Contracts and Management Services FY 1996 Site Support Program Plan: WBS 6.10.14. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Knoll, J.M. Jr.
1995-09-01
This is the Contracts and Management Services site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail including cost accounting narrative summary, approved funding budget, and activity detailed description.
High performance computing and communications: FY 1997 implementation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-12-01
The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A providesmore » a detailed look at HPCC Program activities within each agency.« less
ISS Payload Operations: The Need for and Benefit of Responsive Planning
NASA Technical Reports Server (NTRS)
Nahay, Ed; Boster, Mandee
2000-01-01
International Space Station (ISS) payload operations are controlled through implementation of a payload operations plan. This plan, which represents the defined approach to payload operations in general, can vary in terms of level of definition. The detailed plan provides the specific sequence and timing of each component of a payload's operations. Such an approach to planning was implemented in the Spacelab program. The responsive plan provides a flexible approach to payload operations through generalization. A responsive approach to planning was implemented in the NASA/Mir Phase 1 program, and was identified as a need during the Skylab program. The current approach to ISS payload operations planning and control tends toward detailed planning, rather than responsive planning. The use of detailed plans provides for the efficient use of limited resources onboard the ISS. It restricts flexibility in payload operations, which is inconsistent with the dynamic nature of the ISS science program, and it restricts crew desires for flexibility and autonomy. Also, detailed planning is manpower intensive. The development and implementation of a responsive plan provides for a more dynamic, more accommodating, and less manpower intensive approach to planning. The science program becomes more dynamic and responsive as the plan provides flexibility to accommodate real-time science accomplishments. Communications limitations and the crew desire for flexibility and autonomy in plan implementation are readily accommodated with responsive planning. Manpower efficiencies are accomplished through a reduction in requirements collection and coordination, plan development, and maintenance. Through examples and assessments, this paper identifies the need to transition from detailed to responsive plans for ISS payload operations. Examples depict specific characteristics of the plans. Assessments identify the following: the means by which responsive plans accommodate the dynamic nature of science programs and the crew desire for flexibility; the means by which responsive plans readily accommodate ISS communications constraints; manpower efficiencies to be achieved through use of responsive plans; and the implications of responsive planning relative to resource utilization efficiency.
The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan
NASA Technical Reports Server (NTRS)
Bronstein, L.; Kawamoto, Y.; Riberich, J. J.; Scope, J. R.; Forman, B. J.; Bergman, S. G.; Reisenfeld, S.
1981-01-01
The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.
7 CFR 3430.1007 - Planning activities.
Code of Federal Regulations, 2012 CFR
2012-01-01
... ADMINISTRATIVE PROVISIONS Sun Grant Program § 3430.1007 Planning activities. (a) Required plan. The Centers and... program. Proposals submitted to the Sun Grant Program must be sufficiently detailed and of high enough...
7 CFR 3430.1007 - Planning activities.
Code of Federal Regulations, 2013 CFR
2013-01-01
... ADMINISTRATIVE PROVISIONS Sun Grant Program § 3430.1007 Planning activities. (a) Required plan. The Centers and... program. Proposals submitted to the Sun Grant Program must be sufficiently detailed and of high enough...
7 CFR 3430.1007 - Planning activities.
Code of Federal Regulations, 2011 CFR
2011-01-01
... ADMINISTRATIVE PROVISIONS Sun Grant Program § 3430.1007 Planning activities. (a) Required plan. The Centers and... program. Proposals submitted to the Sun Grant Program must be sufficiently detailed and of high enough...
7 CFR 3430.1007 - Planning activities.
Code of Federal Regulations, 2014 CFR
2014-01-01
... ADMINISTRATIVE PROVISIONS Sun Grant Program § 3430.1007 Planning activities. (a) Required plan. The Centers and... program. Proposals submitted to the Sun Grant Program must be sufficiently detailed and of high enough...
23 CFR 1200.25 - Improvement plan.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Implementation and Management of the Highway Safety Program § 1200.25 Improvement plan. If a review of the Annual... improvement plan. This plan will detail strategies, program activities, and funding targets to meet the...
Site support program plan for ICF Kaiser Hanford Company
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dieterle, S.E.
1996-09-27
The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-03-01
Appendix II of The Woodlands Metro Center Energy Study near Houston consists of the following: Metro Center Program, Conventional Plan Building Prototypes and Detail Parcel Analysis, Energy Plan Building Prototypes, and Energy Plan Detail Parcel Analysis.
How Strategic Planning Keeps You Sane when Delivering Distance Programs
ERIC Educational Resources Information Center
MacNeil, Dixie; Luzius, Kim; Dunkin, Sonya
2010-01-01
This paper details the advantages of creating a strategic plan in the development and delivery of distance programs at the authors' own institution. The steps involved in the planning process and the three key elements of a successful strategic plan are addressed. The key elements include a program plan explaining the roles/responsibilities of…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.
FIREFAMILY: Fire planning with historic weather data.
William A. Main; Robert J. Straub; Donna M. Paananen
1982-01-01
This user's guide will help fire managers interpret the output from FIREFAMILY, a computer program that uses historic weather data for fire planning. The guide describes options within the program and explains various tables and graphs necessary for planning. It also provides details which computer specialists need to run the program.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.
Louisiana Airport System Plan Five-Year Capital Improvement Program.
DOT National Transportation Integrated Search
1992-07-01
The Louisiana Airport System Plan (LASP) Five-Year-Capital Improvement Program (CIP) is a development plan for all commercial service, reliever, and general aviation airports in Louisiana. It is a detailed listing of potential projects based on the a...
Andrews University Master Plan for Campus Expansion and the Development Program, 1977-1985.
ERIC Educational Resources Information Center
Smoot, Joseph G.
Described in detail in this partly promotional, partly informational publication are the history of campus planning, new master plan, and new capital programs of this Seventh Day Adventist institution. Numerous maps, photographs, and tables of financial and statistical data illustrate the plan. (MSE)
Successful Family Planning Programs. Draper World Population Fund Report, No. 4, Summer 1977.
ERIC Educational Resources Information Center
Piotrow, Phyllis T., Ed.
This publication describes successful family planning programs throughout the world. Discussed in detail are programs in Colombia, Mauritius, Maharashtra, the People's Republic of China, Sri Lanka, and the United States. Photographs illustrate the articles and, in some cases, family planning vital statistics are given. The Draper World Population…
Forest and farmland conservation effects of Oregon's (USA) land-use planning program.
Jeffrey D. Kline
2005-01-01
Oregon's land-use planning program is often cited as an exemplary approach to forest and farmland conservation, but analyses of its effectiveness are limited. This article examines Oregon's land-use planning program using detailed spatial data describing building densities in western Oregon. An empirical model describes changes in building densities on forest...
Metrication report to the Congress
NASA Technical Reports Server (NTRS)
1991-01-01
NASA's principal metrication accomplishments for FY 1990 were establishment of metrication policy for major programs, development of an implementing instruction for overall metric policy and initiation of metrication planning for the major program offices. In FY 1991, development of an overall NASA plan and individual program office plans will be completed, requirement assessments will be performed for all support areas, and detailed assessment and transition planning will be undertaken at the institutional level. Metric feasibility decisions on a number of major programs are expected over the next 18 months.
Very Low-Cost Nutritious Diet Plans Designed by Linear Programming.
ERIC Educational Resources Information Center
Foytik, Jerry
1981-01-01
Provides procedural details of Linear Programing, developed by the U.S. Department of Agriculture to devise a dietary guide for consumers that minimizes food costs without sacrificing nutritional quality. Compares Linear Programming with the Thrifty Food Plan, which has been a basis for allocating coupons under the Food Stamp Program. (CS)
Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan
NASA Technical Reports Server (NTRS)
Smith, Janice F. (Compiler); Forrest, Larry
1993-01-01
A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.
Definition study for variable cycle engine testbed engine and associated test program
NASA Technical Reports Server (NTRS)
Vdoviak, J. W.
1978-01-01
The product/study double bypass variable cycle engine (VCE) was updated to incorporate recent improvements. The effect of these improvements on mission range and noise levels was determined. This engine design was then compared with current existing high-technology core engines in order to define a subscale testbed configuration that simulated many of the critical technology features of the product/study VCE. Detailed preliminary program plans were then developed for the design, fabrication, and static test of the selected testbed engine configuration. These plans included estimated costs and schedules for the detail design, fabrication and test of the testbed engine and the definition of a test program, test plan, schedule, instrumentation, and test stand requirements.
Phase C/D program development plan. Volume 1: Program plan
NASA Technical Reports Server (NTRS)
1971-01-01
The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-14
...; State Administrative Plan for the Hazard Mitigation Grant Program AGENCY: Federal Emergency Management...: Collection of Information Title: State Administrative Plan for the Hazard Mitigation Grant Program. Type of... guide that details how the State will administer the Hazard Mitigation Grant Program (HMGP). An approved...
Program of Research for Forests and Associated Rangelands
Nelson S. Loftus; Joseph G. Massey; [Compilers
1978-01-01
This research plan for the Southern Region is a companion publication to the National Program of Research for Forests and Associated Rangelands. While the national program reflects both regional and national priorities, this plan provides details on forestry research matters concerning the South. For the reader's convenience, background information on development...
ERIC Educational Resources Information Center
Brooks, Kenneth W.
The guide details characteristics to provide architecturally accessible special education programs for handicapped students. Impetus for the accessibility movement is traced to legislation, including the Architectural Barriers Act and Sections 503 and 504 of the Rehabilitation Act of 1973. Planning features considered are the development of a…
Study of solid rocket motors for a space shuttle booster. Volume 3: Program acquisition planning
NASA Technical Reports Server (NTRS)
Vonderesch, A. H.
1972-01-01
Plans for conducting Phase C/D for a solid rocket motor booster vehicle are presented. Methods for conducting this program with details of scheduling, testing, and program management and control are included. The requirements of the space shuttle program to deliver a minimum cost/maximum reliability booster vehicle are examined.
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
DORCA 2 computer program. Volume 3: Program listing
NASA Technical Reports Server (NTRS)
Carey, J. B.
1972-01-01
A program listing for the Dynamic Operational Requirements and Cost Analysis Program is presented. Detailed instructions for the computer programming involved in space mission planning and project requirements are developed.
50 CFR 15.26 - Approval of cooperative breeding programs.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-sustaining population in captivity of the exotic bird species; (iii) Details on the system of recordkeeping... the exotic bird species in the world; (v) Details on the funding of this program; and (vi) Plans for... program intended to enhance the survival of the population from which the exotic bird species was or would...
Pupil Progression Plan: Requirements and Procedures 1982-83.
ERIC Educational Resources Information Center
Duval County School Board, Jacksonville, FL.
The Pupil Progression Plan detailed in this document was developed in response to Florida's Educational Accountability Act, which requires each school district to establish a comprehensive program for pupil progression, and to fulfill the requirements of school board policy. The first section details general procedures for promotion, grades K-12.…
NASA Year 2000 (Y2K) Program Plan
NASA Technical Reports Server (NTRS)
1998-01-01
NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.
ERIC Educational Resources Information Center
DAVIDSON, JOHN W.; PELLEGRIN, LIONEL O.
THE LOUISIANA STATE PLAN INCLUDES ADMINISTRATIVE INFORMATION, PROCEDURES FOR SELECTING COMMUNITY PROBLEMS, INSTITUTIONS, AND REVIEWING APPLICATIONS, FISCAL AND INSTITUTIONAL ASSURANCES, ACCOUNTING PROCEDURES, REVIEW AND EVALUATION OF PROGRAMS, TRANSFER OF FUNDS, REPORTS, DETAILS OF THE ANNUAL PROGRAM, AND ELIGIBILITY OF PROGRAMS. GENERAL PROBLEM…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Turner, L.R.; Praeg, W.F.
1982-03-01
The experimental requirements, test-bed design, and computational requirements are reviewed and updated. Next, in Sections 3, 4 and 5, the experimental plan, instrumentation, and computer plan, respectively, are described. Finally, Section 6 treats other considerations, such as personnel, outside participation, and distribution of results.
Implementation of a new advanced graduate education program in oral implantology.
Gallucci, German O; Weber, Hans Peter; Kalenderian, Elsbeth
2012-10-01
The academic program for the Harvard School of Dental Medicine's Advanced Graduate Program in Oral Implantology is based on scientific evidence applied to educational quality, translational research, patient care, and service. The objective of the program is to enable highly motivated individuals with proven scholarship and excellence in patient care to achieve academic leadership in the clinical and scientific fields of implant dentistry and tissue regeneration. A detailed curriculum describing the academic program, as well as a business plan (which included a management plan describing the organizational structure, financial implications, and market forces) and implementation and communication plans, were developed before moving forward. With careful academic and business planning, the result was a vibrant implant program, in which all placements and restorations of implants are coordinated with regard to practice management. The program is integrated into the existing clinical care model and has been financially self-sustaining from its inception. Six students have participated in the last two years. On average, each student performed seventy-nine procedures on twenty-nine patients, generating over $46,000 in production. The curriculum includes didactics, hands-on clinical learning, and research activities. Research is a critical component as well. The results demonstrate that the time taken to develop a detailed curriculum and business plan for a new academic program, which anticipated and resolved potential barriers to success, was instrumental in the successful implementation of an oral implantology residency program.
ERIC Educational Resources Information Center
Nebraska State Dept. of Education, Lincoln.
This manual contains a series of 10 detailed guides for school practitioners who are beginning to create work-based learning programs at their schools. Work-Based Learning Overview defines the different elements of work-based learning and describes the roles of program participants. Program Planning Guide offers suggestions about how to plan…
X-43 Hypersonic Vehicle Technology Development
NASA Technical Reports Server (NTRS)
Voland, Randall T.; Huebner, Lawrence D.; McClinton, Charles R.
2005-01-01
NASA recently completed two major programs in Hypersonics: Hyper-X, with the record-breaking flights of the X-43A, and the Next Generation Launch Technology (NGLT) Program. The X-43A flights, the culmination of the Hyper-X Program, were the first-ever examples of a scramjet engine propelling a hypersonic vehicle and provided unique, convincing, detailed flight data required to validate the design tools needed for design and development of future operational hypersonic airbreathing vehicles. Concurrent with Hyper-X, NASA's NGLT Program focused on technologies needed for future revolutionary launch vehicles. The NGLT was "competed" by NASA in response to the President s redirection of the agency to space exploration, after making significant progress towards maturing technologies required to enable airbreathing hypersonic launch vehicles. NGLT quantified the benefits, identified technology needs, developed airframe and propulsion technology, chartered a broad University base, and developed detailed plans to mature and validate hypersonic airbreathing technology for space access. NASA is currently in the process of defining plans for a new Hypersonic Technology Program. Details of that plan are not currently available. This paper highlights results from the successful Mach 7 and 10 flights of the X-43A, and the current state of hypersonic technology.
SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vienna, John D.; Todd, Terry A.; Peterson, Mary E.
2012-11-26
This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.
NASA ELV Payload Safety Program Information Exchange
NASA Technical Reports Server (NTRS)
Staubus, Cal; Palo, Tom; Dook, Mike; Donovan, Shawn
2007-01-01
This presentation details the Expendable Launch Vehicle (ELV) Payload Safety Program in its development and plan for implementation. It is an overview of the program's policies, process and requirements.
TRU Waste Management Program. Cost/schedule optimization analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
Computerized fracture critical and specialized bridge inspection program with NDE applications
NASA Astrophysics Data System (ADS)
Fish, Philip E.
1998-03-01
Wisconsin Department of Transportation implemented a Fracture Critical & Specialized Inspection Program in 1987. The program has a strong emphasis on Nondestructive Testing (NDT). The program is also completely computerized, using laptop computers to gather field data, digital cameras for pictures, and testing equipment with download features. Final inspection reports with detailed information can be delivered within days of the inspection. The program requires an experienced inspection team and qualified personnel. Individuals performing testing must be licensed ASNT (American Society for Nondestructive Testing) Level III and must be licensed Certified Weld Inspectors (American Welding Society). Several critical steps have been developed to assure that each inspection identifies all possible deficiencies that may be possible on a Fracture Critical or Unique Bridge. They include; review of all existing plans and maintenance history; identification of fracture critical members, identification of critical connection details, welds, & fatigue prone details, development of visual and NDE inspection plan; field inspection procedures; and a detailed formal report. The program has found several bridges with critical fatigue conditions which have resulted in replacement or major rehabilitation. In addition, remote monitoring systems have been installed on structures with serious cracking to monitor for changing conditions.
Environmental Hazards Assessment Program annual report, [June 1992--June 1993
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-10-01
This report, the Environment Hazards Assessment Program (EHAP) Annual Report, is the second of three reports that document activities under the EHAP grant and details progress made during the first year of the grant. The first year was devoted to the development of a working program implementation plan. During the developmental process some key objectives were achieved such as developing a Doctor of Philosophy degree program in Environmental Studies at MUSC (Medical University of South Carolina) and conducting the first Crossroads of Humanity series Round Table Forum. The PIP (Program Implementation Program) details the objectives, management and budgetary basis formore » the overall management and control of the grant over the next four years, the yearly program plans provide the monthly and day-to-day programmatic and budgetary control by which the PIP was developed.« less
NASA Technical Reports Server (NTRS)
1989-01-01
The Life Science Division of the NASA Office of Space Science and Applications (OSSA) describes its plans for assuring the health, safety, and productivity of astronauts in space, and its plans for acquiring further fundamental scientific knowledge concerning space life sciences. This strategic implementation plan details OSSA's goals, objectives, and planned initiatives. The following areas of interest are identified: operational medicine; biomedical research; space biology; exobiology; biospheric research; controlled ecological life support; flight programs and advance technology development; the life sciences educational program; and earth benefits from space life sciences.
In Brief: Climate Change Technology Program Plan
NASA Astrophysics Data System (ADS)
Bierly, Eugene
2006-09-01
The U.S. Department of Energy released its Plan for Climate Change Technology Programs (CCTP) at a 20 September hearing of the U.S. House of Representatives Science Subcommittee on energy. The goal of the hearing, which was chaired by Rep. Judy Biggert (R-Ill.), was to examine the Bush Administration's CCTP plan, review it in light of the Administration's stated goals, and determine what action might be undertaken to implement the plan. For details of the plan, see http://www.climatetechnology.gov/stratplan/final/index.htm
Space Station Freedom operations planning
NASA Technical Reports Server (NTRS)
Accola, Anne L.; Keith, Bryant
1989-01-01
The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.
Planning and Equipping Industrial Arts Facilities.
ERIC Educational Resources Information Center
Maine State Dept. of Educational and Cultural Services, Augusta. Bureau of Vocational Education.
Architectural details, planning, and facility guidelines for industrial arts facilities are given, with data on planning the number, shape, size, and location of school shops. Industrial art programing and performance criteria for varying levels of education are discussed with regard for the different shop curriculums. The facility planning is…
ERIC Educational Resources Information Center
Sclafane, Jamie Heather; Merves, Marni Loiacono; Rivera, Angelic; Long, Laura; Wilson, Ken; Bauman, Laurie J.
2012-01-01
The Turn the Tables Technique (T[cube]) is an activity designed to provide group facilitators who lead HIV/STI prevention and sexual health promotion programs with detailed and current information on teenagers' sexual behaviors and beliefs. This information can be used throughout a program to tailor content. Included is a detailed lesson plan of…
ERIC Educational Resources Information Center
Johnsen, Susan K., Ed.
2012-01-01
The new Pre-K-Grade 12 Gifted Education Programming Standards should be part of every school district's repertoire of standards to ensure that the learning needs of advanced students are being met. "NAGC Pre-K-Grade 12 Gifted Education Programming Standards: A Guide to Planning and Implementing High-Quality Services" details six standards that…
Study on utilization of advanced composites in commercial aircraft wing structures, volume 2
NASA Technical Reports Server (NTRS)
Sakata, I. F.; Ostrom, R. B.
1978-01-01
A plan is defined for a composite wing development effort which will assist commercial transport manufacturers in reaching a level of technology readiness where the utilization of composite wing structure is a cost competitive option for a new aircraft production plan. The recommended development effort consists of two programs: a joint government/industry material development program and a wing structure development program. Both programs are described in detail.
Nutrition and Meal Planning in Child-Care Programs: A Practical Guide.
ERIC Educational Resources Information Center
Edelstein, Sari
Designed to assist child care center managers in planning nutritious meals for children in centers or licensed home day care programs, this guide presents information on the nutritional requirements of infants and children, sample menus for child care centers, and resources for further information. The first part of the guide details the…
ERIC Educational Resources Information Center
Cleven, Arlene M.
The course guide has been prepared to aid in planning and conducting a training program in emergency medical care for first responders to traffic accidents (expected to be patrolling law enforcement officers). This document contains a detailed description of the training program; suggestions for course planning including class size, scheduling…
Detailed Test Plan Redundant Sensor Strapdown IMU Evaluation Program
NASA Technical Reports Server (NTRS)
Hartwell, T.; Miyatake, Y.; Wedekind, D. E.
1971-01-01
The test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The subjects discussed are: (1) test philosophy and limitations, (2) test sequence, (3) equipment specifications, (4) general operating procedures, (5) calibration procedures, (6) alignment test phase, and (7) navigation test phase. The data and analysis requirements are analyzed.
The planning and control of NASA programs and resources
NASA Technical Reports Server (NTRS)
1983-01-01
The major management systems used to plan and control NASA programs and resources are described as well as their integration to form the agency's general management approach in carrying out its mission. Documents containing more detailed descriptions of the processes and techniques involved in the agency's major management systems are listed.
NASA Technical Reports Server (NTRS)
2002-01-01
The Mission of the NSBRI will be to lead a National effort for accomplishing the integrated, critical path, biomedical research necessary to support the long term human presence, development, and exploration of space and to enhance life on Earth by applying the resultant advances in human knowledge and technology acquired through living and working in space. To carry out this mission, the NSBRI focuses its activities on three Strategic Programs: Strategic Program 1: Countermeasure Research Strategic Program 2: Education, Training and Outreach Strategic Program 3: Cooperative Research and Development. This document contains the detailed Team Strategic Plans for the 11 research teams focused on Strategic Program 1, and the Education and Outreach Team focused on Strategic Program 2. There is overlap and integration among the Programs and Team Strategic Plans, as described in each of the Plans.
NASA Astrophysics Data System (ADS)
Koelle, H. H.; Stephenson, D. G.
2003-04-01
This report is an initial review of plans for a extensive program to survey and develop the Moon and to explore the planet Mars during the 21st century. It presents current typical plans for separate, associated and fully integrated programs of Lunar and Martian research, exploration and development, and concludes that detailed integrated plans must be prepared and be subject to formal criticism. Before responsible politicians approve a new thrust into space they will demand attractive, defensible, and detailed proposals that explain the WHEN, HOW and WHY of each stage of an expanded program of 21st century space research, development and exploration. In particular, the claims of daring, innovative, but untried systems must be compared with the known performance of existing technologies. The time has come to supersede the present haphazard approach to strategic space studies with a formal international structure to plan for future advanced space missions under the aegis of the world's national space agencies, and supported by governments and the corporate sector.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-10-01
This document supersedes the previous one, taking into account changes that have taken place in the CFS Science and Technology (S and T) program structure and organization, and in the structure of the Program of Energy Research and Development, the source of funding for CFS bioenergy research. It explains the rationale and overall objective for the bioenergy research program and briefly reviews the accomplishments to date. It indicates the planning context within which the program operates, states the specific objectives for the period of the plan, and details the strategic priorities developed for this period. Finally, it outlines the implementationmore » process for the plan.« less
Code of Federal Regulations, 2013 CFR
2013-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...
Succession Planning for Library Instruction
ERIC Educational Resources Information Center
Sobel, Karen; Drewry, Josiah
2015-01-01
Detailed succession planning helps libraries pass information from one employee to the next. This is crucial in preparing for hiring, turnover, retirements, training of graduate teaching assistants in academic libraries, and other common situations. The authors of this article discuss succession planning for instruction programs in academic…
Process Evaluation for a Prison-based Substance Abuse Program.
ERIC Educational Resources Information Center
Staton, Michele; Leukefeld, Carl; Logan, T. K.; Purvis, Rick
2000-01-01
Presents findings from a process evaluation conducted in a prison-based substance abuse program in Kentucky. Discusses key components in the program, including a detailed program description, modifications in planned treatment strategies, program documentation, and perspectives of staff and clients. Findings suggest that prison-based programs have…
An implementation plan for priorities in solar-system space physics
NASA Technical Reports Server (NTRS)
Krimigis, Stamatios M.; Athay, R. Grant; Baker, Daniel; Fisk, Lennard A.; Fredricks, Robert W.; Harvey, John W.; Jokipii, Jack R.; Kivelson, Margaret; Mendillo, Michael; Nagy, Andrew F.
1985-01-01
The scientific objectives and implementation plans and priorities of the Space Science Board in areas of solar physics, heliospheric physics, magnetospheric physics, upper atmosphere physics, solar-terrestrial coupling, and comparative planetary studies are discussed and recommended programs are summarized. Accomplishments of Skylab, Solar Maximum Mission, Nimbus-7, and 11 other programs are highlighted. Detailed mission plans in areas of solar and heliospheric physics, plasma physics, and upper atmospheric physics are also described.
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
The 1980 Census: The Counting of America. Population Bulletin, Vol. 34, No. 4.
ERIC Educational Resources Information Center
Francese, Peter K.
The booklet describes the United States Census Bureau program for conducting and making available the results of the 1980 census which will attempt to reach 80 million households. It examines in detail the questionnaire itself, the planning that went into it, the Census Bureau plans and programs for eliciting public cooperation and finding…
Enrollments in the Academic Majors: Trends between Fall 1996 and Fall 2000. Volume One.
ERIC Educational Resources Information Center
Nova Southeastern Univ., Fort Lauderdale, FL.
This study examined enrollment trends at the level of individual majors for Nova Southeastern University, Florida. The results should provide support for the evaluation of the major, enrollment planning at the program and center levels, and more detailed context for program review and university strategic planning. The study includes an analysis…
Emissions and new technology programs for conventional spark-ignition aircraft engines
NASA Technical Reports Server (NTRS)
Wintucky, W. T.
1976-01-01
A long-range technology plan in support of general aviation engines was formulated and is being implemented at the Lewis Research Center. The overall program was described, and that part of the program that represents the in-house effort at Lewis was presented in detail. Three areas of government and industry effort involving conventional general-aviation piston engines were part of a coordinated overall plan: (1) FAA/NASA joint program, (2) NASA contract exhaust emissions pollution reduction program, and (3) NASA in-house emissions reduction and new technology program.
40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... may come from plans you developed for other purposes such as a Standard Operating Procedure manual or... source is operational. The SSM plan provides detailed procedures for operating and maintaining your...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... may come from plans you developed for other purposes such as a Standard Operating Procedure manual or... source is operational. The SSM plan provides detailed procedures for operating and maintaining your...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
Fitzner, Karen; Fox, Kathe; Schmidt, Joseph; Roberts, Mark; Rindress, Donna; Hay, Joel
2005-08-01
Despite widespread adoption of disease management (DM) programs by US health plans, gaps remain in the evidence for their benefit. The Disease Management Outcomes Consolidation Survey was designed to gather data on DM programs for commercial health plans, to assess program success and DM effectiveness. The questionnaire was mailed to 292 appropriate health plan contacts; 26 plans covering more than 14 million commercial members completed and returned the survey. Respondents reported that DM plays a significant and increasing role in their organizations. Key reasons for adopting DM were improving clinical outcomes, reducing medical costs and utilization, and improving member satisfaction. More respondents were highly satisfied with clinical results than with utilization or cost outcomes of their programs (46%, 17%, and 13%, respectively). Detailed results were analyzed for 57 DM programs with over 230,000 enrollees. Most responding plans offered DM programs for diabetes and asthma, with return on investment (ROI) ranging from 0.16:1 to 4:1. Weighted by number of enrollees per DM program, average ROI was 2.56:1 for asthma (n = 1,136 enrollees) and 1.98:1 for diabetes (n = 25,364). Most (but not all) respondents reported reduced hospital admissions, increasing rates of preventive care, and improved clinical measures. Few respondents provided detailed information about DM programs for other medical conditions, but most that did reported positive outcomes. Lack of standardized methodology was identified as a major barrier to in-house program evaluation. Although low response rate precluded drawing many general conclusions, a clear need emerged for more rigorous evaluation methods and greater standardization of outcomes measurement.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant, C W; Lenderman, J S; Gansemer, J D
This document is an update to the 'ADIS Algorithm Evaluation Project Plan' specified in the Statement of Work for the US-VISIT Identity Matching Algorithm Evaluation Program, as deliverable II.D.1. The original plan was delivered in August 2010. This document modifies the plan to reflect modified deliverables reflecting delays in obtaining a database refresh. This document describes the revised schedule of the program deliverables. The detailed description of the processes used, the statistical analysis processes and the results of the statistical analysis will be described fully in the program deliverables. The US-VISIT Identity Matching Algorithm Evaluation Program is work performed bymore » Lawrence Livermore National Laboratory (LLNL) under IAA HSHQVT-07-X-00002 P00004 from the Department of Homeland Security (DHS).« less
Employability Planning Process. STIP II (Skill Training Improvement Programs Round II).
ERIC Educational Resources Information Center
Los Angeles Community Coll. District, CA.
Four reports are presented detailing procedures for improving the employability of students enrolled in the Los Angeles Community College District's Skill Training Improvement Programs (STIP II). Each report was submitted by one of the four STIP II programs: Los Angeles Southwest College's program for computer programming; the programs for…
Multi-community command and control systems in law enforcement: An introductory planning guide
NASA Technical Reports Server (NTRS)
Sohn, R. L.; Garcia, E. A.; Kennedy, R. D.
1976-01-01
A set of planning guidelines for multi-community command and control systems in law enforcement is presented. Essential characteristics and applications of these systems are outlined. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Program management techniques and joint powers agreements for multicommunity programs are discussed in detail. A description of a typical multi-community computer-aided dispatch system is appended.
Training Program for Emergency Medical Technician: Dispatcher. 2--Instructor Lesson Plans.
ERIC Educational Resources Information Center
National Highway Traffic Safety Administration (DOT), Washington, DC.
Intended to assist instructors who wish to conduct a training course for emergency medical technicians (EMTs) serving as dispatchers, this document contains detailed lesson plans organized to structure course presentations. Each lesson plan includes the following elements: unit objectives; suggestions for adapting the lessons to local policies and…
A Guide for Planning Indoor Facilities for College Physical Education.
ERIC Educational Resources Information Center
Crawford, Wayne H.
Following a general consideration of the functional aspects of planning facilities and the relationship between program and facilities, a detailed presentation is made of planning buildings for college and university indoor physical education activities. Recommendations are made with regard to design, structural and functional features of…
40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... the procedures may come from plans you developed for other purposes such as a Standard Operating... as long as the source is operational. The SSM plan provides detailed procedures for operating and...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... the procedures may come from plans you developed for other purposes such as a Standard Operating... as long as the source is operational. The SSM plan provides detailed procedures for operating and...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... the procedures may come from plans you developed for other purposes such as a Standard Operating... as long as the source is operational. The SSM plan provides detailed procedures for operating and...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
ERIC Educational Resources Information Center
Holmes, George W., III; Seawell, William H.
This report presents (1) details of a program for educational administration by objectives and (2) the results of such a program developed by the Virginia State Department of Education to upgrade the quality of education in the public schools of that State. Administration by objectives is a systematic approach to education planning using…
Koelle, H H; Stephenson, D G
2003-04-01
This report is an initial review of plans for a extensive program to survey and develop the Moon and to explore the planet Mars during the 21st century. It presents current typical plans for separate, associated and fully integrated programs of Lunar and Martian research, exploration and development, and concludes that detailed integrated plans must be prepared and be subject to formal criticism. Before responsible politicians approve a new thrust into space they will demand attractive, defensible, and detailed proposals that explain the WHEN, HOW and WHY of each stage of an expanded program of 21st century space research, development and exploration. In particular, the claims of daring, innovative, but untried systems must be compared with the known performance of existing technologies. The time has come to supersede the present haphazard approach to strategic space studies with a formal international structure to plan for future advanced space missions under the aegis of the world's national space agencies, and supported by governments and the corporate sector. c2002 Elsevier Science Ltd. All rights reserved.
Developing an Intergenerational Program.
ERIC Educational Resources Information Center
Brummel, Steven W.
1989-01-01
Steps in the development of intergenerational programs include the following: (1) needs assessment; (2) planning; (3) implementation; (4) assuring program longevity; and (5) establishing a national focus. Detailed description of such stages as facility and site procurement, recruitment, orientation, training, maintenance, and support is provided.…
Integrating Consumer Requests Into Community Organized Programs
ERIC Educational Resources Information Center
Brown, Sanford M.
1977-01-01
The environmental health administrative problem of reducing and/or eliminating individual complaints or requests by integrating them with the planned community environmental health program is discussed. Four parameters are detailed: problem assessment, priority establishment, activity sequencing and the evaluation of program effectiveness. (BT)
Program Activity/Training Plans. STIP II (Skill Training Improvement Programs Round II).
ERIC Educational Resources Information Center
Los Angeles Community Coll. District, CA.
Detailed operational guidelines, training objectives, and learning activities are provided for the Los Angeles Community College District's Skill Training Improvement Programs (STIP II), which are designed to train students for immediate employment. The first of four reports covers Los Angeles Southwest College's computer programming trainee…
Promoting public health through state cancer control plans: a review of capacity and sustainability.
Ory, Marcia G; Sanner, Brigid; Vollmer Dahlke, Deborah; Melvin, Cathy L
2015-01-01
The Centers for Disease Prevention and Control's National Comprehensive Cancer Control (CCC) Program oversee CCC programs designed to develop and implement CCC plans via CCC coalitions, alliances, or consortia of program stakeholders. We reviewed 40 up-to-date plans for states and the District of Columbia in order to assess how capacity building and sustainability, two evidence-based practices necessary for organizational readiness, positive growth, and maintenance are addressed. We employed an electronic key word search, supplemented by full text reviews of each plan to complete a content analysis of the CCC plans. Capacity is explicitly addressed in just over half of the plans (53%), generally from a conceptual point of view, with few specifics as to how capacity will be developed or enhanced. Roles and responsibilities, timelines for action, and measurements for evaluation of capacity building are infrequently mentioned. Almost all (92%) of the 40 up-to-date plans address sustainability on at least a cursory level, through efforts aimed at funding or seeking funding, policy initiatives, and/or partnership development. However, few details as to how these strategies will be implemented are found in the plans. We present the Texas plan as a case study offering detailed insight into how one plan incorporated capacity building and sustainability into its development and implementation. Training, technical assistance, templates, and tools may help CCC coalition members address capacity and sustainability in future planning efforts and assure the inclusion of capacity building and sustainability approaches in CCC plans at the state, tribal, territorial, and jurisdiction levels.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weisbin, C.R.; Barhen, J.; Hamel, W.R.
1987-01-01
A general framework is provided for more detailed planning on an annual basis, both for DOE and for other sponsoring organizations. The charter for the overall intelligent machine research effort is presented along with programmatic and technological goals. A research implementation plan is provided through the FY 1989 horizon.
Proposed Plan for Magnet Schools--Cleveland Public Schools. Section II, Health Careers Center.
ERIC Educational Resources Information Center
Fleming, Margaret, Ed.; And Others
A plan for a magnet school health careers program for 11th and 12th graders, intended to promote desegregation and provide improved educational opportunities for Cleveland students, is described in this proposal. Detailed descriptions cover staff requirements and qualifications, staff development plans, curriculum, and support activities. Included…
A Reliability Simulator for Radiation-Hard Microelectronics Development
1991-07-01
1 3.0 PHASE II WORK PLANS ................................................................ 2... plan . The correlation experimental details including the devices utilized, the hot-carrier stressing and the wafer-level radiation correlation procedure...channel devices, and a new lifetime extrapolation method is demonstrated for p-channel devices. 3.0 PHASE II WORK PLANS The Phase 1I program consisted of
Aeronautics Research and Technology Program and specific objectives, fiscal year 1982
NASA Technical Reports Server (NTRS)
Olstad, W. B.
1981-01-01
The Aeronautics Research and Technology program is broken down into two program areas (research and technology base, and systems technology programs) which are further broken down into succeedingly more detailed activities to form a work breakdown structure for the aeronautics program: program area, program/discipline objective, specific objective, and research and technology objective and plan (RTOP). A detailed view of this work breakdown structure down to the specific objective level is provided, and goals or objectives at each of these levels are set forth. What is to be accomplished and why are addressed, but not how. The letter falls within the domain of the RTOP.
NASA Technical Reports Server (NTRS)
Tartt, David M.; Hewett, Marle D.; Duke, Eugene L.; Cooper, James A.; Brumbaugh, Randal W.
1989-01-01
The Automated Flight Test Management System (ATMS) is being developed as part of the NASA Aircraft Automation Program. This program focuses on the application of interdisciplinary state-of-the-art technology in artificial intelligence, control theory, and systems methodology to problems of operating and flight testing high-performance aircraft. The development of a Flight Test Engineer's Workstation (FTEWS) is presented, with a detailed description of the system, technical details, and future planned developments. The goal of the FTEWS is to provide flight test engineers and project officers with an automated computer environment for planning, scheduling, and performing flight test programs. The FTEWS system is an outgrowth of the development of ATMS and is an implementation of a component of ATMS on SUN workstations.
Senior Citizens Can Be Physically Fit: Hints for a Successfully Developed Program.
ERIC Educational Resources Information Center
Sandlin, Betty; Sutherland, Mary S.
Suggestions are given in this paper for developing a physical fitness program for senior citizens. Discussed in detail are surveying community interest, program planning and implementation, and program evaluation. It is pointed out that fitness programs can modify many of the physical and mental changes of aging. It is emphasized that the program…
ERIC Educational Resources Information Center
Etheridge, Sandra Y.
This paper provides a description of the development of an honors program at Gulf Coast Community College (GCCC). The description is organized around three flow charts corresponding to different stages in the program's development, and which are followed by more detailed explanations. The first flow chart deals with program planning and…
A course in bicycle driver education
DOT National Transportation Integrated Search
1981-01-31
For each of the ten lessons in the program, this document includes a detailed lesson plan which a teacher can adapt to local needs as well as to his/her teaching method. Each lesson plan includes a listing of objectives, the necessary teacher prepara...
Child restraint workshop series. Volume 2, Ongoing and planned programs
DOT National Transportation Integrated Search
1979-09-01
This final report describes the planning and implementing details of the Child Restraint Workshop series. A child restraint workshop was conducted in each of the : ten NHTSA regions. The purpose of the workshops was to improve the effectiveness of gr...
NASA Technical Reports Server (NTRS)
1971-01-01
The design plan requirements define the design implementation and control requirements for Phase C/D of the Modular Space Station Project and specifically address the Initial Space Station phase of the Space Station Program (modular). It is based primarily on the specific objective of translating the requirements of the Space Station Program, Project, Interface, and Support Requirements and preliminary contract end x item specifications into detail design of the operational systems which comprise the initial space station. This document is designed to guide aerospace contractors in the planning and bidding for Phase C/D.
NASA: 1986 long-range program plan
NASA Technical Reports Server (NTRS)
1985-01-01
For the years beyond FY 1986, the plan consists of activities that are technologically possible and considered to be in the national interest. Its implementation will ensure logical and continued progress in reaching the Nation's goals in aeronautics and space, consistent with the responsibilities assigned NASA by the National Aeronautics and Space Act of 1958, as amended. The major features of the programs are described in detail and the nature of the aeronautics and space programs beyond the year 2000 are projected. The abbreviations and acronyms that appear in this report are listed. The status of NASA's plans are summarized at the time of its preparation.
Guidelines for Vocational Education Program in Nebraska Public Schools.
ERIC Educational Resources Information Center
Nebraska State Dept. of Education, Lincoln. Div. of Vocational Education.
The publication serves as a supplement to the Nebraska State plan of vocational education and outlines detailed directions that are needed for a more comprehensive treatment of program development and operational procedures. The report is structured in seven sections: (1) general provisions; (2) financial participation; (3) educational programs in…
Leveraging Sociocultural Theory to Create a Mentorship Program for Doctoral Students
ERIC Educational Resources Information Center
Crosslin, Matt; Wakefield, Jenny S.; Bennette, Phyllis; Black, James William, III
2013-01-01
This paper details a proposed doctoral student connections program that is based on sociocultural theory. It is designed to assist new students with starting their educational journey. This program is designed to leverage social interactions, peer mentorship, personal reflection, purposeful planning, and existing resources to assist students in…
NASA evolution of exploration architectures
NASA Technical Reports Server (NTRS)
Roberts, Barney B.
1991-01-01
A series of charts and diagrams is used to provide a detailed overview of the evolution of NASA space exploration architectures. The pre-Apollo programs including the Werner von Braun feasibility study are discussed and the evolution of the Apollo program itself is treated in detail. The post-Apollo era is reviewed and attention is given to the resurgence of strategic planning exemplified by both ad hoc and formal efforts at planning. Results of NASA's study of the main elements of the Space Exploration Initiative which examined technical scenarios, science opportunities, required technologies, international considerations, institutional strengths and needs, and resource estimates are presented. The 90-day study concludes that, among other things, major investments in challenging technologies are required, the scientific opportunities provided by the program are considerable, current launch capabilities are inadequate, and Space Station Freedom is essential.
The components of action planning and their associations with behavior and health outcomes.
Lorig, Kate; Laurent, Diana D; Plant, Kathryn; Krishnan, Eswar; Ritter, Philip L
2014-03-01
Based on the works of Kiesler and Bandura, action plans have become important tools in patient self-management programs. One such program, shown effective in randomized trials, is the Internet Chronic Disease Self-Management Program. An implementation of this program, Healthy Living Canada, included detailed information on action plans and health-related outcome measures. Action plans were coded by type, and associations between action plans, confidence in completion and completion were examined. Numbers of Action Plans attempted and competed and completion rates were calculated for participants and compared to six-month changes in outcomes using regression models. Five of seven outcome measures significantly improved at six-months. A total of 1136 action plans were posted by 254 participants in 12 workshops (mean 3.9 out of 5 possible); 59% of action plans involved exercise, 16% food, and 14% role management. Confidence of completion was associated with completion. Action plan completion measures were associated with improvements in activity limitation, aerobic exercise, and self-efficacy. Baseline self-efficacy was associated with at least partial completion of action plans. Action planning appears to be an important component of self-management interventions, with successful completion associated with improved health and self-efficacy outcomes.
ERIC Educational Resources Information Center
North Dakota State Board for Vocational Education, Bismarck.
This guidebook is designed to assist school administrators and teacher-coordinators in planning for cooperative occupational education programs. In addition, ideas and concepts are presented to assist other school personnel and laymen with the operational detail of vocational programs in cooperative occupational education. Major section titles…
Counter Trafficking System Development "Analysis Training Program"
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peterson, Dennis C.
This document will detail the training curriculum for the Counter-Trafficking System Development (CTSD) Analysis Modules and Lesson Plans are derived from the United States Military, Department of Energy doctrine and Lawrence Livermore National Laboratory (LLNL), Global Security (GS) S Program.
English Language and Skills Training for Entry-Level Health Care Jobs. Program Guide.
ERIC Educational Resources Information Center
Vaidya, Elma
The guide describes a vocational English-as-a-Second-Language program for pre-employment training of Southeast Asians seeking work in entry-level health care jobs. The program was conducted in cooperation with a hospital in Massachusetts. The guide describes the program and its four instructional units in detail, and includes lesson plans,…
Hall, Stacey A; Allen, Brandon L; Phillips, Dennis
2016-01-01
College athletic departments have a responsibility to provide a safe environment for student-athletes; however, most colleges do not have a crisis management plan that includes procedures for displaced student-athletes or alternate facilities to perform athletic events. Continuity of operations planning ensures athletic programs are equipped to maintain essential functions during, or shortly after, a disruption of operations due to possible hazards. Previous studies have identified a lack of emergency preparedness and continuity planning in college athletic departments. The purpose of this article is to illustrate in detail one approach to disaster planning for college athletic departments, namely the Federal Emergency Management Agency (FEMA) continuity of operations framework. By adhering to FEMA guidelines and promoting a best practices model, athletic programs can effectively plan to address potential hazards, as well as protect the organization's brand, image, and financial sustainability after a crisis event.
Advanced crew procedures development techniques: Procedures and performance program training plan
NASA Technical Reports Server (NTRS)
Arbet, J. D.; Benbow, R. L.
1975-01-01
A plan developed to support the training of PPP users in the operations associated with PPP usage is described. This document contains an overview of the contents of each training session and a detailed outline to be used as the guideline for each session.
Workshop by Design: Planning a Workshop.
ERIC Educational Resources Information Center
Spencer, Dorothy; Parsons, A. Chapman
In an Ohio Library Association guide for planning workshops, detailed instructions are given for forming a committee, holding meetings, selecting and paying the speaker, and developing the program. Budgets and fees are discussed along with information on federal funding. Practical guidance is also provided about equipment, table arrangements,…
NOSC Program Managers Handbook. Revision 1
1988-02-01
cost. The effects of application of life-cycle cost analysis through the planning and RIDT&E phases of a program, and the " design to cost" concept on...is the plan for assuring the quality of the design , design documentation, and fabricated/assembled hardware and associated computer software. 13.5.3.2...listings and printouts, which document the n. requirements, design , or details of compute : software; explain the capabilities and limitations of the
ERIC Educational Resources Information Center
Pennsylvania Association for Retarded Citizens, Harrisburg.
Presented is the PARC (Pennsylvania Association for Retarded Citizens) Plan which resulted from a 3-month survey of Pennsylvania's institutional system and which was designed to improve living conditions and programs of state schools and hospitals serving the mentally retarded. Detailed are specific recommendations for the achievement of annual…
76 FR 66286 - Notice of Final 2010 Effluent Guidelines Program Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-26
... Coalbed Methane Extraction (CBM) industry and will develop pretreatments requirements for discharges of...) industry. EPA is also issuing the detailed study report for the Coalbed Methane Extraction and the... Methane Point Source Category: Detailed Study Report, EPA-820-R-10-022, DCN 09999; Draft Guidance Document...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Coe, B.A.
1980-01-01
A district heating system for the Pagosa Springs central business district is in the planning stage. A detailed analysis of the project is presented. It comprises area and site specific studies and describes in detail the recent, current, anticipated, and postulated geothermal development activities. (MHR)
Intervention mapping: a process for developing theory- and evidence-based health education programs.
Bartholomew, L K; Parcel, G S; Kok, G
1998-10-01
The practice of health education involves three major program-planning activities: needs assessment, program development, and evaluation. Over the past 20 years, significant enhancements have been made to the conceptual base and practice of health education. Models that outline explicit procedures and detailed conceptualization of community assessment and evaluation have been developed. Other advancements include the application of theory to health education and promotion program development and implementation. However, there remains a need for more explicit specification of the processes by which one uses theory and empirical findings to develop interventions. This article presents the origins, purpose, and description of Intervention Mapping, a framework for health education intervention development. Intervention Mapping is composed of five steps: (1) creating a matrix of proximal program objectives, (2) selecting theory-based intervention methods and practical strategies, (3) designing and organizing a program, (4) specifying adoption and implementation plans, and (5) generating program evaluation plans.
Preparing for the Profession: The Accounting Job Search and Beyond
ERIC Educational Resources Information Center
Landgraf, Ellen L.; Stanko, Brian B.; Jinkerson, Darcia
2012-01-01
This paper provides a detailed description of a unique program focused on preparing students for entry into the accounting profession. The program, Preparing for the Profession, consisted of four distinct workshops provided to accounting majors during fall semester 2010. Planning for the program began a year earlier during a meeting of Accounting…
Appalachia: Goals, Objectives and Development Strategies
ERIC Educational Resources Information Center
Appalachian Regional Commission, Washington, DC.
Goals, objectives, and strategies for development in the 13 states involved in the Appalachian Regional Commission (ARC) are detailed in this document adopted by ARC in 1977. The regional development plan incorporates earlier evaluation and program design efforts, discussion from an issues report, state comments and development plans, and public…
DOT National Transportation Integrated Search
2018-03-01
The purpose of this report is to provide a refined evaluation plan detailing the approach to be used by the Texas A&M Transportation Institute Connected Vehicle Pilot Deployment Evaluation Team for evaluating the mobility, environmental, and public a...
Analytical Planning for University Libraries.
ERIC Educational Resources Information Center
Leimkuhler, Ferdinand F.; Cooper, Michael D.
A survey is made of the more important technological and managerial problems in the planning of university library services and recommendations are made for a positive program of innovation and development. Two approaches are explored in considerable detail. The first is the use of operations research models of the acquisition and storage…
NASA Technical Reports Server (NTRS)
Palguta, T.; Bradley, W.; Stockton, T.
1988-01-01
Guidance in preparing and updating an integrated logistics support plan (ILSP) is given. Clear, concise, and detailed instructions are provided on the preparation and content of an ILSP in order to ensure a quality document that reflects total program requirements.
AN EDUCATIONAL DEVELOPMENT PLAN FOR THE KAPIOLANI COMMUNITY COLLEGE--JANUARY 1967.
ERIC Educational Resources Information Center
NAKAMOTO, HARRIET; AND OTHERS
THIS REPORT OF THE COLLEGE'S EDUCATIONAL DEVELOPMENT PLAN COMMITTEE COVERS IN DETAIL PRESENT CURRICULUMS AND FACILITIES FOR COURSES IN BUSINESS EDUCATION, DENTAL ASSISTING, HOTEL AND RESTAURANT SERVICE, LANGUAGE ARTS, AND PRACTICAL NURSING, AS WELL AS THE PROPOSED DEVELOPMENT OF PROGRAMS FOR GENERAL EDUCATION, TRANSFER, OCCUPATIONAL AND CONTINUING…
Considerations Before Writing a Public Library Building Program in Children's Services.
ERIC Educational Resources Information Center
Hektoen, Faith
Designed to be useful for the assessment of existing collections and facilities as well as for planning new libraries, these guidelines detail specific needs, considerations and possibilities, and specifications for both materials and area planning. The materials section includes separate treatment for various types of books and other…
Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A) schedule plan
NASA Technical Reports Server (NTRS)
1994-01-01
This report describes Aerojet's methods and procedures used to control and administer contractual schedules for the EOS/AMSU-A program. Included are the following: the master, intermediate, and detail schedules; critical path analysis; and the total program logic network diagrams.
Charlotte Circle Outreach. Final Report.
ERIC Educational Resources Information Center
Calhoun, Mary Lynne; Rose, Terry L.; Prendergast, Donna
This final report details the activities of the Charlotte Circle Outreach, a program designed to provide technical assistance and training to early intervention programs offering services to infants and young children with substantial disabilities, ages birth through two years. This mission was accomplished through cooperative planning with…
Repository-based software engineering program: Concept document
NASA Technical Reports Server (NTRS)
1992-01-01
This document provides the context for Repository-Based Software Engineering's (RBSE's) evolving functional and operational product requirements, and it is the parent document for development of detailed technical and management plans. When furnished, requirements documents will serve as the governing RBSE product specification. The RBSE Program Management Plan will define resources, schedules, and technical and organizational approaches to fulfilling the goals and objectives of this concept. The purpose of this document is to provide a concise overview of RBSE, describe the rationale for the RBSE Program, and define a clear, common vision for RBSE team members and customers. The document also provides the foundation for developing RBSE user and system requirements and a corresponding Program Management Plan. The concept is used to express the program mission to RBSE users and managers and to provide an exhibit for community review.
Sandia National Laboratories California Waste Management Program Annual Report February 2008.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brynildson, Mark E.
The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.
NASA Technical Reports Server (NTRS)
Young, L. A.; Aiken, E. W.; Gulick, V.; Mancinelli, R.; Briggs, G. A.; Rutkowski, Michael (Technical Monitor)
2002-01-01
A new approach for the robotic exploration of Mars is detailed in this paper: the use of small, ultralightweight, autonomous rotary-wing aerial platforms. Missions based on robotic rotorcraft could make excellent candidates for NASA Mars Scout program. The paper details the work to date and future planning required for the development of such 'Mars rotorcraft.'
Contextualized IT Education in Tanzania: Beyond Standard IT Curricula
ERIC Educational Resources Information Center
Tedre, Matti; Bangu, Nicholas; Nyagava, Seth I.
2009-01-01
Tumaini University at Iringa, Tanzania, started a new B.Sc. program in IT in 2007. In the course of planning and implementation of the program, we found out that standard ACM/IEEE IT curricula are not adequate for an IT program in a poor, developing country. The standard curricula describe, in detail, the competences that IT specialists in…
Hatching Plans: Pedagogy and Discourse within an El Sistema-Inspired Music Program
ERIC Educational Resources Information Center
Dobson, Nicolas
2016-01-01
In this article, I draw on my experience as an instrumental tutor with a music program inspired by and explicitly linked to El Sistema, to explore new perspectives on Sistema-based pedagogy and management. Detailed ethnographic description of an orchestral session provides a first-hand account of the program's pedagogy, which I then contextualize…
Terrestrial ecosystems: national inventory of vegetation and land use
Gergely, Kevin J.; McKerrow, Alexa
2013-11-12
The Gap Analysis Program (GAP)/Landscape Fire and Resource Management Planning Tools (LANDFIRE) National Terrestrial Ecosystems Data represents detailed data on the vegetation and land-use patterns of the United States, including Alaska, Hawaii, and Puerto Rico. This national dataset combines detailed land cover data generated by the GAP with LANDFIRE data (http://www.landfire.gov/). LANDFIRE is an interagency vegetation, fire, and fuel characteristics mapping program sponsored by the U.S. Department of the Interior (DOI) and the U.S. Department of Agriculture Forest Service.
Mars extant-life campaign using an approach based on Earth-analog habitats
NASA Technical Reports Server (NTRS)
Palkovic, Lawrence A.; Wilson, Thomas J.
2005-01-01
The Mars Robotic Outpost group at JPL has identified sixteen potential momentous discoveries that if found on Mars would alter planning for the future Mars exploration program. This paper details one possible approach to the discovery of and response to the 'momentous discovery'' of extant life on Mars. The approach detailed in this paper, the Mars Extant-Life (MEL) campaign, is a comprehensive and flexible program to find living organisms on Mars by studying Earth-analog habitats of extremophile communities.
Battery Test Manual For 48 Volt Mild Hybrid Electric Vehicles
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walker, Lee Kenneth
2017-03-01
This manual details the U.S. Advanced Battery Consortium and U.S. Department of Energy Vehicle Technologies Program goals, test methods, and analysis techniques for a 48 Volt Mild Hybrid Electric Vehicle system. The test methods are outlined stating with characterization tests, followed by life tests. The final section details standardized analysis techniques for 48 V systems that allow for the comparison of different programs that use this manual. An example test plan is included, along with guidance to filling in gap table numbers.
Accountability for School Counseling Programs.
ERIC Educational Resources Information Center
Baker, Stanley B.
This paper suggests ways in which counselors can take greater control of their accountability plans and make evaluations serve both the counselor and the school more constructively. Recommended competencies for specific types of guidance programs are described in detail. Three types of evaluation data are discussed for use in accountability…
NASA Earth Science Update with Information Science Technology
NASA Technical Reports Server (NTRS)
Halem, Milton
2000-01-01
This viewgraph presentation gives an overview of NASA earth science updates with information science technology. Details are given on NASA/Earth Science Enterprise (ESE)/Goddard Space Flight Center strategic plans, ESE missions and flight programs, roles of information science, ESE goals related to the Minority University-Space Interdisciplinary Network, and future plans.
A Four-Stage Model for Planning Computer-Based Instruction.
ERIC Educational Resources Information Center
Morrison, Gary R.; Ross, Steven M.
1988-01-01
Describes a flexible planning process for developing computer based instruction (CBI) in which the CBI design is implemented on paper between the lesson design and the program production. A four-stage model is explained, including (1) an initial flowchart, (2) storyboards, (3) a detailed flowchart, and (4) an evaluation. (16 references)…
Web Application Software for Ground Operations Planning Database (GOPDb) Management
NASA Technical Reports Server (NTRS)
Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey
2013-01-01
A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.
Integrated Technology Plan for the Civil Space Program, 1991
NASA Technical Reports Server (NTRS)
1991-01-01
The purpose of the Integrated Technology Plan (ITP) is to serve as a strategic plan for the OAST space research and technology (R&T) program, and as a strategic planning framework for other NASA and national participants in advocating and conducting technology developments that support future U.S. civil space missions. The ITP begins with a discussion of the national policy and NASA organization which establishes the overall framework for civil space R&T planning. The second chapter provides a top-level review of the potential users of civil space R&T, their strategic mission plans, and the technologies they have identified as needed to achieve those plans. The overall methodology used to develop a civil space technology strategy is discussed. The technical details of the 1991 strategic plan are described, ending with a review of civil space R&T priorities. The fourth chapter describes how the strategic plan is annually translated into the OAST Space R&T Program, with a summary of the fiscal year 1992 program. The ITP concludes with a discussion of requirements for technology development coordination and strategies for facilitating the transfer of civil space technology to the private sector. Several appendices also are attached that provide further information regarding budget implications of the strategic plan, organizational roles, and other topics.
Some guidance on preparing validation plans for the DART Full System Models.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gray, Genetha Anne; Hough, Patricia Diane; Hills, Richard Guy
2009-03-01
Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generallymore » applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan will vary according to application requirements and available resources.« less
Research on the Hotel Image Based on the Detail Service
NASA Astrophysics Data System (ADS)
Li, Ban; Shenghua, Zheng; He, Yi
Detail service management, initially developed as marketing programs to enhance customer loyalty, has now become an important part of customer relation strategy. This paper analyzes the critical factors of detail service and its influence on the hotel image. We establish the theoretical model of influencing factors on hotel image and propose corresponding hypotheses. We use applying statistical method to test and verify the above-mentioned hypotheses. This paper provides a foundation for further study of detail service design and planning issues.
Ames Research Center FY 2000 Implementation Plan: Leading Technology into the New Millennium
NASA Technical Reports Server (NTRS)
2000-01-01
This document presents the implementation plan for Ames Research Center (ARC) within the overall framework of the NASA Strategic Plan. It describes how ARC intends to implement its Center of Excellence responsibilities, Agency assigned missions, Agency and Enterprise lead programs, and other roles in support of NASA's vision and mission. All Federal agencies are required by the 1993 Government Performance and Results Act to implement a long-term strategic planning process that includes measurable outcomes and strict accountability. At NASA, this planning process is shaped by the Space Act of 1958, annual appropriations, and other external mandates, as well as by customer requirements. The resulting Strategic Plan sets the overall architecture for what we do, identifies who our customers are, and directs where we are going and why. The Strategic Plan is the basis upon which decisions regarding program implementation and resource deployment are made. Whereas the strategic planning process examines the long-term direction of the organization and identifies a specific set of goals, the implementation planning process examines the detailed performance of the organization and allocates resources toward meeting these goals. It is the purpose of this implementation document to provide the connection between the NASA Strategic Plan and the specific programs and support functions that ARC employees perform. This connection flows from the NASA Strategic Plan, through the various Strategic Enterprise plans to the ARC Center of Excellence, primary missions, Lead Center programs, program support responsibilities, and ultimately, to the role of the individual ARC employee.
A cost-benefit analysis of the Mexican Social Security Administration's family planning program.
Nortman, D L; Halvas, J; Rabago, A
1986-01-01
A cost-benefit analysis of the family planning program of the Mexican Social Security System (IMSS) was undertaken to test the hypothesis that IMSS's family planning services yield a net savings to IMSS by reducing the load on its maternal and infant care service. The cost data are believed to be of exceptionally high quality because they were empirically ascertained by a retrospective and prospective survey of unit time and personnel costs per specified detailed type of service in 37 IMSS hospitals and 16 clinics in 13 of Mexico's 32 states. Based on the average cost per case, the analysis disclosed that for every peso (constant 1983 currency) that IMSS spent on family planning services to its urban population during 1972-1984 inclusive, the agency saved nine pesos. The article concludes by raising the speculative question as to the proportion of the births averted by the IMSS family planning program that would have been averted in the absence of IMSS's family planning services.
ERIC Educational Resources Information Center
Goldman, Charles I.
The manual is part of a series to assist in planning procedures for local and State vocational agencies. It details steps required to process a local education agency's data after the data have been coded onto keypunch forms. Program, course, and overhead data are input into a computer data base and error checks are performed. A computer model is…
Sex, Kids, and Politics. Health Services in Schools.
ERIC Educational Resources Information Center
Emihovich, Catherine; Herrington, Carolyn D.
This book examines practical, cultural, and political implications of placing health service programs in public schools, detailing three cases of Florida school districts, where a controversial statewide initiative for health services in schools recently went into effect. The plan supports programs to promote the health of medically underserved…
Educational Planning for Utilization of Space Shuttle (ED-PLUSS). Final Research Report.
ERIC Educational Resources Information Center
Engle, Harry A.; Christensen, David L.
Possible educational uses of the proposed space-shuttle program of the National Aeronautics and Space Administration are outlined. Potential users of information developed by the project are identified and their characteristics analyzed. Other space-education programs operated by NASA are detailed. Proposals for a methodology for expanding…
ERIC Educational Resources Information Center
Howard, E. Marguerite, Ed.
A guide to summer study abroad is presented with information on how to plan rewarding summer study and travel overseas. Concise descriptions of over 1300 postsecondary study programs worldwide (in over 65 countries) sponsored by U.S. and foreign universities and institutions are included with details on program sponsor and name, location, dates,…
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-09-01
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
The 1993/1994 NASA Graduate Student Researchers Program
NASA Technical Reports Server (NTRS)
1992-01-01
The NASA Graduate Student Researchers Program (GSRP) attempts to reach a culturally diverse group of promising U.S. graduate students whose research interests are compatible with NASA's programs in space science and aerospace technology. Each year we select approximately 100 new awardees based on competitive evaluation of their academic qualifications, their proposed research plan and/or plan of study, and their planned utilization of NASA research facilities. Fellowships of up to $22,000 are awarded for one year and are renewable, based on satisfactory progress, for a total of three years. Approximately 300 graduate students are, thus, supported by this program at any one time. Students may apply any time during their graduate career or prior to receiving their baccalaureate degree. An applicant must be sponsored by his/her graduate department chair or faculty advisor; this book discusses the GSRP in great detail.
Science and Technology for a Safer Nation
2008-03-01
facilities. “Harvesting Innovation” gathers detailed information about efforts supporting Laboratory-Directed Research and Development ( LDRD ...programs and shares this with DHS directors, division heads and program managers. Energy Department labs allocate some $400 million per year in LDRD ...correlate LDRD projects with DHS S&T strategic goals and ongoing programs as well as planned projects in all six S&T divisions. This minimizes
ERIC Educational Resources Information Center
Poon, Derek
Covering the period January 1 through June 30, 1975, this second semi-annual report on the Applied Fishery Science Program operative at Sheldon Jackson College in Sitka, Alaska presents information regarding program progress and Alaska Native students involved in science education. Specifically, this report details: Planning and Coordination…
A stump-to-mill timber production cost-estimating program for cable logging eastern hardwoods
Chris B. LeDoux
1987-01-01
ECOST utilizes data from stand inventory, cruise data, and the logging plan for the tract in question. The program produces detailed stump-to-mill cost estimates for specific proposed timber sales. These estimates are then utilized, in combination with specific landowner objectives, to assess the economic feasibility of cable logging a given area. The program output is...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1982-04-01
The ORNL Fossil Energy Materials Program Office compiles and issues this combined quarterly progress report from camera-ready copies submitted by each of the participating subcontractor organizations. This report of activities on the program is organized in accordance with a work breakdown structure defined in the AR and TD Fossil Energy Materials Program Plan for FY 1982-1986 in which projects are organized according to fossil energy technologies. This report is divided into parts and chapters with each part describing projects related to a particular fossil energy technology. Chapters within a part provide details of the various projects associated with that technology.more » We hope this series of AR and TD Fossil Energy Materials Program quarterly progress reports will aid in the dissemination of information developed on the program. Plans for the program will be issued annually. A draft of the program plan for FY 1982 to 1986 has been prepared and is in the review process. The implementation of these plans will be reflected by these quarterly progress reports, and this dissemination of information will bw augmented by topical or final reports as appropriate.« less
Detailed Maintenance Planning for Military Systems with Random Lead Times and Cannibalization
2014-12-01
relativement aux systèmes d’entretien. Prendre les meilleures décisions possible signifie ici de trouver un équilibre entre les coûts d’exploitation et la...Multistage Stochastic Programming: A Scenario Tree Based Approach to Planning under Uncertainty, In Sucar, L. E., Morales , E. F., and Hoey, J
Implementation of Head Start Planned Variation: 1970-1971. Part II.
ERIC Educational Resources Information Center
Lukas, Carol Van Deusen; Wohlleb, Cynthia
This volume of appendices is Part II of a study of program implementation in 12 models of Head Start Planned Variation. It presents details of the data analysis, copies of data collection instruments, and additional analyses and statistics. The appendices are: (A) Analysis of Variance Designs, (B) Copies of Instruments, (C) Additional Analyses,…
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.; McNair, Ann R. (Technical Monitor)
2002-01-01
The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.
2002-01-01
The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.
ERIC Educational Resources Information Center
North Carolina State Dept. of Commerce, Raleigh. Energy Div.
State guidelines for grant applications that follow the regulations of the National Energy Conservation Policy Act of 1978 are presented for North Carolina institutions. Among the 17 procedures spelled out in detail are several that concern eligible institutions' involvement in the development of the state plan, notification of the plan, and…
Computer-Generated Movies for Mission Planning
NASA Technical Reports Server (NTRS)
Roberts, P. H., Jr.; vanDillen, S. L.
1973-01-01
Computer-generated movies help the viewer to understand mission dynamics and get quantitative details. Sample movie frames demonstrate the uses and effectiveness of movies in mission planning. Tools needed for movie-making include computer programs to generate images on film and film processing to give the desired result. Planning scenes to make an effective product requires some thought and experience. Viewpoints and timing are particularly important. Lessons learned so far and problems still encountered are discussed.
Twelve Steps in Developing a Schoolsite Health Education/Promotion Program for Faculty and Staff.
ERIC Educational Resources Information Center
McKenzie, James F.
1988-01-01
School districts may benefit by establishing health education/ promotion programs for its employees. Twelve steps in doing so are presented. Health benefits will accrue to employees while employers'"bottom line" will be reduced by their investment in employees' health. Detailed planning steps are outlined. (Author/JL)
Space industrialization. Volume 3: Space industrialization implementation concepts
NASA Technical Reports Server (NTRS)
1978-01-01
Methods for selecting the most viable program options were examined along with techniques for hardware development. Several separate program options were defined, and future plans for space exploitation were reviewed. Hardware elements in various sectors of space are discussed in detail to provide a definition for the major functional elements and operations.
Annual Report of the Oklahoma State Advisory Council Vocational-Technical Education (Fourth).
ERIC Educational Resources Information Center
Oklahoma State Advisory Council for Vocational-Technical Education, Oklahoma City.
The fourth annual report of the Oklahoma Advisory Council for Vocational-Technical Education presents detailed evaluative comments on programs carried out under the Oklahoma State Plan for Vocational Education for the academic year 1971-72. Following last year's recommendations, health occupations programs continued to have first priority. A…
ERIC Educational Resources Information Center
ENDWRIGHT, D.K.
THE SUGGESTED APPROACH TO PROVIDING ADEQUATE ACADEMIC AND VOCATIONAL TRAINING PROGRAMS FOR PRISON INMATES EMPHASIZES ACCREDITATION OF VOCATIONAL, TECHNICAL, AND ADULT EDUCATION CENTERS AS THE ULTIMATE GOAL. THE PURPOSE, OBJECTIVES, NEEDS, AND PRESENT EDUCATIONAL PROGRAMS OF SEVEN FLORIDA INSTITUTIONS ARE OUTLINED IN DETAIL. COLLEGE AND DALE…
FY 2016 Annual Performance Report
Presents detailed performance results, as measured against the targets established in EPA’s FY 2016 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2016 program evaluations.
FY 2017 Annual Performance Report (APR)
Presents detailed performance results, as measured against the targets established in EPA’s FY 2017 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2017 program evaluations.
DOT National Transportation Integrated Search
2000-02-01
This document is the applicant's guide for proposing intelligent transportation systems projects to Transport Canada and details such matters as eligibility, Transport Canada's program objectives and assessment of projects
FY 2015 Annual Performance Report
Presents detailed performance results, as measured against the targets established in EPA’s FY 2015 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2015 program evaluations.
Chemical and biological nonproliferation program. FY99 annual report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
2000-03-01
This document is the first of what will become an annual report documenting the progress made by the Chemical and Biological Nonproliferation Program (CBNP). It is intended to be a summary of the program's activities that will be of interest to both policy and technical audiences. This report and the annual CBNP Summer Review Meeting are important vehicles for communication with the broader chemical and biological defense and nonproliferation communities. The Chemical and Biological Nonproliferation Program Strategic Plan is also available and provides additional detail on the program's context and goals. The body of the report consists of an overviewmore » of the program's philosophy, goals and recent progress in the major program areas. In addition, an appendix is provided with more detailed project summaries that will be of interest to the technical community.« less
NASA Astrophysics Data System (ADS)
Arevalo, S.; Atwood, C.; Bell, P.; Blacker, T. D.; Dey, S.; Fisher, D.; Fisher, D. A.; Genalis, P.; Gorski, J.; Harris, A.; Hill, K.; Hurwitz, M.; Kendall, R. P.; Meakin, R. L.; Morton, S.; Moyer, E. T.; Post, D. E.; Strawn, R.; Veldhuizen, D. v.; Votta, L. G.; Wynn, S.; Zelinski, G.
2008-07-01
In FY2008, the U.S. Department of Defense (DoD) initiated the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program, a 360M program with a two-year planning phase and a ten-year execution phase. CREATE will develop and deploy three computational engineering tool sets for DoD acquisition programs to use to design aircraft, ships and radio-frequency antennas. The planning and execution of CREATE are based on the 'lessons learned' from case studies of large-scale computational science and engineering projects. The case studies stress the importance of a stable, close-knit development team; a focus on customer needs and requirements; verification and validation; flexible and agile planning, management, and development processes; risk management; realistic schedules and resource levels; balanced short- and long-term goals and deliverables; and stable, long-term support by the program sponsor. Since it began in FY2008, the CREATE program has built a team and project structure, developed requirements and begun validating them, identified candidate products, established initial connections with the acquisition programs, begun detailed project planning and development, and generated the initial collaboration infrastructure necessary for success by its multi-institutional, multidisciplinary teams.
ATF Neutron Irradiation Program Technical Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Geringer, J. W.; Katoh, Yutai
The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization ofmore » irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.« less
The NASA Scientific and Technical Information Program: Prologue to the Future
NASA Technical Reports Server (NTRS)
1991-01-01
The NASA STI Program offers researchers an infrastructure of people and systems that facilitates access to STI; worldwide. The Program is also NASA's institutional mechanism for disseminating the results of its research and developing activities. Through discussions in 1991, the STI Program formulated its Strategic Plan. The plan gives the Program a renewed sense of direction by focusing on future opportunities, customer requirements and Program goals, along with the changes needed to achieve those goals. The Program provides users access to a massive flow of STI which, in fact, represents the largest collection of aeronautical and space science information in the world. The STI Program products and services are outlined, along with the NASA centers, international operations, and the fact that total quality management drives NASA wide program developments. As is detailed, the NASA STI Program is using its resources as effectively as possible to meet the missing needs of NASA.
ERIC Educational Resources Information Center
Burdette, Rebecca; Galeucia, Annemarie; Liggett, Sarah; Thompson, Melissa
2016-01-01
This article provides background on Louisiana State University's Communication across the Curriculum (CxC) program and details the history and logistics of its experiential learning and community outreach event--TEDxLSU. In particular, the authors provide details on the Student Creative Communications Team (SCCT) which conceptualizes, plans, and…
A stump-to-truck cost estimating program for cable logging young-growth Douglas-fir
Chris B. LeDoux
1989-01-01
WCOST is a computer program designed to estimate the stump-to-truck logging cost of cable logging young-growth Douglas-fir. The program uses data from stand inventory, cruise data, and the logging plan for the tract in question to produce detailed stump-to-truck cost estimates for specific proposed timber sales. These estimates are then used, in combination with...
Solar System Exploration Division Strategic Plan, volume 1. Executive summary and overview
NASA Technical Reports Server (NTRS)
1991-01-01
This first document is the first of a six-volume series presenting the Solar System Exploration Division's Strategic Plan for the 10-year period FY 1994 to FY 2003. The overall strategy is characterized by five fundamental precepts: (1) execute the current program; (2) improve the vitality of the program and the planetary science community; (3) initiate innovative, small, low-cost planetary missions; (4) initiate new major and moderate missions; and (5) prepare for the next generation of missions. This Strategic Plan describes in detail our proposed approach to accomplish these goals. Volume 1 provides first an Executive Summary of highlights of each of the six volumes, and then goes on to present an overview of the plan, including a discussion of the planning context and strategic approach. Volumes 2, 3, 4, and 5 describe in detail the initiatives proposed. An integral part of each of these volumes is a set of responses to the mission selection criteria questions developed by the Space and Earth Science Advisory Committee. Volume 2, Mission From Planet Earth, describes a strategy for exploring the Moon and Mars and sets forth proposed moderate missions--Lunar Observer and a Mars lander network. Volume 3, Pluto Flyby/Neptune Orbiter, discusses our proposed major new start candidate for the FY 1994 to FY 1998 time frame. Volume 4, Discovery, describes the Near-Earth Asteroid Rendezvous, as well as other candidates for this program of low-cost planetary missions. Volume 5, Toward Other Planetary Systems, describes a major research and analysis augmentation that focuses on extrasolar planet detection and the study of planetary system processes. Finally, Volume 6 summarizes the technology program that the division has structured around these four initiatives.
Final Work Plan: Targeted Investigation at York, Nebraska
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, Lorraine M.
The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan,more » the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.« less
Evaluation of scheduling techniques for payload activity planning
NASA Technical Reports Server (NTRS)
Bullington, Stanley F.
1991-01-01
Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.
Early Identification of SE-Related Program Risks
2009-09-30
development of feasibility evidence for a 100-KSLOC project . It is good to note that the “sweet spots” are... models , or experiments with planned technologies and increasingly detailed analysis of development approaches and project productivity rates. The ...incomplete without the FED, it becomes a first-class project deliverable. This implies that it needs a plan for its development , and that each task
Designing Services and Programs for High-Ability Learners. A Guidebook for Gifted Education
ERIC Educational Resources Information Center
Purcell, Jeanne H., Ed.; Eckert, Rebecca D., Ed.
2005-01-01
This book will help the reader every step of the way with detailed guidelines, practical tips, templates, action plans, and suggestions for strategic planning teams as well as for the sole practitioner. Consolidating the sage advice and up-to-date research of 29 leaders in the field, this comprehensive and highly practical guide takes the…
SU-F-T-94: Plan2pdf - a Software Tool for Automatic Plan Report for Philips Pinnacle TPS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wu, C
Purpose: To implement an automatic electronic PDF plan reporting tool for Philips Pinnacle treatment planning system (TPS) Methods: An electronic treatment plan reporting software is developed by us to enable fully automatic PDF report from Pinnacle TPS to external EMR programs such as MOSAIQ. The tool is named “plan2pdf”. plan2pdf is implemented using Pinnacle scripts, Java and UNIX shell scripts, without any external program needed. plan2pdf supports full auto-mode and manual mode reporting. In full auto-mode, with a single mouse click, plan2pdf will generate a detailed Pinnacle plan report in PDF format, which includes customizable cover page, Pinnacle plan summary,more » orthogonal views through each plan POI and maximum dose point, DRR for each beam, serial transverse views captured throughout the dose grid at a user specified interval, DVH and scorecard windows. The final PDF report is also automatically bookmarked for each section above for convenient plan review. The final PDF report can either be saved on a user specified folder on Pinnacle, or it can be automatically exported to an EMR import folder via a user configured FTP service. In manual capture mode, plan2pdf allows users to capture any Pinnacle plan by full screen, individual window or rectangular ROI drawn on screen. Furthermore, to avoid possible patients’ plan mix-up during auto-mode reporting, a user conflict check feature is included in plan2pdf: it prompts user to wait if another patient is being exported by plan2pdf by another user. Results: plan2pdf is tested extensively and successfully at our institution consists of 5 centers, 15 dosimetrists and 10 physicists, running Pinnacle version 9.10 on Enterprise servers. Conclusion: plan2pdf provides a highly efficient, user friendly and clinical proven platform for all Philips Pinnacle users, to generate a detailed plan report in PDF format for external EMR systems.« less
Health plans keeping drug cost increases in check with programs that promote generics.
2002-07-01
To counter the massive amount of drug company detailing and marketing that is partly responsible for driving up pharmaceutical costs, health plans and some independent practice associations are promoting the use of generics to physicians in their networks. While most physicians in capitated contracts don't directly benefit from the movement to encourage generics unless they have pharmacy risk, some health plans are paying physicians financial incentives to increase generic prescribing.
Cerescope: Algeria Seeks Better Training in Agriculture.
ERIC Educational Resources Information Center
Ceres, 1979
1979-01-01
Recent changes and developments in Algeria's agricultural education program to meet the future needs for expertise at all levels in the rural sector are described. Training targets established in the national plan are detailed. (BT)
CMIF ECLS system test findings
NASA Technical Reports Server (NTRS)
Schunk, Richard G.; Carrasquillo, Robyn L.; Ogle, Kathyrn Y.; Wieland, Paul O.; Bagdigian, Robert M.
1989-01-01
During 1987 three Space Station integrated Environmental Control and Life Support System (ECLSS) tests were conducted at the Marshall Space Flight Center (MSFC) Core Module Integration Facility (CMIF) as part of the MSFC ECLSS Phase II test program. The three tests ranged in duration from 50 to 150 hours and were conducted inside of the CMIF module simulator. The Phase II partial integrated system test configuration consisted of four regenerative air revitalization subsystems and one regenerative water reclamation subsystem. This paper contains a discussion of results and lessons learned from the Phase II test program. The design of the Phase II test configuration and improvements made throughout the program are detailed. Future plans for the MSFC CMIF test program are provided, including an overview of planned improvements for the Phase III program.
Parsing Protocols Using Problem Solving Grammars. AI Memo 385.
ERIC Educational Resources Information Center
Miller, Mark L.; Goldstein, Ira P.
A theory of the planning and debugging of computer programs is formalized as a context free grammar, which is used to reveal the constituent structure of problem solving episodes by parsing protocols in which programs are written, tested, and debugged. This is illustrated by the detailed analysis of an actual session with a beginning student…
Employer Child Care Resources: A Guide to Developing Effective Child Care Programs and Policies.
ERIC Educational Resources Information Center
Women's Bureau (DOL), Washington, DC.
Increasing numbers of employers are responding to employee child care needs by revising their benefit packages, work schedules, and recruitment plans to include child care options. This guide details ways to develop effective child care programs and policies. Section 1 of the guide describes employees' growing child care needs and employers'…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Fivemore » priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs.« less
ERIC Educational Resources Information Center
Bentley, Kia J.
2013-01-01
This article presents a framework for evaluation in social work doctoral education and details 10 years of successes and challenges in one PhD program's use of the framework, including planning and implementing specific assessment activities around student learning outcomes and larger program goals. The article argues that a range of…
Risk Management for Human Support Technology Development
NASA Technical Reports Server (NTRS)
jones, Harry
2005-01-01
NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER WM) operations at DOE sites to be safer,more » faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs.« less
Issues and Potential Program on Denatured Fuel Utilization.
1978-12-01
HTGR fuel develop - ment program ; 4. coated particles of (U,Th)02 have been extensively tested as potential HTGR fuels . A detailed summary of the...current scrap and waste treatment requirements. dBase case for all HTGR (Prismatic Fuel Element) cases based on data in "Summary Program Plan...Alternate Program for HTGR Fuel Recycle," April 11, 1975, Draft. 19 a --- AC8NCi09 The principal factors that result in a nominally-higher cost for
NASA Technical Reports Server (NTRS)
1979-01-01
The detailed logic flow for the Flight Design System Executive is presented. The system is designed to provide the hardware/software capability required for operational support of shuttle flight planning.
An Intelligent Crop Planning Tool for Controlled Ecological Life Support Systems
NASA Technical Reports Server (NTRS)
Whitaker, Laura O.; Leon, Jorge
1996-01-01
This paper describes a crop planning tool developed for the Controlled Ecological Life Support Systems (CELSS) project which is in the research phases at various NASA facilities. The Crop Planning Tool was developed to assist in the understanding of the long term applications of a CELSS environment. The tool consists of a crop schedule generator as well as a crop schedule simulator. The importance of crop planning tools such as the one developed is discussed. The simulator is outlined in detail while the schedule generator is touched upon briefly. The simulator consists of data inputs, plant and human models, and various other CELSS activity models such as food consumption and waste regeneration. The program inputs such as crew data and crop states are discussed. References are included for all nominal parameters used. Activities including harvesting, planting, plant respiration, and human respiration are discussed using mathematical models. Plans provided to the simulator by the plan generator are evaluated for their 'fitness' to the CELSS environment with an objective function based upon daily reservoir levels. Sample runs of the Crop Planning Tool and future needs for the tool are detailed.
The Gaia-ESO Survey Astrophysical Calibration
NASA Astrophysics Data System (ADS)
Pancino, E.; Gaia-ESO Survey Consortium
2016-05-01
The Gaia-ESO Survey is a wide field spectroscopic survey recently started with the FLAMES@VLT in Cerro Paranal, Chile. It will produce radial velocities more accurate than Gaia's for faint stars (down to V ≃ 18), and astrophysical parameters and abundances for approximately 100 000 stars, belonging to all Galactic populations. 300 nights were assigned in 5 years (with the last year subject to approval after a detailed report). In particular, to connect with other ongoing and planned spectroscopic surveys, a detailed calibration program — for the astrophysical parameters derivation — is planned, including well known clusters, Gaia benchmark stars, and special equatorial calibration fields designed for wide field/multifiber spectrographs.
Space Shuttle wind tunnel testing program
NASA Technical Reports Server (NTRS)
Whitnah, A. M.; Hillje, E. R.
1984-01-01
A major phase of the Space Shuttle Vehicle (SSV) Development Program was the acquisition of data through the space shuttle wind tunnel testing program. It became obvious that the large number of configuration/environment combinations would necessitate an extremely large wind tunnel testing program. To make the most efficient use of available test facilities and to assist the prime contractor for orbiter design and space shuttle vehicle integration, a unique management plan was devised for the design and development phase. The space shuttle program is reviewed together with the evolutional development of the shuttle configuration. The wind tunnel testing rationale and the associated test program management plan and its overall results is reviewed. Information is given for the various facilities and models used within this program. A unique posttest documentation procedure and a summary of the types of test per disciplines, per facility, and per model are presented with detailed listing of the posttest documentation.
Network Speech Systems Technology Program
NASA Astrophysics Data System (ADS)
Weinstein, C. J.
1980-09-01
This report documents work performed during FY 1980 on the DCA-sponsored Network Speech Systems Technology Program. The areas of work reported are: (1) communication systems studies in Demand-Assignment Multiple Access (DAMA), voice/data integration, and adaptive routing, in support of the evolving Defense Communications System (DCS) and Defense Switched Network (DSN); (2) a satellite/terrestrial integration design study including the functional design of voice and data interfaces to interconnect terrestrial and satellite network subsystems; and (3) voice-conferencing efforts dealing with support of the Secure Voice and Graphics Conferencing (SVGC) Test and Evaluation Program. Progress in definition and planning of experiments for the Experimental Integrated Switched Network (EISN) is detailed separately in an FY 80 Experiment Plan Supplement.
Halogen occultation experiment intergrated test plan
NASA Technical Reports Server (NTRS)
Mauldin, L. E., III; Butterfield, A. J.
1986-01-01
The test program plan is presented for the Halogen Occultation Experiment (HALOE) instrument, which is being developed in-house at the Langley Research Center for the Upper Atmosphere Research Satellite (UARS). This comprehensive test program was developed to demonstrate that the HALOE instrument meets its performance requirements and maintains integrity through UARS flight environments. Each component, subsystem, and system level test is described in sufficient detail to allow development of the necessary test setups and test procedures. Additionally, the management system for implementing this test program is given. The HALOE instrument is a gas correlation radiometer that measures vertical distribution of eight upper atmospheric constituents: O3, HC1, HF, NO, CH4, H2O, NO2, and CO2.
Technology in education: A guidebook for developing a science and math education support program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wagner, C.L.
1992-09-01
Education is vital to survival and success in an increasingly technical world, and the quality of education is the responsibility of everyone students, teachers, parents, industry, and government. Any technical organization wanting to contribute to that success through its local education system can do so easily and effectively through careful planning. This report details that planning process and includes methods to (1) identify the interests, strengths, and resources of the technical organization; (2) identify the needs of the local education system; (3) interface with local school system administration, principals, and teachers; and (4) develop a unique plan to match themore » organization's strengths and resources with the needs of the school system. Following these getting started'' activities is the actual program that the Engineering Technology Division implemented in a local elementary school, including the curriculum, topics, and actual lesson plans used by technical personnel in the classroom. Finally, there are enrichment activities for teachers and students, suggestions for measuring the success of an education support program, and an overview of student responses to questions about the overall program.« less
Technology in education: A guidebook for developing a science and math education support program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wagner, C.L.
1992-09-01
Education is vital to survival and success in an increasingly technical world, and the quality of education is the responsibility of everyone students, teachers, parents, industry, and government. Any technical organization wanting to contribute to that success through its local education system can do so easily and effectively through careful planning. This report details that planning process and includes methods to (1) identify the interests, strengths, and resources of the technical organization; (2) identify the needs of the local education system; (3) interface with local school system administration, principals, and teachers; and (4) develop a unique plan to match themore » organization`s strengths and resources with the needs of the school system. Following these ``getting started`` activities is the actual program that the Engineering Technology Division implemented in a local elementary school, including the curriculum, topics, and actual lesson plans used by technical personnel in the classroom. Finally, there are enrichment activities for teachers and students, suggestions for measuring the success of an education support program, and an overview of student responses to questions about the overall program.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zinaman, Owen
This presentation details the 21st Century Power Partnership's fellowship program accomplishments from 2016. This fellowship brought two fellows from South Africa's power utility, Eskom, to the U.S. Department of Energy's National Renewable Energy Laboratory. The fellows spent two weeks working to improve the fidelity of Eskom's PLEXOS long-term and short-term models, which are used in long-term generation planning exercises and capacity adequacy assessments. The fellows returned to Eksom equipped with a new suite of tools and skills to enhance Eksom's PLEXOS modeling capabilities.
Network speech systems technology program
NASA Astrophysics Data System (ADS)
Weinstein, C. J.
1981-09-01
This report documents work performed during FY 1981 on the DCA-sponsored Network Speech Systems Technology Program. The two areas of work reported are: (1) communication system studies in support of the evolving Defense Switched Network (DSN) and (2) design and implementation of satellite/terrestrial interfaces for the Experimental Integrated Switched Network (EISN). The system studies focus on the development and evaluation of economical and endurable network routing procedures. Satellite/terrestrial interface development includes circuit-switched and packet-switched connections to the experimental wideband satellite network. Efforts in planning and coordination of EISN experiments are reported in detail in a separate EISN Experiment Plan.
Performance measures in the earth observations commercialization applications program
NASA Astrophysics Data System (ADS)
Macauley, Molly K.
1996-03-01
Performance measures in the Earth Observations Commercialization Application Program (EOCAP) are key to its success and include net profitability; enhancements to industry productivity through generic innovations in industry practices, standards, and protocols; and documented contributions to public policy governing the newly developing remote sensing industry. Because EOCAP requires company co-funding, both parties to the agreement (the government and the corporate partner) have incentives to pursue these goals. Further strengthening progress towards these goals are requirements for business plans in the company's EOCAP proposal, detailed scrutiny given these plans during proposal selection, and regularly documented progress reports during project implementation.
NASA Technical Reports Server (NTRS)
Bekey, I.; Mayer, H. L.; Wolfe, M. G.
1976-01-01
The methodology of alternate world future scenarios is utilized for selecting a plausible, though not advocated, set of future scenarios each of which results in a program plan appropriate for the respective environment. Each such program plan gives rise to different building block and technology requirements, which are analyzed for common need between the NASA and the DoD for each of the alternate world scenarios. An essentially invariant set of system, building block, and technology development plans is presented at the conclusion, intended to allow protection of most of the options for system concepts regardless of what the actual future world environment turns out to be. Thus, building block and technology needs are derived which support: (1) each specific world scenario; (2) all the world scenarios identified in this study; or (3) generalized scenarios applicable to almost any future environment. The output included in this volume consists of the building blocks, i.e.: transportation vehicles, orbital support vehicles, and orbital support facilities; the technology required to support the program plans; identification of their features which could support the DoD and NASA in common; and a complete discussion of the planning methodology.
SAVY-4000 Surveillance and Life Extension Program Fiscal Year 2013 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stone, Timothy A.; Blair, Michael W.; Weis, Eric
2014-03-03
The Packaging Surveillance Program section of the DOE M441.1-1 /sup>1, Nuclear Material Packaging Manual (DOE, 2008) requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” In order to ensure continuing safe storage of nuclear material and the maximization of risk reduction, TA-55 has established a Surveillance Program to ensure storage container integrity for operations within its specified design life. The LANL SAVY-4000 Field Surveillance Plan2 defines the near-term field surveillance plan for SAVY-4000 containers as required by the Manual. A long-term surveillance planmore » will be established based on the results of the first several years of surveillance and the results of the lifetime extension studies as defined in the Accelerated Aging Plan3. This report details progress in positioning the Surveillance Program for successful implementation in FY14 and status of the Design Life Extension Program in terms of its implementation and data collection for FY13.« less
1989-10-01
REVIEW MENU PROGRAM (S) CHAPS PURPOSE AND OVERVIEV The Do Review menu allows the user to select which missions to perform detailed analysis on and...input files must be resident on the computer you are running SUPR on. Any interface or file transfer programs must be successfully executed prior to... COMPUTER PROGRAM WAS DEVELOPED BY SYSTEMS CONTROL TECHNOLOGY FOR THE DEPUTY CHIEF OF STAFF/OPERATIONS,HQ USAFE. THE USE OF THE COMPUTER PROGRAM IS
Review of the Draft 2014 Science Mission Directorate Science Plan
NASA Technical Reports Server (NTRS)
2013-01-01
At the request of NASA's Science Mission Directorate (SMD), the National Research Council's (NRC's) Space Studies Board (SSB) initiated a study to review a draft of the SMD's 2014 Science Plan. The request for this review was made at a time when NASA is engaged in the final stages of a comprehensive, agency-wide effort to develop a new strategic plan and at a time when NASA's budget is under considerable stress. SMD's Science Plan serves to provide more detail on its four traditional science disciplines-astronomy and astrophysics, solar and space physics (also called heliophysics), planetary science, and Earth remote sensing and related activities-than is possible in the agency-wide Strategic Plan. In conducting its review of the draft Science Plan, the Committee on the Assessment of the NASA Science Mission Directorate 2014 Science Plan was charged to comment on the following specific areas: (1) Responsiveness to the NRC's guidance on key science issues and opportunities in recent NRC reports; (2) Attention to interdisciplinary aspects and overall scientific balance; (3) Identification and exposition of important opportunities for partnerships as well as education and public outreach; (4) Integration of technology development with the science program; (5) Clarity on how the plan aligns with SMD's strategic planning process; (6) General readability and clarity of presentation; and (7) Other relevant issues as determined by the committee. The main body of the report provides detailed findings and recommendations relating to the draft Science Plan. The highest-level, crosscutting issues are summarized here, and more detail is available in the main body of the report.
Tug fleet and ground operations schedules and controls. Volume 2: part 1
NASA Technical Reports Server (NTRS)
1975-01-01
This Tug Fleet and Ground Operations Schedules and Controls Study addresses both ground operational data and technical requirements that span the Tug planning phase and operations phase. A similar study covering mission operations (by others) provides the complimentary flight operations details. The two studies provide the planning data requirements, resource allocation, and control milestones for supporting the requirements of the STS program. This Tug Fleet and Ground Operations Schedules and Controls Study incorporates the basic ground operations requirements and concepts provided by previous studies with the interrelationships of the planning, IUS transition, and Tug fleet operations phases. The interrelationships of these phases were studied as a system to optimize overall program benefits and minimize operational risk factors.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Myers, Greg
This final report document summarizes the activities undertaken and the output from three primary deliverables generated during this project. This fifteen month effort comprised numerous key steps including the creation of an international methane hydrate science team, determining and reporting the current state of marine methane hydrate research, convening an international workshop to collect the ideas needed to write a comprehensive Marine Methane Hydrate Field Research Plan and the development and publication of that plan. The following documents represent the primary deliverables of this project and are discussed in summary level detail in this final report: Historical Methane Hydrate Projectmore » Review Report; Methane Hydrate Workshop Report; Topical Report: Marine Methane Hydrate Field Research Plan; and Final Scientific/Technical Report.« less
Underground storage tank management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-09-01
The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective actionmore » is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.« less
Status of SFR Codes and Methods QA Implementation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brunett, Acacia J.; Briggs, Laural L.; Fanning, Thomas H.
2017-01-31
This report details development of the SAS4A/SASSYS-1 SQA Program and describes the initial stages of Program implementation planning. The provisional Program structure, which is largely focused on the establishment of compliant SQA documentation, is outlined in detail, and Program compliance with the appropriate SQA requirements is highlighted. Additional program activities, such as improvements to testing methods and Program surveillance, are also described in this report. Given that the programmatic resources currently granted to development of the SAS4A/SASSYS-1 SQA Program framework are not sufficient to adequately address all SQA requirements (e.g. NQA-1, NUREG/BR-0167, etc.), this report also provides an overview ofmore » the gaps that remain the SQA program, and highlights recommendations on a path forward to resolution of these issues. One key finding of this effort is the identification of the need for an SQA program sustainable over multiple years within DOE annual R&D funding constraints.« less
Puckett, Mary; Neri, Antonio; Underwood, J. Michael; Stewart, Sherri L.
2016-01-01
Obesity, diet and physical inactivity are risk factors for some cancers. Grantees of the National Comprehensive Cancer Control Program (NCCCP) in US states, tribes, and territories develop plans to coordinate funding and activities for cancer prevention and control. Including information and goals related to nutrition and physical activity (NPA) is a key opportunity for primary cancer prevention, but it is currently unclear to what extent NCCCP plans address these issues. We reviewed 69 NCCCP plans and searched for terms related to NPA. Plans were coded as (1) knowledge of NPA and cancer link; (2) goals to improve NPA behaviors; and (3) strategies to increase healthy NPA activities, environments, or systems changes. NPA content was consistently included in all cancer plans examined across all years. Only 4 (6 %) outlined only the relationship between NPA and cancer without goals or strategies. Fifty-nine plans (89 %) contained goals or strategies related to NPA, with 53 (82 %) including both. However, numbers of goals, strategies, and detail provided varied widely. All programs recognized the importance of NPA in cancer prevention. Most plans included NPA goals and strategies. Increasing the presence of NPA strategies that can be modified or adapted appropriately locally could help with more widespread implementation and measurement of NPA interventions. PMID:26994988
Planning guidance for the Chemical Stockpile Emergency Preparedness Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shumpert, B.L.; Watson, A.P.; Sorensen, J.H.
1995-02-01
This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists tomore » assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.« less
ERIC Educational Resources Information Center
Pegler, Klaus
1977-01-01
Gives a detailed ESL (English as a second language) class-hour plan for using a BBC radio news program on vandalism as a social problem. Teaching goals, teaching materials and methodology are discussed. The working texts are appended; the news tests are available free from the author. (Text is in German.) (IFS/WGA)
Air Force Geophysics Laboratory Management Information System Study.
1985-11-01
management information system (MIS) at AFGL. The study summarizes current management and administrative practices at AFGL. Requirements have been identified for automating several currently manual functions to compile accurate and timely information to better manage and plan AFGL programs. This document describes the functions and relative priorities of five MIS subsystems and provides suggestions for implementation solutions. Creation of a detailed Development Plan is recommended as the follow-on task.
ERIC Educational Resources Information Center
Wallen, Carl C.
1975-01-01
The global atmospheric monitoring plans of the World Meteorological Organization are detailed. Single and multipurpose basic monitoring systems and the monitoring of chemical properties are discussed. The relationship of the World Meteorological Organization with the United Nations environment program is discussed. A map of the World…
Segmentation: Slicing the Urban Pie.
ERIC Educational Resources Information Center
Keim, William A.
1981-01-01
Explains market segmentation and defines undifferentiated, concentrated, and differentiated marketing strategies. Describes in detail the marketing planning process at the Metropolitan Community Colleges. Focuses on the development and implementation of an ongoing recruitment program designed for the market segment composed of business employees.…
ERIC Educational Resources Information Center
McKee, Joan M.; Larson, Wendy Ann
1991-01-01
Successful alumni travel programs require good organization, careful targeting, and attention to detail. Planning includes understanding audience demographics, choosing an appropriate tour, knowing current travel trends and constraints, selecting the best host for the group, calculation of costs and tax limitations, choosing a good agent, and…
Creative C.O.W. or a Moo Is Worth a Thousand Words.
ERIC Educational Resources Information Center
Bowers, Arla
1987-01-01
A teacher details a method, the Creative Concrete Operational Writing (Creative C.O.W.) program to provide an individualized structured approach to creative writing in the primary grades. Sample story plans and worksheets are included. (DB)
Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2012-10-24
This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less
Remote sensing as a source of data for outdoor recreation planning
NASA Technical Reports Server (NTRS)
Reed, W. E.; Goodell, H. G.; Emmitt, G. D.
1972-01-01
Specific data needs for outdoor recreation planning and the ability of tested remote sensors to provide sources for these data are examined. Data needs, remote sensor capabilities, availability of imagery, and advantages and problems of incorporating remote sensing data sources into ongoing planning data collection programs are discussed in detail. Examples of the use of imagery to derive data for a range of common planning analyses are provided. A selected bibliography indicates specific uses of data in planning, basic background materials on remote sensing technology, and sources of information on environmental information systems expected to use remote sensing to provide new environmental data of use in outdoor recreation planning.
Where population planning makes a dent: (Indonesia).
Mcculla, J W
1979-03-15
In 1969, the government of Indonesia threw its full support behind a family planning program for the country. Since that time, more than 1/2 the women on the islands of Java and Bali have accepted family planning. In 1978, more than 1/4 of the married women of child-bearing age on the 2 islands were practicing some form of contraception. The fertility rate has dropped by 15% and planners hope for 50% acceptance by 1982. These successes are more remarkable when the poverty and cultural backwardness of the country is considered. Reasons for the extraordinary success of the program are: 1) total commitment of the government with interdepartmental organization; 2) adequate financing and technical support from outside sources; 3) detailed organization; 4) local involvement; 5) support of the country's major religious groups; and 6) the flexibility of the program's young administrators. Outside financing, especially by USAID, is discussed. Population density in Indonesia is so severe that success of the program is indispensable to future development of the country.
ERIC Educational Resources Information Center
Dalrymple, Nancy; And Others
Sex education for individuals with autism needs to be a part of planned instructional programs covering a variety of settings and foci, from health and hygiene to social skills and dating. The manner and amount of detail during the instruction will depend on the functioning level of the person being taught and what teaching strategies are most…
High temperature arc-track resistant aerospace insulation
NASA Technical Reports Server (NTRS)
Dorogy, William
1994-01-01
The topics are presented in viewgraph form and include the following: high temperature aerospace insulation; Foster-Miller approach to develop a 300 C rated, arc-track resistant aerospace insulation; advantages and disadvantages of key structural features; summary goals and achievements of the phase 1 program; performance goals for selected materials; materials under evaluation; molecular structures of candidate polymers; candidate polymer properties; film properties; and a detailed program plan.
Advanced composite elevator for Boeing 727 aircraft
NASA Technical Reports Server (NTRS)
1979-01-01
Detail design activities are reported for a program to develop an advanced composites elevator for the Boeing 727 commercial transport. Design activities include discussion of the full scale ground test and flight test activities, the ancillary test programs, sustaining efforts, weight status, and the production status. Prior to flight testing of the advanced composites elevator, ground, flight flutter, and stability and control test plans were reviewed and approved by the FAA. Both the ground test and the flight test were conducted according to the approved plan, and were witnessed by the FAA. Three and one half shipsets have now been fabricated without any significant difficulty being encountered. Two elevator system shipsets were weighed, and results validated the 26% predicted weight reduction. The program is on schedule.
Urban Planning and Management Information Systems Analysis and Design Based on GIS
NASA Astrophysics Data System (ADS)
Xin, Wang
Based on the analysis of existing relevant systems on the basis of inadequate, after a detailed investigation and research, urban planning and management information system will be designed for three-tier structure system, under the LAN using C/S mode architecture. Related functions for the system designed in accordance with the requirements of the architecture design of the functional relationships between the modules. Analysis of the relevant interface and design, data storage solutions proposed. The design for small and medium urban planning information system provides a viable building program.
Underground storage tank management plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-09-01
The Underground Storage Tank (UST) Program at the Oak Ridge Y-12 Plant was established to locate UST systems at the facility and to ensure that all operating UST systems are free of leaks. UST systems have been removed or upgraded in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance. With the closure of a significant portion of the USTs, the continuing mission of the UST Management Program is to manage the remaining active UST systems and continue corrective actions in a safe regulatory compliant manner. This Program outlines the compliance issues that must be addressed, reviewsmore » the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Program provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. The plan is divided into three major sections: (1) regulatory requirements, (2) active UST sites, and (3) out-of-service UST sites. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Program, and the procedures and guidance for compliance.« less
PLANS: A finite element program for nonlinear analysis of structures. Volume 1: Theoretical manual
NASA Technical Reports Server (NTRS)
Pifko, A.; Levine, H. S.; Armen, H., Jr.
1975-01-01
The PLANS system is described which is a finite element program for nonlinear analysis. The system represents a collection of special purpose computer programs each associated with a distinct physical problem class. Modules of PLANS specifically referenced and described in detail include: (1) REVBY, for the plastic analysis of bodies of revolution; (2) OUT-OF-PLANE, for the plastic analysis of 3-D built-up structures where membrane effects are predominant; (3) BEND, for the plastic analysis of built-up structures where bending and membrane effects are significant; (4) HEX, for the 3-D elastic-plastic analysis of general solids; and (5) OUT-OF-PLANE-MG, for material and geometrically nonlinear analysis of built-up structures. The SATELLITE program for data debugging and plotting of input geometries is also described. The theoretical foundations upon which the analysis is based are presented. Discussed are the form of the governing equations, the methods of solution, plasticity theories available, a general system description and flow of the programs, and the elements available for use.
A statewide Crisis Intervention Team (CIT) initiative: evolution of the Georgia CIT program.
Oliva, Janet R; Compton, Michael T
2008-01-01
In late 2004, Georgia began implementation of a statewide Crisis Intervention Team (CIT) program to train a portion of its law enforcement officers to respond safely and effectively to individuals with mental illnesses who are in crisis. This overview provides a description of the evolution of the Georgia CIT, including discussions of the historical context in which the program developed; the program's vision, mission, and objectives; the importance of the multidisciplinary Georgia CIT Advisory Board; the training curriculum; the role played by state and local coordinators; the value of stakeholders' meetings; practical operations of the program; the importance of considering the adequacy of community-based and hospital-based psychiatric services; costs and funding; the program's expansion plan; and evaluation, research, and academic collaborations. These detailed descriptions of the Georgia CIT program may be useful for professionals involved in local, regional, or state CIT program planning and may provide a practical synopsis of one example of this collaborative model that is being rapidly disseminated across the U.S.
Lipsky, Alyson B; Gribble, James N; Cahaelen, Linda; Sharma, Suneeta
2016-01-01
ABSTRACT In global health, partnerships between practitioners and policy makers facilitate stakeholders in jointly addressing those issues that require multiple perspectives for developing, implementing, and evaluating plans, strategies, and programs. For family planning, costed implementation plans (CIPs) are developed through a strategic government-led consultative process that results in a detailed plan for program activities and an estimate of the funding required to achieve an established set of goals. Since 2009, many countries have developed CIPs. Conventionally, the CIP approach has not been defined with partnerships as a focal point; nevertheless, cooperation between key stakeholders is vital to CIP development and execution. Uganda launched a CIP in November 2014, thus providing an opportunity to examine the process through a partnership lens. This article describes Uganda’s CIP development process in detail, grounded in a framework for assessing partnerships, and provides the findings from 22 key informant interviews. Findings reveal strengths in Uganda’s CIP development process, such as willingness to adapt and strong senior management support. However, the evaluation also highlighted challenges, including district health officers (DHOs), who are a key group of implementers, feeling excluded from the development process. There was also a lack of planning around long-term partnership practices that could help address anticipated execution challenges. The authors recommend that future CIP development efforts use a long-term partnership strategy that fosters accountability by encompassing both the short-term goal of developing the CIP and the longer-term goal of achieving the CIP objectives. Although this study focused on Uganda’s CIP for family planning, its lessons have implications for any policy or strategy development efforts that require multiple stakeholders to ensure successful execution. PMID:27353621
Davidson, Anne; McKerrow, Alexa; Long, Don; Earnhardt, Todd
2015-01-01
The intended target audience for this document initially is management and project technical specialist and scientists involved in the Gap Analysis Program (GAP) and the Landscape Fire and Resource Management Planning Tools - (LANDFIRE) program to help communicate coordination activities to all involved parties. This document is also intended to give background information in other parts of the USGS and beyond, although some details given are relatively oriented to management of the respective programs. Because the Gap Analysis Program (GAP) and the Landscape Fire and Resource Management Planning Tools - LANDFIRE programs both rely on characterizations of land cover using similar scales and resolutions, the programs have been coordinating their work to improve scientific consistency and efficiency of production. Initial discussions and informal sharing of ideas and work began in 2008. Although this collaboration was fruitful, there was no formal process for reporting results, plans, or outstanding issues, nor was there any formally-defined coordinated management team that spanned the two programs. In 2012, leadership from the two programs agreed to strengthen the coordination of their respective work efforts. In 2013 the GAP and LANDFIRE programs developed an umbrella plan of objectives and components related to three mutual focus areas for the GAP and LANDFIRE collaboration for the years 2013 and 2014 (GAP/LANDFIRE 2013). The evolution of this partnership resulted in the drafting of an inter-program Memorandum of Understanding (MOU) in 2014. This MOU identified three coordination topics relevant to the two programs participating at this point in the MOU history: Vegetation mappingDisturbance classesFormal quality assessment
Site scientific mission plan for the Southern Great Plains CART site, January-June 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schneider, J.M.; Lamb, P.J.; Sisterson, D.L.
1994-12-01
The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on January 1, 1995, and also looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Experiment Support Team [EST], Operations Team, Data Management Teammore » [DMT], Instrument Team [IT], and Campaign Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary envisaged site activities, together with information concerning approved and proposed Intensive Observation Periods (IOPs). Amendments will be prepared and distributed whenever the content changes by more than 30% within a six-month period. The primary users of this document are the site operator, the site scientist, the Science Team through the ARM Program Science Director, The ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that will be updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.« less
A Writing-Intensive Program for Teaching Retail Management.
ERIC Educational Resources Information Center
Darian, Jean C.; And Others
1992-01-01
Presents the writing-intensive design for a retailing management course developed by its instructor in accordance with writing-across-the-curriculum principles. Provides an overview of the semester-long project. Details project procedures for preparatory activities, field research, and writing the marketing plan. (SR)
Dietary Interviewing by Computer.
ERIC Educational Resources Information Center
Slack, Warner V.; And Others
1976-01-01
A computer based dietary interviewing program enhanced self awareness for overweight participants. In a three part interview designed for direct interaction between patient and computer, questions dealt with general dietary behavior and details of food intake. The computer assisted the patient in planning a weight reducing diet of approximately…
NASA Technical Reports Server (NTRS)
1972-01-01
The planning data are presented for subsequent phases of free-flying teleoperator program (FFTO) and includes costs, schedules and supporting research and technology activities required to implement the free-flying teleoperator system and associated flight equipment. The purpose of the data presented is to provide NASA with the information needed to continue development of the FFTO and integrate it into the space shuttle program. The planning data describes three major program phases consisting of activities and events scheduled to effect integrated design, development, fabrication and operation of an FFTO system. Phase A, Concept Generation, represents a study effort directed toward generating and evaluating a number of feasible FFTO experiment system concepts. Phase B, Definition, will include preliminary design and supporting analysis of the FFTO, the shuttle based equipment and ground support equipment. Phase C/D, Design, Development and Operations will include detail design of the operational FFTO, its integration into the space shuttle, hardware fabrication and testing, delivery of flight hardware and support of flight operations. Emphasis is placed on the planning for Phases A and B since these studies will be implemented early in the development cycle. Phase C/D planning is more general and subject to refinement during the definition phase.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Iman, R.L.; Anderson, D.J.; Burress, R.V.
1995-06-01
The LRSTF combined the efforts of industry, military, and government to evaluate low-residue soldering processes for military and commercial applications. These processes were selected for evaluation because they provide a means for the military to support the presidential mandate while producing reliable hardware at a lower cost. This report presents the complete details and results of a testing program conducted by the LRSTF to evaluate low-residue soldering for printed wiring assemblies. A previous informal document provided details of the test plan used in this evaluation. Many of the details of that test plan are contained in this report. The testmore » data are too massive to include in this report, however, these data are available on disk as Excel spreadsheets upon request. The main purpose of low-residue soldering is to eliminate waste streams during the manufacturing process.« less
NASA Technical Reports Server (NTRS)
Walters, R. L.; Eastmond, R. J.; Barr, B. G.
1973-01-01
Project summaries and project reports are presented in the area of satellite remote sensing as applied to local, regional, and national environmental programs. Projects reports include: (1) Douglas County applications program; (2) vegetation damage and heavy metal concentration in new lead belt; (3) evaluating reclamation of strip-mined land; (4) remote sensing applied to land use planning at Clinton Reservoir; and (5) detailed land use mapping in Kansas City, Kansas.
NASA's Optical Communications Program for 2015 and Beyond
NASA Technical Reports Server (NTRS)
Cornwell, Donald M.
2015-01-01
NASA's Space Communications and Navigation (SCaN) program at NASA headquarters is pursuing a vibrant and wide-ranging optical communications program for further planetary and near-Earth missions following the spectacular success of NASA's Lunar Laser Communication Demonstration (LLCD) from the Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft orbiting the moon in 2013. This invited paper will discuss NASA's new laser communication missions, key scenarios and details, and the plans to infuse this new technology into NASA's existing communications networks.
U.S. Virgin Islands Petroleum Price-Spike Preparation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, C.
2012-06-01
This NREL technical report details a plan for the U.S. Virgin Islands (USVI) to minimize the economic damage caused by major petroleum price increases. The assumptions for this plan are that the USVI will have very little time and money to implement it and that the population will be highly motivated to follow it because of high fuel prices. The plan's success, therefore, is highly dependent on behavior change. This plan was derived largely from a review of the actions taken and behavior changes made by companies and commuters throughout the United States in response to the oil price spikemore » of 2008. Many of these solutions were coordinated by or reported through the 88 local representatives of the U.S. Department of Energy's Clean Cities program. The National Renewable Energy Laboratory provides technical and communications support for the Clean Cities program and therefore serves as a de facto repository of these solutions. This plan is the first publication that has tapped this repository.« less
Human Research Program: Long Duration, Exploration-Class Mission Training Design
NASA Technical Reports Server (NTRS)
Barshi, Immanuel; Dempsey, Donna L.
2016-01-01
This is a presentation to the International Training Control Board that oversees astronaut training for ISS. The presentation explains the structure of HRP, the training-related work happening under the different program elements, and discusses in detail the research plan for the Training Risk under SHFHSHFE. The group includes the crew training leads for all the space agencies involved in ISS: Japan, Europe, Russia, Canada, and the US.
The STS pilot user development program
NASA Technical Reports Server (NTRS)
Mcdowell, J. R.
1977-01-01
The planning and preparation activities and the results of the briefings associated with the Paris Air Show are described. A team of key personnel were available during the show to familiarize international users with the STS program and the space shuttle capabilities. Participation at the show included the operation of an STS booth at the U.S. pavilion, the presentation of several invitational briefings, and detailed discussions with individual organizations.
High- and low-thrust propulsion systems for the space station
NASA Technical Reports Server (NTRS)
Jones, R. E.
1987-01-01
The purpose of the Advanced Development program was to investigate propulsion options for the space station. Two options were investigated in detail: a high-thrust system consisting of 25 to 50 lbf gaseous oxygen/hydrogen rockets, and a low-thrust system of 0.1 lbf multipropellant resistojets. An effort is also being conducted to determine the life capability of hydrazine-fueled thrusters. During the course of this program, studies clearly identified the benefits of utilizing waste water and other fluids as propellant sources. The results of the H/O thruster test programs are presented and the plan to determine the life of hydrazine thrusters is discussed. The background required to establish a long-life resistojet is presented and the first design model is shown in detail.
Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Klus, W. J.
1987-01-01
The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.
NICMOS Cycles 13 and 14 Calibration Plans
NASA Astrophysics Data System (ADS)
Arribas, Santiago; Bergeron, Eddie; de Jong, Roeof; Malhotra, Sangeeta; Mobasher, Bahram; Noll, Keith; Schultz, Al; Wiklind, Tommy; Xu, Chun
2005-11-01
This document summarizes the NICMOS Calibration Plans for Cycles 13 and 14. These plans complement the SMOV3b, the Cycle 10 (interim), and the Cycles 11 and 12 (regular) calibration programs executed after the installation of the NICMOS Cooling System (NCS).. These previous programs have shown that the instrument is very stable, which has motivated a further reduction in the frequency of the monitoring programs for Cycle 13. In addition, for Cycle 14 some of these programs were slightly modified to account for 2 Gyro HST operations. The special calibrations on Cycle 13 were focussed on a follow up of the spectroscopic recalibration initiated in Cycle 12. This program led to the discovery of a possible count rate non-linearity, which has triggered a special program for Cycle 13 and a number of subsequent tests and calibrations during Cycle 14. At the time of writing this is a very active area of research. We also briefly comment on other calibrations defined to address other specific issues like: the autoreset test, the SPAR sequences tests, and the low-frequency flat residual for NIC1. The calibration programs for the 2-Gyro campaigns are not included here, since they have been described somewhere else. Further details and updates on specific programs can be found via the NICMOS web site.
ERIC Educational Resources Information Center
Katoch, C. D.
This book is designed for forest nursery planning and management by all levels of forestry professionals and non-professionals in India and abroad, and focuses on the preparation of high quality, healthy seedlings necessary for successful afforestation programs. The book is divided into five parts that discuss: (1) details of nursery preparations…
Faculty Planning and Affirmative Action
ERIC Educational Resources Information Center
Linnell, Robert H.; Gray, Paul
1977-01-01
The use of a model to examine the impact of affirmative action policies on the female/male ratio of a faculty of natural sciences is reported. Increased analysis and detailed study of suggested alternatives can lead to better resolution of the problems and potentials of affirmative action programs. (LBH)
Training Guidelines. Operatives-Precast Concrete.
ERIC Educational Resources Information Center
Ceramics, Glass, and Mineral Products Industry Training Board, Harrow (England).
This manual is intended to provide guidelines for firms in the precast concrete industry in planning their training programs particularly with reference to new entrants into the industry. Details for preparing training syllabuses for various job specifications are given--mould makers in timber, steel, and glass fiber; makers; finishers; site…
DEPARTMENTALIZATION OF READING IN ELEMENTARY AND SECONDARY SCHOOLS.
ERIC Educational Resources Information Center
STOWE, ELAINE H.
DEPARTMENTALIZATION IS A FORM OF GROUPING FOR INSTRUCTION, AN ADMINISTRATIVE METHOD FOR ASSIGNING PUPILS TO TEACHERS IN SOME PLANNED MANNER. SOME PRECEDENTS FOR THE RECENT REVIVAL OF DEPARTMENTALIZATION IN THE ELEMENTARY GRADES ARE CITED. THE FOLLOWING EXAMPLES OF DEPARTMENTALIZATION ORGANIZATION ARE DISCUSSED IN DETAIL--A PROGRAM INVOLVING…
SPACE: Intermediate Level Modules.
ERIC Educational Resources Information Center
Indiana State Dept. of Education, Indianapolis. Center for School Improvement and Performance.
These modules were developed to assist teachers at the intermediate level to move away from extensive skill practice and toward more meaningful interdisciplinary learning. This packet, to be used by teachers in the summer Extended Learning Program, provides detailed thematic lesson plans matched to the Indiana Curriculum Proficiency Guide. The…
Long-term prospects for developments in space: A scenario approach
NASA Technical Reports Server (NTRS)
Brown, W. M.; Kahn, H. D.
1977-01-01
Long-term plans for future NASA programs are reported, and some of the following topics are discussed in detail: (1) systematic formulation of space scenarios; (2) the basic international context; (3) potential 21st century space developments; (4) space vehicle developments; and (5) future exploration.
Code of Federal Regulations, 2013 CFR
2013-07-01
...). PPBS papers and associated data set forth the details of proposed programs and plans. Access to this... which release is restricted. The information identified below may be released only as set forth herein... cost or pricing data, profit data, overhead and direct labor rates, and manufacturing processes and...
Code of Federal Regulations, 2011 CFR
2011-07-01
...). PPBS papers and associated data set forth the details of proposed programs and plans. Access to this... which release is restricted. The information identified below may be released only as set forth herein... cost or pricing data, profit data, overhead and direct labor rates, and manufacturing processes and...
Code of Federal Regulations, 2012 CFR
2012-07-01
...). PPBS papers and associated data set forth the details of proposed programs and plans. Access to this... which release is restricted. The information identified below may be released only as set forth herein... cost or pricing data, profit data, overhead and direct labor rates, and manufacturing processes and...
40 CFR 51.350 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-07-01
... applicable areas in detail and, consistent with § 51.372 of this subpart, shall include the legal authority... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Applicability. 51.350 Section 51.350... PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Inspection/Maintenance Program Requirements § 51...
76 FR 31390 - Public Hearing and Commission Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-31
... of two docket approvals; (3) action on certain water resources projects; (4) action on seven projects... Comprehensive Plan for Management of the Water Resources of the Susquehanna River Basin. Details concerning the... on the following items: (1) The proposed Water Resources Program and an accompanying presentation on...
Piaget's Theories and Some Possible Implications for Educational Television.
ERIC Educational Resources Information Center
Bliss, Joan; And Others
1983-01-01
Details Piaget's four stages in the cognitive development of children--the sensorimotor period, pre-operational stage, concrete operational stage, and formal operational stage--and discusses their implications for the planning and design of programs for instructional television, and possible effects on mental development and the cognitive…
2011-03-31
protocols conducted in Iraq. His office had been designated by the 1 A research protocol is a formal document detailing the study methodology and the...Human Research Protections Program plan requires scientific peer review to ensure that research is scientifically sound in its design and methods, and...ofthe approved research protocol and IRB minutes, revealed that there was no mention of "active rehabilitation and exercise" under the design
RMA Abandoned Well Closure Program. Final Task Plan, Version 3.0.
1989-05-01
20503. 1 . AGENCY USE ONLY (Leave blank) 2. REPORT DATE" 0 3. REPORT TYPE AND DATES COVERED _T 05/00/89 __________________ 4. TITLE AND SUBTITLE S...AQUIFERS. THE SCOPE OF WORK INCLUDES: 1 . COMPILATION OF A WELL INVENTORY AND DATABASE 2. FIELD LOCATION OF WELLS 3. CLEANING AND CLOSURE OF...APPROXIMATELY 350 WELT- 4. DOCUMENTATION OF CLOSURE ACTIVITIES. SECTIONS OF THIS TASK PLAN DETAIL-INFORMATION ON: 1 . ABANDONED WELL IDENTIFICATION AND LOCATION
2002-01-01
e.g., employer or Medicare). Thus we focus on the details of theory of consumer preferences and choices in the discussion below, while providing similar...health status. Two important factors in consumer health plan choices are inherent to any insurance market. First, the consumer preferences that guide...important factors in consumer health plan choices are inherent to any insurance market. First, the consumer preferences that guide their choices of
NASA Technical Reports Server (NTRS)
Naiman, Cynthia Gutierrez
2010-01-01
Advancing and exploring the science of Multidisciplinary Analysis & Optimization (MDAO) capabilities are high-level goals in the Fundamental Aeronautics Program s Subsonic Fixed Wing (SFW) project. The OpenMDAO team has made significant progress toward completing the Alpha OpenMDAO deliverable due in September 2010. Included in the presentation are: details of progress on developing the OpenMDAO framework, example usage of OpenMDAO, technology transfer plans, near term plans, progress toward establishing partnerships with external parties, and discussion of additional potential collaborations.
2013-01-01
Objective Several physical activity interventions have been effective in improving the health outcomes of breast cancer survivors. However, few interventions have provided detailed descriptions regarding how such interventions work. To develop evidence-based practice in this field, detailed descriptions of intervention development and delivery is needed. This paper aims to (1) describe the theory-and evidence-based development of the Move More for Life program, a physical activity program for breast cancer survivors; and (2) serve as an exemplar for theory-based applied research. Method The program-planning model outlined by Kreuter and colleagues was used to develop the computer-tailored intervention. Results The tailoring guide developed by Kreuter and colleagues served as a useful program planning tool in terms of integrating theory and evidence-based best practice into intervention strategies. Overall, participants rated the intervention positively, with the majority reporting that the tailored materials caught their attention, were personally relevant to them, and were useful for helping them to change their behaviour. However, there was considerable room for improvement. Conclusion The Move More for Life program is an example of a theory-based, low-cost and potentially sustainable strategy to physical activity promotion and may stand as an exemplar for Social Cognitive Theory-based applied research. By providing a detailed description of the development of the Move More for Life program, a critical evaluation of the working mechanisms of the intervention is possible, and will guide researchers in the replication or adaption and re-application of the specified techniques. This has potential implications for researchers examining physical activity promotion among cancer survivors and for researchers exploring distance-based physical activity promotion techniques among other populations. Trial registrations Australian New Zealand Clinical Trials Registry (ANZCTR) identifier: ACTRN12611001061921. PMID:24192320
Purcell, David W.; Fisher, Holly H.; Belcher, Lisa; Carey, James W.; Courtenay-Quirk, Cari; Dunbar, Erica; Eke, Agatha N.; Galindo, Carla A.; Glassman, Marlene; Margolis, Andrew D.; Neumann, Mary Spink; Prather, Cynthia; Stratford, Dale; Taylor, Raekiela D.; Mermin, Jonathan
2016-01-01
In September 2010, CDC launched the Enhanced Comprehensive HIV Prevention Planning (ECHPP) project to shift HIV-related activities to meet goals of the 2010 National HIV/AIDS Strategy (NHAS). Twelve health departments in cities with high AIDS burden participated. These 12 grantees submitted plans detailing jurisdiction-level goals, strategies, and objectives for HIV prevention and care activities. We reviewed plans to identify themes in the planning process and initial implementation. Planning themes included data integration, broad engagement of partners, and resource allocation modeling. Implementation themes included organizational change, building partnerships, enhancing data use, developing protocols and policies, and providing training and technical assistance for new and expanded activities. Pilot programs also allowed grantees to assess the feasibility of large-scale implementation. These findings indicate that health departments in areas hardest hit by HIV are shifting their HIV prevention and care programs to increase local impact. Examples from ECHPP will be of interest to other health departments as they work toward meeting the NHAS goals. PMID:26843670
A screening mammography program. Staying alive and making it work.
Monsees, B S; Destouet, J M
1992-01-01
The success of a mammography screening program requires thorough planning. A dependably high volume and a streamlined efficient operation are essential to survival of the program. Factors that warrant consideration prior to designing such a program include the following: Distinction between screening and diagnostic mammography examinations. Selection of a site that will meet the needs of the community and yet provide a consistently high volume. Low examination cost for screening mammography coupled with a detailed financial analysis and reappraisal on an ongoing basis. A customized marketing program that incorporates methods to increase awareness, compliance, and utilization by women and referring physicians. Well-trained, efficient, and dedicated personnel. An operation that is designed for rapid throughput and expeditious patient flow. An efficient plan for film handling, interpretation, reporting, and storage. Timely communication of examination results. A reliable mechanism for follow-up evaluation and outcome data collection. Establishment of a consistent and reliable quality assurance program and the production of high quality mammograms.
Daniel, Donna M; Casey, Donald E; Levine, Jeffrey L; Kaye, Susan T; Dardik, Raquel B; Varkey, Prathibha; Pierce-Boggs, Kimberly
2009-12-01
The Accreditation Council for Graduate Medical Education recently emphasized the importance of systems-based practice and systems-based learning; however, successful models of collaborative quality improvement (QI) initiatives in residency training curricula are not widely available. Atlantic Health successfully conceptualized and implemented a QI collaborative focused on medication safety across eight residency training programs representing 219 residents. During a six-month period, key faculty and resident leaders from 8 (of 10) Atlantic Health residency training programs participated in three half-day collaborative learning sessions focused on improving medication reconciliation. Each session included didactic presentations from a multidisciplinary team of clinical experts as well as the application of principles that identified challenges, barriers, and solutions to QI initiatives. The learning sessions emphasized the fundamental principles of medication reconciliation, its critical importance as a vital part of patient handoff in all health care settings, and the challenges of achieving successful medication reconciliation improvement in light of work hours restrictions and patient loads. Each residency program developed a detailed implementation and measurement plan for individual "action learning" projects, using the Plan-Do-Study-Act method of improvement. Each program then implemented its QI project, and expert faculty (e.g., physicians, nurses, pharmacists, QI staff) provided mentoring between learning sessions. Several projects resulted in permanent changes in medication reconciliation processes, which were then adopted by other programs. The structure, process, and outcomes of this effort are described in detail.
Utilizing grassroots workers in family planning programs in India: prospects and problems.
Mani, S B
1991-01-01
In order to rapidly expand the network of delivery systems and speed up the process of acceptance of family planning messages and methods, a shift took place in the Indian family planning program from the bureaucratic "clinical" approach to the people oriented "extension" approach. As a result, there is an increasing emphasis on moving the family planning efforts closer to the grassroots level. A key methodological issue centers on the proper selection, cultural acceptability, and the effectiveness of the grassroots workers who are to be trained and through whom family planning motivational messages and methods are to be introduced. The Indian government, from time to time, has trained and utilized different groups of grassroots workers in its family planning promotional efforts. Anthropological field studies were conducted in two different regions in India to examine the potential and actual roles of two groups of grassroots workers--opinion leaders and traditional birth attendants--in the delivery of family planning services in the rural areas. These studies revealed that while the traditional birth attendants can be trained and utilized to a limited extent in promoting family planning efforts, especially to the eligible female clients, the role of the opinion leaders in such efforts is at best questionable. Based on these field studies, cultural and technical (including bureaucratic) problems in training and utilizing opinion leaders and traditional birth attendants are explored in detail. Modifications in the training program strategies are suggested to improve and expand the family planning delivery system in rural India.
The Warm-Hot Intergalactic Medium
NASA Technical Reports Server (NTRS)
Hayes, Jeffrey (Technical Monitor)
2005-01-01
This grant is associated to a 5-year LTSA grant, on "Studying the Largest Reservoir of Baryons in the Universe: The Warm-Hot Intergalactic Medium". The first year of work within this program has been very rich, and has already produced several important results, as detailed in this paper. Table 2 of our original proposal justification, listed the planned year-by-year program, divided into two sub-fields: (A) the study of the z=0 (or Local Group WHIM) system, and (B) the study of the z greater than 0 (i.e- intervening WHIM) systems. For each of the two sub-fields we had planned to analyze, in the first year, a number of archival (Chandra, XMM and FUSE) and new (if observed) sightlines. Moreover, the plan for the z=0 system included the search for new interesting sightlines. We have accomplished all these tasks.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Osborn, Douglas; Solom, Matthew
This document details the milestone approach to define the true operating limitations (margins) of the Terry turbopump systems used in the nuclear industry for Milestone 3 (full-scale component experiments) and Milestone 4 (Terry turbopump basic science experiments) efforts. The overall multinational-sponsored program creates the technical basis to: (1) reduce and defer additional utility costs, (2) simplify plant operations, and (3) provide a better understanding of the true margin which could reduce overall risk of operations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Solom, Matthew; Ross, Kyle; Cardoni, Jeffrey N.
This document details the milestone approach to define the true operating limitations (margins) of the Terry turbopump systems used in the nuclear industry for Milestone 3 (full-scale component experiments) and Milestone 4 (Terry turbopump basic science experiments) efforts. The overall multinational-sponsored program creates the technical basis to: (1) reduce and defer additional utility costs, (2) simplify plant operations, and (3) provide a better understanding of the true margin which could reduce overall risk of operations.
Standard practices for the implementation of computer software
NASA Technical Reports Server (NTRS)
Irvine, A. P. (Editor)
1978-01-01
A standard approach to the development of computer program is provided that covers the file cycle of software development from the planning and requirements phase through the software acceptance testing phase. All documents necessary to provide the required visibility into the software life cycle process are discussed in detail.
PLANNING FOR INSTRUCTIONAL TELEVISION.
ERIC Educational Resources Information Center
WIENS, JACOB H.
EXPERIENCES OF THREE JUNIOR COLLEGES WERE THE BASIS FOR THIS SUMMARY OF (1) PROCEDURES FOR ACQUIRING A TELEVISION CHANNEL, (2) METHODS OF SETTING UP AND FINANCING A STATION, AND (3) PROGRAMS SUITABLE FOR A DISTRICT OWNED STATION. THE COMPLEXITIES OF ACQUIRING A CHANNEL ASSIGNMENT ARE DESCRIBED IN DETAIL, INCLUDING THE FUNCTIONS OF LAWYERS AND…
The Space Telescope Observatory
NASA Technical Reports Server (NTRS)
Bahcall, J. N.; Odell, C. R.
1979-01-01
A convenient guide to the expected characteristics of the Space Telescope Observatory for astronomers and physicists is presented. An attempt is made to provide enough detail so that a professional scientist, observer or theorist, can plan how the observatory may be used to further his observing programs or to test theoretical models.
Code of Federal Regulations, 2013 CFR
2013-07-01
... written operation and maintenance plan required under § 63.1447(b) detailed descriptions of the procedures... with the emission limitations, work practice standards, and operation and maintenance requirements that... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
Code of Federal Regulations, 2011 CFR
2011-07-01
... written operation and maintenance plan required under § 63.1447(b) detailed descriptions of the procedures... with the emission limitations, work practice standards, and operation and maintenance requirements that... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
Code of Federal Regulations, 2010 CFR
2010-07-01
... written operation and maintenance plan required under § 63.1447(b) detailed descriptions of the procedures... with the emission limitations, work practice standards, and operation and maintenance requirements that... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
Code of Federal Regulations, 2012 CFR
2012-07-01
... written operation and maintenance plan required under § 63.1447(b) detailed descriptions of the procedures... compliance with the emission limitations, work practice standards, and operation and maintenance requirements... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
Code of Federal Regulations, 2014 CFR
2014-07-01
... written operation and maintenance plan required under § 63.1447(b) detailed descriptions of the procedures... compliance with the emission limitations, work practice standards, and operation and maintenance requirements... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
Countdown to Curtain: A Marketing Timetable.
ERIC Educational Resources Information Center
Neiman, Marcus; Thoms, Paul E.
1992-01-01
Discusses methods of raising public awareness of school music performances. Argues that communication is the key to assuring public support. Presents a long-range plan for promoting events. Describes detailed procedures to follow both before and after the performance. Suggestions that effective promotion will benefit the school, the program, and…
Integrating Sustainability Programs into the Facilities Capital Planning Process
ERIC Educational Resources Information Center
Buchanan, Susan
2011-01-01
With detailed information about the costs and benefits of potential green investments, educational facilities can effectively evaluate which initiatives will ultimately provide the greatest results over the short and long term. Based on its overall goals, every school, college, or university will have different values and therefore different…
32 CFR 256.5 - The air installation compatible use program.
Code of Federal Regulations, 2011 CFR
2011-07-01
...: (1) Determination by detailed study of flight operations, actual noise and safety surveys if... due to noise characteristics and safety of flight; (2) Identification of present incompatible land...) Ensure that other local, State or Federal agencies engaged in land use planning or land regulation for a...
32 CFR 256.5 - The air installation compatible use program.
Code of Federal Regulations, 2010 CFR
2010-07-01
...: (1) Determination by detailed study of flight operations, actual noise and safety surveys if... due to noise characteristics and safety of flight; (2) Identification of present incompatible land...) Ensure that other local, State or Federal agencies engaged in land use planning or land regulation for a...
Handbook for Monitoring Industrial Wastewater.
ERIC Educational Resources Information Center
Associated Water & Air Resources Engineers, Inc., Nashville, TN.
This manual for industrial wastewater monitoring covers the philosophy of monitoring needs, planning, sampling, measuring, and analysis. Sufficient detail is given for those who wish to explore more deeply some of the practical and theoretical aspects of any of the phases of a monitoring program. A logical procedure is suggested and direction…
Indian Solar Cities Programme: An Overview of Major Activities and Accomplishments; Preprint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kandt, A.
This paper details the Indian Solar City Programme, provides an overview of one city's Master Plan and implementation progress, describes NREL's support of the Indian Solar City Programme, and outlines synergies and differences between the Indian and American programs including unique challenges and opportunities India is facing.
Asset Management Plan: 1998-2003.
ERIC Educational Resources Information Center
Jefferson County School District R-1, Denver, CO.
The Jefferson County School District (Denver, Colorado) presents its final scheduling and funding source information for the 1998-2003 capital improvement program and the status of the 1992-1997 completed capital improvement project costs compared to the budget. Funding data are detailed for each of the district's 182 public schools, special use…
Max '91: Flare research at the next solar maximum
NASA Technical Reports Server (NTRS)
Dennis, Brian; Canfield, Richard; Bruner, Marilyn; Emslie, Gordon; Hildner, Ernest; Hudson, Hugh; Hurford, Gordon; Lin, Robert; Novick, Robert; Tarbell, Ted
1988-01-01
To address the central scientific questions surrounding solar flares, coordinated observations of electromagnetic radiation and energetic particles must be made from spacecraft, balloons, rockets, and ground-based observatories. A program to enhance capabilities in these areas in preparation for the next solar maximum in 1991 is recommended. The major scientific issues are described, and required observations and coordination of observations and analyses are detailed. A program plan and conceptual budgets are provided.
The Manned Spacecraft Center and medical technology
NASA Technical Reports Server (NTRS)
Johnston, R. S.; Pool, S. L.
1974-01-01
A number of medically oriented research and hardware development programs in support of manned space flights have been sponsored by NASA. Blood pressure measuring systems for use in spacecraft are considered. In some cases, complete new bioinstrumentation systems were necessary to accomplish a specific physiological study. Plans for medical research during the Skylab program are discussed along with general questions regarding space-borne health service systems and details concerning the Health Services Support Control Center.
NASA ATP Force Measurement Technology Capability Strategic Plan
NASA Technical Reports Server (NTRS)
Rhew, Ray D.
2008-01-01
The Aeronautics Test Program (ATP) within the National Aeronautics and Space Administration (NASA) Aeronautics Research Mission Directorate (ARMD) initiated a strategic planning effort to re-vitalize the force measurement capability within NASA. The team responsible for developing the plan included members from three NASA Centers (Langley, Ames and Glenn) as well as members from the Air Force s Arnold Engineering and Development Center (AEDC). After visiting and discussing force measurement needs and current capabilities at each participating facility as well as selected force measurement companies, a strategic plan was developed to guide future NASA investments. This paper will provide the details of the strategic plan and include asset management, organization and technology research and development investment priorities as well as efforts to date.
[How to expand and improve the coverage of family planning services: a Latin American viewpoint].
Trias, M
1992-12-01
It is probably not possible to implant a family planning program that will have a reasonable demographic impact in areas lacking awareness of the disadvantages of overly high fertility. Rural-urban migration, increasing educational levels, women's labor force participation, and declining infant mortality are all factors that have been found to correlate with demand for family planning services. It has been recognized since the Bucharest World Population Conference in 1974 that development and family planning are both required for the fertility transition to begin. Where these conditions exist, a family planning program appropriate to the needs, limitations, preferences, and expectations of the target population has an excellent chance of success. Expanded and improved coverage results from tailoring programs to the specific groups served. Most programs are directed toward women. It has been found most effective to provide services for men in separate sessions. It is also useful to distinguish between services for adolescents, who require more information and fewer services, for mature women who require more services than information, and for premenopausal women whose needs for information and services are both declining. Contraceptive preferences vary with social class, but family planning programs in developing countries should concentrate on the lower middle and lower classes which comprise 80% of the population. Rural areas and marginal urban areas require special attention. In order to provide services that will attract all potential users, the maximum possible variety of methods should be available. A family planning program offering a variety of methods throughout the country and financially accessible to the population should be successful. Family planning programs, whether public or private, require adequate financial resources and the support or at least tolerance of the government. Knowledge of contraception is now almost universal. A major challenge of family planning programs is to prompt women who say they want to limit their reproduction but who do not practice family planning to adopt a method. Program leadership and interpersonal relations with clients should be competent. The experience of PROFAMILIA in Colombia suggests that charging fees for all services offered by the family planning program is a positive feature allowing the client to avoid feeling like a charity recipient and the program to account for materials and services more easily. Goals and objective indicators stimulate performance and allow progress to be assessed. It is recommended that client education focus on a synthesis of information concerning available methods and provision of somewhat greater detail on the method chosen. Integration of services is usually an enemy of family planning because, despite theoretical advantages, it usually means neglect of family planning in favor of curative care.
An Overview of NASA Engine Ice-Crystal Icing Research
NASA Technical Reports Server (NTRS)
Addy, Harold E., Jr.; Veres, Joseph P.
2011-01-01
Ice accretions that have formed inside gas turbine engines as a result of flight in clouds of high concentrations of ice crystals in the atmosphere have recently been identified as an aviation safety hazard. NASA s Aviation Safety Program (AvSP) has made plans to conduct research in this area to address the hazard. This paper gives an overview of NASA s engine ice-crystal icing research project plans. Included are the rationale, approach, and details of various aspects of NASA s research.
Machine translation project alternatives analysis
NASA Technical Reports Server (NTRS)
Bajis, Catherine J.; Bedford, Denise A. D.
1993-01-01
The Machine Translation Project consists of several components, two of which, the Project Plan and the Requirements Analysis, have already been delivered. The Project Plan details the overall rationale, objectives and time-table for the project as a whole. The Requirements Analysis compares a number of available machine translation systems, their capabilities, possible configurations, and costs. The Alternatives Analysis has resulted in a number of conclusions and recommendations to the NASA STI program concerning the acquisition of specific MT systems and related hardware and software.
Space station common module power system network topology and hardware development
NASA Technical Reports Server (NTRS)
Landis, D. M.
1985-01-01
Candidate power system newtork topologies for the space station common module are defined and developed and the necessary hardware for test and evaluation is provided. Martin Marietta's approach to performing the proposed program is presented. Performance of the tasks described will assure systematic development and evaluation of program results, and will provide the necessary management tools, visibility, and control techniques for performance assessment. The plan is submitted in accordance with the data requirements given and includes a comprehensive task logic flow diagram, time phased manpower requirements, a program milestone schedule, and detailed descriptions of each program task.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schweitzer, M.
1991-01-01
Integrated resource planning differs from traditional utility planning practices primarily in its increased attention to demand-side management (DSM) programs and its integration of supply- and demand-side resources into a combined resource portfolio. This report details the findings from an Oak Ridge National Laboratory (ORNL) survey of 24 electric utilities that have well-developed integrated planning processes. These utilities account for roughly one-third of total capacity, electricity generation, and DSM-program expenditures nationwide. The ORNL survey was designed to obtain descriptive data on a national sample of utilities and to test a number of hypothesized relationships between selected utility characteristics and the mixmore » of resources selected for the integrated plan, with an emphasis on the use of DSM resources and the processes by which they are chosen. The survey solicited information on each utility's current and projected resource mix, operating environment, procedures used to screen potential DSM resources, techniques used to obtain public input and to integrate supply- and demand-side options into a unified plan, and procedures used in the final selection of resources for the plan.« less
Software reuse issues affecting AdaNET
NASA Technical Reports Server (NTRS)
Mcbride, John G.
1989-01-01
The AdaNet program is reviewing its long-term goals and strategies. A significant concern is whether current AdaNet plans adequately address the major strategic issues of software reuse technology. The major reuse issues of providing AdaNet services that should be addressed as part of future AdaNet development are identified and reviewed. Before significant development proceeds, a plan should be developed to resolve the aforementioned issues. This plan should also specify a detailed approach to develop AdaNet. A three phased strategy is recommended. The first phase would consist of requirements analysis and produce an AdaNet system requirements specification. It would consider the requirements of AdaNet in terms of mission needs, commercial realities, and administrative policies affecting development, and the experience of AdaNet and other projects promoting the transfer software engineering technology. Specifically, requirements analysis would be performed to better understand the requirements for AdaNet functions. The second phase would provide a detailed design of the system. The AdaNet should be designed with emphasis on the use of existing technology readily available to the AdaNet program. A number of reuse products are available upon which AdaNet could be based. This would significantly reduce the risk and cost of providing an AdaNet system. Once a design was developed, implementation would proceed in the third phase.
NASA Technical Reports Server (NTRS)
1985-01-01
The results of detailed cost estimates and economic analysis performed on the updated Model 101 configuration of the general purpose Aft Cargo Carrier (ACC) are given. The objective of this economic analysis is to provide the National Aeronautics and Space Administration (NASA) with information on the economics of using the ACC on the Space Transportation System (STS). The detailed cost estimates for the ACC are presented by a work breakdown structure (WBS) to ensure that all elements of cost are considered in the economic analysis and related subsystem trades. Costs reported by WBS provide NASA with a basis for comparing competing designs and provide detailed cost information that can be used to forecast phase C/D planning for new projects or programs derived from preliminary conceptual design studies. The scope covers all STS and STS/ACC launch vehicle cost impacts for delivering payloads to a 160 NM low Earth orbit (LEO).
NASA Technical Reports Server (NTRS)
1985-01-01
Results of detailed cost estimates and economic analysis performed on the updated 201 configuration of the dedicated Aft Cargo Carrier (DACC) are given. The objective of this economic analysis is to provide the National Aeronautics and Space Administration (NASA) with information on the economics of using the DACC on the Space Transportation System (STS). The detailed cost estimates for the DACC are presented by a work breakdown structure (WBS) to ensure that all elements of cost are considered in the economic analysis and related subsystem trades. Costs reported by WBS provide NASA with a basis for comparing competing designs and provide detailed cost information that can be used to forecast phase C/D planning for new projects or programs derived from preliminary conceptual design studies. The scope covers all STS and STS/DACC launch vehicle cost impacts for delivering an orbital transfer vehicle to a 120 NM low Earth orbit (LEO).
2005-08-01
QSAR in Environmental Researth was accepted and published in April of 2005. The manuscript described the cat -SAR program in detail. We note the...analysis of this data yielded a very good model. As such, this was a suitable dataset on which to develop and test the cat -SAR program. A copy of the...developed and validated (i.e., a-c) as planned in MCASE and then with the cat -SAR program. We have also updated rodent carcinogenicity models so that
Physics of the Cosmos Program Annual Technology Report
NASA Technical Reports Server (NTRS)
Pham, Bruce Thai; Cardiff, Ann H.
2015-01-01
What's in this Report? What's New? This fifth Program Annual Technology Report (PATR) summarizes the Programs technology development activities for fiscal year (FY) 2015. The PATR serves four purposes.1. Summarize the technology gaps identified by the astrophysics community;2. Present the results of this years technology gap prioritization by the PCOS Technology Management Board (TMB);3. Report on newly funded PCOS Strategic Astrophysics Technology (SAT) projects; and4. Detail progress, current status, and activities planned for the coming year for all technologies supported by PCOS Supporting Research and Technology (SRT) funding in FY 2015. .
Space Station Freedom - Approaching the critical design phase
NASA Technical Reports Server (NTRS)
Kohrs, Richard H.; Huckins, Earle, III
1992-01-01
The status and future developments of the Space Station Freedom are discussed. To date detailed design drawings are being produced to manufacture SSF hardware. A critical design review (CDR) for the man-tended capability configuration is planned to be performed in 1993 under the SSF program. The main objective of the CDR is to enable the program to make a full commitment to proceed to manufacture parts and assemblies. NASA recently signed a contract with the Russian space company, NPO Energia, to evaluate potential applications of various Russian space hardware for on-going NASA programs.
A decision framework for coordinating bioterrorism planning: lessons from the BioNet program.
Manley, Dawn K; Bravata, Dena M
2009-01-01
Effective disaster preparedness requires coordination across multiple organizations. This article describes a detailed framework developed through the BioNet program to facilitate coordination of bioterrorism preparedness planning among military and civilian decision makers. The authors and colleagues conducted a series of semistructured interviews with civilian and military decision makers from public health, emergency management, hazardous material response, law enforcement, and military health in the San Diego area. Decision makers used a software tool that simulated a hypothetical anthrax attack, which allowed them to assess the effects of a variety of response actions (eg, issuing warnings to the public, establishing prophylaxis distribution centers) on performance metrics. From these interviews, the authors characterized the information sources, technologies, plans, and communication channels that would be used for bioterrorism planning and responses. The authors used influence diagram notation to describe the key bioterrorism response decisions, the probabilistic factors affecting these decisions, and the response outcomes. The authors present an overview of the response framework and provide a detailed assessment of two key phases of the decision-making process: (1) pre-event planning and investment and (2) incident characterization and initial responsive measures. The framework enables planners to articulate current conditions; identify gaps in existing policies, technologies, information resources, and relationships with other response organizations; and explore the implications of potential system enhancements. Use of this framework could help decision makers execute a locally coordinated response by identifying the critical cues of a potential bioterrorism event, the information needed to make effective response decisions, and the potential effects of various decision alternatives.
Kuroda, Takeshi; Tanabe, Naohito; Kobayashi, Daisuke; Sato, Hiroe; Wada, Yoko; Murakami, Shuichi; Sakatsume, Minoru; Nakano, Masaaki; Narita, Ichiei
2011-09-01
Reactive amyloidosis is a serious systemic disease in rheumatoid arthritis (RA). Amyloid protein can be deposited in kidneys, heart or gastrointestinal tract leading to organ failure. Renal involvement is a well-known complication in amyloidosis as this may culminate in end-stage renal disease (ESRD). Hemodialysis (HD) is always considered the treatment of choice for such patients; however, the prognosis is usually poor due to a large number of sudden deaths immediately following HD therapy. To circumvent the problem of HD initiation while instituting HD safety, we devised a plan to start HD and compare patient's survival with our previous data. Sixty-three patients were treated with HD. They were categorized according to the initiation of first dialysis. All patients were divided into planned, unplanned and programmed initiation groups. First dialysis that had been initiated as not urgent was considered 'planned' (20 patients). First dialysis that had been performed urgently for life-threatening renal insufficiency was considered 'unplanned' (31 patients). First dialysis that had been initiated as not urgent and according to our dialysis program was considered 'programmed' (12 patients). Survival of these 63 patients from the initiation of HD at 38 days was 75%, at 321 days was 50% and at 1,784 days was 25%. Patients with unplanned initiation of HD showed a significant poor survival compared with those of both planned and programmed initiation. Additionally, patients with planned and programmed initiation of HD showed no significant difference for the patients' survival. Our study demonstrates that patients with amyloidosis have a higher mortality rate. Nevertheless, programmed initiation of HD will improve the prognosis of patients with ESRD. Such possibility needs to be considered in more detail in the future.
Liu, M; Wei, L; Zhang, J
2006-01-01
Missing data in clinical trials are inevitable. We highlight the ICH guidelines and CPMP points to consider on missing data. Specifically, we outline how we should consider missing data issues when designing, planning and conducting studies to minimize missing data impact. We also go beyond the coverage of the above two documents, provide a more detailed review of the basic concepts of missing data and frequently used terminologies, and examples of the typical missing data mechanism, and discuss technical details and literature for several frequently used statistical methods and associated software. Finally, we provide a case study where the principles outlined in this paper are applied to one clinical program at protocol design, data analysis plan and other stages of a clinical trial.
NASA Astrophysics Data System (ADS)
Fish, Philip E.
1995-05-01
In 1978, Wisconsin Department of Transportation discovered major cracking on a two-girder, fracture critical structure, just four years after it was constructed. In 1981, on the same structure, now seven years old, major cracking was discovered in the tie girder flange of the tied arch span. This is one example of the type of failures that transportation departments discovered on welded structures in the 1970's and '80's. The failures from welded details and pinned connections lead to much stricter standards for present day designs. All areas were affected: design with identification of fatigue-prone details and classification of fatigue categories; material requirements with emphasis on toughness and weldability; increased welding and fabrication standards with licensure of fabrication shops to minimum quality standards including personnel; and an increased effort on inspection of existing bridges, where critical details were overlooked or missed in the past. FHWA inspection requirements for existing structures increased through this same time period, in reaction to the failures that had occurred. Obviously, many structures in Wisconsin were not built to the standards now required, thus the importance for quality inspection techniques. The new FHWA inspection requirements now being implemented throughout the nation require an in-depth, hands-on type inspection at a specified frequency, on all fracture critical structures. Wisconsin Department of Transportation started an in-depth inspection program in 1985 and made it a full time program in 1987. This program included extensive nondestructive testing. Ultrasonic inspection has played a major role in this type of inspection. All fracture critical structures, pin and hanger systems, and pinned connections are inspected on a five-year cycle now. The program requires an experienced inspection team and a practical inspection approach. Extensive preparation is required with review of all design, construction, and maintenance documents. An inspection plan is developed from the review and downloaded to a laptop computer. Inspection emphasis are on 'hands on' visual and nondestructive evaluation. Report documentation includes all design plans, pictorial documentation of structural deficiencies, nondestructive evaluation reports, conclusions, and recommendations. Planned changes in the program include implementation of an engineering work station as a 'single source' information file and reporting file for the inspection program. This would include scanning all current information into the file such as design, construction, and maintenance history. It would also include all inspection data with pictures. Inspections would be performed by downloading data onto a laptop and then uploading after completion of inspection. Pictures and nondestructive data would be entered by digital disks.
The Shock and Vibration Digest. Volume 13, Number 4
1981-04-01
Brazil to find and develop their offshore oil resources. Much detailed planning and organization have gone into this program . Given as background in...summer program is a specially developed course of study which is based on two regular MIT subjects (one graduate level and one undergraduate level...Seal on an HTGR Core Subjected to Seianic Support Motions A. Chuang General Atomic Co., San Diego, CA, ASME Paper No. 80-C2/PVP-21 Key Words
Failure mode analysis to predict product reliability.
NASA Technical Reports Server (NTRS)
Zemanick, P. P.
1972-01-01
The failure mode analysis (FMA) is described as a design tool to predict and improve product reliability. The objectives of the failure mode analysis are presented as they influence component design, configuration selection, the product test program, the quality assurance plan, and engineering analysis priorities. The detailed mechanics of performing a failure mode analysis are discussed, including one suggested format. Some practical difficulties of implementation are indicated, drawn from experience with preparing FMAs on the nuclear rocket engine program.
ERIC Educational Resources Information Center
Sclafane, Jamie Heather
2013-01-01
Dialogue journaling is a technique that is useful for enhancing the goals of sexual health promotion and HIV/STI prevention programs with 14-to 17-year-old at-risk youth. Included is a detailed lesson plan on how to implement dialogue journaling in this context, a discussion of advantages and concerns about using them, and future implications for…
Field support activity aerospace manpower transfer to small business enterprises
NASA Technical Reports Server (NTRS)
Green, M. K.
1972-01-01
This report reiterates the major findings of the original study on the utilization of unemployed aerospace professionals in small businesses, and also provides a definition of three programs which, as a result of this study and other research into this problem, offer great potential in providing for better utilization of the nation's technically trained personal and technology resources. Details of these three programs are provided along with a recommended plan of action for their implementation.
Developing a Competency-Based Curriculum for a Dental Hygiene Program.
ERIC Educational Resources Information Center
DeWald, Janice P.; McCann, Ann L.
1999-01-01
Describes the three-step process used to develop a competency-based curriculum at the Caruth School of Dental Hygiene (Texas A&M University). The process involved development of a competency document (detailing three domains, nine major competencies, and 54 supporting competencies), an evaluation plan, and a curriculum inventory which defined…
The Preservation and Restoration of Paper Records and Books: A RAMP Study with Guidelines.
ERIC Educational Resources Information Center
Crespo, Carmen; Vinas, Vicente
Intended for archivists and librarians, especially in developing countries, this study details the systems and principles important in planning and implementing a program for the preservation and restoration of paper documents and books. The importance of environmental (external) causes and effects of paper deterioration are discussed as well as…
ERIC Educational Resources Information Center
Steeb, Ralph V.
The guide describes procedures for designing secondary industrial arts facilities based on careful scrutiny of the educational program which the facilities are intended to serve. It offers a four step general outline for planning such facilities and discusses in detail the following considerations with respect to writing subject area…
Flight test and evaluation of Omega navigation in a general aviation aircraft. Volume 2: Appendices
NASA Technical Reports Server (NTRS)
Howell, J. D.; Hoffman, W. C.; Hwoschinsky, P. V.; Wischmeyer, C. E.
1975-01-01
Detailed documentation for each flight of the Omega Flight Evaluation study is presented, including flight test description sheets and actual flight data plots. Computer programs used for data processing and flight planning are explained and the data formats utilized by the Custom Interface Unit are summarized.
2017-05-25
the planning process. Current US Army doctrine links conceptual planning to the Army Design Methodology and detailed planning to the Military...Decision Making Process. By associating conceptual and detailed planning with doctrinal methodologies , it is easy to regard the transition as a set period...plans into detailed directives resulting in changes to the operational environment. 15. SUBJECT TERMS Design; Army Design Methodology ; Conceptual
NASA Technical Reports Server (NTRS)
Bilstein, R. E.
1974-01-01
Management of the Saturn launch vehicles was an evolutionary process, requiring constant interaction between NASA Headquarters, the Marshall Space Flight Center (particularly the Saturn 5 Program Office), and the various prime contractors. Successful Saturn management was a blend of the decades of experience of the von Braun team, management concepts from the Army, Navy, Air Force, and Government, and private industry. The Saturn 5 Program Office shared a unique relationship with the Apollo Program Office at NASA Headquarters. Much of the success of the Saturn 5 Program Office was based on its painstaking attention to detail, emphasis on individual responsibilities (backed up by comprehensive program element plans and management matrices), and a high degree of visibility as embodied in the Program Control Center.
A comprehensive plan for helicopter drag reduction
NASA Technical Reports Server (NTRS)
Williams, R. M.; Montana, P. S.
1975-01-01
Current helicopters have parasite drag levels 6 to 10 times as great as fixed wing aircraft. The commensurate poor cruise efficiency results in a substantial degradation of potential mission capability. The paper traces the origins of helicopter drag and shows that the problem (primarily due to bluff body flow separation) can be solved by the adoption of a comprehensive research and development plan. This plan, known as the Fuselage Design Methodology, comprises both nonaerodynamic and aerodynamic aspects. The aerodynamics are discussed in detail and experimental and analytical programs are described which will lead to a solution of the bluff body problem. Some recent results of work conducted at the Naval Ship Research and Development Center (NSRDC) are presented to illustrate these programs. It is concluded that a 75-per cent reduction of helicopter drag is possible by the full implementation of the Fuselage Design Methodology.
Planning Multitechnology Access Networks with Performance Constraints
NASA Astrophysics Data System (ADS)
Chamberland, Steven
Considering the number of access network technologies and the investment needed for the “last mile” of a solution, in today’s highly competitive markets, planning tools are crucial for the service providers to optimize the network costs and accelerate the planning process. In this paper, we propose to tackle the problem of planning access networks composed of four technologies/architectures: the digital subscriber line (xDSL) technologies deployed directly from the central office (CO), the fiber-to-the-node (FTTN), the fiber-to-the-micro-node (FTTn) and the fiber-to-the-premises (FTTP). A mathematical programming model is proposed for this planning problem that is solved using a commercial implementation of the branch-and-bound algorithm. Next, a detailed access network planning example is presented followed by a systematic set of experiments designed to assess the performance of the proposed approach.
The 2017 Total Solar Eclipse: Through the Eyes of NASA
NASA Astrophysics Data System (ADS)
Mayo, Louis; NASA Goddard Heliophysics Education Consortium
2017-10-01
The August 21st, 2017 Total Solar Eclipse Across America provided a unique opportunity to teach event-based science to nationwide audiences. NASA spent over three years planning space and Earth science education programs for informal audiences, undergraduate institutions, and life long learners to bring this celestial event to the public through the eyes of NASA. This talk outlines how NASA used its unique assets including mission scientists and engineers, space based assets, citizen science, educational technology, science visualization, and its wealth of science and technology partners to bring the eclipse to the country through multimedia, cross-discipline science activities, curricula, and media programing. Audience reach, impact, and lessons learned are detailed. Plans for similar events in 2018 and beyond are outlined.
A Feasible Approach for an Early Manned Lunar Landing. Part II: Detailed Report of Ad Hoc Task Group
NASA Technical Reports Server (NTRS)
Fleming, William A.
1961-01-01
This report, in two parts, presents a program development plan for attempting a first manned lunar landing in 1967. The two parts consist of a Summary Report and a Detailed Report representing the coordinated output of the Ad Hoc Task Group assigned to the study. The study was started in response to the request for such a study by the Associate Administrator in his memorandum of May 2, 1961 establishing the Ad Hoc Task Group. The purpose of the study was to take a first cut at the tasks associated with the design, development and construction of the equipment and facilities as well as the development of the crews, and to show the time phasing 6f these tasks. Included are the space sciences, life science and advanced technology tasks whose data and results are needed for designing and developing the systems required in carrying out the mission. The plan presented in the two reports does not presume to be a firm plan. Its basic purpose is, by choosing one feasible method, to size up the scope, schedule and cost of the job, discover the main problems, pacing items and major decisions and provide a threshold from which a firm and detailed project development plan can be jointly formulated by the various elements of NASA.
NASA Technical Reports Server (NTRS)
Miller, Edward F.; Heyward, Ann O.; Ponchak, Denise S.; Spence, Rodney L.; Whyte, Wayne A., Jr.
1987-01-01
The authors describe a two-phase approach to allotment planning suitable for use in planning the fixed satellite service at the 1988 Space World Administrative radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common to groups of administrations and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the conference. Computer software has been developed to implement the concepts, and the logic and rationale for identifying predetermined arc segments is discussed. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.
Space Station Mission Planning Study (MPS) development study. Volume 3: Software development plan
NASA Technical Reports Server (NTRS)
Klus, W. L.
1987-01-01
A software development plan is presented for the definition, design, and implementation of the Space Station (SS) Payload Mission Planning System (MPS). This plan is an evolving document and must be updated periodically as the SS design and operations concepts as well as the SS MPS concept evolve. The major segments of this plan are as follows: an overview of the SS MPS and a description of its required capabilities including the computer programs identified as configurable items with an explanation of the place and function of each within the system; an overview of the project plan and a detailed description of each development project activity breaking each into lower level tasks where applicable; identification of the resources required and recommendations for the manner in which they should be utilized including recommended schedules and estimated manpower requirements; and a description of the practices, standards, and techniques recommended for the SS MPS Software (SW) development.
Operation of the Institute for Computer Applications in Science and Engineering
NASA Technical Reports Server (NTRS)
1975-01-01
The ICASE research program is described in detail; it consists of four major categories: (1) efficient use of vector and parallel computers, with particular emphasis on the CDC STAR-100; (2) numerical analysis, with particular emphasis on the development and analysis of basic numerical algorithms; (3) analysis and planning of large-scale software systems; and (4) computational research in engineering and the natural sciences, with particular emphasis on fluid dynamics. The work in each of these areas is described in detail; other activities are discussed, a prognosis of future activities are included.
Developing an educational safety program for pharmacy employees.
Hayman, J N
1980-02-01
The need for developing educational safety programs for pharmacy employees is discussed. A three-part program is offered as a guide for structuring a departmental safety program. Part I deals with environmental hazards such as wet floors, poor lighting, and cluttered walk areas. Precautions that should be taken to avoid accidental exposure to patients with communicable diseases are also included. Hazards that may result from improper handling of materials or equipment are addressed in Part II. Included are precautions for handling chemicals, needles, ladders, and electrical equipment. Proper methods of lifting heavy objects are also discussed. Part III details plans to protect staff members in the event of a fire. Plans for reporting fires and evacuating the pharmacy and hospital are discussed. The outlined program requires self-study by staff members during initial employee orientation, followed by annual retraining. Employees are tested and graded on safety topics, and training records are filed for future reference. The program outlined is thought to offer a simple yet effective means of acquainting staff members with established institutional and departmental safety procedures.
The use of tacit and explicit knowledge in public health: a qualitative study
2012-01-01
Background Planning a public health initiative is both a science and an art. Public health practitioners work in a complex, often time-constrained environment, where formal research literature can be unavailable or uncertain. Consequently, public health practitioners often draw upon other forms of knowledge. Methods Through use of one-on-one interviews and focus groups, we aimed to gain a better understanding of how tacit knowledge is used to inform program initiatives in public health. This study was designed as a narrative inquiry, which is based on the assumption that we make sense of the world by telling stories. Four public health units were purposively selected for maximum variation, based on geography and academic affiliation. Results Analysis revealed different ways in which tacit knowledge was used to plan the public health program or initiative, including discovering the opportunity, bringing a team together, and working out program details (such as partnering, funding). Conclusions The findings of this study demonstrate that tacit knowledge is drawn upon, and embedded within, various stages of the process of program planning in public health. The results will be useful in guiding the development of future knowledge translation strategies for public health organizations and decision makers. PMID:22433980
NASA's Microgravity Fluid Physics Strategic Research Roadmap
NASA Technical Reports Server (NTRS)
Motil, Brian J.; Singh, Bhim S.
2004-01-01
The Microgravity Fluid Physics Program at NASA has developed a substantial investigator base engaging a broad crosssection of the U.S. scientific community. As a result, it enjoys a rich history of many significant scientific achievements. The research supported by the program has produced many important findings that have been published in prestigious journals such as Science, Nature, Journal of Fluid Mechanics, Physics of Fluids, and many others. The focus of the program so far has primarily been on fundamental scientific studies. However, a recent shift in emphasis at NASA to develop advanced technologies to enable future exploration of space has provided motivation to add a strategic research component to the program. This has set into motion a year of intense planning within NASA including three workshops to solicit inputs from the external scientific community. The planning activities and the workshops have resulted in a prioritized list of strategic research issues along with a corresponding detailed roadmap specific to fluid physics. The results of these activities were provided to NASA s Office of Biological and Physical Research (OBPR) to support the development of the Enterprise Strategy document. This paper summarizes these results while showing how the planned research supports NASA s overall vision through OBPR s organizing questions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goodman, P.S.
The report examines the feasibility of employee-assistance plans for the coal industry. Three issues are examined in detail. First, the prevalence of off-the-job factors such as alcoholism, drug abuse, and marital problems are examined in a sample of miners from the eastern, midwestern, and western underground coalfields. Then, data are presented from examination of the link between these off-the-job factors and behaviors critical to the mines such as absenteeism and turnover. Lastly, the effectiveness of the major employee-assistance program in underground coal mining - the HELP Program was examined. The report contains recommendations on whether coal-mining companies should implement thesemore » programs and how these programs should be designed.« less
Apollo experience report: Electronic systems test program accomplishments and results
NASA Technical Reports Server (NTRS)
Ohnesorge, T. E.
1972-01-01
A chronological record is presented of the Electronic Systems Test Program from its conception in May 1963 to December 1969. The original concept of the program, which was primarily a spacecraft/Manned Space Flight Network communications system compatibility and performance evaluation, is described. The evolution of these concepts to include various levels of test detail, as well as systems level design verification testing, is discussed. Actual implementation of these concepts is presented, and the facility to support the program is described. Test results are given, and significant contributions to the lunar landing mission are underlined. Plans for modifying the facility and the concepts, based on Apollo experience, are proposed.
Revisit, revamp and revitalize your business plan: Part 4.
Waldron, David
2011-01-01
A best practice for all imaging leaders working on a management development program should be to invest enough time to complete a detailed planthatsetsgoals, objectives, step targets, landmarks, and a timetable for their achievements. Keys to success for a management development program include no surprises, active participation, and preparation by both the facilitator and the managers involved. A successful management team will have trained staff and lean processes mapped and documented, as well as be comfortable in a coaching, delegating, and consensus management style.
Nickel-hydrogen separator development
NASA Technical Reports Server (NTRS)
Gonzalez-Sanabria, O. D.
1986-01-01
The separator technology is a critical element in the nickel-hydrogen (Ni-H2) systems. Previous research and development work carried out at NASA Lewis Research Center has determined that separators made from zirconium oxide (ZrO2) and potassium titanate (PKT) fibers will function satisfactorily in Ni-H2 cells without exhibiting the problems associated with the asbestos separators. A program has been established to transfer the separator technology into a commercial production line. A detailed plan of this program will be presented and the preliminary results will be discussed.
Research in advanced formal theorem-proving techniques
NASA Technical Reports Server (NTRS)
Rulifson, J. F.
1971-01-01
The present status is summarized of a continuing research program aimed at the design and implementation of a language for expressing problem-solving procedures in several areas of artificial intelligence, including program synthesis, robot planning, and theorem proving. Notations, concepts, and procedures common to the representation and solution of many of these problems were abstracted and incorporated as features into the language. The areas of research covered are described, and abstracts of six papers that contain extensive description and technical detail of the work are presented.
(Collaboration for improved understanding of implanted ceramics)
DOE Office of Scientific and Technical Information (OSTI.GOV)
McHargue, C.J.
1990-04-09
The visit to the University Claude Bernard was to analyze data obtained there and at ORNL in a collaborative research program, to exchange samples, to plan further work, and to prepare drafts of two manuscripts for publication. The traveler also attended a meeting of the organizers of a NATO-ASI entitled Diamond and Diamond-Like Films and Coatings'' that will be held in Italy in July--August 1990. The purpose of this organizing meeting was to establish the program and other organization details.
Development of a verification program for deployable truss advanced technology
NASA Technical Reports Server (NTRS)
Dyer, Jack E.
1988-01-01
Use of large deployable space structures to satisfy the growth demands of space systems is contingent upon reducing the associated risks that pervade many related technical disciplines. The overall objectives of this program was to develop a detailed plan to verify deployable truss advanced technology applicable to future large space structures and to develop a preliminary design of a deployable truss reflector/beam structure for use a a technology demonstration test article. The planning is based on a Shuttle flight experiment program using deployable 5 and 15 meter aperture tetrahedral truss reflections and a 20 m long deployable truss beam structure. The plan addresses validation of analytical methods, the degree to which ground testing adequately simulates flight and in-space testing requirements for large precision antenna designs. Based on an assessment of future NASA and DOD space system requirements, the program was developed to verify four critical technology areas: deployment, shape accuracy and control, pointing and alignment, and articulation and maneuvers. The flight experiment technology verification objectives can be met using two shuttle flights with the total experiment integrated on a single Shuttle Test Experiment Platform (STEP) and a Mission Peculiar Experiment Support Structure (MPESS). First flight of the experiment can be achieved 60 months after go-ahead with a total program duration of 90 months.
Early career professional development issues for military academic psychiatrists.
Warner, Christopher H; Bobo, William V; Flynn, Julianne
2005-01-01
Academically motivated graduates of military psychiatric residency programs confront serious challenges. In this article, the authors present a junior faculty development model organized around four overlapping domains: mentorship, scholarship, research, and career planning/development. Using these four domains as a platform for discussion, the authors focus on challenges facing academically oriented early-career military psychiatrists and provide guidance. The authors believe that a proactive stance, skillful mentoring, self-awareness through conscious planning and effort, ability to capitalize on existing opportunities for growth, and attention to detail are all vital to the junior military psychiatrist.
West Valley demonstration project: Implementation of the kerosene mitigation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blickwedehl, R.R.; Goodman, J.; Valenti, P.J.
1987-05-01
An aggressive program was implemented to mitigate the migration of radioactive kerosene believed to have originated from the West Valley NRC-Licensed Disposal Area (NDA) disposal trenches designated as SH-10 and SH-11 (Special Holes 10 and 11). This report provides a historical background of the events leading to the migration problem, the results of a detailed investigation to determine the location and source of the kerosene migration, the remediation plan to mitigate the migration, and the actions taken to successfully stabilize the kerosene. 7 refs., 19 figs., 1 tab.
Campbell, N R; Jeffrey, P; Kiss, K; Jones, C; Anton, A R
2001-12-01
In 1995, the Calgary Fire Department developed a program to assess blood pressure in community fire stations, selected businesses and public venues. The program has gradually expanded. Currently, all 30 fire stations across Calgary, Alberta assess blood pressures for the public seven days per week throughout the year. Since 1995, there have been 10,883 measurements in 3477 people. Most people (2106) assessed had hypertensive readings, and 72 had readings greater than 220 mmHg systolic or greater than 120 mmHg diastolic, and were referred for immediate medical assessment. The program has been recently integrated into a more global vision for the prevention and control of cardiovascular disease in Calgary. Future plans include offering lipid assessments, assisting other communities to adopt the program and using the program to provide physical measures (of blood pressure, glucose, total and high density lipoprotein cholesterol, height and weight) to an ongoing questionnaire that surveys the health of Calgarians. The history of the program, its training methods, quality control, preliminary results and future plans are presented in detail to provide an example of a community-based program that could aid in the detection, monitoring and awareness of hypertension.
Program for Arctic Regional Climate Assessment (PARCA)
NASA Technical Reports Server (NTRS)
Gogineni, Sivaprasad; Thomas, Robert H.; Abdalati, Waleed (Editor)
1999-01-01
The Program for Arctic Regional Climate Assessment (PARCA) is a NASA-sponsored initiative with the prime objective of understanding the mass balance of the Greenland ice sheet. In October 1998, PARCA investigators met to review activities of the previous year, assess the program's progress, and plan future investigations directed at accomplishing that objective. Some exciting results were presented and discussed, including evidence of dramatic thinning of the ice sheet near the southeastern coast. Details of the investigations and many of the accomplishments are given in this report, but major highlights are given in the Executive Summary of the report.
Report of Programme Commission II (Natural Sciences).
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Paris (France). General Conference.
As the first part of the report of the Programme Commission II, a summary of discussions on plans for natural sciences and their applications is presented in this document. The two agenda items are: (1) detailed consideration of the 1973-74 draft program and budget and of the 1973-78 draft medium-term outline, and (2) desirability of adopting an…
ERIC Educational Resources Information Center
Carnegie, John W.
This lesson deals with special considerations that should be made when choosing a sludge solids management program, briefly describing the source of solids in wastewater and why they must be dealt with. The various solids handling processes and ultimate disposal methods are also briefly described, followed by a detailed discussion of the technical…
Get Connected to School-to-Career: A Quick Guide for Organized Labor.
ERIC Educational Resources Information Center
New Ways to Work, San Francisco, CA.
This document explains how organized labor can participate in school-to-career programs across California. The guide begins by detailing the following steps for becoming involved in school-to-career: (1) plan your strategy; (2) choose your activities; and (3) get connected. The following topics are discussed next: (1) principles and benefits of…
ERIC Educational Resources Information Center
Stokes, Leah C.; Mildenberger, Matto; Savan, Beth; Kolenda, Brian
2012-01-01
Conducting a barriers analysis is an important first step when designing proenvironmental behavior change interventions. Yet, detailed information on common barriers to energy conservation campaigns remains unavailable. Using a pair of original surveys, we leverage the theory of planned behavior to report on the most important barriers for…
ERIC Educational Resources Information Center
Beasley, Kenneth L.; And Others
Designed as a standard reference and training resource for administrators and project managers, this handbook discusses how to plan, organize, and manage sponsored projects in any organizational setting. It provides detailed, how-to-do-it information and many resources for: negotiating grants, awards, and contracts; organizing a sponsored projects…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-11
... Fair Housing; (4) Capacity Building and Knowledge Sharing; (5) Using Housing as a Platform for Improving Other Outcomes; and (6) Expanding Cross-Cutting Policy Knowledge. Detailed information on HUD's Strategic Plan for FY2010-2015 is available at: http://portal.hud.gov/portal/page/portal/HUD/program_offices...
ERIC Educational Resources Information Center
Illinois State Office of the Superintendent of Public Instruction, Springfield.
THE INFORMATION INCLUDED IN THIS VERY DETAILED DOCUMENT IS INTENDED FOR TEACHERS AND ADMINISTRATORS PLANNING AND IMPLEMENTING PROGRAMS TO IMPROVE FOREIGN LANGUAGE INSTRUCTION. THE SPECIFICATIONS PRESENTED ARE MINIMUM, BUT THEY MEET THE REQUIREMENTS UNDER THE PROVISIONS OF TITLE III, NDEA. THE FIRST PART OUTLINES PROCEDURES FOR THE SELECTION AND…
A Collaborative Effort at Marketing the University: Detailing a Student-Centered Approach
ERIC Educational Resources Information Center
Washburn, Judith H.; Petroshius, Susan M.
2004-01-01
In this article, the authors describe the use of an experiential team-based project in a capstone marketing management course. In the project, students worked with the university administration to develop a marketing plan for the Admissions Office's Tour Guide Program. The authors discuss why such marketing activities are important to colleges and…
ERIC Educational Resources Information Center
Wholeben, Brent E.
This volume is an exposition of a mathematical modeling technique for use in the evaluation and solution of complex educational problems at all levels. It explores in detail the application of simple algebraic techniques to such issues as program reduction, fiscal rollbacks, and computer curriculum planning. Part I ("Introduction to the…
ERIC Educational Resources Information Center
Bast, Lotus S.; Due, Pernille; Ersbøll, Annette K.; Damsgaard, Mogens T.; Andersen, Anette
2017-01-01
Background: Assessment of implementation is essential for the evaluation of school-based preventive activities. Interventions are more easily implemented in schools if detailed instructional manuals, lesson plans, and materials are provided; however, implementation may also be affected by other factors than the intervention itself--for example,…
Shark Bite Meetings for Creative Program Planning
ERIC Educational Resources Information Center
Pellien, Tamara; Yergeau, Steven
2017-01-01
The strength of Cooperative Extension lies in the breadth of knowledge and experience of its faculty and staff. Yet those working in Extension can get so bogged down by the weight of this knowledge and become so focused on details, ownership, and process that it can be hard to respond to emerging needs or work effectively as a group. "Shark…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Waddell, Lucas; Muldoon, Frank; Henry, Stephen Michael
In order to effectively plan the management and modernization of their large and diverse fleets of vehicles, Program Executive Office Ground Combat Systems (PEO GCS) and Program Executive Office Combat Support and Combat Service Support (PEO CS&CSS) commis- sioned the development of a large-scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This paper contains a thor-more » ough documentation of the terminology, parameters, variables, and constraints that comprise the fleet management mixed integer linear programming (MILP) mathematical formulation. This paper, which is an update to the original CPAT formulation document published in 2015 (SAND2015-3487), covers the formulation of important new CPAT features.« less
Transportation Institutional Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader'smore » convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.« less
NASA Technical Reports Server (NTRS)
Miller, Edward F.; Heyward, Ann O.; Ponchak, Denise S.; Spence, Rodney L.; Whyte, Wayne A., Jr.; Zuzek, John E.
1987-01-01
Described is a two-phase approach to allotment planning suitable for use in establishing the fixed satellite service at the 1988 Space World Administrative Radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common togroups of administrations, and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the confernece. Computer software has been developed to implement the concepts, and a complete discussion on the logic and rationale for identifying predetermined arc segments is given. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees in practice equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhou, Y; Tan, J; Jiang, S
Purpose: Plan specific quality assurance (QA) is an important step in high dose rate (HDR) brachytherapy to ensure the integrity of a treatment plan. The conventional approach is to assemble a set of plan screen-captures in a document and have an independent plan-checker to verify it. Not only is this approach cumbersome and time-consuming, using a document also limits the items that can be verified, hindering plan quality and patient safety. We have initiated efforts to develop a web-based HDR brachytherapy QA system called AutoBrachy QA, for comprehensive and efficient QA. This abstract reports a new plugin in this systemmore » for the QA of a cylinder HDR brachytherapy treatment. Methods: A cylinder plan QA module was developed using Python. It was plugged into our AutoBrachy QA system. This module extracted information from CT images and treatment plan. Image processing techniques were employed to obtain geometric parameters, e.g. cylinder diameter. A comprehensive set of eight geometrical and eight dosimetric features of the plan were validated against user specified planning parameter, such as prescription value, treatment depth and length, etc. A PDF document was generated, consisting of a summary QA sheet with all the QA results, as well as images showing plan details. Results: The cylinder QA program has been implemented in our clinic. To date, it has been used in 11 patient cases and was able to successfully perform QA tests in all of them. The QA program reduced the average plan QA time from 7 min using conventional manual approach to 0.5 min. Conclusion: Being a new module in our AutoBrachy QA system, an automated treatment plan QA module for cylinder HDR brachytherapy has been successfully developed and clinically implemented. This module improved clinical workflow and plan integrity compared to the conventional manual approach.« less
Quality-assurance plan for water-resources activities of the U.S. Geological Survey in Idaho
Packard, F.A.
1996-01-01
To ensure continued confidence in its products, the Water Resources Division of the U.S. Geological Survey implemented a policy that all its scientific work be performed in accordance with a centrally managed quality-assurance program. This report establishes and documents a formal policy for current (1995) quality assurance within the Idaho District of the U.S. Geological Survey. Quality assurance is formalized by describing district organization and operational responsibilities, documenting the district quality-assurance policies, and describing district functions. The districts conducts its work through offices in Boise, Idaho Falls, Twin Falls, Sandpoint, and at the Idaho National Engineering Laboratory. Data-collection programs and interpretive studies are conducted by two operating units, and operational and technical assistance is provided by three support units: (1) Administrative Services advisors provide guidance on various personnel issues and budget functions, (2) computer and reports advisors provide guidance in their fields, and (3) discipline specialists provide technical advice and assistance to the district and to chiefs of various projects. The district's quality-assurance plan is based on an overall policy that provides a framework for defining the precision and accuracy of collected data. The plan is supported by a series of quality-assurance policy statements that describe responsibilities for specific operations in the district's program. The operations are program planning; project planning; project implementation; review and remediation; data collection; equipment calibration and maintenance; data processing and storage; data analysis, synthesis, and interpretation; report preparation and processing; and training. Activities of the district are systematically conducted under a hierarchy of supervision an management that is designed to ensure conformance with Water Resources Division goals quality assurance. The district quality-assurance plan does not describe detailed technical activities that are commonly termed "quality-control procedures." Instead, it focuses on current policies, operations, and responsibilities that are implemented at the management level. Contents of the plan will be reviewed annually and updated as programs and operations change.
Final Design for a Comprehensive Orbital Debris Management Program
NASA Technical Reports Server (NTRS)
1990-01-01
The rationale and specifics for the design of a comprehensive program for the control of orbital debris, as well as details of the various components of the overall plan, are described. The problem of orbital debris has been steadily worsening since the first successful launch in 1957. The hazards posed by orbital debris suggest the need for a progressive plan for the prevention of future debris, as well as the reduction of the current debris level. The proposed debris management plan includes debris removal systems and preventative techniques and policies. The debris removal is directed at improving the current debris environment. Because of the variance in sizes of debris, a single system cannot reasonably remove all kinds of debris. An active removal system, which deliberately retrieves targeted debris from known orbits, was determined to be effective in the disposal of debris tracked directly from earth. However, no effective system is currently available to remove the untrackable debris. The debris program is intended to protect the orbital environment from future abuses. This portion of the plan involves various environment from future abuses. This portion of the plan involves various methods and rules for future prevention of debris. The preventative techniques are protective methods that can be used in future design of payloads. The prevention policies are rules which should be employed to force the prevention of orbital debris.
Evaluation plan for state gas heating system retrofit pilot programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berry, L.; Vineyard, T.
This report presents a detailed plan for the evaluation of state gas heating system retrofit pilot programs. The major goals of the evaluation procedures are to document the fuel savings and cost effectiveness of (1) the programs implemented by the states and (2) the four retrofit types installed. The major tasks involved in the evaluation include identification of program-eligible households, screening for data quality, assignment of eligible households to treatment or control groups, assembling cost data, collecting pre- and postretrofit consumption data, obtainin pre- and postretrofit weather data, checking for data quality, and analyzing the data. Data analysis relies onmore » the calculation of weather-adjusted normalized annual consumption (NAC) figures for pre- and postretrofit years for treatment and control groups. The differences between the treatment and control groups' NACs for the pre- and postretrofit years are the measure of the program's impact. Cost effectiveness analysis will combine the NAC results with cost data and with a variety of assumptions concerning future fuel prices, retrofit lifetimes, and discount rates to produce benefit/cost indicators.« less
Joliet Junior College and the 2015 International Year of Light's Cosmic Light Theme
NASA Astrophysics Data System (ADS)
D'Cruz, Noella L.
2015-01-01
We teach "Descriptive Astronomy" and "Life in the Universe" courses for non-science majors at Joliet Junior College, Joliet IL. We also occasionally present planetarium shows at the college's planetarium. In 2015, we plan to highlight the "Cosmic Light" theme of the 2015 International Year of Light through some of our teaching and outreach activities. For several years, together with our students, we have participated in the Globe at Night light pollution program. In 2015, we plan to continue our participation in this program and we will continue to encourage our students to participate on their own from other locations. We will present a live planetarium show on Light Pollution in Spring 2015 as part of the college's Brown Bag Lecture Series. We plan to develop and present one or two live planetarium presentations that focus on studying astronomical objects across the electromagnetic spectrum during 2015. Also in Spring 2015, we plan to include projects that highlight the International Year of Light in our Descriptive Astronomy course offerings. Our poster will provide details of these "Cosmic Light" activities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted “active” status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells grantedmore » “inactive” status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans.« less
Test, Control and Monitor System (TCMS) operations plan
NASA Technical Reports Server (NTRS)
Macfarlane, C. K.; Conroy, M. P.
1993-01-01
The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.
NASA Technical Reports Server (NTRS)
Harper, Richard E.; Babikyan, Carol A.; Butler, Bryan P.; Clasen, Robert J.; Harris, Chris H.; Lala, Jaynarayan H.; Masotto, Thomas K.; Nagle, Gail A.; Prizant, Mark J.; Treadwell, Steven
1994-01-01
The Army Avionics Research and Development Activity (AVRADA) is pursuing programs that would enable effective and efficient management of large amounts of situational data that occurs during tactical rotorcraft missions. The Computer Aided Low Altitude Night Helicopter Flight Program has identified automated Terrain Following/Terrain Avoidance, Nap of the Earth (TF/TA, NOE) operation as key enabling technology for advanced tactical rotorcraft to enhance mission survivability and mission effectiveness. The processing of critical information at low altitudes with short reaction times is life-critical and mission-critical necessitating an ultra-reliable/high throughput computing platform for dependable service for flight control, fusion of sensor data, route planning, near-field/far-field navigation, and obstacle avoidance operations. To address these needs the Army Fault Tolerant Architecture (AFTA) is being designed and developed. This computer system is based upon the Fault Tolerant Parallel Processor (FTPP) developed by Charles Stark Draper Labs (CSDL). AFTA is hard real-time, Byzantine, fault-tolerant parallel processor which is programmed in the ADA language. This document describes the results of the Detailed Design (Phase 2 and 3 of a 3-year project) of the AFTA development. This document contains detailed descriptions of the program objectives, the TF/TA NOE application requirements, architecture, hardware design, operating systems design, systems performance measurements and analytical models.
Control of Technology Transfer at JPL
NASA Technical Reports Server (NTRS)
Oliver, Ronald
2006-01-01
Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software
Drezner, Jonathan A; Rao, Ashwin L; Heistand, Justin; Bloomingdale, Megan K; Harmon, Kimberly G
2009-08-11
US high schools are increasingly adopting automated external defibrillators (AEDs) for use in campus settings. We analyzed the effectiveness of emergency response planning for sudden cardiac arrest (SCA) in a large cohort of US high schools that had onsite AED programs. A cohort of US high schools with at least 1 onsite AED was identified from the National Registry for AED Use in Sports. A school representative completed a comprehensive survey on emergency planning and provided details of any SCA incident occurring within 6 months of survey completion. Surveys were completed between December 2006 and July 2007. In total, 1710 high schools with an onsite AED program were studied. Although 83% (1428 of 1710) of schools have an established emergency response plan for SCA, only 40% practice and review the plan at least annually with potential school responders. A case of SCA was reported by 36 of 1710 schools (2.1%). The 36 SCA victims included 14 high school student athletes (mean age, 16 years; range, 14 to 17 years) and 22 older nonstudents (mean age, 57 years; range, 42 to 71 years) such as employees and spectators. No cases were reported in student nonathletes. Of the 36 SCA cases, 35 (97%) were witnessed, 34 (94%) received bystander cardiopulmonary resuscitation, and 30 (83%) received an AED shock. Twenty-three SCA victims (64%) survived to hospital discharge, including 9 of the 14 student athletes and 14 of the 22 older nonstudents. School-based AED programs provide a high survival rate for both student athletes and older nonstudents who suffer SCA on school grounds. High schools are strongly encouraged to implement onsite AED programs as part of a comprehensive emergency response plan to SCA.
ERIC Educational Resources Information Center
Witt, Mary Allison
2011-01-01
The increasing connection among higher education institutions worldwide is well documented. What is less understood is how this connectivity is enacted and manifested on specific levels of the global education network. This book details the planning process of a multi-institutional program in engineering between institutions in the US and…
Evolution of Technical Writing in Senior Design--A Case History
ERIC Educational Resources Information Center
Gnanapragasam, Nirmala
2010-01-01
Seattle University has an industrially sponsored, yearlong, senior design program that has been in existence for more than 20 years. Students work in teams of three or four under the guidance of a liaison from the sponsoring agency and a faculty advisor. The students prepare a proposal in the fall quarter detailing their plan and a design report…
Education Tax Credits in a Post-"Zelman" Era: Legal, Political, and Policy Alternatives to Vouchers?
ERIC Educational Resources Information Center
Huerta, Luis A.; d'Entremont, Chad
2007-01-01
This article examines an emerging preference for education tax credit programs in a post-"Zelman" era. First, the authors detail the origin of tax credits and the types of existing plans. Second, they review the assumptions underlying the supposed advantages that may favor tax credits as a feasible alternative to vouchers. Third, they…
ERIC Educational Resources Information Center
Quintyne, Susan
This curriculum project is designed for high school classes in Spanish, social studies, or global studies. The project's lesson plan lists materials needed; poses seven key questions about Mexico and Monterrey; outlines background notes on Mexico; and provides a detailed, step-by-step procedure for classroom implementation during three days. Also…
NASA Technical Reports Server (NTRS)
Chien, Andrew A.; Karamcheti, Vijay; Plevyak, John; Sahrawat, Deepak
1993-01-01
Concurrent object-oriented languages, particularly fine-grained approaches, reduce the difficulty of large scale concurrent programming by providing modularity through encapsulation while exposing large degrees of concurrency. Despite these programmability advantages, such languages have historically suffered from poor efficiency. This paper describes the Concert project whose goal is to develop portable, efficient implementations of fine-grained concurrent object-oriented languages. Our approach incorporates aggressive program analysis and program transformation with careful information management at every stage from the compiler to the runtime system. The paper discusses the basic elements of the Concert approach along with a description of the potential payoffs. Initial performance results and specific plans for system development are also detailed.
JWST Telescope Integration and Test Progress
NASA Technical Reports Server (NTRS)
Matthews, Gary W.; Whitman, Tony L.; Feinberg, Lee D.; Voyton, Mark F.; Lander, Juli A.; Keski-Kuha, Ritva
2016-01-01
The James Webb Space Telescope (JWST) is a 6.5m, segmented, IR telescope that will explore the first light of the universe after the big bang. The JWST Optical Telescope Element (Telescope) integration and test program is well underway. The telescope was completed in the spring of 2016 and the cryogenic test equipment has been through two optical test programs leading up to the final flight verification program. The details of the telescope mirror integration will be provided along with the current status of the flight observatory. In addition, the results of the two optical ground support equipment cryo tests will be shown and how these plans fold into the flight verification program.
Figures of Merit for Aeronautics Programs and Addition to NASA LARC Fire Station
NASA Technical Reports Server (NTRS)
Harper, Belinda M.
1995-01-01
This report accounts details of two research projects for the Langley Aerospace Research Summer Scholars (LARSS) program. The first project, with the Office of Mission Assurance, involved subjectively predicting the probable success of two aeronautics programs by means of a tool called a Figure of Merit. The figure of merit bases program success on the quality and reliability of the following factors: parts, complexity of research, quality programs, hazards elimination, and single point failures elimination. The second project, for the Office of Safety and Facilities Assurance, required planning, layouts, and source seeking for an addition to the fire house. Forecasted changes in facility layout necessitate this addition which will serve as housing for the fire fighters.
Nickel-hydrogen separator development
NASA Technical Reports Server (NTRS)
Gonzalez-Sanabria, O. D.
1986-01-01
The separator technology is a critical element in the nickel-hydrogen (Ni-H2) systems. Previous research and development work carried out at NASA Lewis Research Center has determined that separators made from zirconium oxide (ZrO2) and potassium titanate (PKT) fibers will function satisfactorily in Ni-H2 cells without exhibiting the problems associated with the asbestos separators. These separators and their characteristics were previously discussed. A program was established to transfer the separator technology into a commercial production line. A detailed plan of this program will be presented and the preliminary results will be discussed.
NASA Technical Reports Server (NTRS)
Chavez, Patrick F.
1987-01-01
The effort at Sandia National Labs. on the methodologies and techniques being used to generate strict hexahedral finite element meshes from a solid model is described. The functionality of the modeler is used to decompose the solid into a set of nonintersecting meshable finite element primitives. The description of the decomposition is exported, via a Boundary Representative format, to the meshing program which uses the information for complete finite element model specification. Particular features of the program are discussed in some detail along with future plans for development which includes automation of the decomposition using artificial intelligence techniques.
SouthWest Elevation, Plan Showing Deck Framing, Deck Plan, Plan of ...
South-West Elevation, Plan Showing Deck Framing, Deck Plan, Plan of Collar Beams, Etc., Typical Framing Details, End Elevations, Elevation of Scarf Top Chord, Joint Details - Perrine's Bridge, Spanning Wallkill River, Rifton, Ulster County, NY
Summary appraisals of the Nation's ground-water resources; Great Basin region
Eakin, Thomas E.; Price, Don; Harrill, J.R.
1976-01-01
Only a few areas of the Great Basin Region have been studied in detail sufficient to enable adequate design of an areawide groundwater development. These areas already have been developed. As of 1973 data for broadly outlining the ground-water resources of the region had been obtained. However, if large-scale planned development is to become a reality, a program for obtaining adequate hydrologic and related data would be a prerequisite. Ideally, the data should be obtained in time to be available for the successively more intensive levels of planning required to implement developments.
Agreement on FY 1990 budget plan
NASA Astrophysics Data System (ADS)
The Bush administration has reached agreement with congressional leaders over a thumbnail version of the Fiscal Year 1990 budget. The plan contains few details but could have implications for NASA's Space Station Freedom and other big science projects.Overall, the budget agreement would achieve Gramm-Rudman-Hollings targets for budget deficit reduction without raising taxes, mostly through accounting manipulation and unspecified cuts in social programs. But a supplemental bill that calls for $1.2 billion in new spending for FY 1989 is expected to go to the House floor soon. That measure would violate the new agreement and add to the deficit.
Hanford Site Groundwater Protection Management Program: Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Groundwater protection is a national priority that is promulgated in a variety of environmental regulations at local, state, and federal levels. To effectively coordinate and ensure compliance with applicable regulations, the US Department of Energy has issued DOE Order 5400.1 (now under revision) that requires all US Department of Energy facilities to prepare separate groundwater protection program descriptions and plans. This document describes the Groundwater Protection Management Program for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the Groundwater Protection Management Program cover the following general topical areas: (1) documentation of the groundwater regime,more » (2) design and implementation of a groundwater monitoring program to support resource management and comply with applicable laws and regulations, (3) a management program for groundwater protection and remediation, (4) a summary and identification of areas that may be contaminated with hazardous waste, (5) strategies for controlling these sources, (6) a remedial action program, and (7) decontamination and decommissioning and related remedial action requirements. Many of the above elements are covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing groundwater protection activities. Additionally, it describes how information needs are identified and can be incorporated into existing or proposed new programs. The Groundwater Protection Management Program provides the general scope, philosophy, and strategies for groundwater protection/management at the Hanford Site. Subtier documents provide the detailed plans for implementing groundwater-related activities and programs. Related schedule and budget information are provided in the 5-year plan for environmental restoration and waste management at the Hanford Site.« less
Pointing and control system enabling technology for future automated space missions
NASA Technical Reports Server (NTRS)
Dahlgren, J. B.
1978-01-01
Future automated space missions present challenging opportunities in the pointing-and-control technology disciplines. The enabling pointing-and-control system technologies for missions from 1985 to the year 2000 were identified and assessed. A generic mission set including Earth orbiter, planetary, and other missions which predominantly drive the pointing-and-control requirements was selected for detailed evaluation. Technology candidates identified were prioritized as planning options for future NASA-OAST advanced development programs. The primary technology thrusts in each candidate program were cited, and advanced development programs in pointing-and-control were recommended for the FY 80 to FY 87 period, based on these technology thrusts.
Introduction to Computational Methods for Stability and Control (COMSAC)
NASA Technical Reports Server (NTRS)
Hall, Robert M.; Fremaux, C. Michael; Chambers, Joseph R.
2004-01-01
This Symposium is intended to bring together the often distinct cultures of the Stability and Control (S&C) community and the Computational Fluid Dynamics (CFD) community. The COMSAC program is itself a new effort by NASA Langley to accelerate the application of high end CFD methodologies to the demanding job of predicting stability and control characteristics of aircraft. This talk is intended to set the stage for needing a program like COMSAC. It is not intended to give details of the program itself. The topics include: 1) S&C Challenges; 2) Aero prediction methodology; 3) CFD applications; 4) NASA COMSAC planning; 5) Objectives of symposium; and 6) Closing remarks.
Ten Hoor, G A; Kok, G; Rutten, G M; Ruiter, R A C; Kremers, S P J; Schols, A M J W; Plasqui, G
2016-06-10
Overweight youngsters are better in absolute strength exercises than their normal-weight counterparts; a physiological phenomenon with promising psychological impact. In this paper we describe the study protocol of the Dutch, school-based program 'Focus on Strength' that aims to improve body composition of 11-13 year old students, and with that to ultimately improve their quality of life. The development of this intervention is based on the Intervention Mapping (IM) protocol, which starts from a needs assessment, uses theory and empirical research to develop a detailed intervention plan, and anticipates program implementation and evaluation. This novel intervention targets first year students in preparatory secondary vocational education (11-13 years of age). Teachers are the program implementers. One part of the intervention involves a 30 % increase of strength exercises in the physical education lessons. The other part is based on Motivational Interviewing, promoting autonomous motivation of students to become more physically active outside school. Performance and change objectives are described for both teachers and students. The effectiveness of the intervention will be tested in a Randomized Controlled Trial in 9 Dutch high schools. Intervention Mapping is a useful framework for program planning a school-based program to improve body composition and motivation to exercise in 11-13 year old adolescents by a "Focus on Strength". NTR5676 , registered 8 February 2016 (retrospectively registered).
40 CFR 35.917-4 - Planning scope and detail.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Planning scope and detail. 35.917-4... Planning scope and detail. (a) Initially, the geographic scope of step 1 grant assistance shall be based on... Regional Administrator may make the preliminary delineation of the boundaries of the planning area, if the...
NASA Astrophysics Data System (ADS)
Levia, Delphis
2013-04-01
The achievement of sustainable use of our natural world is one of the major issues confronting humankind today. Environmental issues are inherently complex and difficult to resolve. Successful resolution of our most pressing environmental problems, such as climate change and ocean acidification, will require well-trained earth and environmental scientists that think critically in a multi-dimensional framework at variable spatial and temporal scales. This begs the question as to how we can both attract and successfully educate students in such a way that will permit them to tackle the multitude of environmental problems currently facing society. This poster details one way to successfully attract and train students in an interdisciplinary environmental education framework by sharing: (1) some of the successful strategies and programmatic structure of the University of Delaware's undergraduate environmental programs that have grown over 60% in two years after a major programmatic revision; and (2) the current round of programmatic revisions that will complete the strategic planning process.* The interdisciplinary environmental education program at the University of Delaware has a strong programmatic core that provides students with the requisite quantitative training and field experience to solve complicated environmental issues. At the same time, the environmental program includes the social, political, and economic contexts of environmental issues. Together, these two parts of the core best equip students to mitigate environmental problems. Following a strategic planning effort, the University of Delaware is building upon past successes in training environmental scientists and managers by further reformulating its environmental programs to leverage the power of theme-based learning which complements the programmatic core in such a way to teach problem-solving skills. This poster details the multidimensional nature of the University of Delaware's environmental programs and the revised program structure that seeks to strike a balance between quantitative science, adaptive management, and solutions oriented thinking. ------------------------ *Please note that the planning process for the environmental programs was and is the collective effort of many dedicated people. Current members of the advisory Environmental Council include Drs. Delphis Levia (Program Director), Nancy Targett (Dean and Council Chair), Frank Newton, Tracy Deliberty, Tom Sims, John Madsen, Paul Imhoff, Jan Johnson, Jerry Kauffman, Murray Johnston.
Designing cost effective water demand management programs in Australia.
White, S B; Fane, S A
2002-01-01
This paper describes recent experience with integrated resource planning (IRP) and the application of least cost planning (LCP) for the evaluation of demand management strategies in urban water. Two Australian case studies, Sydney and Northern New South Wales (NSW) are used in illustration. LCP can determine the most cost effective means of providing water services or alternatively the cheapest forms of water conservation. LCP contrasts to a traditional approach of evaluation which looks only at means of increasing supply. Detailed investigation of water usage, known as end-use analysis, is required for LCP. End-use analysis allows both rigorous demand forecasting, and the development and evaluation of conservation strategies. Strategies include education campaigns, increasing water use efficiency and promoting wastewater reuse or rainwater tanks. The optimal mix of conservation strategies and conventional capacity expansion is identified based on levelised unit cost. IRP uses LCP in the iterative process, evaluating and assessing options, investing in selected options, measuring the results, and then re-evaluating options. Key to this process is the design of cost effective demand management programs. IRP however includes a range of parameters beyond least economic cost in the planning process and program designs, including uncertainty, benefit partitioning and implementation considerations.
Environmental restoration and waste management five year plan, fiscal years 1994--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a bottom up'' approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ``bottom up`` approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE`s commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE`s environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less
Design and Status of RERTR Irradiation Tests in the Advanced Test Reactor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Daniel M. Wachs; Richard G. Ambrosek; Gray Chang
2006-10-01
Irradiation testing of U-Mo based fuels is the central component of the Reduced Enrichment for Research and Test Reactors (RERTR) program fuel qualification plan. Several RERTR tests have recently been completed or are planned for irradiation in the Advanced Test Reactor (ATR) located at the Idaho National Laboratory in Idaho Falls, ID. Four mini-plate experiments in various stages of completion are described in detail, including the irradiation test design, objectives, and irradiation conditions. Observations made during and after the in-reactor RERTR-7A experiment breach are summarized. The irradiation experiment design and planned irradiation conditions for full-size plate test are described. Progressmore » toward element testing will be reviewed.« less
NASA Technical Reports Server (NTRS)
Hanley, G. M.
1980-01-01
The latest technical and programmatic developments are considered as well as expansions of the Rockwell SPS cost model covering each phase of the program through the year 2030. Comparative cost/economic analyses cover elements of the satellite, construction system, space transportation vehicles and operations, and the ground receiving station. System plans to define time phased costs and planning requirements that support major milestones through the year 2000. A special analysis is included on natural resources required to build the SPS reference configuration. An appendix contains the SPS Work Breakdown Structure and dictionary along with detail cost data sheet on each system and main element of the program. Over 200 line items address DDT&E, theoretical first unit, investment cost per satellite, and operations charges for replacement capital and normal operations and maintenance costs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bretzke, John C.
The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed tomore » a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.« less
Key issues and technical route of cyber physical distribution system
NASA Astrophysics Data System (ADS)
Zheng, P. X.; Chen, B.; Zheng, L. J.; Zhang, G. L.; Fan, Y. L.; Pei, T.
2017-01-01
Relying on the National High Technology Research and Development Program, this paper introduced the key issues in Cyber Physical Distribution System (CPDS), mainly includes: composite modelling method and interaction mechanism, system planning method, security defence technology, distributed control theory. Then on this basis, the corresponding technical route is proposed, and a more detailed research framework along with main schemes to be adopted is also presented.
ERIC Educational Resources Information Center
Iowa Department of Education, 2006
2006-01-01
This report provides an overview of the efforts of Iowa's community colleges to train workers for the emerging bioscience/biotechnology sector. The report explains the programs available and the future plans of individual community colleges designed to educate students for careers in the biosciences. Also detailed are a variety of creative…
Space construction system analysis. Part 2: Cost and programmatics
NASA Technical Reports Server (NTRS)
Vonflue, F. W.; Cooper, W.
1980-01-01
Cost and programmatic elements of the space construction systems analysis study are discussed. The programmatic aspects of the ETVP program define a comprehensive plan for the development of a space platform, the construction system, and the space shuttle operations/logistics requirements. The cost analysis identified significant items of cost on ETVP development, ground, and flight segments, and detailed the items of space construction equipment and operations.
The Tunable XUV Imager (TXI) Sounding Rocket Payload
NASA Technical Reports Server (NTRS)
Brinton, John (Technical Monitor); Golub, Leon
2004-01-01
The TXI was flown successfully on 21 June 2001 (36.199 US). All systems functioned as planned and image data were acquired and sent to the ground. Unfortunately, due to a parachute failure the payload was destroyed. In this report we summarize results from the flight and provide detailed information on the high resolution X-ray imaging detector which was developed as part of the program.
NASA Astrophysics Data System (ADS)
Shaner, A. J.; Kring, D. A.
2015-12-01
To be competitive in 21st century science and exploration careers, graduate students in planetary science and related disciplines need mentorship and need to develop skills not always available at their home university, including fieldwork, mission planning, and communicating with others in the scientific and engineering communities in the U.S. and internationally. Programs offered by the Lunar and Planetary Institute (LPI) address these needs through summer internships and field training programs. From 2008-2012, LPI hosted the Lunar Exploration Summer Intern Program. This special summer intern program evaluated possible landing sites for robotic and human exploration missions to the lunar surface. By the end of the 2012 program, a series of scientifically-rich landing sites emerged, some of which had never been considered before. Beginning in 2015 and building on the success of the lunar exploration program, a new Exploration Science Summer Intern Program is being implemented with a broader scope that includes both the Moon and near-Earth asteroids. Like its predecessor, the Exploration Science Summer Intern Program offers graduate students a unique opportunity to integrate scientific input with exploration activities in a way that mission architects and spacecraft engineers can use. The program's activities may involve assessments and traverse plans for a particular destination or a more general assessment of a class of possible exploration targets. Details of the results of these programs will be discussed. Since 2010 graduate students have participated in field training and research programs at Barringer (Meteor) Crater and the Sudbury Impact Structure. Skills developed during these programs prepare students for their own thesis studies in impact-cratered terrains, whether they are on the Earth, the Moon, Mars, or other solar system planetary surface. Future field excursions will take place at these sites as well as the Zuni-Bandera Volcanic Field. Skills developed during the Zuni-Bandera training will prepare students for their own thesis studies of volcanic provinces on any solar system planetary surface where basaltic volcanism has occurred. Further details of these field trainings will also be discussed.
NASA advanced cryocooler technology development program
NASA Astrophysics Data System (ADS)
Coulter, Daniel R.; Ross, Ronald G., Jr.; Boyle, Robert F.; Key, R. W.
2003-03-01
Mechanical cryocoolers represent a significant enabling technology for NASA's Earth and Space Science Enterprises. Over the years, NASA has developed new cryocooler technologies for a wide variety of space missions. Recent achievements include the NCS, AIRS, TES and HIRDLS cryocoolers, and miniature pulse tube coolers at TRW and Lockheed Martin. The largest technology push within NASA right now is in the temperature range of 4 to 10 K. Missions such as the Next Generation Space Telescope (NGST) and Terrestrial Planet Finder (TPF) plan to use infrared detectors operating between 6-8 K, typically arsenic-doped silicon arrays, with IR telescopes from 3 to 6 meters in diameter. Similarly, Constellation-X plans to use X-ray microcalorimeters operating at 50 mK and will require ~6 K cooling to precool its multistage 50 mK magnetic refrigerator. To address cryocooler development for these next-generation missions, NASA has initiated a program referred to as the Advanced Cryocooler Technology Development Program (ACTDP). This paper presents an overview of the ACTDP program including programmatic objectives and timelines, and conceptual details of the cooler concepts under development.
NASA Astrophysics Data System (ADS)
Westfall, Catherine
2018-03-01
This is the second in a three-part article describing the development of the Thomas Jefferson National Accelerator Facility's experimental program, from the first dreams of incisive electromagnetic probes into the structure of the nucleus through the era in which equipment was designed and constructed and a program crafted so that the long-desired experiments could begin. These developments unfolded against the backdrop of the rise of the more bureaucratic New Big Science and the intellectual tumult that grew from increasing understanding and interest in quark-level physics. Part 2, presented here, focuses on the period from 1986 to 1990. During this period of revolutionary change, laboratory personnel, potential users, and DOE officials labored to proceed from the 1986 laboratory design report, which included detailed accelerator plans and very preliminary experimental equipment sketches, to an approved 1990 experimental equipment conceptual design report, which provided designs complete enough for the onset of experimental equipment construction.
Space life sciences strategic plan
NASA Astrophysics Data System (ADS)
Nicogossian, Arnauld E.
1992-05-01
Over the last three decades the Life Sciences Program has significantly contributed to NASA's manned and unmanned exploration of space, while acquiring new knowledge in the fields of space biology and medicine. The national and international events which have led to the development and revision of NASA strategy will significantly affect the future of life sciences programs both in scope and pace. This document serves as the basis for synthesizing the options to be pursued during the next decade, based on the decisions, evolution, and guiding principles of the National Space Policy. The strategies detailed in this document are fully supportive of the Life Sciences Advisory Subcommittee's 'A Rationale for the Life Sciences,' and the recent Aerospace Medicine Advisory Committee report entitled 'Strategic Considerations for Support of Humans in Space and Moon/Mars Exploration Missions.' Information contained within this document is intended for internal NASA planning and is subject to policy decisions and direction, and to budgets allocated to NASA's Life Sciences Program.
Space life sciences strategic plan
NASA Technical Reports Server (NTRS)
Nicogossian, Arnauld E.
1992-01-01
Over the last three decades the Life Sciences Program has significantly contributed to NASA's manned and unmanned exploration of space, while acquiring new knowledge in the fields of space biology and medicine. The national and international events which have led to the development and revision of NASA strategy will significantly affect the future of life sciences programs both in scope and pace. This document serves as the basis for synthesizing the options to be pursued during the next decade, based on the decisions, evolution, and guiding principles of the National Space Policy. The strategies detailed in this document are fully supportive of the Life Sciences Advisory Subcommittee's 'A Rationale for the Life Sciences,' and the recent Aerospace Medicine Advisory Committee report entitled 'Strategic Considerations for Support of Humans in Space and Moon/Mars Exploration Missions.' Information contained within this document is intended for internal NASA planning and is subject to policy decisions and direction, and to budgets allocated to NASA's Life Sciences Program.
Research And Development Contributions to Aviation Progress (RADCAP): Executive summary
NASA Technical Reports Server (NTRS)
1972-01-01
Positive contributions of military aeronautical research and development programs to civil aviation are reviewed and some possible future contributions of those military programs are assessed. A summary is presented of detailed results concerned with: (1) review of the progress that has been made in aviation since 1925 and the significant technological advances that have been made; (2) an examination of current and planned military aeronautical research and technology programs and an assessment of their relevancy to the aeronautical R and D needs of civil aviation; (3) the relationship of the development base generated by military programs to the needs of civil airliner design, development, and production; (4) information on aeronautical R and D funding; and (5) the findings and observations of the RADCAP study.
The U.S. National Plan for Civil Earth Observations
NASA Astrophysics Data System (ADS)
Stryker, T.; Clavin, C.; Gallo, J.
2014-12-01
Globally, the United Sates Government is one of the largest providers of environmental and Earth-system data. As the nation's Earth observation capacity has grown, so have the complexity and challenges associated with managing Earth observation systems and related data holdings. In July 2014, the White House Office of Science and Technology Policy released the first-ever National Plan for Civil Earth Observations to address these challenges. The Plan provides a portfolio management-based framework for maximizing the value of Federal Earth observations. The Plan identifies Federal priorities for Earth observations and improved management of their data. Through routine assessments, expanding data management efforts, interagency planning, and international collaboration, OSTP and its partner agencies will seek ensure the continued provision of and access to key Earth observation data, which support a broad range of public services and research programs. The presenters will provide a detailed review of the components of the National Plan, its impacts across the Federal agencies involved in Earth observations, and associated efforts to enable interagency coordination.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-08-01
During the first half of fiscal year 1995, most activities at the Yucca Mountain Site Characterization Project were directed at implementing the Program Plan developed by the Office of Civilian Radioactive Waste Management. The Plan is designed to enable the Office to make measurable and significant progress toward key objectives over the next five years within the financial resources that can be realistically expected. Activities this period focused on the immediate goal of determining by 1998 whether Yucca Mountain, Nevada, is technically suitable as a possible site for a geologic repository for the permanent disposal of spent nuclear fuel andmore » high-level radioactive waste. Work on the Project advanced in several critical areas, including programmatic activities such as issuing the Program Plan, completing the first technical basis report to support the assessment of three 10 CFR 960 guidelines, developing the Notice of Intent for the Environmental Impact Statement, submitting the License Application Annotated Outline, and beginning a rebaselining effort to conform with the goals of the Program Plan. Scientific investigation and analysis of the site and design and construction activities to support the evaluation of the technical suitability of the site also advanced. Specific details relating to all Project activities and reports generated are presented in this report.« less
Oak Ridge reservation land-use plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bibb, W. R.; Hardin, T. H.; Hawkins, C. C.
1980-03-01
This study establishes a basis for long-range land-use planning to accommodate both present and projected DOE program requirements in Oak Ridge. In addition to technological requirements, this land-use plan incorporates in-depth ecological concepts that recognize multiple uses of land as a viable option. Neither environmental research nor technological operations need to be mutually exclusive in all instances. Unique biological areas, as well as rare and endangered species, need to be protected, and human and environmental health and safety must be maintained. The plan is based on the concept that the primary use of DOE land resources must be to implementmore » the overall DOE mission in Oak Ridge. This document, along with the base map and overlay maps, provides a reasonably detailed description of the DOE Oak Ridge land resources and of the current and potential uses of the land. A description of the land characteristics, including geomorphology, agricultural productivity and soils, water courses, vegetation, and terrestrial and aquatic animal habitats, is presented to serve as a resource document. Essentially all DOE land in the Oak Ridge area is being fully used for ongoing DOE programs or has been set aside as protected areas.« less
SEDAC data and applications development plan V(1)
NASA Technical Reports Server (NTRS)
Chen, Robert S. (Compiler)
1995-01-01
This Data and Applications Development Plan describes how the Socioeconomic Data and Applications Center (SEDAC) at the Consortium for International Earth Science Information Network (CIESIN) is responding to SEDAC's mission to develop new applications and information products that synthesize earth science and socioeconomic data in ways that support decision making. The SEDAC data and applications development effort is a primary means by which the Earth Observing System Data and Information System (EOSDIS) program can help to ensure that the scientific investment embodied in NASA's Mission to Planet Earth (MTPE) program leads to tangible benefits to the American people. The Plan describes the major issues concerned with global climate change, identifies important decision makers and other users who would benefit from improved data and information, and assesses key opportunities for responding to the needs of these users and the scientists who work with them. It then details specific plans for developing selected integrated data products and services and for making them available to the target users on an operational basis. This report provides a summary of the activities performed in connection with NASA/GSFC Letter Contract NAS5-3263 for the period shown.
Simic, Vladimir; Dimitrijevic, Branka
2015-02-01
An interval linear programming approach is used to formulate and comprehensively test a model for optimal long-term planning of vehicle recycling in the Republic of Serbia. The proposed model is applied to a numerical case study: a 4-year planning horizon (2013-2016) is considered, three legislative cases and three scrap metal price trends are analysed, availability of final destinations for sorted waste flows is explored. Potential and applicability of the developed model are fully illustrated. Detailed insights on profitability and eco-efficiency of the projected contemporary equipped vehicle recycling factory are presented. The influences of the ordinance on the management of end-of-life vehicles in the Republic of Serbia on the vehicle hulks procuring, sorting generated material fractions, sorted waste allocation and sorted metals allocation decisions are thoroughly examined. The validity of the waste management strategy for the period 2010-2019 is tested. The formulated model can create optimal plans for procuring vehicle hulks, sorting generated material fractions, allocating sorted waste flows and allocating sorted metals. Obtained results are valuable for supporting the construction and/or modernisation process of a vehicle recycling system in the Republic of Serbia. © The Author(s) 2015.
NASA Technical Reports Server (NTRS)
Maldague, Pierre; Page, Dennis; Chase, Adam
2005-01-01
Activity Plan Generator (APGEN), now at version 5.0, is a computer program that assists in generating an integrated plan of activities for a spacecraft mission that does not oversubscribe spacecraft and ground resources. APGEN generates an interactive display, through which the user can easily create or modify the plan. The display summarizes the plan by means of a time line, whereon each activity is represented by a bar stretched between its beginning and ending times. Activities can be added, deleted, and modified via simple mouse and keyboard actions. The use of resources can be viewed on resource graphs. Resource and activity constraints can be checked. Types of activities, resources, and constraints are defined by simple text files, which the user can modify. In one of two modes of operation, APGEN acts as a planning expert assistant, displaying the plan and identifying problems in the plan. The user is in charge of creating and modifying the plan. In the other mode, APGEN automatically creates a plan that does not oversubscribe resources. The user can then manually modify the plan. APGEN is designed to interact with other software that generates sequences of timed commands for implementing details of planned activities.
Single- and dual-carrier microwave noise abatement in the deep space network. [microwave antennas
NASA Technical Reports Server (NTRS)
Bathker, D. A.; Brown, D. W.; Petty, S. M.
1975-01-01
The NASA/JPL Deep Space Network (DSN) microwave ground antenna systems are presented which simultaneously uplink very high power S-band signals while receiving very low level S- and X-band downlinks. Tertiary mechanisms associated with elements give rise to self-interference in the forms of broadband noise burst and coherent intermodulation products. A long-term program to reduce or eliminate both forms of interference is described in detail. Two DSN antennas were subjected to extensive interference testing and practical cleanup program; the initial performance, modification details, and final performance achieved at several planned stages are discussed. Test equipment and field procedures found useful in locating interference sources are discussed. Practices deemed necessary for interference-free operations in the DSN are described. Much of the specific information given is expected to be easily generalized for application in a variety of similar installations. Recommendations for future investigations and individual element design are given.
NASA Technical Reports Server (NTRS)
Leibfried, T. F., Jr.; Davari, Sadegh; Natarajan, Swami; Zhao, Wei
1992-01-01
Two categories were chosen for study: the issue of using a preprocessor on Ada code of Application Programs which would interface with the Run-Time Object Data Base Standard Services (RODB STSV), the intent was to catch and correct any mis-registration errors of the program coder between the user declared Objects, their types, their addresses, and the corresponding RODB definitions; and RODB STSV Performance Issues and Identification of Problems with the planned methods for accessing Primitive Object Attributes, this included the study of an alternate storage scheme to the 'store objects by attribute' scheme in the current design of the RODB. The study resulted in essentially three separate documents, an interpretation of the system requirements, an assessment of the preliminary design, and a detailing of the components of a detailed design.
NASA Astrophysics Data System (ADS)
Yu, Yang; Zeng, Zheng
2009-10-01
By discussing the causes behind the high amendments ratio in the implementation of urban regulatory detailed plans in China despite its law-ensured status, the study aims to reconcile conflict between the legal authority of regulatory detailed planning and the insufficient scientific support in its decision-making and compilation by introducing into the process spatial analysis based on GIS technology and 3D modeling thus present a more scientific and flexible approach to regulatory detailed planning in China. The study first points out that the current compilation process of urban regulatory detailed plan in China employs mainly an empirical approach which renders it constantly subjected to amendments; the study then discusses the need and current utilization of GIS in the Chinese system and proposes the framework of a GIS-assisted 3D spatial analysis process from the designer's perspective which can be regarded as an alternating processes between the descriptive codes and physical design in the compilation of regulatory detailed planning. With a case study of the processes and results from the application of the framework, the paper concludes that the proposed framework can be an effective instrument which provides more rationality, flexibility and thus more efficiency to the compilation and decision-making process of urban regulatory detailed plan in China.
Maintaining consistency between planning hierarchies: Techniques and applications
NASA Technical Reports Server (NTRS)
Zoch, David R.
1987-01-01
In many planning and scheduling environments, it is desirable to be able to view and manipulate plans at different levels of abstraction, allowing the users the option of viewing and manipulating either a very detailed representation of the plan or a high-level more abstract version of the plan. Generating a detailed plan from a more abstract plan requires domain-specific planning/scheduling knowledge; the reverse process of generating a high-level plan from a detailed plan Reverse Plan Maintenance, or RPM) requires having the system remember the actions it took based on its domain-specific knowledge and its reasons for taking those actions. This reverse plan maintenance process is described as implemented in a specific planning and scheduling tool, The Mission Operations Planning Assistant (MOPA), as well as the applications of RPM to other planning and scheduling problems; emphasizing the knowledge that is needed to maintain the correspondence between the different hierarchical planning levels.
Autonomous power management and distribution
NASA Technical Reports Server (NTRS)
Dolce, Jim; Kish, Jim
1990-01-01
The goal of the Autonomous Power System program is to develop and apply intelligent problem solving and control to the Space Station Freedom's electric power testbed being developed at NASA's Lewis Research Center. Objectives are to establish artificial intelligence technology paths, craft knowledge-based tools and products for power systems, and integrate knowledge-based and conventional controllers. This program represents a joint effort between the Space Station and Office of Aeronautics and Space Technology to develop and demonstrate space electric power automation technology capable of: (1) detection and classification of system operating status, (2) diagnosis of failure causes, and (3) cooperative problem solving for power scheduling and failure recovery. Program details, status, and plans will be presented.
Incident reporting: Its role in aviation safety and the acquisition of human error data
NASA Technical Reports Server (NTRS)
Reynard, W. D.
1983-01-01
The rationale for aviation incident reporting systems is presented and contrasted to some of the shortcomings of accident investigation procedures. The history of the United State's Aviation Safety Reporting System (ASRS) is outlined and the program's character explained. The planning elements that resulted in the ASRS program's voluntary, confidential, and non-punitive design are discussed. Immunity, from enforcement action and misuse of the volunteered data, is explained and evaluated. Report generation techniques and the ASRS data analysis process are described; in addition, examples of the ASRS program's output and accomplishments are detailed. Finally, the value of incident reporting for the acquisition of safety information, particularly human error data, is explored.
Space-Based Remote Sensing of the Earth: A Report to the Congress
NASA Technical Reports Server (NTRS)
1987-01-01
The commercialization of the LANDSAT Satellites, remote sensing research and development as applied to the Earth and its atmosphere as studied by NASA and NOAA is presented. Major gaps in the knowledge of the Earth and its atmosphere are identified and a series of space based measurement objectives are derived. The near-term space observations programs of the United States and other countries are detailed. The start is presented of the planning process to develop an integrated national program for research and development in Earth remote sensing for the remainder of this century and the many existing and proposed satellite and sensor systems that the program may include are described.
Soil Moisture Active Passive (SMAP) Calibration and Validation Plan and Current Activities
NASA Technical Reports Server (NTRS)
Jackson, T. J.; Cosh, M.; Bindlish, R.; Crow, W.; Colliander, A.; Njoku, E.; McDonald, K.; Kimball, J.; Belair, S.; Walker, J.;
2010-01-01
The primary objective of the SMAP calibration and validation (Cal/Val) program is demonstrating that the science requirements (product accuracy and bias) have been met over the mission life. This begins during pre-launch with activities that contribute to high quality products and establishing post-launch validation infrastructure and continues through the mission life. However, the major focus is on a relatively short Cal/Val period following launch. The general approach and elements of the SMAP Cal/Val plan will be described and along with details on several ongoing or recent field experiments designed to address both near- and long-term Cal/Val.
NASA electronic message experiment and study: Detailed test plans
NASA Technical Reports Server (NTRS)
1979-01-01
A methodology for evaluating the utility of high speed digital facsimile as a component of the projected NASA-wide electronic message network is presented. Equipment checkout, operator familiarization, pretest calibration, and the development of procedures are addressed. An experimental test program of the facsimile message service which will carry duplicates of the actual messages sent by other means is highlighted. Also, an operational test program during which messages will be sent on a regular basis in order to accumulate the information that will be used to evaluate system performance and project future growth is described.
2009-09-15
EDWARDS AIR FORCE BASE, Calif. – While on the space station, Buzz Lightyear supported NASA’s education outreach program – STEM (Science, Technology, Engineering and Mathematics) -- by creating a series of fun, educational online outreach programs. Following his return, Disney is partnering with NASA to create a new online educational game and an online mission patch competition for school kids across America. NASA will fly the winning patch in space. In addition, NASA plans to announce on Oct. 2 the details of a new exciting educational competition that will give students the opportunity to design an experiment for the astronauts on the space station.
Hypersonic Inflatable Aerodynamic Decelerator (HIAD) Technology Development Overview
NASA Technical Reports Server (NTRS)
Hughes, Stephen J.; Cheatwood, F. McNeil; Calomino, Anthony M.; Wright, Henry S.; Wusk, Mary E.; Hughes, Monica F.
2013-01-01
The successful flight of the Inflatable Reentry Vehicle Experiment (IRVE)-3 has further demonstrated the potential value of Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology. This technology development effort is funded by NASA's Space Technology Mission Directorate (STMD) Game Changing Development Program (GCDP). This paper provides an overview of a multi-year HIAD technology development effort, detailing the projects completed to date and the additional testing planned for the future.
ERIC Educational Resources Information Center
Farr, Helen L. K.
After defining the terms to be discussed (coalition and negotiation), this paper considers in detail some of the kinds of coalition most relevant to the ComField model. The kinds of coalitions include those in professional education, such as professional associations and consortia; nonprofessional coalitions of citizen groups and student groups;…
Reducing the Budget Deficit: The President’s Fiscal Commission and Other Initiatives
2011-04-29
numerous additional savings proposals from the Medicare and Medicaid programs, medical malpractice reform, and transforming the Federal Employees...taxes will likely be required. The sacrifices made today are essential to minimizing the size of potential programmatic cuts or tax increases, reducing...detailing possible ways that the country can put itself on a more sustainable fiscal path. Though the fiscal reform plans differ, they all have several
NASA Technical Reports Server (NTRS)
1994-01-01
This Interface Control Document (ICD) defines the specific details of the complete accomodation information between the Earth Observing System (EOS) PM Spacecraft and the Advanced Microwave Sounding Unit (AMSU-A)Instrument. This is the first submittal of the ICN: it will be updated periodically throughout the life of the program. The next update is planned prior to Critical Design Review (CDR).
ERIC Educational Resources Information Center
Sanders, Mark; Hodges, Chris
2014-01-01
During the Fall 2013 semester East Carolina University's main library piloted 24/5 hours of operation by opening on Sunday morning and not closing until Friday night. This article details the planning and execution of the pilot program, as well the findings from the data collected during the overnight period by people-counting cameras and a…
U.S. Climate Change Technology Program: Strategic Plan
2006-09-01
and Long Term, provides details on the 85 technologies in the R&D portfolio. 21 (Figure 2-1) Continuing Process The United States, in partnership with...locations may be centered near or in residential locations, and work processes and products may be more commonly communicated or delivered via digital... chemical properties, along with advanced methods to simulate processes , will stem from advances in computational technology. Current Portfolio The current
The International Halley Watch
NASA Technical Reports Server (NTRS)
1980-01-01
In preparation for the 1985 to 1986 apparition of Halley's Comet, the International Halley Watch (IHW) has initiated a comprehensive program to simulate, encourage, and coordinate scientific observation of the apparition. The observing groups with which the IHW plans to interact are discussed and the ground based observing nets are described in detail. An outline of the history of observations of Halley's Comet and a synopsis of comet properties and physics are included.
Quarterly Performance/Technical Report of the National Marrow Donor Program
2010-03-31
Implemented the Business to Business ( B2B ) Gateway and Business Services to support : • Incoming HLA typing results incorporating HLA Nomenclature changes...maintenance was performed. IIA.3.2 Task 2: Critical Facility and Staff Related Functions Period 6 Activity: • Business Continuity Planning: o Continued...department development of appropriate detailed tasks to be tested at a remote (non-NMDP controlled) location for the 2010 Business Continuity
Pay for performance in commercial HMOs.
Rosenthal, Meredith B; Landon, Bruce E; Normand, Sharon-Lise T; Frank, Richard G; Epstein, Arnold M
2006-11-02
Pay for performance has increasingly become the subject of intense interest and debate, both of which have been heightened as the Centers for Medicare and Medicaid Services moves closer to adopting this approach for Medicare. Although many claims have been made for the effectiveness of this approach, the extent of its national penetration remains unknown. We surveyed a sample of 252 health maintenance organizations (HMOs) (response rate, 96%) drawn from 41 metropolitan areas across the nation about use of pay for performance. We determined the prevalence of pay-for-performance programs, detailed the features of such programs, and examined the adoption of pay for performance as a function of the characteristics of both the health plans and markets. More than half the HMOs, representing more than 80% of persons enrolled, use pay for performance in their provider contracts. Of the 126 health plans with pay-for-performance programs, nearly 90% had programs for physicians and 38% had programs for hospitals. Use of pay for performance was statistically associated with geographic region, use of primary care providers (PCPs) as gatekeepers, use of capitation to pay PCPs, and whether the plans themselves received bonuses or penalties according to performance. Pay for performance is now commonly used by HMOs, especially those that are situated to assign responsibility for a particular patient to a PCP or medical group. As the design of Medicare with pay for performance moves forward, it will be important to leverage the early experience of pay for performance in the commercial market. Copyright 2006 Massachusetts Medical Society.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Malkewicz, Nicholas; Kirksey, Jim; Finley, Robert
2015-05-01
Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over amore » three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly successful, resulting in a well-construction and completion project that surpassed expectations. The world-class HSE results also demonstrate the commitment of all stakeholders in the project. The details follow in the body of this document« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Haas, J.C.; Olivo, C.A.; Wilson, K.B.
1994-04-01
An experimental test plan has been prepared for DOE/METC review and approval to develop a filter media suitable for multi-contaminant control in granular-bed filter (GBF) applications. The plan includes identification, development, and demonstration of methods for enhanced media morphology, chemical reactivity, and mechanical strength. The test plan includes media preparation methods, physical and chemical characterization methods for fresh and reacted media, media evaluation criteria, details of test and analytical equipment, and test matrix of the proposed media testing. A filter media composed of agglomerated limestone and clay was determined to be the best candidate for multi-contaminate control in GBF operation.more » The combined limestone/clay agglomerate has the potential to remove sulfur and alkali species, in addition to particulate, and possibly halogens and trace heavy metals from coal process streams.« less
Fitzpatrick, Stephanie L; Wilson, Dawn K; Pagoto, Sherry L
2017-06-01
Beginning in January 2018, the Centers for Medicare and Medicaid Services (CMS) plans to cover the Diabetes Prevention Program (DPP), also referred to as Medicare DPP. The American Psychological Association Society for Health Psychology (SfHP) and the Society for Behavioral Medicine (SBM) reviewed the proposed plan. SfHP and SBM are in support of the CMS decision to cover DPP for Medicare beneficiaries but have a significant concern that aspects of the proposal will limit the public health impact. Concerns include the emphasis on weight outcomes to determine continued coverage and the lack of details regarding requirements for coaches. SfHP and SBM are in strong support of modifications to the proposal that would remove the minimum weight loss stipulation to determine coverage and to specify type and qualifications of "coaches."
Hybrid propulsion technology program
NASA Technical Reports Server (NTRS)
1990-01-01
Technology was identified which will enable application of hybrid propulsion to manned and unmanned space launch vehicles. Two design concepts are proposed. The first is a hybrid propulsion system using the classical method of regression (classical hybrid) resulting from the flow of oxidizer across a fuel grain surface. The second system uses a self-sustaining gas generator (gas generator hybrid) to produce a fuel rich exhaust that was mixed with oxidizer in a separate combustor. Both systems offer cost and reliability improvement over the existing solid rocket booster and proposed liquid boosters. The designs were evaluated using life cycle cost and reliability. The program consisted of: (1) identification and evaluation of candidate oxidizers and fuels; (2) preliminary evaluation of booster design concepts; (3) preparation of a detailed point design including life cycle costs and reliability analyses; (4) identification of those hybrid specific technologies needing improvement; and (5) preperation of a technology acquisition plan and large scale demonstration plan.
NASA Technical Reports Server (NTRS)
1984-01-01
The design, development and analysis of the 7.3MW MOD-5A wind turbine generator is documented. The report is divided into four volumes: Volume 1 summarizes the entire MOD-5A program, Volume 2 discusses the conceptual and preliminary design phases, Volume 3 describes the final design of the MOD-5A, and Volume 4 contains the drawings and specifications developed for the final design. Volume 3, book 2 describes the performance and characteristics of the MOD-5A wind turbine generator in its final configuration. The subsystem for power generation, control, and instrumentation subsystems is described in detail. The manufacturing and construction plans, and the preparation of a potential site on Oahu, Hawaii, are documented. The quality assurance and safety plan, and analyses of failure modes and effects, and reliability, availability and maintainability are presented.
Atmospheric chemistry: Description of the area of performance and a working plan
NASA Astrophysics Data System (ADS)
Kirchhoff, Volker W. J. H.
1986-11-01
INPE's program in Atmospheric Chemistry Research is described. Research in this area is concerned with atmospheric gases and their chemical reactions, production and loss rates, and their interactions with the biosphere. Atmospheric chemistry includes concepts in Physics, Chemistry, Meteorology, and Biology, which gives it a strong interdisciplinary character. The interaction of some of the atmospheric gases with the biosphere, such as ozone, is very strong and direct. Studying atmospheric chemistry is, therefore, of direct interest to man and the quality of life. Details are described to define the objectives of study, in particular those of our research program at INPE. A working plan is proposed in order to reach the defined goals. Owing to the large anthropogenic interference in the balance of the natural atmosphere it is anticipated that a better understanding of Atmospheric Chemistry will be the great scientific challenge of the next decade.
Medicare and Medicaid risk contracting opportunities for PSOs.
O'Hare, P K
1997-07-01
Legislation has been proposed in Congress to allow provider-sponsored organizations (PSOs) to negotiate risk contracts directly with the Medicare program and, possibly, with Medicaid programs. Initially, qualifying PSOs would not be required to be licensed as HMOS, but would be required to demonstrate fiscal solvency and meet quality assurance standards. The proposed solvency requirements, as well as requirements regarding the proportion of commercial to Medicare enrollees in a plan, would not be as rigorous for PSOs as they are for HMOs. The legislation's proponents argue that relaxing requirements for PSO risk contracting will allow Medicare and Medicaid beneficiaries more healthcare choices and better benefit packages. Opponents assert that PSOs would be given an unfair advantage in the marketplace and that consumers may be exposed to a greater risk of plan insolvency. While details of the legislation need to be reconciled, many observers predict that it will become law.
Evolution of Requirements and Assumptions for Future Exploration Missions
NASA Technical Reports Server (NTRS)
Anderson, Molly; Sargusingh, Miriam; Perry, Jay
2017-01-01
NASA programs are maturing technologies, systems, and architectures to enabling future exploration missions. To increase fidelity as technologies mature, developers must make assumptions that represent the requirements of a future program. Multiple efforts have begun to define these requirements, including team internal assumptions, planning system integration for early demonstrations, and discussions between international partners planning future collaborations. For many detailed life support system requirements, existing NASA documents set limits of acceptable values, but a future vehicle may be constrained in other ways, and select a limited range of conditions. Other requirements are effectively set by interfaces or operations, and may be different for the same technology depending on whether the hard-ware is a demonstration system on the International Space Station, or a critical component of a future vehicle. This paper highlights key assumptions representing potential life support requirements and explanations of the driving scenarios, constraints, or other issues that drive them.
Architectural programming for the workplace and the careplace.
Easter, James G
2002-01-01
Sensitive planning and architectural design will impact long-term costs and daily operations. At the same time, the quality of the total environment has a direct impact on the patient, the family and the staff. These needs should be carefully balanced with the emotions of the patient, the care partner (parent, husband, wife or guardian) and those of the clinical team (physicians, nurses and staff). This article addresses the first step in the process; the master plan and then focuses in detail on one aspect of the architectural work referred to as architectural programming. The key to the process is selecting the best team of consultants, following the steps carefully, involving the client at every appropriate milestone along the way and asking the right questions. With this experienced team on board; following the proper steps, listening carefully to the answers and observing the daily process one can expect a successful product.
NASA Technical Reports Server (NTRS)
Warmke, J. M.
1979-01-01
Modifications to Battelle's Interactive Graphics Orbit Selection (IGOS) computer program to assist in the planning and evaluation of the Seasat-A Scatterometer System (SASS) flight program were studied. To meet the planning needs of the LaRC Seasat-A Scatterometer team, the following features/modifications were implemented in IGOS: (1) display and specification of time increments in orbital passes represented by the cross-hatching of ground swaths; (2) addition of pass number annotations on the horizontal axis of the STPLNG and STPTOD plots; (3) modification of the sensor model to include more than two swaths associated with a single sensor to approximate the SASS cell pattern; (4) inclusion of down range and cross-track swath geometry to display the characteristic skewed SASS pattern; (5) addition of a swath schedule to allow the display of the SASS mode changes and to calibrate gaps; and (6) development of a set of commands to generate the detailed swath data from sensor characteristics and orbit/earth motion.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vicroy, D.D.
A simplified flight management descent algorithm was developed and programmed on a small programmable calculator. It was designed to aid the pilot in planning and executing a fuel conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. An explanation and examples of how the algorithm is used,more » as well as a detailed flow chart and listing of the algorithm are contained.« less
International Planning for Subglacial Lake Exploration
NASA Astrophysics Data System (ADS)
Kennicutt, M.; Priscu, J.
2003-04-01
As one of the last unexplored frontiers on our planet, subglacial lakes offer a unique and exciting venue for exploration and research. Over the past several years, subglacial lakes have captured the imagination of the scientific community and public, evoking images of potential exotic life forms surviving under some of the most extreme conditions on earth. Various planning activities have recognized that due to the remote and harsh conditions, that a successful subglacial lake exploration program will entail a concerted effort for a number of years. It will also require an international commitment of major financial and human resources. To begin a detailed planning process, the Scientific Committee on Antarctic Research (SCAR) convened the Subglacial Antarctic Lake Exploration Group of Specialists (SALEGOS) in Tokyo in 2000. The group was asked to build on previous workshops and meetings to develop a plan to explore subglacial lake environments. Its mandate adopted the guiding principles as agreed in Cambridge in 1999 that the program would be interdisciplinary in scope, be designed for minimum contamination and disturbance of the subglacial lake environment, have as a goal lake entry and sample retrieval, and that the ultimate target of the program should be Lake Vostok exploration. Since its formation SALEGOS has met three times and addressed some of the more intractable issues related to subglacial lake exploration. Topics under discussion include current state-of-the-knowledge of subglacial environments, technological needs, international management and organizational strategies, a portfolio of scientific projects, "clean" requirements, and logistical considerations. In this presentation the actvities of SALEGOS will be summarized and recommendations for an international subglacial lake exploration program discussed.
40 CFR 270.18 - Specific part B information requirements for waste piles.
Code of Federal Regulations, 2010 CFR
2010-07-01
... complied with or detailed plans and an engineering report describing how the requirements of § 264.90(b)(2) will be met. (c) Detailed plans and an engineering report describing how the waste pile is designed and...(b) of this chapter, submit detailed plans, and engineering and hydrogeological reports, as...
40 CFR 270.18 - Specific part B information requirements for waste piles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... complied with or detailed plans and an engineering report describing how the requirements of § 264.90(b)(2) will be met. (c) Detailed plans and an engineering report describing how the waste pile is designed and...(b) of this chapter, submit detailed plans, and engineering and hydrogeological reports, as...
FIRE STATION AND GUARD HOUSE, PLANS AND DETAILS. Plan No. ...
FIRE STATION AND GUARD HOUSE, PLANS AND DETAILS. Plan No. 6754-319, dated August 1, 1933. Construction Division, Office of the Constructing Quartermaster - Hamilton Field, Fire Station & Guard House, Southwest corner of Seventh Street & Hangar Avenue, Novato, Marin County, CA
Imperato, Pascal James
2015-06-01
In 1947, a smallpox outbreak occurred in New York City with a total of twelve cases and two deaths. In order to contain this outbreak, the New York City Department of Health launched a mass immunization campaign that over a period of some 60 days vaccinated 6.35 million people. This article examines in detail the epidemiology of this outbreak and the measures employed to contain it. In 1976, a swine influenza strain was isolated among a few recruits at a US Army training camp at Fort Dix, New Jersey. It was concluded at the time that this virus possibly represented a re-appearance of the 1918 influenza pandemic influenza strain. As a result, a mass national immunization program was launched by the federal government. From its inception, the program encountered a myriad of challenges ranging from doubts that it was even necessary to the development of Guillain-Barré paralysis among some vaccine recipients. This paper examines the planning for and implementation of the swine flu immunization program in New York City. It also compares it to the smallpox vaccination program of 1947. Despite equivalent financial and personnel resources, leadership and organizational skills, the 1976 program only immunized approximately a tenth of the number of New York City residents vaccinated in 1947. The reasons for these marked differences in outcomes are discussed in detail.
Monitoring in the nearshore: A process for making reasoned decisions
Bodkin, James L.; Dean, T.A.
2003-01-01
Over the past several years, a conceptual framework for the GEM nearshore monitoring program has been developed through a series of workshops. However, details of the proposed monitoring program, e.g. what to sample, where to sample, when to sample and at how many sites, have yet to be determined. In FY 03 we were funded under Project 03687 to outline a process whereby specific alternatives to monitoring are developed and presented to the EVOS Trustee Council for consideration. As part of this process, two key elements are required before reasoned decisions can be made. These are: 1) a comprehensive historical perspective of locations and types of past studies conducted in the nearshore marine communities within Gulf of Alaska, and 2) estimates of costs for each element of a proposed monitoring program. We have developed a GIS database that details available information from past studies of selected nearshore habitats and species in the Gulf of Alaska and provide a visual means of selecting sites based (in part) on the locations for which historical data of interest are available. We also provide cost estimates for specific monitoring plan alternatives and outline several alternative plans that can be accomplished within reasonable budgetary constraints. The products that we will provide are: 1) A GIS database and maps showing the location and types of information available from the nearshore in the Gulf of Alaska; 2) A list of several specific monitoring alternatives that can be conducted within reasonable budgetary constraints; and 3) Cost estimates for proposed tasks to be conducted as part of the nearshore program. Because data compilation and management will not be completed until late in FY03 we are requesting support for close-out of this project in FY 04.
Preventing Drug Abuse Among Hispanic Adolescents: Developing a Responsive Intervention Approach.
Schinke, Steven P; Schwinn, Traci M; Hursh, Hilary A
2015-10-01
Intervention research is essential to help Hispanic American adolescents avoid drug use. This article describes an intervention research program aimed at preventing drug use among these youths. Grounded in salient epidemiological data, the program is informed by bicultural competence, social learning, and motivational interviewing theories. The program, called Vamos, is aimed at the risk and protective factors as well as the cultural prerogatives that demark the adolescent years of Hispanic American youths. Innovative in its approach, the program is delivered through a smartphone application (app). By interacting with engaging content presented via the app, youths can acquire the cognitive-behavioral skills necessary to avoid risky situations, urges, and pressures associated with early drug use. The intervention development process is presented in detail, and an evaluation plan to determine the program's efficacy is outlined. Lessons for practice and intervention programming are discussed.
Preventing Drug Abuse Among Hispanic Adolescents: Developing a Responsive Intervention Approach
Schinke, Steven P.; Schwinn, Traci M.; Hursh, Hilary A.
2014-01-01
Intervention research is essential to help Hispanic American adolescents avoid drug use. This article describes an intervention research program aimed at preventing drug use among these youths. Grounded in salient epidemiological data, the program is informed by bicultural competence, social learning, and motivational interviewing theories. The program, called Vamos, is aimed at the risk and protective factors as well as the cultural prerogatives that demark the adolescent years of Hispanic American youths. Innovative in its approach, the program is delivered through a smartphone application (app). By interacting with engaging content presented via the app, youths can acquire the cognitive–behavioral skills necessary to avoid risky situations, urges, and pressures associated with early drug use. The intervention development process is presented in detail, and an evaluation plan to determine the program's efficacy is outlined. Lessons for practice and intervention programming are discussed. PMID:26500421
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holt, V.L.; Baron, L.A.
1994-05-01
This site-specific Work Plan/Health and Safety Checklist (WP/HSC) is a supplement to the general health and safety plan (HASP) for Waste Area Grouping (WAG) 2 remedial investigation and site investigation (WAG 2 RI&SI) activities [Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169)] and provides specific details and requirements for the WAG 2 RI&SI Sediment Transport Modeling Task. This WP/HSC identifies specific site operations, site hazards, and any recommendations by Oak Ridge National Laboratory (ORNL) health and safety organizations [i.e., Industrial Hygiene (IH),more » Health Physics (HP), and/or Industrial Safety] that would contribute to the safe completion of the WAG 2 RI&SI. Together, the general HASP for the WAG 2 RI&SI (ORNL/ER-169) and the completed site-specific WP/HSC meet the health and safety planning requirements specified by 29 CFR 1910.120 and the ORNL Hazardous Waste Operations and Emergency Response (HAZWOPER) Program Manual. In addition to the health and safety information provided in the general HASP for the WAG 2 RI&SI, details concerning the site-specific task are elaborated in this site-specific WP/HSC, and both documents, as well as all pertinent procedures referenced therein, will be reviewed by all field personnel prior to beginning operations.« less
Developments in Assisting Countries in Implementing the IAEA Additional Protocol
DOE Office of Scientific and Technical Information (OSTI.GOV)
Killinger, Mark H.; Hansen, Linda H.; Cain, Ronald A.
In 2008, the U.S. Department of Energy (DOE) began assisting selected non-nuclear weapon states in planning and preparing for implementation of the International Atomic Energy Agency’s Additional Protocol (AP). Since then, the AP international implementation program has contributed to the substantial progress made by Vietnam, Thailand, Iraq, and Malaysia in preparing for entry-into-force of the AP. An overall engagement plan has been developed with components designed to train government AP implementing agencies, inform policy makers, conduct outreach to industry and universities, make AP reporting software available and useful, and plan a detailed approach for implementing the declaration and complementary accessmore » provisions of the AP. DOE recently began collaborating with Indonesia, which has already entered the AP into force, requiring a second method of engagement somewhat different from that taken with countries that have not entered the AP into force. The AP international implementation program, administered by the International Nuclear Safeguards and Engagement Program, is working more closely with DOE’s International Nonproliferation Export Control Program to ensure countries are aware of and prepared to implement the export/import provisions of the AP. As the AP implementation program matures and helps move countries closer to entry-into-force or improved AP implementation, it is identifying characteristics of a country’s “end-state” that indicate that DOE assistance is no longer required. The U.S. AP Implementation Act and Senate Resolution of Ratification require the Administration to report annually to Congress on measures taken to achieve the adoption of the AP in non-nuclear weapon states. DOE’s AP international implementation program is a significant part of these measures. This paper describes recent developments to increase the scope and effectiveness of the program.« less
Pololi, Linda H; Evans, Arthur T
2015-01-01
To address a dearth of mentoring and to avoid the pitfalls of dyadic mentoring, the authors implemented and evaluated a novel collaborative group peer mentoring program in a large academic department of medicine. The mentoring program aimed to facilitate faculty in their career planning, and targeted either early-career or midcareer faculty in 5 cohorts over 4 years, from 2010 to 2014. Each cohort of 9-12 faculty participated in a yearlong program with foundations in adult learning, relationship formation, mindfulness, and culture change. Participants convened for an entire day, once a month. Sessions incorporated facilitated stepwise and values-based career planning, skill development, and reflective practice. Early-career faculty participated in an integrated writing program and midcareer faculty in leadership development. Overall attendance of the 51 participants was 96%, and only 3 of 51 faculty who completed the program left the medical school during the 4 years. All faculty completed a written detailed structured academic development plan. Participants experienced an enhanced, inclusive, and appreciative culture; clarified their own career goals, values, strengths and priorities; enhanced their enthusiasm for collaboration; and developed skills. The program results highlight the need for faculty to personally experience the power of forming deep relationships with their peers for fostering successful career development and vitality. The outcomes of faculty humanity, vitality, professionalism, relationships, appreciation of diversity, and creativity are essential to the multiple missions of academic medicine. © 2015 The Alliance for Continuing Education in the Health Professions, the Society for Academic Continuing Medical Education, and the Council on Continuing Medical Education, Association for Hospital Medical Education.
NASA Technical Reports Server (NTRS)
Wilson, Gregory S.; Huntress, Wesley T.
1990-01-01
The rationale behind Mission to Planet Earth is presented, and the program plan is described in detail. NASA and its interagency and international partners will place satellites carrying advanced sensors in strategic earth orbits to collect muultidisciplinary data. A sophisticated data system will process and archive an unprecedented large amount of information about the earth and how it functions as a system. Attention is given to the space observatories, the data and information systems, and the interdisciplinary research.
A primer for effective organization of professional conferences.
Werner, Susan E; Kenefick, Colleen
2005-01-01
The challenge of organizing a successful conference is a tremendous commitment requiring extensive preparation and teamwork. It is tempting but dangerous to underestimate the details needed to coordinate an outstanding event. Conferences follow a natural life cycle from proposal, gaining administrative support, planning, implementing, and then finally evaluating outcomes. These guidelines identify the tasks and areas of responsibilities required including setting objectives, budgeting, selecting a venue, publicity, programming, and working with vendors.
NASA/ESA CV-990 Spacelab Simulation (ASSESS 2)
NASA Technical Reports Server (NTRS)
Mulholland, D. R.; Androes, G. M.; Reeves, J. F.
1978-01-01
To test the validity of the ARC approach to Spacelab, several missions simulating aspects of Spacelab operations have been conducted as part of the ASSESS Program. Each mission was designed to evaluate potential Shuttle/Spacelab concepts in increasing detail. For this mission, emphasis was placed on development and exercise of management techniques planned for Spacelab using management participants from NASA and ESA who have responsibilities for Spacelab 1 which will be launched in 1980.
General Aviation Turbine Engine (GATE) study
NASA Technical Reports Server (NTRS)
Baerst, C. F.; Furst, D. G.
1979-01-01
The feasibility of turbine engines for the smaller general aviation aircraft was investigated and a technology program for developing the necessary technology was identified. Major results included the definition of the 1988 general aviation market, the identification of turboprop and turboshaft engines that meet the requirements of the aircraft studies, a benefit analysis showing the superiority of gas turbine engines for portions of the market studied, and detailed plans for the development of the necessary technology.
HAL/S-360 compiler test activity report
NASA Technical Reports Server (NTRS)
Helmers, C. T.
1974-01-01
The levels of testing employed in verifying the HAL/S-360 compiler were as follows: (1) typical applications program case testing; (2) functional testing of the compiler system and its generated code; and (3) machine oriented testing of compiler implementation on operational computers. Details of the initial test plan and subsequent adaptation are reported, along with complete test results for each phase which examined the production of object codes for every possible source statement.
EMPTAC (Electromagnetic Pulse Test Aircraft) user's guide
NASA Astrophysics Data System (ADS)
Cleaveland, Dale R.; Burkhard, Avery
1988-04-01
This guide was established to give test managers a way to familiarize themselves with the Air Force Weapons Laboratory's electromagnetic pulse (EMP) test aircraft program located at Kirtland Air Force Base (KAFB), New Mexico. Brief descriptions of the available EMP test facilities at KAFB are also included. This guide should give prospective customers (users) adequate information to scope the magnitude of their test effort and to accomplish general planning without extensive involvement in test execution details.
Advanced Planning for Tsunamis in California
NASA Astrophysics Data System (ADS)
Miller, K.; Wilson, R. I.; Larkin, D.; Reade, S.; Carnathan, D.; Davis, M.; Nicolini, T.; Johnson, L.; Boldt, E.; Tardy, A.
2013-12-01
The California Tsunami Program is comprised of the California Governor's Office of Emergency Services (CalOES) and the California Geological Survey (CGS) and funded through the National Tsunami Hazard Mitigation Program (NTHMP) and the Federal Emergency Management Agency (FEMA). The program works closely with the 20 coastal counties in California, as well as academic, and industry experts to improve tsunami preparedness and mitigation in shoreline communities. Inundation maps depicting 'worst case' inundation modeled from plausible sources around the Pacific were released in 2009 and have provided a foundation for public evacuation and emergency response planning in California. Experience during recent tsunamis impacting the state (Japan 2011, Chile 2010, Samoa 2009) has brought to light the desire by emergency managers and decision makers for even more detailed information ahead of future tsunamis. A solution to provide enhanced information has been development of 'playbooks' to plan for a variety of expected tsunami scenarios. Elevation 'playbook' lines can be useful for partial tsunami evacuations when enough information about forecast amplitude and arrival times is available to coastal communities and there is sufficient time to make more educated decisions about who to evacuate for a given scenario or actual event. NOAA-issued Tsunami Alert Bulletins received in advance of a distant event will contain an expected wave height (a number) for each given section of coast. Provision of four elevation lines for possible inundation enables planning for different evacuation scenarios based on the above number potentially alleviating the need for an 'all or nothing' decision with regard to evacuation. Additionally an analytical tool called FASTER is being developed to integrate storm, tides, modeling errors, and local tsunami run-up potential with the forecasted tsunami amplitudes in real-time when a tsunami Alert is sent out. Both of these products will help communities better implement evacuations and response activities for minor to moderate (less than maximum) tsunami events. A working group comprised of federal, state, and local governmental scientists, emergency managers, first responders, and community planners has explored details and delivery of the above tools for incorporation into emergency management protocols. The eventual outcome will be inclusion in plans, testing of protocols and methods via drills and exercises and application, as appropriate, during an impending tsunami event.
NASA Technical Reports Server (NTRS)
Mock, W. D.; Latham, R. A.
1982-01-01
The NASTRAN model plan for the wing structure was expanded in detail to generate the NASTRAN model for this substructure. The grid point coordinates were coded for each element. The material properties and sizing data for each element were specified. The wing substructure model was thoroughly checked out for continuity, connectivity, and constraints. This substructure was processed for structural influence coefficients (SIC) point loadings and the deflections were compared to those computed for the aircraft detail model. Finally, a demonstration and validation processing of this substructure was accomplished using the NASTRAN finite element program. The bulk data deck, stiffness matrices, and SIC output data were delivered.
NASA Technical Reports Server (NTRS)
Mock, W. D.; Latham, R. A.; Tisher, E. D.
1982-01-01
The NASTRAN model plans for the horizontal stabilizer, vertical stabilizer, and nacelle structure were expanded in detail to generate the NASTRAN model for each of these substructures. The grid point coordinates were coded for each element. The material properties and sizing data for each element were specified. Each substructure model was thoroughly checked out for continuity, connectivity, and constraints. These substructures were processed for structural influence coefficients (SIC) point loadings and the deflections were compared to those computed for the aircraft detail models. Finally, a demonstration and validation processing of these substructures was accomplished using the NASTRAN finite element program installed at NASA/DFRC facility.
NASA Technical Reports Server (NTRS)
Mock, W. D.; Latham, R. A.
1982-01-01
The NASTRAN model plan for the fuselage structure was expanded in detail to generate the NASTRAN model for this substructure. The grid point coordinates were coded for each element. The material properties and sizing data for each element were specified. The fuselage substructure model was thoroughly checked out for continuity, connectivity, and constraints. This substructure was processed for structural influence coefficients (SIC) point loadings and the deflections were compared to those computed for the aircraft detail model. Finally, a demonstration and validation processing of this substructure was accomplished using the NASTRAN finite element program. The bulk data deck, stiffness matrices, and SIC output data were delivered.
Ambitious U.S. Federal Budget Proposal Strong on Science, Short on Details
NASA Astrophysics Data System (ADS)
Showstack, Randy
2009-03-01
The proposed $3.6 trillion U.S. federal budget for fiscal year (FY) 2010, which the Obama administration released on 26 February, includes significant funding for federal science agencies. The budget also emphasizes the development of a comprehensive energy and climate change plan-including a cap and trade program to reduce greenhouse gas emissions-``to transform our energy supply and slow global warming,'' according to the budget document released by the White House Office of Management and Budget (OMB). However, the 134-page budget document-which also emphasizes a theme of rebuilding environmental and resource agencies-is thin on specifics. Programmatic budget details will be released in April, according to an OMB senior official.
Lawrence Berkeley National Laboratory 2015 Annual Financial Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, Kim, P
FY2015 financial results reflect a year of significant scientific, operational and financial achievement for Lawrence Berkeley National Laboratory. Complementing many scientific accomplishments, Berkeley Lab completed construction of four new research facilities: the General Purpose Laboratory, Chu Hall, Wang Hall and the Flexlab Building Efficiency Testbed. These state-of-the-art facilities allow for program growth and enhanced collaboration, in part by enabling programs to return to the Lab’s Hill Campus from offsite locations. Detailed planning began for the new Integrative Genomics Building (IGB) that will house another major program currently located offsite. Existing site infrastructure was another key focus area. The Lab prioritizedmore » and increased investments in deferred maintenance in alignment with the Berkeley Lab Infrastructure Plan, which was developed under the leadership of the DOE Office of Science. With the expiration of American Recovery and Reinvestment Act (ARRA) funds, we completed the close-out of all of our 134 ARRA projects, recording total costs of $331M over the FY2009-2015 period. Download the report to read more.« less
Guide to conducting state recycling economic development finance workshops
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-12-31
The objective of this project was to demonstrate a two-pronged program for educating economic development and recycling officials about recycling business development opportunities. The project consisted of conducting a stat recycling finance workshop in each of three Northeastern states, as well as recycling economic development finance training program for the region`s economic development and recycling officials. The goal of the project is to facilitate the expansion of recycling businesses in the Northeast. The guide details seven steps to conducting a recycling economic development finance workshop: (1) establish a workshop planning committee, (2) select the target audience, (3) develop the workshopmore » message, (4) identify the message deliverer, (5) choose workshop topics and structure the workshop, (6) attract the audience, and (7) Conduct follow-up. In the process of planning and conducting the three state workshops for this project, NERC learned several important lessons: (1) Conduct workshops that are specific to the recycling and economic development programs in the state. (2) Include recycling business case studies on the workshop agenda. (3) Enhance the workshop with recycling economic development finance training. Develop a comprehensive marketing strategy.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
BROOKHAVEN NATIONAL LABORATORY
Brookhaven National Laboratory (BNL) is a multi-program national laboratory operated by Brookhaven Science Associates for the U.S. Department of Energy (DOE) and is located on a 5,265-acre site in Suffolk County, Long Island, New York. BNL has a comprehensive Environmental Management System (EMS) in place, which meets the requirements of the International Organization for Standardization 14001 EMS Standard, as described in the BNL EMS Manual. BNL's extensive environmental monitoring program is one component of the EMS, and the BNL Environmental Monitoring Plan (EMP) describes this program in detail. The data derived from systematically monitoring the various environmental media on sitemore » enable BNL to make informed decisions concerning the protection of human health and the environment and to be responsive to community concerns.« less
CAD/CAM approach to improving industry productivity gathers momentum
NASA Technical Reports Server (NTRS)
Fulton, R. E.
1982-01-01
Recent results and planning for the NASA/industry Integrated Programs for Aerospace-Vehicle Design (IPAD) program for improving productivity with CAD/CAM methods are outlined. The industrial group work is being mainly done by Boeing, and progress has been made in defining the designer work environment, developing requirements and a preliminary design for a future CAD/CAM system, and developing CAD/CAM technology. The work environment was defined by conducting a detailed study of a reference design process, and key software elements for a CAD/CAM system have been defined, specifically for interactive design or experiment control processes. Further work is proceeding on executive, data management, geometry and graphics, and general utility software, and dynamic aspects of the programs being developed are outlined
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fraley, John J.; Marotz, Brian L.; DosSantos, Joseph M.
In this document we present fisheries losses, mitigation alternatives, and recommendations to protect, mitigate, and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan addresses six separate program measures in the 1987 Columbia Basin Fish and Wildlife Program. We designed the plan to be closely coordinated in terms of dam operations, funding, and activities with the Kerr Mitigation Plan presently before the Federal Energy Regulatory Commission. This document represents a mitigation plan for consideration by the Northwest Power Planning Council process; it is not an implementation plan. Flathead Lake is onemore » of the cleanest lakes of its size in the world. The exceptional water quality and unique native fisheries make the Flathead Lake/River system extremely valuable to the economy and quality of life in the basin. The recreational fishery in Flathead Lake has an estimated value of nearly eight million dollars annually. This mitigation process represents our best opportunity to reduce the impacts of hydropower in this valuable aquatic system and increase angling opportunity. We based loss estimates and mitigation alternatives on an extensive data base, agency reports, nationally and internationally peer-reviewed scientific articles, and an innovative biological model for Hungry Horse Reservoir and the Flathead River. We conducted an extensive, 14-month scoping and consultation process with agency representatives, representatives of citizen groups, and the general public. This consultation process helped identify issues, areas of agreement, areas of conflict, and advantages and disadvantages of mitigation alternatives. The results of the scoping and consultation process helped shape our mitigation plan. Our recommended plan is based firmly on principles of adaptive management and recognition of biological uncertainty. After we receive direction from the NPPC, we will add more detailed hypotheses and other features necessary for a long-term implementation plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boston, H.L.; Ashwood, T.L.; Borders, D.M.
1992-02-01
This field sampling and analysis (S & A) plan has been developed as part of the Department of Energy`s (DOE`s) remedial investigation (RI) of Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL) located in Oak Ridge, Tennessee. The S & A plan has been written in support of the remedial investigation (RI) plan for WAG 2 (ORNL 1990). WAG 2 consists of White Oak Creek (WOC) and its tributaries downstream of the ORNL main plant area, White Oak Lake (WOL), White Oak Creek embayment (WOCE) on the Clinch River, and the associated floodplain and subsurface environment (Fig.more » 1.1). The WOC system is the surface drainage for the major ORNL WAGs and has been exposed to a diversity of contaminants from operations and waste disposal activities in the WOC watershed. WAG 2 acts as a conduit through which hydrologic fluxes carry contaminants from upgradient areas to the Clinch River. Water, sediment, soil, and biota in WAG 2 are contaminated and continue to receive contaminants from upgradient WAGs. This document describes the following: an overview of the RI plan, background information for the WAG 2 system, and objectives of the S & A plan; the scope and implementation of the first 2 years of effort of the S & A plan and includes recent information about contaminants of concern, organization of S & A activities, interactions with other programs, and quality assurance specific to the S & A activities; provides details of the field sampling plans for sediment, surface water, groundwater, and biota, respectively; and describes the sample tracking and records management plan.« less
30 CFR 784.16 - Reclamation plan: Siltation structures, impoundments, and refuse piles.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., and refuse piles. (a) General. Each application must include a general plan and a detailed design plan... survey describing the potential effect on the structure from subsidence of the subsurface strata... certification statement which includes a schedule setting forth the dates when any detailed design plans for...
30 CFR 780.25 - Reclamation plan: Siltation structures, impoundments, and refuse piles.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., and refuse piles. (a) General. Each application must include a general plan and a detailed design plan... survey describing the potential effect on the structure from subsidence of the subsurface strata... certification statement which includes a schedule setting forth the dates that any detailed design plans for...
30 CFR 784.16 - Reclamation plan: Siltation structures, impoundments, and refuse piles.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., and refuse piles. (a) General. Each application must include a general plan and a detailed design plan... survey describing the potential effect on the structure from subsidence of the subsurface strata... certification statement which includes a schedule setting forth the dates when any detailed design plans for...
How small business health exchanges can offer value to their future customers--and why they must.
Kingsdale, Jon
2012-02-01
The success of the Small Business Health Options Program (SHOP)-health insurance exchanges targeted at the small-group market and opening for business in January 2014-will depend in large part on persuading small employers and qualified health plans to participate. The most important objective will be offering employers lower-cost health plans than they have now. Other critical objectives will be offering small firms administrative efficiencies and access to choices among high-value plans that are not offered elsewhere. This article frames the challenges that exchanges will encounter in meeting these objectives. In particular, it discusses the advisability of small-business exchanges' offering an "employee choice" model (which the article describes in detail); of combining the small-business and individual exchanges to broaden product offerings and gain operational efficiencies; and of encouraging low-cost plans to enter the exchange market, perhaps by enabling Medicaid managed care plans to offer comparable commercial products, and in turn affording health plans access to a uniquely motivated market of small firms and their workers who want affordable coverage.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elvado Environmental LLC
2009-09-01
This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2010 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contaminationmore » and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2010 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2010 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2010 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2010) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.« less
IAC level "O" program development
NASA Technical Reports Server (NTRS)
Vos, R. G.
1982-01-01
The current status of the IAC development activity is summarized. The listed prototype software and documentation was delivered, and details were planned for development of the level 1 operational system. The planned end product IAC is required to support LSST design analysis and performance evaluation, with emphasis on the coupling of required technical disciplines. The long term IAC effectively provides two distinct features: a specific set of analysis modules (thermal, structural, controls, antenna radiation performance and instrument optical performance) that will function together with the IAC supporting software in an integrated and user friendly manner; and a general framework whereby new analysis modules can readily be incorporated into IAC or be allowed to communicate with it.
NASA Technical Reports Server (NTRS)
Oberg, James E.
1990-01-01
Examination of newly disclosed evidence confirms that the Soviets were indeed striving to reach the moon before the U.S. in 1969. It is noted that a Soviet unmanned lunar probe crashed on the moon's surface only hours before the U.S. Apollo landing. Now confirmed openly are moon-exploration schedules that were competitive with Apollo plans, the names and histories of Soviet lunar boosters and landers, identities of the lunar cosmonauts; and even photos of manned lunar craft are available. Additional details on the troubled moon-probe program are presented: technical problems, continuous changes in goals, schedules, and planning, vehicle and personnel disasters, transfer of authority between ministries, and political power struggles in the scientific community.
Space science for applications - The history of Landsat
NASA Technical Reports Server (NTRS)
Mach, P. E.
1981-01-01
The history of the Landsat project is discussed in terms of three historical phases, each characterized by a dominant problem. From 1964 to 1967, the challenge was to develop interagency cooperation and to achieve consensus on basic plans for the satellite. Between 1968 and 1971, the cooperating agencies had to persuade the Bureau of the Budget to provide funding for the project. Since 1972, the challenge to NASA has been to encourage applications of the Landsat data and plan the shift from an experimental program to an operational one. The tension between experimental and operational goals has run through all these phases, and the conflicts between agencies is detailed, as well as the interaction between technological and political systems.
Accreditation of Individualized Quality Control Plans by the College of American Pathologists.
Hoeltge, Gerald A
2017-03-01
The Laboratory Accreditation Program of the College of American Pathologists (CAP) began in 2015 to allow accredited laboratories to devise their own strategies for quality control of laboratory testing. Participants now have the option to implement individualized quality control plans (IQCPs). Only nonwaived testing that features an internal control (built-in, electronic, or procedural) is eligible for IQCP accreditation. The accreditation checklists that detail the requirements have been peer-reviewed by content experts on CAP's scientific resource committees and by a panel of accreditation participants. Training and communication have been key to the successful introduction of the new IQCP requirements. Copyright © 2016 Elsevier Inc. All rights reserved.
Establishing a profitable skin care practice in a facial plastic surgery office.
Cortez, Edwin A
2010-11-01
Facial plastic surgeons seeking information about establishing and maintaining a first-rate skin care program and practice in their office will learn practice management tips and business advice. This content begins with presenting steps in patient evaluation and continues through development of a care plan. Discussion includes approach to skin care products, sunscreen, and related preventive and restorative methods. Detailed discussion is included of developing a personalized skin care plan. The content concludes with essential business tips and marketing advice for the facial plastic surgeon to include skin care in the surgical practice, including the way in which these are handled in the author's practice. Copyright © 2010 Elsevier Inc. All rights reserved.
Fly-by-light flight control system technology development plan
NASA Technical Reports Server (NTRS)
Chakravarty, A.; Berwick, J. W.; Griffith, D. M.; Marston, S. E.; Norton, R. L.
1990-01-01
The results of a four-month, phased effort to develop a Fly-by-Light Technology Development Plan are documented. The technical shortfalls for each phase were identified and a development plan to bridge the technical gap was developed. The production configuration was defined for a 757-type airplane, but it is suggested that the demonstration flight be conducted on the NASA Transport Systems Research Vehicle. The modifications required and verification and validation issues are delineated in this report. A detailed schedule for the phased introduction of fly-by-light system components has been generated. It is concluded that a fiber-optics program would contribute significantly toward developing the required state of readiness that will make a fly-by-light control system not only cost effective but reliable without mitigating the weight and high-energy radio frequency related benefits.
Balloon-borne three-meter telescope for far-infrared and submillimeter astronomy
NASA Technical Reports Server (NTRS)
Fazio, Giovanni G.; Hoffmann, William F.; Harper, Doyal A.
1988-01-01
The scientific objectives, engineering analysis and design, results of technology development, and focal-plane instrumentation for a two-meter balloon-borne telescope for far-infrared and submillimeter astronomy are presented. The unique capabilities of balloon-borne observations are discussed. A program summary emphasizes the development of the two-meter design. The relationship of the Large Deployable Reflector (LDR) is also discussed. Detailed treatment is given to scientific objectives, gondola design, the mirror development program, experiment accommodations, ground support equipment requirements, NSBF design drivers and payload support requirements, the implementation phase summary development plan, and a comparison of three-meter and two-meter gondola concepts.
The master in addiction medicine program in the Netherlands.
De Jong, Cornelis; Luycks, Lonneke; Delicat, Jan-Wilm
2011-04-01
Since 2007 there is a full-time, 2-year professional training in addiction medicine in the Netherlands. The aim of this article is to describe in detail the development and present status of the Dutch Master in Addiction Medicine (MiAM) program. In this competency-based professional training, theoretical courses are integrated with learning in clinical practice under guidance of an experienced clinical teacher. The theoretical courses consist of evidence-based medicine, communication and basic psychotherapeutic skills, neurobiology of addiction, addiction medicine, addiction and psychiatry, and public health. The 7 main competencies are made ready for operation in the personal education plan and are evaluated by different styles of examination.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boe, Stephen J.; Lofy, Peter T.
2002-11-01
This is the second annual report of a multi-year, multi-agency project to restore spring chinook salmon populations in the Grande Ronde River Basin (Grande Ronde Endemic Chinook Salmon Program--GRESCP). The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) operates adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to increase natural production and restore fisheries in these two streams. Statement of Work Objectives formore » 1999: (1) Participate in development and continued implementation of the comprehensive multi year operations plan for the Grande Ronde Endemic Supplementation Program. (2) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2000. (3) Monitor adult endemic spring chinook salmon populations and collect broodstock. (4) Plan detailed Monitoring and Evaluation for future years. (5) Monitor population abundance and characteristics and local environmental factors that may influence abundance and run timing of Grande Ronde River spring chinook populations. (6) Participate in Monitoring and Evaluation of the captive brood component of the Program to assure this component is contributing to the Program. (7) Participate in data collection for incidentally-caught bull trout and summer steelhead and planning for recovery of summer steelhead populations. (8) Document accomplishments and needs to permitters, comanagers, and funding agencies. (9) Communicate project results to the scientific community.« less
NASA Technical Reports Server (NTRS)
Vijgen, P. M. H. W.; Hardin, J. D.; Yip, L. P.
1992-01-01
Accurate prediction of surface-pressure distributions, merging boundary-layers, and separated-flow regions over multi-element high-lift airfoils is required to design advanced high-lift systems for efficient subsonic transport aircraft. The availability of detailed measurements of pressure distributions and both averaged and time-dependent boundary-layer flow parameters at flight Reynolds numbers is critical to evaluate computational methods and to model the turbulence structure for closure of the flow equations. Several detailed wind-tunnel measurements at subscale Reynolds numbers were conducted to obtain detailed flow information including the Reynolds-stress component. As part of a subsonic-transport high-lift research program, flight experiments are conducted using the NASA-Langley B737-100 research aircraft to obtain detailed flow characteristics for support of computational and wind-tunnel efforts. Planned flight measurements include pressure distributions at several spanwise locations, boundary-layer transition and separation locations, surface skin friction, as well as boundary-layer profiles and Reynolds stresses in adverse pressure-gradient flow.
NIF Operations Management Plan, August 2011
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Wonterghem, Bruno M.
Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in themore » laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the requirements, document flow down, organizational vision and mission, performance metrics, and interrelationship of the NIF Operations organization with other directorate and laboratory organizations. This document also provides a listing of roles and responsibilities, core processes, procedures, authority matrices, change control boards, and other information necessary for successfully functioning in the NIF Operations organization. This document, the NIF Shot Operations Plan, and the NIF Maintenance Plan together represent the primary documents satisfying our Conduct of Operations compliance requirement.« less
Medicare part D data: major changes on the horizon.
Greenwald, Leslie M
2007-10-01
The 3 primary administrative data sets developed by the Centers for Medicare and Medicaid services (CMS) to support the Medicare Part D program implementation represent a valuable source of data for health services researchers. This paper describes the structure of the Medicare Part D program and the related databases, and discusses their utilization for research purposes. The Medicare Part D administrative data include information on plan benefits (integrated into the Health Plan Management System), beneficiary enrollment files, and prescription drug event (PDE) claims-type data. The enrollment data may be of use in investigating the benefits and plan types that appeal to beneficiaries, but their application is limited by the fact that, although individual beneficiaries' enrollment choices are recorded, only summary enrollment data are currently publicly available. PDE data are likely to be of most interest to researchers as they are detailed (including beneficiary identifiers, contract identifiers pharmacy provider information on drugs provided, drug cost, and insurance status), beneficiary-specific (allowing them to be linked to beneficiary characteristics), and an unusual output for a program reimbursed under a capitation-based system. Because PDE data are highly sensitive, only summary data on the number of Part D prescriptions filled are publicly available. Although the data collected in relation to the Medicare Part D program could be applied to many questions of interest to health services researchers, their utility is limited by the sensitive natures of many of these data, making it difficult currently to obtain access for research purposes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report summarizes significant FY93 programmatic information and accomplishments relevant to the individual activities within the Office of Technology Development Program for Research, Development, Demonstration, Testing, and Evaluation (RDDT&E). A brief discussion of the mission of the Office of Environmental Restoration and Waste Management (EM) and the Office of Technology Development is presented. An overview is presented of the major problem areas confronting DOE. These problem areas include: groundwater and soils cleanup; waste retrieval and processing; and pollution prevention. The organizational elements within EM are highlighted. An EM-50 Funding Summary for FY92 and FY93 is also provided. RDDT&E programs aremore » discussed and their key problem areas are summarized. Three salient program-formulating concepts are explained. They are: Integrated Demonstrations, Integrated Programs, and the technology window of opportunity. Detailed information for each of the programs within RDDT&E is presented and includes a fact sheet, a list of technical task plans and an accomplishments and objectives section.« less
Setting up a pediatric robotic urology program: A USA institution experience.
Murthy, Prithvi B; Schadler, Eric D; Orvieto, Marcelo; Zagaja, Gregory; Shalhav, Arieh L; Gundeti, Mohan S
2018-02-01
Implementing a robotic urological surgery program requires institutional support, and necessitates a comprehensive, detail-oriented plan that accounts for training, oversight, cost and case volume. Given the prevalence of robotic surgery in adult urology, in many instances it might be feasible to implement a pediatric robotic urology program within the greater context of adult urology. This involves, from an institutional standpoint, proportional distribution of equipment cost and operating room time. However, the pediatric urology team primarily determines goals for volume expansion, operative case selection, resident training and surgical innovation within the specialty. In addition to the clinical model, a robust economic model that includes marketing must be present. This review specifically highlights these factors in relationship to establishing and maintaining a pediatric robotic urology program. In addition, we share our data involving robot use over the program's first nine years (December 2007-December 2016). © 2017 The Japanese Urological Association.
History of Reliability and Quality Assurance at Kennedy Space Center
NASA Technical Reports Server (NTRS)
Childers, Frank M.
2004-01-01
This Kennedy Historical Document (KHD) provides a unique historical perspective of the organizational and functional responsibilities for the manned and un-manned programs at Kennedy Space Center, Florida. As systems become more complex and hazardous, the attention to detailed planning and execution continues to be a challenge. The need for a robust reliability and quality assurance program will always be a necessity to ensure mission success. As new space missions are defined and technology allows for continued access to space, these programs cannot be compromised. The organizational structure that has provided the reliability and quality assurance functions for both the manned and unmanned programs has seen many changes since the first group came to Florida in the 1950's. The roles of government and contractor personnel have changed with each program and organizational alignment has changed based on that responsibility. The organizational alignment of the personnel performing these functions must ensure independent assessment of the processes.
The software analysis project for the Office of Human Resources
NASA Technical Reports Server (NTRS)
Tureman, Robert L., Jr.
1994-01-01
There were two major sections of the project for the Office of Human Resources (OHR). The first section was to conduct a planning study to analyze software use with the goal of recommending software purchases and determining whether the need exists for a file server. The second section was analysis and distribution planning for retirement planning computer program entitled VISION provided by NASA Headquarters. The software planning study was developed to help OHR analyze the current administrative desktop computing environment and make decisions regarding software acquisition and implementation. There were three major areas addressed by the study: current environment new software requirements, and strategies regarding the implementation of a server in the Office. To gather data on current environment, employees were surveyed and an inventory of computers were produced. The surveys were compiled and analyzed by the ASEE fellow with interpretation help by OHR staff. New software requirements represented a compilation and analysis of the surveyed requests of OHR personnel. Finally, the information on the use of a server represents research done by the ASEE fellow and analysis of survey data to determine software requirements for a server. This included selection of a methodology to estimate the number of copies of each software program required given current use and estimated growth. The report presents the results of the computing survey, a description of the current computing environment, recommenations for changes in the computing environment, current software needs, management advantages of using a server, and management considerations in the implementation of a server. In addition, detailed specifications were presented for the hardware and software recommendations to offer a complete picture to OHR management. The retirement planning computer program available to NASA employees will aid in long-range retirement planning. The intended audience is the NASA civil service employee with several years until retirement. The employee enters current salary and savings information as well as goals concerning salary at retirement, assumptions on inflation, and the return on investments. The program produces a picture of the employee's retirement income from all sources based on the assumptions entered. A session showing features of the program was conducted for key personnel at the Center. After analysis, it was decided to offer the program through the Learning Center starting in August 1994.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silvas, A. J.
The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on themore » NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.« less
2002 Computing and Interdisciplinary Systems Office Review and Planning Meeting
NASA Technical Reports Server (NTRS)
Lytle, John; Follen, Gregory; Lopez, Isaac; Veres, Joseph; Lavelle, Thomas; Sehra, Arun; Freeh, Josh; Hah, Chunill
2003-01-01
The technologies necessary to enable detailed numerical simulations of complete propulsion systems are being developed at the NASA Glenn Research Center in cooperation with NASA Glenn s Propulsion program, NASA Ames, industry, academia and other government agencies. Large scale, detailed simulations will be of great value to the nation because they eliminate some of the costly testing required to develop and certify advanced propulsion systems. In addition, time and cost savings will be achieved by enabling design details to be evaluated early in the development process before a commitment is made to a specific design. This year s review meeting describes the current status of the NPSS and the Object Oriented Development Kit with specific emphasis on the progress made over the past year on air breathing propulsion applications for aeronautics and space transportation applications. Major accomplishments include the first 3-D simulation of the primary flow path of a large turbofan engine in less than 15 hours, and the formal release of the NPSS Version 1.5 that includes elements of rocket engine systems and a visual based syntax layer. NPSS and the Development Kit are managed by the Computing and Interdisciplinary Systems Office (CISO) at the NASA Glenn Research Center and financially supported in fiscal year 2002 by the Computing, Networking and Information Systems (CNIS) project managed at NASA Ames, the Glenn Aerospace Propulsion and Power Program and the Advanced Space Transportation Program.
Lawlor, Debbie A; Peters, Tim J; Howe, Laura D; Noble, Sian M; Kipping, Ruth R; Jago, Russell
2013-07-24
The Active For Life Year 5 (AFLY5) randomised controlled trial protocol was published in this journal in 2011. It provided a summary analysis plan. This publication is an update of that protocol and provides a detailed analysis plan. This update provides a detailed analysis plan of the effectiveness and cost-effectiveness of the AFLY5 intervention. The plan includes details of how variables will be quality control checked and the criteria used to define derived variables. Details of four key analyses are provided: (a) effectiveness analysis 1 (the effect of the AFLY5 intervention on primary and secondary outcomes at the end of the school year in which the intervention is delivered); (b) mediation analyses (secondary analyses examining the extent to which any effects of the intervention are mediated via self-efficacy, parental support and knowledge, through which the intervention is theoretically believed to act); (c) effectiveness analysis 2 (the effect of the AFLY5 intervention on primary and secondary outcomes 12 months after the end of the intervention) and (d) cost effectiveness analysis (the cost-effectiveness of the AFLY5 intervention). The details include how the intention to treat and per-protocol analyses were defined and planned sensitivity analyses for dealing with missing data. A set of dummy tables are provided in Additional file 1. This detailed analysis plan was written prior to any analyst having access to any data and was approved by the AFLY5 Trial Steering Committee. Its publication will ensure that analyses are in accordance with an a priori plan related to the trial objectives and not driven by knowledge of the data. ISRCTN50133740.
NASA Technical Reports Server (NTRS)
Hanley, G.
1978-01-01
Volume 6 of the SPS Concept Definition Study is presented and also incorporates results of NASA/MSFC in-house effort. This volume includes a supporting research and technology summary. Other volumes of the final report that provide additional detail are as follows: (1) Executive Summary; (2) SPS System Requirements; (3) SPS Concept Evolution; (4) SPS Point Design Definition; (5) Transportation and Operations Analysis; and Volume 7, SPS Program Plan and Economic Analysis.
NASA Technical Reports Server (NTRS)
Hanley, G.
1978-01-01
Three appendixes in support of Volume 7 are contained in this document. The three appendixes are: (1) Satellite Power System Work Breakdown Structure Dictionary; (2) SPS cost Estimating Relationships; and (3) Financial and Operational Concept. Other volumes of the final report that provide additional detail are: Executive Summary; SPS Systems Requirements; SPS Concept Evolution; SPS Point Design Definition; Transportation and Operations Analysis; and SPS Technology Requirements and Verification.
1973-02-01
No Deec F3202 B P egcak what(oniud 8 +Yes Fe d . Each phase is discussed in detail in Section 3 of this report. The logic flow of BURFA is shown in...Clas Flowchart for Function INFST D-14 ASSGN Call SORT Initialize Berth Facilities J=1,3 2 ISN I A Ship Yet Assigned E Berth No Determine N1 , N2 3 K N1
The Quest for Contact: NASA's Search for Extraterrestrial Intelligence
NASA Technical Reports Server (NTRS)
1992-01-01
This video details the history and current efforts of NASA's Search for Extraterrestrial Intelligence program. The video explains the use of radiotelescopes to monitor electromagnetic frequencies reaching the Earth, and the analysis of this data for patterns or signals that have no natural origin. The video presents an overview of Frank Drake's 1960 'Ozma' experiment, the current META experiment, and planned efforts incorporating an international Deep Space Network of radiotelescopes that will be trained on over 800 stars.
Commercial equipment loads: End-Use Load and Consumer Assessment Program (ELCAP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pratt, R.G.; Williamson, M.A.; Richman, E.E.
1990-07-01
The Office of Energy Resources of the Bonneville Power Administration is generally responsible for the agency's power and conservation resource planning. As associated responsibility which supports a variety of office functions is the analysis of historical trends in and determinants of energy consumption. The Office of Energy Resources' End-Use Research Section operates a comprehensive data collection program to provide pertinent information to support demand-side planning, load forecasting, and demand-side program development and delivery. Part of this on-going program is known as the End-Use Load and Consumer Assessment Program (ELCAP), an effort designed to collect electricity usage data through direct monitoringmore » of end-use loads in buildings. This program is conducted for Bonneville by the Pacific Northwest Laboratory. This report provides detailed information on electricity consumption of miscellaneous equipment from the commercial portion of ELCAP. Miscellaneous equipment includes all commercial end-uses except heating, ventilating, air conditioning, and central lighting systems. Some examples of end-uses covered in this report are office equipment, computers, task lighting, refrigeration, and food preparation. Electricity consumption estimates, in kilowatt-hours per square food per year, are provided for each end-use by building type. The following types of buildings are covered: office, retail, restaurant, grocery, warehouse, school, university, and hotel/motel. 6 refs., 35 figs., 12 tabs.« less
Transition and closeout of the Fernald Closure Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bilson, H.E.; Terry, T.; Reising, J.
The U.S. Department of Energy (DOE) and Fluor Fernald have completed the majority of the cleanup of the Fernald Site. The over 1,000 acre complex for processing uranium has been demolished and soil contamination has been remediated. With acres of wetlands and prairies replacing the buildings and waste pits. At the end of the project the focus shifted to developing demonstrating the completion of the project and the contract, as well as ensuring a smooth transition of the facility from the DOE's Environmental Management (EM) Program to the DOE's Legacy Management (LM) Program. Working with the DOE, each portion ofmore » the closure contract was examined for specific closure definition. From this negotiation effort the Comprehensive Exit and Transition Plan (CE/T Plan) was written. The CE/T Plan is intended to assist DOE in the analysis that the site is ready for transfer into long-term stewardship (LTS) (also referred to as legacy management) and that Fluor Fernald, Inc. has satisfactorily completed the closure contract statement of work elements. Following the Lessons Learned from the closure of the Rocky Flats Site, the DOE's Legacy Management Program created a matrix of Transition Elements required to ensure adequate information was in place to allow the new prime contractor to perform the Legacy Management scope of work. The transition plan included over 1,000 elements broken down into functional areas and relied on specific Fernald Responsibility Transition Packages (RTPs) for detailed transition actions. The template for Closure and Transition Planning used at the Fernald Site was developed using the best Lessons Learned from across the DOE Complex. The template could be used for other sites, and lessons learned from this closure and transition will be appropriate for all closure projects. (authors)« less
The organizations for space education and outreach programs in the Republic of Korea
NASA Astrophysics Data System (ADS)
Lee, Jeongwon; Jo, Hyun-Jung; Choi, Jae Dong
2011-09-01
Korea has a short history in space development compared to neighboring countries like Japan, China, India and Russia. During the past 20 years, Korea has focused on developing satellite and rocket space technology under the national space development plan. KOMPSAT-1 and 2, and KSLV-1 are the results of the selection and concentration policy of the Korean government. Due to the arduous mission of developing hardware oriented space technology, the topic of space education and outreach for the general public has not received much in the national space program. But recently, the Korean government has begun planning a space science outreach program in the detailed action plan of the mid-long term national space development plan. This paper introduces and analyzes the organizations performing space education and outreach programs for primary and secondary schools in the Republic of Korea. "Young Astronaut Korea (YAK)" is one such program. This is a non-profit organization established to provide space education for students in 1989 when Korea just started its space development program. "YAK" is a unique group in Korea for space education and outreach activities because it is organized by branches at each school in the nation and it is much like the Boy Scout and Girl Scout programs. Space Science Museum and National Youth Space Center (NYSC), which are located near NARO space center in the southernmost part of the Korean peninsula are other examples of space education and outreach programs. NARO space center, which is the only launch site in Korea became the center of public interest by showing the KSLV-1 launch in 2009 and will be expected to play a key role for the space education of students in the Republic of Korea. The NYSC will perform many mission oriented space education programs for students as Space Camp in the USA does. This paper introduces the status of the space education and outreach programs of each organization and presents the future direction of space education and outreach for the Korean public and students. If these three organizations cooperate with each other and develop systematic programs of space education and outreach for the people, they will prepare a base for growth and progress in future space science and technology in Korea.
Aerospace Safety Advisory Panel
NASA Technical Reports Server (NTRS)
2002-01-01
This Annual Report of the Aerospace Safety Advisory Panel (ASAP) presents results of activities during calendar year 2001. The year was marked by significant achievements in the Space Shuttle and International Space Station (ISS) programs and encouraging accomplishments by the Aerospace Technology Enterprise. Unfortunately, there were also disquieting mishaps with the X-43, a LearJet, and a wind tunnel. Each mishap was analyzed in an orderly process to ascertain causes and derive lessons learned. Both these accomplishments and the responses to the mishaps led the Panel to conclude that safety and risk management is currently being well served within NASA. NASA's operations evidence high levels of safety consciousness and sincere efforts to place safety foremost. Nevertheless, the Panel's safety concerns have never been greater. This dichotomy has arisen because the focus of most NASA programs has been directed toward program survival rather than effective life cycle planning. Last year's Annual Report focused on the need for NASA to adopt a realistically long planning horizon for the aging Space Shuttle so that safety would not erode. NASA's response to the report concurred with this finding. Nevertheless, there has been a greater emphasis on current operations to the apparent detriment of long-term planning. Budget cutbacks and shifts in priorities have severely limited the resources available to the Space Shuttle and ISS for application to risk-reduction and life-extension efforts. As a result, funds originally intended for long-term safety-related activities have been used for operations. Thus, while safety continues to be well served at present, the basis for future safety has eroded. Section II of this report develops this theme in more detail and presents several important, overarching findings and recommendations that apply to many if not all of NASA's programs. Section III of the report presents other significant findings, recommendations and supporting material applicable to specific program areas. Appendix A presents a list of Panel members. Appendix B contains the reaction of the ASAP to NASA's response to the calendar year 2000 findings and recommendations. In accordance with a practice started last year, this Appendix includes brief narratives as well as classifications of the responses as 'open,' 'closed,' or 'continuing.' Appendix C details the Panel's activities during the reporting period.
Medicare Contracting Risk/Medicare Risk Contracting: A Life-Cycle View from Twelve Markets
Hurley, Robert E; Grossman, Joy M; Strunk, Bradley C
2003-01-01
Objective To examine the evolution of the Medicare HMO program from 1996 to 2001 in 12 nationally representative urban markets by exploring how the separate and confluent influences of government policy initiatives and health plans' strategic aims and operational experience affected the availability of HMOs to Medicare beneficiaries. Data Source Qualitative data gathered from 12 nationally representative urban communities with more than 200,000 residents each, in tandem with quantitative information from the Centers for Medicare and Medicaid Services and other sources. Study Design Detailed interview protocols, developed as part of the multiyear, multimethod Community Tracking Study of the Center for Studying Health System Change, were used to conduct three rounds of interviews (1996, 1998, and 2000–2001) with health plans and providers in 12 nationally representative urban communities. A special focus during the third round of interviews was on gathering information related to Medicare HMOs' experience in the previous four years. This information was used to build on previous research to develop a longitudinal perspective on health plans' experience in Medicare's HMO program. Principal Findings From 1996 to 2001, the activities and expectations of health plans in local markets underwent a rapid and dramatic transition from enthusiasm for the Medicare HMO product, to abrupt reconsideration of interest corresponding to changes in the Balanced Budget Act of 1997, on to significant retrenchment and disillusionment. Policy developments were important in their own right, but they also interacted with shifts in the strategic aims and operational experiences of health plans that reflect responses to insurance underwriting cycle pressures and pushback from providers. Conclusion The Medicare HMO program went through a substantial reversal of fortune during the study period, raising doubts about whether its downward course can be altered. Market-level analysis reveals that virtually all momentum for the program has been lost and that enrollment is shrinking back to the levels and locations found in the mid-1990s. PMID:12650373
Medicare contracting risk/Medicare risk contracting: a life-cycle view from twelve markets.
Hurley, Robert E; Grossman, Joy M; Strunk, Bradley C
2003-02-01
To examine the evolution of the Medicare HMO program from 1996 to 2001 in 12 nationally representative urban markets by exploring how the separate and confluent influences of government policy initiatives and health plans' strategic aims and operational experience affected the availability of HMOs to Medicare beneficiaries. Qualitative data gathered from 12 nationally representative urban communities with more than 200,000 residents each, in tandem with quantitative information from the Centers for Medicare and Medicaid Services and other sources. Detailed interview protocols, developed as part of the multiyear, multimethod Community Tracking Study of the Center for Studying Health System Change, were used to conduct three rounds of interviews (1996, 1998, and 2000-2001) with health plans and providers in 12 nationally representative urban communities. A special focus during the third round of interviews was on gathering information related to Medicare HMOs' experience in the previous four years. This information was used to build on previous research to develop a longitudinal perspective on health plans' experience in Medicare's HMO program. From 1996 to 2001, the activities and expectations of health plans in local markets underwent a rapid and dramatic transition from enthusiasm for the Medicare HMO product, to abrupt reconsideration of interest corresponding to changes in the Balanced Budget Act of 1997, on to significant retrenchment and disillusionment. Policy developments were important in their own right, but they also interacted with shifts in the strategic aims and operational experiences of health plans that reflect responses to insurance underwriting cycle pressures and pushback from providers. The Medicare HMO program went through a substantial reversal of fortune during the study period, raising doubts about whether its downward course can be altered. Market-level analysis reveals that virtually all momentum for the program has been lost and that enrollment is shrinking back to the levels and locations found in the mid-1990s.
NASA Astrophysics Data System (ADS)
Timme, Nicholas; Baird, Michael; Bennett, Jake; Fry, Jason; Garrison, Lance; Maltese, Adam
2013-05-01
For the past two years, the Foundations in Physics and Mathematics (FPM) summer program has been held at Indiana University in order to fulfill two goals: provide additional physics and mathematics instruction at the high school level, and provide physics graduate students with experience and autonomy in designing curricula and teaching courses. In this paper we will detail changes made to the program for its second year and the motivation for these changes, as well as implications for future iterations of the program. We gauge the impact of the changes on student performance using pre-/post-test scores, student evaluations, and anecdotal evidence. These data show that the program has a positive impact on student knowledge and this impact was greater in magnitude in the second year of the program. We attribute this improvement primarily to the inclusion of more inquiry-driven activities. All activities, worksheets, and lesson plans used in the program are available online.
27. Photographic copy of Mezzanine Plan, Roof Plan and Details ...
27. Photographic copy of Mezzanine Plan, Roof Plan and Details (The Ballinger Company, April 12, 1955). In files of the City of Philadelphia, Division of Aviation, Terminal E, Philadelphia International Airport. Reprinted with permission of the Division of Aviation. - TWA Maintenance Hangar, South side of Tinicum Island Road, Philadelphia International Airport, Philadelphia, Philadelphia County, PA
3. PHOTOGRAPHIC COPY OF MASTER PLAN, DETAIL SITE PLAN, 7TH ...
3. PHOTOGRAPHIC COPY OF MASTER PLAN, DETAIL SITE PLAN, 7TH CAVALRY BUILDINGS, DATED SEPTEMBER 10, 1951, SEE ARROW, DRAWING # BM-036, COPY ON FILE IN THE ENVIRONMENTAL MANAGEMENT OFFICE, FORT BLISS - Fort Bliss, 7th Cavalry Buildings, U.S. Army Air Defence Artillery Center & Fort Bliss, El Paso, El Paso County, TX
37. ELECTRICAL PLAN AND DETAILS. SHOWS PLANNED LOCATION OF PORTABLE ...
37. ELECTRICAL PLAN AND DETAILS. SHOWS PLANNED LOCATION OF PORTABLE GENERATOR. FUNCTION OF FOUR-FOOT SQUARE PIT IS SHOWN AS 'D.C. POWER SUPPLY PIT.' F.C. TORKELSON DRAWING NUMBER 842-ARVFS-701-E-1. INEL INDEX CODE NUMBER: 075 0701 10 851 151973. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID
1989-12-01
57 Table 5 Sensitivity Analysis - Point of Pines LPP 61 Table 6 Plan Comparison 64 Table 7 NED Plan Project Costs 96 Table 8 Estimated Operation...Costs 99 Table 13 Selected Plan/Estimated Annual Benefits 101 Table 14 Comparative Impacts - NED Regional Floodgate Plan 102 Table 15 Economic Analysis ...Includes detailed descriptions, plans and profiles and design considerations of the selected plan; coastal analysis of the shorefront; detailed project
Circumpolar biodiversity monitoring program (CBMP): Coastal expert workshop meeting report
Anderson, Rebecca D.; McLennan, Donald; Thomson, Laura; Wegeberg, Susse; Pettersvik Arvnes, Maria; Sergienko, Liudmila; Behe, Carolina; Moss-Davies, Pitseolak; Fritz, Stacey; Christensen, Thomas K.; Price, Courtney
2016-01-01
The Coastal Expert Workshop, which took place in Ottawa, Canada from March 1 to 3, 2016, initiated the development of the Arctic Coastal Biodiversity Monitoring Plan (Coastal Plan). Meeting participants, including northern residents, representatives from industry, non-governmental organisations (NGOs), academia, and government regulators and agencies from across the circumpolar Arctic, discussed current biodiversity monitoring efforts, key issues facing biodiversity in Arctic coastal areas, and collectively identified monitoring indicators, or Focal Ecosystem Components (FECs). On February 29, the day before the workshop, a full day was allocated to Traditional Knowledge (TK) holders to meet and elucidate how this important knowledge can be included in the process of building the Coastal Plan and monitoring biodiversity in Arctic coastal areas, along with scientific data and variables. This document provides 1) background information about the Circumpolar Biodiversity Monitoring Programme and the Coastal Expert Monitoring Group, 2) overviews on workshop presentations and breakout sessions, and 3) details regarding outcomes of the workshop that will inform the drafting of the Coastal Plan.
Advanced Environmental Monitoring and Control Program: Strategic Plan
NASA Technical Reports Server (NTRS)
Schmidt, Gregory
1996-01-01
Human missions in space, from short-duration shuttle missions lasting no more than several days to the medium-to-long-duration missions planned for the International Space Station, face a number of hazards that must be understood and mitigated for the mission to be carried out safely. Among these hazards are those posed by the internal environment of the spacecraft itself; through outgassing of toxic vapors from plastics and other items, failures or off-nominal operations of spacecraft environmental control systems, accidental exposure to hazardous compounds used in experiments: all present potential hazards that while small, may accumulate and pose a danger to crew health. The first step toward mitigating the dangers of these hazards is understanding the internal environment of the spacecraft and the compounds contained within it. Future spacecraft will have integrated networks of redundant sensors which will not only inform the crew of hazards, but will pinpoint the problem location and, through analysis by intelligent systems, recommend and even implement a course of action to stop the problem. This strategic plan details strategies to determine NASA's requirements for environmental monitoring and control systems for future spacecraft, and goals and objectives for a program to answer these needs.
Schnall, Peter; Dobson, Marnie; Israel, Leslie; Landsbergis, Paul; Galassetti, Pietro; Pontello, Andria; Kojaku, Stacey; Baker, Dean
2011-01-01
Firefighters and police officers have the third highest prevalence of obesity among 41 male occupational groups in the United States (US). However, few studies have examined the relationship of firefighter working conditions and health behaviors with obesity. This paper presents a theoretical framework describing the relationship between working conditions, health behaviors, and obesity in firefighters. In addition, the paper describes a detailed study plan for exploring the role of occupational and behavioral risk factors in the development of obesity in firefighters enrolled in the Orange County Fire Authority Wellness Fitness Program. The study plan will be described with emphasis on its methodological merits: adopting a participatory action research approach, developing a firefighter-specific work and health questionnaire, conducting both a cross-sectional epidemiological study using the questionnaire and a sub-study to assess the validity of the questionnaire with dietary intake and physical activity measures, and evaluating the strengths and weaknesses of the body mass index as an obesity measure in comparison to skinfold-based percent body fat. The study plan based on a theoretical framework can be an essential first step for establishing effective intervention programs for obesity among professional and voluntary firefighters. PMID:22953214
Choi, Bongkyoo; Schnall, Peter; Dobson, Marnie; Israel, Leslie; Landsbergis, Paul; Galassetti, Pietro; Pontello, Andria; Kojaku, Stacey; Baker, Dean
2011-12-01
Firefighters and police officers have the third highest prevalence of obesity among 41 male occupational groups in the United States (US). However, few studies have examined the relationship of firefighter working conditions and health behaviors with obesity. This paper presents a theoretical framework describing the relationship between working conditions, health behaviors, and obesity in firefighters. In addition, the paper describes a detailed study plan for exploring the role of occupational and behavioral risk factors in the development of obesity in firefighters enrolled in the Orange County Fire Authority Wellness Fitness Program. The study plan will be described with emphasis on its methodological merits: adopting a participatory action research approach, developing a firefighter-specific work and health questionnaire, conducting both a cross-sectional epidemiological study using the questionnaire and a sub-study to assess the validity of the questionnaire with dietary intake and physical activity measures, and evaluating the strengths and weaknesses of the body mass index as an obesity measure in comparison to skinfold-based percent body fat. The study plan based on a theoretical framework can be an essential first step for establishing effective intervention programs for obesity among professional and voluntary firefighters.
NASA Technical Reports Server (NTRS)
1978-01-01
Volume 2 provides a preliminary assessment of the impact of the Satellite Power System (SPS) on the environment in a technically detailed format more suitable for peer review than the executive summary of Vol. 1. It serves to integrate and assimilate information that has appeared in documents referenced herein and to focus on issues that are purely environmental. It discloses the state-of-knowledge as perceived from recently completed DOE-sponsored studies and defines prospective research and study programs that can advance the state-of-knowledge and provide an expanded data base for use in an assessment planned for 1980. Alternatives for research that may be implemented in order to achieve this advancement are also discussed.
50. Photograph of an original construction drawing, dated August 1927, ...
50. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities Planning Office, Iowa State University, Ames, Iowa. EXTERIOR DETAILS DETAIL ELEVATION, PLAN, AND WALL CROSS SECTION AT FRONT ENTRANCE PORTICO; EXTERIOR WALL AND OPENING DETAILS; AND OTHER EXTERIOR DETAILS; SHEET NO. 8 OF 10 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA
Development of an Asia-Pacific regional network for public health.
Loos, G P
1995-01-01
As public health by its very nature is multi-disciplinary, it may benefit individual programs to formulate a regional network, joining researchers and academics across programs. This approach may afford extended benefits, such as the establishment of regional health surveillance systems and collaborative funding initiatives. To explore this potential, member institutions comprising the Asia-Pacific Academic Consortium for Public Health provided data to form an aggregate profile of cross-institutional expertise and resources, which was presented to Health Specialists at the Asian Development Bank. The study provided a foundation for a planned regional network. A four-pronged approach was proffered detailing concurrent aspects of development: 1) network formation and expansion, 2) research coordination, 3) cross-institutional communication and instruction, and 4) promotion of self-sufficiency. The proposed plan affords the groundwork for an improved approach to public health research and practice that builds upon the established Consortium, and encourages new horizons. Regionalization is an increasing phenomenon world wide, and should be furthered as a concept for improved public health intervention and control.
Implementing a clinical ethics needs assessment survey: results of a pilot study (part 2 of 2).
Frolic, Andrea; Andreychuk, Sandra; Seidlitz, Wendy; Djuric-Paulin, Angela; Flaherty, Barb; Jennings, Barb; Peace, Donna
2013-03-01
This paper details the implementation of the Clinical Ethics Needs Assessment Survey (CENAS) through a pilot study in five units within Hamilton Health Sciences. We describe how these pilot sites were selected, how we implemented the survey, the significant results and our interpretation of the findings. The primary goal of this paper is to share our experiences using this tool, specifically the challenges we encountered conducting a staff ethics needs assessment across different units in a large teaching hospital, and the facilitators to our success. We conclude with a discussion of the limitations of this study, our plans for using the results to develop a proactive ethics education strategy, and suggestions for other organizations wishing to adapt the CENAS to assess their staff ethics needs. Our secondary goal is to advance the "quality agenda" for ethics programs by demonstrating how a tool like the CENAS can be used to design more effective educational interventions, and to support strategic planning and proactive priority-setting for ethics programs.
The CPAT 2.0.2 Domain Model - How CPAT 2.0.2 "Thinks" From an Analyst Perspective.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Waddell, Lucas; Muldoon, Frank; Melander, Darryl J.
To help effectively plan the management and modernization of their large and diverse fleets of vehicles, the Program Executive Office Ground Combat Systems (PEO GCS) and the Program Executive Office Combat Support and Combat Service Support (PEO CS &CSS) commissioned the development of a large - scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This reportmore » contains a description of the organizational fleet structure and a thorough explanation of the business rules that the CPAT formulation follows involving performance, scheduling, production, and budgets. This report, which is an update to the original CPAT domain model published in 2015 (SAND2015 - 4009), covers important new CPAT features. This page intentionally left blank« less
Evolution of systems concepts for a 100 kWe class Space Nuclear Power System
NASA Technical Reports Server (NTRS)
Katucki, R.; Josloff, A.; Kirpich, A.; Florio, F.
1985-01-01
Conceptual designs for the SP-100 Space Nuclear Power System have been prepared that meet baseline, backup and growth program scenarios. Near-term advancement in technology was considered in the design of the Baseline Concept. An improved silicon-germanium thermoelectric technique is used to convert the heat from a fast-spectrum, liquid lithium cooled reactor. This system produces a net power of 100 kWe with a 10-year end of life, under the specific constraints of area and volume. Output of the Backup Concept is estimated to be 60 kWe for a 10-year end of life. This system differs from the Baseline Concept because currently available thermoelectric conversion is used from energy supplied by a liquid sodium cooled reactor. The Growth Concept uses Stirling engine conversion to produce 100 kWe within the constraints of mass and volume. The Growth Concept can be scaled up to produce a 1 MWe output that uses the same type reactor developed for the Baseline Concept. Assessments made for each of the program scenarios indicate the key development efforts needed to initiate detailed design and hardware program phases. Development plans were prepared for each scenario that detail the work elements and show the program activities leading to a state of flight readiness.
Transpiration cooled throat for hydrocarbon rocket engines
NASA Technical Reports Server (NTRS)
May, Lee R.; Burkhardt, Wendel M.
1991-01-01
The objective for the Transpiration Cooled Throat for Hydrocarbon Rocket Engines Program was to characterize the use of hydrocarbon fuels as transpiration coolants for rocket nozzle throats. The hydrocarbon fuels investigated in this program were RP-1 and methane. To adequately characterize the above transpiration coolants, a program was planned which would (1) predict engine system performance and life enhancements due to transpiration cooling of the throat region using analytical models, anchored with available data; (2) a versatile transpiration cooled subscale rocket thrust chamber was designed and fabricated; (3) the subscale thrust chamber was tested over a limited range of conditions, e.g., coolant type, chamber pressure, transpiration cooled length, and coolant flow rate; and (4) detailed data analyses were conducted to determine the relationship between the key performance and life enhancement variables.
Online access to international aerospace science and technology
NASA Technical Reports Server (NTRS)
Lahr, Thomas F.; Harrison, Laurie K.
1993-01-01
The NASA Aerospace Database contains over 625,000 foreign R&D documents from 1962 to the present from over 60 countries worldwide. In 1991 over 26,000 new non-U.S. entries were added from a variety of innovative exchange programs. An active international acquisitions effort by the NASA STI Program seeks to increase the percentage of foreign data in the coming years, focusing on Japan, the Commonwealth of Independent States, Western Europe, Australia, and Canada. It also has plans to target China, India, Brazil, and Eastern Europe in the future. The authors detail the resources the NASA Aerospace Database offers in the international arena, the methods used to gather this information, and the STI Program's initiatives for maintaining and expanding the percentage of international information in this database.
ATF Neutron Irradiation Program Irradiation Vehicle Design Concepts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Geringer, J. W.; Katoh, Yutai; Howard, Richard H.
The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post irradiation examination and characterizationmore » of irradiated materials and the shipment of irradiated materials to Japan. This report discusses the conceptual design, the development and irradiation of the test vehicles.« less
Exploration planning in the context of human exploration and development of the Moon
NASA Technical Reports Server (NTRS)
Duke, Michael B.; Morrison, Donald A.
1993-01-01
It is widely believed that the next step beyond low Earth orbit in attaining the United States' stated goal of 'Expanding human presence beyond the Earth' should be to reestablish a lunar capability, building on the Apollo program, and preparing the way for eventual human missions to Mars. The Moon offers important questions in planetary and Earth science, can provide a unique platform for making astronomical observations of high resolution and sensitivity, and can be in the development path for unlocking resources of the inner solar system to support space activities and return benefits to Earth. NASA's Office of Exploration has undertaken the planning of future lunar exploration missions with the assistance of the Solar System Exploration Division in matters dealing with the quality of scientific data and the manner in which it will be made available to the scientific community. The initial elements of the proposed program include the Lunar Scout missions, which consist of two small identical spacecraft in polar orbit around the Moon, which can accomplish most of the objectives associated with previous proposals for Lunar Polar Orbiters. These missions would be followed by 'Artemis' landers, capable of emplacing up to 200 kg payloads anywhere on the Moon. In addition, the exploration program must incorporate data obtained from other missions, including the Galileo lunar flybys, the Clementine high orbital observations, and Japanese penetrator missions. In the past year, a rather detailed plan for a 'First Lunar Outpost (FLO)' which would place 4 astronauts on the lunar surface for 45 days has been developed as a possible initial step of a renewed human exploration program. In the coming year, the FLO concept will be reviewed and evolved to become more highly integrated with planning for the initial human exploration of Mars, which could come perhaps 5 years after the reestablishment of lunar capability. Both programs could benefit from the common development of systems and subsystems, where that is sensible from a performance perspective.
Geotechnical support and topical studies for nuclear waste geologic repositories
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-01-01
The present report lists the technical reviews and comments made during the fiscal year 1988 and summarizes the technical progress of the topical studies. In the area of technical assistance, there were numerous activities detailed in the next section. These included 24 geotechnical support activities, including reviews of 6 Study Plans (SP) and participation in 6 SP Review Workshops, review of one whole document Site Characterization Plan (SCP) and participation in the Assembled Document SCP Review Workshops by 6 LBL reviewers; the hosting of a DOE program review, the rewriting of the project statement of work, 2 trips to technicalmore » and planning meetings; preparation of proposed work statements for two new topics for DOE, and 5 instances of technical assistance to DOE. These activities are described in a Table in the following section entitled Geoscience Technical Support for Nuclear Waste Geologic Repositories.''« less