Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan
NASA Technical Reports Server (NTRS)
Zeidler, Janet
1999-01-01
Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.
Merrick, Elizabeth Levy; Horgan, Constance M; Garnick, Deborah W; Hodgkin, Dominic; Morley, Melissa
2008-01-01
Although the disease management industry has expanded rapidly, there is little nationally representative data regarding medical and behavioral health disease management programs at the health plan level. National estimates from a survey of private health plans indicate that 90% of health plan products offered disease management for general medical conditions such as diabetes but only 37% had depression programs. The frequency of specific depression disease management activities varied widely. Program adoption was significantly related to product type and behavioral health contracting. In health plans, disease management has penetrated more slowly into behavioral health and depression program characteristics are highly variable.
Merrick, Elizabeth Levy; Horgan, Constance M.; Garnick, Deborah W.; Hodgkin, Dominic; Morley, Melissa
2015-01-01
While the disease management industry has expanded rapidly, there is little nationally representative data regarding medical and behavioral health disease management programs at the health plan level. National estimates from a survey of private health plans indicate that 90% of health plan products offered disease management for general medical conditions such as diabetes, but only 37% had depression programs. The frequency of specific depression disease management activities varied widely. Program adoption was significantly related to product type and behavioral health contracting. In health plans, disease management has penetrated more slowly into behavioral health, and depression program characteristics are highly variable. PMID:18806594
Harrison, Donald L
2007-01-01
To assess the impact of formal education program participation on the attitudes and perceptions of independent community pharmacy owners/managers toward strategic planning. Cross-sectional study. United States; June 4-July 30, 2004. Nationwide random sample of 1,250 owners/managers of independent community pharmacies. Mailed survey. Strategic planning formal education program participation. Comprehensiveness of strategic planning. Attitudes and perceptions of owners/managers of independent community pharmacies toward strategic planning. A total of 527 (42.1%) usable questionnaires were returned. Only 124 (23.5%) respondents indicated that they participated in a formal strategic planning education program. However, of the 141 (26.85%) respondents who indicated that they had conducted strategic planning for their community pharmacy, 111 (89.5%) had participated in a formal strategic planning education program. A significant association was detected between formal education program participation and the conducting of strategic planning (P< or =0.0001). Significant differences were observed for all attitudes and perceptions of independent community pharmacy owners/managers toward strategic planning based on program participation (P< or =0.0001). Finally, respondents who indicated that they had participated in a formal education program had a significantly higher comprehensiveness of strategic planning rating than those respondents who did not participate in an educational program (P< or =0.0001). A significant association exists between formal strategic planning education program participation and the conducting of strategic planning by owner/managers of independent community pharmacies, and those participating in such programs have significantly different attitudes and perceptions toward the conducting of strategic planning and have a significantly higher comprehensiveness of strategic planning rating.
15 CFR 923.13 - Energy facility planning process.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...
15 CFR 923.13 - Energy facility planning process.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...
15 CFR 923.13 - Energy facility planning process.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...
15 CFR 923.13 - Energy facility planning process.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...
15 CFR 923.13 - Energy facility planning process.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...
41 CFR 105-72.305 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Management § 105-72.305 Revision of budget and program plans. (a) The budget plan is the financial expression... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Revision of budget and program plans. 105-72.305 Section 105-72.305 Public Contracts and Property Management Federal Property...
The need for coherence between waterfowl harvest and habitat management
Runge, M.C.; Johnson, F.A.; Anderson, M.G.; Koneff, M.D.; Reed, E.T.; Mott, S.E.
2006-01-01
Two of the most significant management efforts affecting waterfowl populations in North America are the North American Waterfowl Management Plan (the Plan) and Federal harvest management programs. Both the Plan and harvest management are continental in scope, involve an extensive group of stakeholders, and rely on adaptive processes of biological planning, implementation, and evaluation. The development of these programs has occurred independently, however, and there has been little explicit recognition that both harvest and habitat effects should be considered for coherent management planning and evaluation. For example, the harvest strategy can affect whether population objectives of the Plan are met, irrespective of the success of the Plan's habitat conservation efforts. Conversely, habitat conservation activities under the Plan can influence harvest potential and, therefore, the amount of hunting opportunity provided. It seems increasingly clear that the Plan's waterfowl population objectives can only be useful for conservation planning and evaluation if they are accompanied by an explicit specification of the harvest strategy and environmental conditions under which they are to be achieved. This clarification also is necessary to ensure that Plan population objectives are not attained solely through the reduction of hunting opportunity. We believe then that it is imperative that these key waterfowl-management programs work to harmonize their objectives. Harvest management programs and the Plan ought to be working toward the same ends, but that is not possible so long as the mutually reinforcing relationship of these programs is obscured by ambiguities in their management objectives.
2 CFR 215.25 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false Revision of budget and program plans. 215.25 Section 215.25 Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET CIRCULARS AND GUIDANCE Reserved... Program Management § 215.25 Revision of budget and program plans. (a) The budget plan is the financial...
7 CFR 225.5 - Payments to State agencies and use of Program funds.
Code of Federal Regulations, 2010 CFR
2010-01-01
... the State Program management and administration plan and any other information available to FNS. If a... Program management and administration plan. (3) Funding assurance. At the time FNS approves the State's management and administration plan, the State shall be assured of receiving State administrative funding...
7 CFR 225.5 - Payments to State agencies and use of Program funds.
Code of Federal Regulations, 2011 CFR
2011-01-01
... the State Program management and administration plan and any other information available to FNS. If a... Program management and administration plan. (3) Funding assurance. At the time FNS approves the State's management and administration plan, the State shall be assured of receiving State administrative funding...
strategic scenario planning and analysis Program portfolio analysis Program management, planning and strategic execution Change management and operational improvement Research Interests Bioenergy supply chains management, organizational improvement, and program and project management. Prior Work Experience Consultant
44 CFR 9.15 - Planning programs affecting land use.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Planning programs affecting..., DEPARTMENT OF HOMELAND SECURITY GENERAL FLOODPLAIN MANAGEMENT AND PROTECTION OF WETLANDS § 9.15 Planning... flood hazards and floodplain management and wetlands protection; and (b) Prescribes planning procedures...
Results from a national survey on chronic care management by health plans.
Mattke, Soeren; Higgins, Aparna; Brook, Robert
2015-05-01
The growing burden of chronic disease necessitates innovative approaches to help patients and to ensure the sustainability of our healthcare system. Health plans have introduced chronic care management models, but systematic data on the type and prevalence of different approaches are lacking. Our goal was to conduct a systematic examination of chronic care management programs offered by health plans in the commercial market (ie, in products sold to employers and individuals. We undertook a national survey of a representative sample of health plans (70 plans, 36% response rate) and 6 case studies on health plans' programs to improve chronic care in the commercial market. The data underwent descriptive and bivariate analyses. All plans, regardless of size, location, and ownership, offer chronic care management programs, which identify eligible members from claims data and match them to interventions based on overall risk and specific care gaps. Plans then report information on care gaps to providers and offer self-management support to their members. While internal evaluations suggest that the interventions improve care and reduce cost, plans report difficulties in engaging members and providers. To overcome those obstacles, plans are integrating their programs into provider work flow, collaborating with providers on care redesign and leveraging patient support technologies. Our study shows that chronic care management programs have become a standard component of the overall approach used by health plans to manage the health of their members.
Contracts and Management Services FY 1996 Site Support Program Plan: WBS 6.10.14. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Knoll, J.M. Jr.
1995-09-01
This is the Contracts and Management Services site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail including cost accounting narrative summary, approved funding budget, and activity detailed description.
40 CFR 130.11 - Program management.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Program management. 130.11 Section 130... PLANNING AND MANAGEMENT § 130.11 Program management. (a) State agencies may apply for grants under sections 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate...
40 CFR 130.11 - Program management.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Program management. 130.11 Section 130... PLANNING AND MANAGEMENT § 130.11 Program management. (a) State agencies may apply for grants under sections 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate...
40 CFR 130.11 - Program management.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Program management. 130.11 Section 130... PLANNING AND MANAGEMENT § 130.11 Program management. (a) State agencies may apply for grants under sections 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate...
40 CFR 130.11 - Program management.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Program management. 130.11 Section 130... PLANNING AND MANAGEMENT § 130.11 Program management. (a) State agencies may apply for grants under sections 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate...
Configuration Management Plan for K Basins
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weir, W.R.; Laney, T.
This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less
43 CFR 1610.4 - Resource management planning process.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...
43 CFR 1610.4 - Resource management planning process.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...
43 CFR 1610.4 - Resource management planning process.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...
43 CFR 1610.4 - Resource management planning process.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...
SDDOT transportation systems management & operations program plan.
DOT National Transportation Integrated Search
2016-06-01
The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...
77 FR 54615 - Strategic Management Program; Fiscal Year 2013-2016 Strategic Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-05
... Manager, Strategic Management Program; National Transportation Safety Board, 490 L'Enfant Plaza SW., MD-1... NATIONAL TRANSPORTATION SAFETY BOARD Strategic Management Program; Fiscal Year 2013-2016 Strategic Plan AGENCY: National Transportation Safety Board. ACTION: Notice: Request for comments. SUMMARY: This...
Code of Federal Regulations, 2010 CFR
2010-07-01
... TEACHER QUALITY ENHANCEMENT GRANTS PROGRAM General Provisions § 611.2 What management plan must be... 34 Education 3 2010-07-01 2010-07-01 false What management plan must be included in a Teacher Quality Enhancement Grants Program application? 611.2 Section 611.2 Education Regulations of the Offices...
Azorbo, S; Muna, C
1993-01-01
The training and technical assistance programs of the Center for African Family Studies (CAFS), which is part of the International Planned Parenthood Federation for the African Region, were described. Programs included service delivery, management development, family life education, family planning communication, and research monitoring and evaluation. Several courses were offered: a week-long contraceptive technology update course for trainers and supervisors of family planning programs. Management training needs were filled through a 6-week middle level management course, a 2-week senior level management course, a 4-week community based family planning program course, a 6-week financial management of family planning and reproductive health programs course, and a 5-week course in leadership skills for management of women and health programs. Family life education courses were offered under the CAFS Women and Health Program for teachers, curriculum developers, youth leaders, and those working with young people for 3 weeks. Course issues of discussion included population and development, the family in contemporary African life, and policy legislation and laws to promote young people's health and social psychological and ethical aspects of adolescent sexuality. Family planning communication training programs were directed to strengthening IEC knowledge and skills over a 4-week period for senior and middle level personnel. The 3-week press course aimed to train journalists in print and electronic media for French-speaking countries who could gain cover population and family planning issues. The family planning research and evaluation course over 4 weeks aimed to increase the knowledge and skills of health personnel in project design, implementation, monitoring, and evaluation, in order to conduct assessment of program effectiveness. The course was directed to senior and middle level manager researchers, population project directors, and personnel of women-centered projects.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-16
... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project--Post-2017 Application of the Energy Planning and Management Program Power Marketing Initiative AGENCY: Western Area... and Management Program (Program) Power Marketing Initiative (PMI) (10 CFR part 905) to the Boulder...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-24
... Management Program Power Marketing Initiative to the Boulder Canyon Project AGENCY: Western Area [email protected] . Information regarding Western's Boulder Canyon Project (BCP) Post-2017 remarketing efforts, the Energy Management and Planning Program (Program), and the Conformed General Consolidated Power...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants (section 205(j)(2)) § 35.410 Purpose. (a) Purpose of section. Sections 35.410 through 35.418 govern Water Quality Management Planning... the Act. (b) Purpose of program. EPA awards Water Quality Management Planning Grants to carry out...
Code of Federal Regulations, 2011 CFR
2011-07-01
... ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants (section 205(j)(2)) § 35.410 Purpose. (a) Purpose of section. Sections 35.410 through 35.418 govern Water Quality Management Planning... the Act. (b) Purpose of program. EPA awards Water Quality Management Planning Grants to carry out...
Code of Federal Regulations, 2012 CFR
2012-07-01
... ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants (section 205(j)(2)) § 35.410 Purpose. (a) Purpose of section. Sections 35.410 through 35.418 govern Water Quality Management Planning... the Act. (b) Purpose of program. EPA awards Water Quality Management Planning Grants to carry out...
Code of Federal Regulations, 2014 CFR
2014-07-01
... ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants (section 205(j)(2)) § 35.410 Purpose. (a) Purpose of section. Sections 35.410 through 35.418 govern Water Quality Management Planning... the Act. (b) Purpose of program. EPA awards Water Quality Management Planning Grants to carry out...
Code of Federal Regulations, 2013 CFR
2013-07-01
... ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants (section 205(j)(2)) § 35.410 Purpose. (a) Purpose of section. Sections 35.410 through 35.418 govern Water Quality Management Planning... the Act. (b) Purpose of program. EPA awards Water Quality Management Planning Grants to carry out...
Technology to Market subprogram. Sue focuses on effective management, planning, milestone tracking, reporting Market programs, the Federal Energy Management Program Office, and the Office of Strategic Programs administration, planning and financial analysis. Education Human Resources Management, Employee Relations and
Continental United States Military Housing Inspection National Capital Region
2015-08-13
that was flaking, peeling, or chalking. JBAB did not have an asbestos management program, plan, or an appointed asbestos program manager...housing partner to ensure inspection and maintenance plan is achieved; and • Implement an asbestos management plan and appoint an asbestos program...select environmental health and safety requirements, such as those for drinking water, radon, asbestos , and lead based paint. We conducted this
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-27
... Management Program Power Marketing Initiative to the Boulder Canyon Project AGENCY: Western Area Power...), will apply the Energy Planning and Management Program (Program) Power Marketing Initiative (PMI), as modified in this notice, to the Boulder Canyon Project (BCP), as proposed in a Federal Register notice (FRN...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.
Endocrine Disruptor Screening Program (EDSP) Comprehensive Management Plans
The EDSP Comprehensive Management Plan describes the technical review processes that will be used in implementing this program and how the agency intends to factor technology advancements into the program.
Fact Sheet: Risk Management Plan (RMP) Audit Program
Risk management programs, which consist of a hazard assessment, a prevention program, and an emergency response program; must be periodically audited to assess whether the plans are adequate or need to be revised to comply with the regulation.
DOT National Transportation Integrated Search
2016-02-01
The Washington State Department of Transportation (WSDOT) regional planning programs address current and forecasted deficiencies of State highways through the conduct of corridor studies. This Guidance for the conduct of corridor planning studies is ...
40 CFR 60.2899 - What is a waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60.2899 Section 60.2899 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...
ERIC Educational Resources Information Center
National Alliance of Business, Inc., Washington, DC.
This Planning, Management, and Evaluation (PME) guide was developed by the National Alliance of Business as part of its program of management assistance for Private Industry Councils (PICs). The guide is a tool which PICs can use to improve their capability to plan, manage, and evaluate the programs which they administer, and to establish locally…
Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-10-01
The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.« less
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pava, Daniel S.
This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) andmore » integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.« less
40 CFR 130.0 - Program summary and purpose.
Code of Federal Regulations, 2010 CFR
2010-07-01
... QUALITY PLANNING AND MANAGEMENT § 130.0 Program summary and purpose. (a) This subpart establishes policies and program requirements for water quality planning, management and implementation under sections 106, 205(j), non-construction management 205(g), 208, 303 and 305 of the Clean Water Act. The Water Quality...
40 CFR 130.0 - Program summary and purpose.
Code of Federal Regulations, 2014 CFR
2014-07-01
... QUALITY PLANNING AND MANAGEMENT § 130.0 Program summary and purpose. (a) This subpart establishes policies and program requirements for water quality planning, management and implementation under sections 106, 205(j), non-construction management 205(g), 208, 303 and 305 of the Clean Water Act. The Water Quality...
40 CFR 130.0 - Program summary and purpose.
Code of Federal Regulations, 2012 CFR
2012-07-01
... QUALITY PLANNING AND MANAGEMENT § 130.0 Program summary and purpose. (a) This subpart establishes policies and program requirements for water quality planning, management and implementation under sections 106, 205(j), non-construction management 205(g), 208, 303 and 305 of the Clean Water Act. The Water Quality...
40 CFR 130.0 - Program summary and purpose.
Code of Federal Regulations, 2013 CFR
2013-07-01
... QUALITY PLANNING AND MANAGEMENT § 130.0 Program summary and purpose. (a) This subpart establishes policies and program requirements for water quality planning, management and implementation under sections 106, 205(j), non-construction management 205(g), 208, 303 and 305 of the Clean Water Act. The Water Quality...
Code of Federal Regulations, 2010 CFR
2010-07-01
... quality management plans. (1) In order to be approved the POTW Pretreatment Program shall be consistent with any approved water quality management plan developed in accordance with 40 CFR parts 130, 131, as revised, where such 208 plan includes Management Agency designations and addresses pretreatment in a...
43 CFR 1610.1 - Resource management planning guidance.
Code of Federal Regulations, 2011 CFR
2011-10-01
... interdisciplinary approach shall be used in the preparation, amendment and revision of resource management plans as... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING... and amendment of resource management plans may be provided by the Director and State Director, as...
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for child care and guidance management and services I and II. Presented first…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laney, T.
The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less
The components of action planning and their associations with behavior and health outcomes.
Lorig, Kate; Laurent, Diana D; Plant, Kathryn; Krishnan, Eswar; Ritter, Philip L
2014-03-01
Based on the works of Kiesler and Bandura, action plans have become important tools in patient self-management programs. One such program, shown effective in randomized trials, is the Internet Chronic Disease Self-Management Program. An implementation of this program, Healthy Living Canada, included detailed information on action plans and health-related outcome measures. Action plans were coded by type, and associations between action plans, confidence in completion and completion were examined. Numbers of Action Plans attempted and competed and completion rates were calculated for participants and compared to six-month changes in outcomes using regression models. Five of seven outcome measures significantly improved at six-months. A total of 1136 action plans were posted by 254 participants in 12 workshops (mean 3.9 out of 5 possible); 59% of action plans involved exercise, 16% food, and 14% role management. Confidence of completion was associated with completion. Action plan completion measures were associated with improvements in activity limitation, aerobic exercise, and self-efficacy. Baseline self-efficacy was associated with at least partial completion of action plans. Action planning appears to be an important component of self-management interventions, with successful completion associated with improved health and self-efficacy outcomes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schaus, P.S.
This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.
NASA Astrophysics Data System (ADS)
Fu, Z. H.; Zhao, H. J.; Wang, H.; Lu, W. T.; Wang, J.; Guo, H. C.
2017-11-01
Economic restructuring, water resources management, population planning and environmental protection are subjects to inner uncertainties of a compound system with objectives which are competitive alternatives. Optimization model and water quality model are usually used to solve problems in a certain aspect. To overcome the uncertainty and coupling in reginal planning management, an interval fuzzy program combined with water quality model for regional planning and management has been developed to obtain the absolutely ;optimal; solution in this study. The model is a hybrid methodology of interval parameter programming (IPP), fuzzy programing (FP), and a general one-dimensional water quality model. The method extends on the traditional interval parameter fuzzy programming method by integrating water quality model into the optimization framework. Meanwhile, as an abstract concept, water resources carrying capacity has been transformed into specific and calculable index. Besides, unlike many of the past studies about water resource management, population as a significant factor has been considered. The results suggested that the methodology was applicable for reflecting the complexities of the regional planning and management systems within the planning period. The government policy makers could establish effective industrial structure, water resources utilization patterns and population planning, and to better understand the tradeoffs among economic, water resources, population and environmental objectives.
Using the Program Sustainability Assessment Tool to Assess and Plan for Sustainability
Mainor, Avia; Moreland-Russell, Sarah; Maier, Ryan C.; Brossart, Laura; Luke, Douglas A.
2014-01-01
Implementing and growing a public health program that benefits society takes considerable time and effort. To ensure that positive outcomes are maintained over time, program managers and stakeholders should plan and implement activities to build sustainability capacity within their programs. We describe a 3-part sustainability planning process that programs can follow to build their sustainability capacity. First, program staff and stakeholders take the Program Sustainability Assessment Tool to measure their program’s sustainability across 8 domains. Next, managers and stakeholders use results from the assessment to inform and prioritize sustainability action planning. Lastly, staff members implement the plan and keep track of progress toward their sustainability goals. Through this process, staff can more holistically address the internal and external challenges and pressures associated with sustaining a program. We include a case example of a chronic disease program that completed the Program Sustainability Assessment Tool and engaged in program sustainability planning. PMID:24456644
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-28
... Management Program Power Marketing Initiative to the Boulder Canyon Project Post-2017 Remarketing AGENCY... Department of Energy (DOE), is withdrawing its decisions and proposals relating to its Boulder Canyon Project... . Information regarding Western's BCP Post-2017 marketing efforts, the Energy Management and Planning Program...
ERIC Educational Resources Information Center
Blaschke, Charles L.; Steiger, JoAnn
This report of a project to design a set of training guidelines for planning, managing, and evaluating cooperative education programs describes briefly the procedures used in developing the guidelines and model; discusses the various components of the planning, management, and evaluation process; and presents guidelines and criteria for designing…
40 CFR 130.6 - Water quality management plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...
40 CFR 130.6 - Water quality management plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...
40 CFR 130.6 - Water quality management plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...
Underground storage tank management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-09-01
The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective actionmore » is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.« less
Study of solid rocket motor for space shuttle booster, Volume 3: Program acquisition planning
NASA Technical Reports Server (NTRS)
1972-01-01
The program planning acquisition functions for the development of the solid propellant rocket engine for the space shuttle booster is presented. The subjects discussed are: (1) program management, (2) contracts administration, (3) systems engineering, (4) configuration management, and (5) maintenance engineering. The plans for manufacturing, testing, and operations support are included.
Guidelines for developing traffic incident management plans for work zones
DOT National Transportation Integrated Search
2003-09-01
The Colorado Department of Transportation (CDOT) has led the development of a number of traffic incident management plans and programs throughout the state. These programs address procedural and coordination aspects of managing unplanned events on th...
7 CFR 1948.78 - Growth management and housing planning projects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...
7 CFR 1948.78 - Growth management and housing planning projects.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 13 2013-01-01 2013-01-01 false Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...
7 CFR 1948.78 - Growth management and housing planning projects.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 13 2012-01-01 2012-01-01 false Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...
7 CFR 1948.78 - Growth management and housing planning projects.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 13 2011-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...
7 CFR 1948.78 - Growth management and housing planning projects.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 13 2014-01-01 2013-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...
5 CFR 930.301 - Information systems security awareness training program.
Code of Federal Regulations, 2011 CFR
2011-01-01
... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning..., risk management, and contingency planning. (b) Provide the Federal information systems security...
5 CFR 930.301 - Information systems security awareness training program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning..., risk management, and contingency planning. (b) Provide the Federal information systems security...
Rhode Island congestion management plan : executive summary
DOT National Transportation Integrated Search
1997-09-01
This document provides an overview of the Rhode Island Congestion Management System (CMS) program consisting of the following: Congestion Management System Plan; Incident Management Plan; and Intelligent Transportation System (ITS) Early Deployment P...
Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.
1992-10-01
The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.« less
Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan
NASA Technical Reports Server (NTRS)
Smith, Janice F. (Compiler); Forrest, Larry
1993-01-01
A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.
Integrating fire management analysis into land management planning
Thomas J. Mills
1983-01-01
The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...
15 CFR 923.24 - Shorefront access and protection planning.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Shorefront access and protection... COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Special Management Areas § 923.24 Shorefront access and protection planning. (a) The management program must include a definition of the term...
15 CFR 923.24 - Shorefront access and protection planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Shorefront access and protection... COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Special Management Areas § 923.24 Shorefront access and protection planning. (a) The management program must include a definition of the term...
15 CFR 923.24 - Shorefront access and protection planning.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Shorefront access and protection... COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Special Management Areas § 923.24 Shorefront access and protection planning. (a) The management program must include a definition of the term...
15 CFR 923.24 - Shorefront access and protection planning.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Shorefront access and protection... COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Special Management Areas § 923.24 Shorefront access and protection planning. (a) The management program must include a definition of the term...
15 CFR 923.24 - Shorefront access and protection planning.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Shorefront access and protection... COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Special Management Areas § 923.24 Shorefront access and protection planning. (a) The management program must include a definition of the term...
Atkinson, A.J.; Trenham, P.C.; Fisher, R.N.; Hathaway, S.A.; Johnson, B.S.; Torres, S.G.; Moore, Y.C.
2004-01-01
critical management uncertainties; and 3) implementing long-term monitoring and adaptive management. Ultimately, the success of regional conservation planning depends on the ability of monitoring programs to confront the challenges of adaptively managing and monitoring complex ecosystems and diverse arrays of sensitive species.
40 CFR 130.12 - Coordination with other programs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.12 Coordination with other programs. (a) Relationship... 208(e) of the Act, no NPDES permit may be issued which is in conflict with an approved Water Quality Management (WQM) plan. Where a State has assumed responsibility for the administration of the permit program...
Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-09-01
The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizesmore » current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.« less
10 CFR 436.2 - General objectives.
Code of Federal Regulations, 2010 CFR
2010-01-01
... OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS § 436.2 General objectives. The objectives of Federal energy management and planning programs are: (a) To apply energy... use of energy in all agency operations through general operations plans. [55 FR 48220, Nov. 20, 1990...
34 CFR 74.25 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 1 2010-07-01 2010-07-01 false Revision of budget and program plans. 74.25 Section 74... Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan...) Recipients are required to report deviations from budget and program plans, and request prior approvals for...
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for agriculture business and management (ABM) I and II. Presented first are a…
TWRS Configuration management program plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.
10 CFR 905.1 - What are the purposes of the Energy Planning and Management Program?
Code of Federal Regulations, 2010 CFR
2010-01-01
... Resource Planning, allows customers of the Western Area Power Administration (Western) to meet the objectives of section 114 of EPAct through integrated resource planning or by other means, such as attaining... purposes of the Energy Planning and Management Program (EPAMP) are to meet the objectives of Section 114 of...
Strategic Human Resources Management of Employer Cooperative Education Programs.
ERIC Educational Resources Information Center
Nielsen, Richard P.; Porter, Ralph C.
1982-01-01
This article discusses effective strategic planning and management of employer cooperative education programs. It examines types of planning, the need for such programs, and implementation strategies. Several case studies are considered: Dayton-Hudson, IBM, AT&T, Delta Airlines, and Rockwell International. (CT)
Fetterolf, Donald E; Terry, Rachel
2007-02-01
Oncologic conditions are ubiquitous medical illnesses that present a particular challenge for medical management programs designed to address quality and cost issues in patient populations. Disease management strategies represent a reasonable and effective approach for employers and health plans in their arsenal of health management strategies. Multiple reasons exist for the development of specialized disease management programs that deal with cancer patients, some unique to this group of individuals. Health plans and/or employers have solid justification for addressing these issues directly through programs developed specifically to work with cancer patients. Whether developed within a health plan, or "carved out" to an external vendor, proper evaluation of outcomes is essential.
Schwerner, Henry; Mellody, Timothy; Goldstein, Allan B; Wansink, Daryl; Sullivan, Virginia; Yelenik, Stephan N; Charlton, Warwick; Lloyd, Kelley; Courtemanche, Ted
2006-02-01
The objective of this study was to observe trends in payer expenditures for plan members with one of 14 chronic, complex conditions comparing one group with a disease management program specific to their condition (the intervention group) and the other with no specific disease management program (the control group) for these conditions. The authors used payer claims and membership data to identify members eligible for the program in a 12-month baseline year (October 2001 to September 2002) and a subsequent 12-month program year (October 2002 to September 2003). Two payers were analyzed: one health plan with members primarily in New Jersey (AmeriHealth New Jersey [AHNJ]), where the disease management program was offered, and one affiliated large plan with members primarily in the metro Philadelphia area, where the program was not offered. The claims payment policy for both plans is identical. Intervention and control groups were analyzed for equivalence. The analysis was conducted in both groups over identical time periods. The intervention group showed statistically significant (p < 0.01) differences in total paid claims trend and expenditures when compared to the control group. Intervention group members showed a reduction in expenditures of -8%, while control group members showed an increase of +10% over identical time periods. Subsequent analyses controlling for outliers and product lines served to confirm the overall results. The disease management program is likely responsible for the observed difference between the intervention and control group results. A well-designed, targeted disease management program offered by a motivated, supportive health plan can play an important role in cost improvement strategies for members with complex, chronic conditions.
NASA Year 2000 (Y2K) Program Plan
NASA Technical Reports Server (NTRS)
1998-01-01
NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.
Timber management planning with timber ram and goal programming
Richard C. Field
1978-01-01
By using goal programming to enhance the linear programming of Timber RAM, multiple decision criteria were incorporated in the timber management planning of a National Forest in the southeastern United States. Combining linear and goal programming capitalizes on the advantages of the two techniques and produces operationally feasible solutions. This enhancement may...
24 CFR 84.25 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Revision of budget and program... and Program Management § 84.25 Revision of budget and program plans. (a) The budget plan is the... required to report deviations from budget and program plans, and request prior approvals for budget and...
Based upon the structure and specifications in ANSI/ASQC E4-1994, Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs, the Environmental Technology Verification (ETV) program Quality and Management Plan (QMP) f...
Performance measurement: A tool for program control
NASA Technical Reports Server (NTRS)
Abell, Nancy
1994-01-01
Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.
Performance-based planning and programming guidebook.
DOT National Transportation Integrated Search
2013-09-01
"Performance-based planning and programming (PBPP) refers to the application of performance management principles within the planning and programming processes of transportation agencies to achieve desired performance outcomes for the multimodal tran...
18 CFR 740.4 - State water management planning program.
Code of Federal Regulations, 2010 CFR
2010-04-01
...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify...
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kellie, C.L.
This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.
Tank waste remediation system configuration management implementation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
1998-03-31
The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less
Health plan approach to operationalizing a specialty drug management program.
Tegenu, Mesfin
2008-05-01
Expenditures related to specialty drugs consume a significant percentage of available health care resources. Explain the process of transitioning the management of specialty drugs from medical services to pharmacy services in 2 managed care plans and provide insight into the issues encountered and solutions implemented based on 6 years of experience using traditional and innovative pharmacy utilization management tools to insure appropriate specialty drug use and reimbursement. The level of involvement in a specialty management program varies from managing only products dispensed by the retail, mail, and specialty pharmacy vendor to encompassing a broad list of specialty drugs distributed through a variety of channels. Efficient administrative, operational, and clinical processes are critical to the success of the program. Additionally, an accurate and timely claims processing procedure is also essential for success as is the ability to mine data and effectively report on the use of specialty products. A clinically sound, cost-effective, and patient-friendly program requires input from health plan members, pharmacy service leaders, and physician providers, and must overcome challenges associated with disrupting current relationships and removing competing incentives. A well-constructed and properly funded specialty drug management program results in clinical and financial benefits for the plan.
Course Length Versus Course Price: Marketing Factors in Program Planning.
ERIC Educational Resources Information Center
Lamoureux, Marvin E.
Recent program planning literature involving adult education has attempted to draw upon techniques from marketing management. Most of the literature has, however, not explored the relationship between adult education program decision needs and fundamental marketing concepts. Adult educators and marketing managers are conducting similar daily…
32 CFR 239.13 - Program Performance Reviews.
Code of Federal Regulations, 2010 CFR
2010-07-01
... will prepare monthly program performance reviews using the Homeowners Assistance Program Management Information System; HQUSACE Annual Management Command Plan and Management Control Checklist. In addition...
ERIC Educational Resources Information Center
General Accounting Office, Washington, DC. Information Management and Technology Div.
This study, which was conducted to determine how effectively the U.S. Department of Education plans for and manages its information resources in supporting its mission and administering its programs, focused on the Department's strategic information resources management (IRM) planning process. Meetings were held with program officials to ascertain…
Modular space station, phase B extension. Program operations plan
NASA Technical Reports Server (NTRS)
1971-01-01
An organized approach is defined for establishing the most significant requirements pertaining to mission operations, information management, and computer program design and development for the modular space station program. The operations plan pertains to the space station and experiment module program elements and to the ground elements required for mission management and mission support operations.
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoffman, A.G.
This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.
Four years after the approval of its Comprehensive Conservation and Management Plan (CCMP), the San Juan Bay Estuary Program (SJBEP) is working towards the implementation stage of its 49 actions. During the last three years the program has focused its efforts in developing a coll...
Linear Programming for Vocational Education Planning. Interim Report.
ERIC Educational Resources Information Center
Young, Robert C.; And Others
The purpose of the paper is to define for potential users of vocational education management information systems a quantitative analysis technique and its utilization to facilitate more effective planning of vocational education programs. Defining linear programming (LP) as a management technique used to solve complex resource allocation problems…
Program Planning Concepts in Solid Waste Management
ERIC Educational Resources Information Center
Brown, Sanford M., Jr.
1972-01-01
Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)
45 CFR 1304.51 - Management systems and procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... control program quality, maintain program accountability, and advise governing bodies, policy groups, and... DELEGATE AGENCIES Program Design and Management § 1304.51 Management systems and procedures. (a) Program... program planning that includes consultation with the program's governing body, policy groups, and program...
NASA Technical Reports Server (NTRS)
Dickinson, William B.
1995-01-01
An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2010 CFR
2010-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2011 CFR
2011-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2012 CFR
2012-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2013 CFR
2013-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2014 CFR
2014-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.
DOE Office of Scientific and Technical Information (OSTI.GOV)
GREEN,T.ET AL.
2003-12-31
Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetationmore » of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.« less
43 CFR 1610.1 - Resource management planning guidance.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Resource management planning guidance. 1610.1 Section 1610.1 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING...
23 CFR 1200.25 - Improvement plan.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Implementation and Management of the Highway Safety Program § 1200.25 Improvement plan. If a review of the Annual... improvement plan. This plan will detail strategies, program activities, and funding targets to meet the...
5 CFR 930.301 - Information systems security awareness training program.
Code of Federal Regulations, 2012 CFR
2012-01-01
... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning... management; and management and implementation level training in system/application life cycle management...
78 FR 7476 - Airport Improvement Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-01
... of Airport Planning and Programming, Financial Assistance Division has updated and significantly.... San Martin, Manager, Airports Financial Assistance Division, Office of Airport Planning and... Airports, Airport Planning and Programming, Routing Symbol APP-501, 800 Independence Avenue SW., Room 619...
ERIC Educational Resources Information Center
Bhola, H. S.
Addressed to professionals involved in program evaluation, this working paper covers various aspects of evaluation planning, including the following: planning as a sociotechnical process, steps in evaluation planning, program planning and implementation versus evaluation planning and implementation, the literacy system and its subsystems, and some…
Repository-based software engineering program: Concept document
NASA Technical Reports Server (NTRS)
1992-01-01
This document provides the context for Repository-Based Software Engineering's (RBSE's) evolving functional and operational product requirements, and it is the parent document for development of detailed technical and management plans. When furnished, requirements documents will serve as the governing RBSE product specification. The RBSE Program Management Plan will define resources, schedules, and technical and organizational approaches to fulfilling the goals and objectives of this concept. The purpose of this document is to provide a concise overview of RBSE, describe the rationale for the RBSE Program, and define a clear, common vision for RBSE team members and customers. The document also provides the foundation for developing RBSE user and system requirements and a corresponding Program Management Plan. The concept is used to express the program mission to RBSE users and managers and to provide an exhibit for community review.
Code of Federal Regulations, 2010 CFR
2010-07-01
... also be eligible for funding under sections 104(b)(3) (Water Quality Cooperative Agreements and Wetlands Development Grants), 205(j)(2) (Water Quality Management Planning), and section 205(g) (State...) Associated program requirements. Program requirements for water quality planning and management activities...
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.
This document abstracts and reviews 32 publications that describe population education programs developed for Asia and the Pacific region. The documents are grouped under three sections: (1) management; (2) planning; and (3) monitoring/evaluation. Section 1 consists of 12 selected titles that deal with management of population education programs.…
J. John Stadt; Jim Schieck; Harry Stelfox
2006-01-01
The Alberta Biodiversity Monitoring Program is a rigorous science-based initiative that is being developed to monitor and report on biodiversity status and trends throughout the province of Alberta, Canada. Forest management plans in Alberta are required to monitor and report on the achievement of stated sustainable forest management objectives; however, the...
The planning and control of NASA programs and resources
NASA Technical Reports Server (NTRS)
1983-01-01
The major management systems used to plan and control NASA programs and resources are described as well as their integration to form the agency's general management approach in carrying out its mission. Documents containing more detailed descriptions of the processes and techniques involved in the agency's major management systems are listed.
76 FR 42536 - Real-Time System Management Information Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-19
...-Time System Management Information Program AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... Real-Time System Management Information Program and general information about current and planned... establishing requirements for the Real-Time System Management Information Program on November 8, 2010, at 75 FR...
The Development of a Planning, Programming and Budgeting System. Technical Report.
ERIC Educational Resources Information Center
Appelquist, Claes-Goran; Zandren, S.
In CERI's program on institutional management in higher education, eight universities were brought together to set up teams within their institutions to work on their respective pre-selected problem areas. The planning, programming and budgeting system (PPBS) was developed as a management tool which would improve effectiveness by increasing the…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-04
...'Neill, Planning and Program Management Team leader, FHWA-Tennessee Division Office, 404 BNA Drive, Suite 508, Nashville, TN 37217. SUPPLEMENTARY INFORMATION: The FHWA, in cooperation with the Tennessee... this proposed program.) Charles J. O'Neill, Planning and Program Management Team Leader, Nashville, TN...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-21
.... FOR FURTHER INFORMATION CONTACT: Mr. Charles J. O'Neill, Planning and Program Management Team Leader.... SUPPLEMENTARY INFORMATION: The FHWA, in cooperation with the Tennessee Department of Transportation, will... apply to this proposed program.) Charles J. O'Neill, Planning and Program Management Team Leader...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ball, T.; Brandt, C.; Calfee, J.
1994-03-01
The Data Management Plan and Functional System Design supports the Clinch River Remedial Investigation (CRRI) and Waste Area Grouping (WAG) 6 Environmental Monitoring Program. The objective of the Data Management Plan and Functional System Design is to provide organization, integrity, security, traceability, and consistency of the data generated during the CRRI and WAG 6 projects. Proper organization will ensure that the data are consistent with the procedures and requirements of the projects. The Information Management Groups (IMGs) for these two programs face similar challenges and share many common objectives. By teaming together, the IMGs have expedited the development and implementationmore » of a common information management strategy that benefits each program.« less
Nurse manager residency program: an innovative leadership succession plan.
Watkins, Amy; Wagner, Jennifer; Martin, Christina; Grant, Brandy; Maule, Katrina; Resh, Kimberly; King, Lisa; Eaton, Holly; Fetter, Katrina; King, Stacey L; Thompson, Elizabeth J
2014-01-01
To ensure succession planning within the ranks of nurse managers meet current and projected nursing management needs and organizational goals, we developed and implemented a nurse manager residency program at our hospital. By identifying, supporting, and mentoring clinical experts who express a desire and display an aptitude for nursing leadership, we are graduating individuals who can transition to a nurse manager position with greater ease and competence.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-27
... Management Program Plan. SUMMARY: In accordance with the Marine Mammal Protection Act (MMPA), as amended, and....S. Navy (Navy) to take marine mammals incidental to Navy training, maintenance, and research... Management Program (ICMP) Plan, which is intended for use as a planning tool to focus Navy monitoring...
Management Academy for Public Health: Creating Entrepreneurial Managers
Orton, Stephen; Umble, Karl; Zelt, Sue; Porter, Janet; Johnson, Jim
2007-01-01
The Management Academy for Public Health develops public health managers’ management skills. Ultimately, the program aims to develop civic entrepreneurs who can improve the efficiency and the effectiveness of their organizations. With help from a coach, teams write public health business plans to meet needs in their communities. An external evaluation found that 119 teams trained during the first 3 years of the program generated more than $6 million in enhanced revenue—including grants, contracts, and fees through their business plans—from $2 million in program funding. Approximately 38% of the teams expected to generate revenue from an academy business plan or a spin-off plan. Action-learning methods can help midcareer managers transfer their training to the workplace and build entrepreneurial skills. PMID:17329658
Developing an Information and Records Management Program.
ERIC Educational Resources Information Center
Rutledge, Juli G.; Kartis, Alexia M.
1984-01-01
The need for information controls for college records management programs and the elements of program organization, planning, and management are discussed. Conditions at institutions that indicate a flaw in information control are identified, along with the benefits of a sound records management program. The management of an information and…
30 CFR 75.161 - Plans for training programs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Plans for training programs. 75.161 Section 75... Provision] § 75.161 Plans for training programs. Each operator must submit to the district manager, of the Coal Mine Safety and Health District in which the mine is located, a program or plan setting forth what...
ERIC Educational Resources Information Center
Rothwell, William J.; Cookson, Peter S.
This book introduces key issues in program planning as practiced in business and educational settings. Two chapters in part 1 introduce two foundational models--Lifelong Education Program Planning (LEPP) model and Contingency-Based Program Planning--and provide background on models designed by Houle, Knowles, Boyle, and Nadler. Parts 2-5 focus on…
NASA Technical Reports Server (NTRS)
Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil
2007-01-01
The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.
Space shuttle program: Shuttle Avionics Integration Laboratory. Volume 7: Logistics management plan
NASA Technical Reports Server (NTRS)
1974-01-01
The logistics management plan for the shuttle avionics integration laboratory defines the organization, disciplines, and methodology for managing and controlling logistics support. Those elements requiring management include maintainability and reliability, maintenance planning, support and test equipment, supply support, transportation and handling, technical data, facilities, personnel and training, funding, and management data.
Ernest Orlando Lawrence Berkeley National Laboratory institutional plan, FY 1996--2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-11-01
The FY 1996--2001 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Laboratory Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It alsomore » summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.« less
Children/Youth Physical Fitness Program Management System.
ERIC Educational Resources Information Center
Mozzini, Lou; And Others
Intended for physical fitness program managers, this book presents a system through which these professionals can justify, evaluate, develop, supervise, and promote a sound physical fitness program. Sections address the management stages of: (1) program assessment; (2) program commitment; (3) physical fitness program planning; (4) program…
Site support program plan for ICF Kaiser Hanford Company
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dieterle, S.E.
1996-09-27
The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.
Training hospital managers for strategic planning and management: a prospective study.
Terzic-Supic, Zorica; Bjegovic-Mikanovic, Vesna; Vukovic, Dejana; Santric-Milicevic, Milena; Marinkovic, Jelena; Vasic, Vladimir; Laaser, Ulrich
2015-02-26
Training is the systematic acquisition of skills, rules, concepts, or attitudes and is one of the most important components in any organization's strategy. There is increasing demand for formal and informal training programs especially for physicians in leadership positions. This study determined the learning outcomes after a specific training program for hospital management teams. The study was conducted during 2006 and 2007 at the Centre School of Public Health and Management, Faculty of Medicine, University of Belgrade and included 107 participants involved in the management in 20 Serbian general hospitals. The management teams were multidisciplinary, consisting of five members on average: the director of the general hospital, the deputy directors, the head nurse, and the chiefs of support services. The managers attended a training program, which comprised four modules addressing specific topics. Three reviewers independently evaluated the level of management skills at the beginning and 12 months after the training program. Principal component analysis and subsequent stepwise multiple linear regression analysis were performed to determine predictors of learning outcomes. The quality of the SWOT (strengths, weaknesses, opportunities and threats) analyses performed by the trainees improved with differences between 0.35 and 0.49 on a Likert scale (p < 0.001). Principal component analysis explained 81% of the variance affecting their quality of strategic planning. Following the training program, the external environment, strategic positioning, and quality of care were predictors of learning outcomes. The four regression models used showed that the training program had positive effects (p < 0.001) on the ability to formulate a Strategic Plan comprising the hospital mission, vision, strategic objectives, and action plan. This study provided evidence that training for strategic planning and management enhanced the strategic decision-making of hospital management teams, which is a requirement for hospitals in an increasingly competitive, complex and challenging context. For the first time, half of state general hospitals involved in team training have formulated the development of an official strategic plan. The positive effects of the formal training program justify additional investment in future education and training.
TRU Waste Management Program. Cost/schedule optimization analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
24 CFR 570.415 - Community Development Work Study Program.
Code of Federal Regulations, 2010 CFR
2010-04-01
... and economic development, community planning, and community management. The primary objectives of the... economic development, community planning, and community management, and to provide a cadre of well... economic development, community planning, community management, land use and housing activities. Community...
76 FR 57100 - Natural Resource Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-15
..., Water Resource Protection and Improvement, Sustainable Land Use, and Natural Resource Management, are... for the management of biological, cultural, and water resources, recreation, reservoir lands planning... implementation of resource management programs and activities and approaches to planning the use of TVA reservoir...
36 CFR 219.14 - Involvement of State and local governments.
Code of Federal Regulations, 2011 CFR
2011-07-01
... OF AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Collaborative Planning for Sustainability § 219.14 Involvement of State and local governments. The responsible official... coordination of resource management plans or programs. ...
36 CFR 219.14 - Involvement of State and local governments.
Code of Federal Regulations, 2010 CFR
2010-07-01
... OF AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Collaborative Planning for Sustainability § 219.14 Involvement of State and local governments. The responsible official... coordination of resource management plans or programs. ...
43 CFR 1610.4-8 - Selection of resource management plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Selection of resource management plan. 1610.4-8 Section 1610.4-8 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING...
43 CFR 1610.5 - Resource management plan approval, use and modification.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Resource management plan approval, use and modification. 1610.5 Section 1610.5 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING...
Project Manager Personality as a Factor for Success
2008-03-01
the project manager includes planning , 1 organizing, directing, and controlling the project (Program Management Institute, 2004; Kerzner, 2006). By...programs identified 5 percent cost growth per year from 2004 to 2007, costing $165 billion dollars more than originally planned (United States...Bjeirmi, 1996) and point out that good project managers can "contribute to project success, but are unlikely to prevent failure" ( de Witt, 1988, p
Program Risk Planning with Risk as a Resource
NASA Technical Reports Server (NTRS)
Ray, Paul S.
1998-01-01
The current focus of NASA on cost effective ways of achieving mission objectives has created a demand for a change in the risk management process of a program. At present, there is no guidelines as to when risk taking is justified due to high cost for a marginal improvement in risk. As a remedial step, Dr. Greenfield of NASA, developed a concept of risk management with risk as a resource. In the report, the following topics are addressed: (1) the risk management approach; (2) planning risk and program life cycle; (3) key components of a typical program; (4) the risk trading methodology; (5) review and decision process; (6) merits of the proposed risk planning approach; and (7) recommendations.
Comparison of provider and plan-based targeting strategies for disease management.
Annis, Ann M; Holtrop, Jodi Summers; Tao, Min; Chang, Hsiu-Ching; Luo, Zhehui
2015-05-01
We aimed to describe and contrast the targeting methods and engagement outcomes for health plan-delivered disease management with those of a provider-delivered care management program. Health plan epidemiologists partnered with university health services researchers to conduct a quasi-experimental, mixed-methods study of a 2-year pilot. We used semi-structured interviews to assess the characteristics of program-targeting strategies, and calculated target and engagement rates from clinical encounter data. Five physician organizations (POs) with 51 participating practices implemented care management. Health plan member lists were sent monthly to the practices to accept patients, and then the practices sent back data reports regarding targeting and engagement in care management. Among patients accepted by the POs, we compared those who were targeted and engaged by POs with those who met health plan targeting criteria. The health plan's targeting process combined claims algorithms and employer group preferences to identify candidates for disease management; on the other hand, several different factors influenced PO practices' targeting approaches, including clinical and personal knowledge of the patients, health assessment information, and availability of disease-relevant programs. Practices targeted a higher percentage of patients for care management than the health plan (38% vs 16%), where only 7% of these patients met the targeting criteria of both. Practices engaged a higher percentage of their targeted patients than the health plan (50% vs 13%). The health plan's claims-driven targeting approach and the clinically based strategies of practices both provide advantages; an optimal model may be to combine the strengths of each approach to maximize benefits in care management.
48 CFR 919.7011 - Developmental assistance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... limited to: (1) Management guidance relating to: (i) Financial management, (ii) Organizational management, (iii) Overall business management planning, (iv) Business development, and (v) Marketing assistance; (2... PROGRAMS SMALL BUSINESS PROGRAMS The Department of Energy Mentor-Protege Program 919.7011 Developmental...
22 CFR 518.25 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-04-01
... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 518.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the...
1991-03-01
1-2 1.4 CONCLUSIONS AND RECOMMENDATIONS ....................... 1-2 20. PHASE II MANAGEMENT PLAN...2-1 2.1 PROGRAM MANAGEMENT ................................... 2-1 2.2 IM IP TEAM...Barbier, reference Section 2.0 (Phase II Management Plan), is complete and this report provides the results of the Phase II study. 1.2 OBJECTIVES The
Waste treatability guidance program. User`s guide. Revision 0
DOE Office of Scientific and Technical Information (OSTI.GOV)
Toth, C.
1995-12-21
DOE sites across the country generate and manage radioactive, hazardous, mixed, and sanitary wastes. It is necessary for each site to find the technologies and associated capacities required to manage its waste. One role of DOE HQ Office of Environmental Restoration and Waste Management is to facilitate the integration of the site- specific plans into coherent national plans. DOE has developed a standard methodology for defining and categorizing waste streams into treatability groups based on characteristic parameters that influence waste management technology needs. This Waste Treatability Guidance Program automates the Guidance Document for the categorization of waste information into treatabilitymore » groups; this application provides a consistent implementation of the methodology across the National TRU Program. This User`s Guide provides instructions on how to use the program, including installations instructions and program operation. This document satisfies the requirements of the Software Quality Assurance Plan.« less
An alternate property tax program requiring a forest management plan and scheduled harvesting
D.F. Dennis; P.E. Sendak
1991-01-01
Vermont's Use Value Appraisal property tax program, designed to address problems such as tax inequity and forced development caused by taxing agricultural and forest land based on speculative values, requires a forest management plan and scheduled harvests. A probit analysis of enrollment provides evidence of the program's success in attracting large parcels...
Hall, Stacey A; Allen, Brandon L; Phillips, Dennis
2016-01-01
College athletic departments have a responsibility to provide a safe environment for student-athletes; however, most colleges do not have a crisis management plan that includes procedures for displaced student-athletes or alternate facilities to perform athletic events. Continuity of operations planning ensures athletic programs are equipped to maintain essential functions during, or shortly after, a disruption of operations due to possible hazards. Previous studies have identified a lack of emergency preparedness and continuity planning in college athletic departments. The purpose of this article is to illustrate in detail one approach to disaster planning for college athletic departments, namely the Federal Emergency Management Agency (FEMA) continuity of operations framework. By adhering to FEMA guidelines and promoting a best practices model, athletic programs can effectively plan to address potential hazards, as well as protect the organization's brand, image, and financial sustainability after a crisis event.
76 FR 19683 - Conservation Program Recipient Reporting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-08
... regulation that has application or plan due dates after October 1, 2010. The Watershed Operations and Flood Prevention Program, Emergency Watersheds Protection Program, Healthy Forests Reserve Program, Agricultural Management Assistance Program, and the Conservation Stewardship Program have application or plan due dates...
Code of Federal Regulations, 2010 CFR
2010-07-01
..., interstate, areawide and regional and local CWA water quality planning and management activities undertaken... Quality Management (WQM) plans developed under sections 208 and 303 of the Act. (b) Planning and... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING...
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-09-01
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
48 CFR 1819.7205 - Mentor-protégé agreements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... in— (i) General business management, including organizational management, financial management, personnel management, marketing, business development, and overall business planning; (ii) Engineering... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7205 Mentor...
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
Successful healthcare programs and projects: organization portfolio management essentials.
Pickens, Scott; Solak, Jamie
2005-01-01
Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.
Davidson, Anne; McKerrow, Alexa; Long, Don; Earnhardt, Todd
2015-01-01
The intended target audience for this document initially is management and project technical specialist and scientists involved in the Gap Analysis Program (GAP) and the Landscape Fire and Resource Management Planning Tools - (LANDFIRE) program to help communicate coordination activities to all involved parties. This document is also intended to give background information in other parts of the USGS and beyond, although some details given are relatively oriented to management of the respective programs. Because the Gap Analysis Program (GAP) and the Landscape Fire and Resource Management Planning Tools - LANDFIRE programs both rely on characterizations of land cover using similar scales and resolutions, the programs have been coordinating their work to improve scientific consistency and efficiency of production. Initial discussions and informal sharing of ideas and work began in 2008. Although this collaboration was fruitful, there was no formal process for reporting results, plans, or outstanding issues, nor was there any formally-defined coordinated management team that spanned the two programs. In 2012, leadership from the two programs agreed to strengthen the coordination of their respective work efforts. In 2013 the GAP and LANDFIRE programs developed an umbrella plan of objectives and components related to three mutual focus areas for the GAP and LANDFIRE collaboration for the years 2013 and 2014 (GAP/LANDFIRE 2013). The evolution of this partnership resulted in the drafting of an inter-program Memorandum of Understanding (MOU) in 2014. This MOU identified three coordination topics relevant to the two programs participating at this point in the MOU history: Vegetation mappingDisturbance classesFormal quality assessment
Tank waste remediation system configuration management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less
45 CFR 74.25 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan is the financial expression of...
40 CFR 30.25 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... FEDERAL ASSISTANCE UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 30.25 Revision of budget and program plans. (a) The budget plan is the financial...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silvas, A. J.
The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on themore » NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.« less
Planning and scheduling for success
NASA Technical Reports Server (NTRS)
Manzanera, Ignacio
1994-01-01
Planning and scheduling programs are excellent management tools when properly introduced to the project management team and regularly maintained. Communications, creativity, flexibility and accuracy are substantially improved by following a simple set of rules. A planning and scheduling program will work for you if you believe in it, make others in your project team realize its benefits, and make it an extension of your project cost control philosophy.
75 FR 76345 - Risk Reduction Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-08
... Management Plan Each RRPP must include a Fatigue Management Plan (FMP) that will be designed to reduce the... organizations to develop voluntary proactive safety programs designed to improve railroad safety and build... contractors. A railroad's RRPP may be required to specify how the railroad will periodically review the design...
Sandia National Laboratories California Waste Management Program Annual Report February 2008.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brynildson, Mark E.
The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.
78 FR 77550 - Integrated Corridor Management Deployment Planning Grants
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-23
... of this program is to promote the integrated management and operations of the transportation system... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Integrated Corridor Management... the Integrated Corridor Management Deployment Planning Grants. The purpose of this notice was to...
7 CFR 3565.351 - Project management.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 15 2010-01-01 2010-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...
7 CFR 3565.351 - Project management.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 15 2012-01-01 2012-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...
7 CFR 3565.351 - Project management.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...
7 CFR 3565.351 - Project management.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...
7 CFR 3565.351 - Project management.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 15 2011-01-01 2011-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...
38 CFR 49.25 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 49.25 Revision of budget and program plans. (a) The budget plan is the financial expression of...
Strategic Planning for Collegiate Athletics.
ERIC Educational Resources Information Center
Yow, Deborah A.; Migliore, R. Henry; Bowden, William W.; Stevens, Robert E.; Loudon, David L.
This book presents strategies for planning and managing athletic programs. It helps college athletic administrators analyze their organization's environment, set objectives, decide on specific actions, and obtain feedback. Chapter 1, "Perspectives on Planning for Athletics Programs," discusses what planning is and why it is important.…
48 CFR 2801.603-1 - Department of Justice Acquisition Career Management Program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Representatives, or equivalent positions. (c) The program shall include: (1) Management information system... acquisition workforce management information system. (2) Individual assessments and development plans for... Acquisition Career Management Program. 2801.603-1 Section 2801.603-1 Federal Acquisition Regulations System...
Integrating human resources and program-planning strategies.
Smith, J E
1989-06-01
The integration of human resources management (HRM) strategies with long-term program-planning strategies in hospital pharmacy departments is described. HRM is a behaviorally based, comprehensive strategy for the effective management and use of people that seeks to achieve coordination and integration with overall planning strategies and other managerial functions. It encompasses forecasting of staffing requirements; determining work-related factors that are strong "motivators" and thus contribute to employee productivity and job satisfaction; conducting a departmental personnel and skills inventory; employee career planning and development, including training and education programs; strategies for promotion and succession, including routes of advancement that provide alternatives to the managerial route; and recruitment and selection of new personnel to meet changing departmental needs. Increased competitiveness among hospitals and a shortage of pharmacists make it imperative that hospital pharmacy managers create strategies to attract, develop, and retain the right individuals to enable the department--and the hospital as a whole--to grow and change in response to the changing health-care environment in the United States. Pharmacy managers would be greatly aided in this mission by the establishment of a well-defined, national strategic plan for pharmacy programs and services that includes an analysis of what education and training are necessary for their successful accomplishment. Creation of links between overall program objectives and people-planning strategies will aid hospital pharmacy departments in maximizing the long-term effectiveness of their practice.
Savannah River Site nuclear materials management plan FY 2017-2031
DOE Office of Scientific and Technical Information (OSTI.GOV)
Magoulas, V.
The purpose of the Nuclear Materials Management Plan (herein referred to as “this Plan”) is to integrate and document the activities required to disposition the legacy and/or surplus Enriched Uranium (EU) and Plutonium (Pu) and other nuclear materials already stored or anticipated to be received by facilities at the Department of Energy (DOE) Savannah River Site (SRS) as well as the activities to support the DOE Tritium mission. It establishes a planning basis for EU and Pu processing operations in Environmental Management Operations (EMO) facilities through the end of their program missions and for the tritium through the National Nuclearmore » Security Administration (NNSA) Defense Programs (DP) facilities. Its development is a joint effort among the Department of Energy - Savannah River (DOE-SR), DOE – Environmental Management (EM), NNSA Office of Material Management and Minimization (M3), NNSA Savannah River Field Office (SRFO), and the Management and Operations (M&O) contractor, Savannah River Nuclear Solutions, LLC (SRNS). Life-cycle program planning for Nuclear Materials Stabilization and Disposition and the Tritium Enterprise may use this Plan as a basis for the development of the nuclear materials disposition scope and schedule. This Plan assumes full funding to accomplish the required project and operations activities. It is recognized that some aspects of this Plan are pre decisional with regard to National Environmental Policy Act (NEPA); in such cases new NEPA actions will be required.« less
Idaho National Laboratory Site Pollution Prevention Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
E. D. Sellers
2007-03-01
It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Managementmore » System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively managed by the INL Site P2 Coordinator. Development and maintenance of this overall INL Site plan is ultimately the responsibility of DOE-ID. This plan is applicable to all INL Site contractors except those at the Naval Reactors Facility.« less
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Scope. 436.1 Section 436.1 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS § 436.1 Scope. This part sets forth the rules for Federal energy management and planning programs to reduce Federal energy consumption and...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 3 2013-01-01 2013-01-01 false Scope. 436.1 Section 436.1 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS § 436.1 Scope. This part sets forth the rules for Federal energy management and planning programs to reduce Federal energy consumption and...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 3 2012-01-01 2012-01-01 false Scope. 436.1 Section 436.1 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS § 436.1 Scope. This part sets forth the rules for Federal energy management and planning programs to reduce Federal energy consumption and...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 3 2014-01-01 2014-01-01 false Scope. 436.1 Section 436.1 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS § 436.1 Scope. This part sets forth the rules for Federal energy management and planning programs to reduce Federal energy consumption and...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Scope. 436.1 Section 436.1 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS § 436.1 Scope. This part sets forth the rules for Federal energy management and planning programs to reduce Federal energy consumption and...
Financial Management for Transit: A Handbook.
ERIC Educational Resources Information Center
Heaselden, Mark; And Others
This handbook is primarily intended to serve as a primer for transit system managers who have not had any formal financial education through college classes, professional development programs, or extensive on-the-job programs. The following topics are covered: financial planning techniques for transit (beginning the financial planning process,…
18 CFR 740.4 - State water management planning program.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL...) Describe water and related land resources problems, needs and opportunities, and the priorities proposed...
18 CFR 740.4 - State water management planning program.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL...) Describe water and related land resources problems, needs and opportunities, and the priorities proposed...
18 CFR 740.4 - State water management planning program.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL...) Describe water and related land resources problems, needs and opportunities, and the priorities proposed...
18 CFR 740.4 - State water management planning program.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL...) Describe water and related land resources problems, needs and opportunities, and the priorities proposed...
40 CFR 60.2055 - What is a waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60.2055 Section 60.2055 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60...
41 CFR 102-192.70 - What security policies and plans must we have?
Code of Federal Regulations, 2014 CFR
2014-01-01
... and plans must we have? 102-192.70 Section 102-192.70 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS... plans must we have? (a) You must have a written mail security policy that applies throughout the agency...
41 CFR 102-192.70 - What security policies and plans must we have?
Code of Federal Regulations, 2010 CFR
2010-07-01
... and plans must we have? 102-192.70 Section 102-192.70 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS... plans must we have? (a) You must have a written mail security policy that applies throughout the agency...
41 CFR 102-192.70 - What security policies and plans must we have?
Code of Federal Regulations, 2011 CFR
2011-01-01
... and plans must we have? 102-192.70 Section 102-192.70 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS... plans must we have? (a) You must have a written mail security policy that applies throughout the agency...
41 CFR 102-192.70 - What security policies and plans must we have?
Code of Federal Regulations, 2012 CFR
2012-01-01
... and plans must we have? 102-192.70 Section 102-192.70 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS... plans must we have? (a) You must have a written mail security policy that applies throughout the agency...
7 CFR 1209.40 - Programs, plans, and projects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... requirements for quality control, grade standards, supply management programs, or other programs that would..., plan, or project, no reference to a brand name, trade name, or State or regional identification of any...
18 CFR 740.1 - Purpose and scope.
Code of Federal Regulations, 2010 CFR
2010-04-01
... authorized by the Act and those related programs of other Federal agencies; (2) Integration of water conservation with State water management planning; (3) Integration of water quantity and water quality planning; (4) Integration of ground and surface water planning; (5) Planning for protection and management of...
Evaluation readiness: improved evaluation planning using a data inventory framework.
Cohen, A B; Hall, K C; Cohodes, D R
1985-01-01
Factors intrinsic to many programs, such as ambiguously stated objectives, inadequately defined performance measures, and incomplete or unreliable databases, often conspire to limit the evaluability of these programs. Current evaluation planning approaches are somewhat constrained in their ability to overcome these obstacles and to achieve full preparedness for evaluation. In this paper, the concept of evaluation readiness is introduced as a complement to other evaluation planning approaches, most notably that of evaluability assessment. The basic products of evaluation readiness--the formal program definition and the data inventory framework--are described, along with a guide for assuring more timely and appropriate evaluation response capability to support the decision making needs of program managers. The utility of evaluation readiness for program planning, as well as for effective management, is also discussed.
Daniel Navon
1978-01-01
These 14 papers were submitted to a conference of Project Group P4.07 Division IV, International Union of Forestry Research Organizations. Topics discussed included the uses of simulations, analytical techniques, and mathematical programming techniques in land management planning, reforestation programs, intensive forestry, timber management and production, tree growth...
15 CFR 14.25 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...
22 CFR 145.25 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Section 145.25 Foreign Relations DEPARTMENT OF STATE CIVIL RIGHTS GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 145.25 Revision of budget and program plans. (a) The budget plan is the...
FIREFAMILY: Fire planning with historic weather data.
William A. Main; Robert J. Straub; Donna M. Paananen
1982-01-01
This user's guide will help fire managers interpret the output from FIREFAMILY, a computer program that uses historic weather data for fire planning. The guide describes options within the program and explains various tables and graphs necessary for planning. It also provides details which computer specialists need to run the program.
2015-10-28
The U.S. Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) Program regulations regarding enrollment options following the termination of a plan or plan option.
Blazing the trailway: Nuclear electric propulsion and its technology program plans
NASA Technical Reports Server (NTRS)
Doherty, Michael P.
1992-01-01
An overview is given of the plans for a program in nuclear electric propulsion (NEP) technology for space applications being considered by NASA, DOE, and DOD. Possible missions using NEP are examined, and NEP technology plans are addressed regarding concept development, systems engineering, nuclear fuels, power conversion, thermal management, power management and distribution, electric thrusters, facilities, and issues related to safety and environment. The programmatic characteristics are considered.
Major Management Challenges and Program Risks. Department of Education
2001-01-01
GAO United States General Accounting Office Performance and Accountability SeriesJanuary 2001 Major Management Challenges and Program Risks ...34) Title and Subtitle Major Management Challenges and Program Risks Department of Education Contract or Grant Number Program Element Number Authors...Accountability Series: Major Management Challenges and Program Risks . In that series, GAO advised the Congress that it planned to reassess the
Rocky Mountain Research Station USDA Forest Service
2004-01-01
In the course of work as a land manager, you will no doubt be involved in developing programs to achieve various objectives, including the improvement of fuels management on private lands. This fact sheet describes six steps that will help you plan and conduct a successful program.
1989-07-01
incorporated into the sys- Kotler88 tem. Several interesting concepts are presented, but Kotler , P. Marketing Planning: Analysis, Planning, the bulk of the...Metzger87 Mantei, M. "The Effect of Programming Team Metzger, Philip W. Managing Programming Structures on Programming Tasks." Comm. ACM People: A Personal... Philips . Software Engi- Classic approach in organization theory. neering. Englewood Cliffs, N.J.: Prentice-Hall, 1988. Shannon75 An industrial approach
Corrosion Prevention and Control Planning Guidebook Spiral 3
2007-09-01
programs. 5. Develop and recommend corrective and preventive procedures based on reliability and maintainability analyses of field data on similar in...One of the many challenges facing the Program/Acquisition Managers is the ability to develop a meaningful Corrosion Prevention and Control Plan...designated program manager of all activities associated with the acquisition, development , production, fielding , sustainment, and disposal of a DoD weapon
Reducing environmental noise impacts: A USAREUR noise management program handbook
NASA Astrophysics Data System (ADS)
Feather, Timothy D.; Shekell, Ted K.
1991-06-01
Noise pollution is a major environmental problem faced by the U.S. Army in Europe. Noise-related complaints from German citizens can escalate into intense political issues in German communities. This in turn hampers efficient operation of military training and often times threatens the Army's mission. In order to remedy these problems, USAREUR has developed a noise management program. A successful noise management program will limit the impact of unavoidable noise on the populace. This report, a component of the noise management program, is a reference document for noise management planning. It contains guidelines and rules-of-thumb for noise management. This document contains procedures which operation and training level personnel can understand and apply in their day to day noise management planning. Noise mitigation tips are given. Basic technical information that will aid in understanding noise mitigation is provided along with noise management through land use planning. Noise management for specific components of the military community, (airfields, base operations, training areas, and housing and recreation areas) are addressed. The nature of noise generated, means of noise abatement at the source, path, and receiver (both physical and organizational/public relations methods), and a case study example are described.
Guidelines for developing transportation management plans in Virginia.
DOT National Transportation Integrated Search
2005-01-01
A transportation management plan (TMP) is a comprehensive program of traffic control, communication, operation, and demand management strategies designed to maintain acceptable levels of traffic flow in work zones. A systematic procedure and/or check...
FY 95 engineering work plan for the design reconstitution implementation action plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bigbee, J.D.
Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less
An Economic History of Medicare Part C
Mcguire, Thomas G; Newhouse, Joseph P; Sinaiko, Anna D
2011-01-01
Context: Twenty-five years ago, private insurance plans were introduced into the Medicare program with the stated dual aims of (1) giving beneficiaries a choice of health insurance plans beyond the fee-for-service Medicare program and (2) transferring to the Medicare program the efficiencies and cost savings achieved by managed care in the private sector. Methods: In this article we review the economic history of Medicare Part C, known today as Medicare Advantage, focusing on the impact of major changes in the program's structure and of plan payment methods on trends in the availability of private plans, plan enrollment, and Medicare spending. Additionally, we compare the experience of Medicare Advantage and of employer-sponsored health insurance with managed care over the same time period. Findings: Beneficiaries' access to private plans has been inconsistent over the program's history, with higher plan payments resulting in greater choice and enrollment and vice versa. But Medicare Advantage generally has cost more than the traditional Medicare program, an overpayment that has increased in recent years. Conclusions: Major changes in Medicare Advantage's payment rules are needed in order to simultaneously encourage the participation of private plans, the provision of high-quality care, and to save Medicare money. PMID:21676024
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vargo, G.F. Jr.
1994-10-11
The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vugrin, K.W.; Twitchell, Ch.A.
2008-07-01
Korea Hydro and Nuclear Power Co., Ltd. (KHNP) is an electric company in the Republic of Korea with twenty operational nuclear power plants and eight additional units that are either planned or currently under construction. Regulations require that KHNP manage the radioactive waste generated by their nuclear power plants. In the course of planning low, intermediate, and high level waste storage facilities, KHNP sought interaction with an acknowledged expert in the field of radioactive waste management and, consequently, contacted Sandia National Laboratories (SNL). KHNP has contracted with SNL to provide a year long training program on repository science. This papermore » discusses the design of the curriculum, specific plans for execution of the training program, and recommendations for smooth implementation of international training programs. (authors)« less
NASA Technical Reports Server (NTRS)
Raftery, Michael; Carter-Journet, Katrina
2013-01-01
The International Space Station (ISS) risk management methodology is an example of a mature and sustainable process. Risk management is a systematic approach used to proactively identify, analyze, plan, track, control, communicate, and document risks to help management make risk-informed decisions that increase the likelihood of achieving program objectives. The ISS has been operating in space for over 14 years and permanently crewed for over 12 years. It is the longest surviving habitable vehicle in low Earth orbit history. Without a mature and proven risk management plan, it would be increasingly difficult to achieve mission success throughout the life of the ISS Program. A successful risk management process must be able to adapt to a dynamic program. As ISS program-level decision processes have evolved, so too has the ISS risk management process continued to innovate, improve, and adapt. Constant adaptation of risk management tools and an ever-improving process is essential to the continued success of the ISS Program. Above all, sustained support from program management is vital to risk management continued effectiveness. Risk management is valued and stressed as an important process by the ISS Program.
40 CFR 52.1395 - Smoke management plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Smoke management plan. 52.1395 Section 52.1395 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Department considers smoke management techniques for agriculture and forestry management burning purposes as...
40 CFR 52.1395 - Smoke management plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Smoke management plan. 52.1395 Section 52.1395 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Department considers smoke management techniques for agriculture and forestry management burning purposes as...
Formulating New Directions with Strategic Marketing Planning.
ERIC Educational Resources Information Center
Crompton, John L.
1983-01-01
This article describes both a short- and long-term strategic marketing planning approach for the parks and recreation manager. Both plans involve a needs assessment, objective development, marketing plans, and evaluations. Also discussed is a continuum of stragetic program options ranging from developing new programs to terminating existing…
33 CFR 385.31 - Adaptive management program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Adaptive management program. 385... Incorporating New Information Into the Plan § 385.31 Adaptive management program. (a) General. The Corps of Engineers and the South Florida Water Management District shall, in consultation with the Department of the...
40 CFR 68.175 - Prevention program/Program 3.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.175 Prevention program/Program... the most recent change that triggered management of change procedures and the date of the most recent review or revision of management of change procedures. (j) The date of the most recent pre-startup review...
Disease management: a leap of faith to lower-cost, higher-quality health care.
Short, Ashley; Mays, Glen; Mittler, Jessica
2003-10-01
With managed care's promise to reduce costs and improve quality waning, employers and health plans are exploring more targeted ways to control rapidly rising health costs. Disease management programs, which focus on patients with chronic conditions such as asthma and diabetes, are growing in popularity, according to findings from the Center for Studying Health System Change's (HSC) 2002-03 site visits to 12 nationally representative communities. In addition to condition-based disease management programs, some health plans and employers are using intensive case management services to coordinate care for high-risk patients with potentially costly and complex medical conditions. Despite high expectations, evidence of both disease management and case management programs' success in controlling costs and improving quality remains limited.
Implementing program-wide awareness about recovery in a large mental health and addictions program.
McVanel-Viney, Sarah; Younger, Jodi; Doyle, Winnie; Kirkpatrick, Helen
2006-01-01
St. Joseph's Healthcare Hamilton conceptualized a multi-step plan for implementing a recovery oriented service delivery approach within their Mental Health and Addictions Program. This brief report discusses the first phase of this plan which included building awareness of recovery utilizing Anthony's (2000) system standards to develop a needs assessment for managers and senior team members. The survey had three purposes: to increase managers' awareness about recovery; to allow managers to express concerns that they had with this paradigm; and to afford managers an opportunity to explore the ways in which their service was and was not operating in a recovery oriented way. Initiatives designed to build awareness throughout the program are discussed.
Hanford Site Groundwater Protection Management Program: Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Groundwater protection is a national priority that is promulgated in a variety of environmental regulations at local, state, and federal levels. To effectively coordinate and ensure compliance with applicable regulations, the US Department of Energy has issued DOE Order 5400.1 (now under revision) that requires all US Department of Energy facilities to prepare separate groundwater protection program descriptions and plans. This document describes the Groundwater Protection Management Program for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the Groundwater Protection Management Program cover the following general topical areas: (1) documentation of the groundwater regime,more » (2) design and implementation of a groundwater monitoring program to support resource management and comply with applicable laws and regulations, (3) a management program for groundwater protection and remediation, (4) a summary and identification of areas that may be contaminated with hazardous waste, (5) strategies for controlling these sources, (6) a remedial action program, and (7) decontamination and decommissioning and related remedial action requirements. Many of the above elements are covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing groundwater protection activities. Additionally, it describes how information needs are identified and can be incorporated into existing or proposed new programs. The Groundwater Protection Management Program provides the general scope, philosophy, and strategies for groundwater protection/management at the Hanford Site. Subtier documents provide the detailed plans for implementing groundwater-related activities and programs. Related schedule and budget information are provided in the 5-year plan for environmental restoration and waste management at the Hanford Site.« less
Code of Federal Regulations, 2010 CFR
2010-01-01
... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT NATIONAL MARINE SANCTUARY PROGRAM REGULATIONS Management Plan Development and Implementation § 922.30 General. (a) The Secretary shall implement each management plan, and applicable regulations, including carrying out...
The United Kingdom's School Asset Management Plans.
ERIC Educational Resources Information Center
Jones, Alan
1999-01-01
Examines the U.K.'s Asset Management Plans (AMPs) designed to help Local Education Authorities (LEAs) identify and address the most important priorities in their school capital programs, and to help in their longer term planning and management of the school estate. Discusses AMP objectives, the stages of developing an AMP, and how the Department…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-29
... Resource Management Plans for Puget Sound Hatchery Programs and Reopening of Comment Period AGENCY... prepare an Environmental Impact Statement (EIS) for two hatchery Resource Management Plans and appended Hatchery and Genetic Management Plans (HGMPs) jointly proposed by the Washington Department of Fish and...
40 CFR 63.95 - Additional approval criteria for accidental release prevention programs.
Code of Federal Regulations, 2011 CFR
2011-07-01
... basis. (3) Procedures for reviewing risk management plans and providing technical assistance to... chapter; and (ii) A requirement that any source subject to the State's part 68 program submit a Risk Management Plan (RMP) that reports at least the same information in the same format as required under part 68...
40 CFR 63.95 - Additional approval criteria for accidental release prevention programs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... basis. (3) Procedures for reviewing risk management plans and providing technical assistance to... chapter; and (ii) A requirement that any source subject to the State's part 68 program submit a Risk Management Plan (RMP) that reports at least the same information in the same format as required under part 68...
45 CFR 1304.51 - Management systems and procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... program planning that includes consultation with the program's governing body, policy groups, and program... SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD...-income families with young children. Program planning must include: (i) An assessment of community...
Fitzner, Karen; Fox, Kathe; Schmidt, Joseph; Roberts, Mark; Rindress, Donna; Hay, Joel
2005-08-01
Despite widespread adoption of disease management (DM) programs by US health plans, gaps remain in the evidence for their benefit. The Disease Management Outcomes Consolidation Survey was designed to gather data on DM programs for commercial health plans, to assess program success and DM effectiveness. The questionnaire was mailed to 292 appropriate health plan contacts; 26 plans covering more than 14 million commercial members completed and returned the survey. Respondents reported that DM plays a significant and increasing role in their organizations. Key reasons for adopting DM were improving clinical outcomes, reducing medical costs and utilization, and improving member satisfaction. More respondents were highly satisfied with clinical results than with utilization or cost outcomes of their programs (46%, 17%, and 13%, respectively). Detailed results were analyzed for 57 DM programs with over 230,000 enrollees. Most responding plans offered DM programs for diabetes and asthma, with return on investment (ROI) ranging from 0.16:1 to 4:1. Weighted by number of enrollees per DM program, average ROI was 2.56:1 for asthma (n = 1,136 enrollees) and 1.98:1 for diabetes (n = 25,364). Most (but not all) respondents reported reduced hospital admissions, increasing rates of preventive care, and improved clinical measures. Few respondents provided detailed information about DM programs for other medical conditions, but most that did reported positive outcomes. Lack of standardized methodology was identified as a major barrier to in-house program evaluation. Although low response rate precluded drawing many general conclusions, a clear need emerged for more rigorous evaluation methods and greater standardization of outcomes measurement.
Health Promotion Interventions for Low-Income Californians Through Medi-Cal Managed Care Plans, 2012
Kohatsu, Neal D.; Paciotti, Brian M.; Byrne, Jennifer V.; Kizer, Kenneth W.
2015-01-01
Introduction Prevention is the most cost-effective approach to promote population health, yet little is known about the delivery of health promotion interventions in the nation’s largest Medicaid program, Medi-Cal. The purpose of this study was to inventory health promotion interventions delivered through Medi-Cal Managed Care Plans; identify attributes of the interventions that plans judged to have the greatest impact on their members; and determine the extent to which the plans refer members to community assistance programs and sponsor health-promoting community activities. Methods The lead health educator from each managed care plan was asked to complete a 190-item online survey in January 2013; 20 of 21 managed care plans responded. Survey data on the health promotion interventions with the greatest impact were grouped according to intervention attributes and measures of effectiveness; quantitative data were analyzed using descriptive statistics. Results Health promotion interventions judged to have the greatest impact on Medi-Cal members were delivered in various ways; educational materials, one-on-one education, and group classes were delivered most frequently. Behavior change, knowledge gain, and improved disease management were cited most often as measures of effectiveness. Across all interventions, median educational hours were limited (2.4 h), and median Medi-Cal member participation was low (265 members per intervention). Most interventions with greatest impact (120 of 137 [88%]) focused on tertiary prevention. There were mixed results in referring members to community assistance programs and investing in community activities. Conclusion Managed care plans have many opportunities to more effectively deliver health promotion interventions. Establishing measurable, evidence-based, consensus standards for such programs could facilitate improved delivery of these services. PMID:26564012
National Civil Applications Program: strategic plan vision for 2005
,
2004-01-01
The National Mapping Division (NMD) has developed this comprehensive strategic plan to chart the course of the National Civil Applications Program (NCAP) over the next 5 years. To meet the challenges of the future, the NCAP is changing its program emphases, methods of responding to customer needs, and business practices. The NCAP Strategic Plan identifies the new direction for the program through a series of strategic thrusts and goals for managers to use in formulating plans, establishing program emphases, and determining resource needs and allocations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants (section 205(j)(2)) § 35.412... State's construction grant allotment as determined by Congress for Water Quality Management Planning...
2016-11-01
personnel, career paths for program managers, plans to strengthen program management, and use of special hiring authorities) Monitor and report...agencies with direct hiring authority for program managers and directed OPM to create a specialized career path. OMB also tasked agencies with...guidance for developing career paths for IT program managers.14 OPM’s career path guide was to build upon its IT Program Management Competency Model
High resolution microwave spectrometer sounder (HIMSS), volume 1, book 2
NASA Technical Reports Server (NTRS)
1990-01-01
The following topics are presented with respect to the high resolution microwave spectrometer sounder (HIMSS) that is to be used as an instrument for NASA's Earth Observing System (EOS): (1) preliminary program plans; (2) contract end item (CEI) specification; and (3) the instrument interface description document. Under the preliminary program plans section, plans dealing with the following subject areas are discussed: spares, performance assurance, configuration management, software implementation, contamination, calibration management, and verification.
Efficacy of a Transition Theory-Based Discharge Planning Program for Childhood Asthma Management.
Ekim, Ayfer; Ocakci, Ayse Ferda
2016-02-01
This study tested the efficacy of a nurse-led discharge planning program for childhood asthma management, based on transition theory. A quasi-experimental design was used. The sample comprised 120 children with asthma and their parents (intervention group n = 60, control group n = 60). The asthma management self-efficacy perception level of parents in the intervention group increased significantly and the number of triggers their children were exposed to at home was reduced by 60.8%. The rates of admission to emergency departments and unscheduled outpatient visits were significantly lower in the intervention group compared with the control group. Transition theory-based nursing interventions can provide successful outcomes on childhood asthma management. Transition theory-based discharge planning program can guide nursing interventions to standardize care of the child with asthma. Combining care at home with hospital care strengthens ongoing qualified asthma management. © 2015 NANDA International, Inc.
40 CFR 68.180 - Emergency response program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...
40 CFR 68.180 - Emergency response program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...
40 CFR 68.180 - Emergency response program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...
40 CFR 68.180 - Emergency response program.
Code of Federal Regulations, 2014 CFR
2014-07-01
... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...
Tank waste remediation system tank waste retrieval risk management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Klimper, S.C.
1997-11-07
This Risk Management Plan defines the approach to be taken to manage programmatic risks in the TWRS Tank Waste Retrieval program. It provides specific instructions applicable to TWR, and is used to supplement the guidance given by the TWRS Risk Management procedure.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Fivemore » priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs.« less
2014-06-01
21 C . CMMS USE IN THE LCS PROGRAM ......................................................22 D. CBM+ MAINTENANCE MANAGEMENT SYSTEM...45 b. Plan Maintenance Budgeting .................................................45 c . Plan Maintenance Logistics... Maintenance Planning ...................................46 b. Communicate Maintenance Budget .......................................46 c . Communicate
DOT National Transportation Integrated Search
2012-11-01
The Connected Vehicle Mobility Standards Coordination Plan project links activities in three programs (Data Capture and Management, Dynamic Mobility Applications, and ITS Standards). The plan coordinates the timing, intent and relationship of activit...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Woods, T.W.
1991-09-01
This report is volume 3, part B, of the program to satisfy the allocated requirements of the Office of Civilian Radioactive Waste Management Program, in the development of the nuclear waste management system. The report is divided into the following sections: regulatory compliance; external relations; international programs; strategic and contingency planning; contract business management; and administrative services. (CS)
The Con Edison Emergency Child Care Plan for Management Employees: Summary Plan Description.
ERIC Educational Resources Information Center
Consolidated Edison Co., Brooklyn, NY.
This summary plan description offers guidelines for participation in a pilot program that provides short-term emergency care for children of Con Edison managers who are under 13 years old. The plan offers professional, in-home child care that can be used when usual arrangements have collapsed. The summary plan description addresses the following…
ERIC Educational Resources Information Center
National Alliance of Business, Inc., Washington, DC.
This guide offers a practical approach for operating summer youth employment programs that involves cooperation among private businesses and local organizations. A timetable provides a month-by-month schedule. Seven sections discuss management responsibilities. Program Planning covers scope, goals, and coordination. Program Management addresses…
DOT National Transportation Integrated Search
2007-02-14
This final rule revises the regulations governing the development of metropolitan transportation plans and programs for urbanized areas, State transportation plans and programs and the regulations for Congestion Management Systems. The revision resul...
7 CFR 634.1 - Purpose and scope.
Code of Federal Regulations, 2011 CFR
2011-01-01
... best management practices (BMP's) in project areas which have critical water quality problems resulting... approved agricultural portion of a 208 water quality management plan. Participation in RCWP is voluntary. (c) The program is a new USDA program and an extension of existing water-quality management programs...
7 CFR 634.1 - Purpose and scope.
Code of Federal Regulations, 2010 CFR
2010-01-01
... best management practices (BMP's) in project areas which have critical water quality problems resulting... approved agricultural portion of a 208 water quality management plan. Participation in RCWP is voluntary. (c) The program is a new USDA program and an extension of existing water-quality management programs...
NASA Information Resources Management Long Range Plan, FY 1994-1998
NASA Technical Reports Server (NTRS)
1993-01-01
Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Program Specific IRM Activities by Program Office; Major IRM Program Accomplishments for FY 1992; Information Collection Budget; Summary of Computer Security Plans; and Appendix: Acronym List.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-25
... Activities; Submission to OMB for Review and Approval; Comment Request; Risk Management Program Requirements... information about the electronic docket, go to www.regulations.gov . Title: Risk Management Program... process develop and implement a risk management program and submit a risk management plan to EPA. The...
Interviewing Key Informants: Strategic Planning for a Global Public Health Management Program
ERIC Educational Resources Information Center
Kun, Karen E.; Kassim, Anisa; Howze, Elizabeth; MacDonald, Goldie
2013-01-01
The Centers for Disease Control and Prevention's Sustainable Management Development Program (SMDP) partners with low- and middle-resource countries to develop management capacity so that effective global public health programs can be implemented and better health outcomes can be achieved. The program's impact however, was variable. Hence, there…
Association Between Health Plan Exit From Medicaid Managed Care and Quality of Care, 2006-2014
Schpero, William L.; Schlesinger, Mark J.; Trivedi, Amal N.
2017-01-01
Importance State Medicaid programs have increasingly contracted with insurers to provide medical care services for enrollees (Medicaid managed care plans). Insurers that provide these plans can exit Medicaid programs each year, with unclear effects on quality of care and health care experiences. Objective To determine the frequency and interstate variation of health plan exit from Medicaid managed care and evaluate the relationship between health plan exit and market-level quality. Design, Setting, and Participants Retrospective cohort of all comprehensive Medicaid managed care plans (N = 390) during the interval 2006-2014. Exposures Plan exit, defined as the withdrawal of a managed care plan from a state’s Medicaid program. Main Outcomes and Measures Eight measures from the Healthcare Effectiveness Data and Information Set were used to construct 3 composite indicators of quality (preventive care, chronic disease care management, and maternity care). Four measures from the Consumer Assessment of Healthcare Providers and Systems were combined into a composite indicator of patient experience, reflecting the proportion of beneficiaries rating experiences as 8 or above on a 0-to-10–point scale. Outcome data were available for 248 plans (68% of plans operating prior to 2014, representing 78% of beneficiaries). Results Of the 366 comprehensive Medicaid managed care plans operating prior to 2014, 106 exited Medicaid. These exiting plans enrolled 4 848 310 Medicaid beneficiaries, with a mean of 606 039 beneficiaries affected by plan exits annually. Six states had a mean of greater than 10% of Medicaid managed care recipients enrolled in plans that exited, whereas 10 states experienced no plan exits. Plans that exited from a state’s Medicaid market performed significantly worse prior to exiting than those that remained in terms of preventive care (57.5% vs 60.4%; difference, 2.9% [95% CI, 0.3% to 5.5%]), maternity care (69.7% vs 73.6%; difference, 3.8% [95% CI, 1.7% to 6.0%]), and patient experience (73.5% vs 74.8%; difference, 1.3% [95% CI, 0.6% to 1.9%]). There was no significant difference between exiting and nonexiting plans for the quality of chronic disease care management (76.2% vs 77.1%; difference, 1.0% [95% CI, −2.1% to 4.0%]). There was also no significant change in overall market performance before and after the exit of a plan: 0.7–percentage point improvement in preventive care quality (95% CI, −4.9 to 6.3); 0.2–percentage point improvement in chronic disease care management quality (95% CI, −5.8 to 6.2); 0.7–percentage point decrease in maternity care quality (95% CI, −6.4 to 5.0]); and a 0.6–percentage point improvement in patient experience ratings (95% CI, −3.9 to 5.1). Medicaid beneficiaries enrolled in exiting plans had access to coverage for a higher-quality plan, with 78% of plans in the same county having higher quality for preventive care, 71.1% for chronic disease management, 65.5% for maternity care, and 80.8% for patient experience. Conclusions and Relevance Between 2006 and 2014, health plan exit from the US Medicaid program was frequent. Plans that exited generally had lower quality ratings than those that remained, and the exits were not associated with significant overall changes in quality or patient experience in the plans in the Medicaid market. PMID:28655014
Association Between Health Plan Exit From Medicaid Managed Care and Quality of Care, 2006-2014.
Ndumele, Chima D; Schpero, William L; Schlesinger, Mark J; Trivedi, Amal N
2017-06-27
State Medicaid programs have increasingly contracted with insurers to provide medical care services for enrollees (Medicaid managed care plans). Insurers that provide these plans can exit Medicaid programs each year, with unclear effects on quality of care and health care experiences. To determine the frequency and interstate variation of health plan exit from Medicaid managed care and evaluate the relationship between health plan exit and market-level quality. Retrospective cohort of all comprehensive Medicaid managed care plans (N = 390) during the interval 2006-2014. Plan exit, defined as the withdrawal of a managed care plan from a state's Medicaid program. Eight measures from the Healthcare Effectiveness Data and Information Set were used to construct 3 composite indicators of quality (preventive care, chronic disease care management, and maternity care). Four measures from the Consumer Assessment of Healthcare Providers and Systems were combined into a composite indicator of patient experience, reflecting the proportion of beneficiaries rating experiences as 8 or above on a 0-to-10-point scale. Outcome data were available for 248 plans (68% of plans operating prior to 2014, representing 78% of beneficiaries). Of the 366 comprehensive Medicaid managed care plans operating prior to 2014, 106 exited Medicaid. These exiting plans enrolled 4 848 310 Medicaid beneficiaries, with a mean of 606 039 beneficiaries affected by plan exits annually. Six states had a mean of greater than 10% of Medicaid managed care recipients enrolled in plans that exited, whereas 10 states experienced no plan exits. Plans that exited from a state's Medicaid market performed significantly worse prior to exiting than those that remained in terms of preventive care (57.5% vs 60.4%; difference, 2.9% [95% CI, 0.3% to 5.5%]), maternity care (69.7% vs 73.6%; difference, 3.8% [95% CI, 1.7% to 6.0%]), and patient experience (73.5% vs 74.8%; difference, 1.3% [95% CI, 0.6% to 1.9%]). There was no significant difference between exiting and nonexiting plans for the quality of chronic disease care management (76.2% vs 77.1%; difference, 1.0% [95% CI, -2.1% to 4.0%]). There was also no significant change in overall market performance before and after the exit of a plan: 0.7-percentage point improvement in preventive care quality (95% CI, -4.9 to 6.3); 0.2-percentage point improvement in chronic disease care management quality (95% CI, -5.8 to 6.2); 0.7-percentage point decrease in maternity care quality (95% CI, -6.4 to 5.0]); and a 0.6-percentage point improvement in patient experience ratings (95% CI, -3.9 to 5.1). Medicaid beneficiaries enrolled in exiting plans had access to coverage for a higher-quality plan, with 78% of plans in the same county having higher quality for preventive care, 71.1% for chronic disease management, 65.5% for maternity care, and 80.8% for patient experience. Between 2006 and 2014, health plan exit from the US Medicaid program was frequent. Plans that exited generally had lower quality ratings than those that remained, and the exits were not associated with significant overall changes in quality or patient experience in the plans in the Medicaid market.
Connected Vehicle Pilot Deployment Program Phase 2, Data Management Plan
DOT National Transportation Integrated Search
2017-10-17
This document represents a data management plan that delineates all of the data types and data treatment throughout the New York City Connected Vehicle Pilot Deployment (NYC CVPD). This plan includes an identification of the New York City connected v...
NASA Astrophysics Data System (ADS)
Kouziokas, Georgios N.
2016-09-01
It is generally agreed that the governmental authorities should actively encourage the development of an efficient framework of information and communication technology initiatives so as to advance and promote sustainable development and planning strategies. This paper presents a prototype Information System for public administration which was designed to facilitate public management and decision making for sustainable development and planning. The system was developed by using several programming languages and programming tools and also a Database Management System (DBMS) for storing and managing urban data of many kinds. Furthermore, geographic information systems were incorporated into the system in order to make possible to the authorities to deal with issues of spatial nature such as spatial planning. The developed system provides a technology based management of geospatial information, environmental and crime data of urban environment aiming at improving public decision making and also at contributing to a more efficient sustainable development and planning.
Using principles from emergency management to improve emergency response plans for research animals.
Vogelweid, Catherine M
2013-10-01
Animal research regulatory agencies have issued updated requirements for emergency response planning by regulated research institutions. A thorough emergency response plan is an essential component of an institution's animal care and use program, but developing an effective plan can be a daunting task. The author provides basic information drawn from the field of emergency management about best practices for developing emergency response plans. Planners should use the basic principles of emergency management to develop a common-sense approach to managing emergencies in their facilities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schwager, K.
The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.
Hazardous waste management at the local level; The Anchorage, Alaska experience
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wigglesworth, D.
1989-07-01
The need to manage hazardous wastes in the municipality of Anchorage, Alaska, has become increasingly evident in recent years. A task force, representing a broad cross-section of the community, was appointed by the mayor to develop a waste management plan that would address community concerns. Between 1984 and 1986, the Anchorage Hazardous Waste Task Force, supported by municipal staff, local consultants and volunteers from the community developed a plan emphasizing local responsibility and pollution prevention, using management capabilities and technical assistance. This paper describes the development of a non-regulatory hazardous waste management program in Anchorage, Alaska. Plan elements, program fundingmore » and the key role of the local Hazardous Waste Task Force are discussed.« less
Bill Williams; Tracey S. Frescino; Larry T. DeBlander; Sharon W. Woudenberg; Michael Wilson
2006-01-01
The Bureau of Land Management (BLM) does not have a consistent internal program or source of vegetation data to use for strategic level planning, such as in resource management plans. This technical note discusses and evaluates the potential of the USDA Forest Service Forest Inventory and Analysis (FIA) Program to assist the BLM in filling this data gap. The FIA...
Adams, Vanessa M.; Pressey, Robert L.; Stoeckl, Natalie
2014-01-01
The need to integrate social and economic factors into conservation planning has become a focus of academic discussions and has important practical implications for the implementation of conservation areas, both private and public. We conducted a survey in the Daly Catchment, Northern Territory, to inform the design and implementation of a stewardship payment program. We used a choice model to estimate the likely level of participation in two legal arrangements - conservation covenants and management agreements - based on payment level and proportion of properties required to be managed. We then spatially predicted landholders’ probability of participating at the resolution of individual properties and incorporated these predictions into conservation planning software to examine the potential for the stewardship program to meet conservation objectives. We found that the properties that were least costly, per unit area, to manage were also the least likely to participate. This highlights a tension between planning for a cost-effective program and planning for a program that targets properties with the highest probability of participation. PMID:24892520
Why some family planning program fail.
1976-04-01
40 experts representing Nepal, Malaysia, Thailand, Singapore, Korea, and the Philippines participated in a 3-day workshop in Manila in March 1976 for the purpose of discussing and proposing ways of dealing with the financial problems confronting the population programs of the individual countries. The Inter-Governmental Coordinating Committee for Southeast Asia Family/Population Planning sponsored the workshop. The recommendations made at the meeting were: 1) standardization of financing reporting procedures by the region's country programs on family planning; 2) closer coordination between donor agencies and policy-making bodies of country programs in the disbursement of funds; 3) frequent exchanges of experiences, ideas, technicaL knowledge, and other matters pertaining to the financial management of such programs; and 4) inclusion of applicable financial management topics in the training of clinical staffs and those involved in follow-up operations. Additionally, a proposal was made that national population organizations or committees develop research and evaluation units. Workshop discussion sessions focused on financial planning and management, accounting and disbursement of funds, use and control of foreign aid, cost of effectiveness and benefit analysis, and financial reporting.
DOT National Transportation Integrated Search
2015-12-01
The Florida Department of Transportation (FDOT) has initiated business plans to promote the Transportation : Systems Management and Operations (TSM&O) program throughout the State. TSM&O is traditionally managed : by traffic engineers that focus on o...
3 Steps to Developing a Tribal Integrated Waste Management Plan (IWMP)
An Integrated Waste Management Plan (IWMP) is the blueprint of a comprehensive waste management program. The steps to developing an IWMP are collect background data, map out the tribal IWMP framework, and write and implement the tribal IWMP.
Implementing Earned Value Management in the CxP EVA Systems Project Office
NASA Technical Reports Server (NTRS)
Sorge, Les L.
2009-01-01
Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.
Repository-Based Software Engineering Program: Working Program Management Plan
NASA Technical Reports Server (NTRS)
1993-01-01
Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.
Service-Based Learning for Residents: A Success for Communities and Medical Education.
Gefter, Liana; Merrell, Sylvia Bereknyei; Rosas, Lisa G; Morioka-Douglas, Nancy; Rodriguez, Eunice
2015-01-01
Community-based service-learning opportunities could support residents' acquisition of Accreditation Council for Graduate Medical Education (ACGME) competencies, but this concept has not been tested, and such programs are difficult to find. The objective of this work was to assess the value and the ACGME competency relevance of a service-learning program for residents that could be easily replicated nationally. Forty-one family medicine residents from three training programs participated in the Stanford Youth Diabetes Coaches Program at six high schools in California and Georgia serving minority students of low socioeconomic status. Residents completed online surveys to provide qualitative feedback and assess the program's impact on their acquisition of residency program competencies and self-management support proficiencies, including prior use and planned use of action plans-a key self-management support strategy. Ninety-five percent of residents indicated that the program was a valuable experience that contributed to acquisition of residency program competencies, including interpersonal and communication skills and communication with teens. Compared with baseline, significantly more residents reported intention to use action plans with patients following participation. Themes from qualitative feedback included: valuing the overall experience, increasing opportunities to practice teaching, enhancing their ability to communicate with adolescents, contributing to the health of the community, recognizing the potential of action plans, and increasing intent to use action plans. This pilot demonstrated that a brief service-learning program can enhance standard residency curriculum by encouraging acquisition of ACGME competencies and promoting utilization of self-management support in clinical practice.
Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration
NASA Technical Reports Server (NTRS)
Greene, William D.
2013-01-01
System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.
AFO Manure Management - Oregon: Plan Review and Public Notice of Substantial Changes
Compendium of State Approaches for Manure Management, Part A -- Example of program features for manure management that have a regulatory basis, such as permit provisions and other regulatory program elements.
Facilities Management: A Program for the 1980s.
ERIC Educational Resources Information Center
Kaiser, Harvey H.
1980-01-01
Successful facilities management is described as based on a 10-point comprehensive program including: (1) physical planning policy; (2) facilities analysis; (3) management audit; (4) space utilization; (5) capital programs; (6) deferred maintenance; (7) controlled maintenance; (8) energy conservation; (9) environmental quality, health, and safety;…
41 CFR 101-26.506 - Interior planning and design services.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Interior planning and...
Geriatric hip fracture management: keys to providing a successful program.
Basu, N; Natour, M; Mounasamy, V; Kates, S L
2016-10-01
Hip fractures are a common event in older adults and are associated with significant morbidity, mortality and costs. This review examines the necessary elements required to implement a successful geriatric fracture program and identifies some of the barriers faced when implementing a successful program. The Geriatric Fracture Center (GFC) is a treatment model that standardizes the approach to the geriatric fracture patient. It is based on five principles: surgical fracture management; early operative intervention; medical co-management with geriatricians; patient-centered, standard order sets to employ best practices; and early discharge planning with a focus on early functional rehabilitation. Implementing a geriatric fracture program begins with an assessment of the hospital's data on hip fractures and standard care metrics such as length of stay, complications, time to surgery, readmission rates and costs. Business planning is essential along with the medical planning process. To successfully develop and implement such a program, strong physician leadership is necessary to articulate both a short- and long-term plan for implementation. Good communication is essential-those organizing a geriatric fracture program must be able to implement standardized plans of care working with all members of the healthcare team and must also be able to foster relationships both within the hospital and with other institutions in the community. Finally, a program of continual quality improvement must be undertaken to ensure that performance outcomes are improving patient care.
ERIC Educational Resources Information Center
State Univ. of New York, Buffalo. Western New York School Study Council.
Although the public is best served by governmental agencies which have integrated the major functions of planning, managing, and budgeting, it can be asserted that the planning function is paramount. A review of the evolution of public agency administration in the U.S. reveals that until recent years the planning function has been largely…
Natural and accelerated bioremediation research program plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE`s Office of Environmental Management (EM). The program builds on OHER`s tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER`s and Office of Energy Research`s (OER`s) commitment to supporting DOE`s environmental management mission and the belief that bioremediation is an important part of themore » solution to DOE`s environmental problems.« less
48 CFR 1019.202-70-13 - Developmental assistance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 1019.202-70-13 Developmental assistance. The forms of developmental assistance a mentor can provide to a protégé include: (a) Management guidance relating to financial management, organizational management, overall business management/planning, business development...
Division of Forestry Fire and Aviation Program
Conservation Education Timber Management Wildland Fire & Aviation Burn Permits Firewise Alaska Brochure (PDF) Fire Management Plans Fire Assignments Annual Fire Statistics Fire Terms Glossary Incident Business Management Grants Become an Alaska Firewise Community Community Wildland Fire Protection Plans
DOT National Transportation Integrated Search
2002-04-20
The Long Island Transportation Plan to Manage Congestion (LITP 2000) will establish an integrated, multi-modal transportation program of cost-effective strategies to manage congestion and improve the movement of people and goods in Nassau and Suffolk...
Fuzzy robust credibility-constrained programming for environmental management and planning.
Zhang, Yimei; Hang, Guohe
2010-06-01
In this study, a fuzzy robust credibility-constrained programming (FRCCP) is developed and applied to the planning for waste management systems. It incorporates the concepts of credibility-based chance-constrained programming and robust programming within an optimization framework. The developed method can reflect uncertainties presented as possibility-density by fuzzy-membership functions. Fuzzy credibility constraints are transformed to the crisp equivalents with different credibility levels, and ordinary fuzzy inclusion constraints are determined by their robust deterministic constraints by setting a-cut levels. The FRCCP method can provide different system costs under different credibility levels (lambda). From the results of sensitivity analyses, the operation cost of the landfill is a critical parameter. For the management, any factors that would induce cost fluctuation during landfilling operation would deserve serious observation and analysis. By FRCCP, useful solutions can be obtained to provide decision-making support for long-term planning of solid waste management systems. It could be further enhanced through incorporating methods of inexact analysis into its framework. It can also be applied to other environmental management problems.
Transit management certificate program.
DOT National Transportation Integrated Search
2012-07-01
TTI worked closely with the Landscape Architecture and Urban Planning Department : (LAUP) of Texas A&M University (TAMU) to develop a transit management certificate : focus for the current Graduate Certificate in Transportation Planning (CTP) housed ...
ERIC Educational Resources Information Center
Association of Research Libraries, Washington, DC. Office of Management Studies.
This report describes the following 1985 Office of Management Studies (OMS) programs and services: (1) the Academic Library Program (ALP), which includes the Organizational Screening Program, the Collection Analysis Project (CAP), the Preservation Planning Program (PPP), the Public Services Study (PSS), the Management Review and Analysis Program…
44 CFR Appendix B to Part 62 - National Flood Insurance Program
Code of Federal Regulations, 2010 CFR
2010-10-01
... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false National Flood Insurance Program B Appendix B to Part 62 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... Plan to Maintain Financial Control for Business Written Under the Write Your Own Program. (a) In...
The chronic care model versus disease management programs: a transaction cost analysis approach.
Leeman, Jennifer; Mark, Barbara
2006-01-01
The present article applies transaction cost analysis as a framework for better understanding health plans' decisions to improve chronic illness management by using disease management programs versus redesigning care within physician practices.
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
Phase C/D program development plan. Volume 1: Program plan
NASA Technical Reports Server (NTRS)
1971-01-01
The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.
Developing a Management Curriculum for a Cytotechnology Training Program.
ERIC Educational Resources Information Center
Miller, Maureen E.
This study reviewed the literature in the field of health care management, particularly that which pertains to the management of the clinical laboratory. The research cited should help cytotechnology educators in planning a management curriculum and developing program objectives to train cytotechnologists in management. The report is an annotated…
Utilization of Information Provided by the Wisconsin Management System.
ERIC Educational Resources Information Center
Rossmiller, Richard A.
The management system developed by the Wisconsin Center for Cognitive Learning (CCL) is useful to principal investigators of individual projects for proposal development, project management, and project reporting, as well as to the CCL management for program planning, program management, and reporting to funding agencies. The system aids proposal…
40 CFR 130.5 - Continuing planning process.
Code of Federal Regulations, 2010 CFR
2010-07-01
... QUALITY PLANNING AND MANAGEMENT § 130.5 Continuing planning process. (a) General. Each State shall... the Act. Each State is responsible for managing its water quality program to implement the processes... quality standards in effect under authority of section 303 of the Act. (2) The process for incorporating...
40 CFR 130.5 - Continuing planning process.
Code of Federal Regulations, 2011 CFR
2011-07-01
... QUALITY PLANNING AND MANAGEMENT § 130.5 Continuing planning process. (a) General. Each State shall... the Act. Each State is responsible for managing its water quality program to implement the processes... quality standards in effect under authority of section 303 of the Act. (2) The process for incorporating...
40 CFR 130.5 - Continuing planning process.
Code of Federal Regulations, 2014 CFR
2014-07-01
... QUALITY PLANNING AND MANAGEMENT § 130.5 Continuing planning process. (a) General. Each State shall... the Act. Each State is responsible for managing its water quality program to implement the processes... quality standards in effect under authority of section 303 of the Act. (2) The process for incorporating...
OSFA Goals and Objectives System: Strategies for Improved Program Planning and Management.
ERIC Educational Resources Information Center
Advanced Technology, Inc., Reston, VA.
The purpose and function of the Goals and Objectives System of the U.S. Office of Student Financial Assistance (OSFA) are discussed. Results of a review of the system, policy issues, and a strategy for improving the system in OSFA program planning and management are also addressed. The system identifies a structure for work activities in OSFA and…
ERIC Educational Resources Information Center
Anderson, Nancy; And Others
This is one of a set of five handbooks compiled by the Northwest Regional Educational Laboratory that describes the processes for planning and operating a total experience-based career education (EBCE) program. Processes and material are those developed by the original EBCE model--Community Experience in Career Education (CE)2. The area of…
NOSC (Naval Ocean Systems Center) Program Manager’s Handbook.
1986-07-01
impact downstream on other obligations-can wreck the best program through loss of performance, credibility, sponsorship, and future opportunity...planning sessions should be alert to external constraints that may impact on the timely completion of the project. Networking, through planning sessions...schedule, will have significant impact on the project. One of the most important functions of project management
Speed management program plan.
DOT National Transportation Integrated Search
2014-05-01
Changing public attitudes regarding speeding and speed management will require a comprehensive and concerted effort, involving a wide variety of strategies. This plan identifies six primary focus areas: : A. Data and Data-Driven Approaches, : B. Rese...
Survey of emergency medicine resident debt status and financial planning preparedness.
Glaspy, Jeffrey N; Ma, O John; Steele, Mark T; Hall, Jacqueline
2005-01-01
Most resident physicians accrue significant financial debt throughout their medical and graduate medical education. The objective of this study was to analyze emergency medicine resident debt status, financial planning actions, and educational experiences for financial planning and debt management. A 22-item questionnaire was sent to all 123 Accreditation Council on Graduate Medical Education-accredited emergency medicine residency programs in July 2001. Two follow-up mailings were made to increase the response rate. The survey addressed four areas of resident debt and financial planning: 1) accrued debt, 2) moonlighting activity, 3) financial planning/debt management education, and 4) financial planning actions. Descriptive statistics were used to analyze the data. Survey responses were obtained from 67.4% (1,707/2,532) of emergency medicine residents in 89 of 123 (72.4%) residency programs. Nearly one half (768/1,707) of respondents have accrued more than 100,000 dollars of debt. Fifty-eight percent (990/1,707) of all residents reported that moonlighting would be necessary to meet their financial needs, and more than 33% (640/1,707) presently moonlight to supplement their income. Nearly one half (832/1,707) of residents actively invested money, of which online trading was the most common method (23.3%). Most residents reported that they received no debt management education during residency (82.1%) or medical school (63.7%). Furthermore, 79.1% (1,351/1,707) of residents reported that they received no financial planning lectures during residency, although 84.2% (1,438/1,707) reported that debt management and financial planning education should be available during residency. Most emergency medicine residency programs do not provide their residents with financial planning education. Most residents have accrued significant debt and believe that more financial planning and debt management education is needed during residency.
NASA Technical Reports Server (NTRS)
Knighton, Donna L.
1992-01-01
A Flight Test Engineering Database Management System (FTE DBMS) was designed and implemented at the NASA Dryden Flight Research Facility. The X-29 Forward Swept Wing Advanced Technology Demonstrator flight research program was chosen for the initial system development and implementation. The FTE DBMS greatly assisted in planning and 'mass production' card preparation for an accelerated X-29 research program. Improved Test Plan tracking and maneuver management for a high flight-rate program were proven, and flight rates of up to three flights per day, two times per week were maintained.
Risk Management for Human Support Technology Development
NASA Technical Reports Server (NTRS)
jones, Harry
2005-01-01
NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.
Materiel Acquisition Management Guide
1980-02-11
Ii-n manager and his staff, hiqhlighted by the specific de - tails provided in tabbea one-sheet descriptions. • Part III - Areas of Aco-uisition...support program requirements? Support and Test Equipment (S/TE)? Spares Support (SS)? Storage and transportation ? training? o Have test and...PACKAGES PROCUREMENT PLANNING/ PROCUREMENT pLANS TEST AND EVALUATION - PLANNING PRODUCIBILITY ENGINEERING AND TRAINING PLANNING (PEP) TRANSPORTABILITY
Marketing and Distributive Education Curriculum Planning Guide.
ERIC Educational Resources Information Center
Northern Illinois Univ., DeKalb. Dept. of Business Education and Administration Services.
This planning guide in marketing and distributive education is designed to provide the curriculum coordinator and instructor with a basis for planning a comprehensive program in the career field of marketing. Such programs require competencies in sales, sales promotion, buying, transporting, storing, financing, marketing research, and management.…
Evidence-Based Medicine in Managed Care: A Survey of Current and Emerging Strategies
Keckley, Paul H
2004-01-01
Background Evidence-based medicine is the “conscientious application of scientific best practice by clinicians in concert with patient understanding and values.”[1] Recent studies by the Institute of Medicine, RAND, and others have called attention to the gap between scientifically supported approaches to care and day-to-day practice by clinicians. Compounding the problem of non-adherence by providers, researchers have observed that patient compliance also falls short. As a result, avoidable costs from inappropriate variability in practice patterns coupled with patient noncompliance are a significant focus of managed care. Managed care plans play a key role in the selection of providers by consumers and in the design of benefits programs by employers. Avoidable costs from misuse, overuse, and under-use of care from clinicians is a strategic focus for health plans. The evidence upon which a plan makes coverage decisions and the incorporation of evidence in programs targeting providers, employers, and consumers was a focus of this study. Methodology A Delphi survey and 2-day interactive sessions with 128 clinical program directors and medical officers from 89 health plans were the primary methods used in this descriptive analysis. To test participant applications of evidence-based medicine in health plan medical management strategy, 3 conditions were used for illustrative purpose: managing rheumatoid arthritis, increasing remission in depression, and reducing heart disease among diabetics. Each provided a unique challenge to plans in terms of condition prevalence, strength of evidence, and cost. Key Findings Health plans incorporate evidence-based medicine in 5 areas overseen by medical management: (1) coverage decisions wherein improvements in pharmaceutical and therapeutic review processes are sought, (2) disease management efforts wherein increased attention to secondary prevention is desirable, (3) provider profiling wherein increased use of adherence measures comparing practices is a focus, (4) pay-for-performance programs linking physician adherence to financial incentives, and (5) consumer-directed care programs wherein patient compliance to evidence-based treatment directives is the focus. Factors that influence a plan's approach to a patient population include prevalence of the condition, the strength of evidence about a particular diagnostic or prognostic strategy, costs associated with the condition, and the influence of employers in coverage decisions. Conclusion Evidence-based medicine is the foundation for significant activity among plans to increase physician and patient adherence. There remain significant challenges in the implementation of evidence-based care management by plans, including the willingness of plans to agree on evidence-based guidelines, the willingness of employers to pay for evidence-based interventions, the balance of short- and long-term benefits for evidence-based interventions where secondary prevention is a consideration, and substantial distrust among providers. PMID:15266281
Setting up an Asbestos Operations and Maintenance (O&M) Program
Covers steps a buidling's O&M plan should including: appointing an asbestos program manager, inspecting the building, developing a plan, and if necessary selecting and implementing larger repair or abatement projects.
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
7 CFR 25.401 - Responsibility of lead managing entity.
Code of Federal Regulations, 2011 CFR
2011-01-01
... lead managing entity will be responsible for strategic plan program activities and monitoring the fiscal management of the funds of the Empowerment Zone or Enterprise Community. (b) Reporting. The lead.... All entities with significant involvement in implementing the strategic plan shall cooperate with the...
7 CFR 25.401 - Responsibility of lead managing entity.
Code of Federal Regulations, 2010 CFR
2010-01-01
... lead managing entity will be responsible for strategic plan program activities and monitoring the fiscal management of the funds of the Empowerment Zone or Enterprise Community. (b) Reporting. The lead.... All entities with significant involvement in implementing the strategic plan shall cooperate with the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... PREVENTION REQUIREMENTS; RISK MANAGEMENT PROGRAMS UNDER THE CLEAN AIR ACT SECTION 112(r)(7); DISTRIBUTION OF... part of risk management plans. This part governs access by the public and by government officials to the portions of risk management plans containing the results of those analyses and certain related...
Code of Federal Regulations, 2010 CFR
2010-07-01
... PREVENTION REQUIREMENTS; RISK MANAGEMENT PROGRAMS UNDER THE CLEAN AIR ACT SECTION 112(r)(7); DISTRIBUTION OF... analysis (OCA) information means sections 2 through 5 of a risk management plan (consisting of an... through 5 of a risk management plan or any Administrator-created electronic database. (k) Off-site...
Choudhry, Niteesh K; Fischer, Michael A; Smith, Benjamin F; Brill, Gregory; Girdish, Charmaine; Matlin, Olga S; Brennan, Troyen A; Avorn, Jerry; Shrank, William H
2014-03-01
Value-based insurance design (VBID) plans selectively lower cost sharing to increase medication adherence. Existing plans have been structured in a variety of ways, and these variations could influence the effectiveness of VBID plans. We evaluated seventy-six plans introduced by a large pharmacy benefit manager during 2007-10. We found that after we adjusted for the other features and baseline trends, VBID plans that were more generous, targeted high-risk patients, offered wellness programs, did not offer disease management programs, and made the benefit available only for medication ordered by mail had a significantly greater impact on adherence than plans without these features. The effects were as large as 4-5 percentage points. These findings can provide guidance for the structure of future VBID plans.
Managing a palliative oncology program: the role of a business plan.
Walsh, D; Gombeski, W R; Goldstein, P; Hayes, D; Armour, M
1994-02-01
Today's health-care environment demands that palliative-care programs operate in a businesslike manner. This report summarizes the business plan and the process followed to develop the Palliative Care Program at the Cleveland Clinic Foundation (CCF). The benefits generated from this effort and the lessons learned that may be helpful to other program managers are described. By disciplining itself to focus on financial, marketing, and operational issues, the Palliative Care Program is in a better position to advance its clinical services within the organization and in its market area, and can thereby serve its patients more effectively.
Case Management: Let Us Count the Ways.
ERIC Educational Resources Information Center
Austin, Carol D.
Case management as implemented in programs for the elderly, has focused on interactions between the client and case manager in the areas of assessment, care planning, service plan implementation, and follow-up. Variation in these case management tasks suggests that no single model can be implemented in all local delivery systems. This emphasis on…
A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki
NASA Technical Reports Server (NTRS)
Delaney, Michael M.; Koshimoto, Edwin T.; Noble, Deleena; Duggan, Christopher
2010-01-01
The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.
Evaluating forest management policies by parametric linear programing
Daniel I. Navon; Richard J. McConnen
1967-01-01
An analytical and simulation technique, parametric linear programing explores alternative conditions and devises an optimal management plan for each condition. Its application in solving policy-decision problems in the management of forest lands is illustrated in an example.
25 CFR 170.500 - What program reviews do the Secretaries conduct?
Code of Federal Regulations, 2010 CFR
2010-04-01
... Section 170.500 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... planning; (3) Design; (4) Contract administration; (5) Construction; (6) Financial management; and (7...
Emergency Administration and Planning Institute.
ERIC Educational Resources Information Center
Reed, Robert R.
The Emergency Administration and Planning program at the University of North Texas (Denton) is the only undergraduate degree-granting program in emergency management and training in the country. It is a 128-hour program based on a public administration curriculum, with additional coursework in behavioral analysis, sociology, rehabilitative…
The Development of Kidney Stone Dietary Plans for Patient Education
ERIC Educational Resources Information Center
Dennison, Darwin; Mayo, M. Leah; Abraham, Victor E.
2011-01-01
Currently patient education programs and urology practices provide individuals with "lists of foods to avoid" for dietary management of kidney stones. However, "planned diets" that include daily meal plans and recipes provide structure and specificity for diet management and are preferred by many individuals. This article describes the development…
7 CFR 1948.57 - Eligible activities.
Code of Federal Regulations, 2011 CFR
2011-01-01
... percent of the total cost of developing growth management and/or housing plans. (2) One hundred percent of the cost of developing aspects of growth management plans and/or housing plans including but not... Program § 1948.57 Eligible activities. Grant Funds may be used for: (a) The preparation of growth...
43 CFR 1610.3-1 - Coordination of planning efforts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Coordination of planning efforts. 1610.3-1 Section 1610.3-1 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource...
Integrating telemedicine and telehealth: putting it all together.
Weinstein, Ronald S; Lopez, Ana Maria; Krupinski, Elizabeth A; Beinar, Sandra J; Holcomb, Michael; McNeely, Richard A; Latifi, Rifat; Barker, Gail
2008-01-01
Telemedicine and telehealth programs are inherently complex compared with their traditional on-site health care delivery counterparts. Relatively few organizations have developed sustainable, multi-specialty telemedicine programs, although single service programs, such as teleradiology and telepsychiatry programs, are common. A number of factors are barriers to the development of sustainable telemedicine and telehealth programs. First, starting programs is often challenging since relatively few organizations have, in house, a critical mass of individuals with the skill sets required to organize and manage a telemedicine program. Therefore, it is necessary to "boot strap" many of the start-up activities using available personnel. Another challenge is to assemble a management team that has time to champion telemedicine and telehealth while dealing with the broad range of issues that often confront telemedicine programs. Telemedicine programs housed within a single health care delivery system have advantages over programs that serve as umbrella telehealth organizations for multiple health care systems. Planning a telemedicine program can involve developing a shared vision among the participants, including the parent organizations, management, customers and the public. Developing shared visions can be a time-consuming, iterative process. Part of planning includes having the partnering organizations and their management teams reach a consensus on the initial program goals, priorities, strategies, and implementation plans. Staffing requirements of telemedicine and telehealth programs may be met by sharing existent resources, hiring additional personnel, or outsourcing activities. Business models, such as the Application Service Provider (ASP) model used by the Arizona Telemedicine Program, are designed to provide staffing flexibility by offering a combination of in-house and out-sourced services, depending on the needs of the individual participating health care organizations. Telemedicine programs should perform ongoing assessments of activities, ranging from service usage to quality of service assessments, to ongoing analyses of financial performance. The financial assessments should include evaluations of costs and benefits, coding issues, reimbursement, account receivables, bad debt and network utilization. Long-range strategic planning for a telemedicine and telehealth program should be carried out on an on-going basis and should include the program's governing board. This planning process should include goal setting and the periodic updating of the program's vision and mission statements. There can be additional special issues for multi-organization telemedicine and telehealth programs. For example, authority management can require the use of innovative approaches tailored to the realities of the organizational structures of the participating members. Inter-institutional relations may introduce additional issues when competing health care organizations are utilizing shared resources. Branding issues are preferably addressed during the initial planning of a multi-organizational telemedicine and telehealth program. Ideally, public policy regarding telemedicine and telehealth within a service region will complement the objectives of telemedicine and telehealth programs within that service area.
Amey, E.B.; Russell, J.A.; Hurdelbrink, R.J.
1996-01-01
In 1976, the U.S. Congress enacted the Resource Conservation and Recovery Act (RCRA) to further address the problem of increasing industrial and municipal waste. The main objectives of RCRA were to responsibly manage hazardous and solid waste and to procure materials made from recovered wastes. To fulfill these objectives, four main programs of waste management were developed. These programs were defined under Subtitle C, the Hazardous Waste Program; Subtitle D, the Solid Waste Program; Subtitle I, the Underground Storage Tank Program; and Subtitle J, the Medical Waste Program. Subtitle D illustrates the solid waste dilemma occurring in the United States. Under this program, states are encouraged to develop and implement their own waste management plans. These plans include the promotion of recycling solid wastes and the closing and upgrading of all environmentally unsound dumps. ?? 1996 International Association for Mathematical Geology.
A concept for performance management for Federal science programs
Whalen, Kevin G.
2017-11-06
The demonstration of clear linkages between planning, funding, outcomes, and performance management has created unique challenges for U.S. Federal science programs. An approach is presented here that characterizes science program strategic objectives by one of five “activity types”: (1) knowledge discovery, (2) knowledge development and delivery, (3) science support, (4) inventory and monitoring, and (5) knowledge synthesis and assessment. The activity types relate to performance measurement tools for tracking outcomes of research funded under the objective. The result is a multi-time scale, integrated performance measure that tracks individual performance metrics synthetically while also measuring progress toward long-term outcomes. Tracking performance on individual metrics provides explicit linkages to root causes of potentially suboptimal performance and captures both internal and external program drivers, such as customer relations and science support for managers. Functionally connecting strategic planning objectives with performance measurement tools is a practical approach for publicly funded science agencies that links planning, outcomes, and performance management—an enterprise that has created unique challenges for public-sector research and development programs.
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for horticulture I and II. Presented first are a program description and…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-15
... CONTACT: Ms. Theresa Claxton, Planning and Program Management Team Leader, Federal Highway Administration... INFORMATION: The FHWA, in cooperation with the Tennessee Department of Transportation (TDOT), is rescinding... programs and activities apply to this proposed program.) Theresa Claxton, Planning and Program Mgmt. Team...
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for welding I and II. Presented first are a program description and course…
Goal programming for land use planning.
Enoch F. Bell
1976-01-01
A simple transformation of the linear programing model used in land use planning to a goal programing model allows the multiple goals implied by multiple use management to be explicitly recognized. This report outlines the procedure for accomplishing the transformation and discusses problems with use of goal programing. Of particular concern are the expert opinions...
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for agriscience I and II. Presented first are a program description and…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for automotive mechanics I and II. Presented first are a program description…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for allied health I and II. Presented first are a program description and…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for the introduction to agriscience program. Presented first are a program…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clark, C. Jr.; Hunt-Davenport, L.D.; Cofer, G.H.
1995-03-01
This Waste Management/Waste Certification (C) Plan, written for the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL), outlines the criteria and methodologies to be used in the management of waste generated during ORNL ER field activities. Other agreed upon methods may be used in the management of waste with consultation with ER and Waste Management Organization. The intent of this plan is to provide information for the minimization, handling, and disposal of waste generated by ER activities. This plan contains provisions for the safe and effective management of waste consistent with the U.S. Environmental Protection Agency`s (EPA`s) guidance.more » Components of this plan have been designed to protect the environment and the health and safety of workers and the public. It, therefore, stresses that investigation derived waste (IDW) and other waste be managed to ensure that (1) all efforts be made to minimize the amount of waste generated; (2) costs associated with sampling storage, analysis, transportation, and disposal are minimized; (3) the potential for public and worker exposure is not increased; and (4) additional contaminated areas are not created.« less
The paper discusses the Environmental Protection Agency's (EPA) Air and Energy Engineering Research Laboratory (AEERL) research plan for work in the global climate area. The plan, written for discussion with senior scientists and program managers at EPA's Global Climate Change Re...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-12
... ozone maintenance plans. The Indiana Department of Environmental Management (IDEM) submitted this... Promulgation of Implementation Plans; Indiana; Removal of Vehicle Inspection and Maintenance Programs for Clark... to allow the State to discontinue the vehicle inspection and maintenance (I/M) program in Clark and...
34 CFR 606.10 - What activities may and may not be carried out under a grant?
Code of Federal Regulations, 2014 CFR
2014-07-01
..., and student service programs designed to improve academic success. (6) Funds management... development courses. (6) Developing or improving community-based or community services programs, unless the...) Planning grants. Under a planning grant, a grantee shall formulate— (1) A comprehensive development plan...
34 CFR 606.10 - What activities may and may not be carried out under a grant?
Code of Federal Regulations, 2013 CFR
2013-07-01
..., and student service programs designed to improve academic success. (6) Funds management... development courses. (6) Developing or improving community-based or community services programs, unless the...) Planning grants. Under a planning grant, a grantee shall formulate— (1) A comprehensive development plan...
34 CFR 606.10 - What activities may and may not be carried out under a grant?
Code of Federal Regulations, 2012 CFR
2012-07-01
..., and student service programs designed to improve academic success. (6) Funds management... development courses. (6) Developing or improving community-based or community services programs, unless the...) Planning grants. Under a planning grant, a grantee shall formulate— (1) A comprehensive development plan...
44 CFR 351.20 - The Federal Emergency Management Agency.
Code of Federal Regulations, 2012 CFR
2012-10-01
... plans. (f) Assess, with the assistance of other Federal agencies, the adequacy of State and local... emergency plans and preparedness. (i) Develop and manage a radiological emergency response training program... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true The Federal Emergency...
44 CFR 351.20 - The Federal Emergency Management Agency.
Code of Federal Regulations, 2011 CFR
2011-10-01
... plans. (f) Assess, with the assistance of other Federal agencies, the adequacy of State and local... emergency plans and preparedness. (i) Develop and manage a radiological emergency response training program... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false The Federal Emergency...
AUA Program Master Plan. Volume 1: Overview
DOT National Transportation Integrated Search
1997-03-01
The Office of Air Traffic Systems Development (AUA) Program Master Plan : summarizes the management, development approach, and status of products and : services provided by the AUA organization to fulfill its role in supporting : National Airspace Sy...
Primary Immune Deficiency Diseases
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
Wiskott-Aldrich Syndrome (WAS)
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
Respiratory Syncytial Virus (RSV): Treatment
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
A Guide for Planning Occupational Programs in Farm Production and Management.
ERIC Educational Resources Information Center
New York State Education Dept., Albany. Bureau of Secondary Curriculum Development.
Intended for personnel in charge of establishing and conducting programs in farm production and management, the guide reflects the changes in farming by emphasizing farm business management and farm mechanization. The introductory chapter suggests criteria for selecting students and lists some of the occupations for which the program will provide…
14 CFR 91.1029 - Flight scheduling and locating requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... program manager must establish and use an adequate system to schedule and release program aircraft. (b) Except as provided in paragraph (d) of this section, each program manager must have adequate procedures... manager with at least the information required to be included in a VFR flight plan; (2) Provide for timely...
The San Francisco Joint Institutional Transportation Systems Management Program.
ERIC Educational Resources Information Center
Fink, Ira; LaPointe, Robert
1981-01-01
Transportation systems management (TSM) programs are discussed, particularly the 1977 program of the University of California, San Francisco, which led to traffic reduction and improved vehicle flow. The city's implementation plan for a similar TSM program for 14 educational institutions and hospitals is described. (MLW)
San Diego Multiple Species Conservation Program (MSCP) Rare Plant Monitoring Review and Revision
McEachern, Kathryn; Pavlik, Bruce M.; Rebman, Jon; Sutter, Rob
2007-01-01
Introduction The San Diego Multiple Species Conservation Program (MSCP) was developed for the conservation of plants and animals in the south part of San Diego County, under the California Natural Community Conservation Planning Act of 1991 (California Department of Fish and Game) and the Federal Endangered Species Act of 1973, as amended (16 U.S. Code 1531-1544.) The Program is on the leading edge of conservation, as it seeks to both guide development and conserve at-risk species with the oversight of both State and Federal agencies. Lands were identified for inclusion in the MSCP based on their value as habitat for at-risk plants or plant communities (Natural Community Conservation Planning, 2005). Since its inception in the mid-1990s the Program has protected over 100,000 acres, involving 15 jurisdictions and the U.S. Fish and Wildlife Service (USFWS) and California Department of Fish and Game (CDFG) in the conservation of 87 taxa. Surveys for covered species have been conducted, and management and monitoring have been implemented at some high priority sites. Each jurisdiction or agency manages and monitors their conservation areas independently, while collaborating regionally for long-term protection. The San Diego MSCP is on the forefront of conservation, in one of the most rapidly growing urban areas of the country. The planning effort that developed the MSCP was state-of-the-art, using expert knowledge, spatial habitat modeling, and principles of preserve design to identify and prioritize areas for protection. Land acquisition and protection are ahead of schedule for most jurisdictions. Surveys have verified the locations of many rare plant populations known from earlier collections, and they provide general information on population size and health useful for further conservation planning. Management plans have been written or are in development for most MSCP parcels under jurisdictional control. Several agencies are developing databases for implementation and management tracking. In many ways this program is at the cutting edge of regional conservation, testing concepts, developing techniques, and demonstrating conservation effectiveness in new and uncharted ways. Periodic program review is crucial to the continued success of the program, as it moves from a phase of planning and acquisition to one of management and monitoring. Ecological monitoring is the key to assessing the success of the protection and management implemented at each individual reserve and for the MSCP as a whole. The ultimate goal of the Program is conservation of at-risk taxa and their habitats, as well as underlying ecological processes that contribute to sustainability of the ecosystem. Monitoring guidelines and timetables were developed by Ogden Environmental and Energy Services Co., Inc. (1996), and reviewed by Conservation Biology Institute (2001). The Program is in transition now, from the initial stage of land protection to one of land management and monitoring to determine population responses to management regimes. Several agencies have already invested substantial effort in status and trend monitoring, while others are developing their monitoring plans. Management is ongoing at several sites. With both management and monitoring, collaboration and coordination among jurisdictions can be especially fruitful in conserving resources and maximizing success.
Planning Management Training Programs for Organizational Development
ERIC Educational Resources Information Center
Alpander, Guvenc G.
1974-01-01
To investigate means of converting management development programs into a successful organizational development process, managers' attitudes toward centralization and decentralization of functions and decisions, the importance of performed functions, their personal effectiveness, their managerial style, and what they prefer for executive…
OVERVIEW OF THE INTRAMURAL RISK MANAGEMENT RESEARCH PROGRAM
This presentation will provide a summary of the risk management portion of ORD's endocrine disrupting chemicals (EDCs) research program, including its motivation, goals, planning efforts and resulting research areas.
In an emerging research area like EDCs, risk management ...
Report #09-P-0130, March 30, 2009. The two Region 8 offices jointly responsible for implementing the CAA 112(r) Risk Management Program have not effectively planned or coordinated compliance assurance activities.
Randy Molina; Bruce G. Marcot; Robin Lesher
2006-01-01
The Survey and Manage Program of the Northwest Forest Plan (MFP) represents an unparalleled attempt to protect rare, little-known species associated with late-successional and old-growth forests on more than 7.7 million ha of federal lands. Approximately 400 species of amphibians, bryophytes, fungi, lichens, mollusks, vascular plants, arthropod functional groups, and...
ERIC Educational Resources Information Center
Green, Stephen; And Others
This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Colorado State University Library (CSUL) working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). Designed to put self-help tools into the hands of library staff responsible for developing plans and procedures…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-21
...NMFS publishes regulations to implement Amendment 86 to the Fishery Management Plan for Groundfish of the Bering Sea and Aleutian Islands Management Area and Amendment 76 to the Fishery Management Plan for Groundfish of the Gulf of Alaska (Amendments 86/76). Amendments 86/ 76 add a funding and deployment system for observer coverage to the existing North Pacific Groundfish Observer Program (Observer Program) and amend existing observer coverage requirements for vessels and processing plants. The new funding and deployment system allows NMFS to determine when and where to deploy observers according to management and conservation needs, with funds provided through a system of fees based on the ex-vessel value of groundfish and halibut in fisheries covered by the new system. This action is necessary to resolve data quality and cost equity concerns with the Observer Program's existing funding and deployment structure. This action is intended to promote the goals and objectives of the Magnuson-Stevens Fishery Conservation and Management Act, the Northern Pacific Halibut Act of 1982, the fishery management plans, and other applicable law.
Craig Palmer; Barry Mulder; Barry Noon
2000-01-01
The Northwest Forest Plan is a large-scale ecosystem management plan for federal lands in the Pacific Northwest of the United States. An effectiveness monitoring program has been developed to determine the extent to which the goals and objectives of this Plan are being achieved. Priority resources identified for ecological monitoring include late-successional and old-...
ERIC Educational Resources Information Center
Cole, R. D.; Hamreus, D. G.
This appendix presents the following tables of program component cost estimates: 1) instructional design and development; 2) instructional operations; 3) program management--policy creation and adoption, and policy and program execution; 4) program coordination--instructional objectives, adaptation, accommodation, and dissemination; 5) general…
BARATARIA-TERREBONNE NATIONAL ESTUARY PROGRAM IMPLEMENTATION REVIEW REPORT, 2001-2003
From January 2001 through December 2003, BTNEP made significant progress on implementation of its Comprehensive Conservation Management Plan (CCMP). Notable accomplishments during this period occurred in the areas of coordinated planning and implementation, ecological management,...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., each Federal department and agency shall prepare its national security emergency preparedness plans and... preparedness plans and programs to provide appropriate and effective response options for consideration in... Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY...
40 CFR 256.11 - Recommendations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... authorized State hazardous waste management program under subtitle C of the Act. (e) The State plan should... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Identification of Responsibilities...
40 CFR 256.11 - Recommendations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... authorized State hazardous waste management program under subtitle C of the Act. (e) The State plan should... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Identification of Responsibilities...
Water Management Plan for Fort Buchanan, Puerto Rico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chvala, William D.; Sullivan, Gregory P.; Mcmordie, Katherine
2004-06-01
This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Water Management Plan (WMP). The WRMP developed during this task is an amalgam of the templates and guidelines from the Federal Energy Management Program and Army regulations.
33 CFR 385.11 - Implementation process for projects.
Code of Federal Regulations, 2010 CFR
2010-07-01
... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Amendment. 1610.5-5 Section 1610.5-5 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.5-5 Amendment. A resource...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Amendment. 1610.5-5 Section 1610.5-5 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.5-5 Amendment. A resource...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Amendment. 1610.5-5 Section 1610.5-5 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.5-5 Amendment. A resource...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Amendment. 1610.5-5 Section 1610.5-5 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.5-5 Amendment. A resource...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-16
... the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District (YSAQMD) portion of the California State.... ``Improving Air Quality with Economic Incentive Programs,'' EPA- 452/R-01-001, January 2001. B. Does the rule...
40 CFR 262.102 - What special definitions are included in this subpart?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Laboratories XL Project-Laboratory Environmental Management Standard § 262.102 What special definitions are... Laboratory Waste means a laboratory waste, defined in the Environmental Management Plan as posing significant... Management Plan (EMP) means a written program developed and implemented by the university which sets forth...
33 CFR 385.11 - Implementation process for projects.
Code of Federal Regulations, 2011 CFR
2011-07-01
... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...
33 CFR 385.11 - Implementation process for projects.
Code of Federal Regulations, 2014 CFR
2014-07-01
... figure 1 in appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...
33 CFR 385.11 - Implementation process for projects.
Code of Federal Regulations, 2012 CFR
2012-07-01
... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...
33 CFR 385.11 - Implementation process for projects.
Code of Federal Regulations, 2013 CFR
2013-07-01
... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...
Integrated Riparian Area Management on the Tule Lake Allotment, Lassen County
Bill Flournoy; Don Lancaster; Paul Roush
1989-01-01
The Bureau of Land Management, Alturas Resource Area with the cooperation of the Tule Lake Allotment permittees and private landowners has embarked on a riparian enhancement program for the allotment which crosses many traditional boundaries and barriers in land management and land management planning. Currently in the plan development stages the concept provides for a...
25 CFR 170.503 - How are IRR Program management systems funded?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false How are IRR Program management systems funded? 170.503 Section 170.503 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...
National Institute of Allergy and Infectious Diseases
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
Warts, Hypogammaglobulinemia, Infections, and Myelokathexis Syndrome (WHIMS)
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
Types of HIV/AIDS Antiretroviral Drugs
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
Water Management Planning: A Case Study at Blue Grass Army Depot
DOE Office of Scientific and Technical Information (OSTI.GOV)
Solana, Amy E.; Mcmordie, Katherine
2006-04-03
Executive Order 13123, Greening the Government Through Efficient Energy Management, mandates an aggressive policy for reducing potable water consumption at federal facilities. Implementation guid¬ance from the U.S. Department of Energy (DOE) set a requirement for each federal agency to “reduce potable water usage by implementing life cycle, cost-effective water efficiency programs that include a water management plan, and not less than four Federal Energy Management Program (FEMP) Best Manage¬ment Practices (BMPs).” The objective of this plan is to gain full compliance with Executive Order 13123 and associated DOE implementation guidance on behalf of Blue Grass Army Depot (BGAD), Richmond, Kentucky.more » In accordance with this plan, BGAD must: • Incorporate the plan as a component of the Installation energy conservation plan • Investigate the water savings potential and life-cycle cost effectiveness of the Operations and Maintenance (O&M) and retrofit/replacement options associated with the ten FEMP BMPs • Put into practice all applicable O&M options • Identify retrofit/replacement options appropriate for implementation (based upon calculation of the simple payback periods) • Establish a schedule for implementation of applicable and cost-effective retrofit/replacement options.« less
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for secondary-level courses to prepare Mississippi vocational students for…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-14
...; State Administrative Plan for the Hazard Mitigation Grant Program AGENCY: Federal Emergency Management...: Collection of Information Title: State Administrative Plan for the Hazard Mitigation Grant Program. Type of... guide that details how the State will administer the Hazard Mitigation Grant Program (HMGP). An approved...
Small grant management in health and behavioral sciences: Lessons learned.
Sakraida, Teresa J; D'Amico, Jessica; Thibault, Erica
2010-08-01
This article describes considerations in health and behavioral sciences small grant management and describes lessons learned during post-award implementation. Using the components by W. Sahlman [Sahlman, W. (1997). How to write a great business plan. Harvard Business Review, 75(4), 98-108] as a business framework, a plan was developed that included (a) building relationships with people in the research program and with external parties providing key resources, (b) establishing a perspective of opportunity for research advancement, (c) identifying the larger context of scientific culture and regulatory environment, and (d) anticipating problems with a flexible response and rewarding teamwork. Small grant management included developing a day-to-day system, building a grant/study program development plan, and initiating a marketing plan. Copyright 2010 Elsevier Inc. All rights reserved.
ERIC Educational Resources Information Center
Kim, Yeonsoo
2010-01-01
This article proposes a model for planning and operating an effective succession planning and management (SP&M) program and measuring its value. The nature of the research is exploratory, following a qualitative approach using in-depth interviews. Representatives of multinational companies interviewed for this study revealed that succession…
Manpower Goals Planning and Accountability. Research Report 34.
ERIC Educational Resources Information Center
Niehaus, R. J.; Nitterhouse, D.
Based on previous application of goal programming models to manpower goals planning for large organizations, this paper structures the extensions from the planning process to the operations and control aspects of the management cycle. Emphasis is on the accountability necessary to make such a system an effective management control tool. In order…
Information security management system planning for CBRN facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.
The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.
Program definition and assessment overview. [for thermal energy storage project management
NASA Technical Reports Server (NTRS)
Gordon, L. H.
1980-01-01
The implementation of a program level assessment of thermal energy storage technology thrusts for the near and far term to assure overall coherent energy storage program is considered. The identification and definition of potential thermal energy storage applications, definition of technology requirements, and appropriate market sectors are discussed along with the necessary coordination, planning, and preparation associated with program reviews, workshops, multi-year plans and annual operating plans for the major laboratory tasks.
7 CFR 246.19 - Management evaluation and monitoring reviews.
Code of Federal Regulations, 2014 CFR
2014-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...
7 CFR 246.19 - Management evaluation and monitoring reviews.
Code of Federal Regulations, 2012 CFR
2012-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...
7 CFR 246.19 - Management evaluation and monitoring reviews.
Code of Federal Regulations, 2013 CFR
2013-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...
7 CFR 246.19 - Management evaluation and monitoring reviews.
Code of Federal Regulations, 2010 CFR
2010-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...
7 CFR 246.19 - Management evaluation and monitoring reviews.
Code of Federal Regulations, 2011 CFR
2011-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN Monitoring and Review § 246.19 Management evaluation and monitoring reviews... reports, the development of corrective action plans to resolve Program deficiencies, the monitoring of the...
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for small engine repair I and II. Presented first are a program description…
Evaluation of the Implementation of Operations and Maintenance Programs in New Jersey Schools.
ERIC Educational Resources Information Center
Kominsky, John R.; Freyberg, Ronald W.; Gerber, Donald R.; Centifonti, Gary J.
All schools are required to develop and implement an asbestos management plan (AMP). The key component of this plan is each school's operations and maintenance (O&M) program. This report outlines the importance of such programs. It describes an O&M program as an administrative framework that prescribes specific activities and work…
Study of solid rocket motors for a space shuttle booster. Volume 3: Program acquisition planning
NASA Technical Reports Server (NTRS)
Vonderesch, A. H.
1972-01-01
Plans for conducting Phase C/D for a solid rocket motor booster vehicle are presented. Methods for conducting this program with details of scheduling, testing, and program management and control are included. The requirements of the space shuttle program to deliver a minimum cost/maximum reliability booster vehicle are examined.
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for forestry I and II. Presented first are a program description and course…
Management philosophies as applied to major NASA programs
NASA Technical Reports Server (NTRS)
Dannenberg, K. K.
1974-01-01
A definition of 'management philosophies' is discussed explaining the position of NASA in the planning and control of space programs and technology. The impact of these philosophies on the Apollo and Saturn 1 programs are described along with the need for the Saturn 5 spacecraft and launch site development. Case studies are included and describe unscheduled events where management decisions were necessary to keep programs on track.
41 CFR 101-26.506 - Interior planning and design services.
Code of Federal Regulations, 2013 CFR
2013-07-01
... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...
41 CFR 101-26.506 - Interior planning and design services.
Code of Federal Regulations, 2012 CFR
2012-07-01
... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...
41 CFR 101-26.506 - Interior planning and design services.
Code of Federal Regulations, 2011 CFR
2011-07-01
... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...
41 CFR 101-26.506 - Interior planning and design services.
Code of Federal Regulations, 2014 CFR
2014-07-01
... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...
75 FR 70670 - Final Vehicle Safety Rulemaking and Research Priority Plan 2010-2013
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-18
... management tool as well as a means to communicate to the public NHTSA's highest priorities to meet the Nation's motor vehicle safety challenges. Among them are programs and projects involving rollover crashes... in this plan. This plan lists the programs and projects the agency anticipates working on even though...
Web Application Software for Ground Operations Planning Database (GOPDb) Management
NASA Technical Reports Server (NTRS)
Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey
2013-01-01
A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.
ERIC Educational Resources Information Center
Kaiser, Harvey H.; Kirkwood, Dennis M.
2000-01-01
Presents a diagnostic model for assessing the state of an institution's capital programs management (CPM) by delineating "work processes" which comprise that function. What capital programs management is, its resources, and its phases and work processes are described, followed by case studies of the CPM Process Model as an assessment tool. (GR)
ERIC Educational Resources Information Center
Cummings, C. Peter; Cook, Desmond L.
This module is the first in a self-instructional program designed to train public school personnel in how to manage educational projects. These may include federally funded projects (such as Title I projects), court-ordered programs (such as a desegregation plan), or locally initiated projects (such as a new math program). The purpose of this…
Making the connection: advancing traffic incident management in transportation planning : a primer.
DOT National Transportation Integrated Search
2013-07-01
"The intent of this primer is to inform and guide traffic incident management (TIM) professionals and transportation planners to initiate and develop collaborative relationships and advance TIM programs through the metropolitan planning process. The ...
Keller, A
1991-01-01
A diagnosis was conducted of management information systems (MIS) for maternal and child health and family planning programs in 27 African, 5 Asian, and 8 Latin American and Caribbean countries. The diagnosis covered the collection and use of information on physical infrastructure, human resources, equipment/supplies, services provided, coverage attained, and program quality and impact. It was found that many programs do not produce certain basic input and output indicators and that even among those that do, information is too infrequently brought to bear on management decision-making. Constraints under which the MIS operate in these countries are identified, and some rudimentary calculations of what would be required to improve MIS functioning are made.
Joint Exercise Program: DOD Needs to Take Steps to Improve the Quality of Funding Data
2017-02-01
technology systems—the Joint Training Information Management System (JTIMS) and the Execution Management System—to manage the execution of the Joint...Exercise Program, but does not have assurance that funding execution data in the Execution Management System are reliable. JTIMS is the system of record...for the Joint Exercise Program that combatant commanders use to plan and manage their joint training exercises. GAO observed significant variation
ERIC Educational Resources Information Center
Virginia Polytechnic Inst. and State Univ., Blacksburg. Div. of Vocational-Technical Education.
This self-instructional module on developing your sales promotion plan is the fifth in a set of twelve modules designed for small business owner-managers. Competencies for this module are (1) describe the role of advertising, display, and personal selling in a sales promotion plan and (2) develop an effective sales promotion plan which…
Hyper-Immunoglobulin E Syndrome (HIES) or Job's Syndrome
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
ERIC Educational Resources Information Center
Enright, Margaret; Davidson, Tasha
These materials consist of: (1) a planning and implementation handbook designed to help Head Start managers better understand, plan, and implement a more comprehensive aproach to health education and health promotion--one that addresses local needs and tailors programs to the needs of the children, parents, and staff; and (2) a resource guide that…
The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan
NASA Technical Reports Server (NTRS)
Bronstein, L.; Kawamoto, Y.; Riberich, J. J.; Scope, J. R.; Forman, B. J.; Bergman, S. G.; Reisenfeld, S.
1981-01-01
The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.
Strategic survey framework for the Northwest Forest Plan survey and manage program.
Randy Molina; Dan McKenzie; Robin Lesher; Jan Ford; Jim Alegria; Richard Cutler
2003-01-01
This document outlines an iterative process for assessing the information needs for all Northwest Forest Plan (NWFP) survey and manage species, designing and implementing strategic surveys (including field surveys and other information-gathering processes), and analyzing that information for use in the NWFP annual species review and adaptive-management processes. The...
Notification: Review of the Contract Management Assessment Program
Project #OA-FY14-0034, October 30, 2013. The Office of Inspector General plans to begin the preliminary research phase of an audit evaluating the Office of Acquisition Management’s Contract Management Assessment Program (CMAP).
20 CFR 633.203 - Review of funding request.
Code of Federal Regulations, 2010 CFR
2010-04-01
... SEASONAL FARMWORKER PROGRAMS Grant Planning and Application Procedures § 633.203 Review of funding request... farmworkers. (d) General administrative and financial management capability. (e) Prior performance with respect to financial management, audit and program outcomes. ...
Weather integration in TMC operations : a self-evaluation and planning guide.
DOT National Transportation Integrated Search
2009-04-01
This flyer describes how Traffic Management Centers (TMC) can integrate weather information into their daily operations, and is based on the Road Weather Management Program publication, Self-Evaluation and Planning Guide (FHWA-JPO-08-057). The Guide ...
Connected vehicle pilot deployment program phase 1, safety management plan – Tampa (THEA).
DOT National Transportation Integrated Search
2016-04-01
This document presents the Safety Management Plan for the THEA Connected Vehicle (CV) Pilot Deployment. The THEA CV Pilot Deployment goal is to advance and enable safe, interoperable, networked wireless communications among vehicles, the infrastructu...
Home | Sonoma County Water Agency
Precipitation Information (AQPI) Fluoridation Atmospheric Rivers Urban Water Management Plan Flood Protection Advanced Quantitative Precipitation Information (AQPI) Fluoridation Atmospheric Rivers Urban Water Management Plan Flood Protection Flood Forecast/Emergency Info Stream Maintenance Program Flood Protection
... 800-829-4833 va. gov Office of Personnel Management Get information about the Federal Employee Health Benefits (FEHB) Program ... in health plans, including Medicare ■ Medical and case management records (except ... Any other records that contain information that doctors or health plans use to make ...
Characteristics of private-sector managed care for mental health and substance abuse treatment.
Garnick, D W; Hendricks, A M; Dulski, J D; Thorpe, K E; Horgan, C
1994-12-01
This study examined diversity during the late 1980s in managed care programs for mental health, alcohol abuse, and drug abuse to identify ways in which research can generate more meaningful data on the effectiveness of utilization review programs. Telephone interviews were conducted with representatives of utilization review programs for employee health insurance plans in 31 firms that employed 2.1 million people in 1990. Questions addressed qualifications of personnel, clinical criteria to authorize care, integration with employee assistance plans, penalties for not complying with utilization review procedures, outpatient review, and carve out of mental health and substance abuse review. Large variations in utilization review programs were found. Programs employed a range of review personnel and used a variety of clinical criteria to authorize care. More than two-thirds did not carve out mental health and substance abuse review from medical-surgical review. Some firms' employee assistance plans were integrated with utilization review programs, while others remained unintegrated. Penalties for not following program procedures varied widely, as did review of outpatient services. Because of trends toward even more diversity in utilization review programs in the 1990s, research that identifies the specific features of managed care programs that hold most promise for controlling costs while maintaining quality of care will increasingly be needed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
ROOT, R.W.
1999-05-18
This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems.
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for metal trades I, IIA (advanced welding), and IIB (advanced machine shop).…
Integrating Postsecondary Program Planning and Employment Demand. AIR Forum Paper 1978.
ERIC Educational Resources Information Center
Hall, Toni
A major state-coordinated program in Texas is helping education decision makers and the general public who need information about inputs, activities and cost, and also about the results and impacts of educational programs. Educators have encountered two major problems in obtaining information for effective planning and management: the lack of…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for agriculture production I and II. Presented first are a program…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-28
.... FOR FURTHER INFORMATION CONTACT: Ms. Theresa Claxton, Planning and Program Management Team Leader.... 615-781-5770. SUPPLEMENTARY INFORMATION: The FHWA, in cooperation with the Tennessee Department of... program.) Theresa Claxton, Planning and Program Mgmt. Team Leader, Nashville, TN. [FR Doc. 2013-25313...
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in the building trades: building trades I and…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in drafting: drafting I and II. Presented…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in electronics: electronics I and II.…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in carpentry: carpentry I and II. Presented…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).
2016-03-30
This final rule will address the application of certain requirements set forth in the Public Health Service Act, as amended by the Paul Wellstone and Pete Domenici Mental Health Parity and Addiction Equity Act of 2008, to coverage offered by Medicaid managed care organizations, Medicaid Alternative Benefit Plans, and Children’s Health Insurance Programs.
Code of Federal Regulations, 2011 CFR
2011-07-01
... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9010 Definitions. Aggregate costs. The... the estuary. Annual work plan. The plan, developed by the Management Conference each year, which... an estuary in the NEP. National Program Assistance Agreements. Assistance Agreements approved by the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9010 Definitions. Aggregate costs. The... the estuary. Annual work plan. The plan, developed by the Management Conference each year, which... an estuary in the NEP. National Program Assistance Agreements. Assistance Agreements approved by the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9010 Definitions. Aggregate costs. The... the estuary. Annual work plan. The plan, developed by the Management Conference each year, which... an estuary in the NEP. National Program Assistance Agreements. Assistance Agreements approved by the...
Code of Federal Regulations, 2012 CFR
2012-07-01
... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9010 Definitions. Aggregate costs. The... the estuary. Annual work plan. The plan, developed by the Management Conference each year, which... an estuary in the NEP. National Program Assistance Agreements. Assistance Agreements approved by the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9010 Definitions. Aggregate costs. The... the estuary. Annual work plan. The plan, developed by the Management Conference each year, which... an estuary in the NEP. National Program Assistance Agreements. Assistance Agreements approved by the...
Beneficial Uses of Dredged Material Case Study: San Francisco Bay Region
A major interagency, regional planning effort led to the development of the Long-Term Management Strategy and other planning programs in the San Francisco Bay area. These programs incorporate beneficial uses of dredged material into local projects.
Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-12-01
The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts asmore » a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.« less
2006-05-30
implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails
ERIC Educational Resources Information Center
McManis, Gerald L.
The purpose of this manual is to offer assistance to colleges and universities involved with, or interested in, improvement in their fundamental administrative process in a manner compatible with the Planning, Management and Evaluation System (PME) approach articulated by the United States Office of Education. Planning is defined as that…
LANDSAT's role in state coastal management programs. [New Jersey and Texas
NASA Technical Reports Server (NTRS)
1979-01-01
The framework for state programs found in the Coastal Zone Management Act and examples of state opportunities to use LANDSAT are presented. Present activities suggest that LANDSAT remote sensing can be an efficient, effective tool for land use planning and coastal zone management.
15 CFR 923.47 - Designated State agency.
Code of Federal Regulations, 2011 CFR
2011-01-01
... MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Authorities and Organization § 923.47 Designated State... coordinate other State or local programs, plans and/or policies within the coastal zone; (ii) To what extent... management or regulatory authorities affecting the coastal zone presently are administered by the agency; and...
15 CFR 923.47 - Designated State agency.
Code of Federal Regulations, 2010 CFR
2010-01-01
... MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Authorities and Organization § 923.47 Designated State... coordinate other State or local programs, plans and/or policies within the coastal zone; (ii) To what extent... management or regulatory authorities affecting the coastal zone presently are administered by the agency; and...
Residuals Management and Water Pollution Control Planning.
ERIC Educational Resources Information Center
Environmental Protection Agency, Washington, DC. Office of Public Affairs.
This pamphlet addresses the problems associated with residuals and water quality especially as it relates to the National Water Pollution Control Program. The types of residuals and appropriate management systems are discussed. Additionally, one section is devoted to the role of citizen participation in developing management programs. (CS)
Decision Support Model for Municipal Solid Waste Management at Department of Defense Installations.
1995-12-01
Huang uses "Grey Dynamic Programming for Waste Management Planning Under Uncertainty." Fuzzy Dynamic Programming (FDP) is usually designed to...and Composting Programs. Washington: Island Press, 1991. Junio, D.F. Development of an Analytical Hierarchy Process ( AHP ) Model for Siting of
1997 SOUTH CAROLINA EPA/EPSCOR PROGRAM—STRATEGIC IMPROVEMENT PLAN (SIP) AND MANAGEMENT
The SIP of the 1997 South Carolina EPA/EPSCoR Program encompasses the educational programs and management components. The educational activities are addressed in terms of pre-college, undergraduate, graduate, and public science programs. These results are summarized bel...
Characterizing the Breadth and Depth of Volunteer Water Monitoring Programs in the United States.
Stepenuck, Kristine F; Genskow, Kenneth D
2018-01-01
A survey of 345 volunteer water monitoring programs in the United States was conducted to document their characteristics, and perceived level of support for data to inform natural resource management or policy decisions. The response rate of 86% provided information from 46 states. Programs represented a range of ages, budgets, objectives, scopes, and level of quality assurance, which influenced data uses and perceived support by sponsoring agency administrators and external decision makers. Most programs focused on rivers, streams, and lakes. Programs had not made substantial progress to develop EPA or state-approved quality assurance plans since 1998, with only 48% reporting such plans. Program coordinators reported feeling slightly more support for data to be used for management as compared to policy decisions. Programs with smaller budgets may be at particular risk of being perceived to lack credibility due to failure to develop quality assurance plans. Over half of programs identified as collaborative, in that volunteers assisted scientists in program design, data analysis and/or dissemination of results. Just under a third were contributory, in which volunteers primarily collected data in a scientist-defined program. Recommendations to improve perceived data credibility, and to augment limited budgets include developing quality assurance plans and gaining agency approval, and developing partnerships with other organizations conducting monitoring in the area to share resources and knowledge. Funding agencies should support development of quality assurance plans to help ensure data credibility. Service providers can aid in plan development by providing training to program staff over time to address high staff turnover rates.
Characterizing the Breadth and Depth of Volunteer Water Monitoring Programs in the United States
NASA Astrophysics Data System (ADS)
Stepenuck, Kristine F.; Genskow, Kenneth D.
2018-01-01
A survey of 345 volunteer water monitoring programs in the United States was conducted to document their characteristics, and perceived level of support for data to inform natural resource management or policy decisions. The response rate of 86% provided information from 46 states. Programs represented a range of ages, budgets, objectives, scopes, and level of quality assurance, which influenced data uses and perceived support by sponsoring agency administrators and external decision makers. Most programs focused on rivers, streams, and lakes. Programs had not made substantial progress to develop EPA or state-approved quality assurance plans since 1998, with only 48% reporting such plans. Program coordinators reported feeling slightly more support for data to be used for management as compared to policy decisions. Programs with smaller budgets may be at particular risk of being perceived to lack credibility due to failure to develop quality assurance plans. Over half of programs identified as collaborative, in that volunteers assisted scientists in program design, data analysis and/or dissemination of results. Just under a third were contributory, in which volunteers primarily collected data in a scientist-defined program. Recommendations to improve perceived data credibility, and to augment limited budgets include developing quality assurance plans and gaining agency approval, and developing partnerships with other organizations conducting monitoring in the area to share resources and knowledge. Funding agencies should support development of quality assurance plans to help ensure data credibility. Service providers can aid in plan development by providing training to program staff over time to address high staff turnover rates.
Preservation Planning Program. Study Report. Iowa State University Library. Final Report.
ERIC Educational Resources Information Center
Galejs, John; And Others
This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Iowa State University, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing plans and procedures for preserving…
Underground storage tank management plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-09-01
The Underground Storage Tank (UST) Program at the Oak Ridge Y-12 Plant was established to locate UST systems at the facility and to ensure that all operating UST systems are free of leaks. UST systems have been removed or upgraded in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance. With the closure of a significant portion of the USTs, the continuing mission of the UST Management Program is to manage the remaining active UST systems and continue corrective actions in a safe regulatory compliant manner. This Program outlines the compliance issues that must be addressed, reviewsmore » the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Program provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. The plan is divided into three major sections: (1) regulatory requirements, (2) active UST sites, and (3) out-of-service UST sites. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Program, and the procedures and guidance for compliance.« less
Implementation of a new advanced graduate education program in oral implantology.
Gallucci, German O; Weber, Hans Peter; Kalenderian, Elsbeth
2012-10-01
The academic program for the Harvard School of Dental Medicine's Advanced Graduate Program in Oral Implantology is based on scientific evidence applied to educational quality, translational research, patient care, and service. The objective of the program is to enable highly motivated individuals with proven scholarship and excellence in patient care to achieve academic leadership in the clinical and scientific fields of implant dentistry and tissue regeneration. A detailed curriculum describing the academic program, as well as a business plan (which included a management plan describing the organizational structure, financial implications, and market forces) and implementation and communication plans, were developed before moving forward. With careful academic and business planning, the result was a vibrant implant program, in which all placements and restorations of implants are coordinated with regard to practice management. The program is integrated into the existing clinical care model and has been financially self-sustaining from its inception. Six students have participated in the last two years. On average, each student performed seventy-nine procedures on twenty-nine patients, generating over $46,000 in production. The curriculum includes didactics, hands-on clinical learning, and research activities. Research is a critical component as well. The results demonstrate that the time taken to develop a detailed curriculum and business plan for a new academic program, which anticipated and resolved potential barriers to success, was instrumental in the successful implementation of an oral implantology residency program.
1980-04-01
much less con - cerned about malpractice problems. As a result of the program, they began to view the risk management program as their own and to recog...that con - tributes to better patient care. 131 Implementing Risk Management According to Donovan and Bader, an action plan for the systems approach might...Al87 344 DEVELOPMENT AND IMPLEMENTATION OF A COMPREHENSIVE RISK 1 MANAGEMENT PROGRAM AT THE USAF ACADEMY HOSPITAL(U) ARMY HEALTH CARE STUDIES AND
ERIC Educational Resources Information Center
Hanrin, Chanwit
2014-01-01
This research proposes (1) to develop the learning management plan for the Innovation and Information Technology in Education of the 3rd year students of the Bachelor of Education Program by using CIPPA effectively according to the criteria 75/75; (2) to study the effectiveness index of the learning management plan for the Innovation and…
ERIC Educational Resources Information Center
Brewer, Julie; And Others
1995-01-01
Presents three articles that discuss customer service in libraries, with a focus on planning for service management, a customer service program for library staff, and a quality improvement process. Highlights include developing and implementing service strategies, dealing with requests, redefining work relationships, coworkers as customers,…
45 CFR 205.36 - State plan requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., of an automated statewide management information system designed effectively and efficiently, to assist management in the administration of an approved AFDC State plan. The submission process to amend... aid or services is changed. (c) To electronically refer and exchange information with programs under...
15 CFR 923.56 - Plan coordination.
Code of Federal Regulations, 2014 CFR
2014-01-01
... OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Coordination, Public Involvement and National Interest § 923... interstate plans applicable to areas within the coastal zone— (1) Existing on January 1 of the year in which...
15 CFR 923.56 - Plan coordination.
Code of Federal Regulations, 2012 CFR
2012-01-01
... OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Coordination, Public Involvement and National Interest § 923... interstate plans applicable to areas within the coastal zone— (1) Existing on January 1 of the year in which...
15 CFR 923.56 - Plan coordination.
Code of Federal Regulations, 2010 CFR
2010-01-01
... OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Coordination, Public Involvement and National Interest § 923... interstate plans applicable to areas within the coastal zone— (1) Existing on January 1 of the year in which...
15 CFR 923.56 - Plan coordination.
Code of Federal Regulations, 2013 CFR
2013-01-01
... OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Coordination, Public Involvement and National Interest § 923... interstate plans applicable to areas within the coastal zone— (1) Existing on January 1 of the year in which...
15 CFR 923.56 - Plan coordination.
Code of Federal Regulations, 2011 CFR
2011-01-01
... OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Coordination, Public Involvement and National Interest § 923... interstate plans applicable to areas within the coastal zone— (1) Existing on January 1 of the year in which...
Information needs for natural fire management planning
Parsons, David; Bancroft, Larry; Nichols, Thomas; Stohlgren, Thomas
1985-01-01
The development and implementation of an effective natural fire management program require a clear definition of goals and objectives, an ever-expanding information base, and effective program evaluation. Examples are given from Sequoia and Kings Canyon National Parks.
Clean Air Act Section 112(r) Inspection Guidance Distribution Memorandum
This memorandum issues and makes immediately effective the document, Guidance for Conducting Risk Management Program Inspections under Clean Air Act Section 112(r), which supersedes the 1999 document on auditing risk management plans/programs.
ERIC Educational Resources Information Center
Pressley, Warren H., Jr.
In response to the great need for less than baccalaureate degree programs in Maine, a grant was made to finance the development of the three programs described here. Offered are a AA degree program in Hotel, Motel, and Restaurant Management, a program of inservice education in Respiratory Therapy which should serve as a model for programs in other…
Space Station Freedom operations planning
NASA Technical Reports Server (NTRS)
Accola, Anne L.; Keith, Bryant
1989-01-01
The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.
The Path to a Cure for Hepatitis C in People With HIV
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
77 FR 14482 - Petroleum Reduction and Alternative Fuel Consumption Requirements for Federal Fleets
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-12
... agencies to use this methodology to determine fleet inventory targets and to prepare fleet management plans.... Department of Energy, Office of Energy Efficiency and Renewable Energy, Federal Energy Management Program (EE... DOE receives will be made available on the Federal Energy Management Program's Federal Fleet...
Teaching Self-Management Strategies to Adolescents.
ERIC Educational Resources Information Center
Young, K. Richard; And Others
This book presents a behavioral program to teach adolescents basic self-management skills; two chapters provide the theoretical basis for the program and four chapters supply sample lesson plans. The first chapter is an introduction to behavioral self-management. It proposes a behavior change model with four major components: assessment,…
78 FR 4391 - New England Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-22
... current management system based on days-at-sea (DAS) and trip limits. These changes may include adoption of a DAS leasing program, and in that context, the NMFS Regional Office staff will give a presentation on the DAS leasing program adopted in the Northeast Multispecies Fishery Management Plan. The...
Timber management and use-value assessment
Paul E. Sendak; Neil K. Huyler
1994-01-01
Describes timber management activity and estimates timber harvest from forest land enrolled in Vermont's Use Value Appraisal (UVA) Forest Land property tax program. Data were compiled from the mandatory management plans and annual conformance reports filed for each property enrolled in the Program. Overall, 31 percent of the UVA properties reported a commercial...
Managing an "Organistically-Oriented" School Intervention Program.
ERIC Educational Resources Information Center
Barrilleaux, Louis E.; Schermerhorn, John R., Jr.
An "organic" relationship between change agents and clients is a well-popularized goal in recent literature on planned change and organization development. There is, however, a dearth of literature on how to manage change programs under parameters set by this organic value. This paper examines one school organization development program for the…
Chronology of a Successful Conversion--Contractor Revives School Lunch Program.
ERIC Educational Resources Information Center
Johnston, James B.
1994-01-01
A New York State school district employed a management company to privatize the food-service program with the goal of enticing all students to eat lunch. Expertise in marketing, menu planning, and food-service operation turned the program around. Suggests questions to ask when selecting a management company. (MLF)
Improving Program Performance through Management Information. A Workbook.
ERIC Educational Resources Information Center
Bienia, Nancy
Designed specifically for state and local managers and supervisors who plan, direct, and operate child support enforcement programs, this workbook provides a four-part, step-by-step process for identifying needed information and methods of using the information to operate an effective program. The process consists of: (1) determining what…
A Model Training Program: NJASBO's State Certification Program.
ERIC Educational Resources Information Center
Rodabaugh, Karl
1997-01-01
In 1991, the New Jersey Association of School Business Officials was selected as a nontraditional provider and asked to develop and implement a new state-approved certification program. The idea was to produce administrators who are adept at strategic planning, financial management and accounting, school law, personnel management, facility…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-03-01
The module explains the purpose of Section 112(r) of the Clean Air Act and how it relates to the goals and requirements of the Emergency Planning and Community Right-to-know Act (EPCRA). It describes the promulgation of the list of regulated substances. It discusses the risk management planning requirements and explains how the risk management rule is being promulgated. It identifies the presidential review and describes the similarity of the risk management program to the occupational health and safety administration`s process safety management standard.
Aircrew-aircraft integration: A summary of US Army research programs and plans
NASA Technical Reports Server (NTRS)
Key, D. L.; Aiken, E. W.
1984-01-01
A review of selected programs which illustrate the research efforts of the U.S. Army Aeromechanics Laboratory in the area of aircrew-aircraft integration is presented. Plans for research programs to support the development of future military rotorcraft are also described. The crew of a combat helicopter must, in general, perform two major functions during the conduct of a particular mission: flightpath control and mission management. Accordingly, the research programs described are being conducted in the same two major categories: (1) flightpath control, which encompasses the areas of handling qualities, stability and control, and displays for the pilot's control of the rotorcraft's flightpath, and (2) mission management, which includes human factors and cockpit integration research topics related to performance of navigation, communication, and aircraft systems management tasks.
Sue Miller; Theresa Jain; Mike A. Battaglia; Han-Sup Han; Russell T. Graham; Christopher R. Keyes; Jeremy S. Fried; Jonathan E. Sandquist
2014-01-01
Planning for hazardous fuels reduction can be challenging, given that land managers must balance multiple resource objectives. To help managers with planning and implementing fuel treatments, the Rocky Mountain Research Station, with support from the Joint Fire Science Program, has published A Comprehensive Guide to Fuel Management Practices for Dry Mixed Conifer...
SBA’s 7(j) Management Assistance Program: Changes Needed to Improve Efficiency and Effectiveness.
1981-09-29
Ctanges Needed;( im6 prove Efficiency nd Effectiveness. The Small Business Administration provides management and technical assistance to small busi ...Representatives This report, which was prepared pursuant to Public Law 95-507, discusses the Small Business Administration’s 7(j) Management Assistance...Program. The report discusses the need for better program planning and management and recommends that the Small Business Administration make a number of
Review: Optimization methods for groundwater modeling and management
NASA Astrophysics Data System (ADS)
Yeh, William W.-G.
2015-09-01
Optimization methods have been used in groundwater modeling as well as for the planning and management of groundwater systems. This paper reviews and evaluates the various optimization methods that have been used for solving the inverse problem of parameter identification (estimation), experimental design, and groundwater planning and management. Various model selection criteria are discussed, as well as criteria used for model discrimination. The inverse problem of parameter identification concerns the optimal determination of model parameters using water-level observations. In general, the optimal experimental design seeks to find sampling strategies for the purpose of estimating the unknown model parameters. A typical objective of optimal conjunctive-use planning of surface water and groundwater is to minimize the operational costs of meeting water demand. The optimization methods include mathematical programming techniques such as linear programming, quadratic programming, dynamic programming, stochastic programming, nonlinear programming, and the global search algorithms such as genetic algorithms, simulated annealing, and tabu search. Emphasis is placed on groundwater flow problems as opposed to contaminant transport problems. A typical two-dimensional groundwater flow problem is used to explain the basic formulations and algorithms that have been used to solve the formulated optimization problems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PLANNING ACQUISITION PLANNING Acquisition Plans 1407.102 Policy. DOI has implemented its acquisition planning system in 404 DM. This system meets the criteria prescribed in FAR Subpart 7.1, 375 DM, OCIO Program Management, and 376 DM, Automated Data Processing. Each of these addresses strategic planning for...
Code of Federal Regulations, 2011 CFR
2011-10-01
... PLANNING ACQUISITION PLANNING Acquisition Plans 1407.102 Policy. DOI has implemented its acquisition planning system in 404 DM. This system meets the criteria prescribed in FAR Subpart 7.1, 375 DM, OCIO Program Management, and 376 DM, Automated Data Processing. Each of these addresses strategic planning for...
NIF Operations Management Plan, August 2011
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Wonterghem, Bruno M.
Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in themore » laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the requirements, document flow down, organizational vision and mission, performance metrics, and interrelationship of the NIF Operations organization with other directorate and laboratory organizations. This document also provides a listing of roles and responsibilities, core processes, procedures, authority matrices, change control boards, and other information necessary for successfully functioning in the NIF Operations organization. This document, the NIF Shot Operations Plan, and the NIF Maintenance Plan together represent the primary documents satisfying our Conduct of Operations compliance requirement.« less
NASA Astrophysics Data System (ADS)
1981-12-01
The planning procedures for the energy program and policy guidelines for energy planning are presented. Future changes in marginal costs and directions indicated for economically efficient pricing are assessed. The aim of the conservation program is to close the gap between the amounts of conservation which is rationally cost effective and that projected to occur anyway through normal market forces. An overview of energy demand and proposed plans for energy supply are given. Liquid fuels have priority although work on coal receives new emphasis. A better program on energy demand and management is suggested.
NASA Astrophysics Data System (ADS)
Arevalo, S.; Atwood, C.; Bell, P.; Blacker, T. D.; Dey, S.; Fisher, D.; Fisher, D. A.; Genalis, P.; Gorski, J.; Harris, A.; Hill, K.; Hurwitz, M.; Kendall, R. P.; Meakin, R. L.; Morton, S.; Moyer, E. T.; Post, D. E.; Strawn, R.; Veldhuizen, D. v.; Votta, L. G.; Wynn, S.; Zelinski, G.
2008-07-01
In FY2008, the U.S. Department of Defense (DoD) initiated the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program, a 360M program with a two-year planning phase and a ten-year execution phase. CREATE will develop and deploy three computational engineering tool sets for DoD acquisition programs to use to design aircraft, ships and radio-frequency antennas. The planning and execution of CREATE are based on the 'lessons learned' from case studies of large-scale computational science and engineering projects. The case studies stress the importance of a stable, close-knit development team; a focus on customer needs and requirements; verification and validation; flexible and agile planning, management, and development processes; risk management; realistic schedules and resource levels; balanced short- and long-term goals and deliverables; and stable, long-term support by the program sponsor. Since it began in FY2008, the CREATE program has built a team and project structure, developed requirements and begun validating them, identified candidate products, established initial connections with the acquisition programs, begun detailed project planning and development, and generated the initial collaboration infrastructure necessary for success by its multi-institutional, multidisciplinary teams.
2014-01-01
Background Systematic planning could improve the generally moderate effectiveness of interventions to enhance adherence to clinical practice guidelines. The aim of our study was to demonstrate how the process of Intervention Mapping was used to develop an intervention to address the lack of adherence to the national CPG for low back pain by Dutch physical therapists. Methods We systematically developed a program to improve adherence to the Dutch physical therapy guidelines for low back pain. Based on multi-method formative research, we formulated program and change objectives. Selected theory-based methods of change and practical applications were combined into an intervention program. Implementation and evaluation plans were developed. Results Formative research revealed influential determinants for physical therapists and practice quality managers. Self-regulation was appropriate because both the physical therapists and the practice managers needed to monitor current practice and make and implement plans for change. The program stimulated interaction between practice levels by emphasizing collective goal setting. It combined practical applications, such as knowledge transfer and discussion-and-feedback, based on theory-based methods, such as consciousness raising and active learning. The implementation plan incorporated the wider environment. The evaluation plan included an effect and process evaluation. Conclusions Intervention Mapping is a useful framework for formative data in program planning in the field of clinical guideline implementation. However, a decision aid to select determinants of guideline adherence identified in the formative research to analyse the problem may increase the efficiency of the application of the Intervention Mapping process. PMID:24428945
Rutten, Geert M; Harting, Janneke; Bartholomew, Leona K; Braspenning, Jozé C; van Dolder, Rob; Heijmans, Marcel Fgj; Hendriks, Erik Jm; Kremers, Stef Pj; van Peppen, Roland Ps; Rutten, Steven Tj; Schlief, Angelique; de Vries, Nanne K; Oostendorp, Rob Ab
2014-01-15
Systematic planning could improve the generally moderate effectiveness of interventions to enhance adherence to clinical practice guidelines. The aim of our study was to demonstrate how the process of Intervention Mapping was used to develop an intervention to address the lack of adherence to the national CPG for low back pain by Dutch physical therapists. We systematically developed a program to improve adherence to the Dutch physical therapy guidelines for low back pain. Based on multi-method formative research, we formulated program and change objectives. Selected theory-based methods of change and practical applications were combined into an intervention program. Implementation and evaluation plans were developed. Formative research revealed influential determinants for physical therapists and practice quality managers. Self-regulation was appropriate because both the physical therapists and the practice managers needed to monitor current practice and make and implement plans for change. The program stimulated interaction between practice levels by emphasizing collective goal setting. It combined practical applications, such as knowledge transfer and discussion-and-feedback, based on theory-based methods, such as consciousness raising and active learning. The implementation plan incorporated the wider environment. The evaluation plan included an effect and process evaluation. Intervention Mapping is a useful framework for formative data in program planning in the field of clinical guideline implementation. However, a decision aid to select determinants of guideline adherence identified in the formative research to analyse the problem may increase the efficiency of the application of the Intervention Mapping process.
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations : for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and E...
Code of Federal Regulations, 2011 CFR
2011-07-01
... ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants (section 205(j)(2)) § 35.412... State's construction grant allotment as determined by Congress for Water Quality Management Planning...)(4) regarding reserves from State allotments under Title VI of the Clean Water Act for section 205(j...
SCHOOL PLANT MANAGEMENT FOR SCHOOL ADMINISTRATORS.
ERIC Educational Resources Information Center
ENGMAN, JOHN DAVID
THIS REPORT IS A COMPILATION OF STUDIES ON SIGNIFICANT ASPECTS IN SCHOOL PLANNING AND OPERATION. A RELATIONSHIP IS SHOWN BETWEEN CURRICULUM, PERSONNEL AND AUXILIARY SERVICES IN EDUCATIONAL PROGRAM OPERATIONS. THE REPORT INCLUDES PLANNING, MANAGEMENT AND OPERATION OF SUCH AREAS AS--NONINSTRUCTIONAL PERSONNEL POLICIES, CUSTODIAL SERVICES,…
When Violence Threatens the Campus Workplace.
ERIC Educational Resources Information Center
Willits, Bob
1994-01-01
A combination of economic and societal stresses contributes to workplace violence in higher education. College human resources professionals must become knowledgeable about its causes, implications, prevention, and appropriate responses. A three-tiered plan includes a preventive program, threat-management plan and team, and crisis management team.…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for automotive body repair I and II. Presented first are a program…