the eastern, northeastern, northern, western, and southern segments. Rock formations ranging in age from Paleocene to Recent are exposed. The Fort Union formation of Paleocene age underlies the entire reservation, and it crops out along the Missouri and Little Missouri Rivers. Relatively thin glacial till and outwash deposits of late Pleistocene age mantle much of the upland in all of the segments. The glacial de. posits commonly are less than 10 feet thick; in many places they consist only of scattered boulders on the bedrock surface. The major valleys have terrace deposits of Pleistocene and Recent age and alluvium of Recent age. The principal mineral resources of the reservation are lignite, sand, and gravel. The lignite beds range in thickness from a few inches to about 30 feet. At least four separate beds, which range in thickness from 4 feet to more than 7 feet, are mined locally. Although many mines will be flooded after Garrison Dam is completed, many suitable mine sites will remain above the proposed reservoir level. Sand and gravel deposits are found in glacial outwash and in stream-terrace deposits. On upland areas of the reservation ground water is available principally from the lignite and the associated fine- to medium-grained sandstone beds of the Fort Union formation. Few wells on the reservation are known to produce water from glacial material, although the recessional moraines are possible sources of shallow-water supplies. Small quantities of ground water are available from thin alluvial deposits in some places on the upland. Most wells in the valleys produce water from the alluvium or the terrace deposits. However, several wells penetrate the underlying Fort Union formation. A few flowing wells in the Missouri River valley near Elbowoods produce water from either the lower part of the Fort Union formation or from the Cannonball formation, also of Paleocene age. The chemical character of water from the Fort Union formation and the outwash and river gravels was determined from analyses of 39 samples from wells and springs. Water from bedrock may be either hard or soft, and it is moderately to highly mineralized. Water from the surficial deposits is uniformly hard, but it is less mineralized. Shallow wells in the eastern and northeastern segments produce water of good quality. Wells in these segments, and several springs in the western segment, could be used satisfactorily as domestic supplies. Spring water from lignite deposits on the reservation generally is colored and contains objectionable amounts of iron. Treatment of the water would improve its quality for domestic use. The filling of Garrison Reservoir will cause a rise of the water levels in wells that tap aquifers now discharging below the operating level of the reservoir. All the permeable strata below this level will become saturated, and ground-water bodies that are now separated will become hydraulically united. In addition to providing subsurface information, the drilling program of the U. S. Bureau of Indian Affairs provided wells for domestic and stock-water supplies. All test holes that tapped an adequate supply of potable water were reamed to a larger diameter, equipped with casing and well screen, and gravel-packed. The test-drilling program was completed in 1951; however, the drilling of domestic wells was continued under the supervision of the U. S. Geological Survey.

  12. 75 FR 17691 - Foreign-Trade Zone 196 - Fort Worth, Texas, Application for Manufacturing Authority, ATC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [Docket 19-2010] Foreign-Trade Zone 196 - Fort Worth, Texas, Application for Manufacturing Authority, ATC Logistics & Electronics (Cell Phone Kitting... Board (the Board) by ATC Logistics & Electronics (ATCLE), operator of Site 2, FTZ 196, Fort Worth, Texas...

  13. 24. Historic American Buildings Survey. Plan of the Parapet of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. Historic American Buildings Survey. Plan of the Parapet of Fort Hamilton, 1814, designed by John Foncin. Drawing in the William Strickland account book, State Records Office, Harrisburg, Pa. - Fort McHenry National Monument & Historic Shrine, East Fort Avenue at Whetstone Point, Baltimore, Independent City, MD

  14. Hazardous Waste Cleanup: General Electric - Fort Edward in Fort Edward, New York

    EPA Pesticide Factsheets

    This 32-acre General Electric (GE) facility is located approximately 800 feet east of the Hudson River between the Villages of Fort Edward to the south and Hudson Falls to the north. A 200-foot-wide parcel west of the main portion of the site, between Alle

  15. 78 FR 66330 - Foreign-Trade Zone 196-Fort Worth, Texas, Authorization of Production Activity, Flextronics...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-05

    ... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [B-62-2013] Foreign-Trade Zone 196--Fort Worth, Texas, Authorization of Production Activity, Flextronics International USA, Inc. (Mobile Phone Assembly and Kitting), Fort Worth, Texas On June 14, 2013, Flextronics International USA, Inc. submitted a...

  16. 4. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLANS FOR LAVATORIES, TYPES: L-7 (400 MEN), L-9 (500 MEN), PLAN NUMBER 700-287 - Fort McCoy, Building No. T-2310, 250' West of Building No. L-7, Sparta, Monroe County, WI

  17. National Waterways Study. Review of National Defense Emergency and Safety Issues Affecting the Waterways.

    DTIC Science & Technology

    1981-07-01

    Sheffield, AL Arkansas River Fort Chaffee Fort Smith , AR Pine Bluff Arsenal Pine Bluff, AR Gulf Coast East Fort Benning Columbus, GA Middle Atlantic...Pittsburgh District, United States Army Corps of Engineers. Pittsburgh, Pennsylvania: United States Army Corps of Engineers [no date]. MacLeay, Lachlan

  18. 10. PERSPECTIVE VIEW OF NORTH (REAR) AND WEST SIDE OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. PERSPECTIVE VIEW OF NORTH (REAR) AND WEST SIDE OF SECOND FLOOR, WEST ROOM SHOWING RELATIONSHIP TO NORTH TERREPLEIN OF NORTHWEST DEMI-BASTION AND STAIRS LEADING TO GUN MOUNT ABOVE MAIN GATE - Fort Washington, Main Gate, Fort Washington Road, Fort Washington Forest, Prince George's County, MD

  19. Photographic copy of photograph, date unknown (original print located at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of photograph, date unknown (original print located at the History Office, U.S. Army South, Fort Clayton, Republic of Panama). Early view of Fort Sherman from boat dock with theater in background, facing southwest. - Fort Sherman, Toro Point on Limon Bay, Colon, Former Panama Canal Zone, CZ

  20. 78 FR 59966 - Notice of Inventory Completion: Fort Lewis College, Durango, CO; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-WASO-NAGPRA-13941; PPWOCRADN0-PCU00RP14.R50000] Notice of Inventory Completion: Fort Lewis College, Durango, CO; Correction AGENCY: National Park... objects. ADDRESSES: Dawn Mulhern, Department of Anthropology, Fort Lewis College, 1000 Rim Dr., Durango...

  1. 76 FR 73683 - Whirlpool Corporation, Including On-Site Leased Workers From Career Solutions TEC Staffing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ..., Inc., Fort Smith, AR; Amended Certification Regarding Eligibility To Apply for Worker Adjustment... Career Solutions TEC Staffing, Fort Smith, Arkansas. The workers are engaged in the production of...., Prodriver, and Arkansas Warehouse, Inc. were employed on-site at the Fort Smith, Arkansas location of...

  2. 27 CFR 9.112 - Arkansas Mountain.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    .... (2) Fort Smith, Arkansas-Oklahoma, 1:250,000 series, 1978. (c) Boundary—(1) General. The Arkansas... converges with the Arkansas River, near Yoestown, Arkansas (or the Fort Smith map), the boundary proceeds... county line to Jones Fork (on the Fort Smith map). (xvi) Then southward along Jones Fork until it joins...

  3. 76 FR 72978 - Whirlpool Corporation Including On-Site Leased Workers From Career Solutions TEC Staffing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-28

    ..., TEK Systems, Penske Logistics, Eurest, and Canteen, Fort Smith, AR; Amended Certification Regarding... Corporation, including on-site leased workers from Career Solutions TEC Staffing, Fort Smith, Arkansas. The... Corporation, TEK Systems, Penske Logistics, Eurest, and Canteen were employed on-site at the Fort Smith...

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meyers, Tilden

    This is the AmeriFlux version of the carbon flux data for the site US-FPe Fort Peck. Site Description - The Fort Peck, Montana station is located on the Fort Peck Tribes Reservation, approximately fifteen miles north of Poplar, Montana. The tower is located to the west of the SURFRAD instrumentation and was installed in November of 1999.

  5. 7. Photocopy of War Department drawing (original located at Fort ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). PLANS & ELEVATIONS, PLAN NUMBER 800-1007 - Fort McCoy, Building No. T-449, West Side of East Twelfth Avenue, Approximately 300' South of East Twelfth Street & East "I" Street, Sparta, Monroe County, WI

  6. 28. Site Plan: AF Station P67, Fort Custer, Michigan, Plot ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Site Plan: AF Station P-67, Fort Custer, Michigan, Plot Plan (to accompany FY 1956 project planning report), USACOE, 22 July 1954. - Fort Custer Military Reservation, P-67 Radar Station, .25 mile north of Dickman Road, east of Clark Road, Battle Creek, Calhoun County, MI

  7. Cost Benefit Analysis of a Utility Scale Waste-to-Energy/Concentrating Solar Power Hybrid Facility at Fort Bliss

    DTIC Science & Technology

    2012-06-01

    installations for Energy, Waste, and Water. This means Fort Bliss will strive to become Net Zero Energy, Net Zero Waste , and Net Zero Water in the coming...years. Net Zero Energy requires Fort Bliss to produce as much energy on-installation as it consumes annually. Net Zero Waste aims to reduce, reuse...become Net Zero Energy and Net Zero Waste by 2020. A WtE facility actually goes well beyond Fort Bliss’ Net Zero Energy mission. That mission

  8. Logistics Handbook for Strategic Mobility Planning

    DTIC Science & Technology

    1992-09-01

    242 181 79 184 MASSACHUSETTS Fort Devens 69 88 204 212 213 261 297 389 549 Hanscom AFB 55 66 214 222 223 271 304 399 556 S Weymouth NAS 43 63 219 227...1015 962 Pax River NAS 366 389 516 701 590 724 1054 11009 964 MASSACHUSETTS Fort Devens 786 809 938 1123 1012 1158 1476 1432 1379 HanscomAFB 796 819 948...1715 Castle AFB 2212 2213 2180 2130 1901 1880 1843 1793 1751 Fort Baker 2329 2330 2297 2258 2004 1983 1946 1896 1854 Fort H. Liggett 2265 2266 2219

  9. No Further Action Decision Under CERCLA Study Area 43E Historic Gas Station Sites Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-01-01

    AREA 43E * HISTORIC GAS STATION SITES g FORT DEVENS , MASSACHUSETTS £ I CONTRACT DAAA15-91-D-0008I U.S. ARMY ENVIRONMENTAL CENTER3 ABERDEEN PROVING...FURTHER ACTION DECISION UNDER CERCLA STUDY AREA 43E HISTORIC GAS STATION SITES I FORT DEVENS , MASSACHUSETTS i I 1 Prepared for: U.S. Army...7053-12 JANUARY 1995 I I. NO FURTHER ACTION DECISION UNDER CERCLA STUDY AREA 43E HISTORIC GAS STATION SITES FORT DEVENS , MASSACHUSETTS TABLE OF CONTENTS

  10. Excavated Soils Management Plan for AOCs 44 and 52, Fort Devens

    DTIC Science & Technology

    1994-05-01

    I FORT DEVENS AOCs 44 AND 52 I I I FINAL EXCAVATED SOILS MANAGEMENT PLAN DATA ITEM A009I I U 20070424310 I CONTRACT DAAA15-91-D-0008 I U.S. ARMY...obselete FINAL EXCAVATED SOILS MANAGEMENT PLAN FOR AOCs 44 AND 52 FORT DEVENS Prepared for. U.S. Army Enviromnental Center Aberdeen Proving Ground, Maryland...BLANK 3 I I I I I I I I I I FINAL EXCAVATED SOILS MANAGEMENT PLAN FOR AOCs 44 AND 52 FORT DEVENS TABLE OF CONTENTS 1 Section Title Page No. 1.0

  11. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY83, Part 2 (Flint, Michigan - Wheatland, Wyoming).

    DTIC Science & Technology

    1983-01-01

    MARK AERIAL SURVEYS INC MINNEAPOLIS MINNESOTA 538 538 HYDRAULIC SPECIALTY CO MINNEAPOLIS MINNESOTA 36 3r INTRAN CORP MINNEAPOLIS MINNESOTA 171 171 J C...OITEv sOWES INC VICKSBURG mISS 25 25 PONTCHARTRAIN MATERIALS CORP VICKSURG mISS 543 543 OUCKETT MAH4INERY C VICKSBURG MISS 217 217 IACAL DECCA SURVEY ...ASSOCIATES FORT DIX NEW JERSEY 42 42 EC INC FORT DIX NEW JERSEY 28 28 EY SHAMPOOING CO FORT DIX NEW JERSEY 475 475 JERSEY BELL TELEPHONE CO FORT DIX

  12. Anatomy of the Le Fort I segment: Are arterial variations a potential risk factor for avascular bone necrosis in Le Fort I osteotomies?

    PubMed

    Bruneder, Simon; Wallner, Jürgen; Weiglein, Andreas; Kmečová, Ĺudmila; Egger, Jan; Pilsl, Ulrike; Zemann, Wolfgang

    2018-05-02

    Osteotomies of the Le Fort I segment are routine operations with low complication rates. Ischemic complications are rare, but can have severe consequences that may lead to avascular bone necrosis of the Le Fort I segment. Therefore the aim of this study was to investigate the blood supply and special arterial variants of the Le Fort I segment responsible for arterial hypoperfusion or ischemic avascular necrosis after surgery. The arterial anatomy of the Le Fort I segment's blood supply using 30 halved human cadaver head specimens was analyzed after complete dissection until the submicroscopic level. In all specimens the arterial variants of the Le Fort I segment and also the arterial diameters measured at two points were evaluated. The typical known vascularization pattern was apparent in 90% of all specimens, in which the ascending palatine (D1: 1,2 mm ± 0,34 mm; D2: 0,8 mm ± 0,34 mm) and ascending pharyngeal artery (D1: 1,3 mm ± 0,58 mm; D2: <0,4 mm) were both supplying the Le Fort I segment. However in 10% of all specimens, the Le Fort I segment was dependent on the ascending pharyngeal artery alone and the missing ascending palatine artery was replaced with the anterior branch of the ascending pharyngeal artery (D1: 1,9 mm ± 0,32; D2: 1,0 mm ± 0,3 mm). This study is the first description of a special type of arterial variation of the Le Fort I segment. The type of this arterial variation, its clinical relevance and potential consequences are explained. Individuals with this special arterial anatomy may clinically be at a high risk for hypoperfusion and avascular segment necrosis after surgery. An individualized operation plan may prevent ischemic complications in at-risk patients. Copyright © 2018 European Association for Cranio-Maxillo-Facial Surgery. Published by Elsevier Ltd. All rights reserved.

  13. Surgical management of patients with a history of early Le Fort III advancement after they have attained skeletal maturity.

    PubMed

    Caterson, E J; Shetye, Pradip R; Grayson, Barry H; McCarthy, Joseph G

    2013-10-01

    The classic Le Fort III procedure was recommended in syndromic craniosynostotic children to reduce exorbitism, improve airway function, and decrease dysmorphism. This study reports on a cohort of syndromic craniosynostosis patients who have undergone early primary subcranial (classic Tessier) Le Fort III advancement and who have been followed longitudinally through skeletal maturity and beyond. In this study, the Le Fort III advancements all occurred between the ages of 3 to 5 years, with a mean age of 4.6 years. Subsequently, these early Le Fort III patients were followed throughout development with longitudinal dental, medical, radiographic, and photographic evaluations conducted through skeletal maturity and beyond. For study inclusion, the patients had to have preoperative medical photographs and cephalometric studies at 6 months and 1, 5, and 10 years postoperatively after the primary Le Fort III advancement as well as cephalometric documentation 6 months and 1 year after the secondary midface advancement after skeletal maturity. After early or primary Le Fort III advancement, there was no evidence of relapse and only minimal anterior or horizontal postoperative growth of the midface. However, there was also a return of occlusal disharmony from "anticipated" mandibular growth, approaching a maximum at skeletal maturity. The dysmorphic concave facial profile and malocclusion, and airway and ocular considerations, provided the impetus for secondary midface surgery after skeletal maturity was attained. The data demonstrate that early Le Fort III advancement performed before the age of mixed dentition does not obviate the need for a secondary advancement after skeletal maturity is reached. Therapeutic, IV.

  14. Theater Sustainment Reserve for the Rwanda Defence Forces

    DTIC Science & Technology

    2016-06-10

    ORGANIZATION NAME( S ) AND ADDRESS(ES) U.S. Army Command and General Staff College ATTN: ATZL-SWD-GD Fort Leavenworth, KS 66027-2301 8. PERFORMING ORG...Staff College in partial fulfillment of the requirements for the degree MASTER OF MILITARY ART AND SCIENCE General Studies by RUKI...PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) Ruki Karusisi, Major 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING

  15. Mission Command During The Falklands War: Opportunities And Limitations

    DTIC Science & Technology

    2016-05-26

    Monograph by MAJ Brice Roberts United States Army School of Advanced Military Studies United States Army Command and General Staff College Fort...SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) Advanced Military Studies Program CGSC 11. SPONSOR...This study examines the six principles of mission command, as defined by ADP 6-0, as a lens to evaluate operations conducted by the Landing Force

  16. Rapid Extremity Pain Relief by Battlefield Acupuncture after Orthopedic Surgery: A Randomized Clinical Trial

    DTIC Science & Technology

    2017-03-21

    FINAL REPORT Project Title: Rapid Extremity Pain Relief by Battlefield Acupuncture after Orthopedic Surgery: A Randomized Clinical Trial...Center ATTN: DTIC-OA 8725 John J. Kingman Rd Fort Belvoir, VA 22060-6218 Submitted by: Jill M. Clark, MBA/HCM, CCRP, CCRC Senior Research ...Associate/ Research Manager Clinical Investigation Program Mike O’Callaghan Federal Medical Center (MOFMC) 4700 Las Vegas Blvd North, Bldg 1300, Room

  17. Enhanced Preliminary Assessment. Fort Des Moines. Des Moines, Iowa

    DTIC Science & Technology

    1989-12-01

    U.S. Army Toxic and Hazardous Materials Agency 0 Aberden Proving Ground , Maryland 21010-5401 Prepared by Roy F. Weston, Inc. West Chester...Aberdeen Proving Ground (Edgewood Maryland 21010-5401 areE &a. NAME OF FUNDING/SPONSORING r8b. OFFICE SYMBOL 9. PROCUREMENT INSTRUMENT IDENTIFICATION...ATTN: CETHA-BC-B PROGRAM PROJECT ITASK IWORK UNIT Aberdeen Proving Ground (Edgewood Area) ELEMENT NO. NO. NO. ACCESSION NO Maryland 21010-5401 11

  18. Impact of Critical Care Trained Flight Paramedics on Casualty Survival During Helicopter Evacuation in the Current War in Afghanistan

    DTIC Science & Technology

    2012-01-01

    survival during helicopter evacuation in the current war in Afghanistan Robert L . Mabry ...MD, MC, Amy Apodaca , MS, Jason Penrod , PharmD, Jean A . Orman , ScD, MPH, Robert T. Gerhardt , MD, MPH, and Warren C. Dorlac, MD, Fort Sam Houston...GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Mabry R. L ., Apodaca A ., Penrod J.,

  19. Dental Considerations in a Unified Medical Command

    DTIC Science & Technology

    2007-03-23

    control, taking the Navy Dental Corps back to its pre -1946 5 status. The ADA, through major policies adopted to date, opposes such relationships...future Institute of Surgical Research at Fort Sam Houston with the Army as the executive agent. Dental research is extremely important to support...educations, while contributing to the dental readiness of their respective populations. The Orthodontic program at Wilford Hall is an example of a joint

  20. Synthetic Fuel Blend Demonstration Program at Fort Bliss, Texas

    DTIC Science & Technology

    2010-05-01

    A. Muzzell National Automotive Center U.S. Army RDECOM Warren, MI for U.S. Army TARDEC Force Projection Technologies Warren, Michigan...Projection Technologies Warren, Michigan Contract No. DAAE-07-99-C-L053 (WD23 – Task XII) SwRI® Project No. 08.03227.23.250 Approved for public...information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and

Top