Sample records for program plan phase

  1. Logistics planning for phased programs.

    NASA Technical Reports Server (NTRS)

    Cook, W. H.

    1973-01-01

    It is pointed out that the proper and early integration of logistics planning into the phased program planning process will drastically reduce these logistics costs. Phased project planning is a phased approach to the planning, approval, and conduct of major research and development activity. A progressive build-up of knowledge of all aspects of the program is provided. Elements of logistics are discussed together with aspects of integrated logistics support, logistics program planning, and logistics activities for phased programs. Continuing logistics support can only be assured if there is a comprehensive sequential listing of all logistics activities tied to the program schedule and a real-time inventory of assets.

  2. Phase C/D program development plan. Volume 1: Program plan

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.

  3. Space station MSFC-DPD-235/DR no. MA-05 phase C/D program development plan. Volume 2: Phase C/D, programmatic requirements

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The design plan requirements define the design implementation and control requirements for Phase C/D of the Modular Space Station Project and specifically address the Initial Space Station phase of the Space Station Program (modular). It is based primarily on the specific objective of translating the requirements of the Space Station Program, Project, Interface, and Support Requirements and preliminary contract end x item specifications into detail design of the operational systems which comprise the initial space station. This document is designed to guide aerospace contractors in the planning and bidding for Phase C/D.

  4. 77 FR 33498 - Joint Industry Plans; Order Approving, on a Pilot Basis, the National Market System Plan To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-06

    ... pilot program, which was implemented through a series of rule filings by the Exchanges and FINRA. This... as a one-year pilot program in two Phases. Phase I of the Plan would be implemented immediately...

  5. Sundstrand’s Precision Metal Forming Cell. Industrial Modernization Incentive Program (IMIP). Phase 2

    DTIC Science & Technology

    1991-03-01

    1-2 1.4 CONCLUSIONS AND RECOMMENDATIONS ....................... 1-2 20. PHASE II MANAGEMENT PLAN...2-1 2.1 PROGRAM MANAGEMENT ................................... 2-1 2.2 IM IP TEAM...Barbier, reference Section 2.0 (Phase II Management Plan), is complete and this report provides the results of the Phase II study. 1.2 OBJECTIVES The

  6. A PLAN FOR EXPANSION AND DEVELOPMENT OF EDUCATION DEPARTMENTS OF FLORIDA DIVISION OF CORRECTIONS, IN COOPERATION WITH FLORIDA STATE UNIVERSITY ADULT EDUCATION DEPARTMENT.

    ERIC Educational Resources Information Center

    ENDWRIGHT, D.K.

    THE PLAN FOR EXPANSION AND DEVELOPMENT OF EDUCATION PROGRAMS IN CORRECTIVE INSTITUTIONS IS ORGANIZED INTO FIVE TIMED PHASES TO BE COMPLETED IN THREE YEARS. A CHART REPRESENTING THE PROGRAM, AFFILIATED RESEARCH AND AGENCIES DELINEATES PLANNED ACTIVITIES. PHASE ONE (15 WEEKS) WILL SURVEY EXISTING PROGRAMS (VOCATIONAL AND ACADEMIC FACILITIES,…

  7. JWST Operations and the Phase I and II Process

    NASA Astrophysics Data System (ADS)

    Beck, Tracy L.

    2010-07-01

    The JWST operations and Phase I and Phase II process will build upon our knowledge on the current system in use for HST. The primary observing overheads associated with JWST observations, both direct and indirect, are summarized. While some key operations constraints for JWST may cause deviations from the HST model for proposal planning, the overall interface to JWST planning will use the APT and will appear similar to the HST interface. The requirement is to have a proposal planning model simlar to HST, where proposals submitted to the TAC must have at least the minimum amount of information necessary for assessment of the strength of the science. However, a goal of the JWST planning process is to have the submitted Phase I proposal in executable form, and as complete as possible for many programs. JWST will have significant constraints on the spacecraft pointing and orient, so it is beneficial for the planning process to have these scheduling constraints on programs defined as early as possible. The guide field of JWST is also much smaller than the HST guide field, so searches for available guide stars for JWST science programs must be done at the Phase I deadline. The long range observing plan for each JWST cycle will be generated intially from the TAC accepted programs at the Phase I deadline, and the LRP will be refined after the Phase II deadline when all scheduling constraints are defined.

  8. Shuttle free-flying teleoperator system experiment definition. Volume 3: program development requirements

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The planning data are presented for subsequent phases of free-flying teleoperator program (FFTO) and includes costs, schedules and supporting research and technology activities required to implement the free-flying teleoperator system and associated flight equipment. The purpose of the data presented is to provide NASA with the information needed to continue development of the FFTO and integrate it into the space shuttle program. The planning data describes three major program phases consisting of activities and events scheduled to effect integrated design, development, fabrication and operation of an FFTO system. Phase A, Concept Generation, represents a study effort directed toward generating and evaluating a number of feasible FFTO experiment system concepts. Phase B, Definition, will include preliminary design and supporting analysis of the FFTO, the shuttle based equipment and ground support equipment. Phase C/D, Design, Development and Operations will include detail design of the operational FFTO, its integration into the space shuttle, hardware fabrication and testing, delivery of flight hardware and support of flight operations. Emphasis is placed on the planning for Phases A and B since these studies will be implemented early in the development cycle. Phase C/D planning is more general and subject to refinement during the definition phase.

  9. Planned Closeout of the Cf-252 Loan/Lease Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sherman, Steven R; Patton, Bradley D

    2012-09-01

    New funding is sought to pursue planned closeout of the Cf-252 Loan Program. The work will be performed in phases. In the initial phase, users will be surveyed to determine whether they wish to take ownership of sources in their possession, or return them. In the second phase, sources will be recalled from non-DOE entities, and source ownership transfers will be performed. In the third phase, the remaining sources from DOE entities will be recalled. Initial funding of $350K is sought to fund the first phase, and to plan execution of the remaining phases given information collected from user surveys.

  10. Personal transportation plan pilot program phase 1 : exploring the transportation behaviors and needs of veterans and people with physical disabilities and mobility constraints.

    DOT National Transportation Integrated Search

    2017-06-01

    This report summarizes the initial phase of the Personal Transportation Plan Pilot Program (PTP3). The purpose of the PTP3 initiative is to develop a personal transportation planning tool that can be used by disabled Vermonters and Vermont veterans t...

  11. Connected Vehicle Pilot Deployment Program phase 1 : performance measurement and evaluation support plan : Tampa (THEA) : final report.

    DOT National Transportation Integrated Search

    2016-03-14

    The Performance Measurement and Evaluation Support Plan for the Connected Vehicle Pilot Deployment Program Phase 1, Tampa Hillsborough Expressway Authority, outlines the goals and objectives for the Pilot as well as the proposed performance metrics. ...

  12. A Guide to Program Planning Vol. II.

    ERIC Educational Resources Information Center

    Allen, Earl, Sr.

    This booklet is a simplified guide for program planning and is intended to complement a somewhat lengthier companion booklet on program evaluation. It spells out in outline fashion the basic elements and steps involved in the planning process. Brief sections focus in turn on different phases of the planning process, including problem…

  13. 40 CFR 76.8 - Early election for Group 1, Phase II boilers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.8 Early election for Group 1... plan and: (i) If a Phase I Acid Rain permit governing the source at which the unit is located has been... chapter to include the early election plan; or (ii) If a Phase I Acid Rain permit governing the source at...

  14. 40 CFR 76.8 - Early election for Group 1, Phase II boilers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.8 Early election for Group 1... plan and: (i) If a Phase I Acid Rain permit governing the source at which the unit is located has been... chapter to include the early election plan; or (ii) If a Phase I Acid Rain permit governing the source at...

  15. 40 CFR 76.8 - Early election for Group 1, Phase II boilers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.8 Early election for Group 1... plan and: (i) If a Phase I Acid Rain permit governing the source at which the unit is located has been... chapter to include the early election plan; or (ii) If a Phase I Acid Rain permit governing the source at...

  16. 40 CFR 76.8 - Early election for Group 1, Phase II boilers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.8 Early election for Group 1... plan and: (i) If a Phase I Acid Rain permit governing the source at which the unit is located has been... chapter to include the early election plan; or (ii) If a Phase I Acid Rain permit governing the source at...

  17. 40 CFR 76.8 - Early election for Group 1, Phase II boilers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.8 Early election for Group 1... plan and: (i) If a Phase I Acid Rain permit governing the source at which the unit is located has been... chapter to include the early election plan; or (ii) If a Phase I Acid Rain permit governing the source at...

  18. Space Station - An integrated approach to operational logistics support

    NASA Technical Reports Server (NTRS)

    Hosmer, G. J.

    1986-01-01

    Development of an efficient and cost effective operational logistics system for the Space Station will require logistics planning early in the program's design and development phase. This paper will focus on Integrated Logistics Support (ILS) Program techniques and their application to the Space Station program design, production and deployment phases to assure the development of an effective and cost efficient operational logistics system. The paper will provide the methodology and time-phased programmatic steps required to establish a Space Station ILS Program that will provide an operational logistics system based on planned Space Station program logistics support.

  19. 23 CFR 450.224 - Phase-in of new requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Phase-in of new requirements. 450.224 Section 450.224 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.224 Phase-in of new...

  20. 23 CFR 450.338 - Phase-in of new requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Phase-in of new requirements. 450.338 Section 450.338 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.338 Phase-in of new...

  1. 23 CFR 450.224 - Phase-in of new requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Phase-in of new requirements. 450.224 Section 450.224 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.224 Phase-in of new...

  2. 23 CFR 450.338 - Phase-in of new requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Phase-in of new requirements. 450.338 Section 450.338 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.338 Phase-in of new...

  3. 23 CFR 450.224 - Phase-in of new requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Phase-in of new requirements. 450.224 Section 450.224 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.224 Phase-in of new...

  4. 23 CFR 450.338 - Phase-in of new requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Phase-in of new requirements. 450.338 Section 450.338 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.338 Phase-in of new...

  5. 23 CFR 450.338 - Phase-in of new requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Phase-in of new requirements. 450.338 Section 450.338 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.338 Phase-in of new...

  6. 23 CFR 450.224 - Phase-in of new requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Phase-in of new requirements. 450.224 Section 450.224 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.224 Phase-in of new...

  7. Influence of PPB on Capital Budgeting.

    ERIC Educational Resources Information Center

    Ellis, Arthur E.

    This talk is divided into two parts: Part one covers Planning, Programming and Budgeting for Capital Programs. Part two is a brief description of the Coho Salmon Program and how Program Planning and Budgeting in both the operation program and the capital phase was used to develop the Salmon Fishing Industry in Michigan. The planning process…

  8. CMIF ECLS system test findings

    NASA Technical Reports Server (NTRS)

    Schunk, Richard G.; Carrasquillo, Robyn L.; Ogle, Kathyrn Y.; Wieland, Paul O.; Bagdigian, Robert M.

    1989-01-01

    During 1987 three Space Station integrated Environmental Control and Life Support System (ECLSS) tests were conducted at the Marshall Space Flight Center (MSFC) Core Module Integration Facility (CMIF) as part of the MSFC ECLSS Phase II test program. The three tests ranged in duration from 50 to 150 hours and were conducted inside of the CMIF module simulator. The Phase II partial integrated system test configuration consisted of four regenerative air revitalization subsystems and one regenerative water reclamation subsystem. This paper contains a discussion of results and lessons learned from the Phase II test program. The design of the Phase II test configuration and improvements made throughout the program are detailed. Future plans for the MSFC CMIF test program are provided, including an overview of planned improvements for the Phase III program.

  9. Scheduling language and algorithm development study. Volume 2, phase 2: Introduction to plans programming. [user guide

    NASA Technical Reports Server (NTRS)

    Cochran, D. R.; Ishikawa, M. K.; Paulson, R. E.; Ramsey, H. R.

    1975-01-01

    A user guide for the Programming Language for Allocation and Network Scheduling (PLANS) is presented. Information is included for the construction of PLANS programs. The basic philosophy of PLANS is discussed, and access and update reference techniques are described along with the use of tree structures.

  10. Outdoor Education - A Guide to Site Planning and Implementation of Programs.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin. Div. of Curriculum Development.

    This booklet presents guidelines for initiating outdoor instructional programs. Initially, the guide lists the objectives of outdoor education: survival, recreation, development of personal health and well-being, career opportunities, and social adjustment. A discussion follows on the three phases of site planning. The first phase is site analysis…

  11. Multivariate areal analysis of the impact and efficiency of the family planning programme in peninsular Malaysia.

    PubMed

    Tan Boon Ann

    1987-06-01

    The findings of the final phase of a 3-phase multivariate areal analysis study undertaken by the Economic and Social Commission for Asia and the Pacific (ESCAP) in 5 countries of the Asian and Pacific Region, including Malaysia, to examine the impact of family planning programs on fertility and reproduction are reported. The study used Malaysia's administrative district as the unit of analysis because the administration and implementation of socioeconomic development activities, as well as the family planning program, depend to a large extent on the decisions of local organizations at the district or state level. In phase 1, existing program and nonprogram data were analyzed using the multivariate technique to separate the impact of the family planning program net of other developmental efforts. The methodology in the 2nd phase consisted of in-depth investigation of selected areas in order to discern the dynamics and determinants of efficiency. The insights gained in phase 2 regarding dynamics of performance were used in phase 3 to refine the input variables of the phase 1 model. Thereafter, the phase 1 analysis was repeated. Insignificant variables and factors were trimmed in order to present a simplified model for studying the impact of environmental, socioeconomic development, family planning programs, and related factors on fertility. The inclusion of a set of family planning program and development variables in phase 3 increased the predictive power of the impact model. THe explained variance for total fertility rate (TFR) of women under 30 years increased from 71% in phase 1 to 79%. It also raised the explained variance of the efficiency model from 34% to 70%. For women age 30 years and older, their TFR was affected directly by the ethnic composition variable (.76), secondary educational status (-.45), and modern nonagricultural occupation (.42), among others. When controlled for other socioeconomic development and environmental indicators, the nonagricultural activities had a positive direct effect on TFR. No direct effects were found to come from other socioeconomic development indicators, once these factors were controlled. The 3 factors that had direct effects on the fertility of women below age 30 were ethnic composition (.33), contraceptive pevalence (-.32), and secondary educational status (-.25). Other family planning program variables (contraceptive knowledge) and socioeconomic development indicators (exposure to modernization as measured by television ownership and health/living conditions as measured by infant mortality rate) affected fertility significantly but indirectly.

  12. Atmosphere, Magnetosphere and Plasmas in Space (AMPS). Spacelab payload definition study. Volume 7, book 2: AMPS phase C/D analysis and planning document

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The results are presented of the AMPS Phase C/D (Design, Development, and Operations) program analysis and planning effort. Cost and schedule estimates are included. Although the AMPS program has been specifically addressed, these task descriptions are basically adaptable to a broader-based program incorporating additional or different Spacelab/orbiter payloads.

  13. Connected Vehicle Pilot Deployment Program phase 1 : comprehensive deployment plan : New York City : volume 1 : technical application : part I : technical and management approach.

    DOT National Transportation Integrated Search

    2016-08-01

    This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...

  14. A Reliability Simulator for Radiation-Hard Microelectronics Development

    DTIC Science & Technology

    1991-07-01

    1 3.0 PHASE II WORK PLANS ................................................................ 2... plan . The correlation experimental details including the devices utilized, the hot-carrier stressing and the wafer-level radiation correlation procedure...channel devices, and a new lifetime extrapolation method is demonstrated for p-channel devices. 3.0 PHASE II WORK PLANS The Phase 1I program consisted of

  15. Detailed Test Plan Redundant Sensor Strapdown IMU Evaluation Program

    NASA Technical Reports Server (NTRS)

    Hartwell, T.; Miyatake, Y.; Wedekind, D. E.

    1971-01-01

    The test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The subjects discussed are: (1) test philosophy and limitations, (2) test sequence, (3) equipment specifications, (4) general operating procedures, (5) calibration procedures, (6) alignment test phase, and (7) navigation test phase. The data and analysis requirements are analyzed.

  16. A Personal Computer-Based Head-Spine Model

    DTIC Science & Technology

    1998-09-01

    the CHSM. CHSM was comprised of the pelvis, the thoracolumbar spine, a single beam representation of the cervical spine, the head, the rib cage , and...developing the private sector HSM-PC project follows the Phase II program Work Plan , but continues into a Phase m SBIR program internally funded by...on completing the head and neck portion of HSM-PC, which as described in the Confidence Assessment Plan (CA Plan ) will be known as the Head Cervical

  17. Solar power satellite system definition study, phase 2.

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A program plan for the Solar Power Satellite Program is presented. The plan includes research, development, and evaluation phase, engineering and development and cost verification phase, prototype construction, and commercialization. Cost estimates and task requirements are given for the following technology areas: (1) solar arrays; (2) thermal engines and thermal systems; (3) power transmission (to earth); (4) large space structures; (5) materials technology; (6) system control; (7) space construction; (8) space transportation; (9) power distribution, and space environment effects.

  18. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1994-02-01

    This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmonmore » recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.« less

  19. Hood River and Pelton Ladder Evaluation Studies : Annual Report 1994.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olsen, Erik A.; French, Rod A.; Ritchey, Alan D.

    1995-09-01

    In 1992, the Northwest Power Planning Council approved the Hood River and Pelton ladder master plans within the framework of the Columbia River Basin Fish and Wildlife Program. The master plans define an approach for implementing a hatchery supplementation program in the Hood River subbasin. The hatchery program as defined in the master plans is called the Hood River Hatchery Production Program (HRPP). The HRPP will be phased in over several years and will be jointly implemented by the Oregon Department of Fish and Wildlife (ODFW) and the Confederated Tribes of the Warm Springs (CTWS) Reservation. In December 1991, amore » monitoring and evaluation program was implemented in the Hood River subbasin to collect life history and production information on stocks of anadromous salmonids returning to the Hood River subbasin. The program was implemented to provide the baseline information needed to: (1) evaluate various management options for implementing the HRPP and (2) determine any post-project impacts the HRPP has on indigenous populations of resident fish. Information collected during the 1992-94 fiscal years will also be used to prepare an environmental impact statement (EIS) evaluating the program`s impact on the human environment. To begin construction on project facilities, it was proposed that the HRPP be implemented in two phases. Phase I would include work that would fall under a {open_quotes}categorical exclusion{close_quotes} from NEPA, and Phase II would include work requiring an EIS prior to implementation. This report summarizes the life history and escapement data collected in the Hood River subbasin and the status work of implemented under Phase I of the HR Life history and escapement data will be used to: (1) test the assumptions on which harvest and escapement goals for the Hood River and Pelton ladder master plans are based and (2) develop biologically based management recommendations for implementing the HRPP.« less

  20. 41 CFR 101-26.506 - Interior planning and design services.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Interior planning and...

  1. Tug fleet and ground operations schedules and controls. Volume 2: part 1

    NASA Technical Reports Server (NTRS)

    1975-01-01

    This Tug Fleet and Ground Operations Schedules and Controls Study addresses both ground operational data and technical requirements that span the Tug planning phase and operations phase. A similar study covering mission operations (by others) provides the complimentary flight operations details. The two studies provide the planning data requirements, resource allocation, and control milestones for supporting the requirements of the STS program. This Tug Fleet and Ground Operations Schedules and Controls Study incorporates the basic ground operations requirements and concepts provided by previous studies with the interrelationships of the planning, IUS transition, and Tug fleet operations phases. The interrelationships of these phases were studied as a system to optimize overall program benefits and minimize operational risk factors.

  2. A faculty created strategic plan for excellence in nursing education.

    PubMed

    Evans, Connie Joan; Francis Shackell, Eileen; Jean Kerr-Wilson, Selma; Joan Doyle, Glynda; McCutcheon, Jodie Anita; Budz, Bernice

    2014-02-08

    Strategic planning for nursing education, when seen through a faculty lens creates a deeper, more meaningful critical analysis of effective program development. New strategies are required for academic institutions to transform their curricula to meet the needs of a dynamic healthcare and changing global environment to provide quality education for students. In this article, an evidence-informed process is presented that was progressively co-created by the faculty and facilitators. Seminal business frameworks, leadership development philosophies, and innovative interventions enabled faculty to become engaged and developed as they created a strategic plan for a future-driven nursing program. Phase One presents the process of developing a strategic plan for excellence in nursing education by leveraging faculty potential and preparing for an upcoming accreditation. In Phase Two, four team members from Phase One continue as part of Phase Two team serving as the collective memory for this initial work. This method of strategic planning encouraged faculty engagement and leadership and laid the groundwork for a positive culture change among nursing faculty.

  3. Reading Treasures. Phase I and Phase II.

    ERIC Educational Resources Information Center

    Kansas State Dept. of Education, Topeka.

    Based on the premise that a school reading program must focus on the learner and the text, this guidebook is designed to serve as a resource for school districts, groups, or individuals involved in planning, implementing, and evaluating reading programs. The guidebook is divided into two phases. Phase 1, "Guidelines for Developing and…

  4. A Strategic Planning Process Model for Distance Education

    ERIC Educational Resources Information Center

    Pisel, Kenneth P.

    2008-01-01

    As more institutions seek to implement or expand distance learning programs, it becomes critical to integrate distance learning programs into broader strategic visions and plans. Using the informed opinion from a panel of peer-nominated experts via iterative Delphi questionnaires, a 10-phased strategic planning process model for distance education…

  5. South Bay Salt Pond Tidal Wetland Restoration Phase II Planning

    EPA Pesticide Factsheets

    Information about the SFBWQP South Bay Salt Pond Tidal Wetland Restoration Phase II Planning project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic re

  6. Planning Evaluation through the Program Life Cycle

    ERIC Educational Resources Information Center

    Scheirer, Mary Ann; Mark, Melvin M.; Brooks, Ariana; Grob, George F.; Chapel, Thomas J.; Geisz, Mary; McKaughan, Molly; Leviton, Laura

    2012-01-01

    Linking evaluation methods to the several phases of a program's life cycle can provide evaluation planners and funders with guidance about what types of evaluation are most appropriate over the trajectory of social and educational programs and other interventions. If methods are matched to the needs of program phases, evaluation can and should…

  7. Modular space station, phase B extension. Program operations plan

    NASA Technical Reports Server (NTRS)

    1971-01-01

    An organized approach is defined for establishing the most significant requirements pertaining to mission operations, information management, and computer program design and development for the modular space station program. The operations plan pertains to the space station and experiment module program elements and to the ground elements required for mission management and mission support operations.

  8. Study of solid rocket motors for a space shuttle booster. Volume 3: Program acquisition planning

    NASA Technical Reports Server (NTRS)

    Vonderesch, A. H.

    1972-01-01

    Plans for conducting Phase C/D for a solid rocket motor booster vehicle are presented. Methods for conducting this program with details of scheduling, testing, and program management and control are included. The requirements of the space shuttle program to deliver a minimum cost/maximum reliability booster vehicle are examined.

  9. 41 CFR 101-26.506 - Interior planning and design services.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...

  10. 41 CFR 101-26.506 - Interior planning and design services.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...

  11. 41 CFR 101-26.506 - Interior planning and design services.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...

  12. 41 CFR 101-26.506 - Interior planning and design services.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...

  13. Trans-Pacific HDR Satellite Communications Experiment Phase-2 Project Plan and Experimental Network

    NASA Technical Reports Server (NTRS)

    Hsu, Eddie; Kadowaki, Naoto; Yoshimura, Naoko; Takahashi, Takashi; Yoshikawa, Makoto; Bergman, Larry; Bhasin, Kul

    2000-01-01

    The trans-Pacific high data rate (TP-HDR) satellite communications experiment was proposed at the Japan-U.S. Cooperation in Space (JUCS) Program Workshop held in Hawaii in 1993 and remote high definition video post-production was demonstrated as the first phase trial. ATM-based 45 Mbps trans-Pacific link was established in the first phase, and the following experiments with 155 Mbps was planned as the phase 2. This paper describes the experimental network configuration and project plan of TP-HDR experiment phase 2. Additional information is provided in the original.

  14. The Annual Report of the National Shipbuilding Research Program (The Naval Shipbuilding Research Program)

    DTIC Science & Technology

    1986-08-29

    Abrasives Work Planning for Shipyard SP&C Training Overcoating of Zinc Primers Citric Acid Cleaning - Phase II - Waterborne Coatings Economics of...members workout organizational problems with minimum government involvement a set of strong, committed, and sometimes fiercely independent panels and...01 Manual of Welding Planning and Design Guidelines - Phase III PANEL SP-3 Ship Design Considerations: Adaptation of Japanese Pre - 7 9 79 81 82 83 83

  15. Developing an interdisciplinary certificate program in transportation planning, phase 2 : the eCertificate.

    DOT National Transportation Integrated Search

    2011-11-01

    This proposal extends the delivery of the recently developed graduate Certificate in Transportation : Planning to a wider audience through the establishment of an Executive Certificate Program by distance : (eCertificate). While the need for an inter...

  16. The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan

    NASA Technical Reports Server (NTRS)

    Bronstein, L.; Kawamoto, Y.; Riberich, J. J.; Scope, J. R.; Forman, B. J.; Bergman, S. G.; Reisenfeld, S.

    1981-01-01

    The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.

  17. Atmospheric, Magnetospheric and Plasmas in Space (AMPS) spacelab payload definition study - program analysis and planning for phase C/D document - Volume 7

    NASA Technical Reports Server (NTRS)

    Keeley, J. T.

    1976-01-01

    Typical missions identified for AMPS flights in the arly 1980's are described. Experiment objectives and typical scientific instruments selected to accomplish these objectives are discussed along with mission requirements and shuttle and Spacelab capabilities assessed to determine any AMPS unique requirements. Preliminary design concepts for the first two AMPS flights form the basis for the Phase C/D program plan. This plan implements flights 1 and 2 and indicates how both the scientific and flight support hardware can be systematically evolved for future AMPS flights.

  18. Trans-Pacific HDR Satellite Communications Experiment Phase-2: Experimental Network and Demonstration Plan

    NASA Technical Reports Server (NTRS)

    Kadowaki, Naoto; Yoshimura, Naoko; Takahashi, Takashi; Yoshikawa, Makoto; Hsu, Eddie; Bergman, Larry; Bhasin, Kul; Gary, Pat

    1998-01-01

    The trans-Pacific high data rate (TP-HDR) satellite communications experiment was proposed at the Japan-U.S. Cooperation in Space (JUCS) Program Workshop held in Hawaii in 1993 and remote high definition video post-production was demonstrated as the first phase trial. Following the first phase, the second phase experiment is currently prepared. This paper describes the experimental network configuration, application demonstration, and performance evaluation plan of the second phase experiment.

  19. Case study: Use of isothiazolinone and nitro-morpholine biocides to control microbial contamination in diesel and gasoline storage and distribution systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chesneau, H.L.; Passman, F.J.; Daniels, D.

    1995-05-01

    Responding to feed-back from its retail outlet network, a major, vertically integrated petroleum company undertook to diagnose and remediate diesel and gasoline performance problems. Analysis of samples from tanks at refinery, distribution terminal and retail outlet sites established that uncontrolled microbial contamination was rampant throughout the distribution system. The company then developed and instituted a two-phase action plan. During Phase I, all tanks received corrective (shock) biocide treatment preceding mechanical tank cleaning and fuel polishing. An ongoing Phase II program currently includes routine sampling and analysis combined with periodic preventive biocide treatment. This paper describes the initial problem diagnosis, correctivemore » action plan and preventive program; recommending the Phase II program as a model for all companies involved with refining, distribution or retailing gasoline.« less

  20. International Union for Conservation of Nature and Natural Resources (IUCN) Bulletin, New Series Vol. 7, No. 12.

    ERIC Educational Resources Information Center

    International Union for Conservation of Nature and Natural Resources, Morges, (Switzerland).

    Described is the International Union for Conservation of Nature and Natural Resources (IUCN) marine program which centers around the world wildlife fund marine program. The program has been divided into three phases - launch, main, and follow-up; the launch phase is described. Action plans are described for each sub-program. Each action plan…

  1. A new DoD initiative: the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program

    NASA Astrophysics Data System (ADS)

    Arevalo, S.; Atwood, C.; Bell, P.; Blacker, T. D.; Dey, S.; Fisher, D.; Fisher, D. A.; Genalis, P.; Gorski, J.; Harris, A.; Hill, K.; Hurwitz, M.; Kendall, R. P.; Meakin, R. L.; Morton, S.; Moyer, E. T.; Post, D. E.; Strawn, R.; Veldhuizen, D. v.; Votta, L. G.; Wynn, S.; Zelinski, G.

    2008-07-01

    In FY2008, the U.S. Department of Defense (DoD) initiated the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program, a 360M program with a two-year planning phase and a ten-year execution phase. CREATE will develop and deploy three computational engineering tool sets for DoD acquisition programs to use to design aircraft, ships and radio-frequency antennas. The planning and execution of CREATE are based on the 'lessons learned' from case studies of large-scale computational science and engineering projects. The case studies stress the importance of a stable, close-knit development team; a focus on customer needs and requirements; verification and validation; flexible and agile planning, management, and development processes; risk management; realistic schedules and resource levels; balanced short- and long-term goals and deliverables; and stable, long-term support by the program sponsor. Since it began in FY2008, the CREATE program has built a team and project structure, developed requirements and begun validating them, identified candidate products, established initial connections with the acquisition programs, begun detailed project planning and development, and generated the initial collaboration infrastructure necessary for success by its multi-institutional, multidisciplinary teams.

  2. A comprehensive medical student career development program improves medical student satisfaction with career planning.

    PubMed

    Zink, Brian J; Hammoud, Maya M; Middleton, Eric; Moroney, Donney; Schigelone, Amy

    2007-01-01

    In 1999, the University of Michigan Medical School (UMMS) initiated a new career development program (CDP). The CDP incorporates the 4-phase career development model described by the Association of American Medical Colleges (AAMC) Careers in Medicine (CiM). The CDP offers self-assessment exercises with guidance from trained counselors for 1st- and 2nd-year medical students. Career exploration experiences include Career Seminar Series luncheons, shadow experiences with faculty, and a shadow program with second-year (M2) and fourth-year (M4) medical students. During the decision-making phase, students work with trained faculty career advisors (FCA). Mandatory sessions are held on career selection, preparing the residency application, interviewing, and program evaluation. During the implementation phase, students meet with deans or counselors to discuss residency application and matching. An "at-risk plan" assists students who may have difficulty matching. The CiM Web site is extensively used during the 4 stages. Data from the AAMC and UMMS Graduation Questionnaires (GQ) show significant improvements for UMMS students in overall satisfaction with career planning services and with faculty mentoring, career assessment activities, career information, and personnel availability. By 2003, UMMS students had significantly higher satisfaction in all measured areas of career planning services when compared with all other U.S. medical students.

  3. Configuration management plan for waste tank farms and the 242-A evaporator of tank waste remediation system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laney, T.

    The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less

  4. Connected vehicle pilot deployment program phase 1, deployment outreach plan -- New York City.

    DOT National Transportation Integrated Search

    2016-07-19

    This document is a high level plan that describes the Outreach Plan for the New York City Connected Vehicle Pilot Deployment. The plan defines the communications strategy for the CV Pilot Deployment; identifies roles and responsibilities of persons t...

  5. Modular space station phase B extension program master plan

    NASA Technical Reports Server (NTRS)

    Munsey, E. H.

    1971-01-01

    The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.

  6. Conference Model: Guidelines...for Science Supervisors on How to Conduct a Successful Leadership Conference.

    ERIC Educational Resources Information Center

    DeBlasi, Robert V.

    Guidelines of a four-phase model for conducting leadership conferences are outlined. Phase I focuses on initial conference planning, including (1) identifying need and purpose for the conference; (2) selecting a conference chairperson; (3) forming the conference planning committee, listing suggested committees and their responsibilities (program,…

  7. The CCC Institutional Development Program: Organizational Change from the Chief Executive's Perspective.

    ERIC Educational Resources Information Center

    Ellison, Nolen M.; Eadie, Douglas C.

    Cuyahoga Community College's three-phase Institutional Development Program (IDP) was established in January, 1975, to provide systematic and uniform college-wide planning and management procedures. This report first discusses the social forces which led the college to undertake the IDP; identifies the long-range planning, governance, and…

  8. Final Work Plan: Targeted Investigation at York, Nebraska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan,more » the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.« less

  9. Consortium for Planning, Developing, and Implementing Exploratory Industrial Career Development Models (Phase I of Three Phases). Interim Report.

    ERIC Educational Resources Information Center

    Oregon State Univ., Corvallis.

    The report describes the organizational phase of a project designed to create program models and supporting literature for exploratory industrial career development programs for grades seven to ten. The project was undertaken by Oregon State University in cooperation with the Oregon State Department of Education and involved the formation of a…

  10. Telecommunications Network Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1989-05-01

    The Office of Civilian Radioactive Waste Management (OCRWM) must, among other things, be equipped to readily produce, file, store, access, retrieve, and transfer a wide variety of technical and institutional data and information. The data and information regularly produced by members of the OCRWM Program supports, and will continue to support, a wide range of program activities. Some of the more important of these information communication-related activities include: supporting the preparation, submittal, and review of a license application to the Nuclear Regulatory Commission (NRC) to authorize the construction of a geologic repository; responding to requests for information from parties affectedmore » by and/or interested in the program; and providing evidence of compliance with all relevant Federal, State, local, and Indian Tribe regulations, statutes, and/or treaties. The OCRWM Telecommunications Network Plan (TNP) is intended to identify, as well as to present the current strategy for satisfying, the telecommunications requirements of the civilian radioactive waste management program. The TNP will set forth the plan for integrating OCRWM`s information resources among major program sites. Specifically, this plan will introduce a telecommunications network designed to establish communication linkages across the program`s Washington, DC; Chicago, Illinois; and Las Vegas, Nevada, sites. The linkages across these and associated sites will comprise Phase I of the proposed OCRWM telecommunications network. The second phase will focus on the modification and expansion of the Phase I network to fully accommodate access to the OCRWM Licensing Support System (LSS). The primary components of the proposed OCRWM telecommunications network include local area networks; extended local area networks; and remote extended (wide) area networks. 10 refs., 6 figs.« less

  11. NASA science utilization plans for the Space Station.

    PubMed

    Reeves, E M; Cressy, P J

    1995-10-01

    The Mir-1 and International Space Station Alpha capabilities present the science community with unique long duration platforms to conduct a wide range of scientific research in the microgravity and life sciences as well as in the observational sciences, NASA is developing plans to use the capabilities of Mir and Space Station as they emerge during the development of the orbital program. In both cases the planned science utilization programs take advantage of the volume, crew, power, microgravity and logistics resupply unique to each phase. The paper will present these utilization plans in the context of an evolving scientific program.

  12. Manned space flight nuclear system safety. Volume 6: Space base nuclear system safety plan

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A qualitative identification of the steps required to assure the incorporation of radiological system safety principles and objectives into all phases of a manned space base program are presented. Specific areas of emphasis include: (1) radiological program management, (2) nuclear system safety plan implementation, (3) impact on program, and (4) summary of the key operation and design guidelines and requirements. The plan clearly indicates the necessity of considering and implementing radiological system safety recommendations as early as possible in the development cycle to assure maximum safety and minimize the impact on design and mission plans.

  13. USL/DBMS NASA/PC R and D project system testing standards

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Kavi, Srinu; Moreau, Dennis R.; Yan, Lin

    1984-01-01

    A set of system testing standards to be used in the development of all C software within the NASA/PC Research and Development Project is established. Testing will be considered in two phases: the program testing phase and the system testing phase. The objective of these standards is to provide guidelines for the planning and conduct of program and software system testing.

  14. Design, fabrication, test, qualification and price analysis of third generation design solar cell modules. Part 1: Intermediate load module

    NASA Technical Reports Server (NTRS)

    Bottenberg, W. R.

    1981-01-01

    The updated program plan and narrative reflects the design and development work done and progress made in establishing a viable design for these modules. Design alterations from the preproduction plan are discussed based on experience gained during the preproduction phase of the program.

  15. Occupational Orientation: A Necessary Step in Educational and Vocational Planning

    ERIC Educational Resources Information Center

    Hemp, Paul E.; Walker, Robert W.

    1973-01-01

    Students who have participated in career exploration programs have often been undecided at the end of the program. The phase of the process where they must make an occupational choice is called occupational orientation. After this step plans can be developed for educational preparation for entry into the chosen field. (KP)

  16. Child saving and child spacing in Africa: the evolution of a concept.

    PubMed

    Wright, R D

    1973-01-01

    In 1963 neither the Nigerian Society of Health nor anyone in the power structure of Nigeria would publicly endorse family planning. By early 1968 a family planning day was declared where it was proclaimed that the quality of the people was important not the quantity. However Nigeria still does not have a family planning program that reaches a large percentage of the women at risk. The first phase is a quiet beginning, the second is the achievement of acceptance, the third is to train teachers, and the fourth phase is the establishment of maternal-child care services. This last phase may incorporate the family planning services. Is hoped that this will lead to a more favorable attitude toward family planning.

  17. A Novel Approach to Practice-Based Learning and Improvement Using a Web-Based Audit and Feedback Module.

    PubMed

    Boggan, Joel C; Cheely, George; Shah, Bimal R; Heffelfinger, Randy; Springall, Deanna; Thomas, Samantha M; Zaas, Aimee; Bae, Jonathan

    2014-09-01

    Systematically engaging residents in large programs in quality improvement (QI) is challenging. To coordinate a shared QI project in a large residency program using an online tool. A web-based QI tool guided residents through a 2-phase evaluation of performance of foot examinations in patients with diabetes. In phase 1, residents completed reviews of health records with online data entry. Residents were then presented with personal performance data relative to peers and were prompted to develop improvement plans. In phase 2, residents again reviewed personal performance. Rates of performance were compared at the program and clinic levels for each phase, with data presented for residents. Acceptability was measured by the number of residents completing each phase. Feasibility was measured by estimated faculty, programmer, and administrator time and costs. Seventy-nine of 86 eligible residents (92%) completed improvement plans and reviewed 1471 patients in phase 1, whereas 68 residents (79%) reviewed 1054 patient charts in phase 2. Rates of performance of examination increased significantly between phases (from 52% to 73% for complete examination, P < .001). Development of the tool required 130 hours of programmer time. Project analysis and management required 6 hours of administrator and faculty time monthly. An online tool developed and implemented for program-wide QI initiatives successfully engaged residents to participate in QI activities. Residents using this tool demonstrated improvement in a selected quality target. This tool could be adapted by other graduate medical education programs or for faculty development.

  18. Space Shuttle wind tunnel testing program

    NASA Technical Reports Server (NTRS)

    Whitnah, A. M.; Hillje, E. R.

    1984-01-01

    A major phase of the Space Shuttle Vehicle (SSV) Development Program was the acquisition of data through the space shuttle wind tunnel testing program. It became obvious that the large number of configuration/environment combinations would necessitate an extremely large wind tunnel testing program. To make the most efficient use of available test facilities and to assist the prime contractor for orbiter design and space shuttle vehicle integration, a unique management plan was devised for the design and development phase. The space shuttle program is reviewed together with the evolutional development of the shuttle configuration. The wind tunnel testing rationale and the associated test program management plan and its overall results is reviewed. Information is given for the various facilities and models used within this program. A unique posttest documentation procedure and a summary of the types of test per disciplines, per facility, and per model are presented with detailed listing of the posttest documentation.

  19. Risk management in international manned space program operations.

    PubMed

    Seastrom, J W; Peercy, R L; Johnson, G W; Sotnikov, B J; Brukhanov, N

    2004-02-01

    New, innovative joint safety policies and requirements were developed in support of the Shuttle/Mir program, which is the first phase of the International Space Station program. This work has resulted in a joint multinational analysis culminating in joint certification for mission readiness. For these planning and development efforts, each nation's risk programs and individual safety practices had to be integrated into a comprehensive and compatible system that reflects the joint nature of the endeavor. This paper highlights the major incremental steps involved in planning and program integration during development of the Shuttle/Mir program. It traces the transition from early development to operational status and highlights the valuable lessons learned that apply to the International Space Station program (Phase 2). Also examined are external and extraneous factors that affected mission operations and the corresponding solutions to ensure safe and effective Shuttle/Mir missions. c2003 Published by Elsevier Ltd.

  20. Space shuttle phase B study plan

    NASA Technical Reports Server (NTRS)

    Hello, B.

    1971-01-01

    Phase B emphasis was directed toward development of data which would facilitate selection of the booster concept, and main propulsion system for the orbiter. A shuttle system is also defined which will form the baseline for Phase C program activities.

  1. Space station experiment definition: Long-term cryogenic fluid storage

    NASA Technical Reports Server (NTRS)

    Jetley, R. L.; Scarlotti, R. D.

    1987-01-01

    The conceptual design of a space station Technology Development Mission (TDM) experiment to demonstrate and evaluate cryogenic fluid storage and transfer technologies is presented. The experiment will be deployed on the initial operational capability (IOC) space station for a four-year duration. It is modular in design, consisting of three phases to test the following technologies: passive thermal technologies (phase 1), fluid transfer (phase 2), and active refrigeration (phase 3). Use of existing hardware was a primary consideration throughout the design effort. A conceptual design of the experiment was completed, including configuration sketches, system schematics, equipment specifications, and space station resources and interface requirements. These requirements were entered into the NASA Space Station Mission Data Base. A program plan was developed defining a twelve-year development and flight plan. Program cost estimates are given.

  2. Connected Vehicle Pilot Deployment Program Phase 1, Participant Training and Stakeholder Education Plan – Tampa (THEA).

    DOT National Transportation Integrated Search

    2016-08-01

    The Participant Training and Stakeholder Education Plan is a high-level plan for the recruitment and training of all automobile drivers, pedestrians, transit drivers, traffic management center (TMC) operators, and installation and maintenance technic...

  3. Connected Vehicle Pilot Deployment Program Phase 2, Data Management Plan

    DOT National Transportation Integrated Search

    2017-10-17

    This document represents a data management plan that delineates all of the data types and data treatment throughout the New York City Connected Vehicle Pilot Deployment (NYC CVPD). This plan includes an identification of the New York City connected v...

  4. “Maternal Health and Family Planning Distance Education” experience among physicians: a three-phase study to determine the educational needs, develop education program, and evaluate efficacy of the education administered

    PubMed Central

    Ciftci, Bestami; Uzel, Nesibe; Ozel, M Onur; Zergeroglu, Sema; Deger, Cetin; Turasan, S Sare; Karakoc, Ayse Gul; Ozbalci, Semra

    2016-01-01

    Aim This study aims to assess the educational needs of family practitioners and evaluate the efficacy of the ongoing “Maternal Health and Family Planning Distance Education” program conducted by the General Directorate of Health Research (SAGEM) of the Turkish Ministry of Health. Methods This study consisted of three phases. In the first phase, an online survey on maternal health and family planning educational needs was sent to 20,611 physicians via e-mail. Of the 20,611 physicians, 4,729 completed the survey. In the second phase, of the 1,061 physicians registered to the education program, 632 physicians with active participation were included. In the third phase, the preeducation expectations of 287 physicians and posteducation satisfaction of 54 physicians were analyzed with a questionnaire. Results The majority of the physicians were employed in a family health center (97.4%) and practicing for 16–20 years (23.2%) without any prior in-service training (60.9%). High-to-very high educational need was expressed by 56.4% of physicians for pregnancy, delivery, and puerperality. Topics that the physicians, including both those with ≥16 years in practice and without prior in-service training, expressed need for more detailed content were pregnancy, delivery, and puerperality (37.5%); emergency obstetric approach in the primary care setting (33.1%); and gynecological infectious diseases and treatment approach (32.4%). Following the education program, the participants’ expectations were fulfilled in terms of refreshing their knowledge, particularly in the field of Maternal Health and Family Planning (87.1% and 75.9%) and the percentage of participants who expressed that they had sufficient high level knowledge increased from 55% to 68.5%. Conclusion The education on Maternal Health and Family Planning refreshed the knowledge of participants and highly met the preeducation expectations. Determining the educational needs and expectations of the target population prior to the education program seems to have an important role on determining its overall success. PMID:27354837

  5. "Maternal Health and Family Planning Distance Education" experience among physicians: a three-phase study to determine the educational needs, develop education program, and evaluate efficacy of the education administered.

    PubMed

    Ciftci, Bestami; Uzel, Nesibe; Ozel, M Onur; Zergeroglu, Sema; Deger, Cetin; Turasan, S Sare; Karakoc, Ayse Gul; Ozbalci, Semra

    2016-01-01

    This study aims to assess the educational needs of family practitioners and evaluate the efficacy of the ongoing "Maternal Health and Family Planning Distance Education" program conducted by the General Directorate of Health Research (SAGEM) of the Turkish Ministry of Health. This study consisted of three phases. In the first phase, an online survey on maternal health and family planning educational needs was sent to 20,611 physicians via e-mail. Of the 20,611 physicians, 4,729 completed the survey. In the second phase, of the 1,061 physicians registered to the education program, 632 physicians with active participation were included. In the third phase, the preeducation expectations of 287 physicians and posteducation satisfaction of 54 physicians were analyzed with a questionnaire. The majority of the physicians were employed in a family health center (97.4%) and practicing for 16-20 years (23.2%) without any prior in-service training (60.9%). High-to-very high educational need was expressed by 56.4% of physicians for pregnancy, delivery, and puerperality. Topics that the physicians, including both those with ≥16 years in practice and without prior in-service training, expressed need for more detailed content were pregnancy, delivery, and puerperality (37.5%); emergency obstetric approach in the primary care setting (33.1%); and gynecological infectious diseases and treatment approach (32.4%). Following the education program, the participants' expectations were fulfilled in terms of refreshing their knowledge, particularly in the field of Maternal Health and Family Planning (87.1% and 75.9%) and the percentage of participants who expressed that they had sufficient high level knowledge increased from 55% to 68.5%. The education on Maternal Health and Family Planning refreshed the knowledge of participants and highly met the preeducation expectations. Determining the educational needs and expectations of the target population prior to the education program seems to have an important role on determining its overall success.

  6. Study of CETA Plans and Reservation Economic Development. Executive Summary.

    ERIC Educational Resources Information Center

    Fazio, Ernest J., Jr.; Kelly, Patricia F.

    Field study and analysis of program documents were undertaken in the first phase of a multi-phased research effort to improve and strengthen the relationships between CETA programs and economic development activities on Indian reservations. Exploratory in nature, the study examined the approaches developed by 24 Indian reservations and Native…

  7. Fifteen-foot diameter modular space station Kennedy Space Center launch site support definition (space station program Phase B extension definition)

    NASA Technical Reports Server (NTRS)

    Bjorn, L. C.; Martin, M. L.; Murphy, C. W.; Niebla, J. F., V

    1971-01-01

    This document defines the facilities, equipment, and operational plans required to support the MSS Program at KSC. Included is an analysis of KSC operations, a definition of flow plans, facility utilization and modifications, test plans and concepts, activation, and tradeoff studies. Existing GSE and facilities that have a potential utilization are identified, and new items are defined where possible. The study concludes that the existing facilities are suitable for use in the space station program without major modification from the Saturn-Apollo configuration.

  8. Phase II -- Photovoltaics for Utility Scale Applications (PVUSA): Safety and health action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berg, K.

    1994-09-01

    To establish guidelines for the implementation and administration of an injury and illness prevention program for PVUSA and to assign specific responsibilities for the execution of the program. To provide a basic Safety and Health Action Plan (hereinafter referred to as Plan) that assists management, supervision, and project personnel in the recognition, evaluation, and control of hazardous activities and/or conditions within their respective areas of responsibility.

  9. [Development and evaluation of an educational program for promotion of healthy nutrition and physical activity by health volunteers].

    PubMed

    Yamaguchi, Yukio; Kai, Yuko; Kumamoto, Hiroko

    2009-12-01

    The purpose of the present trial was to develop and evaluate an educational program for promotion of healthy nutrition and physical activity by health volunteers. The educational program consisted of the following four phases: preliminary self-learning by mail (3 weeks), basic learning (3 sessions of 3 hours), practice of planned activities (2 months), and a report session (1 session of 3 hours). Beginner volunteers (n=18, mean age 63.3 +/- 6.4) were recruited from two volunteer health organizations in Kurume city. They then participated in a program that taught basic health knowledge regarding nutrition and physical activity, how to plan effective support activities, and methods for self-evaluation. In the preliminary self-learning phase, an assessment sheet, health information, and homework (goal setting, etc.) were delivered to the volunteers by mail. In the basic learning phase, volunteers attended a 3 day seminar on essential principles for behavioral change and assessment methods for volunteer activity. In addition, effective support activities were planned through group discussion. After a 2-month practice of support activities, each group reported and discussed the results of their activity in a 3-hour report session. Main outcome measures were health knowledge (15 items, 0-1 points), self-efficacy for life style support (5 items, 0-100%), and evaluation of the educational program (9 items, 1-5 points). All measures were self-administered. Significant increases in rate of true answers for health knowledge were observed during the preliminary self-learning and before basic learning phases (54.8% --> 67.1%, P < 0.05), and before and after basic learning phases (67.1% --> 87.6%, P < 0.05). Self-efficacy for life style support were significantly higher after the report session than before the preliminary self-learning phase (35.1% --> 53.1%, P < 0.05). In the two-month practice, all groups received feedback through questionnaires completed by participants who took part in their planned activity. The mean scores for the overall evaluation of the program, the effectiveness of the course materials and group-work, the staff, and the course contents were all higher than 4.0 points. These findings indicate that this program is structured effectively and is appropriate for educating beginner health volunteers regarding promotion of healthy nutrition and physical activity.

  10. B-70 Aircraft Study. Volume 1

    NASA Technical Reports Server (NTRS)

    Johnson, V. T.

    1972-01-01

    This Phase 2 final report for the B-70 aircraft study contains the data location matrix, which provides a summary of the major cost, schedule, and technical items provided in the report; work breakdown structure; cost definitions; and B-70 program level summary data. The Phase 2 objective was to provide the B-70 aircraft data in accordance with the approved study plan. Several minor modifications to the original plan have been made as the result of the Phase 2 effort.

  11. Partners in Progress: A Responsible Approach.

    ERIC Educational Resources Information Center

    Davis, Bob A.; Wallace, William H., Jr.

    1983-01-01

    The financial plan for the Alabama Space and Rocket Center's $16-million expansion program, including the recreational-educational complex, involved funding from state, city, county, regional, federal, and private sources. The plan's three phases encompass planning (including environmental impacts and necessary support items) and present and…

  12. Plan for the Class of 2000. Final Report of the Program Planning Committee.

    ERIC Educational Resources Information Center

    Wake Forest Univ., Winston Salem, NC.

    This report presents the comprehensive academic plan for undergraduate students to be phased in at Wake Forest University (North Carolina) beginning with the class entering in 1996. Four concepts are emphasized in the plan: (1) continued personalization and individualization of the professor-student relationship; (2) establishment of a first-year…

  13. TWRS Configuration management program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.

  14. E.E.C. 2000: A Study of Environmental Education Centers. Part I and Parts II & III.

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Natural Resources, St. Paul.

    This report of Environmental Education Centers (EECs) presents recommendations development of long range plans for the development and program coordination of EECs in Minnesota. The plan focuses on identifying programming needs, geographic areas to locate facilities, and capital costs for development and creation of a phased-in implementation…

  15. A Planning Framework for Crafting the Required-Curriculum Phase of an MBA Program

    ERIC Educational Resources Information Center

    Haskins, Mark E.

    2005-01-01

    This article introduces a planning framework for designing that part of an MBA program during which students take the bulk, if not all, of their required courses. The framework highlights three student venues that can be jointly leveraged for enhanced student learning. Those venues are the required curriculum, students' affinity groups, and the…

  16. Connected Vehicle Pilot Deployment Program phase 1 : application deployment plan : New York City : final application deployment plan.

    DOT National Transportation Integrated Search

    2016-08-04

    This document is the Task 7 Application Deployment Plan deliverable for the New York City Connected Vehicle Pilot Deployment. It describes the process that the deployment team will follow to acquire and test the connected vehicle safety applications....

  17. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  18. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  19. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  20. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  1. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  2. A Novel Approach to Practice-Based Learning and Improvement Using a Web-Based Audit and Feedback Module

    PubMed Central

    Boggan, Joel C.; Cheely, George; Shah, Bimal R.; Heffelfinger, Randy; Springall, Deanna; Thomas, Samantha M.; Zaas, Aimee; Bae, Jonathan

    2014-01-01

    Background Systematically engaging residents in large programs in quality improvement (QI) is challenging. Objective To coordinate a shared QI project in a large residency program using an online tool. Methods A web-based QI tool guided residents through a 2-phase evaluation of performance of foot examinations in patients with diabetes. In phase 1, residents completed reviews of health records with online data entry. Residents were then presented with personal performance data relative to peers and were prompted to develop improvement plans. In phase 2, residents again reviewed personal performance. Rates of performance were compared at the program and clinic levels for each phase, with data presented for residents. Acceptability was measured by the number of residents completing each phase. Feasibility was measured by estimated faculty, programmer, and administrator time and costs. Results Seventy-nine of 86 eligible residents (92%) completed improvement plans and reviewed 1471 patients in phase 1, whereas 68 residents (79%) reviewed 1054 patient charts in phase 2. Rates of performance of examination increased significantly between phases (from 52% to 73% for complete examination, P < .001). Development of the tool required 130 hours of programmer time. Project analysis and management required 6 hours of administrator and faculty time monthly. Conclusions An online tool developed and implemented for program-wide QI initiatives successfully engaged residents to participate in QI activities. Residents using this tool demonstrated improvement in a selected quality target. This tool could be adapted by other graduate medical education programs or for faculty development. PMID:26279782

  3. Safety and Environmental Regulation in Industrial Mobilization

    DTIC Science & Technology

    1985-01-01

    shrinking industrial base and a reluctance of many firms to seek out de- fense business? When these "how" questions are answered, plans and programs...stantiated. During this phase, Department of Defense (DOD) offi- cials were interviewed for their plans for addressing the specifics of OSHA and EPA...develop and enforce their own job- safety and health programs. If a State’s plan is approved by OSHA, OSHA pays the State up to 50 percent of the

  4. An Introduction to Emergency Medical Services (EMS). Pre-Hospital Phase. Emergency Medical Services Orientation, Lesson Plan No. 9.

    ERIC Educational Resources Information Center

    Young, Derrick P.

    Designed for use with interested students at high schools, community colleges, and four-year colleges, this lesson plan was developed to provide an introduction to the pre-hospital phase of Emergency Medical Services (EMS) and to serve as a recruitment tool for the EMS Program at Kapiolani Community College (KCC) in Hawaii. The objectives of the…

  5. Working Group 1: Current plans of various organisations for lunar activities

    NASA Technical Reports Server (NTRS)

    Balsiger, H.; Pilcher, C.

    1994-01-01

    Summaries of presentations by representatives of several space agencies and the International Academy of Astronautics concerning lunar activities are presented. Participating space agencies reported two different types of lunar planning, long term planning and scenarios and lunar missions competing within regular programs. The long term plans of the various agencies look remarkably similar. They all involve a phased approach (coincidentally all incorporating four phases) and all address three prime scientific elements: science of, on, and from the Moon. The missions under consideration by the second group of agencies could readily fit as elements in the longer term program. There is great interest in lunar astronomy. There is a great deal of potential infrastructure and lunar transport capability already available. There is also a wide range of interesting technological developments that could form part of a lunar program. A well concerted and coordinated international effort could lead to an affordable program. Recommendations are: an international conference on lunar exploration should be held every other year; an electronic network should be established for the daily exchange of information; and a mechanism should be established for regular working level coordination of activities.

  6. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer, in formulating the Affirmative Action Plan, should consider all phases of... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Formulation of affirmative...

  7. Swimming Pools. A Guide to Their Planning, Design and Operation.

    ERIC Educational Resources Information Center

    Gabrielsen, M. Alexander, Ed.

    Information is presented regarding all phases of swimming pool development and operation from earliest planning considerations to final programing. This comprehensive book covers--(1) the steps involved in planning a pool, (2) designing the pool, (3) water circulation, filtration, and treatment, (4) community pools, school and agency pools, and…

  8. Connected Vehicle Pilot Deployment Program Phase 1, Participant Training and Stakeholder Education Plan– New York City.

    DOT National Transportation Integrated Search

    2016-07-22

    High level plan that describes the Training and Stakeholder Education plan for the New York City Connected Vehicle Pilot Deployment. The purpose of the training and education plan is to identify the roles that participants will take during the pilot ...

  9. Natural environment application for NASP-X-30 design and mission planning

    NASA Technical Reports Server (NTRS)

    Johnson, D. L.; Hill, C. K.; Brown, S. C.; Batts, G. W.

    1993-01-01

    The NASA/MSFC Mission Analysis Program has recently been utilized in various National Aero-Space Plane (NASP) mission and operational planning scenarios. This paper focuses on presenting various atmospheric constraint statistics based on assumed NASP mission phases using established natural environment design, parametric, threshold values. Probabilities of no-go are calculated using atmospheric parameters such as temperature, humidity, density altitude, peak/steady-state winds, cloud cover/ceiling, thunderstorms, and precipitation. The program although developed to evaluate test or operational missions after flight constraints have been established, can provide valuable information in the design phase of the NASP X-30 program. Inputting the design values as flight constraints the Mission Analysis Program returns the probability of no-go, or launch delay, by hour by month. This output tells the X-30 program manager whether the design values are stringent enough to meet his required test flight schedules.

  10. Space Shuttle flying qualities and flight control system assessment study, phase 2

    NASA Technical Reports Server (NTRS)

    Myers, T. T.; Johnston, D. E.; Mcruer, D. T.

    1983-01-01

    A program of flying qualities experiments as part of the Orbiter Experiments Program (OEX) is defined. Phase 1, published as CR-170391, reviewed flying qualities criteria and shuttle data. The review of applicable experimental and shuttle data to further define the OEX plan is continued. An unconventional feature of this approach is the use of pilot strategy model identification to relate flight and simulator results. Instrumentation, software, and data analysis techniques for pilot model measurements are examined. The relationship between shuttle characteristics and superaugmented aircraft is established. STS flights 1 through 4 are reviewed from the point of view of flying qualities. A preliminary plan for a coordinated program of inflight and simulator research is presented.

  11. Using multilevel, multisource needs assessment data for planning community interventions.

    PubMed

    Levy, Susan R; Anderson, Emily E; Issel, L Michele; Willis, Marilyn A; Dancy, Barbara L; Jacobson, Kristin M; Fleming, Shirley G; Copper, Elizabeth S; Berrios, Nerida M; Sciammarella, Esther; Ochoa, Mónica; Hebert-Beirne, Jennifer

    2004-01-01

    African Americans and Latinos share higher rates of cardiovascular disease (CVD) and diabetes compared with Whites. These diseases have common risk factors that are amenable to primary and secondary prevention. The goal of the Chicago REACH 2010-Lawndale Health Promotion Project is to eliminate disparities related to CVD and diabetes experienced by African Americans and Latinos in two contiguous Chicago neighborhoods using a community-based prevention approach. This article shares findings from the Phase 1 participatory planning process and discusses the implications these findings and lessons learned may have for programs aiming to reduce health disparities in multiethnic communities. The triangulation of data sources from the planning phase enriched interpretation and led to more creative and feasible suggestions for programmatic interventions across the four levels of the ecological framework. Multisource data yielded useful information for program planning and a better understanding of the cultural differences and similarities between African Americans and Latinos.

  12. Choice or Chance. Planning for Independent College Marketing and Retention. Report on the Admissions and Retention Phase of Northwest Area Foundation's Independent College Program 1973-1975.

    ERIC Educational Resources Information Center

    Hayden, Mary; And Others

    As a result of a study in 1972, in which independent college administrators were asked to assess their growth needs and problems, the Northwest Area Foundation established the Independent College Program to assist colleges in dealing with their needs. The first phase, the Admissions and Retention Program, was designed to assist colleges in coping…

  13. NASA's commercial research plans and opportunities

    NASA Technical Reports Server (NTRS)

    Arnold, Ray J.

    1992-01-01

    One of the primary goals of the National Aeronautics and Space Administration's (NASA) commercial space development plan is to encourage the development of space-based products and markets, along with the infrastructure and transportation that will support those products and markets. A three phased program has been instituted to carry out this program. The first phase utilizes government grants through the Centers for the Commercial Development of Space (CCDS) for space-related, industry driven research; the development of a technology data base; and the development of commercial space transportation and infrastructure. The second phase includes the development of these technologies by industry for new commercial markets, and features unique industry/government collaborations such as Joint Endeavor Agreements. The final phase will feature technical applications actually brought to the marketplace. The government's role will be to support industry required infrastructure to encourage start-up markets and industries through follow-on development agreements such as the Space Systems Development Agreement. The Office of Commercial Programs has an aggressive flight program underway on the Space Shuttle, suborbital rockets, orbital expendable launch vehicles, and the Commercial Middeck Accommodation Module with SPACEHAB Inc. The Office of Commercial Program's has been allocated 35 percent of the U.S. share of the Space Station Freedom resources for 1997 utilization. A utilization plan has been developed with the Centers for the Commercial Development of Space and has identified eleven materials processing and biotechnology payloads occupying 5 double racks in the pressurized module as well as two payloads external to the module in materials exposure and environment monitoring. The Office of Commercial Programs will rely on the Space Station Freedom to provide the long duration laboratory component for space-based commercial research.

  14. NASA's commercial research plans and opportunities

    NASA Astrophysics Data System (ADS)

    Arnold, Ray J.

    One of the primary goals of the National Aeronautics and Space Administration's (NASA) commercial space development plan is to encourage the development of space-based products and markets, along with the infrastructure and transportation that will support those products and markets. A three phased program has been instituted to carry out this program. The first phase utilizes government grants through the Centers for the Commercial Development of Space (CCDS) for space-related, industry driven research; the development of a technology data base; and the development of commercial space transportation and infrastructure. The second phase includes the development of these technologies by industry for new commercial markets, and features unique industry/government collaborations such as Joint Endeavor Agreements. The final phase will feature technical applications actually brought to the marketplace. The government's role will be to support industry required infrastructure to encourage start-up markets and industries through follow-on development agreements such as the Space Systems Development Agreement. The Office of Commercial Programs has an aggressive flight program underway on the Space Shuttle, suborbital rockets, orbital expendable launch vehicles, and the Commercial Middeck Accommodation Module with SPACEHAB Inc. The Office of Commercial Program's has been allocated 35 percent of the U.S. share of the Space Station Freedom resources for 1997 utilization. A utilization plan has been developed with the Centers for the Commercial Development of Space and has identified eleven materials processing and biotechnology payloads occupying 5 double racks in the pressurized module as well as two payloads external to the module in materials exposure and environment monitoring. The Office of Commercial Programs will rely on the Space Station Freedom to provide the long duration laboratory component for space-based commercial research.

  15. Industrial advanced turbine systems: Development and demonstration. Annual report, October 1, 1996--September 30, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-12-31

    The US DOE has initiated a program for advanced turbine systems (ATS) that will serve industrial power generation markets. The ATS will provide ultra-high efficiency, environmental superiority, and cost competitiveness. The ATS will foster (1) early market penetration that enhances the global competitiveness of US industry, (2) public health benefits resulting from reduced exhaust gas emissions of target pollutants, (3) reduced cost of power used in the energy-intensive industrial marketplace and (4) the retention and expansion of the skilled US technology base required for the design, development and maintenance of state-of-the-art advanced turbine products. The Industrial ATS Development and Demonstrationmore » program is a multi-phased effort. Solar Turbines Incorporated (Solar) has participated in Phases 1 and 2 of the program. On September 14, 1995 Solar was awarded a Cooperative Agreement for Phases 3 and 4 of the program. Phase 3 of the work is separated into two subphases: Phase 3A entails Component Design and Development Phase 3B will involve Integrated Subsystem Testing. Phase 4 will cover Host Site Testing. Forecasts call for completion of the program within budget as originally estimated. Scheduled completion is forecasted to be approximately 3 years late to original plan. This delay has been intentionally planned in order to better match program tasks to the anticipated availability of DOE funds. To ensure the timely realization of DOE/Solar program goals, the development schedule for the smaller system (Mercury 50) and enabling technologies has been maintained, and commissioning of the field test unit is scheduled for May of 2000. As of the end of the reporting period work on the program is 22.80% complete based upon milestones completed. This measurement is considered quite conservative as numerous drawings on the Mercury 50 are near release. Variance information is provided in Section 4.0-Program Management.« less

  16. Connected Vehicle Pilot Deployment Program Phase 1, Outreach Plan – Tampa (THEA).

    DOT National Transportation Integrated Search

    2016-07-06

    This document presents the Outreach Plan for the Tampa Hillsborough Expressway Authority (THEA) Connected Vehicle (CV) Pilot Deployment. The goal of the pilot deployment is to advance and enable safe, interoperable, networked wireless communications ...

  17. Renewable energy in electric utility capacity planning: a decomposition approach with application to a Mexican utility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Staschus, K.

    1985-01-01

    In this dissertation, efficient algorithms for electric-utility capacity expansion planning with renewable energy are developed. The algorithms include a deterministic phase that quickly finds a near-optimal expansion plan using derating and a linearized approximation to the time-dependent availability of nondispatchable energy sources. A probabilistic second phase needs comparatively few computer-time consuming probabilistic simulation iterations to modify this solution towards the optimal expansion plan. For the deterministic first phase, two algorithms, based on a Lagrangian Dual decomposition and a Generalized Benders Decomposition, are developed. The probabilistic second phase uses a Generalized Benders Decomposition approach. Extensive computational tests of the algorithms aremore » reported. Among the deterministic algorithms, the one based on Lagrangian Duality proves fastest. The two-phase approach is shown to save up to 80% in computing time as compared to a purely probabilistic algorithm. The algorithms are applied to determine the optimal expansion plan for the Tijuana-Mexicali subsystem of the Mexican electric utility system. A strong recommendation to push conservation programs in the desert city of Mexicali results from this implementation.« less

  18. Integration of Treatment Innovation Planning and Implementation: Strategic Process Models and Organizational Challenges

    PubMed Central

    Lehman, Wayne E. K.; Simpson, D. Dwayne; Knight, Danica K.; Flynn, Patrick M.

    2015-01-01

    Sustained and effective use of evidence-based practices in substance abuse treatment services faces both clinical and contextual challenges. Implementation approaches are reviewed that rely on variations of plan-do-study-act (PDSA) cycles, but most emphasize conceptual identification of core components for system change strategies. A 2-phase procedural approach is therefore presented based on the integration of TCU models and related resources for improving treatment process and program change. Phase 1 focuses on the dynamics of clinical services, including stages of client recovery (cross-linked with targeted assessments and interventions), as the foundations for identifying and planning appropriate innovations to improve efficiency and effectiveness. Phase 2 shifts to the operational and organizational dynamics involved in implementing and sustaining innovations (including the stages of training, adoption, implementation, and practice). A comprehensive system of TCU assessments and interventions for client and program-level needs and functioning are summarized as well, with descriptions and guidelines for applications in practical settings. PMID:21443294

  19. Phased project planning and development in anticipation of operational programs

    NASA Technical Reports Server (NTRS)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  20. DOCUMENTATION OF STEPS TO ESTABLISH A TECHNICAL COLLEGE, AND THE EVALUATION OF "PERT" AS A PLANNING TOOL FOR EDUCATORS, PHASE I.

    ERIC Educational Resources Information Center

    MCKEE, ROBERT L.; RIDLEY, KATHRYN J.

    TO ESTABLISH A COLLEGE IN 100 DAYS PRESENTED AN OPPORTUNITY TO TEST THE VALUE OF PROGRAMED ORGANIZATIONAL PROCEDURES USING PROGRAM PERFORMANCE EVALUATION AND REVIEW TECHNIQUE (PERT) UNDER ACTUAL OPERATIONAL CONDITIONS, NOT IN A SIMULATED THEORETICAL SITUATION. THROUGH THE AID OF THE PERT PLANNING SYSTEM, IT WAS DETERMINED THAT THERE WERE NINE…

  1. Phase 2 design study of the electronic assembly for the HRUV spectrometer/polarimeter intended for the solar maximum mission. Implementation phase program plan, revision A

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The primary function of the implementation phase is to convert the ERA design of the design study phase into deliverable flight hardware. The development aspects of the experiment logic unit, the dual power converter, the junction box and the cables are considered.

  2. Application of modern tools and techniques to maximize engineering productivity in the development of orbital operations plans for the space station progrm

    NASA Technical Reports Server (NTRS)

    Manford, J. S.; Bennett, G. R.

    1985-01-01

    The Space Station Program will incorporate analysis of operations constraints and considerations in the early design phases to avoid the need for later modifications to the Space Station for operations. The application of modern tools and administrative techniques to minimize the cost of performing effective orbital operations planning and design analysis in the preliminary design phase of the Space Station Program is discussed. Tools and techniques discussed include: approach for rigorous analysis of operations functions, use of the resources of a large computer network, and providing for efficient research and access to information.

  3. Advanced manufacturing development of a composite empennage component for L-1011 aircraft

    NASA Technical Reports Server (NTRS)

    Alva, T.; Henkel, J.; Johnson, R.; Carll, B.; Jackson, A.; Mosesian, B.; Brozovic, R.; Obrien, R.; Eudaily, R.

    1982-01-01

    This is the final report of technical work conducted during the fourth phase of a multiphase program having the objective of the design, development and flight evaluation of an advanced composite empennage component manufactured in a production environment at a cost competitive with those of its metal counterpart, and at a weight savings of at least 20 percent. The empennage component selected for this program is the vertical fin box of the L-1011 aircraft. The box structure extends from the fuselage production joint to the tip rib and includes front and rear spars. During Phase 4 of the program, production quality tooling was designed and manufactured to produce three sets of covers, ribs, spars, miscellaneous parts, and subassemblies to assemble three complete ACVF units. Recurring and nonrecurring cost data were compiled and documented in the updated producibility/design to cost plan. Nondestruct inspections, quality control tests, and quality acceptance tests were performed in accordance with the quality assurance plan and the structural integrity control plan. Records were maintained to provide traceability of material and parts throughout the manufacturing development phase. It was also determined that additional tooling would not be required to support the current and projected L-1011 production rate.

  4. Directions for the '80s: Educational Master Plan. San Francisco Community College District.

    ERIC Educational Resources Information Center

    Duncan-Hall, Tyra L., Ed.

    Designed to assist staff in the San Francisco Community College District (SFCCD) in synthesizing the trends, events and issues that are likely to influence educational programs and services, this master plan assesses the district's internal and external environments and describes the SFCCD's two-phase planning process. Chapter 1 discusses the…

  5. Central Alaska Network vital signs monitoring plan

    USGS Publications Warehouse

    MacCluskie, Margaret C.; Oakley, Karen L.; McDonald, Trent; Wilder, Doug

    2005-01-01

    Denali National Park and Preserve, Wrangell-St. Elias National Park and Preserve, and Yukon-Charley Rivers National Preserve have been organized into the Central Alaska Network (CAKN) for the purposes of carrying out ecological monitoring activities under the National Park Services’ Vital Signs Monitoring program. The Phase III Report is the initial draft of the Vital Signs Monitoring Plan for the Central Alaska Network. It includes updated material from the Phase I and II documents. This report, and draft protocols for 11 of the network’s Vital Signs, were peer reviewed early in 2005. Review comments were incorporated into the document bringing the network to the final stage of having a Vital Signs Monitoring Plan. Implementation of the program will formally begin in FY 2006. The broad goals of the CAKN monitoring program are to: (1) better understand the dynamic nature and condition of park ecosystems; and (2) provide reference points for comparisons with other, altered environments. The focus of the CAKN program will be to monitor ecosystems in order to detect change in ecological components and in the relationships among the components. Water quality monitoring is fully integrated within the CAKN monitoring program. A monitoring program for lentic (non-moving water) has been determined, and the program for lotic systems (moving water) is under development.

  6. Notification: Review of the Contract Management Assessment Program

    EPA Pesticide Factsheets

    Project #OA-FY14-0034, October 30, 2013. The Office of Inspector General plans to begin the preliminary research phase of an audit evaluating the Office of Acquisition Management’s Contract Management Assessment Program (CMAP).

  7. The Development of MUMPS-Based Rehabilitation Psychology Computer Applications.

    ERIC Educational Resources Information Center

    Dutro, Kenneth R.

    The use of computer assisted programs in career exploration and occupational information is well documented. Various phases of the vocational counseling process, i.e., diagnostic evaluation, program planning, career exploration, case management, and program evaluation, offer similarly promising opportunities for computerization. Using the…

  8. Operations planning and analysis handbook for NASA/MSFC phase B development projects

    NASA Technical Reports Server (NTRS)

    Batson, Robert C.

    1986-01-01

    Current operations planning and analysis practices on NASA/MSFC Phase B projects were investigated with the objectives of (1) formalizing these practices into a handbook and (2) suggesting improvements. The study focused on how Science and Engineering (S&E) Operational Personnel support Program Development (PD) Task Teams. The intimate relationship between systems engineering and operations analysis was examined. Methods identified for use by operations analysts during Phase B include functional analysis, interface analysis methods to calculate/allocate such criteria as reliability, Maintainability, and operations and support cost.

  9. Connected vehicle pilot deployment program phase 1, safety management plan – Tampa (THEA).

    DOT National Transportation Integrated Search

    2016-04-01

    This document presents the Safety Management Plan for the THEA Connected Vehicle (CV) Pilot Deployment. The THEA CV Pilot Deployment goal is to advance and enable safe, interoperable, networked wireless communications among vehicles, the infrastructu...

  10. GIS tools for strategic SB375 planning and program participation

    DOT National Transportation Integrated Search

    2010-12-02

    The just-completed (2009-2010) phase of this project corresponds to the second year of an envisioned three-year initiative on integrated transportation and land use planning supported by the Leonard Transportation Center (LTC) and USDOT, and performe...

  11. Site characterization progress report: Yucca Mountain, Nevada. Number 15, April 1--September 30, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-01

    During the second half of fiscal year 1996, activities at the Yucca Mountain Site Characterization Project (Project) supported the objectives of the revised Program Plan released this period by the Office of Civilian Radioactive Waste Management of the US Department of Energy (Department). Outlined in the revised plan is a focused, integrated program of site characterization, design, engineering, environmental, and performance assessment activities that will achieve key Program and statutory objectives. The plan will result in the development of a license application for repository construction at Yucca Mountain, if the site is found suitable. Activities this period focused on twomore » of the three near-term objectives of the revised plan: updating in 1997 the regulatory framework for determining the suitability of the site for the proposed repository concept and providing information for a 1998 viability assessment of continuing toward the licensing of a repository. The Project has also developed a new design approach that uses the advanced conceptual design published during the last reporting period as a base for developing a design that will support the viability assessment. The initial construction phase of the Thermal Testing Facility was completed and the first phase of the in situ heater tests began on schedule. In addition, phase-one construction was completed for the first of two alcoves that will provide access to the Ghost Dance fault.« less

  12. A systematic plan for the continued study of dimensional stability of metallic alloys considered for the fabrication of cryogenic wind tunnel models

    NASA Technical Reports Server (NTRS)

    Wigley, D. A.

    1985-01-01

    Interrelated research and development activities, phased development of stepped specimen program are documented and a sequence for a specific program of machining, validation and heat treatment cycles for one material are described. Proposed work for the next phase of dimensional stability research is presented and further technology development activities are proposed.

  13. RASSP final technical report

    NASA Astrophysics Data System (ADS)

    1992-10-01

    The overall objective of the DARPA/Tri-Service RASSP program is to demonstrate a capability to rapidly specify, produce, and yield domain-specific, affordable signal processors for use in Department of Defense systems such as automatic target acquisition, tracking, and recognition, electronic countermeasures, communications, and SIGINT. The objective of the study phase is to specify a recommended program plan for the government to use as a template for procurement of the RASSP design system and demonstration program. To accomplish that objective, the study phase program tasks are to specify a development methodology for signal processors (adaptable to various organizational design styles, and application areas), analyze the requirements in CAD/CAE tools to support the development methodology, identify the state and development plans of the industry relative to this area, and to recommend the additional developments not currently being addressed by the industry, which are recommended as RASSP developments. In addition, the RASSP study phase will define a linking approach for electronically linking design centers to manufacturing centers so a complete cycle for prototyping can be accomplished with significantly reduced cycle time.

  14. Planning, Implementation, and Evaluation of AIDS Education Programs for Dentists.

    ERIC Educational Resources Information Center

    Gerbert, Barbara; And Others

    1991-01-01

    An office-based continuing education program on acquired immune deficiency syndrome (AIDS) for dentists is described, including needs assessment, model development, local piloting, national implementation with 119 dentists, and evaluation phases. Program evaluation indicated an improvement in risk perception, knowledge, and practice resulted, but…

  15. Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1975-01-01

    This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

  16. Analysis of strategic plans to assess planning for sustainability of comprehensive community initiatives.

    PubMed

    Sridharan, Sanjeev; Go, Sodam; Zinzow, Heidi; Gray, Aracelis; Barrett, Melissa Gutierrez

    2007-02-01

    In order to achieve the intended impact on a community, comprehensive community initiatives must sustain programs once they have been implemented. However, planning for sustainability is challenging and is rarely incorporated in the planning process of an initiative. The current study examined 19 5-year plans developed during the planning phase of the Comprehensive Strategy for Serious, Violent and Chronic Juvenile Offenders. Quantitative and qualitative methods were employed to assess the extent to which the construct of sustainability was incorporated. The plan analysis was supplemented with results from other components of the complex evaluation design implemented as part of the process evaluation of Comprehensive Strategy. Results suggested that sustainability was not accounted for during the planning phase of this initiative. The implications of these findings, including the importance of planning for sustainability in order to achieve sustainability, are discussed.

  17. Medical Applications of the PHITS Code (3): User Assistance Program for Medical Physics Computation.

    PubMed

    Furuta, Takuya; Hashimoto, Shintaro; Sato, Tatsuhiko

    2016-01-01

    DICOM2PHITS and PSFC4PHITS are user assistance programs for medical physics PHITS applications. DICOM2PHITS is a program to construct the voxel PHITS simulation geometry from patient CT DICOM image data by using a conversion table from CT number to material composition. PSFC4PHITS is a program to convert the IAEA phase-space file data to PHITS format to be used as a simulation source of PHITS. Both of the programs are useful for users who want to apply PHITS simulation to verification of the treatment planning of radiation therapy. We are now developing a program to convert dose distribution obtained by PHITS to DICOM RT-dose format. We also want to develop a program which is able to implement treatment information included in other DICOM files (RT-plan and RT-structure) as a future plan.

  18. A Field Study Program in Analytical Chemistry for College Seniors.

    ERIC Educational Resources Information Center

    Langhus, D. L.; Flinchbaugh, D. A.

    1986-01-01

    Describes an elective field study program at Moravian College (Pennsylvania) in which seniors in analytical chemistry obtain first-hand experience at Bethlehem Steel Corporation. Discusses the program's planning phase, some method development projects done by students, experiences received in laboratory operations, and the evaluation of student…

  19. Santa Fe Community College Staff Development Programs, Policies and Procedures.

    ERIC Educational Resources Information Center

    Santa Fe Community Coll., NM.

    This collection of materials describes various aspects of Santa Fe Community College's (SFCC's) faculty and staff development program. Part 1 explains the philosophy that underpins staff development at SFCC; the planning, programming, information dissemination, and evaluation phases of staff development; and the use of professional development…

  20. Development of a preprototype times wastewater recovery subsystem: Appendices

    NASA Technical Reports Server (NTRS)

    Roebelen, G. J., Jr.; Dehner, G. F.

    1984-01-01

    This Master Test Plan outlines the test program to be performed by Hamilton Standard during the Urine Water Recovery Subsystem Program. Testing is divided into three phases: (1) design support testing; development component testing; and acceptance testing. The completion of this test program verifies the subsystem operation.

  1. Integrated environmental planning in the Philippines: A case study of the Palawan Integrated Environmental Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ganapin, D.J. Jr.

    1987-01-01

    Integrated environmental planning was analyzed using the case of the Palawan Integrated Environmental Program in the Philippines. The study explores the relationship between development and environmental planning and evaluates the importance of organizational coordination and timing in the integration of these two concerns. Factors affecting the accomplishment of the objectives of integrated environmental planning were also studied. Two planning phases of the Palawan Integrated Environmental Program were observed using the case study approach. Observations of various planning participants-consultants, middle level agency personnel, heads of local agencies-were also considered. The integration of environmental considerations in development planning was found to bemore » beneficial to both environmental and development concerns. The experience showed that such integration requiring tight organizational coordination and the proper timing of activities and outputs. The success of the Palawan Integrated Environmental Program was also found to depend on effective communication, the political functionality of the government, the leadership of its executives, the presence of appropriate structures of authority, sufficiency of funds and manpower and the availability of appropriate environmental planning techniques. Recommendations are provided to further strengthen the integration of environmental considerations in development planning and increase the effectiveness of integrated environmental programs.« less

  2. SU-E-T-151: Breathing Synchronized Delivery (BSD) Planning for RapicArc Treatment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lu, W; Chen, M; Jiang, S

    2015-06-15

    Purpose: To propose a workflow for breathing synchronized delivery (BSD) planning for RapicArc treatment. Methods: The workflow includes three stages: screening/simulation, planning, and delivery. In the screening/simulation stage, a 4D CT with the corresponding breathing pattern is acquired for each of the selected patients, who are able to follow their own breathing pattern. In the planning stage, one breathing phase is chosen as the reference, and contours are delineated on the reference image. Deformation maps to other phases are performed along with contour propagation. Based on the control points of the initial 3D plan for the reference phase and themore » respiration trace, the correlation with respiration phases, the leaf sequence and gantry angles is determined. The beamlet matrices are calculated with the corresponding breathing phase and deformed to the reference phase. Using the 4D dose evaluation tool and the original 3D plan DVHs criteria, the leaf sequence is further optimized to meet the planning objectives and the machine constraints. In the delivery stage, the patients are instructed to follow the programmed breathing patterns of their own, and all other parts are the same as the conventional Rapid-Arc delivery. Results: Our plan analysis is based on comparison of the 3D plan with a static target (SD), 3D plan with motion delivery (MD), and the BSD plan. Cyclic motion of range 0 cm to 3 cm was simulated for phantoms and lung CT. The gain of the BSD plan over MD is significant and concordant for both simulation and lung 4DCT, indicating the benefits of 4D planning. Conclusion: Our study shows that the BSD plan can approach the SD plan quality. However, such BSD scheme relies on the patient being able to follow the same breathing curve that is used in the planning stage during radiation delivery. Funded by Varian Medical Systems.« less

  3. Connected Vehicle Pilot Deployment Program phase 1 : performance measurement and evaluation support plan : New York City : final report.

    DOT National Transportation Integrated Search

    2016-07-12

    This document describes the Performance Measurement and Evaluation Support Plan for the New York City Department of Transportation New York City (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. The report documents the performance metrics tha...

  4. Connected vehicle pilot deployment program phase 2 : data privacy plan – New York City.

    DOT National Transportation Integrated Search

    2016-12-27

    This document represents a data privacy plan for ensuring the data privacy and security of those participating in the New York City connected vehicle pilot. Personally Identifiable Information (PII) and Sensitive PII (SPII) will be collected from var...

  5. Application Development for Optimizing Patient Placement on Aeromedical Evacuation Flights: Proof-of-Concept

    DTIC Science & Technology

    2018-01-12

    outcomes. This study included three phases: knowledge elicitation, establishment of rule-based, logic requirements, and the development of the POC iOS ...establish the logic needed for a mobile app prior to programming for iOS platforms. The study team selected Microsoft Excel because it enabled the...distribution of these plans would streamline the plan development process. Thus, as a proof-of-concept, the study team conducted a multi-phased effort

  6. Apollo experience report: Flight planning for manned space operations

    NASA Technical Reports Server (NTRS)

    Oneill, J. W.; Cotter, J. B.; Holloway, T. W.

    1972-01-01

    The history of flight planning for manned space missions is outlined, and descriptions and examples of the various evolutionary phases of flight data documents from Project Mercury to the Apollo Program are included. Emphasis is given to the Apollo flight plan. Time line format and content are discussed in relationship to the manner in which they are affected by the types of flight plans and various constraints.

  7. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 5. Appendixes G, H, I, J

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    The Quality Assurance/Quality Control (QA/QC) Program for Phase 2 of the Clinch River Remedial Investigation (CRRI) was designed to comply with both Department of Energy (DOE) Order 5700.6C and Environmental Protection Agency (EPA) QAMS-005/80 (EPA 1980a) guidelines. QA requirements and the general QA objectives for Phase 2 data were defined in the Phase 2 Sampling and Analysis Plan (SAP)-Quality Assurance Project Plan, and scope changes noted in the Phase 2 Sampling and Analysis Plan Addendum. The QA objectives for Phase 2 data were the following: (1) Scientific data generated will withstand scientific and legal scrutiny. (2) Data will be gatheredmore » using appropriate procedures for sample collection, sample handling and security, chain of custody (COC), laboratory analyses, and data reporting. (3) Data will be of known precision and accuracy. (4) Data will meet data quality objectives (DQOs) defined in the Phase 2 SAP.« less

  8. Implementing and Evaluating a Rural Community-Based Sexual Abstinence Program: Challenges and Solutions

    ERIC Educational Resources Information Center

    Stauss, Kimberly; Boyas, Javier; Murphy-Erby, Yvette

    2012-01-01

    Informing both program evaluation and practice research, this paper describes lessons learned during the planning, implementation, and pilot phases of an abstinence education program based in a rural community in a southern state in the USA. Although a number of challenges can emerge in successfully implementing and evaluating such a program in a…

  9. NOSC Program Managers Handbook. Revision 1

    DTIC Science & Technology

    1988-02-01

    cost. The effects of application of life-cycle cost analysis through the planning and RIDT&E phases of a program, and the " design to cost" concept on...is the plan for assuring the quality of the design , design documentation, and fabricated/assembled hardware and associated computer software. 13.5.3.2...listings and printouts, which document the n. requirements, design , or details of compute : software; explain the capabilities and limitations of the

  10. Connected vehicle pilot deployment program phase 2, data management plan - Wyoming

    DOT National Transportation Integrated Search

    2017-04-10

    The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...

  11. Notification: Fiscal Year 2015 Risk Assessment of EPA's Purchase Card and Convenience Check Programs

    EPA Pesticide Factsheets

    Project #OA-FY15-0064, August 26, 2015. The U.S. Environmental Protection Agency (EPA) Office oflnspector General (OIG) plans to begin the preliminary research phase ofauditing the agency's purchase card and convenience check programs.

  12. Applying new science leadership theory in planning an international nursing student practice experience in Nepal.

    PubMed

    Doyle, Rose Marie

    2004-09-01

    Planning an international practice experience for nursing students is a challenging, but rewarding, opportunity. Kwantlen University College faculty members' experience of planning for 8 Bachelor of Science in Nursing students to study abroad was no exception. Faculty members' and students' interest prompted a request for a placement in Nepal. The faculty members involved in the planning were dedicated to using a process that would enable them to remain true to the program philosophy and theoretical underpinnings throughout the entire experience, from the planning phase to the follow-up presentation. Using Wheatley's theory, the students and faculty members reexamined their personal leadership styles to ensure they remained relationship focused, rather than task focused. Wheatley maintained that because the potentiality lies in building strong relationships, it is important to support the creative power that lies in those involved in a project. This article describes new science leadership and relates it to the planning phase for the practice experience in Nepal. Then, reflections on how the philosophy of the program may have influenced the experience are shared. Finally, critical reflection on using this theory in nursing education is presented.

  13. Connected Vehicle Pilot Deployment Program Phase 2 : Comprehensive Maintenance and Operations Plan - New York City

    DOT National Transportation Integrated Search

    2018-05-31

    This Comprehensive Maintenance and Operations Plan (CMOP) describes the types and number of equipment to be operated and maintained for the proposed New York City (NYC) Connected Vehicle Pilot Deployment (CVPD) system. Its objective is to develop a p...

  14. Planning for the Introduction of the Metric System into Occupational Education Programs

    ERIC Educational Resources Information Center

    Low, A. W.

    1974-01-01

    A three-dimensional planning model for introducting the International System of Metric Units into Canadian occupational education curricula includes employment level, career area, and metric topics. A fourth dimension, time, is considered in four separate phases: familiarization, adoption, conversion, and compulsory usage.

  15. AIA SCHOOL PLANT STUDIES. A SELECTION 1952-1962.

    ERIC Educational Resources Information Center

    PAWLEY, ERIC

    A COLLECTION OF 40 ARTICLES DISCUSSES VARIOUS ASPECTS OF SCHOOL PLANNING PROBLEMS. THOSE ON PRELIMINARY PHASES REVIEW--(1) ARCHITECT SELECTION, (2) DEVELOPMENT OF EDUCATIONAL PROGRAMS, AND (3) SCHOOL COSTS. ARCHITECTURALLY-)RIENTED ARTICLES COVER--(1) CONSTRUCTION AND STRUCTURAL TYPES, (2) STANDARD SCHOOL PLANS, (3) FLEXIBILITY, (4)…

  16. 40 CFR 300.300 - Phase I-Discovery or notification.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 28 2014-07-01 2014-07-01 false Phase I-Discovery or notification. 300.300 Section 300.300 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION...

  17. 40 CFR 300.300 - Phase I-Discovery or notification.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Phase I-Discovery or notification. 300.300 Section 300.300 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION...

  18. 40 CFR 300.300 - Phase I-Discovery or notification.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Phase I-Discovery or notification. 300.300 Section 300.300 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION...

  19. 40 CFR 300.300 - Phase I-Discovery or notification.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Phase I-Discovery or notification. 300.300 Section 300.300 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION...

  20. Integration of treatment innovation planning and implementation: strategic process models and organizational challenges.

    PubMed

    Lehman, Wayne E K; Simpson, D Dwayne; Knight, Danica K; Flynn, Patrick M

    2011-06-01

    Sustained and effective use of evidence-based practices in substance abuse treatment services faces both clinical and contextual challenges. Implementation approaches are reviewed that rely on variations of plan-do-study-act (PDSA) cycles, but most emphasize conceptual identification of core components for system change strategies. A two-phase procedural approach is therefore presented based on the integration of Texas Christian University (TCU) models and related resources for improving treatment process and program change. Phase 1 focuses on the dynamics of clinical services, including stages of client recovery (cross-linked with targeted assessments and interventions), as the foundations for identifying and planning appropriate innovations to improve efficiency and effectiveness. Phase 2 shifts to the operational and organizational dynamics involved in implementing and sustaining innovations (including the stages of training, adoption, implementation, and practice). A comprehensive system of TCU assessments and interventions for client and program-level needs and functioning are summarized as well, with descriptions and guidelines for applications in practical settings. (PsycINFO Database Record (c) 2011 APA, all rights reserved).

  1. Future of the beam energy scan program at RHIC

    NASA Astrophysics Data System (ADS)

    Odyniec, Grazyna

    2015-05-01

    The first exploratory phase of a very successful Beam Energy Scan Program at RHIC was completed in 2014 with Au+Au collisions at energies ranging from 7 to 39 GeV. Data sets taken earlier extended the upper limit of energy range to the √sNN of 200 GeV. This provided an initial look into the uncharted territory of the QCD phase diagram, which is considered to be the single most important graph of our field. The main results from BES phase I, although effected by large statistical errors (steeply increasing with decreasing energy), suggest that the highest potential for discovery of the QCD Critical Point lies bellow √sNN 20 GeV. Here, we discuss the plans and the preparation for phase II of the BES program, with an order of magnitude larger statistics, which is planned for 2018-2019. The BES II will focus on Au+Au collisions at √sNN from 20 to 7 GeV in collider mode, and from √sNN 7 to 3.5 GeV in the fixed target mode, which will be run concurrently with the collider mode operation.

  2. Future of the Beam Energy Scan program at RHIC

    DOE PAGES

    Odyniec, Grazyna; Bravina, L.; Foka, Y.; ...

    2015-05-29

    The first exploratory phase of a very successful Beam Energy Scan Program at RHIC was completed in 2014 with Au+Au collisions at energies ranging from 7 to 39 GeV. Data sets taken earlier extended the upper limit of energy range to the √sNN of 200 GeV. This provided an initial look into the uncharted territory of the QCD phase diagram, which is considered to be the single most important graph of our field. The main results from BES phase I, although effected by large statistical errors (steeply increasing with decreasing energy), suggest that the highest potential for discovery of themore » QCD Critical Point lies bellow √sNN 20 GeV. Here, we discuss the plans and the preparation for phase II of the BES program, with an order of magnitude larger statistics, which is planned for 2018-2019. The BES II will focus on Au+Au collisions at √sNN from 20 to 7 GeV in collider mode, and from √sNN 7 to 3.5 GeV in the fixed target mode, which will be run concurrently with the collider mode operation.« less

  3. Computer program documentation user information for the MPAD trajectory tape print program (TRJPR1)

    NASA Technical Reports Server (NTRS)

    Gibbs, P. M.

    1981-01-01

    The Trajectory Tape Print Program (TRJPR1) was developed to print applicable information from a Space Trajectory tape created by the Mission Planning and Analysis Division (MPAD) in the MPAD Common Format for the on-orbit phase of the Mission. Instructions for TRJPR1's use are given.

  4. 78 FR 2354 - Approval and Promulgation of Air Quality Implementation Plans; Arkansas; Prevention of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-11

    ...) Prevention of Significant Deterioration (PSD) program updates the Arkansas SIP to incorporate by reference (IBR) requirements for the Federal PSD permitting program under EPA's November 29, 2005 Phase 2 8-hour Ozone Implementation rule. The November 6, 2012 proposed SIP revision to the Arkansas NSR PSD program...

  5. 78 FR 19596 - Approval and Promulgation of Air Quality Implementation Plans; Arkansas; Prevention of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-02

    ...) Prevention of Significant Deterioration (PSD) program updates the Arkansas SIP to incorporate by reference (IBR) requirements for the federal PSD permitting program under EPA's November 29, 2005 Phase 2 8-hour Ozone Implementation rule. The November 6, 2012, SIP revision to the Arkansas NSR PSD program provides...

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biologicalmore » effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.« less

  7. Connected vehicle pilot deployment program phase 2, data privacy plan – Wyoming.

    DOT National Transportation Integrated Search

    2016-04-14

    The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...

  8. Connected vehicle pilot deployment program phase 2 : data management plan - Tampa (THEA).

    DOT National Transportation Integrated Search

    2017-10-01

    The Tampa Hillsborough Expressway Authority (THEA) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle-to-infrastructure (V2I) and vehicle-to-vehicle (V2V) communication technology to re...

  9. Connected vehicle pilot deployment program phase 1, safety management plan – ICF/Wyoming.

    DOT National Transportation Integrated Search

    2016-03-14

    The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...

  10. AgSTAR Partners

    EPA Pesticide Factsheets

    AgSTAR’s Partner Program builds stronger relationships with state and non-governmental stakeholders to support all phases of anaerobic digester projects: planning, deployment, and long-term success.

  11. An allotment planning concept and related computer software for planning the fixed satellite service at the 1988 space WARC

    NASA Technical Reports Server (NTRS)

    Miller, Edward F.; Heyward, Ann O.; Ponchak, Denise S.; Spence, Rodney L.; Whyte, Wayne A., Jr.

    1987-01-01

    The authors describe a two-phase approach to allotment planning suitable for use in planning the fixed satellite service at the 1988 Space World Administrative radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common to groups of administrations and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the conference. Computer software has been developed to implement the concepts, and the logic and rationale for identifying predetermined arc segments is discussed. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.

  12. ISS Payload Operations: The Need for and Benefit of Responsive Planning

    NASA Technical Reports Server (NTRS)

    Nahay, Ed; Boster, Mandee

    2000-01-01

    International Space Station (ISS) payload operations are controlled through implementation of a payload operations plan. This plan, which represents the defined approach to payload operations in general, can vary in terms of level of definition. The detailed plan provides the specific sequence and timing of each component of a payload's operations. Such an approach to planning was implemented in the Spacelab program. The responsive plan provides a flexible approach to payload operations through generalization. A responsive approach to planning was implemented in the NASA/Mir Phase 1 program, and was identified as a need during the Skylab program. The current approach to ISS payload operations planning and control tends toward detailed planning, rather than responsive planning. The use of detailed plans provides for the efficient use of limited resources onboard the ISS. It restricts flexibility in payload operations, which is inconsistent with the dynamic nature of the ISS science program, and it restricts crew desires for flexibility and autonomy. Also, detailed planning is manpower intensive. The development and implementation of a responsive plan provides for a more dynamic, more accommodating, and less manpower intensive approach to planning. The science program becomes more dynamic and responsive as the plan provides flexibility to accommodate real-time science accomplishments. Communications limitations and the crew desire for flexibility and autonomy in plan implementation are readily accommodated with responsive planning. Manpower efficiencies are accomplished through a reduction in requirements collection and coordination, plan development, and maintenance. Through examples and assessments, this paper identifies the need to transition from detailed to responsive plans for ISS payload operations. Examples depict specific characteristics of the plans. Assessments identify the following: the means by which responsive plans accommodate the dynamic nature of science programs and the crew desire for flexibility; the means by which responsive plans readily accommodate ISS communications constraints; manpower efficiencies to be achieved through use of responsive plans; and the implications of responsive planning relative to resource utilization efficiency.

  13. Interstate Transport of Fine Particulate Matter: Revision of Federal Implementation Plan Requirements for Texas (81 FR 78954)

    EPA Pesticide Factsheets

    EPA proposes withdrawing the federal implementation plan provisions that require affected electricity generating units (EGUs) in Texas to participate in Phase 2 of the Cross-State Air Pollution Rule trading programs for annual emissions of SO2 and NOx.

  14. Reconfiguring a Campus--Fast.

    ERIC Educational Resources Information Center

    Hignite, Karla

    2003-01-01

    Describes the first phase of a master plan to expand the University of Alaska-Anchorage by purchasing a shopping mall and reconfiguring campus services to take advantage of the additional space. The master plan calls for eventually moving administration to the periphery of the campus and migrating academic programs to the campus center. (SLD)

  15. Planning and the "Measurable Objective."

    ERIC Educational Resources Information Center

    Miller, Ronald H.

    1973-01-01

    Accountability is being required of all America's institutions of higher education. Gallaudet College, an institution for the deaf in Washington, D.C., feels it has found a solution to the accountability problem in the use of "measurable objectives" in its program planning. The first phase from January 1 through June 30, 1972 of…

  16. Analytical aids in land management planning

    Treesearch

    David R. Betters

    1978-01-01

    Quantitative techniques may be applied to aid in completing various phases of land management planning. Analytical procedures which have been used include a procedure for public involvement, PUBLIC; a matrix information generator, MAGE5; an allocation procedure, linear programming (LP); and an input-output economic analysis (EA). These techniques have proven useful in...

  17. 40 CFR 300.315 - Phase IV-Documentation and cost recovery.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 28 2014-07-01 2014-07-01 false Phase IV-Documentation and cost recovery. 300.315 Section 300.315 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES...

  18. 40 CFR 300.315 - Phase IV-Documentation and cost recovery.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Phase IV-Documentation and cost recovery. 300.315 Section 300.315 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES...

  19. 40 CFR 300.315 - Phase IV-Documentation and cost recovery.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Phase IV-Documentation and cost recovery. 300.315 Section 300.315 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES...

  20. Electric power system test and verification program

    NASA Technical Reports Server (NTRS)

    Rylicki, Daniel S.; Robinson, Frank, Jr.

    1994-01-01

    Space Station Freedom's (SSF's) electric power system (EPS) hardware and software verification is performed at all levels of integration, from components to assembly and system level tests. Careful planning is essential to ensure the EPS is tested properly on the ground prior to launch. The results of the test performed on breadboard model hardware and analyses completed to date have been evaluated and used to plan for design qualification and flight acceptance test phases. These results and plans indicate the verification program for SSF's 75-kW EPS would have been successful and completed in time to support the scheduled first element launch.

  1. Defense Communications Agency Cost and Planning Factors Manual. Change 2.

    DTIC Science & Technology

    1985-09-23

    5 39-6 40. FISCAL -YEAR TIME PHASING OF COST ESTIMATE ...... 40-1 (To be published later) 41. DISCOUNTING General...cubic foot (feet) ft3 /min cubic foot (feet) per minute FY fiscal year FYDP Five Year Defense Program FYP Five Year Program G&A general & administrative... fiscal year 1 of the subsystem project plan. The remainder of the equipment and buildings and the training are to be contracted for and the system turned

  2. TH-CD-202-08: Feasibility Study of Planning Phase Optimization Using Patient Geometry-Driven Information for Better Dose Sparing of Organ at Risks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kang, S; Kim, D; Kim, T

    2016-06-15

    Purpose: To propose a simple and effective cost value function to search optimal planning phase (gating window) and demonstrated its feasibility for respiratory correlated radiation therapy. Methods: We acquired 4DCT of 10 phases for 10 lung patients who have tumor located near OARs such as esophagus, heart, and spinal cord (i.e., central lung cancer patients). A simplified mathematical optimization function was established by using overlap volume histogram (OVH) between the target and organ at risk (OAR) at each phase and the tolerance dose of selected OARs to achieve surrounding OARs dose-sparing. For all patients and all phases, delineation of themore » target volume and selected OARs (esophagus, heart, and spinal cord) was performed (by one observer to avoid inter-observer variation), then cost values were calculated for all phases. After the breathing phases were ranked according to cost value function, the relationship between score and dose distribution at highest and lowest cost value phases were evaluated by comparing the mean/max dose. Results: A simplified mathematical cost value function showed noticeable difference from phase to phase, implying it is possible to find optimal phases for gating window. The lowest cost value which may result in lower mean/max dose to OARs was distributed at various phases for all patients. The mean doses of the OARs significantly decreased about 10% with statistical significance for all 3 OARs at the phase with the lowest cost value. Also, the max doses of the OARs were decreased about 2∼5% at the phase with the lowest cost value compared to the phase with the highest cost value. Conclusion: It is demonstrated that optimal phases (in dose distribution perspective) for gating window could exist differently through each patient and the proposed cost value function can be a useful tool for determining such phases without performing dose optimization calculations. This research was supported by the Mid-career Researcher Program through NRF funded by the Ministry of Science, ICT & Future Planning of Korea (NRF-2014R1A2A1A10050270) and by the Radiation Technology R&D program through the National Research Foundation of Korea funded by the Ministry of Science, ICT & Future Planning (No. 2013M2A2A7038291)« less

  3. [Plan to improve malaria control towards its elimination in Mesoamerica].

    PubMed

    Rodríguez, Mario Henry; Betanzos-Reyes, Angel Francisco

    2011-01-01

    To develop a plan to strengthen the control of malaria towards its elimination. In 2009, under the coordination of the National Public HealthInstitute ofMexico, atransdisciplinary equipment of technical and operative experts was conformed to carry out a situational analysis of malaria and control programs and for the selection of effective practices of intervention that would be incorporated to the plan, within the framework of an exercise in Theory of Change. Criteria for thestratificationof thelocalities, based ontheirtransmission characteristics were established. The structural and operative limitations of the control programs were identified. A plan of interventions was elaborated to improve the coverage of epidemiological surveillance, anti-malaria interventions and opportune diagnosis and treatment of cases. The plan delineates progressive phases of implementation: reorganization, intensification of interventions and evaluation of elimination feasibility. The adoption of a regional strategic plan will provide guidance and administrative elements to conform a system that coordinates the activities of the national control programs and facilitate the elimination of malaria in the region.

  4. Connected Vehicle Pilot Deployment Program phase I : comprehensive Pilot Deployment Plan : Tampa Hillsborough Expressway Authority (THEA) : final report.

    DOT National Transportation Integrated Search

    2016-07-01

    The Tampa Hillsborough Expressway Authority (THEA) Connected Vehicle (CV) Pilot Deployment Program is part of a national effort to advance CV technologies by deploying, demonstrating, testing and offering lessons learned for future deployers. The THE...

  5. Excellent Beginnings: Evaluation of Phase I (1991-1994).

    ERIC Educational Resources Information Center

    Brickman, Alan

    In 1991 the Plan for Social Excellence, Inc., funded three elementary schools to design and implement a comprehensive early childhood education program. This funding initiative, entitled "Excellent Beginnings," supports programs that include innovative curriculum and classroom-management strategies, extensive parent participation, the use of high…

  6. Connected vehicle pilot deployment program phase 1, participant training and education plan – ICF/Wyoming.

    DOT National Transportation Integrated Search

    2016-06-22

    The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...

  7. Connected vehicle pilot deployment program phase II data privacy plan – Tampa (THEA).

    DOT National Transportation Integrated Search

    2017-02-01

    The Tampa Hillsborough Expressway Authority (THEA) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to re...

  8. Software reuse issues affecting AdaNET

    NASA Technical Reports Server (NTRS)

    Mcbride, John G.

    1989-01-01

    The AdaNet program is reviewing its long-term goals and strategies. A significant concern is whether current AdaNet plans adequately address the major strategic issues of software reuse technology. The major reuse issues of providing AdaNet services that should be addressed as part of future AdaNet development are identified and reviewed. Before significant development proceeds, a plan should be developed to resolve the aforementioned issues. This plan should also specify a detailed approach to develop AdaNet. A three phased strategy is recommended. The first phase would consist of requirements analysis and produce an AdaNet system requirements specification. It would consider the requirements of AdaNet in terms of mission needs, commercial realities, and administrative policies affecting development, and the experience of AdaNet and other projects promoting the transfer software engineering technology. Specifically, requirements analysis would be performed to better understand the requirements for AdaNet functions. The second phase would provide a detailed design of the system. The AdaNet should be designed with emphasis on the use of existing technology readily available to the AdaNet program. A number of reuse products are available upon which AdaNet could be based. This would significantly reduce the risk and cost of providing an AdaNet system. Once a design was developed, implementation would proceed in the third phase.

  9. Standard practices for the implementation of computer software

    NASA Technical Reports Server (NTRS)

    Irvine, A. P. (Editor)

    1978-01-01

    A standard approach to the development of computer program is provided that covers the file cycle of software development from the planning and requirements phase through the software acceptance testing phase. All documents necessary to provide the required visibility into the software life cycle process are discussed in detail.

  10. 40 CFR 300.305 - Phase II-Preliminary assessment and initiation of action.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Phase II-Preliminary assessment and initiation of action. 300.305 Section 300.305 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS...

  11. 40 CFR 300.305 - Phase II-Preliminary assessment and initiation of action.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Phase II-Preliminary assessment and initiation of action. 300.305 Section 300.305 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS...

  12. 40 CFR 300.305 - Phase II-Preliminary assessment and initiation of action.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Phase II-Preliminary assessment and initiation of action. 300.305 Section 300.305 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS...

  13. 40 CFR 300.305 - Phase II-Preliminary assessment and initiation of action.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 28 2014-07-01 2014-07-01 false Phase II-Preliminary assessment and initiation of action. 300.305 Section 300.305 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS...

  14. Small Business Innovation Research. Program solicitation. Closing date: July 21, 1992

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The National Aeronautics and Space Administration (NASA) invites small businesses to submit Phase 1 proposals in response to its Small Business Innovation Research (SBIR) Program Solicitation 92-1. Firms with research or research and development capabilities (R/R&D) in science or engineering in any of the areas listed are encouraged to participate. This, the tenth annual SBIR solicitation by NASA, describes the program, identifies eligibility requirements, describes the proposal evaluation and award selection process, and provides other information to assist those interested in participating in NASA's SBIR program. It also identifies, in Section 8.0, the technical topics and subtopics in which SBIR Phase 1 proposals are solicited in 1992. These topics and subtopics cover a broad range of current NASA interests but do not necessarily include all areas in which NASA plans or currently conducts research. The NASA SBIR program seeks innovative approaches that respond to the needs, technical requirements, and new opportunities described in the subtopics. The focus is on innovation through the use of emerging technologies, novel applications of existing technologies, exploitation of scientific breakthroughs, or new capabilities or major improvements to existing technologies. NASA plans to select about 320 high-quality research or research and development proposals for Phase 1 contract awards on the basis of this Solicitation. Phase 1 contracts are normally six months in duration and funded up to $50,000, including profit. Selections will be based on the competitive merits of the offers and on NASA needs and priorities.

  15. Hawaii energy strategy project 3: Renewable energy resource assessment and development program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    RLA Consulting (RLA) has been retained by the State of Hawaii Department of Business, Economic Development and Tourism (DBEDT) to conduct a Renewable Energy Resource Assessment and Development Program. This three-phase program is part of the Hawaii Energy Strategy (HES), which is a multi-faceted program intended to produce an integrated energy strategy for the State of Hawaii. The purpose of Phase 1 of the project, Development of a Renewable Energy Resource Assessment Plan, is to better define the most promising potential renewable energy projects and to establish the most suitable locations for project development in the state. In order tomore » accomplish this goal, RLA has identified constraints and requirements for renewable energy projects from six different renewable energy resources: wind, solar, biomass, hydro, wave, and ocean thermal. These criteria were applied to areas with sufficient resource for commercial development and the results of Phase 1 are lists of projects with the most promising development potential for each of the technologies under consideration. Consideration of geothermal energy was added to this investigation under a separate contract with DBEDT. In addition to the project lists, a monitoring plan was developed with recommended locations and a data collection methodology for obtaining additional wind and solar data. This report summarizes the results of Phase 1. 11 figs., 22 tabs.« less

  16. Minneapolis Human Relations Program: An Evaluation 1972-1973. No. C-72-3.

    ERIC Educational Resources Information Center

    Nesset, Bonna; And Others

    The first phase of the Minneapolis Public Schools' Desegregation/integration Plan involved a human relations oriented staff development program which focused on improving communication skills. The goal of the Human Relations Program for 1972-73 was to change the climate in the schools in preparation for desegregation and integration. The object of…

  17. Evaluating the Facilities Planning, Design, and Construction Department: The Capital Programs Management Audit.

    ERIC Educational Resources Information Center

    Kaiser, Harvey H.; Kirkwood, Dennis M.

    2000-01-01

    Presents a diagnostic model for assessing the state of an institution's capital programs management (CPM) by delineating "work processes" which comprise that function. What capital programs management is, its resources, and its phases and work processes are described, followed by case studies of the CPM Process Model as an assessment tool. (GR)

  18. Improving Programs for the Preparation of Teachers through the Use of Program Evaluation--The Second Phase.

    ERIC Educational Resources Information Center

    Berney, Mary F.

    Plans for the field-testing and implementation of the Accreditation Plus Model (APM) for evaluation of teacher preparation programs are described. Field-testing is taking place in the Center for Teacher Education Evaluation at Tennessee Technological University (Cookeville). The APM is based on the professional judgment approach to program…

  19. Modular space station, phase B extension. Information management advanced development. Volume 5: Software assembly

    NASA Technical Reports Server (NTRS)

    Gerber, C. R.

    1972-01-01

    The development of uniform computer program standards and conventions for the modular space station is discussed. The accomplishments analyzed are: (1) development of computer program specification hierarchy, (2) definition of computer program development plan, and (3) recommendations for utilization of all operating on-board space station related data processing facilities.

  20. Nuclear electric propulsion mission engineering study development program and costs estimates, Phase 2 review

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The results are presented of the second six-month performance period of the Nuclear Electric Propulsion Mission Engineering Study. A brief overview of the program, identifying the study objectives and approach, and a discussion of the program status and schedule are presented. The program results are reviewed and key conclusions to date are summarized. Planned effort for the remainder of the program is reviewed.

  1. Satellite Power Systems (SPS) concept definition study (Exhibit D). Volume 5: Systems engineering/integration research and technology

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1981-01-01

    Guidelines and ground rules followed in the development of requirements for the SPS are presented. Development planning objectives are specified in each of these areas, and evolutionary SPS program scenarios are described for the various concepts studied during the past one year contract. Program descriptions are presented as planning packages of technical tasks, and schedule phasing. Each package identifies the ground based technology effort that will facilitate SPS definitions, designs, development, and operations.

  2. Feed-pump hydraulic performance and design improvement, Phase I: research program design. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, W.H.; Gopalakrishnan, S.; Fehlau, R.

    1982-03-01

    As a result of prior EPRI-sponsored studies, it was concluded that a research program should be designed and implemented to provide an improved basis for the design, procurement, testing, and operation of large feed pumps with increased reliability and stability over the full range of operating conditions. This two-volume report contains a research plan which is based on a review of the present state of the art and which defines the necessary R and D program and estimates the benefits and costs of the program. The recommended research program consists of 30 interrelated tasks. It is designed to perform themore » needed research; to verify the results; to develop improved components; and to publish computer-aided design methods, pump specification guidelines, and a troubleshooting manual. Most of the technology proposed in the research plan is applicable to nuclear power plants as well as to fossil-fired plants. This volume contains appendixes on pump design, cavitation damage, performance testing, hydraulics, two-phase flow in pumps, flow stability, and rotor dynamics.« less

  3. An allotment planning concept and related computer software for planning the fixed satellite service at the 1988 space WARC

    NASA Technical Reports Server (NTRS)

    Miller, Edward F.; Heyward, Ann O.; Ponchak, Denise S.; Spence, Rodney L.; Whyte, Wayne A., Jr.; Zuzek, John E.

    1987-01-01

    Described is a two-phase approach to allotment planning suitable for use in establishing the fixed satellite service at the 1988 Space World Administrative Radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common togroups of administrations, and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the confernece. Computer software has been developed to implement the concepts, and a complete discussion on the logic and rationale for identifying predetermined arc segments is given. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees in practice equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.

  4. Connected Vehicle Pilot Deployment Program Phase 1, Performance Measurement and Evaluation Support Plan – ICF/Wyoming.

    DOT National Transportation Integrated Search

    2016-06-06

    The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...

  5. 49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...

  6. 49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...

  7. 49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...

  8. THE PLANNING AND CONSTRUCTION OF LOUISIANA SCHOOL BUILDINGS.

    ERIC Educational Resources Information Center

    HOLLY, C.E.

    THIS REPORT REPRESENTS A GENERALIZED ANALYSIS OF FACTORS RELATED TO PLANNING AND BUILDING STATE SCHOOLS. THE FIRST SURVEY PHASE IS USED FOR DETERMINATION OF EDUCATIONAL NEEDS AND PROGRAMS. THE RELATIONSHIPS OF THE SCHOOL BOARD TO THE ARCHITECT AS WELL AS PUBLIC SUPPORT AND FINANCE CRITERIA ARE EXPLAINED IN THIS CHAPTER. SITE SELECTION AND…

  9. 49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...

  10. 49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...

  11. [Personal Futures Planning: Building a Foundation for Individualized Transition Services.

    ERIC Educational Resources Information Center

    Carr, Theresa, Ed.

    1993-01-01

    These two newsletter special issues focus on personal futures planning (PFP) for people with deaf blindness, with emphasis on technical assistance activities involved in implementing a PFP program. PFP guides a team through three phases of activities: (1) developing a "circle of support" for an individual with deaf blindness; (2)…

  12. Study findings on evaluation of integrated family planning programme performance.

    PubMed

    1980-01-01

    In 1976 the United Nations's Economic and Social Commission for Asia and the Pacific launched a comparative study on integrated family planning programs in a number of countries in the region. In November 1979 the study directors from the participating countries meet in Bangkok to discuss the current status of the studies in their countries. The Korean and Malaysian studies were completed, the Bangladesh study was in the data collecting phase, and the Pakistani research design phase was completed. The meeting participants focused their attention on the findings and policy implications of the 2 completed studies and also discussed a number of theorectical and methodological issues which grew out of their research experience. The Malaysian study indicated that group structure, financial resources, and the frequency and quality of worker-client contact were the most significant variables determining program effectiveness. In the Korean Study, leadership, financial resources, and the frequency and quality of contact between agencies were the key variables in determining program effectiveness. In the Malaysian study there was a positive correlation between maternal and child health service performance measures and family planning service performance measures. This finding supported the contention that these 2 types of service provision are not in conflict with each other but instead serve to reinforce each other. Policy implications of the Korean study were 1) family planning should be an integral part of all community activities; 2) family planning workers should be adequately supported by financial and supply allocations; and 3) adequate record keeping and information exchange procedures should be incorporated in the programs.

  13. Planning/Budgeting/Evaluation Manual. An Operation Manual for Staff Members Concerning the Implementation of the Planning/Budgeting/Evaluation Cycle Within the Missouri State Department of Education.

    ERIC Educational Resources Information Center

    Missouri State Dept. of Education, Jefferson City.

    This manual identifies and systematizes the sequence of events necessary for the State Department of Education to effectively plan, implement, and evaluate its varied programs. The report (1) describes the cycle, (2) outlines the flow of events, (3) delineates offices responsible for each event, and (4) discusses overlapping phases of event cycles…

  14. The politics of population policy in the Islamic Republic of Iran.

    PubMed

    Hoodfar, H; Assadpour, S

    2000-03-01

    The Islamic Republic of Iran arguably has one of the most successful family planning programs in the developing world. This success is all the more interesting for advocates of population programs because the political leaders of the Islamic regime were once strongly opposed to family planning. Indeed, after gaining power following the 1979 revolution, they were responsible for dismantling Iran's relatively new family planning program and introducing pronatalist policies. This article provides an account of the different phases of the population policy in Iran and examines the diverse elements that led politico-religious leaders to revise their views about fertility control and to participate in creating a workable family planning program. The complex formal and informal strategies that the political experts, the media, the religious authorities, and the government of the Islamic Republic adopted in order to achieve this about-face are described. The analysis is based on data collected by the first author during anthropological field research in 1993-96, by means of informal interviews with officials, with medical personnel, with family planning clients, and with religious leaders.

  15. Fly-by-light flight control system technology development plan

    NASA Technical Reports Server (NTRS)

    Chakravarty, A.; Berwick, J. W.; Griffith, D. M.; Marston, S. E.; Norton, R. L.

    1990-01-01

    The results of a four-month, phased effort to develop a Fly-by-Light Technology Development Plan are documented. The technical shortfalls for each phase were identified and a development plan to bridge the technical gap was developed. The production configuration was defined for a 757-type airplane, but it is suggested that the demonstration flight be conducted on the NASA Transport Systems Research Vehicle. The modifications required and verification and validation issues are delineated in this report. A detailed schedule for the phased introduction of fly-by-light system components has been generated. It is concluded that a fiber-optics program would contribute significantly toward developing the required state of readiness that will make a fly-by-light control system not only cost effective but reliable without mitigating the weight and high-energy radio frequency related benefits.

  16. Notification: Review of the Pace of State Expenditures in the Drinking Water State Revolving Fund Program

    EPA Pesticide Factsheets

    Project #OA-FY13-0214, July 16, 2013. The U.S. Environmental Protection Agency Office of Inspector General plans to begin the fieldwork phase of our audit on the pace of state expenditures in the Drinking Water State Revolving Fund program.

  17. A planning model for expansion and stagnation of higher education in Iran.

    PubMed

    Mohammadi, Aeen; Mojtahedzadeh, Rita; Saadat, Soheil; Karimi, Abdollah; Keshavarz Valian, Hossein

    2014-01-01

    Iran universities of medical sciences have experienced a period of expansion in past decades. Now previous concerns are alleviated, and the former quantity-based policy has given a way to a more quality-seeking attitude. In this study, we developed a planning model for expansion and stagnation of higher education in Iranian universities of medical sciences based on workforce requirements of the country and capabilities of the universities. The plan provided an objectively documented base for the authorities to decide on developmental limits of universities. We devised guidelines for justifying existing programs within universities, assigning new undergraduate and postgraduate programs to universities, voluntary request of universities to cancel a program, and their request to offer new programs for the first time in the country, based on three factors: university educational status, each university-program educational status and the nation's need for each discipline. Related councils of the Ministry of Health and Medical Education legitimately approved the plan and guidelines. In this article, we introduced the methodology of developing the plan, described it and its related guidelines and discussed challenges and limitations we encountered in design and application phases.

  18. Strategic Environmental Research & Development Program (SERDP): Phase I and Phase II Strategic Investment Plans FY 1992 and Interim Status Report of the Council.

    DTIC Science & Technology

    1993-10-01

    VLF/ELF) communication systems, used for early warning and strategic communications, are dependent on the electron densities in the "C" and "D...information into optical or electronic signals that can be remotely monitored. During FY92, an in-depth and definitive assessment of the feasibility...particularly metal finishing and electronics operations. BENEFITS: The broad program described above will provide the opportunity for EPA, the

  19. SPHERES: From Ground Development to Operations on ISS

    NASA Technical Reports Server (NTRS)

    Katterhagen, A.

    2015-01-01

    SPHERES (Synchronized Position Hold Engage and Reorient Experimental Satellites) is an internal International Space Station (ISS) Facility that supports multiple investigations for the development of multi-spacecraft and robotic control algorithms. The SPHERES Facility on ISS is managed and operated by the SPHERES National Lab Facility at NASA Ames Research Center (ARC) at Moffett Field California. The SPHERES Facility on ISS consists of three self-contained eight-inch diameter free-floating satellites which perform the various flight algorithms and serve as a platform to support the integration of experimental hardware. To help make science a reality on the ISS, the SPHERES ARC team supports a Guest Scientist Program (GSP). This program allows anyone with new science the possibility to interface with the SPHERES team and hardware. In addition to highlighting the available SPHERES hardware on ISS and on the ground, this presentation will also highlight ground support, facilities, and resources available to guest researchers. Investigations on the ISS evolve through four main phases: Strategic, Tactical, Operations, and Post Operations. The Strategic Phase encompasses early planning beginning with initial contact by the Principle Investigator (PI) and the SPHERES program who may work with the PI to assess what assistance the PI may need. Once the basic parameters are understood, the investigation moves to the Tactical Phase which involves more detailed planning, development, and testing. Depending on the nature of the investigation, the tactical phase may be split into the Lab Tactical Phase or the ISS Tactical Phase due to the difference in requirements for the two destinations. The Operations Phase is when the actual science is performed; this can be either in the lab, or on the ISS. The Post Operations Phase encompasses data analysis and distribution, and generation of summary status and reports. The SPHERES Operations and Engineering teams at ARC is composed of experts who can guide the Payload Developer (PD) and Principle Investigator (PI) in reaching critical milestones to make their science a reality using the SPHERES platform. From performing integrated safety and verification assessments, to assisting in developing crew procedures and operations products, to organizing, planning, and executing all test sessions, to helping manage data products, the SPHERES team at ARC is available to support microgravity research with the SPEHRES Guest Scientist Program.

  20. Designing and Developing Lesson Plans for K-12 Classrooms

    ERIC Educational Resources Information Center

    Shores, Melanie L.; Smith, Tommy G.

    2011-01-01

    The overarching goal of this four-phase, in-service project--Girls Engaged in Mathematics and Science--was to change attitudes, behavior, pedagogy, and curriculum for girls through the provision of a vibrant, engaging, digital portal program with media that extends learning beyond the traditional classroom. Described here, Phases I and II were…

  1. Conducting a Competitive Prototype Acquisition Program: An Account of the Joint Light Tactical Vehicle (JLTV) Technology Development Phase

    DTIC Science & Technology

    2013-03-01

    9  B.  REQUIREMENTS ANALYSIS PROCESS ..................................................9  1.  Requirements Management and... Analysis Plan ................................9  2.  Knowledge Point Reviews .................................................................11  3...are Identified .......12  5.  RMAP/CDD Process Analysis and Results......................................13  IV.  TD PHASE BEGINS

  2. Weather Avoidance Using Route Optimization as a Decision Aid: An AWIN Topical Study. Phase 1

    NASA Technical Reports Server (NTRS)

    1998-01-01

    The aviation community is faced with reducing the fatal aircraft accident rate by 80 percent within 10 years. This must be achieved even with ever increasing, traffic and a changing National Airspace System. This is not just an altruistic goal, but a real necessity, if our growing level of commerce is to continue. Honeywell Technology Center's topical study, "Weather Avoidance Using Route Optimization as a Decision Aid", addresses these pressing needs. The goal of this program is to use route optimization and user interface technologies to develop a prototype decision aid for dispatchers and pilots. This decision aid will suggest possible diversions through single or multiple weather hazards and present weather information with a human-centered design. At the conclusion of the program, we will have a laptop prototype decision aid that will be used to demonstrate concepts to industry for integration into commercialized products for dispatchers and/or pilots. With weather a factor in 30% of aircraft accidents, our program will prevent accidents by strategically avoiding weather hazards in flight. By supplying more relevant weather information in a human-centered format along with the tools to generate flight plans around weather, aircraft exposure to weather hazards can be reduced. Our program directly addresses the NASA's five year investment areas of Strategic Weather Information and Weather Operations (simulation/hazard characterization and crew/dispatch/ATChazard monitoring, display, and decision support) (NASA Aeronautics Safety Investment Strategy: Weather Investment Recommendations, April 15, 1997). This program is comprised of two phases, Phase I concluded December 31, 1998. This first phase defined weather data requirements, lateral routing algorithms, an conceptual displays for a user-centered design. Phase II runs from January 1999 through September 1999. The second phase integrates vertical routing into the lateral optimizer and combines the user interface into a prototype software testbed. Phase II concludes with a dispatcher and pilot evaluation of the route optimizer decision aid. This document describes work completed in Phase I in contract with NASA Langley August 1998 - December 1998. This report includes: (1) Discuss how weather hazards were identified in partnership with experts, and how weather hazards were prioritized; (2) Static representations of display layouts for integrated planning function (3) Cost function for the 2D route optimizer; (4) Discussion of the method for obtaining, access to raw data of, and the results of the flight deck user information requirements definition; (5) Itemized display format requirements identified for representing weather hazards in a route planning aid.

  3. Implementing program-wide awareness about recovery in a large mental health and addictions program.

    PubMed

    McVanel-Viney, Sarah; Younger, Jodi; Doyle, Winnie; Kirkpatrick, Helen

    2006-01-01

    St. Joseph's Healthcare Hamilton conceptualized a multi-step plan for implementing a recovery oriented service delivery approach within their Mental Health and Addictions Program. This brief report discusses the first phase of this plan which included building awareness of recovery utilizing Anthony's (2000) system standards to develop a needs assessment for managers and senior team members. The survey had three purposes: to increase managers' awareness about recovery; to allow managers to express concerns that they had with this paradigm; and to afford managers an opportunity to explore the ways in which their service was and was not operating in a recovery oriented way. Initiatives designed to build awareness throughout the program are discussed.

  4. Constructing a modern cytology laboratory: A toolkit for planning and design.

    PubMed

    Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A

    2013-01-01

    Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction phase. The project fitted out a total of 9,000 square feet; 4,000 laboratory and 5,000 office/support. Lab space includes areas for Prep, CT screening, sign out and Imaging. Adjacent space houses faculty offices and conferencing facilities. Transportation time was reduced (waste removal) by a Pneumatic Tube System, specimen drop window to Prep Lab and a pass thru window to the screening area. Open screening and prep areas allow visual management control. Efficiencies were gained by ergonomically placing CT Manual and Imaging microscopes and computers in close proximity, also facilitating a paperless workflow for additional savings. Logistically, closer proximity to Surgical Pathology maximized the natural synergies between the areas. Lab construction should be a systematic process based on sound principles for safety, high quality testing, and finance. Our detailed planning and design process can be a model for others undertaking similar projects.

  5. Constructing a modern cytology laboratory: A toolkit for planning and design

    PubMed Central

    Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A.

    2013-01-01

    Introduction: Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. Methods: The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction phase. Results: The project fitted out a total of 9,000 square feet; 4,000 laboratory and 5,000 office/support. Lab space includes areas for Prep, CT screening, sign out and Imaging. Adjacent space houses faculty offices and conferencing facilities. Transportation time was reduced (waste removal) by a Pneumatic Tube System, specimen drop window to Prep Lab and a pass thru window to the screening area. Open screening and prep areas allow visual management control. Efficiencies were gained by ergonomically placing CT Manual and Imaging microscopes and computers in close proximity, also facilitating a paperless workflow for additional savings. Logistically, closer proximity to Surgical Pathology maximized the natural synergies between the areas. Conclusions: Lab construction should be a systematic process based on sound principles for safety, high quality testing, and finance. Our detailed planning and design process can be a model for others undertaking similar projects PMID:23599722

  6. Enabling propulsion materials for high-speed civil transport engines

    NASA Technical Reports Server (NTRS)

    Stephens, Joseph R.; Herbell, Thomas P.

    1992-01-01

    NASA Headquarters and LeRC have advocated an Enabling Propulsion Materials Program (EPM) to begin in FY-92. The High Speed Research Phase 1 program which began in FY-90 has focused on the environmental acceptability of a High Speed Civil Transport (HSCT). Studies by industry, including Boeing, McDonnell Douglas, GE Aircraft Engines, and Pratt & Whitney Aircraft, and in-house studies by NASA concluded that NO(x) emissions and airport noise reduction can only be economically achieved by revolutionary advancements in materials technologies. This is especially true of materials for the propulsion system where the combustor is the key to maintaining low emissions, and the exhaust nozzle is the key to reducing airport noise to an acceptable level. Both of these components will rely on high temperature composite materials that can withstand the conditions imposed by commercial aircraft operations. The proposed EPM program will operate in conjunction with the HSR Phase 1 Program and the planned HSR Phase 2 program slated to start in FY-93. Components and subcomponents developed from advanced materials will be evaluated in the HSR Phase 2 Program.

  7. 1980 ASEAN programme roundup: a model in the making.

    PubMed

    1981-01-01

    Association of Southeast Asian Nations (ASEAN) experts and heads of national population programs held their 4th meeting in Singapore from November 24-28, 1980. Program heads resolved to take steps to link their national activities in the population field with those of the ASEAN Population Program and carry out studies and a joint programming exercise in 1981. Progress reports on the following Phase 1 projects were given: 1) integration of population and rural development policies and programs in ASEAN countries including Indonesia, Malaysia, Philippines, Singapore, and Thailand; 2) development of an inter-country modular training program for personnel in population and rural development; 3) multi-media support for population programs in the context of rural development in ASEAN countries; 4) utilization of research findings in population and family planning for policy formulation and program management in ASEAN countries; and 5) migration in relation to rural development. Phase 2 projects approved by ASEAN country participants were also discussed: 1) institutional development and exchange of personnel, 2) women in development, 3) developing and strengthening national population information systems and networks in ASEAN countries, 4) population and development dynamics and the man/resource balance, 5) studies on health and family planning in ASEAN countries, 6) population migration movement and development, and 7) development of ASEAN social indicators.

  8. Automotive Stirling engine Market and Industrial Readiness Program (MIRP), phase 1

    NASA Astrophysics Data System (ADS)

    1982-05-01

    A program, begun in 1978, has the goal of transferring Stirling engine technology from United Stirling of Sweden to the US and, then, following design, fabrication, and prototype testing, to secure US manufacturers for the engine. The ultimate objective is the large-scale commercial use of the Automotive Stirling Engine (ASE) by the year 2000. The fist phase of the Market and Industrial Readiness Program for the ASE was concerned with defining the market, product, economic and technical factors necessary to be addressed to assure a reasonable chance of ultimate commercial acceptance. Program results for this first phase are reported and discussed. These results pertain to licensing strategy development, economic analysis, market factors, product planning, market growth, cost studies, and engine performance as measured by fuel economy using conventional fuels and by vehicle speed and acceleration characteristics.

  9. New York State Appalachian Resource Studies; Recreation and Culture, Phase I: Inventory.

    ERIC Educational Resources Information Center

    Williams, Henry G., Jr.; Belden, William M.

    On August 18, 1965, some 13 counties of southern New York State were declared eligible for participation in the Appalachian Regional Development Program. Another county was added in 1967. Initial state responsibility of the Office of Planning Coordination centered on formulation of a comprehensive development plan for the 11,858-square-mile…

  10. ALS rocket engine combustion devices design and demonstration

    NASA Technical Reports Server (NTRS)

    Arreguin, Steve

    1989-01-01

    Work performed during Phase one is summarized and the significant technical and programmatic accomplishments occurring during this period are documented. Besides a summary of the results, methodologies, trade studies, design, fabrication, and hardware conditions; the following are included: the evolving Maintainability Plan, Reliability Program Plan, Failure Summary and Analysis Report, and the Failure Mode and Effect Analysis.

  11. Final safety analysis report for the Ground Test Accelerator (GTA), Phase 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-10-01

    This document is the second volume of a 3 volume safety analysis report on the Ground Test Accelerator (GTA). The GTA program at the Los Alamos National Laboratory (LANL) is the major element of the national Neutral Particle Beam (NPB) program, which is supported by the Strategic Defense Initiative Office (SDIO). A principal goal of the national NPB program is to assess the feasibility of using hydrogen and deuterium neutral particle beams outside the Earth`s atmosphere. The main effort of the NPB program at Los Alamos concentrates on developing the GTA. The GTA is classified as a low-hazard facility, exceptmore » for the cryogenic-cooling system, which is classified as a moderate-hazard facility. This volume consists of failure modes and effects analysis; accident analysis; operational safety requirements; quality assurance program; ES&H management program; environmental, safety, and health systems critical to safety; summary of waste-management program; environmental monitoring program; facility expansion, decontamination, and decommissioning; summary of emergency response plan; summary plan for employee training; summary plan for operating procedures; glossary; and appendices A and B.« less

  12. Solar power satellite system definition study, phase 2. Part 1: Midterm briefing

    NASA Technical Reports Server (NTRS)

    1979-01-01

    An overview of the program plan for the Solar Power Satellite Program is given. Progress in the microwave power transmission system is reported. A description is given of the following: (1) launch and recovery site facilities, systems and operations; (2) cargo packaging; (3) earth-to-LEO cargo transportation operations; (4) LEO-to-GEO cargo transportation operations; (5) personnel transportation operations; (6) space vehicles in-space maintenance operations; and (7) SPS maintenance systems and operations. Other topics discussed include GEO base operations, satellite construction operations, intra-base logistics, and GEO base definition. A research and program plan is presented along with cost estimates.

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fulle, D.J.; Bilello, M.A.; Armstrong, J.A.

    The US Trade and Development Agency is partially funding the initial phase of an ambient air quality monitoring program for the Metropolitan Municipality of Istanbul in Turkey. The objectives of the monitoring program are fourfold: (1) to ascertain existing levels of air pollution within the urban area; (2) to identify locations where there may be health concerns associated with existing levels of air pollution; (3) to determine the portion of air pollution arising from specific anthropogenic sources within the urban area; and (4) to target the major sources for an emission-reduction program. This program is being carried out in phases.more » A feasibility study has recently been completed. This initial activity will be followed by three main program phases. Phase 1 will involve the installation of several air quality monitoring stations to collect area-wide background data within and surrounding the Municipality. Phase 2 will consist of taking detailed pollutant measurements near specific sources and in specific areas of high pollutant concentrations identified in Phase 1. Phase 3 would target the major sources for emission reductions to improve local air quality and would institute revisions to the existing air quality permitting program. The feasibility study included determining the pollutants of concern, specifying the equipment that should be utilized in Phase 1 for the collection of the data, recommending the number and location of sites where data should be collected, determining site preparation and security needs, and defining the data reduction and analysis techniques which should be employed. This paper describes the results of the feasibility study and outlines plans for the remaining phases of the program.« less

  14. An expert system based software sizing tool, phase 2

    NASA Technical Reports Server (NTRS)

    Friedlander, David

    1990-01-01

    A software tool was developed for predicting the size of a future computer program at an early stage in its development. The system is intended to enable a user who is not expert in Software Engineering to estimate software size in lines of source code with an accuracy similar to that of an expert, based on the program's functional specifications. The project was planned as a knowledge based system with a field prototype as the goal of Phase 2 and a commercial system planned for Phase 3. The researchers used techniques from Artificial Intelligence and knowledge from human experts and existing software from NASA's COSMIC database. They devised a classification scheme for the software specifications, and a small set of generic software components that represent complexity and apply to large classes of programs. The specifications are converted to generic components by a set of rules and the generic components are input to a nonlinear sizing function which makes the final prediction. The system developed for this project predicted code sizes from the database with a bias factor of 1.06 and a fluctuation factor of 1.77, an accuracy similar to that of human experts but without their significant optimistic bias.

  15. 40 CFR 300.315 - Phase IV-Documentation and cost recovery.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... scientific understanding of the environment and for research and development of improved response methods and...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES...

  16. 40 CFR 300.315 - Phase IV-Documentation and cost recovery.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES... scientific understanding of the environment and for research and development of improved response methods and...

  17. Curriculum-Integrated Information Literacy (CIIL) in a Community College Nursing Program: A Practical Model

    ERIC Educational Resources Information Center

    Argüelles, Carlos

    2016-01-01

    This article describes a strategy to integrate information literacy into the curriculum of a nursing program in a community college. The model is articulated in four explained phases: preparatory, planning, implementation, and evaluation. It describes a collaborative process encouraging librarians to work with nursing faculty, driving students to…

  18. National Renewable Energy Laboratory To Reduce Staff

    Science.gov Websites

    employees. The reduction will occur in two phases. The first phase will be a Voluntary Separation Program to partners in industry and universities," said NREL Director Dr. Charles Gay. "Congressional budget mitigation of future staff reductions. NREL's work force reductions will be guided by a plan submitted to the

  19. The commercial evolution of the Titan program

    NASA Astrophysics Data System (ADS)

    Isakowitz, Steven

    1988-07-01

    The present status evaluation of proprietary efforts to turn the once exclusively government-requirements-oriented Titan launch vehicle into a successful commercial competitor is divided into three phases. The first phase notes recent changes in U.S. space transportation policy and the Titan configurations evaluated for commercial feasibility. The second phase is a development history for the current vehicle's marketing organization and the right-to-use agreement for a launch site. Phase three projects the prospective marketing climate for a commercial Titan vehicle and its planned improvements.

  20. Direct Loans. An Assessment of the Clinton Administration's Proposals and Some Suggestions for Improvement. AGB Public Policy Series, No. 93-1.

    ERIC Educational Resources Information Center

    Hauptman, Arthur M.

    1993-01-01

    In 1992 the Clinton Administration proposed phasing out the federally guaranteed student loan program and replacing it with a direct lending program run entirely by the federal government, claiming that this approach would save taxpayer money and simplify a complex program. Opponents of the Administration plan argued instead for changes in federal…

  1. Compatibility Grab Sampling and Analysis Plan for FY 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SASAKI, L.M.

    1999-12-29

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for grab samples obtained to address waste compatibility. It is written in accordance with requirements identified in Data Quality Objectives for Tank Farms Waste Compatibility Program (Mulkey et al. 1999) and Tank Farm Waste Transfer Compatibility Program (Fowler 1999). In addition to analyses to support Compatibility, the Waste Feed Delivery program has requested that tank samples obtained for Compatibility also be analyzed to confirm the high-level waste and/or low-activity waste envelope(s) for the tank waste (Baldwin 1999). The analytical requirements tomore » confirm waste envelopes are identified in Data Quality Objectives for TWRS Privatization Phase I: Confirm Tank T is an Appropriate Feed Source for Low-Activity Waste Feed Batch X (Nguyen 1999a) and Data Quality Objectives for RPP Privatization Phase I: Confirm Tank T is an Appropriate Feed Source for High-Level Waste Feed Batch X (Nguyen 1999b).« less

  2. SU-E-T-294: Dosimetric Analysis of Planning Phase Using Overlap Volume Histogram for Respiratory Gated Radiotherapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kang, S; Kim, D; Kim, T

    2015-06-15

    Purpose: End-of-exhale (EOE) phase is generally preferred for gating window because tumor position is more reproducible. However, other gating windows might be more appropriate for dose distribution perspective. In this pilot study, we proposed to utilize overlap volume histogram (OVH) to search optimized gating window and demonstrated its feasibility. Methods: We acquired 4DCT of 10 phases for 3 lung patients (2 with a target at right middle lobe and 1 at right upper lobe). After structures were defined in every phase, the OVH of each OAR was generated to quantify the three dimensional spatial relationship between the PTV and OARsmore » (bronchus, esophagus, heart and cord etc.) at each phase. OVH tells the overlap volume of an OAR according to outward distance from the PTV. Relative overlap volume at 20 mm outward distance from the PTV (ROV-20) was also defined as a metric for measuring overlap volume and obtained. For dose calculation, 3D CRT plans were made for all phases under the same beam angles and objectives (e.g., 95% of the PTV coverage with at least 100% of the prescription dose of 50 Gy). The gating window phase was ranked according to ROV-20, and the relationship between the OVH and dose distribution at each phase was evaluated by comparing the maximum dose, mean dose, and equivalent uniform dose of OAR. Results: OVHs showed noticeable difference from phase to phase, implying it is possible to find optimal phases for gating window. For 2 out of 3 patients (both with a target at RML), maximum dose, mean dose, and EUD increased as ROV-20 increased. Conclusion: It is demonstrated that optimal phases (in dose distribution perspective) for gating window could exist and OVH can be a useful tool for determining such phases without performing dose optimization calculations in all phases. This work was supported by the Radiation Technology R&D program (No. 2013M2A2A7043498) and the Mid-career Researcher Program (2012-007883) through the National Research Foundation (NRF) funded by the Ministry of Science, ICT & Future Planning (MSIP) of Korea.« less

  3. A successful integrated project.

    PubMed

    Zheng, P

    1994-10-01

    The experiences of the Juxian County Family Planning Committee of Shandong Province, China, were discussed in terms of the integration of family planning with income generation activities in rural areas. The integrated program was initiated in 1988 with pilot programs established by the Qiaoshan Family Planning Association to develop marketable skills in carpet weaving and grass braiding in Xiazhuang Town and Qiaoshan Township. The program gave priority of admission to women with only children and those who practiced family planning. 1400 women were recruited in these factories. Other income generation programs were developed for silkworm breeding and silk reeling, woolen embroidery, and printing. High ranking officials of the China Family Planning Association commended the work in income generation and family planning in Juxian County. This recognition spurred the second phase of development by the county family planning association: the establishment of village operated factories and mills for native products. By the end of 1991, there were 26 such projects in the county and per capita income to women increased by RMB 678 yuan. In the third stage of 1992, the number of association enterprises increased to 196 with recruitment of over 18,000 reproductive age women. The programs were initiated with collective funds from farmers and villages. The 170 projects in 1992 were developed with an investment of 9.6 million yuan, of which 2.26 million yuan was from individuals (23.5%). Emphasis was placed on self-reliance and recruitment of women with one child, women with 2 daughters and tubal ligations, and family planning motivators. The consequences of the integrated program were weakening traditional customs of marriage and childbearing, improvement in socioeconomic status of women, and effective service delivery of family planning and maternal and child health care services.

  4. Solar Power Satellite Microwave Transmission and Reception

    NASA Technical Reports Server (NTRS)

    Dietz, R. H.

    1980-01-01

    Numerous analytical and experimental investigations related to SPS microwave power transmission and reception are reported. Aspects discussed include system performance, phase control, power amplifiers, radiating elements, rectenna, solid state configurations, and planned program activities.

  5. Satellite Power Systems (SPS) concept definition study. Volume 2, part 2: System engineering. [cost and programmatics

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1980-01-01

    The latest technical and programmatic developments are considered as well as expansions of the Rockwell SPS cost model covering each phase of the program through the year 2030. Comparative cost/economic analyses cover elements of the satellite, construction system, space transportation vehicles and operations, and the ground receiving station. System plans to define time phased costs and planning requirements that support major milestones through the year 2000. A special analysis is included on natural resources required to build the SPS reference configuration. An appendix contains the SPS Work Breakdown Structure and dictionary along with detail cost data sheet on each system and main element of the program. Over 200 line items address DDT&E, theoretical first unit, investment cost per satellite, and operations charges for replacement capital and normal operations and maintenance costs.

  6. Orbit transfer rocket engine technology program. Phase 2: Advanced engine study

    NASA Technical Reports Server (NTRS)

    Erickson, C.; Martinez, A.; Hines, B.

    1987-01-01

    In Phase 2 of the Advanced Engine Study, the Failure Modes and Effects Analysis (FMEA) maintenance-driven engine design, preliminary maintenance plan, and concept for space operable disconnects generated in Phase 1 were further developed. Based on the results of the vehicle contractors Orbit Transfer Vehicle (OTV) Concept Definition and System Analysis Phase A studies, minor revisions to the engine design were made. Additional refinements in the engine design were identified through further engine concept studies. These included an updated engine balance incorporating experimental heat transfer data from the Enhanced Heat Load Thrust Chamber Study and a Rao optimum nozzle contour. The preliminary maintenance plan of Phase 1 was further developed through additional studies. These included a compilation of critical component lives and life limiters and a review of the Space Shuttle Main Engine (SSME) operations and maintenance manual in order to begin outlining the overall maintenance procedures for the Orbit Transfer Vehicle Engine and identifying technology requirements for streamlining space-based operations. Phase 2 efforts also provided further definition to the advanced fluid coupling devices including the selection and preliminary design of a preferred concept and a preliminary test plan for its further development.

  7. State geothermal commercialization programs in seven Rocky Mountain states. Semiannual progress report, July-December 1980

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lunis, B. C.; Toth, W. J.

    The activities and findings of the seven state commercialization teams participating in the Rocky Mountain Basin and Range commercialization program are described. Background information is provided; program objectives and the technical approach that is used are discussed; and the benefits of the program are described. The summary of findings is presented. Prospect identification, area development plans, site specific development analyses, time-phased project plans, the aggregated prospective geothermal energy use, and institutional analyses are discussed. Public outreach activities are covered and findings and recommendations are summarized. The commercialization activities carried out by the respective state teams are described for the following:more » Colorado, Montana, New Mexico, North Dakota, South Dakota, Utah, and Wyoming.« less

  8. Community Strategic Visioning as a Method to Define and Address Poverty: An Analysis from Select Rural Montana Communities

    ERIC Educational Resources Information Center

    Lachapelle, Paul; Austin, Eric; Clark, Daniel

    2010-01-01

    Community strategic visioning is a citizen-based planning process in which diverse sectors of a community collectively determine a future state and coordinate a plan of action. Twenty-one communities in rural Montana participated in a multi-phase poverty reduction program that culminated in a community strategic vision process. Research on this…

  9. Challenges Facing Early Phase Trials Sponsored by the National Cancer Institute: An Analysis of Corrective Action Plans to Improve Accrual

    PubMed Central

    Massett, Holly A.; Mishkin, Grace; Rubinstein, Larry; Ivy, S. Percy; Denicoff, Andrea; Godwin, Elizabeth; DiPiazza, Kate; Bolognese, Jennifer; Zwiebel, James A.; Abrams, Jeffrey S.

    2016-01-01

    Accruing patients in a timely manner represents a significant challenge to early phase cancer clinical trials. The NCI Cancer Therapy Evaluation Program analyzed 19 months of corrective action plans (CAPs) received for slow-accruing Phase 1 and 2 trials to identify slow accrual reasons, evaluate whether proposed corrective actions matched these reasons, and assess the CAP impact on trial accrual, duration, and likelihood of meeting primary scientific objectives. Of the 135 CAPs analyzed, 69 were for Phase 1 trials and 66 for Phase 2 trials. Primary reasons cited for slow accrual were safety/toxicity (Phase 1: 48%), design/protocol concerns (Phase 1: 42%, Phase 2: 33%), and eligibility criteria (Phase 1: 41%, Phase 2: 35%). The most commonly proposed corrective actions were adding institutions (Phase 1: 43%, Phase 2: 85%) and amending the trial to change eligibility or design (Phase 1: 55%, Phase 2: 44%). Only 40% of CAPs provided proposed corrective actions that matched the reasons given for slow accrual. Seventy percent of trials were closed to accrual at time of analysis (Phase 1=48; Phase 2=46). Of these, 67% of Phase 1 and 70% of Phase 2 trials met their primary objectives, but they were active three times longer than projected. Among closed trials, 24% had an accrual rate increase associated with a greater likelihood of meeting their primary scientific objectives. Ultimately, trials receiving CAPs saw improved accrual rates. Future trials may benefit from implementing CAPs early in trial lifecycles, but it may be more beneficial to invest in earlier accrual planning. PMID:27401246

  10. Results of the Workshop on Two-Phase Flow, Fluid Stability and Dynamics: Issues in Power, Propulsion, and Advanced Life Support Systems

    NASA Technical Reports Server (NTRS)

    McQuillen, John; Rame, Enrique; Kassemi, Mohammad; Singh, Bhim; Motil, Brian

    2003-01-01

    The Two-phase Flow, Fluid Stability and Dynamics Workshop was held on May 15, 2003 in Cleveland, Ohio to define a coherent scientific research plan and roadmap that addresses the multiphase fluid problems associated with NASA s technology development program. The workshop participants, from academia, industry and government, prioritized various multiphase issues and generated a research plan and roadmap to resolve them. This report presents a prioritization of the various multiphase flow and fluid stability phenomena related primarily to power, propulsion, fluid and thermal management and advanced life support; and a plan to address these issues in a logical and timely fashion using analysis, ground-based and space-flight experiments.

  11. Rotor performance characteristics from an aeroacoustic helicopter wind-tunnel test program

    NASA Technical Reports Server (NTRS)

    Hoad, D. R.; Elliott, J. W.; Orie, N. M.

    1986-01-01

    An investigation of helicopter rotor noise at model scale was conducted in the Langley 4 by 7 meter tunnel. The program described was the first of a planned three-phase project whose purpose was to examine the characteristic noise mechanism involved in main rotor/tail rotor interaction noise. This first phase was conducted with a main rotor only, in order to identify the characteristic noise generated by only the main rotor. The aerodynamic operating conditions of the rotor system were defined during the test. The acoustic data were properly referenced.

  12. Third Report of the Task Force on the Shuttle-Mir Rendezvous and Docking Missions

    NASA Technical Reports Server (NTRS)

    1994-01-01

    In May 1994, the Task Force on the Shuttle-Mir Rendezvous and Docking Missions was established by the NASA Advisory Council. Its purpose is to review Phase 1 (Shuttle-Mir) planning, training, operations, rendezvous and docking, and management and to provide interim reports containing specific recommendations to the Advisory Council. Phase 1 represents the building block to create the experience and technical expertise for an International Space Station. The Phase 1 program brings together the United States and Russia in a major cooperative and contractual program that takes advantage of both countries' capabilities. The content of the Phase 1 program consists of the following elements as defined by the Phase 1 Program Management Plan, dated October 6, 1994: Shuttle-Mir rendezvous and docking missions; astronaut long duration presence on Mir Requirements for Mir support of Phase 1 when astronauts are not on board; outfitting Spektr and Priroda modules with NASA science, research, and risk mitigation equipment Related ground support requirements of NASA and the Russian Space Agency (RSA) to support Phase 1 Integrated NASA and RSA launch schedules and manifests The first meeting of the Task Force was held at the Johnson Space Center (JSC) on May 24 and 25, 1994 with a preliminary report submitted to the NASA Advisory Council on June 6, 1994. The second meeting of the Task Force was held at JSC on July 12 and 13, 1994 and a detailed report containing a series of specific recommendations was submitted on July 29, 1994. This report reflects the results of the third Task Force meeting which was held at JSC on 11 and 12 October, 1994. The briefings presented at that meeting reviewed NASA's response to the Task Force recommendations made to date and provided background data and current status on several critical areas which the Task Force had not addressed in its previous reports.

  13. The tug-of-war: fidelity versus adaptation throughout the health promotion program life cycle.

    PubMed

    Bopp, Melissa; Saunders, Ruth P; Lattimore, Diana

    2013-06-01

    Researchers across multiple fields have described the iterative and nonlinear phases of the translational research process from program development to dissemination. This process can be conceptualized within a "program life cycle" framework that includes overlapping and nonlinear phases: development, adoption, implementation, maintenance, sustainability or termination, and dissemination or diffusion, characterized by tensions between fidelity to the original plan and adaptation for the setting and population. In this article, we describe the life cycle (phases) for research-based health promotion programs, the key influences at each phase, and the issues related to the tug-of-war between fidelity and adaptation throughout the process using a fictionalized case study based on our previous research. This article suggests the importance of reconceptualizing intervention design, involving stakeholders, and monitoring fidelity and adaptation throughout all phases to maintain implementation fidelity and completeness. Intervention fidelity should be based on causal mechanisms to ensure effectiveness, while allowing for appropriate adaption to ensure maximum implementation and sustainability. Recommendations for future interventions include considering the determinants of implementation including contextual factors at each phase, the roles of stakeholders, and the importance of developing a rigorous, adaptive, and flexible definition of implementation fidelity and completeness.

  14. NASA's Plans for Developing Life Support and Environmental Monitoring and Control Systems

    NASA Technical Reports Server (NTRS)

    Lawson, B. Michael; Jan, Darrell

    2006-01-01

    Life Support and Monitoring have recently been reworked in response to the Vision for Space Exploration. The Exploration Life Support (ELS) Project has replaced the former Advanced Life Support Element of the Human Systems Research and Technology Office. Major differences between the two efforts include: the separation of thermal systems into a new stand alone thermal project, deferral of all work in the plant biological systems, relocation of food systems to another organization, an addition of a new project called habitation systems, and overall reduction in the number of technology options due to lower funding. The Advanced Environmental Monitoring and Control (AEMC) Element is retaining its name but changing its focus. The work planned in the ELS and AEMC projects is organized around the three major phases of the Exploration Program. The first phase is the Crew Exploration Vehicle (CEV). The ELS and AEMC projects will develop hardware for this short duration orbital and trans-lunar vehicle. The second phase is sortie landings on the moon. Life support hardware for lunar surface access vehicles including upgrades of the CEV equipment and technologies which could not be pursued in the first phase due to limited time and budget will be developed. Monitoring needs will address lunar dust issues, not applicable to orbital needs. The ELS and AEMC equipment is of short duration, but has different environmental considerations. The third phase will be a longer duration lunar outpost. This will consist of a new set of hardware developments better suited for long duration life support and associated monitoring needs on the lunar surface. The presentation will show the planned activities and technologies that are expected to be developed by the ELS and AEMC projects for these program phases.

  15. Sustainability in Health care by Allocating Resources Effectively (SHARE) 5: developing a model for evidence-driven resource allocation in a local healthcare setting.

    PubMed

    Harris, Claire; Allen, Kelly; Waller, Cara; Green, Sally; King, Richard; Ramsey, Wayne; Kelly, Cate; Thiagarajan, Malar

    2017-05-10

    This is the fifth in a series of papers reporting Sustainability in Health care by Allocating Resources Effectively (SHARE) in a local healthcare setting. This paper synthesises the findings from Phase One of the SHARE Program and presents a model to be implemented and evaluated in Phase Two. Monash Health, a large healthcare network in Melbourne Australia, sought to establish an organisation-wide systematic evidence-based program for disinvestment. In the absence of guidance from the literature, the Centre for Clinical Effectiveness, an in-house 'Evidence Based Practice Support Unit', was asked to explore concepts and practices related to disinvestment, consider the implications for a local health service and identify potential settings and methods for decision-making. Mixed methods were used to capture the relevant information. These included literature reviews; online questionnaire, interviews and structured workshops with a range of stakeholders; and consultation with experts in disinvestment, health economics and health program evaluation. Using the principles of evidence-based change, the project team worked with health service staff, consumers and external experts to synthesise the findings from published literature and local research and develop proposals, frameworks and plans. Multiple influencing factors were extracted from these findings. The implications were both positive and negative and addressed aspects of the internal and external environments, human factors, empirical decision-making, and practical applications. These factors were considered in establishment of the new program; decisions reached through consultation with stakeholders were used to define four program components, their aims and objectives, relationships between components, principles that underpin the program, implementation and evaluation plans, and preconditions for success and sustainability. The components were Systems and processes, Disinvestment projects, Support services, and Program evaluation and research. A model for a systematic approach to evidence-based resource allocation in a local health service was developed. A robust evidence-based investigation of the research literature and local knowledge with a range of stakeholders resulted in rich information with strong consistent messages. At the completion of Phase One, synthesis of the findings enabled development of frameworks and plans and all preconditions for exploration of the four main aims in Phase Two were met.

  16. A Guidebook for Evaluating Programs for the Gifted in Virginia School Divisions. A Cooperative Project.

    ERIC Educational Resources Information Center

    Pulaski County Schools, VA.

    This guidebook aims to provide clear, non-technical descriptions of procedures for evaluating the effectiveness of local gifted education programs in Virginia. The procedures were developed with both external and internal evaluations in mind. The evaluation process is described in four phases: planning, collecting the data, interpreting the data…

  17. Extended-Day Kindergarten versus Half-Day Kindergarten: What One School District Decided.

    ERIC Educational Resources Information Center

    Firlik, Russell

    The New Canaan Public Schools reduced its extended-day (21 hours per week) kindergarten program to half-day sessions (15 hours per week) in an interim program during a 2-year school construction-expansion phase. During a 9-month planning process, an ad hoc committee representing equal membership of teachers and parents from three elementary…

  18. The Children's Services Delivery System in California: Preliminary Report--Phase I.

    ERIC Educational Resources Information Center

    Commission on California State Government Organization and Economy, Sacramento.

    Concerned because California now annually administers an estimated $5.9 billion in funding for children's services programs, the Little Hoover Commission initiated a study on the state's provision for children's services. This report, on Phase I of the study, identifies the extent of the problem in 23 findings and provides a plan of action in 15…

  19. Adapting and implementing an evidence-based sun-safety education program in rural Idaho, 2012.

    PubMed

    Cariou, Charlene; Gonzales, Melanie; Krebill, Hope

    2014-05-08

    Melanoma incidence and mortality rates in Idaho are higher than national averages. The importance of increased awareness of skin cancer has been cited by state and local organizations. St. Luke's Mountain States Tumor Institute (MSTI) prioritized educational outreach efforts to focus on the implementation of a skin cancer prevention program in rural Idaho. As a community cancer center, MSTI expanded cancer education services to include dedicated support to rural communities. Through this expansion, an MSTI educator sought to partner with a community organization to provide sun-safety education. MSTI selected, adapted, and implemented an evidence-based program, Pool Cool. The education program was implemented in 5 phases. In Phase I, we identified and recruited a community partner; in Phase 2, after thorough research, we selected a program, Pool Cool; in Phase 3, we planned the details of the program, including identification of desired short- and long-term outcomes and adaptation of existing program materials; in Phase 4, we implemented the program in summer 2012; in Phase 5, we assessed program sustainability and expansion. MSTI developed a sustainable partnership with Payette Municipal Pool, and in summer 2012, we implemented Pool Cool. Sun-safety education was provided to more than 700 young people aged 2 to 17 years, and educational signage and sunscreen benefitted hundreds of additional pool patrons. Community cancer centers are increasingly being asked to assess community needs and implement evidence-based prevention and screening programs. Clinical staff may become facilitators of evidence-based public health programs. Challenges of implementing evidence-based programs in the context of a community cancer centers are staffing, leveraging of resources, and ongoing training and support.

  20. Adapting and Implementing an Evidence-Based Sun-Safety Education Program in Rural Idaho, 2012

    PubMed Central

    Gonzales, Melanie; Krebill, Hope

    2014-01-01

    Background Melanoma incidence and mortality rates in Idaho are higher than national averages. The importance of increased awareness of skin cancer has been cited by state and local organizations. St. Luke’s Mountain States Tumor Institute (MSTI) prioritized educational outreach efforts to focus on the implementation of a skin cancer prevention program in rural Idaho. Community Context As a community cancer center, MSTI expanded cancer education services to include dedicated support to rural communities. Through this expansion, an MSTI educator sought to partner with a community organization to provide sun-safety education. MSTI selected, adapted, and implemented an evidence-based program, Pool Cool. Methods The education program was implemented in 5 phases. In Phase I, we identified and recruited a community partner; in Phase 2, after thorough research, we selected a program, Pool Cool; in Phase 3, we planned the details of the program, including identification of desired short- and long-term outcomes and adaptation of existing program materials; in Phase 4, we implemented the program in summer 2012; in Phase 5, we assessed program sustainability and expansion. Outcome MSTI developed a sustainable partnership with Payette Municipal Pool, and in summer 2012, we implemented Pool Cool. Sun-safety education was provided to more than 700 young people aged 2 to 17 years, and educational signage and sunscreen benefitted hundreds of additional pool patrons. Interpretation Community cancer centers are increasingly being asked to assess community needs and implement evidence-based prevention and screening programs. Clinical staff may become facilitators of evidence-based public health programs. Challenges of implementing evidence-based programs in the context of a community cancer centers are staffing, leveraging of resources, and ongoing training and support. PMID:24809363

  1. The development of rural area residence based on participatory planning case study: A rural residential area of Pucungrejo village, Magelang through "neighborhood development" program

    NASA Astrophysics Data System (ADS)

    KP, R. M. Bambang Setyohadi; Wicaksono, Dimas

    2018-03-01

    The poverty is one of the prevailing problems in Indonesia until now. Even a change of the era of governance has not succeeded in eradicating the problem of poverty. The program of poverty alleviation program has always been a focus in the budget allocation in all era of leadership in Indonesia. Those programs were strategic because it prepared the foundation of community self-reliance in the form of representative, entrenched and conducive community leadership institutions to develop of social capital of society in the future. Developing an area of the village requires an integrated planning (Grand Design) to figure out the potential and the problems existing in the rural area as well as the integration of the rural area surrounding. In addition, the grand design needs to be synchronized to the more comprehensive spatial plan with a hierarchical structure such as RTBL, RDTRK / RRTRK, RTRK, and RTRW. This rural area management plan can be oriented or refer to the pattern developed from neighborhood Development program which is part of the PNPM Mandiri program. The neighborhood development program is known as residential area development plan whose process involves of the entire community. Therefore, the regional development up to the scale of the environment requires the planning phase. Particularly, spatial planning which emphasizes the efforts to optimize sectorial development targets to be integrated into an integrated development process must be conducted, in addition to taking into consideration the opportunities, potentials and limitations of the resources, the level of interconnection with the central government within the district and between sub-districts and rural areas.

  2. From local development policies to strategic planning-Assessing continuity in institutional coalitions.

    PubMed

    Mazzeo Rinaldi, Francesco

    2016-06-01

    In the last two decades, EU policies have had a fundamental role in orienting regional/local development. The objective of this work is set in this context as it intends to analyze the local development programs activated in Sicily in the last three programming periods. The main aim is to explore whether the EU partnership principle influenced cooperation among local actors, assessing the continuity of local institutional coalition in managing different local development programs within the regional development policy system. We focus, in particular, on Strategic Plans (SP) promoted in Sicily in the transition phase between the 2000-2006 and the 2007-2013 periods. Copyright © 2016 Elsevier Ltd. All rights reserved.

  3. A randomized community trial of enhanced family planning outreach in Rakai, Uganda.

    PubMed

    Lutalo, Tom; Kigozi, Godfrey; Kimera, Edward; Serwadda, David; Wawer, Maria J; Zabin, Laurie Schwab; Gray, Ronald H

    2010-03-01

    A randomized community trial of a family planning outreach program was conducted in Rakai District, Uganda. Five communities received standard services; six intervention communities received additional family planning information, counseling, and contraceptive methods from government service providers and community-based volunteer agents using social marketing and other strategies. Condom use was promoted in all of the communities. The community-based family planning outreach program was implemented in two phases--1999-2000 (early) and 2001(late)--and its impact was evaluated by means of population surveys in 2002-03. At follow-up, hormonal contraceptive prevalence was 23 percent in the intervention communities, compared with 20 percent in the control communities. The differential was greater in the early-intervention communities than the late-intervention communities. Pregnancy rates at follow-up were 15 percent in the control and 13 percent in the intervention communities. No differentials in condom use were found between study arms. Family planning outreach via social marketing can significantly increase hormonal contraceptive use and decrease pregnancy rates, but the impact of this outreach program was modest.

  4. Terrestrial Planet Finder Interferometer Technology Status and Plans

    NASA Technical Reports Server (NTRS)

    Lawson, Perter R.; Ahmed, A.; Gappinger, R. O.; Ksendzov, A.; Lay, O. P.; Martin, S. R.; Peters, R. D.; Scharf, D. P.; Wallace, J. K.; Ware, B.

    2006-01-01

    A viewgraph presentation on the technology status and plans for Terrestrial Planet Finder Interferometer is shown. The topics include: 1) The Navigator Program; 2) TPF-I Project Overview; 3) Project Organization; 4) Technology Plan for TPF-I; 5) TPF-I Testbeds; 6) Nulling Error Budget; 7) Nulling Testbeds; 8) Nulling Requirements; 9) Achromatic Nulling Testbed; 10) Single Mode Spatial Filter Technology; 11) Adaptive Nuller Testbed; 12) TPF-I: Planet Detection Testbed (PDT); 13) Planet Detection Testbed Phase Modulation Experiment; and 14) Formation Control Testbed.

  5. Integrated surgical emergency training plan in the internship: A step toward improving the quality of training and emergency center management.

    PubMed

    Akhlaghi, Mohammad Reza; Vafamehr, Vajiheh; Dadgostarnia, Mohammad; Dehghani, Alireza

    2013-01-01

    In this study, by using a problem-oriented approach in the needs assessment, identifying the defects and deficiencies in emergency health training centers has been determined as the basis for the requirements. The main objective of the study was the implementation of surgical emergencies integration of the five surgical groups (general surgery, urology, orthopedics, neurosurgery, and ENT) to meet the needs and determining its efficacy. THIS INTERVENTIONAL STUDY WAS CONDUCTED IN THREE PHASES: (1) Phase I (design and planning): Needs assessment, recognition of implementation barriers and providing the objectives and training program for integrated emergencies. (2) Phase II (implementation): Justification of the main stakeholders of the project, preparation of students' duties in the emergency department, preparation of on-duty plans, supervising the implementation of the program, and reviewing the plan in parallel with the implementation based on the problems. (3) Phase III (evaluation): Reviewing the evidences based on the amount of efficiency of the plan and justification for its continuation. In the first and the second phase, the data were collected through holding focus group meetings and interviews. In the third phase, the opened-reply and closed-reply researcher-made questionnaires were used. The questionnaire face and content validity were confirmed by experts and the reliability was assessed by calculating the Cronbach's alpha. ACCORDING TO THE VIEWS OF THE INTERNS, ASSISTANTS, TEACHERS, AND EMERGENCY PERSONNEL, THE POSITIVE FEATURES OF THE PLAN INCLUDED THE FOLLOWING: Increasing the patients' satisfaction, reducing the patients' stay in the Emergency Department, increasing the speed of handling the patients, balancing the workloads of the interns, direct training of interns by young teachers of emergency medicine, giving the direct responsibility of the patient to the intern, practical and operational training of emergency issues, increasing the teamwork, facing a variety of patients, practicing the role of general practitioners, role-playing on a real patient's bedside, having a multilateral approach to the patient, reducing the wasting time on minor wards, balancing the work and rest schedules of the interns, and better learning and satisfaction of the interns. Over 60% of the participants believed the program has the following benefits: More attention on the training plan, improving the learning of patient management, being more responsive for the training of interns, increasing operational approach to emergency patients, being more aware of the performed actions, and increasing the quality and speed of services provided to patients. The mean score assigned to the whole questionnaire of investigating the viewpoints was 37.5 out of 50. The mean score of the interns' questionnaire was significantly more than the mean score of the assistants. The results obtained indicated that the greatest existing consensus about this plan was the positive impact on the learning of interns in the emergency setting. Thus, it will not only increase the number of patients who the interns are managing during the internship course, but also increases the balance of their workload and they can learn and manage the emergency patients with more leisure.

  6. Development of a Ground Test and Analysis Protocol to Support NASA's NextSTEP Phase 2 Habitation Concepts

    NASA Technical Reports Server (NTRS)

    Beaton, Kara H.; Chappell, Steven P.; Bekdash, Omar S.; Gernhardt, Michael L.

    2018-01-01

    The NASA Next Space Technologies for Exploration Partnerships (NextSTEP) program is a public-private partnership model that seeks commercial development of deep space exploration capabilities to support extensive human spaceflight missions around and beyond cislunar space. NASA first issued the Phase 1 NextSTEP Broad Agency Announcement to U.S. industries in 2014, which called for innovative cislunar habitation concepts that leveraged commercialization plans for low Earth orbit. These habitats will be part of the Deep Space Gateway (DSG), the cislunar space station planned by NASA for construction in the 2020s. In 2016, Phase 2 of the NextSTEP program selected five commercial partners to develop ground prototypes. A team of NASA research engineers and subject matter experts have been tasked with developing the ground test protocol that will serve as the primary means by which these Phase 2 prototype habitats will be evaluated. Since 2008, this core test team has successfully conducted multiple spaceflight analog mission evaluations utilizing a consistent set of operational products, tools, methods, and metrics to enable the iterative development, testing, analysis, and validation of evolving exploration architectures, operations concepts, and vehicle designs. The purpose of implementing a similar evaluation process for the NextSTEP Phase 2 Habitation Concepts is to consistently evaluate the different commercial partner ground prototypes to provide data-driven, actionable recommendations for Phase 3.

  7. Essentials for Team Based Rehearsals and the Differences Between Earth Orbiting and Deep Space Missions

    NASA Technical Reports Server (NTRS)

    Gomez-Rosa, Carlos; Cifuentes, Juan; Wasiak, Francis; Alfonzo, Agustin

    2015-01-01

    The mission readiness environment is where spacecraft and ground systems converge to form the entire as built flight system for the final phase of operationally-themed testing. For most space missions, this phase starts between nine to twelve months prior to the planned launch. In the mission readiness environment, the goal is to perform sufficient testing to exercise the flight teams and systems through all mission phases in order to demonstrate that all elements are ready to support. As part of the maturation process, a mission rehearsal program is introduced to focus on team processes within the final flight system, in a more realistic operational environment. The overall goal for a mission rehearsal program is to: 1) ensure all flight system elements are able to meet mission objectives as a cohesive team; 2) reduce the risk in space based operations due to deficiencies in people, processes, procedures, or systems; and 3) instill confidence in the teams that will execute these first time flight activities. A good rehearsal program ensures critical events are exercised, discovers team or flight system nuances whose impact were previously unknown, and provides a real-time environment in which to interact with the various teams and systems. For flight team members, the rehearsal program provides experience and training in the event of planned (or unplanned) flight contingencies. To preserve the essence for team based rehearsals, this paper will explore the important elements necessary for a successful rehearsal program, document differences driven by Earth Orbiting (Aqua, Aura, Suomi-National Polar-orbiting Partnership (NPP)) and Deep Space missions (New Horizons, Mars Atmosphere and Volatile EvolutioN (MAVEN)) and discuss common challenges to both mission types. In addition, large scale program considerations and enhancements or additional steps for developing a rehearsal program will also be considered. For NASA missions, the mission rehearsal phase is a key milestone for predicting and ensuring on-orbit success.

  8. Congestion management system/IVHS program study Birmingham, Alabama : phase 1, report

    DOT National Transportation Integrated Search

    1995-04-01

    The Inter-modal Surface Transportation Efficiency Act of 1991 (ISTEA) required states and : metropolitan areas designated as transportation management areas develop congestion : management systems. The Birmingham Planning Area is designated as a non-...

  9. Congestion Management System/IVHS Program Study for Birmingham, Alabama. Phase 1 Report

    DOT National Transportation Integrated Search

    1995-04-01

    The Inter-modal Surface Transportation Efficiency Act of 1991 (ISTEA) required states and : metropolitan areas designated as transportation management areas develop congestion : management systems. The Birmingham Planning Area is designated as a non-...

  10. Finding the Funds for Technology.

    ERIC Educational Resources Information Center

    Wodarz, Nan

    1996-01-01

    Describes strategies to meet the increasing demands for technological innovation in the face of increasingly severe budgetary constraints. Long-term planning is the key to a successful technological program. Describes the options of leasing, financing, and phased-in purchases. (LMI)

  11. Integrated corridor management initiative : demonstration phase evaluation, Dallas air quality test plan.

    DOT National Transportation Integrated Search

    1997-09-26

    Appendices A & B of the "Implementation of the National Intelligent Transportation Systems Program", a report forwarded to Congress according to Section 6054(c) of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA).

  12. CPAS Preflight Drop Test Analysis Process

    NASA Technical Reports Server (NTRS)

    Englert, Megan E.; Bledsoe, Kristin J.; Romero, Leah M.

    2015-01-01

    Throughout the Capsule Parachute Assembly System (CPAS) drop test program, the CPAS Analysis Team has developed a simulation and analysis process to support drop test planning and execution. This process includes multiple phases focused on developing test simulations and communicating results to all groups involved in the drop test. CPAS Engineering Development Unit (EDU) series drop test planning begins with the development of a basic operational concept for each test. Trajectory simulation tools include the Flight Analysis and Simulation Tool (FAST) for single bodies, and the Automatic Dynamic Analysis of Mechanical Systems (ADAMS) simulation for the mated vehicle. Results are communicated to the team at the Test Configuration Review (TCR) and Test Readiness Review (TRR), as well as at Analysis Integrated Product Team (IPT) meetings in earlier and intermediate phases of the pre-test planning. The ability to plan and communicate efficiently with rapidly changing objectives and tight schedule constraints is a necessity for safe and successful drop tests.

  13. Design, fabrication, test, qualification and price analysis for third generation design solar cell modules

    NASA Technical Reports Server (NTRS)

    1980-01-01

    An updated program plan is presented showing the task descriptions depicting the work, progress, achievements, and the cause of any deviations from the original plan (SC-1), and how this impacted on the original schedule of the program. In addition there is an update documenting all design alterations made during the pre-production phase and a complete up to date set of engineering and manufacturing documentation (CM-1). The purpose of the work in the original plan was to explore, design, develop, test, and deliver 1000 watts of prototype flat plate, photovoltaic modules appropriate for use in applications in the 20 to 500 kilowatt range and which show potential for meeting the 1986 cost goals.

  14. The impact of health reform on the Medicare Advantage program: realigning payment with performance.

    PubMed

    Biles, Brian; Casillas, Giselle; Arnold, Grace; Guterman, Stuart

    2012-10-01

    The Affordable Care Act enacts a new payment system for private health plans available to Medicare beneficiaries through the Medicare Advantage (MA) program. The system, which is being phased in through 2017, aims to (1) reduce the excess pay­ments received by private plans relative to per capita spending in traditional Medicare, and (2) reward plans that earn high performance ratings. Using 2009 data, this issue brief pres­ents analysis of the distributional impact on MA plan payments of these new policies as if they had been fully implemented in that year. We find that, when the polices [sic] are in place, they will bring overall MA plan payments nationwide down from 114 percent to 102 per­cent of what spending would have been for the same enrollees if they had been enrolled in traditional Medicare. While payments will vary across the nation, high-performing MA plans stand to benefit from this new arrangement.

  15. New bounding and decomposition approaches for MILP investment problems: Multi-area transmission and generation planning under policy constraints

    DOE PAGES

    Munoz, F. D.; Hobbs, B. F.; Watson, J. -P.

    2016-02-01

    A novel two-phase bounding and decomposition approach to compute optimal and near-optimal solutions to large-scale mixed-integer investment planning problems is proposed and it considers a large number of operating subproblems, each of which is a convex optimization. Our motivating application is the planning of power transmission and generation in which policy constraints are designed to incentivize high amounts of intermittent generation in electric power systems. The bounding phase exploits Jensen’s inequality to define a lower bound, which we extend to stochastic programs that use expected-value constraints to enforce policy objectives. The decomposition phase, in which the bounds are tightened, improvesmore » upon the standard Benders’ algorithm by accelerating the convergence of the bounds. The lower bound is tightened by using a Jensen’s inequality-based approach to introduce an auxiliary lower bound into the Benders master problem. Upper bounds for both phases are computed using a sub-sampling approach executed on a parallel computer system. Numerical results show that only the bounding phase is necessary if loose optimality gaps are acceptable. But, the decomposition phase is required to attain optimality gaps. Moreover, use of both phases performs better, in terms of convergence speed, than attempting to solve the problem using just the bounding phase or regular Benders decomposition separately.« less

  16. New bounding and decomposition approaches for MILP investment problems: Multi-area transmission and generation planning under policy constraints

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Munoz, F. D.; Hobbs, B. F.; Watson, J. -P.

    A novel two-phase bounding and decomposition approach to compute optimal and near-optimal solutions to large-scale mixed-integer investment planning problems is proposed and it considers a large number of operating subproblems, each of which is a convex optimization. Our motivating application is the planning of power transmission and generation in which policy constraints are designed to incentivize high amounts of intermittent generation in electric power systems. The bounding phase exploits Jensen’s inequality to define a lower bound, which we extend to stochastic programs that use expected-value constraints to enforce policy objectives. The decomposition phase, in which the bounds are tightened, improvesmore » upon the standard Benders’ algorithm by accelerating the convergence of the bounds. The lower bound is tightened by using a Jensen’s inequality-based approach to introduce an auxiliary lower bound into the Benders master problem. Upper bounds for both phases are computed using a sub-sampling approach executed on a parallel computer system. Numerical results show that only the bounding phase is necessary if loose optimality gaps are acceptable. But, the decomposition phase is required to attain optimality gaps. Moreover, use of both phases performs better, in terms of convergence speed, than attempting to solve the problem using just the bounding phase or regular Benders decomposition separately.« less

  17. 10 kW SOFC Power System Commercialization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dan Norrick; Brad Palmer; Charles Vesely

    2006-02-01

    Cummins Power Generation (CPG) as the prime contractor and SOFCo-EFS Holdings LLC (SOFCo), as their subcontractor, teamed under the Solid-state Energy Conversion Alliance (SECA) program to develop 3-10kW solid oxide fuel cell systems for use in recreational vehicles, commercial work trucks and stand-by telecommunications applications. The program goal is demonstration of power systems that meet commercial performance requirements and can be produced in volume at a cost of $400/kW. This report summarizes the team's activities during the seventh six-month period (July-December 2005) of the four-year Phase I effort. While there has been significant progress in the development of the SOFCmore » subsystems that can support meeting the program Phase 1 goals, the SOFCo ceramic stack technology has progressed significantly slower than plan and CPG consider it unlikely that the systemic problems encountered will be overcome in the near term. SOFCo has struggled with a series of problems associated with inconsistent manufacturing, inadequate cell performance, and the achievement of consistent, durable, low resistance inter-cell connections with reduced or no precious materials. A myriad of factors have contributed to these problems, but the fact remains that progress has not kept pace with the SECA program. A contributing factor in SOFCo's technical difficulties is attributed to their significantly below plan industry cost share spending over the last four years. This has resulted in a much smaller SOFC stack development program, has contributed to SOFCo not being able to aggressively resolve core issues, and clouds their ability to continue into a commercialization phase. In view of this situation, CPG has conducted an independent assessment of the state-of-the-art in planar SOFC's stacks and have concluded that alternative technology exists offering the specific performance, durability, and low cost needed to meet the SECA objectives. We have further concluded that there is insufficient evidence to reliably predict that SOFCo will be able to achieve the SECA performance and cost goals on a schedule consistent with SECA or CPG commercialization goals. CPG believes SOFCo have made a good faith effort consistent with the available resources, but have repeatedly fallen short of achieving the programs scheduled targets. CPG has therefore initiated a process of application for extension of Phase 1 of our SECA program with the intent of transitioning to an alternative stack supplier with more mature SOFC technology, and demonstrating a system meeting the SECA Phase 1 goals by the end of calendar 2006. We have identified an alternative supplier and will be reporting the progress on transition and program planning in monthly technical reports, reviews, and in the next semiannual report.« less

  18. Challenges Facing Early Phase Trials Sponsored by the National Cancer Institute: An Analysis of Corrective Action Plans to Improve Accrual.

    PubMed

    Massett, Holly A; Mishkin, Grace; Rubinstein, Larry; Ivy, S Percy; Denicoff, Andrea; Godwin, Elizabeth; DiPiazza, Kate; Bolognese, Jennifer; Zwiebel, James A; Abrams, Jeffrey S

    2016-11-15

    Accruing patients in a timely manner represents a significant challenge to early phase cancer clinical trials. The NCI Cancer Therapy Evaluation Program analyzed 19 months of corrective action plans (CAP) received for slow-accruing phase I and II trials to identify slow accrual reasons, evaluate whether proposed corrective actions matched these reasons, and assess the CAP impact on trial accrual, duration, and likelihood of meeting primary scientific objectives. Of the 135 CAPs analyzed, 69 were for phase I trials and 66 for phase II trials. Primary reasons cited for slow accrual were safety/toxicity (phase I: 48%), design/protocol concerns (phase I: 42%, phase II: 33%), and eligibility criteria (phase I: 41%, phase II: 35%). The most commonly proposed corrective actions were adding institutions (phase I: 43%, phase II: 85%) and amending the trial to change eligibility or design (phase I: 55%, phase II: 44%). Only 40% of CAPs provided proposed corrective actions that matched the reasons given for slow accrual. Seventy percent of trials were closed to accrual at time of analysis (phase I = 48; phase II = 46). Of these, 67% of phase I and 70% of phase II trials met their primary objectives, but they were active three times longer than projected. Among closed trials, 24% had an accrual rate increase associated with a greater likelihood of meeting their primary scientific objectives. Ultimately, trials receiving CAPs saw improved accrual rates. Future trials may benefit from implementing CAPs early in trial life cycles, but it may be more beneficial to invest in earlier accrual planning. Clin Cancer Res; 22(22); 5408-16. ©2016 AACRSee related commentary by Mileham and Kim, p. 5397. ©2016 American Association for Cancer Research.

  19. Vital signs monitoring plan for the Klamath Network: Phase I report

    USGS Publications Warehouse

    Sarr, Daniel; Odion, Dennis; Truitt, Robert E.; Beever, Erik A.; Shafer, Sarah; Duff, Andrew; Smith, Sean B.; Bunn, Windy; Rocchio, Judy; Sarnat, Eli; Alexander, John; Jessup, Steve

    2004-01-01

    This report chronicles the Phase 1 stage of the vital signs monitoring program for the Klamath Network. It consists of two chapters and eleven appendixes. The purposes of Chapter One are to 1) describe the network administrative structure and approach to planning; 2) introduce the Klamath Network parks, their resources, and environmental settings; 3) explain the need for monitoring changes in resources and supporting environments; 4) identify key information gaps that limit understanding of how to best achieve these monitoring goals. The purpose of Chapter Two is to develop the descriptive information provided in Chapter One into a conceptual basis for vital signs monitoring and to present the Network’s initial suite of conceptual models. The Report Appendices provide in-depth information on a variety of topics researched in preparation of the report, including: detailed natural resource profiles for each park, supporting policies and guidelines, regional fire regimes, vegetation types of the parks, exotic species threats, interagency monitoring programs, air issues, water quality (Phase 1 Report), Network vital signs (Scoping Summary Report), rare species, and rare habitats of the parks.

  20. Program status

    NASA Technical Reports Server (NTRS)

    Smith, P.

    1986-01-01

    The Pilot Climate Data System (PCDS) was designed to support a variety of users that have been arbitrarily categorized into four groups: researchers, data producers, occasional users, and management. The expanding capabilities of the system are attracting the attention of both academic and other scientific institutions worldwide. Highlighted by progress in networking capabilities, hardware acquisitions, software developments, data set additions, and tutorial developments, exciting advances have taken place since the First PCDS Workshop. In the plans for the 1986 fiscal year, recommendations from an ad hoc users' group meeting in May 1985 and from the First PCDS workshop are apparent. This year's plans are listed, along with comments made at the users' group meeting. Although the PCDS is presently considered to be in a developmental phase, plans for making the transition to an operational phase are being implemented.

  1. SU-E-T-562: Motion Tracking Optimization for Conformal Arc Radiotherapy Plans: A QUASAR Phantom Based Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Xu, Z; Wang, I; Yao, R

    Purpose: This study is to use plan parameters optimization (Dose rate, collimator angle, couch angle, initial starting phase) to improve the performance of conformal arc radiotherapy plans with motion tracking by increasing the plan performance score (PPS). Methods: Two types of 3D conformal arc plans were created based on QUASAR respiratory motion phantom with spherical and cylindrical targets. Sinusoidal model was applied to the MLC leaves to generate motion tracking plans. A MATLAB program was developed to calculate PPS of each plan (ranges from 0–1) and optimize plan parameters. We first selected the dose rate for motion tracking plans andmore » then used simulated annealing algorithm to search for the combination of the other parameters that resulted in the plan of the maximal PPS. The optimized motion tracking plan was delivered by Varian Truebeam Linac. In-room cameras and stopwatch were used for starting phase selection and synchronization between phantom motion and plan delivery. Gaf-EBT2 dosimetry films were used to measure the dose delivered to the target in QUASAR phantom. Dose profiles and Truebeam trajectory log files were used for plan delivery performance evaluation. Results: For spherical target, the maximal PPS (PPSsph) of the optimized plan was 0.79: (Dose rate: 500MU/min, Collimator: 90°, Couch: +10°, starting phase: 0.83π). For cylindrical target, the maximal PPScyl was 0.75 (Dose rate: 300MU/min, Collimator: 87°, starting phase: 0.97π) with couch at 0°. Differences of dose profiles between motion tracking plans (with the maximal and the minimal PPS) and 3D conformal plans were as follows: PPSsph=0.79: %ΔFWHM: 8.9%, %Dmax: 3.1%; PPSsph=0.52: %ΔFWHM: 10.4%, %Dmax: 6.1%. PPScyl=0.75: %ΔFWHM: 4.7%, %Dmax: 3.6%; PPScyl=0.42: %ΔFWHM: 12.5%, %Dmax: 9.6%. Conclusion: By achieving high plan performance score through parameters optimization, we can improve target dose conformity of motion tracking plan by decreasing total MLC leaf travel distance and leaf speed.« less

  2. Structural assembly demonstration experiment, phase 1

    NASA Astrophysics Data System (ADS)

    Akin, David L.; Bowden, Mary L.; Miller, Rene H.

    1983-03-01

    The goal of this phase of the structural assembly and demonstration experiment (SADE) program was to begin to define a shuttle flight experiment that would yield data to compare on-orbit assembly operations of large space structures with neutral buoyancy simulations. In addition, the experiment would be an early demonstration of structural hardware and human capabilities in extravehicular activity (EVA). The objectives of the MIT study, as listed in the statement of work, were: to provide support in establishing a baseline neutral buoyancy testing data base, to develop a correlation technique between neutral buoyancy test results and on-orbit operations, and to prepare the SADE experiment plan (MSFC-PLAN-913).

  3. Modular space station phase B extension period executive summary

    NASA Technical Reports Server (NTRS)

    Tischler, A. A.; Could, C. L.

    1972-01-01

    A narrative summary is presented of technical, programmatic, and planning information developed during the space station definition study extension period. The modular space station is emphasized, but tasks pertaining to shuttle sorties missions and information management advanced development are included. A series of program options considering technical, schedule, and programmatic alternatives to the baseline program are defined and evaluated.

  4. Deutsch Durch Audio-Visuelle Methode: An Audio-Lingual-Oral Approach to the Teaching of German.

    ERIC Educational Resources Information Center

    Dickinson Public Schools, ND. Instructional Media Center.

    This teaching guide, designed to accompany Chilton's "Deutsch Durch Audio-Visuelle Methode" for German 1 and 2 in a three-year secondary school program, focuses major attention on the operational plan of the program and a student orientation unit. A section on teaching a unit discusses four phases: (1) presentation, (2) explanation, (3)…

  5. System configuration management plan for 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vargo, G.F. Jr.

    1994-10-11

    The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less

  6. Alvarado Flood Risk Management Modifications to Existing Project Section 408 Review. Review Plan

    DTIC Science & Technology

    2012-12-26

    Digital Flood Insurance Rate Maps) through the Nationa l Flood Insurance Program ( NFIP ). In order to obtain FEMA accreditation, the levee owner...compliance documentation for meeting NFIP requirements. Barr conducted a thorough review of relevant documents to gain a better understanding of...compliance documentation for meeting NFIP requirements. Barr Engineering has prepared a Phase I Engineer’s Report and is developing plans and

  7. Army-NASA aircrew/aircraft integration program. Phase 5: A3I Man-Machine Integration Design and Analysis System (MIDAS) software concept document

    NASA Technical Reports Server (NTRS)

    Banda, Carolyn; Bushnell, David; Chen, Scott; Chiu, Alex; Neukom, Christian; Nishimura, Sayuri; Prevost, Michael; Shankar, Renuka; Staveland, Lowell; Smith, Greg

    1992-01-01

    This is the Software Concept Document for the Man-machine Integration Design and Analysis System (MIDAS) being developed as part of Phase V of the Army-NASA Aircrew/Aircraft Integration (A3I) Progam. The approach taken in this program since its inception in 1984 is that of incremental development with clearly defined phases. Phase 1 began in 1984 and subsequent phases have progressed at approximately 10-16 month intervals. Each phase of development consists of planning, setting requirements, preliminary design, detailed design, implementation, testing, demonstration and documentation. Phase 5 began with an off-site planning meeting in November, 1990. It is expected that Phase 5 development will be complete and ready for demonstration to invited visitors from industry, government and academia in May, 1992. This document, produced during the preliminary design period of Phase 5, is intended to record the top level design concept for MIDAS as it is currently conceived. This document has two main objectives: (1) to inform interested readers of the goals of the MIDAS Phase 5 development period, and (2) to serve as the initial version of the MIDAS design document which will be continuously updated as the design evolves. Since this document is written fairly early in the design period, many design issues still remain unresolved. Some of the unresolved issues are mentioned later in this document in the sections on specific components. Readers are cautioned that this is not a final design document and that, as the design of MIDAS matures, some of the design ideas recorded in this document will change. The final design will be documented in a detailed design document published after the demonstrations.

  8. BKKBN and the expanding role of private sector FP services and commercial contraceptive sales in Indonesia.

    PubMed

    Suyono, H

    1989-07-01

    The Indonesian family planning program is an internationally recognized success. Launched in 1970, the program, coordinated by the National Family Planning Coordinating Board (BKKBN), now enrolls an average of 20,000 new acceptors each day. About 60% of eligible couples participate in the program. The key factors in the BKKBN's strategy are 1) a firm commitment from all government leaders, 2) a positive relationship with religious and other leaders, 3) decentralization and flexibility, 4) a shift from a traditional clinic-based to a community-based program, and 5) the integration of the program with health, family welfare, and other development activities. The next phase of the program emphasizes self-support or self-reliance in family planning. This means taking responsibility for one's own family planning, but it also means that those who are financially able to do so should pay for services and supplies. New projects have begun with the private sector. BKKBN has been working with professional doctors' and midwives' associations to promote private initiatives for family planning. The Kondom Dua Lima, a social marketing project with a private company, distributes and sells condoms in the commercial retail sales market. The Blue Circle Contraceptive Social Marketing Project provides low-cost but high-quality contraceptive supplies to fill the gap between free BKKBN supplies and the expensive contraceptives available through commercial pharmacies. BKKBN is working with the private sector to encourage its participation in the Indonesian goal of institutionalizing the small, happy, and prosperous family norm.

  9. The experimental clean combustor program: Description and status to November 1975

    NASA Technical Reports Server (NTRS)

    Niedzwiecki, R. W.

    1975-01-01

    The generation of technology was studied for the development of advanced commercial CTOL aircraft engines with lower exhaust emissions than current aircraft. The program is in three phases. Phase 1, already completed, consisted of screening tests of low pollution combustor concepts. Phase 2, currently in progress, consists of test rig refinement of the most promising combustor concepts. Phase 2 test results are reported. Phase 3, also currently in progress, consists of incorporating and evaluating the best combustors as part of a complete engine. Engine test plans and pollution sampling techniques are described in this report. Program pollution goals, specified at engine idle and take-off conditions, are idle emission index value of 20 and 4 for carbon monoxide (CO) and total unburned hydrocarbons (THC), respectively, and at take-off are an oxides of nitrogen (NOx) emission index level of 10 and a smoke number of 15. Pollution data were obtained at all engine operating conditions. Results are presented in terms of emission index and also in terms of the Environmental Protection Agency's 1979 Standards Parameter.

  10. Microgravity research results and experiences from the NASA/MIR space station program.

    PubMed

    Schlagheck, R A; Trach, B L

    2003-12-01

    The Microgravity Research Program (MRP) participated aggressively in Phase 1 of the International Space Station Program using the Russian Mir Space Station. The Mir Station offered an otherwise unavailable opportunity to explore the advantages and challenges of long duration microgravity space research. Payloads with both National Aeronautics and Space Agency (NASA) and commercial backing were included as well as cooperative research with the Canadian Space Agency (CSA). From this experience, much was learned about long-duration on-orbit science utilization and developing new working relationships with our Russian partner to promote efficient planning, operations, and integration to solve complexities associated with a multiple partner program. This paper focuses on the microgravity research conducted onboard the Mir space station. It includes the Program preparation and planning necessary to support this type of cross increment research experience; the payloads which were flown; and summaries of significant microgravity science findings. Published by Elsevier Ltd.

  11. MOD-5A wind turbine generator program design report: Volume 1: Executive Summary

    NASA Technical Reports Server (NTRS)

    1984-01-01

    The design, development and analysis of the 7.3 MW MOD-5A wind turbine generator covering work performed between July 1980 and June 1984 is discussed. The report is divided into four volumes: Volume 1 summarizes the entire MOD-5A program, Volume 2 discusses the conceptual and preliminary design phases, Volume 3 describes the final design of the MOD-5A, and Volume 4 contains the drawings and specifications developed for the final design. Volume 1, the Executive Summary, summarizes all phases of the MOD-5A program. The performance and cost of energy generated by the MOD-5A are presented. Each subsystem - the rotor, drivetrain, nacelle, tower and foundation, power generation, and control and instrumentation subsystems - is described briefly. The early phases of the MOD-5A program, during which the design was analyzed and optimized, and new technologies and materials were developed, are discussed. Manufacturing, quality assurance, and safety plans are presented. The volume concludes with an index of volumes 2 and 3.

  12. MOSAIC : Model Of Sustainability And Integrated Corridors, phase 3 : comprehensive model calibration and validation and additional model enhancement.

    DOT National Transportation Integrated Search

    2015-02-01

    The Maryland State Highway Administration (SHA) has initiated major planning efforts to improve transportation : efficiency, safety, and sustainability on critical highway corridors through its Comprehensive Highway Corridor : (CHC) program. This pro...

  13. CV pilot deployment concept phase 1, outreach plan — ICF Wyoming.

    DOT National Transportation Integrated Search

    2016-06-24

    The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...

  14. Who Will Replace Those Vanishing Execs?

    ERIC Educational Resources Information Center

    Geber, Beverly

    2000-01-01

    Many top-level managers are retiring early. Programs to prepare their replacements have been scaled back. Many companies are offering phased retirement plans, redesigning jobs, and paying for spouses to go along on business trips to keep their managers a little longer. (JOW)

  15. Definition and preliminary design of the Laser Atmospheric Wind Sounder (LAWS) phase 1. Volume 3: Program cost estimates

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Cost estimates for phase C/D of the laser atmospheric wind sounder (LAWS) program are presented. This information provides a framework for cost, budget, and program planning estimates for LAWS. Volume 3 is divided into three sections. Section 1 details the approach taken to produce the cost figures, including the assumptions regarding the schedule for phase C/D and the methodology and rationale for costing the various work breakdown structure (WBS) elements. Section 2 shows a breakdown of the cost by WBS element, with the cost divided in non-recurring and recurring expenditures. Note that throughout this volume the cost is given in 1990 dollars, with bottom line totals also expressed in 1988 dollars (1 dollar(88) = 0.93 1 dollar(90)). Section 3 shows a breakdown of the cost by year. The WBS and WBS dictionary are included as an attachment to this report.

  16. NASA metric transition plan

    NASA Technical Reports Server (NTRS)

    1992-01-01

    NASA science publications have used the metric system of measurement since 1970. Although NASA has maintained a metric use policy since 1979, practical constraints have restricted actual use of metric units. In 1988, an amendment to the Metric Conversion Act of 1975 required the Federal Government to adopt the metric system except where impractical. In response to Public Law 100-418 and Executive Order 12770, NASA revised its metric use policy and developed this Metric Transition Plan. NASA's goal is to use the metric system for program development and functional support activities to the greatest practical extent by the end of 1995. The introduction of the metric system into new flight programs will determine the pace of the metric transition. Transition of institutional capabilities and support functions will be phased to enable use of the metric system in flight program development and operations. Externally oriented elements of this plan will introduce and actively support use of the metric system in education, public information, and small business programs. The plan also establishes a procedure for evaluating and approving waivers and exceptions to the required use of the metric system for new programs. Coordination with other Federal agencies and departments (through the Interagency Council on Metric Policy) and industry (directly and through professional societies and interest groups) will identify sources of external support and minimize duplication of effort.

  17. Transitions of Care Between Acute and Chronic Heart Failure: Critical Steps in the Design of a Multidisciplinary Care Model for the Prevention of Rehospitalization.

    PubMed

    Comín-Colet, Josep; Enjuanes, Cristina; Lupón, Josep; Cainzos-Achirica, Miguel; Badosa, Neus; Verdú, José María

    2016-10-01

    Despite advances in the treatment of heart failure, mortality, the number of readmissions, and their associated health care costs are very high. Heart failure care models inspired by the chronic care model, also known as heart failure programs or heart failure units, have shown clinical benefits in high-risk patients. However, while traditional heart failure units have focused on patients detected in the outpatient phase, the increasing pressure from hospital admissions is shifting the focus of interest toward multidisciplinary programs that concentrate on transitions of care, particularly between the acute phase and the postdischarge phase. These new integrated care models for heart failure revolve around interventions at the time of transitions of care. They are multidisciplinary and patient-centered, designed to ensure continuity of care, and have been demonstrated to reduce potentially avoidable hospital admissions. Key components of these models are early intervention during the inpatient phase, discharge planning, early postdischarge review and structured follow-up, advanced transition planning, and the involvement of physicians and nurses specialized in heart failure. It is hoped that such models will be progressively implemented across the country. Copyright © 2016 Sociedad Española de Cardiología. Published by Elsevier España, S.L.U. All rights reserved.

  18. Key steps for integrating a basic science throughout a medical school curriculum using an e-learning approach.

    PubMed

    Dubois, Eline Agnès; Franson, Kari Lanette

    2009-09-01

    Basic sciences can be integrated into the medical school curriculum via e-learning. The process of integrating a basic science in this manner resembles a curricular change. The change usually begins with an idea for using e-learning to teach a basic science and establishing the need for the innovation. In the planning phase, learning outcomes are formulated and a prototype of the program is developed based on the desired requirements. A realistic concept is formed after considering the limitations of the current institute. Next, a project team is assembled to develop the program and plan its integration. Incorporation of the e-learning program is facilitated by a well-developed and communicated integration plan. Various course coordinators are contacted to determine content of the e-learning program as well as establish assessment. Linking the e-learning program to existing course activities and thereby applying the basic science into the clinical context enhances the degree of integration. The success of the integration is demonstrated by a positive assessment of the program including favourable cost-benefit analysis and improved student performance. Lastly, when the program becomes institutionalised, continuously updating content and technology (when appropriate), and evaluating the integration contribute to the prolonged survival of the e-learning program.

  19. Bridging the Technology Valley of Death in Joint Medical Development

    DTIC Science & Technology

    2015-11-01

    Force lieutenant colonel, is the Air Force Medical Support Agency Advanced Development Liaison Field Engineer in Falls Church, Virginia. Prusaczyk is...Awareness, communication and coordination may be mini - mal among Service S&T and AD programs. Joint Transition Planning Process A Joint Transition...Human Proof of Phase III NDA/BLA ling Approval, Launch Concept*** Launch Review Program Initiation Materiel Technology Engineering & Production

  20. Installation Restoration Program. Phase 1. Records Search, Charleston AFB, South Carolina

    DTIC Science & Technology

    1983-10-01

    and plastics plants. Conducted industrial waste surveys, landfill design, and planning for plant environmental protection programs; evaluated air...management study for a major plastics manufacturing company. Responsibilitites included identification and investigation of a number of operating...61 aste Caracteristics 68 Pathways 69 Total 198 divided by 3 = 63 3ross total sc,:re B. Aooly factor for waste containment from waste manaement

  1. High temperature arc-track resistant aerospace insulation

    NASA Technical Reports Server (NTRS)

    Dorogy, William

    1994-01-01

    The topics are presented in viewgraph form and include the following: high temperature aerospace insulation; Foster-Miller approach to develop a 300 C rated, arc-track resistant aerospace insulation; advantages and disadvantages of key structural features; summary goals and achievements of the phase 1 program; performance goals for selected materials; materials under evaluation; molecular structures of candidate polymers; candidate polymer properties; film properties; and a detailed program plan.

  2. Protocols for collection of streamflow, water-quality, streambed-sediment, periphyton, macroinvertebrate, fish, and habitat data to describe stream quality for the Hydrobiological Monitoring Program, Equus Beds Aquifer Storage and Recovery Program, city of Wichita, Kansas

    USGS Publications Warehouse

    Stone, Mandy L.; Rasmussen, Teresa J.; Bennett, Trudy J.; Poulton, Barry C.; Ziegler, Andrew C.

    2012-01-01

    The city of Wichita, Kansas uses the Equus Beds aquifer, one of two sources, for municipal water supply. To meet future water needs, plans for artificial recharge of the aquifer have been implemented in several phases. Phase I of the Equus Beds Aquifer Storage and Recovery (ASR) Program began with injection of water from the Little Arkansas River into the aquifer for storage and subsequent recovery in 2006. Construction of a river intake structure and surface-water treatment plant began as implementation of Phase II of the Equus Beds ASR Program in 2010. An important aspect of the ASR Program is the monitoring of water quality and the effects of recharge activities on stream conditions. Physical, chemical, and biological data provide the basis for an integrated assessment of stream quality. This report describes protocols for collecting streamflow, water-quality, streambed-sediment, periphyton, macroinvertebrate, fish, and habitat data as part of the city of Wichita's hydrobiological monitoring program (HBMP). Following consistent and reliable methods for data collection and processing is imperative for the long-term success of the monitoring program.

  3. Patient Protection and Affordable Care Act; establishment of the multi-state plan program for the Affordable Insurance Exchanges.

    PubMed

    2013-03-11

    The U.S. Office of Personnel Management (OPM) is issuing a final regulation establishing the Multi-State Plan Program (MSPP) pursuant to the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010, referred to collectively as the Affordable Care Act. Through contracts with OPM, health insurance issuers will offer at least two multi-State plans (MSPs) on each of the Affordable Insurance Exchanges (Exchanges). One of the issuers must be non-profit. Under the law, an MSPP issuer may phase in the States in which it offers coverage over 4 years, but it must offer MSPs on Exchanges in all States and the District of Columbia by the fourth year in which the MSPP issuer participates in the MSPP. This rule aims to balance adhering to the statutory goals of MSPP while aligning its standards to those applying to qualified health plans to promote a level playing field across health plans.

  4. Automated Array Assembly, Phase 2

    NASA Technical Reports Server (NTRS)

    Daiello, R. V.

    1978-01-01

    The purpose of the overall program is to establish technological readiness and provide verification for the elements of a manufacturing sequence which would ultimately be suitable for the large-scale production of silicon solar-array modules at a selling price of less than $500/kW. A program and process plan for accomplishing this objective was developed and put into operation. Three junction-formation processes are shown; since cost analysis shows that they do not differ greatly in cost, each should be considered for technical merits and possible future cost reduction. The progress made in the various process steps of the plan is described, and conclusions are presented.

  5. A high-fidelity satellite ephemeris program for Earth satellites in eccentric orbits

    NASA Technical Reports Server (NTRS)

    Simmons, David R.

    1990-01-01

    A program for mission planning called the Analytic Satellite Ephemeris Program (ASEP), produces projected data for orbits that remain fairly close to the Earth. ASEP does not take into account lunar and solar perturbations. These perturbations are accounted for in another program called GRAVE, which incorporates more flexible means of input for initial data, provides additional kinds of output information, and makes use of structural programming techniques to make the program more understandable and reliable. GRAVE was revised, and a new program called ORBIT was developed. It is divided into three major phases: initialization, integration, and output. Results of the program development are presented.

  6. Light Water Reactor Sustainability Program A Reference Plan for Control Room Modernization: Planning and Analysis Phase

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jacques Hugo; Ronald Boring; Lew Hanes

    2013-09-01

    The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program is collaborating with a U.S. nuclear utility to bring about a systematic fleet-wide control room modernization. To facilitate this upgrade, a new distributed control system (DCS) is being introduced into the control rooms of these plants. The DCS will upgrade the legacy plant process computer and emergency response facility information system. In addition, the DCS will replace an existing analog turbine control system with a display-based system. With technology upgrades comes the opportunity to improve the overall human-system interaction between the operators and the control room. To optimize operatormore » performance, the LWRS Control Room Modernization research team followed a human-centered approach published by the U.S. Nuclear Regulatory Commission. NUREG-0711, Rev. 3, Human Factors Engineering Program Review Model (O’Hara et al., 2012), prescribes four phases for human factors engineering. This report provides examples of the first phase, Planning and Analysis. The three elements of Planning and Analysis in NUREG-0711 that are most crucial to initiating control room upgrades are: • Operating Experience Review: Identifies opportunities for improvement in the existing system and provides lessons learned from implemented systems. • Function Analysis and Allocation: Identifies which functions at the plant may be optimally handled by the DCS vs. the operators. • Task Analysis: Identifies how tasks might be optimized for the operators. Each of these elements is covered in a separate chapter. Examples are drawn from workshops with reactor operators that were conducted at the LWRS Human System Simulation Laboratory HSSL and at the respective plants. The findings in this report represent generalized accounts of more detailed proprietary reports produced for the utility for each plant. The goal of this LWRS report is to disseminate the technique and provide examples sufficient to serve as a template for other utilities’ projects for control room modernization.« less

  7. Phase 0 study for a geothermal superheated water proof of concept facility

    NASA Technical Reports Server (NTRS)

    Douglass, R. H.; Pearson, R. O.

    1974-01-01

    A Phase 0 study for the selection of a representative liquid-dominated geothermal resource of moderate salinity and temperature is discussed. Selection and conceptual design of a nominal 10-MWe energy conversion system, and implementation planning for Phase 1: subsystem (component, experiments) and Phase 2: final design, construction, and operation of experimental research facilities are reported. The objective of the overall program is to demonstrate the technical and economic viability of utilizing moderate temperature and salinity liquid-dominated resources with acceptable environmental impact, and thus encourage commercial scale development of geothermal electrical power generation.

  8. Using the Whole School, Whole Community, Whole Child Model: Implications for Practice

    PubMed Central

    Rooney, Laura E; Videto, Donna M; Birch, David A

    2015-01-01

    BACKGROUND Schools, school districts, and communities seeking to implement the Whole School, Whole Community, Whole Child (WSCC) model should carefully and deliberately select planning, implementation, and evaluation strategies. METHODS In this article, we identify strategies, steps, and resources within each phase that can be integrated into existing processes that help improve health outcomes and academic achievement. Implementation practices may vary across districts depending upon available resources and time commitments. RESULTS Obtaining and maintaining administrative support at the beginning of the planning phase is imperative for identifying and implementing strategies and sustaining efforts to improve student health and academic outcomes. Strategy selection hinges on priority needs, community assets, and resources identified through the planning process. Determining the results of implementing the WSCC is based upon a comprehensive evaluation that begins during the planning phase. Evaluation guides success in attaining goals and objectives, assesses strengths and weaknesses, provides direction for program adjustment, revision, and future planning, and informs stakeholders of the effect of WSCC, including the effect on academic indicators. CONCLUSIONS With careful planning, implementation, and evaluation efforts, use of the WSCC model has the potential of focusing family, community, and school education and health resources to increase the likelihood of better health and academic success for students and improve school and community life in the present and in the future. PMID:26440824

  9. First regional CSM program planned.

    PubMed

    1982-09-01

    6 countries in the English-speaking Caribbean (Antigua, Barbados, Dominica, St. Kitts/Nevis, St. Lucia, and St. Vincent) are scheduled to form the 1st regional contraceptive social marketing program. The program will be under the auspices of the Barbados Family Planning Association. By combining resources, contraceptive social marketing should be able to effectively augment family planning activities in smaller countries where individual programs wuld be too costly. The regional program will also determine whether program elements from 1 country in a region are relevant in other countries. The Caribbean region as a whole has experienced a general decline in both crude birth rates and fertility rates during the past 15 years; however, adolescent fertility rates remain high and an average of 46% of the populations of Caribbean countries are under 15 years of age. Although heavy emigration has traditionally curbed population increases, new restrictive immigration laws are expected. Further increases in the working age population will contribute to already high unemployment rates and hinder economic development. The 6 countries selected for the social marketing program are receptive to innovative family planning approaches and have the basic marketing infrastructure required. Community-based distribution programs already in operation in these countries distribute condoms, oral contraceptives, and barrier methods. The success of these programs has plateaued, and there is a need for delivery systems capable of reaching broader segments of the population. The social marketing program will be phased in to ensure local acceptance among national leaders and consumers. The regional program hopes to borrow elements from Jamaica's contraceptive social marketing program to avoid the costs involved in starting a program from scratch. A major innovation will be the use of mass media advertising for contraceptives.

  10. Second Destination Transportation, Phase II

    DTIC Science & Technology

    1976-01-01

    improvement. [j As an initial step toward improving shipment planning in the DoD, we fm recommend that the ASD{I< ScL ) sponsor a shipment planning...of containers in surface transportation. The principal ASD(I> ScL ) involvement in the second destination transportation programs of the Services... ScL ) responsibility for DoD transportation is shared with other DoD components. The ASD(C) is responsible for reviewing the SDT budgets of the

  11. Hospital renovation projects: phased construction requires planning at its best.

    PubMed

    Cox, J C

    1986-01-01

    Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.

  12. ZERO NET ENERGY HOMES PROJECT

    EPA Science Inventory

    The University of Texas at Austin School of Architecture and Community and Regional Planning Program seeks the P3 Award for an interdisciplinary studio that would be the first phase of an ambitious prototype project in partnership with the City of Austin's Green Bu...

  13. Integrated corridor management initiative : demonstration phase evaluation, Dallas traveler response analysis test plan.

    DOT National Transportation Integrated Search

    1997-09-26

    This report is forwarded to Congress according to Section 6054(c) of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). Specifically, this report: (1) Presents the goals and accomplishments of the ITS Program, which supports the de...

  14. Space station needs, attributes and architectural options study. Volume 1: Executive study

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Mission identification and validation, the benefits of a manned presence in space; attributes and architectures; time-phased mission and system requirements imposed on the space station; orbit selection; space station architectural options; technology selection; and program planning are addressed.

  15. Asset management program enhancement plan : baseline assessment phases I and II.

    DOT National Transportation Integrated Search

    2015-09-01

    This project resulted in the development of a framework for making asset management decisions on low-volume bridges. The : research focused on low-volume bridges located in the agricultural counties of Iowa because recent research has shown that thes...

  16. East-West transport corridor feasibility study : phase 1, vol. 2 : development plans : final report

    DOT National Transportation Integrated Search

    1998-04-01

    This study, conducted by Bechtel International, was funded by the U.S. Trade and Development Agency. The member countries of the South Balkan Initiative Program (Albania, Macedonia, and Bulgaria) are seeking to improve their transportation infrastruc...

  17. R&D Project Plan SLT/NEI/TRI Phase 2

    EPA Pesticide Factsheets

    The purpose of this project is to identify issues and solutions related to consistency of emissions data between SLT/NEI and TRI and to provide guidance to SLT/NEI/TRI programs to enhance data sharing between TRI and SLT/NEI data.

  18. Workstation Analysis, Ergonomic Style: Don't Despair, Teaching Ergonomic Workstation Analysis Isn't That Tough; but You Need a Plan.

    ERIC Educational Resources Information Center

    Merrell, Wayne L.; Zeimet, Denis E.

    1994-01-01

    Lists 15 principles for working safely with equipment. Describes phases of an ergonomic hazards program to identify and prevent problems and causes of cumulative trauma disorders in the workplace. (SK)

  19. HIFiRE Direct-Connect Rig (HDCR) Phase I Ground Test Results from the NASA Langley Arc-Heated Scramjet Test Facility

    NASA Technical Reports Server (NTRS)

    Hass, Neal E.; Cabell, Karen F.; Storch, Andrea M.

    2010-01-01

    The initial phase of hydrocarbon-fueled ground tests supporting Flight 2 of the Hypersonic International Flight Research Experiment (HIFiRE) Program has been conducted in the NASA Langley Arc-Heated Scramjet Test Facility (AHSTF). The HIFiRE Program, an Air Force-lead international cooperative program includes eight different flight test experiments designed to target specific challenges of hypersonic flight. The second of the eight planned flight experiments is a hydrocarbon-fueled scramjet flight test intended to demonstrate dual-mode to scramjet-mode operation and verify the scramjet performance prediction and design tools. A performance goal is the achievement of a combusted fuel equivalence ratio greater than 0.7 while in scramjet mode. The ground test rig, designated the HIFiRE Direct Connect Rig (HDCR), is a full-scale, heat sink, direct-connect ground test article that duplicates both the flowpath lines and the instrumentation layout of the isolator and combustor portion of the flight test hardware. The primary objectives of the HDCR Phase I tests are to verify the operability of the HIFiRE isolator/combustor across the Mach 6.0-8.0 flight regime and to establish a fuel distribution schedule to ensure a successful mode transition prior to the HiFIRE payload Critical Design Review. Although the phase I test plans include testing over the Mach 6 to 8 flight simulation range, only Mach 6 testing will be reported in this paper. Experimental results presented here include flowpath surface pressure, temperature, and heat flux distributions that demonstrate the operation of the flowpath over a small range of test conditions around the nominal Mach 6 simulation, as well as a range of fuel equivalence ratios and fuel injection distributions. Both ethylene and a mixture of ethylene and methane (planned for flight) were tested. Maximum back pressure and flameholding limits, as well as a baseline fuel schedule, that covers the Mach 5.84-6.5 test space have been identified.

  20. Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Klus, W. J.

    1987-01-01

    The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.

  1. Space science for applications - The history of Landsat

    NASA Technical Reports Server (NTRS)

    Mach, P. E.

    1981-01-01

    The history of the Landsat project is discussed in terms of three historical phases, each characterized by a dominant problem. From 1964 to 1967, the challenge was to develop interagency cooperation and to achieve consensus on basic plans for the satellite. Between 1968 and 1971, the cooperating agencies had to persuade the Bureau of the Budget to provide funding for the project. Since 1972, the challenge to NASA has been to encourage applications of the Landsat data and plan the shift from an experimental program to an operational one. The tension between experimental and operational goals has run through all these phases, and the conflicts between agencies is detailed, as well as the interaction between technological and political systems.

  2. IEC planning: eight state-of-the-art principles.

    PubMed

    Middleton, J

    1983-12-01

    Considerable experience and research has been accumulated in the last 20 years on the ways in which information/education/communication (IEC) programs can be effectively designed, implemented, and evaluated. Possibly more effort has focused on population and family planning IEC than on any other sectoral program of development communication. Several principles have emerged which, taken together, define the state of the art in the field. These principles provide a framework of experience which can guide the development of comprehensive IEC programs. They include: policy and resource assessment; audience analysis; strategy design; message research and pretesting; participation and feedback; management; evaluation; and collaboration. The nature of the national policy base for population and family planning programs will determine the goals and approaches of the IEC program. Strong policies of limitation on popultion growth lead to equally strong and pervasive IEC efforts designed to directly affect contraceptive behavior. Assessment of existing policy is an essential aspect of the design of an effective IEC program. Policies establish the rationale and boundaries for action. Population and family planning programs are concerned with some of the most intimate human behavior. Consequently, structured and sensitive audience analysis has become an integral part of the design of IEC programs. The design of communication strategy requires clearly stated objectives. Principles of human learning are used to structure information appropriately. Message research and pretesting have become integral components of the strategy design process. Small scale research on specific objectives is necessary to establish the basis for message design. Audience participation and feedback in remaining phases of program development and implementation are important. The management of an IEC program requires a specific combination of planning, flexibility, and creativity. Evaluation of program effects--identification of the degree of change toward stated objectives -- is critical to long term assessment of the underlying strategy and the identification both of needed corrections and new directions for the future. Collaboration with and involvement of stakeholders in the design and implementation of a national IEC program significantly raises the probability that support will be forthcoming. Taken together these 8 principles can become the basic building blocks of an effective population/family planning IEC program.

  3. DOE SBIR Phase-1 Report on Hybrid CPU-GPU Parallel Development of the Eulerian-Lagrangian Barracuda Multiphase Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dr. Dale M. Snider

    2011-02-28

    This report gives the result from the Phase-1 work on demonstrating greater than 10x speedup of the Barracuda computer program using parallel methods and GPU processors (General-Purpose Graphics Processing Unit or Graphics Processing Unit). Phase-1 demonstrated a 12x speedup on a typical Barracuda function using the GPU processor. The problem test case used about 5 million particles and 250,000 Eulerian grid cells. The relative speedup, compared to a single CPU, increases with increased number of particles giving greater than 12x speedup. Phase-1 work provided a path for reformatting data structure modifications to give good parallel performance while keeping a friendlymore » environment for new physics development and code maintenance. The implementation of data structure changes will be in Phase-2. Phase-1 laid the ground work for the complete parallelization of Barracuda in Phase-2, with the caveat that implemented computer practices for parallel programming done in Phase-1 gives immediate speedup in the current Barracuda serial running code. The Phase-1 tasks were completed successfully laying the frame work for Phase-2. The detailed results of Phase-1 are within this document. In general, the speedup of one function would be expected to be higher than the speedup of the entire code because of I/O functions and communication between the algorithms. However, because one of the most difficult Barracuda algorithms was parallelized in Phase-1 and because advanced parallelization methods and proposed parallelization optimization techniques identified in Phase-1 will be used in Phase-2, an overall Barracuda code speedup (relative to a single CPU) is expected to be greater than 10x. This means that a job which takes 30 days to complete will be done in 3 days. Tasks completed in Phase-1 are: Task 1: Profile the entire Barracuda code and select which subroutines are to be parallelized (See Section Choosing a Function to Accelerate) Task 2: Select a GPU consultant company and jointly parallelize subroutines (CPFD chose the small business EMPhotonics for the Phase-1 the technical partner. See Section Technical Objective and Approach) Task 3: Integrate parallel subroutines into Barracuda (See Section Results from Phase-1 and its subsections) Task 4: Testing, refinement, and optimization of parallel methodology (See Section Results from Phase-1 and Section Result Comparison Program) Task 5: Integrate Phase-1 parallel subroutines into Barracuda and release (See Section Results from Phase-1 and its subsections) Task 6: Roadmap of Phase-2 (See Section Plan for Phase-2) With the completion of Phase 1 we have the base understanding to completely parallelize Barracuda. An overview of the work to move Barracuda to a parallelized code is given in Plan for Phase-2.« less

  4. Systems Engineering in NASA's R&TD Programs

    NASA Technical Reports Server (NTRS)

    Jones, Harry

    2005-01-01

    Systems engineering is largely the analysis and planning that support the design, development, and operation of systems. The most common application of systems engineering is in guiding systems development projects that use a phased process of requirements, specifications, design, and development. This paper investigates how systems engineering techniques should be applied in research and technology development programs for advanced space systems. These programs should include anticipatory engineering of future space flight systems and a project portfolio selection process, as well as systems engineering for multiple development projects.

  5. National Dam Safety Program. Union Lake Dam (MO 30225), Missouri - Kansas City Basin, Jackson County, Missouri. Phase I Inspection Report.

    DTIC Science & Technology

    1980-12-01

    report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to...enter the complete contract or grant number(s) under which the wo-ieported was accomplished. Leave blank in in-house reports. Block 9. Performing...34Research and Development Planning Summary," which identifies the program element, project, task area, and work unit or equivalent under which the work

  6. A modeling framework for optimal long-term care insurance purchase decisions in retirement planning.

    PubMed

    Gupta, Aparna; Li, Lepeng

    2004-05-01

    The level of need and costs of obtaining long-term care (LTC) during retired life require that planning for it is an integral part of retirement planning. In this paper, we divide retirement planning into two phases, pre-retirement and post-retirement. On the basis of four interrelated models for health evolution, wealth evolution, LTC insurance premium and coverage, and LTC cost structure, a framework for optimal LTC insurance purchase decisions in the pre-retirement phase is developed. Optimal decisions are obtained by developing a trade-off between post-retirement LTC costs and LTC insurance premiums and coverage. Two-way branching models are used to model stochastic health events and asset returns. The resulting optimization problem is formulated as a dynamic programming problem. We compare the optimal decision under two insurance purchase scenarios: one assumes that insurance is purchased for good and other assumes it may be purchased, relinquished and re-purchased. Sensitivity analysis is performed for the retirement age.

  7. Spacelab - Ten years of international cooperation

    NASA Technical Reports Server (NTRS)

    Bignier, M.; Harrington, J. C.; Sander, M. J.

    1983-01-01

    The history, current status, and future plans of the Spacelab program are reviewed, with a focus on the cooperative relationship between ESA and NASA. The initial decision to undertake the program and the three agreements signed to begin its implementation are examined, and the division of responsibilities and financial contributions is discussed insofar as it affected the management structure. Consideration is given to the major facilities, the 50-mission operational cycle, communications, the currently scheduled activities (through 1985), the prospective later uses, and the ten dedicated discipline laboratories. The importance of continuous mutual support during the planning and development phases is stressed. The program so far is considered a success, in terms of the goals set by the participants and in terms of the resolution of the problems inherent in international technological endeavors.

  8. Installation Restoration Program Records Search for Westover Air Force Base, Massachusetts.

    DTIC Science & Technology

    1982-04-01

    Phase III (not part of this contract) consists of a technology base development study to support the development of project plans for controlling...determine the extent and magnitude of the contaminant migration. Phase III (not part of this contract) consists of a technology base development study to...number of vegetation studies have attempted to classify the potential climax vegetation within the region of Westover AFB (Braun, 1972; Kuchler, 1975

  9. A Stitch in Time Saves Nine: A Comprehensive Conflict Prevention Strategy

    DTIC Science & Technology

    2010-04-02

    prevention plan, has led to ad-hoc conflict prevention. 1 Charles F. Wald , "The Phase Zero Campaign," JFQ: Joint Force Quarterly, no. 43 (10...14. 24 Joint Chiefs of Staff, Joint Operations, 2008), IV 27-28. 25 Wald , The Phase Zero Campaign, 73. 26 Ibid., 73. 27 secure...Unconventional Threats and Capabilities. Testimony of Michael Lund and Dr. Lisa Schrich on the Roles of Non-Military Programs within a Comprehensive

  10. A narrative account of implementation lessons learnt from the dissemination of an up-scaled state-wide child obesity management program in Australia: PEACH™ (Parenting, Eating and Activity for Child Health) Queensland.

    PubMed

    Croyden, Debbie L; Vidgen, Helen A; Esdaile, Emma; Hernandez, Emely; Magarey, Anthea; Moores, Carly J; Daniels, Lynne

    2018-03-13

    PEACH™QLD translated the PEACH™ Program, designed to manage overweight/obesity in primary school-aged children, from efficacious RCT and small scale community trial to a larger state-wide program. This paper describes the lessons learnt when upscaling to universal health coverage. The 6-month, family-focussed program was delivered in Queensland, Australia from 2013 to 2016. Its implementation was planned by researchers who developed the program and conducted the RCT, and experienced project managers and practitioners across the health continuum. The intervention targeted parents as the agents of change and was delivered via parent-only group sessions. Concurrently, children attended fun, non-competitive activity sessions. Sessions were delivered by facilitators who received standardised training and were employed by a range of service providers. Participants were referred by health professionals or self-referred in response to extensive promotion and marketing. A pilot phase and a quality improvement framework were planned to respond to emerging challenges. Implementation challenges included engagement of the health system; participant recruitment; and engagement. A total of 1513 children (1216 families) enrolled, with 1122 children (919 families) in the face-to-face program (105 groups in 50 unique venues) and 391 children (297 families) in PEACH™ Online. Self-referral generated 68% of enrolments. Unexpected, concurrent and, far-reaching public health system changes contributed to poor program uptake by the sector (only 56 [53%] groups delivered by publicly-funded health organisations) requiring substantial modification of the original implementation plan. Process evaluation during the pilot phase and an ongoing quality improvement framework informed program adaptations that included changing from fortnightly to weekly sessions aligned with school terms, revision of parent materials, modification of eligibility criteria to include healthy weight children and provision of services privately. Comparisons between pilot versus state-wide waves showed comparable prevalence of families not attending any sessions (25% vs 28%) but improved number of sessions attended (median = 5 vs 7) and completion rates (43% vs 56%). Translating programs developed in the research context to enable implementation at scale is complex and presents substantial challenges. Planning must ensure there is flexibility to accommodate and proactively manage the system changes that are inevitable over time. ACTRN12617000315314 . This trial was registered retrospectively on 28 February, 2017.

  11. Creating the Future after Job Loss.

    ERIC Educational Resources Information Center

    McKnight, Richard

    1991-01-01

    Typical reactions to job loss are Victim, Survivor, and Navigator responses. A training program can help participants acknowledge their feelings, identify positive ways to manage change, understand the phases of change, learn stress management techniques, visualize their desired futures, and plan for achieving their vision. (SK)

  12. Tampa Bay Ecosystem Services Demonstration Pilot Phase 2 web site

    EPA Science Inventory

    The value of nature's benefits is difficult to consider in environmental decision-making since ecosystem goods and services are usually not well measured or quantified in economic terms. The Tampa Bay Estuary Program, Tampa Bay Regional Planning Council, the U.S. Environmental Pr...

  13. Flight Planning for the International Space Station-Levitation Observation of Dendrite Evolution in Steel Ternary Alloy Rapid Solidification

    NASA Technical Reports Server (NTRS)

    Flemings, M. C.; Matson, D. M.; Loser, W.; Hyers, R. W.; Rogers, J. R.; Curreri, Peter A. (Technical Monitor)

    2002-01-01

    The paper is an overview of the status and science for the LODESTARS research project. The program is aimed at understanding how melt convection influences phase selection and the evolution of rapid solidification microstructures

  14. SOFIA pointing history

    NASA Astrophysics Data System (ADS)

    Kärcher, Hans J.; Kunz, Nans; Temi, Pasquale; Krabbe, Alfred; Wagner, Jörg; Süß, Martin

    2014-07-01

    The original pointing accuracy requirement of the Stratospheric Observatory for Infrared Astronomy SOFIA was defined at the beginning of the program in the late 1980s as very challenging 0.2 arcsec rms. The early science flights of the observatory started in December 2010 and the observatory has reached in the mean time nearly 0.7 arcsec rms, which is sufficient for most of the SOFIA science instruments. NASA and DLR, the owners of SOFIA, are planning now a future 4 year program to bring the pointing down to the ultimate 0.2 arcsec rms. This may be the right time to recall the history of the pointing requirement and its verification and the possibility of its achievement via early computer models and wind tunnel tests, later computer aided end-to-end simulations up to the first commissioning flights some years ago. The paper recollects the tools used in the different project phases for the verification of the pointing performance, explains the achievements and may give hints for the planning of the upcoming final pointing improvement phase.

  15. Remote Excavation of Heavily Contaminated UXO Sites. The Range Master

    DTIC Science & Technology

    2007-09-05

    NUMBER 5c. PROGRAM ELEMENT NUMBER 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND...Master) ESTCP Project UX-200327 ii Final Phase II Report, September 2007 3.5.5 Sampling Plan...Explosive HSP Health and Safety Program HTRW Hazardous, Toxic, and Radioactive Waste HTW Hazardous and Toxic Waste HW Hazardous Waste IAW In

  16. Command History. United States Military Assistance Command, Vietnam 1968. Volume 2

    DTIC Science & Technology

    1968-01-01

    phase of the 1968 plan was put through ae scheduled. The opening of the Tte Offensive. however, temporarily scuttled the program. Temporarily, local...decrease slightly. Completed construction of an additional 1, 200 km oalhighways and tte restoration of more of the VNRS was expected to materialize in...Assistance Program MINRON Mine Squadron \\05 Military Intelligence Service MISC Mobile Infiltration Surveillance Center MIUWG Mobile Inshore Undersea

  17. The Practice of Health Program Evaluation.

    PubMed

    Lewis, Sarah R

    2017-11-01

    The Practice of Health Program Evaluation provides an overview of the evaluation process for public health programs while diving deeper to address select advanced concepts and techniques. The book unfolds evaluation as a three-phased process consisting of identification of evaluation questions, data collection and analysis, and dissemination of results and recommendations. The text covers research design, sampling methods, as well as quantitative and qualitative approaches. Types of evaluation are also discussed, including economic assessment and systems research as relative newcomers. Aspects critical to conducting a successful evaluation regardless of type or research design are emphasized, such as stakeholder engagement, validity and reliability, and adoption of sound recommendations. The book encourages evaluators to document their approach by developing an evaluation plan, a data analysis plan, and a dissemination plan, in order to help build consensus throughout the process. The evaluative text offers a good bird's-eye view of the evaluation process, while offering guidance for evaluation experts on how to navigate political waters and advocate for their findings to help affect change.

  18. Juggling Act: Re-Planning and Building on Observatory...Simultaneously!

    NASA Technical Reports Server (NTRS)

    Zavala, Eddie; Daws, Patricia

    2011-01-01

    SOFIA (Stratospheric Observatory for Infrared Astronomy) is a major SMD program that has been required to meet several requirements and implement major planning and business initiatives overthe past 1 1/2 years, in the midst of system development and flight test phases. The program was required to implementing JCL and EVM simultaneously, as well as undergo a major replan and Standing Review Board - and all without impacting technical schedule progress. The team developed innovative processes that met all the requirements, and improved Program Management process toolsets. The SOFIA team, being subject to all the typical budget constraints, found ways to leverage existing roles in new ways to meet the requirements without creating unmanageable overhead. The team developed strategies and value added processes - such as improved risk identification, structured reserves management, cost/risk integration - so that the effort expended resulted in a positive return to the program.

  19. Flight service evaluation of an advanced composite empennage component on commercial transport aircraft. Phase 1: Engineering development

    NASA Technical Reports Server (NTRS)

    Ary, A.; Axtell, C.; Fogg, L.; Jackson, A.; James, A. M.; Mosesian, B.; Vanderwier, J.; Vanhamersveld, J.

    1976-01-01

    The empennage component selected for this program is the vertical fin box of the L-1011 aircraft. The box structure extends from the fuselage production joint to the tip rib and includes the front and rear spars. Various design options were evaluated to arrive at a configuration which would offer the highest potential for satisfying program objectives. The preferred configuration selected consists of a hat-stiffened cover with molded integrally stiffened spars, aluminum trussed composite ribs, and composite miniwich web ribs with integrally molded caps. Material screening tests were performed to select an advanced composite material system for the Advanced Composite Vertical Fin (ACFV) that would meet the program requirements from the standpoint of quality, reproducibility, and cost. Preliminary weight and cost analysis were made, targets established, and tracking plans developed. These include FAA certification, ancillary test program, quality control, and structural integrity control plans.

  20. Transformation toughened ceramics for the heavy duty diesel engine technology program

    NASA Technical Reports Server (NTRS)

    Musikant, S.; Feingold, E.; Rauch, H.; Samanta, S.

    1984-01-01

    The objective of this program is to develop an advanced high temperature oxide structural ceramic for application to the heavy duty diesel engine. The approach is to employ transformation toughening by additions of ZrO.5HfO.5O2 solid solution to the oxide ceramics, mullite (2Al2O3S2SiO2) and alumina (Al2O3). The study is planned for three phases, each 12 months in duration. This report covers Phase 1. During this period, processing techniques were developed to incorporate the ZrO.5HfO.5O2 solid solution in the matrices while retaining the necessary metastable tetragonal phase. Modulus of rupture and of elasticity, coefficient of thermal expansion, fracture toughness by indent technique and thermal diffusivity of representative specimens were measured. In Phase 2, the process will be improved to provide higher mechanical strength and to define the techniques for scale up to component size. In Phase 3, full scale component prototypes will be fabri-]cated.

  1. Controls-structures interaction guest investigator program: Overview and phase 1 experimental results and future plans

    NASA Technical Reports Server (NTRS)

    Smith-Taylor, Rudeen; Tanner, Sharon E.

    1993-01-01

    The NASA Controls-Structures Interaction (CSI) Guest Investigator program is described in terms of its support of the development of CSI technologies. The program is based on the introduction of CSI researchers from industry and academia to available test facilities for experimental validation of technologies and methods. Phase 1 experimental results are reviewed with attention given to their use of the Mini-MAST test facility and the facility for the Advance Control Evaluation of Structures. Experiments were conducted regarding the following topics: collocated/noncollocated controllers, nonlinear math modeling, controller design, passive/active suspension systems design, and system identification and fault isolation. The results demonstrate that significantly enhanced performance from the control techniques can be achieved by integrating knowledge of the structural dynamics under consideration into the approaches.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, Thomas M.; Berndt, Markus; Baglietto, Emilio

    The purpose of this report is to document a multi-year plan for enhancing turbulence modeling in Hydra-TH for the Consortium for Advanced Simulation of Light Water Reactors (CASL) program. Hydra-TH is being developed to the meet the high- fidelity, high-Reynolds number CFD based thermal hydraulic simulation needs of the program. This work is being conducted within the thermal hydraulics methods (THM) focus area. This report is an extension of THM CASL milestone L3:THM.CFD.P10.02 [33] (March, 2015) and picks up where it left off. It will also serve to meet the requirements of CASL THM level three milestone, L3:THM.CFD.P11.04, scheduled formore » completion September 30, 2015. The objectives of this plan will be met by: maturation of recently added turbulence models, strategic design/development of new models and systematic and rigorous testing of existing and new models and model extensions. While multi-phase turbulent flow simulations are important to the program, only single-phase modeling will be considered in this report. Large Eddy Simulation (LES) is also an important modeling methodology. However, at least in the first year, the focus is on steady-state Reynolds Averaged Navier-Stokes (RANS) turbulence modeling.« less

  3. Modeling Costs and Impacts of Introducing Early Infant Male Circumcision for Long-Term Sustainability of the Voluntary Medical Male Circumcision Program.

    PubMed

    Njeuhmeli, Emmanuel; Stegman, Peter; Kripke, Katharine; Mugurungi, Owen; Ncube, Gertrude; Xaba, Sinokuthemba; Hatzold, Karin; Christensen, Alice; Stover, John

    2016-01-01

    Voluntary medical male circumcision (VMMC) has been shown to be an effective prevention strategy against HIV infection in males [1-3]. Since 2007, the President's Emergency Plan for AIDS Relief (PEPFAR) has supported VMMC programs in 14 priority countries in Africa. Today several of these countries are preparing to transition their VMMC programs from a scale-up and expansion phase to a maintenance phase. As they do so, they must consider the best approaches to sustain high levels of male circumcision in the population. The two alternatives under consideration are circumcising adolescents 10-14 years old over the long term or integrating early infant male circumcision (EIMC) into maternal and child health programs. The paper presents an analysis, using the Decision Makers Program Planning Tool, Version 2.0 (DMPPT 2.0), of the estimated cost and impact of introducing EIMC into existing VMMC programs in several countries in eastern and southern Africa. Limited cost data exist for the implementation of EIMC, but preliminary studies, such as the one detailed in Mangenah, et al. [4-5], suggest that the cost of EIMC may be less than that of adolescent and adult male circumcision. If this is the case, then adding EIMC to the VMMC program will increase the number of circumcisions that need to be performed but will not increase the total cost of the program over the long term. In addition, we found that a delayed or slow start-up of EIMC would not substantially reduce the impact of adding it to the program or increase cumulative long-term costs, which should make introduction of EIMC more feasible and attractive to countries contemplating such a program innovation.

  4. Involving the Deaf Community in the Training Process

    ERIC Educational Resources Information Center

    Jones, Ray L.

    1972-01-01

    Discussed are strategies that have been found successful in operating a national leadership training program for deaf persons such as consulting deaf persons about all phases of training, planning, operation, and evaluation, accepting deaf trainees, and acquiring first hand acquaintance with deaf people from the community. (GW)

  5. A Knowledge Use Perspective: Comments on a Conference.

    ERIC Educational Resources Information Center

    Fisher, Evelyn

    The papers from the 1982 conference on Pennsylvania's Long Range Plan for School Improvement (LRPSI) assist in constructing reality about LRPSI itself. Focusing on the program's registration phase, Charles Gorman offers an alternative proposal, linking registration and evaluation, that would contribute to improving schools and increasing public…

  6. Connected Vehicle Pilot Deployment Concept phase 1 : comprehensive Pilot Deployment Plan : ICF Wyoming : draft final report.

    DOT National Transportation Integrated Search

    2016-08-11

    The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...

  7. Comprehensive care plus creative architecture.

    PubMed

    Easter, James G

    2005-01-01

    The delivery of high-quality, comprehensive cancer care and the treatment environment go hand in hand with the patient's recovery. When the planning and design of a comprehensive cancer care program runs parallel to the operational expectations and functional standards, the building users (patients, staff, and physicians) benefit significantly. This behavioral response requires a sensitive interface during the campus master planning, architectural programming, and design phases. Each building component and user functioning along the "continuum of care" will have different expectations, programmatic needs, and design responses. This article addresses the community- and hospital-based elements of this continuum. The environment does affect the patient care and the care-giving team members. It may be a positive or, unfortunately, a negative response.

  8. Project plan hydrogen energy systems technology. Phase 1: Hydrogen energy systems technology study

    NASA Technical Reports Server (NTRS)

    1974-01-01

    An overview of the potential need for hydrogen as a source of energy in the future was presented in order to identify and define the technology requirements for the most promising approaches to meet that need. The following study objectives were discussed: (1) determination of the future demand for hydrogen, based on current trends and anticipated new uses, (2) identification of the critical research and technology advances required to meet this need considering, to the extent possible, raw material limitations, economics, and environmental effects, and (3) definition and recommendation of the scope and space of a National Hydrogen Energy Systems Technology Program and outline of a Program Development Plan.

  9. U.S. Federal Investments in Climate Change Education: They're Warming Up! (Invited)

    NASA Astrophysics Data System (ADS)

    Karsten, J. L.; Niepold, F.; Wei, M.; Usgcrp Education Interagency Working Group

    2010-12-01

    Many similarities exist between the U.S. federal government and the climate system, in terms of their complexity. Government operates through a dynamic interplay of sub-systems (different agencies), pressure gradients (political interests), energy transformations (converting dollars into activity through Congressional appropriations, grants and contracts), and non-linear positive and negative feedback mechanisms (MOU’s, competing agency missions). ‘Viscosity’ in the system makes progress difficult. The good news is that, like the climate, federal investments in climate change education are heating up, due to man-made inputs. Individual agency investments in projects to improve and monitor public understanding of climate change and its impacts are rapidly becoming more coupled and coherent. This paper will discuss several efforts now underway. In FY 2009, dedicated, multi-million dollar funding led to creation of NSF’s Climate Change Education (CCE) and NASA’s Global Climate Change Education (GCCE) grant programs, which are funding a projects to develop pedagogically-sound learning resources, professional development strategies, tool kits, and web-based clearinghouses offering scientifically accurate information about climate change to different learner audiences. NOAA has been able to firmly establish their Environmental Literacy Grant (ELG) program because of the America COMPETES Act. Related programs are being developed within the EPA and USDA’s NIFA and U.S. Forest Service. Several other agencies have revamped their strategic plans to increase focus on communicating with and educating teachers, students, policymakers, and the general public about climate change, adaptation, and mitigation issues. To foster larger networks of scientists and educators, minimize duplication, and encourage synergy and scale-up, NSF, NOAA, and NASA have initiated joint meetings of their CCE, GCCE, and ELG Principal Investigators and shared evaluations. Additional cross-agency linkages are being encouraged through NSF’s new Climate Change Education Partnership (CCEP) program, which launched 15 Phase I Partnerships focused around specific geographic regions or scientific themes unified by common climate change impacts. When fully implemented in Phase II, CCEP expects to increase the adoption of high quality educational resources and their impact on public climate literacy. Phase I strategic planning efforts will identify and engage relevant stakeholders, inventory existing climate change education resources for that theme or region, conduct a needs analysis, and develop a robust strategic plan for implementation in Phase II. The U.S. Global Change Research Program (USGCRP) is the primary organizational structure through which the 13 federal agencies that conduct climate-related research, education, and outreach are coordinating their efforts. The Climate Literacy framework is one example of the constructive collaboration that has been achieved through the USGCRP Education Interagency Working Group. Additional efforts are being planned through a new Interagency Climate Communication and Education Task Force.

  10. The WAMI Rural Hospital Project. Part 3: Building health care leadership in rural communities.

    PubMed

    Elder, W G; Amundson, B A

    1991-01-01

    The WAMI Rural Hospital Project (RHP) intervention combined aspects of community development, strategic planning and organizational development to address the leadership issues in six Northwest rural hospitals. Hospitals and physicians, other community health care providers and local townspeople were involved in this intervention, which was accomplished in three phases. In the first phase, extensive information about organizational effectiveness was collected at each site. Phase two consisted of 30 hours of education for the physician, board, and hospital administrator community representatives covering management, hospital board governance, and scope of service planning. In the third phase, each community worked with a facilitator to complete a strategic plan and to resolve conflicts addressed in the management analyses. The results of the evaluation demonstrated that the greatest change noted among RHP hospitals was improvement in the effectiveness of their governing boards. All boards adopted some or all of the project's model governance plan and had successfully completed considerable portions of their strategic plans by 1989. Teamwork among the management triad (hospital, board, and medical staff) was also substantially improved. Other improvements included the development of marketing plans for the three hospitals that did not initially have them and more effective use of outside consultants. The project had less impact on improving the functioning of the medical chief of staff, although this was not a primary target of the intervention. There was also relatively less community interest in joining regional health care associations. The authors conclude that an intervention program tailored to address specific community needs and clearly identified leadership deficiencies can have a positive effect on rural health care systems.

  11. Knowledge-based decision support for Space Station assembly sequence planning

    NASA Astrophysics Data System (ADS)

    1991-04-01

    A complete Personal Analysis Assistant (PAA) for Space Station Freedom (SSF) assembly sequence planning consists of three software components: the system infrastructure, intra-flight value added, and inter-flight value added. The system infrastructure is the substrate on which software elements providing inter-flight and intra-flight value-added functionality are built. It provides the capability for building representations of assembly sequence plans and specification of constraints and analysis options. Intra-flight value-added provides functionality that will, given the manifest for each flight, define cargo elements, place them in the National Space Transportation System (NSTS) cargo bay, compute performance measure values, and identify violated constraints. Inter-flight value-added provides functionality that will, given major milestone dates and capability requirements, determine the number and dates of required flights and develop a manifest for each flight. The current project is Phase 1 of a projected two phase program and delivers the system infrastructure. Intra- and inter-flight value-added were to be developed in Phase 2, which has not been funded. Based on experience derived from hundreds of projects conducted over the past seven years, ISX developed an Intelligent Systems Engineering (ISE) methodology that combines the methods of systems engineering and knowledge engineering to meet the special systems development requirements posed by intelligent systems, systems that blend artificial intelligence and other advanced technologies with more conventional computing technologies. The ISE methodology defines a phased program process that begins with an application assessment designed to provide a preliminary determination of the relative technical risks and payoffs associated with a potential application, and then moves through requirements analysis, system design, and development.

  12. Knowledge-based decision support for Space Station assembly sequence planning

    NASA Technical Reports Server (NTRS)

    1991-01-01

    A complete Personal Analysis Assistant (PAA) for Space Station Freedom (SSF) assembly sequence planning consists of three software components: the system infrastructure, intra-flight value added, and inter-flight value added. The system infrastructure is the substrate on which software elements providing inter-flight and intra-flight value-added functionality are built. It provides the capability for building representations of assembly sequence plans and specification of constraints and analysis options. Intra-flight value-added provides functionality that will, given the manifest for each flight, define cargo elements, place them in the National Space Transportation System (NSTS) cargo bay, compute performance measure values, and identify violated constraints. Inter-flight value-added provides functionality that will, given major milestone dates and capability requirements, determine the number and dates of required flights and develop a manifest for each flight. The current project is Phase 1 of a projected two phase program and delivers the system infrastructure. Intra- and inter-flight value-added were to be developed in Phase 2, which has not been funded. Based on experience derived from hundreds of projects conducted over the past seven years, ISX developed an Intelligent Systems Engineering (ISE) methodology that combines the methods of systems engineering and knowledge engineering to meet the special systems development requirements posed by intelligent systems, systems that blend artificial intelligence and other advanced technologies with more conventional computing technologies. The ISE methodology defines a phased program process that begins with an application assessment designed to provide a preliminary determination of the relative technical risks and payoffs associated with a potential application, and then moves through requirements analysis, system design, and development.

  13. United States of America (country/area statements).

    PubMed

    1985-09-01

    This statement presented to the Committee on Population of the UN Economic and Social Commission for Asia and the Pacific (ESCAP) cites the goal of population assistance contained in the preamble of the Report of the International Conference on Population, which was to improve the population's standard of living and quality of life. ESCAP program activities should embody various points from the International Conference on population at Mexico City, including an emphasis on the mutually reinforcing roles of population and other development programs, well developed family planning programs in which abortion is not presented as a method of family planning, measures to ensure full integration of women into all phases of development, research to develop improved methods of contraception and service delivery, and important roles for nongovernmental organizations and the private sector. The US position on population assistance has 3 main elements: the expansion of voluntary family planning services throughout the developing world, the unacceptability of abortion as a family planning method, and the need for wise economic policies in addition to family planning services. In some countries family planning can alleviate high population growth rates which seriously overburden already inadequate resources, and in others family planning is more important to the health and welfare of individual mothers and children. The US agrees with the opinion of the Mexico City Conference that private sector organizations can make significant contributions in family planning. During the past 2 decades, the US has provided over $US2500 million in population assistance to developing countries through bilateral agreements, multilateral institutions, and private organizations. The US intends to continue its support for population programs which slow population growth, promote economic development, and respect internationally recognized human rights. Coercion in family planning programs cannot be reconciled with the principle that all couples and individuals have the basic right to decide freely and responsably the number and spacing of their children and to have the information and means to do so. Voluntarism is an essential element in population programs because family planning touches the most intimate areas of the lives of couples, because longterm change in fertility behavior is achieved only when the choices reflect the free decisions of couples, because user-preferences and the motivation of providers to improve program acceptability are compromised by coercion, and because voluntarism is a basic human right.

  14. Microgravity Research Results and Experiences from the NASA Mir Space Station Program

    NASA Technical Reports Server (NTRS)

    Schagheck, R. A.; Trach, B.

    2000-01-01

    The Microgravity Research Program Office (MRPO) participated aggressively in Phase I of the International Space Station Program using the Russian Mir Space Station. The Mir Station offered an otherwise unavailable opportunity to explore the advantages and challenges to long duration microgravity space research. Payloads with both NASA and commercial backing were included as well as cooperative research with the Canadian Space Agency (CSA). From this experience, much was learned about dealing with long duration on orbit science utilization and developing new working relationships with our Russian partner to promote efficient planning, operations, and integration to solve complexities associated with a multiple partner program. Microgravity participation in the NASA Mir Program began with the first joint NASA Mir flight to the Mir Space Station. The earliest participation setup acceleration measurement capabilities that were used throughout the Program. Research, conducted by all Microgravity science disciplines, continued on each subsequent increment for the entire three-year duration of the Program. The Phase I Program included the Microgravity participation of over 30 Fluids, Combustion, Materials, and Biotechnology Sciences and numerous commercially sponsored research payloads. In addition to the research gained from Microgravity investigations, long duration operation of facility hardware was tested. Microgravity facilities operated on Mir included the Space Acceleration Measurement System (SAMS), the Microgravity Glovebox (MGBX), the Biotechnology System (BTS) and the Canadian Space Agency sponsored Microgravity Isolation Mount (MIM). The Russian OPTIZONE Furnace was also incorporated into our material science research. All of these efforts yielded significant and useful scientific research data. This paper focuses on the microgravity research conducted onboard the Mir space station. It includes the Program preparation and planning necessary to support this type of cross increment research experience; the payloads which were flown; and summaries of significant microgravity science findings. Most importantly this paper highlights the various disciplines of microgravity research conducted during the International Space Station, Phase 1 Program onboard the Mir Station. A capsulation of significant research and the applicability of our findings are provided. In addition, a brief discussion of how future microgravity science gathering capabilities, hardware development and payload operations techniques have enhanced our ability to conduct long duration microgravity research.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Istanbul Water and Sewerage Administration (ISKI) was formed in 1982, and since that time a phased program of sewage collection and treatment has been implemented. Fifteen waste treatment plants, ranging from full scale biological treatment to pre-treatment, are in the design or planning stage, and over 2,000 km of collection lines have been installed. Concurrent with the program is an increasing emphasis on industrial waste treatment, which results in the production of both non-hazardous and hazardous sludges.

  16. Implementing cognitive remediation and social cognitive interaction training into standard psychosis care.

    PubMed

    Dark, Frances; Harris, Meredith; Gore-Jones, Victoria; Newman, Ellie; Whiteford, Harvey

    2018-06-15

    To evaluate the planned implementation of group based Cognitive Remediation therapy (CR) and Social Cognitive Interaction Training (SCIT) into routine psychosis care in a mental health service in Australia. The study was conducted over 3 years in a mental health service in a metropolitan city in Australia. Participants were 22 program facilitators and 128 patients attending the programs. Implementation outcomes were assessed using administrative data, staff surveys and program audits. There was fidelity to the particular therapies at a program level. Programs were assessed as being feasible within the study setting with each hospital district developing a capacity to run CR and SCIT. The establishment of new programs improved the reach, but waiting lists indicate a need to expand capacity. There was a relatively high dropout and several factors impacted on completion of the programs - notably, acute exacerbation of psychosis. Once initiated the therapies were acceptable with no-one ceasing SCIT due to loss of interest and only 10% of participants ceasing CR due to loss of interest. Annual audits of programs found programs established were maintained and facilitators were retained. SCIT and CR programs were successfully implemented in three hospital districts. Several factors impeded participants receiving the recommended "dose" of the programs. The maintenance of the programs in the short term is encouraging in regards to organisational fit. Dissemination of cognitive rehabilitation programs to a service population takes planning. An implementation plan is essential for guiding development and maintenance of programs. These therapies are best suited to people in a stable phase of illness. Service user co-production is recommended to improve recruitment in future studies.

  17. A Regional Approach to Wildlife Monitoring Related to Energy Exploration and Development in Colorado

    USGS Publications Warehouse

    Kotliar, Natasha B.; Bowen, Zachary H.; Ouren, Douglas S.; Farmer, Adrian H.

    2008-01-01

    The U.S. Bureau of Land Management (BLM) is currently developing a National Monitoring Strategy that will guide efforts to create an efficient and effective process for monitoring land health by BLM. To inform the ongoing development of the national strategy, BLM selected two States (Colorado, Alaska) to serve as focal areas on which to base a flexible framework for developing monitoring programs that evaluate wildlife responses to energy development. We developed a three-phase monitoring plan to serve as a template and applied it to the design of a monitoring program for the Colorado focal area (White River and Glenwood Springs Field Offices of the BLM). Phase I is a synthesis and assessment of current conditions that capitalizes on existing but under used data sources. A key component is the use of existing habitat and landscape models to evaluate the cumulative effects of surface disturbance. Phase II is the data collection process that uses information provided in Phase I to refine management objectives and provide a linkage to management decisions. The linkage is established through targeted monitoring, adaptive management, and research. Phase III establishes priorities and strategies for regional and national monitoring, and facilitates coordination among other land management agencies and organizations. The three phases are designed to be flexible and complementary. The monitoring plan guides an iterative process that is performed incrementally, beginning with the highest-priority species and management issues, while building on lessons learned and coordination among administrative levels. The activities associated with each phase can be repeated or updated as new information, data, or tools become available. This allows the development of a monitoring program that expands gradually and allows for rapid implementation. A demonstration application of the three-phase monitoring plan was conducted for a study area encompassing five BLM field offices in Colorado: White River, Glenwood Springs, Kremmling, Grand Junction, and Little Snake. The overall study area was selected to encompass the primary distribution of sagebrush and greater sage-grouse (Centrocercus urophasianus) in Colorado and to provide a larger context for evaluating priority management issues of the White River and Glenwood Springs Field Offices. Within the study area, we selected an additional scale of analysis: the Roan Plateau, an area of increased energy development. We focused our demonstration project on the primary objectives identified by the BLM and other stakeholders: (1) How do we evaluate the cumulative effects of energy development and mitigation activities on species of management interest or concern? (2) How can cumulative effects, including direct and indirect effects, be quantified relative to natural variation? (3) How can we implement compliance and effectiveness monitoring to determine whether lease stipulations are met and restoration/mitigation goals are achieved? We targeted greater sage-grouse because this species was identified as a monitoring priority for the White River Field Office. We also evaluated landscape-level indices to address fragmentation resulting from surface disturbance. The primary purpose of this exercise was to highlight the types of analyses and approaches that could be used to evaluate energy development in an application of the three-phase framework. We provide examples of Phase I products that can be used to guide the refinement of management objectives, development of adaptive management and research frameworks, and planning activities in Phase II. Finally, we report on the BLM's National Sage-Grouse Habitat Conservation Strategy as an example of Phase III activities. The development of an effective monitoring program is a daunting task, and will be difficult to implement by the BLM independently due to the current work load of staff. However, the scientific expertise and experience for developing cr

  18. Space station common module power system network topology and hardware development

    NASA Technical Reports Server (NTRS)

    Landis, D. M.

    1985-01-01

    Candidate power system newtork topologies for the space station common module are defined and developed and the necessary hardware for test and evaluation is provided. Martin Marietta's approach to performing the proposed program is presented. Performance of the tasks described will assure systematic development and evaluation of program results, and will provide the necessary management tools, visibility, and control techniques for performance assessment. The plan is submitted in accordance with the data requirements given and includes a comprehensive task logic flow diagram, time phased manpower requirements, a program milestone schedule, and detailed descriptions of each program task.

  19. US effort on HTS power transformers

    NASA Astrophysics Data System (ADS)

    Mehta, S.

    2011-11-01

    Waukesha Electric Systems has been working in HTS power transformers development program under the auspices of US Government Department of Energy since 1994. This presentation will describe various milestones for this program and program history along with the lessons learned along the way. Our motivations for working on this development program based on man benefits offered by HTS power transformers to power delivery systems will be discussed. Based on various issues encountered during execution of many HTS projects, DOE has set up an independent program review process that is lead by team of experts. This team reviews are integral part of all DOE HTS projects. Success of all projects would be greatly enhanced by identifying critical issues early in the program. Requiring appropriate actions to mitigate the issues before processing further will lead to proactive interrogation and incorporation of expert's ideas in the project plans. Working of this review process will be also described in this presentation. Waukesha Electric Systems team including: Superpower-Inc, Oak Ridge National Laboratory, University of Houston Center for Superconductivity and Southern California Edison company was awarded a cost share grant by US Government in 2010 for development of a fault current limiting HTS power transformer. This multi year's program will require design, manufacture, installation, and monitoring of a 28 MVA tree phase transformer installed at Irvine CA. Smart Grid demonstration site. Transformer specifications along with requirements for fault current limiting and site requirement will be discussed. Design and development of various sub systems in support of this program including: HTS conductor performance specification, Dielectric system design approach, Dewar development for containing phase assemblies, cryo-cooling system design approach, etc. will be described. Finally; overall program schedule, critical milestone events, test plans and progress to date will be reported.

  20. Test plan. Task 5, subtask 5.2: Early on-orbit TPSdebris impact tests

    NASA Technical Reports Server (NTRS)

    Greenberg, H. S.

    1994-01-01

    The limitation of damage to, and survival of, the cryogenic tankage during the on-orbit stay despite potential impact of orbital debris, may be a significant discriminator in the RHCTS trade studies described in the TA-1 trade study plan (ref. RHCTS-TSP-1) dated July 29, 1994. The objective of this early phase of an overall debris impact test program is to provide the data to support assessment of the relative suitability of integral and non integral tanks.

  1. How to Conduct a Research Field Trip

    ERIC Educational Resources Information Center

    Wacker, David G.

    1974-01-01

    Discusses the three phases of a three-day intensive research study field trip: planning and pre-trip training; actual trip; and post-trip report, research and data organization, and final trip evaluation. Included is a sample program of the limnology field trip taken by the Grafton High School, Wisconsin. (CC)

  2. Management Education and the Liberal Arts at Babson College.

    ERIC Educational Resources Information Center

    Handler, Edward; Sorenson, Ralph Z.

    1979-01-01

    The experience of Babson College of integrating liberal arts into a school of management program is presented through three phases of development culminating with a second master plan formulated in 1975. The liberal arts are seen as making a vital contribution to a broad preparation for managerial responsibility. (JMF)

  3. Combat Ready Crew Performance Measurement System. Phase IIID. Specifications and Implementation Plan

    DTIC Science & Technology

    1974-12-01

    CONTRACT OR GRANT NUMSERf»; F41609-7 l-C-0008 10 PROGRAM ELEMENT, PROJECT, TASK AREA a WORK UNIT NUMBERS 11230101 12. REPORT DATE...the alteratives should be reconsidered. Software, like Disneyland shoSd never be complete as long as there is creative imagination. Historically

  4. 76 FR 68381 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Pennsylvania Clean...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... period within which vehicle manufacturers could comply with the program's fleet average non-methane... year meets the specified phase-in requirements according to the fleet average non- methane hydrocarbon requirement for that year. The fleet average non- methane hydrocarbon emission limits become progressively...

  5. Comprehensive Truck Size and Weight (TS&W) Study. Phase 1-synthesis, working paper 8 : logistics and truck size and weight regulations

    DOT National Transportation Integrated Search

    2012-04-01

    This report presents the Safety Data Test Plan for the national evaluation of the Los Angeles County Congestion Reduction Demonstration (CRD) under the United States Department of Transportation (U.S. DOT) Urban Partnership Agreement (UPA) Program. T...

  6. AUTO PARTS MAN, WORKBOOK.

    ERIC Educational Resources Information Center

    DOVER, BUEL H.

    THE INFORMATION IN THIS STUDY GUIDE WAS DEVELOPED FOR USE IN THE RELATED TECHNICAL CLASSROOM INSTRUCTION PHASE OF THE AUTO PARTS MAN APPRENTICE TRAINING PROGRAM. THE MATERIAL WAS PLANNED UNDER THE DIRECTION OF THE STATE EDUCATIONAL ADVISORY COMMITTEE FOR THE AUTOMOTIVE TRADE. THE UNITS ARE (1) SCOPE AND OPPORTUNITY, (2) AREAS OF RESPONSIBILITY,…

  7. Homogeneous v. Heterogeneous: Is Tracking a Barrier to Equity?

    ERIC Educational Resources Information Center

    Polansky, Harvey B.

    1995-01-01

    Tracking has contributed considerably to the basic inequality of funding among American schools. To move to a heterogenous environment, districts must understand the concept of resource and program equity, commit to a planning process that allocates time and resources, provide ongoing inservice, downplay standardized test results, and phase-in…

  8. Handbook for Monitoring Industrial Wastewater.

    ERIC Educational Resources Information Center

    Associated Water & Air Resources Engineers, Inc., Nashville, TN.

    This manual for industrial wastewater monitoring covers the philosophy of monitoring needs, planning, sampling, measuring, and analysis. Sufficient detail is given for those who wish to explore more deeply some of the practical and theoretical aspects of any of the phases of a monitoring program. A logical procedure is suggested and direction…

  9. The Retirement Problem: A Positive Approach.

    ERIC Educational Resources Information Center

    AGB Reports, 1978

    1978-01-01

    A TIAA-CREF task force reports that there are steps an institution can take in dealing with the new mandatory retirement laws (not before age 70). They include preretirement counseling, provision of "Sweeteners," severance plans, a phased retirement program, and a continuing relationship with the college for retirees. (Author/LBH)

  10. Managerial Innovation: Rules for Successful Implementation.

    ERIC Educational Resources Information Center

    Baldridge, J. Victor

    1980-01-01

    The Higher Education Research Institute studied the impact of Exxon Foundation grants from the Resource Allocation and Management Program (RAMP) at 49 private colleges to determine if and how college planning and financial stability were affected by changes in management techniques. Rules for supporting innovations at various phases of a project's…

  11. Retirement Education Programs. Overview: ERIC Digest No. 29.

    ERIC Educational Resources Information Center

    Imel, Susan

    Retirement is a phenomenon of contemporary, industrialized nations. Retirement, which may be either voluntary or forced, generally refers to that phase in life when full-time, paid employment ceases. Depending on individual circumstances, it may be viewed as either a positive or negative event. Retirement planning and preparation are key factors…

  12. A Save-Energy, Save-Money Program That Pays Off

    ERIC Educational Resources Information Center

    Embersits, John F.

    1976-01-01

    Suggested guidelines for energy saving on campus include a 3-phase plan: (1) Quick Fix--effective management of what you already have; (2) Refitting--modification of existing systems and installation of simple controls; (3) Systems Convert--installation of computerized controls, waste-heat recovery, solid-waste recovery utilization and other…

  13. Hanford Waste End Effector Phase I Test Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berglin, Eric J.; Hatchell, Brian K.; Mount, Jason C.

    This test plan describes the Phase 1 testing program of the Hanford Waste End Effector (HWEE) at the Washington River Protection Solutions’ Cold Test Facility (CTF) using a Pacific Northwest National Laboratory (PNNL)-designed testing setup. This effort fulfills the informational needs for initial assessment of the HWEE to support Hanford single-shell tank A-105 retrieval. This task will install the HWEE on a PNNL-designed robotic gantry system at CTF, install and calibrate instrumentation to measure reaction forces and process parameters, prepare and characterize simulant materials, and implement the test program. The tests will involve retrieval of water, sludge, and hardpan simulantsmore » to determine pumping rate, dilution factors, and screen fouling rate.« less

  14. Pretest Predictions for Phase II Ventilation Tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yiming Sun

    The objective of this calculation is to predict the temperatures of the ventilating air, waste package surface, and concrete pipe walls that will be developed during the Phase II ventilation tests involving various test conditions. The results will be used as inputs to validating numerical approach for modeling continuous ventilation, and be used to support the repository subsurface design. The scope of the calculation is to identify the physical mechanisms and parameters related to thermal response in the Phase II ventilation tests, and describe numerical methods that are used to calculate the effects of continuous ventilation. The calculation is limitedmore » to thermal effect only. This engineering work activity is conducted in accordance with the ''Technical Work Plan for: Subsurface Performance Testing for License Application (LA) for Fiscal Year 2001'' (CRWMS M&O 2000d). This technical work plan (TWP) includes an AP-2.21Q, ''Quality Determinations and Planning for Scientific, Engineering, and Regulatory Compliance Activities'', activity evaluation (CRWMS M&O 2000d, Addendum A) that has determined this activity is subject to the YMP quality assurance (QA) program. The calculation is developed in accordance with the AP-3.12Q procedure, ''Calculations''. Additional background information regarding this activity is contained in the ''Development Plan for Ventilation Pretest Predictive Calculation'' (DP) (CRWMS M&O 2000a).« less

  15. Ahead with Cairo. Monitoring country activities.

    PubMed

    Danguilan, M; Wainer, J; Widyantoro, N; Capoor, I; Huq, N; Ashino, Y; Sadasivam, B; Le Thi Nham Tuyet

    1995-04-01

    In the aftermath of the 1994 UN Conference on Population and Development (ICPD) in Cairo, countries are proceeding with their implementation of the plan of action adopted at the conference. A brief description is given of some actions taken by specific countries toward plan implementation. In the Philippines meetings were held immediately after the conference in October on the implications for the Management, Family Planning, and Nongovernmental Organizations programs. The issues of concern were identified as the need for regular consultative meetings among relevant agencies, consultations with women's groups, and a responsive adolescents program. In Australia the program thrust was to focus on the implications for immigration. Monitoring of the plans of action will be undertaken by nongovernmental organizations (NGOs). In Malaysia committees are preparing a program of action suitable for implementation in Malaysia. A regional women's NGO organized a forum on the implications of ICPD for women's reproductive health, women's rights, and empowerment in Malaysia. In Vietnam, press conferences are used to communicate conference results. An NGO translated relevant ICPD materials into Vietnamese. In Indonesia, several ministries convened meetings among donors, NGOs, women's groups, and experts. In India, the government held a national conference. One view was that population issues should be discussed in the context of gender equality and empowerment of women. Another issue was the importance of placing reproductive health in the larger context of health and primary health services. Health personnel at all levels were considered in need of sensitization on gender issues. Problems such as anemia have not been successfully addressed in existing programs. The government agreed to remove in phases target driven programs and the sterilization emphasis. In Bangladesh, a national committee was formed, and NGOs are actively distributing information. In Japan, the Family Planning Federation in a collaborative effort is actively promoting concrete actions.

  16. The contributions and future direction of Program Science in HIV/STI prevention.

    PubMed

    Becker, Marissa; Mishra, Sharmistha; Aral, Sevgi; Bhattacharjee, Parinita; Lorway, Rob; Green, Kalada; Anthony, John; Isac, Shajy; Emmanuel, Faran; Musyoki, Helgar; Lazarus, Lisa; Thompson, Laura H; Cheuk, Eve; Blanchard, James F

    2018-01-01

    Program Science is an iterative, multi-phase research and program framework where programs drive the scientific inquiry, and both program and science are aligned towards a collective goal of improving population health. To achieve this, Program Science involves the systematic application of theoretical and empirical knowledge to optimize the scale, quality and impact of public health programs. Program Science tools and approaches developed for strategic planning, program implementation, and program management and evaluation have been incorporated into HIV and sexually transmitted infection prevention programs in Kenya, Nigeria, India, and the United States. In this paper, we highlight key scientific contributions that emerged from the growing application of Program Science in the field of HIV and STI prevention, and conclude by proposing future directions for Program Science.

  17. Developing a taxonomy for mission architecture definition

    NASA Technical Reports Server (NTRS)

    Neubek, Deborah J.

    1990-01-01

    The Lunar and Mars Exploration Program Office (LMEPO) was tasked to define candidate architectures for the Space Exploration Initiative to submit to NASA senior management and an externally constituted Outreach Synthesis Group. A systematic, structured process for developing, characterizing, and describing the alternate mission architectures, and applying this process to future studies was developed. The work was done in two phases: (1) national needs were identified and categorized into objectives achievable by the Space Exploration Initiative; and (2) a program development process was created which both hierarchically and iteratively describes the program planning process.

  18. Space Station Freedom - Approaching the critical design phase

    NASA Technical Reports Server (NTRS)

    Kohrs, Richard H.; Huckins, Earle, III

    1992-01-01

    The status and future developments of the Space Station Freedom are discussed. To date detailed design drawings are being produced to manufacture SSF hardware. A critical design review (CDR) for the man-tended capability configuration is planned to be performed in 1993 under the SSF program. The main objective of the CDR is to enable the program to make a full commitment to proceed to manufacture parts and assemblies. NASA recently signed a contract with the Russian space company, NPO Energia, to evaluate potential applications of various Russian space hardware for on-going NASA programs.

  19. Installation Restoration Program (Sites 1, 2, 3, 4, 5, 8, 13). Phase 4. Remedial Action Plan and Conceptual Documents, Edwards AFB, California

    DTIC Science & Technology

    1984-11-01

    R &D investigations. 1.3 PHASE IV SITE DESCRIPTIONS I Three primary sites are included in this Phase IV...34C z I L . ...- I I E I I i -\\ = _ _ _ . .. .....,. . .. .. I x FIGURE 1.7 a qq"-.. .. .. .. .. .. "- _ r JI I g I I1 ,n I , I I I " I - I Br-.,,-%~l...0 0 4J 4) 44 4) V ) -H 0 4 6: 144 d 0 4 14 404)-4 -4 4 .4 N ) 4 0 4) 𔃾 4 40 4) 4) 0.0

  20. Greenbelt Homes Pilot Program. Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiehagen, J.; Del Bianco, M.; Mallay, D.

    2015-05-22

    The U.S. Department of Energy Building America team Partnership for Home Innovation wrote a report on Phase 1 of the project that summarized a condition assessment of the homes and evaluated retrofit options within the constraints of the cooperative provided by GHI. Phase 2 was completed following monitoring in the 2013–2014 winter season; the results are summarized in this report. Phase 3 upgrades of heating equipment will be implemented in time for the 2014–2015 heating season and are not part of this report.

  1. Implementation of Benchmarking Transportation Logistics Practices and Future Benchmarking Organizations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thrower, A.W.; Patric, J.; Keister, M.

    2008-07-01

    The purpose of the Office of Civilian Radioactive Waste Management's (OCRWM) Logistics Benchmarking Project is to identify established government and industry practices for the safe transportation of hazardous materials which can serve as a yardstick for design and operation of OCRWM's national transportation system for shipping spent nuclear fuel and high-level radioactive waste to the proposed repository at Yucca Mountain, Nevada. The project will present logistics and transportation practices and develop implementation recommendations for adaptation by the national transportation system. This paper will describe the process used to perform the initial benchmarking study, highlight interim findings, and explain how thesemore » findings are being implemented. It will also provide an overview of the next phase of benchmarking studies. The benchmarking effort will remain a high-priority activity throughout the planning and operational phases of the transportation system. The initial phase of the project focused on government transportation programs to identify those practices which are most clearly applicable to OCRWM. These Federal programs have decades of safe transportation experience, strive for excellence in operations, and implement effective stakeholder involvement, all of which parallel OCRWM's transportation mission and vision. The initial benchmarking project focused on four business processes that are critical to OCRWM's mission success, and can be incorporated into OCRWM planning and preparation in the near term. The processes examined were: transportation business model, contract management/out-sourcing, stakeholder relations, and contingency planning. More recently, OCRWM examined logistics operations of AREVA NC's Business Unit Logistics in France. The next phase of benchmarking will focus on integrated domestic and international commercial radioactive logistic operations. The prospective companies represent large scale shippers and have vast experience in safely and efficiently shipping spent nuclear fuel and other radioactive materials. Additional business processes may be examined in this phase. The findings of these benchmarking efforts will help determine the organizational structure and requirements of the national transportation system. (authors)« less

  2. Core components of a comprehensive quality assurance program in anatomic pathology.

    PubMed

    Nakhleh, Raouf E

    2009-11-01

    In this article the core components of a comprehensive quality assurance and improvement plan are outlined. Quality anatomic pathology work comes with focus on accurate, timely, and complete reports. A commitment to continuous quality improvement and a systems approach with a persistent effort helps to achieve this end. Departments should have a quality assurance and improvement plan that includes a risk assessment of real and potential problems facing the laboratory. The plan should also list the individuals responsible for carrying out the program with adequate resources, a defined timetable, and annual assessment for progress and future directions. Quality assurance monitors should address regulatory requirements and be organized by laboratory division (surgical pathology, cytology, etc) as well as 5 segments (preanalytic, analytic, postanalytic phases of the test cycle, turn-around-time, and customer satisfaction). Quality assurance data can also be used to evaluate individual pathologists using multiple parameters with peer group comparison.

  3. Heavy liquid metals: Research programs at PSI

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Takeda, Y.

    1996-06-01

    The author describes work at PSI on thermohydraulics, thermal shock, and material tests for mechnical properties. In the presentation, the focus is on two main programs. (1) SINQ LBE target: The phase II study program for SINQ is planned. A new LBE loop is being constructed. The study has the following three objectives: (a) Pump study - design work on an electromagnetic pump to be integrated into the target. (b) Heat pipe performance test - the use of heat pipes as an additional component of the target cooling system is being considered, and it may be a way to futhermore » decouple the liquid metal and water coolant loops. (c) Mixed convection experiment - in order to find an optimal configuration of the additional flow guide for window cooling, mixed convection around the window is to be studied. The experiment will be started using water and then with LBE. (2) ESS Mercury target: For ESS target study, the following experimental studies are planned, some of which are exampled by trial experiments. (a) Flow around the window: Flow mapping around the hemi-cylindrical window will be made for optimising the flow channels and structures, (b) Geometry optimisation for minimizing a recirculation zone behind the edge of the flow separator, (c) Flow induced vibration and buckling problem for a optimised structure of the flow separator and (d) Gas-liquid two-phase flow will be studied by starting to establish the new experimental method of measuring various kinds of two-phase flow characteristics.« less

  4. Mission Applications Support at NASA: The Proposal Surface Water and Ocean Topography Mission

    NASA Astrophysics Data System (ADS)

    Srinivasan, Margaret; Peterson, Craig; Callahan, Phil

    2013-09-01

    The NASA Applied Sciences Program is actively supporting an agency-wide effort to formalize a mission-level data applications approach. The program goal is to engage early-phase NASA Earth satellite mission project teams with applied science representation in the flight mission planning process. The end objective is to "to engage applications-oriented users and organizations early in the satellite mission lifecycle to enable them to envision possible applications and integrate end-user needs into satellite mission planning as a way to increase the benefits to the nation."Two mission applications representatives have been selected for each early phase Tier 2 mission, including the Surface Water and Ocean Topography (SWOT) mission concept. These representatives are tasked with identifying and organizing the applications communities and developing and promoting a process for the mission to optimize the reach of existing applications efforts in order to enhance the applications value of the missions. An early project-level awareness of mission planning decisions that may increase or decrease the utility of data products to diverse user and potential user communities (communities of practice and communities of potential, respectively) has high value and potential return to the mission and to the users.Successful strategies to enhance science and practical applications of projected SWOT data streams will require engaging with and facilitating between representatives in the science, societal applications, and mission planning communities.Some of the elements of this program include:• Identify early adopters of data products• Coordinate applications team, including;Project Scientist, Payload Scientist, ProjectManager, data processing lead• Describe mission and products sufficiently inearly stage of development to effectively incorporate all potential usersProducts and activities resulting from this effort will include (but are not limited to); workshops, workshop summaries, web pages, email lists of interested users/scientists, an Applications Plan, printed materials (posters, brochures) and participation in key meetings.

  5. Phase 1 research program overview

    NASA Technical Reports Server (NTRS)

    Uri, J. J.; Lebedev, O. N.

    2001-01-01

    The Phase 1 research program was unprecedented in its scope and ambitious in its objectives. The National Aeronautics and Space Administration committed to conducting a multidisciplinary long-duration research program on a platform whose capabilities were not well known, not to mention belonging to another country. For the United States, it provided the first opportunity to conduct research in a long-duration space flight environment since the Skylab program in the 1970's. Multiple technical as well as cultural challenges were successfully overcome through the dedicated efforts of a relatively small cadre of individuals. The program developed processes to successfully plan, train for and execute research in a long-duration environment, with significant differences identified from short-duration space flight science operations. Between August 1994 and June 1998, thousands of kilograms of research hardware was prepared and launched to Mir, and thousands of kilograms of hardware and data products were returned to Earth. More than 150 Principal Investigators from eight countries were involved in the program in seven major research disciplines: Advanced Technology; Earth Sciences; Fundamental Biology; Human Life Sciences; International Space Station Risk Mitigation; Microgravity; and Space Sciences. Approximately 75 long-duration investigations were completed on Mir, with additional investigations performed on the Shuttle flights that docked with Mir. The flight phase included the participation of seven US astronauts and 20 Russian cosmonauts. The successful completion of the Phase 1 research program not only resulted in high quality science return but also in numerous lessons learned to make the ISS experience more productive. The cooperation developed during the program was instrumental in its success. c2001 AIAA. Published by Elsevier Science Ltd.

  6. Phase 1 research program overview.

    PubMed

    Uri, J J; Lebedev, O N

    2001-01-01

    The Phase 1 research program was unprecedented in its scope and ambitious in its objectives. The National Aeronautics and Space Administration committed to conducting a multidisciplinary long-duration research program on a platform whose capabilities were not well known, not to mention belonging to another country. For the United States, it provided the first opportunity to conduct research in a long-duration space flight environment since the Skylab program in the 1970's. Multiple technical as well as cultural challenges were successfully overcome through the dedicated efforts of a relatively small cadre of individuals. The program developed processes to successfully plan, train for and execute research in a long-duration environment, with significant differences identified from short-duration space flight science operations. Between August 1994 and June 1998, thousands of kilograms of research hardware was prepared and launched to Mir, and thousands of kilograms of hardware and data products were returned to Earth. More than 150 Principal Investigators from eight countries were involved in the program in seven major research disciplines: Advanced Technology; Earth Sciences; Fundamental Biology; Human Life Sciences; International Space Station Risk Mitigation; Microgravity; and Space Sciences. Approximately 75 long-duration investigations were completed on Mir, with additional investigations performed on the Shuttle flights that docked with Mir. The flight phase included the participation of seven US astronauts and 20 Russian cosmonauts. The successful completion of the Phase 1 research program not only resulted in high quality science return but also in numerous lessons learned to make the ISS experience more productive. The cooperation developed during the program was instrumental in its success. c2001 AIAA. Published by Elsevier Science Ltd.

  7. Technology transfer program: Perspective

    NASA Technical Reports Server (NTRS)

    Toyshov, A. J.

    1981-01-01

    Most of NASA's technology transfer activities are in the area of land use (development, suitability, and planning); forestry (including wildlife and range and vegetation inventories) agriculture related activities; and water resources. The technology dissemination function is exercised through three regional applications centers which are involved in 91 applications projects within 22 states. In addition there are approximately eight application system verification transfer (ASVT) projects, 21 university applications branches, institutionalized liason activities with public interest groups, and user requirements activities. As the result of budget cuts, the ASVT and user requirements and awareness programs are to be phased out at the end of FY81. The university applications programs are to be phased down and terminated by 1985. NASA will continue to work with the user more in an R & D and an applications development capacity, and not in a national scale or administrative way.

  8. Effects of virtual reality training using Nintendo Wii and treadmill walking exercise on balance and walking for stroke patients.

    PubMed

    Bang, Yo-Soon; Son, Kyung Hyun; Kim, Hyun Jin

    2016-11-01

    [Purpose] The purpose of this study is to investigate the effects of virtual reality training using Nintendo Wii on balance and walking for stroke patients. [Subjects and Methods] Forty stroke patients with stroke were randomly divided into two exercise program groups: virtual reality training (n=20) and treadmill (n=20). The subjects underwent their 40-minute exercise program three times a week for eight weeks. Their balance and walking were measured before and after the complete program. We measured the left/right weight-bearing and the anterior/posterior weight-bearing for balance, as well as stance phase, swing phase, and cadence for walking. [Results] For balance, both groups showed significant differences in the left/right and anterior/posterior weight-bearing, with significant post-program differences between the groups. For walking, there were significant differences in the stance phase, swing phase, and cadence of the virtual reality training group. [Conclusion] The results of this study suggest that virtual reality training providing visual feedback may enable stroke patients to directly adjust their incorrect weight center and shift visually. Virtual reality training may be appropriate for patients who need improved balance and walking ability by inducing their interest for them to perform planned exercises on a consistent basis.

  9. Effects of virtual reality training using Nintendo Wii and treadmill walking exercise on balance and walking for stroke patients

    PubMed Central

    Bang, Yo-Soon; Son, Kyung Hyun; Kim, Hyun Jin

    2016-01-01

    [Purpose] The purpose of this study is to investigate the effects of virtual reality training using Nintendo Wii on balance and walking for stroke patients. [Subjects and Methods] Forty stroke patients with stroke were randomly divided into two exercise program groups: virtual reality training (n=20) and treadmill (n=20). The subjects underwent their 40-minute exercise program three times a week for eight weeks. Their balance and walking were measured before and after the complete program. We measured the left/right weight-bearing and the anterior/posterior weight-bearing for balance, as well as stance phase, swing phase, and cadence for walking. [Results] For balance, both groups showed significant differences in the left/right and anterior/posterior weight-bearing, with significant post-program differences between the groups. For walking, there were significant differences in the stance phase, swing phase, and cadence of the virtual reality training group. [Conclusion] The results of this study suggest that virtual reality training providing visual feedback may enable stroke patients to directly adjust their incorrect weight center and shift visually. Virtual reality training may be appropriate for patients who need improved balance and walking ability by inducing their interest for them to perform planned exercises on a consistent basis. PMID:27942130

  10. Aerothermal modeling program, phase 1

    NASA Technical Reports Server (NTRS)

    Sturgess, G. J.

    1983-01-01

    The physical modeling embodied in the computational fluid dynamics codes is discussed. The objectives were to identify shortcomings in the models and to provide a program plan to improve the quantitative accuracy. The physical models studied were for: turbulent mass and momentum transport, heat release, liquid fuel spray, and gaseous radiation. The approach adopted was to test the models against appropriate benchmark-quality test cases from experiments in the literature for the constituent flows that together make up the combustor real flow.

  11. Satellite services system program plan

    NASA Technical Reports Server (NTRS)

    Hoffman, Stephen J.

    1985-01-01

    The purpose is to determine the potential for servicing from the Space Shuttle Orbiter and to assess NASA's role as the catalyst in bringing about routine on-orbit servicing. Specifically this study seeks to determine what requirements, in terms of both funds and time, are needed to make the Shuttle Orbiter not only a transporter of spacecraft but a servicing vehicle for those spacecraft as well. The scope of this effort is to focus on the near term development of a generic servicing capability. To make this capability truly generic and attractive requires that the customer's point of veiw be taken and transformed into a widely usable set of hardware. And to maintain a near term advent of this capability requires that a minimal reliance be made on advanced technology. With this background and scope, this study will proceed through three general phases to arrive at the desired program costs and schedule. The first step will be to determine the servicing requirements of the user community. This will provide the basis for the second phase which is to develop hardware concepts to meet these needs. Finally, a cost estimate will be made for each of the new hardware concepts and a phased hardware development plan will be established for the acquisition of these items based on the inputs obtained from the user community.

  12. Achieving Maximum Integration Utilizing Requirements Flow Down

    NASA Technical Reports Server (NTRS)

    Archiable, Wes; Askins, Bruce

    2011-01-01

    A robust and experienced systems engineering team is essential for a successful program. It is often a challenge to build a core systems engineering team early enough in a program to maximize integration and assure a common path for all supporting teams in a project. Ares I was no exception. During the planning of IVGVT, the team had many challenges including lack of: early identification of stakeholders, team training in NASA s system engineering practices, solid requirements flow down and a top down documentation strategy. The IVGVT team started test planning early in the program before the systems engineering framework had been matured due to an aggressive schedule. Therefore the IVGVT team increased their involvement in the Constellation systems engineering effort. Program level requirements were established that flowed down to IVGVT aligning all stakeholders to a common set of goals. The IVGVT team utilized the APPEL REQ Development Management course providing the team a NASA focused model to follow. The IVGVT team engaged directly with the model verification and validation process to assure that a solid set of requirements drove the need for the test event. The IVGVT team looked at the initial planning state, analyzed the current state and then produced recommendations for the ideal future state of a wide range of systems engineering functions and processes. Based on this analysis, the IVGVT team was able to produce a set of lessons learned and to provide suggestions for future programs or tests to use in their initial planning phase.

  13. Development of the simulation system {open_quotes}IMPACT{close_quotes} for analysis of nuclear power plant severe accidents

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Naitoh, Masanori; Ujita, Hiroshi; Nagumo, Hiroichi

    1997-07-01

    The Nuclear Power Engineering Corporation (NUPEC) has initiated a long-term program to develop the simulation system {open_quotes}IMPACT{close_quotes} for analysis of hypothetical severe accidents in nuclear power plants. IMPACT employs advanced methods of physical modeling and numerical computation, and can simulate a wide spectrum of senarios ranging from normal operation to hypothetical, beyond-design-basis-accident events. Designed as a large-scale system of interconnected, hierarchical modules, IMPACT`s distinguishing features include mechanistic models based on first principles and high speed simulation on parallel processing computers. The present plan is a ten-year program starting from 1993, consisting of the initial one-year of preparatory work followed bymore » three technical phases: Phase-1 for development of a prototype system; Phase-2 for completion of the simulation system, incorporating new achievements from basic studies; and Phase-3 for refinement through extensive verification and validation against test results and available real plant data.« less

  14. Planning and Administration of National Literacy Programmes: The Indian Experience.

    ERIC Educational Resources Information Center

    Bordia, Anil

    In reporting the history and status of the National Adult Education Programme of India (NAEP), a five-year literacy campaign (1979-84) that was designed to educate approximately 100 million persons, this study emphasizes the program's preparatory phase and its monitoring/evaluation systems. After a survey of the literacy needs and past literacy…

  15. 78 FR 44142 - Modification of Two National Customs Automation Program (NCAP) Tests Concerning Automated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ... efforts are accomplished through phased releases of ACE component functionality designed to introduce new... designed to evaluate planned components of the NCAP. This test is authorized pursuant to Sec. 101.9(b) of... import meat, poultry, or egg products or ``Samples for Laboratory Examination, Research, Evaluative...

  16. Spatial Analysis for Monitoring Forest Health

    Treesearch

    Francis A. Roesch

    1994-01-01

    A plan for the spatial analysis for the sample design for the detection monitoring phase in the joint USDA Forest Service/EPA Forest Health Monitoring Program (FHM) in the United States is discussed. The spatial analysis procedure is intended to more quickly identify changes in forest health by providing increased sensitivity to localized changes. The procedure is...

  17. Orbit Transfer Vehicle (OTV) engine phase A study, extension 1. Volume 3: Study cost estimates

    NASA Technical Reports Server (NTRS)

    Christensen, K. L.

    1980-01-01

    Program cost and planning data based on 1980 technology and shown in 1979 dollars for a 20K lb Thrust Staged Combustion Cycle Engine are presented. These data were compared with those for the Advanced Expander Cycle Engine at 10K lb and 20K lb thrust levels.

  18. When Push Comes to Shove: Enacting Demonstration Programs at the Local Level.

    ERIC Educational Resources Information Center

    Kagan, Sharon L.

    This paper explores, from the perspective of a local practitioner, phases and effects of implementing a national education demonstration project at the local level. The pivotal role of the locality, its history and its economic realities, is emphasized. Drawing from her experience in planning and implementing a demonstration effort in a…

  19. Flight Planning for the International Space Station-Levitation Observation of Dendrite Evolution in Steel Ternary Alloy Rapid Solidification

    NASA Technical Reports Server (NTRS)

    Flemings, M. C.; Matson, D. M.; Loser, W.; Hyers, R. W.; Rogers, J. R.; Curreri, Peter A. (Technical Monitor)

    2002-01-01

    The paper is an overview of the status and science for the LODESTARS (Levitation Observation of Dendrite Evolution in Steel Ternary Alloy Rapid Solidification) research project. The program is aimed at understanding how melt convection influences phase selection and the evolution of rapid solidification microstructures.

  20. Achieving Common Expectations for Overall Goals amid Diversity among Cooperative Extension Faculty.

    ERIC Educational Resources Information Center

    Taylor, Barbara

    As a part of the initial phase of a strategic planning effort for the development of Florida's 1988 through 1991 long-range cooperative extension program, an effort was initiated to achieve common expectations for overall organizational mission and purpose among diverse cooperative extension faculty. The unification effort included the following…

  1. Space Transportation Engine Program (STEP), phase B

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The Space Transportation Engine Program (STEP) Phase 2 effort includes preliminary design and activities plan preparation that will allow smooth and time transition into a Prototype Phase and then into Phases 3, 4, and 5. A Concurrent Engineering approach using Total Quality Management (TQM) techniques, is being applied to define an oxygen-hydrogen engine. The baseline from Phase 1/1' studies was used as a point of departure for trade studies and analyses. Existing STME system models are being enhanced as more detailed module/component characteristics are determined. Preliminary designs for the open expander, closed expander, and gas generator cycles were prepared, and recommendations for cycle selection made at the Design Concept Review (DCR). As a result of July '90 DCR, and information subsequently supplied to the Technical Review Team, a gas generator cycle was selected. Results of the various Advanced Development Programs (ADP's) for the Advanced Launch Systems (ALS) were contributive to this effort. An active vehicle integration effort is supplying the NASA, Air Force, and vehicle contractors with engine parameters and data, and flowing down appropriate vehicle requirements. Engine design and analysis trade studies are being documented in a data base that was developed and is being used to organize information. To date, seventy four trade studies were input to the data base.

  2. Developing high-quality educational software.

    PubMed

    Johnson, Lynn A; Schleyer, Titus K L

    2003-11-01

    The development of effective educational software requires a systematic process executed by a skilled development team. This article describes the core skills required of the development team members for the six phases of successful educational software development. During analysis, the foundation of product development is laid including defining the audience and program goals, determining hardware and software constraints, identifying content resources, and developing management tools. The design phase creates the specifications that describe the user interface, the sequence of events, and the details of the content to be displayed. During development, the pieces of the educational program are assembled. Graphics and other media are created, video and audio scripts written and recorded, the program code created, and support documentation produced. Extensive testing by the development team (alpha testing) and with students (beta testing) is conducted. Carefully planned implementation is most likely to result in a flawless delivery of the educational software and maintenance ensures up-to-date content and software. Due to the importance of the sixth phase, evaluation, we have written a companion article on it that follows this one. The development of a CD-ROM product is described including the development team, a detailed description of the development phases, and the lessons learned from the project.

  3. The STAR Detector Upgrades and Electromagnetic Probes in Beam Energy Scan Phase II

    NASA Astrophysics Data System (ADS)

    Yang, Chi

    The Beam Energy Scan Phase II at RHIC, BES-II, is scheduled from year 2019 to 2020 and will explore the high baryon density region of the QCD phase diagram with high precision. The program will focus on the interesting energy region determined from the results of BES-I. Some of the key measurements anticipated are the chiral symmetry restoration and QGP thermal radiation in the dilepton and direct photon channels. The measurements will be possible with an order of magnitude better statistics provided by the electron cooling upgrade of RHIC and with the detector upgrades planned to extend STAR experimental reach. The upgrades are: the inner Time Projection Chamber sectors (iTPC), the Event Plane Detector (EPD), and the end-cap Time of Flight (eTOF). We present the BES-II program details and the physics opportunities in the dilepton and direct photon channels enabled by the upgrades.

  4. Site Safety and Health Plan (Phase 3) for the treatability study for in situ vitrification at Seepage Pit 1 in Waste Area Grouping 7, Oak Ridge National Laboratory, Oak Ridge, TN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spalding, B.P.; Naney, M.T.

    1995-06-01

    This plan is to be implemented for Phase III ISV operations and post operations sampling. Two previous project phases involving site characterization have been completed and required their own site specific health and safety plans. Project activities will take place at Seepage Pit 1 in Waste Area Grouping 7 at ORNL, Oak Ridge, Tennessee. Purpose of this document is to establish standard health and safety procedures for ORNL project personnel and contractor employees in performance of this work. Site activities shall be performed in accordance with Energy Systems safety and health policies and procedures, DOE orders, Occupational Safety and Healthmore » Administration Standards 29 CFR Part 1910 and 1926; applicable United States Environmental Protection Agency requirements; and consensus standards. Where the word ``shall`` is used, the provisions of this plan are mandatory. Specific requirements of regulations and orders have been incorporated into this plan in accordance with applicability. Included from 29 CFR are 1910.120 Hazardous Waste Operations and Emergency Response; 1910.146, Permit Required - Confined Space; 1910.1200, Hazard Communication; DOE Orders requirements of 5480.4, Environmental Protection, Safety and Health Protection Standards; 5480.11, Radiation Protection; and N5480.6, Radiological Control Manual. In addition, guidance and policy will be followed as described in the Environmental Restoration Program Health and Safety Plan. The levels of personal protection and the procedures specified in this plan are based on the best information available from reference documents and site characterization data. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project.« less

  5. Plan for the design, development, and implementation, and operation of the National Water Information System

    USGS Publications Warehouse

    Edwards, M.D.

    1987-01-01

    The Water Resources Division of the U.S. Geological Survey is developing a National Water Information System (NWIS) that will integrate and replace its existing water data and information systems of the National Water Data Storage and Retrieval System, National Water Data Exchange, National Water-Use Information, and Water Resources Scientific Information Center programs. It will be a distributed data system operated as part of the Division 's Distributed Information System, which is a network of computers linked together through a national telecommunication network known as GEONET. The NWIS is being developed as a series of prototypes that will be integrated as they are completed to allow the development and implementation of the system in a phased manner. It also is being developed in a distributed manner using personnel who work under the coordination of a central NWIS Project Office. Work on the development of the NWIS began in 1983 and it is scheduled for completion in 1990. This document presents an overall plan for the design, development, implementation, and operation of the system. Detailed discussions are presented on each of these phases of the NWIS life cycle. The planning, quality assurance, and configuration management phases of the life cycle also are discussed. The plan is intended to be a working document for use by NWIS management and participants in its design and development and to assist offices of the Division in planning and preparing for installation and operation of the system. (Author 's abstract)

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cheung, Michael L M; Chan, Anthony T C; The Chinese University of Hong Kong

    Purpose: To develop a formulation for 4D treatment planning for a tumour tracking volumetric modulated arc therapy treatment (VMAT) plan for lung cancer. Methods: A VMAT plan was optimized based on a reference phase of the 4DCT of a lung cancer patient. The PTV was generated from the GTV of the reference phase. The collimator angle was set to 90 degrees such that the MLC travels along superior-inferior direction which is the main component of movement of a lung tumour. Then, each control point of the VMAT plan was assigned to a particular phase of the 4DCT in chronological order.more » The MLC positions of each control point were shifted according to the position of the tumour centroid of its assigned phase to form a tumour tracking VMAT plan. The control points of the same phase were grouped to form a pseudo VMAT plan for that particular phase. Dose calculation was performed for each pseudo VMAT plan on the corresponding phase of the 4DCT. The CTs of all phases were registered to the reference phase CT according to the displacement of the tumour centroid. The individual dose distributions of the pseudo VMAT plans were summed up and displayed on the reference phase of the 4DCT. A control VMAT plan was optimized based on a PTV generated from the ITV of all phases and compared with the tumour tracking VMAT plan. Results: Both plans achieved >95% volume coverage at the prescription dose level (96% for the tumour tracking plan and 97% for the control plan). But the normal lung volume irradiated at the prescription dose level was 39% less for the tumour tracking plan than the control plan. Conclusion: A formulation of 4D treatment planning for tumour tracking VMAT plans for lung cancer was developed.« less

  7. Health-Based Capitation Risk Adjustment in Minnesota Public Health Care Programs

    PubMed Central

    Gifford, Gregory A.; Edwards, Kevan R.; Knutson, David J.

    2004-01-01

    This article documents the history and implementation of health-based capitation risk adjustment in Minnesota public health care programs, and identifies key implementation issues. Capitation payments in these programs are risk adjusted using an historical, health plan risk score, based on concurrent risk assessment. Phased implementation of capitation risk adjustment for these programs began January 1, 2000. Minnesota's experience with capitation risk adjustment suggests that: (1) implementation can accelerate encounter data submission, (2) administrative decisions made during implementation can create issues that impact payment model performance, and (3) changes in diagnosis data management during implementation may require changes to the payment model. PMID:25372356

  8. Apollo/Skylab suit program management systems study. Volume 2: Cost analysis

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The business management methods employed in the performance of the Apollo-Skylab Suit Program are studied. The data accumulated over the span of the contract as well as the methods used to accumulate the data are examined. Management methods associated with the monitoring and control of resources applied towards the performance of the contract are also studied and recommended upon. The primary objective is the compilation, analysis, and presentation of historical cost performance criteria. Cost data are depicted for all phases of the Apollo-Skylab program in common, meaningful terms, whereby the data may be applicable to future suit program planning efforts.

  9. Development of a unified guidance system for geocentric transfer. [for solar electric propulsion spacecraft

    NASA Technical Reports Server (NTRS)

    Cake, J. E.; Regetz, J. D., Jr.

    1975-01-01

    A method is presented for open loop guidance of a solar electric propulsion spacecraft to geosynchronous orbit. The method consists of determining the thrust vector profiles on the ground with an optimization computer program, and performing updates based on the difference between the actual trajectory and that predicted with a precision simulation computer program. The motivation for performing the guidance analysis during the mission planning phase is discussed, and a spacecraft design option that employs attitude orientation constraints is presented. The improvements required in both the optimization program and simulation program are set forth, together with the efforts to integrate the programs into the ground support software for the guidance system.

  10. Development of a unified guidance system for geocentric transfer. [solar electric propulsion spacecraft

    NASA Technical Reports Server (NTRS)

    Cake, J. E.; Regetz, J. D., Jr.

    1975-01-01

    A method is presented for open loop guidance of a solar electric propulsion spacecraft to geosynchronsus orbit. The method consists of determining the thrust vector profiles on the ground with an optimization computer program, and performing updates based on the difference between the actual trajectory and that predicted with a precision simulation computer program. The motivation for performing the guidance analysis during the mission planning phase is discussed, and a spacecraft design option that employs attitude orientation constraints is presented. The improvements required in both the optimization program and simulation program are set forth, together with the efforts to integrate the programs into the ground support software for the guidance system.

  11. Feasibility study of an Integrated Program for Aerospace vehicle Design (IPAD). Volume 6: IPAD system development and operation

    NASA Technical Reports Server (NTRS)

    Redhed, D. D.; Tripp, L. L.; Kawaguchi, A. S.; Miller, R. E., Jr.

    1973-01-01

    The strategy of the IPAD implementation plan presented, proposes a three phase development of the IPAD system and technical modules, and the transfer of this capability from the development environment to the aerospace vehicle design environment. The system and technical module capabilities for each phase of development are described. The system and technical module programming languages are recommended as well as the initial host computer system hardware and operating system. The cost of developing the IPAD technology is estimated. A schedule displaying the flowtime required for each development task is given. A PERT chart gives the developmental relationships of each of the tasks and an estimate of the operational cost of the IPAD system is offered.

  12. Determinants of Malaria Program Expenditures during Elimination: Case Study Evidence from Select Provinces in the Philippines

    PubMed Central

    Liu, Jenny X.; Newby, Gretchen; Brackery, Aprielle; Smith Gueye, Cara; Candari, Christine J.; Escubil, Luz R.; Vestergaard, Lasse S.; Baquilod, Mario

    2013-01-01

    ...Even though eliminating malaria from the endemic margins is a part of the Global Malaria Action Plan, little guidance exists on what resources are needed to transition from controlling malaria to eliminating it. Using Philippines as an example, this study aimed to (1) estimate the financial resources used by sub-national malaria programs in different phases during elimination and (2) understand how different environmental and organizational factors may influence expenditure levels and spending proportions. The Philippines provides an opportunity to study variations in sub-national programs because its epidemiological and ecological diversity, devolved health system, and progressive elimination strategy all allow greater flexibility for lower-level governments to direct activities, but also create challenges for coordination and resource mobilization. Through key informant interviews and archival record retrieval in four selected provinces chosen based on eco-epidemiological variation, expenditures associated with provincial malaria programs were collected for selected years (mid-1990s to 2010). Results show that expenditures per person at risk per year decrease as programs progress from a state of controlled low-endemic malaria to elimination to prevention of reintroduction regardless of whether elimination was deliberately planned. However, wide variation across provinces were found: expenditures were generally higher if mainly financed with donor grants, but were moderated by the level of economic development, the level of malaria transmission and receptivity, and the capacity of program staff. Across all provinces, strong leadership appears to be a necessary condition for maintaining progress and is vital in controlling outbreaks. While sampled provinces and years may not be representative of other sub-national malaria programs, these findings suggest that the marginal yearly cost declines with each phase during elimination. PMID:24086279

  13. Determinants of malaria program expenditures during elimination: case study evidence from select provinces in the Philippines.

    PubMed

    Liu, Jenny X; Newby, Gretchen; Brackery, Aprielle; Smith Gueye, Cara; Candari, Christine J; Escubil, Luz R; Vestergaard, Lasse S; Baquilod, Mario

    2013-01-01

    ...Even though eliminating malaria from the endemic margins is a part of the Global Malaria Action Plan, little guidance exists on what resources are needed to transition from controlling malaria to eliminating it. Using Philippines as an example, this study aimed to (1) estimate the financial resources used by sub-national malaria programs in different phases during elimination and (2) understand how different environmental and organizational factors may influence expenditure levels and spending proportions. The Philippines provides an opportunity to study variations in sub-national programs because its epidemiological and ecological diversity, devolved health system, and progressive elimination strategy all allow greater flexibility for lower-level governments to direct activities, but also create challenges for coordination and resource mobilization. Through key informant interviews and archival record retrieval in four selected provinces chosen based on eco-epidemiological variation, expenditures associated with provincial malaria programs were collected for selected years (mid-1990s to 2010). Results show that expenditures per person at risk per year decrease as programs progress from a state of controlled low-endemic malaria to elimination to prevention of reintroduction regardless of whether elimination was deliberately planned. However, wide variation across provinces were found: expenditures were generally higher if mainly financed with donor grants, but were moderated by the level of economic development, the level of malaria transmission and receptivity, and the capacity of program staff. Across all provinces, strong leadership appears to be a necessary condition for maintaining progress and is vital in controlling outbreaks. While sampled provinces and years may not be representative of other sub-national malaria programs, these findings suggest that the marginal yearly cost declines with each phase during elimination.

  14. Design for effective development and prototyping of the HL-20

    NASA Astrophysics Data System (ADS)

    Urie, David M.; Floreck, Paul A.; McMorris, John A.; Elvin, John D.

    1993-10-01

    A feasibility study of the HL-20 personnel launch system (PLS) concept was conducted by a team which focused on creating a PLS design approach and an accelerated development plan consistent with the historical 'Skunk Works' approach to rapid prototyping. Technical design, manufacturing, system testing, and operations and support elements of the predefined baseline concept were evaluated. An initial phase program, featuring a concurrent system test during design and development, leading to the orbital flight of an unmanned HL-20 prototype on a Titan III launch system, was prescribed. A second-phase development and manufacturing plan leading to system operational status was also formulated. Baseline design feature modifications were made when necessary, without compromise to performance, to satisfy the prototype development plan. Technical design details and off-the-shelf hardware candidates were also identified for several subsystems, including the launch-system interface adapter/emergency escape system. The technical feasibility of the system and applicability of the Skunk Works approach to development of the HL-20/PLS were verified.

  15. Descriptive Model of Generic WAMS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hauer, John F.; DeSteese, John G.

    The Department of Energy’s (DOE) Transmission Reliability Program is supporting the research, deployment, and demonstration of various wide area measurement system (WAMS) technologies to enhance the reliability of the Nation’s electrical power grid. Pacific Northwest National Laboratory (PNNL) was tasked by the DOE National SCADA Test Bed Program to conduct a study of WAMS security. This report represents achievement of the milestone to develop a generic WAMS model description that will provide a basis for the security analysis planned in the next phase of this study.

  16. Space shuttle solid rocket booster recovery system definition, volume 1

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The performance requirements, preliminary designs, and development program plans for an airborne recovery system for the space shuttle solid rocket booster are discussed. The analyses performed during the study phase of the program are presented. The basic considerations which established the system configuration are defined. A Monte Carlo statistical technique using random sampling of the probability distribution for the critical water impact parameters was used to determine the failure probability of each solid rocket booster component as functions of impact velocity and component strength capability.

  17. NASA presentation. [wind energy conversion systems planning

    NASA Technical Reports Server (NTRS)

    Thomas, R. L.

    1973-01-01

    The development of a wind energy system is outlined that supplies reliable energy at a cost competitive with other energy systems. A government directed industry program with strong university support is recommended that includes meteorological studies to estimate wind energy potentials and determines favorable regions and sites for wind power installations. Key phases of the overall program are wind energy conversion systems, meteorological wind studies, energy storage systems, and environmental impact studies. Performance testing with a prototype wind energy conversion and storage system is projected for Fiscal 1977.

  18. Fault-Tolerant Systems Technology Program Plan: A Concentrated, Prioritized, and Phased R&D Program is Proposed for the Development of the Technology.

    DTIC Science & Technology

    1977-08-01

    inadequacy of specifications, the undeveloped state of applicable techniques, and fragmentation of effort among disciplines. It recommends the development...of the technology and routine application to system acquisition. It describes major projects within the discipline and summarizes the state of the art...tolerance may be an unnecessary refinement in one application , merely desirable in a second, and essential in the third. In a mission-critical system

  19. Deep Throttle Turbopump Technology Testing

    NASA Technical Reports Server (NTRS)

    Ferguson, T. V.; Guinzburg, A.; McGlynn, R. D.; Williams, M.

    2002-01-01

    The objectives of this viewgraph presentation were to: (1) enhance and demonstrate critical technologies in support of planned RBCC flight test programs; and (2) obtain knowledge of wide flow range as it is applicable to liquid rocket engine turbopumps operating over extreme throttle ranges. This program was set up to demonstrate wide flow range diffuser technologies. The testing phase of the contract to provide data to anchor initial designs was partially successful. Data collected suggest flow phenomena exists at off-design flow rates.

  20. Adapting industry-style business model to academia in a system of Performance-based Incentive Compensation.

    PubMed

    Reece, E Albert; Nugent, Olan; Wheeler, Richard P; Smith, Charles W; Hough, Aubrey J; Winter, Charles

    2008-01-01

    Performance-Based Incentive Compensation (PBIC) plans currently prevail throughout industry and have repeatedly demonstrated effectiveness as powerful motivational tools for attracting and retaining top talent, enhancing key indicators, increasing employee productivity, and, ultimately, enhancing mission-based parameters. The University of Arkansas for Medical Sciences (UAMS) College of Medicine introduced its PBIC plan to further the transition of the college to a high-performing academic and clinical enterprise. A forward-thinking compensation plan was progressively implemented during a three-year period. After the introduction of an aggressive five-year vision plan in 2002, the college introduced a PBIC plan designed to ensure the retention and recruitment of high-quality faculty through the use of uncapped salaries that reflect each faculty member's clinical, research, and education duties. The PBIC plan was introduced with broad, schoolwide principles adaptable to each department and purposely flexible to allow for tailor-made algorithms to fit the specific approaches required by individual departments. As of July 2006, the college had begun to reap a variety of short-term benefits from Phase I of its PBIC program, including increases in revenue and faculty salaries, and increased faculty morale and satisfaction.Successful implementation of a PBIC plan depends on a host of factors, including the development of a process for evaluating performance that is considered fair and reliable to the entire faculty. The college has become more efficient and effective by adopting such a program, which has helped it to increase overall productivity. The PBIC program continues to challenge our faculty members to attain their highest potential while rewarding them accordingly.

  1. Overview and R&D Test Planning for the Joint U.S./ROK R&D and Test Program for New Underground Ammunition Storage Technologies

    DTIC Science & Technology

    1992-08-01

    KOREA THIS YEAR. OUR SEXT U.S. WEETIIG IS SCIIEDULED FOR THE FIRST WEEK OF DECEMBER 1992 AT SOCORRO, NEW MEXICO . In In - NAME 3 DR. CHESTER E...IS PLANNING TO USE EXISTING MINES WITH MODlFlCATlQNS IN NEW MEXICO = ROK HAS GEO-A ISLAND JUST OFF THE PENINSULA 19 NARRATIVE PHASE 3 VUGRAPH 19...TECHNICAL HANAGER HAS LOCATED A SITE NTEAR HAGDALEHA (SOCORRO COUIiTY), NEW MEXICO , THAT FULLY MEETS PLMBPD TBST REQUIREHEHTS. THE SITE IS A

  2. National Program for Inspection of Non-Federal Dams. Congamond Lakes North Dike (MA 00072), Connecticut River Basin, Southwick, Massachusetts. Phase I Inspection Report.

    DTIC Science & Technology

    1980-08-01

    erosion resistant surface should be designed and con - structed on the downstream face after trees and trash have been removed. The owner should also...made by the Division of Waterways to con - struct a drop inlet spillway at North Dike in order to provide a more constant iake level. Plans (12 sheets...provide a more constant lake level. Plans (12 sheets) for this pro - * posal were prepared for the Division of Waterways by Robert G. Brown & Associ

  3. Research on large equipment maintenance system in life cycle

    NASA Astrophysics Data System (ADS)

    Xu, Xiaowei; Wang, Hongxia; Liu, Zhenxing; Zhang, Nan

    2017-06-01

    In order to change the current disadvantages of traditional large equipment maintenance concept, this article plans to apply the technical method of prognostics and health management to optimize equipment maintenance strategy and develop large equipment maintenance system. Combined with the maintenance procedures of various phases in life cycle, it concluded the formulation methods of maintenance program and implement plans of maintenance work. In the meantime, it takes account into the example of the dredger power system of the Waterway Bureau to establish the auxiliary platform of ship maintenance system in life cycle.

  4. Research & Development of Materials/Processing Methods for Continuous Fiber Ceramic Composites (CFCC) Phase 2 Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Szweda, A.

    2001-01-01

    The Department of Energy's Continuous Fiber Ceramic Composites (CFCC) Initiative that begun in 1992 has led the way for Industry, Academia, and Government to carry out a 10 year R&D plan to develop CFCCs for these industrial applications. In Phase II of this program, Dow Corning has led a team of OEM's, composite fabricators, and Government Laboratories to develop polymer derived CFCC materials and processes for selected industrial applications. During this phase, Dow Corning carried extensive process development and representative component demonstration activities on gas turbine components, chemical pump components and heat treatment furnace components.

  5. NASA's Space Launch System Advanced Booster Engineering Demonstration and/or Risk Reduction Efforts

    NASA Technical Reports Server (NTRS)

    Crumbly, Christopher M.; Dumbacher, Daniel L.; May, Todd A.

    2012-01-01

    The National Aeronautics and Space Administration (NASA) formally initiated the Space Launch System (SLS) development in September 2011, with the approval of the program s acquisition plan, which engages the current workforce and infrastructure to deliver an initial 70 metric ton (t) SLS capability in 2017, while using planned block upgrades to evolve to a full 130 t capability after 2021. A key component of the acquisition plan is a three-phased approach for the first stage boosters. The first phase is to complete the development of the Ares and Space Shuttle heritage 5-segment solid rocket boosters (SRBs) for initial exploration missions in 2017 and 2021. The second phase in the booster acquisition plan is the Advanced Booster Risk Reduction and/or Engineering Demonstration NASA Research Announcement (NRA), which was recently awarded after a full and open competition. The NRA was released to industry on February 9, 2012, with a stated intent to reduce risks leading to an affordable advanced booster and to enable competition. The third and final phase will be a full and open competition for Design, Development, Test, and Evaluation (DDT&E) of the advanced boosters. There are no existing boosters that can meet the performance requirements for the 130 t class SLS. The expected thrust class of the advanced boosters is potentially double the current 5-segment solid rocket booster capability. These new boosters will enable the flexible path approach to space exploration beyond Earth orbit (BEO), opening up vast opportunities including near-Earth asteroids, Lagrange Points, and Mars. This evolved capability offers large volume for science missions and payloads, will be modular and flexible, and will be right-sized for mission requirements. NASA developed the Advanced Booster Engineering Demonstration and/or Risk Reduction NRA to seek industry participation in reducing risks leading to an affordable advanced booster that meets the SLS performance requirements. Demonstrations and/or risk reduction efforts were required to be related to a proposed booster concept directly applicable to fielding an advanced booster. This paper will discuss, for the first time publicly, the contract awards and how NASA intends to use the data from these efforts to prepare for the planned advanced booster DDT&E acquisition as the SLS Program moves forward with competitively procured affordable performance enhancements.

  6. NASA's Space Launch System Advanced Booster Engineering Demonstration and Risk Reduction Efforts

    NASA Technical Reports Server (NTRS)

    Crumbly, Christopher M.; May, Todd; Dumbacher, Daniel

    2012-01-01

    The National Aeronautics and Space Administration (NASA) formally initiated the Space Launch System (SLS) development in September 2011, with the approval of the program s acquisition plan, which engages the current workforce and infrastructure to deliver an initial 70 metric ton (t) SLS capability in 2017, while using planned block upgrades to evolve to a full 130 t capability after 2021. A key component of the acquisition plan is a three-phased approach for the first stage boosters. The first phase is to complete the development of the Ares and Space Shuttle heritage 5-segment solid rocket boosters for initial exploration missions in 2017 and 2021. The second phase in the booster acquisition plan is the Advanced Booster Risk Reduction and/or Engineering Demonstration NASA Research Announcement (NRA), which was recently awarded after a full and open competition. The NRA was released to industry on February 9, 2012, and its stated intent was to reduce risks leading to an affordable Advanced Booster and to enable competition. The third and final phase will be a full and open competition for Design, Development, Test, and Evaluation (DDT&E) of the Advanced Boosters. There are no existing boosters that can meet the performance requirements for the 130 t class SLS. The expected thrust class of the Advanced Boosters is potentially double the current 5-segment solid rocket booster capability. These new boosters will enable the flexible path approach to space exploration beyond Earth orbit, opening up vast opportunities including near-Earth asteroids, Lagrange Points, and Mars. This evolved capability offers large volume for science missions and payloads, will be modular and flexible, and will be right-sized for mission requirements. NASA developed the Advanced Booster Engineering Demonstration and/or Risk Reduction NRA to seek industry participation in reducing risks leading to an affordable Advanced Booster that meets the SLS performance requirements. Demonstrations and/or risk reduction efforts were required to be related to a proposed booster concept directly applicable to fielding an Advanced Booster. This paper will discuss, for the first time publicly, the contract awards and how NASA intends to use the data from these efforts to prepare for the planned Advanced Booster DDT&E acquisition as the SLS Program moves forward with competitively procured affordable performance enhancements.

  7. Space reactor power 1986 - A year of choices and transition

    NASA Technical Reports Server (NTRS)

    Wiley, R. L.; Verga, R. L.; Schnyer, A. D.; Sholtis, J. A., Jr.; Wahlquist, E. J.

    1986-01-01

    Both the SP-100 and Multimegawatt programs have made significant progress over the last year and that progress is the focus of this paper. In the SP-100 program the thermoelectric energy conversion concept powered by a compact, high-temperature, lithium-cooled, uranium-nitride-fueled fast spectrum reactor was selected for engineering development and ground demonstration testing at an electrical power level of 300 kilowatts. In the Multimegawatt program, activities moved from the planning phase into one of technology development and assessment with attendant preliminary definition and evaluation of power concepts against requirements of the Strategic Defense Initiative.

  8. Small business innovation research: Program solicitation

    NASA Technical Reports Server (NTRS)

    1989-01-01

    This, the seventh annual SBIR solicitation by NASA, describes the program, identifies eligibility requirements, outlines the required proposal format and content, states proposal preparation and submission requirements, describes the proposal evaluation and award selection process, and provides other information to assist those interested in participating in NASA's SBIR program. It also identifies the Technical Topics and Subtopics in which SBIR Phase 1 proposals are solicited in 1989. These Topics and Subtopics cover a broad range of current NASA interests, but do not necessarily include all areas in which NASA plans or currently conducts research. High-risk high pay-off innovations are desired.

  9. Four-phase or two-phase signal plan? A study on four-leg intersection by cellular automaton simulations

    NASA Astrophysics Data System (ADS)

    Jin, Cheng-Jie; Wang, Wei; Jiang, Rui

    2016-08-01

    The proper setting of traffic signals at signalized intersections is one of the most important tasks in traffic control and management. This paper has evaluated the four-phase traffic signal plans at a four-leg intersection via cellular automaton simulations. Each leg consists of three lanes, an exclusive left-turn lane, a through lane, and a through/right-turn lane. For a comparison, we also evaluate the two-phase signal plan. The diagram of the intersection states in the space of inflow rate versus turning ratio has been presented, which exhibits four regions: In region I/II/III, congestion will propagate upstream and laterally and result in queue spillover with both signal plans/two-phase signal plan/four-phase signal plan, respectively. Therefore, neither signal plan works in region I, and only the four-phase signal plan/two-phase signal plan works in region II/III. In region IV, both signal plans work, but two-phase signal plan performs better in terms of average delays of vehicles. Finally, we study the diagram of the intersection states and average delays in the asymmetrical configurations.

  10. Life sciences payload definition and integration study, task C and D. Volume 2: Payload definition, integration, and planning studies

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The Life Sciences Payload Definition and Integration Study was composed of four major tasks. Tasks A and B, the laboratory definition phase, were the subject of prior NASA study. The laboratory definition phase included the establishment of research functions, equipment definitions, and conceptual baseline laboratory designs. These baseline laboratories were designated as Maxi-Nom, Mini-30, and Mini-7. The outputs of Tasks A and B were used by the NASA Life Sciences Payload Integration Team to establish guidelines for Tasks C and D, the laboratory integration phase of the study. A brief review of Tasks A and B is presented provide background continuity. The tasks C and D effort is the subject of this report. The Task C effort stressed the integration of the NASA selected laboratory designs with the shuttle sortie module. The Task D effort updated and developed costs that could be used by NASA for preliminary program planning.

  11. Family health nurse project--an education program of the World Health Organization: the University of Stirling experience.

    PubMed

    Murray, Ian

    2008-11-01

    This article outlines the delivery of the Family Health Nurse Education Programme of the World Health Organization (WHO) at the University of Stirling, Scotland, from 2001 to 2005. The program was part of the WHO European Family Health Nurse pilot project. The curriculum outlined by the WHO Curriculum Planning Group detailed the broad thrust of the Family Health Nurse Education Programme and was modified to be responsive to the context in which it was delivered, while staying faithful to general principles and precepts. The Family Health Nurse Education Programme is described in its evolving format over the two phases of the project; the remote and rural context occurred from 2001 to 2003, and the modification of the program for the urban phase of the project occurred during 2004 and 2005. The conceptual framework that was foundational to the development of the curriculum to prepare family health nurses will be described.

  12. Advanced Turbine Systems annual program review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Koop, W.E.

    1995-10-01

    Integrated High Performance Turbine Engine Technology (IHPTET) is a joint Air Force, Navy, Army, NASA, ARPA, and industry program focused on developing turbine engine technologies, with the goal of doubling propulsion capability by around the turn-of-the-century, and thus providing smaller, lighter, more durable, more affordable turbine engines in the future. IHPTET`s technology development plan for increasing propulsion capability with respect to time is divided into three phases. This phased approach reduces the technological risk of taking one giant leap, and also reduces the {open_quotes}political{close_quotes} risk of not delivering a product for an extended period of time, in that the phasingmore » allows continuous transfer of IHPTET technologies to our warfighters and continuous transfer to the commercial sector (dual-use). The IHPTET program addresses the three major classes of engines: turbofan/turbojet, turboshaft/turboprop, and expendables.« less

  13. $17 billion needed by year 2000.

    PubMed

    Finger, W R

    1995-09-01

    The United Nations Population Fund (UNFPA) estimates that US$17 billion will be needed to fund reproductive health care in developing countries by the year 2000. About US$10 billion of would go for family planning: currently, the amount spent on family planning is about US$5 billion. Donors are focusing on fewer countries because of limited resources. The United States Agency for International Development (USAID) is planning to phase out support for family planning in Jamaica and Brazil because the programs there have advanced sufficiently. Resources will be shifted to countries with more pressing needs. Dr. Richard Osborn, senior technical officer for UNFPA, states that UNFPA works with national program managers in allocating resources at the macro level (commodities, training). Currently, two-thirds of family planning funds spent worldwide come from developing country governments (mainly China, India, Indonesia, Mexico, South Africa, Turkey, and Bangladesh). Sustaining programs, much less adding new services, will be difficult. User fees and public-private partnerships are being considered; worldwide, consumers provide, currently, about 14% of family planning funds (The portion is higher in most Latin American countries.). In a few countries, insurance, social security, and other public-private arrangements contribute. Social marketing programs are being considered that would remove constraints on prescriptions and prices and improve the quality of services so that clients would be more willing to pay for contraceptives. Although governments are attempting to fit family planning into their health care budgets, estimates at the national level are difficult to make. Standards are needed to make expenditure estimates quickly and at low cost, according to Dr. Barbara Janowitz of FHI, which is developing guidelines. Studies in Bangladesh, Ecuador, Ghana, Mexico, and the Philippines are being conducted, with the assistance of The Evaluation Project at the Population Center at the University of North Carolina and in-country organizations, to determine the amounts from government resources spent on family planning services in general and by function (training, administration, service delivery, and information).

  14. Radio-science performance analysis software

    NASA Astrophysics Data System (ADS)

    Morabito, D. D.; Asmar, S. W.

    1995-02-01

    The Radio Science Systems Group (RSSG) provides various support functions for several flight project radio-science teams. Among these support functions are uplink and sequence planning, real-time operations monitoring and support, data validation, archiving and distribution functions, and data processing and analysis. This article describes the support functions that encompass radio-science data performance analysis. The primary tool used by the RSSG to fulfill this support function is the STBLTY program set. STBLTY is used to reconstruct observable frequencies and calculate model frequencies, frequency residuals, frequency stability in terms of Allan deviation, reconstructed phase, frequency and phase power spectral density, and frequency drift rates. In the case of one-way data, using an ultrastable oscillator (USO) as a frequency reference, the program set computes the spacecraft transmitted frequency and maintains a database containing the in-flight history of the USO measurements. The program set also produces graphical displays. Some examples and discussions on operating the program set on Galileo and Ulysses data will be presented.

  15. Radio-Science Performance Analysis Software

    NASA Astrophysics Data System (ADS)

    Morabito, D. D.; Asmar, S. W.

    1994-10-01

    The Radio Science Systems Group (RSSG) provides various support functions for several flight project radio-science teams. Among these support functions are uplink and sequence planning, real-time operations monitoring and support, data validation, archiving and distribution functions, and data processing and analysis. This article describes the support functions that encompass radio science data performance analysis. The primary tool used by the RSSG to fulfill this support function is the STBLTY program set. STBLTY is used to reconstruct observable frequencies and calculate model frequencies, frequency residuals, frequency stability in terms of Allan deviation, reconstructed phase, frequency and phase power spectral density, and frequency drift rates. In the case of one-way data, using an ultrastable oscillator (USO) as a frequency reference, the program set computes the spacecraft transmitted frequency and maintains a database containing the in-flight history of the USO measurements. The program set also produces graphical displays. Some examples and discussion on operating the program set on Galileo and Ulysses data will be presented.

  16. Radio-science performance analysis software

    NASA Technical Reports Server (NTRS)

    Morabito, D. D.; Asmar, S. W.

    1995-01-01

    The Radio Science Systems Group (RSSG) provides various support functions for several flight project radio-science teams. Among these support functions are uplink and sequence planning, real-time operations monitoring and support, data validation, archiving and distribution functions, and data processing and analysis. This article describes the support functions that encompass radio-science data performance analysis. The primary tool used by the RSSG to fulfill this support function is the STBLTY program set. STBLTY is used to reconstruct observable frequencies and calculate model frequencies, frequency residuals, frequency stability in terms of Allan deviation, reconstructed phase, frequency and phase power spectral density, and frequency drift rates. In the case of one-way data, using an ultrastable oscillator (USO) as a frequency reference, the program set computes the spacecraft transmitted frequency and maintains a database containing the in-flight history of the USO measurements. The program set also produces graphical displays. Some examples and discussions on operating the program set on Galileo and Ulysses data will be presented.

  17. WFIRST: Project Overview and Status

    NASA Astrophysics Data System (ADS)

    Kruk, Jeffrey; WFIRST Formulation Science Working Group, WFIRST Project Team

    2018-01-01

    The Wide-Field InfraRed Survey Telescope (WFIRST) will be the next Astrophysics flagship mission to follow JWST. The observatory payload consists of a Hubble-size telescope aperture with a wide-field NIR instrument and a coronagraph operating at visible wavelengths and employing state-of-the-art wavefront sensing and control. The Wide-field instrument is optimized for large area NIR imaging and spectroscopic surveys, with performance requirements driven by programs to study cosmology and exoplanet detection via gravitational microlensing. All data will be public immediately, and a substantial guest observer program will be supported.The WFIRST Project is presently in Phase A, with a transition to Phase B expected in early to mid 2018. Candidate observing programs are under detailed study in order to inform the mission design, but the actual science investigations will not be selected until much closer to launch. We will present an overview of the present mission design and expected performance, a summary of Project status, and plans for selecting the observing programs.

  18. Lessons Learned for Planning and Estimating Operations Support Requirements

    NASA Technical Reports Server (NTRS)

    Newhouse, Marilyn

    2011-01-01

    Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

  19. A Comprehensive Onboarding and Orientation Plan for Neurocritical Care Advanced Practice Providers.

    PubMed

    Langley, Tamra M; Dority, Jeremy; Fraser, Justin F; Hatton, Kevin W

    2018-06-01

    As the role of advanced practice providers (APPs) expands to include increasingly complex patient care within the intensive care unit, the educational needs of these providers must also be expanded. An onboarding process was designed for APPs in the neurocritical care service line. Onboarding for new APPs revolved around 5 specific areas: candidate selection, proctor assignment, 3-phased orientation process, remediation, and mentorship. To ensure effective training for APPs, using the most time-conscious approach, the backbone of the process is a structured curriculum. This was developed and integrated within the standard orientation and onboarding process. The curriculum design incorporated measurable learning goals, objective assessments of phased goal achievements, and opportunities for remediation. The neurocritical care service implemented an onboarding process in 2014. Four APPs (3 nurse practitioners and 1 physician assistant) were employed by the department before the implementation of the orientation program. The length of employment ranged from 1 to 4 years. Lack of clinical knowledge and/or sufficient training was cited as reasons for departure from the position in 2 of the 4 APPs, as either self-expression or peer evaluation. Since implementation of this program, 12 APPs have completed the program, of which 10 remain within the division, creating an 83% retention rate. The onboarding process, including a 3-phased, structured orientation plan for neurocritical care, has increased APP retention since its implementation. The educational model, along with proctoring and mentorship, has improved clinical knowledge and increased nurse practitioner retention. A larger-scale study would help to support the validity of this onboarding process.

  20. Building a patient-centered and interprofessional training program with patients, students and care professionals: study protocol of a participatory design and evaluation study.

    PubMed

    Vijn, Thomas W; Wollersheim, Hub; Faber, Marjan J; Fluit, Cornelia R M G; Kremer, Jan A M

    2018-05-30

    A common approach to enhance patient-centered care is training care professionals. Additional training of patients has been shown to significantly improve patient-centeredness of care. In this participatory design and evaluation study, patient education and medical education will be combined by co-creating a patient-centered and interprofessional training program, wherein patients, students and care professionals learn together to improve patient-centeredness of care. In the design phase, scientific literature regarding interventions and effects of student-run patient education will be synthesized in a scoping review. In addition, focus group studies will be performed on the preferences of patients, students, care professionals and education professionals regarding the structure and content of the training program. Subsequently, an intervention plan of the training program will be constructed by combining these building blocks. In the evaluation phase, patients with a chronic disease, that is rheumatoid arthritis, diabetes and hypertension, and patients with an oncologic condition, that is colonic cancer and breast cancer, will learn together with medical students, nursing students and care professionals in training program cycles of three months. Process and effect evaluation will be performed using the plan-do-study-act (PDSA) method to evaluate and optimize the training program in care practice and medical education. A modified control design will be used in PDSA-cycles to ensure that students who act as control will also benefit from participating in the program. Our participatory design and evaluation study provides an innovative approach in designing and evaluating an intervention by involving participants in all stages of the design and evaluation process. The approach is expected to enhance the effectiveness of the training program by assessing and meeting participants' needs and preferences. Moreover, by using fast PDSA cycles and a modified control design in evaluating the training program, the training program is expected to be efficiently and rapidly implemented into and adjusted to care practice and medical education.

  1. Energy Problems: Public Beliefs, Attitudes and Behaviors.

    ERIC Educational Resources Information Center

    Thompson, Phyllis T.; MacTavish, John

    This survey reported one phase of a larger project. The goals of the project are to plan and conduct a public education program on energy-related concerns that will produce an informed public, willing to support and cooperate with the strategies necessary for the long-term resolution of our energy problems. Reported in this document are the…

  2. Putting a Medical Library Online: Phase III--Remote Access to CD-ROMs.

    ERIC Educational Resources Information Center

    Kittle, Paul

    1989-01-01

    Describes the implementation of a project that provides dial-up access to MEDLINE on remote optical data disk (CD-ROM) using software that enables callers to use programs like Wordstar, Lotus, and dBase. Highlights include networking CD-ROM databases, hardware considerations, advantages and disadvantages of remote access, and future plans. A…

  3. Large Deployable Reflector (LDR) system concept and technology definition study. Volume 2: Technology assessment and technology development plan

    NASA Technical Reports Server (NTRS)

    Agnew, Donald L.; Jones, Peter A.

    1989-01-01

    A study was conducted to define reasonable and representative LDR system concepts for the purpose of defining a technology development program aimed at providing the requisite technological capability necessary to start LDR development by the end of 1991. This volume presents thirteen technology assessments and technology development plans, as well as an overview and summary of the LDR concepts. Twenty-two proposed augmentation projects are described (selected from more than 30 candidates). The five LDR technology areas most in need of supplementary support are: cryogenic cooling; astronaut assembly of the optically precise LDR in space; active segmented primary mirror; dynamic structural control; and primary mirror contamination control. Three broad, time-phased, five-year programs were synthesized from the 22 projects, scheduled, and funding requirements estimated.

  4. Satellite Power Systems (SPS) concept definition study, exhibit C. Volume 2, part 2: System engineering, cost and programmatics

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1979-01-01

    Volume 2, Part 2, of a seven volume Satellite Power Systems (SPS) report is presented. Part 2 covers cost and programmatics and is divided into four sections. The first section gives illustrations of the SPS reference satellite and rectenna concept, and an overall scenario for SPS space transportation involvement. The second section presents SPS program plans for the implementation of PHASE C/D activities. These plans describe SPS program schedules and networks, critical items of systems evolution/technology development, and the natural resources analysis. The fourth section presents summary comments on the methods and rationale followed in arriving at the results documented. Suggestions are also provided in those areas where further analysis or evaluation will enhance SPS cost and programmatic definitions.

  5. SU-E-T-436: Accelerated Gated IMRT: A Feasibility Study for Lung Cancer Patients

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gilles, M; Boussion, N; Visvikis, D

    Purpose: To evaluate the feasibility of delivering a gated Intensity Modulated Radiotherapy (IMRT) treatment using multiple respiratory phases in order to account for all anatomic changes during free breathing and accelerate the gated treatment without increasing the dose per fraction. Methods: For 7 patients with lung cancer, IMRT treatment plans were generated on a full inspiration (FI) Computed Tomography (CT) and a Mid Intensity Position (MIP) CT. Moreover, in order to achieve an accelerated gated IMRT, multiple respiratory phase plans were calculated: 2-phase plans including the FI and the full expiration phases, and 3-phase plans by adding the mid-inspiration phase.more » In order to assess the tolerance limits, plans' doses were registered and summed to the FI-based plan. Mean dose received by Organs at Risk (OARs) and target volumes were used to compare obtained plans. Results: The mean dose differences between the FI plans and the multi-phase plans never exceeded 0.4 Gy (Fig. 1). Concerning the clinical target volume these differences were even smaller: less than 0.1 Gy for both the 2-phase and 3-phase plans. Regarding the MIP treatment plan, higher doses in different healthy structures were observed, with a relative mean increase of 0.4 to 1.5 Gy. Finally, compared to the prescribed dose, the FI as well as the multi-phase plans were associated with a mean difference of 0.4 Gy, whereas in the case of MIP a higher mean difference of 0.6 Gy was observed. Conclusion: The doses obtained while planning a multi-phase gated IMRT treatment were within the tolerance limits. Compared to MIP, a better healthy tissue sparing was observed in the case of treatment planning based on one or multiple phases. Future work will consist in testing the multi-phase treatment delivery while accounting for the multileaf collimator speed constraints.« less

  6. SU-G-TeP1-06: Fast GPU Framework for Four-Dimensional Monte Carlo in Adaptive Intensity Modulated Proton Therapy (IMPT) for Mobile Tumors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Botas, P; Heidelberg University, Heidelberg; Grassberger, C

    Purpose: To demonstrate the feasibility of fast Monte Carlo (MC) treatment planning and verification using four-dimensional CT (4DCT) for adaptive IMPT for lung cancer patients. Methods: A validated GPU MC code, gPMC, has been linked to the patient database at our institution and employed to compute the dose-influence matrices (Dij) on the planning CT (pCT). The pCT is an average of the respiratory motion of the patient. The Dijs and patient structures were fed to the optimizer to calculate a treatment plan. To validate the plan against motion, a 4D dose distribution averaged over the possible starting phases is calculatedmore » using the 4DCT and a model of the time structure of the delivered spot map. The dose is accumulated using vector maps created by a GPU-accelerated deformable image registration program (DIR) from each phase of the 4DCT to the reference phase using the B-spline method. Calculation of the Dij matrices and the DIR are performed on a cluster, with each field and vector map calculated in parallel. Results: The Dij production takes ∼3.5s per beamlet for 10e6 protons, depending on the energy and the CT size. Generating a plan with 4D simulation of 1000 spots in 4 fields takes approximately 1h. To test the framework, IMPT plans for 10 lung cancer patients were generated for validation. Differences between the planned and the delivered dose of 19% in dose to some organs at risk and 1.4/21.1% in target mean dose/homogeneity with respect to the plan were observed, suggesting potential for improvement if adaptation is considered. Conclusion: A fast MC treatment planning framework has been developed that allows reliable plan design and verification for mobile targets and adaptation of treatment plans. This will significantly impact treatments for lung tumors, as 4D-MC dose calculations can now become part of planning strategies.« less

  7. Sound Medication Therapy Management Programs, Version 2.0 with validation study.

    PubMed

    2008-01-01

    The Academy of Managed Care Pharmacy (AMCP, the Academy) contracted with the National Committee for Quality Assurance (NCQA) to conduct a field study to validate and assess the 2006 Sound Medication Therapy Management Programs, Version 1.0 document. Version 1.0 posits several principles of sound medication therapy management (MTM) programs: they (1) recruit patients whose data show they may need assistance with managing medications; (2) have health professionals who intervene with patients and their physicians to improve medication regimens; and (3) measure their results. The validation study determined the extent to which the principles identified in version 1.0 are incorporated in MTM programs. The method was designed to determine to what extent the important features and operational elements of sound MTM programs as described in version 1.0 are (1) acceptable and seen as comprehensive to users, (2) incorporated into MTM programs in the field, (3) reflective of the consensus group's intentions, and (4) in need of modification or updating. NCQA first conducted Phase One, in which NCQA gathered perspectives on the principles in the consensus document from a mixed group of stakeholders representing both providers and users of MTM programs. Phase Two involved a deeper analysis of existing programs related to the consensus document, in which NCQA conducted a Web-based survey of 20 varied MTM programs and conducted in-depth site visits with 5 programs. NCQA selected programs offered by a range of MTM-providing organizations -- health plans, pharmacy benefit management companies, disease management organizations, and stand-alone MTM providers. NCQA analyzed the results of both phases. The Phase Two survey asked specific questions of the programs and found that some programs perform beyond the principles listed in version 1.0. NCQA found that none of the elements of the consensus document should be eliminated because programs cannot perform them, although NCQA suggested some areas where the document could be more expansive or more specific, given the state of MTM operations in the field. The important features and operational elements in the document were categorized into the following 3 overall categories, which NCQA used to structure the survey and conduct the site visits in Phase Two: (1) eligibility and enrollment, (2) operations, and (3) quality management. NCQA found that the original consensus document was realistic in identifying the elements of sound MTM. In the current project, NCQA's purpose was not to make judgments about the effectiveness of MTM programs in general or any individual program in particular. NCQA recommended that the consensus document could be made stronger and more specific in 3 areas: (1) specifically state that the Patient Identification and Recruitment section advocates use of various eligibility criteria that may include, but are not limited to, Medicare-defined MTM eligibility criteria; (2) reframe or remove the statement in Appendix A of the consensus document that the preferred modality for MTM is face-to-face interaction between patient and pharmacist, unless there are comparative data to support it as currently written; and (3) specifically recommend that programs measure performance across the entire populations in their plans in addition to measuring results for those patients selected into MTM. This will make benchmarking among programs possible and will lead to substantiated best practices in this growing field.

  8. [In search of results of technical cooperation].

    PubMed

    Jourdan Hidalgo, L; Manuel Sotelo, J

    1999-06-01

    For the Pan American Health Organization (PAHO), technical cooperation (TC) is the process by which the PAHO Member States work with the Organization, as equal partners, to identify and reach their own health goals and to promote self-sufficiency in health development, through programs that respond to those countries' needs and national priorities. Since 1978, PAHO has used the American Regional Planning, Programming, Monitoring, and Evaluation System (AMPES) to establish management procedures and to facilitate decision-making in health TC. As part of AMPES, PAHO uses a "logical approach to project management" to structure the work program of the Organization and to identify the expected results from TC activities and TC resource investments. This project management approach, which replaces the "functional approaches" system used to date, also helps establish a causative relationship between the programmed activities and the results that PAHO expects, and between the activities and the hoped-for outcomes in the countries. As part of an ongoing process of rethinking international health TC, several years ago PAHO began a four-phase study on the usefulness and validity of functional approaches and on the need to propose new ones or to modify existing ones. The results of the initial phase showed it was difficult to classify the activities because the functional-approaches categories were not mutually exclusive and the TC activities were complex. Further, the expected results did not specify the product for which the PAHO Secretariat was accountable within a certain time frame nor the Secretariat's level of responsibility. Thus, a new and more flexible classification of expected results was proposed, with the following categories: cooperation networks and alliances; surveillance and information systems; standards and guidelines; research and evaluation studies; plans, projects, and policies; methods, models, and technologies; training programs; promotional campaigns and advocacy; and direct support. In the second phase of the study, it was concluded that the proposed classification system made it possible to more precisely identify the products of PAHO technical cooperation projects, the Organization's degree of responsibility, and the bases for estimating needed resources. The new system could also facilitate monitoring and evaluation. In addition, the third phase of analyzing the functional approaches has begun. Its objective is to evaluate the effect of technical cooperation based on the changes incorporated in the programming of activities.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beaudry, J.; Bergman, A.; British Columbia Cancer Agency - Vancouver Centre, Vancouver, BC

    Lung tumours move due to respiratory motion. This is managed during planning by acquiring a 4DCT and capturing the excursion of the GTV (gross tumour volume) throughout the breathing cycle within an IGTV (Internal Gross Tumour Volume) contour. Patients undergo a verification cone-beam CT (CBCT) scan immediately prior to treatment. 3D reconstructed images do not consider tumour motion, resulting in image artefacts, such as blurring. This may lead to difficulty in identifying the tumour on reconstructed images. It would be valuable to create a 4DCBCT reconstruction of the tumour motion to confirm that does indeed remain within the planned IGTV.more » CBCT projections of a Quasar Respiratory Motion Phantom are acquired in Treatment mode (half-fan scan) on a Varian TrueBeam accelerator. This phantom contains a mobile, low-density lung insert with an embedded 3cm diameter tumour object. It is programmed to create a 15s periodic, 2cm (sup/inf) displacement. A Varian Real-time Position Management (RPM) tracking-box is placed on the phantom breathing platform. Breathing phase information is automatically integrated into the projection image files. Using in-house Matlab programs and RTK (Reconstruction Tool Kit) open-source toolboxes, the projections are re-binned into 10 phases and a 4DCBCT scan reconstructed. The planning IGTV is registered to the 4DCBCT and the tumour excursion is verified to remain within the planned contour. This technique successfully reconstructs 4DCBCT images using clinical modes for a breathing phantom. UBC-BCCA ethics approval has been obtained to perform 4DCBCT reconstructions on lung patients (REB#H12-00192). Clinical images will be accrued starting April 2014.« less

  10. Leadership and management curriculum planning for Iranian general practitioners.

    PubMed

    Khosravan, Shahla; Karimi Moonaghi, Hossein; Yazdani, Shahram; Ahmadi, Soleiman; Mansoorian, Mohammad Reza

    2015-10-01

    Leadership and management are two expected features and competencies for general practitioners (GPs). The purpose of this study was leadership and management curriculum planning for GPs which was performed based on Kern's curriculum planning cycle. This study was conducted in 2011- 2012 in Iran using an explanatory mixed-methods approach. It was conducted through an initial qualitative phase using two focus group discussions and 28 semi-structured interviews with key informants to capture their experiences and viewpoints about the necessity of management courses for undergraduate medical students, goals, objectives, and educational strategies according to Kern's curriculum planning cycle. The data was used to develop a questionnaire to be used in a quantitative written survey. Results of these two phases and that of the review of medical curriculum in other countries and management curriculum of other medical disciplines in Iran were used in management and leadership curriculum planning. In the qualitative phase, purposeful sampling and content analysis with constant comparison based on Strauss and Corbin's method were used; descriptive and analytic tests were used for quantitative data by SPSS version 14. In the qualitatively stage of  this research, 6 main categories including the necessity of management course, features and objectives of management curriculum, proper educational setting, educational methods and strategies, evolutionary method and feedback result were determined. In the quantitatively stage of the research, from the viewpoints of 51.6% of 126 units of research who filled out the questionnaire, ranked high necessary of management courses. The coordination of care and clinical leadership was determined as the most important role for GPs with a mean of 6.2 from sample viewpoint. Also, team working and group dynamics had the first priority related to the principles and basics of management with a mean of 3.59. Other results were shown in the paper. Results of this study indicated the need to provide educational programs for GPs; it led to a systematic curriculum theory and clinical management using Kern cycle for general practitioner's discipline. Implementation and evaluation of this program is recommended.

  11. Clinical implementation of target tracking by breathing synchronized delivery

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tewatia, Dinesh; Zhang Tiezhi; Tome, Wolfgang

    2006-11-15

    Target-tracking techniques can be categorized based on the mechanism of the feedback loop. In real time tracking, breathing-delivery phase correlation is provided to the treatment delivery hardware. Clinical implementation of target tracking in real time requires major hardware modifications. In breathing synchronized delivery (BSD), the patient is guided to breathe in accordance with target motion derived from four-dimensional computed tomography (4D-CT). Violations of mechanical limitations of hardware are to be avoided at the treatment planning stage. Hardware modifications are not required. In this article, using sliding window IMRT delivery as an example, we have described step-by-step the implementation of targetmore » tracking by the BSD technique: (1) A breathing guide is developed from patient's normal breathing pattern. The patient tries to reproduce this guiding cycle by following the display in the goggles; (2) 4D-CT scans are acquired at all the phases of the breathing cycle; (3) The average tumor trajectory is obtained by deformable image registration of 4D-CT datasets and is smoothed by Fourier filtering; (4) Conventional IMRT planning is performed using the images at reference phase (full exhalation phase) and a leaf sequence based on optimized fluence map is generated; (5) Assuming the patient breathes with a reproducible breathing pattern and the machine maintains a constant dose rate, the treatment process is correlated with the breathing phase; (6) The instantaneous average tumor displacement is overlaid on the dMLC position at corresponding phase; and (7) DMLC leaf speed and acceleration are evaluated to ensure treatment delivery. A custom-built mobile phantom driven by a computer-controlled stepper motor was used in the dosimetry verification. A stepper motor was programmed such that the phantom moved according to the linear component of tumor motion used in BSD treatment planning. A conventional plan was delivered on the phantom with and without motion. The BSD plan was also delivered on the phantom that moved with the prescheduled pattern and synchronized with the delivery of each beam. Film dosimetry showed underdose and overdose in the superior and inferior regions of the target, respectively, if the tumor motion is not compensated during the delivery. BSD delivery resulted in a dose distribution very similar to the planned treatments.« less

  12. Cassini Tour Atlas Automated Generation

    NASA Technical Reports Server (NTRS)

    Grazier, Kevin R.; Roumeliotis, Chris; Lange, Robert D.

    2011-01-01

    During the Cassini spacecraft s cruise phase and nominal mission, the Cassini Science Planning Team developed and maintained an online database of geometric and timing information called the Cassini Tour Atlas. The Tour Atlas consisted of several hundreds of megabytes of EVENTS mission planning software outputs, tables, plots, and images used by mission scientists for observation planning. Each time the nominal mission trajectory was altered or tweaked, a new Tour Atlas had to be regenerated manually. In the early phases of Cassini s Equinox Mission planning, an a priori estimate suggested that mission tour designers would develop approximately 30 candidate tours within a short period of time. So that Cassini scientists could properly analyze the science opportunities in each candidate tour quickly and thoroughly so that the optimal series of orbits for science return could be selected, a separate Tour Atlas was required for each trajectory. The task of manually generating the number of trajectory analyses in the allotted time would have been impossible, so the entire task was automated using code written in five different programming languages. This software automates the generation of the Cassini Tour Atlas database. It performs with one UNIX command what previously took a day or two of human labor.

  13. NASA Flight Planning Branch Space Shuttle Lessons Learned

    NASA Technical Reports Server (NTRS)

    Clevenger, Jennifer D.; Bristol, Douglas J.; Whitney, Gregory R.; Blanton, Mark R.; Reynolds, F. Fisher, III

    2011-01-01

    Planning products and procedures that allowed the mission Flight Control Teams and the Astronaut crews to plan, train and fly every Space Shuttle mission were developed by the Flight Planning Branch at the NASA Johnson Space Center in Houston, Texas. As the Space Shuttle Program came to a close, lessons learned were collected from each phase of the successful execution of these Space Shuttle missions. Specific examples of how roles and responsibilities of console positions that develop the crew and vehicle attitude timelines have been analyzed and will be discussed. Additionally, the relationships and procedural hurdles experienced through international collaboration have molded operations. These facets will be explored and related to current and future operations with the International Space Station and future vehicles. Along with these important aspects, the evolution of technology and continual improvement of data transfer tools between the Space Shuttle and ground team has also defined specific lessons used in improving the control team s effectiveness. Methodologies to communicate and transmit messages, images, and files from the Mission Control Center to the Orbiter evolved over several years. These lessons were vital in shaping the effectiveness of safe and successful mission planning and have been applied to current mission planning work in addition to being incorporated into future space flight planning. The critical lessons from all aspects of previous plan, train, and fly phases of Space Shuttle flight missions are not only documented in this paper, but are also discussed regarding how they pertain to changes in process and consideration for future space flight planning.

  14. Flight Planning Branch Space Shuttle Lessons Learned

    NASA Technical Reports Server (NTRS)

    Price, Jennifer B.; Scott, Tracy A.; Hyde, Crystal M.

    2011-01-01

    Planning products and procedures that allow the mission flight control teams and the astronaut crews to plan, train and fly every Space Shuttle mission have been developed by the Flight Planning Branch at the NASA Johnson Space Center. As the Space Shuttle Program ends, lessons learned have been collected from each phase of the successful execution of these Shuttle missions. Specific examples of how roles and responsibilities of console positions that develop the crew and vehicle attitude timelines will be discussed, as well as techniques and methods used to solve complex spacecraft and instrument orientation problems. Additionally, the relationships and procedural hurdles experienced through international collaboration have molded operations. These facets will be explored and related to current and future operations with the International Space Station and future vehicles. Along with these important aspects, the evolution of technology and continual improvement of data transfer tools between the shuttle and ground team has also defined specific lessons used in the improving the control teams effectiveness. Methodologies to communicate and transmit messages, images, and files from Mission Control to the Orbiter evolved over several years. These lessons have been vital in shaping the effectiveness of safe and successful mission planning that have been applied to current mission planning work in addition to being incorporated into future space flight planning. The critical lessons from all aspects of previous plan, train, and fly phases of shuttle flight missions are not only documented in this paper, but are also discussed as how they pertain to changes in process and consideration for future space flight planning.

  15. The European launch vehicle Ariane: Its commercial status - Its evolution

    NASA Astrophysics Data System (ADS)

    Glavany, M.

    The status of the Ariane program is summarized. The shareholders and participating countries in the French private firm Arianespace are listed and the Ariane rocket is very briefly described, depicting the planned models and showing their anticipated performances and the types of fairing available to them, and comparing the available volume in Ariane 3 and 4 and foreign competitors. The current status of the Ariane program, including the development phase, promotional series, and commercial phase are briefly presented. The Guiana space center and second launch pad are described and the advantages of Arianespace's launch service and the vehicle are listed, along with Ariane's advantages over the Space Shuttle. The expected market share for Ariane is shown in comparison with that of the Shuttle and other nations.

  16. A study of topics for distance education-A survey of U.S. Fish and Wildlife Service employees

    USGS Publications Warehouse

    Ratz, Joan M.; Schuster, Rudy M.; Marcy, Ann H.

    2011-01-01

    The purpose of this study was to identify training topics and distance education technologies preferred by U.S. Fish and Wildlife Service employees. This study was conducted on behalf of the National Conservation Training Center to support their distance education strategy planning and implementation. When selecting survey recipients, we focused on employees in positions involving conservation and environmental education and outreach programming. We conducted the study in two phases. First, we surveyed 72 employees to identify useful training topics. The response rate was 61 percent; respondents were from all regions and included supervisors and nonsupervisors. Five topics for training were identified: creating and maintaining partnerships (partnerships), technology, program planning and development (program planning), outreach methods to engage the community (outreach methods), and evaluation methods. In the second phase, we surveyed 1,488 employees to assess preferences for training among the five topics identified in the first survey and preferences among six distance education technologies: satellite television, video conferencing, audio conferencing, computer mediated training, written resources, and audio resources. Two types of instructor-led training were included on the survey to compare to the technology options. Respondents were asked what types of information, such as basic facts or problem solving skills, were needed for each of the five topics. The adjusted response rate was 64 percent; respondents were from all regions and included supervisors and nonsupervisors. The results indicated clear preferences among respondents for certain training topics and technologies. All five training topics were valued, but the topics of partnerships and technology were given equal value and were valued more than the other three topics. Respondents indicated a desire for training on the topics of partnerships, technology, program planning, and outreach methods. For the six distance education technologies, respondents indicated different levels of usability and access. Audio conferencing and written resources were reported to be most usable and accessible. The ratings of technology usability/access differed according to region; respondents in region 9 rated most technologies higher on usability/access. Respondents indicated they would take courses through either onsite or distance education approaches, but they prefer onsite training for most topics and most types of information.

  17. IMMR Phase 1 Prototyping Plan Inputs

    NASA Technical Reports Server (NTRS)

    Vowell, C. W.; Johnson-Throop, Kathy; Smith, Bryon; Darcy, Jeannette

    2006-01-01

    This viewgraph presentation reviews the phase I plan of the prototype of the IMMR by the Multilateral Medical Operations Panel (MMOP) Medical Informatics & Technology (MIT) Working Group. It reviews the Purpose of IMMR Prototype Phase 1 (IPP1); the IPP1 Plan Overview, the IMMR Prototype Phase 1 Plan for PDDs and MIC and MIC-DDs, Plan for MICs, a nd the IPP1 objectives

  18. Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of themore » program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment components such as the server hardware, the server operating system, the database, and the web server. This document describes the platform requirements, the architecture, and the implementation details of the CCOT-P engineering prototype.« less

  19. A pilot hospital-school educational program to address teen motor vehicle safety.

    PubMed

    Unni, Purnima; Morrow, Stephen E; Shultz, Barbara L; Tian, Tina T

    2013-10-01

    Texting while driving has emerged as a significant distracted driving behavior among teenage drivers. A unique hospital-school collaborative pilot intervention (called "Be in the Zone" or "BITZ") was implemented to combat this growing problem. This intervention was hypothesized to lead to a decline in texting while driving among high school students. This collaborative intervention consisted of two separate phases. In Phase 1, small groups of high school student leaders participated in a half-day interactive educational session in a pediatric hospital. Pre- and post-follow-up surveys were administered to this group. In Phase 2, these same students took the lessons they learned from the hospital to plan and implement a yearlong peer-to-peer campaign that focused on a clear "no texting while driving" message at their schools. Two unannounced driver observations were conducted to evaluate the effectiveness of the pilot program. Sixty-one high school students participated in Phase 1. Self-reported texting while driving rates decreased significantly among the participants after Phase 1. Two schools were recruited to participate in Phase 2. Unannounced driver observations were conducted before the campaign and toward the end of the campaign. Postintervention, there was a significant decrease in the percentage of drivers who texted while driving. Preliminary results from this pilot program suggest that a strategy of combining hospital-school partnerships with a peer-driven educational approach can be effective in reducing texting while driving among teenagers in the short-term.

  20. Dealing with large-scale supply lines when introducing new regimens.

    PubMed

    Malati, Christine; Rosenfeld, Joshua; Mowafy, Sherif; Rittmiller, Trevor; Kuritsky, Joel; Crowley, John

    2017-07-01

    As programs plan the introduction of a new antiretroviral as part of a regimen for HIV treatment, supply chain considerations need to be taken into account. The key to success is balancing the introduction of a new regimen with the phasing out of an old regimen in a manner that does not result in either a shortage or an excess supply of either product while ensuring that patients continue receiving their medications. This necessitates that country programs, donors, and procurement entities possess an appreciation of the global antiretroviral market and understand the dynamics that the manufacturing of new antiretrovirals will have on the transition. Supply, demand, and financial considerations affect the capacity of the supply chain to facilitate a successful antiretroviral transition. Although this commentary draws on United States Agency for International Development experiences under the President's Emergency Plan for AIDS Relief from earlier antiretroviral treatment shifts, the approaches are applicable to other institutions and to future transitions. Three approaches were employed: ensuring the engagement of all key stakeholders in transition planning and execution, including clinicians, advocacy groups, supply chain professionals, ministry, and donors; conducting and updating regularly the national quantification and supply plans for all regimens; and introducing antiretroviral products into programs from regional warehouses based on firm orders. Extensive planning and accounting for supply chain factors is essential to ensuring a smooth transition to a new regimen and to enable the global antiretroviral market to respond adequately.

  1. Quality Assurance Project Plan for the treatability study of in situ vitrification of Seepage Pit 1 in Waste Area Grouping 7 at Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Quality Assurance Project Plan (QAPjP) establishes the quality assurance procedures and requirements to be implemented for the control of quality-related activities for Phase 3 of the Treatability Study (TS) of In Situ Vitrification (ISV) of Seepage Pit 1, ORNL Waste Area Grouping 7. This QAPjP supplements the Quality Assurance Plan for Oak Ridge National Laboratory Environmental Restoration Program by providing information specific to the ISV-TS. Phase 3 of the TS involves the actual ISV melt operations and posttest monitoring of Pit 1 and vicinity. Previously, Phase 1 activities were completed, which involved determining the boundaries of Pit 1, usingmore » driven rods and pipes and mapping the distribution of radioactivity using logging tools within the pipes. Phase 2 involved sampling the contents, both liquid and solids, in and around seepage Pit 1 to determine their chemical and radionuclide composition and the spatial distribution of these attributes. A separate QAPjP was developed for each phase of the project. A readiness review of the Phase 3 activities presented QAPjP will be conducted prior to initiating field activities, and an Operational Acceptance, Test (OAT) will also be conducted with no contamination involved. After, the OAT is complete, the ISV process will be restarted, and the melt will be allowed to increase with depth and incorporate the radionuclide contamination at the bottom of Pit 1. Upon completion of melt 1, the equipment will be shut down and mobilized to an adjacent location at which melt 2 will commence.« less

  2. A Proposed Borehole Scientific Laboratory in Quay County, New Mexico, USA

    NASA Astrophysics Data System (ADS)

    Nielson, Dennis; Eckels, Marc; Mast, Peter; Zellman, Mark; Creed, Robert

    2017-04-01

    Our team has received funding from the US Department of Energy to initiate a Deep Borehole Field Test that will develop a subsurface test site to evaluate the drilling and scientific aspects of deep borehole disposal of nuclear waste in crystalline rock. Phase 1 of the project will focus on Public Outreach and land acquisition whereas Phase 2 will generate a drilling and testing plan and secure regulatory approvals. Phase 3 will complete the Drilling and Testing Plan and Phase 4 will include the drilling and testing. Phase 5 will be devoted to borehole science and experiments with emplacement technology. Although we are specifically considering issues associated with the disposal of waste, this project is a proof of concept, and no waste will be emplaced at our site. In brief, the concept envisions an 8-1/2 inch open-hole completion at a depth of 5000 m in crystalline rock. There will be an extensive program of sample collection (including core) and analysis as well as geophysical logging and borehole testing. Critical issues will be low permeability in the crystalline rock as well as the ability to manage borehole quality. Our team has proposed a site in Quay County, New Mexico that has an 850 meter thick Paleozoic section overlying homogeneous Precambrian granite. A subsequent phase of the project may drill a second hole with a 17-1/2 inch completion located about 200 m from the first. Our long-term plan is that this site will be managed as a deep scientific observatory that also provides a facility for scientific experiments and testing of borehole infrastructure and drilling equipment.

  3. Communication Enhancement Project. Manitoba Pool Elevators and United Grain Growers. Phase One Final Report.

    ERIC Educational Resources Information Center

    Howell, Sandi

    In 1992, United Grain Growers (UGG) and Manitoba Pool (MP) formed a partnership to examine the literacy and numeracy needs of their rural grain elevator operators and the potential of delivering a communications enhancement program in the rural areas. During part 1, the committee held a series of initial planning meetings. Both companies held…

  4. Analysis of nuclear waste disposal in space, phase 3. Volume 1: Executive summary of technical report

    NASA Technical Reports Server (NTRS)

    Rice, E. E.; Miller, N. E.; Yates, K. R.; Martin, W. E.; Friedlander, A. L.

    1980-01-01

    The objectives, approach, assumptions, and limitations of a study of nuclear waste disposal in space are discussed with emphasis on the following: (1) payload characterization; (2) safety assessment; (3) health effects assessment; (4) long-term risk assessment; and (5) program planning support to NASA and DOE. Conclusions are presented for each task.

  5. The Extreme Ultraviolet Explorer science instruments development - Lessons learned

    NASA Technical Reports Server (NTRS)

    Malina, Roger F.; Battel, S.

    1991-01-01

    The science instruments development project for the Extreme Ultraviolet Explorer (EUVE) satellite is reviewed. Issues discussed include the philosophical basis of the program, the establishment of a tight development team, the approach to planning and phasing activities, the handling of the most difficult technical problems, and the assessment of the work done during the preimplemntation period of the project.

  6. Technical approach to groundwater restoration. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) andmore » minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures.« less

  7. Satellite Power System (SPS) concept definition study (exhibit C)

    NASA Technical Reports Server (NTRS)

    Haley, G. M.

    1979-01-01

    The major outputs of the study are the constructability studies which resulted in the definition of the concepts for satellite, rectenna, and satellite construction base construction. Transportation analyses resulted in definition of heavy-lift launch vehicle, electric orbit transfer vehicle, personnel orbit transfer vehicle, and intra-orbit transfer vehicle as well as overall operations related to transportation systems. The experiment/verification program definition resulted in the definition of elements for the Ground-Based Experimental Research and Key Technology plans. These studies also resulted in conceptual approaches for early space technology verification. The cost analysis defined the overall program and cost data for all program elements and phases.

  8. Environmental, health, and safety issues of fuel cells in transportation. Volume 1: Phosphoric acid fuel-cell buses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ring, S

    1994-12-01

    The U.S. Department of Energy (DOE) chartered the Phosphoric Acid Fuel-Cell (PAFC) Bus Program to demonstrate the feasibility of fuel cells in heavy-duty transportation systems. As part of this program, PAFC- powered buses are being built to meet transit industry design and performance standards. Test-bed bus-1 (TBB-1) was designed in 1993 and integrated in March 1994. TBB-2 and TBB-3 are under construction and should be integrated in early 1995. In 1987 Phase I of the program began with the development and testing of two conceptual system designs- liquid- and air-cooled systems. The liquid-cooled PAFC system was chosen to continue, throughmore » a competitive award, into Phase H, beginning in 1991. Three hybrid buses, which combine fuel-cell and battery technologies, were designed during Phase III. After completing Phase II, DOE plans a comprehensive performance testing program (Phase HI) to verify that the buses meet stringent transit industry requirements. The Phase III study will evaluate the PAFC bus and compare it to a conventional diesel bus. This NREL study assesses the environmental, health, and safety (EH&S) issues that may affect the commercialization of the PAFC bus. Because safety is a critical factor for consumer acceptance of new transportation-based technologies the study focuses on these issues. The study examines health and safety together because they are integrally related. In addition, this report briefly discusses two environmental issues that are of concern to the Environmental Protection Agency (EPA). The first issue involves a surge battery used by the PAFC bus that contains hazardous constituents. The second issue concerns the regulated air emissions produced during operation of the PAFC bus.« less

  9. TITLE: Environmental, health, and safety issues offuel cells in transportation. Volume 1: Phosphoricacid fuel-cell buses

    NASA Astrophysics Data System (ADS)

    Ring, Shan

    1994-12-01

    The U.S. Department of Energy (DOE) chartered the Phosphoric Acid Fuel-Cell (PAFC) Bus Program to demonstrate the feasibility of fuel cells in heavy-duty transportation systems. As part of this program, PAFC- powered buses are being built to meet transit industry design and performance standards. Test-bed bus-1 (TBB-1) was designed in 1993 and integrated in March 1994. TBB-2 and TBB-3 are under construction and should be integrated in early 1995. In 1987 Phase 1 of the program began with the development and testing of two conceptual system designs- liquid- and air-cooled systems. The liquid-cooled PAFC system was chosen to continue, through a competitive award, into Phase H, beginning in 1991. Three hybrid buses, which combine fuel-cell and battery technologies, were designed during Phase 3. After completing Phase 2, DOE plans a comprehensive performance testing program (Phase H1) to verify that the buses meet stringent transit industry requirements. The Phase 3 study will evaluate the PAFC bus and compare it to a conventional diesel bus. This NREL study assesses the environmental, health, and safety (EH&S) issues that may affect the commercialization of the PAFC bus. Because safety is a critical factor for consumer acceptance of new transportation-based technologies the study focuses on these issues. The study examines health and safety together because they are integrally related. In addition, this report briefly discusses two environmental issues that are of concern to the Environmental Protection Agency (EPA). The first issue involves a surge battery used by the PAFC bus that contains hazardous constituents. The second issue concerns the regulated air emissions produced during operation of the PAFC bus.

  10. The Development and Validation of a Human Systems Integration (HSI) Program for the Canadian Department of National Defence (DND)

    DTIC Science & Technology

    2008-09-01

    inputs to interface and workspace design , and iterative user testing is not required. However, an effective HSI Program is just as important on a COTS...this phase is the contract, and the various design reviews, tests , and evaluations that occur to ensure that the system meets it goals. 3.3 DBCM ESM...Report(s). • HSI Approvals of Relevant Design Changes. • HSI Test Plans and Reports. • HSI Review Progress and Evaluation Memos and Reports. • HSI

  11. Developmental Cryogenic Active Telescope Testbed, a Wavefront Sensing and Control Testbed for the Next Generation Space Telescope

    NASA Technical Reports Server (NTRS)

    Leboeuf, Claudia M.; Davila, Pamela S.; Redding, David C.; Morell, Armando; Lowman, Andrew E.; Wilson, Mark E.; Young, Eric W.; Pacini, Linda K.; Coulter, Dan R.

    1998-01-01

    As part of the technology validation strategy of the next generation space telescope (NGST), a system testbed is being developed at GSFC, in partnership with JPL and Marshall Space Flight Center (MSFC), which will include all of the component functions envisioned in an NGST active optical system. The system will include an actively controlled, segmented primary mirror, actively controlled secondary, deformable, and fast steering mirrors, wavefront sensing optics, wavefront control algorithms, a telescope simulator module, and an interferometric wavefront sensor for use in comparing final obtained wavefronts from different tests. The developmental. cryogenic active telescope testbed (DCATT) will be implemented in three phases. Phase 1 will focus on operating the testbed at ambient temperature. During Phase 2, a cryocapable segmented telescope will be developed and cooled to cryogenic temperature to investigate the impact on the ability to correct the wavefront and stabilize the image. In Phase 3, it is planned to incorporate industry developed flight-like components, such as figure controlled mirror segments, cryogenic, low hold power actuators, or different wavefront sensing and control hardware or software. A very important element of the program is the development and subsequent validation of the integrated multidisciplinary models. The Phase 1 testbed objectives, plans, configuration, and design will be discussed.

  12. Phase IV of Early Restoration | NOAA Gulf Spill Restoration

    Science.gov Websites

    Trustees published the Final Phase IV Early Restoration Plan and Environmental Assessments. The plan habitats. Useful Links: Final Phase IV Early Restoration Plan and Environmental Assessments (pdf, 4.8 MB ) Final Phase IV Early Restoration Plan and Environmental Assessments Executive Summary (pdf, 729 KB

  13. Early Restoration | NOAA Gulf Spill Restoration

    Science.gov Websites

    Early Restoration Plan. On April 20, 2011 we reached an agreement with BP to start restoration planning draft plan for the third phase of early restoration in December 2013. We are considering your comments : All Phase III information and documents Phase II Useful Links: Phase II Early Restoration Plan &

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brandt, C.C.; Benson, S.B.; Beeler, D.A.

    The Clinch River Remedial Investigation (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. The remedial investigation is entering Phase 2, which has the following items as its objectives: define the nature and extent of the contamination in areas downstream from the DOE ORR, evaluate the human health and ecological risks posed by these contaminants, and perform preliminary identification and evaluation of potential remediationmore » alternatives. This plan describes the requirements, responsibilities, and roles of personnel during sampling, analysis, and data review for the Clinch River Environmental Restoration Program (CR-ERP). The purpose of the plan is to formalize the process for obtaining analytical services, tracking sampling and analysis documentation, and assessing the overall quality of the CR-ERP data collection program to ensure that it will provide the necessary building blocks for the program decision-making process.« less

  15. Planning and Estimation of Operations Support Requirements

    NASA Technical Reports Server (NTRS)

    Newhouse, Marilyn E.; Barley, Bryan; Bacskay, Allen; Clardy, Dennon

    2010-01-01

    Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D&NF LCC study, looking at the operations (phase E) cost drivers in more detail and extending the study to include 2 additional missions and identifies areas for increased emphasis by project management in order to improve the fidelity of operations estimates.

  16. OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE - A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gordon Tibbitts; Arnis Judzis

    2002-04-01

    This document details the progress to date on the OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE--A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING contract for the quarter starting January 2002 through March 2002. Accomplishments include the following: In accordance to Task 7.0 (D. No.2 Technical Publications) TerraTek, NETL, and the Industry Contributors successfully presented a paper detailing Phase 1 testing results at the February 2002 IADC/SPE Drilling Conference, a prestigious venue for presenting DOE and private sector drilling technology advances. The full reference is as follows: (1) IADC/SPE 74540 ''World's First Benchmarking of Drilling Mud Hammer Performance atmore » Depth Conditions'' authored by Gordon A. Tibbitts, TerraTek; Roy C. Long, US Department of Energy, Brian E. Miller, BP America, Inc.; Arnis Judzis, TerraTek; and Alan D. Black, TerraTek. Gordon Tibbitts, TerraTek, will presented the well-attended paper in February of 2002. The full text of the Mud Hammer paper was included in the last quarterly report. (2) The Phase 2 project planning meeting (Task 6) was held at ExxonMobil's Houston Greenspoint offices on February 22, 2002. In attendance were representatives from TerraTek, DOE, BP, ExxonMobil, PDVSA, Novatek, and SDS Digger Tools. (3) PDVSA has joined the advisory board to this DOE mud hammer project. PDVSA's commitment of cash and in-kind contributions were reported during the last quarter. (4) Strong Industry support remains for the DOE project. Both Andergauge and Smith Tools have expressed an interest in participating in the ''optimization'' phase of the program. The potential for increased testing with additional Industry cash support was discussed at the planning meeting in February 2002.« less

  17. Radiation Hard Silicon Particle Detectors for Phase-II LHC Trackers

    NASA Astrophysics Data System (ADS)

    Oblakowska-Mucha, A.

    2017-02-01

    The major LHC upgrade is planned after ten years of accelerator operation. It is foreseen to significantly increase the luminosity of the current machine up to 1035 cm-2s-1 and operate as the upcoming High Luminosity LHC (HL-LHC) . The major detectors upgrade, called the Phase-II Upgrade, is also planned, a main reason being the aging processes caused by severe particle radiation. Within the RD50 Collaboration, a large Research and Development program has been underway to develop silicon sensors with sufficient radiation tolerance for HL-LHC trackers. In this summary, several results obtained during the testing of the devices after irradiation to HL-LHC levels are presented. Among the studied structures, one can find advanced sensors types like 3D silicon detectors, High-Voltage CMOS technologies, or sensors with intrinsic gain (LGAD). Based on these results, the RD50 Collaboration gives recommendation for the silicon detectors to be used in the detector upgrade.

  18. Development, implementation, and evaluation of the Apollo model of pediatric rehabilitation service delivery.

    PubMed

    Camden, Chantal; Swaine, Bonnie; Tétreault, Sylvie; Bergeron, Sophie; Lambert, Carole

    2013-05-01

    This article presents the experience of a rehabilitation program that undertook the challenge to reorganize its services to address accessibility issues and improve service quality. The context in which the reorganization process occurred, along with the relevant literature justifying the need for a new service delivery model, and an historical perspective on the planning; implementation; and evaluation phases of the process are described. In the planning phase, the constitution of the working committee, the data collected, and the information found in the literature are presented. Apollo, the new service delivery model, is then described along with each of its components (e.g., community, group, and individual interventions). Actions and lessons learnt during the implementation of each component are presented. We hope by sharing our experiences that we can help others make informed decisions about service reorganization to improve the quality of services provided to children with disabilities, their families, and their communities.

  19. The development of a program analysis environment for Ada

    NASA Technical Reports Server (NTRS)

    Brown, David B.; Carlisle, Homer W.; Chang, Kai-Hsiung; Cross, James H.; Deason, William H.; Haga, Kevin D.; Huggins, John R.; Keleher, William R. A.; Starke, Benjamin B.; Weyrich, Orville R.

    1989-01-01

    A unit level, Ada software module testing system, called Query Utility Environment for Software Testing of Ada (QUEST/Ada), is described. The project calls for the design and development of a prototype system. QUEST/Ada design began with a definition of the overall system structure and a description of component dependencies. The project team was divided into three groups to resolve the preliminary designs of the parser/scanner: the test data generator, and the test coverage analyzer. The Phase 1 report is a working document from which the system documentation will evolve. It provides history, a guide to report sections, a literature review, the definition of the system structure and high level interfaces, descriptions of the prototype scope, the three major components, and the plan for the remainder of the project. The appendices include specifications, statistics, two papers derived from the current research, a preliminary users' manual, and the proposal and work plan for Phase 2.

  20. Corrective Action Investigation Plan for Corrective Action Unit 165: Areas 25 and 26 Dry Well and Washdown Areas, Nevada Test Site, Nevada (including Record of Technical Change Nos. 1, 2, and 3) (January 2002, Rev. 0)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 165 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 165 consists of eight Corrective Action Sites (CASs): CAS 25-20-01, Lab Drain Dry Well; CAS 25-51-02, Dry Well; CAS 25-59-01, Septic System; CAS 26-59-01, Septic System; CAS 25-07-06, Train Decontamination Area; CAS 25-07-07, Vehicle Washdown; CAS 26-07-01, Vehicle Washdown Station; and CAS 25-47-01, Reservoir and French Drain. All eight CASsmore » are located in the Nevada Test Site, Nevada. Six of these CASs are located in Area 25 facilities and two CASs are located in Area 26 facilities. The eight CASs at CAU 165 consist of dry wells, septic systems, decontamination pads, and a reservoir. The six CASs in Area 25 are associated with the Nuclear Rocket Development Station that operated from 1958 to 1973. The two CASs in Area 26 are associated with facilities constructed for Project Pluto, a series of nuclear reactor tests conducted between 1961 to 1964 to develop a nuclear-powered ramjet engine. Based on site history, the scope of this plan will be a two-phased approach to investigate the possible presence of hazardous and/or radioactive constituents at concentrations that could potentially pose a threat to human health and the environment. The Phase I analytical program for most CASs will include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons, polychlorinated biphenyls, and radionuclides. If laboratory data obtained from the Phase I investigation indicates the presence of contaminants of concern, the process will continue with a Phase II investigation to define the extent of contamination. Based on the results of Phase I sampling, the analytical program for Phase II investigation may be reduced. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less

  1. The commercial implications of the EELV program

    NASA Astrophysics Data System (ADS)

    Sasso, Steven E.

    1998-01-01

    There have been several studies over the past 15 years intended to define and develop a space launch system that would meet future needs of the United States Government (USG). While these past studies (Advanced Launch System, National Launch System, Spacelifter, etc) yielded valuable data, none were carried to fruition. Overriding issues included high development cost, changing requirements, and uncertainty in the mission model, as well lack of a clear direction for where this nation should be headed. In 1995, the Air Force embarked on the Evolved Expendable Launch Vehicle (EELV) program as a way of defining and developing the next-generation expendable launch system. This time groundrules for this effort were clearly defined-the program relied on the use of evolving a system rather than developing a high-technology solution to reduce development cost, and the commercial market was factored in as a way of reducing cost to the USG. The EELV program is nearing the engineering manufacturing development (EMD) phase by mid-1998 with first flight planned for early 2001. This paper describes the planned Lockheed Martin EELV program and its ability to utilize the commercial market to benefit the USG in its need to develop the next-generation expendable launch vehicle.

  2. Methyl Chloroform Elimination from the Production of Space Shuttle Sold Rocket Motors

    NASA Technical Reports Server (NTRS)

    Golde, Rick P.; Burt, Rick; Key, Leigh

    1997-01-01

    Thiokol Space Operations manufactures the Reusable Solid Rocket Motors used to launch America's fleet of Space Shuttles. In 1989, Thiokol used more than 1.4 Mlb of methyl chloroform to produce rocket motors. The ban placed by the Environmental Protection Agency on the sale of methyl chloroform had a significant effect on future Reusable Solid Rocket Motor production. As a result, changes in the materials and processes became necessary. A multiphased plan was established by Thiokol in partnership with NASA's Marshall Space Flight Center to eliminate the use of methyl chloroform in the Reusable Solid Rocket Motor production process. Because of the extensive scope of this effort, the plan was phased to target the elimination of the majority of methyl chloroform use (90 percent) by January 1, 1996, the 3 Environmental Protection Agency deadline. Referred to as Phase I, this effort includes the elimination of two large vapor degreasers, grease diluent processes, and propellant tooling handcleaning using methyl chloroform. Meanwhile, a request was made for an essential use exemption to allow the continued use of the remaining 10 percent of methyl chloroform after the 1996 deadline, while total elimination was pursued for this final, critical phase (Phase II). This paper provides an update to three previous presentations prepared for the 1993, 1994, and 1995 CFC/Halon Alternative Conferences, and will outline the overall Ozone Depleting Compounds Elimination Program from the initial phases through the final testing and implementation phases, including facility and equipment development. Processes and materials to be discussed include low-pressure aqueous wash systems, high-pressure water blast systems- environmental shipping containers, aqueous and semi-aqueous cleaning solutions, and bond integrity and inspection criteria. Progress toward completion of facility implementation and lessons learned during the scope of the program, as well as the current development efforts and basic requirements of future methyl chloroform handcleaning elimination, will also be outlined.

  3. A conceptual framework for international service-learning course planning: promoting a foundation for ethical practice in the physical therapy and occupational therapy professions.

    PubMed

    Lattanzi, Jill Black; Pechak, Celia

    2011-01-01

    As physical therapy (PT) and occupational therapy (OT) educational programs endeavor to foster core values of social responsibility, justice, and altruism in an increasingly global community, the incorporation of local and international service-learning (ISL) into the curriculum is growing. Much of the research has focused on the measurement of student learning, with little written about the impact on the host community. Proponents of global health initiatives are calling for consideration of all stakeholders to ensure ethical practice. This paper explores the current literature related to PT and OT ISL and builds a conceptual framework for ISL course planning. The essential phases in the framework include: 1) pre-experience planning/preparation stage, 2) field immersion experience stage, and 3) postexperience stage. The essential elements are: 1) cultural competency training, 2) communication and coordination with community, 3) comprehensive assessment, and 4) strategic planning. The authors suggest this framework as a practical tool to structure ISL courses with an explicit emphasis on ethical concerns. Additionally, they seek to foster more dialogue and action related to the promotion of ethical practices in ISL in PT and OT education programs.

  4. Hospital successes and failures indicate change in hospital marketing.

    PubMed

    Krampf, R F; Miller, D W

    1993-01-01

    Marketing has become an essential management function for hospitals during the past decade. A number of changes have occurred in hospital marketing as they have progressed through the marketing adoption process. A survey of Hospital CEOs reporting hospital successes and failures in the area of marketing have recently placed emphasis on sales and advertising based upon marketing research programs thus indicating entrance into the "Integrated Tactical Marketing" phase. This study also indicates that a few hospitals have entered the "Strategic Marketing Orientation" phase while future plans reported by the CEOs provide evidence that this trend is likely to continue.

  5. Four-dimensional dose reconstruction through in vivo phase matching of cine images of electronic portal imaging device

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yoon, Jihyung; Jung, Jae Won, E-mail: jungj@ecu.ed

    Purpose: A method is proposed to reconstruct a four-dimensional (4D) dose distribution using phase matching of measured cine images to precalculated images of electronic portal imaging device (EPID). Methods: (1) A phantom, designed to simulate a tumor in lung (a polystyrene block with a 3 cm diameter embedded in cork), was placed on a sinusoidally moving platform with an amplitude of 1 cm and a period of 4 s. Ten-phase 4D computed tomography (CT) images of the phantom were acquired. A planning target volume (PTV) was created by adding a margin of 1 cm around the internal target volume ofmore » the tumor. (2) Three beams were designed, which included a static beam, a theoretical dynamic beam, and a planning-optimized dynamic beam (PODB). While the theoretical beam was made by manually programming a simplistic sliding leaf motion, the planning-optimized beam was obtained from treatment planning. From the three beams, three-dimensional (3D) doses on the phantom were calculated; 4D dose was calculated by means of the ten phase images (integrated over phases afterward); serving as “reference” images, phase-specific EPID dose images under the lung phantom were also calculated for each of the ten phases. (3) Cine EPID images were acquired while the beams were irradiated to the moving phantom. (4) Each cine image was phase-matched to a phase-specific CT image at which common irradiation occurred by intercomparing the cine image with the reference images. (5) Each cine image was used to reconstruct dose in the phase-matched CT image, and the reconstructed doses were summed over all phases. (6) The summation was compared with forwardly calculated 4D and 3D dose distributions. Accounting for realistic situations, intratreatment breathing irregularity was simulated by assuming an amplitude of 0.5 cm for the phantom during a portion of breathing trace in which the phase matching could not be performed. Intertreatment breathing irregularity between the time of treatment and the time of planning CT was considered by utilizing the same reduced amplitude when the phantom was irradiated. To examine the phase matching in a humanoid environment, the matching was also performed in a digital phantom (4D XCAT phantom). Results: For the static, the theoretical, and the planning-optimized dynamic beams, the 4D reconstructed doses showed agreement with the forwardly calculated 4D doses within the gamma pass rates of 92.7%, 100%, and 98.1%, respectively, at the isocenter plane given by 3%/3 mm criteria. Excellent agreement in dose volume histogram of PTV and lung-PTV was also found between the two 4D doses, while substantial differences were found between the 3D and the 4D doses. The significant breathing irregularities modeled in this study were found not to be noticeably affecting the reconstructed dose. The phase matching was performed equally well in a digital phantom. Conclusions: The method of retrospective phase determination of a moving object under irradiation provided successful 4D dose reconstruction. This method will provide accurate quality assurance and facilitate adaptive therapy when distinguishable objects such as well-defined tumors, diaphragm, and organs with markers (pancreas and liver) are covered by treatment beam apertures.« less

  6. Four-dimensional dose reconstruction through in vivo phase matching of cine images of electronic portal imaging device.

    PubMed

    Yoon, Jihyung; Jung, Jae Won; Kim, Jong Oh; Yi, Byong Yong; Yeo, Inhwan

    2016-07-01

    A method is proposed to reconstruct a four-dimensional (4D) dose distribution using phase matching of measured cine images to precalculated images of electronic portal imaging device (EPID). (1) A phantom, designed to simulate a tumor in lung (a polystyrene block with a 3 cm diameter embedded in cork), was placed on a sinusoidally moving platform with an amplitude of 1 cm and a period of 4 s. Ten-phase 4D computed tomography (CT) images of the phantom were acquired. A planning target volume (PTV) was created by adding a margin of 1 cm around the internal target volume of the tumor. (2) Three beams were designed, which included a static beam, a theoretical dynamic beam, and a planning-optimized dynamic beam (PODB). While the theoretical beam was made by manually programming a simplistic sliding leaf motion, the planning-optimized beam was obtained from treatment planning. From the three beams, three-dimensional (3D) doses on the phantom were calculated; 4D dose was calculated by means of the ten phase images (integrated over phases afterward); serving as "reference" images, phase-specific EPID dose images under the lung phantom were also calculated for each of the ten phases. (3) Cine EPID images were acquired while the beams were irradiated to the moving phantom. (4) Each cine image was phase-matched to a phase-specific CT image at which common irradiation occurred by intercomparing the cine image with the reference images. (5) Each cine image was used to reconstruct dose in the phase-matched CT image, and the reconstructed doses were summed over all phases. (6) The summation was compared with forwardly calculated 4D and 3D dose distributions. Accounting for realistic situations, intratreatment breathing irregularity was simulated by assuming an amplitude of 0.5 cm for the phantom during a portion of breathing trace in which the phase matching could not be performed. Intertreatment breathing irregularity between the time of treatment and the time of planning CT was considered by utilizing the same reduced amplitude when the phantom was irradiated. To examine the phase matching in a humanoid environment, the matching was also performed in a digital phantom (4D XCAT phantom). For the static, the theoretical, and the planning-optimized dynamic beams, the 4D reconstructed doses showed agreement with the forwardly calculated 4D doses within the gamma pass rates of 92.7%, 100%, and 98.1%, respectively, at the isocenter plane given by 3%/3 mm criteria. Excellent agreement in dose volume histogram of PTV and lung-PTV was also found between the two 4D doses, while substantial differences were found between the 3D and the 4D doses. The significant breathing irregularities modeled in this study were found not to be noticeably affecting the reconstructed dose. The phase matching was performed equally well in a digital phantom. The method of retrospective phase determination of a moving object under irradiation provided successful 4D dose reconstruction. This method will provide accurate quality assurance and facilitate adaptive therapy when distinguishable objects such as well-defined tumors, diaphragm, and organs with markers (pancreas and liver) are covered by treatment beam apertures.

  7. The Use of Underground Research Laboratories to Support Repository Development Programs. A Roadmap for the Underground Research Facilities Network.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacKinnon, Robert J.

    2015-10-26

    Under the auspices of the International Atomic Energy Agency (IAEA), nationally developed underground research laboratories (URLs) and associated research institutions are being offered for use by other nations. These facilities form an Underground Research Facilities (URF) Network for training in and demonstration of waste disposal technologies and the sharing of knowledge and experience related to geologic repository development, research, and engineering. In order to achieve its objectives, the URF Network regularly sponsors workshops and training events related to the knowledge base that is transferable between existing URL programs and to nations with an interest in developing a new URL. Thismore » report describes the role of URLs in the context of a general timeline for repository development. This description includes identification of key phases and activities that contribute to repository development as a repository program evolves from an early research and development phase to later phases such as construction, operations, and closure. This information is cast in the form of a matrix with the entries in this matrix forming the basis of the URF Network roadmap that will be used to identify and plan future workshops and training events.« less

  8. Direct Broadcast Satellite: Radio Program

    NASA Astrophysics Data System (ADS)

    Hollansworth, James E.

    1992-10-01

    NASA is committed to providing technology development that leads to the introduction of new commercial applications for communications satellites. The Direct Broadcast Satellite-Radio (DBS-R) Program is a joint effort between The National Aeronautics and Space Administration (NASA) and The United States Information Agency/Voice of America (USIA/VOA) directed at this objective. The purpose of this program is to define the service and develop the technology for a direct-to-listener satellite sound broadcasting system. The DBS-R Program, as structured by NASA and VOA, is now a three-phase program designed to help the U.S. commercial communications satellite and receiver industry bring about this new communications service. Major efforts are being directed towards frequency planning hardware and service development, service demonstration, and experimentation with new satellite and receiver technology.

  9. Cost estimating methods for advanced space systems

    NASA Technical Reports Server (NTRS)

    Cyr, Kelley

    1994-01-01

    NASA is responsible for developing much of the nation's future space technology. Cost estimates for new programs are required early in the planning process so that decisions can be made accurately. Because of the long lead times required to develop space hardware, the cost estimates are frequently required 10 to 15 years before the program delivers hardware. The system design in conceptual phases of a program is usually only vaguely defined and the technology used is so often state-of-the-art or beyond. These factors combine to make cost estimating for conceptual programs very challenging. This paper describes an effort to develop parametric cost estimating methods for space systems in the conceptual design phase. The approach is to identify variables that drive cost such as weight, quantity, development culture, design inheritance and time. The nature of the relationships between the driver variables and cost will be discussed. In particular, the relationship between weight and cost will be examined in detail. A theoretical model of cost will be developed and tested statistically against a historical database of major research and development projects.

  10. Strategic Planning for Recruitment and Retention of Older African Americans in Health Promotion Research Programs.

    PubMed

    Dreer, Laura E; Weston, June; Owsley, Cynthia

    2014-01-01

    The purpose of this study was to 1) describe a strategic plan for recruitment and retention used in conducting eye health education research with African-Americans living in urban and rural areas of Alabama and 2) characterize recruitment and retention patterns for this community-based project. We evaluated an eye health education program tailored specifically to older African Americans. InCHARGE© was designed to promote eye disease prevention by conveying the personal benefits of annual, dilated, comprehensive eye care and teaching strategies to minimize barriers to regular eye care. The InCHARGE© program or a social contact control program was delivered at 20 senior centers in predominately African American urban and rural communities. From pooled data across three studies, 380 African Americans completed a questionnaire about knowledge and attitudes/beliefs about eye disease and eye care before the program and by telephone at either 3 or 6 months after the presentation. The project consisted of 4 phases and a total of 10 strategic objectives for recruitment as well as retention of older African Americans that were implemented in a systematic fashion. Overall, retention rates for follow-up at either 3 or 6 months were 75% and 66% respectively. African Americans from rural areas were more likely to be lost to follow-up compared to those from urban areas. We discuss the benefits of utilizing a strategic plan that serves to address problems with underrepresentation of minorities in clinical research.

  11. Comparison of composite prostate radiotherapy plan doses with dependent and independent boost phases.

    PubMed

    Narayanasamy, Ganesh; Avila, Gabrielle; Mavroidis, Panayiotis; Papanikolaou, Niko; Gutierrez, Alonso; Baacke, Diana; Shi, Zheng; Stathakis, Sotirios

    2016-09-01

    Prostate cases commonly consist of dual phase planning with a primary plan followed by a boost. Traditionally, the boost phase is planned independently from the primary plan with the risk of generating hot or cold spots in the composite plan. Alternatively, boost phase can be planned taking into account the primary dose. The aim of this study was to compare the composite plans from independently and dependently planned boosts using dosimetric and radiobiological metrics. Ten consecutive prostate patients previously treated at our institution were used to conduct this study on the Raystation™ 4.0 treatment planning system. For each patient, two composite plans were developed: a primary plan with an independently planned boost and a primary plan with a dependently planned boost phase. The primary plan was prescribed to 54 Gy in 30 fractions to the primary planning target volume (PTV1) which includes prostate and seminal vesicles, while the boost phases were prescribed to 24 Gy in 12 fractions to the boost planning target volume (PTV2) that targets only the prostate. PTV coverage, max dose, median dose, target conformity, dose homogeneity, dose to OARs, and probabilities of benefit, injury, and complication-free tumor control (P+) were compared. Statistical significance was tested using either a 2-tailed Student's t-test or Wilcoxon signed-rank test. Dosimetrically, the composite plan with dependent boost phase exhibited smaller hotspots, lower maximum dose to the target without any significant change to normal tissue dose. Radiobiologically, for all but one patient, the percent difference in the P+ values between the two methods was not significant. A large percent difference in P+ value could be attributed to an inferior primary plan. The benefits of considering the dose in primary plan while planning the boost is not significant unless a poor primary plan was achieved.

  12. New Generator Technology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nielsen, Roy S.

    2015-02-17

    New generator technology project is driven by the need to be able to remotely deploy generator technology where it is needed, when it is needed. Both the military and aid programs that provide assistance after disasters could use the ability to deploy energy generation that fits the needs of the situation. Currently, pre-specified generators are deployed, sometime more than half way around the world to provide electricity. Through our Phase-I to Phase III DARPA grant, we will provide a mechanism where a 3d print station and raw materials could be shipped to a deployment site and remotely deployed personnel. Thesemore » remote personnel can collaborate with engineers at a home location where 3d print plans can be optimized for the remote purpose. The plans can then be sent electronically to the remote location for printing, much like NASA sent the plans for a socket wrench to the International Space Station for printing in . If multiple generators need to be deployed at different remote locations, within miles of each other the printer rig can be moved to print the generators where they are needed. 3d printing is growing in the field of manufacturing. 3d printing has matured to the point where many types of materials are now available for many types of manufacturing. Both magnetic and electrically conductive material materials have recently been developed which can now lead to 3d printing of engines and generators. Our project will provide a successful printer rig that can be remotely deployed, to print a generator design in the field as well as provide a process for deploying the printed generator as well. This Systems Engineering Management Plan(SEMP) will provide the planning required for a Phase I DARPA grant that may also include goals for Phase II and Phase II grants. The SEMP provides a proposed project schedule, references, system engineering processes, specialty engineering system deployment and product support sections. Each section will state how our company will provide the necessary services to make this project succeed.« less

  13. Phase V of Early Restoration | NOAA Gulf Spill Restoration

    Science.gov Websites

    Phase V Early Restoration Plan and Environmental Assessment. The project will acquire land along Florida million. Phase V Early Restoration Plan and Environmental Assessment (pdf, 10 MB) Draft Phase V Early Restoration Plan and Environmental Assessment (Executive Summary) (2 MB) Phase V Fact Sheet (pdf, 2 MB) Gulf

  14. Onsite 40-kilowatt fuel cell power plant manufacturing and field test program

    NASA Technical Reports Server (NTRS)

    1985-01-01

    A joint Gas Research Institute and U.S. Department of Energy Program was initiated in 1982 to evaluate the use of fuel cell power systems for on-site energy service. Forty-six 40 kW fuel cell power plants were manufactured at the United Technologies Corporation facility in South Windsor, Connecticut, and are being delivered to host utilities and other program participants in the United States and Japan for field testing. The construction of the 46 fully-integrated power plants was completed in January 1985 within the constraints of the contract plan. The program has provided significant experience in the manufacture, acceptance testing, deployment, and support of on-site fuel cell systems. Initial field test results also show that these experimental power plants meet the performance and environmental requirements of a commercial specification. This Interim Report encompasses the design and manufacturing phases of the 40 kW Power Plant Manufacturing and Field Test program. The contract between UTC and NASA also provides UTC field engineering support to the host utilities, training programs and associated manuals for utility operating and maintenance personnel, spare parts support for a defined test period, and testing at UTC of a power plant made available from a preceding program phase. These activities are ongoing and will be reported subsequently.

  15. Risk Management for Human Support Technology Development

    NASA Technical Reports Server (NTRS)

    jones, Harry

    2005-01-01

    NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.

  16. Integrated In-space Transportation Plan

    NASA Technical Reports Server (NTRS)

    Farris, B.; Eberle, B.; Woodcock, G.; Negast, B.; Johnson, Les (Technical Monitor)

    2002-01-01

    The purpose of this report is to provide the reader with a readily accessible reference volume and history for the Integrated In-Space Transportation Plan (IISTP) phase I effort. This report was prepared by Gray Research, Inc. as a partial fulfillment of the Integrated Technology Assessment Center subcontract No. 4400037135 in support of the IISTP phase I effort within the In-Space Investment Area of the Advanced Space Transportation Program managed at Marshall Space Flight Center, Huntsville, Alabama. Much of the data used in the preparation of this report was taken from analyses, briefings, and reports prepared by the vast number of dedicated engineers and scientists who participated in the IISTP phase I effort. The opinions and ideas expressed in this report are solely those of the authors and do not necessarily reflect those of NASA in whole or in part. Reaching the outer solar system is a struggle against time and distance. The most distant planets are 4.5 to 6 billion kilometers from the Sun and to reach them in any reasonable time requires much higher values of specific impulse than can be achieved with conventional chemical rockets. In addition, the few spacecraft that have reached beyond Jupiter have used gravity assist, mainly by Jupiter, that is only available for a few months' period every 13 or so years. This permits only very infrequent missions and mission planners are very reluctant to accept travel times greater than about ten years since this is about the maximum for which one can have a realistic program plan. Advanced In-Space Propulsion (ISP) technologies will enable much more effective exploration of our Solar System and will permit mission designers to plan missions to "fly anytime, anywhere and complete a host of science objectives at the destinations' with greater reliability and safety. With a wide range of possible missions and candidate propulsion technologies with very diverse characteristics, the question of which technologies are "best" for future missions is a difficult one. The primary focus of the IISTP Phase I efforts were to: Develop, iterate and baseline future NASA requirements for In-Space Transportation; Define preliminary integrated architectures utilizing advanced ISP technologies; Identify and prioritize ISP technologies. The primary efforts of the IISTP Phase I process was to: Address Customer defined missions, mission priorities, mission requirements and technology preferences. Provide a forum for Technologists to advocate and have sufficiently considered any ISP technology for any mission of interest defined by the customer. Perform Systems analyses of the customer defined prioritized mission set to the degree necessary to support evaluation and prioritization of each technology advocated by the technologists. Perform Cost analyses on each of the technologies that were determined by systems analyses to be viable candidates for the customer defined mission set. Integrate all customers, technologists, systems, cost, program and project inputs into the final IISTP Prioritized set of technologies. The primary products of the IISTP Phase I effort were: Prioritized set of advanced ISP technologies that meet customer-provided requirements for customer prioritized mission sets; Recommendations of relative technology payoffs to guide augmentation investments.

  17. Integrated In-Space Transportation Plan

    NASA Astrophysics Data System (ADS)

    Farris, B.; Eberle, B.; Woodcock, G.; Negast, B.

    2002-10-01

    The purpose of this report is to provide the reader with a readily accessible reference volume and history for the Integrated In-Space Transportation Plan (IISTP) phase I effort. This report was prepared by Gray Research, Inc. as a partial fulfillment of the Integrated Technology Assessment Center subcontract No. 4400037135 in support of the IISTP phase I effort within the In-Space Investment Area of the Advanced Space Transportation Program managed at Marshall Space Flight Center, Huntsville, Alabama. Much of the data used in the preparation of this report was taken from analyses, briefings, and reports prepared by the vast number of dedicated engineers and scientists who participated in the IISTP phase I effort. The opinions and ideas expressed in this report are solely those of the authors and do not necessarily reflect those of NASA in whole or in part. Reaching the outer solar system is a struggle against time and distance. The most distant planets are 4.5 to 6 billion kilometers from the Sun and to reach them in any reasonable time requires much higher values of specific impulse than can be achieved with conventional chemical rockets. In addition, the few spacecraft that have reached beyond Jupiter have used gravity assist, mainly by Jupiter, that is only available for a few months' period every 13 or so years. This permits only very infrequent missions and mission planners are very reluctant to accept travel times greater than about ten years since this is about the maximum for which one can have a realistic program plan. Advanced In-Space Propulsion (ISP) technologies will enable much more effective exploration of our Solar System and will permit mission designers to plan missions to "fly anytime, anywhere and complete a host of science objectives at the destinations' with greater reliability and safety. With a wide range of possible missions and candidate propulsion technologies with very diverse characteristics, the question of which technologies are "best" for future missions is a difficult one. The primary focus of the IISTP Phase I efforts were to: Develop, iterate and baseline future NASA requirements for In-Space Transportation; Define preliminary integrated architectures utilizing advanced ISP technologies; Identify and prioritize ISP technologies. The primary efforts of the IISTP Phase I process was to: Address Customer defined missions, mission priorities, mission requirements and technology preferences. Provide a forum for Technologists to advocate and have sufficiently considered any ISP technology for any mission of interest defined by the customer. Perform Systems analyses of the customer defined prioritized mission set to the degree necessary to support evaluation and prioritization of each technology advocated by the technologists. Perform Cost analyses on each of the technologies that were determined by systems analyses to be viable candidates for the customer defined mission set. Integrate all customers, technologists, systems, cost, program and project inputs into the final IISTP Prioritized set of technologies. The primary products of the IISTP Phase I effort were: Prioritized set of advanced ISP technologies that meet customer-provided requirements for customer prioritized mission sets; Recommendations of relative technology payoffs to guide augmentation investments.

  18. Quality assurance plan for Solar Maximum Mission (SSM) Instruments electronic assembly - HRUV spectrometer/polarimeter

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The quality assurance program demonstrates recognition of the quality aspects and an organized approach to achieve them. It ensures that quality requirements are determined and satisfied throughout all phases of contract performance, including preliminary and engineering design, development, fabrication, processing, assembly, inspection, test, checkout, packaging, shipping, storage, maintenance field use, flight preparations, flight operations and post-flight analysis, as applicable.

  19. Genesis of an oak-fire science consortium

    Treesearch

    Keith W. Grabner; Michael C. Stambaugh; Richard P. Guyette; Daniel C. Dey; Gary D. Wilson

    2012-01-01

    With respect to fire management and practices, one of the most overlooked regions lies in the middle of the country. In this region there is a critical need for both recognition of fire’s importance and sharing of fire information and expertise. Recently we proposed and were awarded funding by the Joint Fire Science Program to initiate the planning phase for a regional...

  20. The Zero-Base Budget: A New Management Tool. Information Series, Volume 6, Number 4. Bulletin No. 7430.

    ERIC Educational Resources Information Center

    Buchmiller, Archie A.

    All indicators appear to point to a continuing and increased public interest in zero-based budgeting (ZBB). Despite its present popularity, ZBB is not new. The theory has been around for more than a decade and it draws heavily on existing systems, particularly on planning, programming, and budgeting systems. ZBB has two phases. The first is the…

Top