Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1992.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority
1991-09-01
The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's plans for implementing the Program during Fiscal Year (FY) 1992. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1992 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of May 21, 1991. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-16) lists FY 1992 new-start projects. ''Ongoing'' status indicates that the project started in FY 1991 or before and that it is expected to continue through part or all of FY 1992. ''Deferred'' means that BPA implementation has been postponed to FY 1993 or later. ''Completed'' indicates completion during FY 1991. ''New'' denotes projects planned for BPA implementation in FY 1992. A number of projects are expected to begin in late FY 1991 and have been listed in Table 1 of the AIWP as ''Projected FY '91 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1991. These projects have been listed in Table 1 as ''Projected FY '91 Completions,'' based on their projected completion dates.« less
Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1990.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority
1990-01-01
The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1990. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge progress and the success of Program implementation. The FY 1990 AIWP also follows the outline developed by the Policy Review Group (PRG) during Step 1 of initial cycle of the Implementation Planning Process (IPP), which is described in Section III. A number of new FY 1990 projects were still under review by the PRG as the AIWP went to press. These projects have been noted in Table 2, New FY 1990 Program Projects, and in the text of the AIWP. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1990 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded Program projects discussed in the FY 1990 AIWP are listed in Tables 1 and 2 according to their status as of September 30, 1989. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-18) lists all projects which BPA plans to fund as ''new'' projects in FY 1990. ''Ongoing'' status indicates that the project started in FY 1989 or before, and that it is expected to continue in FY 1990. ''Deferred'' means that BPA implementation has been postponed to FY 1991 or later. ''Completed'' indicates completion during FY 1989. ''New'' denotes projects that BPA plans to start in FY 1990. One new FY 1990 project was included in the draft FY 1990 AIWP as a ''conditional'' project, as a result of PRG recommendations at the May 25, 1989, PRG meeting. If specified conditions are met, BPA will begin to implement the project in FY 1990. Section VII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.« less
Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1991.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority
1990-09-01
The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's draft plans for implementing the Program during Fiscal Year (FY) 1991. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Items 10.1-10.3. The AIWP includes schedules with key milestones for 1 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of September 1, 1990. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-17) lists FY 1991 new-start projects. ''Ongoing'' status indicates that the project started in FY 1990 or before and that it is expected to continue through part or all of FY 1991. ''Deferred'' means that BPA implementation has been postponed to FY 1992 or later. ''Completed'' indicates completion during FY 1990. ''New'' denotes projects planned for BPA implementation in FY 1991. However, several of these new projects were still under review by the Policy Review Group as the FY 1991 AIWP went to press. The new projects still under review have been noted in Table 2 and in the text of the AIWP. A number of projects are expected to begin in late FY 1990 and have been listed in Table 1 of the Draft AIWP as ''Projected FY '90 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1990. These projects have been listed in Table 1 as ''Projected FY '90 Completions,'' based on their projected completion dates. Section VIII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.« less
1987-01-01
enough to sustain one wartime station overseas as well as satisfy training and maintenance needs. Advanced TacticalAir Reconnaissance System ( ATARS ...The ATARS is an umbrella concept for a series of upgrades in tactical reconnaissance capabilities. Major elements of the program include the Tactical...Funding Funding Funding E-3A Modifkation Development: $ Millions 105.2 96.8 110.7 88.4 Procurement: Quantity - - - - $ Millions .9 33.5 27.7 40.7 ATARS
Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority
1992-09-01
The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Programmore » projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.« less
Federal agency biodefense funding, FY2012-FY2013.
Franco, Crystal; Sell, Tara Kirk
2012-06-01
Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through proposed funding for FY2012. This article updates those figures with budgeted amounts for FY2013, specifically analyzing the budgets and allocations for civilian biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, and State; the Environmental Protection Agency; and the National Science Foundation. As in previous years, our analysis indicates that the majority (>90%) of the "biodefense" programs included in the FY2013 budget have both biodefense and non-biodefense goals and applications-that is, programs to improve infectious disease research, public health and hospital preparedness, and disaster response more broadly. Programs that focus solely on biodefense represent a small proportion (<10%) of our analysis, as the federal agencies continue to prioritize all-hazards preparedness. For FY2013, the federal budget for programs focused solely on civilian biodefense totals $574.2 million, and the budget for programs with multiple goals and applications, including biodefense, is $4.96 billion, for an overall total of $5.54 billion.
2015 Fermilab Laboratory Directed Research & Development Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wester, W.
2016-05-26
The Fermi National Accelerator Laboratory (FNAL) is conducting a Laboratory Directed Research and Development (LDRD) program. Fiscal year 2015 represents the first full year of LDRD at Fermilab and includes seven projects approved mid-year in FY14 and six projects approved in FY15. One of the seven original projects has been completed just after the beginning of FY15. The implementation of LDRD at Fermilab is captured in the approved Fermilab 2015 LDRD Annual Program Plan. In FY15, the LDRD program represents 0.64% of Laboratory funding. The scope of the LDRD program at Fermilab will be established over the next couple ofmore » years where a portfolio of about 20 on-going projects representing approximately between 1% and 1.5% of the Laboratory funding is anticipated. This Annual Report focuses on the status of the current projects and provides an overview of the current status of LDRD at Fermilab.« less
LDRD 2014 Annual Report: Laboratory Directed Research and Development Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hatton, Diane
Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy (DOE) in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2014, as required. In FY 2014, the BNL LDRD Program funded 40 projects, 8 of which were new starts, at a total cost of $9.6M.
Laboratory Directed Research and Development Program FY 2006 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sjoreen, Terrence P
2007-04-01
The Oak Ridge National Laboratory (ORNL) Laboratory Directed Research and Development (LDRD) Program reports its status to the US Departmental of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, 'Laboratory Directed Research and Development' (April 19, 2006), which establishes DOE's requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2006. The associated FY 2006 ORNL LDRD Self-Assessment (ORNL/PPA-2007/2) provides financial data about themore » FY 2006 projects and an internal evaluation of the program's management process.« less
Space Transportation Propulsion Systems
NASA Technical Reports Server (NTRS)
Liou, Meng-Sing; Stewart, Mark E.; Suresh, Ambady; Owen, A. Karl
2001-01-01
This report outlines the Space Transportation Propulsion Systems for the NPSS (Numerical Propulsion System Simulation) program. Topics include: 1) a review of Engine/Inlet Coupling Work; 2) Background/Organization of Space Transportation Initiative; 3) Synergy between High Performance Computing and Communications Program (HPCCP) and Advanced Space Transportation Program (ASTP); 4) Status of Space Transportation Effort, including planned deliverables for FY01-FY06, FY00 accomplishments (HPCCP Funded) and FY01 Major Milestones (HPCCP and ASTP); and 5) a review current technical efforts, including a review of the Rocket-Based Combined-Cycle (RBCC), Scope of Work, RBCC Concept Aerodynamic Analysis and RBCC Concept Multidisciplinary Analysis.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walters, T.; Savage, S.; Brown, J.
At the request of the U. S. Department of Agriculture (USDA) Rural Development, the National Renewable Energy Laboratory reviewed projects awarded in the Section 9006 Program: Renewable Energy Systems and Energy Efficiency Improvements Program. This report quantifies federal and private investment, outlines project status based on recent field updates, and calculates the effects on energy and emissions of energy efficiency and renewable energy projects awarded grants in FY 2003, FY 2004, and FY 2005. An overview of the program challenges and modifications in the first three years of operation is also included.
NASA Technical Reports Server (NTRS)
Lytle, John
2001-01-01
This report provides an overview presentation of the 2000 NPSS (Numerical Propulsion System Simulation) Review and Planning Meeting. Topics include: 1) a background of the program; 2) 1999 Industry Feedback; 3) FY00 Status, including resource distribution and major accomplishments; 4) FY01 Major Milestones; and 5) Future direction for the program. Specifically, simulation environment/production software and NPSS CORBA Security Development are discussed.
1996-01-05
hereafter referred to as DoD Components, invite small business firms to submit proposals under this program solicitation entitled Small Business Innovation...role of small business in meeting DoD research and development needs, fostering and encouraging participation by minority and disadvantaged persons in
ORNLs Laboratory Directed Research and Development Program FY 2009 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2010-03-01
The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2009. The associated FY 2009 ORNL LDRD Self-Assessment (ORNL/PPA-2010/2) provides financial data andmore » an internal evaluation of the program’s management process.« less
ORNLs Laboratory Directed Research and Development Program FY 2013 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2014-03-01
The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the US Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2013. The associated FY 2013 ORNL LDRD Self-Assessment (ORNL/PPA-2014/2) provides financial datamore » and an internal evaluation of the program’s management process.« less
ORNLs Laboratory Directed Research and Development Program FY 2008 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2009-03-01
The Oak Ridge National Laboratory (ORNL) Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2008. The associated FY 2008 ORNL LDRD Self-Assessment (ORNL/PPA-2008/2) provides financial data and anmore » internal evaluation of the program’s management process.« less
ORNLs Laboratory Directed Research and Development Program FY 2012 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2013-03-01
The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the US Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2012. The associated FY 2012 ORNL LDRD Self-Assessment (ORNL/PPA-2012/2) provides financial datamore » and an internal evaluation of the program’s management process.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bermudez, J.V.; Lagos, L.E.; Ebadian, M.A.
Throughout this project, the Hemispheric Center for Environmental Technology's (HCET) goal was to initiate a comprehensive research program on sustainable development, environmental protection, and the market for environmental technologies in Latin America and the Caribbean. The data resulting from the work associated with this project has been entered into an information system which supplies useful and accurate data knowledge to interested parties. When relevant information has been found to be insufficient and/or not readily available, HCET has investigated, conducted research, and subsequently made this information available to the public. During FY96, HCET completed numerous tasks to contribute to this bodymore » of knowledge. This initiative will continue throughout 1997. Highlights of FY96 are described.« less
Laboratory Directed Research and Development Program FY2016 Annual Summary of Completed Projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
ORNL FY 2016 Annual Summary of Laboratory Directed Research and Development Program (LDRD) Completed Projects. The Laboratory Directed Research and Development (LDRD) program at ORNL operates under the authority of DOE Order 413.2C, “Laboratory Directed Research and Development” (October 22, 2015), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. The LDRD program funds are obtained through a charge to all Laboratory programs. ORNL reports its status to DOE in March of each year.
NASA's Microgravity Research Program
NASA Technical Reports Server (NTRS)
Woodard, Dan
1998-01-01
This fiscal year (FY) 1997 annual report describes key elements of the NASA Microgravity Research Program (MRP) as conducted by the Microgravity Research Division (MRD) within NASA's Office of Life and Microgravity, Sciences and Applications. The program's goals, approach taken to achieve those goals, and program resources are summarized. All snapshots of the program's status at the end of FY 1997 and a review of highlights and progress in grounds and flights based research are provided. Also described are major space missions that flew during FY 1997, plans for utilization of the research potential of the International Space Station, the Advanced Technology Development (ATD) Program, and various educational/outreach activities. The MRP supports investigators from academia, industry, and government research communities needing a space environment to study phenomena directly or indirectly affected by gravity.
Servicemembers Opportunity Colleges 1972-1997. (Submitted as Part of SOC Final FY 96 Report.)
ERIC Educational Resources Information Center
Anderson, Clinton L.
This book traces the history of the Servicemembers Opportunity College (SOC) program, which allows military personnel to obtain civilian education at more that 1,000 designated community colleges, technical institutes, and four-year institutions nationwide. Among the topics discussed in this history of the SOC program's development as the…
Billions for biodefense: federal agency biodefense funding, FY2009-FY2010.
Franco, Crystal
2009-09-01
Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through 2009. This article updates those figures with budgeted amounts for FY2010, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, and State; the Environmental Protection Agency; and the National Science Foundation. This year's article also provides an assessment of the proportion of the biodefense budget that serves multiple programmatic goals and benefits, including research into infectious disease pathogenesis and immunology, public health planning and preparedness, and disaster response efforts. The FY2010 federal budget for civilian biodefense totals $6.05 billion. Of that total, $4.96 billion is budgeted for programs that serve multiple goals and provide manifold benefits.
Laboratory Directed Research and Development FY-15 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pillai, Rekha Sukamar
The Laboratory Directed Research and Development (LDRD) Program at Idaho National Laboratory (INL) reports its status to the U.S. Department of Energy (DOE) by March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the laboratory director broad flexibility for program implementation. LDRD funds are obtained through a charge to all INL programs. This report includes summaries of all INL LDRD research activities supported during Fiscal Year (FY) 2015.
NASA Microgravity Science and Applications Program
NASA Technical Reports Server (NTRS)
1992-01-01
Key elements of the microgravity research program as conducted by the Microgravity Science and Applications Division (MSAD) within the Office of Space Science and Applications (OSSA) during fiscal year (FY) 1992 are described. This NASA funded program supported investigators from the university, industry, and government research communities. The program's goals, the approach taken to achieve those goals, and the resources that were available are summarized. It provides a 'snapshot' of the Program's status at the end of FY 1992 and reviews highlights and progress in the ground and flight-based research during the year. It also describes four major space missions that flew during FY 1992, the advanced technology development (ATD) activities, and the plans to use the research potential of Space Station Freedom and other advanced carriers. The MSAD program structure encompassed five research areas: (1) Biotechnology, (2) Combustion Science, (3) Fluid Physics, (4) Materials Science, and (5) Benchmark Physics.
NASA Occupational Health Program FY98 Self-Assessment
NASA Technical Reports Server (NTRS)
Brisbin, Steven G.
1999-01-01
The NASA Functional Management Review process requires that each NASA Center conduct self-assessments of each functional area. Self-Assessments were completed in June 1998 and results were presented during this conference session. During FY 97 NASA Occupational Health Assessment Team activities, a decision was made to refine the NASA Self-Assessment Process. NASA Centers were involved in the ISO registration process at that time and wanted to use the management systems approach to evaluate their occupational health programs. This approach appeared to be more consistent with NASA's management philosophy and would likely confer status needed by Senior Agency Management for the program. During FY 98 the Agency Occupational Health Program Office developed a revised self-assessment methodology based on the Occupational Health and Safety Management System developed by the American Industrial Hygiene Association. This process was distributed to NASA Centers in March 1998 and completed in June 1998. The Center Self Assessment data will provide an essential baseline on the status of OHP management processes at NASA Centers. That baseline will be presented to Enterprise Associate Administrators and DASHO on September 22, 1998 and used as a basis for discussion during FY 99 visits to NASA Centers. The process surfaced several key management system elements warranting further support from the Lead Center. Input and feedback from NASA Centers will be essential to defining and refining future self assessment efforts.
Electric and Hybrid Vehicles Program. Sixteenth annual report to Congress for fiscal year 1992
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-08-01
This report describes the progress achieved in developing electric and hybrid vehicle technologies, beginning with highlights of recent accomplishments in FY 1992. Detailed descriptions are provided of program activities during FY 1992 in the areas of battery, fuel cell, and propulsion system development, and testing and evaluation of new technology in fleet site operations and in laboratories. This Annual Report also contains a status report on incentives and use of foreign components, as well as a list of publications resulting from the DOE program.
Physics of the Cosmos Program Annual Technology Report
NASA Technical Reports Server (NTRS)
Pham, Bruce Thai; Cardiff, Ann H.
2015-01-01
What's in this Report? What's New? This fifth Program Annual Technology Report (PATR) summarizes the Programs technology development activities for fiscal year (FY) 2015. The PATR serves four purposes.1. Summarize the technology gaps identified by the astrophysics community;2. Present the results of this years technology gap prioritization by the PCOS Technology Management Board (TMB);3. Report on newly funded PCOS Strategic Astrophysics Technology (SAT) projects; and4. Detail progress, current status, and activities planned for the coming year for all technologies supported by PCOS Supporting Research and Technology (SRT) funding in FY 2015. .
1998-06-01
FOR THE MAJORITY OF THE POPULATION RECEIVNG CARE IN FY 95 AND FY 96 37 TABLE 4: COMPARISION OF GOVERNMENT COSTS PER EPISODE IN CIVILIAN AND MILITARY ...FACKLTITES 40 TABLE 5: COMPARISION OF TOTAL GOVERNMENT COSTS IN CIVILIAN AND MILITARY FACILITIES 41 TABLE 6: SUMMARY OF PROJECTED TOTAL GOVERNMENT...is managed by an executive military health care staff, known as the Lead Agent, in each of 14 geographic regions in the U.S., Europe and Pacific
NASA's Microgravity Research Program
NASA Technical Reports Server (NTRS)
Woodard, Dan R. (Editor); Henderson, Robin N. (Technical Monitor)
2000-01-01
The Fiscal Year 1999 Annual Report describes key elements of the NASA Microgravity Research Program. The Program's goals, approach taken to achieve those goals, and program resources are summarized. A review of the Program's status at the end of FY1999 and highlights of the ground-and-flight research are provided.
1992-04-10
Devens - Fort Huachuca FY 91 FY 95 Fort McClellan FY 92 FY 96 Fort Chaffee FY 92 FY 97 Cameron Station FY 91 FY 95 53 Stand Alone Housing Sites FY 90 FY...Army, Headquarters Forces Command, &as Realianment and Closure Implementation Plan - Fort Devens Closure Package, Implementation Plan, Fort McPherson, GA...Classification) RAC , What Will It Cost? 12. PERSONAL AUTHOR(S) TLIN, Robert B. LTC, USA 13. TYPE OF REPORT 13b. TIME COVERED 14. DATE OF REPORT (Year
1993-10-01
VLF/ELF) communication systems, used for early warning and strategic communications, are dependent on the electron densities in the "C" and "D...information into optical or electronic signals that can be remotely monitored. During FY92, an in-depth and definitive assessment of the feasibility...particularly metal finishing and electronics operations. BENEFITS: The broad program described above will provide the opportunity for EPA, the
NASA Technical Reports Server (NTRS)
1988-01-01
Key elements of national policy, NASA goals and objectives, and other materials that comprise the framework for NASA planning are included. The contents are expressed as they existed through much of 1988; thus they describe the strategic context employed by NASA in planning both the FY 1989 program just underway and the proposed FY 1990 program. NASA planning will continue to evolve in response to national policy requirements, a changing environment, and new opportunities. Agenda for Tomorrow provides a status report as of the time of its publication.
NASA Microgravity Research Program
NASA Technical Reports Server (NTRS)
Woodard, Dan
1999-01-01
The Fiscal Year 1998 Annual Report describes key elements of the NASA Microgravity Research Program. The Program's goals, approach taken to achieve those goals, and program resources are summarized. A review of the Program's status at the end of FY1998 and highlights of the ground- and-flight-based research are provided.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2011. The associated FY 2011 ORNL LDRD Self-Assessment (ORNL/PPA-2012/2) provides financial datamore » and an internal evaluation of the program’s management process.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2010. The associated FY 2010 ORNL LDRD Self-Assessment (ORNL/PPA-2011/2) provides financial datamore » and an internal evaluation of the program’s management process.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
We conducted physics experiments: record normalized {Beta} = 4.9 achieved in VH-mode, {Beta} limits of ITER-like configurations evaluated, FWCD commissioning. The tokamak vessel was opened to atmosphere for six weeks and a number of key diagnostics for understanding the divertor were installed. The DIII-D Advisory Committee met in January to review the DIII-D program and plan. They commended us for recent progress and supported the vanadium divertor design. The U.S./Japan DIII-D steering committee met and recommended extending the agreement to the year 2000. The field work proposal for FY 96/97 was presented in Washington on March 29, 1995. A reviewmore » of the DIII-D plan to install vanadium structural components as part of the new radiative divertor modification was held in Washington 31, 1995 and the panel endorsed the plans. Preliminary plans were developed with PPPL for collaborations in FY96,« less
Department of Defense Logistics Roadmap 2008. Volume 2
2008-07-01
endeavors to better synchronize field and depot maintenance data systems resulting in faster Programmed Depot Maintenance (PDM) completion. The...mechanic-centric”. This will put the mechanic actually on the aircraft more often, with the tools and resources to complete their tasks, resulting in...MAJCOM’s: 1. Status to target 2. Initiatives 3. Results FY07 Level: FY10 Target: Goal: The five desired effects of AFSO21 are to: 1. Increased
FY2004 SYSTEM ENGINEER PROGRAM MANAGER ANNUAL REPORT
DOE Office of Scientific and Technical Information (OSTI.GOV)
JACKSON, G.J.
2004-10-29
During FY 2004, reviews of the FH System Engineer (SE) Program were conducted by the Independent Assessment (IA) Group. The results of these reviews are summarized as a part of this document. Additional reviews were performed by FH Engineering personnel. SE Engineering reviews performed include Periodic Walkdowns (typically, quarterly) by the SEs, a review of System Notebooks by the System Engineer Program Manager (SEPM), annual status report by each SE, and an annual status report by each of the Project Chief Engineers (PCEs). FY 2004 marked the completion of the first round of Vital Safety System assessments. Each of themore » VSSs on the FH VSS list has been evaluated at least once by either the FH Independent Assessment organization or was included as a part of DOE Phase II assessment. Following the completion of the K-Basins Assessment in May 2004, a review of the VSS assessment process was completed. Criteria were developed by FH, and concurred with by RL, to determine the frequency and priority of future VSS assessments. Additional actions have been taken to increase the visibility and emphasis assigned to VSSs. Completion of several Documented Safety Analyses (DSA), in combination with efforts to remove source term materials from several facilities, enabled the number of systems on the FH VSS list to be reduced from 60 at the beginning of FY 2004 to 48 by the end of FY 2004. It is expected that there will be further changes to the FH VSS list based on additional DSA revisions and continued progress towards reduction of source terms across the Hanford Site. Other new VSSs may be added to the list to reflect the relocation of materials away from the River Corridor to interim storage locations on the Central Plateau.« less
2015-08-05
This final rule updates the prospective payment rates for Medicare inpatient hospital services provided by inpatient psychiatric facilities (IPFs) (which are freestanding IPFs and psychiatric units of an acute care hospital or critical access hospital). These changes are applicable to IPF discharges occurring during fiscal year (FY) 2016 (October 1, 2015 through September 30, 2016). This final rule also implements: a new 2012-based IPF market basket; an updated IPF labor-related share; a transition to new Core Based Statistical Area (CBSA) designations in the FY 2016 IPF Prospective Payment System (PPS) wage index; a phase-out of the rural adjustment for IPF providers whose status changes from rural to urban as a result of the wage index CBSA changes; and new quality measures and reporting requirements under the IPF quality reporting program. This final rule also reminds IPFs of the October 1, 2015 implementation of the International Classification of Diseases, 10th Revision, Clinical Modification (ICD-10-CM), and updates providers on the status of IPF PPS refinements.
Defense Energy Support Center Fact Book, Fiscal Year 1999, Twenty-Second Edition
1999-01-01
numbers SOURCE: FACILITIES AND DISTRIBUTION MANAGEMENT COMMODITY BUSINESS UNIT 11 OCONUS COCO 10 8,717,850...GOCO 7 1,518,905 SOURCE: FACILITIES AND DISTRIBUTION MANAGEMENT COMMODITY BUSINESS UNIT DLA MANAGED STORAGE...FY 95 FY 96 FY 97 FY 98 FY 99 SOURCE: FACILITIES AND DISTRIBUTION MANAGEMENT COMMODITY BUSINESS UNIT 13 0 20 40 60 80 100 120 140 160 180 200 220
Activities in Idaho; status of projects, fiscal years 1982-83
Channel, Linda K.
1982-01-01
Twenty-three projects were conducted by the Water Resources Division of the U.S. Geological Survey in Idaho during FY 's (fiscal year) 1982-83. These projects were done in cooperation with seven State and local and nine federal agencies. State and local cooperative funding amounted to $566,123 in FY 1982 and $570,000 (projected monies) in FY 1983; Federal funding amounted to $2,083,748 in FY 1982 and $1,656,494 (projected monies) in FY 1983. Eighty-three persons were employed as of September, FY 1982--40 full time and 43 other than full time. Sixty-five persons were employed as of October, FY 1983--35 full time and 30 other than full time. In addition, the Water Resources Division maintains a project office at the Idaho National Engineering Laboratory. Work there is done in cooperation with the U.S. Department of Energy, which provides most of the funding. Some Federal funds are provided for special projects. Projects other than continuing programs for collection of hydrologic data included flood-mapping studies, geothermal-resource investigations, groundwater-quality assessments, basin-and region-wide water-resource investigations , river quality-of-water monitoring studies, volcanic-ash-related studies, groundwater trends and stream gaging-program evaluations, river erosion and sediment-transport studies, water-budget and groundwater-use determinations, and a sole-source aquifer appraisal. (USGS)
50 CFR 648.96 - Monkfish annual adjustment process and framework specifications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... meet on or before November 15 of each year to develop target TACs for the upcoming fishing year in.... (b) Annual Adjustment Procedures—(1) Annual Target TACs for FY 2007 through FY 2009—(i) NFMA. The annual target TAC for the NFMA is 5,000 mt for FY 2007 through FY 2009, unless otherwise recommended by...
2014 Fermilab Laboratory Directoed Research & Development Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
W. Wester
After initiation by the Fermilab Laboratory Director, a team from the senior Laboratory leadership and a Laboratory Directed Research and Development (LDRD) Advisory Committee developed an implementation plan for LDRD at Fermilab for the first time. This implementation was captured in the approved Fermilab 2014 LDRD Program Plan and followed directions and guidance from the Department of Energy (DOE) order, DOE O 413.2B, a “Roles, Responsibilities, and Guidelines, …” document, and examples of best practices at other DOE Office of Science Laboratories. At Fermilab, a FY14 midyear Call for Proposals was issued. A LDRD Selection Committee evaluated those proposals thatmore » were received and provided a recommendation to the Laboratory Director who approved seven LDRD projects. This Annual Report focuses on the status of those seven projects and provides an overview of the current status of LDRD at Fermilab. The seven FY14 LDRD approved projects had a date of initiation late in FY14 such that this report reflects approximately six months of effort approximately through January 2015. The progress of these seven projects, the subsequent award of six additional new projects beginning in FY15, and preparations for the issuance of the FY16 Call for Proposals indicates that LDRD is now integrated into the overall annual program at Fermilab. All indications are that LDRD is improving the scientific and technical vitality of the Laboratory and providing new, novel, or cutting edge projects carried out at the forefront of science and technology and aligned with the mission and strategic visions of Fermilab and the Department of Energy.« less
Lawmakers seek end to budget stalemate
NASA Astrophysics Data System (ADS)
Carlowicz, Michael
On March 15, President Bill Clinton signed into law the tenth short-term spending measure of the now-sixmonth-old 1996 fiscal year (FY'96), funding the federal government through March 22. At the same time, budget negotiators from both the Republican and Democratic parties scurried to put the finishing touches on a $166 billion-omnibus appropriations bill, H.R. 3019, to pay the government's bills for the rest of the fiscal year.As of March 21, parts of a dozen federal cabinet-level departments and agencies still did not have a definitive budget allocation for FY'96. Nearly all national science research and development programs, agencies, and departments remained tied up by that budget struggle, though very little of the debate has anything to do with those programs (Eos, February 20). H.R. 3019 is designed to end the string of short-term spending measures and to fund all federal departments for the remaining six months of the fiscal year. Congressional leaders hoped to have the bill passed by March 22, though many representatives anticipated that at least one more short-term spending resolution would have to be passed before budget negotiations with the President could be completed.
FY 1991 safety program status report
NASA Technical Reports Server (NTRS)
1991-01-01
In FY 1991, the NASA Safety Division continued efforts to enhance the quality and productivity of its safety oversight function. Recent initiatives set forth in areas such as training, risk management, safety assurance, operational safety, and safety information systems have matured into viable programs contributing to the safety and success of activities throughout the Agency. Efforts continued to develop a centralized intra-agency safety training program with establishment of the NASA Safety Training Center at the Johnson Space Center (JSC). The objective is to provide quality training for NASA employees and contractors on a broad range of safety-related topics. Courses developed by the Training Center will be presented at various NASA locations to minimize travel and reach the greatest number of people at the least cost. In FY 1991, as part of the ongoing efforts to enhance the total quality of NASA's safety work force, the Safety Training Center initiated development of a Certified Safety Professional review course. This course provides a comprehensive review of the skills and knowledge that well-rounded safety professionals must possess to qualify for professional certification. FY 1992 will see the course presented to NASA and contractor employees at all installations via the NASA Video Teleconference System.
Civil Space Technology Initiative: a First Step
NASA Technical Reports Server (NTRS)
1988-01-01
This is the first published overview of OAST's focused program, the Civil Space Technology Initiative, (CSTI) which started in FY88. This publication describes the goals, technical approach, current status, and plans for CSTI. Periodic updates are planned.
40 CFR 96.287 - Change in regulatory status.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR SO2 Opt-in Units § 96.287 Change in regulatory status. (a) Notification. If a CAIR SO2 opt-in unit becomes a CAIR SO2 unit under § 96.204, then the CAIR designated representative shall notify in writing...
Report: FISMA - Fiscal Year 2004 Status of EPA’s Computer Security Program
Report #2004-S-00007, September 30, 2004. This report synopsizes the results of information technology security work the U.S. Environmental Protection Agency’s Office of Inspector General (OIG) performed during Fiscal Year (FY) 2004.
Report: FY 2007 FISMA Report: Status of EPA’s Computer Security Program
Report #2007-S-00003, September 25, 2007. This is the Office of Inspector General’s Fiscal Year 2007 Federal Information Security Management Act Reporting Template, as prescribed by the Office of Management and Budget (OMB).
LTPP beyond FY 2009 : what needs to be done?
DOT National Transportation Integrated Search
2009-01-01
This report summarizes the current status of the Long-Term Pavement Performance (LTPP) program and its major activities -- data collection, data storage, data analysis, and product development. It describes the work that will be needed beyond 2009 to...
Federal Geothermal Research Program Update - Fiscal Year 2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laney, P.T.
2002-08-31
This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2001. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy.
Clinical Investigation Program Report FY90
1990-10-01
Postpartum Blues and Associated Factors in a ilitary 52 90-6 Population. (C) (PR) 1990 Changes in Nutritional Statu: and Physical Conditioning 53 90-g...116 90-26 to the Nutritional Status of Anorectic Head and Neck Cancer Patients Currently Undergoing Radiation Therapy. (0) 1990 Training General...saturation monitoring. Problems Critical Care. (In Press) Charney PJ, Martindale RG: The relationship of nutritional status at diagnosis to survival
Ocean Thermal Energy Conversion (OTEC) program. FY 1977 program summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1978-01-01
An overview is given of the ongoing research, development, and demonstration efforts. Each of the DOE's Ocean Thermal Energy Conversion projects funded during fiscal year 1977 (October 1, 1976 through September 30, 1977) is described and each project's status as of December 31, 1977 is reflected. These projects are grouped as follows: program support, definition planning, engineering development, engineering test and evaluation, and advanced research and technology. (MHR)
Federal Funding for Health Security in FY2018.
Watson, Crystal; Watson, Matthew; Kirk Sell, Tara
This article is the latest in an annual series analyzing federal funding for health security programs. It examines proposed funding in the President's Budget Request for FY2018 and provides updated amounts for FY2017 and actual funding for FY2010 through FY2016. The proposed FY2018 budget for health security-related programs represents a significant decrease in funding from prior years and previous administrations. In total, the President's proposed FY2018 budget includes $12.45 billion for health security-related programs, an estimated decrease in funding of $1.25 billion, or 9%, from the estimated $13.71 billion in FY2017 and an 11% decrease from the FY2016 actual funding level of $13.99 billion. Most FY2018 health security funding ($6.67 billion, 54%) would go to programs with multiple-hazard and preparedness goals and missions, representing a 14% decrease in this funding compared to FY2017. Radiological and nuclear security programs would receive 20% ($2.48 billion) of all health security funding, a slight decrease of 2% from the prior year. Biosecurity programs would be funded at $1.53 billion (12% of health security funding) in FY2018, a decrease of 6% compared to FY2017. Chemical security programs would represent 3% ($389.7 million) of all health security funding in FY2018, a 9% decrease from the prior year. Finally, 11% of health security funding ($1.39 billion) would be dedicated to pandemic influenza and emerging infectious diseases programs, the only category of funding to see an increase (3%) above FY2017.
75 FR 71669 - Sunshine Act Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-24
.... Approval of Agenda. II. Program Planning. Approval of School Choice, the Blaine Amendments and Anti.... Update on FY 2011 Cy Pres Enforcement Report. Update on Status of Briefing on Disparate Impact in School Discipline Policies. Update on Sex Discrimination in Liberal Arts College Admissions--Some of the discussion...
Defense Environmental Restoration Program Annual Report to Congress for Fiscal Year 1992.
1993-04-02
5. Eielson AFB , AK 24,336 159,535 6. Ellsworth AFB , SD 8,521 63,000 7. Elmendorf AFB , AK 23,227 107,263 8. Fairchild AFB (4 Waste Areas), WA 13,738...HRS Score (Latest) FY 92 FY 92 Status Year AIR FORCE (Continued) 7. Eielson AFB AK 48.14 92 7,055 14,799 FIN 91 8. Ellsworth AFB SD 33.62 91 690 7,831...decided at their October 7, 1992 cleanup decisions at Air Force meeting to recommend the use of . Andersen AFB , Guam installations. As part of the first
Single-Event Effects in Silicon Carbide Power Devices
NASA Technical Reports Server (NTRS)
Lauenstein, Jean-Marie; Casey, Megan C.; LaBel, Kenneth A.; Ikpe, Stanley; Topper, Alyson D.; Wilcox, Edward P.; Kim, Hak; Phan, Anthony M.
2015-01-01
This report summarizes the NASA Electronic Parts and Packaging Program Silicon Carbide Power Device Subtask efforts in FY15. Benefits of SiC are described and example NASA Programs and Projects desiring this technology are given. The current status of the radiation tolerance of silicon carbide power devices is given and paths forward in the effort to develop heavy-ion single-event effect hardened devices indicated.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoffnagle, Timothy L.; Hair, Don; Carmichael, Richard W.
2004-07-01
BPA Fish and Wildlife Program Project Number 1998-01-001 provides funding for the Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program. This report satisfies the requirement that an annual report be submitted for FY 2003. The Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Project is designed to rapidly increase numbers of salmon in stocks that are in imminent danger of extirpation. Parr are captured in Catherine Creek, upper Grande Ronde River and Lostine River and reared to adulthood in captivity. Upon maturation, these fish are spawned (within stocks) and their progeny reared to smoltification before being released into themore » natal stream of their parents. This program is co-managed by ODFW, National Marine Fisheries Service, Nez Perce Tribe and Confederated Tribes of the Umatilla Indian Reservation. This report covers activities conducted and provides data analyses for the Grande Ronde Spring Chinook Salmon Captive broodstock Program from 1 January--31 December 2003. Since the fiscal year ends in the middle of the spawning period, an annual report based on calendar year is more logical. This document is the FY 2003 annual report. Detailed information on historic and present population status, project background, goals and objectives, significance to regional programs and relationships to other programs, methods and previous results are available in the 1995-2002 Project Status Report (Hoffnagle et al 2003).« less
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
Wilkinson, Katie; Harris, Samantha; Gaur, Prashant; Haile, Askale; Armour, Rosalind; Teramura, Gayle; Delaney, Meghan
2012-02-01
Sickle cell disease (SCD) patients have dissimilar red blood cell (RBC) phenotypes compared to the primarily Caucasian blood donor base due, in part, to underlying complex Rh and silenced Duffy expression. Gene array-based technology offers high-throughput antigen typing of blood donors and can identify patients with altered genotypes. The purpose of the study was to ascertain if RBC components drawn from predominantly Caucasian donors could provide highly antigen-matched products for molecularly typed SCD patients. SCD patients were genotyped by a molecular array (HEA Beadchip, BioArray Solutions). The extended antigen phenotype (C, c, E, e, K, k, Jk(a) , Jk(b) , Fy(a) , Fy(b) , S, s) was used to query the inventory using different matching algorithms; the resulting number of products was recorded. A mean of 96.2 RBC products was available for each patient at basic-level, 34 at mid-level, and 16.3 at high-level stringency. The number of negative antigens correlated negatively with the number of available products. The Duffy silencing mutation in the promoter region (67T>C) (GATA) was found in 96.5% of patients. Allowing Fy(b+) products for patients with GATA increased the number of available products by up to 180%, although it does not ensure prevention of Duffy antibodies in all patients. This feasibility study provides evidence that centers with primarily Caucasian donors may be able to provide highly antigen-matched products. Knowledge of the GATA status expands the inventory of antigen-matched products. Further work is needed to determine the most clinically appropriate match level for SCD patients. © 2012 American Association of Blood Banks.
Federal funding for health security in FY2015.
Boddie, Crystal; Sell, Tara Kirk; Watson, Matthew
2014-01-01
Previous articles in this series have provided funding information for federal civilian biodefense programs and programs focused on radiological and nuclear preparedness and consequence management. This year the authors have expanded the focus of the analysis to US federal funding for health security. This article provides proposed funding amounts for FY2015, estimated amounts for FY2014, and actual amounts for FY2010 through FY2013 in 5 domains critical to health security: biodefense programs, radiological and nuclear programs, chemical programs, pandemic influenza and emerging infectious disease programs, and multiple-hazard and preparedness programs.
Defense Energy Support Center Fact Book, Fiscal Year 2002, Twenty-Fifth Edition
2002-01-01
767-9306 Director, Facilities Distribution Management (703) 767-9360 Director, Direct Delivery Fuels (703) 767-8500 Director, FAS Program (703) 767...FY02 SOURCE: FACILITIES AND DISTRIBUTION MANAGEMENT COMMODITY BUSINESS UNIT 24 MAINTENANCE, REPAIR, AND ENVIRONMENTAL COSTS MILLIONS OF DOLLARS...PROJECTED 0 20 40 60 80 100 120 140 160 180 200 220 240 260 93 94 95 96 97 98 99 00 01 02 03 SOURCE: FACILITIES AND DISTRIBUTION MANAGEMENT COMMODITY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marquis Childs; Ron Conrad
1998-10-01
Area Gin Technical Area 54, has been the principal facility at Los Alamos National Laboratory for the storage and disposal of low-level, solid mixed, and transuranic radioactive waste since 1957. Soil samples were analyzed for tritium, isotopic plutonium, americium-241, and cesium-137. Thirteen metals-silver, arsenic, barium, beryllium, cadmium, chromium, mercury, nickel, lead, antimony, selenium, thallium and zinc-were analyzed on filtered-sediment fractions of the single-stage samples using standard analytical chemistry techniques. During the two years of sampling discussed in this report elevated levels of tritium (as high as 716,000 pCi/L) in soil were found for sampling sites adjacent to the tritium burialmore » shafts located on the south- central perimeter of Area G. Additionally, tritium concentrations in soil as high as 38,300 pCi/L were detected adjacent to the TRU pads in the northeast comer of Area G. Plutonium-238 activities in FY96 soils ranged from 0.001-2.866 pCi/g, with an average concentration of 0.336& 0.734 pCdg. Pu-238 activities in FY97 soils ranged from 0.002-4.890 pCi/g, with an average concentration of 0.437 & 0.928 pCdg. Pu-239 activities in FY96 soils ranged from 0.009 to 1.62 pCdg, with an average of 0.177- 0.297 pCdg. Pu-239 activities in FY97 soils ranged from 0.005 to 1.71 pCi/g, with an average of 0.290- 0.415 pCi/g. The locations of elevated plutonium readings were consistent with the history of plutonium disposal at Area G. The two areas of elevated Am-241 activity reflected the elevated activities found for plutonium, the average values for Am-241 on soils were 0.6-2.07 pCi/g, and 0.10-0.14 pCi/g respectively for samples collected in FY96 and FY97. CS-137 activities in soils had average values of 0.33 pCi/g, and 0.28 pCi/g respectively for samples collected in FY96 and 97. There was no perimeter area where soil concentrations of CS-137 were significantly elevated.« less
Federal Funding for Health Security in FY2015
Sell, Tara Kirk; Watson, Matthew
2014-01-01
Previous articles in this series have provided funding information for federal civilian biodefense programs and programs focused on radiological and nuclear preparedness and consequence management. This year the authors have expanded the focus of the analysis to US federal funding for health security. This article provides proposed funding amounts for FY2015, estimated amounts for FY2014, and actual amounts for FY2010 through FY2013 in 5 domains critical to health security: biodefense programs, radiological and nuclear programs, chemical programs, pandemic influenza and emerging infectious disease programs, and multiple-hazard and preparedness programs. PMID:24988432
A Multi-Year Budget Generation Program for Use in Navy Recruiting: A Users’ Manual,
1981-10-01
251,069 for FY79 Monthly Unemploy- ment rate Oct. 78 6.48% 5.56 4.90 4.01 4.45 5.54 Nov. 78 6.25 5.14 6.31 4.13 4.96 5.82 De . 78 6.06 5.28 5.42 4.50...attrition factors), ALPHA (the elasticities for recruiters and the two types of advertising for 3 months), B (the elasticities for the 8 de /mographics...I 121 1 01 io~a! M -P. I II uA *--a W Q4M~IN-a~f a.0 M *CIO I t I’’ .i A 4a .81 it W * D. or 00W4 ŕ .1 2 de Q. r. ry, fy~- 01;4 : 46A am! 1 44 Me 0
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-08
...: Centers for Medicare & Medicaid Services (CMS), HHS. ACTION: Proposed rule. SUMMARY: This proposed rule..., especially the teaching status adjustment factor. Therefore, we implemented a 3-year moving average approach... moving average to calculate the facility-level adjustment factors. For FY 2011, we issued a notice to...
77 FR 44222 - Inland Waterways Users Board
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-27
...: August 29, 2012. Location: The Sheraton St. Louis City Center Hotel and Suites, 400 South 14th Street, St... status for Fiscal Year (FY) 2012 and the FY 2013 budget, status of the Olmsted Locks and Dam Project, and...
2007-04-01
Separation The first method used to enrich uranium on a significant scale was developed by the United States as part of the Manhattan Project during...there does not seem to be a easy way to enrich uranium. It has been over 60 years since the 33 Manhattan Project successfully enriched U-235 to...Proliferation, 91-3. 14 The cost of $5B dollars is adjusted to FY96 dollars. Brookings Institution, “The Costs of the Manhattan Project ,” Global Politics
[Application of melting curve to analyze genotype of Duffy blood group antigen Fy-a/b].
Chen, Xue; Zhou, Chang-Hua; Hong, Ying; Gong, Tian-Xiang
2012-12-01
This study was aimed to establish the real-time multiple-PCR with melting curve analysis for Duffy blood group Fy-a/b genotyping. According to the sequence of mRNA coding for β-actin and Fy-a/b, the primers of β-actin and Fy-a/b were synthesized. The real-time multiple-PCR with melting curve analysis for Fy-a/b genotyping was established. The Fy-a/b genotyping of 198 blood donors in Chinese Chengdu area has been investigated by melting curve analysis and PCR-SSP. The results showed that the results of Fy-a/b genotype by melting curve analysis were consistent with PCR-SSP. In all of 198 donors in Chinese Chengdu, 178 were Fy(a) (+) (89.9%), 19 were Fy(a) (+) Fy(b) (+) (9.6%), and 1 was Fy(b) (+) (0.5%). The gene frequency of Fy(a) was 0.947, while that of Fy(b) was 0.053. It is concluded that the genotyping method of Duffy blood group with melting curve analysis is established, which can be used as a high-throughput screening tool for Duffy blood group genotyping; and the Fy(a) genotype is the major of Duffy blood group of donors in Chinese Chengdu area.
NASA Technical Reports Server (NTRS)
Bales, Kay S.
1990-01-01
The Objectives, FY 1990 Plans, Approach, and FY 1990 Milestones for the Structural Mechanics Division's research programs are presented. FY 1989 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Bales, K. S.
1986-01-01
Presented are the Objectives, FY 1986 Plans, Approach, and FY 1986 Milestones for the Structures and Dynamics Division's research programs. FY 1985 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.
SAVY-4000 Surveillance and Life Extension Program Fiscal Year 2013 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stone, Timothy A.; Blair, Michael W.; Weis, Eric
2014-03-03
The Packaging Surveillance Program section of the DOE M441.1-1 /sup>1, Nuclear Material Packaging Manual (DOE, 2008) requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” In order to ensure continuing safe storage of nuclear material and the maximization of risk reduction, TA-55 has established a Surveillance Program to ensure storage container integrity for operations within its specified design life. The LANL SAVY-4000 Field Surveillance Plan2 defines the near-term field surveillance plan for SAVY-4000 containers as required by the Manual. A long-term surveillance planmore » will be established based on the results of the first several years of surveillance and the results of the lifetime extension studies as defined in the Accelerated Aging Plan3. This report details progress in positioning the Surveillance Program for successful implementation in FY14 and status of the Design Life Extension Program in terms of its implementation and data collection for FY13.« less
Satellite Power System (SPS) FY 79 program summary
NASA Technical Reports Server (NTRS)
1980-01-01
The Satellite Power System (SPS) program a joint effort to develop an initial understanding of the technical feasibility, the economic practicality, and the social and environmental acceptability of the SPS concept is discussed. This is being accomplished through implementation of the Concept Development and Evaluation Program Plan which is scheduled for completion by the end of FY 1980. This Program Summary not only covers FY 1979 but includes work completed in FY 1977 and FY 1978 in order to give a comprehensive picture of the DOE involvement in the SPS concept development and evaluation process.
NASA Technical Reports Server (NTRS)
Bales, Kay S.
1988-01-01
Presented are the Objectives, FY 1988 Plans, Approach, and FY 1988 Milestones for the Structures and Dynamics Division (Langley Research Center) research programs. FY 1987 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Bales, Kay S.
1987-01-01
This paper presents the Objectives, FY 1987 Plans, Approach, and FY 1987 Milestones for the Structures and Dynamics Division's research programs. FY 1986 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Bales, K. S.
1985-01-01
The objectives, FY 1985 plans, approach, and FY 1985 milestones for the Structures and Dynamics Division's research programs are presented. The FY 1984 accomplishments are presented where applicable. This information is useful in program coordination with other government organizations in areas of mutual interest.
Environmental Programs: Status of Work and Current Priorities for FY13
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jones, Patricia
2012-08-17
Presentation outline is: Mission/overview, Regulatory framework, Current status of cleanup, Shift in priorities to address highest risk, Removal of above-ground waste, Continued focus on protecting water resources, and Priorities for fiscal year 2013. LANL's Environmental Mission is to: (1) Repack and ship legacy transuranic waste containers; (2) Investigate and remediate Cold War (legacy) hazardous and radioactive waste areas; (3) Demolish unused buildings; (4) Disposition solid waste from Laboratory operations; and (5) Lifecycle cost nearly $3 billion.
Statistics and Epidemiology of Lead Poisoning (FY 72-L1).
ERIC Educational Resources Information Center
Morrison, John H., Jr.; And Others
This report is the first in a quarterly series which will contain statistics and epidemiologic notes on lead poisoning at both the national and local levels. This report contains (a) statistics on childhood lead poisoning; (b) a status report on the Community Lead Poisoning Data System, which was designed to assist local lead control programs and…
Solar Thermal Power Systems parabolic dish project
NASA Technical Reports Server (NTRS)
Truscello, V. C.
1981-01-01
The status of the Solar Thermal Power Systems Project for FY 1980 is summarized. Included is: a discussion of the project's goals, program structure, and progress in parabolic dish technology. Analyses and test results of concentrators, receivers, and power converters are discussed. Progress toward the objectives of technology feasibility, technology readiness, system feasibility, and system readiness are covered.
Enhanced surveillance program FY97 accomplishments. Progress report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mauzy, A.; Laake, B.
1997-10-01
This annual report is one volume of the Enhanced Surveillance Program (ESP) FY97 Accomplishments. The complete accomplishments report consists of 11 volumes. Volume 1 includes an ESP overview and a summary of selected unclassified FY97 program highlights. Volume 1 specifically targets a general audience, reflecting about half of the tasks conducted in FY97 and emphasizing key program accomplishments and contributions. The remaining volumes of the accomplishments report are classified, organized by program focus area, and present in technical detail the progress achieved in each of the 104 FY97 program tasks. Focus areas are as follows: pits; high explosives; organics; dynamics;more » diagnostics; systems; secondaries; nonnuclear materials; nonnuclear components; and Surveillance Test Program upgrades.« less
FY 1998 Proposed Rail Improvement Program Supplement
DOT National Transportation Integrated Search
1997-01-01
This FY 1998 Proposed Rail Improvement Program Supplement contains those rail plan amendments which have been published subsequent to the FY 1997 Proposed Rail Improvement program supplement. This document also contains the benefit/cost methodology u...
The NASA/DOE/DOD nuclear rocket propulsion project - FY 1991 status
NASA Technical Reports Server (NTRS)
Clark, John S.; Miller, Thomas J.
1991-01-01
NASA has initiated planning and critical technology development for nuclear rocket propulsion systems for Space Exploration Initiative missions to the moon and to Mars. Interagency agreements are being negotiated between NASA, the Department of Energy, and the Department of Defense for joint technology development activities. This paper summarizes the activities of the NASA project planning team in FY 1990 that led to the draft Nuclear Propulsion Project Plan, outlines the FY 1991 Interagency activities, and describes the current status of the project plan.
78 FR 17281 - Notice of Public Meeting on FY 2014 U.S. Refugee Admissions Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-20
... DEPARTMENT OF STATE [Public Notice 8241] Notice of Public Meeting on FY 2014 U.S. Refugee Admissions Program There will be a meeting on the President's FY 2014 U.S. Refugee Admissions Program on... meeting's purpose is to hear the views of attendees on the appropriate size and scope of the FY 2014 U.S...
76 FR 71498 - Periodic Reporting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-18
... methodological changes approved in Proposal Twelve. Id. at 14. These methodological changes include the use of... study and models for Return Receipt service were developed in 1976 and updated in Docket Nos. MC96-3, R2000-1, and R2001-1. Id. \\7\\ Id. at 21; Docket No. ACR2010, USPS-FY10-28, FY 2010 Special Cost Studies...
Information Technology Resources Assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-04-01
The Information Technology Resources Assessment (ITRA) is being published as a companion document to the Department of Energy (DOE) FY 1994--FY 1998 Information Resources Management Long-Range Plan. This document represents a collaborative effort between the Office of Information Resources Management and the Office of Energy Research that was undertaken to achieve, in part, the Technology Strategic Objective of IRM Vision 21. An integral part of this objective, technology forecasting provides an understanding of the information technology horizon and presents a perspective and focus on technologies of particular interest to DOE program activities. Specifically, this document provides site planners with anmore » overview of the status and use of new information technology for their planning consideration.« less
Early Results from NASA's Assessment of Satellite Servicing
NASA Technical Reports Server (NTRS)
Thronson, Harley A.; Reed, Benjamin B.; Townsend, Jacqueline A.; Ahmed, Mansoor; Whipple, Arthur O.; Oegerle, William R.
2010-01-01
Following recommendations by the NRC, NASA's FY 2008 Authorization Act and the FY 2009 and 2010 Appropriations bills directed NASA to assess the use of the human spaceflight architecture to service existing/future observatory-class scientific spacecraft. This interest in satellite servicing, with astronauts and/or with robots, reflects the success that NASA achieved with the Shuttle program and HST on behalf of the astronomical community as well as the successful construction of ISS. This study, led by NASA GSFC, will last about a year, leading to a final report to NASA and Congress in autumn 2010. We will report on its status, results from our March satellite servicing workshop, and recent concepts for serviceable scientific missions.
National Water Program FY 2015 Performance, Trends and Best Practices Report
This Report includes final FY 2015 performance data for all U.S. Environmental Protection Agency (EPA) National Water Program measures included in EPA's 2014-2018 Strategic Plan and the FY 2015 National Water Program Guidance Addendum.
National Water Program Performance FY 2017 Trends, and Best Practices Report
This report includes FY 2017 performance data for all U.S. Environmental Protection Agency (EPA) National Water Program measures included in EPA's 2014-2018 Strategic Plan and the FY 2016-2017 National Water Program Guidance.
Biological and Environmental Research Program at Oak Ridge National Laboratory, FY 1992--1994
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report is the 1992--1994 Program Director's Overview Report for Oak Ridge National Laboratory's (ORNL's) Biological and Environmental Research (BER) Program, and as such it addresses KP-funded work at ORNL conducted during FY 1991 and in progress during FY 1992; it also serves as a planning document for the remainder of FY 1992 through FY 1994. Non-BER funded work at ORNL relevant to the mission of OHER is also discussed. The second section of the report describes ORNL facilities and resources used by the BER program. The third section addresses research management practices at ORNL. The fourth, fifth, and sixthmore » sections address BER-funded research in progress, program accomplishments and research highlights, and program orientation for the remainder of FY 1992 through FY 1994, respectively. Work for non-BER sponsors is described in the seventh section, followed by a discussion of significant near and long-term issues facing BER work at ORNL in the eighth section. The last section provides a statistical summary of BER research at ORNL. Appendices supplement the above topics with additional detail.« less
1996-05-01
Systems 17 Motion Bases Upgraded Aero Misc > Contact Info • AMC, Lt Col Letica , Phone (618) 256-5696 L8 Upgrade Flow Plan Advance Planning Briefing...Projected Schedule: FY 05 > Requirement Document: AMMP >• Projected Program Size: ? < $40M > Funding Status/Stability: > POCs: • AMC, Lt Col Letica
NASA Technical Reports Server (NTRS)
Yeh, H. Y. Jannivine; Brown, Cheryl B.; Jeng, Frank F.; Anderson, Molly; Ewert, Michael K.
2009-01-01
The development of the Advanced Life Support (ALS) Sizing Analysis Tool (ALSSAT) using Microsoft(Registered TradeMark) Excel was initiated by the Crew and Thermal Systems Division (CTSD) of Johnson Space Center (JSC) in 1997 to support the ALS and Exploration Offices in Environmental Control and Life Support System (ECLSS) design and studies. It aids the user in performing detailed sizing of the ECLSS for different combinations of the Exploration Life support (ELS) regenerative system technologies. This analysis tool will assist the user in performing ECLSS preliminary design and trade studies as well as system optimization efficiently and economically. The latest ALSSAT related publication in ICES 2004 detailed ALSSAT s development status including the completion of all six ELS Subsystems (ELSS), namely, the Air Management Subsystem, the Biomass Subsystem, the Food Management Subsystem, the Solid Waste Management Subsystem, the Water Management Subsystem, and the Thermal Control Subsystem and two external interfaces, including the Extravehicular Activity and the Human Accommodations. Since 2004, many more regenerative technologies in the ELSS were implemented into ALSSAT. ALSSAT has also been used for the ELS Research and Technology Development Metric Calculation for FY02 thru FY06. It was also used to conduct the Lunar Outpost Metric calculation for FY08 and was integrated as part of a Habitat Model developed at Langley Research Center to support the Constellation program. This paper will give an update on the analysis tool s current development status as well as present the analytical results of one of the trade studies that was performed.
NASA Technical Reports Server (NTRS)
Bales, Kay S.
1989-01-01
The Objectives, FY 1989 Plans, Approach, and FY 1989 Milestones for the Structural Mechanics Division's research programs are presented. Fiscal year 1988 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.
Evaluation of Recommended Improvements to the Family Housing Self-Help Program
1987-09-01
FY96 EST. EST. TASK LABOR TASK LABOR :OOPL. COST COMPL. COST ITM OCCURRENCES TIME AVCIDED OCCJRFENCES TIME AVOIDED FRACkE T, C 0 I 1 150 WIRE, FABRIC...InSuLatinq blankets on hot water heater AS i. ;Ieed radiator RG Si. identify 3no report suspected gas *;eaks RU FO 6). qelll~t pi~ot lights RU RU 101 A1...VII Corps ATTN: German Liaison Off icer ATTN: DEN (15) ATTN: Water Resources Support Ctr 21s, Support Command ATTN: Engr Studies Center ATTN: OEM (12
The School Staffing Surge: Decades of Employment Growth in America's Public Schools. Part II
ERIC Educational Resources Information Center
Scafidi, Benjamin
2013-01-01
America's K-12 public education system has experienced tremendous historical growth in employment, according to the U.S. Department of Education's National Center for Education Statistics. Between fiscal year (FY) 1950 and FY 2009, the number of K-12 public school students in the United States increased by 96 percent, while the number of full-time…
United States Nuclear Data Program (USNDP)
Report FY 2016 Annual Report FY 2015 Annual Report FY 2014 Annual Report FY 2013 Annual Report FY 2012 Annual Report FY 2011 Annual Report FY 2010 Annual Report FY 2009 Annual Report FY 2008 Annual Report FY 2007 Annual Report FY 2006 Annual Report FY 2005 Annual Report FY 2004 Final Report FY 2003 Final
Wind Powering America Anemometer Loan Program: A Retrospective
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jimenez, T.
This white paper details the history, mechanics, status, and impact of the Native American Anemometer Loan Program (ALP) conducted by the U.S. Department of Energy's Wind Powering America (WPA) initiative. Originally conceived in 2000 and terminated (as a WPA activity) at the end of FY 2011, the ALP has resulted in the installation of anemometers at 90 locations. In addition, the ALP provided support for the installation of anemometers at 38 additional locations under a related ALP administered by the Western Area Power Administration.
76 FR 35918 - Susan Harwood Training Grant Program, FY 2011
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-20
... DEPARTMENT OF LABOR Occupational Safety and Health Administration Susan Harwood Training Grant... Funding Opportunity for Susan Harwood Training Grant Program, FY 2011. Funding Opportunity No.: SHTG-FY-11... of approximately $4.7 million for Susan Harwood Training Program grants under the following...
75 FR 29783 - Susan Harwood Training Grant Program, FY 2010
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-27
... DEPARTMENT OF LABOR Occupational Safety and Health Administration Susan Harwood Training Grant... Funding Opportunity for Susan Harwood Training Grant Program, FY 2010. Funding Opportunity No.: SHTG-FY-10... availability of approximately $8 million for the Susan Harwood Training Grant Program for Capacity Building...
75 FR 38837 - Susan Harwood Training Grant Program, FY 2010
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-06
... DEPARTMENT OF LABOR Occupational Safety and Health Administration Susan Harwood Training Grant... Funding Opportunity for Susan Harwood Training Grant Program, FY 2010. Funding Opportunity No.: SHTG-FY-10... availability of approximately $2.75 million for the Susan Harwood Training Grant Program for Targeted Topic...
Analysis of Rotary Aircraft Alternatives for NATO SOF Organic Air Wing
2012-06-01
analysis with an assumed program start in 2013 and an end in 2019 to determine the impact of short program duration on platform selection. D...FY12 GO\\ LR,~itl\\ l Sli LABOR H13 (J()VI R\\\\iFI\\TSE I AROR FY14 GOVLR\\\\iLI\\ I Sl:. LABOR H15 SI:.PO CSS FY II SII’O CSS FY 12 SEI’() CSS fY 13
77 FR 5617 - Alternative Transportation in Parks and Public Lands Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-03
... selection of projects, funded with Fiscal Year (FY) 2011 and 2012 appropriations, and previously unallocated... Program FY 2011 FY 2012 Appropriation $26,844,035 $13,450,000 Oversight Deduction (0.5%) (134,500) (67,530... the program are to conserve natural, historical, and cultural resources; reduce congestion and...
2014-08-05
This final rule updates the payment rates used under the prospective payment system (PPS) for skilled nursing facilities (SNFs) for fiscal year (FY) 2015. In addition, it adopts the most recent Office of Management and Budget (OMB) statistical area delineations to identify a facility's urban or rural status for the purpose of determining which set of rate tables will apply to the facility, and to determine the SNF PPS wage index including a 1-year transition with a blended wage index for all providers for FY 2015. This final rule also contains a revision to policies related to the Change of Therapy (COT) Other Medicare Required Assessment (OMRA). This final rule includes a discussion of a provision related to the Affordable Care Act involving Civil Money Penalties. Finally, this final rule discusses the SNF therapy payment research currently underway within CMS, observed trends related to therapy utilization among SNF providers, and the agency's commitment to accelerating health information exchange in SNFs.
FY 2011 Educational Facilities Master Plan & the FY 2011-2016 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2010
2010-01-01
The FY 2011 Educational Facilities Master Plan (Master Plan) and FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…
An Assessment of Operational Energy Capability Improvement Fund (OECIF) Programs 17-S-2544
2017-09-19
persistently attack key operational energy problems . OECIF themes are summarized in Table 1, and Appendix A includes more detail on the programs within... problems FY 2014 Analytical methods and tools FY 2015 Improving fuel economy for the current tactical ground fleet FY 2016 Increasing the operational...involve a variety of organizations to solve operational energy problems . In FY 2015, the OECIF program received a one-time $14.1M Congressional plus-up
Clinical Investigation Program RCS MED-300 (R1).
1985-09-30
of Group A Streptococcus ......................................... 193 Work Unit No. 85/17 (FY85,T) Serological Survey of Epstein - Barr Virus ...Prot No: 85/17 Status: Terminated Title: Serological Survey of Epstein - Barr Virus Infections Followed Over a 12-Month Period Start Date: Est Comp Date...Principal Investigator: Facility: CPT C.A. Borchert, MC Dept/Sec: Pediatrics Assoc Investigators Key Words: Epstein - Barr Virus Accumulative MEDCASE Est
1985-01-01
equipped with data collection platforms (DCP) by the end of FY 1985. (b) Communication. The DCP’s transmit the remote gaging station data over the...activated 78 platforms in FY 84 bringing the total number of operating stations to 85. Plans are to activate seven more platforms in FY 85. c. Acoustic... Platforms . The total program cost for FY 1984 is shown in Table VI-3. The total program cost for FY 1985 will be $172,720. (2) National Weather Service
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
NREL's Site Sustainability Plan FY 2015 reports on sustainability plans for the lab for the year 2015 based on Executive Order Goals and provides the status on planned actions cited in the FY 2014 report.
U.S. Department of Education FY 2010 Annual Performance Report
ERIC Educational Resources Information Center
US Department of Education, 2011
2011-01-01
This paper presents the U.S. Department of Education's Fiscal Year (FY) "2010 Annual Performance Report" (APR). This report provides detailed information on: (1) the status of strategic goals, and (2) the outcomes of the strategic performance measures identified in the Department's "FY 2007-2012 Strategic Plan" and updated previously in the "FY…
76 FR 23272 - FY 2011 Emergency Food Assistance Annual Program Statement
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-26
... Emergency Food Assistance Annual Program Statement Pursuant to the Food for Peace Act of 2008 and the Foreign Assistance Act of 1961 (FAA), notice is hereby given that the FY 2011 Emergency Food Assistance... to review, the FY 2011 Emergency Food Assistance Annual Program Statement is available via the Food...
Materials Division research and technology accomplishments for FY 87 and plans for FY 88
NASA Technical Reports Server (NTRS)
Brinkley, Kay L.
1988-01-01
The research program of the Materials Division is presented as FY 87 accomplishments and FY 88 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material will be useful in program coordination with other government organizations, universities, and industries in areas of mutual interest.
FY 2013 Educational Facilities Master Plan and the FY 2013-2018 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2012
2012-01-01
The FY 2013 Educational Facilities Master Plan (Master Plan) and the FY 2013-2018 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of…
FY 2012 Educational Facilities Master Plan and the Amended FY 2011-2016 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2011
2011-01-01
The FY 2012 Educational Facilities Master Plan (Master Plan) and Amendments to the FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the…
Materials Division research and technology accomplishments for FY 89 and plans for FY 90
NASA Technical Reports Server (NTRS)
Brinkley, Kay L.
1990-01-01
The research program of the Materials Division is presented as FY-89 accomplishments and FY-90 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material will be useful in program coordination with other government organizations, universities, and industries in areas of mutual interest.
FY 2007 Educational Facilities Master Plan and the FY 2007-2012 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2006
2006-01-01
The FY 2007 Educational Facilities Master Plan (Master Plan) and FY 2007-2012 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…
Materials Division research and technical accomplishments for FY 1988 and plans for FY 1989
NASA Technical Reports Server (NTRS)
Brinkley, Kay L.
1989-01-01
The research program of the Materials Division is presented as FY-88 accomplishments and FY-89 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material is useful in program coordination with other government organizations, universities, and industry in areas of mutual interest.
NASA earth science and applications division: The program and plans for FY 1988-1989-1990
NASA Technical Reports Server (NTRS)
1988-01-01
Described here are the Division's research goals, priorities and emphases for the next several years and an outline of longer term plans. Included are highlights of recent accomplishments, current activities in FY 1988, research emphases in FY 1989, and longer term future plans. Data and information systems, the Geodynamics Program, the Land Processes Program, the Oceanic Processes Program, the Atmospheric Dynamics and Radiation Program, the Atmospheric Chemistry Program, and space flight programs are among the topic covered.
2017-08-14
We are revising the Medicare hospital inpatient prospective payment systems (IPPS) for operating and capital-related costs of acute care hospitals to implement changes arising from our continuing experience with these systems for FY 2018. Some of these changes implement certain statutory provisions contained in the Pathway for Sustainable Growth Rate (SGR) Reform Act of 2013, the Improving Medicare Post-Acute Care Transformation Act of 2014, the Medicare Access and CHIP Reauthorization Act of 2015, the 21st Century Cures Act, and other legislation. We also are making changes relating to the provider-based status of Indian Health Service (IHS) and Tribal facilities and organizations and to the low-volume hospital payment adjustment for hospitals operated by the IHS or a Tribe. In addition, we are providing the market basket update that will apply to the rate-of-increase limits for certain hospitals excluded from the IPPS that are paid on a reasonable cost basis subject to these limits for FY 2018. We are updating the payment policies and the annual payment rates for the Medicare prospective payment system (PPS) for inpatient hospital services provided by long-term care hospitals (LTCHs) for FY 2018. In addition, we are establishing new requirements or revising existing requirements for quality reporting by specific Medicare providers (acute care hospitals, PPS-exempt cancer hospitals, LTCHs, and inpatient psychiatric facilities). We also are establishing new requirements or revising existing requirements for eligible professionals (EPs), eligible hospitals, and critical access hospitals (CAHs) participating in the Medicare and Medicaid Electronic Health Record (EHR) Incentive Programs. We are updating policies relating to the Hospital Value-Based Purchasing (VBP) Program, the Hospital Readmissions Reduction Program, and the Hospital-Acquired Condition (HAC) Reduction Program. We also are making changes relating to transparency of accrediting organization survey reports and plans of correction of providers and suppliers; electronic signature and electronic submission of the Certification and Settlement Summary page of the Medicare cost reports; and clarification of provider disposal of assets.
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-23
... charges fees to designated contract markets and registered futures associations to recover the costs..., as explained below. The FY 2010 fee includes adjustments to program costs incurred in FY 2008 and 2009, which are being revised as a result of an internal review of program costs. The FY 2010 fee...
1996-12-27
consolidated financial statements for FY 1996. The Office of Civilian Health and Medical Program of the Uniformed Services (OCHAMPUS), part of the FY 1995...12.3 billion Defense Health Program, is one of the entities that DoD will include in its FY 1996 consolidated financial statements . The OCHAMPUS
ERIC Educational Resources Information Center
Alliance for Excellent Education, 2006
2006-01-01
This document presents a chart titled "Selected Federal Education Programs That Can Help Middle and High School Students Get an Excellent Education." It divides into five columns: (1) "No Child Left Behind" Programs (and Other Reauthorizations); (2) FY 2006 Final Appropriation; (3) FY 2007 Bush Budget; (4) FY 2007 House…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gill, D.H.
1997-01-01
The National Teacher Enhancement program (NTEP) is a three-year, multi-laboratory effort funded by the National Science Foundation and the Department of Energy to improve elementary school science programs. The Los Alamos National Laboratory targets teachers in northern New Mexico. FY96, the third year of the program, involved 11 teams of elementary school teachers (grades 4-6) in a three-week summer session, four two-day workshops during the school year and an on-going planning and implementation process. The teams included twenty-one teachers from 11 schools. Participants earned a possible six semester hours of graduate credit for the summer institute and two hours formore » the academic year workshops from the University of New Mexico. The Laboratory expertise in the earth and environmental science provided the tie between the Laboratory initiatives and program content, and allowed for the design of real world problems.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... Federal share) IMD and other mental health facility DSH expenditures applicable to the State's FY 1995 DSH... State's total computable DSH expenditures attributable to the FY 1995 DSH allotment for mental health... DSH expenditures (mental health facility plus inpatient hospital) applicable to the FY 1995 DSH...
Mission and status of the US Department of Energy's battery energy storage program
NASA Astrophysics Data System (ADS)
Quinn, J. E.; Hurwitch, J. W.; Landgrebe, A. R.; Hauser, S. G.
1985-05-01
The mission of the US Department of Energy's battery research program has evolved to reflect the changing conditions of the world energy economy and the national energy policy. The battery energy storage program supports the goals of the National Energy Policy Plan (FY 1984). The goals are to provide an adequate supply of energy at reasonable costs, minimize federal control and involvement in the energy marketplace, promote a balanced and mixed energy resource system, and facilitate technology transfer from the public to the private sector. This paper describes the history of the battery energy storage program and its relevance to the national interest. Potential market applications for battery energy storage are reviewed, and each technology, its goals, and its current technical status are described. The paper concludes by describing the strategy developed to ensure effective technology transfer to the private sector and reviewing past significant accomplishments.
Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration. Division of Fish and Wildlife.
1988-11-01
The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or moremore » BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-22
...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2009 HOPE VI Main Street Grants Program... posted its HOPE VI Main Street Grants program NOFA for FY2009 (``NOFA''). The NOFA makes available approximately $4 million in assistance for the HOPE VI Main Street Grants program, which was funded through the...
1980-01-01
S a 0= ae A CaAD i-oa IdO~a~a C34 A- C 4J g. aUaU -~ I " a~ .LIU f% d 0) v00- vdi I .4.sC. -C~ j -J 5 I la-us *- qwe s C,0AJ . .I M. 0 - 1. a 4a 4j t...4.48.4 a84 4 - H )4484 4 40 ’C > ~ Al 4804 0 96a c l m t " 0 48 .4 J 8 4 Is 1548ൈ . 4 4 84J08.4 4.. Q. 008 4.4w8DoG I = 48 (j.~ 4j2 a0 2048 .. 4 a
Ettner, Susan L; Johnson, Steven
2003-01-01
The adequacy of risk adjustment to eliminate incentives for managed care organizations (MCOs) to avoid enrolling costly patients had been questioned. This study explored systematic differences in expenditures between beneficiaries with and without substance disorders assigned to the same capitation rate group under the Maryland Medicaid HealthChoice program. The investigators used fiscal year (FY) 1995 to 1997 Medicaid data to assign beneficiaries to rate cells based on FY 1995 diagnoses and compared the distribution of expenditures for beneficiaries with and without substance disorders, defined using FY 1997 and FY 1995 diagnoses. Results showed that differences in FY 1997 expenditures between beneficiaries with and without FY 1995 substance disorders were negligible. However, MCOs could expect greater average losses and lower average profits on beneficiaries with FY 1997 substance disorders. Thus, the adjusted clinical groups methodology used to adjust capitation payments in the HealthChoice program attenuated, but did not eliminate, financial incentives for MCOs to avoid substance abusers.
The U.S. Geological Survey Federal-State Cooperative Water-Resources Program, fiscal year 1986
Gilbert, B.K.; Mann, W.B.
1987-01-01
The U.S. Geological Survey 's Federal-State Cooperative Water Resources Program has been in operation for 91 years as of fiscal year (FY) 1986. Hydrologic data collection and interpretive investigations are underway in every State, Puerto Rico, and several territories in cooperation with more than 900 State, regional and local agencies. Federal funds amounted to $49.8 million in this 50-50 matching activity. Total funding was about $106 million, which included $6.9 million furnished by cooperating agencies on an unmatched basis. The Cooperative Program comprised more than 40% of the overall FY 1986 budget of the Survey 's Water Resources Division. The areas of principal emphasis during the year included groundwater contamination, stream quality, water supply and demand, and hydrologic hazards. Information is presented on program priorities and investigations implemented under the merit proposal process. The status of water use information activities, which are being carried out in 48 states and Puerto Rico is reviewed briefly. Standard methods for collecting the data are being developed. Each state has a computerized State Water-Use Data System for storage and retrieval of water-use data for individual users or facilities. (Lantz-PTT)
Nevada Test Site-Directed Research, Development, and Demonstration. FY2005 report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Will
2006-09-01
The Nevada Test Site-Directed Research, Development, and Demonstration (SDRD) program completed a very successful year of research and development activities in FY 2005. Fifty new projects were selected for funding this year, and five FY 2004 projects were brought to conclusion. The total funds expended by the SDRD program were $5.4 million, for an average per project cost of just under $100,000. Two external audits of SDRD accounting practices were conducted in FY 2005. Both audits found the program's accounting practices consistent with the requirements of DOE Order 413.2A, and one included the observation that the NTS contractor ''did anmore » exceptional job in planning and executing year-start activities.'' Highlights for the year included: the filing of 18 invention disclosures for intellectual property generated by FY 2005 projects; programmatic adoption of 17 FY 2004 SDRD-developed technologies; participation in the tri-lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2005 projects; and the successful completion of 55 R&D projects, as presented in this report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Appel, Gordon John
Sandia National Laboratories (SNL) Fuel Cycle Technologies (FCT) program activities are conducted in accordance with FCT Quality Assurance Program Document (FCT-QAPD) requirements. The FCT-QAPD interfaces with SNL approved Quality Assurance Program Description (SNL-QAPD) as explained in the Sandia National Laboratories QA Program Interface Document for FCT Activities (Interface Document). This plan describes SNL's FY16 assessment of SNL's FY15 FCT M2 milestone deliverable's compliance with program QA requirements, including SNL R&A requirements. The assessment is intended to confirm that SNL's FY15 milestone deliverables contain the appropriate authenticated review documentation and that there is a copy marked with SNL R&A numbers.
The America Supports You Program
2008-12-12
Federal Acquisition Regulation Part 31 and appropriation laws. (finding C). The American Forces Information Service, working under the authority...adequacy of program funding in the FY 2007-2009 [sic] as submitted in the American Forces Information Service budget estimate submission. The ASD (PA) in...From FY 2005 through FY 2007, the ASY program received $9.2 million of appropriated funds from American Forces Information Service (AFIS) and from the
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2007-03-01
This document summarizes the results of the benefits analysis of EERE's programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and for each of its nine Research, Development, Demonstration, and Deployment (RD3) programs. Benefits for the FY 2008 budget request are estimated for the midterm (2008-2030) and long term (2030-2050).
Projects #OPE-FY14-0004, OPE-FY14-0005 and OPE-FY14-0006, October 30, 2013. The EPA OIG plans to begin preliminary research on October 30, 2013 into the environmental programs the US Virgin Islands (USVI) has implemented on EPA’s behalf.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-05
... of accredited institutions of higher education for FY 2010 University Center Economic Development..., preparing American regions for growth and success in the worldwide economy. Institutions of higher education... of higher education. For FY 2010, the University Center Economic Development Program competition is...
NASA Technical Reports Server (NTRS)
Bales, K. S.
1984-01-01
The Objectives, Expected Results, Approach, and Fiscal Year FY 1984 Milestones for the Structures and Dynamics Division's research programs are examined. The FY 1983 Accomplishments are presented where applicable.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-23
...For 60-month projects funded in fiscal year (FY) 2007 under the Tribally Controlled Postsecondary Career and Technical Institutions Program (TCPCTIP), the Secretary waives 34 CFR 75.250 and 75.261(c)(2) in order to extend the project period of these current TCPCTIP grantees through FY 2013, or longer, if Congress continues to appropriate funds under the existing TCPCTIP program authority. This action will enable the two current TCPCTIP grantees to seek continuation awards in FY 2012 for their current projects, and we will not announce a new TCPCTIP competition in FY 2012.
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
2017-03-21
the 75th and 76th ships in the class. The 10 DDG-51s programmed for procurement in FY2013-FY2017 (in annual quantities of 3-1-2-2-2) are being...procured under the 10- ship MYP contract for FY2013-FY2017. The Navy, in its budget submission, notes this additional $1 billion in funding for the DDG...two DDG-51s requested for procurement in FY2017 at $3,393.9 million. The ships have received a total of $182.6 million in prior-year advance procurement
Materials science on parabolic aircraft: The FY 1987-1989 KC-135 microgravity test program
NASA Technical Reports Server (NTRS)
Curreri, Peter A. (Editor)
1993-01-01
This document covers research results from the KC-135 Materials Science Program managed by MSFC for the period FY87 through FY89. It follows the previous NASA Technical Memorandum for FY84-86 published in August 1988. This volume contains over 30 reports grouped into eight subject areas covering acceleration levels, space flight hardware, transport and interfacial studies, thermodynamics, containerless processing, welding, melt/crucible interactions, and directional solidification. The KC-135 materials science experiments during FY87-89 accomplished direct science, preparation for space flight experiments, and justification for new experiments in orbit.
2013-11-29
veterans in general (8.7% in 2010).25 • Both male and female veterans were married at a higher rate than veterans served in the VA’s homeless programs—68...42,858a 6,197b 759c 23,654d Year Data Collected FY2010 FY2010 FY2009 FY2008-FY2010 Average Age 51.0 49.8 48.6 50.4 Marital Status % Married 7.1 6.3...5.6 8.5 % Divorced/Separated/Widowed 63.4e 63.3 62.0 60.5 % Never Married 29.6 30.4 32.4 25.5 Gender % Men 94.3 95.1 95.4 88.5 % Women 5.7 4.9 4.6
State involvement in and use of LANDSAT technology
NASA Technical Reports Server (NTRS)
Tessar, P. A.
1981-01-01
The background of state involvement in LANDSAT systems planning and the status of state LANDSAT use are reviewed. Major recommendations on data continuity; frequency and pattern of observation; state representation in program management; pointable sensors for a fully operational system; data processing systems; data pricing; data copyright; data archival; and technology transfer are highlighted. Plans of the government regarding the LANDSAT system are reflected in the FY-1982 budget process are examined.
Pacific Northwest Laboratory annual report for 1990 to the DOE Office of Energy Research
DOE Office of Scientific and Technical Information (OSTI.GOV)
Owczarski, E.L.
At the start of FY 1990, the atmospheric sciences and carbon dioxide research programs within the Office of Health and Environmental Research (OHER) were gathered into the new Atmospheric and Climate Research Division (ACRD). One of the central missions of this new division is to provide the Department of Energy with scientifically defensible information on the local, regional, and global distributions of energy-related pollutants and their effects on climate. This information is vital to the definition and implementation of a sound national energy strategy. Because much of the work done at PNL during FY 1990 falls under the umbrella ofmore » the new ACRD, we are including in this volume the progress and status reports for all OHER atmospheric and climate research projects at PNL. The description of ongoing atmospheric and climate research at PNL is organized along two broad research areas; atmospheric research and climate research. This report describes the progress in FY 1990 in each of these areas. A divider page summarizes the goals of each area and lists projects that support research activities.« less
The Navy’s Environmental Program and Opportunities in the Southwest
2013-08-27
Achieve RIP for all High Priority IRP Sites FY14 •Achieve RC for 90% of IRP + MRP Sites FY18 •Achieve RC for 95% of IRP + MRP Sites FY21 9 NAVFAC Southwest...8/21/2013 ER,N IRP vs. MRP ($M) NAVFAC SW 0 10 20 30 40 50 60 70 FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 4 4 7 7 7 43 54 42 51...50 57 58 58 51 18 15 11 9 MRP IRP 10 NAVFAC Southwest Southwest ER,N Requirements Overall CTC: $766M ~54% IRP; ~46% MRP IRP , $411 MRP
NASA: 1986 long-range program plan
NASA Technical Reports Server (NTRS)
1985-01-01
For the years beyond FY 1986, the plan consists of activities that are technologically possible and considered to be in the national interest. Its implementation will ensure logical and continued progress in reaching the Nation's goals in aeronautics and space, consistent with the responsibilities assigned NASA by the National Aeronautics and Space Act of 1958, as amended. The major features of the programs are described in detail and the nature of the aeronautics and space programs beyond the year 2000 are projected. The abbreviations and acronyms that appear in this report are listed. The status of NASA's plans are summarized at the time of its preparation.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-04
...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Housing Counseling Training Program... requirements for HUD's Housing Counseling Training Program NOFA for FY2010. This year's Housing Counseling... improve and standardize the quality of counseling provided by housing counselors employed by...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-04
...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Rural Innovation Fund Program... requirements for HUD's FY 2010 Rural Innovation Fund Program NOFA. Specifically, this NOFA announces the... Innovation grant funds, along with unobligated and unused funds remaining for the Rural Fund's predecessor...
Federal Research and Development Funding: FY2010
2009-07-15
6.5 focus on the development of specific weapon systems or components (e.g., the Joint Strike Fighter or missile defense systems), for which an...separate item in FY2009. The House bill would provide $15 million more than the request for chemical and biological basic research and would provide $10...Maritime 25 33 40 40 40 Chemical and Biological 208 200 207 222 207 Command, Control, and Interoperability 57 75 80 81 83 Explosives 78 96 121
Department of Defense Review of the Foreign Comparative Testing Program FY2005-FY2006
2007-04-01
Kingdom as a potential alternative to an ongoing domestic development program, which was failing to meet the size, weight , and cost objectives. The...Norway, Switzerland NAMMO, Oerlikon Contraves 0.50 USMC 40mm Training Cartridge MK281 Germany Nico Pyrotechnik 13.14 USMC High Rate-of-Fire .50 Cal...late FY 2003 and, although the system performed as advertised, it did not meet stringent weight requirements. In FY 2005, a down-sized version of
FTA multi-year research program plan (FY 2009 - FY 2013).
DOT National Transportation Integrated Search
2008-09-01
The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-03
... Federal share) IMD and other mental health facility DSH expenditures applicable to the State's FY 1995 DSH... State's total computable DSH expenditures attributable to the FY 1995 DSH allotment for mental health... health DSH expenditures applicable to the State's FY 1995 DSH allotment by the total computable amount of...
NREL Photovoltaic Program FY 1996 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report summarizes the in-house and subcontract research and development (R&D) activities under the National Renewable Energy Laboratory (NREL) Photovoltaics (PV) Program from October 1, 1995 through September 30, 1996 (fiscal year [FY] 1996). The NREL PV Program is part of the U.S. Department of Energy's (DOE) National Photovoltaics Program, as described in the DOE Photovoltaics Program Plan, FY 1991 - FY 1995. The mission of the DOE National Photovoltaics Program is to: "Work in partnership with U.S. industry to develop and deploy photovoltaic technology for generating economically competitive electric power, making photovoltaics an important contributor to the nation's andmore » the world's energy use and environmental improvement. The two primary goals of the national program are to (1) maintain the U.S. PV industry's world leadership in research and technology development and (2) help the U.S. industry remain a major, profitable force in the world market. The NREL PV Program provides leadership and support to the national program toward achieving its mission and goals.« less
Mirando, M A
2007-03-01
The National Research Initiative (NRI) Competitive Grants Program is the USDA's major competitive grants program and is administered by the Cooperative State Research, Education, and Extension Service. The NRI was authorized by the US Congress in the 1990 Farm Bill at a funding level of $500 million; however, the maximal NRI appropriation was $181.17 million in fiscal year (FY) 2006. Across all programs, the NRI is mandated to use 40% of its funding to support mission-linked research. Since its inception in 1991, the NRI has funded competitive grants in the discipline of animal reproduction. Before 2004, the Animal Reproduction Program funded a broad range of projects encompassing almost every subdiscipline in reproductive biology of farm animals, including aquatic species important to the aquaculture industry and laboratory animals. During FY 2004, the NRI Animal Reproduction Program narrowed the focus of its funding priorities to 5 issue-based topics in an effort to make greater measurable improvements in a few high-impact areas over the next 10 years. Funding priorities were narrowed further in FY 2006 to 3 subdisciplines based, in part, on recommendations that emerged from a stakeholder workshop conducted by Cooperative State Research, Education, and Extension Service in August 2004. In FY 2003, Congress authorized expenditure of up to 20% of the funds appropriated to the NRI to support projects that integrate at least 2 of the 3 functions of research, education, and extension. In FY 2004, the Animal Reproduction Program included a funding priority for integrated projects focused primarily on infertility in dairy cattle. The program funded its first integrated project in FY 2005. During FY 2002, increased emphasis on justification for the use of model systems (e.g., laboratory animals and in vitro systems) was included in the NRI request for applications. In FY 2006, applications proposing to primarily utilize nonagricultural animal models were excluded from the program. Currently, all proposed studies must be thoroughly justified in terms of their relevance to US animal agriculture and to program priorities identified within the request for applications.
DOT National Transportation Integrated Search
1997-10-01
The FY 1998-2000 Statewide Transportation Improvement Program (STIP) is a three-year program of highway and transit projects developed to fulfill the requirements set forth in the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). The ...
1992-01-01
dessert and snack items to increase acceptability and 31$,) UNCLASSIFIED UNCLASSIFIED AMENDED FY 1992/1993 BIENNIAL RDTE DESCRIPTIVE SUMMARY Program...Planned Program: " (U) Finalize development of non-organic and non-polluting processing bids for extruded and molded energetic materials * (U
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-24
... Availability for HUD's Fiscal Year (FY) 2010 Lead-Based Paint Hazard Control Grant Program and Lead Hazard Reduction Demonstration Grant Program; Technical Correction AGENCY: Office of Healthy Homes and Lead Hazard...://www.Grants.gov its Notice of Funding Availability (NOFA) for HUD's FY2010 Lead-Based Paint Hazard...
SOFIA: The Next Generation Airborne Observatory
NASA Technical Reports Server (NTRS)
Dunham, Edward; Witteborn, Fred C. (Technical Monitor)
1995-01-01
SOFIA, the Stratospheric Observatory For Infrared Astronomy, will carry a 2.5 meter telescope into the stratosphere on 160 7.5 hour flights per year. At stratospheric altitudes SOFIA will operate above 99% of the water vapor in the Earth's atmosphere, allowing observation of wide regions of the infrared spectrum that are totally obscured from even the best ground-based sites. Its mobility and long range will allow worldwide observation of ephemeral events such as occultations and eclipses. SOFIA will be developed jointly by NASA and DARA, the German space agency. It has been included in the President's budget request to Congress for a development start in FY96 (this October!) and enjoys strong support in Germany. This talk will cover SOFIA's scientific goals, technical characteristics, science operating plan, and political status.
Federal Agency biodefense funding, FY2011-FY2012.
Franco, Crystal; Sell, Tara Kirk
2011-06-01
Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through proposed funding for FY2011. This article updates those figures with budgeted amounts for FY2012, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, and State; the Environmental Protection Agency; and the National Science Foundation. This article also includes an updated assessment of the proportion of biodefense funding provided for programs that address multiple scientific, public health, healthcare, national security, and international security issues in addition to biodefense. The FY2012 federal budget for civilian biodefense totals $6.42 billion. Of that total, $5.78 billion (90%) is budgeted for programs that have both biodefense and nonbiodefense goals and applications, and $637.6 million (10%) is budgeted for programs that have objectives solely related to biodefense.
Federal agency biodefense funding, FY2013-FY2014.
Sell, Tara Kirk; Watson, Matthew
2013-09-01
Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through proposed funding for FY2013. This article updates those figures with budgeted amounts for FY2014, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, Veterans Affairs, and State; the Environmental Protection Agency; and the National Science Foundation. This article also includes an updated assessment of the proportion of biodefense funding provided for programs that address multiple scientific, public health, healthcare, national security, and international security issues in addition to biodefense. The FY2014 federal budget for civilian biodefense totals $6.69 billion. Of that total, $5.86 billion (88%) is budgeted for programs that have both biodefense and nonbiodefense goals and applications, and $835 million (12%) is budgeted for programs that have objectives solely related to biodefense.
Federal agency biodefense funding, FY2010-FY2011.
Franco, Crystal; Sell, Tara Kirk
2010-06-01
Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through FY2010. This article updates those figures with budgeted amounts for FY2011, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, and State; the Environmental Protection Agency; and the National Science Foundation. This article also includes an updated assessment of the proportion of biodefense funding provided for programs that address multiple public health, healthcare, national security, and international security issues in addition to biodefense. The FY2011 federal budget for civilian biodefense totals $6.48 billion. Of that total, $5.90 billion (91%) is budgeted for programs that have both biodefense and nonbiodefense goals and applications, and $577.9 million (9%) is budgeted for programs that deal strictly with biodefense.
Federal Agency Biodefense Funding, FY2013-FY2014
Watson, Matthew
2013-01-01
Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through proposed funding for FY2013. This article updates those figures with budgeted amounts for FY2014, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, Veterans Affairs, and State; the Environmental Protection Agency; and the National Science Foundation. This article also includes an updated assessment of the proportion of biodefense funding provided for programs that address multiple scientific, public health, healthcare, national security, and international security issues in addition to biodefense. The FY2014 federal budget for civilian biodefense totals $6.69 billion. Of that total, $5.86 billion (88%) is budgeted for programs that have both biodefense and nonbiodefense goals and applications, and $835 million (12%) is budgeted for programs that have objectives solely related to biodefense. PMID:23906009
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-11
... Doubletree Guest Suites Hotel, 181 Church St., Charleston, SC 29401; telephone: (843) 408-8733 or (843) 577... discuss: Fiscal Year (FY) 2011 and FY2012 budgets and additional grant funds; performance measures status...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Herbst, A.K.; Rogers, A.Z.; McCray, J.A.
The Low-Activity Waste Process Technology Program at the Idaho Nuclear Technology and Engineering Center (INTEC) anticipates that large volumes of low-level/low-activity wastes will need to be grouted prior to near-surface disposal. During fiscal year 1998, three grout formulations were studied for low-activity wastes derived from INTEC liquid sodium-bearing waste. Compressive strength and leach results are presented for phosphate bonding cement, acidic grout, and alkaline grout formulations. In an additional study, grout formulations are recommended for stabilization of the INTEC underground storage tank residual heels.
Materials science and engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lesuer, D.R.
1997-02-01
During FY-96, work within the Materials Science and Engineering Thrust Area was focused on material modeling. Our motivation for this work is to develop the capability to study the structural response of materials as well as material processing. These capabilities have been applied to a broad range of problems, in support of many programs at Lawrence Livermore National Laboratory. These studies are described in (1) Strength and Fracture Toughness of Material Interfaces; (2) Damage Evolution in Fiber Composite Materials; (3) Flashlamp Envelope Optical Properties and Failure Analysis; (4) Synthesis and Processing of Nanocrystalline Hydroxyapatite; and (5) Room Temperature Creep Compliancemore » of Bulk Kel-E.« less
FY 1996 Scientific and Technical Reports, Articles, Papers, and Presentations. Volume 1
NASA Technical Reports Server (NTRS)
Turner-Waits, Joyce E. (Compiler)
1996-01-01
This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY96. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.
NASA Information Resources Management Long Range Plan, FY 1994-1998
NASA Technical Reports Server (NTRS)
1993-01-01
Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Program Specific IRM Activities by Program Office; Major IRM Program Accomplishments for FY 1992; Information Collection Budget; Summary of Computer Security Plans; and Appendix: Acronym List.
First NASA/Industry High Speed Research Program Nozzle Symposium
NASA Technical Reports Server (NTRS)
Long-Davis, Mary Jo
1999-01-01
The First High Speed Research (HSR) Nozzle Symposium was hosted by NASA Lewis Research Center on November 17-19, 1992 in Cleveland, Ohio, and was sponsored by the HSR Source Noise Working Group. The purpose of this symposium was to provide a national forum for the government, industry, and university participants in the program to present and discuss important low noise nozzle research results and technology issues related to the development of appropriate nozzles for a commercially viable, environmentally compatible, U.S. High-Speed Civil Transport. The HSR Phase I research program was initiated in FY90 and is approaching the first major milestone (end of FY92) relative to an initial FAR 36 Stage 3 nozzle noise assessment. Significant research results relative to that milestone were presented. The opening session provided a brief overview of the Program and status of the Phase H plan. The next five sessions were technically oriented and highlighted recent significant analytical and experimental accomplishments. The last Session included a panel discussion by the Session Chairs, summarizing the progress seen to date and discussing issues relative to further advances in technology necessary to achieve the Program Goals. Attendance at the Symposium was by invitation only and included only industry, academic, and government participants who are actively involved in the High-Speed Research Program. The technology presented in this meeting is considered commercially sensitive.
25 CFR 39.1003 - Allotment exception for FY 1991.
Code of Federal Regulations, 2010 CFR
2010-04-01
... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...
25 CFR 39.1003 - Allotment exception for FY 1991.
Code of Federal Regulations, 2014 CFR
2014-04-01
... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...
25 CFR 39.1003 - Allotment exception for FY 1991.
Code of Federal Regulations, 2012 CFR
2012-04-01
... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...
25 CFR 39.1003 - Allotment exception for FY 1991.
Code of Federal Regulations, 2013 CFR
2013-04-01
... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...
25 CFR 39.1003 - Allotment exception for FY 1991.
Code of Federal Regulations, 2011 CFR
2011-04-01
... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...
FY11 Facility Assessment Study for Aeronautics Test Program
NASA Technical Reports Server (NTRS)
Loboda, John A.; Sydnor, George H.
2013-01-01
This paper presents the approach and results for the Aeronautics Test Program (ATP) FY11 Facility Assessment Project. ATP commissioned assessments in FY07 and FY11 to aid in the understanding of the current condition and reliability of its facilities and their ability to meet current and future (five year horizon) test requirements. The principle output of the assessment was a database of facility unique, prioritized investments projects with budgetary cost estimates. This database was also used to identify trends for the condition of facility systems.
U.S. Congress playing budgetary endgame
NASA Astrophysics Data System (ADS)
Carlowicz, Mike
With fiscal year 1997 (FY '97) set to begin on October 1, the U.S. Congress was poised to fund most American science programs and agencies at or above the levels of funding appropriated in the tumultuous FY '96. Seeking to avert a drawn-out budget debate during an election year, congressional leaders were working feverishly in the last week of September to write appropriations bills that would be acceptable—though not necessarily satisfying—to both Congress and the Clinton Administration.On September 24, the U.S. House of Representatives and the Senate approved the conference report of H.R. 3666, the appropriations bill that provides funding for the departments of Veterans Affairs, Housing and Urban Development, and the Independent Agencies. The conference report of this VA-HUD bill provides $84.7 billion in spending for the affected agencies, including NASA, the Environmental Protection Agency (EPA), and the National Science Foundation (NSF). The conference report was weighted heavily toward the preferences of the Senate, where moderates and pragmatists were stressing compromise and pushing for appropriations bills that President Clinton would be likely to sign.
2016 Targeted AirShed Grant Program - Closed Announcement FY 2016
Targeted Air Shed Grant Program proposal for FY 2016. The overall goal of the program is to reduce air pollution in the Nation’s areas with the highest levels of ozone and PM2.5 ambient air concentrations.
2015 Targeted AirShed Grant Program Grant - Closed Announcement FY 2015
Targeted Air Shed Grant Program proposal for FY 2015. The overall goal of the program is to reduce air pollution in the Nation’s areas with the highest levels of ozone and PM2.5 ambient air concentrations.
76 FR 37174 - Capital Investment Program-New Starts and Small Starts Program Funds
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-24
... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Capital Investment Program--New Starts... apportionment of the FY 2011 Capital Investment (New Starts and Small Starts) program funds. The funds will be... FY 2011, $1,596,800,000 was appropriated for the Capital Investments Grant Account, which includes...
FY 2016 Annual Performance Report
Presents detailed performance results, as measured against the targets established in EPA’s FY 2016 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2016 program evaluations.
FY 2017 Annual Performance Report (APR)
Presents detailed performance results, as measured against the targets established in EPA’s FY 2017 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2017 program evaluations.
FY 2015 Annual Performance Report
Presents detailed performance results, as measured against the targets established in EPA’s FY 2015 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2015 program evaluations.
Appendix F: FreedomCAR and Vehicle Technologies Program inputs for FY 2008 benefits estimates
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2009-01-18
Document summarizes the results of the benefits analysis of EERE’s programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and nine Research, Development, Demonstration, and Deployment (RD3) programs.
DOE Solar Energy Technologies Program FY 2005 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sutula, Raymond A.
The DOE Solar Energy Technologies Program FY 2005 Annual Report chronicles the R&D results of the program for fiscal year 2005. In particular, the report describes R&D performed by the Program’s national laboratories and university and industry partners.
FY15 Status Report on NEAMS Neutronics Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, C. H.; Shemon, E. R.; Smith, M. A.
2015-09-30
This report summarizes the current status of NEAMS activities in FY2015. The tasks this year are (1) to improve solution methods for steady-state and transient conditions, (2) to develop features and user friendliness to increase the usability and applicability of the code, (3) to improve and verify the multigroup cross section generation scheme, (4) to perform verification and validation tests of the code using SFRs and thermal reactor cores, and (5) to support early users of PROTEUS and update the user manuals.
ERIC Educational Resources Information Center
Connecticut Department of Higher Education (NJ1), 2009
2009-01-01
This report explains that the General Fund budget: (1) calls for $1,565.4 million for the FY 2009-11 biennium, including $781.2 million in FY 2010 and $784.2 million in FY 2011; and (2) maintains the State's primary student financial aid programs at FY 2009 funding levels, with Connecticut Aid to Charter Oak funded at 80.0 percent of full funding…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-24
... increase in the CPI-U for the prior FY (0.0 percent). Column F FY 2010 TC MAP Exp. Incl. DSH. This column... including DSH expenditures. Column G FY 2010 TC MAP Exp. Net of DSH. This column contains the amount of the States' actual FY 2010 total computable DSH expenditures. Column H FY 2010 TC MAP Exp. Net of DSH. This...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Core, Gregory Matthew
This report contains a summary of irradiation testing of Fuel Cycle Research and Development (FCRD) Accident Tolerant Fuels Series 1 (ATF 1) experiments performed at Idaho National Laboratory (INL) in FY 2016. ATF 1 irradiation testing work performed in FY 2016 included design, analysis, and fabrication of ATF-1B drop in capsule ATF 1 series experiments and irradiation testing of ATF-1 capsules in the ATR.
2009 DOE Vehicle Technologies Program Annual Merit Review
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
2009-10-01
Annual Merit Review and Peer Evaluation Meeting to review the FY2008 accomplishments and FY2009 plans for the Vehicle Technologies Program, and provide an opportunity for industry, government, and academic to give inputs to DOE on the Program with a structured and formal methodology.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-14
... (FY) 2011; Undergraduate International Studies and Foreign Language (UISFL) Program; International Research and Studies (IRS) Program; et al. AGENCY: Office of Postsecondary Education, Department of...; Undergraduate International Studies and Foreign Language (UISFL) Program; International Research and Studies...
Light Water Reactor Sustainability Program FY13 Status Update for EPRI - RISMC Collaboration
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, Curtis
2013-09-01
The purpose of the Risk Informed Safety Margin Characterization (RISMC) Pathway research and development (R&D) is to support plant decisions for risk-informed margins management with the aim to improve economics, reliability, and sustain safety of current NPPs. Goals of the RISMC Pathway are twofold: (1) Develop and demonstrate a risk-assessment method coupled to safety margin quantification that can be used by NPP decision makers as part of their margin recovery strategies. (2) Create an advanced "RISMC toolkit" that enables more accurate representation of NPP safety margin. In order to carry out the R&D needed for the Pathway, the Idaho Nationalmore » Laboratory (INL) is collaborating with the Electric Power Research Institute (EPRI) in order to focus on applications of interest to the U.S. nuclear power industry. This report documents the collaboration activities performed between INL and EPRI during FY2013.« less
Avionics Architectures for Exploration: Building a Better Approach for (Human) Spaceflight Avionics
NASA Technical Reports Server (NTRS)
Goforth, Montgomery B.; Ratliff, James E.; Hames, Kevin L.; Vitalpur, Sharada V.
2014-01-01
The field of Avionics is advancing far more rapidly in terrestrial applications than in space flight applications. Spaceflight Avionics are not keeping pace with expectations set by terrestrial experience, nor are they keeping pace with the need for increasingly complex automation and crew interfaces as we move beyond Low Earth Orbit. NASA must take advantage of the strides being made by both space-related and terrestrial industries to drive our development and sustaining costs down. This paper describes ongoing efforts by the Avionics Architectures for Exploration (AAE) project chartered by NASA's Advanced Exploration Systems (AES) Program to evaluate new avionic architectures and technologies, provide objective comparisons of them, and mature selected technologies for flight and for use by other AES projects. Results from the AAE project's FY13 efforts are discussed, along with the status of FY14 efforts and future plans.
Exploration studies technical report, FY1988 status. Volume 1: Technical summary
NASA Technical Reports Server (NTRS)
1988-01-01
The Office of Exploration (OEXP) at NASA Headquarters has been tasked with defining and recommending alternatives for an early 1990's nationaL decision on a focused program of human exploration of the solar system. The Mission Analysis and System Engineering (MASE) group, which is managed by the Exploration Studies Office at the Lyndon B. Johnson Space Center, is responsible for coordinating the technical studies necessary for accomplishing such a task. This technical report, produced by the MASE, describes the process that has been developed in a case study approach. The four case studies developed in FY88 include: (1) Human Expedition to Phobos; (2) Human Expedition to Mars; (3) Lunar Observatory; and (4) Lunar Outpost to Early Mars Evolution. The final outcome of this effort is a set of programmatic and technical conclusions and recommendations for the following year's work.
The Nuclear Energy Advanced Modeling and Simulation Enabling Computational Technologies FY09 Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Diachin, L F; Garaizar, F X; Henson, V E
2009-10-12
In this document we report on the status of the Nuclear Energy Advanced Modeling and Simulation (NEAMS) Enabling Computational Technologies (ECT) effort. In particular, we provide the context for ECT In the broader NEAMS program and describe the three pillars of the ECT effort, namely, (1) tools and libraries, (2) software quality assurance, and (3) computational facility (computers, storage, etc) needs. We report on our FY09 deliverables to determine the needs of the integrated performance and safety codes (IPSCs) in these three areas and lay out the general plan for software quality assurance to meet the requirements of DOE andmore » the DOE Advanced Fuel Cycle Initiative (AFCI). We conclude with a brief description of our interactions with the Idaho National Laboratory computer center to determine what is needed to expand their role as a NEAMS user facility.« less
FY17 Status Report on NEAMS Neutronics Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, C. H.; Jung, Y. S.; Smith, M. A.
2017-09-30
Under the U.S. DOE NEAMS program, the high-fidelity neutronics code system has been developed to support the multiphysics modeling and simulation capability named SHARP. The neutronics code system includes the high-fidelity neutronics code PROTEUS, the cross section library and preprocessing tools, the multigroup cross section generation code MC2-3, the in-house meshing generation tool, the perturbation and sensitivity analysis code PERSENT, and post-processing tools. The main objectives of the NEAMS neutronics activities in FY17 are to continue development of an advanced nodal solver in PROTEUS for use in nuclear reactor design and analysis projects, implement a simplified sub-channel based thermal-hydraulic (T/H)more » capability into PROTEUS to efficiently compute the thermal feedback, improve the performance of PROTEUS-MOCEX using numerical acceleration and code optimization, improve the cross section generation tools including MC2-3, and continue to perform verification and validation tests for PROTEUS.« less
Status Report on NEAMS PROTEUS/ORIGEN Integration
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wieselquist, William A
2016-02-18
The US Department of Energy’s Nuclear Energy Advanced Modeling and Simulation (NEAMS) Program has contributed significantly to the development of the PROTEUS neutron transport code at Argonne National Laboratory and to the Oak Ridge Isotope Generation and Depletion Code (ORIGEN) depletion/decay code at Oak Ridge National Laboratory. PROTEUS’s key capability is the efficient and scalable (up to hundreds of thousands of cores) neutron transport solver on general, unstructured, three-dimensional finite-element-type meshes. The scalability and mesh generality enable the transfer of neutron and power distributions to other codes in the NEAMS toolkit for advanced multiphysics analysis. Recently, ORIGEN has received considerablemore » modernization to provide the high-performance depletion/decay capability within the NEAMS toolkit. This work presents a description of the initial integration of ORIGEN in PROTEUS, mainly performed during FY 2015, with minor updates in FY 2016.« less
75 FR 25913 - Alternative Transportation in Parks and Public Lands Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-10
... Fiscal Year (FY) 2009 appropriations for the Paul S. Sarbanes Transit in Parks program (formally the... $464,027 will be added to available FY 2010 appropriations for the program. A total of 80 applicants... collaborative process. The goals of the program are to conserve natural, historical, and cultural resources...
Integrated Data Base Program: a status report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Notz, K.J.; Klein, J.A.
1984-06-01
The Integrated Data Base (IDB) Program provides official Department of Energy (DOE) data on spent fuel and radioactive waste inventories, projections, and characteristics. The accomplishments of FY 1983 are summarized for three broad areas: (1) upgrading and issuing of the annual report on spent fuel and radioactive waste inventories, projections, and characteristics, including ORIGEN2 applications and a quality assurance plan; (2) creation of a summary data file in user-friendly format for use on a personal computer and enhancing user access to program data; and (3) optimizing and documentation of the data handling methodology used by the IDB Program and providingmore » direct support to other DOE programs and sites in data handling. Plans for future work in these three areas are outlined. 23 references, 11 figures.« less
NASA Technical Reports Server (NTRS)
Penaranda, Frank E.
1992-01-01
The topics are presented in viewgraph form and include the following: international comparison of R&D expenditures in 1989; NASA Technology Transfer Program; NASA Technology Utilization Program thrusts for FY 1992 and FY 1993; National Technology Transfer Network; and NTTC roles.
Nevada Test Site-Directed Research and Development, FY 2007 Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wil Lewis, editor
2008-02-20
The Nevada Test Site-Directed Research and Development (SDRD) program completed a very successful year of research and development activities in FY 2007. Twenty-nine new projects were selected for funding this year, and eight projects started in FY 2006 were brought to conclusion. The total funds expended by the SDRD program were $5.67 million, for an average per-project cost of $153 thousand. An external audit conducted in September 2007 verified that appropriate accounting practices were applied to the SDRD program. Highlights for the year included: programmatic adoption of 8 SDRD-developed technologies; the filing of 9 invention disclosures for innovation evolving frommore » SDRD projects; participation in the tri-Lab Laboratory Directed Research and Development (LDRD) and SDRD Symposium that was broadly attended by Nevada Test Site (NTS), National Nuclear Security Administration (NNSA), LDRD, U.S. Department of Homeland Security (DHS), and U.S. Department of Defense (DoD) representatives; peer reviews of all FY 2007 projects; and the successful completion of 37 R&D projects, as presented in this report. In response to a company-wide call, authors throughout the NTS complex submitted 182 proposals for FY 2007 SDRD projects. The SDRD program has seen a dramatic increase in the yearly total of submitted proposals--from 69 in FY 2002 to 182 this year--while the number of projects funded has actually decreased from a program high of 57 in FY 2004. The overall effect of this trend has helped ensure an increasingly competitive program that benefited from a broader set of innovative ideas, making project selection both challenging and rewarding. Proposals were evaluated for technical merit, including such factors as innovation, probability of success, potential benefit, and mission applicability. Authors and reviewers benefited from the use of a shortfalls list entitled the 'NTS Technology Needs Assessment' that was compiled from NTS, National Weapons Laboratory (NWL), and NNSA sources. This tool continues to be of considerable value in aligning the SDRD program with mission priorities, and was expanded in FY 2007 to include technology development needs from the DHS and other agencies with missions closely aligned to that of the NTS.« less
The U.S. Environmental Protection Agency’s Chesapeake Bay Program Office is announcing a Request for Proposals for applicants to provide the Chesapeake Bay Program partners with a proposal(s) for providing technical analysis and programmatic evaluation
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-20
...) Letter No. 13-10: Fiscal Year (FY) 2011 State Initial Allocations and the Process for Requesting...-10 entitled, FY 2011 State Initial Allocations and the Process for Requesting Additional TAA Program... INFORMATION: Fiscal Year (FY) 2011 State Initial Allocations and the Process for Requesting Additional Trade...
75 FR 69047 - Sunshine Act Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-10
... Recommendations for Briefing Report on English-Only in the Workplace. Update on FY 2011 Cy Pres Enforcement Report... Rebuttals. Discussion of Possible Briefing Topics for FY 2011. Update on Status of Briefing on Disparate...--Some of the discussion of this agenda item may be held in closed session. Update on Clearinghouse...
75 FR 70898 - Sunshine Act Notice-AMENDED
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-19
... Recommendations for Briefing Report on English-Only in the Workplace Update on FY 2011 Cy Pres Enforcement Report... Rebuttals Discussion of Possible Briefing Topics for FY 2011 Update on Status of Briefing on Disparate...--Some of the discussion of this agenda item may be held in closed session [[Page 70899
Federal Funding for Health Security in FY2016.
Boddie, Crystal; Sell, Tara Kirk; Watson, Matthew
2015-01-01
This article assesses US government funding in 5 domains critical to strengthening health security: biodefense programs, radiological and nuclear programs, chemical programs, pandemic influenza and emerging infectious disease programs, and multiple-hazard and preparedness programs. This year's article also highlights the emergency funding appropriated in FY2015 to enable the international and domestic response to the Ebola outbreak in West Africa.
Federal Funding for Health Security in FY2016
Sell, Tara Kirk; Watson, Matthew
2015-01-01
This article assesses US government funding in 5 domains critical to strengthening health security: biodefense programs, radiological and nuclear programs, chemical programs, pandemic influenza and emerging infectious disease programs, and multiple-hazard and preparedness programs. This year's article also highlights the emergency funding appropriated in FY2015 to enable the international and domestic response to the Ebola outbreak in West Africa. PMID:26042863
2005-08-02
called LHD-8 and is also procuring new LPD-17 class amphibious ships. A total of 12 LPD-17s were originally planned , but the FY2006-FY2011 Future Years...Defense Plan (FYDP) proposes reducing that figure to nine, with the final two to be procured in FY2006 and FY2007. The FY2006-FY2011 FYDP also calls...developments have caused the Navy to reconsider its plans for procuring amphibious ships and maritime prepositioning ships. One is a new concept of operations
Annotated bibliography of human factors applications literature
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCafferty, D.B.
1984-09-30
This bibliography was prepared as part of the Human Factors Technology Project, FY 1984, sponsored by the Office of Nuclear Safety, US Department of Energy. The project was conducted by Lawrence Livermore National Laboratory, with Essex Corporation as a subcontractor. The material presented here is a revision and expansion of the bibliographic material developed in FY 1982 as part of a previous Human Factors Technology Project. The previous bibliography was published September 30, 1982, as Attachment 1 to the FY 1982 Project Status Report.
High performance computing and communications: FY 1997 implementation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-12-01
The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A providesmore » a detailed look at HPCC Program activities within each agency.« less
FY 2017 Grant Announcement: FY 2017 Source Reduction Assistance Grant Program
The EPA Region 10 Pollution Prevention Program is announcing a grant competition for Source Reduction Assistance (SRA) awards. EPA Region 10 anticipates awarding approximately $95,000 in federal grant funding to support SRA agreements.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-10
... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5600-N-18-C-1] HUD's Fiscal Year (FY) 2012 Transformation Initiative: Natural Experiments Research Grant Program, Cancellation AGENCY: Office... Availability (NOFA) ``Transformation Initiative: Natural Experiments Grant Program'' on Grants.gov . The close...
The U.S. Environmental Protection Agency’s Chesapeake Bay Program Office is announcing a request for proposals (RFP) for supporting both the:1.Small Watershed Grants (SWG) program; and 2.Innovative Nutrient and Sediment Reduction (INSR) grants program.
Microgravity science and applications. Program tasks and bibliography for FY 1994
NASA Technical Reports Server (NTRS)
1995-01-01
This annual report includes research projects funded by the Office of Life and Microgravity Sciences and Applications, Microgravity Science and Applications Division, during FY 1994. It is a compilation of program tasks (objective, description, significance, progress, students funded under research, and bibliographic citations) for flight research and ground-based research in five major scientific disciplines: benchmark science, biotechnology, combustion science, fluid physics, and materials science. ATD (Advanced Technology Development) program task descriptions are also included. The bibliography cites the related PI (Principal Investigator) publications and presentations for these program tasks in FY 1994. Three appendices include Table of Acronyms, Guest Investigator Index, and Principal Investigator Index.
Microgravity science & applications. Program tasks and bibliography for FY 1995
NASA Technical Reports Server (NTRS)
1996-01-01
This annual report includes research projects funded by the Office of Life and Microgravity Sciences and Applications, Microgravity Science and Applications Division, during FY 1994. It is a compilation of program tasks (objective, description, significance, progress, students funded under research, and bibliographic citations) for flight research and ground based research in five major scientific disciplines: benchmark science, biotechnology, combustion science, fluid physics, and materials science. Advanced technology development (ATD) program task descriptions are also included. The bibliography cites the related principle investigator (PI) publications and presentations for these program tasks in FY 1994. Three appendices include a Table of Acronyms, a Guest Investigator index and a Principle Investigator index.
2008 Federal Energy Management Program (FEMP) Market Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tremper, C.
2009-07-01
This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.
2003-07-01
magnetorheological (MRF) finishing to reduce surface roughness in half the time of previous processes . Improved image quality directly supports improved...affordably polish the inside surface of small tight free form optics to a finish on the order of 3 angstroms. • Demonstrate cycle time reduction...processes and controls for steel, titanium, and superalloys. FY2007: • Demonstrate an improved superfine finishing for optical components to
NREL photovoltaic program FY 1997 annual report
DOE Office of Scientific and Technical Information (OSTI.GOV)
McConnell, R.D.; Hansen, A.; Smoller, S.
1998-06-01
This report summarizes the in-house and subcontracted research and development (R and D) activities under the NREL PV Program from October 1, 1996, through September 30, 1997 (FY 1997). The NREL PV Program is part of the US Department of Energy`s (DOE`s) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996--2000. The FY 1997 budget authority for carrying out the NREL PV Program was $39.3 million in operating funds and $0.4 million in capital equipment funds. Subcontract activities represent a major part of the NREL PV Program, with $21.8 million (55% of PV funds) goingmore » to some 84 subcontractors. Cost sharing by industry added almost $8.8 million to the subcontract R and D activities with industry.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-23
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Administration for Children and Families Reallotment of FY... of Fiscal Year (FY) 2011 funds may be available for re-allotment. After a 30-day comment period, this amount has not changed. This notice announces that $3,089,920 was reallotted on September 26, 2012 to FY...
Financial Summary Tables. Department of Defense Budget for Fiscal Year 1979
1978-01-01
79 Q FAD 740 - Object Classification Distribution of Direct and Reimbursable Obligations, FY 77, FY 78 and FY 79 .U 762 - FY 1979 Reimbursable Program...FAO-738/79 (FILE IN VOL. It JAN 23, 1978 PAGE 1 UOGET BALANCES REIMBURSABLE RECOVERIES TOTAL DIRECT OBLIGATIONS...m.---- .---- ...------.m.---- -..m.----.......---e e e ee-- - - - DIRECT OBLIGATIONS REIMBURSABLE TOTAL WRITEOFFS UNOBLIGATED UNOBLIGATED
Lopez, G H; Morrison, J; Condon, J A; Wilson, B; Martin, J R; Liew, Y-W; Flower, R L; Hyland, C A
2015-10-01
Duffy blood group phenotypes can be predicted by genotyping for single nucleotide polymorphisms (SNPs) responsible for the Fy(a) /Fy(b) polymorphism, for weak Fy(b) antigen, and for the red cell null Fy(a-b-) phenotype. This study correlates Duffy phenotype predictions with serotyping to assess the most reliable procedure for typing. Samples, n = 155 (135 donors and 20 patients), were genotyped by high-resolution melt PCR and by microarray. Samples were in three serology groups: 1) Duffy patterns expected n = 79, 2) weak and equivocal Fy(b) patterns n = 29 and 3) Fy(a-b-) n = 47 (one with anti-Fy3 antibody). Discrepancies were observed for five samples. For two, SNP genotyping predicted weak Fy(b) expression discrepant with Fy(b-) (Group 1 and 3). For three, SNP genotyping predicted Fy(a) , discrepant with Fy(a-b-) (Group 3). DNA sequencing identified silencing mutations in these FY*A alleles. One was a novel FY*A 719delG. One, the sample with the anti-Fy3, was homozygous for a 14-bp deletion (FY*01N.02); a true null. Both the high-resolution melting analysis and SNP microarray assays were concordant and showed genotyping, as well as phenotyping, is essential to ensure 100% accuracy for Duffy blood group assignments. Sequencing is important to resolve phenotype/genotype conflicts which here identified alleles, one novel, that carry silencing mutations. The risk of alloimmunisation may be dependent on this zygosity status. © 2015 International Society of Blood Transfusion.
Military needs and forecast, 2
NASA Technical Reports Server (NTRS)
Goldstayn, Alan B.
1986-01-01
FORECAST 2 has accomplished its objectives of identifying high leverage technologies for corporate Air Force review. Implementation is underway with emphasis on restructuring existing programs and programming resources in the FY88 BES/FY89 POM. Many joint service/agency opportunities exist.
The Department of the Navy Subcontracting Program Update
2014-08-01
calculaCon of single FY acCvity at the contract level Tot Subcontracting SB SDB WOSB HUB VOSB SDVOSB 2011...2014 Office of Small Business Programs Department of the Navy http://SmallBusiness.Navy.mil SB SDB WOSB HUB SDV FY14 Average 37.0% 5.7...6.8% 2.6% 3.0% Trend Analysis 38.0% 5.8% 6.8% 2.4% 3.1% FY 14 Targets 37.0% 5.7% 6.8% 2.5% 3.0% SB SDB WOSB HUB SDV FY 14 DoD-Wide Goals 36.7% 3.0
2012 Wind Program Peer Review Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zayas, Jose; Higgins, Mark
2012-06-01
This report summarizes the proceedings of the 2012 Wind Program Peer Review, the goals of which were to review and evaluate the strategy and goals of the Wind Program; review and evaluate the progress and accomplishments of the program's projects funded in fiscal year (FY) 2010 and FY 2011; and foster interactions among the national laboratories, industry, and academic institutions conducting research and development on behalf of the program.
DOE Solar Energy Technologies Program FY 2005 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The DOE Solar Energy Technologies Program FY 2005 Annual Report chronicles the R&D results of the U.S. Department of Energy Solar Energy Technologies Program for Fiscal Year 2005. In particular, the report describes R&D performed by the Program?s national laboratories (National Renewable Energy Laboratory, Sandia National Laboratories, Oak Ridge National Laboratory, and Brookhaven National Laboratory) and university and industry partners.
Fang, Michele; Linson, Eric; Suneja, Manish; Kuperman, Ethan F
2017-02-22
Excellence in Graduate Medical Education requires the right clinical environment with an appropriate workload where residents have enough patients to gain proficiency in medicine with optimal time for reflection. The Accreditation Council for Graduate Medical Education (ACGME) has focused more on work hours rather than workload; however, high resident workload has been associated with lower resident participation in education and fatigue-related errors. Recognizing the potential risks associated with high resident workload and being mindful of the costs of reducing resident workload, we sought to reduce residents' workload by adding an advanced practice provider (APP) to the surgical comanagement service (SCM) and study its effect on resident satisfaction and perceived educational value of the rotation. In Fiscal Year (FY) 2014 and 2015, an additional faculty member was added to the SCM rotation. In FY 2014, the faculty member was a staff physician, and in FY 2015, the faculty member was an APP.. Resident workload was assessed using billing data. We measured residents' perceptions of the rotation using an anonymous electronic survey tool. We compared FY2014-2015 data to the baseline FY2013. The number of patients seen per resident per day decreased from 8.0(SD 3.3) in FY2013 to 5.0(SD 1.9) in FY2014 (p < 0.001) and 5.7(SD 2.0) in FY2015 (p < 0.001). A higher proportion of residents reported "just right" patient volume (64.4%, 91.7%, 96.7% in FY2013, 2014, 2015 respectively p < 0.001), meeting curricular goals (79.9%, 95.0%, 97.2%, in FY2013, 2014 and 2015 respectively p < 0.001), and overall educational value of the rotation (40.0%, 72.2%, 72.6% in FY2013, 2014, 2015 respectively, p < 0.001). Decreasing resident workload through adding clinical faculty (both staff physician and APPs) was associated with improvements on resident perceived educational value and clinical experience of a medical consultation rotation.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-30
... DEPARTMENT OF EDUCATION [CFDA No. 84.215L] Office of Elementary and Secondary Education; Smaller Learning Communities Program; Notice Inviting Applications for New Awards Using Fiscal Year (FY) 2009 Funds... applications for new awards using fiscal year (FY) 2009 funds for the Smaller Learning Communities Program...
FY2015 Analysis of the Teamwork USA Program. Memorandum
ERIC Educational Resources Information Center
Howard, Mark
2015-01-01
The Department of Research and Evaluation (DRE) has completed an analysis of the performance of students who participated in the Teamwork USA Program, administered in FY2014 at three District schools. Teamwork USA hopes to improve student achievement at select Title I elementary schools via its Instrumental Music Program grant. This memorandum to…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anita Gianotto; Dena Tomchak
As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.
State Training & Employment Program. Program Review for FY99-FY01.
ERIC Educational Resources Information Center
Cordova, Lorraine
Alaska's State Training and Employment Program (STEP) was designed with the primary objective of reducing current and future claims against Unemployment Insurance (UI) benefits by providing training to those who are unemployed or facing unemployment. STEP is also charged with fostering growth of existing businesses and attracting new businesses to…
Annual Defense Department Report FY 1973
1972-02-22
program of combatting Sickle- Cell Anemia. Finally, as we approach an all-volunteer force we will continually assess our recruiting and retention programs...GNP devoted to Defense continues to decline -- from 7.0% in FY 1972 to 6.4% in FY 1973. This is a 22 year low. 59 We also are requesting a suplemental ...complement Total Force Planning. Some of these initiatives will fall in areas where the U.S. bears the primary responsibility, while others stem from
FY 1998 Proposed Rail Improvement Program Supplement Update - Bloomington II
DOT National Transportation Integrated Search
1997-07-01
The purpose of this amendment to the FY 1998 Rail Improvement Program Supplement : is to present an analysis which has been formulated, using prescribed methodology, to assist in an investment decision concerning track rehabilitation and new track co...
FY 1998 Proposed Rail Improvement Program Supplement Update - Pontiac
DOT National Transportation Integrated Search
1997-07-01
The purpose of this amendment to the FY 1998 Rail Improvement Program Supplement is to present an analysis which has been formulated, using prescribed methodology, to assist in an investment decision concerning new track construction at the Prairie C...
FY 2018 Grant Announcement: FY2018 Support for Geospatial Analysis Support
The U.S. Environmental Protection Agency’s (EPA) Chesapeake Bay Program Office (CBPO) is announcing a Request for Proposals (RFP) for applicants to provide the Chesapeake Bay Program (CBP) partners with a proposal for providing geospatial analysis support
FY2013 Defense Budget Request: Overview and Context
2012-04-20
Prescribed by ANSI Std Z39-18 FY2013 Defense Budget Request: Overview and Context Congressional Research Service Summary This report analyzes ...Congressional action on the FY2013 defense budget will be analyzed in a separate report. The FY2013 Department of Defense (DOD) budget request...defense-related nuclear programs conducted by the Department of Energy , and other activities. For discretionary DOD budget authority, the request includes
U.S. Department of Transportation : FY 1998 budget in brief
DOT National Transportation Integrated Search
1998-01-01
The fiscal year (FY) 1998 budget request for DOT makes a down payment on meeting the : transportation challenges of the 21st century. A total of $38.4 billion is proposed to support : transportation programs in FY 1998. This is approximately one perc...
2013-08-07
This final rule updates the hospice payment rates and the wage index for fiscal year (FY) 2014, and continues the phase out of the wage index budget neutrality adjustment factor (BNAF). Including the FY 2014 15 percent BNAF reduction, the total 5 year cumulative BNAF reduction in FY 2014 will be 70 percent. The BNAF phase-out will continue with successive 15 percent reductions in FY 2015 and FY 2016. This final rule also clarifies how hospices are to report diagnoses on hospice claims, and provides updates to the public on hospice payment reform. Additionally, this final rule changes the requirements for the hospice quality reporting program by discontinuing currently reported measures and implementing a Hospice Item Set with seven National Quality Forum (NFQ) endorsed measures beginning July 1, 2014, as proposed. Finally, this final rule will implement the hospice Experience of Care Survey on January 1, 2015, as proposed.
Scout launch vehicle, phases 4 and 5
NASA Technical Reports Server (NTRS)
Mccracken, D. C.; Leiss, A.; Horrocks, E. R.; Turpen, N. H.
1974-01-01
The historical data of the Scout launch vehicle program for Phases IV and V (vehicles 138 through 177) is presented for the FY 1966 through FY 1971 time period. Technical data and accounting information are detailed to provide a total picture of the program.
ARIES Oxide Production Program Annual Report - FY14
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kelley, Evelyn A.; Dinehart, Steven Mark
A summary of the major accomplishments (September), milestones, financial summary, project performance and issues facing the ARIES Oxide Production Program at the close of FY14 is presented in this Executive Summary. Annual accomplishments are summarized in the body of the report.
Notification: Hotline Complaint Regarding the EPA Region 4 Environmental Justice Program
Project #OPE-FY12-0017, September 17, 2012. We have completed the preliminary research portion ofour evaluation, Hotline Complaint Regarding the EPA Region 4 Environmental Justice Program (OPE FY12-0017) and will now continue into the fieldwork phase.
FY2017 Defense Appropriations Fact Sheet: Selected Highlights of H.R. 5293 and S. 3000
2016-06-17
legally binding caps on discretionary spending for defense programs and for non-defense programs, which were established by P.L. 114-74, the Bipartisan...funding for FY2017 that (1) exceeds the relevant BBA cap ; and (2) is also exempt from that spending cap because it is classified as funding for so-called...Overseas Contingency Operations (OCO). The 2015 BBA increased binding caps on defense and non-defense discretionary appropriations for FY2016 and
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-15
...In accordance with section 102(a)(4)(C) of the Department of Housing and Urban Development Reform Act of 1989, this announcement notifies the public of past funding decisions made by the Department in a competition for funding under the FY2011 Notice of Funding Availability (NOFAs) for the Homeless Assistance Grants program. This announcement contains the names of the awardees and the amounts of the awards made available by HUD in FY2011.
2007-06-12
up Northrop Grumman Ship Systems ( NGSS ). Table 2. FY2008-FY2013 Amphibious and MPF(F) Ship Procurement Plan (Ships fully funded in FY2006 shown for... Plan . . 13 Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress Introduction The...is whether to approve, modify, or reject the Navy’s plans for procuring amphibious and MPF(F) ships. Decisions that Congress makes on this CRS-2 1 The
Navy DDG-1000 Destroyer Program: Background, Oversight Issues, and Options for Congress
2007-10-25
production quantity of eight ships (one more than the Navy currently plans to procure). Shared Production Arrangement. NGSS and GD/BIW have agreed on a...X)). Navy plans call for procuring 7 DDG-1000s between FY2007 and FY2013. The first two DDG-1000s were procured in FY2007 and are being split...Congress for the DDG-1000 program include supporting the Navy’s proposed plans , using a block-buy arrangement for procuring several DDG-1000s, and
Program Direction FY 2017 Budget At-A-Glance
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2016-03-01
Program Direction enables EERE to maintain and support a world-class federal workforce to accomplish its mission of creating and sustaining American leadership in the sustainable transportation, renewable power, and energy efficiency sectors. The FY 2017 Program Direction budget request provides resources for program and project management, administrative support, contract administration, human capital management, headquarters and field site non-laboratory facilities and infrastructure, and contractor support.
EVALUATION TECHNIQUES AND TOOL DEVELOPMENT FOR FY 08 CMAQ RELEASE
In this task, research efforts are outlined that relate to the AMD Model Evaluation Program element and support CMAQ releases within the FY05-FY08 time period. Model evaluation serves dual purposes; evaluation is necessary to characterize the accuracy of model predictions, and e...
2016-01-22
In accordance with court rulings in cases that challenge the federal fiscal year (FY) 2004 outlier fixed-loss threshold rulemaking, this document provides further explanation of certain methodological choices made in the FY 2004 fixed-loss threshold determination.
The EPA Global Change Research Program is pleased to inform you of the publication of the new Our Changing Planet: The FY 2002 U.S. Global Change Research Program. This annual report to the Congress was prepared under the auspices of the Committee on Environment and Natural Reso...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-06
... Program. This announcement contains the consolidated names and addresses of the award recipients under... Awards, HOPE VI Main Street Grant Program, Fiscal Year (FY) 2011 and 2012 AGENCY: Office of the Assistant Secretary for Public and Indian Housing, HUD. ACTION: Announcement of funding awards. SUMMARY: In accordance...
Tanks Focus Area Site Needs Assessment - FY 2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.
2001-04-30
The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, frommore » collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.« less
San Diego transit five year plan update : FY 1982-1986
DOT National Transportation Integrated Search
1981-07-01
The Five Year Plan Update constitutes the annual revision to the operating plan and capital program for the following five year planning period, presents its adopted budget and a specific operating plan and capital program for FY 1982 as well as less...
INDOT Research Program Benefit Cost Analysis—Return on Investment for Projects Completed in FY 2016
DOT National Transportation Integrated Search
2017-12-01
The Governors Office requested an annual financial analysis of the INDOT Research Program to determine the return on the research investment (ROI). The current financial analysis is for research projects that completed in FY 2016. Analyses on prev...
Hanford Site Environmental Safety and Health Fiscal Year 2001 Budget-Risk management summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
REEP, I.E.
1999-05-12
The Hanford Site Environment, Safety and Health (ES&H) Budget-Risk Management Summary report is prepared to support the annual request to sites in the U.S. Department of Energy (DOE) Complex by DOE, Headquarters. The request requires sites to provide supplementary crosscutting information related to ES&H activities and the ES&H resources that support these activities. The report includes the following: (1) A summary status of fiscal year (FY) 1999 ES&H performance and ES&H execution commitments; (2)Status and plans of Hanford Site Office of Environmental Management (EM) cleanup activities; (3) Safety and health (S&H) risk management issues and compliance vulnerabilities of FY 2001more » Target Case and Below Target Case funding of EM cleanup activities; (4) S&H resource planning and crosscutting information for FY 1999 to 2001; and (5) Description of indirect-funded S&H activities.« less
Hardy, Ellen E.; Dragos, Stefanie L.
1997-01-01
This report contains summaries of the progress of water-resources activities of the U.S. Geological Survey (USGS), Water Resources Division, Utah District, from October 1, 1995, to September 30, 1996. The waterresources program in Utah during this period consisted of 22 projects; a discussion of each project is presented in the main body of this report.The following sections outline the origin of the USGS, the mission of the Water Resources Division, the organizational structure of the Utah District, office addresses of the Utah District, the distribution of program funding as source of funds and type of activity funded in Federal Fiscal Year 1996 (FY96) (October 1, 1995, to September 30, 1996), and the agencies with which the District cooperates. The last part of the introduction is a list of reports produced by the District from October 1995 to September 1996.
2014-08-13
Small Business Category FY 2012 Navy Target Percentage FY 2013 Navy Target Percentage Small Business 15.75% 18.00% SDB 5.00% 5.50...9 FY 2013 Achievement Small Business Category FY 13 Target FY 13 Achievement % Difference Small Business 18.00% 29.93% +11.93% SDB 5.50...709,508,809 18.00% 29.93% SDB 704 $351,083,260 5.50% 14.81% VOSB * 462 $130,028,497 0.00% 5.49% SDVOSB 267 $87,214,636 2.00% 3.68% WOSB 327
Development Achievements for Fiscal 1990.
ERIC Educational Resources Information Center
Smoot, Joseph G.
This document presents the Fiscal Year (FY) 1990 report of Kansas' Pittsburg State University's (PSU) development program. The report addresses the annual fund, the campaign for distinction, the PSU foundation, and development plans for FY 1991. It includes an overview of FY 1990 activities and an executive summary. Among the findings presented…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoekstra, Robert J.; Hammond, Simon David; Richards, David
2017-09-01
This milestone is a tri-lab deliverable supporting ongoing Co-Design efforts impacting applications in the Integrated Codes (IC) program element Advanced Technology Development and Mitigation (ATDM) program element. In FY14, the trilabs looked at porting proxy application to technologies of interest for ATS procurements. In FY15, a milestone was completed evaluating proxy applications in multiple programming models and in FY16, a milestone was completed focusing on the migration of lessons learned back into production code development. This year, the co-design milestone focuses on extracting the knowledge gained and/or code revisions back into production applications.
Technology Development Report: CDDF, Dual Use Partnerships, SBIR/STTR: Fiscal Year 2003 Activities
NASA Technical Reports Server (NTRS)
Bailey, John W.
2004-01-01
The FY2003 NASA John C. Stennis Stennis Space Center (SSC) Technology Development Report provides an integrated report of all technology development activities at SSC. This report actually combines three annual reports: the Center Director's Discretionary Fund (CDDF) Program Report, Dual Use Program Report, and the Small Business Innovation Research (SBIR)/Small Business Technology Transfer (STTR) Program Report. These reports are integrated in one document to summarize all technology development activities underway in support of the NASA missions assigned to SSC. The Dual Use Program Report provides a summary review of the results and status of the nine (9) Dual Use technology development partnership projects funded and managed at SSC during FY2003. The objective of these partnership projects is to develop or enhance technologies that will meet the technology needs of the two NASA SSC Mission Areas: Propulsion Test and Earth Science Applications. During FY2003, the TDTO managed twenty (20) SBIR Phase II Projects and two (2) STTR Phase II Projects. The SBIR contracts support low TRL technology development that supports both the Propulsion Test and the Earth Science Application missions. These projects are shown in the SBIR/STTR Report. In addition to the Phase II contracts, the TDTO managed ten (10) SBIR Phase I contracts which are fixed price, six month feasibility study contracts. These are not listed in this report. Together, the Dual Use Projects and the SBIR/STTR Projects constitute a technology development partnership approach that has demonstrated that success can be achieved through the identification of the technical needs of the NASA mission and using various available partnership techniques to maximize resource utilization to achieve mutual technology goals. Greater use of these partnership techniques and the resource leveraging they provide, is a goal of the TDTO, providing more support to meet the technology development needs of the mission areas at SSC.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, GE; Diefenderfer, HL
The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration (BPA), U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included (1) subgroup meetings; (2) participation inmore » the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via BPA's project tracking system, Pisces; (4) quarterly project status reports; and (5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on FCRPS operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Gary E.; Diefenderfer, Heida L.
The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included 1) subgroup meetings; 2) participation in themore » estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, Pisces; 4) quarterly project status reports; and 5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on hydrosystem operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.« less
Fort Collins Science Center fiscal year 2010 science accomplishments
Wilson, Juliette T.
2011-01-01
The scientists and technical professionals at the U.S. Geological Survey (USGS), Fort Collins Science Center (FORT), apply their diverse ecological, socioeconomic, and technological expertise to investigate complicated ecological problems confronting managers of the Nation's biological resources. FORT works closely with U.S. Department of the Interior (DOI) agency scientists, the academic community, other USGS science centers, and many other partners to provide critical information needed to help answer complex natural-resource management questions. In Fiscal Year 2010 (FY10), FORT's scientific and technical professionals conducted ongoing, expanded, and new research vital to the science needs and management goals of DOI, other Federal and State agencies, and nongovernmental organizations in the areas of aquatic systems and fisheries, climate change, data and information integration and management, invasive species, science support, security and technology, status and trends of biological resources (including the socioeconomic aspects), terrestrial and freshwater ecosystems, and wildlife resources, including threatened and endangered species. This report presents selected FORT science accomplishments for FY10 by the specific USGS mission area or science program with which each task is most closely associated, though there is considerable overlap. The report also includes all FORT publications and other products published in FY10, as well as staff accomplishments, appointments, committee assignments, and invited presentations.
2017-08-04
This final rule will update the hospice wage index, payment rates, and cap amount for fiscal year (FY) 2018. Additionally, this rule includes new quality measures and provides an update on the hospice quality reporting program.
LBNL Laboratory Directed Research and Development Program FY2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ho, D.
2017-03-01
The Berkeley Lab Laboratory Directed Research and Development Program FY2016 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the supported projects and summarizes their accomplishments. It constitutes a part of the LDRD program planning and documentation process that includes an annual planning cycle, project selection, implementation and review.
Logistics Modernization Program System Procure-to-Pay Process Did Not Correct Material Weaknesses
2012-05-29
Prevalidation of DOD Commercial Payments,” March 2, 2007 Army U.S. Army Audit Agency Report No. A-2007-0205- FFM , “Logistics Modernization Program...Report No. A-2007-0163- FFM , “FY 03–FY 05 Obligations Recorded in the Logistics Modernization Program,” July 27, 2007 U.S. Army Audit Agency Report No
Military Construction and Family Housing Program. Fiscal Year (FY) 2001 Budget Estimates
2000-02-01
Department of the Air Force Military Construction and Family Housing Program Fiscal Year (FY) 2001 Budget Estimates Justification Data...Department of the Air Force Military Construction and Military Family Housing Program Summary Fiscal Year 2001 Appropriation Authorization Request... FISCAL YEAR 2001 (DOLLARS IN THOUSANDS) STATE/COUNTRY INSTALLATION TITLE APPROP REQUEST AUTH REQUEST PAGE INSIDE THE U.S. ALABAMA
ERIC Educational Resources Information Center
National Center for Educational Research and Development (DHEW/OE), Washington, DC.
In 1970 the National Center for Educational Research and Development (CER) reviewed United States Office of Education (USOE) Bureau of Research policies over the previous 15 years, and as a result of this review, initiated the Directed Research Program. This program will concentrate funds in four areas of high educational significance and will be…
Finney, John W; Amundson, Erin O; Bi, Xiaoyu; Cucciare, Michael A; Eisen, Seth A; Finlay, Andrea K; Halvorson, Max A; Hayashi, Ko; Owens, Douglas K; Maisel, Natalya C; Timko, Christine; Weitlauf, Julie C; Cronkite, Ruth C
2016-04-01
To evaluate the academic advancement and productivity of Department of Veterans Affairs Health Services Research and Development (HSR&D) Career Development Award (CDA) program recipients, National Institutes of Health (NIH) K awardees in health services research (HSR), and Agency for Healthcare Research and Quality (AHRQ) K awardees. In all, 219 HSR&D CDA recipients from fiscal year (FY) 1991 through FY2010; 154 NIH K01, K08, and K23 awardees FY1991-FY2010; and 69 AHRQ K01 and K08 awardees FY2000-FY2010 were included. Most data were obtained from curricula vitae. Academic advancement, publications, grants, recognition, and mentoring were compared after adjusting for years since award, and personal characteristics, training, and productivity prior to the award. No significant differences emerged in covariate-adjusted tenure-track academic rank, number of grants as primary investigator (PI), major journal articles as first/sole author, Hirsch h-index scores, likelihood of a journal editorship position or membership in a major granting review panel, or mentoring postgraduate researchers between the HSR&D CDA and NIH K awardees from FY1991-FY2010, or among the three groups of awardees from FY2000 or later. Among those who reported grant funding levels, HSR&D CDAs from FY1991-2010 had been PI on more grants of $100,000 than NIH K awardees. HSR&D CDAs had a higher mean number of major journal articles than NIH K awardees from FY1991-2010. Findings show that all three HSR career development programs are successfully selecting and mentoring awardees, ensuring additional HSR capacity to improve the quality and delivery of high-value care.
78 FR 28895 - Susan Harwood Training Grant Program, FY 2013
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-16
... Program, FY 2013 AGENCY: Occupational Safety and Health Administration (OSHA), Labor. ACTION: Notice of... Thursday, June 13, 2013, the application deadline date. ADDRESSES: The complete Susan Harwood Training... Order No. 1-2012 (77 FR 3912). Signed at Washington, DC, on May 13, 2013. David Michaels, Assistant...
75 FR 30908 - Notice of Funds Availability for FY 2010
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-02
... for the FY 2010 funding round of the Financial Education and Counseling (FEC) Pilot Program... Counseling Services to Prospective Homebuyers. The goals of grants that are awarded through the FEC Pilot Program are to identify successful methods of Financial Education and Counseling Services that result in...
75 FR 75666 - Advanced Placement (AP) Test Fee Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-06
... DEPARTMENT OF EDUCATION [CFDA No. 84.330B] Advanced Placement (AP) Test Fee Program AGENCY: Office... AP Test Fee fiscal year (FY) 2011 competition. SUMMARY: On September 1, 2010, we published in the Federal Register (75 FR 53681) a notice inviting applications for the AP Test Fee FY 2011 competition...
Fiscal Year 2007 Program Performance Plan
ERIC Educational Resources Information Center
US Department of Education, 2006
2006-01-01
The strategic goals and objectives set forth in the Department of Education's "FY (Fiscal Year) 2002-2007 Strategic Plan" form the context for the broad outcomes that the Department believes should characterize American education. The Department administers more than 150 programs in support of these goals and objectives. This "FY 2007 Program…
76 FR 5244 - Alternative Transportation in Parks and Public Lands Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-28
... Fiscal Year (FY) 2010 appropriations and previously unallocated prior year funds, for the Paul S... reserved for oversight activities, and $46,591 will be added to available FY 2011 appropriations for the... collaborative process. The goals of the program are to conserve natural, historical, and cultural resources...
DOT National Transportation Integrated Search
1998-02-01
This report is the fifth annual national review of activities funded under the : Congestion Mitigation and Air Quality Improvement (CMAQ) Program, covering : fiscal year (FY) 1996. It covers the distribution of funding among project : categories, an ...
Theoretical nuclear physics. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-05-01
As the three-year period FY93-FY96 ended, there were six senior investigators on the grant full-time: Bulgac, Henley, Miller, Savage, van Kolck and Wilets. This represents an increase of two members from the previous three-year period, achieved with only a two percent increase over the budget for FY90-FY93. In addition, the permanent staff of the Institute for Nuclear Theory (George Bertsch, Wick Haxton, and David Kaplan) continued to be intimately associated with our physics research efforts. Aurel Bulgac joined the Group in September, 1993 as an assistant professor, with promotion requested by the Department and College of Arts and Sciences bymore » September, 1997. Martin Savage, who was at Carnegie-Mellon University, jointed the Physics Department in September, 1996. U. van Kolck continued as research assistant professor, and we were supporting one postdoctoral research associate, Vesteinn Thorssen, who joined us in September, 1995. Seven graduate students were being supported by the Grant (Chuan-Tsung Chan, Michael Fosmire, William Hazelton, Jon Karakowski, Jeffrey Thompson, James Walden and Mitchell Watrous).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meyer, Ryan M.; Suter, Jonathan D.; Jones, Anthony M.
2014-09-12
This report documents FY14 efforts for two instrumentation subtasks under storage and transportation. These instrumentation tasks relate to developing effective nondestructive evaluation (NDE) methods and techniques to (1) verify the integrity of metal canisters for the storage of used nuclear fuel (UNF) and to (2) verify the integrity of dry storage cask internals.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-23
... DEPARTMENT OF EDUCATION Application Deadline for Fiscal Year (FY) 2012; Small, Rural School... for submission of fiscal year (FY) 2012 SRSA grant applications. An eligible LEA that is required to submit an application must do so electronically by the deadline in this notice. DATES: Application...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-02
...: Notice of Funding Availability (NOFA) for Fiscal Year (FY) 2010 Housing Counseling Grant Program AGENCY... requirements for the FY2010 Housing Counseling Grant NOFA. Approximately $79 million is made available through...), to support the delivery of a wide variety of housing counseling services to homebuyers, homeowners...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-04
...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Asthma Interventions in Public and..., funding criteria, and other requirements for the FY2010 Asthma Interventions in Public and Assisted... (CFDA) number for Asthma Interventions in Public and Assisted Multifamily Housing Grant Program is 14...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
... Interventions in Public and Assisted Multifamily Housing Program AGENCY: Office of Healthy Homes and Lead Hazard... Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2011 Asthma Interventions in Public and Assisted... Availability (NOFA) for the Fiscal Year (FY) 2011 Asthma Interventions in Public and Assisted Multifamily...
1990-01-01
effective ways of promoting U.S. interests. Finally, our Denton Amendment space-available transportation program continues assisting generous American hu... Eglin AFB, FL 9th SOS, Eglin AFB, FL 55th SOS, Eglin AFB, FL 1724th Special Tactics Squadron, Pope AFB, NC 67th SOS, RAF Woodbridge, UK 21st SOS...almost all of which were built from 1962 to 1966 - faced block obsolescence within a decade, and their missiles would not be effective against hardened
1981-01-01
the Position Location Reporting System/Joint Tactical Information Distributlo:; System Hybrid (ADDS) was approved by the Combat and Materiel Developers...Programs program. The establishment of a hybrid testbed will be Initiated in FY 1981 integrating the engint-ciag development models of Position...ad anticipated. 0.110 - This project was Increased by $1999 thousand in FT 1980 to support additional AD work on the hybrid collective protec- tion
Oak Ridge National Laboratory Health and Safety Long-Range Plan: Fiscal years 1989--1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-06-01
The health and safety of its personnel is the first concern of ORNL and its management. The ORNL Health and Safety Program has the responsibility for ensuring the health and safety of all individuals assigned to ORNL activities. This document outlines the principal aspects of the ORNL Health and Safety Long-Range Plan and provides a framework for management use in the future development of the health and safety program. Each section of this document is dedicated to one of the health and safety functions (i.e., health physics, industrial hygiene, occupational medicine, industrial safety, nuclear criticality safety, nuclear facility safety, transportationmore » safety, fire protection, and emergency preparedness). Each section includes functional mission and objectives, program requirements and status, a summary of program needs, and program data and funding summary. Highlights of FY 1988 are included.« less
The Defense Airborne Reconnaissance Office Unmanned Aerial Vehicle (UAV) Annual Report FY 1996.
1996-11-06
i>’ ’" UAV Annual Report FY1996 6 November 1996 L DEFENSE MRBOBNEiSCONNAGSAHCEC UAVANNUAL REPORT OUR SECOND UNMANNED AERIAL VEHICLE (UAV...ANNUAL REPORT provides an overview of the Defense Department’s UAV program activities for fiscal year (FY) 1996 . The Defense Airborne Reconnaissance...significant accomplishments that UAVs have achieved this past year, FY 1996 . Simply stated, UAVs are moving from words to deeds. They are being recognized in
Tactical Aircraft Modernization: Issues for Congress
2007-06-08
Investigations into the V-22 program, its crashes, and allegations of malfeasance came to a head in the spring of 2001. On May 1, 2001, a Blue...procurement of all weapons through FY2003 and would rise to 16% through FY2009 and 18% through FY2015. Representative Curt Weldon stated that since...the FY2000 defense budget. In the spring of 2003 F-22 affordability was again at issue. During an April 11 hearing of the House Government Reform
Computer Science Research Funding: How Much Is Too Little?
2009-06-01
Bioinformatics Parallel computing Computational biology Principles of programming Computational neuroscience Real-time and embedded systems Scientific...National Security Agency ( NSA ) • Missile Defense Agency (MDA) and others The various research programs have been coordinated through the DDR&E...DOD funding included only DARPA and OSD programs. FY07 and FY08 PBR funding included DARPA, NSA , some of the Services’ basic and applied research
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cartmell, D.B.
1995-09-01
Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ``Draft`` Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ``Draft`` MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The Kmore » Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million.« less
Proposed U.S. Space Weather Budget for Fiscal Year 2011 Would Fund Key Programs
NASA Astrophysics Data System (ADS)
Showstack, Randy
2010-09-01
The proposed U.S. federal budget for space weather research for fiscal year (FY) 2011 would provide funding for key space weather programs within several U.S. agencies, including NASA, NOAA, the National Science Foundation (NSF), and the Air Force. Funding for the programs comes ahead of the upcoming solar maximum, a period of the solar cycle with heightened solar activity, projected for 2013. Several officials indicated that while funding is not tied to a particular solar maximum or minimum, available assets could help with studying and preparing for the solar maximum. The proposed FY 2011 budget for the Heliophysics Division within NASA's Science Mission Directorate is $641.9 million, compared with the FY 2010 enacted budget of $627.4 million. Within the proposed budget is $166.9 million for heliophysics research, down slightly from $173 million for FY 2010. The proposed budget would include $31.7 million for heliophysics research and analysis (compared with $31 million for FY 2010); $66.7 million for “other missions and data analysis,” including Cluster II, the Advanced Composition Explorer (ACE), and the Time History of Events and Macroscale Interactions during Substorms (THEMIS) mission; and $48.9 million for sounding rockets.
Military Retirement: Background and Recent Developments
2016-04-06
facilities and programs. Currently, active component personnel are eligible for retirement or “vested” after completing 20 years of service ( YOS ) and have...Defined Benefit Calculations ............................... 4 “High Three” Eligibility and Defined Benefit Calculations...Retirement Eligibility Flowchart ................... 4 Tables Table 1. DOD Retired Military Personnel, Survivors, and Program Costs, FY2005- FY2014
NASA Technical Reports Server (NTRS)
LaBel, Kenneth A.; Sampson, Michael J.
2015-01-01
This presentation is a NASA Electronic Parts and Packaging (NEPP) Program: Roadmap for FY15 and Beyond. This roadmap provides a snapshot for current plans and collaborations on testing and evaluation of electronics as well as a discussion of the technology selection approach.
Library of Michigan FY 2000 LSTA Subgrant Program Guidelines.
ERIC Educational Resources Information Center
Michigan Library, Lansing.
This handbook provides FY (fiscal year) 2000 guidelines developed by the Library of Michigan for applying for LSTA (Library Services and Technology Act) subgrant funding. The handbook includes the following sections: (1) overview of the LSTA subgrant program; (2) general application guidelines for all funding areas; (3) required elements of the…
GLOBAL CHANGE RESEARCH NEWS #8: OUR CHANGING PLANET: THE FY2000 U.S. GLOBAL CHANGE RESEARCH PROGRAM
This edition of Global Change Research News focuses on the publication of the new OurChanging Planet: The FY2000 U.S. Global Change Research Program. This annual report to the Congress was prepared under the auspices ofthe President's National Science and Technology Council. It...
GLOBAL CHANGE RESEARCH NEWS #24: PUBLICATION OF FY2001 EDITION OF "OUR CHANGING PLANET"
The EPA Global Change Research Program is pleased to inform you of the publication of the new Our Changing Planet: The FY2001 U.S. Global Change Research Program. This annual report to the Congress was prepared under the auspices of the President's National Science and Technolog...
Institutional research and development, FY 1987
DOE Office of Scientific and Technical Information (OSTI.GOV)
Struble, G.L.; Lawler, G.M.; Crawford, R.B.
The Institutional Research and Development program at Lawrence Livermore National Laboratory fosters exploratory work to advance science and technology, disciplinary research to develop innovative solutions to problems in various scientific fields, and long-term interdisciplinary research in support of defense and energy missions. This annual report describes research funded under this program for FY87. (DWL)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-16
... Assistant Administrator for Management and CFO/CAO, Ocean Services and Coastal Zone Management. [FR Doc...-01] RIN 0648-ZC21 Extension of Award Period for FY 2007 Coastal and Estuarine Land Conservation....gov . SUPPLEMENTARY INFORMATION: The Coastal and Estuarine Land Conservation Program was established...
OPERATIONS AND RESEARCH AT THE U.S. EPA INCINERATION RESEARCH FACILITY: ANNUAL REPORT FOR FY94
Fiscal year 1994 (FY94, October 1, 1993 through September 30,1994) saw the continuation of incineration research testing efforts at the IRF. uring the year, two major pilot-scale programs were completed and a third carried to near-completion, and two bench-scale test programs of ...
LDRD 2017 Annual Report: Laboratory Directed Research and Development Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, Jack; Flynn, Liz
This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2017, as required. In FY 2017, the BNL LDRD Program funded 46 projects, 13 of which were new starts, at a total cost of $10.4M.
DOT National Transportation Integrated Search
1998-07-15
This report documents the assessment of the Constrained Long Range Plan (CLRP) and the FY99-2004 Transportation Improvement Program (TIP) with respect to air quality conformity requirements under the 1990 Clean Air Act Amendments. The assessment used...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-18
...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2011 Lead-Based Paint Hazard Control Grant Program and Lead Hazard Reduction Demonstration Grant Program and Amendment and Technical Corrections AGENCY: Office of Healthy Homes and Lead Hazard Control, HUD. ACTION: Notice of Availability and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
...-0182-02] FY 2010 NIST Center for Neutron Research (NCNR) Comprehensive Grants Program Extension of Due Date for Proposals AGENCY: National Institute of Standards and Technology (NIST), United States Department of Commerce. ACTION: Notice. SUMMARY: NIST publishes this notice to extend the deadline for...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-20
... DEPARTMENT OF EDUCATION [CFDA: Number 84.358A] Application Deadline for Fiscal Year (FY) 2013... establish the deadline for submission of fiscal year (FY) 2013 SRSA grant applications. An eligible LEA that is required to submit an application must do so electronically by the deadline in this notice. DATES...
ERIC Educational Resources Information Center
Michigan Library, Lansing.
This handbook provides FY (fiscal year) 2002 guidelines developed by the Library of Michigan for administering LSTA (Library Services and Technology Act) grants. The first section provides an overview of the LSTA program. The second section gives the grant timeline for FY 2002. The third section describes the award process, including award…
Navy Littoral Combat Ship (LCS)/Frigate Program: Background and Issues for Congress
2016-01-05
and is adding 20 berths to all seaframes. The increased berthing supports small increases in the size of the core crew, mission package detachments...for both the FY2009 ships and the FY2010 ships would determine the allocation of the three FY2010 ships, with the winning team getting two of the
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-13
...'s Fiscal Year (FY) 2010 NOFA for the Capital Fund Education and Community Facilities Program--Technical Correction and Extension of Deadline Date AGENCY: Office of the Chief Human Capital Officer, HUD... Availability (NOFA) for the Fiscal Year (FY) 2010 Capital Fund Education and Community Facilities (CFCF...
76 FR 4645 - Fusion Energy Sciences Advisory Committee; Notice of Open Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-26
..., 9 a.m. to 5 p.m.; Tuesday, March 8, 2011, 8:30 a.m. to 12 p.m. ADDRESSES: Doubletree Bethesda Hotel... year (FY) 2012 budget submission to Congress and to conduct other committee business. Tentative Agenda Items: Office of Science FY 2012 Congressional Budget Request FES Program FY 2012 Congressional Budget...
Managed care and the quality of substance abuse treatment.
Shepard, Donald S; Daley, Marilyn; Ritter, Grant A; Hodgkin, Dominic; Beinecke, Richard H
2002-12-01
In the US, the spiraling costs of substance abuse and mental health treatment caused many state Medicaid agencies to adopt managed behavioral health care (MBHC) plans during the 1990s. Although research suggests that these plans have successfully reduced public sector spending, their impact on the quality of substance abuse treatment has not been established. The Massachusetts Medicaid program started a risk-sharing contract with MHMA, a private, for-profit specialty managed behavioral health care (MBHC) carve-out vendor on July 1, 1992. This paper evaluates the carve-out s impact on spending per inpatient episode and three proxy measures of quality: (i) access to inpatient treatment (ii) 30-day re-admissions and (iii) continuity of care. Medicaid claims for inpatient treatment were collapsed into episodes. Clients were tracked across the five-year period and an interrupted time series design was used to compare the three quality outcomes and spending in the year prior to (FY1992) and the four years during MHMA (FY1993-FY1996). Logistic and linear regression models were used to control for race, disability status, age, gender and primary diagnosis. Despite a 99% reduction in the use of hospital-based settings, access to 24-hour services overall increased by 38%, largely due to an expansion in the use of freestanding detoxification and acute residential services. Continuity improved by 73%. Nevertheless, rates of 7-day (58%) and 30-day (24%) readmission increased significantly, even after controlling for increases in disability status. Per episode spending decreased by 76% ($2,773), characterized by a dramatic spending reduction in FY1993 that was maintained but not augmented in subsequent years. The carve-out had mixed effects on the quality of substance abuse treatment. While one of the three measures (readmission rates) deteriorated, two improved (access and continuity). Rapid re-admissions were strongly associated with shorter lengths of stay, suggesting that strengthening discharge planning may preserve the benefits of MBHC while avoiding its risks. Since reductions in Medicaid spending were impressive but finite, MBHC may not be the permanent solution to inflation in behavioral health care. MBHC firms should implement quality-monitoring programs to ensure that aggressive utilization management strategies do not compromise quality of care. The impact of managed behavioral health care should ideally be evaluated in randomized controlled studies. In addition, research is needed to establish that the quality measures employed in this evaluation - improved access, enhanced continuity and fewer rapid re-admissions actually correspond to reductions in drug or alcohol use and other favorable outcomes obtained through client self-report or urinalysis.
2005-05-31
building a new amphibious assault ship called LHD-8 and is also procuring new LPD-17 class amphibious ships. A total of 12 LPD-17s were originally planned ...but the FY2006-FY2011 Future Years Defense Plan (FYDP) proposes reducing that figure to nine, with the final two to be procured in FY2006 and FY2007...Three developments have caused the Navy to reconsider its plans for procuring amphibious ships, maritime prepositioning ships, and connector ships
NASA Technical Reports Server (NTRS)
Wynne, Eleanor C.
1994-01-01
The purpose is to present the Structural Dynamics Division's research accomplishments for F.Y. 1993 and research plans for F.Y. 1994. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Smith, Jacqueline G.; Gardner, James E.
1990-01-01
The purpose is to present the Structural Dynamics Division's research accomplishments for FY 1989 and research plans for FY 1990. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Gardner, J. E.; Dixon, S. C.
1986-01-01
The Langley Research Center Loads and Aeroelasticity Division's research accomplishments for FY85 and research plans for FY86 are presented. The rk under each branch (technical area) will be described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Gardner, James E.; Dixon, S. C.
1987-01-01
The Loads and Aeroelasticity Division's research accomplishments for FY 86 and research plans for FY 87 are presented. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Campbell, A.N.; Cole, E.I. Jr.; Tangyunyong, Paiboon
This report describes the first practical, non-invasive technique for detecting and imaging currents internal to operating integrated circuits (ICs). This technique is based on magnetic force microscopy and was developed under Sandia National Laboratories` LDRD (Laboratory Directed Research and Development) program during FY 93 and FY 94. LDRD funds were also used to explore a related technique, charge force microscopy, for voltage probing of ICs. This report describes the technical work performed under this LDRD as well as the outcomes of the project in terms of publications and awards, intellectual property and licensing, synergistic work, potential future work, hiring ofmore » additional permanent staff, and benefits to DOE`s defense programs (DP).« less
FY2016 Update on ILAW Glass Testing for Disposal at IDF
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, E. E.; Swanberg, D. J.; Muller, Isabelle S.
2017-04-12
This status report provides a FY2016 update on work performed to collect information on the corrosion behavior of LAW glasses to support the IDF PA. In addition to the development of the baseline operating envelope for the WTP, since 2003, VSL has developed a wide range of LAW formulations that achieve considerably higher waste loadings than the WTP baseline formulations.
Library User Survey, Summary Report FY 1990-FY 1992: Russell Library, Georgia College.
ERIC Educational Resources Information Center
Scott, R. Neil
This report summarizes data from surveys of users at the Georgia College library from 1989 to 1992. Results in the following areas are presented for each fiscal year (i.e., 1990, 1991, and 1992): (1) affiliation with the college and academic major; (2) status (i.e., faculty, staff, student class); (3) whether the library visit was in support of…
Information Resources Management Long Range Plan, FY 1995-1999
NASA Technical Reports Server (NTRS)
1994-01-01
Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Major IRM Program Accomplishments for FY 1993; Information Collection Budget; Summary of Computer Security Plans; Appendix: Acronym List.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report summarizes significant FY93 programmatic information and accomplishments relevant to the individual activities within the Office of Technology Development Program for Research, Development, Demonstration, Testing, and Evaluation (RDDT&E). A brief discussion of the mission of the Office of Environmental Restoration and Waste Management (EM) and the Office of Technology Development is presented. An overview is presented of the major problem areas confronting DOE. These problem areas include: groundwater and soils cleanup; waste retrieval and processing; and pollution prevention. The organizational elements within EM are highlighted. An EM-50 Funding Summary for FY92 and FY93 is also provided. RDDT&E programs aremore » discussed and their key problem areas are summarized. Three salient program-formulating concepts are explained. They are: Integrated Demonstrations, Integrated Programs, and the technology window of opportunity. Detailed information for each of the programs within RDDT&E is presented and includes a fact sheet, a list of technical task plans and an accomplishments and objectives section.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Atcitty, Stanley
The National Nuclear Security Agency (NNSA) created a Minority Serving Institution Partnership Plan (MSIPP) to 1) align investments in a university capacity and workforce development with the NNSA mission to develop the needed skills and talent for NNSA’s enduring technical workforce at the laboratories and production plants and 2) to enhance research and education at under-represented colleges and universities. Out of this effort, MSIPP launched a new program in early FY17 focused on Tribal Colleges and Universities (TCUs). The following report summarizes the project focus and status update during this reporting period.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Atcitty, Stanley
The National Nuclear Security Agency (NNSA) created a Minority Serving Institution Partnership Plan (MSIPP) to 1) align investments in a university capacity and workforce development with the NNSA mission to develop the needed skills and talent for NNSA’s enduring technical workforce at the laboratories and production plants and 2) to enhance research and education at under-represented colleges and universities. Out of this effort, MSIPP launched a new program in early FY17 focused on Tribal Colleges and Universities (TCUs). The following report summarizes the project focus and status update during this reporting period.
2016-08-05
This final rule will update the hospice wage index, payment rates, and cap amount for fiscal year (FY) 2017. In addition, this rule changes the hospice quality reporting program, including adopting new quality measures. Finally, this final rule includes information regarding the Medicare Care Choices Model (MCCM).
42 CFR 412.152 - Definitions for the Hospital Readmissions Reduction Program.
Code of Federal Regulations, 2012 CFR
2012-10-01
... disproportionate share of low-income patients under § 412.106, outliers under subpart F of this part, and a low.... The floor adjustment factor is set at 0.99 for FY 2013, 0.98 for FY 2014, and 0.97 for FY 2015 and... standardized amount adjusted for resource utilization by the applicable MS-DRG relative weight and adjusted for...
42 CFR 412.152 - Definitions for the Hospital Readmissions Reduction Program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... disproportionate share of low-income patients under § 412.106, outliers under subpart F of this part, and a low.... The floor adjustment factor is set at 0.99 for FY 2013, 0.98 for FY 2014, and 0.97 for FY 2015 and... standardized amount adjusted for resource utilization by the applicable MS-DRG relative weight and adjusted for...
42 CFR 412.152 - Definitions for the Hospital Readmissions Reduction Program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... disproportionate share of low-income patients under § 412.106, outliers under subpart F of this part, and a low.... The floor adjustment factor is set at 0.99 for FY 2013, 0.98 for FY 2014, and 0.97 for FY 2015 and... standardized amount adjusted for resource utilization by the applicable MS-DRG relative weight and adjusted for...
1982-02-08
although non-aligned, Malaysia , Indonesia, and Singapore support U.S. presence in South- east Asia and allow unhampered U.S. transit of the vital...modernization of obsolete facilities, maintenance of existing facilities, energy conservation, compliance with environmental and OSHA stan- dards, and NATO
U.S. Army Research Institute 1983 Annual Report
1983-10-01
Olllc») v TYPE OF REPORT a PERIOD COVERED Annual; TY 1983 6 PERFORMING ORG. REPORT NUMBER 6. CONTRACT OR GRANT NUMBERf«) 10. PROGRAM ELEMENT...AtTWACT tCmSm mm nrmam «M» W nmommmr —ä Idomlllr br Mock mnkw; An overview of the FY83 research program la presented in terms of these five research...awards, in-house publication«, professional publications and pres- entations, FY83 program management (mission, the core program , the three component
Metrication report to the Congress
NASA Technical Reports Server (NTRS)
1991-01-01
NASA's principal metrication accomplishments for FY 1990 were establishment of metrication policy for major programs, development of an implementing instruction for overall metric policy and initiation of metrication planning for the major program offices. In FY 1991, development of an overall NASA plan and individual program office plans will be completed, requirement assessments will be performed for all support areas, and detailed assessment and transition planning will be undertaken at the institutional level. Metric feasibility decisions on a number of major programs are expected over the next 18 months.
NASA's Microgravity Technology Report, 1996: Summary of Activities
NASA Technical Reports Server (NTRS)
Kierk, Isabella
1996-01-01
This report covers technology development and technology transfer activities within the Microgravity Science Research Programs during FY 1996. It also describes the recent major tasks under the Advanced Technology Development (ATD) Program and identifies current technology requirements. This document is consistent with NASA,s Enteprise for the Human Exploration and development of Space (HEDS) Strategic Plan. This annual update reflects changes in the Microgravity Science Research Program's new technology activities and requirements. Appendix A. FY 1996 Advanced Technology Development. Program and Project Descriptions. Appendix B. Technology Development.
Federal Geothermal Research Program Update Fiscal Year 1999
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2004-02-01
The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal and Wind Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The following mission and goal statements guide the overall activities of the Office of Geothermal and Wind Technologies. This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 1999. The information contained in this Research Update illustrates howmore » the mission and goals of the Office of Geothermal and Wind Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ohi, J.
Supporting analysis and assessments can provide a sound analytic foundation and focus for program planning, evaluation, and coordination, particularly if issues of hydrogen production, distribution, storage, safety, and infrastructure can be analyzed in a comprehensive and systematic manner. The overall purpose of this activity is to coordinate all key analytic tasks-such as technology and market status, opportunities, and trends; environmental costs and benefits; and regulatory constraints and opportunities-within a long-term and systematic analytic foundation for program planning and evaluation. Within this context, the purpose of the project is to help develop and evaluate programmatic pathway options that incorporate near andmore » mid-term strategies to achieve the long-term goals of the Hydrogen Program. In FY 95, NREL will develop a comprehensive effort with industry, state and local agencies, and other federal agencies to identify and evaluate programmatic pathway options to achieve the long-term goals of the Program. Activity to date is reported.« less
2013-01-01
Background Interventions providing foods fortified with multiple micronutrients can be a cost-effective and sustainable strategy to improve micronutrient status and physical growth of school children. We evaluated the effect of micronutrient-fortified yoghurt on the biochemical status of important micronutrients (iron, zinc, iodine, vitamin A) as well as growth indicators among school children in Bogra district of Bangladesh. Methods In a double-masked randomized controlled trial (RCT) conducted in 4 primary schools, 1010 children from classes 1–4 (age 6–9 years) were randomly allocated to receive either micronutrient fortified yoghurt (FY, n = 501) or non-fortified yoghurt (NFY, n = 509). For one year, children were fed with 60 g yoghurt everyday providing 30% RDA for iron, zinc, iodine and vitamin A. Anthropometric measurements and blood/urine samples were collected at base-, mid- and end-line. All children (FY, n = 278, NFY, n = 293) consenting for the end-line blood sample were included in the present analyses. Results Both groups were comparable at baseline for socio-economic status variables, micronutrient status markers and anthropometry measures. Compliance was similar in both the groups. At baseline 53.4% of the population was anemic; 2.1% was iron deficient (ferritin <15.0 μg/L and TfR > 8.3 mg/L). Children in the FY group showed improvement in Hb (mean difference: 1.5; 95% CI: 0.4-2.5; p = 0.006) as compared to NFY group. Retinol binding protein (mean diff: 0.05; 95% CI: 0.002-0.09; p = 0.04) and iodine levels (mean difference: 39.87; 95% CI: 20.39-59.35; p < 0.001) decreased between base and end-line but the decrease was significantly less in the FY group. Compared to NFY, the FY group had better height gain velocity (mean diff: 0.32; 95% CI: 0.05-0.60; p = 0.02) and height-for-age z-scores (mean diff: 0.18; 95% CI: 0.02-0.33; p = 0.03). There was no difference in weight gain velocity, weight-for-age z-scores or Body Mass Index z-scores. Conclusion In the absence of iron deficiency at baseline the impact on iron status would not be expected to be observed and hence cannot be evaluated. Improved Hb concentrations in the absence of a change in iron status suggest improved utilization of iron possibly due to vitamin A and zinc availability. Fortification improved height gain without affecting weight gain. Trial registration ClinicalTrial.gov: NCT00980733 PMID:23714325
Human genome. 1993 Program report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-03-01
The purpose of this report is to update the Human Genome 1991-92 Program Report and provide new information on the DOE genome program to researchers, program managers, other government agencies, and the interested public. This FY 1993 supplement includes abstracts of 60 new or renewed projects and listings of 112 continuing and 28 completed projects. These two reports, taken together, present the most complete published view of the DOE Human Genome Program through FY 1993. Research is progressing rapidly toward 15-year goals of mapping and sequencing the DNA of each of the 24 different human chromosomes.
Review of the Fiscal Year 2014 (FY14) Defense Environmental International Cooperation (DEIC) Program
2015-05-01
spell out) originating request, including DoD action officer, email address, and commercial and DSN phone number ; 3. Description...does not display a currently valid OMB control number . 1. REPORT DATE MAY 2015 2. REPORT TYPE 3. DATES COVERED 4. TITLE AND SUBTITLE Review...of the Fiscal Year 2014 (FY14) Defense Environmental International Cooperation (DEIC) Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM
Annual Progress Report Fiscal Year 1982.
1982-09-30
255 Work Jnit No. 82/43 (FY82,O) A\\dolescent Immunity to Varicella and Cytomegalovirus .............. 256 Work Unit No. 82/45 (FY82,O) V!1-26 In...with technetium-99m bone agent(Infarct avid) radiopharmaceuticals. Presented at the New Mexico Society of Internal Medicine, Albuquerque NM, 11-12 Dec...No: 82/43 Status: Ongoing Title: Adolescent Immunity to Varicella and Cytomegalovirus Start Date: Est Comp Date: Principal Investigator: Facility: LTC
ASC-AD penetration modeling FY05 status report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kistler, Bruce L.; Ostien, Jakob T.; Chiesa, Michael L.
2006-04-01
Sandia currently lacks a high fidelity method for predicting loads on and subsequent structural response of earth penetrating weapons. This project seeks to test, debug, improve and validate methodologies for modeling earth penetration. Results of this project will allow us to optimize and certify designs for the B61-11, Robust Nuclear Earth Penetrator (RNEP), PEN-X and future nuclear and conventional penetrator systems. Since this is an ASC Advanced Deployment project the primary goal of the work is to test, debug, verify and validate new Sierra (and Nevada) tools. Also, since this project is part of the V&V program within ASC, uncertaintymore » quantification (UQ), optimization using DAKOTA [1] and sensitivity analysis are an integral part of the work. This project evaluates, verifies and validates new constitutive models, penetration methodologies and Sierra/Nevada codes. In FY05 the project focused mostly on PRESTO [2] using the Spherical Cavity Expansion (SCE) [3,4] and PRESTO Lagrangian analysis with a preformed hole (Pen-X) methodologies. Modeling penetration tests using PRESTO with a pilot hole was also attempted to evaluate constitutive models. Future years work would include the Alegra/SHISM [5] and AlegrdEP (Earth Penetration) methodologies when they are ready for validation testing. Constitutive models such as Soil-and-Foam, the Sandia Geomodel [6], and the K&C Concrete model [7] were also tested and evaluated. This report is submitted to satisfy annual documentation requirements for the ASC Advanced Deployment program. This report summarizes FY05 work performed in the Penetration Mechanical Response (ASC-APPS) and Penetration Mechanics (ASC-V&V) projects. A single report is written to document the two projects because of the significant amount of technical overlap.« less
Yabe, Hirooki; Suzuki, Yuriko; Mashiko, Hirobumi; Nakayama, Yoko; Hisata, Mitsuru; Niwa, Shin-Ichi; Yasumura, Seiji; Yamashita, Shunichi; Kamiya, Kenji; Abe, Masafumi
2014-01-01
On 11 March 2011, the Great East Japan Earthquake followed by a gigantic tsunami hit the Pacific coast of Northeast Japan (Tohoku) and damaged Tokyo Electric Power Company's Fukushima Daiichi Nuclear Power Plant, causing a radiation hazard in the entire Fukushima Prefecture. The radiation dose exposed either externally and internally in Fukushima residents have been evaluated to be low so far and it is hardly believed that they may have any direct radiation risk on physical condition. The purpose of this report is, therefore, to describe results of a mental health and lifestyle survey intended to facilitate adequate care for residents who are at a higher risk of developing mental health problems after the complicated accident. The target population of this survey is the residents of evacuation zones including Hirono Town, Naraha Town, Tomioka Town, Kawauchi Village, Okuma Town, Futaba Town, Namie Town, Katsurao Village, Minamisoma City, Tamura City, Yamakiya district of Kawamata Town, and Iitate Village. The targeted population was 210,189 in fiscal year 2011 (FY2011) and 211,615 in fiscal year 2012 (FY2012). Questionnaires have been mailed since January 2012, and subsequently, January 2013, 10 and 22 months after the disaster. Among of them, children 63.4%, adults 40.7% for FY2011, and children 41.0%, adults 29.7% for FY2012 responded to the questionnaires mailed. Sociodemographic data showed that many evacuee households were separated after the disaster and had to move several times. K6 was used in this survey to estimate general mental health. The proportion (14.6% in FY2011 and 11.9% inFY2012) of adults who scored above the K6 cut-off (≥13) for general mental health was higher than usual, indicating severe mental health problems among evacuees. The proportion (21.6% in FY2011 and 18.3% inFY2012) of adults who scored above the cut-off (≥44) of PTSD checklist (PCL), reflecting traumatic symptoms, was almost equal to that of the workers after the 9.11 World Trade Center attacks. These results also indicate the presence of severe traumatic problems among evacuees. The proportions of children (4-6 years old) and children of primary school age (6-12 years old) who scored above the cut-off (≥16) of Strengths and Difficulties Questionnaire (SDQ) reflecting the mental health status in children, 24.4% and 22.0% in the survey of FY2011, were double the usual state respectively, whereas 16.6% in children of 4-6 years old and 15.8% in children of 6-12 years old in FY2012 were 1.5 times. These findings also disclosed the presence of severe mental difficulties in children, with relative improvement year by year. As revealed by the present mental health survey, the earthquake and tsunami followed by the nuclear accident caused psychological distress among residents in Fukushima prefecture. Continuous survey and mental care programs are required.
2017-08-03
This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2018 as required by the statute. As required by section 1886(j)(5) of the Social Security Act (the Act), this rule includes the classification and weighting factors for the IRF prospective payment system's (IRF PPS) case-mix groups and a description of the methodologies and data used in computing the prospective payment rates for FY 2018. This final rule also revises the International Classification of Diseases, 10th Revision, Clinical Modification (ICD-10-CM) diagnosis codes that are used to determine presumptive compliance under the "60 percent rule," removes the 25 percent payment penalty for inpatient rehabilitation facility patient assessment instrument (IRF-PAI) late transmissions, removes the voluntary swallowing status item (Item 27) from the IRF-PAI, summarizes comments regarding the criteria used to classify facilities for payment under the IRF PPS, provides for a subregulatory process for certain annual updates to the presumptive methodology diagnosis code lists, adopts the use of height/weight items on the IRF-PAI to determine patient body mass index (BMI) greater than 50 for cases of single-joint replacement under the presumptive methodology, and revises and updates measures and reporting requirements under the IRF quality reporting program (QRP).
Overview of Doing Business with SPAWAR Systems Command (SPAWAR)
2011-08-22
School Girls Day Out FY07 – 1 school FY08 – 34 schools FY09 – 35 schools FY10 – 47 schools Material World Modules International Autonomous Underwater...s it e , a n d a ls o f rom t h e foll o vn n g link: e-CC Self -Service News The 23rd P.nnual Na v y Gold Coast Small Business O pportunity Conf...Opportunities 1. Requirements Office: Joint Program Manager - Information Systems (JPMIS) 2. Joint Effects Model (JEM) Increment 1 Sustainment 3
1981-01-01
ACTIVITIES .......... ............................ 111-548 3/ de ~ &04A.... ~UNCLASSIFIED xiii 0- 4 UNCLASSIFIED FY 1932 ROTE CONGRESSIONAI. DESCRIPTIVE...Title: Comeunicatiois gnlineerin De -elo pmnt DOD Mission Area: i256 - Tactical Communications Sudget Activity: 04 - TactictI Programs Into the...tconditions ot heavy miiltary traffic, high speeds, and severe weather. Army Remote Sensors (REMS) were used to provide 4-cnrity of the Olympic Village complex
NASA Technical Reports Server (NTRS)
Wynne, Eleanor C.
1993-01-01
The purpose of this paper is to present the Structural Dynamics Division's research accomplishments for F.Y. 1992 and research plans for F.Y. 1993. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Dixon, S. C.; Gardner, James E.
1988-01-01
The purpose of this paper is to present the Loads and Aeroelasticity Division's research accomplishments for FY87 and research plans for FY88. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
Interior, Environment, and Related Agencies: FY2007 Appropriations
2007-03-07
reported bill for FY2007, from the FY2006 level, were the following: ! $-209.5 million (9%) for the National Park Service (NPS); ! $-153.5 million (10%) for...Humphries RSI 7-7264 mhumphries@crs.loc.gov National Park Service David Whiteman RSI 7-7786 dwhiteman@crs.loc.gov Payments in Lieu of Taxes Program (PILT) M...11 National Wildlife Refuge System and Law Enforcement . . . . . . . . . . 12 Avian Flu
State, Foreign Operations, and Related Programs: FY2009 Appropriations
2008-11-20
including political, security, social environment, and best ways to engage local populations) in designing new embassies buildings. In the funding...political, economic, and social reforms. The President initially promised $5 billion annually by FY2006, although funds requested and appropriated...other areas.11 In FY2008, BBG proposed to reduce or eliminate radio broadcasting in a number of services, including Cantonese , Ukrainian, Tibetan
FY 1978 Budget, FY 1979 Authorization Request and FY 1978-1982 Defense Programs,
1977-01-17
technological opportunities with defense applica- tions -- such as long-range cruise missiles and guidance, improved sensors, 25 miniaturization, and computer ...Various methods exist for computing the number of theater nuclear weapons needed to perform these missions with an acceptable level of confidence...foreign military forces. Mini-micro computers are especially interesting. -- Finally, since geography remains important, we must recognize that the
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2013
2013-01-01
In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on-years) the County…
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2010
2010-01-01
In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on-years) the County…
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2009
2009-01-01
In November 1996, the voters of Montgomery County approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on-years) the County Council would…
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2012
2012-01-01
In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on years) the County…
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2006
2006-01-01
In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on years) the County…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
The project is a significant part of Hawthorne Army Ammunition Depot`s effort to achieve a 20-percent reduction in energy consumption by FY2000 versus FY1985 baseline levels. The project will also assure that heating services are provided to Industrial Area facilities on a continuing basis, supporting mission requirements.
1997-04-10
The audit objective was to determine the accuracy and completeness of the audit of the U.S. Army Corps of Engineers, Civil Works Program, FY 1996...financial statements conducted by the Army Audit Agency. See Appendix C for a discussion of the audit process.
NASA Technical Reports Server (NTRS)
Stephens, J. R.
1982-01-01
The COSAM program for reduction of the use of strategic alloying elements in nickel-based superalloys for gas turbine engines was reviewed. Sources, consumption, and pricing of cobalt, tantalum, columbium, and chromium are surveyed. Research projects in strategic element substitution, advanced processing concepts, and the development of alternate materials (intermetallics and iron-base alloys) are listed and research plans for FY 1983 and FY 1984 summarized.
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2007
2007-01-01
In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on years) the County…
FY 1986 science budget overview
NASA Astrophysics Data System (ADS)
Richman, Barbara T.; Robb, David W.
Continental lithosphere research, scientific ocean drilling, investigative surveys in the Exclusive Economic Zone, and the Mars Observer were among those programs that fared best in the federal budget proposal for fiscal year (FY) 1986 that President Ronald Reagan sent to Congress last week. However, the Sea Grant and Coastal Zone Management programs were among those that fell victim to the budget ax once again.
DOE Office of Scientific and Technical Information (OSTI.GOV)
OGEKA,G.J.
1998-12-31
In FY 1998, the BNL LDBD Program funded 20 projects, 4 of which were new starts, at a total cost of $2,563,681. The small number of new starts was a consequence of severe financial problems that developed between FY 1997 and 1998. Emphasis was given to complete funding for approved multi-year proposals. Following is a table which lists all of the FY 1998 funded projects and gives a history of funding for each by year. Several of these projects have already experienced varying degrees of success as indicated in the individual Project Program Summaries which follow. A total of 17more » informal publications (abstracts, presentations, BNL reports and workshop papers) were reported and an additional 13 formal (full length) papers were either published, are in press or being prepared for publication. The investigators on five projects have filed for a patent. Seven of the projects reported that proposals/grants had either been funded or were submitted for funding. In conclusion, a significant measure of success is already attributable to the FY 1998 LDBD Program in the short period of time involved. The Laboratory has experienced a significant scientific gain by these achievements.« less
NREL Energy Storage Projects. FY2014 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pesaran, Ahmad; Ban, Chunmei; Burton, Evan
2015-03-01
The National Renewable Energy Laboratory supports energy storage R&D under the Office of Vehicle Technologies at the U.S. Department of Energy. The DOE Energy Storage Program’s charter is to develop battery technologies that will enable large market penetration of electric drive vehicles. These vehicles could have a significant impact on the nation’s goal of reducing dependence on imported oil and gaseous pollutant emissions. DOE has established several program activities to address and overcome the barriers limiting the penetration of electric drive battery technologies: cost, performance, safety, and life. These programs are; Advanced Battery Development through the United States Advanced Batterymore » Consortium (USABC); Battery Testing, Analysis, and Design; Applied Battery Research (ABR); and Focused Fundamental Research, or Batteries for Advanced Transportation Technologies (BATT) In FY14, DOE funded NREL to make technical contributions to all of these R&D activities. This report summarizes NREL’s R&D projects in FY14 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY14 projects under NREL’s Energy Storage R&D program are briefly described below. Each of these is discussed in depth in this report.« less
Research and development strategic plan : FY2013-FY2017.
DOT National Transportation Integrated Search
2013-05-01
This plan describes the strategy through which the Federal Railroad Administrations (FRAs) research and development (R&D) program will support the Department of Transportations (DOTs) mission and goals. Safety is the DOTs primary strat...
50 CFR 86.41 - How long will the money be available?
Code of Federal Regulations, 2010 CFR
2010-10-01
... INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE... obligation for a total of three fiscal years (e.g. FY 2000 funds will remain available through FY 2002) (16 U...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-03
... Billing for Skilled Nursing Facilities for FY 2014; Correction AGENCY: Centers for Medicare & Medicaid...; Prospective Payment System and Consolidated Billing for Skilled Nursing Facilities for FY 2014.'' DATES: These...
2009-06-03
This interim final rule with comment period implements revised Medicare severity long-term care diagnosis-related group (MS-LTC-DRG) relative weights for payment under the long-term care hospital (LTCH) prospective payment system (PPS) for federal fiscal year (FY) 2009. We are revising the MS-LTC-DRG relative weights for FY 2009 due to the misapplication of our established methodology in the calculation of the budget neutrality factor. The revised FY 2009 MS-LTC-DRG relative weights are effective for the remainder of FY 2009 (that is, from June 3, 2009 through September 30, 2009).
National NIF Diagnostic Program Fiscal Year 2002 Second Quarter Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
MacGowan, B
Since October 2001 the development of the facility diagnostics for NIF has been funded by the NIF Director through the National NIF Diagnostic Program (NNDP). The current emphasis of the NNDP is on diagnostics for the early NIF quad scheduled to be available for experiment commissioning in FY03. During the past six months the NNDP has set in place processes for funding diagnostics, developing requirements for diagnostics, design reviews and monthly status reporting. Those processes are described in an interim management plan for diagnostics (''National NIF Diagnostic Program Interim Plan'', NIF-0081315, April 2002) and a draft Program Execution Plan (''Programmore » Execution Plan for the National NlF Diagnostic Program'', NIF-0072083, October 2001) and documents cited therein. Work has been funded at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Naval Research Laboratory (NRL), Sandia National Laboratories (SNL), Bechtel Nevada at Los Alamos and Santa Barbara. There are no major technical risks with the early diagnostics. The main concerns relate to integration of the diagnostics into the facility, all such issues are being worked. This report is organized to show the schedule and budget status and a summary of Change Control Board actions for the past six months. The following sections then provide short descriptions of the status of each diagnostic. Where design reviews or requirements documents are cited, the documents are available on the Diagnostics file server or on request.« less
Rep. Cao, Anh "Joseph" [R-LA-2
2009-03-31
House - 10/08/2009 FOR FURTHER ACTION, see H.R. 3633. (All Actions) Notes: For further action, see S.1694, which became Public Law 111-96 on 11/6/2009. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
Rep. Cao, Anh "Joseph" [R-LA-2
2009-07-27
House - 10/08/2009 FOR FURTHER ACTION, see H.R. 3633. (All Actions) Notes: For further action, see S.1694, which became Public Law 111-96 on 11/6/2009. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
Insufficient Governance Over Logistics Modernization Program System Development
2010-11-02
Controls Over the Prevalidation of DOD Commercial Payments,” March 2, 2007 Army USAAA Report No. A-2007-0205- FFM , “Logistics Modernization Program...0163- FFM , “FY 03–FY 05 Obligations Recorded in the Logistics Modernization Program,” July 27, 2007 USAAA Report No. A-2007-0154-ALR, “Follow up...Audit of Aged Accounts–U.S. Army Communications-Electronics Life Cycle Management Command,” July 2, 2007 USAAA Report No. A-2006-0234- FFM
Photovoltaic Subcontract Program. Annual report, FY 1992
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-03-01
This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R&D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT) project,more » PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less
Wisconsin Vocational Equity Leadership Cadre Support Project. Final Report. FY96.
ERIC Educational Resources Information Center
Riley, Linda L.
A project provided technical assistance and support to the Wisconsin Vocational Equity Leadership Cadre to enable them to assist local districts in meeting the equity assurances in the Carl D. Perkins Vocational and Applied Technology Education Act of 1990. Approximately 80 members of the cadre, educators responsible for providing regional…
Consolidated Appropriations Act, 2012
Rep. Culberson, John Abney [R-TX-7
2011-05-31
12/23/2011 Became Public Law No: 112-74. (TXT | PDF) (All Actions) Notes: The measure is the vehicle for making appropriations for most federal government operations for the remainder of FY2012. Tracker: This bill has the status Became LawHere are the steps for Status of Legislation:
LDRD 2012 Annual Report: Laboratory Directed Research and Development Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bookless, William
Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY2012, as required. In FY2012, the BNL LDRD Program funded 52 projects, 14 of which were new starts, at a total cost of $10,061,292.
LDRD 2015 Annual Report: Laboratory Directed Research and Development Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hatton, D.
Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy (DOE) in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2015, as required. In FY 2015, the BNL LDRD Program funded 43 projects, 12 of which were new starts, at a total cost of $9.5M.
Summary of Pellet Technology Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gebhart, III, Gerald E.; Baylor, Larry R.; Bell, Gary L.
This report summarizes the activities and budget information of ORNL’s pellet technology program from the start of FY2014 through FY2017. Cost summaries are broken down by year and spending category. Milestone activities are outlined and described by year and further described in the project narrative. The project narrative outlines the main pellet injection technology advances enabled by the pellet technology program. A list of published research products is included, along with biographies of personnel involved. This document was prepared in support of the April 24, 2018, review of the pellet technology program at ORNL.
A profile of Hawaiians in the Medicaid Fee-For-Service program.
Loke, M; Kang-Kaulupali, K T; Honbo, L
2001-09-01
In Hawai'i, the Medicaid Fee-For-Service (FFS) program enrolled approximately 39,000 individuals in fiscal year (FY) 1999. This program specifically provides healthcare services to enrollees classified as aged, blind, disabled, in-state foster children, and children who live out-of-state in subsidized adoptions. The total expenditure associated with this program was over $300 million in FY 1999. Nearly 4,600 enrollees in the Medicaid FFS program were self-identified as Native Hawaiians or part-Hawaiians. Although the proportion of Hawaiians in the Medicaid program was a fair representation of Hawaiians in the state, the distribution by recipient category within the program was in sharp contrast. Aged Hawaiians appeared to be under-represented in the program while disabled Hawaiians were overrepresented. Foster children and children under subsidized adoption accounted for 1% of the total Hawaiian population. Excluding the foster children and children under subsidized adoption, recipients of Hawaiian ancestry in the Medicaid FFS program (aged, blind, and disabled) obtained health care services amounting to approximately $34 million in FY 1999. Females in this population received more services, with total Medicaid payments amounting to $18.7 million. A higher proportion of Hawaiian recipients were on the neighbor islands. In this FFS Hawaiian population, the top three disease-states by dollar volume in FY 1999, were Alzheimer's disease, acute cerebrovascular disease, and profound mental retardation. A total of $3 million in services were provided to recipients with these primary disease-states. The five leading disease-states facing Hawaiians were generally comparable to those confronting the overall FFS population.
Defense: FY2013 Authorization and Appropriations
2012-09-05
dollars and overturn several cost- cutting initiatives incorporated in the Administration’s budget, including proposed reductions in the Air Force...deficit reduction through FY2021 of $2.1 trillion). In FY2013, the BCA requires an across the board cut in budget authority (or “sequester”) that would...some $59 billion—about 10 percent—would be cut from the Administration’s budget request, with equal percentages cut from each program, project
FY 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2016-03-01
This year’s summary report updates the Fiscal Year 2016 Stockpile Stewardship and Management Plan (FY 2016 SSMP), the 25-year strategic program of record that captures the plans developed across numerous NNSA programs and organizations to maintain and modernize the scientific tools, capabilities, and infrastructure necessary to ensure the success of NNSA’s nuclear weapons mission. The SSMP is a companion to the Prevent, Counter, and Respond: A Strategic Plan to Reduce Global Nuclear Threats (FY 2017-2021) report, the planning document for NNSA’s nuclear threat reduction mission. New versions of both reports are published each year in response to new requirements andmore » challenges. Much was accomplished in FY 2015 as part of the program of record described in this year’s SSMP. The science-based Stockpile Stewardship Program allowed the Secretaries of Energy and Defense to certify for the twentieth time that the stockpile remains safe, secure, and effective without the need for underground nuclear explosive testing. The talented scientists, engineers, and technicians at the three national security laboratories, the four nuclear weapons production plants, and the national security site are primarily responsible for this continued success. Research, development, test, and evaluation programs have advanced NNSA’s understanding of weapons physics, component aging, and material properties through first-of-a-kind shock physics experiments, along with numerous other critical experiments conducted throughout the nuclear security enterprise. The multiple life extension programs (LEPs) that are under way made progress toward their first production unit dates. The W76-1 LEP is past the halfway point in total production, and the B61-12 completed three development flight tests. Critical to this success is the budget. The Administration’s budget request for NNSA’s Weapons Activities has increased for all but one of the past seven years, resulting in a total increase of approximately 45 percent since 2010. If adopted by Congress, the FY 2017 budget request will increase funding by $396 million (about 4.5 percent) from the enacted FY 2016 level. A significant portion of the increase would fund the research for multiple life extension programs, support the programs in Directed Stockpile Work, and modernize the physical infrastructure of the nuclear security enterprise.« less
US Navy FY 1997 Research Program
1997-09-30
US NAVY FY 1997 RESEARCH PROGRAM Henry E. Bass National Center for Physical Acoustics University of Mississippi University, MS 38677 Phone: (601...232-5905 Fax: (601) 232-7494 Email: pabass@olemiss.edu Award Number: N00014-95-1-1306 LONG-TERM GOALS The National Center for Physical Acoustics ...NCPA) provides an integrated physical acoustics laboratory to facilitate research in sound propagation and attenuation, molecular and chemical physics
ERIC Educational Resources Information Center
Mississippi Band of Choctaw Indians, Philadelphia.
Self-determination for the Choctaw tribal government and its people was reflected in the progress made in program development. Programs in effect during fiscal year (FY) 1973 covered the full range of economic and social needs of the Choctaw people. Designed to complement the progress achieved during FY 1972, the following four developmental…
Microgravity Science and Applications. Program Tasks and Bibliography for FY 1993
NASA Technical Reports Server (NTRS)
1994-01-01
An annual report published by the Microgravity Science and Applications Division (MSAD) of NASA is presented. It represents a compilation of the Division's currently-funded ground, flight and Advanced Technology Development tasks. An overview and progress report for these tasks, including progress reports by principal investigators selected from the academic, industry and government communities, are provided. The document includes a listing of new bibliographic data provided by the principal investigators to reflect the dissemination of research data during FY 1993 via publications and presentations. The document also includes division research metrics and an index of the funded investigators. The document contains three sections and three appendices: Section 1 includes an introduction and metrics data, Section 2 is a compilation of the task reports in an order representative of its ground, flight or ATD status and the science discipline it represents, and Section 3 is the bibliography. The three appendices, in the order of presentation, are: Appendix A - a microgravity science acronym list, Appendix B - a list of guest investigators associated with a biotechnology task, and Appendix C - an index of the currently funded principal investigators.
Comprehensive Monitoring Program: Air Quality Data Assessment Report for FY90. Volume 2. Version 3.1
1991-09-01
91311R01 If VERSION 3.10) VOLUME II Comm 2ND COPY COMPREHENSIVE MONITORING PROGRAM Contract Number DAAAI5-87-0095 AIR QUALITY DATA ASSESSMENT REPORT...MONITORING PROGRAM. FINAL AIR QUALITY DATA ASSESSMENT REPORT FOR FY90, VERSION 3.1 NONE 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRES.S(S) 8...RELEASE; DISTRIBUTION IS UNLIMITED 13. ABSTRACT (Maximum 200 words) THE OBJECTIVE OF THIS CMP IS TO: VERIFY AND EVALUATE POTENTIAL AIR QUALITY HEALTH
2015-04-01
in the Environments of Space and Testing (EP TEMPEST ) - Program Review (Briefing Charts) 5a. CONTRACT NUMBER In-House 5b. GRANT NUMBER 5c...of Space and Testing (EP TEMPEST ) AFOSR T&E Program Review 13-17 April 2015 Dr. Daniel L. Brown In-Space Propulsion Branch (RQRS) Aerospace Systems...Statement A: Approved for public release; distribution is unlimited. EP TEMPEST (Lab Task, FY14-FY16) Program Goals and Objectives Title: Electric
FY98 Class Convening Schedule for Coast Guard Class
DOT National Transportation Integrated Search
1998-08-12
This Notice publishes the FY98 class convening schedule of Coast Guard Class "A" : and "C" resident and exportable training courses defined by program/force : managers as essential or directly related to mission accomplishment for : achievement of pr...
Laboratory Directed Research and Development FY 2000 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Al-Ayat, R
This Annual Report provides an overview of the FY2000 Laboratory Directed Research and Development (LDRD) Program at Lawrence Livermore National Laboratory (LLNL) and presents a summary of the results achieved by each project during the year.
FY16 Status Report for the Uranium-Molybdenum Fuel Concept
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bennett, Wendy D.; Doherty, Ann L.; Henager, Charles H.
2016-09-22
The Fuel Cycle Research and Development program of the Office of Nuclear Energy has implemented a program to develop a Uranium-Molybdenum metal fuel for light water reactors. Uranium-Molybdenum fuel has the potential to provide superior performance based on its thermo-physical properties. With sufficient development, it may be able to provide the Light Water Reactor industry with a melt-resistant, accident-tolerant fuel with improved safety response. The Pacific Northwest National Laboratory has been tasked with extrusion development and performing ex-reactor corrosion testing to characterize the performance of Uranium-Molybdenum fuel in both these areas. This report documents the results of the fiscal yearmore » 2016 effort to develop the Uranium-Molybdenum metal fuel concept for light water reactors.« less
Project #OA-FY14-0126, January 15, 2014. The EPA OIG is starting fieldwork on the Council of the Inspectors General on Integrity and Efficiency (CIGIE) Cloud Computing Initiative – Status of Cloud-Computing Environments Within the Federal Government.
Designing an effective statewide tobacco control program--Massachusetts.
Connolly, G; Robbins, H
1998-12-15
Smoking-related illnesses kill > 10,000 Massachusetts residents each year and cost hundreds of millions of dollars of public and private expenditures for health care. To combat this public health problem, in 1992 Massachusetts voters approved a referendum question calling for an increased excise tax on tobacco products, with the revenue supporting a Health Protection Fund. Approximately 40% of the fund is used to finance the Massachusetts Tobacco Control Program (MTCP), administered by the Massachusetts Department of Public Health. During the first 3 fiscal years (FY), the MTCP budget has averaged just over $40 million annually, declining during that period from approximately $43 million in FY 1995 to < $37 million in FY 1997.
Shiner, Brian; Leonard Westgate, Christine; Simiola, Vanessa; Thompson, Richard; Schnurr, Paula P; Cook, Joan M
2018-03-14
Available studies on implementation of evidence-based psychotherapy (EBP) for patients attending Department of Veterans Affairs (VA) residential post-traumatic stress disorder (PTSD) programs rely on therapist self-report of EBP delivery. Patient-level data on receipt of EBP are needed both to corroborate therapist self-report and to understand patient factors that predict receipt of EBPs for PTSD. We identified 159 therapists from 38 VA residential PTSD programs who responded to a survey about EBP implementation during the 2015 fiscal year (FY15). Therapists self-reported their use of two EBPs, including prolonged exposure delivered in an individual format (PE-I) and cognitive processing therapy delivered in individual and group formats (CPT-I and CPT-G). Using electronic medical record (EMR) templates mandated for EBP documentation in FY15, we measured contemporaneous patient-level receipt of EBPs for PTSD. We assessed the degree of correlation between therapist self-reported EBP delivery and patient receipt of EBT as measured by EMR templates using polychoric correlation coefficients. We determined patient and therapist factors that predicted the receipt of EBPs with multivariable logistic regression, using random effects and robust standard error estimation, and controlling for site. The Veterans IRB of Northern New England provided a waiver of informed consent; as this was a retrospective review, no patients or therapists were contacted, and all data were stored, transmitted, and analyzed on secure VA servers. The VA Connecticut Health Care System Human Research Protection Program approved secondary use of therapist survey data for this project. When EMR template use became mandated in FY15, the proportion of patients in residential PTSD programs who received at least one EBP session that was recorded with an EMR template increased dramatically from 8.8% to 33.9%. There was adequate correlation and between survey-based and EMR-based measures of EBP receipt, with polychoric correlation values of 0.77 for PE-I, 0.69 for CPT-I, and 0.82 for CPT-G. Multiple patient factors were positive (e.g., female gender) and negative (e.g., depressive disorders) predictors of receipt of EBPs, even after controlling for site. Among therapist factors, only EBP consultant or trainer status was a positive predictor of EBP provision and only therapist race was a negative predictor of EBT provision after controlling for site. Following a FY15 mandate, EMR templates documenting EBP delivery were widely used by therapists working in VA residential PTSD programs. EBP receipt measured using EMR templates was consistent with therapist self-report of EBT delivery. There were several patient-level predictors of EBP receipt and therapist-level predictors of EBP delivery. However, therapists most likely to deliver EBPs were clustered at a limited number of sites.
1981-01-19
a " high -low" mix of high performance ...meet the common threat. 86 Considerable progress is being made. Last year, Japanese ships and aircraft performed very capably in a joint naval exercise... high school graduates, however, does not mean that a high school diploma is necessarily a predictor of on-the-job performance in the military.
State, Foreign Operations, and Related Programs: FY2008 Appropriations
2007-12-14
and social reforms. The President initially pledged $5 billion annually by FY2006, although funds requested and appropriated have never reached this...to Cuba. The BBG is planning to eliminate several VOA services including Uzbek, Greek, and Cantonese as well as the RFE/RL Macedonia service. BBG also...increased to $230.0 million. The increase of $195 million is entirely for social services to Iraqi refugees. FY2007 Supplemental Request. On April 25
Intelligence Spending and Appropriations: Issues for Congress
2013-09-05
while the MIP grew at a slower pace. The NIP budget in 2001 (then referred to as the National Foreign Intelligence Program— NFIP ) was roughly $24 billion...House Appropriations Committee (HAC) disclosure, adjusted for inflation. The Committee indicated that the Administration’s FY1995 NFIP request was...to shows funding for the National Foreign Intelligence Program. The FY1995 figure is therefore a useful proxy for the NFIP budget in FY2001. 13 DNI
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durham, Robin E.; Becker, James M.
This document provides a review and status of activities conducted in support of the Fluor Daniel Hanford Company (Fluor), now Mission Support Alliance (MSA), Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades (2007). Three plantings have been installed on a 4.5-hectare mitigation area to date. This review provides a description and chronology of events, monitoring results, and mitigative actions through fiscal year (FY) 2012. Also provided is a review of the monitoring methods, transect layout, and FY 2012 monitoring activities and results for all planting years. Planting densities and performance criteria stipulated in the MAP were aimed atmore » a desired future condition (DFC) of 10 percent mature sagebrush (Artemisia tridentata ssp wyomingensis) cover. Current recommendations for yielding this DFC are based upon a conceptual model planting of 1000 plants/ha (400/ac) exhibiting a 60-percent survival rate after 5 monitoring years (DOE 2003). Accordingly, a DFC after 5 monitoring years would not be less than 600 plants/ha (240/ac). To date, about 8700 sagebrush plants have been grown and transplanted onto the mitigation site. Harsh site conditions and low seedling survival have resulted in an estimated 489 transplants/ha on the mitigation site, which is 111 plants/ha short of the target DFC. Despite this apparent shortcoming, 71, 91, and 24 percent of the surviving seedlings planted in FY 2007 and FY 2008 and FY 2010, respectively, showed signs of blooming in FY 2012. Blooming status may be a positive indication of future sagebrush recruitment, and is therefore a potential source for reaching the target DFC of 600 plants/ha on this mitigation site over time. Because of the difficulty establishing small transplants on this site, we propose that no additional plantings be considered for this mitigation area and to rely upon the potential recruitment by established seedlings to achieve the mitigation commitment set forth in the MAP of 600 plants/ha.« less
Status of Commercial Programs at NASA
NASA Technical Reports Server (NTRS)
Groen, Frank
2011-01-01
NASA's strategy is two-fold: (1) Use Space Act Agreements to support the development of commercial crew transportation capabilities. (2) Use FAR-based contracts for the certification of commercially developed capabilities and for the procurement of crew transportation services to and from the ISS to meet NASA requirements. Focus is on reducing the risk and uncertainties of the development environment and on the incentives provided through competition by separating the design and early development content from the longer-term CTS Certification activities. CCP expects to develop, demonstrate, and certify U.S. commercial crew space transportation capabilities that meet ISS crew transportation needs by the end of FY 2017.
Revised congressional budget request, FY 1982. Conservation and renewable energy program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-03-01
Programs dealing with conservation and renewable energy are reprinted from the Revised Congressional Budget Request FY 1982. From Volume 7, Energy Conservation, information is presented on: buildings and community systems; industrial programs; transportation programs; state and local programs; inventor's program energy conversion technology; energy impact assistance; and residential/commercial retrofit. From Volume 2, Energy Supply Research and Development, information and data are presented on: solar building applications; solar industrial applications; solar power applications; solar information systems; SERI facility; solar international activities; alcohol fuels; geothermal; and hydropower. From Volume 6, Energy Production, Demonstration, and Distribution, information and data on solar energy production,more » demonstration, and distribution are presented. From Volume 3, Energy Supply and R and D Appropriation, information and data on electric energy systems and energy storage systems are included. From Volume 4, information and data are included on geothermal resources development fund. In Volume 5, Power Marketing Administrations, information and data are presented on estimates by appropriations, positions and staff years by appropriation, staffing distribution, and power marketing administrations. Recissions and deferrals for FY 1981 are given. (MCW)« less
Enabling propulsion materials for high-speed civil transport engines
NASA Technical Reports Server (NTRS)
Stephens, Joseph R.; Herbell, Thomas P.
1992-01-01
NASA Headquarters and LeRC have advocated an Enabling Propulsion Materials Program (EPM) to begin in FY-92. The High Speed Research Phase 1 program which began in FY-90 has focused on the environmental acceptability of a High Speed Civil Transport (HSCT). Studies by industry, including Boeing, McDonnell Douglas, GE Aircraft Engines, and Pratt & Whitney Aircraft, and in-house studies by NASA concluded that NO(x) emissions and airport noise reduction can only be economically achieved by revolutionary advancements in materials technologies. This is especially true of materials for the propulsion system where the combustor is the key to maintaining low emissions, and the exhaust nozzle is the key to reducing airport noise to an acceptable level. Both of these components will rely on high temperature composite materials that can withstand the conditions imposed by commercial aircraft operations. The proposed EPM program will operate in conjunction with the HSR Phase 1 Program and the planned HSR Phase 2 program slated to start in FY-93. Components and subcomponents developed from advanced materials will be evaluated in the HSR Phase 2 Program.
Laboratory Directed Research and Development Program FY2011
DOE Office of Scientific and Technical Information (OSTI.GOV)
none, none
2012-04-27
Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2011 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). Going forward in FY 2012, the LDRD program also supports themore » Goals codified in the new DOE Strategic Plan of May, 2011. The LDRD program also supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the Office of Science Program Offices, such as LDRD projects germane to new research facility concepts and new fundamental science directions. Brief summares of projects and accomplishments for the period for each division are included.« less
NEP systems engineering efforts in FY-92: Plans and status
NASA Technical Reports Server (NTRS)
Doherty, Michael P.; Gilland, James H.
1992-01-01
A system engineering effort has been initiated by NASA in FY-92 to define, address, and resolve issues associated with the use of Nuclear Electric Propulsion (NEP) for megawatt (MW) space propulsion applications associated with the Space Exploration Initiative (SEI). It is intended that key technical issues will be addressed by activities conducted in the early years of a project in NEP, with the objective of resolving such issues. Also, in response to more recent programmatic direction, a concept definition activity for 100 kilowatt NEP is being initiated. This paper will present key issues associated with megawatt NEP, and the plans and status for their resolution, and present the scope and rationale for the 100 kilowatt concept definition activity.
Annual Plan for the EPA and CSB - FY 2018
Nov 9, 2017. FY 2018 plan reflects the priority work that the OIG believes is necessary to keep the EPA Administrator, the CSB, and Congress fully informed about problems and deficiencies relating to the administration of agency programs and operations.
77 FR 26751 - Integrated Risk Information System (IRIS); Announcement of 2012 Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-07
...-41-4. ethylene oxide (cancer) 75-21-8. formaldehyde \\1\\ 50-00-0. hexabromocyclododecane (mixed 3194...\\. octamethylcyclotetrasiloxane 556-67-2 FY13. (D4) \\2\\. 1,2-dichloroethane (ethylene 107-06-2 FY14. dichloride) \\1,3...
TRAC-Monterey FY16 Work Program Development and Report of Research Elicitation
2016-01-01
any changes to priorities or additional projects that require immediate research. Work Program; Research Elicitation Unclassified UU UU UU UU 35 MAJ...conduct analysis for the Army. 1 Marks, Chris, Nesbitt, Peter. TRAC FY14 Research Requirements Elicitation . Technical Report TRAC-M-TM-13-059. 700 Dyer... Requirements Elicitation Interviews Interview Guide: 1. Describe a research requirement in the areas of topics, techniques, and methodologies. 2
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-01
... rule maintains the new stock status determination criteria for pollock and associated increases in..., address, etc.) voluntarily submitted by the commenter may be publicly accessible. Do not submit... the revised pollock stock status determination and catch limits for FY 2010, as follows: The revised...
78 FR 44982 - National Science Board; Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-25
... regard to the scheduling of a teleconference meeting of the Committee on Strategy and Budget. AGENCY... MATTER: Discussion of NSF FY 2015 budget development. STATUS: Closed. PLACE: This meeting will be held by... additional information. Meeting information and schedule updates (time, place, subject matter or status of...
Project #OA-FY16-0179, September 20, 2016. The EPA OIG is canceling its audit on status of corrective actions to address operational deficiencies at the EPA’s National Center for Radiation Field Operations.
ERIC Educational Resources Information Center
Southwest Educational Development Lab., Austin, TX. Southwest Consortium for the Improvement of Mathematics and Science Teaching.
This report presents activities, accomplishments, and conclusions of the Eisenhower Southwest Consortium for the Improvement of Mathematics and Science Teaching (SCIMAST) for the fiscal years 1996-2000. SCIMAST was established in 1992 and supports mathematics and science learning in the states of Arkansas, Louisiana, New Mexico, Oklahoma, and…
ERIC Educational Resources Information Center
Pennsylvania State Commission for Community Colleges, Harrisburg.
Compiled to assist Pennsylvania community colleges in analyzing their financial performance in relation to their peers, this report contains financial and historical data for the 14 colleges in the state for fiscal year (FY) 1993-94 and projections for years 1994-95 and 1995-96. Section I provides tables detailing reimbursement requests for…
1992-01-01
counications between technology producer (Navy RDT&X community) and technology customer (Navy/MarLne Corps operating forces). Program technological...Additional programs as rwured by Fleet customer . 3. (U) 1t 1993 Planes Identify issues and provide link to RDT&3 community. Projects will vary according to...fleet customer requLrements. 4. (U) Program to Cmpletions This is a continuing program. D. (U) WORK pIRFORIpD l: iN-DOSE: NsWC Dahlgren, VA; AC
77 FR 20437 - Susan Harwood Training Grant Program, FY 2012
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-04
... DEPARTMENT OF LABOR Occupational Safety and Health Administration Susan Harwood Training Grant... availability of funds and solicitation for Grant Applications (SGA) for Targeted Topic Training, and Targeted Topic Training and Educational Materials Development Grants. Funding Opportunity No.: SHTG-FY-12-01...
FY 2016 and FY 2017 Request for Proposals for the Source Reduction Assistance Grant Program
EPA is announcing the availability of SRA grants and/or cooperative agreements to fund projects supporting p2/source reduction and resource conservation; it is anticipated up to $2,200,000 will be available collectively.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kim, Jong Suk; Bragg-Sitton, Shannon M.; Boardman, Richard D.
This report has been prepared as part of an effort to design and build a modeling and simulation (M&S) framework to assess the economic viability of a nuclear-renewable hybrid energy system (N-R HES). In order to facilitate dynamic M&S of such an integrated system, research groups in multiple national laboratories have been developing various subsystems as dynamic physics-based components using the Modelica programming language. In fiscal year 2015 (FY15), Idaho National Laboratory (INL) performed a dynamic analysis of two region-specific N-R HES configurations, including the gas-to-liquid (natural gas to Fischer-Tropsch synthetic fuel) and brackish water reverse osmosis desalination plants asmore » industrial processes. In FY16, INL developed two additional subsystems in the Modelica framework: (1) a high-temperature steam electrolysis (HTSE) plant as a high priority industrial plant to be integrated with a light water reactor (LWR) within an N-R HES and (2) a gas turbine power plant as a secondary energy supply. In FY17, five new components (i.e., a feedwater pump, a multi-stage compression system, a sweep-gas turbine, flow control valves, and pressure control valves) have been incorporated into the HTSE system proposed in FY16, aiming to better realistically characterize all key components of concern. Special attention has been given to the controller settings based on process models (i.e., direct synthesis method), aiming to improve process dynamics and controllability. A dynamic performance analysis of the improved LWR/HTSE integration case was carried out to evaluate the technical feasibility (load-following capability) and safety of such a system operating under highly variable conditions requiring flexible output. The analysis (evaluated in terms of the step response) clearly shows that the FY17 model resulted in superior output responses with much smaller settling times and less oscillatory behavior in response to disturbances in the electric load than those observed with the FY16 model. Simulation results involving several case studies show that the suggested control scheme could maintain the controlled variables (including the steam utilization factor, cathode stream inlet composition, and temperatures and pressures of the process streams at various locations) within desired limits under various plant operating conditions. The results also indicate that the proposed HTSE plant could provide operational flexibility to participate in energy management at the utility scale by dynamically optimizing the use of excess plant capacity within an N-R HES.« less
1992-01-01
3 are severely deteriorated. The concrete deck and supporting wood -pile structure are nearing the end of their life cycle. Both piers are to be...PROPOSED CONSTRUCTION One-story building with concrete foundation walls, load bearing masonry walls, and concrete floors; roof with wood truss framing...concrete building addition; concrete foundation and slab on grade; wood truss roof; 750 KVA. 3 phase transformer; utilities; concrete and storm drain. 11
The Marshall Space Flight Center KC-135 zero gravity test program for FY 1982
NASA Technical Reports Server (NTRS)
Shurney, R. E. (Editor)
1983-01-01
During FY-82, researchers and experimenters from Marshall Space Flight Center (MSFC) conducted 11 separate investigations during 26.3 hr of testing aboard the KC-135 zero-gravity aircraft, based at Ellington Air force Base, Texas. Although this represented fewer hours than initially projected, all experiment and test objectives were met or exceeded. This Technical Memorandum compiles all results achieved by MSFC users during FY-82, a year considered to be highly productive.
1999-02-01
299 28 271 0 194 16 178 0 TOTAL OFFICER ENLISTED 948 120 828 954 89 865 12. RESERVE UNIT DATA UNIT DESIGNATION 156 Aircraft Generation...with oil/water separator, fire suppression (overhead wet pipe and underwing AFFF ), personnel breathing apparatus, fall protection system, and all...underwing AFFF ), and floor refmishing/restriping. The hangar shops and offices require relocation/renovation. Various utility systems need to be
DOE Office of Scientific and Technical Information (OSTI.GOV)
Diaz, Aaron A.; Larche, Michael R.; Mathews, Royce
2015-09-01
This Technical Letter Report (TLR) describes work conducted at the Pacific Northwest National Laboratory (PNNL) during FY 2015 on the under-sodium viewing (USV) PNNL project 58745, Work Package AT-15PN230102. This TLR satisfies PNNL’s M3AT-15PN2301027 milestone, and is focused on summarizing the design, development, and evaluation of a two-dimensional matrix phased-array probe referred to as serial number 3 (SN3). In addition, this TLR also provides the results from a performance demonstration of in-sodium target detection trials at 260°C using a one-dimensional 22-element linear array developed in FY14 and referred to as serial number 2 (SN2).
2016 Los Alamos National Laboratory Hazardous Waste Minimization Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Salzman, Sonja L.; English, Charles Joe
Waste minimization and pollution prevention are goals within the operating procedures of Los Alamos National Security, LLC (LANS). The US Department of Energy (DOE), inclusive of the National Nuclear Security Administration (NNSA) and the Office of Environmental Management, and LANS are required to submit an annual hazardous waste minimization report to the New Mexico Environment Department (NMED) in accordance with the Los Alamos National Laboratory (LANL or the Laboratory) Hazardous Waste Facility Permit. The report was prepared pursuant to the requirements of Section 2.9 of the LANL Hazardous Waste Facility Permit. This report describes the hazardous waste minimization program, whichmore » is a component of the overall Pollution Prevention (P2) Program, administered by the Environmental Stewardship Group (EPC-ES). This report also supports the waste minimization and P2 goals of the Associate Directorate of Environmental Management (ADEM) organizations that are responsible for implementing remediation activities and describes its programs to incorporate waste reduction practices into remediation activities and procedures. This report includes data for all waste shipped offsite from LANL during fiscal year (FY) 2016 (October 1, 2015 – September 30, 2016). LANS was active during FY2016 in waste minimization and P2 efforts. Multiple projects were funded that specifically related to reduction of hazardous waste. In FY2016, there was no hazardous, mixed-transuranic (MTRU), or mixed low-level (MLLW) remediation waste shipped offsite from the Laboratory. More non-remediation hazardous waste and MLLW was shipped offsite from the Laboratory in FY2016 compared to FY2015. Non-remediation MTRU waste was not shipped offsite during FY2016. These accomplishments and analysis of the waste streams are discussed in much more detail within this report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conger, Robin L.; Spanner, Gary E.
2011-11-02
The businesses that have utilized PNNL's Technology Assistance Program were sent a survey to solicit feedback about the program and to determine what, if any, outcomes resulted from the assistance provided. As part of its small business outreach, Pacific Northwest National Laboratory (PNNL) offers technology assistance to businesses with fewer than 500 employees throughout the nation and to businesses of any size in the 2 counties that contain the Hanford site. Upon request, up to 40 staff-hours of a researcher's time can be provided to address technology issues at no charge to the requesting firm. During FY 2011, PNNL completedmore » assistance for 54 firms. Topics of the technology assistance covered a broad range, including environment, energy, industrial processes, medical, materials, computers and software, and sensors. In FY 2011, PNNL's Technology Assistance Program (TAP) was funded by PNNL Overheads. Over the past 16 years, the Technology Assistance Program has received total funding of nearly $2.8 million from several federal and private sources.« less
NEPP DDR Device Reliability FY13 Report
NASA Technical Reports Server (NTRS)
Guertin, Steven M.; Armbar, Mehran
2014-01-01
This document reports the status of the NEPP Double Data Rate (DDR) Device Reliability effort for FY2013. The task targeted general reliability of > 100 DDR2 devices from Hynix, Samsung, and Micron. Detailed characterization of some devices when stressed by several data storage patterns was studied, targeting ability of the data cells to store the different data patterns without refresh, highlighting the weakest bits. DDR2, Reliability, Data Retention, Temperature Stress, Test System Evaluation, General Reliability, IDD measurements, electronic parts, parts testing, microcircuits
1994-06-03
wft*:¥A:ft:i:ft& OFFICE OF THE INSPECTOR GENERAL AV-8B REMANUFACTURE PROGRAM AS PART OF THE AUDIT OF THE DEFENSE ACQUISITION BOARD...Part of the Audit of the Defense Acquisition Board Review Process - FY 1994 B. DATE Report Downloaded From the Internet: 03/23/99 C. Report’s Point...NAVY FOR RESEARCH DEVELOPMENT AND ACQUISITION SUBJECT: Audit Report on the AV-8B Remanufacture Program as Part of the Audit of the Defense
DOE Office of Scientific and Technical Information (OSTI.GOV)
Griffith, Daniel Todd
2015-04-01
This final report is a compilation of resear ch efforts - funded by the US Department of Energy Wind and Water Power Technolog ies Office over a four-year period from FY11 through FY14. The goals of this re search program were to develop and evaluate technical innovati ons with promise for maxi mizing revenues and reducing levelized cost of energy (LCOE) for offs hore wind plants - more specifically the goals of the Structural H ealth and Prognostics Management (SHPM) program were to reduce O&M costs and increase energy capture through use of SHPM-based technologies. A technology roadmap was devemore » loped at the start of the project to guide the research efforts. This roadmap identified and outlined six major research thrust areas each having five stages of ma turity. Research was conducted in each of these thrust areas, as documented throughout this report, although a major focus was on development of damage detection strategi es for the most frequent blade damage conditions and damage mitigation and life-exte nsion strategies via changes in turbine operations (smart loads management). Th e work summarized in this compilation report is the product of the work of many researchers. A summary of the major findings, status of the SHPM Technology Ro admap and recommendations for future work are also provided.« less
The Merida Initiative: Refuting the Need for a Military Hammer
2012-03-08
resulted in a package of U.S. assistance for Mexico and Central America beginning in FY 2008 and lasting through FY 2010. Dubbed the Merida Initiative...at- risk youth program (non-Merida) administered by international organizations working in the city [Ciudad Jaurez].”59 These two initiatives in...officers in the Department of Defense IMET funded programs of any Latin American country.”69 Department of Defense provides other opportunities in
DOE Office of Scientific and Technical Information (OSTI.GOV)
Texeira, R.H.; Goodman, B.J.
This report summarizes the research progress and accomplishments of the US Department of Energy (DOE) Ethanol from Biomass Program, field managed by the Solar Energy Research Institute, during FY 1990. The report includes an overview of the entire program and summaries of individual research projects. These projects are grouped into the following subject areas: technoeconomic analysis; pretreatment; cellulose conversion; xylose fermentation; and lignin conversion. Individual papers have been indexed separately for inclusion on the data base.
FY14 LLNL OMEGA Experimental Programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heeter, R. F.; Fournier, K. B.; Baker, K.
In FY14, LLNL’s High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall these LLNL programs led 324 target shots in FY14, with 246 shots using just the OMEGA laser system, 62 shots using just the EP laser system, and 16 Joint shots using Omega and EP together. Approximately 31% of the total number of shots (62 OMEGA shots, 42 EP shots) shots supported the Indirect Drive Inertial Confinement Fusion Campaign (ICF-ID).more » The remaining 69% (200 OMEGA shots and 36 EP shots, including the 16 Joint shots) were dedicated to experiments for High- Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports.« less
FY15 LLNL OMEGA Experimental Programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heeter, R. F.; Baker, K. L.; Barrios, M. A.
In FY15, LLNL’s High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall these LLNL programs led 468 target shots in FY15, with 315 shots using just the OMEGA laser system, 145 shots using just the EP laser system, and 8 Joint shots using Omega and EP together. Approximately 25% of the total number of shots (56 OMEGA shots and 67 EP shots, including the 8 Joint shots) supported the Indirect Drivemore » Inertial Confinement Fusion Campaign (ICF-ID). The remaining 75% (267 OMEGA shots and 86 EP shots) were dedicated to experiments for High-Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports.« less
NASA Astrophysics Data System (ADS)
Min, Min; Wu, Chunqiang; Li, Chuan; Liu, Hui; Xu, Na; Wu, Xiao; Chen, Lin; Wang, Fu; Sun, Fenglin; Qin, Danyu; Wang, Xi; Li, Bo; Zheng, Zhaojun; Cao, Guangzhen; Dong, Lixin
2017-08-01
Fengyun-4A (FY-4A), the first of the Chinese next-generation geostationary meteorological satellites, launched in 2016, offers several advances over the FY-2: more spectral bands, faster imaging, and infrared hyperspectral measurements. To support the major objective of developing the prototypes of FY-4 science algorithms, two science product algorithm testbeds for imagers and sounders have been developed by the scientists in the FY-4 Algorithm Working Group (AWG). Both testbeds, written in FORTRAN and C programming languages for Linux or UNIX systems, have been tested successfully by using Intel/g compilers. Some important FY-4 science products, including cloud mask, cloud properties, and temperature profiles, have been retrieved successfully through using a proxy imager, Himawari-8/Advanced Himawari Imager (AHI), and sounder data, obtained from the Atmospheric InfraRed Sounder, thus demonstrating their robustness. In addition, in early 2016, the FY-4 AWG was developed based on the imager testbed—a near real-time processing system for Himawari-8/AHI data for use by Chinese weather forecasters. Consequently, robust and flexible science product algorithm testbeds have provided essential and productive tools for popularizing FY-4 data and developing substantial improvements in FY-4 products.
Alternative Electrochemical Salt Waste Forms, Summary of FY11-FY12 Results
DOE Office of Scientific and Technical Information (OSTI.GOV)
Riley, Brian J.; Mccloy, John S.; Crum, Jarrod V.
2014-01-17
The Fuel Cycle Research and Development Program, sponsored by the U.S. Department of Energy Office of Nuclear Energy, is currently investigating alternative waste forms for wastes generated from nuclear fuel processing. One such waste results from an electrochemical separations process, called the “Echem” process. The Echem process utilizes a molten KCl-LiCl salt to dissolve the fuel. This process results in a spent salt containing alkali, alkaline earth, lanthanide halides and small quantities of actinide halides, where the primary halide is chloride with a minor iodide fraction. Pacific Northwest National Laboratory (PNNL) is concurrently investigating two candidate waste forms for themore » Echem spent-salt: high-halide minerals (i.e., sodalite and cancrinite) and tellurite (TeO2)-based glasses. Both of these candidates showed promise in fiscal year (FY) 2009 and FY2010 with a simplified nonradioactive simulant of the Echem waste. Further testing was performed on these waste forms in FY2011 and FY2012 to assess the possibility of their use in a sustainable fuel cycle. This report summarizes the combined results from FY2011 and FY2012 efforts.« less
Evaluation of FY 1987 safety belt use law state enforcement grants
DOT National Transportation Integrated Search
1991-03-01
The report presents information and an evaluation of safety belt use law enforcement grants provided to 17 states through supplemental 403 grants during FY 1987. Elmira-type programs were to serve as a model in order to demonstrate that basic enforce...
Site Characterization and Monitoring Technical Support Center FY16 Report
SCMTSC’s primary goal is to provide technical assistance to regional programs on complex hazardous waste site characterization issues. This annual report illustrates the range and extent of projects that SCMTSC supported in FY 2016. Our principal audiences are site project manage...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-15
... (RC-2434)--FY14 Re-Brief, Dr. Jeffrey Foster, Northern Seed Dispersal Networks and Novel Arizona.... Sediments, and Biological Receptors. 1:25 p.m 14 ER03-025 (ER-2428)--FY14 New Start, Dr. Danny Reible, Texas...
FY 2018 and FY 2019 Pollution Prevention Grant Program Request for Proposals
To assist state and tribal governments to encourage businesses to adopt environmental strategies and solutions that significantly reduce or eliminate waste from the source, EPA anticipates it will award approximately $4.69 million for the P2 Grant in 2018.
Transportation Research and Analysis Computing Center (TRACC) Year 6 Quarter 4 Progress Report
DOT National Transportation Integrated Search
2013-03-01
Argonne National Laboratory initiated a FY2006-FY2009 multi-year program with the US Department of Transportation (USDOT) on October 1, 2006, to establish the Transportation Research and Analysis Computing Center (TRACC). As part of the TRACC project...
FY 2016 and FY 2017 Pollution Prevention Grant Program Request for Proposals
To assist state and tribal governments to encourage businesses to adopt environmental strategies and solutions that significantly reduce or eliminate waste from the source, EPA anticipates it will award approximately $3.97 million for the P2 Grant in 2016.
ERIC Educational Resources Information Center
Driskell, Judy A.; Myers, John R.
1989-01-01
Cooperative State Research Service-administered and state-appropriated State Agriculture Experiment Station funds for human nutrition research increased about two-fold from FY70-FY86, while the percentage of budget expended for this research decreased. (JOW)
The US DOE-EM International Program - 13004
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elmetti, Rosa R.; Han, Ana M.; Williams, Alice C.
2013-07-01
The U.S. Department of Energy (DOE) Office of Environmental Management (EM) conducts international collaboration activities in support of U.S. policies and objectives regarding the accelerated risk reduction and remediation of environmental legacy of the nations' nuclear weapons program and government sponsored nuclear energy research. The EM International Program supported out of the EM Office of the Associate Principal Deputy Assistant Secretary pursues collaborations with foreign government organizations, educational institutions and private industry to assist in identifying technologies and promote international collaborations that leverage resources and link international experience and expertise. In fiscal year (FY) 2012, the International Program awarded eightmore » international collaborative projects for work scope spanning waste processing, groundwater and soil remediation, deactivation and decommissioning (D and D) and nuclear materials disposition initiatives to seven foreign organizations. Additionally, the International Program's scope and collaboration opportunities were expanded to include technical as well as non-technical areas. This paper will present an overview of the on-going tasks awarded in FY 2012 and an update of upcoming international activities and opportunities for expansion into FY 2013 and beyond. (authors)« less
The US DOE EM international program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elmetti, Rosa R.; Han, Ana M.; Roach, Jay A.
2013-07-01
The U.S. Department of Energy (DOE) Office of Environmental Management (EM) conducts international collaboration activities in support of U.S. policies and objectives regarding the accelerated risk reduction and remediation of environmental legacy of the nations' nuclear weapons program and government sponsored nuclear energy research. The EM International Program supported out of the EM Office of the Associate Principal Deputy Assistant Secretary pursues collaborations with foreign government organizations, educational institutions and private industry to assist in identifying technologies and promote international collaborations that leverage resources and link international experience and expertise. In fiscal year (FY) 2012, the International Program awarded eightmore » international collaborative projects for work scope spanning waste processing, groundwater and soil remediation, deactivation and decommissioning (D and D) and nuclear materials disposition initiatives to seven foreign organizations. Additionally, the International Program's scope and collaboration opportunities were expanded to include technical as well as non-technical areas. This paper will present an overview of the on-going tasks awarded in FY 2012 and an update of upcoming international activities and opportunities for expansion into the remainder of FY 2013 and beyond. (authors)« less
Congress examines administration's coal research priorities
NASA Astrophysics Data System (ADS)
Showstack, Randy
2011-10-01
While the Obama administration has proposed a shift in coal research funding to further emphasize carbon capture and sequestration (CCS) programs in its fiscal year (FY) 2012 budget request, Republicans and several witnesses at a 13 October hearing of a subcommittee of the House of Representatives' Committee on Science, Space, and Technology questioned those priorities, called for additional federal funding for coal research, and defended the use of coal as a major part of the U.S. energy sector. The administration's FY 2012 budget requests 291.4 million to fund the Department of Energy's (DOE) CCS and power systems program while zeroing out funding for DOE's fuels and power systems program (which includes funding for coal research) and shifting some of its line items to the CCS program. The FY 2011 continuing resolution has funded the fuels and power systems program at 400.2 million, including 142 million for carbon sequestration, 64.8 million for innovations for existing plants, and funding for other subprograms such as advanced integrated gasification combined cycle (52.9 million), fuel cells (49.8 million), and advanced research ($47.6 million).
Integrated modeling of advanced optical systems
NASA Astrophysics Data System (ADS)
Briggs, Hugh C.; Needels, Laura; Levine, B. Martin
1993-02-01
This poster session paper describes an integrated modeling and analysis capability being developed at JPL under funding provided by the JPL Director's Discretionary Fund and the JPL Control/Structure Interaction Program (CSI). The posters briefly summarize the program capabilities and illustrate them with an example problem. The computer programs developed under this effort will provide an unprecedented capability for integrated modeling and design of high performance optical spacecraft. The engineering disciplines supported include structural dynamics, controls, optics and thermodynamics. Such tools are needed in order to evaluate the end-to-end system performance of spacecraft such as OSI, POINTS, and SMMM. This paper illustrates the proof-of-concept tools that have been developed to establish the technology requirements and demonstrate the new features of integrated modeling and design. The current program also includes implementation of a prototype tool based upon the CAESY environment being developed under the NASA Guidance and Control Research and Technology Computational Controls Program. This prototype will be available late in FY-92. The development plan proposes a major software production effort to fabricate, deliver, support and maintain a national-class tool from FY-93 through FY-95.
Biological and Chemical Technologies Research at OIT: Annual Summary Report, FY 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peterson, G.
1998-03-01
The annual summary report presents the fiscal year (FY) 1 997 research activities and accomplishments for the United States Department of Energy (DOE) Biological and Chemical Technologies Research (BCTR) Program. This BCTR program resides within the Office of Industrial Technologies (OIT) of the Office of Energy Efficiency and Renewable Energy (EE). The annual summary report for 1997 (ASR 97) contains the following: program description (including BCTR program mission statement, historical background, relevance, goals and objectives); program structure and organization; selected technical and programmatic highlights for 1 997; detailed descriptions of individual projects; and a listing of program output, including amore » bibliography of published work, patents, and awards arising from work supported by the program.« less
Runaway and Homeless Youth: FY 1984 Annual Report to the Congress.
ERIC Educational Resources Information Center
Administration for Children, Youth, and Families (DHHS), Washington, DC.
This report describes the activities of the Administration for Children, Youth and Families in the Department of Health and Human Services, and the status and accomplishments of runaway and homeless youth centers funded during fiscal year 1984 under the Runaway and Homeless Youth Act. The report also examines the status, operations, and…
Workload Trend Analysis for the Military Graduate Medical Education Program in San Antonio
2005-05-25
Procedures 57 Introduction and Methodology 57 Results and Discussion 58 Craniotomy 61 Introduction and Methodology 61 Results and Discussion 62...distribution of major vascular procedures by age group for FY 00-04 36. WHMC and BAMC craniotomies for FY 00-04 by age group 37. WHMC and BAMC FY 00-04...average craniotomies by age group compared to required average based on RRC requirement 38. WHMC and BAMC distribution of craniotomies by age group for
Coalition Warfare Program Presentation to: 2009 EUCOM/AFRICOM Science and Technology Conference
2009-06-01
compac an nexpens ve m cro- fluxgate magnetometer for use in multiple COCOMs. To continue T&E with joint services and apply lessons learned to...Partners in EUCOM/AFRICOM FY08 Starts • Advanced Dynamic Magnetometer FY09 Starts • ADNS Coalition Network FY10 New Starts • Clip-on Night Vision...Partner 2008 New Starts Advanced Dynamic Magnetometer for Static and Moving Applications T d l t d i i i US Navy (SPAWAR) Italy, Sweden o eve op a a
Boundary Control Systems, Assessment Remedial Investigation, Version 2. 1. Volume 1
1988-12-01
ALLUVIAL WELLS CALCULATED TRANSMISSIVITY VALUES. AND ALLUVIAL WELLS MONITORED. . FOR WATER LEVELS FY87 A.? WELL SITING RATIONALE 10 A-3 WELL COMPLETION...29 Contour Map of Transmissivity of the Alluvial Aquifer 3rd Quarter FY 1987 B-30 Potentiometric Surface, Denver Formation Sand Zone 4 3rd Quarter FY...Monitoring 2-10 2.2-2 Chemical Analysis - Task 25 Anal-tical Program ;-14 4.1-1 Transmissivity (T), Hydraulic Conductivity (K), and 4-12 Apparent Specific
U.S. Marine Corps FY 82 Exploratory Development Program.
1982-01-25
1. It is requested that the cover of the reference be pen changed to reflect "FY 82" vice "FY 81". DISTRIBUTION: By direction (see attached pages) i4...Falls Church, VA 22041 3 Marine Corps Liaison Officer Naval Weapons Center China Lake, CA 93555 Marine Corps Liaison Officer HQ MASSTER Ft. Hood, TX...Center, Hawaii Lab P. 0. Box 997 Kaihua, Hawaii 96734 Mr. Paul H. Amundson Code 3304 Naval Weapons Center China Lake, CA 93555 Naval Surface Weapons
Geophysics Funding Healthy in FY 1986 Federal Budget
NASA Astrophysics Data System (ADS)
Richman, Barbara T.; Robb, David W.
Continued support for many geophysics projects is part of the fiscal year (FY) 1986 budget proposal that President Ronald Reagan sent to Congress earlier this month. Unlike many other programs that took deep cuts or were eliminated, overall funding for science held steady in the proposed budget. This budget proposal, however, did not offer the large increases that had been proposed for FY 1985 (Eos, February 14, 1984, p. 49). Figure 1 shows the trend for science outlays during the past several years.
1989-01-01
size, weight , power consumption, and radiation hardness, and on software algorithm validity and efficiency. 3. (U) Collection of radar, ctical, and...which have potential to achieve cooling requirements for LWIR sensors with far smaller weight and power penalties. (U) FY1989 Planned Program: o (U...two dollars for every SDI dollar. o (U) Inverted gaili--n arsenide by growing a razor-thin layer of silicon on GaAs and thus cut power loss by two
Guide to the NITRD Program FY 2004-FY 2005. Supplement to the President’s Budget for FY 2005
2004-12-01
electronic medical records systems . At the core of such systems is the concept of a secure, patient-centered electronic health record ( EHR ) that: 1...support the development of an NHII that includes an Electronic Health Record System ( EHRS ). The EHRS will be a longitudinal collection of electronic... health information for and about persons. It will allow electronic access to person- and population-level information by authorized users. The system
Research Laboratory for Engineering and Tehnology (ReLEnT)-Summer Program
NASA Technical Reports Server (NTRS)
Okhio, Cyril B.
1996-01-01
During the fiscal years 1994-1995 students at Central State University (CSU) have worked diligently under the supervision of the PI and associates to plan, design and conduct a four-week hands on summer program for high school students in grades 9 to 12. These workshops consists of experiments and computer aided design and manufacturing, designed to constructively stimulate interests in engineering and technology, and promote enrollment at CSU after they matriculate from high school. The experience gained in two years will be utilized to realize one of the deliverables for CSU engineering program during 1996. In FY-96 a new total of 30 students are now being interviewed for the 1996 program. This grant also provides resource for students enrolled in CSU's engineering program to work as undergraduate research assistants and ReLEnT tuition scholarship awards. These students are involved in the development of research, design projects, workshop procedures, laboratory exercises and seminars. Undergraduate students receiving tuition scholarships are required to maintain a cumulative grade point average of 3.0 or higher. Finally, the ReLEnT award has made it possible for CSU to acquire some experimental and CFD capability which now provides us with the opportunity to compete and respond to RFP's on a competitive basis and a timely manner.
NASA Technical Reports Server (NTRS)
Sakahara, Robert; Hackenberg, Davis; Johnson, William
2017-01-01
This presentation was presented to the Integrated Aviation Systems Program at the FY17 Annual Review of the UAS-NAS project. The presentation captures the overview of the work completed by the UAS-NAS project and its subprojects.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-01
...,716 Hawaii Gay & Robinson, Inc 72,401 -18,673 -50,592 3,136 Hawaiian Commercial & Sugar Company... & Sons 495,489 Total Louisiana 1,620,472 Texas: Rio Grande Valley 182,094 Hawaii: Gay & Robinson, Inc 73...
State, Foreign Operations, and Related Programs: FY2009 Appropriations
2009-04-03
resources in a few low- and low- middle income countries that have demonstrated a strong commitment to political, economic, and social reforms. The...several other areas.11 In FY2008, BBG proposed to reduce or eliminate radio broadcasting in a number of services, including Cantonese , Ukrainian
Research administration, state planning & research part II program : FY2012 at-a-glance.
DOT National Transportation Integrated Search
2012-01-01
This publication presents a summary of Research and Library funding statistics and project progress for Fiscal Year (FY) 2012. The tables on pages 2 through 7 list all MDOT-funded research projects by focus area that were active or completed during 2...
Research administration, state planning & research part II program : FY2013 at-a-glance.
DOT National Transportation Integrated Search
2014-01-01
This publication presents a summary of Research and Library funding statistics and project progress for Fiscal Year : (FY) 2013. The tables on pages 2 through 7 list all MDOT-funded research projects by topic area that were active : or completed duri...
75 FR 11841 - Repowering Assistance Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-12
... application window. SUMMARY: RBS is announcing a new application window to submit applications for the...-time application window for remaining FY 2009 funds. Paperwork Reduction Act In accordance with the... allocate all of the FY 2009 authorized funds. Therefore, the Agency is opening a new application window to...
DOT National Transportation Integrated Search
2012-09-30
In FY 2008, Federal and State enforcement personnel conducted 14,906 compliance reviews (CRs) on individual motor carriers. It is intended that through education, heightened safety regulation awareness, and the enforcement effects of the CR, carriers...
Gitterman, Daniel P; Langford, W Scott; Hay, William W
2018-03-01
In this article, we examine the status of the National Institutes of Health (NIH) pediatric research portfolio between start of federal fiscal year (FY) 1992 and end of FY 2015. The NIH experienced the greatest mean annual growth rate during the "doubling era" (FY 1998-2003): both the NIH budget (13.5%) and pediatric research portfolios (11.5%) increased annually by double digits. However, in the "postdoubling" era (FY 2004-2009), both the NIH (2.0%) and pediatric (-0.2%) mean annual growth rates decreased dramatically. In the most recent era (FY 2010-2015), the NIH mean annual growth rate has been flat (-0.1%) and pediatric research funding has posted very modest gains (3.5%) without accounting for 1-time increases under the 2009 American Recovery and Reinvestment Act. We offer recommendations to protect against further erosion of the pediatric research portfolio because continuation of these trends will have a negative effect on the health of children during their childhood and as adults. As capacity to conduct basic and applied research is further constrained, it will be a challenge for pediatric researchers to do more with less and less.
2017-03-01
the start of the bust phase following the Carter-Reagan boom. From peak procurement Budget Authority of $183.9 billion (FY 2017 dollars) in FY 1985...to close a funding gap involves choices among bad alternatives—cancellations, delays in new starts , stretches of existing programs, acceptance of...less capable alternatives in some cases, and adoption of very optimistic costing and programmatic decisions for both new starts and—to the extent
Technology Catalogue. First edition
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
The Department of Energy`s Office of Environmental Restoration and Waste Management (EM) is responsible for remediating its contaminated sites and managing its waste inventory in a safe and efficient manner. EM`s Office of Technology Development (OTD) supports applied research and demonstration efforts to develop and transfer innovative, cost-effective technologies to its site clean-up and waste management programs within EM`s Office of Environmental Restoration and Office of Waste Management. The purpose of the Technology Catalogue is to provide performance data on OTD-developed technologies to scientists and engineers assessing and recommending technical solutions within the Department`s clean-up and waste management programs, asmore » well as to industry, other federal and state agencies, and the academic community. OTD`s applied research and demonstration activities are conducted in programs referred to as Integrated Demonstrations (IDs) and Integrated Programs (IPs). The IDs test and evaluate.systems, consisting of coupled technologies, at specific sites to address generic problems, such as the sensing, treatment, and disposal of buried waste containers. The IPs support applied research activities in specific applications areas, such as in situ remediation, efficient separations processes, and site characterization. The Technology Catalogue is a means for communicating the status. of the development of these innovative technologies. The FY93 Technology Catalogue features technologies successfully demonstrated in the field through IDs and sufficiently mature to be used in the near-term. Technologies from the following IDs are featured in the FY93 Technology Catalogue: Buried Waste ID (Idaho National Engineering Laboratory, Idaho); Mixed Waste Landfill ID (Sandia National Laboratories, New Mexico); Underground Storage Tank ID (Hanford, Washington); Volatile organic compound (VOC) Arid ID (Richland, Washington); and VOC Non-Arid ID (Savannah River Site, South Carolina).« less
Public Health Preparedness Funding: Key Programs and Trends From 2001 to 2017.
Watson, Crystal R; Watson, Matthew; Sell, Tara Kirk
2017-09-01
To evaluate trends in funding over the past 16 years for key federal public health preparedness and response programs at the US Department of Health and Human Services, to improve understanding of federal funding history in this area, and to provide context for future resource allocation decisions for public health preparedness. In this 2017 analysis, we examined the funding history of key federal programs critical to public health preparedness by reviewing program budget data collected for our annual examination of federal funding for biodefense and health security programs since fiscal year (FY) 2001. State and local preparedness at the Centers for Disease Control and Prevention initially received $940 million in FY2002 and resulted in significant preparedness gains, but funding levels have since decreased by 31%. Similarly, the Hospital Preparedness Program within the Office of the Assistant Secretary for Preparedness and Response was funded at a high of $515 million in FY2003, but funding was reduced by 50%. Investments in medical countermeasure development and stockpiling remained relatively stable. The United States has made significant progress in preparing for disasters and advancing public health infrastructure. To enable continued advancement, federal funding commitments must be sustained.
Public Health Preparedness Funding: Key Programs and Trends From 2001 to 2017
Sell, Tara Kirk
2017-01-01
Objectives. To evaluate trends in funding over the past 16 years for key federal public health preparedness and response programs at the US Department of Health and Human Services, to improve understanding of federal funding history in this area, and to provide context for future resource allocation decisions for public health preparedness. Methods. In this 2017 analysis, we examined the funding history of key federal programs critical to public health preparedness by reviewing program budget data collected for our annual examination of federal funding for biodefense and health security programs since fiscal year (FY) 2001. Results. State and local preparedness at the Centers for Disease Control and Prevention initially received $940 million in FY2002 and resulted in significant preparedness gains, but funding levels have since decreased by 31%. Similarly, the Hospital Preparedness Program within the Office of the Assistant Secretary for Preparedness and Response was funded at a high of $515 million in FY2003, but funding was reduced by 50%. Investments in medical countermeasure development and stockpiling remained relatively stable. Conclusions. The United States has made significant progress in preparing for disasters and advancing public health infrastructure. To enable continued advancement, federal funding commitments must be sustained. PMID:28892451
Examination of the Open Market Corridor
2003-12-01
105 D. BENEFITS OF THE PURCHASE CARD PROGRAM ..........................107 1. List of Benefits ...107 2. Additional Benefits and How OMC Can Increase the Benefits ...107 E. WEAKNESSES OF...software licenses and support services. Estimated life-cycle costs for FY 1995 through FY 2005 are $3.7 billion. Operational benefits from SPS are
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-30
... Investments Under the Transportation, Housing and Urban Development, and Related Agencies Appropriations Act... grant program under the FY 2010 Appropriations Act. The DOT is referring to the grants for National... FY 2010 Appropriations Act, the DOT will evaluate all applications and announce the projects that...
45 CFR 305.42 - Penalty phase-in.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PROGRAM PERFORMANCE MEASURES, STANDARDS, FINANCIAL INCENTIVES, AND PENALTIES § 305.42 Penalty phase-in. States are subject to the performance penalties described in § 305.40 based on data reported for FY 2001. Data reported for FY 2000 will be used as a base year to determine improvements in performance during...
Colorado Children's Budget 2012
ERIC Educational Resources Information Center
Buck, Beverly; Cuciti, Peggy L.; Baker, Robin
2012-01-01
The "Colorado Children's Budget 2012" examines the state's commitment to investing in the well-being of children. It tallies up Colorado's actual and planned investment during the past five years (Fiscal Year (FY) 2008-2009 through FY 2012-2013) on programs and services in four areas: Early Childhood Learning and Development, K-12…
Colorado Children's Budget 2011
ERIC Educational Resources Information Center
Colorado Children's Campaign, 2011
2011-01-01
"Colorado Children's Budget 2011" tallies up Colorado's public investments during FY 2007-08 through FY 2011-12 for programs and services that enhance the well-being of children across four domains--Early Childhood, K-12 Education, Health, and Other Supports. It is intended to be a resource guide for policymakers and advocates who are…
DOT National Transportation Integrated Search
2012-09-30
In FY 2007, Federal and State enforcement personnel conducted more than 15,000 CRs on individual motor carriers. It is intended that through education, heightened safety regulation awareness, and the enforcement effects of the CR, carriers will impro...
U.S. Army Research Institute Program in Basic Research FY 2005 and FY 2006
2007-11-01
designed to tap different levels of processing-from visual attention (measured via eye-tracking) and interpretation through memory and decision-making (e.g...Test ( EFT ; Witkin, 1950; Witkin, Dyk, Faterson, Goodenough, & Karp, 1962) modified for group administration. It measures competence in perceptual field
Space directorate research and technology accomplishments for FY 1988
NASA Technical Reports Server (NTRS)
Avery, Don E. (Compiler)
1989-01-01
The major accomplishments and test highlights for FY 1988 that occurred in the Space Dirctorate are given. Accomplishments and test highlights are presented by Division and Branch. The presented information will be useful in program coordination with government organizations, universities, and industry in areas of mutual interest.
Military Manpower Training Report for FY 1976.
ERIC Educational Resources Information Center
Office of the Assistant Secretary of Defense for Manpower and Reserve Affairs (DOD), Washington, DC.
The document presents anticipated needs and costs for training military personnel in FY 1976, based on national security objectives. Training loads for each of the following categories are presented with supporting tables: (1) recruit training, (2) officer acquisition training, (3) specialized skill training, (4) flight training programs, and (5)…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-29
... early childhood education, adult education, and/or job training programs for public housing residents... Information Collection for Public Comment; FY 2010 Capital Fund Community and Education Training Facilities... 2010 Capital Fund Community and Education Training Facilities NOFA. OMB Control Number: 2577-0268...
Intelligent Vehicle Mobility M&S Capability Development (FY13 innovation Project) (Briefing Charts)
2014-05-19
Intelligent Vehicle Mobility M&S Capability Development (FY13 Innovation Project) P. Jayakumar and J. Raymond, Analytics 19 May 2014...PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Paramsithy Jayakumar ; J Raymond 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING
Rep. Harman, Jane [D-CA-36
2009-09-23
House - 10/15/2009 Ordered to be Reported by Voice Vote. (All Actions) Notes: For further action, see S.1694, which became Public Law 111-96 on 11/6/2009. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
Microgravity science and applications: Program tasks and bibliography for FY 1992
NASA Technical Reports Server (NTRS)
1993-01-01
This report is a compilation of the FY 1992 Principal Investigator program task descriptions funded by the Microgravity Science and Applications Division (MSAD), NASA Headquarters, Washington, DC. The document also provides a bibliography of FY 1992 publications and presentations cited by MSAD Principal Investigators, and an index of the Principal Investigators and their affiliations. The purpose of the document is to provide an overview and progress report for the funded tasks for scientists and researchers in industry, university, and government communities. The tasks are grouped into three categories appropriate to the type of research being done-space flight, ground based, and advanced technology development-and by science discipline. The science disciplines are: biotechnology, combustion science,, electronic materials, fluid physics, fundamental physics, glass and ceramics, metals and alloys, and protein crystal growth.
FY2017 Electrification Annual Progress Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
During fiscal year 2017 (FY 2017), the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO) funded early stage research & development (R&D) projects that address Batteries and Electrification of the U.S. transportation sector. The VTO Electrification Sub-Program is composed of Electric Drive Technologies, and Grid Integration activities. The Electric Drive Technologies group conducts R&D projects that advance Electric Motors and Power Electronics technologies. The Grid and Charging Infrastructure group conducts R&D projects that advance Grid Modernization and Electric Vehicle Charging technologies. This document presents a brief overview of the Electrification Sub-Program and progress reports for its R&D projects. Eachmore » of the progress reports provide a project overview and highlights of the technical results that were accomplished in FY 2017.« less
Spacecraft Status Report: 2001 Mars Odyssey
NASA Technical Reports Server (NTRS)
Boyles, Carole
2012-01-01
Fourth extension of Odyssey mission continues, with orbital science investigations and relay services for landed assets. Mitigation of aging IMU and UHF transceiver. ODY has responded to Program Office/board recommendations. All Stellar mode has been certified for flight operations and is now standard for nadir point operations on the A-side. Investigating options to mitigate aging Battery. Gradual transfer to a later LMST orbit node to shorten eclipse durations. Reduce spacecraft loads during the longer eclipses. Optimize battery performance. ODY is preparing for E5 Proposal and Planetary Science Division FY12 Senior Review activities. ODY is on track to support MSL EDL and surface operations. ODY is managing consumables in order to remain in operations until 2020.
ARIES Oxide Production Program Assessment of Risk to Long-term Sustainable Production Rate
DOE Office of Scientific and Technical Information (OSTI.GOV)
Whitworth, Julia; Lloyd, Jane Alexandria; Majors, Harry W.
2017-05-04
This report describes an assessment of risks and the development of a risk watch list for the ARIES Oxide Production Program conducted in the Plutonium Facility at LANL. The watch list is an active list of potential risks and opportunities that the management team periodically considers to maximize the likelihood of program success. The initial assessments were made in FY 16. The initial watch list was reviewed in September 2016. The initial report was not issued. Revision 1 has been developed based on management review of the original watch list and includes changes that occurred during FY-16.
2000-02-28
iIÄ»lllilil^» P «lMlii fport INSPECTOR GENERAL, DOD, OVERSIGHT OF THE ARMY AUDIT AGENCY AUDIT OF THE FY 1999 U.S. ARMY CORPS OF ENGINEERS, CIVIL...WORKS PROGRAM, FINANCIAL STATEMENTS Report No. D -2000-093 February 28, 2000 pnc QXIAUTY mm®™* i 0ffice Qf ±Q hispdCtor General Department of...Works Program, Financial Statements (Report No. D -2000-093) We are providing this audit report for your information and use and for transmittal to
Consolidated Appropriations Act, 2010
Rep. Olver, John W. [D-MA-1
2009-07-22
12/16/2009 Became Public Law No: 111-117. (TXT | PDF) (All Actions) Notes: The conference report on the bill includes provisions for 6 of the 12 FY2010 appropriations: Transportation-HUD; Commerce-Justice-Science; Financial Services; Labor-HHS; Military Construction-VA; and State-Foreign Operations. Tracker: This bill has the status Became LawHere are the steps for Status of Legislation:
Fact Sheet: Selected Highlights of the FY2017 National Defense Authorization Act (H.R. 4909)
2016-05-12
shaped by the legally binding caps on discretionary spending for defense programs and for non-defense programs, which were established by P.L. 114-74...of Defense (DOD) funding for FY2017 that (1) exceeds the relevant BBA cap ; and (2) is exempt from that spending cap because it is classified as...funding for so- called Overseas Contingency Operations (OCO). The 2015 BBA increased binding caps on defense and non-defense discretionary appropriations
Building America Systems Integration Research Annual Report. FY 2012
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gestwick, Michael
2013-05-01
This Building America FY2012 Annual Report includes an overview of the Building America Program activities and the work completed by the National Renewable Energy Laboratory and the Building America industry consortia (the Building America teams). The annual report summarizes major technical accomplishments and progress towards U.S. Department of Energy Building Technologies Program's multi-year goal of developing the systems innovations that enable risk-free, cost effective, reliable and durable efficiency solutions that reduce energy use by 30%-50% in both new and existing homes.
Status Report on NEAMS System Analysis Module Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hu, R.; Fanning, T. H.; Sumner, T.
2015-12-01
Under the Reactor Product Line (RPL) of DOE-NE’s Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, an advanced SFR System Analysis Module (SAM) is being developed at Argonne National Laboratory. The goal of the SAM development is to provide fast-running, improved-fidelity, whole-plant transient analyses capabilities. SAM utilizes an object-oriented application framework MOOSE), and its underlying meshing and finite-element library libMesh, as well as linear and non-linear solvers PETSc, to leverage modern advanced software environments and numerical methods. It also incorporates advances in physical and empirical models and seeks closure models based on information from high-fidelity simulations and experiments. This reportmore » provides an update on the SAM development, and summarizes the activities performed in FY15 and the first quarter of FY16. The tasks include: (1) implement the support of 2nd-order finite elements in SAM components for improved accuracy and computational efficiency; (2) improve the conjugate heat transfer modeling and develop pseudo 3-D full-core reactor heat transfer capabilities; (3) perform verification and validation tests as well as demonstration simulations; (4) develop the coupling requirements for SAS4A/SASSYS-1 and SAM integration.« less
FY16 LLNL Omega Experimental Programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heeter, R. F.; Ali, S. J.; Benstead, J.
In FY16, LLNL’s High-Energy-Density Physics (HED) and Indirect Drive Inertial Confinement Fusion (ICF-ID) programs conducted several campaigns on the OMEGA laser system and on the EP laser system, as well as campaigns that used the OMEGA and EP beams jointly. Overall, these LLNL programs led 430 target shots in FY16, with 304 shots using just the OMEGA laser system, and 126 shots using just the EP laser system. Approximately 21% of the total number of shots (77 OMEGA shots and 14 EP shots) supported the Indirect Drive Inertial Confinement Fusion Campaign (ICF-ID). The remaining 79% (227 OMEGA shots and 112more » EP shots) were dedicated to experiments for High-Energy-Density Physics (HED). Highlights of the various HED and ICF campaigns are summarized in the following reports. In addition to these experiments, LLNL Principal Investigators led a variety of Laboratory Basic Science campaigns using OMEGA and EP, including 81 target shots using just OMEGA and 42 shots using just EP. The highlights of these are also summarized, following the ICF and HED campaigns. Overall, LLNL PIs led a total of 553 shots at LLE in FY 2016. In addition, LLNL PIs also supported 57 NLUF shots on Omega and 31 NLUF shots on EP, in collaboration with the academic community.« less
2000-02-01
CONSIDERATIONS ix-xx FUTURE YEARS DEFENSE PLAN AUDIT TRAIL xxi-xxiii PROJECT JUSTIFICATION DOCUMENTS 1-149 PLANNING & DESIGN JUSTIFICATION DOCUMENT 15 0...OUTSTANDING POLUTION AND SAFETY DEFICIENCIES: DDl°™1390s2 MAY 78 1. COMPONENT FY 2001 GUARD AND RESERVE 2. DATE ARNG MILITARY CONSTRUCTION FEB00 3...TOTAL 36 286 13 MAJOR EQUIPMENT AND AIRCRAFT TYPE AUTHORIZED ASSIGNED 14. OUTSTANDING POLUTION AND SAFETY DEFICIENCIES: DD:A O™1390S2 1
1986-02-05
saries. When have these values -- freedom of individual citizens, democratically chosen governments, market economies, and a lawful international economic...to the plan of action for pene- trating a new market . In addition to the broad goals of the firm, strategy encompasses key operating policies by...threats on the other. A sustainable corporate strategy must match the particular strengths of the corporation with competitive forces in its markets
1989-01-01
environmental review process as indicated by the County Traffic Engineers for safe and secure transport of ordnance as well as the chosen alternative...from other appropriations: None. PRVOSEDITION$ MAY SE USED ITRALDD DE 7 PG NO.DD • 391C UNTIL XHAUSTEDP N. S.PRRMELMN . CATGOR OO 7..POETNMER U JC...service. IMPACT IF NOT PROVIDED: Activity must rely r.n truck refuelers which are not Capable of handling the demand. Time delays, logisticA and safety
Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress
2016-03-08
Search Radar modification to CVN–79 and CVN–80. (G) A business case analysis for the two-phase CVN–79 delivery proposal and impact on fleet...the start-stop-start-stop cycle over a stretched period of time and that’s a big cost impact . But the challenge is by the same token, the build cycle...What are the estimated savings of this proposal in FY2017, and over the FY2017-FY2021 Future Years Defense Plan (FYDP)? What impact would
2016-01-29
No. DODIG-2016-041 J A N U A R Y 2 9 , 2 0 1 6 Independent Auditor’s Report on the FY 2015 DoD Detailed Accounting Report for the Funds...Defense that supports the warfighter; promotes accountability , integrity, and efficiency; advises the Secretary of Defense and Congress; and informs...THE ARMY SUBJECT: Independent Auditor’s Report on the FY 2015 DoD Detailed Accounting Report for the Funds Obligated for National Drug Control
1976-01-27
further support reductions would be inadvisable. Therefore, it may be necessaty to maintain the combat-to-support ratio at Vie post-Nunn Amendment level...263 Acquisition of the A-10 Clow Art Support Aircraft 266 457 81 618 927 Durefopment and Acquisition of E-3A AWACS 1 610 466 8t 684 466 Oftelopment n...understanding of both pertinent technology a’nd management principles to ensure their continued contribution to the force, Such schooling , whether geared to
Lewis and Clark National Historical Park Elk Monitoring Program Annual Report 2010
Cole, Carla; Griffin, Paul; Jenkins, Kurt
2012-01-01
Data from FY09, FY10, and FY11 will be useful in the formal analyses of trend. Those three years of data will contribute to the preparation of a four-year analysis and report after only one more year. Quantitative estimates of relative use by elk throughout the Fort Clatsop unit will be provided in the four-year report in 2012. Those estimates will account for detection bias, which comes from an incomplete count of elk pellets that were present in the subplots at the time of survey.
Introduction to Space Station Freedom
NASA Technical Reports Server (NTRS)
Kohrs, Richard
1992-01-01
NASA field centers and contractors are organized to develop 'work packages' for Space Station Freedom. Marshall Space Flight Center and Boeing are building the U.S. laboratory and habitation modules, nodes, and environmental control and life support system; Johnson Space Center and McDonnell Douglas are responsible for truss structure, data management, propulsion systems, thermal control, and communications and guidance; Lewis Research Center and Rocketdyne are developing the power system. The Canadian Space Agency (CSA) is contributing a Mobile Servicing Center, Special Dextrous Manipulator, and Mobile Servicing Center Maintenance Depot. The National Space Development Agency of Japan (NASDA) is contributing a Japanese Experiment Module (JEM), which includes a pressurized module, logistics module, and exposed experiment facility. The European Space Agency (ESA) is contributing the Columbus laboratory module. NASA ground facilities, now in various stages of development to support Space Station Freedom, include: Marshall Space Flight Center's Payload Operations Integration Center and Payload Training Complex (Alabama), Johnson Space Center's Space Station Control Center and Space Station Training Facility (Texas), Lewis Research Center's Power System Facility (Ohio), and Kennedy Space Center's Space Station Processing Facility (Florida). Budget appropriations impact the development of the Space Station. In Fiscal Year 1988, Congress appropriated only half of the funds that NASA requested for the space station program ($393 million vs. $767 million). In FY 89, NASA sought $967 million for the program, and Congress appropriated $900 million. NASA's FY 90 request was $2.05 billion compared to an appropriation of $1.75 billion; the FY 91 request was $2.45 billion, and the appropriation was $1.9 billion. After NASA restructured the Space Station Freedom program in response to directions from Congress, the agency's full budget request of $2.029 billion for Space Station Freedom in FY 92 was appropriated. For FY 93, NASA is seeking $2.25 billion for the program; the planned budget for FY 94 is $2.5 billion. Further alterations to the hardware configuration for Freedom would be a serious setback; NASA intends 'to stick with the current baseline' and continue planning for utilization.
Federal Geothermal Research Program Update Fiscal Year 2002
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2003-09-01
The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The goals are: (1) Double the number of States with geothermal electric power facilities to eight by 2006; (2) Reduce the levelized cost of generating geothermal power to 3-5 cents per kWh by 2007; and (3) Supply the electrical power or heat energy needs of 7 million homes and businesses in themore » United States by 2010. This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2002. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy. balanced strategy for the Geothermal Program.« less
75 FR 341 - FY 2010-FY 2011 Broad Agency Announcement
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-05
... Agency's strategic plan and mission goals, as well as to provide the general public with information and... and programs associated with the Agency's strategic plan and mission goals, as well as to provide the... systematic approach that links our strategic goals through multi-year plans to the daily activities of our...
Data and Characteristics of the Illinois Public Community College System.
ERIC Educational Resources Information Center
Illinois Community Coll. Board, Springfield.
Data on the Illinois public community colleges, covering fiscal year (FY) 1991 and part of FY 1992, are presented in this report on the system's students, faculty, staff, instructional programs, operating finances, and capital construction. Introductory material provides a profile of the colleges, a map of college districts, and a list of…
Data and Characteristics of the Illinois Public Community College System.
ERIC Educational Resources Information Center
Illinois Community Coll. Board, Springfield.
Data on the Illinois public community colleges, covering fiscal year (FY) 1990 and part of FY 1991, are presented in this report on the system's students, faculty, staff, instructional programs, operating finances, and capital construction. After introductory material provides a profile of the colleges and a map of college districts, section I…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-26
... for programs authorized by Title VI of the Higher Education Act (HEA) that the Department expects to... DEPARTMENT OF EDUCATION Notice of a Joint Technical Assistance Workshop for Preparing Fiscal Year (FY) 2014 Grant Applications AGENCY: International and Foreign Language Education, Office of...
DOT National Transportation Integrated Search
2010-05-01
This report presents the regional conformity analysis and recommendation for a finding : of conformity for the Hampton Roads 2030 Long Range Transportation Plan (LRTP, or : "Plan") and associated Fiscal Year (FY) 2009-2012 Transportation Improvement ...
USDA-ARS?s Scientific Manuscript database
Fillet yield (FY, %) is an economically important trait in rainbow trout aquaculture that reflects production efficiency. Despite that, FY has not received much attention in breeding programs because it is costly to measure and difficult to select on, limiting the genetic progress in traditional sel...
Navy Littoral Combat Ship (LCS)/Frigate Program: Background and Issues for Congress
2015-12-22
the ships. The Navy continues to review manning to determine appropriate levels, and is adding 20 berths to all seaframes. The increased berthing ...ships would determine the allocation of the three FY2010 ships, with the winning team getting two of the FY2010 ships and the other team getting one
NASA Technical Reports Server (NTRS)
Hoffman, S.
1979-01-01
Approximately 512 bibliographies are presented for the time period from FY 77 to FY 79. Several non-SCR publications and a few papers not included in the last publication are included. Topics include propulsion, stratospheric emissions impact, materials and structure, aerodynamic performance, and stability and control.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-18
... application process, funding criteria and eligibility requirements can be found using the Department of... Education and Training Community Facilities (CFCF) Program is 14-890. Applications must be submitted...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Capital Fund Education and Training...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-29
... FY 2015 new medical services and technologies applications meet the substantial clinical improvement... new medical services and technologies under Medicare. Effective for discharges beginning on or after... specifies that a medical service or technology will be considered ``new'' if it meets criteria established...
78 FR 7750 - Emergency Food Assistance Program; Availability of Foods for Fiscal Year 2013
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-04
..., fish, vegetables, dry beans, juices, and fruits. Approximately $274.5 million in surplus foods acquired in FY 2012 are being delivered to States in FY 2013. These foods include beans (dried, canned..., frozen ham, frozen turkey roast, blackeye beans, garbanzo beans, great northern beans, light red kidney...
Oak Ridge National Laboratory Institutional Plan, FY 1995--FY 2000
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-11-01
This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years (1995-2000). Included in this report are the: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; and resource projections.
DOT National Transportation Integrated Search
2010-05-01
This report presents the regional conformity analysis and recommendation for a finding of conformity for the Hampton Roads 2030 Long Range Transportation Plan (LRTP, or "Plan") and associated Fiscal Year (FY) 2009-2012 Transportation Improvement Prog...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-26
... Skilled Nursing Facilities for FY 2012; Correction AGENCY: Centers for Medicare & Medicaid Services (CMS... Nursing Facilities for FY 2012'' that appeared in the August 8, 2011 Federal Register. DATES: Effective... October 1, 2011. II. Summary of Errors The Addendum to the Skilled Nursing Facility (SNF) Prospective...
Evaluation of Educational Personnel Development Projects in Indian Education. Final Report.
ERIC Educational Resources Information Center
Wechsler, Marjorie E.; And Others
The Educational Personnel Development (EPD) program provides training for educational personnel to serve American Indian and Alaska Native students. From FY 1987 to FY 1991, EPD grants averaging $2.25 million per year were awarded to 21 institutions, which provided academic counseling, direct financial assistance, and supplemental training to a…
Venus Data Analysis Program: Directory of Research Projects (1993-1994)
NASA Technical Reports Server (NTRS)
1994-01-01
This directory provides information about the scientific investigations funded by the NASA Venus Data Analysis Program (VDAP) during fiscal year 1993. The VDAP Directory consists of summary sheets from the proposals that were selected by NASA for funding in FY 93. Each summary sheet indicates the title, principal investigator, institution of the investigation, and information related to the objectives of the research activities proposed for FY 93. The objective of the VDAP Program is to advance our understanding of the nature and evolution of Venus. VDAP supports scientific investigation using data obtained from the Magellan, Pioneer Venus, and other Venus missions, as well as earth-based observations that contribute to understanding the physical and evolutionary properties of Venus. The program intends to enhance the scientific return from these missions by broadening the participation in the analysis of Venus data. Categories of research funded by VDAP are atmosphere, ionosphere, geology, geophysics, and mapping. The directory is intended to provide the science community with an overview of the research projects supported by this program. Research activities identified in this directory were selected for funding in FY 93 on the basis of scientific peer review conducted by the VDAP Review Panel.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trotter, Patrick C.
2001-10-01
The 1994 Fish and Wildlife Program of the Northwest Power Planning Council specifies the recovery and preservation of population health of native resident fishes of the Columbia River Basin. Among the native resident species of concern are interior rainbow trout of the Columbia River redband subspecies Oncorhynchus mykiss gairdneri 1 and westslope cutthroat trout O. clarki lewisi. The westslope cutthroat trout has been petitioned for listing under the U. S. Endangered Species Act (American Wildlands et al. 1997). Before at-risk populations can be protected, their presence and status must be established. Where introgression from introduced species is a concern, asmore » in the case of both westslope cutthroat trout and redband rainbow trout, genetic issues must be addressed as well. As is true with native trout elsewhere in the western United States (Behnke 1992), most of the remaining pure populations of these species in the Columbia River Basin are in relatively remote headwater reaches. The objective of this project was to photo-document upper Columbia Basin native resident trout populations in Washington, and to ascertain their species or subspecies identity and relative genetic purity using a nonlethal DNA technique. FY-2001 was year three (and final year) of a project in which we conducted field visits to remote locations to seek out and catalog these populations. In FY-2001 we worked in collaboration with the Wenatchee National Forest to catalog populations in the Wenatchee, Entiat, Lake Chelan, and Methow River drainages of Washington State.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trotter, Patrick C.
2001-05-01
The 1994 Fish and Wildlife Program of the Northwest Power Planning Council specifies the recovery and preservation of population health of native resident fishes of the Columbia River Basin. Among the native resident species of concern are interior rainbow trout of the Columbia River redband subspecies Oncorhynchus mykiss gairdneri 1 and westslope cutthroat trout O. clarki lewisi. The westslope cutthroat trout has been petitioned for listing under the U. S. Endangered Species Act (American Wildlands et al. 1997). Before at-risk populations can be protected, their presence and status must be established. Where introgression from introduced species is a concern, asmore » in the case of both westslope cutthroat trout and redband rainbow trout, genetic issues must be addressed as well. As is true with native trout elsewhere in the western United States (Behnke 1992), most of the remaining pure populations of these species in the Columbia River Basin are in relatively remote headwater reaches. The objective of this project is to photo-document upper Columbia Basin native resident trout populations in Washington, and to ascertain their species or subspecies identity and relative genetic purity using a nonlethal DNA technique. FY-99 was year two of a five-year project in which we conducted field visits to remote locations to seek out and catalog these populations. In FY-99 we worked in collaboration with the Colville National Forest and Kalispel Indian Tribe to catalog populations in the northeastern corner of Washington State.« less
2016-08-05
This final rule updates the payment rates used under the prospective payment system (PPS) for skilled nursing facilities (SNFs) for fiscal year (FY) 2017. In addition, it specifies a potentially preventable readmission measure for the Skilled Nursing Facility Value-Based Purchasing Program (SNF VBP), and implements requirements for that program, including performance standards, a scoring methodology, and a review and correction process for performance information to be made public, aimed at implementing value-based purchasing for SNFs. Additionally, this final rule includes additional polices and measures in the Skilled Nursing Facility Quality Reporting Program (SNF QRP). This final rule also responds to comments on the SNF Payment Models Research (PMR) project.
Fossil energy waste management. Technology status report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bossart, S.J.; Newman, D.A.
1995-02-01
This report describes the current status and recent accomplishments of the Fossil Energy Waste Management (FE WM) projects sponsored by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The primary goal of the Waste Management Program is to identify and develop optimal strategies to manage solid by-products from advanced coal technologies for the purpose of ensuring the competitiveness of advanced coal technologies as a future energy source. The projects in the Fossil Energy Waste Management Program are divided into three types of activities: Waste Characterization, Disposal Technologies, and Utilization Technologies. This technology status report includesmore » a discussion on barriers to increased use of coal by-products. Also, the major technical and nontechnical challenges currently being addressed by the FE WM program are discussed. A bibliography of 96 citations and a list of project contacts is included if the reader is interested in obtaining additional information about the FE WM program.« less
Indiana chronic disease management program risk stratification analysis.
Li, Jingjin; Holmes, Ann M; Rosenman, Marc B; Katz, Barry P; Downs, Stephen M; Murray, Michael D; Ackermann, Ronald T; Inui, Thomas S
2005-10-01
The objective of this study was to compare the ability of risk stratification models derived from administrative data to classify groups of patients for enrollment in a tailored chronic disease management program. This study included 19,548 Medicaid patients with chronic heart failure or diabetes in the Indiana Medicaid data warehouse during 2001 and 2002. To predict costs (total claims paid) in FY 2002, we considered candidate predictor variables available in FY 2001, including patient characteristics, the number and type of prescription medications, laboratory tests, pharmacy charges, and utilization of primary, specialty, inpatient, emergency department, nursing home, and home health care. We built prospective models to identify patients with different levels of expenditure. Model fit was assessed using R statistics, whereas discrimination was assessed using the weighted kappa statistic, predictive ratios, and the area under the receiver operating characteristic curve. We found a simple least-squares regression model in which logged total charges in FY 2002 were regressed on the log of total charges in FY 2001, the number of prescriptions filled in FY 2001, and the FY 2001 eligibility category, performed as well as more complex models. This simple 3-parameter model had an R of 0.30 and, in terms in classification efficiency, had a sensitivity of 0.57, a specificity of 0.90, an area under the receiver operator curve of 0.80, and a weighted kappa statistic of 0.51. This simple model based on readily available administrative data stratified Medicaid members according to predicted future utilization as well as more complicated models.
Air Force Handbook. 109th Congress
2009-01-01
FY06 Combat Survivor Evader Locator (CSEL) Acquisition Status Capabilities/Profile Functions /Performance Parameters 38 • Air Force’s primary source for...Broadcast Service (GBS) Capabilities/Profile Acquisition Status Functions /Performance Parameters • Purchase Requirements (Phase 2): • 3 primary ...Operations (AF CONOPS) that support the CSAF and joint vision of combat operations. • AF CONOPS describe key Air Force mission and/or functional areas
Pointing and control system enabling technology for future automated space missions
NASA Technical Reports Server (NTRS)
Dahlgren, J. B.
1978-01-01
Future automated space missions present challenging opportunities in the pointing-and-control technology disciplines. The enabling pointing-and-control system technologies for missions from 1985 to the year 2000 were identified and assessed. A generic mission set including Earth orbiter, planetary, and other missions which predominantly drive the pointing-and-control requirements was selected for detailed evaluation. Technology candidates identified were prioritized as planning options for future NASA-OAST advanced development programs. The primary technology thrusts in each candidate program were cited, and advanced development programs in pointing-and-control were recommended for the FY 80 to FY 87 period, based on these technology thrusts.