Sample records for program plan

  1. 28 CFR 70.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Revision of budget and program plans. 70... Revision of budget and program plans. (a) The budget plan is the financial expression of the project or... from budget and program plans, and request prior approvals for budget and program plan revisions, in...

  2. 45 CFR 2543.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Revision of budget and program plans. 2543.25... Revision of budget and program plans. (a) The budget plan is the financial expression of the project or... deviations from budget and program plans, and request prior approvals for budget and program plan revisions...

  3. 45 CFR 309.35 - What are the procedures for review of a Tribal IV-D program application, plan or plan amendment?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-D program application, plan or plan amendment? 309.35 Section 309.35 Public Welfare Regulations... ENFORCEMENT (IV-D) PROGRAM Tribal IV-D Program Application Procedures § 309.35 What are the procedures for review of a Tribal IV-D program application, plan or plan amendment? (a) The Secretary will promptly...

  4. Program Planning in Health Professions Education

    ERIC Educational Resources Information Center

    Schmidt, Steven W.; Lawson, Luan

    2018-01-01

    In this chapter, the major concepts from program planning in adult education will be applied to health professions education (HPE). Curriculum planning and program planning will be differentiated, and program development and planning will be grounded in a systems thinking approach.

  5. 20 CFR 632.255 - Program planning.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... that may be characterized as planning and design but not program operation. (c) Expenses incurred in... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program planning. 632.255 Section 632.255... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a...

  6. 34 CFR 74.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Revision of budget and program plans. 74.25 Section 74... Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan...) Recipients are required to report deviations from budget and program plans, and request prior approvals for...

  7. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.« less

  8. Program planning for the community teaching hospital medical library.

    PubMed Central

    McCorkel, J; Cook, V

    1985-01-01

    To respond to the increasing demand for information from medical educators and clinicians and to persuade administrators to purchase the newly available microcomputer library systems, medical librarians in community teaching hospitals may find it useful to engage in intermediate term (for example, five-year) program planning. To increase the probability that the plan which emerges will be implemented, the planning process should fit the organizational nexus. Planning involves needs assessment, prioritized program elements, a written plan, and facilities planning (if applicable), which lead to program implementation. Components of a model program plan are presented. PMID:4027443

  9. Effect of strategic planning education on attitudes and perceptions of independent community pharmacy owners/managers.

    PubMed

    Harrison, Donald L

    2007-01-01

    To assess the impact of formal education program participation on the attitudes and perceptions of independent community pharmacy owners/managers toward strategic planning. Cross-sectional study. United States; June 4-July 30, 2004. Nationwide random sample of 1,250 owners/managers of independent community pharmacies. Mailed survey. Strategic planning formal education program participation. Comprehensiveness of strategic planning. Attitudes and perceptions of owners/managers of independent community pharmacies toward strategic planning. A total of 527 (42.1%) usable questionnaires were returned. Only 124 (23.5%) respondents indicated that they participated in a formal strategic planning education program. However, of the 141 (26.85%) respondents who indicated that they had conducted strategic planning for their community pharmacy, 111 (89.5%) had participated in a formal strategic planning education program. A significant association was detected between formal education program participation and the conducting of strategic planning (P< or =0.0001). Significant differences were observed for all attitudes and perceptions of independent community pharmacy owners/managers toward strategic planning based on program participation (P< or =0.0001). Finally, respondents who indicated that they had participated in a formal education program had a significantly higher comprehensiveness of strategic planning rating than those respondents who did not participate in an educational program (P< or =0.0001). A significant association exists between formal strategic planning education program participation and the conducting of strategic planning by owner/managers of independent community pharmacies, and those participating in such programs have significantly different attitudes and perceptions toward the conducting of strategic planning and have a significantly higher comprehensiveness of strategic planning rating.

  10. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.« less

  11. Implementing corporate wellness programs: a business approach to program planning.

    PubMed

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  12. 14 CFR 1260.125 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Revision of budget and program plans. 1260....125 Revision of budget and program plans. (a) The budget plan is the financial expression of the... required to report deviations from budget and program plans, and request prior approvals for budget and...

  13. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  14. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  15. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  16. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  17. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  18. 24 CFR 84.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Revision of budget and program... and Program Management § 84.25 Revision of budget and program plans. (a) The budget plan is the... required to report deviations from budget and program plans, and request prior approvals for budget and...

  19. Evaluation Planning, Evaluation Management, and Utilization of Evaluation Results within Adult Literacy Campaigns, Programs and Projects (with Implications for Adult Basic Education and Nonformal Education Programs in General). A Working Paper.

    ERIC Educational Resources Information Center

    Bhola, H. S.

    Addressed to professionals involved in program evaluation, this working paper covers various aspects of evaluation planning, including the following: planning as a sociotechnical process, steps in evaluation planning, program planning and implementation versus evaluation planning and implementation, the literacy system and its subsystems, and some…

  20. 43 CFR 12.925 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Revision of budget and program plans. 12... Organizations Post-Award Requirements § 12.925 Revision of budget and program plans. (a) The budget plan is the...) Recipients are required to report deviations from budget and program plans, and request prior approvals for...

  1. Using the Program Sustainability Assessment Tool to Assess and Plan for Sustainability

    PubMed Central

    Mainor, Avia; Moreland-Russell, Sarah; Maier, Ryan C.; Brossart, Laura; Luke, Douglas A.

    2014-01-01

    Implementing and growing a public health program that benefits society takes considerable time and effort. To ensure that positive outcomes are maintained over time, program managers and stakeholders should plan and implement activities to build sustainability capacity within their programs. We describe a 3-part sustainability planning process that programs can follow to build their sustainability capacity. First, program staff and stakeholders take the Program Sustainability Assessment Tool to measure their program’s sustainability across 8 domains. Next, managers and stakeholders use results from the assessment to inform and prioritize sustainability action planning. Lastly, staff members implement the plan and keep track of progress toward their sustainability goals. Through this process, staff can more holistically address the internal and external challenges and pressures associated with sustaining a program. We include a case example of a chronic disease program that completed the Program Sustainability Assessment Tool and engaged in program sustainability planning. PMID:24456644

  2. 45 CFR 309.35 - What are the procedures for review of a Tribal IV-D program application, plan or plan amendment?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) The effective date of a plan or plan amendment may not be earlier than the first day of the fiscal... program application, plan or plan amendment? 309.35 Section 309.35 Public Welfare Regulations Relating to... of a Tribal IV-D program application, plan or plan amendment? (a) The Secretary will promptly review...

  3. 20 CFR 632.255 - Program planning.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a)(1) In developing the summer program, the Native American grantee shall coordinate the summer plan..., except that 45 days prior to the beginning of the summer program and 45 days after the summer program...

  4. 20 CFR 632.255 - Program planning.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a)(1) In developing the summer program, the Native American grantee shall coordinate the summer plan..., except that 45 days prior to the beginning of the summer program and 45 days after the summer program...

  5. Logistics planning for phased programs.

    NASA Technical Reports Server (NTRS)

    Cook, W. H.

    1973-01-01

    It is pointed out that the proper and early integration of logistics planning into the phased program planning process will drastically reduce these logistics costs. Phased project planning is a phased approach to the planning, approval, and conduct of major research and development activity. A progressive build-up of knowledge of all aspects of the program is provided. Elements of logistics are discussed together with aspects of integrated logistics support, logistics program planning, and logistics activities for phased programs. Continuing logistics support can only be assured if there is a comprehensive sequential listing of all logistics activities tied to the program schedule and a real-time inventory of assets.

  6. Project MOVE Program Planning Kit.

    ERIC Educational Resources Information Center

    Farris, Charlotte J.

    This program planning kit contains information and activities on evaluation, change, leadership, and sex stereotyping which provided the basis for planning Project MOVE (Maximizing Options in Vocational Education) programs but which can be generalized and adapted for use in planning other programs. Assumptions ano guidelines based upon theory and…

  7. Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizesmore » current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.« less

  8. FTA multi-year research program plan (FY 2009 - FY 2013).

    DOT National Transportation Integrated Search

    2008-09-01

    The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...

  9. Systems design study of the Pioneer Venus spacecraft. Volume 2. Preliminary program development plan

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The preliminary development plan for the Pioneer Venus program is presented. This preliminary plan treats only developmental aspects that would have a significant effect on program cost. These significant development areas were: master program schedule planning; test planning - both unit and system testing for probes/orbiter/ probe bus; ground support equipment; performance assurance; and science integration Various test planning options and test method techniques were evaluated in terms of achieving a low-cost program without degrading mission performance or system reliability. The approaches studied and the methodology of the selected approach are defined.

  10. 7 CFR 1710.407 - Business plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Business plan. 1710.407 Section 1710.407 Agriculture... Conservation Loan Program § 1710.407 Business plan. An Eligible EE Program must have a business plan for implementing the program. The business plan is expected to have a global perspective on the borrower's energy...

  11. Contracts and Management Services FY 1996 Site Support Program Plan: WBS 6.10.14. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knoll, J.M. Jr.

    1995-09-01

    This is the Contracts and Management Services site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail including cost accounting narrative summary, approved funding budget, and activity detailed description.

  12. 2 CFR 215.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false Revision of budget and program plans. 215.25 Section 215.25 Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET CIRCULARS AND GUIDANCE Reserved... Program Management § 215.25 Revision of budget and program plans. (a) The budget plan is the financial...

  13. 75 FR 70061 - Dealer Floor Plan Pilot Program Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... SMALL BUSINESS ADMINISTRATION Dealer Floor Plan Pilot Program Meeting AGENCY: U.S. Small Business... location, date, time, and agenda for a meeting regarding the Dealer Floor Plan Pilot Program established in... Plan Pilot Program meeting will be held on November 16, 2010 from approximately 9 a.m. to 12 p.m...

  14. Ready to sell our program. Anybody who is interested in learning Indonesian experience is invited to take part in the BKKBN's international training program.

    PubMed

    Suyono, H

    1996-01-01

    The Indonesian Family Planning Program was officially launched in 1970 when President Suharto developed the National Family Planning Coordinating Board (BKKBN) to administrate the national family planning program. The inauguration of the family planning program came at the heels of a special demand by the people with very strong support of the ulama. The program was subsequently developed and expanded into remote areas in 1976. In 1992, a family-based approach to family planning was implemented in which every village family was made responsible for family planning. The program is based upon a very strong political commitment at the highest level as well as at the provincial, district, subdistrict, and village levels; it continuously innovates; every community can name its family planning program as it likes; and there is constant feedback to the community. Indonesia's family planning program strategies are as follows: it is suggested that couples in which the wife is aged 20-30 years have only two children; it is recommended that women over age 30 have no more children due to the comparatively high risks of pregnancy at that age; considerable effort is given to encourage youths to not become pregnant and bear children; numerous chairmen of small community family planning groups are appointed; and social and cultural conditions have been created in which people work for family planning activities. People interested in learning from the Indonesian experience in family planning may participate in the BKKBN's international training program.

  15. 30 CFR 75.161 - Plans for training programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Plans for training programs. 75.161 Section 75... Provision] § 75.161 Plans for training programs. Each operator must submit to the district manager, of the Coal Mine Safety and Health District in which the mine is located, a program or plan setting forth what...

  16. Beyond Instruction. Comprehensive Program Planning for Business and Education. Jossey-Bass Business and Management Series.

    ERIC Educational Resources Information Center

    Rothwell, William J.; Cookson, Peter S.

    This book introduces key issues in program planning as practiced in business and educational settings. Two chapters in part 1 introduce two foundational models--Lifelong Education Program Planning (LEPP) model and Contingency-Based Program Planning--and provide background on models designed by Houle, Knowles, Boyle, and Nadler. Parts 2-5 focus on…

  17. Planning for Life. A Compendium of Nationally Recognized Career Planning Programs.

    ERIC Educational Resources Information Center

    National Consortium of State Career Guidance Supervisors, Columbus, OH.

    This compendium, which is designed to provide readers with a variety of career planning (CP) program ideas, contains abstracts summarizing 10 elementary, middle, and high school CP programs identified as exemplary by a national review team. Explained in chapter 1 are the primary objectives of the Planning for Life program, which is jointly…

  18. 20 CFR 653.112 - State agency program budget plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false State agency program budget plans. 653.112... State agency program budget plans. (a) Each State agency, in its annual program budget plan, shall... and Budget under control number 1205-0039) (Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et seq...

  19. Advanced rural transportation systems (ARTS) : rural intelligent transportation systems (ITS) : program plan

    DOT National Transportation Integrated Search

    1996-08-01

    This Program Plan for the Advanced Rural Transportation Systems (ARTS) implements the goals and objectives established in the U.S. Department of Transportations (USDOTs) Strategic Plan for the ARTS. This Program Plan proposes five years (FY 97...

  20. The NIE Home-Based Early Education Program.

    ERIC Educational Resources Information Center

    Gruskin, Susan

    The initial plans for the National Institute of Education (NIE) program in early childhood education are described. The first part of the document contains a discussion of the relationship between planned NIE programs and existing early childhood federal programs. In both planned and existing programs, disadvantaged children are the primary…

  1. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  2. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  3. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  4. 45 CFR 235.62 - State plan requirements for training programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (ASSISTANCE PROGRAMS), ADMINISTRATION FOR CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATION OF FINANCIAL ASSISTANCE PROGRAMS § 235.62 State plan requirements for training programs. A State... 45 Public Welfare 2 2010-10-01 2010-10-01 false State plan requirements for training programs. 235...

  5. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  6. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  7. Manual for Preparing Individualized Education Programs.

    ERIC Educational Resources Information Center

    Baylor, Terrill D.

    Presented are guidelines for developing an individualized program and services plan, an individual implementation plan, and daily activity and strategy plans for handicapped students. Instructions are outlined for utilizing forms related to planning and implementation of individualized education programs. Appended are sample forms. (SBH)

  8. Measuring the Implementation Fidelity of Student Affairs Programs: A Critical Component of the Outcomes Assessment Cycle

    ERIC Educational Resources Information Center

    Gerstner, Jerusha J.; Finney, Sara J.

    2013-01-01

    Implementation fidelity assessment provides a means of measuring the alignment between the planned program and the implemented program. Unfortunately, the implemented program can differ from the planned program, resulting in ambiguous inferences about the planned program's effectiveness (i.e., it is uncertain if poor results are due to an…

  9. Training at a faith-based institution matters for obstetrics and gynecology residents: results from a regional survey.

    PubMed

    Guiahi, Maryam; Westhoff, Carolyn L; Summers, Sondra; Kenton, Kimberly

    2013-06-01

    Prior data suggest that opportunities in family planning training may be limited during obstetrics and gynecology (Ob-Gyn) residency training, particularly at faith-based institutions with moral and ethical constraints, although this aspect of the Ob-Gyn curriculum has not been formally studied to date. We compared Ob-Gyn residents' self-rated competency and intentions to provide family planning procedures at faith-based versus those of residents at non-faith-based programs. We surveyed residents at all 20 Ob-Gyn programs in Illinois, Indiana, Iowa, and Wisconsin from 2008 to 2009. Residents were queried about current skills and future plans to perform family planning procedures. We examined associations based on program and residents' personal characteristics and performed multivariable logistic regression analysis. A total of 232 of 340 residents (68%) from 17 programs (85%) returned surveys. Seven programs were faith-based. Residents from non-faith-based programs were more likely to be completely satisfied with family planning training (odds ratio [OR]  =  3.4, 95% confidence limit [CI], 1.9-6.2) and to report they "understand and can perform on own" most procedures. Most residents, regardless of program type, planned to provide all surveyed family planning services. Despite similar intentions to provide family planning procedures after graduation, residents at faith-based training programs were less satisfied with their family planning training and rate their ability to perform family planning services lower than residents at non-faith-based training programs.

  10. How Strategic Planning Keeps You Sane when Delivering Distance Programs

    ERIC Educational Resources Information Center

    MacNeil, Dixie; Luzius, Kim; Dunkin, Sonya

    2010-01-01

    This paper details the advantages of creating a strategic plan in the development and delivery of distance programs at the authors' own institution. The steps involved in the planning process and the three key elements of a successful strategic plan are addressed. The key elements include a program plan explaining the roles/responsibilities of…

  11. Comparison of optimization algorithms in intensity-modulated radiation therapy planning

    NASA Astrophysics Data System (ADS)

    Kendrick, Rachel

    Intensity-modulated radiation therapy is used to better conform the radiation dose to the target, which includes avoiding healthy tissue. Planning programs employ optimization methods to search for the best fluence of each photon beam, and therefore to create the best treatment plan. The Computational Environment for Radiotherapy Research (CERR), a program written in MATLAB, was used to examine some commonly-used algorithms for one 5-beam plan. Algorithms include the genetic algorithm, quadratic programming, pattern search, constrained nonlinear optimization, simulated annealing, the optimization method used in Varian EclipseTM, and some hybrids of these. Quadratic programing, simulated annealing, and a quadratic/simulated annealing hybrid were also separately compared using different prescription doses. The results of each dose-volume histogram as well as the visual dose color wash were used to compare the plans. CERR's built-in quadratic programming provided the best overall plan, but avoidance of the organ-at-risk was rivaled by other programs. Hybrids of quadratic programming with some of these algorithms seems to suggest the possibility of better planning programs, as shown by the improved quadratic/simulated annealing plan when compared to the simulated annealing algorithm alone. Further experimentation will be done to improve cost functions and computational time.

  12. User-Side Subsidy Programs for Special Needs Transportation : A Planning Handbook

    DOT National Transportation Integrated Search

    1983-06-01

    This handbook, first of a series, provides guidance for designing and implementing a user-side subsidy program. The book is divided into two parts--Program Planning and Program Implementation. The Planning section covers six areas--Goals and Objectiv...

  13. 5 CFR 720.205 - Agency plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the Federal civil service system and a description of recruitment programs developed to increase... program plans and should be developed with full consideration of the agency's overall recruiting and...) AFFIRMATIVE EMPLOYMENT PROGRAMS Federal Equal Opportunity Recruitment Program § 720.205 Agency plans. (a) Each...

  14. Influence of PPB on Capital Budgeting.

    ERIC Educational Resources Information Center

    Ellis, Arthur E.

    This talk is divided into two parts: Part one covers Planning, Programming and Budgeting for Capital Programs. Part two is a brief description of the Coho Salmon Program and how Program Planning and Budgeting in both the operation program and the capital phase was used to develop the Salmon Fishing Industry in Michigan. The planning process…

  15. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  16. Alabama Commission on Higher Education 1986 Annual Report.

    ERIC Educational Resources Information Center

    Alabama State Commission on Higher Education, Montgomery.

    The 1986 annual report outlines planning and coordination activities and student financial aid programs. The following planning and coordination activities are considered: statewide planning and facilities planning, a new program approval procedure, approval of off-campus offerings, studies of the state's engineering programs and needs and allied…

  17. 7 CFR 3430.1007 - Planning activities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ADMINISTRATIVE PROVISIONS Sun Grant Program § 3430.1007 Planning activities. (a) Required plan. The Centers and... program. Proposals submitted to the Sun Grant Program must be sufficiently detailed and of high enough...

  18. 7 CFR 3430.1007 - Planning activities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ADMINISTRATIVE PROVISIONS Sun Grant Program § 3430.1007 Planning activities. (a) Required plan. The Centers and... program. Proposals submitted to the Sun Grant Program must be sufficiently detailed and of high enough...

  19. 7 CFR 3430.1007 - Planning activities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ADMINISTRATIVE PROVISIONS Sun Grant Program § 3430.1007 Planning activities. (a) Required plan. The Centers and... program. Proposals submitted to the Sun Grant Program must be sufficiently detailed and of high enough...

  20. 7 CFR 3430.1007 - Planning activities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ADMINISTRATIVE PROVISIONS Sun Grant Program § 3430.1007 Planning activities. (a) Required plan. The Centers and... program. Proposals submitted to the Sun Grant Program must be sufficiently detailed and of high enough...

  1. Performance-based planning and programming guidebook.

    DOT National Transportation Integrated Search

    2013-09-01

    "Performance-based planning and programming (PBPP) refers to the application of performance management principles within the planning and programming processes of transportation agencies to achieve desired performance outcomes for the multimodal tran...

  2. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  3. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  4. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  5. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  6. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  7. [Diversification is the financial alternative for family planning].

    PubMed

    Castro Villamil, R

    1991-12-01

    During the 1960s, when family planning services were institutionalized in Colombia by PROFAMILIA, abundant foreign assistance was readily available. Few questions were asked about the longterm funding of family planning programs or the need for financial self-sufficiency. The emphasis was on program development without great attention to costs. Beginning around the early 1980s, international donors began to place a higher priority and greater investment in the incipient family planning programs of less developed countries. At present a greater number and higher quality of services are being demanded from PROFAMILIA at the lowest possible cost. Efficiency has replaced efficacy as the overriding goal. PROFAMILIA, due to its excellent results, has lost priority in the eyes of international donors. It has therefore reoriented its financing strategies toward a short, medium, and long term plan to reduce its financial dependence on international donor agencies. Self-sufficiency could be increased through various means, including total government subsidy, charging fees for services and materials sufficient to cover program costs, establishing services and marketing programs aside from family planning programs for the specific purpose of obtaining funds to cover program deficits, or establishing accounting and operational controls to reduce costs through greater efficiency. But large government subsidies are unlikely in a time of budgetary constraints, and raising fees for family planning users would exclude a large number of low-income clients from the family planning program. Cost reduction and implementation of diversified programs should therefore be emphasized for the present. The diversified program should be related to family planning so that use can be made of idle resources. PROFAMILIA has emphasized surgical procedures and medical consultations to utilize clinic facilities more fully and to increase income without increasing fixed costs. In 1990, foreign donations accounted for 47.3% of PROFAMILIA income and PROFAMILIA contributed the rest. 18.1% came from family planning activities, 20.2% from surgical procedures, consultations, sales of medications, and laboratory services, and 20.2% from service contracts, national donations, interest, and other sources. In the same year, family planning programs accounted for 68.9% of expenditures, diversification programs for 11.5%, technical assistance for 8.6%, and administration for 11%. The income and expenditure data indicate that the diversification programs make a significant financial contribution to the family planning program, at the same time reducing dependency on international donor agencies.

  8. 49 CFR 659.19 - System safety program plan: contents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...

  9. 49 CFR 659.19 - System safety program plan: contents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...

  10. 49 CFR 659.19 - System safety program plan: contents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...

  11. 49 CFR 659.19 - System safety program plan: contents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...

  12. 49 CFR 659.19 - System safety program plan: contents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...

  13. 34 CFR 200.27 - Development of a schoolwide program plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...

  14. 34 CFR 200.27 - Development of a schoolwide program plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...

  15. 34 CFR 200.27 - Development of a schoolwide program plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...

  16. 34 CFR 200.27 - Development of a schoolwide program plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...

  17. A Guide to Program Planning Vol. II.

    ERIC Educational Resources Information Center

    Allen, Earl, Sr.

    This booklet is a simplified guide for program planning and is intended to complement a somewhat lengthier companion booklet on program evaluation. It spells out in outline fashion the basic elements and steps involved in the planning process. Brief sections focus in turn on different phases of the planning process, including problem…

  18. ISS Payload Operations: The Need for and Benefit of Responsive Planning

    NASA Technical Reports Server (NTRS)

    Nahay, Ed; Boster, Mandee

    2000-01-01

    International Space Station (ISS) payload operations are controlled through implementation of a payload operations plan. This plan, which represents the defined approach to payload operations in general, can vary in terms of level of definition. The detailed plan provides the specific sequence and timing of each component of a payload's operations. Such an approach to planning was implemented in the Spacelab program. The responsive plan provides a flexible approach to payload operations through generalization. A responsive approach to planning was implemented in the NASA/Mir Phase 1 program, and was identified as a need during the Skylab program. The current approach to ISS payload operations planning and control tends toward detailed planning, rather than responsive planning. The use of detailed plans provides for the efficient use of limited resources onboard the ISS. It restricts flexibility in payload operations, which is inconsistent with the dynamic nature of the ISS science program, and it restricts crew desires for flexibility and autonomy. Also, detailed planning is manpower intensive. The development and implementation of a responsive plan provides for a more dynamic, more accommodating, and less manpower intensive approach to planning. The science program becomes more dynamic and responsive as the plan provides flexibility to accommodate real-time science accomplishments. Communications limitations and the crew desire for flexibility and autonomy in plan implementation are readily accommodated with responsive planning. Manpower efficiencies are accomplished through a reduction in requirements collection and coordination, plan development, and maintenance. Through examples and assessments, this paper identifies the need to transition from detailed to responsive plans for ISS payload operations. Examples depict specific characteristics of the plans. Assessments identify the following: the means by which responsive plans accommodate the dynamic nature of science programs and the crew desire for flexibility; the means by which responsive plans readily accommodate ISS communications constraints; manpower efficiencies to be achieved through use of responsive plans; and the implications of responsive planning relative to resource utilization efficiency.

  19. National Civil Applications Program: strategic plan vision for 2005

    USGS Publications Warehouse

    ,

    2004-01-01

    The National Mapping Division (NMD) has developed this comprehensive strategic plan to chart the course of the National Civil Applications Program (NCAP) over the next 5 years. To meet the challenges of the future, the NCAP is changing its program emphases, methods of responding to customer needs, and business practices. The NCAP Strategic Plan identifies the new direction for the program through a series of strategic thrusts and goals for managers to use in formulating plans, establishing program emphases, and determining resource needs and allocations.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, Barbara L.

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  1. Individualized Program Planning (IPP): ECS to Grade 12. Programming for Students with Special Needs

    ERIC Educational Resources Information Center

    Online Submission, 2006

    2006-01-01

    This resource is a revision of the teaching resource Individualized Program Plans (1995), Book 3 (ED392232) in the Programming for Students with Special Needs series. It aims to create a bridge between the product, the process and the underlying vision of Individualized Program Planning (IPP). The Standards for Special Education (Amended June…

  2. 23 CFR 450.208 - Coordination of planning process activities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.208... transportation operators to support statewide transportation planning and programming priorities and decisions...

  3. 23 CFR 450.208 - Coordination of planning process activities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.208... transportation operators to support statewide transportation planning and programming priorities and decisions...

  4. 23 CFR 450.208 - Coordination of planning process activities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.208... transportation operators to support statewide transportation planning and programming priorities and decisions...

  5. Site support program plan for ICF Kaiser Hanford Company

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dieterle, S.E.

    1996-09-27

    The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.

  6. Health plans' disease management programs: extending across the medical and behavioral health spectrum?

    PubMed

    Merrick, Elizabeth Levy; Horgan, Constance M; Garnick, Deborah W; Hodgkin, Dominic; Morley, Melissa

    2008-01-01

    Although the disease management industry has expanded rapidly, there is little nationally representative data regarding medical and behavioral health disease management programs at the health plan level. National estimates from a survey of private health plans indicate that 90% of health plan products offered disease management for general medical conditions such as diabetes but only 37% had depression programs. The frequency of specific depression disease management activities varied widely. Program adoption was significantly related to product type and behavioral health contracting. In health plans, disease management has penetrated more slowly into behavioral health and depression program characteristics are highly variable.

  7. Health Plans' Disease Management Programs: Extending across the Medical and Behavioral Health Spectrum?

    PubMed Central

    Merrick, Elizabeth Levy; Horgan, Constance M.; Garnick, Deborah W.; Hodgkin, Dominic; Morley, Melissa

    2015-01-01

    While the disease management industry has expanded rapidly, there is little nationally representative data regarding medical and behavioral health disease management programs at the health plan level. National estimates from a survey of private health plans indicate that 90% of health plan products offered disease management for general medical conditions such as diabetes, but only 37% had depression programs. The frequency of specific depression disease management activities varied widely. Program adoption was significantly related to product type and behavioral health contracting. In health plans, disease management has penetrated more slowly into behavioral health, and depression program characteristics are highly variable. PMID:18806594

  8. Program Planning Concepts in Solid Waste Management

    ERIC Educational Resources Information Center

    Brown, Sanford M., Jr.

    1972-01-01

    Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)

  9. 22 CFR 518.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 518.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the...

  10. Quality assurance program plan for radionuclide airborne emissions monitoring

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boom, R.J.

    1995-12-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of radiological airborne emissions. This Quality Assurance Program Plan is prepared in accordance with and to written requirements.

  11. Scheduling language and algorithm development study. Volume 2, phase 2: Introduction to plans programming. [user guide

    NASA Technical Reports Server (NTRS)

    Cochran, D. R.; Ishikawa, M. K.; Paulson, R. E.; Ramsey, H. R.

    1975-01-01

    A user guide for the Programming Language for Allocation and Network Scheduling (PLANS) is presented. Information is included for the construction of PLANS programs. The basic philosophy of PLANS is discussed, and access and update reference techniques are described along with the use of tree structures.

  12. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall be...

  13. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall be...

  14. Phase C/D program development plan. Volume 1: Program plan

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.

  15. U.S. Climate Change Science Program. Vision for the Program and Highlights of the Scientific Strategic Plan

    NASA Technical Reports Server (NTRS)

    2003-01-01

    The vision document provides an overview of the Climate Change Science Program (CCSP) long-term strategic plan to enhance scientific understanding of global climate change.This document is a companion to the comprehensive Strategic Plan for the Climate Change Science Program. The report responds to the Presidents direction that climate change research activities be accelerated to provide the best possible scientific information to support public discussion and decisionmaking on climate-related issues.The plan also responds to Section 104 of the Global Change Research Act of 1990, which mandates the development and periodic updating of a long-term national global change research plan coordinated through the National Science and Technology Council.This is the first comprehensive update of a strategic plan for U.S. global change and climate change research since the origal plan for the U.S. Global Change Research Program was adopted at the inception of the program in 1989.

  16. The Role of Public-Sector Family Planning Programs in Meeting the Demand for Contraception in Sub-Saharan Africa.

    PubMed

    Bongaarts, John; Hardee, Karen

    2017-06-01

    Commonly used indicators of contraceptive behavior in a population-modern contraceptive prevalence (mCPR), unmet need for contraception, demand for contraception and demand satisfied-are not well-suited for evaluating the progress made by government family planning programs in helping women and men achieve their reproductive goals. Trends in these measures in 26 Sub-Saharan African countries between 1990 and 2014 were examined. Trends in a proposed new indicator, the public-sector family planning program impact score (PFPI), and its relationship to mCPR and the family planning effort score were also assessed. Case studies were used to review public family planning program development and implementation in four countries (Nigeria, Ethiopia, Rwanda and Kenya). The four commonly used indicators capture the extent to which women use family planning and to which demand is satisfied, but shed no direct light on the role of family planning programs. PFPI provides evidence that can be used to hold governments accountable for meeting the demand for family planning, and was closely related to policy developments in the four case-study countries. PFPI provides a useful addition to the indicators currently used to assess progress in reproductive health and family planning programs.

  17. Software for Optimizing Plans Involving Interdependent Goals

    NASA Technical Reports Server (NTRS)

    Estlin, Tara; Gaines, Daniel; Rabideau, Gregg

    2005-01-01

    A computer program enables construction and optimization of plans for activities that are directed toward achievement of goals that are interdependent. Goal interdependence is defined as the achievement of one or more goals affecting the desirability or priority of achieving one or more other goals. This program is overlaid on the Automated Scheduling and Planning Environment (ASPEN) software system, aspects of which have been described in a number of prior NASA Tech Briefs articles. Unlike other known or related planning programs, this program considers interdependences among goals that can change between problems and provides a language for easily specifying such dependences. Specifications of the interdependences can be formulated dynamically and provided to the associated planning software as part of the goal input. Then an optimization algorithm provided by this program enables the planning software to reason about the interdependences and incorporate them into an overall objective function that it uses to rate the quality of a plan under construction and to direct its optimization search. In tests on a series of problems of planning geological experiments by a team of instrumented robotic vehicles (rovers) on new terrain, this program was found to enhance plan quality.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, Barbara L.

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, Barbara L.

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  20. Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan

    NASA Technical Reports Server (NTRS)

    Zeidler, Janet

    1999-01-01

    Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.

  1. Proceedings of the HEA Title II-B Institute on Continuing Education Program Planning for Library Staffs in the Southwest, March 17-28, 1975.

    ERIC Educational Resources Information Center

    Foos, Donald D., Comp.

    The proceedings of the Institute on Continuing Education Program Planning for Library Staffs in the Southwest contain historical and state-of-the-art information, needs assessments, program planning information, program descriptions and the Continuing Education for Library Staff program. The continuing education needs of medical, school, special,…

  2. 78 FR 7476 - Airport Improvement Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-01

    ... of Airport Planning and Programming, Financial Assistance Division has updated and significantly.... San Martin, Manager, Airports Financial Assistance Division, Office of Airport Planning and... Airports, Airport Planning and Programming, Routing Symbol APP-501, 800 Independence Avenue SW., Room 619...

  3. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Programmore » projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.« less

  4. Definition study of a Variable Cycle Experimental Engine (VCEE) and associated test program and test plan

    NASA Technical Reports Server (NTRS)

    Allan, R. D.

    1978-01-01

    The Definition Study of a Variable Cycle Experimental Engine (VCEE) and Associated Test Program and Test Plan, was initiated to identify the most cost effective program for a follow-on to the AST Test Bed Program. The VCEE Study defined various subscale VCE's based on different available core engine components, and a full scale VCEE utilizing current technology. The cycles were selected, preliminary design accomplished and program plans and engineering costs developed for several program options. In addition to the VCEE program plans and options, a limited effort was applied to identifying programs that could logically be accomplished on the AST Test Bed Program VCE to extend the usefulness of this test hardware. Component programs were provided that could be accomplished prior to the start of a VCEE program.

  5. Multicenter Collaborative Quality Assurance Program for the Province of Ontario, Canada: First-Year Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Létourneau, Daniel, E-mail: daniel.letourneau@rmp.uh.on.ca; Department of Radiation Oncology, University of Toronto, Toronto, Ontario; McNiven, Andrea

    2013-05-01

    Purpose: The objective of this work was to develop a collaborative quality assurance (CQA) program to assess the performance of intensity modulated radiation therapy (IMRT) planning and delivery across the province of Ontario, Canada. Methods and Materials: The CQA program was designed to be a comprehensive end-to-end test that can be completed on multiple planning and delivery platforms. The first year of the program included a head-and-neck (H and N) planning exercise and on-site visit to acquire dosimetric measurements to assess planning and delivery performance. A single dosimeter was used at each institution, and the planned to measured dose agreementmore » was evaluated for both the H and N plan and a standard plan (linear-accelerator specific) that was created to enable a direct comparison between centers with similar infrastructure. Results: CQA program feasibility was demonstrated through participation of all 13 radiation therapy centers in the province. Planning and delivery was completed on a variety of infrastructure (treatment planning systems and linear accelerators). The planning exercise was completed using both static gantry and rotational IMRT, and planned-to-delivered dose agreement (pass rates) for 3%/3-mm gamma evaluation were greater than 90% (92.6%-99.6%). Conclusions: All centers had acceptable results, but variation in planned to delivered dose agreement for the same planning and delivery platform was noted. The upper end of the range will provide an achievable target for other centers through continued quality improvement, aided by feedback provided by the program through the use of standard plans and simple test fields.« less

  6. 10 CFR 420.17 - Optional elements of State Energy Program plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Optional elements of State Energy Program plans. 420.17 Section 420.17 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION STATE ENERGY PROGRAM Formula Grant Procedures § 420.17 Optional elements of State Energy Program plans. (a) Other appropriate activities or...

  7. 10 CFR 420.17 - Optional elements of State Energy Program plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Optional elements of State Energy Program plans. 420.17 Section 420.17 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION STATE ENERGY PROGRAM Formula Grant Procedures § 420.17 Optional elements of State Energy Program plans. (a) Other appropriate activities or...

  8. 10 CFR 420.17 - Optional elements of State Energy Program plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Optional elements of State Energy Program plans. 420.17 Section 420.17 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION STATE ENERGY PROGRAM Formula Grant Procedures § 420.17 Optional elements of State Energy Program plans. (a) Other appropriate activities or...

  9. 10 CFR 420.17 - Optional elements of State Energy Program plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Optional elements of State Energy Program plans. 420.17 Section 420.17 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION STATE ENERGY PROGRAM Formula Grant Procedures § 420.17 Optional elements of State Energy Program plans. (a) Other appropriate activities or...

  10. 10 CFR 420.17 - Optional elements of State Energy Program plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Optional elements of State Energy Program plans. 420.17 Section 420.17 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION STATE ENERGY PROGRAM Formula Grant Procedures § 420.17 Optional elements of State Energy Program plans. (a) Other appropriate activities or...

  11. 41 CFR 105-72.305 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management § 105-72.305 Revision of budget and program plans. (a) The budget plan is the financial expression... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Revision of budget and program plans. 105-72.305 Section 105-72.305 Public Contracts and Property Management Federal Property...

  12. Electrician Cluster, STEP Training Plan. Skills Training and Education Program.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Postsecondary Education, Montgomery.

    This guide is a training plan for the electrical skills cluster of the Skills Training and Education Program (STEP), an open-entry, open-exit program funded by the Job Training Partnership Act (JTPA). In the STEP training plan, each task has its own lesson plan guide. This manual contains the following information: definitions, instructions for…

  13. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 4 2011-07-01 2011-07-01 false Affirmative action plans or programs under State or local... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or programs under State or local law. Affirmative action plans...

  14. 29 CFR 1608.7 - Affirmative action plans or programs under State or local law.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Affirmative action plans or programs under State or local... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or programs under State or local law. Affirmative action plans...

  15. Environmental Education in Graduate Professional Degrees: The Case of Urban Planning

    ERIC Educational Resources Information Center

    White, Stacey Swearingen; Mayo, James M.

    2005-01-01

    Environmental education (EE) is a prominent aspect of graduate-level master's programs in urban and regional planning. This article draws on the results of a survey of 66 environmental planning educators in urban and regional planning programs to show what types of EE are most prevalent in these graduate professional programs and in planning…

  16. Clerical Cluster, STEP Training Plan. Skills Training and Education Program.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Postsecondary Education, Montgomery.

    This guide is a training plan for the clerical skills cluster of the Skills Training and Education Program (STEP), an open-entry, open-exit program funded by the Job Training Partnership Act (JTPA). In the STEP training plan, each task has its own lesson plan guide. This manual contains the following information: definitions, instructions for…

  17. 25 CFR 20.202 - What is a tribal redesign plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SOCIAL SERVICES PROGRAMS Welfare Reform § 20.202 What is a tribal redesign plan? If you are a tribe administering a general assistance program, you can develop and submit to us a tribal redesign plan to change the way that you administer the program. (a) A tribal redesign plan allows a tribe to: (1) Change...

  18. Public Relations for Brazilian Libraries: Process, Principles, Program Planning, Planning Techniques and Suggestions.

    ERIC Educational Resources Information Center

    Kies, Cosette N.

    A brief overview of the functions of public relations in libraries introduces this manual, which provides an explanation of the public relations (PR) process, including fact-finding, planning, communicating, evaluating, and marketing; some PR principles; a 10-step program that could serve as a model for planning a PR program; a discussion of PR…

  19. 45 CFR 287.70 - What are the plan requirements for the NEW Program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Tribe will deliver work activities and services. (d) The format is left to the discretion of each NEW... 45 Public Welfare 2 2010-10-01 2010-10-01 false What are the plan requirements for the NEW Program... SERVICES THE NATIVE EMPLOYMENT WORKS (NEW) PROGRAM Plan Requirements § 287.70 What are the plan...

  20. 45 CFR 287.70 - What are the plan requirements for the NEW Program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Tribe will deliver work activities and services. (d) The format is left to the discretion of each NEW... 45 Public Welfare 2 2011-10-01 2011-10-01 false What are the plan requirements for the NEW Program... SERVICES THE NATIVE EMPLOYMENT WORKS (NEW) PROGRAM Plan Requirements § 287.70 What are the plan...

  1. High performance computing and communications: FY 1997 implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-12-01

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A providesmore » a detailed look at HPCC Program activities within each agency.« less

  2. 23 CFR 1200.25 - Improvement plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Implementation and Management of the Highway Safety Program § 1200.25 Improvement plan. If a review of the Annual... improvement plan. This plan will detail strategies, program activities, and funding targets to meet the...

  3. NASA earth science and applications division: The program and plans for FY 1988-1989-1990

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Described here are the Division's research goals, priorities and emphases for the next several years and an outline of longer term plans. Included are highlights of recent accomplishments, current activities in FY 1988, research emphases in FY 1989, and longer term future plans. Data and information systems, the Geodynamics Program, the Land Processes Program, the Oceanic Processes Program, the Atmospheric Dynamics and Radiation Program, the Atmospheric Chemistry Program, and space flight programs are among the topic covered.

  4. Autonomous Vehicle Mission Planning Using AI (Artificial Intelligence) Techniques.

    DTIC Science & Technology

    1985-12-01

    it uses are declarative patterns that encode facts about how goals may give rise to - . plans. The program processes a story a sentence at a time...the planning process. By separating the knowledge about how to plan from the specific domain knowledge, an understander can use this knowledge about how ...path planning program developed in a previous thesis effort will be incorporated into the overall program in order to demonstrate the operating system

  5. Strategic plan, 1985

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The Lewis Strategic Plan was updated for 1985 and beyond. Major programs for the space station, the advanced turboprop, the Advanced Communications Technology Satellite (ACTS), and the Altitude Wind Tunnel were begun or greatly expanded during 1984. In parallel, The Lewis aeropropulsion research and technology program was extensively evaluated and reviewed; a reduced and reoriented program emerged. The thrusts and implementation plans for these programs are described as they pertain to the individual directorates. Other key accomplishments and plans are summarized.

  6. 7 CFR 1210.311 - Programs and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PROMOTION PLAN Watermelon Research and Promotion Plan Definitions § 1210.311 Programs and projects. Programs and projects mean those research, development, advertising, or promotion programs or projects...

  7. San Diego transit five year plan update : FY 1982-1986

    DOT National Transportation Integrated Search

    1981-07-01

    The Five Year Plan Update constitutes the annual revision to the operating plan and capital program for the following five year planning period, presents its adopted budget and a specific operating plan and capital program for FY 1982 as well as less...

  8. SDDOT transportation systems management & operations program plan.

    DOT National Transportation Integrated Search

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  9. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  10. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  11. Domestic, international family planning programs at risk.

    PubMed

    Turnbull, W; Kaeser, L

    1998-02-01

    The US government has subsidized family planning services domestically and abroad for three decades. For most of that period, the support has been provided with the broad-based backing of both US lawmakers and the general public. However, recent polling indicates that public support for family planning programs remains strong, but not necessarily among legislators. Since Republicans gained control of the US House of Representatives in 1995, a well-organized opposition to government-subsidized family planning has developed. The House leadership has launched attacks to defund and abolish Title X, the core domestic family planning program, and the US Agency for International Development's (USAID) population assistance program. Although these attempts failed, a parallel strategy is being pursued to raise anxieties about the programs and chip away at members' support for them. Family planning supporters in Congress and the White House are on the defensive. Rather than fighting for funding increases and new program initiatives, family planning advocates have been forced to try to just hold their ground. Even though they rest intact, Title X and USAID funding has suffered and the programs' base of congressional support has been seriously compromised. With the current Republican domination of the House, Title X and USAID face an uncertain future.

  12. Dynamics of a Successful Planned Giving Program Utilizing Shared Leadership at Historically Black Colleges and Universities (HBCUs)

    ERIC Educational Resources Information Center

    Baldwin, Robin Lynn Brunty

    2013-01-01

    The purpose of this study was to evaluate the dynamics of a successful planned giving program utilizing shared leadership at Historically Black Colleges and Universities (HBCUs). This information will assist the leadership in determining if and how a successful planned giving program can be established for HBCUs. It is possible for planned gifts…

  13. An Economic History of Medicare Part C

    PubMed Central

    Mcguire, Thomas G; Newhouse, Joseph P; Sinaiko, Anna D

    2011-01-01

    Context: Twenty-five years ago, private insurance plans were introduced into the Medicare program with the stated dual aims of (1) giving beneficiaries a choice of health insurance plans beyond the fee-for-service Medicare program and (2) transferring to the Medicare program the efficiencies and cost savings achieved by managed care in the private sector. Methods: In this article we review the economic history of Medicare Part C, known today as Medicare Advantage, focusing on the impact of major changes in the program's structure and of plan payment methods on trends in the availability of private plans, plan enrollment, and Medicare spending. Additionally, we compare the experience of Medicare Advantage and of employer-sponsored health insurance with managed care over the same time period. Findings: Beneficiaries' access to private plans has been inconsistent over the program's history, with higher plan payments resulting in greater choice and enrollment and vice versa. But Medicare Advantage generally has cost more than the traditional Medicare program, an overpayment that has increased in recent years. Conclusions: Major changes in Medicare Advantage's payment rules are needed in order to simultaneously encourage the participation of private plans, the provision of high-quality care, and to save Medicare money. PMID:21676024

  14. 50 CFR 86.130 - What does the State program plan do?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false What does the State program plan do? 86.130 Section 86.130 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE... GRANT (BIG) PROGRAM How States Will Complete the State Program Plans § 86.130 What does the State...

  15. Homemaker-Home Health Aide Program. A Challenge to Vocational Education. A Modified Competency Based Pilot Training Program.

    ERIC Educational Resources Information Center

    Holton, Hazel S.

    This curriculum guide is designed to be used by vocational educators in planning, developing, coordinating, and implementing homemaker-health aide programs. It is divided into three parts. Covered first are various aspects of program planning, including planning and organization, the role of the adult educator and the adult learner, and…

  16. Strategies for Action: An Outline of Factors Which Influence Decisions on Program Plans.

    ERIC Educational Resources Information Center

    Bogue, E. G.

    This paper discusses strategies which can help the admissions officer/registrar be more effective in having his program plans transformed into reality. The program planning process is considered from three prospectives beginning with a brief discussion of the current state of program development in higher education. It is conjectured that the…

  17. Think Warm Thoughts: Plan Ahead for Summertime Information Literacy Programs! The College Connection

    ERIC Educational Resources Information Center

    Kasowitz-Scheer, Abby

    2009-01-01

    It's winter! While it is frosty outside, one can at least think warm thoughts by starting now to plan ahead for summer information literacy programs. This article is designed to provide some ideas for planning next summer's reading, sleuthing, and research programs. It features a variety of programs organized by academic librarians this past…

  18. Theory and models for planning and evaluating institutional influenza prevention and control programs.

    PubMed

    Russell, Margaret L; Thurston, Wilfreda E; Henderson, Elizabeth A

    2003-10-01

    Low rates of staff influenza vaccine coverage occur in many health care facilities. Many programs do not offer vaccination to physicians or to volunteers, and some programs do not measure coverage or do so only for a subset of staff. The use of theory in planning and evaluation may prevent these problems and lead to more effective programs. We discuss the use of theory in the planning and evaluation of health programs and demonstrate how it can be used for the evaluation and planning of a hospital or nursing home influenza control program. The application of theory required explicit statement of the goals of the program and examination of the assumptions underlying potential program activities. This indicated that staff should probably be considered as employees, volunteers, physicians, and contractors of the facility. It also directed attention to evidence-based strategies for increasing vaccination rates. The application of a program planning model to a problem of institutional influenza prevention may prevent planners from excluding important target populations and failing to monitor the important indicators of program success.

  19. 76 FR 19683 - Conservation Program Recipient Reporting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-08

    ... regulation that has application or plan due dates after October 1, 2010. The Watershed Operations and Flood Prevention Program, Emergency Watersheds Protection Program, Healthy Forests Reserve Program, Agricultural Management Assistance Program, and the Conservation Stewardship Program have application or plan due dates...

  20. Metrication report to the Congress

    NASA Technical Reports Server (NTRS)

    1991-01-01

    NASA's principal metrication accomplishments for FY 1990 were establishment of metrication policy for major programs, development of an implementing instruction for overall metric policy and initiation of metrication planning for the major program offices. In FY 1991, development of an overall NASA plan and individual program office plans will be completed, requirement assessments will be performed for all support areas, and detailed assessment and transition planning will be undertaken at the institutional level. Metric feasibility decisions on a number of major programs are expected over the next 18 months.

  1. 20 CFR 632.17 - Planning process.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Planning process. 632.17 Section 632.17... EMPLOYMENT AND TRAINING PROGRAMS Program Planning, Application and Modification Procedures § 632.17 Planning process. (a) Each Native American grantee shall establish a planning process for the development of its...

  2. Ernest Orlando Lawrence Berkeley National Laboratory institutional plan, FY 1996--2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    The FY 1996--2001 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Laboratory Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It alsomore » summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.« less

  3. COMPENSATORY EDUCATION PROGRAM. NEWSLETTER.

    ERIC Educational Resources Information Center

    Fresno City Unified School District, CA.

    TWO NEWSLETTERS FROM THE COMPENSATORY EDUCATION PROGRAM IN FRESNO INCLUDED PLANS FOR THE PLANNING GRANT PROGRAM, THE BASIC PROGRAM, AND THE INTENSIVE PROGRAM. THE BASIC PROGRAM SHOULD REDUCE PUPIL-TEACHER RATIO, PROVIDE PRESCHOOL PROJECTS THROUGH THE USE OF EITHER SCHOOL FACILITIES OR PRIVATE FACILITIES, PROVIDE REMEDIAL AND CORRECTIVE PROGRAMS IN…

  4. Developing Your Evaluation Plans: A Critical Component of Public Health Program Infrastructure.

    PubMed

    Lavinghouze, S Rene; Snyder, Kimberly

    A program's infrastructure is often cited as critical to public health success. The Component Model of Infrastructure (CMI) identifies evaluation as essential under the core component of engaged data. An evaluation plan is a written document that describes how to monitor and evaluate a program, as well as how to use evaluation results for program improvement and decision making. The evaluation plan clarifies how to describe what the program did, how it worked, and why outcomes matter. We use the Centers for Disease Control and Prevention's (CDC) "Framework for Program Evaluation in Public Health" as a guide for developing an evaluation plan. Just as using a roadmap facilitates progress on a long journey, a well-written evaluation plan can clarify the direction your evaluation takes and facilitate achievement of the evaluation's objectives.

  5. 42 CFR 422.4 - Types of MA plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 3 2011-10-01 2011-10-01 false Types of MA plans. 422.4 Section 422.4 Public...) MEDICARE PROGRAM MEDICARE ADVANTAGE PROGRAM General Provisions § 422.4 Types of MA plans. (a) General rule. An MA plan may be a coordinated care plan, a combination of an MA MSA plan and a contribution into an...

  6. 42 CFR 422.4 - Types of MA plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 3 2013-10-01 2013-10-01 false Types of MA plans. 422.4 Section 422.4 Public...) MEDICARE PROGRAM (CONTINUED) MEDICARE ADVANTAGE PROGRAM General Provisions § 422.4 Types of MA plans. (a) General rule. An MA plan may be a coordinated care plan, a combination of an MA MSA plan and a...

  7. 42 CFR 422.4 - Types of MA plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 3 2014-10-01 2014-10-01 false Types of MA plans. 422.4 Section 422.4 Public...) MEDICARE PROGRAM (CONTINUED) MEDICARE ADVANTAGE PROGRAM General Provisions § 422.4 Types of MA plans. (a) General rule. An MA plan may be a coordinated care plan, a combination of an MA MSA plan and a...

  8. 42 CFR 422.4 - Types of MA plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 3 2012-10-01 2012-10-01 false Types of MA plans. 422.4 Section 422.4 Public...) MEDICARE PROGRAM (CONTINUED) MEDICARE ADVANTAGE PROGRAM General Provisions § 422.4 Types of MA plans. (a) General rule. An MA plan may be a coordinated care plan, a combination of an MA MSA plan and a...

  9. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...

  10. Space Station Freedom operations planning

    NASA Technical Reports Server (NTRS)

    Accola, Anne L.; Keith, Bryant

    1989-01-01

    The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.

  11. 45 CFR 74.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan is the financial expression of...

  12. 40 CFR 30.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FEDERAL ASSISTANCE UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 30.25 Revision of budget and program plans. (a) The budget plan is the financial...

  13. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 1 2012-01-01 2012-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  14. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 1 2014-01-01 2014-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  15. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 1 2013-01-01 2013-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  16. Mathematics: Program Assessment and Improvement Planning Manual.

    ERIC Educational Resources Information Center

    Whitman, Nancy C.; And Others

    This document provides a model for assessing a school's mathematics program and planning for program improvement. A systematic process for instructional improvement focuses upon students' needs and the identification of successful instructional strategies to meet these needs. The improvement plan and the implementation of intervention strategies…

  17. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  18. Instructional Program Planning for Outdoor Education.

    ERIC Educational Resources Information Center

    Garbutt, Barbara; And Others

    A guide on instructional program planning for outdoor education, prepared for Oakland County (Michigan) teachers, contains suggestions for program planning and lists information sources on suitable outdoor activities. The purpose of outdoor education is defined as being: "to enrich, vitalize and complement content areas of the school…

  19. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  20. 42 CFR 457.50 - State plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CHILDREN'S HEALTH INSURANCE PROGRAMS (SCHIPs) ALLOTMENTS AND GRANTS TO STATES Introduction; State Plans for Child Health Insurance Programs and Outreach Strategies § 457.50 State plan. The State plan is a... 42 Public Health 4 2010-10-01 2010-10-01 false State plan. 457.50 Section 457.50 Public Health...

  1. 5 CFR 720.304 - Agency plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) AFFIRMATIVE EMPLOYMENT PROGRAMS Disabled Veterans Affirmative Action Program § 720.304 Agency plan. (a) Plan... advancement of disabled veterans. (1) Each agency must review its plan on an annual basis, together with its... advancement of disabled veterans. OPM must be informed when headquarters offices require plans at the field or...

  2. 42 CFR 495.336 - Health information technology planning advance planning document requirements (HIT PAPD).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 5 2011-10-01 2011-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...

  3. 42 CFR 495.336 - Health information technology planning advance planning document requirements (HIT PAPD).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 5 2013-10-01 2013-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...

  4. 42 CFR 495.336 - Health information technology planning advance planning document requirements (HIT PAPD).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 5 2012-10-01 2012-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...

  5. 42 CFR 495.336 - Health information technology planning advance planning document requirements (HIT PAPD).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 5 2014-10-01 2014-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...

  6. 7 CFR 633.9 - Conservation plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Conservation plan. 633.9 Section 633.9 Agriculture... AGRICULTURE LONG TERM CONTRACTING WATER BANK PROGRAM § 633.9 Conservation plan. (a) The program participant... conservation plan for the acreage designated under an agreement. (b) The conservation plan is the basis for the...

  7. Planning for Impact: A Guide to Planning Effective Family Program.

    ERIC Educational Resources Information Center

    Hardy, James M.

    A document intended to provide program planning guidelines for Young Men's Christian Associations (YMCAs) desirous of working with families, recommends adherence to eight principles and following of five steps. The principles involve planning before action, fact finding and analysis, clear delineation of operational objectives, planning at all…

  8. 42 CFR 495.336 - Health information technology planning advance planning document requirements (HIT PAPD).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...

  9. Space tug point design study. Volume 4: Program requirements

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A study was conducted to determine the configuration of a space tug and to predict the performance parameters. The program plans and planning data generated in support of the tug development program are presented. The preliminary plans and supporting planning data emphasize the following requirements: (1) maintenance and refurbishment, (2) technology development, (3) production, (4) test facilities, (5) quality control, and (6) scheduling.

  10. Preparation of the Program Objectives Memorandum: A Selective Examination of Procedures in the Department of the Navy.

    DTIC Science & Technology

    1986-06-01

    THE NAVY DEPARTMENT: AN OVERVIEW OF THE PROCESS ---------------------- 21 A. THE DOD CONTEXT ------------------------------ 23 1. The Planning ...Process in Summary ----------- 74 a. Program Planning (August-January) ------------ 74 b. Programming (January-April) ---------------- 77 c. Final POM...Input--------------------------------126 7. Department of the Navy Consolidated Planning and Programming Guidance -------------- 130 8. Defense Guidance

  11. VOC-PLAN: Individual Vocational Education Plan (A Quick, Efficient and Creative Way to Generate Vocational I.E.P.s), Users Manual and Preview Manual.

    ERIC Educational Resources Information Center

    Robinson, Jim; Seabolt, Pete

    This User's Manual is intended to accompany VOC-PLAN, a computer (Apple) program designed to assist in the preparation of an Individualized Vocational Education Program (IVEP) for handicapped, disadvantaged, or regular vocational secondary and postsecondary students. The program is presented in standard IEP (Individualized Education Program)…

  12. Evaluation of the ADOT small area transportation studies and planning assistance for rural areas programs.

    DOT National Transportation Integrated Search

    2014-03-01

    The Planning Assistance for Rural Areas (PARA) program, sponsored by the Arizona Department of Transportations : (ADOT) Multimodal Planning Division (MPD), dedicates funding and staff to conduct multimodal transportation planning : studies for loc...

  13. UPWP Unified Planning Work Program

    DOT National Transportation Integrated Search

    1995-05-01

    The Unified Plannrng Work Program (UPWP) iS the planning document that guides the MPO staff in fulfilling its planning responstbilities for the upcoming year. Comprised of tasks that can be changed as the planning needs change. It is intended to serv...

  14. Momentum: "Developing Masterful Marketing Plans."

    ERIC Educational Resources Information Center

    Meservey, Lynne D.

    1988-01-01

    Describes how directors can plan and develop a written marketing plan which can increase enrollment at child care centers. Components of successful marketing plans include parent retention; program merchandising; staff and director training; sales promotions; networking; and enrichment programs/fundraising. (NH)

  15. Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan

    NASA Technical Reports Server (NTRS)

    Smith, Janice F. (Compiler); Forrest, Larry

    1993-01-01

    A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.

  16. NASA Year 2000 (Y2K) Program Plan

    NASA Technical Reports Server (NTRS)

    1998-01-01

    NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.

  17. 78 FR 25760 - Proposed Information Collection; Urban Park and Recreation Recovery Program Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ...--renovate or redesign existing close-to- home recreation facilities. Innovation--specific activities that... existing programs. Planning--development of a Recovery Action Program plan. The information collection... recreation system goals. Citizen involvement in the development of the Action Plan is required and may...

  18. 38 CFR 49.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 49.25 Revision of budget and program plans. (a) The budget plan is the financial expression of...

  19. A Capital Assets Preservation Program.

    ERIC Educational Resources Information Center

    Heiman, Ralph

    1989-01-01

    New York State officials have created an efficient capital planning system that is a prescribed set of procedures and actions within a program planning manual and two software modules. The program is a series of logical steps that school districts must take to successfully implement their preservation plans. (MLF)

  20. An Aid for Planning Programs in Career Education.

    ERIC Educational Resources Information Center

    Illinois State Board of Vocational Education and Rehabilitation, Springfield. Div. of Vocational and Technical Education.

    Offered as an aid for developing sequential occupational education programs, the publication presents a concept in career education planning beginning with kindergarten and continuing through adult years. Career education goals are defined, and steps in planning sequential programs are outlined as follows: (1) organization of the occupational…

  1. 49 CFR 266.3 - Rail Service Assistance Program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... construction assistance; (6) Planning assistance; and (7) Program operations assistance. (b) Special limitations on planning assistance and program operation assistance. (1) A State is eligible to receive up to $100,000, or 5 percent of its entitlement, whichever is greater, as planning assistance; and (2) A...

  2. Indonesia's family planning program works toward self-sufficiency.

    PubMed

    Kunii, C

    1989-07-01

    Started in 1970, the Indonesian Family Planning Program is doing very well. It is coordinated by the National Family Planning Coordinating Board (BKKBN). Many new acceptors are being enrolled daily. Its aim is to reduce to 1971 fertility rate of 50% in 1990. Strategy factors are listed. The following paper, "BKKBN and the Expanding Role of Private Sector Family Planning Services and Commercial Contraceptive Sales in Indonesia," by Dr. Haryono Suyono is introduced. Another article, "A breakthrough in Family Planning Promotional Strategy," by Mr. Sumarsono is also introduced. This article deals with the marketing aspect of Indonesia's family planning program.

  3. Payment policy and the growth of Medicare Advantage.

    PubMed

    Zarabozo, Carlos; Harrison, Scott

    2009-01-01

    This paper reviews recent trends in Medicare Advantage, examining program costs, access to plans, enrollment, plan bids, and benchmarks. We find that current policy has favored the growth of particular types of plans. Bid data show that plans are paid, on average, 113 percent of what expenditures would have been under the traditional Medicare program. Although some of the plan payments are used to finance extra benefits for enrollees, paying plans at higher than fee-for-service levels could affect the sustainability of the Medicare program and result in increased costs for all taxpayers and beneficiaries.

  4. Compare and Contrast Program Planning Models

    ERIC Educational Resources Information Center

    Baskas, Richard S.

    2011-01-01

    This paper will examine the differences and similarities between two program planning models, Tyler and Caffarella, to reveal their strengths and weaknesses. When adults are involved in training sessions, there are various program planning models that can be used, depending on the goal of the training session. Researchers developed these models…

  5. 40 CFR 52.1690 - Small business technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) New York § 52.1690 Small business technical and environmental compliance assistance program. On January 11, 1993, the New York State Department of Environmental Conservation submitted a plan for the... Assistance Program for incorporation in the New York state implementation plan. This plan meets the...

  6. 40 CFR 52.2732 - Small business technical and environmental compliance assistance program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) Puerto Rico § 52.2732 Small business technical and environmental compliance assistance program. On November 16, 1992, the Puerto Rico Environmental Quality Board submitted a plan for the... Assistance Program for incorporation in the Puerto Rico state implementation plan. This plan meets the...

  7. 40 CFR 52.2732 - Small business technical and environmental compliance assistance program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) Puerto Rico § 52.2732 Small business technical and environmental compliance assistance program. On November 16, 1992, the Puerto Rico Environmental Quality Board submitted a plan for the... Assistance Program for incorporation in the Puerto Rico state implementation plan. This plan meets the...

  8. 40 CFR 52.2732 - Small business technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) Puerto Rico § 52.2732 Small business technical and environmental compliance assistance program. On November 16, 1992, the Puerto Rico Environmental Quality Board submitted a plan for the... Assistance Program for incorporation in the Puerto Rico state implementation plan. This plan meets the...

  9. 78 FR 63464 - William D. Ford Federal Direct Loan Program Repayment Plan Selection Form; Extension of Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... DEPARTMENT OF EDUCATION William D. Ford Federal Direct Loan Program Repayment Plan Selection Form; Extension of Public Comment Period; Correction AGENCY: Department of Education. ACTION: Correction notice... entitled, ``William D. Ford Federal Direct Loan Program Repayment Plan Selection Form''. ED is extending...

  10. 15 CFR 14.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  11. 22 CFR 145.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Section 145.25 Foreign Relations DEPARTMENT OF STATE CIVIL RIGHTS GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 145.25 Revision of budget and program plans. (a) The budget plan is the...

  12. A Descriptive and Evaluative Analysis of Program Planning Literature, 1950-1983.

    ERIC Educational Resources Information Center

    Sork, Thomas J.; Buskey, John H.

    1986-01-01

    Literature that presents a complete program planning model was described and analyzed using explicitly defined and uniformly applied descriptive and evaluative dimensions. Several observations about the current state of the program planning literature are made, and recommendations designed to strengthen the literature are offered. (Author/CT)

  13. Pre- and Post-Planned Evaluation: Which Is Preferable?

    ERIC Educational Resources Information Center

    Strasser, Stephen; Deniston, O. Lynn

    1978-01-01

    Factors involved in pre-planned and post-planned evaluation of program effectiveness are compared: (1) reliability and cost of data; (2) internal and external validity; (3) obtrusiveness and threat; (4) goal displacement and program direction. A model to help program administrators decide which approach is more appropriate is presented. (Author/MH)

  14. FIREFAMILY: Fire planning with historic weather data.

    Treesearch

    William A. Main; Robert J. Straub; Donna M. Paananen

    1982-01-01

    This user's guide will help fire managers interpret the output from FIREFAMILY, a computer program that uses historic weather data for fire planning. The guide describes options within the program and explains various tables and graphs necessary for planning. It also provides details which computer specialists need to run the program.

  15. OCCUPATIONAL EDUCATION--PLANNING AND PROGRAMMING. VOLUME TWO.

    ERIC Educational Resources Information Center

    KOTZ, ARNOLD

    ADDITIONAL POSITION PAPERS BASED ON INFORMATION GATHERED IN THE RECONNAISSANCE SURVEYS OF PLANNING AND PROGRAMING IN OCCUPATIONAL EDUCATION, REPORTED IN VOLUME ONE (VT 005 041), ARE PRESENTED. PART IV, CONCERNED WITH PROGRAM STRUCTURE AND BUDGETING AND THEIR RELATION TO THE PLANNING PROCESS, INCLUDES THE PAPERS--(1) "CURRENT POLICIES AND…

  16. 10 CFR 600.315 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....315 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS FINANCIAL ASSISTANCE RULES... Requirements § 600.315 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the award process. It includes the sum of the Federal and...

  17. 7 CFR 225.5 - Payments to State agencies and use of Program funds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the State Program management and administration plan and any other information available to FNS. If a... Program management and administration plan. (3) Funding assurance. At the time FNS approves the State's management and administration plan, the State shall be assured of receiving State administrative funding...

  18. 7 CFR 225.5 - Payments to State agencies and use of Program funds.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the State Program management and administration plan and any other information available to FNS. If a... Program management and administration plan. (3) Funding assurance. At the time FNS approves the State's management and administration plan, the State shall be assured of receiving State administrative funding...

  19. A Comparison of Traditional Worksheet and Linear Programming Methods for Teaching Manure Application Planning.

    ERIC Educational Resources Information Center

    Schmitt, M. A.; And Others

    1994-01-01

    Compares traditional manure application planning techniques calculated to meet agronomic nutrient needs on a field-by-field basis with plans developed using computer-assisted linear programming optimization methods. Linear programming provided the most economical and environmentally sound manure application strategy. (Contains 15 references.) (MDH)

  20. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Budgets, programs, plans, and projects. 1219.50... Order Budgets, Expenses, and Assessments § 1219.50 Budgets, programs, plans, and projects. (a) The Board shall submit to the Secretary, on a fiscal period basis, annual budgets of its anticipated expenses and...

  1. Strategic Plan. Volume 2

    NASA Technical Reports Server (NTRS)

    2002-01-01

    The Mission of the NSBRI will be to lead a National effort for accomplishing the integrated, critical path, biomedical research necessary to support the long term human presence, development, and exploration of space and to enhance life on Earth by applying the resultant advances in human knowledge and technology acquired through living and working in space. To carry out this mission, the NSBRI focuses its activities on three Strategic Programs: Strategic Program 1: Countermeasure Research Strategic Program 2: Education, Training and Outreach Strategic Program 3: Cooperative Research and Development. This document contains the detailed Team Strategic Plans for the 11 research teams focused on Strategic Program 1, and the Education and Outreach Team focused on Strategic Program 2. There is overlap and integration among the Programs and Team Strategic Plans, as described in each of the Plans.

  2. 42 CFR 457.65 - Effective date and duration of State plans and plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HEALTH AND HUMAN SERVICES (CONTINUED) STATE CHILDREN'S HEALTH INSURANCE PROGRAMS (SCHIPs) ALLOTMENTS AND GRANTS TO STATES Introduction; State Plans for Child Health Insurance Programs and Outreach Strategies... 42 Public Health 4 2010-10-01 2010-10-01 false Effective date and duration of State plans and plan...

  3. 7 CFR 23.13 - Plan of Work.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Plan of Work. 23.13 Section 23.13 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK Regional Program § 23.13 Plan of Work. (a) A Regional Plan of Work for carrying out the programs authorized to be funded under...

  4. Development of an Operational Model for the Application of Planning-Programming-Budgeting Systems in Local School Districts. Program Budgeting Note 1, Introduction to Program Budgeting.

    ERIC Educational Resources Information Center

    State Univ. of New York, Buffalo. Western New York School Study Council.

    Although the public is best served by governmental agencies which have integrated the major functions of planning, managing, and budgeting, it can be asserted that the planning function is paramount. A review of the evolution of public agency administration in the U.S. reveals that until recent years the planning function has been largely…

  5. The Lincoln Parish Family Planning Program and Its Implications for Reducing Reproductive Wastage in the Rural Poor.

    ERIC Educational Resources Information Center

    Beasley, Joseph D.; And Others

    The Lincoln Parish Family Planning Program, a 1968 pilot study designed in cooperation with the Louisiana State Board of Health, is described. The major purpose of the program was to design a program of medical care for the rural poor which would provide mothers in Lincoln Parish with information and services needed to plan family size. Sections…

  6. Results from a national survey on chronic care management by health plans.

    PubMed

    Mattke, Soeren; Higgins, Aparna; Brook, Robert

    2015-05-01

    The growing burden of chronic disease necessitates innovative approaches to help patients and to ensure the sustainability of our healthcare system. Health plans have introduced chronic care management models, but systematic data on the type and prevalence of different approaches are lacking. Our goal was to conduct a systematic examination of chronic care management programs offered by health plans in the commercial market (ie, in products sold to employers and individuals. We undertook a national survey of a representative sample of health plans (70 plans, 36% response rate) and 6 case studies on health plans' programs to improve chronic care in the commercial market. The data underwent descriptive and bivariate analyses. All plans, regardless of size, location, and ownership, offer chronic care management programs, which identify eligible members from claims data and match them to interventions based on overall risk and specific care gaps. Plans then report information on care gaps to providers and offer self-management support to their members. While internal evaluations suggest that the interventions improve care and reduce cost, plans report difficulties in engaging members and providers. To overcome those obstacles, plans are integrating their programs into provider work flow, collaborating with providers on care redesign and leveraging patient support technologies. Our study shows that chronic care management programs have become a standard component of the overall approach used by health plans to manage the health of their members.

  7. Strategic Planning for Collegiate Athletics.

    ERIC Educational Resources Information Center

    Yow, Deborah A.; Migliore, R. Henry; Bowden, William W.; Stevens, Robert E.; Loudon, David L.

    This book presents strategies for planning and managing athletic programs. It helps college athletic administrators analyze their organization's environment, set objectives, decide on specific actions, and obtain feedback. Chapter 1, "Perspectives on Planning for Athletics Programs," discusses what planning is and why it is important.…

  8. 25 CFR 170.402 - What is the tribal role in transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... transportation related meetings; (9) Performing transportation planning for operational and maintenance...

  9. 25 CFR 170.401 - What is BIA's role in transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... maintenance facilities; and (p) Researching rights-of-way documents for project planning. ...

  10. Techniques for overcoming community resistance to family planning programs.

    PubMed

    Palley, H A

    1968-01-01

    Methods of overcoming resistance to publicly subsidized family planning programs are discussed. The main sources of opposition include groups that oppose family planning for moral reasons, and those who object to the spending of government funds to provide services and information. Such opposition can be weakened by indicating that family planning clinics fulf: 11 important medical needs. Presenting social justification for family planning can help to lower oppostion. In order to secure participation in the programs by low income groups it is essential to have community leaders involved in policy decisions and to use indigenous community paraprofessionals in the clinics. A coalition of representatives of the poor community and the health and welfare system, aided by the community organization, can lead to an effective family planning program.

  11. Focus on training at CAFS.

    PubMed

    Azorbo, S; Muna, C

    1993-01-01

    The training and technical assistance programs of the Center for African Family Studies (CAFS), which is part of the International Planned Parenthood Federation for the African Region, were described. Programs included service delivery, management development, family life education, family planning communication, and research monitoring and evaluation. Several courses were offered: a week-long contraceptive technology update course for trainers and supervisors of family planning programs. Management training needs were filled through a 6-week middle level management course, a 2-week senior level management course, a 4-week community based family planning program course, a 6-week financial management of family planning and reproductive health programs course, and a 5-week course in leadership skills for management of women and health programs. Family life education courses were offered under the CAFS Women and Health Program for teachers, curriculum developers, youth leaders, and those working with young people for 3 weeks. Course issues of discussion included population and development, the family in contemporary African life, and policy legislation and laws to promote young people's health and social psychological and ethical aspects of adolescent sexuality. Family planning communication training programs were directed to strengthening IEC knowledge and skills over a 4-week period for senior and middle level personnel. The 3-week press course aimed to train journalists in print and electronic media for French-speaking countries who could gain cover population and family planning issues. The family planning research and evaluation course over 4 weeks aimed to increase the knowledge and skills of health personnel in project design, implementation, monitoring, and evaluation, in order to conduct assessment of program effectiveness. The course was directed to senior and middle level manager researchers, population project directors, and personnel of women-centered projects.

  12. [Thinking about several problems of the research of our family planning strategy].

    PubMed

    Shi, H

    1989-03-01

    On the basis of 1982 census data, it is estimated that from 1987-1997 13 million women will enter the age of marriage and child-bearing each year. The tasks of keeping the population size around 1.2 billion by the year 2000 is arduous. Great efforts have to be made to continue encouraging one child/couple, and to pursue the current plans and policies and maintain strict control over fertility. Keeping population growth in pace with economic growth, environment, ecological balance, availability of per capita resources, education programs, employment capability, health services, maternal and child care, social welfare and social security should be a component of the long term development strategy of the country. Family planning is a comprehensive program which involves long cycles and complicated factors, viewpoints of expediency in guiding policy and program formulation for short term benefits are inappropriate. The emphasis of family planning program strategy should be placed on the rural areas where the majority of population reside. Specifically, the major aspects of strategic thrusts should be the linkage between policy implementation and reception, between family planning publicity and changes of ideation on fertility; the integrated urban and rural program management relating to migration and differentiation of policy towards minority population and areas in different economic development stages. In order to achieve the above strategies, several measures are proposed. (1) strengthening family planning program and organization structure; (2) providing information on population and contraception; (3) establishing family planning program network for infiltration effects; (4) using government financing, taxation, loan, social welfare and penalty to regulate fertility motivations; (5) improving the system of target allocation and data reporting to facilitate program implementation; (6) strengthening population projection and policy research; (7) and strengthening training of family planning personnel to improve program efficiency.

  13. Ames Research Center FY 2000 Implementation Plan: Leading Technology into the New Millennium

    NASA Technical Reports Server (NTRS)

    2000-01-01

    This document presents the implementation plan for Ames Research Center (ARC) within the overall framework of the NASA Strategic Plan. It describes how ARC intends to implement its Center of Excellence responsibilities, Agency assigned missions, Agency and Enterprise lead programs, and other roles in support of NASA's vision and mission. All Federal agencies are required by the 1993 Government Performance and Results Act to implement a long-term strategic planning process that includes measurable outcomes and strict accountability. At NASA, this planning process is shaped by the Space Act of 1958, annual appropriations, and other external mandates, as well as by customer requirements. The resulting Strategic Plan sets the overall architecture for what we do, identifies who our customers are, and directs where we are going and why. The Strategic Plan is the basis upon which decisions regarding program implementation and resource deployment are made. Whereas the strategic planning process examines the long-term direction of the organization and identifies a specific set of goals, the implementation planning process examines the detailed performance of the organization and allocates resources toward meeting these goals. It is the purpose of this implementation document to provide the connection between the NASA Strategic Plan and the specific programs and support functions that ARC employees perform. This connection flows from the NASA Strategic Plan, through the various Strategic Enterprise plans to the ARC Center of Excellence, primary missions, Lead Center programs, program support responsibilities, and ultimately, to the role of the individual ARC employee.

  14. The need for coherence between waterfowl harvest and habitat management

    USGS Publications Warehouse

    Runge, M.C.; Johnson, F.A.; Anderson, M.G.; Koneff, M.D.; Reed, E.T.; Mott, S.E.

    2006-01-01

    Two of the most significant management efforts affecting waterfowl populations in North America are the North American Waterfowl Management Plan (the Plan) and Federal harvest management programs. Both the Plan and harvest management are continental in scope, involve an extensive group of stakeholders, and rely on adaptive processes of biological planning, implementation, and evaluation. The development of these programs has occurred independently, however, and there has been little explicit recognition that both harvest and habitat effects should be considered for coherent management planning and evaluation. For example, the harvest strategy can affect whether population objectives of the Plan are met, irrespective of the success of the Plan's habitat conservation efforts. Conversely, habitat conservation activities under the Plan can influence harvest potential and, therefore, the amount of hunting opportunity provided. It seems increasingly clear that the Plan's waterfowl population objectives can only be useful for conservation planning and evaluation if they are accompanied by an explicit specification of the harvest strategy and environmental conditions under which they are to be achieved. This clarification also is necessary to ensure that Plan population objectives are not attained solely through the reduction of hunting opportunity. We believe then that it is imperative that these key waterfowl-management programs work to harmonize their objectives. Harvest management programs and the Plan ought to be working toward the same ends, but that is not possible so long as the mutually reinforcing relationship of these programs is obscured by ambiguities in their management objectives.

  15. Strategic planning: the first step in the planning process.

    PubMed

    Gelinas, Marc A

    2003-01-01

    Strategic planning is a systematic process through which an organization builds commitment among key stakeholders to goals and priorities which are essential to its mission and vision, and responsive to the operating environment. Strategic planning is the first step in a comprehensive planning process that also includes business planning and implementation planning. If all three steps are carried out in sequence, strategic planning can be a very effective means of educating the stakeholders about where the cancer program is and where it is going, gaining support and commitment for the direction that the cancer program will take, and assuring that everyone's expectations can be managed effectively. Unfortunately, some organizations and cancer program leaders misunderstand the process. Too often, strategic planning is used as a stand-alone activity. This article will describe what strategic planning is, how it should smoothly lead into business planning and implementation planning, and how to avoid the pitfalls that sometimes arise during the strategic planning effort.

  16. The components of action planning and their associations with behavior and health outcomes.

    PubMed

    Lorig, Kate; Laurent, Diana D; Plant, Kathryn; Krishnan, Eswar; Ritter, Philip L

    2014-03-01

    Based on the works of Kiesler and Bandura, action plans have become important tools in patient self-management programs. One such program, shown effective in randomized trials, is the Internet Chronic Disease Self-Management Program. An implementation of this program, Healthy Living Canada, included detailed information on action plans and health-related outcome measures. Action plans were coded by type, and associations between action plans, confidence in completion and completion were examined. Numbers of Action Plans attempted and competed and completion rates were calculated for participants and compared to six-month changes in outcomes using regression models. Five of seven outcome measures significantly improved at six-months. A total of 1136 action plans were posted by 254 participants in 12 workshops (mean 3.9 out of 5 possible); 59% of action plans involved exercise, 16% food, and 14% role management. Confidence of completion was associated with completion. Action plan completion measures were associated with improvements in activity limitation, aerobic exercise, and self-efficacy. Baseline self-efficacy was associated with at least partial completion of action plans. Action planning appears to be an important component of self-management interventions, with successful completion associated with improved health and self-efficacy outcomes.

  17. Guidance system operations plan for manned CM earth orbital missions using program SKYLARK 1. Section 4: Operational modes

    NASA Technical Reports Server (NTRS)

    Dunbar, J. C.

    1972-01-01

    The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.

  18. International Photovoltaic Program Plan. Volume II. Appendices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Costello, D.; Koontz, R.; Posner, D.

    1979-12-01

    This second volume of a two-part report on the International Photovoltaic Program Plan contains appendices summarizing the results of analyses conducted in preparation of the plan. These analyses include compilations of relevant statutes and existing Federal programs; strategies designed to expand the use of photovoltaics abroad; information on the domestic photovoltaic plan and its impact on the proposed international plan; perspectives on foreign competition; industry views on the international photovoltaic market and ideas about how US government actions could affect this market; international financing issues; and information on issues affecting foreign policy and developing countries.

  19. 40 CFR 52.1119 - Identification of plan-conditional approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Implementation Plan Revision for a Small Business Technical and Environmental Compliance Assistance Program dated... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Identification of plan-conditional... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Massachusetts § 52.1119...

  20. 40 CFR 52.1519 - Identification of plan-conditional approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Implementation Plan Revision for a Small Business Technical and Environmental compliance Assistance Program dated... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Identification of plan-conditional... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1519...

  1. Developing guidelines for incorporating managing demand into WSDOT planning and programming: transportation demand management guidance for corridor planning studies.

    DOT National Transportation Integrated Search

    2016-02-01

    The Washington State Department of Transportation (WSDOT) regional planning programs address current and forecasted deficiencies of State highways through the conduct of corridor studies. This Guidance for the conduct of corridor planning studies is ...

  2. 45 CFR 1386.36 - Final disapproval of the State plan or plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON DEVELOPMENTAL DISABILITIES, DEVELOPMENTAL DISABILITIES PROGRAM FORMULA GRANT PROGRAMS Federal Assistance to State Developmental Disabilities Councils § 1386.36 Final disapproval of the State plan or plan...

  3. Federal Employees Health Benefits Program: Enrollment Options Following the Termination of a Plan or Plan Option. Final rule.

    PubMed

    2015-10-28

    The U.S. Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) Program regulations regarding enrollment options following the termination of a plan or plan option.

  4. 44 CFR 9.15 - Planning programs affecting land use.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Planning programs affecting..., DEPARTMENT OF HOMELAND SECURITY GENERAL FLOODPLAIN MANAGEMENT AND PROTECTION OF WETLANDS § 9.15 Planning... flood hazards and floodplain management and wetlands protection; and (b) Prescribes planning procedures...

  5. Some factors affecting acceptance of family planning in Manus.

    PubMed

    Avue, B; Freeman, P

    1991-12-01

    This paper examines selected factors affecting the acceptance and delivery of modern family planning from health centres in Manus. A survey was carried out of mothers attending Maternal and Child Health clinics and a written questionnaire was given to health workers. The survey of mothers demonstrated the importance of the husband's approval for contraceptive practice and showed that knowledge about traditional methods of family planning is widespread. The health workers' questionnaire demonstrated a high level of dissatisfaction with the current family planning program delivered by health clinics: 45% found the program ineffective; 68% wrote that health workers' attitudes discouraged mothers from attending for family planning. The perceived and actual benefits and costs of children and the role of men should be assessed locally before planning future family planning programs. Widespread retraining and motivating of health workers is essential if improved coverage is to be achieved through health services. The efficacy of alternative methods of delivery of family planning such as local community-based and social marketing programs should also be investigated.

  6. The crucial role of the private sector.

    PubMed

    Barberis, M; Paxman, J M

    1986-12-01

    Private support for the development of family planning programs continues to grow and now includes industries that provide family planning services, commercial outlets that distribute contraceptives, community groups that help to build demand, private medical practitioners who include contraception as a part of health care, organizations that provide technical and financial assistance to developing country programs, pharmaceutical firms, and foundations that underwrite contraceptive research. Although the mix of private and public programs differs from country to country, these 2 family planning programs complement each other and often work in close partnership. The private sector has the advantages of being able to pioneer innovative programs the public sector is unwilling or unable to pursue, to bring foreign financial and technical assistance to developing countries without political implications, and to achieve financially self-sustaining family planning efforts that are linked to other development efforts. In many countries, the private sector has been instrumental in developing a national family planning program and in eliminating barriers to family planning in countries with restrictive laws and policies. The private sector has been especially important in pioneering grassroots programs that improve the status of women through education, health care, training, and economic opportunity.

  7. 40 CFR 93.101 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded or Approved Under Title 23.... Transportation improvement program (TIP) means a transportation improvement program developed by a metropolitan... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) DETERMINING...

  8. The Galaxy Plan in Industrial Education. [Materials] Developed in The Experienced Teacher Fellowship Program.

    ERIC Educational Resources Information Center

    McClea, Kenneth R., Ed.; And Others

    These materials inform school administrators of the rationale of the Detroit Galaxy Plan and provide procedures for implementing the Plan. This program of occupational education for secondary Grades 7 through 12 is planned for students who intend to enter college, apprenticeships, or employment after high school. The Plan, developed by 24…

  9. 7 CFR 23.6 - Plan of Work.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Plan of Work. 23.6 Section 23.6 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State Program § 23.6 Plan of Work. (a) A State Annual Plan of Work for carrying out the programs authorized under title V shall be...

  10. 7 CFR 23.6 - Plan of Work.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Plan of Work. 23.6 Section 23.6 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State Program § 23.6 Plan of Work. (a) A State Annual Plan of Work for carrying out the programs authorized under title V shall be...

  11. 6. Monitoring and the Northwest Forest Plan

    Treesearch

    Leslie M. Reid

    1994-01-01

    Abstract - Monitoring will ensure that the Northwest Forest Plan is implemented as intended, determine whether the plan is achieving its intended objectives, and provide information needed to improve the plan. The credibility of the Forest Plan rests on the credibility of its monitoring program. If the monitoring program is to succeed, it must focus on well-defined...

  12. 76 FR 17159 - Office of New Reactors; Final Interim Staff Guidance on Standard Review Plan, Section 17.4...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-28

    ... Interim Staff Guidance on Standard Review Plan, Section 17.4, ``Reliability Assurance Program'' AGENCY... design reliability assurance program (RAP). This ISG updates the guidance provided to the staff in Standard Review Plan (SRP), Section 17.4, ``Reliability Assurance Program,'' of NUREG-0800, ``Standard...

  13. Successful Family Planning Programs. Draper World Population Fund Report, No. 4, Summer 1977.

    ERIC Educational Resources Information Center

    Piotrow, Phyllis T., Ed.

    This publication describes successful family planning programs throughout the world. Discussed in detail are programs in Colombia, Mauritius, Maharashtra, the People's Republic of China, Sri Lanka, and the United States. Photographs illustrate the articles and, in some cases, family planning vital statistics are given. The Draper World Population…

  14. Planning Effective Educational Programs for Adult Learners

    ERIC Educational Resources Information Center

    Shi, Hong

    2017-01-01

    Educational program planning is a complex ongoing process and planners should reflect on and consider for all of the involved factors, context, and people. The purpose of this study is to analyze how to plan effective educational programs for adult learners. Adult education is a developmental process and interacts with broad social events. Adult…

  15. The Arthropod-Borne Animal Diseases Research Laboratory: Research Program: Update and Current Status

    USDA-ARS?s Scientific Manuscript database

    The ABADRL has three 5-year project plans under two ARS National Research Programs. One project plan under the Animal Health National Program is entitled “Countermeasures to control and eradicate Rift Valley fever (RVF)”. Research objectives in this plan are 1) to determine the vector competence of ...

  16. 25 CFR 170.403 - What IRR Program funds can be used for transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What IRR Program funds can be used for transportation planning? 170.403 Section 170.403 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads...

  17. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Updated program plans and budgets. 603.885 Section 603.885... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision... effort and a revised budget if there is a significant change from the initial budget. ...

  18. Planning and Equipping School Lunchrooms. Bulletin, 1946, No. 19

    ERIC Educational Resources Information Center

    US Office of Education, Federal Security Agency, 1946

    1946-01-01

    In many schools, plans are underway to expand facilities to include necessary space and equipment for providing adequate school lunch programs. This bulletin furnishes basic materials on which school people may plan space and equipment for new school lunch programs or appraise existing programs to determine what improvements in arrangement or…

  19. A Peer-Based Financial Planning & Education Service Program: An Innovative Pedagogic Approach

    ERIC Educational Resources Information Center

    Goetz, Joseph W.; Durband, Dorothy B.; Halley, Ryan E.; Davis, Kimberlee

    2011-01-01

    This paper presents a peer-based financial planning and education program as a strategy to address the lack of financial literacy among college students and provide an experiential learning opportunity for students majoring in financial planning or other financial services-related disciplines. Benefits of such programs to campus communities are…

  20. LDRD FY 2014 Program Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anita Gianotto; Dena Tomchak

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  1. Understanding Program Planning Theory and Practice in a Feminist Community-Based Organization

    ERIC Educational Resources Information Center

    Bracken, Susan J.

    2011-01-01

    The purpose of this article is to discuss feminist-program-planning issues, drawing from a critical ethnographic study of a Latin American feminist community-based organization. The research findings discuss the centrality of feminist identity to understanding and analyzing day-to-day program-planning process issues within a feminist…

  2. Laboratory Directed Research and Development Program FY2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none, none

    2012-04-27

    Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2011 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). Going forward in FY 2012, the LDRD program also supports themore » Goals codified in the new DOE Strategic Plan of May, 2011. The LDRD program also supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the Office of Science Program Offices, such as LDRD projects germane to new research facility concepts and new fundamental science directions. Brief summares of projects and accomplishments for the period for each division are included.« less

  3. 7 CFR 1207.311 - Programs and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.311 Programs and projects. Programs and...

  4. 7 CFR 1207.311 - Programs and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.311 Programs and projects. Programs and...

  5. 7 CFR 1207.311 - Programs and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.311 Programs and projects. Programs and...

  6. 7 CFR 1207.311 - Programs and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.311 Programs and projects. Programs and...

  7. Integrated environmental planning in the Philippines: A case study of the Palawan Integrated Environmental Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ganapin, D.J. Jr.

    1987-01-01

    Integrated environmental planning was analyzed using the case of the Palawan Integrated Environmental Program in the Philippines. The study explores the relationship between development and environmental planning and evaluates the importance of organizational coordination and timing in the integration of these two concerns. Factors affecting the accomplishment of the objectives of integrated environmental planning were also studied. Two planning phases of the Palawan Integrated Environmental Program were observed using the case study approach. Observations of various planning participants-consultants, middle level agency personnel, heads of local agencies-were also considered. The integration of environmental considerations in development planning was found to bemore » beneficial to both environmental and development concerns. The experience showed that such integration requiring tight organizational coordination and the proper timing of activities and outputs. The success of the Palawan Integrated Environmental Program was also found to depend on effective communication, the political functionality of the government, the leadership of its executives, the presence of appropriate structures of authority, sufficiency of funds and manpower and the availability of appropriate environmental planning techniques. Recommendations are provided to further strengthen the integration of environmental considerations in development planning and increase the effectiveness of integrated environmental programs.« less

  8. The requirements and feasibility of business planning in the office of space and terrestrial applications

    NASA Technical Reports Server (NTRS)

    Greenberg, J. S.; Miller, B. P.

    1979-01-01

    The feasibility of applying strategic business planning techniques which are developed and used in the private sector to the planning of certain projects within the NASA Office of Space and Terrestrial Applications was assessed. The methods of strategic business planning that are currently in use in the private sector are examined. The typical contents of a private sector strategic business plan and the techniques commonly used to develop the contents of the plan are described, along with modifications needed to apply these concepts to public sector projects. The current long-range planning process in the Office of Space and Terrestrial Applications is reviewed and program initiatives that might be candidates for the use of strategic business planning techniques are identified. In order to more fully illustrate the information requirements of a strategic business plan for a NASA program, a sample business plan is prepared for a hypothetical Operational Earth Resources Satellite program.

  9. Revised research plan for the U.S. Climate Change Science Program

    DOT National Transportation Integrated Search

    2008-05-01

    The U.S. Climate Change Science Program (CCSP) released its Strategic Plan in 2003.This Revised Research Plan, in compliance with Section 104(a) of the Global Change Research Act of 1990, is an update to the 2003 Strategic Plan. It reflects both scie...

  10. 77 FR 64422 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ... Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC Adjusted Standard AGENCY...) 408-2279. 4. Mail: Doug Aburano, Chief, Attainment Planning and Maintenance Section, Air Programs.... 5. Hand Delivery: Doug Aburano, Chief, Attainment Planning and Maintenance Section, Air Programs...

  11. Formulating New Directions with Strategic Marketing Planning.

    ERIC Educational Resources Information Center

    Crompton, John L.

    1983-01-01

    This article describes both a short- and long-term strategic marketing planning approach for the parks and recreation manager. Both plans involve a needs assessment, objective development, marketing plans, and evaluations. Also discussed is a continuum of stragetic program options ranging from developing new programs to terminating existing…

  12. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  13. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  14. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  15. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  16. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  17. Using Program Data to Improve Access to Family Planning and Enhance the Method Mix in Conflict-Affected Areas of the Democratic Republic of the Congo

    PubMed Central

    Ho, Lara S; Wheeler, Erin

    2018-01-01

    Unmet need for family planning in the conflict-affected area of eastern Democratic Republic of the Congo (DRC) has been reported to be as high as 38%, and women in such conflict settings are often the most at risk for maternal mortality. The International Rescue Committee implements the Family Planning and Post-Abortion Care in Emergencies program in 3 provinces of eastern DRC to provide women and couples access to family planning, including long-acting reversible contraceptives (LARCs). This article presents routine program data from June 2011 through December 2013 from 2 health zones as well as results from a qualitative assessment of family planning clients and of male and female non-users, conducted in 2013. It then describes how these findings were used to make program adjustments to improve access to family planning services and client informed choice and assesses the effects of the program design changes on family planning uptake and method mix using routine program data from January 2014 through December 2016. Between 2011 and 2013, 8,985 clients adopted family planning, with an average 14 clients adopting a method per facility, per month. The method mix remained stable during this period, with implants dominating at 48%. Barriers to uptake identified from the qualitative research were both supply- and demand-related, including misconceptions about certain modern contraceptive methods on the part of providers, users, and other community members. The program implemented several program changes based on the assessment findings, including clinical coaching and supportive supervision to improve provider skills and attitudes, introduction of immediate postpartum insertion of the intrauterine device (IUD) and the levonorgestrel-releasing intrauterine system (LNG-IUS), and behavior change communication campaigns to raise awareness about family planning. After these program changes, the mean number of clients adopting modern family planning per facility, per month increased from 14 to 37 and the percentage of family planning adopters choosing LARCs increased from 50% to 66%. While implants continued to be the most dominant method, reaching 60% of the method mix in 2016, the percentage of clients adopting IUDs increased each year, from 3% in 2014 to 13% in 2016. In total, 39,399 clients started family planning methods during the post-program design change period (2014–2016). Our experience in eastern DRC demonstrates that women and their partners affected by conflict want family planning, and that it is feasible to deliver the full range of modern contraceptive methods when programs are adapted and sensitive to the local context. PMID:29602870

  18. [How to expand and improve the coverage of family planning services: a Latin American viewpoint].

    PubMed

    Trias, M

    1992-12-01

    It is probably not possible to implant a family planning program that will have a reasonable demographic impact in areas lacking awareness of the disadvantages of overly high fertility. Rural-urban migration, increasing educational levels, women's labor force participation, and declining infant mortality are all factors that have been found to correlate with demand for family planning services. It has been recognized since the Bucharest World Population Conference in 1974 that development and family planning are both required for the fertility transition to begin. Where these conditions exist, a family planning program appropriate to the needs, limitations, preferences, and expectations of the target population has an excellent chance of success. Expanded and improved coverage results from tailoring programs to the specific groups served. Most programs are directed toward women. It has been found most effective to provide services for men in separate sessions. It is also useful to distinguish between services for adolescents, who require more information and fewer services, for mature women who require more services than information, and for premenopausal women whose needs for information and services are both declining. Contraceptive preferences vary with social class, but family planning programs in developing countries should concentrate on the lower middle and lower classes which comprise 80% of the population. Rural areas and marginal urban areas require special attention. In order to provide services that will attract all potential users, the maximum possible variety of methods should be available. A family planning program offering a variety of methods throughout the country and financially accessible to the population should be successful. Family planning programs, whether public or private, require adequate financial resources and the support or at least tolerance of the government. Knowledge of contraception is now almost universal. A major challenge of family planning programs is to prompt women who say they want to limit their reproduction but who do not practice family planning to adopt a method. Program leadership and interpersonal relations with clients should be competent. The experience of PROFAMILIA in Colombia suggests that charging fees for all services offered by the family planning program is a positive feature allowing the client to avoid feeling like a charity recipient and the program to account for materials and services more easily. Goals and objective indicators stimulate performance and allow progress to be assessed. It is recommended that client education focus on a synthesis of information concerning available methods and provision of somewhat greater detail on the method chosen. Integration of services is usually an enemy of family planning because, despite theoretical advantages, it usually means neglect of family planning in favor of curative care.

  19. The Office of Space Science and Applications strategic plan, 1990: A strategy for leadership in space through excellence in space science and applications

    NASA Technical Reports Server (NTRS)

    1990-01-01

    A strategic plan for the U.S. space science and applications program during the next 5 to 10 years was developed and published in 1988. Based on the strategies developed by the advisory committees of both the National Academy of Science and NASA, the plan balances major, moderate, and small mission initiatives, the utilization of the Space Station Freedom, and the requirements for a vital research base. The Office of Space Science and Applications (OSSA) strategic plan is constructed around five actions: establish a set of programmatic themes; establish a set of decision rules; establish a set of priorities for missions and programs within each theme; demonstrate that the strategy will yield a viable program; and check the strategy for consistency within resource constraints. The OSSA plan is revised annually. This OSSA 1990 Strategic Plan refines the 1989 Plan and represents OSSA's initial plan for fulfilling its responsibilities in two major national initiatives. The Plan is now built on interrelated, complementary strategies for the core space science and applications program, for the U.S. Global Change Research Program, and for the Space Exploration Initiative. The challenge is to make sure that the current level of activity is sustained through the end of this century and into the next. The 1990 Plan presents OSSA's strategy to do this.

  20. Fact Sheet: Risk Management Plan (RMP) Audit Program

    EPA Pesticide Factsheets

    Risk management programs, which consist of a hazard assessment, a prevention program, and an emergency response program; must be periodically audited to assess whether the plans are adequate or need to be revised to comply with the regulation.

  1. DO FAMILY PLANNING PROGRAMS DECREASE POVERTY? EVIDENCE FROM PUBLIC CENSUS DATA

    PubMed Central

    Bailey, Martha J.; Malkova, Olga; Norling, Johannes

    2014-01-01

    This paper provides new evidence that family planning programs are associated with a decrease in the share of children and adults living in poverty. Our research design exploits the county roll-out of U.S. family planning programs in the late 1960s and early 1970s and examines their relationship with poverty rates in the short and longer-term in public census data. We find that cohorts born after federal family planning programs began were less likely to live in poverty in childhood and that these same cohorts were less likely to live in poverty as adults. PMID:25346655

  2. Future Orbital Power Systems Technology Requirements

    NASA Technical Reports Server (NTRS)

    1978-01-01

    NASA is actively involved in program planning for missions requiring several orders of magnitude, more energy than in the past. Therefore, a two-day symposium was held to review the technology requirements for future orbital power systems. The purpose of the meeting was to give leaders from government and industry a broad view of current government supported technology efforts and future program plans in space power. It provided a forum for discussion, through workshops, to comment on current and planned programs and to identify opportunities for technology investment. Several papers are presented to review the technology status and the planned programs.

  3. Rural-Urban Differences in Awareness and Use of Family Planning Services Among Adolescent Women in California.

    PubMed

    Yarger, Jennifer; Decker, Martha J; Campa, Mary I; Brindis, Claire D

    2017-04-01

    The purpose of this study was to compare awareness and use of family planning services by rural and urban program site among a sample of adolescent women before participation in the federal Personal Responsibility Education Program in California. We conducted a secondary analysis of survey data collected from youth before participation in California's Personal Responsibility Education Program. Bivariate and multivariate analyses were conducted for a sample of 4,614 females ages 14-18 years to compare awareness and use of family planning services between participants at rural and urban program sites, controlling for the program setting and participant demographic, sexual, and reproductive characteristics. Overall, 61% of participants had heard of a family planning provider in their community, and 24% had visited a family planning provider. Awareness and use of family planning services were lower among rural participants than urban participants. After adjusting for the program setting and participant characteristics, rural participants were less likely to know about a family planning provider in their community (odds ratio, .64; 95% confidence interval, .50-.81) or receive family planning services (odds ratio, .76; 95% confidence interval, .58-.99) than urban participants. Findings suggest that adolescents in rural areas face greater barriers to accessing family planning services than adolescents in urban areas. Targeted efforts to increase awareness and use of family planning services among adolescents in rural areas and among other underserved populations are needed. Copyright © 2016 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  4. Generating AN Optimum Treatment Plan for External Beam Radiation Therapy.

    NASA Astrophysics Data System (ADS)

    Kabus, Irwin

    1990-01-01

    The application of linear programming to the generation of an optimum external beam radiation treatment plan is investigated. MPSX, an IBM linear programming software package was used. All data originated from the CAT scan of an actual patient who was treated for a pancreatic malignant tumor before this study began. An examination of several alternatives for representing the cross section of the patient showed that it was sufficient to use a set of strategically placed points in the vital organs and tumor and a grid of points spaced about one half inch apart for the healthy tissue. Optimum treatment plans were generated from objective functions representing various treatment philosophies. The optimum plans were based on allowing for 216 external radiation beams which accounted for wedges of any size. A beam reduction scheme then reduced the number of beams in the optimum plan to a number of beams small enough for implementation. Regardless of the objective function, the linear programming treatment plan preserved about 95% of the patient's right kidney vs. 59% for the plan the hospital actually administered to the patient. The clinician, on the case, found most of the linear programming treatment plans to be superior to the hospital plan. An investigation was made, using parametric linear programming, concerning any possible benefits derived from generating treatment plans based on objective functions made up of convex combinations of two objective functions, however, this proved to have only limited value. This study also found, through dual variable analysis, that there was no benefit gained from relaxing some of the constraints on the healthy regions of the anatomy. This conclusion was supported by the clinician. Finally several schemes were found that, under certain conditions, can further reduce the number of beams in the final linear programming treatment plan.

  5. PLANNING, PROGRAMMING, DESIGNING THE COMMUNITY COLLEGE, PROCEEDINGS OF A CONFERENCE SPONSORED BY THE COLLEGE OF ARCHITECTURE AND URBAN PLANNING AND THE CENTER FOR THE DEVELOPMENT OF COMMUNITY COLLEGE EDUCATION (UNIVERSITY OF WASHINGTON, APRIL 24-25, 1967).

    ERIC Educational Resources Information Center

    SONDALLE, MARVIN P.

    PARTICIPANTS AT THIS CONFERENCE DEFINED THE ESSENTIAL MAJOR STEPS IN FACILITY PLANNING FOR A NEW CAMPUS AS SITE SELECTION, FINANCIAL PROGRAMMING, CAMPUS PLANNING, AND CONSTRUCTION. THEY ALSO AGREED THAT THE COLLEGE ADMINISTRATION AND THE ARCHITECTURAL STAFF MUST WORK TOGETHER AT EVERY STAGE OF THE PROGRAM. PRESENT TECHNIQUES OF ENROLLMENT…

  6. 7 CFR 23.13 - Plan of Work.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... multi-State organizations or bodies for those activities of the Regional Rural Development Centers which... of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK Regional Program § 23.13 Plan of Work. (a) A Regional Plan of Work for carrying out the programs authorized to be funded under...

  7. 45 CFR 1321.17 - Content of State plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON AGING, OLDER AMERICANS PROGRAMS GRANTS TO STATE AND COMMUNITY PROGRAMS ON AGING State Agency Responsibilities § 1321.17 Content of State plan. To... each planning and service area and of area agencies on aging designated for each planning and service...

  8. 45 CFR 1321.17 - Content of State plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON AGING, OLDER AMERICANS PROGRAMS GRANTS TO STATE AND COMMUNITY PROGRAMS ON AGING State Agency Responsibilities § 1321.17 Content of State plan. To... each planning and service area and of area agencies on aging designated for each planning and service...

  9. 45 CFR 1321.17 - Content of State plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON AGING, OLDER AMERICANS PROGRAMS GRANTS TO STATE AND COMMUNITY PROGRAMS ON AGING State Agency Responsibilities § 1321.17 Content of State plan. To... each planning and service area and of area agencies on aging designated for each planning and service...

  10. Andrews University Master Plan for Campus Expansion and the Development Program, 1977-1985.

    ERIC Educational Resources Information Center

    Smoot, Joseph G.

    Described in detail in this partly promotional, partly informational publication are the history of campus planning, new master plan, and new capital programs of this Seventh Day Adventist institution. Numerous maps, photographs, and tables of financial and statistical data illustrate the plan. (MSE)

  11. National Data Program for the Marine Environment Technical Development Plan. Final Report, Volume Two.

    ERIC Educational Resources Information Center

    System Development Corp., Santa Monica, CA.

    A national data program for the marine environment is recommended. Volume 2 includes: (1) objectives, scope, and methodology; (2) summary of the technical development plan; (3) agency development plans - Great Lakes and coastal development and (4) marine data network development plans. (Author)

  12. 40 CFR 68.180 - Emergency response program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...

  13. 40 CFR 68.180 - Emergency response program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...

  14. 40 CFR 68.180 - Emergency response program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...

  15. 40 CFR 68.180 - Emergency response program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...

  16. The Missouri Career Development and Teacher Excellence Plan: An Initial Study of Missouri's Career Ladder Program. A Technical Report.

    ERIC Educational Resources Information Center

    Schofer, Richard C.; And Others

    The Missouri Plan provides for direct participation of teachers in the planning, development, and implementation of the district career ladder plan. This study analyzed the appropriateness of the Missouri teacher incentive plan. In particular, the study sought to determine why districts did or did not choose to implement career ladder programs;…

  17. Strategic plan for bioenergy research, 1998--2003, the Canadian Forest Service five-year plan: Implementing the Canadian bioenergy research strategy (in English;French)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-10-01

    This document supersedes the previous one, taking into account changes that have taken place in the CFS Science and Technology (S and T) program structure and organization, and in the structure of the Program of Energy Research and Development, the source of funding for CFS bioenergy research. It explains the rationale and overall objective for the bioenergy research program and briefly reviews the accomplishments to date. It indicates the planning context within which the program operates, states the specific objectives for the period of the plan, and details the strategic priorities developed for this period. Finally, it outlines the implementationmore » process for the plan.« less

  18. 34 CFR 611.2 - What management plan must be included in a Teacher Quality Enhancement Grants Program application?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TEACHER QUALITY ENHANCEMENT GRANTS PROGRAM General Provisions § 611.2 What management plan must be... 34 Education 3 2010-07-01 2010-07-01 false What management plan must be included in a Teacher Quality Enhancement Grants Program application? 611.2 Section 611.2 Education Regulations of the Offices...

  19. An Education and Development Program for Michigan's State Health Planning Advisory Council.

    ERIC Educational Resources Information Center

    Michigan State Office of Health and Medical Affairs, Lansing.

    The report describes a Federally supported education and development program conducted during the 1973-74 fiscal year for members of the Michigan State Health Planning Advisory Council. The program sought to increase: (1) the council members' awareness of and insight into the comprehensive health planning process, (2) their knowledge of the health…

  20. 25 CFR 170.404 - What happens when a tribe uses its IRR Program construction funds for transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What happens when a tribe uses its IRR Program construction funds for transportation planning? 170.404 Section 170.404 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction...

  1. Planning Student Flow with Linear Programming: A Tunisian Case Study.

    ERIC Educational Resources Information Center

    Bezeau, Lawrence

    A student flow model in linear programming format, designed to plan the movement of students into secondary and university programs in Tunisia, is described. The purpose of the plan is to determine a sufficient number of graduating students that would flow back into the system as teachers or move into the labor market to meet fixed manpower…

  2. Forest and farmland conservation effects of Oregon's (USA) land-use planning program.

    Treesearch

    Jeffrey D. Kline

    2005-01-01

    Oregon's land-use planning program is often cited as an exemplary approach to forest and farmland conservation, but analyses of its effectiveness are limited. This article examines Oregon's land-use planning program using detailed spatial data describing building densities in western Oregon. An empirical model describes changes in building densities on forest...

  3. Study of solid rocket motor for space shuttle booster, Volume 3: Program acquisition planning

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The program planning acquisition functions for the development of the solid propellant rocket engine for the space shuttle booster is presented. The subjects discussed are: (1) program management, (2) contracts administration, (3) systems engineering, (4) configuration management, and (5) maintenance engineering. The plans for manufacturing, testing, and operations support are included.

  4. 32 CFR 37.885 - May I require updated program plans?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false May I require updated program plans? 37.885 Section 37.885 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND... Financial and Programmatic Reporting § 37.885 May I require updated program plans? In addition to reports on...

  5. 32 CFR 37.885 - May I require updated program plans?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false May I require updated program plans? 37.885 Section 37.885 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND... Financial and Programmatic Reporting § 37.885 May I require updated program plans? In addition to reports on...

  6. 32 CFR 37.885 - May I require updated program plans?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false May I require updated program plans? 37.885 Section 37.885 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND... Financial and Programmatic Reporting § 37.885 May I require updated program plans? In addition to reports on...

  7. 32 CFR 37.885 - May I require updated program plans?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 1 2012-07-01 2012-07-01 false May I require updated program plans? 37.885 Section 37.885 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND... Financial and Programmatic Reporting § 37.885 May I require updated program plans? In addition to reports on...

  8. 32 CFR 37.885 - May I require updated program plans?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 1 2014-07-01 2014-07-01 false May I require updated program plans? 37.885 Section 37.885 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND... Financial and Programmatic Reporting § 37.885 May I require updated program plans? In addition to reports on...

  9. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  10. 28 CFR 524.23 - Program reviews.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Program reviews. 524.23 Section 524.23... TRANSFER CLASSIFICATION OF INMATES Youth Corrections Act (YCA) Programs § 524.23 Program reviews. Staff shall conduct periodic reviews of the inmate's program plan and shall modify the plan in accordance with...

  11. 75 FR 43510 - Office of Innovation and Improvement; Overview Information; Charter Schools Program (CSP) Grants...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... Schools Program (CSP) Grants to Non-State Educational Agencies for Planning, Program Design, and..., program design, and implementation, and non-SEA grants for dissemination provide funds for these purposes.... Non-SEA eligible applicants that propose to use grant funds for planning, program design, and...

  12. Social Policy Planning Programs and Prospects.

    ERIC Educational Resources Information Center

    Todd, Frederick W.

    This study, a monitor of four experimental training programs in the field of social policy planning, has as its purpose to assess program development and outcomes and to relate any significant findings useful in educational program development for social policy professionals. The programs are discussed at two levels: individually in terms of their…

  13. Agricultural Extension--Programming the Work.

    ERIC Educational Resources Information Center

    Smith, G. A.

    This paper outlines the concept of "program" and one set of elements that are considered to make up the program planning process in agricultural extension, and an example of practical program planning in Rhodesia is given. Although there is a wide variety of meanings attached to the term "program" in adult education, it has…

  14. 7 CFR 1207.311 - Programs and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.311 Programs and projects. Programs and projects mean those research, development, advertising or promotion programs or projects developed by the...

  15. Steps to a HealthierUS Cooperative Agreement Program: foundational elements for program evaluation planning, implementation, and use of findings.

    PubMed

    MacDonald, Goldie; Garcia, Danyael; Zaza, Stephanie; Schooley, Michael; Compton, Don; Bryant, Terry; Bagnol, Lulu; Edgerly, Cathy; Haverkate, Rick

    2006-01-01

    The Steps to a HealthierUS Cooperative Agreement Program (Steps Program) enables funded communities to implement chronic disease prevention and health promotion efforts to reduce the burden of diabetes, obesity, asthma, and related risk factors. At both the national and community levels, investment in surveillance and program evaluation is substantial. Public health practitioners engaged in program evaluation planning often identify desired outcomes, related indicators, and data collection methods but may pay only limited attention to an overarching vision for program evaluation among participating sites. We developed a set of foundational elements to provide a vision of program evaluation that informs the technical decisions made throughout the evaluation process. Given the diversity of activities across the Steps Program and the need for coordination between national- and community-level evaluation efforts, our recommendations to guide program evaluation practice are explicit yet leave room for site-specific context and needs. Staff across the Steps Program must consider these foundational elements to prepare a formal plan for program evaluation. Attention to each element moves the Steps Program closer to well-designed and complementary plans for program evaluation at the national, state, and community levels.

  16. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision requiring the recipient to annually prepare an updated technical plan for future conduct of the research...

  17. Developing an interdisciplinary certificate program in transportation planning.

    DOT National Transportation Integrated Search

    2010-09-01

    This project develops and implements a graduate certificate in transportation planning. Texas A&M : University (A&M) currently offers instruction in transportation through its Master of Urban Planning (MUP) : and Civil Engineering (CE) programs; howe...

  18. Generalizable Skills in Individualized Vocational Program Planning for Special Needs Students.

    ERIC Educational Resources Information Center

    Stodden, Robert A.; Boone, Rosalie

    1986-01-01

    The authors address planning issues and suggest methods of interagency cooperation, integration of generalizable skills in individualized educational planning/programming, developing goals and objectives, and using student assessment and evaluation information. (CT)

  19. Problem identification for Virginia's highway safety plan.

    DOT National Transportation Integrated Search

    1982-01-01

    Problem identification is recognized as an important component of highway safety planning. Under the NHTSA/FHWA concept, problem identification is the first step in program planning and in the development of effective countermeasure programs. The ann...

  20. 75 FR 65385 - Advisory Committee for Polar Programs; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ... Antarctic Program review; Strategic Planning; planning for a Polar Research Vessel. Dated: October 19, 2010... research community, to provide advice to the Director of OPP on issues related to long-range planning...

  1. How to Convince Parents to Stop Spanking Their Children.

    PubMed

    Hudnut-Beumler, Julia; Smith, Ashley; Scholer, Seth J

    2018-02-01

    English- and Spanish-speaking parents of 1- to 5-year-old children were invited to view 5-10 minutes of parent training program, "Play Nicely," as part of the well-child checkup. Key measures were parents' plans to change how they discipline and, if they planned to use less spanking, how the program worked in their situation. Of 197 parents who participated, 128 (65.0%) planned to change how they discipline. Nineteen parents (9.6%) reported that they planned to spank less. The most common reasons for parents to plan to spank less were that the program taught other discipline options (12/19, 63.2%) and that the program taught that spanking was not recommended as a form of discipline (6/19, 31.6%). The majority of parents report that the program works because it offers alternatives to spanking. This study has implications for the development of parent training programs and the primary prevention of child abuse, violence, and other health problems.

  2. Characterizing the Breadth and Depth of Volunteer Water Monitoring Programs in the United States.

    PubMed

    Stepenuck, Kristine F; Genskow, Kenneth D

    2018-01-01

    A survey of 345 volunteer water monitoring programs in the United States was conducted to document their characteristics, and perceived level of support for data to inform natural resource management or policy decisions. The response rate of 86% provided information from 46 states. Programs represented a range of ages, budgets, objectives, scopes, and level of quality assurance, which influenced data uses and perceived support by sponsoring agency administrators and external decision makers. Most programs focused on rivers, streams, and lakes. Programs had not made substantial progress to develop EPA or state-approved quality assurance plans since 1998, with only 48% reporting such plans. Program coordinators reported feeling slightly more support for data to be used for management as compared to policy decisions. Programs with smaller budgets may be at particular risk of being perceived to lack credibility due to failure to develop quality assurance plans. Over half of programs identified as collaborative, in that volunteers assisted scientists in program design, data analysis and/or dissemination of results. Just under a third were contributory, in which volunteers primarily collected data in a scientist-defined program. Recommendations to improve perceived data credibility, and to augment limited budgets include developing quality assurance plans and gaining agency approval, and developing partnerships with other organizations conducting monitoring in the area to share resources and knowledge. Funding agencies should support development of quality assurance plans to help ensure data credibility. Service providers can aid in plan development by providing training to program staff over time to address high staff turnover rates.

  3. Characterizing the Breadth and Depth of Volunteer Water Monitoring Programs in the United States

    NASA Astrophysics Data System (ADS)

    Stepenuck, Kristine F.; Genskow, Kenneth D.

    2018-01-01

    A survey of 345 volunteer water monitoring programs in the United States was conducted to document their characteristics, and perceived level of support for data to inform natural resource management or policy decisions. The response rate of 86% provided information from 46 states. Programs represented a range of ages, budgets, objectives, scopes, and level of quality assurance, which influenced data uses and perceived support by sponsoring agency administrators and external decision makers. Most programs focused on rivers, streams, and lakes. Programs had not made substantial progress to develop EPA or state-approved quality assurance plans since 1998, with only 48% reporting such plans. Program coordinators reported feeling slightly more support for data to be used for management as compared to policy decisions. Programs with smaller budgets may be at particular risk of being perceived to lack credibility due to failure to develop quality assurance plans. Over half of programs identified as collaborative, in that volunteers assisted scientists in program design, data analysis and/or dissemination of results. Just under a third were contributory, in which volunteers primarily collected data in a scientist-defined program. Recommendations to improve perceived data credibility, and to augment limited budgets include developing quality assurance plans and gaining agency approval, and developing partnerships with other organizations conducting monitoring in the area to share resources and knowledge. Funding agencies should support development of quality assurance plans to help ensure data credibility. Service providers can aid in plan development by providing training to program staff over time to address high staff turnover rates.

  4. The Situation Analysis Study of the family planning program in Kenya.

    PubMed

    Miller, R A; Ndhlovu, L; Gachara, M M; Fisher, A A

    1991-01-01

    A new, relatively "quick and clean" operations research approach called a "situation analysis" was developed for examining the strengths and weaknesses of the family planning program of Kenya. Field research teams visited a stratified random sample of 99 of the Ministry of Health's approximately 775 service delivery points. Observation techniques and interviewing were used to collect information on program components and on the quality of care provided to new family planning clients during the observation day. As late as 1986, the Kenya program was rated "weak" and "poor" in the international literature. The Kenya Situation Analysis Study found a functioning, integrated maternal and child health/family planning program serving large numbers of clients, with an emphasis on oral contraceptives and Depo-Provera (and an underemphasis on permanent methods). Although a number of program problems were revealed by the study, overall, in terms of performance, a rating of "moderate" is suggested as more appropriate for Kenya's national family planning program today. In terms of the quality of care, a "moderate to moderate-high" rating is suggested.

  5. Endocrine Disruptor Screening Program (EDSP) Comprehensive Management Plans

    EPA Pesticide Factsheets

    The EDSP Comprehensive Management Plan describes the technical review processes that will be used in implementing this program and how the agency intends to factor technology advancements into the program.

  6. 20 CFR 631.40 - State program operational plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false State program operational plan. 631.40 Section 631.40 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROGRAMS... Federal-State Unemployment Compensation System, the Trade Adjustment Assistance Program, the State...

  7. 45 CFR 1304.51 - Management systems and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... program planning that includes consultation with the program's governing body, policy groups, and program... SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD...-income families with young children. Program planning must include: (i) An assessment of community...

  8. Selenide isotope generator for the Galileo mission. Reliability program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-10-01

    The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineatedmore » herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work.« less

  9. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or moremore » BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.« less

  10. Estimating family planning program effects on U.S. fertility rates.

    PubMed

    Cutright, P; Jaffe, F S

    1977-08-01

    An evaluation was undertaken of the effects on U. S. fertility rates of the national family planning program. 1968-1969 family planning enrollment data were linked to 1970 census data in the same areas to derive an objective measure of the impact of organized clinical family planning programs on the 1969-70 fertility rates of subgroups of women defined by age, race, marital status, economic status, and racial composition of their area. Multivariate modelling was used to control for spurious effects of irrelevant variables. Results of the multivariate modelling show significant reductions of marital fertility among the low socioeconomic groups served by the program; no effects were exhibited by groups not served. Cumulative fertility of all groups, black and white, at all age and socioeconomic levels was affected by the program. A plausible explanation for these results lies in antecedent factors which led to the presence or absence of family planning clinics in any particular area in 1969 and its 1969 enrollment level. Communities more favorably disposed to provision of birth control services would have been more likely than other areas to apply for federal funding of family planning programs when it became available in the middle 1960s. Due to an earlier start, their programs were flourishing by 1969.

  11. Administrative and Technical Support for the U.S. Army Medical Research and Development Command Joint Working Group on Medical Chemical Defense

    DTIC Science & Technology

    1989-08-01

    microproces;qor databaAing systems for monitoring project and contract reports and program technology trans. fers, coordinating and providing administratIvo ...The JWGD 3 annual planning process generally included: - Program review by the JWGD’ membership at quarterly meetings, which consisted of the review...Office developed the program planning and budget documents associated with the planning process outlined above. Program project databases and

  12. Integrating the Department of Defense Military Services’ Technology Development Programs to Improve Time, Cost, and Technical Quality Parameters

    DTIC Science & Technology

    2007-03-01

    the DoD in general and across the SR, DD(X), and FCS programs in particular. The findings of this study show that through careful planning and...FCS programs in particular. The findings of this study show that through careful planning and coordinated technology transition, DoD acquisition...careful planning and coordinated technology transition, DoD acquisition programs can indeed leverage the technology development efforts of the three

  13. Program definition and assessment overview. [for thermal energy storage project management

    NASA Technical Reports Server (NTRS)

    Gordon, L. H.

    1980-01-01

    The implementation of a program level assessment of thermal energy storage technology thrusts for the near and far term to assure overall coherent energy storage program is considered. The identification and definition of potential thermal energy storage applications, definition of technology requirements, and appropriate market sectors are discussed along with the necessary coordination, planning, and preparation associated with program reviews, workshops, multi-year plans and annual operating plans for the major laboratory tasks.

  14. Unified planning work program federal fiscal year 2008

    DOT National Transportation Integrated Search

    2008-01-01

    This Unified Planning Work Program (UPWP) contains information about surface-transportation planning projects that will be conducted in the Boston metropolitan region during the period of October 1, 2007, through September 30, 2008 (federal fiscal ye...

  15. FY 95 engineering work plan for the design reconstitution implementation action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bigbee, J.D.

    Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less

  16. Population and population policy in Pakistan.

    PubMed

    Mauldin, W P

    1963-02-01

    Pakistan is a divided country with different religious groups represented. Since independence in 1941, the Muslim population has increased more rapidly than the Hindu population, the West Pakistan population more rapidly and steadily than the East Pakistan population. In the late 1950s the Pakistan government initiated a family planning program. The program has trained medical and paramedical personnel in family planning, added family planning services to existing medical centers, planned for a National Research Institute of Family Planning, employed mobile units to reach outlying areas, conducted limited clinical studies on some contraceptives, and used mass media advertising. Only India and Japan are doing more with government-sponsored family planning. A weak organizational structure and an inadequate number of trained personnel are the main weakness of the program. It is too early to assess the success of the program. A 10-point reduction in annual birth rates will be considered successful.

  17. 78 FR 48679 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... (GPRA) and HHS, to guide financial and program planning and evaluation, and to respond to inquiries... identifier HHS-OS-19606-30D for reference. Information Collection Request Title: Family Planning Annual...) administers and oversees the Title X Family Planning Program. The Family Planning Annual Report (FPAR) is an...

  18. 78 FR 29370 - Agency Information Collection Activities; Proposed Collection; Public Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ... HHS, to guide financial and program planning and evaluation, and to respond to inquiries about the... identifier HHS-OS-19606-60D for reference. Information Collection Request Title: Family Planning Annual...) administers and oversees the Title X Family Planning Program. The Family Planning Annual Report (FPAR) is an...

  19. Succession Planning: A Doctoral Program Partnership for Emerging Community College Leaders

    ERIC Educational Resources Information Center

    Luna, Gaye

    2010-01-01

    This article describes a doctoral program partnership between a university and a community college district that addresses the need of employment-planning strategies for building leadership capacity in the community college system. Succession planning information is provided as a foundational framework to plan for the next generation of community…

  20. 42 CFR 422.455 - Special rules for MA Regional Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Special rules for MA Regional Plans. 422.455... SERVICES (CONTINUED) MEDICARE PROGRAM MEDICARE ADVANTAGE PROGRAM Special Rules for MA Regional Plans § 422.455 Special rules for MA Regional Plans. (a) Coverage of entire MA region. The service area for an MA...

  1. 42 CFR 422.455 - Special rules for MA Regional Plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 3 2012-10-01 2012-10-01 false Special rules for MA Regional Plans. 422.455... SERVICES (CONTINUED) MEDICARE PROGRAM (CONTINUED) MEDICARE ADVANTAGE PROGRAM Special Rules for MA Regional Plans § 422.455 Special rules for MA Regional Plans. (a) Coverage of entire MA region. The service area...

  2. 42 CFR 422.455 - Special rules for MA Regional Plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 3 2011-10-01 2011-10-01 false Special rules for MA Regional Plans. 422.455... SERVICES (CONTINUED) MEDICARE PROGRAM MEDICARE ADVANTAGE PROGRAM Special Rules for MA Regional Plans § 422.455 Special rules for MA Regional Plans. (a) Coverage of entire MA region. The service area for an MA...

  3. 42 CFR 422.455 - Special rules for MA Regional Plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 3 2014-10-01 2014-10-01 false Special rules for MA Regional Plans. 422.455... SERVICES (CONTINUED) MEDICARE PROGRAM (CONTINUED) MEDICARE ADVANTAGE PROGRAM Special Rules for MA Regional Plans § 422.455 Special rules for MA Regional Plans. (a) Coverage of entire MA region. The service area...

  4. 42 CFR 422.455 - Special rules for MA Regional Plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 3 2013-10-01 2013-10-01 false Special rules for MA Regional Plans. 422.455... SERVICES (CONTINUED) MEDICARE PROGRAM (CONTINUED) MEDICARE ADVANTAGE PROGRAM Special Rules for MA Regional Plans § 422.455 Special rules for MA Regional Plans. (a) Coverage of entire MA region. The service area...

  5. Planning Communities: Citizens in Two Border Towns Learn To Plan Their Own Initiatives.

    ERIC Educational Resources Information Center

    Henkel, David

    1998-01-01

    The University of New Mexico's Community and Regional Planning Program worked with two border towns that share water resources--Columbus (New Mexico) and Puerto Palomas (Chihuahua, Mexico)--to help them prepare a community comprehensive plan needed for water-project funding. The program conducted action research involving local schools and people…

  6. Planned Change in Teacher Education: Unfreezing the Status Quo through the Integration of Technology.

    ERIC Educational Resources Information Center

    Bell, Edwin D.; Ireh, Madu

    This study examined planned change in Winston-Salem State University's teacher education program. An external review of the School of Education indicated a weakness in program planning and curriculum design. This review stimulated planned change initiative to strengthen teacher education. Factors influencing the internal environment of teacher…

  7. 41 CFR 101-26.506 - Interior planning and design services.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Interior planning and...

  8. 23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...

  9. 23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...

  10. 23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...

  11. 23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...

  12. 23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...

  13. 50 CFR 86.133 - What are the plan standards?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 9 2012-10-01 2012-10-01 false What are the plan standards? 86.133 Section 86.133 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR...) PROGRAM How States Will Complete the State Program Plans § 86.133 What are the plan standards? You must...

  14. 50 CFR 86.133 - What are the plan standards?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 9 2014-10-01 2014-10-01 false What are the plan standards? 86.133 Section 86.133 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR... (BIG) PROGRAM How States Will Complete the State Program Plans § 86.133 What are the plan standards...

  15. NASA Strategic Plan

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The aforementioned strategic decisions and the overarching direction for America's aeronautics and space program are addressed in the Strategic Plan. Our Strategic Plan is critical to our ability to meet the challenges of this new era and deliver a vibrant aeronautics and space program that strengthens and inspires the Nation. The Plan is our top-level strategy.

  16. The MAP program: building the digital terrain model.

    Treesearch

    R.H. Twito; R.W. Mifflin; R.J. McGaughey

    1987-01-01

    PLANS, a software package for integrated timber-harvest planning, uses digital terrain models to provide the topographic data needed to fit harvest and transportation designs to specific terrain. MAP, an integral program in the PLANS package, is used to construct the digital terrain models required by PLANS. MAP establishes digital terrain models using digitizer-traced...

  17. RBS Career Education. Evaluation Planning Manual. Education Is Going to Work.

    ERIC Educational Resources Information Center

    Kershner, Keith M.

    Designed for use with the Research for Better Schools career education program, this evaluation planning manual focuses on procedures and issues central to planning the evaluation of an educational program. Following a statement on the need for evaluation, nine sequential steps for evaluation planning are discussed. The first two steps, program…

  18. 7 CFR 1209.40 - Programs, plans, and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... requirements for quality control, grade standards, supply management programs, or other programs that would..., plan, or project, no reference to a brand name, trade name, or State or regional identification of any...

  19. QA program plan plutonium stabilization and handling project W-460

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHULTZ, J.W.

    This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460.

  20. A System for the Exchange of Information on Instructional Materials: An Evaluation for Planned Change in Australian Education.

    ERIC Educational Resources Information Center

    Watt, Michael G.

    This evaluation project presents a plan for a program to establish a clearinghouse for exchanging qualitative and quantitative data on instructional materials used in Australian schools. A range of elements necessary to plan a program suited to Australian requirements and conditions was investigated. Focus was on: the program's mission,…

  1. Intelligent transportation systems Professional Capacity Building Program : planning and deploying ITS : six white papers describing current and planned programs of five transportation associations and four university ITS Research Centers of Excellence

    DOT National Transportation Integrated Search

    1997-12-01

    In the fall of 1997, the ITS Professional Capacity Building Program initiated the development of six White Papers to briefly describe the current status of, and plans for future education and training activities of six organizations engaged in ...

  2. National Program Plan for Research and Development in Solar Heating and Cooling. Interim Report.

    ERIC Educational Resources Information Center

    Energy Research and Development Administration, Washington, DC. Div. of Solar Energy.

    This report presents the Energy Research and Development Administration (ERDA) program plan for solar heating and cooling of buildings and for agricultural and industrial process applications. An overview of the program plan is followed by a description of the ten paths to the solar heating and cooling of buildings and a brief discussion of the…

  3. Customizing for clients: developing a library liaison program from need to plan.

    PubMed

    Tennant, M R; Butson, L C; Rezeau, M E; Tucker, P J; Boyle, M E; Clayton, G

    2001-01-01

    Building on the experiences of librarian representatives to curriculum committees in the colleges of dentistry, medicine, and nursing, the Health Science Center Libraries (HSCL) Strategic Plan recommended the formation of a Library Liaison Work Group to create a formal Library Liaison Program to serve the six Health Science Center (HSC) colleges and several affiliated centers and institutes. The work group's charge was to define the purpose and scope of the program, identify models of best practice, and recommend activities for liaisons. The work group gathered background information, performed an environmental scan, and developed a philosophy statement, a program of liaison activities focusing on seven primary areas, and a forum for liaison communication. Hallmarks of the plan included intensive subject specialization (beyond collection development), extensive communication with users, and personal information services. Specialization was expected to promote competence, communication, confidence, comfort, and customization. Development of the program required close coordination with other strategic plan implementation teams, including teams for collection development, education, and marketing. This paper discusses the HSCL's planning process and the resulting Library Liaison Program. Although focusing on an academic health center, the planning process and liaison model may be applied to any library serving diverse, subject-specific user populations.

  4. Customizing for clients: developing a library liaison program from need to plan*

    PubMed Central

    Tennant, Michele R.; Butson, Linda C.; Rezeau, Michelle E.; Tucker, Prudence J.; Boyle, Marian E.; Clayton, Greg

    2001-01-01

    Building on the experiences of librarian representatives to curriculum committees in the colleges of dentistry, medicine, and nursing, the Health Science Center Libraries (HSCL) Strategic Plan recommended the formation of a Library Liaison Work Group to create a formal Library Liaison Program to serve the six Health Science Center (HSC) colleges and several affiliated centers and institutes. The work group's charge was to define the purpose and scope of the program, identify models of best practice, and recommend activities for liaisons. The work group gathered background information, performed an environmental scan, and developed a philosophy statement, a program of liaison activities focusing on seven |primary areas, and a forum for liaison communication. Hallmarks of the plan included intensive subject specialization (beyond collection development), extensive communication with users, and personal information services. Specialization was expected to promote competence, communication, confidence, comfort, and customization. Development of the program required close coordination with other strategic plan implementation teams, including teams for collection development, education, and marketing. This paper discusses the HSCL's planning process and the resulting Library Liaison Program. Although focusing on an academic health center, the planning process and liaison model may be applied to any library serving diverse, subject-specific user populations. PMID:11209807

  5. Project Planning and Reporting

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Project Planning Analysis and Reporting System (PPARS) is automated aid in monitoring and scheduling of activities within project. PPARS system consists of PPARS Batch Program, five preprocessor programs, and two post-processor programs. PPARS Batch program is full CPM (Critical Path Method) scheduling program with resource capabilities. Can process networks with up to 10,000 activities.

  6. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Fivemore » priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs.« less

  7. A Technology Plan for Enabling Commercial Space Business

    NASA Technical Reports Server (NTRS)

    Lyles, Garry M.

    1997-01-01

    The National Aeronautics and Space Administration's (NASA) Advanced Space Transportation Program is a customer driven, focused technology program that supports the NASA Strategic Plan and considers future commercial space business projections. The initial cycle of the Advanced Space Transportation Program implementation planning was conducted from December 1995 through February 1996 and represented increased NASA emphasis on broad base technology development with the goal of dramatic reductions in the cost of space transportation. The second planning cycle, conducted in January and February 1997, updated the program implementation plan based on changes in the external environment, increased maturity of advanced concept studies, and current technology assessments. The program has taken a business-like approach to technology development with a balanced portfolio of near, medium, and long-term strategic targets. Strategic targets are influenced by Earth science, space science, and exploration objectives as well as commercial space markets. Commercial space markets include those that would be enhanced by lower cost transportation as well as potential markets resulting in major increases in space business induced by reductions in transportation cost. The program plan addresses earth-to-orbit space launch, earth orbit operations and deep space systems. It also addresses all critical transportation system elements; including structures, thermal protection systems, propulsion, avionics, and operations. As these technologies are matured, integrated technology flight experiments such as the X-33 and X-34 flight demonstrator programs support near-term (one to five years) development or operational decisions. The Advanced Space Transportation Program and the flight demonstrator programs combine business planning, ground-based technology demonstrations and flight demonstrations that will permit industry and NASA to commit to revolutionary new space transportation systems beginning at the turn of the century and continuing far into the future.

  8. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI&SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI&SI field task must include (1) the general health and safety program plan for all WAG 2 RI&SI field activities and (2) a WP/HSC for that particular field task.more » These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169.« less

  9. Outdoor Education Manual.

    ERIC Educational Resources Information Center

    Gooyers, Cobina; And Others

    Designed for teachers to provide students with an awareness of the world of nature which surrounds them, the manual presents the philosophy of outdoor education, goals and objectives of the school program, planning for outdoor education, the Wildwood Programs, sequential program planning for students, program booking and resource list. Content…

  10. 7 CFR 1210.331 - Programs and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., effectuation and administration of appropriate programs or projects for advertising and other sales promotion...; (d) A prohibition on advertising or other promotion programs that make any reference to private brand... PROMOTION PLAN Watermelon Research and Promotion Plan Research and Promotion § 1210.331 Programs and...

  11. 77 FR 66087 - Federal Perkins Loan Program, Federal Family Education Loan Program, and William D. Ford Federal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-01

    ...The Secretary amends the Federal Perkins Loan (Perkins Loan) program, Federal Family Education Loan (FFEL) program, and William D. Ford Federal Direct Loan (Direct Loan) program regulations. These final regulations implement a new Income-Contingent Repayment (ICR) plan in the Direct Loan program based on the President's ``Pay As You Earn'' repayment initiative, incorporate recent statutory changes to the Income-Based Repayment (IBR) plan in the Direct Loan and FFEL programs, and streamline and add clarity to the total and permanent disability (TPD) discharge process for borrowers in loan programs under title IV of the Higher Education Act of 1965, as amended (HEA). These final regulations implementing a new ICR plan and the statutory changes to the IBR plan will assist borrowers in repaying their loans while the changes to the TPD discharge process will reduce burden for borrowers who are disabled and seeking a discharge of their title IV debt.

  12. 77 FR 60116 - Notice of Proposed Information Collection Requests; State Plan for Vocational Rehabilitation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-02

    ... Rehabilitation Services Administration a State Plan for the Vocational Rehabilitation (VR) Services program and... approved VR State Plan and SE supplement form the basis upon which a state participates in programs under...

  13. Third World Experience of Education for Planning: Africa.

    ERIC Educational Resources Information Center

    Tetteh, Austin

    1980-01-01

    Presented is an overview of the development of planning education at the undergraduate, graduate, and professional levels in Africa. Future needs include greater program flexibility and more help for developing countries to establish their own planning education programs. (WB)

  14. 41 CFR 101-26.506-1 - Types of service.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAM 26.5-GSA Procurement Programs § 101-26.506-1 Types of service. GSA interior planning and design...; softline space plans; development of an interior design program (to include finish materials, furniture and...

  15. Research and technology operating plan summary: Fiscal year 1975 research and technology program. [space programs, energy technology, and aerospace sciences

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Summaries are presented of Research and Technology Operating Plans currently in progress throughout NASA. Citations and abstracts of the operating plans are presented along with a subject index, technical monitor index, and responsible NASA organization index. Research programs presented include those carried out in the Office of Aeronautics and Space Technology, Office of Energy Programs, Office of Applications, Office of Space Sciences, Office of Tracking and Data Acquisition, and the Office of Manned Space Flight.

  16. FFTF-cycle 10 program and future plan

    NASA Astrophysics Data System (ADS)

    Kohyama, Akira

    1988-04-01

    Brief outlines are provided of the FFTF cycle 10 program and future plans in consideration. The primary objective of the Japan-US collaboration program is to enable predictions of material behavior in MFRs to be made from data obtained in other irradiation environments. Major program goals are outlined.

  17. Integrated Technology Plan for the Civil Space Program, 1991

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The purpose of the Integrated Technology Plan (ITP) is to serve as a strategic plan for the OAST space research and technology (R&T) program, and as a strategic planning framework for other NASA and national participants in advocating and conducting technology developments that support future U.S. civil space missions. The ITP begins with a discussion of the national policy and NASA organization which establishes the overall framework for civil space R&T planning. The second chapter provides a top-level review of the potential users of civil space R&T, their strategic mission plans, and the technologies they have identified as needed to achieve those plans. The overall methodology used to develop a civil space technology strategy is discussed. The technical details of the 1991 strategic plan are described, ending with a review of civil space R&T priorities. The fourth chapter describes how the strategic plan is annually translated into the OAST Space R&T Program, with a summary of the fiscal year 1992 program. The ITP concludes with a discussion of requirements for technology development coordination and strategies for facilitating the transfer of civil space technology to the private sector. Several appendices also are attached that provide further information regarding budget implications of the strategic plan, organizational roles, and other topics.

  18. FY 2011 Educational Facilities Master Plan & the FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2010

    2010-01-01

    The FY 2011 Educational Facilities Master Plan (Master Plan) and FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  19. Career Exploration Occupational Information for the Junior High/Middle School. A Planning Curriculum Guide.

    ERIC Educational Resources Information Center

    Lawson, Dorothy M.; McDonald, Dorothea V.

    Materials contained in this guide are designed to be used in planning a comprehensive career education program and for developing individual career education units for grades 6-9. Section 1 is the planning guide and contains strategies for organizing, planning, and implementing a program, developing staff inservice, conducting a needs assessment,…

  20. A Planning Model for the Development of Programs for Abused and Neglected Children in Rural Areas.

    ERIC Educational Resources Information Center

    Chamberlain, William A.

    Described are planning steps involved in developing programs for abused and neglected children in rural areas. Among barriers cited are economic factors and resistance to social planning. Emphasized is the need for congruence among local and regional agencies and organizations. Analyzed are six planning stages: entry, in which consultants gain…

  1. 10 CFR 905.1 - What are the purposes of the Energy Planning and Management Program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Resource Planning, allows customers of the Western Area Power Administration (Western) to meet the objectives of section 114 of EPAct through integrated resource planning or by other means, such as attaining... purposes of the Energy Planning and Management Program (EPAMP) are to meet the objectives of Section 114 of...

  2. National ITS Program Plan Intelligent Transportation Systems Volume I

    DOT National Transportation Integrated Search

    1995-03-01

    ADVANCED TRAVELER INFORMATION SYSTEMS OR ATIS : THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS, THE FIRST EDITION OF THE PLAN WAS A JOINT ...

  3. Interim guidance for implementing SAFETEA-LU provisions on planning, environment, and air quality for FHWA authorities

    DOT National Transportation Integrated Search

    2007-02-14

    This final rule revises the regulations governing the development of metropolitan transportation plans and programs for urbanized areas, State transportation plans and programs and the regulations for Congestion Management Systems. The revision resul...

  4. Transportation Planning and Research : ANNUAL WORK PROGRAM AND COST ESTIMATE, 2018

    DOT National Transportation Integrated Search

    2018-01-01

    This document is the section-by-section ANNUAL WORK PROGRAM AND COST ESTIMATE for the agency whose MISSION is to provide excellence in transportation planning through an inclusive and comprehensive planning process that provides products, services, a...

  5. National ITS Program Plan Executive Summary

    DOT National Transportation Integrated Search

    1995-03-01

    THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS FIRST EDITION OF THE PLAN WAS A JOINT EFFORT OF ITS AMERICA AND THE UNITED STATES DEPARTMEN...

  6. Creating a Marketing Plan.

    ERIC Educational Resources Information Center

    Sevier, Robert A.

    1989-01-01

    A guide to developing a college marketing plan defines key marketing terms, outlines the development of a plan (including institutional analysis, market research, strategy formation and execution, and program evaluation), and provides a list of important principles with which to operate a program. (MSE)

  7. Outcomes of a career planning and development program for registered nurses.

    PubMed

    Hall, Linda McGillis; Waddell, Janice; Donner, Gail; Wheeler, Mary M

    2004-01-01

    The impact of a career planning and development program (CPDP) for registered nurses (RNs) on nurse and system outcomes was examined. The CPDP was effective as participants were able to create a career vision and individualized career plan.

  8. Louisiana Airport System Plan Five-Year Capital Improvement Program.

    DOT National Transportation Integrated Search

    1992-07-01

    The Louisiana Airport System Plan (LASP) Five-Year-Capital Improvement Program (CIP) is a development plan for all commercial service, reliever, and general aviation airports in Louisiana. It is a detailed listing of potential projects based on the a...

  9. California Community College Family and Consumer Sciences Program Plan, 1996. Including: Directory of Professional and Trade Organizations, Directory of Family and Consumer Sciences and Related Program Areas and Program Coordinators.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    Intended as a resource for California community colleges and districts in assessing and improving family and consumer science (FCS) programs, this program plan provides information on current trends affecting the delivery of FCS programs and guidelines for assessing and developing new comprehensive or specialized programs. Following letters of…

  10. Continental United States Military Housing Inspection National Capital Region

    DTIC Science & Technology

    2015-08-13

    that was flaking, peeling, or chalking. JBAB did not have an asbestos management program, plan, or an appointed asbestos program manager...housing partner to ensure inspection and maintenance plan is achieved; and • Implement an asbestos management plan and appoint an asbestos program...select environmental health and safety requirements, such as those for drinking water, radon, asbestos , and lead based paint. We conducted this

  11. A Preservation Program for the Colorado State University Libraries. The Final Report of the ARL/OMS Preservation Planning Program.

    ERIC Educational Resources Information Center

    Green, Stephen; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Colorado State University Library (CSUL) working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). Designed to put self-help tools into the hands of library staff responsible for developing plans and procedures…

  12. A Supplement to the Component Four Implementation Booklet. Broad Goal Definition in Emerald School District. SPECS: School Planning, Evaluation, and Communication System.

    ERIC Educational Resources Information Center

    Nagle, John M.; Walker, Harold E.

    The School Planning, Evaluation, and Communication System (SPECS) is an overall design for districtwide program assessment and development. It is both a way of interrelating planning and evaluation of individual programs and a way of comparing the outcomes of all district programs with the district's community-defined educational goals. This…

  13. A PLAN FOR EXPANSION AND DEVELOPMENT OF EDUCATION DEPARTMENTS OF FLORIDA DIVISION OF CORRECTIONS, IN COOPERATION WITH FLORIDA STATE UNIVERSITY ADULT EDUCATION DEPARTMENT.

    ERIC Educational Resources Information Center

    ENDWRIGHT, D.K.

    THE PLAN FOR EXPANSION AND DEVELOPMENT OF EDUCATION PROGRAMS IN CORRECTIVE INSTITUTIONS IS ORGANIZED INTO FIVE TIMED PHASES TO BE COMPLETED IN THREE YEARS. A CHART REPRESENTING THE PROGRAM, AFFILIATED RESEARCH AND AGENCIES DELINEATES PLANNED ACTIVITIES. PHASE ONE (15 WEEKS) WILL SURVEY EXISTING PROGRAMS (VOCATIONAL AND ACADEMIC FACILITIES,…

  14. Monitored execution of robot plans produced by STRIPS.

    NASA Technical Reports Server (NTRS)

    Fikes, R. E.

    1972-01-01

    We describe PLANEX1, a plan executor for the Stanford Research Institute robot system. The problem-solving program STRIPS creates a plan consisting of a sequence of actions, and PLANEX1 program carries out the plan by executing the actions. PLANEX1 is designed so that it executes only that portion of the plan necessary for completing the task, reexecutes any portion of the plan that has failed to achieve the desired results, and initiates replanning in situations where the plan can no longer be effective in completing the task. The scenario for an example plan execution is given.

  15. Institutional plan. Fiscal year, 1997--2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-10-01

    The Institutional Plan is the culmination of Argonne`s annual planning cycle. The document outlines what Argonne National Laboratory (ANL) regards as the optimal development of programs and resources in the context of national research and development needs, the missions of the Department of Energy and Argonne National Laboratory, and pertinent resource constraints. It is the product of ANL`s internal planning process and extensive discussions with DOE managers. Strategic planning is important for all of Argonne`s programs, and coordination of planning for the entire institution is crucial. This Institutional Plan will increasingly reflect the planning initiatives that have recently been implemented.

  16. US-VISIT Identity Matching Algorithm Evaluation Program: ADIS Algorithm Evaluation Project Plan Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant, C W; Lenderman, J S; Gansemer, J D

    This document is an update to the 'ADIS Algorithm Evaluation Project Plan' specified in the Statement of Work for the US-VISIT Identity Matching Algorithm Evaluation Program, as deliverable II.D.1. The original plan was delivered in August 2010. This document modifies the plan to reflect modified deliverables reflecting delays in obtaining a database refresh. This document describes the revised schedule of the program deliverables. The detailed description of the processes used, the statistical analysis processes and the results of the statistical analysis will be described fully in the program deliverables. The US-VISIT Identity Matching Algorithm Evaluation Program is work performed bymore » Lawrence Livermore National Laboratory (LLNL) under IAA HSHQVT-07-X-00002 P00004 from the Department of Homeland Security (DHS).« less

  17. Evaluation readiness: improved evaluation planning using a data inventory framework.

    PubMed

    Cohen, A B; Hall, K C; Cohodes, D R

    1985-01-01

    Factors intrinsic to many programs, such as ambiguously stated objectives, inadequately defined performance measures, and incomplete or unreliable databases, often conspire to limit the evaluability of these programs. Current evaluation planning approaches are somewhat constrained in their ability to overcome these obstacles and to achieve full preparedness for evaluation. In this paper, the concept of evaluation readiness is introduced as a complement to other evaluation planning approaches, most notably that of evaluability assessment. The basic products of evaluation readiness--the formal program definition and the data inventory framework--are described, along with a guide for assuring more timely and appropriate evaluation response capability to support the decision making needs of program managers. The utility of evaluation readiness for program planning, as well as for effective management, is also discussed.

  18. Well-planning programs give students field-like experience

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sifferman, T.R.; Chapman, L.

    1983-01-01

    The University of Tulsa recently was given a package of computer well planning and drilling programs that will enable petroleum engineering students to gain valuable experience in designing well programs while still in school. Comprehensive homework assignments are now given in areas of drilling fluids programing, hydraulics, directional wells and surveying. Additional programs are scheduled for next semester.

  19. Programs for road network planning.

    Treesearch

    Ward W. Carson; Dennis P. Dykstra

    1978-01-01

    This paper describes four computer programs developed to assist logging engineers to plan transportation in a forest. The objective of these programs, to be used together, is to find the shortest path through a transportation network from a point of departure to a destination. Three of the programs use the digitizing and plotting capabilities of a programable desk-top...

  20. Establishing a program of global initiatives for nursing education.

    PubMed

    Kulage, Kristine M; Hickey, Kathleen T; Honig, Judy C; Johnson, Mary P; Larson, Elaine L

    2014-07-01

    In the global nursing community, schools of nursing are increasingly developing initiatives and networks across national boundaries. This article describes the process undertaken at a school of nursing to determine its global health priorities and develop a program of global initiatives for nursing education. A series of meetings were held to determine faculty global activities and gauge interest in designing a 5-year strategic plan for the program. A volunteer Strategic Planning Work-group was convened to formalize a mission, vision, and strategic plan for the program, which were presented to, refined by, and vetted by an advisory board and the faculty at large. We recommend this process to schools committed to developing or expanding a program dedicated to global initiatives and a global perspective in educational planning. Involving stakeholders, building on current strengths, and aligning with mission and vision are essential elements for developing a meaningful program of global initiatives for nursing education. Copyright 2014, SLACK Incorporated.

  1. Programs of Study and Support Services Guide. Workforce Development Education.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh.

    This document was developed to assist local school systems in North Carolina in planning effective and comprehensive workforce development education programs. It contains information about planning, required resources, instructional guidelines, and program area offerings. The guide is organized in three parts. Part I provides a program description…

  2. 40 CFR 130.12 - Coordination with other programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.12 Coordination with other programs. (a) Relationship... 208(e) of the Act, no NPDES permit may be issued which is in conflict with an approved Water Quality Management (WQM) plan. Where a State has assumed responsibility for the administration of the permit program...

  3. Programs for skyline planning.

    Treesearch

    Ward W. Carson

    1975-01-01

    This paper describes four computer programs for the logging engineer's use in planning log harvesting by skyline systems. One program prepares terrain profile plots from maps mounted on a digitizer; the other programs prepare load-carrying capability and other information for single and multispan standing skylines and single span running skylines. In general, the...

  4. 75 FR 19966 - Boulder Canyon Project-Post-2017 Application of the Energy Planning and Management Program Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project--Post-2017 Application of the Energy Planning and Management Program Power Marketing Initiative AGENCY: Western Area... and Management Program (Program) Power Marketing Initiative (PMI) (10 CFR part 905) to the Boulder...

  5. 76 FR 30147 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... Management Program Power Marketing Initiative to the Boulder Canyon Project AGENCY: Western Area [email protected] . Information regarding Western's Boulder Canyon Project (BCP) Post-2017 remarketing efforts, the Energy Management and Planning Program (Program), and the Conformed General Consolidated Power...

  6. Projecting Program Cost Over an Adequate Time Horizon.

    ERIC Educational Resources Information Center

    Spencer, Milton

    Planning Programming Budgeting Systems involve the introduction of three major operational concepts. First, the development of an analytical capability to examine in depth both agency objectives and the various programs to meet these objectives. Second, the formation of a five-year planning and programming process combined with a sophisticated…

  7. Business process modeling for the Virginia Department of Transportation : a demonstration with the integrated six-year improvement program and the statewide transportation improvement program.

    DOT National Transportation Integrated Search

    2005-01-01

    This effort demonstrates business process modeling to describe the integration of particular planning and programming activities of a state highway agency. The motivations to document planning and programming activities are that: (i) resources for co...

  8. SPECS 2. Component Two: Program Budgeting and Cost Accounting.

    ERIC Educational Resources Information Center

    DuVall, Lloyd A.

    The School Planning, Evaluation, and Communication System (SPECS) is an overall design for districtwide program assessment and development. It is both a way of interrelating planning and evaluation of individual programs and a way of comparing the outcomes of all district programs with the district's community-defined educational goals. Component…

  9. 44 CFR Appendix B to Part 62 - National Flood Insurance Program

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... obtain a copy of “The Write Your Own Program Financial Control Plan Requirements and Procedures” by... Plan to Maintain Financial Control for Business Written Under the Write Your Own Program. (a) In general. Under the Write Your Own (WYO) Program, we (the Federal Insurance Administration (FIA), Federal...

  10. ROUTES: a computer program for preliminary route location.

    Treesearch

    S.E. Reutebuch

    1988-01-01

    An analytical description of the ROUTES computer program is presented. ROUTES is part of the integrated preliminary harvest- and transportation-planning software package, PLANS. The ROUTES computer program is useful where grade and sideslope limitations are important in determining routes for vehicular travel. With the program, planners can rapidly identify route...

  11. Nature's Classroom: A Program Guide for Camps and Schools.

    ERIC Educational Resources Information Center

    Cassens, Jennifer R., Ed.

    This guide assists instructors in planning outdoor experiences, particularly in a camp setting. Although it is not a pre-packaged program, the book contains over 40 outdoor programming ideas, allowing instructors to create their own programs. It includes suggestions for goal setting, scheduling, housing, staffing, curriculum planning, policy…

  12. 78 FR 9651 - Approval and Promulgation of Implementation Plans; Oregon: Heat Smart Program and Enforcement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... Promulgation of Implementation Plans; Oregon: Heat Smart Program and Enforcement Procedures AGENCY... submission contains revisions to the Heat Smart program and to the enforcement procedures and civil penalties... submission contains additional revisions to the Heat Smart program, along with minor revisions and...

  13. 78 FR 37124 - Approval and Promulgation of Implementation Plans; Oregon: Heat Smart Program and Enforcement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... Promulgation of Implementation Plans; Oregon: Heat Smart Program and Enforcement Procedures AGENCY..., 2012, and November 28, 2012. The submitted revisions relate to Oregon's Heat Smart program, rules for... relate to Oregon's Heat Smart program in Oregon Administrative Rules (OAR) Chapter 340, Division 262 (OAR...

  14. Energy plan, 1981

    NASA Astrophysics Data System (ADS)

    1981-12-01

    The planning procedures for the energy program and policy guidelines for energy planning are presented. Future changes in marginal costs and directions indicated for economically efficient pricing are assessed. The aim of the conservation program is to close the gap between the amounts of conservation which is rationally cost effective and that projected to occur anyway through normal market forces. An overview of energy demand and proposed plans for energy supply are given. Liquid fuels have priority although work on coal receives new emphasis. A better program on energy demand and management is suggested.

  15. Preoperative Planning of Orthopedic Procedures using Digitalized Software Systems.

    PubMed

    Steinberg, Ely L; Segev, Eitan; Drexler, Michael; Ben-Tov, Tomer; Nimrod, Snir

    2016-06-01

    The progression from standard celluloid films to digitalized technology led to the development of new software programs to fulfill the needs of preoperative planning. We describe here preoperative digitalized programs and the variety of conditions for which those programs can be used to facilitate preparation for surgery. A PubMed search using the keywords "digitalized software programs," "preoperative planning" and "total joint arthroplasty" was performed for all studies regarding preoperative planning of orthopedic procedures that were published from 1989 to 2014 in English. Digitalized software programs are enabled to import and export all picture archiving communication system (PACS) files (i.e., X-rays, computerized tomograms, magnetic resonance images) from either the local working station or from any remote PACS. Two-dimension (2D) and 3D CT scans were found to be reliable tools with a high preoperative predicting accuracy for implants. The short learning curve, user-friendly features, accurate prediction of implant size, decreased implant stocks and low-cost maintenance makes digitalized software programs an attractive tool in preoperative planning of total joint replacement, fracture fixation, limb deformity repair and pediatric skeletal disorders.

  16. Patient Protection and Affordable Care Act; HHS Notice of Benefit and Payment Parameters for 2018; Amendments to Special Enrollment Periods and the Consumer Operated and Oriented Plan Program. Final rule.

    PubMed

    2016-12-22

    This final rule sets forth payment parameters and provisions related to the risk adjustment program; cost-sharing parameters and cost-sharing reductions; and user fees for Federally-facilitated Exchanges and State-based Exchanges on the Federal platform. It also provides additional guidance relating to standardized options; qualified health plans; consumer assistance tools; network adequacy; the Small Business Health Options Programs; stand-alone dental plans; fair health insurance premiums; guaranteed availability and guaranteed renewability; the medical loss ratio program; eligibility and enrollment; appeals; consumer-operated and oriented plans; special enrollment periods; and other related topics.

  17. The effectiveness of alternative planned durations of residential drug abuse treatment.

    PubMed Central

    McCusker, J; Vickers-Lahti, M; Stoddard, A; Hindin, R; Bigelow, C; Zorn, M; Garfield, F; Frost, R; Love, C; Lewis, B

    1995-01-01

    Randomized controlled trials were conducted at two residential drug abuse treatment facilities to compare programs that differed in planned duration. One trial compared a 6-month and a 12-month therapeutic community program (n = 184), and the second compared a 3-month and a 6-month relapse prevention program (n = 444). Retention rates over comparable time periods differed minimally by planned treatment duration, and the longer programs had lower completion rates. There was no effect in either trial of planned treatment duration on changes in psychosocial variables between admission and exit or on rates or patterns of drug use at follow-up between 2 and 6 months after exit. PMID:7573630

  18. 23 CFR 450.332 - Annual listing of obligated projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... calendar days following the end of the program year, the State, public transportation operator(s), and the... 450.332 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332 Annual...

  19. Transportation improvement program and air quality conformity determination federal fiscal years 2008-2011

    DOT National Transportation Integrated Search

    2007-01-01

    In order to be eligible for federal funds, urbanized areas are required to maintain a continuing, cooperative, and comprehensive (3C) transportation planning process that results in plans and programs consistent with the planning objectives of the me...

  20. F14A System Safety Program Plan

    DTIC Science & Technology

    1981-09-03

    by block number) Electromagnetic Pulse (EMP) Safety Plans Test Program EMP Testing F14 Aircraft Plans 20 ABSTRACT (Continue on reverse side if...compromising completion of the required experimental tasks. This document addresses the safety aspect of performing an Electromagnetic Pulse (EMP) test

  1. Planning and environment linkages program : a guide to measuring progress in linking transportation planning and environmental analysis

    DOT National Transportation Integrated Search

    2009-12-01

    Transportation agencies use a variety of metrics to document progress toward achieving specific goals and objectives. This guide, developed by Federal Highway Administration (FHWA) Planning and Environmental Linkages (PEL) program, is intended to hel...

  2. Wind Shear radar program future plans

    NASA Technical Reports Server (NTRS)

    Robertson, Roy E.

    1991-01-01

    The status of the Windshear Radar Program at the Collins Air Transport Division of Rockwell International is given in viewgraph form. Topics covered include goals, modifications to the WXR-700 system, flight test plans, technical approaches, design considerations, system considerations, certification, and future plans.

  3. National ITS Program Plan, Intelligent Transportation Systems, Synopsis

    DOT National Transportation Integrated Search

    THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS, THE FIRST EDITION OF THE PLAN WAS A JOINT EFFORT OF ITS AMERICA AND THE UNITED STATES DEPA...

  4. A neo-strategic planning approach to enhance local tobacco control programs.

    PubMed

    Douglas, Malinda R; Carter, Sara Sally R; Wilson, Andrew P; Chan, Andie

    2015-01-01

    Research in tobacco control demonstrating best practices is widely disseminated; however, application at the local level is often difficult. Translating research into practice requires a concerted effort to develop an understanding of the evidence and how it can be applied within diverse contexts. A strategic planning infrastructure was developed to support the translation of evidence-based interventions into community practice. This paper highlights the strategic process of turning "know-what" into "know-how" to facilitate the strategic planning and implementation of tobacco control best practices at the local level. The purpose, people, process, and product strategies of knowledge management and translation provided a framework for the strategic planning infrastructure. The knowledge translation concepts of audience, motivations, and mechanisms were synergized in the neo-strategic planning component design. The participants were 20 community coalitions funded to implement local tobacco control programs. From 2004 to 2011, the strategic planners facilitated a cyclical process to translate research into practice using a trio of integrated tools, skill-building workshops on strategic planning, and grantee-driven technical assistance and consultation. In the short term, the usefulness of the strategic planning components to the programs was measured. The intermediate outcome was the successful movement of the community programs from the planning stage to the implementation stage. The achievement of community-level changes in planned tobacco control efforts was the overall outcome measure for the success of the local coalitions. Seventeen of 20 communities that began the planning process implemented strategic plans. All 17 of the programs implemented evidence-based practices, resulting in numerous tobacco-free policies, increased cessation, and increased support from the media and community. Bridging the gap between research and practice can enhance the practicality, efficiency, and effectiveness of tobacco control programs at the local level, maximizing the potential positive health impact. Copyright © 2015 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  5. The 1989 long-range program plan

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The President's National Space Policy of 1988 reaffirms that space activities serve a variety of vital national goals and objectives, including the strengthening of U.S. scientific, technological, political, economic, and international leadership. The new policy stresses that civil space activities contribute significantly to enhancing America's world leadership. Goals and objectives must be defined and redefined, and each advance toward a given objective must be viewed as a potential building block for future programs. This important evolutionary process for research and development is reflected, describing NASA's program planning for FY89 and later years. This plan outlines the direction of NASA's future activities by discussing goals, objectives, current programs, and plans for the future. The 1989 plan is consistent with national policy for both space and aeronautics, and with the FY89 budget that the President submitted to Congress in February 1988.

  6. Integrated propulsion technology demonstrator. Program plan

    NASA Technical Reports Server (NTRS)

    1994-01-01

    NASA and Rockwell have embarked on a cooperative agreement to define, develop, fabricate, and operate an integrated propulsion technology demonstrator (IPTD) for the purpose of validating design, process, and technology improvements of launch vehicle propulsion systems. This program, a result of NRA8-11, Task Area 1 A, is jointly funded by both NASA and Rockwell and is sponsored by the Reusable Launch Vehicle office at NASA Marshall Space flight Center. This program plan provides to the joint NASA/Rockwell integrated propulsion technology demonstrator (IPTD) team a description of the activities within tasks / sub tasks and associated schedules required to successfully achieve program objectives. This document also defines the cost elements and manpower allocations for each sub task for purpose of program control. This plan is updated periodically by developing greater depth of direction for outyear tasks as the program matures. Updating is accomplished by adding revisions to existing pages or attaching page revisions to this plan. In either case, revisions will be identified by appropriate highlighting of the change, or specifying a revision page through the use of footnotes on the bottom right of each change page. Authorization for the change is provided by the principal investigators to maintain control of this program plan document and IPTD program activities.

  7. The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan

    NASA Technical Reports Server (NTRS)

    Bronstein, L.; Kawamoto, Y.; Riberich, J. J.; Scope, J. R.; Forman, B. J.; Bergman, S. G.; Reisenfeld, S.

    1981-01-01

    The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.

  8. Family planning in Tunisia and Morocco: a summary and evaluation of the recent record.

    PubMed

    Lapham, R

    1971-05-01

    Family planning activity during 1969-1970 in Morocco and Tunisia is discussed in terms of 12 criteria (such as leadership, educational services, availability) used to evaluate the programs in the 2 countries. Significant differences between family planning activity in the 2 countries can be seen in the nature of involvement of their governments through the open and public endorsement of family planning by Tunisia's president compared to the reserve of Morocco's king. Although family planning programs in both countries are organized within the Ministries of Health, the Tunisian program is conducted by a separate division, the Department of Family Planning and Maternal and Child Health, while Morocco's program is completely integrated within existing health services, a fusion which seems to create financial problems for the Moroccan family planning efforts. The Tunisian program, when compared to that of Morocco, is also characterized by a greater availability of contraceptives, more postpartum education and information activity, available induced-abortion and sterilization services, more widespread use of mass media and communication techniques and greater success in program evaluation. On a population basis, Tunisia (population of 5.2 million in 1970) has about 3 times the number of acceptors as Morocco (population of 15.4 million). Both programs have record-keeping systems which improved considerably during 1969 and 1970, but neither program has an effective field worker network. While Tunisia's program has demonstrated more success in meeting the criteria than Morocco's program and a slight decline has occurred in the crude birth rate in Tunisia in recent years, much of this decline can be attributed to a rising age at marriage resulting from the government's policies of social development. Evaluation indicated that both countries will have to increase availability of contraceptives and encourage effective use if substantial decreases in the crude birth rate are to be achieved.

  9. Using planned adaptation to implement evidence-based programs with new populations.

    PubMed

    Lee, Shawna J; Altschul, Inna; Mowbray, Carol T

    2008-06-01

    The Interactive Systems Framework (ISF) for Dissemination and Implementation (Wandersman et al. 2008) elaborates the functions and structures that move evidence-based programs (EBPs) from research to practice. Inherent in that process is the tension between implementing programs with fidelity and the need to tailor programs to fit the target population. We propose Planned Adaptation as one approach to resolve this tension, with the goal of guiding practitioners in adapting EBPs so that they maintain core components of program theory while taking into account the needs of particular populations. Planned Adaptation is a form of capacity building within the Prevention Support System that provides a framework to guide practitioners in adapting programs while encouraging researchers to provide information relevant to adaptation as a critical aspect of dissemination research, with the goal of promoting wider dissemination and better implementation of EBPs. We illustrate Planned Adaptation using the JOBS Program (Caplan et al. 1989), which was developed for recently laid-off, working- and middle-class workers and subsequently implemented with welfare recipients.

  10. Impact of computer-based treatment planning software on clinical judgment of dental students for planning prosthodontic rehabilitation

    PubMed Central

    Deshpande, Saee; Chahande, Jayashree

    2014-01-01

    Purpose Successful prosthodontic rehabilitation involves making many interrelated clinical decisions which have an impact on each other. Self-directed computer-based training has been shown to be a very useful tool to develop synthetic and analytical problem-solving skills among students. Thus, a computer-based case study and treatment planning (CSTP) software program was developed which would allow students to work through the process of comprehensive, multidisciplinary treatment planning for patients in a structured and logical manner. The present study was aimed at assessing the effect of this CSTP software on the clinical judgment of dental students while planning prosthodontic rehabilitation and to assess the students’ perceptions about using the program for its intended use. Methods A CSTP software program was developed and validated. The impact of this program on the clinical decision making skills of dental graduates was evaluated by real life patient encounters, using a modified and validated mini-CEX. Students’ perceptions about the program were obtained by a pre-validated feedback questionnaire. Results The faculty assessment scores of clinical judgment improved significantly after the use of this program. The majority of students felt it was an informative, useful, and innovative way of learning and they strongly felt that they had learnt the logical progression of planning, the insight into decision making, and the need for flexibility in treatment planning after using this program. Conclusion CSTP software was well received by the students. There was significant improvement in students’ clinical judgment after using this program. It should thus be envisaged fundamentally as an adjunct to conventional teaching techniques to improve students’ decision making skills and confidence. PMID:25170288

  11. Strategic plan, 1991: A strategy for leadership in space through excellence in space science and applications

    NASA Technical Reports Server (NTRS)

    1991-01-01

    In 1988, the Office of Space Science and Applications (OSSA) developed and published a Strategic Plan for the United States' space science and applications program during the next 5 to 10 years. The Plan presented the proposed OSSA program for the next fiscal year and defined a flexible process that provides the basis for near-term decisions on the allocation of resources and the planning of future efforts. Based on the strategies that have been developed by the advisory committees both of the National Academy of Sciences and of NASA, the Plan balances major, moderate, and small mission initiatives, the utilization of Space Station Freedom, and the requirements for a vital research base. The Plan can be adjusted to accommodate varying budget levels, both those levels that provide opportunities for an expanded science and applications program, and those that constrain growth. SSA's strategic planning is constructed around five actions: establish a set of programmatic themes; establish a set of decision rules; establish a set of priorities for missions and programs within each theme; demonstrate that the strategy can yield a viable program; and check the strategy for consistency with resource constraints. The outcome of this process is a clear, coherent strategy that meets both NASA's and OSSA's goals, that assures realism in long-range planning and advanced technology development, and that provides sufficient resiliency to respond and adapt to both known and unexpected internal and external realities. The OSSA Strategic Plan is revised annually to reflect the approval of new programs, improved understanding of requirements and issues, and any major changes in the circumstances, both within NASA and external to NASA, in which OSSA initiatives are considered.

  12. A successful integrated project.

    PubMed

    Zheng, P

    1994-10-01

    The experiences of the Juxian County Family Planning Committee of Shandong Province, China, were discussed in terms of the integration of family planning with income generation activities in rural areas. The integrated program was initiated in 1988 with pilot programs established by the Qiaoshan Family Planning Association to develop marketable skills in carpet weaving and grass braiding in Xiazhuang Town and Qiaoshan Township. The program gave priority of admission to women with only children and those who practiced family planning. 1400 women were recruited in these factories. Other income generation programs were developed for silkworm breeding and silk reeling, woolen embroidery, and printing. High ranking officials of the China Family Planning Association commended the work in income generation and family planning in Juxian County. This recognition spurred the second phase of development by the county family planning association: the establishment of village operated factories and mills for native products. By the end of 1991, there were 26 such projects in the county and per capita income to women increased by RMB 678 yuan. In the third stage of 1992, the number of association enterprises increased to 196 with recruitment of over 18,000 reproductive age women. The programs were initiated with collective funds from farmers and villages. The 170 projects in 1992 were developed with an investment of 9.6 million yuan, of which 2.26 million yuan was from individuals (23.5%). Emphasis was placed on self-reliance and recruitment of women with one child, women with 2 daughters and tubal ligations, and family planning motivators. The consequences of the integrated program were weakening traditional customs of marriage and childbearing, improvement in socioeconomic status of women, and effective service delivery of family planning and maternal and child health care services.

  13. Amy Schwab | NREL

    Science.gov Websites

    strategic scenario planning and analysis Program portfolio analysis Program management, planning and strategic execution Change management and operational improvement Research Interests Bioenergy supply chains management, organizational improvement, and program and project management. Prior Work Experience Consultant

  14. NASA Information Resources Management Long Range Plan, FY 1994-1998

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Program Specific IRM Activities by Program Office; Major IRM Program Accomplishments for FY 1992; Information Collection Budget; Summary of Computer Security Plans; and Appendix: Acronym List.

  15. FY 1998 Proposed Rail Improvement Program

    DOT National Transportation Integrated Search

    1997-01-01

    The Illinois Department of Transportation has, in the past, published its Rail program yearly, and its Rail plan as needs dictate. The department has combined : both documents into one. This new document, as with those Programs and Plans : that have ...

  16. 23 CFR 420.201 - What is the purpose of this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ....201 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING AND RESEARCH PROGRAM ADMINISTRATION Research, Development and Technology Transfer Program... requirements for research, development, and technology transfer (RD&T) activities, programs, and studies...

  17. A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki

    NASA Technical Reports Server (NTRS)

    Delaney, Michael M.; Koshimoto, Edwin T.; Noble, Deleena; Duggan, Christopher

    2010-01-01

    The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.

  18. Dr. John H. Hopps Jr. Defense Research Scholars Program

    DTIC Science & Technology

    2014-12-16

    Summer 2011) Post -Graduation Plans • Employed as a mechanical engineer at Allegion. • Applying to graduate programs in industrial design and mechanical...Summer 2010) • Multi-Layer Mirror Design for Ultra-Soft X-Rays, Ecole Polytechnique (Summer 2011) Post -Graduation Plans • Post Baccalaureate Research...the year off to work while others planned on strengthening their applications by broadening their research skills in post baccalaureate programs

  19. Choosing Wellness: Comprehensive Health Education Planning and Implementation Handbook. A Handbook for Head Start Programs [and] Resource Guide: A Guide for Head Start Programs.

    ERIC Educational Resources Information Center

    Enright, Margaret; Davidson, Tasha

    These materials consist of: (1) a planning and implementation handbook designed to help Head Start managers better understand, plan, and implement a more comprehensive aproach to health education and health promotion--one that addresses local needs and tailors programs to the needs of the children, parents, and staff; and (2) a resource guide that…

  20. FY 2013 Educational Facilities Master Plan and the FY 2013-2018 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2012

    2012-01-01

    The FY 2013 Educational Facilities Master Plan (Master Plan) and the FY 2013-2018 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of…

  1. FY 2012 Educational Facilities Master Plan and the Amended FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2011

    2011-01-01

    The FY 2012 Educational Facilities Master Plan (Master Plan) and Amendments to the FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the…

  2. Manned Orbital Transfer Vehicle (MOTV). Volume 6: Five year program plan

    NASA Technical Reports Server (NTRS)

    Boyland, R. E.; Sherman, S. W.; Morfin, H. W.

    1979-01-01

    The five year program plan for the manned orbit transfer vehicle (MOTV) is presented. The planning, schedules, cost estimates, and supporting data (objectives, constraints, assumptions, etc.) associated with the development of the MOTV are discussed. The plan, in addition to the above material, identifies the supporting research and technology required to resolve issues critical to MOTV development.

  3. 20 CFR 669.660 - What planning documents and information are required in the application for MSFW youth grants and...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What planning documents and information are... PROGRAM UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT The MSFW Youth Program § 669.660 What planning...? The required planning documents and other required information and the submission dates for filing are...

  4. FY 2007 Educational Facilities Master Plan and the FY 2007-2012 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2006

    2006-01-01

    The FY 2007 Educational Facilities Master Plan (Master Plan) and FY 2007-2012 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  5. An effectiveness monitoring program for the northwest forest plan: new approaches to common monitoring problems

    Treesearch

    Craig Palmer; Barry Mulder; Barry Noon

    2000-01-01

    The Northwest Forest Plan is a large-scale ecosystem management plan for federal lands in the Pacific Northwest of the United States. An effectiveness monitoring program has been developed to determine the extent to which the goals and objectives of this Plan are being achieved. Priority resources identified for ecological monitoring include late-successional and old-...

  6. 77 FR 72581 - Patient Protection and Affordable Care Act; Establishment of the Multi-State Plan Program for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-05

    ... least two multi-State plans (MSPs) on each of the Affordable Insurance Exchanges (Exchanges). Under the... issuers to offer at least two multi-State plans (MSPs) on each of the Exchanges in the 50 States and the... Patient Protection and Affordable Care Act; Establishment of the Multi- State Plan Program for the...

  7. Challenging the Future - Journey to Excellence. Aeropropulsion strategic plan for the 1990's

    NASA Astrophysics Data System (ADS)

    Over the past several months, the Lewis Aeropropulsion Management Council (AMC) has conducted a critical assessment of its strategic plan. This assessment clearly indicated a need for change, both in the aeropropulsion program emphasis and in the approach to carrying out that program. Customers sent a strong message that the program must improve the timeliness of research and technology products and services and must work more closely with them to develop and transfer new technology. The strategic plan defines AMC's vision for the future and underlying organizational values. It contains a set of broad strategies and actions that point the way toward achieving the goals of customer satisfaction, organizational effectiveness, and programmatic excellence. Those strategies are expected to form the basis for the development of specific tactical plans by Lewis aeropropulsion thrust teams, divisions, and branches. To guide tactical planning of the aeropropulsion program, this strategic plan outlines the agency's strategic directions and long-range aeronautics goals, the aeropropulsion goals and key objectives for achieving them, projections of Lewis aeropropulsion budgets, planned allocations of resources, and the processes that will be used to measure success in carrying out the strategic plan.

  8. Challenging the Future - Journey to Excellence. Aeropropulsion strategic plan for the 1990's

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Over the past several months, the Lewis Aeropropulsion Management Council (AMC) has conducted a critical assessment of its strategic plan. This assessment clearly indicated a need for change, both in the aeropropulsion program emphasis and in the approach to carrying out that program. Customers sent a strong message that the program must improve the timeliness of research and technology products and services and must work more closely with them to develop and transfer new technology. The strategic plan defines AMC's vision for the future and underlying organizational values. It contains a set of broad strategies and actions that point the way toward achieving the goals of customer satisfaction, organizational effectiveness, and programmatic excellence. Those strategies are expected to form the basis for the development of specific tactical plans by Lewis aeropropulsion thrust teams, divisions, and branches. To guide tactical planning of the aeropropulsion program, this strategic plan outlines the agency's strategic directions and long-range aeronautics goals, the aeropropulsion goals and key objectives for achieving them, projections of Lewis aeropropulsion budgets, planned allocations of resources, and the processes that will be used to measure success in carrying out the strategic plan.

  9. [The family planning program in Rwanda: assessment of ten years (1981-1991) and prospects].

    PubMed

    Munyakazi, A

    1990-12-01

    Rwanda's official family planning policy dates back to 1981 and creation of the National Office of Population (ONAPO). Among its other function, ONAPO monitors proper use of family planning methods and studies the integration of family planning services into public health. Pilot family planning programs began in the prefectures of Butare, Kigali, and Ruhengeri and were extended to the other 7 around 1985. The development of family planning services in Rwanda is based on their integration into existing services, especially those devoted to maternal-child health. In 1989, 277 of the 350 health centers of all kinds in Rwanda and 12 secondary posts offered family planning services. The rate of integration was 79.4%. 185 of the 277 health services with family planning services were in the public sector. As of December 1989, the rate of integration in different prefectures varied from a high of 95.5% in Kibungo to a low of 64.9% in Gisenyi. Integration is particularly weak in health facilities administered by the Catholic Church. The 2 strategies to confront this situation are continuing dialogue with Catholic Church officials and creation of secondary family planning posts to improve accessibility to family planning for populations served by Church health services. The number of new and continuing family planning users increased from 1178 and 1368 respectively in 1982 to 66,950 and 104,604 through September 1990. There is wide variation from 1 prefecture to another in recruitment of new acceptors and in the number of acceptors per health facility. Recruitment of new acceptors is greatest in Ruhengeri, followed by Kigali and Byumba. As of September 1990, 28,943 women used pills, 2037 used IUDs, 66,515 used injectables, 3051 used barrier methods, 2888 used auto-observation methods, 343 used implants, and 588 were sterilized. The overall rate of contraceptive prevalence increased from .9% in 1983 to 6.2% in 1989 and 10% in 1990. The strategy for promoting family planning has included training of personnel, improvement of supervision, regular supply of contraceptive equipment and supplies to health supervision, regular supply of contraceptive equipment and supplies to health centers, diversification of available methods, and addition of secondary family planning posts to improve accessibility. Obstacles still affecting Rwanda's family planning program include the pronatalist cultural orientation, which is being confronted by a vigorous IEC program. The reluctance of Catholic-affiliated health services to offer modern family planning methods, the shortage of trained family planning workers, contraceptive supply problems, and geographic inaccessibility of family planning services are other serious problems. To confront these problems, ONAPO plans to begin social marketing program, create more secondary health planning posts, promote integration of family planning services into the vaccination program, strengthen efforts to motivate postpartum women, and undertake a community distribution program for condoms and spermicides.

  10. Implementation of a new advanced graduate education program in oral implantology.

    PubMed

    Gallucci, German O; Weber, Hans Peter; Kalenderian, Elsbeth

    2012-10-01

    The academic program for the Harvard School of Dental Medicine's Advanced Graduate Program in Oral Implantology is based on scientific evidence applied to educational quality, translational research, patient care, and service. The objective of the program is to enable highly motivated individuals with proven scholarship and excellence in patient care to achieve academic leadership in the clinical and scientific fields of implant dentistry and tissue regeneration. A detailed curriculum describing the academic program, as well as a business plan (which included a management plan describing the organizational structure, financial implications, and market forces) and implementation and communication plans, were developed before moving forward. With careful academic and business planning, the result was a vibrant implant program, in which all placements and restorations of implants are coordinated with regard to practice management. The program is integrated into the existing clinical care model and has been financially self-sustaining from its inception. Six students have participated in the last two years. On average, each student performed seventy-nine procedures on twenty-nine patients, generating over $46,000 in production. The curriculum includes didactics, hands-on clinical learning, and research activities. Research is a critical component as well. The results demonstrate that the time taken to develop a detailed curriculum and business plan for a new academic program, which anticipated and resolved potential barriers to success, was instrumental in the successful implementation of an oral implantology residency program.

  11. Developing a Parent-Centered Obesity Prevention Program for 4-H Families: Implications for Extension Family Programming

    ERIC Educational Resources Information Center

    Benke, Carrie J.; Bailey, Sandra J.; Martz, Jill; Paul, Lynn; Lynch, Wesley; Eldridge, Galen

    2013-01-01

    Planning youth and family programming in the 21st century is daunting given family members' busy schedules. This is even more challenging when planning programs in rural areas, where there are vast distances between communities. This article discusses a research and educational outreach project that uses best practices in program development…

  12. Evaluating a Small-Group Counseling Program--A Model for Program Planning and Improvement in the Elementary Setting

    ERIC Educational Resources Information Center

    Bostick, Dee; Anderson, Ron

    2009-01-01

    School counselors are under increasing pressure to evaluate their programs in a manner consistent with teachers and other educators. A small-group counseling intervention was used by a school counselor as part of a three-level program planning initiative that illustrated best research practices to evaluate program outcomes. Forty-nine third-grade…

  13. A Plan for Developing a Program of Adult Education to Meet the Needs of a Local Community.

    ERIC Educational Resources Information Center

    Smith, Harold K.

    Using local and national data, this study examined adult education program offerings in East Orange, New Jersey, potential participants' needs and interests, and program needs reported by business and industrial leaders. A plan was proposed for an appropriate community wide program. Data from public school adult education programs in 142 cities…

  14. Strategic planning in an academic radiation medicine program.

    PubMed

    Hamilton, J L; Foxcroft, S; Moyo, E; Cooke-Lauder, J; Spence, T; Zahedi, P; Bezjak, A; Jaffray, D; Lam, C; Létourneau, D; Milosevic, M; Tsang, R; Wong, R; Liu, F F

    2017-12-01

    In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations.

  15. Strategic planning in an academic radiation medicine program

    PubMed Central

    Hamilton, J.L.; Foxcroft, S.; Moyo, E.; Cooke-Lauder, J.; Spence, T.; Zahedi, P.; Bezjak, A.; Jaffray, D.; Lam, C.; Létourneau, D.; Milosevic, M.; Tsang, R.; Wong, R.; Liu, F.F.

    2017-01-01

    Background In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Methods Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. Results The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. Conclusions The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations. PMID:29270061

  16. Strategic Plan. Volume 1

    NASA Technical Reports Server (NTRS)

    2002-01-01

    The purpose of this document is to present the strategic plan and associated organizational structure that the National Space Biomedical Research Institute (NSBRI) will utilize to achieve the defined mission and objectives provided by NASA. Much of the information regarding the background and establishment of the NSBRI by NASA has been provided in other documentation and will not be repeated in this Strategic Plan. This Strategic Plan is presented in two volumes. Volume I (this volume) begins with an Introduction (Section 2) that provides the Institute's NASA-defined mission and objectives, and the organizational structure adopted to implement these through three Strategic Programs: Countermeasure Research; Education, Training and Outreach; and Cooperative Research and Development. These programs are described in Sections 3 to 5. Each program is presented in a similar way, using four subsections: Goals and Objectives; Current Strategies; Gaps and Modifications; and Resource Requirements. Section 6 provides the administrative infrastructure and total budget required to implement the Strategic Programs and assures that they form a single cohesive plan. This plan will ensure continued success of the Institute for the next five years. Volume II of the Strategic Plan provides an in-depth analysis of the current and future strategic programs of the 12 current NSBRI teams, including their goals, objectives, mutual interactions and schedules.

  17. 40 CFR 35.410 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants (section 205(j)(2)) § 35.410 Purpose. (a) Purpose of section. Sections 35.410 through 35.418 govern Water Quality Management Planning... the Act. (b) Purpose of program. EPA awards Water Quality Management Planning Grants to carry out...

  18. 77 FR 33498 - Joint Industry Plans; Order Approving, on a Pilot Basis, the National Market System Plan To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-06

    ... pilot program, which was implemented through a series of rule filings by the Exchanges and FINRA. This... as a one-year pilot program in two Phases. Phase I of the Plan would be implemented immediately...

  19. Curriculum Planning Guidelines for Tobacco Use Prevention and Education.

    ERIC Educational Resources Information Center

    Montana State Office of Public Instruction, Helena.

    This curriculum planning guide is designed to help Montana school districts design an appropriate tobacco use prevention and education program. It focuses on: "Tobacco Use Prevention Education: The OPI (Office of Public Instruction) Perspective"; "Instructional Guidelines" (key issues in program planning and major health…

  20. 25 CFR 170.415 - What is pre-project planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Long-Range... sources and identification of other funding sources to expedite the planning, design, and construction of...

  1. National ITS Program Plan, Intelligent Transportation Systems Volume II

    DOT National Transportation Integrated Search

    1995-03-01

    THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS, THE FIRST EDITION OF THE PLAN WAS A JOINT EFFORT OF ITS AMERICA AND THE UNITED STATES DEPA...

  2. Facilities Guidelines for Fine Arts Programs.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore.

    This manual of facility guidelines examines the planning process and design features and considerations for public school fine arts programs in Maryland. Planning concepts and trends are highlighted followed by planning guidelines for dance, music, theater, visual arts, general education, and performance spaces. General design considerations…

  3. 10 CFR 436.2 - General objectives.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS § 436.2 General objectives. The objectives of Federal energy management and planning programs are: (a) To apply energy... use of energy in all agency operations through general operations plans. [55 FR 48220, Nov. 20, 1990...

  4. Update of FDOT state park & ride lot program planning manual chapters 3, 4, and 6

    DOT National Transportation Integrated Search

    2001-04-01

    Portions of the Florida Department of Transportation (FDOT) State Park & Ride Lot Program Planning Manual, first published in 1989 and revised in 1996, were updated. The scope included examination, testing, and updating, as necessary, the planning fo...

  5. 24 CFR 1003.206 - Program administration costs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... reasonable administrative costs and carrying charges related to the planning and execution of community... this section and in § 1003.205—Eligible planning, urban environmental design and policy-planning... documents related to the program for submission to HUD; (vii) Coordinating the resolution of audit and...

  6. 40 CFR 35.410 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants (section 205(j)(2)) § 35.410 Purpose. (a) Purpose of section. Sections 35.410 through 35.418 govern Water Quality Management Planning... the Act. (b) Purpose of program. EPA awards Water Quality Management Planning Grants to carry out...

  7. 40 CFR 35.410 - Purpose.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants (section 205(j)(2)) § 35.410 Purpose. (a) Purpose of section. Sections 35.410 through 35.418 govern Water Quality Management Planning... the Act. (b) Purpose of program. EPA awards Water Quality Management Planning Grants to carry out...

  8. 40 CFR 35.410 - Purpose.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants (section 205(j)(2)) § 35.410 Purpose. (a) Purpose of section. Sections 35.410 through 35.418 govern Water Quality Management Planning... the Act. (b) Purpose of program. EPA awards Water Quality Management Planning Grants to carry out...

  9. 40 CFR 35.410 - Purpose.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants (section 205(j)(2)) § 35.410 Purpose. (a) Purpose of section. Sections 35.410 through 35.418 govern Water Quality Management Planning... the Act. (b) Purpose of program. EPA awards Water Quality Management Planning Grants to carry out...

  10. Fusion Simulation Program Definition. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cary, John R.

    2012-09-05

    We have completed our contributions to the Fusion Simulation Program Definition Project. Our contributions were in the overall planning with concentration in the definition of the area of Software Integration and Support. We contributed to the planning of multiple meetings, and we contributed to multiple planning documents.

  11. Women's experiences after Planned Parenthood's exclusion from a family planning program in Texas.

    PubMed

    Woo, C Junda; Alamgir, Hasanat; Potter, Joseph E

    2016-04-01

    We assessed the impact on depot medroxyprogesterone continuation when a large care provider was banned from a state-funded family planning program. We used three methods to assess the effect of the ban: (a) In a records review, we compared how many state program participants returned to two Planned Parenthood affiliates for a scheduled dose of depot medroxyprogesterone acetate (DMPA) immediately after the ban; (b) We conducted phone interviews with 224 former Planned Parenthood patients about DMPA use and access to contraception immediately after the ban; (c) We compared current contraceptive method of our interviewees to that of comparable DMPA users in the National Survey of Family Growth 2006-2010 (NSFG). (a) Fewer program clients returned for DMPA at a large urban Planned Parenthood, compared to a remotely located affiliate (14.4%, vs. 64.8%), reflecting different levels of access to alternative providers in the two cities. (b) Among program participants who went elsewhere for the injection, only 56.8% obtained it at no cost and on time. More than one in five women missed a dose because of barriers, most commonly due to difficulty finding a provider. (c) Compared to NSFG participants, our interviewees used less effective methods of contraception, even more than a year after the ban went into effect. Injectable contraception use was disrupted during the rollout of the state-funded family planning program. Women living in a remote area of Texas encountered more barriers. Requiring low-income family planning patients to switch healthcare providers has adverse consequences. Copyright © 2016 Elsevier Inc. All rights reserved.

  12. Women’s experiences after Planned Parenthood’s exclusion from a family planning program in Texas☆

    PubMed Central

    Woo, C. Junda; Alamgir, Hasanat; Potter, Joseph E.

    2016-01-01

    Objective We assessed the impact on depot medroxyprogesterone continuation when a large care provider was banned from a state-funded family planning program. Study Design We used three methods to assess the effect of the ban: (a) In a records review, we compared how many state program participants returned to two Planned Parenthood affiliates for a scheduled dose of depot medroxyprogesterone acetate (DMPA) immediately after the ban; (b) We conducted phone interviews with 224 former Planned Parenthood patients about DMPA use and access to contraception immediately after the ban; (c) We compared current contraceptive method of our interviewees to that of comparable DMPA users in the National Survey of Family Growth 2006–2010 (NSFG). Results (a) Fewer program clients returned for DMPA at a large urban Planned Parenthood, compared to a remotely located affiliate (14.4%, vs. 64.8%), reflecting different levels of access to alternative providers in the two cities. (b) Among program participants who went elsewhere for the injection, only 56.8% obtained it at no cost and on time. More than one in five women missed a dose because of barriers, most commonly due to difficulty finding a provider. (c) Compared to NSFG participants, our interviewees used less effective methods of contraception, even more than a year after the ban went into effect. Conclusions Injectable contraception use was disrupted during the rollout of the state-funded family planning program. Women living in a remote area of Texas encountered more barriers. Implications Requiring low-income family planning patients to switch healthcare providers has adverse consequences. PMID:26680757

  13. Implementation and Clinical Outcomes of an Employer-Sponsored, Pharmacist-Provided Medication Therapy Management Program.

    PubMed

    Theising, Katie M; Fritschle, Traci L; Scholfield, Angelina M; Hicks, Emily L; Schymik, Michelle L

    2015-11-01

    Our objective was to describe the implementation and clinical outcomes of an employer-sponsored, pharmacist-provided medication therapy management (MTM) program for health plan beneficiaries with diabetes mellitus and/or hypertension. We conducted a single-center retrospective medical record review. The setting was a Pharmacy MTM Clinic at a self-insured health system consisting of six hospitals and several ancillary facilities. A total of 161 health plan beneficiaries with diabetes identified during annual wellness screenings for the health plan in 2012 and 225 health plan beneficiaries with diabetes and/or hypertension identified during annual wellness screenings for the health plan in 2013 were referred to the MTM clinic based on specific criteria. In 2012 the health system expanded its existing wellness program by implementing a voluntary diabetes care program for health plan beneficiaries with uncontrolled diabetes (hemoglobin A(1c) [A1C] 7% or higher); a similar program was added for hypertension for the 2013 plan year. All participants' A1C and blood pressure results were tracked from the date of their wellness screening through the end of the plan year. The pharmacists involved had the capability to directly implement drug regimen changes according to hospital protocol or provide recommendations to the physician, as specified by the referring physician. For the 2012-2013 plan year, the mean difference in A1C from baseline to program completion was -0.38% (95% confidence interval [CI] -0.58 to -0.18%, p<0.05). For beneficiaries with a baseline A1C of 7% or higher, the mean difference was -0.69% (95% CI -0.99 to -0.39%, p<0.05). For the 2013-2014 plan year, the mean difference in A1C from baseline to program completion was -0.62% (95% CI -0.81 to -0.44%, p<0.05). In that year, the mean difference in A1C for beneficiaries with A1C 7% or higher was -0.97% (95% CI -1.23 to -0.72%, p<0.05). For those referred for hypertension, a mean difference of -13 mm Hg (95% CI -18.59 to -7.73, p<0.05) from baseline to program completion was seen in systolic blood pressure, and the mean difference in diastolic blood pressure was -7 mm Hg (95% CI -9.92 to -4.04, p<0.05). This study demonstrated that health plan beneficiaries who participated in the employer-sponsored, pharmacist-provided MTM program had significant decreases in A1C and blood pressure. © 2015 Pharmacotherapy Publications, Inc.

  14. Development of a program logic model and evaluation plan for a participatory ergonomics intervention in construction.

    PubMed

    Jaegers, Lisa; Dale, Ann Marie; Weaver, Nancy; Buchholz, Bryan; Welch, Laura; Evanoff, Bradley

    2014-03-01

    Intervention studies in participatory ergonomics (PE) are often difficult to interpret due to limited descriptions of program planning and evaluation. In an ongoing PE program with floor layers, we developed a logic model to describe our program plan, and process and summative evaluations designed to describe the efficacy of the program. The logic model was a useful tool for describing the program elements and subsequent modifications. The process evaluation measured how well the program was delivered as intended, and revealed the need for program modifications. The summative evaluation provided early measures of the efficacy of the program as delivered. Inadequate information on program delivery may lead to erroneous conclusions about intervention efficacy due to Type III error. A logic model guided the delivery and evaluation of our intervention and provides useful information to aid interpretation of results. © 2013 Wiley Periodicals, Inc.

  15. Development of a Program Logic Model and Evaluation Plan for a Participatory Ergonomics Intervention in Construction

    PubMed Central

    Jaegers, Lisa; Dale, Ann Marie; Weaver, Nancy; Buchholz, Bryan; Welch, Laura; Evanoff, Bradley

    2013-01-01

    Background Intervention studies in participatory ergonomics (PE) are often difficult to interpret due to limited descriptions of program planning and evaluation. Methods In an ongoing PE program with floor layers, we developed a logic model to describe our program plan, and process and summative evaluations designed to describe the efficacy of the program. Results The logic model was a useful tool for describing the program elements and subsequent modifications. The process evaluation measured how well the program was delivered as intended, and revealed the need for program modifications. The summative evaluation provided early measures of the efficacy of the program as delivered. Conclusions Inadequate information on program delivery may lead to erroneous conclusions about intervention efficacy due to Type III error. A logic model guided the delivery and evaluation of our intervention and provides useful information to aid interpretation of results. PMID:24006097

  16. Responding to the Effects of Extreme Heat: Baltimore City's Code Red Program.

    PubMed

    Martin, Jennifer L

    2016-01-01

    Heat response plans are becoming increasingly more common as US cities prepare for heat waves and other effects of climate change. Standard elements of heat response plans exist, but plans vary depending on geographic location and distribution of vulnerable populations. Because heat events vary over time and affect populations differently based on vulnerability, it is difficult to compare heat response plans and evaluate responses to heat events. This article provides an overview of the Baltimore City heat response plan, the Code Red program, and discusses the city's response to the 2012 Ohio Valley/Mid Atlantic Derecho, a complex heat event. Challenges with and strategies for evaluating the program are reviewed and shared.

  17. Configuration Management Plan for K Basins

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weir, W.R.; Laney, T.

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less

  18. [Comment on "La Calidad de Atencion en la Provision de Servicios Clinicos" of Juan Diaz and Hans Halbe].

    PubMed

    Trias, M

    1990-12-01

    Rather than a commentary on a specific article, this work contains reflections on the concept of quality in provision of family planning services and its possible use to deflect family planning efforts. Quality is a difficult concept to define precisely. Applied to family planning, it may be defined as the totality of attributes possessed by a program that does not place impediments in the way of comfortable adoption of a contraceptive method. Another definition of quality, achievable only by a long list of ideal characteristics which are often expensive and sometimes unattainable, has been and continues to be used by enemies of family planning to slow its diffusion; they hold that if perfect quality is not offered, it is better to offer nothing. A specific tactic of this group is to oppose the quantity of services with their quality. The hard-fought campaign to discredit the measurement of concrete goals and results is part of this strategy. But it is apparent that without a reasonably satisfactory quality of service, no program would achieve significant growth. People would not continue to come, and in growing numbers, to a program where they received poor quality service. Each goal, each statistic, each percentage represents human problems confronted and resolved by programs and personnel. Profamilia has become 1 of the largest nongovernmental family planning organizations. Profamilia has always paid attention to the quality of its services and has conducted numerous studies to assess results and identify shortcomings. The high percentage of positive results attests to the quality of Profamilia programs. In an age of scarce resources and tight budgets, the objective of family planning programs is to provide an austere but acceptable quality of attention so that the quantity of services will be sufficient to meet demand. Program elements that have a real cost without offering a measurable benefit should be avoided. Another problem is that integrated programs that aim to combine family planning with maternal-child health or other services often end by neglecting the family planning component. Profamilia believes that good information should be provided with services, but it is limited to what is needed for proper and safe use of each method. And integration is not presently needed to disguise or dress up family planning programs. It is justifiable only when for political reasons there is no alternative or when it can provide other resources to subsidize family planning programs.

  19. Business process modeling for the Virginia Department of Transportation : a demonstration with the integrated six-year improvement program and the statewide transportation improvement program : executive summary.

    DOT National Transportation Integrated Search

    2005-01-01

    This effort demonstrates business process modeling to describe the integration of particular planning and programming activities of a state highway agency. The motivations to document planning and programming activities are that: (i) resources for co...

  20. 76 FR 23583 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-27

    ... Management Program Power Marketing Initiative to the Boulder Canyon Project AGENCY: Western Area Power...), will apply the Energy Planning and Management Program (Program) Power Marketing Initiative (PMI), as modified in this notice, to the Boulder Canyon Project (BCP), as proposed in a Federal Register notice (FRN...

  1. 78 FR 60285 - Final Notice To Announce the Implementation of Required Electronic Submission of State or Tribal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-01

    ... Financial Reporting Forms for Mandatory Grant Programs AGENCY: Office of Administration (OA), ACF, HHS... Tribal plans, and program and financial reporting forms for mandatory grant programs to ACF's Online Data... mandatory grant programs will be required to submit State plans, and programmatic and financial reporting...

  2. Mississippi Curriculum Framework for Horticulture (Program CIP: 01.0601--Horticulture Serv. Op. & Mgmt., Gen.). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for horticulture I and II. Presented first are a program description and…

  3. Summer Splash. 1988 Wisconsin Summer Library Program Manual. Bulletin No. 8230.

    ERIC Educational Resources Information Center

    Lamb, Donald K.; And Others

    A compilation of materials contributed by and developed with the cooperation of Wisconsin librarians and Ohio's 1987 summer reading program, this planning manual provides guidelines for planning and promoting summer programs for young people by librarians in the state of Wisconsin. The theme of the program, "Summer Splash," is intended…

  4. 77 FR 1785 - FTA Fiscal Year 2012 Apportionments, Allocations, and Program Information

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... and Research Program Grants, dated September 1, 2008. For more information, contact Victor Austin... Fund of the United States Treasury, which are Administrative Expenses, the New Starts and Research... Planning Program (49 U.S.C. 5305(d)) B. State Planning and Research Program (49 U.S.C. 5305(e)) C...

  5. 78 FR 28699 - Notice to Rescind a Notice of Intent To Prepare an Environmental Impact Statement (EIS): Dickson...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ... CONTACT: Ms. Theresa Claxton, Planning and Program Management Team Leader, Federal Highway Administration... INFORMATION: The FHWA, in cooperation with the Tennessee Department of Transportation (TDOT), is rescinding... programs and activities apply to this proposed program.) Theresa Claxton, Planning and Program Mgmt. Team...

  6. Readings in Health and Medical Technology Education Programs. Vision 2.

    ERIC Educational Resources Information Center

    Frederick, Molly, Ed.

    This collection of articles is a foundation-supported publication and will be of special interest to those planning health education curriculums and programs. They fall into three sections: a background article, a set of articles about actual programs, and a comprehensive collection of articles about planning the associate degree program in the…

  7. Mississippi Curriculum Framework for Welding (Program CIP: 48.0508--Welder/Welding Technologist). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for welding I and II. Presented first are a program description and course…

  8. Action Research: Effective Marketing Strategies for a Blended University Program

    ERIC Educational Resources Information Center

    Cook, Ruth Gannon; Ley, Kathryn

    2008-01-01

    This action research study investigated a marketing plan based on collaboration among a program faculty team and other organizational units for a graduate professional program. From its inception through the second year of operation, program enrollment increased due to the marketing plan based on an effective approach grounded in simple marketing…

  9. Goal programming for land use planning.

    Treesearch

    Enoch F. Bell

    1976-01-01

    A simple transformation of the linear programing model used in land use planning to a goal programing model allows the multiple goals implied by multiple use management to be explicitly recognized. This report outlines the procedure for accomplishing the transformation and discusses problems with use of goal programing. Of particular concern are the expert opinions...

  10. Mississippi Curriculum Framework for Agriscience (Program CIP: 02.0101--Agriculture Science). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for agriscience I and II. Presented first are a program description and…

  11. Very Low-Cost Nutritious Diet Plans Designed by Linear Programming.

    ERIC Educational Resources Information Center

    Foytik, Jerry

    1981-01-01

    Provides procedural details of Linear Programing, developed by the U.S. Department of Agriculture to devise a dietary guide for consumers that minimizes food costs without sacrificing nutritional quality. Compares Linear Programming with the Thrifty Food Plan, which has been a basis for allocating coupons under the Food Stamp Program. (CS)

  12. Timber management planning with timber ram and goal programming

    Treesearch

    Richard C. Field

    1978-01-01

    By using goal programming to enhance the linear programming of Timber RAM, multiple decision criteria were incorporated in the timber management planning of a National Forest in the southeastern United States. Combining linear and goal programming capitalizes on the advantages of the two techniques and produces operationally feasible solutions. This enhancement may...

  13. Mississippi Curriculum Framework for Automotive Mechanics (Program CIP: 47.0604--Auto/Automotive Mechanic/Tech). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for automotive mechanics I and II. Presented first are a program description…

  14. Preparing for High Technology: Robotics Programs. Research & Development Series No. 233.

    ERIC Educational Resources Information Center

    Ashley, William; And Others

    This guide is one of three developed to provide guidelines, information, and resources useful in planning and developing postsecondary technician training programs in high technology. It is specifically intended for program planners and developers in the initial stages of planning a new program or specialized option in robotics. (Two companion…

  15. Mississippi Curriculum Framework for Allied Health (Program CIP: 51.1699--Nursing, Other). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for allied health I and II. Presented first are a program description and…

  16. Mississippi Curriculum Framework for Introduction to Agriscience (Program CIP: 02.9990--Introduction to Agriculture Science). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for the introduction to agriscience program. Presented first are a program…

  17. Vouchers for family planning and sexual and reproductive health services: a review of voucher programs involving Marie Stopes International among 11 Asian and African countries.

    PubMed

    Eva, Gillian; Quinn, Andrew; Ngo, Thoai D

    2015-08-01

    To evaluate provision of vouchers for family planning and sexual and reproductive health (SRH) services. A review was conducted to assess the effects of 24 voucher programs in Marie Stopes International programs across 11 countries in Asia and Africa between 2005 and the present. The outcome measures were uptake of services; service use among specific subgroups; user satisfaction with service quality; and efficiency of service delivery. Twelve of the 24 programs covered family planning only, whereas the other 12 programs covered family planning and/or SRH. Service uptake increased following implementation, although voucher redemption rates varied by program (44.1%-92.4%). Most programs were successful in reaching subgroups, such as the poor and young (under 25years), although this outcome depended on the targeting approach. Most programs recorded high user satisfaction; however, the evidence regarding efficiency was mixed. Vouchers increased uptake of services and, in some cases, improved service quality and reach to specific groups. Nevertheless, robust evaluation designs are required to measure efficiency. Copyright © 2015. Published by Elsevier Ireland Ltd.

  18. 7 CFR 1206.50 - Programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... PROMOTION, RESEARCH, AND INFORMATION Mango Promotion, Research, and Information Order Definitions Promotion, Research, and Information § 1206.50 Programs, plans, and projects. (a) The Board shall receive and evaluate... establishment, issuance, effectuation, and administration of appropriate programs for promotion, research, and...

  19. 7 CFR 1221.121 - Programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... PROMOTION, RESEARCH, AND INFORMATION ORDER Sorghum Promotion, Research, and Information Order Promotion, Research, and Information § 1221.121 Programs, plans, and projects. (a) The Board shall receive and... establishment, issuance, effectuation, and administration of appropriate programs for promotion, research, and...

  20. Health plan switching among members of the Federal Employees Health Benefits Program.

    PubMed

    Atherly, Adam; Florence, Curtis; Thorpe, Kenneth E

    2005-01-01

    This paper examines factors associated with switching health plans in the Federal Employees Health Benefits Program. Switching plans is not uncommon, with 12% of members switching plans annually. Individuals switch out of plans with premium increases and benefit decreases relative to other plans in the market. Switching is negatively associated with age due to increasing switching costs associated with age rather than decreasing premium sensitivity. Individuals in preferred provider organizations are less likely to switch, but are more responsive to premium increases than those in the managed care sector. Those who do switch plans are likely to switch to a different plan in the same sector.

  1. Medicaid program; self-directed personal assistance services program State Plan option (cash and counseling). Final rule.

    PubMed

    2008-10-03

    This final rule provides guidance to States that want to administer self-directed personal assistance services through their State Plans, as authorized by the Deficit Reduction Act of 2005. The State plan option allows beneficiaries, through an approved self-directed services plan and budget, to purchase personal assistance services. The rule also provides guidance to ensure beneficiary health and welfare and financial accountability of the State Plan option.

  2. Robinson Rancheria Strategic Energy Plan; Middletown Rancheria Strategic Energy Plan, Scotts Valley Rancheria Strategic Energy Plan, Elem Indian Colony Strategic Energy Plan, Upperlake Rancheria Strategic Energy Plan, Big Valley Rancheria Strategic Energy Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGinnis and Associates LLC

    2008-08-01

    The Scotts Valley Band of Pomo Indians is located in Lake County in Northern California. Similar to the other five federally recognized Indian Tribes in Lake County participating in this project, Scotts Valley Band of Pomo Indians members are challenged by generally increasing energy costs and undeveloped local energy resources. Currently, Tribal decision makers lack sufficient information to make informed decisions about potential renewable energy resources. To meet this challenge efficiently, the Tribes have committed to the Lake County Tribal Energy Program, a multi Tribal program to be based at the Robinson Rancheria and including The Elem Indian Colony, Bigmore » Valley Rancheria, Middletown Rancheria, Habematolel Pomo of Upper Lake and the Scotts Valley Pomo Tribe. The mission of this program is to promote Tribal energy efficiency and create employment opportunities and economic opportunities on Tribal Lands through energy resource and energy efficiency development. This program will establish a comprehensive energy strategic plan for the Tribes based on Tribal specific plans that capture economic and environmental benefits while continuing to respect Tribal cultural practices and traditions. The goal is to understand current and future energy consumption and develop both regional and Tribe specific strategic energy plans, including action plans, to clearly identify the energy options for each Tribe.« less

  3. Application programming in C# environment with recorded user software interactions and its application in autopilot of VMAT/IMRT treatment planning.

    PubMed

    Wang, Henry; Xing, Lei

    2016-11-08

    An autopilot scheme of volumetric-modulated arc therapy (VMAT)/intensity-modulated radiation therapy (IMRT) planning with the guidance of prior knowl-edge is established with recorded interactions between a planner and a commercial treatment planning system (TPS). Microsoft (MS) Visual Studio Coded UI is applied to record some common planner-TPS interactions as subroutines. The TPS used in this study is a Windows-based Eclipse system. The interactions of our application program with Eclipse TPS are realized through a series of subrou-tines obtained by prerecording the mouse clicks or keyboard strokes of a planner in operating the TPS. A strategy to autopilot Eclipse VMAT/IMRT plan selection process is developed as a specific example of the proposed "scripting" method. The autopiloted planning is navigated by a decision function constructed with a reference plan that has the same prescription and similar anatomy with the case at hand. The calculation proceeds by alternating between the Eclipse optimization and the outer-loop optimization independent of the Eclipse. In the C# program, the dosimetric characteristics of a reference treatment plan are used to assess and modify the Eclipse planning parameters and to guide the search for a clinically sensible treatment plan. The approach is applied to plan a head and neck (HN) VMAT case and a prostate IMRT case. Our study demonstrated the feasibility of application programming method in C# environment with recorded interactions of planner-TPS. The process mimics a planner's planning process and automatically provides clinically sensible treatment plans that would otherwise require a large amount of manual trial and error of a planner. The proposed technique enables us to harness a commercial TPS by application programming via the use of recorded human computer interactions and provides an effective tool to greatly facilitate the treatment planning process. © 2016 The Authors.

  4. Application programming in C# environment with recorded user software interactions and its application in autopilot of VMAT/IMRT treatment planning

    PubMed Central

    Wang, Henry

    2016-01-01

    An autopilot scheme of volumetric‐modulated arc therapy (VMAT)/intensity‐modulated radiation therapy (IMRT) planning with the guidance of prior knowledge is established with recorded interactions between a planner and a commercial treatment planning system (TPS). Microsoft (MS) Visual Studio Coded UI is applied to record some common planner‐TPS interactions as subroutines. The TPS used in this study is a Windows‐based Eclipse system. The interactions of our application program with Eclipse TPS are realized through a series of subroutines obtained by prerecording the mouse clicks or keyboard strokes of a planner in operating the TPS. A strategy to autopilot Eclipse VMAT/IMRT plan selection process is developed as a specific example of the proposed “scripting” method. The autopiloted planning is navigated by a decision function constructed with a reference plan that has the same prescription and similar anatomy with the case at hand. The calculation proceeds by alternating between the Eclipse optimization and the outer‐loop optimization independent of the Eclipse. In the C# program, the dosimetric characteristics of a reference treatment plan are used to assess and modify the Eclipse planning parameters and to guide the search for a clinically sensible treatment plan. The approach is applied to plan a head and neck (HN) VMAT case and a prostate IMRT case. Our study demonstrated the feasibility of application programming method in C# environment with recorded interactions of planner‐TPS. The process mimics a planner's planning process and automatically provides clinically sensible treatment plans that would otherwise require a large amount of manual trial and error of a planner. The proposed technique enables us to harness a commercial TPS by application programming via the use of recorded human computer interactions and provides an effective tool to greatly facilitate the treatment planning process. PACS number(s): 87.55.D‐, 87.55.kd, 87.55.de PMID:27929493

  5. 7 CFR 1948.82 - Plan and State Investment Strategy approval procedure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) RURAL DEVELOPMENT Section 601 Energy Impacted Area Development Assistance Program § 1948.82 Plan and State Investment Strategy approval... the plan; (3) A brief description of the socio-economic impacts that have occurred during the two most...

  6. Marketing and Distributive Education Curriculum Planning Guide.

    ERIC Educational Resources Information Center

    Northern Illinois Univ., DeKalb. Dept. of Business Education and Administration Services.

    This planning guide in marketing and distributive education is designed to provide the curriculum coordinator and instructor with a basis for planning a comprehensive program in the career field of marketing. Such programs require competencies in sales, sales promotion, buying, transporting, storing, financing, marketing research, and management.…

  7. Population Growth: Family Planning Programs.

    ERIC Educational Resources Information Center

    Doberenz, Alexander R., Ed.; Taylor, N. Burwell G., Ed.

    These proceedings of the second annual symposium on population growth bring together speeches and panel discussions on family planning programs. Titles of speeches delivered are: Communicating Family Planning (Mrs. Jean Hutchinson); Effects of New York's Abortion Law Change (Dr. Walter Rogers); The Law and Birth Control, Sterilization and Abortion…

  8. 45 CFR 98.14 - Plan process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Department of Health and Human Services GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...

  9. 45 CFR 98.14 - Plan process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...

  10. 45 CFR 98.14 - Plan process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...

  11. 45 CFR 98.14 - Plan process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...

  12. 45 CFR 98.14 - Plan process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...

  13. DEVELOPMENT OF A CORE COMBUSTION RESEARCH PROGRAM PLAN FOR EPA

    EPA Science Inventory

    The report described a plan, evolving from a review of the state- of-the-art in combustion research, for a long- term research program in combustion and thermal destruction. trawman plan was prepared and reviewed by a panel of representatives from industry, academia, and governme...

  14. 11 CFR 114.11 - Employee participation plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... participation plan (i.e. a trustee plan) which is a political giving program in which a corporation pays the..., over contributions by participants in the program to any candidate, group of candidates, political... including members of a labor organization who are employees of the corporation. Communications about...

  15. Planning and Implementing Immunization Billing Programs at State and Local Health Departments: Barriers and Possible Solutions.

    PubMed

    Corriero, Rosemary; Redmon, Ginger

    Before participating in a project funded by the Centers for Disease Control and Prevention, most state and local health departments (LHDs) were not seeking reimbursement or being fully reimbursed by insurance plans for the cost of immunization services (including vaccine costs and administration fees) they provided to insured patients. Centers for Disease Control and Prevention's Billables Project was designed to enable state and LHDs to bill public and private insurance plans for immunization services provided to insured patients. Identify and describe key barriers state and LHDs may encounter while planning and implementing a billing program, as well as possible solutions for overcoming those barriers. This study used reports from Billables Project participants to explore barriers they encountered when planning and implementing a billing program and steps taken to address those barriers. Thirty-eight state immunization programs. Based on project participants' reports, barriers were noted in 7 categories: (1) funding and costs, (2) staff, (3) health department characteristics, (4) third-party payers and insurance plans, (5) software, (6) patient insurance status, and (7) other barriers. Possible solutions for overcoming those barriers included hiring or seeking external help, creating billing guides and training modules, streamlining workflows, and modifying existing software systems. Overcoming barriers during planning and implementation of a billing program can be challenging for state and LHDs, but the experiences and suggestions of past Billables Project participants can help guide future billing program efforts.

  16. Marketing Program: Tripler Army Medical Center, Hawaii

    DTIC Science & Technology

    1990-12-01

    advertising agency. Good deeds are only effective when accompanied by good words. Thp qrimarv bEnefit of r P-,essful marketing program are improved...professional advertising agency. Good deeds are only effective when accompanied by good words. The primary benefits of a successful marketing program are... market plan itself. MARKET PLAN A market plan is not just advertising and gimmicks. It is only of value if it is a means of assisting people to satisfy

  17. The 25 kW power module evolution study. Part 3: Conceptual designs for power module evolution. Volume 2: Program plans

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A plan is presented for the evolutionary development and deployment of the power module system with performance capabilities required to support the 1983 to 1990 user requirements. Aspects summarized include program functional, operational, and hardware elements; program work breakdown and specification items; development plans and schedules for developmental and technology milestones; test concepts and timeliness; and ground and orbit operations concepts.

  18. NASA science utilization plans for the Space Station.

    PubMed

    Reeves, E M; Cressy, P J

    1995-10-01

    The Mir-1 and International Space Station Alpha capabilities present the science community with unique long duration platforms to conduct a wide range of scientific research in the microgravity and life sciences as well as in the observational sciences, NASA is developing plans to use the capabilities of Mir and Space Station as they emerge during the development of the orbital program. In both cases the planned science utilization programs take advantage of the volume, crew, power, microgravity and logistics resupply unique to each phase. The paper will present these utilization plans in the context of an evolving scientific program.

  19. Manned space flight nuclear system safety. Volume 6: Space base nuclear system safety plan

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A qualitative identification of the steps required to assure the incorporation of radiological system safety principles and objectives into all phases of a manned space base program are presented. Specific areas of emphasis include: (1) radiological program management, (2) nuclear system safety plan implementation, (3) impact on program, and (4) summary of the key operation and design guidelines and requirements. The plan clearly indicates the necessity of considering and implementing radiological system safety recommendations as early as possible in the development cycle to assure maximum safety and minimize the impact on design and mission plans.

  20. Surface Water Quality-Assurance Plan for the North Florida Program Office of the U.S. Geological Survey

    USGS Publications Warehouse

    Franklin, Marvin A.

    2000-01-01

    The U.S. Geological Survey, Water Resources Division, has a policy that requires each District office to prepare a Surface Water Quality-Assurance Plan. The plan for each District describes the policies and procedures that ensure high quality in the collection, processing, analysis, computer storage, and publication of surface-water data. The North Florida Program Office Surface Water Quality-Assurance Plan documents the standards, policies, and procedures used by the North Florida Program office for activities related to the collection, processing, storage, analysis, and publication of surface-water data.

Top