Sample records for program schedule baseline

  1. Space Station needs, attributes and architectural options, volume 2, book 3: Cost and programmatics

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The cost and programmatic considerations which integrate mission requirements and architectural options into a cohesive system for exploitation of space opportunities within affordable limits are discussed. The mission requirements, baseline architecture, a top level baseline schedule, and acquisition costs are summarized. The work breakdown structure (WBS) used to structure the program, and the WBS dictionary are included. The costing approach used, including the operation of the primary costing tool, the SPACE cost model are described. The rationale for the choice of cost estimating relationships is given and costs at the module level are shown. Detailed costs at the subsystem level are shown. The baseline schedule and annual funding profiles are provided. Alternate schedules are developed to provide different funding profiles. Alternate funding sources are discussed and foreign and contractor participation is outlined. The results of the benefit analysis are given and the accrued benefits deriving from an implemented space station program are outlined.

  2. Modular space station phase B extension program cost and schedules. Volume 1: Cost and schedule estimating process and results

    NASA Technical Reports Server (NTRS)

    Frassinelli, G. J.

    1972-01-01

    Cost estimates and funding schedules are presented for a given configuration and costing ground rules. Cost methodology is described and the cost evolution from a baseline configuration to a selected configuration is given, emphasizing cases in which cost was a design driver. Programmatic cost avoidance techniques are discussed.

  3. Phase C/D program development plan. Volume 1: Program plan

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.

  4. Response-reinforcer dependency and resistance to change.

    PubMed

    Cançado, Carlos R X; Abreu-Rodrigues, Josele; Aló, Raquel Moreira; Hauck, Flávia; Doughty, Adam H

    2018-01-01

    The effects of the response-reinforcer dependency on resistance to change were studied in three experiments with rats. In Experiment 1, lever pressing produced reinforcers at similar rates after variable interreinforcer intervals in each component of a two-component multiple schedule. Across conditions, in the fixed component, all reinforcers were response-dependent; in the alternative component, the percentage of response-dependent reinforcers was 100, 50 (i.e., 50% response-dependent and 50% response-independent) or 10% (i.e., 10% response-dependent and 90% response-independent). Resistance to extinction was greater in the alternative than in the fixed component when the dependency in the former was 10%, but was similar between components when this dependency was 100 or 50%. In Experiment 2, a three-component multiple schedule was used. The dependency was 100% in one component and 10% in the other two. The 10% components differed on how reinforcers were programmed. In one component, as in Experiment 1, a reinforcer had to be collected before the scheduling of other response-dependent or independent reinforcers. In the other component, response-dependent and -independent reinforcers were programmed by superimposing a variable-time schedule on an independent variable-interval schedule. Regardless of the procedure used to program the dependency, resistance to extinction was greater in the 10% components than in the 100% component. These results were replicated in Experiment 3 in which, instead of extinction, VT schedules replaced the baseline schedules in each multiple-schedule component during the test. We argue that the relative change in dependency from Baseline to Test, which is greater when baseline dependencies are high rather than low, could account for the differential resistance to change in the present experiments. The inconsistencies in results across the present and previous experiments suggest that the effects of dependency on resistance to change are not well understood. Additional systematic analyses are important to further understand the effects of the response-reinforcer relation on resistance to change and to the development of a more comprehensive theory of behavioral persistence. © 2017 Society for the Experimental Analysis of Behavior.

  5. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  6. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  7. Exploiting Vector and Multicore Parallelsim for Recursive, Data- and Task-Parallel Programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ren, Bin; Krishnamoorthy, Sriram; Agrawal, Kunal

    Modern hardware contains parallel execution resources that are well-suited for data-parallelism-vector units-and task parallelism-multicores. However, most work on parallel scheduling focuses on one type of hardware or the other. In this work, we present a scheduling framework that allows for a unified treatment of task- and data-parallelism. Our key insight is an abstraction, task blocks, that uniformly handles data-parallel iterations and task-parallel tasks, allowing them to be scheduled on vector units or executed independently as multicores. Our framework allows us to define schedulers that can dynamically select between executing task- blocks on vector units or multicores. We show that thesemore » schedulers are asymptotically optimal, and deliver the maximum amount of parallelism available in computation trees. To evaluate our schedulers, we develop program transformations that can convert mixed data- and task-parallel pro- grams into task block-based programs. Using a prototype instantiation of our scheduling framework, we show that, on an 8-core system, we can simultaneously exploit vector and multicore parallelism to achieve 14×-108× speedup over sequential baselines.« less

  8. Scheduling with Automatic Resolution of Conflicts

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Schaffer, Steve

    2006-01-01

    DSN Requirement Scheduler is a computer program that automatically schedules, reschedules, and resolves conflicts for allocations of resources of NASA s Deep Space Network (DSN) on the basis of ever-changing project requirements for DSN services. As used here, resources signifies, primarily, DSN antennas, ancillary equipment, and times during which they are available. Examples of project-required DSN services include arraying, segmentation, very-long-baseline interferometry, and multiple spacecraft per aperture. Requirements can include periodic reservations of specific or optional resources during specific time intervals or within ranges specified in terms of starting times and durations. This program is built on the Automated Scheduling and Planning Environment (ASPEN) software system (aspects of which have been described in previous NASA Tech Briefs articles), with customization to reflect requirements and constraints involved in allocation of DSN resources. Unlike prior DSN-resource- scheduling programs that make single passes through the requirements and require human intervention to resolve conflicts, this program makes repeated passes in a continuing search for all possible allocations, provides a best-effort solution at any time, and presents alternative solutions among which users can choose.

  9. Runway Scheduling Using Generalized Dynamic Programming

    NASA Technical Reports Server (NTRS)

    Montoya, Justin; Wood, Zachary; Rathinam, Sivakumar

    2011-01-01

    A generalized dynamic programming method for finding a set of pareto optimal solutions for a runway scheduling problem is introduced. The algorithm generates a set of runway fight sequences that are optimal for both runway throughput and delay. Realistic time-based operational constraints are considered, including miles-in-trail separation, runway crossings, and wake vortex separation. The authors also model divergent runway takeoff operations to allow for reduced wake vortex separation. A modeled Dallas/Fort Worth International airport and three baseline heuristics are used to illustrate preliminary benefits of using the generalized dynamic programming method. Simulated traffic levels ranged from 10 aircraft to 30 aircraft with each test case spanning 15 minutes. The optimal solution shows a 40-70 percent decrease in the expected delay per aircraft over the baseline schedulers. Computational results suggest that the algorithm is promising for real-time application with an average computation time of 4.5 seconds. For even faster computation times, two heuristics are developed. As compared to the optimal, the heuristics are within 5% of the expected delay per aircraft and 1% of the expected number of runway operations per hour ad can be 100x faster.

  10. Navy Irregular Warfare and Counterterrorism Operations: Background and Issues for Congress

    DTIC Science & Technology

    2015-09-25

    practices in which suspects were sent to the U.S. detention facility at Guantanamo Bay, Cuba, or secret CIA prisons. The process ordinarily begins with...But prototype DCS mini-subs cannot fit inside the current shelter design. As a result , a modernization program will stretch the DDS units by 50...In June 2014, the SWCS program was re-baselined as a result of significant cost and schedule overruns. Less than a year after this re-baselining, the

  11. Report of the Cost Assessment and Validation Task Force on the International Space Station

    NASA Technical Reports Server (NTRS)

    1998-01-01

    The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort. The Program size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap. A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule. The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program. The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required. Completion of ISS assembly is likely to be delayed from one to three years beyond December 2003.

  12. Cost Assessment and Validation Task Force on the International Space Station

    NASA Technical Reports Server (NTRS)

    1998-01-01

    The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort; The Program, size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap; A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule; The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program; The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program, growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required; and Completion of ISS assembly is likely to be delayed from, one to three years beyond December 2003.

  13. Project resource reallocation algorithm

    NASA Technical Reports Server (NTRS)

    Myers, J. E.

    1981-01-01

    A methodology for adjusting baseline cost estimates according to project schedule changes is described. An algorithm which performs a linear expansion or contraction of the baseline project resource distribution in proportion to the project schedule expansion or contraction is presented. Input to the algorithm consists of the deck of cards (PACE input data) prepared for the baseline project schedule as well as a specification of the nature of the baseline schedule change. Output of the algorithm is a new deck of cards with all work breakdown structure block and element of cost estimates redistributed for the new project schedule. This new deck can be processed through PACE to produce a detailed cost estimate for the new schedule.

  14. Modular space station phase B extension period executive summary

    NASA Technical Reports Server (NTRS)

    Tischler, A. A.; Could, C. L.

    1972-01-01

    A narrative summary is presented of technical, programmatic, and planning information developed during the space station definition study extension period. The modular space station is emphasized, but tasks pertaining to shuttle sorties missions and information management advanced development are included. A series of program options considering technical, schedule, and programmatic alternatives to the baseline program are defined and evaluated.

  15. Baseline response rates affect resistance to change.

    PubMed

    Kuroda, Toshikazu; Cook, James E; Lattal, Kennon A

    2018-01-01

    The effect of response rates on resistance to change, measured as resistance to extinction, was examined in two experiments. In Experiment 1, responding in transition from a variable-ratio schedule and its yoked-interval counterpart to extinction was compared with pigeons. Following training on a multiple variable-ratio yoked-interval schedule of reinforcement, in which response rates were higher in the former component, reinforcement was removed from both components during a single extended extinction session. Resistance to extinction in the yoked-interval component was always either greater or equal to that in the variable-ratio component. In Experiment 2, resistance to extinction was compared for two groups of rats that exhibited either high or low response rates when maintained on identical variable-interval schedules. Resistance to extinction was greater for the lower-response-rate group. These results suggest that baseline response rate can contribute to resistance to change. Such effects, however, can only be revealed when baseline response rate and reinforcement rate are disentangled (Experiments 1 and 2) from the more usual circumstance where the two covary. Furthermore, they are more cleanly revealed when the programmed contingencies controlling high and low response rates are identical, as in Experiment 2. © 2017 Society for the Experimental Analysis of Behavior.

  16. The Franco-German DBS program 'TV-SAT/TDF-1'

    NASA Astrophysics Data System (ADS)

    Arnim, R.

    Governmental authorities of Germany and France have jointly awarded a contract to industry for two DBS satellites, to be launched in 1985, which will then serve Germany and France with direct-to-home broadcasting. This paper provides an overview of the background of the Franco-German program, the scope of the program, its technical baseline and configuration, its delivery schedule, its present status, and information on the customer and contractor side.

  17. Aspects of the Patient-centered Medical Home currently in place: initial findings from preparing the personal physician for practice.

    PubMed

    Carney, Patricia A; Eiff, M Patrice; Saultz, John W; Douglass, Alan B; Tillotson, Carrie J; Crane, Steven D; Jones, Samuel M; Green, Larry A

    2009-10-01

    The Patient-centered Medical Home (PCMH) is a central concept in the evolving debate about American health care reform. We studied family medicine residency training programs' continuity clinics to assess baseline status of implementing PCMH components and to compare implementation status between community-based and university training programs. We conducted a survey 24 continuity clinics in 14 residency programs that are part of the Preparing the Personal Physicians for Practice (P(4)) program. We asked questions about aspects of P(4) that had been already implemented at the beginning of the P(4) program. We defined high implementation as aspects that were present in >50% of clinics and low implementation as those present in <50% of clinics. We compared features at university-based and community-based clinics. High areas of implementation were having an electronic health record (EHR), fully secured remote access, electronic patient notes/scheduling/billing, chronic disease management registries, and open-access scheduling. Low areas of implementation included hospital EHR with computerized physician order entry, asynchronous communication with patients, ongoing population-based QA using EHR, use of preventive registries, and practice-based research using EHR. Few differences were noted between university- and community-based residency programs. Many features of the PCMH were already established at baseline in programs participating in P(4).

  18. Adaptive Programming Improves Outcomes in Drug Court: An Experimental Trial.

    PubMed

    Marlowe, Douglas B; Festinger, David S; Dugosh, Karen L; Benasutti, Kathleen M; Fox, Gloria; Croft, Jason R

    2012-04-01

    Prior studies in Drug Courts reported improved outcomes when participants were matched to schedules of judicial status hearings based on their criminological risk level. The current experiment determined whether incremental efficacy could be gained by periodically adjusting the schedule of status hearings and clinical case-management sessions in response to participants' ensuing performance in the program. The adjustments were made pursuant to a priori criteria specified in an adaptive algorithm. Results confirmed that participants in the full adaptive condition (n = 62) were more than twice as likely as those assigned to baseline-matching only (n = 63) to be drug-abstinent during the first 18 weeks of the program; however, graduation rates and the average time to case resolution were not significantly different. The positive effects of the adaptive program appear to have stemmed from holding noncompliant participants more accountable for meeting their attendance obligations in the program. Directions for future research and practice implications are discussed.

  19. A facility-wide approach to recreation programming for adults who are severely and profoundly retarded.

    PubMed

    Burch, M R; Reiss, M; Bailey, J S

    1985-01-01

    A facility-wide recreation program was designed and implemented in order to increase staff and client participation in daily leisure activities at an intermediate care facility for severely and profoundly mentally retarded adults. The baseline phase of the study consisted of having recreational materials available during scheduled recreation periods. The treatment was a package program consisting of (1) providing the staff with preplanned materials and activities, (2) assigning staff to specific roles, and (3) monitoring staff and providing feedback by supervisors. The treatment was implemented on the two living units of the Liberty Intermediate Care Facility. Treatment effects were similar on both units. Client participation increased from a baseline average of less than 10% to nearly 50% and staff participation increased from less than 10% to an average of 60% during program implementation.

  20. Joint Light Tactical Vehicle (JLTV)

    DTIC Science & Technology

    2013-12-01

    BY - Base Year DAMIR - Defense Acquisition Management Information Retrieval Dev Est - Development Estimate DoD - Department of Defense DSN - Defense...Production Estimate QR - Quantity Related Qty - Quantity RDT&E - Research, Development , Test, and Evaluation SAR - Selected Acquisition Report Sch - Schedule... Development Estimate) Defense Acquisition Executive (DAE) Approved Acquisition Program Baseline (APB) dated October 23, 2012 Approved APB Defense

  1. Adaptive Programming Improves Outcomes in Drug Court: An Experimental Trial

    PubMed Central

    Marlowe, Douglas B.; Festinger, David S.; Dugosh, Karen L.; Benasutti, Kathleen M.; Fox, Gloria; Croft, Jason R.

    2011-01-01

    Prior studies in Drug Courts reported improved outcomes when participants were matched to schedules of judicial status hearings based on their criminological risk level. The current experiment determined whether incremental efficacy could be gained by periodically adjusting the schedule of status hearings and clinical case-management sessions in response to participants’ ensuing performance in the program. The adjustments were made pursuant to a priori criteria specified in an adaptive algorithm. Results confirmed that participants in the full adaptive condition (n = 62) were more than twice as likely as those assigned to baseline-matching only (n = 63) to be drug-abstinent during the first 18 weeks of the program; however, graduation rates and the average time to case resolution were not significantly different. The positive effects of the adaptive program appear to have stemmed from holding noncompliant participants more accountable for meeting their attendance obligations in the program. Directions for future research and practice implications are discussed. PMID:22923854

  2. A trial of scheduled deep brain stimulation for Tourette syndrome: moving away from continuous deep brain stimulation paradigms.

    PubMed

    Okun, Michael S; Foote, Kelly D; Wu, Samuel S; Ward, Herbert E; Bowers, Dawn; Rodriguez, Ramon L; Malaty, Irene A; Goodman, Wayne K; Gilbert, Donald M; Walker, Harrison C; Mink, Jonathan W; Merritt, Stacy; Morishita, Takashi; Sanchez, Justin C

    2013-01-01

    To collect the information necessary to design the methods and outcome variables for a larger trial of scheduled deep brain stimulation (DBS) for Tourette syndrome. We performed a small National Institutes of Health-sponsored clinical trials planning study of the safety and preliminary efficacy of implanted DBS in the bilateral centromedian thalamic region. The study used a cranially contained constant-current device and a scheduled, rather than the classic continuous, DBS paradigm. Baseline vs 6-month outcomes were collected and analyzed. In addition, we compared acute scheduled vs acute continuous vs off DBS. A university movement disorders center. Five patients with implanted DBS. A 50% improvement in the Yale Global Tic Severity Scale (YGTSS) total score. RESULTS Participating subjects had a mean age of 34.4 (range, 28-39) years and a mean disease duration of 28.8 years. No significant adverse events or hardware-related issues occurred. Baseline vs 6-month data revealed that reductions in the YGTSS total score did not achieve the prestudy criterion of a 50% improvement in the YGTSS total score on scheduled stimulation settings. However, statistically significant improvements were observed in the YGTSS total score (mean [SD] change, -17.8 [9.4]; P=.01), impairment score (-11.3 [5.0]; P=.007), and motor score (-2.8 [2.2]; P=.045); the Modified Rush Tic Rating Scale Score total score (-5.8 [2.9]; P=.01); and the phonic tic severity score (-2.2 [2.6]; P=.04). Continuous, off, and scheduled stimulation conditions were assessed blindly in an acute experiment at 6 months after implantation. The scores in all 3 conditions showed a trend for improvement. Trends for improvement also occurred with continuous and scheduled conditions performing better than the off condition. Tic suppression was commonly seen at ventral (deep) contacts, and programming settings resulting in tic suppression were commonly associated with a subjective feeling of calmness. This study provides safety and proof of concept that a scheduled DBS approach could improve motor and vocal tics in Tourette syndrome. Refinements in neurostimulator battery life, outcome measure selection, and flexibility in programming settings can be used to enhance outcomes in a future larger study. Scheduled stimulation holds promise as a potential first step for shifting movement and neuropsychiatric disorders toward more responsive neuromodulation approaches. clinicaltrials.gov Identifier: NCT01329198.

  3. A work-for-food enrichment program increases exploration and decreases stereotypies in four species of bears.

    PubMed

    Wagman, Jason D; Lukas, Kristen E; Dennis, Patricia M; Willis, Mark A; Carroscia, Joe; Gindlesperger, Curt; Schook, Mandi W

    2018-01-01

    Zoo-housed bears are prone to exhibiting stereotypic behaviors, generally considered indicators of negative welfare. We explored the effects of a variable-time feeding enrichment schedule on behavioral indicators of welfare in four bear species at Cleveland Metroparks Zoo. We distributed the diets of eight bears in one of five enrichment items, for two consecutive days each, and monitored behavior throughout the day. In Experiment 1, we compared variable-time to fixed-time presentation of enrichment over two, 10-day periods. Overall, bears performed more exploratory behavior when enriched (p < 0.0001). Furthermore, variable-time enrichment was associated with a greater increase in exploratory behavior than fixed-time enrichment when compared to baseline (p < 0.001). Both fixed-time (p unadjusted <0.05, p adjusted = 0.07) and variable-schedule (p unadjusted <0.05, p adjusted = 0.09) enrichment were also associated with similar decreases in abnormal behavior compared to baseline. For Experiment 2, we tested habituation to enrichment over 30 days using multiple items and a semi-variable presentation schedule. Again during the enrichment period, bears exhibited increased exploratory behavior (p < 0.0001) and decreased abnormal behaviors compared to baseline (p unadjusted = 0.05, p adjusted = 0.09). We observed no habituation during the 30-day sustained enrichment period for these behaviors. Collectively, these results suggest that daily, variable-schedule feeding enrichment, with intermittent presentation of unique enrichment items, increases behavioral indicators of positive welfare and decreases behavioral indicators of negative welfare. © 2018 Wiley Periodicals, Inc.

  4. Using Multiple Schedules During Functional Communication Training to Promote Rapid Transfer of Treatment Effects

    PubMed Central

    Fisher, Wayne W.; Greer, Brian D.; Fuhrman, Ashley M.; Querim, Angie C.

    2016-01-01

    Multiple schedules with signaled periods of reinforcement and extinction have been used to thin reinforcement schedules during functional communication training (FCT) to make the intervention more practical for parents and teachers. We evaluated whether these signals would also facilitate rapid transfer of treatment effects from one setting to the next and from one therapist to the next. With two children, we conducted FCT in the context of mixed (baseline) and multiple (treatment) schedules introduced across settings or therapists using a multiple baseline design. Results indicated that when the multiple schedules were introduced, the functional communication response came under rapid discriminative control, and problem behavior remained at near-zero rates. We extended these findings with another individual by using a more traditional baseline in which problem behavior produced reinforcement. Results replicated those of the previous participants and showed rapid reductions in problem behavior when multiple schedules were implemented across settings. PMID:26384141

  5. Using multiple schedules during functional communication training to promote rapid transfer of treatment effects.

    PubMed

    Fisher, Wayne W; Greer, Brian D; Fuhrman, Ashley M; Querim, Angie C

    2015-12-01

    Multiple schedules with signaled periods of reinforcement and extinction have been used to thin reinforcement schedules during functional communication training (FCT) to make the intervention more practical for parents and teachers. We evaluated whether these signals would also facilitate rapid transfer of treatment effects across settings and therapists. With 2 children, we conducted FCT in the context of mixed (baseline) and multiple (treatment) schedules introduced across settings or therapists using a multiple baseline design. Results indicated that when the multiple schedules were introduced, the functional communication response came under rapid discriminative control, and problem behavior remained at near-zero rates. We extended these findings with another individual by using a more traditional baseline in which problem behavior produced reinforcement. Results replicated those of the previous participants and showed rapid reductions in problem behavior when multiple schedules were implemented across settings. © Society for the Experimental Analysis of Behavior.

  6. Self-Administered Cued Naming Therapy: A Single-Participant Investigation of a Computer-Based Therapy Program Replicated in Four Cases

    ERIC Educational Resources Information Center

    Ramsberger, Gail; Marie, Basem

    2007-01-01

    Purpose: This study examined the benefits of a self-administered, clinician-guided, computer-based, cued naming therapy. Results of intense and nonintense treatment schedules were compared. Method: A single-participant design with multiple baselines across behaviors and varied treatment intensity for 2 trained lists was replicated over 4…

  7. DSN Scheduling Engine

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Johnston, Mark; Wax, Allan; Chouinard, Caroline

    2008-01-01

    The DSN (Deep Space Network) Scheduling Engine targets all space missions that use DSN services. It allows clients to issue scheduling, conflict identification, conflict resolution, and status requests in XML over a Java Message Service interface. The scheduling requests may include new requirements that represent a set of tracks to be scheduled under some constraints. This program uses a heuristic local search to schedule a variety of schedule requirements, and is being infused into the Service Scheduling Assembly, a mixed-initiative scheduling application. The engine resolves conflicting schedules of resource allocation according to a range of existing and possible requirement specifications, including optional antennas; start of track and track duration ranges; periodic tracks; locks on track start, duration, and allocated antenna; MSPA (multiple spacecraft per aperture); arraying/VLBI (very long baseline interferometry)/delta DOR (differential one-way ranging); continuous tracks; segmented tracks; gap-to-track ratio; and override or block-out of requirements. The scheduling models now include conflict identification for SOA(start of activity), BOT (beginning of track), RFI (radio frequency interference), and equipment constraints. This software will search through all possible allocations while providing a best-effort solution at any time. The engine reschedules to accommodate individual emergency tracks in 0.2 second, and emergency antenna downtime in 0.2 second. The software handles doubling of one mission's track requests over one week (to 42 total) in 2.7 seconds. Further tests will be performed in the context of actual schedules.

  8. Geosynchronous platform definition study. Volume 4, Part 1: Traffic analysis and system requirements for the baseline traffic model

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The traffic analyses and system requirements data generated in the study resulted in the development of two traffic models; the baseline traffic model and the new traffic model. The baseline traffic model provides traceability between the numbers and types of geosynchronous missions considered in the study and the entire spectrum of missions foreseen in the total national space program. The information presented pertaining to the baseline traffic model includes: (1) definition of the baseline traffic model, including identification of specific geosynchronous missions and their payload delivery schedules through 1990; (2) Satellite location criteria, including the resulting distribution of the satellite population; (3) Geosynchronous orbit saturation analyses, including the effects of satellite physical proximity and potential electromagnetic interference; and (4) Platform system requirements analyses, including satellite and mission equipment descriptions, the options and limitations in grouping satellites, and on-orbit servicing criteria (both remotely controlled and man-attended).

  9. Multilayer Optimization of Heterogeneous Networks Using Grammatical Genetic Programming.

    PubMed

    Fenton, Michael; Lynch, David; Kucera, Stepan; Claussen, Holger; O'Neill, Michael

    2017-09-01

    Heterogeneous cellular networks are composed of macro cells (MCs) and small cells (SCs) in which all cells occupy the same bandwidth. Provision has been made under the third generation partnership project-long term evolution framework for enhanced intercell interference coordination (eICIC) between cell tiers. Expanding on previous works, this paper instruments grammatical genetic programming to evolve control heuristics for heterogeneous networks. Three aspects of the eICIC framework are addressed including setting SC powers and selection biases, MC duty cycles, and scheduling of user equipments (UEs) at SCs. The evolved heuristics yield minimum downlink rates three times higher than a baseline method, and twice that of a state-of-the-art benchmark. Furthermore, a greater number of UEs receive transmissions under the proposed scheme than in either the baseline or benchmark cases.

  10. Site support program plan for ICF Kaiser Hanford Company, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-10-01

    This document is the general administrative plan implemented by the Hanford Site contractor, ICF Kaiser Hanford Company. It describes the mission, administrative structure, projected staffing, to be provided by the contractor. The report breaks out the work responsibilities within the different units of the company, a baseline schedule for the different groups, and a cost summary for the different operating units.

  11. Advancing the sleep/wake schedule impacts the sleep of African-Americans more than European-Americans.

    PubMed

    Paech, Gemma M; Crowley, Stephanie J; Fogg, Louis F; Eastman, Charmane I

    2017-01-01

    There are differences in sleep duration between Blacks/African-Americans and Whites/European-Americans. Recently, we found differences between these ancestry groups in the circadian system, such as circadian period and the magnitude of phase shifts. Here we document the role of ancestry on sleep and cognitive performance before and after a 9-h advance in the sleep/wake schedule similar to flying east or having a large advance in sleep times due to shiftwork, both of which produce extreme circadian misalignment. Non-Hispanic African and European-Americans (N = 20 and 17 respectively, aged 21-43 years) were scheduled to four baseline days each with 8 h time in bed based on their habitual sleep schedule. This sleep/wake schedule was then advanced 9 h earlier for three days. Sleep was monitored using actigraphy. During the last two baseline/aligned days and the first two advanced/misaligned days, beginning 2 h after waking, cognitive performance was measured every 3 h using the Automated Neuropsychological Assessment Metrics (ANAM) test battery. Mixed model ANOVAs assessed the effects of ancestry (African-American or European-American) and condition (baseline/aligned or advanced/misaligned) on sleep and cognitive performance. There was decreased sleep and impaired performance in both ancestry groups during the advanced/misaligned days compared to the baseline/aligned days. In addition, African-Americans obtained less sleep than European-Americans, especially on the first two days of circadian misalignment. Cognitive performance did not differ between African-Americans and European-Americans during baseline days. During the two advanced/misaligned days, however, African-Americans tended to perform slightly worse compared to European-Americans, particularly at times corresponding to the end of the baseline sleep episodes. Advancing the sleep/wake schedule, creating extreme circadian misalignment, had a greater impact on the sleep of African-Americans than European-Americans. Ancestry differences in sleep appear to be exacerbated when the sleep/wake schedule is advanced, which may have implications for individuals undertaking shiftwork and transmeridian travel.

  12. Integration of safety engineering into a cost optimized development program.

    NASA Technical Reports Server (NTRS)

    Ball, L. W.

    1972-01-01

    A six-segment management model is presented, each segment of which represents a major area in a new product development program. The first segment of the model covers integration of specialist engineers into 'systems requirement definition' or the system engineering documentation process. The second covers preparation of five basic types of 'development program plans.' The third segment covers integration of system requirements, scheduling, and funding of specialist engineering activities into 'work breakdown structures,' 'cost accounts,' and 'work packages.' The fourth covers 'requirement communication' by line organizations. The fifth covers 'performance measurement' based on work package data. The sixth covers 'baseline requirements achievement tracking.'

  13. A Comparison of Escalating versus Fixed Reinforcement Schedules on Undergraduate Quiz Taking

    ERIC Educational Resources Information Center

    Mahoney, Amanda

    2017-01-01

    Drug abstinence studies indicate that escalating reinforcement schedules maintain abstinence for longer periods than fixed reinforcement schedules. The current study evaluated whether escalating reinforcement schedules would maintain more quiz taking than fixed reinforcement schedules. During baseline and for the control group, bonus points were…

  14. Development of OTM Syngas Process and Testing of Syngas Derived Ultra-clean Fuels in Diesel Engines and Fuel Cells

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E.T.; James P. Meagher; Prasad Apte

    2002-12-31

    This topical report summarizes work accomplished for the Program from November 1, 2001 to December 31, 2002 in the following task areas: Task 1: Materials Development; Task 2: Composite Development; Task 4: Reactor Design and Process Optimization; Task 8: Fuels and Engine Testing; 8.1 International Diesel Engine Program; 8.2 Nuvera Fuel Cell Program; and Task 10: Program Management. Major progress has been made towards developing high temperature, high performance, robust, oxygen transport elements. In addition, a novel reactor design has been proposed that co-produces hydrogen, lowers cost and improves system operability. Fuel and engine testing is progressing well, but wasmore » delayed somewhat due to the hiatus in program funding in 2002. The Nuvera fuel cell portion of the program was completed on schedule and delivered promising results regarding low emission fuels for transportation fuel cells. The evaluation of ultra-clean diesel fuels continues in single cylinder (SCTE) and multiple cylinder (MCTE) test rigs at International Truck and Engine. FT diesel and a BP oxygenate showed significant emissions reductions in comparison to baseline petroleum diesel fuels. Overall through the end of 2002 the program remains under budget, but behind schedule in some areas.« less

  15. Comprehensive Study of Acute Effects and Recovery After Concussion

    DTIC Science & Technology

    2015-10-01

    1 AD______________ AWARD NUMBER: W81XWH-14-1-0561 TITLE: Comprehensive Study of Acute Effects and Recovery After Concussion PRINCIPAL... Concussion 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Michael McCrea, PhD, ABPP 5d. PROJECT NUMBER Professor & Director of Brain Injury Research...course of 3 years, the project is progressing on schedule. We baseline tested 545 football athletes from July 13, 2015 to Aug 21, 2015. We enrolled

  16. Naval Enterprise Engineering: Design, Innovate and Train (NEEDIT)

    DTIC Science & Technology

    2015-03-04

    world and we are somewhat able to stand on the shoulders of giants in Naval Engineering and inherit baseline designs that, in most cases, represent a...Set-Based Design) maximizes design flexibility ( Lamb 2003). However, it may add some risk to schedule or require program managers to trust that the...spiral or Set based design. A design philosophy is a weighted list of attributes used in the evaluation of alternatives ( Lamb 2003). Design leadership

  17. Teaching children with autism to use photographic activity schedules: maintenance and generalization of complex response chains.

    PubMed Central

    MacDuff, G S; Krantz, P J; McClannahan, L E

    1993-01-01

    We used a graduated guidance procedure to teach 4 boys with autism to follow photographic activity schedules to increase on-task and on-schedule behavior. The multiple baseline across participants design included baseline, teaching, maintenance, resequencing of photographs, and generalization to novel photographs phases. The results indicated that photographic activity schedules (albums depicting after-school activities) produced sustained engagement, and skills generalized to a new sequence of photographs and to new photographs. The acquisition of schedule-following skills enabled these children with severe developmental disabilities to display lengthy response chains, independently change activities, and change activities in different group home settings in the absence of immediate supervision and prompts from others. PMID:8473261

  18. Design and Test of Fan/Nacelle Models Quiet High-Speed Fan

    NASA Technical Reports Server (NTRS)

    Miller, Christopher J. (Technical Monitor); Weir, Donald

    2003-01-01

    The Quiet High-Speed Fan program is a cooperative effort between Honeywell Engines & Systems (formerly AlliedSignal Engines & Systems) and the NASA Glenn Research Center. Engines & Systems has designed an advanced high-speed fan that will be tested on the Ultra High Bypass Propulsion Simulator in the NASA Glenn 9 x 15 foot wind tunnel, currently scheduled for the second quarter of 2000. An Engines & Systems modern fan design will be used as a baseline. A nacelle model is provided that is characteristic of a typical, modern regional aircraft nacelle and meets all of the program test objectives.

  19. Advancing the sleep/wake schedule impacts the sleep of African-Americans more than European-Americans

    PubMed Central

    Crowley, Stephanie J.; Fogg, Louis F.; Eastman, Charmane I.

    2017-01-01

    There are differences in sleep duration between Blacks/African-Americans and Whites/European-Americans. Recently, we found differences between these ancestry groups in the circadian system, such as circadian period and the magnitude of phase shifts. Here we document the role of ancestry on sleep and cognitive performance before and after a 9-h advance in the sleep/wake schedule similar to flying east or having a large advance in sleep times due to shiftwork, both of which produce extreme circadian misalignment. Non-Hispanic African and European-Americans (N = 20 and 17 respectively, aged 21–43 years) were scheduled to four baseline days each with 8 h time in bed based on their habitual sleep schedule. This sleep/wake schedule was then advanced 9 h earlier for three days. Sleep was monitored using actigraphy. During the last two baseline/aligned days and the first two advanced/misaligned days, beginning 2 h after waking, cognitive performance was measured every 3 h using the Automated Neuropsychological Assessment Metrics (ANAM) test battery. Mixed model ANOVAs assessed the effects of ancestry (African-American or European-American) and condition (baseline/aligned or advanced/misaligned) on sleep and cognitive performance. There was decreased sleep and impaired performance in both ancestry groups during the advanced/misaligned days compared to the baseline/aligned days. In addition, African-Americans obtained less sleep than European-Americans, especially on the first two days of circadian misalignment. Cognitive performance did not differ between African-Americans and European-Americans during baseline days. During the two advanced/misaligned days, however, African-Americans tended to perform slightly worse compared to European-Americans, particularly at times corresponding to the end of the baseline sleep episodes. Advancing the sleep/wake schedule, creating extreme circadian misalignment, had a greater impact on the sleep of African-Americans than European-Americans. Ancestry differences in sleep appear to be exacerbated when the sleep/wake schedule is advanced, which may have implications for individuals undertaking shiftwork and transmeridian travel. PMID:29059251

  20. Cost comparisons for the use of nonterrestrial materials in space manufacturing of large structures

    NASA Technical Reports Server (NTRS)

    Bock, E. H.; Risley, R. C.

    1979-01-01

    This paper presents results of a study sponsored by NASA to evaluate the relative merits of constructing solar power satellites (SPS) using resources obtained from the earth and from the moon. Three representative lunar resources utilization (LRU) concepts are developed and compared with a previously defined earth baseline concept. Economic assessment of the alternatives includes cost determination, economic threshold sensitivity to manufacturing cost variations, cost uncertainties, program funding schedule, and present value of costs. Results indicate that LRU for space construction is competitive with the earth baseline approach for a program requiring 100,000 metric tons per year of completed satellites. LRU can reduce earth-launched cargo requirements to less than 10% of that needed to build satellites exclusively from earth materials. LRU is potentially more cost-effective than earth-derived material utilization, due to significant reductions in both transportation and manufacturing costs. Because of uncertainties, cost-effectiveness cannot be ascertained with great confidence. The probability of LRU attaining a lower total program cost within the 30-year program appears to range from 57 to 93%.

  1. Are positive and negative reinforcement "different"? Insights from a free-operant differential outcomes effect.

    PubMed

    Magoon, Michael A; Critchfield, Thomas S; Merrill, Dustin; Newland, M Christopher; Schneider, W Joel

    2017-01-01

    Although theoretical discussions typically assume that positive and negative reinforcement differ, the literature contains little unambiguous evidence that they produce differential behavioral effects. To test whether the two types of consequences control behavior differently, we pitted money-gain positive reinforcement and money-loss-avoidance negative reinforcement, scheduled through identically programmed variable-cycle schedules, against each other in concurrent schedules. Contingencies of response-produced feedback, normally different in positive and negative reinforcement, were made symmetrical. Steeper matching slopes were produced compared to a baseline consisting of all positive reinforcement. This free-operant differential outcomes effect supports the notion that that stimulus-presentation positive reinforcement and stimulus-elimination negative reinforcement are functionally "different." However, a control experiment showed that the feedback asymmetry of more traditional positive and negative reinforcement schedules also is sufficient to create a "difference" when the type of consequence is held constant. We offer these findings as a small step in meeting the very large challenge of moving negative reinforcement theory beyond decades of relative quiescence. © 2017 Society for the Experimental Analysis of Behavior.

  2. A Mixed Integer Linear Program for Airport Departure Scheduling

    NASA Technical Reports Server (NTRS)

    Gupta, Gautam; Jung, Yoon Chul

    2009-01-01

    Aircraft departing from an airport are subject to numerous constraints while scheduling departure times. These constraints include wake-separation constraints for successive departures, miles-in-trail separation for aircraft bound for the same departure fixes, and time-window or prioritization constraints for individual flights. Besides these, emissions as well as increased fuel consumption due to inefficient scheduling need to be included. Addressing all the above constraints in a single framework while allowing for resequencing of the aircraft using runway queues is critical to the implementation of the Next Generation Air Transport System (NextGen) concepts. Prior work on airport departure scheduling has addressed some of the above. However, existing methods use pre-determined runway queues, and schedule aircraft from these departure queues. The source of such pre-determined queues is not explicit, and could potentially be a subjective controller input. Determining runway queues and scheduling within the same framework would potentially result in better scheduling. This paper presents a mixed integer linear program (MILP) for the departure-scheduling problem. The program takes as input the incoming sequence of aircraft for departure from a runway, along with their earliest departure times and an optional prioritization scheme based on time-window of departure for each aircraft. The program then assigns these aircraft to the available departure queues and schedules departure times, explicitly considering wake separation and departure fix restrictions to minimize total delay for all aircraft. The approach is generalized and can be used in a variety of situations, and allows for aircraft prioritization based on operational as well as environmental considerations. We present the MILP in the paper, along with benefits over the first-come-first-serve (FCFS) scheme for numerous randomized problems based on real-world settings. The MILP results in substantially reduced delays as compared to FCFS, and the magnitude of the savings depends on the queue and departure fix structure. The MILP assumes deterministic aircraft arrival times at the runway queues. However, due to taxi time uncertainty, aircraft might arrive either earlier or later than these deterministic times. Thus, to incorporate this uncertainty, we present a method for using the MILP with "overlap discounted rolling planning horizon". The approach is based on valuing near-term decision results more than future ones. We develop a model of taxitime uncertainty based on real-world data, and then compare the baseline FCFS delays with delays using the above MILP in a simple rolling-horizon method and in the overlap discounted scheme.

  3. SHARP's systems engineering challenge: rectifying integrated product team requirements with performance issues in an evolutionary spiral development acquisition

    NASA Astrophysics Data System (ADS)

    Kuehl, C. Stephen

    2003-08-01

    Completing its final development and early deployment on the Navy's multi-role aircraft, the F/A-18 E/F Super Hornet, the SHAred Reconnaissance Pod (SHARP) provides the war fighter with the latest digital tactical reconnaissance (TAC Recce) Electro-Optical/Infrared (EO/IR) sensor system. The SHARP program is an evolutionary acquisition that used a spiral development process across a prototype development phase tightly coupled into overlapping Engineering and Manufacturing Development (EMD) and Low Rate Initial Production (LRIP) phases. Under a tight budget environment with a highly compressed schedule, SHARP challenged traditional acquisition strategies and systems engineering (SE) processes. Adopting tailored state-of-the-art systems engineering process models allowd the SHARP program to overcome the technical knowledge transition challenges imposed by a compressed program schedule. The program's original goal was the deployment of digital TAC Recce mission capabilities to the fleet customer by summer of 2003. Hardware and software integration technical challenges resulted from requirements definition and analysis activities performed across a government-industry led Integrated Product Team (IPT) involving Navy engineering and test sites, Boeing, and RTSC-EPS (with its subcontracted hardware and government furnished equipment vendors). Requirements development from a bottoms-up approach was adopted using an electronic requirements capture environment to clarify and establish the SHARP EMD product baseline specifications as relevant technical data became available. Applying Earned-Value Management (EVM) against an Integrated Master Schedule (IMS) resulted in efficiently managing SE task assignments and product deliveries in a dynamically evolving customer requirements environment. Application of Six Sigma improvement methodologies resulted in the uncovering of root causes of errors in wiring interconnectivity drawings, pod manufacturing processes, and avionics requirements specifications. Utilizing the draft NAVAIR SE guideline handbook and the ANSI/EIA-632 standard: Processes for Engineering a System, a systems engineering tailored process approach was adopted for the accelerated SHARP EMD prgram. Tailoring SE processes in this accelerated product delivery environment provided unique opportunities to be technically creative in the establishment of a product performance baseline. This paper provides an historical overview of the systems engineering activities spanning the prototype phase through the EMD SHARP program phase, the performance requirement capture activities and refinement process challenges, and what SE process improvements can be applied to future SHARP-like programs adopting a compressed, evolutionary spiral development acquisition paradigm.

  4. Definition of experiments and instruments for a communication/navigation research laboratory. Volume 4: Programmatics

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Details are provided for scheduling, cost estimates, and support research and technology requirements for a space shuttle supported manned research laboratory to conduct selected communication and navigation experiments. A summary of the candidate program and its time phasing is included, as well as photographs of the 1/20 scale model of the shuttle supported Early Comm/Nav Research Lab showing the baseline, in-bay arrangement and the out-of-bay configuration.

  5. Star Scheduling Mode—A New Observing Strategy for Monitoring Weak Southern Radio Sources with the AuScope VLBI Array

    NASA Astrophysics Data System (ADS)

    McCallum, Lucia; Mayer, David; Le Bail, Karine; Schartner, Matthias; McCallum, Jamie; Lovell, Jim; Titov, Oleg; Shu, Fengchun; Gulyaev, Sergei

    2017-11-01

    The International Celestial Reference Frame suffers from significantly less observations in the southern hemisphere compared to the northern one. One reason for this is the historically low number of very long baseline interferometry radio telescopes in the south. The AuScope very long baseline interferometry array with three new telescopes on the Australian continent and an identical antenna in New Zealand were built to address this issue. While the overall number of observations in the south has greatly improved since then, a closer look reveals that this improvement is only true for strong radio sources (source flux densities >0.6 Jy). The new array of small very long baseline interferometry antennas has a relatively low baseline sensitivity so that only strong sources can be observed within a short integration time. A new observing strategy, the star scheduling mode, was developed to enable efficient observations of weak sources during geodetic sessions, through the addition of a single more sensitive antenna to the network. This scheduling mode was implemented in the Vienna very long baseline interferometry Software and applied in four 24-h sessions in 2016. These observations provide updated positions and source flux densities for 42 weak southern radio sources and significantly reduce the formal uncertainties for these sources. The star scheduling mode now allows the AuScope very long baseline interferometry array to undertake greater responsibility in monitoring sources in the southern sky, without significantly weakening the session for geodetic purposes.

  6. Associations between Culturally Relevant Recruitment Strategies and Participant Interest, Enrollment and Generalizability in a Weight-loss Intervention for African American Families.

    PubMed

    Huffman, Lauren E; Wilson, Dawn K; Kitzman-Ulrich, Heather; Lyerly, Jordan E; Gause, Haylee M; Resnicow, Ken

    2016-07-21

    Culturally relevant recruitment strategies may be an important approach for recruiting ethnic minorities for interventions. Previous research has examined associations between recruitment strategies and enrollment of African Americans (AA), but has not explored more deeply the role of incorporating sociocultural values into recruitment strategies. Our current study explores whether sociocultural recruitment mediums were associated with demographics, interest and enrollment in a weight-loss intervention. Sociocultural mediums included community partnerships, culturally relevant ads, sociocultural events, or word-of-mouth. Non-sociocultural mediums included community/school events that did not specifically target AAs. Analyses examined whether demographics of enrolled families differed by recruitment strategy and if recruitment strategy predicted scheduling a baseline visit, enrolling in a run-in phase, and enrolling in the intervention program. Families recruited from culturally relevant ads, sociocultural events, or word-of-mouth were 1.96 times more likely to schedule a baseline visit (OR=1.96, 95% CI=1.05, 3.68) than families recruited from non-sociocultural mediums. No differences were found for sociocultural mediums on enrolling in the run-in phase or the intervention. However, among enrolled families, those recruited from sociocultural mediums were less likely to be employed (X(2) [1, N=142] =5.53, P<.05) and more likely to have lower income (X(2) [1, N=142] =13.57, P<.05). Sociocultural mediums were associated with scheduling a baseline visit, but not enrollment. They were, however, effective in recruiting a more generalizable sample among enrolled participants based on demographic characteristics. Integrating sociocultural values into recruitment methods may be a valuable strategy for increasing interest in participation among underrepresented AA families.

  7. Report of the DOE Review Committee on the baseline validation of the Superconducting Super Collider

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-08-01

    The Secretary of Energy directed that an independent review of the current cost and schedule baseline for the SSC be conducted. The purpose of this independent review was to validate the current cost and schedule baseline and to ensure that the project status is accurate as currently reported. Through May 1993, approximately $1.5 billion of the baseline cost of $8.249 billion had been expended, with project completion forecasted on the baseline schedule as of September 1999. This report documents the findings of the SSC Baseline Validation Review Committee (the Committee). The report is organized into five parts. The first sectionmore » is the Executive Summary. This introduction is followed by a discussion of the project progress/status as determined by the Committee. The next section describes the Committee`s estimate of the cost at completion for the SSC project, followed by an assessment of the adequacy of the business management systems currently being used to manage the project. The final section presents the Committee`s conclusions and recommendations. The main body of the report is followed by the subcommittee reports and appendices.« less

  8. A rapid response air quality analysis system for use in projects having stringent quality assurance requirements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bowman, A.W.

    1990-04-01

    This paper describes an approach to solve air quality problems which frequently occur during iterations of the baseline change process. From a schedule standpoint, it is desirable to perform this evaluation in as short a time as possible while budgetary pressures limit the size of the staff available to do the work. Without a method in place to deal with baseline change proposal requests the environment analysts may not be able to produce the analysis results in the time frame expected. Using a concept called the Rapid Response Air Quality Analysis System (RAAS), the problems of timing and cost becomemore » tractable. The system could be adapted to assess other atmospheric pathway impacts, e.g., acoustics or visibility. The air quality analysis system used to perform the EA analysis (EA) for the Salt Repository Project (part of the Civilian Radioactive Waste Management Program), and later to evaluate the consequences of proposed baseline changes, consists of three components: Emission source data files; Emission rates contained in spreadsheets; Impact assessment model codes. The spreadsheets contain user-written codes (macros) that calculate emission rates from (1) emission source data (e.g., numbers and locations of sources, detailed operating schedules, and source specifications including horsepower, load factor, and duty cycle); (2) emission factors such as those published by the U.S. Environmental Protection Agency, and (3) control efficiencies.« less

  9. Some Determinants of Remote Behavioral History Effects in Humans

    ERIC Educational Resources Information Center

    Hirai, Mariko; Okouchi, Hiroto; Matsumoto, Akio; Lattal, Kennon A.

    2011-01-01

    Undergraduates were exposed to a series of reinforcement schedules: first, to a fixed-ratio (FR) schedule in the presence of one stimulus and to a differential-reinforcement-of-low-rate (DRL) schedule in the presence of another (multiple FR DRL training), then to a fixed-interval (FI) schedule in the presence of a third stimulus (FI baseline),…

  10. A VLBI variance-covariance analysis interactive computer program. M.S. Thesis

    NASA Technical Reports Server (NTRS)

    Bock, Y.

    1980-01-01

    An interactive computer program (in FORTRAN) for the variance covariance analysis of VLBI experiments is presented for use in experiment planning, simulation studies and optimal design problems. The interactive mode is especially suited to these types of analyses providing ease of operation as well as savings in time and cost. The geodetic parameters include baseline vector parameters and variations in polar motion and Earth rotation. A discussion of the theroy on which the program is based provides an overview of the VLBI process emphasizing the areas of interest to geodesy. Special emphasis is placed on the problem of determining correlations between simultaneous observations from a network of stations. A model suitable for covariance analyses is presented. Suggestions towards developing optimal observation schedules are included.

  11. Hardware test program for evaluation of baseline range-range rate sensor concept

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The baseline range/range rate sensor concept was evaluated. The Interrupted CW (ICW) mode of operation continued with emphasis on establishing the sensitivity of the video portion of the receiver was 7 dB less than the theoretical value. This departs from test results of previous implementations in which achieved sensitivity was within 1.5 to 2 dB of the theoretical value. Several potential causes of this discrepancy in performance were identified and are scheduled for further investigation. Results indicate that a cost savings in both per unit and program costs are realizable by eliminating one of the modes of operation. An acquisition (total program) cost savings of approximately 10% is projected by eliminating the CW mode of operation. The modified R/R sensor would operate in the ICW mode only and would provide coverage from initial acquisition at 12 nmi to within a few hundred feet of the OMV. If the ICW mode only were selected, then an accompanying sensor would be required to provide coverage from a few hundred feet to docking.

  12. SOFTCOST - DEEP SPACE NETWORK SOFTWARE COST MODEL

    NASA Technical Reports Server (NTRS)

    Tausworthe, R. C.

    1994-01-01

    The early-on estimation of required resources and a schedule for the development and maintenance of software is usually the least precise aspect of the software life cycle. However, it is desirable to make some sort of an orderly and rational attempt at estimation in order to plan and organize an implementation effort. The Software Cost Estimation Model program, SOFTCOST, was developed to provide a consistent automated resource and schedule model which is more formalized than the often used guesswork model based on experience, intuition, and luck. SOFTCOST was developed after the evaluation of a number of existing cost estimation programs indicated that there was a need for a cost estimation program with a wide range of application and adaptability to diverse kinds of software. SOFTCOST combines several software cost models found in the open literature into one comprehensive set of algorithms that compensate for nearly fifty implementation factors relative to size of the task, inherited baseline, organizational and system environment, and difficulty of the task. SOFTCOST produces mean and variance estimates of software size, implementation productivity, recommended staff level, probable duration, amount of computer resources required, and amount and cost of software documentation. Since the confidence level for a project using mean estimates is small, the user is given the opportunity to enter risk-biased values for effort, duration, and staffing, to achieve higher confidence levels. SOFTCOST then produces a PERT/CPM file with subtask efforts, durations, and precedences defined so as to produce the Work Breakdown Structure (WBS) and schedule having the asked-for overall effort and duration. The SOFTCOST program operates in an interactive environment prompting the user for all of the required input. The program builds the supporting PERT data base in a file for later report generation or revision. The PERT schedule and the WBS schedule may be printed and stored in a file for later use. The SOFTCOST program is written in Microsoft BASIC for interactive execution and has been implemented on an IBM PC-XT/AT operating MS-DOS 2.1 or higher with 256K bytes of memory. SOFTCOST was originally developed for the Zylog Z80 system running under CP/M in 1981. It was converted to run on the IBM PC XT/AT in 1986. SOFTCOST is a copyrighted work with all copyright vested in NASA.

  13. Effects of Differential Reinforcement and Rules With Feedback on Preference for Choice and Verbal Reports

    PubMed Central

    Karsina, Allen; Thompson, Rachel H; Rodriguez, Nicole M; Vanselow, Nicholas R

    2012-01-01

    We evaluated the effects of differential reinforcement and accurate verbal rules with feedback on the preference for choice and the verbal reports of 6 adults. Participants earned points on a probabilistic schedule by completing the terminal links of a concurrent-chains arrangement in a computer-based game of chance. In free-choice terminal links, participants selected 3 numbers from an 8-number array; in restricted-choice terminal links participants selected the order of 3 numbers preselected by a computer program. A pop-up box then informed the participants if the numbers they selected or ordered matched or did not match numbers generated by the computer but not displayed; matching in a trial resulted in one point earned. In baseline sessions, schedules of reinforcement were equal across free- and restricted-choice arrangements and a running tally of points earned was shown each trial. The effects of differentially reinforcing restricted-choice selections were evaluated using a reversal design. For 4 participants, the effects of providing a running tally of points won by arrangement and verbal rules regarding the schedule of reinforcement were also evaluated using a nonconcurrent multiple-baseline-across-participants design. Results varied across participants but generally demonstrated that (a) preference for choice corresponded more closely to verbal reports of the odds of winning than to reinforcement schedules, (b) rules and feedback were correlated with more accurate verbal reports, and (c) preference for choice corresponded more highly to the relative number of reinforcements obtained across free- and restricted-choice arrangements in a session than to the obtained probability of reinforcement or to verbal reports of the odds of winning. PMID:22754103

  14. Effects of differential reinforcement and rules with feedback on preference for choice and verbal reports.

    PubMed

    Karsina, Allen; Thompson, Rachel H; Rodriguez, Nicole M; Vanselow, Nicholas R

    2012-01-01

    We evaluated the effects of differential reinforcement and accurate verbal rules with feedback on the preference for choice and the verbal reports of 6 adults. Participants earned points on a probabilistic schedule by completing the terminal links of a concurrent-chains arrangement in a computer-based game of chance. In free-choice terminal links, participants selected 3 numbers from an 8-number array; in restricted-choice terminal links participants selected the order of 3 numbers preselected by a computer program. A pop-up box then informed the participants if the numbers they selected or ordered matched or did not match numbers generated by the computer but not displayed; matching in a trial resulted in one point earned. In baseline sessions, schedules of reinforcement were equal across free- and restricted-choice arrangements and a running tally of points earned was shown each trial. The effects of differentially reinforcing restricted-choice selections were evaluated using a reversal design. For 4 participants, the effects of providing a running tally of points won by arrangement and verbal rules regarding the schedule of reinforcement were also evaluated using a nonconcurrent multiple-baseline-across-participants design. Results varied across participants but generally demonstrated that (a) preference for choice corresponded more closely to verbal reports of the odds of winning than to reinforcement schedules, (b) rules and feedback were correlated with more accurate verbal reports, and (c) preference for choice corresponded more highly to the relative number of reinforcements obtained across free- and restricted-choice arrangements in a session than to the obtained probability of reinforcement or to verbal reports of the odds of winning.

  15. Evaluation of an Outpatient Rehabilitative Program to Address Mobility Limitations Among Older Adults

    PubMed Central

    Brown, Lorna G.; Ni, Meng; Schmidt, Catherine T.; Bean, Jonathan F.

    2017-01-01

    Abstract Live Long Walk Strong is a clinical demonstration program for community-dwelling older patients. It was designed to be consistent with current fall prevention guidelines and reimbursed under the Medicare model. Patients were screened within primary care and referred to a physiatrist followed by systematic assessment and treatment within an outpatient rehabilitative care setting. The treatment included behavioral modification, fall prevention education, community/home exercise integration, and exercise targeting strength, power, flexibility, balance, and endurance. Treatment duration and frequency varied with each patient based on baseline presentation, clinical judgment, and patient preference. Program feasibility and preliminary effectiveness were evaluated by assessing participation and changes in physical performance, respectively. There were 266 patients referred to the program, and 147 were willing to participate. Of these, 116 patients completed all scheduled visits (10.8 ± 3.9 visits). The noncompleters (n = 31) had a higher rate of falls in the previous 6 months and lower baseline Short Physical Performance Battery composite score. At the completion of care, the adjusted mean change in Short Physical Performance Battery was 1.66 units, surpassing a large clinically meaningful threshold (1 unit). The Live Long Walk Strong program appears to be feasible to implement and demonstrates preliminary effectiveness in enhancing mobility among older adults. PMID:28079616

  16. Operationally efficient propulsion system study (OEPSS) data book. Volume 9; Preliminary Development Plan for an Integrated Booster Propulsion Module (BPM)

    NASA Technical Reports Server (NTRS)

    DiBlasi, Angelo G.

    1992-01-01

    A preliminary development plan for an integrated propulsion module (IPM) is described. The IPM, similar to the Space Transportation Main engine (STME) engine, is applicable to the Advanced Launch System (ALS) baseline vehicle. The same STME development program ground rules and time schedule were assumed for the IPM. However, the unique advantages of testing an integrated engine element, in terms of reduced number of hardware and number of system and reliability tests, compared to single standalone engine and MPTA, are highlighted. The potential ability of the IPM to meet the ALS program goals for robustness, operability and reliability is emphasized.

  17. Scheduling: A guide for program managers

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.

  18. Response deprivation, reinforcement, and economics

    PubMed Central

    Allison, James

    1993-01-01

    Reinforcement of an instrumental response results not from a special kind of response consequence known as a reinforcer, but from a special kind of schedule known as a response-deprivation schedule. Under the requirements of a response-deprivation schedule, the baseline rate of the instrumental response permits less than the baseline rate of the contingent response. Because reinforcement occurs only if the schedule deprives the organism of the contingent response, reinforcement cannot result from any intrinsic property of the contingent response or any property relative to the instrumental response. Two typical effects of response-deprivation schedules—facilitation of the instrumental response and suppression of the contingent response—are discussed in terms of economic concepts and models of instrumental performance. It is suggested that response deprivation makes the contingent response function as an economic good, the instrumental response as currency. PMID:16812695

  19. Sleep and cognitive performance of African-Americans and European-Americans before and during circadian misalignment produced by an abrupt 9-h delay in the sleep/wake schedule

    PubMed Central

    Crowley, Stephanie J.; Eastman, Charmane I.

    2017-01-01

    We conducted two studies of circadian misalignment in non-Hispanic African and European-Americans. In the first, the sleep/wake (light/dark) schedule was advanced 9 h, similar to flying east, and in the second these schedules were delayed 9 h, similar to flying west or sleeping during the day after night work. We confirmed that the free-running circadian period is shorter in African-Americans compared to European-Americans, and found differences in the magnitude and direction of circadian rhythm phase shifts which were related to the circadian period. The sleep and cognitive performance data from the first study (published in this journal) documented the impairment in both ancestry groups due to this extreme circadian misalignment. African-Americans slept less and performed slightly worse during advanced/misaligned days than European-Americans. The current analysis is of sleep and cognitive performance from the second study. Participants were 23 African-Americans and 22 European-Americans (aged 18–44 years). Following four baseline days (8 h time in bed, based on habitual sleep), the sleep/wake schedule was delayed by 9 h for three days. Sleep was monitored using actigraphy. During the last two baseline/aligned days and the first two delayed/misaligned days, beginning 2 h after waking, cognitive performance was assessed every 3 h using the Automated Neuropsychological Assessment Metrics (ANAM) battery. Mixed model ANOVAs assessed the effects of ancestry (African-American or European-American) and condition (baseline/aligned or delayed/misaligned) on sleep and performance. There was decreased sleep and impaired cognitive performance in both ancestry groups during the two delayed/misaligned days relative to baseline/aligned days. Sleep and cognitive performance did not differ between African-Americans and European-Americans during either baseline/aligned or delayed/misaligned days. While our previous work showed that an advance in the sleep/wake schedule impaired the sleep of African-Americans more than European-Americans, delaying the sleep/wake schedule impaired the sleep and cognitive performance of African-Americans and European-Americans equally. PMID:29073187

  20. The role of response force on the persistence and structure of behavior during extinction.

    PubMed

    Pinkston, Jonathan W; Foss, Erica K

    2018-01-01

    Behavior Momentum Theory has emerged as a prominent account of resistance to change in both basic and applied research. Although laboratory studies often define precise, repeatable responses, application research often deals with response classes that may vary widely along a number of dimensions. In general, Behavior Momentum Theory has not addressed how response dimensions impact resistance to change, providing an opportunity to expand the model in new directions. Four rats pressed a force transducer under a multiple variable interval (VI) 60-s VI 60-s schedule of reinforcement. In one component, responses satisfied the schedule only if the response force fell within a "low" force band requirement; responses in the other schedule were required to satisfy a "high" force band. Once responding stabilized, extinction was programmed for three sessions. Then, the procedures were replicated. The results showed that response force came under discriminative control, but force requirements had no impact on resistance to extinction. In a follow-up condition, the schedule was changed to a multiple VI 30-s VI 120-s schedule and the low-force band operated in both components. The results showed that behavior maintained by the VI 30-s schedule was generally more resistant to extinction. A secondary analysis showed that force distributions created under baseline maintained during extinction. Overall, the results suggest that differential response force requirements prevailing in steady state do not affect the course of extinction. © 2018 Society for the Experimental Analysis of Behavior.

  1. Cost-effectiveness of rotavirus vaccination in peru.

    PubMed

    Clark, Andrew D; Walker, Damian G; Mosqueira, N Rocio; Penny, Mary E; Lanata, Claudio F; Fox-Rushby, Julia; Sanderson, Colin F B

    2009-11-01

    There are plans to introduce the oral rotavirus vaccine Rotarix (GlaxoSmithKline), 1 of 2 recently developed vaccines against rotavirus, in Peru. We modeled the cost-effectiveness of adding a rotavirus vaccine to the Peruvian immunization program under 3 scenarios for the timing of vaccination: (1) strictly according to schedule, at 2 and 4 months of age (on time); (2) distributed around the target ages in the same way as the actual timings in the program (flexible); and (3) flexible but assuming vaccination is not initiated for infants >12 weeks of age (restricted). We assumed an introductory price of US $7.50 per dose, and varied the annual rate of price decrease in sensitivity analyses. The discounted cost per disability-adjusted life-year averted for restricted, flexible, and on-time schedules was $621, $615, and $581, respectively. For each of the 3 scenarios, the percentage reduction in deaths due to rotavirus infection was 53%, 66%, and 69%, respectively. The cost per disability-adjusted life-year averted for alternative "what-if" scenarios ranged from $229 (assuming a 1-dose schedule, administered on time) to $1491 (assuming a 2-dose schedule, with half the baseline vaccine efficacy rates and a restricted timing policy). On the basis of current World Health Organization guidelines, rotavirus vaccination represents a highly cost-effective intervention in Peru. Withholding the vaccine from children who present for their first dose after 12 weeks of age would reduce the number of deaths averted by approximately 20%. A single dose may be more cost-effective than 2 doses, but more evidence on the protection conferred by a single dose is required.

  2. On program restructuring, scheduling, and communication for parallel processor systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Polychronopoulos, Constantine D.

    1986-08-01

    This dissertation discusses several software and hardware aspects of program execution on large-scale, high-performance parallel processor systems. The issues covered are program restructuring, partitioning, scheduling and interprocessor communication, synchronization, and hardware design issues of specialized units. All this work was performed focusing on a single goal: to maximize program speedup, or equivalently, to minimize parallel execution time. Parafrase, a Fortran restructuring compiler was used to transform programs in a parallel form and conduct experiments. Two new program restructuring techniques are presented, loop coalescing and subscript blocking. Compile-time and run-time scheduling schemes are covered extensively. Depending on the program construct, thesemore » algorithms generate optimal or near-optimal schedules. For the case of arbitrarily nested hybrid loops, two optimal scheduling algorithms for dynamic and static scheduling are presented. Simulation results are given for a new dynamic scheduling algorithm. The performance of this algorithm is compared to that of self-scheduling. Techniques for program partitioning and minimization of interprocessor communication for idealized program models and for real Fortran programs are also discussed. The close relationship between scheduling, interprocessor communication, and synchronization becomes apparent at several points in this work. Finally, the impact of various types of overhead on program speedup and experimental results are presented.« less

  3. Resistance to Extinction Following Variable-Interval Reinforcement: Reinforcer Rate and Amount

    ERIC Educational Resources Information Center

    Shull, Richard L.; Grimes, Julie A.

    2006-01-01

    Rats obtained food-pellet reinforcers by nose poking a lighted key. Experiment 1 examined resistance to extinction following single-schedule training with different variable-interval schedules, ranging from a mean interval of 16 min to 0.25 min. That is, for each schedule, the rats received 20 consecutive daily baseline sessions and then a session…

  4. Space station program phase B definition: Nuclear reactor-powered space station cost and schedules

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Tabulated data are presented on the costs, schedules, and technical characteristics for the space station phases C and D program. The work breakdown structure, schedule data, program ground rules, program costs, cost-estimating rationale, funding schedules, and supporting data are included.

  5. Optimizing Integrated Terminal Airspace Operations Under Uncertainty

    NASA Technical Reports Server (NTRS)

    Bosson, Christabelle; Xue, Min; Zelinski, Shannon

    2014-01-01

    In the terminal airspace, integrated departures and arrivals have the potential to increase operations efficiency. Recent research has developed geneticalgorithm- based schedulers for integrated arrival and departure operations under uncertainty. This paper presents an alternate method using a machine jobshop scheduling formulation to model the integrated airspace operations. A multistage stochastic programming approach is chosen to formulate the problem and candidate solutions are obtained by solving sample average approximation problems with finite sample size. Because approximate solutions are computed, the proposed algorithm incorporates the computation of statistical bounds to estimate the optimality of the candidate solutions. A proof-ofconcept study is conducted on a baseline implementation of a simple problem considering a fleet mix of 14 aircraft evolving in a model of the Los Angeles terminal airspace. A more thorough statistical analysis is also performed to evaluate the impact of the number of scenarios considered in the sampled problem. To handle extensive sampling computations, a multithreading technique is introduced.

  6. Geodetic VLBI observations at Simeiz station

    NASA Astrophysics Data System (ADS)

    Volvach, A.; Petrov, L.; Nesterov, N.

    Very long baseline interferometry (VLBI) observations under international geodetic programs are carried out at Simeiz station since June 1994. 22-m radiotelescope is equipped by dual-band S/X receivers, hydrogen maser CH-70 and data acquisition terminal Mark-IIIA. Observations are conducted by 24 hours sessions scheduled 6-15 times per year. Observational programs are a part of common efforts for maintenance of terrestrial reference frame, celestial reference frame and monitoring Earth orientation parameters carried out by international community under the auspices of International VLBI Service (IVS). Data are recorded on magnetic tapes which are shipped to correlator centers for further correlation and fringing. Fringed data are archived and are freely available via Internet for scientific analysis after 1-2 months after observations.

  7. Civilian Radioactive Waste Management System Requirements Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C.A. Kouts

    2006-05-10

    The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible formore » design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further defining system element functions, decomposing requirements into significantly greater detail, and developing designs of system components, facilities, and equipment. The CRD addresses the identification and control of functional, physical, and operational boundaries between and within CRWMS elements. The CRD establishes requirements regarding key interfaces between the CRWMS and elements external to the CRWMS. Project elements define interfaces between CRWMS program elements. The Program has developed a change management process consistent with DOE Order 413.3-Change 1. Changes to the Secretarial Acquisition Executive and Program-level baselines must be approved by a Program Baseline Change Control Board. Specific thresholds have been established for identifying technical, cost, and schedule changes that require approval. The CRWMS continually evaluates system design and operational concepts to optimize performance and/or cost. The Program has developed systems analysis tools to assess potential enhancements to the physical system and to determine the impacts from cost saving initiatives, scientific and technological improvements, and engineering developments. The results of systems analyses, if appropriate, are factored into revisions to the CRD as revised Programmatic Requirements.« less

  8. Cognitive decline in patients with Alzheimer's disease, vascular dementia and senile dementia of Lewy body type.

    PubMed

    Ballard, C; Patel, A; Oyebode, F; Wilcock, G

    1996-05-01

    One hundred and twenty-four patients with DSM-III-R dementia were assessed with a standardized battery which included the Geriatric Mental State Schedule, the History and Aetiology Schedule, the Secondary Dementia Schedule and the CAMCOG. Patients with Alzheimer's disease, vascular dementia and senile dementia of Lewy body type (SDLT) all had a similar degree of cognitive impairment at the time of the baseline interview. Patients with Alzheimer's disease and vascular dementia each experienced a mean decline of 27 points in patients with SDLT. Patients with SDLT had a significantly greater decline of verbal fluency than both the other groups. Women were significantly more impaired than men at the time of the baseline assessment but experienced a similar decline during the year of follow-up.

  9. GSDO PDR (Preliminary Design Review) Morning Meeting

    NASA Image and Video Library

    2014-03-20

    CAPE CANAVERAL, Fla. – Mike Bolger, program manager for the Ground Systems Development and Operations, or GSDO, Program speaks to participants during completion of the preliminary design review in the Mission Briefing Room inside the Operations and Checkout Building at NASA’s Kennedy Space Center in Florida. Representatives from NASA, its contractor partners and experts from across the aerospace industry met in the Mission Briefing Room inside the Operations and Checkout Building at NASA’s Kennedy Space Center in Florida to conclude the initial design and technology development phase. Completion of this review has validated that the baseline architecture is sound and aligns with the agency's exploration objectives. NASA is developing the Space Launch System and Orion spacecraft to provide an entirely new capability for human exploration beyond low-Earth orbit, with the flexibility to launch spacecraft for crew and cargo missions, including to an asteroid and Mars. Orion’s first unpiloted test flight is scheduled to launch later this year atop a Delta IV rocket. A second uncrewed flight test is scheduled for fiscal year 2018 on the Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Cory Huston

  10. Improving interprofessional competence in undergraduate students using a novel blended learning approach.

    PubMed

    Riesen, Eleanor; Morley, Michelle; Clendinneng, Debra; Ogilvie, Susan; Ann Murray, Mary

    2012-07-01

    Interprofessional simulation interventions, especially when face-to-face, involve considerable resources and require that all participants convene in a single location at a specific time. Scheduling multiple people across different programs is an important barrier to implementing interprofessional education interventions. This study explored a novel way to overcome the challenges associated with scheduling interprofessional learning experiences through the use of simulations in a virtual environment (Web.Alive™) where learners interact as avatars. In this study, 60 recent graduates from nursing, paramedic, police, and child and youth service programs participated in a 2-day workshop designed to improve interprofessional competencies through a blend of learning environments that included virtual face-to-face experiences, traditional face-to-face experiences and online experiences. Changes in learners' interprofessional competence were assessed through three outcomes: change in interprofessional attitudes pre- to post-workshop, self-perceived changes in interprofessional competence and observer ratings of performance across three clinical simulations. Results from the study indicate that from baseline to post-intervention, there was significant improvement in learners' interprofessional competence across all outcomes, and that the blended learning environment provided an acceptable way to develop these competencies.

  11. Toward creating family-friendly work environments in pediatrics: baseline data from pediatric department chairs and pediatric program directors.

    PubMed

    McPhillips, Heather A; Burke, Ann E; Sheppard, Kate; Pallant, Adam; Stapleton, F Bruder; Stanton, Bonita

    2007-03-01

    The objective was to determine baseline characteristics of pediatric residency training programs and academic departments in regard to family-friendly work environments as outlined in the Report of the Task Force on Women in Pediatrics. We conducted Web-based anonymous surveys of 147 pediatric department chairs and 203 pediatric program directors. The chair's questionnaire asked about child care, lactation facilities, family leave policies, work-life balance, and tenure and promotion policies. The program director's questionnaire asked about family leave, parenting, work-life balance, and perceptions of "family-friendliness." The response rate was 52% for program directors and 51% for chairs. Nearly 60% of chairs reported some access to child care or provided assistance locating child care; however, in half of these departments, demand almost always exceeded supply. Lactation facilities were available to breastfeeding faculty in 74% of departments, although only 57% provided access to breast pumps. A total of 78% of chairs and 90% of program directors reported written maternity leave policies with slightly fewer reporting paternity leave policies. The majority (83%) of chairs reported availability of part-time employment, whereas only 27% of program directors offered part-time residency options. Most departments offered some flexibility in promotion and tenure. Although progress has been made, change still is needed in many areas in pediatric departments and training programs, including better accessibility to quality child care; improved lactation facilities for breastfeeding mothers; clear, written parental leave policies; and flexible work schedules to accommodate changing demands of family life.

  12. An improved robust buffer allocation method for the project scheduling problem

    NASA Astrophysics Data System (ADS)

    Ghoddousi, Parviz; Ansari, Ramin; Makui, Ahmad

    2017-04-01

    Unpredictable uncertainties cause delays and additional costs for projects. Often, when using traditional approaches, the optimizing procedure of the baseline project plan fails and leads to delays. In this study, a two-stage multi-objective buffer allocation approach is applied for robust project scheduling. In the first stage, some decisions are made on buffer sizes and allocation to the project activities. A set of Pareto-optimal robust schedules is designed using the meta-heuristic non-dominated sorting genetic algorithm (NSGA-II) based on the decisions made in the buffer allocation step. In the second stage, the Pareto solutions are evaluated in terms of the deviation from the initial start time and due dates. The proposed approach was implemented on a real dam construction project. The outcomes indicated that the obtained buffered schedule reduces the cost of disruptions by 17.7% compared with the baseline plan, with an increase of about 0.3% in the project completion time.

  13. Very long baseline interferometry applied to polar motion, relativity, and geodesy. Ph. D. thesis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ma, C.

    1978-01-01

    The causes and effects of diurnal polar motion are described. An algorithm was developed for modeling the effects on very long baseline interferometry observables. A selection was made between two three-station networks for monitoring polar motion. The effects of scheduling and the number of sources observed on estimated baseline errors are discussed. New hardware and software techniques in very long baseline interferometry are described.

  14. Space station definition and preliminary design, WP-01. Volume 2: Results

    NASA Technical Reports Server (NTRS)

    Lenda, J. A.

    1987-01-01

    The basis for the studies and analyses which led to the results and conclusions documented and summarized, was the Engineering Master Schedule (EMS) generated by NASA and used as the controlling set of milestones and associated activities required to produce in a timely manner those products needed by all program participants in the establishment of an approved program baseline. The EMS consisted of twenty themes grouped into categories covering requirements, configurations, and strategies. A number of studies and analyses that were coordinated with the MSFC program and technical personnel as being needed to provide the requisite back-up material to satify the EMS were identified. These studies and analyses provided the data sufficient to support the conclusions and recommendations given to the MSFC in response to their EMS activity and to support the system level and conceptual design level approaches developed and reflected in the detailed sections of this document.

  15. Contribution of Schedule Delays to Cost Growth: How to Make Peace with a Marching Army

    NASA Technical Reports Server (NTRS)

    Majerowicz, Walt; Bitten, Robert; Emmons, Debra; Shinn, Stephen A.

    2016-01-01

    Numerous research papers have shown that cost and schedule growth are interrelated for NASA space science missions. Although there has shown to be a strong correlation of cost growth with schedule growth, it is unclear what percentage of cost growth is caused by schedule growth and how schedule growth can be controlled. This paper attempts to quantify this percentage by looking at historical data and show detailed examples of how schedule growth influences cost growth. The paper also addresses a methodology to show an alternate approach for assessing and setting a robust baseline schedule and use schedule performance metrics to help assess if the project is performing to plan. Finally, recommendations are presented to help control schedule growth in order to minimize cost growth for NASA space science missions.

  16. Payload crew training scheduler (PACTS) user's manual

    NASA Technical Reports Server (NTRS)

    Shipman, D. L.

    1980-01-01

    The operation of the payload specialist training scheduler (PACTS) is discussed in this user's manual which is used to schedule payload specialists for mission training on the Spacelab experiments. The PACTS program is a fully automated interactive, computerized scheduling program equipped with tutorial displays. The tutorial displays are sufficiently detailed for use by a program analyst having no computer experience. The PACTS program is designed to operate on the UNIVAC 1108 computer system, and has the capability to load output into a PDP 11/45 Interactive Graphics Display System for printing schedules. The program has the capacity to handle up to three overlapping Spacelab missions.

  17. Transfer of communication skills to the workplace: impact of a 38-hour communication skills training program designed for radiotherapy teams.

    PubMed

    Merckaert, Isabelle; Delevallez, France; Gibon, Anne-Sophie; Liénard, Aurore; Libert, Yves; Delvaux, Nicole; Marchal, Serge; Etienne, Anne-Marie; Bragard, Isabelle; Reynaert, Christine; Slachmuylder, Jean-Louis; Scalliet, Pierre; Van Houtte, Paul; Coucke, Philippe; Razavi, Darius

    2015-03-10

    This study assessed the efficacy of a 38-hour communication skills training program designed to train a multidisciplinary radiotherapy team. Four radiotherapy teams were randomly assigned to a training program or a waiting list. Assessments were scheduled at baseline and after training for the training group and at baseline and 4 months later for the waiting list group. Assessments included an audio recording of a radiotherapy planning session to assess team members' communication skills and expression of concerns of patients with breast cancer (analyzed with content analysis software) and an adapted European Organisation for Research and Treatment of Cancer satisfaction with care questionnaire completed by patients at the end of radiotherapy. Two hundred thirty-seven radiotherapy planning sessions were recorded. Compared with members of the untrained teams, members of the trained teams acquired, over time, more assessment skills (P = .003) and more supportive skills (P = .050) and provided more setting information (P = .010). Over time, patients interacting with members of the trained teams asked more open questions (P = .022), expressed more emotional words (P = .025), and exhibited a higher satisfaction level regarding nurses' interventions (P = .028). The 38-hour training program facilitated transfer of team member learned communication skills to the clinical practice and improved patients' satisfaction with care. © 2015 by American Society of Clinical Oncology.

  18. Effects of Modeling Versus Instructions on Sensitivity to Reinforcement Schedules

    ERIC Educational Resources Information Center

    Neef, Nancy A.; Marckel, Julie; Ferreri, Summer; Jung, Sunhwa; Nist, Lindsay; Armstrong, Nancy

    2004-01-01

    This study examined the effects of modeling versus instructions on the choices of 3 typically developing children and 3 children with attention deficit hyperactivity disorder (ADHD) whose academic responding showed insensitivity to reinforcement schedules. During baseline, students chose between successively presented pairs of mathematics problems…

  19. Operations mission planner beyond the baseline

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric; Cooper, Lynne

    1991-01-01

    The scheduling of Space Station Freedom must satisfy four major requirements. It must ensure efficient housekeeping operations, maximize the collection of science, respond to changes in tasking and available resources, and accommodate the above changes in a manner that minimizes disruption of the ongoing operations of the station. While meeting these requirements the scheduler must cope with the complexity, scope, and flexibility of SSF operations. This requires the scheduler to deal with an astronomical number of possible schedules. The Operations Mission Planner (OMP) is centered around minimally disruptive replanning and the use of heuristics limit search in scheduling. OMP has already shown several artificial intelligence based scheduling techniques such as Interleaved Iterative Refinement and Bottleneck Identification using Process Chronologies.

  20. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...) The degree to which the management process provides effective and integrated technical/schedule/cost... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Integrated Baseline...

  1. 48 CFR 1034.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... which the management process provides effective and integrated technical/schedule/cost planning and... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1034.202...

  2. Smoking cessation and its predictors: results from a community-based pharmacy tobacco cessation program in New Mexico.

    PubMed

    Khan, Nasreen; Anderson, Joe R; Du, Juan; Tinker, Dale; Bachyrycz, Amy M; Namdar, Rocsanna

    2012-09-01

    The New Mexico Pharmaceutical Care Foundation received funding through the Tobacco Use Prevention and Control Program (TUPAC) to provide support for pharmacist-delivered tobacco cessation services. The goal of the program was to increase the availability of tobacco cessation services to residents of New Mexico. Program outcomes are presented, using data from the first 2 fiscal years. To assess tobacco quit rates among smokers who participated in the community pharmacist-based program and identify the predictors of quitting at the end of a 6-month program. Pharmacists, who had received Rx for Change training, provided tobacco cessation services. Patients were scheduled for an initial visit and then were seen at regularly scheduled follow-up visits at 1 month, 3 months, and 6 months from the initial visit. Data collected at the initial visit included demographics, smoking history, and readiness for quitting. Smoking status was collected at each of the follow-up visits. Data were analyzed using SAS (SAS Institute) and STATA (StataCorp LP) statistical software. Tobacco quit rates were calculated at 1, 3, and 6 months. Multivariate regression analysis was performed to assess predictors of quitting. Standard errors were adjusted for repeated observation. Data were available for 346 participants. The average quit rate at the end of 6 months was 25%. Significant predictors of quitting were high confidence levels in quitting at baseline, individuals who had first cigarettes at least 30 minutes after waking up, first cessation attempt, and nonwhite patients. A smoking cessation program delivered through trained community pharmacists with prescriptive authority is an effective approach to reducing smoking. Further research should be conducted to compare the effectiveness of pharmacists with that of other providers of tobacco cessation services.

  3. Randomized trial of HPV4 vaccine assessing the response to HPV4 vaccine in two schedules among Peruvian female sex workers.

    PubMed

    Brown, Brandon; Blas, Magaly; Cabral, Alejandra; Carcamo, Cesar; Gravitt, Patti; Halsey, Neal

    2012-03-16

    Two hundred female sex workers (FSWs) in Lima, Peru were randomized to receive HPV4 vaccine in the standard (0, 2, 6 months) or a modified schedule (0, 3, 6 months). One hundred and eighty four (92%) participants completed 3 doses of vaccine. Baseline seropositive rates were 58% for HPV6, 22.5% for HPV11, 41.5% for HPV16, and 13% for HPV18. The final geometric mean antibody titer (GMT) following vaccination was significantly greater for women who were seropositive at baseline compared to seronegative women: HPV6 (GMT ratio=2.3, p<0.01), HPV11 (GMT ratio=2.7, p<0.01), HPV16 (GMT ratio=1.3, p=0.04), and HPV18 (GMT ratio=2.4, p<0.01). Antibody titers in the modified schedule were not inferior to those in the standard schedule, suggesting the modified schedule may be paired with required STD visits. Although all women benefit from vaccination, administration at a younger age and before sexual debut is needed to achieve maximum protection from vaccine. Copyright © 2012 Elsevier Ltd. All rights reserved.

  4. A Baseline Load Schedule for the Manual Calibration of a Force Balance

    NASA Technical Reports Server (NTRS)

    Ulbrich, N.; Gisler, R.

    2013-01-01

    A baseline load schedule for the manual calibration of a force balance was developed that takes current capabilities at the NASA Ames Balance Calibration Laboratory into account. The load schedule consists of 18 load series with a total of 194 data points. It was designed to satisfy six requirements: (i) positive and negative loadings should be applied for each load component; (ii) at least three loadings should be applied between 0 % and 100 % load capacity; (iii) normal and side force loadings should be applied at the forward gage location, the aft gage location, and the balance moment center; (iv) the balance should be used in UP and DOWN orientation to get axial force loadings; (v) the constant normal and side force approaches should be used to get the rolling moment loadings; (vi) rolling moment loadings should be obtained for 0, 90, 180, and 270 degrees balance orientation. Three different approaches are also reviewed that may be used to independently estimate the natural zeros of the balance. These three approaches provide gage output differences that may be used to estimate the weight of both the metric and non-metric part of the balance. Manual calibration data of NASA s MK29A balance and machine calibration data of NASA s MC60D balance are used to illustrate and evaluate different aspects of the proposed baseline load schedule design.

  5. Patient comprehension of an interactive, computer-based information program for cardiac catheterization: a comparison with standard information.

    PubMed

    Tait, Alan R; Voepel-Lewis, Terri; Moscucci, Mauro; Brennan-Martinez, Colleen M; Levine, Robert

    2009-11-09

    Several studies suggest that standard verbal and written consent information for treatment is often poorly understood by patients and their families. The present study examines the effect of an interactive computer-based information program on patients' understanding of cardiac catheterization. Adult patients scheduled to undergo diagnostic cardiac catheterization (n = 135) were randomized to receive details about the procedure using either standard institutional verbal and written information (SI) or interactive computerized information (ICI) preloaded on a laptop computer. Understanding was measured using semistructured interviews at baseline (ie, before information was given), immediately following cardiac catheterization (early understanding), and 2 weeks after the procedure (late understanding). The primary study outcome was the change from baseline to early understanding between groups. Subjects randomized to the ICI intervention had significantly greater improvement in understanding compared with those who received the SI (net change, 0.81; 95% confidence interval, 0.01-1.6). Significantly more subjects in the ICI group had complete understanding of the risks of cardiac catheterization (53.6% vs 23.1%) (P = .001) and options for treatment (63.2% vs 46.2%) (P = .048) compared with the SI group. Several predictors of improved understanding were identified, including baseline knowledge (P < .001), younger age (P = .002), and use of the ICI (P = .003). Results suggest that an interactive computer-based information program for cardiac catheterization may be more effective in improving patient understanding than conventional written consent information. This technology, therefore, holds promise as a means of presenting understandable detailed information regarding a variety of medical treatments and procedures.

  6. Evaluating a community-based early childhood education and development program in Indonesia: study protocol for a pragmatic cluster randomized controlled trial with supplementary matched control group

    PubMed Central

    2013-01-01

    Background This paper presents the study protocol for a pragmatic cluster randomized controlled trial (RCT) with a supplementary matched control group. The aim of the trial is to evaluate a community-based early education and development program launched by the Government of Indonesia. The program was developed in collaboration with the World Bank with a total budget of US$127.7 million, and targets an estimated 738,000 children aged 0 to 6 years living in approximately 6,000 poor communities. The aim of the program is to increase access to early childhood services with the secondary aim of improving school readiness. Methods/Design The study is being conducted across nine districts. The baseline survey contained 310 villages, of which 100 were originally allocated to the intervention arm, 20 originally allocated to a 9-month delay staggered start, 100 originally allocated to an 18-month delay staggered start and 90 allocated to a matched control group (no intervention). The study consists of two cohorts, one comprising children aged 12 to 23 months and the other comprising children aged 48 to 59 months at baseline. The data collection instruments include child observations and task/game-based assessments as well as a questionnaire suite, village head questionnaire, service level questionnaires, household questionnaire, and child caretaker questionnaire. The baseline survey was conducted from March to April 2009, midline was conducted from April to August 2010 and endline conducted early 2013. The resultant participation rates at both the district and village levels were 90%. At the child level, the participation rate was 99.92%. The retention rate at the child level at midline was 99.67%. Discussion This protocol paper provides a detailed record of the trial design including a discussion regarding difficulties faced with compliance to the randomization, compliance to the dispersion schedule of community block grants, and procurement delays for baseline and midline data collections. Considering the execution of the program and the resultant threats to the study, we discuss our analytical plan and intentions for endline data collection. Trials registration Current Controlled Trials ISRCTN76061874 PMID:23953975

  7. Evaluating a community-based early childhood education and development program in Indonesia: study protocol for a pragmatic cluster randomized controlled trial with supplementary matched control group.

    PubMed

    Pradhan, Menno; Brinkman, Sally A; Beatty, Amanda; Maika, Amelia; Satriawan, Elan; de Ree, Joppe; Hasan, Amer

    2013-08-16

    This paper presents the study protocol for a pragmatic cluster randomized controlled trial (RCT) with a supplementary matched control group. The aim of the trial is to evaluate a community-based early education and development program launched by the Government of Indonesia. The program was developed in collaboration with the World Bank with a total budget of US$127.7 million, and targets an estimated 738,000 children aged 0 to 6 years living in approximately 6,000 poor communities. The aim of the program is to increase access to early childhood services with the secondary aim of improving school readiness. The study is being conducted across nine districts. The baseline survey contained 310 villages, of which 100 were originally allocated to the intervention arm, 20 originally allocated to a 9-month delay staggered start, 100 originally allocated to an 18-month delay staggered start and 90 allocated to a matched control group (no intervention). The study consists of two cohorts, one comprising children aged 12 to 23 months and the other comprising children aged 48 to 59 months at baseline. The data collection instruments include child observations and task/game-based assessments as well as a questionnaire suite, village head questionnaire, service level questionnaires, household questionnaire, and child caretaker questionnaire. The baseline survey was conducted from March to April 2009, midline was conducted from April to August 2010 and endline conducted early 2013. The resultant participation rates at both the district and village levels were 90%. At the child level, the participation rate was 99.92%. The retention rate at the child level at midline was 99.67%. This protocol paper provides a detailed record of the trial design including a discussion regarding difficulties faced with compliance to the randomization, compliance to the dispersion schedule of community block grants, and procurement delays for baseline and midline data collections. Considering the execution of the program and the resultant threats to the study, we discuss our analytical plan and intentions for endline data collection. Current Controlled Trials ISRCTN76061874.

  8. Stress, anxiety, and depression among medical students in a multiethnic setting.

    PubMed

    Kulsoom, Bibi; Afsar, Nasir Ali

    2015-01-01

    Contemporary literature suggests that medical education might adversely affect students' mental health. Alfaisal University in Riyadh, Saudi Arabia is a developing institution; hence, there has been a concern regarding the mental well-being of the students. This study was designed to assess the traits of depression, anxiety, and stress among students in relation to potential underlying reasons. All 575 medical students across the 5 years of study participated by filling out the Depression, Anxiety, and Stress Scale-21 (DASS-21) questionnaire anonymously twice. Firstly, 2-3 weeks before a major examination (pre-examination), and secondly, during regular classes (post-examination). Correlation was sought regarding sex, year of scholarship, attendance of a premedical university preparatory program (UPP), housing, and smoking. Subjective comments from students were also obtained. A total of 76.8% and 74.9% of students participated in pre-and post-examination groups, respectively. The majority were the children of expatriate workers in Saudi Arabia, and included Arabs, South Asians, and North Americans. Prevalence of depression, anxiety, and stress was high (43%, 63%, and 41%, respectively) which reduced (to 30%, 47%, and 30%, respectively) to some extent after examinations. Saudis and those who had attended UPP had higher DASS-21 scores. Smoking and female sex predicted higher levels of "baseline" depression, anxiety, or stress. The students perceived the curriculum and schedule to be the primary causes of their high DASS-21 scores. The students had high "baseline" traits of depression, anxiety, and stress, and these were higher if an examination was near, especially among Saudis and those who had attended UPP. Smoking and female sex predicted higher levels of "baseline" depression, anxiety, or stress. Students suggested that study burden and a busy schedule were the major reasons for their high DASS-21 scores.

  9. Space shuttle maintenance program planning document

    NASA Technical Reports Server (NTRS)

    Brown, D. V.

    1972-01-01

    A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.

  10. 49 CFR 381.510 - May the FMCSA end a pilot program before its scheduled completion date?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false May the FMCSA end a pilot program before its scheduled completion date? 381.510 Section 381.510 Transportation Other Regulations Relating to... Pilot Programs § 381.510 May the FMCSA end a pilot program before its scheduled completion date? The...

  11. 49 CFR 381.510 - May the FMCSA end a pilot program before its scheduled completion date?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 5 2014-10-01 2014-10-01 false May the FMCSA end a pilot program before its scheduled completion date? 381.510 Section 381.510 Transportation Other Regulations Relating to... Pilot Programs § 381.510 May the FMCSA end a pilot program before its scheduled completion date? The...

  12. Implementation of a Posted Schedule to Increase Class-Wide Interobserver Agreement Assessment

    ERIC Educational Resources Information Center

    Doucette, Stefanie; DiGennaro Reed, Florence D.; Reed, Derek D.; Maguire, Helena; Marquardt, Heidi

    2012-01-01

    The present study investigated the impact of an antecedent intervention in the form of a daily posted schedule on the interobserver agreement (IOA) assessment of educational goals implemented within a classroom at a private school serving individuals with disabilities. During baseline, the percentage of academic goals with interobserver agreement…

  13. Assessing Weapon System Acquisition Cycle Times: Setting Program Schedules

    DTIC Science & Technology

    2015-06-01

    additional research, focused as follows: 1 . Acquisition schedule development: How are schedules for acquisition programs actually set and how are they...the germinating requirements documents specific to systems reviewed. A clear statement was found for only one system (Air and Missile Defense Radar...AMDR) when specific threat capabilities were projected to be operational. • Program schedule setting varies in rigor: 1 Up to the interim version of

  14. A sampling plan for conduit-flow karst springs: Minimizing sampling cost and maximizing statistical utility

    USGS Publications Warehouse

    Currens, J.C.

    1999-01-01

    Analytical data for nitrate and triazines from 566 samples collected over a 3-year period at Pleasant Grove Spring, Logan County, KY, were statistically analyzed to determine the minimum data set needed to calculate meaningful yearly averages for a conduit-flow karst spring. Results indicate that a biweekly sampling schedule augmented with bihourly samples from high-flow events will provide meaningful suspended-constituent and dissolved-constituent statistics. Unless collected over an extensive period of time, daily samples may not be representative and may also be autocorrelated. All high-flow events resulting in a significant deflection of a constituent from base-line concentrations should be sampled. Either the geometric mean or the flow-weighted average of the suspended constituents should be used. If automatic samplers are used, then they may be programmed to collect storm samples as frequently as every few minutes to provide details on the arrival time of constituents of interest. However, only samples collected bihourly should be used to calculate averages. By adopting a biweekly sampling schedule augmented with high-flow samples, the need to continuously monitor discharge, or to search for and analyze existing data to develop a statistically valid monitoring plan, is lessened.Analytical data for nitrate and triazines from 566 samples collected over a 3-year period at Pleasant Grove Spring, Logan County, KY, were statistically analyzed to determine the minimum data set needed to calculate meaningful yearly averages for a conduit-flow karst spring. Results indicate that a biweekly sampling schedule augmented with bihourly samples from high-flow events will provide meaningful suspended-constituent and dissolved-constituent statistics. Unless collected over an extensive period of time, daily samples may not be representative and may also be autocorrelated. All high-flow events resulting in a significant deflection of a constituent from base-line concentrations should be sampled. Either the geometric mean or the flow-weighted average of the suspended constituents should be used. If automatic samplers are used, then they may be programmed to collect storm samples as frequently as every few minutes to provide details on the arrival time of constituents of interest. However, only samples collected bihourly should be used to calculate averages. By adopting a biweekly sampling schedule augmented with high-flow samples, the need to continuously monitor discharge, or to search for and analyze existing data to develop a statistically valid monitoring plan, is lessened.

  15. Orbit transfer vehicle engine study, phase A extension. Volume 2A: Study results

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Engine trade studies and systems analyses leading to a baseline engine selection for advanced expander cycle engine are discussed with emphasis on: (1) performance optimization of advanced expander cycle engines in the 10 to 20K pound thrust range; (2) selection of a recommended advanced expander engine configuration based on maximized performance and minimized mission risk, and definition of the components for this configuration; (3) characterization of the low thrust adaptation requirements and performance for the staged combustion engine; (4) generation of a suggested safety and reliability approach for OTV engines independent of engine cycle; (5) definition of program risk relationships between expander and staged combustion cycle engines; and (6) development of schedules and costs for the DDT&E, production, and operation phases of the 10K pound thrust expander engine program.

  16. Composite Crew Module: Primary Structure

    NASA Technical Reports Server (NTRS)

    Kirsch, Michael T.

    2011-01-01

    In January 2007, the NASA Administrator and Associate Administrator for the Exploration Systems Mission Directorate chartered the NASA Engineering and Safety Center to design, build, and test a full-scale crew module primary structure, using carbon fiber reinforced epoxy based composite materials. The overall goal of the Composite Crew Module project was to develop a team from the NASA family with hands-on experience in composite design, manufacturing, and testing in anticipation of future space exploration systems being made of composite materials. The CCM project was planned to run concurrently with the Orion project's baseline metallic design within the Constellation Program so that features could be compared and discussed without inducing risk to the overall Program. This report discusses the project management aspects of the project including team organization, decision making, independent technical reviews, and cost and schedule management approach.

  17. 47 CFR 73.671 - Educational and informational programming for children.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., specials, PSAs, short-form programs, and regularly scheduled non-weekly programs with a significant purpose..., specials, PSAs, short-form programs, and regularly scheduled non-weekly programs with a significant purpose...

  18. SU-F-T-226: QA Management for a Large Institution with Multiple Campuses for FMEA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tang, G; Chan, M; Lovelock, D

    2016-06-15

    Purpose: To redesign our radiation therapy QA program with the goal to improve quality, efficiency, and consistency among a growing number of campuses at a large institution. Methods: A QA committee was established with at least one physicist representing each of our six campuses (22 linacs). Weekly meetings were scheduled to advise on and update current procedures, to review end-to-end and other test results, and to prepare composite reports for internal and external audits. QA procedures for treatment and imaging equipment were derived from TG Reports 142 and 66, practice guidelines, and feedback from ACR evaluations. The committee focused onmore » reaching a consensus on a single QA program among all campuses using the same type of equipment and reference data. Since the recommendations for tolerances referenced to baseline data were subject to interpretation in some instances, the committee reviewed the characteristics of all machines and quantified any variations before choosing between treatment planning system (i.e. treatment planning system commissioning data that is representative for all machines) or machine-specific values (i.e. commissioning data of the individual machines) as baseline data. Results: The configured QA program will be followed strictly by all campuses. Inventory of available equipment has been compiled, and additional equipment acquisitions for the QA program are made as needed. Dosimetric characteristics are evaluated for all machines using the same methods to ensure consistency of beam data where possible. In most cases, baseline data refer to treatment planning system commissioning data but machine-specific values are used as reference where it is deemed appropriate. Conclusion: With a uniform QA scheme, variations in QA procedures are kept to a minimum. With a centralized database, data collection and analysis are simplified. This program will facilitate uniformity in patient treatments and analysis of large amounts of QA data campus-wide, which will ultimately facilitate FMEA.« less

  19. Space station payload operations scheduling with ESP2

    NASA Technical Reports Server (NTRS)

    Stacy, Kenneth L.; Jaap, John P.

    1988-01-01

    The Mission Analysis Division of the Systems Analysis and Integration Laboratory at the Marshall Space Flight Center is developing a system of programs to handle all aspects of scheduling payload operations for Space Station. The Expert Scheduling Program (ESP2) is the heart of this system. The task of payload operations scheduling can be simply stated as positioning the payload activities in a mission so that they collect their desired data without interfering with other activities or violating mission constraints. ESP2 is an advanced version of the Experiment Scheduling Program (ESP) which was developed by the Mission Integration Branch beginning in 1979 to schedule Spacelab payload activities. The automatic scheduler in ESP2 is an expert system that embodies the rules that expert planners would use to schedule payload operations by hand. This scheduler uses depth-first searching, backtracking, and forward chaining techniques to place an activity so that constraints (such as crew, resources, and orbit opportunities) are not violated. It has an explanation facility to show why an activity was or was not scheduled at a certain time. The ESP2 user can also place the activities in the schedule manually. The program offers graphical assistance to the user and will advise when constraints are being violated. ESP2 also has an option to identify conflict introduced into an existing schedule by changes to payload requirements, mission constraints, and orbit opportunities.

  20. Effect of January vacations and prior night call status on resident ABSITE performance.

    PubMed

    Sugar, Jane G; Chu, Quyen D; Cole, Philip A; Li, Benjamin D L; Kim, Roger H

    2013-01-01

    To determine if vacations in January or on-call status have an effect on American Board of Surgery In-Training Examination (ABSITE) scores. Retrospective review of the performance of general surgery residents on ABSITE. Data collected included ABSITE scores, United States Medical Licensing Examination Step 2 scores, January vacation schedules, and call schedules. ABSITE performance was examined for correlation with vacation or call schedules. Student t test was used for statistical analysis, with a p value of less than 0.05 considered significant. General surgery residency program at the Louisiana State University Health Sciences Center-Shreveport, a university hospital-based program with 5 categorical residents per year. Postgraduate year (PGY) 1 through 5 general surgery categorical residents from 2006 to 2012. A total of 170 ABSITE scores from 55 residents were reviewed. The mean score when vacation was taken was 48.6 as compared with 36.3 when no vacation was taken (p = 0.02). Residents who took a January vacation at least once in their residency had a mean score of 42.8 as compared with 37.7 of those who did not (p = 0.43). The mean United States Medical Licensing Examination Step 2 score of residents who took a January vacation at least once in their residency was 218 as compared with 217 for their peers (p = 0.78). Among residents who took January vacations, the mean score in the years they took vacation was 49.4 as compared with 35.4 in the years they did not (p = 0.02). Prior night call status had no effect on the examination scores (44.2 vs 38.6, p = 0.30). Mean ABSITE scores were higher for residents who took a January vacation before the examination, despite no apparent difference in baseline test-taking ability. Among residents who took January vacations, mean scores were higher in the years they took vacation than in other years. On-call status did not have an effect on ABSITE performance. Vacation schedules in January can have a significant effect on ABSITE scores. Copyright © 2013 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  1. The effect of split sleep schedules (6h-on/6h-off) on neurobehavioural performance, sleep and sleepiness.

    PubMed

    Short, Michelle A; Centofanti, Stephanie; Hilditch, Cassie; Banks, Siobhan; Lushington, Kurt; Dorrian, Jillian

    2016-05-01

    Shorter, more frequent rosters, such as 6h-on/6h-off split shifts, may offer promise to sleep, subjective sleepiness and performance by limiting shift length and by offering opportunities for all workers to obtain some sleep across the biological night. However, there exists a paucity of studies that have examined these shifts using objective measures of sleep and performance. The present study examined neurobehavioural performance, sleepiness and sleep during 6h-on/6h-off split sleep schedules. Sixteen healthy adults (6 males, 26.13 y ± 4.46) participated in a 9-day laboratory study that included two baseline nights (BL, 10h time in bed (TIB), 2200 h-0800 h), 4 days on one of two types of 6h-on/6h-off split sleep schedules with 5h TIB during each 'off' period (6h early: TIB 0300 h-0800 h and 1500 h-20000 h, or 6-h late: TIB 0900 h-1400 h and 2100 h-0200 h), and two recovery nights (10h TIB per night, 2200 h-0800 h). Participants received 10h TIB per 24h in total across both shift schedules. A neurobehavioural test bout was completed every 2 h during wake, which included the Psychomotor Vigilance Task (PVT) and the Karolinska Sleepiness Scale (KSS). Linear mixed effects models were used to assess the effect of day (BL, shift days 1-4), schedule (6h early, 6h late) and trial (numbers 1-6) on PVT lapses (operationalised as the number of reaction times >500 ms), PVT total lapse time, PVT fastest 10% of reaction times and KSS. Analyses were also conducted examining the effect of day and schedule on sleep variables. Overall, PVT lapses and total lapse time did not differ significantly between baseline and shift days, however, peak response speeds were significantly slower on the first shift day when compared to baseline, but only for those in the 6h-late condition. Circadian variations were apparent in performance outcomes, with individuals in the 6h-late condition demonstrated significantly more and longer lapses and slower peak reaction times at the end of their night shift (0730 h) than at any other time during their shifts. In the 6h-early condition, only response speed significantly differed across trials, with slower response speeds occurring at trial 1 (0930 h) than in trials 3 (1330 h) or 4 (2130 h). While subjective sleepiness was higher on shift days than at baseline, sleepiness did not accumulate across days. Total sleep was reduced across split sleep schedules compared to baseline. Overall, these results show that while there was not a cumulative cost to performance across days of splitting sleep, participants obtained less sleep and reported lowered alertness on shift days. Tests near the circadian nadir showed higher sleepiness and increased performance deficits. While this schedule did not produce cumulative impairment, the performance deficits witnessed during the biological night are still of operational concern for industry and workers alike. Crown Copyright © 2015. Published by Elsevier Ltd. All rights reserved.

  2. Design definition of the Laser Atmospheric Wind Sounder (LAWS), phase 2. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The LAWS phase 1 and phase 2 studies have been completed on schedule and have led to significant advances in CO2 laser development. The Phase 2 Design Definition Study has shown that a large scanning mirror/high pulse energy laser LAWS Instrument is feasible and within the existing technology. The capability to monitor wind velocities with backscatter ratios of 10(exp 11) m(exp -1) SR(exp -1) is feasible. The weight budget allocated for the baseline LAWS is adequate, and sufficient reserves exist with the potential downsized configuration. With the possible decrease in available power from the baseline of 2.2 kW guideline, power and shot management is critical for the baseline configuration (15 to 20 J). This is particularly true during the 100 day occultation period each year. With the downsized configurations (5 to 7 J), power management is still necessary during the occultation but is primarily limited to shot management over the polar regions. The breadboard effort has produced significant laser advances for a tight 18 month schedule and the minimum budgets available from NASA, Lockheed, and TDS. Using the NASA funds and Lockheed and TDS fixed assets budgets, the breadboard was designed, fabricated, and brought on-line with first laser light within 16 months after ATP. First laser beam was obtained on 21 April 1992 at a 5 J power level. Tests since then have been conducted at sustained, repetitive pulse levels of over 7 J and 20 Hz. This is an increase of over two or three times greater than any system previously developed from this type laser. Increased power levels and additional life tests will be accomplished in the next LAWS phase. The Lockheed LAWS design will operate in the gravity gradient mode on-orbit, and all possible instrument vibration and jitter modes have been considered. Adequate pointing stability and control is state-of-the-art technology for the critical time periods, frequency rates, and control responses required by LAWS. Lockheed recommends a 6-1/2 year phase C/D program for LAWS to provide adequate feedback from the engineering unit and the qualification unit to the final flight unit. Assuming a one year period for LAWS integration to the spacecraft, followed by a six-month period for launch vehicle integration, LAWS could be successfully developed and launched in eight years. Our baseline design or downsized design can be accommodated by either the Atlas 2AS or the Delta launch vehicles. Lockheed's recommendation is that, based on the successful phase 2 design study and breadboard program, a follow-on 18 month extended breadboard testing program and additional system engineering studies, primarily in interfacing with a to be defined platform, be initiated. This should be immediately followed by the phase C/D program, leading to a LAWS launch in late 2001 or early 2002.

  3. 48 CFR 334.202 - Integrated Baseline Reviews (IBRs).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... rationale for a pre-award IBR, including an assessment of the impact on the source selection schedule and... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Integrated Baseline Reviews (IBRs). 334.202 Section 334.202 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES...

  4. 48 CFR 334.202 - Integrated Baseline Reviews (IBRs).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... rationale for a pre-award IBR, including an assessment of the impact on the source selection schedule and... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Integrated Baseline Reviews (IBRs). 334.202 Section 334.202 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES...

  5. 48 CFR 334.202 - Integrated Baseline Reviews (IBRs).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... rationale for a pre-award IBR, including an assessment of the impact on the source selection schedule and... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Integrated Baseline Reviews (IBRs). 334.202 Section 334.202 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES...

  6. 48 CFR 334.202 - Integrated Baseline Reviews (IBRs).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... rationale for a pre-award IBR, including an assessment of the impact on the source selection schedule and... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Integrated Baseline Reviews (IBRs). 334.202 Section 334.202 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES...

  7. 48 CFR 334.202 - Integrated Baseline Reviews (IBRs).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... rationale for a pre-award IBR, including an assessment of the impact on the source selection schedule and... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Integrated Baseline Reviews (IBRs). 334.202 Section 334.202 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES...

  8. A Baseline Load Schedule for the Manual Calibration of a Force Balance

    NASA Technical Reports Server (NTRS)

    Ulbrich, N.; Gisler, R.

    2013-01-01

    A baseline load schedule for the manual calibration of a force balance is defined that takes current capabilities at the NASA Ames Balance Calibration Laboratory into account. The chosen load schedule consists of 18 load series with a total of 194 data points. It was designed to satisfy six requirements: (i) positive and negative loadings should be applied for each load component; (ii) at least three loadings should be applied between 0 % and 100 % load capacity; (iii) normal and side force loadings should be applied at the forward gage location, aft gage location, and the balance moment center; (iv) the balance should be used in "up" and "down" orientation to get positive and negative axial force loadings; (v) the constant normal and side force approaches should be used to get the rolling moment loadings; (vi) rolling moment loadings should be obtained for 0, 90, 180, and 270 degrees balance orientation. In addition, three different approaches are discussed in the paper that may be used to independently estimate the natural zeros, i.e., the gage outputs of the absolute load datum of the balance. These three approaches provide gage output differences that can be used to estimate the weight of both the metric and non-metric part of the balance. Data from the calibration of a six-component force balance will be used in the final manuscript of the paper to illustrate characteristics of the proposed baseline load schedule.

  9. An Elegant Sufficiency: Load-Aware Differentiated Scheduling of Data Transfers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kettimuthu, Rajkumar; Vardoyan, Gayane; Agrawal, Gagan

    2015-11-15

    We investigate the file transfer scheduling problem, where transfers among different endpoints must be scheduled to maximize pertinent metrics. We propose two new algorithms that exploit the fact that the aggregate bandwidth obtained over a network or at a storage system tends to increase with the number of concurrent transfers—but only up to a certain limit. The first algorithm, SEAL, uses runtime information and data-driven models to approximate system load and adapt transfer schedules and concurrency so as to maximize performance while avoiding saturation. We implement this algorithm using GridFTP as the transfer protocol and evaluate it using real transfermore » logs in a production WAN environment. Results show that SEAL can improve average slowdowns and turnaround times by up to 25% and worst-case slowdown and turnaround times by up to 50%, compared with the best-performing baseline scheme. Our second algorithm, STEAL, further leverages user-supplied categorization of transfers as either “interactive” (requiring immediate processing) or “batch” (less time-critical). Results show that STEAL reduces the average slowdown of interactive transfers by 63% compared to the best-performing baseline and by 21% compared to SEAL. For batch transfers, compared to the best-performing baseline, STEAL improves by 18% the utilization of the bandwidth unused by interactive transfers. By elegantly ensuring a sufficient, but not excessive, allocation of concurrency to the right transfers, we significantly improve overall performance despite constraints.« less

  10. Improving Hospital-wide Patient Scheduling Decisions by Clinical Pathway Mining.

    PubMed

    Gartner, Daniel; Arnolds, Ines V; Nickel, Stefan

    2015-01-01

    Recent research has highlighted the need for solving hospital-wide patient scheduling problems. Inpatient scheduling, patient activities have to be scheduled on scarce hospital resources such that temporal relations between activities (e.g. for recovery times) are ensured. Common objectives are, among others, the minimization of the length of stay (LOS). In this paper, we consider a hospital-wide patient scheduling problem with LOS minimization based on uncertain clinical pathways. We approach the problem in three stages: First, we learn most likely clinical pathways using a sequential pattern mining approach. Second, we provide a mathematical model for patient scheduling and finally, we combine the two approaches. In an experimental study carried out using real-world data, we show that our approach outperforms baseline approaches on two metrics.

  11. Effects of Fixed-Time Reinforcement Delivered by Teachers for Reducing Problem Behavior in Special Education Classrooms

    ERIC Educational Resources Information Center

    Tomlin, Michelle; Reed, Phil

    2012-01-01

    The effects of fixed-time (FT) reinforcement schedules on the disruptive behavior of 4 students in special education classrooms were studied. Attention provided on FT schedules in the context of a multiple-baseline design across participants substantially decreased all students' challenging behavior. Disruptive behavior was maintained at levels…

  12. Treatment for Acquired Apraxia of Speech: Examination of Treatment Intensity and Practice Schedule

    ERIC Educational Resources Information Center

    Wambaugh, Julie L.; Nessler, Christina; Cameron, Rosalea; Mauszycki, Shannon C.

    2013-01-01

    Purpose: The authors designed this investigation to extend the development of a treatment for acquired apraxia of speech (AOS)--sound production treatment (SPT)--by examining the effects of 2 treatment intensities and 2 schedules of practice. Method: The authors used a multiple baseline design across participants and behaviors with 4 speakers with…

  13. Scheduling Nonconsumable Resources

    NASA Technical Reports Server (NTRS)

    Porta, Harry J.

    1990-01-01

    Users manual describes computer program SWITCH that schedules use of resources - by appliances switched on and off and use resources while they are on. Plans schedules according to predetermined goals; revises schedules when new goals imposed. Program works by depth-first searching with strict chronological back-tracking. Proceeds to evaluate alternatives as necessary, sometimes interacting with user.

  14. Fixed Schedules Can Support 21st-Century Skills

    ERIC Educational Resources Information Center

    Formanack, Gail; Pietsch, Laura

    2011-01-01

    The common belief among school librarians is that a flexibly scheduled school library program as opposed to a fixed schedule program is the best choice. After all, there are distinct advantages to the flexible program: students are served at the point of need, skills are not taught in isolation, and collaborative lessons are developed with…

  15. Use of computerized interview scheduling program for pediatric surgery match applicants.

    PubMed

    Stephens, Caroline Q; Hamilton, Nicholas A; Thompson, Ann E; Krishnaswami, Sanjay

    2017-06-01

    Pediatric surgery fellowship applicants and programs coordinate over 20 interviews per cycle. We hypothesized that replacing e-mail and phone communication with a computerized-scheduling program (CSP) could benefit both parties. We used a CSP to schedule 2016 interviews. Time to schedule and e-mail communication per applicant was compared to 2015, when traditional scheduling was used. Additionally, 2016 interviewees were surveyed about their experience with the CSP vs. traditional means. Analysis was performed using descriptive statistics and a Student's T-test. We found a significant decrease in mean scheduling time from 14.4 to 1.7h (p<0.001) and in e-mails exchanged from 3.4 to 1.0 (p<0.0001). Survey respondents reported 92% satisfaction with the CSP, and 87% found it easier to schedule interviews. Applicants also reported quicker finalization of interview dates (96%), improved access to interview slots (71%), and easier coordination of additional services and time off (63%). Notably, the mean longest time reported to schedule interviews using traditional methods was 7days (range 1-30). Overall, 84% supported widespread adoption of CSPs. Using CSPs improved the scheduling process for the significant majority of interviewees, and our program. If widely adopted, this could greatly improve the efficiency of pediatric surgery interview scheduling. N/A. Copyright © 2017 Elsevier Inc. All rights reserved.

  16. Baseline Preferences for Daily, Event-Driven, or Periodic HIV Pre-Exposure Prophylaxis among Gay and Bisexual Men in the PRELUDE Demonstration Project.

    PubMed

    Vaccher, Stefanie J; Gianacas, Christopher; Templeton, David J; Poynten, Isobel M; Haire, Bridget G; Ooi, Catriona; Foster, Rosalind; McNulty, Anna; Grulich, Andrew E; Zablotska, Iryna B

    2017-01-01

    The effectiveness of daily pre-exposure prophylaxis (PrEP) is well established. However, there has been increasing interest in non-daily dosing schedules among gay and bisexual men (GBM). This paper explores preferences for PrEP dosing schedules among GBM at baseline in the PRELUDE demonstration project. Individuals at high-risk of HIV were enrolled in a free PrEP demonstration project in New South Wales, Australia, between November 2014 and April 2016. At baseline, they completed an online survey containing detailed behavioural, demographic, and attitudinal questions, including their ideal way to take PrEP: daily (one pill taken every day), event-driven (pills taken only around specific risk events), or periodic (daily dosing during periods of increased risk). Overall, 315 GBM (98% of study sample) provided a preferred PrEP dosing schedule at baseline. One-third of GBM expressed a preference for non-daily PrEP dosing: 20% for event-driven PrEP, and 14% for periodic PrEP. Individuals with a trade/vocational qualification were more likely to prefer periodic to daily PrEP [adjusted odds ratio (aOR) = 4.58, 95% confidence intervals (95% CI): (1.68, 12.49)], compared to individuals whose highest level of education was high school. Having an HIV-positive main regular partner was associated with strong preference for daily, compared to event-driven PrEP [aOR = 0.20, 95% CI: (0.04, 0.87)]. Participants who rated themselves better at taking medications were more likely to prefer daily over periodic PrEP [aOR = 0.39, 95% CI: (0.20, 0.76)]. Individuals' preferences for PrEP schedules are associated with demographic and behavioural factors that may impact on their ability to access health services and information about PrEP and patterns of HIV risk. At the time of data collection, there were limited data available about the efficacy of non-daily PrEP schedules, and clinicians only recommended daily PrEP to study participants. Further research investigating how behaviours and PrEP preferences change correspondingly over time is needed. ClinicalTrials.gov NCT02206555. Registered 28 July 2014.

  17. Future Air Traffic Growth and Schedule Model, Supplement

    NASA Technical Reports Server (NTRS)

    Kimmel, William M. (Technical Monitor); Smith, Jeremy C.; Dollyhigh, Samuel M.

    2004-01-01

    The Future Air Traffic Growth and Schedule Model was developed as an implementation of the Fratar algorithm to project future traffic flow between airports in a system and of then scheduling the additional flights to reflect current passenger time-of-travel preferences. The methodology produces an unconstrained future schedule from a current (or baseline) schedule and the airport operations growth rates. As an example of the use of the model, future schedules are projected for 2010 and 2022 for all flights arriving at, departing from, or flying between all continental United States airports that had commercial scheduled service for May 17, 2002. Inter-continental US traffic and airports are included and the traffic is also grown with the Fratar methodology to account for their arrivals and departures to the continental US airports. Input data sets derived from the Official Airline Guide (OAG) data and FAA Terminal Area Forecast (TAF) are included in the examples of the computer code execution.

  18. Patient navigation to improve diabetes outpatient care at a safety-net hospital: a retrospective cohort study.

    PubMed

    Horný, Michal; Glover, Wiljeana; Gupte, Gouri; Saraswat, Aruna; Vimalananda, Varsha; Rosenzweig, James

    2017-11-21

    Recent emphasis on value based care and population management, such as Accountable Care Organizations in the United States, promote patient navigation to improve the quality of care and reduce costs. Evidence supporting the efficacy of patient navigation for chronic disease care is limited. The objective of this study was to evaluate the effect of a patient navigation program on medical and administrative outcomes among patients with diabetes in an urban, safety-net hospital clinic setting. A retrospective cohort study with pre- and post-intervention periods was conducted. Eligible patients were those with A1C ≥ 8.5% and at least one appointment no-show in the previous 12 months. The intervention and reference groups were balanced on observed characteristics and baseline outcome levels using propensity score matching. The effect of patient navigation was isolated using the difference-in-differences approach. Primary outcomes were A1C, low-density lipoprotein cholesterol, triglycerides, random urine microalbumin, the number of scheduled appointments, clinic visits, emergency visits, and inpatient stays, and the percentage of arrivals, cancellations, and no-shows to scheduled appointments. Of 797 eligible patients, 328 entered the navigation program. Matching reduced the sample size to 392 individuals (196 in each group). Patient navigation resulted in improved A1C (-1.1 percentage points; p < .001), more scheduled appointments (+ 5.3 per year; p < .001), more clinic visits (+6.4 per year; p < .001), more arrivals to scheduled appointments (+7.4 percentage points; p = .009) and fewer no-shows (-9.8 percentage points; p < .001). Navigation was associated with improved glycemic control and better clinic engagement among patients with diabetes. Further research is important to identify what features of navigation in diabetes care are critical to achieving success and to understand navigators' role in other settings.

  19. An Interactive Decision Support System for Scheduling Fighter Pilot Training

    DTIC Science & Technology

    2002-03-26

    Deitel , H.M. and Deitel , P.J. C: How to Program , 2nd ed., Prentice Hall, 1994. 8. Deitel , H.M. and Deitel , P.J. How to Program Java...Visual Basic Programming language, the Excel tool is modified in several ways. Scheduling Dispatch rules are implemented to automatically generate... programming language, the Excel tool was modified in several ways. Scheduling dispatch rules are implemented to automatically generate

  20. Cost Minimization for Joint Energy Management and Production Scheduling Using Particle Swarm Optimization

    NASA Astrophysics Data System (ADS)

    Shah, Rahul H.

    Production costs account for the largest share of the overall cost of manufacturing facilities. With the U.S. industrial sector becoming more and more competitive, manufacturers are looking for more cost and resource efficient working practices. Operations management and production planning have shown their capability to dramatically reduce manufacturing costs and increase system robustness. When implementing operations related decision making and planning, two fields that have shown to be most effective are maintenance and energy. Unfortunately, the current research that integrates both is limited. Additionally, these studies fail to consider parameter domains and optimization on joint energy and maintenance driven production planning. Accordingly, production planning methodology that considers maintenance and energy is investigated. Two models are presented to achieve well-rounded operating strategy. The first is a joint energy and maintenance production scheduling model. The second is a cost per part model considering maintenance, energy, and production. The proposed methodology will involve a Time-of-Use electricity demand response program, buffer and holding capacity, station reliability, production rate, station rated power, and more. In practice, the scheduling problem can be used to determine a joint energy, maintenance, and production schedule. Meanwhile, the cost per part model can be used to: (1) test the sensitivity of the obtained optimal production schedule and its corresponding savings by varying key production system parameters; and (2) to determine optimal system parameter combinations when using the joint energy, maintenance, and production planning model. Additionally, a factor analysis on the system parameters is conducted and the corresponding performance of the production schedule under variable parameter conditions, is evaluated. Also, parameter optimization guidelines that incorporate maintenance and energy parameter decision making in the production planning framework are discussed. A modified Particle Swarm Optimization solution technique is adopted to solve the proposed scheduling problem. The algorithm is described in detail and compared to Genetic Algorithm. Case studies are presented to illustrate the benefits of using the proposed model and the effectiveness of the Particle Swarm Optimization approach. Numerical Experiments are implemented and analyzed to test the effectiveness of the proposed model. The proposed scheduling strategy can achieve savings of around 19 to 27 % in cost per part when compared to the baseline scheduling scenarios. By optimizing key production system parameters from the cost per part model, the baseline scenarios can obtain around 20 to 35 % in savings for the cost per part. These savings further increase by 42 to 55 % when system parameter optimization is integrated with the proposed scheduling problem. Using this method, the most influential parameters on the cost per part are the rated power from production, the production rate, and the initial machine reliabilities. The modified Particle Swarm Optimization algorithm adopted allows greater diversity and exploration compared to Genetic Algorithm for the proposed joint model which results in it being more computationally efficient in determining the optimal scheduling. While Genetic Algorithm could achieve a solution quality of 2,279.63 at an expense of 2,300 seconds in computational effort. In comparison, the proposed Particle Swarm Optimization algorithm achieved a solution quality of 2,167.26 in less than half the computation effort which is required by Genetic Algorithm.

  1. VAXELN Experimentation: Programming a Real-Time Periodic Task Dispatcher Using VAXELN Ada 1.1

    DTIC Science & Technology

    1987-11-01

    synchronization to the SQM and VAXELN semaphores. Based on real-time scheduling theory, the optimal rate-monotonic scheduling algorithm [Lui 73...schedulability test based on the rate-monotonic algorithm , namely task-lumping [Sha 871, was necessary to cal- culate the theoretically expected schedulability...8217 Guide Digital Equipment Corporation, Maynard, MA, 1986. [Lui 73] Liu, C.L., Layland, J.W. Scheduling Algorithms for Multi-programming in a Hard-Real-Time

  2. Residency Training: Quality improvement projects in neurology residency and fellowship: applying DMAIC methodology.

    PubMed

    Kassardjian, Charles D; Williamson, Michelle L; van Buskirk, Dorothy J; Ernste, Floranne C; Hunderfund, Andrea N Leep

    2015-07-14

    Teaching quality improvement (QI) is a priority for residency and fellowship training programs. However, many medical trainees have had little exposure to QI methods. The purpose of this study is to review a rigorous and simple QI methodology (define, measure, analyze, improve, and control [DMAIC]) and demonstrate its use in a fellow-driven QI project aimed at reducing the number of delayed and canceled muscle biopsies at our institution. DMAIC was utilized. The project aim was to reduce the number of delayed muscle biopsies to 10% or less within 24 months. Baseline data were collected for 12 months. These data were analyzed to identify root causes for muscle biopsy delays and cancellations. Interventions were developed to address the most common root causes. Performance was then remeasured for 9 months. Baseline data were collected on 97 of 120 muscle biopsies during 2013. Twenty biopsies (20.6%) were delayed. The most common causes were scheduling too many tests on the same day and lack of fasting. Interventions aimed at patient education and biopsy scheduling were implemented. The effect was to reduce the number of delayed biopsies to 6.6% (6/91) over the next 9 months. Familiarity with QI methodologies such as DMAIC is helpful to ensure valid results and conclusions. Utilizing DMAIC, we were able to implement simple changes and significantly reduce the number of delayed muscle biopsies at our institution. © 2015 American Academy of Neurology.

  3. Coordination of Scheduling Clinical Externship or Clinical Practice Experiences for Students in Physical Therapy Educational Programs.

    ERIC Educational Resources Information Center

    Patterson, Robert K.; Kass, Susan H.

    A project to coordinate the scheduling of allied health occupations students for clinical practice or externship experiences in Southeast Florida is described. A model clinical facility utilization and time schedule matrix was developed for four programs: the physical therapy programs at Florida International University (FIU) and the University of…

  4. 76 FR 61351 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ... Trading LLC submits tariff filing per 35.1: DB Energy Trading LLC Rate Schedule FERC No. 1 Baseline Filing... Energy FERC Electric Tariff, Volume No. 1 Baseline to be effective 9/23/2011. Filed Date: 09/23/2011... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings 1 Take notice...

  5. Trade Study of Multiple Thruster Options for the Mars Airplane Concept

    NASA Technical Reports Server (NTRS)

    Kuhl, Christopher A.; Gayle, Steven W.; Hunter, Craig A.; Kenney, Patrick S.; Scola, Salvatore; Paddock, David A.; Wright, Henry S.; Gasbarre, Joseph F.

    2009-01-01

    A trade study was performed at NASA Langley Research Center under the Planetary Airplane Risk Reduction (PARR) project (2004-2005) to examine the option of using multiple, smaller thrusters in place of a single large thruster on the Mars airplane concept with the goal to reduce overall cost, schedule, and technical risk. The 5-lbf (22N) thruster is a common reaction control thruster on many satellites. Thousands of these types of thrusters have been built and flown on numerous programs, including MILSTAR and Intelsat VI. This study has examined the use of three 22N thrusters for the Mars airplane propulsion system and compared the results to those of the baseline single thruster system.

  6. Designing Control System Application Software for Change

    NASA Technical Reports Server (NTRS)

    Boulanger, Richard

    2001-01-01

    The Unified Modeling Language (UML) was used to design the Environmental Systems Test Stand (ESTS) control system software. The UML was chosen for its ability to facilitate a clear dialog between software designer and customer, from which requirements are discovered and documented in a manner which transposes directly to program objects. Applying the UML to control system software design has resulted in a baseline set of documents from which change and effort of that change can be accurately measured. As the Environmental Systems Test Stand evolves, accurate estimates of the time and effort required to change the control system software will be made. Accurate quantification of the cost of software change can be before implementation, improving schedule and budget accuracy.

  7. One year old and growing: a status report of the International Space Station and its partners

    NASA Technical Reports Server (NTRS)

    Bartoe, J. D.; Fortenberry, L.

    2000-01-01

    The International Space Station (ISS), as the largest international science and engineering program in history, features unprecedented technical, cost, scheduling, managerial, and international complexity. A number of major milestones have been accomplished to date, including the construction of major elements of flight hardware, the development of operations and sustaining engineering centers, astronaut training, and eight Space Shuttle/Mir docking missions. International partner contributions and levels of participation have been baselined, and negotiations and discussions are nearing completion regarding bartering arrangements for services and new hardware. As ISS is successfully executed, it can pave the way for more inspiring cooperative achievements in the future. Published by Elsevier Science Ltd.

  8. Investigation and evaluation of shuttle/GPS navigation system

    NASA Technical Reports Server (NTRS)

    Nilsen, P. W.

    1977-01-01

    Iterative procedures were used to analyze the performance of two preliminary shuttle/GPS navigation system configurations: an early OFT experimental system and a more sophisticated system which consolidates several separate navigation functions thus permitting net cost savings from decreased shuttle avionics weight and power consumption, and from reduced ground data processing. The GPS system can provide on-orbit navigation accuracy an order of magnitude better than the baseline system, with very adequate link margins. The worst-case link margin is 4.3 dB. This link margin accounts for shuttle RF circuit losses which were minimized under the constraints of program schedule and environmental limitations. Implicit in the link analyses are the location trade-offs for preamplifiers and antennas.

  9. Is it possible to improve radiotherapy team members' communication skills? A randomized study assessing the efficacy of a 38-h communication skills training program.

    PubMed

    Gibon, Anne-Sophie; Merckaert, Isabelle; Liénard, Aurore; Libert, Yves; Delvaux, Nicole; Marchal, Serge; Etienne, Anne-Marie; Reynaert, Christine; Slachmuylder, Jean-Louis; Scalliet, Pierre; Van Houtte, Paul; Coucke, Philippe; Salamon, Emile; Razavi, Darius

    2013-10-01

    Optimizing communication between radiotherapy team members and patients and between colleagues requires training. This study applies a randomized controlled design to assess the efficacy of a 38-h communication skills training program. Four radiotherapy teams were randomly assigned either to a training program or to a waiting list. Team members' communication skills and their self-efficacy to communicate in the context of an encounter with a simulated patient were the primary endpoints. These encounters were scheduled at the baseline and after training for the training group, and at the baseline and four months later for the waiting list group. Encounters were audiotaped and transcribed. Transcripts were analyzed with content analysis software (LaComm) and by an independent rater. Eighty team members were included in the study. Compared to untrained team members, trained team members used more turns of speech with content oriented toward available resources in the team (relative rate [RR]=1.38; p=0.023), more assessment utterances (RR=1.69; p<0.001), more empathy (RR=4.05; p=0.037), more negotiation (RR=2.34; p=0.021) and more emotional words (RR=1.32; p=0.030), and their self-efficacy to communicate increased (p=0.024 and p=0.008, respectively). The training program was effective in improving team members' communication skills and their self-efficacy to communicate in the context of an encounter with a simulated patient. Future study should assess the effect of this training program on communication with actual patients and their satisfaction. Moreover a cost-benefit analysis is needed, before implementing such an intensive training program on a broader scale. Copyright © 2013 Elsevier Ireland Ltd. All rights reserved.

  10. Quarterly Update: July-September 1990

    DTIC Science & Technology

    1990-09-01

    drafted a report that defines the process and the products of a feature oriented domain analysis ( FODA ) and provides a sample do- main analysis . This...receive ............... training to offer assessment services commercially. This section provides NASA adopted the rate monotonic scheduling analysis ...that the rate monotonic scheduling analysis approach will be the JulySeptember 1990 baseline methodology for its hard real-time operating system

  11. Immunogenicity of a three dose and five dose oral human rotavirus vaccine (RIX4414) schedule in south Indian infants.

    PubMed

    Kompithra, Rajeev Zachariah; Paul, Anu; Manoharan, Divya; Babji, Sudhir; Sarkar, Rajiv; Mathew, Leni G; Kang, Gagandeep

    2014-08-11

    This study was undertaken to compare the immunogenicity of a three dose and five dose schedule of an oral live-attenuated human rotavirus vaccine, Rotarix in south Indian infants. Healthy infants (N=90), six to seven weeks of age were enrolled to receive three doses (n=45) or five doses of Rotarix vaccine (n=45) along with other scheduled vaccines, each dose separated by a four week interval. Blood samples were taken before vaccination and one month post-dose three in the Rotarix three dose group and one month post-dose five in the Rotarix five dose group; all were tested for anti-rotavirus IgA by an antibody sandwich enzyme immunoassay. At baseline, >50% of infants had >20 units of anti-rotavirus IgA. The seroconversion rates after three and five doses were low and not significantly different in the two groups. However, among vaccine responders, children seropositive at baseline showed a much greater absolute increase in IgA antibody levels than children seronegative at baseline. Rotarix vaccine showed low immunogenicity in south Indian children and increasing the number of doses did not increase the proportion of infants seroconverting after vaccination. Copyright © 2014. Published by Elsevier Ltd.

  12. Comparing fixed-amount and progressive-amount DRO Schedules for tic suppression in youth with chronic tic disorders.

    PubMed

    Capriotti, Matthew R; Turkel, Jennifer E; Johnson, Rachel A; Espil, Flint M; Woods, Douglas W

    2017-01-01

    Chronic tic disorders (CTDs) involve motor and/or vocal tics that often cause substantial distress and impairment. Differential reinforcement of other behavior (DRO) schedules of reinforcement produce robust, but incomplete, reductions in tic frequency in youth with CTDs; however, a more robust reduction may be needed to affect durable clinical change. Standard, fixed-amount DRO schedules have not commonly yielded such reductions, so we evaluated a novel, progressive-amount DRO schedule, based on its ability to facilitate sustained abstinence from functionally similar behaviors. Five youth with CTDs were exposed to periods of baseline, fixed-amount DRO (DRO-F), and progressive-amount DRO (DRO-P). Both DRO schedules produced decreases in tic rate and increases in intertic interval duration, but no systematic differences were seen between the two schedules on any dimension of tic occurrence. The DRO-F schedule was generally preferred to the DRO-P schedule. Possible procedural improvements and other future directions are discussed. © 2016 Society for the Experimental Analysis of Behavior.

  13. Changed nursing scheduling for improved safety culture and working conditions - patients' and nurses' perspectives.

    PubMed

    Kullberg, Anna; Bergenmar, Mia; Sharp, Lena

    2016-05-01

    To evaluate fixed scheduling compared with self-scheduling for nursing staff in oncological inpatient care with regard to patient and staff outcomes. Various scheduling models have been tested to attract and retain nursing staff. Little is known about how these schedules affect staff and patients. Fixed scheduling and self-scheduling have been studied to a small extent, solely from a staff perspective. We implemented fixed scheduling on two of four oncological inpatient wards. Two wards kept self-scheduling. Through a quasi-experimental design, baseline and follow-up measurements were collected among staff and patients. The Safety Attitudes Questionnaire was used among staff, as well as study-specific questions for patients and staff. Fixed scheduling was associated with less overtime and fewer possibilities to change shifts. Self-scheduling was associated with more requests from management for short notice shift changes. The type of scheduling did not affect patient-reported outcomes. Fixed scheduling should be considered in order to lower overtime. Further research is necessary and should explore patient outcomes to a greater extent. Scheduling is a core task for nurse managers. Our study suggests fixed scheduling as a strategy for managers to improve the effective use of resources and safety. © 2016 John Wiley & Sons Ltd.

  14. The NARCONON drug education curriculum for high school students: a non-randomized, controlled prevention trial.

    PubMed

    Lennox, Richard D; Cecchini, Marie A

    2008-03-19

    An estimated 13 million youths aged 12 to 17 become involved with alcohol, tobacco and other drugs annually. The number of 12- to 17-year olds abusing controlled prescription drugs increased an alarming 212 percent between 1992 and 2003. For many youths, substance abuse precedes academic and health problems including lower grades, higher truancy, drop out decisions, delayed or damaged physical, cognitive, and emotional development, or a variety of other costly consequences. For thirty years the Narconon program has worked with schools and community groups providing single educational modules aimed at supplementing existing classroom-based prevention activities. In 2004, Narconon International developed a multi-module, universal prevention curriculum for high school ages based on drug abuse etiology, program quality management data, prevention theory and best practices. We review the curriculum and its rationale and test its ability to change drug use behavior, perceptions of risk/benefits, and general knowledge. After informed parental consent, approximately 1000 Oklahoma and Hawai'i high school students completed a modified Center for Substance Abuse Prevention (CSAP) Participant Outcome Measures for Discretionary Programs survey at three testing points: baseline, one month later, and six month follow-up. Schools assigned to experimental conditions scheduled the Narconon curriculum between the baseline and one-month follow-up test; schools in control conditions received drug education after the six-month follow-up. Student responses were analyzed controlling for baseline differences using analysis of covariance. At six month follow-up, youths who received the Narconon drug education curriculum showed reduced drug use compared with controls across all drug categories tested. The strongest effects were seen in all tobacco products and cigarette frequency followed by marijuana. There were also significant reductions measured for alcohol and amphetamines. The program also produced changes in knowledge, attitudes and perception of risk. The eight-module Narconon curriculum has thorough grounding in substance abuse etiology and prevention theory. Incorporating several historically successful prevention strategies this curriculum reduced drug use among youths.

  15. Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 6: Implementation schedule, development costs, operational costs, benefit assessment, impact on company organization, spin-off assessment, phase 1, tasks 3 to 8

    NASA Technical Reports Server (NTRS)

    Garrocq, C. A.; Hurley, M. J.; Dublin, M.

    1973-01-01

    A baseline implementation plan, including alternative implementation approaches for critical software elements and variants to the plan, was developed. The basic philosophy was aimed at: (1) a progressive release of capability for three major computing systems, (2) an end product that was a working tool, (3) giving participation to industry, government agencies, and universities, and (4) emphasizing the development of critical elements of the IPAD framework software. The results of these tasks indicate an IPAD first release capability 45 months after go-ahead, a five year total implementation schedule, and a total developmental cost of 2027 man-months and 1074 computer hours. Several areas of operational cost increases were identified mainly due to the impact of additional equipment needed and additional computer overhead. The benefits of an IPAD system were related mainly to potential savings in engineering man-hours, reduction of design-cycle calendar time, and indirect upgrading of product quality and performance.

  16. GSDO PDR (Preliminary Design Review) Morning Meeting

    NASA Image and Video Library

    2014-03-20

    CAPE CANAVERAL, Fla. – The Ground Systems Development and Operations, or GSDO, Program completed its preliminary design review which allows development of the ground systems to proceed to detailed design. Representatives from NASA, its contractor partners and experts from across the aerospace industry met in the Mission Briefing Room inside the Operations and Checkout Building at NASA’s Kennedy Space Center in Florida to conclude the initial design and technology development phase. Completion of this review has validated that the baseline architecture is sound and aligns with the agency's exploration objectives. NASA is developing the Space Launch System and Orion spacecraft to provide an entirely new capability for human exploration beyond low-Earth orbit, with the flexibility to launch spacecraft for crew and cargo missions, including to an asteroid and Mars. Orion’s first unpiloted test flight is scheduled to launch later this year atop a Delta IV rocket. A second uncrewed flight test is scheduled for fiscal year 2018 on the Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Cory Huston

  17. Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A) schedule plan

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This report describes Aerojet's methods and procedures used to control and administer contractual schedules for the EOS/AMSU-A program. Included are the following: the master, intermediate, and detail schedules; critical path analysis; and the total program logic network diagrams.

  18. Guidelines for successful self-scheduling on nursing units.

    PubMed

    Russell, Elizabeth; Hawkins, Jenna; Arnold, Kara A

    2012-09-01

    Self-scheduling programs are an increasingly popular strategy utilized by employers to address the individual and organizational challenges resulting from employee work-life imbalance among the nursing workforce. Certain key components will ensure buy-in and support from staff when self-scheduling programs are developed.

  19. X-43D Conceptual Design and Feasibility Study

    NASA Technical Reports Server (NTRS)

    Johnson, Donald B.; Robinson, Jeffrey S.

    2005-01-01

    NASA s Next Generation Launch Technology (NGLT) Program, in conjunction with the office of the Director of Defense Research and Engineering (DDR&E), developed an integrated hypersonic technology demonstration roadmap. This roadmap is an integral part of the National Aerospace Initiative (NAI), a multi-year, multi-agency cooperative effort to invest in and develop, among other things, hypersonic technologies. This roadmap contains key ground and flight demonstrations required along the path to developing a reusable hypersonic space access system. One of the key flight demonstrations required for systems that will operate in the high Mach number regime is the X-43D. As currently conceived, the X-43D is a Mach 15 flight test vehicle that incorporates a hydrogen-fueled scramjet engine. The purpose of the X-43D is to gather high Mach number flight environment and engine operability information which is difficult, if not impossible, to gather on the ground. During 2003, the NGLT Future Hypersonic Flight Demonstration Office initiated a feasibility study on the X-43D. The objective of the study was to develop a baseline conceptual design, assess its performance, and identify the key technical issues. The study also produced a baseline program plan, schedule, and cost, along with a list of key programmatic risks.

  20. Estimating the cost of major ongoing cost plus hardware development programs

    NASA Technical Reports Server (NTRS)

    Bush, J. C.

    1990-01-01

    Approaches are developed for forecasting the cost of major hardware development programs while these programs are in the design and development C/D phase. Three approaches are developed: a schedule assessment technique for bottom-line summary cost estimation, a detailed cost estimation approach, and an intermediate cost element analysis procedure. The schedule assessment technique was developed using historical cost/schedule performance data.

  1. A System for Automatically Generating Scheduling Heuristics

    NASA Technical Reports Server (NTRS)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  2. Task 2 Report: Algorithm Development and Performance Analysis

    DTIC Science & Technology

    1993-07-01

    separated peaks ............................................. 39 7-16 Example ILGC data for schedule 3 phosphites showing an analysis method which integrates...more closely follows the baseline ................. 40 7-18 Example R.GC data for schedule 3 phosphites showing an analysis method resulting in unwanted...much of the ambiguity that can arise in GC/MS with trace environmental samples, for example. Correlated chromatography, on the other hand, separates the

  3. Teaching Community Skills to Two Young Children with Autism Using a Digital Self-Managed Activity Schedule

    ERIC Educational Resources Information Center

    Cheung, Yvonne; Schulze, Kimberly A.; Leaf, Justin B.; Rudrud, Eric

    2016-01-01

    The current study investigated the efficacy of a self-managed activity schedule to teach 2 participants how to effectively order food items from a local community bakery. 2 participants who were on the autism spectrum were taught to follow a task analysis that was displayed on an iPhone. We used a multiple baseline design across participants to…

  4. Effective Schedule and Cost Management as a Product Development Lead

    NASA Technical Reports Server (NTRS)

    Simmons, Cynthia

    2015-01-01

    The presentation will be given at the 26th Annual Thermal Fluids Analysis Workshop (TFAWS 2015) hosted by the Goddard SpaceFlight Center (GSFC) Thermal Engineering Branch (Code 545). This course provides best practices, helpful tools and lessons learned for staying on plan and day-to-day management of Subsystem flight development after getting Project approval for your Subsystem schedule and budget baseline.

  5. Modified open-access scheduling for new patient evaluations at an academic chronic pain clinic increased patient access to care, but did not materially reduce their mean cancellation rate: A retrospective, observational study.

    PubMed

    Sivanesan, Eellan; Lubarsky, David A; Ranasinghe, Chaturani T; Sarantopoulos, Constantine D; Epstein, Richard H

    2017-09-01

    To determine if open-access scheduling would reduce the cancellation rate for new patient evaluations in a chronic pain clinic by at least 50%. Retrospective, observational study using electronic health records. Chronic pain clinic of an academic anesthesia department. All patients scheduled for evaluation or follow-up appointments in the chronic pain clinic between April 1, 2014, and December 31, 2015. Open-access scheduling was instituted in April 2015 with appointments offered on a date of the patient's choosing ≥1 business day after calling, with no limit on the daily number of new patients. Mean cancellation rates for new patients were compared between the 12-month baseline period prior to and for 7months after the change, following an intervening 2-month washout period. The method of batch means (by month) and the 2-sided Student t-test were used; P<0.01 required for significance. The new patient mean cancellation rate decreased from a baseline of 35.7% by 4.2% (95% confidence interval [CI] 1.4% to 6.9%; P=0.005); however, this failed to reach the 50% reduction target of 17.8%. Appointment lag time decreased by 4.7days (95% CI 2.3 to 7.0days, P<0.001) from 14.1days to 9.4days in the new patient group. More new patients were seen within 1week compared to baseline (50.6% versus 19.1%; P<0.0001). The mean number of new patient visits per month increased from 158.5 to 225.0 (P=0.0004). The cancellation rate and appointment lag times did not decrease for established patient visits, as expected because open-access scheduling was not implemented for this group. Access to care for new chronic pain patients improved with modified open-access scheduling. However, their mean cancellation rate only decreased from 35.7% to 31.5%, making this a marginally effective strategy to reduce cancellations. Copyright © 2017 Elsevier Inc. All rights reserved.

  6. College students as facilitators in reducing adolescent obesity disparity in Southern Appalachia: Team Up for Healthy Living

    PubMed Central

    Dalton, William T.; Dula, Taylor McKeehan; Southerland, Jodi; Wang, Liang; Littleton, Mary Ann; Mozen, Diana; Relyea, George; Schetzina, Karen; Lowe, Elizabeth F.; Stoots, James M.; Wu, Tiejian

    2015-01-01

    The proportion of obese adolescents in Southern Appalachia is among the highest in the nation. Through funding from the National Institute on Minority Health and Health Disparities – National Institutes of Health, the Team Up for Healthy Living project was a cluster-randomized trial targeting obesity prevention in adolescents through a cross-peer intervention. The specific aims of the project were to: 1) develop a peer-based health education program focusing on establishing positive peer norms towards healthy eating and physical activity (PA) among high school students, 2) test program efficacy, and 3) explore mechanisms underlying the program. The study was guided by the Theory of Planned Behavior, which presupposes that human behavior is primarily driven by attitude, subjective norms, perceived behavioral control, and social support. To deliver the intervention, undergraduate students from the disciplines of public health, nutrition, and kinesiology were hired as peer facilitators. Ten area high schools were invited to participate, were matched on demographics and then randomized to intervention or control. The primary outcomes of the study included body mass status, dietary behaviors, PA, and sedentary behaviors which were assessed at baseline and at three and twelve months post baseline. Intervention schools received Team Up for Healthy Living curriculum, which consists of eight 40-minute sessions. The curriculum focused on improving nutrition awareness, PA, leadership and communication. Control schools received their regularly scheduled Lifetime Wellness curriculum. The long-term goal of the study was to establish an effective academia–community partnership program to address adolescent obesity disparity in Southern Appalachia. PMID:25937506

  7. A Program Master Schedule Can Improve Results

    DTIC Science & Technology

    2014-02-01

    A Program Master Schedule Can Improve Results Patrick K. Barker “There cannot be a crisis today; my schedule is already full.” —Henry Kissinger...often necessary—for clear communication . However, over-reliance on eye-pleasing graphics risks projecting a false impression of SA over a dy- namic...for poor scheduling discipline, lack of believability and/or poor communication . As the saying goes, garbage in equals garbage out. On the other

  8. JCL Implementation On A Human Spaceflight Program

    NASA Technical Reports Server (NTRS)

    Kulpa, Vyga; Karpowich, Mike; Abel, Diana; Archiable, Wes; Carson, William

    2013-01-01

    Joint Confidence Level (JCL) analysis focuses on the integration of traditionally stove-piped programmatic components (schedule, cost and risk) to establish projected resource and schedule requirements at various confidence levels and to identify programmatic cost and schedule risk drivers. SLS Program consists of multiple Prime Contractors managed by independent SLS Elements which are integrated using SE&I and Program Management. SLS further integrates with GSDO and MPCV through ESD integrated working groups.

  9. Navy Occupational Health Information Management System (NOHIMS). Medical Exam Scheduling Module. Program Maintenance Manual

    DTIC Science & Technology

    1987-06-01

    NAVY OCCUPATIONAL HEALTH INFORMATION MANAGEMENT SYSTEM NOH I MS MEDICAL EXAM SCHEDULING MODULE PROGRAM MAINTENANCE MANUAL S JUNE 1987 DT11C 00... Information Management System (NOHIMS) ~ Medical Examination Scheduling (MES) Program Maintenance Manual 7. Author(s) 8. Performing Organization Rapt. No...the Navy Occupational Health Information Management System (NOHIMS). NOHIMS, whose initial version was developed at the Naval Health Research Center

  10. Future Air Traffic Growth and Schedule Model User's Guide

    NASA Technical Reports Server (NTRS)

    Kimmel, William M. (Technical Monitor); Smith, Jeremy C.; Dollyhigh, Samuel M.

    2004-01-01

    The Future Air Traffic Growth and Schedule Model was developed as an implementation of the Fratar algorithm to project future traffic flow between airports in a system and of then scheduling the additional flights to reflect current passenger time-of-travel preferences. The methodology produces an unconstrained future schedule from a current (or baseline) schedule and the airport operations growth rates. As an example of the use of the model, future schedules are projected for 2010 and 2022 for all flights arriving at, departing from, or flying between all continental United States airports that had commercial scheduled service for May 17, 2002. Inter-continental US traffic and airports are included and the traffic is also grown with the Fratar methodology to account for their arrivals and departures to the continental US airports. Input data sets derived from the Official Airline Guide (OAG) data and FAA Terminal Area Forecast (TAF) are included in the examples of the computer code execution.

  11. Evolutionary Scheduler for the Deep Space Network

    NASA Technical Reports Server (NTRS)

    Guillaume, Alexandre; Lee, Seungwon; Wang, Yeou-Fang; Zheng, Hua; Chau, Savio; Tung, Yu-Wen; Terrile, Richard J.; Hovden, Robert

    2010-01-01

    A computer program assists human schedulers in satisfying, to the maximum extent possible, competing demands from multiple spacecraft missions for utilization of the transmitting/receiving Earth stations of NASA s Deep Space Network. The program embodies a concept of optimal scheduling to attain multiple objectives in the presence of multiple constraints.

  12. Family risk as a predictor of initial engagement and follow-through in a universal nurse home visiting program to prevent child maltreatment.

    PubMed

    Alonso-Marsden, Shelley; Dodge, Kenneth A; O'Donnell, Karen J; Murphy, Robert A; Sato, Jeannine M; Christopoulos, Christina

    2013-08-01

    As nurse home visiting to prevent child maltreatment grows in popularity with both program administrators and legislators, it is important to understand engagement in such programs in order to improve their community-wide effects. This report examines family demographic and infant health risk factors that predict engagement and follow-through in a universal home-based maltreatment prevention program for new mothers in Durham County, North Carolina. Trained staff members attempted to schedule home visits for all new mothers during the birthing hospital stay, and then nurses completed scheduled visits three to five weeks later. Medical record data was used to identify family demographic and infant health risk factors for maltreatment. These variables were used to predict program engagement (scheduling a visit) and follow-through (completing a scheduled visit). Program staff members were successful in scheduling 78% of eligible families for a visit and completing 85% of scheduled visits. Overall, 66% of eligible families completed at least one visit. Structural equation modeling (SEM) analyses indicated that high demographic risk and low infant health risk were predictive of scheduling a visit. Both low demographic and infant health risk were predictive of visit completion. Findings suggest that while higher demographic risk increases families' initial engagement, it might also inhibit their follow-through. Additionally, parents of medically at-risk infants may be particularly difficult to engage in universal home visiting interventions. Implications for recruitment strategies of home visiting programs are discussed. Copyright © 2013 Elsevier Ltd. All rights reserved.

  13. Feasibility of the mobile mindfulness-based stress reduction for breast cancer (mMBSR(BC)) program for symptom improvement among breast cancer survivors.

    PubMed

    Lengacher, Cecile A; Reich, Richard R; Ramesar, Sophia; Alinat, Carissa B; Moscoso, Manolete; Cousin, Lakeshia; Marino, Victoria R; Elias, Maya N; Paterson, Carly L; Pleasant, Michelle L; Rodriguez, Carmen S; Wang, Hsiao-Lan; Kip, Kevin E; Meng, Hongdao; Park, Jong Y

    2018-02-01

    The purpose of this pilot study was to test the feasibility of delivering the mobile mindfulness-based stress reduction for breast cancer (mMBSR(BC)) program using an iPad and to evaluate its impact on symptom improvement. A single group, pre-posttest design was implemented among female stages 0-III breast cancer survivors (BCS) who completed treatment. Data were collected at baseline and week 6 on measures of psychological and physical symptoms and quality of life. The mMBSR(BC) program is a standardized, stress-reducing intervention that combines sitting and walking meditation, body scan, and yoga and is designed to deliver weekly 2-hour sessions for 6 weeks using an iPad. The mean age of the 15 enrolled BCS was 57 years; one participant was non-Hispanic black, and 14 were non-Hispanic white. Of the 13 who completed the study, there were significant improvements from baseline to 6 weeks post-mMBSR(BC) in psychological and physical symptoms of depression, state anxiety, stress, fear of recurrence, sleep quality, fatigue, and quality of life (P's < .05). Effect sizes for improvements of multiple symptoms ranged from medium to large. These results provide preliminary support that the mMBSR(BC) program may be feasible and acceptable, showing a clinical impact on decreasing psychological and physical symptoms. This mobile-based program offers a delivery of a standardized MBSR(BC) intervention to BCS that is convenient for their own schedule while decreasing symptom burden in the survivorship phase after treatment for breast cancer. Copyright © 2017 John Wiley & Sons, Ltd.

  14. Evaluation of a statewide dissemination and implementation of physical activity intervention in afterschool programs: a nonrandomized trial.

    PubMed

    Beets, Michael W; Glenn Weaver, R; Turner-McGrievy, Gabrielle; Saunders, Ruth P; Webster, Collin A; Moore, Justin B; Brazendale, Keith; Chandler, Jessica

    2017-12-01

    In 2015, YMCA-operated afterschool programs (ASPs) across South Carolina pledged to achieve the national standard that calls for every child to accumulate 30 min/day of moderate-to-vigorous physical activity (MVPA) during program time. This study shares the first-year findings related to the dissemination, implementation, and outcomes associated with the statewide intervention to achieve the MVPA Standard. Twenty ASPs were sampled from all YMCA-operated ASPs (N = 97) and visited at baseline (spring 2015) and first-year follow-up (spring 2016). Programs were provided standardized professional development training to increase the MVPA children accumulated while attending ASPs. The training focused on extending the scheduled time for activity opportunities and modifying commonly played games to increase MVPA. The RE-AIM framework was used to evaluate the statewide intervention. Accelerometer-derived MVPA was the primary outcome. Implementation was evaluated via direct observation. Intent-to-treat (ITT) and as-treated comparisons were conducted in summer 2016. Reach/adoption was variable, with attendance at trainings ranging from 0 to 100% across ASPs. Effectiveness of the intervention using ITT models indicated no changes from baseline in the percentage of programs meeting the MVPA standard for boys or girls. Implementation levels also varied and were related to increases in both boys' and girls' MVPA for moderate and high implementers. Findings indicate improvements in MVPA can be made from attending the trainings and implementing some or all of the training components. Additional work is necessary to identify ways to ensure staff attend trainings to implement strategies and to identify which specific factors contributed to increases in MVPA.

  15. Post Flight Reconditioning for US Astronauts Returning from the International Space Station

    NASA Technical Reports Server (NTRS)

    Nieschwitz, Bruce; Guilliams, Mark E.; Hoellen, David; Loehr, Jim

    2011-01-01

    Prior to spaceflight, each astronaut undergoes medical requirement testing to establish a preflight baseline for physiologic functions. Astronauts returning from the International Space Station can experience deficits in all or some of the following areas: aerobic capacity, muscular strength, power, endurance, stamina, bone, balance, agility, coordination, orthostatic tolerances, proprioception, neurovestibular function and flexibility. These losses occur from living in microgravity and are consistent with deficits seen in terrestrial, de-conditioning individuals. Since 2001, the Astronaut Strength, Conditioning and Rehabilitation (ASCR) specialists have administered a reconditioning program, focusing on all deficits, which improves the physical condition of all returning astronauts. In most cases, astronauts have reached or surpassed their preflight physical condition. Purpose: This presentation will describe and explain the postflight reconditioning program for returning astronauts. Methods: The postflight reconditioning program is designed to stress the body systems that affect the following: aerobic capacity, muscular strength, power, endurance, stamina, bone, balance, agility, coordination, orthostatic tolerances, proprioception, neurovestibular function and flexibility. Postflight reconditioning begins on landing day, is scheduled for two hours per day, 7 days a week for 45 days and is tailored to the specific needs of the astronaut. Initially the program focuses on basic ambulation, cardiovascular endurance, strength, balance, flexibility and proprioception. The program advances through 45 days and specific attention is given to each astronaut s overall condition, testing results, medical status, and assigned duties after their mission. Conclusion: Astronauts will experience noticeable deficits in their physical condition after living in microgravity for an extended length of time. After completing postflight reconditioning, it is shown that astronauts have regained, and in most cases improved upon, their preflight baseline condition.

  16. Developing optimal nurses work schedule using integer programming

    NASA Astrophysics Data System (ADS)

    Shahidin, Ainon Mardhiyah; Said, Mohd Syazwan Md; Said, Noor Hizwan Mohamad; Sazali, Noor Izatie Amaliena

    2017-08-01

    Time management is the art of arranging, organizing and scheduling one's time for the purpose of generating more effective work and productivity. Scheduling is the process of deciding how to commit resources between varieties of possible tasks. Thus, it is crucial for every organization to have a good work schedule for their staffs. The job of Ward nurses at hospitals runs for 24 hours every day. Therefore, nurses will be working using shift scheduling. This study is aimed to solve the nurse scheduling problem at an emergency ward of a private hospital. A 7-day work schedule for 7 consecutive weeks satisfying all the constraints set by the hospital will be developed using Integer Programming. The work schedule for the nurses obtained gives an optimal solution where all the constraints are being satisfied successfully.

  17. The effects of a childbirth psychoeducation program on learned resourcefulness, maternal role competence and perinatal depression: a quasi-experiment.

    PubMed

    Ngai, Fei-Wan; Chan, Sally Wai-Chi; Ip, Wan-Yim

    2009-10-01

    Learned resourcefulness plays a significant role in facilitating maternal coping during the transition to motherhood. Given the growing evidence of perinatal depression and the frequent feeling of incompetence in the maternal role, the implementation of an effective intervention to promote maternal role competence and emotional well-being is essential. To determine the impact of a childbirth psychoeducation program based on the concept of learned resourcefulness on maternal role competence and depressive symptoms in Chinese childbearing women. A pretest-posttest, control group quasi-experimental design with repeated measures was used. The study was conducted in two regional public hospitals in Hong Kong that provide routine childbirth education programs with similar content and structure. One hospital was being randomly selected as the experimental hospital. A convenience sample of 184 Chinese pregnant women attending the childbirth education was recruited between October 2005 and April 2007. Inclusion criteria were primiparous with singleton and uneventful pregnancy, at gestation between 12 and 35 weeks, and did not have a past or familial psychiatric illness. The intervention was a childbirth psychoeducation program that was incorporated into the routine childbirth education in the experimental hospital. The experimental group (n=92) received the childbirth psychoeducation program and the routine childbirth education. The comparison group (n=92) received the routine childbirth education alone in the comparison hospital. Outcomes were measured by the Self-Control Schedule, Parenting Sense of Competence Scale-Efficacy subscale and Edinburgh Postnatal Depression Scale at baseline, immediately post-intervention, at 6 weeks and 6 months postpartum. Analysis was by intention to treat. Women receiving the childbirth psychoeducation program had significant improvement in learned resourcefulness at 6 weeks postpartum (p=0.004) and an overall reduction in depressive symptoms (p=0.01) from baseline to 6 months postpartum compared with those who only received the routine childbirth education after adjusting for baseline group differences on age and social support. No significant group difference was found on maternal role competence. The childbirth psychoeducation program appears to be a very promising intervention for promoting learned resourcefulness and minimizing the risk of perinatal depression in first-time Chinese childbearing women. Future empirical work is required to determine the effectiveness of extending the childbirth psychoeducation program into the early postpartum for the promotion of maternal role competence in Chinese childbearing women.

  18. FASTER - A tool for DSN forecasting and scheduling

    NASA Technical Reports Server (NTRS)

    Werntz, David; Loyola, Steven; Zendejas, Silvino

    1993-01-01

    FASTER (Forecasting And Scheduling Tool for Earth-based Resources) is a suite of tools designed for forecasting and scheduling JPL's Deep Space Network (DSN). The DSN is a set of antennas and other associated resources that must be scheduled for satellite communications, astronomy, maintenance, and testing. FASTER consists of MS-Windows based programs that replace two existing programs (RALPH and PC4CAST). FASTER was designed to be more flexible, maintainable, and user friendly. FASTER makes heavy use of commercial software to allow for customization by users. FASTER implements scheduling as a two pass process: the first pass calculates a predictive profile of resource utilization; the second pass uses this information to calculate a cost function used in a dynamic programming optimization step. This information allows the scheduler to 'look ahead' at activities that are not as yet scheduled. FASTER has succeeded in allowing wider access to data and tools, reducing the amount of effort expended and increasing the quality of analysis.

  19. Project Planning and Reporting

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Project Planning Analysis and Reporting System (PPARS) is automated aid in monitoring and scheduling of activities within project. PPARS system consists of PPARS Batch Program, five preprocessor programs, and two post-processor programs. PPARS Batch program is full CPM (Critical Path Method) scheduling program with resource capabilities. Can process networks with up to 10,000 activities.

  20. Effects of GABA[subscript A] Modulators on the Repeated Acquisition of Response Sequences in Squirrel Monkeys

    ERIC Educational Resources Information Center

    Campbell, Una C.; Winsauer, Peter J.; Stevenson, Michael W.; Moerschbaecher, Joseph M.

    2004-01-01

    The present study investigated the effects of positive and negative GABA[subscript A] modulators under three different baselines of repeated acquisition in squirrel monkeys in which the monkeys acquired a three-response sequence on three keys under a second-order fixed-ratio (FR) schedule of food reinforcement. In two of these baselines, the…

  1. The Effects of Baseline Estimation on the Reliability, Validity, and Precision of CBM-R Growth Estimates

    ERIC Educational Resources Information Center

    Van Norman, Ethan R.; Christ, Theodore J.; Zopluoglu, Cengiz

    2013-01-01

    This study examined the effect of baseline estimation on the quality of trend estimates derived from Curriculum Based Measurement of Oral Reading (CBM-R) progress monitoring data. The authors used a linear mixed effects regression (LMER) model to simulate progress monitoring data for schedules ranging from 6-20 weeks for datasets with high and low…

  2. DORCA computer program. Volume 1: User's guide

    NASA Technical Reports Server (NTRS)

    Wray, S. T., Jr.

    1971-01-01

    The Dynamic Operational Requirements and Cost Analysis Program (DORCA) was written to provide a top level analysis tool for NASA. DORCA relies on a man-machine interaction to optimize results based on external criteria. DORCA relies heavily on outside sources to provide cost information and vehicle performance parameters as the program does not determine these quantities but rather uses them. Given data describing missions, vehicles, payloads, containers, space facilities, schedules, cost values and costing procedures, the program computes flight schedules, cargo manifests, vehicle fleet requirements, acquisition schedules and cost summaries. The program is designed to consider the Earth Orbit, Lunar, Interplanetary and Automated Satellite Programs. A general outline of the capabilities of the program are provided.

  3. Program and Abstracts of the Society for Research on Biological Rhythms (2nd) Held in Jacksonville, Florida on 9-13 May 1990

    DTIC Science & Technology

    1991-07-15

    4 Tram Schedule ................................................. 5 Amelia Island.................................................. 6 Program... Schedule .................................................. 7 Scientific Program.................................................. 8 Abstracts...and 5 4 -4- TRAM SCHEDULE 6" I Th)e Ameha Isand Tra-s 5 1 p taior, around teP I da-ly basis f~cn 6 1 5 a -MARSHSIDE Ia m Tra-T Stc-,S a’e -.E TRAM I

  4. Educational Services Directory, 2000-2001.

    ERIC Educational Resources Information Center

    Louisiana Public Broadcasting, Baton Rouge.

    Louisiana Public Broadcasting's (LPB's) Educational Services Directory presents an alphabetical listing of instructional television (ITV) program descriptions, a program schedule, and other educational services information. Sections in this Directory include: ITV Series Descriptions; ITV Broadcast Schedule; Program Content matrix; Going the…

  5. An ex ante control chart for project monitoring using earned duration management observations

    NASA Astrophysics Data System (ADS)

    Mortaji, Seyed Taha Hossein; Noori, Siamak; Noorossana, Rassoul; Bagherpour, Morteza

    2017-12-01

    In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project's performance indicators, by plotting them on the Shewhart-type control charts over time. However, these control charts are fundamentally designed for processes and ignore project-specific dynamics, which can lead to weak results and misleading interpretations. By paying close attention to the project baseline schedule and using statistical foundations, this paper proposes a new ex ante control chart which discriminates between acceptable (as-planned) and non-acceptable (not-as-planned) variations of the project's schedule performance. Such control chart enables project managers to set more realistic thresholds leading to a better decision making for taking corrective and/or preventive actions. For the sake of clarity, an illustrative example has been presented to show how the ex ante control chart is constructed in practice. Furthermore, an experimental investigation has been set up to analyze the performance of the proposed control chart. As expected, the results confirm that, when a project starts to deflect significantly from the project's baseline schedule, the ex ante control chart shows a respectable ability to detect and report right signals while avoiding false alarms.

  6. Remote effects of aversive contingencies: Disruption of appetitive behavior by adjacent avoidance sessions

    PubMed Central

    Hackenberg, Timothy D.; Hineline, Philip N.

    1987-01-01

    Disruption of ongoing appetitive behavior before and after daily avoidance sessions was examined. After baselines of appetitive responding were established under a fixed-interval 180-s schedule of food presentation, 4 rats were exposed to 40-min sessions of the appetitive schedule just prior to 100-min sessions of electric shock postponement, while another 4 rats received the 40-min appetitive sessions just following daily sessions of shock postponement. In all 8 subjects, fixed-interval response rates decreased relative to baseline levels, the effect being somewhat more pronounced when the avoidance sessions immediately followed. The disruption of fixed-interval responding was only partially reversed when avoidance sessions were discontinued. During the initial exposure to the avoidance sessions, patterns of responding under the fixed-interval schedule were differentially sensitive to disruption, with high baseline response rates generally more disturbed than low rates. These disruptions were not systematically related to changes in reinforcement frequency, which remained fairly high and invariant across all conditions of the experiment; they were also not systematically related to the response rates or to the shock rates of the adjacent avoidance sessions. The results, while qualitatively resembling patterns of conditioned suppression as typically studied, occurred on a greatly expanded time scale. As disruption of behavior extending over time, the present data suggest that some forms of conditioned suppression are perhaps best viewed within a larger temporal context. PMID:16812486

  7. Space Launch System milestone on This Week @NASA - August 29, 2014

    NASA Image and Video Library

    2014-08-29

    On August 27, NASA announced a milestone in development of the Space Launch System heavy-lift rocket. The completion of a rigorous review known as Key Decision Point C, or KDP-C, means NASA can transition from formulation to development of the rocket that will send humans beyond Earth orbit and to Mars. KDP-C outlines a conservative development cost baseline and a launch readiness schedule based on an initial SLS flight no later than November 2018. This marks the country's first commitment to building an exploration class launch vehicle since the Space Shuttle Program. Also, 3-D printed rocket injector test, SLS scale model test, Composite fuel tank tests, Crossing Neptune’s orbit, New Horizons: Continuing Voyager’s legacy and more!

  8. Goal programming for cyclical auxiliary police scheduling at UiTM Cawangan Perlis

    NASA Astrophysics Data System (ADS)

    Mustapar, Wasilatul Effah; Nasir, Diana Sirmayunie Mohd; Nor, Nor Azriani Mohamad; Abas, Sharifah Fhahriyah Syed

    2017-11-01

    Constructing a good and fair schedule for shift workers poses a great challenge as it requires a lot of time and effort. In this study, goal programming has been applied on scheduling to achieve the hard and soft constraints for a cyclical schedule that would ease the head of auxiliary police at building new schedules. To accomplish this goal, shift types were assigned in order to provide a fair schedule that takes into account the auxiliary police's policies and preferences. The model was run using Lingo software. Three out of four goals set for the study were achieved. In addition, the results considered an equal allocation for every auxiliary police, namely 70% for total duty and 30% for the day. Furthermore, the schedule was able to cyclically generate another 10 sets schedule. More importantly, the model has provided unbiased scheduling of auxiliary policies which led to high satisfaction in auxiliary police management.

  9. 77 FR 43084 - Multiple Award Schedule (MAS) Program Continuous Open Season-Operational Change

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    ... Award Schedule (MAS) Program Continuous Open Season- Operational Change AGENCY: Federal Acquisition... proposing this operational change to enhance the performance of and modernize the MAS program in three key program areas: Small business viability, operational efficiency, and cost control. The DBM will realign...

  10. Cost and schedule estimation study report

    NASA Technical Reports Server (NTRS)

    Condon, Steve; Regardie, Myrna; Stark, Mike; Waligora, Sharon

    1993-01-01

    This report describes the analysis performed and the findings of a study of the software development cost and schedule estimation models used by the Flight Dynamics Division (FDD), Goddard Space Flight Center. The study analyzes typical FDD projects, focusing primarily on those developed since 1982. The study reconfirms the standard SEL effort estimation model that is based on size adjusted for reuse; however, guidelines for the productivity and growth parameters in the baseline effort model have been updated. The study also produced a schedule prediction model based on empirical data that varies depending on application type. Models for the distribution of effort and schedule by life-cycle phase are also presented. Finally, this report explains how to use these models to plan SEL projects.

  11. Space communications scheduler: A rule-based approach to adaptive deadline scheduling

    NASA Technical Reports Server (NTRS)

    Straguzzi, Nicholas

    1990-01-01

    Job scheduling is a deceptively complex subfield of computer science. The highly combinatorial nature of the problem, which is NP-complete in nearly all cases, requires a scheduling program to intelligently transverse an immense search tree to create the best possible schedule in a minimal amount of time. In addition, the program must continually make adjustments to the initial schedule when faced with last-minute user requests, cancellations, unexpected device failures, quests, cancellations, unexpected device failures, etc. A good scheduler must be quick, flexible, and efficient, even at the expense of generating slightly less-than-optimal schedules. The Space Communication Scheduler (SCS) is an intelligent rule-based scheduling system. SCS is an adaptive deadline scheduler which allocates modular communications resources to meet an ordered set of user-specified job requests on board the NASA Space Station. SCS uses pattern matching techniques to detect potential conflicts through algorithmic and heuristic means. As a result, the system generates and maintains high density schedules without relying heavily on backtracking or blind search techniques. SCS is suitable for many common real-world applications.

  12. An Integrated Constraint Programming Approach to Scheduling Sports Leagues with Divisional and Round-robin Tournaments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carlsson, Mats; Johansson, Mikael; Larson, Jeffrey

    Previous approaches for scheduling a league with round-robin and divisional tournaments involved decomposing the problem into easier subproblems. This approach, used to schedule the top Swedish handball league Elitserien, reduces the problem complexity but can result in suboptimal schedules. This paper presents an integrated constraint programming model that allows to perform the scheduling in a single step. Particular attention is given to identifying implied and symmetry-breaking constraints that reduce the computational complexity significantly. The experimental evaluation of the integrated approach takes considerably less computational effort than the previous approach.

  13. Physician satisfaction with a multi-platform digital scheduling system

    PubMed Central

    Rocha, Leonardo Lima; Lima, Alex Heitor; Santiago, Caroline Reis Maia; Terra, Jose Cláudio Cyrineu; Dagan, Alon; Celi, Leo Anthony

    2017-01-01

    Objective Physician shift schedules are regularly created manually, using paper or a shared online spreadsheet. Mistakes are not unusual, leading to last minute scrambles to cover a shift. We developed a web-based shift scheduling system and a mobile application tool to facilitate both the monthly scheduling and shift exchanges between physicians. The primary objective was to compare physician satisfaction before and after the mobile application implementation. Methods Over a 9-month period, three surveys, using the 4-point Likert type scale were performed to assess the physician satisfaction. The first survey was conducted three months prior mobile application release, a second survey three months after implementation and the last survey six months after. Results 51 (77%) of the physicians answered the baseline survey. Of those, 32 (63%) were males with a mean age of 37.8 ± 5.5 years. Prior to the mobile application implementation, 36 (70%) of the responders were using more than one method to carry out shift exchanges and only 20 (40%) were using the official department report sheet to document shift exchanges. The second and third survey were answered by 48 (73%) physicians. Forty-eight (98%) of them found the mobile application easy or very easy to install and 47 (96%) did not want to go back to the previous method. Regarding physician satisfaction, at baseline 37% of the physicians were unsatisfied or very unsatisfied with shift scheduling. After the mobile application was implementation, only 4% reported being unsatisfied (OR = 0.11, p < 0.001). The satisfaction level improved from 63% to 96% between the first and the last survey. Satisfaction levels significantly increased between the three time points (OR = 13.33, p < 0.001). Conclusion Our web and mobile phone-based scheduling system resulted in better physician satisfaction. PMID:28328958

  14. Physical exercise accelerates reentrainment of human sleep-wake cycle but not of plasma melatonin rhythm to 8-h phase-advanced sleep schedule.

    PubMed

    Yamanaka, Yujiro; Hashimoto, Satoko; Tanahashi, Yusuke; Nishide, Shin-Ya; Honma, Sato; Honma, Ken-Ichi

    2010-03-01

    Effects of timed physical exercise were examined on the reentrainment of sleep-wake cycle and circadian rhythms to an 8-h phase-advanced sleep schedule. Seventeen male adults spent 12 days in a temporal isolation facility with dim light conditions (<10 lux). The sleep schedule was phase-advanced by 8 h from their habitual sleep times for 4 days, which was followed by a free-run session for 6 days, during which the subjects were deprived of time cues. During the shift schedule, the exercise group (n = 9) performed physical exercise with a bicycle ergometer in the early and middle waking period for 2 h each. The control group (n = 8) sat on a chair at those times. Their sleep-wake cycles were monitored every day by polysomnography and/or weight sensor equipped with a bed. The circadian rhythm in plasma melatonin was measured on the baseline day before phase shift: on the 4th day of shift schedule and the 5th day of free-run. As a result, the sleep-onset on the first day of free-run in the exercise group was significantly phase-advanced from that in the control and from the baseline. On the other hand, the circadian melatonin rhythm was significantly phase-delayed in the both groups, showing internal desynchronization of the circadian rhythms. The sleep-wake cycle resynchronized to the melatonin rhythm by either phase-advance or phase-delay shifts in the free-run session. These findings indicate that the reentrainment of the sleep-wake cycle to a phase-advanced schedule occurs independent of the circadian pacemaker and is accelerated by timed physical exercise.

  15. Physician satisfaction with a multi-platform digital scheduling system.

    PubMed

    Deliberato, Rodrigo Octávio; Rocha, Leonardo Lima; Lima, Alex Heitor; Santiago, Caroline Reis Maia; Terra, Jose Cláudio Cyrineu; Dagan, Alon; Celi, Leo Anthony

    2017-01-01

    Physician shift schedules are regularly created manually, using paper or a shared online spreadsheet. Mistakes are not unusual, leading to last minute scrambles to cover a shift. We developed a web-based shift scheduling system and a mobile application tool to facilitate both the monthly scheduling and shift exchanges between physicians. The primary objective was to compare physician satisfaction before and after the mobile application implementation. Over a 9-month period, three surveys, using the 4-point Likert type scale were performed to assess the physician satisfaction. The first survey was conducted three months prior mobile application release, a second survey three months after implementation and the last survey six months after. 51 (77%) of the physicians answered the baseline survey. Of those, 32 (63%) were males with a mean age of 37.8 ± 5.5 years. Prior to the mobile application implementation, 36 (70%) of the responders were using more than one method to carry out shift exchanges and only 20 (40%) were using the official department report sheet to document shift exchanges. The second and third survey were answered by 48 (73%) physicians. Forty-eight (98%) of them found the mobile application easy or very easy to install and 47 (96%) did not want to go back to the previous method. Regarding physician satisfaction, at baseline 37% of the physicians were unsatisfied or very unsatisfied with shift scheduling. After the mobile application was implementation, only 4% reported being unsatisfied (OR = 0.11, p < 0.001). The satisfaction level improved from 63% to 96% between the first and the last survey. Satisfaction levels significantly increased between the three time points (OR = 13.33, p < 0.001). Our web and mobile phone-based scheduling system resulted in better physician satisfaction.

  16. Optimal screening interval for men with low baseline prostate-specific antigen levels (≤1.0 ng/mL) in a prostate cancer screening program.

    PubMed

    Urata, Satoko; Kitagawa, Yasuhide; Matsuyama, Satoko; Naito, Renato; Yasuda, Kenji; Mizokami, Atsushi; Namiki, Mikio

    2017-04-01

    To optimize the rescreening schedule for men with low baseline prostate-specific antigen (PSA) levels, we evaluated men with baseline PSA levels of ≤1.0 ng/mL in PSA-based population screening. We enrolled 8086 men aged 55-69 years with baseline PSA levels of ≤1.0 ng/mL, who were screened annually. The relationships of baseline PSA and age with the cumulative risks and clinicopathological features of screening-detected cancer were investigated. Among the 8086 participants, 28 (0.35 %) and 18 (0.22 %) were diagnosed with prostate cancer and cancer with a Gleason score (GS) of ≥7 during the observation period, respectively. The cumulative probabilities of prostate cancer at 12 years were 0.42, 1.0, 3.4, and 4.3 % in men with baseline PSA levels of 0.0-0.4, 0.5-0.6, 0.7-0.8, and 0.9-1.0 ng/mL, respectively. Those with GS of ≥7 had cumulative probabilities of 0.42, 0.73, 2.8, and 1.9 %, respectively. The cumulative probabilities of prostate cancer were significantly lower when baseline PSA levels were 0.0-0.6 ng/mL compared with 0.7-1.0 ng/mL. Prostate cancer with a GS of ≥7 was not detected during the first 10 years of screening when baseline PSA levels were 0.0-0.6 ng/mL and was not detected during the first 2 years when baseline PSA levels were 0.7-1.0 ng/mL. Our study demonstrated that men with baseline PSA levels of 0.0-0.6 ng/mL might benefit from longer screening intervals than those recommended in the guidelines of the Japanese Urological Association. Further investigation is needed to confirm the optimal screening interval for men with low baseline PSA levels.

  17. Quantifying Sleep and Performance of West Point Cadets: A Baseline Study

    DTIC Science & Technology

    2004-06-01

    5. Table of reported average bedtimes (n= 991) and wakeup times (n=991) of those who reported their caffeine use for the 30 days prior to reporting...Military Academy at West Point, New York, cadets assume a rigorous schedule full of competing demands—military, athletic, and academic. This...they are operating with a degraded cognitive function. At the United States Military Academy at West Point, New York, cadets assume a rigorous schedule

  18. A Micro-Computer Based Employee Scheduling System for the Palo Alto Veterans Administration Medical Center

    DTIC Science & Technology

    1988-09-01

    scheduler’s knowledge of available employees ’ experience levels. If the scheduler lacks first-hand knowledge of employee experience levels, then assistance ...to start a new system of rotating primary employees and asked that this capability be included in the program . Yet he had only a vague idea 29 about...competitive with the DBASE prototype. The LOTUS 123 program was based around a spreadsheet that contained all the job, employee and schedule form data in a

  19. A distributed computing environment with support for constraint-based task scheduling and scientific experimentation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ahrens, J.P.; Shapiro, L.G.; Tanimoto, S.L.

    1997-04-01

    This paper describes a computing environment which supports computer-based scientific research work. Key features include support for automatic distributed scheduling and execution and computer-based scientific experimentation. A new flexible and extensible scheduling technique that is responsive to a user`s scheduling constraints, such as the ordering of program results and the specification of task assignments and processor utilization levels, is presented. An easy-to-use constraint language for specifying scheduling constraints, based on the relational database query language SQL, is described along with a search-based algorithm for fulfilling these constraints. A set of performance studies show that the environment can schedule and executemore » program graphs on a network of workstations as the user requests. A method for automatically generating computer-based scientific experiments is described. Experiments provide a concise method of specifying a large collection of parameterized program executions. The environment achieved significant speedups when executing experiments; for a large collection of scientific experiments an average speedup of 3.4 on an average of 5.5 scheduled processors was obtained.« less

  20. Preliminary design features of the RASCAL - A NASA/Army rotorcraft in-flight simulator

    NASA Technical Reports Server (NTRS)

    Aiken, Edwin W.; Jacobsen, Robert A.; Eshow, Michelle M.; Hindson, William S.; Doane, Douglas H.

    1992-01-01

    Salient design features of a new NASA/Army research rotorcraft - the Rotorcraft Aircrew Systems Concepts Airborne Laboratory (RASCAL) - are described. Using a UH-60A Black Hawk helicopter as a baseline vehicle, the RASCAL will be a flying laboratory capable of supporting the research requirements of major NASA and Army guidance, control, and display research programs. The paper describes the research facility requirements of these programs together with other critical constraints on the design of the research system, including safety-of-flight. Research program schedules demand a phased development approach, wherein specific research capability milestones are met and flight research projects are flown throughout the complete development cycle of the RASCAL. This development approach is summarized, and selected features of the research system are described. The research system includes a full-authority, programmable, fault-tolerant/fail-safe, fly-by-wire flight control system and a real-time obstacle detection and avoidance system which will generate low-latitude guidance commands to the pilot on a wide field-of-view, color helmet-mounted display.

  1. Preliminary design features of the RASCAL: A NASA /Army rotorcraft in-flight simulator

    NASA Technical Reports Server (NTRS)

    Aiken, Edwin W.; Jacobsen, Robert A.; Eshow, Michelle M.; Hindson, William S.; Doane, Douglas H.

    1993-01-01

    Salient design features of a new NASA/Army research rotorcraft - the Rotorcraft-Aircrew Systems Concepts Airborne Laboratory (RASCAL) - are described. Using a UH-60A Black Hawk helicopter as a baseline vehicle, the RASCAL will be a flying laboratory capable of supporting the research requirements of major NASA and Army guidance, control, and display research programs. The paper describes the research facility requirements of these programs together with other critical constraints on the design of the research system, including safety-of-flight. Research program schedules demand a phased development approach, wherein specific research capability milestones are met and flight research projects are flown throughout the complete development cycle of the RASCAL. This development approach is summarized, and selected features of the research system are described. The research system includes a full-authority, programmable, fault-tolerant/fail-safe, fly-by-wire flight control system and a real-time obstacle detection and avoidance system which will generate low-altitude guidance commands to the pilot on a wide field-of-view, color helmet-mounted display.

  2. NASA Schedule Management Handbook

    NASA Technical Reports Server (NTRS)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  3. Predicting Schedule Duration for Defense Acquisition Programs: Program Initiation to Initial Operational Capability

    DTIC Science & Technology

    2016-03-24

    Corporation found that increases in schedule effort tend to be the reason for increases in the cost of acquiring a new weapons system due to, at a minimum...in-depth finance and schedule data for selected programs (Brown et al., 2015). We also give extra focus on Research Development Test & Evaluation...we create and employ an entirely new database. The database we utilize for our research is a database originally built by the RAND Corporation for

  4. Integrated Hybrid System Architecture for Risk Analysis

    NASA Technical Reports Server (NTRS)

    Moynihan, Gary P.; Fonseca, Daniel J.; Ray, Paul S.

    2010-01-01

    A conceptual design has been announced of an expert-system computer program, and the development of a prototype of the program, intended for use as a project-management tool. The program integrates schedule and risk data for the purpose of determining the schedule applications of safety risks and, somewhat conversely, the effects of changes in schedules on changes on safety. It is noted that the design has been delivered to a NASA client and that it is planned to disclose the design in a conference presentation.

  5. Distributed Processor/Memory Architectures Design Program

    DTIC Science & Technology

    1975-02-01

    Event Scheduling Plo 31 Globat LAl Message Input Event Sicheduling Fhou ..... ............... 106 32 It tc Iata Representation...298 138 GEX LEX Scheduling Phlmophy ....... ...................... 300 139 Executive Comirol Herarchy... Scheduler Subroutine lnterrelatiomhips . ..... ................. 312 145 Task Scheduler Message Scatuer. . ...... ....................... 315 146

  6. Laboratory services series: a programmed maintenance system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuxbury, D.C.; Srite, B.E.

    1980-01-01

    The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.

  7. A computerized resolution of scheduling conflicts.

    PubMed

    Bolinger, R E; McFarlane, M J

    1989-01-01

    Residency training programs in Internal Medicine require resident attendance in a continuity clinic. This inevitably engenders conflicts between scheduling in the ambulatory clinic and the required teaching activities of the in-patient services. Some of the conflicts can be resolved by allowing the in-patient service directors to indicate preferred plans for their residents to attend in the continuity clinic. With this plan, scheduling becomes quite complicated. A computer program is presented with coordinates these service requests with ambulatory clinic scheduling. As a result, a given resident may have his/her clinic day changed on different rotations. The program automatically arbitrates conflicts and publishes the attendance dates for the entire academic year. This information is supplied to the appointment desk so that patients can be scheduled accordingly. This system has resulted in a 74% continuity rate and improved satisfaction by both residents and staff.

  8. DORCA II: Dynamic operations requirements and cost analysis program

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Program is written to handle logistics of acquisition and transport of personnel, equipment, and services and to determine costs, transport schedules, acquisition schedules, and fuel requirements of cargo transport.

  9. Adapting Scheduling Programs for Educational Specifications.

    ERIC Educational Resources Information Center

    Glass, Thomas E.

    1984-01-01

    Planners of a new Arizona school used the district's existing computerized master scheduling program to identify instructional spaces needed. Total classroom needs by subject were translated into total square footage requirements. (MLF)

  10. 48 CFR 38.101 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... authorize other agencies to award schedule contracts and publish schedules. For example, the Department of... CONTRACTING FEDERAL SUPPLY SCHEDULE CONTRACTING Federal Supply Schedule Program 38.101 General. (a) The... discounts. Indefinite-delivery contracts are awarded using competitive procedures to firms. The firms...

  11. Scheduling the resident 80-hour work week: an operations research algorithm.

    PubMed

    Day, T Eugene; Napoli, Joseph T; Kuo, Paul C

    2006-01-01

    The resident 80-hour work week requires that programs now schedule duty hours. Typically, scheduling is performed in an empirical "trial-and-error" fashion. However, this is a classic "scheduling" problem from the field of operations research (OR). It is similar to scheduling issues that airlines must face with pilots and planes routing through various airports at various times. The authors hypothesized that an OR approach using iterative computer algorithms could provide a rational scheduling solution. Institution-specific constraints of the residency problem were formulated. A total of 56 residents are rotating through 4 hospitals. Additional constraints were dictated by the Residency Review Committee (RRC) rules or the specific surgical service. For example, at Hospital 1, during the weekday hours between 6 am and 6 pm, there will be a PGY4 or PGY5 and a PGY2 or PGY3 on-duty to cover Service "A." A series of equations and logic statements was generated to satisfy all constraints and requirements. These were restated in the Optimization Programming Language used by the ILOG software suite for solving mixed integer programming problems. An integer programming solution was generated to this resource-constrained assignment problem. A total of 30,900 variables and 12,443 constraints were required. A total of man-hours of programming were used; computer run-time was 25.9 hours. A weekly schedule was generated for each resident that satisfied the RRC regulations while fulfilling all stated surgical service requirements. Each required between 64 and 80 weekly resident duty hours. The authors conclude that OR is a viable approach to schedule resident work hours. This technique is sufficiently robust to accommodate changes in resident numbers, service requirements, and service and hospital rotations.

  12. The Mini-CAPTAIN Neutron Run and Future CAPTAIN Program

    NASA Astrophysics Data System (ADS)

    Cooper, Robert; CAPTAIN Collaboration

    2016-09-01

    The Cryogenic Apparatus for Precision Tests of Argon Interaction with Neutrinos (CAPTAIN) is an experimental program to measure critical neutrino interaction cross sections in argon for the DUNE long-baseline program. These cross sections are important for understanding and improving the energy resolution of measurements for neutrino oscillations and supernova detection in argon. The full CAPTAIN detector is a 5-ton fiducial volume liquid argon (LAr) time-projection chamber (TPC) with an independently triggered photon detection system (PDS) for fast-timing capabilities on accelerators. To test the full CAPTAIN concept, the 1-ton fiducial volume mini-CAPTAIN detector has been deployed. Mini-CAPTAIN is another LAr TPC with PDS. It was recently deployed to the Weapons Neutron Research (WNR) facility at Los Alamos National Laboratory to measure high-energy neutron interactions in argon. The WNR is a pulsed accelerator capable of delivering neutrons up to 800 MeV in energy. In this talk, I will report on the analysis of the first time-of-flight tagged, high-energy neutron response in liquid argon from our February 2016 run. I will also highlight a second neutron run at the WNR scheduled for Summer 2017 and discuss the implications these data have on the future CAPTAIN program.

  13. Software For Integer Programming

    NASA Technical Reports Server (NTRS)

    Fogle, F. R.

    1992-01-01

    Improved Exploratory Search Technique for Pure Integer Linear Programming Problems (IESIP) program optimizes objective function of variables subject to confining functions or constraints, using discrete optimization or integer programming. Enables rapid solution of problems up to 10 variables in size. Integer programming required for accuracy in modeling systems containing small number of components, distribution of goods, scheduling operations on machine tools, and scheduling production in general. Written in Borland's TURBO Pascal.

  14. 77 FR 12622 - Records Schedules; Availability and Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... chemical weapons convention program records and protocol program records. 3. Department of Defense, Defense... disposition process is available on request. Schedules Pending 1. Department of the Army, Agency-wide (N1-AU... programs, housing, recreation, and travel. 2. Department of Commerce, Bureau of Industry and Security, (N1...

  15. Computer Technology and Its Impact on Recreation and Sport Programs.

    ERIC Educational Resources Information Center

    Ross, Craig M.

    This paper describes several types of computer programs that can be useful to sports and recreation programs. Computerized tournament scheduling software is helpful to recreation and parks staff working with tournaments of 50 teams/individuals or more. Important features include team capacity, league formation, scheduling conflicts, scheduling…

  16. 40 CFR 123.45 - Noncompliance and program reporting by the Director.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) WATER PROGRAMS STATE PROGRAM REQUIREMENTS Transfer of Information and Permit Review § 123.45... schedule report for final compliance or a monitoring report. This applies when the permittee has failed to submit a final compliance schedule progress report, pretreatment report, or a Discharge Monitoring Report...

  17. 40 CFR 123.45 - Noncompliance and program reporting by the Director.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) WATER PROGRAMS STATE PROGRAM REQUIREMENTS Transfer of Information and Permit Review § 123.45... schedule report for final compliance or a monitoring report. This applies when the permittee has failed to submit a final compliance schedule progress report, pretreatment report, or a Discharge Monitoring Report...

  18. 40 CFR 123.45 - Noncompliance and program reporting by the Director.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) WATER PROGRAMS STATE PROGRAM REQUIREMENTS Transfer of Information and Permit Review § 123.45... schedule report for final compliance or a monitoring report. This applies when the permittee has failed to submit a final compliance schedule progress report, pretreatment report, or a Discharge Monitoring Report...

  19. 40 CFR 123.45 - Noncompliance and program reporting by the Director.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) WATER PROGRAMS STATE PROGRAM REQUIREMENTS Transfer of Information and Permit Review § 123.45... schedule report for final compliance or a monitoring report. This applies when the permittee has failed to submit a final compliance schedule progress report, pretreatment report, or a Discharge Monitoring Report...

  20. 78 FR 69612 - Negotiated Rulemaking Committee, Negotiator Nominations and Schedule of Committee Meetings-Title...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... Committee, Negotiator Nominations and Schedule of Committee Meetings--Title IV Federal Student Aid Programs... the Federal Student Aid programs authorized under title IV of the Higher Education Act of 1965, as amended (HEA) (title IV Federal Student Aid programs). The committee will include representatives of...

  1. A survey of planning and scheduling research at the NASA Ames Research Center

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1989-01-01

    NASA Ames Research Center has a diverse program in planning and scheduling. Some research projects as well as some applications are highlighted. Topics addressed include machine learning techniques, action representations and constraint-based scheduling systems. The applications discussed are planetary rovers, Hubble Space Telescope scheduling, and Pioneer Venus orbit scheduling.

  2. Effects of a Workplace Intervention on Parent-Child Relationships

    PubMed Central

    McHale, Susan M.; Davis, Kelly D.; Green, Kaylin; Casper, Lynne; Kan, Marni L.; Kelly, Erin L.; King, Rosalind Berkowitz; Okechukwu, Cassandra

    2015-01-01

    This study tested whether effects of a workplace intervention, aimed at promoting employees’ schedule control and supervisor support for personal and family life, had implications for parent-adolescent relationships; we also tested whether parent-child relationships differed as a function of how many intervention program sessions participants attended. Data came from a group randomized trial of a workplace intervention, delivered in the information technology division of a Fortune 500 company. Analyses focused on 125 parent-adolescent dyads that completed baseline and 12-month follow-up home interviews. Results revealed no main effects of the intervention, but children of employees who attended 75% or more program sessions reported more time with their parent and more parent education involvement compared to adolescents whose parents attended less than 75% of sessions, and they tended to report more time with parent and more parental solicitation of information about their experiences compared to adolescents whose parents were randomly assigned to the usual practice condition. PMID:26957897

  3. Middle cerebral artery blood flow velocity during beach chair position for shoulder surgery under general anesthesia.

    PubMed

    Hanouz, Jean-Luc; Fiant, Anne-Lise; Gérard, Jean-Louis

    2016-09-01

    The goal of the present study was to examine changes of middle cerebral artery (VMCA) blood flow velocity in patients scheduled for shoulder surgery in beach chair position. Prospective observational study. Operating room, shoulder surgery. Fifty-three consecutive patients scheduled for shoulder surgery in beach chair position. Transcranial Doppler performed after induction of general anesthesia (baseline), after beach chair positioning (BC1), during surgery 20minutes (BC2), and after back to supine position before stopping anesthesia (supine). Mean arterial pressure (MAP), end-tidal CO2, and volatile anesthetic concentration and VMCA were recorded at baseline, BC1, BC2, and supine. Postoperative neurologic complications were searched. Beach chair position induced decrease in MAP (baseline: 73±10mm Hg vs lower MAP recorded: 61±10mm Hg; P<.0001) requiring vasopressors and fluid challenge in 44 patients (83%). There was a significant decrease in VMCA after beach chair positioning (BC1: 33±10cm/s vs baseline: 39±14cm/s; P=.001). The VMCA at baseline (39±2cm/s), BC2 (35±14cm/s), and supine (39±14cm/s) were not different. The minimal alveolar concentration of volatile anesthetics, end-tidal CO2, SpO2, and MAP were not different at baseline, BC1, BC2, and supine. Beach chair position resulted in transient decrease in MAP requiring fluid challenge and vasopressors and a moderate decrease in VMCA. Copyright © 2016 Elsevier Inc. All rights reserved.

  4. Scheduling language and algorithm development study. Volume 2: Use of the basic language and module library

    NASA Technical Reports Server (NTRS)

    Chamberlain, R. A.; Cornick, D. E.; Flater, J. F.; Odoherty, R. J.; Peterson, F. M.; Ramsey, H. R.; Willoughby, J. K.

    1974-01-01

    The capabilities of the specified scheduling language and the program module library are outlined. The summary is written with the potential user in mind and, therefore, provides maximum insight on how the capabilities will be helpful in writing scheduling programs. Simple examples and illustrations are provided to assist the potential user in applying the capabilities of his problem.

  5. Planning and scheduling for success

    NASA Technical Reports Server (NTRS)

    Manzanera, Ignacio

    1994-01-01

    Planning and scheduling programs are excellent management tools when properly introduced to the project management team and regularly maintained. Communications, creativity, flexibility and accuracy are substantially improved by following a simple set of rules. A planning and scheduling program will work for you if you believe in it, make others in your project team realize its benefits, and make it an extension of your project cost control philosophy.

  6. User's Guide for the Interactive Scheduling Program : Preliminary Calendar Version

    DOT National Transportation Integrated Search

    1978-08-01

    The Office of Transportation Management of the Urban Mass Transportation Administration (UMTA), in conjunction with the Transportation Systems Center (TSC), designed and developed the Interactive Scheduling Program (ISP) to assist rail-transit operat...

  7. Switching from oral extended-release methylphenidate to the methylphenidate transdermal system: continued ADHD symptom control and tolerability after abrupt conversion

    PubMed Central

    Arnold, L. E.; Hodgkins, P.; McKay, M.; Beckett-Thurman, L.; Greenbaum, M.; Bukstein, O.; Patel, A.; Bozzolo, D. R.

    2013-01-01

    Objective To evaluate symptom control and tolerability after abrupt conversion from oral extended-release methylphenidate (ER-MPH) to methylphenidate transdermal system (MTS) via a dose-transition schedule in children with attention-deficit/hyperactivity disorder (ADHD). Methods In a 4-week, prospective, multisite, open-label study, 171 children (164 intent-to-treat) with diagnosed ADHD aged 6–12 years abruptly switched from a stable dose of oral ER-MPH to MTS in nominal dosages of 10, 15, 20, and 30 mg using a predefined dose-transition schedule. After the first week on the scheduled dose, the dose was titrated to optimal effect. The primary effectiveness outcome was the change from baseline (while taking ER-MPH) to week 4 in ADHD-Rating Scale-IV (ADHD-RS-IV) total scores. Adverse events (AEs) were assessed throughout the study. Results Most subjects (58%) remained on the initial MTS dose defined by the dose-transition schedule; 38% increased and 4% decreased their MTS dose for optimization. MTS dose optimization resulted in significantly better ADHD-RS-IV total (mean ± SD) scores at week 4 than at baseline (9.9±7.47 vs 14.1±7.48; p<0.0001). The most commonly reported AEs included headache, decreased appetite, insomnia, and upper abdominal pain. Four subjects (2.3%) discontinued because of application site reactions and 3 discontinued because of other AEs. Conclusions Abrupt conversion from a stable dose of oral ER-MPH to MTS was accomplished using a predefined dose-transition schedule without loss of symptom control; however, careful titration to optimal dose is recommended. Most AEs were mild to moderate and, with the exception of application site reactions, were similar to AEs typically observed with oral MPH. Limitations of this study included its open-label sequential design without placebo, which could result in spurious attribution of improvement to the study treatment and precluded superiority determinations of MTS over baseline ER-MPH treatment. The apparent superiority of MTS was likely due to more careful titration and clinical monitoring rather than the product itself. NCT NCT00151983 PMID:19916704

  8. Scheduling language and algorithm development study. Volume 1: Study summary and overview

    NASA Technical Reports Server (NTRS)

    1974-01-01

    A high level computer programming language and a program library were developed to be used in writing programs for scheduling complex systems such as the space transportation system. The objectives and requirements of the study are summarized and unique features of the specified language and program library are described and related to the why of the objectives and requirements.

  9. Development and impact of exercise self-efficacy types during and after cardiac rehabilitation.

    PubMed

    Rodgers, Wendy M; Murray, Terra C; Selzler, Anne-Marie; Norman, Paul

    2013-05-01

    Cardiovascular disease (CVD) is the leading cause of death in the developed world. Cardiac rehabilitation (CR) is a comprehensive treatment program centered on structured exercise that has been demonstrated to achieve significant decreases in mortality and morbidity in cardiac patients, yet few patients adhere to exercise post-CR and so fail to maintain any health benefits accrued during rehabilitation. One reason for the lack of adherence might be that CR fails to address the challenges to adherence faced by patients when they no longer have the resources and structure of CR to support them. Self-efficacy (SE) is a robust predictor of behavioral persistence. This study therefore focuses on changes in different types of SE during CR and the relationship of SE to subsequent levels of physical activity. A sample of 63 CR patients completed assessments of task, scheduling and coping SE at baseline and the end of CR, as well as self-reported exercise behavior at the end of CR and 1-month post-CR. Task SE (for performing elemental aspects of the behavior) was found to be most changed type of SE during CR and was strongly related to self-reported exercise at the end of CR. However, scheduling SE (for performing the behavior regularly) was most strongly related to self-reported exercise post-CR. These results are theoretically consistent and suggest that scheduling SE should be targeted during CR to improve post-CR exercise adherence.

  10. The effect of work-time influence on health and well-being: a quasi-experimental intervention study among eldercare workers.

    PubMed

    Nabe-Nielsen, Kirsten; Garde, Anne Helene; Diderichsen, Finn

    2011-08-01

    The aim of this study was to investigate the effect of work-time influence on stress and energy, work-family conflicts, lifestyle factors, and biomarkers of cardiovascular disease risk. The study was a quasi-experimental intervention study with a one-year follow-up among eldercare workers (baseline: n = 309; follow-up: n = 297). The nine work units in the intervention group designed their own intervention. We categorized these work units into three subgroups according to the interventions that they initiated: (A) self-scheduling via a computer program (n = 35), (B) setting up a task group that developed a questionnaire on work-time preference and participated in a one-day course on flexible working hours with the intention to increase employee influence on the fixed rota (n = 62), and (C) discussions of how employee work-time influence could be increased (n = 25). These subgroups were compared with a reference group consisting of ten work units (n = 187). Data consisted of questionnaires, blood samples, and measurements of waist and hip circumference. The employees in subgroup A became increasingly involved in the planning of their own work schedule. Nevertheless, we found no effect on health and well-being attributable to the intervention. The introduction of self-scheduling can successfully increase employee work-time influence. Yet, this study does not support the theory that increased work-time influence leads to better health and well-being.

  11. Automatic programming via iterated local search for dynamic job shop scheduling.

    PubMed

    Nguyen, Su; Zhang, Mengjie; Johnston, Mark; Tan, Kay Chen

    2015-01-01

    Dispatching rules have been commonly used in practice for making sequencing and scheduling decisions. Due to specific characteristics of each manufacturing system, there is no universal dispatching rule that can dominate in all situations. Therefore, it is important to design specialized dispatching rules to enhance the scheduling performance for each manufacturing environment. Evolutionary computation approaches such as tree-based genetic programming (TGP) and gene expression programming (GEP) have been proposed to facilitate the design task through automatic design of dispatching rules. However, these methods are still limited by their high computational cost and low exploitation ability. To overcome this problem, we develop a new approach to automatic programming via iterated local search (APRILS) for dynamic job shop scheduling. The key idea of APRILS is to perform multiple local searches started with programs modified from the best obtained programs so far. The experiments show that APRILS outperforms TGP and GEP in most simulation scenarios in terms of effectiveness and efficiency. The analysis also shows that programs generated by APRILS are more compact than those obtained by genetic programming. An investigation of the behavior of APRILS suggests that the good performance of APRILS comes from the balance between exploration and exploitation in its search mechanism.

  12. Development and pilot testing of a disease management program for low literacy patients with heart failure.

    PubMed

    DeWalt, Darren A; Pignone, Michael; Malone, Robb; Rawls, Cathy; Kosnar, Margaret C; George, Geeta; Bryant, Betsy; Rothman, Russell L; Angel, Bonnie

    2004-10-01

    Development and pilot testing of a disease management program for low literacy patients with heart failure. Randomized trials have shown that disease management programs can reduce hospitalizations and improve symptoms for patients with congestive heart failure. We sought to create and pilot test such a program for patients with low literacy skills. We used focus groups and individual cognitive response interviews (CRIs) to develop an educational booklet for low literacy patients with heart failure. We incorporated the booklet into a disease management intervention that also included an initial individualized 1-h educational session and scheduled supportive phone calls that were tapered over 6 weeks. We then conducted a 3-month before-after study on patients with low literacy skills (<9th grade literacy level) in a university internal medicine clinic to test the acceptability and efficacy of our program. Outcomes of interest included heart failure-related knowledge, self-care behavior and heart failure-related symptoms measured on the Minnesota Living with Heart Failure (MLwHF) scale. Twenty-five patients were enrolled and 23 (92%) completed 3-month follow-up. Mean age was 60 years (range 35-74), 60% were men, 60% were African-American, and 74% had household income under $15,000 per year. The median reading level was fifth grade with 32% reading at or below the third grade level. Mean knowledge score at baseline was 67% and did not improve after the intervention. The proportion of patients reporting weighing themselves daily increased from 32% at baseline to 100% at 12 weeks. Mean improvement on the MLwHF scale was 9.9 points over the 3-month trial (95% CI: 0.5, 19.2), which corresponds to an improvement in one class on the New York Heart Association heart failure scale. A heart failure disease management program designed specifically for patients with low literacy skills is acceptable and is associated with improvement in self-care behavior and heart failure related symptoms.

  13. Dosing Schedules for Pneumococcal Conjugate Vaccine

    PubMed Central

    2014-01-01

    Since second generation pneumococcal conjugate vaccines (PCVs) targeting 10 and 13 serotypes became available in 2010, the number of national policy makers considering these vaccines has steadily increased. An important consideration for a national immunization program is the timing and number of doses—the schedule—that will best prevent disease in the population. Data on disease epidemiology and the efficacy or effectiveness of PCV schedules are typically considered when choosing a schedule. Practical concerns, such as the existing vaccine schedule, and vaccine program performance are also important. In low-income countries, pneumococcal disease and deaths typically peak well before the end of the first year of life, making a schedule that provides PCV doses early in life (eg, a 6-, 10- and 14-week schedule) potentially the best option. In other settings, a schedule including a booster dose may address disease that peaks in the second year of life or may be seen to enhance a schedule already in place. A large and growing body of evidence from immunogenicity studies, as well as clinical trials and observational studies of carriage, pneumonia and invasive disease, has been systematically reviewed; these data indicate that schedules of 3 or 4 doses all work well, and that the differences between these regimens are subtle, especially in a mature program in which coverage is high and indirect (herd) effects help enhance protection provided directly by a vaccine schedule. The recent World Health Organization policy statement on PCVs endorsed a schedule of 3 primary doses without a booster or, as a new alternative, 2 primary doses with a booster dose. While 1 schedule may be preferred in a particular setting based on local epidemiology or practical considerations, achieving high coverage with 3 doses is likely more important than the specific timing of doses. PMID:24336059

  14. Joint Polar Satellite System: the United States New Generation Civilian Polar Orbiting Environmental Satellite System

    NASA Astrophysics Data System (ADS)

    Mandt, G.

    2017-12-01

    The Joint Polar Satellite System (JPSS) is the Nation's advanced series of polar-orbiting environmental satellites. JPSS represents significant technological and scientific advancements in observations used for severe weather prediction and environmental monitoring. The Suomi National Polar-orbiting Partnership (S-NPP) is providing state-of-the art atmospheric, oceanographic, and environmental data, as the first of the JPSS satellites while the second in the series, J-1, is scheduled to launch in October 2017. The JPSS baseline consists of a suite of four instruments: an advanced microwave and infrared sounders which are critical for weather forecasting; a leading-edge visible and infrared imager critical to data sparse areas such as Alaska and needed for environmental assessments such as snow/ice cover, droughts, volcanic ash, forest fires and surface temperature; and an ozone sensor primarily used for global monitoring of ozone and input to weather and climate models. The same suite of instruments that are on JPSS-1 will be on JPSS-2, 3 and 4. The JPSS-2 instruments are well into their assembly and test phases and are scheduled to be completed in 2018. The JPSS-2 spacecraft critical design review (CDR) is scheduled for 2Q 2018 with the launch in 2021. The sensors for the JPSS-3 and 4 spacecraft have been approved to enter into their acquisition phases. JPSS partnership with the US National Aeronautics and Space Agency (NASA) continues to provide a strong foundation for the program's success. JPSS also continues to maintain its important international relationships with European Organisation for the Exploitation of Meteorological Satellites (EUMETSAT) and the Japan Aerospace Exploration Agency (JAXA). JPSS works closely with its user community through the Proving Ground and Risk Reduction (PGRR) Program to identify opportunities to maximize the operational application of current JPSS capabilities. The PGRR Program also helps identify and evaluate the use of JPSS capabilities for new operational missions. The launch of JPSS-1 will add data and products 50 minutes apart from S-NPP increasing the benefit to the user community for years to come.

  15. Abstract-Reasoning Software for Coordinating Multiple Agents

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Barrett, Anthony; Rabideau, Gregg; Knight, Russell

    2003-01-01

    A computer program for scheduling the activities of multiple agents that share limited resources has been incorporated into the Automated Scheduling and Planning Environment (ASPEN) software system, aspects of which have been reported in several previous NASA Tech Briefs articles. In the original intended application, the agents would be multiple spacecraft and/or robotic vehicles engaged in scientific exploration of distant planets. The program could also be used on Earth in such diverse settings as production lines and military maneuvers. This program includes a planning/scheduling subprogram of the iterative repair type that reasons about the activities of multiple agents at abstract levels in order to greatly improve the scheduling of their use of shared resources. The program summarizes the information about the constraints on, and resource requirements of, abstract activities on the basis of the constraints and requirements that pertain to their potential refinements (decomposition into less-abstract and ultimately to primitive activities). The advantage of reasoning about summary information is that time needed to find consistent schedules is exponentially smaller than the time that would be needed for reasoning about the same tasks at the primitive level.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Russell, J.S.

    Several factors in the development of the East Wilmington oil field by THUMS Long Beach Co. are described. These include: critical path scheduling, complex stratigraphy, reservoir engineering, drilling program, production methods, pressure maintenance, crude oil processing, automation, transportation facilities, service lines, and electrical facilities. The complexity and closely scheduled operational events interwoven in the THUMS project demands a method for the carefully planned sequence of jobs to be done, beginning with island construction up through routine production and to the LACT system. These demanding requirements necessitated the use of a critical path scheduling program. It was decided to use themore » program evaluation technique. This technique is used to assign responsibilities for individual assignments to time assignments, and to keep the overall program on schedule. The stratigraphy of East Wilmington complicates all engineering functions associated with recovery methods and reservoir evaluation. At least 5 major faults are anticipated.« less

  17. The Composition of the Master Schedule

    NASA Technical Reports Server (NTRS)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  18. Pitch Guidance Optimization for the Orion Abort Flight Tests

    NASA Technical Reports Server (NTRS)

    Stillwater, Ryan Allanque

    2010-01-01

    The National Aeronautics and Space Administration created the Constellation program to develop the next generation of manned space vehicles and launch vehicles. The Orion abort system is initiated in the event of an unsafe condition during launch. The system has a controller gains schedule that can be tuned to reduce the attitude errors between the simulated Orion abort trajectories and the guidance trajectory. A program was created that uses the method of steepest descent to tune the pitch gains schedule by an automated procedure. The gains schedule optimization was applied to three potential abort scenarios; each scenario tested using the optimized gains schedule resulted in reduced attitude errors when compared to the Orion production gains schedule.

  19. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling an...

  20. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling an...

  1. Scheduling language and algorithm development study. Volume 2, phase 2: Introduction to plans programming. [user guide

    NASA Technical Reports Server (NTRS)

    Cochran, D. R.; Ishikawa, M. K.; Paulson, R. E.; Ramsey, H. R.

    1975-01-01

    A user guide for the Programming Language for Allocation and Network Scheduling (PLANS) is presented. Information is included for the construction of PLANS programs. The basic philosophy of PLANS is discussed, and access and update reference techniques are described along with the use of tree structures.

  2. 14 CFR 91.1029 - Flight scheduling and locating requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... program manager must establish and use an adequate system to schedule and release program aircraft. (b) Except as provided in paragraph (d) of this section, each program manager must have adequate procedures... manager with at least the information required to be included in a VFR flight plan; (2) Provide for timely...

  3. Content Analysis Schedule for Bilingual Education Programs: Albuquerque Public School Bicultural-Bilingual Program.

    ERIC Educational Resources Information Center

    Hess, Richard T.; And Others

    This content analysis schedule for the Albuquerque (New Mexico) Public School Bicultural-Bilingual Program presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and…

  4. Schools as potential vaccination venue for vaccines outside regular EPI schedule: results from a school census in Pakistan.

    PubMed

    Soofi, Sajid Bashir; Haq, Inam-Ul; Khan, M Imran; Siddiqui, Muhammad Bilal; Mirani, Mushtaq; Tahir, Rehman; Hussain, Imtiaz; Puri, Mahesh K; Suhag, Zamir Hussain; Khowaja, Asif R; Lasi, Abdul Razzaq; Clemens, John D; Favorov, Michael; Ochiai, R Leon; Bhutta, Zulfiqar A

    2012-01-06

    Vaccines are the most effective public health intervention. Expanded Program on Immunization (EPI) provides routine vaccination in developing countries. However, vaccines that cannot be given in EPI schedule such as typhoid fever vaccine need alternative venues. In areas where school enrolment is high, schools provide a cost effective opportunity for vaccination. Prior to start of a school-based typhoid vaccination program, interviews were conducted with staff of educational institutions in two townships of Karachi, Pakistan to collect baseline information about the school system and to plan a typhoid vaccination program. Data collection teams administered a structured questionnaire to all schools in the two townships. The administrative staff was requested information on school fee, class enrolment, past history of involvement and willingness of parents to participate in a vaccination campaign. A total of 304,836 students were enrolled in 1,096 public, private, and religious schools (Madrasahs) of the two towns. Five percent of schools refused to participate in the school census. Twenty-five percent of schools had a total enrolment of less than 100 students whereas 3% had more than 1,000 students. Health education programs were available in less than 8% of public schools, 17% of private schools, and 14% of Madrasahs. One-quarter of public schools, 41% of private schools, and 43% of Madrasahs had previously participated in a school-based vaccination campaign. The most common vaccination campaign in which schools participated was Polio eradication program. Cost of the vaccine, side effects, and parents' lack of information were highlighted as important limiting factors by school administration for school-based immunization programs. Permission from parents, appropriateness of vaccine-related information, and involvement of teachers were considered as important factors to improve participation. Health education programs are not part of the regular school curriculum in developing countries including Pakistan. Many schools in the targeted townships participated in immunization activities but they were not carried out regularly. In the wake of low immunization coverage in Pakistan, schools can be used as a potential venue not only for non-EPI vaccines, but for a catch up vaccination of routine vaccines.

  5. STS-58 crewmembers participate in baseline data collection

    NASA Image and Video Library

    1993-09-29

    S93-45364 (29 Sept 1993) --- Astronaut David A. Wolf, mission specialist, participates in pre-flight data collection for the cardiovascular experiments scheduled to fly aboard Columbia for the Spacelab Life Sciences (SLS-2) mission.

  6. Scheduling for Locality in Shared-Memory Multiprocessors

    DTIC Science & Technology

    1993-05-01

    Submitted in Partial Fulfillment of the Requirements for the Degree ’)iIC Q(JALfryT INSPECTED 5 DOCTOR OF PHILOSOPHY I Accesion For Supervised by NTIS CRAM... architecture on parallel program performance, explain the implications of this trend on popular parallel programming models, and propose system software to 0...decomoosition and scheduling algorithms. I. SUIUECT TERMS IS. NUMBER OF PAGES shared-memory multiprocessors; architecture trends; loop 110 scheduling

  7. Meeting of the Society for Research on Biological Rhythms (2nd) Held in Jacksonville, Florida on 9-13 May 1990. Programs and Abstracts

    DTIC Science & Technology

    1993-04-30

    3 Maps Session Room s ....................................................... 4 Tram Schedule ...5 A m elia Island ......................................................... 6 Program Schedule ...Ballroom B 2 Ballroom A _ __ Seminar Rooms 4 and 5 4 -4- TRAM SCHEDULE 6 Tj A-eia is arc- 5a t a ’: 1cI.YARSHSIDE ca -,a -s, c -- s TRAM z:S-- - a-’s

  8. Optimally Scheduling Basic Courses at the Defense Language Institute using Integer Programming

    DTIC Science & Technology

    2005-09-01

    DLI’s manual schedules at best can train 8%, 7% and 64%. 15. NUMBER OF PAGES 59 14. SUBJECT TERMS Operations Research, Linear Programming...class in 2006, 2007, and 2008, whereas DLI’s manual schedules at best can train 8%, 7% and 64%. vi THIS PAGE...ARABIC INSTRUTOR LEVELS .....................................25 FIGURE 2. OCS1 AND OCS2 CHINESE-MANDARIN INSTRUTOR LEVELS ............26 FIGURE 3

  9. White Paper on SBUV/2 Solar Irradiance Measurements

    NASA Technical Reports Server (NTRS)

    Hilsenrath, Ernest; DeLand, Matthew T.; Cebula, Richard P.

    1996-01-01

    The importance of solar irradiance measurements by the Solar Backscatter Ultraviolet, Model 2 (SBUV/2) instruments on NOAA's operational satellites is described. These measurements are necessary accurately monitor the long-term changes in the global column ozone amount, the altitude distribution of ozone in the upper stratosphere, and the degree to which ozone changes are caused by anthropogenic sources. Needed to accomplish these goals are weekly solar irradiance measurements at the operational ozone wavelengths, daily measurements of the Mg II proxy index, instrument-specific Mg II scale factors, and daily measurements of the solar spectral irradiance at photochemically important wavelengths. Two solar measurement schedules are provided: (1) a baseline schedule for all instruments except the NOAA-14 instrument and (2) a modified schedule for the NOAA-14 SBUV/2 instrument. This latter schedule is needed due to the NOAA-14 grating drive problems.

  10. 49 CFR 381.510 - May the FMCSA end a pilot program before its scheduled completion date?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... achieving a level of safety that is at least equivalent to the level of safety that would be achieved by... 49 Transportation 5 2010-10-01 2010-10-01 false May the FMCSA end a pilot program before its... Pilot Programs § 381.510 May the FMCSA end a pilot program before its scheduled completion date? The...

  11. Aspects of job scheduling

    NASA Technical Reports Server (NTRS)

    Phillips, K.

    1976-01-01

    A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.

  12. Treating Non-Retentive Encopresis with Rewarded Scheduled Toilet Visits

    PubMed Central

    Boles, Richard E; Roberts, Michael C; Vernberg, Eric M

    2008-01-01

    We evaluated the effects of rewarded scheduled toilet sits on non-retentive encopretic behavior of an elementary-school student receiving services for serious emotional disturbance. A multidisciplinary team implemented the 8-week intervention using a multiple baseline across settings design. The results showed an increase in sitting on the toilet and a decline in encopretic episodes in both school and home settings. These findings support the use of a behavioral intervention for children with significant behavioral disorders within a classroom setting. PMID:22477690

  13. Effects of an exercise and scheduled-toileting intervention on appetite and constipation in nursing home residents.

    PubMed

    Simmons, S F; Schnelle, J F

    2004-01-01

    To evaluate the effects of an exercise and scheduled-toileting intervention on appetite and constipation in nursing home (NH) residents. A controlled, clinical intervention trial with 89 residents in two NHs. Research staff provided exercise and toileting assistance every two hours, four times per day, five days a week for 32 weeks. Oral food and fluid consumption during meals was measured at baseline, eight and 32 weeks. Bowel movement frequency was measured at baseline and 32 weeks. The intervention group showed significant improvements or maintenance across all measures of daily physical activity, functional performance, and strength compared to the control group. Participants in both groups consumed an average of approximately 55% of meals at all three time points (approximately 1100 calories/day) with no change over time in either group. There was also no change in the frequency of bowel movements in either group, which averaged less than one in two days for both groups; and, approximately one-half of all participants had no bowel movement in two days. An exercise and scheduled-toileting intervention alone is not sufficient to improve oral food and fluid consumption during meals and bowel movement frequency in NH residents.

  14. Materials experiment carrier concepts definition study. Volume 3: Programmatics, part 2

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Project logic, schedule and funding information was derived to enable decisions to be made regarding implementation of MEC system development. A master schedule and cost and price estimates (ROM) were developed for a project that consists of development of an all-up MEC, its integration with payloads and its flight on one 90 day mission. In Part 2 of the study a simple initial MEC was defined to accommodate three MPS baseline payloads. The design of this initial MEC is illustrated. The project logic, detailed schedules, and ROM cost estimate relate to a project in which this initial MEC is developed, integrated with payloads and flown once for 180 days.

  15. A novel Web-based graduate medical education management system including ACGME compliance algorithms.

    PubMed

    Gauger, Paul G; Davis, Janice W; Orr, Peter J

    2002-09-01

    Administration of graduate medical education programs has become more difficult as compliance with ACGME work guidelines has assumed increased importance. These guidelines have caused many changes in the resident work environment, including the emergence of complicated cross-cover arrangements. Many participating residents (each with his or her own individual scheduling requirements) usually generate these schedules. Accordingly, schedules are often not submitted in a timely fashion and they may not be in compliance with the ACGME guidelines for maximum on-call assignments and mandatory days off. Our objective was the establishment of a Web-based system that guides residents in creating on-call schedules that follow ACGME guidelines while still allowing maximum flexibility -- thus allowing each resident to maintain an internal locus of control. A versatile and scalable system with password-protected user (resident) and administrator interfaces was created. An entire academic year is included, and past months and years are automatically archived. The residents log on within the first 15 days of the preceding month and choose their positions in a schedule template. They then make adjustments while receiving immediate summary feedback on compliance with ACGME guidelines. The schedule is electronically submitted to the educational administrator for final approval. If a cross-cover system is required, the program automatically generates an optimal schedule using both of the approved participating service schedules. The residents then have an additional five-day period to make adjustments in the cross-cover schedule while still receiving compliance feedback. The administrator again provides final approval electronically. The communication interface automatically pages or e-mails the residents when schedules are updated or approved. Since the information exists in a relational database, simple reporting tools are included to extract the information necessary to generate records for institutional GME management. Implementation of this program has been met with great enthusiasm from the institutional stakeholders. Specifically, residents have embraced the ability to directly control their schedules and have gained appreciation for the regulatory matrix in which they function. Institutional administrators have praised the improvement in compliance and the ease of documentation. We anticipate that the system will also meet with approval from reviewing regulatory bodies, as it generates and stores accurate information about the resident work environment. This program is robust and versatile enough to be modified for any GME training program in the country.

  16. Social support may protect against development of posttraumatic stress disorder: findings from the Heart and Soul Study.

    PubMed

    Dinenberg, Robert Eric; McCaslin, Shannon E; Bates, Michael N; Cohen, Beth E

    2014-01-01

    No prospective studies have examined the association of poor social support and development of posttraumatic stress disorder (PTSD) in patients with chronic illness. This study addresses this knowledge gap. This prospective study examines the relationship of social support to the subsequent development of PTSD during a 5-year period. San Francisco Veterans Affairs Medical Center. A total of 579 participants with cardiovascular disease did not have PTSD at baseline and returned for the 5-year follow-up examination. PTSD measured by Computerized Diagnostic Interview Schedule for DSM-IV. Social support measured by Interpersonal Support Evaluation List (ISEL). Unconditional ordered logistic regression analyses were performed to yield the odds ratio of developing PTSD for a one-standard-deviation change in ISEL score. Of 579 participants who did not have PTSD at baseline, approximately 6.4% (n = 37) developed PTSD. Higher baseline perceived social support was strongly protective against development of PTSD (OR = .60, p = .001). Results remained significant after adjustment for age, sex, race, income, and depression (OR = .69, p = .04). Of social support types examined, the "tangible" and "belonging" domains were most strongly associated with future PTSD status. Social support may impact development of PTSD. Interventions that optimize social support may be part of a PTSD prevention program designed to help individuals at risk of developing PTSD.

  17. Medicare program; revisions to payment policies under the physician fee schedule, clinical laboratory fee schedule & other revisions to Part B for CY 2014. Final rule with comment period.

    PubMed

    2013-12-10

    This major final rule with comment period addresses changes to the physician fee schedule, clinical laboratory fee schedule, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. This final rule with comment period also includes a discussion in the Supplementary Information regarding various programs. (See the Table of Contents for a listing of the specific issues addressed in the final rule with comment period.)

  18. Solving cyclical nurse scheduling problem using preemptive goal programming

    NASA Astrophysics Data System (ADS)

    Sundari, V. E.; Mardiyati, S.

    2017-07-01

    Nurse scheduling system in a hospital is being modeled as a preemptive goal programming problem that is solved by using LINGO software with the objective function to minimize deviation variable at each goal. The scheduling is done cyclically, so every nurse is treated fairly since they have the same work shift portion with the other nurses. By paying attention to the hospital's rules regarding nursing work shift cyclically, it can be obtained that numbers of nurse needed in every ward are 18 nurses and the numbers of scheduling periods are 18 periods where every period consists of 21 days.

  19. Evaluation of scheduling techniques for payload activity planning

    NASA Technical Reports Server (NTRS)

    Bullington, Stanley F.

    1991-01-01

    Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.

  20. A survey of planning and scheduling research at the NASA Ames Research Center

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1988-01-01

    NASA Ames Research Center has a diverse program in planning and scheduling. This paper highlights some of our research projects as well as some of our applications. Topics addressed include machine learning techniques, action representations and constraint-based scheduling systems. The applications discussed are planetary rovers, Hubble Space Telescope scheduling, and Pioneer Venus orbit scheduling.

  1. Relocation of the Cryo-Test Facility to NASA-MSFC

    NASA Technical Reports Server (NTRS)

    Sisco, Jimmy D.; McConnaughey, Paul K. (Technical Monitor)

    2002-01-01

    The Environmental Test Facility (ETF), located at NASA-Marshall Space Flight Center, Huntsville, Alabama, has provided thermal vacuum testing for several major programs since the 1960's. The ETF consists of over 13 thermal vacuum chambers sized and configured to handle the majority of test payloads. Testing is performed around the clock with multiple tests being conducted simultaneously. Chamber selection to achieve the best match with test articles and juggling program schedules, at times, can be a challenge. The ETF's Sunspot chamber has had tests scheduled and operated back-to-back for several years and provides the majority of schedule conflicts. Future test programs have been identified which surpass the current Sunspot availability. This paper describes a very low cost alternate to reduce schedule conflicts by utilizing government excess equipment

  2. Integrated planning and scheduling for Earth science data processing

    NASA Technical Reports Server (NTRS)

    Boddy, Mark; White, Jim; Goldman, Robert; Short, Nick, Jr.

    1995-01-01

    Several current NASA programs such as the EOSDIS Core System (ECS) have data processing and data management requirements that call for an integrated planning and scheduling capability. In this paper, we describe the experience of applying advanced scheduling technology operationally, in terms of what was accomplished, lessons learned, and what remains to be done in order to achieve similar successes in ECS and other programs. We discuss the importance and benefits of advanced scheduling tools, and our progress toward realizing them, through examples and illustrations based on ECS requirements. The first part of the paper focuses on the Data Archive and Distribution (DADS) V0 Scheduler. We then discuss system integration issues ranging from communication with the scheduler to the monitoring of system events and re-scheduling in response to them. The challenge of adapting the scheduler to domain-specific features and scheduling policies is also considered. Extrapolation to the ECS domain raises issues of integrating scheduling with a product-generation planner (such as PlaSTiC), and implementing conditional planning in an operational system. We conclude by briefly noting ongoing technology development and deployment projects being undertaken by HTC and the ISTB.

  3. Day-On, Day-Off emtricitabine, tenofovir disoproxil fumarate and efavirenz single tablet regimen (DODO) as maintenance therapy in HIV-infected patients.

    PubMed

    Costantini, Andrea; Tontini, Chiara; Rocchi, Monia; Martini, Matteo; Butini, Luca

    2018-06-01

    Reduced dose schedules may be feasible options to simplify antiretroviral therapy (ART) in selected HIV-1-infected individuals. Efficacy and safety of a Day-on, Day-off (DODO) schedule of tenofovir disoproxil fumarate, emtricitabine and efavirenz (FTC/TDF/EFV) single tablet regimen (STR) was assessed. Twenty-seven patients were prescribed the DODO schedule and were monitored for 48 weeks. Switching criteria were: no previous ART failure, no AIDS-defining illnesses, T CD4 cell nadir >200/mmc, and HIV-RNA below detection limit (40 copies/mL) for at least six months. Clinical and laboratory data, including plasma HIV-RNA levels, T CD4 and CD8 counts, liver and kidney function, lipid levels and ultrasensitive C-reactive protein (us-CRP) were assessed at baseline, week 4, 12, 24, and 48. Statistical analysis was performed by paired Student's T-test for comparison between baseline and each time point and Chi square test for CD4/CD8 ratio comparison. In all, 26 out of 27 patients maintained plasma HIV-RNA levels below the detection limit through the entire follow-up. One patient experienced low level plasma HIV-RNA rebound at week 36 (47 copies/ml) and immediately reverted to the conventional dose schedule of FTC/TDF/EFV; plasma HIV-RNA was undetectable after four weeks. No major changes on liver and kidney function tests, lipid levels and us-CRP were observed. Although no profound modifications of T CD4 count were observed during follow-up, the CD4/CD8 ratio increased significantly at week 48 compared to the baseline (p<0.05). In conclusion, 48-week DODO administration of the fixed dose FTC/TDF/EFV STR combination was safe and effective in maintaining HIV viral replication below the detection limit in a selected group of HIV-1-infected individuals.

  4. 7 CFR 275.20 - ME review schedules.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...

  5. 7 CFR 275.20 - ME review schedules.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...

  6. 7 CFR 275.20 - ME review schedules.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...

  7. 7 CFR 275.20 - ME review schedules.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...

  8. Generically Used Expert Scheduling System (GUESS): User's Guide Version 1.0

    NASA Technical Reports Server (NTRS)

    Liebowitz, Jay; Krishnamurthy, Vijaya; Rodens, Ira

    1996-01-01

    This user's guide contains instructions explaining how to best operate the program GUESS, a generic expert scheduling system. GUESS incorporates several important features for a generic scheduler, including automatic scheduling routines to generate a 'first' schedule for the user, a user interface that includes Gantt charts and enables the human scheduler to manipulate schedules manually, diagnostic report generators, and a variety of scheduling techniques. The current version of GUESS runs on an IBM PC or compatible in the Windows 3.1 or Windows '95 environment.

  9. National Airspace System : status of FAA's Standard Terminal Automation Replacement System

    DOT National Transportation Integrated Search

    2002-09-01

    Comparing the currently projected cost and deployment schedule for : STARS with the original cost and schedule is difficult because the program : presently bears little resemblance to the program envisioned in 1996. At : that time, FAA contracted wit...

  10. Preliminary Solar Sail Design and Fabrication Assessment: Spinning Sail Blade, Square Sail Sheet

    NASA Technical Reports Server (NTRS)

    Daniels, J. B.; Dowdle, D. M.; Hahn, D. W.; Hildreth, E. N.; Lagerquist, D. R.; Mahagnoul, E. J.; Munson, J. B.; Origer, T. F.

    1977-01-01

    The designs and fabrication methods, equipment, facilities, economics, and schedules, for the square sail sheet alternate are evaluated. The baseline for the spinning sail blade design and related fabrication issues are assessed.

  11. Commercial Network Television: Strategies for Programming and the Content of Prime Time TV, 1976-1979.

    ERIC Educational Resources Information Center

    Austin, Bruce A.

    The 1976-79 schedules of the three major television networks were analyzed to determine what strategies were used to organize prime time schedules and what types of programs appeared during prime time viewing periods. Five essential programing strategies were identified: fraction of selection (cost versus reward), lowest common denominator (wide…

  12. 20 CFR 402.175 - Fees for providing information and related services for non-program purposes.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... related services for non-program purposes. (a) General. Section 1106(c) of the Social Security Act permits... (including costs of duplication) of providing information and related services under section 1106(c) of the... described in paragraph (c) of this section. (c) Fee schedule. Our fee schedule for non-program related...

  13. An alternate property tax program requiring a forest management plan and scheduled harvesting

    Treesearch

    D.F. Dennis; P.E. Sendak

    1991-01-01

    Vermont's Use Value Appraisal property tax program, designed to address problems such as tax inequity and forced development caused by taxing agricultural and forest land based on speculative values, requires a forest management plan and scheduled harvests. A probit analysis of enrollment provides evidence of the program's success in attracting large parcels...

  14. [Mental health in physicians doing the rural and suburban health service in Peru: a baseline study].

    PubMed

    Galán-Rodas, Edén; Gálvez-Buccollini, Juan Antonio; Vega-Galdós, Favio; Osada, Jorge; Guerrero-Padilla, Daisy; Vega-Dienstmaier, Johann; Talledo, Lety; Catacora, Manuel; Fiestas, Fabián

    2011-06-01

    The disadvantageous conditions in which young physicians have to do their rural and sub-urban health service (SERUMS) may put them in a high risk for mental disorders. This study aims to establish the baseline levels of depression and alcohol use problems among those physicians scheduled to complete their SERUMS during the period 2011-2012. The Center for Epidemiologic Studies Depression Scale (CES-D) and the Alcohol Use Disorders Identification Test (AUDIT) were administered as screening tests to 493 physicians. Depression scores were met by 26% females and 14.5% males, and alcohol use problem scores were met by 22% females and 26% males. Overall, 39% persons scored for either of both mental health entities. Mental health problems seem to be common among young physicians scheduled to migrate to their SERUMS. These problems must be addressed to avoid greater risks.

  15. USAF Summer Research Program - 1994 Summer Faculty Research Program, Final Reports, Volume 5A, Wright Laboratory

    DTIC Science & Technology

    1994-12-01

    Developing an Object-oriented S DRGuoxiangGu WL/MNAG 5- 24 Louisiana State University , Baton Rouge , LA Gain Scheduled Missile Autopilot...candidates being notified of their acceptance after scheduled deadlines. The total applicants and participants for 1994 are shown in this table. Table 2...planning and scheduling literature to identify developments that might apply to the design of a sensor manager. Applications examined primarily come

  16. Automated Platform Management System Scheduling

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1990-01-01

    The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our work and results may be outdated when this paper is published.

  17. Requirements for the implementation of schedule repair technology in the Experiment Scheduling Program

    NASA Technical Reports Server (NTRS)

    Bullington, Stanley F.

    1992-01-01

    The following list of requirements specifies the proposed revisions to the Experiment Scheduling Program (ESP2) which deal with schedule repair. These requirements are divided into those which are general in nature, those which relate to measurement and analysis functions of the software, those which relate specifically to conflict resolution, and those relating directly to the user interface. (This list is not a complete list of requirements for the user interface, but only a list of those schedule repair requirements which relate to the interface.) Some of the requirements relate only to uses of the software in real-time operations. Others are clearly for future versions of the software, beyond the upcoming revision. In either case, the fact will be clearly stated.

  18. Development of a Dynamic Time Sharing Scheduled Environment Final Report CRADA No. TC-824-94E

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jette, M.; Caliga, D.

    Massively parallel computers, such as the Cray T3D, have historically supported resource sharing solely with space sharing. In that method, multiple problems are solved by executing them on distinct processors. This project developed a dynamic time- and space-sharing scheduler to achieve greater interactivity and throughput than could be achieved with space-sharing alone. CRI and LLNL worked together on the design, testing, and review aspects of this project. There were separate software deliverables. CFU implemented a general purpose scheduling system as per the design specifications. LLNL ported the local gang scheduler software to the LLNL Cray T3D. In this approach, processorsmore » are allocated simultaneously to aU components of a parallel program (in a “gang”). Program execution is preempted as needed to provide for interactivity. Programs are also reIocated to different processors as needed to efficiently pack the computer’s torus of processors. In phase one, CRI developed an interface specification after discussions with LLNL for systemlevel software supporting a time- and space-sharing environment on the LLNL T3D. The two parties also discussed interface specifications for external control tools (such as scheduling policy tools, system administration tools) and applications programs. CRI assumed responsibility for the writing and implementation of all the necessary system software in this phase. In phase two, CRI implemented job-rolling on the Cray T3D, a mechanism for preempting a program, saving its state to disk, and later restoring its state to memory for continued execution. LLNL ported its gang scheduler to the LLNL T3D utilizing the CRI interface implemented in phases one and two. During phase three, the functionality and effectiveness of the LLNL gang scheduler was assessed to provide input to CRI time- and space-sharing, efforts. CRI will utilize this information in the development of general schedulers suitable for other sites and future architectures.« less

  19. International mission planning for space Very Long Baseline Interferometry

    NASA Technical Reports Server (NTRS)

    Ulvestad, James S.

    1994-01-01

    Two spacecraft dedicated to Very Long Baseline Interferometry (VLBI) will be launched in 1996 and 1997 to make observations using baselines between the space telescopes and many of the world's ground radio telescopes. The Japanese Institute of Space and Astronautical Science (ISAS) will launch VSOP (VLBI Space Observatory Program) in September 1996, while the Russian Astro Space Center (ASC) is scheduled to launch RadioAstron in 1997. Both spacecraft will observe radio sources at frequencies near 1.7, 4.8, and 22 GHz; RadioAstron will also observe at 0.33 GHz. The baselines between space and ground telescopes will provide 3-10 times the resolution available for ground VLBI at the same observing frequencies. Ground tracking stations on four continents will supply the required precise frequency reference to each spacecraft measure the two-way residual phase and Doppler on the ground-space link, and record 128 Megabit/s of VLBI data downlinked from the spacecraft. The spacecraft data are meaningless without cross-correlation against the data from Earth-bound telescopes, which must take place at special-purpose VLBI correlation facilities. Therefore, participation by most of the world's radio observatories is needed to achieve substantial science return from VSOP and RadioAstron. The collaboration of several major space agencies and the ground observatories, which generally follow very different models for allocation of observing time and for routine operations, leads to great complexity in mission planning and in day-to-day operations. This paper describes some of those complications and the strategies being developed to assure productive scientific missions.

  20. Sleep Well!: A Pilot Study of an Education Campaign to Improve Sleep of Socioeconomically Disadvantaged Children.

    PubMed

    Mindell, Jodi A; Sedmak, Rebecca; Boyle, Julia T; Butler, Rachel; Williamson, Ariel A

    2016-12-15

    Socioeconomically disadvantaged children are at risk for poor sleep hygiene and increased sleep problems. This pilot study examined the efficacy of Sleep Well!, a parent-based sleep education endeavor, which supplemented an outreach program that provides beds to socioeconomically disadvantaged children. In addition to receiving a bed, 152 children (mean age = 5.95 years, 57.2% boys) were randomly assigned to sleep education (3 messages: bedtime before 21:00; no caffeine; keep electronics out of the bedroom) or control (dental hygiene education) conditions. All education was provided at both the time of scheduling and delivery of a bed to each child. Parent-reported sleep data were collected at baseline and at 4-week follow-up. Provision of a bed was associated with reduced bedroom electronics and increased parent-reported nighttime sleep duration for all children. However, relative to control children, intervention children showed even greater reductions in electronics (baseline mean = 1.91 items, follow-up mean = 0.85 items) and improvements in sleep duration (baseline mean = 9.75 hours, follow-up mean = 10.19 hours). There was no intervention effect for caffeine consumption or bedtime from baseline to follow-up. Providing beds to socioeconomically disadvantaged children resulted in increased sleep duration and decreased use of electronics at bedtime, while the combination of a bed and brief parent sleep education conferred additional sleep benefits. Further study of brief child sleep interventions is warranted, particularly among socioeconomically disadvantaged children who are at risk for sleep problems. © 2016 American Academy of Sleep Medicine

  1. Software for Planning Scientific Activities on Mars

    NASA Technical Reports Server (NTRS)

    Ai-Chang, Mitchell; Bresina, John; Jonsson, Ari; Hsu, Jennifer; Kanefsky, Bob; Morris, Paul; Rajan, Kanna; Yglesias, Jeffrey; Charest, Len; Maldague, Pierre

    2003-01-01

    Mixed-Initiative Activity Plan Generator (MAPGEN) is a ground-based computer program for planning and scheduling the scientific activities of instrumented exploratory robotic vehicles, within the limitations of available resources onboard the vehicle. MAPGEN is a combination of two prior software systems: (1) an activity-planning program, APGEN, developed at NASA s Jet Propulsion Laboratory and (2) the Europa planner/scheduler from NASA Ames Research Center. MAPGEN performs all of the following functions: Automatic generation of plans and schedules for scientific and engineering activities; Testing of hypotheses (or what-if analyses of various scenarios); Editing of plans; Computation and analysis of resources; and Enforcement and maintenance of constraints, including resolution of temporal and resource conflicts among planned activities. MAPGEN can be used in either of two modes: one in which the planner/scheduler is turned off and only the basic APGEN functionality is utilized, or one in which both component programs are used to obtain the full planning, scheduling, and constraint-maintenance functionality.

  2. Using the principles of circadian physiology enhances shift schedule design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Connolly, J.J.; Moore-Ede, M.C.

    1987-01-01

    Nuclear power plants must operate 24 h, 7 days a week. For the most part, shift schedules currently in use at nuclear power plants have been designed to meet operational needs without considering the biological clocks of the human operators. The development of schedules that also take circadian principles into account is a positive step that can be taken to improve plant safety by optimizing operator alertness. These schedules reduce the probability of human errors especially during backshifts. In addition, training programs that teach round-the-clock workers how to deal with the problems of shiftwork can help to optimize performance andmore » alertness. These programs teach shiftworkers the underlying causes of the sleep problems associated with shiftwork and also provide coping strategies for improving sleep and dealing with the transition between shifts. When these training programs are coupled with an improved schedule, the problems associated with working round-the-clock can be significantly reduced.« less

  3. Trajectories of Substance Use Disorder in Youth After Detention: A 12-Year Longitudinal Study

    PubMed Central

    Welty, Leah J.; Hershfield, Jennifer A.; Abram, Karen M.; Han, Hongyun; Byck, Gayle R.; Teplin, Linda A.

    2016-01-01

    Objective Identify trajectories of substance use disorders (SUDs) in youth during the 12 years after detention, and how gender, race/ethnicity, and age at baseline predict trajectories. Method As part of the Northwestern Juvenile Project, a longitudinal study of 1,829 youth randomly sampled from detention in Chicago, Illinois, 1995–1998, participants were re-interviewed in the community or correctional facilities up to 9 times over 12 years. Independent interviewers assessed SUDs using the Diagnostic Interview Schedule for Children 2.3 (baseline) and the Diagnostic Interview Schedule IV (follow-ups). Primary outcome was a mutually exclusive 5-category typology of disorder: no SUD, alcohol alone, marijuana alone, comorbid alcohol and marijuana, or “other” illicit (“hard”) drug. We estimated trajectories using growth mixture models with a 3-category ordinal variable derived from the typology. Results During the 12-year follow-up, 19.6% of youth did not have an SUD. The remaining 81.4% were in 3 trajectory classes. Class 1 (24.5%), a bell-shaped trajectory, peaked 5 years after baseline when 42.7% had an SUD and 12.5% had comorbid/“other” illicit drug disorders. Class 2 (41.3%) had higher prevalence of SUD at baseline (73.8%). Although prevalence decreased over time, 23.5% had an SUD 12 years later. Class 3 (14.6%), the most serious and persistent trajectory, had the highest prevalence of comorbid/“other” illicit drug disorders—52.1% at baseline and 17.4% 12 years later. Males, Hispanics, non-Hispanic whites, and youth who were older at baseline (detention) had the worst outcomes. Conclusion Gender, race/ethnicity, and age at detention predict trajectories of SUDs in delinquent youth. Findings provide an empirical basis for child psychiatry to address health disparities and improve prevention. PMID:28117060

  4. 32 CFR 286.28 - General provisions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OF INFORMATION ACT PROGRAM DOD FREEDOM OF INFORMATION ACT PROGRAM REGULATION Fee Schedule § 286.28 General provisions. (a) Authorities. The Freedom of Information Act, as amended; the Paperwork Reduction... the Office of Management and Budget Uniform Freedom of Information Act Fee Schedule and Guidelines...

  5. 32 CFR 286.28 - General provisions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OF INFORMATION ACT PROGRAM DOD FREEDOM OF INFORMATION ACT PROGRAM REGULATION Fee Schedule § 286.28 General provisions. (a) Authorities. The Freedom of Information Act, as amended; the Paperwork Reduction... the Office of Management and Budget Uniform Freedom of Information Act Fee Schedule and Guidelines...

  6. 32 CFR 286.28 - General provisions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OF INFORMATION ACT PROGRAM DOD FREEDOM OF INFORMATION ACT PROGRAM REGULATION Fee Schedule § 286.28 General provisions. (a) Authorities. The Freedom of Information Act, as amended; the Paperwork Reduction... the Office of Management and Budget Uniform Freedom of Information Act Fee Schedule and Guidelines...

  7. 40 CFR 122.47 - Schedules of compliance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Schedules of compliance. 122.47 Section 122.47 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM Permit Conditions § 122.47...

  8. 40 CFR 122.47 - Schedules of compliance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Schedules of compliance. 122.47 Section 122.47 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM Permit Conditions § 122.47...

  9. NASA's Space Launch System: Momentum Builds Towards First Launch

    NASA Technical Reports Server (NTRS)

    May, Todd; Lyles, Garry

    2014-01-01

    NASA's Space Launch System (SLS) is gaining momentum programmatically and technically toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. Its first mission will be the launch of the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back. SLS will also launch the first Orion crewed flight in 2021. SLS can evolve to a 130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Managed by NASA's Marshall Space Flight Center, the SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. At KDP-C, the Agency Planning Management Council determines the readiness of a program to go to the next life-cycle phase and makes technical, cost, and schedule commitments to its external stakeholders. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015, and a launch readiness date of November 2018. Every SLS element is currently in testing or test preparations. The Program shipped its first flight hardware in 2014 in preparation for Orion's Exploration Flight Test-1 (EFT-1) launch on a Delta IV Heavy rocket in December, a significant first step toward human journeys into deep space. Accomplishments during 2014 included manufacture of Core Stage test articles and preparations for qualification testing the Solid Rocket Boosters and the RS-25 Core Stage engines. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States has already made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program technical accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

  10. Best Practices for Fatigue Risk Management in Non-Traditional Shiftwork

    NASA Technical Reports Server (NTRS)

    Flynn-Evans, Erin E.

    2016-01-01

    Fatigue risk management programs provide effective tools to mitigate fatigue among shift workers. Although such programs are effective for typical shiftwork scenarios, where individuals of equal skill level can be divided into shifts to cover 24 hour operations, traditional programs are not sufficient for managing sleep loss among individuals with unique skill sets, in occupations where non-traditional schedules are required. Such operations are prevalent at NASA and in other high stress occupations, including among airline pilots, military personnel, and expeditioners. These types of operations require fatigue risk management programs tailored to the specific requirements of the mission. Without appropriately tailored fatigue risk management, such operations can lead to an elevated risk of operational failure, disintegration of teamwork, and increased risk of accidents and incidents. In order to design schedules for such operations, schedule planners must evaluate the impact of a given operation on circadian misalignment, acute sleep loss, chronic sleep loss and sleep inertia. In addition, individual-level factors such as morningness-eveningness preference and sleep disorders should be considered. After the impact of each of these factors has been identified, scheduling teams can design schedules that meet operational requirements, while also minimizing fatigue.

  11. Automating Mid- and Long-Range Scheduling for NASA's Deep Space Network

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Tran, Daniel; Arroyo, Belinda; Sorensen, Sugi; Tay, Peter; Carruth, Butch; Coffman, Adam; Wallace, Mike

    2012-01-01

    NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system is architected as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users who utilize the DSN (representing 37 projects including international partners and ground-based science and calibration users). The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. S(sup 3) has been used for negotiating schedules since April 2011, including the baseline schedules for three launching missions in late 2011. S(sup 3) supports a distributed scheduling model, in which changes can potentially be made by multiple users based on multiple schedule "workspaces" or versions of the schedule. This has led to several challenges in the design of the scheduling database, and of a change proposal workflow that allows users to concur with or to reject proposed schedule changes, and then counter-propose with alternative or additional suggested changes. This paper describes some key aspects of the S(sup 3) system and lessons learned from its operational deployment to date, focusing on the challenges of multi-user collaborative scheduling in a practical and mission-critical setting. We will also describe the ongoing project to extend S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

  12. Surprise Benefits of Arena Scheduling

    ERIC Educational Resources Information Center

    Surloff, Andrew

    2008-01-01

    One of the most challenging tasks a principal must accomplish every year is the construction of the master schedule. Free from the magnetic scheduling boards and wall charts of yesteryear, principals now have technological tools--such as programs that offer schools solutions for their scheduling needs--that can save time and enable them to work…

  13. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...

  14. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...

  15. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...

  16. Future applications of artificial intelligence to Mission Control Centers

    NASA Technical Reports Server (NTRS)

    Friedland, Peter

    1991-01-01

    Future applications of artificial intelligence to Mission Control Centers are presented in the form of the viewgraphs. The following subject areas are covered: basic objectives of the NASA-wide AI program; inhouse research program; constraint-based scheduling; learning and performance improvement for scheduling; GEMPLAN multi-agent planner; planning, scheduling, and control; Bayesian learning; efficient learning algorithms; ICARUS (an integrated architecture for learning); design knowledge acquisition and retention; computer-integrated documentation; and some speculation on future applications.

  17. SURE (Science User Resource Expert): A science planning and scheduling assistant for a resource based environment

    NASA Technical Reports Server (NTRS)

    Thalman, Nancy E.; Sparn, Thomas P.

    1990-01-01

    SURE (Science User Resource Expert) is one of three components that compose the SURPASS (Science User Resource Planning and Scheduling System). This system is a planning and scheduling tool which supports distributed planning and scheduling, based on resource allocation and optimization. Currently SURE is being used within the SURPASS by the UARS (Upper Atmospheric Research Satellite) SOLSTICE instrument to build a daily science plan and activity schedule and in a prototyping effort with NASA GSFC to demonstrate distributed planning and scheduling for the SOLSTICE II instrument on the EOS platform. For the SOLSTICE application the SURE utilizes a rule-based system. Development of a rule-based program using Ada CLIPS as opposed to using conventional programming, allows for capture of the science planning and scheduling heuristics in rules and provides flexibility in inserting or removing rules as the scientific objectives and mission constraints change. The SURE system's role as a component in the SURPASS, the purpose of the SURE planning and scheduling tool, the SURE knowledge base, and the software architecture of the SURE component are described.

  18. Scheduling IT Staff at a Bank: A Mathematical Programming Approach

    PubMed Central

    Labidi, M.; Mrad, M.; Gharbi, A.; Louly, M. A.

    2014-01-01

    We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT) staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules. PMID:24772032

  19. Scheduling IT staff at a bank: a mathematical programming approach.

    PubMed

    Labidi, M; Mrad, M; Gharbi, A; Louly, M A

    2014-01-01

    We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT) staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules.

  20. A Novel Collaboration to Reduce the Travel-Related Cost of Residency Interviewing.

    PubMed

    Shappell, Eric; Fant, Abra; Schnapp, Benjamin; Craig, Jill P; Ahn, James; Babcock, Christine; Gisondi, Michael A

    2017-04-01

    Interviewing for residency is a complicated and often expensive endeavor. Literature has estimated interview costs of $4,000 to $15,000 per applicant, mostly attributable to travel and lodging. The authors sought to reduce these costs and improve the applicant interview experience by coordinating interview dates between two residency programs in Chicago, Illinois. Two emergency medicine residency programs scheduled contiguous interview dates for the 2015-2016 interview season. We used a survey to assess applicant experiences interviewing in Chicago and attitudes regarding coordinated scheduling. Data on utilization of coordinated dates were obtained from interview scheduling software. The target group for this intervention consisted of applicants from medical schools outside Illinois who completed interviews at both programs. Of the 158 applicants invited to both programs, 84 (53%) responded to the survey. Scheduling data were available for all applicants. The total estimated cost savings for target applicants coordinating interview dates was $13,950. The majority of target applicants reported that this intervention increased the ease of scheduling (84%), made them less likely to cancel the interview (82%), and saved them money (71%). Coordinated scheduling of interview dates was associated with significant estimated cost savings and was reviewed favorably by applicants across all measures of experience. Expanding use of this practice geographically and across specialties may further reduce the cost of interviewing for applicants.

  1. STS-58 crewmembers participate in baseline data collection

    NASA Image and Video Library

    1993-09-29

    S93-45376 (29 Sept 1993) --- Astronaut Rhea Seddon, STS-58 payload commander, participates in data collection for neurovestibular functions. The data collection process was in preparation for the Spacelab Life Sciences (SLS-2) flight scheduled for next month.

  2. A model for estimating the cost impact of schedule perturbations on aerospace research and development programs

    NASA Technical Reports Server (NTRS)

    Bishop, D. F.

    1972-01-01

    The problem of determining the cost impact attributable to perturbations in an aerospace R and D program schedule is discussed in terms of the diminishing availability of funds. The methodology from which a model is presented for updating R and D cost estimates as a function of perturbations in program time is presented.

  3. Airspace Technology Demonstration 2 (ATD-2) Phase 1 Concept of Use (ConUse)

    NASA Technical Reports Server (NTRS)

    Jung, Yoon; Engelland, Shawn; Capps, Richard; Coppenbarger, Rich; Hooey, Becky; Sharma, Shivanjli; Stevens, Lindsay; Verma, Savita; Lohr, Gary; Chevalley, Eric; hide

    2018-01-01

    This document presents an operational Concept of Use (ConUse) for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, which began demonstration in 2017 at Charlotte Douglas International Airport (CLT). NASA is developing the IADS system under the ATD-2 sub-project in coordination with the Federal Aviation Administration (FAA) and aviation industry partners. The primary goal of ATD-2 sub-project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 effort is a five-year research activity through 2020. The initial phase of the ATD-2 sub-project, which is the focus of this document, will demonstrate the Phase 1 Baseline IADS capability at CLT in 2017. The Phase 1 Baseline IADS capabilities of the ATD-2 sub-project consists of: (a) Strategic and tactical surface scheduling to improve efficiency and predictability of airport surface operations, (b) Tactical departure scheduling to enhance merging of departures into overhead traffic streams via accurate predictions of takeoff times and automated coordination between the Airport Traffic Control Tower (ATCT, or Tower) and the Air Route Traffic Control Center (ARTCC, or Center), (c) Improvements in departure surface demand predictions in Time Based Flow Management (TBFM), (d) A prototype Electronic Flight Data (EFD) system provided by the FAA via the Terminal Flight Data Manager (TFDM) early implementation effort, and (e) Improved situational awareness and demand predictions through integration with the Traffic Flow Management System (TFMS), TBFM, and TFDM (3Ts) for electronic data integration and exchange, and an on-screen dashboard displaying pertinent analytics in real-time. The surface scheduling and metering element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 Upon successful demonstration of the Phase 1 Baseline IADS capability, follow-on demonstrations of the matured IADS traffic management capabilities will be conducted in the 2018-2020 timeframe. At the end of each phase of the demonstrations, NASA will transfer the ATD-2 sub-project technology to the FAA and industry partners.

  4. NextGen Operations in a Simulated NY Area Airspace

    NASA Technical Reports Server (NTRS)

    Smith, Nancy M.; Parke, Bonny; Lee, Paul; Homola, Jeff; Brasil, Connie; Buckley, Nathan; Cabrall, Chris; Chevalley, Eric; Lin, Cindy; Morey, Susan; hide

    2013-01-01

    A human-in-the-loop simulation conducted in the Airspace Operations Laboratory (AOL) at NASA Ames Research Center explored the feasibility of a Next Generation Air Transportation System (NextGen) solution to address airspace and airport capacity limitations in and around the New York metropolitan area. A week-long study explored the feasibility of a new Optimal Profile Descent (OPD) arrival into the airspace as well as a novel application of a Terminal Area Precision Scheduling and Spacing (TAPSS) enhancement to the Traffic Management Advisor (TMA) arrival scheduling tool to coordinate high volume arrival traffic to intersecting runways. In the simulation, four en route sector controllers and four terminal radar approach control (TRACON) controllers managed traffic inbound to Newark International Airport's primary runway, 22L, and its intersecting overflow runway, 11. TAPSS was used to generate independent arrival schedules for each runway and a traffic management coordinator participant adjusted the arrival schedule for each runway 11 aircraft to follow one of the 22L aircraft. TAPSS also provided controller-managed spacing tools (slot markers with speed advisories and timelines) to assist the TRACON controllers in managing the arrivals that were descending on OPDs. Results showed that the tools significantly decreased the occurrence of runway violations (potential go-arounds) when compared with a Baseline condition with no tools. Further, the combined use of the tools with the new OPD produced a peak arrival rate of over 65 aircraft per hour using instrument flight rules (IFR), exceeding the current maximum arrival rate at Newark Liberty International Airport (EWR) of 52 per hour under visual flight rules (VFR). Although the participants rated the workload as relatively low and acceptable both with and without the tools, they rated the tools as reducing their workload further. Safety and coordination were rated by most participants as acceptable in both conditions, although the TRACON Runway Coordinator (TRC) rated neither as acceptable in the Baseline condition. Regarding the role of the TRC, the two TRACON controllers handling the 11 arrivals indicated that the TRC was very much needed in the Baseline condition without tools, but not needed in the condition with tools. This indicates that the tools were providing much of the sequencing and spacing information that the TRC had supplied in the Baseline condition.

  5. Systems cost/performance analysis (study 2.3). Volume 2: Systems cost/performance model. [unmanned automated payload programs and program planning

    NASA Technical Reports Server (NTRS)

    Campbell, B. H.

    1974-01-01

    A methodology which was developed for balanced designing of spacecraft subsystems and interrelates cost, performance, safety, and schedule considerations was refined. The methodology consists of a two-step process: the first step is one of selecting all hardware designs which satisfy the given performance and safety requirements, the second step is one of estimating the cost and schedule required to design, build, and operate each spacecraft design. Using this methodology to develop a systems cost/performance model allows the user of such a model to establish specific designs and the related costs and schedule. The user is able to determine the sensitivity of design, costs, and schedules to changes in requirements. The resulting systems cost performance model is described and implemented as a digital computer program.

  6. 47 CFR 73.1510 - Experimental authorizations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Experimental authorizations. 73.1510 Section 73... conducted at any time the station is authorized to operate, but the minimum required schedule of programming... regularly scheduled programming concurrently with the experimental transmission if there is no significant...

  7. 47 CFR 73.1510 - Experimental authorizations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Experimental authorizations. 73.1510 Section 73... conducted at any time the station is authorized to operate, but the minimum required schedule of programming... regularly scheduled programming concurrently with the experimental transmission if there is no significant...

  8. 10 CFR 490.201 - Alternative fueled vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Alternative fueled vehicle acquisition mandate schedule. 490.201 Section 490.201 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.201 Alternative fueled vehicle acquisition mandate...

  9. 10 CFR 490.201 - Alternative fueled vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Alternative fueled vehicle acquisition mandate schedule. 490.201 Section 490.201 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.201 Alternative fueled vehicle acquisition mandate...

  10. 10 CFR 490.201 - Alternative fueled vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Alternative fueled vehicle acquisition mandate schedule. 490.201 Section 490.201 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.201 Alternative fueled vehicle acquisition mandate...

  11. 10 CFR 490.201 - Alternative fueled vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Alternative fueled vehicle acquisition mandate schedule. 490.201 Section 490.201 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.201 Alternative fueled vehicle acquisition mandate...

  12. 10 CFR 490.201 - Alternative fueled vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Alternative fueled vehicle acquisition mandate schedule. 490.201 Section 490.201 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.201 Alternative fueled vehicle acquisition mandate...

  13. Creation of the selection list for the Experiment Scheduling Program (ESP)

    NASA Technical Reports Server (NTRS)

    Deuermeyer, B. L.; Shannon, R. E.; Underbrink, A. J., Jr.

    1986-01-01

    The efforts to develop a procedure to construct selection groups to augment the Experiment Scheduling Program (ESP) are summarized. Included is a User's Guide and a sample scenario to guide in the use of the software system that implements the developed procedures.

  14. Exploiting loop level parallelism in nonprocedural dataflow programs

    NASA Technical Reports Server (NTRS)

    Gokhale, Maya B.

    1987-01-01

    Discussed are how loop level parallelism is detected in a nonprocedural dataflow program, and how a procedural program with concurrent loops is scheduled. Also discussed is a program restructuring technique which may be applied to recursive equations so that concurrent loops may be generated for a seemingly iterative computation. A compiler which generates C code for the language described below has been implemented. The scheduling component of the compiler and the restructuring transformation are described.

  15. Systems level feasibility study for the detection of extra-solar planets. Volume 1: Infrared interferometer (IRIS) known as the Stanford Concept

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A sensor system for the direct detection of extrasolar planets from an Earth orbit is evaluated: a spinning, infrared interferometer (IRIS). It is shuttle deployed, free flying, requires no on-orbit assembly and no reservicing over a design life of five years. The sensor concept and the mission objectives are reviewed, and the performance characteristics of a baseline sensor for standard observation conditions are derived. A baseline sensor design is given and the enabling technology discussed. Cost and weight estimates are performed; and a schedule for an IRIS program including technology development and assessment of risk are given. Finally, the sensor is compared with the apodized visual telescope sensor (APOTS) proposed for the same mission. The major conclusions are: that with moderate to strong technology advances, particularly in the fields of long life cryogenics, dynamical control, mirror manufacturing, and optical alignment, the detection of a Jupiter like planet around a Sunlike star at a distance of 30 light years is feasible, with a 3 meter aperture and an observation time of 1 hour. By contrast, major and possibly unlikely breakthroughs in mirror technology are required for APOTS to match this performance.

  16. A computer method for schedule processing and quick-time updating.

    NASA Technical Reports Server (NTRS)

    Mccoy, W. H.

    1972-01-01

    A schedule analysis program is presented which can be used to process any schedule with continuous flow and with no loops. Although generally thought of as a management tool, it has applicability to such extremes as music composition and computer program efficiency analysis. Other possibilities for its use include the determination of electrical power usage during some operation such as spacecraft checkout, and the determination of impact envelopes for the purpose of scheduling payloads in launch processing. At the core of the described computer method is an algorithm which computes the position of each activity bar on the output waterfall chart. The algorithm is basically a maximal-path computation which gives to each node in the schedule network the maximal path from the initial node to the given node.

  17. The Associate Principal Astronomer for AI Management of Automatic Telescopes

    NASA Technical Reports Server (NTRS)

    Henry, Gregory W.

    1998-01-01

    This research program in scheduling and management of automatic telescopes had the following objectives: 1. To field test the 1993 Automatic Telescope Instruction Set (ATIS93) programming language, which was specifically developed to allow real-time control of an automatic telescope via an artificial intelligence scheduler running on a remote computer. 2. To develop and test the procedures for two-way communication between a telescope controller and remote scheduler via the Internet. 3. To test various concepts in Al scheduling being developed at NASA Ames Research Center on an automatic telescope operated by Tennessee State University at the Fairborn Observatory site in southern Arizona. and 4. To develop a prototype software package, dubbed the Associate Principal Astronomer, for the efficient scheduling and management of automatic telescopes.

  18. Status and Plans for the Vienna VLBI and Satellite Software (VieVS 3.0)

    NASA Astrophysics Data System (ADS)

    Gruber, Jakob; Böhm, Johannes; Böhm, Sigrid; Girdiuk, Anastasiia; Hellerschmied, Andreas; Hofmeister, Armin; Krásná, Hana; Kwak, Younghee; Landskron, Daniel; Madzak, Matthias; Mayer, David; McCallum, Jamie; Plank, Lucia; Schartner, Matthias; Shabala, Stas; Teke, Kamil; Sun, Jing

    2017-04-01

    The Vienna VLBI and Satellite Software (VieVS) is a geodetic analysis software developed and maintained at Technische Universität Wien (TU Wien) with contributions from groups all over the world. It is used for both academic purposes in university courses as well as for providing Very Long Baseline Interferometry (VLBI) analysis results to the geodetic community. Written in a modular structure in Matlab, VieVS offers easy access to the source code and the possibility to adapt the programs for particular purposes. The new version 3.0, released in early 2017, includes several new features, e.g., improved scheduling capabilities for observing quasars and satellites. This poster gives an overview of all VLBI-related activities in Vienna and provides an outlook to future plans concerning the Vienna VLBI and Satellite Software (VieVS).

  19. Empirically derived pain-patient MMPI subgroups: prediction of treatment outcome.

    PubMed

    Moore, J E; Armentrout, D P; Parker, J C; Kivlahan, D R

    1986-02-01

    Fifty-seven male chronic pain patients admitted to an inpatient multimodal pain treatment program at a Midwestern Veterans Administration hospital completed the MMPI, Profile of Mood States (POMS), Tennessee Self-Concept Scale (TSCS), Rathus Assertiveness Schedule (RAS), activity diaries, and an extensive pain questionnaire. All patients were assessed both before and after treatment, and most also were assessed 2-5 months prior to treatment. No significant changes occurred during the baseline period, but significant improvements were evident at posttreatment on most variables: MMPI, POMS, TSCS, RAS, pain severity, sexual functioning, and activity diaries. MMPI subgroup membership, based on a hierarchical cluster analysis in a larger sample, was not predictive of differential treatment outcome. Possible reasons for comparable treatment gains among these subgroups, which previously have been shown to differ on many psychological and behavioral factors, are discussed.

  20. Facilitators and barriers to employment among veterans with spinal cord injury receiving 12 months of evidence-based supported employment services.

    PubMed

    Cotner, Bridget A; Njoh, Eni N; Trainor, John K; O'Connor, Danielle R; Barnett, Scott D; Ottomanelli, Lisa

    2015-01-01

    Return to work is associated with positive rehabilitation outcomes for persons with spinal cord injury (SCI); however, more research is needed on vocational support for persons with disabilities seeking employment. The association between facilitators and barriers of employment and employment outcome was examined among Veterans with SCI who participated in an evidence-based supported employment (EBSE) program. Using a mixed-methods, nested case-control design, data on facilitators and barriers to employment were extracted from qualitative interviews and quantitative measures administered in person to 34 Veterans with SCI who completed 12 months of an EBSE program. Participants who did (case) and did not (control) obtain competitive employment were matched on time since SCI. Facilitators and barriers to employment were compared between the groups. Self-report measures administered at baseline were examined; there were no statistically significant factors that predicted employment outcomes after 12 months of EBSE program participation. Qualitative interview data revealed program-specific facilitators and Veteran characteristics that were associated with employment outcomes. Qualitative data illustrate how the integration of the vocational rehabilitation specialist on the medical team is helpful for addressing identified disability-specific barriers, including practical matters such as transportation and caregiving schedules, to facilitate employment outcomes.

  1. Facilitators and Barriers to Employment Among Veterans with Spinal Cord Injury Receiving 12 Months of Evidence-Based Supported Employment Services

    PubMed Central

    Njoh, Eni N.; Trainor, John K.; O’Connor, Danielle R.; Barnett, Scott D.; Ottomanelli, Lisa

    2015-01-01

    Background: Return to work is associated with positive rehabilitation outcomes for persons with spinal cord injury (SCI); however, more research is needed on vocational support for persons with disabilities seeking employment. Objective: The association between facilitators and barriers of employment and employment outcome was examined among Veterans with SCI who participated in an evidence-based supported employment (EBSE) program. Methods: Using a mixed-methods, nested case-control design, data on facilitators and barriers to employment were extracted from qualitative interviews and quantitative measures administered in person to 34 Veterans with SCI who completed 12 months of an EBSE program. Participants who did (case) and did not (control) obtain competitive employment were matched on time since SCI. Facilitators and barriers to employment were compared between the groups. Results: Self-report measures administered at baseline were examined; there were no statistically significant factors that predicted employment outcomes after 12 months of EBSE program participation. Qualitative interview data revealed program-specific facilitators and Veteran characteristics that were associated with employment outcomes. Conclusions: Qualitative data illustrate how the integration of the vocational rehabilitation specialist on the medical team is helpful for addressing identified disability-specific barriers, including practical matters such as transportation and caregiving schedules, to facilitate employment outcomes. PMID:25762857

  2. 5 CFR 213.3402 - Entire executive civil service; Pathways Programs.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Entire executive civil service; Pathways Programs. 213.3402 Section 213.3402 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS EXCEPTED SERVICE Excepted Schedules Schedule D § 213.3402 Entire executive civil service; Pathways...

  3. 5 CFR 213.3402 - Entire executive civil service; Pathways Programs.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Entire executive civil service; Pathways Programs. 213.3402 Section 213.3402 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS EXCEPTED SERVICE Excepted Schedules Schedule D § 213.3402 Entire executive civil service; Pathways...

  4. Engineering Technician Standards.

    ERIC Educational Resources Information Center

    National Aeronautics and Space Administration, Hampton, VA. Langley Research Center.

    The booklet describes the program offerings, requirements, training, and pay schedules of the Langley Research Center Technician Training Program. Training schedules and the duties expected upon completion of each of the training areas are specified, along with on-the-job and academic requirements. The areas of training are: engineering draftsman,…

  5. TRU Waste Management Program cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    1985-10-01

    The cost/schedule optimization task is a necessary function to insure that program goals and plans are optimized from a cost and schedule aspect. Results of this study will offer DOE information with which it can establish, within institutional constraints, the most efficient program for the long-term management and disposal of contact handled transuranic waste (CH-TRU). To this end, a comprehensive review of program cost/schedule tradeoffs has been made, to identify any major cost saving opportunities that may be realized by modification of current program plans. It was decided that all promising scenarios would be explored, and institutional limitations to implementationmore » would be described. Since a virtually limitless number of possible scenarios can be envisioned, it was necessary to distill these possibilities into a manageable number of alternatives. The resultant scenarios were described in the cost/schedule strategy and work plan document. Each scenario was compared with the base case: waste processing at the originating site; transport of CH-TRU wastes in TRUPACT; shipment of drums in 6-Packs; 25 year stored waste workoff; WIPP operational 10/88, with all sites shipping to WIPP beginning 10/88; and no processing at WIPP. Major savings were identified in two alternate scenarios: centralize waste processing at INEL and eliminate rail shipment of TRUPACT. No attempt was made to calculate savings due to combination of scenarios. 1 ref., 5 figs., 1 tab. (MHB)« less

  6. Perspectives on community gardens, community kitchens and the Good Food Box program in a community-based sample of low-income families.

    PubMed

    Loopstra, Rachel; Tarasuk, Valerie

    2013-01-08

    Growing recognition of the problem of household food insecurity in Canada has meant public health practitioners are looking for effective ways to ameliorate this problem in their communities. Community gardens, community kitchens, and food box programs can offer nutritious foods for comparably lower costs, however, the uptake and perceptions of these programs in populations at risk of food insecurity have not been evaluated. Building on a previous finding of low program participation among 485 families living in high-poverty neighbourhoods in Toronto, the objective of this study was to understand reasons for non-participation. One year after the baseline study, 371 families were interviewed a second time and were asked to provide their reasons for not participating in community gardens, community kitchens, or the Good Food Box program. Responses were analyzed by inductive content analysis. At follow-up, only 12 families had participated in a community garden, 16 in a community kitchen, and 4 in the Good Food Box program. Reasons for non-participation grouped under two themes. First, families expressed that programs were not accessible because they lacked the knowledge of how or where to participate or because programs were not in their neighbourhoods. Second, programs lacked fit for families, as they were not suited to busy schedules, interests, or needs. This study provides unique perspective on participation in community food programs among food-insecure families and suggests that these programs may not be effective options for these families to improve their food access.

  7. 41 CFR 101-26.509-2 - Requisitioning tabulating machine cards not available from Federal Supply Schedule contracts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... machine cards not available from Federal Supply Schedule contracts. 101-26.509-2 Section 101-26.509-2... Programs § 101-26.509-2 Requisitioning tabulating machine cards not available from Federal Supply Schedule contracts. (a) Requisitions for tabulating machine cards covered by Federal Supply Schedule contracts which...

  8. 49 CFR Appendix A to Part 242 - Schedule of Civil Penalties

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Schedule of Civil Penalties A Appendix A to Part... Appendix A to Part 242—Schedule of Civil Penalties A penalty may be assessed against an individual only for...—Schedule of Civil Penalties 1 Section Violation Willful violation Subpart B—Program and Eligibility...

  9. Fluor Hanford (FH) River Corridor Transition Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MCBRIDE, D.J.

    2002-08-28

    This Transition Plan defines the scope and schedule for actions that are critical for a smooth transition of the River Corridor scope of work and to ensure the achievement of transition as planned, with minimal or no impact to ongoing baseline activities.

  10. Enhanced Software for Scheduling Space-Shuttle Processing

    NASA Technical Reports Server (NTRS)

    Barretta, Joseph A.; Johnson, Earl P.; Bierman, Rocky R.; Blanco, Juan; Boaz, Kathleen; Stotz, Lisa A.; Clark, Michael; Lebovitz, George; Lotti, Kenneth J.; Moody, James M.; hide

    2004-01-01

    The Ground Processing Scheduling System (GPSS) computer program is used to develop streamlined schedules for the inspection, repair, and refurbishment of space shuttles at Kennedy Space Center. A scheduling computer program is needed because space-shuttle processing is complex and it is frequently necessary to modify schedules to accommodate unanticipated events, unavailability of specialized personnel, unexpected delays, and the need to repair newly discovered defects. GPSS implements constraint-based scheduling algorithms and provides an interactive scheduling software environment. In response to inputs, GPSS can respond with schedules that are optimized in the sense that they contain minimal violations of constraints while supporting the most effective and efficient utilization of space-shuttle ground processing resources. The present version of GPSS is a product of re-engineering of a prototype version. While the prototype version proved to be valuable and versatile as a scheduling software tool during the first five years, it was characterized by design and algorithmic deficiencies that affected schedule revisions, query capability, task movement, report capability, and overall interface complexity. In addition, the lack of documentation gave rise to difficulties in maintenance and limited both enhanceability and portability. The goal of the GPSS re-engineering project was to upgrade the prototype into a flexible system that supports multiple- flow, multiple-site scheduling and that retains the strengths of the prototype while incorporating improvements in maintainability, enhanceability, and portability.

  11. Simplifying Facility and Event Scheduling: Saving Time and Money.

    ERIC Educational Resources Information Center

    Raasch, Kevin

    2003-01-01

    Describes a product called the Event Management System (EMS), a computer software program to manage facility and event scheduling. Provides example of the school district and university uses of EMS. Describes steps in selecting a scheduling-management system. (PKP)

  12. 40 CFR 52.1524 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Compliance schedules. 52.1524 Section 52.1524 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1524 Compliance schedules...

  13. 40 CFR 52.1524 - Compliance schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 4 2012-07-01 2012-07-01 false Compliance schedules. 52.1524 Section 52.1524 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1524 Compliance schedules...

  14. 40 CFR 52.1524 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Compliance schedules. 52.1524 Section 52.1524 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1524 Compliance schedules...

  15. 40 CFR 52.1524 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Compliance schedules. 52.1524 Section 52.1524 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1524 Compliance schedules...

  16. Training and certification of work schedule managers may improve shift scheduling practices

    DOT National Transportation Integrated Search

    2011-02-01

    The Federal Railroad Administration (FRA) Human Factors Research and Development (R&D) Program : sponsored the implementation of a strategic job analysis to investigate the job of work schedule managers : (WSMs) across a diverse range of industries t...

  17. Baseline tests of the battronic Minivan electric delivery van

    NASA Technical Reports Server (NTRS)

    Dustin, M. O.; Soltis, R. F.; Bozek, J. M.; Maslowski, E. A.

    1977-01-01

    An electric passenger vehicle was tested to develop data characterizing the state of the art of electric and hybrid vehicles. The test measured vehicle maximum speed, range at constant speed, range over stop-and-go driving schedules, maximum acceleration, gradeability and limit, road energy consumption, road power, indicated energy consumption, braking capability and battery charge efficiency. The data obtained are to serve as a baseline to compare improvements in electric and hybrid vehicle technologies and to assist in establishing performance standards.

  18. 76 FR 70366 - Ammonium Nitrate Security Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-14

    ... Ammonium Nitrate Security Program, the DHS will regulate the sale and transfer of ammonium nitrate pursuant... raised in this notice. Date, Time, and Location: An additional public meeting is scheduled to be held at... changes to the current schedule or additional public meeting dates, times, and locations in a subsequent...

  19. Wave scheduling - Decentralized scheduling of task forces in multicomputers

    NASA Technical Reports Server (NTRS)

    Van Tilborg, A. M.; Wittie, L. D.

    1984-01-01

    Decentralized operating systems that control large multicomputers need techniques to schedule competing parallel programs called task forces. Wave scheduling is a probabilistic technique that uses a hierarchical distributed virtual machine to schedule task forces by recursively subdividing and issuing wavefront-like commands to processing elements capable of executing individual tasks. Wave scheduling is highly resistant to processing element failures because it uses many distributed schedulers that dynamically assign scheduling responsibilities among themselves. The scheduling technique is trivially extensible as more processing elements join the host multicomputer. A simple model of scheduling cost is used by every scheduler node to distribute scheduling activity and minimize wasted processing capacity by using perceived workload to vary decentralized scheduling rules. At low to moderate levels of network activity, wave scheduling is only slightly less efficient than a central scheduler in its ability to direct processing elements to accomplish useful work.

  20. The design of a turboshaft speed governor using modern control techniques

    NASA Technical Reports Server (NTRS)

    Delosreyes, G.; Gouchoe, D. R.

    1986-01-01

    The objectives of this program were: to verify the model of off schedule compressor variable geometry in the T700 turboshaft engine nonlinear model; to evaluate the use of the pseudo-random binary noise (PRBN) technique for obtaining engine frequency response data; and to design a high performance power turbine speed governor using modern control methods. Reduction of T700 engine test data generated at NASA-Lewis indicated that the off schedule variable geometry effects were accurate as modeled. Analysis also showed that the PRBN technique combined with the maximum likelihood model identification method produced a Bode frequency response that was as accurate as the response obtained from standard sinewave testing methods. The frequency response verified the accuracy of linear models consisting of engine partial derivatives and used for design. A power turbine governor was designed using the Linear Quadratic Regulator (LQR) method of full state feedback control. A Kalman filter observer was used to estimate helicopter main rotor blade velocity. Compared to the baseline T700 power turbine speed governor, the LQR governor reduced droop up to 25 percent for a 490 shaft horsepower transient in 0.1 sec simulating a wind gust, and up to 85 percent for a 700 shaft horsepower transient in 0.5 sec simulating a large collective pitch angle transient.

  1. In a randomized case-control trial with 10-years olds suffering from attention deficit/hyperactivity disorder (ADHD) sleep and psychological functioning improved during a 12-week sleep-training program.

    PubMed

    Keshavarzi, Zahra; Bajoghli, Hafez; Mohamadi, Mohammad Reza; Salmanian, Maryam; Kirov, Roumen; Gerber, Markus; Holsboer-Trachsler, Edith; Brand, Serge

    2014-12-01

    We tested the hypothesis that sleep training would improve emotional, social and behavioural functioning in children with attention-deficit/hyperactivity disorder (ADHD) compared to children with ADHD without such intervention and to healthy controls. Forty children with ADHD were randomly assigned to intervention and control conditions. Parents of 20 children with ADHD were instructed and thoroughly supervised in improving their children's sleep schedules and sleep behaviour. Parents of the other 20 children with ADHD and parents of 20 healthy children received general information about sleep hygiene. At baseline and 12 weeks later, parents and children completed questionnaires related to children's sleep and psychological functioning. Relative to the control groups, children in the intervention group improved sleep quantitatively and qualitatively (F values < 3.33, P values < 0.05). The intervention group children reported improvements in mood, emotions, and relationships (F values < 2.99, P values < 0.05). Parents reported that their children improved in physical and psychological wellbeing, mood, emotions, relationships, and social acceptance (F values < 3.02, P values < 0.05). Training and monitoring parents of children with ADHD in regulating and supervising children's sleep schedules leads to positive changes in the emotions, behaviour and social lives of these children.

  2. Experience with dynamic reinforcement rates decreases resistance to extinction.

    PubMed

    Craig, Andrew R; Shahan, Timothy A

    2016-03-01

    The ability of organisms to detect reinforcer-rate changes in choice preparations is positively related to two factors: the magnitude of the change in rate and the frequency with which rates change. Gallistel (2012) suggested similar rate-detection processes are responsible for decreases in responding during operant extinction. Although effects of magnitude of change in reinforcer rate on resistance to extinction are well known (e.g., the partial-reinforcement-extinction effect), effects of frequency of changes in rate prior to extinction are unknown. Thus, the present experiments examined whether frequency of changes in baseline reinforcer rates impacts resistance to extinction. Pigeons pecked keys for variable-interval food under conditions where reinforcer rates were stable and where they changed within and between sessions. Overall reinforcer rates between conditions were controlled. In Experiment 1, resistance to extinction was lower following exposure to dynamic reinforcement schedules than to static schedules. Experiment 2 showed that resistance to presession feeding, a disruptor that should not involve change-detection processes, was unaffected by baseline-schedule dynamics. These findings are consistent with the suggestion that change detection contributes to extinction. We discuss implications of change-detection processes for extinction of simple and discriminated operant behavior and relate these processes to the behavioral-momentum based approach to understanding extinction. © 2016 Society for the Experimental Analysis of Behavior.

  3. Space Launch System Development Status

    NASA Technical Reports Server (NTRS)

    Lyles, Garry

    2014-01-01

    Development of NASA's Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than three years after formal program approval. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of Core Stage test panels; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for testing the RS-25 Core Stage engine; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. Objectives of this Earth-orbit flight include validating the performance of Orion's heat shield and the MSA design, which will be manufactured again for SLS missions to deep space. The Program successfully completed Preliminary Design Review in 2013 and Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

  4. NASA's Space Launch System Development Status

    NASA Technical Reports Server (NTRS)

    Lyles, Garry

    2014-01-01

    Development of the National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than 3 years after formal program establishment. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of core stage test barrels and domes; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for RS- 25 core stage engine testing; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. The Program successfully completed Preliminary Design Review in 2013 and will complete Key Decision Point C in 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS Program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

  5. 10 CFR 490.302 - Vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule. (a...

  6. 10 CFR 490.302 - Vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule. (a...

  7. 10 CFR 490.302 - Vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule. (a...

  8. 10 CFR 490.302 - Vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule. (a...

  9. 10 CFR 490.302 - Vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule. (a...

  10. 28 CFR 548.13 - Schedules and facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Schedules and facilities. 548.13 Section 548.13 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT RELIGIOUS PROGRAMS Religious Beliefs and Practices of Committed Offenders § 548.13 Schedules and facilities...

  11. 28 CFR 548.13 - Schedules and facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Schedules and facilities. 548.13 Section 548.13 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT RELIGIOUS PROGRAMS Religious Beliefs and Practices of Committed Offenders § 548.13 Schedules and facilities...

  12. 28 CFR 548.13 - Schedules and facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Schedules and facilities. 548.13 Section 548.13 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT RELIGIOUS PROGRAMS Religious Beliefs and Practices of Committed Offenders § 548.13 Schedules and facilities...

  13. 28 CFR 548.13 - Schedules and facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Schedules and facilities. 548.13 Section 548.13 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT RELIGIOUS PROGRAMS Religious Beliefs and Practices of Committed Offenders § 548.13 Schedules and facilities...

  14. 28 CFR 548.13 - Schedules and facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Schedules and facilities. 548.13 Section 548.13 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT RELIGIOUS PROGRAMS Religious Beliefs and Practices of Committed Offenders § 548.13 Schedules and facilities...

  15. 40 CFR 52.626 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Compliance schedules. 52.626 Section 52.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) [Reserved] (b...

  16. 40 CFR 63.1102 - Compliance schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Compliance schedule. 63.1102 Section 63.1102 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Technology Standards § 63.1102 Compliance schedule. (a) General requirements. Affected sources, as defined in...

  17. Schedulers with load-store queue awareness

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, Tong; Eichenberger, Alexandre E.; Jacob, Arpith C.

    2017-02-07

    In one embodiment, a computer-implemented method includes tracking a size of a load-store queue (LSQ) during compile time of a program. The size of the LSQ is time-varying and indicates how many memory access instructions of the program are on the LSQ. The method further includes scheduling, by a computer processor, a plurality of memory access instructions of the program based on the size of the LSQ.

  18. Schedulers with load-store queue awareness

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, Tong; Eichenberger, Alexandre E.; Jacob, Arpith C.

    2017-01-24

    In one embodiment, a computer-implemented method includes tracking a size of a load-store queue (LSQ) during compile time of a program. The size of the LSQ is time-varying and indicates how many memory access instructions of the program are on the LSQ. The method further includes scheduling, by a computer processor, a plurality of memory access instructions of the program based on the size of the LSQ.

  19. A Study of the Utilization of Advanced Composites in Fuselage Structures of Commercial Aircraft

    NASA Technical Reports Server (NTRS)

    Watts, D. J.; Sumida, P. T.; Bunin, B. L.; Janicki, G. S.; Walker, J. V.; Fox, B. R.

    1985-01-01

    A study was conducted to define the technology and data needed to support the introduction of advanced composites in the future production of fuselage structure in large transport aircraft. Fuselage structures of six candidate airplanes were evaluated for the baseline component. The MD-100 was selected on the basis of its representation of 1990s fuselage structure, an available data base, its impact on the schedule and cost of the development program, and its availability and suitability for flight service evaluation. Acceptance criteria were defined, technology issues were identified, and a composite fuselage technology development plan, including full-scale tests, was identified. The plan was based on composite materials to be available in the mid to late 1980s. Program resources required to develop composite fuselage technology are estimated at a rough order of magnitude to be 877 man-years exclusive of the bird strike and impact dynamic test components. A conceptual composite fuselage was designed, retaining the basic MD-100 structural arrangement for doors, windows, wing, wheel wells, cockpit enclosure, major bulkheads, etc., resulting in a 32 percent weight savings.

  20. Improving Hospital-Wide Early Resource Allocation through Machine Learning.

    PubMed

    Gartner, Daniel; Padman, Rema

    2015-01-01

    The objective of this paper is to evaluate the extent to which early determination of diagnosis-related groups (DRGs) can be used for better allocation of scarce hospital resources. When elective patients seek admission, the true DRG, currently determined only at discharge, is unknown. We approach the problem of early DRG determination in three stages: (1) test how much a Naïve Bayes classifier can improve classification accuracy as compared to a hospital's current approach; (2) develop a statistical program that makes admission and scheduling decisions based on the patients' clincial pathways and scarce hospital resources; and (3) feed the DRG as classified by the Naïve Bayes classifier and the hospitals' baseline approach into the model (which we evaluate in simulation). Our results reveal that the DRG grouper performs poorly in classifying the DRG correctly before admission while the Naïve Bayes approach substantially improves the classification task. The results from the connection of the classification method with the mathematical program also reveal that resource allocation decisions can be more effective and efficient with the hybrid approach.

  1. Ensemble machine learning and forecasting can achieve 99% uptime for rural handpumps

    PubMed Central

    Thomas, Evan A.

    2017-01-01

    Broken water pumps continue to impede efforts to deliver clean and economically-viable water to the global poor. The literature has demonstrated that customers’ health benefits and willingness to pay for clean water are best realized when clean water infrastructure performs extremely well (>99% uptime). In this paper, we used sensor data from 42 Afridev-brand handpumps observed for 14 months in western Kenya to demonstrate how sensors and supervised ensemble machine learning could be used to increase total fleet uptime from a best-practices baseline of about 70% to >99%. We accomplish this increase in uptime by forecasting pump failures and identifying existing failures very quickly. Comparing the costs of operating the pump per functional year over a lifetime of 10 years, we estimate that implementing this algorithm would save 7% on the levelized cost of water relative to a sensor-less scheduled maintenance program. Combined with a rigorous system for dispatching maintenance personnel, implementing this algorithm in a real-world program could significantly improve health outcomes and customers’ willingness to pay for water services. PMID:29182673

  2. Space Station Cathode Design, Performance, and Operating Specifications

    NASA Technical Reports Server (NTRS)

    Patterson, Michael J.; Verhey, Timothy R.; Soulas, George; Zakany, James

    1998-01-01

    A plasma contactor system was baselined for the International Space Station (ISS) to eliminate/mitigate damaging interactions with the space environment. The system represents a dual-use technology which is a direct outgrowth of the NASA electric propulsion program and, in particular, the technology development efforts on ion thruster systems. The plasma contactor includes a hollow cathode assembly (HCA), a power electronics unit, and a xenon gas feed system. Under a pre-flight development program, these subsystems were taken to the level of maturity appropriate for transfer to U.S. industry for final development. NASA's Lewis Research Center was subsequently requested by ISS to manufacture and deliver the engineering model, qualification model, and flight HCA units. To date, multiple units have been built. One cathode has demonstrated approximately 28,000 hours lifetime, two development unit HCAs have demonstrated over 10,000 hours lifetime, and one development unit HCA has demonstrated more than 32,000 ignitions. All 8 flight HCAs have been manufactured, acceptance tested, and are ready for delivery to the flight contractor. This paper discusses the requirements, mechanical design, performance, operating specifications, and schedule for the plasma contactor flight HCAs.

  3. Interaction Between Strategic and Local Traffic Flow Controls

    NASA Technical Reports Server (NTRS)

    Grabbe, Son; Sridhar, Banavar; Mukherjee, Avijit; Morando, Alexander

    2010-01-01

    The loosely coordinated sets of traffic flow management initiatives that are operationally implemented at the national- and local-levels have the potential to under, over, and inconsistently control flights. This study is designed to explore these interactions through fast-time simulations with an emphasis on identifying inequitable situations in which flights receive multiple uncoordinated delays. Two operationally derived scenarios were considered in which flights arriving into the Dallas/Fort Worth International Airport were first controlled at the national-level, either with a Ground Delay Program or a playbook reroute. These flights were subsequently controlled at the local level. The Traffic Management Advisor assigned them arrival scheduling delays. For the Ground Delay Program scenarios, between 51% and 53% of all arrivals experience both pre-departure delays from the Ground Delay Program and arrival scheduling delays from the Traffic Management Advisor. Of the subset of flights that received multiple delays, between 5.7% and 6.4% of the internal departures were first assigned a pre-departure delay by the Ground Delay Program, followed by a second pre-departure delay as a result of the arrival scheduling. For the playbook reroute scenario, Dallas/Fort Worth International Airport arrivals were first assigned pre-departure reroutes based on the MW_2_DALLAS playbook plan, and were subsequently assigned arrival scheduling delays by the Traffic Management Advisor. Since the airport was operating well below capacity when the playbook reroute was in effect, only 7% of the arrivals were observed to receive both rerouting and arrival scheduling delays. Findings from these initial experiments confirm field observations that Ground Delay Programs operated in conjunction with arrival scheduling can result in inequitable situations in which flights receive multiple uncoordinated delays.

  4. Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.

  5. Scheduling elective surgeries: the tradeoff among bed capacity, waiting patients and operating room utilization using goal programming.

    PubMed

    Li, Xiangyong; Rafaliya, N; Baki, M Fazle; Chaouch, Ben A

    2017-03-01

    Scheduling of surgeries in the operating rooms under limited competing resources such as surgical and nursing staff, anesthesiologist, medical equipment, and recovery beds in surgical wards is a complicated process. A well-designed schedule should be concerned with the welfare of the entire system by allocating the available resources in an efficient and effective manner. In this paper, we develop an integer linear programming model in a manner useful for multiple goals for optimally scheduling elective surgeries based on the availability of surgeons and operating rooms over a time horizon. In particular, the model is concerned with the minimization of the following important goals: (1) the anticipated number of patients waiting for service; (2) the underutilization of operating room time; (3) the maximum expected number of patients in the recovery unit; and (4) the expected range (the difference between maximum and minimum expected number) of patients in the recovery unit. We develop two goal programming (GP) models: lexicographic GP model and weighted GP model. The lexicographic GP model schedules operating rooms when various preemptive priority levels are given to these four goals. A numerical study is conducted to illustrate the optimal master-surgery schedule obtained from the models. The numerical results demonstrate that when the available number of surgeons and operating rooms is known without error over the planning horizon, the proposed models can produce good schedules and priority levels and preference weights of four goals affect the resulting schedules. The results quantify the tradeoffs that must take place as the preemptive-weights of the four goals are changed.

  6. Scheduling Algorithm for Mission Planning and Logistics Evaluation (SAMPLE). Volume 2: Mission payloads subsystem description

    NASA Technical Reports Server (NTRS)

    Dupnick, E.; Wiggins, D.

    1980-01-01

    The scheduling algorithm for mission planning and logistics evaluation (SAMPLE) is presented. Two major subsystems are included: The mission payloads program; and the set covering program. Formats and parameter definitions for the payload data set (payload model), feasible combination file, and traffic model are documented.

  7. A Model Schedule for a Capital Improvement Program.

    ERIC Educational Resources Information Center

    Oates, Arnold D.; Burch, A. Lee

    The Model Schedule for a Capital Improvement Program described in this paper encourages school leaders to consider a more holistic view of the planning process. It is intended to assist those responsible for educational facility planning, who must assure that all important and relevant tasks are accomplished in a timely manner. The model's six…

  8. Government Style as a Factor in Information Flow: Television Programming in Argentina, l979-l988.

    ERIC Educational Resources Information Center

    John, Jeffrey Alan

    Noting that Argentina's recent history is particularly useful for analysis of the varying effects that differing government styles can have on a single mass communication system, a study compared Argentine (specifically Buenos Aires) television's 1979 programming schedule, prepared during a military dictatorship, with recent schedules prepared…

  9. 78 FR 74229 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, Clinical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-10

    ...This major final rule with comment period addresses changes to the physician fee schedule, clinical laboratory fee schedule, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. This final rule with comment period also includes a discussion in the Supplementary Information regarding various programs. (See the Table of Contents for a listing of the specific issues addressed in the final rule with comment period.)

  10. Health and Occupational Outcomes Among Injured, Nonstandard Shift Workers.

    PubMed

    Wong, Imelda S; Smith, Peter M; Mustard, Cameron A; Gignac, Monique A M

    2015-11-01

    This study compares health and occupational outcomes following a work-related injury for nonstandard and day-shift workers. National Population Health Survey data were used to explore outcomes 2 years post-work injury. Retrospective-matched cohort analyses examined main effects and interactions of shift schedule and work injury with changes in health, shift schedule, and labor force status. Models were adjusted for respondent characteristics, baseline health status, and occupational strength requirements. Injured nonstandard shift workers reported lower health utility index scores, compared with uninjured and injured daytime workers and uninjured nonstandard-shift workers. No significant interactions between shift and injury were found with schedule change and leaving the labor force. Injured nonstandard-shift workers are as likely to remain employed as other groups, but may be vulnerable in terms of diminished health.

  11. A treatment comparison study of a photo activity schedule and Social Stories for teaching social skills to children with Autism Spectrum Disorder: brief report.

    PubMed

    Daneshvar, Sabrina D; Charlop, Marjorie H; Berry Malmberg, Debra

    2018-05-21

    To compare the efficacy of two procedures, a photo activity schedule intervention and Social Stories, to teach social skills to four children diagnosed with Autism Spectrum Disorder (ASD). An adapted alternating treatments design with an additional multiple baseline control was used, and two social skills were targeted for each of the four participants, one under each intervention condition. Results indicated that all four participants learned the target social behaviours with the photo activity schedule intervention, but did not learn target social behaviours with Social Stories. Findings support the use of a photo activity intervention for teaching social skillsto children with ASD; we discuss the implications of inconsistent findings of effectiveness of Social Stories.

  12. Design and evaluation of a theory-based, culturally relevant outreach model for breast and cervical cancer screening for Latina immigrants.

    PubMed

    White, Kari; Garces, Isabel C; Bandura, Lisa; McGuire, Allison A; Scarinci, Isabel C

    2012-01-01

    Breast and cervical cancer are common among Latinas, but screening rates among foreign-born Latinas are relatively low. In this article we describe the design and implementation of a theory-based (PEN-3) outreach program to promote breast and cervical cancer screening to Latina immigrants, and evaluate the program's effectiveness. We used data from self-administered questionnaires completed at six annual outreach events to examine the sociodemographic characteristics of attendees and evaluate whether the program reached the priority population - foreign-born Latina immigrants with limited access to health care and screening services. To evaluate the program's effectiveness in connecting women to screening, we examined the proportion and characteristics of women who scheduled and attended Pap smear and mammography appointments. Among the 782 Latinas who attended the outreach program, 60% and 83% had not had a Pap smear or mammogram, respectively, in at least a year. Overall, 80% scheduled a Pap smear and 78% scheduled a mammogram. Women without insurance, who did not know where to get screening and had not been screened in the last year were more likely to schedule appointments (P < .05). Among women who scheduled appointments, 65% attended their Pap smear and 79% attended the mammogram. We did not identify significant differences in sociodemographic characteristics associated with appointment attendance. Using a theoretical approach to outreach design and implementation, it is possible to reach a substantial number of Latina immigrants and connect them to cancer screening services.

  13. Participant characteristics associated with greater reductions in waist circumference during a four-month, pedometer-based, workplace health program.

    PubMed

    Freak-Poli, Rosanne L A; Wolfe, Rory; Walls, Helen; Backholer, Kathryn; Peeters, Anna

    2011-10-25

    Workplace health programs have demonstrated improvements in a number of risk factors for chronic disease. However, there has been little investigation of participant characteristics that may be associated with change in risk factors during such programs. The aim of this paper is to identify participant characteristics associated with improved waist circumference (WC) following participation in a four-month, pedometer-based, physical activity, workplace health program. 762 adults employed in primarily sedentary occupations and voluntarily enrolled in a four-month workplace program aimed at increasing physical activity were recruited from ten Australian worksites in 2008. Seventy-nine percent returned at the end of the health program. Data included demographic, behavioural, anthropometric and biomedical measurements. WC change (before versus after) was assessed by multivariable linear and logistic regression analyses. Seven groupings of potential associated variables from baseline were sequentially added to build progressively larger regression models. Greater improvement in WC during the program was associated with having completed tertiary education, consuming two or less standard alcoholic beverages in one occasion in the twelve months prior to baseline, undertaking less baseline weekend sitting time and lower baseline total cholesterol. A greater WC at baseline was strongly associated with a greater improvement in WC. A sub-analysis in participants with a 'high-risk' baseline WC revealed that younger age, enrolling for reasons other than appearance, undertaking less weekend sitting time at baseline, eating two or more pieces of fruit per day at baseline, higher baseline physical functioning and lower baseline body mass index were associated with greater odds of moving to 'low risk' WC at the end of the program. While employees with 'high-risk' WC at baseline experienced the greatest improvements in WC, the other variables associated with greater WC improvement were generally indicators of better baseline health. These results indicate that employees who started with better health, potentially due to lifestyle or recent behavioural changes, were more likely to respond positively to the program. Future health program initiators should think innovatively to encourage all enrolees along the health spectrum to achieve a successful outcome.

  14. 5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...

  15. 5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...

  16. 5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...

  17. 5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...

  18. 5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...

  19. 20 CFR 614.12 - Schedules of remuneration.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Schedules of remuneration. 614.12 Section 614.12 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR UNEMPLOYMENT... Forces, with a statement of the effective date of the schedule. Benefit amounts for the UCX Program are...

  20. Measuring and Reducing College Students' Procrastination

    ERIC Educational Resources Information Center

    Perrin, Christopher J.; Miller, Neal; Haberlin, Alayna T.; Ivy, Jonathan W.; Meindl, James N.; Neef, Nancy A.

    2011-01-01

    We examined college students' procrastination when studying for weekly in-class quizzes. Two schedules of online practice quiz delivery were compared using a multiple baseline design. When online study material was made available noncontingently, students usually procrastinated. When access to additional study material was contingent on completing…

  1. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... related performance budgets, resources, and schedules. It should provide a mutual understanding of the inherent risks in offerors'/contractors' performance plans and the underlying management control systems... objectives of the scope of work; (2) Adequacy of the time allocated for performing the defined tasks to...

  2. Software Cost-Estimation Model

    NASA Technical Reports Server (NTRS)

    Tausworthe, R. C.

    1985-01-01

    Software Cost Estimation Model SOFTCOST provides automated resource and schedule model for software development. Combines several cost models found in open literature into one comprehensive set of algorithms. Compensates for nearly fifty implementation factors relative to size of task, inherited baseline, organizational and system environment and difficulty of task.

  3. Relieving the Time Squeeze? Effects of a White-Collar Workplace Change on Parents

    PubMed Central

    Hill, Rachelle; Tranby, Eric; Kelly, Erin; Moen, Phyllis

    2013-01-01

    Employed parents perceive a time squeeze even as trends from the 1960s show they are spending more time with their children. Work conditions (e.g., hours and schedule control) would seem to affect both parents’ time with children and perceived time squeeze, but most studies rely on cross-sectional data that do not establish causality. The authors examined the effects of the introduction of a workplace flexibility initiative (Results Only Work Environment [ROWE]) on changes in mothers’ and fathers’ perceptions of the adequacy of their time with children and actual time spent with children (N = 225). Baseline data show the importance of work conditions for parents’ sense of perceived time adequacy. Panel data show that mothers (but not fathers) in ROWE report increased schedule control and improved time adequacy, but no change in actual time spent with children, except that ROWE increases evening meals with children for mothers sharing few meals at baseline. PMID:24436498

  4. Applying Resource Based Relative Value Scales (RBRVS) to the Champus Program

    DTIC Science & Technology

    1990-12-01

    fee for the related service .[Ref. 6:p. 7] F. EFFECTS OF RBRVS When a Medicare fee schedule is fully implemented, several Important...reimbursement rates increase would be attracted to CHAMPUS. In analyzing the impact of a resource based fee schedule on the Medicare program, the PPRC...procedures performed by physicians into components of work, training costs, and practice costs. The Medicare program is planning to implement a fee

  5. Programmed environment management of confined microsocieties

    NASA Technical Reports Server (NTRS)

    Emurian, Henry H.

    1988-01-01

    A programmed environment is described that assists the implementation and management of schedules governing access to all resources and information potentially available to members of a confined microsociety. Living and work schedules are presented that were designed to build individual and group performance repertoires in support of study objectives and sustained adaptation by participants. A variety of measurement requirements can be programmed and standardized to assure continuous assessment of the status and health of a confined microsociety.

  6. 40 CFR 80.295 - How is a refinery sulfur baseline determined?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false How is a refinery sulfur baseline... PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Gasoline Sulfur Abt Program-Baseline Determination § 80.295 How is a refinery sulfur baseline determined? (a) A refinery's gasoline sulfur baseline...

  7. 40 CFR 80.295 - How is a refinery sulfur baseline determined?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 16 2011-07-01 2011-07-01 false How is a refinery sulfur baseline... PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Gasoline Sulfur Abt Program-Baseline Determination § 80.295 How is a refinery sulfur baseline determined? (a) A refinery's gasoline sulfur baseline...

  8. 40 CFR 80.295 - How is a refinery sulfur baseline determined?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false How is a refinery sulfur baseline... PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Gasoline Sulfur Abt Program-Baseline Determination § 80.295 How is a refinery sulfur baseline determined? (a) A refinery's gasoline sulfur baseline...

  9. 40 CFR 80.295 - How is a refinery sulfur baseline determined?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 17 2012-07-01 2012-07-01 false How is a refinery sulfur baseline... PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Gasoline Sulfur Abt Program-Baseline Determination § 80.295 How is a refinery sulfur baseline determined? (a) A refinery's gasoline sulfur baseline...

  10. 40 CFR 80.295 - How is a refinery sulfur baseline determined?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 17 2014-07-01 2014-07-01 false How is a refinery sulfur baseline... PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Gasoline Sulfur Abt Program-Baseline Determination § 80.295 How is a refinery sulfur baseline determined? (a) A refinery's gasoline sulfur baseline...

  11. Automated medical resident rotation and shift scheduling to ensure quality resident education and patient care.

    PubMed

    Smalley, Hannah K; Keskinocak, Pinar

    2016-03-01

    At academic teaching hospitals around the country, the majority of clinical care is provided by resident physicians. During their training, medical residents often rotate through various hospitals and/or medical services to maximize their education. Depending on the size of the training program, manually constructing such a rotation schedule can be cumbersome and time consuming. Further, rules governing allowable duty hours for residents have grown more restrictive in recent years (ACGME 2011), making day-to-day shift scheduling of residents more difficult (Connors et al., J Thorac Cardiovasc Surg 137:710-713, 2009; McCoy et al., May Clin Proc 86(3):192, 2011; Willis et al., J Surg Edu 66(4):216-221, 2009). These rules limit lengths of duty periods, allowable duty hours in a week, and rest periods, to name a few. In this paper, we present two integer programming models (IPs) with the goals of (1) creating feasible assignments of residents to rotations over a one-year period, and (2) constructing night and weekend call-shift schedules for the individual rotations. These models capture various duty-hour rules and constraints, provide the ability to test multiple what-if scenarios, and largely automate the process of schedule generation, solving these scheduling problems more effectively and efficiently compared to manual methods. Applying our models on data from a surgical residency program, we highlight the infeasibilities created by increased duty-hour restrictions placed on residents in conjunction with current scheduling paradigms.

  12. QoS Differential Scheduling in Cognitive-Radio-Based Smart Grid Networks: An Adaptive Dynamic Programming Approach.

    PubMed

    Yu, Rong; Zhong, Weifeng; Xie, Shengli; Zhang, Yan; Zhang, Yun

    2016-02-01

    As the next-generation power grid, smart grid will be integrated with a variety of novel communication technologies to support the explosive data traffic and the diverse requirements of quality of service (QoS). Cognitive radio (CR), which has the favorable ability to improve the spectrum utilization, provides an efficient and reliable solution for smart grid communications networks. In this paper, we study the QoS differential scheduling problem in the CR-based smart grid communications networks. The scheduler is responsible for managing the spectrum resources and arranging the data transmissions of smart grid users (SGUs). To guarantee the differential QoS, the SGUs are assigned to have different priorities according to their roles and their current situations in the smart grid. Based on the QoS-aware priority policy, the scheduler adjusts the channels allocation to minimize the transmission delay of SGUs. The entire transmission scheduling problem is formulated as a semi-Markov decision process and solved by the methodology of adaptive dynamic programming. A heuristic dynamic programming (HDP) architecture is established for the scheduling problem. By the online network training, the HDP can learn from the activities of primary users and SGUs, and adjust the scheduling decision to achieve the purpose of transmission delay minimization. Simulation results illustrate that the proposed priority policy ensures the low transmission delay of high priority SGUs. In addition, the emergency data transmission delay is also reduced to a significantly low level, guaranteeing the differential QoS in smart grid.

  13. 42 CFR 414.620 - Publication of the ambulance fee schedule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 414.620 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE PROGRAM PAYMENT FOR PART B MEDICAL AND OTHER HEALTH SERVICES Fee Schedule for Ambulance Services § 414.620 Publication of the ambulance fee schedule. Changes in payment rates resulting...

  14. 40 CFR 52.240 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Compliance schedules. 52.240 Section 52.240 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.240 Compliance schedules. (a) The requirements of § 51.262(a) of this chapter are...

  15. 40 CFR 52.240 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Compliance schedules. 52.240 Section 52.240 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.240 Compliance schedules. (a) The requirements of § 51.262(a) of this chapter are...

  16. 40 CFR 52.240 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Compliance schedules. 52.240 Section 52.240 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.240 Compliance schedules. (a) The requirements of § 51.262(a) of this chapter are...

  17. 40 CFR 52.240 - Compliance schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Compliance schedules. 52.240 Section 52.240 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.240 Compliance schedules. (a) The requirements of § 51.262(a) of this chapter are...

  18. 40 CFR 52.240 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Compliance schedules. 52.240 Section 52.240 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.240 Compliance schedules. (a) The requirements of § 51.262(a) of this chapter are...

  19. 40 CFR 78.13 - Scheduling orders and pre-hearing conferences.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Scheduling orders and pre-hearing conferences. 78.13 Section 78.13 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPEAL PROCEDURES § 78.13 Scheduling orders and pre-hearing conferences. (a) If a...

  20. 20 CFR 656.5 - Schedule A.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Schedule A may apply for that labor certification under § 656.15. Schedule A (a) Group I: (1) Persons who... National Council of State Boards of Nursing. (3) Definitions of Group I occupations: (i) Physical therapist... illness in others. A program of study for professional nurses generally includes theory and practice in...

  1. 49 CFR 22.25 - Lender deliverables and delivery schedule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Lender deliverables and delivery schedule. 22.25 Section 22.25 Transportation Office of the Secretary of Transportation SHORT-TERM LENDING PROGRAM (STLP) Participating Lenders § 22.25 Lender deliverables and delivery schedule. All Participating Lenders must adhere...

  2. 20 CFR 638.505 - Scheduling of training.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Scheduling of training. 638.505 Section 638.505 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR JOB CORPS PROGRAM UNDER TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Center Operations § 638.505 Scheduling of training...

  3. Naval Postgraduate School Solar Cell Array Tester

    DTIC Science & Technology

    2010-12-01

    PROGRAM MANAGEMENT ................................45 1. SCHEDULE .....................................47 B. BUDGET...budget and schedule from December 2009 to September 2010. In addition, a total development cost estimate, including labor, equipment, and testing... scheduler becomes active, all tasks become eligible to run, and normal operations begin. Figure 21 shows a diagram of the startup actions [32

  4. Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B for CY 2018; Medicare Shared Savings Program Requirements; and Medicare Diabetes Prevention Program. Final rule.

    PubMed

    2017-11-15

    This major final rule addresses changes to the Medicare physician fee schedule (PFS) and other Medicare Part B payment policies such as changes to the Medicare Shared Savings Program, to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services, as well as changes in the statute. In addition, this final rule includes policies necessary to begin offering the expanded Medicare Diabetes Prevention Program model.

  5. Psychiatric Inpatient Discharge Planning Practices and Attendance at Aftercare Appointments.

    PubMed

    Smith, Thomas E; Abraham, Maria; Bolotnikova, Natalia V; Donahue, Sheila A; Essock, Susan M; Olfson, Mark; Shao, Wenjun S; Wall, Melanie M; Radigan, Marleen

    2017-01-01

    This study examined discharge planning practices by hospital providers for 17,053 psychiatric discharges in New York's statewide Medicaid program. Claims data were linked to information reported to New York State by managed behavioral health care organizations (MBHOs) conducting inpatient utilization reviews. MBHOs documented hospital providers' reports of the presence of three discharge planning practices for each discharge: communicating with an outpatient provider prior to discharge, scheduling an aftercare appointment, and forwarding a discharge summary. Hospital providers reported completing at least one of the three discharge planning practices for 85% of discharges. Individuals who received all three discharge planning practices had a higher likelihood of follow-up and kept their first outpatient follow-up visit at almost twice the speed compared with individuals who received none of the practices (hazard ratio=1.96, p<.001). This study provided baseline information concerning routine discharge planning practices and their relationship to timeliness of care transitions.

  6. Automation of the space station core module power management and distribution system

    NASA Technical Reports Server (NTRS)

    Weeks, David J.

    1988-01-01

    Under the Advanced Development Program for Space Station, Marshall Space Flight Center has been developing advanced automation applications for the Power Management and Distribution (PMAD) system inside the Space Station modules for the past three years. The Space Station Module Power Management and Distribution System (SSM/PMAD) test bed features three artificial intelligence (AI) systems coupled with conventional automation software functioning in an autonomous or closed-loop fashion. The AI systems in the test bed include a baseline scheduler/dynamic rescheduler (LES), a load shedding management system (LPLMS), and a fault recovery and management expert system (FRAMES). This test bed will be part of the NASA Systems Autonomy Demonstration for 1990 featuring cooperating expert systems in various Space Station subsystem test beds. It is concluded that advanced automation technology involving AI approaches is sufficiently mature to begin applying the technology to current and planned spacecraft applications including the Space Station.

  7. NASA/NSF Antarctic Science Working Group

    NASA Technical Reports Server (NTRS)

    Stoklosa, Janis H.

    1990-01-01

    A collection of viewgraphs on NASA's Life Sciences Biomedical Programs is presented. They show the structure of the Life Sciences Division; the tentative space exploration schedule from the present to 2018; the biomedical programs with their objectives, research elements, and methodological approaches; validation models; proposed Antarctic research as an analog for space exploration; and the Science Working Group's schedule of events.

  8. U. S. fusion programs: Struggling to stay in the game

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, M.

    Funding for the US fusion energy program has suffered and will probably continue to suffer major cuts. A committee hand-picked by Energy Secretary James Watkins urged the Department of Energy to mount an aggressive program to develop fusion power, but congress cut funding from $323 million in 1990 to $275 million in 1991. This portends dire conditions for fusion research and development. Projects to receive top priority are concerned with the tokamaks and to keep the next big machine, the Burning Plasma Experiment, scheduled for beginning of construction in 1993 on schedule. Secretary Watkins is said to want to keepmore » the International Thermonuclear Energy Reactor (ITER) on schedule. ITER would follow the Burning Plasma Experiment.« less

  9. Human papillomavirus vaccination coverage using two-dose or three-dose schedule criteria.

    PubMed

    Lin, Xia; Rodgers, Loren; Zhu, Liping; Stokley, Shannon; Meites, Elissa; Markowitz, Lauri E

    2017-10-13

    In October 2016, the Advisory Committee on Immunization Practices (ACIP) updated the human papillomavirus (HPV) vaccination recommendation to include a 2-dose schedule for U.S. adolescents initiating the vaccine series before their 15th birthday. We analyzed records for >4million persons aged 9-17years receiving any HPV vaccine by the end of each quarter during January 1, 2014-September 30, 2016 from six Immunization Information Systems Sentinel Sites, and reclassified HPV vaccination up-to-date coverage according to the updated recommendations. Compared with HPV vaccination up-to-date coverage by the 3-dose schedule only, including criteria for either a 2-dose or 3-dose schedule increased up-to-date coverage in 11-12, 13-14, and 15-17 year-olds by 4.5-8.5 percentage points. The difference between 3-dose up-to-date coverage and 2- or 3-dose up-to-date coverage was greatest in late 2016. These data provide baseline HPV vaccination coverage using current ACIP recommendations. Published by Elsevier Ltd.

  10. Economic Metrics for Commercial Reusable Space Transportation Systems

    NASA Technical Reports Server (NTRS)

    Shaw, Eric J.; Hamaker, Joseph (Technical Monitor)

    2000-01-01

    The success of any effort depends upon the effective initial definition of its purpose, in terms of the needs to be satisfied and the goals to be fulfilled. If the desired product is "A System" that is well-characterized, these high-level need and goal statements can be transformed into system requirements by traditional systems engineering techniques. The satisfaction of well-designed requirements can be tracked by fairly straightforward cost, schedule, and technical performance metrics. Unfortunately, some types of efforts, including those that NASA terms "Programs," tend to resist application of traditional systems engineering practices. In the NASA hierarchy of efforts, a "Program" is often an ongoing effort with broad, high-level goals and objectives. A NASA "project" is a finite effort, in terms of budget and schedule, that usually produces or involves one System. Programs usually contain more than one project and thus more than one System. Special care must be taken in the formulation of NASA Programs and their projects, to ensure that lower-level project requirements are traceable to top-level Program goals, feasible with the given cost and schedule constraints, and measurable against top-level goals. NASA Programs and projects are tasked to identify the advancement of technology as an explicit goal, which introduces more complicating factors. The justification for funding of technology development may be based on the technology's applicability to more than one System, Systems outside that Program or even external to NASA. Application of systems engineering to broad-based technology development, leading to effective measurement of the benefits, can be valid, but it requires that potential beneficiary Systems be organized into a hierarchical structure, creating a "system of Systems." In addition, these Systems evolve with the successful application of the technology, which creates the necessity for evolution of the benefit metrics to reflect the changing baseline. Still, economic metrics for technology development in these Programs and projects remain fairly straightforward, being based on reductions in acquisition and operating costs of the Systems. One of the most challenging requirements that NASA levies on its Programs is to plan for the commercialization of the developed technology. Some NASA Programs are created for the express purpose of developing technology for a particular industrial sector, such as aviation or space transportation, in financial partnership with that sector. With industrial investment, another set of goals, constraints and expectations are levied on the technology program. Economic benefit metrics then expand beyond cost and cost savings to include the marketability, profit, and investment return requirements of the private sector. Commercial investment criteria include low risk, potential for high return, and strategic alignment with existing product lines. These corporate criteria derive from top-level strategic plans and investment goals, which rank high among the most proprietary types of information in any business. As a result, top-level economic goals and objectives that industry partners bring to cooperative programs cannot usually be brought into technical processes, such as systems engineering, that are worked collaboratively between Industry and Government. In spite of these handicaps, the top-level economic goals and objectives of a joint technology program can be crafted in such a way that they accurately reflect the fiscal benefits from both Industry and Government perspectives. Valid economic metrics can then be designed that can track progress toward these goals and objectives, while maintaining the confidentiality necessary for the competitive process.

  11. STS-58 crewmembers participate in baseline data collection

    NASA Image and Video Library

    1993-09-29

    S93-45367 (29 Sept 1993) --- Astronaut Rhea Seddon, STS-58 payload commander, participates in biomedical data collection. The seven member crew spent an entire day recording important pre-flight data in preparation for the two week Spacelab Life Sciences (SLS-2) mission, scheduled for next month.

  12. Medicare program; payment policies under the physician fee schedule, five-year review of work relative value units, clinical laboratory fee schedule: signature on requisition, and other revisions to part B for CY 2012. Final rule with comment period.

    PubMed

    2011-11-28

    This final rule with comment period addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It also addresses, implements or discusses certain statutory provisions including provisions of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010 (collectively known as the Affordable Care Act) and the Medicare Improvements for Patients and Providers Act (MIPPA) of 2008. In addition, this final rule with comment period discusses payments for Part B drugs; Clinical Laboratory Fee Schedule: Signature on Requisition; Physician Quality Reporting System; the Electronic Prescribing (eRx) Incentive Program; the Physician Resource-Use Feedback Program and the value modifier; productivity adjustment for ambulatory surgical center payment system and the ambulance, clinical laboratory, and durable medical equipment prosthetics orthotics and supplies (DMEPOS) fee schedules; and other Part B related issues.

  13. Stochastic flow shop scheduling of overlapping jobs on tandem machines in application to optimizing the US Army's deliberate nuclear, biological, and chemical decontamination process, (final report). Master's thesis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Novikov, V.

    1991-05-01

    The U.S. Army's detailed equipment decontamination process is a stochastic flow shop which has N independent non-identical jobs (vehicles) which have overlapping processing times. This flow shop consists of up to six non-identical machines (stations). With the exception of one station, the processing times of the jobs are random variables. Based on an analysis of the processing times, the jobs for the 56 Army heavy division companies were scheduled according to the best shortest expected processing time - longest expected processing time (SEPT-LEPT) sequence. To assist in this scheduling the Gap Comparison Heuristic was developed to select the best SEPT-LEPTmore » schedule. This schedule was then used in balancing the detailed equipment decon line in order to find the best possible site configuration subject to several constraints. The detailed troop decon line, in which all jobs are independent and identically distributed, was then balanced. Lastly, an NBC decon optimization computer program was developed using the scheduling and line balancing results. This program serves as a prototype module for the ANBACIS automated NBC decision support system.... Decontamination, Stochastic flow shop, Scheduling, Stochastic scheduling, Minimization of the makespan, SEPT-LEPT Sequences, Flow shop line balancing, ANBACIS.« less

  14. Improvement in rheumatic fever and rheumatic heart disease management and prevention using a health centre-based continuous quality improvement approach.

    PubMed

    Ralph, Anna P; Fittock, Marea; Schultz, Rosalie; Thompson, Dale; Dowden, Michelle; Clemens, Tom; Parnaby, Matthew G; Clark, Michele; McDonald, Malcolm I; Edwards, Keith N; Carapetis, Jonathan R; Bailie, Ross S

    2013-12-18

    Rheumatic heart disease (RHD) remains a major health concern for Aboriginal Australians. A key component of RHD control is prevention of recurrent acute rheumatic fever (ARF) using long-term secondary prophylaxis with intramuscular benzathine penicillin (BPG). This is the most important and cost-effective step in RHD control. However, there are significant challenges to effective implementation of secondary prophylaxis programs. This project aimed to increase understanding and improve quality of RHD care through development and implementation of a continuous quality improvement (CQI) strategy. We used a CQI strategy to promote implementation of national best-practice ARF/RHD management guidelines at primary health care level in Indigenous communities of the Northern Territory (NT), Australia, 2008-2010. Participatory action research methods were employed to identify system barriers to delivery of high quality care. This entailed facilitated discussion with primary care staff aided by a system assessment tool (SAT). Participants were encouraged to develop and implement strategies to overcome identified barriers, including better record-keeping, triage systems and strategies for patient follow-up. To assess performance, clinical records were audited at baseline, then annually for two years. Key performance indicators included proportion of people receiving adequate secondary prophylaxis (≥80% of scheduled 4-weekly penicillin injections) and quality of documentation. Six health centres participated, servicing approximately 154 people with ARF/RHD. Improvements occurred in indicators of service delivery including proportion of people receiving ≥40% of their scheduled BPG (increasing from 81/116 [70%] at baseline to 84/103 [82%] in year three, p = 0.04), proportion of people reviewed by a doctor within the past two years (112/154 [73%] and 134/156 [86%], p = 0.003), and proportion of people who received influenza vaccination (57/154 [37%] to 86/156 [55%], p = 0.001). However, the proportion receiving ≥80% of scheduled BPG did not change. Documentation in medical files improved: ARF episode documentation increased from 31/55 (56%) to 50/62 (81%) (p = 0.004), and RHD risk category documentation from 87/154 (56%) to 103/145 (76%) (p < 0.001). Large differences in performance were noted between health centres, reflected to some extent in SAT scores. A CQI process using a systems approach and participatory action research methodology can significantly improve delivery of ARF/RHD care.

  15. 76 FR 73025 - Medicare Program; Payment Policies Under the Physician Fee Schedule, Five-Year Review of Work...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-28

    ...This final rule with comment period addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It also addresses, implements or discusses certain statutory provisions including provisions of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010 (collectively known as the Affordable Care Act) and the Medicare Improvements for Patients and Providers Act (MIPPA) of 2008. In addition, this final rule with comment period discusses payments for Part B drugs; Clinical Laboratory Fee Schedule: Signature on Requisition; Physician Quality Reporting System; the Electronic Prescribing (eRx) Incentive Program; the Physician Resource-Use Feedback Program and the value modifier; productivity adjustment for ambulatory surgical center payment system and the ambulance, clinical laboratory, and durable medical equipment prosthetics orthotics and supplies (DMEPOS) fee schedules; and other Part B related issues.

  16. AGM-88E Advanced Anti-Radiation Guided Missile (AGM-88E AARGM)

    DTIC Science & Technology

    2015-12-01

    0.0 0.0 Acq O&M 0.0 0.0 -- 0.0 0.0 0.0 0.0 Total 1528.5 1661.1 N/A 2107.4 1861.4 2026.2 2663.7 1 APB Breach Confidence Level Confidence Level of...normal conditions, encountering average levels of technical, schedule, and programmatic risk and external interference. Based on the rigor in methods...SAR Baseline to Current SAR Baseline (TY $M) Initial PAUC Development Estimate Changes PAUC Production Estimate Econ Qty Sch Eng Est Oth Spt Total

  17. System Engineering and Integration Contract for Implementation of the National Airspace System Plan. Volume 1. Sections 1.0-4.0, 6.0.

    DTIC Science & Technology

    1984-08-01

    recommendations in the report with Martin Marietta over the next few months. Appropriate followup actions will be deter- mined, and any program changes...Technical Feasibility and Validity ...... . . .. 1-6 1.3.2 Program Schedule . . . . . . ......... . .. 1-7 1.3.3 NAS Plan Cost...343.1.1 Overview 3-1 3.1.2 Findings, Risks, and Recommendations . . . . . . . . . 3-3 3.2 Program Schedule . . . . . . . . . . * . . * . *. . 3-6

  18. Determination of the Underlying Task Scheduling Algorithm for an Ada Runtime System

    DTIC Science & Technology

    1989-12-01

    was also curious as to how well I could model the test cases with Ada programs . In particular, I wanted to see whether I could model the equal arrival...parameter relationshis=s required to detect the execution of individual algorithms. These test cases were modeled using Ada programs . Then, the...results were analyzed to determine whether the Ada programs were capable of revealing the task scheduling algorithm used by the Ada run-time system. This

  19. Operations research methods improve chemotherapy patient appointment scheduling.

    PubMed

    Santibáñez, Pablo; Aristizabal, Ruben; Puterman, Martin L; Chow, Vincent S; Huang, Wenhai; Kollmannsberger, Christian; Nordin, Travis; Runzer, Nancy; Tyldesley, Scott

    2012-12-01

    Clinical complexity, scheduling restrictions, and outdated manual booking processes resulted in frequent clerical rework, long waitlists for treatment, and late appointment notification for patients at a chemotherapy clinic in a large cancer center in British Columbia, Canada. A 17-month study was conducted to address booking, scheduling and workload issues and to develop, implement, and evaluate solutions. A review of scheduling practices included process observation and mapping, analysis of historical appointment data, creation of a new performance metric (final appointment notification lead time), and a baseline patient satisfaction survey. Process improvement involved discrete event simulation to evaluate alternative booking practice scenarios, development of an optimization-based scheduling tool to improve scheduling efficiency, and change management for implementation of process changes. Results were evaluated through analysis of appointment data, a follow-up patient survey, and staff surveys. Process review revealed a two-stage scheduling process. Long waitlists and late notification resulted from an inflexible first-stage process. The second-stage process was time consuming and tedious. After a revised, more flexible first-stage process and an automated second-stage process were implemented, the median percentage of appointments exceeding the final appointment notification lead time target of one week was reduced by 57% and median waitlist size decreased by 83%. Patient surveys confirmed increased satisfaction while staff feedback reported reduced stress levels. Significant operational improvements can be achieved through process redesign combined with operations research methods.

  20. BEHAVIORAL MOMENTUM AND ACCUMULATION OF MASS IN MULTIPLE SCHEDULES

    PubMed Central

    Craig, Andrew R.; Cunningham, Paul J.; Shahan, Timothy A.

    2015-01-01

    Behavioral momentum theory suggests that the relation between a discriminative-stimulus situation and reinforcers obtained in that context (i.e., the Pavlovian stimulus–reinforcer relation) governs persistence of operant behavior. Within the theory, a mass-like aspect of behavior has been shown to be a power function of predisruption reinforcement rates. Previous investigations of resistance to change in multiple schedules, however, have been restricted to examining response persistence following protracted periods of stability in reinforcer rates within a discriminative situation. Thus, it is unclear how long a stimulus–reinforcer relation must be in effect prior to disruption in order to affect resistance to change. The present experiment examined resistance to change of pigeon’s key pecking following baseline conditions where reinforcer rates that were correlated with discriminative-stimulus situations changed. Across conditions, one multiple-schedule component arranged either relatively higher rates or lower rates of variable-interval food delivery, while the other component arranged the opposite rate. These schedules alternated between multiple-schedule components across blocks of sessions such that reinforcer rates in the components were held constant for 20, 5, 3, 2, or 1 session(s) between alternations. Resistance to extinction was higher in the component that most recently was associated with higher rates of food delivery in all conditions except when schedules alternated daily or every other day. These data suggest that resistance to change in multiple schedules is related to recently experienced reinforcer rates but only when multiple-schedule components are associated with specific reinforcer rates for several sessions. PMID:25787824

  1. Effects of an Advanced Sleep Schedule and Morning Short Wavelength Light Exposure on Circadian Phase in Young Adults with Late Sleep Schedules

    PubMed Central

    Sharkey, Katherine M.; Carskadon, Mary A.; Figueiro, Mariana G.; Zhu, Yong; Rea, Mark S.

    2011-01-01

    Objective We examined the effects of an advanced sleep/wake schedule and morning short wavelength (blue) light in 25 adults (mean age±SD = 21.8±3 years; 13 women) with late sleep schedules and subclinical features of delayed sleep phase syndrome (DSPD). Methods After a baseline week, participants kept individualized, fixed, advanced 7.5-hour sleep schedules for 6 days. Participants were randomly assigned to groups to receive “blue” (470 nm, ~225 lux, n=12) or “dim” (< 1 lux, n=13) light for one hour after waking each day. Head-worn “Daysimeters” measured light exposure; actigraphs and sleep diaries confirmed schedule compliance. Salivary dim light melatonin onset (DLMO), self-reported sleep, and mood were examined with 2×2 ANOVA. Results After 6 days, both groups showed significant circadian phase advances, but morning blue-light was not associated with larger phase shifts than dim-light exposure. The average DLMO advances (mean±SD) were 1.5±1.1 hours in the dim light group and 1.4±0.7 hours in the blue light group. Conclusions Adherence to a fixed advanced sleep/wake schedule resulted in significant circadian phase shifts in young adults with subclinical DSPD with or without morning blue light exposure. Light/dark exposures associated with fixed early sleep schedules are sufficient to advance circadian phase in young adults. PMID:21704557

  2. Effects of an advanced sleep schedule and morning short wavelength light exposure on circadian phase in young adults with late sleep schedules.

    PubMed

    Sharkey, Katherine M; Carskadon, Mary A; Figueiro, Mariana G; Zhu, Yong; Rea, Mark S

    2011-08-01

    We examined the effects of an advanced sleep/wake schedule and morning short wavelength (blue) light in 25 adults (mean age±SD=21.8±3 years; 13 women) with late sleep schedules and subclinical features of delayed sleep phase disorder (DSPD). After a baseline week, participants kept individualized, fixed, advanced 7.5-h sleep schedules for 6days. Participants were randomly assigned to groups to receive "blue" (470nm, ∼225lux, n=12) or "dim" (<1lux, n=13) light for 1h after waking each day. Head-worn "Daysimeters" measured light exposure; actigraphs and sleep diaries confirmed schedule compliance. Salivary dim light melatonin onset (DLMO), self-reported sleep, and mood were examined with 2×2 ANOVA. After 6days, both groups showed significant circadian phase advances, but morning blue light was not associated with larger phase shifts than dim-light exposure. The average DLMO advances (mean±SD) were 1.5±1.1h in the dim light group and 1.4±0.7h in the blue light group. Adherence to a fixed advanced sleep/wake schedule resulted in significant circadian phase shifts in young adults with subclinical DSPD with or without morning blue light exposure. Light/dark exposures associated with fixed early sleep schedules are sufficient to advance circadian phase in young adults. Copyright © 2011 Elsevier B.V. All rights reserved.

  3. The nurse scheduling problem: a goal programming and nonlinear optimization approaches

    NASA Astrophysics Data System (ADS)

    Hakim, L.; Bakhtiar, T.; Jaharuddin

    2017-01-01

    Nurses scheduling is an activity of allocating nurses to conduct a set of tasks at certain room at a hospital or health centre within a certain period. One of obstacles in the nurse scheduling is the lack of resources in order to fulfil the needs of the hospital. Nurse scheduling which is undertaken manually will be at risk of not fulfilling some nursing rules set by the hospital. Therefore, this study aimed to perform scheduling models that satisfy all the specific rules set by the management of Bogor State Hospital. We have developed three models to overcome the scheduling needs. Model 1 is designed to schedule nurses who are solely assigned to a certain inpatient unit and Model 2 is constructed to manage nurses who are assigned to an inpatient room as well as at Polyclinic room as conjunct nurses. As the assignment of nurses on each shift is uneven, then we propose Model 3 to minimize the variance of the workload in order to achieve equitable assignment on every shift. The first two models are formulated in goal programming framework, while the last model is in nonlinear optimization form.

  4. Trajectories of Substance Use Disorder in Youth After Detention: A 12-Year Longitudinal Study.

    PubMed

    Welty, Leah J; Hershfield, Jennifer A; Abram, Karen M; Han, Hongyun; Byck, Gayle R; Teplin, Linda A

    2017-02-01

    To identify trajectories of substance use disorders (SUDs) in youth during the 12 years after detention and how gender, race/ethnicity, and age at baseline predict trajectories. As part of the Northwestern Juvenile Project, a longitudinal study of 1,829 youth randomly sampled from detention in Chicago, Illinois from 1995 through 1998, participants were reinterviewed in the community or correctional facilities up to 9 times over 12 years. Independent interviewers assessed SUDs using the Diagnostic Interview Schedule for Children 2.3 (baseline) and the Diagnostic Interview Schedule IV (follow-ups). Primary outcome was a mutually exclusive 5-category typology of disorder: no SUD, alcohol alone, marijuana alone, comorbid alcohol and marijuana, or "other" illicit ("hard") drug. Trajectories were estimated using growth mixture models with a 3-category ordinal variable derived from the typology. During the 12-year follow-up, 19.6% of youth did not have an SUD. The remaining 81.4% were in 3 trajectory classes. Class 1 (24.5%), a bell-shaped trajectory, peaked 5 years after baseline when 42.7% had an SUD and 12.5% had comorbid or "other" illicit drug disorders. Class 2 (41.3%) had a higher prevalence of SUD at baseline, 73.8%. Although prevalence decreased over time, 23.5% had an SUD 12 years later. Class 3 (14.6%), the most serious and persistent trajectory, had the highest prevalence of comorbid or "other" illicit drug disorders-52.1% at baseline and 17.4% 12 years later. Males, Hispanics, non-Hispanic whites, and youth who were older at baseline (detention) had the worst outcomes. Gender, race/ethnicity, and age at detention predict trajectories of SUDs in delinquent youth. Findings provide an empirical basis for child psychiatry to address health disparities and improve prevention. Copyright © 2016 American Academy of Child and Adolescent Psychiatry. Published by Elsevier Inc. All rights reserved.

  5. Shuttle Rocket Motor Program: NASA should delay awarding some construction contracts. Report to the Chair, Subcommittee on Government Activities and Transportation, Committee on Government Operations, House of Representatives

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.

  6. Combining community participatory research with a randomized clinical trial: the Protecting the Hood Against Tobacco (PHAT) smoking cessation study.

    PubMed

    Froelicher, Erika Sivarajan; Doolan, Daniel; Yerger, Valerie B; McGruder, Carol O; Malone, Ruth E

    2010-01-01

    This article describes the process and results of a smoking cessation intervention randomized clinical trial (RCT) that was conducted as a community-based participatory research project. This RCT tested whether outcomes are improved by adding social justice and tobacco industry targeting messages to a smoking cessation program conducted among African American adults within a low-income community in San Francisco, California. This study provides lessons for future similar research projects that focus on urban low-income populations. Participants were randomly allocated to receive a smoking-cessation program (control group [CG]) or CG care plus tobacco industry and media (IAM) messages. Primary interventions were behavioral. At intake, participants reporting severe withdrawal or smoking > or = 25 cigarettes daily were offered free nicotine replacement therapy. Baseline data were from an in-person interview. Outcome measures included self-reported smoking status; validation of quitting was by salivary cotinine assays. Of 87 participants providing baseline data, 31% (27) did not join the RCT. Proportions quitting in the CG and IAM group were 11.5% and 13.6% at 6 months and 5.3% and 15.8% at 12 months, respectively. African Americans in underserved inner-city neighborhoods can be recruited into RCTs with community participatory approaches. Differences between the CG and IAM in proportions who quit were 2.1% and 10.5% at 6 and 12 months, respectively. More than 3 years with adequate funding, high staffing ratios, and intense outreach and follow-up schedules are needed to achieve recruitment and study goals. 2010 Elsevier Inc. All rights reserved.

  7. HIFiRE Direct-Connect Rig (HDCR) Phase I Ground Test Results from the NASA Langley Arc-Heated Scramjet Test Facility

    NASA Technical Reports Server (NTRS)

    Hass, Neal E.; Cabell, Karen F.; Storch, Andrea M.

    2010-01-01

    The initial phase of hydrocarbon-fueled ground tests supporting Flight 2 of the Hypersonic International Flight Research Experiment (HIFiRE) Program has been conducted in the NASA Langley Arc-Heated Scramjet Test Facility (AHSTF). The HIFiRE Program, an Air Force-lead international cooperative program includes eight different flight test experiments designed to target specific challenges of hypersonic flight. The second of the eight planned flight experiments is a hydrocarbon-fueled scramjet flight test intended to demonstrate dual-mode to scramjet-mode operation and verify the scramjet performance prediction and design tools. A performance goal is the achievement of a combusted fuel equivalence ratio greater than 0.7 while in scramjet mode. The ground test rig, designated the HIFiRE Direct Connect Rig (HDCR), is a full-scale, heat sink, direct-connect ground test article that duplicates both the flowpath lines and the instrumentation layout of the isolator and combustor portion of the flight test hardware. The primary objectives of the HDCR Phase I tests are to verify the operability of the HIFiRE isolator/combustor across the Mach 6.0-8.0 flight regime and to establish a fuel distribution schedule to ensure a successful mode transition prior to the HiFIRE payload Critical Design Review. Although the phase I test plans include testing over the Mach 6 to 8 flight simulation range, only Mach 6 testing will be reported in this paper. Experimental results presented here include flowpath surface pressure, temperature, and heat flux distributions that demonstrate the operation of the flowpath over a small range of test conditions around the nominal Mach 6 simulation, as well as a range of fuel equivalence ratios and fuel injection distributions. Both ethylene and a mixture of ethylene and methane (planned for flight) were tested. Maximum back pressure and flameholding limits, as well as a baseline fuel schedule, that covers the Mach 5.84-6.5 test space have been identified.

  8. From non-preemptive to preemptive scheduling using synchronization synthesis.

    PubMed

    Černý, Pavol; Clarke, Edmund M; Henzinger, Thomas A; Radhakrishna, Arjun; Ryzhyk, Leonid; Samanta, Roopsha; Tarrach, Thorsten

    2017-01-01

    We present a computer-aided programming approach to concurrency. The approach allows programmers to program assuming a friendly, non-preemptive scheduler, and our synthesis procedure inserts synchronization to ensure that the final program works even with a preemptive scheduler. The correctness specification is implicit, inferred from the non-preemptive behavior. Let us consider sequences of calls that the program makes to an external interface. The specification requires that any such sequence produced under a preemptive scheduler should be included in the set of sequences produced under a non-preemptive scheduler. We guarantee that our synthesis does not introduce deadlocks and that the synchronization inserted is optimal w.r.t. a given objective function. The solution is based on a finitary abstraction, an algorithm for bounded language inclusion modulo an independence relation, and generation of a set of global constraints over synchronization placements. Each model of the global constraints set corresponds to a correctness-ensuring synchronization placement. The placement that is optimal w.r.t. the given objective function is chosen as the synchronization solution. We apply the approach to device-driver programming, where the driver threads call the software interface of the device and the API provided by the operating system. Our experiments demonstrate that our synthesis method is precise and efficient. The implicit specification helped us find one concurrency bug previously missed when model-checking using an explicit, user-provided specification. We implemented objective functions for coarse-grained and fine-grained locking and observed that different synchronization placements are produced for our experiments, favoring a minimal number of synchronization operations or maximum concurrency, respectively.

  9. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    PubMed

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  10. 10 CFR Appendix A to Part 602 - Schedule of Renewal Applications and Reports

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Schedule of Renewal Applications and Reports A Appendix A to Part 602 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS EPIDEMIOLOGY AND OTHER HEALTH STUDIES FINANCIAL ASSISTANCE PROGRAM Pt. 602, App. A Appendix A to Part 602—Schedule of Renewal...

  11. 10 CFR Appendix A to Part 602 - Schedule of Renewal Applications and Reports

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Schedule of Renewal Applications and Reports A Appendix A to Part 602 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS EPIDEMIOLOGY AND OTHER HEALTH STUDIES FINANCIAL ASSISTANCE PROGRAM Pt. 602, App. A Appendix A to Part 602—Schedule of Renewal...

  12. 10 CFR Appendix A to Part 602 - Schedule of Renewal Applications and Reports

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Schedule of Renewal Applications and Reports A Appendix A to Part 602 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS EPIDEMIOLOGY AND OTHER HEALTH STUDIES FINANCIAL ASSISTANCE PROGRAM Pt. 602, App. A Appendix A to Part 602—Schedule of Renewal...

  13. User’s guide to SNAP for ArcGIS® :ArcGIS interface for scheduling and network analysis program

    Treesearch

    Woodam Chung; Dennis Dykstra; Fred Bower; Stephen O’Brien; Richard Abt; John. and Sessions

    2012-01-01

    This document introduces a computer software named SNAP for ArcGIS® , which has been developed to streamline scheduling and transportation planning for timber harvest areas. Using modern optimization techniques, it can be used to spatially schedule timber harvest with consideration of harvesting costs, multiple products, alternative...

  14. Development of Milestone Schedules for Selected Logistics Support Directorate Programs. Appendix A. Part 2. Task Summaries.

    DTIC Science & Technology

    1987-09-15

    MAC; CODE NUMBER: NONE AND REPAIR PARTS AND SPECIAL TOOLS LIST (RPSTL). RESPONSIBILITY: ROY & ILS DURATION: 32.00 WORK DAYS PRE PPPL SCHEDULE...ILS DURATION: 22.00 WORK DAYS R/V PPPL SCHEDULE: DVPMARPS REVIEW AND VALIDATE PRELIMINARY PROVISIONING PARTS LIST. CODE NUMBER: NONE RESPONSIBILITY

  15. The application of statistically designed experiments to resistance spot welding

    NASA Technical Reports Server (NTRS)

    Hafley, Robert A.; Hales, Stephen J.

    1991-01-01

    State-of-the-art Resistance Spot Welding (RSW) equipment has the potential to permit realtime monitoring of operations through advances in computerized process control. In order to realize adaptive feedback capabilities, it is necessary to establish correlations among process variables, welder outputs, and weldment properties. The initial step toward achieving this goal must involve assessment of the effect of specific process inputs and the interactions among these variables on spot weld characteristics. This investigation evaluated these effects through the application of a statistically designed experiment to the RSW process. A half-factorial, Taguchi L sub 16 design was used to understand and refine a RSW schedule developed for welding dissimilar aluminum-lithium alloys of different thickness. The baseline schedule had been established previously by traditional trial and error methods based on engineering judgment and one-factor-at-a-time studies. A hierarchy of inputs with respect to each other was established, and the significance of these inputs with respect to experimental noise was determined. Useful insight was gained into the effect of interactions among process variables, particularly with respect to weldment defects. The effects of equipment related changes associated with disassembly and recalibration were also identified. In spite of an apparent decrease in equipment performance, a significant improvement in the maximum strength for defect-free welds compared to the baseline schedule was achieved.

  16. A primary shift rotation nurse scheduling using zero-one linear goal programming.

    PubMed

    Huarng, F

    1999-01-01

    In this study, the author discusses the effect of nurse shift schedules on circadian rhythm and some important ergonomics criteria. The author also reviews and compares different nurse shift scheduling methods via the criteria of flexibility, fairness, continuity in shift assignments, nurses' preferences, and ergonomics principles. In this article, a primary shift rotation system is proposed to provide better continuity in shift assignments to satisfy nurses' preferences. The primary shift rotation system is modeled as a zero-one linear goal programming (LGP) problem. To generate the shift assignment for a unit with 13 nurses, the zero-one LGP model takes less than 3 minutes on average, whereas the head nurses spend approximately 2 to 3 hours on shift scheduling. This study reports the process of implementing the primary shift rotation system.

  17. A Telerehabilitation Program Improves Postural Control in Multiple Sclerosis Patients: A Spanish Preliminary Study

    PubMed Central

    Ortiz-Gutiérrez, Rosa; Cano-de-la-Cuerda, Roberto; Galán-del-Río, Fernando; Alguacil-Diego, Isabel María; Palacios-Ceña, Domingo; Miangolarra-Page, Juan Carlos

    2013-01-01

    Postural control disorders are among the most frequent motor disorder symptoms associated with multiple sclerosis. This study aims to demonstrate the potential improvements in postural control among patients with multiple sclerosis who complete a telerehabilitation program that represents a feasible alternative to physical therapy for situations in which conventional treatment is not available. Fifty patients were recruited. Control group (n = 25) received physiotherapy treatment twice a week (40 min per session). Experimental group (n = 25) received monitored telerehabilitation treatment via videoconference using the Xbox 360® and Kinect console. Experimental group attended 40 sessions, four sessions per week (20 min per session).The treatment schedule lasted 10 weeks for both groups. A computerized dynamic posturography (Sensory Organization Test) was used to evaluate all patients at baseline and at the end of the treatment protocol. Results showed an improvement over general balance in both groups. Visual preference and the contribution of vestibular information yielded significant differences in the experimental group. Our results demonstrated that a telerehabilitation program based on a virtual reality system allows one to optimize the sensory information processing and integration systems necessary to maintain the balance and postural control of people with multiple sclerosis. We suggest that our virtual reality program enables anticipatory PC and response mechanisms and might serve as a successful therapeutic alternative in situations in which conventional therapy is not readily available. PMID:24185843

  18. An Experimental Trial of Adaptive Programming in Drug Court: Outcomes at 6, 12 and 18 Months.

    PubMed

    Marlowe, Douglas B; Festinger, David S; Dugosh, Karen L; Benasutti, Kathleen M; Fox, Gloria; Harron, Ashley

    2014-06-01

    Test whether an adaptive program improves outcomes in drug court by adjusting the schedule of court hearings and clinical case-management sessions pursuant to a priori performance criteria. Consenting participants in a misdemeanor drug court were randomly assigned to the adaptive program (n = 62) or to a baseline-matching condition (n = 63) in which they attended court hearings based on the results of a criminal risk assessment. Outcome measures were re-arrest rates at 18 months post-entry to the drug court and urine drug test results and structured interview results at 6 and 12 months post-entry. Although previously published analyses revealed significantly fewer positive drug tests for participants in the adaptive condition during the first 18 weeks of drug court, current analyses indicate the effects converged during the ensuing year. Between-group differences in new arrest rates, urine drug test results and self-reported psychosocial problems were small and non-statistically significant at 6, 12 and 18 months post-entry. A non-significant trend (p = .10) suggests there may have been a small residual impact (Cramer's ν = .15) on new misdemeanor arrests after 18 months. Adaptive programming shows promise for enhancing short-term outcomes in drug courts; however, additional efforts are needed to extend the effects beyond the first 4 to 6 months of enrollment.

  19. Impact of a Student-Scheduled Child Care Program on Parents' Educational Goals

    ERIC Educational Resources Information Center

    Carter, Barbara

    2016-01-01

    The purpose of this study is to examine what, if any, impact a Student-scheduled Child Care (SSCC) program had on the families of students completing their higher education goals at a college in the southwestern region of the United States. Student completion rate is a concern for most college and university administrators. Research conducted by…

  20. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Physical Protection of Irradiated Reactor Fuel in Transit... Irradiated Reactor Fuel in Transit, Training Program Subject Schedule Pursuant to the provision of § 73.37 of... reactor fuel is required to assure that individuals used as shipment escorts have completed a training...

  1. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Physical Protection of Irradiated Reactor Fuel in Transit... Irradiated Reactor Fuel in Transit, Training Program Subject Schedule Pursuant to the provision of § 73.37 of... reactor fuel is required to assure that individuals used as shipment escorts have completed a training...

  2. Autonomous power expert system

    NASA Technical Reports Server (NTRS)

    Ringer, Mark J.; Quinn, Todd M.

    1990-01-01

    The goal of the Autonomous Power System (APS) program is to develop and apply intelligent problem solving and control technologies to the Space Station Freedom Electrical Power Systems (SSF/EPS). The objectives of the program are to establish artificial intelligence/expert system technology paths, to create knowledge based tools with advanced human-operator interfaces, and to integrate and interface knowledge-based and conventional control schemes. This program is being developed at the NASA-Lewis. The APS Brassboard represents a subset of a 20 KHz Space Station Power Management And Distribution (PMAD) testbed. A distributed control scheme is used to manage multiple levels of computers and switchgear. The brassboard is comprised of a set of intelligent switchgear used to effectively switch power from the sources to the loads. The Autonomous Power Expert System (APEX) portion of the APS program integrates a knowledge based fault diagnostic system, a power resource scheduler, and an interface to the APS Brassboard. The system includes knowledge bases for system diagnostics, fault detection and isolation, and recommended actions. The scheduler autonomously assigns start times to the attached loads based on temporal and power constraints. The scheduler is able to work in a near real time environment for both scheduling and dynamic replanning.

  3. Autonomous power expert system

    NASA Technical Reports Server (NTRS)

    Ringer, Mark J.; Quinn, Todd M.

    1990-01-01

    The goal of the Autonomous Power System (APS) program is to develop and apply intelligent problem solving and control technologies to the Space Station Freedom Electrical Power Systems (SSF/EPS). The objectives of the program are to establish artificial intelligence/expert system technology paths, to create knowledge based tools with advanced human-operator interfaces, and to integrate and interface knowledge-based and conventional control schemes. This program is being developed at the NASA-Lewis. The APS Brassboard represents a subset of a 20 KHz Space Station Power Management And Distribution (PMAD) testbed. A distributed control scheme is used to manage multiple levels of computers and switchgear. The brassboard is comprised of a set of intelligent switchgear used to effectively switch power from the sources to the loads. The Autonomous Power Expert System (APEX) portion of the APS program integrates a knowledge based fault diagnostic system, a power resource scheduler, and an interface to the APS Brassboard. The system includes knowledge bases for system diagnostics, fault detection and isolation, and recommended actions. The scheduler autonomously assigns start times to the attached loads based on temporal and power constraints. The scheduler is able to work in a near real time environment for both scheduling an dynamic replanning.

  4. 75 FR 37787 - Combined Notice of Filings # 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... proposal to revise the Forward Capacity Market rules. Filed Date: 06/14/2010. Accession Number: 20100615... Succession and a revised rate schedule. Filed Date: 06/22/2010. Accession Number: 20100622-0212. Comment Date.... Description: KGen Hot Spring LLC submits tariff filing per 35.12: Initial Baseline Market Based Rate Tariff...

  5. Infant Sign Training and Functional Analysis

    ERIC Educational Resources Information Center

    Normand, Matthew P.; Machado, Mychal A.; Hustyi, Kristin M.; Morley, Allison J.

    2011-01-01

    We taught manual signs to typically developing infants using a reversal design and caregiver-nominated stimuli. We delivered the stimuli on a time-based schedule during baseline. During the intervention, we used progressive prompting and reinforcement, described by Thompson et al. (2004, 2007), to establish mands. Following sign training, we…

  6. Low Cost Large Core Vehicle Structures Assessment

    NASA Technical Reports Server (NTRS)

    Hahn, Steven E.

    1998-01-01

    Boeing Information, Space, and Defense Systems executed a Low Cost Large Core Vehicle Structures Assessment (LCLCVSA) under contract to NASA Marshall Space Flight Center (MSFC) between November 1997 and March 1998. NASA is interested in a low-cost launch vehicle, code named Magnum, to place heavy payloads into low earth orbit for missions such as a manned mission to Mars, a Next Generation Space Telescope, a lunar-based telescope, the Air Force's proposed space based laser, and large commercial satellites. In this study, structural concepts with the potential to reduce fabrication costs were evaluated in application to the Magnum Launch Vehicle (MLV) and the Liquid Fly Back Booster (LFBB) shuttle upgrade program. Seventeen concepts were qualitatively evaluated to select four concepts for more in-depth study. The four structural concepts selected were: an aluminum-lithium monocoque structure, an aluminum-lithium machined isogrid structure, a unitized composite sandwich structure, and a unitized composite grid structure. These were compared against a baseline concept based on the Space Shuttle External Tank (ET) construction. It was found that unitized composite structures offer significant cost and weight benefits to MLV structures. The limited study of application to LFBB structures indicated lower, but still significant benefits. Technology and facilities development roadmaps to prepare the approaches studied for application to MLV and LFBB were constructed. It was found that the cost and schedule to develop these approaches were in line with both MLV and LFBB development schedules. Current Government and Boeing programs which address elements of the development of the technologies identified are underway. It is recommended that NASA devote resources in a timely fashion to address the specific elements related to MLV and LFBB structures.

  7. A Comparison of Earned Value Management and Earned Schedule as Schedule Predictors on DoD ACAT I Programs

    DTIC Science & Technology

    2013-03-01

    33 Mario Vanhoucke and Stephan Vandevoorde – “Measuring the Accuracy of Earned Value/Earned Schedule Forecasting Predictors” (2007...technical problem to the present day ‘ super projects’” (Clark and Lorenzoni, 1997: 2). Cost engineering has “application regardless of industry...large construction projects, but also the acceptance of earned schedule principles on an international scale. Mario Vanhoucke and Stephan Vandevoorde

  8. A Network Flow Approach to the Initial Skills Training Scheduling Problem

    DTIC Science & Technology

    2007-12-01

    include (but are not limited to) queuing theory, stochastic analysis and simulation. After the demand schedule has been estimated, it can be ...software package has already been purchased and is in use by AFPC, AFPC has requested that the new algorithm be programmed in this language as well ...the discussed outputs from those schedules. Required Inputs A single input file details the students to be scheduled as well as the courses

  9. Range and mission scheduling automation using combined AI and operations research techniques

    NASA Technical Reports Server (NTRS)

    Arbabi, Mansur; Pfeifer, Michael

    1987-01-01

    Ground-based systems for Satellite Command, Control, and Communications (C3) operations require a method for planning, scheduling and assigning the range resources such as: antenna systems scattered around the world, communications systems, and personnel. The method must accommodate user priorities, last minute changes, maintenance requirements, and exceptions from nominal requirements. Described are computer programs which solve 24 hour scheduling problems, using heuristic algorithms and a real time interactive scheduling process.

  10. Scheduling Guide for Program Managers

    DTIC Science & Technology

    2001-10-01

    58 Chapter 8 TIME MANAGEMENT ....................................................................................... 59...8.1 Time Management and the Program...60 8.2 Time Management and the Program Manager

  11. Airspace Technology Demonstration 2 (ATD-2) Technology Description Document (TDD)

    NASA Technical Reports Server (NTRS)

    Ging, Andrew; Engelland, Shawn; Capps, Al; Eshow, Michelle; Jung, Yoon; Sharma, Shivanjli; Talebi, Ehsan; Downs, Michael; Freedman, Cynthia; Ngo, Tyler; hide

    2018-01-01

    This Technology Description Document (TDD) provides an overview of the technology for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of the National Aeronautics and Space Administration's (NASA) Airspace Technology Demonstration 2 (ATD-2) project, to be demonstrated beginning in 2017 at Charlotte Douglas International Airport (CLT). Development, integration, and field demonstration of relevant technologies of the IADS system directly address recommendations made by the Next Generation Air Transportation System (NextGen) Integration Working Group (NIWG) on Surface and Data Sharing and the Surface Collaborative Decision Making (Surface CDM) concept of operations developed jointly by the Federal Aviation Administration (FAA) and aviation industry partners. NASA is developing the IADS traffic management system under the ATD-2 project in coordination with the FAA, flight operators, CLT airport, and the National Air Traffic Controllers Association (NATCA). The primary goal of ATD-2 is to improve the predictability and operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 project is a 5-year research activity beginning in 2015 and extending through 2020. The Phase 1 Baseline IADS capability resulting from the ATD-2 research will be demonstrated at the CLT airport beginning in 2017. Phase 1 will provide the initial demonstration of the integrated system with strategic and tactical scheduling, tactical departure scheduling to an en route meter point, and an early implementation prototype of a Terminal Flight Data Manager (TFDM) Electronic Flight Data (EFD) system. The strategic surface scheduling element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.

  12. Monte Carlo Simulations for VLBI2010

    NASA Astrophysics Data System (ADS)

    Wresnik, J.; Böhm, J.; Schuh, H.

    2007-07-01

    Monte Carlo simulations are carried out at the Institute of Geodesy and Geophysics (IGG), Vienna, and at Goddard Space Flight Center (GSFC), Greenbelt (USA), with the goal to design a new geodetic Very Long Baseline Interferometry (VLBI) system. Influences of the schedule, the network geometry and the main stochastic processes on the geodetic results are investigated. Therefore schedules are prepared with the software package SKED (Vandenberg 1999), and different strategies are applied to produce temporally very dense schedules which are compared in terms of baseline length repeatabilities. For the simulation of VLBI observations a Monte Carlo Simulator was set up which creates artificial observations by randomly simulating wet zenith delay and clock values as well as additive white noise representing the antenna errors. For the simulation at IGG the VLBI analysis software OCCAM (Titov et al. 2004) was adapted. Random walk processes with power spectrum densities of 0.7 and 0.1 psec2/sec are used for the simulation of wet zenith delays. The clocks are simulated with Allan Standard Deviations of 1*10^-14 @ 50 min and 2*10^-15 @ 15 min and three levels of white noise, 4 psec, 8 psec and, 16 psec, are added to the artificial observations. The variations of the power spectrum densities of the clocks and wet zenith delays, and the application of different white noise levels show clearly that the wet delay is the critical factor for the improvement of the geodetic VLBI system. At GSFC the software CalcSolve is used for the VLBI analysis, therefore a comparison between the software packages OCCAM and CalcSolve was done with simulated data. For further simulations the wet zenith delay was modeled by a turbulence model. This data was provided by Nilsson T. and was added to the simulation work. Different schedules have been run.

  13. Scheduling algorithms for rapid imaging using agile Cubesat constellations

    NASA Astrophysics Data System (ADS)

    Nag, Sreeja; Li, Alan S.; Merrick, James H.

    2018-02-01

    Distributed Space Missions such as formation flight and constellations, are being recognized as important Earth Observation solutions to increase measurement samples over space and time. Cubesats are increasing in size (27U, ∼40 kg in development) with increasing capabilities to host imager payloads. Given the precise attitude control systems emerging in the commercial market, Cubesats now have the ability to slew and capture images within short notice. We propose a modular framework that combines orbital mechanics, attitude control and scheduling optimization to plan the time-varying, full-body orientation of agile Cubesats in a constellation such that they maximize the number of observed images and observation time, within the constraints of Cubesat hardware specifications. The attitude control strategy combines bang-bang and PD control, with constraints such as power consumption, response time, and stability factored into the optimality computations and a possible extension to PID control to account for disturbances. Schedule optimization is performed using dynamic programming with two levels of heuristics, verified and improved upon using mixed integer linear programming. The automated scheduler is expected to run on ground station resources and the resultant schedules uplinked to the satellites for execution, however it can be adapted for onboard scheduling, contingent on Cubesat hardware and software upgrades. The framework is generalizable over small steerable spacecraft, sensor specifications, imaging objectives and regions of interest, and is demonstrated using multiple 20 kg satellites in Low Earth Orbit for two case studies - rapid imaging of Landsat's land and coastal images and extended imaging of global, warm water coral reefs. The proposed algorithm captures up to 161% more Landsat images than nadir-pointing sensors with the same field of view, on a 2-satellite constellation over a 12-h simulation. Integer programming was able to verify that optimality of the dynamic programming solution for single satellites was within 10%, and find up to 5% more optimal solutions. The optimality gap for constellations was found to be 22% at worst, but the dynamic programming schedules were found at nearly four orders of magnitude better computational speed than integer programming. The algorithm can include cloud cover predictions, ground downlink windows or any other spatial, temporal or angular constraints into the orbital module and be integrated into planning tools for agile constellations.

  14. An innovative approach for distributed and integrated resources planning for the Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda S.; Shinkle, Gerald L.; Weiler, Jerry D.; Willoughby, John K.

    1990-01-01

    This paper presents a planning approach to the Space Station Freedom program which takes into account the widely distributed nature of that program. The program management structure is organized into three major levels: a strategic level, a tactical level, and an execution level. For each level, resource availabilities are determined, the resources are distributed, schedules are built independently within the resource limits, the schedules are integrated into a single schedule, and conflicts are resolved by negotiating requirements and/or relaxing contraints. This approach distributes resources to multiple planning entities in such a way that when the multiple plans are collected, they fit together with minimal modification. The up-front distribution is planned in such a way and to a sufficient degree that a fit is virtually assured.

  15. Effects of strategic versus tactical instructions on adaptation to changing contingencies in children with adhd.

    PubMed

    Bicard, David E; Neef, Nancy A

    2002-01-01

    This study examined the effects of two types of instructions on the academic responding of 4 children with attention deficit hyperactivity disorder. Tactical instructions specified how to distribute responding between two concurrently available sets of math problems associated with different variable-interval schedules of reinforcement. Strategic instructions provided a strategy to determine the best way to distribute responding. Instruction conditions were counterbalanced in an ABAB/BABA reversal design nested within a multiple baseline across participants design. Experimental sessions consisted of a learning session in which participants were provided with one type of instruction, followed by a test session in which no instruction was provided. The schedules of reinforcement were subsequently reversed during test sessions. When learning and test schedules were identical, the responding of all 4 participants closely matched the reinforcement schedules. When tactical instructions were provided and schedules were subsequently changed, responding often remained under the control of the instructions. When strategic instructions were provided, responding more quickly adapted to the changed contingencies. Analysis of postsession verbal reports indicated correspondence between the participants' verbal descriptions (whether accurate or inaccurate) and their nonverbal patterns of responding.

  16. Improving patient access to an interventional US clinic.

    PubMed

    Steele, Joseph R; Clarke, Ryan K; Terrell, John A; Brightmon, Tonya R

    2014-01-01

    A continuous quality improvement project was conducted to increase patient access to a neurointerventional ultrasonography (US) clinic. The clinic was experiencing major scheduling delays because of an increasing patient volume. A multidisciplinary team was formed that included schedulers, medical assistants, nurses, technologists, and physicians. The team created an Ishikawa diagram of the possible causes of the long wait time to the next available appointment and developed a flowchart of the steps involved in scheduling and completing a diagnostic US examination and biopsy. The team then implemented a staged intervention that included adjustments to staffing and room use (stage 1); new procedures for scheduling same-day add-on appointments (stage 2); and a lead technician rotation to optimize patient flow, staffing, and workflow (stage 3). Six months after initiation of the intervention, the mean time to the next available appointment had decreased from 25 days at baseline to 1 day, and the number of available daily appointments had increased from 38 to 55. These improvements resulted from a coordinated provider effort and had a net present value of more than $275,000. This project demonstrates that structural changes in staffing, workflow, and room use can substantially reduce scheduling delays for critical imaging procedures. © RSNA, 2014.

  17. Owning the program technical baseline for future space systems acquisition: program technical baseline tracking tool

    NASA Astrophysics Data System (ADS)

    Nguyen, Tien M.; Guillen, Andy T.; Hant, James J.; Kizer, Justin R.; Min, Inki A.; Siedlak, Dennis J. L.; Yoh, James

    2017-05-01

    The U.S. Air Force (USAF) has recognized the needs for owning the program and technical knowledge within the Air Force concerning the systems being acquired to ensure success. This paper extends the previous work done by the authors [1-2] on the "Resilient Program Technical Baseline Framework for Future Space Systems" and "Portfolio Decision Support Tool (PDST)" to the development and implementation of the Program and Technical Baseline (PTB) Tracking Tool (PTBTL) for the DOD acquisition life cycle. The paper describes the "simplified" PTB tracking model with a focus on the preaward phases and discusses how to implement this model in PDST.

  18. Scheduling Algorithm for Mission Planning and Logistics Evaluation (SAMPLE). Volume 3: The GREEDY algorithm

    NASA Technical Reports Server (NTRS)

    Dupnick, E.; Wiggins, D.

    1980-01-01

    The functional specifications, functional design and flow, and the program logic of the GREEDY computer program are described. The GREEDY program is a submodule of the Scheduling Algorithm for Mission Planning and Logistics Evaluation (SAMPLE) program and has been designed as a continuation of the shuttle Mission Payloads (MPLS) program. The MPLS uses input payload data to form a set of feasible payload combinations; from these, GREEDY selects a subset of combinations (a traffic model) so all payloads can be included without redundancy. The program also provides the user a tutorial option so that he can choose an alternate traffic model in case a particular traffic model is unacceptable.

  19. Preflight and In-Flight Exercise Conditions for Astronauts on the International Space Station

    NASA Technical Reports Server (NTRS)

    Guilliams, Mark E.; Nieschwitz, Bruce; Hoellen, David; Loehr, Jim

    2011-01-01

    The physiological demands of spaceflight require astronauts to have certain physical abilities. They must be able to perform routine and off-nominal physical work during flight and upon re-entry into a gravity environment to ensure mission success, such as an Extra Vehicular Activity (EVA) or emergency egress. To prepare the astronauts for their mission, a Wyle Astronaut Strength Conditioning and Rehabilitation specialist (ASCR) works individually with the astronauts to prescribe preflight strength and conditioning programs and in-flight exercise, utilizing Countermeasure Systems (CMS) exercise hardware. PURPOSE: To describe the preflight and in-flight exercise programs for ISS crewmembers. METHODS: Approximately 2 years before a scheduled launch, an ASCR is assigned to each astronaut and physical training (PT) is routinely scheduled. Preflight PT of astronauts consists of carrying out strength, aerobic and general conditioning, employing the principles of periodization. Exercise programs are prescribed to the astronauts to account for their individual fitness levels, planned mission-specific tasks, areas of concern, and travel schedules. Additionally, astronauts receive instruction on how to operate CMS exercise hardware and receive training for microgravity-specific conditions. For example, astronauts are scheduled training sessions for the International Space Station (ISS) treadmill (TVIS) and cycle ergometer (CEVIS), as well as the Advanced Resistive Exercise Device (ARED). In-flight programs are designed to maintain or even improve the astronauts pre-flight levels of fitness, bone health, muscle strength, power and aerobic capacity. In-flight countermeasure sessions are scheduled in 2.5 h blocks, six days a week, which includes 1.5 h for resistive training and 1 h for aerobic exercise. CONCLUSIONS: Crewmembers reported the need for more scheduled time for preflight training. During flight, crewmembers have indicated that the in-flight exercise is sufficient, but would like more reliable and capable hardware.

  20. Bulk Leisure--Problem or Blessing?

    ERIC Educational Resources Information Center

    Beland, Robert M.

    1983-01-01

    With an increasing number of the nation's work force experiencing "bulk leisure" time because of new work scheduling procedures, parks and recreation offices are encouraged to examine their program scheduling and content. (JM)

  1. Geostationary Operational Environmental Satellites (GOES): R series hyperspectral environmental suite (HES) overview

    NASA Astrophysics Data System (ADS)

    Martin, Gene; Criscione, Joseph C.; Cauffman, Sandra A.; Davis, Martin A.

    2004-11-01

    The Hyperspectral Environmental Suite (HES) instrument is currently under development by the NASA GOES-R Project team within the framework of the GOES Program to fulfill the future needs and requirements of the National Environmental Satellite, Data, and Information Service (NESDIS) Office. As part of the GOES-R instrument complement, HES will provide measurements of the traditional temperature and water vapor vertical profiles with higher accuracy and vertical resolution than obtained through current sounder technologies. HES will provide measurements of the properties of the shelf and coastal waters and back up imaging (at in-situ resolution) for the GOES-R Advanced Baseline Imager (ABI). The HES team is forging the future of remote environmental monitoring with the development of an operational instrument with high temporal, spatial and spectral-resolution and broad hemispheric coverage. The HES development vision includes threshold and goal requirements that encompass potential system solutions. The HES team has defined tasks for the instrument(s) that include a threshold functional complement of Disk Sounding (DS), Severe Weather/Mesoscale Sounding (SW/M), and Shelf and Coastal Waters imaging (CW) and a goal functional complement of Open Ocean (OO) imaging, and back up imaging (at in-situ resolution) for the GOES-R Advanced Baseline Imager (ABI). To achieve the best-value procurement, the GOES-R Project has base-lined a two-phase procurement approach to the HES design and development; a Formulation/study phase and an instrument Implementation phase. During Formulation, currently slated for the FY04-05 timeframe, the developing team(s) will perform Systems Requirements Analysis and evaluation, System Trade and Requirements Baseline Studies, Risk Assessment and Mitigation Strategy and complete a Preliminary Conceptual Design of the HES instrument. The results of the formulation phase will be leveraged to achieve an effective and efficient system solution during the Implementation Phase scheduled to begin FY05 for a resultant FY12 launch. The magnitude of complexity of the HES development requires an appreciation of the technologies required to achieve the functional objectives. To this end, the GOES-R project team is making available all NASA developed technologies to potential HES vendors, including, the NASA New Millennium Program"s (NMP) Earth Observing-3, Geostationary Imaging Fourier Transform Spectrometer (GIFTS) instrument developed technologies, as applicable. It is anticipated that the instrument(s) meeting the HES requirements will be either a dispersive spectrometer or an interferometric spectrometer or perhaps a combination. No instrument configuration is preferred or favored by the Government. This paper outlines the HES development plan; including an overview of current requirements, existing partnerships and the GOES-R project methodologies to achieve the advanced functional objectives of the GOES Program partnership.

  2. A Dynamic Scheduling Method of Earth-Observing Satellites by Employing Rolling Horizon Strategy

    PubMed Central

    Dishan, Qiu; Chuan, He; Jin, Liu; Manhao, Ma

    2013-01-01

    Focused on the dynamic scheduling problem for earth-observing satellites (EOS), an integer programming model is constructed after analyzing the main constraints. The rolling horizon (RH) strategy is proposed according to the independent arriving time and deadline of the imaging tasks. This strategy is designed with a mixed triggering mode composed of periodical triggering and event triggering, and the scheduling horizon is decomposed into a series of static scheduling intervals. By optimizing the scheduling schemes in each interval, the dynamic scheduling of EOS is realized. We also propose three dynamic scheduling algorithms by the combination of the RH strategy and various heuristic algorithms. Finally, the scheduling results of different algorithms are compared and the presented methods in this paper are demonstrated to be efficient by extensive experiments. PMID:23690742

  3. A dynamic scheduling method of Earth-observing satellites by employing rolling horizon strategy.

    PubMed

    Dishan, Qiu; Chuan, He; Jin, Liu; Manhao, Ma

    2013-01-01

    Focused on the dynamic scheduling problem for earth-observing satellites (EOS), an integer programming model is constructed after analyzing the main constraints. The rolling horizon (RH) strategy is proposed according to the independent arriving time and deadline of the imaging tasks. This strategy is designed with a mixed triggering mode composed of periodical triggering and event triggering, and the scheduling horizon is decomposed into a series of static scheduling intervals. By optimizing the scheduling schemes in each interval, the dynamic scheduling of EOS is realized. We also propose three dynamic scheduling algorithms by the combination of the RH strategy and various heuristic algorithms. Finally, the scheduling results of different algorithms are compared and the presented methods in this paper are demonstrated to be efficient by extensive experiments.

  4. Conflicts of Time: Examining School Schedules in Secondary Agricultural Programs

    ERIC Educational Resources Information Center

    Epps, Rebekah B.; Adams, Randy J.; Vincent, Stacy K.

    2015-01-01

    The purpose of this study was to examine how school schedules can or cannot be justified through the perspective of student performance on state core content assessments and occupational skills standards assessments. This study utilized the Theory of Power in Education when considering school schedules as a means to student success on core content…

  5. A Comparison of the DISASTER (Trademark) Scheduling Software with a Simultaneous Scheduling Algorithm for Minimizing Maximum Tardiness in Job Shops

    DTIC Science & Technology

    1993-09-01

    goal ( Heizer , Render , and Stair, 1993:94). Integer Prgronmming. Integer programming is a general purpose approach used to optimally solve job shop...Scheduling," Operations Research Journal. 29, No 4: 646-667 (July-August 1981). Heizer , Jay, Barry Render and Ralph M. Stair, Jr. Production and Operations

  6. Registration Review Schedules

    EPA Pesticide Factsheets

    This schedule indicates plans for completion of risk assessments, proposed interim decisions and interim decisions for pesticides in the Registration Review program, EPA reviews all registered pesticides at least every 15 years as required by FIFRA.

  7. Scheduling language and algorithm development study. Appendix: Study approach and activity summary

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The approach and organization of the study to develop a high level computer programming language and a program library are presented. The algorithm and problem modeling analyses are summarized. The approach used to identify and specify the capabilities required in the basic language is described. Results of the analyses used to define specifications for the scheduling module library are presented.

  8. Heimdall System for MSSS Sensor Tasking

    NASA Astrophysics Data System (ADS)

    Herz, A.; Jones, B.; Herz, E.; George, D.; Axelrad, P.; Gehly, S.

    In Norse Mythology, Heimdall uses his foreknowledge and keen eyesight to keep watch for disaster from his home near the Rainbow Bridge. Orbit Logic and the Colorado Center for Astrodynamics Research (CCAR) at the University of Colorado (CU) have developed the Heimdall System to schedule observations of known and uncharacterized objects and search for new objects from the Maui Space Surveillance Site. Heimdall addresses the current need for automated and optimized SSA sensor tasking driven by factors associated with improved space object catalog maintenance. Orbit Logic and CU developed an initial baseline prototype SSA sensor tasking capability for select sensors at the Maui Space Surveillance Site (MSSS) using STK and STK Scheduler, and then added a new Track Prioritization Component for FiSST-inspired computations for predicted Information Gain and Probability of Detection, and a new SSA-specific Figure-of-Merit (FOM) for optimized SSA sensor tasking. While the baseline prototype addresses automation and some of the multi-sensor tasking optimization, the SSA-improved prototype addresses all of the key elements required for improved tasking leading to enhanced object catalog maintenance. The Heimdall proof-of-concept was demonstrated for MSSS SSA sensor tasking for a 24 hour period to attempt observations of all operational satellites in the unclassified NORAD catalog, observe a small set of high priority GEO targets every 30 minutes, make a sky survey of the GEO belt region accessible to MSSS sensors, and observe particular GEO regions that have a high probability of finding new objects with any excess sensor time. This Heimdall prototype software paves the way for further R&D that will integrate this technology into the MSSS systems for operational scheduling, improve the software's scalability, and further tune and enhance schedule optimization. The Heimdall software for SSA sensor tasking provides greatly improved performance over manual tasking, improved coordinated sensor usage, and tasking schedules driven by catalog improvement goals (reduced overall covariance, etc.). The improved performance also enables more responsive sensor tasking to address external events, newly detected objects, newly detected object activity, and sensor anomalies. Instead of having to wait until the next day's scheduling phase, events can be addressed with new tasking schedules immediately (within seconds or minutes). Perhaps the most important benefit is improved SSA based on an overall improvement to the quality of the space catalog. By driving sensor tasking and scheduling based on predicted Information Gain and other relevant factors, better decisions are made in the application of available sensor resources, leading to an improved catalog and better information about the objects of most interest. The Heimdall software solution provides a configurable, automated system to improve sensor tasking efficiency and responsiveness for SSA applications. The FISST algorithms for Track Prioritization, SSA specific task and resource attributes, Scheduler algorithms, and configurable SSA-specific Figure-of-Merit together provide optimized and tunable scheduling for the Maui Space Surveillance Site and possibly other sites and organizations across the U.S. military and for allies around the world.

  9. Microcomputer Scheduling of Reference Desk Staff.

    ERIC Educational Resources Information Center

    Cornick, Donna; Owen, Willy

    1988-01-01

    Presents a model that can accommodate staff preferences when determining a reference desk schedule using a microcomputer, the Lotus 1-2-3 spreadsheet software, and the linear programing software LP83. (eight references) (MES)

  10. Time-based air traffic management using expert systems

    NASA Technical Reports Server (NTRS)

    Tobias, L.; Scoggins, J. L.

    1986-01-01

    A prototype expert system has been developed for the time scheduling of aircraft into the terminal area. The three functions of the air-traffic-control schedule advisor are as follows: (1) for each new arrival, it develops an admisible flight plan for that aircraft; (2) as the aircraft progresses through the terminal area, it monitors deviations from the aircraft's flight plan and provides advisories to return the aircraft to its assigned schedule; and (3) if major disruptions such as missed approaches occur, it develops a revised plan. The advisor is operational on a Symbolics 3600, and is programmed in MRS (a logic programming language), Lisp, and Fortran.

  11. Time-based air traffic management using expert systems

    NASA Technical Reports Server (NTRS)

    Tobias, L.; Scoggins, J. L.

    1986-01-01

    A prototype expert system was developed for the time scheduling of aircraft into the terminal area. The three functions of the air traffic control schedule advisor are as follows: first, for each new arrival, it develops an admissible flight plan for that aircraft. Second, as the aircraft progresses through the terminal area, it monitors deviations from the flight plan and provides advisories to return the aircraft to its assigned schedule. Third, if major disruptions such as missed approaches occur, it develops a revised plan. The advisor is operational on a Symbolics 3600, and is programed in MRS (a logic programming language), Lisp, and FORTRAN.

  12. Increasing Pediatricians' Smoking Cessation Promotion and Knowledge of the Smoking Cessation Trust.

    PubMed

    Thomas, Katharine E H; Kisely, Steve; Urrego, Fernando

    2017-05-01

    The link between second hand smoke exposure (SHSe) and health issues in children has been well established. The objective of this study was to determine if a short intervention implemented among pediatricians promotes improvement in the promotion of smoking cessation to caregivers and increase pediatricians' awareness of the Smoking Cessation Trust (SCT). Pediatricians from 6 clinics were randomly assigned to the control or intervention group. All pediatricians received a survey to assess baseline knowledge, confidence and behaviors in smoking cessation promotion and utilization of the SCT. Pediatricians in intervention group received an educational lecture delivered by a physician. Two months post intervention, pediatricians in the control and intervention group received a survey to assess changes from baseline. Out of 36 general pediatricians, 27 completed the surveys for use in the analysis of this study (75%). Intervention group made more referrals to the SCT, compared to controls (p=0.048) and to baseline (p=0.0065). Pediatricians in the intervention group were more confident in recommending the use of NRT (0.040) and schedule a follow up to discuss smoking cessation (p=0.029) after the intervention. The intervention group was more likely to refer caregivers to smoking cessation programs (p=0.027), discuss a child's health risk from SHSe (0.031) and recommending the use of NRT to help quit (p=0.047) post intervention. The results from this study indicate that a short intervention can increase confidence and behavior in various parameters of smoking cessation promotion and significantly improve the rate in which pediatricians refer smoking caregivers to the SCT.

  13. Are preference and resistance to change convergent expressions of stimulus value?

    PubMed

    Podlesnik, Christopher A; Jimenez-Gomez, Corina; Shahan, Timothy A

    2013-07-01

    Behavioral momentum theory asserts that preference and relative resistance to disruption depend on reinforcement rates and provide converging expressions of the conditioned value of discriminative stimuli. However, preference and resistance to disruption diverge when assessing preference during brief extinction probes. We expanded upon this opposing relation by arranging target stimuli signaling equal variable-interval schedules across components of a multiple schedule. We paired one target stimulus with a richer reinforced alternative and the other with a leaner alternative. Furthermore, we varied reinforcement rates for the paired alternatives to assess the effects of manipulating relative conditioned value on preference and resistance to disruption by presession feeding, intercomponent food, and extinction. We replicated the opposing relation between preference and resistance to disruption but varying reinforcement rates for the paired alternatives did not systematically affect preference or resistance to disruption beyond levels observed in our initial condition. Importantly, we found that only preference between the target stimuli was related to relative baseline response rates in the presence of those stimuli. These findings suggest that preference during extinction probes might reveal more about baseline response rates between concurrently available alternatives than relative conditioned value. Resistance to disruption, conversely, appears to better reflect conditioned value because it is less confounded with baseline response rates and is a function of all sources of reinforcement obtained in the presence of a stimulus context. © Society for the Experimental Analysis of Behavior.

  14. 75 FR 73169 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ...This final rule with comment period addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It finalizes the calendar year (CY) 2010 interim relative value units (RVUs) and issues interim RVUs for new and revised procedure codes for CY 2011. It also addresses, implements, or discusses certain provisions of both the Affordable Care Act (ACA) and the Medicare Improvements for Patients and Providers Act of 2008 (MIPPA). In addition, this final rule with comment period discusses payments under the Ambulance Fee Schedule (AFS), the Ambulatory Surgical Center (ASC) payment system, and the Clinical Laboratory Fee Schedule (CLFS), payments to end-stage renal disease (ESRD) facilities, and payments for Part B drugs. Finally, this final rule with comment period also includes a discussion regarding the Chiropractic Services Demonstration program, the Competitive Bidding Program for durable medical equipment, prosthetics, orthotics, and supplies (CBP DMEPOS), and provider and supplier enrollment issues associated with air ambulances.

  15. Shift scheduling model considering workload and worker’s preference for security department

    NASA Astrophysics Data System (ADS)

    Herawati, A.; Yuniartha, D. R.; Purnama, I. L. I.; Dewi, LT

    2018-04-01

    Security department operates for 24 hours and applies shift scheduling to organize its workers as well as in hotel industry. This research has been conducted to develop shift scheduling model considering the workers physical workload using rating of perceived exertion (RPE) Borg’s Scale and workers’ preference to accommodate schedule flexibility. The mathematic model is developed in integer linear programming and results optimal solution for simple problem. Resulting shift schedule of the developed model has equally distribution shift allocation among workers to balance the physical workload and give flexibility for workers in working hours arrangement.

  16. Cost-Effectiveness Analysis of the Spanish Renal Replacement Therapy Program

    PubMed Central

    Villa, Guillermo; Fernández–Ortiz, Lucía; Cuervo, Jesús; Rebollo, Pablo; Selgas, Rafael; González, Teresa; Arrieta, Javier

    2012-01-01

    ♦ Background: We undertook a cost-effectiveness analysis of the Spanish Renal Replacement Therapy (RRT) program for end-stage renal disease patients from a societal perspective. The current Spanish situation was compared with several hypothetical scenarios. ♦ Methods: A Markov chain model was used as a foundation for simulations of the Spanish RRT program in three temporal horizons (5, 10, and 15 years). The current situation (scenario 1) was compared with three different scenarios: increased proportion of overall scheduled (planned) incident patients (scenario 2); constant proportion of overall scheduled incident patients, but increased proportion of scheduled incident patients on peritoneal dialysis (PD), resulting in a lower proportion of scheduled incident patients on hemodialysis (HD) (scenario 3); and increased overall proportion of scheduled incident patients together with increased scheduled incidence of patients on PD (scenario 4). ♦ Results: The incremental cost-effectiveness ratios (ICERs) of scenarios 2, 3, and 4, when compared with scenario 1, were estimated to be, respectively, –€83 150, –€354 977, and –€235 886 per incremental quality-adjusted life year (ΔQALY), evidencing both moderate cost savings and slight effectiveness gains. The net health benefits that would accrue to society were estimated to be, respectively, 0.0045, 0.0211, and 0.0219 ΔQALYs considering a willingness-to-pay threshold of €35 000/ΔQALY. ♦ Conclusions: Scenario 1, the current Spanish situation, was dominated by all the proposed scenarios. Interestingly, scenarios 3 and 4 showed the best results in terms of cost-effectiveness. From a cost-effectiveness perspective, an increase in the overall scheduled incidence of RRT, and particularly that of PD, should be promoted. PMID:21965620

  17. Advanced Technology System Scheduling Governance Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ang, Jim; Carnes, Brian; Hoang, Thuc

    In the fall of 2005, the Advanced Simulation and Computing (ASC) Program appointed a team to formulate a governance model for allocating resources and scheduling the stockpile stewardship workload on ASC capability systems. This update to the original document takes into account the new technical challenges and roles for advanced technology (AT) systems and the new ASC Program workload categories that must be supported. The goal of this updated model is to effectively allocate and schedule AT computing resources among all three National Nuclear Security Administration (NNSA) laboratories for weapons deliverables that merit priority on this class of resource. Themore » process outlined below describes how proposed work can be evaluated and approved for resource allocations while preserving high effective utilization of the systems. This approach will provide the broadest possible benefit to the Stockpile Stewardship Program (SSP).« less

  18. A New Baseline for Chronic Fatigue: Why Measuring Flight Time Is the Wrong Approach

    DTIC Science & Technology

    2013-04-01

    crew is shown to report fully or nearly fully effective for the following sortie despite their harrowing schedule. (Table 3) Flyawake Results...Journal of Psychology, July 1948: 13. Svan, Jennifer H. "Air Force Changes Deployments Lengths for Some 42,000 Airmen." Stars and Stripes, September 16

  19. Nuclear Weapons: NNSA Needs to Establish a Cost and Schedule Baseline for Manufacturing a Critical Nuclear Weapon Component

    DTIC Science & Technology

    2008-05-01

    building up to and beyond the 2013 time frame. However, in October 2007, the Defense Nuclear Facilities Safety Board, which monitors safety...manufacturing. They said that NNSA is still working through this process with the Defense Nuclear Facilities Safety Board. Processing of waste

  20. Enhanced Case Management versus Substance Abuse Treatment Alone among Substance Abusers with Depression

    ERIC Educational Resources Information Center

    Striley, Catherine W.; Nattala, Prasanthi; Ben Abdallah, Arbi; Dennis, Michael L.; Cottler, Linda B.

    2013-01-01

    This pilot study evaluated the effectiveness of enhanced case management for substance abusers with comorbid major depression, which was an integrated approach to care. One hundred and 20 participants admitted to drug treatment who also met Computerized Diagnostic Interview Schedule criteria for major depression at baseline were randomized to…

  1. 75 FR 29527 - Combined Notice Of Filings # 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ... Sales Tariff to be effective 5/14/2010. Filed Date: 05/14/2010. Accession Number: 20100514-5039. Comment...: Baseline filing of Consolidated Edison Energy, Inc. MBR to be effective 5/14/2010. Filed Date: 05/14/2010.... Description: ISO New England Inc. submits its Capital Projects Report and schedule of the unamortized costs of...

  2. Measuring Resistance to Change at the Within-Session Level

    ERIC Educational Resources Information Center

    Tonneau, Francois; Rios, Americo; Cabrera, Felipe

    2006-01-01

    Resistance to change is often studied by measuring response rate in various components of a multiple schedule. Response rate in each component is normalized (that is, divided by its baseline level) and then log-transformed. Differential resistance to change is demonstrated if the normalized, log-transformed response rate in one component decreases…

  3. Naps promote flexible memory retrieval in 12-month-old infants.

    PubMed

    Konrad, Carolin; Seehagen, Sabine; Schneider, Silvia; Herbert, Jane S

    2016-11-01

    Flexibility in applying existing knowledge to similar cues is a corner stone of memory development in infants. Here, we examine the effect of sleep on the flexibility of memory retrieval using a deferred imitation paradigm. Forty-eight 12-month-old infants were randomly assigned to either a nap or a no-nap demonstration condition (scheduled around their natural daytime sleep schedule) or to a baseline control condition. In the demonstration conditions, infants watched an experimenter perform three target actions on a hand puppet. Immediately afterwards, infants were allowed to practice the target actions three times. In a test session 4-hr later, infants were given the opportunity to reproduce the actions with a novel hand puppet differing in color from the puppet used during the demonstration session. Only infants in the nap-condition performed significantly more target actions than infants in the baseline control condition. Furthermore, they were faster to carry out the first target action than infants in the no-nap condition. We conclude that sleep had a facilitative effect on infants' flexibility of memory retrieval. © 2016 Wiley Periodicals, Inc.

  4. Production Planning and Planting Pattern Scheduling Information System for Horticulture

    NASA Astrophysics Data System (ADS)

    Vitadiar, Tanhella Zein; Farikhin; Surarso, Bayu

    2018-02-01

    This paper present the production of planning and planting pattern scheduling faced by horticulture farmer using two methods. Fuzzy time series method use to predict demand on based on sales amount, while linear programming is used to assist horticulture farmers in making production planning decisions and determining the schedule of cropping patterns in accordance with demand predictions of the fuzzy time series method, variable use in this paper is size of areas, production advantage, amount of seeds and age of the plants. This research result production planning and planting patterns scheduling information system with the output is recommendations planting schedule, harvest schedule and the number of seeds will be plant.

  5. Parallel scheduling of recursively defined arrays

    NASA Technical Reports Server (NTRS)

    Myers, T. J.; Gokhale, M. B.

    1986-01-01

    A new method of automatic generation of concurrent programs which constructs arrays defined by sets of recursive equations is described. It is assumed that the time of computation of an array element is a linear combination of its indices, and integer programming is used to seek a succession of hyperplanes along which array elements can be computed concurrently. The method can be used to schedule equations involving variable length dependency vectors and mutually recursive arrays. Portions of the work reported here have been implemented in the PS automatic program generation system.

  6. NASA management of the Space Shuttle Program

    NASA Technical Reports Server (NTRS)

    Peters, F.

    1975-01-01

    The management system and management technology described have been developed to meet stringent cost and schedule constraints of the Space Shuttle Program. Management of resources available to this program requires control and motivation of a large number of efficient creative personnel trained in various technical specialties. This must be done while keeping track of numerous parallel, yet interdependent activities involving different functions, organizations, and products all moving together in accordance with intricate plans for budgets, schedules, performance, and interaction. Some techniques developed to identify problems at an early stage and seek immediate solutions are examined.

  7. Space transfer vehicle concepts and requirements study. Volume 2, book 4: Integrated advanced technology development

    NASA Technical Reports Server (NTRS)

    Weber, Gary A.

    1991-01-01

    The Space Transfer Vehicle (STV) program provides both an opportunity and a requirement to increase our upper stage capabilities with the development and applications of new technologies. Issues such as man rating, space basing, reusability, and long lunar surface storage times drive the need for new technology developments and applications. In addition, satisfaction of mission requirements such as lunar cargo delivery capability and lunar landing either require new technology development or can be achieved in a more cost-effective manner with judicious applications of advanced technology. During the STV study, advanced technology development requirements and plans have been addressed by the Technology/Advanced Development Working Group composed of NASA and contractor representatives. This report discusses the results to date of this working group. The first section gives an overview of the technologies that have potential or required applications for the STV and identifies those technologies baselined for the STV. Figures are provided that list the technology categories and show the priority placed on those technology categories for either the space-based or ground-based options. The second section covers the plans and schedules for incorporating the technologies into the STV program.

  8. The NASA Goddard Group's Source Monitoring Database and Program

    NASA Astrophysics Data System (ADS)

    Gipson, John; Le Bail, Karine; Ma, Chopo

    2014-12-01

    Beginning in 2003, the Goddard VLBI group developed a program to purposefully monitor when sources were observed and to increase the observations of ``under-observed'' sources. The heart of the program consists of a MySQL database that keeps track of, on a session-by-session basis: the number of observations that are scheduled for a source, the number of observations that are successfully correlated, and the number of observations that are used in a session. In addition, there is a table that contains the target number of successful sessions over the last twelve months. Initially this table just contained two categories. Sources in the geodetic catalog had a target of 12 sessions/year; the remaining ICRF-1 defining sources had a target of two sessions/year. All other sources did not have a specific target. As the program evolved, different kinds of sources with different observing targets were added. During the scheduling process, the scheduler has the option of automatically selecting N sources which have not met their target. We discuss the history and present some results of this successful program.

  9. 78 FR 48995 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-12

    ...This document corrects technical errors that appeared in the final rule with comment period published in the Federal Register on November 16, 2012, entitled ``Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to-Face Encounters, Elimination of the Requirement for Termination of Non-Random Prepayment Complex Medical Review and Other Revisions to Part B for CY 2013.''

  10. Cost and schedule analytical techniques development

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This contract provided technical services and products to the Marshall Space Flight Center's Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) for the period of 3 Aug. 1991 - 30 Nov. 1994. Accomplishments summarized cover the REDSTAR data base, NASCOM hard copy data base, NASCOM automated data base, NASCOM cost model, complexity generators, program planning, schedules, NASA computer connectivity, other analytical techniques, and special project support.

  11. Constellation Program Life-cycle Cost Analysis Model (LCAM)

    NASA Technical Reports Server (NTRS)

    Prince, Andy; Rose, Heidi; Wood, James

    2008-01-01

    The Constellation Program (CxP) is NASA's effort to replace the Space Shuttle, return humans to the moon, and prepare for a human mission to Mars. The major elements of the Constellation Lunar sortie design reference mission architecture are shown. Unlike the Apollo Program of the 1960's, affordability is a major concern of United States policy makers and NASA management. To measure Constellation affordability, a total ownership cost life-cycle parametric cost estimating capability is required. This capability is being developed by the Constellation Systems Engineering and Integration (SE&I) Directorate, and is called the Lifecycle Cost Analysis Model (LCAM). The requirements for LCAM are based on the need to have a parametric estimating capability in order to do top-level program analysis, evaluate design alternatives, and explore options for future systems. By estimating the total cost of ownership within the context of the planned Constellation budget, LCAM can provide Program and NASA management with the cost data necessary to identify the most affordable alternatives. LCAM is also a key component of the Integrated Program Model (IPM), an SE&I developed capability that combines parametric sizing tools with cost, schedule, and risk models to perform program analysis. LCAM is used in the generation of cost estimates for system level trades and analyses. It draws upon the legacy of previous architecture level cost models, such as the Exploration Systems Mission Directorate (ESMD) Architecture Cost Model (ARCOM) developed for Simulation Based Acquisition (SBA), and ATLAS. LCAM is used to support requirements and design trade studies by calculating changes in cost relative to a baseline option cost. Estimated costs are generally low fidelity to accommodate available input data and available cost estimating relationships (CERs). LCAM is capable of interfacing with the Integrated Program Model to provide the cost estimating capability for that suite of tools.

  12. Signals, resistance to change, and conditioned reinforcement in a multiple schedule.

    PubMed

    Bell, Matthew C; Gomez, Belen E; Kessler, Kira

    2008-06-01

    The effect of signals on resistance to change was evaluated using pigeons responding on a three-component multiple schedule. Each component contained a variable-interval initial link followed by a fixed-time terminal link. One component was an unsignaled-delay schedule, and two were equivalent signaled-delay schedules. After baseline training, resistance to change was assessed through (a) extinction and (b) adding free food to the intercomponent interval. During these tests, the signal stimulus from one of the signaled-delay components (SIG-T) was replaced with the initial-link stimulus from that component, converting it to an unsignaled-delay schedule. That signal stimulus was added to the delay period of the unsignaled-delay component (UNS), converting it to a signaled-delay schedule. The remaining signaled component remained unchanged (SIG-C). Resistance-to-change tests showed removing the signal had a minimal effect on resistance to change in the SIG-T component compared to the unchanged SIG-C component except for one block during free-food testing. Adding the signal to the UNS component significantly increased response rates suggesting that component had low response strength. Interestingly, the direction of the effect was in the opposite direction from what is typically observed. Results are consistent with the conclusion that the signal functioned as a conditioned reinforcer and inconsistent with a generalization-decrement explanation.

  13. Mixed Integer Programming and Heuristic Scheduling for Space Communication Networks

    NASA Technical Reports Server (NTRS)

    Cheung, Kar-Ming; Lee, Charles H.

    2012-01-01

    We developed framework and the mathematical formulation for optimizing communication network using mixed integer programming. The design yields a system that is much smaller, in search space size, when compared to the earlier approach. Our constrained network optimization takes into account the dynamics of link performance within the network along with mission and operation requirements. A unique penalty function is introduced to transform the mixed integer programming into the more manageable problem of searching in a continuous space. The constrained optimization problem was proposed to solve in two stages: first using the heuristic Particle Swarming Optimization algorithm to get a good initial starting point, and then feeding the result into the Sequential Quadratic Programming algorithm to achieve the final optimal schedule. We demonstrate the above planning and scheduling methodology with a scenario of 20 spacecraft and 3 ground stations of a Deep Space Network site. Our approach and framework have been simple and flexible so that problems with larger number of constraints and network can be easily adapted and solved.

  14. Real-Time MENTAT programming language and architecture

    NASA Technical Reports Server (NTRS)

    Grimshaw, Andrew S.; Silberman, Ami; Liu, Jane W. S.

    1989-01-01

    Real-time MENTAT, a programming environment designed to simplify the task of programming real-time applications in distributed and parallel environments, is described. It is based on the same data-driven computation model and object-oriented programming paradigm as MENTAT. It provides an easy-to-use mechanism to exploit parallelism, language constructs for the expression and enforcement of timing constraints, and run-time support for scheduling and exciting real-time programs. The real-time MENTAT programming language is an extended C++. The extensions are added to facilitate automatic detection of data flow and generation of data flow graphs, to express the timing constraints of individual granules of computation, and to provide scheduling directives for the runtime system. A high-level view of the real-time MENTAT system architecture and programming language constructs is provided.

  15. Testing Maternal Depression and Attachment Style as Moderators of Early Head Start's Effects on Parenting

    PubMed Central

    Berlin, Lisa J.; Whiteside-Mansell, Leanne; Roggman, Lori A.; Green, Beth L.; Robinson, JoAnn; Spieker, Susan

    2010-01-01

    This study examined maternal depression, attachment avoidance, and attachment anxiety as moderators of Early Head Start's effects on four parenting outcomes assessed at age 3. Participants (N = 947) were drawn from six sites of the Early Head Start National Research and Evaluation Project, a multi-site randomized trial. Findings suggest more positive program effects for mothers with less initial attachment avoidance or attachment anxiety. First, baseline attachment avoidance moderated EHS program effects on observed maternal supportiveness, such that program mothers with lower baseline attachment avoidance were rated as more supportive of their 3-year-olds than program mothers with higher baseline attachment avoidance. Second, program effects on spanking varied depending on mothers’ baseline attachment anxiety. PMID:21240694

  16. Testing maternal depression and attachment style as moderators of Early Head Start's effects on parenting.

    PubMed

    Berlin, Lisa J; Whiteside-Mansell, Leanne; Roggman, Lori A; Green, Beth L; Robinson, JoAnn; Spieker, Susan

    2011-01-01

    This study examined maternal depression, attachment avoidance, and attachment anxiety as moderators of Early Head Start's effects on four parenting outcomes assessed at age three. Participants (N = 947) were drawn from six sites of the Early Head Start National Research and Evaluation Project, a multi-site randomized trial. Findings suggest more positive program effects for mothers with less initial attachment avoidance or attachment anxiety. First, baseline attachment avoidance moderated Early Head Start program effects on observed maternal supportiveness, such that program mothers with lower baseline attachment avoidance were rated as more supportive of their three-year-olds than program mothers with higher baseline attachment avoidance. Second, program effects on spanking varied depending on mothers' baseline attachment anxiety.

  17. 40 CFR 256.27 - Recommendation for schedules leading to compliance with the prohibition of open dumping.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Solid Waste Disposal Programs § 256.27 Recommendation for schedules leading...

  18. 40 CFR 256.26 - Requirement for schedules leading to compliance with the prohibition of open dumping.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Solid Waste Disposal Programs § 256.26 Requirement for schedules leading to...

  19. 40 CFR 256.26 - Requirement for schedules leading to compliance with the prohibition of open dumping.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Solid Waste Disposal Programs § 256.26 Requirement for schedules leading to...

  20. 40 CFR 256.27 - Recommendation for schedules leading to compliance with the prohibition of open dumping.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Solid Waste Disposal Programs § 256.27 Recommendation for schedules leading...

  1. A cloud-based electronic medical record for scheduling, tracking, and documenting examinations and treatment of retinopathy of prematurity.

    PubMed

    Arnold, Robert W; Jacob, Jack; Matrix, Zinnia

    2012-01-01

    Screening by neonatologists and staging by ophthalmologists is a cost-effective intervention, but inadvertent missed examinations create a high liability. Paper tracking, bedside schedule reminders, and a computer scheduling and reminder program were compared for speed of input and retrospective missed examination rate. A neonatal intensive care unit (NICU) process was then programmed for cloud-based distribution for inpatient and outpatient retinopathy of prematurity monitoring. Over 11 years, 367 premature infants in one NICU were prospectively monitored. The initial paper system missed 11% of potential examinations, the Windows server-based system missed 2%, and the current cloud-based system missed 0% of potential inpatient and outpatient examinations. Computer input of examinations took the same or less time than paper recording. A computer application with a deliberate NICU process improved the proportion of eligible neonates getting their scheduled eye examinations in a timely manner. Copyright 2012, SLACK Incorporated.

  2. Swift and Certain, Proportionate and Consistent: Key Values of Urine Drug Test Consequences for Probationers.

    PubMed

    Cadwallader, Amy B

    2017-09-01

    Traditionally, urine drug testing (UDT) in the correctional population (both prison and community corrections) has been infrequent, is scheduled, and has a high possibility of delayed results. Of practical relevance is that scheduled testing is ineffective for identifying drug misuse. Of ethical relevance is that consequences of positive scheduled tests can be unpredictable-in the form of overly severe punishment or a lack of treatment options-and that the scheduled testing paradigm is a poor way to change behaviors. More innovative programs now use a UDT paradigm with more frequent, random testing providing rapid results and certain, swift consequences and addiction treatment when warranted or requested. Studies have shown these new programs-the foundation of which is frequent, random UDTs-to significantly reduce drug use, criminal recidivism, and incarceration. © 2017 American Medical Association. All Rights Reserved.

  3. Multi-layer service function chaining scheduling based on auxiliary graph in IP over optical network

    NASA Astrophysics Data System (ADS)

    Li, Yixuan; Li, Hui; Liu, Yuze; Ji, Yuefeng

    2017-10-01

    Software Defined Optical Network (SDON) can be considered as extension of Software Defined Network (SDN) in optical networks. SDON offers a unified control plane and makes optical network an intelligent transport network with dynamic flexibility and service adaptability. For this reason, a comprehensive optical transmission service, able to achieve service differentiation all the way down to the optical transport layer, can be provided to service function chaining (SFC). IP over optical network, as a promising networking architecture to interconnect data centers, is the most widely used scenarios of SFC. In this paper, we offer a flexible and dynamic resource allocation method for diverse SFC service requests in the IP over optical network. To do so, we firstly propose the concept of optical service function (OSF) and a multi-layer SFC model. OSF represents the comprehensive optical transmission service (e.g., multicast, low latency, quality of service, etc.), which can be achieved in multi-layer SFC model. OSF can also be considered as a special SF. Secondly, we design a resource allocation algorithm, which we call OSF-oriented optical service scheduling algorithm. It is able to address multi-layer SFC optical service scheduling and provide comprehensive optical transmission service, while meeting multiple optical transmission requirements (e.g., bandwidth, latency, availability). Moreover, the algorithm exploits the concept of Auxiliary Graph. Finally, we compare our algorithm with the Baseline algorithm in simulation. And simulation results show that our algorithm achieves superior performance than Baseline algorithm in low traffic load condition.

  4. Simulation of Twin Telescopes at Onsala and Wettzell for the VLBI Global Observing System

    NASA Astrophysics Data System (ADS)

    Schönberger, Caroline; Gnilsen, Paul; Böhm, Johannes; Haas, Rüdiger

    2015-04-01

    The VLBI2010 committee of the International VLBI Service for Geodesy and Astrometry (IVS) developed a concept to achieve an improvement of the accuracy of geodetic Very Long Baseline Interferometry (VLBI) to 1 mm for station positions and 0.1 mm/yr for station velocities. This so-called VLBI2010 concept includes broadband observations with fast slewing telescopes and proposes twin telescopes to improve the handling of atmospheric turbulence that has been identified as a limiting factor for geodetic VLBI. There are several VLBI sites that have projects to install a Twin Telescope. The Wettzell Twin Telescope in Germany has already been constructed, and Twin Telescopes will be installed in the coming years at Onsala (Sweden), Ny-Ålesund (Spitsbergen, Norway) and Kazan (Russia). In this study, the Vienna VLBI Software (VieVS) is used to schedule and simulate a global VLBI network following the example of the CONT11 campaign, with and without the Twin Telescopes in Onsala and Wettzell. Different scheduling approaches (e.g., source-based scheduling, Twin Telescope observing in multidirectional mode, Twin Telescopes in continuous mode) were compared by evaluating the numbers of observations and scans as well as baseline length repeatabilities, station positions, Earth orientation parameters, atmospheric parameters and clock estimates. Comparison of the results show an improvement in estimated parameters with Twin Telescopes, especially with the Onsala Twin Telescope in a continuous observing mode and a strategy with four sources observed simultaneously.

  5. Adolescent Substance Use Following Participation in a Universal Drug Prevention Program: Examining Relationships with Program Recall and Baseline Use Status

    PubMed Central

    Bavarian, Niloofar; Duncan, Robert; Lewis, Kendra M.; Miao, Alicia; Washburn, Isaac J.

    2014-01-01

    Background We examined whether adolescents receiving a universal, school-based, drug-prevention program in grade 7 varied, by student profile, in substance use behaviors post-program implementation. Profiles were a function of recall of program receipt and substance use at baseline. Methods We analyzed data from the Adolescent Substance Abuse Prevention Study, a large, geographically diverse, longitudinal school-based cluster-randomized controlled trial of the Take Charge of Your Life drug-prevention program. Profiles were created using self-reported substance use (pre-intervention) and program recall (post-intervention) at Grade 7. We first examined characteristics of each of the four profiles of treatment students who varied by program recall and baseline substance use. Using multilevel logistic regression analyses, we examined differences in the odds of substance use (alcohol, tobacco, and marijuana) among student profiles at the six additional study waves (Time 2 (Grade 7) through Time 7 (Grade 11)). Results Pearson’s chi-square tests showed sample characteristics varied by student profile. Multilevel logistic regression results were consistent across all examined substance use behaviors at all time points. Namely, as compared to students who had no baseline substance use and had program recall (No Use, Recall), each of the remaining three profiles (No Use, No Recall; Use, Recall; Use, No Recall) were more likely to engage in substance use. Post-hoc analyses showed that for the two sub-profiles of baseline substance users, there were only two observed, and inconsistent, differences in the odds of subsequent substance use by recall status. Conclusions Findings suggest that for students who were not baseline substance users, program recall significantly decreased the likelihood of subsequent substance use. For students who were baseline substance users, program recall did not generally influence subsequent substance use. Implications for school-based drug prevention programs are discussed. PMID:25148566

  6. Adolescent Substance Use Following Participation in a Universal Drug Prevention Program: Examining Relationships With Program Recall and Baseline Use Status.

    PubMed

    Bavarian, Niloofar; Duncan, Robert; Lewis, Kendra M; Miao, Alicia; Washburn, Isaac J

    2015-01-01

    The study examined whether adolescents receiving a universal, school based, drug prevention program in Grade 7 varied, by student profile, in substance use behaviors post program implementation. Profiles were a function of recall of program receipt and substance use at baseline. A secondary analysis was conducted on data from the Adolescent Substance Abuse Prevention Study, a large, geographically diverse, longitudinal school-based cluster-randomized controlled trial of the Take Charge of Your Life drug prevention program. Profiles were created using self-reported substance use (preintervention) and program recall (postintervention) at Grade 7. First, characteristics of each of the 4 profiles of treatment students who varied by program recall and baseline substance use were explored. Then, multilevel logistic regression analyses were used to examine differences in the odds of substance use (alcohol, tobacco, and marijuana) among student profiles at the 6 additional study waves (Time 2 [Grade 7] through Time 7 [Grade 11]). Pearson's chi-square tests showed sample characteristics varied by student profile. Multilevel logistic regression results were consistent across all examined substance use behaviors at all time points. Namely, as compared with students who had no baseline substance use and had program recall (No Use, Recall), each of the remaining 3 profiles (No Use, No Recall; Use, Recall; Use, No Recall) were more likely to engage in substance use. Post hoc analyses showed that for the 2 subprofiles of baseline substance users, there were only 2 observed, and inconsistent, differences in the odds of subsequent substance use by recall status. Findings suggest that for students who were not baseline substance users, program recall significantly decreased the likelihood of subsequent substance use. For students who were baseline substance users, program recall did not generally influence subsequent substance use. Implications for school-based drug prevention programs are discussed.

  7. From policy to practice: strategies to meet physical activity standards in YMCA afterschool programs.

    PubMed

    Beets, Michael W; Weaver, Robert G; Moore, Justin B; Turner-McGrievy, Gabriel; Pate, Russell R; Webster, Collin; Beighle, Aaron

    2014-03-01

    In 2011, the U.S. Young Men's Christian Association (YMCA) adopted activity standards recommending that afterschool programs (ASPs) ensure all children engage in a minimum of 30 minutes of moderate to vigorous physical activity (MVPA) daily during the ASP. ASPs decide how to accomplish this standard, for which few effective strategies exist. To evaluate strategies designed to help ASPs meet the MVPA standard. Single group intervention with pretest and three follow-up measures repeated-cross-sectional design with a subsample cohort. Four large-scale YMCA ASPs, serving approximately 500 children each day. Community-based participatory development of strategies focused on modification of program schedules, professional development training, and weekly checklists to evaluate activity opportunities. Accelerometry-derived MVPA classified as meet or fail-to-meet the 30 minutes' MVPA/day standard collected over a minimum of 4 nonconsecutive days at baseline (fall 2011) and three follow-up assessments (spring 2012, fall 2012, spring 2013). Random intercept logistic regression models evaluated the probability of meeting the standard for boys and girls, separately (analyzed summer 2013). A total of 895 children (aged 5-12 years, 48.4% girls) representing 3654 daily measures were collected across the four assessments. The percentage of girls and boys meeting the MVPA standard at baseline was 13.3% and 28.0%, respectively. By spring 2013, this increased to 29.3% and 49.6%. These changes represented an increase in the odds of meeting the 30 minutes' MVPA/day standard by 1.5 (95% CI=1.1, 2.0) and 2.4 (95% CI=1.2, 4.8) for girls and boys, respectively. The strategies developed herein represent an effective approach to enhancing current practice within YMCA ASPs to achieve existing MVPA standards. Additional work is necessary to evaluate the scalability of the strategies in a larger sample of ASPs. © 2014 American Journal of Preventive Medicine Published by American Journal of Preventive Medicine All rights reserved.

  8. Software Schedules Missions, Aids Project Management

    NASA Technical Reports Server (NTRS)

    2008-01-01

    NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.

  9. Static Schedulers for Embedded Real-Time Systems

    DTIC Science & Technology

    1989-12-01

    Because of the need for having efficient scheduling algorithms in large scale real time systems , software engineers put a lot of effort on developing...provide static schedulers for he Embedded Real Time Systems with single processor using Ada programming language. The independent nonpreemptable...support the Computer Aided Rapid Prototyping for Embedded Real Time Systems so that we determine whether the system, as designed, meets the required

  10. A Descriptive Outline of a Modular Schedule, Flexible Scheduling Using the Data Processing Method. A Report from Virgin Valley High School, Mesquite, Nevada.

    ERIC Educational Resources Information Center

    Allan, Blaine W., Comp.

    The procedures, forms, and philosophy of the computerized modular scheduling program developed at Virgin Valley High School are outlined. The modular concept is eveloped as a new approach to course structure with explanations, examples, and worksheets included. Examples of courses of study, input information for the data processing center, output…

  11. Optimizing Department of Defense Acquisition Development Test and Evaluation Scheduling

    DTIC Science & Technology

    2015-06-01

    CPM Critical Path Method DOD Department of Defense DT&E development test and evaluation EMD engineering and manufacturing development GAMS...these, including the Program Evaluation Review Technique (PERT), the Critical Path Method ( CPM ), and the resource- constrained project-scheduling...problem (RCPSP). These are of particular interest to this thesis as the current scheduling method uses elements of the PERT/ CPM , and the test

  12. Uplink Packet-Data Scheduling in DS-CDMA Systems

    NASA Astrophysics Data System (ADS)

    Choi, Young Woo; Kim, Seong-Lyun

    In this letter, we consider the uplink packet scheduling for non-real-time data users in a DS-CDMA system. As an effort to jointly optimize throughput and fairness, we formulate a time-span minimization problem incorporating the time-multiplexing of different simultaneous transmission schemes. Based on simple rules, we propose efficient scheduling algorithms and compare them with the optimal solution obtained by linear programming.

  13. Alternative Work Schedules: Many Agencies Do Not Allow Employees the Full Flexibility Permitted by Law. Report to Congressional Committees.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC. General Government Div.

    A review was conducted of the extent to which selected federal agencies are allowing employees to use alternative work schedules (AWS) as authorized by the Federal Employees Flexible and Compressed Work Schedules Act. The statute permits, rather than requires, agencies to institute AWS programs. The study surveyed the policies and practices of 59…

  14. Medicare program; model fee schedule for physicians' services--HCFA. Notice with comment period.

    PubMed

    1990-09-04

    This notice announces and invites comments on a model fee schedule for physicians' services that is required by section 6102 of the Omnibus Budget Reconciliation Act of 1989. The model fee schedule provides very preliminary estimates for some, but not all, services to illustrate the effects of the Medicare physician payment fee schedule that will begin to take effect in January 1992. In accordance with section 6102(f)(11), we are making the model fee schedule available to the public through publication of this notice. Any comments received from the public will be considered carefully, but not specifically addressed in a subsequent proposed rule.

  15. Direct Digital Control of HVAC (Heating, Ventilating, and Air Conditioning).

    DTIC Science & Technology

    1985-01-01

    controller func- tions such as time-of-day, economizer cycles, reset, load shedding, chiller optimization , VAV fan synchronization, and optimum start/stop...control system such as that illustrated in Fig- urc 4. Data on setpoints , reset schedules, and event timing, such as that presented in Figure 6, are...program code (Figure 7). In addition to the control logic, setpoint and other data are readily available. Program logi:, setpoint and schedule data, and

  16. Navy Columbia Class (Ohio Replacement) Ballistic Missile Submarine (SSBN[X]) Program: Background and Issues for Congress

    DTIC Science & Technology

    2016-08-18

    of UK design and manufacture . 12 For more on the arrangement for jointly building Virginia- class boats, see CRS Report RL32418, Navy Virginia (SSN...schedule reduction in Missile Tube Module manufacturing for the OR Class . This schedule reduction, on a potential critical path assembly, would reduce...Navy Columbia Class (Ohio Replacement) Ballistic Missile Submarine (SSBN[X]) Program: Background and Issues for Congress Ronald O’Rourke

  17. Program Scheduling Handbook.

    DTIC Science & Technology

    1980-03-01

    account the outcome of any other task. Each activity must be estimated as a stand-alone entity from the network (statistical indep ndence). The... stress the term program as miiore in dUsive than contract in the WBS and Master Schedule. In this chapter we will present one very usable approach to...questions, not raise them. Use different colored cards to represent the SPO, the contractior, procurement, and any other agency that play, a major role in the

  18. Air Force Civil Engineer, Volume 9, Number 1, Spring 2001

    DTIC Science & Technology

    2001-01-01

    generated some important lessons learned. The Gulf War was a wakeup call for contingency training. When it began, many in CE had never trained on bare...square foot, corrosion control facility at Charleston Air Force Base, S.C. Construction is scheduled for comple- tion in early 2002. The facility is...Rhein Main Transition Program. This program, scheduled for completion in 2005, transfers operational capability from Rhein Main AB to Spangdahlem and

  19. Characterizing and Mitigating Work Time Inflation in Task Parallel Programs

    DOE PAGES

    Olivier, Stephen L.; de Supinski, Bronis R.; Schulz, Martin; ...

    2013-01-01

    Task parallelism raises the level of abstraction in shared memory parallel programming to simplify the development of complex applications. However, task parallel applications can exhibit poor performance due to thread idleness, scheduling overheads, and work time inflation – additional time spent by threads in a multithreaded computation beyond the time required to perform the same work in a sequential computation. We identify the contributions of each factor to lost efficiency in various task parallel OpenMP applications and diagnose the causes of work time inflation in those applications. Increased data access latency can cause significant work time inflation in NUMA systems.more » Our locality framework for task parallel OpenMP programs mitigates this cause of work time inflation. Our extensions to the Qthreads library demonstrate that locality-aware scheduling can improve performance up to 3X compared to the Intel OpenMP task scheduler.« less

  20. Languages for artificial intelligence: Implementing a scheduler in LISP and in Ada

    NASA Technical Reports Server (NTRS)

    Hays, Dan

    1988-01-01

    A prototype scheduler for space experiments originally programmed in a dialect of LISP using some of the more traditional techniques of that language, was recast using an object-oriented LISP, Common LISP with Flavors on the Symbolics. This object-structured version was in turn partially implemented in Ada. The Flavors version showed a decided improvement in both speed of execution and readability of code. The recasting into Ada involved various practical problems of implementation as well as certain challenges of reconceptualization in going from one language to the other. Advantages were realized, however, in greater clarity of the code, especially where more standard flow of control was used. This exercise raised issues about the influence of programming language on the design of flexible and sensitive programs such as schedule planners, and called attention to the importance of factors external to the languages themselves such as system embeddedness, hardware context, and programmer practice.