Sample records for program execution plan

  1. Monitored execution of robot plans produced by STRIPS.

    NASA Technical Reports Server (NTRS)

    Fikes, R. E.

    1972-01-01

    We describe PLANEX1, a plan executor for the Stanford Research Institute robot system. The problem-solving program STRIPS creates a plan consisting of a sequence of actions, and PLANEX1 program carries out the plan by executing the actions. PLANEX1 is designed so that it executes only that portion of the plan necessary for completing the task, reexecutes any portion of the plan that has failed to achieve the desired results, and initiates replanning in situations where the plan can no longer be effective in completing the task. The scenario for an example plan execution is given.

  2. A Generalized-Compliant-Motion Primitive

    NASA Technical Reports Server (NTRS)

    Backes, Paul G.

    1993-01-01

    Computer program bridges gap between planning and execution of compliant robotic motions developed and installed in control system of telerobot. Called "generalized-compliant-motion primitive," one of several task-execution-primitive computer programs, which receives commands from higher-level task-planning programs and executes commands by generating required trajectories and applying appropriate control laws. Program comprises four parts corresponding to nominal motion, compliant motion, ending motion, and monitoring. Written in C language.

  3. Operate A Chemical Surety Program And Studies Supporting The Medical Chemical Defense Research Program

    DTIC Science & Technology

    2010-05-01

    23 Task Execution Plan 34 – Temperature Testing of Pyridostigmine Bromide (PB) .......... 23 KEY RESEARCH ACCOMPLISHMENTS...29, 2010. Staff was assembled and materials have been ordered. Task Execution Plan (TEP) 0034 – Temperature Testing of Pyridostigmine Bromide

  4. Effectiveness of Therapeutic Programs for Students with ADHD with Executive Function Deficits

    ERIC Educational Resources Information Center

    Chaimaha, Napalai; Sriphetcharawut, Sarinya; Lersilp, Suchitporn; Chinchai, Supaporn

    2017-01-01

    The purpose of this study was to investigate the effectiveness of therapeutic programs, an executive function training program and a collaborative program, for students with attention-deficit/hyperactivity disorder (ADHD) with executive function deficits (EFDs), especially regarding working memory, planning, and monitoring. The participants were…

  5. Joint Exercise Program: DOD Needs to Take Steps to Improve the Quality of Funding Data

    DTIC Science & Technology

    2017-02-01

    technology systems—the Joint Training Information Management System (JTIMS) and the Execution Management System—to manage the execution of the Joint...Exercise Program, but does not have assurance that funding execution data in the Execution Management System are reliable. JTIMS is the system of record...for the Joint Exercise Program that combatant commanders use to plan and manage their joint training exercises. GAO observed significant variation

  6. Texas hospital chief executive officers evaluate content areas in health administration education.

    PubMed

    Harkins, L T; Herkimer, A G

    1995-01-01

    Health care executives are confronted by a working environment that is increasingly difficult to manage. Skyrocketing health care costs, with shrinking reimbursement, threaten the existence of hospitals. A successful hospital chief executive officer (CEO) is one who can effectively manage his/her hospital in spite of industry challenges and problems. Graduate programs in health services administration must be designed to meet the needs of future health care executives. Many times, educators are criticized for not addressing "real world" issues within the curricular structure. The present study was conducted to gather information from executives who are the experts on what to expect in the health care industry regarding the appropriateness of curricular topics. Results indicate that practicing CEOs believe those curricular areas which focus on financial planning, budgeting, medical-legal issues, and strategic planning are more important than those that deal with international health care, epidemiology, or research methods. The information gathered in this study may be useful as a guide for educators, to evaluate and revise existing graduate programs in health care administration. Data presented here may also be used to assist in long-range planning for new health administration programs.

  7. National ITS Program Plan Executive Summary

    DOT National Transportation Integrated Search

    1995-03-01

    THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS FIRST EDITION OF THE PLAN WAS A JOINT EFFORT OF ITS AMERICA AND THE UNITED STATES DEPARTMEN...

  8. Creating a Marketing Plan.

    ERIC Educational Resources Information Center

    Sevier, Robert A.

    1989-01-01

    A guide to developing a college marketing plan defines key marketing terms, outlines the development of a plan (including institutional analysis, market research, strategy formation and execution, and program evaluation), and provides a list of important principles with which to operate a program. (MSE)

  9. Amy Schwab | NREL

    Science.gov Websites

    strategic scenario planning and analysis Program portfolio analysis Program management, planning and strategic execution Change management and operational improvement Research Interests Bioenergy supply chains management, organizational improvement, and program and project management. Prior Work Experience Consultant

  10. 5 CFR 2638.706 - Agency's written plan for annual ethics training.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 3 2011-01-01 2011-01-01 false Agency's written plan for annual ethics training. 2638.706 Section 2638.706 Administrative Personnel OFFICE OF GOVERNMENT ETHICS GOVERNMENT ETHICS OFFICE OF GOVERNMENT ETHICS AND EXECUTIVE AGENCY ETHICS PROGRAM RESPONSIBILITIES Executive Agency Ethics...

  11. 5 CFR 2638.706 - Agency's written plan for annual ethics training.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Agency's written plan for annual ethics training. 2638.706 Section 2638.706 Administrative Personnel OFFICE OF GOVERNMENT ETHICS GOVERNMENT ETHICS OFFICE OF GOVERNMENT ETHICS AND EXECUTIVE AGENCY ETHICS PROGRAM RESPONSIBILITIES Executive Agency Ethics...

  12. 5 CFR 2638.706 - Agency's written plan for annual ethics training.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 3 2014-01-01 2014-01-01 false Agency's written plan for annual ethics training. 2638.706 Section 2638.706 Administrative Personnel OFFICE OF GOVERNMENT ETHICS GOVERNMENT ETHICS OFFICE OF GOVERNMENT ETHICS AND EXECUTIVE AGENCY ETHICS PROGRAM RESPONSIBILITIES Executive Agency Ethics...

  13. 5 CFR 2638.706 - Agency's written plan for annual ethics training.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 3 2012-01-01 2012-01-01 false Agency's written plan for annual ethics training. 2638.706 Section 2638.706 Administrative Personnel OFFICE OF GOVERNMENT ETHICS GOVERNMENT ETHICS OFFICE OF GOVERNMENT ETHICS AND EXECUTIVE AGENCY ETHICS PROGRAM RESPONSIBILITIES Executive Agency Ethics...

  14. 5 CFR 2638.706 - Agency's written plan for annual ethics training.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 3 2013-01-01 2013-01-01 false Agency's written plan for annual ethics training. 2638.706 Section 2638.706 Administrative Personnel OFFICE OF GOVERNMENT ETHICS GOVERNMENT ETHICS OFFICE OF GOVERNMENT ETHICS AND EXECUTIVE AGENCY ETHICS PROGRAM RESPONSIBILITIES Executive Agency Ethics...

  15. 24 CFR 1003.206 - Program administration costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... reasonable administrative costs and carrying charges related to the planning and execution of community... this section and in § 1003.205—Eligible planning, urban environmental design and policy-planning... documents related to the program for submission to HUD; (vii) Coordinating the resolution of audit and...

  16. 40 CFR 68.155 - Executive summary.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Executive summary. 68.155 Section 68.155 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.155 Executive summary. The owner or...

  17. 40 CFR 68.155 - Executive summary.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Executive summary. 68.155 Section 68.155 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.155 Executive summary. The owner or...

  18. Multiscale Issues and Simulation-Based Science and Engineering for Materials-by-Design

    DTIC Science & Technology

    2010-05-15

    planning and execution of programs to achieve the vision of ? material -by-design?. A key part of this effort has been to examine modeling at the mesoscale...15. SUBJECT TERMS Modelling & Simulation, Materials Design 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT Same as Report (SAR) 18...planning and execution of programs to achieve the vision of “ material -by-design”. A key part of this effort has been to examine modeling at the mesoscale. A

  19. Business process modeling for the Virginia Department of Transportation : a demonstration with the integrated six-year improvement program and the statewide transportation improvement program : executive summary.

    DOT National Transportation Integrated Search

    2005-01-01

    This effort demonstrates business process modeling to describe the integration of particular planning and programming activities of a state highway agency. The motivations to document planning and programming activities are that: (i) resources for co...

  20. Implementing corporate wellness programs: a business approach to program planning.

    PubMed

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  1. SCORE/ACE Counselor Handbook. Service Corps of Retired Executives. Active Corps of Executives.

    ERIC Educational Resources Information Center

    Landsverk, Arvel; And Others

    This counselor handbook is intended to help Service Corps of Retired Executives/Active Corps of Executives (SCORE/ACE) counselors to plan and conduct counseling services more effectively. Included in the introductory section are an overview of the SCORE/ACE counseling program, a discussion of what the counselor does, directions for completing…

  2. Successful healthcare programs and projects: organization portfolio management essentials.

    PubMed

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  3. Developing an interdisciplinary certificate program in transportation planning, phase 2 : the eCertificate.

    DOT National Transportation Integrated Search

    2011-11-01

    This proposal extends the delivery of the recently developed graduate Certificate in Transportation : Planning to a wider audience through the establishment of an Executive Certificate Program by distance : (eCertificate). While the need for an inter...

  4. Rhode Island congestion management plan : executive summary

    DOT National Transportation Integrated Search

    1997-09-01

    This document provides an overview of the Rhode Island Congestion Management System (CMS) program consisting of the following: Congestion Management System Plan; Incident Management Plan; and Intelligent Transportation System (ITS) Early Deployment P...

  5. Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan

    NASA Technical Reports Server (NTRS)

    Smith, Janice F. (Compiler); Forrest, Larry

    1993-01-01

    A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.

  6. Laredo District Coahuila/Nuevo Leon/Tamaulipas border master plan : executive summary.

    DOT National Transportation Integrated Search

    2012-06-01

    Border Master Plans, as defined and supported by the U.S./Mexico Joint Working : Committee on Transportation Planning and Programming, the Federal Highway Administration, : and the U.S. Department of State, are comprehensive long range plans to inven...

  7. Manufacturing Methods and Technology Program Plan. Update.

    DTIC Science & Technology

    1981-11-01

    INDUSTRIAL BASE ENGINEERING ACTIVITY ROCK ISLAND. ILLINOIS 61299 82 INDEX PAGE I. INTRODUCTION The MMT Program Plan Update ........... 1 Industry Guide...obtained from that Plan, extra copies of which are available upon request from the Industrial Base Engineering Activity. Other sources for this data are...Major Subcommands (SUBMACOM’S). The SUBMACOM’S plan, formulate, budget, and execute individual projects. The Industrial Base Engineering Activity

  8. Volunteer water monitoring: A guide for state managers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-08-01

    Contents: executive summary; volunteers in water monitoring; planning a volunteer monitoring program; implementing a volunteer monitoring program; providing credible information; costs and funding; and descriptions of five successful programs.

  9. Flight Design System-1 System Design Document. Volume 9: Executive logic flow, program design language

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The detailed logic flow for the Flight Design System Executive is presented. The system is designed to provide the hardware/software capability required for operational support of shuttle flight planning.

  10. Artemis: Integrating Scientific Data on the Grid (Preprint)

    DTIC Science & Technology

    2004-07-01

    Theseus execution engine [Barish and Knoblock 03] to efficiently execute the generated datalog program. The Theseus execution engine has a wide...variety of operations to query databases, web sources, and web services. Theseus also contains a wide variety of relational operations, such as...selection, union, or projection. Furthermore, Theseus optimizes the execution of an integration plan by querying several data sources in parallel and

  11. 78 FR 16514 - Statement of Organization, Functions and Delegations of Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... 78 FR 14311-14312, dated March 5, 2013). This notice reflects organizational changes to the Health..., coordination, and planning in support of BPHC programs. Specifically: (1) Establishes program goals, objectives, and priorities, and provides oversight to their execution; (2) plans, directs, coordinates, supports...

  12. The RWJ Executive Nurse Fellows Program, Part 2: Mentoring for leadership success.

    PubMed

    Bellack, Janis P; Morjikian, Robin L

    2005-12-01

    This article is the second in a 3-part series describing the RWJ Executive Nurse Fellows Program, an advanced leadership program for nurses in senior executive roles who aspire to help lead and shape the US healthcare system of the future. Part 1 (October 2005) described the program, its core leadership competencies, and the primary components. This article discusses the mentor experience that is a cornerstone of the 3-year fellowship program. Fellows are encouraged to have this experience with senior-level executives outside of healthcare in order to broaden their leadership perspectives. Examples of these mentor experiences are described from the viewpoints of both fellows and mentors, including successes, challenges, and lessons learned. Part 3 (February 2006) will explain how fellows are required to create a business plan for their leadership project because it is so important for nurse leaders to offer a strong business case for proceeding with anew initiative, service, or program.

  13. A new DoD initiative: the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program

    NASA Astrophysics Data System (ADS)

    Arevalo, S.; Atwood, C.; Bell, P.; Blacker, T. D.; Dey, S.; Fisher, D.; Fisher, D. A.; Genalis, P.; Gorski, J.; Harris, A.; Hill, K.; Hurwitz, M.; Kendall, R. P.; Meakin, R. L.; Morton, S.; Moyer, E. T.; Post, D. E.; Strawn, R.; Veldhuizen, D. v.; Votta, L. G.; Wynn, S.; Zelinski, G.

    2008-07-01

    In FY2008, the U.S. Department of Defense (DoD) initiated the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program, a 360M program with a two-year planning phase and a ten-year execution phase. CREATE will develop and deploy three computational engineering tool sets for DoD acquisition programs to use to design aircraft, ships and radio-frequency antennas. The planning and execution of CREATE are based on the 'lessons learned' from case studies of large-scale computational science and engineering projects. The case studies stress the importance of a stable, close-knit development team; a focus on customer needs and requirements; verification and validation; flexible and agile planning, management, and development processes; risk management; realistic schedules and resource levels; balanced short- and long-term goals and deliverables; and stable, long-term support by the program sponsor. Since it began in FY2008, the CREATE program has built a team and project structure, developed requirements and begun validating them, identified candidate products, established initial connections with the acquisition programs, begun detailed project planning and development, and generated the initial collaboration infrastructure necessary for success by its multi-institutional, multidisciplinary teams.

  14. Fermilab | OCSR | Home

    Science.gov Websites

    Upgrade Project Fermilab Campus Master Plan Fermilab Campus & Facilities Planning Board Fermilab Chief Operations Officer, leads development of campus master planning and the associated execution of a program. The Campus Strategy identifies projects over a ten-year planning horizon to meet the projected

  15. Development of an instrumentation plan for the Ohio SPS test pavement (DEL-23-17.48) : executive summary, July 1994.

    DOT National Transportation Integrated Search

    1994-07-01

    A Specific Pavement Studies (SPS) program, formulated under the Strategic Highway Research Program (SHRP), consists of nine experiments, four of which will be included in this DEL-23 project. Since the basic instrumentation plan proposed by SHRP was ...

  16. The CCC Institutional Development Program: Organizational Change from the Chief Executive's Perspective.

    ERIC Educational Resources Information Center

    Ellison, Nolen M.; Eadie, Douglas C.

    Cuyahoga Community College's three-phase Institutional Development Program (IDP) was established in January, 1975, to provide systematic and uniform college-wide planning and management procedures. This report first discusses the social forces which led the college to undertake the IDP; identifies the long-range planning, governance, and…

  17. NASA Year 2000 (Y2K) Program Plan

    NASA Technical Reports Server (NTRS)

    1998-01-01

    NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.

  18. Automated synthesis of image processing procedures using AI planning techniques

    NASA Technical Reports Server (NTRS)

    Chien, Steve; Mortensen, Helen

    1994-01-01

    This paper describes the Multimission VICAR (Video Image Communication and Retrieval) Planner (MVP) (Chien 1994) system, which uses artificial intelligence planning techniques (Iwasaki & Friedland, 1985, Pemberthy & Weld, 1992, Stefik, 1981) to automatically construct executable complex image processing procedures (using models of the smaller constituent image processing subprograms) in response to image processing requests made to the JPL Multimission Image Processing Laboratory (MIPL). The MVP system allows the user to specify the image processing requirements in terms of the various types of correction required. Given this information, MVP derives unspecified required processing steps and determines appropriate image processing programs and parameters to achieve the specified image processing goals. This information is output as an executable image processing program which can then be executed to fill the processing request.

  19. How to Get a Maintenance Program Underway

    ERIC Educational Resources Information Center

    Lundy, Lyndall L.

    1975-01-01

    The article describes the development of a comprehensive maintenance program for the school shop. A general maintenance management outline provides direction for planning, execution, and evaluation. (MW)

  20. 41 CFR 105-71.111 - State plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false State plans. 105-71.111...-Award Requirements § 105-71.111 State plans. (a) Scope. The statutes for some programs require States to submit plans before receiving grants. Under regulations implementing Executive Order 12372...

  1. 7 CFR 3016.11 - State plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false State plans. 3016.11 Section 3016.11 Agriculture... GOVERNMENTS Pre-Award Requirements § 3016.11 State plans. (a) Scope. The statutes for some programs require States to submit plans before receiving grants. Under regulations implementing Executive Order 12372...

  2. Virginia Natural Heritage Program

    Science.gov Websites

    Heritage About Natural Heritage Overview, Mission Natural Heritage Inventory Community Ecology Program ) | Strategic Plan (PDF) | Executive Progress Report (PDF) | Code of Ethics (PDF) Your browser does not support

  3. 32 CFR 813.6 - Planning and requesting combat documentation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Joint Operation Planning and Execution System, that in turn, requests support from HQ AMC. HQ USAF can... 32 National Defense 6 2010-07-01 2010-07-01 false Planning and requesting combat documentation... SALES AND SERVICES VISUAL INFORMATION DOCUMENTATION PROGRAM § 813.6 Planning and requesting combat...

  4. 29 CFR 97.11 - State plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true State plans. 97.11 Section 97.11 Labor Office of the... LOCAL GOVERNMENTS Pre-Award Requirements § 97.11 State plans. (a) Scope. The statutes for some programs require States to submit plans before receiving grants. Under regulations implementing Executive Order...

  5. Perceived Effectiveness of Internal Executive Coaching Engagements by Participants in a High Potential Leadership Development Program

    ERIC Educational Resources Information Center

    Figlar, Marilyn Elizabeth Kraus

    2014-01-01

    The field of executive coaching has grown in popularity as a developmental tool for leaders. With the potential for a leadership continuity gap and the desire for organizations to strengthen leadership talent pools to prepare for succession planning, there is a need for empirical research regarding the effectiveness of executive coaching. The aim…

  6. Implications of DOD Funds Execution Policy for Acquisition Program Management

    DTIC Science & Technology

    2014-08-01

    I N S T I T U T E F O R D E F E N S E A N A L Y S E S IDA Paper P-5164 August 2014 Implications of DOD Funds Execution Policy for Acquisition...One of the goals of sound financial management practice is that the DOD spends the money that Congress appropriates for national defense in a timely...require execution of funds for any particular program to take place later than planned. That situation creates a natural conflict between two

  7. Model Checking Abstract PLEXIL Programs with SMART

    NASA Technical Reports Server (NTRS)

    Siminiceanu, Radu I.

    2007-01-01

    We describe a method to automatically generate discrete-state models of abstract Plan Execution Interchange Language (PLEXIL) programs that can be analyzed using model checking tools. Starting from a high-level description of a PLEXIL program or a family of programs with common characteristics, the generator lays the framework that models the principles of program execution. The concrete parts of the program are not automatically generated, but require the modeler to introduce them by hand. As a case study, we generate models to verify properties of the PLEXIL macro constructs that are introduced as shorthand notation. After an exhaustive analysis, we conclude that the macro definitions obey the intended semantics and behave as expected, but contingently on a few specific requirements on the timing semantics of micro-steps in the concrete executive implementation.

  8. View from the top: CEO perspectives on executive development and succession planning practices in healthcare organizations.

    PubMed

    Groves, Kevin S

    2006-01-01

    Many healthcare professionals question whether the industry's hospitals and multi-site systems are implementing the necessary executive development and succession planning systems to ensure that high potential managers are prepared and aptly selected to assume key executive roles. Survey data, case studies, and cross-industry comparisons suggest that healthcare organizations may face a leadership crisis as the current generation of chief executive officers (CEOs) nears retirement while traditional means of developing the leadership pipeline, including middle-management positions and graduate programs requiring formal residencies, continue to dissipate. Given the daunting challenges that accompany the healthcare industry's quest to identify, develop, and retain leadership talent, this article provides best practice findings from a qualitative study of 13 healthcare organizations with a record of exemplary executive development and succession planning practices. CEOs from six single-site hospitals, six healthcare systems, and one medical group were interviewed to identify industry best practices so that healthcare practitioners and educators may utilize the findings to enhance the industry's leadership capacity.

  9. Place Your BETC on Your Students

    ERIC Educational Resources Information Center

    Cooper, George K.; And Others

    1974-01-01

    Ten categories of vocational teacher competencies have been identified: program planning, development, and evaluation; instruction-planning; instruction-execution; instruction-evaluation; instructional management; guidance; school-community relations; student vocational organization; professional role and development; and coordination. Suggested…

  10. The Boston region metropolitan planning organization public participation program.

    DOT National Transportation Integrated Search

    2007-06-28

    The Boston Region Metropolitan Planning Organization (MPO) is a cooperative board composed of fourteen state, regional, and local entities: the Executive Office of Transportation and Public Works, the Massachusetts Bay Transportation Authority (MBTA)...

  11. Educational planning for utilization of space shuttle (ED-PLUSS). Executive summary: Identification and evaluation of educational uses and users for the STS

    NASA Technical Reports Server (NTRS)

    Engle, H. A.; Christensen, D. L.

    1975-01-01

    The development and application of educational programs to improve public awareness of the space shuttle/space lab capabilities are reported. Special efforts were made to: identify the potential user, identify and analyze space education programs, plan methods for user involvement, develop techniques and programs to encourage new users, and compile follow-on ideas.

  12. Economic Security Environment and Implementation of Planning, Programming, Budgeting, Execution (PPBE) System in Georgia

    DTIC Science & Technology

    2004-06-01

    11 Table 2. Main Macroeconomic Indicators of the State Budget (From: Ref. 21) ...........13 Table 3. State Budget Expenditures...programs with alternative options and Budget Estimations - called Planning, Programming and Budget System (PPBS). The principles and main idea of Defense...about the political fundamentals of building the state, market economy principles , and the advantages of globalization. Georgia was among the first

  13. Review of NASA's Planned Mars Program

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Contents include the following: Executive Summary; Introduction; Scientific Goals for the Exploration of Mars; Overview of Mars Surveyor and Others Mars Missions; Key Issues for NASA's Mars Exploration Program; and Assessment of the Scientific Potential of NASA's Mars Exploration Program.

  14. System cost performance analysis (study 2.3). Volume 1: Executive summary. [unmanned automated payload programs and program planning

    NASA Technical Reports Server (NTRS)

    Campbell, B. H.

    1974-01-01

    A study is described which was initiated to identify and quantify the interrelationships between and within the performance, safety, cost, and schedule parameters for unmanned, automated payload programs. The result of the investigation was a systems cost/performance model which was implemented as a digital computer program and could be used to perform initial program planning, cost/performance tradeoffs, and sensitivity analyses for mission model and advanced payload studies. Program objectives and results are described briefly.

  15. High-Impact Succession Management. Executive Summary

    ERIC Educational Resources Information Center

    Lamoureux, Kim; Campbell, Michael; Smith, Roland

    2009-01-01

    Most companies have an opportunity to improve their succession management programs. The number one challenge for succession management (as identified by both HR leaders and executives) is developing a succession planning strategy. This comprehensive industry study sets out to determine how succession management (when done well) helps improve…

  16. 45 CFR 2550.80 - What are the duties of the State entities?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) The plan is subject to approval by the chief executive officer of the State. (9) The plan must be... national service program that receives financial assistance under section 121 of the NCSA or title II of... Federal financial assistance programs under the Community Services Block Grant Act (42 U.S.C. 9901 et seq...

  17. Utilizing the RE-AIM Framework in formative evaluation and program planning for a healthy food choice intervention in the Lower Mississippi Delta

    USDA-ARS?s Scientific Manuscript database

    A robust approach to program planning is needed for the development and execution of effective and sustainable behavioral interventions with large public health impact. The purpose of this formative research was to apply dimensions of the RE-AIM (i.e., Reach, Effectiveness, Adoption, Implementation,...

  18. A College Marketing Plan That's Working: Final Report. CASE Certification Program in Executive Management.

    ERIC Educational Resources Information Center

    Noll, Gayle

    In response to a 3% decline in fall 1977 enrollments, Odessa College developed and implemented a comprehensive marketing program. After initial planning, a marketing task force and nine mini-task forces were created to deal with the topics of community economic markets, community cultural markets, student retention, student recruitment techniques,…

  19. NASA/HAA Advanced Rotorcraft Technology and Tilt Rotor Workshops. Volume 1: Executive Summary

    NASA Technical Reports Server (NTRS)

    1980-01-01

    This presentation provides an overview of the NASA Rotorcraft Program as an introduction to the technical sessions of the Advanced Rotorcraft Technology Workshop. It deals with the basis for NASA's increasing emphasis on rotorcraft technology, NASA's research capabilities, recent program planning efforts, highlights of its 10-year plan and future directions and opportunities.

  20. Space Station Freedom operations planning

    NASA Technical Reports Server (NTRS)

    Accola, Anne L.; Keith, Bryant

    1989-01-01

    The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.

  1. DOD Product Support Business Case Analysis Guidebook

    DTIC Science & Technology

    2011-04-01

    Mitigation Plans ................................................................................................ 30 4.8 Sensitivity Analysis...Product Support BCA concludes with a recommendation and associated specific actions and an implementation plan to achieve stated organizational...primary executer of the actions and recommendations derived out of the BCA. Within the program office, the PSM has the responsibility to plan

  2. Phase II -- Photovoltaics for Utility Scale Applications (PVUSA): Safety and health action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berg, K.

    1994-09-01

    To establish guidelines for the implementation and administration of an injury and illness prevention program for PVUSA and to assign specific responsibilities for the execution of the program. To provide a basic Safety and Health Action Plan (hereinafter referred to as Plan) that assists management, supervision, and project personnel in the recognition, evaluation, and control of hazardous activities and/or conditions within their respective areas of responsibility.

  3. Solar System Exploration Division Strategic Plan, volume 1. Executive summary and overview

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This first document is the first of a six-volume series presenting the Solar System Exploration Division's Strategic Plan for the 10-year period FY 1994 to FY 2003. The overall strategy is characterized by five fundamental precepts: (1) execute the current program; (2) improve the vitality of the program and the planetary science community; (3) initiate innovative, small, low-cost planetary missions; (4) initiate new major and moderate missions; and (5) prepare for the next generation of missions. This Strategic Plan describes in detail our proposed approach to accomplish these goals. Volume 1 provides first an Executive Summary of highlights of each of the six volumes, and then goes on to present an overview of the plan, including a discussion of the planning context and strategic approach. Volumes 2, 3, 4, and 5 describe in detail the initiatives proposed. An integral part of each of these volumes is a set of responses to the mission selection criteria questions developed by the Space and Earth Science Advisory Committee. Volume 2, Mission From Planet Earth, describes a strategy for exploring the Moon and Mars and sets forth proposed moderate missions--Lunar Observer and a Mars lander network. Volume 3, Pluto Flyby/Neptune Orbiter, discusses our proposed major new start candidate for the FY 1994 to FY 1998 time frame. Volume 4, Discovery, describes the Near-Earth Asteroid Rendezvous, as well as other candidates for this program of low-cost planetary missions. Volume 5, Toward Other Planetary Systems, describes a major research and analysis augmentation that focuses on extrasolar planet detection and the study of planetary system processes. Finally, Volume 6 summarizes the technology program that the division has structured around these four initiatives.

  4. South Dakota ITS/CVO business plan : executive summary

    DOT National Transportation Integrated Search

    1998-01-19

    This report defines an ITS/CVO program for the State of South Dakota. It is a Business Plan to guide the deployment of Intelligent Transportation Systems (ITS) technology for improving commercial vehicle operations (CVO) in South Dakota. This ITS/CVO...

  5. Effects of a 10-week multimodal exercise program on physical and cognitive function of nursing home residents: a psychomotor intervention pilot study.

    PubMed

    Pereira, Catarina; Rosado, Hugo; Cruz-Ferreira, Ana; Marmeleira, José

    2018-05-01

    Nursing home institutionalization tends to exacerbate loss of functioning. Examine the feasibility and the effect of a psychomotor intervention-a multimodal exercise program promoting simultaneous cognitive and motor stimulation-on the executive (planning ability and selective attention) and physical function of nursing home residents. Seventeen participants engaged in a 10-week multimodal exercise program and 17 maintained usual activities. Exercise group improved planning ability (25-32%), selective attention (19-67%), and physical function [aerobic endurance, lower body strength, agility, balance, gait, and mobility (19-41%)], corresponding to an effect size ranging from 0.29 (small) to 1.11 (high), p < 0.05. The multimodal exercise program was feasible and well tolerated. The program improved executive and physical functions of the nursing home residents, reverting the usual loss of both cognitive and motor functioning in older adult institutionalized. Multimodal exercise programs may help to maintain or improve nursing home residents' functioning.

  6. Treatment Planning and Image Guidance for Radiofrequency Ablations of Large Tumors

    PubMed Central

    Ren, Hongliang; Campos-Nanez, Enrique; Yaniv, Ziv; Banovac, Filip; Abeledo, Hernan; Hata, Nobuhiko; Cleary, Kevin

    2014-01-01

    This article addresses the two key challenges in computer-assisted percutaneous tumor ablation: planning multiple overlapping ablations for large tumors while avoiding critical structures, and executing the prescribed plan. Towards semi-automatic treatment planning for image-guided surgical interventions, we develop a systematic approach to the needle-based ablation placement task, ranging from pre-operative planning algorithms to an intra-operative execution platform. The planning system incorporates clinical constraints on ablations and trajectories using a multiple objective optimization formulation, which consists of optimal path selection and ablation coverage optimization based on integer programming. The system implementation is presented and validated in phantom studies and on an animal model. The presented system can potentially be further extended for other ablation techniques such as cryotherapy. PMID:24235279

  7. Executive functioning and dietary intake: Neurocognitive correlates of fruit, vegetable, and saturated fat intake in adults with obesity.

    PubMed

    Wyckoff, Emily P; Evans, Brittney C; Manasse, Stephanie M; Butryn, Meghan L; Forman, Evan M

    2017-04-01

    Obesity is a significant public health issue, and is associated with poor diet. Evidence suggests that eating behavior is related to individual differences in executive functioning. Poor executive functioning is associated with poorer diet (few fruits and vegetables and high saturated fat) in normal weight samples; however, the relationship between these specific dietary behaviors and executive functioning have not been investigated in adults with obesity. The current study examined the association between executive functioning and intake of saturated fat, fruits, and vegetables in an overweight/obese sample using behavioral measures of executive function and dietary recall. One-hundred-ninety overweight and obese adults completed neuropsychological assessments measuring intelligence, planning ability, and inhibitory control followed by three dietary recall assessments within a month prior to beginning a behavioral weight loss treatment program. Inhibitory control and two of the three indices of planning each independently significantly predicted fruit and vegetable consumption such that those with better inhibition and planning ability consumed more fruits and vegetables. No relationship was found between executive functioning and saturated fat intake. Results increase understanding of how executive functioning influences eating behavior in overweight and obese adults, and suggest the importance of including executive functioning training components in dietary interventions for those with obesity. Further research is needed to determine causality as diet and executive functioning may bidirectionally influence each other. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. Hampton Roads, Virginia eight-hour ozone maintenance area transportation conformity analysis : 2030 long range transportation plan and FY 09-12 transportation improvement program, draft executive summary.

    DOT National Transportation Integrated Search

    2010-05-01

    This report presents the regional conformity analysis and recommendation for a finding of conformity for the Hampton Roads 2030 Long Range Transportation Plan (LRTP, or "Plan") and associated Fiscal Year (FY) 2009-2012 Transportation Improvement Prog...

  9. Cost Estimates by Program Mechanism, Appendix K. Vol. II, A Plan for Managing the Development, Implementation and Operation of a Model Elementary Teacher Education Program.

    ERIC Educational Resources Information Center

    Cole, R. D.; Hamreus, D. G.

    This appendix presents the following tables of program component cost estimates: 1) instructional design and development; 2) instructional operations; 3) program management--policy creation and adoption, and policy and program execution; 4) program coordination--instructional objectives, adaptation, accommodation, and dissemination; 5) general…

  10. The language of business: a key nurse executive competency.

    PubMed

    Thomas, Joan; Collins, Allison; Collins, Denton; Herrin, Donna; Dafferner, Deborah; Gabriel, Julie

    2008-01-01

    The ability to interpret fiscal data pertaining to patient outcomes, human resources, customer satisfaction, and financial positions is a vital evidenced-based nurse executive competency. The ability of nurse leaders to influence and contribute in health system executive decision making requires fluency in accounting, "the language of business." After examining challenges faced by nurse executives, faculty at the Loewenberg School of Nursing at the University of Memphis integrated intensive accounting education into a new executive MSN program. Woven throughout the management accounting course is the concept that accounting data must be relevant and accurate for use by organization decision makers. Evidence-based decision making is emphasized when teaching planning and control activities. In addition, fluency in accounting is enhanced which leads to greater skill in patient and nursing advocacy. As competency in management accounting increases through the semester, executive MSN students are encouraged to apply cost accounting course content to their practice settings and to analyze how planning or control activities improve quality outcomes.

  11. Phased project planning and development in anticipation of operational programs

    NASA Technical Reports Server (NTRS)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  12. District Awards for Teacher Excellence (D.A.T.E.) Program: Final Evaluation Report. [Executive Summary

    ERIC Educational Resources Information Center

    Springer, Matthew G.; Lewis, Jessica L.; Ehlert, Mark W.; Podgursky, Michael J.; Crader, Gary D.; Taylor, Lori L.; Gronberg, Timothy J.; Jansen, Dennis W.; Lopez, Omar S.; Stuit, David A.

    2010-01-01

    District Awards for Teacher Excellence (D.A.T.E.) is a state-funded program in Texas that provides grants to districts for the implementation of locally-designed incentive pay plans. All districts in the state are eligible to receive grants, but participation is voluntary. D.A.T.E. incentive pay plans were first implemented in Texas districts…

  13. DORMAN computer program (study 2.5). Volume 1: Executive summary. [development of data bank for computerized information storage of NASA programs

    NASA Technical Reports Server (NTRS)

    Stricker, L. T.

    1973-01-01

    The DORCA Applications study has been directed at development of a data bank management computer program identified as DORMAN. Because of the size of the DORCA data files and the manipulations required on that data to support analyses with the DORCA program, automated data techniques to replace time-consuming manual input generation are required. The Dynamic Operations Requirements and Cost Analysis (DORCA) program was developed for use by NASA in planning future space programs. Both programs are designed for implementation on the UNIVAC 1108 computing system. The purpose of this Executive Summary Report is to define for the NASA management the basic functions of the DORMAN program and its capabilities.

  14. Partnering to Enhance Education and Public Engagement Programs

    NASA Technical Reports Server (NTRS)

    Shupla, C.; Bialeschki, D.; Buxner, S.; Felske, L.; Foxworth, S.; Graff, P.; Peticolas, L.; Shaner, A.; Hackler, A. Smith

    2016-01-01

    Collaborating with partners is a fundamental aspect of the Lunar and Planetary Institute's (LPI) educational and public engagement efforts. Such partnerships enable scientists and educators to include members of the audience in program planning and execution. Ultimately, partnerships strengthen programs by providing diverse resources, expertise, and expanding the potential audience.

  15. 75 FR 42760 - Statement of Organization, Functions, and Delegations of Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... accounting reports and invoices, and monitoring all spending. The Team develops, defends and executes the... results; performance measurement; research and evaluation methodologies; demonstration testing and model... ACF programs; strategic planning; performance measurement; program and policy evaluation; research and...

  16. Advanced space program studies. Overall executive summary

    NASA Technical Reports Server (NTRS)

    Wolfe, M. G.

    1977-01-01

    NASA and DoD requirements and planning data were used in multidiscipline advanced planning investigations of space operations and associated elements (including man), identification of potential low cost approaches, vehicle design, cost synthesis techniques, technology forecasting and opportunities for DoD technology transfer, and the development near-, mid-, and far-term space initiatives and development plans with emphasis on domestic and military commonality. An overview of objectives and results are presented for the following studies: advanced space planning and conceptual analysis, shuttle users, technology assessment and new opportunities, standardization and program practice, integrated STS operations planning, solid spinning upper stage, and integrated planning support functions.

  17. SU-F-T-295: MLCs Performance and Patient-Specific IMRT QA Using Log File Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Osman, A; American University of Biuret Medical Center, Biuret; Maalej, N

    2016-06-15

    Purpose: To analyze the performance of the multi-leaf collimators (MLCs) from the log files recorded during the intensity modulated radiotherapy (IMRT) treatment and to construct the relative fluence maps and do the gamma analysis to compare the planned and executed MLCs movement. Methods: We developed a program to extract and analyze the data from dynamic log files (dynalog files) generated from sliding window IMRT delivery treatments. The program extracts the planned and executed (actual or delivered) MLCs movement, calculates and compares the relative planned and executed fluences. The fluence maps were used to perform the gamma analysis (with 3% dosemore » difference and 3 mm distance to agreement) for 3 IMR patients. We compared our gamma analysis results with those obtained from portal dose image prediction (PDIP) algorithm performed using the EPID. Results: For 3 different IMRT patient treatments, the maximum difference between the planned and the executed MCLs positions was 1.2 mm. The gamma analysis results of the planned and delivered fluences were in good agreement with the gamma analysis from portal dosimetry. The maximum difference for number of pixels passing the gamma criteria (3%/3mm) was 0.19% with respect to portal dosimetry results. Conclusion: MLC log files can be used to verify the performance of the MLCs. Patientspecific IMRT QA based on MLC movement log files gives similar results to EPID dosimetry results. This promising method for patient-specific IMRT QA is fast, does not require dose measurements in a phantom, can be done before the treatment and for every fraction, and significantly reduces the IMRT workload. The author would like to thank King Fahd University of petroleum and Minerals for the support.« less

  18. A strategy for health promotion at multiple corporate sites.

    PubMed

    Alexy, B; Eynon, D

    1991-02-01

    1. The logistical problems associated with delivery of health promotion programs at multiple corporate sites can be addressed through the use of health education packets. 2. The role of the nurse or health coordinator is critical in assisting and guiding the employee as the health plan is executed. 3. Problematic areas related to implementation of programs at remote sites can be alleviated through careful planning and extensive communication. 4. Advertising, input from employees and staff, and follow up are important in the success of a program.

  19. Functional behavioral analysis and social scripting for the older patient with schizophrenia: a staff development program.

    PubMed

    Markwick, Laura; Smith, Charlene; Mick, Diane

    2014-11-01

    Executive functioning is the ability to plan, strategize, organize, and focus on details. Impaired executive functioning plays a significant role in behavior disturbances. Lack of inhibition, impaired abstract reasoning, thought perseverance, rigidity in routine, and lack of insight disrupt social skills and daily life. Autism and schizophrenia present some similar behaviors, including impaired executive functioning, often resulting in pharmacological management as many healthcare professionals receive limited training in executive functioning. Non-pharmacological tools used in autism for behavior management include functional behavioral analysis and social scripting, which help to identify causes of behavior and teach more appropriate behavioral responses. Described here is an educational program for healthcare workers in a long-term care skilled nursing facility, to help them understand the basis for behaviors in individuals with impaired executive function, to use these same tools for behavioral modification techniques, and to help patients learn more appropriate social skills. Program evaluation suggested the educational program was successful in increasing the staff's knowledge and comfort level in addressing the behavioral issues that arise with this population and staff also reported less use of medication as first-line treatment for behavioral issues.

  20. 17 CFR 39.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., the provision of clearing and settlement services, risk management, or oversight of compliance with... recovery planning or program execution. Stress test means a test that compares the impact of potential...

  1. Two-Year Impact of a Mindfulness-Based Program on Preschoolers' Self-Regulation and Academic Performance

    ERIC Educational Resources Information Center

    Thierry, Karen L.; Bryant, Heather L.; Nobles, Sandra Speegle; Norris, Karen S.

    2016-01-01

    Research Findings: Students experienced a mindfulness program designed to enhance their self-regulation in prekindergarten and kindergarten. At the end of the 1st year of the program, these students showed improvements in teacher-reported executive function skills, specifically related to working memory and planning and organizing, whereas…

  2. Guide to Conducting a Language Immersion/Homestay Program.

    ERIC Educational Resources Information Center

    Drysdale, Susan; Killelea, Frances

    This handbook, designed to assist foreign language teachers in planning and executing a language immersion/homestay program for their students, is based on a successful program in Switzerland undertaken by Northport (New York) High School French teachers in 1980. The material is presented in three parts: (1) preparation of the exchange, including…

  3. We the People: Law Day USA 1987. 1987 Planning Guide.

    ERIC Educational Resources Information Center

    American Bar Association, Chicago, IL.

    "We the People" is the theme for the 1987 American Bar Association's 30th annual Law Day USA, observed May 1. This guide brings together information to help plan and execute programs which call attention to the principles and practices of United States law and justice. The guide contains facts about Law Day; tips for planning a Law Day…

  4. 75 FR 9250 - Plan for the Use and Distribution of the Confederated Tribes of the Warm Springs Reservation of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... 18, 2009, because a joint resolution disapproving it was not enacted. The plan reads as follows: Plan...-governance over all of the forestry and natural resource management programs relating to the Tribe's On... the Tribe for use as it decided at its sole discretion, upon the execution by the Tribe and the...

  5. Water Management Planning: A Case Study at Blue Grass Army Depot

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Solana, Amy E.; Mcmordie, Katherine

    2006-04-03

    Executive Order 13123, Greening the Government Through Efficient Energy Management, mandates an aggressive policy for reducing potable water consumption at federal facilities. Implementation guid¬ance from the U.S. Department of Energy (DOE) set a requirement for each federal agency to “reduce potable water usage by implementing life cycle, cost-effective water efficiency programs that include a water management plan, and not less than four Federal Energy Management Program (FEMP) Best Manage¬ment Practices (BMPs).” The objective of this plan is to gain full compliance with Executive Order 13123 and associated DOE implementation guidance on behalf of Blue Grass Army Depot (BGAD), Richmond, Kentucky.more » In accordance with this plan, BGAD must: • Incorporate the plan as a component of the Installation energy conservation plan • Investigate the water savings potential and life-cycle cost effectiveness of the Operations and Maintenance (O&M) and retrofit/replacement options associated with the ten FEMP BMPs • Put into practice all applicable O&M options • Identify retrofit/replacement options appropriate for implementation (based upon calculation of the simple payback periods) • Establish a schedule for implementation of applicable and cost-effective retrofit/replacement options.« less

  6. Partnerships for Policy Development: A Case Study From Uganda’s Costed Implementation Plan for Family Planning

    PubMed Central

    Lipsky, Alyson B; Gribble, James N; Cahaelen, Linda; Sharma, Suneeta

    2016-01-01

    ABSTRACT In global health, partnerships between practitioners and policy makers facilitate stakeholders in jointly addressing those issues that require multiple perspectives for developing, implementing, and evaluating plans, strategies, and programs. For family planning, costed implementation plans (CIPs) are developed through a strategic government-led consultative process that results in a detailed plan for program activities and an estimate of the funding required to achieve an established set of goals. Since 2009, many countries have developed CIPs. Conventionally, the CIP approach has not been defined with partnerships as a focal point; nevertheless, cooperation between key stakeholders is vital to CIP development and execution. Uganda launched a CIP in November 2014, thus providing an opportunity to examine the process through a partnership lens. This article describes Uganda’s CIP development process in detail, grounded in a framework for assessing partnerships, and provides the findings from 22 key informant interviews. Findings reveal strengths in Uganda’s CIP development process, such as willingness to adapt and strong senior management support. However, the evaluation also highlighted challenges, including district health officers (DHOs), who are a key group of implementers, feeling excluded from the development process. There was also a lack of planning around long-term partnership practices that could help address anticipated execution challenges. The authors recommend that future CIP development efforts use a long-term partnership strategy that fosters accountability by encompassing both the short-term goal of developing the CIP and the longer-term goal of achieving the CIP objectives. Although this study focused on Uganda’s CIP for family planning, its lessons have implications for any policy or strategy development efforts that require multiple stakeholders to ensure successful execution. PMID:27353621

  7. 24 CFR 578.59 - Project administrative costs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... URBAN DEVELOPMENT COMMUNITY FACILITIES CONTINUUM OF CARE PROGRAM Program Components and Eligible Costs... 10 percent of any grant awarded under this part, excluding the amount for Continuum of Care Planning... execution of Continuum of Care activities. This does not include staff and overhead costs directly related...

  8. 24 CFR 578.59 - Project administrative costs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... URBAN DEVELOPMENT COMMUNITY FACILITIES CONTINUUM OF CARE PROGRAM Program Components and Eligible Costs... 10 percent of any grant awarded under this part, excluding the amount for Continuum of Care Planning... execution of Continuum of Care activities. This does not include staff and overhead costs directly related...

  9. SITE DEMONSTRATION OF THE BASIC EXTRACTIVE SLUDGE TREATMENT PROCESS

    EPA Science Inventory

    The Superfund Innovative Technology Evaluation (SITE) Program, in cooperation with EPA Region 5, the Great Lakes National Program Office (GLNPO), and the U.S. Army Corps of Engineers (COE) planned and executed a pilot-scla e evaluation of the Basic Extyractive Sludge Treatment (B...

  10. The Capability Portfolio Analysis Tool (CPAT): A Mixed Integer Linear Programming Formulation for Fleet Modernization Analysis (Version 2.0.2).

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Waddell, Lucas; Muldoon, Frank; Henry, Stephen Michael

    In order to effectively plan the management and modernization of their large and diverse fleets of vehicles, Program Executive Office Ground Combat Systems (PEO GCS) and Program Executive Office Combat Support and Combat Service Support (PEO CS&CSS) commis- sioned the development of a large-scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This paper contains a thor-more » ough documentation of the terminology, parameters, variables, and constraints that comprise the fleet management mixed integer linear programming (MILP) mathematical formulation. This paper, which is an update to the original CPAT formulation document published in 2015 (SAND2015-3487), covers the formulation of important new CPAT features.« less

  11. Identifying Executable Plans

    NASA Technical Reports Server (NTRS)

    Bedrax-Weiss, Tania; Jonsson, Ari K.; Frank, Jeremy D.; McGann, Conor

    2003-01-01

    Generating plans for execution imposes a different set of requirements on the planning process than those imposed by planning alone. In highly unpredictable execution environments, a fully-grounded plan may become inconsistent frequently when the world fails to behave as expected. Intelligent execution permits making decisions when the most up-to-date information is available, ensuring fewer failures. Planning should acknowledge the capabilities of the execution system, both to ensure robust execution in the face of uncertainty, which also relieves the planner of the burden of making premature commitments. We present Plan Identification Functions (PIFs), which formalize what it means for a plan to be executable, md are used in conjunction with a complete model of system behavior to halt the planning process when an executable plan is found. We describe the implementation of plan identification functions for a temporal, constraint-based planner. This particular implementation allows the description of many different plan identification functions. characteristics crf the xectieonfvii rnm-enft,h e best plan to hand to the execution system will contain more or less commitment and information.

  12. Evaluation of the Academic Occupational Program of the County of Leduc, From September, 1981 to June, 1984. Executive Summary.

    ERIC Educational Resources Information Center

    Nyberg, V. R.

    The paper reports results of an academic occupational program intended for educable mentally handicapped and learning disabled secondary students in Leduc, Alberta. An introduction reviews history of the program and the evaluation process. The evaluation plan, based on R. Stake's model for program evaluation, is described, and sources of data…

  13. Deferred compensation for tax-exempt entities.

    PubMed

    Rich, C; Jenkins, G E

    1993-10-01

    Many executives in tax-exempt organizations, including healthcare executives, find their tax-advantaged savings opportunities dramatically reduced today compared to previous years. The benefit of employer-sponsored, "qualified" retirement and savings programs has been severely limited by ever-increasing tax restrictions on such plans when they are offered by tax-exempt organizations. And the opportunity for tax-sheltered personal investments has virtually disappeared. One of the last remaining opportunities for tax-advantaged savings in tax-exempt organizations is an employer-sponsored, non-qualified, deferred compensation plan, an option that appears increasingly attractive in light of the recently enacted increased personal tax rates.

  14. Study 2.5 final report. DORCA computer program. Volume 4: Executive summary report

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The functions and capabilities of the Dynamic Operational Requirements and Cost Analysis Program are explained. The existence and purpose of the program are presented to provide an evaluation of program applicability to areas of responsibility for potential users. The implementation of the program on the Univac 1108 computer is discussed. The application of the program for mission planning and project management is described.

  15. An innovative approach for distributed and integrated resources planning for the Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda S.; Shinkle, Gerald L.; Weiler, Jerry D.; Willoughby, John K.

    1990-01-01

    This paper presents a planning approach to the Space Station Freedom program which takes into account the widely distributed nature of that program. The program management structure is organized into three major levels: a strategic level, a tactical level, and an execution level. For each level, resource availabilities are determined, the resources are distributed, schedules are built independently within the resource limits, the schedules are integrated into a single schedule, and conflicts are resolved by negotiating requirements and/or relaxing contraints. This approach distributes resources to multiple planning entities in such a way that when the multiple plans are collected, they fit together with minimal modification. The up-front distribution is planned in such a way and to a sufficient degree that a fit is virtually assured.

  16. The Further Development of the Conceptual Model and Operational Dimensions of the AASA National Academy for School Executives. Final Report.

    ERIC Educational Resources Information Center

    Curtis, William H.; And Others

    The main purpose of this project was to develop a blueprint for the future growth of the AASA-National Academy for School Executives. The resulting comprehensive model is displayed in outline form through the use of a conceptual framework that includes three major processes -- program planning and development, implementation, and evaluation. Each…

  17. 17 CFR 39.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... provision of clearing and settlement services, risk management, or oversight of compliance with the Act and... planning or program execution. Stress test means a test that compares the impact of potential extreme price...

  18. 17 CFR 39.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... provision of clearing and settlement services, risk management, or oversight of compliance with the Act and... planning or program execution. Stress test means a test that compares the impact of potential extreme price...

  19. Establishing a nursing strategic agenda: the whys and wherefores.

    PubMed

    Young, Claire

    2008-01-01

    The health system nursing leader is responsible for providing high-quality, service-oriented nursing care to deliver such care with disciplined cost management; to lead and develop a group of nursing executives and managers at the facility level; to establish nursing professional development programs; to build and maintain an effective supply of nurses; and to advocate for nurses and patients. Balancing these imperatives requires thoughtful strategic planning and disciplined execution. In their absence, organizations flounder to address a single problem in isolation and struggle to perform against outcomes. One organization approached the challenge by engaging in a comprehensive, accelerated strategic planning process. The experience brought together 11 hospital nursing executives in consensus around a prioritized strategic agenda. This article is a case study of the approach used to define a nursing agenda.

  20. Educational Project Management Instructional System. Module One. Project Management Executive Orientation.

    ERIC Educational Resources Information Center

    Cummings, C. Peter; Cook, Desmond L.

    This module is the first in a self-instructional program designed to train public school personnel in how to manage educational projects. These may include federally funded projects (such as Title I projects), court-ordered programs (such as a desegregation plan), or locally initiated projects (such as a new math program). The purpose of this…

  1. Developing fire management mixes for fire program planning

    Treesearch

    Armando González-Cabán; Patricia B. Shinkle; Thomas J. Mills

    1986-01-01

    Evaluating economic efficiency of fire management program options requires information on the firefighting inputs, such as vehicles and crews, that would be needed to execute the program option selected. An algorithm was developed to translate automatically dollars allocated to type of firefighting inputs to numbers of units, using a set of weights for a specific fire...

  2. Benefits of Hybrid Classes in Community Colleges

    ERIC Educational Resources Information Center

    Barker, Joel

    2015-01-01

    This article discusses hybrid courses and their impact on educational facilities, their students, and instructors. Instructors now have over ten years of data related to hybrid courses and by trial and error have devised different strategies to plan and execute lesson plans via partly online forums. Programs are in place that give students the…

  3. Education Strategic Plan 2015-2035: Advancing NOAA's Mission through Education. Executive Summary

    ERIC Educational Resources Information Center

    National Oceanic and Atmospheric Administration, 2016

    2016-01-01

    The National Oceanic and Atmospheric Administration (NOAA) Education Strategic Plan provides a framework to guide collaboration across the NOAA education community and a structure in which to track and report progress. Congress recognized the importance of NOAA's education programs with the passage of the America COMPETES Act. The America COMPETES…

  4. Jobs for Indiana's Future. Executive Report.

    ERIC Educational Resources Information Center

    Jobs for the Future, Inc., West Somerville, MA.

    This report summarizes the work of the Jobs for Indiana's Future (JIF) program, designed to provide the Indiana Commission on Vocational and Technical Education (ICVTE) with assistance in planning for the future by enhancing ICVTE's capacity to guide Indiana's human capital investment strategy. The JIF program undertook an extensive analysis of…

  5. Environmental Justice, Sustainability and Education at the U.S. Environmental Protection Agency

    EPA Science Inventory

    Some of the supporting statutes and executive orders, current plans, recent research and tools, and training programs relating to sustainability, environmental justice and environmental education are presented.

  6. Integrated System for Autonomous Science

    NASA Technical Reports Server (NTRS)

    Chien, Steve; Sherwood, Robert; Tran, Daniel; Cichy, Benjamin; Davies, Ashley; Castano, Rebecca; Rabideau, Gregg; Frye, Stuart; Trout, Bruce; Shulman, Seth; hide

    2006-01-01

    The New Millennium Program Space Technology 6 Project Autonomous Sciencecraft software implements an integrated system for autonomous planning and execution of scientific, engineering, and spacecraft-coordination actions. A prior version of this software was reported in "The TechSat 21 Autonomous Sciencecraft Experiment" (NPO-30784), NASA Tech Briefs, Vol. 28, No. 3 (March 2004), page 33. This software is now in continuous use aboard the Earth Orbiter 1 (EO-1) spacecraft mission and is being adapted for use in the Mars Odyssey and Mars Exploration Rovers missions. This software enables EO-1 to detect and respond to such events of scientific interest as volcanic activity, flooding, and freezing and thawing of water. It uses classification algorithms to analyze imagery onboard to detect changes, including events of scientific interest. Detection of such events triggers acquisition of follow-up imagery. The mission-planning component of the software develops a response plan that accounts for visibility of targets and operational constraints. The plan is then executed under control by a task-execution component of the software that is capable of responding to anomalies.

  7. National NIF Diagnostic Program Fiscal Year 2002 Second Quarter Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacGowan, B

    Since October 2001 the development of the facility diagnostics for NIF has been funded by the NIF Director through the National NIF Diagnostic Program (NNDP). The current emphasis of the NNDP is on diagnostics for the early NIF quad scheduled to be available for experiment commissioning in FY03. During the past six months the NNDP has set in place processes for funding diagnostics, developing requirements for diagnostics, design reviews and monthly status reporting. Those processes are described in an interim management plan for diagnostics (''National NIF Diagnostic Program Interim Plan'', NIF-0081315, April 2002) and a draft Program Execution Plan (''Programmore » Execution Plan for the National NlF Diagnostic Program'', NIF-0072083, October 2001) and documents cited therein. Work has been funded at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Naval Research Laboratory (NRL), Sandia National Laboratories (SNL), Bechtel Nevada at Los Alamos and Santa Barbara. There are no major technical risks with the early diagnostics. The main concerns relate to integration of the diagnostics into the facility, all such issues are being worked. This report is organized to show the schedule and budget status and a summary of Change Control Board actions for the past six months. The following sections then provide short descriptions of the status of each diagnostic. Where design reviews or requirements documents are cited, the documents are available on the Diagnostics file server or on request.« less

  8. Defense Acquisitions: Assessments of Selected Weapon Programs

    DTIC Science & Technology

    2008-03-01

    system configuration changes could enable department officials to make more informed decisions in the early stages of a program and better match...accountability in the execution of each program would alleviate untimely decision making when programs do get into trouble. The current DOD leadership has...require that we plan and perform the audit to obtain sufficient, appropriate evidence to provide a reasonable basis for our findings and conclusions

  9. An expert system executive for automated assembly of large space truss structures

    NASA Technical Reports Server (NTRS)

    Allen, Cheryl L.

    1993-01-01

    Langley Research Center developed a unique test bed for investigating the practical problems associated with the assembly of large space truss structures using robotic manipulators. The test bed is the result of an interdisciplinary effort that encompasses the full spectrum of assembly problems - from the design of mechanisms to the development of software. The automated structures assembly test bed and its operation are described, the expert system executive and its development are detailed, and the planned system evolution is discussed. Emphasis is on the expert system implementation of the program executive. The executive program must direct and reliably perform complex assembly tasks with the flexibility to recover from realistic system errors. The employment of an expert system permits information that pertains to the operation of the system to be encapsulated concisely within a knowledge base. This consolidation substantially reduced code, increased flexibility, eased software upgrades, and realized a savings in software maintenance costs.

  10. FY 2016 Annual Performance Report

    EPA Pesticide Factsheets

    Presents detailed performance results, as measured against the targets established in EPA’s FY 2016 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2016 program evaluations.

  11. FY 2017 Annual Performance Report (APR)

    EPA Pesticide Factsheets

    Presents detailed performance results, as measured against the targets established in EPA’s FY 2017 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2017 program evaluations.

  12. FY 2015 Annual Performance Report

    EPA Pesticide Factsheets

    Presents detailed performance results, as measured against the targets established in EPA’s FY 2015 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2015 program evaluations.

  13. A Guide for Understanding Health Education and Promotion Programs.

    PubMed

    Kim, Richard W; Nahar, Vinayak K

    2018-03-01

    Planning, Implementing & Evaluating Health Promotion Programs: A Primer is a versatile and comprehensive resource on the theoretical and practical underpinnings of successful health promotion programs. The requirements for effective health promotion program development are presented with frequent use of practical planning examples, pedagogical devices, and expert rationale. Ideal for undergraduate and graduate students in health education, promotion, and planning courses, this 15-chapter textbook is organized in a manner that specifically addresses the responsibilities and competencies required of health education specialists as published in the Health Education Specialist Practice Analysis of 2015. The authors of this textbook are leaders in the field and provide readers with the skills necessary to carry out the full process of health promotion program execution, while also offering direct preparation for CHES and MCHES licensing exams.

  14. Development and content validity of the CENA Program for Educational Training on the Neuropsychology of Learning, with an emphasis on executive functions and attention.

    PubMed

    Pureza, Janice R; Fonseca, Rochele P

    2017-01-01

    The importance of executive functions (EF) in childhood development, and their role as indicators of health, well-being, professional and academic success have been demonstrated by several studies in the literature. FE are cognitive processes that aim to control and manage behavior to achieve specific goal and included skills planning, inhibition, cognitive flexibility, (executive) attention and the central executive component of working memory (WM). In the context of education, the EF are crucial for continued learning and efficient academic performance due to their involvement in several components of the educational process. The aim of this article was to describe the development and content validity of the CENA Program for Educational Training on the Neuropsychology of Learning, with an emphasis on executive functions and attention. The study involved seven specialists (four responsible for evaluating the program, and three involved in brainstorming), and was carried out in three stages:Background research: neuropsychology and education;Program development - author brainstorming andEvaluation by expert judges The goals, language and methods. CENA Program were considered adequate, attesting to its content validity as a school-based neuropsychological intervention. Teacher training in school neuropsychology may be an important area for future investment and contribute to academic achievement and student development in the Brazilian education system.

  15. Development and content validity of the CENA Program for Educational Training on the Neuropsychology of Learning, with an emphasis on executive functions and attention

    PubMed Central

    Pureza, Janice R.; Fonseca, Rochele P.

    2017-01-01

    Introduction The importance of executive functions (EF) in childhood development, and their role as indicators of health, well-being, professional and academic success have been demonstrated by several studies in the literature. FE are cognitive processes that aim to control and manage behavior to achieve specific goal and included skills planning, inhibition, cognitive flexibility, (executive) attention and the central executive component of working memory (WM). In the context of education, the EF are crucial for continued learning and efficient academic performance due to their involvement in several components of the educational process. Objective The aim of this article was to describe the development and content validity of the CENA Program for Educational Training on the Neuropsychology of Learning, with an emphasis on executive functions and attention. Methods The study involved seven specialists (four responsible for evaluating the program, and three involved in brainstorming), and was carried out in three stages: Background research: neuropsychology and education; Program development - author brainstorming and Evaluation by expert judges The goals, language and methods. Results CENA Program were considered adequate, attesting to its content validity as a school-based neuropsychological intervention. Conclusion Teacher training in school neuropsychology may be an important area for future investment and contribute to academic achievement and student development in the Brazilian education system. PMID:29213497

  16. Satellite Surveillance: Domestic Issues

    DTIC Science & Technology

    2008-06-27

    agents . Satellite imagery undergirded U.S. strategic planning for a quarter century and a series of arms control agreements with the Soviet Union. In...individual agencies; another would be to have one agency serve as the executive agent for a program. See Remarks and Q&A by the Principal Deputy...Antonio, Texas, October 23, 2007. as the executive agent of what it termed a new Domestic Applications Office (DAO). This recommendation was based on the

  17. Software for Automation of Real-Time Agents, Version 2

    NASA Technical Reports Server (NTRS)

    Fisher, Forest; Estlin, Tara; Gaines, Daniel; Schaffer, Steve; Chouinard, Caroline; Engelhardt, Barbara; Wilklow, Colette; Mutz, Darren; Knight, Russell; Rabideau, Gregg; hide

    2005-01-01

    Version 2 of Closed Loop Execution and Recovery (CLEaR) has been developed. CLEaR is an artificial intelligence computer program for use in planning and execution of actions of autonomous agents, including, for example, Deep Space Network (DSN) antenna ground stations, robotic exploratory ground vehicles (rovers), robotic aircraft (UAVs), and robotic spacecraft. CLEaR automates the generation and execution of command sequences, monitoring the sequence execution, and modifying the command sequence in response to execution deviations and failures as well as new goals for the agent to achieve. The development of CLEaR has focused on the unification of planning and execution to increase the ability of the autonomous agent to perform under tight resource and time constraints coupled with uncertainty in how much of resources and time will be required to perform a task. This unification is realized by extending the traditional three-tier robotic control architecture by increasing the interaction between the software components that perform deliberation and reactive functions. The increase in interaction reduces the need to replan, enables earlier detection of the need to replan, and enables replanning to occur before an agent enters a state of failure.

  18. Evaluation of a Crisis-Preparedness Training Program for the Faculty of a Private Elementary School

    ERIC Educational Resources Information Center

    Boyle, Marybeth N.

    2010-01-01

    The purpose of this study was to determine the effectiveness of a training program for the faculty of a private elementary school on executing the protocols, roles, and responsibilities defined in the institution's crisis-management plan. A formal training program for the faculty had not been developed, and administrators had no measure by which…

  19. Mental object rotation and the planning of hand movements.

    PubMed

    Wohlschläger, A

    2001-05-01

    Recently, we showed that the simultaneous execution of rotational hand movements interferes with mental object rotation, provided that the axes of rotation coincide in space. We hypothesized that mental object rotation and the programming of rotational hand movements share a common process presumably involved in action planning. Two experiments are reported here that show that the mere planning of a rotational hand movement is sufficient to cause interference with mental object rotation. Subjects had to plan different spatially directed hand movements that they were asked to execute only after they had solved a mental object rotation task. Experiment 1 showed that mental object rotation was slower if hand movements were planned in a direction opposite to the presumed mental rotation direction, but only if the axes of hand rotation and mental object rotation were parallel in space. Experiment 2 showed that this interference occurred independent of the preparatory hand movements observed in Experiment 1. Thus, it is the planning of hand movements and not their preparation or execution that interferes with mental object rotation. This finding underlines the idea that mental object rotation is an imagined (covert) action, rather than a pure visual-spatial imagery task, and that the interference between mental object rotation and rotational hand movements is an interference between goals of actions.

  20. Effectively executing a comprehensive marketing communication strategy.

    PubMed

    Gombeski, William R; Taylor, Jan; Piccirilli, Ami; Cundiff, Lee; Britt, Jason

    2007-01-01

    Marketers are under increasing scrutiny from their management to demonstrate accountability for the resources they receive. Three models are presented to help marketers execute their customer communication activities more effectively. Benefits of using the "Identification of Strategic Communication Elements," "Business Communication" and "Communications Management Process" models include (1) more effective upfront strategic and tactical planning, (2) ensuring key communication principles are addressed, (3) easier communication program communication, (4) provides a framework for program evaluation and market research and (5) increases the creative thinking marketers need when addressing the major marketing challenges. The ultimate benefit is the greater likelihood of more positive marketing results.

  1. Space station needs, attributes and architectural options study. Final executive review

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Identification and validation of missions, the benefits of manned presence in space, attributes and architectures, space station requirements, orbit selection, space station architectural options, technology selection, and program planning are addressed.

  2. Report: Improvements Needed in Key EPA Information System Security Practices

    EPA Pesticide Factsheets

    Report #10-P-0146, June 15, 2010. Williams Adley found that EPA program offices lacked evidence that they planned and executed tests of information system security controls as required by federal requirements.

  3. Action Research: Its Origins and Early Application.

    ERIC Educational Resources Information Center

    Cook, Stuart W.

    This paper contains informal remarks on action research in social psychology from its post World War II origins to its current status. Kurt Lewin first described action research in the 1946 article, "Action Research and Minority Problems," as a three-step process of program planning, program execution, and follow-up evaluation. Ronald Lippitt and…

  4. Study of CETA Plans and Reservation Economic Development. Executive Summary.

    ERIC Educational Resources Information Center

    Fazio, Ernest J., Jr.; Kelly, Patricia F.

    Field study and analysis of program documents were undertaken in the first phase of a multi-phased research effort to improve and strengthen the relationships between CETA programs and economic development activities on Indian reservations. Exploratory in nature, the study examined the approaches developed by 24 Indian reservations and Native…

  5. Single Parents' Attitudes toward and Use of Government and Community Assistance: A Needs Assessment To Plan Interventions That Preserve Family Function and Lower the Risk of Poverty. Final Report and Executive Summary.

    ERIC Educational Resources Information Center

    Brown, J. Lynne; Jensen, Leif; Mastrofski, Jennifer

    Interviews with 107 rural divorced, single mothers in 6 Pennsylvania counties examined their use of and attitudes toward community assistance programs, workfare, and educational programs. Many respondents had used welfare and nutrition programs and felt the programs were needed. However, they felt that child feeding programs were more accessible…

  6. Design and Implementation of an International Training Program on Repository Development and Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vugrin, K.W.; Twitchell, Ch.A.

    2008-07-01

    Korea Hydro and Nuclear Power Co., Ltd. (KHNP) is an electric company in the Republic of Korea with twenty operational nuclear power plants and eight additional units that are either planned or currently under construction. Regulations require that KHNP manage the radioactive waste generated by their nuclear power plants. In the course of planning low, intermediate, and high level waste storage facilities, KHNP sought interaction with an acknowledged expert in the field of radioactive waste management and, consequently, contacted Sandia National Laboratories (SNL). KHNP has contracted with SNL to provide a year long training program on repository science. This papermore » discusses the design of the curriculum, specific plans for execution of the training program, and recommendations for smooth implementation of international training programs. (authors)« less

  7. 32 CFR 158.4 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... program management processes during applicable contingency operations. (2) Comply with applicable U.S..., “Policy and Procedures for Determining Workforce Mix.” (4) Fully consider, plan for, integrate, and execute acquisition of, contracted support, including synchronizing and integrating contracted support...

  8. 32 CFR 158.4 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... program management processes during applicable contingency operations. (2) Comply with applicable U.S..., “Policy and Procedures for Determining Workforce Mix.” (4) Fully consider, plan for, integrate, and execute acquisition of, contracted support, including synchronizing and integrating contracted support...

  9. 32 CFR 158.4 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... program management processes during applicable contingency operations. (2) Comply with applicable U.S..., “Policy and Procedures for Determining Workforce Mix.” (4) Fully consider, plan for, integrate, and execute acquisition of, contracted support, including synchronizing and integrating contracted support...

  10. Planning fuel-conservative descents in an airline environmental using a small programmable calculator: Algorithm development and flight test results

    NASA Technical Reports Server (NTRS)

    Knox, C. E.; Vicroy, D. D.; Simmon, D. A.

    1985-01-01

    A simple, airborne, flight-management descent algorithm was developed and programmed into a small programmable calculator. The algorithm may be operated in either a time mode or speed mode. The time mode was designed to aid the pilot in planning and executing a fuel-conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The speed model was designed for planning fuel-conservative descents when time is not a consideration. The descent path for both modes was calculated for a constant with considerations given for the descent Mach/airspeed schedule, gross weight, wind, wind gradient, and nonstandard temperature effects. Flight tests, using the algorithm on the programmable calculator, showed that the open-loop guidance could be useful to airline flight crews for planning and executing fuel-conservative descents.

  11. Planning fuel-conservative descents in an airline environmental using a small programmable calculator: algorithm development and flight test results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knox, C.E.; Vicroy, D.D.; Simmon, D.A.

    A simple, airborne, flight-management descent algorithm was developed and programmed into a small programmable calculator. The algorithm may be operated in either a time mode or speed mode. The time mode was designed to aid the pilot in planning and executing a fuel-conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The speed model was designed for planning fuel-conservative descents when time is not a consideration. The descent path for both modes was calculated for a constant with considerations given for the descent Mach/airspeed schedule, gross weight, wind, wind gradient, andmore » nonstandard temperature effects. Flight tests, using the algorithm on the programmable calculator, showed that the open-loop guidance could be useful to airline flight crews for planning and executing fuel-conservative descents.« less

  12. An Engineering Report in Civil Engineering and Management.

    DTIC Science & Technology

    1987-12-01

    programs as the Apollo program and the Canaveral program. Progress in the late 70s and the 80s has seen advancements in the application of sophisticated...other forces in military operations; subsequent combat service support ashore and defense against overt or clandestine enemy attacks directed toward...construction execution plans; assigns construction projects to NCF units; monitors progress and assures adherence to quality standards: directs

  13. Plan Execution Interchange Language (PLEXIL)

    NASA Technical Reports Server (NTRS)

    Estlin, Tara; Jonsson, Ari; Pasareanu, Corina; Simmons, Reid; Tso, Kam; Verma, Vandi

    2006-01-01

    Plan execution is a cornerstone of spacecraft operations, irrespective of whether the plans to be executed are generated on board the spacecraft or on the ground. Plan execution frameworks vary greatly, due to both different capabilities of the execution systems, and relations to associated decision-making frameworks. The latter dependency has made the reuse of execution and planning frameworks more difficult, and has all but precluded information sharing between different execution and decision-making systems. As a step in the direction of addressing some of these issues, a general plan execution language, called the Plan Execution Interchange Language (PLEXIL), is being developed. PLEXIL is capable of expressing concepts used by many high-level automated planners and hence provides an interface to multiple planners. PLEXIL includes a domain description that specifies command types, expansions, constraints, etc., as well as feedback to the higher-level decision-making capabilities. This document describes the grammar and semantics of PLEXIL. It includes a graphical depiction of this grammar and illustrative rover scenarios. It also outlines ongoing work on implementing a universal execution system, based on PLEXIL, using state-of-the-art rover functional interfaces and planners as test cases.

  14. Manager's assistant systems for space system planning

    NASA Technical Reports Server (NTRS)

    Bewley, William L.; Burnard, Robert; Edwards, Gary E.; Shoop, James

    1992-01-01

    This paper describes a class of knowledge-based 'assistant' systems for space system planning. Derived from technology produced for the DARPA/USAF Pilot's Associate program, these assistant systems help the human planner by doing the bookkeeping to maintain plan data and executing the procedures and heuristics currently used by the human planner to define, assess, diagnose, and revise plans. Intelligent systems for Space Station Freedom assembly sequence planning and Advanced Launch System modeling will be presented as examples. Ongoing NASA-funded work on a framework supporting the development of such tools will also be described.

  15. An Implementation Plan: One-to-One Laptop Program Recommendations for the Pittsgrove Township School District

    ERIC Educational Resources Information Center

    Brodzik, Michael C.

    2012-01-01

    This Executive Position Paper is a one-to-one laptop implementation plan for Pittsgrove Township Schools that can be used as a template for other districts with similar interests. Each of the three chapters fulfills a major purpose. In Chapter One the paper is designed to substantiate the need for the Pittsgrove Township School District to…

  16. Measuring Turbulence Mixing in Indonesian Seas Using Microstructure EM-APEX Floats

    DTIC Science & Technology

    We developed scientific plans for collaborative observational programs with Indonesian,Taiwanese, and Japanese researchers. We worked with Taiwanese...and Japanese researchers to plan and execute turbulence experiments using autonomous platforms in the SCS and Kuroshio Current. Our primary platform...and the Applied Physics Laboratory, University of Washington. We are working closely with Japanese collaborators to develop a turbulence observation

  17. Developing a treatment planning process and software for improved translation of photodynamic therapy

    NASA Astrophysics Data System (ADS)

    Cassidy, J.; Zheng, Z.; Xu, Y.; Betz, V.; Lilge, L.

    2017-04-01

    Background: The majority of de novo cancers are diagnosed in low and middle-income countries, which often lack the resources to provide adequate therapeutic options. None or minimally invasive therapies such as Photodynamic Therapy (PDT) or photothermal therapies could become part of the overall treatment options in these countries. However, widespread acceptance is hindered by the current empirical training of surgeons in these optical techniques and a lack of easily usable treatment optimizing tools. Methods: Based on image processing programs, ITK-SNAP, and the publicly available FullMonte light propagation software, a work plan is proposed that allows for personalized PDT treatment planning. Starting with, contoured clinical CT or MRI images, the generation of 3D tetrahedral models in silico, execution of the Monte Carlo simulation and presentation of the 3D fluence rate, Φ, [mWcm-2] distribution a treatment plan optimizing photon source placement is developed. Results: Permitting 1-2 days for the installation of the required programs, novices can generate their first fluence, H [Jcm-2] or Φ distribution in a matter of hours. This is reduced to 10th of minutes with some training. Executing the photon simulation calculations is rapid and not the performance limiting process. Largest sources of errors are uncertainties in the contouring and unknown tissue optical properties. Conclusions: The presented FullMonte simulation is the fastest tetrahedral based photon propagation program and provides the basis for PDT treatment planning processes, enabling a faster proliferation of low cost, minimal invasive personalized cancer therapies.

  18. Fiscal Year 2011 Afghanistan Infrastructure Fund Projects Are Behind Schedule and Lack Adequate Sustainment Plans

    DTIC Science & Technology

    2012-07-30

    interconnected subset ofUSATD Economic Support Fund ( ESl -") projects, which arc essential to meet program ol~jcctives. Under the program, DOS and US AID...with conunent: The congressional reporting requirements in the KDAA cover AIF funded projects, whether executed hy DoD or DOS. ESl ’-tunded projects

  19. A Nursing Leadership Immersion Program: Succession Planning Using Social Capital.

    PubMed

    Pedersen, Anne; Sorensen, Joanne; Babcock, Tyler; Bradley, Marci; Donaldson, Nicole; Donnelly, James E; Edgar, William

    2018-03-01

    This article describes the inception and evolution of a 3-month immersion experience between hospital and nurse leaders where sociological principles were applied to support nurse leader succession. Unique to this program, the bedside nurse joins the nursing executive team full time to participate in all organizational leadership activities as part of the experience.

  20. Educational Policy and Literacy Learning in an ESL Classroom: Constraints and Opportunities

    ERIC Educational Resources Information Center

    Ricklefs, Mariana Alvayero

    2012-01-01

    This dissertation was a qualitative case study of an educational program for English Language Learners (ELL) at an elementary school in a small city in the Midwest. This case study investigated how language ideologies influence the constraints and opportunities for the planning and execution of this educational program. The findings evidenced that…

  1. Exercises in Evaluation of a Large-Scale Educational Program.

    ERIC Educational Resources Information Center

    Glass, Gene V.

    This workbook is designed to serve as training experience for educational evaluators at the preservice (graduate school) or inservice stages. The book comprises a series of exercises in the planning, execution, and reporting of the evaluation of a large-scale educational program in this case Title I of the Elementary and Secondary Education Act of…

  2. Supporting Museums--Serving Communities: An Evaluation of the Museums for America Program. Executive Summary

    ERIC Educational Resources Information Center

    Institute of Museum and Library Services, 2011

    2011-01-01

    Museums for America (MFA) is the largest IMLS grant program for museums; it supports institutions by investing in high-priority, high-value activities that are clearly linked to the institution's strategic plan and enhance its value to its community. MFA grants situate projects within a framework of meeting three strategic goals: engaging…

  3. System architecture for asynchronous multi-processor robotic control system

    NASA Technical Reports Server (NTRS)

    Steele, Robert D.; Long, Mark; Backes, Paul

    1993-01-01

    The architecture for the Modular Telerobot Task Execution System (MOTES) as implemented in the Supervisory Telerobotics (STELER) Laboratory is described. MOTES is the software component of the remote site of a local-remote telerobotic system which is being developed for NASA for space applications, in particular Space Station Freedom applications. The system is being developed to provide control and supervised autonomous control to support both space based operation and ground-remote control with time delay. The local-remote architecture places task planning responsibilities at the local site and task execution responsibilities at the remote site. This separation allows the remote site to be designed to optimize task execution capability within a limited computational environment such as is expected in flight systems. The local site task planning system could be placed on the ground where few computational limitations are expected. MOTES is written in the Ada programming language for a multiprocessor environment.

  4. Planned Closeout of the Cf-252 Loan/Lease Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sherman, Steven R; Patton, Bradley D

    2012-09-01

    New funding is sought to pursue planned closeout of the Cf-252 Loan Program. The work will be performed in phases. In the initial phase, users will be surveyed to determine whether they wish to take ownership of sources in their possession, or return them. In the second phase, sources will be recalled from non-DOE entities, and source ownership transfers will be performed. In the third phase, the remaining sources from DOE entities will be recalled. Initial funding of $350K is sought to fund the first phase, and to plan execution of the remaining phases given information collected from user surveys.

  5. 5 CFR 370.102 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... PROGRAM § 370.102 Definitions. In this part: Agency means an Executive agency as defined in 5 U.S.C. 105... planning, organizing, staffing, directing, integrating, or controlling of information technology as defined... acquisition, storage, manipulation, management, movement, control, display, switching, interchange...

  6. 5 CFR 370.102 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... PROGRAM § 370.102 Definitions. In this part: Agency means an Executive agency as defined in 5 U.S.C. 105... planning, organizing, staffing, directing, integrating, or controlling of information technology as defined... acquisition, storage, manipulation, management, movement, control, display, switching, interchange...

  7. 5 CFR 370.102 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... PROGRAM § 370.102 Definitions. In this part: Agency means an Executive agency as defined in 5 U.S.C. 105... planning, organizing, staffing, directing, integrating, or controlling of information technology as defined... acquisition, storage, manipulation, management, movement, control, display, switching, interchange...

  8. Summary of PhysPAG Activity

    NASA Astrophysics Data System (ADS)

    Nousek, John A.

    2014-01-01

    The Physics of the Cosmos Program Analysis Group (PhysPAG) is responsible for solicitiing and coordinating community input for the development and execution of NASA's Physics of the Cosmos (PCOS) program. In this session I will report on the activity of the PhysPAG, and solicit community involvement in the process of defining PCOS objectives, planning SMD architecture, and prioritizing PCOS activities. I will also report on the activities of the PhysPAG Executive Committee, which include the chairs of the Science Analysis Groups/ Science Interest Groups which fall under the PhysPAG sphere of interest. Time at the end of the presentation willl be reserved for questions and discussion from the community.

  9. The space shuttle payload planning working groups: Executive summaries

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The findings of a space shuttle payload planning group session are presented. The purpose of the workshop is: (1) to provide guidance for the design and development of the space shuttle and the spacelab and (2) to plan a space science and applications program for the 1980 time period. Individual groups were organized to cover the various space sciences, applications, technologies, and life sciences. Summaries of the reports submitted by the working groups are provided.

  10. Navy Energy/Water Program and Applicable Process Technologies

    DTIC Science & Technology

    2004-02-25

    wise man never plays leapfrog with a unicorn . •Research causes cancer in rats. •Always remember to pillage BEFORE you burn. •It may be that your sole...10% of Ksf Annually •Develops and Executes ECIP •Develops and Executes Alternative Financed - Marketing; Technical, Financial & Design Reviews...boilers, EMCS, street lighting 12 Goals • Award $200M/yr in energy projects – Central Funding – Alternative Financing – Others 13 FY04 Plans •Management

  11. Some guidance on preparing validation plans for the DART Full System Models.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gray, Genetha Anne; Hough, Patricia Diane; Hills, Richard Guy

    2009-03-01

    Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generallymore » applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan will vary according to application requirements and available resources.« less

  12. Prevalence of executive dysfunction in cocaine, heroin and alcohol users enrolled in therapeutic communities.

    PubMed

    Fernández-Serrano, María José; Pérez-García, Miguel; Perales, José C; Verdejo-García, Antonio

    2010-01-10

    Many studies have observed relevant executive alterations in polysubstance users but no data have been generated in terms of prevalence of these alterations. Studies of the prevalence of neuropsychological impairment can be useful in the design and implementations of interventional programs for substance abusers. The present study was conducted to estimate the prevalence of neuropsychological impairment in different components of executive functions in polysubstance users enrolled in therapeutic communities. Moreover, we estimated the effect size of the differences in the executive performance between polysubstance users and non substance users in order to know which neuropsychological tasks can be useful to detect alterations in the executive functions. Study results showed a high prevalence of executive function impairment in polysubstance users. Working memory was the component with the highest impairment proportion, followed by fluency, shifting, planning, multi-tasking and interference. Comparisons between user groups showed very similar executive impairment prevalence for all the analyzed executive components. The best discriminating task between users and controls was Arithmetic (Wechsler Adult Intelligence Scale, WAIS-III). Moreover FAS and Ruff Figural Fluency Test was discriminating for fluency, Category Test for shifting, Stroop Colour-Word Interference Test for interference, Zoo Map (Behavioural Assessment of the Dysexecutive Syndrome, BADS) for planning and Six Elements (BADS) for multi-tasking. The existence of significant prevalence of executive impairment in polysubstance users reveals the need to redirect the actuation policies in the field of drug-dependency towards the creation of treatments addressed at the executive deficits of the participants, which in turn would facilitate the individuals' compliance and final rehabilitation.

  13. Intelligent Rover Execution for Detecting Life in the Atacama Desert

    NASA Technical Reports Server (NTRS)

    Baskaran, Vijayakumar; Muscettola, Nicola; Rijsman, David; Plaunt, Chris; Fry, Chuck

    2006-01-01

    On-board supervisory execution is crucial for the deployment of more capable and autonomous remote explorers. Planetary science is considering robotic explorers operating for long periods of time without ground supervision while interacting with a changing and often hostile environment. Effective and robust operations require on-board supervisory control with a high level of awareness of the principles of functioning of the environment and of the numerous internal subsystems that need to be coordinated. We describe an on-board rover executive that was deployed on a rover as past of the "Limits of Life in the Atacama Desert (LITA)" field campaign sponsored by the NASA ASTEP program. The executive was built using the Intelligent Distributed Execution Architecture (IDEA), an execution framework that uses model-based and plan-based supervisory control of its fundamental computational paradigm. We present the results of the third field experiment conducted in the Atacama desert (Chile) in August - October 2005.

  14. International Space Station Execution Replanning Process: Trends and Implications

    NASA Technical Reports Server (NTRS)

    McCormick, Robet J.

    2007-01-01

    International Space Station is a joint venture. Because of this, ISS execution planning- planning within the week for the ISS requires coordination across multiple partner, and the associated processes and tools to allow this coordination to occur. These processes and tools are currently defined and are extensively used. This paper summarizes these processes, and documents the current data trends associated with these processes and tools, with a focus on the metrics provided from the ISS Planning Product Change Request (PPCR) tool. As NASA's Vision for Space Exploration and general Human spaceflight trends are implemented, the probability of joint venture long duration programs such as ISS, with varying levels of intergovernmental and/or corporate partnership, will increase. Therefore, the results of this PPCR analysis serve as current Lessons learned for the ISS and for further similar ventures.

  15. Autonomous Mission Manager for Rendezvous, Inspection and Mating

    NASA Technical Reports Server (NTRS)

    Zimpfer, Douglas J.

    2003-01-01

    To meet cost and safety objectives, space missions that involve proximity operations between two vehicles require a high level of autonomy to successfully complete their missions. The need for autonomy is primarily driven by the need to conduct complex operations outside of communication windows, and the communication time delays inherent in space missions. Autonomy also supports the goals of both NASA and the DOD to make space operations more routine, and lower operational costs by reducing the requirement for ground personnel. NASA and the DoD have several programs underway that require a much higher level of autonomy for space vehicles. NASA's Space Launch Initiative (SLI) program has ambitious goals of reducing costs by a factor or 10 and improving safety by a factor of 100. DARPA has recently begun its Orbital Express to demonstrate key technologies to make satellite servicing routine. The Air Force's XSS-ll program is developing a protoflight demonstration of an autonomous satellite inspector. A common element in space operations for many NASA and DOD missions is the ability to rendezvous, inspect anclJor dock with another spacecraft. For DARPA, this is required to service or refuel military satellites. For the Air Force, this is required to inspect un-cooperative resident space objects. For NASA, this is needed to meet the primary SLI design reference mission of International Space Station re-supply. A common aspect for each of these programs is an Autonomous Mission Manager that provides highly autonomous planning, execution and monitoring of the rendezvous, inspection and docking operations. This paper provides an overview of the Autonomous Mission Manager (AMM) design being incorporated into many of these technology programs. This AMM provides a highly scalable level of autonomous operations, ranging from automatic execution of ground-derived plans to highly autonomous onboard planning to meet ground developed mission goals. The AMM provides the capability to automatically execute the plans and monitor the system performance. In the event of system dispersions or failures the AMM can modify plans or abort to assure overall system safety. This paper describes the design and functionality of Draper's AMM framework, presents concept of operations associated with the use of the AMM, and outlines the relevant features of the flight demonstrations.

  16. Integrated environmental planning in the Philippines: A case study of the Palawan Integrated Environmental Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ganapin, D.J. Jr.

    1987-01-01

    Integrated environmental planning was analyzed using the case of the Palawan Integrated Environmental Program in the Philippines. The study explores the relationship between development and environmental planning and evaluates the importance of organizational coordination and timing in the integration of these two concerns. Factors affecting the accomplishment of the objectives of integrated environmental planning were also studied. Two planning phases of the Palawan Integrated Environmental Program were observed using the case study approach. Observations of various planning participants-consultants, middle level agency personnel, heads of local agencies-were also considered. The integration of environmental considerations in development planning was found to bemore » beneficial to both environmental and development concerns. The experience showed that such integration requiring tight organizational coordination and the proper timing of activities and outputs. The success of the Palawan Integrated Environmental Program was also found to depend on effective communication, the political functionality of the government, the leadership of its executives, the presence of appropriate structures of authority, sufficiency of funds and manpower and the availability of appropriate environmental planning techniques. Recommendations are provided to further strengthen the integration of environmental considerations in development planning and increase the effectiveness of integrated environmental programs.« less

  17. 78 FR 28243 - Senior Executive Service; Performance Review Board; Members

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-14

    ... NATIONAL CAPITAL PLANNING COMMISSION Senior Executive Service; Performance Review Board; Members AGENCY: National Capital Planning Commission. ACTION: Notice of Members of Senior Executive Service... Senior Executive Service. The PRB established for the National Capital Planning Commission also makes...

  18. 76 FR 29013 - Senior Executive Service; Performance Review Board; Members

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-19

    ... NATIONAL CAPITAL PLANNING COMMISSION Senior Executive Service; Performance Review Board; Members AGENCY: National Capital Planning Commission. ACTION: Notice of Members of Senior Executive Service... Senior Executive Service. The PRB established for the National Capital Planning Commission also makes...

  19. WORKSHOP ON ORGANIZATION AND OPERATION OF COOPERATIVE WORK EXPERIENCE PROGRAMS IN TRADE AND INDUSTRIAL EDUCATION. (TUSKEGEE INSTITUTE, AUGUST 14-SEPTEMBER 1, 1967). FINAL REPORT.

    ERIC Educational Resources Information Center

    HARRIS, JAMES N.; SHERARD, AUSTELL O.

    THIRTY-NINE TRADE AND INDUSTRIAL AND VOCATIONAL TECHNICAL TEACHERS AND SUPERVISORS FROM 19 STATES PARTICIPATED IN A WORKSHOP TO PLAN AND EXECUTE A COMPREHENSIVE EXAMINATION AND EVALUATION OF THE COOPERATIVE WORK EXPERIENCE PLAN OF EDUCATION RELATIVE TO TRADE AND INDUSTRIAL EDUCATION. THE WORKSHOP ORGANIZATION INCLUDED CONSULTANT PRESENTATIONS,…

  20. Operational Focused Simulation

    DTIC Science & Technology

    2009-12-01

    selected technologies. In order to build the scenario to fit the vignette, the Theater Battle Management Core System ( TBMCS ) databases were adjusted... TBMCS program provided an automated and integrated capability to plan and execute the air battle plan for the modeling and simulation efforts. TBMCS ...is the operational system of record for the Air and Space Operations Center Weapons System (AOC WS). TBMCS provides the Joint/Combined Forces Air

  1. AU-18 Space Primer

    DTIC Science & Technology

    2009-09-01

    force air and space component commander (CFACC) should be des - ignated as the supported commander for counterspace operations. • To plan , execute, and...performing COMINT and/or FISINT activities. Figure 13-10. Poppy satellite with multiface de - sign. (Photo taken by the NRL and provided cour- tesy of the...SATCOM) Planning Information Network SPO special projects office; system programs office SPOT Satellite Pour L’Observation de la Terre SPS

  2. Longitudinal Analysis of Music Education on Executive Functions in Primary School Children

    PubMed Central

    Jaschke, Artur C.; Honing, Henkjan; Scherder, Erik J. A.

    2018-01-01

    Background: Research on the effects of music education on cognitive abilities has generated increasing interest across the scientific community. Nonetheless, longitudinal studies investigating the effects of structured music education on cognitive sub-functions are still rare. Prime candidates for investigating a relationship between academic achievement and music education appear to be executive functions such as planning, working memory, and inhibition. Methods: One hundred and forty-seven primary school children, Mage = 6.4 years, SD = 0.65 were followed for 2.5 years. Participants were randomized into four groups: two music intervention groups, one active visual arts group, and a no arts control group. Neuropsychological tests assessed verbal intelligence and executive functions. Additionally, a national pupil monitor provided data on academic performance. Results: Children in the visual arts group perform better on visuospatial memory tasks as compared to the three other conditions. However, the test scores on inhibition, planning and verbal intelligence increased significantly in the two music groups over time as compared to the visual art and no arts controls. Mediation analysis with executive functions and verbal IQ as mediator for academic performance have shown a possible far transfer effect from executive sub-function to academic performance scores. Discussion: The present results indicate a positive influence of long-term music education on cognitive abilities such as inhibition and planning. Of note, following a two-and-a-half year long visual arts program significantly improves scores on a visuospatial memory task. All results combined, this study supports a far transfer effect from music education to academic achievement mediated by executive sub-functions. PMID:29541017

  3. Longitudinal Analysis of Music Education on Executive Functions in Primary School Children.

    PubMed

    Jaschke, Artur C; Honing, Henkjan; Scherder, Erik J A

    2018-01-01

    Background: Research on the effects of music education on cognitive abilities has generated increasing interest across the scientific community. Nonetheless, longitudinal studies investigating the effects of structured music education on cognitive sub-functions are still rare. Prime candidates for investigating a relationship between academic achievement and music education appear to be executive functions such as planning, working memory, and inhibition. Methods: One hundred and forty-seven primary school children, M age = 6.4 years, SD = 0.65 were followed for 2.5 years. Participants were randomized into four groups: two music intervention groups, one active visual arts group, and a no arts control group. Neuropsychological tests assessed verbal intelligence and executive functions. Additionally, a national pupil monitor provided data on academic performance. Results: Children in the visual arts group perform better on visuospatial memory tasks as compared to the three other conditions. However, the test scores on inhibition, planning and verbal intelligence increased significantly in the two music groups over time as compared to the visual art and no arts controls. Mediation analysis with executive functions and verbal IQ as mediator for academic performance have shown a possible far transfer effect from executive sub-function to academic performance scores. Discussion: The present results indicate a positive influence of long-term music education on cognitive abilities such as inhibition and planning. Of note, following a two-and-a-half year long visual arts program significantly improves scores on a visuospatial memory task. All results combined, this study supports a far transfer effect from music education to academic achievement mediated by executive sub-functions.

  4. Definition of Life Sciences laboratories for shuttle/Spacelab. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Research requirements and the laboratories needed to support a Life Sciences research program during the shuttle/Spacelab era were investigated. A common operational research equipment inventory was developed to support a comprehensive but flexible Life Sciences program. Candidate laboratories and operational schedules were defined and evaluated in terms of accomodation with the Spacelab and overall program planning. Results provide a firm foundation for the initiation of a life science program for the shuttle era.

  5. Automated planning for intelligent machines in energy-related applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weisbin, C.R.; de Saussure, G.; Barhen, J.

    1984-01-01

    This paper discusses the current activities of the Center for Engineering Systems Advanced Research (CESAR) program related to plan generation and execution by an intelligent machine. The system architecture for the CESAR mobile robot (named HERMIES-1) is described. The minimal cut-set approach is developed to reduce the tree search time of conventional backward chaining planning techniques. Finally, a real-time concept of an Intelligent Machine Operating System is presented in which planning and reasoning is embedded in a system for resource allocation and process management.

  6. Current and future directions in Medi-Cal chronic disease care management: a view from the top.

    PubMed

    Goldman, L Elizabeth; Handley, Margaret; Rundall, Thomas G; Schillinger, Dean

    2007-05-01

    To determine the extent to which Medicaid managed care (MMC) organizations are engaged in chronic disease care management (CDCM), tailor CDCM for diverse populations, or plan to expand CDCM. Web-based survey of 23 eligible California MMC health plan executives in fall 2005. Frequency distributions of survey responses. Nineteen (83%) of 23 executives responded, representing 2.5 million beneficiaries. Eighteen (95%) MMC plans reported implementing 1 or more elements of CDCM. Although plans used a wide range of CDCM strategies to reach performance goals, most implemented provider awareness activities such as offering guidelines or disease-specific feedback to physician groups. More than half of the plans reported interest in expanding CDCM to include more active interventions such as disease registries, pay for performance, telephone counseling to patients, and other self-management support programs. Few plans reported tailoring their CDCM to vulnerable member populations such as those with limited literacy or limited English proficiency. Executives reported that insufficient financial resources at the plan level, lack of organizational leadership and commitment in physician organizations, and limited information technology in physician offices were barriers to CDCM expansion. California MMC health plans reported substantial interest in CDCM and a desire to increase CDCM. Representatives reported intentions to expand to strategies that more directly engage providers and patients. To ensure that the growing number of vulnerable enrollees with chronic disease receive high-quality care, policy efforts should focus on enabling MMC health plans to more consistently implement and target population-based strategies such as CDCM.

  7. 1976 Inter-university symposium on renewable resource assessment and programming: executive summary

    Treesearch

    Billy G. Pemberton

    1977-01-01

    The Forest and Rangeland Renewable Resources Planning Act of 1974 directs the Secretary of Agriculture to prepare an assessment of the nation's renewable resources and a program that will assure an adequate future supply of these resources. Responsibility for this work is assigned to the Forest Service. An inter-university symposium was held in 1976 to evaluate...

  8. Modular space station phase B extension period executive summary

    NASA Technical Reports Server (NTRS)

    Tischler, A. A.; Could, C. L.

    1972-01-01

    A narrative summary is presented of technical, programmatic, and planning information developed during the space station definition study extension period. The modular space station is emphasized, but tasks pertaining to shuttle sorties missions and information management advanced development are included. A series of program options considering technical, schedule, and programmatic alternatives to the baseline program are defined and evaluated.

  9. Governor's Educator Excellence Grant (GEEG) Program: Year Three Evaluation Report. Policy Evaluation Report. [Executive Summary

    ERIC Educational Resources Information Center

    Springer, Matthew G.; Lewis, Jessica L.; Podgursky, Michael J.; Ehlert, Mark W.; Taylor, Lori L.; Lopez, Omar S.; Peng, Art

    2009-01-01

    The Governor's Educator Excellence Grant (GEEG) program was federally- and state-funded and provided three-year grants to schools to design and implement performance pay plans from the 2005-06 to 2007-08 school years. GEEG was implemented in 99 high poverty, high performing Texas public schools. Performance pay for teachers entered Texas state…

  10. The Relationship between Superintendents' Perceptions about Gifted Education and the Content of Local Academically or Intellectually Gifted Education Plans

    ERIC Educational Resources Information Center

    Clark, Kaye B.

    2016-01-01

    A public school superintendent, as the chief executive officer in a district, is in a unique position to influence the programs addressing the needs of gifted students in that district. A superintendent's beliefs could impact program content, resource allocation, and priority status. This study looked at superintendents' perceptions of the North…

  11. Texas Educator Excellence Grant (TEEG) Program: Year Three Evaluation Report. Policy Evaluation Report. [Executive Summary

    ERIC Educational Resources Information Center

    Springer, Matthew G.; Lewis, Jessica L.; Podgursky, Michael J.; Ehlert, Mark W.; Gronberg, Timothy J.; Hamilton, Laura S.; Jansen, Dennis W.; Stecher, Brian M.; Taylor, Lori L.; Lopez, Omar S.; Peng, Art

    2009-01-01

    The Texas Educator Excellence Grant (TEEG) program was state-funded and provided annual grants to schools to design and implement performance pay plans during the 2006-07 to 2009-10 school year. TEEG was implemented each year (i.e., Cycle) in approximately 1,000 high poverty, high performing Texas public schools. Performance pay for teachers…

  12. Execution of Educational Mechanical Production Programs for School Children

    NASA Astrophysics Data System (ADS)

    Itoh, Nobuhide; Itoh, Goroh; Shibata, Takayuki

    The authors are conducting experience-based engineering educational programs for elementary and junior high school students with the aim to provide a chance for them to experience mechanical production. As part of this endeavor, we planned and conducted a program called “Fabrication of Original Magnet Plates by Casting” for elementary school students. This program included a course for leading nature laws and logical thinking method. Prior to the program, a preliminary program was applied to school teachers to get comments and to modify for the program accordingly. The children responded excellently to the production process which realizes their ideas, but it was found that the course on natural laws and logical methods need to be improved to draw their interest and attention. We will continue to plan more effective programs, deepening ties with the local community.

  13. Space station needs, attributes and architectural options study. Volume 1: Executive study

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Mission identification and validation, the benefits of a manned presence in space; attributes and architectures; time-phased mission and system requirements imposed on the space station; orbit selection; space station architectural options; technology selection; and program planning are addressed.

  14. Benchmarking study of USDA Forest Service fisheries and aquatic ecology programs : executive summary.

    DOT National Transportation Integrated Search

    2001-03-15

    Increased emphasis on ecosystem management and accountability by the United States : Department of Agriculture (USDA) Forest Service and other federal land management : agencies has led to the development of a series of strategic plans such as the Cl...

  15. 48 CFR 2509.407-3 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Procedures. 2509.407-3 Section 2509.407-3 Federal Acquisition Regulations System NATIONAL SCIENCE FOUNDATION ACQUISITION PLANNING... Counsel, the NSF Procurement Executive, and program officials, what additional steps are necessary and...

  16. 48 CFR 2509.406-3 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Procedures. 2509.406-3 Section 2509.406-3 Federal Acquisition Regulations System NATIONAL SCIENCE FOUNDATION ACQUISITION PLANNING... Counsel, the NSF Procurement Executive, and program officials, what additional steps are necessary and...

  17. Lean and Efficient Software: Whole-Program Optimization of Executables

    DTIC Science & Technology

    2013-01-03

    staffing for the project  Implementing the necessary infrastructure ( testing, performance evaluation, needed support software, bug and issue...in the SOW The result of the planning discussions is shown in the milestone table (section 6). In addition, we selected appropriate engineering

  18. Teaching case studies on earthquake preparedness efforts in the transportation sector, Los Angeles metropolitan area.

    DOT National Transportation Integrated Search

    2013-01-01

    Through the development of a Harvard Kennedy School case study (intended for : use as curriculum in graduate-level and executive education programs), this project : examines earthquake preparedness and planning processes in the Los Angeles : metropol...

  19. 48 CFR 2509.406-3 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Procedures. 2509.406-3 Section 2509.406-3 Federal Acquisition Regulations System NATIONAL SCIENCE FOUNDATION ACQUISITION PLANNING... Counsel, the NSF Procurement Executive, and program officials, what additional steps are necessary and...

  20. 48 CFR 2509.406-3 - Procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Procedures. 2509.406-3 Section 2509.406-3 Federal Acquisition Regulations System NATIONAL SCIENCE FOUNDATION ACQUISITION PLANNING... Counsel, the NSF Procurement Executive, and program officials, what additional steps are necessary and...

  1. 48 CFR 2509.407-3 - Procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Procedures. 2509.407-3 Section 2509.407-3 Federal Acquisition Regulations System NATIONAL SCIENCE FOUNDATION ACQUISITION PLANNING... Counsel, the NSF Procurement Executive, and program officials, what additional steps are necessary and...

  2. 48 CFR 2509.406-3 - Procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Procedures. 2509.406-3 Section 2509.406-3 Federal Acquisition Regulations System NATIONAL SCIENCE FOUNDATION ACQUISITION PLANNING... Counsel, the NSF Procurement Executive, and program officials, what additional steps are necessary and...

  3. 48 CFR 2509.407-3 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Procedures. 2509.407-3 Section 2509.407-3 Federal Acquisition Regulations System NATIONAL SCIENCE FOUNDATION ACQUISITION PLANNING... Counsel, the NSF Procurement Executive, and program officials, what additional steps are necessary and...

  4. 48 CFR 2509.407-3 - Procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Procedures. 2509.407-3 Section 2509.407-3 Federal Acquisition Regulations System NATIONAL SCIENCE FOUNDATION ACQUISITION PLANNING... Counsel, the NSF Procurement Executive, and program officials, what additional steps are necessary and...

  5. 48 CFR 2509.406-3 - Procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Procedures. 2509.406-3 Section 2509.406-3 Federal Acquisition Regulations System NATIONAL SCIENCE FOUNDATION ACQUISITION PLANNING... Counsel, the NSF Procurement Executive, and program officials, what additional steps are necessary and...

  6. 48 CFR 2509.407-3 - Procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Procedures. 2509.407-3 Section 2509.407-3 Federal Acquisition Regulations System NATIONAL SCIENCE FOUNDATION ACQUISITION PLANNING... Counsel, the NSF Procurement Executive, and program officials, what additional steps are necessary and...

  7. Human Resource Managers Rank Their Pressure Points.

    ERIC Educational Resources Information Center

    Herring, Jack

    1983-01-01

    A survey of 700 top-level human resource executives that elicited 309 responses revealed the highest priority ranking of 24 human resource issues to be: productivity improvement, controlling costs of employee benefits, compensation planning and administration, employee communications, upgrading management training development programs,…

  8. Creating the Action Model for High Risk Infant Follow Up Program in Iran.

    PubMed

    Heidarzadeh, Mohammad; Jodiery, Behzad; Mirnia, Kayvan; Akrami, Forouzan; Hosseini, Mohammad Bagher; Heidarabadi, Seifollah; HabibeLahi, Abbas

    2013-11-01

    Intervention in early childhood development as one of the social determinants of health, is important for reducing social gap and inequity. In spite of increasingly developing intensive neonatal care wards and decreasing neonatal mortality rate, there is no follow up program in Iran. This study was carreid out to design high risk infants follow up care program with the practical aim of creating an model action for whole country, in 2012. This qualitative study has been done by the Neonatal Department of the Deputy of Public Health in cooperation with Pediatrics Health Research Center of Tabriz University of Medical Sciences, Iran. After study of international documents, consensus agreement about adapted program for Iran has been accomplished by focus group discussion and attended Delphi agreement technique. After compiling primary draft included evidence based guidelines and executive plan, 14 sessions including expert panels were hold to finalize the program. After finalizing the program, high risk infants follow up care service package has been designed in 3 chapters: Evidence based clinical guidelines; eighteen main clinical guidelines and thirteen subsidiaries clinical guidelines, executive plan; 6 general, 6 following up and 5 backup processes. Education program including general and especial courses for care givers and follow up team, and family education processes. We designed and finalized high risk infants follow up care service package. It seems to open a way to extend it to whole country.

  9. Effectiveness of a Standardized Equine-Assisted Therapy Program for Children with Autism Spectrum Disorder.

    PubMed

    Borgi, Marta; Loliva, Dafne; Cerino, Stefania; Chiarotti, Flavia; Venerosi, Aldina; Bramini, Maria; Nonnis, Enrico; Marcelli, Marco; Vinti, Claudia; De Santis, Chiara; Bisacco, Francesca; Fagerlie, Monica; Frascarelli, Massimo; Cirulli, Francesca

    2016-01-01

    In this study the effectiveness of an equine-assisted therapy (EAT) in improving adaptive and executive functioning in children with autism spectrum disorder (ASD) was examined (children attending EAT, n = 15, control group n = 13; inclusion criteria: IQ > 70). Therapeutic sessions consisted in structured activities involving horses and included both work on the ground and riding. Results indicate an improvement in social functioning in the group attending EAT (compared to the control group) and a milder effect on motor abilities. Improved executive functioning was also observed (i.e. reduced planning time in a problem-solving task) at the end of the EAT program. Our findings provide further support for the use of animal-assisted intervention programs as complementary intervention strategies for children with ASD.

  10. The Joint Military Medical Executive Skills initiative: an impressive response to changing human resource management rules of engagement.

    PubMed

    Kerr, Bernard J

    2007-01-01

    Confronted with a sudden and substantial change in the rules regarding who could command a military medical treatment facility (MTF), the Military Health System (MHS) responded to the challenge with an impressive human resource management solution-the Joint Medical Executive Skills Program. The history, emergence, and continuing role of this initiative exemplifies the MHS's capacity to fulfill the spirit and intent of an arduous Congressional mandate while enhancing professional development and sustaining the career opportunities of medical officers. The MHS response to the Congressional requirement that candidates for MTF command demonstrate professional administrative skills was decisive, creative, and consistent with the basic principles of human resource management. The Joint Medical Executive Skills Program is a management success story that demonstrates how strategic planning, well-defined skills requirements, and structured training can assure a ready supply of qualified commanders for the military's MTFs.

  11. Corps Helicopter Attack Planning System (CHAPS). Positional Handbook. Appendix A. Messages. Appendix B. Statespace Construction Sample Session

    DTIC Science & Technology

    1989-10-01

    REVIEW MENU PROGRAM (S) CHAPS PURPOSE AND OVERVIEV The Do Review menu allows the user to select which missions to perform detailed analysis on and...input files must be resident on the computer you are running SUPR on. Any interface or file transfer programs must be successfully executed prior to... COMPUTER PROGRAM WAS DEVELOPED BY SYSTEMS CONTROL TECHNOLOGY FOR THE DEPUTY CHIEF OF STAFF/OPERATIONS,HQ USAFE. THE USE OF THE COMPUTER PROGRAM IS

  12. Planning and Execution of a Marine Methane Hydrate Pressure Coring Program for the Walker Ridge and Green Canyon Areas of the Gulf of Mexico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Humphrey, Gary

    The objective of this project (and report) is to produce a guide to developing scientific, operational, and logistical plans for a future methane hydrate-focused offshore pressure coring program. This report focuses primarily on a potential coring program in the Walker Ridge 313 and Green Canyon 955 blocks where previous investigations were undertaken as part of the 2009 Department of Energy JIP Leg II expedition, however, the approach to designing a pressure coring program that was utilized for this project may also serve as a useful model for planning pressure coring programs for hydrates in other areas. The initial portion ofmore » the report provides a brief overview of prior investigations related to gas hydrates in general and at the Walker Ridge 313 and Green Canyon 955 blocks in particular. The main content of the report provides guidance for various criteria that will come into play when designing a pressure coring program.« less

  13. 41 CFR 105-53.139 - Office of the Comptroller.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... programs; planning, developing, and directing GSA's executive management information system; and overseeing... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Office of the Comptroller. 105-53.139 Section 105-53.139 Public Contracts and Property Management Federal Property...

  14. 75 FR 71135 - Notice of Meeting; Advisory Council on Historic Preservation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... Welcome II. Chairman's Report III. Executive Director's Report IV. Native American Activities A. Native American Program Report 1. HUD Delegation of Tribal Consultation Responsibilities 2. DOI-DoD-ACHP.... Strategic Planning: Next Steps VI. Sustainability and Historic Preservation Task Force VII. Preservation...

  15. Low hanging fruit in infectious disease drug development.

    PubMed

    Kraus, Carl N

    2008-10-01

    Cost estimates for developing new molecular entities (NME) are reaching non-sustainable levels and coupled with increasing regulatory requirements and oversight have led many pharmaceutical sponsors to divest their anti-microbial development portfolios [Projan SJ: Why is big Pharma getting out of anti-bacterial drug discovery?Curr Opin Microbiol 2003, 6:427-430] [Spellberg B, Powers JH, Brass EP, Miller LG, Edwards JE, Jr: Trends in antimicrobial drug development: implications for the future.Clin Infect Dis 2004, 38:1279-1286]. Operational issues such as study planning and execution are significant contributors to the overall cost of drug development that can benefit from the leveraging of pre-randomization data in an evidence-based approach to protocol development, site selection and patient recruitment. For non-NME products there is even greater benefit from available data resources since these data may permit smaller and shorter study programs. There are now many available open source intelligence (OSINT) resources that are being integrated into drug development programs, permitting an evidence-based or 'operational epidemiology' approach to study planning and execution.

  16. The CPAT 2.0.2 Domain Model - How CPAT 2.0.2 "Thinks" From an Analyst Perspective.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Waddell, Lucas; Muldoon, Frank; Melander, Darryl J.

    To help effectively plan the management and modernization of their large and diverse fleets of vehicles, the Program Executive Office Ground Combat Systems (PEO GCS) and the Program Executive Office Combat Support and Combat Service Support (PEO CS &CSS) commissioned the development of a large - scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This reportmore » contains a description of the organizational fleet structure and a thorough explanation of the business rules that the CPAT formulation follows involving performance, scheduling, production, and budgets. This report, which is an update to the original CPAT domain model published in 2015 (SAND2015 - 4009), covers important new CPAT features. This page intentionally left blank« less

  17. Energy Engineering Analysis Program (EEAP), Badger Army Ammunition Plant, Baraboo, Wisconsin: Executive summary. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1983-12-30

    The purpose of this study and report is to develop a systematic program of energy consumption reductions in compliance with the stated goals of the Army Facilities Energy Plan (AFEP). This report will: Develop a systematic plan of energy conservation opportunities (ECO`s) that will meet the objectives of the AFEP. Develop a coordinated facility-wide energy study. Prepare DD Form 1391 and Project Development Brochure (PDB`s) and required documentation for feasible projects. Include all practical energy conservation methods and determine economic feasibility in accordance with given guidelines. List and prioritize recommended projects.

  18. Summary of the COS Cycle 22 Calibration Program

    NASA Astrophysics Data System (ADS)

    Sonnentrucker, Paule; Becker, George; Bostroem, Azalee; Debes, John H.; Ely, Justin; Fox, Andrew; Lockwood, Sean; Oliveira, Cristina; Penton, Steven; Proffitt, Charles; Roman-Duval, Julia; Sahnow, David; Sana, Hugues; Taylor, Jo; Welty, Alan D.; Wheeler, Thomas

    2016-09-01

    We summarize the calibration activities for the Cosmic Origins Spectrograph (COS) on the Hubble Space Telescope during Cycle 22 which ran from November 2014 through October 2015. We give an overview of the COS calibration plan, COS usage statistics and we briefly describe major changes with respect to the previous cycle. High-level executive summaries for each calibration program comprising Cycle 22 are also given here. Results of the analysis attached to each program are published in separate ISRs.

  19. Advanced Computer Aids in the Planning and Execution of Air Warfare and Ground Strike Operations: Conference Proceedings, Meeting of the Avionics Panels of AGARD (51st) Held in Kongsberg, Norway on 12-16 May 1986

    DTIC Science & Technology

    1986-02-01

    the area of Artificial Intelligence (At). DARPA’s Strategic Computing Program 13 developing an At ýtchnology base upon which several applications...technologies with the Strategic Computing Program . In late 1983 the Strategic Computing Program (SCP) wes announced. The program was organizsd to develop...solving a resource allocation problem. The remainder of this paper will discuss the TEMPLAR progeam as it relates to the Strategic Computing Program

  20. Integrating planning and reactive control

    NASA Technical Reports Server (NTRS)

    Rosenschein, Stanley J.; Kaelbling, Leslie Pack

    1989-01-01

    Artificial intelligence research on planning is concerned with designing control systems that choose actions by manipulating explicit descriptions of the world state, the goal to be achieved, and the effects of elementary operations available to the system. Because planning shifts much of the burden of reasoning to the machine, it holds great appeal as a high-level programming method. Experience shows, however, that it cannot be used indiscriminately because even moderately rich languages for describing goals, states, and the elementary operators lead to computational inefficiencies that render the approach unsuitable for realistic applications. This inadequacy has spawned a recent wave of research on reactive control or situated activity in which control systems are modeled as reacting directly to the current situation rather than as reasoning about the future effects of alternative action sequences. While this research has confronted the issue of run-time tractability head on, in many cases it has done so by sacrificing the advantages of declarative planning techniques. Ways in which the two approaches can be unified are discussed. The authors begin by modeling reactive control systems as state machines that map a stream of sensory inputs to a stream of control outputs. These machines can be decomposed into two continuously active subsystems: the planner and the execution module. The planner computes a plan, which can be seen as a set of bits that control the behavior of the execution module. An important element of this work is the formulation of a precise semantic interpretation for the inputs and outputs of the planning system. They show that the distinction between planned and reactive behavior is largely in the eye of the beholder: systems that seem to compute explicit plans can be redescribed in situation-action terms and vice versa. They also discuss practical programming techniques that allow the advantages of declarative programming and guaranteed reactive response to be achieved simultaneously.

  1. 1999 status of the nation's highways, bridges and transit : conditions and performance : report to Congress : executive summary

    DOT National Transportation Integrated Search

    2011-06-01

    This report presents the test plan for collecting and analyzing telecommuting/TDM data for the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA projects...

  2. Arkansas' Junior Executive Training Curriculum Guide.

    ERIC Educational Resources Information Center

    Clayton, Dean; And Others

    This curriculum guide is designed to help teachers conduct courses on small business management and entrepreneurship to high school seniors in Arkansas. The program focuses upon the managerial process, examining the functions of planning, organization, staffing, directing, and controlling as related to the activities and responsibilities of the…

  3. 32 CFR 623.2 - Loan policies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... 2542). (B) For ordnance and ordnance stores loaned to high schools in the District of Columbia (10 U.S...; DACD Plan; Garden Plot Group One: DOD Executive Agent or designee Group One: Arms, ammunition, tank... Bedding, cots, chairs, vehicles, buildings, etc. 11. Civilian Marksmanship Program (Clubs and Schools) 3...

  4. 32 CFR 623.2 - Loan policies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... 2542). (B) For ordnance and ordnance stores loaned to high schools in the District of Columbia (10 U.S...; DACD Plan; Garden Plot Group One: DOD Executive Agent or designee Group One: Arms, ammunition, tank... Bedding, cots, chairs, vehicles, buildings, etc. 11. Civilian Marksmanship Program (Clubs and Schools) 3...

  5. Banking, Technology Workers and Their Career Development.

    ERIC Educational Resources Information Center

    Armstrong, Lesley; West, Jim

    2001-01-01

    An Australian bank developed a four-stage career development strategy for information technology workers: (1) career coaching sessions with executives; (2) career coaching seminars for line managers and team leaders; (3) staff career planning workshops; and (4) online career development support. The program resulted in increased satisfaction,…

  6. 7 CFR 2610.1 - General statement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... duties of offices referred to in the Department as the “Office of Investigation” and the “Office of Audit..., supervise, and coordinate audits and investigations of USDA programs and operations to determine efficiency...) Advise the Secretary and General Officers in the planning, development, and execution of Department...

  7. An Assessment of the Armed Forces of the Philippines Modernization Program

    DTIC Science & Technology

    2007-12-14

    Sayaff Group BAC Bids and Awards Committee BCDA Bases Conversion and Development Authority BEP Bid Evaluation Plan BIR Bureau of Internal Revenue...contractor execute the requirements of the contract with regard to cost, schedule and performance (Sammet and Green 1990, 136) Bid Evaluation Plan or BEP is...adopted in the evaluation and assessment of bidders’ statements and the method and criteria for the evaluation and assessment of bids. The BEP also

  8. NASA sea ice and snow validation plan for the Defense Meteorological Satellite Program special sensor microwave/imager

    NASA Technical Reports Server (NTRS)

    Cavalieri, Donald J. (Editor); Swift, Calvin T. (Editor)

    1987-01-01

    This document addresses the task of developing and executing a plan for validating the algorithm used for initial processing of sea ice data from the Special Sensor Microwave/Imager (SSMI). The document outlines a plan for monitoring the performance of the SSMI, for validating the derived sea ice parameters, and for providing quality data products before distribution to the research community. Because of recent advances in the application of passive microwave remote sensing to snow cover on land, the validation of snow algorithms is also addressed.

  9. Scheduling algorithm for mission planning and logistics evaluation users' guide

    NASA Technical Reports Server (NTRS)

    Chang, H.; Williams, J. M.

    1976-01-01

    The scheduling algorithm for mission planning and logistics evaluation (SAMPLE) program is a mission planning tool composed of three subsystems; the mission payloads subsystem (MPLS), which generates a list of feasible combinations from a payload model for a given calendar year; GREEDY, which is a heuristic model used to find the best traffic model; and the operations simulation and resources scheduling subsystem (OSARS), which determines traffic model feasibility for available resources. The SAMPLE provides the user with options to allow the execution of MPLS, GREEDY, GREEDY-OSARS, or MPLS-GREEDY-OSARS.

  10. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  11. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  12. Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Millard, W. David; Johnson, Daniel M.; Henderson, John M.

    2014-07-28

    Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedbackmore » during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.« less

  13. Centralized Planning for Multiple Exploratory Robots

    NASA Technical Reports Server (NTRS)

    Estlin, Tara; Rabideau, Gregg; Chien, Steve; Barrett, Anthony

    2005-01-01

    A computer program automatically generates plans for a group of robotic vehicles (rovers) engaged in geological exploration of terrain. The program rapidly generates multiple command sequences that can be executed simultaneously by the rovers. Starting from a set of high-level goals, the program creates a sequence of commands for each rover while respecting hardware constraints and limitations on resources of each rover and of hardware (e.g., a radio communication terminal) shared by all the rovers. First, a separate model of each rover is loaded into a centralized planning subprogram. The centralized planning software uses the models of the rovers plus an iterative repair algorithm to resolve conflicts posed by demands for resources and by constraints associated with the all the rovers and the shared hardware. During repair, heuristics are used to make planning decisions that will result in solutions that will be better and will be found faster than would otherwise be possible. In particular, techniques from prior solutions of the multiple-traveling- salesmen problem are used as heuristics to generate plans in which the paths taken by the rovers to assigned scientific targets are shorter than they would otherwise be.

  14. Despacho No. 381, 27 June 1988.

    PubMed

    1988-01-01

    This Despacho sets forth the organization and functioning of administrative departments in Venezuela's Ministry of the Family. Among the Directorates of the Ministry are the General Sectoral Directorate for Attention to the Family, the General Sectoral Directorate for Attention to Children, the General Sectoral Directorate for Attention to Youth, the General Sectoral Directorate for the Promotion of Women, and the General Sectoral Directorate for Attention to the Elderly. The following are the duties of the General Sectoral Directorate for the Promotion of Women: 1) to agree and coordinate with public and private organizations on the planning and execution of programs designed to achieve the participation of women in the socioeconomic development of the country; 2) to promote and develop plans and programs relating to the occupation and employment of women and the defense and improvement of their standard of living; 3) to formulate and promote plans and programs directed at obtaining information and social, legal, and economic assistance for women, which will support the process of their incorporation into the socioeconomic, cultural, and political spheres of the country; 4) to develop orientation and education programs relating to the legal and social rights of women; 5) to carry out studies and research relating to the position and condition of women within the national context and to promote the participation of the public and private sectors in these studies and research; 6) to direct, coordinate, and supervise the execution of programs designed to encourage the social protection of women within the institution of the family; 7) to coordinate, promote, and organize the implementation of programs designed to inform and orient women about social, cultural, and recreational activities; 8) to maintain relations with national and international organizations related to its area of competence; and 9) to carry out other duties set by laws, regulations, and resolutions. full text

  15. Beyond Coordination: Joint Planning and Program Execution. The IHPRPT Materials Working Group

    NASA Technical Reports Server (NTRS)

    Stropki, Michael A.; Cleyrat, Danial A.; Clinton, Raymond G., Jr.; Rogacki, John R. (Technical Monitor)

    2000-01-01

    "Partnership is more than just coordination," stated then-Commander of the Air Force Research Laboratory (AFRL), Major General Dick Paul (USAF-Ret), at this year's National Space and Missile Materials Symposium. His comment referred to the example of the joint planning and program execution provided by the Integrated High Payoff Rocket Propulsion Technology (IHPRPT) Materials Working Group (IMWG). Most people agree that fiscal pressures imposed by shrinking budgets have made it extremely difficult to build upon our existing technical capabilities. In times of sufficient budgets, building advanced systems poses no major difficulties. However, with today's budgets, realizing enhanced capabilities and developing advanced systems often comes at an unaffordable cost. Overcoming this problem represents both a challenge and an opportunity to develop new business practices that allow us to develop advanced technologies within the restrictions imposed by current funding levels. Coordination of technology developments between different government agencies and organizations is a valuable tool for technology transfer. However, rarely do the newly developed technologies have direct applicability to other ongoing programs. Technology requirements are typically determined up-front during the program planning stage so that schedule risk can be minimized. The problem with this process is that the costs associated with the technology development are often borne by a single program. Additionally, the potential exists for duplication of technical effort. Changing this paradigm is a difficult process but one that can be extremely worthwhile should the right opportunity arise. The IMWG is one such example where NASA, the DoD, and industry have developed joint requirements that are intended to satisfy multiple program needs. More than mere coordination, the organizations comprising the group come together as partners, sharing information and resources, proceeding from a joint roadmap.

  16. Strategies for the nurse executive to keep the rural hospitals open.

    PubMed

    Shride, S E

    1997-01-01

    Rural hospitals are confronted with multiple challenges to survive in the competitive health care environment of today's world. Declining population, corporate mergers and downsizing, transportation, cost of technology, and health manpower shortages are only a few of the issues rural hospitals must be prepared to address in order to survive. Federal- and state-administered programs are available that can contribute to the survival of the rural hospital. The nurse executive has a key role in contributing to the planning, development, and implementation of survival strategies.

  17. The Future of Nearshore Processes Research: U.S. Integrated Coastal Research Program

    NASA Astrophysics Data System (ADS)

    Elko, N.; Feddersen, F.; Foster, D. L.; Hapke, C. J.; Holman, R. A.; McNinch, J.; Mulligan, R. P.; Ozkan-Haller, H. T.; Plant, N. G.; Raubenheimer, B.

    2016-02-01

    The authors, representing the acting Nearshore Advisory Council, have developed an implementation plan for a U.S. Nearshore Research Program based on the 2015 Future of Nearshore Processes report that was authored by the nearshore community. The objectives of the plan are to link research programs across federal agencies, NGOs, industry, and academia into an integrated national program and to increase academic and NGO participation in federal agency nearshore processes research. A primary recommendation is interagency collaboration to build a research program that will coordinate and fund U.S. nearshore processes research across three broad research themes: 1) long-term coastal evolution due to natural and anthropogenic processes; 2) extreme events; and 3) physical, biological and chemical processes impacting human and ecosystem health. The plan calls for a new program to be developed by an executive committee of federal agency leaders, NGOs, and an academic representative, created similarly to the existing NOPP program. This leadership will be established prior to the 2016 Ocean Sciences meeting and will have agreed on responsibilities and a schedule for development of the research program. To begin to understand the scope of today's U.S. coastal research investment, a survey was distributed to ten federal agency R&D program heads. Six of the ten agencies indicated that they fund coastal research, with a combined annual coastal research budget of nearly 100 million (NSF has not responded). The priority of the three research themes were ranked nearly equally and potential research support ranged from 15-19 million for each theme, with approximately 12 million as direct contribution to academic research. Beyond addressing our fundamental science questions, it is critical that the nearshore community stay organized to represent academic interests on the new executive committee. The program goal is the integration of academic, NGO, and federal agencies.

  18. 48 CFR 606.370 - Department of State standardization program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 606.370... competition in all procurement actions. The authority at 41 U.S.C. 253(c)(1) shall be used with respect to... activity competition advocate, and the Procurement Executive shall approve all Justifications for Other...

  19. 48 CFR 606.370 - Department of State standardization program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COMPETITION AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Other Than Full and Open Competition 606.370... competition in all procurement actions. The authority at 41 U.S.C. 253(c)(1) shall be used with respect to... activity competition advocate, and the Procurement Executive shall approve all Justifications for Other...

  20. Focus on Teaching the Humanities.

    ERIC Educational Resources Information Center

    Sheridan, Harriet W., Ed.

    1968-01-01

    Six articles on the problems in planning and executing a high school humanities program are collected here. Wallace Kennedy gives a partial listing of Minnesota teachers and schools that offer humanities in grades 11 and 12. Fred E. H. Schroeder takes up the problems of defining "humanities," selecting good teachers, preparing an interdisciplinary…

  1. Development Achievements for Fiscal 1990.

    ERIC Educational Resources Information Center

    Smoot, Joseph G.

    This document presents the Fiscal Year (FY) 1990 report of Kansas' Pittsburg State University's (PSU) development program. The report addresses the annual fund, the campaign for distinction, the PSU foundation, and development plans for FY 1991. It includes an overview of FY 1990 activities and an executive summary. Among the findings presented…

  2. 78 FR 19497 - Center for Scientific Review; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ...: Provide advice to the Director, Center for Scientific Review (CSR), on matters related to planning, execution, conduct, support, review, evaluation, and receipt and referral of grant applications at CSR[email protected]csr.nih.gov . (Catalogue of Federal Domestic Assistance Program Nos. 93.306, Comparative Medicine; 93...

  3. The Automated Instrumentation and Monitoring System (AIMS) reference manual

    NASA Technical Reports Server (NTRS)

    Yan, Jerry; Hontalas, Philip; Listgarten, Sherry

    1993-01-01

    Whether a researcher is designing the 'next parallel programming paradigm,' another 'scalable multiprocessor' or investigating resource allocation algorithms for multiprocessors, a facility that enables parallel program execution to be captured and displayed is invaluable. Careful analysis of execution traces can help computer designers and software architects to uncover system behavior and to take advantage of specific application characteristics and hardware features. A software tool kit that facilitates performance evaluation of parallel applications on multiprocessors is described. The Automated Instrumentation and Monitoring System (AIMS) has four major software components: a source code instrumentor which automatically inserts active event recorders into the program's source code before compilation; a run time performance-monitoring library, which collects performance data; a trace file animation and analysis tool kit which reconstructs program execution from the trace file; and a trace post-processor which compensate for data collection overhead. Besides being used as prototype for developing new techniques for instrumenting, monitoring, and visualizing parallel program execution, AIMS is also being incorporated into the run-time environments of various hardware test beds to evaluate their impact on user productivity. Currently, AIMS instrumentors accept FORTRAN and C parallel programs written for Intel's NX operating system on the iPSC family of multi computers. A run-time performance-monitoring library for the iPSC/860 is included in this release. We plan to release monitors for other platforms (such as PVM and TMC's CM-5) in the near future. Performance data collected can be graphically displayed on workstations (e.g. Sun Sparc and SGI) supporting X-Windows (in particular, Xl IR5, Motif 1.1.3).

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Benioff, R.; Ness, E.; Hirst, J.

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date withmore » the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.« less

  5. Department of Defense counterdrug technology development of non-intrusive inspection systems

    NASA Astrophysics Data System (ADS)

    Pennella, John J.

    1997-02-01

    The Naval Surface Warfare Center Dahlgren Division serves as the executive agent for the DoD's Contraband Detection and Cargo Container Inspection Technology Development Program. The goal of the DoD non-intrusive inspection (NII) program is to develop prototype equipment that can be used to inspect containers and vehicles, quickly and in large numbers without unnecessary delays in the movement of legitimate cargo. This paper summaries the past accomplishments of the program, current status, and future plans.

  6. Creating the Action Model for High Risk Infant Follow Up Program in Iran

    PubMed Central

    Heidarzadeh, Mohammad; Jodiery, Behzad; Mirnia, Kayvan; Akrami, Forouzan; Hosseini, Mohammad Bagher; Heidarabadi, Seifollah; HabibeLahi, Abbas

    2013-01-01

    Abstract Background Intervention in early childhood development as one of the social determinants of health, is important for reducing social gap and inequity. In spite of increasingly developing intensive neonatal care wards and decreasing neonatal mortality rate, there is no follow up program in Iran. This study was carreid out to design high risk infants follow up care program with the practical aim of creating an model action for whole country, in 2012. Methods This qualitative study has been done by the Neonatal Department of the Deputy of Public Health in cooperation with Pediatrics Health Research Center of Tabriz University of Medical Sciences, Iran. After study of international documents, consensus agreement about adapted program for Iran has been accomplished by focus group discussion and attended Delphi agreement technique. After compiling primary draft included evidence based guidelines and executive plan, 14 sessions including expert panels were hold to finalize the program. Results After finalizing the program, high risk infants follow up care service package has been designed in 3 chapters: Evidence based clinical guidelines; eighteen main clinical guidelines and thirteen subsidiaries clinical guidelines, executive plan; 6 general, 6 following up and 5 backup processes. Education program including general and especial courses for care givers and follow up team, and family education processes. Conclusion We designed and finalized high risk infants follow up care service package. It seems to open a way to extend it to whole country. PMID:26171344

  7. Automated Instrumentation, Monitoring and Visualization of PVM Programs Using AIMS

    NASA Technical Reports Server (NTRS)

    Mehra, Pankaj; VanVoorst, Brian; Yan, Jerry; Lum, Henry, Jr. (Technical Monitor)

    1994-01-01

    We present views and analysis of the execution of several PVM (Parallel Virtual Machine) codes for Computational Fluid Dynamics on a networks of Sparcstations, including: (1) NAS Parallel Benchmarks CG and MG; (2) a multi-partitioning algorithm for NAS Parallel Benchmark SP; and (3) an overset grid flowsolver. These views and analysis were obtained using our Automated Instrumentation and Monitoring System (AIMS) version 3.0, a toolkit for debugging the performance of PVM programs. We will describe the architecture, operation and application of AIMS. The AIMS toolkit contains: (1) Xinstrument, which can automatically instrument various computational and communication constructs in message-passing parallel programs; (2) Monitor, a library of runtime trace-collection routines; (3) VK (Visual Kernel), an execution-animation tool with source-code clickback; and (4) Tally, a tool for statistical analysis of execution profiles. Currently, Xinstrument can handle C and Fortran 77 programs using PVM 3.2.x; Monitor has been implemented and tested on Sun 4 systems running SunOS 4.1.2; and VK uses XIIR5 and Motif 1.2. Data and views obtained using AIMS clearly illustrate several characteristic features of executing parallel programs on networked workstations: (1) the impact of long message latencies; (2) the impact of multiprogramming overheads and associated load imbalance; (3) cache and virtual-memory effects; and (4) significant skews between workstation clocks. Interestingly, AIMS can compensate for constant skew (zero drift) by calibrating the skew between a parent and its spawned children. In addition, AIMS' skew-compensation algorithm can adjust timestamps in a way that eliminates physically impossible communications (e.g., messages going backwards in time). Our current efforts are directed toward creating new views to explain the observed performance of PVM programs. Some of the features planned for the near future include: (1) ConfigView, showing the physical topology of the virtual machine, inferred using specially formatted IP (Internet Protocol) packets: and (2) LoadView, synchronous animation of PVM-program execution and resource-utilization patterns.

  8. Developing an effective business plan.

    PubMed

    Lehman, L B

    1996-06-01

    At some time, virtually all managed care executives, and most physician executives, will be asked to develop business plans. Business plans are thoughtful, comprehensive, and realistic descriptions of the many aspects of the formulation of a new business product or line for market. The author describes what goes into the writing of a business plan and how the physician executive should approach this task.

  9. The ADEPT Framework for Intelligent Autonomy

    NASA Technical Reports Server (NTRS)

    Ricard, Michael; Kolitz, Stephan

    2003-01-01

    This paper describes the design and implementation of Draper Laboratory's All-Domain Execution and Planning Technology (ADEPT) architecture for intelligent autonomy. Intelligent autonomy is the ability to plan and execute complex activities in a manner that provides rapid, effective response to stochastic and dynamic mission events. Thus, intelligent autonomy enables the high-level reasoning and adaptive behavior for an unmanned vehicle that is provided by an operator in man-in-the-loop systems. Draper s intelligent autonomy has architecture evolved over a decade and a half beginning in the mid 1980's culminating in an operational experiment funded under DARPA's Autonomous Minehunting and Mapping Technologies (AMMT) unmanned undersea vehicle program. ADEPT continues to be refined through its application to current programs that involve air vehicles, satellites and higher-level planning used to direct multiple vehicles. The objective of ADEPT is to solidify a proven, dependable software approach that can be quickly applied to new vehicles and domains. The architecture can be viewed as a hierarchical extension of the sense-think-act paradigm of intelligence and has strong parallels with the military's Observe-Orient-Decide-Act (OODA) loop. The key elements of the architecture are planning and decision-making nodes comprising modules for situation assessment, plan generation, plan implementation and coordination. A reusable, object-oriented software framework has been developed that implements these functions. As the architecture is applied to new areas, only the application specific software needs to be developed. This paper describes the core architecture in detail and discusses how this has been applied in the undersea, air, ground and space domains.

  10. Speech-language pathology telehealth in rural and remote schools: the experience of school executive and therapy assistants.

    PubMed

    Fairweather, Glenn C; Lincoln, Michelle A; Ramsden, Robyn

    2017-01-01

    Difficulties in accessing allied health services, especially in rural and remote areas, appear to be driving the use of telehealth services to children in schools. The objectives of this study were to investigate the experiences and views of school executive staff and therapy assistants regarding the feasibility and acceptability of a speech-language pathology telehealth program for children attending schools in rural and remote New South Wales, Australia. The program, called Come N See, provided therapy interventions remotely via low-bandwidth videoconferencing, with email follow-up. Over a 12-week period, children were offered therapy blocks of six fortnightly sessions, each lasting a maximum of 30 minutes. School executives (n=5) and therapy assistants (n=6) described factors that promoted or threatened the program's feasibility and acceptability, during semistructured interviews. Thematic content analysis with constant comparison was applied to the transcribed interviews to identify relationships in the data. Emergent themes related to (a) unmet speech pathology needs, (b) building relationships, (c) telehealth's advantages, (d) telehealth's disadvantages, (e) anxiety replaced by joy and confidence in growing skills, and (f) supports. School executive staff and therapy assistants verified that the delivery of the school-based telehealth service was feasible and acceptable. However, the participants saw significant opportunities to enhance this acceptability through building into the program stronger working relationships and supports for stakeholders. These findings are important for the future development of allied health telehealth programs that are sustainable as well as effective and fit the needs of all crucial stakeholders. The results have significant implications for speech pathology clinical practice relating to technology, program planning and teamwork within telehealth programs.

  11. NASA Boeing 757 HIRF test series low power on-the-ground tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poggio, A.J.; Pennock, S.T.; Zacharias, R.A.

    1996-08-01

    The data acquisition phase of a program intended to provide data for the validation of computational, analytical, and experimental techniques for the assessment of electromagnetic effects in commercial transports; for the checkout of instrumentation for following test programs; and for the support of protection engineering of airborne systems has been completed. Funded by the NASA Fly-By-Light/ Power-By-Wire Program, the initial phase involved on-the-ground electromagnetic measurements using the NASA Boeing 757 and was executed in the LESLI Facility at the USAF Phillips Laboratory. The major participants in this project were LLNL, NASA Langley Research Center, Phillips Laboratory, and UIE, Inc. Themore » tests were performed over a five week period during September through November, 1994. Measurements were made of the fields coupled into the aircraft interior and signals induced in select structures and equipment under controlled illumination by RF fields. A characterization of the ground was also performed to permit ground effects to be included in forthcoming validation exercises. This report and the associated test plan that is included as an appendix represent a definition of the overall on-the-ground test program. They include descriptions of the test rationale, test layout, and samples of the data. In this report, a detailed description of each executed test is provided, as is the data identification (data id) relating the specific test with its relevant data files. Samples of some inferences from the data that will be useful in protection engineering and EM effects mitigation are also presented. The test plan which guided the execution of the tests, a test report by UIE Inc., and the report describing the concrete pad characterization are included as appendices.« less

  12. General Temporal Knowledge for Planning and Data Mining

    NASA Technical Reports Server (NTRS)

    Morris, Robert; Khatib, Lina

    2001-01-01

    We consider the architecture of systems that combine temporal planning and plan execution and introduce a layer of temporal reasoning that potential1y improves both the communication between humans and such systems, and the performance of the temporal planner itself. In particular, this additional layer simultaneously supports more flexibility in specifying and maintaining temporal constraints on plans within an uncertain and changing execution environment, and the ability to understand and trace the progress of plan execution. It is shown how a representation based on single set of abstractions of temporal information can be used to characterize the reasoning underlying plan generation and execution interpretation. The complexity of such reasoning is discussed.

  13. NIRcam-NIRSpec GTO Observations of Galaxy Evolution

    NASA Astrophysics Data System (ADS)

    Rieke, Marcia J.; Ferruit, Pierre; Alberts, Stacey; Bunker, Andrew; Charlot, Stephane; Chevallard, Jacopo; Dressler, Alan; Egami, Eiichi; Eisenstein, Daniel; Endsley, Ryan; Franx, Marijn; Frye, Brenda L.; Hainline, Kevin; Jakobsen, Peter; Lake, Emma Curtis; Maiolino, Roberto; Rix, Hans-Walter; Robertson, Brant; Stark, Daniel; Williams, Christina; Willmer, Christopher; Willott, Chris J.

    2017-06-01

    The NIRSpec and and NIRCam GTO Teams are planning a joint imaging and spectroscopic study of the high redshift universe. By virtue of planning a joint program which includes medium and deep near- and mid-infrared imaging surveys and multi-object spectroscopy (MOS) of sources in the same fields, we have learned much about planning observing programs for each of the instruments and using them in parallel mode to maximize photon collection time. The design and rationale for our joint program will be explored in this talk with an emphasis on why we have chosen particular suites of filters and spectroscopic resolutions, why we have chosen particular exposure patterns, and how we have designed the parallel observations. The actual observations that we intend on executing will serve as examples of how to layout mosaics and MOS observations to maximize observing efficiency for surveys with JWST.

  14. International Academy of Astronautics 5th cosmic study—preparing for a 21st century program of integrated, Lunar and Martian exploration and development (executive summary)

    NASA Astrophysics Data System (ADS)

    Koelle, H. H.; Stephenson, D. G.

    2003-04-01

    This report is an initial review of plans for a extensive program to survey and develop the Moon and to explore the planet Mars during the 21st century. It presents current typical plans for separate, associated and fully integrated programs of Lunar and Martian research, exploration and development, and concludes that detailed integrated plans must be prepared and be subject to formal criticism. Before responsible politicians approve a new thrust into space they will demand attractive, defensible, and detailed proposals that explain the WHEN, HOW and WHY of each stage of an expanded program of 21st century space research, development and exploration. In particular, the claims of daring, innovative, but untried systems must be compared with the known performance of existing technologies. The time has come to supersede the present haphazard approach to strategic space studies with a formal international structure to plan for future advanced space missions under the aegis of the world's national space agencies, and supported by governments and the corporate sector.

  15. The NASA automation and robotics technology program

    NASA Technical Reports Server (NTRS)

    Holcomb, Lee B.; Montemerlo, Melvin D.

    1986-01-01

    The development and objectives of the NASA automation and robotics technology program are reviewed. The objectives of the program are to utilize AI and robotics to increase the probability of mission success; decrease the cost of ground control; and increase the capability and flexibility of space operations. There is a need for real-time computational capability; an effective man-machine interface; and techniques to validate automated systems. Current programs in the areas of sensing and perception, task planning and reasoning, control execution, operator interface, and system architecture and integration are described. Programs aimed at demonstrating the capabilities of telerobotics and system autonomy are discussed.

  16. Techniques of Water-Resources Investigations of the United States Geological Survey. Book 3, Applications of Hydraulics. Chapter B2, Introduction to Ground-Water Hydraulics: Programed Text for Self-Instruction.

    ERIC Educational Resources Information Center

    Bennett, Gordon D.

    This programmed text of self-instruction is one of a series of manuals on techniques describing procedures for planning and executing specialized work in water-resources investigations. It has been prepared on the assumption that the reader has completed standard courses in calculus and college physics and is presented in eight parts. Part I…

  17. Online Learning Program Strategic Planning and Execution: Considering Goals, Benefits, Problems and Communities of Practice

    ERIC Educational Resources Information Center

    Sawyer, Edward A.; Howard, Caroline

    2007-01-01

    The nation's social agenda for improving education and training has converged with national economic forces (Hornbeck & Salamon, 1991). The emphasis on lifelong learning of the workforce through education, training and development, demands for ever-improving productivity and significant technological advancements have required new tools to…

  18. National Drug Control Strategy. FY 2009 Budget Summary

    ERIC Educational Resources Information Center

    The White House, 2008

    2008-01-01

    The National Drug Control Budget Summary identifies resources and performance indicators for programs within the Executive Branch that are integral to the President's National Drug Control Strategy. The Strategy, which is the Administration's plan for reducing drug use and availability, is based on three pillars: (1) Stopping Use Before It Starts,…

  19. 77 FR 23250 - Statement of Organization, Functions, and Delegations of Authority; Administration for Community...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ... Community Living (ACL) provides national leadership and direction to plan, manage, develop, and raise... Management and Budget (BE) B.20 Functions. ACL is the principal agency designated to lead aging and... executive direction, leadership, and guidance for ACL programs, and serves as the focal point for the...

  20. Educational Foundations--Alternative Development Strategies: Insurance for a Solvent Community College System.

    ERIC Educational Resources Information Center

    Luck, Michael F.

    Educational foundations for raising and allocating private funds have a legitimate place in the community college. They allow a college to chart its growth, anticipate emergencies, and meet the needs of all sectors of the institution. Foundations must utilize an active development program for planning and executing a conscious, continuous effort…

  1. 75 FR 80828 - Submission for OMB Review; Comment Request; The NIH-American Association for Retired Persons...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-23

    ... Division of Cancer Epidemiology and Genetics of the National Cancer Institute has planned this study to... Genetics of the National Cancer Institute (NCI) to establish and support programs for the detection... Cancer Epidemiology and Genetics, National Cancer Institute, NIH, DHHS, Executive Plaza South, Room 3040...

  2. Mitigating Errors of Representation: A Practical Case Study of the University Experience Survey

    ERIC Educational Resources Information Center

    Whiteley, Sonia

    2014-01-01

    The Total Survey Error (TSE) paradigm provides a framework that supports the effective planning of research, guides decision making about data collection and contextualises the interpretation and dissemination of findings. TSE also allows researchers to systematically evaluate and improve the design and execution of ongoing survey programs and…

  3. 75 FR 19665 - Notice of Action Subject to Intergovernmental Review Under Executive Order 12372

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-15

    ... the address section. A copy of this notice also is being furnished to the respective State single... area-wide small business assistance plan adopted by a State authorized agency. DATES: A State single..., women, exporters, the disabled, and minorities. SBDC Program Requirements An SBDC must meet programmatic...

  4. Autonomous Student Experiences in Outdoor and Adventure Education

    ERIC Educational Resources Information Center

    Daniel, Brad; Bobilya, Andrew J.; Kalisch, Kenneth R.; McAvoy, Leo H.

    2014-01-01

    This article explores the current state of knowledge regarding the use of autonomous student experiences (ASE) in outdoor and adventure education (OAE) programs. ASE are defined as components (e.g., solo, final expedition) in which participants have a greater measure of choice and control over the planning, execution, and outcomes of their…

  5. NIF Operations Management Plan, August 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Wonterghem, Bruno M.

    Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in themore » laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the requirements, document flow down, organizational vision and mission, performance metrics, and interrelationship of the NIF Operations organization with other directorate and laboratory organizations. This document also provides a listing of roles and responsibilities, core processes, procedures, authority matrices, change control boards, and other information necessary for successfully functioning in the NIF Operations organization. This document, the NIF Shot Operations Plan, and the NIF Maintenance Plan together represent the primary documents satisfying our Conduct of Operations compliance requirement.« less

  6. Verification and Planning Based on Coinductive Logic Programming

    NASA Technical Reports Server (NTRS)

    Bansal, Ajay; Min, Richard; Simon, Luke; Mallya, Ajay; Gupta, Gopal

    2008-01-01

    Coinduction is a powerful technique for reasoning about unfounded sets, unbounded structures, infinite automata, and interactive computations [6]. Where induction corresponds to least fixed point's semantics, coinduction corresponds to greatest fixed point semantics. Recently coinduction has been incorporated into logic programming and an elegant operational semantics developed for it [11, 12]. This operational semantics is the greatest fix point counterpart of SLD resolution (SLD resolution imparts operational semantics to least fix point based computations) and is termed co- SLD resolution. In co-SLD resolution, a predicate goal p( t) succeeds if it unifies with one of its ancestor calls. In addition, rational infinite terms are allowed as arguments of predicates. Infinite terms are represented as solutions to unification equations and the occurs check is omitted during the unification process. Coinductive Logic Programming (Co-LP) and Co-SLD resolution can be used to elegantly perform model checking and planning. A combined SLD and Co-SLD resolution based LP system forms the common basis for planning, scheduling, verification, model checking, and constraint solving [9, 4]. This is achieved by amalgamating SLD resolution, co-SLD resolution, and constraint logic programming [13] in a single logic programming system. Given that parallelism in logic programs can be implicitly exploited [8], complex, compute-intensive applications (planning, scheduling, model checking, etc.) can be executed in parallel on multi-core machines. Parallel execution can result in speed-ups as well as in larger instances of the problems being solved. In the remainder we elaborate on (i) how planning can be elegantly and efficiently performed under real-time constraints, (ii) how real-time systems can be elegantly and efficiently model- checked, as well as (iii) how hybrid systems can be verified in a combined system with both co-SLD and SLD resolution. Implementations of co-SLD resolution as well as preliminary implementations of the planning and verification applications have been developed [4]. Co-LP and Model Checking: The vast majority of properties that are to be verified can be classified into safety properties and liveness properties. It is well known within model checking that safety properties can be verified by reachability analysis, i.e, if a counter-example to the property exists, it can be finitely determined by enumerating all the reachable states of the Kripke structure.

  7. Human Views: Extensions to the Department of Defense Architecture Framework

    DTIC Science & Technology

    2008-09-01

    évaluent et prédisent les implications. Étant donné la complexité inhérente aux relations dans les S de S, l’absence de VH bien définies et universellement ...n.d.): 1. A Planning, Programming, Budgeting, and Execution process is used to conduct strategic planning and make resource allocation decisions; 2...Responsibilities in the form of functions and tasks have been allocated to each MMEV crew member. In addition, a set of competency requirements (e.g., KSA) has

  8. Adolescent health promotion and the School Health Program: complexity in the articulation of health and education.

    PubMed

    Brasil, Eysler Gonçalves Maia; Silva, Raimunda Magalhães da; Silva, Maria Rocineide Ferreira da; Rodrigues, Dafne Paiva; Queiroz, Maria Veraci Oliveira

    2017-01-01

    Objective To analyze the context of health promotion with adolescents in the health and education interface focusing on the actions of the Brazilian School Health Program. Qualitative study conducted in 2015 with professionals working in the Regional Executive Coordination IV, in Fortaleza, Ceará. The data obtained in the interview were processed in the ALCESTE program. 17 health professionals and 22 education professionals participated in the study. The organization of spontaneous demand causes disharmony in the scheduled visits and health actions in the school. The difficulties in the implementation of the School Health Program were demonstrated by the lack of knowledge, the lack of planning among the sectors and the different demarcations in the territory. The professionals' lack of knowledge regarding the program and the lack of action planning confirm the disarticulation of the education and health sectors, although they indicate the possibilities of this inter-sectoral practice.

  9. Law of partial reform of the Organic Law of the Central Administration, 11 December 1986.

    PubMed

    1988-01-01

    This document contains the provisions of Venezuela's 1986 Law of Partial Reform of the Organic Law of the Central Administration which sets out the activities of the newly created Ministry of the Family. The duties of the Ministry include protecting the family as a basic cell of society, protecting marriage, facilitating the acquisition of decent housing, formulating and directing state family policy, creating a General Plan for Social Development and Protection for the family, coordinating public sector programs directed towards the family, promoting the decentralization of family programs, formulating and promoting plans and programs to assist the family, advising in the creation of family-related public documents, overseeing the enforcement of legal provisions, conducting research and collecting data on family problems, promoting and executing training programs for family service personnel, and encouraging the formation of private sector programs to benefit the family.

  10. MOD-5A wind turbine generator program design report: Volume 1: Executive Summary

    NASA Technical Reports Server (NTRS)

    1984-01-01

    The design, development and analysis of the 7.3 MW MOD-5A wind turbine generator covering work performed between July 1980 and June 1984 is discussed. The report is divided into four volumes: Volume 1 summarizes the entire MOD-5A program, Volume 2 discusses the conceptual and preliminary design phases, Volume 3 describes the final design of the MOD-5A, and Volume 4 contains the drawings and specifications developed for the final design. Volume 1, the Executive Summary, summarizes all phases of the MOD-5A program. The performance and cost of energy generated by the MOD-5A are presented. Each subsystem - the rotor, drivetrain, nacelle, tower and foundation, power generation, and control and instrumentation subsystems - is described briefly. The early phases of the MOD-5A program, during which the design was analyzed and optimized, and new technologies and materials were developed, are discussed. Manufacturing, quality assurance, and safety plans are presented. The volume concludes with an index of volumes 2 and 3.

  11. Embedding Temporal Constraints For Coordinated Execution in Habitat Automation

    NASA Technical Reports Server (NTRS)

    Morris, Paul; Schwabacher, Mark; Dalal, Michael; Fry, Charles

    2013-01-01

    Future NASA plans call for long-duration deep space missions with human crews. Because of light-time delay and other considerations, increased autonomy will be needed. This will necessitate integration of tools in such areas as anomaly detection, diagnosis, planning, and execution. In this paper we investigate an approach that integrates planning and execution by embedding planner-derived temporal constraints in an execution procedure. To avoid the need for propagation, we convert the temporal constraints to dispatchable form. We handle some uncertainty in the durations without it affecting the execution; larger variations may cause activities to be skipped.

  12. Assessment of planning abilities in individuals with mild cognitive impairment using an open-ended problem-solving task.

    PubMed

    Sanders, Chad; Low, Christina; Schmitter-Edgecombe, Maureen

    2014-01-01

    There is currently limited research evaluating planning abilities, a core subcomponent of executive functioning, in individuals with mild cognitive impairment (MCI). In the present study, we utilized the "Amap Task," an open-ended problem-solving task, to separately evaluate the formulation and execution components of planning ability in individuals with MCI. Thirty-seven cognitively healthy older adults and 37 individuals with MCI used a map layout of a university apartment to develop and write out a strategy (formulation stage) to successfully complete a list of tasks (e.g., retrieve and fill a water pitcher before placing it in the refrigerator). Subsequently, participants carried out the tasks in the apartment with the aid of their formulated plan (execution stage). MCI participants performed more poorly than older adult (OA) controls during both the formulation and execution stages on measures of task accuracy and task efficiency. However, both groups were able to adjust and improve task accuracy and efficiency from formulation to task execution. Finally, MCI participants took significantly longer to complete the task and adhered less to their formulated plans during task completion. Using an open-ended problem-solving task, the findings revealed that individuals with MCI experienced difficulties with both the formulation and execution components of planning. Like controls, participants with MCI were able to successfully modify their plan online, improving their performance from task formulation to task execution.

  13. Computer-supported implant planning and guided surgery: a narrative review.

    PubMed

    Vercruyssen, Marjolein; Laleman, Isabelle; Jacobs, Reinhilde; Quirynen, Marc

    2015-09-01

    To give an overview of the workflow from examination to planning and execution, including possible errors and pitfalls, in order to justify the indications for guided surgery. An electronic literature search of the PubMed database was performed with the intention of collecting relevant information on computer-supported implant planning and guided surgery. Currently, different computer-supported systems are available to optimize and facilitate implant surgery. The transfer of the implant planning (in a software program) to the operative field remains however the most difficult part. Guided implant surgery clearly reduces the inaccuracy, defined as the deviation between the planned and the final position of the implant in the mouth. It might be recommended for the following clinical indications: need for minimal invasive surgery, optimization of implant planning and positioning (i.e. aesthetic cases), and immediate restoration. The digital technology rapidly evolves and new developments have resulted in further improvement of the accuracy. Future developments include the reduction of the number of steps needed from the preoperative examination of the patient to the actual execution of the guided surgery. The latter will become easier with the implementation of optical scans and 3D-printing. © 2015 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  14. Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Klus, W. J.

    1987-01-01

    The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.

  15. Expect Surprises with 1-to-1 Laptops

    ERIC Educational Resources Information Center

    Tusch, Erich G.

    2012-01-01

    In 2004, prior to the launch of their 1-to-1 laptop program, the superintendent expressed some anxiety about the prospect of radically changing teaching and learning by issuing a laptop computer to every student and teacher. Although the concept was exciting, it carried big risks and would take time and thorough planning to execute well. Even with…

  16. Management of large-scale technology

    NASA Technical Reports Server (NTRS)

    Levine, A.

    1985-01-01

    Two major themes are addressed in this assessment of the management of large-scale NASA programs: (1) how a high technology agency was a decade marked by a rapid expansion of funds and manpower in the first half and almost as rapid contraction in the second; and (2) how NASA combined central planning and control with decentralized project execution.

  17. Laws of Attraction: To Ramp up Alumni Engagement, Give Graduates What They Want

    ERIC Educational Resources Information Center

    Collins, Mary Ellen

    2013-01-01

    Developing an effective engagement strategy begins with an open mind and an outstretched hand. It requires alumni professionals to reconsider how alumni identify themselves within the institution, relinquish some control of the planning and execution of programs, and meet alumni where they are--on terra firma or online. But most of all, it…

  18. Marine Corps Drawdown, Force Structure Initiatives, and Roles and Missions: Background and Issues for Congress

    DTIC Science & Technology

    2014-01-09

    force of 150,000 Marines—a strength level Marine Corps leadership has characterized as unviable to execute our current defense strategy. The Marines...have instituted a number of force shaping programs to reach the 174,000 endstrength. They believe this force level can be achieved through natural...8 Current Planned Drawdown Levels

  19. Florida Satellite Network Study: Report and Recommendations of the Florida Postsecondary Education Planning Commission. 1985--Report 2.

    ERIC Educational Resources Information Center

    Florida State Postsecondary Education Planning Commission, Tallahassee.

    Prepared in response to the 1984 General Appropriations Act (Chapter 84-220, Laws of Florida), this report examines the feasibility of establishing a community college satellite telecommunications network within Florida to allow for the reception of programming transmitted by satellite and for teleconferencing. Following an executive summary,…

  20. Establishing an Adjunct Faculty Professional Development Program for Delaware Technical Community College

    ERIC Educational Resources Information Center

    Mergner, Leslie A.

    2013-01-01

    Higher education is experiencing unprecedented change due to economic and demographic projections, largely focusing on the usage of adjunct faculty. No longer will community colleges be able to rely solely on full-time faculty to ensure that students persist to graduation. This executive position paper provides a proposed plan for a formalized…

  1. United States Military Posture for FY 1987

    DTIC Science & Technology

    1987-01-01

    monitor, plan, and execute mobilization, deployment, employment, and sustainment during peace, crisis, and war. JOPES requirements are being developed ...positioning 68 Deployment Management 69 VI Sustainability 69 Ammunition 69 Petroleum, Oils, and Lubricants 69 Military Construction 69...Commanders in Chiefs 73 Joint Doctrine 73 Combined Doctrine 74 Joint Force Development Process 74 Joint Resource Assessment 75 Joint Program

  2. n/a

    NASA Image and Video Library

    1971-07-26

    During the Apollo 15 pre-launch activity in the launch control center's firing room 1 at Kennedy Space Center, the then recently appointed NASA Administrator, Dr. James C. Fletcher (right) speaks with (Left to right) William Anders, executive secretary of the National Aeronautics and Space Council; Lt. General Sam Phillips, former Apollo Program Director; and Dr. Wernher von Braun, NASA's Deputy Associate Administrator for planning.

  3. Improving the U.S. Navy’s Execution of Technical Authority through a Common Risk Management and Technical Assessment Process

    DTIC Science & Technology

    2008-09-01

    ITP . Assessment Indicators: • Has the risk management team (RMT) provided a risk management plan (RMP)? − Does the RMP provide an organized...processes. Diskettes, which contain the necessary programs for accessing BMP◊NET from IBM -compatible or Macintosh computers with a modem, and answers to

  4. 77 FR 67596 - Approval and Promulgation of Air Quality Implementation Plans; Montana; Revisions to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ... Proposed Action on SIP Revisions V. Summary of EPA's Proposed Action VI. Statutory and Executive Order... Program, unless the context indicates otherwise. (xi) The initials SIP mean or refer to State... September 23, 2011 the State of Montana submitted new rules and revisions to revise the Montana SIP. The...

  5. A Development Program for Metropolitan Junior College, Kansas City. Volume One: Executive Summary.

    ERIC Educational Resources Information Center

    Little (Arthur D.), Inc., San Francisco, CA.

    This five-part report provides a summary of the findings and recommendations resulting from a study conducted to determine the most suitable sites for three Metropolitan Junior College (MJC) campuses and to formulate long-range plans for the development of a comprehensive institution. After presenting introductory material, Part I notes problems…

  6. Ocean Drilling Science Plan to be released soon

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2011-04-01

    The upcoming International Ocean Discovery Program, which is slated to operate from 2013 to 2023 and calls for an internationally funded program focused around four science themes, will pick up right where its predecessor, the Integrated Ocean Drilling Program, ends, explained Kiyoshi Suyehiro, president and chief executive officer of IODP, a convenient acronym that covers both programs. At a 5 April briefing at the 2011 European Geosciences Union General Assembly in Vienna, Austria, he outlined four general themes the new program will address. IODP involves 24 nations and utilizes different ocean drilling platforms that complement each other in drilling in different environments in the oceans.

  7. Fast Transformation of Temporal Plans for Efficient Execution

    NASA Technical Reports Server (NTRS)

    Tsamardinos, Ioannis; Muscettola, Nicola; Morris, Paul

    1998-01-01

    Temporal plans permit significant flexibility in specifying the occurrence time of events. Plan execution can make good use of that flexibility. However, the advantage of execution flexibility is counterbalanced by the cost during execution of propagating the time of occurrence of events throughout the flexible plan. To minimize execution latency, this propagation needs to be very efficient. Previous work showed that every temporal plan can be reformulated as a dispatchable plan, i.e., one for which propagation to immediate neighbors is sufficient. A simple algorithm was given that finds a dispatchable plan with a minimum number of edges in cubic time and quadratic space. In this paper, we focus on the efficiency of the reformulation process, and improve on that result. A new algorithm is presented that uses linear space and has time complexity equivalent to Johnson s algorithm for all-pairs shortest-path problems. Experimental evidence confirms the practical effectiveness of the new algorithm. For example, on a large commercial application, the performance is improved by at least two orders of magnitude. We further show that the dispatchable plan, already minimal in the total number of edges, can also be made minimal in the maximum number of edges incoming or outgoing at any node.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Flory, John Andrew; Padilla, Denise D.; Gauthier, John H.

    Upcoming weapon programs require an aggressive increase in Application Specific Integrated Circuit (ASIC) production at Sandia National Laboratories (SNL). SNL has developed unique modeling and optimization tools that have been instrumental in improving ASIC production productivity and efficiency, identifying optimal operational and tactical execution plans under resource constraints, and providing confidence in successful mission execution. With ten products and unprecedented levels of demand, a single set of shared resources, highly variable processes, and the need for external supplier task synchronization, scheduling is an integral part of successful manufacturing. The scheduler uses an iterative multi-objective genetic algorithm and a multi-dimensional performancemore » evaluator. Schedule feasibility is assessed using a discrete event simulation (DES) that incorporates operational uncertainty, variability, and resource availability. The tools provide rapid scenario assessments and responses to variances in the operational environment, and have been used to inform major equipment investments and workforce planning decisions in multiple SNL facilities.« less

  9. Shuttle Rocket Motor Program: NASA should delay awarding some construction contracts. Report to the Chair, Subcommittee on Government Activities and Transportation, Committee on Government Operations, House of Representatives

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.

  10. International Academy of Astronautics 5th cosmic study--preparing for a 21st century program of integrated, Lunar and Martian exploration and development (executive summary).

    PubMed

    Koelle, H H; Stephenson, D G

    2003-04-01

    This report is an initial review of plans for a extensive program to survey and develop the Moon and to explore the planet Mars during the 21st century. It presents current typical plans for separate, associated and fully integrated programs of Lunar and Martian research, exploration and development, and concludes that detailed integrated plans must be prepared and be subject to formal criticism. Before responsible politicians approve a new thrust into space they will demand attractive, defensible, and detailed proposals that explain the WHEN, HOW and WHY of each stage of an expanded program of 21st century space research, development and exploration. In particular, the claims of daring, innovative, but untried systems must be compared with the known performance of existing technologies. The time has come to supersede the present haphazard approach to strategic space studies with a formal international structure to plan for future advanced space missions under the aegis of the world's national space agencies, and supported by governments and the corporate sector. c2002 Elsevier Science Ltd. All rights reserved.

  11. Automated Instrumentation, Monitoring and Visualization of PVM Programs Using AIMS

    NASA Technical Reports Server (NTRS)

    Mehra, Pankaj; VanVoorst, Brian; Yan, Jerry; Tucker, Deanne (Technical Monitor)

    1994-01-01

    We present views and analysis of the execution of several PVM codes for Computational Fluid Dynamics on a network of Sparcstations, including (a) NAS Parallel benchmarks CG and MG (White, Alund and Sunderam 1993); (b) a multi-partitioning algorithm for NAS Parallel Benchmark SP (Wijngaart 1993); and (c) an overset grid flowsolver (Smith 1993). These views and analysis were obtained using our Automated Instrumentation and Monitoring System (AIMS) version 3.0, a toolkit for debugging the performance of PVM programs. We will describe the architecture, operation and application of AIMS. The AIMS toolkit contains (a) Xinstrument, which can automatically instrument various computational and communication constructs in message-passing parallel programs; (b) Monitor, a library of run-time trace-collection routines; (c) VK (Visual Kernel), an execution-animation tool with source-code clickback; and (d) Tally, a tool for statistical analysis of execution profiles. Currently, Xinstrument can handle C and Fortran77 programs using PVM 3.2.x; Monitor has been implemented and tested on Sun 4 systems running SunOS 4.1.2; and VK uses X11R5 and Motif 1.2. Data and views obtained using AIMS clearly illustrate several characteristic features of executing parallel programs on networked workstations: (a) the impact of long message latencies; (b) the impact of multiprogramming overheads and associated load imbalance; (c) cache and virtual-memory effects; and (4significant skews between workstation clocks. Interestingly, AIMS can compensate for constant skew (zero drift) by calibrating the skew between a parent and its spawned children. In addition, AIMS' skew-compensation algorithm can adjust timestamps in a way that eliminates physically impossible communications (e.g., messages going backwards in time). Our current efforts are directed toward creating new views to explain the observed performance of PVM programs. Some of the features planned for the near future include: (a) ConfigView, showing the physical topology of the virtual machine, inferred using specially formatted IP (Internet Protocol) packets; and (b) LoadView, synchronous animation of PVM-program execution and resource-utilization patterns.

  12. Technology requirements to be addressed by the NASA Lewis Research Center Cryogenic Fluid Management Facility program

    NASA Technical Reports Server (NTRS)

    Aydelott, J. C.; Rudland, R. S.

    1985-01-01

    The NASA Lewis Research Center is responsible for the planning and execution of a scientific program which will provide advance in space cryogenic fluid management technology. A number of future space missions were identified that require or could benefit from this technology. These fluid management technology needs were prioritized and a shuttle attached reuseable test bed, the cryogenic fluid management facility (CFMF), is being designed to provide the experimental data necessary for the technology development effort.

  13. Common Aviation Command and Control System Increment 1 (CAC2S Inc 1)

    DTIC Science & Technology

    2016-03-01

    Command and Control System Increment 1 ( CAC2S Inc 1) DoD Component Navy United States Marine Corps Responsible Office Program Manager References MAIS ...facilities for planning and execution of Marine Aviation missions within the Marine Air Ground Task Force (MAGTF). CAC2S Increment I will eliminate...approved by ASN (RDA), the MDA, in a Program Decision Memorandum (PDM), “ CAC2S Increment I,” May 05, 2009. As the result of the PDM, the independent

  14. Survey of the Schools of Wilmington, Delaware. Part 1: I. The Educational Background; II. School Organization, Supervision, and Finance; III. A School Building Program for Wilmington. Bulletin, 1921, No. 2

    ERIC Educational Resources Information Center

    Bureau of Education, Department of the Interior, 1921

    1921-01-01

    During March of 1920, by resolution of the Board of Education of Wilmington, Delaware, a committee of 30 citizens of the city was appointed to make a survey of the public schools and of the system of education of the city. The executive committee was directed to prepare a plan or program to be followed in making the investigation and survey and to…

  15. Marine Corps Systems Command (MCSC) Program Executive Officer Land Systems (PEO LS) 2010 Advanced Planning Briefing to Industry (APBI) (BRIEFING CHARTS)

    DTIC Science & Technology

    2010-04-07

    Commercialization Pilot Programs – Portable Fuel Analyzer – Non-woven FR Materials – Automatic Test Equipment – Night Vision Fusion • Significant efforts – Sensing...contract with the government". Advertising material , commercial item offer, or contribution, as defined in FAR 15.601 shall not be considered to...systems through the entire lifecycle. Our portfolio includes; •Individual & crew-served weapons ranging from 9 mm handguns to 87mm mortar systems

  16. Analysis of the Apollo spacecraft operational data management system. Executive summary

    NASA Technical Reports Server (NTRS)

    1971-01-01

    A study was made of Apollo, Skylab, and several other data management systems to determine those techniques which could be applied to the management of operational data for future manned spacecraft programs. The results of the study are presented and include: (1) an analysis of present data management systems, (2) a list of requirements for future operational data management systems, (3) an evaluation of automated data management techniques, and (4) a plan for data management applicable to future space programs.

  17. Optimizing Mars Airplane Trajectory with the Application Navigation System

    NASA Technical Reports Server (NTRS)

    Frumkin, Michael; Riley, Derek

    2004-01-01

    Planning complex missions requires a number of programs to be executed in concert. The Application Navigation System (ANS), developed in the NAS Division, can execute many interdependent programs in a distributed environment. We show that the ANS simplifies user effort and reduces time in optimization of the trajectory of a martian airplane. We use a software package, Cart3D, to evaluate trajectories and a shortest path algorithm to determine the optimal trajectory. ANS employs the GridScape to represent the dynamic state of the available computer resources. Then, ANS uses a scheduler to dynamically assign ready task to machine resources and the GridScape for tracking available resources and forecasting completion time of running tasks. We demonstrate system capability to schedule and run the trajectory optimization application with efficiency exceeding 60% on 64 processors.

  18. An application of artificial intelligence to automatic telescopes

    NASA Technical Reports Server (NTRS)

    Swanson, Keith; Drummond, Mark; Bresina, John

    1992-01-01

    Automatic Photoelectric Telescopes (APT's) allow an astronomer to be removed form the telescope site in both time and space. APT's 'execute' an observation program (a set of observation requests) expressed in an ASCII-based language (ATIS) and collect observation results expressed in this same language. The observation program is currently constructed by a Principal Astronomer from the requests of multiple users; the execution is currently controlled by a simple heuristic dispatch scheduler. Research aimed at improving the use of APT's is being carried out by the Entropy Reduction Engine (ERE) project at NASA Ames. The overall goal of the ERE project is the study and construction of systems that integrate planning, scheduling, and control. This paper discusses the application of some ERE technical results to the improvement of both the scheduling and the operation of APT's.

  19. Evolution of the Utah energy research triangle: A contemporary case study in the nexus of applied research and public policy

    NASA Astrophysics Data System (ADS)

    Walker, Alan John

    The evolution of the Utah Energy Research Triangle began August 2009 with Governor Gary Herbert's inauguration. On January 26, 2010 Governor Herbert delivered his first State of the State Address and announced the "most impactful economic initiative ever taken in our state...the Utah Energy Initiative." Even before this speech, actions were underway as the Governor assembled 16 energy professionals who forged Utah's 10-Year Strategic Energy Plan (Plan) released March 2011. The priorities in the Plan included: (1) establishing the Office of Energy Development in 2011; (2) launching the annual Governor's Energy Development Summits beginning in 2012; and (3) executing the first cycle of the Utah Energy Research Triangle in 2013 through 2015. Other objectives would be achieved as the Plan unfolded but those lower priorities are beyond the scope of this case study. This study will review the three priorities noted and focus on the execution of the Energy Research Triangle as a nexus of applied research and public policy. The Plan's vision was to "align the State's main research universities...into a powerful energy research and development triangle...through increased collaboration." In March 2014, execution of the first cycle of the Energy Research Triangle resulted in seven new research efforts across three research university campuses in Utah - Brigham Young University (BYU), Utah State University (USU), and the University of Utah (UofU). These research programs included eighteen researchers tackling principle energy issues: air quality, hydrocarbon transportation, and safety. Seven other researchers were awarded Governor's Energy Leadership Scholarships with requirements to address topics including efficient solar power, cold-weather battery performance, and molten salt energy storage. Final results will be known in June 2015, but collaboration on energy issues is active and ongoing. Together the three research teams are successfully reaching out to industry and federal agencies to expand their capability to address Utah energy issues. This case study provides a road map and lessons learned for developing a meaningful grass roots research program with modest resources. Public policy is notorious for cycling through good ideas. This study provides guidance to solve local issues using the collaborative capabilities of our universities.

  20. Wind-energy Science, Technology and Research (WindSTAR) Consortium: Curriculum, Workforce Development, and Education Plan Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Manwell, James

    2013-03-19

    The purpose of the project is to modify and expand the current wind energy curriculum at the University of Massachusetts Amherst and to develop plans to expand the graduate program to a national scale. The expansion plans include the foundational steps to establish the American Academy of Wind Energy (AAWE). The AAWE is intended to be a cooperative organization of wind energy research, development, and deployment institutes and universities across North America, whose mission will be to develop and execute joint RD&D projects and to organize high-level science and education in wind energy

  1. The benefits of a leadership program and executive coaching for new nursing academic administrators: one college's experience.

    PubMed

    Glasgow, Mary Ellen Smith; Weinstock, Beth; Lachman, Vicki; Suplee, Patricia Dunphy; Dreher, H Michael

    2009-01-01

    Despite attention given to the nursing shortage and now the nursing faculty shortage, what is perhaps less visible but equally critical are the pending retirements of most of the current cadre of academic nursing administrators in the next decade. With only 2.1% of current deans, directors, and department chairs in 2006 aged 45 years or younger, there may be a pending crisis in leadership development and succession planning in our nursing schools and colleges. This article describes an innovative leadership development program for largely new nursing academic administrators, which combined a formal campus-based leadership symposia and executive coaching. This article is particularly useful and practical in that actual case studies are described (albeit modified slightly to protect the identity of the individual administrator), providing a real-life narrative that rarely makes its way into the nursing academic administration literature. The executive coaching focus is very sparsely used in nursing academia, and this college's success using this professional development strategy is likely to become a template for other institutions to follow.

  2. NASA metric transition plan

    NASA Technical Reports Server (NTRS)

    1992-01-01

    NASA science publications have used the metric system of measurement since 1970. Although NASA has maintained a metric use policy since 1979, practical constraints have restricted actual use of metric units. In 1988, an amendment to the Metric Conversion Act of 1975 required the Federal Government to adopt the metric system except where impractical. In response to Public Law 100-418 and Executive Order 12770, NASA revised its metric use policy and developed this Metric Transition Plan. NASA's goal is to use the metric system for program development and functional support activities to the greatest practical extent by the end of 1995. The introduction of the metric system into new flight programs will determine the pace of the metric transition. Transition of institutional capabilities and support functions will be phased to enable use of the metric system in flight program development and operations. Externally oriented elements of this plan will introduce and actively support use of the metric system in education, public information, and small business programs. The plan also establishes a procedure for evaluating and approving waivers and exceptions to the required use of the metric system for new programs. Coordination with other Federal agencies and departments (through the Interagency Council on Metric Policy) and industry (directly and through professional societies and interest groups) will identify sources of external support and minimize duplication of effort.

  3. JWST Operations and the Phase I and II Process

    NASA Astrophysics Data System (ADS)

    Beck, Tracy L.

    2010-07-01

    The JWST operations and Phase I and Phase II process will build upon our knowledge on the current system in use for HST. The primary observing overheads associated with JWST observations, both direct and indirect, are summarized. While some key operations constraints for JWST may cause deviations from the HST model for proposal planning, the overall interface to JWST planning will use the APT and will appear similar to the HST interface. The requirement is to have a proposal planning model simlar to HST, where proposals submitted to the TAC must have at least the minimum amount of information necessary for assessment of the strength of the science. However, a goal of the JWST planning process is to have the submitted Phase I proposal in executable form, and as complete as possible for many programs. JWST will have significant constraints on the spacecraft pointing and orient, so it is beneficial for the planning process to have these scheduling constraints on programs defined as early as possible. The guide field of JWST is also much smaller than the HST guide field, so searches for available guide stars for JWST science programs must be done at the Phase I deadline. The long range observing plan for each JWST cycle will be generated intially from the TAC accepted programs at the Phase I deadline, and the LRP will be refined after the Phase II deadline when all scheduling constraints are defined.

  4. Report of the Terrestrial Bodies Science Working Group. Volume 1: Executive summary. [Terrestrial planets, Galilean satellites, Comets, Asteroids, and the Moon

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Current knowledge of Mercury, Venus, Mars, the Moon, asteroids, comets, and the Galilean satellites were reviewed along with related NASA programs and available mission concepts. Exploration plans for the 1980 to 1990 period are outlined and recommendations made. Topics discussed include: scientific objectives and goals, exploration strategy and recommended mission plans, supporting research and technology, Earth-based and Earth-orbital investigations, data analysis and synthesis, analysis of extraterrestrial materials, broadening the science support base, and international cooperation.

  5. NICMOS Cycles 13 and 14 Calibration Plans

    NASA Astrophysics Data System (ADS)

    Arribas, Santiago; Bergeron, Eddie; de Jong, Roeof; Malhotra, Sangeeta; Mobasher, Bahram; Noll, Keith; Schultz, Al; Wiklind, Tommy; Xu, Chun

    2005-11-01

    This document summarizes the NICMOS Calibration Plans for Cycles 13 and 14. These plans complement the SMOV3b, the Cycle 10 (interim), and the Cycles 11 and 12 (regular) calibration programs executed after the installation of the NICMOS Cooling System (NCS).. These previous programs have shown that the instrument is very stable, which has motivated a further reduction in the frequency of the monitoring programs for Cycle 13. In addition, for Cycle 14 some of these programs were slightly modified to account for 2 Gyro HST operations. The special calibrations on Cycle 13 were focussed on a follow up of the spectroscopic recalibration initiated in Cycle 12. This program led to the discovery of a possible count rate non-linearity, which has triggered a special program for Cycle 13 and a number of subsequent tests and calibrations during Cycle 14. At the time of writing this is a very active area of research. We also briefly comment on other calibrations defined to address other specific issues like: the autoreset test, the SPAR sequences tests, and the low-frequency flat residual for NIC1. The calibration programs for the 2-Gyro campaigns are not included here, since they have been described somewhere else. Further details and updates on specific programs can be found via the NICMOS web site.

  6. Gag rule is formally suspended as Title X renewal advances in House.

    PubMed

    1993-02-09

    In February 1993, the US House of Representatives reintroduced a bill (HR 670) which was similar to an earlier bill introduced during the Bush Administration in late 1992 to override a Supreme Court decision upholding Reagan's executive order and vetoed by President Bush. This executive order restricted abortion counseling at federally funded clinics. Bill HR 670 clarified congressional intent of Title X. It also called for increased funding for Title X programs. The bill cleared the full Energy and Commerce Committee within 2 days. Family planning groups and the Clinton Administration strongly supported this bill. Acting Assistant Secretary for Health opposed a proposed restrictive parental notification amendment, however, which the full committee had defeated (18-25). The bill should have reached the Senate shortly after the winter recess. Also in February, the Clinton Administration suspended the Title X gag rule regulations implemented during the waning days of the Reagan Administration and upheld during the waning days of the Reagan Administration and upheld during the Bush Administration. The Clinton Administration did so by issuing an interim rule which returned oversight of federally supported family planning clinics to previous regulations and policies, e.g., US Department of Health and Human Services (DHHS) 1981 Program Guidelines for Family Planning Projects. It also issued a proposed rule which could become law after a 60-day comment period. Therefore the new rulings required federally supported clinics to provide nondirective counseling and abortion referrals upon request for women with unwanted pregnancies. DHHS' Office for Population Affairs continued to administer the Title X program.

  7. Parliamentarians play key role in linking population and social development.

    PubMed

    1995-01-01

    Mr. Hirofunti Ando, Deputy Executive Director of the UNFPA, delivered the statement of Dr. Nafis Sadik, Executive Director of the UNFPA at the International Meeting of Parliamentarians on Population and Social Development. The International Conference of Parliamentarians on Population and Development (ICPPD) in Cairo in September 1994 made a significant impact on the attitudes and support of parliamentarians regarding population issues. The Asian Forum of Parliamentarians on Population and Development (AFPPD) brought together a group of parliamentarians from all over the world to discuss population issues and social development. The World Summit included in its deliberations the accumulated experiences of earlier international conferences dealing with social economic issues. The ICPD Program of Action addressed concerns relevant to the agenda of the Social Summit: the crucial contribution that early population stabilization will make towards the attainment of sustainable development; the significant role of integrated policies on population and development in creating employment; the importance of population policies and programs in alleviating poverty; the contributions of reproductive health policies, including high-quality family planning services, to the enhancement of the status of women and to the achievement of gender equality; the synergy between education, family planning, and the general improvement of the human condition; and the relationship between population pressures, poverty, and environmental degradation. The ICPD Program of Action also identified critically important population and development objectives, such as ensuring access to education, especially of girls; reducing infant, child, and maternal mortality; and providing universal access to reproductive health and family planning services. Now the challenge is to mobilize the necessary resources for the Social Summit.

  8. The Square Kilometre Array Epoch of Reionisation and Cosmic Dawn Experiment

    NASA Astrophysics Data System (ADS)

    Trott, Cathryn M.

    2018-05-01

    The Square Kilometre Array (SKA) Epoch of Reionisation and Cosmic Dawn (EoR/CD) experiments aim to explore the growth of structure and production of ionising radiation in the first billion years of the Universe. Here I describe the experiments planned for the future low-frequency components of the Observatory, and work underway to define, design and execute these programs.

  9. Focus and Planning Skills Can Be Improved "before" a Child Enters School. Science Brief

    ERIC Educational Resources Information Center

    National Scientific Council on the Developing Child, 2008

    2008-01-01

    This brief describes the findings of a study that tested preschoolers' executive function skills after participating in a program designed to enhance them vs. a standard curriculum. A total of 147 5-year-olds in their second year of preschool from a lower-income, urban school district participated in this study. The preschoolers were in 18…

  10. Analysis of nuclear waste disposal in space, phase 3. Volume 1: Executive summary of technical report

    NASA Technical Reports Server (NTRS)

    Rice, E. E.; Miller, N. E.; Yates, K. R.; Martin, W. E.; Friedlander, A. L.

    1980-01-01

    The objectives, approach, assumptions, and limitations of a study of nuclear waste disposal in space are discussed with emphasis on the following: (1) payload characterization; (2) safety assessment; (3) health effects assessment; (4) long-term risk assessment; and (5) program planning support to NASA and DOE. Conclusions are presented for each task.

  11. Cognitive Training for Improving Executive Function in Chemotherapy-Treated Breast Cancer Survivors

    PubMed Central

    Kesler, Shelli; Hosseini, S. M. Hadi; Heckler, Charles; Janelsins, Michelle; Palesh, Oxana; Mustian, Karen; Morrow, Gary

    2013-01-01

    Difficulties with thinking and problem solving are very common among breast cancer survivors. We tested a computerized cognitive training program for 41 breast cancer survivors. The training program was associated with significant improvements in thinking and problem-solving skills. Our findings demonstrate potential for our online, home-based cognitive training program to improve cognitive difficulties among breast cancer survivors. Background A majority of breast cancer (BC) survivors, particularly those treated with chemotherapy, experience long-term cognitive deficits that significantly reduce quality of life. Among the cognitive domains most commonly affected include executive functions (EF), such as working memory, cognitive flexibility, multitasking, planning, and attention. Previous studies in other populations have shown that cognitive training, a behavioral method for treating cognitive deficits, can result in significant improvements in a number of cognitive skills, including EF. Materials and Methods In this study, we conducted a randomized controlled trial to investigate the feasibility and preliminary effectiveness of a novel, online EF training program in long-term BC survivors. A total of 41 BC survivors (21 active, 20 wait list) completed the 48 session training program over 12 weeks. The participants were, on average, 6 years after therapy. Results Cognitive training led to significant improvements in cognitive flexibility, verbal fluency and processing speed, with marginally significant downstream improvements in verbal memory as assessed via standardized measures. Self-ratings of EF skills, including planning, organizing, and task monitoring, also were improved in the active group compared with the wait list group. Conclusions Our findings suggest that EF skills may be improved even in long-term survivors by using a computerized, home-based intervention program. These improvements may potentially include subjective EF skills, which suggest a transfer of the training program to real-world behaviors. PMID:23647804

  12. DIALOG: An executive computer program for linking independent programs

    NASA Technical Reports Server (NTRS)

    Glatt, C. R.; Hague, D. S.; Watson, D. A.

    1973-01-01

    A very large scale computer programming procedure called the DIALOG Executive System has been developed for the Univac 1100 series computers. The executive computer program, DIALOG, controls the sequence of execution and data management function for a library of independent computer programs. Communication of common information is accomplished by DIALOG through a dynamically constructed and maintained data base of common information. The unique feature of the DIALOG Executive System is the manner in which computer programs are linked. Each program maintains its individual identity and as such is unaware of its contribution to the large scale program. This feature makes any computer program a candidate for use with the DIALOG Executive System. The installation and use of the DIALOG Executive System are described at Johnson Space Center.

  13. Organizational Change Management For Health Equity: Perspectives From The Disparities Leadership Program.

    PubMed

    Betancourt, Joseph R; Tan-McGrory, Aswita; Kenst, Karey S; Phan, Thuy Hoai; Lopez, Lenny

    2017-06-01

    Leaders of health care organizations need to be prepared to improve quality and achieve equity in today's health care environment characterized by a focus on achieving value and addressing disparities in a diverse population. To help address this need, the Disparities Solutions Center at Massachusetts General Hospital launched the Disparities Leadership Program in 2007. The leadership program is an ongoing, year-long, executive education initiative that trains leaders from hospitals, health plans, and health centers to improve quality and eliminate racial and ethnic disparities in health care. Feedback from participating organizations demonstrates that health care leaders seem to possess knowledge about what disparities are and about what should be done to eliminate them. Data collection, performance measurement, and multifaceted interventions remain the tools of the trade. However, the barriers to success are lack of leadership buy-in, organizational prioritization, energy, and execution, which can be addressed through organizational change management strategies. Project HOPE—The People-to-People Health Foundation, Inc.

  14. Technology for the Future: In-Space Technology Experiments Program, part 1

    NASA Technical Reports Server (NTRS)

    Breckenridge, Roger A. (Compiler); Clark, Lenwood G. (Compiler); Willshire, Kelli F. (Compiler); Beck, Sherwin M. (Compiler); Collier, Lisa D. (Compiler)

    1991-01-01

    The purpose of the Office of Aeronautics and Space Technology (OAST) In-Space Technology Experiment Program (In-STEP) 1988 Workshop was to identify and prioritize technologies that are critical for future national space programs and require validation in the space environment, and review current NASA (In-Reach) and industry/university (Out-Reach) experiments. A prioritized list of the critical technology needs was developed for the following eight disciplines: structures; environmental effects; power systems and thermal management; fluid management and propulsion systems; automation and robotics; sensors and information systems; in-space systems; and humans in space. This is part one of two parts and is the executive summary and experiment description. The executive summary portion contains keynote addresses, strategic planning information, and the critical technology needs summaries for each theme. The experiment description portion contains brief overviews of the objectives, technology needs and backgrounds, descriptions, and development schedules for current industry, university, and NASA space flight technology experiments.

  15. 5 CFR 430.305 - Planning and communicating performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... 430.305 Section 430.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Managing Senior Executive Performance § 430.305 Planning and communicating... strategic planning initiatives. Critical elements and performance requirements for each senior executive...

  16. 5 CFR 430.305 - Planning and communicating performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... 430.305 Section 430.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Managing Senior Executive Performance § 430.305 Planning and communicating... strategic planning initiatives. Critical elements and performance requirements for each senior executive...

  17. Program for Arctic Regional Climate Assessment (PARCA)

    NASA Technical Reports Server (NTRS)

    Gogineni, Sivaprasad; Thomas, Robert H.; Abdalati, Waleed (Editor)

    1999-01-01

    The Program for Arctic Regional Climate Assessment (PARCA) is a NASA-sponsored initiative with the prime objective of understanding the mass balance of the Greenland ice sheet. In October 1998, PARCA investigators met to review activities of the previous year, assess the program's progress, and plan future investigations directed at accomplishing that objective. Some exciting results were presented and discussed, including evidence of dramatic thinning of the ice sheet near the southeastern coast. Details of the investigations and many of the accomplishments are given in this report, but major highlights are given in the Executive Summary of the report.

  18. Flight project data book, 1991

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The Office of Space Science and Applications (OSSA) is responsible for planning, directing, executing, and evaluating that part of the overall NASA program that has as its goal the use of the unique characteristics of the space environment to conduct a scientific study of the universe, to solve practical problems on Earth, and to provide the scientific research foundation for expanding human presence beyond Earth into the solar system. OSSA manages the development of NASA's flight instrumentation for space science and applications including free flying spacecraft, Shuttle and Space Station payloads, and the suborbital sounding rockets, balloons, and aircraft programs. A summary is provided of future flight missions, including those approved and currently under development and those which appear in the OSSA strategic plan.

  19. Model-based Executive Control through Reactive Planning for Autonomous Rovers

    NASA Technical Reports Server (NTRS)

    Finzi, Alberto; Ingrand, Felix; Muscettola, Nicola

    2004-01-01

    This paper reports on the design and implementation of a real-time executive for a mobile rover that uses a model-based, declarative approach. The control system is based on the Intelligent Distributed Execution Architecture (IDEA), an approach to planning and execution that provides a unified representational and computational framework for an autonomous agent. The basic hypothesis of IDEA is that a large control system can be structured as a collection of interacting agents, each with the same fundamental structure. We show that planning and real-time response are compatible if the executive minimizes the size of the planning problem. We detail the implementation of this approach on an exploration rover (Gromit an RWI ATRV Junior at NASA Ames) presenting different IDEA controllers of the same domain and comparing them with more classical approaches. We demonstrate that the approach is scalable to complex coordination of functional modules needed for autonomous navigation and exploration.

  20. DIALOG: An executive computer program for linking independent programs

    NASA Technical Reports Server (NTRS)

    Glatt, C. R.; Hague, D. S.; Watson, D. A.

    1973-01-01

    A very large scale computer programming procedure called the DIALOG executive system was developed for the CDC 6000 series computers. The executive computer program, DIALOG, controls the sequence of execution and data management function for a library of independent computer programs. Communication of common information is accomplished by DIALOG through a dynamically constructed and maintained data base of common information. Each computer program maintains its individual identity and is unaware of its contribution to the large scale program. This feature makes any computer program a candidate for use with the DIALOG executive system. The installation and uses of the DIALOG executive system are described.

  1. Summary of NASA-Lewis Research Center solar heating and cooling and wind energy programs

    NASA Technical Reports Server (NTRS)

    Vernon, R. W.

    1975-01-01

    NASA is planning to construct and operate a solar heating and cooling system in conjunction with a new office building being constructed at Langley Research Center. The technology support for this project will be provided by a solar energy program underway at NASA's Lewis Research Center. The solar program at Lewis includes: testing of solar collectors with a solar simulator, outdoor testing of collectors, property measurements of selective and nonselective coatings for solar collectors, and a solar model-systems test loop. NASA-Lewis has been assisting the National Science Foundation and now the Energy Research and Development Administration in planning and executing a national wind energy program. The areas of the wind energy program that are being conducted by Lewis include: design and operation of a 100 kW experimental wind generator, industry-designed and user-operated wind generators in the range of 50 to 3000 kW, and supporting research and technology for large wind energy systems. An overview of these activities is provided.

  2. Kennedy Space Center Director Update

    NASA Image and Video Library

    2014-03-06

    CAPE CANAVERAL, Fla. - Community leaders, business executives, educators, and state and local government leaders were updated on NASA Kennedy Space Center programs and accomplishments during Center Director Bob Cabana’s Center Director Update at the Debus Center at the Kennedy Space Center Visitor Complex in Florida. Attendees talk with Trey Carlson, Kennedy Master Planner, at the Center Planning and Development Directorate, or CPDD, display. In the background is Mario Busacca, chief of CPDD’s Spaceport Planning Office. Attendees talked with Cabana and other senior Kennedy managers and visited displays featuring updates on Kennedy programs and projects, including International Space Station, Commercial Crew, Ground System Development and Operations, Launch Services, Center Planning and Development, Technology, KSC Swamp Works and NASA Education. The morning concluded with a tour of the new Space Shuttle Atlantis exhibit at the visitor complex. For more information, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Daniel Casper

  3. National plan for prevention, early detection, and cancer control in Peru.

    PubMed

    Vallejos, Carlos

    2013-01-01

    Peru currently is executing an ambitious plan for cancer control: its first nationwide program of cancer prevention and cancer control, and the first such program launched in Latin America. The adequate strategies were identified from previous experience developing smaller initiatives and from knowledge of our epidemiology and priorities. The geographic landscape and sociocultural differences, in which inequalities play a significant role in access to quality education and specialized cancer care, are the main challenges to elaborate strategies to diminish our burden of advanced disease. Challenges were not only identified for the poorest people, but for other sectors of the population. With a growing Peruvian economy in a globalized market context, emerging sectors are being exposed to new risk factors for cancer and educational strategies were implemented. The development of the National Plan for Cancer Control was launched involving not only technical efforts by a multidisciplinary team, but also political concertation.

  4. CASPER Version 2.0

    NASA Technical Reports Server (NTRS)

    Chien, Steve; Rabideau, Gregg; Tran, Daniel; Knight, Russell; Chouinard, Caroline; Estlin, Tara; Gaines, Daniel; Clement, Bradley; Barrett, Anthony

    2007-01-01

    CASPER is designed to perform automated planning of interdependent activities within a system subject to requirements, constraints, and limitations on resources. In contradistinction to the traditional concept of batch planning followed by execution, CASPER implements a concept of continuous planning and replanning in response to unanticipated changes (including failures), integrated with execution. Improvements over other, similar software that have been incorporated into CASPER version 2.0 include an enhanced executable interface to facilitate integration with a wide range of execution software systems and supporting software libraries; features to support execution while reasoning about urgency, importance, and impending deadlines; features that enable accommodation to a wide range of computing environments that include various central processing units and random- access-memory capacities; and improved generic time-server and time-control features.

  5. Succession planning: a call to action for nurse executives.

    PubMed

    Trepanier, Sylvain; Crenshaw, Jeannette T

    2013-10-01

    To discuss the organisational benefits of strategic succession planning in acute care hospital settings as a responsibility of chief nurse executives. A formal succession planning process is crucial to the financial and operational viability and sustainability of acute care hospitals. A succession plan is an essential business strategy that promotes effective leadership transition and continuity while maintaining productivity. Nursing and business literature were reviewed; reports contrasting institutions with and without succession plans were examined; and, operational implications were considered. It is imperative that chief nurse executives respond to the business benefits of an effective succession planning programme, identify common barriers and solutions, and implement best practices for a successful strategic succession planning programme. A strategic succession planning programme may offer many benefits to an acute care hospital, including improved retention rates, increased staff engagement and enhanced financial performance. Considering the ageing nursing workforce and the potential increase in demand for nursing services in the near future, nurse executives and other nurse leaders must actively engage in a formal succession planning process. A formal succession planning programme will help to provide strategic leadership continuity, operational effectiveness and improved quality of care. © 2013 John Wiley & Sons Ltd.

  6. A Test of Motor (Not Executive) Planning in Developmental Coordination Disorder and Autism

    ERIC Educational Resources Information Center

    van Swieten, Lisa M.; van Bergen, Elsje; Williams, Justin H. G.; Wilson, Andrew D.; Plumb, Mandy S.; Kent, Samuel W.; Mon-Williams, Mark A.

    2010-01-01

    Grip selection tasks have been used to test "planning" in both autism and developmental coordination disorder (DCD). We differentiate between "motor" and "executive" planning and present a modified motor planning task. Participants grasped a cylinder in 1 of 2 orientations before turning it clockwise or anticlockwise.…

  7. Optical Testing and Verification Methods for the James Webb Space Telescope Integrated Science Instrument Module Element

    NASA Technical Reports Server (NTRS)

    Antonille, Scott R.; Miskey, Cherie L.; Ohl, Raymond G.; Rohrbach, Scott O.; Aronstein, David L.; Bartoszyk, Andrew E.; Bowers, Charles W.; Cofie, Emmanuel; Collins, Nicholas R.; Comber, Brian J.; hide

    2016-01-01

    NASA's James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (40K). The JWST Observatory includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM) that contains four science instruments (SI) and the fine guider. The SIs are mounted to a composite metering structure. The SI and guider units were integrated to the ISIM structure and optically tested at the NASA Goddard Space Flight Center as a suite using the Optical Telescope Element SIMulator (OSIM). OSIM is a full field, cryogenic JWST telescope simulator. SI performance, including alignment and wave front error, were evaluated using OSIM. We describe test and analysis methods for optical performance verification of the ISIM Element, with an emphasis on the processes used to plan and execute the test. The complexity of ISIM and OSIM drove us to develop a software tool for test planning that allows for configuration control of observations, associated scripts, and management of hardware and software limits and constraints, as well as tools for rapid data evaluation, and flexible re-planning in response to the unexpected. As examples of our test and analysis approach, we discuss how factors such as the ground test thermal environment are compensated in alignment. We describe how these innovative methods for test planning and execution and post-test analysis were instrumental in the verification program for the ISIM element, with enough information to allow the reader to consider these innovations and lessons learned in this successful effort in their future testing for other programs.

  8. Optical testing and verification methods for the James Webb Space Telescope Integrated Science Instrument Module element

    NASA Astrophysics Data System (ADS)

    Antonille, Scott R.; Miskey, Cherie L.; Ohl, Raymond G.; Rohrbach, Scott O.; Aronstein, David L.; Bartoszyk, Andrew E.; Bowers, Charles W.; Cofie, Emmanuel; Collins, Nicholas R.; Comber, Brian J.; Eichhorn, William L.; Glasse, Alistair C.; Gracey, Renee; Hartig, George F.; Howard, Joseph M.; Kelly, Douglas M.; Kimble, Randy A.; Kirk, Jeffrey R.; Kubalak, David A.; Landsman, Wayne B.; Lindler, Don J.; Malumuth, Eliot M.; Maszkiewicz, Michael; Rieke, Marcia J.; Rowlands, Neil; Sabatke, Derek S.; Smith, Corbett T.; Smith, J. Scott; Sullivan, Joseph F.; Telfer, Randal C.; Te Plate, Maurice; Vila, M. Begoña.; Warner, Gerry D.; Wright, David; Wright, Raymond H.; Zhou, Julia; Zielinski, Thomas P.

    2016-09-01

    NASA's James Webb Space Telescope (JWST) is a 6.5m diameter, segmented, deployable telescope for cryogenic IR space astronomy. The JWST Observatory includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM), that contains four science instruments (SI) and the Fine Guidance Sensor (FGS). The SIs are mounted to a composite metering structure. The SIs and FGS were integrated to the ISIM structure and optically tested at NASA's Goddard Space Flight Center using the Optical Telescope Element SIMulator (OSIM). OSIM is a full-field, cryogenic JWST telescope simulator. SI performance, including alignment and wavefront error, was evaluated using OSIM. We describe test and analysis methods for optical performance verification of the ISIM Element, with an emphasis on the processes used to plan and execute the test. The complexity of ISIM and OSIM drove us to develop a software tool for test planning that allows for configuration control of observations, implementation of associated scripts, and management of hardware and software limits and constraints, as well as tools for rapid data evaluation, and flexible re-planning in response to the unexpected. As examples of our test and analysis approach, we discuss how factors such as the ground test thermal environment are compensated in alignment. We describe how these innovative methods for test planning and execution and post-test analysis were instrumental in the verification program for the ISIM element, with enough information to allow the reader to consider these innovations and lessons learned in this successful effort in their future testing for other programs.

  9. Environmental Management System Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fox, Robert; Thorson, Patrick; Horst, Blair

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and othermore » natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environment will be evaluated. Objectives and targets will be developed (or updated) for each aspect that is determined to have a significant impact. Environmental Management Programs (EMPs) will be prepared (or updated) to document actions necessary for reducing certain environmental impacts. Each EMP will identify responsible parties and associated target deadlines for each action. Quarterly, environmental programs will be reviewed for compliance issues and effectiveness. Annually, an internal assessment will be performed to evaluate the progress of the EMS, and LBNL senior management will review the results. In addition, at least once every 3 years a third-party audit will be performed to validate that the EMS is being implemented according to plan.« less

  10. The Critical Role of the Research Community in Space Weather Planning and Execution

    NASA Astrophysics Data System (ADS)

    Robinson, Robert M.; Behnke, Richard A.; Moretto, Therese

    2018-03-01

    The explosion of interest in space weather in the last 25 years has been due to a confluence of efforts all over the globe, motivated by the recognition that events on the Sun and the consequent conditions in interplanetary space and Earth's magnetosphere, ionosphere, and thermosphere can have serious impacts on vital technological systems. The fundamental research conducted at universities, government laboratories, and in the private sector has led to tremendous improvements in the ability to forecast space weather events and predict their impacts on human technology and health. The mobilization of the research community that made this progress possible was the result of a series of actions taken by the National Science Foundation (NSF) to build a national program aimed at space weather. The path forward for space weather is to build on those successes through continued involvement of the research community and support for programs aimed at strengthening basic research and education in academia, the private sector, and government laboratories. Investments in space weather are most effective when applied at the intersection of research and applications. Thus, to achieve the goals set forth originally by the National Space Weather Program, the research community must be fully engaged in the planning, implementation, and execution of space weather activities, currently being coordinated by the Space Weather Operations, Research, and Mitigation Subcommittee under the National Science and Technology Council.

  11. Des Moines metropolitan area ITS strategic plan : executive summary

    DOT National Transportation Integrated Search

    1997-12-01

    This is an executive summary of a strategic plan for deploying Intelligent Transportation Systems (ITS) technology in the Des Moines metropolitan area. The plan was developed as part of the Des Moines ITS Early Deployment Study (EDS). ITS is the use ...

  12. State survey of medical boards regarding abrupt loss of a prescriber of controlled substances.

    PubMed

    Sera, Leah; Brown, Micke; McPherson, Mary Lynn; Walker, Kathryn A; Klein-Schwartz, Wendy

    The purpose of the study was to evaluate states' experiences with abrupt changes in controlled substances (CS) prescribing, to determine whether states have action plans in place to manage such situations, and describe the components of any such plans. A survey of executive directors of 51 medical boards was conducted to evaluate states' experiences with abrupt changes in CS prescribing, the extent of consumer complaints attributed to these events, and the types of plans in place to manage these situations. Forty-six executive directors of medical boards responded. Twenty boards (43.5 percent) confirmed that their state had experienced abrupt loss of CS providers and 11 (55 percent) of these executive directors indicated that the loss resulted in increased consumer complaints. The majority of executive directors (86 percent) had no action plan. Six executive directors reported some type of action plan or process consisting of regulatory action, patient-provider connection, professional education, patient education, or public notice. Most states do not have operational plans in place. However, a few have key strategies that may be useful in addressing potential problems following abrupt loss of a CS prescriber. State medical boards can play a significant role in the development of comprehensive preparedness plans to mitigate damage from the loss of CS prescribers in the community.

  13. Evaluating the Theory of Executive Dysfunction in Autism

    ERIC Educational Resources Information Center

    Hill, Elisabeth L.

    2004-01-01

    In this paper studies of executive function in autism spectrum disorder are reviewed. Executive function is an umbrella term for functions such as planning, working memory, impulse control, inhibition, and shifting set, as well as for the initiation and monitoring of action. In this review, the focus will be on planning, inhibition, shifting set,…

  14. Spitzer Mission Operation System Planning for IRAC Warm-Instrument Characterization

    NASA Technical Reports Server (NTRS)

    Hunt, Joseph C., Jr.; Sarrel, Marc A.; Mahoney, William A.

    2010-01-01

    This paper will describe how the Spitzer Mission Operations System planned and executed the characterization phase between Spitzer's cryogenic mission and its warm mission. To the largest extend possible, the execution of this phase was done with existing processing and procedures. The modifications that were made were in response to the differences of the characterization phase compared to normal phases before and after. The primary two categories of difference are: unknown date of execution due to uncertainty of knowledge of the date of helium depletion, and the short cycle time for data analysis and re-planning during execution. In addition, all of the planning and design had to be done in parallel with normal operations, and we had to transition smoothly back to normal operations following the transition. This paper will also describe the re-planning we had to do following an anomaly discovered in the first days after helium depletion.

  15. Expected Utility Distributions for Flexible, Contingent Execution

    NASA Technical Reports Server (NTRS)

    Bresina, John L.; Washington, Richard

    2000-01-01

    This paper presents a method for using expected utility distributions in the execution of flexible, contingent plans. A utility distribution maps the possible start times of an action to the expected utility of the plan suffix starting with that action. The contingent plan encodes a tree of possible courses of action and includes flexible temporal constraints and resource constraints. When execution reaches a branch point, the eligible option with the highest expected utility at that point in time is selected. The utility distributions make this selection sensitive to the runtime context, yet still efficient. Our approach uses predictions of action duration uncertainty as well as expectations of resource usage and availability to determine when an action can execute and with what probability. Execution windows and probabilities inevitably change as execution proceeds, but such changes do not invalidate the cached utility distributions, thus, dynamic updating of utility information is minimized.

  16. Age-related differences in the motor planning of a lower leg target matching task.

    PubMed

    Davies, Brenda L; Gehringer, James E; Kurz, Max J

    2015-12-01

    While the development and execution of upper extremity motor plans have been well explored, little is known about how individuals plan and execute rapid, goal-directed motor tasks with the lower extremities. Furthermore, the amount of time needed to integrate the proper amount of visual and proprioceptive feedback before being able to accurately execute a goal-directed movement is not well understood; especially in children. Therefore, the purpose of this study was to initially interrogate how the amount of motor planning time provided to a child before movement execution may influence the preparation and execution of a lower leg goal-directed movement. The results displayed that the amount of pre-movement motor planning time provided may influence the reaction time and accuracy of a goal directed leg movement. All subjects in the study had longer reaction times and less accurate movements when no pre-movement motor planning time was provided. In addition, the children had slower reaction times, slower movements, and less accurate movements than the adults for all the presented targets and motor planning times. These results highlight that children may require more time to successfully plan a goal directed movement with the lower extremity. This suggests that children may potentially have less robust internal models than adults for these types of motor skills. Copyright © 2015 Elsevier B.V. All rights reserved.

  17. Mission Data System Java Edition Version 7

    NASA Technical Reports Server (NTRS)

    Reinholtz, William K.; Wagner, David A.

    2013-01-01

    The Mission Data System framework defines closed-loop control system abstractions from State Analysis including interfaces for state variables, goals, estimators, and controllers that can be adapted to implement a goal-oriented control system. The framework further provides an execution environment that includes a goal scheduler, execution engine, and fault monitor that support the expression of goal network activity plans. Using these frameworks, adapters can build a goal-oriented control system where activity coordination is verified before execution begins (plan time), and continually during execution. Plan failures including violations of safety constraints expressed in the plan can be handled through automatic re-planning. This version optimizes a number of key interfaces and features to minimize dependencies, performance overhead, and improve reliability. Fault diagnosis and real-time projection capabilities are incorporated. This version enhances earlier versions primarily through optimizations and quality improvements that raise the technology readiness level. Goals explicitly constrain system states over explicit time intervals to eliminate ambiguity about intent, as compared to command-oriented control that only implies persistent intent until another command is sent. A goal network scheduling and verification process ensures that all goals in the plan are achievable before starting execution. Goal failures at runtime can be detected (including predicted failures) and handled by adapted response logic. Responses can include plan repairs (try an alternate tactic to achieve the same goal), goal shedding, ignoring the fault, cancelling the plan, or safing the system.

  18. Plan execution monitoring with distributed intelligent agents for battle command

    NASA Astrophysics Data System (ADS)

    Allen, James P.; Barry, Kevin P.; McCormick, John M.; Paul, Ross A.

    2004-07-01

    As military tactics evolve toward execution centric operations the ability to analyze vast amounts of mission relevant data is essential to command and control decision making. To maintain operational tempo and achieve information superiority we have developed Vigilant Advisor, a mobile agent-based distributed Plan Execution Monitoring system. It provides military commanders with continuous contingency monitoring tailored to their preferences while overcoming the network bandwidth problem often associated with traditional remote data querying. This paper presents an overview of Plan Execution Monitoring as well as a detailed view of the Vigilant Advisor system including key features and statistical analysis of resource savings provided by its mobile agent-based approach.

  19. Toward Agent Programs with Circuit Semantics

    NASA Technical Reports Server (NTRS)

    Nilsson, Nils J.

    1992-01-01

    New ideas are presented for computing and organizing actions for autonomous agents in dynamic environments-environments in which the agent's current situation cannot always be accurately discerned and in which the effects of actions cannot always be reliably predicted. The notion of 'circuit semantics' for programs based on 'teleo-reactive trees' is introduced. Program execution builds a combinational circuit which receives sensory inputs and controls actions. These formalisms embody a high degree of inherent conditionality and thus yield programs that are suitably reactive to their environments. At the same time, the actions computed by the programs are guided by the overall goals of the agent. The paper also speculates about how programs using these ideas could be automatically generated by artificial intelligence planning systems and adapted by learning methods.

  20. Assessment of the Office of Security Cooperation-Iraq Mission Capabilities

    DTIC Science & Technology

    2013-09-18

    and report and other activities conducted by the Office of Special Plans & Operations to spo@dodig.mil Defense Hotline, The Pentagon ... Defense for Policy, U.S. Cenh·al Command, Joint Staff, and Defense Security Cooperation Agency responses when preparing the final repmt. Please...of Department of Defense support for executing security cooperation programs in Iraq and whether the Office of Security

  1. Space Station Freedom Utilization Conference: Executive summary

    NASA Technical Reports Server (NTRS)

    1992-01-01

    From August 3-6, 1992, Space Station Freedom Program (SSFP) representatives and prospective Space Station Freedom researchers gathered at the Von Braun Civic Center in Huntsville, Alabama, for NASA's first annual Space Station Freedom (SSF) Utilization Conference. The sessions presented are: (1) overview and research capabilities; (2) research plans and opportunities; (3) life sciences research; (4) technology research; (4) microgravity research and biotechnology; and (5) closing plenary.

  2. Mobility for GCSS-MC through virtual PCs

    DTIC Science & Technology

    2017-06-01

    their productivity. Mobile device access to GCSS-MC would allow Marines to access a required program for their mission using a form of computing ...network throughput applications with a device running on various operating systems with limited computational ability. The use of VPCs leads to a...reduced need for network throughput and faster overall execution. 14. SUBJECT TERMS GCSS-MC, enterprise resource planning, virtual personal computer

  3. Did You Remember to DID

    DTIC Science & Technology

    2010-04-01

    threats (also known as a SWOT analysis) is a very useful method in identifying potential issues, hidden agendas, and competing egos. • Defining a...comprehensive communications plan uses what’s been defined and informs (the second key component to DID) government and con - tractor teams of the essential...program execution strategies. Inform Inform means communicating to internal and external stake- holders what was defined, expected, discovered, con

  4. Marine Corps IT Hardware: A Method for Categorizing and Determining Technology Refreshment Cycles

    DTIC Science & Technology

    2015-06-01

    PPB&E Planning, Programming, Budgeting and Execution xiv ROI return on investment SABRS Standard Accounting, Budgeting and Reporting System...and manage IT assets are the Standard Accounting, Budgeting and Reporting System ( SABRS ), the Total Force Structure Management System (TFSMS), and...Defense Property Accountability System (DPAS). The TFSMS and DPAS systems account for the physical hardware assets, while SABRS accounts for costs

  5. The RITE Approach to Agile Acquisition

    DTIC Science & Technology

    2013-04-01

    SSCPAC. He currently provides project management and technical support to the Global Command and Control System–Joint (GCCS-J) Integrated Imagery and...the Strike Planning and Execution Systems Program Office (PMA-281). Boyce has a Bachelor of Science degree in information systems management and is...has since provided dedicated professional service to the USAF, NAVSUP, and SSCPAC. Roussel has a Bachelor of Science degree in management and a Master

  6. DOD Service Acquisition: Improved Use of Available Data Needed to Better Manage and Forecast Service Contract Requirements

    DTIC Science & Technology

    2016-02-01

    Requirements Report to Congressional Committees February 2016 GAO-16-119 United States Government Accountability Office United States...Government Accountability Office Highlights of GAO-16-119, a report to congressional committees February 2016 DOD SERVICE ACQUISITION Improved... Definitions 12 Figures Figure 1: DOD’s Planning, Programming, Budgeting, and Execution (PPBE) Process for Determining Requirements and Allocating

  7. Army Reserve Capabilities-Based Prioritization Study

    DTIC Science & Technology

    2008-08-15

    regulations and procedural guidance are not sufficient to determine the ‘ground truth’ of Planning, Programming, Budgeting and Execution System (PPBES...list), Department of the Army (DA) and Army Reserve Regulations and DA pamphlets. A-3 c. Why this Study Has Not Yet Been Performed/Funded...Memorandum, Management Decision Packages, 1-N list), Department of the Army (DA) and Army Reserve Regulations and DA pamphlets. b. Initial Assessment

  8. Joint Program Executive Office for Chemical and Biological Defense Strategic Plan FY13-18

    DTIC Science & Technology

    2012-06-01

    strategy calls for a global Biosurveillance network for timely disease surveillance of biological pathogens whether intentionally made or naturally... Biosurveillance . The President and Secretary of Defense provided renewed emphasis on rapidly and efficiently developing and manufacturing effective medical...and Force Protection Solutions to the Whole of Government and the Nation  Provide MCM for pre- and post- radiation exposure application , including

  9. Analysis of Horizontal Integration within the Program Executive Office, Integrated Warfare Systems

    DTIC Science & Technology

    2006-09-01

    intervention approach is likely to be effective at changing social relationships and behaviors. Change occurs at the basis of qualitative social time...four types of planned change interventions deal with organizational structures, processes, beliefs, and social relationships . Kotter’s change stages...effective at changing social relationships which favors the long-term. Since the commanding intervention does not deal with the social aspect

  10. 12 CFR 563b.110 - Who must review my business plan?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Who must review my business plan? 563b.110... business plan? (a) Your chief executive officer and members of the board of directors must review, and at least two-thirds of your board of directors must approve, the business plan. (b) Your chief executive...

  11. Description of the computations and pilot procedures for planning fuel-conservative descents with a small programmable calculator

    NASA Technical Reports Server (NTRS)

    Vicroy, D. D.; Knox, C. E.

    1983-01-01

    A simplified flight management descent algorithm was developed and programmed on a small programmable calculator. It was designed to aid the pilot in planning and executing a fuel conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. The flight management descent algorithm and the vertical performance modeling required for the DC-10 airplane is described.

  12. Kennedy Space Center Director Update

    NASA Image and Video Library

    2014-03-06

    CAPE CANAVERAL, Fla. - Community leaders, business executives, educators, and state and local government leaders were updated on NASA Kennedy Space Center programs and accomplishments during Center Director Bob Cabana’s Center Director Update at the Debus Center at the Kennedy Space Center Visitor Complex in Florida. From left, Scott Thurston, Kennedy deputy of the spacecraft office of the Commercial Crew Program, talks with Scott Colloredo, director of the Center Planning and Development Directorate. Attendees talked with Cabana and other senior Kennedy managers and visited displays featuring updates on Kennedy programs and projects, including International Space Station, Commercial Crew, Ground System Development and Operations, Launch Services, Center Planning and Development, Technology, KSC Swamp Works and NASA Education. The morning concluded with a tour of the new Space Shuttle Atlantis exhibit at the visitor complex. For more information, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Daniel Casper

  13. Education Program for Ph.D. Course to Cultivate Literacy and Competency

    NASA Astrophysics Data System (ADS)

    Yokono, Yasuyuki; Mitsuishi, Mamoru

    The program aims to cultivate internationally competitive young researchers equipped with Fundamental attainment (mathematics, physics, chemistry and biology, and fundamental social sciences) , Specialized knowledge (mechanical dynamics, mechanics of materials, hydrodynamics, thermodynamics, design engineering, manufacturing engineering and material engineering, and bird‧s-eye view knowledge on technology, society and the environment) , Literacy (Language, information literacy, technological literacy and knowledge of the law) and Competency (Creativity, problem identification and solution, planning and execution, self-management, teamwork, leadership, sense of responsibility and sense of duty) to become future leaders in industry and academia.

  14. NASTRAN interfacing modules within the Integrated Analysis Capability (IAC) Program

    NASA Technical Reports Server (NTRS)

    Frisch, H. P.

    1986-01-01

    The IAC program provides the framework required for the development of an extensive multidisciplinary analysis capability. Several NASTRAN related capabilities were developed which can all be expanded in a routine manner to meet in-house unique needs. Plans are to complete the work discussed herein and to provide it to the engineering community through COSMIC. Release is to be after the current IAC Level 2 contract work on the IAC executive system is completed and meshed with the interfacing modules and analysis capabilities under development at the GSFC.

  15. Local Governments (Executive Offices) Sector (NAICS 921110)

    EPA Pesticide Factsheets

    EPA regulatory information for government executive offices, including state implementation plans (SIPs), local emergency planning under EPCRA, drinking water treatment, water supply security, and compliance assistance for boiler & combustion regulations.

  16. 13 CFR 108.320 - Contents of comprehensive business plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Contents of comprehensive business plan. 108.320 Section 108.320 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION NEW MARKETS... Contents of comprehensive business plan. (a) Executive summary. The executive summary must include a...

  17. Independent practice associations: Advantages and disadvantages of an alternative form of physician practice organization.

    PubMed

    Casalino, Lawrence P; Chenven, Norman

    2017-03-01

    Value-based purchasing (VBP) favors provider organizations large enough to accept financial risk and develop care management infrastructure. Independent Practice Associations (IPAs) are a potential alternative for physicians to becoming employed by a hospital or large medical group. But little is known about IPAs. We selected four IPAs that vary in location, structure, and strategy, and conducted interviews with their president and medical director, as well as with a hospital executive and health plan executive familiar with that IPA. The IPAs studied vary in size and sophistication, but overall are performing well and are highly regarded by hospital and health plan executives. IPAs can grow rapidly without the cost of purchasing and operating physician practices and make it possible for physicians to remain independent in their own practices while providing the scale and care management infrastructure to make it possible to succeed in VBP. However, it can be difficult for IPAs to gain cooperation from hundreds to thousands of independent physicians, and the need for capital for growth and care management infrastructure is increasing as VBP becomes more prevalent and more demanding. Some IPAs are succeeding at VBP. As VBP raises the performance bar, IPAs will have to demonstrate that they can achieve results equal to more highly capitalized and tightly structured large medical groups and hospital-owned practices. Physicians should be aware of IPAs as a potential option for participating in VBP. Payers are aware of IPAs; the Medicare ACO program and health insurer ACO programs include many IPAs. Copyright © 2016 Elsevier Inc. All rights reserved.

  18. A study on the utilization of advanced composites in commercial aircraft wing structure: Executive summary

    NASA Technical Reports Server (NTRS)

    Watts, D. J.

    1978-01-01

    The overall wing study objectives are to study and plan the effort by commercial transport aircraft manufacturers to accomplish the transition from current conventional materials and practices to extensive use of advanced composites in wings of aircraft that will enter service in the 1985-1990 time period. Specific wing study objectives are to define the technology and data needed to support an aircraft manufacturer's commitment to utilize composites primary wing structure in future production aircraft and to develop plans for a composite wing technology program which will provide the needed technology and data.

  19. Miras and Janet Mattei

    NASA Astrophysics Data System (ADS)

    Willson, L. A.

    2005-08-01

    Janet Mattei appears among the authors on over 70 papers concerning Mira variables or related classes of red variables. She contributed to the planning or execution of some of the research in this area, but more often appeared as representative for the thousands of AAVSO observers world wide. Janet also helped to start several observational programs concerning particular types of variables, and was involved with the planning and/or data analysis on space missions that observed these stars. In this review I put her contributions, and the AAVSO's contributions while she was Director, into a general context of work in this field.

  20. Machine intelligence and robotics: Report of the NASA study group. Executive summary

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A brief overview of applications of machine intelligence and robotics in the space program is given. These space exploration robots, global service robots to collect data for public service use on soil conditions, sea states, global crop conditions, weather, geology, disasters, etc., from Earth orbit, space industrialization and processing technologies, and construction of large structures in space. Program options for research, advanced development, and implementation of machine intelligence and robot technology for use in program planning are discussed. A vigorous and long-range program to incorporate and keep pace with state of the art developments in computer technology, both in spaceborne and ground-based computer systems is recommended.

  1. CHARACTERIZATION REPORT FOR STRONTIUM TITANATE IN SWSA 7 AND ADJACENT PARCELS IN SUPPORT OF THE NATIONAL PRIORITIES LIST SITE BOUNDARY DEFINITION PROGRAM OAK RIDGE, TENNESSEE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David A. King

    2011-10-10

    The U.S. Department of Energy (DOE) Oak Ridge Office requested support from the Oak Ridge Institute for Science and Education (ORISE) contract to delineate the extent of strontium titanate (SrTiO3) contamination in and around Solid Waste Storage Area (SWSA) 7 as part of the Oak Ridge National Priorities List Site boundary definition program. The study area is presented in Fig. 1.1 relative to the Oak Ridge Reservation (ORR). The investigation was executed according to Sampling and Analysis Plan/Quality Assurance Project Plan (SAP/QAPP) (DOE 2011) to supplement previous investigations noted below and to determine what areas, if any, have been adverselymore » impacted by site operations.« less

  2. 5 CFR 412.202 - Systematic training and development of supervisors, managers, and executives.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... MANAGEMENT CIVIL SERVICE REGULATIONS SUPERVISORY, MANAGEMENT, AND EXECUTIVE DEVELOPMENT Succession Planning... the agencies' succession plans. Agencies also must issue written policies to ensure they: (a) Design...

  3. 5 CFR 412.202 - Systematic training and development of supervisors, managers, and executives.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... MANAGEMENT CIVIL SERVICE REGULATIONS SUPERVISORY, MANAGEMENT, AND EXECUTIVE DEVELOPMENT Succession Planning... the agencies' succession plans. Agencies also must issue written policies to ensure they: (a) Design...

  4. 5 CFR 412.202 - Systematic training and development of supervisors, managers, and executives.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... MANAGEMENT CIVIL SERVICE REGULATIONS SUPERVISORY, MANAGEMENT, AND EXECUTIVE DEVELOPMENT Succession Planning... the agencies' succession plans. Agencies also must issue written policies to ensure they: (a) Design...

  5. 5 CFR 412.202 - Systematic training and development of supervisors, managers, and executives.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... MANAGEMENT CIVIL SERVICE REGULATIONS SUPERVISORY, MANAGEMENT, AND EXECUTIVE DEVELOPMENT Succession Planning... the agencies' succession plans. Agencies also must issue written policies to ensure they: (a) Design...

  6. Integrated Demonstration of Instrument Placement , Robust Execution and Contingent Planning

    NASA Technical Reports Server (NTRS)

    Pedersen, L.; Bualat, M.; Lees, D.; Smith, D. E.; Korsmeyer, David (Technical Monitor); Washington, R.

    2003-01-01

    This paper describes an integrated demonstration of ground-based contingent planning, robust execution and autonomous instrument placement for the efficient exploration of a site by a prototype Mars rover.

  7. The Automated Logistics Element Planning System (ALEPS)

    NASA Technical Reports Server (NTRS)

    Schwaab, Douglas G.

    1992-01-01

    ALEPS, which is being developed to provide the SSF program with a computer system to automate logistics resupply/return cargo load planning and verification, is presented. ALEPS will make it possible to simultaneously optimize both the resupply flight load plan and the return flight reload plan for any of the logistics carriers. In the verification mode ALEPS will support the carrier's flight readiness reviews and control proper execution of the approved plans. It will also support the SSF inventory management system by providing electronic block updates to the inventory database on the cargo arriving at or departing the station aboard a logistics carrier. A prototype drawer packing algorithm is described which is capable of generating solutions for 3D packing of cargo items into a logistics carrier storage accommodation. It is concluded that ALEPS will provide the capability to generate and modify optimized loading plans for the logistics elements fleet.

  8. RE-PLAN: An Extensible Software Architecture to Facilitate Disaster Response Planning

    PubMed Central

    O’Neill, Martin; Mikler, Armin R.; Indrakanti, Saratchandra; Tiwari, Chetan; Jimenez, Tamara

    2014-01-01

    Computational tools are needed to make data-driven disaster mitigation planning accessible to planners and policymakers without the need for programming or GIS expertise. To address this problem, we have created modules to facilitate quantitative analyses pertinent to a variety of different disaster scenarios. These modules, which comprise the REsponse PLan ANalyzer (RE-PLAN) framework, may be used to create tools for specific disaster scenarios that allow planners to harness large amounts of disparate data and execute computational models through a point-and-click interface. Bio-E, a user-friendly tool built using this framework, was designed to develop and analyze the feasibility of ad hoc clinics for treating populations following a biological emergency event. In this article, the design and implementation of the RE-PLAN framework are described, and the functionality of the modules used in the Bio-E biological emergency mitigation tool are demonstrated. PMID:25419503

  9. Understanding the Importance and Practice of Credible Leadership at Program Executive Office Ground Combat Systems (PEO GCS) and Program Executive Office Combat Support and Combat Service Support (PEO CS and CSS)

    DTIC Science & Technology

    2017-03-30

    and Program Executive Office Combat Support and Combat Service Support (PEO CS&CSS) Chad P. Stocker March 30, 2017 Submitted to...to Defense Acquisition University in partial fulfillment of the requirement of the Senior Service College Fellowship CREDIBLE LEADERSHIP AT PEO...of Credible Leadership at Program Executive Office Ground Combat Systems (PEO GCS) and Program Executive Office Combat Support and Combat Service

  10. Evaluation of Crew-Centric Onboard Mission Operations Planning and Execution Tool: Year 2

    NASA Technical Reports Server (NTRS)

    Hillenius, S.; Marquez, J.; Korth, D.; Rosenbaum, M.; Deliz, Ivy; Kanefsky, Bob; Zheng, Jimin

    2018-01-01

    Currently, mission planning for the International Space Station (ISS) is largely affected by ground operators in mission control. The task of creating a week-long mission plan for ISS crew takes dozens of people multiple days to complete, and is often created far in advance of its execution. As such, re-planning or adapting to changing real-time constraints or emergent issues is similarly taxing. As we design for future mission operations concepts to other planets or areas with limited connectivity to Earth, more of these ground-based tasks will need to be handled autonomously by the crew onboard.There is a need for a highly usable (including low training time) tool that enables efficient self-scheduling and execution within a single package. The ISS Program has identified Playbook as a potential option. It already has high crew acceptance as a plan viewer from previous analogs and can now support a crew self-scheduling assessment on ISS or on another mission. The goals of this work, a collaboration between the Human Research Program and the ISS Program, are to inform the design of systems for more autonomous crew operations and provide a platform for research on crew autonomy for future deep space missions. Our second year of the research effort have included new insights on the crew self-scheduling sessions performed by the crew through use on the HERA (Human Exploration Research Analog) and NEEMO (NASA Extreme Environment Mission Operations) analogs. Use on the NEEMO analog involved two self-scheduling strategies where the crew planned and executed two days of EVAs (Extra-Vehicular Activities). On HERA year two represented the first HERA campaign where we were able to perform research tasks. This involved selected flexible activities that the crew could schedule, mock timelines where the crew completed more complex planning exercises, usability evaluation of the crew self-scheduling features, and more insights into the limit of plan complexity that the crew could effectively self-schedule. In parallel we have added in new features and functionality in the Playbook tool based off of our insights from crew self-scheduling in the NASA analogs. In particular this year we have added in the ability for the crew to add, edit, and remove their own activities in the Playbook tool, expanding the type of planning and re-planning possible in the tool and opening up the ability for more free form plan creation. The ability to group and manipulate groups of activities from the plan task list was also added, allowing crew members to add predefined sets of activities onto their mission timeline. In addition we also added a way for crew members to roll back changes in their plan, in order to allow an undo like capability. These features expand and complement the initial self-scheduling features added in year one with the goal of making crew autonomous planning more efficient. As part of this work we have also finished developing the first version of our Playbook Data Analysis Tool, a research tool built to interpret and analyze the unobtrusively collected data obtained during the NASA analog missions through Playbook. This data which includes user click interaction as well as plan change information, through the Playbook Data Analysis Tool, allows us to playback this information as if a video camera was mounted over the crewmember's tablet. While the primary purpose of this tool is to allow usability analysis of crew self-scheduling sessions used on the NASA analog, since the data collected is structured, the tool can automatically derive metrics that would be traditionally tedious to achieve without manual analysis of video playback. We will demonstrate and discuss the ability for future derived metrics to be added to the tool. In addition to the current data and results gathered in year two we will also discuss the preparation and goals of our International Space Station (ISS) onboard technology demonstration with Playbook. This technology demonstration will be preformed as part of the CAST payload starting in late 2016.

  11. Implications of Public Opinion for Space Program Planning, 1980 - 2000

    NASA Technical Reports Server (NTRS)

    Overholt, W.; Wiener, A. J.; Yokelson, D.

    1975-01-01

    The effect of public opinion on future space programs is discussed in terms of direct support, apathy, or opposition, and concern about the tax burden, budgetary pressures, and national priorities. Factors considered include: the salience and visibility of NASA as compared with other issues, the sources of general pressure on the federal budget which could affect NASA, the public's opinions regarding the size and priority of NASA'S budget, the degree to which the executive can exercise leverage over NASA's budget through influencing or disregarding public opinion, the effects of linkages to other issues on space programs, and the public's general attitudes toward the progress of science.

  12. Simultaneous planning of the project scheduling and material procurement problem under the presence of multiple suppliers

    NASA Astrophysics Data System (ADS)

    Tabrizi, Babak H.; Ghaderi, Seyed Farid

    2016-09-01

    Simultaneous planning of project scheduling and material procurement can improve the project execution costs. Hence, the issue has been addressed here by a mixed-integer programming model. The proposed model facilitates the procurement decisions by accounting for a number of suppliers offering a distinctive discount formula from which to purchase the required materials. It is aimed at developing schedules with the best net present value regarding the obtained benefit and costs of the project execution. A genetic algorithm is applied to deal with the problem, in addition to a modified version equipped with a variable neighbourhood search. The underlying factors of the solution methods are calibrated by the Taguchi method to obtain robust solutions. The performance of the aforementioned methods is compared for different problem sizes, in which the utilized local search proved efficient. Finally, a sensitivity analysis is carried out to check the effect of inflation on the objective function value.

  13. MHD technology transfer, integration, and review committee

    NASA Astrophysics Data System (ADS)

    1990-05-01

    As part of Task 8 of the magnetohydrodynamic (MHD) Integrated Topping Cycle (ITC) project, TRW was given the responsibility to organize, charter and co-chair, with the Department of Energy (DOE), an MHD Technology Transfer, Integration and Review Committee (TTIRC). The TTIRC consists of an Executive Committee (EC) which acts as the governing body, and a General Committee (GC), also referred to as the main or full committee, consisting of representatives from the various POC contractors, participating universities and national laboratories, utilities, equipment suppliers, and other potential MHD users or investors. The purpose of the TTIRC is to: (1) review all Proof-of-Concept (POC) projects and schedules in the national MHD program; to assess their compatibility with each other and the first commercial MHD retrofit plant; (2) establish and implement technology transfer formats for users of this technology; (3) identify interfaces, issues, and funding structures directly impacting the success of the commercial retrofit; (4) investigate and identify the manner in which, and by whom, the above should be resolved; and (5) investigate and assess other participation (foreign and domestic) in the U.S. MHD Program. There are seven sections: introduction; Executive Committee and General Committee activity; Committee activities related to technology transfer; ongoing POC integration activities being performed under the auspices of the Executive Committee; recommendations passed on to the DOE by the Executive Committee; Planned activities for the next six months.

  14. A Survey of New Trends in Symbolic Execution for Software Testing and Analysis

    NASA Technical Reports Server (NTRS)

    Pasareanu, Corina S.; Visser, Willem

    2009-01-01

    Symbolic execution is a well-known program analysis technique which represents values of program inputs with symbolic values instead of concrete (initialized) data and executes the program by manipulating program expressions involving the symbolic values. Symbolic execution has been proposed over three decades ago but recently it has found renewed interest in the research community, due in part to the progress in decision procedures, availability of powerful computers and new algorithmic developments. We provide a survey of some of the new research trends in symbolic execution, with particular emphasis on applications to test generation and program analysis. We first describe an approach that handles complex programming constructs such as input data structures, arrays, as well as multi-threading. We follow with a discussion of abstraction techniques that can be used to limit the (possibly infinite) number of symbolic configurations that need to be analyzed for the symbolic execution of looping programs. Furthermore, we describe recent hybrid techniques that combine concrete and symbolic execution to overcome some of the inherent limitations of symbolic execution, such as handling native code or availability of decision procedures for the application domain. Finally, we give a short survey of interesting new applications, such as predictive testing, invariant inference, program repair, analysis of parallel numerical programs and differential symbolic execution.

  15. Two criteria for the selection of assembly plans - Maximizing the flexibility of sequencing the assembly tasks and minimizing the assembly time through parallel execution of assembly tasks

    NASA Technical Reports Server (NTRS)

    Homem De Mello, Luiz S.; Sanderson, Arthur C.

    1991-01-01

    The authors introduce two criteria for the evaluation and selection of assembly plans. The first criterion is to maximize the number of different sequences in which the assembly tasks can be executed. The second criterion is to minimize the total assembly time through simultaneous execution of assembly tasks. An algorithm that performs a heuristic search for the best assembly plan over the AND/OR graph representation of assembly plans is discussed. Admissible heuristics for each of the two criteria introduced are presented. Some implementation issues that affect the computational efficiency are addressed.

  16. Automated Planning Enables Complex Protocols on Liquid-Handling Robots.

    PubMed

    Whitehead, Ellis; Rudolf, Fabian; Kaltenbach, Hans-Michael; Stelling, Jörg

    2018-03-16

    Robotic automation in synthetic biology is especially relevant for liquid handling to facilitate complex experiments. However, research tasks that are not highly standardized are still rarely automated in practice. Two main reasons for this are the substantial investments required to translate molecular biological protocols into robot programs, and the fact that the resulting programs are often too specific to be easily reused and shared. Recent developments of standardized protocols and dedicated programming languages for liquid-handling operations addressed some aspects of ease-of-use and portability of protocols. However, either they focus on simplicity, at the expense of enabling complex protocols, or they entail detailed programming, with corresponding skills and efforts required from the users. To reconcile these trade-offs, we developed Roboliq, a software system that uses artificial intelligence (AI) methods to integrate (i) generic formal, yet intuitive, protocol descriptions, (ii) complete, but usually hidden, programming capabilities, and (iii) user-system interactions to automatically generate executable, optimized robot programs. Roboliq also enables high-level specifications of complex tasks with conditional execution. To demonstrate the system's benefits for experiments that are difficult to perform manually because of their complexity, duration, or time-critical nature, we present three proof-of-principle applications for the reproducible, quantitative characterization of GFP variants.

  17. The Dean as Administrator: Roles, Functions and Attributes. A Compilation of Presentations from the Executive Development Series I: "Have You Ever Thought of Being a Dean?" (1980-1981). Volume I.

    ERIC Educational Resources Information Center

    American Association of Colleges of Nursing, Washington, DC.

    The role and attributes of deans of nursing as administrators of baccalaureate or higher degree programs are considered by six deans who contributed to a continuing education workshop series. In addition to outlining skills and attributes needed by administrators, Elizabeth Grossman examines five basic administrative functions: planning,…

  18. Plan for Moral and Ethical Decision-Making Program of Research

    DTIC Science & Technology

    2007-02-01

    to combatants and non-combatants alike, safely and from great distances (Duty with Honor), including long -range precision weapons, using uninhabited...to the legitimization of any procedures, including extreme actions, such as terrorism or political executions, so long as the mandated end is...person they wanted to be or the role they wanted to enact (actual/own versus ideal/own). They also faced the additional struggle of having strong

  19. From planning to execution to the future: An overview of a concerted effort to enhance biological control in apple, pear, and walnut orchards in the western U.S.

    USDA-ARS?s Scientific Manuscript database

    We embarked on a large project designed to help enhance biological control in apple, pear and walnut orchards in the western U.S., where management programs are in the midst of a transition from older organo-phosphate insecticides to mating disruption and newer reduced risk insecticides. A “pesticid...

  20. 2007 Precision Strike Winter Roundtable - Precision Engagement - Strategic Context for the Long War

    DTIC Science & Technology

    2007-02-01

    but also to import Mercedes - Benzes , pricey cognacs and other luxury items to buy loyalty. Washington fears that North Korea could decide to use its...Cappuccio—Executive Vice President and General Manager, Advanced Development Programs & Strategic Planning, Lockheed Martin Company JOINT INNOVATION ... Innovative Minds Lockheed Martin Aeronautics Company Frank Cappuccio, February 1, 2007 Precision Strike Winter Roundtable “Long Range Strike Weapons” 2Lockheed

  1. An Overnight Success?: Usage Patterns and Demographics of Academic Library Patrons during the Overnight Period from 11 p.m.-8 a.m.

    ERIC Educational Resources Information Center

    Sanders, Mark; Hodges, Chris

    2014-01-01

    During the Fall 2013 semester East Carolina University's main library piloted 24/5 hours of operation by opening on Sunday morning and not closing until Friday night. This article details the planning and execution of the pilot program, as well the findings from the data collected during the overnight period by people-counting cameras and a…

  2. Solar Heating and Cooling of Buildings: Phase 0. Feasibility and Planning Study. Volume 1: Executive Summary. Document No. 74SD419. Final Report.

    ERIC Educational Resources Information Center

    General Electric Co., Philadelphia, PA. Space Div.

    The purpose of this study was to establish the technical and economic feasibility of using solar energy for the heating and cooling of buildings and to provide baseline information for the widespread application of solar energy. The initial step in this program was a study of the technical, economic, societal, legal, and environmental factors…

  3. Installation Restoration Program. Phase 1: Records Search, Sheppard AFB, Texas

    DTIC Science & Technology

    1984-02-01

    Environmental Response, Compensation, and Liability Act (CIERA) of 1980, by Executive Order 12316, and 40 Ci 300 Subpart F (National Contingency Plan). CCLA...hensive Environmental Response, Compensation, and Liability Act of 1980 (CURCLA). A potentially hazardous waste is one which is suspected of being...site for agricultural purposes to prevent food chain contamination. Silvicultural use Restrict the use of the site for silvi- cultural uses (root

  4. Managing the Service Supply Chain in the Department of Defense: Implications for the Program Management Infrastructure

    DTIC Science & Technology

    2007-11-27

    underlying technical problem—perhaps as a syndrome (collection of symptoms ) or perhaps in terms of the underlying mechanism. The medical analogy is...be noted that the procuring contracting officer ( PCO ) at the Major Command headquarters, where the services acquisition was centrally planned and...executed, delegated the contract to the administrative contracting officer at the installation where the contract was administered. Thus, the PCO

  5. 2013 Center for Army Leadership Annual Survey of Army Leadership (CASAL): Main Findings

    DTIC Science & Technology

    2014-04-01

    enhances Esprit de Corps. The Center for Army Profession and Ethic (CAPE) has fielded education and training materials (including doctrine, pamphlets ...videos, brochures , and lesson plans available online) to assist Army leaders in executing this program (The FY14 America’s Army-Our Profession...contribution of warrant officer courses for improving leadership capabilities are not unexpected. However, Department of the Army Pamphlet (DA PAM) 600-3

  6. Real-Time Projection to Verify Plan Success During Execution

    NASA Technical Reports Server (NTRS)

    Wagner, David A.; Dvorak, Daniel L.; Rasmussen, Robert D.; Knight, Russell L.; Morris, John R.; Bennett, Matthew B.; Ingham, Michel D.

    2012-01-01

    The Mission Data System provides a framework for modeling complex systems in terms of system behaviors and goals that express intent. Complex activity plans can be represented as goal networks that express the coordination of goals on different state variables of the system. Real-time projection extends the ability of this system to verify plan achievability (all goals can be satisfied over the entire plan) into the execution domain so that the system is able to continuously re-verify a plan as it is executed, and as the states of the system change in response to goals and the environment. Previous versions were able to detect and respond to goal violations when they actually occur during execution. This new capability enables the prediction of future goal failures; specifically, goals that were previously found to be achievable but are no longer achievable due to unanticipated faults or environmental conditions. Early detection of such situations enables operators or an autonomous fault response capability to deal with the problem at a point that maximizes the available options. For example, this system has been applied to the problem of managing battery energy on a lunar rover as it is used to explore the Moon. Astronauts drive the rover to waypoints and conduct science observations according to a plan that is scheduled and verified to be achievable with the energy resources available. As the astronauts execute this plan, the system uses this new capability to continuously re-verify the plan as energy is consumed to ensure that the battery will never be depleted below safe levels across the entire plan.

  7. Robustness via Run-Time Adaptation of Contingent Plans

    NASA Technical Reports Server (NTRS)

    Bresina, John L.; Washington, Richard; Norvig, Peter (Technical Monitor)

    2000-01-01

    In this paper, we discuss our approach to making the behavior of planetary rovers more robust for the purpose of increased productivity. Due to the inherent uncertainty in rover exploration, the traditional approach to rover control is conservative, limiting the autonomous operation of the rover and sacrificing performance for safety. Our objective is to increase the science productivity possible within a single uplink by allowing the rover's behavior to be specified with flexible, contingent plans and by employing dynamic plan adaptation during execution. We have deployed a system exhibiting flexible, contingent execution; this paper concentrates on our ongoing efforts on plan adaptation, Plans can be revised in two ways: plan steps may be deleted, with execution continuing with the plan suffix; and the current plan may be merged with an "alternate plan" from an on-board library. The plan revision action is chosen to maximize the expected utility of the plan. Plan merging and action deletion constitute a more conservative general-purpose planning system; in return, our approach is more efficient and more easily verified, two important criteria for deployed rovers.

  8. Strategic benefits of master facility plans.

    PubMed

    Shannon, K

    1996-02-01

    In recent years, many healthcare executives have stopped developing master facility plans due to some basic misconceptions about them, namely that master facility plans are too rigid or require major capital commitment. By getting past these misconceptions, healthcare executives can help their organizations develop and implement master facility plans that serve as flexible, reliable blueprints in guiding the organizations toward achieving their strategic, operational, and financial goals.

  9. [Effects of planning and executive functions on young children's script change strategy: A developmental perspective].

    PubMed

    Yanaoka, Kaichi

    2016-02-01

    This research examined the effects of planning and executive functions on young children's (ages 3-to 5-years) strategies in changing scripts. Young children (N = 77) performed a script task (doll task), three executive function tasks (DCCS, red/blue task, and nine box task), a planning task, and a receptive vocabulary task. In the doll task, young children first enacted a "changing clothes" script, and then faced a situation in which some elements of the script were inappropriate. They needed to enact a script by compensating inappropriate items for the other-script items or by changing to the other script in advance. The results showed that shifting, a factor of executive function, had a positive influence on whether young children could compensate inappropriate items. In addition, planning was also an important factor that helped children to change to the other script in advance. These findings suggest that shifting and planning play different roles in using the two strategies appropriately when young children enact scripts in unexpected situations.

  10. Combining qualitative and quantitative spatial and temporal information in a hierarchical structure: Approximate reasoning for plan execution monitoring

    NASA Technical Reports Server (NTRS)

    Hoebel, Louis J.

    1993-01-01

    The problem of plan generation (PG) and the problem of plan execution monitoring (PEM), including updating, queries, and resource-bounded replanning, have different reasoning and representation requirements. PEM requires the integration of qualitative and quantitative information. PEM is the receiving of data about the world in which a plan or agent is executing. The problem is to quickly determine the relevance of the data, the consistency of the data with respect to the expected effects, and if execution should continue. Only spatial and temporal aspects of the plan are addressed for relevance in this work. Current temporal reasoning systems are deficient in computational aspects or expressiveness. This work presents a hybrid qualitative and quantitative system that is fully expressive in its assertion language while offering certain computational efficiencies. In order to proceed, methods incorporating approximate reasoning using hierarchies, notions of locality, constraint expansion, and absolute parameters need be used and are shown to be useful for the anytime nature of PEM.

  11. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  12. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  13. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  14. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  15. Proceedings of the 3rd World Congress on Integrated Computational Materials Engineering (ICME 2015). Held in Colorado Springs, CO on May 31-June 4, 2015

    DTIC Science & Technology

    2016-06-28

    Springs, Colorado from May 31- June 4, 2015. ONR support in the an1otmt of$15,000 was provided to support the planning , execution , and dissemination of...held in Colorado Springs, Colorado from May 31- June 4, 2015. ONR support in the amount of $15,000 was provided to support the planning , execution ...support to assist TMS in carrying out the various necessary phases of the planning , execution , and result- dissemination efforts of the Congress. In

  16. Recovering from execution errors in SIPE

    NASA Technical Reports Server (NTRS)

    Wilkins, D. E.

    1987-01-01

    In real-world domains (e.g., a mobile robot environment), things do not always proceed as planned, so it is important to develop better execution-monitoring techniques and replanning capabilities. These capabilities in the SIPE planning system are described. The motivation behind SIPE is to place enough limitations on the representation so that planning can be done efficiently, while retaining sufficient power to still be useful. This work assumes that new information given to the execution monitor is in the form of predicates, thus avoiding the difficult problem of how to generate these predicates from information provided by sensors. The replanning module presented here takes advantage of the rich structure of SIPE plans and is intimately connected with the planner, which can be called as a subroutine. This allows the use of SIPE's capabilities to determine efficiently how unexpected events affect the plan being executed and, in many cases, to retain most of the original plan by making changes in it to avoid problems caused by these unexpected events. SIPE is also capable of shortening the original plan when serendipitous events occur. A general set of replanning actions is presented along with a general replanning capability that has been implemented by using these actions.

  17. An independent race model involving an abort and re-plan strategy explains reach redirecting movements during planning and execution.

    PubMed

    Venkataramani, PrasannaVenkhatesh; Gopal, Atul; Murthy, Aditya

    2018-03-01

    Although race models have been extensively used to study inhibitory control, the mechanisms that enable change of reach plans in the context of race models remain unexplored. We used a redirect task in which targets occasionally changed their locations to study the control of reaching movements during movement planning and execution phases. We tested nine different race model architectures that could explain the redirect behavior of reaching movements. We show that an independent GO-STOP-GO model that reflects a plan-abort-re-plan strategy involving non-interacting elements successfully explained the various behavioral measures such as the compensation function and the pattern of error response reaction times. By extending the same race model to the execution phase, we could explain the extent and the pattern of hypometric trials. Interestingly, the race model also provided evidence that redirecting a movement during planning and execution shared the same inhibitory mechanism. Taken together, this study demonstrates the applicability of an independent race model to understand the computational mechanisms underlying the control of reach movements. © 2018 Federation of European Neuroscience Societies and John Wiley & Sons Ltd.

  18. Planning fuel-conservative descents with or without time constraints using a small programmable calculator: Algorithm development and flight test results

    NASA Technical Reports Server (NTRS)

    Knox, C. E.

    1983-01-01

    A simplified flight-management descent algorithm, programmed on a small programmable calculator, was developed and flight tested. It was designed to aid the pilot in planning and executing a fuel-conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel-conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. The flight-management descent algorithm is described. The results of flight tests flown with a T-39A (Sabreliner) airplane are presented.

  19. Description of the computations and pilot procedures for planning fuel-conservative descents with a small programmable calculator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vicroy, D.D.; Knox, C.E.

    A simplified flight management descent algorithm was developed and programmed on a small programmable calculator. It was designed to aid the pilot in planning and executing a fuel conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. The flight management descent algorithm and the vertical performance modelingmore » required for the DC-10 airplane is described.« less

  20. Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids

    NASA Technical Reports Server (NTRS)

    Marquez, Jessica J.; Pyrzak, Guy; Hashemi, Sam; Ahmed, Samia; McMillin, Kevin Edward; Medwid, Joseph Daniel; Chen, Diana; Hurtle, Esten

    2013-01-01

    Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).

  1. Strategic Audit and Marketing Plan

    ERIC Educational Resources Information Center

    Wright, Lianna S.

    2013-01-01

    The purpose of this audit was to revise the marketing plan for ADSum Professional Development School and give the owner a long-term vision of the school to operate competitively in the crowded field of for-profit schools. It is fairly simple to create a strategic plan but harder to implement and execute. Execution requires weeks and months of…

  2. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and... danger to the environment or health and safety of employees or the public, the Contracting Officer may...

  3. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and... danger to the environment or health and safety of employees or the public, the Contracting Officer may...

  4. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and... danger to the environment or health and safety of employees or the public, the Contracting Officer may...

  5. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and... danger to the environment or health and safety of employees or the public, the Contracting Officer may...

  6. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Integration of environment... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and...

  7. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Integration of environment, safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and...

  8. 76 FR 14840 - Extension of Comment Period: EPA's Plan for Retrospective Review Under Executive Order 13563

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... published in the Federal Register a document seeking public input on the design of a plan to use for periodic retrospective review of its regulations (76 FR 9988). This input is being solicited in response to...] Extension of Comment Period: EPA's Plan for Retrospective Review Under Executive Order 13563 AGENCY...

  9. Directed Incremental Symbolic Execution

    NASA Technical Reports Server (NTRS)

    Person, Suzette; Yang, Guowei; Rungta, Neha; Khurshid, Sarfraz

    2011-01-01

    The last few years have seen a resurgence of interest in the use of symbolic execution -- a program analysis technique developed more than three decades ago to analyze program execution paths. Scaling symbolic execution and other path-sensitive analysis techniques to large systems remains challenging despite recent algorithmic and technological advances. An alternative to solving the problem of scalability is to reduce the scope of the analysis. One approach that is widely studied in the context of regression analysis is to analyze the differences between two related program versions. While such an approach is intuitive in theory, finding efficient and precise ways to identify program differences, and characterize their effects on how the program executes has proved challenging in practice. In this paper, we present Directed Incremental Symbolic Execution (DiSE), a novel technique for detecting and characterizing the effects of program changes. The novelty of DiSE is to combine the efficiencies of static analysis techniques to compute program difference information with the precision of symbolic execution to explore program execution paths and generate path conditions affected by the differences. DiSE is a complementary technique to other reduction or bounding techniques developed to improve symbolic execution. Furthermore, DiSE does not require analysis results to be carried forward as the software evolves -- only the source code for two related program versions is required. A case-study of our implementation of DiSE illustrates its effectiveness at detecting and characterizing the effects of program changes.

  10. Challenges and changes: Immunization program managers share perspectives in a 2012 national survey about the US immunization system since the H1N1 pandemic response

    PubMed Central

    Seib, Katherine; Chamberlain, Allison; Wells, Katelyn; Curran, Eileen; Whitney, Ellen AS; Orenstein, Walter A; Hinman, Alan R; Omer, Saad B

    2014-01-01

    In mid-2012 we conducted survey of immunization program managers (IPMs) for the purpose of describing relationships between immunization programs and emergency preparedness programs, IPM's perceptions of challenges encountered and changes made or planned in programmatic budgeting, vaccine allocation and pandemic plans as a result of the H1N1 vaccination campaign. Over 95% of IPMs responded (61/64) to the survey. IPMs reported that a primary budget-related challenge faced during H1N1 included staff-related restrictions that limited the ability to hire extra help or pay regular staff overtime resulting in overworked regular staff. Other budget-related challenges related to operational budget shortfalls and vaccine procurement delays. IPMs described overcoming these challenges by increasing staff where possible, using executive order or other high-level support by officials to access emergency funds and make policy changes, as well as expedite hiring and spending processes according to their pandemic influenza plan or by direction from leadership. Changes planned for response to future pandemic vaccine allocation strategies were to “tailor the strategy to the event” taking into account disease virulence, vaccine production rates and public demand, having flexible vaccine allocation strategies, clarifying priority groups for vaccine receipt to providers and the public, and having targeted clinics such as through pharmacies or schools. Changes already made to pandemic plans were improving strategies for internal and external communication, improving vaccine allocation efficiency, and planning for specific scenarios. To prepare for future pandemics, programs should ensure well-defined roles, collaborating during non-emergency situations, sustaining continuity in preparedness funding, and improved technologies. PMID:25483633

  11. Motor planning and execution in left- and right-handed individuals during a bimanual grasping and placing task.

    PubMed

    Hughes, Charmayne M L; Reissig, Paola; Seegelke, Christian

    2011-09-01

    The issue of handedness has been the topic of great interest for researchers in a number of scientific domains. It is typically observed that the dominant hand yields numerous behavioral advantages over the non-dominant hand during unimanual tasks, which provides evidence of hemispheric specialization. In contrast to advantages for the dominant hand during motor execution, recent research has demonstrated that the right hand has advantages during motor planning (regardless of handedness), indicating that motor planning is a specialized function of the left hemisphere. In the present study we explored hemispheric advantages in motor planning and execution in left- and right-handed individuals during a bimanual grasping and placing task. Replicating previous findings, both motor planning and execution was influenced by object end-orientation congruency. In addition, although motor planning (i.e., end-state comfort) was not influenced by hand or handedness, motor execution differed between left and right hand, with shorter object transport times observed for the left hand, regardless of handedness. These results demonstrate that the hemispheric advantages often observed in unimanual tasks do not extend to discrete bimanual tasks. We propose that the differences in object transport time between the two hands arise from overt shifting visual fixation between the two hands/objects. Copyright © 2011 Elsevier B.V. All rights reserved.

  12. Advanced space program studies: Overall executive summary

    NASA Technical Reports Server (NTRS)

    Sitney, L. R.

    1974-01-01

    Studies were conducted to provide NASA with advanced planning analyses which relate integrated space program goals and options to credible technical capabilities, applications potential, and funding resources. The studies concentrated on the following subjects: (1) upper stage options for the space transportation system based on payload considerations, (2) space servicing and standardization of payloads, (3) payload operations, and (4) space transportation system economic analyses related to user charges and new space applications. A systems cost/performance model was developed to synthesize automated, unmanned spacecraft configurations based on the system requirements and a list of equipments at the assembly level.

  13. Analysis of Potentially Hazardous Asteroids

    NASA Technical Reports Server (NTRS)

    Arnold, J. O.; Burkhard, C. D.; Dotson, J. L.; Prabhu, D. K.; Mathias, D. L.; Aftosmis, M. J.; Venkatapathy, Ethiraj; Morrison, D. D.; Sears, D. W. G.; Berger, M. J.

    2015-01-01

    The National Aeronautics and Space Administration initiated a new project focused on Planetary Defense on October 1, 2014. The new project is funded by NASAs Near Earth Object Program (Lindley Johnson, Program Executive). This presentation describes the objectives, functions and plans of four tasks encompassed in the new project and their inter-relations. Additionally, this project provides for outreach to facilitate partnerships with other organizations to help meet the objectives of the planetary defense community. The four tasks are (1) Characterization of Near Earth Asteroids, (2) Physics-Based Modeling of Meteor Entry and Breakup (3) Surface Impact Modeling and (4) Physics-Based Impact Risk Assessment.

  14. Distribution automation and control support; Analysis and interpretation of DAC working group results for use in project planning

    NASA Technical Reports Server (NTRS)

    Klock, P.; Evans, D.

    1979-01-01

    The Executive Summary and Proceedings of the Working Group Meeting was analyzed to identify specific projects appropriate for Distribution Automation and Control DAC RD&D. Specific projects that should be undertaken in the DAC RD&D program were recommended. The projects are presented under broad categories of work selected based on ESC's interpretation of the results of the Working Group Meeting. Some of the projects are noted as utility industry projects. The ESC recommendations regarding program management are presented. Utility versus Government management responsibilities are noted.

  15. Gender equality and sustainable human development are key issues.

    PubMed

    Ando, H

    1995-01-01

    In a message to the Indochina Women's Parliamentarians Meeting, Hirofumi Ando, Deputy Executive Director of the United Nations Family Planning Association (UNFPA), encouraged participants to link gender equality and development issues. Ando noted that many of the goals of the 1994 International Conference on Population and Development imply recognition of the need to redress gender inequalities and empower women. The Program of Action adopted in Cairo requires countries to achieve universal access to primary education and reproductive health care services. Parliamentarians in attendance were urged to mobilize the financial resources and political will necessary to implement programs in these areas.

  16. Space-based solar power conversion and delivery systems study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Hazelrigg, G. A., Jr.

    1976-01-01

    The technical and economic aspects of satellite solar power systems are presented with a focus on the current configuration 5000 MW system. The technical studies include analyses of the orbital system structures, control and stationkeeping, and the formulation of program plans and costs for input to the economic analyses. The economic analyses centered about the development and use of a risk analysis model for a system cost assessment, identification of critical issues and technologies, and to provide information for programmatic decision making. A preliminary economic examination of some utility interface issues is included. Under the present state-of-knowledge, it is possible to formulate a program plan for the development of a satellite solar power system that can be economically justified. The key area of technological uncertainty is man's ability to fabricate and assemble large structures in space.

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bretzke, John C.

    The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed tomore » a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.« less

  18. The costs of changing an intended action: movement planning, but not execution, interferes with verbal working memory.

    PubMed

    Spiegel, M A; Koester, D; Weigelt, M; Schack, T

    2012-02-16

    How much cognitive effort does it take to change a movement plan? In previous studies, it has been shown that humans plan and represent actions in advance, but it remains unclear whether or not action planning and verbal working memory share cognitive resources. Using a novel experimental paradigm, we combined in two experiments a grasp-to-place task with a verbal working memory task. Participants planned a placing movement toward one of two target positions and subsequently encoded and maintained visually presented letters. Both experiments revealed that re-planning the intended action reduced letter recall performance; execution time, however, was not influenced by action modifications. The results of Experiment 2 suggest that the action's interference with verbal working memory arose during the planning rather than the execution phase of the movement. Together, our results strongly suggest that movement planning and verbal working memory share common cognitive resources. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.

  19. Onboard Short Term Plan Viewer

    NASA Technical Reports Server (NTRS)

    Hall, Tim; LeBlanc, Troy; Ulman, Brian; McDonald, Aaron; Gramm, Paul; Chang, Li-Min; Keerthi, Suman; Kivlovitz, Dov; Hadlock, Jason

    2011-01-01

    Onboard Short Term Plan Viewer (OSTPV) is a computer program for electronic display of mission plans and timelines, both aboard the International Space Station (ISS) and in ISS ground control stations located in several countries. OSTPV was specifically designed both (1) for use within the limited ISS computing environment and (2) to be compatible with computers used in ground control stations. OSTPV supplants a prior system in which, aboard the ISS, timelines were printed on paper and incorporated into files that also contained other paper documents. Hence, the introduction of OSTPV has both reduced the consumption of resources and saved time in updating plans and timelines. OSTPV accepts, as input, the mission timeline output of a legacy, print-oriented, UNIX-based program called "Consolidated Planning System" and converts the timeline information for display in an interactive, dynamic, Windows Web-based graphical user interface that is used by both the ISS crew and ground control teams in real time. OSTPV enables the ISS crew to electronically indicate execution of timeline steps, launch electronic procedures, and efficiently report to ground control teams on the statuses of ISS activities, all by use of laptop computers aboard the ISS.

  20. Research And Development Contributions to Aviation Progress (RADCAP): Executive summary

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Positive contributions of military aeronautical research and development programs to civil aviation are reviewed and some possible future contributions of those military programs are assessed. A summary is presented of detailed results concerned with: (1) review of the progress that has been made in aviation since 1925 and the significant technological advances that have been made; (2) an examination of current and planned military aeronautical research and technology programs and an assessment of their relevancy to the aeronautical R and D needs of civil aviation; (3) the relationship of the development base generated by military programs to the needs of civil airliner design, development, and production; (4) information on aeronautical R and D funding; and (5) the findings and observations of the RADCAP study.

  1. [Cognitive remediation therapy for children: literature data and clinical application in a child and adolescent psychiatry department].

    PubMed

    Doyen, C; Contejean, Y; Risler, V; Asch, M; Amado, I; Launay, C; Redon, P De Bois; Burnouf, I; Kaye, K

    2015-04-01

    The hypothesis of cerebral plasticity in psychiatric disorders has encouraged clinicians to develop cognitive remediation therapy (CRT), a new therapeutic approach based on attention, memory, planning, and mental flexibility tasks. The first cognitive remediation programs were developed and validated for adults with schizophrenia and were shown to have a positive impact on executive functions as well as on quality of life. In children and adolescents, researchers emphasized the existence of executive dysfunction in neurodevelopmental disorders such as autistic spectrum disorder, attention deficit disorder, and eating disorders. For these disorders, neuropsychological studies suggest that memory, planning, attention and mental flexibility are impaired. Despite the paucity of studies on cognitive remediation (CR) in children, preliminary results have suggested, as in adults with schizophrenia, good compliance and optimization of executive functioning. Consequently, programs dedicated to young subjects were developed in English-speaking countries, and the Department of Child and Adolescent Psychiatry of Sainte Anne Hospital (Paris) developed a new CR program for children with attention deficit disorder, academic problems, or eating disorders. These programs complete the field of CRT proposed by Sainte Anne Hospital's Remediation and Psychosocial Rehabilitation Reference Center, initially designed for adults with schizophrenia. Our team used and adapted validated tools such as Delahunty and Wykes's CRT program (translated and validated in French by Amado and Franck) and Lindvall and Lask's CRT Resource Pack. One program was developed for an adolescent with anorexia nervosa and applied to the subject and her family, but the purpose of this paper is to present a CR approach for children with attention deficit disorder or academic disorder, a 6-month program based on paper-pencil tasks and board and card games. The team was trained in different kinds of cognitive remediation, and the program was applied by a clinical nurse with the supervision of a child and adolescent psychiatrist and the department's neuropsychologists. Paper-pencil tasks were adapted from the CRT program for adults; the card and board games used were geometric figures, illusions, Rush Hour(®), Set(®), Jungle Speed(®), Color Addict(®), etc. These games are available in stores and the program can be applied at home, which helps families set aside their preoccupations with their child's academic performance. Diagnostic and neuropsychological evaluations were done before the beginning of the therapy and repeated at the end of the 6-month program. This program does not ignore the metapsychological impact of the therapy, and work on self-esteem is also done. The presence of the therapist is necessary, which seems better than a computer program, which cannot encourage the young subject in the same personalized and empathetic way. We therefore conducted the first clinical feasibility trial of cognitive remediation in young subjects and present a clinical case of a 6-year-old boy with attention deficit disorder and academic disorder. The results of neuropsychological evaluations before and after therapy suggest improvement in executive functions and better self-esteem. Satisfaction for the boy and his family was high. Even if these results need to be replicated, cognitive remediation appears to be a new therapeutic tool, complementary to classical approaches used in childhood psychiatric disorders. The Department of Child and Adolescent Psychiatry will submit this program to a research program conducted by the National Health Department to study the impact of this approach in a controlled study. Copyright © 2015 Elsevier Masson SAS. All rights reserved.

  2. Automatic vehicle monitoring systems study. Report of phase O. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1977-01-01

    A set of planning guidelines is presented to help law enforcement agencies and vehicle fleet operators decide which automatic vehicle monitoring (AVM) system could best meet their performance requirements. Improvements in emergency response times and resultant cost benefits obtainable with various operational and planned AVM systems may be synthesized and simulated by means of special computer programs for model city parameters applicable to small, medium, and large urban areas. Design characteristics of various AVM systems and the implementation requirements are illustrated and cost estimated for the vehicles, the fixed sites, and the base equipments. Vehicle location accuracies for different RF links and polling intervals are analyzed.

  3. OAST Space Theme Workshop 1976

    NASA Technical Reports Server (NTRS)

    Sadin, S. R.

    1977-01-01

    Papers that provide a technical foundation including research and technology base candidates for each of six space themes - space power, space industrialization, search for extraterrestrial intelligence, exploration of the solar system, global service, and advanced transportation systems - are presented. The material is mainly intended for further use by workshop participants and NASA elements concerned with space research and technology. While the data presented do not represent official plans or positions, they are part of the process of evolving such plans and positions. The information contained reflects the efforts of workshop participants and should be an aid in the successful implementation and execution of the Agency's near- and far-term advanced technology program.

  4. Implications of the Civil Service Reform Act of 1978 on Performance Evaluation in Navy Field Level Activity Comptroller Departments.

    DTIC Science & Technology

    1981-03-01

    application. This was accomplished by the collection and survey of informa- tion regarding the three positions to be studied in this thesis. The...modestly, expand the scope of collective bargaining, including covering many statutory appeals by the negotiated grievance procedure. Employees will have...current inventory of budget plans and program schedules; c. Budget formulation, review and execution; d. Collection of obligation, expenditure, cost, and

  5. Communities’ Strategic Opportunities Through Broken Window Repair and Global Commons Improvements

    DTIC Science & Technology

    2014-06-01

    5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Program Executive Office (Integrated...Warfare Systems),16107 Benedict Court,Woodbridge,VA,22191-4302 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND...identified six priorities, areas of focus: continue to focus on institutional reform; re-evaluate our military’s force planning construct ; preparing for a

  6. A Qualitative Analysis of Navy Funded Graduate Education in Meeting HR Subspecialty Billet Knowledge Requirements

    DTIC Science & Technology

    2012-03-01

    pipeline of the HR community; in-lieu of formal brick and mortar school house training traditionally used by other Navy designator communities. These...Planning, Programming, Budgeting and Execution System QPR Quality Point Rating SECNAV Secretary of the Navy SELRES Selected Reserve SME Subject...Excellence (HRCOE) located at NPS. HR officers earn a master’s degree from among five curriculum disciplines while at NPS. Those disciplines include

  7. Overview of the NASA automation and robotics research program

    NASA Technical Reports Server (NTRS)

    Holcomb, Lee; Larsen, Ron

    1985-01-01

    NASA studies over the last eight years have identified five opportunities for the application of automation and robotics technology: (1) satellite servicing; (2) system monitoring, control, sequencing and diagnosis; (3) space manufacturing; (4) space structure assembly; and (5) planetary rovers. The development of these opportunities entails two technology R&D thrusts: telerobotics and system autonomy; both encompass such concerns as operator interface, task planning and reasoning, control execution, sensing, and systems integration.

  8. EMPTAC (Electromagnetic Pulse Test Aircraft) user's guide

    NASA Astrophysics Data System (ADS)

    Cleaveland, Dale R.; Burkhard, Avery

    1988-04-01

    This guide was established to give test managers a way to familiarize themselves with the Air Force Weapons Laboratory's electromagnetic pulse (EMP) test aircraft program located at Kirtland Air Force Base (KAFB), New Mexico. Brief descriptions of the available EMP test facilities at KAFB are also included. This guide should give prospective customers (users) adequate information to scope the magnitude of their test effort and to accomplish general planning without extensive involvement in test execution details.

  9. Reconfigurable manufacturing execution system for pipe cutting

    NASA Astrophysics Data System (ADS)

    Yin, Y. H.; Xie, J. Y.

    2011-08-01

    This article presents a reconfigurable manufacturing execution system (RMES) filling the gap between enterprise resource planning and resource layer for pipe-cutting production with mass customisation and rapid adaptation to dynamic market, which consists of planning and scheduling layer and executive control layer. Starting from customer's task and process requirements, the cutting trajectories are planned under generalised mathematical model able to reconfigure in accordance with various intersecting types' joint, and all tasks are scheduled by nesting algorithm to maximise the utilisation rate of rough material. This RMES for pipe cutting has been effectively implemented in more than 100 companies.

  10. The Demand and Supply of University-Based Executive Education. GMAC Occasional Papers.

    ERIC Educational Resources Information Center

    Johnson, Terry R.; And Others

    The results of a study of the market for university-based education programs for executives and managers is presented. Study objectives were to profile corporate use of various executive and management education programs, profile characteristics of university-based executive education programs currently offered, and identify trends and unmet needs…

  11. Children's planning performance in the Zoo Map task (BADS-C): Is it driven by general cognitive ability, executive functioning, or prospection?

    PubMed

    Ballhausen, Nicola; Mahy, Caitlin E V; Hering, Alexandra; Voigt, Babett; Schnitzspahn, Katharina M; Lagner, Prune; Ihle, Andreas; Kliegel, Matthias

    2017-01-01

    A minimal amount of research has examined the cognitive predictors of children's performance in naturalistic, errand-type planning tasks such as the Zoo Map task of the Behavioral Assessment of the Dysexecutive Syndrome for Children (BADS-C). Thus, the current study examined prospection (i.e., the ability to remember to carry out a future intention), executive functioning, and intelligence markers as predictors of performance in this widely used naturalistic planning task in 56 children aged 7- to 12-years-old. Measures of planning, prospection, inhibition, crystallized intelligence, and fluid intelligence were collected in an individual differences study. Regression analyses showed that prospection (rather than traditional measures of intelligence or inhibition) predicted planning, suggesting that naturalistic planning tasks such as the Zoo Map task may rely on future-oriented cognitive processes rather than executive problem solving or general knowledge.

  12. Dose tracking and dose auditing in a comprehensive computed tomography dose-reduction program.

    PubMed

    Duong, Phuong-Anh; Little, Brent P

    2014-08-01

    Implementation of a comprehensive computed tomography (CT) radiation dose-reduction program is a complex undertaking, requiring an assessment of baseline doses, an understanding of dose-saving techniques, and an ongoing appraisal of results. We describe the role of dose tracking in planning and executing a dose-reduction program and discuss the use of the American College of Radiology CT Dose Index Registry at our institution. We review the basics of dose-related CT scan parameters, the components of the dose report, and the dose-reduction techniques, showing how an understanding of each technique is important in effective auditing of "outlier" doses identified by dose tracking. Copyright © 2014 Elsevier Inc. All rights reserved.

  13. Report of the Task Force for Improved Coordination of the DoD Science and Technology Program. Volume 2. Reports of the Working Groups. Working Group A: Strategic Planning. Working Group B: Program Coordination. Working Group C: Advocacy

    DTIC Science & Technology

    1988-08-01

    OperabllY 19 Technolofy Area Summaries 20 Major Technology Thrws 21 Air Force S&T Investment Summary 25 Program Objectives 28 Glcazy 30 1. D-6 TH~E...8217lRI-TAC Advrane Plannzn Sy-i Mulima Radio AWAM3 IRP JSTARS fris MmAvne Anhn ABOCC 37=6 Comb !dftica~ S~ Surance Radar Ewm EAVZ SYNC Media . R~u... Social Sciences 5001 Eisenhower Avenue Alexandria VA 22333-5600 Col. Harry G. Dangerfield Telephone: (301) 663-7443 Executive Assistant to the PEO for

  14. The Queued Service Observing Project at CFHT

    NASA Astrophysics Data System (ADS)

    Martin, Pierre; Savalle, Renaud; Vermeulen, Tom; Shapiro, Joshua N.

    2002-12-01

    In order to maximize the scientific productivity of the CFH12K mosaic wide-field imager (and soon MegaCam), the Queued Service Observing (QSO) mode was implemented at the Canada-France-Hawaii Telescope at the beginning of 2001. The QSO system consists of an ensemble of software components allowing for the submission of programs, the preparation of queues, and finally the execution and evaluation of observations. The QSO project is part of a broader system known as the New Observing Process (NOP). This system includes data acquisition, data reduction and analysis through a pipeline named Elixir, and a data archiving and distribution component (DADS). In this paper, we review several technical and operational aspects of the QSO project. In particular, we present our strategy, technical architecture, program submission system, and the tools developed for the preparation and execution of the queues. Our successful experience of over 150 nights of QSO operations is also discussed along with the future plans for queue observing with MegaCam and other instruments at CFHT.

  15. Implementing Earned Value Management in the CxP EVA Systems Project Office

    NASA Technical Reports Server (NTRS)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  16. Urban Operations, Untrained on Terrain.

    DTIC Science & Technology

    1998-06-05

    plans at the unit level, a more flexible organization, and procurement of new equipment. 19980731 069 14. SUBJECT TERMS Urban Terrain, Military...doctrine, a training facility and training plans at the unit level, a more flexible organization, and procurement of new equipment in ACKNOWLEDGMENTS...increased, decentralized execution, these operations must be planned and executed to enable leaders at the lowest levels to seize and exploit the

  17. Early executive function deficit in preterm children and its association with neurodevelopmental disorders in childhood: a literature review.

    PubMed

    Sun, Jing; Buys, Nicholas

    2012-01-01

    The purpose of this study is to examine the association of deficits of executive function (EF) and neurodevelopmental disorders in preterm children and the potential of assessing EF in infants as means of early identification. EF refers to a collection of related but somewhat discrete abilities, the main ones being working memory, inhibition, and planning. There is a general consensus that EF governs goal-directed behavior that requires holding those plans or programs on-line until executed, inhibiting irrelevant action and planning a sequence of actions. EF plays an essential role in cognitive development and is vital to individual social and intellectual success. Most researchers believe in the coordination and integrate cognitive-perceptual processes in relation to time and space, thus regulating higher-order cognitive processes, such as problem solving, reasoning, logical and flexible thinking, and decision-making. The importance of the maturation of the frontal lobe, particularly the prefrontal cortex, to the development of EF in childhood has been emphasized. Therefore, any abnormal development in the prefrontal lobes of infants and children could be expected to result in significant deficits in cognitive functioning. As this is a late-maturing part of the brain, various neurodevelopmental disorders, such as autism spectrum disorders, attention deficit hyperactivity disorder, language disorders, and schizophrenia, as well as acquired disorders of the right brain (and traumatic brain injury) impair EF, and the prefrontal cortex may be particularly susceptible to delayed development in these populations. The deficits of EF in infants are persistent into childhood and related to neurodevelopmental disorders in childhood and adolescence.

  18. Using Executive Information Systems to Manage Capital Projects and Facilities.

    ERIC Educational Resources Information Center

    Kaynor, Robert

    1993-01-01

    In higher education, facilities data are essential for long-term capital and financial planning and for testing assumptions underlying anticipated policy change. Executive information systems should incorporate life-cycle considerations (planning, construction, renovation, and management) and resource linkages (describing interrelationships of…

  19. 20 strategies for marketing your managed care plan.

    PubMed

    Firshein, J

    1996-01-01

    In today's fiercely competitive managed care marketplace, healthcare executives must find a way to set their plans apart from the competition and build a sufficient customer base. At the same time, they must confront a growing anti-managed care backlash among a wary and confused public. Healthcare executive magazine talked with managed care experts to gather their views on key strategies to help executives meet both of these challenges. Here's what they suggest.

  20. 5 CFR 412.302 - Criteria for a Senior Executive Service candidate development program (SESCDP).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Criteria for a Senior Executive Service... MANAGEMENT CIVIL SERVICE REGULATIONS SUPERVISORY, MANAGEMENT, AND EXECUTIVE DEVELOPMENT Senior Executive Service Candidate Development Programs § 412.302 Criteria for a Senior Executive Service candidate...

  1. Delivering Savings with Open Architecture and Product Lines

    DTIC Science & Technology

    2011-04-30

    p.m. Chair: Christopher Deegan , Executive Director, Program Executive Office for Integrated Warfare Systems Delivering Savings with Open...Architectures Walt Scacchi and Thomas Alspaugh, Institute for Software Research Christopher Deegan —Executive Director, Program Executive Officer...Integrated Warfare Systems (PEO IWS). Mr. Deegan directs the development, acquisition, and fleet support of 150 combat weapon system programs managed by 350

  2. Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1975-01-01

    This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

  3. Conceptual design of advanced central receiver power systems sodium-cooled receiver concept. Volume 1. Executive summary. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-06-01

    The conceptual design of an advanced central receiver power system using liquid sodium as a heat transport medium has been completed by a team consisting of the Energy Systems Group (prime contractor), McDonnell Douglas, Stearns-Roger, The University of Houston, and Salt River Project. The purpose of this study was to determine the technical and economic advantages of this concept for commercial-scale power plants. This final report covers all tasks of the project. These tasks were as follows: (1) review and analysis of preliminary specification; (2) parametric analysis; (3) select commercial configuration; (4) commercial plant conceptual design; (5) assessment of commercialmore » plant; (6) advanced central receiver power system development plan; (7) program plan; (8) reports and data; (9) program management; and (10) safety analysis. A programmatic overview of the accomplishments of this program is given. The 100-MW conceptual commercial plant, the 281-MW optimum plant, and the 10-MW pilot plant are described. (WHK)« less

  4. IRQN award paper: Operational rounds: a practical administrative process to improve safety and clinical services in radiology.

    PubMed

    Donnelly, Lane F; Dickerson, Julie M; Lehkamp, Todd W; Gessner, Kevin E; Moskovitz, Jay; Hutchinson, Sally

    2008-11-01

    As part of a patient safety program in the authors' department of radiology, operational rounds have been instituted. This process consists of radiology leaders' visiting imaging divisions at the site of imaging and discussing frontline employees' concerns about patient safety, the quality of care, and patient and family satisfaction. Operational rounds are executed at a time to optimize the number of attendees. Minutes that describe the issues identified, persons responsible for improvement, and updated improvement plan status are available to employees online. Via this process, multiple patient safety and other issues have been identified and remedied. The authors believe that the process has improved patient safety, the quality of care, and the efficiency of operations. Since the inception of the safety program, the mean number of days between serious safety events involving radiology has doubled. The authors review the background around such walk rounds, describe their particular program, and give multiple illustrative examples of issues identified and improvement plans put in place.

  5. Advanced consequence management program: challenges and recent real-world implementations

    NASA Astrophysics Data System (ADS)

    Graser, Tom; Barber, K. S.; Williams, Bob; Saghir, Feras; Henry, Kurt A.

    2002-08-01

    The Enhanced Consequence Management, Planning and Support System (ENCOMPASS) was developed under DARPA's Advanced Consequence Management program to assist decision-makers operating in crisis situations such as terrorist attacks using conventional and unconventional weapons and natural disasters. ENCOMPASS provides the tools for first responders, incident commanders, and officials at all levels to share vital information and consequently, plan and execute a coordinated response to incidents of varying complexity and size. ENCOMPASS offers custom configuration of components with capabilities ranging from map-based situation assessment, situation-based response checklists, casualty tracking, and epidemiological surveillance. Developing and deploying such a comprehensive system posed significant challenges for DARPA program management, due to an inherently complex domain, a broad spectrum of customer sites and skill sets, an often inhospitable runtime environment, demanding development-to-deployment transition requirements, and a technically diverse and geographically distributed development team. This paper introduces ENCOMPASS and explores these challenges, followed by an outline of selected ENCOMPASS deployments, demonstrating how ENCOMPASS can enhance consequence management in a variety real world contexts.

  6. National Geomagnetism Program: Current Status & Five-Year Plan, 2006-2010

    USGS Publications Warehouse

    Love, Jeffrey J.

    2006-01-01

    Executive Summary: The U.S. Geological Survey's Geomagnetism Program serves the scientific community and the broader public by collecting and distributing magnetometer data from an array of ground-based observatories and by conducting scientific analysis on those data. Preliminary, variational time-series can be collected and distributed in near-real time, while fully calibrated, absolute time-series are distributed after processing. The data are used by the civilian and military parts of the Federal Government, by private industry, and by academia, for a wide variety of purposes of both immediately practical importance and long-term scientific interest, including space-weather diagnosis and related hazard mitigation, mapping of the magnetic field and measurement of its activity, and research on the nature of the Earth's interior and the near-Earth space environment. This document reviews the current status of the Program, in terms of its situation within the Government and within the scientific community; summarizes the Program's operations, its staffing situation, and its facilities; describes the diversity of uses of Program magnetometer data; and presents a plan for the next 5 years for enhancing the Program's data-based services, developing products, and conducting scientific research.

  7. Executive Functions and the Improvement of Thinking Abilities: The Intervention in Reading Comprehension

    PubMed Central

    García-Madruga, Juan A.; Gómez-Veiga, Isabel; Vila, José Ó.

    2016-01-01

    In this paper, we propose a preliminary theory of executive functions that address in a specific way their relationship with working memory (WM) and higher-level cognition. It includes: (a) four core on-line WM executive functions that are involved in every novel and complex cognitive task; (b) two higher order off-line executive functions, planning and revision, that are required to resolving the most complex intellectual abilities; and (c) emotional control that is involved in any complex, novel and difficult task. The main assumption is that efficiency on thinking abilities may be improved by specific instruction or training on the executive functions necessary to solving novel and complex tasks involved in these abilities. Evidence for the impact of our training proposal on WM's executive functions involved in higher-level cognitive abilities comes from three studies applying an adaptive program designed to improve reading comprehension in primary school students by boosting the core WM's executive functions involved in it: focusing on relevant information, switching (or shifting) between representations or tasks, connecting incoming information from text with long-term representations, updating of the semantic representation of the text in WM, and inhibition of irrelevant information. The results are consistent with the assumption that cognitive enhancements from the training intervention may have affected not only a specific but also a more domain-general mechanism involved in various executive functions. We discuss some methodological issues in the studies of effects of WM training on reading comprehension. The perspectives and limitations of our approach are finally discussed. PMID:26869961

  8. Planning And Reasoning For A Telerobot

    NASA Technical Reports Server (NTRS)

    Peters, Stephen F.; Mittman, David S.; Collins, Carol E.; O'Meara Callahan, Jacquelyn S.; Rokey, Mark J.

    1992-01-01

    Document discusses research and development of Telerobot Interactive Planning System (TIPS). Goal in development of TIPS is to enable it to accept instructions from operator, then command run-time controller to execute operations to execute instructions. Challenges in transferring technology from testbed to operational system discussed.

  9. Atomicity violation detection using access interleaving invariants

    DOEpatents

    Zhou, Yuanyuan; Lu, Shan; Tucek, Joseph Andrew

    2013-09-10

    During execution of a program, the situation where the atomicity of a pair of instructions that are to be executed atomically is violated is identified, and a bug is detected as occurring in the program at the pair of instructions. The pairs of instructions that are to be executed atomically can be identified in different manners, such as by executing a program multiple times and using the results of those executions to automatically identify the pairs of instructions.

  10. Architecture for Control of the K9 Rover

    NASA Technical Reports Server (NTRS)

    Bresina, John L.; Bualat, maria; Fair, Michael; Wright, Anne; Washington, Richard

    2006-01-01

    Software featuring a multilevel architecture is used to control the hardware on the K9 Rover, which is a mobile robot used in research on robots for scientific exploration and autonomous operation in general. The software consists of five types of modules: Device Drivers - These modules, at the lowest level of the architecture, directly control motors, cameras, data buses, and other hardware devices. Resource Managers - Each of these modules controls several device drivers. Resource managers can be commanded by either a remote operator or the pilot or conditional-executive modules described below. Behaviors and Data Processors - These modules perform computations for such functions as planning paths, avoiding obstacles, visual tracking, and stereoscopy. These modules can be commanded only by the pilot. Pilot - The pilot receives a possibly complex command from the remote operator or the conditional executive, then decomposes the command into (1) more-specific commands to the resource managers and (2) requests for information from the behaviors and data processors. Conditional Executive - This highest-level module interprets a command plan sent by the remote operator, determines whether resources required for execution of the plan are available, monitors execution, and, if necessary, selects an alternate branch of the plan.

  11. On the Evolutionary Origins of Executive Functions

    ERIC Educational Resources Information Center

    Ardila, Alfredo

    2008-01-01

    In this paper it is proposed that the prefrontal lobe participates in two closely related but different executive function abilities: (1) "metacognitive executive functions": problem solving, planning, concept formation, strategy development and implementation, controlling attention, working memory, and the like; that is, executive functions as…

  12. Executive Development: Key Factors for Success.

    ERIC Educational Resources Information Center

    Fenwick-Magrath, Julie A.

    1988-01-01

    Reports results from a survey of 12 leading corporations concerning their management of the executive development process. Indicates that involvement of the chief executive officer, a clear policy, a relationship between executive development and business strategies and objectives, annual succession planning, and management responsibility are key…

  13. Integrated Planning for Telepresence with Time Delays

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Rabe, Kenneth J.

    2006-01-01

    Integrated planning and execution of teleoperations in space with time delays is shown. The topics include: 1) The Problem; 2) Future Robot Surgery? 3) Approach Overview; 4) Robonaut; 5) Normal Planning and Execution; 6) Planner Context; 7) Implementation; 8) Use of JSHOP2; 9) Monitoring and Testing GUI; 10) Normal sequence: first the supervisor acts; 11) then the robot; 12) Robot might be late; 13) Supervisor can work ahead; 14) Deviations from Plan; 15) Robot State Change Example; 16) Accomplished goals skipped in replan; 17) Planning continuity; 18) Supervisor Deviation From Plan; 19) Intentional Deviation; and 20) Infeasible states.

  14. Hazardous Waste Certification Plan: Hazardous Waste Handling Facility, Lawrence Berkeley Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-01

    The purpose of this plan is to describe the organization and methodology for the certification of hazardous waste (HW) handled in the Lawrence Berkeley Laboratory (LBL) Hazardous Waste Handling Facility (HWHF). The plan also incorporates the applicable elements of waste reduction, which include both up-front minimization and end- product treatment to reduce the volume and toxicity of the waste; segregation of the waste as it applies to certification; and executive summary of the Quality Assurance Program Plan (QAPP) for the HWHF and a list of the current and planned implementing procedures used in waste certification. The plan provides guidance frommore » the HWHF to waste generators, waste handlers, and the Systems Group Manager to enable them to conduct their activities and carry out their responsibilities in a manner that complies with several requirements of the Federal Resource Conservation and Resource Recovery Act (RCRA), the Federal Department of Transportation (DOT), and the State of California, Code of Regulations (CCR), Title 22.« less

  15. Effects of physical activity on executive functions, attention and academic performance in preadolescent children: a meta-analysis.

    PubMed

    de Greeff, Johannes W; Bosker, Roel J; Oosterlaan, Jaap; Visscher, Chris; Hartman, E

    2018-05-01

    The aim of this meta-analysis was to provide a systematic review of intervention studies that investigated the effects of physical activity on multiple domains of executive functions, attention and academic performance in preadolescent children (6-12 years of age). In addition, a systematic quantification of the effects of physical activity on these domains is provided. Systematic review and meta-analysis. Searches of electronic databases and examining relevant reviews between 2000 and April 2017 resulted in 31 intervention studies meeting the inclusion criteria. Four subdomains of executive functions (inhibition, working memory, cognitive flexibility and planning), three subdomains of attention (selective, divided and sustained) and three subdomains of academic performance (mathematics, spelling and reading) were distinguished. Effects for different study designs (acute physical activity or longitudinal physical activity programs), type of physical activity (aerobic or cognitively engaging) and duration of intervention were examined separately. Acute physical activity has a positive effect on attention (g=0.43; 95% CI=0.09, 0.77; 6 studies), while longitudinal physical activity programs has a positive effect on executive functions (g=0.24; 95% CI=0.09, 0.39; 12 studies), attention (g=0.90; 95% CI=0.56, 1.24; 1 study) and academic performance (g=0.26; 95% CI=0.02, 0.49; 3 studies). The effects did depend on the subdomain. Positive effects were found for physical activity on executive functions, attention and academic performance in preadolescent children. Largest effects are expected for interventions that aim for continuous regular physical activity over several weeks. Copyright © 2017 Sports Medicine Australia. Published by Elsevier Ltd. All rights reserved.

  16. Advanced space system concepts and their orbital support needs (1980 - 2000). Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Bekey, I.; Mayer, H. L.; Wolfe, M. G.

    1976-01-01

    The likely system concepts which might be representative of NASA and DoD space programs in the 1980-2000 time period were studied along with the programs' likely needs for major space transportation vehicles, orbital support vehicles, and technology developments which could be shared by the military and civilian space establishments in that time period. Such needs could then be used by NASA as an input in determining the nature of its long-range development plan. The approach used was to develop a list of possible space system concepts (initiatives) in parallel with a list of needs based on consideration of the likely environments and goals of the future. The two lists thus obtained represented what could be done, regardless of need; and what should be done, regardless of capability, respectively. A set of development program plans for space application concepts was then assembled, matching needs against capabilities, and the requirements of the space concepts for support vehicles, transportation, and technology were extracted. The process was pursued in parallel for likely military and civilian programs, and the common support needs thus identified.

  17. User's manual for a fuel-conservative descent planning algorithm implemented on a small programmable calculator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vicroy, D.D.

    A simplified flight management descent algorithm was developed and programmed on a small programmable calculator. It was designed to aid the pilot in planning and executing a fuel conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. An explanation and examples of how the algorithm is used,more » as well as a detailed flow chart and listing of the algorithm are contained.« less

  18. Planning fuel-conservative descents with or without time constraints using a small programmable calculator: algorithm development and flight test results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knox, C.E.

    A simplified flight-management descent algorithm, programmed on a small programmable calculator, was developed and flight tested. It was designed to aid the pilot in planning and executing a fuel-conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel-conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. The flight-management descent algorithm is described. The results of flight testsmore » flown with a T-39A (Sabreliner) airplane are presented.« less

  19. Satellite Power Systems (SPS) concept definition study. Volume 6: SPS technology requirements and verification

    NASA Technical Reports Server (NTRS)

    Hanley, G.

    1978-01-01

    Volume 6 of the SPS Concept Definition Study is presented and also incorporates results of NASA/MSFC in-house effort. This volume includes a supporting research and technology summary. Other volumes of the final report that provide additional detail are as follows: (1) Executive Summary; (2) SPS System Requirements; (3) SPS Concept Evolution; (4) SPS Point Design Definition; (5) Transportation and Operations Analysis; and Volume 7, SPS Program Plan and Economic Analysis.

  20. Satellite power systems (SPS) concept definition study. Volume 7: SPS program plan and economic analysis, appendixes

    NASA Technical Reports Server (NTRS)

    Hanley, G.

    1978-01-01

    Three appendixes in support of Volume 7 are contained in this document. The three appendixes are: (1) Satellite Power System Work Breakdown Structure Dictionary; (2) SPS cost Estimating Relationships; and (3) Financial and Operational Concept. Other volumes of the final report that provide additional detail are: Executive Summary; SPS Systems Requirements; SPS Concept Evolution; SPS Point Design Definition; Transportation and Operations Analysis; and SPS Technology Requirements and Verification.

  1. Robust, Multi-layered Plan Execution and Revision for Operation of a Network of Communication Antennas

    NASA Technical Reports Server (NTRS)

    Chien, S. A.; Hill, R. W., Jr.; Govindjee, A.; Wang, X.; Estlin, T.; Griesel, M. A.; Lam, R.; Fayyad, K. V.

    1996-01-01

    This paper describes a hierarchical scheduling, planning, control, and execution monitoring architecture for automating operations of a worldwide network of communications antennas. The purpose of this paper is to describe an architecture for automating the process of capturing spacecraft data.

  2. 16 CFR 1000.18 - Office of Executive Director.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Office of Executive Director. 1000.18... AND FUNCTIONS § 1000.18 Office of Executive Director. The Executive Director with the assistance of... offices: the Office of Financial Management, Planning and Evaluation, the Office of Hazard Identification...

  3. FEASIBILITY STUDY ON EXECUTIVE PROGRAM DEVELOPMENT FOR BASIN ECOSYSTEMS MODELING

    EPA Science Inventory

    The project was undertaken in order to provide a feasibility study in developing and implementing a complete executive program to interface automatically various basin-wide water quality models for use by relatively inexperienced modelers. This executive program should ultimately...

  4. Aeromechanical stability analysis of COPTER

    NASA Technical Reports Server (NTRS)

    Yin, Sheng K.; Yen, Jing G.

    1988-01-01

    A plan was formed for developing a comprehensive, second-generation system with analytical capabilities for predicting performance, loads and vibration, handling qualities, aeromechanical stability, and acoustics. This second-generation system named COPTER (COmprehensive Program for Theoretical Evaluation of Rotorcraft) is designed for operational efficiency, user friendliness, coding readability, maintainability, transportability, modularity, and expandability for future growth. The system is divided into an executive, a data deck validator, and a technology complex. At present a simple executive, the data deck validator, and the aeromechanical stability module of the technology complex were implemented. The system is described briefly, the implementation of the technology module is discussed, and correlation data presented. The correlation includes hingeless-rotor isolated stability, hingeless-rotor ground-resonance stability, and air-resonance stability of an advanced bearingless-rotor in forward flight.

  5. Annual Sustainability Report FY 2014. Incorporates NREL Site Sustainability Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rukavina, Frank

    NREL's Sustainability Program is responsible for upholding all executive orders, federal regulations, U.S. Department of Energy (DOE) orders, and goals related to sustainable and resilient facility operations. But NREL continues to expand sustainable practices above and beyond the laboratory's regulations and requirements to ensure that the laboratory fulfills its mission into the future, leaves the smallest possible legacy footprint, and models sustainable operations and behaviors on national, regional, and local levels. The report, per the GRI reporting format, elaborates on multi-year goals relative to executive orders, achievements, and challenges; and success stories provide specific examples. A section called 'Sustaining NREL'smore » Future Through Integration' provides insight into how NREL is successfully expanding the adoption of renewable energy technologies through integration.« less

  6. NASA Capability Roadmaps Executive Summary

    NASA Technical Reports Server (NTRS)

    Willcoxon, Rita; Thronson, Harley; Varsi, Guilio; Mueller, Robert; Regenie, Victoria; Inman, Tom; Crooke, Julie; Coulter, Dan

    2005-01-01

    This document is the result of eight months of hard work and dedication from NASA, industry, other government agencies, and academic experts from across the nation. It provides a summary of the capabilities necessary to execute the Vision for Space Exploration and the key architecture decisions that drive the direction for those capabilities. This report is being provided to the Exploration Systems Architecture Study (ESAS) team for consideration in development of an architecture approach and investment strategy to support NASA future mission, programs and budget requests. In addition, it will be an excellent reference for NASA's strategic planning. A more detailed set of roadmaps at the technology and sub-capability levels are available on CD. These detailed products include key driving assumptions, capability maturation assessments, and technology and capability development roadmaps.

  7. CPAS Preflight Drop Test Analysis Process

    NASA Technical Reports Server (NTRS)

    Englert, Megan E.; Bledsoe, Kristin J.; Romero, Leah M.

    2015-01-01

    Throughout the Capsule Parachute Assembly System (CPAS) drop test program, the CPAS Analysis Team has developed a simulation and analysis process to support drop test planning and execution. This process includes multiple phases focused on developing test simulations and communicating results to all groups involved in the drop test. CPAS Engineering Development Unit (EDU) series drop test planning begins with the development of a basic operational concept for each test. Trajectory simulation tools include the Flight Analysis and Simulation Tool (FAST) for single bodies, and the Automatic Dynamic Analysis of Mechanical Systems (ADAMS) simulation for the mated vehicle. Results are communicated to the team at the Test Configuration Review (TCR) and Test Readiness Review (TRR), as well as at Analysis Integrated Product Team (IPT) meetings in earlier and intermediate phases of the pre-test planning. The ability to plan and communicate efficiently with rapidly changing objectives and tight schedule constraints is a necessity for safe and successful drop tests.

  8. A Metadata Action Language

    NASA Technical Reports Server (NTRS)

    Golden, Keith; Clancy, Dan (Technical Monitor)

    2001-01-01

    The data management problem comprises data processing and data tracking. Data processing is the creation of new data based on existing data sources. Data tracking consists of storing metadata descriptions of available data. This paper addresses the data management problem by casting it as an AI planning problem. Actions are data-processing commands, plans are dataflow programs and goals are metadata descriptions of desired data products. Data manipulation is simply plan generation and execution, and a key component of data tracking is inferring the effects of an observed plan. We introduce a new action language for data management domains, called ADILM. We discuss the connection between data processing and information integration and show how a language for the latter must be modified to support the former. The paper also discusses information gathering within a data-processing framework, and show how ADILM metadata expressions are a generalization of Local Completeness.

  9. Model-Unified Planning and Execution for Distributed Autonomous System Control

    NASA Technical Reports Server (NTRS)

    Aschwanden, Pascal; Baskaran, Vijay; Bernardini, Sara; Fry, Chuck; Moreno, Maria; Muscettola, Nicola; Plaunt, Chris; Rijsman, David; Tompkins, Paul

    2006-01-01

    The Intelligent Distributed Execution Architecture (IDEA) is a real-time architecture that exploits artificial intelligence planning as the core reasoning engine for interacting autonomous agents. Rather than enforcing separate deliberation and execution layers, IDEA unifies them under a single planning technology. Deliberative and reactive planners reason about and act according to a single representation of the past, present and future domain state. The domain state behaves the rules dictated by a declarative model of the subsystem to be controlled, internal processes of the IDEA controller, and interactions with other agents. We present IDEA concepts - modeling, the IDEA core architecture, the unification of deliberation and reaction under planning - and illustrate its use in a simple example. Finally, we present several real-world applications of IDEA, and compare IDEA to other high-level control approaches.

  10. Development and Execution of End-of-Mission Operations Case Study of the UARS and ERBS End-of-Mission Plans

    NASA Technical Reports Server (NTRS)

    Hughes, John; Marius, Julio L.; Montoro, Manuel; Patel, Mehul; Bludworth, David

    2006-01-01

    This Paper is a case study of the development and execution of the End-of-Mission plans for the Earth Radiation Budget Satellite (ERBS) and the Upper Atmosphere Research Satellite (UARS). The goals of the End-of-Mission Plans are to minimize the time the spacecraft remains on orbit and to minimize the risk of creating orbital debris. Both of these Missions predate the NASA Management Instructions (NMI) that directs missions to provide for safe mission termination. Each spacecrafts had their own unique challenges, which required assessing End-of-Mission requirements versus spacecraft limitations. Ultimately the End-of- Mission operations were about risk mitigation. This paper will describe the operational challenges and the lessons learned executing these End-of-Mission Plans

  11. Tank waste remediation system configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less

  12. 76 FR 20372 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Extension...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... Transaction Exemption 98-54 Relating to Certain Employee Benefit Plan Foreign Exchange Transactions Executed..., ``Prohibited Transaction Exemption 98-54 Relating to Certain Employee Benefit Plan Foreign Exchange Transactions Executed Pursuant to Standing Instructions,'' to the Office of Management and Budget (OMB) for...

  13. Building Software Agents for Planning, Monitoring, and Optimizing Travel

    DTIC Science & Technology

    2004-01-01

    defined as plans in the Theseus Agent Execution language (Barish et al. 2002). In the Web environment, sources can be quite slow and the latencies of...executor is based on a dataflow paradigm, actions are executed as soon as the data becomes available. Second, Theseus performs the actions in a...while Thesues provides an expressive language for defining information gathering and monitoring plans. The Theseus language supports capabilities

  14. A science-based executive for autonomous planetary vehicles

    NASA Technical Reports Server (NTRS)

    Peters, S.

    2001-01-01

    If requests for scientific observations, rather than specific plans, are uplinked to an autonomous execution system on the vehicle, it would be able to adjust its execution based upon actual performance. Such a science-based executive control system had been developed and demonstrated for the Rocky7 research rover.

  15. Advancing Autonomous Operations for Deep Space Vehicles

    NASA Technical Reports Server (NTRS)

    Haddock, Angie T.; Stetson, Howard K.

    2014-01-01

    Starting in Jan 2012, the Advanced Exploration Systems (AES) Autonomous Mission Operations (AMO) Project began to investigate the ability to create and execute "single button" crew initiated autonomous activities [1]. NASA Marshall Space Flight Center (MSFC) designed and built a fluid transfer hardware test-bed to use as a sub-system target for the investigations of intelligent procedures that would command and control a fluid transfer test-bed, would perform self-monitoring during fluid transfers, detect anomalies and faults, isolate the fault and recover the procedures function that was being executed, all without operator intervention. In addition to the development of intelligent procedures, the team is also exploring various methods for autonomous activity execution where a planned timeline of activities are executed autonomously and also the initial analysis of crew procedure development. This paper will detail the development of intelligent procedures for the NASA MSFC Autonomous Fluid Transfer System (AFTS) as well as the autonomous plan execution capabilities being investigated. Manned deep space missions, with extreme communication delays with Earth based assets, presents significant challenges for what the on-board procedure content will encompass as well as the planned execution of the procedures.

  16. Deuteron nuclear data for the design of accelerator-based neutron sources: Measurement, model analysis, evaluation, and application

    NASA Astrophysics Data System (ADS)

    Watanabe, Yukinobu; Kin, Tadahiro; Araki, Shouhei; Nakayama, Shinsuke; Iwamoto, Osamu

    2017-09-01

    A comprehensive research program on deuteron nuclear data motivated by development of accelerator-based neutron sources is being executed. It is composed of measurements of neutron and gamma-ray yields and production cross sections, modelling of deuteron-induced reactions and code development, nuclear data evaluation and benchmark test, and its application to medical radioisotopes production. The goal of this program is to develop a state-of-the-art deuteron nuclear data library up to 200 MeV which will be useful for the design of future (d,xn) neutron sources. The current status and future plan are reviewed.

  17. Integrating planning and reactive control

    NASA Technical Reports Server (NTRS)

    Wilkins, David E.; Myers, Karen L.

    1994-01-01

    Our research is developing persistent agents that can achieve complex tasks in dynamic and uncertain environments. We refer to such agents as taskable, reactive agents. An agent of this type requires a number of capabilities. The ability to execute complex tasks necessitates the use of strategic plans for accomplishing tasks; hence, the agent must be able to synthesize new plans at run time. The dynamic nature of the environment requires that the agent be able to deal with unpredictable changes in its world. As such, agents must be able to react to unanticipated events by taking appropriate actions in a timely manner, while continuing activities that support current goals. The unpredictability of the world could lead to failure of plans generated for individual tasks. Agents must have the ability to recover from failures by adapting their activities to the new situation, or replanning if the world changes sufficiently. Finally, the agent should be able to perform in the face of uncertainty. The Cypress system, described here, provides a framework for creating taskable, reactive agents. Several features distinguish our approach: (1) the generation and execution of complex plans with parallel actions; (2) the integration of goal-driven and event driven activities during execution; (3) the use of evidential reasoning for dealing with uncertainty; and (4) the use of replanning to handle run-time execution problems. Our model for a taskable, reactive agent has two main intelligent components, an executor and a planner. The two components share a library of possible actions that the system can take. The library encompasses a full range of action representations, including plans, planning operators, and executable procedures such as predefined standard operating procedures (SOP's). These three classes of actions span multiple levels of abstraction.

  18. Integrating planning and reactive control

    NASA Astrophysics Data System (ADS)

    Wilkins, David E.; Myers, Karen L.

    1994-10-01

    Our research is developing persistent agents that can achieve complex tasks in dynamic and uncertain environments. We refer to such agents as taskable, reactive agents. An agent of this type requires a number of capabilities. The ability to execute complex tasks necessitates the use of strategic plans for accomplishing tasks; hence, the agent must be able to synthesize new plans at run time. The dynamic nature of the environment requires that the agent be able to deal with unpredictable changes in its world. As such, agents must be able to react to unanticipated events by taking appropriate actions in a timely manner, while continuing activities that support current goals. The unpredictability of the world could lead to failure of plans generated for individual tasks. Agents must have the ability to recover from failures by adapting their activities to the new situation, or replanning if the world changes sufficiently. Finally, the agent should be able to perform in the face of uncertainty. The Cypress system, described here, provides a framework for creating taskable, reactive agents. Several features distinguish our approach: (1) the generation and execution of complex plans with parallel actions; (2) the integration of goal-driven and event driven activities during execution; (3) the use of evidential reasoning for dealing with uncertainty; and (4) the use of replanning to handle run-time execution problems. Our model for a taskable, reactive agent has two main intelligent components, an executor and a planner. The two components share a library of possible actions that the system can take. The library encompasses a full range of action representations, including plans, planning operators, and executable procedures such as predefined standard operating procedures (SOP's). These three classes of actions span multiple levels of abstraction.

  19. On the Information Content of Program Traces

    NASA Technical Reports Server (NTRS)

    Frumkin, Michael; Hood, Robert; Yan, Jerry; Saini, Subhash (Technical Monitor)

    1998-01-01

    Program traces are used for analysis of program performance, memory utilization, and communications as well as for program debugging. The trace contains records of execution events generated by monitoring units inserted into the program. The trace size limits the resolution of execution events and restricts the user's ability to analyze the program execution. We present a study of the information content of program traces and develop a coding scheme which reduces the trace size to the limit given by the trace entropy. We apply the coding to the traces of AIMS instrumented programs executed on the IBM SPA and the SCSI Power Challenge and compare it with other coding methods. Our technique shows size of the trace can be reduced by more than a factor of 5.

  20. CAD/CAM approach to improving industry productivity gathers momentum

    NASA Technical Reports Server (NTRS)

    Fulton, R. E.

    1982-01-01

    Recent results and planning for the NASA/industry Integrated Programs for Aerospace-Vehicle Design (IPAD) program for improving productivity with CAD/CAM methods are outlined. The industrial group work is being mainly done by Boeing, and progress has been made in defining the designer work environment, developing requirements and a preliminary design for a future CAD/CAM system, and developing CAD/CAM technology. The work environment was defined by conducting a detailed study of a reference design process, and key software elements for a CAD/CAM system have been defined, specifically for interactive design or experiment control processes. Further work is proceeding on executive, data management, geometry and graphics, and general utility software, and dynamic aspects of the programs being developed are outlined

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barr, Jonathan L.; Tuffner, Francis K.; Hadley, Mark D.

    This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collectedmore » from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).« less

  2. Application driven interface generation for EASIE. M.S. Thesis

    NASA Technical Reports Server (NTRS)

    Kao, Ya-Chen

    1992-01-01

    The Environment for Application Software Integration and Execution (EASIE) provides a user interface and a set of utility programs which support the rapid integration and execution of analysis programs about a central relational database. EASIE provides users with two basic modes of execution. One of them is a menu-driven execution mode, called Application-Driven Execution (ADE), which provides sufficient guidance to review data, select a menu action item, and execute an application program. The other mode of execution, called Complete Control Execution (CCE), provides an extended executive interface which allows in-depth control of the design process. Currently, the EASIE system is based on alphanumeric techniques only. It is the purpose of this project to extend the flexibility of the EASIE system in the ADE mode by implementing it in a window system. Secondly, a set of utilities will be developed to assist the experienced engineer in the generation of an ADE application.

  3. Planning and Execution for an Autonomous Aerobot

    NASA Technical Reports Server (NTRS)

    Gaines, Daniel M.; Estlin, Tara A.; Schaffer, Steven R.; Chouinard, Caroline M.

    2010-01-01

    The Aerial Onboard Autonomous Science Investigation System (AerOASIS) system provides autonomous planning and execution capabilities for aerial vehicles (see figure). The system is capable of generating high-quality operations plans that integrate observation requests from ground planning teams, as well as opportunistic science events detected onboard the vehicle while respecting mission and resource constraints. AerOASIS allows an airborne planetary exploration vehicle to summarize and prioritize the most scientifically relevant data; identify and select high-value science sites for additional investigation; and dynamically plan, schedule, and monitor the various science activities being performed, even during extended communications blackout periods with Earth.

  4. 7 CFR 1944.409 - Executive Order 12372.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) PROGRAM REGULATIONS (CONTINUED) HOUSING Self-Help Technical Assistance Grants § 1944.409 Executive Order 12372. The self-help program is subject to the provision of Executive Order 12372 which requires... (available in any Agency office), new applicants for the self-help program must submit their Statement of...

  5. Gender and rapid alterations of hemispheric dominance during planning.

    PubMed

    Schuepbach, Daniel; Skotchko, Tatjana; Duschek, Stefan; Theodoridou, Anastasia; Grimm, Simone; Boeker, Heinz; Seifritz, Erich

    2012-01-01

    Mental planning and carrying out a plan provoke specific cerebral hemodynamic responses. Gender aspects of hemispheric laterality using rapid cerebral hemodynamics have not been reported. Here, we applied functional transcranial Doppler sonography to examine lateralization of cerebral hemodynamics of the middle cerebral arteries of 28 subjects (14 women and 14 men) performing a standard planning task. There were easy and difficult problems, and mental planning without motor activity was separated from movement execution. Difficult mental planning elicited lateralization to the right hemisphere after 2 or more seconds, a feature that was not observed during movement execution. In females, there was a dominance to the left hemisphere during movement execution. Optimized problem solving yielded an increased laterality change to the right during mental planning. Gender-related hemispheric dominance appears to be condition-dependent, and change of laterality to the right may play a role in optimized performance. Results are of relevance when considering laterality from a perspective of performance enhancement of higher cognitive functions, and also of psychiatric disorders with cognitive dysfunctions and abnormal lateralization patterns such as schizophrenia. Copyright © 2012 S. Karger AG, Basel.

  6. Stop making plans; start making decisions.

    PubMed

    Mankins, Michael C; Steele, Richard

    2006-01-01

    Many executives have grown skeptical of strategic planning. Is it any wonder? Despite all the time and energy that go into it, strategic planning most often acts as a barrier to good decision making and does little to influence strategy. Strategic planning fails because of two factors: It typically occurs annually, and it focuses on individual business units. As such, the process is completely at odds with the way executives actually make important strategy decisions, which are neither constrained by the calendar nor defined by unit boundaries. Thus, according to a survey of 156 large companies, senior executives often make strategic decisions outside the planning process, in an ad hoc fashion and without rigorous analysis or productive debate. But companies can fix the process if they attack its root problems. A few forward-looking firms have thrown out their calendar-driven, business-unit-focused planning procedures and replaced them with continuous, issues-focused decision making. In doing so, they rely on several basic principles: They separate, but integrate, decision making and plan making. They focus on a few key themes. And they structure strategy reviews to produce real decisions. When companies change the timing and focus of strategic planning, they also change the nature of senior management's discussions about strategy--from "review and approve" to "debate and decide," in which top executives actively think through every major decision and its implications for the company's performance and value. The authors have found that these companies make more than twice as many important strategic decisions per year as companies that follow the traditional planning model.

  7. Environmental restoration and waste management five year plan, fiscal years 1994--1998. Executive summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ``bottom up`` approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE`s commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE`s environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less

  8. Execution monitoring for a mobile robot system

    NASA Technical Reports Server (NTRS)

    Miller, David P.

    1990-01-01

    Due to sensor errors, uncertainty, incomplete knowledge, and a dynamic world, robot plans will not always be executed exactly as planned. This paper describes an implemented robot planning system that enhances the traditional sense-think-act cycle in ways that allow the robot system monitor its behavior and react in emergencies in real-time. A proposal on how robot systems can completely break away from the traditional three-step cycle is also made.

  9. Dealing with large-scale supply lines when introducing new regimens.

    PubMed

    Malati, Christine; Rosenfeld, Joshua; Mowafy, Sherif; Rittmiller, Trevor; Kuritsky, Joel; Crowley, John

    2017-07-01

    As programs plan the introduction of a new antiretroviral as part of a regimen for HIV treatment, supply chain considerations need to be taken into account. The key to success is balancing the introduction of a new regimen with the phasing out of an old regimen in a manner that does not result in either a shortage or an excess supply of either product while ensuring that patients continue receiving their medications. This necessitates that country programs, donors, and procurement entities possess an appreciation of the global antiretroviral market and understand the dynamics that the manufacturing of new antiretrovirals will have on the transition. Supply, demand, and financial considerations affect the capacity of the supply chain to facilitate a successful antiretroviral transition. Although this commentary draws on United States Agency for International Development experiences under the President's Emergency Plan for AIDS Relief from earlier antiretroviral treatment shifts, the approaches are applicable to other institutions and to future transitions. Three approaches were employed: ensuring the engagement of all key stakeholders in transition planning and execution, including clinicians, advocacy groups, supply chain professionals, ministry, and donors; conducting and updating regularly the national quantification and supply plans for all regimens; and introducing antiretroviral products into programs from regional warehouses based on firm orders. Extensive planning and accounting for supply chain factors is essential to ensuring a smooth transition to a new regimen and to enable the global antiretroviral market to respond adequately.

  10. Higher-Performance Executives: Bringing Executive Development Programs Into Balance

    ERIC Educational Resources Information Center

    Gilad, Benjamin; Chussil, Mark

    2013-01-01

    Executive development programs teach various skills deemed important in future leaders and help shape future leadership and its performance. However, they are often excessively focused on competencies required for dealing with internal issues and relationships. They do a much less admirable job preparing future executives for the unique skills…

  11. Functional Magnetic Resonance Imaging during Planning before and after Cognitive-Behavioral Therapy in Pediatric Obsessive-Compulsive Disorder

    ERIC Educational Resources Information Center

    Huyser, Chaim; Veltman, Dick J.; Wolters, Lidewij H.; de Haan, Else; Boer, Frits

    2010-01-01

    Objective: Pediatric obsessive compulsive disorder (OCD) has been associated with cognitive abnormalities, in particular executive impairments, and dysfunction of frontal-striatal-thalamic circuitry. The aim of this study was to investigate if planning as an executive function is compromised in pediatric OCD and is associated with…

  12. A Critical Examination of Senior Executive Leadership Succession Planning and Management with Implications for Underrepresented Minorities

    ERIC Educational Resources Information Center

    Jackson, LeKeisha D.

    2017-01-01

    Guided by the research questions, this study utilized a sequential explanatory mixed methods research design to examine senior executive leadership succession planning at four-year, predominately white, doctoral universities in the state of Georgia. Utilizing the Representative Bureaucracy theory and the Mateso SPM conceptual model, this study…

  13. The Design of an Information Management Program for Headquarters, Department of the Army. Phase 2. Management Summary.

    DTIC Science & Technology

    1980-02-26

    months estimated to be required in some areas), and more direct invol ement of information users in long range planning of information requirements (with...most people, there is a definite need to educate the members of the organization as to the implications of the IRM approach. Emphasis should be placed...from information sharing and a coordinated approach. Such an educational process has already begun with the execution of this study, but more must be

  14. Application of Remote Sensing to the Chesapeake Bay Region. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Chen, W. T.; Freas, G. W., Jr.; Hickman, G. D.; Pemberton, D. A.; Wilkerson, T. D.; Adler, I.; Laurie, V. J.

    1978-01-01

    The proceedings are presented of a conference, jointly sponsored by the National Aeronautics and Space Administration, the U.S. Environmental Protection Agency, and the University of Maryland. The purpose of the Conference was to assemble representatives of federal and state government agencies engaged in research on the condition and evolution of the Chesapeake Bay to compose a status report, to present current activities and future plans, and to recommend a long-range future course of policies and programs.

  15. Space Transportation Avionics Technology Symposium. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The focus of the symposium was to examine existing and planned avionics technology processes and products and to recommend necessary changes for strengthening priorities and program emphases. Innovative changes in avionics technology development and design processes, identified during the symposium, are needed to support the increasingly complex, multi-vehicle, integrated, autonomous space-based systems. Key technology advances make such a major initiative viable at this time: digital processing capabilities, integrated on-board test/checkout methods, easily reconfigurable laboratories, and software design and production techniques.

  16. Articulating the Effects of Infrastructure Resourcing on Air Force Missions: Competing Approaches to Inform the Planning, Programming, Budgeting, and Execution System

    DTIC Science & Technology

    2017-01-01

    aircraft types. Like the project scorecard, well- designed mission outcome metrics are concrete and relatable: sorties generated, pilots graduated...systems are designed to serve functions like this. To the degree that these data can be exported and synthesized, they can be leveraged to tie to a...expectations of engineers who designed a facility, as well as end users who utilize it. A notional depiction of how asset condition changes over

  17. Intelligent Tutoring for Programming Tasks: Using Plan Analysis to Generate Better Hints.

    DTIC Science & Technology

    1982-03-01

    construction and execution of a BASIC proqram that assiqns an integer value to a variable and then prints the value of that integer. - ARTICHOKE : assign...the string " ARTICHOKE " to a string variable, assiqn the value of that variable to a second variable, and print the second variable. -SINOP: qet two...the first five tasks: GREENFLAG, ARTICHOKE , SINOP, NINOP, and TWOS. Because the protocols are very lonq, it was necessary to condense them into a

  18. Defense Logistics: The Department of Defense’s Report on Strategic Seaports Addressed All Congressionally Directed Elements

    DTIC Science & Technology

    2013-05-13

    executes the strategic seaport program for DOD. • MARAD and DOD use Port Planning Orders ( PPOs ) to identify and coordinate DOD’s needs in advance...outline each port’s ability to meet the PPO requirements. • The National Port Readiness Network, chaired by MARAD, provides for the establishment of...However, a key assumption of the report was that the PPO facilities at the strategic seaports provide sufficient capacity to meet the DOD cargo

  19. 2011 Joint Program Executive Office for Chemical and Biological Defense Advance Planning Briefing for Industry (APBI) Held in Baltimore, Maryland on September 7-9, 2011

    DTIC Science & Technology

    2011-09-09

    Chemical and Biological Defense Defense Threat Reduction Agency (DTRA)/Joint Science & Technology Office (JSTO) Dr. Alan Rudolph , Director, Chemical...Mr. Douglas W. Bryce 9:05 am – 9:45 am Dr. Alan Rudolph Director, Chemical and Biological Technologies Directorate, Defense Threat Reduction...Joint Science and Technology Office for Chemical and Biological Defense Dr. Alan S. Rudolph Mr. David K. Grimm Acting Heidi Shyu Joint Combat

  20. Navy Virginia (SSN 774) Class Attack Submarine Procurement: Background and Issues for Congress

    DTIC Science & Technology

    2016-10-25

    proposed plan include the following:  GD/EB is to be the prime contractor for designing and building Ohio replacement boats;  HII/NNS is to be a...boats, and HII/NNS would receive 22%-23%;  GD/EB is to continue as prime contractor for the Virginia-class program, but to help balance out projected...execute this strategy, GDEB has been selected as the prime contractor for OR with the responsibilities to deliver the twelve OR [Ohio replacement

  1. Navy Planning, Programming, Budgeting, and Execution: A Reference Guide for Senior Leaders, Managers, and Action Officers

    DTIC Science & Technology

    2016-01-01

    one- or two-day course to members still trying to learn the abbreviations and acronyms is not an effective way to spend anyone’s time. It takes a...requirements genera- tion process. This guide does not take a position in that debate, but it can offer lessons learned over the past few decades. First...and some lead- ers spend most of their careers learning about just one. But one can be effective sooner and more consistently by remembering and

  2. The Origins of U.S. Space Policy: Eisenhower, Open Skies, and Freedom of Space.

    DTIC Science & Technology

    1992-01-01

    national security, the executive action that shaped this enterprise and the space policy that President Dwight D. Eisenhower and his advisors created for...program, the president’s closest advisors determined, if at all possible, to keep outer space a region open to all, where the spacecraft of any state...83. The NSC Planning Board, also at the president’s direction, in November 1954 had established a net capabilities evaluation subcommittee" that

  3. Autonomous mission management for UAVs using soar intelligent agents

    NASA Astrophysics Data System (ADS)

    Gunetti, Paolo; Thompson, Haydn; Dodd, Tony

    2013-05-01

    State-of-the-art unmanned aerial vehicles (UAVs) are typically able to autonomously execute a pre-planned mission. However, UAVs usually fly in a very dynamic environment which requires dynamic changes to the flight plan; this mission management activity is usually tasked to human supervision. Within this article, a software system that autonomously accomplishes the mission management task for a UAV will be proposed. The system is based on a set of theoretical concepts which allow the description of a flight plan and implemented using a combination of Soar intelligent agents and traditional control techniques. The system is capable of automatically generating and then executing an entire flight plan after being assigned a set of objectives. This article thoroughly describes all system components and then presents the results of tests that were executed using a realistic simulation environment.

  4. Carnegie Mellon University's MMM program: management education for 21st-century physicians.

    PubMed

    Korevaar, W C; Pearson, R W

    2001-01-01

    The number and types of executive and graduate-level management programs for physicians have exploded in recent years. These programs take on a variety of formats, ranging from executive seminars to master's-level degree programs. Options for physicians obtaining the master's degree tend to be either regionally based programs in traditional evening classes or nationally based programs that combine executive education formats with distance education. This paper examines a nationally based program - the Master of Medical Management (MMM) - from the perspectives of an administrator and a graduate of the program. It offers reasons for the growth of similar programs and data from students enrolled in the Carnegie Mellon University MMM program. The paper also examines educational outcomes in the form of behavioral competencies that the physicians acquired in the program. It concludes with reflections on the future of the MMM and related programs for physician executives in the 21st century.

  5. Evaluating Market Orientation of an Executive MBA Program.

    ERIC Educational Resources Information Center

    Dubas, Khalid M.; Ghani, Waqar I.; Davis, Stanley; Strong, James T.

    1998-01-01

    A study assessed the market orientation of the executive Master's in Business Administration (MBA) program at Saint Joseph's University (Pennsylvania) in terms of 12 skills and knowledge areas that reflect effective managerial performance and the student-executives' perceptions of program strengths and weaknesses in delivering these skills.…

  6. Engineering Play: Exploring Associations with Executive Function, Mathematical Ability, and Spatial Ability in Preschool

    NASA Astrophysics Data System (ADS)

    Gold, Zachary Samuel

    Engineering play is a new perspective on preschool education that views constructive play as an engineering design process that parallels the way engineers think and work when they develop engineered solutions to human problems (Bairaktarova, Evangelou, Bagiati, & Brophy, 2011). Early research from this perspective supports its use in framing play as a key learning context. However, no research to date has examined associations between engineering play and other factors linked with early school success, such as executive function, mathematical ability, and spatial ability. Additionally, more research is needed to further validate a new engineering play observational measure. This study had two main goals: (1) to gather early validity data on the engineering play measure as a potentially useful instrument for documenting the occurrence of children's engineering play behaviors in educational contexts, such as block play. This was done by testing the factor structure of the engineering play behaviors in this sample and their association with preschoolers' planning, a key aspect of the engineering design process; (2) to explore associations between preschoolers' engineering play and executive function, mathematical ability, and spatial ability. Participants included 110 preschoolers (62 girls; 48 boys; M = 58.47 months) from 10 classrooms in the Midwest United States coded for their frequency of engagement in each of the nine engineering play behaviors. A confirmatory factor analysis resulted in one engineering play factor including six of the engineering play behaviors. A series of marginal regression models revealed that the engineering play factor was significantly and positively associated with the spatial horizontal rotation transformation. However, engineering play was not significantly related to planning ability, executive function, informal mathematical abilities, or other spatial transformation skills. Follow-up analyses revealed significant positive associations between engineering play and planning, executive function, and geometry for only a subgroup of children (n = 27) who had individualized education program (IEP) status. This was the first of a series of studies planned to evaluate the potential of the engineering play perspective as a tool for understanding young children's development and learning across multiple developmental domains. Although most hypotheses regarding engineering play and cognitive skills were not supported, the study provided partial evidence for the reliability and validity of the engineering play observation measure. Future research should include larger sample sizes with more statistical power, continued refinement of the engineering play observation measure, examination of potential associations with specific early learning domains, including spatial ability and language, and more comparisons of engineering play between typically developing children and children with disabilities.

  7. Patient Autonomy for the Management of Chronic Conditions: A Two-Component Re-conceptualization

    PubMed Central

    Naik, Aanand D.; Dyer, Carmel B.; Kunik, Mark E.; McCullough, Laurence B.

    2010-01-01

    The clinical application of the concept of patient autonomy has centered on the ability to deliberate and make treatment decisions (decisional autonomy) to the virtual exclusion of the capacity to execute the treatment plan (executive autonomy). However, the one-component concept of autonomy is problematic in the context of multiple chronic conditions. Adherence to complex treatments commonly breaks down when patients have functional, educational, and cognitive barriers that impair their capacity to plan, sequence, and carry out tasks associated with chronic care. The purpose of this article is to call for a two-component re-conceptualization of autonomy and to argue that the clinical assessment of capacity for patients with chronic conditions should be expanded to include both autonomous decision making and autonomous execution of the agreed-upon treatment plan. We explain how the concept of autonomy should be expanded to include both decisional and executive autonomy, describe the biopsychosocial correlates of the two-component concept of autonomy, and recommend diagnostic and treatment strategies to support patients with deficits in executive autonomy. PMID:19180389

  8. Geographic Information System Technology Leveraged for Crisis Planning, Emergency, Response, and Disaster Management

    NASA Astrophysics Data System (ADS)

    Ross, A.; Little, M. M.

    2013-12-01

    NASA's Atmospheric Science Data Center (ASDC) is piloting the use of Geographic Information System (GIS) technology that can be leveraged for crisis planning, emergency response, and disaster management/awareness. Many different organizations currently use GIS tools and geospatial data during a disaster event. ASDC datasets have not been fully utilized by this community in the past due to incompatible data formats that ASDC holdings are archived in. Through the successful implementation of this pilot effort and continued collaboration with the larger Homeland Defense and Department of Defense emergency management community through the Homeland Infrastructure Foundation-Level Data Working Group (HIFLD WG), our data will be easily accessible to those using GIS and increase the ability to plan, respond, manage, and provide awareness during disasters. The HIFLD WG Partnership has expanded to include more than 5,900 mission partners representing the 14 executive departments, 98 agencies, 50 states (and 3 territories), and more than 700 private sector organizations to directly enhance the federal, state, and local government's ability to support domestic infrastructure data gathering, sharing and protection, visualization, and spatial knowledge management.The HIFLD WG Executive Membership is lead by representatives from the Department of Defense (DoD) Office of the Assistant Secretary of Defense for Homeland Defense and Americas' Security Affairs - OASD (HD&ASA); the Department of Homeland Security (DHS), National Protection and Programs Directorate's Office of Infrastructure Protection (NPPD IP); the National Geospatial-Intelligence Agency (NGA) Integrated Working Group - Readiness, Response and Recovery (IWG-R3); the Department of Interior (DOI) United States Geological Survey (USGS) National Geospatial Program (NGP), and DHS Federal Emergency Management Agency (FEMA).

  9. Integrated Extravehicular Activity Human Research Plan: 2017

    NASA Technical Reports Server (NTRS)

    Abercromby, Andrew

    2017-01-01

    Multiple organizations within NASA as well as industry and academia fund and participate in research related to extravehicular activity (EVA). In October 2015, representatives of the EVA Office, the Crew and Thermal Systems Division (CTSD), and the Human Research Program (HRP) at NASA Johnson Space Center agreed on a formal framework to improve multi-year coordination and collaboration in EVA research. At the core of the framework is an Integrated EVA Human Research Plan and a process by which it will be annually reviewed and updated. The over-arching objective of the collaborative framework is to conduct multi-disciplinary cost-effective research that will enable humans to perform EVAs safely, effectively, comfortably, and efficiently, as needed to enable and enhance human space exploration missions. Research activities must be defined, prioritized, planned and executed to comprehensively address the right questions, avoid duplication, leverage other complementary activities where possible, and ultimately provide actionable evidence-based results in time to inform subsequent tests, developments and/or research activities. Representation of all appropriate stakeholders in the definition, prioritization, planning and execution of research activities is essential to accomplishing the over-arching objective. A formal review of the Integrated EVA Human Research Plan will be conducted annually. Coordination with stakeholders outside of the EVA Office, CTSD, and HRP is already in effect on a study-by-study basis; closer coordination on multi-year planning with other EVA stakeholders including academia is being actively pursued. Details of the preliminary Integrated EVA Human Research Plan are presented including description of ongoing and planned research activities in the areas of: physiological and performance capabilities; suit design parameters; EVA human health and performance modeling; EVA tasks and concepts of operations; EVA informatics; human-suit sensors; suit sizing and fit; and EVA injury risk and mitigation. This paper represents the 2017 update to the Integrated EVA Human Research Plan.

  10. Investigating executive functions in children with severe speech and movement disorders using structured tasks.

    PubMed

    Stadskleiv, Kristine; von Tetzchner, Stephen; Batorowicz, Beata; van Balkom, Hans; Dahlgren-Sandberg, Annika; Renner, Gregor

    2014-01-01

    Executive functions are the basis for goal-directed activity and include planning, monitoring, and inhibition, and language seems to play a role in the development of these functions. There is a tradition of studying executive function in both typical and atypical populations, and the present study investigates executive functions in children with severe speech and motor impairments who are communicating using communication aids with graphic symbols, letters, and/or words. There are few neuropsychological studies of children in this group and little is known about their cognitive functioning, including executive functions. It was hypothesized that aided communication would tax executive functions more than speech. Twenty-nine children using communication aids and 27 naturally speaking children participated. Structured tasks resembling everyday activities, where the action goals had to be reached through communication with a partner, were used to get information about executive functions. The children (a) directed the partner to perform actions like building a Lego tower from a model the partner could not see and (b) gave information about an object without naming it to a person who had to guess what object it was. The executive functions of planning, monitoring, and impulse control were coded from the children's on-task behavior. Both groups solved most of the tasks correctly, indicating that aided communicators are able to use language to direct another person to do a complex set of actions. Planning and lack of impulsivity was positively related to task success in both groups. The aided group completed significantly fewer tasks, spent longer time and showed more variation in performance than the comparison group. The aided communicators scored lower on planning and showed more impulsivity than the comparison group, while both groups showed an equal degree of monitoring of the work progress. The results are consistent with the hypothesis that aided language tax executive functions more than speech. The results may also indicate that aided communicators have less experience with these kinds of play activities. The findings broaden the perspective on executive functions and have implications for interventions for motor-impaired children developing aided communication.

  11. Investigating executive functions in children with severe speech and movement disorders using structured tasks

    PubMed Central

    Stadskleiv, Kristine; von Tetzchner, Stephen; Batorowicz, Beata; van Balkom, Hans; Dahlgren-Sandberg, Annika; Renner, Gregor

    2014-01-01

    Executive functions are the basis for goal-directed activity and include planning, monitoring, and inhibition, and language seems to play a role in the development of these functions. There is a tradition of studying executive function in both typical and atypical populations, and the present study investigates executive functions in children with severe speech and motor impairments who are communicating using communication aids with graphic symbols, letters, and/or words. There are few neuropsychological studies of children in this group and little is known about their cognitive functioning, including executive functions. It was hypothesized that aided communication would tax executive functions more than speech. Twenty-nine children using communication aids and 27 naturally speaking children participated. Structured tasks resembling everyday activities, where the action goals had to be reached through communication with a partner, were used to get information about executive functions. The children (a) directed the partner to perform actions like building a Lego tower from a model the partner could not see and (b) gave information about an object without naming it to a person who had to guess what object it was. The executive functions of planning, monitoring, and impulse control were coded from the children's on-task behavior. Both groups solved most of the tasks correctly, indicating that aided communicators are able to use language to direct another person to do a complex set of actions. Planning and lack of impulsivity was positively related to task success in both groups. The aided group completed significantly fewer tasks, spent longer time and showed more variation in performance than the comparison group. The aided communicators scored lower on planning and showed more impulsivity than the comparison group, while both groups showed an equal degree of monitoring of the work progress. The results are consistent with the hypothesis that aided language tax executive functions more than speech. The results may also indicate that aided communicators have less experience with these kinds of play activities. The findings broaden the perspective on executive functions and have implications for interventions for motor-impaired children developing aided communication. PMID:25249999

  12. Enhancing The National Map Through Tactical Planning and Performance Monitoring

    USGS Publications Warehouse

    ,

    2008-01-01

    Tactical planning and performance monitoring are initial steps toward improving 'the way The National Map works' and supporting the U.S. Geological Survey (USGS) Science Strategy. This Tactical Performance Planning Summary for The National Map combines information from The National Map 2.0 Tactical Plan and The National Map Performance Milestone Matrix. The National Map 2.0 Tactical Plan is primarily a working document to guide The National Map program's execution, production, and metrics monitoring for fiscal years (FY) 2008 and 2009. The Tactical Plan addresses data, products, and services, as well as supporting and enabling activities. The National Map's 2-year goal for FY 2008 and FY 2009 is to provide a range of geospatial products and services that further the National Spatial Data Infrastructure and underpin USGS science. To do this, the National Geospatial Program will develop a renewed understanding during FY 2008 of key customer needs and requirements, develop the infrastructure to support The National Map business model, modernize its business processes, and reengineer its workforce. Priorities for The National Map will be adjusted if necessary to respond to changes to the project that may impact resources, constrain timeframes, or change customer needs. The supporting and enabling activities that make it possible to produce the products and services of The National Map will include partnership activities, improved compatibility of systems, outreach, and integration of data themes.

  13. Corporate objectives and the planning process.

    PubMed

    White, S

    1990-02-01

    The embodiment of corporate objectives in a workable planning process enables all employees to develop an identity larger than themselves. This results in a more cohesive body and makes it easier to implement the organization's strategy and mission. The senior executives at University Hospital have a long history with the organization and therefore know it well. Whether the new process makes planning more coordinated and comprehensive will be measured by both the subjective and the objective assessment of these executives.

  14. Memoized Symbolic Execution

    NASA Technical Reports Server (NTRS)

    Yang, Guowei; Pasareanu, Corina S.; Khurshid, Sarfraz

    2012-01-01

    This paper introduces memoized symbolic execution (Memoise), a novel approach for more efficient application of forward symbolic execution, which is a well-studied technique for systematic exploration of program behaviors based on bounded execution paths. Our key insight is that application of symbolic execution often requires several successive runs of the technique on largely similar underlying problems, e.g., running it once to check a program to find a bug, fixing the bug, and running it again to check the modified program. Memoise introduces a trie-based data structure that stores the key elements of a run of symbolic execution. Maintenance of the trie during successive runs allows re-use of previously computed results of symbolic execution without the need for re-computing them as is traditionally done. Experiments using our prototype embodiment of Memoise show the benefits it holds in various standard scenarios of using symbolic execution, e.g., with iterative deepening of exploration depth, to perform regression analysis, or to enhance coverage.

  15. 5 CFR 412.301 - Obtaining approval to conduct a Senior Executive Service candidate development program (SESCDP).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Obtaining approval to conduct a Senior... DEVELOPMENT Senior Executive Service Candidate Development Programs § 412.301 Obtaining approval to conduct a Senior Executive Service candidate development program (SESCDP). (a) An SESCDP is an OPM-approved...

  16. 29 CFR 1608.5 - Affirmative action compliance programs under Executive Order No. 11246, as amended.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 4 2011-07-01 2011-07-01 false Affirmative action compliance programs under Executive... EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.5 Affirmative action compliance programs under Executive Order No. 11246, as...

  17. 29 CFR 1608.5 - Affirmative action compliance programs under Executive Order No. 11246, as amended.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Affirmative action compliance programs under Executive... EMPLOYMENT OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.5 Affirmative action compliance programs under Executive Order No. 11246, as...

  18. Flight Project Data Book

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The Office of Space Science and Applications (OSSA) is responsible for the overall planning, directing, executing, and evaluating that part of the overall NASA program that has the goal of using the unique characteristics of the space environment to conduct a scientific study of the universe, to understand how the Earth works as an integrated system, to solve practical problems on Earth, and to provide the scientific and technological research foundation for expanding human presence beyond Earth orbit into the solar system. OSSA guides its program toward leadership through its pursuit of excellence across the full spectrum of disciplines. OSSA pursues these goals through an integrated program of ground-based laboratory research and experimentation, suborbital flight of instruments on airplanes, balloons, and sounding rockets; flight of instruments and the conduct of research on the Shuttle/Spacelab system and on Space Station Freedom; and development and flight of automated Earth-orbiting and interplanetary spacecraft. The OSSA program is conducted with the participation and support of other Government agencies and facilities, universities throughout the United States, the aerospace contractor community, and all of NASA's nine Centers. In addition, OSSA operates with substantial international participation in many aspects of our Space Science and Applications Program. OSSA's programs currently in operation, those approved for development, and those planned for future missions are described.

  19. 2017-04-28_B61-12-Program Overview(OUO).

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daniels, Vonceil

    2017-04-01

    The B61-12 LEP is currently executing Phase 6.4 Production Engineering with a focus on qualification and preproduction activities. All major milestones have been successfully completed to date. Component Final Design Reviews (FDRs) continue in FY17, with 19 of 38 complete as of April 28. A series of normal and abnormal environments tests occurred in the first half of FY17, and the first qualification flight test on an F-16 was executed in March. Two F-15 qualification flight tests are planned in August. To support Pantex readiness, the first all-up-round (AUR) trainer builds were completed in December 2016. Progress is ongoing towardmore » closure of Air Force Nuclear Weapons Center (tailkit) and Los Alamos National Laboratory interface gaps, and resolution of producibility challenges with the Kansas City National Security Campus (KCNSC).« less

  20. Performance Metrics for Monitoring Parallel Program Executions

    NASA Technical Reports Server (NTRS)

    Sarukkai, Sekkar R.; Gotwais, Jacob K.; Yan, Jerry; Lum, Henry, Jr. (Technical Monitor)

    1994-01-01

    Existing tools for debugging performance of parallel programs either provide graphical representations of program execution or profiles of program executions. However, for performance debugging tools to be useful, such information has to be augmented with information that highlights the cause of poor program performance. Identifying the cause of poor performance necessitates the need for not only determining the significance of various performance problems on the execution time of the program, but also needs to consider the effect of interprocessor communications of individual source level data structures. In this paper, we present a suite of normalized indices which provide a convenient mechanism for focusing on a region of code with poor performance and highlights the cause of the problem in terms of processors, procedures and data structure interactions. All the indices are generated from trace files augmented with data structure information.. Further, we show with the help of examples from the NAS benchmark suite that the indices help in detecting potential cause of poor performance, based on augmented execution traces obtained by monitoring the program.

Top