Sample records for program interim evaluation

  1. Faculty and Student Views of the Interim Term

    ERIC Educational Resources Information Center

    Centra, John A.; Sobol, Marion G.

    1974-01-01

    Evaluations of the interim term or 4-1-4 program at various colleges have been generally favorable. A detailed evaluation of the Rider College interim study program based on faculty and student reports indicated that the more nontraditionally oriented courses were rated higher than the more traditional offerings. (Editor/PG)

  2. 76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... NRC staff's evaluation of the suitability of using Revision 3 of the Nuclear Energy Institute's (NEI... NUCLEAR REGULATORY COMMISSION [NRC-2011-0228] Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance...

  3. National Home Start Evaluation. Interim Report V: Case Studies.

    ERIC Educational Resources Information Center

    Jerome, Chris H.; And Others

    One of a series of documents on the evaluation of the National Home Start (NHS) program this third year interim report of case studies describes program efforts and successes with 16 Home Start families throughout the nation. A federally funded demonstration program, NHS is aimed at providing home-based services (such as health, education,…

  4. National Home Start Evaluation Interim Report VII. Twenty-Month Program Analysis and Findings.

    ERIC Educational Resources Information Center

    Love, John M.; And Others

    This interim evaluation report focuses on process (formative) and outcome (summative) data collected in spring 1975 on the National Home Start Program. Home Start, a federally-funded 3-year (1972-1975) home-based demonstration program for low-income families with 3- to 5-year-old children was designed to enhance a mother's skills in dealing with…

  5. A Process Evaluation of Project Developmental Continuity. Interim Report IV, Volume 2: Development of the Implementation and Cost Studies.

    ERIC Educational Resources Information Center

    Smith, Allen G.; And Others

    This interim report describes the development of program implementation and cost studies for Year II of the process evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Specific areas focused…

  6. The Evaluation of Abstinence Education Programs Funded Under Title V Section 510: Interim Report.

    ERIC Educational Resources Information Center

    Devaney, Barbara; Johnson, Amy; Maynard, Rebecca; Trenholm, Chris

    This report presents interim findings from an independent, federally funded evaluation of the abstinence education programs authorized under the Personal Responsibility and Work Opportunity Reconciliation Act (PRWORA) and defined under Title V, Section 510 (b)(2)(A-H) of the Social Security Act. The report draws heavily on 4 years of…

  7. Interim Evaluation of the National Literacy Program. Final Report

    ERIC Educational Resources Information Center

    Human Resources and Social Development Canada, 2007

    2007-01-01

    The evaluation examined issues related to: (1) Rationale and Relevance; (2) Implementation; and (3) Success. In addition, the interim evaluation was intended to: (1) Determine whether sufficient data was being collected to inform the summative evaluation and identify opportunities for improvement to fill any potential gaps; (2) Assess whether the…

  8. Interim reliability evaluation program, Browns Ferry fault trees

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stewart, M.E.

    1981-01-01

    An abbreviated fault tree method is used to evaluate and model Browns Ferry systems in the Interim Reliability Evaluation programs, simplifying the recording and displaying of events, yet maintaining the system of identifying faults. The level of investigation is not changed. The analytical thought process inherent in the conventional method is not compromised. But the abbreviated method takes less time, and the fault modes are much more visible.

  9. A Process Evaluation of Project Developmental Continuity, Interim Report VII, Volume 1: Findings from the PDC Implementation Study.

    ERIC Educational Resources Information Center

    Smith, Allen G.; And Others

    This third year interim report, one of a series of documents on the evaluation of Project Developmental Continuity (PDC), presents findings from three major analyses of program implementation; measurement of the extent each program has implemented the basic PDC Guidelines; a description of patterns of that implementation; and analysis of some…

  10. A Process Evaluation of Project Developmental Continuity, Interim Report VII, Volume 3: Assessment of Program Impact Through the Head Start Year.

    ERIC Educational Resources Information Center

    Granville, Arthur C.; And Others

    This interim report, part of a series of documents examining the feasibility of the longitudinal evaluation of Project Developmental Continuity (PDC), presents the results of an analysis of PDC impact at the Head Start level, using Spring 1977 data. PDC is a Head Start Demonstration Program aimed at providing educational and developmental…

  11. A Process Evaluation of Project Developmental Continuity. Interim Report IV, Volume I: Pilot Year Impact Study--Instrument Characteristics and Attrition Trends.

    ERIC Educational Resources Information Center

    Granville, Arthur C.; And Others

    This interim report of a pilot year impact study on evaluation methodology is part of a series of documents on the evaluation of Project Developmental Continuity, a Head Start demonstration program aimed at promoting educational and developmental continuity between children's Head Start and primary school experiences. This report deals with…

  12. A Process Evaluation of Project Developmental Continuity, Interim Report VI: Recommendations for Continuing the Impact Study.

    ERIC Educational Resources Information Center

    Granville, Arthur; And Others

    This interim report re-examines data on instrument suitability, comparability of groups, and adequacy of sample size in Year III of the process evaluation of Project Developmental Continuity (PDC) and offers preliminary recommendations concerning the feasibility of continuing the impact study. PDC is a Head Start demonstration program aimed at…

  13. A Process Evaluation of Project Developmental Continuity. Interim Report III, Executive Summary: Preliminary Recommendations for the Study of Child Impact.

    ERIC Educational Resources Information Center

    Granville, Arthur C.; And Others

    This executive summary presents the major findings of Interim Report III, which reports preliminary evaluation of Project Developmental Continuity (PDC). A Head Start demonstration program, PDC is aimed at promoting greater educational and developmental continuity as children make the transition from preschool to school. The report addresses three…

  14. Evaluation of experimental flexible pavements : interim report no. 2.

    DOT National Transportation Integrated Search

    1975-01-01

    A program of construction and performance evaluation of seven Virginia flexible pavements containing at least some experimental features is reported. The objective of the program is to evaluate the performance of the pavements incorporating new or ti...

  15. Making the Transition: Interim Results of the National Guard Youth ChalleNGe Evaluation

    ERIC Educational Resources Information Center

    Millenky, Megan; Bloom, Dan; Dillon, Colleen

    2010-01-01

    Young people who drop out of high school face long odds of success in a labor market that increasingly values education and skills. This report presents interim results from a rigorous, ongoing evaluation of the National Guard Youth ChalleNGe Program, which aims to "reclaim the lives of at-risk youth" who have dropped out of high school.…

  16. Making the Transition: Interim Results of the National Guard Youth ChalleNGe Evaluation. [Executive Summary

    ERIC Educational Resources Information Center

    Millenky, Megan; Bloom, Dan; Dillon, Colleen

    2010-01-01

    Young people who drop out of high school face long odds of success in a labor market that increasingly values education and skills. This report presents interim results from a rigorous, ongoing evaluation of the National Guard Youth ChalleNGe Program, which aims to "reclaim the lives of at-risk youth" who have dropped out of high school. ChalleNGe…

  17. The Urban Consumer Education Project. Interim Report, 1979-80.

    ERIC Educational Resources Information Center

    Marshall, Gail; Haas, Kay

    This interim evaluation report of the St. Louis, Missouri Urban Consumer Education Project assesses program effectiveness in terms of teacher training and teacher knowledge of consumer basics, community resource participation, and student and teacher knowledge. The project was designed to teach fifth grade students their rights and…

  18. Skylab program earth resources experiment package sensor performance evaluation, volume 1, (S190A)

    NASA Technical Reports Server (NTRS)

    Kenney, G. P.

    1975-01-01

    The results of S190A sensor performance evaluation are summarized based on data presented by all contributors to the sensor performance evaluation interim reports. Techniques used in sensor performance evaluation are discussed. Topics discussed include: performance degradation identified during the Skylab missions, S190A and EREP system anomalies that affected S190A performance, and the performance achieved, in terms of pertinent S190A parameters. Additional analyses include final performance analyses completed after submittal of the SL4 interim sensor performance evaluation reports, including completion of detailed analyses of basic performance parameters initiated during the interim report periods and consolidation analyses to reduce independent mission data (SL2, SL3, and SL4) to determine overall performance realized during all three Skylab missions.

  19. Interim evaluation of the Tier 1 Program of Project P.A.T.H.S.: continuation of evidence.

    PubMed

    Shek, Daniel T L; Yu, Lu; Chan, Alex C W

    2012-01-17

    An interim evaluation study was conducted to understand the implementation of the Tier 1 Program of Project P.A.T.H.S. (Positive Adolescent Training through Holistic Social Programmes) in the 2008/09 school year. One hundred and twenty-eight schools were randomly selected to provide information on the implementation details of the program via interviews, telephone interviews and self-completed questionnaires. Results showed that a majority of the workers perceived that the students had positive responses to the program and the program was helpful to the students. Program workers' views toward the implementation of the Tier 1 Program were positive across different grades and program implementation modes. In conjunction with previous studies, the present findings suggest that the Tier 1 Program of Project P.A.T.H.S. is well received by different stakeholders.

  20. Implementation of the Career Education Incentive Act. First Interim Report on the Evaluability Assessment.

    ERIC Educational Resources Information Center

    Jung, Steven M.; And Others

    Survey activities are reported which were designed to provide the foundation for a national evaluation of the effectiveness of programs assisted under the Career Education Incentive Act of 1977 (PL 95-207). The methodology described, called "program evaluability assessment," focuses on detailed analysis of program assumptions in order to…

  1. Interim reliability-evaluation program: analysis of the Browns Ferry, Unit 1, nuclear plant. Appendix C - sequence quantification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mays, S.E.; Poloski, J.P.; Sullivan, W.H.

    1982-07-01

    This report describes a risk study of the Browns Ferry, Unit 1, nuclear plant. The study is one of four such studies sponsored by the NRC Office of Research, Division of Risk Assessment, as part of its Interim Reliability Evaluation Program (IREP), Phase II. This report is contained in four volumes: a main report and three appendixes. Appendix C generally describes the methods used to estimate accident sequence frequency values. Information is presented concerning the approach, example collection, failure data, candidate dominant sequences, uncertainty analysis, and sensitivity analysis.

  2. A Process Evaluation of Project Developmental Continuity. Interim Report VI: Executive Summary. Recommendations for Continuing the Impact Study.

    ERIC Educational Resources Information Center

    Granville, Arthur C.; Love, John M.

    This brief report summarizes the analysis and conclusions presented in detail in Interim Report VI regarding the feasibility of conducting a longitudinal study of Project Developmental Continuity (PDC). This project is a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and…

  3. Environmental Quality Technology Demonstration, Evaluation and Transfer Activities

    DTIC Science & Technology

    1996-12-02

    and Appropriate Requirements) and ARAR support documentation for interim and final Installation Restoration Program (IRP) remedial actions . During the...Relevant and Appropriate Requirements (ARARs) for Fort Devens , Massachusetts. Delivered Federal Environmental Legislative Power Curve in hard copy and... Remedial Actions . Delivered revised tables for Desk Guide on Interpretation of Applicable or Relevant and Appropriate Requirements — Interim Draft

  4. Interim reliability-evaluation program: analysis of the Browns Ferry, Unit 1, nuclear plant. Appendix B - system descriptions and fault trees

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mays, S.E.; Poloski, J.P.; Sullivan, W.H.

    1982-07-01

    This report describes a risk study of the Browns Ferry, Unit 1, nuclear plant. The study is one of four such studies sponsored by the NRC Office of Research, Division of Risk Assessment, as part of its Interim Reliability Evaluation Program (IREP), Phase II. This report is contained in four volumes: a main report and three appendixes. Appendix B provides a description of Browns Ferry, Unit 1, plant systems and the failure evaluation of those systems as they apply to accidents at Browns Ferry. Information is presented concerning front-line system fault analysis; support system fault analysis; human error models andmore » probabilities; and generic control circuit analyses.« less

  5. Home Start Evaluation Study. Interim Report II: Program Analysis. Revised Draft.

    ERIC Educational Resources Information Center

    Deloria, Dennis; And Others

    This document is the second in a series of evaluative reports directed to evaluation needs of Home Start planners and administrators. It focuses on implementation data about programs gathered during local site visits conducted in the spring and fall of 1972. The two basic evaluative questions asked are: (1) What was Home Start intended by its…

  6. Evaluation Design 1978-1979: ESAA Title I Migrant Program. Publication Number 78.11.

    ERIC Educational Resources Information Center

    Friedman, Myron; And Others

    To collect and disseminate information relevant to the accountability and program components of the Title I Migrant Program in the Austin school district and to report to the Texas Education Agency through interim and final reports on how well the migrant program is meeting its stated objectives for 1978-79 are the functions of the evaluation for…

  7. Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    TORRES, T.D.

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will bemore » exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the manufacturer's stated shelf life. In order to determine the transfer line service life this evaluation examines the certification of shelf life, the certification of chemical compatibility with waste, catalog information of ambient ratings and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials. During initial hose procurements, the hose-in-hose transfer line vendor River Bend Hose Specialty (RBHS) submitted a letter, dated 6/8/00, which recommended the service and shelf life of the hose to be seven years. In submittals for later hose procurements, RBHS submitted a letter, dated 11/6/00, which recommended the service life of the hose to be three years. This submittal was followed by documentation, on 2/14/01, which submitted new storage requirements and restated the seven year shelf life. RBHS revised their original hose service life estimate to a more conservative three years due to concerns over the effects of chemicals in transferred waste. The above mentioned submittals from RBHS are the primary drivers of the three year service life limit established by this document.« less

  8. Evaluating a Systemic Reform Project at the School District Level. Interim Report for the Fresno Systemic Program.

    ERIC Educational Resources Information Center

    Calhoun, Dave

    Systemic reform of mathematics and science education in K-12 schools, sponsored by the National Science Foundation (NSF), was instituted in 1991. Built into the initiatives were guidelines for local (internal) evaluation of programs. This paper is a summary of the evaluation conceptualizations and efforts of one evaluator at the Fresno Unified…

  9. Evaluation of the healthy schools program: Part I. Interim progress.

    PubMed

    Beam, Margaret; Ehrlich, Ginny; Donze Black, Jessica; Block, Audrey; Leviton, Laura C

    2012-01-01

    Federal and state policies identify schools as a setting to prevent childhood obesity, but schools need better health-promoting strategies. The objective of this study was to evaluate interim progress in schools receiving hands-on training from the Healthy Schools Program, the nation's largest school-based program aimed at preventing childhood obesity. The 4-year program targets schools with predominantly low-income, African American, or Hispanic students. In 2010 we assessed schools that enrolled in the 2007-2008 and 2008-2009 school years. School representatives completed an inventory of 8 content areas: policy and systems, school meals, competitive foods and beverages, health education, physical education, physical activity outside of physical education, before- and after-school programs, and school employee wellness. Schools' baseline inventory was compared by t test with the most recent inventory available. Schools made significant changes in all content areas, and effect sizes were moderate to large. Participating schools improved environmental policies and practices to prevent childhood obesity. The program is a resource to implement recent federal and state policies.

  10. Home Start Evaluation Study. Interim Case Studies IIa.

    ERIC Educational Resources Information Center

    Fein, Robert

    This formative evaluation study of Home Start uses a case study approach. A brief case study focuses on the administrative structure and staff resources and responsibilities of National Home Start. Also included are reports on seven local programs developed after two field visits had been made to each program. In the first visit, objectives chosen…

  11. An evaluation of the impact of the Virginia driver improvement program on negligent driving : 12-month report [interim report].

    DOT National Transportation Integrated Search

    1982-01-01

    This study sought to evaluate the impact of the four basic treatment combinations of the rehabilitation component of the Virginia driver improvement program. It was found that receipt of a warning letter from the Division of Motor Vehicles had no eff...

  12. Wheel/Rail Noise and Vibration Control

    DOT National Transportation Integrated Search

    1974-05-01

    Reported here are the interim results of a program under the UMTA Urban Rail Supporting Technology Program to develop a basic understanding of urban transit wheel/rail noise generation for application to the evaluation and improvement of wheel/rail n...

  13. 46 CFR 30.30-9 - Evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Evaluation. 30.30-9 Section 30.30-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS GENERAL PROVISIONS Interim Procedures for Evaluating Vessel Personnel Licensing and Certification Programs of Foreign Countries § 30.30-9 Evaluation. Materials...

  14. A longitudinal medical Spanish program at one US medical school.

    PubMed

    Reuland, Daniel S; Frasier, Pamela Y; Slatt, Lisa M; Alemán, Marco A

    2008-07-01

    Policymakers have recommended recruiting or training (or both) more US physicians who can provide care in Spanish. Few longitudinal medical Spanish programs have been described and evaluated. This study aims to describe development and evaluation of the preclinical phase of a 4-y program designed to graduate physicians who can provide language-concordant care in Spanish. Study was done in one public medical school in southeastern USA. The program targeted intermediate/advanced Spanish speakers. Standardized fluency assessments were used to determine eligibility and evaluate participants' progress. Curriculum included didactic coursework, simulated patients, socio-cultural seminars, clinical skills rotations at sites serving Latinos, service-learning, and international immersion. For the first two cohorts (n = 45) qualitative evaluation identified program improvement opportunities and found participants believed the program helped them maintain their Spanish skills. Mean interim (2-y) speaking proficiency scores were unchanged from baseline: 9.0 versus 8.7 at baseline on 12-point scale (p = 0.15). Mean interim listening comprehension scores (second cohort only, n = 25) increased from a baseline of 77 to 86% (p = 0.003). Proportions "passing" the listening comprehension test increased from 72 to 92% (p = 0.06). We describe development of a longitudinal Spanish program within a medical school. Participation was associated with improved Spanish listening comprehension and no change in speaking proficiency.

  15. Evaluation of arterial service patrol programs.

    DOT National Transportation Integrated Search

    2009-12-01

    This evaluation of the Arterial Service Patrol named I-64 Traffic Response (TR) is an interim report covering the first full year of operation. This Arterial Service Patrol was part of a regional traffic management strategy to address mobility issues...

  16. Assessment of Program Impact Through First Grade, Volume II: Impact on Institutions. An Evaluation of Project Developmental Continuity. Interim Report X.

    ERIC Educational Resources Information Center

    Rosario, Jose; And Others

    As part of a longitudinal study evaluating program effects, this report, the second in a series of six, describes the impact of Project Developmental Continuity (PDC) on the institutional policies and procedures of participating Head Start centers and elementary schools up to the time the evaluation study's cohort of children had completed grade…

  17. Evaluation of the Implementation of the Rural and Low-Income School (RLIS) Program: Interim Report

    ERIC Educational Resources Information Center

    Magill, Kathleen; Reeves, Cynthia; Hallberg, Kelly; Hinojosa, Trisha

    2009-01-01

    The Rural and Low-Income School (RLIS) program is part of the Rural Education Achievement Program (REAP) that was authorized under Title VI, Part B of the "Elementary and Secondary Act of 1965" ("ESEA"), as amended by the "No Child Left Behind Act of 2001" ("NCLB"). The RLIS program provides additional funds…

  18. Vibratory roller evaluation study : interim report No. 1.

    DOT National Transportation Integrated Search

    1974-08-01

    The Louisiana Department of Highways has in progress a two phase program to evaluate the use of vibratory rollers in the compaction of asphaltic concrete pavements. Phase one on the first construction project is now complete with eight different vibr...

  19. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...

  20. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...

  1. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...

  2. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...

  3. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...

  4. Petrotac bridge deck waterproofing membrane on Five Mile Creek Bridge : first interim report.

    DOT National Transportation Integrated Search

    1986-09-01

    During the 1970's, the Oregon State Highway Division was involved in a Federally funded experimental program to evaluate various waterproofing membrane systems for bridge decks. Through this program, a list of approved products and/or systems was dev...

  5. An evaluation of the short-term effects of the Virginia driver improvement program : interim report.

    DOT National Transportation Integrated Search

    1981-01-01

    This study attempted to determine the impact of the driver improvement program on Virginia's traffic and safety environment in terms of accidents and traffic convictions averted as a result of appropriate treatment, and to establish an ongoing system...

  6. Hazardous waste management programs; Florida: authorization for interim authorization phase I--Environmental Protection Agency. Notice of final determination.

    PubMed

    1982-05-07

    The State of Florida has applied for interim Authorization Phase I. EPA has reviewed Florida's application for Phase I and has determined that Florida's hazardous waste program is substantially equivalent to the Federal program covered by Phase I. The State of Florida is, hereby, granted Interim Authorization for Phase I to operate the State 's hazardous waste program, in lieu of the Federal program.

  7. A Process Evaluation of Project Developmental Continuity. Interim Report II, Part A: Program Case Studies. Volume 2.

    ERIC Educational Resources Information Center

    Spencer, Lynn, Ed.

    These 7 case studies are part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Each case study reviews the planning year at a PDC demonstration site in one…

  8. A Process Evaluation of Project Developmental Continuity. Interim Report II, Part A: Program Case Studies. Volume I.

    ERIC Educational Resources Information Center

    Spencer, Lynn, Ed.

    These 8 case studies are part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Each case study reviews the planning year at a PDC demonstration site in one…

  9. National Home Start Evaluation Interim Report VI. Twelve-Month Program Issues, Outcomes and Costs.

    ERIC Educational Resources Information Center

    Goodrich, Nancy; And Others

    This report assesses the progress of the six summative Home Start projects as evaluation families completed their first twelve months of enrollment. Home Start, a federally-funded 3-year (1972-1975) home-based demonstration program for low-income families with 3- to 5-year-old children was designed to enhance a mother's skills in dealing with her…

  10. 78 FR 20503 - Energy Conservation Program: Availability of the Interim Technical Support Document for High...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    ... Conservation Program: Availability of the Interim Technical Support Document for High-Intensity Discharge Lamps... high-intensity discharge (HID) lamps energy conservation standards in the Federal Register. This... interim analysis for high- intensity discharge lamps energy conservation standards. The notice provided...

  11. Putting Data to Work: Interim Recommendations from The Benchmarking Project

    ERIC Educational Resources Information Center

    Miles, Marty; Maguire, Sheila; Woodruff-Bolte, Stacy; Clymer, Carol

    2010-01-01

    As public and private funders have focused on evaluating the effectiveness of workforce development programs, a myriad of data collection systems and reporting processes have taken shape. Navigating these systems takes significant time and energy and often saps frontline providers' capacity to use data internally for program improvement.…

  12. Assessment of Program Impact Through First Grade, Volume III: Impact on Parents. An Evaluation of Project Developmental Continuity. Interim Report X.

    ERIC Educational Resources Information Center

    Morris, Mary; And Others

    Third in a series of six, this volume reports findings concerning the impact of Project Developmental Continuity (PDC) on the parents of the evaluation study's cohort of children as well as preliminary findings on the relationship between family characteristics and program outcome variables up to the time the children had completed grade 1. Begun…

  13. A Comprehensive Evaluation of the Community Action Program in Austin and Travis County, Texas. Final Report.

    ERIC Educational Resources Information Center

    Tracor, Inc., Austin, TX.

    Produced in four parts, this report covers a study of poor people in Austin, Texas, begun in 1967. Initial research efforts defined the problem and identified the population to be studied. An interim report was then made on the first year's findings. This involved evaluating some of the community action programs (CAP) and identifying and analyzing…

  14. French Interim MALE UAV Program

    DTIC Science & Technology

    2003-09-02

    MINISTÈRE DE LA DÉFENSE June, 13th 2002 Lcl Monsterleet FAF Staff J. Caron EADS S&DE-ISR FRENCH INTERIM MALE UAV PROGRAM 4 INDUSTRIAL STATUS Report...2003 2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE French Interim Male UAV Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c...PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) EADS

  15. Partnerships for Reform: Changing Teacher Preparation through the Title II HEA Partnership Program: Interim Report. PPSS 2003-8

    ERIC Educational Resources Information Center

    US Department of Education, 2004

    2004-01-01

    The Title II Higher Education Amendment (HEA) Partnership Grants Program provides grants to fund partnerships among colleges of education, schools of arts and sciences and local school districts in high-need areas. The goal of the program is to improve student achievement by increasing the quality of teachers. This evaluation examined the extent…

  16. Global Spent Fuel Logistics Systems Study (GSFLS). Volume 2. GSFLS visit findings and evaluations. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1978-01-31

    This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. This report describes a global framework that evaluates spent fuel disposition requirements, influencing factors and strategies. A broad sampling of foreign governmental officials, electric utility spokesmen and nuclear power industry officials responsible for GSFLS policies, plans and programs were surveyed as to their views with respect to national and international GSFLS related considerations. The results of these GSFLS visit findings are presented herein. These findings were then evaluated in terms of technical, institutional and legal/regulatory implications. The GSFLS evaluations, in conjunctionmore » with perceived US spent fuel objectives, formed the basis for selecting a set of GSFLS strategies which are reported herein.« less

  17. Reading First Implementation Evaluation: Interim Report

    ERIC Educational Resources Information Center

    Moss, Marc; Jacob, Robin; Boulay, Beth; Horst, Megan; Poulos, Jennifer

    2006-01-01

    In October 2003, the US Department of Education contracted with Abt Associates to design and conduct the Reading First Implementation Evaluation. This report focuses on the following questions: (1) How is the Reading First program implemented in districts and schools? and (2) How does reading instruction differ in Reading First schools and…

  18. Project PRIME. Interim Report Year One 1971-1972 (Purpose and Procedures).

    ERIC Educational Resources Information Center

    Kaufman, Martin J.; And Others

    Project PRIME (Programmed Re-Entry Into Mainstream Education) is concerned with evaluating the effectiveness of programs that aim at integration of handicapped children into regular classrooms. The main goals of the project are to determine which handicapped children can benefit from integration and under which conditions would it prove the most…

  19. Embarking on College and Career: Interim Evaluation of Urban Alliance. Research Report

    ERIC Educational Resources Information Center

    Theodos, Brett; Pergamit, Michael R.; Hanson, Devlin; Edelstein, Sara; Daniels, Rebecca

    2016-01-01

    Urban Alliance serves at-risk youth through its high school internship program, which provides training, mentoring, and work experience to high school seniors from distressed communities. The program aims to help youth move on to higher education or employment after graduation. The Urban Institute is conducting a six-year, randomized controlled…

  20. A Case Study of Technical Assistance to Demonstration Programs for Young Handicapped Children. Part I.

    ERIC Educational Resources Information Center

    Behr, Shirley K.; And Others

    The interim report presents an evaluation of TADS (Technical Assistance Development System) through case studies of TADS technical assistance to the staffs of two demonstration programs for preschool handicapped children and their families. Purposes of the study included obtaining indepth descriptions of the technical assistance process to…

  1. Experimental use of geogrids as an alternative to gravel placement : interim report - first year.

    DOT National Transportation Integrated Search

    2001-02-01

    With the ongoing demand for improved infrastructure, the Maine Department of : Transportation (MDOT) continues to identify and evaluate new and innovative : construction methods and materials. The Departments Capital Highway Improvement : Program ...

  2. Human factors experiments for data link : interim report 1

    DOT National Transportation Integrated Search

    1972-11-01

    This report discusses three experiments aimed at providing information pertinent to the Data Link Operational Experiments Program. Section 1. describes the evaluation of the WIDCOM, a visual display, and a voice synthesizer for providing ATC informat...

  3. Values, Valuing, and Evaluation. Research on Evaluation Program, Paper and Report Series. Interim Draft.

    ERIC Educational Resources Information Center

    Gephart, William J.

    The paper discusses the meaning of value and valuing, their roles in evaluation, and the potency of value systems in problem solving logic. Evaluation is defined as a process for facilitating decision making. A decision making situation occurs when there are options which are impossible to treat equivalently, and there is an impact in the…

  4. Job Training for the Homeless: Report on Demonstration's First Year. Research and Evaluation Report Series 91-F.

    ERIC Educational Resources Information Center

    Bailis, Lawrence N.; And Others

    An interim evaluation analyzed the first year of operation of the Job Training for the Homeless Demonstration Program (JTHDP). Data were collected from quarterly progress reports and evaluation reports submitted by 32 local JTHDP projects. The projects exceeded planned levels of clients served and achieved other positive outcomes, including…

  5. An interim prosthesis program for lower limb amputees: comparison of public and private models of service.

    PubMed

    Gordon, Robert; Magee, Christopher; Frazer, Anna; Evans, Craig; McCosker, Kathryn

    2010-06-01

    This study compared the outcomes of an interim mechanical prosthesis program for lower limb amputees operated under a public and private model of service. Over a two-year period, 60 transtibial amputees were fitted with an interim prosthesis as part of their early amputee care. Thirty-four patients received early amputee care under a public model of service, whereby a prosthetist was employed to provide the interim mechanical prosthesis service. The remaining 26 patients received early amputee care under a private model of service, where an external company was contracted to provide the interim mechanical prosthesis service. The results suggested comparable clinical outcomes between the two patient groups. However, the public model appeared to be less expensive with the average labour cost per patient being 29.0% lower compared with the private model. The results suggest that a public model of service may provide a more comprehensive and less expensive interim prosthesis program for lower limb amputees.

  6. A Continuum Approach for Developing School Leaders in an Urban District

    ERIC Educational Resources Information Center

    Normore, Anthony

    2007-01-01

    This study examined a four-staged leadership development continuum for school leaders in a large urban school district in the southeastern United States. The program under examination included: LEAD Program; Interim Assistant Principal Program; Intern Principal Program, and; First Year Principal Support/Interim Principal Program. Qualitative…

  7. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim registration review decision... PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.56 Interim registration review decision. The Agency may issue, when it determines it to be appropriate, an interim...

  8. National School Lunch Program and School Breakfast Program: Nutrition Standards for All Foods Sold in School as Required by the Healthy, Hunger-Free Kids Act of 2010. Final rule and interim final rule.

    PubMed

    2016-07-29

    This rule adopts as final, with some modifications, the National School Lunch Program and School Breakfast Program regulations set forth in the interim final rule published in the Federal Register on June 28, 2013. The requirements addressed in this rule conform to the provisions in the Healthy, Hunger-Free Kids Act of 2010 regarding nutrition standards for all foods sold in schools, other than food sold under the lunch and breakfast programs. Most provisions of this final rule were implemented on July 1, 2014, a full year subsequent to publication of the interim final rule. This was in compliance with section 208 of the Healthy, Hunger-Free Kids Act of 2010, which required that State and local educational agencies have at least one full school year from the date of publication of the interim final rule to implement the competitive food provisions. Based on comments received on the interim final rule and implementation experience, this final rule makes a few modifications to the nutrition standards for all foods sold in schools implemented on July 1, 2014. In addition, this final rule codifies specific policy guidance issued after publication of the interim rule. Finally, this rule retains the provision related to the standard for total fat as interim and requests further comment on this single standard.

  9. 76 FR 43571 - Small Business HUBZone Program; Government Contracting Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 126 RIN 3245-AG45 Small Business HUBZone Program; Government Contracting Programs AGENCY: U.S. Small Business Administration. ACTION: Interim final rule with request for comments. SUMMARY: This interim final rule amends the U.S. Small Business Administration's...

  10. 42 CFR 418.307 - Periodic interim payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments... payments. The biweekly interim payment amount is based on the total estimated Medicare payments for the...

  11. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes of...

  12. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  13. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  14. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  15. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  16. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  17. State-Wide Evaluation of the New Hampshire ESEA Title II, Part D Grant Program. Interim Report

    ERIC Educational Resources Information Center

    Knestis, Kirk; Smoke-Zur, Naomi; Higgins, Cathy

    2010-01-01

    The Title II-D grant program, "Enhancing Education Through Technology," (EETT) provides financial assistance to higher poverty school districts that have the greatest need for technology support or have been identified as being in need of improvement. In 2009, the American Reinvestment and Recovery Act (ARRA) provided an additional $650…

  18. Assessment of Program Impact Through First Grade, Volume V: Impact on Children. An Evaluation of Project Developmental Continuity. Interim Report X.

    ERIC Educational Resources Information Center

    Berrueta-Clement, John; And Others

    Fifth in a series of six volumes reporting outcomes of the preliminary evaluation of an educational intervention, this report presents the findings of the effects of Project Developmental Continuity (PDC) up to the time the evaluation study's cohort of children completed grade 1. Preliminary findings concerning the relationship between variables…

  19. 76 FR 19909 - International Terrorism Victim Expense Reimbursement Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-11

    ... 1121-AA78 International Terrorism Victim Expense Reimbursement Program AGENCY: Office of Justice... promulgating this interim-final rule for its International Terrorism Victim Expense Reimbursement Program... international terrorism. DATES: Effective date: This interim-final rule is effective April 11, 2011. Comment...

  20. Experimental use of geogrids as an alternative to gravel placement : interim report - second year, August 2002.

    DOT National Transportation Integrated Search

    2002-08-01

    With the ongoing demand for improved infrastructure, the Maine Department of Transportation (MDOT) : continues to identify and evaluate new and innovative construction methods and materials. The : Departments Capital Highway Improvement Program (C...

  1. Experimental use of geogrids as an alternative to gravel placement : interim report - third year, July 2004.

    DOT National Transportation Integrated Search

    2004-07-01

    With the ongoing demand for improved infrastructure, the Maine Department of Transportation (MDOT) : continues to identify and evaluate new and innovative construction methods and materials. The : Departments Capital Highway Improvement Program (C...

  2. 76 FR 12926 - Clean Air Act Proposed Interim Approval of Title V Operating Permits Program; Southern Ute Indian...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... Proposed Interim Approval of Title V Operating Permits Program; Southern Ute Indian Tribe AGENCY... Title V Operating Permits Program submitted by the Southern Ute Indian Tribe (Tribe). The Tribe's Title V Operating Permit Program (Title V Program) was submitted for the purpose of administering a tribal...

  3. 76 FR 72623 - Literacy Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ... INFORMATION: This document finalizes the Bureau's Literacy Program regulations, published as an interim rule... DEPARTMENT OF JUSTICE Bureau of Prisons 28 CFR Part 544 [BOP-1036-F] RIN 1120-AA33 Literacy... Bureau's Literacy Program regulations, published as an interim rule on September 26, 1997 (62 FR 50791...

  4. Performance and economic evaluation of the seahorse natural gas hot water heater conversion at Fort Stewart. Interim report, 1994 Summer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Winiarski, D.W.

    1995-01-01

    The federal government is the largest single energy consumer in the United States cost valued at nearly $10 billion annually. The US Department of Energy`s (DOE) Federal Energy Management Program (FEMP) supports efforts to reduce energy use and associated expenses in the federal sector. One such effort, the New Technology Demonstration Program (NTDP), seeks to evaluate new energy-saving US technologies and secure their more timely adoption by the US government. Pacific Northwest Laboratory (PNL) is one of four DOE laboratories that participate in the New Technologies Demonstration Program, providing technical expertise and equipment to evaluate new, energy-saving technologies being studiedmore » under that program. This interim report provides the results of a field evaluation that PNL conducted for DOE/FEMP and the US Department of Defense (DoD) Strategic Environmental Research and Development Program (SERDP) to examine the performance of a candidate energy-saving technology-a hot water heater conversion system to convert electrically heated hot water tanks to natural gas fuel. The unit was installed at a single residence at Fort Stewart, a US Army base in Georgia, and the performance was monitored under the NTDP. Participating in this effort under a Cooperative Research and Development Agreement (CRADA) were Gas Fired Products, developers of the technology; the Public Service Company of North Carolina; Atlanta Gas Light Company; the Army Corps of Engineers; Fort Stewart; and Pacific Northwest Laboratory.« less

  5. Multiple Alternatives for Educational Evaluation and Decision-Making. Interim Draft. Paper and Report Series No. 72.

    ERIC Educational Resources Information Center

    Wholeben, Brent E.

    This volume is an exposition of a mathematical modeling technique for use in the evaluation and solution of complex educational problems at all levels. It explores in detail the application of simple algebraic techniques to such issues as program reduction, fiscal rollbacks, and computer curriculum planning. Part I ("Introduction to the…

  6. Institute for Developmental Studies Interim Progress Report. Part II: Research and Evaluation.

    ERIC Educational Resources Information Center

    Deutsch, Martin; And Others

    The Institute for Developmental Studies (IDS) is engaged in research aimed at specifying what the academic handicaps of deprived children are, what causes these handicaps, and what can be done to overcome them. This IDS report on their research and evaluation program is divided into two sections. The first, "Summaries of Basic Research, Applied…

  7. Summary report, Flexible VSR`s and VSR channel sleeve development programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kempf, F.J.

    1963-11-15

    (VSR = vertical safety rod.) This report summarizes results of development programs which have evaluated vertical rod channel sleeving materials and provided flexible vertical rods, acceptable for both interim use before rod channel sleeving, and for subsequent use in sleeved channels. B{sub 4}C is the rod material; graphite and Al oxide are among the sleeve materials.

  8. Some Contributions of General Systems Theory, Cybernetics Theory and Management Control Theory to Evaluation Theory and Practice. Research on Evaluation Program Paper and Report Series. Interim Draft.

    ERIC Educational Resources Information Center

    Cook, Desmond L.

    This document, one of a series of reports examining the possible contribution of other disciplines to evaluation methodology, describes the major elements of general systems theory (GST), cybernetics theory (CT) and management control theory (MCT). The author suggests that MCT encapsulates major concerns of evaluation since it reveals that…

  9. Assessment of Program Impact Through First Grade, Volume IV: Impact on Teachers. An Evaluation of Project Developmental Continuity. Interim Report X.

    ERIC Educational Resources Information Center

    Wacker, Sally; And Others

    The fourth in a series reporting evaluation findings on the impact of Project Developmental Continuity (PDC), this volume reports treatment-related and other findings concerning teachers and classrooms up to the time the evaluation study's cohort of children had completed grade 1. Begun at 15 sites in 1974 with the purpose of ensuring that…

  10. Diversified Satellite Occupations Program. Interim Report.

    ERIC Educational Resources Information Center

    Call, John Reed

    This interim report, covering the period of September 1970 to June 1971, describes a program conducted for elementary, junior high, and senior high grades. The elementary program was designed to help students develop an understanding of occupational competence. The prevention of dropouts and individualizing instruction were concerns of the junior…

  11. 75 FR 63655 - Countermeasures Injury Compensation Program (CICP): Administrative Implementation, Interim Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... Administration (HRSA), HHS. ACTION: Interim final rule with request for comments. SUMMARY: The Public Readiness and Emergency Preparedness Act (PREP Act) authorizes the Secretary of Health and Human Services (the Secretary) to establish the Countermeasures Injury Compensation Program (CICP or Program). The Department of...

  12. Federal Employees Health Benefits Program and Federal Employees Dental and Vision Insurance Program: eligibility for Pathway Programs participants. Interim final rule with request for comments.

    PubMed

    2014-01-06

    The U.S. Office of Personnel Management (OPM) is issuing an interim final regulation to update the Federal Employees Health Benefits Program (FEHBP) and the Federal Employees Dental and Vision Insurance Program (FEDVIP) regulations to reflect updated election opportunities for participants in the Pathways Programs. The Pathways Programs were created by Executive Order (E.O.) 13562, signed by the President on December 27, 2010, and are designed to enable the Federal Government to compete effectively for students and recent graduates by improving its recruitment efforts through internships and similar programs with Federal agencies. This interim final rule furthers these recruitment and retention efforts by providing health insurance, as well as dental and vision benefits, to eligible program participants and their families.

  13. Diesel Emission Control -- Sulfur Effects (DECSE) Program; Phase I Interim Data Report No. 2: NO{sub x} Adsorber Catalysts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DOE; ORNL; NREL

    1999-10-15

    The Diesel Emission Control-Sulfur Effects (DECSE) is a joint government/industry program to determine the impact of diesel fuel sulfur levels on emission control systems whose use could lower emissions of nitrogen oxides (NOx) and particulate matter (PM) from on-highway trucks in the 2002--2004 model years. Phase 1 of the program was developed with the following objectives in mind: (1) evaluate the effects of varying the level of sulfur content in the fuel on the emission reduction performance of four emission control technologies; and (2) measure and compare the effects of up to 250 hours of aging on selected devices formore » multiple levels of fuel sulfur content. This interim report discusses the results of the DECSE test program that demonstrates the potential of NOx adsorber catalyst technology across the range of diesel engine operation with a fuel economy penalty less than 4%.« less

  14. 76 FR 17159 - Office of New Reactors; Final Interim Staff Guidance on Standard Review Plan, Section 17.4...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-28

    ... Interim Staff Guidance on Standard Review Plan, Section 17.4, ``Reliability Assurance Program'' AGENCY... design reliability assurance program (RAP). This ISG updates the guidance provided to the staff in Standard Review Plan (SRP), Section 17.4, ``Reliability Assurance Program,'' of NUREG-0800, ``Standard...

  15. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  16. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  17. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  18. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  19. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  20. Civilian Health and Medical Program of the Uniformed Services (CHAMPUS); TRICARE Reserve Select for certain members of the selected reserve; Transitional Assistance Management Program; early eligibility for TRICARE for certain reserve component members. Interim final rule with comment period.

    PubMed

    2005-03-16

    This interim final rule establishes requirements and procedures for implementation of TRICARE Reserve Select. It also revises requirements and procedures for the Transitional Assistance Management Program. In addition, it establishes requirements and procedures for implementation of the earlier TRICARE eligibility for certain reserve component members. The rule is being published as an interim final rule with comment period in order to comply with statutory effective dates.

  1. Assessment of Program Impact Through First Grade, Volume VI: Summary of Impact on Institutions, Teachers and Classrooms, Parents and Children. An Evaluation of Project Developmental Continuity. Interim Report X.

    ERIC Educational Resources Information Center

    Powell, Marjorie; And Others

    The final volume in a series of six evaluation reports, this document provides a summary of the results of the evaluation of Project Developmental Continuity (PDC), conducted when the evaluation study's cohort of children had completed grade 1. Begun at 15 sites in 1974 with the purpose of ensuring that disadvantaged children receive continuous…

  2. A STUDY OF THE EFFECTS OF EXPERIMENTAL PROGRAMS ON PUPIL ACHIEVEMENT OBSERVED DURING FIRST THREE YEARS OF THE PROJECT, SECONDARY MATHEMATICS EVALUATION PROJECT. INTERIM REPORT.

    ERIC Educational Resources Information Center

    ERICKSEN, GERALD L.; RYAN, JAMES J.

    A REPORT IS GIVEN OF THE FIRST 3 YEARS OF A FIELD STUDY CONDUCTED TO DETERMINE THE EFFECTIVENESS OF SEVERAL PROTOTYPE, SECONDARY MATHEMATICS PROGRAMS THAT WERE PRODUCED BY DIFFERENT CURRICULUM DEVELOPMENT GROUPS. MATHEMATICS TEACHERS WHO HAD NO PREVIOUS EXPERIENCE WITH "MODERN" OR EXPERIMENTAL APPROACHES TO MATHEMATICS TAUGHT A SELECTED…

  3. Intervening in the Professional Development of Science Teachers: The Colorado Science Teaching Enhancement Program. Interim Report of the Formative Evaluation of CO-STEP.

    ERIC Educational Resources Information Center

    Ellis, James D.; Maxwell, Donald E.

    The purposes of the Colorado Science Teaching Enhancement Program (CO-STEP) are to improve the background in science content and the instructional skills of teachers in grades four through six throughout Colorado and to support the implementation of effective instruction. A network of six Teacher Development Centers in Colorado coordinate teacher…

  4. Interim Evaluation of the Pilot Program of the Truancy Case Management Partnership Intervention in the District of Columbia

    ERIC Educational Resources Information Center

    Liberman, Akiva; Cahill, Meagan; Cramer, Lindsey

    2012-01-01

    The Case Management Partnership Initiative (CMPI) addresses chronic truancy by linking truant ninth graders and their families to social services and case management, along with regular interagency case management meetings. A pilot was conducted at Anacostia and Ballou High Schools in 2011-2012. The implementation evaluation found that the pilot…

  5. Evaluation of New Texas Charter Schools: Second Interim Report (2007-10). Executive Summary

    ERIC Educational Resources Information Center

    Maloney, Catherine; Sheehan, Daniel; Rainey, Katharine

    2011-01-01

    The Texas Education Agency (TEA) was awarded Charter School Program (CSP) funding in 2007, and specified that the required evaluation would focus on the experiences and outcomes of new charter schools authorized to begin serving students across 4 school years: 2006-07, 2007-08, 2008-09, and 2009-10. TEA categorizes charter schools in terms of…

  6. The role and meaning of interim housing in housing first programs for people experiencing homelessness and mental illness.

    PubMed

    Zerger, Suzanne; Francombe Pridham, Katherine; Jeyaratnam, Jeyagobi; Connelly, Jolynn; Hwang, Stephen; O'Campo, Patricia; Stergiopoulos, Vicky

    2014-07-01

    The housing first (HF) model for individuals experiencing homelessness and mental illness differs by design from traditional models that require consumers to achieve "housing readiness" by meeting program or treatment prerequisites in transitional housing settings prior to permanent housing placement. Given a growing body of evidence for its favorable outcomes and cost effectiveness, HF is increasingly seen as an alternative to and argument against these traditional programs. As such, it is important that the elements and implementation challenges of the HF model be clearly understood and articulated. This qualitative study explored a largely unexamined aspect of the HF model-the need for and meaning of temporary residential settings (interim housing), a place to stay while waiting to secure permanent housing-using interviews and focus groups with service providers and consumers who experienced interim housing during implementation of HF in a large urban center. Although interim housing may not be necessary for all programs implementing the model, our study revealed numerous reasons and demands for safe, flexible interim housing options, and illustrated how they influence the effectiveness of consumer recovery, continuous service engagement, and housing stability.

  7. Interim report to the U.S. Congress on the Nonmotorized Transportation Pilot Program, SAFETEA-LU Section 1807

    DOT National Transportation Integrated Search

    2007-11-01

    This interim report to Congress summarizes the progress and initial results of the Federal Highway Administrations (FHWA) and the four pilot communities participation in the Nonmotorized Transportation Pilot Program (NTPP) from its inception th...

  8. Elder Abuse Demonstration Project. Third Interim Report to the Illinois General Assembly on Public Acts 83-1259 and 83-1432.

    ERIC Educational Resources Information Center

    Illinois State Dept. on Aging, Springfield.

    This document contains the third annual interim report of the Illinois Elder Abuse Demonstration Program. It discusses the overall intent of the demonstration program, trends and changes in the third year of the demonstration program compared with the results from the first two years of the program, and achievements and recommendations for a…

  9. 76 FR 60937 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-02; Aging Management Program for Steam...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ...-2011-02; Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-02, ``Aging Management Program for Steam... using Revision 3 of NEI 97-06 to manage steam generator aging. The Draft LR-ISG revises the NRC staff's...

  10. 77 FR 28765 - Homeless Emergency Assistance and Rapid Transition to Housing: Emergency Solutions Grants Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... program. The heading for this rule displayed a RIN number of 2506-AC29, which was incorrect. RIN number.... ACTION: Interim rule; correction. SUMMARY: The document advises that the interim rule for the Emergency Solutions Grants program, published on December 5, 2011, displayed an incorrect RIN number. This document...

  11. Interim results of long-term environmental exposures of advanced composites for aircraft applications

    NASA Technical Reports Server (NTRS)

    Pride, R. A.

    1978-01-01

    Interim results from a number of ongoing, long-term environmental effects programs for composite materials are reported. The flight service experience is evaluated for 142 composite aircraft components after more than five years and one million successful component flight hours. Ground-based outdoor exposures of composite material coupons after 3 years of exposure at five sites have reached equilibrium levels of moisture pickup which are predictable. Solar ultraviolet-induced material loss is discussed for these same exposures. No significant degradation has been observed in residual strength for either stressed or unstressed specimens, or for exposures to aviation fuels and fluids.

  12. 78 FR 70244 - Electronic Interim Assistance Reimbursement Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2011-0104] RIN 0960-AH45 Electronic Interim Assistance Reimbursement Program AGENCY: Social Security Administration. ACTION: Notice of.... We strongly urge you not to include in your comments any personal information, such as Social...

  13. The feasibility of using computer graphics in environmental evaluations : interim report, documenting historic site locations using computer graphics.

    DOT National Transportation Integrated Search

    1981-01-01

    This report describes a method for locating historic site information using a computer graphics program. If adopted for use by the Virginia Department of Highways and Transportation, this method should significantly reduce the time now required to de...

  14. 78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0140] Draft Spent Fuel Storage and Transportation Interim... Spent Fuel Storage and Transportation Interim Staff Guidance No. 24 (SFST-ISG-24), Revision 0, ``The Use of a Demonstration Program as Confirmation of Integrity for Continued Storage of High Burnup Fuel...

  15. EPA Interim Evaluation of 2016-2017 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2016-2017 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2016-2017 milestones, recognizing the achievements made in 2016.

  16. EPA Interim Evaluation of 2012-2013 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2012-2013 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2012-2013 milestones, recognizing the achievements made in 2012.

  17. EPA Interim Evaluation of 2014-2015 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2014-2015 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2014-2015 milestones, recognizing the achievements made in 2014.

  18. California Programs To Prevent and Reduce Drug, Alcohol, and Tobacco Use among In-School Youth: An Interim Report about Tobacco Use. Report No. 2.

    ERIC Educational Resources Information Center

    Southwest Regional Lab., Los Alamitos, CA.

    This document presents an interim report about tobacco use and its prevention among students in California schools. It focuses on the efforts of the Tobacco Use Prevention Education (TUPE) program, a part of the California Department of Education's Drug, Alcohol, and Tobacco Education (DATE) program. It is noted that TUPE programs have operated in…

  19. Assessment of Program Impact Through First Grade, Volume I: The Context, Conceptual Approach and Methods of the Evaluation. An Evaluation of Project Developmental Continuity. Interim Report X.

    ERIC Educational Resources Information Center

    Rosario, Jose; And Others

    This volume is the first of a series reporting evaluation findings on the impact of Project Developmental Continuity (PDC) on institutions, classroom staff, parents and children from the time the children entered Head Start through the first grade. PDC was begun in 1974 with the purpose of ensuring that disadvantaged children receive continuous…

  20. 78 FR 67442 - Congestion Mitigation and Air Quality Improvement Program Interim Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... the CMAQ Program as a result of the enactment of the Moving Ahead for Progress in the 21st Century Act (MAP-21). The Interim Guidance also contains changes to clarify the 2008 CMAQ Program Guidance. Because... Act for the 21st Century (TEA-21) (Pub. L. 105-178; Oct. 1998) and the Safe, Accountable, Flexible...

  1. 42 CFR 110.83 - Payment of all benefits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Secretary determines the mechanism of payment of Program benefits. She may choose to pay any benefits under... Secretary has the discretion to make interim payments of benefits under this Program, even before a final... only in exceptional cases. The Secretary may, for example, make an interim payment of medical benefits...

  2. School Health Program. Interim Guide. Grade 9.

    ERIC Educational Resources Information Center

    Northwest Territories Dept. of Education, Yellowknife.

    This interim guide, a component of the Northwest Territories (Canada) School Health Program, includes instructional strategies, lesson plans, reproducibles, and teacher background materials for ninth grade classes. The material is organized around the three curriculum units: (1) the mental and emotional well-being unit which has three lessons on…

  3. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  4. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  5. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  6. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  7. 76 FR 15028 - Airport Improvement Program (AIP): Interim Policy Regarding Access to Airports From Residential...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... resolution. The goal of the interim policy is to strike a careful balance by accommodating residential... will allow the agency to complete a separate, ongoing general aviation airport study that is analyzing the federally assisted general aviation airport system. The interim policy adopts the changes proposed...

  8. 77 FR 15818 - License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-16

    ...-05: Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Interim... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-05, ``Ongoing Review of Operating Experience... industry-wide operating experience as an attribute of aging management programs used at nuclear power...

  9. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  10. The atmospheric effects of stratospheric aircraft: A fourth program report

    NASA Technical Reports Server (NTRS)

    Stolarski, Richard S. (Editor); Wesoky, Howard L. (Editor); Wofsy, Steven C.; Ravishankara, A. R.; Rodriguez, Jose M.; Grose, William L.

    1995-01-01

    This document presents the fourth report from the Atmospheric Effects of Stratospheric Aircraft (AESA) component of NASA's High-Speed Research Program (HSRP). Market and technology considerations continue to provide an impetus for high-speed civil transport research. A recent AESA interim assessment report and a review of that report have shown that considerable uncertainty still exists about the possible impact of aircraft on the atmosphere. The AESA has been designed to develop the body of scientific knowledge necessary for the evaluation of the impact of stratospheric aircraft on the atmosphere. The first Program report presented the basic objectives and plans for AESA. This fourth report comes after the interim assessment and sets forth directions for the 1995 assessment at the end of AESA Phase 1. It also sets forth the goals and directions for AESA Phase 2, as reported at the 1994 Atmospheric Effects of Aviation Project (AEAP) annual meeting held in June. The focus of the Phase 2 effort is to obtain the best possible closure on the outstanding problems identified in the interim assessment and NASA/NRC review. Topics discussed in this report include how high-speed civil transports (HSCT) might affect stratospheric ozone, emissions scenarios and databases to assess potential atmospheric effects from HSCT's, calculated results from 2-D zonal mean models using emissions data, engine trace constituent measurements.

  11. 76 FR 21109 - Rural Energy for America Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-14

    ...The Rural Business-Cooperative Service (Agency) is establishing an interim rule for the Rural Energy for America Program (REAP), which is authorized under the Food, Conservation, and Energy Act of 2008. This interim rule modifies the existing grant and guaranteed loan program for renewable energy systems and energy efficiency improvements. In addition, it adds a grant program for feasibility studies for renewable energy systems and a grant program for energy audits and renewable energy development assistance, as provided in the Food, Conservation, and Energy Act of 2008.

  12. Evaluation of the HOPE Act: New State Services for Street Youth. Interim Report.

    ERIC Educational Resources Information Center

    McLain, Barbara

    This report reviews the effectiveness of Washington's HOPE Centers and Responsible Living Skills Programs (RLSPs) and reports findings and recommendations. In 1999, state legislators enacted the HOPE Act, which created these two services. HOPE Centers are temporary residential facilities where street youth can stay for 30 days while being…

  13. INTERIM REPORT ON THE EVOLUTION AND PERFORMANCE OF THE EICHROM TECHNOLOGIES PROCEPT RAPID DIOXIN ASSAY FOR SOIL AND SEDIMENT SAMPLES

    EPA Science Inventory

    A demonstration of screening technologies for determining the presence of dioxin and dioxin-like compounds in soil and sediment was conducted under the U.S. Environmental Protection Agency's(EPA's) Superfund Innovative Technology Evaluation Program in Saginaw, Michigan in 2004. T...

  14. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.1330 Section... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance with...

  15. TECNOB Study: Ad Interim Results of a Randomized Controlled Trial of a Multidisciplinary Telecare Intervention for Obese Patients with Type-2 Diabetes.

    PubMed

    Castelnuovo, Gianluca; Manzoni, Gian Mauro; Cuzziol, Paola; Cesa, Gian Luca; Corti, Stefania; Tuzzi, Cristina; Villa, Valentina; Liuzzi, Antonio; Petroni, Maria Letizia; Molinari, Enrico

    2011-03-04

    Obesity increases the risk of many health complications such as hypertension, coronary heart disease and type 2 diabetes, needs long-lasting treatment for effective results and involves high public and private care-costs. Therefore, it is imperative that enduring and low-cost clinical programs for obesity and related co-morbidities are developed and evaluated. Information and communication technologies (ICT) can help clinicians to deliver treatment in a cost-effective and time-saving manner to a large number of obese individuals with co-morbidities. To examine ad interim effectiveness of a 12-month multidisciplinary telecare intervention for weight loss provided to obese patients with type 2 diabetes. A single-center randomized controlled trial (TECNOB study) started in December 2008. At present, 72 obese patients with type 2 diabetes have been recruited and randomly allocated to the TECNOB program (n=37) or to a control condition (n=39). However, only 34 participants have completed at least the 3-month follow-up and have been included in this ad interim analysis. 21 out of them have reached also the 6-month follow-up and 13 have achieved the end of the program. Study is still on-going. All participants attended 1-month inpatient intensive program that involved individualized medical care, diet therapy, physical training and brief psychological counseling. At discharge, participants allocated to the TECNOB program were instructed to use a weight-loss web-site, a web-based videoconference tool, a dietary software installed into their cellular phones and an electronic armband measuring daily steps and energy expenditure. Weight and disordered eating-related behaviors and cognitions (EDI-2) at entry to hospital, at discharge from hospital, at 3,6 and 12 months. Ad interim analysis of data from 34 participants showed no statistically significant difference between groups in weight change at any time-point. However, within-group analysis revealed significant reductions of initial weight at discharge from hospital, at 3 months, at 6 months but not at 12 months. Control group had higher scores in Interpersonal distrust at 12 months. This ad interim findings revealed that the effect of the inpatient treatment was high and probably overwhelmed the effect of the TECNOB intervention. Much statistical power and long-term follow-up may enhance the probability to detect the TECNOB effect over and above the great one exerted by the inpatient program.

  16. An Approach for Evaluating the Technical Quality of Interim Assessments

    ERIC Educational Resources Information Center

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  17. Modeling Parenting Programs as an Interim Service for Families Waiting for Children's Mental Health Treatment.

    PubMed

    Cunningham, Charles E; Rimas, Heather; Chen, Yvonne; Deal, Ken; McGrath, Patrick; Lingley-Pottie, Patricia; Reid, Graham J; Lipman, Ellen; Corkum, Penny

    2015-01-01

    Using a discrete choice conjoint experiment, we explored the design of parenting programs as an interim strategy for families waiting for children's mental health treatment. Latent class analysis yielded 4 segments with different design preferences. Simulations predicted the Fast-Paced Personal Contact segment, 22.1% of the sample, would prefer weekly therapist-led parenting groups. The Moderate-Paced Personal Contact segment (24.7%) preferred twice-monthly therapist-led parenting groups with twice-monthly lessons. The Moderate-Paced E-Contact segment (36.3%), preferred weekly to twice-monthly contacts, e-mail networking, and a program combining therapist-led sessions with the support of a computerized telephone e-coach. The Slow-Paced E-Contact segment (16.9%) preferred an approach combining monthly therapist-led sessions, e-coaching, and e-mail networking with other parents. Simulations predicted 45.3% of parents would utilize an option combining 5 therapist coaching calls with 5 e-coaching calls, a model that could reduce costs and extend the availability of interim services. Although 41.0% preferred weekly pacing, 58% were predicted to choose an interim parenting service conducted at a twice-monthly to monthly pace. The results of this study suggest that developing interim services reflecting parental preferences requires a choice of formats that includes parenting groups, telephone-coached distance programs, and e-coaching options conducted at a flexible pace.

  18. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...

  19. Office of Inspector General; Medicare and state health care programs: fraud and abuse; issuance of advisory opinions by the OIG. Final rule.

    PubMed

    2008-07-17

    OIG is adopting in final form, without change, an interim final rule published on March 26, 2008 (73 FR 15937). We received no comments to the interim final rule. The interim final rule revised the process for advisory opinion requestors to submit payments for advisory opinion costs.

  20. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...

  1. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...

  2. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...

  3. Accounting for interim safety monitoring of an adverse event upon termination of a clinical trial.

    PubMed

    Dallas, Michael J

    2008-01-01

    Upon termination of a clinical trial that uses interim evaluations to determine whether the trial can be stopped, a proper statistical analysis must account for the interim evaluations. For example, in a group-sequential design where the efficacy of a treatment regimen is evaluated at interim stages, and the opportunity to stop the trial based on positive efficacy findings exists, the terminal p-value, point estimate, and confidence limits of the outcome of interest must be adjusted to eliminate bias. While it is standard practice to adjust terminal statistical analyses due to opportunities to stop for "positive" findings, adjusting due to opportunities to stop for "negative" findings is also important. Stopping rules for negative findings are particularly useful when monitoring a specific rare serious adverse event in trials designed to show safety with respect to the event. In these settings, establishing conservative stopping rules are appropriate, and therefore accounting for the interim monitoring can have a substantial effect on the final results. Here I present a method to account for interim safety monitoring and illustrate its usefulness. The method is demonstrated to have advantages over methodology that does not account for interim monitoring.

  4. Research on the New Nursery School. Part I, A Summary of the Evaluation of the Experimental Program for Deprived Children at the New Nursery School Using Some Experimental Measures. Interim Report.

    ERIC Educational Resources Information Center

    Nimnicht, Glen; And Others

    The New Nursery School (NNS) program was set up to help 3- and 4-year-old, Spanish-surnamed, environmentally deprived children. The objectives set were (1) to improve self-image, (2) to increase perceptual acuity, (3) to improve language ability, and (4) to improve problem-solving and concept-formation skills. The school is organized as an…

  5. Registration Review Schedules

    EPA Pesticide Factsheets

    This schedule indicates plans for completion of risk assessments, proposed interim decisions and interim decisions for pesticides in the Registration Review program, EPA reviews all registered pesticides at least every 15 years as required by FIFRA.

  6. THE PROGRAM FOR BRAIN INJURED CHILDREN IN THE NEW YORK CITY PUBLIC SCHOOLS, AN APPRAISAL.

    ERIC Educational Resources Information Center

    MOSKOWITZ, SUE

    IN 1959, THE TWO EXISTING SPECIAL CLASSES FOR BRAIN INJURED CHILDREN IN NEW YORK CITY WERE EVALUATED BY OBSERVATIONS, EXAMINATION OF THE STUDENTS' MEDICAL AND EDUCATIONAL RECORDS, AND INTERVIEWS WITH TEACHERS, PSYCHOLOGISTS, PSYCHIATRISTS, AND SPEECH AND OTHER SPECIALISTS. RECOMMENDATIONS WERE MADE IN AN INTERIM REPORT. A LONGITUDINAL STUDY WAS…

  7. Linking the New York State NYSTP Assessments to NWEA MAP Tests

    ERIC Educational Resources Information Center

    Northwest Evaluation Association, 2016

    2016-01-01

    Northwest Evaluation Association™ (NWEA™) is committed to providing partners with useful tools to help make inferences from the Measures of Academic Progress® (MAP®) interim assessment scores. Recently, NWEA completed a concordance study to connect the scales of the New York State Testing Program (NYSTP) reading and math with those of the MAP…

  8. Evaluation of New Texas Charter Schools: Interim Report (2007-10). Executive Summary

    ERIC Educational Resources Information Center

    Maloney, Catherine; Sheehan, Daniel; Rainey, Katie

    2009-01-01

    As interest in expanding the number of high quality charter schools available to parents and students has grown, policy makers have increased their focus on identifying and providing support to new charter programs that have the potential to improve student outcomes and satisfy parent and student needs. Since 1994, the U.S. Department of Education…

  9. Evaluation of New Texas Charter Schools: Interim Report (2007-10)

    ERIC Educational Resources Information Center

    Maloney, Catherine; Sheehan, Daniel; Rainey, Katie

    2009-01-01

    As interest in expanding the number of high quality charter schools available to parents and students has grown, policy makers have increased their focus on identifying and providing support to new charter programs that have the potential to improve student outcomes and satisfy parent and student needs. Since 1994, the U.S. Department of Education…

  10. An Evaluation of ESEA Title III Projects, Fiscal Year 1972. Interim Report.

    ERIC Educational Resources Information Center

    Wilson, Jerusa; And Others

    This report contains descriptions and progress of five projects in the District of Columbia partially or wholly funded by ESEA Title III: (1) The Columbia Road Preschool Pilot Project, a second-year experimental effort designed to serve as a model school providing an experimental setting for early childhood educational programs; (2) The Montessori…

  11. Multiple Alternatives Modeling in Determining Fiscal Roll-Backs during Educational Funding Crises. Interim Draft. Paper and Report Series No. 70.

    ERIC Educational Resources Information Center

    Wholeben, Brent E.; Sullivan, John M.

    This report provides an extensive discussion of the use of criterion referenced, mathematical modeling procedures to determine which budget reductions minimize reduction in the quality of educational programs. Part I, "Evaluation of Potential Budgeting Roll-backs under Educational Fiscal Crisis," explains the basic design of multiple…

  12. 75 FR 57937 - Energy Conservation Program for Consumer Products: Notice of Petition for Waiver of Samsung...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ... determining the energy consumption of clothes washers. Today's notice also grants an interim waiver of the... evaluate the basic model in a manner so unrepresentative of its true energy consumption characteristics as... manner representative of its energy consumption. 10 CFR 430.27(b)(1)(iii). The Assistant Secretary may...

  13. 75 FR 47444 - Amendments to the Informal and Other Procedures, Rules of Organization and Program Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... Practice; Interim Commission Review of Public Company Accounting Oversight Board Inspection Reports and... facilitate interim Commission review of Public Company Accounting Oversight Board [[Page 47445

  14. Civilian Health and Medical Program of the Uniformed Services (CHAMPUS); TRICARE Retired Reserve for members of the Retired Reserve. Interim final rule with comment period.

    PubMed

    2010-08-06

    This interim final rule establishes requirements and procedures for implementation of TRICARE Retired Reserve. This interim final rule addresses provisions of the National Defense Authorization Act for Fiscal Year 2010 (NDAA-10). The purpose of this interim final rule is to establish the TRICARE Retired Reserve program that implements section 705 of the NDAA-10. Section 705 allows members of the Retired Reserve who are qualified for non-regular retirement, but are not yet 60 years of age, to qualify to purchase medical coverage equivalent to the TRICARE Standard (and Extra) benefit unless that member is either enrolled in, or is eligible to enroll in, a health benefit plan under Chapter 89 of Title 5, United States Code, as well as certain survivors. The amount of the premium that qualified members pay to purchase these benefits will represent the full cost as determined on an appropriate actuarial basis for coverage under the TRICARE Standard (and Extra) benefit including the cost of the program administration. There will be one premium for member-only coverage and a separate premium for member and family coverage. The rules and procedures otherwise outlined in Part 199 of 32 CFR relating to the operation and administration of the TRICARE Standard and Extra programs including the required cost-shares, deductibles and catastrophic caps for retired members and their dependents will apply to this program. The rule is being published as an interim final rule with comment period in order to comply with statutory effective dates.

  15. A Compensatory Educational Program on the Higher Education Level for a Culturally Deprived Group in Israel. An Interim Report, February 1968.

    ERIC Educational Resources Information Center

    Perlberg, Arye; Rom, Yael

    This resume of an interim report discusses a university preparatory program for Israeli soldiers of Islamic (Sephardic) origin. The Israeli Defense Forces identify and select the candidates, who must be of Sephardic, low socioeconomic status background and have certificates from academic or vocational high schools. The chosen students are soldiers…

  16. 76 FR 18324 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-51; Small Entity Compliance Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... (202) 501-4755. List of Rules in FAC 2005-51 Item Subject FAR case Analyst *I Women-Owned Small 2010...--Women-Owned Small Business (WOSB) Program (FAR Case 2010-015) (Interim) This interim rule amends the FAR to add subpart 19.15, Women-Owned Small Business Program, which will assist Federal agencies in...

  17. Kids Identifying and Defeating Stroke (KIDS): Development and Implementation of a Multi-Ethnic Health Education Intervention to Increase Stroke Awareness Among Middle School Students and Their Parents

    PubMed Central

    Conley, Kathleen M; Majersik, Jennifer; Gonzales, Nicole R; Maddox, Katherine E; Pary, Jennifer K; Brown, Devin L; Moyé, Lemuel A; Espinosa, Nina; Grotta, James C; Morgenstern, Lewis B

    2009-01-01

    The KIDS (Kids Identifying and Defeating Stroke) Program is a three-year prospective, randomized, controlled, multiethnic school-based intervention study. Program goals include increasing knowledge of stroke signs and treatment and intention to immediately call 911 among Mexican American (MA) and non-Hispanic white (NHW) middle school students and their parents. This article describes the design, implementation and interim evaluation of this theory-based intervention. Intervention students received a culturally appropriate stroke education program divided into four 50-minute classes each year during the 6th, 7th, and 8th grades. Each class session also included a homework assignment that involved the students’ parents or other adult partners. Interim-test results indicate that this educational intervention was successful in improving students’ stroke symptom and treatment knowledge and intent to call 911 upon witnessing a stroke compared with controls (p<0.001). We conclude that this school-based educational intervention to reduce delay time to hospital arrival for stroke shows early promise. PMID:18332150

  18. Alaska Interim Land Cover Mapping Program; final report

    USGS Publications Warehouse

    Fitzpatrick-Lins, Katherine; Doughty, E.F.; Shasby, Mark; Benjamin, Susan

    1989-01-01

    In 1985, the U.S. Geological Survey initiated a research project to develop an interim land cover data base for Alaska as an alternative to the nationwide Land Use and Land Cover Mapping Program. The Alaska Interim Land Cover Mapping Program was subsequently created to develop methods for producing a series of land cover maps that utilized the existing Landsat digital land cover classifications produced by and for the major land management agencies for mapping the vegetation of Alaska. The program was successful in producing digital land cover classifications and statistical summaries using a common statewide classification and in reformatting these data to produce l:250,000-scale quadrangle-based maps directly from the Scitex laser plotter. A Federal and State agency review of these products found considerable user support for the maps. Presently the Geological Survey is committed to digital processing of six to eight quadrangles each year.

  19. 77 FR 31374 - Notice of Submission of Proposed Information Collection to OMB; Rural Housing Stability Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ... through the HEARTH Act. The statutory provisions and the implementing interim regulations that govern RHSP... HEARTH Act. The statutory provisions and the implementing interim regulations that govern RHSP require...

  20. The WFIRST Interim Design Reference Mission: Capabilities, Constraints, and Open Questions

    NASA Technical Reports Server (NTRS)

    Kruk, Jeffrey W.

    2012-01-01

    The Project Office and Science Definition Team for the Wide-Field Infrared Survey Telescope (WFIRST) are in the midst of a pre-Phase A study to establish a Design Reference Mission (DRM). An Interim report was released in June 2011, with a final report due later in 2012. The predicted performance of the Interim DRM Observatory will be described, including optical quality, observing efficiency, and sensitivity for representative observing scenarios. Observing constraints and other limitations on performance will also be presented, with an emphasis on potential Guest Observer programs. Finally, a brief status update will be provided on open trade studies of interest to the scientific community. The final DRM may differ from the Interim DRM presented here. However, the underlying requirements of the scientific programs are not expected to change, hence the capabilities of the IDRM are likely to be maintained even if the implementation changes in significant ways.

  1. A Process Evaluation of Project Developmental Continuity. Interim Report II, Part B: Recommendations for Measuring Program Impact.

    ERIC Educational Resources Information Center

    Love, John M.; And Others

    This report presents recommendations for measures to be used in assessing the impact of Project Developmental Continuity (PDC). Chapter I reviews the purpose of the impact study and presents the basic considerations guiding the selection of measures. Chapter II describes the review process that led to the final recommendations. Chapter III…

  2. Interim Reliability Evaluation Program: analysis of the Browns Ferry, Unit 1, nuclear plant. Main report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mays, S.E.; Poloski, J.P.; Sullivan, W.H.

    1982-07-01

    A probabilistic risk assessment (PRA) was made of the Browns Ferry, Unit 1, nuclear plant as part of the Nuclear Regulatory Commission's Interim Reliability Evaluation Program (IREP). Specific goals of the study were to identify the dominant contributors to core melt, develop a foundation for more extensive use of PRA methods, expand the cadre of experienced PRA practitioners, and apply procedures for extension of IREP analyses to other domestic light water reactors. Event tree and fault tree analyses were used to estimate the frequency of accident sequences initiated by transients and loss of coolant accidents. External events such as floods,more » fires, earthquakes, and sabotage were beyond the scope of this study and were, therefore, excluded. From these sequences, the dominant contributors to probable core melt frequency were chosen. Uncertainty and sensitivity analyses were performed on these sequences to better understand the limitations associated with the estimated sequence frequencies. Dominant sequences were grouped according to common containment failure modes and corresponding release categories on the basis of comparison with analyses of similar designs rather than on the basis of detailed plant-specific calculations.« less

  3. Autonomy Level Specification for Intelligent Autonomous Vehicles

    DTIC Science & Technology

    2003-09-01

    Autonomy Level Specification for Intelligent Autonomous Vehicles : Interim Progress Report Hui-Min Huang, Elena Messina, James Albus...Level Specification for Intelligent Autonomous Vehicles : Interim Progress Report 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6

  4. Disease management for chronically ill beneficiaries in traditional Medicare.

    PubMed

    Bott, David M; Kapp, Mary C; Johnson, Lorraine B; Magno, Linda M

    2009-01-01

    We summarize the Centers for Medicare and Medicaid Services' (CMS's) experience with disease management (DM) in fee-for-service Medicare. Since 1999, the CMS has conducted seven DM demonstrations involving some 300,000 beneficiaries in thirty-five programs. Programs include provider-based, third-party, and hybrid models. Reducing costs sufficient to cover program fees has proved particularly challenging. Final evaluations on twenty programs found three with evidence of quality improvement at or near budget-neutrality, net of fees. Interim monitoring covering at least twenty-one months on the remaining fifteen programs suggests that four are close to covering their fees. Characteristics of the traditional Medicare program present a challenge to these DM models.

  5. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  6. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  7. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  8. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  9. Power processing methodology. [computerized design of spacecraft electric power systems

    NASA Technical Reports Server (NTRS)

    Fegley, K. A.; Hansen, I. G.; Hayden, J. H.

    1974-01-01

    Discussion of the interim results of a program to investigate the feasibility of formulating a methodology for the modeling and analysis of aerospace electrical power processing systems. The object of the total program is to develop a flexible engineering tool which will allow the power processor designer to effectively and rapidly assess and analyze the tradeoffs available by providing, in one comprehensive program, a mathematical model, an analysis of expected performance, simulation, and a comparative evaluation with alternative designs. This requires an understanding of electrical power source characteristics and the effects of load control, protection, and total system interaction.

  10. A randomized controlled trial of interim methadone maintenance.

    PubMed

    Schwartz, Robert P; Highfield, David A; Jaffe, Jerome H; Brady, Joseph V; Butler, Carol B; Rouse, Charles O; Callaman, Jason M; O'Grady, Kevin E; Battjes, Robert J

    2006-01-01

    Effective alternatives to long waiting lists for entry into methadone hydrochloride maintenance treatment are needed to reduce the complications of continuing heroin dependence and to increase methadone treatment entry. To compare the effectiveness of interim methadone maintenance with that of the usual waiting list condition in facilitating methadone treatment entry and reducing heroin and cocaine use and criminal behavior. Randomized, controlled, clinical trial using 2 conditions, with treatment assignment on a 3:2 basis to interim maintenance-waiting list control. A methadone treatment program in Baltimore. A total of 319 individuals meeting the criteria for current heroin dependence and methadone maintenance treatment. Participants were randomly assigned to either interim methadone maintenance, consisting of an individually determined methadone dose and emergency counseling only for up to 120 days, or referral to community-based methadone treatment programs. Entry into comprehensive methadone maintenance therapy at 4 months from baseline; self-reported days of heroin use, cocaine use, and criminal behavior; and number of urine drug test results positive for heroin and cocaine at the follow-up interview conducted at time of entry into comprehensive methadone treatment (or at 4 months from baseline for participants who did not enter regular treatment). Significantly more participants assigned to the interim methadone maintenance condition entered comprehensive methadone maintenance treatment by the 120th day from baseline (75.9%) than those assigned to the waiting list control condition (20.8%) (P<.001). Overall, in the past 30 days at follow-up, interim participants reported significantly fewer days of heroin use (P<.001), had a significant reduction in heroin-positive drug test results (P<.001), reported spending less money on drugs (P<.001), and received less illegal income (P<.02) than the waiting list participants. Interim methadone maintenance results in a substantial increase in the likelihood of entry into comprehensive treatment, and is an effective means of reducing heroin use and criminal behavior among opioid-dependent individuals awaiting entry into a comprehensive methadone treatment program.

  11. 76 FR 38913 - World Trade Center Health Program Requirements for Enrollment, Appeals, Certification of Health...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ...Title I of the James Zadroga Health and Compensation Act of 2010 amended the Public Health Service Act (PHS Act) by adding Title XXXIII, which establishes the World Trade Center (WTC) Health Program. Sections 3311, 3312, and 3321 of Title XXXIII of the PHS Act require that the WTC Program Administrator develop regulations to implement portions of the WTC Health Program established within the Department of Health and Human Services (HHS). The WTC Health Program, which will be administered in part by the Director of the National Institute for Occupational Safety and Health (NIOSH), within the Centers for Disease Control and Prevention (CDC), will provide medical monitoring and treatment to eligible firefighters and related personnel, law enforcement officers, and rescue, recovery and cleanup workers who responded to the September 11, 2001, terrorist attacks in New York City, Shanksville, PA, and at the Pentagon, and to eligible survivors of the New York City attacks. This interim final rule establishes the processes by which eligible responders and survivors may apply for enrollment in the WTC Health Program, obtain health monitoring and treatment for WTC-related health conditions, and appeal enrollment and treatment decisions. This interim final rule also establishes a process for the certification of health conditions, and reimbursement rates for providers who provide initial health evaluations, treatment, and health monitoring.

  12. Indiana application for interim authorization, phase I, hazardous waste management program--Environmental Protection Agency. Notice of public hearing and public comment period.

    PubMed

    1982-04-12

    EPA regulations to protect human health and the environment from the improper management of hazardous waste were published in the Federal Register on May 19, 1980 (45 FR 33063). These regulations include provisions for authorization of State programs to operate in lieu of the Federal program. Today EPA is announcing the availability for public review of the Indiana application for Phase I Interim Authorization, inviting public comment, and giving notice of a public hearing to be held on the application.

  13. Patient Protection and Affordable Care Act; third party payment of qualified health plan premiums. Interim final rule with comment period.

    PubMed

    2014-03-19

    This interim final rule requires issuers of qualified health plans (QHPs), including stand-alone dental plans (SADPs), to accept premium and cost-sharing payments made on behalf of enrollees by the Ryan White HIV/AIDS Program, other Federal and State government programs that provide premium and cost sharing support for specific individuals, and Indian tribes, tribal organizations, and urban Indian organizations.

  14. Performance and life evaluation of advanced battery technologies for electric vehicle applications

    NASA Astrophysics Data System (ADS)

    Deluca, W. H.; Gillie, K. R.; Kulaga, J. E.; Smaga, J. A.; Tummillo, A. F.; Webster, C. E.

    Advanced battery technology evaluations are performed under simulated electric vehicle (EV) operating conditions at the Argonne Analysis and Diagnostic Laboratory (ADL). The ADL provides a common basis for both performance characterization and life evaluation with unbiased application of tests and analyses. This paper summarizes the performance characterizations and life evaluations conducted in 1990 on nine single cells and fifteen 3- to 360-cell modules that encompass six technologies: (Na/S, Zn/Br, Ni/Fe, Ni/Cd, Ni-metal hydride, and lead-acid). These evaluations were performed for the Department of Energy and Electric Power Research Institute. The results provide battery users, developers, and program managers an interim measure of the progress being made in battery R and D programs, a comparison of battery technologies, and a source of basic data for modelling and continuing R and D.

  15. Evaluation of experimental railroad-highway grade crossings in Louisiana : interim report No. 5.

    DOT National Transportation Integrated Search

    1980-04-01

    This interim report is prepared to provide a review of the performance evaluation exhibited on twenty-three (23) experimental railroad-highway grade-crossing projects in the state of Louisiana. The railroad crossings were installed during a ten-year ...

  16. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...

  17. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...

  18. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...

  19. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...

  20. 24 CFR 7.44 - Interim relief.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...

  1. Do Interim Assessments Reduce the Race and SES Achievement Gaps?

    ERIC Educational Resources Information Center

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie

    2017-01-01

    The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…

  2. Can Interim Assessments Be Used for Instructional Change? Policy Brief. RB-51

    ERIC Educational Resources Information Center

    Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew

    2009-01-01

    The purpose of this exploratory study was to examine the use of interim assessments and the policy supports that promote their use to change instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that: a) evaluate student knowledge and skills, typically within a…

  3. Maywood Interim Storage Site annual environmental report for calendar year 1991, Maywood, New Jersey. [Maywood Interim Storage Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1992-09-01

    This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includesmore » sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less

  4. German Support Program for Retrieval and Safe Storage of Disused Radioactive Sealed Sources in Ukraine - 13194

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pretzsch, Gunter; Salewski, Peter; Sogalla, Martin

    2013-07-01

    The German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU) on behalf of the Government of the Federal Republic of Germany supports the State Nuclear Regulatory Inspectorate of Ukraine (SNRIU) in enhancement of nuclear safety and radiation protection and strengthening of the physical protection. One of the main objectives of the agreement concluded by these parties in 2008 was the retrieval and safe interim storage of disused orphan high radioactive sealed sources in Ukraine. At present, the Ukrainian National Registry does not account all high active radiation sources but only for about 70 - 80 %. GRSmore » in charge of BMU to execute the program since 2008 concluded subcontracts with the waste management and interim storage facilities RADON at different regions in Ukraine as well with the waste management and interim storage facility IZOTOP at Kiev. Below selected examples of removal of high active Co-60 and Cs-137 sources from irradiation facilities at research institutes are described. By end of 2012 removal and safe interim storage of 12.000 disused radioactive sealed sources with a total activity of more than 5,7.10{sup 14} Bq was achieved within the frame of this program. The German support program will be continued up to the end of 2013 with the aim to remove and safely store almost all disused radioactive sealed sources in Ukraine. (authors)« less

  5. Evaluation of ERA-Interim precipitation data in complex terrain

    NASA Astrophysics Data System (ADS)

    Gao, Lu; Bernhardt, Matthias; Schulz, Karsten

    2013-04-01

    Precipitation controls a large variety of environmental processes, which is an essential input parameter for land surface models e.g. in hydrology, ecology and climatology. However, rain gauge networks provides the necessary information, are commonly sparse in complex terrains, especially in high mountainous regions. Reanalysis products (e.g. ERA-40 and NCEP-NCAR) as surrogate data are increasing applied in the past years. Although they are improving forward, previous studies showed that these products should be objectively evaluated due to their various uncertainties. In this study, we evaluated the precipitation data from ERA-Interim, which is a latest reanalysis product developed by ECMWF. ERA-Interim daily total precipitation are compared with high resolution gridded observation dataset (E-OBS) at 0.25°×0.25° grids for the period 1979-2010 over central Alps (45.5-48°N, 6.25-11.5°E). Wet or dry day is defined using different threshold values (0.5mm, 1mm, 5mm, 10mm and 20mm). The correspondence ratio (CR) is applied for frequency comparison, which is the ratio of days when precipitation occurs in both ERA-Interim and E-OBS dataset. The result shows that ERA-Interim captures precipitation occurrence very well with a range of CR from 0.80 to 0.97 for 0.5mm to 20mm thresholds. However, the bias of intensity increases with rising thresholds. Mean absolute error (MAE) varies between 4.5 mm day-1 and 9.5 mm day-1 in wet days for whole area. In term of mean annual cycle, ERA-Interim almost has the same standard deviation of the interannual variability of daily precipitation with E-OBS, 1.0 mm day-1. Significant wet biases happened in ERA-Interim throughout warm season (May to August) and dry biases in cold season (November to February). The spatial distribution of mean annual daily precipitation shows that ERA-Interim significant underestimates precipitation intensity in high mountains and northern flank of Alpine chain from November to March while pronounced overestimate in the southern flank of Alps. The poor topographical and flow related characteristic representation of ERA-Interim model is possibly responsible for the bias. Particularly, the mountain block effect of moisture is weak captured. The comparison demonstrates that ERA-Interim precipitation intensity needs bias correction for further alpine climate studies, although it reasonably captures precipitation frequency. This critical evaluation not only diagnosed the data quality of ERA-Interim, but also provided the evidence for reanalysis products downscaling and bias correction in complex terrain.

  6. Scenarios and performance measures for advanced ISDN satellite design and experiments

    NASA Technical Reports Server (NTRS)

    Pepin, Gerard R.

    1991-01-01

    Described here are the contemplated input and expected output for the Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) and Full Service ISDN Satellite (FSIS) Models. The discrete event simulations of these models are presented with specific scenarios that stress ISDN satellite parameters. Performance measure criteria are presented for evaluating the advanced ISDN communication satellite designs of the NASA Satellite Communications Research (SCAR) Program.

  7. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... interim measures necessary to ensure the protection of human health and the environment. Interim measures... supplies or sensitive ecosystems; (iv) Further degradation of the ground-water that may occur if remedial... situations that may pose threats to human health and the environment. (b) An owner or operator may determine...

  8. "Intelligent" Computer Assisted Instruction (CAI) Applications. Interim Report.

    ERIC Educational Resources Information Center

    Brown, John Seely; And Others

    Interim work is documented describing efforts to modify computer techniques used to recognize and process English language requests to an instructional simulator. The conversion from a hand-coded to a table driven technique are described in detail. Other modifications to a simulation based computer assisted instruction program to allow a gaming…

  9. 78 FR 41125 - Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ... Brachytherapy Medical Event Reporting AGENCY: Nuclear Regulatory Commission. ACTION: Policy statement; revision... medical events occurring under an NRC licensee's permanent implant brachytherapy program. This interim..., ``Adequacy of Medical Event Definitions in 10 CFR [Title 10 of the Code of Federal Regulations] 35.3045, and...

  10. MRM Evaluation Research Program

    NASA Technical Reports Server (NTRS)

    Taylor, James C.

    1998-01-01

    This is an interim report on the current output of the MRM evaluation research program. During 1998 this research program has used new and existing data to create an important tool for the development and improvement of "maintenance resource management" (MRM). Thousands of surveys completed by participants in airline MRM training and/or behavior change programs have, for the first time, been consolidated into a panel of "MRM Attitudes and Opinion Profiles." These profiles can be used to compare the attitudes about decision making and communication in any given company at any stage in its MRM program with attitudes of a large sample of like employees during a similar period in their MRM involvement. This panel of comparison profiles for attitudes and opinions is a tool to help audit the effectiveness of a maintenance human factors program. The profile panel is the first of several tools envisioned for applying the information accumulating in MRM databases produced as one of the program's long range objectives.

  11. Tribal child welfare. Interim final rule.

    PubMed

    2012-01-06

    The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program.

  12. Evaluation of wide edgelines on two-lane rural roads : interim report.

    DOT National Transportation Integrated Search

    1985-01-01

    This interim report presents the results of an evaluation of 4-in and 8-in wide edgellnes on the lateral placement and speeds of vehicles on two-lane rural roads. Data were collected at twelve locations on sections of roadway covering 55.2 ml. Two me...

  13. Cost Sensitivity Analysis for Consolidated Interim Storage of Spent Fuel: Evaluating the Effect of Economic Environment Parameters

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cumberland, Riley M.; Williams, Kent Alan; Jarrell, Joshua J.

    This report evaluates how the economic environment (i.e., discount rate, inflation rate, escalation rate) can impact previously estimated differences in lifecycle costs between an integrated waste management system with an interim storage facility (ISF) and a similar system without an ISF.

  14. Public School Finance Problems in Texas. An Interim Report.

    ERIC Educational Resources Information Center

    Texas Research League, Austin.

    The U.S. District Court ruling in Rodriguez vs San Antonio Independent School District, which struck down Texas' school finance system as inequitable and unconstitutional, provided the impetus for publishing this interim report. The report documents the growing cost of State-supported public school programs--the primary concern prior to the…

  15. Non-Formal Education for Rural Development: Strengthening Learning Opportunities for Children and Youth. Interim Report.

    ERIC Educational Resources Information Center

    United Nations Economic and Social Council, New York, NY.

    This interim report, commissioned by UNICEF, emphasizes the value of nonformal educational programs to educationally deprived rural children and youth in developing countries. The first set of basic findings and recommendations arising from this extensive international research study is presented. Organized into five chapters, the text includes…

  16. Interim Particulate Matter Test Method for the Determination of Particulate Matter from Gas Turbine Engines, SERDP Project WP-1538 Final Report

    EPA Science Inventory

    Under Project No. WP-1538 of the Strategic Environmental Research and Development Program, the U. S. Air Force's Arnold Engineering Development Center (AEDC) is developing an interim test method for non-volatile particulate matter (PM) specifically for the Joint Strike Fighter (J...

  17. System architecture for the Canadian interim mobile satellite system

    NASA Technical Reports Server (NTRS)

    Shariatmadar, M.; Gordon, K.; Skerry, B.; Eldamhougy, H.; Bossler, D.

    1988-01-01

    The system architecture for the Canadian Interim Mobile Satellite Service (IMSS) which is planned for commencement of commercial service in late 1989 is reviewed. The results of an associated field trial program which was carried out to determine the limits of coverage and the preliminary performance characteristics of the system are discussed.

  18. To Have and to Hold: Reflections of an Interim Director

    ERIC Educational Resources Information Center

    Hibl, Lisa M.

    2018-01-01

    Leading a long-established LLC as an Interim Director poses particular challenges and rewards. Uncertainties abound for the program and for the individual. Professionally speaking, taking on the hybrid role of faculty/ administrator can be both difficult and exciting. Ultimately, the solutions are in the details. Listening carefully to students,…

  19. Medicare and Medicaid programs; fire safety requirements for certain health care facilities; amendment. Interim final rule with comment period.

    PubMed

    2005-03-25

    This interim final rule with comment period adopts the substance of the April 15, 2004 temporary interim amendment (TIA) 00-1 (101), Alcohol Based Hand Rub Solutions, an amendment to the 2000 edition of the Life Safety Code, published by the National Fire Protection Association (NFPA). This amendment will allow certain health care facilities to place alcohol-based hand rub dispensers in egress corridors under specified conditions. This interim final rule with comment period also requires that nursing facilities install smoke detectors in resident rooms and public areas if they do not have a sprinkler system installed throughout the facility or a hard-wired smoke detection system in those areas.

  20. From Testing to Teaching: The Use of Interim Assessments in Classroom Instruction. CPRE Research Report # RR-65

    ERIC Educational Resources Information Center

    Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew

    2009-01-01

    The purpose of this exploratory study is to examine the use of interim assessments and the policy supports that promote use to improve instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that a) evaluate student knowledge and skills, typically within a limited…

  1. Receiver design, performance analysis, and evaluation for space-borne laser altimeters and space-to-space laser ranging systems

    NASA Technical Reports Server (NTRS)

    Davidson, Frederic M.; Sun, Xiaoli; Field, Christopher T.

    1994-01-01

    This interim report consists of two reports: 'Space Radiation Effects on Si APDs for GLAS' and 'Computer Simulation of Avalanche Photodiode and Preamplifier Output for Laser Altimeters.' The former contains a detailed description of our proton radiation test of Si APD's performed at the Brookhaven National Laboratory. The latter documents the computer program subroutines which were written for the upgrade of NASA's GLAS simulator.

  2. Hazelwood Interim Storage Site annual environmental report for calendar year 1991, Hazelwood, Missouri. [Hazelwood Interim Storage Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of themore » nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.« less

  3. An Inter-Disciplinary Problem Solving Approach to Environmental Education, Interim Evaluation Report.

    ERIC Educational Resources Information Center

    Egan, Thomas A.; Seidel, Janet C.

    Evaluation of an ESEA Title III project, "An Inter-Disciplinary Problem Solving Approach to Environmental Education" located in Berks County, Pennsylvania, is offered in this interim report. The report is primarily concerned with the degree to which operational and management process objectives are being achieved in each of four…

  4. Flammability, Offgassing, and Compatibility Requirements and Test Procedures. Interim NASA Technical Standard

    NASA Technical Reports Server (NTRS)

    2009-01-01

    This Interim Standard establishes requirements for evaluation, testing, and selection of materials that are intended for use in space vehicles, associated Ground Support Equipment (GSE), and facilities used during assembly, test, and flight operations. Included are requirements, criteria, and test methods for evaluating the flammability, offgassing, and compatibility of materials.

  5. An Evaluation of the Human Carcinogenic Potential of Ethylene Glycol Butyl Ether (An Interim Position Paper)

    EPA Science Inventory

    To determine the merit of a petition to remove ethylene glycol ether (EGBE) from the Agency's Hazardous Air Pollutant (HAP) list, EPA has developed an interim final position paper, called An Evaluation of the Human Carcinogenic Potential of Ethylene Glycol Butyl Ether, tha...

  6. Performance evaluation of advanced battery technologies for electric vehicle applications

    NASA Astrophysics Data System (ADS)

    Deluca, W. H.; Tummillo, A. F.; Kulaga, J. E.; Webster, C. E.; Gillie, K. R.; Hogrefe, R. L.

    1990-01-01

    At the Argonne Analysis and Diagnostic Laboratory, advanced battery technology evaluations are performed under simulated electric vehicle operating conditions. During 1989 and the first quarter of 1990, single cell and multicell modules from seven developers were examined for the Department of Energy and Electric Power Research Institute. The results provide battery users, developers, and program managers with an interim measure of the progress being made in battery R&D programs, a comparison of battery technologies, and a source of basic data for modeling and continuing R&D. This paper summarizes the performance and life characterizations of two single cells and seven 3- to 960-cell modules that encompass six technologies (Na/S, Ni/Fe, Ni/Cd, Ni-metal hydride, lead-acid, and Zn/Br).

  7. Research study on materials processing in space Skylab experiment M553 - sphere forming

    NASA Technical Reports Server (NTRS)

    Johnson, P. C.; Peters, E. T.; Wechsler, A. E.

    1973-01-01

    A research program was conducted to study the solidification of metals in the form of small spheres both in the one gravity environment of the earth laboratory and the low gravity environment of KC-135 trajectory flights and the Skylab 1/2 mission. The program had three phases. The details of the results of this program are contained in interim reports prepared at the conclusion of each of the three phases. This final report is intended to summarize the efforts and results described in detail in each of these interim reports, with particular emphasis on the differences observed between the ground-based and Skylab flight specimens.

  8. Quarterly report of RCRA groundwater monitoring data for period January 1, 1993 through March 31, 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-07-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. This quarterly report contains data received between March 8 and May 24, 1993, which are the cutoffmore » dates for this reporting period. This report may contain not only data from the January through March quarter but also data from earlier sampling events that were not previously reported.« less

  9. Generator Set Environmental and Stability Testing

    DTIC Science & Technology

    2015-03-01

    UNCLASSIFIED GENERATOR SET ENVIRONMENTAL AND STABILITY TESTING INTERIM REPORT TFLRF No. 460 by Gregory A. Hansen Edwin A...it to the originator. UNCLASSIFIED GENERATOR SET ENVIRONMENTAL AND STABILITY TESTING INTERIM REPORT TFLRF No. 460 by...TITLE AND SUBTITLE Generator Set Environmental and Stability Testing 5a. CONTRACT NUMBER W56HZV-09-C-0100 5b. GRANT NUMBER 5c. PROGRAM

  10. An Interim Report on a Fifteen Point Plan to Reduce Racial Isolation and Provide Quality Integrated Education.

    ERIC Educational Resources Information Center

    Rochester City School District, NY.

    This is an interim report of the second full year of the "Fifteen Point Plan." Although majority of comparisons between groups shows no significant statistical differences, differentials in achievement may become more noticeable as the program effects are reinforced with time, and through cumulative experience. From data analyzed after…

  11. 76 FR 56708 - Ohio: Final Authorization of State Hazardous Waste Management Program Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-14

    .... January 4, 1989, 54 FR 246.... NESHAPS: Final Standards for May 14, 2001, 66 FR 24270..... OAC 3745-50-41...; Checklist 188.1. NESHAPS: Interim Standards for February 13, 2002, 67 FR 6792. OAC 3745-50-44; 3745-50-66... Waste Combustors 2009. (Interim Standards Rule); Checklist 197. NESHAPS: Standards for Hazardous...

  12. Interim Policy for Evaluation of Stereoisomeric Pesticides

    EPA Pesticide Factsheets

    An interim approach for determining data requirements for non-racemic mixtures of stereoisomeric pesticides. These data are needed in order to assess the risk posed to ecosystems and drinking water sources by these mixtures.

  13. 75 FR 31609 - Conservation Stewardship Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-03

    ...Section 2301 of the Food, Conservation, and Energy Act of 2008 (2008 Act) amended the Food Security Act of 1985 to establish the Conservation Stewardship Program (CSP). On July 29, 2009, the Natural Resources Conservation Service (NRCS) published an interim final rule for CSP with a 60-day public comment period. On September 21, 2009, the public comment period was extended 30 days. NRCS is publishing a final rule that addresses the comments received on the interim final rule and makes other minor adjustments to improve clarity of the rule.

  14. Atmospheric Effects of Subsonic Aircraft: Interim Assessment Report of the Advanced Subsonic Technology Program

    NASA Technical Reports Server (NTRS)

    Friedl, Randall R. (Editor)

    1997-01-01

    This first interim assessment of the subsonic assessment (SASS) project attempts to summarize concisely the status of our knowledge concerning the impacts of present and future subsonic aircraft fleets. It also highlights the major areas of scientific uncertainty, through review of existing data bases and model-based sensitivity studies. In view of the need for substantial improvements in both model formulations and experimental databases, this interim assessment cannot provide confident numerical predictions of aviation impacts. However, a number of quantitative estimates are presented, which provide some guidance to policy makers.

  15. Different predictive values of interim 18F-FDG PET/CT in germinal center like and non-germinal center like diffuse large B-cell lymphoma.

    PubMed

    Kim, Jihyun; Lee, Jeong-Ok; Paik, Jin Ho; Lee, Won Woo; Kim, Sang Eun; Song, Yoo Sung

    2017-01-01

    Diffuse large B-cell lymphoma (DLBCL) is a pathologically heterogeneous disease with different prognoses according to its molecular profiles. Despite the broad usage of 18 F-fluoro-2-dexoxy-D-glucose (FDG) positron emission tomography/computed tomography (PET/CT), previous studies that have investigated the value of interim 18 F-FDG PET/CT in DLBCL have given the controversial results. The purpose of this study was to evaluate the prognostic value of interim 18 F-FDG PET/CT in DLBCL according to germinal center B cell-like (GCB) and non-GCB molecular profiling. We enrolled 118 newly diagnosed DLBCL patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). Interim 18 F-FDG PET/CT scans performed after 2 or 3 cycles of R-CHOP treatment were evaluated based on the Lugano response criteria. Patients were grouped as GCB or non-GCB molecular subtypes according to immunohistochemistry results of CD10, BCL6, and MUM1, based on Hans' algorithm. In total 118 DLBCL patients, 35 % were classified as GCB, and 65 % were classified as non-GCB. Interim PET/CT was negative in 70 %, and positive in 30 %. During the median follow-up period of 23 months, the positive interim 18 F-FDG PET/CT group showed significantly inferior progression free survival (PFS) compared to the negative interim 18 F-FDG PET/CT group (P = 0.0004) in entire patients. A subgroup analysis according to molecular profiling demonstrated significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in GCB subtype of DLBCL (P = 0.0001), but there was no significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in non-GCB subtype of DLBCL. Interim 18 F-FDG PET/CT scanning had a significant predictive value for disease progression in patients with the GCB subtype of DLBCL treated with R-CHOP, but not in those with the non-GCB subtype. Therefore, molecular profiles of DLBCL should be considered for interim 18 F-FDG PET/CT practice.

  16. An Interim Report on Pennsylvania's Framework for Leadership: Frequently Asked Questions

    ERIC Educational Resources Information Center

    Bing-ru, Teh; Chiang, Hanley; Lipscomb, Stephen; Gill, Brian

    2014-01-01

    A new study analyzed data from the 2012/13 pilot of the Framework for Leadership (FFL), Pennsylvania's tool for evaluating the leadership practices of principals and assistant principals. Based on the FFL scores of 336 principals and 69 assistant principals evaluated by their supervisors in the 2012/13 school year, this interim report found that…

  17. Evaluation of the construction and performance of multiple layer polymer concrete overlays : interim report no. 2, condition of the overlays after five years in service.

    DOT National Transportation Integrated Search

    1987-01-01

    This interim report presents the results after 5 years of a study undertaken to evaluate multiple layer polymer concrete overlays over a 10-year period. The report indicates that an overlay of low permeability and high skid resistance can be successf...

  18. The SpringBoard Bursary Foundation Impact Assessment: Year 1. Interim Report

    ERIC Educational Resources Information Center

    Buchanan, Emily; Stevens, Eleanor; Straw, Suzanne

    2014-01-01

    The SpringBoard Bursary Foundation (SpringBoard) commissioned the National Foundation for Education Research (NFER) to undertake an evaluation of its activities and impacts between 2013 and 2018. This interim and summary report presents the findings of the first year of the evaluation. SpringBoard was established in 2012 to transform the lives of…

  19. Interim reliability evaluation program, Browns Ferry 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mays, S.E.; Poloski, J.P.; Sullivan, W.H.

    1981-01-01

    Probabilistic risk analysis techniques, i.e., event tree and fault tree analysis, were utilized to provide a risk assessment of the Browns Ferry Nuclear Plant Unit 1. Browns Ferry 1 is a General Electric boiling water reactor of the BWR 4 product line with a Mark 1 (drywell and torus) containment. Within the guidelines of the IREP Procedure and Schedule Guide, dominant accident sequences that contribute to public health and safety risks were identified and grouped according to release categories.

  20. Translating evidence into practice: pursuing perfection in pneumococcal vaccination in a rural community.

    PubMed

    Doyle, D M; Dauterive, R; Chuang, K H; Ellrodt, A G

    2001-11-01

    There are many challenges to effectively and efficiently translating evidence into practice. Potential strategies include (1) training more evidence-based practitioners in the art and science of evidence-based medicine, (2) enhancing the quality and availability of systematic reviews, and (3) more effectively linking evidence-based practitioners and evidence users through comprehensive behavioral change initiatives. Herein we explore the third strategy and highlight the key elements of success for a program using behavioral change strategies. We present a clinical model based on clear understanding of the "problem," a systematic approach to diagnosis, selection of scientifically sound treatment options, and effective evaluation with appropriate modification of the treatment plan. A successful program begins with effective team leadership, the expression of a clinically compelling case for change, and commitment to the pursuit of perfection in the delivery of key evidence-based interventions. The team must then diagnose behavioral barriers to change, using a systematic approach based on a published rigorous differential diagnosis framework. This diagnostic step provides the foundation for selection of effective dissemination and implementation strategies (treatments) proven to improve processes of care and clinical outcomes. Finally the team must evaluate progress toward perfection, reviewing interim data and adjusting the treatment regimen to newly diagnosed barriers. We then present a specific project (improving pneumococcal immunization rates in our rural community) and interim results to demonstrate the use of the framework in the real world.

  1. A Model Project in Career Education, K-12. Interim Report, December 1974.

    ERIC Educational Resources Information Center

    Wyoming State Dept. of Education, Cheyenne.

    The document presents an interim report of a project to establish career education programs for K-12 students in the Natrona County School District of Casper, Wyoming. Project activities were divided into: (1) career awareness, grades K-6; (2) career exploration, grades 7-9; (3) career preparation, grades 10-12; and (4) guidance. To meet the…

  2. Comparisons of Cooperative and Non-Cooperative Students: An Analysis of Student Accounting System Data. Interim Report, June, 1981.

    ERIC Educational Resources Information Center

    Frazier, Don

    The major purpose of this study was to identify unique effects of cooperative vocational education. This interim report is of results of the analyses of existing data bases. Comparisons of cooperative and non-cooperative vocational programs are made on the following variables: enrollments by age, sex and race, school status, work status,…

  3. RCRA, superfund and EPCRA hotline training module. Introduction to: Groundwater monitoring (40 cfr parts 264/265, subpart f) updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    The module presents the requirements for groundwater monitoring at interim status and permitted treatment, storage, and disposal facilities (TSDFs) under the Resource Conservation and Recovery Act (RCRA). The goal of the module is to explain the standards and specific requirements for groundwater monitoring programs at interim status and permitted facilities.

  4. TRICARE; changes included in the National Defense Authorization Act for fiscal year 2005; TRICARE Dental Program. Interim final rule.

    PubMed

    2005-09-21

    The Department is publishing this interim final rule to implement sections 711 and 715 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA-05), Public Law 108-375. Specifically, that legislation makes young dependents of deceased Service members eligible for enrollment in the TRICARE Dental Program when the child was not previously enrolled because of age, and authorizes post-graduate dental residents in a dental treatment facility of the uniformed services under a graduate dental education program accredited by the American Dental Association to provide dental treatment to dependents who are 12 years of age or younger and who are covered by a dental plan established under 10 U.S.C. 1076a. This rule also corrects certain references in 32 CFR 199.13. The rule is being published as an interim final rule with comment period in order to comply with statutory effective dates. Public comments are invited and will be considered for possible revisions to the final rule.

  5. Progress and future direction for the interim safe storage and disposal of Hanford high-level waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kinzer, J.E.; Wodrich, D.D.; Bacon, R.F.

    This paper describes the progress made at the largest environmental cleanup program in the United States. Substantial advances in methods to start interim safe storage of Hanford Site high-level wastes, waste characterization to support both safety- and disposal-related information needs, and proceeding with cost-effective disposal by the U.S. Department of Energy (DOE) and its Hanford Site contractors, have been realized. Challenges facing the Tank Waste Remediation System (TWRS) Program, which is charged with the dual and parallel missions of interim safe storage and disposal of the high-level tank waste stored at the Hanford Site, are described. In these times ofmore » budget austerity, implementing an ongoing program that combines technical excellence and cost effectiveness is the near-term challenge. The technical initiatives and progress described in this paper are made more cost effective by DOE`s focus on work force productivity improvement, reduction of overhead costs, and reduction, integration and simplification of DOE regulations and operations requirements to more closely model those used in the private sector.« less

  6. An Evaluation of the Individual Training Account/Eligible Training Provider Demonstration. Final Interim Report.

    ERIC Educational Resources Information Center

    D'Amico, Ronald; Martinez, Alexandria; Salzman, Jeffrey; Wagner, Robin

    In March 2000, thirteen grants were awarded as part of the Individual Training Account/Eligible Training Provider (ITA/ETP) Demonstration. In summer and fall of 2000, the grant recipients' activities were subjected to an interim evaluation. Site visits were made to each grantee to determine what ITA policies and practices were being formulated,…

  7. Evaluation of experimental rumble strip areas in Louisiana : interim report No. 1.

    DOT National Transportation Integrated Search

    1985-03-01

    This interim report was prepared to provide a review of nineteen rumble strip areas installed experimentally in Louisiana between August 1982 and September 1983. Situated randomly throughout central and southern Louisiana, construction of these coars...

  8. Results from the interim salt disposition program macrobatch 10 tank 21H qualification samples

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, T. B.; Bannochie, C. J.

    2017-02-23

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR). Further work will report the results of the Extraction-Scrub-Strip (ESS) testing (Task 5 of the TTR) using the Tank 21H material. Task 4 of the TTR (MST Strike) will not be completed for Salt Batch 10.

  9. Alternative Refrigerant Evaluation for High-Ambient Temperature Environments: R-22 and R-410A Alternatives for Mini-Split Air Conditioners

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abdelaziz, Omar; Munk, Jeffrey D.; Shrestha, Som S.

    The Oak Ridge National Laboratory (ORNL) High-Ambient Temperature Testing Program for Low-GWP Refrigerants aims to develop an understanding of the performance of low-Global Warming Potential (low-GWP) alternatives to Hydrochlorofluorocarbon (HCFC) and Hydrofluorocarbon (HFC) refrigerants in mini-split air conditioners under high ambient temperature conditions. This interim working paper describes the parties involved, the alternative refrigerants selection process, the test procedures, and the preliminary results.

  10. Phase 1 of the near term hybrid passenger vehicle development program. Appendix B: Trade-off studies, volume 1

    NASA Technical Reports Server (NTRS)

    Traversi, M.; Piccolo, R.

    1980-01-01

    Tradeoff study activities and the analysis process used are described with emphasis on (1) review of the alternatives; (2) vehicle architecture; and (3) evaluation of the propulsion system alternatives; interim results are presented for the basic hybrid vehicle characterization; vehicle scheme development; propulsion system power and transmission ratios; vehicle weight; energy consumption and emissions; performance; production costs; reliability, availability and maintainability; life cycle costs, and operational quality. The final vehicle conceptual design is examined.

  11. Evaluating the agreement between measurements and models of net ecosystem exchange at different times and timescales using wavelet coherence: an example using data from the North American Carbon Program Site-Level Interim Synthesis

    Treesearch

    P.C. Stoy; M.C. Dietze; A.D. Richardson; R. Vargas; A.G. Barr; R.S. Anderson; M.A. Arain; I.T. Baker; T.A. Black; J.M. Chen; R.B. Cook; C.M. Gough; R.F. Grant; D.Y. Hollinger; R.C. Izaurralde; C.J. Kucharik; P. Lafleur; B.E. Law; S. Liu; E. Lokupitiya; Y. Luo; J. W. Munger; C. Peng; B. Poulter; D.T. Price; D. M. Ricciuto; W. J. Riley; A. K. Sahoo; K. Schaefer; C.R. Schwalm; H. Tian; H. Verbeeck; E. Weng

    2013-01-01

    Earth system processes exhibit complex patterns across time, as do the models that seek to replicate these processes. Model output may or may not be significantly related to observations at different times and on different frequencies. Conventional model diagnostics provide an aggregate view of model-data agreement, but usually do not identify the time and frequency...

  12. Effects of Interim Assessments on Student Achievement: Evidence from a Large-Scale Experiment

    ERIC Educational Resources Information Center

    Konstantopoulos, Spyros; Miller, Shazia R.; van der Ploeg, Arie; Li, Wei

    2016-01-01

    We use data from a large-scale, school-level randomized experiment conducted in 2010-2011 in public schools in Indiana. Our sample includes more than 30,000 students in 70 schools. We examine the impact of two interim assessment programs (i.e., mCLASS in Grades K-2 and Acuity in Grades 3--8) on mathematics and reading achievement. Two-level models…

  13. Estimated economic impacts on the timber range and recreation programs on NFS and BLM public lands from adopting the proposed interim PACFISH.

    Treesearch

    Natalie A. Bolon; Christopher S. Hansen-Murray; Richard W. Haynes

    1995-01-01

    Implications of the interim comprehensive strategy for improved Pacific salmon and steelhead habitat management (PACFISH) were estimated for those Bureau of Land Management (BLM) districts and National Forest System (NFS) lands west of the Rocky Mountains that have anadromous fish. The physical impacts and associated mitigation costs from implementing the PACFISH...

  14. 25 CFR 39.1201 - Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of...

  15. 25 CFR 39.1201 - Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of...

  16. 25 CFR 39.1201 - Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of a...

  17. 25 CFR 39.1201 - Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of...

  18. Interim Service ISDN Satellite (ISIS) network model for advanced satellite designs and experiments

    NASA Technical Reports Server (NTRS)

    Pepin, Gerard R.; Hager, E. Paul

    1991-01-01

    The Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) Network Model for Advanced Satellite Designs and Experiments describes a model suitable for discrete event simulations. A top-down model design uses the Advanced Communications Technology Satellite (ACTS) as its basis. The ISDN modeling abstractions are added to permit the determination and performance for the NASA Satellite Communications Research (SCAR) Program.

  19. RCRA/UST, superfund, and EPCRA hotline training module. Introduction to: Groundwater monitoring (40 CFR parts 264/265, subpart F) updated as of July 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    The module presents the requirements for groundwater monitoring at interim status and permitted treatment, storage, and disposal facilities. It describes the groundwater monitoring criteria for interim status and permitted facilities. It explains monitoring well placement and outlines the three stages of the groundwater monitoring program for permitted facilities.

  20. The Impacts of Upward Bound Math-Science on Postsecondary Outcomes 7-9 Years after Scheduled High School Graduation: Final Report

    ERIC Educational Resources Information Center

    Seftor, Neil S.; Calcagno, Juan Carlos

    2010-01-01

    This final report updates the report "Upward Bound Math-Science: Program Description and Interim Impact Estimates" published in 2007 (Olsen et al. 2007). The 2007 interim report contained descriptive findings from a survey of Upward Bound Math-Science (UBMS) grantees from the late 1990s at the time of the study's initiation and impact estimates…

  1. U.S. Aeronautical L-Band Satellite Technology Test Program : Interim Tests Results

    DOT National Transportation Integrated Search

    1975-06-01

    The U.S. Aeronautical L-Band satellite test program was performed between September 1974 and April 1975 as part of an international ATS-6 L-Band satellite test program. The U.S. program consisted of both technology and ATC communications demonstratio...

  2. Computer Science 205. Interim Guide, 1983.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education, Winnipeg.

    This guide to a 4-unit, required high school computer science course emphasizes problem solving and computer programming and is designed for use with a variety of hardware configurations and programming languages. An overview covers the program rationale, goals and objectives, program design and description, program implementation, time allotment,…

  3. Evaluation of US 119 Pine Mountain safety improvements : interim report.

    DOT National Transportation Integrated Search

    2003-10-01

    The safety improvement project for a section of US 119 across Pine Mountain in Letcher County was initiated as an interim effort to address safety issues related t o roadway geometrics and specific problems related to truck traffic. : Specific object...

  4. Structural equation model for the evaluation of national funding on R&D project of SMEs in consideration with MBNQA criteria.

    PubMed

    Sohn, S Y; Gyu Joo, Yong; Kyu Han, Hong

    2007-02-01

    Financial support on the R&D in Science & Technology for SMEs at the governmental level plays a crucial role on the improvement of the national competitiveness. Korea Science & Engineering Foundation (KOSEF) has supported the R&D projects of SMEs with the competitive technology ability by way of the Science and Technology Promotion Fund. In this paper, we propose a structural equation model (SEM) to evaluate the performance of such a funding program in terms of three aspects: output, outcome and impact under given funding inputs, R&D environment of a recipient company, and external evaluation programs of funding organization. We adopt Malcolm Baldrige National Quality Award (MBNQA) criteria to assess the R&D environmental factors of recipient companies. In addition, we test the effect of interim evaluation of the funded project. The proposed model is applied to the real case and is used to identify the best practices as well as to provide feedback information for the improvement of the government funding programs of the R&D projects of SMEs.

  5. IVHS Countermeasures For Rear-End Collisions, Task 2 - Functional Goals, Interim Report

    DOT National Transportation Integrated Search

    1996-05-01

    THE ATTACHED REPORT IS FROM THE NHTSA SPONSORED PROGRAM, "IVHS COUNTERMEASURES FOR REAR-END COLLISIONS," CONTRACT #DTNH22-93-C-07326. : THIS PROGRAM?S PRIMARY OBJECTIVE IS THE DEVELOPMENT OF PRACTICAL PERFORMANCE : GUIDELINES OR SPECIFICATIONS FOR RE...

  6. Evaluation and Analysis of SEASAT-A Scanning Multichannel Microwave Radiometer (SSMR) Antenna Pattern Correction (APC) Algorithm. Sub-task 4: Interim Mode T Sub B Versus Cross and Nominal Mode T Sub B

    NASA Technical Reports Server (NTRS)

    Kitzis, J. L.; Kitzis, S. N.

    1979-01-01

    The brightness temperature data produced by the SMMR Antenna Pattern Correction algorithm are evaluated. The evaluation consists of: (1) a direct comparison of the outputs of the interim, cross, and nominal APC modes; (2) a refinement of the previously determined cos beta estimates; and (3) a comparison of the world brightness temperature (T sub B) map with actual SMMR measurements.

  7. Evaluation and analysis of Seasat-A scanning multichannel Microwave Radiometer (SMMR) Antenna Pattern Correction (APC) algorithm

    NASA Technical Reports Server (NTRS)

    Kitzis, J. L.; Kitzis, S. N.

    1979-01-01

    The brightness temperature data produced by the SMMR final Antenna Pattern Correction (APC) algorithm is discussed. The algorithm consisted of: (1) a direct comparison of the outputs of the final and interim APC algorithms; and (2) an analysis of a possible relationship between observed cross track gradients in the interim brightness temperatures and the asymmetry in the antenna temperature data. Results indicate a bias between the brightness temperature produced by the final and interim APC algorithm.

  8. Commentary: Interim leadership of academic departments at U.S. medical schools.

    PubMed

    Grigsby, R Kevin; Aber, Robert C; Quillen, David A

    2009-10-01

    Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.

  9. Second Interim Report on the Installation and Evaluation of Weigh-In-Motion Utilizing Quartz-Piezo Sensor Technology

    DOT National Transportation Integrated Search

    1999-11-01

    The objective of this study is to determine the sensor survivability, accuracy and reliability of quartz-piezoelectric weigh-in-motion (WIM) sensors under actual traffic conditions in Connecticut's environment. This second interim report provides a s...

  10. The use of robotics for nondestructive inspection of steel highway bridges and structures: interim report.

    DOT National Transportation Integrated Search

    1998-01-01

    This interim report describes the progress during the first year of a project to develop robotics hardware for nondestructive evaluation of steel structures. The project objectives are to (1) develop and test an improved prototype (POLECAT-II) crawli...

  11. Kids Identifying and Defeating Stroke (KIDS): development and implementation of a multiethnic health education intervention to increase stroke awareness among middle school students and their parents.

    PubMed

    Mullen Conley, Kathleen; Juhl Majersik, Jennifer; Gonzales, Nicole R; Maddox, Katherine E; Pary, Jennifer K; Brown, Devin L; Moyé, Lemuel A; Espinosa, Nina; Grotta, James C; Morgenstern, Lewis B

    2010-01-01

    The Kids Identifying and Defeating Stroke (KIDS) project is a 3-year prospective, randomized, controlled, multiethnic school-based intervention study. Project goals include increasing knowledge of stroke signs and treatment and intention to immediately call 911 among Mexican American (MA) and non-Hispanic White (NHW) middle school students and their parents. This article describes the design, implementation, and interim evaluation of this theory-based intervention. Intervention students received a culturally appropriate stroke education program divided into four 50-minute classes each year during the sixth, seventh, and eighth grades. Each class session also included a homework assignment that involved the students' parents or other adult partners. Interim-test results indicate that this educational intervention was successful in improving students' stroke symptom and treatment knowledge and intent to call 911 upon witnessing a stroke compared with controls. The authors conclude that this school-based educational intervention to reduce delay time to hospital arrival for stroke shows early promise.

  12. One Week of Public Television, April 1972. Number Seven.

    ERIC Educational Resources Information Center

    Katzman, Natan

    Seventh in a series of annual surveys, this interim report describes analyses of the programing schedules of public television broadcasters during one week in April, 1972. Results are reported for four different types of programing: instructional programing, Children's Television Workshop productions, news and public affairs programing, and…

  13. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  14. A study of the usage of LPAs by the North Carolina Division of Motor Vehicles : interim report - phase I.

    DOT National Transportation Integrated Search

    2014-02-27

    This interim report was prepared to assist NCDMV in meeting the requirements of S.B. 402, Sec. 34.17, which mandates that NCDOT in collaboration with NCDMV shall evaluate current contractual models and compensation for license plate agency (LPA...

  15. Interim Policy Options for Commercialization of Solar Heating and Cooling Systems.

    ERIC Educational Resources Information Center

    Bezdek, Roger

    This interim report reviews the major incentive policy options available to accelerate market penetration of solar heating and cooling (SHAC) systems. Feasible policy options designed to overcome existing barriers to commercial acceptance and market penetration are identified and evaluated. The report is divided into seven sections, each dealing…

  16. In vitro evaluation of the marginal integrity of CAD/CAM interim crowns.

    PubMed

    Kelvin Khng, Kwang Yong; Ettinger, Ronald L; Armstrong, Steven R; Lindquist, Terry; Gratton, David G; Qian, Fang

    2016-05-01

    The accuracy of interim crowns made with computer-aided design and computer-aided manufacturing (CAD/CAM) systems has not been well investigated. The purpose of this in vitro study was to evaluate the marginal integrity of interim crowns made by CAD/CAM compared with that of conventional polymethylmethacrylate (PMMA) crowns. A dentoform mandibular left second premolar was prepared for a ceramic crown and scanned for the fabrication of 60 stereolithical resin dies, half of which were scanned to fabricate 15 Telio CAD-CEREC and 15 Paradigm MZ100-E4D-E4D crowns. Fifteen Caulk and 15 Jet interim crowns were made on the remaining resin dies. All crowns were cemented with Tempgrip under a 17.8-N load, thermocycled for 1000 cycles, placed in 0.5% acid fuschin for 24 hours, and embedded in epoxy resin before sectioning from the mid-buccal to mid-lingual surface. The marginal discrepancy was measured using a traveling microscope, and dye penetration was measured as a percentage of the overall length under the crown. The mean vertical marginal discrepancy of the conventionally made interim crowns was greater than for the CAD/CAM crowns (P=.006), while no difference was found for the horizontal component (P=.276). The mean vertical marginal discrepancy at the facial surface of the Caulk crowns was significantly greater than that of the other 3 types of interim crowns (P<.001). At the facial margin, the mean horizontal component of the Telio crowns was significantly larger than that of the other 3 types, with no difference at the lingual margins (P=.150). The mean percentage dye penetration for the Paradigm MZ100-E4D crowns was significantly greater and for Jet crowns significantly smaller than for the other 3 crowns (P<.001). However, the mean percentage dye penetration was significantly correlated with the vertical and horizontal marginal discrepancies of the Jet interim crowns at the facial surface and with the horizontal marginal discrepancies of the Caulk interim crowns at the lingual surface (P<.01 in each instance). A significantly smaller vertical marginal discrepancy was found with the interim crowns fabricated by CAD/CAM as compared with PMMA crowns; however, this difference was not observed for the horizontal component. The percentage dye penetration was correlated with vertical and horizontal discrepancies at the facial surface for the Jet interim crowns and with horizontal discrepancies at the lingual surface for the Caulk interim crowns. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  17. Evaluation of Future Fuels in a High Pressure Common Rail System - Part 2. 2011 Ford 6.7L Diesel Engine

    DTIC Science & Technology

    2013-01-01

    An injector needle is shown for each test in Figure 41. UNCLASSIFIED 37 UNCLASSIFIED Full Needle 60°C Ultra Low Sulfur Diesel 60°C...UNCLASSIFIED EVALUATION OF FUTURE FUELS IN A HIGH PRESSURE COMMON RAIL SYSTEM – PART 2 2011 FORD 6.7L DIESEL ENGINE INTERIM REPORT TFLRF...UNCLASSIFIED UNCLASSIFIED EVALUATION OF FUTURE FUELS IN A HIGH PRESSURE COMMON RAIL SYSTEM – PART 2 2011 FORD 6.7L DIESEL ENGINE INTERIM REPORT TFLRF

  18. Preceptor use of classroom assessment techniques to stimulate higher-order thinking in the clinical setting.

    PubMed

    Davidson, Judy E

    2009-03-01

    The purpose of this article is to provide examples of learning activities to be used as formative (interim) evaluation of an in-hospital orientation or cross-training program. Examples are provided in the form of vignettes that have been derived from strategies described in the literature as classroom assessment techniques. Although these classroom assessment techniques were originally designed for classroom experiences, they are proposed as methods for preceptors to stimulate the development of higher-order thinking such as synthesizing information, solving problems, and learning how to learn.

  19. Science 26: Teacher Resource Manual. Integrated Occupational Program. Interim 1991.

    ERIC Educational Resources Information Center

    Alberta Dept. of Education, Edmonton. Curriculum Branch.

    The Integrated Occupation Science 26 Program is an optional program designed to allow students in Alberta, Canada to meet the credit requirements of the Certificate of Achievement and facilitate transfer to the General High School Diploma Program. This Teacher Resource Manual is provided to assist classroom teachers to implement the Science 26…

  20. 76 FR 10089 - Value-Added Producer Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-23

    ..., business plans, and marketing strategies. The program will also provide working capital for expenses such as implementing an existing viable marketing strategy. The Agency will implement the program to meet... projects that develop mid-tier value marketing chains. DATES: This interim rule is effective March 25, 2011...

  1. 77 FR 31724 - Exchange Visitor Program-Summer Work Travel; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... DEPARTMENT OF STATE 22 CFR Part 62 RIN 1400-AD14 [Public Notice 7902] Exchange Visitor Program--Summer Work Travel; Correction AGENCY: Department of State. ACTION: Interim final rule; correction SUMMARY: This document contains minor corrections to the Exchange Visitor Program--Summer Work Travel...

  2. DECISION-MAKING ALIGNED WITH RAPID-CYCLE EVALUATION IN HEALTH CARE.

    PubMed

    Schneeweiss, Sebastian; Shrank, William H; Ruhl, Michael; Maclure, Malcolm

    2015-01-01

    Availability of real-time electronic healthcare data provides new opportunities for rapid-cycle evaluation (RCE) of health technologies, including healthcare delivery and payment programs. We aim to align decision-making processes with stages of RCE to optimize the usefulness and impact of rapid results. Rational decisions about program adoption depend on program effect size in relation to externalities, including implementation cost, sustainability, and likelihood of broad adoption. Drawing on case studies and experience from drug safety monitoring, we examine how decision makers have used scientific evidence on complex interventions in the past. We clarify how RCE alters the nature of policy decisions; develop the RAPID framework for synchronizing decision-maker activities with stages of RCE; and provide guidelines on evidence thresholds for incremental decision-making. In contrast to traditional evaluations, RCE provides early evidence on effectiveness and facilitates a stepped approach to decision making in expectation of future regularly updated evidence. RCE allows for identification of trends in adjusted effect size. It supports adapting a program in midstream in response to interim findings, or adapting the evaluation strategy to identify true improvements earlier. The 5-step RAPID approach that utilizes the cumulating evidence of program effectiveness over time could increase policy-makers' confidence in expediting decisions. RCE enables a step-wise approach to HTA decision-making, based on gradually emerging evidence, reducing delays in decision-making processes after traditional one-time evaluations.

  3. Interim analysis: A rational approach of decision making in clinical trial.

    PubMed

    Kumar, Amal; Chakraborty, Bhaswat S

    2016-01-01

    Interim analysis of especially sizeable trials keeps the decision process free of conflict of interest while considering cost, resources, and meaningfulness of the project. Whenever necessary, such interim analysis can also call for potential termination or appropriate modification in sample size, study design, and even an early declaration of success. Given the extraordinary size and complexity today, this rational approach helps to analyze and predict the outcomes of a clinical trial that incorporate what is learned during the course of a study or a clinical development program. Such approach can also fill the gap by directing the resources toward relevant and optimized clinical trials between unmet medical needs and interventions being tested currently rather than fulfilling only business and profit goals.

  4. Maywood Interim Storage Site: Annual environmental report for calendar year 1990, Maywood, New Jersey

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-01

    Environmental monitoring of the US Department of Energy's (DOE) Maywood Interim Storage Site (MISS) and surrounding area began in 1984. MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The MISS Environmental monitoring programs was established to accommodate facility characteristics, applicable regulations, hazard potential, quantities and concentrations of materials released, extent and use of affected land and water, and localmore » public interest or concern. The environmental monitoring program at MISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and total uranium, radium-226, and thorium-232 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) standards; federal, state, and local applicable or relevant and appropriate requirements (ARARs); and/or DOE derived concentration guidelines (DCGs). Environmental standards, ARARs, and DCGs are established to protect public health and the environment. Results from the 1990 environmental monitoring program show that concentrations of the contaminants of concern were all below applicable standards. Because the site is used only for interim storage and produces no processing effluents, all monitoring, except for radon and direct gamma radiation, was done on a quarterly basis. 18 refs., 17 figs., 28 tabs.« less

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bolan, N.A.; Hansen-Murray, C.S.; Haynes, R.W.

    Implications of the interim comprehensive strategy for improved Pacific salmon and steelhead habitat management (PACFISH) were estimated for those Bureau of Land Management (BLM) districts and National Forest System (NFS) lands west of the Rocky Mountains that have anadromous fish. The physical impacts and associated mitigation costs from implementing the PACFISH strategy over the next decade in Pacific Northwest, Intermountain, Northern, Pacific Southwest, and Alaska Region National Forest and BLM district recreation, range, and timber programs were analyzed with the actual current output as the base. Economic considerations were added to evaluate any change in the perceived ranking of severitymore » among the impacts. Two cases were considered in the analyses: a derived worst case, where a total reduction of the actual current output of the programs in anadromous fishbearing drainages occurs (giving a minimum value for the programs in those drainages), and a mitigated case where all or part of the loss is mitigated and the cost of doing so is evaluated with two phases, one without economics and the other with it.« less

  6. Terrestrial gravity data analysis for interim gravity model improvement

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This is the first status report for the Interim Gravity Model research effort that was started on June 30, 1986. The basic theme of this study is to develop appropriate models and adjustment procedures for estimating potential coefficients from terrestrial gravity data. The plan is to use the latest gravity data sets to produce coefficient estimates as well as to provide normal equations to NASA for use in the TOPEX/POSEIDON gravity field modeling program.

  7. Facilitating adaptive management in a government program: A household energy efficiency case study.

    PubMed

    Curtis, Jim; Graham, Alex; Ghafoori, Eraj; Pyke, Susan; Kaufman, Stefan; Boulet, Mark

    2017-02-01

    Interim evaluations of government programs can sometimes reveal lower than expected outcomes, leading to the question of how adjustments can be made while the program is still underway. Although adaptive management frameworks can provide a practical roadmap to address this question, a lack of successful learnings and poor implementation have hampered the progress and wider application of adaptive management. Using a case study involving an energy efficiency government program targeting low-income households, this article provides supporting evidence on how adaptive management can be facilitated and applied. Factors such as proactive and responsive leadership, establishing a research-practice interface, and recognizing the skills, expertise, and contributions of multiple stakeholders guided adjustments to the program, and later paved the way for longer-term organizational learning that impacted how other programs are delivered. Implications for knowledge and practice, and a discussion of the challenges faced in the program, advance current thinking in adaptive management. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. Global Spent Fuel Logistics Systems Study (GSFLS). Volume 2A. GSFLS visit findings (appendix). Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1978-01-31

    This appendix is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. This appendix provides the legal/regulatory reference material, supportive of Volume 2 - GSFLS Visit Finding and Evaluations; and certain background material on British Nuclear Fuel Limited (BNFL).

  9. Cost Implications of an Interim Storage Facility in the Waste Management System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jarrell, Joshua J.; Joseph, III, Robert Anthony; Howard, Rob L

    2016-09-01

    This report provides an evaluation of the cost implications of incorporating a consolidated interim storage facility (ISF) into the waste management system (WMS). Specifically, the impacts of the timing of opening an ISF relative to opening a repository were analyzed to understand the potential effects on total system costs.

  10. Physics 200, 300 Interim Guide.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education, Winnipeg.

    This guide, developed for the physics 200, 300 program in Manitoba, is designed to articulate with previous science courses; provide concepts, processes, and skills which will enable students to continue in physics-related areas; and relate physics to practical applications in everyday life. It includes a program overview (with program goals and…

  11. Chemistry 200, 300 Interim Guide.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education, Winnipeg.

    This guide, developed for the chemistry 200, 300 program in Manitoba, is designed to articulate with previous science courses, provide concepts, processes, and skills which will enable students to continue in chemistry-related areas, and relate chemistry to practical applications in everyday life. It includes a program overview (with program goals…

  12. 75 FR 39859 - Structure and Practices of the Video Relay Service Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-13

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 10-51; FCC 10-88] Structure and Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Interim rule... a summary of the Commission's Structure and Practices of the Video Relay Service Program, Order...

  13. 76 FR 47476 - Structure and Practices of the Video Relay Service Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 10-51; FCC 11-118] Structure and Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Interim rule... summary of the Commission's Structure and Practices of the Video Relay Service Program, Order (Order...

  14. Linear Programming for Vocational Education Planning. Interim Report.

    ERIC Educational Resources Information Center

    Young, Robert C.; And Others

    The purpose of the paper is to define for potential users of vocational education management information systems a quantitative analysis technique and its utilization to facilitate more effective planning of vocational education programs. Defining linear programming (LP) as a management technique used to solve complex resource allocation problems…

  15. Communicating radon risk effectively: a mid-course evaluation. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, V.K.; Desvousges, W.H.; Fisher, A.

    A panel of 2300 homeowners was divided into subgroups to test the effectiveness of six alternative ways of explaining the risk from naturally occurring radon gas. The research design focused on two dimensions: qualitative vs. quantitative and directive vs. evaluative. These characteristics led to 4 experimental booklets, which were compared with EPA's Citizen's Guide and a one-page fact sheet. The evaluation examined how much people learned about radon; whether they could form risk perceptions consistent with their home's measured radon level; and whether they felt they had enough information to make a decision about mitigation. The fact sheet did notmore » perform well on any of these evaluation criteria. None of the five booklets clearly was best for all 3 evaluation criteria; the report discusses the implications for designing an effective radon-risk communication program.« less

  16. Laboratory evaluation of advanced battery technologies for electric vehicle applications

    NASA Astrophysics Data System (ADS)

    Deluca, W. H.; Kulaga, J. E.; Hogrefe, R. L.; Tummilo, A. F.; Webster, C. E.

    1989-03-01

    During 1988, battery technology evaluations were performed for the Department of Energy and Electric Power Research Institute at the Argonne Analysis and Diagnostic Laboratory. Cells and multicell modules from four developers were examined to determine their performance and life characteristics for electric vehicle propulsion applications. The results provide an interim measure of the progress being made in battery R and D programs, a comparison of battery technologies, and a source of basic data for modeling and continuing R and D. This paper summarizes the performance and life characterizations of twelve single cells and six 3- to 24-cell modules that encompass four technologies (Na/S, Ni/Fe, lead-acid, and Fe/Air).

  17. Data Analysis of GPM Constellation Satellites-IMERG and ERA-Interim precipitation products over West of Iran

    NASA Astrophysics Data System (ADS)

    Sharifi, Ehsan; Steinacker, Reinhold; Saghafian, Bahram

    2016-04-01

    Precipitation is a critical component of the Earth's hydrological cycle. The primary requirement in precipitation measurement is to know where and how much precipitation is falling at any given time. Especially in data sparse regions with insufficient radar coverage, satellite information can provide a spatial and temporal context. Nonetheless, evaluation of satellite precipitation is essential prior to operational use. This is why many previous studies are devoted to the validation of satellite estimation. Accurate quantitative precipitation estimation over mountainous basins is of great importance because of their susceptibility to hazards. In situ observations over mountainous areas are mostly limited, but currently available satellite precipitation products can potentially provide the precipitation estimation needed for meteorological and hydrological applications. One of the newest and blended methods that use multi-satellites and multi-sensors has been developed for estimating global precipitation. The considered data set known as Integrated Multi-satellitE Retrievals (IMERG) for GPM (Global Precipitation Measurement) is routinely produced by the GPM constellation satellites. Moreover, recent efforts have been put into the improvement of the precipitation products derived from reanalysis systems, which has led to significant progress. One of the best and a worldwide used model is developed by the European Centre for Medium Range Weather Forecasts (ECMWF). They have produced global reanalysis daily precipitation, known as ERA-Interim. This study has evaluated one year of precipitation data from the GPM-IMERG and ERA-Interim reanalysis daily time series over West of Iran. IMERG and ERA-Interim yield underestimate the observed values while IMERG underestimated slightly and performed better when precipitation is greater than 10mm. Furthermore, with respect to evaluation of probability of detection (POD), threat score (TS), false alarm ratio (FAR) and probability of false detection (POFD) IMERG yields a better value of POD, TS, FAR and POFD in comparison to era-Interim. Overall, ERA-Interim product produced fewer robust results when compared to IMERG.

  18. Interim guidance for implementing SAFETEA-LU provisions on planning, environment, and air quality for FHWA authorities

    DOT National Transportation Integrated Search

    2007-02-14

    This final rule revises the regulations governing the development of metropolitan transportation plans and programs for urbanized areas, State transportation plans and programs and the regulations for Congestion Management Systems. The revision resul...

  19. Considerations for Domestic Law Enforcement Implementation of a UAS Program in the Proposed FAA Regulatory Environment of Integration into the National Airspace System

    DTIC Science & Technology

    2015-12-01

    institutional review board (IRB)-approved sequence was established for Delphi panel participants. The collection of data from the Delphi panel...The following year, the Office of the Inspector General Audit Division within the U.S. Department of Justice (DOJ) released an interim report on the...iacp_uaguidelines.pdf 11 Department of Justice, Office of the Inspector General, Audit Division, Interim Report on the Department of Justice’s Use and Support of

  20. The development of an interim generalized gate logic software simulator

    NASA Technical Reports Server (NTRS)

    Mcgough, J. G.; Nemeroff, S.

    1985-01-01

    A proof-of-concept computer program called IGGLOSS (Interim Generalized Gate Logic Software Simulator) was developed and is discussed. The simulator engine was designed to perform stochastic estimation of self test coverage (fault-detection latency times) of digital computers or systems. A major attribute of the IGGLOSS is its high-speed simulation: 9.5 x 1,000,000 gates/cpu sec for nonfaulted circuits and 4.4 x 1,000,000 gates/cpu sec for faulted circuits on a VAX 11/780 host computer.

  1. A systematic review of the reporting of Data Monitoring Committees' roles, interim analysis and early termination in pediatric clinical trials

    PubMed Central

    2009-01-01

    Background Decisions about interim analysis and early stopping of clinical trials, as based on recommendations of Data Monitoring Committees (DMCs), have far reaching consequences for the scientific validity and clinical impact of a trial. Our aim was to evaluate the frequency and quality of the reporting on DMC composition and roles, interim analysis and early termination in pediatric trials. Methods We conducted a systematic review of randomized controlled clinical trials published from 2005 to 2007 in a sample of four general and four pediatric journals. We used full-text databases to identify trials which reported on DMCs, interim analysis or early termination, and included children or adolescents. Information was extracted on general trial characteristics, risk of bias, and a set of parameters regarding DMC composition and roles, interim analysis and early termination. Results 110 of the 648 pediatric trials in this sample (17%) reported on DMC or interim analysis or early stopping, and were included; 68 from general and 42 from pediatric journals. The presence of DMCs was reported in 89 of the 110 included trials (81%); 62 papers, including 46 of the 89 that reported on DMCs (52%), also presented information about interim analysis. No paper adequately reported all DMC parameters, and nine (15%) reported all interim analysis details. Of 32 trials which terminated early, 22 (69%) did not report predefined stopping guidelines and 15 (47%) did not provide information on statistical monitoring methods. Conclusions Reporting on DMC composition and roles, on interim analysis results and on early termination of pediatric trials is incomplete and heterogeneous. We propose a minimal set of reporting parameters that will allow the reader to assess the validity of trial results. PMID:20003383

  2. Space Tug systems study. Volume 2: Compendium

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Possible storable propellant configurations and program plans are evaluated for the space tug. Alternatives examined include: use of existing expendable stages modified for use with shuttle, followed by a space tug at a later date; use of a modified growth version of existing expendable stages for greater performance and potential reuse, followed by a space tug at a later date; use of a low development cost, reusable, interim space tug available at shuttle initial operational capability (IOC) that could be evolved to greater system capabilities at a later date; and use a direct developed tug with maximum potential to be available at some specified time after space shuttle IOC. The capability options were narrowed down to three final options for detailed program definition.

  3. Flight set 360L007 (STS-33) insulation component. Volume 3: Final release

    NASA Technical Reports Server (NTRS)

    Hicken, Steve

    1990-01-01

    Volume 3 of this postfire report deals with the insulation component of the RSRM. The report is released twice for each flight set. The interim release contract date is on or before 60 days after the last field joint or nozzle to case joint is disassembled at KSC and contain the results of the KSC visual evaluation. The data contained in Volume 3 interim release supersedes the insulation data presented in the KSC 10 day report. The final release contract data is on or before 60 days after the last factory joint is disassembled at the Clearfield H-7 facility and contains the results of all visual evaluations and a thermal safety factor analysis. The data contained in the Volume 3 final release supersedes the interim release and the insulation data presented in the Clearfield 10 day report.

  4. NIITEK-NVESD AMDS program and interim field-ready system

    NASA Astrophysics Data System (ADS)

    Hibbard, Mark W.; Etebari, Ali

    2010-04-01

    NIITEK (Non-Intrusive Inspection Technology, Inc) develops and fields vehicle-mounted mine and buried threat detection systems. Since 2003, the NIITEK has developed and tested a remote robot-mounted mine detection system for use in the NVESD AMDS program. This paper will discuss the road map of development since the outset of the program, including transition from a data collection platform towards a militarized field-ready system for immediate use as a remote countermine and buried threat detection solution with real-time autonomous threat classification. The detection system payload has been integrated on both the iRobot Packbot and the Foster-Miller Talon robot. This brief will discuss the requirements for a successful near-term system, the progressive development of the system, our current real-time capabilities, and our planned upgrades for moving into and supporting field testing, evaluation, and ongoing operation.

  5. 33 CFR 385.39 - Evaluating progress towards other water-related needs of the region provided for in the Plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS... other. (3) The Department of the Army shall include these interim targets in appropriate Corps of... provided for in the Plan. These interim targets shall reflect the incremental accomplishment of the...

  6. 33 CFR 385.39 - Evaluating progress towards other water-related needs of the region provided for in the Plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS... other. (3) The Department of the Army shall include these interim targets in appropriate Corps of... provided for in the Plan. These interim targets shall reflect the incremental accomplishment of the...

  7. 33 CFR 385.39 - Evaluating progress towards other water-related needs of the region provided for in the Plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS... other. (3) The Department of the Army shall include these interim targets in appropriate Corps of... provided for in the Plan. These interim targets shall reflect the incremental accomplishment of the...

  8. 33 CFR 385.39 - Evaluating progress towards other water-related needs of the region provided for in the Plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS... other. (3) The Department of the Army shall include these interim targets in appropriate Corps of... provided for in the Plan. These interim targets shall reflect the incremental accomplishment of the...

  9. 33 CFR 385.39 - Evaluating progress towards other water-related needs of the region provided for in the Plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS... other. (3) The Department of the Army shall include these interim targets in appropriate Corps of... provided for in the Plan. These interim targets shall reflect the incremental accomplishment of the...

  10. 77 FR 1862 - Mailing of Tickets Under the Ticket to Work Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-12

    ... Tickets Under the Ticket to Work Program AGENCY: Social Security Administration. ACTION: Interim final... Ticket to Work (Ticket) to disabled beneficiaries for participation in the Ticket to Work program (Ticket... beneficiaries who are most likely to return to work. We will send a Ticket to any eligible disabled beneficiary...

  11. 78 FR 28953 - William D. Ford Federal Direct Loan Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... students since July 1, 2011. Second, the law placed a limit on Direct Subsidized Loan eligibility for new... students to complete their academic programs in a timely manner. Timely completion of programs will allow... student loan debt. This interim final rule implements the required statutory changes. Summary of the Major...

  12. 77 FR 25024 - Certification of Compliance With Meal Requirements for the National School Lunch Program Under...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ... SNDA was conducted. Larger proportions of elementary schools met the standards for total fat and... Certification of Compliance With Meal Requirements for the National School Lunch Program Under the Healthy.... SUMMARY: This interim rule amends National School Lunch Program regulations to conform to requirements...

  13. 76 FR 57740 - Program Requirement Revisions Related to the Public Water System Supervision Programs for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... System Supervision (PWSS) programs to meet the requirements of the Safe Drinking Water Act (SDWA). The State of Rhode Island has adopted drinking water regulations for the Arsenic Rule (66 FR 6976... adopted drinking water regulations for the Interim Enhanced Surface Water Treatment Rule (63 FR 69477...

  14. 76 FR 68116 - Structure and Practices of the Video Relay Service Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-03

    ... Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Interim rule... with the Commission's Structure and Practices of the Video Relay Service Program, Second Report and... announcement of the effective date of the rules. See, In the Matter of Structure and Practices of the Video...

  15. 10 CFR 712.19 - Removal from HRP.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OF ENERGY HUMAN RELIABILITY PROGRAM Establishment of and Procedures for the Human Reliability Program... immediately remove that individual from HRP duties pending a determination of the individual's reliability. A... HRP duties pending a determination of the individual's reliability is an interim, precautionary action...

  16. IVHS Countermeasures For Rear-End Collisions, Task 1 Volume I: Summary, Interim Report

    DOT National Transportation Integrated Search

    1994-02-01

    THE ATTACHED REPORT IS FROM THE NHTSA SPONSORED PROGRAM, "IVHS COUNTERMEASURES FOR REAR-END COLLISIONS," CONTRACT #DTNH22-93-C-07326. THE PROGRAM'S PRIMARY OBJECTIVE IS TO DEVELOP PRACTICAL PERFORMANCE GUIDELINES OR SPECIFICATIONS FOR REAR-END COLLIS...

  17. 76 FR 35318 - Competitive and Noncompetitive Nonformula Federal Assistance Programs-Administrative Provisions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-17

    ...] Competitive and Noncompetitive Nonformula Federal Assistance Programs--Administrative Provisions for Biomass..., without change, an interim rule containing a set of specific administrative requirements for the Biomass... Biomass Research and Development Initiative (BRDI) under which competitively awarded grants, contracts...

  18. 77 FR 52614 - Pre-Existing Condition Insurance Plan Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ...This document contains an amendment regarding program eligibility to the interim final regulation implementing the Pre- Existing Condition Plan program under provisions of the Patient Protection and Affordable Care Act. In light of a new process recently announced by the Department of Homeland Security, eligibility for the program is being amended so that the program does not inadvertently expand the scope of that process.

  19. Fit of interim crowns fabricated using photopolymer-jetting 3D printing.

    PubMed

    Mai, Hang-Nga; Lee, Kyu-Bok; Lee, Du-Hyeong

    2017-08-01

    The fit of interim crowns fabricated using 3-dimensional (3D) printing is unknown. The purpose of this in vitro study was to evaluate the fit of interim crowns fabricated using photopolymer-jetting 3D printing and to compare it with that of milling and compression molding methods. Twelve study models were fabricated by making an impression of a metal master model of the mandibular first molar. On each study model, interim crowns (N=36) were fabricated using compression molding (molding group, n=12), milling (milling group, n=12), and 3D polymer-jetting methods. The crowns were prepared as follows: molding group, overimpression technique; milling group, a 5-axis dental milling machine; and polymer-jetting group using a 3D printer. The fit of interim crowns was evaluated in the proximal, marginal, internal axial, and internal occlusal regions by using the image-superimposition and silicone-replica techniques. The Mann-Whitney U test and Kruskal-Wallis tests were used to compare the results among groups (α=.05). Compared with the molding group, the milling and polymer-jetting groups showed more accurate results in the proximal and marginal regions (P<.001). In the axial regions, even though the mean discrepancy was smallest in the molding group, the data showed large deviations. In the occlusal region, the polymer-jetting group was the most accurate, and compared with the other groups, the milling group showed larger internal discrepancies (P<.001). Polymer-jet 3D printing significantly enhanced the fit of interim crowns, particularly in the occlusal region. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.

    In September 2005, periodic sampling of groundwater was initiated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Centralia, Kansas. The sampling at Centralia is being performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE). The objective is to monitor levels of carbon tetrachloride contamination identified in the groundwater at Centralia (Argonne 2003, 2004, 2005a). Under the KDHE-approved monitoring plan (Argonne 2005b), the groundwater was sampledmore » twice yearly from September 2005 until September 2007 for analyses for volatile organic compounds (VOCs), as well as measurement of selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. The results from the two-year sampling program demonstrated the presence of carbon tetrachloride contamination at levels exceeding the KDHE Tier 2 risk-based screening level (RBSL) of 5 {micro}g/L for this compound in a localized groundwater plume that has shown little movement. The relative concentrations of chloroform, the primary degradation product of carbon tetrachloride, suggested that some degree of reductive dechlorination or natural biodegradation was taking place in situ at the former CCC/USDA facility on a localized scale. The CCC/USDA subsequently developed an Interim Measure Conceptual Design (Argonne 2007b), proposing a pilot test of the Adventus EHC technology for in situ chemical reduction (ISCR). The proposed interim measure (IM) was approved by the KDHE in November 2007 (KDHE 2007). Implementation of the pilot test occurred in November-December 2007. The objective was to create highly reducing conditions that would enhance both chemical and biological reductive dechlorination in the injection test area (Argonne 2009a). The KDHE (2008a) has requested that sitewide monitoring continue at Centralia until a final remedy has been selected (as part of a Corrective Action Study [CAS] evaluation) and implemented for this site. In response to this request, twice-yearly sampling of 10 monitoring wells and 6 piezometers (Figure 1.1) previously approved by the KDHE for monitoring of the groundwater at Centralia (KDHE 2005a,b) was continued in 2008. The sampling events under this extension of the two-year (2005-2007) monitoring program occurred in March and September 2008 (Argonne 2008b, 2009b). Additional piezometers specifically installed to evaluate the progress of the IM pilot test (PMP1-PMP9; Figure 1.2) were also sampled in 2008; the results of these analyses were reported and discussed separately (Argonne 2009a). On the basis of results of the 2005-2008 sitewide monitoring and the 2008 IM pilot test monitoring, the CCC/USDA recommended a revised sampling program to address both of the continuing monitoring objectives until a CAS for Centralia is developed (Section 4.2 in Argonne 2009b). The elements of this interim monitoring plan are as follows: (1) Annual sampling of twelve previously established (before the pilot test) monitoring points (locations identified in Figure 1.3) and the five outlying pilot test monitoring points (PMP4, PMP5, PMP6, PMP7, PMP9; Figure 1.4); and (2) Sampling twice yearly at the five pilot test monitoring points inside the injection area (PMP1-PMP3, PMP8, MW02; Figure 1.4). With the approval of the KDHE (2009), groundwater sampling for analyses of VOCs and selected other geochemical parameters was conducted at Centralia under the interim monitoring program outlined above in April and October 2009. This report documents the findings of the 2009 monitoring events.« less

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kupar, J.; Hasek, M.

    The Sanitary Landfill Corrective Action Plan proposes a two pronged approach to remediation. The first part of the total remediation strategy is the placement of a RCRA style closure cap to provide source control of contaminants into the groundwater. The second part of the proposed remediation package is a phased approach primarily using an in situ bioremediation system for groundwater clean up of the Constituents of Concern (COCs) that exceed their proposed Alternate Concentration Limits (ACL). The phased in approach of groundwater clean up will involve operation of the in situ bioremediation system, followed by evaluation of the Phase 1more » system and, if necessary, additional phased remediation strategies. This document presents pertinent information on operations, well locations, anticipated capture zones, monitoring strategies, observation wells and other information which will allow a decision on the acceptability of the remedial strategy as an interim corrective action prior to permit application approval. The proposed interim phase of the remediation program will position two horizontal bioremediation wells such that the respective zones of influence will intersect the migration path for the highest concentrations of each plume.« less

  2. An Interim Report on the Student Support Services Program: 2002-03 and 2003-04, with Select Data from 1998-2002

    ERIC Educational Resources Information Center

    Zhang, Yu; Chan, Tsze

    2007-01-01

    This report describes essential characteristics and key program outcome measures for the Student Support Services (SSS) program grantees and participants in reporting years 2002-03 and 2003-04. The SSS program is designed to increase college persistence and graduation rates for eligible students, increase the transfer rates of eligible students…

  3. An Interim Report on the Educational Opportunity Centers Program: 2002-03 and 2003-04, with Select Data from 2000-02

    ERIC Educational Resources Information Center

    Hale, Margaret Marcus; Chan, Tsze

    2006-01-01

    Created in 1972, the Educational Opportunity Centers (EOC) Program, one of eight TRIO Programs, funds EOC projects at two- and four-year colleges and universities and public or private agencies or organizations to assist adults from disadvantaged backgrounds to enter or continue a postsecondary education program. Participants in EOC projects…

  4. 75 FR 30113 - Rural Microentrepreneur Assistance Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... government levels. Regulatory Flexibility Act This interim rule has been reviewed with regard to the... efforts to build the capacity of the microenterprise development industry to achieve new levels of... loan program level and legislative intent in the USDA FY 2010 appropriations bill. If this information...

  5. 75 FR 6839 - Technical Service Provider Assistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-12

    ... Executive Order 12866, the Office of Management and Budget determined that this final rule is not a... or are eligible to participate in conservation programs to help them make land management decisions...: Covered Programs. The interim final rule incorporated reference to the Agricultural Management Assistance...

  6. 16 CFR 1209.33 - Reasonable testing program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 1209.33 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.33 Reasonable testing program. (a) General. Section 14(a) of the Consumer Product Safety Act (15 U.S.C. 2063(a)) requires each manufacturer...

  7. IVHS Countermeasures For Rear-End Collisions, Task 1 Volume V: 1985 Nass Case Analysis, Interim Report

    DOT National Transportation Integrated Search

    1994-02-01

    THE ATTACHED REPORT IS FROM THE NHTSA SPONSORED PROGRAM, "IVHS COUNTERMEASURES FOR REAR-END COLLISIONS," CONTRACT #DTNH22-93-C-07326. THE PROGRAM'S PRIMARY OBJECTIVE IS TO DEVELOP PRACTICAL PERFORMANCE GUIDELINES OR SPECIFICATIONS FOR REAR-END COLLIS...

  8. 76 FR 70639 - Agricultural Career and Employment Grants Program; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ... DEPARTMENT OF AGRICULTURE Office of Advocacy and Outreach 7 CFR Part 2502 RIN 0503-AA49 Agricultural Career and Employment Grants Program; Correction AGENCY: Office of Advocacy and Outreach, Departmental Management, USDA. ACTION: Interim rule with request for comments; correction. SUMMARY: On November...

  9. Testimony of Nationally Representative Groups. U.S. Metric Study Interim Report.

    ERIC Educational Resources Information Center

    National Bureau of Standards (DOC), Washington, DC.

    As the 12th in a series of interim reports prepared for the United States Congress on the metric system, this study was authorized by law to reduce uncertainties concerning the issue of converting to metrication and to provide a better basis upon which the Congress may evaluate and resolve it. The testimony of over 230 nationally representative…

  10. Federal Government: Civilian Agencies. U.S. Metric Study Interim Report.

    ERIC Educational Resources Information Center

    National Bureau of Standards (DOC), Washington, DC.

    This second interim report on the feasibility of a United States changeover to a metric system stems from the U.S. Metric Study, which was authorized by Public Law 90-472, and was prepared by the National Bureau of Standards to provide a better basis for Congressional evaluation of this issue. Participating in this national survey were 55 federal…

  11. Integrated Occupational Program: Information Manual for Administrators, Counsellors, and Teachers. Interim 1988.

    ERIC Educational Resources Information Center

    Forest, Jan

    The Integrated Occupational Program (IOP) was designed for students in grades 8-12 who have experienced prolonged difficulty with the regular elementary and secondary school programs, who demonstrate a significant lag in one or more of their academic courses, and who typically fall into the intelligence band of 75-95 IQ. The IOP enables students…

  12. Work Experience Program Teacher Resource Manual. Junior and Senior High School. Interim Edition.

    ERIC Educational Resources Information Center

    Gullekson, Dale

    This manual has been prepared to help educators in Alberta, Canada, organize and operate a work experience program that provides meaningful learning experiences for junior and senior high school students in partnership with the community. The manual: (1) outlines the expectations of the work experience program, including benefits to students,…

  13. Harvard University Program on Technology and Society 1964-1972. A Final Review.

    ERIC Educational Resources Information Center

    Harvard Univ., Cambridge, MA. Program on Technology and Society.

    Eight years of research by the Harvard University's Program on Technology and Society are summarized. Lengthy abstracts of the 29 books and 164 articles that resulted from the Program, as well as interim accounts of projects not yet completed are presented. The report is divided into four parts; institutions (including business, education, and…

  14. 76 FR 59574 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug Testing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-27

    ... 2105-AE13 Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug...) published an interim final rule (IFR) authorizing the use of a new Federal Drug Testing Custody and Control Form (CCF) in its drug testing program. Use of the form is authorized beginning October 1, 2010. This...

  15. International validation study for interim PET in ABVD-treated, advanced-stage hodgkin lymphoma: interpretation criteria and concordance rate among reviewers.

    PubMed

    Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane; Hutchings, Martin; Kostakoglu, Lale; Gregianin, Michele; Meignan, Michel; Malkowski, Bogdan; Hofman, Michael S; Barrington, Sally F

    2013-05-01

    At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score. This paper focuses on the criteria for interpretation of interim PET and on concordance rates. A cohort of advanced-stage Hodgkin lymphoma patients treated with doxorubicin, bleomycin, vinblastine, and dacarbazine (ABVD) were enrolled retrospectively from centers worldwide. Baseline and interim scans were reviewed by an international panel of 6 nuclear medicine experts using the 5-point score. Complete scan datasets of acceptable diagnostic quality were available for 260 of 440 (59%) enrolled patients. Independent agreement among reviewers was reached on 252 of 260 patients (97%), for whom at least 4 reviewers agreed the findings were negative (score of 1-3) or positive (score of 4-5). After discussion, consensus was reached in all cases. There were 45 of 260 patients (17%) with positive interim PET findings and 215 of 260 patients (83%) with negative interim PET findings. Thirty-three interim PET-positive scans were true-positive, and 12 were false-positive. Two hundred three interim PET-negative scans were true-negative, and 12 were false-negative. Sensitivity, specificity, and accuracy were 0.73, 0.94, and 0.91, respectively. Negative predictive value and positive predictive value were 0.94 and 0.73, respectively. The 3-y failure-free survival was 83%, 28%, and 95% for the entire population and for interim PET-positive and -negative patients, respectively (P < 0.0001). The agreement between pairs of reviewers was good or very good, ranging from 0.69 to 0.84 as measured with the Cohen kappa. Overall agreement was good at 0.76 as measured with the Krippendorf α. The 5-point score proposed at Deauville for reviewing interim PET scans in advanced Hodgkin lymphoma is accurate and reproducible enough to be accepted as a standard reporting criterion in clinical practice and for clinical trials.

  16. LEVERAGING AGING MATERIALS DATA TO SUPPORT EXTENSION OF TRANSPORTATION SHIPPING PACKAGES SERVICE LIFE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunn, K.; Bellamy, S.; Daugherty, W.

    Nuclear material inventories are increasingly being transferred to interim storage locations where they may reside for extended periods of time. Use of a shipping package to store nuclear materials after the transfer has become more common for a variety of reasons. Shipping packages are robust and have a qualified pedigree for performance in normal operation and accident conditions but are only certified over an approved transportation window. The continued use of shipping packages to contain nuclear material during interim storage will result in reduced overall costs and reduced exposure to workers. However, the shipping package materials of construction must maintainmore » integrity as specified by the safety basis of the storage facility throughout the storage period, which is typically well beyond the certified transportation window. In many ways, the certification processes required for interim storage of nuclear materials in shipping packages is similar to life extension programs required for dry cask storage systems for commercial nuclear fuels. The storage of spent nuclear fuel in dry cask storage systems is federally-regulated, and over 1500 individual dry casks have been in successful service up to 20 years in the US. The uncertainty in final disposition will likely require extended storage of this fuel well beyond initial license periods and perhaps multiple re-licenses may be needed. Thus, both the shipping packages and the dry cask storage systems require materials integrity assessments and assurance of continued satisfactory materials performance over times not considered in the original evaluation processes. Test programs for the shipping packages have been established to obtain aging data on materials of construction to demonstrate continued system integrity. The collective data may be coupled with similar data for the dry cask storage systems and used to support extending the service life of shipping packages in both transportation and storage.« less

  17. Maywood Interim Storage Site annual environmental report for calendar year 1991, Maywood, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includesmore » sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less

  18. Medicare program; FY 2014 inpatient prospective payment systems: changes to certain cost reporting procedures related to disproportionate share hospital uncompensated care payments. Interim final rule with comment period.

    PubMed

    2013-10-03

    : In the fiscal year (FY) 2014 inpatient prospective payment systems (IPPS)/long-term care hospital (LTCH) PPS final rule, we established the methodology for determining the amount of uncompensated care payments made to hospitals eligible for the disproportionate share hospital (DSH) payment adjustment in FY 2014 and a process for making interim and final payments. This interim final rule with comment period revises certain operational considerations for hospitals with Medicare cost reporting periods that span more than one Federal fiscal year and also makes changes to the data that will be used in the uncompensated care payment calculation in order to ensure that data from Indian Health Service (IHS) hospitals are included in Factor 1 and Factor 3 of that calculation.

  19. 78 FR 79567 - Supplemental Nutrition Assistance Program: Trafficking Controls and Fraud Investigations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-31

    ... DEPARTMENT OF AGRICULTURE Food and Nutrition Service 7 CFR Parts 271 and 274 RIN 0584-AE26 Supplemental Nutrition Assistance Program: Trafficking Controls and Fraud Investigations AGENCY: Food and Nutrition Service, USDA. ACTION: Final rule, Interim final rule; notice of approval of Information...

  20. IVHS Countermeasures For Rear-End Collisions, Task 1 Volume Iii: 1991 Nass Cds Case Analysis, Interim Report

    DOT National Transportation Integrated Search

    1994-02-01

    THE ATTACHED REPORT IS FROM THE NHTSA SPONSORED PROGRAM, "IVHS COUNTERMEASURES FOR REAR-END COLLISIONS," CONTRACT #DTNH22-93-C-07326. THE PROGRAM'S PRIMARY OBJECTIVE IS TO DEVELOP PRACTICAL PERFORMANCE GUIDELINES OR SPECIFICATIONS FOR REAR-END COLLIS...

  1. 76 FR 41411 - West Virginia Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-14

    ... of Environmental Protection (WVDEP). The interim rule provided an opportunity for public comment and... 30 CFR Part 948 Intergovernmental relations, Surface mining, Underground mining. Dated: July 5, 2011...

  2. Evaluation Influence: The Evaluation Event and Capital Flow in International Development.

    PubMed

    Bell, David A

    2017-12-01

    Assessing program effectiveness in human development is central to informing foreign aid policy-making and organizational learning. Foreign aid effectiveness discussions have increasingly given attention to the devaluing effects of aid flow volatility. This study reveals that the external evaluation event influences actor behavior, serving as a volatility-constraining tool. A case study of a multidonor aid development mechanism served examining the influence of an evaluation event when considering anticipatory effects. The qualitative component used text and focus group data combined with individual interview data (organizations n = 10, including 26 individuals). Quantitative data included financial information on all 75 capital investments. The integrated theory of influence and model of alternative mechanisms used these components to identify the linkage between the evaluation event and capital flow volatility. Aid approved in the year of the midterm evaluation was disbursed by the mechanism with low capital volatility. Anticipating the evaluation event influenced behavior resulting in an empirical record that program outcomes were enhanced and the mechanism was an improved organization. Formative evaluations in a development program can trigger activity as an interim process. That activity provides for a more robust assessment of ultimate consequence of interest. Anticipating an evaluation can stimulate donor reality testing. The findings inform and strengthen future research on the influence of anticipating an evaluation. Closely examining activities before, during, and shortly after the evaluation event can aid development of other systematic methods to improve understanding this phenomenon, as well as improve donor effectiveness strategies.

  3. Deep Vadose Zone Treatability Test for the Hanford Central Plateau. Interim Post-Desiccation Monitoring Results, Fiscal Year 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Truex, Michael J.; Strickland, Christopher E.; Oostrom, Martinus

    A field test of desiccation is being conducted as an element of the Deep Vadose Zone Treatability Test Program. The active desiccation portion of the test has been completed. Monitoring data have been collected at the field test site during the post-desiccation period and are reported herein. This is an interim data summary report that includes about 4 years of post-desiccation monitoring data. The DOE field test plan proscribes a total of 5 years of post-desiccation monitoring.

  4. Interim Report on the Truancy Court Diversion Program in the District of Columbia, 2011-12

    ERIC Educational Resources Information Center

    Cahill, Meagan; Liberman, Akiva; Cramer, Lindsey

    2012-01-01

    The Truancy Court Diversion Program (TCDP) is a voluntary program for at risk students and their parents. It combines involvement of a Family Court judge in group and individual sessions with service provision. During the 2011-12 school year, a pilot TCDP was implemented at Kramer Middle School (M.S.) and at Johnson M.S. The program attempts to…

  5. Federal Early Childhood Programs: A Description and Analysis of Research, Child Care, State Grant and Teacher Training Programs Pertaining to Young Children. Interim Report.

    ERIC Educational Resources Information Center

    Searcy, Ellen Ouhl

    The main objectives of this report about the Federal effort in early learning research are to assist the National Program on Early Childhood Education (NPECE) in planning its research and development program, to identify predicted "popular" areas of research for the future, and to identify possible NPECE funding sources. The report…

  6. Quantifying the bias in the estimated treatment effect in randomized trials having interim analyses and a rule for early stopping for futility.

    PubMed

    Walter, S D; Han, H; Briel, M; Guyatt, G H

    2017-04-30

    In this paper, we consider the potential bias in the estimated treatment effect obtained from clinical trials, the protocols of which include the possibility of interim analyses and an early termination of the study for reasons of futility. In particular, by considering the conditional power at an interim analysis, we derive analytic expressions for various parameters of interest: (i) the underestimation or overestimation of the treatment effect in studies that stop for futility; (ii) the impact of the interim analyses on the estimation of treatment effect in studies that are completed, i.e. that do not stop for futility; (iii) the overall estimation bias in the estimated treatment effect in a single study with such a stopping rule; and (iv) the probability of stopping at an interim analysis. We evaluate these general expressions numerically for typical trial scenarios. Results show that the parameters of interest depend on a number of factors, including the true underlying treatment effect, the difference that the trial is designed to detect, the study power, the number of planned interim analyses and what assumption is made about future data to be observed after an interim analysis. Because the probability of stopping early is small for many practical situations, the overall bias is often small, but a more serious issue is the potential for substantial underestimation of the treatment effect in studies that actually stop for futility. We also consider these ideas using data from an illustrative trial that did stop for futility at an interim analysis. Copyright © 2017 John Wiley & Sons, Ltd. Copyright © 2017 John Wiley & Sons, Ltd.

  7. Antimicrobial Exposure Assessment Task Force II (AEATF II) Volume 5: Governing Document for a Multi-Year Antimicrobial Chemical Exposure Monitoring Program (interim draft document)

    EPA Pesticide Factsheets

    Describes the overall scope of the AEATF II program, demonstrates the need for additional human exposure monitoring data and explains the proposed methodology for the exposure monitoring studies proposed for conduct by the AEATF II.

  8. 77 FR 19525 - National School Lunch Program: School Food Service Account Revenue Amendments Related to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-02

    ... National School Lunch Program: School Food Service Account Revenue Amendments Related to the Healthy, Hunger-Free Kids Act of 2010; Approval of Information Collection Request AGENCY: Food and Nutrition Service, USDA. ACTION: Interim final rule; approval of information collection request. SUMMARY: The Food...

  9. Satellite Academies Program: Interim Report.

    ERIC Educational Resources Information Center

    Center for Urban Education, New York, NY.

    The Satellite Academies Program (SAP) is considered to have the following central goals: (1) to improve basic academic skills, (2) to provide meaningful work experience, (3) to develop a job-related educational curriculum, (4) to involve the business community in education, (5) to increase student involvement in the educational process, and (6) to…

  10. 78 FR 57137 - Energy Efficiency Program for Industrial Equipment: Interim Determination Classifying UL...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-17

    ... Verification Services Inc. as a Nationally Recognized Certification Program for Small Electric Motors AGENCY... conservation requirements for, among other things, electric motors and small electric motors, including test...\\ Section 345(c) of EPCA directs the Secretary of Energy to require manufacturers of electric motors ``to...

  11. Second Interim Report of the Broadly-Based Community Study of Exceptional Education.

    ERIC Educational Resources Information Center

    Milwaukee Public Schools, WI. Div. of Curriculum and Instruction.

    Presented are recommendations of a Milwaukee public school study for the purpose of providing a meaningful, effective, and comprehensive educational program for exceptional students. Fourteen recommendations covering the broad policy of exceptional education include policies on integration into normal school programs, transportation, and early…

  12. 78 FR 26504 - Women-Owned Small Business Federal Contract Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-07

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 127 RIN 3245-AG55 Women-Owned Small Business Federal Contract Program AGENCY: U.S. Small Business Administration. ACTION: Interim final rule. SUMMARY: The U.S. Small Business Administration (SBA) is amending its regulations to implement Section 1697 of the...

  13. 40 CFR 52.241 - Interim approval of enhanced inspection and maintenance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California... Act (Pub. L. 104-59), the California SIP is approved as meeting the provisions of section 182(c)(3.... (a) [Reserved] (b) Approval. On June 5, 2009, the California Air Resources Board submitted a revision...

  14. Comprehensive Child Development Program--A National Family Support Demonstration. Interim Report to Congress.

    ERIC Educational Resources Information Center

    Administration for Children, Youth, and Families (DHHS), Washington, DC. Head Start Bureau.

    The Comprehensive Child Development Program (CCDP), enacted by Congress in 1988, provides intensive, comprehensive, integrated, and continuous support to preschool children from low-income families to enhance their intellectual, social, and physical development. It also provides needed services to parents and household family members to enhance…

  15. The Development of a Vocational Diagnostic Program. Interim Report.

    ERIC Educational Resources Information Center

    Barnard, William W.

    A five-phased project is described which was designed to develop more specific diagnostic procedures and instrumentation that would allow both the vocational counselor and the prospective student to determine more effectively specific occupational programs and occupational objectives for education at the postsecondary level. Phases of the project…

  16. 34 CFR 668.58 - Interim disbursements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... in accordance with § 668.59(a), the institution may not— (i) Disburse any Federal Pell Grant, FSEOG... the applicant in its FWS Program; or (iii) Originate a Direct Subsidized Loan, or disburse any such..., under the FWS Program for the first 60 consecutive days after the student's enrollment in that award...

  17. 34 CFR 668.58 - Interim disbursements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... in accordance with § 668.59(a), the institution may not— (i) Disburse any Federal Pell Grant, FSEOG... the applicant in its FWS Program; or (iii) Originate a Direct Subsidized Loan, or disburse any such..., under the FWS Program for the first 60 consecutive days after the student's enrollment in that award...

  18. 34 CFR 668.58 - Interim disbursements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... in accordance with § 668.59(a), the institution may not— (i) Disburse any Federal Pell Grant, FSEOG... the applicant in its FWS Program; or (iii) Originate a Direct Subsidized Loan, or disburse any such..., under the FWS Program for the first 60 consecutive days after the student's enrollment in that award...

  19. 77 FR 33662 - Structure and Practices of the Video Relay Service Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-07

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 10-51; FCC 11-118] Structure and Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Correcting amendments. SUMMARY: This document contains a correction to the interim regulations of the Commission's rules...

  20. Interim user's manual for boundary layer integral matrix procedure, version J

    NASA Technical Reports Server (NTRS)

    Evans, R. M.; Morse, H. L.

    1974-01-01

    A computer program for analyzing two dimensional and axisymmetric nozzle performance with a variety of wall boundary conditions is described. The program has been developed for application to rocket nozzle problems. Several aids to usage of the program and two auxiliary subroutines are provided. Some features of the output are described and three sample cases are included.

  1. Childhood Obesity: Concept, Feasibility, and Interim Results of a Local Group-Based, Long-Term Treatment Program

    ERIC Educational Resources Information Center

    Weigel, Corina; Kokocinski, Kathrin; Lederer, Peter; Dotsch, Jorg; Rascher, Wolfgang; Knerr, Ina

    2008-01-01

    Objective: The authors performed a group-based program for obese children and adolescents in Bavaria, Germany to enable them to establish a health-oriented lifestyle and to reduce overweight. The authors compared this program with a control approach based on the patients' own initiative. Design: This is a controlled clinical trial. Setting: A…

  2. National Program Plan for Research and Development in Solar Heating and Cooling. Interim Report.

    ERIC Educational Resources Information Center

    Energy Research and Development Administration, Washington, DC. Div. of Solar Energy.

    This report presents the Energy Research and Development Administration (ERDA) program plan for solar heating and cooling of buildings and for agricultural and industrial process applications. An overview of the program plan is followed by a description of the ten paths to the solar heating and cooling of buildings and a brief discussion of the…

  3. A Guide for Planning Facilities for Occupational Preparation Programs in the Machine Trades. Interim Report. Research 24.

    ERIC Educational Resources Information Center

    Larson, Milton E.

    This guide is designed for use by any person or groups of persons responsible for planning occupational programs in the machine trades. Its major purpose is to elicit the necessary information for the writing of educational specifications for facilities to house needed vocational programs in machine tool operation, machine shop, and tool and die…

  4. Hazelwood Interim Storage Site annual environmental report for calendar year 1991, Hazelwood, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of themore » nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.« less

  5. 24 CFR 884.109 - Rent adjustments.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES... will be determined by HUD at least annually; interim revisions may be made as market conditions warrant...

  6. Medicare program; changes to the Medicare claims appeal procedures; continuation of effectiveness and extension of timeline for publication of final rule. Interim final rule with comment period; continuation of effectiveness and extension of timeline for publication of final rule.

    PubMed

    2009-02-27

    This notice announces the continuation of effectiveness of a Medicare interim final rule with comment period and the extension of the timeline for publication of the final rule. This notice is issued in accordance with section 1871(a)(3)(C) of the Social Security Act (the Act), which allows an interim final rule to remain in effect after the expiration of the timeline specified in section 1871(a)(3)(B) of the Act (the "regular timeline") or, if applicable, at the end of each succeeding 1-year extension to the regular timeline, if prior to the expiration of the timeline, the Secretary publishes in the Federal Register a notice of continuation and explains why the regular timeline or any subsequent extension was not complied with.

  7. Health information technology: initial set of standards, implementation specifications, and certification criteria for electronic health record technology. Interim final rule.

    PubMed

    2010-01-13

    The Department of Health and Human Services (HHS) is issuing this interim final rule with a request for comments to adopt an initial set of standards, implementation specifications, and certification criteria, as required by section 3004(b)(1) of the Public Health Service Act. This interim final rule represents the first step in an incremental approach to adopting standards, implementation specifications, and certification criteria to enhance the interoperability, functionality, utility, and security of health information technology and to support its meaningful use. The certification criteria adopted in this initial set establish the capabilities and related standards that certified electronic health record (EHR) technology will need to include in order to, at a minimum, support the achievement of the proposed meaningful use Stage 1 (beginning in 2011) by eligible professionals and eligible hospitals under the Medicare and Medicaid EHR Incentive Programs.

  8. DI: An interactive debugging interpreter for applicative languages

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Skedzielewski, S.K.; Yates, R.K.; Oldehoeft, R.R.

    1987-03-12

    The DI interpreter is both a debugger and interpreter of SISLAL programs. Its use as a program interpreter is only a small part of its role; it is designed to be a tool for studying compilation techniques for applicative languages. DI interprets dataflow graphs expressed in the IF1 and IF2 languages, and is heavily instrumented to report the activity of dynamic storage activity, reference counting, copying and updating of structured data values. It also aids the SISAL language evaluation by providing an interim execution vehicle for SISAL programs. DI provides determinate, sequential interpretation of graph nodes for sequential and parallelmore » operations in a canonical order. As a debugging aid, DI allows tracing, breakpointing, and interactive display of program data values. DI handles creation of SISAL and IF1 error values for each data type and propagates them according to a well-defined algebra. We have begun to implement IF1 optimizers and have measured the improvements with DI.« less

  9. On condition evaluation of axle unit bearings of wheel pair

    NASA Astrophysics Data System (ADS)

    Glotov, V. V.; Romashchenko, M. A.; Ostroumov, I. V.; Kondratiev, Il V.

    2018-03-01

    At present, axle units of freight cars undergo a complete checkup with disassembling and visual inspection of the bearing parts every five years. During an annual interim checkup, external inspection of an axle box with removed cap is carried out and the lubricant condition is checked. The state of the rolling surfaces of bearings during an interim checkup should be assessed using the known methods of nondestructive testing.

  10. Engineering report single-shell tank farms interim measures to limit infiltration through the vadose zone

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HAASS, C.C.

    1999-10-14

    Identifies, evaluates and recommends interim measures for reducing or eliminating water sources and preferential pathways within the vadose zone of the single-shell tank farms. Features studied: surface water infiltration and leaking water lines that provide recharge moisture, and wells that could provide pathways for contaminant migration. An extensive data base, maps, recommended mitigations, and rough order of magnitude costs are included.

  11. A Case Study in Citizen Science: The Effectiveness of a Trap-Neuter-Return Program in a Chicago Neighborhood.

    PubMed

    Spehar, Daniel D; Wolf, Peter J

    2018-01-18

    The use of trap-neuter-return (TNR) as a method of managing free-roaming cat populations has increased in the United States in recent decades. Historically, TNR has been conducted most often at a grassroots level, which has led to inconsistent data collection and assessment practices. Consequently, a paucity of analyzable data exists. An initiative is underway to standardize TNR program data collection and assessment. However, it could be some time before scientifically sound protocols are implemented on a broad scale. In the interim, sets of data collected by nascent citizen scientists offer valid opportunities to evaluate grassroots TNR programs. The purpose of the present study was to examine the effectiveness of a TNR program conducted by a citizen scientist located in Chicago, Illinois, where a county law permitting TNR was enacted in 2007. Colony populations, when grouped by the number of years enrolled in the program, declined by a mean of 54% from entry and 82% from peak levels. Results from coexistent TNR programs in the Chicago area are consistent with these findings.

  12. Mourning dove hunting regulation strategy based on annual harvest statistics and banding data

    USGS Publications Warehouse

    Otis, D.L.

    2006-01-01

    Although managers should strive to base game bird harvest management strategies on mechanistic population models, monitoring programs required to build and continuously update these models may not be in place. Alternatively, If estimates of total harvest and harvest rates are available, then population estimates derived from these harvest data can serve as the basis for making hunting regulation decisions based on population growth rates derived from these estimates. I present a statistically rigorous approach for regulation decision-making using a hypothesis-testing framework and an assumed framework of 3 hunting regulation alternatives. I illustrate and evaluate the technique with historical data on the mid-continent mallard (Anas platyrhynchos) population. I evaluate the statistical properties of the hypothesis-testing framework using the best available data on mourning doves (Zenaida macroura). I use these results to discuss practical implementation of the technique as an interim harvest strategy for mourning doves until reliable mechanistic population models and associated monitoring programs are developed.

  13. 76 FR 63151 - Small Business Jobs Act: 504 Loan Program Debt Refinancing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-12

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 120 RIN 3245-AG17 Small Business Jobs Act: 504 Loan Program Debt Refinancing AGENCY: U.S. Small Business Administration. ACTION: Final rule. SUMMARY: This rule finalizes the interim final rule that implemented section 1122 of the Small Business Jobs Act of...

  14. Antimicrobial Exposure Assessment Task Force II (AEATF II) Volume 5: Governing Document for a Multi-Year Antimicrobial Chemical Exposure Monitoring Program (interim draft document with changes)

    EPA Pesticide Factsheets

    This document describes the overall scope of the AEATF II program, demonstrates the need for additional human exposure monitoring data and explains the proposed methodology for the exposure monitoring studies proposed for conduct by the AEATF II.

  15. Creating a Platform for Sustained Neighborhood Improvement: Interim Findings from Chicago's New Communities Program

    ERIC Educational Resources Information Center

    Greenberg, David; Verma, Nandita; Dillman, Keri-Nicole; Chaskin, Robert

    2010-01-01

    Distressed urban neighborhoods face challenges on multiple fronts, but most efforts to confront these problems work in isolation of one another. The New Communities Program (NCP) is an exception, helping selected Chicago neighborhoods develop partnerships to address challenges involving employment, education, housing, and safety in a…

  16. 76 FR 11506 - Fisheries and Habitat Conservation and Migratory Birds Programs; Draft Land-Based Wind Energy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ...] RIN 1018-AX45 Fisheries and Habitat Conservation and Migratory Birds Programs; Draft Land-Based Wind... Register on February 18, 2011, announcing the availability for public comment of draft Land-Based Wind... Guidelines are intended to supersede the Service's 2003 voluntary, interim guidelines for land-based wind...

  17. Upward Bound Math-Science: Program Description and Interim Impact Estimates

    ERIC Educational Resources Information Center

    Olsen, Robert; Seftor, Neil; Silva, Tim; Myers, David; DesRoches, David; Young, Julie

    2007-01-01

    To help address continuing disparities in academic achievement and under-representation of disadvantaged groups in math and science majors and careers, the U.S. Department of Education (ED) established a math and science initiative in 1990 within Upward Bound, a federal grant program known as Upward Bound Math-Science (UBMS) designed to provide…

  18. Federal Programs Supporting Educational Change, Vol. 2: Factors Affecting Change Agent Projects.

    ERIC Educational Resources Information Center

    Berman, Paul; Pauly, Edward W.

    This second volume in the change-agent series reports the interim results of an exploratory statistical analysis of a survey of a nationwide sample of 293 change-agent projects funded by four federal demonstration programs--Elementary Secondary Education Act (ESEA) Title III, Innovative Projects; ESEA Title VII, Bilingual Projects; Vocational…

  19. 76 FR 72332 - Energy Conservation Program: Test Procedure for Microwave Ovens

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-23

    ... Energy Conservation Program: Test Procedure for Microwave Ovens AGENCY: Office of Energy Efficiency and.... Department of Energy (DOE) published an interim final rule on March 9, 2011, amending its test procedures for... standby mode and off mode power use by microwave ovens. Those amendments incorporated into the DOE test...

  20. From the Bottom Up: Toward a Strategy for Income and Employment Generation among the Disadvantaged. An Interim Report.

    ERIC Educational Resources Information Center

    O'Regan, Fred; Conway, Maureen

    The Aspen Institute's ongoing action-research program, Local Employment Approaches for the Disadvantaged (LEAD), assessed 60 programs nationally. Local initiatives fell into four general categories, with numerous subcategories: self-employment, job training and placement, job creation and retention, and community-based finance. A second breakdown…

  1. 40 CFR 96.284 - Opt-in process.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR SO2 Opt-in Units... of interim review, if the plan appears to contain information demonstrating that the SO2 emissions... section, the owner or operator shall monitor and report the SO2 emissions rate and the heat input of the...

  2. EPA issues interim final waste minimization guidance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bergeson, L.L.

    1993-08-01

    The U.S. Environmental Protection Agency (EPA) has released a new and detailed interim final guidance to assist hazardous waste generators in certifying they have a waste minimization program in place under the Resource Conservation and Recovery Act (RCRA). EPA's guidance identifies the basic elements of a waste minimization program in place that, if present, will allow people to certify they have implemented a program to reduce the volume and toxicity of hazardous waste to the extent economically practical. The guidance is directly applicable to generators of 1000 or more kilograms per month of hazardous waste, or large-quantity generators, and tomore » owners and operators of hazardous waste treatment, storage or disposal facilities who manage their own hazardous waste on site. Small-quantity generators that generate more than 100 kilograms, but less than 1,000 kilograms, per month of hazardous waste are not subject to the same program in place certification requirement. Rather, they must certify on their manifests that they have made a good faith effort to minimize their waste generation.« less

  3. DEVELOPMENT OF IMPROVED FABRICATION METHODS, PROCESS AND TECHNIQUES FOR PRODUCING TYPICAL AIRCRAFT SHAPES FROM BERYLLIUM. Interim Technical Documentary Progress Report for the Period ending October 31, 1962

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jenkins, R.G.; Siergiej, J.M.

    1962-12-28

    In a program to develop a complete manufacturing process for ihe production of beryllium channels, techniques are being sought for drawing to obtain a flnal product meeting specifications more rigorous than are obtainable by direct extrusion. Progress in designing and procuring the special tooling required to draw complex shapes at elevated temperature is described, and the flrst set of draw dies is evaluated with respect to design and quality. Three experimental draw attempts have been made on U-channels, in addition to draw tests on flats. (auth)

  4. IVHS Architecture Development Program, Interim Status Report

    DOT National Transportation Integrated Search

    1994-04-01

    A MAJOR NATIONAL INITIATIVE IS UNDERWAY TO APPLY PROVEN INFORMATION, COMMUNICATIONS AND CONTROL TECHNOLOGIES TO SURFACE TRANSPORTATION TO IMPROVE ITS EFFICIENCY AND REDUCE ITS NEGATIVE IMPACTS. COLLECTIVELY, THESE APPLICATIONS ARE KNOWN AS INTELLIGEN...

  5. Shared-Time Concept for Area Vocational Education Programs. Community Factors. Interim Report, Part 1 of a Four-Part Series.

    ERIC Educational Resources Information Center

    Meaders, O. Donald, Ed.; Ekpo-ufot, Abel, Ed.

    The Shared-Time Concept project was one of several projects conducted under a grant for a developmental vocational education research and teacher education program based on a clinical school concept. The objectives were (1) to determine the extent and nature of use of shared-time concept for conducting vocational education programs, and (2) to…

  6. World Trade Center Health Program; Amendments to Definitions, Appeals, and Other Requirements. Final rule.

    PubMed

    2016-12-15

    In 2011 and 2012, the Secretary, Department of Health and Human Services (HHS), promulgated regulations designed to govern the World Trade Center (WTC) Health Program (Program), including the processes by which eligible responders and survivors may apply for enrollment in the Program, obtain health monitoring and treatment for WTC-related health conditions, and appeal enrollment and treatment decisions, as well as a process to add new conditions to the List of WTC-Related Health Conditions (List). After using the regulations for a number of years, the Administrator of the WTC Health Program identified potential improvements to certain existing provisions, including, but not limited to, appeals of enrollment, certification, and treatment decisions, as well as the procedures for the addition of health conditions for WTC Health Program coverage. He also identified the need to add new regulatory provisions, including, but not limited to, standards for the disenrollment of a WTC Health Program member and decertification of a certified WTC-related health condition. A notice of proposed rulemaking was published on August 17, 2016; this action addresses public comments received on that proposed rulemaking, as well as three interim final rules promulgated since 2011, and finalizes the proposed rule and three interim final rules.

  7. 78 FR 55339 - Regulatory Capital Rules: Regulatory Capital, Implementation of Basel III, Capital Adequacy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ...The Federal Deposit Insurance Corporation (FDIC) is adopting an interim final rule that revises its risk-based and leverage capital requirements for FDIC-supervised institutions. This interim final rule is substantially identical to a joint final rule issued by the Office of the Comptroller of the Currency (OCC) and the Board of Governors of the Federal Reserve System (Federal Reserve) (together, with the FDIC, the agencies). The interim final rule consolidates three separate notices of proposed rulemaking that the agencies jointly published in the Federal Register on August 30, 2012, with selected changes. The interim final rule implements a revised definition of regulatory capital, a new common equity tier 1 minimum capital requirement, a higher minimum tier 1 capital requirement, and, for FDIC-supervised institutions subject to the advanced approaches risk-based capital rules, a supplementary leverage ratio that incorporates a broader set of exposures in the denominator. The interim final rule incorporates these new requirements into the FDIC's prompt corrective action (PCA) framework. In addition, the interim final rule establishes limits on FDIC-supervised institutions' capital distributions and certain discretionary bonus payments if the FDIC-supervised institution does not hold a specified amount of common equity tier 1 capital in addition to the amount necessary to meet its minimum risk-based capital requirements. The interim final rule amends the methodologies for determining risk-weighted assets for all FDIC-supervised institutions. The interim final rule also adopts changes to the FDIC's regulatory capital requirements that meet the requirements of section 171 and section 939A of the Dodd-Frank Wall Street Reform and Consumer Protection Act. The interim final rule also codifies the FDIC's regulatory capital rules, which have previously resided in various appendices to their respective regulations, into a harmonized integrated regulatory framework. In addition, the FDIC is amending the market risk capital rule (market risk rule) to apply to state savings associations. The FDIC is issuing these revisions to its capital regulations as an interim final rule. The FDIC invites comments on the interaction of this rule with other proposed leverage ratio requirements applicable to large, systemically important banking organizations. This interim final rule otherwise contains regulatory text that is identical to the common rule text adopted as a final rule by the Federal Reserve and the OCC. This interim final rule enables the FDIC to proceed on a unified, expedited basis with the other federal banking agencies pending consideration of other issues. Specifically, the FDIC intends to evaluate this interim final rule in the context of the proposed well- capitalized and buffer levels of the supplementary leverage ratio applicable to large, systemically important banking organizations, as described in a separate Notice of Proposed Rulemaking (NPR) published in the Federal Register August 20, 2013. The FDIC is seeking commenters' views on the interaction of this interim final rule with the proposed rule regarding the supplementary leverage ratio for large, systemically important banking organizations.

  8. SWSA 6 interim corrective measures environmental monitoring: FY 1990 results. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashwood, T.L.; Spalding, B.P.

    1991-07-01

    This report presents the results and conclusions from a multifaceted monitoring effort associated with the high-density polyethylene caps installed in Solid Waste Storage Area (SWSA) 6 at Oak Ridge National Laboratory (ORNL) as an interim corrective measure (ICM). The caps were installed between November 1988 and June 1989 to meet Resource Conservation and Recovery Act (RCRA) requirements for closure of those areas of SWSA 6 that had received RCRA-regulated wastes after November 1980. Three separate activities were undertaken to evaluate the performance of the caps: (1) wells were installed in trenches to be covered by the caps, and water levelsmore » in these intratrench wells were monitored periodically; (2) samples were taken of the leachate in the intratrench wells and were analyzed for a broad range of radiological and chemical contaminants; and (3) water levels in wells outside the trenches were monitored periodically. With the exception of the trench leachate sampling, each of these activities spanned the preconstruction, construction, and postconstruction periods. Findings of this study have important implications for the ongoing remedial investigation in SWSA 6 and for the design of other ICMs. 51 figs., 2 tabs.« less

  9. Interim Measures Report for the Headquarters Building Area Location of Concern (LOC) 2E East SWMU 104 John F. Kennedy Space Center, Florida

    NASA Technical Reports Server (NTRS)

    Sager, Eric D.

    2016-01-01

    The Hazardous and Solid Waste Amendment portion of the National Aeronautics and Space Administration (NASA) Resource Conservation and Recovery Act (RCRA) Permit issued by the Florida Department of Environmental Protection (FDEP), requires identification and evaluation of all known Solid Waste Management Units (SWMUs) and Locations of Concern (LOCs) located on Kennedy Space Center (KSC) property. The KSC Headquarters Building Area (KHQA) has been identified as SWMU 104 under KSC's RCRA Program. This report summarizes the Interim Measure (IM) conducted by Geosyntec Consultants (Geosyntec) for NASA under Indefinite Delivery Indefinite Quantity Contract NNK12CA13B at the KHQA to mitigate potential exposure to polychlorinated biphenyl (PCB)-affected media at the eastern side of LOC 2E. The IM activities were conducted in June and July 2015 to remediate PCBs above the FDEP Residential Direct-Exposure (R-) Soil Cleanup Target Level (SCTL) of 0.5 milligram per kilogram (mg/kg) established by Chapter 62-777, Florida Administrative Code. The IM was performed in accordance with the IM Work Plan (IMWP) approved by the FDEP, dated August 2012. IM activities were conducted in accordance with the KSC Generic PCB Work Plan (NASA 2007).

  10. Interim Enforcement Program Response Guidance to Public Data Access Issues

    EPA Pesticide Factsheets

    Written to assist EPA and states when the ECHO web site was launched, this document provides guidance on questions that can arise when compliance and enforcement data are made available to the public.

  11. 76 FR 22802 - Interim Enforcement Policy for Minimum Days Off Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... NRC's fitness for duty regulations and will remain in place until the NRC publishes a revised rule... Code of Federal Regulations, Part 26, ``Fitness for Duty Programs.'' The Commission updated the...

  12. STARPAHC Interim Evaluation Report, May 1975 - April 1976

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The primary goals of the STARPAHC Program are to provide data for developing health care for future manned spacecraft, and to establish the feasibility of the STARPAHC concept for improving the delivery of health care to remote areas on earth. Accordingly, the hardware and medical evaluations initiated during the first 6 months of system operation were continued and expanded during the second 6-month period. The evaluations are based on what has proven to be a relatively stabilized 6-month period wherein system failures which occurred during the initial shakedown period in the first 6 months have been minimized. Early trends and performance data reported in the first semi-annual report were reexamined to either verify, modify or change earlier conclusions. The highlights are given of the total year of operation with emphasis on comparisons between the first and second semi-annual reporting period. In addition, an early analysis of costs is summarized.

  13. Student Assistance General Provisions; Federal Pell Grant Program; Academic Competitiveness Grant Program; and National Science and Mathematics Access to Retain Talent Grant Program. Final Rule. Federal Register, Part IV, Department of Education, 34 CFR Parts 668, 690, and 691

    ERIC Educational Resources Information Center

    National Archives and Records Administration, 2006

    2006-01-01

    The Secretary is adopting as final, with changes, interim final regulations in: 34 CFR part 691 for the Academic Competitiveness Grant (ACG) and National Science and Mathematics Access to Retain Talent Grant (National SMART Grant) programs; 34 CFR part 668 (Student Assistance General Provisions); and 34 CFR part 690 (Federal Pell Grant Program).…

  14. Standards for Agricultural Occupations Programs in Illinois Community Colleges. Interim Report of the Community College Phase [Phase I] of Project RD1-A8-564 Entitled "Standards for Illinois ABAO Post-Secondary Programs and Secondary Programs in Cook County".

    ERIC Educational Resources Information Center

    Walker, Robert W.; Hemp, Paul E.

    A study was made of Phase 1 of the long-term standards program for agricultural occupations programs for Illinois community colleges. The unique feature of this project was the procedure used to maximize the input of community college teachers in the validation and revision of the national standards. Survey instruments were sent to community…

  15. Project Physics Programmed Instruction, Vectors 1.

    ERIC Educational Resources Information Center

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    This programmed instruction booklet is an interim version of instructional materials being developed by Harvard Project Physics. It is the first in a series of three booklets on vectors and covers the definitions of vectors and scalars, drawing vector quantities to scale, and negative vectors. For others in this series, see SE 015 550 and SE 015…

  16. Project Physics Programmed Instruction, Waves 1.

    ERIC Educational Resources Information Center

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    This programmed instruction booklet is an interim version of instructional materials being developed by Harvard Project Physics. It is the first of two booklets on the topic of waves and covers pulses, how pulses travel, and what happens when two pulses pass through the same region at the same time. For the second booklet in this series, see SE…

  17. Occupational Component. 26-Level Courses. Teacher Resource Manual. Integrated Occupational Program. Interim-1991: Curriculum.

    ERIC Educational Resources Information Center

    Alberta Dept. of Education, Edmonton. Curriculum Branch.

    This planning and instructional manual is designed to assist teachers in implementing the 20 10-credit-hour courses that make up the 26-level occupational component of the Integrated Occupational Program (IOP) in Alberta, Canada. (The IOP was developed to assist students who experience difficulties in secondary education and to help students make…

  18. Community Health. Career & Technology Studies. Guide to Standards and Implementation. Interim 1996 (September 1996-September 1997).

    ERIC Educational Resources Information Center

    Alberta Dept. of Education, Edmonton. Curriculum Standards Branch.

    This document contains materials for teachers to use in presenting the community health strand of the career and technology studies (CTS) program that has been approved for secondary schools in Alberta, Canada. The first three sections outline the philosophy/rationale, organization, and curriculum and assessment standards of the CTS program in…

  19. Career Potential Among ROTC Enrollees: A Comparison of 1972 and 1973 Survey Results. Interim Report.

    ERIC Educational Resources Information Center

    Fisher, Allan H., Jr.; And Others

    This document presents the results of a comprehensive 1973 Reserve Officer Training Program (ROTC) survey of enrollment potential and career potential for a variety of college-based military officer training programs. It indicates the extent of career motivation among 1973 enrollees and makes comparisons with a similar survey of 1972 enrollees.…

  20. A Guide for Planning Facilities for Occupational Preparation Programs in Metallurgy Technology. Interim Report. Research 28.

    ERIC Educational Resources Information Center

    German, Carl, Jr.

    The major purpose of this guide is to elicit the information necessary for writing educational specifications for facilities to house technical education programs in metallurgy. It is organized in these parts: (1) Part I discusses the major purpose, underlying assumptions, recent instructional trends, and guiding principles utilized in the…

  1. Smile Alabama! Initiative: Interim Results from a Program To Increase Children's Access to Dental Care.

    ERIC Educational Resources Information Center

    Greene-McIntyre, Mary; Finch, Mary Hayes; Searcy, John

    2003-01-01

    An Alabama initiative aimed to improve access to oral health care for Medicaid-eligible children through four components: improved Medicaid claims processing, increased reimbursement for providers, outreach and educational activities to support providers, and parent and patient education about children's oral health. In the first 3 program years,…

  2. 78 FR 24047 - Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program, Part 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... Employment and Training Administration 20 CFR Part 655 RIN 1205-AB69 Wage Methodology for the Temporary Non-Agricultural Employment H- 2B Program, Part 2 AGENCY: Employment and Training Administration, Labor; U.S. Citizenship and Immigration Services, DHS. ACTION: Interim final rule; request for comments. SUMMARY: The...

  3. Extended-Day Kindergarten versus Half-Day Kindergarten: What One School District Decided.

    ERIC Educational Resources Information Center

    Firlik, Russell

    The New Canaan Public Schools reduced its extended-day (21 hours per week) kindergarten program to half-day sessions (15 hours per week) in an interim program during a 2-year school construction-expansion phase. During a 9-month planning process, an ad hoc committee representing equal membership of teachers and parents from three elementary…

  4. Government-Industry Data Exchange Program (GIDEP) and NASA Advisories

    NASA Technical Reports Server (NTRS)

    Sampson, Michael J.

    2010-01-01

    This viewgraph presentation reviews the Government-Industry Data Exchange Program (GIDEP) and NASA Advisories policy to practice. The contents include: 1) Purpose of the Government-Industry Data Exchange Program (GIDEP); 2) NASA and GSFC Documentation; 3) NASA Advisories, differences from GIDEP; 4) GIDEP Distribution by Originator; 5) New Interim GIDEP Policy for Suspect Counterfeits; 6) NASA and Suspect Counterfeits; 7) Threats to GIDEP; and 8) Conclusions and Contact Information.

  5. Assessing Weapon System Acquisition Cycle Times: Setting Program Schedules

    DTIC Science & Technology

    2015-06-01

    additional research, focused as follows: 1 . Acquisition schedule development: How are schedules for acquisition programs actually set and how are they...the germinating requirements documents specific to systems reviewed. A clear statement was found for only one system (Air and Missile Defense Radar...AMDR) when specific threat capabilities were projected to be operational. • Program schedule setting varies in rigor: 1 Up to the interim version of

  6. Evaluation of Searching and Rescue (SAR) Method For Determining Local Wind Current

    DTIC Science & Technology

    1991-07-01

    JUL 10 1992 ("= Research ajJ Development Centerto 1082 Shennecossett Road . - Groton, CT 06340-6096 INTERIM REPORT July 1991 This document is...United States Coast Guard Research and Development Center 1082 Shennecossett Road Groton, CT 06340-6096 V ’C . l •• mU. Technical Report Documentation...Grant No. 1082 Shennecossett Road Groton, Connecticut 06340-6096 13. Type of Report and Period Covered 12. Sponsoring Agency Name and Address INTERIM

  7. 76 FR 59394 - Energy Conservation Program for Consumer Products: Publication of the Extension of Interim Waiver...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-26

    ... Electronics America, Inc. From the Department of Energy Residential Refrigerator and Refrigerator-Freezer Test... Electronics America, Inc. (Samsung) from energy efficiency test procedure requirements that are applicable to...

  8. Polymer concrete overlay test program : interim report.

    DOT National Transportation Integrated Search

    1974-11-01

    This report describes work done on various combinations of monomers and polymer concrete mixes and identifies the mixes showing the greatest potential for use in bridge deck overlays . Presented are test results showing physical properties of various...

  9. NAVSTAR GPS Simulation and Analysis Program (Interim Report)

    DOT National Transportation Integrated Search

    1983-10-01

    This study assesses the capability of the planned NAVSTAR Global Positioning System (GPS) to meet civil navigation requirements. When it becomes operational in about 1983, NAVSTAR GPS will provide accurate two-dimensional and three-dimensional servic...

  10. NASA/Navy Benchmarking Exchange (NNBE). Volume 1. Interim Report. Navy Submarine Program Safety Assurance

    NASA Technical Reports Server (NTRS)

    2002-01-01

    The NASA/Navy Benchmarking Exchange (NNBE) was undertaken to identify practices and procedures and to share lessons learned in the Navy's submarine and NASA's human space flight programs. The NNBE focus is on safety and mission assurance policies, processes, accountability, and control measures. This report is an interim summary of activity conducted through October 2002, and it coincides with completion of the first phase of a two-phase fact-finding effort.In August 2002, a team was formed, co-chaired by senior representatives from the NASA Office of Safety and Mission Assurance and the NAVSEA 92Q Submarine Safety and Quality Assurance Division. The team closely examined the two elements of submarine safety (SUBSAFE) certification: (1) new design/construction (initial certification) and (2) maintenance and modernization (sustaining certification), with a focus on: (1) Management and Organization, (2) Safety Requirements (technical and administrative), (3) Implementation Processes, (4) Compliance Verification Processes, and (5) Certification Processes.

  11. The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Voegele, Michael D.; Vieth, Donald

    2013-07-01

    The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should bemore » implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste legislation to the floor of the Senate, overcoming existing House support for Yucca Mountain; 3. Change the longstanding focus of Congress from disposal to storage; 4. Change the funding concepts embodied in the Nuclear Waste Policy Act to allow the Nuclear Waste fund to be used to pay for interim storage; 5. Reverse the Congressional policy not to give states or tribes veto or consent authority, and to reserve to Congress the authority to override a state or tribal disapproval; 6. Promulgate interim storage facility siting regulations to reflect the new policies after such changes to policy and law; 7. Complete already underway changes to storage and transportation regulations, possibly incorporating changes to reflect changes to waste disposal law; 8. Promulgate new repository siting regulations if the interim storage facility is to support repository development; 9. Identify volunteer sites, negotiate agreements, and get Congressional approval for negotiated benefits packages; 10. Design, License and develop the interim storage facility. The time required to accomplish these ten items depends on many factors. The estimate developed assumes that certain of the items must be completed before other items are started; given past criticisms of the current program, such an assumption appears appropriate. Estimated times for completion of individual items are based on historical precedent. (authors)« less

  12. Development of a direct education workshop for cervical cancer prevention in high risk women: the Forsyth County project.

    PubMed

    Dignan, M B; Beal, P E; Michielutte, R; Sharp, P C; Daniels, L A; Young, L D

    1990-01-01

    With funding from the National Cancer Institute, a public health education program was developed with the primary objective of increasing the proportion of black women in Forsyth County, North Carolina, who receive Pap smears on a regular basis. This paper reports on the development and implementation of the direct education component of the program. The content of the workshop was based on community analysis of current knowledge, attitudes, and behaviors in the target population, and a review of relevant literature on cervical cancer and the Pap smear. Methods for presentation of the content were refined through three pilot tests. Audiovisual materials were also developed to illustrate key points. The direct education component of the program was designed to function as a short workshop and includes an overview of healthy lifestyles, coverage of the importance of early detection of cancer, a description and discussion of the pelvic exam and the Pap smear, and a discussion of common barriers to obtaining Pap smears on a regular basis. Evaluation of the workshop emphasizes process measures, including a questionnaire to collect demographic information and impressions of the presentation. Interim results of the evaluation are discussed.

  13. Annual report of groundwater monitoring at Centralia, Kansas, in 2010.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.

    In September 2005, periodic sampling of groundwater was initiated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Centralia, Kansas. The sampling at Centralia is performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE). The objective is to monitor levels of carbon tetrachloride contamination identified in the groundwater at Centralia (Argonne 2003, 2004, 2005a). Under the KDHE-approved monitoring plan (Argonne 2005b), the groundwater was sampled twicemore » yearly from September 2005 until September 2007 for analyses for volatile organic compounds (VOCs), as well as measurement of selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation processes (reductive dechlorination) in the subsurface environment (Argonne 2006, 2007a, 2008a). The results from the two-year sampling program demonstrated the presence of carbon tetrachloride contamination at levels exceeding the KDHE Tier 2 risk-based screening level (RBSL) of 5 {micro}g/L for this compound, in a localized groundwater plume that has shown little movement. The relative concentrations of chloroform, the primary degradation product of carbon tetrachloride, suggested that some degree of reductive dechlorination or natural biodegradation was talking place in situ at the former CCC/USDA facility on a localized scale. The CCC/USDA subsequently developed an Interim Measure Conceptual Design (Argonne 2007b), proposing a pilot test of the Adventus EHC technology for in situ chemical reduction (ISCR). The proposed interim measure (IM) was approved by the KDHE in November 2007 (KDHE 2007). Implementation of the pilot test occurred in November-December 2007. The objective was to create highly reducing conditions that would enhance both chemical and biological reductive dechlorination in the injection test area (Argonne 2009a). The KDHE (2008a) requested that sitewide monitoring continue until a final remedy is selected (as part of a Corrective Action Study [CAS] evaluation) and implemented. In response to this request, the established sampling across the site and additional sampling in the IM pilot test area continued in 2008 (Argonne 2008b, 2009a,b). On the basis of results of the 2005-2008 sitewide monitoring and the 2008 IM pilot test monitoring, the CCC/USDA recommended a revised sampling program for both the wider site and the IM pilot test area (Section 4.2 in Argonne 2009b). The elements of this interim monitoring plan are as follows: (1) Annual sampling of twelve monitoring points across the site (Figure 1.1) and five outlying IM pilot test monitoring points (PMP4, PMP5, PMP6, PMP7, PMP9; Figure 1.2); and (2) Twice yearly sampling of five IM pilot test monitoring points inside the injection area (PMP1-PMP3, PMP8, MW02; Figure 1.2). With the approval of the KDHE (2009), the initial groundwater sampling for VOCs and geochemical analyses under the interim monitoring plan outlined above was conducted in 2009 (Argonne 2010). The present report documents the findings of the 2010 monitoring events, conducted on April 5 and September 19-21, 2010.« less

  14. In-place cement stabilized base reconstruction techniques interim report : "construction and two year evaluation".

    DOT National Transportation Integrated Search

    2002-08-01

    The purpose of this research was to evaluate the effectiveness of soil cement shrinkage crack mitigation techniques. The contents of this report reflect an evaluation of the construction of the test sections and a two-year evaluation of the test sect...

  15. Interim Evaluation Results from New Flyer/Allison Hybrid Buses at King County Metro: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chandler, K.; Eberts, E.; Eudy, L.

    2005-05-01

    This paper prepared for the 2005 American Public Transportation Association Bus & Paratransit Conference discusses NREL/DOE evaluation of hybrid electric articulated transit buses operated by King County Metro.

  16. A pavement management research program for Oregon highways : interim report.

    DOT National Transportation Integrated Search

    1985-03-01

    This is the first in a series of reports documenting progress on a statewide pavement management research project. The overall project is conducting research into pavement life cycles of different rehabilitation treatment; the cost-effectiveness of e...

  17. 30 CFR 250.911 - If my platform is subject to the Platform Verification Program, what must I do?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a project management timeline, Gantt Chart, that depicts when interim and final reports required by... 30 Mineral Resources 2 2010-07-01 2010-07-01 false If my platform is subject to the Platform Verification Program, what must I do? 250.911 Section 250.911 Mineral Resources MINERALS MANAGEMENT SERVICE...

  18. Consortium for Planning, Developing, and Implementing Exploratory Industrial Career Development Models (Phase I of Three Phases). Interim Report.

    ERIC Educational Resources Information Center

    Oregon State Univ., Corvallis.

    The report describes the organizational phase of a project designed to create program models and supporting literature for exploratory industrial career development programs for grades seven to ten. The project was undertaken by Oregon State University in cooperation with the Oregon State Department of Education and involved the formation of a…

  19. A Cooperative Program Between a City School District and a Suburban School District. Interim Report.

    ERIC Educational Resources Information Center

    Rochester City School District, NY.

    An urban-suburban interdistrict program is described in which efforts were made to correct racial imbalance in both districts. In 1965 free transportation was provided for 25 first grade children who were sent voluntarily from a Rochester, N.Y. public school to six schools in the West Irondequoit district. This longitudinal metropolitan approach…

  20. A Guide for Planning Facilities for Occupational Preparation Programs in Data Processing. Interim Report. Research 25.

    ERIC Educational Resources Information Center

    McIntosh, William A.

    This guide lists a series of pivotal questions about the educational program to be offered, and the answers to these questions bear directly on the numbers and kinds of instructional areas needed in the contemplated facilities. Much of the material is presented in a checklist format which allows for consideration of alternatives in facility…

  1. Providing More Cash for College: Interim Findings from the Performance-Based Scholarship Demonstration in California

    ERIC Educational Resources Information Center

    Richburg-Hayes, Lashawn; Patel, Reshma; Brock, Thomas; de la Campa, Elijah; Rubb, Timothy; Valenzuela, Ireri

    2015-01-01

    One of the original purposes of student financial aid was to ensure fairer access to post-secondary education to those least able to afford it and to those traditionally underrepresented. Various federal and state programs were put in place to achieve this goal, including the federal Pell Grant and state aid programs. Yet policymakers and…

  2. Student Perceptions of Staged Transfer to Independent Research Skills during a Four-Year Honours Science Undergraduate Program

    ERIC Educational Resources Information Center

    Symons, Sarah L.; Colgoni, Andrew; Harvey, Chad T.

    2017-01-01

    We describe interim results of an ongoing longitudinal pedagogical study investigating the efficacy of the Honours Integrated Science Program (iSci). We describe the pedagogical methods we use to prompt research skill development in a model from instructor-dependence to independent original research. We also describe a tool we use to help students…

  3. 340B Drug Pricing Program Ceiling Price and Manufacturer Civil Monetary Penalties Regulation. Final rule; further delay of effective date.

    PubMed

    2017-05-19

    The Health Resources and Services Administration (HRSA) administers section 340B of the Public Health Service Act (PHSA), referred to as the "340B Drug Pricing Program" or the "340B Program." HRSA published a final rule on January 5, 2017, that set forth the calculation of the ceiling price and application of civil monetary penalties. The final rule applied to all drug manufacturers that are required to make their drugs available to covered entities under the 340B Program. In accordance with a January 20, 2017, memorandum from the Assistant to the President and Chief of Staff, entitled "Regulatory Freeze Pending Review," HRSA issued an interim final rule that delayed the effective date of the final rule published in the Federal Register (82 FR 1210, (January 5, 2017)) to May 22, 2017. HHS invited commenters to provide their views on whether a longer delay of the effective date to October 1, 2017, would be more appropriate. After consideration of the comments received on the interim final rule, HHS is delaying the effective date of the January 5, 2017 final rule, to October 1, 2017.

  4. Comparative evaluation of concrete sealers and multiple layer polymer concrete overlays. Interim report no. 1.

    DOT National Transportation Integrated Search

    1987-01-01

    The report presents comparisons of initial evaluations of several concrete sealers and multiple layer polymer concrete overlays. The sealers evaluated included a solvent-dlspersed epoxy, a water-dlspersed epoxy, a silane, and a high molecular weight ...

  5. Letter to the editor regarding "GRAS from the ground up: Review of the Interim Pilot Program for GRAS notification" by.

    PubMed

    Sewalt, Vincent; LaMarta, James; Shanahan, Diane; Gregg, Lori; Carrillo, Roberto

    2017-09-01

    Present letter is aimed at clarifying some critical points highlighted by Hanlon et al. regarding the common knowledge element of the safety of food enzymes in support of their GRAS designation. Particularly, we outline the development of peer-reviewed, generally recognized safety evaluation methodology for microbial enzymes and its adoption by the enzyme industry, which provides the US FDA with a review framework for enzyme GRAS Notices. This approach may serve as a model to other food ingredient categories for a scientifically sound, rigorous, and transparent application of the GRAS concept. Copyright © 2017 Elsevier Ltd. All rights reserved.

  6. Science Opportunities Enabled by NASA's Constellation System: Interim Report

    NASA Astrophysics Data System (ADS)

    Committee On Science Opportunities Enabled By Nasa'S Constellation System, National Research Council

    To begin implementation of the Vision for Space Exploration (recently renamed "United States Space Exploration Policy"), NASA has begun development of new launch vehicles and a human-carrying spacecraft that are collectively called the Constellation System. In November 2007, NASA asked the NRC to evaluate the potential for the Constellation System to enable new space science opportunities. For this interim report, 11 existing "Vision Mission" studies of advanced space science mission concepts inspired by earlier NASA forward-looking studies were evaluated. The focus was to assess the concepts and group them into two categories: more-deserving or less deserving of future study. This report presents a description of the Constellation System and its opportunities for enabling new space science opportunities, and a systematic analysis of the 11 Vision Mission studies. For the final report, the NRC issued a request for information to the relevant communities to obtain ideas for other mission concepts that will be assessed by the study committee, and several issues addressed only briefly in the interim report will be explored more fully.

  7. A case of cooperation in the European OR education

    NASA Astrophysics Data System (ADS)

    Miranda, João; Nagy, Mariana

    2011-12-01

    European cooperation is a relevant subject that contributes to building a competitive network of high education institutions. A case of teacher mobility on behalf of the Erasmus programme is presented: it considers some Operations Research topics and the development of the Lego on My Decision module. The module considers eight lecture hours in four sessions: (i) the introductory session, to focus on the basics of computational linear algebra, linear programming, integer programming, with computational support (Excel®); (ii) the interim session, to address modelling subjects in a drop by-session; (iii) the advanced session, on the sequence of (i), to consider uncertainty and also how to use multi-criteria decision-making methods; (iv) the final session, to perform the evaluation of learning outcomes. This cooperation at European level is further exploited, including curricula normalisation and adjustments, cultural exchanges and research lines sharing in the idea of promoting the mobility of students and faculty.

  8. 75 FR 73169 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ...This final rule with comment period addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It finalizes the calendar year (CY) 2010 interim relative value units (RVUs) and issues interim RVUs for new and revised procedure codes for CY 2011. It also addresses, implements, or discusses certain provisions of both the Affordable Care Act (ACA) and the Medicare Improvements for Patients and Providers Act of 2008 (MIPPA). In addition, this final rule with comment period discusses payments under the Ambulance Fee Schedule (AFS), the Ambulatory Surgical Center (ASC) payment system, and the Clinical Laboratory Fee Schedule (CLFS), payments to end-stage renal disease (ESRD) facilities, and payments for Part B drugs. Finally, this final rule with comment period also includes a discussion regarding the Chiropractic Services Demonstration program, the Competitive Bidding Program for durable medical equipment, prosthetics, orthotics, and supplies (CBP DMEPOS), and provider and supplier enrollment issues associated with air ambulances.

  9. 75 FR 10645 - Low Pathogenic Avian Influenza; Voluntary Control Program and Payment of Indemnity

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-09

    ...We are adopting as a final rule, with changes, an interim rule that amended the regulations by establishing, under the auspices of the National Poultry Improvement Plan, a voluntary program for the control of the H5/H7 subtypes of low pathogenic avian influenza in commercial poultry. As amended by this document, the rule provides that the amount of indemnity for which contract growers are eligible will be reduced by any payment they have already received on their contracts when poultry in their care are destroyed, clarifies the roles of cooperating State agencies with respect to H5/H7 low pathogenic avian influenza outbreaks, provides that consistency with humane euthanasia guidelines will be considered when selecting a method for the destruction of poultry, and provides additional guidance for cleaning and disinfecting an affected premises. The control program and indemnity provisions established by the interim rule are necessary to help ensure that the H5/H7 subtypes of low pathogenic avian influenza are detected and eradicated when they occur within the United States.

  10. Interim Outcomes Assessment of the Comprehensive Clinical Performance Grid for Student Evaluation.

    ERIC Educational Resources Information Center

    Tolls, Dorothy Bazzinotti; Carlson, Nancy; Wilson, Roger; Richman, Jack

    2001-01-01

    Assessed the viability of the Comprehensive Clinical Performance Grid for Student Evaluation, introduced at The New England College of Optometry in 1996 in clinical student assessment. Analyzed faculty and student feedback and consistency with previous evaluations, between evaluators, and between clinical sites and tracts. Found satisfaction with…

  11. 40 CFR 80.141 - Interim detergent gasoline program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...

  12. 40 CFR 80.141 - Interim detergent gasoline program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...

  13. 40 CFR 80.141 - Interim detergent gasoline program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...

  14. 40 CFR 80.141 - Interim detergent gasoline program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...

  15. Mobile satellite service for Canada

    NASA Technical Reports Server (NTRS)

    Sward, David

    1988-01-01

    The Mobile Satellite (MSAT) system and a special program designed to provide interim mobile satellite services (IMSS) during the construction phase of MSAT are described. A mobile satellite system is a key element in extending voice and and data telecommunications to all Canadians.

  16. 76 FR 16760 - Energy Conservation Program for Consumer Products: Publication of the Petition for Waiver and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... anti-sweat heaters. Therefore, it is ordered that: The application for interim waiver filed by Samsung... control anti-sweat heaters according to the alternate test procedure as set forth in section IV...

  17. 40 CFR 57.807 - Hearing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Hearing. 57.807 Section 57.807 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS Waiver of Interim Requirement for Use of Continuous Emission Reduction Technology...

  18. BACT Phase I: Interim Report of the Climate Change Workgroup of the Permits, New Source Review, and Toxic Subcommittee

    EPA Pesticide Factsheets

    This report report details the issues involved in implementing the Clean Air Act's Prevention of Significant Deterioration (PSD) program permittingrequirements for new and modified sources of greenhouse gases (GHGs).

  19. Implementation of high performance concrete in Louisiana bridges : interim report.

    DOT National Transportation Integrated Search

    1998-02-01

    The report contains a research plan to assist in the implementation of high performance concrete in the Charenton Canal Bridge in Louisiana. The research involves a literature review, plan review, development of a quality control program for the conc...

  20. Medical-device risk management and public safety: using cost-benefit as a measurement of effectiveness

    NASA Astrophysics Data System (ADS)

    Hughes, Allen A.

    1994-12-01

    Public safety can be enhanced through the development of a comprehensive medical device risk management. This can be accomplished through case studies using a framework that incorporates cost-benefit analysis in the evaluation of risk management attributes. This paper presents a framework for evaluating the risk management system for regulatory Class III medical devices. The framework consists of the following sixteen attributes of a comprehensive medical device risk management system: fault/failure analysis, premarket testing/clinical trials, post-approval studies, manufacturer sponsored hospital studies, product labeling, establishment inspections, problem reporting program, mandatory hospital reporting, medical literature surveillance, device/patient registries, device performance monitoring, returned product analysis, autopsy program, emergency treatment funds/interim compensation, product liability, and alternative compensation mechanisms. Review of performance histories for several medical devices can reveal the value of information for many attributes, and also the inter-dependencies of the attributes in generating risk information flow. Such an information flow network is presented as a starting point for enhancing medical device risk management by focusing on attributes with high net benefit values and potential to spur information dissemination.

  1. Evaluation of internal fit of interim crown fabricated with CAD/CAM milling and 3D printing system.

    PubMed

    Lee, Wan-Sun; Lee, Du-Hyeong; Lee, Kyu-Bok

    2017-08-01

    This study is to evaluate the internal fit of the crown manufactured by CAD/CAM milling method and 3D printing method. The master model was fabricated with stainless steel by using CNC machine and the work model was created from the vinyl-polysiloxane impression. After scanning the working model, the design software is used to design the crown. The saved STL file is used on the CAD/CAM milling method and two types of 3D printing method to produce 10 interim crowns per group. Internal discrepancy measurement uses the silicon replica method and the measured data are analyzed with One-way ANOVA to verify the statistic significance. The discrepancy means (standard deviation) of the 3 groups are 171.6 (97.4) µm for the crown manufactured by the milling system and 149.1 (65.9) and 91.1 (36.4) µm, respectively, for the crowns manufactured with the two types of 3D printing system. There was a statistically significant difference and the 3D printing system group showed more outstanding value than the milling system group. The marginal and internal fit of the interim restoration has more outstanding 3D printing method than the CAD/CAM milling method. Therefore, the 3D printing method is considered as applicable for not only the interim restoration production, but also in the dental prosthesis production with a higher level of completion.

  2. Seasonal evaluation of evapotranspiration fluxes from MODIS satellite and mesoscale model downscaled global reanalysis datasets

    NASA Astrophysics Data System (ADS)

    Srivastava, Prashant K.; Han, Dawei; Islam, Tanvir; Petropoulos, George P.; Gupta, Manika; Dai, Qiang

    2016-04-01

    Reference evapotranspiration (ETo) is an important variable in hydrological modeling, which is not always available, especially for ungauged catchments. Satellite data, such as those available from the MODerate Resolution Imaging Spectroradiometer (MODIS), and global datasets via the European Centre for Medium Range Weather Forecasts (ECMWF) reanalysis (ERA) interim and National Centers for Environmental Prediction (NCEP) reanalysis are important sources of information for ETo. This study explored the seasonal performances of MODIS (MOD16) and Weather Research and Forecasting (WRF) model downscaled global reanalysis datasets, such as ERA interim and NCEP-derived ETo, against ground-based datasets. Overall, on the basis of the statistical metrics computed, ETo derived from ERA interim and MODIS were more accurate in comparison to the estimates from NCEP for all the seasons. The pooled datasets also revealed a similar performance to the seasonal assessment with higher agreement for the ERA interim (r = 0.96, RMSE = 2.76 mm/8 days; bias = 0.24 mm/8 days), followed by MODIS (r = 0.95, RMSE = 7.66 mm/8 days; bias = -7.17 mm/8 days) and NCEP (r = 0.76, RMSE = 11.81 mm/8 days; bias = -10.20 mm/8 days). The only limitation with downscaling ERA interim reanalysis datasets using WRF is that it is time-consuming in contrast to the readily available MODIS operational product for use in mesoscale studies and practical applications.

  3. UNESCO Science Programs: Impacts of U.S. Withdrawal and Suggestions for Alternative Interim Arrangements. A Preliminary Assessment.

    ERIC Educational Resources Information Center

    National Academy of Sciences - National Research Council, Washington, DC. Office of International Affairs.

    This study was conducted to provide the U.S. Department of State with an assessment of the potential impacts on science of a United States withdrawal from UNESCO and to suggest possible alternative arrangements to maintain essential U.S. scientific contacts with UNESCO-sponsored programs in case the United States were no longer a member of UNESCO…

  4. 40 CFR 86.1861-04 - How do the Tier 2 and interim non-Tier 2 NOX averaging, banking and trading programs work?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 2 NOX averaging, banking and trading programs work? 86.1861-04 Section 86.1861-04 Protection of... work? (a) General provisions for Tier 2 credits and debits. (1) A manufacturer whose Tier 2 fleet... to a full useful life of 100,000 miles, provided that the credits are prorated by a multiplicative...

  5. Evaluation of rubber-asphalt chip seal in Oregon : interim report.

    DOT National Transportation Integrated Search

    1977-05-01

    The Oregon State Highway Division, in cooperation with the Federal Highway Administration, participated in a demonstration project on the evaluation of rubber-asphalt chip seals. The trial projects were placed in Maintenance District 11, in the vicin...

  6. Bringing English to Order: A Personal Account of the NCC English Evaluation Project.

    ERIC Educational Resources Information Center

    Clark, Urszula

    1994-01-01

    Provides a personal account of Great Britain's National Curriculum Committee's English Evaluation Project based at Warwick University. Describes the way the interim and final results of the committee were used by higher powers. (HB)

  7. Evaluation of Stainless Steel Reinforcement in Bridge Decks.

    DOT National Transportation Integrated Search

    2007-10-01

    This report is a follow up and final report to the report on the Evaluation of Stainless Steel Reinforcement, Construction Report. RDT 03 003. The results of interim testing during the bridges first five years are reported for Missouris...

  8. Evaluation of 3-D laser scanning equipment : 2016 interim report.

    DOT National Transportation Integrated Search

    2017-05-01

    As a follow-up to ICT Project R27-030, Evaluation of 3-D Laser Scanning, this report provides findings of an evaluation of 3-D laser : scanning equipment to determine the tangible costs versus benefits and the manpower savings realized by using the e...

  9. A Procedure for Structural Weight Estimation of Single Stage to Orbit Launch Vehicles (Interim User's Manual)

    NASA Technical Reports Server (NTRS)

    Martinovic, Zoran N.; Cerro, Jeffrey A.

    2002-01-01

    This is an interim user's manual for current procedures used in the Vehicle Analysis Branch at NASA Langley Research Center, Hampton, Virginia, for launch vehicle structural subsystem weight estimation based on finite element modeling and structural analysis. The process is intended to complement traditional methods of conceptual and early preliminary structural design such as the application of empirical weight estimation or application of classical engineering design equations and criteria on one dimensional "line" models. Functions of two commercially available software codes are coupled together. Vehicle modeling and analysis are done using SDRC/I-DEAS, and structural sizing is performed with the Collier Research Corp. HyperSizer program.

  10. Medicare program; revisions to FY 2009 Medicare severity-long-term care diagnosis-related group (MS-LTC-DRG) weights. Interim final rule with comment period.

    PubMed

    2009-06-03

    This interim final rule with comment period implements revised Medicare severity long-term care diagnosis-related group (MS-LTC-DRG) relative weights for payment under the long-term care hospital (LTCH) prospective payment system (PPS) for federal fiscal year (FY) 2009. We are revising the MS-LTC-DRG relative weights for FY 2009 due to the misapplication of our established methodology in the calculation of the budget neutrality factor. The revised FY 2009 MS-LTC-DRG relative weights are effective for the remainder of FY 2009 (that is, from June 3, 2009 through September 30, 2009).

  11. TRU Waste Management Program. Cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  12. INTERIM METHOD FOR THE DETERMINATION OF ASBESTOS IN BULK INSULATION SAMPLES

    EPA Science Inventory

    The U.S. Environmental Protection Agency Asbestos-in-Schools Program was established in March, 1979 to provide information and technical assistance to the public for addressing problems presented by asbestos-containing insulation materials in school buildings. Because there were ...

  13. 40 CFR 265.113 - Closure; time allowed for closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... includes an amended waste analysis plan, ground-water monitoring and response program, human exposure....113 Section 265.113 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND...

  14. 40 CFR 80.141 - Interim detergent gasoline program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) “Carburetor Cleanliness Test Procedure, State-of-the-Art Summary, Report: 1973-1981”, Coordinating Research... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold... who manufacture, supply, or transfer detergent additives or detergent-additized post-refinery...

  15. 40 CFR 57.813 - Final decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Final decision. 57.813 Section 57.813 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS Waiver of Interim Requirement for Use of Continuous Emission Reduction Technology...

  16. 40 CFR 142.22 - Review of State variances, exemptions and schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Review of...) Not later than 18 months after the effective date of the interim national primary drinking water... (and schedules prescribed pursuant thereto) by the States with primary enforcement responsibility...

  17. Land Use Management for Solid Waste Programs

    ERIC Educational Resources Information Center

    Brown, Sanford M., Jr.

    1974-01-01

    The author discusses the problems of solid waste disposal and examines various land use management techniques. These include the land use plan, zoning, regionalization, land utilities, and interim use. Information concerning solid waste processing site zoning and analysis is given. Bibliography included. (MA)

  18. Contribution of postpolymerization conditioning and storage environments to the mechanical properties of three interim restorative materials.

    PubMed

    Thompson, Geoffrey A; Luo, Qing

    2014-09-01

    Because polymer-based interim restorative materials are weak, even well-made restorations sometimes fail before the definitive restoration is ready for insertion. Therefore, knowing which fabrication procedures and service conditions affect mechanical properties is important, particularly over an extended period. The purpose of this study was to evaluate the effect of thermal treatment, surface sealing, thermocycling, storage media, storage temperature, and age on autopolymerizing poly(methylmethacrylate) and bis-acryl interim restorative materials. Outcome measures were flexural strength, Vickers surface microhardness, and impact strength. Flexural strength and microhardness of poly(methylmethacrylate) (Jet Acrylic) and 2 bis-acryl-composite resin (Protemp 3 Garant and Integrity) interim restorative materials were evaluated as affected by storage media, storage temperature, storage time, thermocycling, postpolymerization thermal treatment, or application of a surface sealer. In total, 2880 beam specimens (25×2×2 mm) were fabricated. Mechanical property analyses were made at 10 days, 30 days, 6 months, and 1 year after specimen preparation. Flexural strength was determined by using a 3-point bending test in a universal testing machine with a 1 kN load cell at a crosshead speed of 5.0 mm min(-1). Fracture specimens were recovered and used for determining Vickers microhardness. Measurements were made with a 0.1 N load and 15 second dwell time. Three microhardness measurements were made for each specimen, and the mean was used for reporting Vickers microhardness. Notched impact specimens (64×12.7×6.35 mm) were fabricated from Jet, Protemp 3 Garant, and Integrity interim restorative materials, yielding 288 impact specimens. Impact strengths were assessed at 10 days, 30 days, 6 months, and 1 year with a 2 J pendulum. The effects of the various experimental treatments were determined and rank ordered with analysis of variance, F ratios, and least square means differences Student t tests (α=.05). All experimental treatments investigated had significant effects on flexural strength, with material (P<.001) and thermocycling (P<.001) being dominant. Moreover, all experimental treatments investigated had a significant overall impact on Vickers microhardness with material (P<.001) and Palaseal glaze (P<.001) showing large effects. Material (P<.001) and age (P=.010) had a significant effect on impact strength. Mechanical properties of some interim polymeric materials can be improved by postpolymerization heat treatments or surface glazing. This procedure may extend the useful lifetime of some bis-acryl interim restorations. Copyright © 2014 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  19. Analysis of Transportation Options for Commercial Spent Fuel in the U.S.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kalinina, Elena; Busch, Ingrid Karin

    The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S.more » Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF)...« less

  20. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  1. Flight Set 360T004 (STS-30) Insulation Component, Interim Release, Volume 3

    NASA Technical Reports Server (NTRS)

    Passman, James A.

    1989-01-01

    The insulation component of the Redesigned Solid Rocket Motor (RSRM) is discussed. The results of all visual evaluations and a thermal safety factor analysis are given. The data contained here supersedes the interim release and the insulation data presented in the Clearfield 10 day report. The objective is to document the postflight condition of the internal and external insulation of nozzle to case joints, the case field joints, the igniter to case joints, and the acreage insulation which made up RSRM-4A and RSRM-4B.

  2. 46 CFR 30.30-3 - Evaluation materials.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Evaluation materials. 30.30-3 Section 30.30-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS GENERAL PROVISIONS Interim Procedures for... materials. The materials to be submitted for evaluation must include the English text of the following: (a...

  3. Evaluation of the performance, cost-effectiveness, and timing of various preventive maintenances : interim report.

    DOT National Transportation Integrated Search

    2010-10-01

    This research study evaluated the performance of various pavement preservation treatments over time and under different : environmental conditions to quantify the economics of each treatment type. There are three primary techniques utilized in Colora...

  4. Colonie Interim Storage Site environmental report for calendar year 1992, 1130 Central Avenue, Colonie, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-01

    This report describes the environmental surveillance program at the Colonie Interim Storage Site (CISS) and provides the results for 1992. The site is located in eastern New York State, approximately 6.4 km (4.0 mi) northwest of downtown Albany. From 1958 to 1984, National Lead (NL) Industries used the facility to manufacture various components from depleted and enriched uranium natural thorium. Environmental monitoring of CISS began in 1984 when Congress added, the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program established to identify and decontaminate or otherwise control sites wheremore » residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental surveillance program at CISS includes sampling networks for external gamma radiation exposure and for thorium-232 and total uranium concentrations in surface water, sediment, and groundwater. Several chemical parameters are also measured in groundwater, including total metals, volatile organics, and water quality parameters. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements.« less

  5. Comparison of measured and calculated dynamic loads for the Mod-2 2.5 mW wind turbine system

    NASA Technical Reports Server (NTRS)

    Zimmerman, D. K.; Shipley, S. A.; Miller, R. D.

    1995-01-01

    The Boeing Company, under contract to the Electric Power Research Institute (EPRI), has completed a test program on the Mod-2 wind turbines at Goodnoe Hills, Washington. The objectives were to update fatigue load spectra, discern site and machine differences, measure vortex generator effects, and to evaluate rotational sampling techniques. This paper shows the test setup and loads instrumentation, loads data comparisons and test/analysis correlations. Test data are correlated with DYLOSAT predictions using both the NASA interim turbulence model and rotationally sampled winds as inputs. The latter is demonstrated to have the potential to improve the test/analysis correlations. The paper concludes with an assessment of the importance of vortex generators, site dependence, and machine differences on fatigue loads. The adequacy of prediction techniques used are evaluated and recommendations are made for improvements to the methodology.

  6. Ecological Risk Assessment Guidance for Superfund: Process for Designing and Conducting Ecological Risk Assessments - Interim Final

    EPA Pesticide Factsheets

    This document provides guidance to site managers and Remedial Project Managers who are legally responsible for the management of a site on how to design and conduct technically defensible ecological risk assessments for the Superfund program.

  7. 77 FR 4674 - State Fiscal Stabilization Fund Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-31

    ... and competing priorities that States were facing in meeting the SFSF data collection and reporting... the interim final requirement (i.e., the notice of proposed revisions to certain data collection and... collection instructions; respondents can provide the requested data in the desired format; reporting burden...

  8. Onsite 40-kilowatt fuel cell power plant manufacturing and field test program

    NASA Technical Reports Server (NTRS)

    1985-01-01

    A joint Gas Research Institute and U.S. Department of Energy Program was initiated in 1982 to evaluate the use of fuel cell power systems for on-site energy service. Forty-six 40 kW fuel cell power plants were manufactured at the United Technologies Corporation facility in South Windsor, Connecticut, and are being delivered to host utilities and other program participants in the United States and Japan for field testing. The construction of the 46 fully-integrated power plants was completed in January 1985 within the constraints of the contract plan. The program has provided significant experience in the manufacture, acceptance testing, deployment, and support of on-site fuel cell systems. Initial field test results also show that these experimental power plants meet the performance and environmental requirements of a commercial specification. This Interim Report encompasses the design and manufacturing phases of the 40 kW Power Plant Manufacturing and Field Test program. The contract between UTC and NASA also provides UTC field engineering support to the host utilities, training programs and associated manuals for utility operating and maintenance personnel, spare parts support for a defined test period, and testing at UTC of a power plant made available from a preceding program phase. These activities are ongoing and will be reported subsequently.

  9. Extraction-Scrub-Strip test results from the interim Salt Disposition Program Macrobatch 9 Tank 21H qualification samples

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, T.

    2016-02-23

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 9 for the Interim Salt Disposition Program (ISDP). The Salt Batch 9 characterization results were previously reported. An Extraction-Scrub-Strip (ESS) test was performed to determine cesium distribution ratios (D (Cs)) and cesium concentration in the strip effluent and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a blend solvent prepared by SRNL that mimics the solvent composition currently being used atmore » the Modular Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D (Cs) value of 52.4. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This compares well against the predicted value of 56.5 from a recently created D (Cs) model« less

  10. Extraction, -scrub, -strip test results from the interim salt disposition program macrobatch 10 tank 21H qualification samples

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, T. B.

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). The Salt Batch 10 characterization results were previously reported.ii,iii An Extraction, -Scrub, -Strip (ESS) test was performed to determine cesium distribution ratios (D(Cs)) and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a sample of the NGS Blend solvent currently being used at the Modularmore » Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D(Cs) value of 110. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This is better than the predicted value of 39.8 from a recently created D(Cs) model.« less

  11. The Homestake Interim Laboratory and Homestake DUSEL

    NASA Astrophysics Data System (ADS)

    Lesko, Kevin T.

    2011-12-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for developing the Homestake Interim Laboratory and evolving this facility into DUSEL are presented.

  12. A two-stage patient enrichment adaptive design in phase II oncology trials.

    PubMed

    Song, James X

    2014-01-01

    Illustrated is the use of a patient enrichment adaptive design in a randomized phase II trial which allows the evaluation of treatment benefits by the biomarker expression level and makes interim adjustment according to the pre-specified rules. The design was applied to an actual phase II metastatic hepatocellular carcinoma (HCC) trial in which progression-free survival (PFS) in two biomarker-defined populations is evaluated at both interim and final analyses. As an extension, a short-term biomarker is used to predict the long-term PFS in a Bayesian model in order to improve the precision of hazard ratio (HR) estimate at the interim analysis. The characteristics of the extended design are examined in a number of scenarios via simulations. The recommended adaptive design is shown to be useful in a phase II setting. When a short-term maker which correlates with the long-term PFS is available, the design can be applied in smaller early phase trials in which PFS requires longer follow-up. In summary, the adaptive design offers flexibility in randomized phase II patient enrichment trials and should be considered in an overall personalized healthcare (PHC) strategy. Copyright © 2013 Elsevier Inc. All rights reserved.

  13. Report of Ad Hoc Committee on Energy Efficiency in Transportation to the Interdepartmental Fuel and Energy Committee of the State of New York. Interim Report.

    ERIC Educational Resources Information Center

    New York State Interdepartmental Fuel and Energy Committee, Albany.

    After presenting the background of the availability of fuel for transportation and the increasing per capita energy consumption, the report examines the State's role in energy conservation. Five proposals are outlined: (1) a coordinated education program designed to increase public awareness of the current energy situation; (2) a pilot program of…

  14. Atmospheric effects of stratospheric aircraft: An evaluation of NASA's interim assessment

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The advent of high-speed civil transport aircraft (HSCT's) some 25 years ago generated considerable concern about potential impacts on the stratosphere. With interest in such aircraft again increasing, NASA initiated an assessment of the potential stratospheric impacts of a substantial increase in the use of HSCT's. This assessment was intended to examine, from the standpoint of present scientific understanding, the potential atmospheric impacts of a fleet of high-speed civil transports flying supersonically in the lower stratosphere. The program was initiated in 1991, and the bulk of its research is scheduled to be completed in 1995. In early 1993 NASA asked the National Research Council to review its efforts. This report documents its findings and recommendations.

  15. American Recovery and Reinvestment Act of 2009. Interim Report on Customer Acceptance, Retention, and Response to Time-Based Rates from the Consumer Behavior Studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cappers, Peter; Hans, Liesel; Scheer, Richard

    Time-based rate programs1, enabled by utility investments in advanced metering infrastructure (AMI), are increasingly being considered by utilities as tools to reduce peak demand and enable customers to better manage consumption and costs. There are several customer systems that are relatively new to the marketplace and have the potential for improving the effectiveness of these programs, including in-home displays (IHDs), programmable communicating thermostats (PCTs), and web portals. Policy and decision makers are interested in more information about customer acceptance, retention, and response before moving forward with expanded deployments of AMI-enabled new rates and technologies. Under the Smart Grid Investment Grantmore » Program (SGIG), the U.S. Department of Energy (DOE) partnered with several utilities to conduct consumer behavior studies (CBS). The goals involved applying randomized and controlled experimental designs for estimating customer responses more precisely and credibly to advance understanding of time-based rates and customer systems, and provide new information for improving program designs, implementation strategies, and evaluations. The intent was to produce more robust and credible analysis of impacts, costs, benefits, and lessons learned and assist utility and regulatory decision makers in evaluating investment opportunities involving time-based rates. To help achieve these goals, DOE developed technical guidelines to help the CBS utilities estimate customer acceptance, retention, and response more precisely.« less

  16. Wayne Interim Storage Site environmental report for calendar year 1992, 868 Black Oak Ridge Road, Wayne, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-01

    This report describes the environmental surveillance program at the Wayne Interim Storage Site (WISS) and provides the results for 1992. The fenced, site, 32 km (20 mi) northwest of Newark, New Jersey, was used between 1948 and 1971 for commercial processing of monazite sand to separate natural radioisotopes - predominantly thorium. Environmental surveillance of WISS began in 1984 in accordance with Department of Energy (DOE) Order 5400.1 when Congress added the site to DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). The environmental surveillance program at WISS includes sampling networks for radon and thoron in air; external gamma radiation exposure;more » radium-226, radium-228, thorium-230, thorium-232, total uranium, and several chemicals in surface water and sediment; and total uranium, radium-226, radium-228, thorium-230, thorium-232, and organic and inorganic chemicals in groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. This monitoring program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results for environmental surveillance in 1992 show that the concentrations of all radioactive and most chemical contaminants were below applicable standards.« less

  17. IVHS Countermeasures for Rear-End Collisions, Task 1 Vol. III: 1991 NASS CDS Case Analysis

    DOT National Transportation Integrated Search

    1994-02-15

    This report is from the NHTSA sponsored program, "IVHS Countermeasures for Rear-End Collisions". The Task 1 Interim Report consists of six volumes. This Volume, Volume III, 1991 NASS CDS Clinical Case Analysis presents the results of a clinical case ...

  18. Study of Fuel Economy and Emission Reduction Methods for Marine and Locomotive Diesel Engines

    DOT National Transportation Integrated Search

    1975-09-01

    This interim report presents the results of the first phase of a two-part program to investigate methods of improving fuel consumption and reducing exhaust emissions for in-service diesel engines used as prime movers in locomotives and several classe...

  19. A Study of an Emerging Occupation: The Gastroenterology Assistant. Interim Report.

    ERIC Educational Resources Information Center

    Kuritsky, Joel; Goldsmith, Katherine L.

    To determine the need, desirability, and training requirements for a gastroenterology assistant training program, interviews with gastroenterologists, a survey of 15 hospitals, and observations of gastroenterology laboratories were conducted. In addition, a questionnaire to ascertain which laboratory tests the assistant would perform was…

  20. 7 CFR 280.1 - Interim disaster procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the value of the food actually lost in such disaster but not greater than the applicable maximum... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM EMERGENCY FOOD ASSISTANCE FOR VICTIMS OF DISASTERS § 280...

  1. 7 CFR 280.1 - Interim disaster procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the value of the food actually lost in such disaster but not greater than the applicable maximum... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM EMERGENCY FOOD ASSISTANCE FOR VICTIMS OF DISASTERS § 280...

  2. 40 CFR 142.22 - Review of State variances, exemptions and schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Review of...) Not later than 18 months after the effective date of the interim national primary drinking water... scientific matters bearing on such variances and exemptions), and (2) advise of the opportunity to submit...

  3. Health: Overview. Interim Guide.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education, Winnipeg.

    The Manitoba Health Education Curriculum focuses on promoting the development of positive lifestyle practices in students from kindergarten through grade nine. The core units of the program are: (1) social-emotional well-being; (2) physical well-being; (3) nutrition; (4) dental health; (5) safety; and (6) environmental health. This overview offers…

  4. Interpretation of the Ecological Significance of Atrazine Stream-Water Concentrations Using a Statistically-Designed Monitoring Program

    EPA Science Inventory

    A risk assessment was conducted by the US Environmental Protection Agency (EPA) as part of the 2003 Interim Registration Eligibility Document (IRED) on atrazine. The assessment indicated potential community- and population-level risk to sensitive aquatic ecosystems at prolonged ...

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, T. B.; Bannochie, C. J.

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of verification of Macrobatch (Salt Batch) 11 for the Interim Salt Disposition Program (ISDP) for processing. This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR).

  6. 40 CFR 57.816 - Effect of negative recommendation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Effect of negative recommendation. 57.816 Section 57.816 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Reduction Technology § 57.816 Effect of negative recommendation. No waiver of the interim requirement for...

  7. 75 FR 55634 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-13

    ...: 1505-0209. Type of Review: Revision of a currently approved collection. Title: Troubled Asset Relief Program--Conflicts of Interest. Abstract: The interim rule sets forth the process for reviewing and addressing actual or potential conflicts of interest among any individuals or entities seeking or having a...

  8. Project International Emphasis Interim Report, July 1991.

    ERIC Educational Resources Information Center

    Blois, Beverly, Ed.; Williams, Barbara

    Project International Emphasis (PIE), a curriculum development effort involving all 24 colleges in the Virginia Community College System (VCCS), focuses on the infusion of globally oriented components across the academic curriculum and in related career development programs. Activities undertaken during the project's first year included an annual…

  9. 13 CFR 120.891 - Certifications of disbursement and completion.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false Certifications of disbursement and completion. 120.891 Section 120.891 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.891 Certifications of disbursement...

  10. 13 CFR 120.891 - Certifications of disbursement and completion.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 13 Business Credit and Assistance 1 2012-01-01 2012-01-01 false Certifications of disbursement and completion. 120.891 Section 120.891 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.891 Certifications of disbursement...

  11. 13 CFR 120.891 - Certifications of disbursement and completion.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Certifications of disbursement and completion. 120.891 Section 120.891 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.891 Certifications of disbursement...

  12. 13 CFR 120.891 - Certifications of disbursement and completion.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Certifications of disbursement and completion. 120.891 Section 120.891 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.891 Certifications of disbursement...

  13. 13 CFR 120.891 - Certifications of disbursement and completion.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 13 Business Credit and Assistance 1 2013-01-01 2013-01-01 false Certifications of disbursement and completion. 120.891 Section 120.891 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.891 Certifications of disbursement...

  14. 76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Adult Detention Facility Guidelines AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and... Indian Affairs Web site. DATES: These Interim BIA Adult Detention Facility Guidelines and Interim Model...

  15. Recent developments - US spent fuel disposition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    One of a US utility's major risk factors in continuing to operate a nuclear plant is managing discharged spent fuel. The US Department of Energy (DOE) signed contracts with utilities guaranteeing government acceptance of spent fuel by 1988. However, on December 17, 1992, DOE Secretary Watkins wrote to Sen. J. Bennett Johnston (D-LA), Chairman of the Senate Energy Committee, indicating a reassessment of DOE's programs, the results of which will be presented to Congress in January 1993. He indicated the Department may not be able to meet the 1988 date, because of difficulty in finding a site for the Monitoredmore » Retrievable Storage facility. Watkins indicated that DOE has investigated an interim solution and decided to expedite a program to certify a multi-purpose standardized cask system for spent fuel receipt, storage, transport, and disposal. To meet the expectations of US utilities, DOE is considering a plan to use federal sites for interim storage of the casks. Secretary Watkins recommended the waste program be taken off-budget and put in a revolving fund established to ensure that money already collected from utilities will be available to meet the schedule for completion of the repository.« less

  16. Patient Protection and Affordable Care Act; program integrity: exchange, premium stabilization programs, and market standards; amendments to the HHS notice of benefit and payment parameters for 2014. Final rule.

    PubMed

    2013-10-30

    This final rule implements provisions of the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010 (collectively referred to as the Affordable Care Act). Specifically, this final rule outlines financial integrity and oversight standards with respect to Affordable Insurance Exchanges, qualified health plan (QHP) issuers in Federally-facilitated Exchanges (FFEs), and States with regard to the operation of risk adjustment and reinsurance programs. It also establishes additional standards for special enrollment periods, survey vendors that may conduct enrollee satisfaction surveys on behalf of QHP issuers, and issuer participation in an FFE, and makes certain amendments to definitions and standards related to the market reform rules. These standards, which include financial integrity provisions and protections against fraud and abuse, are consistent with Title I of the Affordable Care Act. This final rule also amends and adopts as final interim provisions set forth in the Amendments to the HHS Notice of Benefit and Payment Parameters for 2014 interim final rule, published in the Federal Register on March 11, 2013, related to risk corridors and cost-sharing reduction reconciliation.

  17. The cost and impact of the interim federal health program cuts on child refugees in Canada.

    PubMed

    Evans, Andrea; Caudarella, Alexander; Ratnapalan, Savithiri; Chan, Kevin

    2014-01-01

    On June 30, 2012, Interim Federal Health Program (IFHP) funding was cut for refugee claimant healthcare. The potential financial and healthcare impacts of these cuts on refugee claimants are unknown. We conducted a one-year retrospective chart review spanning 6 months before and after IFHP funding cuts at The Hospital for Sick Children, a tertiary care children's hospital in Toronto. We analyzed emergency room visits characteristics, admission rates, reasons for admission, and financial records including billing from Medavie Blue Cross. There were 173 refugee children visits to the emergency room in the six months before and 142 visits in the six months after funding cuts. The total amount billed to the IFHP program during the one-year of this study was $131,615. Prior to the IFHP cuts, 46% of the total emergency room bills were paid by IFHP compared to 7% after the cuts (p<0.001). After the cuts to the IFHP, The Hospital for Sick Children was unable to obtain federal health coverage for the vast majority of refugee claimant children registered under the IFHP. This preliminary analysis showed that post-IFHP cuts healthcare costs at the largest tertiary pediatric institution in the country increased.

  18. Deep Vadose Zone Treatability Test for the Hanford Central Plateau: Interim Post-Desiccation Monitoring Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Truex, Michael J.; Oostrom, Martinus; Strickland, Christopher E.

    2013-09-01

    A field test of desiccation is being conducted as an element of the deep vadose zone treatability test program. Desiccation technology relies on removal of water from a portion of the subsurface such that the resultant low moisture conditions inhibit downward movement of water and dissolved contaminants. Previously, a field test report (Truex et al. 2012a) was prepared describing the active desiccation portion of the test and initial post-desiccation monitoring data. Additional monitoring data have been collected at the field test site during the post-desiccation period and is reported herein along with interpretation with respect to desiccation performance. This ismore » an interim report including about 2 years of post-desiccation monitoring data.« less

  19. Nondiscrimination on the basis of handicap--Office of the Secretary, HHS. Interim final rule.

    PubMed

    1983-03-07

    The interim final rule modifies existing regulations to meet the exigent needs that can arise when a handicapped infant is discriminatorily denied food or other medical care. Three current regulatory provisions are modified to allow timely reporting of violations, expeditious investigation, and immediate enforcement action when necessary to protect a handicapped infant whose life is endangered by discrimination in a program or activity receiving federal financial assistance. Recipients that provide health care to infants will be required to post a conspicuous notice in locations that provide such care. The notice will describe the protections under federal law against discrimination toward the handicapped, and will provide a contact point in the Department of HHS for reporting violations immediately by telephone.

  20. Longitudinal Evaluation of 2 + 2 Career-Vocational Education Articulation Projects. First Year Interim Report.

    ERIC Educational Resources Information Center

    Evaluation and Training Inst., Los Angeles, CA.

    Twenty-one California career-vocational educational articulation projects, commonly referred to as 2 + 2 partnerships, were jointly funded across the 1986-89 funding period and third-party evaluations were conducted in 1988-89. The longitudinal study examined the long-term effects of the original partnerships. Evaluators formed an advisory…

  1. Evaluation of the 5.8-mile highway light system for guidance in fog on Afton Mountain.

    DOT National Transportation Integrated Search

    1976-01-01

    This report presents the results of an evaluation of the 5.8-mile fog guidance light system on I-64 across Afton Mountain. It is a companion to "Interim Report No. 3, Evaluation of Pavement Edge Inset and Low Level Illumination Lights in Fog," which ...

  2. 78 FR 49782 - Interim Staff Guidance on Changes During Construction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... seven comments on the Draft ISG from the Nuclear Energy Institute (NEI) (ADAMS Accession No. ML12089A019... construction impacts evaluation and the 10 CFR 50.59- like review (including applicability determination..., the construction impacts evaluation and the 10 CFR 50.59 and 10 CFR 50-59-like evaluation (including...

  3. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...

  4. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...

  5. Predicting moisture-induced damage to asphaltic concrete : field evaluation phase, interim report.

    DOT National Transportation Integrated Search

    1977-01-01

    Virginia is one of seven state and federal agencies participating in a field evaluation of a stripping test method developed under NCHRP Project 4-8 (3), "Predicting Moisture- Induced Damage to Asphaltic Concrete." The test method is being used to ev...

  6. Evaluation of thin epoxy system overlays for concrete bridge decks : interim report No. 1.

    DOT National Transportation Integrated Search

    1986-05-01

    Four epoxy overlay systems were applied to concrete bridge decks in north Louisiana to evaluate their performance as skid resistant surfaces primarily and also as concrete sealers. Dural Flexolith, Poly-Carb Flexogrid, and Con/Chem Cono/Crete were pl...

  7. Sample size determination in group-sequential clinical trials with two co-primary endpoints

    PubMed Central

    Asakura, Koko; Hamasaki, Toshimitsu; Sugimoto, Tomoyuki; Hayashi, Kenichi; Evans, Scott R; Sozu, Takashi

    2014-01-01

    We discuss sample size determination in group-sequential designs with two endpoints as co-primary. We derive the power and sample size within two decision-making frameworks. One is to claim the test intervention’s benefit relative to control when superiority is achieved for the two endpoints at the same interim timepoint of the trial. The other is when the superiority is achieved for the two endpoints at any interim timepoint, not necessarily simultaneously. We evaluate the behaviors of sample size and power with varying design elements and provide a real example to illustrate the proposed sample size methods. In addition, we discuss sample size recalculation based on observed data and evaluate the impact on the power and Type I error rate. PMID:24676799

  8. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-07

    ... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites AGENCY... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response... interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer...

  9. 24 CFR 35.120 - Options.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Options. 35.120 Section 35.120... and Definitions for All Programs. § 35.120 Options. (a) Standard treatments. Where interim controls are required by this part, the designated party has the option to presume that lead-based paint or...

  10. 76 FR 28661 - Interim Final Determination To Defer Sanctions, Sacramento Metro 1-Hour Ozone Nonattainment Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... Determination To Defer Sanctions, Sacramento Metro 1-Hour Ozone Nonattainment Area, California AGENCY... Act (CAA) Section 185 fee program (Termination Determination) for the Sacramento Metro 1- hour Ozone nonattainment area (Sacramento Metro Area) to satisfy anti- backsliding requirements for the 1-hour Ozone...

  11. Tri-level study of the causes of traffic accidents : interim report 1. Vol. 1, research findings

    DOT National Transportation Integrated Search

    1973-08-31

    This is the final report of the first year of activity under a proposed three-year program entitled "Tri-Level Study of the Causes of Traffic Accidents." This study has been performed by the Indiana University institute for Research in Public Safety ...

  12. Cognitive Awareness Research in the Classroom

    ERIC Educational Resources Information Center

    Hogg, James H.

    1975-01-01

    A descriptive study to determine the continued effectiveness of a program of cognitive verbal awareness training was carried out over a three year period. It was found that ability to use cognitive verbalizations above the level of stating, or eliciting information remained whether or not interim feedback was given. (Author)

  13. Tri-level study of the causes of traffic accidents : interim report 1. Vol. 2 : appendices

    DOT National Transportation Integrated Search

    1973-08-31

    This is the final report of the first year of activity under a proposed three-year program entitled "Tri-Level Study of the Causes of Traffic Accidents." This study has been performed by the Indiana University Institute for Research in Public Safety ...

  14. 40 CFR 258.58 - Implementation of the corrective action program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Take any interim measures necessary to ensure the protection of human health and the environment... drinking water supplies or sensitive ecosystems; (iv) Further degradation of the ground-water that may... situations that may pose threats to human health and the environment. (b) An owner or operator may determine...

  15. The Interim Years of Cyberspace

    DTIC Science & Technology

    2013-02-01

    Atlantic Treaty Organization even went so far as to state that the Stuxnet worm could have caused “a new Chernobyl ” if the program had released the...Messmer, “Stuxnet Could Have Caused ‘New Chernobyl ,’ Russian Ambassador Says,” Network World, 27 January 2011, http://www.networkworld.com/news/2011/012711

  16. Wide Area Recovery and Resiliency Program (WARRP) Interim Clearance Strategy for Environments Contaminated with Cesium-137

    DTIC Science & Technology

    2012-07-01

    Goiania) and those containing 137Cs and other radionuclides ( Chernobyl ). Another group contains documents relevant to site survey 3 procedures...residents of the contaminated areas. Recovery experience from the Chernobyl incident have demonstrated that direct involvement of inhabitants and local

  17. Wide Area Recovery and Resiliency Program (WARRP) Interim Clearance Strategy for Environments Contaminated with Hazardous Chemicals

    DTIC Science & Technology

    2012-07-01

    on the cleanup of specific sites: those containing only cesium-137 (Goiania) and those containing 137Cs and other radionuclides ( Chernobyl ...targets and consider initiatives to enhance the quality of life of the residents of the contaminated areas. Recovery experience from the Chernobyl

  18. Heat-straightening effects on the behavior of plates and rolled shapes : volume 2 : second interim report of phase 1.

    DOT National Transportation Integrated Search

    1987-08-01

    One of the primary reasons that highway departments are hesitant to use heat-straightening techniques to repair damaged steel girders is the lack of experimental verification of the process. A comprehensive experimental program on the subject has bee...

  19. School, Work and Family Planning. Interim Impacts in Project Redirection.

    ERIC Educational Resources Information Center

    Polit, Denise F.; And Others

    Project Redirection was designed to help pregnant and parenting adolescents progress toward eventual self-sufficiency by linking them with community agencies and volunteers at four geographically and ethnically diverse sites in the United States. Distinctive features of the program include: (1) a broad scope of services including employability…

  20. 75 FR 16564 - High-Speed Intercity Passenger Rail (HSIPR) Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ... services to avoid shipping delays. Application forms are available at http://www.fra.dot.gov/Pages/2243..., and 501--Intercity Passenger Rail Service Corridor Capital Assistance (codified at 49 U.S.C. chapter... High Speed Rail Corridors and Intercity Passenger Rail Service.'' This document incorporates interim...

Top