Sample records for program planning development

  1. 34 CFR 200.27 - Development of a schoolwide program plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...

  2. 34 CFR 200.27 - Development of a schoolwide program plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...

  3. 34 CFR 200.27 - Development of a schoolwide program plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...

  4. 34 CFR 200.27 - Development of a schoolwide program plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...

  5. Systems design study of the Pioneer Venus spacecraft. Volume 2. Preliminary program development plan

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The preliminary development plan for the Pioneer Venus program is presented. This preliminary plan treats only developmental aspects that would have a significant effect on program cost. These significant development areas were: master program schedule planning; test planning - both unit and system testing for probes/orbiter/ probe bus; ground support equipment; performance assurance; and science integration Various test planning options and test method techniques were evaluated in terms of achieving a low-cost program without degrading mission performance or system reliability. The approaches studied and the methodology of the selected approach are defined.

  6. 5 CFR 720.205 - Agency plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the Federal civil service system and a description of recruitment programs developed to increase... program plans and should be developed with full consideration of the agency's overall recruiting and...) AFFIRMATIVE EMPLOYMENT PROGRAMS Federal Equal Opportunity Recruitment Program § 720.205 Agency plans. (a) Each...

  7. National Data Program for the Marine Environment Technical Development Plan. Final Report, Volume Two.

    ERIC Educational Resources Information Center

    System Development Corp., Santa Monica, CA.

    A national data program for the marine environment is recommended. Volume 2 includes: (1) objectives, scope, and methodology; (2) summary of the technical development plan; (3) agency development plans - Great Lakes and coastal development and (4) marine data network development plans. (Author)

  8. Program Planning in Health Professions Education

    ERIC Educational Resources Information Center

    Schmidt, Steven W.; Lawson, Luan

    2018-01-01

    In this chapter, the major concepts from program planning in adult education will be applied to health professions education (HPE). Curriculum planning and program planning will be differentiated, and program development and planning will be grounded in a systems thinking approach.

  9. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  10. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.« less

  11. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall be...

  12. 24 CFR 984.201 - Action Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall be...

  13. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Fivemore » priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs.« less

  14. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.« less

  15. Momentum: "Developing Masterful Marketing Plans."

    ERIC Educational Resources Information Center

    Meservey, Lynne D.

    1988-01-01

    Describes how directors can plan and develop a written marketing plan which can increase enrollment at child care centers. Components of successful marketing plans include parent retention; program merchandising; staff and director training; sales promotions; networking; and enrichment programs/fundraising. (NH)

  16. 78 FR 25760 - Proposed Information Collection; Urban Park and Recreation Recovery Program Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ...--renovate or redesign existing close-to- home recreation facilities. Innovation--specific activities that... existing programs. Planning--development of a Recovery Action Program plan. The information collection... recreation system goals. Citizen involvement in the development of the Action Plan is required and may...

  17. The crucial role of the private sector.

    PubMed

    Barberis, M; Paxman, J M

    1986-12-01

    Private support for the development of family planning programs continues to grow and now includes industries that provide family planning services, commercial outlets that distribute contraceptives, community groups that help to build demand, private medical practitioners who include contraception as a part of health care, organizations that provide technical and financial assistance to developing country programs, pharmaceutical firms, and foundations that underwrite contraceptive research. Although the mix of private and public programs differs from country to country, these 2 family planning programs complement each other and often work in close partnership. The private sector has the advantages of being able to pioneer innovative programs the public sector is unwilling or unable to pursue, to bring foreign financial and technical assistance to developing countries without political implications, and to achieve financially self-sustaining family planning efforts that are linked to other development efforts. In many countries, the private sector has been instrumental in developing a national family planning program and in eliminating barriers to family planning in countries with restrictive laws and policies. The private sector has been especially important in pioneering grassroots programs that improve the status of women through education, health care, training, and economic opportunity.

  18. Preparing for High Technology: Robotics Programs. Research & Development Series No. 233.

    ERIC Educational Resources Information Center

    Ashley, William; And Others

    This guide is one of three developed to provide guidelines, information, and resources useful in planning and developing postsecondary technician training programs in high technology. It is specifically intended for program planners and developers in the initial stages of planning a new program or specialized option in robotics. (Two companion…

  19. 24 CFR 84.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Revision of budget and program... and Program Management § 84.25 Revision of budget and program plans. (a) The budget plan is the... required to report deviations from budget and program plans, and request prior approvals for budget and...

  20. 40 CFR 93.101 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded or Approved Under Title 23.... Transportation improvement program (TIP) means a transportation improvement program developed by a metropolitan... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) DETERMINING...

  1. The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan

    NASA Technical Reports Server (NTRS)

    Bronstein, L.; Kawamoto, Y.; Riberich, J. J.; Scope, J. R.; Forman, B. J.; Bergman, S. G.; Reisenfeld, S.

    1981-01-01

    The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.

  2. 20 CFR 632.255 - Program planning.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a)(1) In developing the summer program, the Native American grantee shall coordinate the summer plan..., except that 45 days prior to the beginning of the summer program and 45 days after the summer program...

  3. 20 CFR 632.255 - Program planning.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a)(1) In developing the summer program, the Native American grantee shall coordinate the summer plan..., except that 45 days prior to the beginning of the summer program and 45 days after the summer program...

  4. Phase C/D program development plan. Volume 1: Program plan

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.

  5. Programs of Study and Support Services Guide. Workforce Development Education.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh.

    This document was developed to assist local school systems in North Carolina in planning effective and comprehensive workforce development education programs. It contains information about planning, required resources, instructional guidelines, and program area offerings. The guide is organized in three parts. Part I provides a program description…

  6. Space tug point design study. Volume 4: Program requirements

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A study was conducted to determine the configuration of a space tug and to predict the performance parameters. The program plans and planning data generated in support of the tug development program are presented. The preliminary plans and supporting planning data emphasize the following requirements: (1) maintenance and refurbishment, (2) technology development, (3) production, (4) test facilities, (5) quality control, and (6) scheduling.

  7. Developing an interdisciplinary certificate program in transportation planning.

    DOT National Transportation Integrated Search

    2010-09-01

    This project develops and implements a graduate certificate in transportation planning. Texas A&M : University (A&M) currently offers instruction in transportation through its Master of Urban Planning (MUP) : and Civil Engineering (CE) programs; howe...

  8. The development of rural area residence based on participatory planning case study: A rural residential area of Pucungrejo village, Magelang through "neighborhood development" program

    NASA Astrophysics Data System (ADS)

    KP, R. M. Bambang Setyohadi; Wicaksono, Dimas

    2018-03-01

    The poverty is one of the prevailing problems in Indonesia until now. Even a change of the era of governance has not succeeded in eradicating the problem of poverty. The program of poverty alleviation program has always been a focus in the budget allocation in all era of leadership in Indonesia. Those programs were strategic because it prepared the foundation of community self-reliance in the form of representative, entrenched and conducive community leadership institutions to develop of social capital of society in the future. Developing an area of the village requires an integrated planning (Grand Design) to figure out the potential and the problems existing in the rural area as well as the integration of the rural area surrounding. In addition, the grand design needs to be synchronized to the more comprehensive spatial plan with a hierarchical structure such as RTBL, RDTRK / RRTRK, RTRK, and RTRW. This rural area management plan can be oriented or refer to the pattern developed from neighborhood Development program which is part of the PNPM Mandiri program. The neighborhood development program is known as residential area development plan whose process involves of the entire community. Therefore, the regional development up to the scale of the environment requires the planning phase. Particularly, spatial planning which emphasizes the efforts to optimize sectorial development targets to be integrated into an integrated development process must be conducted, in addition to taking into consideration the opportunities, potentials and limitations of the resources, the level of interconnection with the central government within the district and between sub-districts and rural areas.

  9. Metrication report to the Congress

    NASA Technical Reports Server (NTRS)

    1991-01-01

    NASA's principal metrication accomplishments for FY 1990 were establishment of metrication policy for major programs, development of an implementing instruction for overall metric policy and initiation of metrication planning for the major program offices. In FY 1991, development of an overall NASA plan and individual program office plans will be completed, requirement assessments will be performed for all support areas, and detailed assessment and transition planning will be undertaken at the institutional level. Metric feasibility decisions on a number of major programs are expected over the next 18 months.

  10. Formulating New Directions with Strategic Marketing Planning.

    ERIC Educational Resources Information Center

    Crompton, John L.

    1983-01-01

    This article describes both a short- and long-term strategic marketing planning approach for the parks and recreation manager. Both plans involve a needs assessment, objective development, marketing plans, and evaluations. Also discussed is a continuum of stragetic program options ranging from developing new programs to terminating existing…

  11. Characterizing the Breadth and Depth of Volunteer Water Monitoring Programs in the United States.

    PubMed

    Stepenuck, Kristine F; Genskow, Kenneth D

    2018-01-01

    A survey of 345 volunteer water monitoring programs in the United States was conducted to document their characteristics, and perceived level of support for data to inform natural resource management or policy decisions. The response rate of 86% provided information from 46 states. Programs represented a range of ages, budgets, objectives, scopes, and level of quality assurance, which influenced data uses and perceived support by sponsoring agency administrators and external decision makers. Most programs focused on rivers, streams, and lakes. Programs had not made substantial progress to develop EPA or state-approved quality assurance plans since 1998, with only 48% reporting such plans. Program coordinators reported feeling slightly more support for data to be used for management as compared to policy decisions. Programs with smaller budgets may be at particular risk of being perceived to lack credibility due to failure to develop quality assurance plans. Over half of programs identified as collaborative, in that volunteers assisted scientists in program design, data analysis and/or dissemination of results. Just under a third were contributory, in which volunteers primarily collected data in a scientist-defined program. Recommendations to improve perceived data credibility, and to augment limited budgets include developing quality assurance plans and gaining agency approval, and developing partnerships with other organizations conducting monitoring in the area to share resources and knowledge. Funding agencies should support development of quality assurance plans to help ensure data credibility. Service providers can aid in plan development by providing training to program staff over time to address high staff turnover rates.

  12. Characterizing the Breadth and Depth of Volunteer Water Monitoring Programs in the United States

    NASA Astrophysics Data System (ADS)

    Stepenuck, Kristine F.; Genskow, Kenneth D.

    2018-01-01

    A survey of 345 volunteer water monitoring programs in the United States was conducted to document their characteristics, and perceived level of support for data to inform natural resource management or policy decisions. The response rate of 86% provided information from 46 states. Programs represented a range of ages, budgets, objectives, scopes, and level of quality assurance, which influenced data uses and perceived support by sponsoring agency administrators and external decision makers. Most programs focused on rivers, streams, and lakes. Programs had not made substantial progress to develop EPA or state-approved quality assurance plans since 1998, with only 48% reporting such plans. Program coordinators reported feeling slightly more support for data to be used for management as compared to policy decisions. Programs with smaller budgets may be at particular risk of being perceived to lack credibility due to failure to develop quality assurance plans. Over half of programs identified as collaborative, in that volunteers assisted scientists in program design, data analysis and/or dissemination of results. Just under a third were contributory, in which volunteers primarily collected data in a scientist-defined program. Recommendations to improve perceived data credibility, and to augment limited budgets include developing quality assurance plans and gaining agency approval, and developing partnerships with other organizations conducting monitoring in the area to share resources and knowledge. Funding agencies should support development of quality assurance plans to help ensure data credibility. Service providers can aid in plan development by providing training to program staff over time to address high staff turnover rates.

  13. 7 CFR 1207.311 - Programs and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.311 Programs and projects. Programs and projects mean those research, development, advertising or promotion programs or projects developed by the...

  14. The Galaxy Plan in Industrial Education. [Materials] Developed in The Experienced Teacher Fellowship Program.

    ERIC Educational Resources Information Center

    McClea, Kenneth R., Ed.; And Others

    These materials inform school administrators of the rationale of the Detroit Galaxy Plan and provide procedures for implementing the Plan. This program of occupational education for secondary Grades 7 through 12 is planned for students who intend to enter college, apprenticeships, or employment after high school. The Plan, developed by 24…

  15. Customizing for clients: developing a library liaison program from need to plan.

    PubMed

    Tennant, M R; Butson, L C; Rezeau, M E; Tucker, P J; Boyle, M E; Clayton, G

    2001-01-01

    Building on the experiences of librarian representatives to curriculum committees in the colleges of dentistry, medicine, and nursing, the Health Science Center Libraries (HSCL) Strategic Plan recommended the formation of a Library Liaison Work Group to create a formal Library Liaison Program to serve the six Health Science Center (HSC) colleges and several affiliated centers and institutes. The work group's charge was to define the purpose and scope of the program, identify models of best practice, and recommend activities for liaisons. The work group gathered background information, performed an environmental scan, and developed a philosophy statement, a program of liaison activities focusing on seven primary areas, and a forum for liaison communication. Hallmarks of the plan included intensive subject specialization (beyond collection development), extensive communication with users, and personal information services. Specialization was expected to promote competence, communication, confidence, comfort, and customization. Development of the program required close coordination with other strategic plan implementation teams, including teams for collection development, education, and marketing. This paper discusses the HSCL's planning process and the resulting Library Liaison Program. Although focusing on an academic health center, the planning process and liaison model may be applied to any library serving diverse, subject-specific user populations.

  16. Customizing for clients: developing a library liaison program from need to plan*

    PubMed Central

    Tennant, Michele R.; Butson, Linda C.; Rezeau, Michelle E.; Tucker, Prudence J.; Boyle, Marian E.; Clayton, Greg

    2001-01-01

    Building on the experiences of librarian representatives to curriculum committees in the colleges of dentistry, medicine, and nursing, the Health Science Center Libraries (HSCL) Strategic Plan recommended the formation of a Library Liaison Work Group to create a formal Library Liaison Program to serve the six Health Science Center (HSC) colleges and several affiliated centers and institutes. The work group's charge was to define the purpose and scope of the program, identify models of best practice, and recommend activities for liaisons. The work group gathered background information, performed an environmental scan, and developed a philosophy statement, a program of liaison activities focusing on seven |primary areas, and a forum for liaison communication. Hallmarks of the plan included intensive subject specialization (beyond collection development), extensive communication with users, and personal information services. Specialization was expected to promote competence, communication, confidence, comfort, and customization. Development of the program required close coordination with other strategic plan implementation teams, including teams for collection development, education, and marketing. This paper discusses the HSCL's planning process and the resulting Library Liaison Program. Although focusing on an academic health center, the planning process and liaison model may be applied to any library serving diverse, subject-specific user populations. PMID:11209807

  17. 45 CFR 98.14 - Plan process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Department of Health and Human Services GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...

  18. 45 CFR 98.14 - Plan process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...

  19. 45 CFR 98.14 - Plan process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...

  20. 45 CFR 98.14 - Plan process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...

  1. 45 CFR 98.14 - Plan process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...

  2. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  3. Social Policy Planning Programs and Prospects.

    ERIC Educational Resources Information Center

    Todd, Frederick W.

    This study, a monitor of four experimental training programs in the field of social policy planning, has as its purpose to assess program development and outcomes and to relate any significant findings useful in educational program development for social policy professionals. The programs are discussed at two levels: individually in terms of their…

  4. Manual for Preparing Individualized Education Programs.

    ERIC Educational Resources Information Center

    Baylor, Terrill D.

    Presented are guidelines for developing an individualized program and services plan, an individual implementation plan, and daily activity and strategy plans for handicapped students. Instructions are outlined for utilizing forms related to planning and implementation of individualized education programs. Appended are sample forms. (SBH)

  5. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER WM) operations at DOE sites to be safer,more » faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs.« less

  6. Third World Experience of Education for Planning: Africa.

    ERIC Educational Resources Information Center

    Tetteh, Austin

    1980-01-01

    Presented is an overview of the development of planning education at the undergraduate, graduate, and professional levels in Africa. Future needs include greater program flexibility and more help for developing countries to establish their own planning education programs. (WB)

  7. 34 CFR 606.10 - What activities may and may not be carried out under a grant?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., and student service programs designed to improve academic success. (6) Funds management... development courses. (6) Developing or improving community-based or community services programs, unless the...) Planning grants. Under a planning grant, a grantee shall formulate— (1) A comprehensive development plan...

  8. 34 CFR 606.10 - What activities may and may not be carried out under a grant?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., and student service programs designed to improve academic success. (6) Funds management... development courses. (6) Developing or improving community-based or community services programs, unless the...) Planning grants. Under a planning grant, a grantee shall formulate— (1) A comprehensive development plan...

  9. 34 CFR 606.10 - What activities may and may not be carried out under a grant?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., and student service programs designed to improve academic success. (6) Funds management... development courses. (6) Developing or improving community-based or community services programs, unless the...) Planning grants. Under a planning grant, a grantee shall formulate— (1) A comprehensive development plan...

  10. The Charlotte-Mecklenburg Teacher Career Development Program.

    ERIC Educational Resources Information Center

    Schlechty, Phillip C.; And Others

    1985-01-01

    Effective training, evaluation, and incentives are key aspects of this school system's six-level career ladder program for teacher development. The three-pronged committee structure for planning and communication and the program's ownership by everyone involved have been vital to its successful planning and development. (DCS)

  11. American Historical Association Faculty Development Program: Planning and Implementation.

    ERIC Educational Resources Information Center

    Hoffmann, Charles

    The planning and implementation processes of the Long Island Faculty Development Program are described. Originally sponsored by the American Historical Association's Faculty Development Program to improve history instruction, this project includes faculty representatives from four Long Island universities, colleges, and junior colleges. The…

  12. An Education and Development Program for Michigan's State Health Planning Advisory Council.

    ERIC Educational Resources Information Center

    Michigan State Office of Health and Medical Affairs, Lansing.

    The report describes a Federally supported education and development program conducted during the 1973-74 fiscal year for members of the Michigan State Health Planning Advisory Council. The program sought to increase: (1) the council members' awareness of and insight into the comprehensive health planning process, (2) their knowledge of the health…

  13. Integrated environmental planning in the Philippines: A case study of the Palawan Integrated Environmental Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ganapin, D.J. Jr.

    1987-01-01

    Integrated environmental planning was analyzed using the case of the Palawan Integrated Environmental Program in the Philippines. The study explores the relationship between development and environmental planning and evaluates the importance of organizational coordination and timing in the integration of these two concerns. Factors affecting the accomplishment of the objectives of integrated environmental planning were also studied. Two planning phases of the Palawan Integrated Environmental Program were observed using the case study approach. Observations of various planning participants-consultants, middle level agency personnel, heads of local agencies-were also considered. The integration of environmental considerations in development planning was found to bemore » beneficial to both environmental and development concerns. The experience showed that such integration requiring tight organizational coordination and the proper timing of activities and outputs. The success of the Palawan Integrated Environmental Program was also found to depend on effective communication, the political functionality of the government, the leadership of its executives, the presence of appropriate structures of authority, sufficiency of funds and manpower and the availability of appropriate environmental planning techniques. Recommendations are provided to further strengthen the integration of environmental considerations in development planning and increase the effectiveness of integrated environmental programs.« less

  14. The Missouri Career Development and Teacher Excellence Plan: An Initial Study of Missouri's Career Ladder Program. A Technical Report.

    ERIC Educational Resources Information Center

    Schofer, Richard C.; And Others

    The Missouri Plan provides for direct participation of teachers in the planning, development, and implementation of the district career ladder plan. This study analyzed the appropriateness of the Missouri teacher incentive plan. In particular, the study sought to determine why districts did or did not choose to implement career ladder programs;…

  15. Establishing a program of global initiatives for nursing education.

    PubMed

    Kulage, Kristine M; Hickey, Kathleen T; Honig, Judy C; Johnson, Mary P; Larson, Elaine L

    2014-07-01

    In the global nursing community, schools of nursing are increasingly developing initiatives and networks across national boundaries. This article describes the process undertaken at a school of nursing to determine its global health priorities and develop a program of global initiatives for nursing education. A series of meetings were held to determine faculty global activities and gauge interest in designing a 5-year strategic plan for the program. A volunteer Strategic Planning Work-group was convened to formalize a mission, vision, and strategic plan for the program, which were presented to, refined by, and vetted by an advisory board and the faculty at large. We recommend this process to schools committed to developing or expanding a program dedicated to global initiatives and a global perspective in educational planning. Involving stakeholders, building on current strengths, and aligning with mission and vision are essential elements for developing a meaningful program of global initiatives for nursing education. Copyright 2014, SLACK Incorporated.

  16. Creating a Marketing Plan.

    ERIC Educational Resources Information Center

    Sevier, Robert A.

    1989-01-01

    A guide to developing a college marketing plan defines key marketing terms, outlines the development of a plan (including institutional analysis, market research, strategy formation and execution, and program evaluation), and provides a list of important principles with which to operate a program. (MSE)

  17. Outcomes of a career planning and development program for registered nurses.

    PubMed

    Hall, Linda McGillis; Waddell, Janice; Donner, Gail; Wheeler, Mary M

    2004-01-01

    The impact of a career planning and development program (CPDP) for registered nurses (RNs) on nurse and system outcomes was examined. The CPDP was effective as participants were able to create a career vision and individualized career plan.

  18. 23 CFR 420.201 - What is the purpose of this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ....201 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING AND RESEARCH PROGRAM ADMINISTRATION Research, Development and Technology Transfer Program... requirements for research, development, and technology transfer (RD&T) activities, programs, and studies...

  19. 7 CFR 1210.311 - Programs and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PROMOTION PLAN Watermelon Research and Promotion Plan Definitions § 1210.311 Programs and projects. Programs and projects mean those research, development, advertising, or promotion programs or projects...

  20. National Program Plan for Research and Development in Solar Heating and Cooling. Interim Report.

    ERIC Educational Resources Information Center

    Energy Research and Development Administration, Washington, DC. Div. of Solar Energy.

    This report presents the Energy Research and Development Administration (ERDA) program plan for solar heating and cooling of buildings and for agricultural and industrial process applications. An overview of the program plan is followed by a description of the ten paths to the solar heating and cooling of buildings and a brief discussion of the…

  1. How Strategic Planning Keeps You Sane when Delivering Distance Programs

    ERIC Educational Resources Information Center

    MacNeil, Dixie; Luzius, Kim; Dunkin, Sonya

    2010-01-01

    This paper details the advantages of creating a strategic plan in the development and delivery of distance programs at the authors' own institution. The steps involved in the planning process and the three key elements of a successful strategic plan are addressed. The key elements include a program plan explaining the roles/responsibilities of…

  2. The Integration of English Language Development and Science Instruction in Elementary Classrooms

    NASA Astrophysics Data System (ADS)

    Zwiep, Susan Gomez; Straits, William J.; Stone, Kristin R.; Beltran, Dolores D.; Furtado, Leena

    2011-12-01

    This paper explores one district's attempt to implement a blended science and English Language Development (ELD) elementary program, designed to provide English language learners opportunities to develop proficiency in English through participation in inquiry-based science. This process resulted in blended program that utilized a combined science/ELD lesson plan format to structure and guide teachers' efforts to use science as the context for language development. Data, collected throughout the first 2 years of the program, include teacher-generated lesson plans, observation notes, and interviews with teachers and principals. The process by which the blended program was developed, the initial implementation of the program, the resulting science/ELD lesson plan format, and teachers' perceptions about the program and its impact on their students are described.

  3. Intervention mapping: a process for developing theory- and evidence-based health education programs.

    PubMed

    Bartholomew, L K; Parcel, G S; Kok, G

    1998-10-01

    The practice of health education involves three major program-planning activities: needs assessment, program development, and evaluation. Over the past 20 years, significant enhancements have been made to the conceptual base and practice of health education. Models that outline explicit procedures and detailed conceptualization of community assessment and evaluation have been developed. Other advancements include the application of theory to health education and promotion program development and implementation. However, there remains a need for more explicit specification of the processes by which one uses theory and empirical findings to develop interventions. This article presents the origins, purpose, and description of Intervention Mapping, a framework for health education intervention development. Intervention Mapping is composed of five steps: (1) creating a matrix of proximal program objectives, (2) selecting theory-based intervention methods and practical strategies, (3) designing and organizing a program, (4) specifying adoption and implementation plans, and (5) generating program evaluation plans.

  4. Influence of PPB on Capital Budgeting.

    ERIC Educational Resources Information Center

    Ellis, Arthur E.

    This talk is divided into two parts: Part one covers Planning, Programming and Budgeting for Capital Programs. Part two is a brief description of the Coho Salmon Program and how Program Planning and Budgeting in both the operation program and the capital phase was used to develop the Salmon Fishing Industry in Michigan. The planning process…

  5. Space Station Freedom operations planning

    NASA Technical Reports Server (NTRS)

    Accola, Anne L.; Keith, Bryant

    1989-01-01

    The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.

  6. Career Exploration Occupational Information for the Junior High/Middle School. A Planning Curriculum Guide.

    ERIC Educational Resources Information Center

    Lawson, Dorothy M.; McDonald, Dorothea V.

    Materials contained in this guide are designed to be used in planning a comprehensive career education program and for developing individual career education units for grades 6-9. Section 1 is the planning guide and contains strategies for organizing, planning, and implementing a program, developing staff inservice, conducting a needs assessment,…

  7. A Planning Model for the Development of Programs for Abused and Neglected Children in Rural Areas.

    ERIC Educational Resources Information Center

    Chamberlain, William A.

    Described are planning steps involved in developing programs for abused and neglected children in rural areas. Among barriers cited are economic factors and resistance to social planning. Emphasized is the need for congruence among local and regional agencies and organizations. Analyzed are six planning stages: entry, in which consultants gain…

  8. F-35 Joint Strike Fighter: Continued Oversight Needed as Program Plans to Begin Development of New Capabilities

    DTIC Science & Technology

    2016-04-01

    3Concurrency is broadly defined as the overlap between technology development and product development or between product development and...reported extensively on the F-35 program’s cost, schedule, and performance problems. The program plans to begin increasing production rates over the...internal DOD program analyses. GAO also collected and analyzed production and supply chain performance data, and interviewed DOD, program, and

  9. SDDOT transportation systems management & operations program plan.

    DOT National Transportation Integrated Search

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  10. Administrative and Technical Support for the U.S. Army Medical Research and Development Command Joint Working Group on Medical Chemical Defense

    DTIC Science & Technology

    1989-08-01

    microproces;qor databaAing systems for monitoring project and contract reports and program technology trans. fers, coordinating and providing administratIvo ...The JWGD 3 annual planning process generally included: - Program review by the JWGD’ membership at quarterly meetings, which consisted of the review...Office developed the program planning and budget documents associated with the planning process outlined above. Program project databases and

  11. Integrating the Department of Defense Military Services’ Technology Development Programs to Improve Time, Cost, and Technical Quality Parameters

    DTIC Science & Technology

    2007-03-01

    the DoD in general and across the SR, DD(X), and FCS programs in particular. The findings of this study show that through careful planning and...FCS programs in particular. The findings of this study show that through careful planning and coordinated technology transition, DoD acquisition...careful planning and coordinated technology transition, DoD acquisition programs can indeed leverage the technology development efforts of the three

  12. Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizesmore » current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.« less

  13. A PLAN FOR EXPANSION AND DEVELOPMENT OF EDUCATION DEPARTMENTS OF FLORIDA DIVISION OF CORRECTIONS, IN COOPERATION WITH FLORIDA STATE UNIVERSITY ADULT EDUCATION DEPARTMENT.

    ERIC Educational Resources Information Center

    ENDWRIGHT, D.K.

    THE PLAN FOR EXPANSION AND DEVELOPMENT OF EDUCATION PROGRAMS IN CORRECTIVE INSTITUTIONS IS ORGANIZED INTO FIVE TIMED PHASES TO BE COMPLETED IN THREE YEARS. A CHART REPRESENTING THE PROGRAM, AFFILIATED RESEARCH AND AGENCIES DELINEATES PLANNED ACTIVITIES. PHASE ONE (15 WEEKS) WILL SURVEY EXISTING PROGRAMS (VOCATIONAL AND ACADEMIC FACILITIES,…

  14. Development and Evaluation of Educational Programs in Electromechanical Technology. Final Report.

    ERIC Educational Resources Information Center

    Roney, M. W.

    The encompassing objective of this project was to assist two-year colleges in establishing electromechanical technican (EMT) training programs by developing the necessary planning and instructional materials and by providing direct program planning assistance. The research effort of the project was to develop and test an integrated systems of…

  15. Developing Your Evaluation Plans: A Critical Component of Public Health Program Infrastructure.

    PubMed

    Lavinghouze, S Rene; Snyder, Kimberly

    A program's infrastructure is often cited as critical to public health success. The Component Model of Infrastructure (CMI) identifies evaluation as essential under the core component of engaged data. An evaluation plan is a written document that describes how to monitor and evaluate a program, as well as how to use evaluation results for program improvement and decision making. The evaluation plan clarifies how to describe what the program did, how it worked, and why outcomes matter. We use the Centers for Disease Control and Prevention's (CDC) "Framework for Program Evaluation in Public Health" as a guide for developing an evaluation plan. Just as using a roadmap facilitates progress on a long journey, a well-written evaluation plan can clarify the direction your evaluation takes and facilitate achievement of the evaluation's objectives.

  16. 7 CFR 1948.82 - Plan and State Investment Strategy approval procedure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) RURAL DEVELOPMENT Section 601 Energy Impacted Area Development Assistance Program § 1948.82 Plan and State Investment Strategy approval... the plan; (3) A brief description of the socio-economic impacts that have occurred during the two most...

  17. Scheduling language and algorithm development study. Volume 2, phase 2: Introduction to plans programming. [user guide

    NASA Technical Reports Server (NTRS)

    Cochran, D. R.; Ishikawa, M. K.; Paulson, R. E.; Ramsey, H. R.

    1975-01-01

    A user guide for the Programming Language for Allocation and Network Scheduling (PLANS) is presented. Information is included for the construction of PLANS programs. The basic philosophy of PLANS is discussed, and access and update reference techniques are described along with the use of tree structures.

  18. Planning guidance for the Chemical Stockpile Emergency Preparedness Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shumpert, B.L.; Watson, A.P.; Sorensen, J.H.

    1995-02-01

    This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists tomore » assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.« less

  19. Logistics planning for phased programs.

    NASA Technical Reports Server (NTRS)

    Cook, W. H.

    1973-01-01

    It is pointed out that the proper and early integration of logistics planning into the phased program planning process will drastically reduce these logistics costs. Phased project planning is a phased approach to the planning, approval, and conduct of major research and development activity. A progressive build-up of knowledge of all aspects of the program is provided. Elements of logistics are discussed together with aspects of integrated logistics support, logistics program planning, and logistics activities for phased programs. Continuing logistics support can only be assured if there is a comprehensive sequential listing of all logistics activities tied to the program schedule and a real-time inventory of assets.

  20. Study on utilization of advanced composites in commercial aircraft wing structures, volume 2

    NASA Technical Reports Server (NTRS)

    Sakata, I. F.; Ostrom, R. B.

    1978-01-01

    A plan is defined for a composite wing development effort which will assist commercial transport manufacturers in reaching a level of technology readiness where the utilization of composite wing structure is a cost competitive option for a new aircraft production plan. The recommended development effort consists of two programs: a joint government/industry material development program and a wing structure development program. Both programs are described in detail.

  1. Manned Orbital Transfer Vehicle (MOTV). Volume 6: Five year program plan

    NASA Technical Reports Server (NTRS)

    Boyland, R. E.; Sherman, S. W.; Morfin, H. W.

    1979-01-01

    The five year program plan for the manned orbit transfer vehicle (MOTV) is presented. The planning, schedules, cost estimates, and supporting data (objectives, constraints, assumptions, etc.) associated with the development of the MOTV are discussed. The plan, in addition to the above material, identifies the supporting research and technology required to resolve issues critical to MOTV development.

  2. Strategic Plan. Volume 2

    NASA Technical Reports Server (NTRS)

    2002-01-01

    The Mission of the NSBRI will be to lead a National effort for accomplishing the integrated, critical path, biomedical research necessary to support the long term human presence, development, and exploration of space and to enhance life on Earth by applying the resultant advances in human knowledge and technology acquired through living and working in space. To carry out this mission, the NSBRI focuses its activities on three Strategic Programs: Strategic Program 1: Countermeasure Research Strategic Program 2: Education, Training and Outreach Strategic Program 3: Cooperative Research and Development. This document contains the detailed Team Strategic Plans for the 11 research teams focused on Strategic Program 1, and the Education and Outreach Team focused on Strategic Program 2. There is overlap and integration among the Programs and Team Strategic Plans, as described in each of the Plans.

  3. TRU Waste Management Program. Cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  4. Planning, Conducting, and Documenting Data Analysis for Program Improvement

    ERIC Educational Resources Information Center

    Winer, Abby; Taylor, Cornelia; Derrington, Taletha; Lucas, Anne

    2015-01-01

    This 2015 document was developed to help technical assistance (TA) providers and state staff define and limit the scope of data analysis for program improvement efforts, including the State Systemic Improvement Plan (SSIP); develop a plan for data analysis; document alternative hypotheses and additional analyses as they are generated; and…

  5. Ready to sell our program. Anybody who is interested in learning Indonesian experience is invited to take part in the BKKBN's international training program.

    PubMed

    Suyono, H

    1996-01-01

    The Indonesian Family Planning Program was officially launched in 1970 when President Suharto developed the National Family Planning Coordinating Board (BKKBN) to administrate the national family planning program. The inauguration of the family planning program came at the heels of a special demand by the people with very strong support of the ulama. The program was subsequently developed and expanded into remote areas in 1976. In 1992, a family-based approach to family planning was implemented in which every village family was made responsible for family planning. The program is based upon a very strong political commitment at the highest level as well as at the provincial, district, subdistrict, and village levels; it continuously innovates; every community can name its family planning program as it likes; and there is constant feedback to the community. Indonesia's family planning program strategies are as follows: it is suggested that couples in which the wife is aged 20-30 years have only two children; it is recommended that women over age 30 have no more children due to the comparatively high risks of pregnancy at that age; considerable effort is given to encourage youths to not become pregnant and bear children; numerous chairmen of small community family planning groups are appointed; and social and cultural conditions have been created in which people work for family planning activities. People interested in learning from the Indonesian experience in family planning may participate in the BKKBN's international training program.

  6. AN ACADEMIC DEVELOPMENT PLAN FOR THE UNIVERSITY OF HAWAII, JANUARY 1964 AND 2 SUPPLEMENTS--1966, 1967.

    ERIC Educational Resources Information Center

    HIATT, ROBERT W.

    A SURVEY OF POLICIES AND PROGRAMS AT THE UNIVERSITY OF HAWAII'S MANOA AND HILO CAMPUS IS USED AS THE BASIS OF A DEVELOPMENT PLAN. THE SURVEY DISCUSSES PROGRAMS AND FACILITY NEEDS IN RELATION TO THE OBJECTIVES OF INSTRUCTION, RESEARCH AND PUBLIC SERVICE. IMPLEMENTATION OF THE DEVELOPMENT PLAN INCLUDES DISCUSSION OF OPERATING BUDGET, CURRENT…

  7. The Role of Public-Sector Family Planning Programs in Meeting the Demand for Contraception in Sub-Saharan Africa.

    PubMed

    Bongaarts, John; Hardee, Karen

    2017-06-01

    Commonly used indicators of contraceptive behavior in a population-modern contraceptive prevalence (mCPR), unmet need for contraception, demand for contraception and demand satisfied-are not well-suited for evaluating the progress made by government family planning programs in helping women and men achieve their reproductive goals. Trends in these measures in 26 Sub-Saharan African countries between 1990 and 2014 were examined. Trends in a proposed new indicator, the public-sector family planning program impact score (PFPI), and its relationship to mCPR and the family planning effort score were also assessed. Case studies were used to review public family planning program development and implementation in four countries (Nigeria, Ethiopia, Rwanda and Kenya). The four commonly used indicators capture the extent to which women use family planning and to which demand is satisfied, but shed no direct light on the role of family planning programs. PFPI provides evidence that can be used to hold governments accountable for meeting the demand for family planning, and was closely related to policy developments in the four case-study countries. PFPI provides a useful addition to the indicators currently used to assess progress in reproductive health and family planning programs.

  8. Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan

    NASA Technical Reports Server (NTRS)

    Zeidler, Janet

    1999-01-01

    Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.

  9. 25 CFR 20.202 - What is a tribal redesign plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SOCIAL SERVICES PROGRAMS Welfare Reform § 20.202 What is a tribal redesign plan? If you are a tribe administering a general assistance program, you can develop and submit to us a tribal redesign plan to change the way that you administer the program. (a) A tribal redesign plan allows a tribe to: (1) Change...

  10. 20 CFR 632.17 - Planning process.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Planning process. 632.17 Section 632.17... EMPLOYMENT AND TRAINING PROGRAMS Program Planning, Application and Modification Procedures § 632.17 Planning process. (a) Each Native American grantee shall establish a planning process for the development of its...

  11. Design of a continuous quality improvement program to prevent falls among community-dwelling older adults in an integrated healthcare system.

    PubMed

    Ganz, David A; Yano, Elizabeth M; Saliba, Debra; Shekelle, Paul G

    2009-11-16

    Implementing quality improvement programs that require behavior change on the part of health care professionals and patients has proven difficult in routine care. Significant randomized trial evidence supports creating fall prevention programs for community-dwelling older adults, but adoption in routine care has been limited. Nationally-collected data indicated that our local facility could improve its performance on fall prevention in community-dwelling older people. We sought to develop a sustainable local fall prevention program, using theory to guide program development. We planned program development to include important stakeholders within our organization. The theory-derived plan consisted of 1) an initial leadership meeting to agree on whether creating a fall prevention program was a priority for the organization, 2) focus groups with patients and health care professionals to develop ideas for the program, 3) monthly workgroup meetings with representatives from key departments to develop a blueprint for the program, 4) a second leadership meeting to confirm that the blueprint developed by the workgroup was satisfactory, and also to solicit feedback on ideas for program refinement. The leadership and workgroup meetings occurred as planned and led to the development of a functional program. The focus groups did not occur as planned, mainly due to the complexity of obtaining research approval for focus groups. The fall prevention program uses an existing telephonic nurse advice line to 1) place outgoing calls to patients at high fall risk, 2) assess these patients' risk factors for falls, and 3) triage these patients to the appropriate services. The workgroup continues to meet monthly to monitor the progress of the program and improve it. A theory-driven program development process has resulted in the successful initial implementation of a fall prevention program.

  12. Professional Development Policies and Programs.

    ERIC Educational Resources Information Center

    Department of the Interior, Washington, DC.

    This memorandum sets forth policies, objectives, plans and programs for providing opportunities to professional staff for development of their technical and managerial skills. Section titles are: Policy and Objectives; Methods of Achieving Objectives; Cooperative Determination of Training Needs, Professional Development Plan; Agency Financial…

  13. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 1 2012-01-01 2012-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  14. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 1 2014-01-01 2014-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  15. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 1 2013-01-01 2013-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  16. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  17. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  18. 24 CFR 3286.813 - Inclusion in state plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Inclusion in state plan. 3286.813 Section 3286.813 Housing and Urban Development Regulations Relating to Housing and Urban Development... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM State Programs § 3286.813 Inclusion in state...

  19. 24 CFR 3286.813 - Inclusion in state plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Inclusion in state plan. 3286.813 Section 3286.813 Housing and Urban Development Regulations Relating to Housing and Urban Development... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM State Programs § 3286.813 Inclusion in state...

  20. 24 CFR 3286.813 - Inclusion in state plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Inclusion in state plan. 3286.813 Section 3286.813 Housing and Urban Development Regulations Relating to Housing and Urban Development... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM State Programs § 3286.813 Inclusion in state...

  1. 7 CFR 23.4 - State Rural Development Advisory Council.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 23.4 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State... Development Advisory Council will insure that programs proposed under title V including regional programs... research and extension plan which would impact directly on rural development activities being developed or...

  2. 7 CFR 23.4 - State Rural Development Advisory Council.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 23.4 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State... Development Advisory Council will insure that programs proposed under title V including regional programs... research and extension plan which would impact directly on rural development activities being developed or...

  3. 7 CFR 23.4 - State Rural Development Advisory Council.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 23.4 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State... Development Advisory Council will insure that programs proposed under title V including regional programs... research and extension plan which would impact directly on rural development activities being developed or...

  4. 7 CFR 23.4 - State Rural Development Advisory Council.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 23.4 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State... Development Advisory Council will insure that programs proposed under title V including regional programs... research and extension plan which would impact directly on rural development activities being developed or...

  5. 24 CFR 3286.813 - Inclusion in state plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Inclusion in state plan. 3286.813 Section 3286.813 Housing and Urban Development Regulations Relating to Housing and Urban Development... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM State Programs § 3286.813 Inclusion in state...

  6. 24 CFR 3286.813 - Inclusion in state plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Inclusion in state plan. 3286.813 Section 3286.813 Housing and Urban Development Regulations Relating to Housing and Urban Development... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM State Programs § 3286.813 Inclusion in state...

  7. 24 CFR 570.410 - Special Projects Program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND... sent to: Department of Housing and Urban Development, Office of Community Planning and Development, 451... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Special Projects Program. 570.410...

  8. Strategic plan for bioenergy research, 1998--2003, the Canadian Forest Service five-year plan: Implementing the Canadian bioenergy research strategy (in English;French)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-10-01

    This document supersedes the previous one, taking into account changes that have taken place in the CFS Science and Technology (S and T) program structure and organization, and in the structure of the Program of Energy Research and Development, the source of funding for CFS bioenergy research. It explains the rationale and overall objective for the bioenergy research program and briefly reviews the accomplishments to date. It indicates the planning context within which the program operates, states the specific objectives for the period of the plan, and details the strategic priorities developed for this period. Finally, it outlines the implementationmore » process for the plan.« less

  9. Planning and Measurement in School to Work Transition.

    ERIC Educational Resources Information Center

    Kooi, Beverly Y.

    An analysis, development, and research (ADR) approach for planning educational research and development programs was used as a model for planning the National Institute of Education's School-To-Work Transition Program. The ADR model is system oriented and utilizes an iterative approach in which research questions are raised as others are answered.…

  10. Training and Learning as Drivers of US Microenterprise Business Plan Quality

    ERIC Educational Resources Information Center

    Cook, Ronald G.; Belliveau, Paul; Sandberg, Mark E.

    2004-01-01

    This study examined the output quality of a US microenterprise training program created to help entrepreneurs develop business plans for their ventures. The program concludes with the entrepreneurs' plans being scored by a panel of experts. Hypotheses were developed and tested to determine the importance of feedback, key components of business…

  11. Improving Human Services: Methods for Systematic Planning, Evaluation, and Staff Development.

    ERIC Educational Resources Information Center

    Jones, G. Brian; And Others

    This monograph speaks to the basic problems confronting human services programs, and offers suggestions for improving guidance services. Specific concerns addressed are: (1) the need for more systematic program planning and evaluation; (2) an approach to effective planning and evaluation; (3) development of staff skills for use in the…

  12. 42 CFR 56.503 - Project elements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SERVICES Grants for Planning and Developing Migrant Health Programs § 56.503 Project elements. A project for the planning and development of a migrant health program supported under this subpart must: (a... an assessment of need of the population proposed to be served by the migrant health program for the...

  13. Reciprocal Peer Coaching: A Critical Contributor to Implementing Individual Leadership Plans

    ERIC Educational Resources Information Center

    Goldman, Ellen; Wesner, Marilyn; Karnchanomai, Ornpawee

    2013-01-01

    Billions of dollars are spent annually on programs to develop organizational leaders, yet the effectiveness of these programs is poorly understood. Scholars advise that value is enhanced by the development of individual leadership plans at program completion, followed by implementation experience with subsequent coaching and reflection. The…

  14. A new DoD initiative: the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program

    NASA Astrophysics Data System (ADS)

    Arevalo, S.; Atwood, C.; Bell, P.; Blacker, T. D.; Dey, S.; Fisher, D.; Fisher, D. A.; Genalis, P.; Gorski, J.; Harris, A.; Hill, K.; Hurwitz, M.; Kendall, R. P.; Meakin, R. L.; Morton, S.; Moyer, E. T.; Post, D. E.; Strawn, R.; Veldhuizen, D. v.; Votta, L. G.; Wynn, S.; Zelinski, G.

    2008-07-01

    In FY2008, the U.S. Department of Defense (DoD) initiated the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program, a 360M program with a two-year planning phase and a ten-year execution phase. CREATE will develop and deploy three computational engineering tool sets for DoD acquisition programs to use to design aircraft, ships and radio-frequency antennas. The planning and execution of CREATE are based on the 'lessons learned' from case studies of large-scale computational science and engineering projects. The case studies stress the importance of a stable, close-knit development team; a focus on customer needs and requirements; verification and validation; flexible and agile planning, management, and development processes; risk management; realistic schedules and resource levels; balanced short- and long-term goals and deliverables; and stable, long-term support by the program sponsor. Since it began in FY2008, the CREATE program has built a team and project structure, developed requirements and begun validating them, identified candidate products, established initial connections with the acquisition programs, begun detailed project planning and development, and generated the initial collaboration infrastructure necessary for success by its multi-institutional, multidisciplinary teams.

  15. National Civil Applications Program: strategic plan vision for 2005

    USGS Publications Warehouse

    ,

    2004-01-01

    The National Mapping Division (NMD) has developed this comprehensive strategic plan to chart the course of the National Civil Applications Program (NCAP) over the next 5 years. To meet the challenges of the future, the NCAP is changing its program emphases, methods of responding to customer needs, and business practices. The NCAP Strategic Plan identifies the new direction for the program through a series of strategic thrusts and goals for managers to use in formulating plans, establishing program emphases, and determining resource needs and allocations.

  16. Homemaker-Home Health Aide Program. A Challenge to Vocational Education. A Modified Competency Based Pilot Training Program.

    ERIC Educational Resources Information Center

    Holton, Hazel S.

    This curriculum guide is designed to be used by vocational educators in planning, developing, coordinating, and implementing homemaker-health aide programs. It is divided into three parts. Covered first are various aspects of program planning, including planning and organization, the role of the adult educator and the adult learner, and…

  17. Strategies for Action: An Outline of Factors Which Influence Decisions on Program Plans.

    ERIC Educational Resources Information Center

    Bogue, E. G.

    This paper discusses strategies which can help the admissions officer/registrar be more effective in having his program plans transformed into reality. The program planning process is considered from three prospectives beginning with a brief discussion of the current state of program development in higher education. It is conjectured that the…

  18. An Aid for Planning Programs in Career Education.

    ERIC Educational Resources Information Center

    Illinois State Board of Vocational Education and Rehabilitation, Springfield. Div. of Vocational and Technical Education.

    Offered as an aid for developing sequential occupational education programs, the publication presents a concept in career education planning beginning with kindergarten and continuing through adult years. Career education goals are defined, and steps in planning sequential programs are outlined as follows: (1) organization of the occupational…

  19. The 25 kW power module evolution study. Part 3: Conceptual designs for power module evolution. Volume 2: Program plans

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A plan is presented for the evolutionary development and deployment of the power module system with performance capabilities required to support the 1983 to 1990 user requirements. Aspects summarized include program functional, operational, and hardware elements; program work breakdown and specification items; development plans and schedules for developmental and technology milestones; test concepts and timeliness; and ground and orbit operations concepts.

  20. Institutional plan. Fiscal year, 1997--2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-10-01

    The Institutional Plan is the culmination of Argonne`s annual planning cycle. The document outlines what Argonne National Laboratory (ANL) regards as the optimal development of programs and resources in the context of national research and development needs, the missions of the Department of Energy and Argonne National Laboratory, and pertinent resource constraints. It is the product of ANL`s internal planning process and extensive discussions with DOE managers. Strategic planning is important for all of Argonne`s programs, and coordination of planning for the entire institution is crucial. This Institutional Plan will increasingly reflect the planning initiatives that have recently been implemented.

  1. 34 CFR 406.1 - What is the State-Administered Tech-Prep Education Program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... provides financial assistance for— (a) Planning and developing four-year or six-year programs designed to...) Planning and developing, in a systematic manner, strong, comprehensive links between secondary schools and...

  2. AUA Program Master Plan. Volume 1: Overview

    DOT National Transportation Integrated Search

    1997-03-01

    The Office of Air Traffic Systems Development (AUA) Program Master Plan : summarizes the management, development approach, and status of products and : services provided by the AUA organization to fulfill its role in supporting : National Airspace Sy...

  3. Domestic, international family planning programs at risk.

    PubMed

    Turnbull, W; Kaeser, L

    1998-02-01

    The US government has subsidized family planning services domestically and abroad for three decades. For most of that period, the support has been provided with the broad-based backing of both US lawmakers and the general public. However, recent polling indicates that public support for family planning programs remains strong, but not necessarily among legislators. Since Republicans gained control of the US House of Representatives in 1995, a well-organized opposition to government-subsidized family planning has developed. The House leadership has launched attacks to defund and abolish Title X, the core domestic family planning program, and the US Agency for International Development's (USAID) population assistance program. Although these attempts failed, a parallel strategy is being pursued to raise anxieties about the programs and chip away at members' support for them. Family planning supporters in Congress and the White House are on the defensive. Rather than fighting for funding increases and new program initiatives, family planning advocates have been forced to try to just hold their ground. Even though they rest intact, Title X and USAID funding has suffered and the programs' base of congressional support has been seriously compromised. With the current Republican domination of the House, Title X and USAID face an uncertain future.

  4. Workshop Proceedings: Sensor Systems for Space Astrophysics in the 21st Century, Volume 2

    NASA Technical Reports Server (NTRS)

    Wilson, Barbara A. (Editor)

    1991-01-01

    In 1989, the Astrophysics Division of the Office of Space Science and Applications initiated the planning of a technology development program, Astrotech 21, to develop the technological base for the Astrophysics missions developed in the period 1995 to 2015. The Sensor Systems for Space Astrophysics in the 21st Century Workshop was one of three Integrated Technology Planning workshops. Its objectives were to develop an understanding of the future comprehensive development program to achieve the required capabilities. Program plans and recommendations were prepared in four areas: x ray and gamma ray sensors, ultraviolet and visible sensors, direct infrared sensors, and heterodyne submillimeter wave sensors.

  5. The requirements and feasibility of business planning in the office of space and terrestrial applications

    NASA Technical Reports Server (NTRS)

    Greenberg, J. S.; Miller, B. P.

    1979-01-01

    The feasibility of applying strategic business planning techniques which are developed and used in the private sector to the planning of certain projects within the NASA Office of Space and Terrestrial Applications was assessed. The methods of strategic business planning that are currently in use in the private sector are examined. The typical contents of a private sector strategic business plan and the techniques commonly used to develop the contents of the plan are described, along with modifications needed to apply these concepts to public sector projects. The current long-range planning process in the Office of Space and Terrestrial Applications is reviewed and program initiatives that might be candidates for the use of strategic business planning techniques are identified. In order to more fully illustrate the information requirements of a strategic business plan for a NASA program, a sample business plan is prepared for a hypothetical Operational Earth Resources Satellite program.

  6. Strategic Planning and Doctor Of Nursing Practice Education: Developing Today's and Tomorrow's Leaders.

    PubMed

    Falk, Nancy L; Garrison, Kenneth F; Brown, Mary-Michael; Pintz, Christine; Bocchino, Joseph

    2015-01-01

    Strategic planning and thinking skills are essential for today's nurse leaders. Doctor of nursing practice (DNP) programs provide an opportunity for developing effective nurse strategists. A well-designed strategy course can stimulate intellectual growth at all levels of Bloom's Taxonomy. Discussion forums in online education provide new opportunities for rich interaction among peers en route to development of well-informed strategic plans. An interprofessional perspective adds a rich and vital aspect to doctoral nursing education and it serves to inform strategic plan development. A roadmap for teaching strategic planning to current and future nursing leaders will guide the integration of essential content into DNP programs.

  7. Compare and Contrast Program Planning Models

    ERIC Educational Resources Information Center

    Baskas, Richard S.

    2011-01-01

    This paper will examine the differences and similarities between two program planning models, Tyler and Caffarella, to reveal their strengths and weaknesses. When adults are involved in training sessions, there are various program planning models that can be used, depending on the goal of the training session. Researchers developed these models…

  8. A Comparison of Traditional Worksheet and Linear Programming Methods for Teaching Manure Application Planning.

    ERIC Educational Resources Information Center

    Schmitt, M. A.; And Others

    1994-01-01

    Compares traditional manure application planning techniques calculated to meet agronomic nutrient needs on a field-by-field basis with plans developed using computer-assisted linear programming optimization methods. Linear programming provided the most economical and environmentally sound manure application strategy. (Contains 15 references.) (MDH)

  9. Focus on training at CAFS.

    PubMed

    Azorbo, S; Muna, C

    1993-01-01

    The training and technical assistance programs of the Center for African Family Studies (CAFS), which is part of the International Planned Parenthood Federation for the African Region, were described. Programs included service delivery, management development, family life education, family planning communication, and research monitoring and evaluation. Several courses were offered: a week-long contraceptive technology update course for trainers and supervisors of family planning programs. Management training needs were filled through a 6-week middle level management course, a 2-week senior level management course, a 4-week community based family planning program course, a 6-week financial management of family planning and reproductive health programs course, and a 5-week course in leadership skills for management of women and health programs. Family life education courses were offered under the CAFS Women and Health Program for teachers, curriculum developers, youth leaders, and those working with young people for 3 weeks. Course issues of discussion included population and development, the family in contemporary African life, and policy legislation and laws to promote young people's health and social psychological and ethical aspects of adolescent sexuality. Family planning communication training programs were directed to strengthening IEC knowledge and skills over a 4-week period for senior and middle level personnel. The 3-week press course aimed to train journalists in print and electronic media for French-speaking countries who could gain cover population and family planning issues. The family planning research and evaluation course over 4 weeks aimed to increase the knowledge and skills of health personnel in project design, implementation, monitoring, and evaluation, in order to conduct assessment of program effectiveness. The course was directed to senior and middle level manager researchers, population project directors, and personnel of women-centered projects.

  10. Rural development and family planning behavior in Bangladesh Villages.

    PubMed

    Alauddin, M

    1979-01-01

    Variarion in knowledge and usage of contraceptive methods was examined across Bangladesh villages. It was hypothesized that the variation can be explained by 3 sets of factors measured at the village level: development programs, family planning program efforts, and given environmental and socioeconomic conditions. The data were drawn from the Bangladesh Fertility Survey and the 1974 Bangladesh Population Census. The 3 sets of factors taken together explained a greater proportion of the variance in knowledge and contraceptive usage than each of the sets taken either singly or in paired combination. Knowledge of clinical contraceptive methods was found to be affected more by development programs than by either family planning or environmental and socioeconomic conditions. Despite the fact that both development and family planning variables have independent and about equal effects on ever use of contraception, each of them separately is not likely to produce as much contraceptive usage as would both of them jointly. In terms of policy, if both development and family planning programs are provided to the villages, the effect on fertility may be maximized.

  11. A successful integrated project.

    PubMed

    Zheng, P

    1994-10-01

    The experiences of the Juxian County Family Planning Committee of Shandong Province, China, were discussed in terms of the integration of family planning with income generation activities in rural areas. The integrated program was initiated in 1988 with pilot programs established by the Qiaoshan Family Planning Association to develop marketable skills in carpet weaving and grass braiding in Xiazhuang Town and Qiaoshan Township. The program gave priority of admission to women with only children and those who practiced family planning. 1400 women were recruited in these factories. Other income generation programs were developed for silkworm breeding and silk reeling, woolen embroidery, and printing. High ranking officials of the China Family Planning Association commended the work in income generation and family planning in Juxian County. This recognition spurred the second phase of development by the county family planning association: the establishment of village operated factories and mills for native products. By the end of 1991, there were 26 such projects in the county and per capita income to women increased by RMB 678 yuan. In the third stage of 1992, the number of association enterprises increased to 196 with recruitment of over 18,000 reproductive age women. The programs were initiated with collective funds from farmers and villages. The 170 projects in 1992 were developed with an investment of 9.6 million yuan, of which 2.26 million yuan was from individuals (23.5%). Emphasis was placed on self-reliance and recruitment of women with one child, women with 2 daughters and tubal ligations, and family planning motivators. The consequences of the integrated program were weakening traditional customs of marriage and childbearing, improvement in socioeconomic status of women, and effective service delivery of family planning and maternal and child health care services.

  12. Quality Assurance Planning for Region 9

    EPA Pesticide Factsheets

    The ultimate success of an environmental program or project depends on the quality of the environmental data collected and used in decision-making. EPA has developed guidances to help state and tribal governments develop Quality Assurance Program Plans.

  13. National ITS/CVO program

    DOT National Transportation Integrated Search

    1997-02-01

    This report was developed as part of the study, Systems Planning for Automated Commercial Vehicle Licensing and Permitting Systems. The objective of this study was to define the requirements and develop a plan for a national program to apply In...

  14. Autonomous Vehicle Mission Planning Using AI (Artificial Intelligence) Techniques.

    DTIC Science & Technology

    1985-12-01

    it uses are declarative patterns that encode facts about how goals may give rise to - . plans. The program processes a story a sentence at a time...the planning process. By separating the knowledge about how to plan from the specific domain knowledge, an understander can use this knowledge about how ...path planning program developed in a previous thesis effort will be incorporated into the overall program in order to demonstrate the operating system

  15. Developing guidelines for incorporating managing demand into WSDOT planning and programming: transportation demand management guidance for corridor planning studies.

    DOT National Transportation Integrated Search

    2016-02-01

    The Washington State Department of Transportation (WSDOT) regional planning programs address current and forecasted deficiencies of State highways through the conduct of corridor studies. This Guidance for the conduct of corridor planning studies is ...

  16. 45 CFR 1386.36 - Final disapproval of the State plan or plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON DEVELOPMENTAL DISABILITIES, DEVELOPMENTAL DISABILITIES PROGRAM FORMULA GRANT PROGRAMS Federal Assistance to State Developmental Disabilities Councils § 1386.36 Final disapproval of the State plan or plan...

  17. Integrated Technology Plan for the Civil Space Program, 1991

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The purpose of the Integrated Technology Plan (ITP) is to serve as a strategic plan for the OAST space research and technology (R&T) program, and as a strategic planning framework for other NASA and national participants in advocating and conducting technology developments that support future U.S. civil space missions. The ITP begins with a discussion of the national policy and NASA organization which establishes the overall framework for civil space R&T planning. The second chapter provides a top-level review of the potential users of civil space R&T, their strategic mission plans, and the technologies they have identified as needed to achieve those plans. The overall methodology used to develop a civil space technology strategy is discussed. The technical details of the 1991 strategic plan are described, ending with a review of civil space R&T priorities. The fourth chapter describes how the strategic plan is annually translated into the OAST Space R&T Program, with a summary of the fiscal year 1992 program. The ITP concludes with a discussion of requirements for technology development coordination and strategies for facilitating the transfer of civil space technology to the private sector. Several appendices also are attached that provide further information regarding budget implications of the strategic plan, organizational roles, and other topics.

  18. Generalizable Skills in Individualized Vocational Program Planning for Special Needs Students.

    ERIC Educational Resources Information Center

    Stodden, Robert A.; Boone, Rosalie

    1986-01-01

    The authors address planning issues and suggest methods of interagency cooperation, integration of generalizable skills in individualized educational planning/programming, developing goals and objectives, and using student assessment and evaluation information. (CT)

  19. Problem identification for Virginia's highway safety plan.

    DOT National Transportation Integrated Search

    1982-01-01

    Problem identification is recognized as an important component of highway safety planning. Under the NHTSA/FHWA concept, problem identification is the first step in program planning and in the development of effective countermeasure programs. The ann...

  20. A Planning Approach for Developing Inventory and Monitoring Programs In National Parks

    Treesearch

    David L. Peterson; David G. Silsbee; Daniel L. Schmoldt

    1995-01-01

    This document offers some conceptual ideas on how individual parks could plan and implement an Inventory and Monitoring (I&M) program. In several respects, the authors ideas parallel and complement the I&M project planning and development process outlined in the Natural Resources Inventory and Monitoring Guideline (NPS-75). However, no universal techniques...

  1. United States of America (country/area statements).

    PubMed

    1985-09-01

    This statement presented to the Committee on Population of the UN Economic and Social Commission for Asia and the Pacific (ESCAP) cites the goal of population assistance contained in the preamble of the Report of the International Conference on Population, which was to improve the population's standard of living and quality of life. ESCAP program activities should embody various points from the International Conference on population at Mexico City, including an emphasis on the mutually reinforcing roles of population and other development programs, well developed family planning programs in which abortion is not presented as a method of family planning, measures to ensure full integration of women into all phases of development, research to develop improved methods of contraception and service delivery, and important roles for nongovernmental organizations and the private sector. The US position on population assistance has 3 main elements: the expansion of voluntary family planning services throughout the developing world, the unacceptability of abortion as a family planning method, and the need for wise economic policies in addition to family planning services. In some countries family planning can alleviate high population growth rates which seriously overburden already inadequate resources, and in others family planning is more important to the health and welfare of individual mothers and children. The US agrees with the opinion of the Mexico City Conference that private sector organizations can make significant contributions in family planning. During the past 2 decades, the US has provided over $US2500 million in population assistance to developing countries through bilateral agreements, multilateral institutions, and private organizations. The US intends to continue its support for population programs which slow population growth, promote economic development, and respect internationally recognized human rights. Coercion in family planning programs cannot be reconciled with the principle that all couples and individuals have the basic right to decide freely and responsably the number and spacing of their children and to have the information and means to do so. Voluntarism is an essential element in population programs because family planning touches the most intimate areas of the lives of couples, because longterm change in fertility behavior is achieved only when the choices reflect the free decisions of couples, because user-preferences and the motivation of providers to improve program acceptability are compromised by coercion, and because voluntarism is a basic human right.

  2. The Development of a Planning, Programming and Budgeting System. Technical Report.

    ERIC Educational Resources Information Center

    Appelquist, Claes-Goran; Zandren, S.

    In CERI's program on institutional management in higher education, eight universities were brought together to set up teams within their institutions to work on their respective pre-selected problem areas. The planning, programming and budgeting system (PPBS) was developed as a management tool which would improve effectiveness by increasing the…

  3. Peer Tutoring: A Guide to Program Design. Research and Development Series No. 260.

    ERIC Educational Resources Information Center

    Ashley, William L.; And Others

    This publication presents guidelines for planning, implementing, and evaluating a peer tutoring program within a vocational setting. Chapter 1 discusses benefits of peer tutoring and presents a compilation of guidelines, suggestions, and examples for planning, developing, and evaluating a peer tutoring program. Tasks in each area--program…

  4. Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Millard, W. David; Johnson, Daniel M.; Henderson, John M.

    2014-07-28

    Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedbackmore » during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.« less

  5. 18 CFR 708.3 - Policy, objectives, and standards.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... program developed by the Commission as part of the Master Plan are: (1) To develop awareness of public... officials. In developing the plan, the Commission is required to identify various economic, recreational... program of public participation involving fair representation of all segments of the public. The public...

  6. 76 FR 9044 - Notice of Extension of Information Collection for Public Comment; Consolidated Plan and Annual...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-16

    ... the Assistant Secretary for Community Planning and Development, HUD. ACTION: Notice of Extension of... requirements for Consolidated Planning for Community Planning and Development (CPD) programs described below... INFORMATION CONTACT: Salvatore Sclafani, Office of Community Planning & Development, telephone (202) 402-4364...

  7. Corrosion Prevention and Control Planning Guidebook Spiral 3

    DTIC Science & Technology

    2007-09-01

    programs. 5. Develop and recommend corrective and preventive procedures based on reliability and maintainability analyses of field data on similar in...One of the many challenges facing the Program/Acquisition Managers is the ability to develop a meaningful Corrosion Prevention and Control Plan...designated program manager of all activities associated with the acquisition, development , production, fielding , sustainment, and disposal of a DoD weapon

  8. NASA science utilization plans for the Space Station.

    PubMed

    Reeves, E M; Cressy, P J

    1995-10-01

    The Mir-1 and International Space Station Alpha capabilities present the science community with unique long duration platforms to conduct a wide range of scientific research in the microgravity and life sciences as well as in the observational sciences, NASA is developing plans to use the capabilities of Mir and Space Station as they emerge during the development of the orbital program. In both cases the planned science utilization programs take advantage of the volume, crew, power, microgravity and logistics resupply unique to each phase. The paper will present these utilization plans in the context of an evolving scientific program.

  9. Guidelines for developing traffic incident management plans for work zones

    DOT National Transportation Integrated Search

    2003-09-01

    The Colorado Department of Transportation (CDOT) has led the development of a number of traffic incident management plans and programs throughout the state. These programs address procedural and coordination aspects of managing unplanned events on th...

  10. Using intervention mapping to develop a breast and cervical cancer screening program for Hispanic farmworkers: Cultivando La Salud.

    PubMed

    Fernández, Maria E; Gonzales, Alicia; Tortolero-Luna, Guillermo; Partida, Sylvia; Bartholomew, L Kay

    2005-10-01

    This article describes the development of the Cultivando La Salud program, an intervention to increase breast and cervical cancer screening for Hispanic farmworker women. Processes and findings of intervention mapping (IM), a planning process for development of theory and evidence-informed program are discussed. The six IM steps are presented: needs assessment, preparation of planning matrices, election of theoretic methods and practical strategies, program design, implementation planning, and evaluation. The article also describes how qualitative and quantitative findings informed intervention development. IM helped ensure that theory and evidence guided (a) the identification of behavioral and environmental factors related to a target health problem and (b) the selection of the most appropriate methods and strategies to address the identified determinants. IM also guided the development of program materials and implementation by lay health workers. Also reported are findings of the pilot study and effectiveness trial.

  11. A Plan for Action by the National 4-H Urban Program Development Committee.

    ERIC Educational Resources Information Center

    National Four-H Club Foundation, Washington, DC.

    The National 4-H Urban Program Development Committee's Plan for Action outlines some of the primary concerns of the urban 4-H program. It discusses the need for 4-H in urban areas and the particular relevance of sound program design and delivery in helping urban youth, especially those from low-income families, to find ways to improve their…

  12. Louisiana SIP: LAC 33:III Ch. 14 Subchap B, 1431 to 1434--Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded, or Approved Under Title 23 U.S.C. or the Federal Transit Laws

    EPA Pesticide Factsheets

    Louisiana SIP: LAC 33:III Ch. 14 Subchap B, 1431 to 1434--Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded, or Approved Under Title 23 U.S.C. or the Federal Transit Laws

  13. Guidelines for Analysis of Communicable Disease Control Planning in Developing Countries. Volume 1: Communicable Diseases Control Planning. International Health Planning Methods Series.

    ERIC Educational Resources Information Center

    Chin, James

    Intended to assist Agency for International Development (AID) officers, advisors, and health officials in incorporating health planning into national plans for economic development, this first of ten manuals in the International Health Planning Methods Series deals with planning and evaluation of communicable disease control programs. The first…

  14. Laboratory Directed Research and Development Program FY2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none, none

    2012-04-27

    Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2011 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). Going forward in FY 2012, the LDRD program also supports themore » Goals codified in the new DOE Strategic Plan of May, 2011. The LDRD program also supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the Office of Science Program Offices, such as LDRD projects germane to new research facility concepts and new fundamental science directions. Brief summares of projects and accomplishments for the period for each division are included.« less

  15. Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

    NASA Technical Reports Server (NTRS)

    Dickinson, William B.

    1995-01-01

    An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

  16. 7 CFR 625.12 - The HFRP restoration plan development.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false The HFRP restoration plan development. 625.12 Section... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE WATER RESOURCES HEALTHY FORESTS RESERVE PROGRAM § 625.12 The HFRP restoration plan development. (a) The development of the HFRP restoration plan shall be made...

  17. Using business plan development as a capstone project for MPH programs in Canada: validation through the student perspective.

    PubMed

    Papadopoulos, Andrew; Britten, Nicole; Hatcher, Meghan; Rainville, Keira

    2013-10-01

    Master of Public Health (MPH) programs have been developed across Canada as a response to the need for adequately trained individuals to work in the public health sector. Educational institutions that deliver MPH programs have a responsibility to ensure that graduates of their program have the essential knowledge, skills and attitudes to begin a successful career in public health. The Public Health Agency of Canada has created the core competencies for public health to guide the development, delivery and evaluation of MPH programs. In Canada, a capstone project is the recommended method of evaluating the MPH graduate's ability to demonstrate proficiency in the public health core competencies. A business plan that develops the framework for a public health program is an ideal capstone project currently used in practice within the University of Guelph MPH program. This group assignment incorporates all 36 of the public health core competencies while providing students with a real-world public health experience, and should be considered for inclusion within MPH programs across Canada. Business planning provides students the opportunity to engage in practice-based learning, applying theoretical knowledge to practice. Further, the ability to develop realistic but financially feasible public health problems is an invaluable skill for MPH graduates. As the development of programs becomes more restricted and the continuation of other programs are under constant threat, the ability to develop a sound business plan is a required skill for individuals entering the public health sector, and will ensure students are able to maximize outcomes given tight fiscal budgets and limited resources.

  18. 75 FR 39035 - Notice of Submission of Proposed Information Collection to OMB; Emergency Comment Request...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-07

    ... Community Planning and Development (CPD) Programs AGENCY: Office of the Chief Information Officer, HUD... Assistance for Community Planning and Development (CPD) Programs. Description of Information Collection... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-59] Notice of Submission of...

  19. Defense Advanced Research Projects Agency Fiscal Year 1978 Research & Development Program. Statement by Dr. George H. Heilmeier, Director Before the Subcommittee on Research & Development of Senate Armed Services Committee

    DTIC Science & Technology

    1977-02-01

    CONTENTS I. INTRODUCTION ------------------------------------------- -I A. DARPA PROGRAM PLANS AND PROGRESS ------------------- 1-6 1. High Energy...beyond. In brief, we have followed our long-range plan and have impressive progress to report. A. DARPA Program Plans and Progress 1. High Energy Lasers...stimulate growth of technological "saplings" that have proven promising; and (3) harvest those technologies that have become mature "trees." These three

  20. Natural and accelerated bioremediation research program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE`s Office of Environmental Management (EM). The program builds on OHER`s tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER`s and Office of Energy Research`s (OER`s) commitment to supporting DOE`s environmental management mission and the belief that bioremediation is an important part of themore » solution to DOE`s environmental problems.« less

  1. 41 CFR 101-26.506-1 - Types of service.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAM 26.5-GSA Procurement Programs § 101-26.506-1 Types of service. GSA interior planning and design...; softline space plans; development of an interior design program (to include finish materials, furniture and...

  2. 7 CFR 23.13 - Plan of Work.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... multi-State organizations or bodies for those activities of the Regional Rural Development Centers which... of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK Regional Program § 23.13 Plan of Work. (a) A Regional Plan of Work for carrying out the programs authorized to be funded under...

  3. Andrews University Master Plan for Campus Expansion and the Development Program, 1977-1985.

    ERIC Educational Resources Information Center

    Smoot, Joseph G.

    Described in detail in this partly promotional, partly informational publication are the history of campus planning, new master plan, and new capital programs of this Seventh Day Adventist institution. Numerous maps, photographs, and tables of financial and statistical data illustrate the plan. (MSE)

  4. Societal and Educational Projections, Appendix A. Vol. II, A Plan for Managing the Development, Implementation and Operation of a Model Elementary Teacher Education Program.

    ERIC Educational Resources Information Center

    Corley, Clifford L.; Koch, Norman E.

    The purpose of this paper is to identify and describe background information and possible indicators for future planning of elementary education, as a prerequisite to planning realistic education programs for early childhood and elementary school teachers. Developments considered include population growth, changing cultural characteristics,…

  5. Developing an interdisciplinary certificate program in transportation planning, phase 2 : the eCertificate.

    DOT National Transportation Integrated Search

    2011-11-01

    This proposal extends the delivery of the recently developed graduate Certificate in Transportation : Planning to a wider audience through the establishment of an Executive Certificate Program by distance : (eCertificate). While the need for an inter...

  6. Integrating Computer-Based Career Development into Your Career Planning Program.

    ERIC Educational Resources Information Center

    Campbell, Robert B.; Mack, Sharon E.

    This paper focuses on the real and theoretical usefulness of a computer-based career development system in a career planning program, based on a 2-year pilot program evaluating the DISCOVER system. The system overview discusses components and contents of DISCOVER, and describes the 11 modules which assist users in learning about their values,…

  7. Using the Logic Model to Plan Extension and Outreach Program Development and Scholarship

    ERIC Educational Resources Information Center

    Corbin, Marilyn; Kiernan, Nancy Ellen; Koble, Margaret A.; Watson, Jack; Jackson, Daney

    2004-01-01

    In searching for a process to help program teams of campus-based faculty and field-based educators develop five-year and annual statewide program plans, cooperative extension administrators and specialists in Penn State's College of Agricultural Sciences discovered that the use of the logic model process can influence the successful design of…

  8. Supporting research and technology for automotive Stirling engine development

    NASA Technical Reports Server (NTRS)

    Tomazic, W. A.

    1980-01-01

    The technology advancement topics described are a part of the supporting research and technology (SRT) program conducted to support the major Stirling engine development program. This support focuses on developing alternatives or backups to the engine development in critical areas. These areas are materials, seals control, combustors and system analysis. Specific objectives and planned milestone schedules for future activities as now envisioned are described. These planned SRT activities are related to the timeline of the engine development program that they must support.

  9. Development of an Operational Model for the Application of Planning-Programming-Budgeting Systems in Local School Districts. Program Budgeting Note 1, Introduction to Program Budgeting.

    ERIC Educational Resources Information Center

    State Univ. of New York, Buffalo. Western New York School Study Council.

    Although the public is best served by governmental agencies which have integrated the major functions of planning, managing, and budgeting, it can be asserted that the planning function is paramount. A review of the evolution of public agency administration in the U.S. reveals that until recent years the planning function has been largely…

  10. ISS Payload Operations: The Need for and Benefit of Responsive Planning

    NASA Technical Reports Server (NTRS)

    Nahay, Ed; Boster, Mandee

    2000-01-01

    International Space Station (ISS) payload operations are controlled through implementation of a payload operations plan. This plan, which represents the defined approach to payload operations in general, can vary in terms of level of definition. The detailed plan provides the specific sequence and timing of each component of a payload's operations. Such an approach to planning was implemented in the Spacelab program. The responsive plan provides a flexible approach to payload operations through generalization. A responsive approach to planning was implemented in the NASA/Mir Phase 1 program, and was identified as a need during the Skylab program. The current approach to ISS payload operations planning and control tends toward detailed planning, rather than responsive planning. The use of detailed plans provides for the efficient use of limited resources onboard the ISS. It restricts flexibility in payload operations, which is inconsistent with the dynamic nature of the ISS science program, and it restricts crew desires for flexibility and autonomy. Also, detailed planning is manpower intensive. The development and implementation of a responsive plan provides for a more dynamic, more accommodating, and less manpower intensive approach to planning. The science program becomes more dynamic and responsive as the plan provides flexibility to accommodate real-time science accomplishments. Communications limitations and the crew desire for flexibility and autonomy in plan implementation are readily accommodated with responsive planning. Manpower efficiencies are accomplished through a reduction in requirements collection and coordination, plan development, and maintenance. Through examples and assessments, this paper identifies the need to transition from detailed to responsive plans for ISS payload operations. Examples depict specific characteristics of the plans. Assessments identify the following: the means by which responsive plans accommodate the dynamic nature of science programs and the crew desire for flexibility; the means by which responsive plans readily accommodate ISS communications constraints; manpower efficiencies to be achieved through use of responsive plans; and the implications of responsive planning relative to resource utilization efficiency.

  11. Educator's Guide to Program Development in Natural Resources: Program Development Summary.

    ERIC Educational Resources Information Center

    Yoder, Jon; Maine, Neal

    2001-01-01

    Distinguishes between natural resource programs and natural resource projects and provides a project planning outline. Addresses critical elements and concerns in the development of natural resource programs. (DDR)

  12. A Technology Plan for Enabling Commercial Space Business

    NASA Technical Reports Server (NTRS)

    Lyles, Garry M.

    1997-01-01

    The National Aeronautics and Space Administration's (NASA) Advanced Space Transportation Program is a customer driven, focused technology program that supports the NASA Strategic Plan and considers future commercial space business projections. The initial cycle of the Advanced Space Transportation Program implementation planning was conducted from December 1995 through February 1996 and represented increased NASA emphasis on broad base technology development with the goal of dramatic reductions in the cost of space transportation. The second planning cycle, conducted in January and February 1997, updated the program implementation plan based on changes in the external environment, increased maturity of advanced concept studies, and current technology assessments. The program has taken a business-like approach to technology development with a balanced portfolio of near, medium, and long-term strategic targets. Strategic targets are influenced by Earth science, space science, and exploration objectives as well as commercial space markets. Commercial space markets include those that would be enhanced by lower cost transportation as well as potential markets resulting in major increases in space business induced by reductions in transportation cost. The program plan addresses earth-to-orbit space launch, earth orbit operations and deep space systems. It also addresses all critical transportation system elements; including structures, thermal protection systems, propulsion, avionics, and operations. As these technologies are matured, integrated technology flight experiments such as the X-33 and X-34 flight demonstrator programs support near-term (one to five years) development or operational decisions. The Advanced Space Transportation Program and the flight demonstrator programs combine business planning, ground-based technology demonstrations and flight demonstrations that will permit industry and NASA to commit to revolutionary new space transportation systems beginning at the turn of the century and continuing far into the future.

  13. Integrated flexible manufacturing program for manufacturing automation and rapid prototyping

    NASA Technical Reports Server (NTRS)

    Brooks, S. L.; Brown, C. W.; King, M. S.; Simons, W. R.; Zimmerman, J. J.

    1993-01-01

    The Kansas City Division of Allied Signal Inc., as part of the Integrated Flexible Manufacturing Program (IFMP), is developing an integrated manufacturing environment. Several systems are being developed to produce standards and automation tools for specific activities within the manufacturing environment. The Advanced Manufacturing Development System (AMDS) is concentrating on information standards (STEP) and product data transfer; the Expert Cut Planner system (XCUT) is concentrating on machining operation process planning standards and automation capabilities; the Advanced Numerical Control system (ANC) is concentrating on NC data preparation standards and NC data generation tools; the Inspection Planning and Programming Expert system (IPPEX) is concentrating on inspection process planning, coordinate measuring machine (CMM) inspection standards and CMM part program generation tools; and the Intelligent Scheduling and Planning System (ISAPS) is concentrating on planning and scheduling tools for a flexible manufacturing system environment. All of these projects are working together to address information exchange, standardization, and information sharing to support rapid prototyping in a Flexible Manufacturing System (FMS) environment.

  14. Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan

    NASA Technical Reports Server (NTRS)

    Smith, Janice F. (Compiler); Forrest, Larry

    1993-01-01

    A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.

  15. 24 CFR 570.415 - Community Development Work Study Program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and economic development, community planning, and community management. The primary objectives of the... economic development, community planning, and community management, and to provide a cadre of well... economic development, community planning, community management, land use and housing activities. Community...

  16. Study of solid rocket motor for space shuttle booster, Volume 3: Program acquisition planning

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The program planning acquisition functions for the development of the solid propellant rocket engine for the space shuttle booster is presented. The subjects discussed are: (1) program management, (2) contracts administration, (3) systems engineering, (4) configuration management, and (5) maintenance engineering. The plans for manufacturing, testing, and operations support are included.

  17. National ITS Program Plan Intelligent Transportation Systems Volume I

    DOT National Transportation Integrated Search

    1995-03-01

    ADVANCED TRAVELER INFORMATION SYSTEMS OR ATIS : THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS, THE FIRST EDITION OF THE PLAN WAS A JOINT ...

  18. Interim guidance for implementing SAFETEA-LU provisions on planning, environment, and air quality for FHWA authorities

    DOT National Transportation Integrated Search

    2007-02-14

    This final rule revises the regulations governing the development of metropolitan transportation plans and programs for urbanized areas, State transportation plans and programs and the regulations for Congestion Management Systems. The revision resul...

  19. National ITS Program Plan Executive Summary

    DOT National Transportation Integrated Search

    1995-03-01

    THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS FIRST EDITION OF THE PLAN WAS A JOINT EFFORT OF ITS AMERICA AND THE UNITED STATES DEPARTMEN...

  20. Louisiana Airport System Plan Five-Year Capital Improvement Program.

    DOT National Transportation Integrated Search

    1992-07-01

    The Louisiana Airport System Plan (LASP) Five-Year-Capital Improvement Program (CIP) is a development plan for all commercial service, reliever, and general aviation airports in Louisiana. It is a detailed listing of potential projects based on the a...

  1. 23 CFR 450.212 - Transportation planning studies and project development.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Transportation planning studies and project development. 450.212 Section 450.212 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450...

  2. 23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...

  3. 23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...

  4. 23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...

  5. 23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...

  6. 23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...

  7. LBNL Laboratory Directed Research and Development Program FY2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ho, D.

    2017-03-01

    The Berkeley Lab Laboratory Directed Research and Development Program FY2016 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the supported projects and summarizes their accomplishments. It constitutes a part of the LDRD program planning and documentation process that includes an annual planning cycle, project selection, implementation and review.

  8. A Plan for Development of an Educational Telephone Network (ETN) to Extend Access to Educational Programs.

    ERIC Educational Resources Information Center

    Los Angeles Community Coll. District, CA. Div. of Educational Planning and Development.

    The outreach development process described in this document is designed to provide a model for planning and implementing a program to extend access to educational opportunity for members of the community served by the Los Angeles Community College District. There are four steps required to initiate such a program: (1) Identification--each college…

  9. 34 CFR 200.27 - Development of a schoolwide program plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... school year. (2) The school must develop the comprehensive plan with the involvement of parents... comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the..., parents, and the public. (2) Information in the plan must be— (i) In an understandable and uniform format...

  10. 77 FR 4824 - Notice of Revised Information Collection for Public Comment; Consolidated Plan & Annual...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-31

    ... Secretary for Community Planning and Development, HUD. ACTION: Notice of revised information collection for... Community Planning and Development (CPD) programs described below will be submitted to the Office of... Community Planning and Development, telephone (202) 402-3669 (this is not a toll- free number...

  11. 42 CFR 56.501 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Grants for Planning and Developing Migrant Health Programs § 56.501 Applicability. The regulations of... awarded pursuant to section 319(c)(1)(B) of the Act for projects to plan and develop migrant health programs to provide health services to migratory agricultural workers, seasonal agricultural workers and...

  12. 42 CFR 56.501 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Grants for Planning and Developing Migrant Health Programs § 56.501 Applicability. The regulations of... awarded pursuant to section 319(c)(1)(B) of the Act for projects to plan and develop migrant health programs to provide health services to migratory agricultural workers, seasonal agricultural workers and...

  13. Bangladesh.

    PubMed

    Ahmed, K S

    1979-01-01

    In Bangladesh the Population Control and Family Planning Division of the Ministry of Health and Population Control has decided to delegate increased financial and administrative powers to the officers of the family planning program at the district level and below. Currently, about 20,000 family planning workers and officials are at work in rural areas. The government believes that the success of the entire family planning program depends on the performance of workers in rural areas, because that is where about 90% of the population lives. Awareness of the need to improve statistical data in Bangladesh has been increasing, particularly in regard to the development of rural areas. An accurate statistical profile of rural Bangladesh is crucial to the formation, implementation and evaluation of rural development programs. A Seminar on Statistics for Rural Development will be held from June 18-20, 1980. The primary objectives of the Seminar are to make an exhaustive analysis of the current availability of statistics required for rural development programs and to consider methodological and operational improvements toward building up an adequate data base.

  14. Development of a program logic model and evaluation plan for a participatory ergonomics intervention in construction.

    PubMed

    Jaegers, Lisa; Dale, Ann Marie; Weaver, Nancy; Buchholz, Bryan; Welch, Laura; Evanoff, Bradley

    2014-03-01

    Intervention studies in participatory ergonomics (PE) are often difficult to interpret due to limited descriptions of program planning and evaluation. In an ongoing PE program with floor layers, we developed a logic model to describe our program plan, and process and summative evaluations designed to describe the efficacy of the program. The logic model was a useful tool for describing the program elements and subsequent modifications. The process evaluation measured how well the program was delivered as intended, and revealed the need for program modifications. The summative evaluation provided early measures of the efficacy of the program as delivered. Inadequate information on program delivery may lead to erroneous conclusions about intervention efficacy due to Type III error. A logic model guided the delivery and evaluation of our intervention and provides useful information to aid interpretation of results. © 2013 Wiley Periodicals, Inc.

  15. Development of a Program Logic Model and Evaluation Plan for a Participatory Ergonomics Intervention in Construction

    PubMed Central

    Jaegers, Lisa; Dale, Ann Marie; Weaver, Nancy; Buchholz, Bryan; Welch, Laura; Evanoff, Bradley

    2013-01-01

    Background Intervention studies in participatory ergonomics (PE) are often difficult to interpret due to limited descriptions of program planning and evaluation. Methods In an ongoing PE program with floor layers, we developed a logic model to describe our program plan, and process and summative evaluations designed to describe the efficacy of the program. Results The logic model was a useful tool for describing the program elements and subsequent modifications. The process evaluation measured how well the program was delivered as intended, and revealed the need for program modifications. The summative evaluation provided early measures of the efficacy of the program as delivered. Conclusions Inadequate information on program delivery may lead to erroneous conclusions about intervention efficacy due to Type III error. A logic model guided the delivery and evaluation of our intervention and provides useful information to aid interpretation of results. PMID:24006097

  16. Planning and environment linkages program : a guide to measuring progress in linking transportation planning and environmental analysis

    DOT National Transportation Integrated Search

    2009-12-01

    Transportation agencies use a variety of metrics to document progress toward achieving specific goals and objectives. This guide, developed by Federal Highway Administration (FHWA) Planning and Environmental Linkages (PEL) program, is intended to hel...

  17. National ITS Program Plan, Intelligent Transportation Systems, Synopsis

    DOT National Transportation Integrated Search

    THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS, THE FIRST EDITION OF THE PLAN WAS A JOINT EFFORT OF ITS AMERICA AND THE UNITED STATES DEPA...

  18. 24 CFR 91.315 - Strategic plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Strategic plan. 91.315 Section 91... CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS State Governments; Contents of Consolidated Plan § 91.315 Strategic plan. (a) General. For the categories described in paragraphs (b), (c), (d...

  19. Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa G.; McNair, Ann R. (Technical Monitor)

    2002-01-01

    The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

  20. Lessons Learned in Developing Multiple Distributed Planning Systems for the International Space Station

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa G.

    2002-01-01

    The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

  1. Impact of computer-based treatment planning software on clinical judgment of dental students for planning prosthodontic rehabilitation

    PubMed Central

    Deshpande, Saee; Chahande, Jayashree

    2014-01-01

    Purpose Successful prosthodontic rehabilitation involves making many interrelated clinical decisions which have an impact on each other. Self-directed computer-based training has been shown to be a very useful tool to develop synthetic and analytical problem-solving skills among students. Thus, a computer-based case study and treatment planning (CSTP) software program was developed which would allow students to work through the process of comprehensive, multidisciplinary treatment planning for patients in a structured and logical manner. The present study was aimed at assessing the effect of this CSTP software on the clinical judgment of dental students while planning prosthodontic rehabilitation and to assess the students’ perceptions about using the program for its intended use. Methods A CSTP software program was developed and validated. The impact of this program on the clinical decision making skills of dental graduates was evaluated by real life patient encounters, using a modified and validated mini-CEX. Students’ perceptions about the program were obtained by a pre-validated feedback questionnaire. Results The faculty assessment scores of clinical judgment improved significantly after the use of this program. The majority of students felt it was an informative, useful, and innovative way of learning and they strongly felt that they had learnt the logical progression of planning, the insight into decision making, and the need for flexibility in treatment planning after using this program. Conclusion CSTP software was well received by the students. There was significant improvement in students’ clinical judgment after using this program. It should thus be envisaged fundamentally as an adjunct to conventional teaching techniques to improve students’ decision making skills and confidence. PMID:25170288

  2. Strategic plan, 1991: A strategy for leadership in space through excellence in space science and applications

    NASA Technical Reports Server (NTRS)

    1991-01-01

    In 1988, the Office of Space Science and Applications (OSSA) developed and published a Strategic Plan for the United States' space science and applications program during the next 5 to 10 years. The Plan presented the proposed OSSA program for the next fiscal year and defined a flexible process that provides the basis for near-term decisions on the allocation of resources and the planning of future efforts. Based on the strategies that have been developed by the advisory committees both of the National Academy of Sciences and of NASA, the Plan balances major, moderate, and small mission initiatives, the utilization of Space Station Freedom, and the requirements for a vital research base. The Plan can be adjusted to accommodate varying budget levels, both those levels that provide opportunities for an expanded science and applications program, and those that constrain growth. SSA's strategic planning is constructed around five actions: establish a set of programmatic themes; establish a set of decision rules; establish a set of priorities for missions and programs within each theme; demonstrate that the strategy can yield a viable program; and check the strategy for consistency with resource constraints. The outcome of this process is a clear, coherent strategy that meets both NASA's and OSSA's goals, that assures realism in long-range planning and advanced technology development, and that provides sufficient resiliency to respond and adapt to both known and unexpected internal and external realities. The OSSA Strategic Plan is revised annually to reflect the approval of new programs, improved understanding of requirements and issues, and any major changes in the circumstances, both within NASA and external to NASA, in which OSSA initiatives are considered.

  3. Space Station - An integrated approach to operational logistics support

    NASA Technical Reports Server (NTRS)

    Hosmer, G. J.

    1986-01-01

    Development of an efficient and cost effective operational logistics system for the Space Station will require logistics planning early in the program's design and development phase. This paper will focus on Integrated Logistics Support (ILS) Program techniques and their application to the Space Station program design, production and deployment phases to assure the development of an effective and cost efficient operational logistics system. The paper will provide the methodology and time-phased programmatic steps required to establish a Space Station ILS Program that will provide an operational logistics system based on planned Space Station program logistics support.

  4. Geospatial Based Information System Development in Public Administration for Sustainable Development and Planning in Urban Environment

    NASA Astrophysics Data System (ADS)

    Kouziokas, Georgios N.

    2016-09-01

    It is generally agreed that the governmental authorities should actively encourage the development of an efficient framework of information and communication technology initiatives so as to advance and promote sustainable development and planning strategies. This paper presents a prototype Information System for public administration which was designed to facilitate public management and decision making for sustainable development and planning. The system was developed by using several programming languages and programming tools and also a Database Management System (DBMS) for storing and managing urban data of many kinds. Furthermore, geographic information systems were incorporated into the system in order to make possible to the authorities to deal with issues of spatial nature such as spatial planning. The developed system provides a technology based management of geospatial information, environmental and crime data of urban environment aiming at improving public decision making and also at contributing to a more efficient sustainable development and planning.

  5. Projecting Program Cost Over an Adequate Time Horizon.

    ERIC Educational Resources Information Center

    Spencer, Milton

    Planning Programming Budgeting Systems involve the introduction of three major operational concepts. First, the development of an analytical capability to examine in depth both agency objectives and the various programs to meet these objectives. Second, the formation of a five-year planning and programming process combined with a sophisticated…

  6. SPECS 2. Component Two: Program Budgeting and Cost Accounting.

    ERIC Educational Resources Information Center

    DuVall, Lloyd A.

    The School Planning, Evaluation, and Communication System (SPECS) is an overall design for districtwide program assessment and development. It is both a way of interrelating planning and evaluation of individual programs and a way of comparing the outcomes of all district programs with the district's community-defined educational goals. Component…

  7. Oncology disease management.

    PubMed

    Fetterolf, Donald E; Terry, Rachel

    2007-02-01

    Oncologic conditions are ubiquitous medical illnesses that present a particular challenge for medical management programs designed to address quality and cost issues in patient populations. Disease management strategies represent a reasonable and effective approach for employers and health plans in their arsenal of health management strategies. Multiple reasons exist for the development of specialized disease management programs that deal with cancer patients, some unique to this group of individuals. Health plans and/or employers have solid justification for addressing these issues directly through programs developed specifically to work with cancer patients. Whether developed within a health plan, or "carved out" to an external vendor, proper evaluation of outcomes is essential.

  8. Space Station Engineering and Technology Development. Proceedings of the Panel on Program Performance and Onboard Mission Control

    NASA Technical Reports Server (NTRS)

    1985-01-01

    An ad-hoc committee was asked to review the following questions relevant to the space station program: (1) onboard maintainability and repair; (2) in-space research and technology program and facility plans; (3) solar thermodynamic research and technology development program planning; (4) program performance (cost estimating, management, and cost avoidance); (5) onboard versus ground-based mission control; and (6) technology development road maps from IOC to the growth station. The objective of these new assignments is to provide NASA with advice on ways and means for improving the content, performance, and/or effectiveness of these elements of the space station program.

  9. Intelligent transportation systems Professional Capacity Building Program : planning and deploying ITS : six white papers describing current and planned programs of five transportation associations and four university ITS Research Centers of Excellence

    DOT National Transportation Integrated Search

    1997-12-01

    In the fall of 1997, the ITS Professional Capacity Building Program initiated the development of six White Papers to briefly describe the current status of, and plans for future education and training activities of six organizations engaged in ...

  10. Environmental development plan for transportation programs: FY80 update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saricks, C.L.; Singh, M.K.; Bernard, M.J. III

    1980-09-01

    This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmentalmore » concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.« less

  11. 7 CFR 22.306 - Financing rural development planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Financing rural development planning. 22.306 Section 22.306 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and... Department of Housing and Urban Development planning and management assistance program or other available...

  12. 24 CFR 91.215 - Strategic plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Strategic plan. 91.215 Section 91.215 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS Local Governments; Contents of...

  13. 24 CFR 91.215 - Strategic plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Strategic plan. 91.215 Section 91.215 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS Local Governments; Contents of...

  14. 24 CFR 91.215 - Strategic plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Strategic plan. 91.215 Section 91.215 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS Local Governments; Contents of...

  15. The Office of Space Science and Applications strategic plan, 1990: A strategy for leadership in space through excellence in space science and applications

    NASA Technical Reports Server (NTRS)

    1990-01-01

    A strategic plan for the U.S. space science and applications program during the next 5 to 10 years was developed and published in 1988. Based on the strategies developed by the advisory committees of both the National Academy of Science and NASA, the plan balances major, moderate, and small mission initiatives, the utilization of the Space Station Freedom, and the requirements for a vital research base. The Office of Space Science and Applications (OSSA) strategic plan is constructed around five actions: establish a set of programmatic themes; establish a set of decision rules; establish a set of priorities for missions and programs within each theme; demonstrate that the strategy will yield a viable program; and check the strategy for consistency within resource constraints. The OSSA plan is revised annually. This OSSA 1990 Strategic Plan refines the 1989 Plan and represents OSSA's initial plan for fulfilling its responsibilities in two major national initiatives. The Plan is now built on interrelated, complementary strategies for the core space science and applications program, for the U.S. Global Change Research Program, and for the Space Exploration Initiative. The challenge is to make sure that the current level of activity is sustained through the end of this century and into the next. The 1990 Plan presents OSSA's strategy to do this.

  16. National ITS Program Plan, Intelligent Transportation Systems Volume II

    DOT National Transportation Integrated Search

    1995-03-01

    THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS, THE FIRST EDITION OF THE PLAN WAS A JOINT EFFORT OF ITS AMERICA AND THE UNITED STATES DEPA...

  17. 7 CFR 371.9 - Policy and Program Development.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... and Program Development. (a) General statement. Policy and Program Development (PPD) provides analytical support for agency decisions and plans. (b) Director of PPD. The Director of PPD is responsible...

  18. 24 CFR 572.200 - Planning grants.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Planning grants. 572.200 Section...) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN....200 Planning grants. Any planning grants made by HUD under the HOPE 3 program will continue to be...

  19. [Diversification is the financial alternative for family planning].

    PubMed

    Castro Villamil, R

    1991-12-01

    During the 1960s, when family planning services were institutionalized in Colombia by PROFAMILIA, abundant foreign assistance was readily available. Few questions were asked about the longterm funding of family planning programs or the need for financial self-sufficiency. The emphasis was on program development without great attention to costs. Beginning around the early 1980s, international donors began to place a higher priority and greater investment in the incipient family planning programs of less developed countries. At present a greater number and higher quality of services are being demanded from PROFAMILIA at the lowest possible cost. Efficiency has replaced efficacy as the overriding goal. PROFAMILIA, due to its excellent results, has lost priority in the eyes of international donors. It has therefore reoriented its financing strategies toward a short, medium, and long term plan to reduce its financial dependence on international donor agencies. Self-sufficiency could be increased through various means, including total government subsidy, charging fees for services and materials sufficient to cover program costs, establishing services and marketing programs aside from family planning programs for the specific purpose of obtaining funds to cover program deficits, or establishing accounting and operational controls to reduce costs through greater efficiency. But large government subsidies are unlikely in a time of budgetary constraints, and raising fees for family planning users would exclude a large number of low-income clients from the family planning program. Cost reduction and implementation of diversified programs should therefore be emphasized for the present. The diversified program should be related to family planning so that use can be made of idle resources. PROFAMILIA has emphasized surgical procedures and medical consultations to utilize clinic facilities more fully and to increase income without increasing fixed costs. In 1990, foreign donations accounted for 47.3% of PROFAMILIA income and PROFAMILIA contributed the rest. 18.1% came from family planning activities, 20.2% from surgical procedures, consultations, sales of medications, and laboratory services, and 20.2% from service contracts, national donations, interest, and other sources. In the same year, family planning programs accounted for 68.9% of expenditures, diversification programs for 11.5%, technical assistance for 8.6%, and administration for 11%. The income and expenditure data indicate that the diversification programs make a significant financial contribution to the family planning program, at the same time reducing dependency on international donor agencies.

  20. E.E.C. 2000: A Study of Environmental Education Centers. Part I and Parts II & III.

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Natural Resources, St. Paul.

    This report of Environmental Education Centers (EECs) presents recommendations development of long range plans for the development and program coordination of EECs in Minnesota. The plan focuses on identifying programming needs, geographic areas to locate facilities, and capital costs for development and creation of a phased-in implementation…

  1. Preparing for High Technology: CAD/CAM Programs. Research & Development Series No. 234.

    ERIC Educational Resources Information Center

    Abram, Robert; And Others

    This guide is one of three developed to provide information and resources to assist in planning and developing postsecondary technican training programs in high technology areas. It is specifically intended for vocational-technical educators and planners in the initial stages of planning a specialized training option in computer-aided design (CAD)…

  2. Pecan Research and Outreach in New Mexico: Logic Model Development and Change in Communication Paradigms

    ERIC Educational Resources Information Center

    Sammis, Theodore W.; Shukla, Manoj K.; Mexal, John G.; Wang, Junming; Miller, David R.

    2013-01-01

    Universities develop strategic planning documents, and as part of that planning process, logic models are developed for specific programs within the university. This article examines the long-standing pecan program at New Mexico State University and the deficiencies and successes in the evolution of its logic model. The university's agricultural…

  3. Advanced space program studies. Overall executive summary

    NASA Technical Reports Server (NTRS)

    Wolfe, M. G.

    1977-01-01

    NASA and DoD requirements and planning data were used in multidiscipline advanced planning investigations of space operations and associated elements (including man), identification of potential low cost approaches, vehicle design, cost synthesis techniques, technology forecasting and opportunities for DoD technology transfer, and the development near-, mid-, and far-term space initiatives and development plans with emphasis on domestic and military commonality. An overview of objectives and results are presented for the following studies: advanced space planning and conceptual analysis, shuttle users, technology assessment and new opportunities, standardization and program practice, integrated STS operations planning, solid spinning upper stage, and integrated planning support functions.

  4. 7 CFR 1948.53 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... program. (l) Growth management planning. Planning for the orderly development of an approved designated... services needed; overall plans for the coordinated development of all approved designated areas within a... identification of: housing sites; housing site development needs; data and resource needs; funding needs...

  5. 7 CFR 1948.53 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... program. (l) Growth management planning. Planning for the orderly development of an approved designated... services needed; overall plans for the coordinated development of all approved designated areas within a... identification of: housing sites; housing site development needs; data and resource needs; funding needs...

  6. 7 CFR 1948.53 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... program. (l) Growth management planning. Planning for the orderly development of an approved designated... services needed; overall plans for the coordinated development of all approved designated areas within a... identification of: housing sites; housing site development needs; data and resource needs; funding needs...

  7. PLANNING, PROGRAMMING, DESIGNING THE COMMUNITY COLLEGE, PROCEEDINGS OF A CONFERENCE SPONSORED BY THE COLLEGE OF ARCHITECTURE AND URBAN PLANNING AND THE CENTER FOR THE DEVELOPMENT OF COMMUNITY COLLEGE EDUCATION (UNIVERSITY OF WASHINGTON, APRIL 24-25, 1967).

    ERIC Educational Resources Information Center

    SONDALLE, MARVIN P.

    PARTICIPANTS AT THIS CONFERENCE DEFINED THE ESSENTIAL MAJOR STEPS IN FACILITY PLANNING FOR A NEW CAMPUS AS SITE SELECTION, FINANCIAL PROGRAMMING, CAMPUS PLANNING, AND CONSTRUCTION. THEY ALSO AGREED THAT THE COLLEGE ADMINISTRATION AND THE ARCHITECTURAL STAFF MUST WORK TOGETHER AT EVERY STAGE OF THE PROGRAM. PRESENT TECHNIQUES OF ENROLLMENT…

  8. FY 2011 Educational Facilities Master Plan & the FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2010

    2010-01-01

    The FY 2011 Educational Facilities Master Plan (Master Plan) and FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  9. Programs for road network planning.

    Treesearch

    Ward W. Carson; Dennis P. Dykstra

    1978-01-01

    This paper describes four computer programs developed to assist logging engineers to plan transportation in a forest. The objective of these programs, to be used together, is to find the shortest path through a transportation network from a point of departure to a destination. Three of the programs use the digitizing and plotting capabilities of a programable desk-top...

  10. International Photovoltaic Program Plan. Volume II. Appendices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Costello, D.; Koontz, R.; Posner, D.

    1979-12-01

    This second volume of a two-part report on the International Photovoltaic Program Plan contains appendices summarizing the results of analyses conducted in preparation of the plan. These analyses include compilations of relevant statutes and existing Federal programs; strategies designed to expand the use of photovoltaics abroad; information on the domestic photovoltaic plan and its impact on the proposed international plan; perspectives on foreign competition; industry views on the international photovoltaic market and ideas about how US government actions could affect this market; international financing issues; and information on issues affecting foreign policy and developing countries.

  11. Engaging partners to initiate evaluation efforts: tactics used and lessons learned from the prevention research centers program.

    PubMed

    Wright, Demia Sundra; Anderson, Lynda A; Brownson, Ross C; Gwaltney, Margaret K; Scherer, Jennifer; Cross, Alan W; Goodman, Robert M; Schwartz, Randy; Sims, Tom; White, Carol R

    2008-01-01

    The Centers for Disease Control and Prevention's (CDC's) Prevention Research Centers (PRC) Program underwent a 2-year evaluation planning project using a participatory process that allowed perspectives from the national community of PRC partners to be expressed and reflected in a national logic model. The PRC Program recognized the challenge in developing a feasible, useable, and relevant evaluation process for a large, diverse program. To address the challenge, participatory and utilization-focused evaluation models were used. Four tactics guided the evaluation planning process: 1) assessing stakeholders' communication needs and existing communication mechanisms and infrastructure; 2) using existing mechanisms and establishing others as needed to inform, educate, and request feedback; 3) listening to and using feedback received; and 4) obtaining adequate resources and building flexibility into the project plan to support multifaceted mechanisms for data collection. Participatory methods resulted in buy-in from stakeholders and the development of a national logic model. Benefits included CDC's use of the logic model for program planning and development of a national evaluation protocol and increased expectations among PRC partners for involvement. Challenges included the time, effort, and investment of program resources required for the participatory approach and the identification of whom to engage and when to engage them for feedback on project decisions. By using a participatory and utilization-focused model, program partners positively influenced how CDC developed an evaluation plan. The tactics we used can guide the involvement of program stakeholders and help with decisions on appropriate methods and approaches for engaging partners.

  12. Educational planning for utilization of space shuttle (ED-PLUSS). Executive summary: Identification and evaluation of educational uses and users for the STS

    NASA Technical Reports Server (NTRS)

    Engle, H. A.; Christensen, D. L.

    1975-01-01

    The development and application of educational programs to improve public awareness of the space shuttle/space lab capabilities are reported. Special efforts were made to: identify the potential user, identify and analyze space education programs, plan methods for user involvement, develop techniques and programs to encourage new users, and compile follow-on ideas.

  13. Fuels planning: science synthesis and integration; social issues fact sheet 01: Developing personal responsibility for fuels reduction: Building a successful program to engage property owners

    Treesearch

    Rocky Mountain Research Station USDA Forest Service

    2004-01-01

    In the course of work as a land manager, you will no doubt be involved in developing programs to achieve various objectives, including the improvement of fuels management on private lands. This fact sheet describes six steps that will help you plan and conduct a successful program.

  14. 24 CFR 91.235 - Special case; abbreviated consolidated plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Special case; abbreviated consolidated plan. 91.235 Section 91.235 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS...

  15. 24 CFR 91.235 - Special case; abbreviated consolidated plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Special case; abbreviated consolidated plan. 91.235 Section 91.235 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS...

  16. 24 CFR 91.235 - Special case; abbreviated consolidated plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Special case; abbreviated consolidated plan. 91.235 Section 91.235 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS...

  17. 24 CFR 91.235 - Special case; abbreviated consolidated plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Special case; abbreviated consolidated plan. 91.235 Section 91.235 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS...

  18. 24 CFR 91.235 - Special case; abbreviated consolidated plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Special case; abbreviated consolidated plan. 91.235 Section 91.235 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS...

  19. Cool & Connected

    EPA Pesticide Factsheets

    The Cool & Connected planning assistance program helps communities develop strategies and an action plan for using broadband to promote environmentally and economically sustainable community development.

  20. Guide Lines for Evaluation of Continuing Education Programs in Mental Health.

    ERIC Educational Resources Information Center

    Miller, Norma; And Others

    Suggestions for program administrators and training program directors to develop comprehensive plans based on principles of community involvement, education, administration and finance, and the disciplines being taught are broadly outlined. Three accompanying charts illustrate approach to evaluation planning. (NF)

  1. 78 FR 79477 - Announcement of Funding Awards, Choice Neighborhoods Grant Program, Fiscal Year 2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-30

    ... to community development centered on housing transformation. The program aims to transform...-functioning services, effective schools and education programs, public assets, public transportation, and... comprehensive neighborhood revitalization strategy, or Transformation Plan. The Transformation Plan will become...

  2. Definition study of a Variable Cycle Experimental Engine (VCEE) and associated test program and test plan

    NASA Technical Reports Server (NTRS)

    Allan, R. D.

    1978-01-01

    The Definition Study of a Variable Cycle Experimental Engine (VCEE) and Associated Test Program and Test Plan, was initiated to identify the most cost effective program for a follow-on to the AST Test Bed Program. The VCEE Study defined various subscale VCE's based on different available core engine components, and a full scale VCEE utilizing current technology. The cycles were selected, preliminary design accomplished and program plans and engineering costs developed for several program options. In addition to the VCEE program plans and options, a limited effort was applied to identifying programs that could logically be accomplished on the AST Test Bed Program VCE to extend the usefulness of this test hardware. Component programs were provided that could be accomplished prior to the start of a VCEE program.

  3. 77 FR 41164 - Joint Subcommittee on Aquaculture Research and Development Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-12

    ... Development Strategic Plan AGENCIES: Agricultural Research Service (ARS), U.S. Department of Agriculture (USDA... Agricultural Research Service (USDA-ARS) announce on behalf of the Federal Interagency Working Group on... http://www.ars.usda.gov/research/programs/programs.htm?np_code=106&docid=22641 . DATES: Written...

  4. State Appalachian Development Plans and Investment Programs for Fiscal Year 1979. Abstracts.

    ERIC Educational Resources Information Center

    1979

    One component of the Appalachian Regional Commission's regional plan process is the annual review and approval of individual state development policies. The state summaries of proposed programs for fiscal year 1979 (for Alabama, Georgia, Kentucky, Maryland, Mississippi, New York, North Carolina, Ohio, Pennsylvania, South Carolina, Tennessee,…

  5. The CCC Institutional Development Program: Organizational Change from the Chief Executive's Perspective.

    ERIC Educational Resources Information Center

    Ellison, Nolen M.; Eadie, Douglas C.

    Cuyahoga Community College's three-phase Institutional Development Program (IDP) was established in January, 1975, to provide systematic and uniform college-wide planning and management procedures. This report first discusses the social forces which led the college to undertake the IDP; identifies the long-range planning, governance, and…

  6. DEVELOPMENT OF A CORE COMBUSTION RESEARCH PROGRAM PLAN FOR EPA

    EPA Science Inventory

    The report described a plan, evolving from a review of the state- of-the-art in combustion research, for a long- term research program in combustion and thermal destruction. trawman plan was prepared and reviewed by a panel of representatives from industry, academia, and governme...

  7. Dental manpower planning in the Indian Health Service.

    PubMed

    Collins, R J; Broderick, E B; Herman, D J

    1993-01-01

    As a public health agency, the Indian Health Service (IHS) must plan for the needs of the entire American Indian and Alaskan Native (AI/AN) population and distribute resources as equitably as possible. To facilitate this process, the IHS has developed a manpower planning model to provide for the distribution of dental providers based upon the dental needs of the AI/AN population and within the limits of annual appropriations of funds. This paper briefly describes the original IHS Dental Program manpower planning model and the development of modifications over time. The need-based approach to manpower planning developed by the IHS Dental Program has exhibited utility and flexibility over time. It allows a determination of clinic size (number of operatories) and dental staffing requirements, and may be generalizable to other public health programs if an accurate assessment of utilization rate and treatment need can be made for the defined population. Nonetheless, the availability of resources in public programs is subject to the compromises inherent in the political process; thus, the use of a manpower planning model alone may not be sufficient to ensure the equitable distribution of dental resources and dental providers.

  8. 24 CFR 91.5 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS General § 91.5 Definitions. The terms..., community development plan, and submissions for funding under any of the Community Planning and Development... domestic violence, youth, and persons with HIV/AIDS. Jurisdiction. A State or unit of general local...

  9. 25 CFR 170.400 - What is the purpose of transportation planning?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... address current and future land use, economic development, traffic demand, public safety, health, and...

  10. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Programmore » projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.« less

  11. A Preservation Program for the Colorado State University Libraries. The Final Report of the ARL/OMS Preservation Planning Program.

    ERIC Educational Resources Information Center

    Green, Stephen; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Colorado State University Library (CSUL) working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). Designed to put self-help tools into the hands of library staff responsible for developing plans and procedures…

  12. A Supplement to the Component Four Implementation Booklet. Broad Goal Definition in Emerald School District. SPECS: School Planning, Evaluation, and Communication System.

    ERIC Educational Resources Information Center

    Nagle, John M.; Walker, Harold E.

    The School Planning, Evaluation, and Communication System (SPECS) is an overall design for districtwide program assessment and development. It is both a way of interrelating planning and evaluation of individual programs and a way of comparing the outcomes of all district programs with the district's community-defined educational goals. This…

  13. 7 CFR 23.9 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... development programs and policies. (d) Regional Programs will be consonant with all rural development... Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK Regional Program § 23.9 General. (a... “Regional Programs.” (b) The Regional Programs shall develop and provide knowledge essential to assist and...

  14. How economic development and family planning programs combined to reduce Indonesian fertility.

    PubMed

    Gertler, P J; Molyneaux, J W

    1994-02-01

    This paper examines the contributions of family planning programs, economic development, and women's status to Indonesian fertility decline from 1982 to 1987. Methodologically we unify seemingly conflicting demographic and economic frameworks into a single "structural" proximate-cause model as well as controlling statistically for the targeted (nonrandom) placement of family planning program inputs. The results are consistent with both frameworks: 75% of the fertility decline resulted from increased contraceptive use, but was induced primarily through economic development and improved education and economic opportunities for females. Even so, the dramatic impact of the changes in demand-side factors (education and economic development) on contraceptive use was possible only because there already existed a highly responsive contraceptive supply delivery system.

  15. Summer Splash. 1988 Wisconsin Summer Library Program Manual. Bulletin No. 8230.

    ERIC Educational Resources Information Center

    Lamb, Donald K.; And Others

    A compilation of materials contributed by and developed with the cooperation of Wisconsin librarians and Ohio's 1987 summer reading program, this planning manual provides guidelines for planning and promoting summer programs for young people by librarians in the state of Wisconsin. The theme of the program, "Summer Splash," is intended…

  16. Very Low-Cost Nutritious Diet Plans Designed by Linear Programming.

    ERIC Educational Resources Information Center

    Foytik, Jerry

    1981-01-01

    Provides procedural details of Linear Programing, developed by the U.S. Department of Agriculture to devise a dietary guide for consumers that minimizes food costs without sacrificing nutritional quality. Compares Linear Programming with the Thrifty Food Plan, which has been a basis for allocating coupons under the Food Stamp Program. (CS)

  17. Advanced composites wing study program, volume 2

    NASA Technical Reports Server (NTRS)

    Harvey, S. T.; Michaelson, G. L.

    1978-01-01

    The study on utilization of advanced composites in commercial aircraft wing structures was conducted as a part of the NASA Aircraft Energy Efficiency Program to establish, by the mid-1980s, the technology for the design of a subsonic commercial transport aircraft leading to a 40% fuel savings. The study objective was to develop a plan to define the effort needed to support a production commitment for the extensive use of composite materials in wings of new generation aircraft that will enter service in the 1985-1990 time period. Identification and analysis of what was needed to meet the above plan requirements resulted in a program plan consisting of three key development areas: (1) technology development; (2) production capability development; and (3) integration and validation by designing, building, and testing major development hardware.

  18. 44 CFR 78.5 - Flood Mitigation Plan development.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  19. 44 CFR 78.5 - Flood Mitigation Plan development.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  20. 44 CFR 78.5 - Flood Mitigation Plan development.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  1. 76 FR 20364 - Notice of Proposed Information Collection: Comment Request; Technical Assistance for Community...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... Information Collection: Comment Request; Technical Assistance for Community Planning and Development Programs AGENCY: Office of the Assistant Secretary for Community Planning And Development, HUD. ACTION: Notice... Community Planning and Development, Department of Housing Urban and Development, 451 7th Street, SW., Room...

  2. [Thinking about several problems of the research of our family planning strategy].

    PubMed

    Shi, H

    1989-03-01

    On the basis of 1982 census data, it is estimated that from 1987-1997 13 million women will enter the age of marriage and child-bearing each year. The tasks of keeping the population size around 1.2 billion by the year 2000 is arduous. Great efforts have to be made to continue encouraging one child/couple, and to pursue the current plans and policies and maintain strict control over fertility. Keeping population growth in pace with economic growth, environment, ecological balance, availability of per capita resources, education programs, employment capability, health services, maternal and child care, social welfare and social security should be a component of the long term development strategy of the country. Family planning is a comprehensive program which involves long cycles and complicated factors, viewpoints of expediency in guiding policy and program formulation for short term benefits are inappropriate. The emphasis of family planning program strategy should be placed on the rural areas where the majority of population reside. Specifically, the major aspects of strategic thrusts should be the linkage between policy implementation and reception, between family planning publicity and changes of ideation on fertility; the integrated urban and rural program management relating to migration and differentiation of policy towards minority population and areas in different economic development stages. In order to achieve the above strategies, several measures are proposed. (1) strengthening family planning program and organization structure; (2) providing information on population and contraception; (3) establishing family planning program network for infiltration effects; (4) using government financing, taxation, loan, social welfare and penalty to regulate fertility motivations; (5) improving the system of target allocation and data reporting to facilitate program implementation; (6) strengthening population projection and policy research; (7) and strengthening training of family planning personnel to improve program efficiency.

  3. Supporting adherence and healthy lifestyles in leg ulcer patients: systematic development of the Lively Legs program for dermatology outpatient clinics.

    PubMed

    Heinen, Maud M; Bartholomew, L Kay; Wensing, Michel; van de Kerkhof, Peter; van Achterberg, Theo

    2006-05-01

    The objective of our project was to develop a lifestyle program for leg ulcer patients at outpatient clinics for dermatology. We used the intervention-mapping (IM) framework for systematically developing theory and evidence based health promotion programs. We started with a needs-assessment. A multidisciplinary project group of health care workers and patients was involved in all five IM steps; formulating proximal program objectives, selecting methods and strategies, producing program components, planning for adoption and implementation and planning for evaluation. Several systematic literature reviews and original studies were performed to support this process. Social Cognitive Theory was selected as the main theory behind the program 'Lively Legs' and was combined with elements of Goal-Setting Theory, the precaution adoption model and motivational interviewing. The program is conducted through health counseling by dermatology nurses and was successfully pre-tested. Also, an implementation and evaluation plan were made. Intervention mapping helped us to succeed in developing a lifestyle program with clear goals and methods, operational strategies and materials and clear procedures. Coaching leg ulcer patients towards adherence with compression therapy and healthy lifestyles should be taken on without delay. Systematic development of lifestyle programs for other patient groups should be encouraged.

  4. Engineering Technology Programs. Preliminary Curriculum Planning Guide.

    ERIC Educational Resources Information Center

    Center for Occupational Research and Development, Inc., Waco, TX.

    Developed as a resource to assist in a major revision underway in Georgia area technical schools to change curricula for preparing engineering technicians, this preliminary program-planning guide describes curriculum structures for specialized programs in three major areas--electronics, electromechanics, and mechanics. The handbook, which is…

  5. Retirement Planning Program.

    ERIC Educational Resources Information Center

    Edison State Community Coll., Piqua, OH.

    This curriculum guide was developed for use in Edison State Community College's (ESCC's) Community Pre-Retirement Training Program. The first of the guide's seven modules provides a brief look at retirement, retirement planning, and the ESCC program. The second module focuses on relationships, considering issues such as communication, finances,…

  6. California Community College Family and Consumer Sciences Program Plan, 1996. Including: Directory of Professional and Trade Organizations, Directory of Family and Consumer Sciences and Related Program Areas and Program Coordinators.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    Intended as a resource for California community colleges and districts in assessing and improving family and consumer science (FCS) programs, this program plan provides information on current trends affecting the delivery of FCS programs and guidelines for assessing and developing new comprehensive or specialized programs. Following letters of…

  7. MASS TRANSIT: FTA Could Relieve New Starts Program Funding Constraints

    DTIC Science & Technology

    2001-08-01

    progress through a local or regional review of alternatives, develop preliminary engineering plans , and obtain FTA’s approval for final design.7 TEA-21...and transit programs can also be used to develop, plan , and/or construct these projects. 7The alternatives analysis stage provides information on the...include right-of-way acquisition, utility relocation, and the preparation of final construction plans and cost estimates. Background Page 5 GAO-01-987 New

  8. SRDC Plan of Work: Southern States' Title V Programs, 1978. SRDC Series Publication No. 24.

    ERIC Educational Resources Information Center

    Southern Rural Development Center, State College, MS.

    Moving rural development program and research information to users summarizes the Southern Rural Development Center (SRDC) Plan of Work for 1978. One of 4 regional centers set up by the 1972 Rural Development Act, SRDC coordinates cooperation between research and extension at 28 land-grant institutions in 13 states and Puerto Rico which have rural…

  9. An Academic Development Plan for the Island of Molokai in Hawaii, 1990-1996.

    ERIC Educational Resources Information Center

    Pezzoli, J. A.

    Since 1970, Maui Community College (MCC) has offered credit courses on the island of Molokai, with the program expanding considerably in 1986 with the inception of the MCC-Molokai Center. Developed to project a more stable and comprehensive program for the residents of Molokai, this academic development plan outlines the priorities of MCC on the…

  10. SRDC Plan of Work - Southern States' Title V Programs. SRDC Series Publication No. 22, June 1977.

    ERIC Educational Resources Information Center

    Southern Rural Development Center, State College, MS.

    The Southern Rural Development Center's 1977 plan focuses on ways to move rural development program and research information to the users. One of four regional centers set by the 1972 Rural Development Act, the southern center works with research and extension staffs in 27 land-grant institutions in 13 states and Puerto Rico. Its publication…

  11. 77 FR 75442 - Land Buy-Back Program for Tribal Nations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-20

    ... Department expects to continually update its plans to reflect tribal feedback, lessons learned, and best... of 2011, the Department issued a draft plan dated January 2012. The Department has developed this Initial Implementation Plan for the Land Buy-Back Program for Tribal Nations incorporating input received...

  12. Montana Statewide Outdoor Recreation Plan: Action Program.

    ERIC Educational Resources Information Center

    Montana State Fish and Game Commission, Helena.

    The current revision of Montana's Statewide Outdoor Recreation Plan allows for utilizing the state's outdoor recreational resources to the best advantage of present and future generations. In developing the action program, consideration has been given to preservation, protection, and enhancement of the natural environment. The plan has also been…

  13. FY 2013 Educational Facilities Master Plan and the FY 2013-2018 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2012

    2012-01-01

    The FY 2013 Educational Facilities Master Plan (Master Plan) and the FY 2013-2018 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of…

  14. FY 2012 Educational Facilities Master Plan and the Amended FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2011

    2011-01-01

    The FY 2012 Educational Facilities Master Plan (Master Plan) and Amendments to the FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the…

  15. FY 2007 Educational Facilities Master Plan and the FY 2007-2012 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2006

    2006-01-01

    The FY 2007 Educational Facilities Master Plan (Master Plan) and FY 2007-2012 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  16. An effectiveness monitoring program for the northwest forest plan: new approaches to common monitoring problems

    Treesearch

    Craig Palmer; Barry Mulder; Barry Noon

    2000-01-01

    The Northwest Forest Plan is a large-scale ecosystem management plan for federal lands in the Pacific Northwest of the United States. An effectiveness monitoring program has been developed to determine the extent to which the goals and objectives of this Plan are being achieved. Priority resources identified for ecological monitoring include late-successional and old-...

  17. Challenging the Future - Journey to Excellence. Aeropropulsion strategic plan for the 1990's

    NASA Astrophysics Data System (ADS)

    Over the past several months, the Lewis Aeropropulsion Management Council (AMC) has conducted a critical assessment of its strategic plan. This assessment clearly indicated a need for change, both in the aeropropulsion program emphasis and in the approach to carrying out that program. Customers sent a strong message that the program must improve the timeliness of research and technology products and services and must work more closely with them to develop and transfer new technology. The strategic plan defines AMC's vision for the future and underlying organizational values. It contains a set of broad strategies and actions that point the way toward achieving the goals of customer satisfaction, organizational effectiveness, and programmatic excellence. Those strategies are expected to form the basis for the development of specific tactical plans by Lewis aeropropulsion thrust teams, divisions, and branches. To guide tactical planning of the aeropropulsion program, this strategic plan outlines the agency's strategic directions and long-range aeronautics goals, the aeropropulsion goals and key objectives for achieving them, projections of Lewis aeropropulsion budgets, planned allocations of resources, and the processes that will be used to measure success in carrying out the strategic plan.

  18. Challenging the Future - Journey to Excellence. Aeropropulsion strategic plan for the 1990's

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Over the past several months, the Lewis Aeropropulsion Management Council (AMC) has conducted a critical assessment of its strategic plan. This assessment clearly indicated a need for change, both in the aeropropulsion program emphasis and in the approach to carrying out that program. Customers sent a strong message that the program must improve the timeliness of research and technology products and services and must work more closely with them to develop and transfer new technology. The strategic plan defines AMC's vision for the future and underlying organizational values. It contains a set of broad strategies and actions that point the way toward achieving the goals of customer satisfaction, organizational effectiveness, and programmatic excellence. Those strategies are expected to form the basis for the development of specific tactical plans by Lewis aeropropulsion thrust teams, divisions, and branches. To guide tactical planning of the aeropropulsion program, this strategic plan outlines the agency's strategic directions and long-range aeronautics goals, the aeropropulsion goals and key objectives for achieving them, projections of Lewis aeropropulsion budgets, planned allocations of resources, and the processes that will be used to measure success in carrying out the strategic plan.

  19. DOE-NE Proliferation and Terrorism Risk Assessment: FY12 Plans Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sadasivan, Pratap

    2012-06-21

    This presentation provides background information on FY12 plans for the DOE Office of Nuclear Energy Proliferation and Terrorism Risk Assessment program. Program plans, organization, and individual project elements are described. Research objectives are: (1) Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of current reactors; (2) Develop improvements in the affordability of new reactors to enable nuclear energy; (3) Develop Sustainable Nuclear Fuel Cycles; and (4) Understand and minimize the risks of nuclear proliferation and terrorism - Goal is to enable the use of risk information to inform NE R&D programmore » planning.« less

  20. Developing a Parent-Centered Obesity Prevention Program for 4-H Families: Implications for Extension Family Programming

    ERIC Educational Resources Information Center

    Benke, Carrie J.; Bailey, Sandra J.; Martz, Jill; Paul, Lynn; Lynch, Wesley; Eldridge, Galen

    2013-01-01

    Planning youth and family programming in the 21st century is daunting given family members' busy schedules. This is even more challenging when planning programs in rural areas, where there are vast distances between communities. This article discusses a research and educational outreach project that uses best practices in program development…

  1. A Plan for Developing a Program of Adult Education to Meet the Needs of a Local Community.

    ERIC Educational Resources Information Center

    Smith, Harold K.

    Using local and national data, this study examined adult education program offerings in East Orange, New Jersey, potential participants' needs and interests, and program needs reported by business and industrial leaders. A plan was proposed for an appropriate community wide program. Data from public school adult education programs in 142 cities…

  2. 25 CFR 20.511 - Should permanency plans be developed?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ....511 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR HUMAN SERVICES FINANCIAL ASSISTANCE AND SOCIAL SERVICES PROGRAMS Child Assistance Foster Care § 20.511 Should permanency plans be developed? Permanency planning must be developed for all child placements within 6 months after initial...

  3. MCPS Curriculum Development Planning Process.

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, Rockville, MD. Dept. of Instructional Planning and Development.

    The procedure documented is used for the systemwide planning of curriculum development in Montgomery County, Maryland, and consists of three parts: a planning and review process; an instructional design and development model; and a proposed calendar for cyclical review of programs. Specific position responsibilities, organizational charts, and…

  4. Multiyear Program Plan for the High Temperature Materials Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arvid E. Pasto

    2000-03-17

    Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly,more » the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO{sub x} and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required.« less

  5. Developing Service Plans: A Resource Manual for American Indian/Alaska Native Head Start/Early Head Start Grantees

    ERIC Educational Resources Information Center

    Academy for Educational Development, 2006

    2006-01-01

    This "Developing Service Plans" guide is a tool to assist grantees in the development of written service plans. It provides a structure that can be tailored to meet the needs of individual grantees. Services Plans are a management tool for planning, organizing and implementing Head Start program services to children and families. As stated in the…

  6. U.S. Climate Change Science Program. Vision for the Program and Highlights of the Scientific Strategic Plan

    NASA Technical Reports Server (NTRS)

    2003-01-01

    The vision document provides an overview of the Climate Change Science Program (CCSP) long-term strategic plan to enhance scientific understanding of global climate change.This document is a companion to the comprehensive Strategic Plan for the Climate Change Science Program. The report responds to the Presidents direction that climate change research activities be accelerated to provide the best possible scientific information to support public discussion and decisionmaking on climate-related issues.The plan also responds to Section 104 of the Global Change Research Act of 1990, which mandates the development and periodic updating of a long-term national global change research plan coordinated through the National Science and Technology Council.This is the first comprehensive update of a strategic plan for U.S. global change and climate change research since the origal plan for the U.S. Global Change Research Program was adopted at the inception of the program in 1989.

  7. Continuing Education for the Personnel of Small Public Libraries: Program Development at the Iowa State University Library and Its Public Services Course. Iowa State University Library Series in Continuing Education, no. 2.

    ERIC Educational Resources Information Center

    Shonrock, Diana D.

    This report describes the planning, implementation, and evaluation of a coordinated staff development program to offer certified, non-degree credit to non-professional librarians from small public libraries. The program plan includes a course consisting of five 3-hour sessions covering the reference interview; interlibrary loan, government…

  8. Agent planning in AgScala

    NASA Astrophysics Data System (ADS)

    Tošić, Saša; Mitrović, Dejan; Ivanović, Mirjana

    2013-10-01

    Agent-oriented programming languages are designed to simplify the development of software agents, especially those that exhibit complex, intelligent behavior. This paper presents recent improvements of AgScala, an agent-oriented programming language based on Scala. AgScala includes declarative constructs for managing beliefs, actions and goals of intelligent agents. Combined with object-oriented and functional programming paradigms offered by Scala, it aims to be an efficient framework for developing both purely reactive, and more complex, deliberate agents. Instead of the Prolog back-end used initially, the new version of AgScala relies on Agent Planning Package, a more advanced system for automated planning and reasoning.

  9. Advanced rural transportation systems (ARTS) : strategic plan

    DOT National Transportation Integrated Search

    1997-08-01

    This Strategic Plan has been developed for the Advanced Rural Transportation Systems (ARTS) portion of the ITS Program. The plan focuses on the Federal Government's role in developing rural ITS options and prudently managing emerging ITS technologies...

  10. 45 CFR 1321.23 - Notification of State plan or State plan amendment approval.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON AGING, OLDER AMERICANS PROGRAMS GRANTS TO STATE AND COMMUNITY PROGRAMS ON AGING State Agency Responsibilities...

  11. 45 CFR 1321.23 - Notification of State plan or State plan amendment approval.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON AGING, OLDER AMERICANS PROGRAMS GRANTS TO STATE AND COMMUNITY PROGRAMS ON AGING State Agency Responsibilities...

  12. 45 CFR 1321.23 - Notification of State plan or State plan amendment approval.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON AGING, OLDER AMERICANS PROGRAMS GRANTS TO STATE AND COMMUNITY PROGRAMS ON AGING State Agency Responsibilities...

  13. 45 CFR 1321.23 - Notification of State plan or State plan amendment approval.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON AGING, OLDER AMERICANS PROGRAMS GRANTS TO STATE AND COMMUNITY PROGRAMS ON AGING State Agency Responsibilities...

  14. Space Solar Power Program. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arif, Humayun; Barbosa, Hugo; Bardet, Christophe

    1992-08-01

    Information pertaining to the Space Solar Power Program is presented on energy analysis; markets; overall development plan; organizational plan; environmental and safety issues; power systems; space transportation; space manufacturing, construction, operations; design examples; and finance.

  15. Setting up an Asbestos Operations and Maintenance (O&M) Program

    EPA Pesticide Factsheets

    Covers steps a buidling's O&M plan should including: appointing an asbestos program manager, inspecting the building, developing a plan, and if necessary selecting and implementing larger repair or abatement projects.

  16. Development of an imaging-planning program for screen/film and computed radiography mammography for breasts with short chest wall to nipple distance.

    PubMed

    Dong, S L; Su, J L; Yeh, Y H; Chu, T C; Lin, Y C; Chuang, K S

    2011-04-01

    Imaging breasts with a short chest wall to nipple distance (CWND) using a traditional mammographic X-ray unit is a technical challenge for mammographers. The purpose of this study is the development of an imaging-planning program to assist in determination of imaging parameters of screen/film (SF) and computed radiography (CR) mammography for short CWND breasts. A traditional mammographic X-ray unit (Mammomat 3000, Siemens, Munich, Germany) was employed. The imaging-planning program was developed by combining the compressed breast thickness correction, the equivalent polymethylmethacrylate thickness assessment for breasts and the tube loading (mAs) measurement. Both phantom exposures and a total of 597 exposures were used for examining the imaging-planning program. Results of the phantom study show that the tube loading rapidly decreased with the CWND when the automatic exposure control (AEC) detector was not fully covered by the phantom. For patient exposures with the AEC fully covered by breast tissue, the average fractional tube loadings, defined as the ratio of the predicted mAs using the imaging-planning program and mAs of the mammogram, were 1.10 and 1.07 for SF and CR mammograms, respectively. The predicted mAs values were comparable to the mAs values, as determined by the AEC. By applying the imaging-planning program in clinical practice, the experiential dependence of the mammographer for determination of the imaging parameters for short CWND breasts is minimised.

  17. Integrated propulsion technology demonstrator. Program plan

    NASA Technical Reports Server (NTRS)

    1994-01-01

    NASA and Rockwell have embarked on a cooperative agreement to define, develop, fabricate, and operate an integrated propulsion technology demonstrator (IPTD) for the purpose of validating design, process, and technology improvements of launch vehicle propulsion systems. This program, a result of NRA8-11, Task Area 1 A, is jointly funded by both NASA and Rockwell and is sponsored by the Reusable Launch Vehicle office at NASA Marshall Space flight Center. This program plan provides to the joint NASA/Rockwell integrated propulsion technology demonstrator (IPTD) team a description of the activities within tasks / sub tasks and associated schedules required to successfully achieve program objectives. This document also defines the cost elements and manpower allocations for each sub task for purpose of program control. This plan is updated periodically by developing greater depth of direction for outyear tasks as the program matures. Updating is accomplished by adding revisions to existing pages or attaching page revisions to this plan. In either case, revisions will be identified by appropriate highlighting of the change, or specifying a revision page through the use of footnotes on the bottom right of each change page. Authorization for the change is provided by the principal investigators to maintain control of this program plan document and IPTD program activities.

  18. A Roadmap for using Agile Development in a Traditional System

    NASA Technical Reports Server (NTRS)

    Streiffert, Barbara; Starbird, Thomas

    2006-01-01

    I. Ensemble Development Group: a) Produces activity planning software for in spacecraft; b) Built on Eclipse Rich Client Platform (open source development and runtime software); c) Funded by multiple sources including the Mars Technology Program; d) Incorporated the use of Agile Development. II. Next Generation Uplink Planning System: a) Researches the Activity Planning and Sequencing Subsystem for Mars Science Laboratory (APSS); b) APSS includes Ensemble, Activity Modeling, Constraint Checking, Command Editing and Sequencing tools plus other uplink generation utilities; c) Funded by the Mars Technology Program; d) Integrates all of the tools for APSS.

  19. 77 FR 71573 - Notice of Request for Extension of a Currently Approved Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-03

    ... Housing and Community Programs, Business and Cooperative Programs, Utility Programs, to request an... planning and performing construction and other development work. DATES: Comments on this notice must be... [email protected] . SUPPLEMENTARY INFORMATION: Title: RD 1924-A, ``Planning and Performing...

  20. Sexual Abuse Prevention Project for Deaf/Hard of Hearing Children.

    ERIC Educational Resources Information Center

    ACEHI Journal, 1990

    1990-01-01

    The Sexual Abuse Prevention Program for Deaf Children, a program of the Greater Vancouver Association of the Deaf in British Columbia (Canada), plans to conduct a needs assessment of children ages 8-15 in the Alberta, British Columbia, and Yukon regions; develop prevention resources; and develop a comprehensive national distribution plan for the…

  1. Drug Abuse Assessment, Program Planning and Resource Development in the Black Community.

    ERIC Educational Resources Information Center

    Gunn, Karen S.

    This paper presents a needs assessment project developed to establish drug-related services in a small black community. A literature review reveals the influence of social issues relevant to the population on research methodology, program planning, and social action. The convergent analysis approach used in the needs assessment is explained and…

  2. International Academy of Astronautics 5th cosmic study—preparing for a 21st century program of integrated, Lunar and Martian exploration and development (executive summary)

    NASA Astrophysics Data System (ADS)

    Koelle, H. H.; Stephenson, D. G.

    2003-04-01

    This report is an initial review of plans for a extensive program to survey and develop the Moon and to explore the planet Mars during the 21st century. It presents current typical plans for separate, associated and fully integrated programs of Lunar and Martian research, exploration and development, and concludes that detailed integrated plans must be prepared and be subject to formal criticism. Before responsible politicians approve a new thrust into space they will demand attractive, defensible, and detailed proposals that explain the WHEN, HOW and WHY of each stage of an expanded program of 21st century space research, development and exploration. In particular, the claims of daring, innovative, but untried systems must be compared with the known performance of existing technologies. The time has come to supersede the present haphazard approach to strategic space studies with a formal international structure to plan for future advanced space missions under the aegis of the world's national space agencies, and supported by governments and the corporate sector.

  3. 40 CFR 35.615 - Maximum federal share.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... STATE AND LOCAL ASSISTANCE Environmental Program Grants for Tribes Wetlands Development Grant Program... plan costs for the development or refinement of a wetlands protection and management program. Nonpoint...

  4. 40 CFR 35.615 - Maximum federal share.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... STATE AND LOCAL ASSISTANCE Environmental Program Grants for Tribes Wetlands Development Grant Program... plan costs for the development or refinement of a wetlands protection and management program. Nonpoint...

  5. 40 CFR 35.615 - Maximum federal share.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... STATE AND LOCAL ASSISTANCE Environmental Program Grants for Tribes Wetlands Development Grant Program... plan costs for the development or refinement of a wetlands protection and management program. Nonpoint...

  6. Agency leads in family planning assistance.

    PubMed

    1989-01-01

    The US Agency for International Development (USAID) is the main source of family planning assistance for the developing countries of the world. It accounts for 45% of the funding for population programs worldwide. USAID's policy promotes expanded family planning services, providing a broad range of birth control methods, promotes consumer delivery systems, and urges private sector assistance. Since the program began in the 1960's the number of people in the developing world using family planning increased from 15 million to 200 million. In 1959 there was only 1 country with a population policy, India, now there are 63 developing countries with policies. USAID has brought $567.7 million worth of contraceptives for distribution in 75 countries including 6.9 billion condoms, 1.6 billion cycles of pills, 49.7 million IUD's, and 16.5 vaginal foam tablets. USAID has funded research in contraceptives including the Hulka clip, laparoscopic sterilization, low-estrogen pills, progestin pills, Copper-T IUD, NORPLANT and NORPLANT 2. In addition, funding for a 3-month injectable and a 12 month pellet is being provided. The agency has also worked with the entertainment industry to produce songs to warn of the dangers of early pregnancy. They have also conducted the largest survey research program, using data from 149 surveys in 65 countries to assess the demand for family planning and analyze population dynamics. The number of women of reproductive age will increase 45% by the year 2000 increasing the demand for family planning dramatically. The resources needed by 2000 are estimated to be $5 billion and $7 billion by the year 2010. This will require efforts from government, private industry, and private voluntary organizations. USAID has developed a contraceptive marketing project worldwide to promote birth control sales and family planning. Another program helps private sector companies promote their own family planning services.

  7. Medical Applications of the PHITS Code (3): User Assistance Program for Medical Physics Computation.

    PubMed

    Furuta, Takuya; Hashimoto, Shintaro; Sato, Tatsuhiko

    2016-01-01

    DICOM2PHITS and PSFC4PHITS are user assistance programs for medical physics PHITS applications. DICOM2PHITS is a program to construct the voxel PHITS simulation geometry from patient CT DICOM image data by using a conversion table from CT number to material composition. PSFC4PHITS is a program to convert the IAEA phase-space file data to PHITS format to be used as a simulation source of PHITS. Both of the programs are useful for users who want to apply PHITS simulation to verification of the treatment planning of radiation therapy. We are now developing a program to convert dose distribution obtained by PHITS to DICOM RT-dose format. We also want to develop a program which is able to implement treatment information included in other DICOM files (RT-plan and RT-structure) as a future plan.

  8. Modular space station, phase B extension. Program operations plan

    NASA Technical Reports Server (NTRS)

    1971-01-01

    An organized approach is defined for establishing the most significant requirements pertaining to mission operations, information management, and computer program design and development for the modular space station program. The operations plan pertains to the space station and experiment module program elements and to the ground elements required for mission management and mission support operations.

  9. Evaluation of the Implementation of Operations and Maintenance Programs in New Jersey Schools.

    ERIC Educational Resources Information Center

    Kominsky, John R.; Freyberg, Ronald W.; Gerber, Donald R.; Centifonti, Gary J.

    All schools are required to develop and implement an asbestos management plan (AMP). The key component of this plan is each school's operations and maintenance (O&M) program. This report outlines the importance of such programs. It describes an O&M program as an administrative framework that prescribes specific activities and work…

  10. Promoting public health through state cancer control plans: a review of capacity and sustainability.

    PubMed

    Ory, Marcia G; Sanner, Brigid; Vollmer Dahlke, Deborah; Melvin, Cathy L

    2015-01-01

    The Centers for Disease Prevention and Control's National Comprehensive Cancer Control (CCC) Program oversee CCC programs designed to develop and implement CCC plans via CCC coalitions, alliances, or consortia of program stakeholders. We reviewed 40 up-to-date plans for states and the District of Columbia in order to assess how capacity building and sustainability, two evidence-based practices necessary for organizational readiness, positive growth, and maintenance are addressed. We employed an electronic key word search, supplemented by full text reviews of each plan to complete a content analysis of the CCC plans. Capacity is explicitly addressed in just over half of the plans (53%), generally from a conceptual point of view, with few specifics as to how capacity will be developed or enhanced. Roles and responsibilities, timelines for action, and measurements for evaluation of capacity building are infrequently mentioned. Almost all (92%) of the 40 up-to-date plans address sustainability on at least a cursory level, through efforts aimed at funding or seeking funding, policy initiatives, and/or partnership development. However, few details as to how these strategies will be implemented are found in the plans. We present the Texas plan as a case study offering detailed insight into how one plan incorporated capacity building and sustainability into its development and implementation. Training, technical assistance, templates, and tools may help CCC coalition members address capacity and sustainability in future planning efforts and assure the inclusion of capacity building and sustainability approaches in CCC plans at the state, tribal, territorial, and jurisdiction levels.

  11. Community Resources for Career Education: Starring Baltimore's McCormick Plan

    ERIC Educational Resources Information Center

    Carey, E. Niel; Marshall, Howard E.

    1973-01-01

    The article develops from a general discussion of the utilization of community resources in career education to a discussion of a particular program--the McCormick Plan in Baltimore--and other Maryland programs. Suggestions drawn from those programs are offered for identifying and using such resources. (AG)

  12. Planned Programming Pays Dividends

    ERIC Educational Resources Information Center

    Geraldi, Kevin M.

    2008-01-01

    In this article, the author explains that before beginning to create concert programs, it is important that ensemble conductors first develop a long-term curricular plan to which each individual program will contribute. He continues that if an ensemble curriculum is devised so that students make progress over the long term, dynamic growth can take…

  13. Guidelines for Implementing a Real Estate Cooperative Education Program.

    ERIC Educational Resources Information Center

    Pearson, Thomas R.

    Background information and guidelines are provided for the development of cooperative education programs for real estate industry personnel. The first section outlines the operation of cooperative education programs and presents two organizational plans: the alternating plan, where students attend class full-time and work full-time during…

  14. 78 FR 43230 - Agency Information Collection Activities: Submission to OMB for Reinstatement, Without Change, of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    ... Insured Credit Unions to maintain an information security program and an incident response plan that... Federally Insured Credit Unions to maintain an information security program and an incident response plan... credit unions to develop a written security program to safeguard sensitive member information. This...

  15. Quality Improvement Program Plan for Special Educators (QUIPP), 1990-91. OREA Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    This evaluation report describes the Quality Improvement Program Plan for Special Educators (QUIPP) which provides supplemental professional development opportunities for New York City special education professionals and paraprofessionals at the elementary, middle, and intermediate/junior high school levels. The program stresses design of the…

  16. Planning an Education Program for Dental Hygienists.

    ERIC Educational Resources Information Center

    Bruce, Harry W.; And Others

    Intended for adaptation to local situations, the handbook was prepared to assist interested groups to determine whether a dental hygiene educational program is needed and feasible, and to supply basic guidelines for planning. The introduction deals with dental hygiene in preventive dentistry and the historical development of educational programs.…

  17. Comparative Methods of Program Planning.

    ERIC Educational Resources Information Center

    Palinchak, Robert S.

    All planning techniques and models concern themselves with four basic tasks: (1) the determination of the objectives or purpose of the activity, (2) the development of programs likely to attain the objectives, (3) the organization of experiences into a coherent, meaningful unit, and (4) the evaluation of the extent to which programs meet the…

  18. A Guide to Planning Alcoholism Treatment Programs.

    ERIC Educational Resources Information Center

    McGough, Dixie P.; Hindman, Margaret H.

    This guide contains information from the alcoholism literature and from interviews with people in state alcoholism agencies, major professional associations, and public and private service programs. It is designed to help readers plan and develop community alcoholism programs by providing an overview of the many considerations involved in starting…

  19. Program of Research for Forests and Associated Rangelands

    Treesearch

    Nelson S. Loftus; Joseph G. Massey; [Compilers

    1978-01-01

    This research plan for the Southern Region is a companion publication to the National Program of Research for Forests and Associated Rangelands. While the national program reflects both regional and national priorities, this plan provides details on forestry research matters concerning the South. For the reader's convenience, background information on development...

  20. SAN JUAN BAY ESTUARY PROGRAM COMPREHENSIVE CONSERVATION AND MANAGEMENT PLAN IMPLEMENTATION TRACKING REPORT, 2004

    EPA Science Inventory

    Four years after the approval of its Comprehensive Conservation and Management Plan (CCMP), the San Juan Bay Estuary Program (SJBEP) is working towards the implementation stage of its 49 actions. During the last three years the program has focused its efforts in developing a coll...

  1. TTIP: Texas Teacher Internship Program 1994 Curriculum Implementation Plans.

    ERIC Educational Resources Information Center

    Walenta, Brian T., Ed.

    The Texas Teacher Internship Program (TTIP) is a competitive program for science, technology and mathematics teachers who serve as summer interns at industry and university sites in order to experience real world applications of the subjects they teach. This document contains curriculum implementation plans developed by the teachers to illustrate…

  2. The Role of Communications in Population and Family Planning Programs.

    ERIC Educational Resources Information Center

    Sweeney, William O.

    In this paper, the author outlines the historical development of information and education programs for population control and family planning, arguing that communications activities should receive as much emphasis as the health services program. The public information aspect includes use of mass media, advertising and promotion, public relations…

  3. University Strategic Planning: A Process for Change in a Principal Preparation Program

    ERIC Educational Resources Information Center

    Guerra, Federico R.; Zamora, Roberto; Hernandez, Rosalinda; Menchaca, Velma

    2017-01-01

    This study describes a strategic planning process used for developing an educational leadership program that prepares principals for leading 21st century schools. The plan is based on recommendations received from the External reviewers representing Southern Association of Colleges and Schools, the Texas Education Agency, survey responses received…

  4. 40 CFR 403.9 - POTW pretreatment programs and/or authorization to revise pretreatment standards: Submission for...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... quality management plans. (1) In order to be approved the POTW Pretreatment Program shall be consistent with any approved water quality management plan developed in accordance with 40 CFR parts 130, 131, as revised, where such 208 plan includes Management Agency designations and addresses pretreatment in a...

  5. Viewpoint: Planners as Sensemakers and Sensegivers--Reshaping Austerity in College and University Planning

    ERIC Educational Resources Information Center

    Harris, Nathan F.

    2011-01-01

    Many planning offices are experiencing an identity crisis. Before the recession, their role was clear: provide colleges and universities the analytical support needed to develop academic programs and expand facilities. For more than a decade, planning offices were the workhorses supporting ambitious growth strategies. New and improved programs and…

  6. 45 CFR 1355.35 - Program improvement plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... developed jointly by title IV-E agency and Federal staff in consultation with the review team; (ii) Identify... how the action steps in the plan build on and make progress over prior program improvement plans; (vii... evaluated jointly by the title IV-E agency and ACF, in collaboration with other members of the review team...

  7. Facilities Planning Guide for Special Education Programs: Planning Accessibility for the Handicapped in Public Schools.

    ERIC Educational Resources Information Center

    Brooks, Kenneth W.

    The guide details characteristics to provide architecturally accessible special education programs for handicapped students. Impetus for the accessibility movement is traced to legislation, including the Architectural Barriers Act and Sections 503 and 504 of the Rehabilitation Act of 1973. Planning features considered are the development of a…

  8. Electron/proton spectrometer certification documentation analyses

    NASA Technical Reports Server (NTRS)

    Gleeson, P.

    1972-01-01

    A compilation of analyses generated during the development of the electron-proton spectrometer for the Skylab program is presented. The data documents the analyses required by the electron-proton spectrometer verification plan. The verification plan was generated to satisfy the ancillary hardware requirements of the Apollo Applications program. The certification of the spectrometer requires that various tests, inspections, and analyses be documented, approved, and accepted by reliability and quality control personnel of the spectrometer development program.

  9. Update on PISCES

    NASA Technical Reports Server (NTRS)

    Pearson, Don; Hamm, Dustin; Kubena, Brian; Weaver, Jonathan K.

    2010-01-01

    An updated version of the Platform Independent Software Components for the Exploration of Space (PISCES) software library is available. A previous version was reported in Library for Developing Spacecraft-Mission-Planning Software (MSC-22983), NASA Tech Briefs, Vol. 25, No. 7 (July 2001), page 52. To recapitulate: This software provides for Web-based, collaborative development of computer programs for planning trajectories and trajectory- related aspects of spacecraft-mission design. The library was built using state-of-the-art object-oriented concepts and software-development methodologies. The components of PISCES include Java-language application programs arranged in a hierarchy of classes that facilitates the reuse of the components. As its full name suggests, the PISCES library affords platform-independence: The Java language makes it possible to use the classes and application programs with a Java virtual machine, which is available in most Web-browser programs. Another advantage is expandability: Object orientation facilitates expansion of the library through creation of a new class. Improvements in the library since the previous version include development of orbital-maneuver- planning and rendezvous-launch-window application programs, enhancement of capabilities for propagation of orbits, and development of a desktop user interface.

  10. Shuttle free-flying teleoperator system experiment definition. Volume 3: program development requirements

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The planning data are presented for subsequent phases of free-flying teleoperator program (FFTO) and includes costs, schedules and supporting research and technology activities required to implement the free-flying teleoperator system and associated flight equipment. The purpose of the data presented is to provide NASA with the information needed to continue development of the FFTO and integrate it into the space shuttle program. The planning data describes three major program phases consisting of activities and events scheduled to effect integrated design, development, fabrication and operation of an FFTO system. Phase A, Concept Generation, represents a study effort directed toward generating and evaluating a number of feasible FFTO experiment system concepts. Phase B, Definition, will include preliminary design and supporting analysis of the FFTO, the shuttle based equipment and ground support equipment. Phase C/D, Design, Development and Operations will include detail design of the operational FFTO, its integration into the space shuttle, hardware fabrication and testing, delivery of flight hardware and support of flight operations. Emphasis is placed on the planning for Phases A and B since these studies will be implemented early in the development cycle. Phase C/D planning is more general and subject to refinement during the definition phase.

  11. 7 CFR 23.9 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... responsive to rural development needs and activities. (c) The Regional Programs will concentrate on the high... development programs and policies. (d) Regional Programs will be consonant with all rural development... Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK Regional Program § 23.9 General. (a...

  12. Enhanced Damage-Resistant Optics for Spaceflight Laser Systems: Workshop findings and recommendations

    NASA Technical Reports Server (NTRS)

    Schulze, Norman; Cimolino, Marc; Guenther, Arthur; Mcminn, Ted; Rainer, Frank; Schmid, Ansgar; Seitel, Steven C.; Soileau, M. J.; Theon, John S.; Walz, William

    1991-01-01

    NASA has defined a program to address critical laser-induced damage issues peculiar to its remote sensing systems. The Langley Research Center (LaRC), with input from the Goddard Space Flight Center (GSFC), has developed a program plan focusing on the certification of optical materials for spaceflight applications and the development of techniques to determine the reliability of such materials under extended laser exposures. This plan involves cooperative efforts between NASA and optics manufacturers to quantify the performance of optical materials for NASA systems and to ensure NASA's continued application of the highest quality optics possible for enhanced system reliability. A review panel was organized to assess NASA's optical damage concerns and to evaluate the effectiveness of the LaRC proposed program plan. This panel consisted of experts in the areas of laser-induced damage, optical coating manufacture, and the design and development of laser systems for space. The panel was presented information on NASA's current and planned laser remote sensing programs, laser-induced damage problems already encountered in NASA systems, and the proposed program plan to address these issues. Additionally, technical presentations were made on the state of the art in damage mechanisms, optical materials testing, and issues of coating manufacture germane to laser damage.

  13. The Philippine Population Program strategic plan (1981-1985).

    PubMed

    1980-01-01

    The challenge of the population problem is to effectively mobilize the country's population for productive activity. Rather than simply concern with controlling numbers, emphasis is on human resource management, the structure of employment, labor productivity and income distribution. The long-term Philippine Development Plans reflect recognition of the dynamic interaction between fertility, productivity and welfare. Objectives of the 5-Year Philippine Development Plan 1978-1982, the 10-Year Plan 1978-1987, and the Long-Term Plan to year 2000 integrate population concerns and socioeconomic goals. These objectives include the following: promotion of social development and social justice; attainment of self-sufficiency in food and greater self-reliance in energy; increased development of lagging regions, especially rural areas; improvements of habitat through the development of human settlements and proper management of the environment; and maintenance of population growth at levels conducive to national welfare. Some population concerns that are directly relevant to welfare (in addition to those related to productivity) are distribution patterns of social goods and services, access to services by sectors of the population, and buying power of families. As a total population policy should establish closer linkages, operationally, between the demographic aspects and the productivity and welfare aspects of development, the mission of the National Population Program encompasses 3 areas: fertility; productivity; and welfare. Strategic policies include the following: abortion is unacceptable as a contraceptive method; the population program shall be non-coercive; and the program shall view individual and family welfare in the context and as the main objective of national socioeconomic programs.

  14. 24 CFR 91.2 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Neighborhood Development program (see 24 CFR part 594); (15) The “Lead-Based Paint Hazard Reduction Program... following formula grant programs are covered by the consolidated plan: (1) The Community Development Block...

  15. 24 CFR 91.2 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Neighborhood Development program (see 24 CFR part 594); (15) The “Lead-Based Paint Hazard Reduction Program... following formula grant programs are covered by the consolidated plan: (1) The Community Development Block...

  16. 24 CFR 91.2 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Neighborhood Development program (see 24 CFR part 594); (15) The “Lead-Based Paint Hazard Reduction Program... following formula grant programs are covered by the consolidated plan: (1) The Community Development Block...

  17. 24 CFR 91.2 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Neighborhood Development program (see 24 CFR part 594); (15) The “Lead-Based Paint Hazard Reduction Program... following formula grant programs are covered by the consolidated plan: (1) The Community Development Block...

  18. 46 CFR 8.530 - Plan development and approval.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Plan development and approval. 8.530 Section 8.530 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC VESSEL INSPECTION ALTERNATIVES Streamlined Inspection Program § 8.530 Plan development and approval. The Company SIP Agent will...

  19. 46 CFR 8.530 - Plan development and approval.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Plan development and approval. 8.530 Section 8.530 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC VESSEL INSPECTION ALTERNATIVES Streamlined Inspection Program § 8.530 Plan development and approval. The Company SIP Agent will...

  20. Implementation of a new advanced graduate education program in oral implantology.

    PubMed

    Gallucci, German O; Weber, Hans Peter; Kalenderian, Elsbeth

    2012-10-01

    The academic program for the Harvard School of Dental Medicine's Advanced Graduate Program in Oral Implantology is based on scientific evidence applied to educational quality, translational research, patient care, and service. The objective of the program is to enable highly motivated individuals with proven scholarship and excellence in patient care to achieve academic leadership in the clinical and scientific fields of implant dentistry and tissue regeneration. A detailed curriculum describing the academic program, as well as a business plan (which included a management plan describing the organizational structure, financial implications, and market forces) and implementation and communication plans, were developed before moving forward. With careful academic and business planning, the result was a vibrant implant program, in which all placements and restorations of implants are coordinated with regard to practice management. The program is integrated into the existing clinical care model and has been financially self-sustaining from its inception. Six students have participated in the last two years. On average, each student performed seventy-nine procedures on twenty-nine patients, generating over $46,000 in production. The curriculum includes didactics, hands-on clinical learning, and research activities. Research is a critical component as well. The results demonstrate that the time taken to develop a detailed curriculum and business plan for a new academic program, which anticipated and resolved potential barriers to success, was instrumental in the successful implementation of an oral implantology residency program.

  1. Using an intervention mapping framework to develop an online mental health continuing education program for pharmacy staff.

    PubMed

    Wheeler, Amanda; Fowler, Jane; Hattingh, Laetitia

    2013-01-01

    Current mental health policy in Australia recognizes that ongoing mental health workforce development is crucial to mental health care reform. Community pharmacy staff are well placed to assist people with mental illness living in the community; however, staff require the knowledge and skills to do this competently and effectively. This article presents the systematic planning and development process and content of an education and training program for community pharmacy staff, using a program planning approach called intervention mapping. The intervention mapping framework was used to guide development of an online continuing education program. Interviews with mental health consumers and carers (n = 285) and key stakeholders (n = 15), and a survey of pharmacy staff (n = 504) informed the needs assessment. Program objectives were identified specifying required attitudes, knowledge, skills, and confidence. These objectives were aligned with an education technique and delivery strategy. This was followed by development of an education program and comprehensive evaluation plan. The program was piloted face to face with 24 participants and then translated into an online program comprising eight 30-minute modules for pharmacists, 4 of which were also used for support staff. The evaluation plan provided for online participants (n ≅ 500) to be randomized into intervention (immediate access) or control groups (delayed training access). It included pre- and posttraining questionnaires and a reflective learning questionnaire for pharmacy staff and telephone interviews post pharmacy visit for consumers and carers. An online education program was developed to address mental health knowledge, attitudes, confidence, and skills required by pharmacy staff to work effectively with mental health consumers and carers. Intervention mapping provides a systematic and rigorous approach that can be used to develop a quality continuing education program for the health workforce. Copyright © 2013 The Alliance for Continuing Education in the Health Professions, the Society for Academic Continuing Medical Education, and the Council on CME, Association for Hospital Medical Education.

  2. [Integration of demographic variables into development plans in the Sahel].

    PubMed

    Wane, H R

    1992-07-01

    A founding principle of the Program of Action of N'Djamena is the interdependence of population and development and the need for development strategies to take demographic factors into account. The concept of integration of population variables into development has evolved since its introduction in the 1974 World Population Plan of Action from a simple description of population size, growth rates, and distribution to a stress on harmonizing population policies and development policies with macroeconomic variables. The essence of the concept is the consideration given by development policies and programs to the interrelations between population, resources, the environment, and development factors. Population variables and goals should ideally be treated as endogenous variables in development planning, but in practice the extreme complexity of such a systematic approach limits its ability to be made operational. Usually the most crucial problems only are included. Integrated planning is composed of explicit or implicit population policies intended to influence demographic variables and of socioeconomic policies intended to adapt to demographic change. In the Sahel, only Senegal, Burkina Faso, and Mali have formal population policies, but around 1980 several countries of the region began to show interest in influencing demographic variables as they did economic variables. Fundamental principles for developing an integration strategy can be applied regardless or whether the plan is based on projections, analysis of interaction of a demographic variable with factors specific to a sector, or a monosectorial or multisectorial demoeconomic planning model. Demographic data is used more frequently in diagnosing problems than in developing projections or formulating objectives. The level of disaggregation of demographic projections and estimates tends to be low, despite the great potential utility of demographic projections in planning. Demographic projections can be useful in analyses of the extent of changes and the implications of alternative scenarios of development planning. The most frequently used demographic variables in development planning have been spatial distribution of the population and mortality. An examination of past development plans in Mali relating to population and nutrition and population and health reveals several inconsistencies between stated goals and strategies intended to achieve them. The incoherence can be explained in part by the absence of a coherent national population policy, the failure to translate the population policy into programs that take into account reciprocal effects of demographic trends and economic perspectives and their social effects, and the absence of disaggregated population projections. An example from Senegal demonstrates the constraints imposed by structural adjustment programs on the entire planning process.

  3. Test Planning Approach and Lessons

    NASA Technical Reports Server (NTRS)

    Parkinson, Douglas A.; Brown, Kendall K.

    2004-01-01

    As NASA began technology risk reduction activities and planning for the next generation launch vehicle under the Space Launch Initiative (SLI), now the Next Generation Launch Technology (NGLT) Program, a review of past large liquid rocket engine development programs was performed. The intent of the review was to identify any significant lessons from the development testing programs that could be applied to current and future engine development programs. Because the primary prototype engine in design at the time of this study was the Boeing-Rocketdyne RS-84, the study was slightly biased towards LOX/RP-1 liquid propellant engines. However, the significant lessons identified are universal. It is anticipated that these lessons will serve as a reference for test planning in the Engine Systems Group at Marshall Space Flight Center (MSFC). Towards the end of F-1 and J-2 engine development testing, NASA/MSFC asked Rocketdyne to review those test programs. The result was a document titled, Study to Accelerate Development by Test of a Rocket Engine (R-8099). The "intent (of this study) is to apply this thinking and learning to more efficiently develop rocket engines to high reliability with improved cost effectivenes" Additionally, several other engine programs were reviewed - such as SSME, NSTS, STME, MC-1, and RS-83- to support or refute the R-8099. R-8099 revealed two primary lessons for test planning, which were supported by the other engine development programs. First, engine development programs can benefit from arranging the test program for engine system testing as early as feasible. The best test for determining environments is at the system level, the closest to the operational flight environment. Secondly, the component testing, which tends to be elaborate, should instead be geared towards reducing risk to enable system test. Technical risk can be reduced at the component level, but the design can only be truly verified and validated after engine system testing.

  4. Development of an Experiment High Performance Nozzle Research Program

    NASA Technical Reports Server (NTRS)

    2004-01-01

    As proposed in the above OAI/NASA Glenn Research Center (GRC) Co-Operative Agreement the objective of the work was to provide consultation and assistance to the NASA GRC GTX Rocket Based Combined Cycle (RBCC) Program Team in planning and developing requirements, scale model concepts, and plans for an experimental nozzle research program. The GTX was one of the launch vehicle concepts being studied as a possible future replacement for the aging NASA Space Shuttle, and was one RBCC element in the ongoing NASA Access to Space R&D Program (Reference 1). The ultimate program objective was the development of an appropriate experimental research program to evaluate and validate proposed nozzle concepts, and thereby result in the optimization of a high performance nozzle for the GTX launch vehicle. Included in this task were the identification of appropriate existing test facilities, development of requirements for new non-existent test rigs and fixtures, develop scale nozzle model concepts, and propose corresponding test plans. Also included were the evaluation of originally proposed and alternate nozzle designs (in-house and contractor), evaluation of Computational Fluid Dynamics (CFD) study results, and make recommendations for geometric changes to result in improved nozzle thrust coefficient performance (Cfg).

  5. Automated process planning system

    NASA Technical Reports Server (NTRS)

    Mann, W.

    1978-01-01

    Program helps process engineers set up manufacturing plans for machined parts. System allows one to develop and store library of similar parts characteristics, as related to particular facility. Information is then used in interactive system to help develop manufacturing plans that meet required standards.

  6. U.S. Department of Transportation research and development plan : a report to Congress

    DOT National Transportation Integrated Search

    2000-05-01

    This report is a top-level planning document for research and development in the U.S. Department of Transportation. It focuses on internal planning and coordination procedures, key DOT programs, partnership initiatives, enabling research concepts, ed...

  7. Airport Surface Traffic Control Visual Ground Aids Engineering and Development Plan

    DOT National Transportation Integrated Search

    1977-01-01

    The plan described in this document supports the overall program at the Transportation Systems Center to define, design, develop, and evaluate systems that meet the requirements of airport surface traffic control. This plan is part of documentation s...

  8. Recommendations for safety planning, data collection, evaluation and reporting during drug, biologic and vaccine development: a report of the safety planning, evaluation, and reporting team.

    PubMed

    Crowe, Brenda J; Xia, H Amy; Berlin, Jesse A; Watson, Douglas J; Shi, Hongliang; Lin, Stephen L; Kuebler, Juergen; Schriver, Robert C; Santanello, Nancy C; Rochester, George; Porter, Jane B; Oster, Manfred; Mehrotra, Devan V; Li, Zhengqing; King, Eileen C; Harpur, Ernest S; Hall, David B

    2009-10-01

    The Safety Planning, Evaluation and Reporting Team (SPERT) was formed in 2006 by the Pharmaceutical Research and Manufacturers of America. SPERT's goal was to propose a pharmaceutical industry standard for safety planning, data collection, evaluation, and reporting, beginning with planning first-in-human studies and continuing through the planning of the post-product-approval period. SPERT's recommendations are based on our review of relevant literature and on consensus reached in our discussions. An important recommendation is that sponsors create a Program Safety Analysis Plan early in development. We also give recommendations for the planning of repeated, cumulative meta-analyses of the safety data obtained from the studies conducted within the development program. These include clear definitions of adverse events of special interest and standardization of many aspects of data collection and study design. We describe a 3-tier system for signal detection and analysis of adverse events and highlight proposals for reducing "false positive" safety findings. We recommend that sponsors review the aggregated safety data on a regular and ongoing basis throughout the development program, rather than waiting until the time of submission. We recognize that there may be other valid approaches. The proactive approach we advocate has the potential to benefit patients and health care providers by providing more comprehensive safety information at the time of new product marketing and beyond.

  9. The Pilot Land Data System: Report of the Program Planning Workshops

    NASA Technical Reports Server (NTRS)

    1984-01-01

    An advisory report to be used by NASA in developing a program plan for a Pilot Land Data System (PLDS) was developed. The purpose of the PLDS is to improve the ability of NASA and NASA sponsored researchers to conduct land-related research. The goal of the planning workshops was to provide and coordinate planning and concept development between the land related science and computer science disciplines, to discuss the architecture of the PLDs, requirements for information science technology, and system evaluation. The findings and recommendations of the Working Group are presented. The pilot program establishes a limited scale distributed information system to explore scientific, technical, and management approaches to satisfying the needs of the land science community. The PLDS paves the way for a land data system to improve data access, processing, transfer, and analysis, which land sciences information synthesis occurs on a scale not previously permitted because of limits to data assembly and access.

  10. MnDOT research program strategic plan 2017-2022.

    DOT National Transportation Integrated Search

    2017-03-01

    In response to the top transportation trends in Minnesota, and opportunities and challenges facing its transportation system, MnDOT has developed this five-year Research Program Strategic Plan (2017 2022) to take stock of its research portfolio, ...

  11. Development of a theory- and evidence-based intervention to enhance implementation of physical therapy guidelines for the management of low back pain

    PubMed Central

    2014-01-01

    Background Systematic planning could improve the generally moderate effectiveness of interventions to enhance adherence to clinical practice guidelines. The aim of our study was to demonstrate how the process of Intervention Mapping was used to develop an intervention to address the lack of adherence to the national CPG for low back pain by Dutch physical therapists. Methods We systematically developed a program to improve adherence to the Dutch physical therapy guidelines for low back pain. Based on multi-method formative research, we formulated program and change objectives. Selected theory-based methods of change and practical applications were combined into an intervention program. Implementation and evaluation plans were developed. Results Formative research revealed influential determinants for physical therapists and practice quality managers. Self-regulation was appropriate because both the physical therapists and the practice managers needed to monitor current practice and make and implement plans for change. The program stimulated interaction between practice levels by emphasizing collective goal setting. It combined practical applications, such as knowledge transfer and discussion-and-feedback, based on theory-based methods, such as consciousness raising and active learning. The implementation plan incorporated the wider environment. The evaluation plan included an effect and process evaluation. Conclusions Intervention Mapping is a useful framework for formative data in program planning in the field of clinical guideline implementation. However, a decision aid to select determinants of guideline adherence identified in the formative research to analyse the problem may increase the efficiency of the application of the Intervention Mapping process. PMID:24428945

  12. Development of a theory- and evidence-based intervention to enhance implementation of physical therapy guidelines for the management of low back pain.

    PubMed

    Rutten, Geert M; Harting, Janneke; Bartholomew, Leona K; Braspenning, Jozé C; van Dolder, Rob; Heijmans, Marcel Fgj; Hendriks, Erik Jm; Kremers, Stef Pj; van Peppen, Roland Ps; Rutten, Steven Tj; Schlief, Angelique; de Vries, Nanne K; Oostendorp, Rob Ab

    2014-01-15

    Systematic planning could improve the generally moderate effectiveness of interventions to enhance adherence to clinical practice guidelines. The aim of our study was to demonstrate how the process of Intervention Mapping was used to develop an intervention to address the lack of adherence to the national CPG for low back pain by Dutch physical therapists. We systematically developed a program to improve adherence to the Dutch physical therapy guidelines for low back pain. Based on multi-method formative research, we formulated program and change objectives. Selected theory-based methods of change and practical applications were combined into an intervention program. Implementation and evaluation plans were developed. Formative research revealed influential determinants for physical therapists and practice quality managers. Self-regulation was appropriate because both the physical therapists and the practice managers needed to monitor current practice and make and implement plans for change. The program stimulated interaction between practice levels by emphasizing collective goal setting. It combined practical applications, such as knowledge transfer and discussion-and-feedback, based on theory-based methods, such as consciousness raising and active learning. The implementation plan incorporated the wider environment. The evaluation plan included an effect and process evaluation. Intervention Mapping is a useful framework for formative data in program planning in the field of clinical guideline implementation. However, a decision aid to select determinants of guideline adherence identified in the formative research to analyse the problem may increase the efficiency of the application of the Intervention Mapping process.

  13. Dr. Haryono Suyono, National Family Planning Coordinating Board, Indonesia.

    PubMed

    1986-11-01

    The goal of the Indonesian family planning program has been to institutionalize both the concept and the norm of a small, happy and prosperous family in a manner that is acceptable to all. To this end, a larger role for the private sector in family planning (FP) has been promoted. While the government program has been very effective in the villages, it was not as effective in the urban areas where there are more diverse populations. Several meetings were held to develop a strategy for FP programs in the urban areas involving both the nongovernment organizations (NGOs) and commercial enterprises. It was agreed that several model programs would be developed through the NGOs with funds coming from both international health organizations and the National Family Planning Coordinating Board. It was hoped that the NGOs would develop into self-sufficient organizations. 1 urban activity that has just started is a specially designed social marketing project aimed at increasing the involvement and commitment of males through a condom distribution scheme. Another promising development is the shifting of the management and implementation of FP programs from the government to the community itself. A primary emphasis is to activate the private sector to expand its role in providing FP information and services. The overall strategy is to create a climate that will make it easier for people to increase their role in family planning service delivery and acceptance through mobilization of resources, funds, facilities and infrastructure so that acceptors will gradually pay for family planning services by themselves according to their needs.

  14. Robinson Rancheria Strategic Energy Plan; Middletown Rancheria Strategic Energy Plan, Scotts Valley Rancheria Strategic Energy Plan, Elem Indian Colony Strategic Energy Plan, Upperlake Rancheria Strategic Energy Plan, Big Valley Rancheria Strategic Energy Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGinnis and Associates LLC

    2008-08-01

    The Scotts Valley Band of Pomo Indians is located in Lake County in Northern California. Similar to the other five federally recognized Indian Tribes in Lake County participating in this project, Scotts Valley Band of Pomo Indians members are challenged by generally increasing energy costs and undeveloped local energy resources. Currently, Tribal decision makers lack sufficient information to make informed decisions about potential renewable energy resources. To meet this challenge efficiently, the Tribes have committed to the Lake County Tribal Energy Program, a multi Tribal program to be based at the Robinson Rancheria and including The Elem Indian Colony, Bigmore » Valley Rancheria, Middletown Rancheria, Habematolel Pomo of Upper Lake and the Scotts Valley Pomo Tribe. The mission of this program is to promote Tribal energy efficiency and create employment opportunities and economic opportunities on Tribal Lands through energy resource and energy efficiency development. This program will establish a comprehensive energy strategic plan for the Tribes based on Tribal specific plans that capture economic and environmental benefits while continuing to respect Tribal cultural practices and traditions. The goal is to understand current and future energy consumption and develop both regional and Tribe specific strategic energy plans, including action plans, to clearly identify the energy options for each Tribe.« less

  15. 77 FR 9955 - Announcement of Funding Awards for the Community Challenge Planning Grant Program for Fiscal Year...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5500-FA-33] Announcement of Funding Awards for the Community Challenge Planning Grant Program for Fiscal Year 2011 AGENCY: Office of... Section 102(a)(4)(C) of the Department of Housing and Urban Development Reform Act of 1989, this...

  16. Employment Assistance Planning Programs for Welfare Recipients: An Evaluation and the Development of a Screening Measure.

    ERIC Educational Resources Information Center

    Peterson, Gary W.; And Others

    A project was conducted to develop an assessment instrument for use in identifying welfare recipients who are potentially employable and to evaluate the effectiveness of Florida's three existing pilot employment assistance planning programs (termed PAPAs after the Public Assistance Productivity Act). Data on the employment status of 98 individuals…

  17. Personal Finance Education Guide for Planning Secondary School Programs. Second Edition.

    ERIC Educational Resources Information Center

    Oregon State Dept. of Education, Salem.

    This guide has been developed to help teachers plan programs that meet both individual and common needs of all students in personal finance education. It defines the skills and knowledge necessary to function as an intelligent consumer in our complex and rapidly changing economic order. The guide has been developed around five basic concepts:…

  18. Marketing Plan for the National Security Technology Incubator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This marketing plan was developed as part of the National Security Preparedness Project by the Arrowhead Center of New Mexico State University. The vision of the National Security Technology Incubator program is to be a successful incubator of technologies and private enterprise that assist the NNSA in meeting new challenges in national safety and security. The plan defines important aspects of developing the incubator, such as defining the target market, marketing goals, and creating strategies to reach the target market while meeting those goals. The three main marketing goals of the incubator are: 1) developing marketing materials for the incubatormore » program; 2) attracting businesses to become incubator participants; and 3) increasing name recognition of the incubator program on a national level.« less

  19. The effectiveness of family-planning programmes.

    PubMed

    Mauldin, W P

    1989-01-01

    By the mid-1960s, countries that accounted for 66% of the population of developing countries had adopted policies designed to reduce their rates of population growth; by 1986, the corresponding figure had reached 78%. In the developing regions as a whole, fertility has fallen by more than 30% since 1950. Contraceptive use has risen sharply, and there has been more than 10-fold increase in the number of couples in developing countries who use contraceptives. There is a very strong association between use of contraception and fertility in developing countries. Social and economic modernization is also taking place, although quite unevenly in the developing regions, so that the relationship of modernization is fertility is not very easy to demonstrate. In general, the experience of the developing countries suggest that a strong family- planning program effort can, and does, lead to a more rapid fertility decline than would be likely based only on socioeconomic variables. The effectiveness of family-planning programs can be enhanced by increasing the range of choice of contraceptive methods offered. However, it is difficult to disentangle the various factors that contribute to the effectiveness of family-planning programs. The public sector is the main supplier of family-planning services in most developing countries, and there is no clear trend towards the reliance on the private sector.

  20. Cooperative Program and Facilities Planning, Southern Maine Vocational Technical Institute--University of Maine at Portland-Gorham. Final Report: Higher Education Facilities Planning Grant.

    ERIC Educational Resources Information Center

    Pressley, Warren H., Jr.

    In response to the great need for less than baccalaureate degree programs in Maine, a grant was made to finance the development of the three programs described here. Offered are a AA degree program in Hotel, Motel, and Restaurant Management, a program of inservice education in Respiratory Therapy which should serve as a model for programs in other…

  1. Photovoltaic energy program overview, fiscal year 1991

    NASA Astrophysics Data System (ADS)

    1992-02-01

    The Photovoltaics Program Plan, FY 1991 to FY 1995 builds on the accomplishments of the past 5 years and broadens the scope of program activities for the future. The previous plan emphasized materials and PV cell research. Under the balanced new plan, the PV Program continues its commitment to strategic research and development (R&D) into PV materials and processes, while also beginning work on PV systems and helping the PV industry encourage new markets for photovoltaics. A major challenge for the program is to assist the US PV industry in laying the foundation for at least 1000 MW of installed PV capacity in the United States and 500 MW internationally by 2000. As part of the new plan, the program expanded the scope of its activities in 1991. The PV Program is now addressing many new aspects of developing and commercializing photovoltaics. It is expanding activities with the US PV industry through the PV Manufacturing Technology (PVMaT) project, designed to address US manufacturers' immediate problems; providing technical assistance to potential end users such as electric utilities; and the program is turning its attention to encouraging new markets for PV. In 1991, for example, the PV Program initiated a new project with the PV industry to encourage a domestic market for PV applications in buildings and began cooperative ventures to support other countries such as Mexico to use PV in their rural electrification programs. This report reviews some of the development, fabrication and manufacturing advances in photovoltaics this year.

  2. A study on the utilization of advanced composites in commercial aircraft wing structure

    NASA Technical Reports Server (NTRS)

    Watts, D. J.

    1978-01-01

    A study was conducted to define the technology and data needed to support the introduction of advanced composite materials in the wing structure of future production aircraft. The study accomplished the following: (1) definition of acceptance factors, (2) identification of technology issues, (3) evaluation of six candidate wing structures, (4) evaluation of five program options, (5) definition of a composite wing technology development plan, (6) identification of full-scale tests, (7) estimation of program costs for the total development plan, (8) forecast of future utilization of composites in commercial transport aircraft and (9) identification of critical technologies for timely program planning.

  3. The Spectrum Orbit Utilization Program (SOUP) used for DBS plan analysis at RARC '83

    NASA Technical Reports Server (NTRS)

    Davidson, J.; Ottey, H. R.; Sawitz, P.; Zusman, F. S.

    1985-01-01

    This paper describes the history, functions, and usage of the program that was used to analyze the plans for direct broadcast satellite service developed in the course of the 1983 Regional Administrative Radio Conference for ITU Region 2. Given the requirements for direct broadcast service by the administrations, the conference delegates (1) developed the appropriate technical parameters; (2) made tentative assignments to the orbit locations, frequencies, and polarizations of space stations, (3) calculated the interferences and margins of such assignments through the use of the Spectrum Orbit Utilization Program (SOUP); and (4) iterated this procedure until an acceptable plan was found.

  4. Successes and problems in family planning administration: experiences in two districts of Kerala, India.

    PubMed

    Valsan, E H

    1977-06-01

    The administrative organizations of the Ernakulam and Malappuram Districts' family planning programs during 1970-74 and the ways they dealt with typical problems of program organization are examined. Lack of personnel, poor staff morale, inadequate supplies, and political and religious opposition to various contraceptive methods, especially sterilization, existed to varying degrees in both districts' programs. The Ernakulam experience, involving mass sterilization camps that were part of an overall district development program, documents the effectiveness of a strong central leader. The Malappuram program illustrates, in contrast, the handicaps of poor areas where development programs were just beginning and administrative resources were overtaxed.

  5. Foundations for Effective School Library Media Programs.

    ERIC Educational Resources Information Center

    Haycock, Ken, Ed.

    This collection of 38 articles, reprinted from "Emergency Librarian," addresses critical elements of school library media program development and implementation, organized by seven areas: foundations; the school context; role clarification; information literacy; collaborative program planning and teaching; program development; and…

  6. Integrated planning for regional development planning and water resources management under uncertainty: A case study of Xining, China

    NASA Astrophysics Data System (ADS)

    Fu, Z. H.; Zhao, H. J.; Wang, H.; Lu, W. T.; Wang, J.; Guo, H. C.

    2017-11-01

    Economic restructuring, water resources management, population planning and environmental protection are subjects to inner uncertainties of a compound system with objectives which are competitive alternatives. Optimization model and water quality model are usually used to solve problems in a certain aspect. To overcome the uncertainty and coupling in reginal planning management, an interval fuzzy program combined with water quality model for regional planning and management has been developed to obtain the absolutely ;optimal; solution in this study. The model is a hybrid methodology of interval parameter programming (IPP), fuzzy programing (FP), and a general one-dimensional water quality model. The method extends on the traditional interval parameter fuzzy programming method by integrating water quality model into the optimization framework. Meanwhile, as an abstract concept, water resources carrying capacity has been transformed into specific and calculable index. Besides, unlike many of the past studies about water resource management, population as a significant factor has been considered. The results suggested that the methodology was applicable for reflecting the complexities of the regional planning and management systems within the planning period. The government policy makers could establish effective industrial structure, water resources utilization patterns and population planning, and to better understand the tradeoffs among economic, water resources, population and environmental objectives.

  7. Transportation technology program: Strategic plan

    NASA Astrophysics Data System (ADS)

    1991-09-01

    The purpose of this report is to define the technology program required to meet the transportation technology needs for current and future civil space missions. It is a part of an integrated plan, prepared by NASA in part in response to the Augustine Committee recommendations, to describe and advocate expanded and more aggressive efforts in the development of advanced space technologies. This expanded program will provide a technology basis for future space missions to which the U.S. aspires, and will help to regain technology leadership for the U.S. on a broader front. The six aspects of this integrated program/plan deal with focused technologies to support space sciences, exploration, transportation, platforms, and operations as well as provide a Research and Technology Base Program. This volume describes the technologies needed to support transportation systems, e.g., technologies needed for upgrades to current transportation systems and to provide reliable and efficient transportation for future space missions. The Office of Aeronautics, Exploration, and Technology (OAET) solicited technology needs from the major agency technology users and the aerospace industry community and formed a transportation technology team (appendix A) to develop a technology program to respond to those needs related to transportation technologies. This report addresses the results of that team activity. It is a strategic plan intended for use as a planning document rather than as a project management tool. It is anticipated that this document will be primarily utilized by research & technology (R&T) management at the various NASA Centers as well as by officials at NASA Headquarters and by industry in planning their corporate Independent Research and Development (IR&D) investments.

  8. Transportation technology program: Strategic plan

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The purpose of this report is to define the technology program required to meet the transportation technology needs for current and future civil space missions. It is a part of an integrated plan, prepared by NASA in part in response to the Augustine Committee recommendations, to describe and advocate expanded and more aggressive efforts in the development of advanced space technologies. This expanded program will provide a technology basis for future space missions to which the U.S. aspires, and will help to regain technology leadership for the U.S. on a broader front. The six aspects of this integrated program/plan deal with focused technologies to support space sciences, exploration, transportation, platforms, and operations as well as provide a Research and Technology Base Program. This volume describes the technologies needed to support transportation systems, e.g., technologies needed for upgrades to current transportation systems and to provide reliable and efficient transportation for future space missions. The Office of Aeronautics, Exploration, and Technology (OAET) solicited technology needs from the major agency technology users and the aerospace industry community and formed a transportation technology team (appendix A) to develop a technology program to respond to those needs related to transportation technologies. This report addresses the results of that team activity. It is a strategic plan intended for use as a planning document rather than as a project management tool. It is anticipated that this document will be primarily utilized by research & technology (R&T) management at the various NASA Centers as well as by officials at NASA Headquarters and by industry in planning their corporate Independent Research and Development (IR&D) investments.

  9. Developing clinical leadership capability.

    PubMed

    Pintar, Kristi A; Capuano, Terry A; Rosser, Gwendolyn D

    2007-01-01

    Nursing facilities must be committed to ongoing leadership development and to developing and retaining their staff in the increasingly competitive healthcare market. In this article, the authors share the processes involved in creating a focused small group approach to developing clinical leaders. Programmatic approaches to development, clarity of needs of those targeted for development, individual development plans, external expertise partnerships, and small group session dynamics are discussed. Applications of the process and lessons learned from the program will benefit others in their efforts to enhance organization succession planning, leadership development, group learning, and program administration.

  10. Site scientific mission plan for the Southern Great Plains CART site, January-June 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schneider, J.M.; Lamb, P.J.; Sisterson, D.L.

    1994-12-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on January 1, 1995, and also looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Experiment Support Team [EST], Operations Team, Data Management Teammore » [DMT], Instrument Team [IT], and Campaign Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary envisaged site activities, together with information concerning approved and proposed Intensive Observation Periods (IOPs). Amendments will be prepared and distributed whenever the content changes by more than 30% within a six-month period. The primary users of this document are the site operator, the site scientist, the Science Team through the ARM Program Science Director, The ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that will be updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.« less

  11. A Model Curriculum and Program for Preretirement Planning Courses. NCCSCE Working Paper Series.

    ERIC Educational Resources Information Center

    Wilson, Gary W.; Oerke, George W.

    Intended to assist continuing education professionals in the planning and implementation of local preretirement training programs, this paper provides information on Edison State Community College's program, developed for use by industrial, commercial, and public agency employees and the general public. First, an overview is presented of the…

  12. A Guide for Developing the Instructional Program in Agricultural Mechanics.

    ERIC Educational Resources Information Center

    Illinois State Board of Vocational Education and Rehabilitation, Springfield. Div. of Vocational and Technical Education.

    This bulletin contains materials suggested for use by agricultural teachers in the improvement of their agricultural mechanics programs. In its function as a guide to planning a teaching program in agricultural mechanics the document outlines the principles and procedures in course planning, 12 guiding concepts in the teaching of agricultural…

  13. Reflective Lesson Planning in Refresher Training Programs for Experienced Physics Teachers.

    ERIC Educational Resources Information Center

    Chung, C. M.; And Others

    1995-01-01

    Reports on a refresher training program that introduces experienced physics teachers to a reflective lesson-planning model and a more constructivist approach to physics teaching. Three instructional strategies developed by participants in the program and the corresponding suggestions made by their peers are presented and analyzed. (29 references)…

  14. IEC planning: eight state-of-the-art principles.

    PubMed

    Middleton, J

    1983-12-01

    Considerable experience and research has been accumulated in the last 20 years on the ways in which information/education/communication (IEC) programs can be effectively designed, implemented, and evaluated. Possibly more effort has focused on population and family planning IEC than on any other sectoral program of development communication. Several principles have emerged which, taken together, define the state of the art in the field. These principles provide a framework of experience which can guide the development of comprehensive IEC programs. They include: policy and resource assessment; audience analysis; strategy design; message research and pretesting; participation and feedback; management; evaluation; and collaboration. The nature of the national policy base for population and family planning programs will determine the goals and approaches of the IEC program. Strong policies of limitation on popultion growth lead to equally strong and pervasive IEC efforts designed to directly affect contraceptive behavior. Assessment of existing policy is an essential aspect of the design of an effective IEC program. Policies establish the rationale and boundaries for action. Population and family planning programs are concerned with some of the most intimate human behavior. Consequently, structured and sensitive audience analysis has become an integral part of the design of IEC programs. The design of communication strategy requires clearly stated objectives. Principles of human learning are used to structure information appropriately. Message research and pretesting have become integral components of the strategy design process. Small scale research on specific objectives is necessary to establish the basis for message design. Audience participation and feedback in remaining phases of program development and implementation are important. The management of an IEC program requires a specific combination of planning, flexibility, and creativity. Evaluation of program effects--identification of the degree of change toward stated objectives -- is critical to long term assessment of the underlying strategy and the identification both of needed corrections and new directions for the future. Collaboration with and involvement of stakeholders in the design and implementation of a national IEC program significantly raises the probability that support will be forthcoming. Taken together these 8 principles can become the basic building blocks of an effective population/family planning IEC program.

  15. Empowering people. Alleviating poverty through self-sufficiency.

    PubMed

    Nahariya, R

    1993-03-01

    Highlights from an interview with Benjamin D. de Leon, who was appointed Presidential Assistant for Social Development in the Philippines in September 1992, are presented. Mr. de Leon's concern for the marginal sectors of society in health, employment, housing, social welfare, and manpower training as well as his goals of poverty alleviation and people empowerment account for this appointment. Duties include formulating a social development agenda; assisting the Social Development Committee of the Cabinet and the National Economic Development Authority (NEDA) in program implementation; and providing weekly information packages about family planning (FP), health, children, women, and the environment. The social development agenda of the Philippine Medium-term Plan (1992-1998) includes employment, income, wages; population, health and nutrition, and family planning; and housing, education, manpower development, social welfare, and community development. The Plan recognizes that poverty is aggravated by rapid population growth, and it strives to ensure that adolescents, military males, high-risk women, and young unmarried couples receive FP information and services from government agencies and nongovernmental organizations. Adequate resources for population and FP as well as recognizing the relationship among population, resources, and the environment are essential to meet the goals of the plan. The present population and FP policy is based on the 1987 Constitution, which spells out responsible parenthood but also rejects abortion as a method of contraception. The official FP program calls for child survival and safe motherhood and accessible, available, and affordable FP services. The Roman Catholic Church opposes the program, since the Church promotes only the rhythm method, but the other religions approve of the program. Some priests and nuns did not object to the promotion of FP. Sufficient financial support from the international community for the Philippine Population and Family Planning Program would also help realize the aspiration that all Filipino children be wanted by their parents and grow up with a sense of discipline and love of country.

  16. Personal transportation plan pilot program phase 1 : exploring the transportation behaviors and needs of veterans and people with physical disabilities and mobility constraints.

    DOT National Transportation Integrated Search

    2017-06-01

    This report summarizes the initial phase of the Personal Transportation Plan Pilot Program (PTP3). The purpose of the PTP3 initiative is to develop a personal transportation planning tool that can be used by disabled Vermonters and Vermont veterans t...

  17. Preservation Planning Program. Study Report. Iowa State University Library. Final Report.

    ERIC Educational Resources Information Center

    Galejs, John; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Iowa State University, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing plans and procedures for preserving…

  18. Farmers and Bankers Are Interested in F.B.P.A. (Farm Business Planning and Analysis)

    ERIC Educational Resources Information Center

    Borton, John L.

    1974-01-01

    A successful Farm Business Planning and Analysis program is being taught by the Upper Sandusky, Ohio, Vocational Agriculture Department fo farm operators, farm couples, bankers, and vocational agriculture teachers and students. The F.B.P.A. program consists of developing a record system, summarizing and analyzing the system, and planning future…

  19. Models and Procedures for Improving the Planning, Management, and Evaluation of Cooperative Education Programs. Final Report. Volume I.

    ERIC Educational Resources Information Center

    Blaschke, Charles L.; Steiger, JoAnn

    This report of a project to design a set of training guidelines for planning, managing, and evaluating cooperative education programs describes briefly the procedures used in developing the guidelines and model; discusses the various components of the planning, management, and evaluation process; and presents guidelines and criteria for designing…

  20. Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts asmore » a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.« less

  1. [Evaluation of the implementation of reproductive health services in Maringá, Paraná State, Brazil].

    PubMed

    Nagahama, Elizabeth Eriko Ishida

    2009-01-01

    The aim of this study was to develop a tool to evaluate the implementation of a contraceptive program in health services and apply it to the 23 public health services in Maringá, Paraná State, Brazil. A theoretical-logical model was developed, corresponding to a 'target image' for the family planning program. Using the Delphi technique and consensus conference, six experts validated the program's target image, which included three dimensions and 60 evaluation criteria. A data collection instrument was prepared, in addition to a spreadsheet to evaluate the degree of the family planning program's implementation, constituting the Questionnaire for the Evaluation of Reproductive Health Services. The vast majority of the primary health units (91.3%) received an 'intermediate' score on implementation of the family planning program, while 8.7% were classified as 'incipient' and none were scored as 'advanced'. The 'advanced' degree of implementation in the structural dimension contrasted with the organizational and patient care dimensions. The instrument can be useful for evaluating reproductive health programs and is applicable to the health services planning and management processes.

  2. 7 CFR 1210.331 - Programs and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE WATERMELON RESEARCH AND PROMOTION PLAN Watermelon Research and Promotion Plan Research and Promotion § 1210.331 Programs and... to maintain, develop, and expand markets for watermelon; (b) Establishing and carrying out research...

  3. 7 CFR 1210.331 - Programs and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE WATERMELON RESEARCH AND PROMOTION PLAN Watermelon Research and Promotion Plan Research and Promotion § 1210.331 Programs and... to maintain, develop, and expand markets for watermelon; (b) Establishing and carrying out research...

  4. 7 CFR 1210.331 - Programs and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE WATERMELON RESEARCH AND PROMOTION PLAN Watermelon Research and Promotion Plan Research and Promotion § 1210.331 Programs and... to maintain, develop, and expand markets for watermelon; (b) Establishing and carrying out research...

  5. 7 CFR 1210.331 - Programs and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE WATERMELON RESEARCH AND PROMOTION PLAN Watermelon Research and Promotion Plan Research and Promotion § 1210.331 Programs and... to maintain, develop, and expand markets for watermelon; (b) Establishing and carrying out research...

  6. 40 CFR 35.160 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... also be eligible for funding under sections 104(b)(3) (Water Quality Cooperative Agreements and Wetlands Development Grants), 205(j)(2) (Water Quality Management Planning), and section 205(g) (State...) Associated program requirements. Program requirements for water quality planning and management activities...

  7. Path to a Research Plan

    NASA Technical Reports Server (NTRS)

    Chiaramonte, Fran

    2003-01-01

    This viewgraph presentation discusses the status and goals for the NASA OBPR Physical Science Research Program. The following text was used to summarize the presentation. The OBPR Physical Sciences Research program has been comprehensively reviewed and endorsed by National Research Council. The value and need for the research have been re-affirmed. The research program has been prioritized and resource re-allocations have been carried out through an OBPR-wide process. An increasing emphasis on strategic, mission-oriented research is planned. The program will strive to maintain a balance between strategic and fundamental research. A feasible ISS flight research program fitting within the budgetary and ISS resource envelopes has been formulated for the near term (2003-2007). The current ISS research program will be significantly strengthened starting 2005 by using discipline dedicated research facility racks. A research re-planning effort has been initiated and will include active participation from the research community in the next few months. The research re-planning effort will poise PSR to increase ISS research utilization for a potential enhancement beyond ISS IP Core Complete. The Physical Sciences research program readily integrates the cross-disciplinary requirements of the NASA and OBPR strategic objectives. Each fundamental research thrust will develop a roadmap through technical workshops and Discipline Working Groups (DWGs). Most fundamental research thrusts will involve cross-disciplinary efforts. A Technology Roadmap will guide the Strategic Research for Exploration thrust. The Research Plan will integrate and coordinate fundamental Research Thrusts Roadmaps with the Technology Roadmap. The Technology Roadmap will be developed in coordination with other OBPR programs as well as other Enterprise (R,S,M,N). International Partners will contribute to the roadmaps and through research coordination. The research plan will be vetted with the discipline working groups, the BPRAC subcommittees, and with the BPRAC. Recommendations from NRC past and current committees will be implemented whenever appropriate.Proposed theme element content will be "missionized" around planned content and potential new projects (facilities, modules, initiatives) on approximately a five-year horizon, with the approval of PSRD management. Center/science working group teams will develop descriptions of "mission" objectives, value, and requirements. Purpose is to create a competitive environment for concept development and to stimulate community ownership/advocacy. Proposed theme elements reviewed and approved by PSRD management. Strawman roadmaps for themes developed. Program budget and technology requirements verified. Theme elements are prioritized with the input of advisory groups. Integration into program themes (questions) and required technology investments are defined by science and technology roadmaps. Review and assessment by OBPR management.

  8. Achieving Success in Small Business. A Self-Instruction Program for Small Business Owner-Managers. Developing Your Sales Promotion Plan.

    ERIC Educational Resources Information Center

    Virginia Polytechnic Inst. and State Univ., Blacksburg. Div. of Vocational-Technical Education.

    This self-instructional module on developing your sales promotion plan is the fifth in a set of twelve modules designed for small business owner-managers. Competencies for this module are (1) describe the role of advertising, display, and personal selling in a sales promotion plan and (2) develop an effective sales promotion plan which…

  9. Repository-based software engineering program: Concept document

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This document provides the context for Repository-Based Software Engineering's (RBSE's) evolving functional and operational product requirements, and it is the parent document for development of detailed technical and management plans. When furnished, requirements documents will serve as the governing RBSE product specification. The RBSE Program Management Plan will define resources, schedules, and technical and organizational approaches to fulfilling the goals and objectives of this concept. The purpose of this document is to provide a concise overview of RBSE, describe the rationale for the RBSE Program, and define a clear, common vision for RBSE team members and customers. The document also provides the foundation for developing RBSE user and system requirements and a corresponding Program Management Plan. The concept is used to express the program mission to RBSE users and managers and to provide an exhibit for community review.

  10. Risk management in international manned space program operations.

    PubMed

    Seastrom, J W; Peercy, R L; Johnson, G W; Sotnikov, B J; Brukhanov, N

    2004-02-01

    New, innovative joint safety policies and requirements were developed in support of the Shuttle/Mir program, which is the first phase of the International Space Station program. This work has resulted in a joint multinational analysis culminating in joint certification for mission readiness. For these planning and development efforts, each nation's risk programs and individual safety practices had to be integrated into a comprehensive and compatible system that reflects the joint nature of the endeavor. This paper highlights the major incremental steps involved in planning and program integration during development of the Shuttle/Mir program. It traces the transition from early development to operational status and highlights the valuable lessons learned that apply to the International Space Station program (Phase 2). Also examined are external and extraneous factors that affected mission operations and the corresponding solutions to ensure safe and effective Shuttle/Mir missions. c2003 Published by Elsevier Ltd.

  11. Strategic planning in an academic radiation medicine program.

    PubMed

    Hamilton, J L; Foxcroft, S; Moyo, E; Cooke-Lauder, J; Spence, T; Zahedi, P; Bezjak, A; Jaffray, D; Lam, C; Létourneau, D; Milosevic, M; Tsang, R; Wong, R; Liu, F F

    2017-12-01

    In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations.

  12. Strategic planning in an academic radiation medicine program

    PubMed Central

    Hamilton, J.L.; Foxcroft, S.; Moyo, E.; Cooke-Lauder, J.; Spence, T.; Zahedi, P.; Bezjak, A.; Jaffray, D.; Lam, C.; Létourneau, D.; Milosevic, M.; Tsang, R.; Wong, R.; Liu, F.F.

    2017-01-01

    Background In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Methods Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. Results The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. Conclusions The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations. PMID:29270061

  13. 40 CFR 52.63 - PM10 State Implementation Plan development in group II areas.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... development in group II areas. 52.63 Section 52.63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alabama § 52.63 PM10 State Implementation Plan development in group II areas. On March 15, 1989, the State submitted a...

  14. 40 CFR 52.881 - PM10 State implementation plan development in group II areas.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... development in group II areas. 52.881 Section 52.881 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Kansas § 52.881 PM10 State implementation plan development in group II areas. The state has submitted a committal SIP for...

  15. 40 CFR 52.63 - PM10 State Implementation Plan development in group II areas.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... development in group II areas. 52.63 Section 52.63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alabama § 52.63 PM10 State Implementation Plan development in group II areas. On March 15, 1989, the State submitted a...

  16. 40 CFR 52.63 - PM10 State Implementation Plan development in group II areas.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... development in group II areas. 52.63 Section 52.63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alabama § 52.63 PM10 State Implementation Plan development in group II areas. On March 15, 1989, the State submitted a...

  17. 40 CFR 52.935 - PM10 State implementation plan development in group II areas.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... development in group II areas. 52.935 Section 52.935 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Kentucky § 52.935 PM10 State implementation plan development in group II areas. On July 7, 1988, the State submitted a...

  18. 40 CFR 52.935 - PM10 State implementation plan development in group II areas.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... development in group II areas. 52.935 Section 52.935 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Kentucky § 52.935 PM10 State implementation plan development in group II areas. On July 7, 1988, the State submitted a...

  19. 40 CFR 52.935 - PM10 State implementation plan development in group II areas.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... development in group II areas. 52.935 Section 52.935 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Kentucky § 52.935 PM10 State implementation plan development in group II areas. On July 7, 1988, the State submitted a...

  20. 40 CFR 52.881 - PM10 State implementation plan development in group II areas.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... development in group II areas. 52.881 Section 52.881 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Kansas § 52.881 PM10 State implementation plan development in group II areas. The state has submitted a committal SIP for...

  1. 40 CFR 52.935 - PM10 State implementation plan development in group II areas.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... development in group II areas. 52.935 Section 52.935 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Kentucky § 52.935 PM10 State implementation plan development in group II areas. On July 7, 1988, the State submitted a...

  2. 40 CFR 52.881 - PM10 State implementation plan development in group II areas.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... development in group II areas. 52.881 Section 52.881 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Kansas § 52.881 PM10 State implementation plan development in group II areas. The state has submitted a committal SIP for...

  3. 40 CFR 52.881 - PM10 State implementation plan development in group II areas.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... development in group II areas. 52.881 Section 52.881 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Kansas § 52.881 PM10 State implementation plan development in group II areas. The state has submitted a committal SIP for...

  4. 40 CFR 52.63 - PM10 State Implementation Plan development in group II areas.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... development in group II areas. 52.63 Section 52.63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alabama § 52.63 PM10 State Implementation Plan development in group II areas. On March 15, 1989, the State submitted a...

  5. 40 CFR 52.63 - PM10 State Implementation Plan development in group II areas.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... development in group II areas. 52.63 Section 52.63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alabama § 52.63 PM10 State Implementation Plan development in group II areas. On March 15, 1989, the State submitted a...

  6. 40 CFR 52.881 - PM10 State implementation plan development in group II areas.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... development in group II areas. 52.881 Section 52.881 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Kansas § 52.881 PM10 State implementation plan development in group II areas. The state has submitted a committal SIP for...

  7. 40 CFR 52.935 - PM10 State implementation plan development in group II areas.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... development in group II areas. 52.935 Section 52.935 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Kentucky § 52.935 PM10 State implementation plan development in group II areas. On July 7, 1988, the State submitted a...

  8. Selenide isotope generator for the Galileo mission. Reliability program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-10-01

    The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineatedmore » herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work.« less

  9. New development of China's population programme.

    PubMed

    Peng, P

    1998-06-01

    This article presents excerpts of a speech presented by the State Family Planning Commissioner of China at the UNFPA headquarters. Madame Peng Peiyun indicated that China has adopted some new decision-making processes as a follow-up to the 1994 ICPD Plan of Action. President Jiang Zemin stated that sustainable development must be achieved as part of the movement toward modernization. China places great importance on balancing population growth, social production, economic development, resources, and the environment. In 1995, the State Family Planning Commission changed its guidelines and approaches by integrating family planning (FP) within socioeconomic development and shifting to an interest oriented program integrated with social restraints and integrating FP publicity and education with comprehensive services and modern management. The FP program should meet the needs for reproductive health and contraception and be integrated within poverty alleviation and economic development schemes in rural areas. The aim is to build happy and more civil-minded farming families. Attention should be directed to the interests of farmers and the physical and psychological health of women. Programs should be voluntary. Many poverty reduction programs operated in the early 1990s. Pilot programs were established in 1995, in 11 selected counties and urban districts. The aim was to improve grassroots efforts to meet clients' needs for quality reproductive health and contraception. In 1994, providers received upgrading of skills. As the most populous country in the world, China needs UNFPA support in stabilizing population growth.

  10. Planning Complex Projects Automatically

    NASA Technical Reports Server (NTRS)

    Henke, Andrea L.; Stottler, Richard H.; Maher, Timothy P.

    1995-01-01

    Automated Manifest Planner (AMP) computer program applies combination of artificial-intelligence techniques to assist both expert and novice planners, reducing planning time by orders of magnitude. Gives planners flexibility to modify plans and constraints easily, without need for programming expertise. Developed specifically for planning space shuttle missions 5 to 10 years ahead, with modifications, applicable in general to planning other complex projects requiring scheduling of activities depending on other activities and/or timely allocation of resources. Adaptable to variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction.

  11. Strategic implementation plan

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The Life Science Division of the NASA Office of Space Science and Applications (OSSA) describes its plans for assuring the health, safety, and productivity of astronauts in space, and its plans for acquiring further fundamental scientific knowledge concerning space life sciences. This strategic implementation plan details OSSA's goals, objectives, and planned initiatives. The following areas of interest are identified: operational medicine; biomedical research; space biology; exobiology; biospheric research; controlled ecological life support; flight programs and advance technology development; the life sciences educational program; and earth benefits from space life sciences.

  12. Animal Resource Program | Center for Cancer Research

    Cancer.gov

    CCR Animal Resource Program The CCR Animal Resource Program plans, develops, and coordinates laboratory animal resources for CCR’s research programs. We also provide training, imaging, and technology development in support of moving basic discoveries to the clinic. The ARP Office:

  13. Animal Resource Program | Center for Cancer Research

    Cancer.gov

    CCR Animal Resource Program The CCR Animal Resource Program plans, develops, and coordinates laboratory animal resources for CCR’s research programs. We also provide training, imaging, and technology development in support of moving basic discoveries to the clinic. The ARP Manager:

  14. Guidelines for development : Transportation Improvement Programs (TIPs) and the Iowa Statewide Transportation Improvement Program (STIP).

    DOT National Transportation Integrated Search

    2011-02-01

    This document serves as a reference guide to local planning agencies for the development of their regional Transportation Improvement Program (TIP) and the Statewide Transportation Improvement Program (STIP). Any questions regarding content or relati...

  15. 24 CFR 91.10 - Consolidated program year.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Consolidated program year. 91.10 Section 91.10 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS General § 91.10...

  16. Development of an automated pre-sampling plan for construction projects : final report.

    DOT National Transportation Integrated Search

    1983-03-01

    The development of an automated pre-sampling plan was undertaken to free the district construction personnel from the cumbersome and time-consuming task of preparing such plans manually. A computer program was written and linked to a data file which ...

  17. The Melwood Manual: A Planning and Operations Manual for Horticultural Training and Work Co-op Programs.

    ERIC Educational Resources Information Center

    Melwood Horticultural Training Center, Inc., Upper Marlboro, MD.

    This manual is intended as a resource for anyone involved in planning, developing, and/or operating a horticultural training or work co-op program for the handicapped. Following an introductory chapter, the manual is divided into three parts with the greatest weight given to the second part. Part I elaborates on development of the horticulture…

  18. County Clustering for the California 4-H Youth Development Program: Impacts and Lessons Learned

    ERIC Educational Resources Information Center

    Subramaniam, Aarti; Dasher, Harry Steve; Young, Jane Chin

    2012-01-01

    In response to budgetary constraints, a new staffing structure, the Pilot Leadership Plan, was proposed for California's 4-H Youth Development Program. County clusters were formed, each led by a coordinator. The plan was piloted for 2 years to provide insight into how county clustering could support Extension staff to increase and enhance program…

  19. PROCEEDINGS OF NATIONAL SEMINAR ON PROGRAM PLANNING, BUDGETING AND EVALUATION, VOCATIONAL-TECHNICAL EDUCATION. FINAL REPORT.

    ERIC Educational Resources Information Center

    CONNOLLY, JOHN; SMITH, CLODUS R.

    THIRTY-NINE FEDERAL AND STATE EDUCATORS FROM 33 STATES, 23 RESOURCE PERSONNEL, AND 15 STAFF AND CHAIRMEN PARTICIPATED IN A SEMINAR TO (1) DEVELOP INSIGHTS INTO THE PRINCIPLES AND PROCESS OF PROGRAM PLANNING, BUDGETING, AND EVALUATION, (2) INVOLVE STATE, REGIONAL, AND LOCAL STAFF MEMBERS, (3) DEVELOP A CADRE OF KNOWLEDGEABLE VOCATIONAL EDUCATORS,…

  20. Leaders in Education Program: The Singapore Model for Developing Effective Principal-Ship Capability

    ERIC Educational Resources Information Center

    Jayapragas, Prashant

    2016-01-01

    In this era of constant change, principals need to be able to handle high levels of complexity in its governance and policy implementation. Planning ahead is not sufficient; being able to interpret and plan the future into strategic responses is a huge focus in educational development today. The Leaders in Education Program (LEP) is a 6-month…

  1. International Academy of Astronautics 5th cosmic study--preparing for a 21st century program of integrated, Lunar and Martian exploration and development (executive summary).

    PubMed

    Koelle, H H; Stephenson, D G

    2003-04-01

    This report is an initial review of plans for a extensive program to survey and develop the Moon and to explore the planet Mars during the 21st century. It presents current typical plans for separate, associated and fully integrated programs of Lunar and Martian research, exploration and development, and concludes that detailed integrated plans must be prepared and be subject to formal criticism. Before responsible politicians approve a new thrust into space they will demand attractive, defensible, and detailed proposals that explain the WHEN, HOW and WHY of each stage of an expanded program of 21st century space research, development and exploration. In particular, the claims of daring, innovative, but untried systems must be compared with the known performance of existing technologies. The time has come to supersede the present haphazard approach to strategic space studies with a formal international structure to plan for future advanced space missions under the aegis of the world's national space agencies, and supported by governments and the corporate sector. c2002 Elsevier Science Ltd. All rights reserved.

  2. Development of a multihospital pharmacy quality assurance program.

    PubMed

    Hoffmann, R P; Ravin, R; Colaluca, D M; Gifford, R; Grimes, D; Grzegorczyk, R; Keown, F; Kuhr, F; McKay, R; Peyser, J; Ryan, R; Zalewski, C

    1980-07-01

    Seven community hospitals have worked cooperatively for 18 months to develop an initial hospital pharmacy quality assurance program. Auditing criteria were developed for nine service areas corresponding to the model program developed by the American Society of Hospital Pharmacists. Current plans are to implement and modify this program as required at each participating hospital. Follow-up programs will also be essential to a functional, ongoing program, and these will be developed in the future.

  3. [Preventing maternal and child malnutrition: the nutrition component of the Mesoamerican Health Initiative 2015].

    PubMed

    Rivera, Juan A; Martorell, Reynaldo; González, Wendy; Lutter, Chessa; Cossío, Teresa González de; Flores-Ayala, Rafael; Uauy, Ricardo; Delgado, Hernán

    2011-01-01

    To describe the regional master plan of nutrition to address maternal and child malnutrition in a 5- year period developed by the Nutrition Technical Group. The Nutrition Technical Group developed a situation analysis describing the main nutrition problems, policies and programs in Mesoamerica. The situation analysis and a literature review about effective interventions to address malnutrition were conducted to develop a nutrition master plan. The Nutrition Technical Group held various meetings to develop, discuss and validate the master plan. Theory of change identified problems and barriers, the actions to be developed, the changes and impacts expected. A package of interventions is proposed to reduce undernutrition and micronutrient deficiencies useful under different epidemiological contexts. The nutrition master plan provides a guideline of best practices that can be used for evidence-informed decision making and the development of national policies and programs to reduce malnutrition.

  4. Meet EPA Scientist Sherri Hunt, Ph.D.

    EPA Pesticide Factsheets

    Dr. Sherri Hunt is the Assistant Center Director for the Air, Climate, and Energy (ACE) Research Program. She plays an active leadership role in the ACE program planning and coordination and was a key author for the Research Action Plan development

  5. 40 CFR 35.9010 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9010 Definitions. Aggregate costs. The... the estuary. Annual work plan. The plan, developed by the Management Conference each year, which... an estuary in the NEP. National Program Assistance Agreements. Assistance Agreements approved by the...

  6. 40 CFR 35.9010 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9010 Definitions. Aggregate costs. The... the estuary. Annual work plan. The plan, developed by the Management Conference each year, which... an estuary in the NEP. National Program Assistance Agreements. Assistance Agreements approved by the...

  7. 40 CFR 35.9010 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9010 Definitions. Aggregate costs. The... the estuary. Annual work plan. The plan, developed by the Management Conference each year, which... an estuary in the NEP. National Program Assistance Agreements. Assistance Agreements approved by the...

  8. 40 CFR 35.9010 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9010 Definitions. Aggregate costs. The... the estuary. Annual work plan. The plan, developed by the Management Conference each year, which... an estuary in the NEP. National Program Assistance Agreements. Assistance Agreements approved by the...

  9. 40 CFR 35.9010 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9010 Definitions. Aggregate costs. The... the estuary. Annual work plan. The plan, developed by the Management Conference each year, which... an estuary in the NEP. National Program Assistance Agreements. Assistance Agreements approved by the...

  10. Beneficial Uses of Dredged Material Case Study: San Francisco Bay Region

    EPA Pesticide Factsheets

    A major interagency, regional planning effort led to the development of the Long-Term Management Strategy and other planning programs in the San Francisco Bay area. These programs incorporate beneficial uses of dredged material into local projects.

  11. 7 CFR 1940.959 - Area plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) GENERAL System for Delivery of Certain Rural Development Programs § 1940.959 Area plan...

  12. 7 CFR 1940.959 - Area plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) GENERAL System for Delivery of Certain Rural Development Programs § 1940.959 Area plan...

  13. 7 CFR 1940.959 - Area plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) GENERAL System for Delivery of Certain Rural Development Programs § 1940.959 Area plan...

  14. 7 CFR 1940.959 - Area plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) GENERAL System for Delivery of Certain Rural Development Programs § 1940.959 Area plan...

  15. Space station systems technology study (add-on task). Volume 3: Technology advancement program plan

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Program plans are given for an integrating controller for space station autonomy as well as for controls and displays. The technical approach, facility requirements and candidate facilities, development schedules, and resource requirements estimates are given.

  16. Educational Planning for the Future Development of Pasco-Hernando Community College.

    ERIC Educational Resources Information Center

    McGuffey, C. W.; And Others

    The purpose of this study was to develop a long-range educational plan for the future development and expansion of the current program and facilities of Pasco-Hernando Community College. An analysis has been made of available data and related information as a basis for the preparation of a generalized plan to guide the future development of the…

  17. A planning model for expansion and stagnation of higher education in Iran.

    PubMed

    Mohammadi, Aeen; Mojtahedzadeh, Rita; Saadat, Soheil; Karimi, Abdollah; Keshavarz Valian, Hossein

    2014-01-01

    Iran universities of medical sciences have experienced a period of expansion in past decades. Now previous concerns are alleviated, and the former quantity-based policy has given a way to a more quality-seeking attitude. In this study, we developed a planning model for expansion and stagnation of higher education in Iranian universities of medical sciences based on workforce requirements of the country and capabilities of the universities. The plan provided an objectively documented base for the authorities to decide on developmental limits of universities. We devised guidelines for justifying existing programs within universities, assigning new undergraduate and postgraduate programs to universities, voluntary request of universities to cancel a program, and their request to offer new programs for the first time in the country, based on three factors: university educational status, each university-program educational status and the nation's need for each discipline. Related councils of the Ministry of Health and Medical Education legitimately approved the plan and guidelines. In this article, we introduced the methodology of developing the plan, described it and its related guidelines and discussed challenges and limitations we encountered in design and application phases.

  18. The Portfolio Approach Developed to Underpin the Capital Investment Program Plan Review (CIPPR)

    DTIC Science & Technology

    2014-11-06

    Basinger, Director, DCI, CFD Scientific Letter The PORTFOLIO APPROACH developed to underpin the Capital Investment Program Plan Review (CIPPR) To better...prepare senior management for meetings about CIPPR in November 2014, this scientific letter has been pre- pared upon request [1] to clarify some of...Research and Analysis in support of CIPPR was to: 1. Provide scientific support to the development of a traceable and sustainable approach and process by

  19. Integrating telemedicine and telehealth: putting it all together.

    PubMed

    Weinstein, Ronald S; Lopez, Ana Maria; Krupinski, Elizabeth A; Beinar, Sandra J; Holcomb, Michael; McNeely, Richard A; Latifi, Rifat; Barker, Gail

    2008-01-01

    Telemedicine and telehealth programs are inherently complex compared with their traditional on-site health care delivery counterparts. Relatively few organizations have developed sustainable, multi-specialty telemedicine programs, although single service programs, such as teleradiology and telepsychiatry programs, are common. A number of factors are barriers to the development of sustainable telemedicine and telehealth programs. First, starting programs is often challenging since relatively few organizations have, in house, a critical mass of individuals with the skill sets required to organize and manage a telemedicine program. Therefore, it is necessary to "boot strap" many of the start-up activities using available personnel. Another challenge is to assemble a management team that has time to champion telemedicine and telehealth while dealing with the broad range of issues that often confront telemedicine programs. Telemedicine programs housed within a single health care delivery system have advantages over programs that serve as umbrella telehealth organizations for multiple health care systems. Planning a telemedicine program can involve developing a shared vision among the participants, including the parent organizations, management, customers and the public. Developing shared visions can be a time-consuming, iterative process. Part of planning includes having the partnering organizations and their management teams reach a consensus on the initial program goals, priorities, strategies, and implementation plans. Staffing requirements of telemedicine and telehealth programs may be met by sharing existent resources, hiring additional personnel, or outsourcing activities. Business models, such as the Application Service Provider (ASP) model used by the Arizona Telemedicine Program, are designed to provide staffing flexibility by offering a combination of in-house and out-sourced services, depending on the needs of the individual participating health care organizations. Telemedicine programs should perform ongoing assessments of activities, ranging from service usage to quality of service assessments, to ongoing analyses of financial performance. The financial assessments should include evaluations of costs and benefits, coding issues, reimbursement, account receivables, bad debt and network utilization. Long-range strategic planning for a telemedicine and telehealth program should be carried out on an on-going basis and should include the program's governing board. This planning process should include goal setting and the periodic updating of the program's vision and mission statements. There can be additional special issues for multi-organization telemedicine and telehealth programs. For example, authority management can require the use of innovative approaches tailored to the realities of the organizational structures of the participating members. Inter-institutional relations may introduce additional issues when competing health care organizations are utilizing shared resources. Branding issues are preferably addressed during the initial planning of a multi-organizational telemedicine and telehealth program. Ideally, public policy regarding telemedicine and telehealth within a service region will complement the objectives of telemedicine and telehealth programs within that service area.

  20. Overview of DOE-NE Proliferation and Terrorism Risk Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sadasivan, Pratap

    2012-08-24

    Research objectives are: (1) Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of current reactors; (2) Develop improvements in the affordability of new reactors to enable nuclear energy; (3) Develop Sustainable Nuclear Fuel Cycles; and (4) Understand and minimize the risks of nuclear proliferation and terrorism. The goal is to enable the use of risk information to inform NE R&D program planning. The PTRA program supports DOE-NE's goal of using risk information to inform R&D program planning. The FY12 PTRA program is focused on terrorism risk. The program includes a mixmore » of innovative methods that support the general practice of risk assessments, and selected applications.« less

  1. Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)

    NASA Technical Reports Server (NTRS)

    Niewoehner, Kevin R.; Carter, John (Technical Monitor)

    2001-01-01

    The research accomplishments for the cooperative agreement 'Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)' include the following: (1) previous IFC program data collection and analysis; (2) IFC program support site (configured IFC systems support network, configured Tornado/VxWorks OS development system, made Configuration and Documentation Management Systems Internet accessible); (3) Airborne Research Test Systems (ARTS) II Hardware (developed hardware requirements specification, developing environmental testing requirements, hardware design, and hardware design development); (4) ARTS II software development laboratory unit (procurement of lab style hardware, configured lab style hardware, and designed interface module equivalent to ARTS II faceplate); (5) program support documentation (developed software development plan, configuration management plan, and software verification and validation plan); (6) LWR algorithm analysis (performed timing and profiling on algorithm); (7) pre-trained neural network analysis; (8) Dynamic Cell Structures (DCS) Neural Network Analysis (performing timing and profiling on algorithm); and (9) conducted technical interchange and quarterly meetings to define IFC research goals.

  2. Research and development program plan for the Center for Engineering Systems Advanced Research (CESAR)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weisbin, C.R.; Hamel, W.R.; Barhen, J.

    1986-02-01

    The Oak Ridge National Laboratory has established the Center for Engineering Systems Advanced Research (CESAR) for the purpose of addressing fundamental problems of intelligent machine technologies. The purpose of this document is to establish a framework and guidelines for research and development within ORNL's CESAR program in areas pertaining to intelligent machines. The specific objective is to present a CESAR Research and Development Plan for such work with a planning horizon of five to ten years, i.e., FY 1985 to FY 1990 and beyond. As much as possible, the plan is based on anticipated DOE needs in the area ofmore » productivity increase and safety to the end of this century.« less

  3. Orbital Express Mission Operations Planning and Resource Management using ASPEN

    NASA Technical Reports Server (NTRS)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Danny

    2008-01-01

    The Orbital Express satellite servicing demonstrator program is a DARPA program aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consists of: a) the Autonomous Space Transport Robotic Operations (ASTRO) vehicle, under development by Boeing Integrated Defense Systems, and b) a prototype modular next-generation serviceable satellite, NEXTSat, being developed by Ball Aerospace. Flexibility of ASPEN: a) Accommodate changes to procedures; b) Accommodate changes to daily losses and gains; c) Responsive re-planning; and d) Critical to success of mission planning Auto-Generation of activity models: a) Created plans quickly; b) Repetition/Re-use of models each day; and c) Guarantees the AML syntax. One SRP per day vs. Tactical team

  4. An annual employee education calendar as the capstone of educational assessment, planning, and delivery.

    PubMed

    Morton, Paula G

    2005-01-01

    Staff development educators can better control their workload and provide a more comprehensive employee education program when the organization adopts a formal five-step process that culminates in the publication of an annual employee education calendar. This article describes the five steps of organization-wide learning needs assessment, resource allocation, priority setting, documentation of the educational plan, and calendar development, including elements and timelines. The annual calendar reflects involvement of staff throughout the facility in the identification, planning, and delivery of education programs. Its publication enhances staff and supervisors' awareness of learning opportunities. Its longer-range perspective assists managers and employees to better plan to meet learning needs and improves participation in staff development activities.

  5. Environmental Hazards Assessment Program annual report, [June 1992--June 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-10-01

    This report, the Environment Hazards Assessment Program (EHAP) Annual Report, is the second of three reports that document activities under the EHAP grant and details progress made during the first year of the grant. The first year was devoted to the development of a working program implementation plan. During the developmental process some key objectives were achieved such as developing a Doctor of Philosophy degree program in Environmental Studies at MUSC (Medical University of South Carolina) and conducting the first Crossroads of Humanity series Round Table Forum. The PIP (Program Implementation Program) details the objectives, management and budgetary basis formore » the overall management and control of the grant over the next four years, the yearly program plans provide the monthly and day-to-day programmatic and budgetary control by which the PIP was developed.« less

  6. Public Law No. 101-167 of 21 November 1989, Foreign Operations, Export Financing, and Related Programs Appropriations Act, 1990.

    PubMed

    1989-01-01

    Among other things, this US Act makes appropriations for foreign operations, export financing, and related programs. With respect to these appropriations, it does the following: 1) prohibits funding for coercive abortion or forced sterilization as part of bilateral development and population planning assistance; 2) prohibits the use of funds appropriated under the Act to lobby for abortion; and 3) prohibits the use of development assistance funds to pay for abortions or involuntary sterilizations as a method of family planning or to motivate or coerce any persons to practice abortions or undergo sterilization, or any biomedical research concerning abortions or involuntary sterilization as a method of family planning. The Act also reaffirms the congressional commitment to population planning, development assistance, and the need for informed voluntary family planning.

  7. Manned space flight nuclear system safety. Volume 6: Space base nuclear system safety plan

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A qualitative identification of the steps required to assure the incorporation of radiological system safety principles and objectives into all phases of a manned space base program are presented. Specific areas of emphasis include: (1) radiological program management, (2) nuclear system safety plan implementation, (3) impact on program, and (4) summary of the key operation and design guidelines and requirements. The plan clearly indicates the necessity of considering and implementing radiological system safety recommendations as early as possible in the development cycle to assure maximum safety and minimize the impact on design and mission plans.

  8. Turnaround Operations Analysis for OTV. Volume 3: Technology Development Plan

    NASA Technical Reports Server (NTRS)

    1988-01-01

    An integrated technology development plan for the technologies required to process both GBOTVs and SBOTVs are described. The plan includes definition of the tests and experiments to be accomplished on the ground, in a Space Shuttle Sortie Mission, on an Expendable Launch Vehicle, or at the Space Station as a Technology Development Mission (TDM). The plan reflects and accommodates current and projected research and technology programs where appropriate.

  9. Santa Fe Community College Staff Development Programs, Policies and Procedures.

    ERIC Educational Resources Information Center

    Santa Fe Community Coll., NM.

    This collection of materials describes various aspects of Santa Fe Community College's (SFCC's) faculty and staff development program. Part 1 explains the philosophy that underpins staff development at SFCC; the planning, programming, information dissemination, and evaluation phases of staff development; and the use of professional development…

  10. Planning, Management and Evaluation: Realizing PIC Potential. Private Industry Council Guide. Working Draft.

    ERIC Educational Resources Information Center

    National Alliance of Business, Inc., Washington, DC.

    This Planning, Management, and Evaluation (PME) guide was developed by the National Alliance of Business as part of its program of management assistance for Private Industry Councils (PICs). The guide is a tool which PICs can use to improve their capability to plan, manage, and evaluate the programs which they administer, and to establish locally…

  11. SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

    2012-11-26

    This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Benioff, R.; Ness, E.; Hirst, J.

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date withmore » the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.« less

  13. A Planning Study for a Cooperative State-Wide Orientation and Mobility Program for the Blind in Oregon. Project Report.

    ERIC Educational Resources Information Center

    Multnomah County Intermediate Education District, Portland, OR.

    An introduction on blindness is followed by a summary of the initial planning grant proposal for cooperative statewide orientation and mobility program for blind children. Background, development, and utilization of mobility-orientation training are discussed in conjunction with educational programs, guide dogs, canes, mobility readiness,…

  14. Regional Interstate Planning Project Program . . . Vol. IX. California Program Evaluation Improvement Project. Seminar Report.

    ERIC Educational Resources Information Center

    Dearmin, Evalyn, Ed.; And Others

    Program evaluation strategies and techniques based on materials developed by the California Evaluation Improvement Project were discussed at this meeting of the Regional Interstate Planning Project (RIPP). RIPP members represent the State Departments of Education of ten western states, and have met periodically over the past nine years to discuss…

  15. Planning for Program Design and Assessment Using Value Creation Frameworks

    ERIC Educational Resources Information Center

    Whisler, Laurel; Anderson, Rachel; Brown, Jenai

    2017-01-01

    This article explains a program design and planning process using the Value Creation Framework (VCF) developed by Wenger, Trayner, and de Laat (2011). The framework involves identifying types of value or benefit for those involved in the program, conditions and activities that support creation of that value, data that measure whether the value was…

  16. An Introduction to Annuity, Charitable Remainder Trust, and Bequest Programs. Second Edition.

    ERIC Educational Resources Information Center

    Dunseth, William B.

    Information on annuity, charitable remainder trust, and bequest programs is presented. Attention is directed to the growth and basic premises of annuity and life income plans and the question of why an institution should include annuities and charitable trusts in a development program. The various types of plans and gifts and the tax advantages of…

  17. Developing Inventory and Monitoring Programs Based on Multiple Objectives

    Treesearch

    Daniel L. Schmoldt; David L. Peterson; David G. Silsbee

    1995-01-01

    Resource inventory and monitoring (I&M) programs in national parks combine multiple objectives in order to create a plan of action over a finite time horizon. Because all program activities are constrained by time and money, it is critical to plan I&M activities that make the best use of available agency resources. However, multiple objectives complicate a...

  18. Serving the Needs of Struggling Developmental Education Students: The Development of a Program Planning Guidebook for Community College Administrators

    ERIC Educational Resources Information Center

    Bohnet, Kimberly Jean

    2016-01-01

    This dissertation describes the process of creating a guidebook that developmental education administrators can use to build their capacity as leaders, learners, and program planners. The guidebook is the product of a qualitative study designed to better understand how community college administrators who have program planning responsibilities for…

  19. An alternate property tax program requiring a forest management plan and scheduled harvesting

    Treesearch

    D.F. Dennis; P.E. Sendak

    1991-01-01

    Vermont's Use Value Appraisal property tax program, designed to address problems such as tax inequity and forced development caused by taxing agricultural and forest land based on speculative values, requires a forest management plan and scheduled harvests. A probit analysis of enrollment provides evidence of the program's success in attracting large parcels...

  20. Toward a space materials systems program

    NASA Technical Reports Server (NTRS)

    Vontiesenhausen, G. F.

    1981-01-01

    A program implementation model is presented which covers the early stages of space material processing and manufacturing. The model includes descriptions of major program elements, development and experiment requirements in space materials processing and manufacturing, and an integration of the model into NASA's long range plans as well as its evolution from present Materials Processing in Space plans.

  1. Planning and Implementation Issues in Bilingual Education Programming. Manual V.

    ERIC Educational Resources Information Center

    Santos-Rivera, Iris; And Others

    Bilingual program development is thoroughly surveyed in this manual. Community involvement in program development is discussed, and suggestions for collecting socio-cultural data appropriate to community role are set forth. Various options for choosing a program at the elementary and secondary levels are presented. Program content is treated in…

  2. Reliability program requirements for aeronautical and space system contractors

    NASA Technical Reports Server (NTRS)

    1987-01-01

    General reliability program requirements for NASA contracts involving the design, development, fabrication, test, and/or use of aeronautical and space systems including critical ground support equipment are prescribed. The reliability program requirements require (1) thorough planning and effective management of the reliability effort; (2) definition of the major reliability tasks and their place as an integral part of the design and development process; (3) planning and evaluating the reliability of the system and its elements (including effects of software interfaces) through a program of analysis, review, and test; and (4) timely status indication by formal documentation and other reporting to facilitate control of the reliability program.

  3. Labor market analysis and development of a prototype program for minority entrepreneurs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-10-01

    The US Congress established the office of Minority Economic Impact (MI), in the Department of Energy, to recommend ways to insure that minorities are afforded an opportunity to participate fully in the energy programs of the Department. One undertaking was the development of a prototype technical assistance program plan tailored to encourage, promote, and assist minority business enterprises in establishing and expanding energy related business opportunities among a specific segment of the population with limited education but with a good business sense and potential for success. The concept of the prototype plan was generated by an unsolicited proposal submitted tomore » the Department of Energy by the Business and Professional Development Institute of the Bronx Community College (City University of New York) to MI, entitled Labor Market Analysis and Development of A Prototype Program for Entrepreneurs.'' Since Bronx Community College is one of the many educational institutions around the country with special programs and resources capable of generating such a plan, the Business and Professional Development seemed to possess the desired qualifications, experience, location and public and private associations necessary to effectively accomplish the study.« less

  4. A neo-strategic planning approach to enhance local tobacco control programs.

    PubMed

    Douglas, Malinda R; Carter, Sara Sally R; Wilson, Andrew P; Chan, Andie

    2015-01-01

    Research in tobacco control demonstrating best practices is widely disseminated; however, application at the local level is often difficult. Translating research into practice requires a concerted effort to develop an understanding of the evidence and how it can be applied within diverse contexts. A strategic planning infrastructure was developed to support the translation of evidence-based interventions into community practice. This paper highlights the strategic process of turning "know-what" into "know-how" to facilitate the strategic planning and implementation of tobacco control best practices at the local level. The purpose, people, process, and product strategies of knowledge management and translation provided a framework for the strategic planning infrastructure. The knowledge translation concepts of audience, motivations, and mechanisms were synergized in the neo-strategic planning component design. The participants were 20 community coalitions funded to implement local tobacco control programs. From 2004 to 2011, the strategic planners facilitated a cyclical process to translate research into practice using a trio of integrated tools, skill-building workshops on strategic planning, and grantee-driven technical assistance and consultation. In the short term, the usefulness of the strategic planning components to the programs was measured. The intermediate outcome was the successful movement of the community programs from the planning stage to the implementation stage. The achievement of community-level changes in planned tobacco control efforts was the overall outcome measure for the success of the local coalitions. Seventeen of 20 communities that began the planning process implemented strategic plans. All 17 of the programs implemented evidence-based practices, resulting in numerous tobacco-free policies, increased cessation, and increased support from the media and community. Bridging the gap between research and practice can enhance the practicality, efficiency, and effectiveness of tobacco control programs at the local level, maximizing the potential positive health impact. Copyright © 2015 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  5. Some Methods for Evaluating Program Implementation.

    ERIC Educational Resources Information Center

    Hardy, Roy A.

    An approach to evaluating program implementation is described. This approach includes the development of a project description which includes a structure matrix, sampling from the structure matrix, and preparing an implementation evaluation plan. The implementation evaluation plan should include: (1) verification of implementation of planned…

  6. Agricultural Occupations Programs Planning Guides

    ERIC Educational Resources Information Center

    Stitt, Thomas R.; And Others

    1977-01-01

    A set of program planning guides that include seven areas (1) Agricultural Production, (2) Agricultural Supplies and Services, (3) Agricultural Mechanics, (4) Agricultural Products, (5) Ornamental Horticulture, (6) Agricultural Resources, and (7) Forestry, were developed and introduced to high school applied biological and agricultural occupations…

  7. 48 CFR 1819.7102 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Rural Area Small Business Plan 1819.7102 General. Pursuant to Public Law 100-590, NASA established a Rural Area Business Enterprise Development Plan, including methods for encouraging prime and subcontractors to use small business concerns located in rural areas as...

  8. 7 CFR 1485.15 - Activity plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Activity plan. 1485.15 Section 1485.15 Agriculture... MARKETS FOR AGRICULTURAL COMMODITIES Market Access Program § 1485.15 Activity plan. (a) General. A participant shall develop a specific activity plan(s) based on its strategic plan and the allocation approval...

  9. Developing Childhood Injury Prevention Programs: An Administrative Guide for State Maternal and Child Health (Title V) Programs.

    ERIC Educational Resources Information Center

    Birch & Davis Associates, Inc., Silver Spring, MD.

    Based primarily on the experience of three childhood injury prevention demonstration projects, this manual provides state Title V program directors with an action guide for developing targeted childhood injury prevention programs. The manual is divided into four sections: background; program planning; program design; and program implementation and…

  10. Integrating student-focused career planning into undergraduate gerontology programs.

    PubMed

    Manoogian, Margaret M; Cannon, Melissa L

    2018-04-02

    As our global older adult populations are increasing, university programs are well-positioned to produce an effective, gerontology-trained workforce (Morgan, 2012; Silverstein & Fitzgerald, 2017). A gerontology curriculum comprehensively can offer students an aligned career development track that encourages them to: (a) learn more about themselves as a foundation for negotiating career paths; (b) develop and refine career skills; (c) participate in experiential learning experiences; and (d) complete competency-focused opportunities. In this article, we discuss a programmatic effort to help undergraduate gerontology students integrate development-based career planning and decision-making into their academic programs and achieve postgraduation goals.

  11. DORCA 2 computer program. Volume 3: Program listing

    NASA Technical Reports Server (NTRS)

    Carey, J. B.

    1972-01-01

    A program listing for the Dynamic Operational Requirements and Cost Analysis Program is presented. Detailed instructions for the computer programming involved in space mission planning and project requirements are developed.

  12. FY 95 engineering work plan for the design reconstitution implementation action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bigbee, J.D.

    Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less

  13. From local development policies to strategic planning-Assessing continuity in institutional coalitions.

    PubMed

    Mazzeo Rinaldi, Francesco

    2016-06-01

    In the last two decades, EU policies have had a fundamental role in orienting regional/local development. The objective of this work is set in this context as it intends to analyze the local development programs activated in Sicily in the last three programming periods. The main aim is to explore whether the EU partnership principle influenced cooperation among local actors, assessing the continuity of local institutional coalition in managing different local development programs within the regional development policy system. We focus, in particular, on Strategic Plans (SP) promoted in Sicily in the transition phase between the 2000-2006 and the 2007-2013 periods. Copyright © 2016 Elsevier Ltd. All rights reserved.

  14. Develop a Professional Learning Plan

    ERIC Educational Resources Information Center

    Journal of Staff Development, 2013

    2013-01-01

    A professional learning plan establishes short-and long-term plans for professional learning and implementation of the learning. Such plans guide individuals, schools, districts, and states in coordinating learning experiences designed to achieve outcomes for educators and students. Professional learning plans focus on the program of educator…

  15. 24 CFR 91.315 - Strategic plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... CONSOLIDATED SUBMISSIONS FOR COMMUNITY PLANNING AND DEVELOPMENT PROGRAMS State Governments; Contents of Consolidated Plan § 91.315 Strategic plan. (a) General. For the categories described in paragraphs (b), (c), (d), (e), and (f) of this section, the consolidated plan must do the following: (1) Indicate the general...

  16. Rural planning organizations--their role in transportation planning and project development in Texas : technical report.

    DOT National Transportation Integrated Search

    2010-10-01

    While a formal planning and programming process is established for urbanized areas through Metropolitan : Planning Organizations, no similar requirement has been established for rural areas. Currently, under the : Safe, Accountable, Flexible, Efficie...

  17. 40 CFR 130.1 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., interstate, areawide and regional and local CWA water quality planning and management activities undertaken... Quality Management (WQM) plans developed under sections 208 and 303 of the Act. (b) Planning and... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING...

  18. California Community College Home Economics Program Plan, 1992. Including: Directory of Professional and Trade Organizations and Directory of Home Economics and Related Program Areas and Instructional Staff.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    Designed to assist local colleges/districts in assessing their existing home economics program, and in developing curricula that respond to the changing needs of students, communities, and the workforce, this plan presents the program guidelines of the California Community Colleges (CCCs). Introductory material describes the history of the program…

  19. A Generalized-Compliant-Motion Primitive

    NASA Technical Reports Server (NTRS)

    Backes, Paul G.

    1993-01-01

    Computer program bridges gap between planning and execution of compliant robotic motions developed and installed in control system of telerobot. Called "generalized-compliant-motion primitive," one of several task-execution-primitive computer programs, which receives commands from higher-level task-planning programs and executes commands by generating required trajectories and applying appropriate control laws. Program comprises four parts corresponding to nominal motion, compliant motion, ending motion, and monitoring. Written in C language.

  20. Phased project planning and development in anticipation of operational programs

    NASA Technical Reports Server (NTRS)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  1. Report of Progress toward Development of the Plan Required in § 23.1-909 for a Cooperative Online Degree Program

    ERIC Educational Resources Information Center

    Trent, Dietra; Blake, Peter

    2016-01-01

    § 23.1-909 requires the Secretary of Education and the Director of the State Council of Higher Education for Virginia (SCHEV) to report, by October 1, 2016, their progress toward development of a plan for a "combined cooperative degree program" whereby any enrolled undergraduate student at any public or private nonprofit institution of…

  2. 7 CFR 1948.57 - Eligible activities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... percent of the total cost of developing growth management and/or housing plans. (2) One hundred percent of the cost of developing aspects of growth management plans and/or housing plans including but not... Program § 1948.57 Eligible activities. Grant Funds may be used for: (a) The preparation of growth...

  3. 36 CFR 906.4 - Formulation of affirmative action plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer, in formulating the Affirmative Action Plan, should consider all phases of... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Formulation of affirmative...

  4. Comparative evaluation of ERTS-A imagery for resource inventory in land-use planning

    NASA Technical Reports Server (NTRS)

    Simonson, G. H. (Principal Investigator)

    1972-01-01

    There are no author-identified significant results in this report. The overall objectives of this program are: (1) use of multidiscipline team approach to determine features that can be successfully monitored by ERTS-1 imagery for resource inventory, planning, land use zoning, and resource development; and (2) using carefully selected sample areas, develop a comprehensive resource inventory mapping system for use in planning, zoning, and resource development. Progress has included compilation and organization of ground truth data and observations in the primary study area of Crook County; resource inventory legend development; assembly and testing of color enhancement equipment; development and adaption of programs for digital data processing; and quick-look evaluations of initial ERTS-1 imagery for Oregon.

  5. Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration

    NASA Technical Reports Server (NTRS)

    Greene, William D.

    2013-01-01

    System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.

  6. Sci-Fri PM: Radiation Therapy, Planning, Imaging, and Special Techniques - 05: A novel respiratory motion simulation program for VMAT treatment plans: a phantom validation study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hubley, Emily; Pierce, Greg; Ploquin, Nicolas

    Purpose: To develop and validate a computational method to simulate craniocaudal respiratory motion in a VMAT treatment plan. Methods: Three 4DCTs of the QUASAR respiratory motion phantom were acquired with a 2cm water-density spherical tumour embedded in cedar to simulate lung. The phantom was oscillating sinusoidally with an amplitude of 2cm and periods of 3, 4, and 5 seconds. An ITV was contoured and 5mm PTV margin was added. High and a low modulation factor VMAT plans were created for each scan. An in-house program was developed to simulate respiratory motion in the treatment plans by shifting the MLC leafmore » positions relative to the phantom. Each plan was delivered to the phantom and the dose was measured using Gafchromic film. The measured and calculated plans were compared using an absolute dose gamma analysis (3%/3mm). Results: The average gamma pass rate for the low modulation plan and high modulation plans were 91.1% and 51.4% respectively. The difference between the high and low modulation plans gamma pass rates is likely related to the different sampling frequency of the respiratory curve and the higher MLC leaf speeds in the high modulation plan. A high modulation plan has a slower gantry speed and therefore samples the breathing cycle at a coarser frequency leading to inaccuracies between the measured and planned doses. Conclusion: A simple program, including a novel method for increasing sampling frequency beyond the control point frequency, has been developed to simulate respiratory motion in VMAT plans by shifting the MLC leaf positions.« less

  7. The clinician's guide to composing effective business plans.

    PubMed

    Ettinger, Alan B; Blondell, Catherine

    2011-01-01

    In today's challenging healthcare environment, clinicians need to understand the fundamentals of financial analysis, which are the underpinnings of their clinical programs, especially when seeking administrative support for new initiatives. The business plan for new clinical program initiatives is composed of diverse elements such as the mission statement, market and competitive analyses, operations plan, and financial analysis. Armed with a basic knowledge of financial analysis of clinical programs, as well as forward-looking analysis of an initiative's added value, the healthcare provider can work much more effectively with administration in developing or creating new healthcare program initiatives.

  8. EIA models and capacity building in Viet Nam: an analysis of development aid programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Doberstein, Brent

    2004-04-01

    There has been a decided lack of empirical research examining development aid agencies as 'agents of change' in environmental impact assessment (EIA) systems in developing countries, particularly research examining the model of environmental planning practice promoted by aid agencies as part of capacity building. This paper briefly traces a conceptual framework of EIA, then introduces the concept of 'EIA capacity building'. Using Viet Nam as a case study, the paper then outlines the empirical results of the research, focusing on the extent to which aid agency capacity-building programs promoted a Technical vs. Planning Model of EIA and on the coherencemore » of capacity-building efforts across all aid programs. A discussion follows, where research results are interpreted within the Vietnamese context, and implications of research results are identified for three main groups of actors. The paper concludes by calling for development aid agencies to reconceptualise EIA capacity building as an opportunity to transform developing countries' development planning processes.« less

  9. Time-based air traffic management using expert systems

    NASA Technical Reports Server (NTRS)

    Tobias, L.; Scoggins, J. L.

    1986-01-01

    A prototype expert system has been developed for the time scheduling of aircraft into the terminal area. The three functions of the air-traffic-control schedule advisor are as follows: (1) for each new arrival, it develops an admisible flight plan for that aircraft; (2) as the aircraft progresses through the terminal area, it monitors deviations from the aircraft's flight plan and provides advisories to return the aircraft to its assigned schedule; and (3) if major disruptions such as missed approaches occur, it develops a revised plan. The advisor is operational on a Symbolics 3600, and is programmed in MRS (a logic programming language), Lisp, and Fortran.

  10. Time-based air traffic management using expert systems

    NASA Technical Reports Server (NTRS)

    Tobias, L.; Scoggins, J. L.

    1986-01-01

    A prototype expert system was developed for the time scheduling of aircraft into the terminal area. The three functions of the air traffic control schedule advisor are as follows: first, for each new arrival, it develops an admissible flight plan for that aircraft. Second, as the aircraft progresses through the terminal area, it monitors deviations from the flight plan and provides advisories to return the aircraft to its assigned schedule. Third, if major disruptions such as missed approaches occur, it develops a revised plan. The advisor is operational on a Symbolics 3600, and is programed in MRS (a logic programming language), Lisp, and FORTRAN.

  11. How to Convince Parents to Stop Spanking Their Children.

    PubMed

    Hudnut-Beumler, Julia; Smith, Ashley; Scholer, Seth J

    2018-02-01

    English- and Spanish-speaking parents of 1- to 5-year-old children were invited to view 5-10 minutes of parent training program, "Play Nicely," as part of the well-child checkup. Key measures were parents' plans to change how they discipline and, if they planned to use less spanking, how the program worked in their situation. Of 197 parents who participated, 128 (65.0%) planned to change how they discipline. Nineteen parents (9.6%) reported that they planned to spank less. The most common reasons for parents to plan to spank less were that the program taught other discipline options (12/19, 63.2%) and that the program taught that spanking was not recommended as a form of discipline (6/19, 31.6%). The majority of parents report that the program works because it offers alternatives to spanking. This study has implications for the development of parent training programs and the primary prevention of child abuse, violence, and other health problems.

  12. The Business Education Curriculum.

    ERIC Educational Resources Information Center

    Selden, William H., Jr.

    The publication is designed to serve as a guide for those responsible for business education in Pennsylvania, emphasizing curriculum planning and the development of course guidelines. Chapter one deals with planning the business education program within the framework of the principles of curriculum construction. Program implementation at the…

  13. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... disbursements of the Board in the administration of this subpart, including the projected costs of Hass avocado..., or on its own initiative develop programs, plans and projects for Hass avocado promotion, industry...

  14. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... disbursements of the Board in the administration of this subpart, including the projected costs of Hass avocado..., or on its own initiative develop programs, plans and projects for Hass avocado promotion, industry...

  15. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... disbursements of the Board in the administration of this subpart, including the projected costs of Hass avocado..., or on its own initiative develop programs, plans and projects for Hass avocado promotion, industry...

  16. A blueprint for community benefit. A CHA-AAHA (Catholic Health Association-American Association of Homes for the Aging) document helps long-term care providers plan for and implement needed services.

    PubMed

    Forschner, B; Trocchio, J

    1993-05-01

    A collaborative effort of the Catholic Health Association (CHA) and the American Association of Homes for the Aging, The Social Accountability Program: Continuing the Community Benefit Tradition of Not-for-Profit Homes and Services for the Aging helps long-term care organizations plan and report community benefit activities. The program takes long-term care providers through five sequential tasks: reaffirming commitment to the elderly and others in the community; developing a community service plan; developing and providing community services; reporting community services; and evaluating the community service role. To help organizations reaffirm commitment, the Social Accountability Program presents a process facilities can use to review their historical roots and purposes and evaluate whether current policies and procedures are consistent with the organizational philosophy. Once this step is completed, providers can develop a community service plan by identifying target populations and the services they need. For facilities developing and implementing such services, the program suggests ways of measuring and monitoring them for budgetary purposes. Once they have implemented services, not-for-profit healthcare organizations must account for their impact on the community. The Social Accountability Program lists elements to be included in community service reports. It also provides guidelines for evaluating these services' effectiveness and the organization's overall community benefit role.

  17. Multicenter Collaborative Quality Assurance Program for the Province of Ontario, Canada: First-Year Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Létourneau, Daniel, E-mail: daniel.letourneau@rmp.uh.on.ca; Department of Radiation Oncology, University of Toronto, Toronto, Ontario; McNiven, Andrea

    2013-05-01

    Purpose: The objective of this work was to develop a collaborative quality assurance (CQA) program to assess the performance of intensity modulated radiation therapy (IMRT) planning and delivery across the province of Ontario, Canada. Methods and Materials: The CQA program was designed to be a comprehensive end-to-end test that can be completed on multiple planning and delivery platforms. The first year of the program included a head-and-neck (H and N) planning exercise and on-site visit to acquire dosimetric measurements to assess planning and delivery performance. A single dosimeter was used at each institution, and the planned to measured dose agreementmore » was evaluated for both the H and N plan and a standard plan (linear-accelerator specific) that was created to enable a direct comparison between centers with similar infrastructure. Results: CQA program feasibility was demonstrated through participation of all 13 radiation therapy centers in the province. Planning and delivery was completed on a variety of infrastructure (treatment planning systems and linear accelerators). The planning exercise was completed using both static gantry and rotational IMRT, and planned-to-delivered dose agreement (pass rates) for 3%/3-mm gamma evaluation were greater than 90% (92.6%-99.6%). Conclusions: All centers had acceptable results, but variation in planned to delivered dose agreement for the same planning and delivery platform was noted. The upper end of the range will provide an achievable target for other centers through continued quality improvement, aided by feedback provided by the program through the use of standard plans and simple test fields.« less

  18. Emergency Planning and Right to Know Programs

    EPA Pesticide Factsheets

    Describes how the Emergency Planning and Community Right-to-Know Act (EPCRA) improves community access to information about chemical hazards and facilitates the development of chemical emergency response plans by tribal governments.

  19. Airport capacity enhancement plan

    DOT National Transportation Integrated Search

    1986-01-01

    The first edition of the Airport Capacity Enhancement Plan has been developed : by the Federal Aviation Administration's newly established Airport Capacity Program : Office (ACPO). The plan is intended to increase the capacity and efficient utiliza :...

  20. Master Plan: The Introduction of Computer Science and Computer Related Instructional Programs, 1982-1985. Office of Instruction Publication Report No. 82-07.

    ERIC Educational Resources Information Center

    Veley, Victor F.; And Others

    This report presents a master plan for the development of computer science and computer-related programs at Los Angeles Trade-Technical College for 1982 through 1985. Introductory material outlines the main elements of the plan: to analyze existing computer courses, to create new courses in Laser Technology, Genetic Engineering, and Robotics; and…

Top