ISS Payload Operations: The Need for and Benefit of Responsive Planning
NASA Technical Reports Server (NTRS)
Nahay, Ed; Boster, Mandee
2000-01-01
International Space Station (ISS) payload operations are controlled through implementation of a payload operations plan. This plan, which represents the defined approach to payload operations in general, can vary in terms of level of definition. The detailed plan provides the specific sequence and timing of each component of a payload's operations. Such an approach to planning was implemented in the Spacelab program. The responsive plan provides a flexible approach to payload operations through generalization. A responsive approach to planning was implemented in the NASA/Mir Phase 1 program, and was identified as a need during the Skylab program. The current approach to ISS payload operations planning and control tends toward detailed planning, rather than responsive planning. The use of detailed plans provides for the efficient use of limited resources onboard the ISS. It restricts flexibility in payload operations, which is inconsistent with the dynamic nature of the ISS science program, and it restricts crew desires for flexibility and autonomy. Also, detailed planning is manpower intensive. The development and implementation of a responsive plan provides for a more dynamic, more accommodating, and less manpower intensive approach to planning. The science program becomes more dynamic and responsive as the plan provides flexibility to accommodate real-time science accomplishments. Communications limitations and the crew desire for flexibility and autonomy in plan implementation are readily accommodated with responsive planning. Manpower efficiencies are accomplished through a reduction in requirements collection and coordination, plan development, and maintenance. Through examples and assessments, this paper identifies the need to transition from detailed to responsive plans for ISS payload operations. Examples depict specific characteristics of the plans. Assessments identify the following: the means by which responsive plans accommodate the dynamic nature of science programs and the crew desire for flexibility; the means by which responsive plans readily accommodate ISS communications constraints; manpower efficiencies to be achieved through use of responsive plans; and the implications of responsive planning relative to resource utilization efficiency.
NASA Technical Reports Server (NTRS)
Dunbar, J. C.
1972-01-01
The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.
SDDOT transportation systems management & operations program plan.
DOT National Transportation Integrated Search
2016-06-01
The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...
Modular space station, phase B extension. Program operations plan
NASA Technical Reports Server (NTRS)
1971-01-01
An organized approach is defined for establishing the most significant requirements pertaining to mission operations, information management, and computer program design and development for the modular space station program. The operations plan pertains to the space station and experiment module program elements and to the ground elements required for mission management and mission support operations.
San Diego transit five year plan update : FY 1982-1986
DOT National Transportation Integrated Search
1981-07-01
The Five Year Plan Update constitutes the annual revision to the operating plan and capital program for the following five year planning period, presents its adopted budget and a specific operating plan and capital program for FY 1982 as well as less...
49 CFR 266.3 - Rail Service Assistance Program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... construction assistance; (6) Planning assistance; and (7) Program operations assistance. (b) Special limitations on planning assistance and program operation assistance. (1) A State is eligible to receive up to $100,000, or 5 percent of its entitlement, whichever is greater, as planning assistance; and (2) A...
Space Station Freedom operations planning
NASA Technical Reports Server (NTRS)
Accola, Anne L.; Keith, Bryant
1989-01-01
The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Can my operations plan, drilling permit... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.16 Can my operations plan, drilling permit, and drilling program apply to more than one well? (a) Your...
NASA Technical Reports Server (NTRS)
1975-01-01
Summaries are presented of Research and Technology Operating Plans currently in progress throughout NASA. Citations and abstracts of the operating plans are presented along with a subject index, technical monitor index, and responsible NASA organization index. Research programs presented include those carried out in the Office of Aeronautics and Space Technology, Office of Energy Programs, Office of Applications, Office of Space Sciences, Office of Tracking and Data Acquisition, and the Office of Manned Space Flight.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-13
... to protect CO-OP members against insurance industry involvement and interference. To ensure consumer... Protection and Affordable Care Act; Establishment of Consumer Operated and Oriented Plan (CO-OP) Program... the Consumer Operated and Oriented Plan (CO-OP) program, which provides loans to foster the creation...
20 CFR 631.40 - State program operational plan.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false State program operational plan. 631.40 Section 631.40 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROGRAMS... Federal-State Unemployment Compensation System, the Trade Adjustment Assistance Program, the State...
10 CFR 436.102 - General operations plan format and content.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false General operations plan format and content. 436.102... PROGRAMS Guidelines for General Operations Plans § 436.102 General operations plan format and content. (a... effective date of these guidelines, a general operations 10-year plan which shall consist of two parts, an...
20 CFR 632.255 - Program planning.
Code of Federal Regulations, 2010 CFR
2010-04-01
... that may be characterized as planning and design but not program operation. (c) Expenses incurred in... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program planning. 632.255 Section 632.255... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a...
Phase C/D program development plan. Volume 1: Program plan
NASA Technical Reports Server (NTRS)
1971-01-01
The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.
23 CFR 450.332 - Annual listing of obligated projects.
Code of Federal Regulations, 2010 CFR
2010-04-01
... calendar days following the end of the program year, the State, public transportation operator(s), and the... 450.332 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332 Annual...
10 CFR 436.2 - General objectives.
Code of Federal Regulations, 2010 CFR
2010-01-01
... OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS § 436.2 General objectives. The objectives of Federal energy management and planning programs are: (a) To apply energy... use of energy in all agency operations through general operations plans. [55 FR 48220, Nov. 20, 1990...
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
23 CFR 450.208 - Coordination of planning process activities.
Code of Federal Regulations, 2013 CFR
2013-04-01
... RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.208... transportation operators to support statewide transportation planning and programming priorities and decisions...
23 CFR 450.208 - Coordination of planning process activities.
Code of Federal Regulations, 2014 CFR
2014-04-01
... RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.208... transportation operators to support statewide transportation planning and programming priorities and decisions...
23 CFR 450.208 - Coordination of planning process activities.
Code of Federal Regulations, 2012 CFR
2012-04-01
... RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.208... transportation operators to support statewide transportation planning and programming priorities and decisions...
Hall, Stacey A; Allen, Brandon L; Phillips, Dennis
2016-01-01
College athletic departments have a responsibility to provide a safe environment for student-athletes; however, most colleges do not have a crisis management plan that includes procedures for displaced student-athletes or alternate facilities to perform athletic events. Continuity of operations planning ensures athletic programs are equipped to maintain essential functions during, or shortly after, a disruption of operations due to possible hazards. Previous studies have identified a lack of emergency preparedness and continuity planning in college athletic departments. The purpose of this article is to illustrate in detail one approach to disaster planning for college athletic departments, namely the Federal Emergency Management Agency (FEMA) continuity of operations framework. By adhering to FEMA guidelines and promoting a best practices model, athletic programs can effectively plan to address potential hazards, as well as protect the organization's brand, image, and financial sustainability after a crisis event.
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
77 FR 77117 - Proposed Revision 0 on Access Authorization-Operational Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-31
...--Operational Program AGENCY: Nuclear Regulatory Commission. ACTION: Standard review plan-draft section revision... public comment on NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for... seeks comments on the new Section 13.6.4 of the Standard Review Plan (SRP) concerning implementation of...
Primary Immune Deficiency Diseases
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
Wiskott-Aldrich Syndrome (WAS)
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
Respiratory Syncytial Virus (RSV): Treatment
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
Evaluation of the Implementation of Operations and Maintenance Programs in New Jersey Schools.
ERIC Educational Resources Information Center
Kominsky, John R.; Freyberg, Ronald W.; Gerber, Donald R.; Centifonti, Gary J.
All schools are required to develop and implement an asbestos management plan (AMP). The key component of this plan is each school's operations and maintenance (O&M) program. This report outlines the importance of such programs. It describes an O&M program as an administrative framework that prescribes specific activities and work…
ERIC Educational Resources Information Center
Center for Occupational Research and Development, Inc., Waco, TX.
This program planning guide for a two-year postsecondary nuclear reactor (plant) operator trainee program is designed for use with courses 1-16 of thirty-five in the Nuclear Technology Series. The purpose of the guide is to describe the nuclear power field and its job categories for specialists, technicians and operators; and to assist planners,…
Space Station - An integrated approach to operational logistics support
NASA Technical Reports Server (NTRS)
Hosmer, G. J.
1986-01-01
Development of an efficient and cost effective operational logistics system for the Space Station will require logistics planning early in the program's design and development phase. This paper will focus on Integrated Logistics Support (ILS) Program techniques and their application to the Space Station program design, production and deployment phases to assure the development of an effective and cost efficient operational logistics system. The paper will provide the methodology and time-phased programmatic steps required to establish a Space Station ILS Program that will provide an operational logistics system based on planned Space Station program logistics support.
National Institute of Allergy and Infectious Diseases
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
Warts, Hypogammaglobulinemia, Infections, and Myelokathexis Syndrome (WHIMS)
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
Types of HIV/AIDS Antiretroviral Drugs
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
13 CFR 108.2005 - Contents of plan submitted by SSBICs.
Code of Federal Regulations, 2010 CFR
2010-01-01
... MARKETS VENTURE CAPITAL (âNMVCâ) PROGRAM Requirements and Procedures for Operational Assistance Grants to... Operational Assistance. The SSBIC must describe how it plans to use its grant funds to provide Operational... types of Operational Assistance it proposes to provide, and how it plans to provide the Operational...
Hyper-Immunoglobulin E Syndrome (HIES) or Job's Syndrome
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
NASA Technical Reports Server (NTRS)
1979-01-01
A plan is presented for the evolutionary development and deployment of the power module system with performance capabilities required to support the 1983 to 1990 user requirements. Aspects summarized include program functional, operational, and hardware elements; program work breakdown and specification items; development plans and schedules for developmental and technology milestones; test concepts and timeliness; and ground and orbit operations concepts.
Solar power satellite system definition study, phase 2. Part 1: Midterm briefing
NASA Technical Reports Server (NTRS)
1979-01-01
An overview of the program plan for the Solar Power Satellite Program is given. Progress in the microwave power transmission system is reported. A description is given of the following: (1) launch and recovery site facilities, systems and operations; (2) cargo packaging; (3) earth-to-LEO cargo transportation operations; (4) LEO-to-GEO cargo transportation operations; (5) personnel transportation operations; (6) space vehicles in-space maintenance operations; and (7) SPS maintenance systems and operations. Other topics discussed include GEO base operations, satellite construction operations, intra-base logistics, and GEO base definition. A research and program plan is presented along with cost estimates.
30 CFR 75.161 - Plans for training programs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Plans for training programs. 75.161 Section 75... Provision] § 75.161 Plans for training programs. Each operator must submit to the district manager, of the Coal Mine Safety and Health District in which the mine is located, a program or plan setting forth what...
34 CFR 200.27 - Development of a schoolwide program plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...
34 CFR 200.27 - Development of a schoolwide program plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...
34 CFR 200.27 - Development of a schoolwide program plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...
34 CFR 200.27 - Development of a schoolwide program plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...
Influence of PPB on Capital Budgeting.
ERIC Educational Resources Information Center
Ellis, Arthur E.
This talk is divided into two parts: Part one covers Planning, Programming and Budgeting for Capital Programs. Part two is a brief description of the Coho Salmon Program and how Program Planning and Budgeting in both the operation program and the capital phase was used to develop the Salmon Fishing Industry in Michigan. The planning process…
Tug fleet and ground operations schedules and controls. Volume 2: part 1
NASA Technical Reports Server (NTRS)
1975-01-01
This Tug Fleet and Ground Operations Schedules and Controls Study addresses both ground operational data and technical requirements that span the Tug planning phase and operations phase. A similar study covering mission operations (by others) provides the complimentary flight operations details. The two studies provide the planning data requirements, resource allocation, and control milestones for supporting the requirements of the STS program. This Tug Fleet and Ground Operations Schedules and Controls Study incorporates the basic ground operations requirements and concepts provided by previous studies with the interrelationships of the planning, IUS transition, and Tug fleet operations phases. The interrelationships of these phases were studied as a system to optimize overall program benefits and minimize operational risk factors.
25 CFR 170.402 - What is the tribal role in transportation planning?
Code of Federal Regulations, 2010 CFR
2010-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... transportation related meetings; (9) Performing transportation planning for operational and maintenance...
The Path to a Cure for Hepatitis C in People With HIV
... of the Director Office of the Chief Science Management & Operations Administrative Services Office of Biodefense Research & Surety Communications ... Office of Clinical Research Policy and Regulatory Planning Operations Support Program Planning Analysis ... Office of Acquisitions Scientific Review Program Division ...
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for machine tool operation/machine shop I and II. Presented first are a…
76 FR 19683 - Conservation Program Recipient Reporting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-08
... regulation that has application or plan due dates after October 1, 2010. The Watershed Operations and Flood Prevention Program, Emergency Watersheds Protection Program, Healthy Forests Reserve Program, Agricultural Management Assistance Program, and the Conservation Stewardship Program have application or plan due dates...
Biomedical programs operations plans
NASA Technical Reports Server (NTRS)
Walbrecher, H. F.
1974-01-01
Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations : for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and E...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Can my operations plan, drilling permit, and drilling program apply to more than one well? 3261.16 Section 3261.16 Public Lands: Interior... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.16 Can...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Can my operations plan, drilling permit, and drilling program apply to more than one well? 3261.16 Section 3261.16 Public Lands: Interior... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.16 Can...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Can my operations plan, drilling permit, and drilling program apply to more than one well? 3261.16 Section 3261.16 Public Lands: Interior... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.16 Can...
2016-12-22
This final rule sets forth payment parameters and provisions related to the risk adjustment program; cost-sharing parameters and cost-sharing reductions; and user fees for Federally-facilitated Exchanges and State-based Exchanges on the Federal platform. It also provides additional guidance relating to standardized options; qualified health plans; consumer assistance tools; network adequacy; the Small Business Health Options Programs; stand-alone dental plans; fair health insurance premiums; guaranteed availability and guaranteed renewability; the medical loss ratio program; eligibility and enrollment; appeals; consumer-operated and oriented plans; special enrollment periods; and other related topics.
40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... may come from plans you developed for other purposes such as a Standard Operating Procedure manual or... source is operational. The SSM plan provides detailed procedures for operating and maintaining your...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... may come from plans you developed for other purposes such as a Standard Operating Procedure manual or... source is operational. The SSM plan provides detailed procedures for operating and maintaining your...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
INDOT Technical Training Plan : Appendix B
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix M
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix P
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix F
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix H
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix E
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix O
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix J
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix L
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix A
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix D
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix K
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix G
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix I
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix N
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix C
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.; McNair, Ann R. (Technical Monitor)
2002-01-01
The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.
2002-01-01
The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.
Planning for Impact: A Guide to Planning Effective Family Program.
ERIC Educational Resources Information Center
Hardy, James M.
A document intended to provide program planning guidelines for Young Men's Christian Associations (YMCAs) desirous of working with families, recommends adherence to eight principles and following of five steps. The principles involve planning before action, fact finding and analysis, clear delineation of operational objectives, planning at all…
Quality-assurance plan for water-resources activities of the U.S. Geological Survey in Idaho
Packard, F.A.
1996-01-01
To ensure continued confidence in its products, the Water Resources Division of the U.S. Geological Survey implemented a policy that all its scientific work be performed in accordance with a centrally managed quality-assurance program. This report establishes and documents a formal policy for current (1995) quality assurance within the Idaho District of the U.S. Geological Survey. Quality assurance is formalized by describing district organization and operational responsibilities, documenting the district quality-assurance policies, and describing district functions. The districts conducts its work through offices in Boise, Idaho Falls, Twin Falls, Sandpoint, and at the Idaho National Engineering Laboratory. Data-collection programs and interpretive studies are conducted by two operating units, and operational and technical assistance is provided by three support units: (1) Administrative Services advisors provide guidance on various personnel issues and budget functions, (2) computer and reports advisors provide guidance in their fields, and (3) discipline specialists provide technical advice and assistance to the district and to chiefs of various projects. The district's quality-assurance plan is based on an overall policy that provides a framework for defining the precision and accuracy of collected data. The plan is supported by a series of quality-assurance policy statements that describe responsibilities for specific operations in the district's program. The operations are program planning; project planning; project implementation; review and remediation; data collection; equipment calibration and maintenance; data processing and storage; data analysis, synthesis, and interpretation; report preparation and processing; and training. Activities of the district are systematically conducted under a hierarchy of supervision an management that is designed to ensure conformance with Water Resources Division goals quality assurance. The district quality-assurance plan does not describe detailed technical activities that are commonly termed "quality-control procedures." Instead, it focuses on current policies, operations, and responsibilities that are implemented at the management level. Contents of the plan will be reviewed annually and updated as programs and operations change.
40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... the procedures may come from plans you developed for other purposes such as a Standard Operating... as long as the source is operational. The SSM plan provides detailed procedures for operating and...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... the procedures may come from plans you developed for other purposes such as a Standard Operating... as long as the source is operational. The SSM plan provides detailed procedures for operating and...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... the procedures may come from plans you developed for other purposes such as a Standard Operating... as long as the source is operational. The SSM plan provides detailed procedures for operating and...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-02
...This document is a request for comments regarding the provisions of section 1322 of the Patient Protection and Affordable Care Act (the Affordable Care Act), enacted on March 23, 2010, which requires the Secretary to establish the Consumer Operated and Oriented Plan program. The Secretary of Health and Human Services invites public comments in advance of future rulemaking and grant and loan solicitations.
NASA Technical Reports Server (NTRS)
Bjorn, L. C.; Martin, M. L.; Murphy, C. W.; Niebla, J. F., V
1971-01-01
This document defines the facilities, equipment, and operational plans required to support the MSS Program at KSC. Included is an analysis of KSC operations, a definition of flow plans, facility utilization and modifications, test plans and concepts, activation, and tradeoff studies. Existing GSE and facilities that have a potential utilization are identified, and new items are defined where possible. The study concludes that the existing facilities are suitable for use in the space station program without major modification from the Saturn-Apollo configuration.
Code of Federal Regulations, 2010 CFR
2010-07-01
... RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.1 Scope. This part... mining operations and reclamation plans portions of applications for permits for underground mining...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-29
..., published on March 22, 2012, that approved revisions to the Puerto Rico Regulations for the Control of Atmospheric Pollution. Those revisions were submitted to EPA by the Puerto Rico Environmental Quality Board on...] Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of Puerto...
Training Program for Operation of Emergency Vehicles. Instructor Lesson Plans.
ERIC Educational Resources Information Center
INNOVATRIX, Inc., Ingomar, PA.
Unit lesson plans for the three parts of the Emergency Vehicle (EV) Operator training program are provided. The units in parts 1 and 2 are designed for use in a classroom setting and contain the following components: description of the unit; trainees' knowledge objectives; instructor preparation activities; instructional content/presentation…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-05
... groundfish sector to request exemptions from Federal fishing regulations through its annual operations plan... rule implementing the annual sector operations plans. However, sectors can request exemptions at any...-funded at-sea monitoring program will be required to develop a monitoring plan as part of its operation...
75 FR 35816 - Establishment of the Consumer Operated and Oriented Plan (CO-OP) Advisory Board
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-23
... (CO-OP) Advisory Board AGENCY: Department of Health and Human Services, Office of Consumer Information & Insurance Oversight. ACTION: Federal Register Notice. Authority: The Consumer Operated and Oriented Plan (CO... (PPACA) that calls for the establishment of the Consumer Operated and Oriented Plans (CO-OP) Program...
Operational Planning for Multiple Heterogeneous Unmanned Aerial Vehicles in Three Dimensions
2009-06-01
human input in the planning process. Two solution methods are presented: (1) a mixed-integer program, and (2) an algorithm that utilizes a metaheuristic ...and (2) an algorithm that utilizes a metaheuristic to generate composite variables for a linear program, called the Composite Operations Planning...that represent a path and an associated type of UAV. The reformulation is incorporated into an algorithm that uses a metaheuristic to generate the
40 CFR 68.180 - Emergency response program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...
40 CFR 68.180 - Emergency response program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...
40 CFR 68.180 - Emergency response program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...
40 CFR 68.180 - Emergency response program.
Code of Federal Regulations, 2014 CFR
2014-07-01
... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...
Advanced space program studies. Overall executive summary
NASA Technical Reports Server (NTRS)
Wolfe, M. G.
1977-01-01
NASA and DoD requirements and planning data were used in multidiscipline advanced planning investigations of space operations and associated elements (including man), identification of potential low cost approaches, vehicle design, cost synthesis techniques, technology forecasting and opportunities for DoD technology transfer, and the development near-, mid-, and far-term space initiatives and development plans with emphasis on domestic and military commonality. An overview of objectives and results are presented for the following studies: advanced space planning and conceptual analysis, shuttle users, technology assessment and new opportunities, standardization and program practice, integrated STS operations planning, solid spinning upper stage, and integrated planning support functions.
A Technology Plan for Enabling Commercial Space Business
NASA Technical Reports Server (NTRS)
Lyles, Garry M.
1997-01-01
The National Aeronautics and Space Administration's (NASA) Advanced Space Transportation Program is a customer driven, focused technology program that supports the NASA Strategic Plan and considers future commercial space business projections. The initial cycle of the Advanced Space Transportation Program implementation planning was conducted from December 1995 through February 1996 and represented increased NASA emphasis on broad base technology development with the goal of dramatic reductions in the cost of space transportation. The second planning cycle, conducted in January and February 1997, updated the program implementation plan based on changes in the external environment, increased maturity of advanced concept studies, and current technology assessments. The program has taken a business-like approach to technology development with a balanced portfolio of near, medium, and long-term strategic targets. Strategic targets are influenced by Earth science, space science, and exploration objectives as well as commercial space markets. Commercial space markets include those that would be enhanced by lower cost transportation as well as potential markets resulting in major increases in space business induced by reductions in transportation cost. The program plan addresses earth-to-orbit space launch, earth orbit operations and deep space systems. It also addresses all critical transportation system elements; including structures, thermal protection systems, propulsion, avionics, and operations. As these technologies are matured, integrated technology flight experiments such as the X-33 and X-34 flight demonstrator programs support near-term (one to five years) development or operational decisions. The Advanced Space Transportation Program and the flight demonstrator programs combine business planning, ground-based technology demonstrations and flight demonstrations that will permit industry and NASA to commit to revolutionary new space transportation systems beginning at the turn of the century and continuing far into the future.
Autonomous Vehicle Mission Planning Using AI (Artificial Intelligence) Techniques.
1985-12-01
it uses are declarative patterns that encode facts about how goals may give rise to - . plans. The program processes a story a sentence at a time...the planning process. By separating the knowledge about how to plan from the specific domain knowledge, an understander can use this knowledge about how ...path planning program developed in a previous thesis effort will be incorporated into the overall program in order to demonstrate the operating system
Site scientific mission plan for the Southern Great Plains CART site, January-June 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schneider, J.M.; Lamb, P.J.; Sisterson, D.L.
1994-12-01
The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on January 1, 1995, and also looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Experiment Support Team [EST], Operations Team, Data Management Teammore » [DMT], Instrument Team [IT], and Campaign Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary envisaged site activities, together with information concerning approved and proposed Intensive Observation Periods (IOPs). Amendments will be prepared and distributed whenever the content changes by more than 30% within a six-month period. The primary users of this document are the site operator, the site scientist, the Science Team through the ARM Program Science Director, The ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that will be updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.« less
Louisiana CVO/ITS business plan
DOT National Transportation Integrated Search
1998-06-01
Louisianas CVO / ITS Business Plan provides a long-term strategic vision and implementation program for meeting Louisianas Commercial Vehicle Operations / Intelligent Transportation Systems (CVO / ITS) needs. Commercial Vehicle Operations - CVO...
ERIC Educational Resources Information Center
Sevier, Robert A.
1989-01-01
A guide to developing a college marketing plan defines key marketing terms, outlines the development of a plan (including institutional analysis, market research, strategy formation and execution, and program evaluation), and provides a list of important principles with which to operate a program. (MSE)
30 CFR 780.10 - Information collection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.10... activities, including a requirement that the application include an operation and reclamation plan. The...
14 CFR 120.115 - Employee Assistance Program (EAP).
Code of Federal Regulations, 2012 CFR
2012-01-01
... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.115 Employee Assistance Program (EAP). (a... employer's drug testing plan submitted to the FAA for approval. ...
14 CFR 120.115 - Employee Assistance Program (EAP).
Code of Federal Regulations, 2011 CFR
2011-01-01
... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.115 Employee Assistance Program (EAP). (a... employer's drug testing plan submitted to the FAA for approval. ...
14 CFR 120.115 - Employee Assistance Program (EAP).
Code of Federal Regulations, 2013 CFR
2013-01-01
... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.115 Employee Assistance Program (EAP). (a... employer's drug testing plan submitted to the FAA for approval. ...
14 CFR 120.115 - Employee Assistance Program (EAP).
Code of Federal Regulations, 2010 CFR
2010-01-01
... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.115 Employee Assistance Program (EAP). (a... employer's drug testing plan submitted to the FAA for approval. ...
Web Application Software for Ground Operations Planning Database (GOPDb) Management
NASA Technical Reports Server (NTRS)
Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey
2013-01-01
A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.
NIF Operations Management Plan, August 2011
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Wonterghem, Bruno M.
Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in themore » laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the requirements, document flow down, organizational vision and mission, performance metrics, and interrelationship of the NIF Operations organization with other directorate and laboratory organizations. This document also provides a listing of roles and responsibilities, core processes, procedures, authority matrices, change control boards, and other information necessary for successfully functioning in the NIF Operations organization. This document, the NIF Shot Operations Plan, and the NIF Maintenance Plan together represent the primary documents satisfying our Conduct of Operations compliance requirement.« less
strategic scenario planning and analysis Program portfolio analysis Program management, planning and strategic execution Change management and operational improvement Research Interests Bioenergy supply chains management, organizational improvement, and program and project management. Prior Work Experience Consultant
23 CFR 450.308 - Funding for transportation planning and unified planning work programs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... MPO, in cooperation with the State(s) and public transportation operator(s), shall develop a UPWP that... cooperation with the State(s) and the public transportation operator(s), in lieu of a UPWP. A simplified...- or two-year period, who (e.g., State, MPO, public transportation operator, local government, or...
Code of Federal Regulations, 2010 CFR
2010-07-01
... RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.1 Scope. This part provides the... operations and reclamation plan portions of applications for permits for surface mining activities, except to...
40 CFR 63.1347 - Operation and maintenance plan requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants From the Portland Cement Manufacturing Industry Emission Standards and Operating Limits § 63.1347 Operation and maintenance plan requirements. (a...
40 CFR 63.1347 - Operation and maintenance plan requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants From the Portland Cement Manufacturing Industry Emission Standards and Operating Limits § 63.1347 Operation and maintenance plan requirements. (a...
Study of solid rocket motor for space shuttle booster, Volume 3: Program acquisition planning
NASA Technical Reports Server (NTRS)
1972-01-01
The program planning acquisition functions for the development of the solid propellant rocket engine for the space shuttle booster is presented. The subjects discussed are: (1) program management, (2) contracts administration, (3) systems engineering, (4) configuration management, and (5) maintenance engineering. The plans for manufacturing, testing, and operations support are included.
ERIC Educational Resources Information Center
State Univ. of New York, Buffalo. Western New York School Study Council.
Although the public is best served by governmental agencies which have integrated the major functions of planning, managing, and budgeting, it can be asserted that the planning function is paramount. A review of the evolution of public agency administration in the U.S. reveals that until recent years the planning function has been largely…
30 CFR 784.20 - Subsidence control plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.20... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Subsidence control plan. 784.20 Section 784.20...
Projecting Program Cost Over an Adequate Time Horizon.
ERIC Educational Resources Information Center
Spencer, Milton
Planning Programming Budgeting Systems involve the introduction of three major operational concepts. First, the development of an analytical capability to examine in depth both agency objectives and the various programs to meet these objectives. Second, the formation of a five-year planning and programming process combined with a sophisticated…
40 CFR 63.1347 - Operation and maintenance plan requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants From the Portland Cement Manufacturing Industry Emission Standards and Operating Limits § 63.1347 Operation and maintenance plan requirements. (a) You must...
40 CFR 63.1347 - Operation and maintenance plan requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants From the Portland Cement Manufacturing Industry Emission Standards and Operating Limits § 63.1347 Operation and maintenance plan requirements. (a) You must...
39 CFR 3.7 - Information furnished to Board-program review.
Code of Federal Regulations, 2010 CFR
2010-07-01
... visibility or the operating budget (including increases in expense amounts) or the capital investment budget...; (2) Five-year plans, annual operating and investment plans, and significant departures from estimates...
Planning for organization development in operations control centers.
DOT National Transportation Integrated Search
2012-06-01
The first step in a proposed program of organization development (OD) was to assess organizational processes within the : Technical Operations Services (TechOps) Operations Control Centers (OCCs). The aim of the OD program was to : improve effectiven...
7 CFR 636.8 - WHIP plan of operations.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING WILDLIFE HABITAT INCENTIVE PROGRAM § 636.8 WHIP plan of... plan of operations encompasses the parcel of land where habitat will be established, improved... one of the following as determined by NRCS: (1) Fish and wildlife habitat conditions that are of...
7 CFR 636.8 - WHIP plan of operations.
Code of Federal Regulations, 2013 CFR
2013-01-01
..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING WILDLIFE HABITAT INCENTIVE PROGRAM § 636.8 WHIP plan of... plan of operations encompasses the parcel of land where habitat will be established, improved... one of the following as determined by NRCS: (1) Fish and wildlife habitat conditions that are of...
7 CFR 636.8 - WHIP plan of operations.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING WILDLIFE HABITAT INCENTIVE PROGRAM § 636.8 WHIP plan of... plan of operations encompasses the parcel of land where habitat will be established, improved... one of the following as determined by NRCS: (1) Fish and wildlife habitat conditions that are of...
7 CFR 636.8 - WHIP plan of operations.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING WILDLIFE HABITAT INCENTIVE PROGRAM § 636.8 WHIP plan of... plan of operations encompasses the parcel of land where habitat will be established, improved... one of the following as determined by NRCS: (1) Fish and wildlife habitat conditions that are of...
Log sort yard economics, planning, and feasibility
John Rusty Dramm; Robert Govett; Ted Bilek; Gerry L. Jackson
2004-01-01
This publication discusses basic marketing and economic concepts, planning approach, and feasibility methodology for assessing log sort yard operations. Special attention is given to sorting small diameter and underutilized logs from forest restoration, fuels reduction, and thinning operations. A planned programming approach of objectively determining the feasibility...
ERIC Educational Resources Information Center
Melwood Horticultural Training Center, Inc., Upper Marlboro, MD.
This manual is intended as a resource for anyone involved in planning, developing, and/or operating a horticultural training or work co-op program for the handicapped. Following an introductory chapter, the manual is divided into three parts with the greatest weight given to the second part. Part I elaborates on development of the horticulture…
NASA Technical Reports Server (NTRS)
1972-01-01
The planning data are presented for subsequent phases of free-flying teleoperator program (FFTO) and includes costs, schedules and supporting research and technology activities required to implement the free-flying teleoperator system and associated flight equipment. The purpose of the data presented is to provide NASA with the information needed to continue development of the FFTO and integrate it into the space shuttle program. The planning data describes three major program phases consisting of activities and events scheduled to effect integrated design, development, fabrication and operation of an FFTO system. Phase A, Concept Generation, represents a study effort directed toward generating and evaluating a number of feasible FFTO experiment system concepts. Phase B, Definition, will include preliminary design and supporting analysis of the FFTO, the shuttle based equipment and ground support equipment. Phase C/D, Design, Development and Operations will include detail design of the operational FFTO, its integration into the space shuttle, hardware fabrication and testing, delivery of flight hardware and support of flight operations. Emphasis is placed on the planning for Phases A and B since these studies will be implemented early in the development cycle. Phase C/D planning is more general and subject to refinement during the definition phase.
Space Solar Power Program. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arif, Humayun; Barbosa, Hugo; Bardet, Christophe
1992-08-01
Information pertaining to the Space Solar Power Program is presented on energy analysis; markets; overall development plan; organizational plan; environmental and safety issues; power systems; space transportation; space manufacturing, construction, operations; design examples; and finance.
Setting up an Asbestos Operations and Maintenance (O&M) Program
Covers steps a buidling's O&M plan should including: appointing an asbestos program manager, inspecting the building, developing a plan, and if necessary selecting and implementing larger repair or abatement projects.
SCHOOL PLANT MANAGEMENT FOR SCHOOL ADMINISTRATORS.
ERIC Educational Resources Information Center
ENGMAN, JOHN DAVID
THIS REPORT IS A COMPILATION OF STUDIES ON SIGNIFICANT ASPECTS IN SCHOOL PLANNING AND OPERATION. A RELATIONSHIP IS SHOWN BETWEEN CURRICULUM, PERSONNEL AND AUXILIARY SERVICES IN EDUCATIONAL PROGRAM OPERATIONS. THE REPORT INCLUDES PLANNING, MANAGEMENT AND OPERATION OF SUCH AREAS AS--NONINSTRUCTIONAL PERSONNEL POLICIES, CUSTODIAL SERVICES,…
40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
Managing a palliative oncology program: the role of a business plan.
Walsh, D; Gombeski, W R; Goldstein, P; Hayes, D; Armour, M
1994-02-01
Today's health-care environment demands that palliative-care programs operate in a businesslike manner. This report summarizes the business plan and the process followed to develop the Palliative Care Program at the Cleveland Clinic Foundation (CCF). The benefits generated from this effort and the lessons learned that may be helpful to other program managers are described. By disciplining itself to focus on financial, marketing, and operational issues, the Palliative Care Program is in a better position to advance its clinical services within the organization and in its market area, and can thereby serve its patients more effectively.
Swimming Pools. A Guide to Their Planning, Design and Operation.
ERIC Educational Resources Information Center
Gabrielsen, M. Alexander, Ed.
Information is presented regarding all phases of swimming pool development and operation from earliest planning considerations to final programing. This comprehensive book covers--(1) the steps involved in planning a pool, (2) designing the pool, (3) water circulation, filtration, and treatment, (4) community pools, school and agency pools, and…
Action Research: Effective Marketing Strategies for a Blended University Program
ERIC Educational Resources Information Center
Cook, Ruth Gannon; Ley, Kathryn
2008-01-01
This action research study investigated a marketing plan based on collaboration among a program faculty team and other organizational units for a graduate professional program. From its inception through the second year of operation, program enrollment increased due to the marketing plan based on an effective approach grounded in simple marketing…
Timber management planning with timber ram and goal programming
Richard C. Field
1978-01-01
By using goal programming to enhance the linear programming of Timber RAM, multiple decision criteria were incorporated in the timber management planning of a National Forest in the southeastern United States. Combining linear and goal programming capitalizes on the advantages of the two techniques and produces operationally feasible solutions. This enhancement may...
DOT National Transportation Integrated Search
2018-05-31
This Comprehensive Maintenance and Operations Plan (CMOP) describes the types and number of equipment to be operated and maintained for the proposed New York City (NYC) Connected Vehicle Pilot Deployment (CVPD) system. Its objective is to develop a p...
Savannah River Site nuclear materials management plan FY 2017-2031
DOE Office of Scientific and Technical Information (OSTI.GOV)
Magoulas, V.
The purpose of the Nuclear Materials Management Plan (herein referred to as “this Plan”) is to integrate and document the activities required to disposition the legacy and/or surplus Enriched Uranium (EU) and Plutonium (Pu) and other nuclear materials already stored or anticipated to be received by facilities at the Department of Energy (DOE) Savannah River Site (SRS) as well as the activities to support the DOE Tritium mission. It establishes a planning basis for EU and Pu processing operations in Environmental Management Operations (EMO) facilities through the end of their program missions and for the tritium through the National Nuclearmore » Security Administration (NNSA) Defense Programs (DP) facilities. Its development is a joint effort among the Department of Energy - Savannah River (DOE-SR), DOE – Environmental Management (EM), NNSA Office of Material Management and Minimization (M3), NNSA Savannah River Field Office (SRFO), and the Management and Operations (M&O) contractor, Savannah River Nuclear Solutions, LLC (SRNS). Life-cycle program planning for Nuclear Materials Stabilization and Disposition and the Tritium Enterprise may use this Plan as a basis for the development of the nuclear materials disposition scope and schedule. This Plan assumes full funding to accomplish the required project and operations activities. It is recognized that some aspects of this Plan are pre decisional with regard to National Environmental Policy Act (NEPA); in such cases new NEPA actions will be required.« less
ERIC Educational Resources Information Center
Development Planning and Research Associates, Inc., Manhattan, KS.
This manual provides materials for a two-week inservice training program for Peace Corps volunteers on the planning, construction, and operation and maintenance of small-scale irrigation systems. The workshop is designed to be given by two experienced professionals: one with practical knowledge of irrigation system design, operation, and…
Phased project planning and development in anticipation of operational programs
NASA Technical Reports Server (NTRS)
Stroud, W. G.
1973-01-01
The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.
ERIC Educational Resources Information Center
Ohio State Univ., Columbus. Center on Education and Training for Employment.
This instructor guide for a unit on operations in the PACE (Program for Acquiring Competence in Entrepreneurship) curriculum includes the full text of the student module and lesson plans, instructional suggestions, and other teacher resources. The competencies that are incorporated into this module are at Level 2 of learning--planning for a…
ERIC Educational Resources Information Center
Perna, Laura W.
2005-01-01
This article describes what is known from prior research about the impact of student financial aid program design, operations, and marketing on the formation of family (including parents' and children's) college-going aspirations, expectations, and plans, and the resulting college-going behaviors of potential students. The review focuses on the…
Evaluation plan : the Branson Travel and Recreational Information Program field operational test
DOT National Transportation Integrated Search
1998-02-25
The Branson Travel and Recreational Information Program (TRIP) is a Field Operational Test (FOT) of Traveler Information Services in Tourism Areas funded through the National Advanced Rural Transportation Systems Program. Over the past ten years, Bra...
ERIC Educational Resources Information Center
Cole, R. D.; Hamreus, D. G.
This appendix presents the following tables of program component cost estimates: 1) instructional design and development; 2) instructional operations; 3) program management--policy creation and adoption, and policy and program execution; 4) program coordination--instructional objectives, adaptation, accommodation, and dissemination; 5) general…
Guidelines for Implementing a Real Estate Cooperative Education Program.
ERIC Educational Resources Information Center
Pearson, Thomas R.
Background information and guidelines are provided for the development of cooperative education programs for real estate industry personnel. The first section outlines the operation of cooperative education programs and presents two organizational plans: the alternating plan, where students attend class full-time and work full-time during…
Program definition and assessment overview. [for thermal energy storage project management
NASA Technical Reports Server (NTRS)
Gordon, L. H.
1980-01-01
The implementation of a program level assessment of thermal energy storage technology thrusts for the near and far term to assure overall coherent energy storage program is considered. The identification and definition of potential thermal energy storage applications, definition of technology requirements, and appropriate market sectors are discussed along with the necessary coordination, planning, and preparation associated with program reviews, workshops, multi-year plans and annual operating plans for the major laboratory tasks.
43 CFR 3162.3-1 - Drilling applications and plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Drilling applications and plans. 3162.3-1... for Operating Rights Owners and Operators § 3162.3-1 Drilling applications and plans. (a) Each well shall be drilled in conformity with an acceptable well-spacing program at a surveyed well location...
43 CFR 3162.3-1 - Drilling applications and plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Drilling applications and plans. 3162.3-1... for Operating Rights Owners and Operators § 3162.3-1 Drilling applications and plans. (a) Each well shall be drilled in conformity with an acceptable well-spacing program at a surveyed well location...
43 CFR 3162.3-1 - Drilling applications and plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Drilling applications and plans. 3162.3-1... for Operating Rights Owners and Operators § 3162.3-1 Drilling applications and plans. (a) Each well shall be drilled in conformity with an acceptable well-spacing program at a surveyed well location...
43 CFR 3162.3-1 - Drilling applications and plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Drilling applications and plans. 3162.3-1... for Operating Rights Owners and Operators § 3162.3-1 Drilling applications and plans. (a) Each well shall be drilled in conformity with an acceptable well-spacing program at a surveyed well location...
Converting CSV Files to RKSML Files
NASA Technical Reports Server (NTRS)
Trebi-Ollennu, Ashitey; Liebersbach, Robert
2009-01-01
A computer program converts, into a format suitable for processing on Earth, files of downlinked telemetric data pertaining to the operation of the Instrument Deployment Device (IDD), which is a robot arm on either of the Mars Explorer Rovers (MERs). The raw downlinked data files are in comma-separated- value (CSV) format. The present program converts the files into Rover Kinematics State Markup Language (RKSML), which is an Extensible Markup Language (XML) format that facilitates representation of operations of the IDD and enables analysis of the operations by means of the Rover Sequencing Validation Program (RSVP), which is used to build sequences of commanded operations for the MERs. After conversion by means of the present program, the downlinked data can be processed by RSVP, enabling the MER downlink operations team to play back the actual IDD activity represented by the telemetric data against the planned IDD activity. Thus, the present program enhances the diagnosis of anomalies that manifest themselves as differences between actual and planned IDD activities.
Overview of medical operations for a manned stratospheric balloon flight.
Blue, Rebecca S; Law, Jennifer; Norton, Sean C; Garbino, Alejandro; Pattarini, James M; Turney, Matthew W; Clark, Jonathan B
2013-03-01
Red Bull Stratos was a commercial program designed to bring a test parachutist protected by a full-pressure suit via a stratospheric balloon with a pressurized capsule to 120,000 ft (36,576 m), from which he would freefall and subsequently parachute to the ground. On March 15, 2012, the Red Bull Stratos program successfully conducted a preliminary manned balloon test flight and parachute jump, reaching a final altitude of 71,581 ft (21,818 m). In light of the uniqueness of the operation and medical threats faced, a comprehensive medical plan was needed to ensure prompt and efficient response to any medical contingencies. This report will serve to discuss the medical plans put into place before the first manned balloon flight and the actions of the medical team during that flight. The medical operations developed for this program will be systematically evaluated, particularly, specific recommendations for improvement in future high-altitude and commercial space activities. A multipronged approach to medical support was developed, consisting of event planning, medical personnel, equipment, contingency-specific considerations, and communications. Medical operations were found to be highly successful when field-tested during this stratospheric flight, and the experience allowed for refinement of medical operations for future flights. The lessons learned and practices established for this program can easily be used to tailor a plan specific to other aviation or spaceflight events.
1944-12-31
report of de struction is required. C. H. McMOHKCS Chief of Staff 258 DISTRIBUTION : Same as Op- Plan 14-44 1. E. KEETOW Asst. Flag Secretary...w by author*/ oficLIss OPERATION PLAN 14—44 ICEBERG \\. CiNcPOA BRIG GEN W.A.DUMAS FORC6S UNCLAES1FO Report Documentation Page Form ApprovedOMB No...4. TITLE AND SUBTITLE Operation Plan 14-44 Iceberg 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT
NASA Technical Reports Server (NTRS)
Manford, J. S.; Bennett, G. R.
1985-01-01
The Space Station Program will incorporate analysis of operations constraints and considerations in the early design phases to avoid the need for later modifications to the Space Station for operations. The application of modern tools and administrative techniques to minimize the cost of performing effective orbital operations planning and design analysis in the preliminary design phase of the Space Station Program is discussed. Tools and techniques discussed include: approach for rigorous analysis of operations functions, use of the resources of a large computer network, and providing for efficient research and access to information.
Productivity Sharing Programs: Can They Contribute to Productivity Improvement?
ERIC Educational Resources Information Center
General Accounting Office, Washington, DC.
Productivity sharing plans were studied to determine how they operate, what benefits result, and whether long-term increases in productivity can be realized through the program. Thirty-six firms were interviewed that had productivity sharing plans. Nine firms that had either rejected adoption of a productivity sharing plan or were still…
Risk management in international manned space program operations.
Seastrom, J W; Peercy, R L; Johnson, G W; Sotnikov, B J; Brukhanov, N
2004-02-01
New, innovative joint safety policies and requirements were developed in support of the Shuttle/Mir program, which is the first phase of the International Space Station program. This work has resulted in a joint multinational analysis culminating in joint certification for mission readiness. For these planning and development efforts, each nation's risk programs and individual safety practices had to be integrated into a comprehensive and compatible system that reflects the joint nature of the endeavor. This paper highlights the major incremental steps involved in planning and program integration during development of the Shuttle/Mir program. It traces the transition from early development to operational status and highlights the valuable lessons learned that apply to the International Space Station program (Phase 2). Also examined are external and extraneous factors that affected mission operations and the corresponding solutions to ensure safe and effective Shuttle/Mir missions. c2003 Published by Elsevier Ltd.
San Francisco Municipal Railway 5-Year Plan: 1979-1984
DOT National Transportation Integrated Search
1979-02-22
Presents MUNI's five year "master" plan for the programming of transit operations. It describes the existing system and what is anticipated for the future. It covers route design, operations, rolling stock requirements, and evaluates each on the basi...
NASA Technical Reports Server (NTRS)
Hamilton, M. H.
1971-01-01
The data links for use with the guidance system operations plan for manned command module earth orbital and lunar missions using program Colossus 3 are presented. The subjects discussed are: (1) digital uplink to CMC, (2) command module contiguous block update, (3) CMC retrofire external data update, (4) CMC digital downlink, and (5) CMC entry update.
Research and Technology Operating Plan Summary, Fiscal Year 1972 Research and Technology Program
NASA Technical Reports Server (NTRS)
1971-01-01
The NASA Research and Technology program for FY 1972 is presented. It is a compilation of the summary portions of each of the RTOPs (Research and Technology Operating Plan) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities.
Planning actions in robot automated operations
NASA Technical Reports Server (NTRS)
Das, A.
1988-01-01
Action planning in robot automated operations requires intelligent task level programming. Invoking intelligence necessiates a typical blackboard based architecture, where, a plan is a vector between the start frame and the goal frame. This vector is composed of partially ordered bases. A partial ordering of bases presents good and bad sides in action planning. Partial ordering demands the use of a temporal data base management system.
Test, Control and Monitor System (TCMS) operations plan
NASA Technical Reports Server (NTRS)
Macfarlane, C. K.; Conroy, M. P.
1993-01-01
The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.
International utilization and operations
NASA Technical Reports Server (NTRS)
Goldberg, Stanley R.
1989-01-01
The international framework of the Space Station Freedom Program is described. The discussion covers the U.S. space policy, international agreements, international Station elements, overall program management structure, and utilization and operations management. Consideration is also given to Freedom's user community, Freedom's crew, pressurized payload and attached payload accommodations, utilization and operations planning, user integration, and user operations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... will inspect, operate, and maintain each capture system according to the procedures in the plan. (2... will inspect, operate, and maintain each control device according to the procedures in the plan. (c... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS...
JWST Operations and the Phase I and II Process
NASA Astrophysics Data System (ADS)
Beck, Tracy L.
2010-07-01
The JWST operations and Phase I and Phase II process will build upon our knowledge on the current system in use for HST. The primary observing overheads associated with JWST observations, both direct and indirect, are summarized. While some key operations constraints for JWST may cause deviations from the HST model for proposal planning, the overall interface to JWST planning will use the APT and will appear similar to the HST interface. The requirement is to have a proposal planning model simlar to HST, where proposals submitted to the TAC must have at least the minimum amount of information necessary for assessment of the strength of the science. However, a goal of the JWST planning process is to have the submitted Phase I proposal in executable form, and as complete as possible for many programs. JWST will have significant constraints on the spacecraft pointing and orient, so it is beneficial for the planning process to have these scheduling constraints on programs defined as early as possible. The guide field of JWST is also much smaller than the HST guide field, so searches for available guide stars for JWST science programs must be done at the Phase I deadline. The long range observing plan for each JWST cycle will be generated intially from the TAC accepted programs at the Phase I deadline, and the LRP will be refined after the Phase II deadline when all scheduling constraints are defined.
Weather integration in TMC operations : a self-evaluation and planning guide.
DOT National Transportation Integrated Search
2009-04-01
This flyer describes how Traffic Management Centers (TMC) can integrate weather information into their daily operations, and is based on the Road Weather Management Program publication, Self-Evaluation and Planning Guide (FHWA-JPO-08-057). The Guide ...
30 CFR 780.38 - Support facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.38... description, plans, and drawings for each support facility to be constructed, used, or maintained within the...
30 CFR 784.30 - Support facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.30... description, plans, and drawings for each support facility to be constructed, used, or maintained within the...
DOT National Transportation Integrated Search
2015-12-01
The Florida Department of Transportation (FDOT) has initiated business plans to promote the Transportation : Systems Management and Operations (TSM&O) program throughout the State. TSM&O is traditionally managed : by traffic engineers that focus on o...
[Plan to improve malaria control towards its elimination in Mesoamerica].
Rodríguez, Mario Henry; Betanzos-Reyes, Angel Francisco
2011-01-01
To develop a plan to strengthen the control of malaria towards its elimination. In 2009, under the coordination of the National Public HealthInstitute ofMexico, atransdisciplinary equipment of technical and operative experts was conformed to carry out a situational analysis of malaria and control programs and for the selection of effective practices of intervention that would be incorporated to the plan, within the framework of an exercise in Theory of Change. Criteria for thestratificationof thelocalities, based ontheirtransmission characteristics were established. The structural and operative limitations of the control programs were identified. A plan of interventions was elaborated to improve the coverage of epidemiological surveillance, anti-malaria interventions and opportune diagnosis and treatment of cases. The plan delineates progressive phases of implementation: reorganization, intensification of interventions and evaluation of elimination feasibility. The adoption of a regional strategic plan will provide guidance and administrative elements to conform a system that coordinates the activities of the national control programs and facilitate the elimination of malaria in the region.
Extending ACTS Operations Through a University-Based Consortium
NASA Technical Reports Server (NTRS)
Bauer, Robert; Krawcyzk, Richard; Irwin, Dennis; Kruse, Hans
2001-01-01
The Advanced Communications Technology Satellite (ACTS) program was slated for decommissioning in October 2000 as was announced at the 6th Ka-band Utilization Conference in May 2000. Quite a celebration was had at that event too centering on the decommissioning of this very successful technology program. With plans in place to move the spacecraft to an orbital graveyard and then shut the system down, NASA was challenged to consider the feasibility of extending operations for education and research purposes provided that an academic organization would be willing to cover operations costs. Continuing operations of the system was determined viable and in the fall of 2000, an announcement was made by NASA to consider extending operations. Plans are now in place to continue the operations of ACTS through a university-based consortium led by Ohio University, Athens, Ohio. Initial plans are for two more years of operations, with options to extend up to a total of four years. This paper will present the change in plans to continue operations of ACTS. A description of the multi-month transition of the spacecraft to its new and final orbital location is provided. With the spacecraft at this new location, an update on its performance is presented as well as estimates of long-term performance. The consortium development will be presented along with its organization, membership, and operations plans for using ACTS.
75 FR 81120 - North Dakota Regulatory Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-27
... North Dakota's program and program amendments at 30 CFR 934.15, 934.16, and 934.30. II. Submission of... proposes revisions to the North Dakota Century Code at Chapter 38-14.1-24(18) (Environmental protection... applications--operation plans--maps and plans) and Article 69-05.2-22-07(2) and (4)(i) (Performance standards...
Future pension accounting changes: implications for hospitals.
Weld, Tim; Klein, Gina
2011-05-01
Proposed rules in accounting for defined benefit plans may affect hospitals' statement of operations and affect the time, effort, and cost to comply with periodic financial reporting requirements. The new standard would require immediate recognition of the full amount of plan amendments in determining operating income. Hospitals should consider the role of pension plans in their compensation programs.
14 CFR 91.1039 - IFR takeoff, approach and landing minimums.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) For flight planning purposes, if the destination airport does not have a weather reporting facility... TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Fractional... on a program aircraft operating a program flight may begin an instrument approach procedure to an...
14 CFR 91.1039 - IFR takeoff, approach and landing minimums.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) For flight planning purposes, if the destination airport does not have a weather reporting facility... TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Fractional... on a program aircraft operating a program flight may begin an instrument approach procedure to an...
14 CFR 91.1039 - IFR takeoff, approach and landing minimums.
Code of Federal Regulations, 2013 CFR
2013-01-01
...) For flight planning purposes, if the destination airport does not have a weather reporting facility... TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Fractional... on a program aircraft operating a program flight may begin an instrument approach procedure to an...
14 CFR 91.1039 - IFR takeoff, approach and landing minimums.
Code of Federal Regulations, 2012 CFR
2012-01-01
...) For flight planning purposes, if the destination airport does not have a weather reporting facility... TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Fractional... on a program aircraft operating a program flight may begin an instrument approach procedure to an...
14 CFR 91.1039 - IFR takeoff, approach and landing minimums.
Code of Federal Regulations, 2014 CFR
2014-01-01
...) For flight planning purposes, if the destination airport does not have a weather reporting facility... TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Fractional... on a program aircraft operating a program flight may begin an instrument approach procedure to an...
DORCA 2 computer program. Volume 3: Program listing
NASA Technical Reports Server (NTRS)
Carey, J. B.
1972-01-01
A program listing for the Dynamic Operational Requirements and Cost Analysis Program is presented. Detailed instructions for the computer programming involved in space mission planning and project requirements are developed.
Computerized Numerical Control Curriculum Guide.
ERIC Educational Resources Information Center
Reneau, Fred; And Others
This guide is intended for use in a course in programming and operating a computerized numerical control system. Addressed in the course are various aspects of programming and planning, setting up, and operating machines with computerized numerical control, including selecting manual or computer-assigned programs and matching them with…
Farmers and Bankers Are Interested in F.B.P.A. (Farm Business Planning and Analysis)
ERIC Educational Resources Information Center
Borton, John L.
1974-01-01
A successful Farm Business Planning and Analysis program is being taught by the Upper Sandusky, Ohio, Vocational Agriculture Department fo farm operators, farm couples, bankers, and vocational agriculture teachers and students. The F.B.P.A. program consists of developing a record system, summarizing and analyzing the system, and planning future…
ERIC Educational Resources Information Center
United Nations Children's Fund, Kabul (Afghanistan).
This Master Plan of Operation has two parts: The Framework and the Program. Part I (the Framework) sets out the articles of agreement between the Government of Afghanistan and the United Nations Children's Fund (UNICEF) concerning a 1-year program for the improvement of social services for children and mothers regarded as the most disadvantaged…
NASA Technical Reports Server (NTRS)
2005-01-01
The purpose of this document is to present the findings that resulted from a high-level analysis and evaluation of the following documents: (1) The OEP (Operational Evolution Plan) Version 7 -- a 10-year plan for operational improvements to increase capacity and efficiency in U.S. air travel and transport and other use of domestic airspace. The OEP is the FAA commitment to operational improvements. It is outcome driven, with clear lines of accountability within FAA organizations. The OEP concentrates on operational solutions and integrates safety, certification, procedures, staffing, equipment, avionics and research; (2) The Draft Flight Plan 2006 through 2010 -- a multi-year strategic effort, setting a course for the FAA through 2001, to provide the safest and most efficient air transportation system in the world; (3) The NAS System Architecture Version 5 -- a blueprint for modernizing the NAS and improving NAS services and capabilities through the year 2015; and (4) The NAS-SR-1000 System Requirements Specification (NASSRS) -- a compilation of requirements which describe the operational capabilities for the NAS. The analysis is particularly focused on examining the documents for relevance to existing and/or planned future UAV operations. The evaluation specifically focuses on potential factors that could materially affect the development of a commercial ROA industry, such as: (1) Design limitations of the CNS/ATM system, (2) Human limitations, The information presented was taken from program specifications or program office lead personnel.
Oceanographic Remote Sensing; A Position Paper,
1979-01-26
The purpose of a Navy R&D remote sensing plan should be to set forth the requirements and direction of basic and exploratory research in satellite... remote sensing which supports the overall Navy oceanographic research and operational programs. The aim of the plan would be to outline the established...addressed. The plan should help serve as a single technology and program reference for implementation and planning of Navy related satellite remote
2010-05-01
23 Task Execution Plan 34 – Temperature Testing of Pyridostigmine Bromide (PB) .......... 23 KEY RESEARCH ACCOMPLISHMENTS...29, 2010. Staff was assembled and materials have been ordered. Task Execution Plan (TEP) 0034 – Temperature Testing of Pyridostigmine Bromide
EVALUATION OF THE IMPLEMENTATION OF OPERATIONS AND MAINTENANCE PROGRAMS IN NEW JERSEY SCHOOLS
The Asbestos Hazard Emergency Response Act (AHERA) required all schools to develop and implement an asbestos management plan (AMP). The key component of the AMP is the operations and maintenance (O&M) program. A study was conducted to evaluate the implementation of O&M programs a...
Improving Program Performance through Management Information. A Workbook.
ERIC Educational Resources Information Center
Bienia, Nancy
Designed specifically for state and local managers and supervisors who plan, direct, and operate child support enforcement programs, this workbook provides a four-part, step-by-step process for identifying needed information and methods of using the information to operate an effective program. The process consists of: (1) determining what…
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true Can a tribe operating under a tribal redesign plan go back to operating under this part? 20.209 Section 20.209 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR HUMAN SERVICES FINANCIAL ASSISTANCE AND SOCIAL SERVICES PROGRAMS Welfare Reform § 20.209...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false Can a tribe operating under a tribal redesign plan go back to operating under this part? 20.209 Section 20.209 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR HUMAN SERVICES FINANCIAL ASSISTANCE AND SOCIAL SERVICES PROGRAMS Welfare Reform § 20...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Can a tribe operating under a tribal redesign plan go back to operating under this part? 20.209 Section 20.209 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR HUMAN SERVICES FINANCIAL ASSISTANCE AND SOCIAL SERVICES PROGRAMS Welfare Reform § 20...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Can a tribe operating under a tribal redesign plan go back to operating under this part? 20.209 Section 20.209 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR HUMAN SERVICES FINANCIAL ASSISTANCE AND SOCIAL SERVICES PROGRAMS Welfare Reform § 20...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false Can a tribe operating under a tribal redesign plan go back to operating under this part? 20.209 Section 20.209 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR HUMAN SERVICES FINANCIAL ASSISTANCE AND SOCIAL SERVICES PROGRAMS Welfare Reform § 20...
Research on Sino-Australia Co-operative Program Teaching Management Pattern and Implementation Plan
ERIC Educational Resources Information Center
Yang, Dong
2008-01-01
With the rapid development of Chinese economy and education, deepening reform and open-up policy, more and more co-operative education programs are established in China. Among them, some programs are just copies of Western style or pattern, which has no Chinese characteristics. This article elaborates on the Sino-Australia program offered at…
Discovery Planetary Mission Operations Concepts
NASA Technical Reports Server (NTRS)
Coffin, R.
1994-01-01
The NASA Discovery Program of small planetary missions will provide opportunities to continue scientific exploration of the solar system in today's cost-constrained environment. Using a multidisciplinary team, JPL has developed plans to provide mission operations within the financial parameters established by the Discovery Program. This paper describes experiences and methods that show promise of allowing the Discovery Missions to operate within the program cost constraints while maintaining low mission risk, high data quality, and reponsive operations.
International Space Station Increment Operations Services
NASA Astrophysics Data System (ADS)
Michaelis, Horst; Sielaff, Christian
2002-01-01
The Industrial Operator (IO) has defined End-to-End services to perform efficiently all required operations tasks for the Manned Space Program (MSP) as agreed during the Ministerial Council in Edinburgh in November 2001. Those services are the result of a detailed task analysis based on the operations processes as derived from the Space Station Program Implementation Plans (SPIP) and defined in the Operations Processes Documents (OPD). These services are related to ISS Increment Operations and ATV Mission Operations. Each of these End-to-End services is typically characterised by the following properties: It has a clearly defined starting point, where all requirements on the end-product are fixed and associated performance metrics of the customer are well defined. It has a clearly defined ending point, when the product or service is delivered to the customer and accepted by him, according to the performance metrics defined at the start point. The implementation of the process might be restricted by external boundary conditions and constraints mutually agreed with the customer. As far as those are respected the IO has the free choice to select methods and means of implementation. The ISS Increment Operations Service (IOS) activities required for the MSP Exploitation program cover the complete increment specific cycle starting with the support to strategic planning and ending with the post increment evaluation. These activities are divided into sub-services including the following tasks: - ISS Planning Support covering the support to strategic and tactical planning up to the generation - Development &Payload Integration Support - ISS Increment Preparation - ISS Increment Execution These processes are tight together by the Increment Integration Management, which provides the planning and scheduling of all activities as well as the technical management of the overall process . The paper describes the entire End-to-End ISS Increment Operations service and the implementation to support the Columbus Flight 1E related increment and subsequent ISS increments. Special attention is paid to the implications caused by long term operations on hardware, software and operations personnel.
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for marketing I-II and fashion merchandising. Presented first are a program…
Code of Federal Regulations, 2011 CFR
2011-01-01
... distribute nutrition services and administration funds, including start-up funds, to local agencies operating... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program is operated in accordance with the State Plan. FNS will provide written approval or denial of a...
Code of Federal Regulations, 2010 CFR
2010-01-01
... distribute nutrition services and administration funds, including start-up funds, to local agencies operating... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program is operated in accordance with the State Plan. FNS will provide written approval or denial of a...
42 CFR 417.413 - Qualifying condition: Operating experience and enrollment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE PROGRAM HEALTH MAINTENANCE ORGANIZATIONS, COMPETITIVE MEDICAL PLANS, AND HEALTH CARE PREPAYMENT PLANS Qualifying Conditions for Medicare Contracts § 417.413..., as appropriate. (b) Standard: Enrollment and operating experience for HMOs or CMPs to contract on a...
40 CFR 62.14610 - How do I maintain my operator qualification?
Code of Federal Regulations, 2013 CFR
2013-07-01
...) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That...) Responses to malfunctions or conditions that may lead to malfunction. (e) Discussion of operating problems...
International Space Station Payload Operations Integration Center (POIC) Overview
NASA Technical Reports Server (NTRS)
Ijames, Gayleen N.
2012-01-01
Objectives and Goals: Maintain and operate the POIC and support integrated Space Station command and control functions. Provide software and hardware systems to support ISS payloads and Shuttle for the POIF cadre, Payload Developers and International Partners. Provide design, development, independent verification &validation, configuration, operational product/system deliveries and maintenance of those systems for telemetry, commanding, database and planning. Provide Backup Control Center for MCC-H in case of shutdown. Provide certified personnel and systems to support 24x7 facility operations per ISS Program. Payloads CoFR Implementation Plan (SSP 52054) and MSFC Payload Operations CoFR Implementation Plan (POIF-1006).
ERIC Educational Resources Information Center
Corley, Clifford L.; Koch, Norman E.
The purpose of this paper is to identify and describe background information and possible indicators for future planning of elementary education, as a prerequisite to planning realistic education programs for early childhood and elementary school teachers. Developments considered include population growth, changing cultural characteristics,…
ERIC Educational Resources Information Center
HIATT, ROBERT W.
A SURVEY OF POLICIES AND PROGRAMS AT THE UNIVERSITY OF HAWAII'S MANOA AND HILO CAMPUS IS USED AS THE BASIS OF A DEVELOPMENT PLAN. THE SURVEY DISCUSSES PROGRAMS AND FACILITY NEEDS IN RELATION TO THE OBJECTIVES OF INSTRUCTION, RESEARCH AND PUBLIC SERVICE. IMPLEMENTATION OF THE DEVELOPMENT PLAN INCLUDES DISCUSSION OF OPERATING BUDGET, CURRENT…
29 CFR 1952.383 - Completion of developmental steps and certification.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., March, 1978. (g) Adopt the Field Operations Manual, April, 1980. (h) Adopt management information system... plan personnel by March, 1978. (b) Public information program (private sector), one year after plan..., August, 1978. (k) Public information program (government sector), February, 1980. (l) Analysis for...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Fivemore » priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs.« less
Tug fleet and ground operations schedules and controls. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1975-01-01
This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.
NASA Technical Reports Server (NTRS)
1989-01-01
The Life Science Division of the NASA Office of Space Science and Applications (OSSA) describes its plans for assuring the health, safety, and productivity of astronauts in space, and its plans for acquiring further fundamental scientific knowledge concerning space life sciences. This strategic implementation plan details OSSA's goals, objectives, and planned initiatives. The following areas of interest are identified: operational medicine; biomedical research; space biology; exobiology; biospheric research; controlled ecological life support; flight programs and advance technology development; the life sciences educational program; and earth benefits from space life sciences.
Review of Issues Associated with Safe Operation and Management of the Space Shuttle Program
NASA Technical Reports Server (NTRS)
Johnstone, Paul M.; Blomberg, Richard D.; Gleghorn, George J.; Krone, Norris J.; Voltz, Richard A.; Dunn, Robert F.; Donlan, Charles J.; Kauderer, Bernard M.; Brill, Yvonne C.; Englar, Kenneth G.;
1996-01-01
At the request of the President of the United States through the Office of Science and Technology Policy (OSTP), the NASA Administrator tasked the Aerospace Safety Advisory Panel with the responsibility to identify and review issues associated with the safe operation and management of the Space Shuttle program arising from ongoing efforts to improve and streamline operations. These efforts include the consolidation of operations under a single Space Flight Operations Contract (SFOC), downsizing the Space Shuttle workforce and reducing costs of operations and management. The Panel formed five teams to address the potentially significant safety impacts of the seven specific topic areas listed in the study Terms of Reference. These areas were (in the order in which they are presented in this report): Maintenance of independent safety oversight; implementation plan for the transition of Shuttle program management to the Lead Center; communications among NASA Centers and Headquarters; transition plan for downsizing to anticipated workforce levels; implementation of a phased transition to a prime contractor for operations; Shuttle flight rate for Space Station assembly; and planned safety and performance upgrades for Space Station assembly. The study teams collected information through briefings, interviews, telephone conversations and from reviewing applicable documentation. These inputs were distilled by each team into observations and recommendations which were then reviewed by the entire Panel.
Succession planning for technical experts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kirk, Bernadette Lugue; Cain, Ronald A.; Dewji, Shaheen A.
This report describes a methodology for identifying, evaluating, and mitigating the loss of key technical skills at nuclear operations facilities. The methodology can be adapted for application within regulatory authorities and research and development organizations, and can be directly applied by international engagement partners of the Department of Energy’s National Nuclear Security Administration (NNSA). The resultant product will be of direct benefit to two types of NNSA missions: (1) domestic human capital development programs tasked to provide focused technical expertise to succeed an aging nuclear operations workforce, and (2) international safeguards programs charged with maintaining operational safeguards for developing/existing nuclearmore » power program in nations where minimal available resources must be used effectively. This report considers succession planning and the critical skills necessary to meet an institution’s goals and mission. Closely tied to succession planning are knowledge management and mentorship. In considering succession planning, critical skill sets are identified and are greatly dependent on the subject matter expert in question. This report also provides examples of critical skills that are job specific.« less
CxP Medical Operations Concept of Operations (CONOPS)
NASA Technical Reports Server (NTRS)
Scheuring, Richard A.
2010-01-01
This slide presentation reviews the planned medical operations for manned missions to the Moon and Mars as outlined in the Constellation program. Many of the issues involving the medical operations are examined.
7 CFR 623.13 - Wetlands reserve plan of operations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... wetland restoration activities and future management and easement monitoring in connection with the land... 7 Agriculture 6 2010-01-01 2010-01-01 false Wetlands reserve plan of operations. 623.13 Section... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE WATER RESOURCES EMERGENCY WETLANDS RESERVE PROGRAM § 623.13...
7 CFR 623.13 - Wetlands reserve plan of operations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... wetland restoration activities and future management and easement monitoring in connection with the land... 7 Agriculture 6 2011-01-01 2011-01-01 false Wetlands reserve plan of operations. 623.13 Section... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE WATER RESOURCES EMERGENCY WETLANDS RESERVE PROGRAM § 623.13...
23 CFR 450.202 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-04-01
... organizations (MPOs) and public transportation operators) that are responsible for satisfying the requirements... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.202 Applicability. The provisions of this...
Strategic planning in an academic radiation medicine program.
Hamilton, J L; Foxcroft, S; Moyo, E; Cooke-Lauder, J; Spence, T; Zahedi, P; Bezjak, A; Jaffray, D; Lam, C; Létourneau, D; Milosevic, M; Tsang, R; Wong, R; Liu, F F
2017-12-01
In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations.
Strategic planning in an academic radiation medicine program
Hamilton, J.L.; Foxcroft, S.; Moyo, E.; Cooke-Lauder, J.; Spence, T.; Zahedi, P.; Bezjak, A.; Jaffray, D.; Lam, C.; Létourneau, D.; Milosevic, M.; Tsang, R.; Wong, R.; Liu, F.F.
2017-01-01
Background In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Methods Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. Results The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. Conclusions The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations. PMID:29270061
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER WM) operations at DOE sites to be safer,more » faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs.« less
A Biosecurity Checklist for School Foodservice Programs: Developing a Biosecurity Management Plan
ERIC Educational Resources Information Center
US Department of Agriculture, 2004
2004-01-01
The purpose of this document is to introduce the need for securing foodservice operations from bioterrorism, provide a checklist of suggestions for improving the security of foodservice operations, and assist individuals responsible for school food service programs in strengthening the safety of the foodservice operation. While not mandatory, the…
The Denver region traffic signal system improvement program : planning for management and operations
DOT National Transportation Integrated Search
2009-04-01
The Denver Regional Council of Governments (DRCOG) works with over 30 local jurisdictions on the Traffic Signal System Improvement Program (TSSIP), a combination of management and operations strategies designed to time and coordinate traffic signals ...
22 CFR Appendix I to Part 211 - Operational Plan
Code of Federal Regulations, 2014 CFR
2014-04-01
... for the selection of the geographical areas where programs will be carried out; the calculation of... extension services. Describe specific areas of collaboration relative to program purposes. (6) Monitoring...) and (b), will be met. 5. Logistics. Provide a logistics plan that demonstrates the adequacy and...
22 CFR Appendix I to Part 211 - Operational Plan
Code of Federal Regulations, 2011 CFR
2011-04-01
... for the selection of the geographical areas where programs will be carried out; the calculation of... extension services. Describe specific areas of collaboration relative to program purposes. (6) Monitoring...) and (b), will be met. 5. Logistics. Provide a logistics plan that demonstrates the adequacy and...
22 CFR Appendix I to Part 211 - Operational Plan
Code of Federal Regulations, 2012 CFR
2012-04-01
... for the selection of the geographical areas where programs will be carried out; the calculation of... extension services. Describe specific areas of collaboration relative to program purposes. (6) Monitoring...) and (b), will be met. 5. Logistics. Provide a logistics plan that demonstrates the adequacy and...
22 CFR Appendix I to Part 211 - Operational Plan
Code of Federal Regulations, 2013 CFR
2013-04-01
... for the selection of the geographical areas where programs will be carried out; the calculation of... extension services. Describe specific areas of collaboration relative to program purposes. (6) Monitoring...) and (b), will be met. 5. Logistics. Provide a logistics plan that demonstrates the adequacy and...
Final safety analysis report for the Ground Test Accelerator (GTA), Phase 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-10-01
This document is the second volume of a 3 volume safety analysis report on the Ground Test Accelerator (GTA). The GTA program at the Los Alamos National Laboratory (LANL) is the major element of the national Neutral Particle Beam (NPB) program, which is supported by the Strategic Defense Initiative Office (SDIO). A principal goal of the national NPB program is to assess the feasibility of using hydrogen and deuterium neutral particle beams outside the Earth`s atmosphere. The main effort of the NPB program at Los Alamos concentrates on developing the GTA. The GTA is classified as a low-hazard facility, exceptmore » for the cryogenic-cooling system, which is classified as a moderate-hazard facility. This volume consists of failure modes and effects analysis; accident analysis; operational safety requirements; quality assurance program; ES&H management program; environmental, safety, and health systems critical to safety; summary of waste-management program; environmental monitoring program; facility expansion, decontamination, and decommissioning; summary of emergency response plan; summary plan for employee training; summary plan for operating procedures; glossary; and appendices A and B.« less
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
Participating in the Direct Student Loan Program: Tips for Success.
ERIC Educational Resources Information Center
Macro International, Inc., Calverton, MD.
This guide provides information for schools considering whether to participate in the Federal Direct Student Loan Program, and it offers advice on how to plan for and operate the loan program at an individual school. The information in the guide is presented in a way that follows the steps that need to be taken in planning and implementing the…
ERIC Educational Resources Information Center
Center for Occupational Research and Development, Inc., Waco, TX.
This program planning guide for a two-year postsecondary radiation protection technician program is designed for use with courses 17-22 of thirty-five included in the Nuclear Technology Series. The purpose of the guide is to describe the nuclear power field and its job categories for specialists, technicians, and operators; and to assist planners,…
ERIC Educational Resources Information Center
Larson, Milton E.
This guide is designed for use by any person or groups of persons responsible for planning occupational programs in the machine trades. Its major purpose is to elicit the necessary information for the writing of educational specifications for facilities to house needed vocational programs in machine tool operation, machine shop, and tool and die…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laney, T.
The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less
Workshop proceedings: Information Systems for Space Astrophysics in the 21st Century, volume 1
NASA Technical Reports Server (NTRS)
Cutts, James (Editor); Ng, Edward (Editor)
1991-01-01
The Astrophysical Information Systems Workshop was one of the three Integrated Technology Planning workshops. Its objectives were to develop an understanding of future mission requirements for information systems, the potential role of technology in meeting these requirements, and the areas in which NASA investment might have the greatest impact. Workshop participants were briefed on the astrophysical mission set with an emphasis on those missions that drive information systems technology, the existing NASA space-science operations infrastructure, and the ongoing and planned NASA information systems technology programs. Program plans and recommendations were prepared in five technical areas: Mission Planning and Operations; Space-Borne Data Processing; Space-to-Earth Communications; Science Data Systems; and Data Analysis, Integration, and Visualization.
Orbital Express Mission Operations Planning and Resource Management using ASPEN
NASA Technical Reports Server (NTRS)
Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Danny
2008-01-01
The Orbital Express satellite servicing demonstrator program is a DARPA program aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consists of: a) the Autonomous Space Transport Robotic Operations (ASTRO) vehicle, under development by Boeing Integrated Defense Systems, and b) a prototype modular next-generation serviceable satellite, NEXTSat, being developed by Ball Aerospace. Flexibility of ASPEN: a) Accommodate changes to procedures; b) Accommodate changes to daily losses and gains; c) Responsive re-planning; and d) Critical to success of mission planning Auto-Generation of activity models: a) Created plans quickly; b) Repetition/Re-use of models each day; and c) Guarantees the AML syntax. One SRP per day vs. Tactical team
Tank waste remediation system configuration management implementation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
1998-03-31
The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-10-01
This document supersedes the previous one, taking into account changes that have taken place in the CFS Science and Technology (S and T) program structure and organization, and in the structure of the Program of Energy Research and Development, the source of funding for CFS bioenergy research. It explains the rationale and overall objective for the bioenergy research program and briefly reviews the accomplishments to date. It indicates the planning context within which the program operates, states the specific objectives for the period of the plan, and details the strategic priorities developed for this period. Finally, it outlines the implementationmore » process for the plan.« less
Maintenance & construction operations user service : an addendum to the ITS program plan
DOT National Transportation Integrated Search
2001-01-26
The Maintenance and Construction Operations User Service describes the need for integrating key activities. Generally, key Maintenance and Construction Operations (MCO) activities include monitoring, operating, maintaining, improving, and managing th...
South Dakota ITS/CVO business plan : final business plan
DOT National Transportation Integrated Search
1998-01-18
This report defines an Intelligent Transportation Systems/Commercial Vehicle Operations (ITS/CVO) program for the State of South Dakota. Structured as a business plan, the document includes the following components: 1) description of the current CVO ...
The U.S. Geological Survey Strategic Plan 1999-2009
,
1999-01-01
This new version of the USGS Strategic Plan builds on our first strategic plan, which was developed in 1996, and focuses specifically on strategic goals in four areas: customers, programs, people, and operations of the USGS.
Decision support systems for transportation system management and operations (TSM&O) : [summary].
DOT National Transportation Integrated Search
2016-01-01
The Transportation System Management and Operations (TSM&O) program of the Florida : Department of Transportation (FDOT) has seven objectives, which are listed in the TSM&O : Tier 2 business plan. Two important objectives of the program are to con...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-06
... subcontractor, VIVA Consulting LLC, a study of the Section 202 Supportive Housing for the Elderly Demonstration Planning Grant Program. The Section 202 Supportive Housing for the Elderly program provides capital advances and operating funds to nonprofit organizations (``sponsors'') to develop affordable elderly...
34 CFR 477.3 - What activities may the Secretary fund?
Code of Federal Regulations, 2013 CFR
2013-07-01
... VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE PROGRAM ANALYSIS ASSISTANCE AND POLICY STUDIES... directly or through awards: (a) An analysis of State plans and of the findings of evaluations conducted in... planning or program operation. (b) The provision of an information network (in conjunction with the...
34 CFR 477.3 - What activities may the Secretary fund?
Code of Federal Regulations, 2014 CFR
2014-07-01
... VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE PROGRAM ANALYSIS ASSISTANCE AND POLICY STUDIES... directly or through awards: (a) An analysis of State plans and of the findings of evaluations conducted in... planning or program operation. (b) The provision of an information network (in conjunction with the...
34 CFR 477.3 - What activities may the Secretary fund?
Code of Federal Regulations, 2011 CFR
2011-07-01
... VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE PROGRAM ANALYSIS ASSISTANCE AND POLICY STUDIES... directly or through awards: (a) An analysis of State plans and of the findings of evaluations conducted in... planning or program operation. (b) The provision of an information network (in conjunction with the...
34 CFR 477.3 - What activities may the Secretary fund?
Code of Federal Regulations, 2010 CFR
2010-07-01
... VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE PROGRAM ANALYSIS ASSISTANCE AND POLICY STUDIES... directly or through awards: (a) An analysis of State plans and of the findings of evaluations conducted in... planning or program operation. (b) The provision of an information network (in conjunction with the...
34 CFR 477.3 - What activities may the Secretary fund?
Code of Federal Regulations, 2012 CFR
2012-07-01
... VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE PROGRAM ANALYSIS ASSISTANCE AND POLICY STUDIES... directly or through awards: (a) An analysis of State plans and of the findings of evaluations conducted in... planning or program operation. (b) The provision of an information network (in conjunction with the...
77 FR 38680 - NASA Advisory Council; Human Exploration and Operations Committee; Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-28
... persons, scientific and technical information relevant to program planning. DATES: Monday, July 23, 2012... Goddard Space Flight Center (GSFC), Building 1, Room E100D, 8800 Greenbelt Road, Greenbelt, MD 20771. FOR... Session with the NAC Science Committee on Mars Program Planning Group and Joint Robotic Precursor...
NASA Technical Reports Server (NTRS)
Ferlita, F.
1989-01-01
The Advanced Launch Systems (ALS) Advanced Development Oxidizer Turbopump Program has designed, fabricated and demonstrated a low cost, highly reliable oxidizer turbopump for the Space Transportation Engine that minimizes the recurring cost for the ALS engines. Pratt and Whitney's (P and W's) plan for integrating the analyses, testing, fabrication, and other program efforts is addressed. This plan offers a comprehensive description of the total effort required to design, fabricate, and test the ALS oxidizer turbopump. The proposed ALS oxidizer turbopump reduces turbopump costs over current designs by taking advantage of design simplicity and state-of-the-art materials and producibility features without compromising system reliability. This is accomplished by selecting turbopump operating conditions that are within known successful operating regions and by using proven manufacturing techniques.
Upgrade Project Fermilab Campus Master Plan Fermilab Campus & Facilities Planning Board Fermilab Chief Operations Officer, leads development of campus master planning and the associated execution of a program. The Campus Strategy identifies projects over a ten-year planning horizon to meet the projected
Manned space flight nuclear system safety. Volume 6: Space base nuclear system safety plan
NASA Technical Reports Server (NTRS)
1972-01-01
A qualitative identification of the steps required to assure the incorporation of radiological system safety principles and objectives into all phases of a manned space base program are presented. Specific areas of emphasis include: (1) radiological program management, (2) nuclear system safety plan implementation, (3) impact on program, and (4) summary of the key operation and design guidelines and requirements. The plan clearly indicates the necessity of considering and implementing radiological system safety recommendations as early as possible in the development cycle to assure maximum safety and minimize the impact on design and mission plans.
Autonomous Mission Manager for Rendezvous, Inspection and Mating
NASA Technical Reports Server (NTRS)
Zimpfer, Douglas J.
2003-01-01
To meet cost and safety objectives, space missions that involve proximity operations between two vehicles require a high level of autonomy to successfully complete their missions. The need for autonomy is primarily driven by the need to conduct complex operations outside of communication windows, and the communication time delays inherent in space missions. Autonomy also supports the goals of both NASA and the DOD to make space operations more routine, and lower operational costs by reducing the requirement for ground personnel. NASA and the DoD have several programs underway that require a much higher level of autonomy for space vehicles. NASA's Space Launch Initiative (SLI) program has ambitious goals of reducing costs by a factor or 10 and improving safety by a factor of 100. DARPA has recently begun its Orbital Express to demonstrate key technologies to make satellite servicing routine. The Air Force's XSS-ll program is developing a protoflight demonstration of an autonomous satellite inspector. A common element in space operations for many NASA and DOD missions is the ability to rendezvous, inspect anclJor dock with another spacecraft. For DARPA, this is required to service or refuel military satellites. For the Air Force, this is required to inspect un-cooperative resident space objects. For NASA, this is needed to meet the primary SLI design reference mission of International Space Station re-supply. A common aspect for each of these programs is an Autonomous Mission Manager that provides highly autonomous planning, execution and monitoring of the rendezvous, inspection and docking operations. This paper provides an overview of the Autonomous Mission Manager (AMM) design being incorporated into many of these technology programs. This AMM provides a highly scalable level of autonomous operations, ranging from automatic execution of ground-derived plans to highly autonomous onboard planning to meet ground developed mission goals. The AMM provides the capability to automatically execute the plans and monitor the system performance. In the event of system dispersions or failures the AMM can modify plans or abort to assure overall system safety. This paper describes the design and functionality of Draper's AMM framework, presents concept of operations associated with the use of the AMM, and outlines the relevant features of the flight demonstrations.
1989-01-01
Among other things, this US Act makes appropriations for foreign operations, export financing, and related programs. With respect to these appropriations, it does the following: 1) prohibits funding for coercive abortion or forced sterilization as part of bilateral development and population planning assistance; 2) prohibits the use of funds appropriated under the Act to lobby for abortion; and 3) prohibits the use of development assistance funds to pay for abortions or involuntary sterilizations as a method of family planning or to motivate or coerce any persons to practice abortions or undergo sterilization, or any biomedical research concerning abortions or involuntary sterilization as a method of family planning. The Act also reaffirms the congressional commitment to population planning, development assistance, and the need for informed voluntary family planning.
Operational Focused Simulation
2009-12-01
selected technologies. In order to build the scenario to fit the vignette, the Theater Battle Management Core System ( TBMCS ) databases were adjusted... TBMCS program provided an automated and integrated capability to plan and execute the air battle plan for the modeling and simulation efforts. TBMCS ...is the operational system of record for the Air and Space Operations Center Weapons System (AOC WS). TBMCS provides the Joint/Combined Forces Air
The clinician's guide to composing effective business plans.
Ettinger, Alan B; Blondell, Catherine
2011-01-01
In today's challenging healthcare environment, clinicians need to understand the fundamentals of financial analysis, which are the underpinnings of their clinical programs, especially when seeking administrative support for new initiatives. The business plan for new clinical program initiatives is composed of diverse elements such as the mission statement, market and competitive analyses, operations plan, and financial analysis. Armed with a basic knowledge of financial analysis of clinical programs, as well as forward-looking analysis of an initiative's added value, the healthcare provider can work much more effectively with administration in developing or creating new healthcare program initiatives.
NASA Technical Reports Server (NTRS)
1976-01-01
The results are presented of the AMPS Phase C/D (Design, Development, and Operations) program analysis and planning effort. Cost and schedule estimates are included. Although the AMPS program has been specifically addressed, these task descriptions are basically adaptable to a broader-based program incorporating additional or different Spacelab/orbiter payloads.
River Protection Project (RPP) Dangerous Waste Training Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
POHTO, R.E.
2000-03-09
This supporting document contains the training plan for dangerous waste management at River Protection Project TSD Units. This document outlines the dangerous waste training program developed and implemented for all Treatment, Storage, and Disposal (TSD) Units operated by River Protection Project (RPP) in the Hanford 200 East, 200 West and 600 Areas and the <90 Day Accumulation Area at 209E. Operating TSD Units managed by RPP are: the Double-Shell Tank (DST) System, 204-AR Waste Unloading Facility, Grout, and the Single-Shell Tank (SST) System. The program is designed in compliance with the requirements of Washington Administrative Code (WAC) 173-303-330 and Titlemore » 40 Code of Federal Regulations (CFR) 265.16 for the development of a written dangerous waste training program and the Hanford Facility Permit. Training requirements were determined by an assessment of employee duties and responsibilities. The RPP training program is designed to prepare employees to operate and maintain the Tank Farms in a safe, effective, efficient, and environmentally sound manner. In addition to preparing employees to operate and maintain the Tank Farms under normal conditions, the training program ensures that employees are prepared to respond in a prompt and effective manner should abnormal or emergency conditions occur. Emergency response training is consistent with emergency responses outlined in the following Building Emergency Plans: HNF-IP-0263-TF and HNF-=IP-0263-209E.« less
Mod-2 wind turbine system cluster research test program. Volume 1: Initial plan E-1290
NASA Technical Reports Server (NTRS)
Gordon, L. H.
1982-01-01
Upon completion of the design and development of three Mod-2 wind turbines, a series of research experiments are planned to gather data on and evaluate the performance, environmental effects, and operation of a cluster as well as a single, large multimegawatt wind turbine. Information on the program objectives, a Mod-2 system description, a planned schedule, organizational roles, and responsibilities, is included.
2006-07-26
FY2008. Although the Navy’s proposed force of 31 amphibious ships includes 10 LPD-17 class ships, the Navy is planning to end LPD-17 procurement in...expresses concerns about the planned reduction in amphibious ships, the sea basing concept, and the MPF(F) program, and requires a report on sea basing...Ship Force Structure Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Sea Basing Concept of Operations
The plan for the economic evaluation of the Public Service Communication Satellite system
NASA Technical Reports Server (NTRS)
1977-01-01
A total plan for the economic evaluation of the PSCS public service communication satellite program within domestic markets is presented. It extends from the present through the planning, performance and evaluation of economic experiments following the launch of the PSCS, and includes the consideration of how the results of these experiments impact the transfer from demonstration to operations. The implementation of this plan will provide NASA with information needed to understand and manage the economic and social impacts of the PSCS program.
Underground storage tank management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-09-01
The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective actionmore » is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.« less
Access 5 - Step 1: Human Systems Integration Program Plan (HSIPP)
NASA Technical Reports Server (NTRS)
2005-01-01
This report describes the Human System Interface (HSI) analysis, design and test activities that will be performed to support the development of requirements and design guidelines to facilitate the incorporation of High Altitude Long Endurance (HALE) Remotely Operated Aircraft (ROA) at or above FL400 in the National Airspace System (NAS). These activities are required to support the design and development of safe, effective and reliable ROA operator and ATC interfaces. This plan focuses on the activities to be completed for Step 1 of the ACCESS 5 program. Updates to this document will be made for each of the four ACCESS 5 program steps.
30 CFR 780.4 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.4...
30 CFR 784.4 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.4...
Code of Federal Regulations, 2010 CFR
2010-07-01
... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.29...
Code of Federal Regulations, 2010 CFR
2010-07-01
... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.2...
12 CFR 614.4165 - Young, beginning, and small farmers and ranchers.
Code of Federal Regulations, 2010 CFR
2010-01-01
... association in writing. (e) YBS program and the operational and strategic business plan. Targets and goals...'s operational and strategic business plan for at least the succeeding 3 years (as set forth in § 618... performance results, and YBS quarterly reporting to the association's board of directors. [69 FR 16470, Mar...
40 CFR 141.804 - Aircraft water system operations and maintenance plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Aircraft water system operations and maintenance plan. 141.804 Section 141.804 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Aircraft Drinking Water Rule § 141.804 Aircraft water system...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-12
... Operating Licenses include: (1) The proposed Cyber Security Plan for CCNPP, Ginna, and NMPNS, (2) an... provisions of the Nuclear Regulatory Commission-approved Cyber Security Plan for CCNPP, Ginna, and NMPNS as... Communication Systems and Networks,'' establish the requirements for a cyber security program. This regulation...
Radiological Defense. Planning and Operations Guide. Revised.
ERIC Educational Resources Information Center
Office of Civil Defense (DOD), Washington, DC.
This guide is a reprint of published and draft materials from the Federal Civil Defense Guide. This guide is intended to assist the student in planning, developing, implementing and operating a local, county, or state radiological defense (RADEF) system. The state and local radiological defense program objectives are to create an effective and…
Configuration Management Plan for K Basins
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weir, W.R.; Laney, T.
This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less
NASA Technical Reports Server (NTRS)
Greenberg, J. S.; Miller, B. P.
1979-01-01
The feasibility of applying strategic business planning techniques which are developed and used in the private sector to the planning of certain projects within the NASA Office of Space and Terrestrial Applications was assessed. The methods of strategic business planning that are currently in use in the private sector are examined. The typical contents of a private sector strategic business plan and the techniques commonly used to develop the contents of the plan are described, along with modifications needed to apply these concepts to public sector projects. The current long-range planning process in the Office of Space and Terrestrial Applications is reviewed and program initiatives that might be candidates for the use of strategic business planning techniques are identified. In order to more fully illustrate the information requirements of a strategic business plan for a NASA program, a sample business plan is prepared for a hypothetical Operational Earth Resources Satellite program.
A Comprehensive Planning Model and Delivery System for Leadership Training Programs.
ERIC Educational Resources Information Center
Janosik, Steven M.; Sina, Julie A.
1988-01-01
Presents an eight-step planning model that operationally defines a comprehensive delivery systems approach to campuswide leadership training. Lists four goals of the model: to increase efficiency of leadership training through shared resources, to decrease costs, to provide quality control, and to increase impact of programming effort by creating…
Detailed Test Plan Redundant Sensor Strapdown IMU Evaluation Program
NASA Technical Reports Server (NTRS)
Hartwell, T.; Miyatake, Y.; Wedekind, D. E.
1971-01-01
The test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The subjects discussed are: (1) test philosophy and limitations, (2) test sequence, (3) equipment specifications, (4) general operating procedures, (5) calibration procedures, (6) alignment test phase, and (7) navigation test phase. The data and analysis requirements are analyzed.
40 CFR 96.284 - Opt-in process.
Code of Federal Regulations, 2010 CFR
2010-07-01
... TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR SO2 Opt-in Units... of interim review, if the plan appears to contain information demonstrating that the SO2 emissions... section, the owner or operator shall monitor and report the SO2 emissions rate and the heat input of the...
14 CFR Appendix B to Part 150 - Noise Compatibility Programs
Code of Federal Regulations, 2014 CFR
2014-01-01
... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...
14 CFR Appendix B to Part 150 - Noise Compatibility Programs
Code of Federal Regulations, 2010 CFR
2010-01-01
... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...
14 CFR Appendix B to Part 150 - Noise Compatibility Programs
Code of Federal Regulations, 2013 CFR
2013-01-01
... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...
14 CFR Appendix B to Part 150 - Noise Compatibility Programs
Code of Federal Regulations, 2011 CFR
2011-01-01
... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...
14 CFR Appendix B to Part 150 - Noise Compatibility Programs
Code of Federal Regulations, 2012 CFR
2012-01-01
... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...
Why Linking Budgets to Plans Has Proven Difficult in Higher Education.
ERIC Educational Resources Information Center
Schmidtlein, Frank A.
1990-01-01
Conclusions from two studies (including a three-year nationwide study of higher education institutional planning) concern types of planning (strategic, program, facility, operational, budget, and issue-specific), and limitations (the limited powers of prediction and the political character of planning and budgeting). Types of budgeting processes…
75 FR 10328 - Wolf Creek Nuclear Operating Corporation, Wolf Creek Generating Station; Exemption
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-05
... Plan, Safeguards Contingency Plan, and Cyber Security Plan referred to collectively hereafter as... its security plans. Pursuant to 10 CFR 51.32, ``Finding of no significant impact,'' the Commission has... by designing and implementing comprehensive site security programs. The amendments to 10 CFR 73.55...
42 CFR 495.326 - Disallowance of FFP.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., requirements, and other undertakings described in the approved HIT planning advance planning document and HIT implementation advance planning document to the detriment of the proper and efficient operation of the Medicaid program, payment of FFP may be disallowed. In the case of a suspension of approval of a HIT planning...
32 CFR 813.6 - Planning and requesting combat documentation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Joint Operation Planning and Execution System, that in turn, requests support from HQ AMC. HQ USAF can... 32 National Defense 6 2010-07-01 2010-07-01 false Planning and requesting combat documentation... SALES AND SERVICES VISUAL INFORMATION DOCUMENTATION PROGRAM § 813.6 Planning and requesting combat...
ERIC Educational Resources Information Center
Mercado del Collado, Ricardo
Higher education planning in Mexico is discussed, with attention to: conceptual characteristics of Mexico's higher education planning system; relationships among the national, regional, state, and institutional planning levels; and design and operation of the Comprehensive Program for the Development of Higher Education. Responsibilities of…
LISPA (Library and Information Center Staff Planning Advisor): A Microcomputer-Based System.
ERIC Educational Resources Information Center
Devadason, F. J.; Vespry, H. A.
1996-01-01
Describes LISPA (Library and Information Center Staff Planning Advisor), a set of programs based on Ranganathan's staff plan model. LISPA particularly aids in planning for library staff requirements, both professional and paraprofessional, in developing countries where automated systems for other library operations are not yet available.…
Institutional Long Range Planning.
ERIC Educational Resources Information Center
Caldwell Community Coll. and Technical Inst., Lenoir, NC.
Long-range institutional planning has been in effect at Caldwell Community College and Technical Institute since 1973. The first step in the process was the identification of planning areas: administration, organization, educational programs, learning resources, student services, faculty, facilities, maintenance/operation, and finances. The major…
7 CFR 761.104 - Developing the farm operating plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS GENERAL PROGRAM ADMINISTRATION Supervised Credit § 761.104... following priorities: (i) The applicant or borrower's own production records for the previous 3 years; (ii) The per-acre actual production history of the crops produced by the farming operation used to...
Operations planning and analysis handbook for NASA/MSFC phase B development projects
NASA Technical Reports Server (NTRS)
Batson, Robert C.
1986-01-01
Current operations planning and analysis practices on NASA/MSFC Phase B projects were investigated with the objectives of (1) formalizing these practices into a handbook and (2) suggesting improvements. The study focused on how Science and Engineering (S&E) Operational Personnel support Program Development (PD) Task Teams. The intimate relationship between systems engineering and operations analysis was examined. Methods identified for use by operations analysts during Phase B include functional analysis, interface analysis methods to calculate/allocate such criteria as reliability, Maintainability, and operations and support cost.
Code of Federal Regulations, 2010 CFR
2010-07-01
... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.29 Diversions...
Code of Federal Regulations, 2010 CFR
2010-07-01
... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.2 Objectives...
Shediac-Rizkallah, M C; Bone, L R
1998-03-01
Attention to the sustainability of health intervention programs both in the US and abroad is increasing, but little consensus exists on the conceptual and operational definitions of sustainability. Moreover, an empirical knowledge base about the determinants of sustainability is still at an early stage. Planning for sustainability requires, first, a clear understanding of the concept of sustainability and operational indicators that may be used in monitoring sustainability over time. Important categories of indicators include: (1) maintenance of health benefits achieved through an initial program, (2) level of institutionalization of a program within an organization and (3) measures of capacity building in the recipient community. Second, planning for sustainability requires the use of programmatic approaches and strategies that favor long-term program maintenance. We suggest that the potential influences on sustainability may derive from three major groups of factors: (1) project design and implementation factors, (2) factors within the organizational setting, and (3) factors in the broader community environment. Future efforts to develop sustainable health intervention programs in communities can build on the concepts and strategies proposed here.
Simmons, R; Phillips, J F; Rahman, M
1984-01-01
An ongoing study at the International Centre for Diarrhoeal Disease Research, Bangladesh (ICDDR,B) is based on the premise that public sector health and family planning programs can be improved through an assessment of the dysfunctional aspects of their operations, the development of problem-solving capabilities, and the transfer of strategies successfully tested in a small-scale pilot project. This paper reports findings from a field trial implemented in a subunit of the project area at an early stage of the project. Operational barriers to public sector program implementation are discussed with regard to the quantity of work, the quality of work, supplies and facilities, integration of health and family planning, and leadership, supervision, and decision making. Initial results of the ICDDR,B intervention on these managerial processes are also indicated.
NASA Technical Reports Server (NTRS)
1988-01-01
This Preliminary Project Implementation Plan (PPIP) was used to examine the feasibility of replacing the current Solid Rocket Boosters on the Space Shuttle with Liquid Rocket Boosters (LRBs). The need has determined the implications of integrating the LRB with the Space Transportation System as the earliest practical date. The purpose was to identify and define all elements required in a full scale development program for the LRB. This will be a reference guide for management of the LRB program, addressing such requirement as design and development, configuration management, performance measurement, manufacturing, product assurance and verification, launch operations, and mission operations support.
Using operations research to plan the british columbia registered nurses' workforce.
Lavieri, Mariel S; Regan, Sandra; Puterman, Martin L; Ratner, Pamela A
2008-11-01
The authors explore the power and flexibility of using an operations research methodology known as linear programming to support health human resources (HHR) planning. The model takes as input estimates of the future need for healthcare providers and, in contrast to simulation, compares all feasible strategies to identify a long-term plan for achieving a balance between supply and demand at the least cost to the system. The approach is illustrated by using it to plan the British Columbia registered nurse (RN) workforce over a 20-year horizon. The authors show how the model can be used for scenario analysis by investigating the impact of decreasing attrition from educational programs, changing RN-to-manager ratios in direct care and exploring how other changes might alter planning recommendations. In addition to HHR policy recommendations, their analysis also points to new research opportunities. Copyright © 2008 Longwoods Publishing.
Summary of NASA-Lewis Research Center solar heating and cooling and wind energy programs
NASA Technical Reports Server (NTRS)
Vernon, R. W.
1975-01-01
NASA is planning to construct and operate a solar heating and cooling system in conjunction with a new office building being constructed at Langley Research Center. The technology support for this project will be provided by a solar energy program underway at NASA's Lewis Research Center. The solar program at Lewis includes: testing of solar collectors with a solar simulator, outdoor testing of collectors, property measurements of selective and nonselective coatings for solar collectors, and a solar model-systems test loop. NASA-Lewis has been assisting the National Science Foundation and now the Energy Research and Development Administration in planning and executing a national wind energy program. The areas of the wind energy program that are being conducted by Lewis include: design and operation of a 100 kW experimental wind generator, industry-designed and user-operated wind generators in the range of 50 to 3000 kW, and supporting research and technology for large wind energy systems. An overview of these activities is provided.
1989-01-01
managerial areas , including: management and control of the operational requirements of the NAS F& E Plan; preparation, management, and control of the annual... areas (capacity, safety, security, and efficiency), highlights of key programs, and a discussion of the relationships of the RE&D Plan to the NAS F& E ...release of SUA , such as restricted airspace and military operations areas , are currently limited by several factors, including manual interagency
LANDSAT-D Mission Operations Review (MOR)
NASA Technical Reports Server (NTRS)
1982-01-01
The integrated LANDSAT-D systems operation plan is presented and discussed with respect to functional elements, personnel, and procedures. Specifically, a review of the LANDSAT-D program, mission requirements and management, and flight operations is given.
ERIC Educational Resources Information Center
Miller, Catherine M., Ed.; Chief, Elizabeth H., Ed.
This program guide covers in outline form the characteristics of state public assistance plans for operating programs of Aid to Families with Dependent Children. The information for each state is presented in a series of pages with four subdivisions: Administration, Eligibility Requirements, Need Determination, and Extension of the Program. In…
General test plan redundant sensor strapdown IMU evaluation program
NASA Technical Reports Server (NTRS)
Hartwell, T.; Irwin, H. A.; Miyatake, Y.; Wedekind, D. E.
1971-01-01
The general test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The inertial unit contains six gyros and three orthogonal accelerometers. The software incorporates failure detection and correction logic and a land vehicle navigation program. The principal objective of the test is a demonstration of the practicability, reliability, and performance of the inertial measuring unit with failure detection and correction in operational environments.
DOT National Transportation Integrated Search
2016-08-01
The Participant Training and Stakeholder Education Plan is a high-level plan for the recruitment and training of all automobile drivers, pedestrians, transit drivers, traffic management center (TMC) operators, and installation and maintenance technic...
Strategic planning: the first step in the planning process.
Gelinas, Marc A
2003-01-01
Strategic planning is a systematic process through which an organization builds commitment among key stakeholders to goals and priorities which are essential to its mission and vision, and responsive to the operating environment. Strategic planning is the first step in a comprehensive planning process that also includes business planning and implementation planning. If all three steps are carried out in sequence, strategic planning can be a very effective means of educating the stakeholders about where the cancer program is and where it is going, gaining support and commitment for the direction that the cancer program will take, and assuring that everyone's expectations can be managed effectively. Unfortunately, some organizations and cancer program leaders misunderstand the process. Too often, strategic planning is used as a stand-alone activity. This article will describe what strategic planning is, how it should smoothly lead into business planning and implementation planning, and how to avoid the pitfalls that sometimes arise during the strategic planning effort.
DOT National Transportation Integrated Search
2013-06-01
The North Carolina Level of Service (NCLOS) program is a planning-level highway capacity analysis tool : developed for NCDOT under a previous project. The program uses the operational methodologies in the 2010 : Highway Capacity Manual (HCM), along w...
FY 95 engineering work plan for the design reconstitution implementation action plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bigbee, J.D.
Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less
A case study in programming a quantum annealer for hard operational planning problems
NASA Astrophysics Data System (ADS)
Rieffel, Eleanor G.; Venturelli, Davide; O'Gorman, Bryan; Do, Minh B.; Prystay, Elicia M.; Smelyanskiy, Vadim N.
2015-01-01
We report on a case study in programming an early quantum annealer to attack optimization problems related to operational planning. While a number of studies have looked at the performance of quantum annealers on problems native to their architecture, and others have examined performance of select problems stemming from an application area, ours is one of the first studies of a quantum annealer's performance on parametrized families of hard problems from a practical domain. We explore two different general mappings of planning problems to quadratic unconstrained binary optimization (QUBO) problems, and apply them to two parametrized families of planning problems, navigation-type and scheduling-type. We also examine two more compact, but problem-type specific, mappings to QUBO, one for the navigation-type planning problems and one for the scheduling-type planning problems. We study embedding properties and parameter setting and examine their effect on the efficiency with which the quantum annealer solves these problems. From these results, we derive insights useful for the programming and design of future quantum annealers: problem choice, the mapping used, the properties of the embedding, and the annealing profile all matter, each significantly affecting the performance.
NASA Technical Reports Server (NTRS)
Hamilton, M. H.
1972-01-01
Erasable-memory programs designed for guidance computers used in command and lunar modules are presented. The purpose, functional description, assumptions, restrictions, and imitations are given for each program.
7 CFR 1469.23 - Program payments.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS CONSERVATION SECURITY PROGRAM Contracts and Payments § 1469.23 Program payments. (a) Stewardship component of CSP payments. (1) The conservation stewardship plan... Agriculture Statistics Service (NASS) land rental data, and Conservation Reserve Program (CRP) rental rates...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Amendment of Spill Prevention, Control, and Countermeasure Plan by owners or operators. 112.5 Section 112.5 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Applicability, Definitions, and General Requirements for All...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Amendment of Spill Prevention, Control, and Countermeasure Plan by owners or operators. 112.5 Section 112.5 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Applicability, Definitions, and General Requirements for All Facilitie...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Amendment of Spill Prevention, Control, and Countermeasure Plan by owners or operators. 112.5 Section 112.5 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Applicability, Definitions, and General Requirements for All...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Amendment of Spill Prevention, Control, and Countermeasure Plan by owners or operators. 112.5 Section 112.5 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Applicability, Definitions, and General Requirements for All...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Amendment of Spill Prevention, Control, and Countermeasure Plan by owners or operators. 112.5 Section 112.5 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Applicability, Definitions, and General Requirements for All...
Code of Federal Regulations, 2011 CFR
2011-07-01
..., pension plan costs, post-retirement health benefits, employee life insurance, unemployment benefit plans... used to promote or maintain a favorable image of the guaranty agency. The term “public relations” does... relations activities include training of program participants and secondary school personnel and customer...
Reducing environmental noise impacts: A USAREUR noise management program handbook
NASA Astrophysics Data System (ADS)
Feather, Timothy D.; Shekell, Ted K.
1991-06-01
Noise pollution is a major environmental problem faced by the U.S. Army in Europe. Noise-related complaints from German citizens can escalate into intense political issues in German communities. This in turn hampers efficient operation of military training and often times threatens the Army's mission. In order to remedy these problems, USAREUR has developed a noise management program. A successful noise management program will limit the impact of unavoidable noise on the populace. This report, a component of the noise management program, is a reference document for noise management planning. It contains guidelines and rules-of-thumb for noise management. This document contains procedures which operation and training level personnel can understand and apply in their day to day noise management planning. Noise mitigation tips are given. Basic technical information that will aid in understanding noise mitigation is provided along with noise management through land use planning. Noise management for specific components of the military community, (airfields, base operations, training areas, and housing and recreation areas) are addressed. The nature of noise generated, means of noise abatement at the source, path, and receiver (both physical and organizational/public relations methods), and a case study example are described.
NASA's Airborne Astronomy Program - Lessons For SOFIA
NASA Astrophysics Data System (ADS)
Erickson, Edwin F.
2007-07-01
Airborne astronomy was pioneered and has evolved at NASA Ames Research Center near San Francisco, California, since 1965. Nowhere else in the world has a similar program been implemented. Its many unique features deserve description, especially for the benefit of planning the operation of SOFIA, the Stratospheric Observatory for Infrared Astronomy, and in particular since NASA Headquarters’ recent decision to base SOFIA operations at Dryden Flight Research Center at Edwards, California instead of at Ames. The history of Ames’ airborne astronomy program is briefly summarized. Discussed in more detail are the operations and organization of the 21-year Kuiper Airborne Observatory (KAO) program, which provide important lessons for SOFIA. The KAO program is our best prototype for planning effective SOFIA operations. Principal features of the KAO program which should be retained on SOFIA are: unique science, innovative new science instruments and technologies, training of young scientists, an effective education and public outreach program, flexibility, continuous improvement, and efficient operations with a lean, well integrated team. KAO program features which should be improved upon with SOFIA are: (1) a management structure that is dedicated primarily to safely maximizing scientific productivity for the resources available, headed by a scientist who is the observatory director, and (2) stimuli to assure prompt distribution and accessibility of data to the scientific community. These and other recommendations were recorded by the SOFIA Science Working Group in 1995, when the KAO was decommissioned to start work on SOFIA. Further operational and organizational factors contributing to the success of the KAO program are described. Their incorporation into SOFIA operations will help assure the success of this new airborne observatory. SOFIA is supported by NASA in the U.S. and DLR (the German Aerospace Center) in Germany.
State Vocational Education Planning: An Assessment of Issues and Problems.
ERIC Educational Resources Information Center
Lawrence, John E. S., Ed.; Dane, J. K., Ed.
The Dynamic Analysis and Strategic Planning (DASP) Program Division of the Center for Occupational Education at North Carolina State University is concerned with its need for information about the actual operation of planning systems and the development of a planning and information system for vocational education. To this end a three part…
ERIC Educational Resources Information Center
Kraft, Donald H.; Liesener, James W.
1979-01-01
Presents an analysis of problems of resource allocation in the school library and a practical operations research approach toward accountability. Four planning instruments are included in the solution procedure: inventory of services; preference form; data collection guide; and program costing matrix. (Author/MBR)
Race-Neutral Campuses in Urban Areas: A Follow-Up Report on Merger and Joint Planning.
ERIC Educational Resources Information Center
Godard, James M.
Developments during the 1980-81 academic year concerning mergers/joint planning projects designed to eliminate unnecessary duplication of programs between historically black and white colleges in Nashville, Tennessee; Savannah, Georgia; and Norfolk, Virginia are examined. Site visits were made during the second year of operation of the programs at…
ERIC Educational Resources Information Center
Wholeben, Brent Edward
A rationale is presented for viewing the decision-making process inherent in determining budget reductions for educational programs as most effectively modeled by a graduated funding approach. The major tenets of the graduated budget reduction approach to educational fiscal policy include the development of multiple alternative reduction plans, or…
Pathways to Practice. A Series of Final Reports on the SREB Nursing Curriculum Project.
ERIC Educational Resources Information Center
Haase, Patricia T.
Five final reports on the Nursing Curriculum Project of the Southern Regional Education Board are presented. The reports include (1) RN (Registered Nursing) Education: The Basic Issues; (2) Types of RN Programs; (3) Planning and Operating an RN Program; (4) Acclimating the Novice Nurse: Whose Responsibility? and (5) Statewide Planning for Nursing.…
75 FR 9103 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; NOX
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-01
... State Implementation Plan (SIP) that would terminate the provisions of the Nitrogen Oxides (NO X ) Budget Trading Program that apply to electric generating units. EPA is no longer operating the NO X Budget Trading Program as a compliance option under the NO X SIP Call. These sources are now subject to...
75 FR 9146 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; NOX
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-01
... Illinois State Implementation Plan (SIP) that would terminate the provisions of the Nitrogen Oxides (NO X ) Budget Trading Program that apply to electric generating units. EPA is no longer operating the NO X Budget Trading Program as a compliance option under the NO X SIP Call. These sources are now subject to...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...
44 CFR 302.3 - Documentation of eligibility.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS CIVIL DEFENSE-STATE AND LOCAL EMERGENCY MANAGEMENT ASSISTANCE... administrative plan, an emergency operations plan for civil defense, and an annual submission (including a... national plan (i.e., program) for civil defense and as meeting the requirements of the regulations in this...
44 CFR 302.3 - Documentation of eligibility.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS CIVIL DEFENSE-STATE AND LOCAL EMERGENCY MANAGEMENT ASSISTANCE... administrative plan, an emergency operations plan for civil defense, and an annual submission (including a... national plan (i.e., program) for civil defense and as meeting the requirements of the regulations in this...
44 CFR 302.3 - Documentation of eligibility.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS CIVIL DEFENSE-STATE AND LOCAL EMERGENCY MANAGEMENT ASSISTANCE... administrative plan, an emergency operations plan for civil defense, and an annual submission (including a... national plan (i.e., program) for civil defense and as meeting the requirements of the regulations in this...
44 CFR 302.3 - Documentation of eligibility.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS CIVIL DEFENSE-STATE AND LOCAL EMERGENCY MANAGEMENT ASSISTANCE... administrative plan, an emergency operations plan for civil defense, and an annual submission (including a... national plan (i.e., program) for civil defense and as meeting the requirements of the regulations in this...
44 CFR 302.3 - Documentation of eligibility.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS CIVIL DEFENSE-STATE AND LOCAL EMERGENCY MANAGEMENT ASSISTANCE... administrative plan, an emergency operations plan for civil defense, and an annual submission (including a... national plan (i.e., program) for civil defense and as meeting the requirements of the regulations in this...
29 CFR 1952.313 - Final approval determination.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 1902. Accordingly, the Hawaii plan was granted final approval and concurrent Federal enforcement... employment in Hawaii. The plan does not cover maritime employment in the private sector; Federal government... effective as operations under the Federal program; to submit plan supplements in accordance with 29 CFR part...
Ground based simulation of life sciences Spacelab experiments
NASA Technical Reports Server (NTRS)
Rummel, J. A.; Alexander, W. C.; Bush, W. H.; Johnston, R. S.
1978-01-01
The third in a series of Spacelab Mission Development tests was a joint effort of the Ames Research and Johnson Space Centers to evaluate planned operational concepts of the Space Shuttle life sciences program. A three-man crew conducted 26 experiments and 12 operational tests, utilizing both human and animal subjects. The crew lived aboard an Orbiter/Spacelab mockup for the seven-day simulation. The Spacelab was identical in geometry to the European Space Agency design, complete with removable rack sections and stowage provisions. Communications were controlled as currently planned for operational Shuttle flights. A Science Operations Remote Center at the Ames Research Center was managed by simulated Mission Control and Payload Operation Control Centers at the Johnson Space Center. This paper presents the test objectives, describes the facilities and test program, and outlines the results of this test.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schaus, P.S.
This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.
NASA Technical Reports Server (NTRS)
1984-01-01
The structure of the program, the five priority levels, the drive routines, the stepwise drive plan, the figure routines, meander X and y, the range of measurement table, the optimization of figure drive, the figure drive plan, dialogue routines, stack processing, the drive for the main terminal, the protocol routines, the drive for the microterminal, the drive for the experiment computer, and the main program are discussed.
Space Shuttle operational logistics plan
NASA Technical Reports Server (NTRS)
Botts, J. W.
1983-01-01
The Kennedy Space Center plan for logistics to support Space Shuttle Operations and to establish the related policies, requirements, and responsibilities are described. The Directorate of Shuttle Management and Operations logistics responsibilities required by the Kennedy Organizational Manual, and the self-sufficiency contracting concept are implemented. The Space Shuttle Program Level 1 and Level 2 logistics policies and requirements applicable to KSC that are presented in HQ NASA and Johnson Space Center directives are also implemented.
Y-12 Site environmental protection program implementation plan (EPPIP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-11-01
The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirementsmore » for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.« less
Economic Justification for FAA's Flight 2000 Program
DOT National Transportation Integrated Search
1997-09-23
This paper summarizes the economic benefits that are anticipated to flow from : the FAA's Flight 2000 operational demonstration program. This quick assessment : is based on the Flight 2000 Initial Program Plan, dated July 16, 1997. The : analysis sho...
Environmental Improvement in Mexico
ERIC Educational Resources Information Center
Environmental Science and Technology, 1976
1976-01-01
Working with the United Nations Development Program, the Mexican government's Program for Environmental Improvement is planning, coordinating, operating and monitoring pollution abatement programs in the areas of air, water, solid waste and pesticides. A brief discussion of activities is given. (BT)
EPA OIG Strategic Plan for 2012 - 2016
We plan our work with the goals of influencing resolution of the EPA’s major management challenges, reducing risk, improving program operations, and saving taxpayer dollars, leading to positive human health and environmental impacts.
Space human factors discipline science plan
NASA Technical Reports Server (NTRS)
1991-01-01
The purpose of this Discipline Science Plan is to provide a conceptual strategy for NASA's Life Sciences Division research and development activities in the comprehensive areas of behavior, performance, and human factors. This document summarizes the current status of the program, outlines available knowledge, establishes goals and objectives, defines critical questions in the subdiscipline areas, and identifies technological priorities. It covers the significant research areas critical to NASA's programmatic requirements for the Extended Duration Orbiter, Space Station Freedom, and Exploration mission science activities. These science activities include ground-based and flight; basic, applied and operational; and animal and human research and development. This document contains a general plan that will be used by both NASA Headquarters program offices and the field centers to review and plan basic, applied, and operational research and development activities, both intramural and extramural, in this area.
A Variable Flow Modelling Approach To Military End Strength Planning
2016-12-01
programming MAPE mean average percentage error MLRPS Manpower Long-Range Planning System MT marine technician OR operations research RAN Royal...OR Practice—The Army Manpower Long-Range Planning System. Operations Research , 36(1), 5–17. http://dx.doi.org/10.1287/opre.36.1.5 Guerry, M. A...unlimited. 12b. DISTRIBUTION CODE 13. ABSTRACT (maximum 200 words) The purpose of this thesis is to develop a model to assist military manpower planners in
Metal Fabrication. Florida Vocational Program Guide.
ERIC Educational Resources Information Center
University of South Florida, Tampa. Dept. of Adult and Vocational Education.
This guide identifies considerations in the organization, operation, and evaluation of secondary and postsecondary vocational education programs. It contains both a vocational program guide and Career Merit Achievement Plan (Career MAP) for metal fabrication. The guide contains the following sections: occupational description; program content…
ERIC Educational Resources Information Center
Chase, William W.
Brief descriptions are presented of a number of Office of Education federal funding programs directly supporting educational facilities planning and construction. Programs now in operation and several currently under consideration are pointed out. Consideration is also given to several programs in federal agencies other than the Office of…
Innovations for ISS Plug-In Plan (IPiP) Operations
NASA Technical Reports Server (NTRS)
Moore, Kevin D.
2013-01-01
Limited resources and increasing requirements will continue to influence decisions on ISS. The ISS Plug-In Plan (IPiP) supports power and data for utilization, systems, and daily operations through the Electrical Power System (EPS) Secondary Power/Data Subsystem. Given the fluid launch schedule, the focus of the Plug-In Plan has evolved to anticipate future requirements by judicious development and delivery of power supplies, power strips, Alternating Current (AC) power inverters, along with innovative deployment strategies. A partnership of ISS Program Office, Engineering Directorate, Mission Operations, and International Partners poses unique solutions with existing on-board equipment and resources.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-29
...: EPA is approving revisions to the Puerto Rico Regulations for the Control of Atmospheric Pollution, submitted to EPA by the Puerto Rico Environmental Quality Board on July 13, 2011. This action approves... of Puerto Rico's Title V Operating Program. Generally the revisions to the regulations involve...
THE WASHINGTON DATA PROCESSING TRAINING STORY.
ERIC Educational Resources Information Center
MCKEE, R.L.
A DATA PROCESSING TRAINING PROGRAM IN WASHINGTON HAD 10 DATA PROCESSING CENTERS IN OPERATION AND EIGHT MORE IN VARIOUS STAGES OF PLANNING IN 1963. THESE CENTERS WERE FULL-TIME DAY PREPARATORY 2-YEAR POST-HIGH SCHOOL TECHNICIAN TRAINING PROGRAMS, OPERATED AND ADMINISTERED BY THE LOCAL BOARDS OF EDUCATION. EACH SCHOOL HAD A COMPLETE DATA PROCESSING…
50 CFR 679.84 - Rockfish Program recordkeeping, permits, monitoring, and catch accounting.
Code of Federal Regulations, 2013 CFR
2013-10-01
... must be within or adjacent to the observer sample station. (7) Pre-cruise meeting. The Observer Program... arrange for a pre-cruise meeting. The pre-cruise meeting must minimally include the vessel operator or... shoreside processors—(1) Catch monitoring and control plan (CMCP). The owner or operator of a shoreside...
50 CFR 679.84 - Rockfish Program recordkeeping, permits, monitoring, and catch accounting.
Code of Federal Regulations, 2014 CFR
2014-10-01
... must be within or adjacent to the observer sample station. (7) Pre-cruise meeting. The Observer Program... arrange for a pre-cruise meeting. The pre-cruise meeting must minimally include the vessel operator or... shoreside processors—(1) Catch monitoring and control plan (CMCP). The owner or operator of a shoreside...
50 CFR 679.84 - Rockfish Program recordkeeping, permits, monitoring, and catch accounting.
Code of Federal Regulations, 2012 CFR
2012-10-01
... must be within or adjacent to the observer sample station. (7) Pre-cruise meeting. The Observer Program... arrange for a pre-cruise meeting. The pre-cruise meeting must minimally include the vessel operator or... shoreside processors—(1) Catch monitoring and control plan (CMCP). The owner or operator of a shoreside...
Supporting Studies on QDRI Project Plan. Report No. 2. Conversion Procedures for Automation.
ERIC Educational Resources Information Center
Peirce, James G.; And Others
This report describes the tasks and related efforts necessary to convert the present Qualitative Developments Requirements Information (QDRI) Program from a clerical operation into an automated information processing system. A description of the QDRI Program is presented whereby current operations, files, procedures, etc. are contrasted to planned…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hague, J.
This program relates to demonstration use of electric-powered vehicles. KSU has two electric cars (conversion vehicles) from Soleq. Corp., and is purchasing 4 Chevy trucks for conversion. This document discusses the participating groups, program plan, events, vehicles and components, operations, and procurement.
49 CFR 199.202 - Alcohol misuse plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 3 2011-10-01 2011-10-01 false Alcohol misuse plan. 199.202 Section 199.202... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Alcohol Misuse Prevention Program § 199.202 Alcohol misuse plan. Each operator must maintain and follow a written alcohol...
49 CFR 199.202 - Alcohol misuse plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 3 2010-10-01 2010-10-01 false Alcohol misuse plan. 199.202 Section 199.202... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY DRUG AND ALCOHOL TESTING Alcohol Misuse Prevention Program § 199.202 Alcohol misuse plan. Each operator must maintain and follow a written alcohol...
Ryan, Jason C; Banerjee, Ashis Gopal; Cummings, Mary L; Roy, Nicholas
2014-06-01
Planning operations across a number of domains can be considered as resource allocation problems with timing constraints. An unexplored instance of such a problem domain is the aircraft carrier flight deck, where, in current operations, replanning is done without the aid of any computerized decision support. Rather, veteran operators employ a set of experience-based heuristics to quickly generate new operating schedules. These expert user heuristics are neither codified nor evaluated by the United States Navy; they have grown solely from the convergent experiences of supervisory staff. As unmanned aerial vehicles (UAVs) are introduced in the aircraft carrier domain, these heuristics may require alterations due to differing capabilities. The inclusion of UAVs also allows for new opportunities for on-line planning and control, providing an alternative to the current heuristic-based replanning methodology. To investigate these issues formally, we have developed a decision support system for flight deck operations that utilizes a conventional integer linear program-based planning algorithm. In this system, a human operator sets both the goals and constraints for the algorithm, which then returns a proposed schedule for operator approval. As a part of validating this system, the performance of this collaborative human-automation planner was compared with that of the expert user heuristics over a set of test scenarios. The resulting analysis shows that human heuristics often outperform the plans produced by an optimization algorithm, but are also often more conservative.
NASA Technical Reports Server (NTRS)
Koenig, D. G.
1984-01-01
Factors influencing effective program planning for V/STOL wind-tunnel testing are discussed. The planning sequence itself, which includes a short checklist of considerations that could enhance the value of the tests, is also described. Each of the considerations, choice of wind tunnel, type of model installation, model development and test operations, is discussed, and examples of appropriate past and current V/STOL test programs are provided. A short survey of the moderate to large subsonic wind tunnels is followed by a review of several model installations, from two-dimensional to large-scale models of complete aircraft configurations. Model sizing, power simulation, and planning are treated, including three areas is test operations: data-acquisition systems, acoustic measurements in wind tunnels, and flow surveying.
An Operational Safety and Health Program.
ERIC Educational Resources Information Center
Uhorchak, Robert E.
1983-01-01
Describes safety/health program activities at Research Triangle Institute (North Carolina). These include: radioisotope/radiation and hazardous chemical/carcinogen use, training, monitoring, disposal; chemical waste management; air monitoring and analysis; medical program; fire safety/training, including emergency planning; Occupational Safety and…
Starting a Planned Maintenance Program on a Shoestring
ERIC Educational Resources Information Center
Adams, Matt
2013-01-01
This article addresses two of the most repeated questions in APPA (1) How can we convert our reactive maintenance operations to a planned and predictable operation? and (2) In addition, how can we do this with little or no additional resources? It seems reasonable to assume that if a department is short on resources and in a full-blown reactive…
Oil prospects attract workover dollars. [Rocky Mountains
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stremel, K.
1983-12-01
Anticipating stable crude oil prices and low service costs, Rocky Mountain operators plan to maintain strong workover programs next year. Deflated service costs are allowing operators to complete more workovers without appropriating more capital, and they plan to take advantage of the bargain prices available in the oilpatch. Workover activity next year will be concentrated in major oil producing basins of the Rockies.
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and Oceania.
The primary objectives of this seminar was to provide concrete and diversified field experiences in functional literacy approaches, principles, methods and techniques carried out within the framework of an ongoing population education and family planning program. Included in the report are an introduction, general operational procedures…
Use of the Geographic Information System (GIS) in nurseries
Brent Olson; Chad Loreth
2002-01-01
The use of GIs in nursery operations provides a variety of opportunities. All planning activities can be incorporated into an accessible database. GIS can be used to create ways for employees to access and analyze data. The program can be used for historical record keeping. Use of GIS in planning can improve the efficiency of nursery operations. GIS can easily be used...
Guidelines for developing transportation management plans in Virginia.
DOT National Transportation Integrated Search
2005-01-01
A transportation management plan (TMP) is a comprehensive program of traffic control, communication, operation, and demand management strategies designed to maintain acceptable levels of traffic flow in work zones. A systematic procedure and/or check...
DOT National Transportation Integrated Search
2001-01-01
The 2000 North Carolina Rail Plan examines the need for assistance for shortline railroads and describes the railroad industry in North Carolina. It also provides a description of and information about current programs operated by the Rail Division, ...
DOT National Transportation Integrated Search
2013-01-01
The Exploratory Advanced Research (EAR) Program addresses the need for longer term, higher risk research with the potential for longterm improvements to transportation systems-improvements in planning, building, renewing, and operating safe, congesti...
ERIC Educational Resources Information Center
Findorff, Irene K.
This document summarizes the results of a project at Tulane University that was designed to adapt, test, and evaluate a computerized information and menu planning system utilizing linear programing techniques for use in school lunch food service operations. The objectives of the menu planning were to formulate menu items into a palatable,…
25 CFR 47.9 - What are the minimum requirements for the local educational financial plan?
Code of Federal Regulations, 2013 CFR
2013-04-01
... EDUCATION UNIFORM DIRECT FUNDING AND SUPPORT FOR BUREAU-OPERATED SCHOOLS § 47.9 What are the minimum..., including each program funded through the Indian School Equalization Program; (2) A budget showing the costs...) Certification by the chairman of the school board that the plan has been ratified in an action of record by the...
25 CFR 47.9 - What are the minimum requirements for the local educational financial plan?
Code of Federal Regulations, 2012 CFR
2012-04-01
... EDUCATION UNIFORM DIRECT FUNDING AND SUPPORT FOR BUREAU-OPERATED SCHOOLS § 47.9 What are the minimum..., including each program funded through the Indian School Equalization Program; (2) A budget showing the costs...) Certification by the chairman of the school board that the plan has been ratified in an action of record by the...
25 CFR 47.9 - What are the minimum requirements for the local educational financial plan?
Code of Federal Regulations, 2011 CFR
2011-04-01
... EDUCATION UNIFORM DIRECT FUNDING AND SUPPORT FOR BUREAU-OPERATED SCHOOLS § 47.9 What are the minimum..., including each program funded through the Indian School Equalization Program; (2) A budget showing the costs...) Certification by the chairman of the school board that the plan has been ratified in an action of record by the...
25 CFR 47.9 - What are the minimum requirements for the local educational financial plan?
Code of Federal Regulations, 2014 CFR
2014-04-01
... EDUCATION UNIFORM DIRECT FUNDING AND SUPPORT FOR BUREAU-OPERATED SCHOOLS § 47.9 What are the minimum..., including each program funded through the Indian School Equalization Program; (2) A budget showing the costs...) Certification by the chairman of the school board that the plan has been ratified in an action of record by the...
25 CFR 47.9 - What are the minimum requirements for the local educational financial plan?
Code of Federal Regulations, 2010 CFR
2010-04-01
... EDUCATION UNIFORM DIRECT FUNDING AND SUPPORT FOR BUREAU-OPERATED SCHOOLS § 47.9 What are the minimum..., including each program funded through the Indian School Equalization Program; (2) A budget showing the costs...) Certification by the chairman of the school board that the plan has been ratified in an action of record by the...
ERIC Educational Resources Information Center
Anderson, Nancy; And Others
This is one of a set of five handbooks compiled by the Northwest Regional Educational Laboratory that describes the processes for planning and operating a total experience-based career education (EBCE) program. Processes and material are those developed by the original EBCE model--Community Experience in Career Education (CE)2. The area of…
Definition of Life Sciences laboratories for shuttle/Spacelab. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1975-01-01
Research requirements and the laboratories needed to support a Life Sciences research program during the shuttle/Spacelab era were investigated. A common operational research equipment inventory was developed to support a comprehensive but flexible Life Sciences program. Candidate laboratories and operational schedules were defined and evaluated in terms of accomodation with the Spacelab and overall program planning. Results provide a firm foundation for the initiation of a life science program for the shuttle era.
Donnelly, Lane F; Dickerson, Julie M; Lehkamp, Todd W; Gessner, Kevin E; Moskovitz, Jay; Hutchinson, Sally
2008-11-01
As part of a patient safety program in the authors' department of radiology, operational rounds have been instituted. This process consists of radiology leaders' visiting imaging divisions at the site of imaging and discussing frontline employees' concerns about patient safety, the quality of care, and patient and family satisfaction. Operational rounds are executed at a time to optimize the number of attendees. Minutes that describe the issues identified, persons responsible for improvement, and updated improvement plan status are available to employees online. Via this process, multiple patient safety and other issues have been identified and remedied. The authors believe that the process has improved patient safety, the quality of care, and the efficiency of operations. Since the inception of the safety program, the mean number of days between serious safety events involving radiology has doubled. The authors review the background around such walk rounds, describe their particular program, and give multiple illustrative examples of issues identified and improvement plans put in place.
NASA Technical Reports Server (NTRS)
1991-01-01
Seagull Technology, Inc., Sunnyvale, CA, produced a computer program under a Langley Research Center Small Business Innovation Research (SBIR) grant called STAFPLAN (Seagull Technology Advanced Flight Plan) that plans optimal trajectory routes for small to medium sized airlines to minimize direct operating costs while complying with various airline operating constraints. STAFPLAN incorporates four input databases, weather, route data, aircraft performance, and flight-specific information (times, payload, crew, fuel cost) to provide the correct amount of fuel optimal cruise altitude, climb and descent points, optimal cruise speed, and flight path.
1962-03-22
1-62 Operation Order 2-1-62, Effective ____1962 for Operation Dominic 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S...q TG-8.5, 15 Jan 62 co Camand Program Schedule, Eq JTF-8, 17 Jan 62 d. m, Mractor IMA to Wartagcr AID, f i l e referr82 HA-DA-DBA Qtcd l 8 Dec...Establishing the basic secur i ty program of TG 8.5. (c) Developing and dirreminating secur i ty measure8 for action by !CG 8.5 elements. (d) Providing c
34 CFR 200.41 - School improvement plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 1 2011-07-01 2011-07-01 false School improvement plan. 200.41 Section 200.41... Basic Programs Operated by Local Educational Agencies Lea and School Improvement § 200.41 School improvement plan. (a)(1) Not later than three months after an LEA has identified a school for improvement...
49 CFR 1542.301 - Contingency plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 9 2010-10-01 2010-10-01 false Contingency plan. 1542.301 Section 1542.301..., DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Contingency Measures § 1542.301 Contingency plan. (a) Each airport operator required to have a security program under § 1542.103(a) and (b...
30 CFR 784.10 - Information collection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.10... requires applicants for permits for underground coal mines to prepare and submit an operation and...
40 CFR 52.272 - Research operations exemptions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Research operations exemptions. 52.272 Section 52.272 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.272 Research operations...
40 CFR 52.272 - Research operations exemptions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Research operations exemptions. 52.272 Section 52.272 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.272 Research operations...
40 CFR 52.272 - Research operations exemptions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Research operations exemptions. 52.272 Section 52.272 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.272 Research operations...
DOT National Transportation Integrated Search
1999-07-01
This document presents human factors guidelines for designers, owners operators, and planners involved in the development and operation of traffic management centers. Dimensions of the work environment affecting operator and system performance are ad...
The Situation Analysis Study of the family planning program in Kenya.
Miller, R A; Ndhlovu, L; Gachara, M M; Fisher, A A
1991-01-01
A new, relatively "quick and clean" operations research approach called a "situation analysis" was developed for examining the strengths and weaknesses of the family planning program of Kenya. Field research teams visited a stratified random sample of 99 of the Ministry of Health's approximately 775 service delivery points. Observation techniques and interviewing were used to collect information on program components and on the quality of care provided to new family planning clients during the observation day. As late as 1986, the Kenya program was rated "weak" and "poor" in the international literature. The Kenya Situation Analysis Study found a functioning, integrated maternal and child health/family planning program serving large numbers of clients, with an emphasis on oral contraceptives and Depo-Provera (and an underemphasis on permanent methods). Although a number of program problems were revealed by the study, overall, in terms of performance, a rating of "moderate" is suggested as more appropriate for Kenya's national family planning program today. In terms of the quality of care, a "moderate to moderate-high" rating is suggested.
Safety and Environmental Regulation in Industrial Mobilization,
1985-01-01
a shrinking industrial base and a reluctance of many firms to seek out de- fense business? When these "how" questions are answered, plans and...Defense (DOD) off i- cials were interviewed for their plans for addressing the specifics of OSHA and EPA impact in the event of mobilization. The...health programs. If a State’s plan is approved by OSHA, OSHA pays the State up to 50 percent of the program’s operating cost. As of 1982 21 State
20 CFR 637.210 - Incentive bonus program applications.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Incentive bonus program applications. 637.210 Section 637.210 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROGRAMS UNDER TITLE V OF THE JOB TRAINING PARTNERSHIP ACT Program Planning and Operation § 637.210 Incentive...
NASA Technical Reports Server (NTRS)
Elmore, Kim
1992-01-01
The topics addressed are: (1) Terminal Doppler Weather Radar (TDWR) 1991 program review; (2) TDWR demonstrations notable results/events; (3) TDWR demonstration Denver chronology; (4) overview of generic integration concepts; (5) TDWR 1991 program review; (6) Denver operation 1991; and (7) FY-92 plans.
Commercial Foods. Florida Vocational Program Guide.
ERIC Educational Resources Information Center
University of South Florida, Tampa. Dept. of Adult and Vocational Education.
This guide identifies considerations in the organization, operation, and evaluation of secondary and postsecondary vocational education programs. It contains both a vocational program guide and Career Merit Achievement Plan (Career MAP) for commercial foods. The guide contains the following sections: occupational description; program…
Guidelines for Gifted/Talented Programs.
ERIC Educational Resources Information Center
Christensen, Genelle
Presented are guidelines for planning, establishing, and operating gifted/talented programs for exceptional children in Idaho. Topics are outlined which include definitions of terms related to gifted/talented education; general and specific program criteria; criteria for student selection (identification, comprehensive evaluation/assessment,…
DOT National Transportation Integrated Search
1981-08-01
The Transit Reliability Information Program (TRIP) is a government-initiated program to assist the transit industry in satisfying its need for transit reliability information. TRIP provides this assistance through the operation of a national Data Ban...
Status report on the land processes aircraft science management operations working group
NASA Technical Reports Server (NTRS)
Lawless, James G.; Mann, Lisa J.
1991-01-01
Since its inception three years ago, the Land Processes Aircraft Science Management Operations Working Group (MOWG) provided recommendations on the optimal use of the Agency's aircraft in support of the Land Processes Science Program. Recommendations covered topics such as aircraft and sensor usage, development of long-range plans, Multisensor Airborne Campaigns (MAC), program balance, aircraft sensor databases, new technology and sensor development, and increased University scientist participation in the program. Impacts of these recommendations improved the efficiency of various procedures including the flight request process, tracking of flight hours, and aircraft usage. The group also created a bibliography focused on publications produced by Land Processes scientists from the use of the aircraft program, surveyed NASA funded PI's on their participation in the aircraft program, and developed a planning template for multi-sensor airborne campaigns. Benefits from these activities are summarized.
Natural environment application for NASP-X-30 design and mission planning
NASA Technical Reports Server (NTRS)
Johnson, D. L.; Hill, C. K.; Brown, S. C.; Batts, G. W.
1993-01-01
The NASA/MSFC Mission Analysis Program has recently been utilized in various National Aero-Space Plane (NASP) mission and operational planning scenarios. This paper focuses on presenting various atmospheric constraint statistics based on assumed NASP mission phases using established natural environment design, parametric, threshold values. Probabilities of no-go are calculated using atmospheric parameters such as temperature, humidity, density altitude, peak/steady-state winds, cloud cover/ceiling, thunderstorms, and precipitation. The program although developed to evaluate test or operational missions after flight constraints have been established, can provide valuable information in the design phase of the NASP X-30 program. Inputting the design values as flight constraints the Mission Analysis Program returns the probability of no-go, or launch delay, by hour by month. This output tells the X-30 program manager whether the design values are stringent enough to meet his required test flight schedules.
Vector control activities: Fiscal Year, 1986
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1987-04-01
The program is divided into two major components - operations and support studies. The support studies are designed to improve the operational effectiveness and efficiency of the control program and to identify other vector control problems requiring TVA attention and study. Nonchemical methods of control are emphasized and are supplemented with chemical measures as needed. TVA also cooperates with various concerned municipalities in identifying blood-sucking arthropod pest problems and demonstrating control techniques useful in establishing abatement programs, and provides technical assistance to other TVA programs and organizations. The program also helps Land Between The Lakes (LBL) plan and conduct vectormore » control operations and tick control research. Specific program control activities and support studies are discussed.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
... AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROVISIONS GOVERNING THE SENIOR COMMUNITY SERVICE EMPLOYMENT PROGRAM The State Senior Employment Services Coordination Plan § 641.320 Must all national...
Environmental health discipline science plan
NASA Technical Reports Server (NTRS)
1991-01-01
The purpose of this plan is to provide a conceptual strategy for NASA's Life Sciences Division research and development activities in environmental health. It covers the significant research areas critical to NASA's programmatic requirements for the Extended Duration Orbiter, Space Station Freedom, and exploration mission science activities. These science activities include ground-based and flight; basic, applied, and operational; animal and human subjects; and research and development. This document summarizes the history and current status of the program elements, outlines available knowledge, establishes goals and objectives, identifies scientific priorities, and defines critical questions in the three disciplines: (1) Barophysiology, (2) Toxicology, and (3) Microbiology. This document contains a general plan that will be used by both NASA Headquarters Program Officers and the field centers to review and plan basic, applied, and operational research and development activities, both intramural and extramural, in this area. The document is divided into sections addressing these three disciplines.
Food security practice in Kansas schools and health care facilities.
Yoon, Eunju; Shanklin, Carol W
2007-02-01
This pilot study investigated perceived importance and frequency of specific preventive measures, and food and nutrition professionals' and foodservice directors' willingness to develop a food defense management plan. A mail questionnaire was developed based on the US Department of Agriculture document, Biosecurity Checklist for School Foodservice Programs--Developing a Biosecurity Management Plan. The survey was sent to food and nutrition professionals and foodservice operators in 151 acute care hospitals, 181 long-term-care facilities, and 450 school foodservice operations. Chemical use and storage was perceived as the most important practice to protect an operation and was the practice implemented most frequently. Results of the study indicate training programs on food security are needed to increase food and nutrition professionals' motivation to implement preventive measures.
Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pava, Daniel S.
This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) andmore » integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.« less
NASA Technical Reports Server (NTRS)
Decker, Deron R.
1991-01-01
Part of the role of the Mission Operations Lab is the development of budget inputs for Huntsville Operations/Payload Crew Training Center/Payload Operations Control Center (HOSC/PCTC/POCC) activity. These budget inputs are part of the formal Program Operating Plan (POP) process, which occurs twice yearly, and of the formal creation of the yearly operating plan. Both POPs and the operation plan serve the purpose of mapping out planned expenditures for the next fiscal year and for a number of outlying years. Based on these plans, the various Project Offices at the Center fund the HOSC/PCTC/POCC activity. Because of Mission Operations Lab's role in budget development, some of the Project Offices have begun looking to Mission Operations, and specifically the EO02 branch, to track expenditures and explain/justify any deviations from plans. EO02 has encountered difficulties acquiring the necessary information to perform this function. It appears that the necessary linkages with other units had not been fully developed and integrated with the flow of information in budget implementation. The purpose of this study is to document the budget process from the point of view of EO02 and to identify the steps necessary for it to effectively perform this role on a continuous basis.
Flying Cassini with Virtual Operations Teams
NASA Technical Reports Server (NTRS)
Dodd, Suzanne; Gustavson, Robert
1998-01-01
The Cassini Program's challenge is to fly a large, complex mission with a reduced operations budget. A consequence of the reduced budget is elimination of the large, centrally located group traditionally used for uplink operations. Instead, responsibility for completing parts of the uplink function is distributed throughout the Program. A critical strategy employed to handle this challenge is the use of Virtual Uplink Operations Teams. A Virtual Team is comprised of a group of people with the necessary mix of engineering and science expertise who come together for the purpose of building a specific uplink product. These people are drawn from throughout the Cassini Program and participate across a large geographical area (from Germany to the West coast of the USA), covering ten time zones. The participants will often split their time between participating in the Virtual Team and accomplishing their core responsibilities, requiring significant planning and time management. When the particular uplink product task is complete, the Virtual Team disbands and the members turn back to their home organization element for future work assignments. This time-sharing of employees is used on Cassini to build mission planning products, via the Mission Planning Virtual Team, and sequencing products and monitoring of the sequence execution, via the Sequence Virtual Team. This challenging, multitasking approach allows efficient use of personnel in a resource constrained environment.
Decision support systems for transportation system management and operations (TSM&O).
DOT National Transportation Integrated Search
2015-12-01
There is a need for the development of tools and methods to support off-line and real-time : planning and operation decisions associated with the Transportation System Management and : Operations (TSM&O) program. The goal of this proposed project is ...
Opportunities in Manpower Training Programs for the Forest Service and Its Cooperators.
ERIC Educational Resources Information Center
Forest Service (USDA), Washington, DC.
Manpower programs in which the U.S. Forest Service can participate are identified in this booklet, and methods and procedures for initiating programs in the interest of meeting the needs of rural areas are explained. Major divisions of the document are Overall Planning, Program Sponsorship, The Program-Operation Mainstream, Manpower Development…
ERIC Educational Resources Information Center
Fairfax County Schools, Baileys Crossroads, VA. Center for Effecting Educational Change.
This report is an assessment of the overall impact and influence on education of 137 terminated Planning and Operational Grants made under the ESEA Title III Projects to Advance Creativity in Education (PACE) program. Analysis and evaluation seek to determine whether (1) individual project objectives were identified and achieved, (2) PACE…
ERIC Educational Resources Information Center
Federal Bureau of Investigation, Washington, DC. National Crime Information Center.
This document is the second volume of a two-volume set of lesson plans that together make up a complete training package for full-service terminal operators. The lesson plans are designed to ensure that a state's National Crime Information Center (NCIC) training program meets Advisory Policy Board standards. (NCIC is a nationwide computerized…
EAR Program Research Results : Updated through 2013
DOT National Transportation Integrated Search
2013-12-31
The Exploratory Advanced Research (EAR) Program addresses the need for longer term, higher risk research with the potential for long-term improvements to transportation systemsimprovements in planning, building, renewing, and operating safe, conge...
EAR Program Research Results: Updated through 2014
DOT National Transportation Integrated Search
2014-12-31
The Exploratory Advanced Research (EAR) Program addresses the need for longer term, higher risk research with the potential for long-term improvements to transportation systemsimprovements in planning, building, renewing, and operating safe, conge...
EAR Program Research Results: Updated through 2016
DOT National Transportation Integrated Search
2016-12-31
The Exploratory Advanced Research (EAR) Program addresses the need for longer term, higher risk research with the potential for long-term improvements to transportation systemsimprovements in planning, building, renewing, and operating safe, conge...
Production Program - Operational - SNAP 10A Units
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1961-08-07
This planning report is provided to describe the lead time, approximate costs, and major decisions and approvals required to enter a production program for the 500 watt SNAP 10A nuclear space power system.
Program Activity/Training Plans. STIP II (Skill Training Improvement Programs Round II).
ERIC Educational Resources Information Center
Los Angeles Community Coll. District, CA.
Detailed operational guidelines, training objectives, and learning activities are provided for the Los Angeles Community College District's Skill Training Improvement Programs (STIP II), which are designed to train students for immediate employment. The first of four reports covers Los Angeles Southwest College's computer programming trainee…
ERIC Educational Resources Information Center
Daniel, Clarence H.
This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…
Daniel Navon
1978-01-01
These 14 papers were submitted to a conference of Project Group P4.07 Division IV, International Union of Forestry Research Organizations. Topics discussed included the uses of simulations, analytical techniques, and mathematical programming techniques in land management planning, reforestation programs, intensive forestry, timber management and production, tree growth...
ERIC Educational Resources Information Center
MCKEE, ROBERT L.; RIDLEY, KATHRYN J.
TO ESTABLISH A COLLEGE IN 100 DAYS PRESENTED AN OPPORTUNITY TO TEST THE VALUE OF PROGRAMED ORGANIZATIONAL PROCEDURES USING PROGRAM PERFORMANCE EVALUATION AND REVIEW TECHNIQUE (PERT) UNDER ACTUAL OPERATIONAL CONDITIONS, NOT IN A SIMULATED THEORETICAL SITUATION. THROUGH THE AID OF THE PERT PLANNING SYSTEM, IT WAS DETERMINED THAT THERE WERE NINE…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boe, Stephen J.; Ogburn, Parker N.
2003-03-01
This is the second annual report of a multi-year project to operate adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to restore fisheries in these streams. Statement of Work Objectives for 2001: (1) Participate in implementation of the comprehensive multiyear operations plan for the Grande Ronde Endemic Spring chinook Supplementation Program (GRESCP). (2) Plan detailed GRESCP Monitoring and Evaluation for future years. (3)more » Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (4) Plan for data collection needs for bull trout. (5) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (6) Collect summer steelhead. (7) Monitor adult endemic spring chinook salmon populations and collect broodstock. (8) Acclimate juvenile spring chinook salmon prior to release into the upper Grande Ronde River and Catherine Creek. (9) Monitor adult population abundance and characteristics of Grande Ronde River spring chinook salmon populations. (10) Monitor condition, movement, and mortality of spring chinook salmon acclimated at remote facilities. (11) Participate in Monitoring & Evaluation of the captive brood component of the Program to document contribution to the Program. (12) Monitor water quality at facilities. (13) Document accomplishments and needs to permitters, comanagers, and funding agencies. (14) Communicate Project results to the scientific community.« less
Commercial Vehicle Driving. Florida Vocational Program Guide.
ERIC Educational Resources Information Center
University of South Florida, Tampa. Dept. of Adult and Vocational Education.
This guide identifies considerations in the organization, operation, and evaluation of secondary and postsecondary vocational education programs. It contains both a vocational program guide and Career Merit Achievement Plan (Career MAP) for commercial vehicle driving. The guide contains the following sections: occupational description; program…
Space Station Program Description Document. Books 1-7
NASA Technical Reports Server (NTRS)
1984-01-01
The Space Station Program Description Document is summarized. The six volumes include: (1) introduction and summary; (2) mission description; (3) systems requirements and characteristics; (4) advanced development; (6) system operations; and (7) program plan. Volume 5 was deleted as a separate book.
Precision Metal Fabrication. Florida Vocational Program Guide.
ERIC Educational Resources Information Center
University of South Florida, Tampa. Dept. of Adult and Vocational Education.
This guide identifies considerations in the organization, operation, and evaluation of secondary and postsecondary vocational education programs. It contains both a vocational program guide and Career Merit Achievement Plan (Career MAP) for precision metal fabrication. The guide contains the following sections: occupational description; program…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boe, Stephen J.; Lofy, Peter T.
2002-11-01
This is the second annual report of a multi-year, multi-agency project to restore spring chinook salmon populations in the Grande Ronde River Basin (Grande Ronde Endemic Chinook Salmon Program--GRESCP). The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) operates adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to increase natural production and restore fisheries in these two streams. Statement of Work Objectives formore » 1999: (1) Participate in development and continued implementation of the comprehensive multi year operations plan for the Grande Ronde Endemic Supplementation Program. (2) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2000. (3) Monitor adult endemic spring chinook salmon populations and collect broodstock. (4) Plan detailed Monitoring and Evaluation for future years. (5) Monitor population abundance and characteristics and local environmental factors that may influence abundance and run timing of Grande Ronde River spring chinook populations. (6) Participate in Monitoring and Evaluation of the captive brood component of the Program to assure this component is contributing to the Program. (7) Participate in data collection for incidentally-caught bull trout and summer steelhead and planning for recovery of summer steelhead populations. (8) Document accomplishments and needs to permitters, comanagers, and funding agencies. (9) Communicate project results to the scientific community.« less
National Transonic Facility: A review of the operational plan
NASA Technical Reports Server (NTRS)
Liepmann, H. W.; Black, R. E.; Dietz, R. O.; Kirchner, M. E.; Sears, W. R.
1980-01-01
The proposed National Transonic Facility (NTF) operational plan is reviewed. The NTF will provide an aerodynamic test capability significantly exceeding that of other transonic regime wind tunnels now available. A limited number of academic research program that might use the NTF are suggested. It is concluded that the NTF operational plan is useful for management, technical, instrumentation, and model building techniques available in the specialized field of aerodynamic analysis and simulation. It is also suggested that NASA hold an annual conference to discuss wind tunnel research results and to report on developments that will further improve the utilization and cost effectiveness of the NTF and other wind tunnels.
Providing quality family planning and MCH services in the urban areas: the YKB experience.
1986-06-01
In Indonesia, the provision of family planning services to the community for a fee through a privately operated clinic is a relatively new concept. The idea to charge patients for family planning services came up during several meetings sponsored by the National Family Planning Coordinating Board (NFPCB) in its effort to increase family planning acceptance in urban areas. NFPCB realized that while the village family planning program was very effective, the urban family planning program was lagging behind for several reasons: while its services were free, most government-run clinics were open only in the morning, making it inconvenient for working mothers to avail themselves of the services; government operated clinics were crowded; since the services were free, they were perceived to be not of good quality; and there was a limited range of contraceptives and drugs available in the government operated clinics. In 1980, the Yayasan Kusuma Buana (YKB), a private nonprofit health and family planning organization in Jakarta, was asked by the Badan Koordenasi Keluarga Berencana Nasional (BKKBN) to set up a semi-commercial, urban family planning clinic as a pilot project. The clinic was established in an area where most of the residents belonged to the lower middle income group. After almost 3 years, the clinic became self-reliant and was used by the YKB as a basis for expanding the project. Currently, there are 9 such clinics in Jakarta and YKB is helping 10 other Indonesian cities to set up their own clinics. This paper considers the main components of YKB's strategy for planning and managing the clinic and and provides an analysis of the YKB experience in operating a successful family planning and maternal and child health program in the urban areas. To become self-reliant and at the same time have a successful family planning and health program, clinics should have the following characteristics: integrated services; competent and attractive clinic personnel; a strategic location; longer clinic hours; and a reasonable fee structure. A variety of outreach activities have been found to be useful in generating communiting interest in the YKB clinics, including inviting mothers groups to hold their meetings on the clinic premises. Information/education/communication materials in the form of posters, leaflets, booklets, flipcharts, and magnetic boards are needed to support community outreach and promotional activities. Those who plan to undertake the creation of a private clinic should keep in mind the following points if success is to be realized: community outreach is critical; clinic services should be adapted to community needs; adequate staff training and support should be provided; services should be expanded; and ties with government organizations, medical organizations, and community groups should be established and maintained.
40 CFR 122.25 - Aquaculture projects (applicable to State NPDES programs, see § 123.25).
Code of Federal Regulations, 2011 CFR
2011-07-01
... applicant plans to confine the cultivated species, using a method or plan or operation (including, but not limited to, physical confinement) which, on the basis of reliable scientific evidence, is expected to...
40 CFR 122.25 - Aquaculture projects (applicable to State NPDES programs, see § 123.25).
Code of Federal Regulations, 2013 CFR
2013-07-01
... applicant plans to confine the cultivated species, using a method or plan or operation (including, but not limited to, physical confinement) which, on the basis of reliable scientific evidence, is expected to...
40 CFR 122.25 - Aquaculture projects (applicable to State NPDES programs, see § 123.25).
Code of Federal Regulations, 2012 CFR
2012-07-01
... applicant plans to confine the cultivated species, using a method or plan or operation (including, but not limited to, physical confinement) which, on the basis of reliable scientific evidence, is expected to...
40 CFR 122.25 - Aquaculture projects (applicable to State NPDES programs, see § 123.25).
Code of Federal Regulations, 2014 CFR
2014-07-01
... applicant plans to confine the cultivated species, using a method or plan or operation (including, but not limited to, physical confinement) which, on the basis of reliable scientific evidence, is expected to...
South Dakota ITS/CVO business plan
DOT National Transportation Integrated Search
1998-01-01
This report defines an ITS/CVO program for the State of South Dakota. It is a Business Plan to guide the deployment of Intelligent Transportation Systems (ITS) technology for improving commercial vehicle operations (CVO) in South Dakota. This ITS/CVO...
78 FR 77550 - Integrated Corridor Management Deployment Planning Grants
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-23
... of this program is to promote the integrated management and operations of the transportation system... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Integrated Corridor Management... the Integrated Corridor Management Deployment Planning Grants. The purpose of this notice was to...
Annual Plan for the EPA and CSB - FY 2015
This plan describes how the OIG will achieve its statutory mission of promoting economy, efficiency, effectiveness and integrity relating to the programs and operations of the EPA and the U.S. Chemical Safety and Hazard Investigation Board.
Annual Plan for the EPA and CSB - FY 2016
This plan describes how the OIG will achieve its statutory mission of promoting economy, efficiency, effectiveness and integrity relating to the programs and operations of the EPA and the U.S. Chemical Safety and Hazard Investigation Board.
7 CFR 1470.22 - Conservation stewardship plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS CONSERVATION STEWARDSHIP PROGRAM Contracts... process as outlined in the National Planning Procedures Handbook to encourage participants to address... the participant's decisions that describes the schedule of conservation activities to be implemented...
Evaluation of the Trajectory Operations Applications Software Task (TOAST)
NASA Technical Reports Server (NTRS)
Perkins, Sharon; Martin, Andrea; Bavinger, Bill
1990-01-01
The Trajectory Operations Applications Software Task (TOAST) is a software development project under the auspices of the Mission Operations Directorate. Its purpose is to provide trajectory operation pre-mission and real-time support for the Space Shuttle program. As an Application Manager, TOAST provides an isolation layer between the underlying Unix operating system and the series of user programs. It provides two main services: a common interface to operating system functions with semantics appropriate for C or FORTRAN, and a structured input and output package that can be utilized by user application programs. In order to evaluate TOAST as an Application Manager, the task was to assess current and planned capabilities, compare capabilities to functions available in commercially-available off the shelf (COTS) and Flight Analysis Design System (FADS) users for TOAST implementation. As a result of the investigation, it was found that the current version of TOAST is well implemented and meets the needs of the real-time users. The plans for migrating TOAST to the X Window System are essentially sound; the Executive will port with minor changes, while Menu Handler will require a total rewrite. A series of recommendations for future TOAST directions are included.
ERIC Educational Resources Information Center
Kim, Yeonsoo
2010-01-01
This article proposes a model for planning and operating an effective succession planning and management (SP&M) program and measuring its value. The nature of the research is exploratory, following a qualitative approach using in-depth interviews. Representatives of multinational companies interviewed for this study revealed that succession…
Manpower Goals Planning and Accountability. Research Report 34.
ERIC Educational Resources Information Center
Niehaus, R. J.; Nitterhouse, D.
Based on previous application of goal programming models to manpower goals planning for large organizations, this paper structures the extensions from the planning process to the operations and control aspects of the management cycle. Emphasis is on the accountability necessary to make such a system an effective management control tool. In order…
DOT National Transportation Integrated Search
2016-08-01
This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...
13 CFR 124.403 - How is a business plan updated and modified?
Code of Federal Regulations, 2010 CFR
2010-01-01
... incorporated into its business plan. The transition management strategy must describe: (1) How the Participant... business growth and promote profitable business operations after the expiration of its program term. (d... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false How is a business plan updated and...
ERIC Educational Resources Information Center
Downing, David L.
2009-01-01
This study describes and implements a necessary preliminary strategic planning procedure, the Internal Environmental Scanning (IES), and discusses its relevance to strategic planning and university-sponsored lifelong learning program model selection. Employing a qualitative research methodology, a proposed lifelong learning-centric IES process…
NASA Technical Reports Server (NTRS)
1971-01-01
The design plan requirements define the design implementation and control requirements for Phase C/D of the Modular Space Station Project and specifically address the Initial Space Station phase of the Space Station Program (modular). It is based primarily on the specific objective of translating the requirements of the Space Station Program, Project, Interface, and Support Requirements and preliminary contract end x item specifications into detail design of the operational systems which comprise the initial space station. This document is designed to guide aerospace contractors in the planning and bidding for Phase C/D.
Commercialization of the land remote sensing system: An examination of mechanisms and issues
NASA Technical Reports Server (NTRS)
Cauley, J. K.; Gaelick, C.; Greenberg, J. S.; Logsdon, J.; Monk, T.
1983-01-01
In September 1982 the Secretary of Commerce was authorized (by Title II of H.R. 5890 of the 97th Congress) to plan and provide for the management and operation of the civil land remote sensing satellite systems, to provide for user fees, and to plan for the transfer of the ownership and operation of future civil operational land remote sensing satellite systems to the private sector. As part of the planning for transfer, a number of approaches were to be compared including wholly private ownership and operation of the system by an entity competitively selected, mixed government/private ownership and operation, and a legislatively-chartered privately-owned corporation. The results of an analysis and comparison of a limited number of financial and organizational approaches for either transfer of the ownership and operation of the civil operational land remote sensing program to the private sector or government retention are presented.
40 CFR 63.7800 - What are my operation and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... prepare and operate at all times according to a written operation and maintenance plan for each capture... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel...
40 CFR 63.7800 - What are my operation and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... prepare and operate at all times according to a written operation and maintenance plan for each capture... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel...
40 CFR 63.7800 - What are my operation and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... prepare and operate at all times according to a written operation and maintenance plan for each capture... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel...
40 CFR 63.7800 - What are my operation and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... prepare and operate at all times according to a written operation and maintenance plan for each capture... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel...
40 CFR 63.7800 - What are my operation and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... prepare and operate at all times according to a written operation and maintenance plan for each capture... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel...
30 CFR 947.843 - Federal enforcement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... planning department in the county government where the operation is located, a copy of the enforcement... PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE WASHINGTON § 947.843 Federal... required for violations on surface coal mining and reclamation operations. (b) Upon request OSM shall...
Fuzzy robust credibility-constrained programming for environmental management and planning.
Zhang, Yimei; Hang, Guohe
2010-06-01
In this study, a fuzzy robust credibility-constrained programming (FRCCP) is developed and applied to the planning for waste management systems. It incorporates the concepts of credibility-based chance-constrained programming and robust programming within an optimization framework. The developed method can reflect uncertainties presented as possibility-density by fuzzy-membership functions. Fuzzy credibility constraints are transformed to the crisp equivalents with different credibility levels, and ordinary fuzzy inclusion constraints are determined by their robust deterministic constraints by setting a-cut levels. The FRCCP method can provide different system costs under different credibility levels (lambda). From the results of sensitivity analyses, the operation cost of the landfill is a critical parameter. For the management, any factors that would induce cost fluctuation during landfilling operation would deserve serious observation and analysis. By FRCCP, useful solutions can be obtained to provide decision-making support for long-term planning of solid waste management systems. It could be further enhanced through incorporating methods of inexact analysis into its framework. It can also be applied to other environmental management problems.
Guide to good practices for operations and administration updates through required reading
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-12-01
This Guide to Good Practices is written to enhance understanding of, and provide direction for, Required Reading, Chapter XIV of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing programs for updating personnel with operations and administration information through required reading. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Required Reading is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a coordinated requiredmore » reading program to promote safe and efficient operations.« less
Track Geometry Development : UMTA Urban Rail Supporting Technology Program
DOT National Transportation Integrated Search
1974-04-01
Measurement of transit system track geometry parameters, under normal operating conditions, is essential for planning and conducting an effective maintenance program. The pertinent parameters are profile, gage, alignment, and cross level. Present met...
ERIC Educational Resources Information Center
Indian Journal of Adult Education, 1975
1975-01-01
Strategies for weed control in cropped and non-cropped areas are presented together with an operational plan for implementing a program for weed control at the national level. The program includes training personnel and community education procedures. (EC)
7 CFR 272.10 - ADP/CIS Model Plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... those which result in effective programs or in cost effective reductions in errors and improvements in management efficiency, such as decreases in program administrative costs. Thus, for those State agencies which operate exceptionally efficient and effective programs, a lesser degree of automation may be...
22 CFR Appendix I to Part 211 - Operational Plan
Code of Federal Regulations, 2010 CFR
2010-04-01
.... If there are several objectives, indicate priorities. c. Describe the target population by program... coverage and the percent of total target population reached. d. Describe the intervention including: (1... World Food Program) emergency request normally requires more Mission involvement in program design and...
A screening mammography program. Staying alive and making it work.
Monsees, B S; Destouet, J M
1992-01-01
The success of a mammography screening program requires thorough planning. A dependably high volume and a streamlined efficient operation are essential to survival of the program. Factors that warrant consideration prior to designing such a program include the following: Distinction between screening and diagnostic mammography examinations. Selection of a site that will meet the needs of the community and yet provide a consistently high volume. Low examination cost for screening mammography coupled with a detailed financial analysis and reappraisal on an ongoing basis. A customized marketing program that incorporates methods to increase awareness, compliance, and utilization by women and referring physicians. Well-trained, efficient, and dedicated personnel. An operation that is designed for rapid throughput and expeditious patient flow. An efficient plan for film handling, interpretation, reporting, and storage. Timely communication of examination results. A reliable mechanism for follow-up evaluation and outcome data collection. Establishment of a consistent and reliable quality assurance program and the production of high quality mammograms.
Light Water Reactor Sustainability Accomplishments Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCarthy, Kathryn A.
Welcome to the 2014 Light Water Reactor Sustainability (LWRS) Program Accomplishments Report, covering research and development highlights from 2014. The LWRS Program is a U.S. Department of Energy research and development program to inform and support the long-term operation of our nation’s commercial nuclear power plants. The research uses the unique facilities and capabilities at the Department of Energy national laboratories in collaboration with industry, academia, and international partners. Extending the operating lifetimes of current plants is essential to supporting our nation’s base load energy infrastructure, as well as reaching the Administration’s goal of reducing greenhouse gas emissions to 80%more » below 1990 levels by the year 2050. The purpose of the LWRS Program is to provide technical results for plant owners to make informed decisions on long-term operation and subsequent license renewal, reducing the uncertainty, and therefore the risk, associated with those decisions. In January 2013, 104 nuclear power plants operated in 31 states. However, since then, five plants have been shut down (several due to economic reasons), with additional shutdowns under consideration. The LWRS Program aims to minimize the number of plants that are shut down, with R&D that supports long-term operation both directly (via data that is needed for subsequent license renewal), as well indirectly (with models and technology that provide economic benefits). The LWRS Program continues to work closely with the Electric Power Research Institute (EPRI) to ensure that the body of information needed to support SLR decisions and actions is available in a timely manner. This report covers selected highlights from the three research pathways in the LWRS Program: Materials Aging and Degradation, Risk-Informed Safety Margin Characterization, and Advanced Instrumentation, Information, and Control Systems Technologies, as well as a look-ahead at planned activities for 2015. If you have any questions about the information in the report, or about the LWRS Program, please contact me, Richard A. Reister (the Federal Program Manager), or the respective research pathway leader (noted on pages 26 and 27), or visit the LWRS Program website (www.inl.gov/lwrs). The annually updated Integrated Program Plan and Pathway Technical Program Plans are also available for those seeking more detailed technical Information.« less
ERIC Educational Resources Information Center
Ohio State Univ., Columbus. Center on Education and Training for Employment.
This instructor guide for a unit on business operations in the PACE (Program for Acquiring Competence in Entrepreneurship) curriculum includes the full text of the student module and lesson plans, instructional suggestions, and other teacher resources. The competencies that are incorporated into this module are at Level 1 of…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-24
... ago. (For example, 10 CSR 10-5.250 required existing sources to comply with emissions limitation no... identified in the approved SIP as 10 CSR 10- 2.150, 4.140, and 5.250, applicable to the Kansas City... to the Operating Permits Program (10 CSR 10-6.110). One revision changes the reporting threshold for...
CRRES Prelaunch Mission Operation Report
NASA Technical Reports Server (NTRS)
1990-01-01
The overall NASA Combined Release and Radiation Effects Satellite (CRRES) program consists of a series of chemical releases from the PEGSAT spacecraft, the CRRES spacecraft and sounding rockets. The first chemical releases were made from the PEGSAT spacecraft in April, 1990 over northern Canada. In addition to the releases planned from the CRRES spacecraft there are releases from sounding rockets planned from the Kwajalein rocket range in July and August, 1990 and from Puerto Rico in June and July, 1991. It shows the major milestones in the overall CRRES program. This Mission Operations Report only describes the NASA mission objectives of the CRRES/Geosynchronous Transfer Orbit (GTO) mission.
Space shuttle maintenance program planning document
NASA Technical Reports Server (NTRS)
Brown, D. V.
1972-01-01
A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.
Redesign of occupational health service operations--strategic planning and evaluation.
Tobias, Beverley; Burnes-Line, Bernadette; Pellarin, Margaret
2008-10-01
This article describes the strategic planning process used by a major academic medical center to redesign the employee health service. The steps in the process are discussed and data demonstrating the success of the program redesign are presented.
Annual Plan for the EPA and CSB - FY 2017
Dec 19, 2016. This plan describes how the OIG will achieve its statutory mission of promoting economy, efficiency, effectiveness and integrity relating to the programs and operations of the EPA and the U.S. Chemical Safety and Hazard Investigation Board.
South Dakota ITS/CVO business plan : executive summary
DOT National Transportation Integrated Search
1998-01-19
This report defines an ITS/CVO program for the State of South Dakota. It is a Business Plan to guide the deployment of Intelligent Transportation Systems (ITS) technology for improving commercial vehicle operations (CVO) in South Dakota. This ITS/CVO...
SOFIA Update and Science Vision
NASA Technical Reports Server (NTRS)
Smith, Kimberly
2017-01-01
I will present an overview of the SOFIA program, its science vision and upcoming plans for the observatory. The talk will feature several scientific highlights since full operations, along with summaries of planned science observations for this coming year, platform enhancements and new instrumentation.
Annual Plan for the EPA and CSB - FY 2018
Nov 9, 2017. FY 2018 plan reflects the priority work that the OIG believes is necessary to keep the EPA Administrator, the CSB, and Congress fully informed about problems and deficiencies relating to the administration of agency programs and operations.
Getting Started in the Child Care Business.
ERIC Educational Resources Information Center
Kimery, Sharon
This pamphlet discusses questions to consider when planning a child care facility. Topics discussed include licensing, financial management, written policies on facility operation, recordkeeping, insurance, the physical nature of the facility, program planning, scheduling of daily activities, personnel selection, staff development, parent…
49 CFR 1542.301 - Contingency plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Contingency Measures § 1542.301 Contingency plan. (a) Each airport operator required to have a security program under § 1542.103(a) and (b...
49 CFR 1542.301 - Contingency plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Contingency Measures § 1542.301 Contingency plan. (a) Each airport operator required to have a security program under § 1542.103(a) and (b...
49 CFR 1542.301 - Contingency plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Contingency Measures § 1542.301 Contingency plan. (a) Each airport operator required to have a security program under § 1542.103(a) and (b...
49 CFR 1542.301 - Contingency plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION, DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Contingency Measures § 1542.301 Contingency plan. (a) Each airport operator required to have a security program under § 1542.103(a) and (b...
46 CFR 8.535 - Training and operational evaluation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Training and operational evaluation. 8.535 Section 8.535... ALTERNATIVES Streamlined Inspection Program § 8.535 Training and operational evaluation. When the CAP and VAP(s) have been approved by the cognizant OCMI, the company may begin training and operating under the plans...
Research and Technology Operating Plan. Summary: Fiscal year 1976 research and technology program
NASA Technical Reports Server (NTRS)
1976-01-01
A compilation of the summary portions of each of the Research and Technology Operating Plans (RTOP) used for management review and control of research currently in progress throughout NASA was presented. The document is arranged in five sections. The first one contains citations and abstracts of the RTOP. This is followed by four indexes: subject, technical monitor, responsible NASA organization, and RTOP number.
Planning for Multiagent Using ASP-Prolog
NASA Astrophysics Data System (ADS)
Son, Tran Cao; Pontelli, Enrico; Nguyen, Ngoc-Hieu
This paper presents an Answer Set Programming based approach to multiagent planning. The proposed methodology extends the action language \\cal B in [12] to represent and reason about plans with cooperative actions of an individual agent operating in a multiagent environment. This language is used to formalize multiagent planning problems and the notion of a joint plan for multiagent in the presence of cooperative actions. Finally, the paper presents a system for computing joint plans based on the ASP-Prolog system.
ERIC Educational Resources Information Center
National Alliance of Business, Inc., Washington, DC.
This guide offers a practical approach for operating summer youth employment programs that involves cooperation among private businesses and local organizations. A timetable provides a month-by-month schedule. Seven sections discuss management responsibilities. Program Planning covers scope, goals, and coordination. Program Management addresses…
40 CFR 63.1654 - Operational and work practice standards.
Code of Federal Regulations, 2013 CFR
2013-07-01
... according to a written fugitive dust control plan must be incorporated in the operating permit for the... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Operational and work practice standards... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES...
Code of Federal Regulations, 2014 CFR
2014-07-01
..., operate, and maintain a CEMS to monitor CO and either O2 or CO2 according to the requirements in... program must be part of the maintenance plan for the engine. (j) If you own or operate a stationary SI...
30 CFR 947.842 - Federal inspections.
Code of Federal Regulations, 2010 CFR
2010-07-01
... planning department in the county government where the operation is located, a copy of the enforcement... PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE WASHINGTON § 947.842 Federal... coal mining and reclamation operations. (b) Upon request OSM shall furnish a copy of any inspection...
Piaget's Theories and Some Possible Implications for Educational Television.
ERIC Educational Resources Information Center
Bliss, Joan; And Others
1983-01-01
Details Piaget's four stages in the cognitive development of children--the sensorimotor period, pre-operational stage, concrete operational stage, and formal operational stage--and discusses their implications for the planning and design of programs for instructional television, and possible effects on mental development and the cognitive…
ERIC Educational Resources Information Center
Kiser, Chester; And Others
This 2-part document is designed to aid school districts in the implementation of a planning programing budgeting system. The first part of the manual contains (1) statements of policy, (2) a master flowchart, (3) organization and functions of a PPBS system, (4) a flowscript of procedures, (5) job outlines, and (6) supplementary appendix material.…
Space Station crew safety alternatives study. Volume 5: Space Station safety plan
NASA Technical Reports Server (NTRS)
Mead, G. H.; Peercy, R. L., Jr.; Raasch, R. F.
1985-01-01
The Space Station Safety Plan has been prepared as an adjunct to the subject contract final report, suggesting the tasks and implementation procedures to ensure that threats are addressed and resolution strategy options identified and incorporated into the space station program. The safety program's approach is to realize minimum risk exposure without levying undue design and operational constraints. Safety objectives and risk acceptances are discussed.
Financial performance of health plans in Medicaid managed care.
McCue, Mike
2012-01-01
This study assesses the financial performance of health plans that enroll Medicaid members across the key plan traits, specifically Medicaid dominant, publicly traded, and provider-sponsored. National Association of Insurance Commissioners (NAIC) financial data, coupled with selected state financial data, were analyzed for 170 Medicaid health plans for 2009. A mean test compared the mean values for medical loss, administrative cost, and operating margin ratios across these plan traits. Medicaid dominant plans are plans with 75 percent of their total enrollment in the Medicaid line of business. Plans that are Medicaid dominant and publicly traded incurred a lower medical loss ratio and higher administrative cost ratio than multi-product and non-publicly traded plans. Medicaid dominant plans also earned a higher operating profit margin. Plans offering commercial and Medicare products are operating at a loss for their Medicaid line of business. Health plans that do not specialize in Medicaid are losing money. Higher medical cost rather than administrative cost is the underlying reason for this financial loss. Since Medicaid enrollees do not account for their primary book of business, these plans may not have invested in the medical management programs to reduce inappropriate emergency room use and avoid costly hospitalization.
School Library Resources Program. Final Report, 1983-1984.
ERIC Educational Resources Information Center
District of Columbia Public Schools, Washington, DC. Div. of Quality Assurance.
Data for this evaluation of the District of Columbia Public Schools (DCPS) School Library Resources Program as operated during the 1983-84 school year were collected via surveys of library media specialists and teachers. The stated objectives of the program scheduled for attainment by June 1984 called for planning a pilot program for…
A PLAN FOR AN EMPLOYMENT ORIENTATION PROGRAM FOR RETARDED PUPILS IN PUBLIC SCHOOLS IN NEW JERSEY.
ERIC Educational Resources Information Center
New Jersey State Dept. of Education, Trenton.
THE GENERAL NATURE OF THE EMPLOYMENT ORIENTATION PROGRAM AND THE IMPORTANCE OF SAFEGUARDING THE TRAINEES' EDUCATIONAL OBJECTIVES AND PERSONAL SAFETY ARE PRESENTED. THIS PROGRAM IS DESIGNED SPECIFICALLY FOR MENTALLY RETARDED STUDENTS AND DIFFERS FROM OTHER COOPERATIVE EDUCATION PROGRAMS IN OBJECTIVES AND OPERATIONAL PROCEDURES. OF PRIME IMPORTANCE…
Specialized Vocational Services for the Individual with Epilepsy.
ERIC Educational Resources Information Center
Fraser, Robert T.; And Others
A specialized vocational program served 108 epileptic individuals who participated in the program during the first 18 months of its operation. The following are some of the aspects of the program: utilization of the neuropsychological data in rehabilitation planning, brief work adjustment, a job station program, training in job seeking skills,…
Code of Federal Regulations, 2012 CFR
2012-10-01
... Program Design and Operations § 287.130 Can NEW Program activities include job market assessments, job...) Communication with any training, research, or educational agencies that have produced economic development plans...-sufficiency of program participants; (6) Surveys to collect information regarding client characteristics; and...
Code of Federal Regulations, 2013 CFR
2013-10-01
... Program Design and Operations § 287.130 Can NEW Program activities include job market assessments, job...) Communication with any training, research, or educational agencies that have produced economic development plans...-sufficiency of program participants; (6) Surveys to collect information regarding client characteristics; and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Program Design and Operations § 287.130 Can NEW Program activities include job market assessments, job...) Communication with any training, research, or educational agencies that have produced economic development plans...-sufficiency of program participants; (6) Surveys to collect information regarding client characteristics; and...
NASA Technical Reports Server (NTRS)
Fuller, Sean; Dillon, William F.
2006-01-01
As the Space Shuttle continues flight, construction and assembly of the International Space Station (ISS) carries on as the United States and our International Partners resume the building, and continue to carry on the daily operations, of this impressive and historical Earth-orbiting research facility. In his January 14, 2004, speech announcing a new vision for America s space program, President Bush ratified the United States commitment to completing construction of the ISS by 2010. Since the launch and joining of the first two elements in 1998, the ISS and the partnership have experienced and overcome many challenges to assembly and operations, along with accomplishing many impressive achievements and historical firsts. These experiences and achievements over time have shaped our strategy, planning, and expectations. The continual operation and assembly of ISS leads to new knowledge about the design, development and operation of systems and hardware that will be utilized in the development of new deep-space vehicles needed to fulfill the Vision for Exploration and to generate the data and information that will enable our programs to return to the Moon and continue on to Mars. This paper will provide an overview of the complexity of the ISS Program, including a historical review of the major assembly events and operational milestones of the program, along with the upcoming assembly plans and scheduled missions of the space shuttle flights and ISS Assembly sequence.
Cardiopulmonary discipline science plan
NASA Technical Reports Server (NTRS)
1991-01-01
Life sciences research in the cardiopulmonary discipline must identify possible consequences of space flight on the cardiopulmonary system, understand the mechanisms of these effects, and develop effective and operationally practical countermeasures to protect crewmembers inflight and upon return to a gravitational environment. The long-range goal of the NASA Cardiopulmonary Discipline Research Program is to foster research to better understand the acute and long-term cardiovascular and pulmonary adaptation to space and to develop physiological countermeasures to ensure crew health in space and on return to Earth. The purpose of this Discipline Plan is to provide a conceptual strategy for NASA's Life Sciences Division research and development activities in the comprehensive area of cardiopulmonary sciences. It covers the significant research areas critical to NASA's programmatic requirements for the Extended-Duration Orbiter, Space Station Freedom, and exploration mission science activities. These science activities include ground-based and flight; basic, applied, and operational; and animal and human research and development. This document summarizes the current status of the program, outlines available knowledge, establishes goals and objectives, identifies science priorities, and defines critical questions in the subdiscipline areas of both cardiovascular and pulmonary function. It contains a general plan that will be used by both NASA Headquarters Program Offices and the field centers to review and plan basic, applied, and operational (intramural and extramural) research and development activities in this area.
Faye, M
2013-01-01
This article looks to dispel the mysteries of the 'black art' of Medical Operational Planning whilst giving an overview of activity within the Medical Operational Capability area of Medical Division (Med Div) within Navy Command Headquarters (NCHQ) during a period when the Royal Naval Medical Services (RNMS) have been preparing and reconfiguring medical capability for the future contingent battle spaces. The rolling exercise program has been used to illustrate the ongoing preparations taken by the Medical Operational Capability (Med Op Cap) and the Medical Force Elements to deliver medical capability in the littoral and maritime environments.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoffman, Greg; Marotz, Brian L.; Dunnigan, James
''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biologicalmore » effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.« less
Idaho National Laboratory Site Pollution Prevention Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
E. D. Sellers
2007-03-01
It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Managementmore » System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively managed by the INL Site P2 Coordinator. Development and maintenance of this overall INL Site plan is ultimately the responsibility of DOE-ID. This plan is applicable to all INL Site contractors except those at the Naval Reactors Facility.« less
Financial Management: A Growing Concern for Child Nutrition Program Administrators.
ERIC Educational Resources Information Center
Cater, Jerry B.; Mann, Nadine; Conklin, Martha
1999-01-01
A study of revenue-generation and cost-control measures currently employed at four school districts operating financially successful child-nutrition programs disclosed the importance of student participation to each program's financial integrity. Financial reports, productivity monitoring, and procurement plans to curb food costs were also…
Commercial Foods and Culinary Arts. Florida Vocational Program Guide.
ERIC Educational Resources Information Center
University of South Florida, Tampa. Dept. of Adult and Vocational Education.
This guide identifies considerations in the organization, operation, and evaluation of secondary and postsecondary vocational education programs. It contains both a vocational program guide and Career Merit Achievement Plan (Career MAP) for commercial foods and culinary arts. The guide contains the following sections: occupational description;…
Code of Federal Regulations, 2013 CFR
2013-10-01
...) The extent to which the program would involve innovative teaching techniques; (3) The availability of... and teaching and is allowed to participate in the planning, organization, operation, and evaluation of... program; (10) The adequacy of the methods for monitoring and evaluating the program on a continuing basis...
Code of Federal Regulations, 2012 CFR
2012-10-01
...) The extent to which the program would involve innovative teaching techniques; (3) The availability of... and teaching and is allowed to participate in the planning, organization, operation, and evaluation of... program; (10) The adequacy of the methods for monitoring and evaluating the program on a continuing basis...
Code of Federal Regulations, 2014 CFR
2014-10-01
...) The extent to which the program would involve innovative teaching techniques; (3) The availability of... and teaching and is allowed to participate in the planning, organization, operation, and evaluation of... program; (10) The adequacy of the methods for monitoring and evaluating the program on a continuing basis...
An Analog Rover Exploration Mission for Education and Outreach
NASA Astrophysics Data System (ADS)
Moores, John; Campbell, Charissa L.; Smith, Christina L.; Cooper, Brittney A.
2017-10-01
This abstract describes an analog rover exploration mission designed as an outreach program for high school and undergraduate students. This program is used to teach them about basic mission control operations, how to manage a rover as if it were on another planetary body, and employing the rover remotely to complete mission objectives. One iteration of this program has been completed and another is underway. In both trials, participants were shown the different operation processes involved in a real-life mission. Modifications were made to these processes to decrease complexity and better simulate a mission control environment in a short time period (three 20-minute-long mission “days”). In the first run of the program, participants selected a landing site, what instruments would be on the rover - subject to cost, size, and weight limitations - and were randomly assigned one of six different mission operations roles, each with specific responsibilities. For example, a Science Planner/Integrator (SPI) would plan science activities whilst a Rover Engineer (RE) would keep on top of rover constraints. Planning consisted of a series of four meetings to develop and verify the current plan, pre-plan the next day's activities and uplink the activities to the “rover” (a human colleague). Participants were required to attend certain meetings depending upon their assigned role. To conclude the mission, students viewed the site to understand any differences between remote viewing and reality in relation to the rover. Another mission is currently in progress with revisions from the earlier run to improve the experience. This includes broader roles and meetings and pre-selecting the landing site and rover. The new roles are: Mission Lead, Rover Engineer and Science Planner. The SPI role was previously popular so most of the students were placed in this category. The meetings were reduced to three but extended in length. We are also planning to integrate this program into the Ontario Science Center (OSC) to educate and fascinate people of all ages.
Status and plans of NASA's Materials Science and Manufacturing in Space (MS/MS) program
NASA Technical Reports Server (NTRS)
Armstrong, W. O.; Bredt, J. H.
1972-01-01
A description is given of a research and development program on the space shuttle mission designed to prepare the way for possible commercial manufacturing operations on permanently orbiting space stations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS ENVIRONMENTAL QUALITY INCENTIVES PROGRAM General Provisions... promote agricultural production, forest management, and environmental quality as compatible goals, and to... program are achieved by planning and implementing conservation practices on eligible land. (b) EQIP is...
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS ENVIRONMENTAL QUALITY INCENTIVES PROGRAM General Provisions... promote agricultural production, forest management, and environmental quality as compatible goals, and to... program are achieved by planning and implementing conservation practices on eligible land. (b) EQIP is...
Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.
1994-08-01
This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65.more » The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.« less
Space Station Freedom operations planning
NASA Technical Reports Server (NTRS)
Smith, Kevin J.
1988-01-01
This paper addresses the development of new planning methodologies which will evolve to serve the Space Station Freedom program; these planning processes will focus on the complex task of effectively managing the resources provided by the Space Station Freedom and will be made available to the diverse international community of space station users in support of their ongoing investigative activities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schuster, E.G.; Jones, J.G.; Meacham, M.L.
1995-08-01
Presents a guide to operation and interpretation of TSPAS Sale Program (TSPAS SP), a menu-driven computer program that is one of two programs in the Timber Sale Planning and Analysis System. TSPAS SP is intended to help field teams design and evaluate timber sale alternatives. TSPAS SP evaluate current and long-term timber implications along with associated nontimber outputs. Features include multiple entries and products, real value change, and graphical input. Guide includes user instructions, a glossary, a listing of data needs, and an explanation of error messages.
ERIC Educational Resources Information Center
Astle, Judy Hughes
2001-01-01
A summer camp expanded into year-round operation one step at a time. Initial steps included identifying the camp mission, history, and assets. Successive steps became larger and included expanding the program within the mission, increasing marketing efforts, developing natural resources, creating plans for maintenance and improvements, and…
Automated Sequence Generation Process and Software
NASA Technical Reports Server (NTRS)
Gladden, Roy
2007-01-01
"Automated sequence generation" (autogen) signifies both a process and software used to automatically generate sequences of commands to operate various spacecraft. The autogen software comprises the autogen script plus the Activity Plan Generator (APGEN) program. APGEN can be used for planning missions and command sequences.
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
Integrated flexible manufacturing program for manufacturing automation and rapid prototyping
NASA Technical Reports Server (NTRS)
Brooks, S. L.; Brown, C. W.; King, M. S.; Simons, W. R.; Zimmerman, J. J.
1993-01-01
The Kansas City Division of Allied Signal Inc., as part of the Integrated Flexible Manufacturing Program (IFMP), is developing an integrated manufacturing environment. Several systems are being developed to produce standards and automation tools for specific activities within the manufacturing environment. The Advanced Manufacturing Development System (AMDS) is concentrating on information standards (STEP) and product data transfer; the Expert Cut Planner system (XCUT) is concentrating on machining operation process planning standards and automation capabilities; the Advanced Numerical Control system (ANC) is concentrating on NC data preparation standards and NC data generation tools; the Inspection Planning and Programming Expert system (IPPEX) is concentrating on inspection process planning, coordinate measuring machine (CMM) inspection standards and CMM part program generation tools; and the Intelligent Scheduling and Planning System (ISAPS) is concentrating on planning and scheduling tools for a flexible manufacturing system environment. All of these projects are working together to address information exchange, standardization, and information sharing to support rapid prototyping in a Flexible Manufacturing System (FMS) environment.
Business planning for university health science programs: a case study.
Austin, Michael; Milos, Nadine; Raborn, G Wayne
2002-02-01
Many publicly funded education programs and organizations have developed business plans to enhance accountability. In the case of the Department of Dentistry at the University of Alberta, the main impetus for business planning was a persistent deficit in the annual operating fund since a merger of a stand-alone dental faculty with the Faculty of Medicine. The main challenges were to balance revenues with expenditures, to reduce expenditures without compromising quality of teaching, service delivery and research, to maintain adequate funding to ensure future competitiveness, and to repay the accumulated debt owed to the university. The business plan comprises key strategies in the areas of education, clinical practice and service, and research. One of the strategies for education was to start a BSc program in dental hygiene, which was accomplished in September 2000. In clinical practice, a key strategy was implementation of a clinic operations fee, which also occurred in September 2000. This student fee helps to offset the cost of clinical practice. In research, a key strategy has been to strengthen our emphasis on prevention technologies. In completing the business plan, we learned the importance of identifying clear goals and ensuring that the goals are reasonable and achievable; gaining access to high-quality data to support planning; and nurturing existing positive relationships with external stakeholders such as the provincial government and professional associations.
40 CFR 141.804 - Aircraft water system operations and maintenance plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... calendar quarter of initial operation of the aircraft. (e) Any changes to the aircraft water system... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Aircraft water system operations and...) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Aircraft Drinking Water Rule...
40 CFR 141.804 - Aircraft water system operations and maintenance plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... calendar quarter of initial operation of the aircraft. (e) Any changes to the aircraft water system... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Aircraft water system operations and...) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Aircraft Drinking Water Rule...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-14
... Objection to Federal Operating Permit for American Electric Power Service Corporation, Southwest Electric... object to the American Electric Power Service Corporation, Southwest Electric Power Company (AEP... Permits Section, Multimedia Planning and Permitting Division, EPA Region 6, 1445 Ross Avenue, Dallas...
2007-06-01
Superiority. DoD C4ISR Cooperative Research Program, 2000. ( Chomsky , 1962) Noam Chomsky . Syntactic Structures. The Hague, The Netherlands: Mouton & Co...take one of two basic forms, linguistic representations and discourse models (See Chomsky , 1962). Discourse models make explicit the structure not of
29 CFR 1952.361 - Developmental schedule.
Code of Federal Regulations, 2010 CFR
2010-07-01
... provided by the plan: (a) Development of a complete and operating management information and control system... achieve operational status by December 1, 1976. (e) Amendments to basic legislation to become effective by July 1, 1977. (f) Public employee program to become operational by July 1, 1977. [40 FR 57456, Dec. 10...
Repository-based software engineering program: Concept document
NASA Technical Reports Server (NTRS)
1992-01-01
This document provides the context for Repository-Based Software Engineering's (RBSE's) evolving functional and operational product requirements, and it is the parent document for development of detailed technical and management plans. When furnished, requirements documents will serve as the governing RBSE product specification. The RBSE Program Management Plan will define resources, schedules, and technical and organizational approaches to fulfilling the goals and objectives of this concept. The purpose of this document is to provide a concise overview of RBSE, describe the rationale for the RBSE Program, and define a clear, common vision for RBSE team members and customers. The document also provides the foundation for developing RBSE user and system requirements and a corresponding Program Management Plan. The concept is used to express the program mission to RBSE users and managers and to provide an exhibit for community review.