Sample records for program quarterly summary

  1. Hawaiian Volcano Observatory 1960 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  2. Hawaiian Volcano Observatory 1959 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  3. Hawaiian Volcano Observatory 1971 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  4. Hawaiian Volcano Observatory 1961 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  5. Hawaiian Volcano Observatory 1958 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  6. Hawaiian Volcano Observatory 1962 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  7. Hawaiian Volcano Observatory 1970 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  8. Hawaiian Volcano Observatory 1973 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  9. Hawaiian Volcano Observatory 1966 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  10. Hawaiian Volcano Observatory 1965 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  11. Hawaiian Volcano Observatory 1964 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  12. Hawaiian Volcano Observatory 1957 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  13. Hawaiian Volcano Observatory 1972 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  14. Hawaiian Volcano Observatory 1969 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  15. Hawaiian Volcano Observatory 1967 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  16. Hawaiian Volcano Observatory 1968 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  17. Hawaiian Volcano Observatory 1963 Quarterly Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  18. The Amarillo National Resource Center for Plutonium. Quarterly progress detailed report, 1 November 1996--31 January 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Progress for this quarter is given for each of the following Center programs: (1) plutonium information resource; (2) advisory function (DOE and state support); (3) environmental, public health and safety; (3) communication, education, and training; and (4) nuclear and other material studies. Both summaries of the activities and detailed reports are included.

  19. Hawaiian Volcano Observatory 1978 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  20. Hawaiian Volcano Observatory 1974 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  1. Hawaiian Volcano Observatory 1984 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  2. Hawaiian Volcano Observatory 1981 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  3. Hawaiian Volcano Observatory 1980 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  4. Hawaiian Volcano Observatory 1979 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  5. Hawaiian Volcano Observatory 1977 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  6. Hawaiian Volcano Observatory 1983 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  7. Hawaiian Volcano Observatory 1975 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  8. Hawaiian Volcano Observatory 1982 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  9. Hawaiian Volcano Observatory 1976 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  10. Hawaiian Volcano Observatory 1985 Annual Administrative Report

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    INTRODUCTORY NOTE The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. The earthquake summary data are presented as a listing of origin time, depth, magnitude, and other location parameters. Network instrumentation, field station sites, and location algorithms are described. Tilt and other deformation data are included until Summary 77, January to December 1977. From 1978, the seismic and deformation data are published separately, due to differing schedules of data reduction. There are eight quarters - from the fourth quarter of 1959 to the third quarter of 1961 - that were never published. Two of these (4th quarter 1959, 1st quarter 1960) have now been published, using handwritten notes of Jerry Eaton (HVO seismologist at the time) and his colleagues. The seismic records for the remaining six summaries went back to California in 1961 with Jerry Eaton. Other responsibilities intervened, and the seismic summaries were never prepared.

  11. 78 FR 23903 - Proposed Information Collection; Comment Request; Quarterly Summary of State and Local Government...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-23

    ... Quarterly Summary of State and Local Government Tax Revenue, using the F-71 (Quarterly Survey of Property Tax Collections), F-72 (Quarterly Survey of State Tax Collections), and F-73 (Quarterly Survey of Non... data for individual states. The information contained in this survey is the most current information...

  12. Hawaiian Volcano Observatory 1956 Quarterly Administrative Reports

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2007-01-01

    The Hawaiian Volcano Observatory Summaries have been published in the current format since 1956. The Quarterly Summaries (1956 through 1973) and the Annual Summaries (1974 through 1985) were originally published as Administrative Reports. These reports have been compiled and published as U.S. Geological Survey Open-File Reports. The quarterly reports have been combined and published as one annual summary. All the summaries from 1956 to the present are now available as .pdf files at http://www.usgs.gov/pubprod. This report consists of four parts.

  13. Amarillo National Resource Center for Plutonium. Quarterly technical progress report, May 1, 1997--July 31, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Progress summaries are provided from the Amarillo National Center for Plutonium. Programs include the plutonium information resource center, environment, public health, and safety, education and training, nuclear and other material studies.

  14. Educational Technology Program. Quarterly Technical Summary, 1 March - 31 May 1972.

    ERIC Educational Resources Information Center

    Frick, Frederick C.

    The results of the field trials of the Lincoln Training System (LTS-3) program are summarized in this report. The LTS-3 system was designed to teach basic electronics to Air Force personnel at Kessler Air Force Base, Mississippi. The results indicated that the instructional delays due to system failure were minimal, and those failures were…

  15. Lawrence Livermore National Laboratory Safeguards and Security quarterly progress report to the US Department of Energy: Quarter ending December 31, 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, G.; Mansur, D.L.; Ruhter, W.D.

    1994-01-01

    The Lawrence Livermore National Laboratory (LLNL) carries out safeguards and security activities for the Department of Energy (DOE), Office of Safeguards and Security (OSS), as well as other organizations, both within and outside the DOE. This document summarizes the activities conducted for the OSS during the first quarter of fiscal year 1994 (October through December, 1993). The nature and scope of the activities carried out for OSS at LLNL require a broad base of technical expertise. To assure projects are staffed and executed effectively, projects are conducted by the organization at LLNL best able to supply the needed technical expertise.more » These projects are developed and managed by senior program managers. Institutional oversight and coordination is provided through the LLNL Deputy Director`s office. At present, the Laboratory is supporting OSS in five areas: (1) Safeguards Technology, (2) Safeguards and Decision Support, (3) Computer Security, (4) DOE Automated Physical Security, and (5) DOE Automated Visitor Access Control System. This report describes the activities in each of these five areas. The information provided includes an introduction which briefly describes the activity, summary of major accomplishments, task descriptions with quarterly progress, summaries of milestones and deliverables and publications published this quarter.« less

  16. Lawrence Livermore National Laboratory safeguards and security quarterly progress report to the U.S. Department of Energy. Quarter ending December 31, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, G.; Mansur, D.L.; Ruhter, W.D.

    The Lawrence Livermore National Laboratory (LLNL) carries out safeguards and security activities for the Department of Energy (DOE), Office of Safeguards and Security (OSS), as well as other organizations, both within and outside the DOE. This document summarizes the activities conducted for the OSS during the First Quarter of Fiscal Year 1997 (October through December, 1996). The nature and scope of the activities carried out for OSS at LLNL require a broad base of technical expertise. To assure projects are staffed and executed effectively, projects are conducted by the organization at LLNL best able to supply the needed technical expertise.more » These projects are developed and managed by senior program managers. Institutional oversight and coordination is provided through the LLNL Deputy Director`s office. At present, the Laboratory is supporting OSS in four areas: (1) safeguards technology; (2) safeguards and material accountability; (3) computer security--distributed systems; and (4) physical and personnel security support. The remainder of this report describes the activities in each of these four areas. The information provided includes an introduction which briefly describes the activity, summary of major accomplishments, task descriptions with quarterly progress, summaries of milestones and deliverables and publications published this quarter.« less

  17. United States Air Force Statistical Digest, Fiscal Year 1960. Fifteenth Edition

    DTIC Science & Technology

    1960-09-30

    USAF CIVILIAN EMPLOYEES IN SALARIED AND WAGE BOARD GROUPS EMPLOYED UNDER MILITARY , ASSISTANCE PROGRAM (MAP), AT END OF QUARTER - FY � (Previous year...provide summary data on all aspects of the Mlli_ 165 tary Assistance program administered by the Air Force. The data were compiled from progress reports...Military Assistance . MAP AIRCRAFT - Aircraft in foreign countries provided by the USAF under Military Assistance Program . AIRCRAFT ATTRITION - Aircraft

  18. Educational Technology Program. Quarterly Technical Summary, Period Ending 31 May 1970.

    ERIC Educational Resources Information Center

    Frick, Frederick C.

    An overview of the Lincoln Training System (LTS) and descriptions of the hardward and software of the LTS-1 and LTS-2 systems are provided. The overall program seeks to develop, test, and evaluate technical aids to vocational training systems. These are appropriate to this field because the high costs need to be reduced and because there are clear…

  19. Quarterly environmental data summary for first quarter 1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the first quarter of 1999 is enclosed. The data presented in this constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group and merged into the database during the first quarter of 1999. KPA results for on-site total uranium analyses performed during first quarter 1999 are included. Air monitoring data presented are the most recent completemore » sets of quarterly data.« less

  20. About Women on Campus, 1996.

    ERIC Educational Resources Information Center

    Sandler, Bernice Resnick, Ed.

    1996-01-01

    This quarterly newsletter provides information about the programs, issues, and concerns of women students, faculty, and administrators in higher education. Each of these four issues (comprising 1 year's worth) presents brief summaries of news items or reports in regularly appearing sections covering campus news, the workplace, sexual harassment,…

  1. About Women on Campus, 1998.

    ERIC Educational Resources Information Center

    Sandler, Bernice Resnick, Ed.

    1998-01-01

    This quarterly newsletter provides information about the programs, issues, and concerns of women students, faculty, and administrators in higher education. Each of these four issues (comprising a single year) presents brief summaries of new items or reports in regularly appearing sections covering campus news, the workplace, sexual harassment,…

  2. Inertial Confinement Fusion Annual Report 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Correll, D

    The ICF Annual Report provides documentation of the achievements of the LLNL ICF Program during the fiscal year by the use of two formats: (1) an Overview that is a narrative summary of important results for the fiscal year and (2) a compilation of the articles that previously appeared in the ICF Quarterly Report that year. Both the Overview and Quarterly Report are also on the Web at http://lasers.llnl.gov/lasers/pubs/icfq.html. Beginning in Fiscal Year 1997, the fourth quarter issue of the ICF Quarterly was no longer printed as a separate document but rather included in the ICF Annual. This change providedmore » a more efficient process of documenting our accomplishments with-out unnecessary duplication of printing. In addition we introduced a new document, the ICF Program Monthly Highlights. Starting with the September 1997 issue and each month following, the Monthly Highlights will provide a brief description of noteworthy activities of interest to our DOE sponsors and our stakeholders. The underlying theme for LLNL's ICF Program research continues to be defined within DOE's Defense Programs missions and goals. In support of these missions and goals, the ICF Program advances research and technology development in major interrelated areas that include fusion target theory and design, target fabrication, target experiments, and laser and optical science and technology. While in pursuit of its goal of demonstrating thermonuclear fusion ignition and energy gain in the laboratory, the ICF Program provides research and development opportunities in fundamental high-energy-density physics and supports the necessary research base for the possible long-term application of inertial fusion energy for civilian power production. ICF technologies continue to have spin-off applications for additional government and industrial use. In addition to these topics, the ICF Annual Report covers non-ICF funded, but related, laser research and development and associated applications. We also provide a short summary of the quarterly activities within Nova laser operations, Beamlet laser operations, and National Ignition Facility laser design. LLNL's ICF Program falls within DOE's national ICF program, which includes the Nova and Beamlet (LLNL), OMEGA (University of Rochester Laboratory for Laser Energetics), Nike (Naval Research Laboratory), and Trident (Los Alamos National Laboratory) laser facilities. The Particle Beam Fusion Accelerator (Z) and Saturn pulsed-power facilities are at Sandia National Laboratories. General Atomics, Inc., develops and provides many of the targets for the above experimental facilities. Many of the ICF Annual Report articles are co-authored with our colleagues from these other ICF institutions.« less

  3. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

  4. Educational Technology Program. Quarterly Technical Summary, 1 December 1970 through 28 February 1971.

    ERIC Educational Resources Information Center

    Frick, Frederick C.

    The decision to employ direct rather than diffraction recording in the Lincoln Training System (LTS) is reported. This resulted from the findings that direct recording was practical at higher densities than previously thought possible and that rapid access to a number of fiche would compensate for the limited number of frames per fiche realized…

  5. Government-Funded Students and Courses--January to March 2016. Australian Vocational Education and Training Statistics

    ERIC Educational Resources Information Center

    National Centre for Vocational Education Research (NCVER), 2016

    2016-01-01

    This publication provides a summary of data relating to students, programs, subjects, and training providers in Australia's government-funded vocational education and training (VET) system (defined as Commonwealth and state/territory government funded training). This is the first time that government-funded data from one quarter is compared with…

  6. Educational Technology Program. Quarterly Technical Summary Report, 1 December 1971-29 February 1972.

    ERIC Educational Resources Information Center

    Frick, Frederick C.

    The Lincoln Training System (LTS-3) is a computer-assisted instructional system for training Air Traffic Controllers and Basic Electronic students in the United States Air Force. This document describes the components of the system prior to its initial field trial in mid-April 1972 at Kessler Air Force Base. The system is made up of 14 Basic…

  7. 78 FR 59093 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-25

    ...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the fourth quarter 2013 rail cost adjustment factor (RCAF) and cost index filed by the Association of American Railroads. The fourth quarter 2013 RCAF...

  8. 78 FR 31475 - Rescission of Quarterly Financial Reporting Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-24

    ... No. FMCSA-2012-0020] RIN-2126-AB48 Rescission of Quarterly Financial Reporting Requirements AGENCY...); request for comments. SUMMARY: FMCSA proposes to eliminate the quarterly financial reporting requirements... person argued that the financial reporting requirements transferred from the Interstate Commerce...

  9. The selective treatment of clinical mastitis based on on-farm culture results: II. Effects on lactation performance, including clinical mastitis recurrence, somatic cell count, milk production, and cow survival.

    PubMed

    Lago, A; Godden, S M; Bey, R; Ruegg, P L; Leslie, K

    2011-09-01

    The objective of this multi-state, multi-herd clinical trial was to report on the efficacy of using an on-farm culture system to guide strategic treatment decisions in cows with clinical mastitis. The study was conducted in 8 commercial dairy farms ranging in size from 144 to 1,795 cows from Minnesota, Wisconsin, and Ontario, Canada. A total of 422 cows affected with mild or moderate clinical mastitis in 449 quarters were randomly assigned to either (1) a positive-control treatment program or (2) an on-farm culture-based treatment program. Quarter cases assigned to the positive-control group received immediate on-label intramammary treatment with cephapirin sodium. Quarters assigned to the culture-based treatment program were not treated until the results of on-farm culture were determined after 18 to 24h of incubation. Quarters in the culture-based treatment program that had gram-positive growth or a mixed infection were treated according to label instruction using intramammary cephapirin sodium. Quarters assigned to the culture-based treatment program that had gram-negative or no-growth did not receive intramammary therapy. It was already reported in a companion paper that the selective treatment of clinical mastitis based on on-farm culture results decreases antibiotic use by half and tends to decrease milk withholding time without affecting short-term clinical and bacteriological outcomes. The present article reports on long-term outcomes of the aforementioned study. No statistically significant differences existed between cases assigned to the positive-control program and cases assigned to the culture-based treatment program in risk and days for recurrence of clinical mastitis in the same quarter (35% and 78 d vs. 43% and 82 d), linear somatic cell count (4.2 vs. 4.4), daily milk production (30.0 vs. 30.7 kg), and risk and days for culling or death events (28% and 160 d vs. 32% and 137 d) for the rest of the lactation after enrollment of the clinical mastitis case. In summary, the selective treatment of clinical mastitis based on on-farm culture resulted in no differences in long-term outcomes, such as recurrence of clinical mastitis in the same quarter, somatic cell count, milk production, and cow survival for the rest of the lactation after clinical mastitis. Copyright © 2011 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.

  10. 75 FR 17462 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-06

    ... decision may be purchased by contacting the office of Public Assistance, Governmental Affairs, and...-2)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the second quarter 2010 Rail Cost...

  11. 4th Quarter Transportation Report FY 2014: Radioactive Waste Shipments to and from the Nevada National Security Site (NNSS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gregory, Louis

    2014-12-02

    This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to and from the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. There was one shipment of two drums sent for offsite treatment and disposal. This report summarizes the 4th quarter of Fiscal Year (FY) 2014 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments. This report also includes annualmore » summaries for FY 2014.« less

  12. 76 FR 59483 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-26

    ... the decision may be purchased by contacting the Office of Public Assistance, Governmental Affairs, and...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the fourth quarter 2011 Rail Cost Adjustment...

  13. Final Project Report, DynAX Innovations in Programming Models, Compilers and Runtime Systems for Dynamic Adaptive Event Driven Execution Models

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gao, Guang; Meister, Benoit; Padua, David

    2015-12-31

    This report contains a summary of the work done for the Dynax Project from 9/1/2012 to 8/31/2015. Much of the information presented is discussed in further detail in other STI annual and quarterly reports. Additionally, a NCE report was submitted covering work done from the period of 9/1/2015 to 12/31/2015.

  14. Development of a Diabetes Education Program for Youth With Type 2 Diabetes

    PubMed Central

    Grey, Margaret; Schreiner, Barbara; Pyle, Laura

    2009-01-01

    Purpose The purpose of this article is to present the Treatment Options for Type 2 Diabetes in Adolescents and Youth (TOD2AY) study and a description of the implementation of the standard diabetes education (SDE) program. Methods A total of 218 participants (one third of the eventual sample of 750) were initially enrolled in the study. To date, the mean age of participants was 14.3 + 2.1 years, with 63% being female. Families of study participants were largely low or middle income (more than half report family income <$35 000) and about three-quarters were minority. Results More than three-quarters (79%) of families achieved full mastery of the entire SDE program. Mastery required on average 5.5 + 1.3 sessions. In addition, 62% of the families were able to achieve mastery of the session topic in a single visit. Conclusions In summary, the TOD2AY study SDE program fills the need for effective, engaging materials for youth and their families to use in mastering essential type 2 diabetes skills and knowledge. PMID:19244566

  15. 77 FR 37958 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-25

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the third quarter 2012 rail cost adjustment...

  16. 75 FR 35877 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-23

    ... available on our Web site, http://www.stb.dot.gov . Copies of the decision may be purchased by contacting...-3)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the third quarter 2010 rail cost...

  17. 75 FR 58019 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the fourth quarter 2010 Rail Cost Adjustment...

  18. 75 FR 80895 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-23

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the first quarter 2011 Rail Cost Adjustment...

  19. 76 FR 16037 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the second quarter 2011 Rail Cost Adjustment...

  20. 78 FR 37660 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board approves the third quarter 2013 Rail Cost Adjustment Factor...

  1. 76 FR 37191 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... our Web site, http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the third quarter 2011 Rail Cost Adjustment...

  2. 78 FR 17764 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the second quarter 2013 Rail Cost Adjustment...

  3. Washington Community Colleges Fall Quarter Report, 1980.

    ERIC Educational Resources Information Center

    Story, Sherie; And Others

    This three-part report presents a series of 46 tables providing data about enrollments, student characteristics, and personnel in the Washington community college system for Fall Quarter 1980. After a summary of the statistical highlights of the study, Chapter I offers historical data on Fall Quarter, full-time equivalent (FTE) and student…

  4. 76 FR 80448 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the first quarter 2012 rail cost adjustment factor (RCAF... decision, which is available on our Web site, http://www.stb.dot.gov . Copies of the decision may be...

  5. 77 FR 58910 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-24

    ..., http://www.stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the fourth quarter 2012 rail cost adjustment factor (RCAF...

  6. Peacekeeper Monitoring Program: 1986 Annual Report with Fourth Quarter Summary

    DTIC Science & Technology

    1987-05-01

    WY Cheyenne, WY Boeing Aerospace Co. Owl Constructors Arcadia, CA Westinghouse Elec. Co. Sunnyvale, CA I Consolidated Amtec Aurora, CO Construction...Chalk Buttes Landscpg Douglas, WY I Cook-McCann Concrete Cheyenne, WY Colorado Concrt Sawng Ft Collins, CO Cova And Associates Douglas, WY ICG Electric ... Electrical Willmar, MN Co’rtez Honeywell Minneapolis, MN Const Co. L&L Insulation Rapid City, SD a Mechanical Systems Cheyenne, WY Simpson Electric

  7. Education Statistics Quarterly. Volume 5, Issue 4, 2004. NCES 2005-610

    ERIC Educational Resources Information Center

    National Center for Education Statistics, 2004

    2004-01-01

    The "Quarterly" offers an accessible, convenient overview of all NCES products released in a given quarter. Each issue includes: short publications (those less than 15 pages in length) in their entirety, executive summaries of longer publications, descriptive paragraphs of other NCES products, as well as notices about training and funding…

  8. 75 FR 10561 - Pricing for 2010 United States Mint America the Beautiful QuartersTM

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-08

    ... DEPARTMENT OF THE TREASURY United States Mint Pricing for 2010 United States Mint America the...: Notice. SUMMARY: The United States Mint is announcing the price of the 2010 United States Mint America the Beautiful Quarters Two-Roll Set and the 2010 United States Mint America the Beautiful Quarters 100...

  9. GPHS RTGs in Support of the Cassini RTG Program. Final Technical Report, January 11, 1991 - April 30, 1998

    DOE R&D Accomplishments Database

    1998-08-01

    As noted in the historical summary, this program encountered a number of changes in direction, schedule, and scope over the period 11 January 1991 to 31 December 1998. The report provides a comprehensive summary of all the varied aspects of the program over its seven and a quarter years, and highlights those aspects that provide information beneficial to future radioisotope programs. In addition to summarizing the scope of the Cassini GPHS RTG Program provided as background, the introduction includes a discussion of the scope of the final report and offers reference sources for information on those topics not covered. Much of the design heritage of the GPHS RTG comes from the Multi Hundred Watt (MHW) RTGs used on the Lincoln Experimental Satellites (LES) 8/9 and Voyager spacecraft. The design utilized for the Cassini program was developed, in large part, under the GPHS RTG program which produced the Galileo and Ulysses RTGs. Reports from those programs included detailed documentation of the design, development, and testing of converter components and full converters that were identical to, or similar to, components used in the Cassini program.

  10. Weldon Spring Site Remedial Action Project Federal Facilities Agreement: Quarterly environmental data summary for third quarter 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-11-06

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the third quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the third quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Significant data, defined as data values thatmore » have exceeded defined above normal Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits, and other guidelines. The procedures also establish actions to be taken in the event that above normal data occur.« less

  11. EPA Recovery Mapper

    EPA Pesticide Factsheets

    The EPA Recovery Mapper is an Internet interactive mapping application that allows users to discover information about every American Recovery and Reinvestment Act (ARRA) award that EPA has funded for six programs. By integrating data reported by the recipients of Recovery Act funding and data created by EPA, this application delivers a level of transparency and public accessibility to users interested in EPA's use of Recovery Act monies. The application is relatively easy to use and builds on the same mapping model as Google, Bing, MapQuest and other commonly used mapping interfaces. EPA Recovery Mapper tracks each award made by each program and gives basic Quick Facts information for each award including award name, location, award date, dollar amounts and more. Data Summaries for each EPA program or for each state are provided displaying dollars for Total Awarded, Total Received (Paid), and Total Jobs This Quarter by Recovery for the latest quarter of data released by Recovery.gov. The data are reported to the government and EPA four times a year by the award recipients. The latest quarterly report will always be displayed in the EPA Recovery Mapper. In addition, the application provides many details about each award. Users will learn more about how to access and interpret these data later in this document. Data shown in the EPA Recovery Mapper are derived from information reported back to FederalReporting.gov from the recipients of Recovery Act funding. EPA

  12. Quarterly environmental data summary for first quarter 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-05-01

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the first quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data were received from the contract laboratories, verified by the Weldon Spring Site verification group and, except for air monitoring data and site KPA generated data (uranium analyses), merged into the data base during the first quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Air data are not stored inmore » the data base, and KPA data are not merged into the regular data base. Significant data, defined as data values that have exceeded defined {open_quotes}above normal{close_quotes} Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES&H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits and other guidelines. The procedures also establish actions to be taken in the event that {open_quotes}above normal{close_quotes} data occur. All data received and verified during the first quarter were within a permissible range of variability except for those detailed below. Above normal occurrences are cited for groundwater, air, and NPDES data. There were none for springs or surface water. The following discussion offers a brief summary of the data merged during the first quarter that exceeded the above normal criteria and updates on past reported above normal data. The attached tables present the most recent data for air and the data merged into the data base during the first quarter 1998 for groundwater, NPDES, surface water, and springs. Graphs showing concentrations of selected contaminants of concern at some of the critical locations have also been included in this QEDS. The graphs are discussed in the separate sections.« less

  13. PM-1 NUCLEAR POWER PLANT PROGRAM. Quarterly Progress Report No. 2 for June 1 to August 31, 1959

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sieg, J.S.; Smith, E.H.

    1959-10-01

    The objective of the contract is the design, development, fabrication, installation, and initial testing and operation of a prepackaged air- transportable pressurized water reactor nuclear power plant, the PM-1. The specified output is 1 Mwe and 7 million Btu/hr of heat. The plant is to be operational by March 1962. The principal efforts were completion of the plant parametric study and preparation of the preliminary design. A summary of design parameters is given. Systems development work included study and selection of packages for full-scale testing, a survey of in-core instrumentation techniques, control and instrumentation development, and development of components formore » the steam generator, condenser, and turbine generator, which are not commercially available. Reactor development work included completion of the parametric zeropower experiments and preparrtions for a flexible zeropower test program, a revision of plans for irradiation testing PM-1 fuel elements, initiation of a reactor flow test program, outliring of a heat tnansfer test program, completion of the seven-tube test section (SETCH-1) tests, and evaluation of control rod actuators leading to specification of a magnetic jack-type control rod drive similar to that reported in ANL-5768. Completion of the prelimirary design led to initiation of the final design effort, which will be the principal activity during the next two project quarters. Preparations for core fabrication included procurement of core cladding material for the zero-power teat core, arrangement with a subcontractor to convent UF/sub 6/ to UO/sub 2/ and to commence delivery of the oxide during the next quarter, development of fuel element fabrication and ultrasonic testing techniques, study of control rod materials, UO/sub 2/ recovery techniques, and boron analysis methods. Preliminary work on site preparation was pursued with receipt of USAEC approval for a location on the eastern slope of Warren Peak at Sundance, Wyoming. A survey of this site is underway. A preliminary Hazards Summary Report is in preparation. (For preceding period see MND-M-1812.) (auth)« less

  14. 78 FR 26116 - Pricing for the 2013 America the Beautiful Quarter Five Ounce Silver Uncirculated CoinsTM

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... DEPARTMENT OF THE TREASURY United States Mint Pricing for the 2013 America the Beautiful Quarter Five Ounce Silver Uncirculated Coins TM AGENCY: United States Mint, Department of the Treasury. ACTION: Notice. SUMMARY: The United States Mint is announcing the price of the 2013 America the Beautiful Quarter...

  15. 78 FR 24185 - Board of Regents of the Uniformed Services University of the Health Sciences; Notice of Quarterly...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... University and 5 U.S.C. 552b(c)(6) as the subject matter involves personal and private observations. Written... University of the Health Sciences; Notice of Quarterly Meeting AGENCY: Department of Defense, Uniformed Services University of the Health Sciences (USU). ACTION: Quarterly meeting notice. SUMMARY: Under the...

  16. 75 FR 10345 - Pricing for 2010 United States Mint America the Beautiful Quarters Proof Set, etc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... DEPARTMENT OF THE TREASURY United States Mint Pricing for 2010 United States Mint America the.... SUMMARY: The United States Mint is announcing the prices of the 2010 United States Mint America the Beautiful Quarters Proof Set; 2010 United States Mint America the Beautiful Quarters Silver Proof Set; 2010...

  17. Automotive Stirling Engine Development Program

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The third quarter (April-June, 1978) effort of the Ford/DOE Automotive Stirling Engine Development Program is reported, specifically Task 1 of that effort, which is Fuel Economy Assessment. At the end of this quarter the total fourth generation fuel economy projection was 26.12 MPG (gasoline) with a confidence level of 44%. This represents an improvement of 66.4% over the baseline M-H fuel economy of 15.7 MPG. The confidence level for the original 20.6 MPG goal has been increased from 53% to 57%. Engine 3X17 has accumulated a total of 213 hours of variable speed running. A summary of the individual sub-tasks of Task 1 are given. The sub-tasks are grouped into two categories: Category 1 consists of those sub-tasks which are directly related to fuel economy and Category 2 consists of those sub-tasks which are not directly related to fuel economy but are an integral part of the Task 1 effort.

  18. Electric power quarterly, April-June 1987

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1987-10-13

    The EPQ presents monthly summaries of electric utility statistics at the national, divisional, state, company, and plant levels on the following subjects: quantity of fuel, cost of fuel, quality of fuel, net generation, fuel consumption, fuel stocks. In addition, the EPQ presents a quarterly summary of reported major disturbances and unusual occurrences. These data are collected on the Form IE-417R. Every electric utility engaged in the generation, transmission, or distribution of electric energy must file a report with DOE if it experiences a major power system emergency.

  19. Electric power quarterly, July-September 1987

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-01-22

    The EPQ presents monthly summaries of electric utility statistics at the national, divisional, state, company, and plant levels on the following subjects: quantity of fuel, cost of fuel, quality of fuel, net generation, fuel consumption, fuel stocks. In addition, the EPQ presents a quarterly summary of reported major disturbances and unusual occurrences. These data are collected on the Form IE-417R. Every electric utility engaged in the generation, transmission, or distribution of electric energy must file a report with DOE if it experiences a major power system emergency.

  20. 76 FR 22910 - ACHP Quarterly Business Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... ADVISORY COUNCIL ON HISTORIC PRESERVATION ACHP Quarterly Business Meeting AGENCY: Advisory Council on Historic Preservation. ACTION: Notice. SUMMARY: Notice is hereby given that the Advisory Council... Historic Preservation Working Group IX. New Business X. Adjourn Note: The meetings of the ACHP are open to...

  1. 2nd Quarter Transportation Report FY 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gregory, L.

    2014-07-01

    This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. This report summarizes the second quarter of fiscal year (FY) 2014 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments. This report also includes annual summaries for FY 2014 in Tables 4 and 5. Tabular summaries are provided which includemore » the following: Sources of and carriers for LLW and MLLW shipments to and from the NNSS; Number and external volume of LLW and MLLW shipments; Highway routes used by carriers; and Incident/accident data applicable to LLW and MLLW shipments. In this report shipments are accounted for upon arrival at the NNSS, while disposal volumes are accounted for upon waste burial. The disposal volumes presented in this report do not include minor volumes of non-radioactive materials that were approved for disposal. Volume reports showing cubic feet (ft3) generated using the Low-Level Waste Information System may vary slightly due to differing rounding conventions.« less

  2. Electric power quarterly, October-December 1987

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-04-19

    The EPQ presents monthly summaries of electric utility statistics at the national, divisional, state, company, and plant levels on the following subjects: quantity of fuel, cost of fuel, quality of fuel, net generation, fuel consumption, and fuel stocks. In addition, the EPQ presents a quarterly summary of reported major disturbances and unusual occurrences. These data are collected on the Form IE-417R. Every electric utility engaged in the generation, transmission, or distribution of electric energy must file a report with DOE if it experiences a major power system emergency.

  3. Electric power quarterly, July--September 1988

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-01-19

    The Electric Power Quarterly (EPQ) is prepared by the Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA). The EPQ is designed to provide energy decisionmakers with accurate and timely generation and fuel cost and quality information on a plant-by-plant basis. This publication is designed for applications by electric utilities, fuel suppliers, consumers, educational institutions, and government in recognition of the importance of energy planning. The EPQ presents monthly summaries of electric utility statistics at the national, Census division, state, company, and plant levels on the following subjects: quantity of fuel; cost of fuel;more » quality of fuel; net generation; fuel consumption, and fuel stocks. In addition, the EPQ presents a quarterly summary of reported major disturbances and unusual occurrences. 1 fig., 15 tabs.« less

  4. 77 FR 76169 - Quarterly Rail Cost Adjustment Factor

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ....stb.dot.gov . Copies of the decision may be purchased by contacting the Office of Public Assistance...)] Quarterly Rail Cost Adjustment Factor AGENCY: Surface Transportation Board, DOT. ACTION: Approval of rail cost adjustment factor. SUMMARY: The Board has approved the AAR's proposed rebasing calculations and...

  5. 75 FR 70951 - Notice, Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-19

    ... NATIONAL COUNCIL ON DISABILITY (NCD) Sunshine Act Meetings Notice, Correction Type: Quarterly Meeting. Summary: NCD published a Sunshine Act Meeting Notice in the Federal Register on November 12, 2010, notifying the public of a quarterly meeting in Washington, DC. The times have been changed for a portion of...

  6. Education Statistics Quarterly, Spring 2001.

    ERIC Educational Resources Information Center

    Education Statistics Quarterly, 2001

    2001-01-01

    The "Education Statistics Quarterly" gives a comprehensive overview of work done across all parts of the National Center for Education Statistics (NCES). Each issue contains short publications, summaries, and descriptions that cover all NCES publications, data products and funding opportunities developed over a 3-month period. Each issue…

  7. Semi-annual report of the Department of Energy, Office of Environmental Management, Quality Assessment Program. QAP 49 summary of evaluations of 3217 reported analyses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Greenlaw, P.D.

    1998-12-01

    This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s results and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 4 days after the reporting deadlinemore » via the Internet at www.eml.doe.gov. This report presents the results from the analysis of the 49th set of environmental quality assessment samples (QAP XLIX) that were received on or before December 1, 1998.« less

  8. NASA aviation safety reporting system

    NASA Technical Reports Server (NTRS)

    1977-01-01

    During the third quarter of operation of the Aviation Safety Reporting System (ASRS), 1429 reports concerning aviation safety were received from pilots, air traffic controllers, and others in the national aviation system. Details of the administration and results of the program are discussed. The design and construction of the ASRS data base are briefly presented. Altitude deviations and potential aircraft conflicts associated with misunderstood clearances were studied and the results are discussed. Summary data regarding alert bulletins, examples of alert bulletins and responses to them, and a sample of deidentified ASRS reports are provided.

  9. 3rd Quarter Transportation Report FY 2014: Radioactive Waste Shipments to and from the Nevada National Security Site (NNSS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gregory, Louis

    2014-09-20

    This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. This report summarizes the 3rd quarter of Fiscal Year (FY) 2014 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments. This report also includes annual summaries for FY 2014 in Tables 4 and 5. Tabular summaries are provided which includemore » the following: Sources of and carriers for LLW and MLLW shipments to and from the NNSS; Number and external volume of LLW and MLLW shipments; Highway routes used by carriers; and Incident/accident data applicable to LLW and MLLW shipments. In this report shipments are accounted for upon arrival at the NNSS, while disposal volumes are accounted for upon waste burial. The disposal volumes presented in this report do not include minor volumes of non-radioactive materials that were approved for disposal. Volume reports showing cubic feet generated using the Low-Level Waste Information System may vary slightly due to differing rounding conventions.« less

  10. Semi-annual report of the Department of Energy, Office of Environmental Restoration and Waste Management, Quality Assessment Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sanderson, C.G.; Klusek, C.S.

    1993-01-04

    This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976. real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s results and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 3 days after the reporting deadlinemore » via a modem-telephone connection to the EML computer. This is the 42nd report of this program.« less

  11. Early estimate of motor vehicle traffic fatalities for the first quarter (January-March) of 2009 : a brief statistical summary

    DOT National Transportation Integrated Search

    2009-06-01

    A statistical projection of traffic fatalities for the first quarter of 2009 shows that an estimated 7,689 people died in motor vehicle traffic crashes. This represents a decline of about 9 percent as compared to the 8,451 fatalities that occurred in...

  12. Education Statistics Quarterly. Volume 6, Issue 4, 2004. NCES 2006-613

    ERIC Educational Resources Information Center

    National Center for Education Statistics, 2006

    2006-01-01

    The "Quarterly" offers a comprehensive overview of work done across all of the National Center for Education Statistics (NCES). Each issue includes short publications and summaries covering all NCES publications and data products released in a given time period as well as notices about training and funding opportunities. In addition,…

  13. 78 FR 5245 - Pricing for New Product-America the Beautiful Quarters® Three-Roll Set

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-24

    ... DEPARTMENT OF THE TREASURY United States Mint Pricing for New Product--America the Beautiful Quarters[supreg] Three-Roll Set AGENCY: United States Mint, Department of the Treasury. ACTION: Notice. SUMMARY: The United States Mint is announcing pricing for a new product, the America the Beautiful...

  14. 77 FR 31069 - Pricing for the 2012 America the Beautiful Quarters Five Ounce Silver Uncirculated CoinsTM

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... DEPARTMENT OF THE TREASURY United States Mint Pricing for the 2012 America the Beautiful Quarters Five Ounce Silver Uncirculated Coins TM AGENCY: United States Mint, Department of the Treasury. ACTION: Notice. SUMMARY: The United States Mint is announcing the price of the 2012 America the Beautiful...

  15. Hawaiian volcano observatory summary 103; Part I, seismic data, January to December 2003

    USGS Publications Warehouse

    Nakata, Jennifer S.; Heliker, C.; Orr, T.; Hoblitt, R.

    2004-01-01

    The Hawaiian Volcano Observatory (HVO) summary presents seismic data gathered during the year and a chronological narrative describing the volcanic events. The seismic summary is offered without interpretation as a source of preliminary data. It is complete in the sense that most data for events of M= 1.5 routinely gathered by the Observatory are included. The emphasis in collection of tilt and deformation data has shifted from quarterly measurements at a few water-tube tilt stations ('wet' tilt) to a larger number of continuously recording borehole tiltmeters, repeated measurements at numerous spirit-level tilt stations ('dry' tilt), and surveying of level and trilateration networks. Because of the large quantity of deformation data now gathered and differing schedules of data reduction, the seismic and deformation summaries are published separately. The HVO summaries have been published in various forms since 1956. Summaries prior to 1974 were issued quarterly, but cost, convenience of preparation and distribution, and the large quantities of data dictated an annual publication beginning with Summary 74 for the year 1974. Summary 86 (the introduction of CUSP at HVO) includes a description of the seismic instrumentation, calibration, and processing used in recent years. The present summary includes background information on the seismic network and processing to allow use of the data and to provide an understanding of how they were gathered.

  16. Hawaiian Volcano Observatory summary 100; Part 1, seismic data, January to December 2000

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2001-01-01

    The Hawaiian Volcano Observatory (HVO) summary presents seismic data gathered during the year and a chronological narrative describing the volcanic events. The seismic summary is offered without interpretation as a source of preliminary data. It is complete in the sense that all data for events of M≥1.5 routinely gathered by the Observatory are included. The emphasis in collection of tilt and deformation data has shifted from quarterly measurements at a few water-tube tilt stations (“wet” tilt) to a larger number of continuously recording borehole tiltmeters, repeated measurements at numerous spirit-level tilt stations (“dry” tilt), and surveying of level and trilateration networks. Because of the large quantity of deformation data now gathered and differing schedules of data reduction, the seismic and deformation summaries are published separately. The HVO summaries have been published in various forms since 1956. Summaries prior to 1974 were issued quarterly, but cost, convenience of preparation and distribution, and the large quantities of data dictated an annual publication beginning with Summary 74 for the year 1974. Summary 86 (the introduction of CUSP at HVO) includes a description of the seismic instrumentation, calibration, and processing used in recent years. The present summary includes enough background information on the seismic network and processing to allow use of the data and to provide an understanding of how they were gathered.

  17. Hawaiian Volcano Observatory summary 101: Part 1, seismic data, January to December 2001

    USGS Publications Warehouse

    Nakata, Jennifer S.; Chronological summary by Heliker, C.

    2002-01-01

    The Hawaiian Volcano Observatory (HVO) summary presents seismic data gathered during the year and a chronological narrative describing the volcanic events. The seismic summary is offered without interpretation as a source of preliminary data. It is complete in the sense that all data for events of M>1.5 routinely gathered by the Observatory are included. The emphasis in collection of tilt and deformation data has shifted from quarterly measurements at a few water-tube tilt stations ("wet" tilt) to a larger number of continuously recording borehole tiltmeters, repeated measurements at numerous spirit-level tilt stations ("dry" tilt), and surveying of level and trilateration networks. Because of the large quantity of deformation data now gathered and differing schedules of data reduction, the seismic and deformation summaries are published separately. The HVO summaries have been published in various forms since 1956. Summaries prior to 1974 were issued quarterly, but cost, convenience of preparation and distribution, and the large quantities of data dictated an annual publication beginning with Summary 74 for the year 1974. Summary 86 (the introduction of CUSP at HVO) includes a description of the seismic instrumentation, calibration, and processing used in recent years. The present summary includes enough background information on the seismic network and processing to allow use of the data and to provide an understanding of how they were gathered.

  18. The selective treatment of clinical mastitis based on on-farm culture results: I. Effects on antibiotic use, milk withholding time, and short-term clinical and bacteriological outcomes.

    PubMed

    Lago, A; Godden, S M; Bey, R; Ruegg, P L; Leslie, K

    2011-09-01

    The objective of this multi-state, multi-herd clinical trial was to evaluate the efficacy of using an on-farm culture system to guide strategic treatment decisions in cows with clinical mastitis. The study was conducted in 8 commercial dairy farms ranging in size from 144 to 1,795 cows from Minnesota, Wisconsin, and Ontario, Canada. A total of 422 cows affected with mild or moderate clinical mastitis in 449 quarters were randomly assigned to either (1) a positive-control treatment program or (2) an on-farm, culture-based treatment program. Quarter cases assigned to the positive-control group received immediate on-label intramammary treatment with cephapirin sodium. Quarters assigned to the culture-based treatment program were cultured on-farm and treated with cephapirin sodium after 18 to 24h of incubation if they had gram-positive growth or a mixed infection. Quarters with gram-negative or no growth did not receive intramammary therapy. The proportion of quarter cases assigned to positive-control and culture-based treatments that received intramammary antibiotic therapy because of study assignment was 100 and 44%, respectively; the proportion of cases that received secondary antibiotic therapy was 36 and 19%, respectively; and the proportion of cases that received intramammary antibiotic therapy because of study assignment or secondary therapy was 100 and 51%, respectively. A tendency existed for a decrease in the number of days in which milk was discarded from cows assigned to the culture-based treatment program versus cows assigned to the positive-control group (5.9 vs. 5.2 d). No statistically significant differences existed between cases assigned to the positive-control and cases assigned to the culture-based treatment program in days to clinical cure (2.7 vs. 3.2 d), bacteriological cure risk within 21 d of enrollment (71 vs. 60%), new intramammary infection risk within 21 d of enrollment (50 vs. 50%), and treatment failure risk (presence of infection, secondary treatment, clinical mastitis recurrence, or removal from herd within 21 d after enrollment; 81 vs. 78%). In summary, the use of an on-farm culture system to guide the strategic treatment of clinical mastitis reduced intramammary antibiotic use by half and tended to decrease milk withholding time by 1 d, without significant differences in days to clinical cure, bacteriological cure risk, new intramammary infection risk, and treatment failure risk within 21 d after the clinical mastitis event. Copyright © 2011 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.

  19. 1st Quarter Transportation Report FY2017: Waste Shipments To and From the Nevada National Security Site (NNSS), Radioactive Waste Management Complex

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gregory, Louis

    This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. This report summarizes the 1st quarter of fiscal year (FY) 2017 low-level radioactive waste (LLW), mixed low-level radioactive waste (MLLW) and classified non-radioactive (CNR) shipments. There were no shipments sent for offsite treatment from a NNSS facility and returned to the NNSS this quarter of FY2017.

  20. 77 FR 3035 - Pricing for 2012 Annual Sets and America the Beautiful Quarters® Bags & Rolls

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... DEPARTMENT OF THE TREASURY United States Mint Pricing for 2012 Annual Sets and America the...: Notice. SUMMARY: The United States Mint is announcing 2012 pricing for annual sets and the America the... States Mint Uncirculated Coin Set[supreg] 27.95 2012 United States Mint America the Beautiful Quarters...

  1. 77 FR 840 - Pricing for 2012 America the Beautiful Quarters® Products and American Eagle Silver Dollars

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... DEPARTMENT OF THE TREASURY United States Mint Pricing for 2012 America the Beautiful Quarters.... ACTION: Notice. SUMMARY: The United States Mint is announcing 2012 pricing for America the Beautiful.... Authority: 31 U.S.C. 5111, 5112 & 9701. Dated: December 30, 2011. Al Runnels, Acting Chief of Staff, United...

  2. Electric power quarterly, July-September 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1987-02-04

    The Electric Power Quarterly (EPQ) provides information on electric utilities at the plant level. The information concerns the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Form 423 are presented on a plant-by-plant basis. The EPQ presents a quarterly summary of disturbances andmore » unusual occurrences affecting the electric power industry collected by the Office of International Affairs and Energy Emergencies (IE) on Form IE-417.« less

  3. Financial Implications of the Extended School Year.

    ERIC Educational Resources Information Center

    San Diego Unified School District, CA. Administrative Research Dept.

    This report considers the costs of three types of extended school year programs--all modifications of the quarter system--and compares these costs to the regular program. Compared against the traditional approach are: (1) a quarter system in which students attend three quarters a year and are off one quarter, meaning that 75% of all students are…

  4. An investigation of transitional management problems for the NSTS at NASA, executive summary

    NASA Technical Reports Server (NTRS)

    Hunsucker, John

    1988-01-01

    A summary is given of the work of the University of Houston research team for the third quarter of effort in a yearly grant for the National Space Transportation System (NSTS). As such it serves as a resting place for the ideas and concepts developed this quarter with the collaboration of the Management Integration Offices of NASA. Another objective is the hope that the report will help to stimulate the healthy problem solving process already present at NASA. The main goal of the contractual work is to help NASA to find ways and means of moving into a truly operational era with the shuttle program. This work is a continuation of early work and the reader is encouraged to read the final reports of earlier years. Chapter One of the report is an introduction. Chapter Two deals with industrial adaptation and is in two parts: theory and application. In the theory section, impressions of the management system immediately after reflight are discussed. A key issue, in the author's opinion is the seeming lack of purpose of the program. The application section has six appendices: 1988 Demographic Survey, Field Notes of Interview with HL/P South Texas Nuclear Project, a comparison of the Agendas of the current manager with that of a previous manager, a note on compartmentalization to assist in manifesting, a study on launch prediction for STS-26, and a discussion of a statistical decision-making course for upper level managers. Chapter Three deals with theoretical results returned on flow shop scheduling which will be of use downstream. Chapter Four deals with a statistical model developed to predict the flight rate in future years and indicates the program will have trouble making its schedule. Chapter Five covers the constructural effort and shows the work to be on schedule.

  5. 76 FR 50730 - Information Collection Being Submitted to the Office of Management and Budget for Review and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-16

    ... television programming. The records must be placed in the public file quarterly. The FCC Form 398, Children's Television Programming Reports, reflecting efforts made by the licensee during the preceding quarter, and... placed in the public file quarterly [Children's Television Programming Report (OMB control number 3060...

  6. International oil and gas exploration and development: 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-12-01

    This report starts where the previous quarterly publication ended. This first publication of a new annual series contains most of the same data as the quarterly report, plus some new material, through 1991. It also presents historical data covering a longer period of time than the previous quarterly report. Country-level data on oil reserves, oil production, active drilling rigs, seismic crews, wells drilled, oil reserve additions, and oil reserve-to-production rations (R/P ratios) are listed for about 85 countries, where available, from 1970 through 1991. World and regional summaries are given in both tabular and graphical form. The most popular tablemore » in the previous quarterly report, a listing of new discoveries, continues in this annual report as Appendix A.« less

  7. The Savannah River Site's Groundwater Monitoring Program, third quarter 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

  8. Field Test of Expedient Pavement Repairs (Test Items 16-35).

    DTIC Science & Technology

    1980-11-01

    82 61 Surface Profiles After Repairs, Item 34 ............ ... 83 62 Cracking of Bond, Item 34 ..... ................. . 84 ix JI x LIST OF...Limestone Base Course .... ............... . 79 18 Summary of Test Results ...... .................. . 88 x ABBREVIATIONS AND NOMENCLATURE Abbreviations AFESC...coverage$ Lateral quarter X - M5 coverages -020- - 0.251 +0.10- centerline -0.05- 0 0 I> + o.IO_ quarter point -0.10 -0.20- - 0.25+ TRAFFIC ZONES . Lonituina

  9. The Savannah River Site`s Groundwater Monitoring Program, third quarter 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During third quarter 1991, EPD/EMS conducted extensive sampling of monitoring wells. Analytical results from third quarter 1991 are listed in this report.

  10. Atmospheric Radiation Measurement program climate research facility operations quarterly report January 1 - March 31, 2009.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2009-04-23

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month formore » the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the second quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,052.00 hours (0.95 x 2,160 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,944.00 hours (0.90 x 2,160), and for the Tropical Western Pacific (TWP) locale is 1,836.00 hours (0.85 x 2,160). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because not all of the metadata have been acquired that are used to generate this metric. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 90 days for this quarter) the instruments were operating this quarter. Summary. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period January 1 - March 31, 2009, for the fixed sites. The AMF has completed its mission in China but not all of the data can be released to the public at the time of this report. The second quarter comprises a total of 2,160 hours. The average exceeded our goal this quarter.« less

  11. 47 CFR 79.3 - Video description of video programming.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... programming distributor. (8) Children's Programming. Television programming directed at children 16 years of... provide 50 hours of video description per calendar quarter, either during prime time or on children's... calendar quarter, either during prime time or on children's programming, on each programming stream on...

  12. 47 CFR 79.3 - Video description of video programming.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... programming distributor. (8) Children's Programming. Television programming directed at children 16 years of... provide 50 hours of video description per calendar quarter, either during prime time or on children's... calendar quarter, either during prime time or on children's programming, on each programming stream on...

  13. U.S. Department of Energy Nevada Operations Office Environmental Monitoring Program summary data report, second calendar quarter 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Black, S.C.; Townsend, Y.E.

    1997-02-01

    The Nevada Test Site (NTS), located in southern Nevada, has been the primary location for testing of nuclear explosives in the continental US. Testing began in 1951 and continued until the moratorium in 1992. Waste storage and disposal facilities for defense radioactive and mixed waste are located in Areas 3 and 5. At the Area 5 Radioactive Waste Management Site (RWMS-5), low-level wastes (LLW) from US Department of Energy (DOE) affiliated onsite and offsite generators are disposed of using standard shallow land disposal techniques. Transuranic wastes are retrievably stored at the RWMS-5 in containers on a surface pad, pending shipmentmore » to the Waste Isolation Pilot Plant facility in New Mexico. Nonradioactive hazardous wastes are accumulated at a special site before shipment to a licensed offsite disposal facility. Non-standard packages of LLW are buried in subsidence craters in the Area 3 RWMS. This report describes these activities on and around the NTS and includes a listing of the results obtained from environmental surveillance activities during the second calendar quarter of 1996.« less

  14. Hydrogen energy. A bibliography with abstracts

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Hydrogen Energy is a continuing bibliographic summary with abstracts of research and projections on the subject of hydrogen as a secondary fuel and as an energy carrier. This update to Hydrogen Energy cites additional references identified during the fourth quarter of 1978. It is the fourth in a 1978 quarterly series intended to provide current awareness to those interested in hydrogen energy. A series of cross indexes are included which track directly with those of the cumulative volume.

  15. 1st Quarter Transportation Report FY 2015: Radioactive Waste Shipments to and from the Nevada National Security Site (NNSS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gregory, Louis

    2015-02-20

    This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to and from the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. This report summarizes the 1st quarter of Fiscal Year (FY) 2015 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments. Tabular summaries are provided which include the following: Sources of and carriers for LLW and MLLW shipments tomore » and from the NNSS; Number and external volume of LLW and MLLW shipments; Highway routes used by carriers; and Incident/accident data applicable to LLW and MLLW shipments. In this report shipments are accounted for upon arrival at the NNSS, while disposal volumes are accounted for upon waste burial. The disposal volumes presented in this report include minor volumes of non-radioactive classified waste/material that were approved for disposal (non-radioactive classified or nonradioactive classified hazardous). Volume reports showing cubic feet generated using the Low-Level Waste Information System may vary slightly due to rounding conventions for volumetric conversions from cubic meters to cubic feet.« less

  16. 42 CFR 433.10 - Rates of FFP for program services.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...; (B) 95 percent, for calendar quarters in CY 2017; (C) 94 percent, for calendar quarters in CY 2018... quarters in CY 2018; and (F) 100 percent, for calendar quarters in CY 2019 and all subsequent calendar...

  17. Data Fusion

    DTIC Science & Technology

    2014-05-01

    CDiff Antibiotics) 4.5.3 Preliminary Results of Prototype 1 Figure 5: Mapped Cases of Clostridium difficile by ward over 1 year KGH C. Diff. All...Quarters Figure 6: Mapped Cases of Clostridium difficile by ward over 3 months KGH C. Diff. Q1 Figure 7: Mapped Cases of Methicillin Resistant Staph...Competing Technologies B-2 Schedule Performance Summary B-3 Cost Performance Summary Annex C Publications, Presentations, Patents Bibliography List of

  18. Environmental Hazards Assessment Program. Quarterly report, January 1994--March 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-05-04

    The objectives of the EHAP program are to: Develop a holistic, national basis for risk assessment, risk management and risk communication; Develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects, and; Identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This report describes activities and reports on progress for the third quarter of year two (January-March, 1994) of the grant. To better accomplish objectives, grant efforts are organized into three major elements: The Crossroadsmore » of Humanity Series; Research, Science and Education Programs; and Program Management. The Crossroads of Humanity Series charted a new course, incorporating lessons learned during previous quarters into a series of programs designed to address environmental issues in a real world setting. Reports are included on the various research programs with milestones and deliverables from the third quarter.« less

  19. Secure and Resilient Functional Modeling for Navy Cyber-Physical Systems

    DTIC Science & Technology

    2017-05-24

    932,742 Summary The project was started in this quarter. A kickoff meeting was held on September 26-27 in UCI, where the participants revised the...proposal text together in order to ensure a common understanding of the project content and goals. The document “2016-09-26_ONR_Kickoff_Meeting_UCI.pdf...accounted for in the project plan. Project Goals for this Quarter · Define and propose a concrete use case for the project . (Siemens) · Define the

  20. The Savannah River Site`s Groundwater Monitoring Program. First quarter 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted during the first quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program`s activities; and serves as an official document of the analytical results.

  1. 77 FR 14340 - Proposed Information Collection; Comment Request; Broadband Technology Opportunities Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ... (PPRs) to capture quarterly and annual reports for each project type (Infrastructure, Public Computer... Information Collection; Comment Request; Broadband Technology Opportunities Program (BTOP) Quarterly and..., which included competitive grants to expand public computer center capacity and innovative programs to...

  2. Decontamination systems information and research programs. Quarterly report, July 1--August 31, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-07-01

    The US contains numerous hazardous waste sites. Many sites are on private land near operating units of various companies. An effort is being made to determine the conditions under which such sites can be remediated voluntarily. The objective of the project will be to first assess the interest and willingness of industry in the Kanawha River Valley, WV to participate in discussions that would lead toward voluntary cleanup activities. The second will be to implement the activities agreed upon by the interested parties. The project will first involve individual discussions with the industrial, government, and other organized groups in themore » area. These discussions will help determine the feasibility of organizing voluntary efforts. If the discussions indicate that conditions may be favorable for developing individual or group voluntary cleanup projects, a working group will be convened to establish the environmental goals of the project as well as the technical approach for achieving those goals. The projects for the 1996 WVU Cooperative Agreement are categorized into three task focus areas: Task 1.0 Contaminant Plume Containment and Remediation, Task 2.0 Cross Cutting Innovative Technologies, and Task 3.0 Small Business Support Program. Summaries of the accomplishments for the subtasks reporting under these categories during the third quarter, 1 July 96 through 30 September 96, are presented.« less

  3. Semi-annual report of the Department of Energy Quality Assessment Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sanderson, C.G.; Scarpitta, S.C.

    1992-01-02

    This report presents the results from the analysis of the 35th set of environmental quality assessment samples (QAP XXXV) that were received on or before December 5, 1991. This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s resultsmore » and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 3 days after the reporting deadline via a modem-telephone connection to the EML computer.« less

  4. Semi-annual report of the Department of Energy, Office of Environmental Restoration and Waste Management, Quality Assessment Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sanderson, C.G.; Scarpitta, S.C.

    1992-07-01

    This report presents the results from the analysis of the 36th set of environmental quality assessment samples (QAP 36) that were received on or before January 2, 1992. This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are complied with EML`s resultsmore » and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 3 days after the reporting deadline via a modem-telephone connection to the EML computer.« less

  5. Semi-annual report of the Department of Energy, Office of Environmental Management, Quality Assessment Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sanderson, C.G.; Greenlaw, P.

    1996-02-01

    This report presents the results from the analysis of the 43rd set of environmental quality assessment samples (QAP XLIII) that were received on or before December 1, 1995. This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s resultsmore » and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 2 days after the reporting deadline via a modem-telephone connection to the EML computer.« less

  6. Semi-annual report of the Department of Energy, Office of Environmental Management, Quality Assessment Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sanderson, C.G.; Greenlaw, P.; Pan, V.

    1995-07-03

    This report presents the results from the analysis of the 42st set of environmental quality assessment samples (QAP XLII) that were received on or before June 1, 1995. This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s resultsmore » and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 2 days after the reporting deadline via a modem-telephone connection to the EML computer.« less

  7. Semi-annual report of the Department of Energy, Office of Environmental Management, Quality Assessment Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Greenlaw, P.D.

    1998-01-01

    This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s results and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 4 days after the reporting deadlinemore » via the Internet at www.eml.doe.gov. This report presents the results from the analysis of the 47th set of environmental quality assessment samples (QAP XLVII) that were received on or before December 1, 1997.« less

  8. Semi-annual report of the Department of Energy, Office of Environmental Restoration and Waste Management, Quality Assessment Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sanderson, C.G.; Klusek, C.S.

    1993-07-01

    This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML`s results and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 3 days after the reporting deadlinemore » via a modem-telephone connection to the EML computer. This report presents the results from the analysis of the 38th set of environmental quality assessment samples (QAP XXXVIII) that were received on or before June 2, 1993.« less

  9. 47 CFR 79.3 - Video description of video programming.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... description per calendar quarter, either during prime time or on children's programming; (2) Television... technical capability necessary to pass through the video description, unless using the technology for... video description per calendar quarter during prime time or on children's programming, on each channel...

  10. 47 CFR 79.3 - Video description of video programming.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... description per calendar quarter, either during prime time or on children's programming; (2) Television... technical capability necessary to pass through the video description, unless using the technology for... video description per calendar quarter during prime time or on children's programming, on each channel...

  11. The Savannah River Site`s groundwater monitoring program. First quarter 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by EPD/EMS in the first quarter of 1991. In includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program`s activities and rationale, and serves as an official document of the analytical results.

  12. Biological surveys on the Savannah River in the vicinity of the Savannah River Plant (1951-1976)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, R. A.

    In 1951, the Academy of Natural Sciences of Philadelphia was contracted by the Savannah River Plant to initiate a long-term monitoring program in the Savannah River. The purpose of this program was to determine the effect of the Savannah River Plant on the Savannah River aquatic ecosystem. The data from this monitoring program have been computerized by the Savannah River Laboratory, and are summarized in this report. During the period from 1951-1976, 16 major surveys were conducted by the Academy in the Savannah River. Water chemistry analyses were made, and all major biological communities were sampled qualitatively during the springmore » and fall of each survey year. In addition, quantitative diatom data have been collected quarterly since 1953. Major changes in the Savannah River basin, in the Savannah River Plant's activities, and in the Academy sampling patterns are discussed to provide a historical overview of the biomonitoring program. Appendices include a complete taxonomic listing of species collected from the Savannah River, and summaries of the entire biological and physicochemical data base.« less

  13. ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM QUARTERLY REPORT - OCTOBER 2003

    EPA Science Inventory

    The U.S. EPA Environmental Technology Verification (ETV) Program provides credible performance data for commercial-ready environmental technologies to speed their implementation for the benefit of vendors, purchasers, permitters, and the public. The ETV Quarterly Reports provide...

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1997 is prepared in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data presented constitute the QEDS. The data were received from the contract laboratories, verified by the Weldon Spring Site verification group and, except for air monitoring data and site KPA generated data (uranium analyses), merged into the data base during the fourth quarter of 1997. Air monitoring data presented are the most recent complete sets of quarterly data. Air data are not stored in the data base and KPA data are notmore » merged into the regular data base. Significant data, defined as data values that have exceeded defined ``above normal`` level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits and other guidelines. The procedures also establish actions to be taken in response to such data. Data received and verified during the fourth quarter were within a permissible range of variability except for those which are detailed.« less

  15. AR and TD Fossil Energy Materials Program. Quarterly progress report for the period ending December 31, 1981

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-04-01

    The ORNL Fossil Energy Materials Program Office compiles and issues this combined quarterly progress report from camera-ready copies submitted by each of the participating subcontractor organizations. This report of activities on the program is organized in accordance with a work breakdown structure defined in the AR and TD Fossil Energy Materials Program Plan for FY 1982-1986 in which projects are organized according to fossil energy technologies. This report is divided into parts and chapters with each part describing projects related to a particular fossil energy technology. Chapters within a part provide details of the various projects associated with that technology.more » We hope this series of AR and TD Fossil Energy Materials Program quarterly progress reports will aid in the dissemination of information developed on the program. Plans for the program will be issued annually. A draft of the program plan for FY 1982 to 1986 has been prepared and is in the review process. The implementation of these plans will be reflected by these quarterly progress reports, and this dissemination of information will bw augmented by topical or final reports as appropriate.« less

  16. Price trends for federal-aid highway construction : 1987 base, second quarter 1997

    DOT National Transportation Integrated Search

    1999-03-01

    This summary report highlights the March 1998 Federal Highway Administration (FHWA) scanning team organized to review and document developments in load and resistance factor design (LRFD) methods and alternative contracting practices related to geote...

  17. Assigning a Thesis Project In the Two-Year Architectural Technology Program

    ERIC Educational Resources Information Center

    Obermeyer, Thomas

    1977-01-01

    The "thesis project" assigned in the sixth quarter of the eight-quarter architectural technology program at the Dakota County Area Vocational-Technical Institute in Rosemont, Minnesota, requires the students to design a building for a local public service organization or government agency. The complete project will include a program, a…

  18. 7 CFR Exhibit E to Subpart N of... - Guide For Quarterly Performance Report

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 13 2012-01-01 2012-01-01 false Guide For Quarterly Performance Report E Exhibit E to.... 1944, Subpt. N, Exh. E Exhibit E to Subpart N of Part 1944—Guide For Quarterly Performance Report...: (___% Rate) ___ This Quarter Total ___ B. Use of Program Funds: Budgeted Amount ___ Expended Thru Last...

  19. 7 CFR Exhibit E to Subpart N of... - Guide For Quarterly Performance Report

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 13 2013-01-01 2013-01-01 false Guide For Quarterly Performance Report E Exhibit E to.... 1944, Subpt. N, Exh. E Exhibit E to Subpart N of Part 1944—Guide For Quarterly Performance Report...: (___% Rate) ___ This Quarter Total ___ B. Use of Program Funds: Budgeted Amount ___ Expended Thru Last...

  20. 7 CFR Exhibit E to Subpart N of... - Guide For Quarterly Performance Report

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 13 2014-01-01 2013-01-01 true Guide For Quarterly Performance Report E Exhibit E to.... 1944, Subpt. N, Exh. E Exhibit E to Subpart N of Part 1944—Guide For Quarterly Performance Report...: (___% Rate) ___ This Quarter Total ___ B. Use of Program Funds: Budgeted Amount ___ Expended Thru Last...

  1. Automotive Stirling engine development program

    NASA Technical Reports Server (NTRS)

    Ernst, W.; Richey, A.; Farrell, R.; Riecke, G.; Smith, G.; Howarth, R.; Cronin, M.; Simetkosky, M.; Meacher, J.

    1986-01-01

    This is the ninth Semiannual Technical Progress Report prepared under the Automotive Stirling Engine Development Program. It covers the twenty-eighth and twenty-ninth quarters of activity after award of the contract. Quarterly Technical Progress Reports related program activities from the first through the thirteenth quarters; thereafter, reporting was changed to a Semiannual format. This report summarizes the study of higher-power kinematic Stirling engines for transportation use, development testing of Mod I Stirling engines, and component development activities. Component development testing included successful conical fuel nozzle testing and functional checkout of Mod II controls and auxiliaries on Mod I engine test beds. Overall program philosophy is outlined and data and test results are presented.

  2. Impact of a telehealth and care management program for patients with chronic obstructive pulmonary disease.

    PubMed

    Au, David H; Macaulay, Dendy S; Jarvis, John L; Desai, Urvi S; Birnbaum, Howard G

    2015-03-01

    Improving outcomes and health resource use for patients with chronic obstructive pulmonary disease (COPD) care is a priority for health systems. The Health Buddy Program, a content-driven telehealth system coupled with care management, is designed to enhance patient education, self-management, and timely access to care. To examine the effects of the Health Buddy Program on resource use among Medicare patients with COPD who participated in a Centers for Medicare and Medicaid Services demonstration project from 2006 to 2010. Medicare fee-for-service beneficiaries with COPD who enrolled in the intervention at two participating clinics were propensity-score matched to similar patients with COPD identified from a 5% random sample of Medicare patients. Difference-in-difference analyses descriptively compared the program's effect on quarterly healthcare resource use over the 3-year study period compared with baseline. Negative binomial models estimated the association of the program with healthcare resource outcomes adjusting for significant (P<0.05) baseline differences post matching. The effect of the Health Buddy Program on quarterly all-cause and respiratory-related hospital admissions, hospital admissions for COPD exacerbations, and all-cause emergency department use was assessed after matching. Intervention (n=619) and matched control subjects (n=619) had similar baseline characteristics after matching. The Health Buddy Program was associated with 23% lower quarterly all-cause hospital admissions and 40% lower quarterly respiratory-related hospital admissions compared with baseline for intervention beneficiaries versus control subjects. In subgroup analyses, patients who engaged in the intervention during the study period (n=247) demonstrated significantly lower quarterly hospital admissions for COPD exacerbations. The Health Buddy Program was not associated with reductions in quarterly emergency department use. Results were robust in analyses that adjusted for significant differences in baseline characteristics after matching. A content-driven telehealth system combined with care management has the potential to improve health outcomes in Medicare beneficiaries with COPD.

  3. Calorimetry exchange program amendment to 3rd quarter CY92 report LLNL isotopic data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barnett, T.M.

    1996-08-01

    This report is a series of ammendments to the Calorimetry Exchange Quarterly Data Report for third quarter CY1992. The ammendment is needed due to reporting errors encountered in the Lawrence Livermore National Laboratory isotopic data.

  4. 77 FR 70165 - Proposed Information Collection Activity; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... Quarterly Financial Report. OMB No.: 0970-0205. Description: This is a financial report submitted following... Programs Quarterly 62 4 20 4,960 Financial Report Estimated Total Annual Burden Hours: 4,960. In compliance... requirement to report program expenditures made in the [[Page 70166

  5. The Savannah River Site`s Groundwater Monitoring Program: Third quarter 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rogers, C.D.

    1993-02-04

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During third quarter 1992, EPD/EMS conducted extensive sampling of monitoring wells. Table 1 lists those well series with constituents in the groundwater above Flag 2 during third quarter 1992, organized by location. Results from all laboratory analyses are used to generate this table. Specific conductance and pH data from the field also are included in this table.

  6. Quarterly report for the NGA FFCA project, April 1, 1994--June 30, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-12-31

    Summaries of activities and agendas of meetings related to the National Governor`s Association (NGA) Federal Facilities Compliance Act (FFCA) project are presented. The objective of this project is the management of mixed radioactive and hazardous wastes. Activities included collection and review of state work plans, coordination with the National Association of Attorneys General to identify areas of overlap in working on DOE issues related to environmental management, and the writing of task force meeting summaries for distribution.

  7. Status of ground-water resources at U.S. Navy Support Facility, Diego Garcia; summary of hydrologic and climatic data, January 1994 through June 1996

    USGS Publications Warehouse

    Torikai, J.D.

    1996-01-01

    This report describes the status of ground-water resources at U.S. Navy Support Facility, Diego Garcia. Data presented are from January 1994 through June 1996, with a focus on data from April through June 1996 (second quarter of 1996). A complete database of ground-water withdrawals and chloride-concentration records since 1985 is maintained by the U.S. Geological Survey. Cumulative rainfall for April through June 1996 was 22.64 inches, which is 12 percent more than the mean cumulative rainfall of 20.21 inches for April through June. The period April through June is part of the annual dry season. Ground-water withdrawal during April through June 1996 averaged 1,048,000 gallons per day. Withdrawal for the same 3 months in 1995 averaged 833,700 gallons per day. Withdrawal patterns during the second quarter of 1996 did not change significantly since 1991, with the Cantonment and Air Operations areas supplying about 99 percent of total islandwide pumpage. At the end of June 1996, the chloride concentration of water from the elevated tanks at Cantonment and Air Operations were 52 and 80 milligrams per liter, respectively. The chloride data from all five production areas showed no significant upward or downward trends throughout the second quarter of 1996. Potable levels of chloride concentrations have been maintained by adjusting individual pumping rates, and also because of the absence of long-term droughts. Chloride concentration of ground water in monitoring wells at Cantonment and Air Operations also showed no significant trends throughout the second quarter of 1996. Chloride concentrations have been about the same since the last quarter of 1995. A fuel-pipeline leak at Air Operations in May 1991 decreased total islandwide withdrawals by 15 percent. This lost pumping capacity is being offset by increased pumpage at Cantonment. Six wells do not contribute to the water supply because they are being used to hydraulically divert fuel migration away from water-supply wells by a program of ground-water withdrawal and injection.

  8. Status of ground-water resources at U.S. Navy Support Facility, Diego Garcia; summary of hydrologic and climatic data, January 1994 through March 1996

    USGS Publications Warehouse

    Torikai, J.D.

    1996-01-01

    This report describes the status of ground-water resources at U.S. Navy Support Facility, Diego Garcia. Data presented are from January 1994 through March 1996, with a focus on data from January through March 1996 (first quarter of 1996). A complete database of ground-water withdrawals and chloride-concentration records since 1985 is maintained by the U.S. Geological Survey. Cumulative rainfall for January through March 1996 was about 30 inches, which is 9 percent less than the mean cumulative rainfall of about 33 inches for January through March. The period January through February is the end of the annual wet season, while March marks the start of the annual dry season. Ground-water withdrawal during January through March 1996 averaged 970,300 gallons per day. Withdrawal for the same 3 months in 1995 averaged 894,600 gallons per day. With- drawal patterns during the first quarter of 1996 did not change significantly since 1991, with the Cantonment and Air Operations areas supplying about 99 percent of total islandwide pumpage. At the end of March 1996, the chloride concentration of water from the elevated tanks at Cantonment and Air Operations were 47 and 80 milligrams per liter, respectively. The chloride data from all five production areas showed no significant upward or downward trends throughout the first quarter of 1996. Potable levels of chloride concentrations have been maintained by adjusting individual pumping rates, and also because of the absence of long-term droughts. Chloride concentration of ground water in monitoring wells at Cantonment and Air Operations also showed no significant trends throughout the first quarter of 1996. Chloride concentrations have been about the same since the last quarter of 1995. A fuel-pipeline leak at Air Operations in May 1991 decreased total islandwide withdrawals by 15 percent. This lost pumping capacity is being offset by increased pumpage at Cantonment. Six wells do not contribute to the water supply because they are being used to hydraulically divert fuel migration away from water-supply wells by a program of ground-water withdrawal and injection.

  9. 45 CFR 265.1 - What does this part cover?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...), section 405 (administrative provisions), section 411(b) (report to Congress), and section 413 (annual... oversight responsibilities. (b) This part describes the information in the quarterly and annual reports that... quarterly Data Report, the quarterly Financial Report, and the Annual Report on State MOE Programs, as well...

  10. 45 CFR 265.1 - What does this part cover?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... quarterly Data Report, the quarterly Financial Report, and the Annual Report on State MOE Programs, as well... data in the quarterly TANF Financial Report (or, as applicable, the Territorial Financial Report); and...), section 405 (administrative provisions), section 411(b) (report to Congress), and section 413 (annual...

  11. 30 CFR 1229.109 - Reimbursement for costs incurred by a State under the delegation of authority.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... under the delegation of authority. (a) The Department of the Interior (DOI) shall reimburse the State... DOI and will provide the DOI, on a quarterly basis, a summary of costs incurred for which the State is...

  12. Tribal Colleges Initiative project. Quarterly report, April 1--June 30, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-07-01

    The Tribal Colleges Initiative (TCI) grant is in the second year of funding from the US Department of Energy Environmental Management program. This quarterly report includes activities for the first three months (April 1--June 30, 1998) of the Year 2 funding period. The TCI program office requested each Tribal College to write a quarterly report of activities at their respective institutions. These reports are attached. These institutions are Southwestern Indian Polytechnic Institute (SIPI), Crownpoint Institute of Technology (CIT) and the Dine` College (DC, formerly Navajo Community College). The purpose of this program is to offer educational opportunities to Native Americansmore » in the environmental field.« less

  13. Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4, July 1995--September 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is July through September 1995 (fourth quarter of FY 1995). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995more » commitments.« less

  14. Education Statistics Quarterly, Summer 2002.

    ERIC Educational Resources Information Center

    Dillow, Sally, Ed.

    2002-01-01

    This publication provides a comprehensive overview of work done across all parts of the National Center for Education Statistics (NCES). Each issue contains short publications, summaries, and descriptions that cover all NCES publications, data products, and funding opportunities developed over a 3-month period. Each issue also contains a message…

  15. Education Statistics Quarterly, Spring 2002.

    ERIC Educational Resources Information Center

    Dillow, Sally, Ed.

    2002-01-01

    This publication provides a comprehensive overview of work done across all parts of the National Center for Education Statistics (NCES). Each issue contains short publications, summaries, and descriptions that cover all NCES publications, data products, and funding opportunities developed over a 3-month period. Each issue also contains a message…

  16. Summary of Data on Handicapped Children and Youth.

    ERIC Educational Resources Information Center

    Ashbaugh, John; And Others

    This report provides available data, presented in 64 tables, describing the incidence and prevalence of congenital disabling conditions among children and the characteristics of disabled children and youth and their caretakers. The data cover children living in United States households, institutions and other group quarters, and children…

  17. 75 FR 49931 - Filing Dates for the Illinois Senate Special Election

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-16

    ... FEDERAL ELECTION COMMISSION [Notice 2010--16] Filing Dates for the Illinois Senate Special Election AGENCY: Federal Election Commission. ACTION: Notice of filing dates for special election. SUMMARY... date for each report). Note that these reports are in addition to the campaign committee's quarterly...

  18. Price trends for federal-aid highway construction : 1987 base, fourth quarter 1997

    DOT National Transportation Integrated Search

    2002-12-20

    This document is a summary of the report to Congress titled: "1999 Status of the Nation's Highways, Bridges, and Transit: Conditions and Performance" (C&P report). The C&P report is intended to provide Congress and other decision makers with an objec...

  19. Implementation of a Systematic Accountability Framework in 2014 to Improve the Performance of the Nigerian Polio Program

    PubMed Central

    Tegegne, Sisay G.; MKanda, Pascal; Yehualashet, Yared G.; Erbeto, Tesfaye B.; Touray, Kebba; Nsubuga, Peter; Banda, Richard; Vaz, Rui G.

    2016-01-01

    Background. An accountability framework is a central feature of managing human and financial resources. One of its primary goals is to improve program performance through close monitoring of selected priority activities. The principal objective of this study was to determine the contribution of a systematic accountability framework to improving the performance of the World Health Organization (WHO)–Nigeria polio program staff, as well as the program itself. Methods. The effect of implementation of the accountability framework was evaluated using data on administrative actions and select process indicators associated with acute flaccid paralysis (AFP) surveillance, routine immunization, and polio supplemental immunization activities. Data were collected in 2014 during supportive supervision, using Magpi software (a company that provides service to collect data using mobile phones). A total of 2500 staff were studied. Results. Data on administrative actions and process indicators from quarters 2–4 in 2014 were compared. With respect to administrative actions, 1631 personnel (74%) received positive feedback (written or verbal commendation) in quarter 4 through the accountability framework, compared with 1569 (73%) and 1152 (61%) during quarters 3 and 2, respectively. These findings accorded with data on process indicators associated with AFP surveillance and routine immunization, showing statistically significant improvements in staff performance at the end of quarter 4, compared with other quarters. Conclusions. Improvements in staff performance and process indicators were observed for the WHO-Nigeria polio program after implementation of a systematic accountability framework. PMID:26823334

  20. 7 CFR 1435.301 - Annual estimates and quarterly re-estimates.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS SUGAR PROGRAM Flexible Marketing Allotments For Sugar § 1435.301 Annual estimates and quarterly re-estimates. (a) Not later than August 1... later than the beginning of each quarter of such crop year, the: (1) Quantity of sugar that will be...

  1. 7 CFR 1435.301 - Annual estimates and quarterly re-estimates.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS SUGAR PROGRAM Flexible Marketing Allotments For Sugar § 1435.301 Annual estimates and quarterly re-estimates. (a) Not later than August 1... later than the beginning of each quarter of such crop year, the: (1) Quantity of sugar that will be...

  2. 7 CFR 1435.301 - Annual estimates and quarterly re-estimates.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS SUGAR PROGRAM Flexible Marketing Allotments For Sugar § 1435.301 Annual estimates and quarterly re-estimates. (a) Not later than August 1... later than the beginning of each quarter of such crop year, the: (1) Quantity of sugar that will be...

  3. 7 CFR 1435.301 - Annual estimates and quarterly re-estimates.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS SUGAR PROGRAM Flexible Marketing Allotments For Sugar § 1435.301 Annual estimates and quarterly re-estimates. (a) Not later than August 1... later than the beginning of each quarter of such crop year, the: (1) Quantity of sugar that will be...

  4. 7 CFR 1435.301 - Annual estimates and quarterly re-estimates.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS SUGAR PROGRAM Flexible Marketing Allotments For Sugar § 1435.301 Annual estimates and quarterly re-estimates. (a) Not later than August 1... later than the beginning of each quarter of such crop year, the: (1) Quantity of sugar that will be...

  5. 78 FR 57885 - Report on the Criteria and Methodology for Determining the Eligibility of Candidate Countries for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ...: Sources: Sources: Quarterly reporting Indicator tracking Quarterly tables reporting. Survey of MCC staff Quarterly reporting GAO Audits. Impact evaluations Survey of MCC staff. Similarly, the Board may consider a... reporting, documentation of changes in timing or scope of a threshold program in implementation, a survey of...

  6. Integrated Data Collection Analysis (IDCA) Program — IDCA Quarterly Program Review, September 14 and 15, 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandstrom, Mary M.; Brown, Geoffrey W.; Warner, Kirstin F.

    The IDCA conducted a program review at Los Alamos National Laboratory, September 14 and 15, 2010. The review was divided into three parts: 1) an update on the current status of the program, 2) an information exchange and discussion on technical details for current issues and future planning, and 3) a tour of the SSST testing facilities at LANL. The meeting started with an update from DHS by Laura Parker and a restating of some of the objectives of the Proficiency Test of which the IDCA is currently engaged. This update was followed by a discussion of some high levelmore » programmatic issues particularly about ways of communicating the overall goals of the IDCA to non-technical representatives. The final topic focused on the difficulty of releasing information, including the DHS approval process, ITAR, and open publication. Next JGR presented a technical summary of accomplishments, schedule, milestones, and future directions. These key points made were: 1) about 1/3 of the materials have been tested, 2) some participants are behind others causing a lag in report writing, 3) method reports have been assigned to various participants to speed up the process of reporting, 4) the SSST Compendium needs reformatting and restructuring, and 5) the Compendium needs a web site to house with access control. After the technical update, some of the Proficiency Test results were shown comparing data from the various laboratories. These results included comparisons of the RDX standard, KC/sugar mixtures (-100 mesh and as received), KC/dodecane, KP/Al, and KP/C. Impact, friction, ESD, and DSC results were the focus. All the participants were involved in these discussions. This report includes summary notes, presentations, and explanatory information.« less

  7. The Toxicity Data Landscape for Environmental Chemicals

    PubMed Central

    Judson, Richard; Richard, Ann; Dix, David J.; Houck, Keith; Martin, Matthew; Kavlock, Robert; Dellarco, Vicki; Henry, Tala; Holderman, Todd; Sayre, Philip; Tan, Shirlee; Carpenter, Thomas; Smith, Edwin

    2009-01-01

    Objective Thousands of chemicals are in common use, but only a portion of them have undergone significant toxicologic evaluation, leading to the need to prioritize the remainder for targeted testing. To address this issue, the U.S. Environmental Protection Agency (EPA) and other organizations are developing chemical screening and prioritization programs. As part of these efforts, it is important to catalog, from widely dispersed sources, the toxicology information that is available. The main objective of this analysis is to define a list of environmental chemicals that are candidates for the U.S. EPA screening and prioritization process, and to catalog the available toxicology information. Data sources We are developing ACToR (Aggregated Computational Toxicology Resource), which combines information for hundreds of thousands of chemicals from > 200 public sources, including the U.S. EPA, National Institutes of Health, Food and Drug Administration, corresponding agencies in Canada, Europe, and Japan, and academic sources. Data extraction ACToR contains chemical structure information; physical–chemical properties; in vitro assay data; tabular in vivo data; summary toxicology calls (e.g., a statement that a chemical is considered to be a human carcinogen); and links to online toxicology summaries. Here, we use data from ACToR to assess the toxicity data landscape for environmental chemicals. Data synthesis We show results for a set of 9,912 environmental chemicals being considered for analysis as part of the U.S. EPA ToxCast screening and prioritization program. These include high-and medium-production-volume chemicals, pesticide active and inert ingredients, and drinking water contaminants. Conclusions Approximately two-thirds of these chemicals have at least limited toxicity summaries available. About one-quarter have been assessed in at least one highly curated toxicology evaluation database such as the U.S. EPA Toxicology Reference Database, U.S. EPA Integrated Risk Information System, and the National Toxicology Program. PMID:19479008

  8. International energy indicators

    NASA Astrophysics Data System (ADS)

    Weiss, R. M.

    1981-07-01

    Data are presented in graphs and tables on the following: world crude oil production by area, annually, 1974 through 1980, and monthly, October 1980 through April 1981; OPEC crude oil productive capacity, installed, maximum sustainable, and available, by country; world crude oil and refined product inventory levels, 1975 through 1981; oil consumption in OCED countries, 1975 through 1981; USSR crude oil production and exports, 1975 through April 1981; free world (by country) and US nuclear electricity generation, 1973 through 1980 and January to May 1981 and current capacity by country; US domestic oil supply (monthly) 1977 through 1980; US gross imports of crude oil and products, 1973 and 1974 annually, and 1975 through 1980 and monthly from January to June 1981; cost of Saudi crude oil in current and 1974 dollars from December 1974 through March 1981; US coal trade from January 1975 to March 1981; US natural gas trade from January 1975 through April 1981; summary of US merchandise trade, quarterly, from Quarter I, 1977 through Quarter I, 1981; and US energy/GNP ratio, annually, 1974 through 1980, and quarterly from 1974 through March 1981.

  9. FUEL-FLEXIBLE GASIFICATION-COMBUSTION TECHNOLOGY FOR PRODUCTION OF H2 AND SEQUESTRATION-READY CO2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    George Rizeq; Janice West; Arnaldo Frydman

    It is expected that in the 21st century the Nation will continue to rely on fossil fuels for electricity, transportation, and chemicals. It will be necessary to improve both the thermodynamic efficiency and environmental impact performance of fossil fuel utilization. General Electric Energy and Environmental Research Corporation (GE EER) has developed an innovative fuel-flexible Advanced Gasification-Combustion (AGC) concept to produce H{sub 2} and sequestration-ready CO{sub 2} from solid fuels. The AGC module offers potential for reduced cost and increased energy efficiency relative to conventional gasification and combustion systems. GE EER was awarded a Vision-21 program from U.S. DOE NETL tomore » develop the AGC technology. Work on this three-year program started on October 1, 2000. The project team includes GE EER, California Energy Commission, Southern Illinois University at Carbondale, and T. R. Miles, Technical Consultants, Inc. In the AGC technology, coal/opportunity fuels and air are simultaneously converted into separate streams of (1) pure hydrogen that can be utilized in fuel cells, (2) sequestration-ready CO{sub 2}, and (3) high temperature/pressure oxygen-depleted air to produce electricity in a gas turbine. The process produces near-zero emissions and, based on preliminary modeling work in the first quarter of this program, has an estimated process efficiency of approximately 67% based on electrical and H{sub 2} energy outputs relative to the higher heating value of coal. The three-year R&D program will determine the operating conditions that maximize separation of CO{sub 2} and pollutants from the vent gas, while simultaneously maximizing coal conversion efficiency and hydrogen production. The program integrates lab-, bench- and pilot-scale studies to demonstrate the AGC concept. This is the fifth quarterly technical progress report for the Vision-21 AGC program supported by U.S. DOE NETL (Contract: DE-FC26-00FT40974). This report summarizes program accomplishments for the period starting October 1, 2001 and ending December 31, 2001. The report includes an introduction summarizing the AGC concept, main program tasks, and program objectives; it also provides a summary of program activities covering program management and progress in tasks including lab- and bench-scale experimental testing, pilot-scale design, and economic studies.« less

  10. FUEL-FLEXIBLE GASIFICATION-COMBUSTION TECHNOLOGY FOR PRODUCTION OF H2 AND SEQUESTRATION-READY CO2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    George Rizeq; Janice West; Arnaldo Frydman

    It is expected that in the 21st century the Nation will continue to rely on fossil fuels for electricity, transportation, and chemicals. It will be necessary to improve both the thermodynamic efficiency and environmental impact performance of fossil fuel utilization. General Electric Energy and Environmental Research Corporation (GE EER) has developed an innovative fuel-flexible Advanced Gasification-Combustion (AGC) concept to produce H{sub 2} and sequestration-ready CO{sub 2} from solid fuels. The AGC module offers potential for reduced cost and increased energy efficiency relative to conventional gasification and combustion systems. GE EER was awarded a Vision-21 program from U.S. DOE NETL tomore » develop the AGC technology. Work on this three-year program started on October 1, 2000. The project team includes GE EER, California Energy Commission, Southern Illinois University at Carbondale, and T. R. Miles, Technical Consultants, Inc. In the AGC technology, coal/opportunity fuels and air are simultaneously converted into separate streams of (1) pure hydrogen that can be utilized in fuel cells, (2) sequestration-ready CO{sub 2}, and (3) high temperature/pressure oxygen-depleted air to produce electricity in a gas turbine. The process produces near-zero emissions and, based on preliminary modeling work in the first quarter of this program, has an estimated process efficiency of approximately 67% based on electrical and H{sub 2} energy outputs relative to the higher heating value of coal. The three-year R&D program will determine the operating conditions that maximize separation of CO{sub 2} and pollutants from the vent gas, while simultaneously maximizing coal conversion efficiency and hydrogen production. The program integrates lab-, bench- and pilot-scale studies to demonstrate the AGC concept. This is the seventh quarterly technical progress report for the Vision-21 AGC program supported by U.S. DOE NETL (Contract: DE-FC26-00FT40974). This report summarizes program accomplishments for the period starting April 1, 2002 and ending June 30, 2002. The report includes an introduction summarizing the AGC concept, main program tasks, and program objectives; it also provides a summary of program activities covering program management and progress in tasks including lab-/bench-scale experimental testing and pilot-scale design.« less

  11. FUEL-FLEXIBLE GASIFICATION-COMBUSTION TECHNOLOGY FOR PRODUCTION OF H2 AND SEQUESTRATION-READY CO2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    George Rizeq; Janice West; Arnaldo Frydman

    It is expected that in the 21st century the Nation will continue to rely on fossil fuels for electricity, transportation, and chemicals. It will be necessary to improve both the thermodynamic efficiency and environmental impact performance of fossil fuel utilization. General Electric Energy and Environmental Research Corporation (GE EER) has developed an innovative fuel-flexible Advanced Gasification-Combustion (AGC) concept to produce H{sub 2} and sequestration-ready CO{sub 2} from solid fuels. The AGC module offers potential for reduced cost and increased energy efficiency relative to conventional gasification and combustion systems. GE EER was awarded a Vision-21 program from U.S. DOE NETL tomore » develop the AGC technology. Work on this three-year program started on October 1, 2000. The project team includes GE EER, California Energy Commission, Southern Illinois University at Carbondale, and T. R. Miles, Technical Consultants, Inc. In the AGC technology, coal/opportunity fuels and air are simultaneously converted into separate streams of (1) pure hydrogen that can be utilized in fuel cells, (2) sequestration-ready CO{sub 2}, and (3) high temperature/pressure oxygen-depleted air to produce electricity in a gas turbine. The process produces near-zero emissions and, based on preliminary modeling work in the first quarter of this program, has an estimated process efficiency of approximately 67% based on electrical and H{sub 2} energy outputs relative to the higher heating value of coal. The three-year R&D program will determine the operating conditions that maximize separation of CO{sub 2} and pollutants from the vent gas, while simultaneously maximizing coal conversion efficiency and hydrogen production. The program integrates lab-, bench- and pilot-scale studies to demonstrate the AGC concept. This is the third quarterly technical progress report for the Vision-21 AGC program supported by U.S. DOE NETL (Contract: DE-FC26-00FT40974). This report summarizes program accomplishments for the period starting April 1, 2001 and ending June 30, 2001. The report includes an introduction summarizing the AGC concept, main program tasks, objectives of this program, and provides a summary of program activities covering program management and progress in first year tasks including lab- and bench-scale design, facilities preparation, and engineering studies.« less

  12. Getting Personal: Progress and Pitfalls in HIV Prevention among Latinas

    ERIC Educational Resources Information Center

    Amaro, Hortensia; Raj, Anita; Reed, Elizabeth; Ulibarri, Monica

    2011-01-01

    This article first presents the political, personal, and epidemiological context of Hortensia Amaro's 1988 publication in "Psychology of Women Quarterly" ("PWQ"), "Considerations for Prevention of HIV Infection Among Hispanic Women" (Amaro, 1988). Second, it provides a brief summary of progress in HIV prevention with Latinas. The third section…

  13. Some scale considerations for watercourse restoration and rehabilitation

    Treesearch

    Robert R. Ziemer

    1999-01-01

    Summary - Appropriate temporal and spatial scales vary between rehabilitation objectives. A scale appropriate within a physical or biological context might not be appropriate within a political or social context. For example, corporations and stockholders consider quarterly profits and losses to be an important measure of corporate health. Politicians often focus on...

  14. Annual Coal Distribution

    EIA Publications

    2016-01-01

    The Annual Coal Distribution Report (ACDR) provides detailed information on domestic coal distribution by origin state, destination state, consumer category, and method of transportation. Also provided is a summary of foreign coal distribution by coal-producing state. All data for the report year are final and this report supersedes all data in the quarterly distribution reports.

  15. 76 FR 49757 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-11

    .... SUMMARY: The EIA is soliciting comments on the proposed new Form EIA- 111, ``Quarterly Electricity Imports and Exports Report.'' This new form would supersede the existing Form OE-781R, ``Monthly Electricity... Power Monthly, and Monthly Energy Review. The existing survey of electricity imports and exports (OE...

  16. Education Statistics Quarterly, Fall 2002.

    ERIC Educational Resources Information Center

    Dillow, Sally, Ed.

    2003-01-01

    This publication provides a comprehensive overview of work done across all parts of the National Center for Education Statistics (NCES). Each issue contains short publications, summaries, and descriptions that cover all NCES publications and data products released in a 3-month period. Each issue also contains a message from the NCES on a timely…

  17. Education Statistics Quarterly, Fall 2001.

    ERIC Educational Resources Information Center

    Dillow, Sally, Ed.

    2001-01-01

    The publication gives a comprehensive overview of work done across all parts of the National Center for Education Statistics (NCES). Each issue contains short publications, summaries, and descriptions that cover all NCES publications, data products, and funding opportunities developed over a 3-month period. Each issue also contains a message from…

  18. Education Statistics Quarterly. Volume 5, Issue 1.

    ERIC Educational Resources Information Center

    Dillow, Sally, Ed.

    2003-01-01

    This publication provides a comprehensive overview of work done across all parts of the National Center for Education Statistics (NCES). Each issue contains short publications, summaries, and descriptions that cover all NCES publications, data product, and funding opportunities developed over a 3-month period. Each issue also contains a message…

  19. Education Statistics Quarterly, Winter 2001.

    ERIC Educational Resources Information Center

    Dillow, Sally, Ed.

    2002-01-01

    This publication provides a comprehensive overview of work done across all parts of the National Center for Education Statistics (NCES). Each issue contains short publications, summaries, and descriptions that cover all NCES publications and data products released in a 3-month period. Each issue also contains a message from the NCES on a timely…

  20. The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter, 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-12-31

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria sectionmore » of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.« less

  1. Correlation between quarter-point angle and nuclear radius

    NASA Astrophysics Data System (ADS)

    Ma, Wei-Hu; Wang, Jian-Song; Mukherjee, S.; Wang, Qi; Patel, D.; Yang, Yan-Yun; Ma, Jun-Bing; Ma, Peng; Jin, Shi-Lun; Bai, Zhen; Liu, Xing-Quan

    2017-04-01

    The correlation between quarter-point angle of elastic scattering and nuclear matter radius is studied systematically. Various phenomenological formulae with parameters for nuclear radius are adopted and compared by fitting the experimental data of quarter point angle extracted from nuclear elastic scattering reaction systems. A parameterized formula related to binding energy is recommended, which gives a good reproduction of nuclear matter radii of halo nuclei. It indicates that the quarter-point angle of elastic scattering is quite sensitive to the nuclear matter radius and can be used to extract the nuclear matter radius. Supported by National Natural Science Foundation of China (U1432247, 11575256), National Basic Research Program of China (973 Program)(2014CB845405 and 2013CB83440x) and (SM) Chinese Academy of Sciences President’s International Fellowship Initiative (2015-FX-04)

  2. FETC/EPRI Biomass Cofiring Cooperative Agreement. Quarterly technical report, April 1-June 30, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hughes, E.; Tillman, D.

    1997-12-01

    The FETC/EPRI Biomass Cofiring Program has accelerated the pace of cofiring development by increasing the testing activities plus the support activities for interpreting test results. Past tests conducted and analyzed include the Allen Fossil Plant and Seward Generating Station programs. On-going tests include the Colbert Fossil Plant precommercial test program, the Greenidge Station commercialization program, and the Blount St. Station switchgrass program. Tests in the formative stages included the NIPSCO cofiring test at Michigan City Generating Station. Analytical activities included modeling and related support functions required to analyze the cofiring test results, and to place those results into context. Amongmore » these activities is the fuel availability study in the Pittsburgh, PA area. This study, conducted for Duquesne Light, supports their initial investigation into reburn technology using wood waste as a fuel. This Quarterly Report, covering the third quarter of the FETC/EPRI Biomass Cofiring Program, highlights the progress made on the 16 projects funded under this cooperative agreement.« less

  3. Summary of flat-plate solar array project documentation: Abstracts of published documents, 1975-1986, revision 1

    NASA Technical Reports Server (NTRS)

    Phillips, M. J.

    1986-01-01

    Abstracts of final reports, or the latest quarterly or annual, of the Flat-Plate Solar Array (FSA) Project Contractor of Jet Propulsion Laboratory (JPL) in-house activities are presented. Also presented is a list of proceedings and publications, by author, of work connected with the project. The aim of the program has been to stimulate the development of technology that will enable the private sector to manufacture and widely use photovoltaic systems for the generation of electricity in residential, commercial, industrial, and Government applications at a cost per watt that is competitive with utility generated power. FSA Project activities have included the sponsoring of research and development efforts in silicon refinement processes, advanced silicon sheet growth techniques, higher efficiency solar cells, solar cell/module fabrication processes, encapsulation, module/array engineering and reliability, and economic analyses.

  4. Hawaiian Volcano Observatory seismic data, January to December 2005

    USGS Publications Warehouse

    Nakata, Jennifer S.

    2006-01-01

    The Hawaiian Volcano Observatory (HVO) summary presents seismic data gathered during the year. The seismic summary is offered without interpretation as a source of preliminary data. It is complete in the sense that most data for events of M-1.5 routinely gathered by the Observatory are included. The HVO summaries have been published in various forms since 1956. Summaries prior to 1974 were issued quarterly, but cost, convenience of preparation and distribution, and the large quantities of data dictated an annual publication beginning with Summary 74 for the year 1974. Summary 86 (the introduction of CUSP at HVO) includes a description of the seismic instrumentation, calibration, and processing used in recent years. Beginning with 2004, summaries will simply be identified by the year, rather than Summary number. The present summary includes background information on the seismic network and processing to allow use of the data and to provide an understanding of how they were gathered. A report by Klein and Koyanagi (1980) tabulates instrumentation, calibration, and recording history of each seismic station in the network. It is designed as a reference for users of seismograms and phase data and includes and augments the information in the station table in this summary.

  5. Hawaiian Volcano Observatory Seismic Data, January to December 2006

    USGS Publications Warehouse

    Nakata, Jennifer

    2007-01-01

    Introduction The Hawaiian Volcano Observatory (HVO) summary presents seismic data gathered during the year. The seismic summary is offered without interpretation as a source of preliminary data. It is complete in the sense that most data for events of M>1.5 routinely gathered by the Observatory are included. The HVO summaries have been published in various forms since 1956. Summaries prior to 1974 were issued quarterly, but cost, convenience of preparation and distribution, and the large quantities of data dictated an annual publication beginning with Summary 74 for the year 1974. Summary 86 (the introduction of CUSP at HVO) includes a description of the seismic instrumentation, calibration, and processing used in recent years. Beginning with 2004, summaries are simply identified by the year, rather than Summary number. The present summary includes background information on the seismic network and processing to allow use of the data and to provide an understanding of how they were gathered. A report by Klein and Koyanagi (1980) tabulates instrumentation, calibration, and recording history of each seismic station in the network. It is designed as a reference for users of seismograms and phase data and includes and augments the information in the station table in this summary.

  6. Four-Quarter School Year. Results of an Exploratory Study of the Four-Quarter School Year in Metropolitan Atlanta.

    ERIC Educational Resources Information Center

    Bentley, Ernest L; And Others

    Six Atlanta, Georgia, school systems initiated a four-quarter school year program in 1968-69. An exploratory study was conducted to develop procedures and instruments for a comprehensive examination of the plan. Strong support exists in all groups interviewed -- superintendents and steering committee members, students, parents, teachers,…

  7. Defense Attache Saigon: RNAVF Quarterly Assessment. 2nd Quarter FY74.

    DTIC Science & Technology

    1974-02-01

    Military Assistance Command Vietnam MAP Military Assistance Program UNCLASSIFIED F IUNCLASSIFIES MASI Military Assistance Service Funded MATT Military Air...8217 operating the school. The average yearly budget is 2,~4oo,000 piasters, whiuh averages out to less than five cents per student per day. This is... average daily cargo handling rate of 959 M/T for the 2nd quarter FY711 shows continued improvement over the 773 M/T rate attained during the 1st quarter

  8. 78 FR 77191 - Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-20

    ... Effectiveness of a Proposed Rule Relating to the Quarterly Option Series Program December 16, 2013. Pursuant to... the Quarterly Options Series (``QOS'') Program to eliminate the cap on the number of additional series... eliminate the cap on the number of additional series that may be listed per expiration month for each QOS in...

  9. Impact of community tracer teams on treatment outcomes among tuberculosis patients in South Africa.

    PubMed

    Bronner, Liza E; Podewils, Laura J; Peters, Annatjie; Somnath, Pushpakanthi; Nshuti, Lorna; van der Walt, Martie; Mametja, Lerole David

    2012-08-07

    Tuberculosis (TB) indicators in South Africa currently remain well below global targets. In 2008, the National Tuberculosis Program (NTP) implemented a community mobilization program in all nine provinces to trace TB patients that had missed a treatment or clinic visit. Implementation sites were selected by TB program managers and teams liaised with health facilities to identify patients for tracing activities. The objective of this analysis was to assess the impact of the TB Tracer Project on treatment outcomes among TB patients. The study population included all smear positive TB patients registered in the Electronic TB Registry from Quarter 1 2007-Quarter 1 2009 in South Africa. Subdistricts were used as the unit of analysis, with each designated as either tracer (standard TB program plus tracer project) or non-tracer (standard TB program only). Mixed linear regression models were utilized to calculate the percent quarterly change in treatment outcomes and to compare changes in treatment outcomes from Quarter 1 2007 to Quarter 1 2009 between tracer and non-tracer subdistricts. For all provinces combined, the percent quarterly change decreased significantly for default treatment outcomes among tracer subdistricts (-0.031%; p < 0.001) and increased significantly for successful treatment outcomes among tracer subdistricts (0.003%; p = 0.03). A significant decrease in the proportion of patient default was observed for all provinces combined over the time period comparing tracer and non-tracer subdistricts (p = 0.02). Examination in stratified models revealed the results were not consistent across all provinces; significant differences were observed between tracer and non-tracer subdistricts over time in five of nine provinces for treatment default. Community mobilization of teams to trace TB patients that missed a clinic appointment or treatment dose may be an effective strategy to mitigate default rates and improve treatment outcomes. Additional information is necessary to identify best practices and elucidate discrepancies across provinces; these findings will help guide the NTP in optimizing the adoption of tracing activities for TB control.

  10. Rural Matters: The Rural Challenge News, 1997-2000.

    ERIC Educational Resources Information Center

    Rural Matters: The Rural Challenge News, 2000

    2000-01-01

    This document contains the 10 quarterly issues of "Rural Matters: The Rural Challenge News," published from Fall 1997 to Winter 2000 (the final issue). This newsletter focused on projects funded by the Annenberg Rural Challenge, as well as research summaries and opinion pieces on the benefits of small schools, place-based education, and…

  11. Executive Summary: Professional Partners Supporting Family Caregivers

    ERIC Educational Resources Information Center

    Kelly, Kathleen; Reinhard, Susan C.; Brooks-Danso, Ashley

    2008-01-01

    Today, more than three-quarters of adults who live in the community and need long-term care depend on family and friends as their only source of assistance with activities of daily living (such as bathing, dressing, and eating) or instrumental activities of daily living (such as transportation and managing finances). Research suggests that the…

  12. Assessing Effectiveness and Efficiency of Academic Interventions in School Psychology Journals: 1995-2005

    ERIC Educational Resources Information Center

    Bramlett, Ron; Cates, Gary L.; Savina, Elena; Lauinger, Brittni

    2010-01-01

    This article reviews research in the four major school psychology journals: "Journal of School Psychology," "Psychology in the Schools," "School Psychology Quarterly," and "School Psychology Review." The function of the review was to provide school psychologists with a summary of academic interventions published through years 1995-2005, synthesize…

  13. 7 CFR 1951.220 - General servicing actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... statement period is from January 1 through December 31. The Finance Office forwards to field offices a copy...) Quarterly Forms FmHA or its successor agency under Public Law 103-354 1951-9 are retained in the Finance... for Loan Summary Statement,” to the Finance Office. (3) The servicing office will provide a copy of...

  14. 78 FR 6133 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Fire...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-29

    ... for OMB Review; Comment Request; Fire Protection in Underground Coal Mines ACTION: Notice. SUMMARY... information collection request (ICR) revision titled, ``Fire Protection in Underground Coal Mines,'' to the... sections of part 75 require fire drills to be conducted quarterly, equipment to be tested, and a record to...

  15. 75 FR 22101 - Proposed Information Collection; Comment Request; Survey: Institutional Remittances to Foreign...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-27

    ... the Bureau of Economic Analysis (BEA) for compiling the U.S. international transactions accounts (ITAs), which BEA publishes quarterly in news releases, on its Web site, and in its monthly journal, the Survey of Current Business. These accounts provide a statistical summary of all U.S. international...

  16. 77 FR 54887 - Proposed Information Collection; Comment Request; 2013 Census Test

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-06

    ... Test will inform Census Bureau planners who are guiding the design of additional 2020 Decennial Census.... Current plans do not target Tribal sites and group quarters addresses for this test due to limitations of... Test AGENCY: U.S. Census Bureau, Commerce. ACTION: Notice. SUMMARY: The Department of Commerce, as part...

  17. Education Statistics Quarterly. Volume 4 Issue 4, 2002.

    ERIC Educational Resources Information Center

    National Center for Education Statistics, 2002

    2002-01-01

    This publication provides a comprehensive overview of work done across all parts of the National Center for Education Statistics (NCES). Each issue contains short publications, summaries, and descriptions that cover all NCES publications and data products released in a 3-month period. Each issue also contains a message from the NCES on a timely…

  18. Focus on Adoption.

    ERIC Educational Resources Information Center

    Child Welfare Information Services, Inc., New York, NY.

    This report consists of three charts which present data on adoption patterns in New York City in the year 1976. The report is based on quarterly Child Welfare Information Service (CWIS) reports developed by Dave Fanshel and John Grundy. Each chart is accompanied by a brief explanatory text, and a summary of the findings. The charts present data on…

  19. The magnetohydrodynamics coal-fired flow facility

    NASA Astrophysics Data System (ADS)

    1995-01-01

    In this quarterly technical progress report, UTSI reports on the status of a multitask contract to develop the technology for the steam bottoming portion of a MHD Steam Combined Cycle Power Plant. The report describes the facility maintenance and environmental work completed, status of completing technical reports and certain key administrative actions occurring during the quarter. With program resources at a minimum to closeout the MHD program, no further testing occurred during the quarter, but the DOE CFFF facility was maintained in a standby status with winterization, preventive maintenance and repairs accomplished as needed. Plans and preparations progressed for environmental actions needed at the site to investigate and characterize the groundwater and for removal/disposal of asbestos in the cooling tower. Work continued to progress on archiving the results of the MHD program.

  20. Lawrence Livermore National Laboratory safeguards and security quarterly progress report to the US Department of Energy quarter ending September 30, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, G.; Mansur, D.L.; Ruhter, W.D.

    1994-10-01

    This report presents the details of the Lawrence Livermore National Laboratory safeguards and securities program. This program is focused on developing new technology, such as x- and gamma-ray spectrometry, for measurement of special nuclear materials. This program supports the Office of Safeguards and Securities in the following five areas; safeguards technology, safeguards and decision support, computer security, automated physical security, and automated visitor access control systems.

  1. NAWIG News: The Quarterly Newsletter of the Native American Wind Interest Group, Summer 2007

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    DOE's Wind Powering America program has initiated a quarterly NAWIG newsletter to present Native American wind information, including projects, interviews with pioneers, issues, WPA activities, and related events.

  2. Summary Report on Solid-oxide Electrolysis Cell Testing and Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J.E. O'Brien; X. Zhang; R.C. O'Brien

    2012-01-01

    Idaho National Laboratory (INL) has been researching the application of solid-oxide electrolysis cells (SOECs) for large-scale hydrogen production from steam over a temperature range of 800 to 900 C. From 2003 to 2009, this work was sponsored by the United States Department of Energy Nuclear Hydrogen Initiative, under the Office of Nuclear Energy. Starting in 2010, the high-temperature electrolysis (HTE) research program has been sponsored by the INL Next Generation Nuclear Plant Project. This report provides a summaryof program activities performed in Fiscal Year (FY) 2011 and the first quarter of FY-12, with a focus on small-scale testing and cellmore » development activities. HTE research priorities during this period have included the development and testing of SOEC and stack designs that exhibit high-efficiency initial performance and low, long-term degradation rates. This report includes contributions from INL and five industry partners: Materials and Systems Research, Incorporated (MSRI); Versa Power Systems, Incorporated (VPS); Ceramatec, Incorporated; National Aeronautics and Space Administration - Glenn Research Center (NASA - GRC); and the St. Gobain Advanced Materials Division. These industry partners have developed SOEC cells and stacks for in-house testing in the electrolysis mode and independent testing at INL. Additional fundamental research and post-test physical examinations have been performed at two university partners: Massachusetts Institute of Technology (MIT) and the University of Connecticut. Summaries of these activities and test results are also presented in this report.« less

  3. 78 FR 26038 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-January Through March 2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... provisions of the Social Security Act (the Act) and Public Health Service Act. We also issue various manuals...-month period along with a hyperlink to the full listing that is available on the CMS Web site or the... information and will be available earlier than we publish our quarterly notice. We believe the Web site list...

  4. 78 FR 67153 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-July Through September 2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ... provisions of the Social Security Act (the Act) and Public Health Service Act. We also issue various manuals...-month period along with a hyperlink to the full listing that is available on the CMS Web site or the... information and will be available earlier than we publish our quarterly notice. We believe the Web site list...

  5. 78 FR 45233 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-April Through June 2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... provisions of the Social Security Act (the Act) and Public Health Service Act. We also issue various manuals...-month period along with a hyperlink to the full listing that is available on the CMS Web site or the... information and will be available earlier than we publish our quarterly notice. We believe the Web site list...

  6. Amarillo National Resource Center for Plutonium quarterly technical progress report, August 1, 1997--October 31, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This report summarizes activities of the Amarillo National Resource Center for Plutonium during the quarter. The report describes the Electronic Resource Library; DOE support activities; current and future environmental health and safety programs; pollution prevention and pollution avoidance; communication, education, training, and community involvement programs; and nuclear and other material studies, including plutonium storage and disposition studies.

  7. Implementation of the first worldwide quality assurance program for cystic fibrosis multiple mutation detection in population-based screening.

    PubMed

    Earley, Marie C; Laxova, Anita; Farrell, Philip M; Driscoll-Dunn, Rena; Cordovado, Suzanne; Mogayzel, Peter J; Konstan, Michael W; Hannon, W Harry

    2011-07-15

    CDC's Newborn Screening Quality Assurance Program collaborated with several U.S. Cystic Fibrosis Care Centers to collect specimens for development of a molecular CFTR proficiency testing program using dried-blood spots for newborn screening laboratories. Adult and adolescent patients or carriers donated whole blood that was aliquoted onto filter paper cards. Five blind-coded specimens were sent to participating newborn screening laboratories quarterly. Proficiency testing results were evaluated based on presumptive clinical assessment. Individual evaluations and summary reports were sent to each participating laboratory and technical consultations were offered if incorrect assessments were reported. The current CDC repository contains specimens with 39 different CFTR mutations. Up to 45 laboratories have participated in the program. Three years of data showed that correct assessments were reported 97.7% of the time overall when both mutations could be determined. Incorrect assessments that could have lead to a missed case occurred 0.9% of the time, and no information was reported 1.1% of the time due to sample failure. Results show that laboratories using molecular assays to detect CFTR mutations are performing satisfactorily. The programmatic results presented demonstrate the importance and complexity of providing proficiency testing for DNA-based assays. Published by Elsevier B.V.

  8. ITS at a glance, volume 1, number 1.

    DOT National Transportation Integrated Search

    1996-04-01

    ITS at a glance is a quarterly newsletter produced by the U.S. Department of Transportation's Intelligent Transportation Systems (ITS) Joint Program Office (JPO). This quarterly publication will highlight and share major ITS developments within USDOT...

  9. The Savannah River Site`s Groundwater Monitoring Program, first quarter 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During first quarter 1989 (January--March), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking watermore » standards. An explanation of flagging criteria for the first quarter is presented in the Flagging Criteria section of this document. All analytical results from first quarter 1989 are listed in this report, which is distributed to all waste-site custodians.« less

  10. The Savannah River Site`s Groundwater Monitoring Program, third quarter 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During third quarter 1989 (July--September), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, backgroundmore » levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the third quarter is presented in the Flagging Criteria section of this document. All analytical results from third quarter 1989 are listed in this report, which is distributed to all waste-site custodians.« less

  11. The Savannah River Site's Groundwater Monitoring Program, third quarter 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During third quarter 1989 (July--September), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, backgroundmore » levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the third quarter is presented in the Flagging Criteria section of this document. All analytical results from third quarter 1989 are listed in this report, which is distributed to all waste-site custodians.« less

  12. The Savannah River Site's Groundwater Monitoring Program, first quarter 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During first quarter 1989 (January--March), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking watermore » standards. An explanation of flagging criteria for the first quarter is presented in the Flagging Criteria section of this document. All analytical results from first quarter 1989 are listed in this report, which is distributed to all waste-site custodians.« less

  13. Marshall Space Flight Center Engineering Directorate Overview: Launching the Future of Science and Exploration

    NASA Technical Reports Server (NTRS)

    Miley, Steven C.

    2009-01-01

    The Marshall Small Business Association (MSBA) serves as a central point of contact to inform and educate small businesses interested in pursuing contracting and subcontracting opportunities at the Marshall Space Flight Center. The MSBA meets quarterly to provide industry with information about how to do business with Marshall and to share specific information about Marshall s mission, which allows private businesses to envision how they might contribute. For the February 19 meeting, the Engineering Directorate will give an overview of its unique capabilities and how it is organized to provide maximum support for the programs and projects resident at Marshall, for example, the Space Shuttle Propulsion Office, Ares Projects Office, and Science and Mission Systems Office. This briefing provides a top-level summary of the work conducted by Marshall s largest organization, while explaining how resources are deployed to perform the volume of work under Marshall s purview.

  14. Columbia Plateau Basin and Fifteenmile Subbasin Water Rights Acquisitons; Oregon Water Trust Combined Work Plan, 2002-2003 Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Paulus, Fritz

    2003-12-01

    This is the Final Report submitted regarding Oregon Water Trust's Combined Work Plan for fiscal year 2003, with the contract period April 2002 to May 2003. Of this 12 month period, six month were spent concluding our work for the 2002 irrigation season and six months were spent preparing for the 2003 irrigation season. After this grant was completed, projects were finished with funding from the Columbia Basin Water Transactions Program. Many of the 2003 irrigation season successes began in the fall of 2002, when projects were researched and partnerships were developed. Trout Creek Ranch was one of the largemore » successes. During the 2003 irrigation season, 2.6 cfs was leased which led to a permanent instream transfer, protecting critical spawning habitat for summer steelhead in the Deschutes basin. Another success was the Walla Walla Lease Bank project. This project is an agreement between the OWT, the Walla Walla Irrigation District and 11 individual landowners. Through this single year lease, 7.9 cfs of water was legally protected in the Walla Walla River. The Vidando lease on Middle Fork John Day River was renewed for 2 more years, protecting 11.29 cfs. An innovative single year split-season lease was conducted with Voight on Standard Creek in the John Day basin to protect 4.93 cfs. Many other deals were conducted and the total was an impressive 50.43 cfs instream during 2003 and 9.39 cfs pending approval for the 2004 season. Included is a summary of the activities within the Fifteenmile subbasin and the Columbia Plateau basin by quarter and two tables. The summary of activities is broken down by objectives and quarters. The first summarizes the total cfs by type of lease or transfer. The second table lists all the projects by subbasin and provides project type, lease number, cfs, cost of acquisition, partners in the project and funding source.« less

  15. Space Communications

    DTIC Science & Technology

    1977-06-15

    MASSACHUSETTS INSTITUTE OF TECHNOLOGY LINCOLN LABORATORY SPACE COMMUNICATIONS QUARTERLY TECHNICAL SUMMARY REPORT TO THE AIR FORCE...Massachusetts Institute of Technology, with the support of the Department of the Air Force under Contract F19628-76-C-0002. This report may be...four areas: support of communications-link testing by outside agencies, cooperative jamming tests, bit-error-rate measurements on the Air Force

  16. 76 FR 59719 - Notice of Regulatory Waiver Requests Granted for the Second Quarter of Calendar Year 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-27

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5529-N-02] Notice of Regulatory Waiver.... ACTION: Notice. SUMMARY: Section 106 of the Department of Housing and Urban Development Reform Act of..., Department of Housing and Urban Development, 451 7th Street, SW., Room 10282, Washington, DC 20410- 0500...

  17. Educational and Labor Market Performance of GED Recipients. Research Synthesis. Executive Summary.

    ERIC Educational Resources Information Center

    Boesel, David; Alsalam, Nabeel; Smith, Thomas M.

    In 1995, nearly three-quarters of a million high school dropouts took the General Educational Development (GED) tests. The half million individuals who passed the test accounted for approximately one-sixth of all high school diplomas issued that year. On average, GED recipients perform as well as graduating high school seniors on the five tests…

  18. 78 FR 5167 - BE-9: Quarterly Survey of Foreign Airline Operators' Revenues and Expenses in the United States

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-24

    ... DEPARTMENT OF COMMERCE Bureau of Economic Analysis [Docket No. 130111032-3032-01] XRIN 0691-XC003... AGENCY: Bureau of Economic Analysis, Commerce. ACTION: Notice of reporting requirements. SUMMARY: By this Notice, the Bureau of Economic Analysis (BEA), Department of Commerce is informing the public that it is...

  19. Cigarette continuity programs and social support for smoking.

    PubMed

    Sumner, W; Dunaway, M; Dillman, D G

    1998-01-01

    To describe smokers' participation in cigarette continuity programs and the prevalence and structure of cooperative teams of smokers. Cross-sectional survey of smoking histories and continuity-program participation by individuals and their family members in a convenience sample of 176 current smokers at the University of Kentucky Chandler Medical Center, Lexington. Fisher exact test or chi2 tests were used to compare proportions. One of 3 smokers collected coupons for a continuity program. Three quarters of the collectors redeemed their own coupons, and one quarter gave coupons to another collector. Coupon collectors reported an average team size of more than 2 members. One fifth of collectors were teammates with another generation of family members, and one quarter of collectors aged 24 to 35 years were teammates with their children. Smokers were often aware of their relatives' coupon-collecting habits. Continuity programs have been a popular means of reinforcing smoking, especially within families and groups of friends. Continuity programs are novel in encouraging smoking and brand loyalty between generations. Continuity-program participants need to be aware of the risk of promoting smoking initiation by their children. Health advocates could use similar strategies to promote smoking cessation and prevention within families and other social groups.

  20. Assessing the quality of data aggregated by antiretroviral treatment clinics in Malawi.

    PubMed

    Makombe, Simon D; Hochgesang, Mindy; Jahn, Andreas; Tweya, Hannock; Hedt, Bethany; Chuka, Stuart; Yu, Joseph Kwong-Leung; Aberle-Grasse, John; Pasulani, Olesi; Bailey, Christopher; Kamoto, Kelita; Schouten, Erik J; Harries, Anthony D

    2008-04-01

    As national antiretroviral treatment (ART) programmes scale-up, it is essential that information is complete, timely and accurate for site monitoring and national planning. The accuracy and completeness of reports independently compiled by ART facilities, however, is often not known. This study assessed the quality of quarterly aggregate summary data for April to June 2006 compiled and reported by ART facilities ("site report") as compared to the "gold standard" facility summary data compiled independently by the Ministry of Health supervision team ("supervision report"). Completeness and accuracy of key case registration and outcome variables were compared. Data were considered inaccurate if variables from the site reports were missing or differed by more than 5% from the supervision reports. Additionally, we compared the national summaries obtained from the two data sources. Monitoring and evaluation of Malawi's national ART programme is based on WHO's recommended tools for ART monitoring. It includes one master card for each ART patient and one patient register at each ART facility. Each quarter, sites complete cumulative cohort analyses and teams from the Ministry of Health conduct supervisory visits to all public sector ART sites to ensure the quality of reported data. Most sites had complete case registration and outcome data; however many sites did not report accurate data for several critical data fields, including reason for starting, outcome and regimen. The national summary using the site reports resulted in a 12% undercount in the national total number of persons on first-line treatment. Several facility-level characteristics were associated with data quality. While many sites are able to generate complete data summaries, the accuracy of facility reports is not yet adequate for national monitoring. The Ministry of Health and its partners should continue to identify and support interventions such as supportive supervision to build sites' capacity to maintain and compile quality data to ensure that accurate information is available for site monitoring and national planning.

  1. Impact of community tracer teams on treatment outcomes among tuberculosis patients in South Africa

    PubMed Central

    2012-01-01

    Background Tuberculosis (TB) indicators in South Africa currently remain well below global targets. In 2008, the National Tuberculosis Program (NTP) implemented a community mobilization program in all nine provinces to trace TB patients that had missed a treatment or clinic visit. Implementation sites were selected by TB program managers and teams liaised with health facilities to identify patients for tracing activities. The objective of this analysis was to assess the impact of the TB Tracer Project on treatment outcomes among TB patients. Methods The study population included all smear positive TB patients registered in the Electronic TB Registry from Quarter 1 2007-Quarter 1 2009 in South Africa. Subdistricts were used as the unit of analysis, with each designated as either tracer (standard TB program plus tracer project) or non-tracer (standard TB program only). Mixed linear regression models were utilized to calculate the percent quarterly change in treatment outcomes and to compare changes in treatment outcomes from Quarter 1 2007 to Quarter 1 2009 between tracer and non-tracer subdistricts. Results For all provinces combined, the percent quarterly change decreased significantly for default treatment outcomes among tracer subdistricts (−0.031%; p < 0.001) and increased significantly for successful treatment outcomes among tracer subdistricts (0.003%; p = 0.03). A significant decrease in the proportion of patient default was observed for all provinces combined over the time period comparing tracer and non-tracer subdistricts (p = 0.02). Examination in stratified models revealed the results were not consistent across all provinces; significant differences were observed between tracer and non-tracer subdistricts over time in five of nine provinces for treatment default. Conclusions Community mobilization of teams to trace TB patients that missed a clinic appointment or treatment dose may be an effective strategy to mitigate default rates and improve treatment outcomes. Additional information is necessary to identify best practices and elucidate discrepancies across provinces; these findings will help guide the NTP in optimizing the adoption of tracing activities for TB control. PMID:22871071

  2. Allegations of children's involvement in ritual sexual abuse: clinical experience of 20 cases.

    PubMed

    Weir, I K; Wheatcroft, M S

    1995-04-01

    Twenty cases were evaluated in which allegations had been made of children being involved in ritual sexual abuse (RSA). A selection of case histories are presented together with a summary of the salient points in the other cases. Using a standard format developed for assessing the validity of allegations in sexual abuse cases, it was concluded that false allegations of ritual sexual abuse occurred in three-quarters of the cases and true allegations only in one-quarter. This high rate of false allegations is unlike the author's clinical experience in other cases of child sexual abuse where the rate of false allegations is much lower and similar to other published series. Reasons for the high rate of false allegations are discussed.

  3. 45 CFR 308.2 - Required program compliance criteria.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., State employment security agency, employment data, Department of Motor Vehicles, and credit bureaus... vehicles, and credit bureaus; (ii) Repeating attempts to locate quarterly and when new information is..., Department of Motor Vehicles, and credit bureaus; (ii) Repeating location attempts quarterly and when new...

  4. Timing and effect of a safe routes to school program on child pedestrian injury risk during school travel hours: Bayesian changepoint and difference-in-differences analysis.

    PubMed

    DiMaggio, Charles; Chen, Qixuan; Muennig, Peter A; Li, Guohua

    2014-12-01

    In 2005, the US Congress allocated $612 million for a national Safe Routes to School (SRTS) program to encourage walking and bicycling to schools. We evaluated the effectiveness of a SRTS in controlling pedestrian injuries among school-age children. Bayesian changepoint analysis was applied to model the quarterly counts of pedestrian injuries among 5- to 19-year old children in New York City between 2001 and 2010 during school-travel hours in census tracts with and without SRTS. Overdispersed Poisson model was used to estimate difference-in-differences in injury risk between census tracts with and without SRTS following the changepoint. In SRTS-intervention census tracts, a change point in the quarterly counts of injuries was identified in the second quarter of 2008, which was consistent with the timing of the implementation of SRTS interventions. In census tracts with SRTS interventions, the estimated quarterly rates of pedestrian injury per 10,000 population among school-age children during school-travel hours were 3.47 (95% Credible Interval [CrI] 2.67, 4.39) prior to the changepoint, and 0.74 (95% CrI 0.30, 1.50) after the changepoint. There was no change in the average number of quarterly injuries in non-SRTS census tracts. Overdispersed Poisson modeling revealed that SRTS implementation was associated with a 44% reduction (95% Confidence Interval [CI] 87% decrease to 130% increase) in school-age pedestrian injury risk during school-travel hours. Bayesian changepoint analysis of quarterly counts of school-age pedestrian injuries successfully identified the timing of SRTS intervention in New York City. Implementation of the SRTS program in New York City appears to be effective in reducing school-age pedestrian injuries during school-travel hours.

  5. Summary of the Spring Quarter 1971: Faculty Time Use Study at Humboldt State College.

    ERIC Educational Resources Information Center

    Lawson, Donald F.

    Due to public misunderstanding of the unit-load measurement versus the hours per week standard of work measurement, a study was conducted at Humboldt State College to determine the average number of hours a full-time instructional faculty member spends in performing his job. Faculty activity data was collected by means of a daily-diary form of…

  6. Space Communications

    DTIC Science & Technology

    1977-03-15

    Current capabilities of solid-state power devices (IMPATTs, bipolar, and field- effect tran- sistors) have been reviewed with regard to use in space ...Quarterly Technical Summary CO CD > -n_ or CJ> Space Communications Prepared for the Department of the Air Force under Electronic Systems...document when it is no longer needed. mm .■ ■■■ ■ ■ MASSACHUSETTS INSTITUTE OF TECHNOLOGY LINCOLN LABORATORY SPACE COMMUNICATIONS

  7. Perspective: The potential role of essential amino acids and the mechanistic target of rapamycin complex 1 (mTORC1) pathway in the pathogenesis of child stunting

    USDA-ARS?s Scientific Manuscript database

    Stunting is the best summary measure of chronic malnutrition in children. Approximately one-quarter of children under age 5 worldwide are stunted. Lipid-based or micronutrient supplementation has little to no impact in reducing stunting, which suggests that other critical dietary nutrients are missi...

  8. Office for Civil Rights Annual Report to Congress, Fiscal Year 2005

    ERIC Educational Resources Information Center

    US Department of Education, 2006

    2006-01-01

    In this report, the Office for Civil Rights (OCR) provides a summary of its FY 2005 accomplishments. Also, in recognition of the 25th anniversary, some of the significant cases that OCR has resolved over the years are highlighted. The last quarter century was eventful and challenging for OCR. Major U.S. Supreme Court decisions, such as "Grove…

  9. Individualized Instruction for Data Access (IIDA). Quarterly Report No. 4.

    ERIC Educational Resources Information Center

    Drexel Univ., Philadelphia, PA. Graduate School of Library Science.

    A brief summary of the progress and status of the Individualized Instruction for Data Access (IIDA) project is followed by a report focusing on the principles and rules for analyzing a computer search performed using the IIDA software, and adaptation rules for the deferment of error messages in the case of frequent violations of the same rule. The…

  10. The Savannah River Site`s Groundwater Monitoring Program. Second quarter, 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-01-10

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1991 EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document.more » Analytical results from second quarter 1991 are listed in this report.« less

  11. The Savannah River Site's Groundwater Monitoring Program: Second quarter 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rogers, C.D.

    1992-10-07

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During second quarter 1992, EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of criteria to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Since 1991, the flagging criteria have been based on the federal Environmental Protection Agency (EPA) drinking water standards and on method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria sectionmore » of this document. Analytical results from second quarter 1992 are listed in this report.« less

  12. Special Inspector General for Iraq Reconstruction. Quarterly Report and Semiannual Report to the United States Congress

    DTIC Science & Technology

    2008-01-30

    Energy Fusion Cell, and allocations include $110 million for oil pipeline exclusion zones—which aim to prevent illegal tapping and sabotage of...sectors in Iraq. This quarter SIGIR highlights two of these programs: the electronic funds transfer ( EFT ) system and U.S. advisory support provided to...the Iraq Stock Exchange. eleCTroniC funds Transfer SIGIR noted last quarter that Iraq finally acti- vated an electronic funds transfer ( EFT ) system

  13. Special Inspector General for Iraq Reconstruction: Quarterly Report and Semiannual Report to the United States Congress

    DTIC Science & Technology

    2008-01-30

    Cell, and allocations include $110 million for oil pipeline exclusion zones—which aim to prevent illegal tapping and sabotage of pipelines—$51...This quarter SIGIR highlights two of these programs: the electronic funds transfer ( EFT ) system and U.S. advisory support provided to the Iraq Stock...Exchange. eleCTroniC funds Transfer SIGIR noted last quarter that Iraq finally acti- vated an electronic funds transfer ( EFT ) system. The United

  14. Hawaiian Volcano Observatory Seismic Data, January to December 2007

    USGS Publications Warehouse

    Nakata, Jennifer S.; Okubo, Paul G.

    2008-01-01

    The U.S. Geological Survey (USGS), Hawaiian Volcano Observatory (HVO) summary presents seismic data gathered during the year. The seismic summary is offered without interpretation as a source of preliminary data and is complete in that most data for events of M=1.5 are included. All latitude and longitude references in this report are stated in Old Hawaiian Datum. The HVO summaries have been published in various forms since 1956. Summaries prior to 1974 were issued quarterly, but cost, convenience of preparation and distribution, and the large quantities of data necessitated an annual publication, beginning with Summary 74 for the year 1974. Beginning in 2004, summaries are simply identified by the year, rather than by summary number. Summaries originally issued as administrative reports were republished in 2007 as Open-File Reports. All the summaries since 1956 are listed at http://geopubs.wr.usgs.gov/ (last accessed September 30, 2008). In January 1986, HVO adopted CUSP (California Institute of Technology USGS Seismic Processing). Summary 86 includes a description of the seismic instrumentation, calibration, and processing used in recent years. The present summary includes background information about the seismic network to provide the end user an understanding of the processing parameters and how the data were gathered. A report by Klein and Koyanagi (1980) tabulates instrumentation, calibration, and recording history of each seismic station in the network. It is designed as a reference for users of seismograms and phase data and includes and augments the information in the station table in this summary.

  15. 75 FR 72858 - Agency Information Collection Activities; Revision of a Currently-Approved Information Collection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ... Safety Assistance Programs (MCSAP).'' The information required consists of grant application preparation, quarterly reports and electronic data documenting the results of driver/vehicle inspections performed by the... Time per Response: Grant application preparation: 79.5 hours each; quarterly report preparation: 8...

  16. The Washington Academy of Biomedical Engineering (WABME) Quarterly Workshops: Clinical Problems and Engineering Solutions

    DTIC Science & Technology

    2005-01-01

    bioengineering programs and activities of The Catholic University of America, Georgetown University, The George Washington University and Howard ... University . A prime component of WABME activities is a quarterly series of research workshops, which bring together problem-rich biomedical disciplines and

  17. 75 FR 3926 - Submission for OMB Emergency Review: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    ... DEPARTMENT OF LABOR Bureau of Labor Statistics Submission for OMB Emergency Review: Comment.... Agency: Bureau of Labor Statistics. Type of Review: New collection. Title of Collection: Quarterly Census... appropriation tasks the Bureau of Labor Statistics (BLS) Quarterly Census of Employment and Wages (QCEW) program...

  18. 41 CFR 60-2.31 - Program summary.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Program summary. 60-2.31...-AFFIRMATIVE ACTION PROGRAMS Miscellaneous § 60-2.31 Program summary. The affirmative action program must be summarized and updated annually. The program summary must be prepared in a format which will be prescribed by...

  19. PV Working with Industry, 2nd Quarter, 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poole, L.; Moon, S.

    2000-06-29

    NREL PV Working With Industry is a quarterly newsletter devoted to the research, development, and deployment performed by NREL staff in concert with their industry and university partners. The Second Quarter, 2000, issue is titled ``Our Shared PV Future''. It contains a review of several important PV-related meetings held in the prior three months: the NCPV Program Review, the 16 European PV Conference, and year-2000 Earth Day activities in Denver, CO. The editorialist is Paul Maycock, Publisher of PV News.

  20. Department of Defense Companies Participating in the Department of Defense Subcontracting Program. First Three Quarters Fiscal Year 1990

    DTIC Science & Technology

    1990-01-01

    This report presents a variety of subcontract data collected from Department of Defense (DOD) large business firms that have received at least one...award in excess of $500,000 ($1,000,000 for construction). Public Law 95-507 requires that these contractors establish a small business and small...disadvantaged business subcontracting program and report to DOD quarterly, using Standard Form 295, on subcontract awards made to these types of firms

  1. Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report. October 1 - December 31, 2010.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2011-02-01

    Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of processed data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the currentmore » year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 x 2208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1987.20 hours (0.90 x 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 x 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continued through this quarter, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The second ARM Mobile Facility (AMF2) began deployment this quarter to Steamboat Springs, Colorado. The experiment officially began November 15, but most of the instruments were up and running by November 1. Therefore, the OPSMAX time for the AMF2 was 1390.80 hours (.95 x 1464 hours) for November and December (61 days). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or datastream. Data availability reported here refers to the average of the individual, continuous datastreams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. Summary. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period October 1-December 31, 2010, for the fixed sites. Because the AMFs operate episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. This first quarter comprises a total of 2,208 possible hours for the fixed sites and the AMF1 and 1,464 possible hours for the AMF2. The average of the fixed sites exceeded our goal this quarter. The AMF1 has essentially completed its mission and is shutting down to pack up for its next deployment to India. Although all the raw data from the operational instruments are in the Archive for the AMF2, only the processed data are tabulated. Approximately half of the AMF2 instruments have data that was fully processed, resulting in the 46% of all possible data made available to users through the Archive for this first quarter. Typically, raw data is not made available to users unless specifically requested.« less

  2. Companies Participating in the Department of Defense Subcontracting Program. First Quarter, Fiscal Year 1995.

    DTIC Science & Technology

    1995-01-01

    disadvantaged businesses. Approximately 1,000 companies report these data each quarter during a fiscal year. The report has a section for each of the...subcontracting surveillance review, net value of subcontract awards, and the amount and percent of awards to small and disadvantaged businesses. The

  3. A Quarter Century of TV Food Advertising Targeted at Children.

    ERIC Educational Resources Information Center

    Gamble, Margaret; Cotugna, Nancy

    1999-01-01

    Analyzed current trends in television advertising targeting children, comparing results to the historical perspective of the last quarter century. Researchers evaluated 16 hours of Saturday morning children's programming on four network channels for commercial content based on Food Guide Pyramid and USDA Child Nutrition criteria. Overall,…

  4. 10 CFR 420.5 - Reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Reports. 420.5 Section 420.5 Energy DEPARTMENT OF ENERGY... § 420.5 Reports. (a) Each State receiving financial assistance under this part shall submit to the cognizant Regional Office Director a quarterly program performance report and a quarterly financial status...

  5. 75 FR 39619 - Proposed Information Collection (Quarterly Report of State Approving Agency) Activities Activity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ... information needed to accurately reimburse State Approving Agencies (SAAs) for expenses incurred in the... reimburses SAAs for expenses incurred in the approval and supervision of education and training programs. SAAs are required to report their activities to VA quarterly and provide notices regarding which...

  6. 40 CFR 85.1904 - Voluntary emissions recall report; quarterly reports.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 19 2012-07-01 2012-07-01 false Voluntary emissions recall report; quarterly reports. 85.1904 Section 85.1904 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Emission Defect Reporting Requirements § 85.1904 Voluntary emissions...

  7. 40 CFR 85.1904 - Voluntary emissions recall report; quarterly reports.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Voluntary emissions recall report; quarterly reports. 85.1904 Section 85.1904 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Emission Defect Reporting Requirements § 85.1904 Voluntary emissions...

  8. 40 CFR 85.1904 - Voluntary emissions recall report; quarterly reports.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 18 2011-07-01 2011-07-01 false Voluntary emissions recall report; quarterly reports. 85.1904 Section 85.1904 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Emission Defect Reporting Requirements § 85.1904 Voluntary emissions...

  9. 40 CFR 85.1904 - Voluntary emissions recall report; quarterly reports.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 19 2013-07-01 2013-07-01 false Voluntary emissions recall report; quarterly reports. 85.1904 Section 85.1904 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Emission Defect Reporting Requirements § 85.1904 Voluntary emissions...

  10. Seasons: The National Native American AIDS Prevention Center Quarterly. Summer 1990-Autumn 1992.

    ERIC Educational Resources Information Center

    Rush, Andrea Green, Ed.

    1992-01-01

    Nine issues of this quarterly periodical examine AIDS prevention, education, and health care services for Native Americans and their communities. Major articles include personal narratives, interviews, roundtable discussions, program descriptions, guidelines for physicians and educators, and overviews of available services, and cover the following…

  11. 42 CFR 408.8 - Grace period and termination date.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MEDICARE PROGRAM PREMIUMS FOR SUPPLEMENTARY MEDICAL INSURANCE General Provisions § 408.8 Grace period and termination date. (a) Grace period. (1) For all initial premium payments (monthly or quarterly), and subsequent monthly or quarterly payments, the grace period ends with the last day of the third month after...

  12. The Savannah River Site's Groundwater Monitoring Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-01-01

    The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria sectionmore » of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.« less

  13. The Work of the Registrar: A Summary of Principles and Practices in American Universities and Colleges

    ERIC Educational Resources Information Center

    Preinkert, Alma H.

    2005-01-01

    Take a walk down Memory Lane... In 1940 when AACRAO's new release "The Work of the Registrar" was written: Yale tuition was fifty dollars per quarter; colleges had curfews for women and dress codes; the average salary was $1,299 annually; first class stamps were three cents; and colleges sent progress reports home to parents. Read about what has…

  14. Solid State Research, 1980:1.

    DTIC Science & Technology

    1980-02-15

    ESD-TR-79-325 H 1 Solid State Research 1980 Prepared under Electronic Systems Division Contract FI%28-80-C-0002 by Lincoln Laboratory MASSkCHIISETTS...it is no longer needed. MASSACHUSETTS IN*STITUTE OF TECHNOLOGY LINCOLN LABORATORY V SOLID STATE RESEARCH QUARTERLY TECHNICAL SUMMARY REPORT I NOVEMBER...January 1990. The topics covered a-e Solid State Device Research , Quantum Electronics, Materials Rese.rch, Microelec- tronics, and Analog Device

  15. Prevalence of subclinical mastitis and associated risk factors at cow and herd level in dairy farms in North-West Ethiopia.

    PubMed

    Mekonnen, S A; Koop, G; Melkie, S T; Getahun, C D; Hogeveen, H; Lam, T J G M

    2017-09-15

    Knowledge of mastitis pathogens and their predominance as well as understanding of risk factors are prerequisites to improve udder health in a herd, region or country. In Ethiopia, such information is scarce, despite the fact that mastitis is an important cattle disease in the country. A cross-sectional study that describes prevalence and causative agents of subclinical mastitis (SCM) as well as risk factors at cow and herd level was conducted on 167 dairy farms in North-West Ethiopia. On average, 33% of the quarters and 62% of the cows were California Mastitis Test (CMT) positive, but the within herd quarter level prevalence ranged between 0 and 100%. A total of 1543 milk samples, being 27 quarters that showed signs of CM, 606 CMT positive quarters and 910 CMT negative quarters were cultured, respectively 40%, 67% and 47% was positive on bacteriological culture. Coagulase negative staphylococci (CNS) (31%) followed by Staphylococcus aureus (9%) were the pathogens most frequently isolated. Based on face-to-face questionnaire data, 35 herd level and 13 cow level factors were evaluated for their association with SCM (based on CMT) and with a positive culture for any bacteria, CNS or S. aureus. Cows with a history of CM, of higher parity, >150days in milk (DIM) and herds with owners that have >10th grade level of education had higher odds of SCM. The odds of being culture positive for any bacteria was higher in cows with ≥25% Holstein Friesian blood level (HBL), >150 DIM, housed on cemented floors, and milked by squeezing rather than stripping. Similarly, the odds of culturing CNS was higher in cows with 25-50% HBL, >150 DIM, and milked by squeezing. Staphylococcus aureus was more often found in cows with a history of CM and in larger herds. Checking the udder for mastitis, feeding cows according to their requirements and allowing calves to suckle the cows were negatively associated with SCM, with culturing any bacteria and with culturing CNS, respectively. Higher odds of SCM and of culturing CNS were found in herds owned by members of a dairy cooperative. In summary, we identified a high prevalence of SCM and intramammary infections with substantial variation between farms, and we found a number of risk factors explaining this variation. The risk factors for mastitis that were identified in this study can form the basis of an udder health control program specific for the dairy industry in North-West Ethiopia. Copyright © 2017 Elsevier B.V. All rights reserved.

  16. Status of ground-water resources at U.S. Navy Support Facility, Diego Garcia; summary of hydrologic and climatic data, January 1994 through September 1996

    USGS Publications Warehouse

    Torikai, J.D.

    1996-01-01

    This report describes the status of ground-water resources at U.S. Navy Support Facility, Diego Garcia. Data presented are from January 1994 through September 1996, with a focus on data from July through September 1996 (third quarter of 1996). A complete database of ground-water withdrawals and chloride-concentration records since 1985 is maintained by the U.S. Geological Survey. Total rainfall for the period July through September 1996 was 8.94 inches, which is 60 percent less than the mean rainfall of 22.23 inches for the period July through September. July and August are part of the annual dry season, while September is the start of the annual wet season. Ground-water withdrawal during July through September 1996 averaged 1,038,300 gallons per day. Withdrawal for the same 3 months in 1995 averaged 888,500 gallons per day. Ground-water withdrawals have steadily increased since about April 1995. At the end of September 1996, the chloride concentration of water from the elevated tanks at Cantonment and Air Operations were 68 and 150 milligrams per liter, respectively. The chloride concentration from all five production areas increased throughout the third quarter of 1996, and started the upward trend in about April 1995. Chloride concentration of ground water in monitoring wells at Cantonment and Air Operations also increased throughout the third quarter of 1996, with the largest increases from water in the deepest monitoring wells. Chloride concentrations have not been at this level since the dry season of 1994. A fuel-pipeline leak at Air Operations in May 1991 decreased total islandwide withdrawals by 15 percent. This lost pumping capacity is being offset by increased pumpage at Cantonment. Six wells do not contribute to the water supply because they are being used to hydraulically divert fuel migration away from water-supply wells by a program of ground-water withdrawal and injection.

  17. Semi-annual report of the Department of Energy, Deputy Assistant Secretary for Environment, Quality Assessment Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sanderson, C.G.; Scarpitta, S.C.

    1991-07-01

    This report presents the results from the analysis of the 34th set of environmental quality assessment samples (QAP 34) that were received on or before June 10, 1991. This Quality Assessment Program (QAP) is designed to test the quality of the environmental measurements being reported to the Department of Energy by its contractors. Since 1976, real or synthetic environmental samples that have been prepared and thoroughly analyzed at the Environmental Measurements Laboratory (EML) have been distributed at first quarterly and then semi-annually to these contractors. Their results, which are returned to EML within 90 days, are compiled with EML's resultsmore » and are reported back to the participating contractors 30 days later. A summary of the reported results is available to the participants 3 days after the reporting deadline via a modem-telephone connection to the EML computer. The EML value'' listed in the tables to which the contractors' results are compared is the mean of replicate determination for each nuclide. The EML uncertainty is the standard error of the mean. All other uncertainties are as reported by the participants.« less

  18. National NIF Diagnostic Program Fiscal Year 2002 Second Quarter Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacGowan, B

    Since October 2001 the development of the facility diagnostics for NIF has been funded by the NIF Director through the National NIF Diagnostic Program (NNDP). The current emphasis of the NNDP is on diagnostics for the early NIF quad scheduled to be available for experiment commissioning in FY03. During the past six months the NNDP has set in place processes for funding diagnostics, developing requirements for diagnostics, design reviews and monthly status reporting. Those processes are described in an interim management plan for diagnostics (''National NIF Diagnostic Program Interim Plan'', NIF-0081315, April 2002) and a draft Program Execution Plan (''Programmore » Execution Plan for the National NlF Diagnostic Program'', NIF-0072083, October 2001) and documents cited therein. Work has been funded at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Naval Research Laboratory (NRL), Sandia National Laboratories (SNL), Bechtel Nevada at Los Alamos and Santa Barbara. There are no major technical risks with the early diagnostics. The main concerns relate to integration of the diagnostics into the facility, all such issues are being worked. This report is organized to show the schedule and budget status and a summary of Change Control Board actions for the past six months. The following sections then provide short descriptions of the status of each diagnostic. Where design reviews or requirements documents are cited, the documents are available on the Diagnostics file server or on request.« less

  19. Retaining minorities in engineering: Assessment of a program prototype

    NASA Astrophysics Data System (ADS)

    Good, Jennifer Marie (Phillips)

    Program assessment is an essential part of healthy program development. Assessment should include multiple considerations, dimensions, and outcomes that match the program's objectives. As a newly formed retention program, the Auburn University Minority Engineering Program, designed to help pre-engineering minority students make the transition into their freshman year of university studies, incorporated evaluation and assessment into all three components of the program (the interactive learning laboratory, critical-thinking workshops, and Sunday-evening tutorials) from the program's inception. If students successfully adapted to the university environment and the demands of the pre-engineering course of study, then retention of minority students in the College of Engineering should improve. Data were gathered on the students involved in the various program components. Students who entered the Minority Engineering Program were pre- and posttested on three standardized subtests (critical thinking, mathematics, and science reasoning) of the Collegiate Assessment of Academic Proficiency. The first-quarter grade-point averages of the students were also gathered to compare their grades to freshman students in previous quarters within the College of Engineering. Qualitative data were also gathered on this same group of students. An analysis of the data revealed that student achievement is affected by involvement in the Minority Engineering Program. Specifically, the first quarter grade point averages of students involved in the program exceeded those of their peers in earlier years of study prior to the program's existence. In addition, mathematics and science reasoning scores on standardized tests increased pre- to postintervention. Comments collected in journals and files also demonstrated use of critical-thinking and problem-solving skills employed by the students. Recommendations for alterations of the program were made based on the outcome of the program evaluation. Further suggestions for research in minority engineering program development and evaluation were also discussed.

  20. Quarter Scale RLV Multi-Lobe LH2 Tank Test Program

    NASA Technical Reports Server (NTRS)

    Blum, Celia; Puissegur, Dennis; Tidwell, Zeb; Webber, Carol

    1998-01-01

    Thirty cryogenic pressure cycles have been completed on the Lockheed Martin Michoud Space Systems quarter scale RLV composite multi-lobe liquid hydrogen propellant tank assembly, completing the initial phases of testing and demonstrating technologies key to the success of large scale composite cryogenic tankage for X33, RLV, and other future launch vehicles.

  1. Illinois Association for Counseling and Development (IACD) Quarterly, 1990.

    ERIC Educational Resources Information Center

    Illovsky, Michael E., Ed.

    1990-01-01

    This document consists of the four issues of the "IACD Quarterly" published in 1990. Articles in this volume include: (1) "A Comprehensive Program for Reducing School Anxieties in College Students" (David Ross); (2) "Issues in Child Custody Determination in Illinois" (Amy Jo Buwick); (3) "Finding Meaning in the Here and Now Through Gestalt Therapy…

  2. Drinking by University Dormitory Residents: Its Prediction and Amelioration.

    ERIC Educational Resources Information Center

    Schall, Mathew; And Others

    1991-01-01

    College students (n=200) in 2 university dormitories completed alcohol and drug use survey in fall quarter and 130 students were readministered questionnaire at end of spring quarter after peer-directed alcohol awareness program was implemented in a particular dormitory. Retest results showed no difference in drinking behavior of residents in…

  3. Department of Defense Companies Participating in the Department of Defense Subcontracting Program, First Quarter Fiscal Year 1994

    DTIC Science & Technology

    1994-01-01

    disadvantaged businesses. Approximately 1,000 companies report these data each quarter during a fiscal year. The report has section for each of the Military...subcontracting surveillance review, net value of subcontract awards, and the amount and percent of awards to small and small disadvantaged businesses. The

  4. Straight Talk on Student Loans. PPI Policy Brief

    ERIC Educational Resources Information Center

    Shireman, Robert

    2004-01-01

    The federal government provides student loans for college and graduate school in two ways: by: (1) guaranteeing bank loans; and (2) by lending directly to students. Approximately three-quarters of federal student loans are guaranteed and one-quarter are direct. In the guaranteed loan program, a 40-year-old system, banks lend students money and…

  5. 45 CFR 286.265 - When are quarterly reports due?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... shall begin collecting financial data for the TANF Financial Report as of the initial effective date of its TANF program. (b) Each Tribe must submit its TANF Data Report and TANF Financial Report within 45... 45 Public Welfare 2 2010-10-01 2010-10-01 false When are quarterly reports due? 286.265 Section...

  6. Pittsburgh Technical Health Training Institute Demonstration Project; Quarterly Report.

    ERIC Educational Resources Information Center

    Kishkunas, Louis J.

    This fifth quarterly report covers the period June 15, 1967 to December 15, 1967 of a project aimed at demonstrating a faster method of training higly qualified workers for the health field. During this period, nurse aides were trained in a pilot program based upon the educational objectives derived from entry level behavioral specifications…

  7. PFBC HGCU Test Facility. Technical progress report No. 24, Third quarter, CY 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This is the twenty-fourth and final Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. This report covers the work completed during the Third Quarter of CY 1995. All activity this quarter was directed toward the completion of the program final report. A draft copy of the final report was forwarded to DOE during this quarter, and DOE submitted their comments on the report to AEPSC. DOE requested that Westinghouse write an appendix to the reportmore » covering the performance of the fail-safe regenerator devices during Tad operation, and Westinghouse subsequently prepared the appendix. Additional DOE comments were incorporated into the report, and it will be issued in camera-ready form by the end of October, 1995, which is the program end date. Appendix 1 presents the results of filter candle posttest examination by Westinghouse performed on selected filter candles following final shutdown of the system.« less

  8. [Development of cell content and shedding of Prototheca spp. in milk from infected udder quarters of cows].

    PubMed

    Tenhagen, B A; Hille, A; Schmidt, A; Heuwieser, W

    2005-02-01

    It was the objective of this study to analyse shedding patterns and somatic cell counts in cows and quarters infected with Prototheca spp. and to evaluate two approaches to identify infected animals by somatic cell count (SCC) or by bacteriological analysis of pooled milk samples. Five lactating dairy cows, chronically infected with Prototheca spp. in at least one quarter were studied over 11 weeks to 13 months. Quarter milk samples and a pooled milk sample from 4 quarters were collected aseptically from all quarters of the cows on a weekly basis. Culture results of quarter milk and pooled samples were compared using cross tabulation. SCC of quarter milk samples and of pooled samples were related to the probability of detection in the infected quarters and cows, respectively. Shedding of Prototheca spp. was continuous in 2 of 8 quarters. In the other quarters negative samples were obtained sporadically or over a longer period (1 quarter). Overall, Prototheca spp. were isolated from 83.6% of quarter milk samples and 77.0% of pooled milk samples of infected quarters and cows. Somatic cell counts were higher in those samples from infected quarters that contained the algae than in negative samples (p < 0.0001). The same applied for composite samples from infected cows. Positive samples had higher SCC than negative samples. However, Prototheca spp. were also isolated from quarter milk and pooled samples with physiological SCC (i.e. < 10(5)/ml). Infected quarters that were dried off did not develop acute mastitis. However, drying off had no effect on the infection, i.e. samples collected at calving or 8 weeks after dry off still contained Prototheca spp. Results indicate that pre-selection of cows to be sampled for Prototheca spp. by SCC and the use of composite samples are probably inadequate in attempts to eradicate the disease. However, due to intermittent shedding of the algae in some cows, single herd sampling using quarter milk samples probably also fails to detect all infected cases. Therefore, continuous monitoring of problem cows with clinical mastitis or increased SCC in herds during eradication programs is recommended.

  9. QUARTERLY TECHNICAL PROGRESS REPORT, JULY, AUGUST, SEPTEMBER 1967.

    DTIC Science & Technology

    Contents: Circuit research program; Hardware systems research; Computer system software research; Illinois pattern recognition computer: ILLIAC II... service , use, and program development; IBM 7094/1401 service , use, and program development; Problem specifications; General laboratory information.

  10. BIOMASS REBURNING - MODELING/ENGINEERING STUDIES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vladimir Zamansky; Chris Lindsey

    This project is designed to develop engineering and modeling tools for a family of NO{sub x}control technologies utilizing biomass as a reburning fuel. During the eighth reporting period (July 1--September 26, 1999), Antares Group Inc, under contract to Niagara Mohawk Power Corporation, evaluated the economic feasibility of biomass reburning options for Dunkirk Station. This report includes summary of the findings; complete information will be submitted in the next Quarterly Report.

  11. Project SQUID. Quarterly Progress Report

    DTIC Science & Technology

    1948-10-01

    cata- lysts imbedded in the liner walls, and endothermic diffusion processes. Summary The paper entitled Heat Transfer in Laminar Boundary Layer...in mixture strength must be effected up to that required for maximum heat release to prevent blow -off of the annu- lus flame. It is possible to...these films. An X-ray diffraction investigation of the effect of polishing agent on the character of oxidation product has been started. Samples

  12. Establishing the SECME model in the District of Columbia. Quarterly report, 1 January 1994--31 March 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vikers, R.G.

    1994-05-01

    During this quarter, many program activities were held to help SECME teachers and counselors implement, improve and strengthen SECME school programs in the District of Columbia. Teachers were actively engaged in enhanced instructional techniques, ideas, processes and resources to help them enrich their students` learning experience. Students are busily participating in hands-on instructional activities and preparing for the SECME competition where they are learning to excel in a competitive environment designed to help them make the most of their school experience.

  13. Atmospheric Radiation Measurement program climate research facility operations quarterly report October 1 - December 31, 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2008-01-24

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period October 1 - December 31, 2007, for the fixed sites and the mobile site. The AMF has been deployed to Germany and this was the final operational quarter. The first quarter comprises a total of 2,208 hours. Although the average exceeded our goal this quarter, a series of severe weather events (i.e., widespread ice storms) disrupted utility services, which affected the SGP performance measures. Some instruments were covered in ice and power and data communication lines were down for more than 10 days in some areas of Oklahoma and Kansas, which resulted in lost data at the SGP site. The Site Access Request System is a web-based database used to track visitors to the fixed sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. The AMF completed its mission at the end of this quarter in Haselback, Germany (FKB designation). NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in 2006. PYE represents just the AMF Archive statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request an account on the local site data system. The eight research computers are located at the Barrow and Atqasuk sites; the SGP central facility; the TWP Manus, Nauru, and Darwin sites; the DMF at PNNL; and the AMF, currently in Germany. In addition, the ACRF serves as a data repository for a long-term Arctic atmospheric observatory in Eureka, Canada (80 degrees 05 minutes N, 86 degrees 43 minutes W) as part of the multiagency Study of Environmental Arctic Change (SEARCH) Program. NOAA began providing instruments for the site in 2005, and currently cloud radar data are available. The intent of the site is to monitor the important components of the Arctic atmosphere, including clouds, aerosols, atmospheric radiation, and local-scale atmospheric dynamics. Due to the similarity of ACRF NSA data streams, and the important synergy that can be formed between a network of Arctic atmospheric observations, much of the SEARCH observatory data are archived in the ARM archive. Instruments will be added to the site over time. For more information, please visit http://www.db.arm.gov/data. The designation for the archived Eureka data is YEU and is now included in the ACRF user metrics. This quarterly report provides the cumulative numbers of visitors and user accounts by site for the period January 1, 2007 - December 31, 2007. Table 2 shows the summary of cumulative users for the period January 1, 2007 - December 31, 2007. For the first quarter of FY 2008, the overall number of users was up significantly from the last reporting period. For the fourth consecutive reporting period, a record high number of Archive users was recorded. In addition, the number of visitors and visitor days set a new record this reporting period particularly due to the large number of field campaign activities in conjunction with the AMF deployment in Germany. It is interesting to note this quarter that 22% (a slight decrease from last quarter) of the Archive users are ARM Science funded principal investigators and 35% (the same as last quarter) of all other facility users are either ARM Science-funded principal investigators or ACRF infrastructure personnel. For reporting purposes, the three ACRF sites and the AMF operate 24 hours per day, 7 days per week, and 52 weeks per year. Time is reported in days instead of hours. If any lost work time is incurred by any employee, it is counted as a workday loss. Table 3 reports the consecutive days since the last recordable or reportable injury or incident causing damage to property, equipment, or vehicle for the period October 1 - December 31, 2007. There were no incidents this reporting period.« less

  14. The Climate Science Special Report (CSSR) of the Fourth National Climate Assessment (NCA4)

    NASA Astrophysics Data System (ADS)

    Wuebbles, D. J.; Fahey, D. W.; Hibbard, K. A.

    2016-12-01

    The Climate Science Special Report (CSSR) will provide key input into the Fourth National Climate Assessment (NCA4). The report was initiated in 2016 under the guidance of the U.S. Global Change Research Program (USGCRP) as a new, stand-alone report of the state-of-science relating to climate change and its physical impacts. The report is undergoing peer and public review in late 2016 with the aim for final publication in the fourth quarter of 2017. CSSR will provide a comprehensive assessment of the science underlying the changes occurring in the Earth's climate system, with a special focus on the United States. CSSR will serve several purposes for NCA4, including 1) providing an updated detailed analysis of the findings of how climate change is affecting weather and climate across the United States, 2) providing an executive summary that will be used as the basis for the climate science discussion in NCA4, and 3) providing foundational information and projections for climate change, including extremes, to improve "end-to-end" consistency in sectoral, regional, and resilience analyses for NCA4. We will present a summary of the origins and development of CSSR, the writing team, the chapter topics and the relation of CSSR content to NCA4, other assessments and relevance to policy and research communities.

  15. QUARTERLY TECHNICAL PROGRESS REPORT, JULY, AUGUST, SEPTEMBER 1966.

    DTIC Science & Technology

    Contents: Circuit research program; Hardware systems research; Software systems research program; Numerical methods, computer arithmetic and...artificial languages; Library automation; Illiac II service , use, and program development; IBM service , use, and program development; Problem specifications; Switching theory and logical design; General laboratory information.

  16. 34 CFR 668.9 - Relationship between clock hours and semester, trimester, or quarter hours in calculating Title...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Relationship between clock hours and semester, trimester, or quarter hours in calculating Title IV, HEA program assistance. 668.9 Section 668.9 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION...

  17. 78 FR 46905 - Tobacco Transition Program; Final Assessment Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ... adjusted market share for the 39th and 40th quarterly assessment payments due on September 30, 2014, will be based on the assessed entity's market activity during April 1 to June 30, 2014. The 40th quarterly assessment will be initially determined by using the same adjusted market share of an entity that was used to...

  18. 34 CFR 690.63 - Calculation of a Federal Pell Grant for a payment period.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... fall through the following spring, or three quarters in the fall, winter, and spring, none of which... program using an academic calendar that includes two semesters or trimesters in the fall through the following spring, or three quarters in the fall, winter, and spring; and (B) Does not provide at least 30...

  19. 45 CFR 265.4 - When are quarterly reports due?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 2 2013-10-01 2012-10-01 true When are quarterly reports due? 265.4 Section 265.4 Public Welfare Regulations Relating to Public Welfare OFFICE OF FAMILY ASSISTANCE (ASSISTANCE PROGRAMS), ADMINISTRATION FOR CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN SERVICES DATA COLLECTION AND REPORTING REQUIREMENTS § 265.4 When are...

  20. The U.S. Evolved Expendable Launch Vehicle (EELV) programs : Quarterly Launch Report : special report

    DOT National Transportation Integrated Search

    1997-01-01

    The Evolved Expendable Launch Vehicle (EELV) Program is a Department of Defense technology-development program managed by the Air Force. The program is intended to produce an improved launch vehicle family for government use. The EELV will replace th...

  1. 78 FR 25787 - Community Connect Broadband Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Learning and Telemedicine Grant Program) during its quarterly Tribal Consultation webinar and... accommodate distance learning, telework, e-government and telemedicine, rural America will see improving... through and beyond completion. 3. Scoring Simplification. The current program scores and ranks...

  2. Hawaiian Volcano Observatory Seismic Data, January to December 2008

    USGS Publications Warehouse

    Nakata, Jennifer S.; Okubo, Paul G.

    2009-01-01

    The U.S. Geological Survey (USGS), Hawaiian Volcano Observatory (HVO) summary presents seismic data gathered during the year. The seismic summary is offered without interpretation as a source of preliminary data and is complete in that most data for events of M greater than 1.5 are included. All latitude and longitude references in this report are stated in Old Hawaiian Datum. The HVO summaries have been published in various forms since 1956. Summaries prior to 1974 were issued quarterly, but cost, convenience of preparation and distribution, and the large quantities of data necessitated an annual publication, beginning with Summary 74 for the year 1974. Beginning in 2004, summaries are simply identified by the year, rather than by summary number. Summaries originally issued as administrative reports were republished in 2007 as Open-File Reports. All the summaries since 1956 are listed at http://geopubs.wr.usgs.gov/ (last accessed 09/21/2009). In January 1986, HVO adopted CUSP (California Institute of Technology USGS Seismic Processing). Summary 86 includes a description of the seismic instrumentation, calibration, and processing used in recent years. The present summary includes background information about the seismic network to provide the end user an understanding of the processing parameters and how the data were gathered. A report by Klein and Koyanagi (1980) tabulates instrumentation, calibration, and recording history of each seismic station in the network. It is designed as a reference for users of seismograms and phase data and includes and augments the information in the station table in this summary. Figures 11-14 are maps showing computer-located hypocenters. The maps were generated using the Generic Mapping Tools (GMT http://gmt.soest.hawaii.edu/, last accessed 09/21/2009) in place of traditional Qplot maps.

  3. Manager Development: A Conceptual Model

    DTIC Science & Technology

    1976-05-31

    Leader Behavior: A Summary. (Technical Report No. 40 on ONR Contract). Rochester, New York, 1972. Vroom , V . H . & E. L. Deci. "The stability of...36-49. Vroom , V . H . & K. R. MacCrimmon "Toward a stochastic model of managerial careers", Administrative Science Quarterly, June, 1968, 26-46. 6...34 ( Vroom and MacCrimmon, 1968). Expanded by White (1970), this approach deems careers not as the result of individual characteristics and motives , but as

  4. Clinical care management and workflow by episodes.

    PubMed Central

    Claus, P. L.; Carpenter, P. C.; Chute, C. G.; Mohr, D. N.; Gibbons, P. S.

    1997-01-01

    This paper describes the implementation of clinically defined episodes of care and the introduction of an episode-based summary list of patient problems across Mayo Clinic Rochester in 1996 and 1997. Although Mayo's traditional paper-based system has always relied on a type of 'episode of care' (called the "registration") for patient and history management, a new, more clinically relevant definition of episode of care was put into practice in November 1996. This was done to improve care management and operational processes and to provide a basic construct for the electronic medical record. Also since November 1996, a computer-generated summary list of patient problems, the "Master Sheet Summary Report," organized by episode, has been placed in all patient histories. In the third quarter of 1997, the ability to view the episode-based problem summary online was made available to the 3000+ EMR-capable workstations deployed across the Mayo Rochester campus. In addition, the clinically oriented problem summarization process produces an improved basic "package" of clinical information expected to lead to improved analytic decision support, outcomes analysis and epidemiological research. PMID:9357595

  5. A hospital discharge summary quality improvement program featuring individual and team-based feedback and academic detailing.

    PubMed

    Axon, Robert N; Penney, Fletcher T; Kyle, Thomas R; Zapka, Jane; Marsden, Justin; Zhao, Yumin; Mauldin, Patrick D; Moran, William P

    2014-06-01

    Discharge summaries are an important component of hospital care transitions typically completed by interns in teaching hospitals. However, these documents are often not completed in a timely fashion or do not include pertinent details of hospitalization. This report outlines the development and impact of a curriculum intervention to improve the quality of discharge summaries by interns and residents in Internal Medicine. A previous study demonstrated that a discharge summary curriculum featuring individualized feedback was associated with improved summary quality, but few subsequent studies have described implementation of similar curricula. No information exists on the utility of other strategies such as team-based feedback or academic detailing. Study participants were 96 Internal Medicine intern and resident physicians at an academic medical center-based training program. A comprehensive evidence-based discharge summary quality improvement program was developed and implemented that featured a discharge summary template to facilitate summary preparation, individual feedback, team-based feedback, academic detailing and an objective discharge summary evaluation instrument. The discharge summary evaluation instrument had moderate interrater reliability (κ = 0.72). Discharge summary scores improved from mean score of 70% to 82% (P = 0.05). Interns and residents participating in this program also reported increased confidence in producing and critiquing summaries. A comprehensive discharge summary curriculum can be feasibly implemented within the context of a residency program. Team-based feedback and academic detailing may serve to reinforce individual feedback and extend program reach.

  6. Atmospheric Radiation Measurement program climate research facility operations quarterly report January 1 - March 31, 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2008-05-22

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period January 1 - March 31, 2008, for the fixed sites. The AMF is being deployed to China and is not in operation this quarter. The second quarter comprises a total of 2,184 hours. The average as well as the individual site values exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. FKB represents the AMF statistics for the Haselbach, Germany, past deployment in 2007. NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in 2006. PYE represents just the AMF Archive statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request a research account on the local site data system. The seven computers for the research accounts are located at the Barrow and Atqasuk sites; the SGP central facility; the TWP Manus, Nauru, and Darwin sites; and the DMF at PNNL. In addition, the ACRF serves as a data repository for a long-term Arctic atmospheric observatory in Eureka, Canada (80 degrees 05 minutes N, 86 degrees 43 minutes W) as part of the multiagency Study of Environmental Arctic Change (SEARCH) Program. NOAA began providing instruments for the site in 2005, and currently cloud radar data are available. The intent of the site is to monitor the important components of the Arctic atmosphere, including clouds, aerosols, atmospheric radiation, and local-scale atmospheric dynamics. Because of the similarity of ACRF NSA data streams and the important synergy that can be formed between a network of Arctic atmospheric observations, much of the SEARCH observatory data are archived in the ARM archive. Instruments will be added to the site over time. For more information, please visit http://www.db.arm.gov/data. The designation for the archived Eureka data is YEU and is now included in the ACRF user metrics. This quarterly report provides the cumulative numbers of visitors and user accounts by site for the period April 1, 2007 - March 31, 2008. Table 2 shows the summary of cumulative users for the period April 1, 2007 - March 31, 2007. For the second quarter of FY 2008, the overall number of users was nearly as high as the last reporting period, in which a new record high for number of users was established. This quarter, a new record high was established for the number of user days, particularly due to the large number of field campaign activities in conjunction with the AMF deployment in Germany, as well as major field campaigns at the NSA and SGP sites. This quarter, 37% of the Archive users are ARM science-funded principal investigators and 23% of all other facility users are either ARM science-funded principal investigators or ACRF infrastructure personnel. For reporting purposes, the three ACRF sites and the AMF operate 24 hours per day, 7 days per week, and 52 weeks per year. Time is reported in days instead of hours. If any lost work time is incurred by any employee, it is counted as a workday loss. Table 3 reports the consecutive days since the last recordable or reportable injury or incident causing damage to property, equipment, or vehicle for the period January 1 - March 31, 2008. There were no incidents this reporting period.« less

  7. 78 FR 69493 - Self-Regulatory Organizations; NYSE Arca, Inc.; Notice of Filing and Immediate Effectiveness of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-19

    ... additions are made. The total number of Quarterly Options Series that can be listed at any one time is.... To help ensure that only active options series are listed, Exchange procedures are designed to delist... Change Amending Commentary .08 to Rule 6.4 To Modify the Quarterly Option Series Program To Eliminate the...

  8. Q4 2016/Q1 2017 Solar Industry Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Margolis, Robert; Feldman, David; Boff, Daniel

    2017-05-17

    This technical presentation provides an update on the major trends that occurred in the solar industry in the fourth quarter of 2016 and the first quarter of 2017. Major topics of focus include global and U.S. supply and demand, module and system price, investment trends and business models, and updates on U.S. government programs supporting the solar industry.

  9. The Structure and Dynamics of the Solar Corona and Inner Heliosphere-First Quarter First Year Progress Report

    NASA Technical Reports Server (NTRS)

    Mikic, Zoran; Grebowsky, J. (Technical Monitor)

    2000-01-01

    This report details progress during the first quarter of the first year of our Sun-Earth Connections Theory Program (SECTP) contract. Science Applications International Corporation (SAIC) and the University of California, Irvine (UCI) have conducted research into theoretical modeling of active regions, the solar corona, and the inner heliosphere, using the MHD model.

  10. 45 CFR 265.3 - What reports must the State file on a quarterly basis?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 2 2013-10-01 2012-10-01 true What reports must the State file on a quarterly basis? 265.3 Section 265.3 Public Welfare Regulations Relating to Public Welfare OFFICE OF FAMILY ASSISTANCE (ASSISTANCE PROGRAMS), ADMINISTRATION FOR CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN SERVICES DATA COLLECTION AND REPORTING...

  11. H-Area Seepage Basins groundwater monitoring report. Fourth quarter 1992 and 1992 summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-01

    During fourth quarter 1992, the groundwater at the H-Area Seepage Basins (HASB) was monitored in compliance with South Carolina Hazardous Waste Management Regulations, R61-79.265, Subpart F. Samples were collected from 130 wells that monitor the three separate hydrostratigraphic units that make up the uppermost aquifer beneath the HASB. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B Post-Closure Care Permit Application for the H-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control in December 1990. Historically, as well as currently, tritium, nitrate, total alpha-emittingmore » radium, gross alpha, and mercury have been the primary constituents observed above final Primary Drinking Water Standards (PDWS) in groundwater at the HASB. Isoconcentration/isoactivity maps included in this report indicate both the concentration/activity and extent of the primary contaminants in each of the three hydrostratigraphic units during first and fourth quarter 1992. Water-level maps indicate that the groundwater flow rates and directions at the HASB have remained relatively constant since the basins ceased to be active in 1988.« less

  12. Increase in Naloxone Prescriptions Dispensed in US Retail Pharmacies Since 2013.

    PubMed

    Jones, Christopher M; Lurie, Peter G; Compton, Wilson M

    2016-04-01

    Distribution of naloxone, traditionally through community-based naloxone programs, is a component of a comprehensive strategy to address the epidemic of prescription opioid and heroin overdose deaths in the United States. Recently, there has been increased focus on naloxone prescription in the outpatient setting, particularly through retail pharmacies, yet data on this practice are sparse. We found an 1170% increase in naloxone dispensing from US retail pharmacies between the fourth quarter of 2013 and the second quarter of 2015. These findings suggest that prescribing naloxone in the outpatient setting complements traditional community-based naloxone programs.

  13. The Savannah River Site's Groundwater Monitoring Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted during the first quarter of 1992. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official document of the analytical results.

  14. 78 FR 11189 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-October Through December 2012

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... beneficiaries, health care providers, and the public; and (2) maintaining effective communications with CMS... Cantwell, Director, Office of Strategic Operations and Regulatory Affairs. [[Page 11191

  15. The AMTEX Partnership{trademark}. Fourth quarter FY95 report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    The AMTEX Partnership{trademark} is a collaborative research and development program among the US Integrated Textile Industry, the Department of Energy (DOE), the national laboratories, other federal agencies and laboratories, and universities. The goal of AMTEX is to strengthen the competitiveness of this vital industry, thereby preserving and creating US jobs. The operations and program management of the AMTEX Partnership{trademark} is provided by the Program Office. This report is produced by the Program Office on a quarterly basis and provides information on the progress, operations, and project management of the partnership. Progress is reported on the following projects: computer-aided fabric evaluation;more » cotton biotechnology; demand activated manufacturing architecture; electronic embedded fingerprints; on-line process control for flexible fiber manufacturing; rapid cutting; sensors for agile manufacturing; and textile resource conservation.« less

  16. Academic Leadership Development: A Case Study.

    PubMed

    Berman, Audrey

    2015-01-01

    A dean at a private school of nursing implemented a leadership development program for early- to mid-career nursing faculty consisting of one 4-hour evening session per academic quarter for 7 quarters. Eight faculty members who had expressed interest in assuming a leadership role or been recommended by their supervisors as having strong leadership potential were invited to join. Program topics included leadership pathways, legal issues, budgeting and governance, diversity, the political arena, human resources, and student issues. Interviews with participants revealed 6 themes: the support a peer cohort provided, a desire for real-life application, a lack of previous exposure to related content or experiences, new perceptions of themselves as academic nurse leaders, the value of the program as preparation for academic nursing leadership roles, and broad program applicability. Copyright © 2015 Elsevier Inc. All rights reserved.

  17. An investigation of the cratering-induced motions occurring during the formation of bowl-shaped craters. [using high explosive charges as the cratering source

    NASA Technical Reports Server (NTRS)

    Piekutowski, A. J.

    1980-01-01

    The effects of the dynamic processes which occur during crater formation were examined using small hemispherical high-explosive charges detonated in a tank which had one wall constructed of a thick piece of clear plexiglas. Crater formation and the motions of numerous tracer particles installed in the cratering medium at the medium-wall interface were viewed through the wall of this quarter-space tank and recorded with high-speed cameras. Subsequent study and analysis of particle motions and events recorded on the film provide data needed to develop a time-sequence description of the formation of a bowl-shaped crater. Tables show the dimensions of craters produced in a quarter-space tank compared with dimensions of craters produced in normal half-space tanks. Crater growth rate summaries are also tabulated.

  18. Renewable Energy Finance Tracking Initiative (REFTI) Solar Trend Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hubbell, R.; Lowder, T.; Mendelsohn, M.

    This report is a summary of the finance trends for small-scale solar photovoltaic (PV) projects (PV <1 MW), large-scale PV projects (PV greater than or equal to 1 MW), and concentrated solar power projects as reported in the National Renewable Energy Laboratory's Renewable Energy Finance Tracking Initiative (REFTI). The report presents REFTI data during the five quarterly periods from the fourth quarter of 2009 to the first half of 2011. The REFTI project relies exclusively on the voluntary participation of industry stakeholders for its data; therefore, it does not offer a comprehensive view of the technologies it tracks. Despite thismore » limitation, REFTI is the only publicly available resource for renewable energy project financial terms. REFTI analysis offers usable inputs into the project economic evaluations of developers and investors, as well as the policy assessments of public utility commissions and others in the renewable energy industry.« less

  19. Phase I of the Near Term Hybrid Passenger Vehicle Development Program. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-10-01

    The results of Phase I of the Near-Term Hybrid Vehicle Program are summarized. This phase of the program ws a study leading to the preliminary design of a 5-passenger hybrid vehicle utilizing two energy sources (electricity and gasoline/diesel fuel) to minimize petroleum usage on a fleet basis. This report presents the following: overall summary of the Phase I activity; summary of the individual tasks; summary of the hybrid vehicle design; summary of the alternative design options; summary of the computer simulations; summary of the economic analysis; summary of the maintenance and reliability considerations; summary of the design for crash safety;more » and bibliography.« less

  20. Utility Tax Relief Program in the Netherlands

    DTIC Science & Technology

    2010-01-06

    Management Command, Europe Region LQA Living Quarters Allowance VAT Value Added Tax INSPECTOR GENERAL DEPARTMENT OF DEFENSE 400 ARMY NAVY DRIVE...savings on their utility bills. However, for DOD civilians receiving Living Quarters Allowance ( LQA ),2 DOD realizes the cost savings through reduced... LQA payments, unless the civilian’s housing expenses exceed the maximum allowable LQA . 1 For the purpose of this report, DOD personnel refers to

  1. Global Positioning System: Observations on Quarterly Reports from the Air Force

    DTIC Science & Technology

    2016-10-17

    Positioning System : Observations on Quarterly Reports from the Air Force The satellite-based Global Positioning System (GPS) provides positioning, navigation...infrastructure, and transportation safety. The Department of Defense (DOD)—specifically, the Air Force—develops and operates the GPS system , which...programs, including the most recent detailed assessment of the next generation operational control system (OCX) and development of military GPS

  2. The AMTEX Partnership{sup trademark}. Second quarter report. Fiscal year 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lemon, D.K.; Quisenberry, R.K.

    1996-03-01

    This quarterly report details activities of the AMTEX Partnership {sup TM} which is a collaborative research and development program among the U.S. Integrated Textile Industry, the Department of Energy (DOE), the national laboratories, other federal agencies and laboratories, and universities. The goal of AMTEX is to strengthen the competitiveness of this vital industry, thereby preserving and creating U.S. jobs.

  3. Director, Operational Test and Evaluation Report FY�

    DTIC Science & Technology

    1989-01-19

    FIRST QUARTER, FY89 ........... VII-I GLOSSARY OF ACRONYMS ....................................... G -1 0 0 0 * vii "* PART I DOT&E ACTIVITY SUMMARY AAND...ouiteriawere egoiandtion w oit e form sisted of the approved air threat against ahecriteria wer expanded to pr vide ora g fruntsiltdnce iog- more...COMMUNICATIONS TERMINAL-- ~~AN/TRC-179(V)1 ,. S(FORCE-MOBILE) MANPACK P/O AN/GRC-215 GENERATOR SET PU-794/ G (MOD) * COMMUNICATIONS TERMINAL AN/GRC-215 AN

  4. Integrated Marketing Communications: A New Master's Degree Concept.

    ERIC Educational Resources Information Center

    Caywood, Clarke; Ewing, Raymond

    1991-01-01

    Describes how separate graduate degree programs have been fused into an integrated marketing communications program at Northwestern University. Discusses the five-quarter program that includes a core of new marketing communications planning and management classes, professional specialization classes in corporate public relations, advertising, and…

  5. 42 CFR 456.652 - Requirements for an effective utilization control program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... To Make a Satisfactory Showing of an Effective Institutional Utilization Control Program § 456.652... reduction in FFP, the Medicaid agency must make a satisfactory showing to the Administrator, in each quarter...

  6. Quail Egg compared to a quarter

    NASA Technical Reports Server (NTRS)

    2003-01-01

    Quail eggs are small (shown here with a quarter for scale) and develop quickly, making them ideal for space experiments. The Avian Development Facility (ADF) supports 36 eggs in two carousels (below), one of which rotates to provide a 1-g control for comparing to eggs grown in microgravity. The ADF originated in NASA's Shuttle Student Involvement program in the 1980s and was developed under the NASA Small Business Irnovation Research program. In late 2001, the ADF made its first flight and carried eggs used in two investigations, Development and function of the inner-ear balance system in normal and altered gravity environments, and Skeletal development in embryonic quail.

  7. The Savannah River Site`s groundwater monitoring program. Third quarter 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-05-06

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During third quarter 1990 (July through September) EPD/EMS conducted routine sampling of monitoring wells and drinking water locations. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead they aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. All analytical results from third quarter 1990 are listed in thismore » report, which is distributed to all site custodians. One or more analytes exceeded Flag 2 in 87 monitoring well series. Analytes exceeded Flat 2 for the first since 1984 in 14 monitoring well series. In addition to groundwater monitoring, EPD/EMS collected drinking water samples from SRS drinking water systems supplied by wells. The drinking water samples were analyzed for radioactive constituents.« less

  8. New method of metallization for silicon solar cells. First quarterly report, December 15, 1978-March 31, 1979

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Macha, M.

    1979-01-01

    The objective of this program is to develop a low-cost ohmic contact on silicon solar cells based on molybdenum tin metal system. The approach is based on the formulation of a screenable ink composed from molybdenum oxide and tin mixture. The first quarter of this program involved the study of the reduction of MoO/sub 3/ into Mo and the establishing of MoO/sub 3/:Sn ratio. Both tasks have been done in an experimental station constructed for this purpose. The results showed that molybdenum was formed from its oxide at 800/sup 0/C and improved in bonding to silicon at 900/sup 0/C. Amore » 20% MoO/sub 3/-80% Sn mixture was converted into a metallic coating within this temperature range. The next quarter will be concerned with the formulation of screenable ink, calibration of a tube furnace for the firing cycle and evaluation of the metal contact on solar cell structures.« less

  9. 75 FR 56057 - Proposed Information Collection; Comment Request; Broadband Technology Opportunities Program Post...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-15

    ... Information Collection; Comment Request; Broadband Technology Opportunities Program Post-Award Quarterly and... (Recovery Act) establishes and provides $4.7 billion for the Broadband Technology Opportunities Program... million will be made available for competitive grants to expand public computer center capacity; at least...

  10. Making IT Work

    DTIC Science & Technology

    2015-10-01

    system (MAIS) program failed to “achieve a Full Deployment Decision ( FDD ) within five years after funds were first obligated for the program.”14 A...Quarterly Report dated 31 October 2010, highlighted that the MDA had not approved a FDD for ECSS by 31 August 2010, and determined that the program

  11. NRC TLD Direct Radiation Monitoring Network. Volume 15, No. 4: Quarterly progress report, October--December 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Struckmeyer, R.

    This report presents the results of the NRC Direct Radiation Monitoring Network for the fourth quarter of 1995. It provides the ambient radiation levels measured in the vicinity of 75 sites throughout the United States. In addition, it describes the equipment used, monitoring station selection criteria, characterization of the dosimeter response, calibration procedures, statistical methods, intercomparison, and quality assurance program.

  12. Utility Tax Avoidance Program in Germany

    DTIC Science & Technology

    2010-09-29

    Defense Education Activity IMCOM-E Installation Management Command - Europe Region LQA Living Quarters Allowance TRO Tax Relief Office USD(P&R) Under...receive Living Quarters Allowance ( LQA ), which is designed to cover the actual cost for rent, utilities, and other expenses required by law or custom up...to the maximum allowable LQA amount. Benefits of Participation in the UTAP Participation in UTAP allows DOD personnel to avoid paying VAT on their

  13. Joint Force Quarterly, Issue 49, 2nd Quarter 2008: Focus on Airpower

    DTIC Science & Technology

    2008-04-01

    that the next space age will produce wealth (from tourism , energy, mining, and manufacturing) is correct, “the next space age will be marked by a...wealth frontiers include tourism , energy, mining, and manu- facturing. Beyond the impact that space has in supporting earthly economic enterprises, the... tourism , military exchanges, student scholarships, partner city programs, and unrestricted mutual media access and transparency. In sum, we will

  14. Our First Quarter Century of Achievement... Just the Beginning

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Space flight, space science, space applications, aeronautics, tracking and data acquisition, international programs, technology utilization, NASA installations, the NASA launch record, astronauts, and the fine arts program are reviewed in light of NASA's 25th anniversary.

  15. 77 FR 49799 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-April Through June 2012

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-17

    ...-Approved Lung JoAnna Baldwin, MS.. (410) 786-7205 Volume Reduction Surgery Facilities. XIV Medicare-Approved Kate Tillman, RN, (410) 786-9252 Bariatric Surgery MAS. Facilities. XV Fluorodeoxyglucose Stuart...

  16. 77 FR 29648 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-January Through March 2012

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... (Destination Therapy) Facilities. XIII Medicare-Approved Lung Volume Reduction Surgery JoAnna Baldwin, MS (410) 786-7205 Facilities. XIV Medicare-Approved Bariatric Surgery Facilities........ Kate Tillman, RN, MAS...

  17. 76 FR 68467 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-April Through June 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ...-Approved Lung JoAnna Baldwin, (410) 786-7205 Volume Reduction Surgery MS. Facilities. XIV Medicare-Approved Kate Tillman, RN, (410) 786-9252 Bariatric Surgery Facilities. MAS. XV Fluorodeoxyglucose Positron...

  18. Environmental Hazards Assessment Program. Quarterly report, July--September 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This report describes activities and reports on progress for the first quarter (July--September) of the fourth year of the grant to support the Environmental Hazards Assessment Program (EHAP) at the Medical University of South Carolina. It reports progress against the grant objectives and the Program Implementation Plan published at the end of the first year of the grant. The objectives of EHAP stated in the proposal to DOE are to: (1) develop a holistic, national basis for risk assessment, risk management, and risk communication that recognizes the direct impact of environmental hazards on the health and well-being of all; (2)more » develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects; and (3) identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health-oriented aspects of environmental restoration and waste management.« less

  19. Environmental Management Science Program Workshop

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1998-07-01

    This program summary book is a compendium of project summaries submitted by principal investigators in the Environmental Management Science Program and Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program). These summaries provide information about the most recent project activities and accomplishments. All projects will be represented at the workshop poster sessions, so you will have an opportunity to meet with the researchers. The projects will be presented in the same order at the poster session as they are presented in this summary book. Detailed questions about an individual project may be directed to the investigators involved.

  20. FINAL SCIENTIFIC REPORT Southwest United States of America – Distributed Technology Training Consortia (SWUSA-DTTC) Contract Number: DE-EE0006339

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arnold, Kodie

    The Southwest United States of America – Distributed Technology Training Consortia (SWUSA-DTTC) leveraged the highest concentration of renewable resources in the U.S. as well as operation of the leading independent microgrid installations and other distributed technologies to collect and analyze real-time data streams, advance power system simulations and analysis, identify educational and training gaps and develop solutions-focused curricula. The SWUSA-DTTC consortium posed a unique collaboration between universities and utilities to ensure that classes were focused on subjects and topics of interest to the utilities and ones that had practical benefit related to the preparedness for accommodating high penetration of solarmore » and other distributed energy technologies. This approach to have a close collaboration and shared effort to develop the course content and curriculum is unique and a significant departure from conventional course development. This coursework and training was intended to endure over a long time horizon (10-20 year time frame), and include professionals over the entire Southwest region and the rest of the US, and even outreach into foreign countries. Project Objectives In order to support the increase in power systems research, development, and analytical capacity, the SWUSA-DTTC brought together respected professors in Power Systems education, student/professor research and development, and valuable industry and utility experience. Through this program, the partnered universities created and/or modified existing curricula available to students and professionals in the form of university courses, short courses, videos, consortia-led training, and online materials. During this time, the supporting vendors and utilities provided the SWUSA-DTTC with technical advisory roles as well as providing input and feedback in terms of utility and related energy industry needs. The goals were to create power and energy systems training, curricula, and workforce preparedness through the inclusion of data collection and analysis, power systems expertise, and application-specific training activities which build on fundamental principles, modeling and simulation tools, field-immersed training and methods of performance validation. The outcome of the program was to result in better prepared and greater number of graduates ready to contribute to the field of power systems which depend upon the safe, reliable and efficient generation sources which make up an increasingly diverse mix of renewable power. Additionally, the program was to deliver critical training modules which are intended to support mid-career professionals and be woven into utility training programs used all over the country. Discontinuation Summary On September 29, 2014, Electricore received notice of discontinuation of federal funding under subject Award DE-EE0006339. DOE’s notice of discontinuation was the first indication provided to Electricore that the work completed against Task 1 - Program Planning and Evaluation during Budget Period 1 was inadequate. Significantly, the discontinuation was based in large part on the erroneous assertion that many of the tasks were incomplete as indicated in the Continuation Application. However, the Continuation Application was submitted July 29, 2014, while the period of performance for this last quarter in Budget Period 1 did not end until September 30, 2014. Accordingly, the performance for this last quarter in Budget Period 1 will be reported in the upcoming Quarterly Report which is not due until October 30, 2014. Nevertheless, in response to DOE’s letter and in further support of Electricore’s Continuation Application, we are providing a detailed status demonstrating adherence to all program requirements for each Task 1, Budget Period 1 SOPO activity and milestones in response to the DOE review.« less

  1. Summaries of Papers Presented at Photonic Switching Topical Meeting Held in Salt Lake City, Utah on 1-3 March 1989. Technical Digest

    DTIC Science & Technology

    1990-01-31

    a set of codes which will provide a large number of addresses while minimizing interference . We have analyzed the bit error rate (BER) of the...there will be significant crosstalk. The most severe interference will be caused by the unswitched component of the high-intensity pulses. For example...Diagram of Experimental Apparatus Q = Quarter-wave Plate P = Polarising Filter IF = Interference Filter Figure 2. I Oscilloscope trace a. of Kerr

  2. US Army Research Laboratory Materials Center of Excellence. Dynamic Behavior of Noncrystalline and Nanocrystalline Metallic Systems: July 2011-June 2012 Annual Report

    DTIC Science & Technology

    2015-03-01

    Presentations 18 6. High-Rate Loading of Piezoelectric Ceramics 19 6.1 Objective 19 6.2 Quarterly Deliverables 19 6.3 Research Summary 19 6.4...the mechanical properties and to control the failure, with the emphasis on those properties and processes that are unique to BCC materials . The...application to molybdenum. 19 6. High-Rate Loading of Piezoelectric Ceramics Core Faculty: KT Ramesh ARL Collaborators: George Gazonas, Jim McCauley

  3. A Guidance Document for Kentucky's Oil and Gas Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    1998-11-10

    This technical report is a summary of the progress made for "A Guidance Document for Kentucky's Oil and Gas Operators". During this quarter, the document received continued review and editing in an elec-tronic format to satisfy the United States Department of Energy (DOE). Comments received from oil and gas operators reviewing this document prompted contact to be made with the United States Environmental Protection Agency (USEPA) to develop an addendum section to provide better explanation of USEPA requirements for Class II injection wells in Kentucky.

  4. 75 FR 36785 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-January Through March 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ... national coverage determinations (NCDs) affecting specific medical and health care services under Medicare... notification, such as a particular clinical trial or research study that qualifies for Medicare coverage.... 93.773, Medicare--Hospital Insurance, Program No. 93.774, Medicare-- Supplementary Medical Insurance...

  5. 78 FR 53790 - Sunshine Act Meeting; Finance, Budget and Program Committee Meeting of the Board of Directors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-30

    ... NEIGHBORHOOD REINVESTMENT CORPORATION Sunshine Act Meeting; Finance, Budget and Program Committee... PERSON FOR MORE INFORMATION: Erica Hall, Assistant Corporate Secretary (202) 220-2376; [email protected] Education & Counseling VII. Quarterly Program Reports VIII. Financial Report IX. FY13 Corporate Scorecard...

  6. 78 FR 65716 - Sunshine Act Meeting; Finance, Budget & Program Committee Meeting of the Board of Directors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... NEIGHBORHOOD REINVESTMENT CORPORATION Sunshine Act Meeting; Finance, Budget & Program Committee Meeting of the Board of Directors TIME & DATE: 2:00 p.m., Thursday, November 7, 2013. PLACE: Telephonic.... Quarterly Program Reports C. Corporate Scorecard Report D. HUD Counseling Rule E. Grants Report VIII...

  7. Improvements in Cystic Fibrosis Quarterly Visits, Lung Function Tests, and Respiratory Cultures.

    PubMed

    Wooldridge, Jamie L; Mason, Susan; Brusatti, Judith; Albers, Gary M; Noyes, Blakeslee E

    2015-12-01

    The Cystic Fibrosis (CF) Foundation recommends patients attend clinic ≥4 times per year with 4 respiratory cultures and 2 pulmonary function tests (PFTs). However, nationally only 57.4% of patients met these guidelines in 2012. We used a quality improvement program with a goal of 75% of our patients meeting this care guideline by 2012. A 2-stage program was started in 2011. Stage 1: education of patients/caregivers on importance of quarterly visits. Stage 2: quarterly tracking system of patient appointments. Data on clinic visits, respiratory cultures, and PFTs were collected from the CF registry from January 2009 through December 2013. Statistical process control charts were used to track improvements. The average number of clinic visits increased significantly from 4.6 ± 2.3 in 2009 to 6.3 ± 4.6 in 2013 (P < .0001). The percentage of patients ages 6 through 18 completing a clinic visit, PFT, and respiratory culture per quarter increased significantly from 76.2% during 2009 to 86.4% in 2013. The percentage of patients completing ≥4 clinic visits with 4 respiratory cultures and 2 PFTs improved significantly from 47.5% in 2009 to 71.0% in 2013 (P < .0001). A tracking system of patient appointments significantly improved adherence to the care guidelines better than education alone. The multiple-stage quality improvement program we implemented may be modifiable and able to be integrated in other CF centers or other multiple disciplinary chronic illness care centers. Copyright © 2015 by the American Academy of Pediatrics.

  8. 77 FR 9931 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-October Through December 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... Ashby (410) 786-6322 Coverage Provisions. XI National Oncologic Positron Emission Stuart Caplan, RN, MAS... Tillman, RN, MAS (410) 786-9252 Facilities. XV Fluorodeoxyglucose Positron Emission Stuart Caplan, RN, MAS...

  9. Payload test philosophy. [to provide confidence in Shuttle structural math models

    NASA Technical Reports Server (NTRS)

    Mayhew, D.

    1979-01-01

    Shuttle payload test philosophy is discussed with reference to testing to provide confidence in Shuttle structural math models. Particular attention is given the Shuttle quarter-scale program and the Mated Vertical Ground Vibration Test Program.

  10. 77 FR 67368 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-July through September 2012

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ...) Facilities. XIII Medicare-Approved Lung JoAnna Baldwin, MS. (410) 786-7205 Volume Reduction Surgery Facilities. XIV Medicare-Approved Bariatric Kate Tillman, RN, (410) 786-9252 Surgery Facilities. MAS. XV...

  11. Prototype solar heating and hot water systems

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Progress made in the development of a solar hot water and space heating system is described in four quarterly reports. The program schedules, technical status and other program activities from 6 October 1976 through 30 September 1977 are provided.

  12. The Savannah River Site's groundwater monitoring program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted by EPD/EMS in the first quarter of 1991. In includes the analytical data, field data, data review, quality control, and other documentation for this program, provides a record of the program's activities and rationale, and serves as an official document of the analytical results.

  13. Creating objective and measurable postgraduate year 1 residency graduation requirements.

    PubMed

    Starosta, Kaitlin; Davis, Susan L; Kenney, Rachel M; Peters, Michael; To, Long; Kalus, James S

    2017-03-15

    The process of developing objective and measurable postgraduate year 1 (PGY1) residency graduation requirements and a progress tracking system is described. The PGY1 residency accreditation standard requires that programs establish criteria that must be met by residents for successful completion of the program (i.e., graduation requirements), which should presumably be aligned with helping residents to achieve the purpose of residency training. In addition, programs must track a resident's progress toward fulfillment of residency goals and objectives. Defining graduation requirements and establishing the process for tracking residents' progress are left up to the discretion of the residency program. To help standardize resident performance assessments, leaders of an academic medical center-based PGY1 residency program developed graduation requirement criteria that are objective, measurable, and linked back to residency goals and objectives. A system for tracking resident progress relative to quarterly progress targets was instituted. Leaders also developed a focused, on-the-spot skills assessment termed "the Thunderdome," which was designed for objective evaluation of direct patient care skills. Quarterly data on residents' progress are used to update and customize each resident's training plan. Implementation of this system allowed seamless linkage of the training plan, the progress tracking system, and the specified graduation requirement criteria. PGY1 residency requirements that are objective, that are measurable, and that attempt to identify what skills the resident must demonstrate in order to graduate from the program were developed for use in our residency program. A system for tracking the residents' progress by comparing residents' performance to predetermined quarterly benchmarks was developed. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  14. Subgrain refinement strengthening. Second quarterly progress report, January 1, 1975-March 31, 1975. [Epsilon-Brite 26-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klundt, R.; Walser, B.; Monma, Y.

    During the past quarter (January-March 1975) we have initiated mechanical properties studies on type 304 stainless steel and on a ferritic alloy, E-Brite 26-1. Purpose of these studies was to establish a sound data base from which the alloys specifically chosen for this program can be evaluated (namely, ferritic steel, precipitation hardening austenitic stainless steel and a nickel rich austenitic alloy).

  15. Occidental vertical modified in situ process for the recovery of oil from oil shale. Phase II. Quarterly progress report, September 1-November 30, 1979

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McDermott, William F.

    1979-12-01

    The major activities at OOSI's Logan Wash site during the quarter were: driving the access drifts towards the underground locations for Retorts 7 and 8; manway raise boring; constructing the change house; rubbling the first lift of Mini-Retort (MR)1; preparing the Mini-Retorts for tracer testing; coring of Retort 3E; and beginning the DOE instrumentation program.

  16. Applying Financial Portfolio Analysis to Government Program Portfolios

    DTIC Science & Technology

    2007-06-01

    himself points out, “The Rational Man, like the unicorn , does not exist” (Markowitz, 1959). The various investor assumptions presented above break down...originally envisioned benefits quickly grow (Levine, 2005). As a recent Government Accountability Office report notes, the sheer size of IT spending in the...shows no change in EAC for the first three quarters and a decrease in the fourth quarter- although the SV and CV shrink and grow during the same period

  17. Natural gas imports and exports. First quarter report 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-08-01

    The Office of Fuels Programs Prepares quarterly reports Summarizing the data provided by companies authorized to import or export natural gas. Companies are required, as a condition of their authorizations, to file quarterly reports with the OFP. This report is for the first quarter of 1994 (January--March). Attachment A shows the percentage of takes to maximum firm contract levels and the weighted average per unit price for each of the long-term importers during the five most recent reporting quarters. Attachment B shows volumes and prices of gas purchased by long-term importers and exporters during the past twelve months. Attachment Cmore » shows volume and price information for gas imported on a short-term basis. Attachment D shows the gas exported on a short-term basis to Canada and Mexico. During the first three months of 1994, data indicates that gas imports grew by about 14 percent over the level of the first quarter of 1993 (668 vs. 586 Bcf), with Canadian and Algerian imports increasing by 12 and 53 percent, respectively. During the same time period, exports declined by 15 percent (41 vs. 48 Bcf). Exports to Canada increased by 10 percent from the 1993 level (22 vs. 20 Bcf) and exports to Mexico decreased by 64 percent (5 vs. 14 Bcf).« less

  18. Composite armored vehicle advanced technology demonstator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ostberg, D.T.; Dunfee, R.S.; Thomas, G.E.

    1996-12-31

    Composite structures are a key technology needed to develop future lightweight combat vehicles that are both deployable and survivable. The Composite Armored Vehicle Advanced Technology Demonstrator Program that started in fiscal year 1994 will continue through 1998 to verily that composite structures are a viable solution for ground combat vehicles. Testing thus far includes material characterization, structural component tests and full scale quarter section tests. Material and manufacturing considerations, tests, results and changes, and the status of the program will be described. The structural component tests have been completed successfully, and quarter section testing is in progress. Upon completion ofmore » the critical design review, the vehicle demonstrator will be Fabricated and undergo government testing.« less

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhu, Charles

    In the 2nd quarter of 2012, a program was formally initiated at Delta Products to develop smart-grid-enabled Electric Vehicle Supply Equipment (EVSE) product for residential use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE-OE0000590. Delta products was the prime contractor to DOE during the three year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Detroit Edison DTE, Mercedes Benz Research and Development North America, and kVA. This report summarizes the program and describes the key research outcomes ofmore » the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of an EVSE prototype system is described in detail, culminating in prototypes shipped to Department of Energy Laboratories for final qualification. After the program history is reviewed, the key attributes of the resulting EVSE are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this EVSE to meet or exceed DOE's targets for this program, including: construction of a working product-intent prototype of a smart-grid-enabled EVSE, with suitable connectivity to grid management and home-energy management systems, revenue-grade metering, and related technical functions; and cost reduction of 50% or more compared to typical market priced EVSEs at the time of DOE's funding opportunity announcement (FOA), which was released in mid 2011. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical information relating to the product design and test results are contained in the appendices to this report.« less

  20. Web-based Comparative Patient-reported Outcome Feedback to Support Quality Improvement and Comparative Effectiveness Research in Total Joint Replacement.

    PubMed

    Zheng, Hua; Li, Wenjun; Harrold, Leslie; Ayers, David C; Franklin, Patricia D

    2014-01-01

    Patient-reported outcomes (PROs) are rarely included in quality monitoring systems, surgeon comparative feedback reports, or registries. We present the design and implementation of a secure website in a federally funded research program-Function and Outcomes Research for Comparative Effectiveness in Total Joint Replacement (FORCE-TJR)-to return comparative PRO reports to participating surgeons, in addition to including traditional quality measures, in order to monitor and improve quality and health outcomes. The surgeon-specific comparative PRO reports were designed and structured based on user input for content, data elements, integration, and display. Three questions are addressed regarding the knee and hip joint symptom profiles of patients before TJR, as well as outcomes of surgery. The website is organized with a hierarchical structure to display data at national, practice, and individual surgeon levels, and provides a comprehensive site-level executive summary and surgeon-level data reports that can be downloaded. As of September 2014, over 22,000 patients were enrolled from more than 130 surgeons in 22 states. The reporting website was launched in September 2012 and has been updated quarterly for all surgeons to review their site- and individual-specific outcomes data compared to national benchmarks. In this novel system, quarterly comparative surgeon feedback extends beyond traditional measures of complication rates to include PROs of pain relief and functional gain. We anticipate that this enhanced data will facilitate patient-centered quality improvement (QI) and outcomes research from the registry. As the Centers for Medicare & Medicaid Services (CMS) and other insurers consider future implementation of PROs, surgeons will increasingly need comparative data by which to self-monitor their practice outcomes.

  1. Indian Education and Training Opportunities at Columbia Jr. College, [Columbia, California.

    ERIC Educational Resources Information Center

    Columbia Junior Coll., CA.

    The purpose of this project was to develop a transitional instructional program to serve out-of-school and drop-out American Indian youth entering vocational education programs in forest technology, fire science, heavy equipment maintenance and health occupations. The project was designed to develop a 3-quarter transitional program concerned with…

  2. The University Seminar Program: A Formative Evaluation of the First Year.

    ERIC Educational Resources Information Center

    Litwin, James; And Others

    In the Fall Quarter, 1975, the University Division of General Studies introduced a University Seminar Program whose aim was to provide new students, freshmen and transfers, with a more humanistic introduction to Bowling Green State University. The results and conclusions of the evaluation study regarding the first year of the program's operation…

  3. Cooperative Education in the Associated Schools of Construction.

    ERIC Educational Resources Information Center

    Chapin, L.; Roudebush, Wilfred H.; Krone, Stephen J.

    2003-01-01

    A survey of Associated Schools of Construction construction management programs (54 of 88 responded) indicated that 91% have some type of cooperative education program; 58% require it. Most programs have two work terms (either quarters or semesters) of coop earning 3-4 credit hours per term. The level of satisfaction among students, faculty and…

  4. 76 FR 21739 - Notice of Public Information Collection(s) Being Reviewed by the Federal Communications...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... commercial limits on children's television programming. The records must be placed in the public file quarterly. The FCC Form 398, Children's Television Programming Reports, reflecting efforts made by the... radio stations, a list of community issues addressed by the station's programming. This list is kept on...

  5. 1993 at a Glance: Executive Summaries of Reports from the Office of Research and Evaluation.

    ERIC Educational Resources Information Center

    Austin Independent School District, TX. Office of Research and Evaluation.

    This compilation contains executive summaries of 13 program evaluations conducted by the Office of Research and Evaluation of the Austin Independent School District (AISD) (Texas), as well as short summary reports on 3 programs. The following summaries are included: (1) "1991-92 Dropout Report"; (2) "Faculty/Staff Recruitment…

  6. 7 CFR 4288.113 - Payment record requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE PAYMENT PROGRAMS Advanced Biofuel Payment... for Program payments, an advanced biofuel producer must maintain records for all relevant fiscal years and fiscal year quarters for each advanced biofuel facility indicating: (a) The type of eligible...

  7. U.S. advanced launch vehicle technology programs : Quarterly Launch Report : special report

    DOT National Transportation Integrated Search

    1996-01-01

    U.S. firms and U.S. government agencies are jointly investing in advanced launch vehicle technology. This Special Report summarizes U.S. launch vehicle technology programs and highlights the changing : roles of government and industry players in pick...

  8. 34 CFR 668.8 - Eligible program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... least a one-academic-year training program that leads to a certificate, or other nondegree recognized... quarter hours; (iii) Must provide undergraduate training that prepares a student for gainful employment in...) Provide undergraduate training that prepares a student for gainful employment in a recognized occupation...

  9. 34 CFR 668.8 - Eligible program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... least a one-academic-year training program that leads to a certificate, or other nondegree recognized... quarter hours; (iii) Must provide undergraduate training that prepares a student for gainful employment in...) Provide undergraduate training that prepares a student for gainful employment in a recognized occupation...

  10. 34 CFR 668.8 - Eligible program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... least a one-academic-year training program that leads to a certificate, or other nondegree recognized... quarter hours; (iii) Must provide undergraduate training that prepares a student for gainful employment in...) Provide undergraduate training that prepares a student for gainful employment in a recognized occupation...

  11. Innovative instructional strategy using cinema films in an undergraduate nursing course.

    PubMed

    Hyde, Norlyn B; Fife, Elizabeth

    2005-01-01

    Educators can develop innovative instructional strategies to engage students within the philosophical framework of Constructivism. To that end, the authors used films--Hollywood movies--to enhance their curriculum on neurological and psychopathological illnesses. During the fourth quarter of a seven-quarter associate degree nursing program, students developed case studies of the disorders portrayed in selected films. The authors outline the methods used to implement this approach and discuss evaluations from student and faculty perspectives.

  12. Joint Force Quarterly. Issue 70, 3rd Quarter, July 2013

    DTIC Science & Technology

    2013-07-01

    such as solar panels and wind turbines for battlefield operations in Iraq. General Zilmer’s memo noted that without renewable power, U.S. forces...programs. The private sector may be leveraged through other incentives. Tax policy could encour- age the importation of solar panels, wind turbines , and...officers with infantry battalions—to name a few.31 In short, primary collection is done at the small unit level where there are “many sensors ,” and

  13. Advanced Thermal Emission Imaging Systems Definition and Development

    NASA Technical Reports Server (NTRS)

    Blasius, Karl; Nava, David (Technical Monitor)

    2002-01-01

    Santa Barbara Remote Sensing (SBRS), Raytheon Company, is pleased to submit this quarterly progress report of the work performed in the third quarter of Year 2 of the Advanced THEMIS Project, July through September 2002. We review here progress in the proposed tasks. During July through September 2002 progress was made in two major tasks, Spectral Response Characterization and Flight Instrument Definition. Because of staffing problems and technical problems earlier in the program we have refocused the remaining time and budget on the key technical tasks. Current technical problems with a central piece of test equipment has lead us to request a 1 quarter extension to the period of performance. This request is being made through a separate letter independent of this report.

  14. International energy indicators

    NASA Astrophysics Data System (ADS)

    Bauer, E. K.

    1980-08-01

    Data are compiled in tables and graphs on Iran and Saudi Arabia: crude oil capacity, production, and shut-in, June 1974 to July 1980; OPEC (Ex-Iran and Saudi Arabia); capacity, production, and shut-in, June 1974 to June 1980; non-OPEC Free World and US production of crude oil, January 1973 to May 1980; oil stocks: Free World, US, Japan, and Europe (landed), 1973 - 1st quarter 1980; petroleum consumption by industrial countries, January 1973 to February 1980; USSR crude oil production, January 1974 to July 1980; Free World and US nuclear generation capacity, January 1973 to June 1980; US import of crude oil and products, January 1973 to July 1980; landed cost of Saudi crude in current and 1974 dollars, April 1974 to May 1980; US trade in coal, January 1973 to June 1980; summary of US merchandise trade, 1976 to June 1980; and energy/GNP ratio, 1974-1st quarter 1980. The highlight of each is summarized in the table of contents.

  15. Routine Leak Testing in Colorectal Surgery in the Surgical Care and Outcomes Assessment Program

    PubMed Central

    Kwon, Steve; Morris, Arden; Billingham, Richard; Frankhouse, Joseph; Horvath, Karen; Johnson, Morrie; McNevin, Shane; Simons, Anthony; Symons, Rebecca; Steele, Scott; Thirlby, Richard; Whiteford, Mark; Flum, David R.

    2014-01-01

    Objective To evaluate the effect of routine anastomotic leak testing (performed to screen for leaks) vs selective testing (performed to evaluate for a suspected leak in a higher-risk or technically difficult anastomosis) on outcomes in colorectal surgery because the value of provocative testing of colorectal anastomoses as a quality improvement metric has yet to be determined. Design Observational, prospectively designed cohort study. Setting Data from Washington state’s Surgical Care and Outcomes Assessment Program (SCOAP). Patients Patients undergoing elective left-sided colon or rectal resections at 40 SCOAP hospitals from October 1, 2005, to December 31, 2009. Interventions Use of leak testing, distinguishing procedures that were performed at hospitals where leak testing was selective (<90% use) or routine (≥90% use) in a given calendar quarter. Main Outcome Measure Adjusted odds ratio of a composite adverse event (CAE) (unplanned postoperative intervention and/or in-hospital death) at routine testing hospitals. Results Among 3449 patients (mean [SD] age, 58.8[14.8] years; 55.0% women), the CAE rate was 5.5%. Provocative leak testing increased (from 56% in the starting quarter to 76% in quarter 16) and overall rates of CAE decreased (from 7.0% in the starting quarter to 4.6% in quarter 16; both P ≤ .01) over time. Among patients at hospitals that performed routine leak testing, we found a reduction of more than 75% in the adjusted risk of CAEs (odds ratio, 0.23; 95% CI, 0.05–0.99). Conclusion Routine leak testing of left-sided colorectal anastomoses appears to be associated with a reduced rate of CAEs within the SCOAP network and meets many of the criteria of a worthwhile quality improvement metric. PMID:22508778

  16. Routine leak testing in colorectal surgery in the Surgical Care and Outcomes Assessment Program.

    PubMed

    Kwon, Steve; Morris, Arden; Billingham, Richard; Frankhouse, Joseph; Horvath, Karen; Johnson, Morrie; McNevin, Shane; Simons, Anthony; Symons, Rebecca; Steele, Scott; Thirlby, Richard; Whiteford, Mark; Flum, David R

    2012-04-01

    To evaluate the effect of routine anastomotic leak testing (performed to screen for leaks) vs selective testing (performed to evaluate for a suspected leak in a higher-risk or technically difficult anastomosis) on outcomes in colorectal surgery because the value of provocative testing of colorectal anastomoses as a quality improvement metric has yet to be determined. Observational, prospectively designed cohort study. Data from Washington state's Surgical Care and Outcomes Assessment Program (SCOAP). Patients undergoing elective left-sided colon or rectal resections at 40 SCOAP hospitals from October 1, 2005, to December 31, 2009. Use of leak testing, distinguishing procedures that were performed at hospitals where leak testing was selective (<90% use) or routine (≥ 90% use) in a given calendar quarter. Adjusted odds ratio of a composite adverse event (CAE) (unplanned postoperative intervention and/or in-hospital death) at routine testing hospitals. Among 3449 patients (mean [SD] age, 58.8 [14.8] years; 55.0% women), the CAE rate was 5.5%. Provocative leak testing increased (from 56% in the starting quarter to 76% in quarter 16) and overall rates of CAE decreased (from 7.0% in the starting quarter to 4.6% in quarter 16; both P ≤ .01) over time. Among patients at hospitals that performed routine leak testing, we found a reduction of more than 75% in the adjusted risk of CAEs (odds ratio, 0.23; 95% CI, 0.05-0.99). Routine leak testing of left-sided colorectal anastomoses appears to be associated with a reduced rate of CAEs within the SCOAP network and meets many of the criteria of a worthwhile quality improvement metric.

  17. Thermal energy storage subsystems. A collection of quarterly reports

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The design, development, and progress toward the delivery of three subsystems is discussed. The subsystem used a salt hydrate mixture for thermal energy storage. The program schedules, technical data, and other program activities from October 1, 1976, through December 31, 1977 are presented.

  18. Developing a Taxonomy of Institutional Sponsored Work Experience.

    ERIC Educational Resources Information Center

    Heinemann, Harry N.; Wilson, James W.

    1995-01-01

    The name of the work-integrated education program, its learning objectives, and other program characteristics were gathered from 18 colleges/universities and 2 community colleges. Three-quarters use internship, practicum, or co-op. Factor analysis grouped objectives as cognitive, communication, job seeking, personal development, career…

  19. Telescience Testbed Pilot Program

    NASA Technical Reports Server (NTRS)

    Gallagher, Maria L. (Editor); Leiner, Barry M. (Editor)

    1988-01-01

    The Telescience Testbed Pilot Program is developing initial recommendations for requirements and design approaches for the information systems of the Space Station era. During this quarter, drafting of the final reports of the various participants was initiated. Several drafts are included in this report as the University technical reports.

  20. 76 FR 48563 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-January Through March 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-08

    ...-7205 Ventricular Assist Device (Destination Therapy) Facilities. XIII Medicare-Approved Lung JoAnna...-Approved Ventricular Assist Device (Destination Therapy) Facilities, Addendum XIII: Lung Volume Reduction...-Approved Ventricular Assist Device (Destination Therapy) Facilities (January Through March 2011) Addendum...

  1. Marketing the Job Training Partnership Act.

    ERIC Educational Resources Information Center

    Markowicz, Arlene, Ed.; And Others

    1984-01-01

    This quarterly contains 11 bulletins that profile marketing campaigns for the Job Training Partnership Act (JTPA) that have been implemented successfully in local programs throughout the United States. For each program, the description provides information on the operator, funding, results, time span, background, marketing/public relations…

  2. (Development of advanced models of the MCC full expansion (quiet) engine): First quarterly report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This is the first quarterly report to the Department of Energy on the progress associated with the development of advanced models of the MCC full expansion (quiet) engine. These models will be evaluated in successive steps and eventually incorporated into a lawn mower for the purpose of commercializing the engine for small wheeled lawn and garden applications. During the first three months of the program (July 1 thru Sept 30), the Phase I design was basically completed with the exception of some engine/lawn mower interface hardware which will be completed during the final stages of the development program after wemore » have selected a lawn mower deck. Rick Erickson, the design engineer for the program, completed the initial parts drawings utilizing the computer drafting system together with guidance from Fredrick Erickson, the program principal engineer and Jeff Erickson, who is in charge of manufacturing the engines. A miniature copy of these drawings is included in the appendix for your review.« less

  3. Darbepoetin alfa therapeutic interchange protocol for anemia in dialysis.

    PubMed

    Brophy, Donald F; Ripley, Elizabeth Bd; Kockler, Denise R; Lee, Seina; Proeschel, Lori A

    2005-11-01

    Erythropoiesis-stimulating proteins, such as erythropoietin alfa and darbepoetin alfa, have positively impacted anemia management. These medications improve patient outcomes and quality of life. Their costs, however, remain a major barrier for health systems. To evaluate the development, implementation, and cost-effectiveness of an inpatient therapeutic interchange protocol for erythropoiesis-stimulating proteins at a large, tertiary care, university-affiliated health system. Virginia Commonwealth University Health System (VCUHS) developed and implemented a therapeutic interchange program to convert therapy for all inpatients undergoing dialysis from erythropoietin alfa to darbepoetin alfa for treatment of chronic kidney disease-related anemia. An evaluation of the economic impact of this program on drug expenditures over a fiscal quarter (2003) was conducted using historical comparator data (2002). Preliminary evaluation of the program demonstrated cost-savings and reduced drug utilization of erythropoiesis-stimulating proteins in hospitalized dialysis patients. For the first quarter of 2003 compared with the first quarter of 2002, VCUHS realized a cost-savings of nearly 10,000 US dollars, which was related to the program's aggressive screening procedure. When these data were normalized for equal numbers of patients in each group receiving one of the drugs, the actual cost-savings was over 2000 US dollars. These cost-savings are largely due to reduced utilization of these expensive biotechnology products with implementation of a dosing protocol. VCUHS has successfully developed and implemented a darbepoetin alfa therapeutic interchange protocol for hospitalized dialysis patients. This has translated into reduced use of erythropoiesis-stimulating proteins, resulting in cost-savings for the health system.

  4. Characterization of open-cycle coal-fired MHD generators. Quarterly technical summary report No. 6, October 1--December 31, 1977. [PACKAGE code

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kolb, C.E.; Yousefian, V.; Wormhoudt, J.

    1978-01-30

    Research has included theoretical modeling of important plasma chemical effects such as: conductivity reductions due to condensed slag/electron interactions; conductivity and generator efficiency reductions due to the formation of slag-related negative ion species; and the loss of alkali seed due to chemical combination with condensed slag. A summary of the major conclusions in each of these areas is presented. A major output of the modeling effort has been the development of an MHD plasma chemistry core flow model. This model has been formulated into a computer program designated the PACKAGE code (Plasma Analysis, Chemical Kinetics, And Generator Efficiency). The PACKAGEmore » code is designed to calculate the effect of coal rank, ash percentage, ash composition, air preheat temperatures, equivalence ratio, and various generator channel parameters on the overall efficiency of open-cycle, coal-fired MHD generators. A complete description of the PACKAGE code and a preliminary version of the PACKAGE user's manual are included. A laboratory measurements program involving direct, mass spectrometric sampling of the positive and negative ions formed in a one atmosphere coal combustion plasma was also completed during the contract's initial phase. The relative ion concentrations formed in a plasma due to the methane augmented combustion of pulverized Montana Rosebud coal with potassium carbonate seed and preheated air are summarized. Positive ions measured include K/sup +/, KO/sup +/, Na/sup +/, Rb/sup +/, Cs/sup +/, and CsO/sup +/, while negative ions identified include PO/sub 3//sup -/, PO/sub 2//sup -/, BO/sub 2//sup -/, OH/sup -/, SH/sup -/, and probably HCrO/sub 3/, HMoO/sub 4//sup -/, and HWO/sub 3//sup -/. Comparison of the measurements with PACKAGE code predictions are presented. Preliminary design considerations for a mass spectrometric sampling probe capable of characterizing coal combustion plasmas from full scale combustors and flow trains are presented and discussed.« less

  5. Los Angeles County Juvenile Justice Crime Prevention Act. RAND Quarterly Report, October 2008. TR-621-LACPD

    ERIC Educational Resources Information Center

    Fain, Terry; Turner, Susan; Ridgeway, Greg

    2008-01-01

    In July 2008, RAND Corporation staff conducted Correctional Program Checklist (CPC) assessments of five home-based programs (Asian Youth Center, Communities in Schools, Inter-Agency Drug Abuse Recovery Programs, Soledad Enrichment Action, and Stars Behavioral Health Group) as part of its ongoing evaluation of Juvenile Justice Crime Prevention Act…

  6. Real Estate Education: A Curriculum Guide for a Two-year Post Secondary Program.

    ERIC Educational Resources Information Center

    Overton, R. Jean

    This curriculum guide was designed to assist in the development of associate degree programs and/or options for real estate education in North Carolina community colleges. The real estate education program prescribed by this guide spans six academic quarters. The 28 courses listed cover such subject areas as real estate fundamentals, human…

  7. Development of an Applied Fisheries Science Program for Native Alaskans at Sheldon Jackson College (Sitka, Alaska). Third Progress Report, 1 January 1976.

    ERIC Educational Resources Information Center

    Seifert, Mel

    Covering the period between July 1 to December 31, 1976, this third semi-annual report on the Applied Fishery Science Program operative at Sheldon Jackson College in Sitka, Alaska deals primarily with the first quarter of hatchery and educational program operation. Specifically, this report addresses the following: Program Objectives; Advisory…

  8. The Readmission Reduction Program of Kaiser Permanente Southern California—Knowledge Transfer and Performance Improvement

    PubMed Central

    Tuso, Philip; Huynh, Dan Ngoc; Garofalo, Lynn; Lindsay, Gail; Watson, Heather L; Lenaburg, Douglas L; Lau, Helen; Florence, Brandy; Jones, Jason; Harvey, Patti; Kanter, Michael H

    2013-01-01

    In 2011, Kaiser Permanente Northwest Region (KPNW) won the Lawrence Patient Safety Award for its innovative work in reducing hospital readmission rates. In 2012, Kaiser Permanente Southern California (KPSC) won the Transfer Projects Lawrence Safety Award for the successful implementation of the KPNW Region’s “transitional care” bundle to a Region that was almost 8 times the size of KPNW. The KPSC Transition in Care Program consists of 6 KPNW bundle elements and 2 additional bundle elements added by the KPSC team. The 6 KPNW bundle elements were risk stratification, standardized discharge summary, medication reconciliation, a postdischarge phone call, timely follow-up with a primary care physician, and a special transition phone number on discharge instructions. The 2 additional bundle elements added by KPSC were palliative care consult if indicated and a complex-case conference. KPSC has implemented most of the KPNW and KPSC bundle elements during the first quarter of 2012 for our Medicare risk population at all of our 13 medical centers. Each year, KPSC discharges approximately 40,000 Medicare risk patients. After implementation of bundle elements, KPSC Medicare risk all-cause 30-day Healthcare Effectiveness Data and Information Set readmissions observed-over-expected ratio and readmission rates from December 2010 to November 2012 decreased from approximately 1.0 to 0.80 and 12.8% to 11%, respectively. PMID:24355891

  9. The Savannah River Site's Groundwater Monitoring Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-01-10

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site's (SRS) Groundwater Monitoring Program. During second quarter 1991 EPD/EMS conducted extensive sampling of monitoring wells. EPD/EMS established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria do not define contamination levels; instead, they aid personnel in sample scheduling, interpretation of data, and trend identification. Beginning in 1991, the flagging criteria are based on EPA drinking water standards and method detection limits. A detailed explanation of the current flagging criteria is presented in the Flagging Criteria section of this document.more » Analytical results from second quarter 1991 are listed in this report.« less

  10. Sampling results, DNAPL monitoring well GW-729, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Drier, R.B.; Caldanaro, A.J.

    1996-12-01

    This document, Sampling Results, DNAPL Monitoring Well G W-729, Third Quarter FY 1995 through Third Quarter FY 1996, was performed under Work Breakdown Structure 1.4.12.1.1.02 (Activity Data Sheet 2312, `Bear Creek Valley`). This document provides the Environmental Restoration Program with groundwater concentrations for nonradionuclides in the vicinity of the Y-12 Burial Grounds. These data can be used to determine reference concentrations for intermediate and deep groundwater systems.

  11. Boundary Control Systems, Assessment Remedial Investigation, Version 2. 1. Volume 1

    DTIC Science & Technology

    1988-12-01

    ALLUVIAL WELLS CALCULATED TRANSMISSIVITY VALUES. AND ALLUVIAL WELLS MONITORED. . FOR WATER LEVELS FY87 A.? WELL SITING RATIONALE 10 A-3 WELL COMPLETION...29 Contour Map of Transmissivity of the Alluvial Aquifer 3rd Quarter FY 1987 B-30 Potentiometric Surface, Denver Formation Sand Zone 4 3rd Quarter FY...Monitoring 2-10 2.2-2 Chemical Analysis - Task 25 Anal-tical Program ;-14 4.1-1 Transmissivity (T), Hydraulic Conductivity (K), and 4-12 Apparent Specific

  12. Enhanced oil recovery utilizing high-angle wells in the Frontier Formation, Badger Basin Field, Park County, Wyoming. Quarterly technical progress report, 1 March 1993--30 June 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fortmann, R.G.; Walker, J.P.

    1993-07-10

    Sierra Energy Company`s targeted goals during the third quarter of this Cooperative Agreement included the following objectives from the Statement of Work: in Phase 2A, completion of subtask 2.1.2--acquire best possible field data in the 3-D seismic program; and initiation of Subtask 2.1.3--process acquired 3-D seismic data. Technical progress is described for these tasks.

  13. Energy and Environmental Insecurity (Joint Force Quarterly, Issue 55, 4th Quarter 2009)

    DTIC Science & Technology

    2009-01-01

    Energy and Environmental Insecurity By r i c h a r D B . a n D r e s Dr. Richard B. Andres is Energy and Environment Security and Policy Chair in...security, they are as likely referring to carbon emissions as to energy self -reliance and affordable oil. Moreover, the solutions that the international...2009 4. TITLE AND SUBTITLE Energy and Environmental Insecurity 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d

  14. The AMTEX Partnership{trademark}. First quarter report, Fiscal year 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-12-01

    The AMTEX Partnership is a collaborative research and development program among the US Integrated Textile Industry, DOE, the National Laboratories, other federal agencies and laboratories, and universities. The goal of AMTEX is to strengthen the competitiveness of this vital industry, thereby preserving and creating US jobs. Topics in this quarters report include: computer-aided fabric evaluation, cotton biotechnology, demand activated manufacturing architecture, electronic embedded fingerprints, on-line process control in flexible fiber manufacturing, rapid cutting, sensors for agile manufacturing, and textile resource conservation.

  15. Fatal musculoskeletal injuries of Quarter Horse racehorses: 314 cases (1990-2007).

    PubMed

    Sarrafian, Tiffany L; Case, James T; Kinde, Hailu; Daft, Barbara M; Read, Deryck H; Moore, Janet D; Uzal, Francisco A; Stover, Susan M

    2012-10-01

    To determine major causes of death and the anatomic location of musculoskeletal injuries in Quarter Horse racehorses in California. Retrospective case series. 314 Quarter Horse racehorses with musculoskeletal injuries that were necropsied through the California Horse Racing Board Postmortem Program from 1990 to 2007. Postmortem pathology reports were retrospectively reviewed. Musculoskeletal injuries were categorized by anatomic region and described. The number of Quarter Horse starts and starters for the same period of time were obtained from a commercial database for determination of fatal injury incidence. Musculoskeletal injuries accounted for 314 of the 443 (71 %) Quarter Horse racehorses that died during the 18-year study period. Fatal musculoskeletal injuries occurred at a rate of 2.0 deaths/1,000 race starts and 18.6 deaths/1,000 horses that started a race. Musculoskeletal injuries occurred predominantly during racing (84%) and in the forelimbs (81%). The most common fatal musculoskeletal injuries were metacarpophalangeal and metatarsophalangeal joint (fetlock) support injuries (40%) and carpal (24%), vertebral (10%), and scapular (8%) fractures. Proximal interphalangeal (pastern) joint luxations resulted in death of 3% of horses. Fracture configurations of some bones were consistent with those of Thoroughbred racehorses. Evidence of preexisting stress remodeling of bone was reported for some fractures. Knowledge of common locations and types of fatal musculoskeletal injuries in racing Quarter Horses may enhance practitioners' ability to detect mild injuries early, rest horses, and help prevent catastrophic injuries.

  16. Checklist of Serengeti Ecosystem Grasses

    PubMed Central

    Ficinski, Paweł; Vorontsova, Maria

    2016-01-01

    Abstract We present the first taxonomic checklist of the Poaceae species of the Serengeti, Tanzania. A review of the literature and herbarium specimens recorded 200 species of grasses, in line with similar studies in other parts of East Africa. The checklist is supported by a total of 939 herbarium collections. Full georeferenced collection data is made available alongside a summary checklist in pdf format. More than a quarter of the species are known from a single collection highlighting the need for further research, especially concerning the rare species and their distribution. PMID:27226761

  17. ARIES Oxide Production Program Annual Report - FY14

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelley, Evelyn A.; Dinehart, Steven Mark

    A summary of the major accomplishments (September), milestones, financial summary, project performance and issues facing the ARIES Oxide Production Program at the close of FY14 is presented in this Executive Summary. Annual accomplishments are summarized in the body of the report.

  18. Rocket exhaust plume computer program improvement. Volume 1: Summary: Method of characteristics nozzle and plume programs

    NASA Technical Reports Server (NTRS)

    Ratliff, A. W.; Smith, S. D.; Penny, N. M.

    1972-01-01

    A summary is presented of the various documents that discuss and describe the computer programs and analysis techniques which are available for rocket nozzle and exhaust plume calculations. The basic method of characteristics program is discussed, along with such auxiliary programs as the plume impingement program, the plot program and the thermochemical properties program.

  19. 47 CFR 73.6001 - Eligibility and service requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Eligibility and service requirements. 73.6001..., 1999, operated their stations in a manner consistent with the programming and operational standards set... programming each quarter. (c) Licensed Class A television broadcast stations shall be accorded primary status...

  20. 47 CFR 73.6001 - Eligibility and service requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Eligibility and service requirements. 73.6001..., 1999, operated their stations in a manner consistent with the programming and operational standards set... programming each quarter. (c) Licensed Class A television broadcast stations shall be accorded primary status...

  1. 78 FR 24150 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... Nutrition Service Title: Supplemental Nutrition Assistance Program (SNAP) Employment and Training (E & T... that States' efforts are now focused on a particular segment of the Supplemental Nutrition Assistance... quarterly reports about their E&T Programs so that the Food and Nutrition Service (FNS) can monitor their...

  2. Gifted Education Press Quarterly. Volume 10, 1996.

    ERIC Educational Resources Information Center

    Gifted Education Press Quarterly, 1996

    1996-01-01

    This set of four newsletters discusses current issues in gifted education. The first issue includes: "The Underserved Young Gifted Child: Status of Programs and Research" (Joan Smutny); "The Home Education Model: An Alternative Program for the Gifted" (Karen Kendig) and "Jonathan Swift (1667-1745): A Need for Gifted…

  3. 2012 statistical summaries : FTA grant assistance programs.

    DOT National Transportation Integrated Search

    2013-12-01

    The 2012 Statistical Summaries provides information about the Federal Transit Administrations (FTA) major financial aid programs for : Federal Fiscal Year (FY) 2012. The report covers the following programs: Urbanized Area Formula, Non-urbanized A...

  4. 2011 statistical summaries : FTA grant assistance programs.

    DOT National Transportation Integrated Search

    2013-05-01

    The 2011 Statistical Summaries provides information about the Federal Transit Administrations (FTA) major financial aid programs for Federal Fiscal Year (FY) 2011. The report covers the following programs: Urbanized Area Formula, Non-urbanized Are...

  5. 2010 statistical summaries : FTA grant assistance programs.

    DOT National Transportation Integrated Search

    2013-07-01

    The 2010 Statistical Summaries provides information about the Federal Transit Administrations (FTA) major financial aid programs for Federal Fiscal Year (FY) 2010. The report covers the following programs: Urbanized Area Formula, Non-urbanized Are...

  6. USEPA Arsenic Demonstration Program

    EPA Science Inventory

    The presentation provides background information on the USEPA arsenic removal program. The summary includes information on the history of the program, sites and technology selected, and a summary of the data collected from two completed projects.

  7. 12 CFR 1806.101 - Summary.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Summary. 1806.101 Section 1806.101 Banks and Banking COMMUNITY DEVELOPMENT FINANCIAL INSTITUTIONS FUND, DEPARTMENT OF THE TREASURY BANK ENTERPRISE AWARD PROGRAM General Provisions § 1806.101 Summary. (a) Under the Bank Enterprise Award Program, the...

  8. 1998 statistical summaries : Federal Transit Administration : grant assistance programs

    DOT National Transportation Integrated Search

    1999-03-01

    The 1998 Statistical Summaries provides information about the Federal Transit Administration's (FTA) major financial aid programs for Federal Fiscal Year (FY) 1998. The report covers the following programs: Urbanized Area Formula, Non-urbanized Area ...

  9. Evaluation of an automated milk leukocyte differential test and the California Mastitis Test for detecting intramammary infection in early- and late-lactation quarters and cows.

    PubMed

    Godden, S M; Royster, E; Timmerman, J; Rapnicki, P; Green, H

    2017-08-01

    Study objectives were to (1) describe the diagnostic test characteristics of an automated milk leukocyte differential (MLD) test and the California Mastitis Test (CMT) to identify intramammary infection (IMI) in early- (EL) and late-lactation (LL) quarters and cows when using 3 different approaches to define IMI from milk culture, and (2) describe the repeatability of MLD test results at both the quarter and cow level. Eighty-six EL and 90 LL Holstein cows were sampled from 3 Midwest herds. Quarter milk samples were collected for a cow-side CMT test, milk culture, and MLD testing. Quarter IMI status was defined by 3 methods: culture of a single milk sample, culture of duplicate samples with parallel interpretation, and culture of duplicate samples with serial interpretation. The MLD testing was completed in duplicate within 8 h of sample collection; MLD results (positive/negative) were reported at each possible threshold setting (1-18 for EL; 1-12 for LL) and CMT results (positive/negative) were reported at each possible cut-points (trace, ≥1, ≥2, or 3). We created 2 × 2 tables to compare MLD and CMT results to milk culture, at both the quarter and cow level, when using each of 3 different definitions of IMI as the referent test. Paired MLD test results were compared with evaluate repeatability. The MLD test showed excellent repeatability. The choice of definition of IMI from milk culture had minor effects on estimates of MLD and CMT test characteristics. For EL samples, when interpreting MLD and CMT results at the quarter level, and regardless of the referent test used, both tests had low sensitivity (MLD = 11.7-39.1%; CMT = 0-52.2%) but good to very good specificity (MLD = 82.1-95.2%; CMT = 68.1-100%), depending on the cut-point used. Sensitivity improved slightly if diagnosis was interpreted at the cow level (MLD = 25.6-56.4%; CMT = 0-72.2%), though specificity generally declined (MLD = 61.8-100%; CMT = 25.0-100%) depending on the cut-point used. For LL samples, when interpreted at the quarter level, both tests had variable sensitivity (MLD = 46.6-84.8%; CMT = 9.6-72.7%) and variable specificity (MLD = 59.2-79.8%; CMT = 52.5-97.3%), depending on the cut-point used. Test sensitivity improved if interpreted at the cow level (MLD = 59.6-86.4%; CMT = 19.1-86.4%), though specificity declined (MLD = 32.4-56.8%; CMT = 14.3-92.3%). Producers considering adopting either test for LL or EL screening programs will need to carefully consider the goals and priorities of the program (e.g., whether to prioritize test sensitivity or specificity) when deciding on the level of interpretation (quarter or cow) and when selecting the optimal cut-point for interpreting test results. Additional validation studies and large randomized field studies will be needed to evaluate the effect of adopting either test in selective dry cow therapy or fresh cow screening programs on udder health, antibiotic use, and economics. The Authors. Published by the Federation of Animal Science Societies and Elsevier Inc. on behalf of the American Dairy Science Association®. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/3.0/).

  10. Success for All®. What Works Clearinghouse Intervention Report. Updated

    ERIC Educational Resources Information Center

    What Works Clearinghouse, 2017

    2017-01-01

    "Success for All" ("SFA"®) is a whole-school reform model (that is, a model that integrates curriculum, school culture, family, and community supports) for students in prekindergarten through grade 8. "SFA"® includes a literacy program, quarterly assessments of student learning, a social-emotional development program,…

  11. Middle School Advisement.

    ERIC Educational Resources Information Center

    Ball, Tricia

    Designed for those teaching an advisement program to middle school students, this book provides a year-long program with suggestions for many activities geared to middle school students. The text is divided into the traditional four-quarter school year but can be adapted to any school year configuration. The activities are designed so that the…

  12. 75 FR 18889 - Notice of Quarterly Report (October 1, 2009-December 31, 2009)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ... 17,583,512 Control, Monitoring and Evaluation. Pending subsequent reports**..... 1,368,813 * Program... irrigation. Number of beneficial biological control agents developed for use by program farmers or other.... Percent of contracted road works disbursed-- rural roads. Signed contracts for feasibility and/or design...

  13. 76 FR 17870 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-October Through December 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-31

    ... Registry (NOPR) Sites. Addendum XIII: Medicare-approved Ventricular Assist Device (Destination Therapy... Therapy) Facilities (October Through December 2010) On October 1, 2003, we issued our decision memorandum on ventricular assist devices (VADs) for the clinical indication of destination therapy. We...

  14. 78 FR 45441 - Sugar Program; Feedstock Flexibility Program for Bioenergy Producers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-29

    ... sugarcane processors may borrow from CCC, pledging their sugar production as collateral for any such loan... sugar for bioenergy production under FFP as a proactive means for CCC to avoid forfeitures. FFP is... production. In addition, CCC will make quarterly announcements of revised estimates of such quantity. CCC's...

  15. Exploring the Potential of In-Service Training through Distance Education.

    ERIC Educational Resources Information Center

    Kelsey, Timothy W.; Mincemoyer, Claudia C.

    2001-01-01

    Survey responses from 228 Pennsylvania extension staff revealed time- or travel-related reasons inhibited inservice participation. They preferred regional locations over any other, though they were receptive to having some inservice programs delivered using distance education technologies. A pilot test of quarterly satellite inservice programs was…

  16. Dispositional Factors Affecting Motivation during Learning in Adult Basic and Secondary Education Programs

    ERIC Educational Resources Information Center

    Mellard, Daryl F.; Krieshok, Thomas; Fall, Emily; Woods, Kari

    2013-01-01

    Research indicates that about a quarter of adult students separate from formal adult basic and secondary education (ABE/ASE) programs before completing one educational level. This retrospective study explores individual dispositional factors that affect motivation during learning, particularly students' goals, goal-directed thinking and action…

  17. 14 CFR 91.1417 - CAMP: Mechanical interruption summary report.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false CAMP: Mechanical interruption summary... Ownership Operations Program Management § 91.1417 CAMP: Mechanical interruption summary report. Each program... route, caused by known or suspected mechanical difficulties or malfunctions that are not required to be...

  18. Financial Management: Education's Student Loan Program Controls over Lenders Need Improvement. Report to the Secretary of Education.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC.

    This report presents the results of a U.S. General Accounting Office (GAO) review of lender and Department of Education controls over the accuracy of lender-submitted quarterly billings under the Federal Family Education Loan Program, also known as the guaranteed student loan program. It reports that both lenders and the Department of Education…

  19. A Summative Evaluation of a Middle School Summer Math Program

    ERIC Educational Resources Information Center

    Nelson, Brian W.

    2014-01-01

    By some estimates, students lose an average of 2.6 months of learning during summer break, roughly one quarter of the time spent in school. To combat this problem, the school under study implemented a summer math program that was thematically linked to the Boston Red Sox baseball team. Hundreds of students have participated in the program, but the…

  20. Academic Year Abroad, 1994/95. The Most Complete Guide to Planning Academic Year Study Abroad.

    ERIC Educational Resources Information Center

    Steen, Sara J., Ed.

    This book describes over 2,100 academic programs (at least one academic quarter in length) sponsored by accredited U.S. postsecondary institutions or developed for U.S. students by foreign universities and other organizations. Entries are based on a 1993 survey. While most programs listed are available to undergraduates, many programs are also…

  1. KEEP Reading Research and Instruction: Results of the 1973-74 Program. Technical Report No. 26.

    ERIC Educational Resources Information Center

    Au, Kathryn H.; Speidel, Gisela E.

    This report summarizes research related to the use of a conventional basal reading program with students in the Kamehameha Early Education Program (KEEP). Results of instruction were measured by the number of objectives gained each quarter, the total number of objectives gained, the number of lessons taken for each objective, and scores on the…

  2. Subsystems component definitions summary program

    NASA Technical Reports Server (NTRS)

    Scott, A. Don; Thomas, Carolyn C.; Simonsen, Lisa C.; Hall, John B., Jr.

    1991-01-01

    A computer program, the Subsystems Component Definitions Summary (SUBCOMDEF), was developed to provide a quick and efficient means of summarizing large quantities of subsystems component data in terms of weight, volume, resupply, and power. The program was validated using Space Station Freedom Program Definition Requirements Document data for the internal and external thermal control subsystem. Once all component descriptions, unit weights and volumes, resupply, and power data are input, the user may obtain a summary report of user-specified portions of the subsystem or of the entire subsystem as a whole. Any combination or all of the parameters of wet and dry weight, wet and dry volume, resupply weight and volume, and power may be displayed. The user may vary the resupply period according to individual mission requirements, as well as the number of hours per day power consuming components operate. Uses of this program are not limited only to subsystem component summaries. Any applications that require quick, efficient, and accurate weight, volume, resupply, or power summaries would be well suited to take advantage of SUBCOMDEF's capabilities.

  3. USAF Hearing Conservation Program, DOEHRS-HC Data Repository Annual Report: CY15

    DTIC Science & Technology

    2017-05-31

    AFRL-SA-WP-SR-2017-0014 USAF Hearing Conservation Program, DOEHRS-HC Data Repository Annual Report: CY15 Daniel A. Williams...Conservation Program, DOEHRS-HC Data Repository Annual Report: CY15 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR...Health Readiness System-Hearing Conservation Data Repository (DOEHRS-HC DR). Major command- and installation-level reports are available quarterly

  4. Validity of the FACT-H&N (v 4.0) among Malaysian oral cancer patients.

    PubMed

    Doss, J G; Thomson, W M; Drummond, B K; Raja Latifah, R J

    2011-07-01

    To assess the cross-sectional construct validity of the Malay-translated and cross-culturally adapted FACT-H&N (v 4.0) for discriminative use in a sample of Malaysian oral cancer patients. A cross-sectional study of adults newly diagnosed with oral cancer. HRQOL data were collected using the FACT-H&N (v 4.0), a global question and a supplementary set of eight questions ('MAQ') obtained earlier in pilot work. Of the 76 participants (61.8% female; 23.7% younger than 50), most (96.1%) had oral squamous cell carcinoma; two-thirds were in Stages III or IV. At baseline, patients' mean FACT summary (FACT-G, FACT-H&N, FACT-H&N TOI, and FHNSI) and subscale (pwb, swb, ewb, fwb, and hnsc) scores were towards the higher end of the range. Equal proportions (36.8%) rated their overall HRQOL as 'good' or 'average'; fewer than one-quarter rated it as 'poor', and only two as 'very good'. All six FACT summary and most subscales had moderate-to-good internal consistency. For all summary scales, those with 'very poor/poor' self-rated HRQOL differed significantly from the 'good/very good' group. All FACT summary scales correlated strongly (r>0.75). Summary scales showed convergent validity (r>0.90) but little discriminant validity. The discriminant validity of the FHNSI improved with the addition of the MAQ. The FACT-H&N summary scales and most subscales demonstrated acceptable cross-sectional construct validity, reliability and discriminative ability, and thus appear appropriate for further use among Malaysian oral cancer patients. Copyright © 2011 Elsevier Ltd. All rights reserved.

  5. Reading Recovery Executive Summary, 1984 to 1998.

    ERIC Educational Resources Information Center

    Reading Recovery Council of North America, Columbus, OH.

    This Executive Summary provides information and details about Reading Recovery, an early intervention program for young readers who are experiencing difficulty in their first year of reading instruction. The summary first explains that Reading Recovery is a one-to-one tutoring program designed to serve the lowest achieving readers in which…

  6. The Structure and Dynamics of the Solar Corona and Inner Heliosphere

    NASA Technical Reports Server (NTRS)

    Mikic, Zoran; Grebowsky, J. (Technical Monitor)

    2001-01-01

    This report covers technical progress during the third quarter of the second year of NASA Sun-Earth Connections Theory Program (SECTP) contract 'The Structure and Dynamics of the Solar Corona and Inner Heliosphere,' NAS5-99188, between NASA and Science Applications International Corporation, and covers the period February 16, 2001 to May 15, 2001. Under this contract SAIC and the University of California, Irvine (UCI) have conducted research into theoretical modeling of active regions, the solar corona, and the inner heliosphere, using the MHD model.In this report we summarize the accomplishments made by our group during the first seven quarters of our Sun-Earth Connection Theory Program contract. The descriptions are intended to illustrate our principal results. A full account can be found in the referenced publications.

  7. Service and methods demonstration program annual report - executive summary.

    DOT National Transportation Integrated Search

    1979-08-01

    This report contains a summary of the contents of the Service and Methods Demonstration Program Annual Report for Fiscal Year 1978. Program activities and accomplishments discussed in the Annual Report are reviewed including findings and insights fro...

  8. Summary of the STIS Cycle 19 Calibration Program

    NASA Astrophysics Data System (ADS)

    Roman-Duval, Julia; Ely, Justin; Aloisi, Alessandra; Oliveira, Cristina; Proffitt, Charles; Hernandez, Svea; Mason, Elena; Sonnetrucker, Paule; Wolfe, Michael; Long, Chris; DiFelice, Audrey; Bostroem, Azalee K.; Holland, Stephen; Lockwood, Sean; Cox, Colin; Wheeler, Thomas

    2014-11-01

    We summarize the Cycle 19 calibration program for the Space Telescope Imaging Spectrograph (STIS) on the Hubble Space Telescope, covering the time period November 2011 through October 2012. We give an overview of the whole program, and status summaries for each of the individual proposals comprising the program.

  9. Summaries of FY 1993 Engineering Research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    This report documents the BES Engineering Research Program for fiscal year 1993; it provides a summary for each of the program projects in addition to a brief program overview. The report is intended to provide staff of Congressional committees, other executive departments, and other DOE offices with substantive program information so as to facilitate governmental overview and coordination of Federal research programs. Of equal importance, its availability facilitates communication of program information to interested research engineers and scientists. The organizational chart for the DOE Office of Energy Research (OER) on the next page delineates the six Divisions within the OERmore » Office of Basic Energy Sciences (BES). Each BES Division administers basic, mission oriented research programs in the area indicated by its title. The BES Engineering Research Program is one such program; it is administered by the Engineering and Geosciences Division of BES. In preparing this report we asked the principal investigators to submit summaries for their projects that were specifically applicable to fiscal year 1993. The summaries received have been edited if necessary.« less

  10. Overview of shorthand medical glossary (OMG) study.

    PubMed

    Politis, J; Lau, S; Yeoh, J; Brand, C; Russell, D; Liew, D

    2015-04-01

    Shorthand is commonplace in clinical notation. While many abbreviations are standard and widely accepted, an increasing number are non-standard and/or unrecognisable. We sought to describe the frequency of inappropriate and ambiguous shorthand in discharge summaries. Eighty electronic discharge summaries from the four General Medical Units at the Royal Melbourne Hospital were randomly extracted from the hospital's electronic records. Extraction was stratified by the four units and by the four quarters between July 2012 and June 2013. All abbreviations were assigned into one of four categories according to appropriateness: 1. 'Universally accepted and understood even without context'; 2. 'Understood when in context'; 3. 'Understood but inappropriate and/or ambiguous'; and 4. 'Unknown'. These categories were determined by the authors, which included junior and senior medical staff. The 80 discharge summaries contained 840 different abbreviations used on 6269 occasions. Of all words, 20.1% were abbreviations. Of the 6269 occasions of shorthand, 6.8% were categorised as 'Understood but inappropriate and/or ambiguous' or 'Unknown' (category 3 or 4), equating to 1.4% of all words, and an average of 5.4 words per discharge summary. Abbreviations are common in electronic discharge summaries, occurring at a frequency of one in five words. While the majority of shorthand used seems to be appropriate, the use of inappropriate, ambiguous or unknown shorthand is still frequent. This has implications for safe and effective patient care and highlights the need for better awareness and education regarding use of shorthand in clinical notation. © 2015 Royal Australasian College of Physicians.

  11. Association between Traditional Nursing Home Quality Measures and Two Sources of Nursing Home Complaints

    PubMed Central

    Troyer, Jennifer L; Sause, Wendy

    2013-01-01

    Objective To test for an association between traditional nursing home quality measures and two sources of resident- and caregiver-derived nursing home complaints. Data Sources Nursing home complaints to the North Carolina Long-Term Care Ombudsman Program and state certification agency from October 2002 through September 2006 were matched with Online Survey Certification and Reporting data and Minimum Data Set Quality Indicators (MDS-QIs). Study Design We examine the association between the number of complaints filed against a facility and measures of inspection violations, staffing levels, and MDS-QIs. Data Extraction One observation per facility per quarter is constructed by matching quarterly data on complaints to OSCAR data from the same or most recent prior quarter and to MDS-QIs from the same quarter. One observation per inspection is obtained by matching OSCAR data to complaint totals from both the same and the immediate prior quarter. Principal Findings There is little relationship between MDS-QIs and complaints. Ombudsman complaints and inspection violations are generally unrelated, but there is a positive relationship between state certification agency complaints and inspection violations. Conclusions Ombudsman and state certification agency complaint data are resident- and caregiver-derived quality measures that are distinctive from and complement traditional quality measures. PMID:23216541

  12. Gas turbine engines and transmissions for bus demonstration programs. Technical status report, 30 April 1979-31 July 1979

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nigro, D.N.

    1979-07-01

    The quarterly status report covers the period from 30 April 1979 through 31 July 1979 and is a summary of DDA activities for the effort performed on the procurement and delivery of eleven (11) Allison GT 404-4 gas turbine engines and five (5) HT740CT and six (6) V730CT Allison automatic transmissions and the required associated software. The contract requires the delivery of eleven (11) Allison GT 404-4 Industrial Gas Turbine Engines and five (5) HT740CT and six (6) V730CT Allison Automatic Transmissions for the Greyhound and Transit Coaches, respectively. In addition, software items such as cost reports, technical reports, installationmore » drawings, acceptance test data and parts lists are required. A recent decision by the DOE will modify the build configuration for the last four (4) Transit Coach engines. It was decided by the DOE at a meeting in Washington, DC on March 28, 1979 with representatives from DDA, NASA/LeRC, JPL and Booz-Allen and Hamilton that these engines will be built with ceramic regenerators. (TFD)« less

  13. RECOMMENDATIONS FOR UO3 PLANT BIOASSAY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carbaugh, Eugene H.

    2010-07-12

    Alternative urine bioassay programs are described for application with decontamination and decommissioning activities at the Hanford UO3 Plant. The alternatives are based on quarterly or monthly urine bioassay for recycled uranium, assuming multiple acute inhalation intakes of recycled uranium occurring over a year. The inhalations are assumed to be 5µm AMAD particles of 80% absorption type F and 20% absorption type M. Screening levels, expressed as daily uranium mass excretion rates in urine, and the actions associated with these levels are provided for both quarterly and monthly sampling frequencies.

  14. Next Generation Transport Phenomenology Model

    NASA Technical Reports Server (NTRS)

    Strickland, Douglas J.; Knight, Harold; Evans, J. Scott

    2004-01-01

    This report describes the progress made in Quarter 3 of Contract Year 3 on the development of Aeronomy Phenomenology Modeling Tool (APMT), an open-source, component-based, client-server architecture for distributed modeling, analysis, and simulation activities focused on electron and photon transport for general atmospheres. In the past quarter, column emission rate computations were implemented in Java, preexisting Fortran programs for computing synthetic spectra were embedded into APMT through Java wrappers, and work began on a web-based user interface for setting input parameters and running the photoelectron and auroral electron transport models.

  15. The Neurological Basis and Potential Modification of Emotional Intelligence through Affective/Behavioral Training

    DTIC Science & Technology

    2010-10-01

    facial trustworthiness; facial displays of anger) presented subliminally . Furthermore, the responsiveness of these regions to subliminal stimulation ...develop, or program the computerized stimulation paradigms for use during functional neuroimaging (i.e., MJT; BMAT; EFAT). These paradigms will be...programming began on the computerized functional MRI stimulation paradigms using e-prime software. • Quarter #2: Programming of all computerized functional

  16. Structuring a risk-based bioassay program for uranium usage in university laboratories

    NASA Astrophysics Data System (ADS)

    Dawson, Johnne Talia

    Bioassay programs are integral in a radiation safety program. They are used as a method of determining whether individuals working with radioactive material have been exposed and have received a resulting dose. For radionuclides that are not found in nature, determining an exposure is straightforward. However, for a naturally occurring radionuclide like uranium, it is not as straightforward to determine whether a dose is the result of an occupational exposure. The purpose of this project is to address this issue within the University of Nevada, Las Vegas's (UNLV) bioassay program. This project consisted of two components that studied the effectiveness of a bioassay program in determining the dose for an acute inhalation of uranium. The first component of the plan addresses the creation of excretion curves, utilizing MATLAB that would allow UNLV to be able to determine at what time an inhalation dose can be attributed to. The excretion curves were based on the ICRP 30 lung model, as well as the Annual Limit Intake (ALI) values located in the Nuclear Regulatory Commission's 10CFR20 which is based on ICRP 30 (International Commission on Radiological Protection). The excretion curves would allow UNLV to be able to conduct in-house investigations of inhalation doses without solely depending on outside investigations and sources. The second component of the project focused on the creation of a risk based bioassay program to be utilized by UNLV that would take into account bioassay frequency that depended on the individual. Determining the risk based bioassay program required the use of baseline variance in order to minimize the investigation of false positives among those individuals who undergo bioassays for uranium work. The proposed program was compared against an evaluation limit of 10 mrem per quarter, an investigational limit of 125 mrem per quarter, and the federal/state requirement of 1.25 rem per quarter. It was determined that a bioassay program whose bioassay frequency varies per person, depending on the chemical class of material being worked with, in conjunction with continuous air monitoring can sufficiently meet ALARA standards.

  17. Resource Use and Medicare Costs During Lay Navigation for Geriatric Patients With Cancer.

    PubMed

    Rocque, Gabrielle B; Pisu, Maria; Jackson, Bradford E; Kvale, Elizabeth A; Demark-Wahnefried, Wendy; Martin, Michelle Y; Meneses, Karen; Li, Yufeng; Taylor, Richard A; Acemgil, Aras; Williams, Courtney P; Lisovicz, Nedra; Fouad, Mona; Kenzik, Kelly M; Partridge, Edward E

    2017-06-01

    Lay navigators in the Patient Care Connect Program support patients with cancer from diagnosis through survivorship to end of life. They empower patients to engage in their health care and navigate them through the increasingly complex health care system. Navigation programs can improve access to care, enhance coordination of care, and overcome barriers to timely, high-quality health care. However, few data exist regarding the financial implications of implementing a lay navigation program. To examine the influence of lay navigation on health care spending and resource use among geriatric patients with cancer within The University of Alabama at Birmingham Health System Cancer Community Network. This observational study from January 1, 2012, through December 31, 2015, used propensity score-matched regression analysis to compare quarterly changes in the mean total Medicare costs and resource use between navigated patients and nonnavigated, matched comparison patients. The setting was The University of Alabama at Birmingham Health System Cancer Community Network, which includes 2 academic and 10 community cancer centers across Alabama, Georgia, Florida, Mississippi, and Tennessee. Participants were Medicare beneficiaries with cancer who received care at participating institutions from 2012 through 2015. The primary exposure was contact with a patient navigator. Navigated patients were matched to nonnavigated patients on age, race, sex, cancer acuity (high vs low), comorbidity score, and preenrollment characteristics (costs, emergency department visits, hospitalizations, intensive care unit admissions, and chemotherapy in the preenrollment quarter). Total costs to Medicare, components of cost, and resource use (emergency department visits, hospitalizations, and intensive care unit admissions). In total, 12 428 patients (mean (SD) age at cancer diagnosis, 75 (7) years; 52.0% female) were propensity score matched, including 6214 patients in the navigated group and 6214 patients in the matched nonnavigated comparison group. Compared with the matched comparison group, the mean total costs declined by $781.29 more per quarter per navigated patient (β = -781.29, SE = 45.77, P < .001), for an estimated $19 million decline per year across the network. Inpatient and outpatient costs had the largest between-group quarterly declines, at $294 and $275, respectively, per patient. Emergency department visits, hospitalizations, and intensive care unit admissions decreased by 6.0%, 7.9%, and 10.6%, respectively, per quarter in navigated patients compared with matched comparison patients (P < .001). Costs to Medicare and health care use from 2012 through 2015 declined significantly for navigated patients compared with matched comparison patients. Lay navigation programs should be expanded as health systems transition to value-based health care.

  18. Biological and Chemical Technologies Research at OIT: Annual Summary Report, FY 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, G.

    1998-03-01

    The annual summary report presents the fiscal year (FY) 1 997 research activities and accomplishments for the United States Department of Energy (DOE) Biological and Chemical Technologies Research (BCTR) Program. This BCTR program resides within the Office of Industrial Technologies (OIT) of the Office of Energy Efficiency and Renewable Energy (EE). The annual summary report for 1997 (ASR 97) contains the following: program description (including BCTR program mission statement, historical background, relevance, goals and objectives); program structure and organization; selected technical and programmatic highlights for 1 997; detailed descriptions of individual projects; and a listing of program output, including amore » bibliography of published work, patents, and awards arising from work supported by the program.« less

  19. 76 FR 2346 - Quarterly Update to Annual Listing of Foreign Government Subsidies on Articles of Cheese Subject...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-13

    ... DUTY Gross \\1\\ Subsidy Net \\2\\ Subsidy Country Program(s) ($/lb) ($/lb) 27 European Union Member States \\3\\........ European Union Restitution... $0.00 $0.00 Payments Canada Export Assistance on......... 0... states of the European Union are: Austria, Belgium, Bulgaria, Cyprus, Czech Republic, Denmark, Estonia...

  20. 12 CFR Appendix A to Subpart B of... - Risk-Based Capital Stress Test

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Loan Number Ending Scheduled Balance Group Pre/Post Act Property State Product Type Origination Date... program assets post-1996 Act Swap balances; (iii) Farmer Mac I program assets pre-1996 Act; (iv) Farmer... stress test applies quarterly updates of the weighted average guarantee rates for post-1996 Farmer Mac I...

  1. 12 CFR Appendix A to Subpart B of... - Risk-Based Capital Stress Test

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Loan Number Ending Scheduled Balance Group Pre/Post Act Property State Product Type Origination Date... program assets post-1996 Act Swap balances; (iii) Farmer Mac I program assets pre-1996 Act; (iv) Farmer... stress test applies quarterly updates of the weighted average guarantee rates for post-1996 Farmer Mac I...

  2. 75 FR 14905 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-October Through December 2009

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ... stent facilities. Included in this notice is a list of the American College of Cardiology's National... 21244-1850, or you can call (410) 786-6962. Questions concerning Medicare-approved carotid stent... 20 of the CFR. Addendum VIII includes listings of Medicare-approved carotid stent facilities. All...

  3. 75 FR 58789 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-April Through June 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ...- approved carotid stent facilities. Included in this notice is a list of the American College of Cardiology... 21244-1850, or you can call (410) 786-6962. Questions concerning Medicare-approved carotid stent... listings of Medicare-approved carotid stent facilities. All facilities listed meet CMS standards for...

  4. 75 FR 79173 - Medicare and Medicaid Programs; Quarterly Listing of Program Issuances-July Through September 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... collections of information in CMS regulations and a list of Medicare- approved carotid stent facilities.... Questions concerning Medicare-approved carotid stent facilities in Addendum VIII may be addressed to Sarah J... 20 of the CFR. Addendum VIII includes listings of Medicare-approved carotid stent facilities. All...

  5. 40 CFR 86.1920 - What in-use testing information must I report to EPA?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Manufacturer-Run In-Use Testing Program for Heavy-Duty Diesel Engines § 86.1920 What in-use testing information... engine for which testing was completed during the calendar quarter. Alternatively, you may separately...

  6. 40 CFR 86.1920 - What in-use testing information must I report to EPA?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES (CONTINUED) Manufacturer-Run In-Use Testing Program for Heavy-Duty Diesel Engines § 86.1920 What in-use... data from each engine for which testing was completed during the calendar quarter. Alternatively, you...

  7. 40 CFR 86.1920 - What in-use testing information must I report to EPA?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES (CONTINUED) Manufacturer-Run In-Use Testing Program for Heavy-Duty Diesel Engines § 86.1920 What in-use... data from each engine for which testing was completed during the calendar quarter. Alternatively, you...

  8. 76 FR 78675 - Notice of Regulatory Waiver Requests Granted for the Third Quarter of Calendar Year 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ... county to maintain capacity to administer its CDBG program until December 31, 2011. Contact: Steve... to affected local governments in a timely manner. Contact: Steve Rhodeside, Acting Director, State... administer its CDBG program until December 31, 2011. Contact: Steve Johnson, Office of Block Grant Assistance...

  9. Measuring How Benchmark Assessments Affect Student Achievement. Issues & Answers. REL 2007-No. 039

    ERIC Educational Resources Information Center

    Henderson, Susan; Petrosino, Anthony; Guckenburg, Sarah; Hamilton, Stephen

    2007-01-01

    This report examines a Massachusetts pilot program for quarterly benchmark exams in middle-school mathematics, finding that program schools do not show greater gains in student achievement after a year. But that finding might reflect limited data rather than ineffective benchmark assessments. Benchmark assessments are used in many districts…

  10. Advancing Vocational Education Through Research and Development.

    ERIC Educational Resources Information Center

    Bureau of Occupational and Adult Education (DHEW/OE), Washington, DC. Div. of Research and Demonstration.

    This report contains information about the legislative and regulatory framework for Section 131 (a) of part C of the U.S. Commissioner of Education's Vocational Education Research Programs; the planning and its procedures leading to the determination of the program priority areas for fiscal year 1976 and the transition quarter; the processes used…

  11. Infants and Toddlers, 2001-2002.

    ERIC Educational Resources Information Center

    Kroenke, Lillian DeVault, Ed.

    2002-01-01

    This document is comprised of the 2001-2002 issues of a quarterly journal for teachers and parents of children in Montessori infant and toddler programs. The spring 2001 issue presents articles on the history of infant and toddler programs in Italy and how to fulfill infant needs in Montessori child care, and on learning activities in the kitchen…

  12. Course Outline Workshop III: Paraprofessional Training.

    ERIC Educational Resources Information Center

    Burron, Arni, Comp.; Santopietro, Kathy, Comp.

    The materials in this teaching guide represent the third quarter of a community college program designed to teach paraprofessionals how to tutor in an adult literacy program. Techniques for teaching reading and English as a second language are included. Lesson plans for five classes cover the informal reading inventory, review and practice in the…

  13. NC Families and Communities Equals Success (FACES): Six Months Later.

    ERIC Educational Resources Information Center

    Fernandez, Maria E.; Campbell, Kimm; Honess, Karen; Gallagher, Natalie Gibbs; Thurber, Lori; Smitley, Andy

    This paper reports on clinical and school outcomes after 6 months of implementing the North Carolina FACES (Families and Communities Equals Success) mental health program. Of the 210 children and youth participating in the program evaluation, 42 percent were African American, more than three quarters were male, 55 percent of families had annual…

  14. Kansas State University DOE/KEURP Site Operator User Task Force. Year 3, Fourth quarterly report, April 1--June 30, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hague, J.

    This program relates to demonstration use of electric-powered vehicles. KSU has two electric cars (conversion vehicles) from Soleq. Corp., and is purchasing 4 Chevy trucks for conversion. This document discusses the participating groups, program plan, events, vehicles and components, operations, and procurement.

  15. Space nuclear safety program

    NASA Astrophysics Data System (ADS)

    George, T. G.

    1990-02-01

    This quarterly report describes studies related to the use of Pu(238)O sub 2 in radioisotope power systems, carried out of the Office of Defense Energy Programs and Special Applications of the U.S. Department of Energy by Los Alamos National Laboratory. The studies are ongoing; the results and conclusions described may change as the work progresses.

  16. 40 CFR 86.1920 - What in-use testing information must I report to EPA?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES (CONTINUED) Manufacturer-Run In-Use Testing Program for Heavy-Duty Diesel Engines § 86.1920 What in-use... data from each engine for which testing was completed during the calendar quarter. Alternatively, you...

  17. Quarterly Program Progress Report April 1, 2002-June 30, 2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Palafox, Neal A., MD, MPH

    2002-07-31

    DOE B188 DOE/PHRI Special Medical Care Program in the Republic of the Marshall Islands (RMI)Quarterly Program Progress Report The DOE/PHRI Special Medical Care Program continues to provide, on a year round basis, a broad spectrum of medical care to the DOE patient population. During the fourth quarter of Year 4, the following medical services were provided: (1) Annual medical examinations for the DOE patient population (see Exhibit 1 for details). (2) Medications for the DOE patient population. (3) Preventive and primary medical care to the DOE patient population in the RMI as time and resources permit. (4) Additional manpower formore » the outpatient clinics at Ebeye and Majuro Hospitals (see Exhibit 2 for details). (5) Ancillary services such as labs, radiology and pharmacy in coordination with Kwajalein Hospital, Majuro Hospital and the 177 Health Care Program (177 HCP). (6) Referrals to Ebeye Hospital, Majuro Hospital and Kwajalein Hospital as necessary. (7) Referrals to Straub Clinic and Hospital in Honolulu as necessary (for details see Exhibit 1). (8) Monitored and adjusted monthly annual examination schedules based on equipment failure at Kwajalein. In addition to the above, the program was also involved in the following activities during this quarter: (1) Organized and conducted continuing medical education (CME) talks for the program's RMI staff and other RMI healthcare workers. (2) Held meetings with RMI government officials and Local Atoll government officials. (3) Input past medical records into the Electronic Medical Record (EMR) system. (4) Made adjustments to and created more templates for the EMR system. (5) Coordinated with the Public Health Departments on Majuro and Ebeye. (6) Met with PEACESAT to discuss possible collaboration on high speed Internet access. (7) Looked for opportunities to expand the program's telehealth capabilities. (8) Participated in the DOE-RMI Meeting in Honolulu. (9) Finalized the agreement with the RMI Ministry of Health and Environment (MOHE) and Majuro Hospital to hire Dr. Marie Lanwi on a part-time basis. (10) Held a Community Advisory Group (CAG) Meeting and Community Meeting on Majuro. (11) Negotiated with Kwajalein with regards to the increase in laboratory and procedure costs and continuing Mammography services for the DOE patient population. (12) Met with DOE in Honolulu to discuss the next year's program and budget. (13) Trained new residents in the use of the electronic medical record system. (14) Conducted electronic medical record audits. (15) Participated in a training session for the appointment scheduler module by Physician Micro System, Inc. on the EMR system. (16) Worked on the Year 5 Continuation Application and Budget. (17) Finalized the Memorandum of Understanding (MOU) with 177. (18) Worked with DOE and Bechtel Nevada (BN) to reduce PHRI program costs to meet an increase in referral costs paid by Bechtel. This report details the additions and changes to the program for the April 1, 2002-June 30, 2002 period.« less

  18. International Space Station USOS Crew Quarters Development

    NASA Technical Reports Server (NTRS)

    Broyan, James Lee, Jr.; Borrego, Melissa Ann; Bahr, Juergen F.

    2008-01-01

    The International Space Station (ISS) United States Operational Segment (USOS) currently provides a Temporary Sleep Station (TeSS) as crew quarters for one crewmember in the Laboratory Module. The Russian Segment provides permanent crew quarters (Kayutas) for two crewmembers in the Service Module. The TeSS provides limited electrical, communication, and ventilation functionality. A new permanent rack sized USOS ISS Crew Quarters (CQ) is being developed. Up to four CQs can be installed into the Node 2 element to increase the ISS crewmember size to six. The new CQs will provide private crewmember space with enhanced acoustic noise mitigation, integrated radiation reduction material, controllable airflow, communication equipment, redundant electrical systems, and redundant caution and warning systems. The rack sized CQ is a system with multiple crewmember restraints, adjustable lighting, controllable ventilation, and interfaces that allow each crewmember to personalize their CQ workspace. Providing an acoustically quiet and visually isolated environment, while ensuring crewmember safety, is critical for obtaining crewmember rest and comfort to enable long term crewmember performance. The numerous human factor, engineering, and program considerations during the concept, design, and prototyping are outlined in the paper.

  19. Low cost hydrogen/novel membrane technology for hydrogen separation from synthesis gas, Phase 1. Quarterly technical progress report for the period ending March 31, 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-12-31

    The goal of this program is to develop polymer membranes useful in the preparation of hydrogen from coal-derived synthesis gas. During this quarter the first experiment were aimed at developing high performance composite membranes for the separation of hydrogen from nitrogen and carbon monoxide. Three polymers have been selected as materials for these membranes: polyetherimide cellulose acetate and ethylcellulose. This quarter the investigators worked on polyetherimide and cellulose acetate membranes. The overall structure of these membranes is shown schematically in Figure 1. As shown, a microporous support membrane is first coated with a high flux intermediate layer then with anmore » ultrathin permselective layer and finally, if necessary, a thin protective high flux layer. 1 fig., 4 tabs.« less

  20. Intern Programs

    Science.gov Websites

    , engineering and computing. Working with Fermilab scientists or engineers, interns have an opportunity to four quarters at Fermilab, alternating periods of full-time study at their schools with full-time

  1. Final safety analysis report for the Ground Test Accelerator (GTA), Phase 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-10-01

    This document is the second volume of a 3 volume safety analysis report on the Ground Test Accelerator (GTA). The GTA program at the Los Alamos National Laboratory (LANL) is the major element of the national Neutral Particle Beam (NPB) program, which is supported by the Strategic Defense Initiative Office (SDIO). A principal goal of the national NPB program is to assess the feasibility of using hydrogen and deuterium neutral particle beams outside the Earth`s atmosphere. The main effort of the NPB program at Los Alamos concentrates on developing the GTA. The GTA is classified as a low-hazard facility, exceptmore » for the cryogenic-cooling system, which is classified as a moderate-hazard facility. This volume consists of failure modes and effects analysis; accident analysis; operational safety requirements; quality assurance program; ES&H management program; environmental, safety, and health systems critical to safety; summary of waste-management program; environmental monitoring program; facility expansion, decontamination, and decommissioning; summary of emergency response plan; summary plan for employee training; summary plan for operating procedures; glossary; and appendices A and B.« less

  2. Summary for 1996 LTPP traffic data collection : annual summary.

    DOT National Transportation Integrated Search

    1997-06-01

    In 1996 the Research Unit continued to collect traffic data for the Long Term Pavement Performance Program, hereinafter referred to as the LTPP program. The LTPP program is essentially comprised of on-site computers that apply collected data to an al...

  3. Atmospheric Radiation Measurement program climate research facility operations quarterly report April 1 - June 30, 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2007-07-26

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and monthmore » for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter of FY 2007 for the Southern Great Plains (SGP) site is 2,074.8 hours (0.95 x 2,184 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,965.6 hours (0.90 x 2,184), and that for the Tropical Western Pacific (TWP) locale is 1,856.4 hours (0.85 x 2,184). The OPSMAX time for the ARM Mobile Facility (AMF) is 2,074.8 hours (0.95 x 2,184). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percent of data in the Archive represents the average percent of the time (24 hours per day, 91 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), the actual hours of operation, and the variance (unplanned downtime) for the period April 1 through June 30, 2007, for the fixed sites only. The AMF has been deployed to Germany and is operational this quarter. The third quarter comprises a total of 2,184 hours. Although the average exceeded our goal this quarter, there were cash flow issues resulting from Continuing Resolution early in the period that did not allow for timely instrument repairs that kept our statistics lower than past quarters at all sites. The low NSA numbers resulted from missing MFRSR data this spring that appears to be recoverable but not available at the Archive at the time of this report.« less

  4. RDT quarterly : vol. 3, no. 3.

    DOT National Transportation Integrated Search

    2000-01-01

    The Missouri Transportation Bulletin is published by the Technology Transfer Assistance Program of the Missouri Department of Transportation, Jefferson City, Missouri. The opinions, findings or recommendations expressed in thisBulletin are not necess...

  5. RDT quarterly : vol. 3, no. 2.

    DOT National Transportation Integrated Search

    1999-01-01

    The Missouri Transportation Bulletin is published by the Technology Transfer Assistance Program of the Missouri Department of Transportation, : Jefferson City, Missouri. The opinions, findings or recommendations expressed in thisBulletin are not nece...

  6. Hydrogen Energy: A bibliography with abstracts

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Bibliographic series cites documents relating to use of hydrogen as energy carrier. In addition to cumulative volume, annual supplement is available for 1974, and quarterly update program serves 1975 and current calendar year.

  7. Homogeneous production and removal of NO/sub x/ from combustion exhaust gases. Fifth quarterly technical summary report, September 1-November 30, 1979

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silver, J.A.; Gozewski, C.M.; Kilb, C.E.

    1979-12-01

    The rate constant for the reaction of NH/sub 2/ + NO has been measured over the temperature range of 294 to 1200/sup 0/K. It exhibits a decrease in value with increasing temperatures. An upper limit to the rate of reaction of NH/sub 3/ + NO ..-->.. NH/sub 2/ + HNO is also reported. The hydroxyl radical has been identified as one of the products of the NH/sub 2/ + NO reaction, and the implications of this upon the modeling is discussed.

  8. Enhancements to and Applications with the "Unified" Long-Term PSC Database

    NASA Technical Reports Server (NTRS)

    Fromm, Michael; Alfred, Jerome

    2004-01-01

    This report summaries the project team's activity during the period 1 January - 31 March 2004. It consists of a project plan, which was completed during this period and an indication of the completion status of each phase of the project. The intention of the investigative team is to closely follow the statement of work documented in our proposal. For this reason, the proposal may be referenced in this and upcoming status reports. This project got underway in this quarter. Our activity was to formulate a project plan and to engage in planning meetings with collaborators.

  9. National Environmental/Energy Workforce Assessment, National Summary: Alabama-Indiana. Volume One.

    ERIC Educational Resources Information Center

    National Field Research Center Inc., Iowa City, IA.

    This report is one in a four-volume National Summary which presents existing workforce levels, training programs and career potentials for each of the states, Washington, D.C., Puerto Rico, and the Virgin Islands. Each individual state program summary is followed by a depiction of the current and projected (1976-1981) workforce figures for the…

  10. National Environmental/Energy Workforce Assessment, National Summary: Nevada-South Carolina. Volume Three.

    ERIC Educational Resources Information Center

    National Field Research Center Inc., Iowa City, IA.

    This report is one in a four-volume National Summary which presents existing workforce levels, training programs and career potentials for each of the states, Washington, D.C., Puerto Rico, and the Virgin Islands. Each individual state program summary is followed by a depiction of the current and projected (1976-1981) workforce figures for the…

  11. A Detailed Examination of the GPM Core Satellite Gridded Text Product

    NASA Technical Reports Server (NTRS)

    Stocker, Erich Franz; Kelley, Owen A.; Kummerow, C.; Huffman, George; Olson, William S.; Kwiatowski, John M.

    2015-01-01

    The Global Precipitation Measurement (GPM) mission quarter-degree gridded-text product has a similar file format and a similar purpose as the Tropical Rainfall Measuring Mission (TRMM) 3G68 quarter-degree product. The GPM text-grid format is an hourly summary of surface precipitation retrievals from various GPM instruments and combinations of GPM instruments. The GMI Goddard Profiling (GPROF) retrieval provides the widest swath (800 km) and does the retrieval using the GPM Microwave Imager (GMI). The Ku radar provides the widest radar swath (250 km swath) and also provides continuity with the TRMM Ku Precipitation Radar. GPM's Ku+Ka band matched swath (125 km swath) provides a dual-frequency precipitation retrieval. The "combined" retrieval (125 km swath) provides a multi-instrument precipitation retrieval based on the GMI, the DPR Ku radar, and the DPR Ka radar. While the data are reported in hourly grids, all hours for a day are packaged into a single text file that is g-zipped to reduce file size and to speed up downloading. The data are reported on a 0.25deg x 0.25 deg grid.

  12. Applied Meteorology Unit (AMU)

    NASA Technical Reports Server (NTRS)

    Bauman, William; Crawford, Winifred; Watson, Leela; Wheeler, Mark

    2011-01-01

    The AMU Team began four new tasks in this quarter: (1) began work to improve the AMU-developed tool that provides the launch weather officers information on peak wind speeds that helps them assess their launch commit criteria; (2) began updating lightning climatologies for airfields around central Florida. These climatologies help National Weather Service and Air Force forecasters determine the probability of lightning occurrence at these sites; (3) began a study for the 30th Weather Squadron at Vandenberg Air Force Base in California to determine if precursors can be found in weather observations to help the forecasters determine when they will get strong wind gusts in their northern towers; and (4) began work to update the AMU-developed severe weather tool with more data and possibly improve its performance using a new statistical technique. Include is a section of summaries and detail reporting on the quarterly tasks: (1) Peak Wind Tool for user Meteorological Interactive Data Display System (LCC), Phase IV, (2) Situational Lightning climatologies for Central Florida, Phase V, (3) Vandenberg AFB North Base Wind Study and (4) Upgrade Summer Severe Weather Tool Meteorological Interactive Data Display System (MIDDS).

  13. Atmospheric Radiation Measurement program climate research facility operations quarterly report July 1 - September 30, 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2008-10-08

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month formore » the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1 - September 30, 2008, for the fixed sites. The AMF has been deployed to China, but the data have not yet been released. The fourth quarter comprises a total of 2,208 hours. The average exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. HFE represents the AMF statistics for the Shouxian, China, deployment in 2008. FKB represents the AMF statistics for the Haselbach, Germany, past deployment in 2007. NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in 2006. PYE represents just the AMF Archive statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request a research account on the local site data system. The seven computers for the research accounts are located at the Barrow and Atqasuk sites; the SGP central facility; the TWP Manus, Nauru, and Darwin sites; and the DMF at PNNL. In addition, the ACRF serves as a data repository for a long-term Arctic atmospheric observatory in Eureka, Canada (80 degrees 05 minutes N, 86 degrees 43 minutes W) as part of the multiagency Study of Environmental Arctic Change (SEARCH) Program. NOAA began providing instruments for the site in 2005, and currently cloud radar data are available. The intent of the site is to monitor the important components of the Arctic atmosphere, including clouds, aerosols, atmospheric radiation, and local-scale atmospheric dynamics. Because of the similarity of ACRF NSA data streams and the important synergy that can be formed between a network of Arctic atmospheric observations, much of the SEARCH observatory data are archived in the ARM archive. Instruments will be added to the site over time. For more information, please visit http://www.db.arm.gov/data. The designation for the archived Eureka data is YEU and is now included in the ACRF user metrics. This quarterly report provides the cumulative numbers of visitors and user accounts by site for the period October 1, 2007 - September 30, 2008. Table 2 shows the summary of cumulative users for the period October 1, 2007 - September 30, 2008. For the fourth quarter of FY 2008, the overall number of users is down substantially (about 30%) from last quarter. Most of this decrease resulted from a reduction in the ACRF Infrastructure users (e.g., site visits, research accounts, on-site device accounts, etc.) associated with the AMF China deployment. While users had easy access to the previous AMF deployment in Germany that resulted in all-time high user statistics, physical and remote access to on-site accounts are extremely limited for the AMF deployment in China. Furthermore, AMF data have not yet been released from China to the Data Management Facility for processing, which affects Archive user statistics. However, Archive users are only down about 10% from last quarter. Another reason for the apparent reduction in Archive users is that data from the Indirect and Semi-Direct Aerosol Campaign (ISDAC), a major field campaign conducted on the North Slope of Alaska, are not yet available to users. For reporting purposes, the three ACRF sites and the AMF operate 24 hours per day, 7 days per week, and 52 weeks per year. Time is reported in days instead of hours. If any lost work time is incurred by any employee, it is counted as a workday loss. Table 3 reports the consecutive days since the last recordable or reportable injury or incident causing damage to property, equipment, or vehicle for the period July 1 - September 30, 2008. There were no incidents this reporting period.« less

  14. Atmospheric Radiation Measurement program climate research facility operations quarterly report October 1 - December 31, 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sisterson, D. L.

    2009-01-15

    Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, they calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month formore » the current year and (2) site and fiscal year (FY) dating back to 1998. The US Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the first quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,097.60 hours (0.95 x 2,208 hours this quarter). The OPSMAX for the North Slope Alaska (NSA) locale is 1,987.20 hours (0.90 x 2,208), and for the Tropical Western Pacific (TWP) locale is 1,876.80 hours (0.85 x 2,208). The OPSMAX time for the ARM Mobile Facility (AMF) is not reported this quarter because the data have not yet been released from China to the DMF for processing. The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period October 1-December 31, 2008, for the fixed sites. The AMF has been deployed to China, but the data have not yet been released. The first quarter comprises a total of 2,208 hours. The average exceeded their goal this quarter.« less

  15. ACE Inhibitor and ARB utilization and expenditures in the Medicaid fee-for-service program from 1991 to 2008.

    PubMed

    Bian, Boyang; Kelton, Christina M L; Guo, Jeff J; Wigle, Patricia R

    2010-01-01

    Angiotensin-converting enzyme (ACE) inhibitors and angiotensin receptor blockers (ARBs) are widely prescribed for the treatment of hypertension and heart failure, as well as for kidney disease prevention in patients with diabetes mellitus and the management of patients after myocardial infarction. To (a) describe ACE inhibitor and ARB utilization and spending in the Medicaid fee-for-service program from 1991 through 2008, and (b) estimate the potential cost savings for the collective Medicaid programs from a higher ratio of generic ACE inhibitor utilization. A retrospective, descriptive analysis was performed using the National Summary Files from the Medicaid State Drug Utilization Data, which are composed of pharmacy claims that are subject to federally mandated rebates from pharmaceutical manufacturers. For the years 1991-2008, quarterly claim counts and expenditures were calculated by summing data for individual ACE inhibitors and ARBs. Quarterly per-claim expenditure as a proxy for drug price was computed for all brand and generic drugs. Market shares were calculated based on the number of pharmacy claims and Medicaid expenditures. In the Medicaid fee-for-service program, ACE inhibitors accounted for 100% of the claims in the combined market for ACE inhibitors and ARBs in 1991, 80.6% in 2000, and 64.7% in 2008. The Medicaid expenditure per ACE inhibitor claim dropped from $37.24 in 1991 to $24.03 in 2008 when generics accounted for 92.5% of ACE inhibitor claims; after adjusting for inflation for the period from 1991 to 2008, the real price drop was 59.2%. Brand ACE inhibitors accounted for only 7.5% of the claims in 2008 for all ACE inhibitors but 32.1% of spending; excluding the effects of manufacturer rebates, Medicaid spending would have been reduced by $28.7 million (9%) in 2008 if all ACE inhibitor claims were generic. The average price per ACE inhibitor claim in 2008 was $24.03 ($17.64 per generic claim vs. $103.45 per brand claim) versus $81.98 per ARB claim. If the ACE inhibitor ratio had been 75% in 2008 rather than 64.7%, the Medicaid program would have saved approximately 13% or about $41.8 million, again excluding the effects of manufacturer rebates. If the ACE inhibitor ratio had been 90% in 2008, the cost savings for the combined Medicaid fee-forservice programs would have been about 33% or about $102.3 million. The total cost savings opportunity with 100% generic ACE inhibitor utilization in 2008 and an ACE inhibitor ratio of 75% was $75.1 million (24%) or $142.3M (46%) with a 90% ACE inhibitor ratio. Factors that affect Medicaid spending by contributing to increased utilization of ACE inhibitors and ARBs, such as the rising prevalence of hypertension, heart disease, and diabetes, can be offset by reduction in the average price attained through a higher proportion of ACE inhibitors and a higher percentage of generic versus brand ACE inhibitors.

  16. Administrative and Technical Support for the U.S. Army Medical Research and Development Command Joint Working Group on Medical Chemical Defense

    DTIC Science & Technology

    1989-08-01

    microproces;qor databaAing systems for monitoring project and contract reports and program technology trans. fers, coordinating and providing administratIvo ...The JWGD 3 annual planning process generally included: - Program review by the JWGD’ membership at quarterly meetings, which consisted of the review...Office developed the program planning and budget documents associated with the planning process outlined above. Program project databases and

  17. Programs That Make An Impact

    DOT National Transportation Integrated Search

    1996-06-17

    The Quarterly Census of Employment and Wages (QCEW) data for June 2006 was used to derive industry employment information for the impact analyses. Only non-farm, nongovernmental business establishments, with accurate location information, was used in...

  18. PQRS Mess.

    PubMed

    Sorrel, Amy Lynn

    2016-03-01

    One-quarter of physicians who participate in the Physician Quality Reporting System and the value modifier program risked payment cuts stemming from difficulties the Centers for Medicare & Medicaid Services had with collecting and analyzing 2014 quality data.

  19. 34 CFR 1100.30 - Where may the fellowship project be conducted?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... INSTITUTE FOR LITERACY NATIONAL INSTITUTE FOR LITERACY: LITERACY LEADER FELLOWSHIP PROGRAM What Conditions... is required to attend quarterly meetings at the National Institute for Literacy in Washington, D.C...

  20. 75 FR 55356 - Proposed Collection, Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-10

    ... implementation process will begin with a pre-test beginning in the first quarter of 2011 to assess cell phone... burden, conducts a pre-clearance consultation program to provide the general public and Federal agencies...

  1. 75 FR 55612 - Proposed Collection, Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-13

    ... implementation process will begin with a pre-test beginning in the first quarter of 2011 to assess cell phone... burden, conducts a pre-clearance consultation program to provide the general public and Federal agencies...

  2. AICD -- Advanced Industrial Concepts Division Biological and Chemical Technologies Research Program. 1993 Annual summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petersen, G.; Bair, K.; Ross, J.

    1994-03-01

    The annual summary report presents the fiscal year (FY) 1993 research activities and accomplishments for the United States Department of Energy (DOE) Biological and Chemical Technologies Research (BCTR) Program of the Advanced Industrial Concepts Division (AICD). This AICD program resides within the Office of Industrial Technologies (OIT) of the Office of Energy Efficiency and Renewable Energy (EE). The annual summary report for 1993 (ASR 93) contains the following: A program description (including BCTR program mission statement, historical background, relevance, goals and objectives), program structure and organization, selected technical and programmatic highlights for 1993, detailed descriptions of individual projects, a listingmore » of program output, including a bibliography of published work, patents, and awards arising from work supported by BCTR.« less

  3. Silicon materials task of the low cost solar array project. Phase 3: Effect of impurities and processing on silicon solar cells

    NASA Technical Reports Server (NTRS)

    Hopkins, R. H.; Davis, J. R.; Blais, P. D.; Rohatgi, A.; Campbell, R. B.; Rai-Choudhury, P.; Mollenkopf, H. C.; Mccormick, J. R.

    1979-01-01

    The 13th quarterly report of a study entitled an Investigation of the Effects of Impurities and Processing on Silicon Solar Cells is given. The objective of the program is to define the effects of impurities, various thermochemical processes and any impurity-process interactions on the performance of terrestrial silicon solar cells. The Phase 3 program effort falls in five areas: (1) cell processing studies; (2) completion of the data base and impurity-performance modeling for n-base cells; (3) extension of p-base studies to include contaminants likely to be introduced during silicon production, refining or crystal growth; (4) anisotropy effects; and (5) a preliminary study of the permanence of impurity effects in silicon solar cells. The quarterly activities for this report focus on tasks (1), (3) and (4).

  4. The National Evaluation of School Nutrition Programs. Final Report - Executive Summary.

    ERIC Educational Resources Information Center

    Radzikowski, Jack

    This is a summary of the final report of a study (begun in 1979) of the National School Lunch, School Breakfast, and Special Milk Programs. The major objectives of the evaluation were to (1) identify existing information on the school nutrition programs; (2) identify determinants of participation in the programs and develop statistical models for…

  5. SUMMARY OF EMISSIONS MANAGEMENT STRATEGY POLICY RELEVANT FINDINGS FROM EPA'S PM SUPERSITES PROGRAM

    EPA Science Inventory

    EPA is developing an integrated synthesis of key scientific and policy-relevant findings from EPA's Particulate Matter Supersites Program. This presentation provides a summary of the program and the integrated synthesis. Since there are many examples of such findings, ranging f...

  6. Simplifying ART cohort monitoring: can pharmacy stocks provide accurate estimates of patients retained on antiretroviral therapy in Malawi?

    PubMed

    Tweya, Hannock; Feldacker, Caryl; Ben-Smith, Anne; Harries, Anthony D; Komatsu, Ryuichi; Jahn, Andreas; Phiri, Sam; Tassie, Jean-Michel

    2012-07-20

    Routine monitoring of patients on antiretroviral therapy (ART) is crucial for measuring program success and accurate drug forecasting. However, compiling data from patient registers to measure retention in ART is labour-intensive. To address this challenge, we conducted a pilot study in Malawi to assess whether patient ART retention could be determined using pharmacy records as compared to estimates of retention based on standardized paper- or electronic based cohort reports. Twelve ART facilities were included in the study: six used paper-based registers and six used electronic data systems. One ART facility implemented an electronic data system in quarter three and was included as a paper-based system facility in quarter two only. Routine patient retention cohort reports, paper or electronic, were collected from facilities for both quarter two [April-June] and quarter three [July-September], 2010. Pharmacy stock data were also collected from the 12 ART facilities over the same period. Numbers of ART continuation bottles recorded on pharmacy stock cards at the beginning and end of each quarter were documented. These pharmacy data were used to calculate the total bottles dispensed to patients in each quarter with intent to estimate the number of patients retained on ART. Information for time required to determine ART retention was gathered through interviews with clinicians tasked with compiling the data. Among ART clinics with paper-based systems, three of six facilities in quarter two and four of five facilities in quarter three had similar numbers of patients retained on ART comparing cohort reports to pharmacy stock records. In ART clinics with electronic systems, five of six facilities in quarter two and five of seven facilities in quarter three had similar numbers of patients retained on ART when comparing retention numbers from electronically generated cohort reports to pharmacy stock records. Among paper-based facilities, an average of 13 4 hours was needed to calculate patient retention for cohort reporting using patient registers as compared to 2.25 hours using pharmacy stock cards. The numbers of patients retained on ART as estimated using pharmacy stock records were largely similar to estimates based on either paper registers or electronic data system. Furthermore, less time and staff effort was needed to estimate ART patient retention using pharmacy stock records versus paper-based registers. Reinforcing ARV stock management may improve the precision of estimates.

  7. Apollo Program Summary Report: Synopsis of the Apollo Program Activities and Technology for Lunar Exploration

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Overall program activities and the technology developed to accomplish lunar exploration are discussed. A summary of the flights conducted over an 11-year period is presented along with specific aspects of the overall program, including lunar science, vehicle development and performance, lunar module development program, spacecraft development testing, flight crew summary, mission operations, biomedical data, spacecraft manufacturing and testing, launch site facilities, equipment, and prelaunch operations, and the lunar receiving laboratory. Appendixes provide data on each of the Apollo missions, mission type designations, spacecraft weights, records achieved by Apollo crewmen, vehicle histories, and a listing of anomalous hardware conditions noted during each flight beginning with Apollo 4.

  8. Simulation Activity for Initiating Thinking about Year Around School Plans.

    ERIC Educational Resources Information Center

    Sagness, Richard L.

    This document presents a three-step model for providing teachers with basic information on year-round or extended school plans. As a first step, descriptions of basic plans are given. The four used in this paper are Staggered Quarter for All, Full 48-week School Year for All, Voluntary Summer Program, and A Summer Program for Professional…

  9. Linking Geography to Reading and English Language Learners' Achievement in US Elementary and Middle School Classrooms

    ERIC Educational Resources Information Center

    Hinde, Elizabeth R.; Osborn Popp, Sharon E.; Jimenez-Silva, Margarita; Dorn, Ronald I.

    2011-01-01

    The "GeoLiteracy for English language learners" (ELLs) program is a curriculum that enhances reading and writing skills while teaching geography content for US students in kindergarten through eighth grades. The program includes 85 lesson plans that address all US national geography standards, a quarter of which address environmental…

  10. A Survey of Rorschach Teaching in APA-Approved Clinical Graduate Programs

    ERIC Educational Resources Information Center

    Del Gaudio, Andrew C.; Ritzler, Barry A.

    1976-01-01

    This survey of APA-approved doctoral programs in clinical psychology provides a status assessment of the Rorschach technique. Eighty-one percent emphasized the technique; a quarter offered the course for a full year; respondents with more experience rated the technique higher; and its was rated highly as a clinical tool and teaching aid, but low…

  11. NASA Sun-Earth Connections Theory Program: The Structure and Dynamics of the Solar Corona and Inner Heliosphere

    NASA Technical Reports Server (NTRS)

    Mikic, Zoran; Grebowsky, Joseph (Technical Monitor)

    2001-01-01

    This report covers technical progress during the first quarter of the second year of NASA Sun-Earth Connections Theory Program (SECTP). SAIC and the University of California, Irvine (UCI) have conducted research into theoretical modeling of active regions, the solar corona, and the inner heliosphere, using the MHD model.

  12. Leading Contributors to the Research Consortium's Annual Program, 1992-2011: High-Visibility Institutions, Researchers, and Topics

    ERIC Educational Resources Information Center

    Cardinal, Bradley J.; Lee, Hyo

    2013-01-01

    Between 1992-2011, peer-reviewed research on the Research Consortium's annual program has been published in abstract form in the "Research Quarterly for Exercise and Sport". On the basis of frequency, high-visibility institutions, researchers, and sub-disciplinary categories were identified. Data were extracted from each abstract (N =…

  13. 78 FR 17995 - Agency Information Collection Activity Under OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-25

    ... collections: 49 U.S.C. Section 5337--State of Good Repair Program 49 U.S.C. Section 5339--Bus and Bus... on a quarterly basis. The information submitted ensures FTA's compliance with applicable federal laws. Title: 49 U.S.C. Section 5339--Bus and Bus Facilities Program. Abstract: 49 U.S.C. 5339--Bus and Bus...

  14. Adult Continuing Education and Human Resource Development: Present Competitors, Potential Partners

    ERIC Educational Resources Information Center

    Smith, Douglas H.

    2006-01-01

    Adult Continuing Education (ACE) and Human Resource Development (HRD) have grown tremendously in the last quarter century. ACE experienced tremendous growth in the 60s and 70s, with over 17 million attending colleges and universities, and local school and community adult education programs by the end of the 1970s. More ACE programs were started…

  15. Government Information Quarterly. Volume 7, no. 2: National Aeronautics and Space Administration Scientific and Technical Information Programs. Special issue

    NASA Technical Reports Server (NTRS)

    Hernon, Peter (Editor); Mcclure, Charles R. (Editor); Pinelli, Thomas E. (Editor)

    1990-01-01

    NASA scientific and technical information (STI) programs are discussed. Topics include management of information in a research and development agency, the new space and Earth science information systems at NASA's archive, scientific and technical information management, and technology transfer of NASA aerospace technology to other industries.

  16. Delivering digital health and well-being at scale: lessons learned during the implementation of the dallas program in the United Kingdom.

    PubMed

    Devlin, Alison M; McGee-Lennon, Marilyn; O'Donnell, Catherine A; Bouamrane, Matt-Mouley; Agbakoba, Ruth; O'Connor, Siobhan; Grieve, Eleanor; Finch, Tracy; Wyke, Sally; Watson, Nicholas; Browne, Susan; Mair, Frances S

    2016-01-01

    To identify implementation lessons from the United Kingdom Delivering Assisted Living Lifestyles at Scale (dallas) program-a large-scale, national technology program that aims to deliver a broad range of digital services and products to the public to promote health and well-being. Prospective, longitudinal qualitative research study investigating implementation processes. Qualitative data collected includes semi-structured e-Health Implementation Toolkit-led interviews at baseline/mid-point (n = 38), quarterly evaluation, quarterly technical and barrier and solutions reports, observational logs, quarterly evaluation alignment interviews with project leads, observational data collected during meetings, and ethnographic data from dallas events (n > 200 distinct pieces of qualitative data). Data analysis was guided by Normalization Process Theory, a sociological theory that aids conceptualization of implementation issues in complex healthcare settings. Five key challenges were identified: 1) The challenge of establishing and maintaining large heterogeneous, multi-agency partnerships to deliver new models of healthcare; 2) The need for resilience in the face of barriers and set-backs including the backdrop of continually changing external environments; 3) The inherent tension between embracing innovative co-design and achieving delivery at pace and at scale; 4) The effects of branding and marketing issues in consumer healthcare settings; and 5) The challenge of interoperability and information governance, when commercial proprietary models are dominant. The magnitude and ambition of the dallas program provides a unique opportunity to investigate the macro level implementation challenges faced when designing and delivering digital health and wellness services at scale. Flexibility, adaptability, and resilience are key implementation facilitators when shifting to new digitally enabled models of care. © The Author 2015. Published by Oxford University Press on behalf of the American Medical Informatics Association.

  17. Seven Q-Tracks monitors of laboratory quality drive general performance improvement: experience from the College of American Pathologists Q-Tracks program 1999-2011.

    PubMed

    Meier, Frederick A; Souers, Rhona J; Howanitz, Peter J; Tworek, Joseph A; Perrotta, Peter L; Nakhleh, Raouf E; Karcher, Donald S; Bashleben, Christine; Darcy, Teresa P; Schifman, Ron B; Jones, Bruce A

    2015-06-01

    Many production systems employ standardized statistical monitors that measure defect rates and cycle times, as indices of performance quality. Clinical laboratory testing, a system that produces test results, is amenable to such monitoring. To demonstrate patterns in clinical laboratory testing defect rates and cycle time using 7 College of American Pathologists Q-Tracks program monitors. Subscribers measured monthly rates of outpatient order-entry errors, identification band defects, and specimen rejections; median troponin order-to-report cycle times and rates of STAT test receipt-to-report turnaround time outliers; and critical values reporting event defects, and corrected reports. From these submissions Q-Tracks program staff produced quarterly and annual reports. These charted each subscriber's performance relative to other participating laboratories and aggregate and subgroup performance over time, dividing participants into best and median performers and performers with the most room to improve. Each monitor's patterns of change present percentile distributions of subscribers' performance in relation to monitoring durations and numbers of participating subscribers. Changes over time in defect frequencies and the cycle duration quantify effects on performance of monitor participation. All monitors showed significant decreases in defect rates as the 7 monitors ran variously for 6, 6, 7, 11, 12, 13, and 13 years. The most striking decreases occurred among performers who initially had the most room to improve and among subscribers who participated the longest. All 7 monitors registered significant improvement. Participation effects improved between 0.85% and 5.1% per quarter of participation. Using statistical quality measures, collecting data monthly, and receiving reports quarterly and yearly, subscribers to a comparative monitoring program documented significant decreases in defect rates and shortening of a cycle time for 6 to 13 years in all 7 ongoing clinical laboratory quality monitors.

  18. American Recovery and Reinvestment Act (ARRA) statistical summaries.

    DOT National Transportation Integrated Search

    2012-05-01

    The American Recovery and Reinvestment Act (ARRA) Statistical Summaries provide information about the Federal Transit Administrations (FTA) financial investment programs funded through ARRA.This report covers the Urbanized Area Formula Program and...

  19. 40 CFR 130.0 - Program summary and purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.0 Program summary and purpose. (a) This subpart establishes policies and program requirements for water quality planning, management and implementation under sections 106, 205(j), non-construction management 205(g), 208, 303 and 305 of the Clean Water Act. The Water Quality...

  20. Summary of the COS Cycle 20 Calibration Program

    NASA Astrophysics Data System (ADS)

    Roman-Duval, Julia; Aloisi, Alessandra; Bostroem, K. Azalee; Ely, Justin; Holland, Stephen; Lockwood, Sean; Oliveira, Cristina; Penton, Steven; Proffitt, Charles; Sahnow, David; Sonnentrucker, Paule; Welty, Alan D.; Wheeler, Thomas

    2015-06-01

    We summarize the Cycle 20 calibration program for the Cosmic Origins Spectrograph (COS) on the Hubble Space Telescope, covering the time period from November 2012 through October 2013. We give an overview of the Calibration plan and status summaries for each of the individual proposals comprising the C20 Calibration program.

  1. Summary of the COS Cycle 21 Calibration Program

    NASA Astrophysics Data System (ADS)

    Sana, Hugues; Fox, Andrew; Roman-Duval, Julia; Ely, Justin; Bostroem, K. Azalee; Lockwood, Sean; Oliveira, Cristina; Penton, Steve; Proffitt, Charles; Sahnow, David; Sonnentrucker, Paule; Welty, Alan D.; Wheeler, Thomas

    2015-09-01

    We summarize the Cycle 21 calibration program for the Cosmic Origins Spectrograph (COS) on the Hubble Space Telescope, covering the time period from November 2013 through October 2014. We give an overview of the Calibration plan and status summaries for each of the individual proposals comprising the C21 Calibration program.

  2. 23 CFR Appendix B to Part 1200 - HIGHWAY SAFETY PROGRAM COST SUMMARY (HS-217)

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false HIGHWAY SAFETY PROGRAM COST SUMMARY (HS-217) B APPENDIX B TO PART 1200 Highways NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION AND FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROCEDURES FOR STATE HIGHWAY SAFETY PROGRAMS UNIFORM PROCEDURES FOR...

  3. 23 CFR Appendix B to Part 1200 - Highway Safety Program Cost Summary (HS-217)

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Highway Safety Program Cost Summary (HS-217) B Appendix B to Part 1200 Highways NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION AND FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROCEDURES FOR STATE HIGHWAY SAFETY PROGRAMS UNIFORM PROCEDURES FOR...

  4. 40 CFR 130.0 - Program summary and purpose.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.0 Program summary and purpose. (a) This subpart establishes policies and program requirements for water quality planning, management and implementation under sections 106, 205(j), non-construction management 205(g), 208, 303 and 305 of the Clean Water Act. The Water Quality...

  5. 40 CFR 130.0 - Program summary and purpose.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.0 Program summary and purpose. (a) This subpart establishes policies and program requirements for water quality planning, management and implementation under sections 106, 205(j), non-construction management 205(g), 208, 303 and 305 of the Clean Water Act. The Water Quality...

  6. 40 CFR 130.0 - Program summary and purpose.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.0 Program summary and purpose. (a) This subpart establishes policies and program requirements for water quality planning, management and implementation under sections 106, 205(j), non-construction management 205(g), 208, 303 and 305 of the Clean Water Act. The Water Quality...

  7. Quarterly report of RCRA groundwater monitoring data for period January 1, 1993 through March 31, 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-07-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. This quarterly report contains data received between March 8 and May 24, 1993, which are the cutoffmore » dates for this reporting period. This report may contain not only data from the January through March quarter but also data from earlier sampling events that were not previously reported.« less

  8. E2E: A Summary of the e2e Learning Framework.

    ERIC Educational Resources Information Center

    Learning and Skills Development Agency, London (England).

    This publication is a summary of the E2E (Entry to Employment) Learning Framework that provides guidance on program implementation. (E2E is a new learning program for young people not yet ready or able to enter Modern Apprenticeship programs, a Level 2 program, or employment directly.) Section 2 highlights core values to which all involved should…

  9. Working with Families: Promising Programs To Help Parents Support Young Children's Learning. Summary of Findings. Final Report.

    ERIC Educational Resources Information Center

    Goodson, Barbara Dillon; And Others

    This report presents the findings of a study conducted for the U.S. Department of Education that analyzed 17 family education programs for disadvantaged families. In-depth studies were conducted on-site for 7 programs; an additional 10 programs were studied via telephone interviews. An "Executive Summary" of eleven pages (also separately…

  10. 7 CFR 1486.500 - What are the reporting requirements of the program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the project, both electronically (preferably in PDF format) and in hard copy. (3) Reporting requirements and formats for both quarterly progress reports and final performance reports are specified in the...

  11. Saturn Apollo Program

    NASA Image and Video Library

    1964-02-01

    Temporary quarters in the Huntsville Industrial Center (HIC) building located in downtown Huntsville, Alabama, as Marshall Space Flight Center (MSFC) grew. This image shows drafting specialists from the Propulsion and Vehicle Engineering Laboratory at work in the HIC building.

  12. 12 CFR 1805.101 - Summary.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Banking COMMUNITY DEVELOPMENT FINANCIAL INSTITUTIONS FUND, DEPARTMENT OF THE TREASURY COMMUNITY DEVELOPMENT FINANCIAL INSTITUTIONS PROGRAM General Provisions § 1805.101 Summary. Under the Community Development Financial Institutions Program, the Fund will provide financial and technical assistance to...

  13. 12 CFR 1805.101 - Summary.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Banking COMMUNITY DEVELOPMENT FINANCIAL INSTITUTIONS FUND, DEPARTMENT OF THE TREASURY COMMUNITY DEVELOPMENT FINANCIAL INSTITUTIONS PROGRAM General Provisions § 1805.101 Summary. Under the Community Development Financial Institutions Program, the Fund will provide financial and technical assistance to...

  14. 12 CFR 1805.101 - Summary.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Banking COMMUNITY DEVELOPMENT FINANCIAL INSTITUTIONS FUND, DEPARTMENT OF THE TREASURY COMMUNITY DEVELOPMENT FINANCIAL INSTITUTIONS PROGRAM General Provisions § 1805.101 Summary. Under the Community Development Financial Institutions Program, the Fund will provide financial and technical assistance to...

  15. 12 CFR 1805.101 - Summary.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Banking COMMUNITY DEVELOPMENT FINANCIAL INSTITUTIONS FUND, DEPARTMENT OF THE TREASURY COMMUNITY DEVELOPMENT FINANCIAL INSTITUTIONS PROGRAM General Provisions § 1805.101 Summary. Under the Community Development Financial Institutions Program, the Fund will provide financial and technical assistance to...

  16. Collecting costs of community prevention programs: communities putting prevention to work initiative.

    PubMed

    Khavjou, Olga A; Honeycutt, Amanda A; Hoerger, Thomas J; Trogdon, Justin G; Cash, Amanda J

    2014-08-01

    Community-based programs require substantial investments of resources; however, evaluations of these programs usually lack analyses of program costs. Costs of community-based programs reported in previous literature are limited and have been estimated retrospectively. To describe a prospective cost data collection approach developed for the Communities Putting Prevention to Work (CPPW) program capturing costs for community-based tobacco use and obesity prevention strategies. A web-based cost data collection instrument was developed using an activity-based costing approach. Respondents reported quarterly expenditures on labor; consultants; materials, travel, and services; overhead; partner efforts; and in-kind contributions. Costs were allocated across CPPW objectives and strategies organized around five categories: media, access, point of decision/promotion, price, and social support and services. The instrument was developed in 2010, quarterly data collections took place in 2011-2013, and preliminary analysis was conducted in 2013. Preliminary descriptive statistics are presented for the cost data collected from 51 respondents. More than 50% of program costs were for partner organizations, and over 20% of costs were for labor hours. Tobacco communities devoted the majority of their efforts to media strategies. Obesity communities spent more than half of their resources on access strategies. Collecting accurate cost information on health promotion and disease prevention programs presents many challenges. The approach presented in this paper is one of the first efforts successfully collecting these types of data and can be replicated for collecting costs from other programs. Copyright © 2014 American Journal of Preventive Medicine. All rights reserved.

  17. United States Air Force Statistical Digest, Fiscal Year 1965, Twentieth Edition

    DTIC Science & Technology

    1965-09-30

    prOVided by the USAF under Military Assistance Program . MAP EMPLOYEES - Category of civilian personnel engaged in activities reqUired in carrying out the...92 - USAF CIVIUAN EMPLOYEES IN SALARIED AND WAGE BOARD GROUPS EMPLOYED UNDER MILITARY ASSISTANCE PROGRAM (MAP), WORLO-WIDE, AT END OF QUARTER - FY...statistical material for tary Assistance Program (MAP), and re- the digest. AFCHO will furnish a chronology lated studies and historical events. of

  18. Directory of research projects, 1991. Planetary geology and geophysics program

    NASA Technical Reports Server (NTRS)

    Maxwell, Ted A. (Editor)

    1991-01-01

    Information is provided about currently funded scientific research within the Planetary Geology and Geophysics Program. The directory consists of the proposal summary sheet from each proposal funded by the program during fiscal year 1991. Information is provided on the research topic, principal investigator, institution, summary of research objectives, past accomplishments, and proposed investigators.

  19. Building Management Information Systems to Coordinate Citywide Afterschool Programs: A Toolkit for Cities. Executive Summary

    ERIC Educational Resources Information Center

    Kingsley, Chris

    2012-01-01

    This executive summary describes highlights from the report, "Building Management Information Systems to Coordinate Citywide Afterschool Programs: A Toolkit for Cities." City-led efforts to build coordinated systems of afterschool programming are an important strategy for improving the health, safety and academic preparedness of children…

  20. An Evaluation of the Nutrition Education and Training Program: Project Summary.

    ERIC Educational Resources Information Center

    St. Pierre, Robert G.

    This project summary reviews and extends the findings of prior reports made by Abt Associates, Inc. (Cambridge, Massachusetts) on the Nutrition Education and Training (NET) program, synthesizes evaluation efforts in nutrition education, and presents a set of conclusions based on the evaluations of nutrition programs. Chapter 1 presents background…

Top