Science.gov

Sample records for programming planning

  1. Effective family planning programs.

    PubMed

    Rosenfield, A G

    1973-01-01

    Organizational and content features of various national family planning programs are reviewed. The Thai program is cited as an example of a family planning program organized on a massive unipurpose compaign basis. The Korean and Taiwan programs have utilized special field workers while upgrading the general health care network. 3 major problems with family planning programs are: 1) the lack of experience with such programs; 2) lack of commitment at the highest political levels; and 3) medical conservatism. Utilization of all available contraceptive methods instead of reliance on 1 method would improve most programs. Nursing and auxiliary personnel could be trained to take over the work of physicians in family planning programs. This is already being done with IUD insertion and pill prescription in several programs. The postpartum tubal ligation approach has proven effective and should be extended. There is a place in all national programs for both the private and the commercial sectors. Incentives for clinics, personnel, and acceptors might spread family planning more rapidly.

  2. Programs for skyline planning.

    Treesearch

    Ward W. Carson

    1975-01-01

    This paper describes four computer programs for the logging engineer's use in planning log harvesting by skyline systems. One program prepares terrain profile plots from maps mounted on a digitizer; the other programs prepare load-carrying capability and other information for single and multispan standing skylines and single span running skylines. In general, the...

  3. Fermilab Program and Plans

    SciTech Connect

    Denisov, Dmitri

    2014-01-01

    This article is a short summary of the talk presented at 2014 Instrumentation Conference in Novosibirsk about Fermilab's experimental program and future plans. It includes brief description of the P5 long term planning progressing in US as well as discussion of the future accelerators considered at Fermilab.

  4. [Laparoscopic surgery: planning program].

    PubMed

    Sarli, L; Pietra, N; Carreras, F; Longinotti, E

    1992-01-01

    Performing laparoscopic surgery requires an initial training program. A well-planned organization is essential and the surgeon has to become first familiar with the new procedures; the choice of the necessary equipment is the second step. Upkeep of surgical instruments and a careful consideration of legal aspects are the next important steps. Several areas of a planning program are evaluated on the basis of the authors' experience.

  5. Retirement Planning Program.

    ERIC Educational Resources Information Center

    Edison State Community Coll., Piqua, OH.

    This curriculum guide was developed for use in Edison State Community College's (ESCC's) Community Pre-Retirement Training Program. The first of the guide's seven modules provides a brief look at retirement, retirement planning, and the ESCC program. The second module focuses on relationships, considering issues such as communication, finances,…

  6. Planned Programming Pays Dividends

    ERIC Educational Resources Information Center

    Geraldi, Kevin M.

    2008-01-01

    In this article, the author explains that before beginning to create concert programs, it is important that ensemble conductors first develop a long-term curricular plan to which each individual program will contribute. He continues that if an ensemble curriculum is devised so that students make progress over the long term, dynamic growth can take…

  7. Planned Programming Pays Dividends

    ERIC Educational Resources Information Center

    Geraldi, Kevin M.

    2008-01-01

    In this article, the author explains that before beginning to create concert programs, it is important that ensemble conductors first develop a long-term curricular plan to which each individual program will contribute. He continues that if an ensemble curriculum is devised so that students make progress over the long term, dynamic growth can take…

  8. Educational program emergency planning.

    PubMed

    Curtis, Tammy

    2009-01-01

    Tragic university shootings have prompted administrators of higher education institutions to re-evaluate their emergency preparedness plans and take appropriate measures for preventing and responding to emergencies. To review the literature and identify key components needed to prevent shootings at higher education institutions in the United States, and in particular, institutions housing radiologic science programs. Twenty-eight emergency preparedness plans were retrieved electronically and reviewed from a convenience sample of accredited radiologic science programs provided by the Joint Review Committee on Education in Radiologic Technology Web site. The review of the 28 emergency preparedness plans confirmed that most colleges are prepared for basic emergencies, but lack the key components needed to successfully address mass-casualty events. Only 5 (18%) of the 28 institutions addressed policies concerning school shootings.

  9. ESnet Program Plan 1994

    SciTech Connect

    Merola, S.

    1994-11-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

  10. SNS application programming plan.

    SciTech Connect

    Chu, C. M.; Galambos, J. D.; Wei, J.; Allen, C.; McGehee, P. M.; Malitsky, N.

    2001-01-01

    The plan for Spallation Neutron Source accelerator physics application programs is presented. These high level applications involve processing and managing information from the diagnostic instruments, the machine control system, models and static databases and will be used to investigate and control beam behavior. Primary components include an SNS global database and Java-based XAL Application Toolkit. A key element in the SNS application programs is time synchronization of data used in these applications, due to the short pulse (1 ms), pulsed (60 Hz) nature of the device. The data synchronization progress is also presented.

  11. ADS pilot program Plan

    NASA Technical Reports Server (NTRS)

    Clauson, J.; Heuser, J.

    1981-01-01

    The Applications Data Service (ADS) is a system based on an electronic data communications network which will permit scientists to share the data stored in data bases at universities and at government and private installations. It is designed to allow users to readily locate and access high quality, timely data from multiple sources. The ADS Pilot program objectives and the current plans for accomplishing those objectives are described.

  12. Comprehensive Plan for Program Evaluation.

    ERIC Educational Resources Information Center

    Orange County Public Schools, Orlando, FL. Testing and Program Evaluation Section.

    The evaluation plans for the Orange County Public Schools, Orlando, Florida, are summarized. Both instructional programs and support services are assessed, to determine the effectiveness of the programs as well as their value. Evaluations are planned and conducted by the Program Evaluation Section, using the Educational Planning and Resource…

  13. Logistics planning for phased programs.

    NASA Technical Reports Server (NTRS)

    Cook, W. H.

    1973-01-01

    It is pointed out that the proper and early integration of logistics planning into the phased program planning process will drastically reduce these logistics costs. Phased project planning is a phased approach to the planning, approval, and conduct of major research and development activity. A progressive build-up of knowledge of all aspects of the program is provided. Elements of logistics are discussed together with aspects of integrated logistics support, logistics program planning, and logistics activities for phased programs. Continuing logistics support can only be assured if there is a comprehensive sequential listing of all logistics activities tied to the program schedule and a real-time inventory of assets.

  14. NASA program plan

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Major facts are given for NASA'S planned FY-1981 through FY-1985 programs in aeronautics, space science, space and terrestrial applications, energy technology, space technology, space transportation systems, space tracking and data systems, and construction of facilities. Competition and cooperation, reimbursable launchings, schedules and milestones, supporting research and technology, mission coverage, and required funding are considered. Tables and graphs summarize new initiatives, significant events, estimates of space shuttle flights, and major missions in astrophysics, planetary exploration, life sciences, environmental and resources observation, and solar terrestrial investigations. The growth in tracking and data systems capabilities is also depicted.

  15. TWRS safety program plan

    SciTech Connect

    Calderon, L.M., Westinghouse Hanford

    1996-08-01

    Management of Nuclear Safety, Industrial Safety, Industrial Hygiene, and Fire Protection programs, functions, and field support resources for Tank Waste Remediation Systems (TWRS) has, until recently, been centralized in TWRS Safety, under the Emergency, Safety, and Quality organization. Industrial hygiene technician services were also provided to support operational needs related to safety basis compliance. Due to WHC decentralization of safety and reengineering efforts in West Tank Farms, staffing and safety responsibilities have been transferred to the facilities. Under the new structure, safety personnel for TWRS are assigned directly to East Tank Farms, West Tank Farms, and a core Safety Group in TWRS Engineering. The Characterization Project Operations (CPO) safety organization will remain in tact as it currently exists. Personnel assigned to East Tank Farms, West Tank Farms, and CPO will perform facility-specific or project-specific duties and provide field implementation of programs. Those assigned to the core group will focus on activities having a TWRS-wide or programmatic focus. Hanford-wide activities will be the responsibility of the Safety Center of Expertise. In order to ensure an effective and consistent safety program for TWRS under the new organization program functions, goals, organizational structure, roles, responsibilities, and path forward must be clearly established. The purpose of the TWRS Safety Program Plan is to define the overall safety program, responsibilities, relationships, and communication linkages for safety personnel under the new structure. In addition, issues associated with reorganization transition are addressed, including training, project ownership, records management, and dissemination of equipment. For the purpose of this document ``TWRS Safety`` refers to all safety professionals and technicians (Industrial Safety, Industrial Hygiene, Fire Protection, and Nuclear Safety) within the TWRS organization, regardless of their

  16. National transuranic program plan

    SciTech Connect

    Not Available

    1994-10-11

    As a result of various program initiatives, the U.S. generated and will continue to generate waste contaminated with radioactive materials. Because of increased awareness of the risks and special requirements to safely manage long-lived alpha-emitting radionuclides, a new category of radioactive waste, transuranic (TRU) waste, was adopted in 1970. Heads of Field Elements can determine that other alpha-contaminated wastes, peculiar to a specific site, must be managed as transuranic waste{close_quotes}. TRU waste is generated and stored at various DOE sites around the country. In December 1993, the National Transuranic Program Office (NTPO) was established as part of the Carlsbad Area Office (CAO) to integrate and coordinate the diverse organizational elements that contribute to the complex-wide management of TRU waste. Numerous sites with small TRU waste inventories are also part of the national TRU waste system. The majority of TRU waste is also contaminated with hazardous materials and is thus considered mixed waste. Mixed waste must be managed in compliance with all federal, state, and local regulations that are applicable to the radioactive and/or hazardous component of the waste. Each generator site is responsible for the management of its respective waste. Sites must plan and implement programs to minimize, characterize, package, treat, store, ship, and dispose of all TRU waste; construct required waste management facilities and equipment; obtain permits; perform site-specific National Environmental Policy Act (NEPA) analyses; conduct environmental studies; perform laboratory analyses; and certify that waste meets appropriate disposal facility criteria. Due to the toxicity and long half-lives of TRU radionuclides, TRU waste must be disposed in a manner that offers greater confinement than shallow land burial.

  17. Programs for road network planning.

    Treesearch

    Ward W. Carson; Dennis P. Dykstra

    1978-01-01

    This paper describes four computer programs developed to assist logging engineers to plan transportation in a forest. The objective of these programs, to be used together, is to find the shortest path through a transportation network from a point of departure to a destination. Three of the programs use the digitizing and plotting capabilities of a programable desk-top...

  18. LDRD FY 2014 Program Plan

    SciTech Connect

    Anita Gianotto; Dena Tomchak

    2013-08-01

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  19. New Production Reactors Program Plan

    SciTech Connect

    Not Available

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs.

  20. Fiscal year 1987 program plan

    SciTech Connect

    Not Available

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research Development (R D), the organizational interfaces and communication channels for R D and the establishment of procedures for planning, reporting, and budgeting of Operations and R D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years.

  1. Population Growth: Family Planning Programs.

    ERIC Educational Resources Information Center

    Doberenz, Alexander R., Ed.; Taylor, N. Burwell G., Ed.

    These proceedings of the second annual symposium on population growth bring together speeches and panel discussions on family planning programs. Titles of speeches delivered are: Communicating Family Planning (Mrs. Jean Hutchinson); Effects of New York's Abortion Law Change (Dr. Walter Rogers); The Law and Birth Control, Sterilization and Abortion…

  2. Art. Program Planning, Primary, Junior.

    ERIC Educational Resources Information Center

    York Borough Board of Education, Toronto (Ontario).

    Over 20 ideas for planning art programs for grades 1 through 6 are included in this planning guide. Introductory comments stress the individuality of children and caution art teachers not to judge by adult standards and not to direct lessons step-by-step or show how things should be drawn. Outdoor sketching is recommended as a way to develop…

  3. Biomedical programs operations plans

    NASA Technical Reports Server (NTRS)

    Walbrecher, H. F.

    1974-01-01

    Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.

  4. Performance assurance program plan

    SciTech Connect

    Rogers, B.H.

    1997-11-06

    B and W Protec, Inc. (BWP) is responsible for implementing the Performance Assurance Program for the Project Hanford Management Contract (PHMC) in accordance with DOE Order 470.1, Safeguards and Security Program (DOE 1995a). The Performance Assurance Program applies to safeguards and security (SAS) systems and their essential components (equipment, hardware, administrative procedures, Protective Force personnel, and other personnel) in direct support of Category I and H special nuclear material (SNM) protection. Performance assurance includes several Hanford Site activities that conduct performance, acceptance, operability, effectiveness, and validation tests. These activities encompass areas of training, exercises, quality assurance, conduct of operations, total quality management, self assessment, classified matter protection and control, emergency preparedness, and corrective actions tracking and trending. The objective of the Performance Assurance Program is to capture the critical data of the tests, training, etc., in a cost-effective, manageable program that reflects the overall effectiveness of the program while minimizing operational impacts. To aid in achieving this objective, BWP will coordinate the Performance Assurance Program for Fluor Daniel Hanford, Inc. (FDH) and serve as the central point for data collection.

  5. Wildlife monitoring program plan

    NASA Technical Reports Server (NTRS)

    Sebesta, P.; Arno, R.

    1979-01-01

    A plan for integrating the various requirements for wildlife monitoring with modern aerospace technology is presented. This plan is responsive to user needs, recognizes legal requirements, and is based on an evolutionary growth from domestic animals and larger animals to smaller, more scarce and remote species. The basis for animal study selection was made from the 1973 Santa Cruz Summer Study on Wildlife Monitoring. As techniques are developed the monitoring and management tasks will be interfaced with and eventually operated by the user agencies. Field efforts, aircraft and satellites, will be supplemented by laboratory investigations. Sixty percent of the effort will be in hardware research and development (satellite technology, microminiaturization) and the rest for gathering and interpreting data.

  6. Planning and Program Budgeting Workbook.

    ERIC Educational Resources Information Center

    Redburn, Steve; And Others

    The workbook is a training tool designed to make the concept of program planning and budgeting available to small social agencies in a simplified and practical form. It begins with a glossary and an explanation of the Annual Program Budgeting Cycle, the basis for the process described. The first four chapters contain summarized material,…

  7. Hanford Environmental Management Program Plan

    SciTech Connect

    DeFigh-Price, C.

    1989-09-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office (DOE-RL). Westinghouse Hanford Company (WHC) has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as reporting and planning and to facilitate compliance with environmental regulations. This document describes the scope of work funded by this program for Fiscal Year (FY) 1990, presents the prioritized tasks covered, the management structure in place and the assessment allocation methodology used to determine the FY 1990 assessments. 15 refs., 3 figs., 2 tabs.

  8. CEBAF - environmental protection program plan

    SciTech Connect

    1995-10-01

    An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan.

  9. Site Support Program Plan Infrastructure Program

    SciTech Connect

    1995-09-26

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

  10. 20 CFR 632.255 - Program planning.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program planning. 632.255 Section 632.255... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a... with its title IV program. (2) Native American grantees shall use the planning process described...

  11. Head Start Planned Variation Program.

    ERIC Educational Resources Information Center

    Klein, Jenny

    There is little agreement concerning which methods of preschool intervention are most effective. In order to evaluate several approaches to early childhood education, Project Head Start, in conjunction with Project Follow Through, has initiated the Planned Variation program. This year only a pilot project is underway with eight schools…

  12. Agricultural Occupations Programs Planning Guides

    ERIC Educational Resources Information Center

    Stitt, Thomas R.; And Others

    1977-01-01

    A set of program planning guides that include seven areas (1) Agricultural Production, (2) Agricultural Supplies and Services, (3) Agricultural Mechanics, (4) Agricultural Products, (5) Ornamental Horticulture, (6) Agricultural Resources, and (7) Forestry, were developed and introduced to high school applied biological and agricultural occupations…

  13. Solid Waste Management Program Plan

    SciTech Connect

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  14. Transportation technology program: Strategic plan

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The purpose of this report is to define the technology program required to meet the transportation technology needs for current and future civil space missions. It is a part of an integrated plan, prepared by NASA in part in response to the Augustine Committee recommendations, to describe and advocate expanded and more aggressive efforts in the development of advanced space technologies. This expanded program will provide a technology basis for future space missions to which the U.S. aspires, and will help to regain technology leadership for the U.S. on a broader front. The six aspects of this integrated program/plan deal with focused technologies to support space sciences, exploration, transportation, platforms, and operations as well as provide a Research and Technology Base Program. This volume describes the technologies needed to support transportation systems, e.g., technologies needed for upgrades to current transportation systems and to provide reliable and efficient transportation for future space missions. The Office of Aeronautics, Exploration, and Technology (OAET) solicited technology needs from the major agency technology users and the aerospace industry community and formed a transportation technology team (appendix A) to develop a technology program to respond to those needs related to transportation technologies. This report addresses the results of that team activity. It is a strategic plan intended for use as a planning document rather than as a project management tool. It is anticipated that this document will be primarily utilized by research & technology (R&T) management at the various NASA Centers as well as by officials at NASA Headquarters and by industry in planning their corporate Independent Research and Development (IR&D) investments.

  15. Environmental Planning and Ecology Program Annual Report.

    SciTech Connect

    Larsen, Barbara L.

    2008-01-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  16. Single Shell Tank (SST) Program Plan

    SciTech Connect

    HAASS, C.C.

    2000-03-21

    This document provides an initial program plan for retrieval of the single-shell tank waste. Requirements, technical approach, schedule, organization, management, and cost and funding are discussed. The program plan will be refined and updated in fiscal year 2000.

  17. Program Planning Concepts in Solid Waste Management

    ERIC Educational Resources Information Center

    Brown, Sanford M., Jr.

    1972-01-01

    Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)

  18. Program Planning Concepts in Solid Waste Management

    ERIC Educational Resources Information Center

    Brown, Sanford M., Jr.

    1972-01-01

    Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)

  19. Active Sites Environmental Monitoring Program: Program plan

    SciTech Connect

    Ashwood, T.L.; Wickliff, D.S.; Morrissey, C.M.

    1990-10-01

    DOE Order 5820.2A requires that low-level waste (LLW) disposal sites active on or after September 1988 and all transuranic (TRU) waste storage sites be monitored periodically to assure that radioactive contamination does not escape from the waste sites and pose a threat to the public or to the environment. This plan describes such a monitoring program for the active LLW disposal sites in SWSA 6 and the TRU waste storage sites in SWSA 5 North. 14 refs., 8 figs.

  20. Environmental Restoration Quality Program Plan

    SciTech Connect

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a entral Environmental Restoration Division'' to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization's objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  1. Environmental Restoration Program Management Control Plan

    SciTech Connect

    Not Available

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives.

  2. LLNL Waste Minimization Program Plan

    SciTech Connect

    Not Available

    1990-02-14

    This document is the February 14, 1990 version of the LLNL Waste Minimization Program Plan (WMPP). The Waste Minimization Policy field has undergone continuous changes since its formal inception in the 1984 HSWA legislation. The first LLNL WMPP, Revision A, is dated March 1985. A series of informal revision were made on approximately a semi-annual basis. This Revision 2 is the third formal issuance of the WMPP document. EPA has issued a proposed new policy statement on source reduction and recycling. This policy reflects a preventative strategy to reduce or eliminate the generation of environmentally-harmful pollutants which may be released to the air, land surface, water, or ground water. In accordance with this new policy new guidance to hazardous waste generators on the elements of a Waste Minimization Program was issued. In response to these policies, DOE has revised and issued implementation guidance for DOE Order 5400.1, Waste Minimization Plan and Waste Reduction reporting of DOE Hazardous, Radioactive, and Radioactive Mixed Wastes, final draft January 1990. This WMPP is formatted to meet the current DOE guidance outlines. The current WMPP will be revised to reflect all of these proposed changes when guidelines are established. Updates, changes and revisions to the overall LLNL WMPP will be made as appropriate to reflect ever-changing regulatory requirements. 3 figs., 4 tabs.

  3. An Introduction to NCOA's Retirement Planning Program.

    ERIC Educational Resources Information Center

    Fitzpatrick, Edmund W.

    1980-01-01

    Describes the National Council on the Aging (NCOA)-Industry Consortium Retirement Planning Program, which consists of eight modules corresponding to eight major areas of retirement planning: life-style planning, financial planning, new careers, leisure time, health, interpersonal relationships, living arrangements, and community services. (SK)

  4. Multi-Year Program Plan - Building Regulatory Programs

    SciTech Connect

    none,

    2010-10-01

    This document presents DOE’s multi-year plan for the three components of the Buildings Regulatory Program: Appliance and Equipment Efficiency Standards, ENERGY STAR, and the Building Energy Codes Program. This document summarizes the history of these programs, the mission and goals of the programs, pertinent statutory requirements, and DOE’s 5-year plan for moving forward.

  5. Mathematical Programming Models in Educational Planning.

    ERIC Educational Resources Information Center

    McNamara, James F.

    This document begins by defining and discussing educational planning. A brief overview of mathematical programing with an explanation of the general linear programing model is then provided. Some recent applications of mathematical programing techniques to educational planning problems are reviewed, and their implications for educational research…

  6. Disposal phase experimental program plan

    SciTech Connect

    1997-01-31

    The Waste Isolation Pilot Plant (WIPP) facility comprises surface and subsurface facilities, including a repository mined in a bedded salt formation at a depth of 2,150 feet. It has been developed to safely and permanently isolate transuranic (TRU) radioactive wastes in a deep geological disposal site. On April 12, 1996, the DOE submitted a revised Resource Conservation and Recovery Act (RCRA) Part B permit application to the New Mexico Environment Department (NMED). The DOE anticipates receiving an operating permit from the NMED; this permit is required prior to the start of disposal operations. On October 29, 1996, the DOE submitted a Compliance Certification Application (CCA) to the US Environmental Protection Agency (EPA) in accordance with the WIPP land Withdrawal Act (LWA) of 1992 (Public Law 102-579) as amended, and the requirements of Title 40 of the Code of Federal Regulations (40 CFR) Parts 191 and 194. The DOE plans to begin disposal operations at the WIPP in November 1997 following receipt of certification by the EPA. The disposal phase is expected to last for 35 years, and will include recertification activities no less than once every five years. This Disposal Phase Experimental Program (DPEP) Plan outlines the experimental program to be conducted during the first 5-year recertification period. It also forms the basis for longer-term activities to be carried out throughout the 35-year disposal phase. Once the WIPP has been shown to be in compliance with regulatory requirements, the disposal phase gives an opportunity to affirm the compliance status of the WIPP, enhance the operations of the WIPP and the national TRU system, and contribute to the resolution of national and international nuclear waste management technical needs. The WIPP is the first facility of its kind in the world. As such, it provides a unique opportunity to advance the technical state of the art for permanent disposal of long-lived radioactive wastes.

  7. Active Sites Environmental Monitoring Program: Program plan

    SciTech Connect

    Ashwood, T.L.; Wickliff, D.S.; Morrissey, C.M.

    1992-02-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of transuranic (TRU) waste and active low-level waste (LLW) facilities at Oak Ridge National Laboratory (ORNL) in accordance with US Department of Energy (DOE) Order 5820.2A. Active LLW facilities in Solid Waste Storage Area (SWSA) 6 include Tumulus I and Tumulus II, the Interim Waste Management Facility (IWMF), LLW silos, high-range wells, asbestos silos, and fissile wells. The tumulus pads and IWMF are aboveground, high-strength concrete pads on which concrete vaults containing metal boxes of LLW are placed; the void space between the boxes and vaults is filled with grout. Eventually, these pads and vaults will be covered by an engineered multilayered cap. All other LLW facilities in SWSA 6 are below ground. In addition, this plan includes monitoring of the Hillcut Disposal Test Facility (HDTF) in SWSA 6, even though this facility was completed prior to the data of the DOE order. In SWSA 5 North, the TRU facilities include below-grade engineered caves, high-range wells, and unlined trenches. All samples from SWSA 6 are screened for alpha and beta activity, counted for gamma-emitting isotopes, and analyzed for tritium. In addition to these analytes, samples from SWSA 5 North are analyzed for specific transuranic elements.

  8. Total quality management program planning

    SciTech Connect

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  9. Collaborative Strategic Planning for Older Adult Programming.

    ERIC Educational Resources Information Center

    Muzzarelli, Robert; Young, William H.

    1992-01-01

    Given the implications of current trends showing the aging of the population, continuing education programs for older adults should focus on "retirement employment." A strategic planning approach can incorporate forecasting into program development. (SK)

  10. Guide to Vocational Program Planning. Revised.

    ERIC Educational Resources Information Center

    Virginia State Dept. of Education, Richmond. Div. of Adolescent Education.

    This revised edition of a guide to vocational program planning in Virginia is intended to be used as a principal resource for vocational program design and application and to serve as a supplement to program information provided to localities by the individual service areas. The guide is organized in eight sections, one for each program area:…

  11. Nevada Experiments and Operations Program (N Program) Management Plan

    SciTech Connect

    Nattrass, L.; Anastasio, M.R.

    2000-02-01

    This plan briefly describes the Lawrence Livermore National Laboratory (LLNL) institutional structure and how Nevada Experiments and Operations Program (N Program's) organization fits within this structure, roles and responsibilities, and management processes that govern N Program activities. This plan also serves as the Integrated Safety Management (ISM) Implementation Plan for N Program work. This plan applies to all work performed by and for LLNL that falls under the oversight of DOE/NV except LLNL activities in support of the Yucca Mountain Project Office (YMPO).

  12. Compare and Contrast Program Planning Models

    ERIC Educational Resources Information Center

    Baskas, Richard S.

    2011-01-01

    This paper will examine the differences and similarities between two program planning models, Tyler and Caffarella, to reveal their strengths and weaknesses. When adults are involved in training sessions, there are various program planning models that can be used, depending on the goal of the training session. Researchers developed these models…

  13. Instructional Program Planning for Outdoor Education.

    ERIC Educational Resources Information Center

    Garbutt, Barbara; And Others

    A guide on instructional program planning for outdoor education, prepared for Oakland County (Michigan) teachers, contains suggestions for program planning and lists information sources on suitable outdoor activities. The purpose of outdoor education is defined as being: "to enrich, vitalize and complement content areas of the school…

  14. How much do family planning programs cost?

    PubMed

    Sparer, G; Okada, L M; Tillinghast, S

    1973-01-01

    The results of 2 cost studies on family planning programs are compared. National Analysts, Inc. studied 45 family planning programs for the program years 1968-1969. Westinghouse Population Center studied 27 family planning projects of 25 agencies for the program year 1970-1971. The Westinghouse projects were considerably larger in terms of operating costs than the National Analysts programs. Comparisons are made by way of multiple graphs and statistical tables. Per patient costs and the distribution of costs between direct medical services and indirect costs are consistent between the 2 studies. The results emphasize economies of scale and diseconomies of very large scale. From a cost basis, the ideal family planning project characteristics are: 1) a patient volume of approximately 3000; 2) a budget size of about $175,000; and 3) an institutional base. Programs with 1-site services were less costly than those with multiple sites or those using private physicians to provide the primary medical services.

  15. NASA aerospace pyrotechnically actuated systems: Program plan

    NASA Technical Reports Server (NTRS)

    Schulze, Norman R.

    1992-01-01

    The NASA Aerospace Pyrotechnically Actuated Systems (PAS) Program, a focused technology program, is being initiated to enhance the reliability, safety, and performance of pyrotechnically actuated systems. In broad terms, this Program Plan presents the approach that helps to resolve concerns raised by the NASA/DOD/DOE Aerospace Pyrotechnic Steering Committee. This Plan reflects key efforts needed in PAS technology. The resources committed to implement the Program will be identified in the Program Implementation Plan (PIP). A top level schedule is included along with major Program milestones and products. Responsibilities are defined in the PIP. The Plan identifies the goals and detailed objectives which define how those goals are to be accomplished. The Program will improve NASA's capabilities to design, develop, manufacture, and test pyrotechnically actuated systems for NASA's programs. Program benefits include the following: advanced pyrotechnic systems technology developed for NASA programs; hands-on pyrotechnic systems expertise; quick response capability to investigate and resolve pyrotechnic problems; enhanced communications and intercenter support among the technical staff; and government-industry PAS technical interchange. The PAS Program produces useful products that are of a broad-based technology nature rather than activities intended to meet specific technology objectives for individual programs. Serious problems have occurred with pyrotechnic devices although near perfect performance is demanded by users. The lack of a program to address those problems in the past is considered a serious omission. The nature of problems experienced as revealed by a survey are discussed and the origin of the program is explained.

  16. 24 Command Fire Improvement Action Program Plan

    SciTech Connect

    GRIFFIN, G.B.

    2000-12-01

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements.

  17. Natural Gas Multi-Year Program Plan

    SciTech Connect

    1997-12-01

    This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

  18. Goal programming for land use planning.

    Treesearch

    Enoch F. Bell

    1976-01-01

    A simple transformation of the linear programing model used in land use planning to a goal programing model allows the multiple goals implied by multiple use management to be explicitly recognized. This report outlines the procedure for accomplishing the transformation and discusses problems with use of goal programing. Of particular concern are the expert opinions...

  19. The Technical Assistance Program: A Program Plan.

    DTIC Science & Technology

    1985-09-01

    all de- Federal retirement system. velopments which affect rates, coverage, and enroll- (2) Medicare tax. All wages paid after December ment under the...contributions. If a Federal 𔃼) To determine the appropriae minimun rate -)f agency plans to recommend an award for a State or pay, the assignment

  20. Hazardous Waste Remedial Actions Program: Remedial Actions Planning Program Quality Assurance Program Plan

    SciTech Connect

    Not Available

    1989-04-01

    The purpose of this Plan is to describe the quality assurance (QA) requirements for the RAP Program by identifying the quality elements to be controlled and specifying how they will be controlled. The activities for which control elements will be identified include those relating to: preparation, review, and approval of plans, reports, and studies; execution of field and analytical work by subcontractors and other agents; control of subcontractors and other agents during other phases of work; and actions internal to the RAP Program to ensure proper execution of projects.

  1. Consolidated Fuel Reprocessing Program. National Program Plan FY 1984

    SciTech Connect

    Not Available

    1984-01-01

    This FY 1984 National Program Plan for the Consolidated Fuel Reprocessing Program (CFRP) provides specific guidance from the Department of Energy (DOE) for FY 1984 CFRP activities and a baseline for activities in future years. This is the second issue of the Plan, which is updated anually and summarizes program objectives, summary plans and schedules, budget allocations, contractor involvement, and interfaces with other research programs. The National Program Plan is a controlling document for the Technical Program Plan, which is prepared annually by the CFRP at Oak Ridge National Laboratory (ORNL) and is one of the hierarchical group of planning documents. The CFRP is a part of the DOE's program of research and development (R and D) on nuclear fission systems and is directed by the LMFBR Fuel Cycle Projects Division, Office of Spent Fuel Management and Reprocessing Systems at DOE-Headquarters through the Oak Ridge Operations Office (ORO). The strategy of the program is to maintain the capability to commit to a breeder option through a strong R and D program on breeder reprocessing and alternate fuels and fuel cycles in order to achieve operating and economic advantages.

  2. Consolidated Fuel Reprocessing Program: National Program Plan, FY 1983

    SciTech Connect

    Not Available

    1983-01-01

    This FY 1983 National Program Plan for the Consolidated Fuel Reprocessing Program (CFRP) provides specific guidance from the Department of Energy (DOE) for FY 1983 CFRP activities and a baseline for future year activities. This initial issue of the Plan, which will be updated annually, summarizes program objectives, summary plans and schedules, budget allocations, contractor involvement, and interfaces with other research programs. The National Program Plan is a controlling document for the Technical Program Plan, which is prepared annually by the CFRP at ORNL and is one of a hierarchical group of planning documents. The CFRP is a part of the DOE's program of research and development (R and D) on nuclear fission systems and is directed by the LMFBR Fuel Cycle Projects Division, Office of Spent Fuel Management and Reprocessing Systems at DOE-Headquarters through the Oak Ridge Operations Office (ORO). The strategy of the program is to maintain the capability to commit to a breeder option through a strong R and D program on breeder reprocessing and alternate fuels and fuel cycles to achieve operating and economic advantages.

  3. Consolidated Fuel Reprocessing Program. National Program Plan, FY 1985

    SciTech Connect

    Not Available

    1985-03-01

    This FY 1985 National Program Plan for the Consolidated Fuel Reprocessing Program (CFRP) provides specific guidance from the Department of Energy (DOE) for FY 1985 CFRP activities and a baseline for activities in future years. This is the third issue of the Plan, which is updated annually and summarizes program objectives, plans, and schedules, budget allocations, contractor involvements, and interfaces with other research programs. The National Program Plan is a controlling document for the Technical Program Plan, which is prepared annually by the CFRP at Oak Ridge National Laboratory (ORNL) and is one of a hierarchical group of planning documents. The CFRP is a part of the DOE's program of research and development (R and D) on nuclear fission systems and is directed by the LMFBR Fuel Cycle Projects Division, Office of Spent Fuel Management and Reprocessing Systems at DOE-Headquarters through the Oak Ridge Operations Office (ORO). The strategy of the program is to maintain the capability to commit to a breeder option through a strong fuel cycle R and D program and international technical exchanges.

  4. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  5. Evaluation of the Navy Master Planning Program

    DTIC Science & Technology

    1976-05-01

    master planning has absorbed the additional roles of program management and public relations marketing . The Navy planner is now deeply involved in...master planning 62conducted by NAVFAC headquarters in 1972, various Navy planning directives, a " Market Survey" of NAVFAC services and customer 63...econoilic, environmental and socia -political impli- cations. -47 - NOTES: PART I I Department of the Navy, Naval Facilities Engineering Command, "Command

  6. Quality assurance program plan for Building 327

    SciTech Connect

    Tanke, J.M.

    1997-05-22

    This Quality Assurance Program Plan (QAPP) provides an overview of the quality assurance program for Building 327. The program applies to the facility safety structures, systems, and components and to activities that could affect safety structures, systems, and components. Adherence to the quality assurance program ensures the following: US Department of Energy missions and objectives are effectively accomplished; Products and services are safe, reliable, and meet or exceed the requirements and expectations of the user; Hazards to the public, to Hanford Site and facility workers, and to the environment are minimized. The format of this Quality Assurance Program Plan is structured to parallel that of 10 CFR 83 0.120, Quality Assurance Requirements. This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the 324 Building B-Cell Safety Cleanout Project (BCCP). This QAPP is responsive to the Westinghouse Hanford Company Quality Assurance Program and Implementation Plan, WHC-SP 113 1, for 10 CFR 830.120, Nuclear Safety Management, Quality Assurance Requirements; and DOE Order 5700.6C, Quality Assurance. This QAPP supersedes PNNL PNL-MA-70 QAP Quality Assurance Plan No. WTC-050 Rev. 2, issue date May 3, 1996.

  7. Building Technologies Program Multi-Year Program Plan Program Portfolio Management 2008

    SciTech Connect

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for program portfolio management, including the program portfolio management process, program analysis, performance assessment, stakeholder interactions, and cross-cutting issues.

  8. State Plans for Implementing Programs of Study

    ERIC Educational Resources Information Center

    Lewis, Morgan V.; Overman, Laura

    2008-01-01

    This article examines how the states plan to implement the Programs of Study (POS) that were mandated by the 2006 reauthorization of the federal legislation for career and technical education. A coding system was developed for summarizing the methods described in the plans of all 50 states, the District of Columbia, Guam, and the Virgin Islands.…

  9. Tank waste remediation system program plan

    SciTech Connect

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  10. Toward a More Comprehensive Career Planning Program.

    ERIC Educational Resources Information Center

    Cohen, Stephen L.; Meyer, Herbert H.

    1979-01-01

    Suggests procedures and techniques for successful organizational human resources and career planning programs, featuring the human resource inventory and assessment center approach for personnel judged to have managerial potential. Includes a chart of the proposed career planning model for nonmanagement and lower-management personnel. (MF)

  11. State Plans for Implementing Programs of Study

    ERIC Educational Resources Information Center

    Lewis, Morgan V.; Overman, Laura

    2008-01-01

    This article examines how the states plan to implement the Programs of Study (POS) that were mandated by the 2006 reauthorization of the federal legislation for career and technical education. A coding system was developed for summarizing the methods described in the plans of all 50 states, the District of Columbia, Guam, and the Virgin Islands.…

  12. Wind Shear radar program future plans

    NASA Technical Reports Server (NTRS)

    Robertson, Roy E.

    1991-01-01

    The status of the Windshear Radar Program at the Collins Air Transport Division of Rockwell International is given in viewgraph form. Topics covered include goals, modifications to the WXR-700 system, flight test plans, technical approaches, design considerations, system considerations, certification, and future plans.

  13. Tank waste remediation system environmental program plan

    SciTech Connect

    Borneman, L.E.

    1998-01-09

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996).

  14. Preretirement Programs within Service Firms: Existing and Planned Programs.

    ERIC Educational Resources Information Center

    Siegel, Sidney R.; Rives, Janet M.

    1980-01-01

    A study of 300 nonmanufacturing firms' current and projected preretirement programs indicated that (1) personnel departments have primary responsibility for existing programs, (2) focus is changing from financial planning to psychological counseling, and (3) such programs benefit the company as well as the employee. (SK)

  15. Planning integration FY 1996 program plan. Revision 1

    SciTech Connect

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M&I) contract.

  16. Program Access Master Planning Guide.

    ERIC Educational Resources Information Center

    California State and Consumer Services Agency, Sacramento. Office of Statewide Compliance Coordination.

    Designed for use by California state departments, this guide is a standardized approach to developing a master plan to ensure that persons with disabilities who are candidates or applicants for employment, employees, or recipients of state services are provided equal opportunities and fair treatment. It outlines a six-step process to evaluate a…

  17. Pupil Transportation Safety Program Plan.

    ERIC Educational Resources Information Center

    Delahanty, Joseph F.; And Others

    This study has been undertaken to assess the magnitude of the school bus safety problem and to develop a plan to improve pupil transportation safety. The resulting report provides estimates of school bus population and daily usage, gives an account of injuries and fatalities that occur annually, and compares the safety records of school buses to…

  18. Family planning programs and fertility decline.

    PubMed

    Cuca, R

    1980-01-01

    A recently completed World Bank statistical study of family planning in 63 developing countries indicated that countries which experienced a large decline in birth rates between 1960-1977 were more likely to have a family planning program, an official population policy aimed at decreasing the birth rate, and a relatively high level of development than countries which experienced smaller or no decline in birth rates. The 65 countries represented 95% of the population of the developing world. Birth rate declines of 10% or more between 1960-1977 were experienced by: 1) 10 of the 26 countries which had a family planning program and a policy aimed at reducing the birth rate; 2) 6 of the 19 countries which had a family planning program but lacked clearly defined population objectives; and 3) 2 of the 18 countries without any population policy or program. Furthermore, the implementation of a family planning program and the adoption of a population policy were directly related to the development level of the country. This finding suggested that countries need to reach a certain level of development before they have the capacity to develop population programs and policies. When a country is sufficiently advanced to collect population data, awareness of population problems increases and they are more likely to adopt a population policy. In addition, government efficiency increases as development proceeds and governments must have a certain level of efficiency before they can implement effective programs.

  19. The 1989 long-range program plan

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The President's National Space Policy of 1988 reaffirms that space activities serve a variety of vital national goals and objectives, including the strengthening of U.S. scientific, technological, political, economic, and international leadership. The new policy stresses that civil space activities contribute significantly to enhancing America's world leadership. Goals and objectives must be defined and redefined, and each advance toward a given objective must be viewed as a potential building block for future programs. This important evolutionary process for research and development is reflected, describing NASA's program planning for FY89 and later years. This plan outlines the direction of NASA's future activities by discussing goals, objectives, current programs, and plans for the future. The 1989 plan is consistent with national policy for both space and aeronautics, and with the FY89 budget that the President submitted to Congress in February 1988.

  20. Planning and Implementing Career Education Programs: Perspectives.

    ERIC Educational Resources Information Center

    Crim, Alonzo A.; And Others

    The collection of six papers offers perspectives on planning and implementing career education programs. The first paper, the Introduction (David Goodwin), deals with program implementation. The second paper, Priorities in Career Education (Alonzo A. Crim), describes the historical origins of career education in the Atlanta school system with a…

  1. Engineering Technology Programs. Preliminary Curriculum Planning Guide.

    ERIC Educational Resources Information Center

    Center for Occupational Research and Development, Inc., Waco, TX.

    Developed as a resource to assist in a major revision underway in Georgia area technical schools to change curricula for preparing engineering technicians, this preliminary program-planning guide describes curriculum structures for specialized programs in three major areas--electronics, electromechanics, and mechanics. The handbook, which is…

  2. Effective Comprehensive Prevention Programs: A Planning Guide.

    ERIC Educational Resources Information Center

    Duncan, Andrew N.; Stephens-Burden, Stevie; Bickel, Ann

    This guidebook is designed to be used in implementing comprehensive prevention programs for children and youth in schools and communities. The primary goals of this planning guide are: provide educators and communities with a prevention model that will help them facilitate the implementation of effective comprehensive programs; provide a framework…

  3. Agricultural Products: Program Planning Guide: Volume 4.

    ERIC Educational Resources Information Center

    Welton, Richard; Robb, Sam

    The program planning guide for agricultural products was written to assist Applied Biological and Agricultural Occupations (ABAO) teachers in enriching existing programs and/or to provide the basis for expansion of offerings to include additional materials for the cluster areas of meat and meat byproducts, dairy processing, fruit and vegetable…

  4. Forestry: Program Planning Guide: Volume 7.

    ERIC Educational Resources Information Center

    Roth, Paul L.; And Others

    The program planning guide for forestry was written to assist Applied Biological and Agricultural Occupations (ABAO) teachers in enriching existing programs and/or to provide the basis for expansion of offerings to include additional materials for the cluster areas of forests, forest protection, logging, wood utilization, recreation, and special…

  5. A Guide to Planning Alcoholism Treatment Programs.

    ERIC Educational Resources Information Center

    McGough, Dixie P.; Hindman, Margaret H.

    This guide contains information from the alcoholism literature and from interviews with people in state alcoholism agencies, major professional associations, and public and private service programs. It is designed to help readers plan and develop community alcoholism programs by providing an overview of the many considerations involved in starting…

  6. Ornamental Horticulture: Program Planning Guide: Volume 5.

    ERIC Educational Resources Information Center

    Ross, Roger R.; Stitt, Thomas R.

    The program planning guide for ornamental horticulture was written to assist Applied Biological and Agricultural Occupations (ABAO) teachers in enriching existing programs and/or to provide the basis for expansion of offerings to include additional materials for the cluster areas of arboriculture, floriculture, greenhouse operation and management,…

  7. Planning an Education Program for Dental Hygienists.

    ERIC Educational Resources Information Center

    Bruce, Harry W.; And Others

    Intended for adaptation to local situations, the handbook was prepared to assist interested groups to determine whether a dental hygiene educational program is needed and feasible, and to supply basic guidelines for planning. The introduction deals with dental hygiene in preventive dentistry and the historical development of educational programs.…

  8. Quality assurance program plan fuel supply shutdown

    SciTech Connect

    Metcalf, I.L.

    1998-09-21

    This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP.

  9. TROPOSPHERIC AEROSOL PROGRAM, PROGRAM PLAN, MARCH 2001

    SciTech Connect

    SCHWARTZ,S.E.; LUNN,P.

    2001-03-01

    The goal of Tropospheric Aerosol Program (TAP) will be to develop the fundamental scientific understanding required to construct tools for simulating the life cycle of tropospheric aerosols--the processes controlling their mass loading, composition, and microphysical properties, all as a function of time, location, and altitude. The TAP approach to achieving this goal will be by conducting closely linked field, modeling, laboratory, and theoretical studies focused on the processes controlling formation, growth, transport, and deposition of tropospheric aerosols. This understanding will be represented in models suitable for describing these processes on a variety of geographical scales; evaluation of these models will be a key component of TAP field activities. In carrying out these tasks TAP will work closely with other programs in DOE and in other Federal and state agencies, and with the private sector. A forum to directly work with our counterparts in industry to ensure that the results of this research are translated into products that are useful to that community will be provided by NARSTO (formerly the North American Research Strategy on Tropospheric Ozone), a public/private partnership, whose membership spans government, the utilities, industry, and university researchers in Mexico, the US, and Canada.

  10. River Protection Project (RPP) Environmental Program Plan

    SciTech Connect

    POWELL, P.A.

    2000-03-29

    This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

  11. Natural gas strategic plan and program crosscut plans

    SciTech Connect

    1995-06-01

    The natural gas strategic plan recognizes the challenges and opportunities facing increased U.S. natural gas use. Focus areas of research include natural gas supply, delivery, and storage, power generation, industrial, residential and commercial, natural gas vehicles, and the environment. Historical aspects, mission, situation analysis, technology trends, strategic issues, performance indicators, technology program overviews, and forecasting in the above areas are described.

  12. 23 CFR 450.308 - Funding for transportation planning and unified planning work programs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Funding for transportation planning and unified planning... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.308 Funding for transportation planning and unified planning work programs. (a)...

  13. Information Technology Standards Program management plan

    SciTech Connect

    1998-05-01

    This document presents a logical and realistic plan to implement the Information Technology (IT) Standards Program throughout the Department of Energy (DOE). It was developed by DOE Chief Information Officer (CIO) staff, with participation from many other individuals throughout the DOE complex. The DOE IT Standards Program coordinates IT standards activities Department-wide, including implementation of standards to support the DOE Information Architecture. The Program is voluntary, participatory, and consensus-based. The intent is to enable accomplishment of the DOE mission, and the Program is applicable to all DOE elements, both Federal and contractor. The purpose of this document is to describe the key elements of the DOE IT Standards Program.

  14. Integrated propulsion technology demonstrator. Program plan

    NASA Technical Reports Server (NTRS)

    1994-01-01

    NASA and Rockwell have embarked on a cooperative agreement to define, develop, fabricate, and operate an integrated propulsion technology demonstrator (IPTD) for the purpose of validating design, process, and technology improvements of launch vehicle propulsion systems. This program, a result of NRA8-11, Task Area 1 A, is jointly funded by both NASA and Rockwell and is sponsored by the Reusable Launch Vehicle office at NASA Marshall Space flight Center. This program plan provides to the joint NASA/Rockwell integrated propulsion technology demonstrator (IPTD) team a description of the activities within tasks / sub tasks and associated schedules required to successfully achieve program objectives. This document also defines the cost elements and manpower allocations for each sub task for purpose of program control. This plan is updated periodically by developing greater depth of direction for outyear tasks as the program matures. Updating is accomplished by adding revisions to existing pages or attaching page revisions to this plan. In either case, revisions will be identified by appropriate highlighting of the change, or specifying a revision page through the use of footnotes on the bottom right of each change page. Authorization for the change is provided by the principal investigators to maintain control of this program plan document and IPTD program activities.

  15. Total quality management -- Remedial actions planning program

    SciTech Connect

    Petty, J.L.; Horne, T.E.

    1989-01-01

    This paper describes the management approach being taken within the Hazardous Waste Remedial Actions Program (HAZWRAP) Support Contractor Office (SCO) to ensure quality of services in a highly competitive waste management environment. An overview is presented of the contractor support role assigned to Martin Marietta Energy Systems, Inc., by the Department of Energy (DOE) national program for managing hazardous waste. The HAZWRAP SCO mission, organizational structure, and major programs are outlined, with emphasis on waste management planning for the DOE Work for Others (WFO) Program. The HAZWRAP SCO provides waste management technical support, via interagency agreements between DOE and various Department of Defense (DOD) agencies for DOD sponsors planning remedial response actions. The remainder of the paper focuses on how the concept of Total Quality Management is applied to the HAZWRAP Remedial Actions Planning (RAP) Program. The management challenge is to achieve quality on a ''system'' basis where all functional elements of program management synergistically contribute to the total quality of the effort. The quality assurance (QA) program requirements applied to the RAP Program and its subcontractors are discussed. The application of management principles in the areas of program management, procurement, and QA to achieve total quality is presented. 3 refs.

  16. WSC Bridge Program Planning Guide

    ERIC Educational Resources Information Center

    Jenkins, Davis

    2004-01-01

    Increasingly jobs that pay more than subsistence wages and offer opportunities for career advancement require at least some training beyond high school, even at the entry level. Bridge training programs are designed to prepare individuals without the requisite basic skills for postsecondary training leading to career-path employment and further…

  17. Agricultural Occupations Program Planning Guide.

    ERIC Educational Resources Information Center

    Hemp, Paul E.; Mayer, Leon

    The major program objectives of agricultural occupations courses are (1) to develop agricultural competencies needed by individuals engaged in or preparing to engage in production agriculture, and in agricultural occupations other than production agriculture; (2) to develop an understanding of the career opportunities in agriculture; (3) to…

  18. Space radiation health program plan

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The Space Radiation Health Program intends to establish the scientific basis for the radiation protection of humans engaged in the exploration of space, with particular emphasis on the establishment of a firm knowledge base to support cancer risk assessment for future planetary exploration. This document sets forth the technical and management components involved in the implementation of the Space Radiation Health Program, which is a major part of the Life Sciences Division (LSD) effort in the Office of Space Science and Applications (OSSA) at the National Aeronautics and Space Administration (NASA). For the purpose of implementing this program, the Life Sciences Division supports scientific research into the fundamental mechanisms of radiation effects on living systems and the interaction of radiation with cells, tissues, and organs, and the development of instruments and processes for measuring radiation and its effects. The Life Sciences Division supports researchers at universities, NASA field centers, non-profit research institutes and national laboratories; establishes interagency agreements for cooperative use and development of facilities; and conducts a space-based research program using available and future spaceflight vehicles.

  19. Building Technologies Program Multi-Year Program Plan Program Overview 2008

    SciTech Connect

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan Program Overview 2008, including market overview and federal role, program vision, mission, design and structure, and goals and multi-year targets.

  20. Microgravity Program strategic plan, 1991

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The all encompassing objective of the NASA Microgravity Program is the use of space as a lab to conduct research and development. The on-orbit microgravity environment, with its substantially reduced buoyancy forces, hydrostatic pressures, and sedimentation, enables the conduction of scientific studies not possible on Earth. This environment allows processes to be isolated and controlled with an accuracy that cannot be obtained in the terrestrial environment. The Microgravity Science and Applications Div. has defined three major science categories in order to develop a program structure: fundamental science, including the study of the behavior of fluids, transport phenomena, condensed matter physics, and combustion science; materials science, including electronic and photonic materials, metals and alloys, and glasses and ceramics; and biotechnology, focusing on macromolecular crystal growth as well as cell and molecular science. Experiments in these areas seek to provide observations of complex phenomena and measurements of physical attributes with a precision that is enabled by the microgravity environment.

  1. MHD Program Plan, FY 1992

    NASA Astrophysics Data System (ADS)

    1991-10-01

    The current MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. Essential elements of the current program include the following: (1) develop technical and environmental data for the integrated MHD topping cycle system through POC testing (1,000 hours); (2) develop technical and environmental data for the integrated MHD bottoming cycle sub system through POC testing (4,000 hours); (3) design, construct, and operate a seed regeneration POC facility (SRPF) capable of processing spent seed materials from the MHD bottoming cycle; (4) prepare conceptual designs for a site specific MHD retrofit plant; and (5) continue system studies and supporting research necessary for system testing. The current MHD program continues to be directed toward coal fired power plant applications, both stand-alone and retrofit. Development of a plant should enhance the attractiveness of MHD for applications other than electrical power. MHD may find application in electrical energy intensive industries and in the defense sector.

  2. Hanford Environmental Management Program plan; Revision 1

    SciTech Connect

    DeFigh-Price, C.

    1990-08-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office. Westinghouse Hanford Company has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as regulatory reporting and planning and to facilitate compliance with environmental regulations. Key activities include preparing and/or coordinating waste management and environmental restoration site-wide planning documents, maintaining the Waste Inventory Data System, coordinating site-wide regulatory reporting (SARA Title III, Dangerous Waste Report, etc.), Tri-Party Agreement Administration and Base (nonprogram specific) regulatory permitting and National Environmental Policy Act activities. Fiscal year (FY) 1991 is the first year this activity will be directly funded. This document describes accomplishments in FY 1990, the scope of work funded by this program for FY 1991, the prioritized tasks covered, and the management structure in place. 16 refs., 4 figs., 1 tab.

  3. Ocean Thermal Energy Conversion Program Management Plan

    SciTech Connect

    Combs, R E

    1980-01-01

    The Office of the Associate Laboratory Director for Energy and Environmental Technology has established the OTEC Program Management Office to be responsible for the ANL-assigned tasks of the OTEC Program under DOE's Chicago Operations and Regional Office (DOE/CORO). The ANL OTEC Program Management Plan is essentially a management-by-objective plan. The principal objective of the program is to provide lead technical support to CORO in its capacity as manager of the DOE power-system program. The Argonne OTEC Program is divided into three components: the first deals with development of heat exchangers and other components of OTEC power systems, the second with development of biofouling counter-measures and corrosion-resistant materials for these components in seawater service, and the third with environmental and climatic impacts of OTEC power-system operation. The essential points of the Management Plan are summarized, and the OTEC Program is described. The organization of the OTEC Program at ANL is described including the functions, responsibilities, and authorities of the organizational groupings. The system and policies necessary for the support and control functions within the organization are discussed. These functions cross organizational lines, in that they are common to all of the organization groups. Also included are requirements for internal and external reports.

  4. Tank waste remediation system program plan

    SciTech Connect

    Powell, R.W.

    1998-01-09

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

  5. Environmental Restoration Program Document Control Plan

    SciTech Connect

    Montgomery, L.M.

    1993-09-01

    This Environmental Restoration (ER) Program Document Control Plan has been developed to comply with the document control system requirements of the US Department of Energy, Richland Operations Office (RL), the Hanford Federal Facility and the ER Program. One of the five components, or summary subprojects, of the Environmental Restoration (ER) Program is program management and support, which includes both management systems development and information and data management. Efforts within the management systems development area include the creation of a document control plan. Westinghouse Hanford Company (WHC) has developed and established an overall document control system that governs the methods by which all WHC documents are generated, maintained, and disposed of. The ER Program performing organizations within WHC utilize the established WHC document control systems to the maximum extent possible. These systems are discussed in Chapters 3.0 and 4.0 of this plan. In addition, this plan describes the documents that require control within the ER Program and how they will be controlled.

  6. Building Technologies Program Planning Summary

    SciTech Connect

    none,

    2009-11-01

    The U.S. Department of Energy’s (DOE) Building Technologies Program (BTP) works in partnership with industry, state, municipal, and other federal organizations to achieve the goals of marketable net-zero energy buildings. To carry out its mission, BTP involves builders; appliance, window, lighting, operational systems, and component manufacturers; and end users in setting the program’s research priorities. These groups advise and help guide BTP through implementing, deploying, and standardizing new technologies, equipment, and processes being developed and tested in DOE’s national laboratories and in real-world applications in many U.S. communities.

  7. Program overview of peacekeeper flight test planning

    NASA Astrophysics Data System (ADS)

    Woodbury, S.; Gorman, R. G.

    1983-11-01

    This paper will present an overview of the planning involved in designing the flight test program for the Peacekeeper weapon system. Items to be discussed are: the Peacekeeper missile and launch facilities description; the overall flight test objectives progression from first flight through initial operational capability (IOC); mission design and data acquisition; impact of range safety constraints; requirement for development of new range sensors; program plans for mission evaluation and the integration of test reports; and a short discussion of the universal documentation system (UDS).

  8. NASA program planning on nuclear electric propulsion

    NASA Technical Reports Server (NTRS)

    Bennett, Gary L.; Miller, Thomas J.

    1992-01-01

    As part of the focused technology planning for future NASA space science and exploration missions, NASA has initiated a focused technology program to develop the technologies for nuclear electric propulsion and nuclear thermal propulsion. Beginning in 1990, NASA began a series of interagency planning workshops and meetings to identify key technologies and program priorities for nuclear propulsion. The high-priority, near-term technologies that must be developed to make NEP operational for space exploration include scaling thrusters to higher power, developing high-temperature power processing units, and developing high power, low-mass, long-lived nuclear reactors.

  9. NASA program planning on nuclear electric propulsion

    SciTech Connect

    Bennett, G.L.; Miller, T.J. NASA, Lewis Research Center, Cleveland, OH )

    1992-03-01

    As part of the focused technology planning for future NASA space science and exploration missions, NASA has initiated a focused technology program to develop the technologies for nuclear electric propulsion and nuclear thermal propulsion. Beginning in 1990, NASA began a series of interagency planning workshops and meetings to identify key technologies and program priorities for nuclear propulsion. The high-priority, near-term technologies that must be developed to make NEP operational for space exploration include scaling thrusters to higher power, developing high-temperature power processing units, and developing high power, low-mass, long-lived nuclear reactors. 28 refs.

  10. NASA: 1986 long-range program plan

    NASA Technical Reports Server (NTRS)

    1985-01-01

    For the years beyond FY 1986, the plan consists of activities that are technologically possible and considered to be in the national interest. Its implementation will ensure logical and continued progress in reaching the Nation's goals in aeronautics and space, consistent with the responsibilities assigned NASA by the National Aeronautics and Space Act of 1958, as amended. The major features of the programs are described in detail and the nature of the aeronautics and space programs beyond the year 2000 are projected. The abbreviations and acronyms that appear in this report are listed. The status of NASA's plans are summarized at the time of its preparation.

  11. Lightweight materials for transportation: Program plan

    SciTech Connect

    Not Available

    1993-07-01

    This Program Plan has been prepared by the Office of Transportation Materials in response to a request by the House Committee on Appropriations. It recognizes that a significant commitment to long-term, stable materials research and development (R&D) is required to realize the benefits of lighter weight vehicles, including economic, environmental and energy related benefits. Extensive input was obtained from the major US automakers and from representative materials and component suppliers. Considerable interaction with the key members of the US Automotive Materials Partnership (USAMP) has ensured consistency of technical direction. The program will support R&D activity at industrial sites through competitively bid subcontracts with cost sharing anticipated at 30--50%, with the higher amounts in process scale-up and manufacturing technology development. The recommended LWM Program will enable industry to develop pecessary technology by utilizing their capabilities as well as accessing supporting technology at national laboratories, universities, ongoing program activity at NASA, DoD, DOT, NIST, etc., and thereby leverage industry resources through integrated team approaches. Many individual program efforts are currently in place that address small portions of the overall needs of the LWM Program, both within DOE and in other agencies. Cognizance of these and overall integration of research activities are planned as significant program management tasks. Because of the international nature of the automobile business, benchmarking of foreign technology and tracking of worldwide developments are also key program elements.

  12. Guide for Program Planning: Medical Laboratory Technician.

    ERIC Educational Resources Information Center

    Kahler, Carol, Ed.; And Others

    Prepared by the American Association of Junior Colleges and the National Council on Medical Technology Education, this guide discusses programs for career-entry supportive medical laboratory personnel which have been cooperatively planned by junior college personnel and the medical community, particularly pathologists and medical technologists.…

  13. Planning Programming Budgeting System: Fiscal Year 1971.

    ERIC Educational Resources Information Center

    El Dorado County Board of Education, Placerville, CA.

    To increase the efficiency of human and financial resource allocations, the El Dorado County, California, Office of Education initiated a planning, programing, budgeting system (PPBS). This document is a progress report on the effectiveness of the system after one year of operation. It contains (1) a statement on goals, (2) charts of the program…

  14. Systemwide Academic Program Review: The Florida Plan.

    ERIC Educational Resources Information Center

    Hill, Joan A.; And Others

    The Florida Plan for systemwide academic program review is detailed in this report. Factors leading to the initiation of systemwide review, including population changes and the changing role of the predominantly black Florida A&M University, are discussed. The design and scope of the review process are explained and selection of consultants to…

  15. Focus groups: a program planning technique.

    PubMed

    DesRosier, M B; Zellers, K C

    1989-03-01

    To successfully develop nurse retention programs, a thorough organizational analysis, including the identification of problems, is necessary. Used as a management tool, focus groups that use the organization's nursing staff provide a unique method of data collection for identifying problems that now exist in the organization. The authors discuss this method for obtaining information for strategic planning for retention of nurses.

  16. Systemwide Academic Program Review: The Florida Plan.

    ERIC Educational Resources Information Center

    Hill, Joan A.; And Others

    The Florida Plan for systemwide academic program review is detailed in this report. Factors leading to the initiation of systemwide review, including population changes and the changing role of the predominantly black Florida A&M University, are discussed. The design and scope of the review process are explained and selection of consultants to…

  17. Programming and Planning in Early Childhood Settings.

    ERIC Educational Resources Information Center

    Arthur, Leonie; And Others

    This book presents for discussion principles and issues that encourage early childhood educators to evaluate their current approaches to programming and planning for young chidren with emphasis on the individual child. The book offers the opportunity to affirm the practice of developmentally appropriate procedures and to suggest directions for…

  18. Life Planning Education: A Youth Development Program.

    ERIC Educational Resources Information Center

    Center for Population Options, Washington, DC.

    This document presents the curriculum guide for Life Planning Education, a youth development program that focuses on two of the most important tasks teenagers face: preparing for the world of work and dealing with their own sexual and reproductive development, feelings, and behaviors. These two tasks are integrated in the curriculum in a way that…

  19. VCE testbed program planning and definition study

    NASA Technical Reports Server (NTRS)

    Westmoreland, J. S.; Godston, J.

    1978-01-01

    The flight definition of the Variable Stream Control Engine (VSCE) was updated to reflect design improvements in the two key components: (1) the low emissions duct burner, and (2) the coannular exhaust nozzle. The testbed design was defined and plans for the overall program were formulated. The effect of these improvements was evaluated for performance, emissions, noise, weight, and length. For experimental large scale testing of the duct burner and coannular nozzle, a design definition of the VCE testbed configuration was made. This included selecting the core engine, determining instrumentation requirements, and selecting the test facilities, in addition to defining control system and assembly requirements. Plans for a comprehensive test program to demonstrate the duct burner and nozzle technologies were formulated. The plans include both aeroacoustic and emissions testing.

  20. The 1985 long-range program plan

    NASA Technical Reports Server (NTRS)

    1984-01-01

    That continual evolution of NASA's research and development, is reflected in the missions, goals, and objectives planned for FY1985 and later years, in accordance with the responsibilities by the National Aeronautics and Space Act of 1958, as amended. New starts for the next ten years and space program activities to year 2000 are highlighted including space science and applications, space flight, space station, space tracking and data systems, and space research and technology. Space programs for the early 21st century and aeronautics programs up to and beyond the year 2000 are also covered.

  1. Photovoltaics program plan, FY 1991--FY 1995

    SciTech Connect

    Not Available

    1991-10-01

    This program plan describes the goals and philosophy of DOE National Photovoltaics Program and its major research and development activities for fiscal years (FY) 1991 through 1995. The plan represents a consensus among researchers and manufacturers, as well as current and potential users of photovoltaics (PV). It defines the activites that we believe are necessary to continue the rapid progress toward acceptance of photovoltaics as a serious candidate for cost-competitive electric power generation by the utility, transportation, buildings, and industrial sectors. A succesful National Photovoltaics Program will help achieve many of our national priorities. The mission of the National Photovoltaics Program is to help US industry to develop photovoltaic technology for large-scale generation of economically competitive electric power in the United States, making PV a significant part of our national energy mix. To fully achieve this, we must continue to work toward the long-term goals established in our previous program plan: reducing the price of delivered electricity to 5 to 6 cents per kilowatt-hour (kWh), increasing lifetimes to 30 years, and increasing module efficiencies to 15% for flat-plate and 25% for concentrator technologies. If progress continues at its current pace, we expect that the PV industry will have installed at least 1000 megawatts (MW) of capacity in the United States and 500 MW internationally by the year 2000.

  2. Natural and accelerated bioremediation research program plan

    SciTech Connect

    1995-09-01

    This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE`s Office of Environmental Management (EM). The program builds on OHER`s tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER`s and Office of Energy Research`s (OER`s) commitment to supporting DOE`s environmental management mission and the belief that bioremediation is an important part of the solution to DOE`s environmental problems.

  3. 76 FR 7098 - Dealer Floor Plan Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-09

    ... ADMINISTRATION 13 CFR Parts 120 and 121 Dealer Floor Plan Pilot Program AGENCY: U.S. Small Business... Dealer Floor Plan Pilot Program to make available 7(a) loan guaranties for lines of credit that provide floor plan financing. This new Dealer Floor Plan Pilot Program was created in the Small Business...

  4. Waste Management Program management plan. Revision 1

    SciTech Connect

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  5. Environmental Restoration Quality Program Implementation Plan

    SciTech Connect

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  6. Exploration Technology Program plans and directions

    NASA Technical Reports Server (NTRS)

    Aldrich, Arnold; Rosen, Robert; Craig, Mark; Mankins, John C.

    1990-01-01

    A summary of the proposed Space Exploration Initiative (SEI) needs that have been identified is presented along with a detailed review of the status of SEI technology planning. Plans are also being formulated to implement an Exploration Technology Program (ETP) that will develop the major technologies required for SEI. The ETP will provide in the near term clear demonstrations of potential exploration technologies, results of research to support SEI architecture decisions, and a foundation of mature technology that is ready to be applied in the first round of SEI missions. A family of functional building blocks has been defined from which both lunar and Mars SEI mission architectures can be constructed.

  7. Phase C/D program development plan. Volume 1: Program plan

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.

  8. Review of Global Change Research Program plan

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2012-01-01

    The draft 10-year strategic plan for the U.S. Global Change Research Program (USGCRP), which proposes broadening the scope of the program from climate change only to climate change and climaterelated global changes, “is an important step in the right direction,” according to a 5 January review of the plan by a committee of the U.S. National Research Council (NRC) of the National Academies. However, the committee also said that the program's legislative mandate is even broader in allowing USGCRP to address many aspects of global change including climate change, the global hydrological cycle, and widespread land use changes. “The Program's legislative mandate is to address all of global change, whether or not related to climate. The Committee concurs that this broader scope is appropriate, but realizes that such an expansion may be constrained by budget realities and by the practical challenge of maintaining clear boundaries for an expanded program,” the report states. “We encourage sustained efforts to expand the Program over time, along with efforts to better define and prioritize what specific topics are included within the bounds of global change research.”

  9. Why some family planning program fail.

    PubMed

    1976-04-01

    40 experts representing Nepal, Malaysia, Thailand, Singapore, Korea, and the Philippines participated in a 3-day workshop in Manila in March 1976 for the purpose of discussing and proposing ways of dealing with the financial problems confronting the population programs of the individual countries. The Inter-Governmental Coordinating Committee for Southeast Asia Family/Population Planning sponsored the workshop. The recommendations made at the meeting were: 1) standardization of financing reporting procedures by the region's country programs on family planning; 2) closer coordination between donor agencies and policy-making bodies of country programs in the disbursement of funds; 3) frequent exchanges of experiences, ideas, technicaL knowledge, and other matters pertaining to the financial management of such programs; and 4) inclusion of applicable financial management topics in the training of clinical staffs and those involved in follow-up operations. Additionally, a proposal was made that national population organizations or committees develop research and evaluation units. Workshop discussion sessions focused on financial planning and management, accounting and disbursement of funds, use and control of foreign aid, cost of effectiveness and benefit analysis, and financial reporting.

  10. Repository-Based Software Engineering Program: Working Program Management Plan

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  11. Future plans for NASA's Oceanic Processes Program

    NASA Technical Reports Server (NTRS)

    Wilson, W. S.

    1980-01-01

    NASA's Oceanic Processes Program has the objectives to develop a scientific basis for viewing the oceans from space and to demonstrate the utility of such an undertaking. There are currently four flight projects concerning the oceanic area. These projects are related to the National Oceanic Satellite System (NOSS), the Dynamic Ocean Topography Experiment (TOPEX), the Gravity Satellite (GRAVSAT), and a Synthetic Aperture Radar (SAR) mission. NOSS is being planned as a limited operational demonstration of viewing the oceans from space. It is to provide a capability to observe surface winds, waves, temperature, color, ice cover, and currents. It is scheduled for launch in 1986. TOPEX and GRAVSAT are being planned as research missions and are both scheduled for launch about 1986. The SAR mission is being planned to provide a spaceborne capability to observe the surface of the land and the oceans.

  12. ATF Neutron Irradiation Program Technical Plan

    SciTech Connect

    Geringer, J. W.; Katoh, Yutai

    2016-03-01

    The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization of irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.

  13. Arctic contaminants research program: Research plan

    SciTech Connect

    Landers, D.H.; Ford, J.; Allen, S.; Curtis, L.; Omernik, J.M.

    1992-12-01

    The research plan was initially intended to contain the information needed to evaluate the U.S. Environmental Protection Agency (EPA) Arctic Contaminant Research Program (ACRP). The scientific aspects of the proposed research form the main body of the document and focus on objectives of the specific research components, current literature, approach, and rationale. The ACRP has three major components: (1) extensive sampling of lichens, mosses, and soils to provide a spatial understanding of the status and extent of contaminants present in arctic ecosystems, (2) lake sediment research to evaluate the source and history of arctic contaminant inputs, and (3) food web research to evaluate the possible effects of atmospherically transported pollutants on arctic food webs. The research plan will be used to provide a framework for the ACRP, based on the preliminary studies done to date and will be implemented over the next five years. The Program will undergo additional peer reviews at two-year intervals in the future.

  14. Environmental Restoration Quality Program Implementation Plan. Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  15. 23 CFR 450.308 - Funding for transportation planning and unified planning work programs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... work programs. 450.308 Section 450.308 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF... Programming § 450.308 Funding for transportation planning and unified planning work programs. (a) Funds... documented in a unified planning work program (UPWP) or simplified statement of work in accordance with...

  16. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    SciTech Connect

    Not Available

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  17. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    SciTech Connect

    Morrison, M.I.; McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D.

    1995-02-01

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections.

  18. How Strategic Planning Keeps You Sane when Delivering Distance Programs

    ERIC Educational Resources Information Center

    MacNeil, Dixie; Luzius, Kim; Dunkin, Sonya

    2010-01-01

    This paper details the advantages of creating a strategic plan in the development and delivery of distance programs at the authors' own institution. The steps involved in the planning process and the three key elements of a successful strategic plan are addressed. The key elements include a program plan explaining the roles/responsibilities of…

  19. How Strategic Planning Keeps You Sane when Delivering Distance Programs

    ERIC Educational Resources Information Center

    MacNeil, Dixie; Luzius, Kim; Dunkin, Sonya

    2010-01-01

    This paper details the advantages of creating a strategic plan in the development and delivery of distance programs at the authors' own institution. The steps involved in the planning process and the three key elements of a successful strategic plan are addressed. The key elements include a program plan explaining the roles/responsibilities of…

  20. Oil-fueled equipment research: program plan

    SciTech Connect

    Hutchinson, R.A.

    1986-09-01

    The purpose of this document is to define the basis for a US Department of Energy (DOE) program for oil-fueled equipment research. The needs for an benefits of the technical research are explained, and a research plan is presented. This program was developed by Pacific Northwest Laboratory (PNL) with assistance from Steven Winters Associates and input from Brookhaven National Laboratory, Oak Ridge National Laboratory, and many representatives of the heating-oil and oil-fueled equipment industries. The private sector input was extensive, obtained through a series of workshops and formal and informal surveys. The planning effort was directed by the Building Equipment Division of the DOE Office of Buildings and Community Systems. The objective of the oil-fueled equipment research program is to develop the technological basis for new equipment and operating strategies based on improved understanding of oil-burning fundamentals. The program will provide the oil-fueled equipment industry with the basis for developing a new, high-tech generation of equipment, and the oil distributors and equipment installers and consumers with improved knowledge of how best to install and operate such equipment.

  1. N Reactor Deactivation Program Plan. Revision 4

    SciTech Connect

    Walsh, J.L.

    1993-12-01

    This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities {center_dot} in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directive to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually.

  2. 75 FR 70061 - Dealer Floor Plan Pilot Program Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... ADMINISTRATION Dealer Floor Plan Pilot Program Meeting AGENCY: U.S. Small Business Administration (SBA). ACTION... agenda for a meeting regarding the Dealer Floor Plan Pilot Program established in the Small Business Jobs Act of 2010. The meeting will be open to the public. DATES: The Dealer Floor Plan Pilot Program...

  3. 20 CFR 653.112 - State agency program budget plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false State agency program budget plans. 653.112 Section 653.112 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR SERVICES... State agency program budget plans. (a) Each State agency, in its annual program budget plan, shall...

  4. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  5. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  6. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  7. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  8. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  9. 7 CFR 1221.121 - Programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Programs, plans, and projects. 1221.121 Section 1221..., Research, and Information § 1221.121 Programs, plans, and projects. (a) The Board shall receive and evaluate, or on its own initiative develop, and submit to the Secretary for approval any program, plan, or...

  10. 7 CFR 1216.52 - Programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Programs, plans, and projects. 1216.52 Section 1216... Assessments § 1216.52 Programs, plans, and projects. (a) The Board shall receive and evaluate, or on its own initiative develop, and submit to the Secretary for approval any program, plan, or project authorized under...

  11. The future of family planning programs.

    PubMed

    Caldwell, John C; Phillips, James F; Barkat-e-Khuda

    2002-03-01

    National family planning programs have been an important instrument in accelerating global fertility decline and in restricting ultimate world population to a level probably below ten billion. They began to come into being after 1950 and will probably go out of existence in most of the world's regions by 2050. The archetypal programs were instituted in Asia and North Africa. The end of the twentieth century is an appropriate half-way mark at which to evaluate the twentieth-century programs and to assess what changes in them will be needed for the twenty-first century. Some changes are necessary because dramatic events have occurred: (1) long-term replacement-level fertility has been attained in most of East Asia and some of Southeast Asia, and accordingly, some programs there are being phased out; (2) mainland South Asian fertility has been slower to decline; (3) international donor funding is diminishing and may not be significant during much of the twenty-first century; (4) the 1994 International Conference on Population and Development held in Cairo called for a radical change in programs away from demographic aims and toward reproductive health and the improvement of the situation of women; and (5) the future family planning frontier will be sub-Saharan Africa, for which radically new types of programs may have to be developed. These issues were discussed in January 2000 at a conference held in Dhaka, Bangladesh. A selection of contributions to the conference is published here. This article provides an overview of the issues based partly on this selection and partly on the discussions that took place at the conference.

  12. Quality Assurance Program Plan for the Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-03-30

    The United States Department of Energy (USDOE) has initiated the Environmental Restoration Program (ERP) in an effort to manage, control and remediate existing hazardous, toxic and radioactive wastes generated at the Portsmouth Gaseous Diffusion Plant (PORTS). This ERP Quality Assurance Program Plan (QAPP) is responsive to the PORTS ESH Division QAPP and the ES Environmental Restoration Division (ERD) QAPP. This QAPP establishes the policies, requirements and responsibilities by which an appropriate level of QA shall be implemented within the PORTS-ERP. All PORTS-ERP activities shall be conducted in accordance with the requirements of this document and/or of a project level document which is derivative of this document.

  13. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... annual review of its system safety program plan and system security plan. (b) In the event the rail transit agency's system safety program plan is modified, the rail transit agency must submit the modified... agency. (c) In the event the rail transit agency's system security plan is modified, the rail transit...

  14. Planning aquatic ecosystem restoration monitoring programs

    SciTech Connect

    Thom, R.M.; Wellman, K.F.

    1997-01-01

    This study was conducted as part of the Evaluation of Environmental Investments Research Program (EEIRP). The EEIRP is sponsored by the US Army Corps of Engineers. The objectives of this work are to (1) identify relevant approaches and features for environmental investment measures to be applied throughout the project life; (2) develop methods to access the effectiveness of the approach or feature for providing the intended environmental output; (3) develop and provide guidance for formulating environmental projects; and (4) provide guidance for formulating and identifying relevant cost components of alternate restoration plans.

  15. Standard Review Plan Update and Development Program

    SciTech Connect

    Not Available

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.

  16. Radiological Assistance Program Flight Planning Tool

    SciTech Connect

    Messick, C.; Pham, M.; Ridgeway, J.; Smith, R.

    2011-12-19

    The Radiological Assitance Program (RAP) is the National Nuclear Security Administration's (NNSA) first responder to radiological emergencies. RAP's mission is to identify and minimize radiological hazards, as well as provide radiological emergency response and technical advice to decision makers. One tool commonly used is aerial radiation detection equipment. During a response getting this equipment in the right place quickly is critical. The RAP Flight Planning Tool (a ArcGIS 10 Desktop addin) helps minimize this response time and provides specific customizable flight path information to the flight staff including maps, coordinates, and azimuths.

  17. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  18. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  19. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  20. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  1. 25 CFR 87.9 - Programming aspects of plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  2. Indiana's Comprehensive Action Plan for Adult Education Programs.

    ERIC Educational Resources Information Center

    Indiana State Dept. of Education, Indianapolis.

    Indiana's Comprehensive Action Plan (I-CAP) provides a framework for program excellence, accountability, and continuous improvement in adult education. The action plan includes guiding principles and benchmarks for quality programs. Adult education programs are evaluated annually on these 10 established principles of program quality: educational…

  3. Solid Waste Assurance Program Implementation Plan

    SciTech Connect

    Irons, L.G.

    1995-06-19

    On June 6, 1995, a waiver to Hanford Site Solid Waste Acceptance Criteria, was approved by the US Department of Energy Richland Operations Office (RL) to replace the low-level, mixed, and transuranic (TRU) generator assessment programs with the Solid Waste Assurance Program (SWAP). This is associated with a waiver that was approved on March 16, 1995 to replace the Storage/Disposal Approval Record (SDAR) requirements with the Waste Specification System (WSS). This implementation plan and the SWAP applies to Solid Waste Disposal (SWD) functions, facilities, and personnel who perform waste acceptance, verification, receipt, and management functions of dangerous, radioactive, and mixed waste from on- and off-site generators who ship to or within the Hanford Site for treatment, storage, and/or disposal (TSD) at SWD TSD facilities.

  4. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    SciTech Connect

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company`s (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees.

  5. Job Search Club Program. Program Notebook. Planning/Operations/Leader's Guide.

    ERIC Educational Resources Information Center

    Boys' Clubs of America, New York, NY.

    Guides are provided for planning, operating, and leading a Job Search Club Program. The planning guide for use by club directors, program committees, and club staff presents a cohesive, systematic plan for launching a successful job search program. It offers a step-by-step description of the essential elements of the planning process, an…

  6. Fact Sheet: Risk Management Plan (RMP) Audit Program

    EPA Pesticide Factsheets

    Risk management programs, which consist of a hazard assessment, a prevention program, and an emergency response program; must be periodically audited to assess whether the plans are adequate or need to be revised to comply with the regulation.

  7. Evaluation plan for the Weatherization Assistance Program

    SciTech Connect

    Beschen, D.A. ); Brown, M.A. )

    1991-08-01

    The most recent national evaluation of the impacts of the US Department of Energy (DOE)'s Weatherization Assistance Program (WAP) was completed in 1984 based on consumption data for households weatherized in 1981. WAP regulations and operations have changed substantially over the last decade, and new opportunities are on the horizon. DOE recognizes the need for a more current national level evaluation of the program and has developed a plan for conducting the evaluation with the support of the Oak Ridge National Laboratory (ORNL). The national WAP evaluation as currently proposed has seven major goals: (1) estimate the energy saved by the program -- one, two, and three years after participation; (2) assess nonenergy impacts, such as comfort, safety, and housing affordability; (3) assess program cost effectiveness; (4) analyze factors which influence energy savings, nonenergy impacts, and cost effectiveness; (5) describe the WAP network's capabilities and the innovative weatherization technologies and procedures it has employed; (6) characterize the WAP-eligible population and the federal and non-federal funds that haven been used to meet its weatherization needs; and, (7) identify promising WAP opportunities for the future. The data collection, analyses, and reports are to be completed in phases between 1991 and 1993. The evaluation methodologies vary by fuel type, housing type, and climate zone. The analysis of energy savings and cost effectiveness will be based primarily on weather-normalized, retrospective utility billing records (collected for pre- and postretrofit years). 12 refs., 8 figs.

  8. Electrician Cluster, STEP Training Plan. Skills Training and Education Program.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Postsecondary Education, Montgomery.

    This guide is a training plan for the electrical skills cluster of the Skills Training and Education Program (STEP), an open-entry, open-exit program funded by the Job Training Partnership Act (JTPA). In the STEP training plan, each task has its own lesson plan guide. This manual contains the following information: definitions, instructions for…

  9. Environmental Restoration Quality Program Plan. Environmental Restoration Program

    SciTech Connect

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a ``entral Environmental Restoration Division`` to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization`s objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  10. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true State water management... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State... major elements of the State water management program, which should address but not be limited to:...

  11. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false State water management... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State... major elements of the State water management program, which should address but not be limited to:...

  12. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false State water management... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State... major elements of the State water management program, which should address but not be limited to:...

  13. DOE Hydrogen and Fuel Cells Program Plan (September 2011)

    SciTech Connect

    none,

    2011-09-01

    The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities within the EERE Fuel Cell Technologies Program and the DOE offices of Nuclear Energy, Fossil Energy, and Science.

  14. Program Planning in Two-Year Colleges: A Handbook.

    ERIC Educational Resources Information Center

    Posner, George; And Others

    Part I of this document describes a model for occupational program planning in two-year colleges. The planning process begins with an estimation decision, i.e., whether the program idea is worth investigating. This decision can be divided into seven sub-questions or systems: (1) Identity--what should be the general content of the program? (2)…

  15. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  16. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  17. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  18. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  19. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  20. FY97 Geothermal R&D Program Plan

    SciTech Connect

    1996-09-01

    This is the Sandia National Laboratories Geothermal program plan. This is a DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This one is of special interest for historical work because it contains what seems to be a complete list of Sandia geothermal program publications (citations / references) from about 1975 to late 1996. (DJE 2005)

  1. The Program Data Analysis Plan for Colorado Special Education.

    ERIC Educational Resources Information Center

    Darby, Charles A., Jr.; And Others

    Presented is a Program Data Analysis Plan (PDAP) for the special education program in Colorado designed to serve as a model for other state education agencies in the development of their own analysis plans. The PDAP is a combination of three major components: a list of program management information requirements in the form of questions, the set…

  2. Site support program plan for ICF Kaiser Hanford Company

    SciTech Connect

    Dieterle, S.E.

    1996-09-27

    The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.

  3. Quality assurance program plan for radionuclide airborne emissions monitoring

    SciTech Connect

    Boom, R.J.

    1995-12-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of radiological airborne emissions. This Quality Assurance Program Plan is prepared in accordance with and to written requirements.

  4. Robot trajectory planning via dynamic programming

    SciTech Connect

    Dohrmann, C.R.; Robinett, R.D.

    1994-03-01

    The method of dynamic programming is applied to three example problems dealing with robot trajectory planning. The first two examples involve end-effector tracking of a straight line with rest-to-rest motions of planar two-link and three-link rigid robots. These examples illustrate the usefulness of the method for producing smooth trajectories either in the presence or absence of joint redundancies. The last example demonstrates the use of the method for rest-to-rest maneuvers of a single-link manipulator with a flexible payload. Simulation results for this example display interesting symmetries that are characteristic of such maneuvers. Details concerning the implementation and computational aspects of the method are discussed.

  5. Planning for Life: Developing and Recognizing Exemplary Career Planning Programs. A Resource Guide for Counselors.

    ERIC Educational Resources Information Center

    Dahir, Carol, Ed.

    Recognizing the importance of the need for effective career planning, the United States Army, in conjunction with the Council of Economic Development, conducted a forum to focus on this issue. What emerged was a program called Planning for Life, which annually recognizes outstanding career planning programs at the state and national level. The…

  6. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the...

  7. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the...

  8. Improving the Army Planning, Programming, Budgeting, and Execution System (PPBES) The Planning Phase

    DTIC Science & Technology

    2000-01-01

    In 1997 the Army asked that RAND Arroyo Center assist in the reengineering of The Army Plan (TAP). The Army also reinstituted strategic planning and...the product was the Army Strategic Planning Guidance (ASPG), which provides strategic guidance to TAP. Planning and programming in the Army are

  9. U.S. Department of Education FY 1999 Annual Plan, Volume 2: Program Performance Plans.

    ERIC Educational Resources Information Center

    Department of Education, Washington, DC.

    The Government Performance and Results Act of 1993 called for the U.S. Department of Education to prepare an Annual Performance Plan which links the Department's budget request with its Strategic Plan. To meet that directive, Volume 2 of the Department's Strategic Plan for 1999 is presented here. It includes the program performance plans that…

  10. Building Technologies Program Multi-Year Program Plan Research and Development 2008

    SciTech Connect

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for research and development, including residential and commercial integration, lighting, HVAC and water heating, envelope, windows, and analysis tools.

  11. Solar index generation and delivery. Program plan

    SciTech Connect

    Lantz, L J

    1980-02-01

    The Solar Index, or, more completely defined as the Service Hot Water Solar Index, was conceptualized during the spring of 1978 with direction from a US Government interoffice agency committee, headed by the Department of Energy. The purpose was to enhance public awareness to solar energy usability. Basically, the Solar Index represents the percentage of energy that solar would provide in order to heat an 80 gallon service hot water load for a given location and day. The Index is computer by utilizing SOLCOST, a computer program, which also has applications to space heating, cooling, and heat pump systems and which supplies economic analyses for such solar energy systems. The Index is generated for approximately 75 geographic locations in the country on a daily basis. The definition of the Index, how the project came to be, what it is at the present time and a plan for the future are described. Also presented are the models used for the generation of the Index, a discussion of the primary tool of implementation (the SOLCOST program) and future efforts.

  12. GSG-GIS development program plan

    SciTech Connect

    Lee, R.C.

    1992-10-15

    For the past 40 years, the Savannah River Site (SRS) has been subjected to numerous geological and geotechnical investigations in support of facility construction and waste site development and remediation. Over this period,.a variety of different subcontractors have collected large quantities of geoscience data. In addition, current programs involve numerous investigators from different departments, and consequently, earth science data and interpretations are scattered among the departments, investigators, and subcontractors at SRS. As a result, scientific and management decisions cannot take advantage of the significant body of information that exists at SRS. Recent DOE Orders (Systematic Evaluation Program, 1991) have put specific requirements on their contractors to compile geological databases to coordinate DOE site data gathering and interpretations, and to assist in compiling safety analysis reports. The Earth Science Advisory Committee and the Environmental Advisory Committee have also made specific recommendations on the management of SRS geoscience data. This plan describes a management system to identify, communicate, and compile SRS geological (including geohydrologic), seismological, and geotechnical (656) data and interpretations on a Geographic Information System (GIS).

  13. Regional monitoring program for the Galveston Bay plan. Final report

    SciTech Connect

    Lane, W.G.

    1994-11-01

    National Estuary Program guidance requires the development of a detailed Environmental Monitoring Plan, as a separate support document to be submitted as a supplement to The Galveston Bay Plan. The two major goals for monitoring work as defined in EPA guidance are: (1) to measure the effectiveness of the management plan`s actions and objectives; and (2) to provide essential information that can be used to redirect and focus actions implemented under The Plan as they are actually carried out.

  14. Planning for Life. A Compendium of Nationally Recognized Career Planning Programs.

    ERIC Educational Resources Information Center

    National Consortium of State Career Guidance Supervisors, Columbus, OH.

    This compendium, which is designed to provide readers with a variety of career planning (CP) program ideas, contains abstracts summarizing 10 elementary, middle, and high school CP programs identified as exemplary by a national review team. Explained in chapter 1 are the primary objectives of the Planning for Life program, which is jointly…

  15. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  16. Review of NASA's Planned Mars Program

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The exploration of Mars has long been a prime scientific objective of the U.S. planetary exploration program. Yet no U.S. spacecraft has successfully made measurements at Mars since the Viking missions of the late 1970s. Mars Observer, which was designed to conduct global observations from orbit, failed just before orbit insertion in 1993. The Russian spacecraft Phobos 2 did succeed in making some observations of the planet in 1989, but it was designed primarily to observe Phobos, the innermost satellite of Mars; the spacecraft failed 2 months after insertion into Mars orbit during the complex maneuvers required to rendezvous with the martian satellite. In fall 1996 NASA plans to launch Mars Pathfinder for a landing on the martian surface in mid-1997. This spacecraft is one of the first two missions in NASA's Discovery program that inaugurates a new style of planetary exploration in which missions are low-cost (less than $150 million) and have very focused science objectives. As can be seen in the comparative data presented in Box 1, this mission is considerably smaller in terms of cost, mass, and scope than NASA's previous Mars missions. NASA's FY 1995 budget initiated a continuing Mars exploration program, called Mars Surveyor, that involves multiple launches of spacecraft as small as or smaller than Mars Pathfinder to Mars over the next several launch opportunities, which recur roughly every 26 months. The first mission in the program, Mars Global Surveyor, set for launch late in 1996, is intended to accomplish many of the objectives of the failed Mars Observer. Like the Discovery program, Mars Surveyor is a continuing series of low-cost missions, each of which has highly focused science objectives. See Box 1 for comparative details of those Surveyor missions currently defined. Around the same time that the Mars Surveyor series was chosen as the centerpiece of NASA's solar system exploration program, the Committee on Planetary and Lunar Exploration (COMPLEX

  17. Endocrine Disruptor Screening Program (EDSP) Comprehensive Management Plans

    EPA Pesticide Factsheets

    The EDSP Comprehensive Management Plan describes the technical review processes that will be used in implementing this program and how the agency intends to factor technology advancements into the program.

  18. QA program plan plutonium stabilization and handling project W-460

    SciTech Connect

    SCHULTZ, J.W.

    1999-09-02

    This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460.

  19. 7 CFR 1215.40 - Programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... PROMOTION, RESEARCH, AND CONSUMER INFORMATION Popcorn Promotion, Research, and Consumer Information Order Promotion, Research, Consumer Information, and Industry Information § 1215.40 Programs, plans, and projects... appropriate programs for promotion, research, consumer information, and industry information with respect...

  20. NASA Year 2000 (Y2K) Program Plan

    NASA Technical Reports Server (NTRS)

    1998-01-01

    NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.

  1. Exploration Technology Program plans and directions

    NASA Astrophysics Data System (ADS)

    Aldrich, A.; Rosen, R.; Craig, M.; Mankins, J. C.

    During the first part of the next century, the United States will return to the Moon to create a permanent lunar base, and, before the year 2019, we will send a human mission to Mars. In addition to these human operations, the Space Exploration Initiative will integrally incorporate robotic lunar and Mars missions. In achieving these efforts to expand human presence and activity in space and also exerted and frontiers of human knowledge, the SEI will require an array of new technologies. Mission architecture definition is still underway, but previous studies indicate that the SEI will require developments in areas such as advanced engines for space transportation, in-space assembly and construction to support permanent basing of exploration systems in space, and advanced surface operations capabilities including adequate levels of power and surface roving vehicles, and technologies to support safely long-duration human operations in space. Plans are now being put into place to implement an Exploration Technology Program (ETP) which will develop the major technologies needed for SEI. In close coordination with other ongoing U.S. government research and development efforts, the ETP will provide in the near term clear demonstrations of potential exploration technologies, research results to support SEI architecture decisions, and a foundation of mature technology that is ready to be applied in the first round of SEI missions. In addition to the technology needed for the first round of SEI missions, the ETP will also put in place a foundation of research for longer-term technology needs—ultimately leading the human missions to Mars. The Space Exploration Initiative and the Exploration Technology Program will challenge the best and the brightest minds across government, industry and academia, inspiring students of all ages and making possible future terrestial applications of SEI technologies that may create whole new industries for the future.

  2. Emergency Planning and Right to Know Programs

    EPA Pesticide Factsheets

    Describes how the Emergency Planning and Community Right-to-Know Act (EPCRA) improves community access to information about chemical hazards and facilitates the development of chemical emergency response plans by tribal governments.

  3. Planning for Career Education Programs: Guidelines for Local Planners.

    ERIC Educational Resources Information Center

    Iowa State Dept. of Public Instruction, Des Moines. Div. of Career Education.

    The guidelines for planning career education programs revolve around gathering valid and comprehensive data. The career education planning model involves determining people's needs, available resources, and alternatives; establishing policies and practices; writing objectives and plans; and evaluating the results. The document, in outline form,…

  4. Method and the Muse: Planning a School Arts Program.

    ERIC Educational Resources Information Center

    Burgard, Ralph

    The document stresses that planning is essential to introduce arts programs into the schools and provides suggestions for the planning process. Elements of a good planning process include clearly stated goals and objectives, efficient use of existing resources, a survey of local conditions, involvement of influential school officials and community…

  5. Well-planning programs give students field-like experience

    SciTech Connect

    Sifferman, T.R.; Chapman, L.

    1983-01-01

    The University of Tulsa recently was given a package of computer well planning and drilling programs that will enable petroleum engineering students to gain valuable experience in designing well programs while still in school. Comprehensive homework assignments are now given in areas of drilling fluids programing, hydraulics, directional wells and surveying. Additional programs are scheduled for next semester.

  6. Program Master Plan: Federal Center for Correctional Research.

    ERIC Educational Resources Information Center

    Groder, Martin G.; Brewer, R. D.

    This revised yet still preliminary version of the Program Master Plan introduces the program with regard to location, physical characteristics, population characteristics, organizational structure and staffing patterns, and a statement of the mission for both the Mental Health and Correctional Program Units. Program principles are listed both…

  7. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Updated program plans and budgets. 603.885 Section 603.885... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision... effort and a revised budget if there is a significant change from the initial budget....

  8. OCCUPATIONAL EDUCATION--PLANNING AND PROGRAMMING. VOLUME TWO.

    ERIC Educational Resources Information Center

    KOTZ, ARNOLD

    ADDITIONAL POSITION PAPERS BASED ON INFORMATION GATHERED IN THE RECONNAISSANCE SURVEYS OF PLANNING AND PROGRAMING IN OCCUPATIONAL EDUCATION, REPORTED IN VOLUME ONE (VT 005 041), ARE PRESENTED. PART IV, CONCERNED WITH PROGRAM STRUCTURE AND BUDGETING AND THEIR RELATION TO THE PLANNING PROCESS, INCLUDES THE PAPERS--(1) "CURRENT POLICIES AND…

  9. How to Plan an Effective School Communications Program.

    ERIC Educational Resources Information Center

    St. John, Walter

    1983-01-01

    Describes in sequence the key considerations involved in planning an effective program for communications among a school's staff members. Covers program goals, communications needs analysis, responsibility, credibility, communications rights of employees, necessary attitudes, planning steps, appropriate channels and network patterns,…

  10. An Aid for Planning Programs in Career Education.

    ERIC Educational Resources Information Center

    Illinois State Board of Vocational Education and Rehabilitation, Springfield. Div. of Vocational and Technical Education.

    Offered as an aid for developing sequential occupational education programs, the publication presents a concept in career education planning beginning with kindergarten and continuing through adult years. Career education goals are defined, and steps in planning sequential programs are outlined as follows: (1) organization of the occupational…

  11. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 1 2014-01-01 2014-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  12. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  13. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 1 2013-01-01 2013-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  14. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 1 2012-01-01 2012-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  15. 7 CFR 22.304 - Multiyear planning and programming.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and...

  16. 49 CFR 236.905 - Railroad Safety Program Plan (RSPP).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad Safety Program Plan (RSPP). 236.905 Section 236.905 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... for Processor-Based Signal and Train Control Systems § 236.905 Railroad Safety Program Plan (RSPP)....

  17. 49 CFR 236.905 - Railroad Safety Program Plan (RSPP).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad Safety Program Plan (RSPP). 236.905 Section 236.905 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... for Processor-Based Signal and Train Control Systems § 236.905 Railroad Safety Program Plan (RSPP)....

  18. 49 CFR 236.905 - Railroad Safety Program Plan (RSPP).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad Safety Program Plan (RSPP). 236.905 Section 236.905 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... for Processor-Based Signal and Train Control Systems § 236.905 Railroad Safety Program Plan (RSPP)....

  19. Operational Environmental Monitoring Program Quality Assurance Project Plan

    SciTech Connect

    Perkins, C.J.

    1994-08-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and operational environmental monitoring performed by Westinghouse Hanford Company as it implements the Operational Environmental Monitoring program. This plan applies to all sampling and monitoring activities performed by Westinghouse Hanford Company in implementing the Operational Environmental Monitoring program at the Hanford Site.

  20. Program Planning: The Neglected Dimension of Service-Learning

    ERIC Educational Resources Information Center

    Sandmann, Lorilee R.; Kiely, Richard C.; Grenier, Robin S.

    2009-01-01

    While service-learning has distinguished itself in the literature as a problem-based experiential alternative to dominant classroom-based, subject-centered pedagogies, there is a strange absence of research based on program planning theory. This work introduces program planning theory to the field of service-learning and reports findings from a…

  1. Planning Student Flow with Linear Programming: A Tunisian Case Study.

    ERIC Educational Resources Information Center

    Bezeau, Lawrence

    A student flow model in linear programming format, designed to plan the movement of students into secondary and university programs in Tunisia, is described. The purpose of the plan is to determine a sufficient number of graduating students that would flow back into the system as teachers or move into the labor market to meet fixed manpower…

  2. 77 FR 52614 - Pre-Existing Condition Insurance Plan Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... HUMAN SERVICES 45 CFR Part 152 RIN 0938-AQ70 Pre-Existing Condition Insurance Plan Program AGENCY... regarding program eligibility to the interim final regulation implementing the Pre- Existing Condition Plan... provide immediate access to coverage for eligible uninsured Americans with pre-existing...

  3. National Civil Applications Program: strategic plan vision for 2005

    USGS Publications Warehouse

    ,

    2004-01-01

    The National Mapping Division (NMD) has developed this comprehensive strategic plan to chart the course of the National Civil Applications Program (NCAP) over the next 5 years. To meet the challenges of the future, the NCAP is changing its program emphases, methods of responding to customer needs, and business practices. The NCAP Strategic Plan identifies the new direction for the program through a series of strategic thrusts and goals for managers to use in formulating plans, establishing program emphases, and determining resource needs and allocations.

  4. A Plan for Developing a Need Responsive Five Year Program Plan and a Handbook for Systematic Program Development and Monitoring.

    ERIC Educational Resources Information Center

    Goddu, Roland

    This document outlines the steps necessary for the development and implementation of a five-year plan for an educational system. It first presents a framework for a five year program plan which includes a yearly statement of the goals of the organization, review or evaluation of the program, a yearly statement of priorities, determination of…

  5. Developmental Training Program: Individual Educational Plan/Individual Transitional Plan.

    ERIC Educational Resources Information Center

    Educational Service Unit #9, Hastings, NE.

    The curriculum model and implementation procedures outlined in this manual for the Developmental Training Program for students with disabilities are based on two trends: the emphasis upon teaching functional skills in the natural environment and the need for educational programs which demonstrate measurability, reportability, and accountability.…

  6. Developmental Training Program: Individual Educational Plan/Individual Transitional Plan.

    ERIC Educational Resources Information Center

    Educational Service Unit #9, Hastings, NE.

    The curriculum model and implementation procedures outlined in this manual for the Developmental Training Program for students with disabilities are based on two trends: the emphasis upon teaching functional skills in the natural environment and the need for educational programs which demonstrate measurability, reportability, and accountability.…

  7. History of the Chinese Family Planning program: 1970-2010.

    PubMed

    Wang, Cuntong

    2012-06-01

    China launched a nationwide family planning program offering birth control methods and family planning services in the 1970s. Promotion of the widespread use of long-term contraceptive methods has been one of the program's core strategies. This paper reviews the history of China's Family Planning Program at the national level from 1970 to 2010. Special attention is paid to the history of contraception policy. This study provides an overview of the last four decades of the Chinese Family Planning Program. Programmatic goals are highlighted during different time periods, with special attention being paid to the role of contraceptive use and the history of contraceptive policy. The Chinese Family Planning Program has experienced several transitions. It has evolved from the 1970s period of moderate policy, represented by wan, xi, shao (late marriage and childbearing, birth spacing and limited fertility), through the strict one-child policy of 1979 to the early 1990s. From the mid-1990s to the present, a relatively lenient policy has been in force, characterized by client-centered informed choice. The success of the Chinese Family Planning Program has long been heavily dependent on policies advocated by the central government, including programs promoting contraception to reduce fertility rates. The Program also depended on a logistical support system, including organizational safeguards and free provision of contraception and family planning services. Copyright © 2012 Elsevier Inc. All rights reserved.

  8. Student Academic Achievement Plan: An Assessment Plan and Program. Revised.

    ERIC Educational Resources Information Center

    Front Range Community Coll., Westminster, CO.

    This report describes student academic achievement assessment activities at Front Range Community College (FRCC) (Colorado). According to this plan, all major decisions within the college will be based on four strategic initiatives: quality of student experience; excellence of human resources; college flexibility and responsibility; and…

  9. Planning a Program of School Plant Construction. Research Report, School Plant Planning Series.

    ERIC Educational Resources Information Center

    Utah State Board of Education, Salt Lake City.

    The importance of long-term planning, and undesirable conditions resulting from failure to plan, are stressed. General procedures named as essential are--(1) the official approval of the Board of Education before the administration proceeds with long-range planning, (2) the design of the school plant around the educational program it is to serve,…

  10. The NASA Space Station program plans

    NASA Technical Reports Server (NTRS)

    Freitag, R. F.

    1984-01-01

    The design of a permanently manned space station is discussed. The role of the space shuttle, planning guidelines, international cooperation, and commercial possibilities are among the topics discussed.

  11. Sandia wind program FY94 annual operating plan

    SciTech Connect

    Dodd, H.M.

    1993-10-01

    This document presents the objectives, accomplishments and activity plan for the Sandia Wind Energy Technology Program. The status of the current program is summarized and the planned FY94 activities are defined. Appendices detailing the cost, performance and schedule associated with these activities are also included. Funding requirements are given for several scenarios in order to reflect the impact of funding variability on program progress.

  12. Program Plan: field radionuclide migration studies in Climax granite

    SciTech Connect

    Isherwood, D.; Raber, E.; Coles, D.; Stone, R.

    1980-11-01

    This Program Plan describes the field radionuclide migration studies we plan to conduct in the Climax granite at the Nevada Test Site. Laboratory support studies are included to help us understand the geochemical and hydrologic processes involved in the field. The Program Plan begins with background information (Section 1) on how this program fits into the National Waste Terminal Storage Program Plan and discusses the needs for field studies of this type. The objectives stated in Section 2 are in direct response to these needs, particularly the need to determine whether laboratory studies accurately reflect actual field conditions and the need for field testing to provide a data base for verification of hydrologic and mass transport models. The technical scope (Section 3) provides a work breakdown structure that integrates the various activities and establishes a base for the technical approach described in Section 4. Our approach combines an interactive system of field and laboratory migration experiments with the use of hydrologic models for pre-test predictions and data interpretation. Section 5 on program interfaces identifies how information will be transferred to other related DOE projects. A schedule of activities and major milestones (Section 6) and the budget necessary to meet the project objectives (Section 7) are included in the Program Plan. Sections 8 and 9 contain brief descriptions of how the technical and program controls will be established and maintained and an outline of our quality assurance program. This program plan is an initial planning document and provides a general description of activities. An Engineering Test Plan containing detailed experimental test plans, an instrumentation plan and equipment design drawings will be published as a separate document.

  13. Light Water Reactor Sustainability Program Integrated Program Plan

    SciTech Connect

    George Griffith; Robert Youngblood; Jeremy Busby; Bruce Hallbert; Cathy Barnard; Kathryn McCarthy

    2012-01-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline - even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy's Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans.

  14. Public Relations for Brazilian Libraries: Process, Principles, Program Planning, Planning Techniques and Suggestions.

    ERIC Educational Resources Information Center

    Kies, Cosette N.

    A brief overview of the functions of public relations in libraries introduces this manual, which provides an explanation of the public relations (PR) process, including fact-finding, planning, communicating, evaluating, and marketing; some PR principles; a 10-step program that could serve as a model for planning a PR program; a discussion of PR…

  15. Computer Applications Planning. A Guide to Planning and Implementing a District-Wide Computer Program.

    ERIC Educational Resources Information Center

    Mojkowski, Charles

    Designed to help school districts move from exploring the use of computers in the classroom to the comprehensive planning and development of computer education programs, this guide is organized around five steps essential to the process of developing a district program. Phase 1 includes the following preliminary activities involved in planning for…

  16. Active Sites Environmental Monitoring Program: Program plan. Revision 1

    SciTech Connect

    Ashwood, T.L.; Wickliff, D.S.; Morrissey, C.M.

    1992-02-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of transuranic (TRU) waste and active low-level waste (LLW) facilities at Oak Ridge National Laboratory (ORNL) in accordance with US Department of Energy (DOE) Order 5820.2A. Active LLW facilities in Solid Waste Storage Area (SWSA) 6 include Tumulus I and Tumulus II, the Interim Waste Management Facility (IWMF), LLW silos, high-range wells, asbestos silos, and fissile wells. The tumulus pads and IWMF are aboveground, high-strength concrete pads on which concrete vaults containing metal boxes of LLW are placed; the void space between the boxes and vaults is filled with grout. Eventually, these pads and vaults will be covered by an engineered multilayered cap. All other LLW facilities in SWSA 6 are below ground. In addition, this plan includes monitoring of the Hillcut Disposal Test Facility (HDTF) in SWSA 6, even though this facility was completed prior to the data of the DOE order. In SWSA 5 North, the TRU facilities include below-grade engineered caves, high-range wells, and unlined trenches. All samples from SWSA 6 are screened for alpha and beta activity, counted for gamma-emitting isotopes, and analyzed for tritium. In addition to these analytes, samples from SWSA 5 North are analyzed for specific transuranic elements.

  17. Planning Programming Budgeting Systems: PPBS and Education.

    ERIC Educational Resources Information Center

    Katzenbach, Edward L.

    Continuous change in education is requiring educational administrators to plan for the distant future with as much precision as they now do for the immediate future. Recently, major advances in the planning-budgeting process have become available to educators in the form of PPBS. Fiduciary budgets, which have been used in most schools since the…

  18. Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan

    NASA Technical Reports Server (NTRS)

    Smith, Janice F. (Compiler); Forrest, Larry

    1993-01-01

    A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.

  19. Timber management planning with timber ram and goal programming

    Treesearch

    Richard C. Field

    1978-01-01

    By using goal programming to enhance the linear programming of Timber RAM, multiple decision criteria were incorporated in the timber management planning of a National Forest in the southeastern United States. Combining linear and goal programming capitalizes on the advantages of the two techniques and produces operationally feasible solutions. This enhancement may...

  20. Program Planning for Research Libraries in a University Setting.

    ERIC Educational Resources Information Center

    Mason, Thomas R.

    The Planning-Programing-Budgeting System (PPBS) uses techniques of systems analysis, cost-benefit analysis, and program budgeting in the administration of large, complex organizations. Some university administrators hope to improve their institutions' internal management through the PPBS approach. The basic program categories of the university are…

  1. FFTF-cycle 10 program and future plan

    NASA Astrophysics Data System (ADS)

    Kohyama, Akira

    1988-04-01

    Brief outlines are provided of the FFTF cycle 10 program and future plans in consideration. The primary objective of the Japan-US collaboration program is to enable predictions of material behavior in MFRs to be made from data obtained in other irradiation environments. Major program goals are outlined.

  2. Individualized Program Planning (IPP): ECS to Grade 12. Programming for Students with Special Needs

    ERIC Educational Resources Information Center

    Online Submission, 2006

    2006-01-01

    This resource is a revision of the teaching resource Individualized Program Plans (1995), Book 3 (ED392232) in the Programming for Students with Special Needs series. It aims to create a bridge between the product, the process and the underlying vision of Individualized Program Planning (IPP). The Standards for Special Education (Amended June…

  3. Review of NASA's Planned Mars Program

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Contents include the following: Executive Summary; Introduction; Scientific Goals for the Exploration of Mars; Overview of Mars Surveyor and Others Mars Missions; Key Issues for NASA's Mars Exploration Program; and Assessment of the Scientific Potential of NASA's Mars Exploration Program.

  4. Definition of space shuttle program plan, study

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The preliminary definition of an economical space shuttle program in which the evolution to full operational capability is achieved through phased subsystem development is presented. The following aspects of the program are discussed: (1) definition of system and subsystem configurations, (2) definition of phased evolution to final configuration, (3) analysis of design, test, cost, and schedule requirements, (4) definition of candidate booster designs and programs to facilitate selection, and (5) definition of program, system, and vehicle requirements.

  5. A GUIDE FOR HEALTH TECHNOLOGY PROGRAM PLANNING.

    ERIC Educational Resources Information Center

    KAHLER, CAROL; AND OTHERS

    THIS GUIDE TO THE PREPARATION OF A 2-YEAR COLLEGE PROGRAM IN HEALTH TECHNOLOGY LISTS CERTAIN NECESSARY PRE-CONDITIONS. BEFORE THE COURSE CAN BE ESTABLISHED, THE ADMINISTRATION MUST (1) DEFINE THE SCOPE OF THE PROGRAM, (2) BE AWARE OF ACCEPTED STANDARDS FOR TECHNICIANS IN THE HEALTH FIELD, (3) NOTE THE POSSIBLE IMPACT OF THE PROGRAM ON THE…

  6. Planning Evaluation through the Program Life Cycle

    ERIC Educational Resources Information Center

    Scheirer, Mary Ann; Mark, Melvin M.; Brooks, Ariana; Grob, George F.; Chapel, Thomas J.; Geisz, Mary; McKaughan, Molly; Leviton, Laura

    2012-01-01

    Linking evaluation methods to the several phases of a program's life cycle can provide evaluation planners and funders with guidance about what types of evaluation are most appropriate over the trajectory of social and educational programs and other interventions. If methods are matched to the needs of program phases, evaluation can and should…

  7. Planning Evaluation through the Program Life Cycle

    ERIC Educational Resources Information Center

    Scheirer, Mary Ann; Mark, Melvin M.; Brooks, Ariana; Grob, George F.; Chapel, Thomas J.; Geisz, Mary; McKaughan, Molly; Leviton, Laura

    2012-01-01

    Linking evaluation methods to the several phases of a program's life cycle can provide evaluation planners and funders with guidance about what types of evaluation are most appropriate over the trajectory of social and educational programs and other interventions. If methods are matched to the needs of program phases, evaluation can and should…

  8. HTGR generic technology program plan (FY 80)

    SciTech Connect

    Not Available

    1980-01-01

    Purpose of the program is to develop base technology and to perform design and development common to the HTGR Steam Cycle, Gas Turbine, and Process Heat Plants. The generic technology program breaks into the base technology, generic component, pebble-bed study, technology transfer, and fresh fuel programs. (DLC)

  9. Adaptation Planning for the National Estuary Program

    EPA Pesticide Factsheets

    This document is a resource for coastal communities to start planning to adapt to climate change. It describes elements, such as vulnerability assessments and stakeholder outreach, and provides examples as well as suggestions for additional resources.

  10. Solar Terrestrial programs: A five year plan

    NASA Technical Reports Server (NTRS)

    Stern, D. P.

    1978-01-01

    Major projects to be initiated in the 1980-1985 period, designed to study the Sun, the heliosphere, Earth's magnetosphere, and the upper atmosphere involve the use of spacelab as well as free flying spacecraft. Current and recent investigations in these areas are reviewed and the guiding principles followed in planning future missions are examined. The implementation strategy, the planning process, and supporting research and technology are discussed.

  11. Light Water Reactor Sustainability Program Integrated Program Plan

    SciTech Connect

    Kathryn McCarthy; Jeremy Busby; Bruce Hallbert; Shannon Bragg-Sitton; Curtis Smith; Cathy Barnard

    2013-04-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

  12. Light Water Reactor Sustainability Program Integrated Program Plan

    SciTech Connect

    McCarthy, Kathryn A.; Busby, Jeremy; Hallbert, Bruce; Bragg-Sitton, Shannon; Smith, Curtis; Barnard, Cathy

    2014-04-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

  13. Civilian radioactive waste management program plan. Revision 2

    SciTech Connect

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  14. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... development of new marketing strategies; to advance the image and desirability of, increase the efficiency of... MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE..., effectuation, administration, and evaluation of programs, plans, and projects for marketing...

  15. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... development of new marketing strategies; to advance the image and desirability of, increase the efficiency of... MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE..., effectuation, administration, and evaluation of programs, plans, and projects for marketing...

  16. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... development of new marketing strategies; to advance the image and desirability of, increase the efficiency of... MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE..., effectuation, administration, and evaluation of programs, plans, and projects for marketing...

  17. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... development of new marketing strategies; to advance the image and desirability of, increase the efficiency of... MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE..., effectuation, administration, and evaluation of programs, plans, and projects for marketing...

  18. 7 CFR 1209.40 - Programs, plans, and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....40 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE MUSHROOM... Order Promotion, Research, Consumer Information, and Industry Information § 1209.40 Programs, plans,...

  19. 7 CFR 1215.40 - Programs, plans, and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....40 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POPCORN... Promotion, Research, Consumer Information, and Industry Information § 1215.40 Programs, plans, and...

  20. Federal Geothermal Program Plan for Fiscal Year 1983

    SciTech Connect

    1983-03-01

    This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This is a report of the Interagency Geothermal Coordinating Committee (IGCC). (DJE 2005)

  1. 7 CFR 1219.21 - Programs, plans, and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE HASS..., promotion, and information programs, plans, studies, or projects established pursuant to § 1219.50. ...

  2. Revised plans for Hot Dry Rock geothermal program

    SciTech Connect

    Murphy, Hugh D.

    1987-03-10

    This letter is our response to your February 13 letter directing us to respond to Headquarters' request for new HDR program plans. This request was initiated by John E. Mock, CE-342, HQ. Our response is organized as three attachments.

  3. Highly enriched uranium (HEU) storage and disposition program plan

    SciTech Connect

    Arms, W.M.; Everitt, D.A.; O`Dell, C.L.

    1995-01-01

    Recent changes in international relations and other changes in national priorities have profoundly affected the management of weapons-usable fissile materials within the United States (US). The nuclear weapon stockpile reductions agreed to by the US and Russia have reduced the national security requirements for these fissile materials. National policies outlined by the US President seek to prevent the accumulation of nuclear weapon stockpiles of plutonium (Pu) and HEU, and to ensure that these materials are subjected to the highest standards of safety, security and international accountability. The purpose of the Highly Enriched Uranium (HEU) Storage and Disposition Program Plan is to define and establish a planned approach for storage of all HEU and disposition of surplus HEU in support of the US Department of Energy (DOE) Fissile Material Disposition Program. Elements Of this Plan, which are specific to HEU storage and disposition, include program requirements, roles and responsibilities, program activities (action plans), milestone schedules, and deliverables.

  4. Weatherization and Intergovernmental Program - State Energy Program Helps States Plan and Implement Energy Efficiency

    SciTech Connect

    2010-06-01

    State energy offices use SEP funds to develop state plans that identify opportunities for adopting renewable energy and energy efficiency technologies, and implementing programs to improve energy sustainability.

  5. 1997 Operating plan for the Office of International Health Programs

    SciTech Connect

    1996-11-01

    One year ago, the Office of International Health Programs provided you with our 1996 Operating Plan, which defined our ideas and ideals for conducting business in 1996. We have again this year undertaken an intensive planning effort, first reviewing our accomplishments and shortcomings during 1996, and then developing plans and priorities for the upcoming year, taking into account input from customers and outside review panels, and ensuring that the demands on the office have been balanced with anticipated human, financial, and material resources.

  6. Kansas Plan: For Program Planning and Development in Education for the Mentally Retarded.

    ERIC Educational Resources Information Center

    Thorsell, Marguerite; And Others

    The manual of administrative guidelines outlining program organization for the education of the mentally retarded in Kansas presents standards of program organization and operation and plans for implementing specified services for the various levels of mental retardation. Part 1 of the manual, detailing program organization, covers program…

  7. Administering Adult Literacy Programs: The Role of Strategic Planning.

    ERIC Educational Resources Information Center

    Michael, Steve Olu

    In an era of rising public criticism of education and decreasing resources, strategic planning can be a major tool for educational administrators who wish to respond to the increasing challenges their adult literacy programs face. Strategic planning can be defined as a disciplined effort to produce fundamental decisions and actions that shape and…

  8. Modeling a Program Planning Process for Vocational Education.

    ERIC Educational Resources Information Center

    Southeast Community Coll., Lincoln, NE.

    This guide, which derives from planning work at Southeast Community College (Nebraska), is designed to improve the practice of vocational program planning at the postsecondary level. After an overview is provided in the first section, a compilation of seven separate categories is presented which deals with gathering needed information for…

  9. Planning, Conducting, and Documenting Data Analysis for Program Improvement

    ERIC Educational Resources Information Center

    Winer, Abby; Taylor, Cornelia; Derrington, Taletha; Lucas, Anne

    2015-01-01

    This 2015 document was developed to help technical assistance (TA) providers and state staff define and limit the scope of data analysis for program improvement efforts, including the State Systemic Improvement Plan (SSIP); develop a plan for data analysis; document alternative hypotheses and additional analyses as they are generated; and…

  10. A Life Planning Program for the Working Woman.

    ERIC Educational Resources Information Center

    Aanstad, Judy; Borders, DiAnne

    This presentation describes a course, "Lifework Planning," designed to help women evaluate their current job status and plan career changes commensurate with long-range life goals. The framework for the program is self-directed learning, through which women develop coping strategies for change. Participants and leaders make mutual decisions…

  11. Planning, Conducting, and Documenting Data Analysis for Program Improvement

    ERIC Educational Resources Information Center

    Winer, Abby; Taylor, Cornelia; Derrington, Taletha; Lucas, Anne

    2015-01-01

    This 2015 document was developed to help technical assistance (TA) providers and state staff define and limit the scope of data analysis for program improvement efforts, including the State Systemic Improvement Plan (SSIP); develop a plan for data analysis; document alternative hypotheses and additional analyses as they are generated; and…

  12. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Program Management Plans. 385.25 Section 385.25 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation...

  13. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Program Management Plans. 385.25 Section 385.25 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation...

  14. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Program Management Plans. 385.25 Section 385.25 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation...

  15. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Program Management Plans. 385.25 Section 385.25 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation...

  16. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Program Management Plans. 385.25 Section 385.25 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation...

  17. Program Planning Guide for Florida Vocational Home Economics Education.

    ERIC Educational Resources Information Center

    Todd, Larry, Ed.

    The planning guide contains basic materials that are being used in vocational home economics education. Part 1, Program Planning, discusses goals for education in the nation and Florida, homemaking as an inherent component of vocational education, and vocational home economics (guidelines, funding, student organizations, and Florida goals).…

  18. 44 CFR 9.15 - Planning programs affecting land use.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY GENERAL FLOODPLAIN MANAGEMENT AND PROTECTION OF WETLANDS § 9.15 Planning programs affecting land use. The Agency shall take floodplain management into account when formulating or... flood hazards and floodplain management and wetlands protection; and (b) Prescribes planning...

  19. 44 CFR 9.15 - Planning programs affecting land use.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY GENERAL FLOODPLAIN MANAGEMENT AND PROTECTION OF WETLANDS § 9.15 Planning programs affecting land use. The Agency shall take floodplain management into account when formulating or... flood hazards and floodplain management and wetlands protection; and (b) Prescribes planning...

  20. 44 CFR 9.15 - Planning programs affecting land use.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY GENERAL FLOODPLAIN MANAGEMENT AND PROTECTION OF WETLANDS § 9.15 Planning programs affecting land use. The Agency shall take floodplain management into account when formulating or... flood hazards and floodplain management and wetlands protection; and (b) Prescribes planning...

  1. 44 CFR 9.15 - Planning programs affecting land use.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY GENERAL FLOODPLAIN MANAGEMENT AND PROTECTION OF WETLANDS § 9.15 Planning programs affecting land use. The Agency shall take floodplain management into account when formulating or... flood hazards and floodplain management and wetlands protection; and (b) Prescribes planning...

  2. 44 CFR 9.15 - Planning programs affecting land use.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY GENERAL FLOODPLAIN MANAGEMENT AND PROTECTION OF WETLANDS § 9.15 Planning programs affecting land use. The Agency shall take floodplain management into account when formulating or... flood hazards and floodplain management and wetlands protection; and (b) Prescribes planning...

  3. UH-60 Airloads Program - Status and plans

    NASA Technical Reports Server (NTRS)

    Kufeld, Robert M.; Loschke, Paul C.

    1991-01-01

    The present paper addresses the background of the UH-60 Airloads Program, the instrumentation, data requirements, and the development of the data collection and storage systems. An outline of the data points to be collected and detail of data access are presented. The Outside Experiment Program, in which researchers outside of NASA propose potential flight experiments, is described. Attention is given to the development of research systems necessary to conduct the program. Significant improvements in data acquisition, processing, and storage quality are stated as the primary objectives as dictated from lessons learned during past rotor airloads flight research programs.

  4. Integrated Technology Plan for the Civil Space Program, 1991

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The purpose of the Integrated Technology Plan (ITP) is to serve as a strategic plan for the OAST space research and technology (R&T) program, and as a strategic planning framework for other NASA and national participants in advocating and conducting technology developments that support future U.S. civil space missions. The ITP begins with a discussion of the national policy and NASA organization which establishes the overall framework for civil space R&T planning. The second chapter provides a top-level review of the potential users of civil space R&T, their strategic mission plans, and the technologies they have identified as needed to achieve those plans. The overall methodology used to develop a civil space technology strategy is discussed. The technical details of the 1991 strategic plan are described, ending with a review of civil space R&T priorities. The fourth chapter describes how the strategic plan is annually translated into the OAST Space R&T Program, with a summary of the fiscal year 1992 program. The ITP concludes with a discussion of requirements for technology development coordination and strategies for facilitating the transfer of civil space technology to the private sector. Several appendices also are attached that provide further information regarding budget implications of the strategic plan, organizational roles, and other topics.

  5. Planning guidance for the Chemical Stockpile Emergency Preparedness Program

    SciTech Connect

    Shumpert, B.L.; Watson, A.P.; Sorensen, J.H.

    1995-02-01

    This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists to assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.

  6. Tandem mirror thermal barrier experimental program plan

    SciTech Connect

    Coensgen, F.H.; Drake, R.P.; Simonen, T.C.

    1980-01-02

    This report describes an experimental plan for the development of the Tandem Mirror Thermal Barrier. Included is: (1) a description of thermal barrier related physics experiments; (2) thermal barrier related experiments in the existing TMX and Phaedrus experiments; (3) a thermal barrier TMX upgrade; and (4) initiation of investigations of axisymmetric magnetic geometry. Experimental studies of the first two items are presently underway. Results are expected from the TMX upgrade by the close of 1981 and from axisymmetric tandem mirror experiments at the end of 1983. Plans for Phaedrus upgrades are developing for the same period.

  7. Planning and Implementing Health Screening Programs.

    ERIC Educational Resources Information Center

    Webster, Katherine P.

    1980-01-01

    School health screening programs, which include screening, education of children and parents, and follow-up in the form of appropriate treatment, are described. A scoliosis screening program is described as an example of the model presented. Suggestions for planners, participants, and evaluators of any school health screening are summarized. (JMF)

  8. Linear Programming With Applications to Educational Planning.

    ERIC Educational Resources Information Center

    Carman, Robert A.

    This document discusses the value of linear programing in finding minimum and maximum solutions to problems of resource allocation. Three models using this technique are given for the areas of educational finance, school district personnel compensation, and instructional program evaluation. (RA)

  9. Building Technologies Program Multi-Year Program Plan Technology Validation and Market Introduction 2008

    SciTech Connect

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for technology validation and market introduction, including ENERGY STAR, building energy codes, technology transfer application centers, commercial lighting initiative, EnergySmart Schools, EnergySmar

  10. Transuranic Waste Characterization Quality Assurance Program Plan

    SciTech Connect

    1995-04-30

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes.

  11. Quality assurance program plan for radionuclide airborne emissions monitoring

    SciTech Connect

    Boom, R.J.

    1995-03-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of airborne emissions. The Hanford Site radioactive airborne emissions requirements are defined in National Emissions Standards for Hazardous Air Pollutants (NESHAP), Code of Federal Regulations, Title 40, Part 61, Subpart H (EPA 1991a). Reporting of the emissions to the US Department of Energy is performed in compliance with requirements of US Department of Energy, Richland Operations Office Order 5400.1, General Environmental Protection Program (DOE-RL 1988). This Quality Assurance Program Plan is prepared in accordance with and to the requirements of QAMS-004/80, Guidelines and Specifications for Preparing Quality Assurance Program Plans (EPA 1983). Title 40 CFR Part 61, Appendix B, Method 114, Quality Assurance Methods (EPA 1991b) specifies the quality assurance requirements and that a program plan should be prepared to meet the requirements of this regulation. This Quality Assurance Program Plan identifies NESHAP responsibilities and how the Westinghouse Hanford Company Environmental, Safety, Health, and Quality Assurance Division will verify that the methods are properly implemented.

  12. Space shuttle maintenance program planning document

    NASA Technical Reports Server (NTRS)

    Brown, D. V.

    1972-01-01

    A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.

  13. Program planning, chapter 5, part D

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Recommendations for future activities necessary to support satellite microwave sensing are reported. Areas covered include component development, data processing, calibration, design and fabrication of multifrequency systems, and experimental test programs to establish interactions of electromagnetic waves and sensed parameters.

  14. Is Program Planning Just a Ritual?

    ERIC Educational Resources Information Center

    Durfee, Arthur E.

    1976-01-01

    The failure of supervisors to follow through with helpful interest and discussion has had a debilitating impact on too many Extension programs. The accountability aspect is explored using seven questions with which Extension professionals should be concerned. (ABM)

  15. Hazardous materials response project: program plan

    SciTech Connect

    Not Available

    1981-11-01

    The overall purpose of this Program described is to provide timely and effective deployment of scientific resources during an emergency oil or hazardous substance release to minimize environmental and socioeconomic impact.

  16. Inspection Methods in Programming: Cliches and Plans.

    DTIC Science & Technology

    1987-12-01

    PROGRAM ELEMENT. PROJECT. TASK Artificial Inteligence Laboratory AREA & WORK UN IT NUMBERS J 545 Technology Square Cambridge, MA 02139 $L. CONTROLLING...attest, operations on program text, such as concatentat ion and substitution, are in general a quite tricky business . Typical problems in- clude...number I absolute-value normalize: - output:number Compare ureaterum er sserm:number dss -fthan =TIM Fequality-within- tolerance Figure 14. The three

  17. Program Development Plan and Team up

    SciTech Connect

    Solar Electric Power Association

    2001-12-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead.

  18. Performance Assessment Strategy Plan for the Geologic Repository Program

    SciTech Connect

    1990-01-01

    Performance assessment is a major constituent of the program being conducted by the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations to assess compliance with the performance requirements in the regulations for a geologic repository and to support the development of the repository. The strategy for these evaluations has been documented in the Performance Assessment Strategy Plan (DOE, 1989). The implementation of the performance assessment strategy is defined in this document. This paper discusses the scope and objectives of the implementation plan, the relationship of the plan to other program plans, summarizes the performance assessment areas and the integrated strategy of the performance assessment program. 1 fig., 3 tabs.

  19. Geochemical engineering and materials program plan

    SciTech Connect

    1982-08-01

    The Department of Energy (DOE) was designated as lead agency in discharging the overall legislative mandate for federal R&D to assist the private sector in developing appropriate technology for exploiting geothermal energy resources. The Geochemical Engineering and Materials (GEM) Program was conceived, as part of DOE'S overall strategy, to address specific and plant-wide problems and uncertainties in the use of materials and in geochemical engineering. This program assists industry in the conduct of long-term,high-risk R&D needed to overcome the significant technical and economic GEM-related obstacles faced by developers and potential developers of this alternative energy source. The program focuses on: (1) Increasing the knowledge about the properties of materials and their performance under geothermal energy system conditions; (2) Developing and utilizing more reliable and/or cost-effective materials than previously available; and (3) Developing a greater understanding of and control over geochemical processes during fluid production and transport, energy conversion, and waste management. As a stand-alone program and as support to other DOE geothermal technology development programs, the GEM Program contributes to the feasibility of designing and operating efficient, reliable, and safe fluid handling and energy conversion systems.

  20. U.S. Department of Education FY 2000 Annual Plan, Volume 2: Program Performance Plans.

    ERIC Educational Resources Information Center

    Department of Education, Washington, DC.

    This volume of the Department of Education's (ED) annual plan contains the program-performance plans to support efforts to reach the department's four goals. These four goals are as follows: (1) help all students reach challenging academic standards so that they are prepared for responsible citizenship, further learning, and productive employment;…

  1. Teacher Education Programs in Jordan: A Reform Plan

    ERIC Educational Resources Information Center

    Naba'h, Abdallah Abu; Al-Omari, Hamza; Ihmeideh, Fathi; Al-Wa'ily, Suad

    2009-01-01

    The study presents a historical background of teacher education in Jordan and outlines the components of the present teacher education program at Hashemite University. This includes admission policy, academic study plans, practicum programs, selection of cooperative schools, selection of cooperative teachers, stages of training, and assessment of…

  2. Course Length Versus Course Price: Marketing Factors in Program Planning.

    ERIC Educational Resources Information Center

    Lamoureux, Marvin E.

    Recent program planning literature involving adult education has attempted to draw upon techniques from marketing management. Most of the literature has, however, not explored the relationship between adult education program decision needs and fundamental marketing concepts. Adult educators and marketing managers are conducting similar daily…

  3. Teacher Education Programs in Jordan: A Reform Plan

    ERIC Educational Resources Information Center

    Naba'h, Abdallah Abu; Al-Omari, Hamza; Ihmeideh, Fathi; Al-Wa'ily, Suad

    2009-01-01

    The study presents a historical background of teacher education in Jordan and outlines the components of the present teacher education program at Hashemite University. This includes admission policy, academic study plans, practicum programs, selection of cooperative schools, selection of cooperative teachers, stages of training, and assessment of…

  4. TTIP: Texas Teacher Internship Program 1994 Curriculum Implementation Plans.

    ERIC Educational Resources Information Center

    Walenta, Brian T., Ed.

    The Texas Teacher Internship Program (TTIP) is a competitive program for science, technology and mathematics teachers who serve as summer interns at industry and university sites in order to experience real world applications of the subjects they teach. This document contains curriculum implementation plans developed by the teachers to illustrate…

  5. Course Length Versus Course Price: Marketing Factors in Program Planning.

    ERIC Educational Resources Information Center

    Lamoureux, Marvin E.

    Recent program planning literature involving adult education has attempted to draw upon techniques from marketing management. Most of the literature has, however, not explored the relationship between adult education program decision needs and fundamental marketing concepts. Adult educators and marketing managers are conducting similar daily…

  6. The Living with a Star Program Mission Plan

    NASA Technical Reports Server (NTRS)

    Barth, Janet; Day, John (Technical Monitor)

    2001-01-01

    LWS (Living With a Star) is research science focused to facilitate enabling science for spacecraft design (specifically environment specification models) and spacecraft operations (specifically Space Weather research). The following topics are discussed: LWS goals and program, program architecture, the solar dynamic observer, the geospace plan, the space environment testbed concept, and the heliosphere missions.

  7. The Role of Communications in Population and Family Planning Programs.

    ERIC Educational Resources Information Center

    Sweeney, William O.

    In this paper, the author outlines the historical development of information and education programs for population control and family planning, arguing that communications activities should receive as much emphasis as the health services program. The public information aspect includes use of mass media, advertising and promotion, public relations…

  8. Linear Programming for Vocational Education Planning. Interim Report.

    ERIC Educational Resources Information Center

    Young, Robert C.; And Others

    The purpose of the paper is to define for potential users of vocational education management information systems a quantitative analysis technique and its utilization to facilitate more effective planning of vocational education programs. Defining linear programming (LP) as a management technique used to solve complex resource allocation problems…

  9. Personal and Family Financial Planning: Perspectives on Community College Programs.

    ERIC Educational Resources Information Center

    Leo, Robert J.; And Others

    After a brief summary of the findings of a 1979 study of Personal and Family Financial Planning (PFFP) programs at member institutions of the League for Innovation in the Community College (LICC), this two-part monograph provides information on selected PFFP programs. Part I presents in-depth descriptions of the implementation, subject coverage,…

  10. 7 CFR 225.4 - Program management and administration plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Section 225.4 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency... eligible sponsors; (4) The State's plans for monitoring and inspecting sponsors, feeding sites, and food...

  11. 7 CFR 225.4 - Program management and administration plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Section 225.4 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency... eligible sponsors; (4) The State's plans for monitoring and inspecting sponsors, feeding sites, and food...

  12. 7 CFR 225.4 - Program management and administration plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Section 225.4 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency... eligible sponsors; (4) The State's plans for monitoring and inspecting sponsors, feeding sites, and food...

  13. 7 CFR 225.4 - Program management and administration plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Section 225.4 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency... eligible sponsors; (4) The State's plans for monitoring and inspecting sponsors, feeding sites, and food...

  14. Drunk Driving Public Information Program Strategies and Planning Guide.

    ERIC Educational Resources Information Center

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This guide, designed to accompany a videocassette of selected television spots is a compendium of specific drunk driving topics and issues for each of the major planning steps of a public information program. The guide is organized around these steps, which are (1) select program strategies, (2) select target audiences, (3) select media channels,…

  15. Planning the Fire Program for the Third Millennium

    Treesearch

    Richard A. Chase

    1987-01-01

    The fire program planner faces an increasingly complex task as diverse--and often contradictory--messages about objectives and constraints are received from political, administrative, budgetary, and social processes. Our principal challenge as we move into the 21st century is not one of looking for flashier technology to include in the planned fire program. Rather, we...

  16. Oil program implementation plan FY 1996--2000

    SciTech Connect

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  17. Systems engineering implementation plan for the liquid effluents services program

    SciTech Connect

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described.

  18. Successful business planning for new programs in health care organizations.

    PubMed

    Langland-Orban, B; Krasick, E R

    1991-03-01

    Health care organizations implement business strategies through programs and services, and success depends on careful program design and execution. A conscientious design requires thorough efforts in organizing the planning process, conducting the decision analysis, and obtaining approval for a program. Weak methods and processes in the management of these efforts can result in faulty assumptions and costly errors in the development of new health care ventures, thus preventing the achievement of financial and operating goals. This article reviews the stages of business planning, and the points at which success may be impaired.

  19. Planning an Effective Speakers Outreach Program

    NASA Technical Reports Server (NTRS)

    McDonald, Malcolm W.

    1996-01-01

    The National Aeronautics and Space Administration (NASA) and, in particular, the Marshall Space Flight Center (MSFC) have played pivotal roles in the advancement of space exploration and space-related science and discovery since the early 1960's. Many of the extraordinary accomplishments and advancements of NASA and MSFC have gone largely unheralded to the general public, though they often border on the miraculous. This lack of suitable and deserved announcement of these "miracles" seems to have occurred because NASA engineers and scientists are inclined to regard extraordinary accomplishment as a normal course of events. The goal in this project has been to determine an effective structure and mechanism for communicating to the general public the extent to which our investment in our US civilian space program, NASA, is, in fact, a very wise investment. The project has involved discerning important messages of truth which beg to be conveyed to the public. It also sought to identify MSFC personnel who are particularly effective as messengers or communicators. A third aspect of the project was to identify particular target audiences who would appreciate knowing the facts about their NASA investment. The intent is to incorporate the results into the formation of an effective, proactive MSFC speakers bureau. A corollary accomplishment for the summer was participation in the formation of an educational outreach program known as Nasa Ambassadors. Nasa Ambassadors are chosen from the participants in the various MSFC summer programs including: Summer Faculty Fellowship Program (SFFP), Science Teacher Enrichment Program (STEP), Community College Enrichment Program (CCEP), Joint Venture (JOVE) program, and the NASA Academy program. NASA Ambassadors agree to make pre-packaged NASA-related presentations to non-academic audiences in their home communities. The packaged presentations were created by a small cadre of participants from the 1996 MSFC summer programs, volunteering

  20. [Cost-benefit model of the Rwanda family planning program].

    PubMed

    1991-08-01

    Significant conclusions are presented of the application of a cost-benefit model of family planning in Rwanda. The model and computer programs used were developed by the Research Triangle Institute and financed by the US Agency for International Development. The UN Population Fund participated in the project, which represented the 1st application of the model in Africa. Rwanda's population growth is among the most rapid in the world. The population has increased from about 2 million in 1950 to over 7 million in 1989. The model is composed of 2 parts, the 1st of which discloses the scope of the family planning program and its impact on population growth. The resulting projections are the basis for the 2nd module, the actual cost-benefit analysis which measures the impact of family planning on sectorial expenditures and analyzes the costs and benefits of the program in different sectors. The sectors of health, education, and agriculture are included in this presentation. 2 hypotheses about population growth are included; the 1st assumes the current family planning program and the 2nd assumes no family planning program. The model commences with population and family planning data for 1981. Data through 1989 represent observed rates and those for 1990-2011 are target rates. Only modern family planning methods are included in the model. The prevalence rate for modern methods increased from nearly null in 1981 to 5.3% in 1989 and following current trends is projected at 34.8% in 2000 and 46.8% in 2011. The total fertility rate was 8.6 in 1981 and is projected at 5.5 in 2000 and 4.7 in 2011. The total population is projected at 13.2 million in 2011 with a family planning program or 17.7 million without one. Health expenditures in the final year of the projection would be 41% greater without a family planning program. The family planning program would permit a reduction in the number of children to be educated of over 1 million students, a 54% decrease, assuming that the

  1. Near coastal program plan for 1991: Estuaries

    SciTech Connect

    Not Available

    1990-11-01

    Environmental regulatory programs in the United States have been estimated to cost more than $70 billion annually. The Environmental Monitoring and Assessment Program (EMAP) is a nationwide initiative being implemented by EPA's Office of Research and Development (ORD). It was developed in response to the demand for information on the condition of the nation's ecological resources. The goal of EMAP is to assess and document the status and trends in the condition of the nation's forests, wetlands, estuaries, coastal waters, lakes, rivers, and streams, Great Lakes, agricultural lands, and arid lands on an integrated and continuing basis.

  2. Program plan for EMP survivability of Navy C2 systems

    SciTech Connect

    Latorre, V.R.; Greenwell, R.A.

    1986-08-01

    This report provides a plan for implementing the Navy Tactical C2 EMP Survivability Program. This program will emphasize the development of EMP standards and specifications for all phases of a C2 system's life from its concept formulation phase through its total in service life. In order to achieve an EMP survivable Navy C2 system, the US Navy must develop a program that will provide appropriate guidance and direction.

  3. Tanks focus area multiyear program plan - FY96-FY98

    SciTech Connect

    1995-07-01

    The Tanks Focus Area (TFA) Multiyear Program Plan (MYPP) presents the recommended TFA technical program. The recommendation covers a 3-year funding outlook (FY96-FY98), with an emphasis on FY96 and FY97. In addition to defining the recommended program, this document also describes the processes used to develop the program, the implementation strategy for the program, the references used to write this report, data on the U.S. Department of Energy (DOE) tank site baselines, details on baseline assumptions and the technical elements, and a glossary.

  4. Strategic Planning to Improve EHDI Programs

    ERIC Educational Resources Information Center

    White, Karl R.; Blaiser, Kristina M.

    2011-01-01

    Because newborn hearing screening has become the standard of care in the United States, every state has established an early hearing detection and intervention (EHDI) program responsible for establishing, maintaining, and improving the system of services needed to serve children with hearing loss and their families. While significant developments…

  5. Data Driven Program Planning for GIS Instruction

    ERIC Educational Resources Information Center

    Scarletto, Edith

    2013-01-01

    This study used both focus groups (qualitative) and survey data (quantitative) to develop and expand an instruction program for GIS services. It examined the needs and preferences faculty and graduate students have for learning about GIS applications for teaching and research. While faculty preferred in person workshops and graduate students…

  6. Strategy Plan Strengthens Energy Conservation Program.

    ERIC Educational Resources Information Center

    Minning, William R.

    1987-01-01

    The United States Department of Energy's Schools and Hospitals Program has been popular among schools. The necessity of locating nonfederal resources to achieve energy management warrants (1) developing a strategy of evaluation among schools and (2) market research and analysis. (CJH)

  7. Strategic Planning to Improve EHDI Programs

    ERIC Educational Resources Information Center

    White, Karl R.; Blaiser, Kristina M.

    2011-01-01

    Because newborn hearing screening has become the standard of care in the United States, every state has established an early hearing detection and intervention (EHDI) program responsible for establishing, maintaining, and improving the system of services needed to serve children with hearing loss and their families. While significant developments…

  8. Operating and Assurance Program Plan. Revision 4

    SciTech Connect

    Not Available

    1994-07-01

    The LBL Operating and Assurance Program (OAP) is a management system and a set of requirements designed to maintain the level of performance necessary to achieve LBL`s programmatic and administrative objectives effectively and safely through the application of quality assurance and related conduct of operations and maintenance management principles. Implement an LBL management philosophy that supports and encourages continual improvement in performance and quality at the Laboratory. Provide an integrated approach to compliance with applicable regulatory requirements and DOE orders. The OAP is intended to meet the requirements of DOE Order 5700.6C, Quality Assurance. The Program also contains management system elements of DOE Orders 5480.19, Conduct of Operations Requirements for DOE Facilities; 5480.25, Safety of Accelerator Facilities; and 4330.4A, Maintenance Management Program, and is meant to integrate these elements into the overall LBL approach to Laboratory management. The requirements of this program apply to LBL employees and organizations, and to contractors and facility users as managed by their LBL sponsors. They are also applicable to external vendors and suppliers as specified in procurement documents and contracts.

  9. Data Driven Program Planning for GIS Instruction

    ERIC Educational Resources Information Center

    Scarletto, Edith

    2013-01-01

    This study used both focus groups (qualitative) and survey data (quantitative) to develop and expand an instruction program for GIS services. It examined the needs and preferences faculty and graduate students have for learning about GIS applications for teaching and research. While faculty preferred in person workshops and graduate students…

  10. Planning Public Relations Programs for Exceptional Events.

    ERIC Educational Resources Information Center

    McElreath, Mark P.

    This paper discusses Program Management (PM), a decision-making process which uses a diachronic, idea-generating communication mode. Decision making according to a PM model entails obtaining a mandate or authorization, identifying the problem, exploring for knowledge and generating solutions, reviewing proposals and developing resources,…

  11. Planning Management Training Programs for Organizational Development

    ERIC Educational Resources Information Center

    Alpander, Guvenc G.

    1974-01-01

    To investigate means of converting management development programs into a successful organizational development process, managers' attitudes toward centralization and decentralization of functions and decisions, the importance of performed functions, their personal effectiveness, their managerial style, and what they prefer for executive…

  12. The Rural Elderly: Program Planning Guidelines.

    ERIC Educational Resources Information Center

    Coward, Raymond T.; Kerckhoff, Richard K.

    Designed for the rural practitioner, this manual offers a description of the major developmental tasks faced by individuals during the latter part of the life span and a summary of the major implications that research holds for building community programs for the rural elderly. Section II discusses two major assumptions: (1) because human beings…

  13. LSS systems planning and performance program

    NASA Technical Reports Server (NTRS)

    Mckenna, Victoria Jones; Dendy, Michael J.; Naumann, Charles B.; Rice, Sally A.; Weathers, John M.

    1993-01-01

    This report describes, using viewgraphs, the Marshall Space Flight Center's Large Space Structures Ground Test Facilities located in building 4619. Major topics include the Active Control Evaluation of Systems (ACES) Laboratory; the Control-Structures Interaction/Controls, Astrophysics, and Structures Experiment in Space (CSI/CASES); Advanced Development Facility; and the ACES Guest Investigator Program.

  14. Planning and Research for Program Expansion.

    ERIC Educational Resources Information Center

    Greenblatt, Sadelle T.

    Little Brothers--Friends of the Elderly is a non-profit, non-sectarian federation of agencies devoted to meeting the needs of the elderly poor, those poor not merely in worldly goods, but in love. The organization examined how it might more effectively spread its services and assure the establishment throughout the United States of programs with…

  15. The NASA computer science research program plan

    NASA Technical Reports Server (NTRS)

    1983-01-01

    A taxonomy of computer science is included, one state of the art of each of the major computer science categories is summarized. A functional breakdown of NASA programs under Aeronautics R and D, space R and T, and institutional support is also included. These areas were assessed against the computer science categories. Concurrent processing, highly reliable computing, and information management are identified.

  16. Draft SEI Program Plans: 1994-1998

    DTIC Science & Technology

    1993-08-01

    analyzed within a specific area of knowledge and experience. The SEI has developed a feature-oriented domain analysis ( FODA ) method that develops a...Computer Resources Support Improvement Program FAA Federal Aviation Administration FFRDC federally funded research and development center FODA feature

  17. Environmental Restoration Program Roadmap: Strategic program plan. Addendum 1

    SciTech Connect

    1992-12-11

    This Addendum to the Portsmouth (PORTS) Environmental Restoration (ER) Roadmap expands on the FY 1992 strategic plan for PORTS by providing human resource loading, ADS linkages to resolution activities, and technology development information. Each of these topics is presented in a separate section.

  18. Subseabed Disposal Program Plan. Volume I. Overview

    SciTech Connect

    1981-07-01

    The primary objective of the Subseabed Disposal Program (SDP) is to assess the scientific, environmental, and engineering feasibility of disposing of processed and packaged high-level nuclear waste in geologic formations beneath the world's oceans. High-level waste (HLW) is considered the most difficult of radioactive wastes to dispose of in oceanic geologic formations because of its heat and radiation output. From a scientific standpoint, the understanding developed for the disposal of such HLW can be used for other nuclear wastes (e.g., transuranic - TRU - or low-level) and materials from decommissioned facilities, since any set of barriers competent to contain the heat and radiation outputs of high-level waste will also contain such outputs from low-level waste. If subseabed disposal is found to be feasible for HLW, then other factors such as cost will become more important in considering subseabed emplacement for other nuclear wastes. A secondary objective of the SDP is to develop and maintain a capability to assess and cooperate with the seabed nuclear waste disposal programs of other nations. There are, of course, a number of nations with nuclear programs, and not all of these nations have convenient access to land-based repositories for nuclear waste. Many are attempting to develop legislative and scientific programs that will avoid potential hazards to man, threats to other ocean uses, and marine pollution, and they work together to such purpose in meetings of the international NEA/Seabed Working Group. The US SDP, as the first and most highly developed R and D program in the area, strongly influences the development of subseabed-disposal-related policy in such nations.

  19. Planning a Financial Aid Awareness Program.

    ERIC Educational Resources Information Center

    Department of Education, Washington, DC.

    This booklet is intended to be used with a set of slides as part of a presentation to students on "How To Apply for Federal Student Aid." The first part of the book is a script based on the slides. The images displayed on each slide are also provided in the booklet. After the script is a guide to hosting a financial aid information program. The…

  20. Tank farm waste characterization Technology Program Plan

    SciTech Connect

    Hohl, T.M.; Schull, K.E.; Bensky, M.S.; Sasaki, L.M.

    1989-03-01

    This document presents technological and analytical methods development activities required to characterize, process, and dispose of Hanford Site wastes stored in underground waste tanks in accordance with state and federal environmental regulations. The document also lists the need date, current (fiscal year 1989) funding, and estimate of future funding for each task. Also identified are the impact(s) if an activity is not completed. The document integrates these needs to minimize duplication of effort between the various programs involved.

  1. Constance mirror program: Progress and plans

    NASA Technical Reports Server (NTRS)

    Klinkowstein, R. E.; Mauel, M. E.; Irby, J. H.; Smullin, L. D.; Voldman, S. H.

    1981-01-01

    The current state of the mechanics of the Constance II experiment, the physics results gathered, the motivation background, and future plans for the Constance II experiment are reviewed. Several improvements have been made and several experimental investigations have been completed. These include the construction/installation/testing of: (1) liquid-nitrogen cooled, Ioffe bars installed, (2) a diverter coil (3) the 100 kW ICRF generator, (4) the data acquisition system, and (5) the optimum hot-iron operation of the machine with Titanium and pulsed-gas plasma guns. Measurements were made of the density, temperature, and radius of the plasma. Ion-cyclotron fluctuations were observed, their bandwidth measured, and data collected demonstrating resonance heating. New X-ray diagnostics were designed and purchased, and progress on the Thomson scattering was made. Finally, a new hot cathode gun was designed and constructed.

  2. Active microwave users working group program planning

    NASA Technical Reports Server (NTRS)

    Ulaby, F. T.; Bare, J.; Brown, W. E., Jr.; Childs, L. F.; Dellwig, L. F.; Heighway, J. E.; Joosten, R.; Lewis, A. J.; Linlor, W.; Lundien, J. R.

    1978-01-01

    A detailed programmatic and technical development plan for active microwave technology was examined in each of four user activities: (1) vegetation; (2) water resources and geologic applications, and (4) oceanographic applications. Major application areas were identified, and the impact of each application area in terms of social and economic gains were evaluated. The present state of knowledge of the applicability of active microwave remote sensing to each application area was summarized and its role relative to other remote sensing devices was examined. The analysis and data acquisition techniques needed to resolve the effects of interference factors were reviewed to establish an operational capability in each application area. Flow charts of accomplished and required activities in each application area that lead to operational capability were structured.

  3. Site action plan for maintenance management program. Revision D

    SciTech Connect

    Pearson, A.W.

    1993-11-30

    (DOE) Order 4330.4B, ``Maintenance Management Program`` requires each site to develop a Site Action Plan for implementing a Maintenance Management Program. Nonnuclear facilities are required to address the 32 elements of Chapter 1: Guidelines for the Conduct of Maintenance at DOE Nonnuclear Facilities. This document details the degree of implementation for each element, and the Martin Marietta Specialty Components, Inc., plan for implementation of the items which remain to be completed. The original Pinellas Plant Maintenance Management Program Site Action Plan (Issue A) was completed March 27, 1991. The format was modified per DOE request and it was resubmitted as Issue B and approved by AL September 16, 1991. Issue C was submitted, and approved December 20, 1992. The most significant achievement during FY-93 were the implementation of plant wide Graded Approach, and Configuration Control programs. The methodologies for performing these activities were developed, and pilot programs were implemented to verify their effectiveness. Plant wide implementation of both programs is progressing on a high priority basis. The formalized method for grading equipment and facilities provides a basis for establishing uniform, risk based priorities. The risks involved are environment, safety, health and programmatic mission. Other achievements for FY-93, include the establishment of procedures for the decommissioning, and down-grading of facilities, improved work control, improved work performance reporting, improved quality plans, and improved operating procedures.

  4. Program plan, and request for reprogramming first year funds

    SciTech Connect

    Not Available

    1993-02-10

    In June of 1992, the U. S. Department of Energy (DOE) awarded assistance Medical University of South Carolina (MUSC) for the Environmental Hazards Assessment Program, The first year of the program is primarily a planning year. We have aggressively pursued input into the EHAP program to begin to understand where our efforts fit within other efforts underway nationally. We have also begun some direct activities at MUSC to begin the program. Part of this report is devoted to informing DOE of what we have accomplished so far this year. In our efforts to plan, we have identified several changes in emphasis for the program. These changes affect the original plan in terms of projected milestones and budget allocations. Part of this report describes these changes and describes the proposed changes to the budget. We are not requesting additional funds for this year. Simply, we are requesting some change in allocations to budget categories. Therefore, our report to DOE is a combination status report, program plan, and request for reallocation of budget.

  5. Hanford Site waste minimization and pollution prevention awareness program plan

    SciTech Connect

    Place, B.G.

    1998-09-24

    This plan, which is required by US Department of Energy (DOE) Order 5400. 1, provides waste minimization and pollution prevention guidance for all Hanford Site contractors. The plan is primary in a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, Prime contractor implementation plans, and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation (DOE-RL, 1997a) describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Items discussed include the pollution prevention policy and regulatory background, organizational structure, the major objectives and goals of Hanford Site`s pollution prevention program, and an itemized description of the Hanford Site pollution prevention program. The document also includes US Department of Energy, Richland Operations Office`s (RL`s) statement of policy on pollution prevention as well as a listing of regulatory drivers that require a pollution prevention program.

  6. Integrated High Payoff Rocket Propulsion Technologies Program Material Development Plan

    NASA Technical Reports Server (NTRS)

    Clinton, R. G., Jr.; Stropki, M.; Cleyrat, D.; Stucke, B.; Phillips, S.; Reed, B.

    2001-01-01

    In this viewgraph presentation, IMWG (IHPRPT Materials Working Group) government and industry members, together with the IHPRPT (Integrated High Payoff Rocket Propulsion Technologies Program Material Development Plan) National Component Leads, have developed a materials plan to address the critical needs of the IHPRPT community: (1) liquids boost and orbit transfer; (2) solids boost and orbit transfer; (3) tactical propulsion; and (4) spacecraft propulsion. Criticality of materials' role in achieving IHPRPT goals is evidenced by the significant investment over the next five years.

  7. United State space programs - Present and planned

    NASA Technical Reports Server (NTRS)

    Frosch, R. A.

    1978-01-01

    The U.S. space program is considered with reference to the benefits derived by the public. Missions are divided into three categories: the use of near-earth space for remote sensing, communications, and other purposes directly beneficial to human welfare; the scientific exploration of the solar system and observation of the universe as part of the continuing effort to understand the place of earth and man in the cosmos; and the investigation of the sun-earth relationships which are basic to the terrestrial biosphere. Individual projects are described, and it is suggested that the future of space technology in 1978 is comparable to the future of aviation in 1924.

  8. United State space programs - Present and planned

    NASA Technical Reports Server (NTRS)

    Frosch, R. A.

    1978-01-01

    The U.S. space program is considered with reference to the benefits derived by the public. Missions are divided into three categories: the use of near-earth space for remote sensing, communications, and other purposes directly beneficial to human welfare; the scientific exploration of the solar system and observation of the universe as part of the continuing effort to understand the place of earth and man in the cosmos; and the investigation of the sun-earth relationships which are basic to the terrestrial biosphere. Individual projects are described, and it is suggested that the future of space technology in 1978 is comparable to the future of aviation in 1924.

  9. WASTE CERTIFICATION PROGRAM PLAN - REVISION 7

    SciTech Connect

    MORGAN, LK

    2002-01-08

    The primary changes that have been made to this revision reflect the relocation of the Waste Certification Official (WCO) organizationally from the Quality Services Division (QSD) into the Laboratory Waste Services (LWS) Organization. Additionally, the responsibilities for program oversight have been differentiated between the QSD and LWS. The intent of this effort is to ensure that those oversight functions, which properly belonged to the WCO, moved with that function; but retain an independent oversight function outside of the LWS Organization ensuring the potential for introduction of organizational bias, regarding programmatic and technical issues, is minimized. The Waste Certification Program (WCP) itself has been modified to allow the waste certification function to be performed by any of the personnel within the LWS Waste Acceptance/Certification functional area. However, a single individual may not perform both the technical waste acceptance review and the final certification review on the same 2109 data package. Those reviews must be performed by separate individuals in a peer review process. There will continue to be a designated WCO who will have lead programmatic responsibility for the WCP and will exercise overall program operational oversite as well as determine the overall requirements of the certification program. The quality assurance organization will perform independent, outside oversight to ensure that any organizational bias does not degrade the integrity of the waste certification process. The core elements of the previous WCP have been retained, however, the terms and process structure have been modified.. There are now two ''control points,'' (1) the data package enters the waste certification process with the signature of the Generator Interface/Generator Interface Equivalent (GI/GIE), (2) the package is ''certified'', thus exiting the process. The WCP contains three steps, (1) the technical review for waste acceptance, (2) a review of the

  10. Experimental program plan for the Waste Isolation Pilot Plant

    SciTech Connect

    Not Available

    1994-01-01

    The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included.

  11. Strategic plan for the geothermal energy program

    SciTech Connect

    1998-06-01

    Geothermal energy (natural heat in the Earth`s crust) represents a truly enormous amount of energy. The heat content of domestic geothermal resources is estimated to be 70,000,000 quads, equivalent to a 750,000-year supply of energy for the entire Nation at current rates of consumption. World geothermal resources (exclusive of resources under the oceans) may be as much as 20 times larger than those of the US. While industry has focused on hydrothermal resources (those containing hot water and/or steam), the long-term future of geothermal energy lies in developing technology to enable use of the full range of geothermal resources. In the foreseeable future, heat may be extracted directly from very hot rocks or from molten rocks, if suitable technology can be developed. The US Department of Energy`s Office of Geothermal Technologies (OGT) endorses a vision of the future in which geothermal energy will be the preferred alternative to polluting energy sources. The mission of the Program is to work in partnership with US industry to establish geothermal energy as a sustainable, environmentally sound, economically competitive contributor to the US and world energy supply. In executing its mission and achieving its long-term vision for geothermal energy, the Program has identified five strategic goals: electric power generation; direct use applications and geothermal heat pumps; international geothermal development; science and technology; and future geothermal resources. This report discusses the objectives of these five goals.

  12. Integrating human resources and program-planning strategies.

    PubMed

    Smith, J E

    1989-06-01

    The integration of human resources management (HRM) strategies with long-term program-planning strategies in hospital pharmacy departments is described. HRM is a behaviorally based, comprehensive strategy for the effective management and use of people that seeks to achieve coordination and integration with overall planning strategies and other managerial functions. It encompasses forecasting of staffing requirements; determining work-related factors that are strong "motivators" and thus contribute to employee productivity and job satisfaction; conducting a departmental personnel and skills inventory; employee career planning and development, including training and education programs; strategies for promotion and succession, including routes of advancement that provide alternatives to the managerial route; and recruitment and selection of new personnel to meet changing departmental needs. Increased competitiveness among hospitals and a shortage of pharmacists make it imperative that hospital pharmacy managers create strategies to attract, develop, and retain the right individuals to enable the department--and the hospital as a whole--to grow and change in response to the changing health-care environment in the United States. Pharmacy managers would be greatly aided in this mission by the establishment of a well-defined, national strategic plan for pharmacy programs and services that includes an analysis of what education and training are necessary for their successful accomplishment. Creation of links between overall program objectives and people-planning strategies will aid hospital pharmacy departments in maximizing the long-term effectiveness of their practice.

  13. Program Plan for 2005: NASA Scientific and Technical Information Program

    NASA Technical Reports Server (NTRS)

    2005-01-01

    Throughout 2005 and beyond, NASA will be faced with great challenges and even greater opportunities. Following a period of reevaluation, reinvention, and transformation, we will move rapidly forward to leverage new partnerships, approaches, and technologies that will enhance the way we do business. NASA's Scientific and Technical Information (STI) Program, which functions under the auspices of the Agency's Chief Information Officer (CIO), is an integral part of NASA's future. The program supports the Agency's missions to communicate scientific knowledge and understanding and to help transfer NASA's research and development (R&D) information to the aerospace and academic communities and to the public. The STI Program helps ensure that the Agency will remain at the leading edge of R&D by quickly and efficiently capturing and sharing NASA and worldwide STI to use for problem solving, awareness, and knowledge management and transfer.

  14. Nuclear Explosion Monitoring Research and Engineering Program - Strategic Plan

    SciTech Connect

    Casey, Leslie A.

    2004-09-01

    The Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Nuclear Explosion Monitoring Research and Engineering (NEM R&E) Program is dedicated to providing knowledge, technical expertise, and products to US agencies responsible for monitoring nuclear explosions in all environments and is successful in turning scientific breakthroughs into tools for use by operational monitoring agencies. To effectively address the rapidly evolving state of affairs, the NNSA NEM R&E program is structured around three program elements described within this strategic plan: Integration of New Monitoring Assets, Advanced Event Characterization, and Next-Generation Monitoring Systems. How the Program fits into the National effort and historical accomplishments are also addressed.

  15. Standard Review Plan Maintenance Program implementing procedures document

    SciTech Connect

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections.

  16. Career Development in Industry. A Study of Selected Programs and Recommendations for Program Planning.

    ERIC Educational Resources Information Center

    Cohen, Barbara S.

    A study was conducted to see what specific programs have been developed for employee career planning and development in order to help organizations interested in establishing career development programs learn what other organizations are doing, what types of programs are in effect and how they are managed. The study was based upon information…

  17. Human Research Program Integrated Research Plan. Revision A January 2009

    NASA Technical Reports Server (NTRS)

    2009-01-01

    The Integrated Research Plan (IRP) describes the portfolio of Human Research Program (HRP) research and technology tasks. The IRP is the HRP strategic and tactical plan for research necessary to meet HRP requirements. The need to produce an IRP is established in HRP-47052, Human Research Program - Program Plan, and is under configuration management control of the Human Research Program Control Board (HRPCB). Crew health and performance is critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological and behavioral effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes HRP s approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and how they are integrated to provide a risk mitigation tool. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.

  18. Strategic plan for the restructured US fusion energy sciences program

    SciTech Connect

    1996-08-01

    This plan reflects a transition to a restructured fusion program, with a change in focus from an energy technology development program to a fusion energy sciences program. Since the energy crisis of the early 1970`s, the U.S. fusion program has presented itself as a goal- oriented fusion energy development program, with milestones that required rapidly increasing budgets. The Energy Policy Act of 1992 also called for a goal-oriented development program consistent with the Department`s planning. Actual funding levels, however, have forced a premature narrowing of the program to the tokamak approach. By 1995, with no clear, immediate need driving the schedule for developing fusion energy and with enormous pressure to reduce discretionary spending, Congress cut fusion program funding for FY 1996 by one-third and called for a major restructuring of the program. Based on the recommendations of the Fusion Energy Advisory Committee (FEAC), the Department has decided to pursue a program that concentrates on world-class plasma, science, and on maintaining an involvement in fusion energy science through international collaboration. At the same time, the Japanese and Europeans, with energy situations different from ours, are continuing with their goal- oriented fusion programs. Collaboration with them provides a highly leveraged means of continued involvement in fusion energy science and technology, especially through participation in the engineering and design activities of the International Thermonuclear Experimental Reactor program, ITER. This restructured fusion energy sciences program, with its focus on fundamental fusion science and technology, may well provide insights that lead to more attractive fusion power plants, and will make use of the scientific infrastructure that will allow the United States to launch a fusion energy development program at some future date.

  19. Coal Power Systems strategic multi-year program plans

    SciTech Connect

    2001-02-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

  20. SDI (Strategic Defense Initiative) software technology program plan. Final report

    SciTech Connect

    Linn, C.J.; Redwine, S.T.; Bloom, M.I.; Brykczynski, B.; Chludzinski, J.

    1987-06-01

    This paper was prepared in response to a request from the Battle Management C3 office within the Strategic Defense Initiative Organization (SDIO) of the Department of Defense (DoD). The request was for a software-technology program plan to define software research and development (RandD) efforts required by the SDI, and to provide the basis for integrating the SDIO software technology program with ongoing non-SDIO programs. The paper emphasizes reviewing the ongoing software programs and plans within the DoD and academia. The reviews identify critical software technology areas required to meet the unique SDI requirements, and indicate priorities among the software technologies to meet attainability, productivity, and reliability goals, as well as functional performance objectives.

  1. MIP- MULTIMISSION INTERACTIVE PICTURE PLANNING PROGRAM

    NASA Technical Reports Server (NTRS)

    Callahan, J. D.

    1994-01-01

    The Multimission Interactive Picture Planner, MIP, is a scientifically accurate and fast, 3D animation program for deep space. MIP is also versatile, reasonably comprehensive, portable, and will run on microcomputers. New techniques were developed to rapidly perform the calculations and transformations necessary to animate scientifically accurate 3D space. At the same time, portability is maintained, as the transformations and clipping have been written in FORTRAN 77 code. MIP was primarily designed to handle Voyager, Galileo, and the Space Telescope. It can, however, be adapted to handle other missions. The space simulation consists of a rotating body (usually a planet), any natural satellites, a spacecraft, the sun, stars, descriptive labelling, and field of view boxes. The central body and natural satellites are tri-axial wireframe representations with terminators, limbs, and landmarks. Hidden lines are removed for the central body and natural satellites, but not for the scene as a whole so that bodies may be seen behind one another. The program has considerable flexibility in its step time, observer position, viewed object, field of view, etc. Most parameters may be changed from the keyboard while the simulation is running. When MIP is executed it will ask the user for a control file, which should be prepared before execution. The control file identifies which mission MIP should simulate, the star catalog files, the ephemerides files to be used, the central body, planets, asteroids, and comets, and solar system landmarks and constants such as planets, asteroids, and comets. The control file also describes the fields of view. Control files are included to simulate the Voyager 1 encounter at Jupiter and the Giotto spacecraft's flyby of Halley's comet. Data is included for Voyager 1 and 2 (all 6 planetary encounters) and Giotto. MIP was written for an IBM PC or compatibles. It requires 512K of RAM, a CGA or compatible graphics adapter, and DOS 2.0 or higher. Users

  2. MIP- MULTIMISSION INTERACTIVE PICTURE PLANNING PROGRAM

    NASA Technical Reports Server (NTRS)

    Callahan, J. D.

    1994-01-01

    The Multimission Interactive Picture Planner, MIP, is a scientifically accurate and fast, 3D animation program for deep space. MIP is also versatile, reasonably comprehensive, portable, and will run on microcomputers. New techniques were developed to rapidly perform the calculations and transformations necessary to animate scientifically accurate 3D space. At the same time, portability is maintained, as the transformations and clipping have been written in FORTRAN 77 code. MIP was primarily designed to handle Voyager, Galileo, and the Space Telescope. It can, however, be adapted to handle other missions. The space simulation consists of a rotating body (usually a planet), any natural satellites, a spacecraft, the sun, stars, descriptive labelling, and field of view boxes. The central body and natural satellites are tri-axial wireframe representations with terminators, limbs, and landmarks. Hidden lines are removed for the central body and natural satellites, but not for the scene as a whole so that bodies may be seen behind one another. The program has considerable flexibility in its step time, observer position, viewed object, field of view, etc. Most parameters may be changed from the keyboard while the simulation is running. When MIP is executed it will ask the user for a control file, which should be prepared before execution. The control file identifies which mission MIP should simulate, the star catalog files, the ephemerides files to be used, the central body, planets, asteroids, and comets, and solar system landmarks and constants such as planets, asteroids, and comets. The control file also describes the fields of view. Control files are included to simulate the Voyager 1 encounter at Jupiter and the Giotto spacecraft's flyby of Halley's comet. Data is included for Voyager 1 and 2 (all 6 planetary encounters) and Giotto. MIP was written for an IBM PC or compatibles. It requires 512K of RAM, a CGA or compatible graphics adapter, and DOS 2.0 or higher. Users

  3. General test plan redundant sensor strapdown IMU evaluation program

    NASA Technical Reports Server (NTRS)

    Hartwell, T.; Irwin, H. A.; Miyatake, Y.; Wedekind, D. E.

    1971-01-01

    The general test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The inertial unit contains six gyros and three orthogonal accelerometers. The software incorporates failure detection and correction logic and a land vehicle navigation program. The principal objective of the test is a demonstration of the practicability, reliability, and performance of the inertial measuring unit with failure detection and correction in operational environments.

  4. Configuration management program plan for Hanford site systems engineering

    SciTech Connect

    Hoffman, A.G.

    1994-11-14

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  5. The NASA Cryogenic Fluid Management Technology Program Plan

    NASA Technical Reports Server (NTRS)

    Faddoul, James R.; Mcintyre, Stanley D.

    1991-01-01

    The status of the NASA Cryogenic Fluid Management Technology Program Plan is discussed along with specific needs for near future missions. Using the Space Exploration Initiative mission set, cost/benefit projections are then made for development of advanced cryogenic fluid management techniques. Space based and earth based test programs are discussed relative to the technology requirements for liquid storage, supply and transfer and for fluid transfer and advanced instrumentation.

  6. Hydrologic data-verification management program plan

    USGS Publications Warehouse

    Alexander, C.W.

    1982-01-01

    Data verification refers to the performance of quality control on hydrologic data that have been retrieved from the field and are being prepared for dissemination to water-data users. Water-data users now have access to computerized data files containing unpublished, unverified hydrologic data. Therefore, it is necessary to develop techniques and systems whereby the computer can perform some data-verification functions before the data are stored in user-accessible files. Computerized data-verification routines can be developed for this purpose. A single, unified concept describing master data-verification program using multiple special-purpose subroutines, and a screen file containing verification criteria, can probably be adapted to any type and size of computer-processing system. Some traditional manual-verification procedures can be adapted for computerized verification, but new procedures can also be developed that would take advantage of the powerful statistical tools and data-handling procedures available to the computer. Prototype data-verification systems should be developed for all three data-processing environments as soon as possible. The WATSTORE system probably affords the greatest opportunity for long-range research and testing of new verification subroutines. (USGS)

  7. 25 CFR 170.700 - What is the IRR Program stewardship plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the IRR Program stewardship plan? 170.700 Section... ROADS PROGRAM Program Oversight and Accountability § 170.700 What is the IRR Program stewardship plan? The IRR Program stewardship plan delineates the respective roles and responsibilities of BIA and...

  8. 25 CFR 170.700 - What is the IRR Program stewardship plan?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false What is the IRR Program stewardship plan? 170.700 Section... ROADS PROGRAM Program Oversight and Accountability § 170.700 What is the IRR Program stewardship plan? The IRR Program stewardship plan delineates the respective roles and responsibilities of BIA and...

  9. Financial services FY 1996 site support program plan, WBS 6.10.4. Revision 1

    SciTech Connect

    Schafer, D.D.

    1995-09-01

    This program plan outlines the financial services to be provided to the Hanford reservation by the Westinghouse Hanford Company. The topics of the plan include the Hanford strategic plan, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance and program funding required.

  10. A Seven-Step Business Plan Methodology To Develop and Manage Certificate Programs.

    ERIC Educational Resources Information Center

    Cherif, Karim

    2000-01-01

    Outlines a process for writing a business plan for university certificate programs. The plan's sections include executive summary, rationale and objectives, prospective student profile, external involvement, program characteristics, marketing and promotion, and program administration. (SK)

  11. Sequential decision plans, benthic macroinvertebrates, and biological monitoring programs

    NASA Astrophysics Data System (ADS)

    Jackson, John K.; Resh, Vincent H.

    1989-07-01

    A common obstacle to the inclusion of benthic macroinvertebrates in water quality monitoring programs is that numerous sample units must be examined in order to distinguish between impacted and unimpacted conditions, which can add significantly to the total cost of a monitoring program. Sequential decision plans can be used to reduce this cost because the number of sample units needed to classify a site as impacted or unimpacted is reduced by an average of 50%. A plan is created using definitions of unimpacted and impacted conditions, a description of the mathematical distribution of the data, and definitions of acceptable risks of type I and II errors. The applicability of using sequential decision plans and benthic macroinvertebrates in water quality monitoring programs is illustrated with several examples (e.g., identifying moderate and extreme changes in species richness in response to acid mine drainage; assessing the impact of a crude oil contamination on the density of two benthic populations; monitoring the effect of geothermal effluents on species diversity). These examples use data conforming to the negative binomial, Poisson, and normal distributions and define impact as changes in population density, species richness, or species diversity based on empirical data or the economic feasibility of the sequential decision plan. All mathematical formulae and intermediate values are provided for the step-by-step calculation of each sequential decision plan.

  12. 1992 Resource Program, 10 Year Plan : Draft II.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  13. 1992 Resource Program, 10 Year Plan : Draft II.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  14. Measuring infrastructure: A key step in program evaluation and planning

    PubMed Central

    Schmitt, Carol L.; Glasgow, LaShawn; Lavinghouze, S. Rene; Rieker, Patricia P.; Fulmer, Erika; McAleer, Kelly; Rogers, Todd

    2016-01-01

    State tobacco prevention and control programs (TCPs) require a fully functioning infrastructure to respond effectively to the Surgeon General’s call for accelerating the national reduction in tobacco use. The literature describes common elements of infrastructure; however, a lack of valid and reliable measures has made it difficult for program planners to monitor relevant infrastructure indicators and address observed deficiencies, or for evaluators to determine the association among infrastructure, program efforts, and program outcomes. The Component Model of Infrastructure (CMI) is a comprehensive, evidence-based framework that facilitates TCP program planning efforts to develop and maintain their infrastructure. Measures of CMI components were needed to evaluate the model’s utility and predictive capability for assessing infrastructure. This paper describes the development of CMI measures and results of a pilot test with nine state TCP managers. Pilot test findings indicate that the tool has good face validity and is clear and easy to follow. The CMI tool yields data that can enhance public health efforts in a funding-constrained environment and provides insight into program sustainability. Ultimately, the CMI measurement tool could facilitate better evaluation and program planning across public health programs. PMID:27037655

  15. Measuring infrastructure: A key step in program evaluation and planning.

    PubMed

    Schmitt, Carol L; Glasgow, LaShawn; Lavinghouze, S Rene; Rieker, Patricia P; Fulmer, Erika; McAleer, Kelly; Rogers, Todd

    2016-06-01

    State tobacco prevention and control programs (TCPs) require a fully functioning infrastructure to respond effectively to the Surgeon General's call for accelerating the national reduction in tobacco use. The literature describes common elements of infrastructure; however, a lack of valid and reliable measures has made it difficult for program planners to monitor relevant infrastructure indicators and address observed deficiencies, or for evaluators to determine the association among infrastructure, program efforts, and program outcomes. The Component Model of Infrastructure (CMI) is a comprehensive, evidence-based framework that facilitates TCP program planning efforts to develop and maintain their infrastructure. Measures of CMI components were needed to evaluate the model's utility and predictive capability for assessing infrastructure. This paper describes the development of CMI measures and results of a pilot test with nine state TCP managers. Pilot test findings indicate that the tool has good face validity and is clear and easy to follow. The CMI tool yields data that can enhance public health efforts in a funding-constrained environment and provides insight into program sustainability. Ultimately, the CMI measurement tool could facilitate better evaluation and program planning across public health programs. Copyright © 2016 Elsevier Ltd. All rights reserved.

  16. 2010-2014 Pollution Prevention Program Strategic Plan

    EPA Pesticide Factsheets

    This Strategic Plan identifies a number of opportunities for EPA's Pollution Prevention (P2) Program to help reduce: the emission of greenhouse gasses; the use of hazardous materials; and the use of natural resources, while contributing to a greener and more sustainable economy.

  17. Multi-Year Program Plan 2011-2015

    SciTech Connect

    none,

    2010-12-01

    The Vehicle Technologies Multi-Year Program Plan, FY 2011 – 2015, outlines the scientific research and technologies developments for the five-year timeframe (beyond the FY 2010 base year) that need to be undertaken to help meet the Administration's goals for reductions in oil consumption and carbon emissions from the ground transport vehicle sector of the economy.

  18. Waste feed delivery program systems engineering implementation plan

    SciTech Connect

    O`Toole, S.M.

    1998-09-24

    This document defines the systems engineering processes and products planned by the Waste Feed Delivery Program to develop the necessary and sufficient systems to provide waste feed to the Privatization Contractor for Phase 1. It defines roles and responsibilities for the performance of the systems engineering processes and generation of products.

  19. 45 CFR 1355.35 - Program improvement plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON CHILDREN, YOUTH AND FAMILIES, FOSTER CARE MAINTENANCE PAYMENTS, ADOPTION ASSISTANCE, AND CHILD AND FAMILY SERVICES GENERAL § 1355.35 Program improvement... to assign the contents of the plan and/or the degree of improvement required for successful...

  20. MAP - a mapping and analysis program for harvest planning

    Treesearch

    Robert N. Eli; Chris B. LeDoux; Penn A. Peters

    1984-01-01

    The Northeastern Forest Experiment Station and the Department of Civil Engineering at West Virginia University are cooperating in the development of a Mapping and Analysis Program, to be named MAP. The goal of this computer software package is to significantly improve the planning and harvest efficiency of small to moderately sized harvest units located in mountainous...

  1. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Updated program plans and budgets. 603.885 Section 603.885 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Award Terms Related to Other Administrative Matters Financial and Programmatic Reporting § 603.885 Updated...

  2. The planning and control of NASA programs and resources

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The major management systems used to plan and control NASA programs and resources are described as well as their integration to form the agency's general management approach in carrying out its mission. Documents containing more detailed descriptions of the processes and techniques involved in the agency's major management systems are listed.

  3. Program Planning & Proposal Writing. Expanded Version. Grantsmanship Center Reprint Series.

    ERIC Educational Resources Information Center

    Kiritz, Norton J.

    Designed to assist both grantmaking agencies and applicants for funding, this proposal format describes and provides examples of the components of program planning and proposal writing. Each of the components is followed by a checklist. The first component clearly and concisely summarizes the request. The proposal introduction describes the…

  4. Planning and Costing Implications in American Teacher Education Programs.

    ERIC Educational Resources Information Center

    Goddu, Roland

    This report presents a costing model for teacher education programs. It explains that this is necessary since most teacher education innovations in the United States extensively use technological support, and involve high cost personnel, materials, and systems. The report also notes that the present state in planning and cost projections requires…

  5. Orbit attitude processor. STS-1 bench program verification test plan

    NASA Technical Reports Server (NTRS)

    Mcclain, C. R.

    1980-01-01

    A plan for the static verification of the STS-1 ATT PROC ORBIT software requirements is presented. The orbit version of the SAPIENS bench program is used to generate the verification data. A brief discussion of the simulation software and flight software modules is presented along with a description of the test cases.

  6. THE RICHMOND PLAN--THE PRE-TECHNICIAN PREPARATORY PROGRAM.

    ERIC Educational Resources Information Center

    FELDMAN, M.; AND OTHERS

    THE PURPOSE OF AN EXPERIMENTAL PLAN FOR TRAINING TECHNICALLY ORIENTED STUDENTS IN THE LAST 2 YEARS OF HIGH SCHOOL IS TO MOTIVATE UNDERACHIEVERS, POTENTIAL DROPOUTS, AND PROBLEM STUDENTS WITH MECHANICAL APTITUDES SO THAT THEY CAN REALIZE CONCRETE GOALS LEADING EITHER TO EMPLOYMENT OR TO CONTINUED EDUCATION. THE PROGRAM IS COMPOSED OF A 2-YEAR…

  7. Have a Bearable Summer: '86 Summer Reading Program Planning Manual.

    ERIC Educational Resources Information Center

    Jackson, Mary

    Because studies have found that children can lose a year in their reading skills and motivation during summers, this planning guide suggests ways for librarians to interest children in a summer reading program by appealing to their fascination with bears and teddy bears. The guide is organized chronologically, beginning with a timetable, followed…

  8. Academic Planning through Program Review: Can It Work?

    ERIC Educational Resources Information Center

    Fernandez, Thomas V.; Raab, Marjorie K.

    Nassau Community College (NCC) is currently working with a program evaluation model in which faculty from one department serve as peer evaluation consultants to direct the self-evaluations of other departments. The four functional objectives initially motivating the development of NCC's plan directed that: real decisions about academic programs…

  9. TTIP: Texas Teacher Internship Program: 1995 Curriculum Implementation Plans.

    ERIC Educational Resources Information Center

    Walenta, Brian T., Ed.

    In 1989 the Texas Alliance for Science, Technology and Mathematics Education began placing teachers of all levels at industry sites as part of its Texas Teacher Internship Program. In 1995, 15 teachers interned at 11 sites. Each teacher was required to develop a curriculum implementation plan which was to illustrate how they would translate the…

  10. Planning Strategic Communications and Outreach for the Solar Program

    SciTech Connect

    Pedigo, S.; Nahan, R.; Moon, S.; Gwinner, D.; Brooks, C.; Butler Burt, W.

    2005-01-01

    Advances made through the Solar Program in photovoltaic and solar thermal technologies must be well communicated to appropriate audiences if further technical and market growth will occur. As the Program's communications team, we developed a plan to: (1) integrate communications across the various solar technologies and reduce redundancy; (2) target audiences and messages strategically; (3) respond better to changes in markets, technology perceptions, audiences, and funding; (4) develop communication projects within the context of other relevant plans (e.g., Solar Program Multi-Year Technical Plan); (5) leverage limited resources; and (6) cultivate a multiyear mentality. Our approach included profiling eight key audiences, including their perceptions of solar technologies; formulating audience-specific messages and communication objectives and strategies; and proposing communications tactics to reinforce the objectives. Presently, we are conducting a needs assessment of print products, as well as a gap analysis. We will then prioritize projects, complete high-priority projects, measure effectiveness of selected projects and the plan, and seek strategic connections with other activities and programs.

  11. Preservation at Stony Brook. Preservation Planning Program. Study Report.

    ERIC Educational Resources Information Center

    Cook, Donald C.; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the State University of New York (SUNY), Stony Brook, working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  12. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Updated program plans and budgets. 603.885 Section 603.885 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Award Terms Related to Other Administrative Matters Financial and Programmatic Reporting § 603.885 Updated...

  13. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Updated program plans and budgets. 603.885 Section 603.885 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Award Terms Related to Other Administrative Matters Financial and Programmatic Reporting § 603.885 Updated...

  14. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Updated program plans and budgets. 603.885 Section 603.885 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Award Terms Related to Other Administrative Matters Financial and Programmatic Reporting § 603.885 Updated...

  15. World Weather Program: Plan for Fiscal Year 1978.

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC.

    This plan for 1978 describes the initiatives carried out by federal agencies of the United States which support or contribute to the goals of the World Weather Program (WWP). This document has four sections and a list of acronyms. Section one contains a summary of a recently concluded Data Systems Test. The results and lessons learned from this…

  16. Planning Learning Environments for Library Media Programs: An Introduction.

    ERIC Educational Resources Information Center

    Klasing, Jane P.; Callison, Daniel

    1992-01-01

    Klasing discusses the inability of school library facilities to meet current challenges for the delivery of programs and information. Callison then provides an overview of this issue on planning learning environments for school media centers, which contains four articles covering space requirements, ergonomic design, legislation on equal access,…

  17. From Strategic Plan to Sustainable Program: One College's Journey

    ERIC Educational Resources Information Center

    Rush, Carol A.

    2010-01-01

    Westmoreland County Community College focused on enhancing success for first-time, full-time, degree-seeking students testing into two or more developmental courses. The project progressed from a planning objective, to a program on a sliding-scale budget, to becoming sustainable in five years. Results include improved retention and enhanced data…

  18. Phased project planning and development in anticipation of operational programs

    NASA Technical Reports Server (NTRS)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  19. Detailed Test Plan Redundant Sensor Strapdown IMU Evaluation Program

    NASA Technical Reports Server (NTRS)

    Hartwell, T.; Miyatake, Y.; Wedekind, D. E.

    1971-01-01

    The test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The subjects discussed are: (1) test philosophy and limitations, (2) test sequence, (3) equipment specifications, (4) general operating procedures, (5) calibration procedures, (6) alignment test phase, and (7) navigation test phase. The data and analysis requirements are analyzed.

  20. A Role of Evaluation in Planning Educational Programs.

    ERIC Educational Resources Information Center

    Grotelueschen, Arden D.; Gooler, Dennis D.

    This paper suggests that while evaluation means different things to different people, the focus is characteristically on what has been, or is being done. It is proposed that evaluation also be applied to things not yet done; that evaluation has a significant and continuous role in planning any educational program. Evaluation is seen as…

  1. Planning Adolescent Mental Health Promotion Programming in Saskatoon

    ERIC Educational Resources Information Center

    Cushon, Jennifer; Waldner, Cheryl; Scott, Christina; Neudorf, Cordell

    2016-01-01

    Background: We assessed associations between key demographic risk factors and the outcome of depressed mood in Saskatoon, Saskatchewan, to inform the planning and implementation of mental health promotion programming in schools. Methods: In the 2008/2009 school year, 3,958 students from grades 5 through 8 from 76 elementary schools completed…

  2. University of Georgia: System of Program Planning and Budgeting.

    ERIC Educational Resources Information Center

    Sterns, A. A.

    This report reflects the status of conceptualization, progress, and partial implementation of a system of program planning and budgeting (PPB) at the University of Georgia (UGA). Emphasis is placed on detailed information flow necessary for implementation of a PPB system, how the data files existing at UGA will support further development and…

  3. 45 CFR 1355.35 - Program improvement plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Program improvement plans. 1355.35 Section 1355.35 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON CHILDREN, YOUTH AND FAMILIES, FOSTER...

  4. Developing & Innovating Education in Egypt: Policy & Plans. Implementation Programs.

    ERIC Educational Resources Information Center

    National Centre for Educational Research, Cairo (Egypt).

    Policies, plans, and programs for development and innovation in Egyptian education are discussed. Chapter 1 focuses on the fundamentals of general education in Egypt, examining fundamental traits of Egyptian society, local and international variables, general trends of educational development and innovation, traits and goals of future education,…

  5. Planning Adolescent Mental Health Promotion Programming in Saskatoon

    ERIC Educational Resources Information Center

    Cushon, Jennifer; Waldner, Cheryl; Scott, Christina; Neudorf, Cordell

    2016-01-01

    Background: We assessed associations between key demographic risk factors and the outcome of depressed mood in Saskatoon, Saskatchewan, to inform the planning and implementation of mental health promotion programming in schools. Methods: In the 2008/2009 school year, 3,958 students from grades 5 through 8 from 76 elementary schools completed…

  6. Bioenergy Technologies Office Multi-Year Program Plan: July 2014

    SciTech Connect

    none,

    2014-07-09

    This is the May 2014 Update to the Bioenergy Technologies Office Multi-Year Program Plan, which sets forth the goals and structure of the Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation.

  7. Training Program for Operation of Emergency Vehicles. Instructor Lesson Plans.

    ERIC Educational Resources Information Center

    INNOVATRIX, Inc., Ingomar, PA.

    Unit lesson plans for the three parts of the Emergency Vehicle (EV) Operator training program are provided. The units in parts 1 and 2 are designed for use in a classroom setting and contain the following components: description of the unit; trainees' knowledge objectives; instructor preparation activities; instructional content/presentation…

  8. Quality Assurance Program Plan for radionuclide airborne emissions monitoring

    SciTech Connect

    Vance, L.M.

    1993-07-01

    This Quality Assurance Program Plan (QAPP) describes the quality assurance requirements and responsibilities for radioactive airborne emissions measurements activities from regulated stacks are controlled at the Hanford Site. Detailed monitoring requirements apply to stacks exceeding 1% of the standard of 10 mrem annual effective dose equivalent to the maximally exposed individual from operations of the Hanford Site.

  9. A Guide for Planning Programs in Agricultural Education.

    ERIC Educational Resources Information Center

    Eichelberger, A. E.; And Others

    The general information necessary for planning a high school program in agricultural educated is provided, based on the following briefly described occupational areas: agricultural production, agricultural supplied/services, agricultural mechanics, agricultural products (processing, inspection, and marketing), agricultural resources (conversation,…

  10. Institute for Superintendents, Planning and Implementing Programs in Vocational Education.

    ERIC Educational Resources Information Center

    Georgia Univ., Athens. Coll. of Education.

    A 3-day institute was held to assist 30 school superintendents in acquiring information and an understanding essential for planning, implementing, and administering more adequate vocational education programs in their schools. Major presentations were: (1) "The Role and Responsibility of the Superintendent for Vocational Education" by J.W. Letson,…

  11. 78 FR 30218 - Pre-Existing Condition Insurance Plan Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... HUMAN SERVICES 45 CFR Part 152 RIN 0938-AQ70 Pre-Existing Condition Insurance Plan Program AGENCY... payment rates for covered services furnished to individuals enrolled in the Pre-Existing Condition... to eligible uninsured individuals with pre- existing conditions. A number of states elected...

  12. Performance assessment implementation plan for the geologic repository program

    SciTech Connect

    1990-01-01

    Performance assessment is a major constituent of the program being conducted in the Civilian Radioactive Waste Management (CRWM) Program of the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations of repository-system performance to access compliance with regulations and to support the development of the geologic repository. To define the strategy for these evaluations, the DOE has developed this performance assessment strategy plan. This document discusses the need for such a strategy, the objectives and scope of the strategy plan, the relationship of the plan to other program plans. Additionally, it defines performance assessment and describes the roles of performance assessment in this program, discusses concepts and general strategies needed for performance assessment, outlines the content of the Safety Analysis Report, summarizes the requirements for the repository Environmental Impact Statement, discusses the requirements that apply to the site-suitability analyses and describes the site characterization. 10 figs., 7 tabs.

  13. Quality Assurance Plans under the Renewable Fuel Standard Program

    EPA Pesticide Factsheets

    Quality Assurance Plan or (QAP) is a voluntary program where independent third-parties may audit and verify that RINs have been properly generated and are valid for compliance purposes. RINs verified under a QAP may be purchased by regulated parties.

  14. A family planning program that pays for itself.

    PubMed

    1987-07-01

    In Japan, the condom is the method of choice of 82% of all contraceptive users. The Japan Family Planning Association covers about 3% of the total condom market through a well-organized social marketing scheme. Mobile guidance teams, equipped with a vehicle, supply contraceptives to health centers, independent midwives, and maternity hospitals in 17 prefectures and collect payment for condoms distributed after their previous visit. As an incentive, organizations and health institutions receive a commission for the condoms they supply. Japan's largest condom manufacturer provides supplies to the Family Planning Association at a very low price. The contraceptive social marketing program pays for its own promotion, and the Family Planning Association is able to support its other activities from the income it earns. The program was designed to complement rather than compete with commercial marketing channels such as pharmacies, which supply 60% of the 660 million condoms purchased in Japan each year.

  15. Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

    SciTech Connect

    Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad

    2011-10-01

    The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.

  16. Operating plan for the Office of International Health Programs

    SciTech Connect

    1996-01-01

    In this report unified ideas are presented about what the Office of International Health Programs does, what the individual contributions are, and how the organization connects to the Department of Energy. The planning efforts have focused on the office`s three areas of responsibility: Europe, Japan, and the Marshall Islands. Common to each technical program area are issues related to the following: health of populations exposed to radiation incidents and the associated medical aspects of exposure; dose reconstruction; training; and public involvement. Each of the program areas, its customers, and primary customer interests are described.

  17. Integrating expert systems with dynamic programming in generation expansion planning

    SciTech Connect

    David, A.K.; Rong-da, Z.

    1989-08-01

    Interactive software developed for integrating engineering experience and judgement from the planning dept. with a powerful mathematic optimisation method is described. The excessive size of the state space generated by conventional multidimensional dynamic programming is reduced to real world engineering proportions by rule based procedures for implementing Windows in state space and Controls in policy space. Project Frames describing generation options and State Frames describing future conditions of the system are established and manipulated by rules. Dynamic programming simultaneously tracks a feasible set of sub-optimal scenarios. The program is interactive and is written in PROLOG with numerically intensive portions in C.

  18. Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan

    SciTech Connect

    Early, T.O.

    1994-05-01

    The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.

  19. UMTRA technical assistance contractor quality assurance program plan

    SciTech Connect

    Not Available

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements.

  20. Report to Congress: Comprehensive Program Plan for Advanced Turbine Systems

    NASA Astrophysics Data System (ADS)

    1993-07-01

    Consistent with the Department of Energy (DOE) mission, the Advanced Turbine Systems (ATS) Program will develop more efficient gas turbine systems for both utility and industrial electric power generation (including cogeneration). The program will develop base-load power systems for commercial offering in the year 2000. Although the target fuel is natural gas, the ATS will be adaptable to coal and biomass firing. All ATS will exhibit these characteristics: Ultra-high efficiency utility systems: 60 percent (lower heating value basis); industrial systems--15 percent improvement over today's best gas turbine systems; Environmental superiority (reduced nitrogen oxides (NO(x)), carbon dioxide (CO2), carbon monoxide (CO), and unburned hydrocarbons (UHC)); and cost competitiveness (10 percent lower cost of electricity). This Program Plan was requested in the House, Senate, and Conference Reports on the FY 1993 Interior and Related Agencies Appropriations Act, Public Law 102--381, and is consistent with the Energy Policy Act of 1992, which (in Section 2112) identifies work for improving gas turbines. This plan outlines the 8-year ATS Program and discusses rationale and planning. Total Program costs are estimated to be $700 million, consisting of an approximate $450 million government share, and an approximate $250 million cost-share by industrial participants.

  1. On financial management of population and family planning programs.

    PubMed

    1976-03-01

    In the 3 day workshop of the Southeast Asian Region on the Financial Management of Population/Family Planning Programs held from March 15 to 17 it was recommended that there by standardization of financial reporting procedures by country programs for population planning. Related to this recommendation was the proposal that measurement of cost benefit and cost effective analysis of country programs be undertaken by the Research and Evaluation Units of the respective population organizations in close coordination with the financial managers. Other major recommendations included: 1) closer coordination between donor agencies and policy making bodies of country programs in the disbursement of funds; 2) more exchange of experiences, ideas, technical knowledge on the financial management of country programs in the Inter G overnmental Coordinating Committee for Southeast Asian countries; and 3) inclusion of applicable financial management topics in the training of clinical staff and followup in actual operation. The priority areas identified for the Inter Governmental Coordinating Committee countries (Nepal, Malaysia, Thailand, Singapore, and the Philippines) are financial planning; generation of resources and budgeting and allocation of funds; accounting and disbursement of funds; financial management at the clinic level; use of and control of foreign aid; and cost effectiveness, benefit analysis and financial reporting.

  2. Report to Congress: Comprehensive Program Plan for Advanced Turbine Systems

    SciTech Connect

    Not Available

    1993-07-01

    Consistent with the Department of Energy (DOE) mission, the Advanced Turbine Systems (ATS) Program will develop more efficient gas turbine systems for both utility and industrial electric power generation (including cogeneration). The Program will develop base-load power systems for commercial offering in the year 2000. Although the target fuel is natural gas, the ATS will be adaptable to coal and biomass firing. All ATS will exhibit these characteristics: Ultra-high efficiency [utility systems: 60 percent (lower heating value basis); industrial systems: 15 percent improvement over today`s best gas turbine systems]; Environmental superiority [reduced nitrogen oxides (NO{sub x}), carbon dioxide (CO{sub 2}), carbon monoxide (CO), and unburned hydrocarbons (UHC)]; and Cost competitiveness [10 percent lower cost of electricity]. This Program Plan was requested in the House, Senate, and Conference Reports on the FY 1993 Interior and Related Agencies Appropriations Act, Public Law 102--381, and is consistent with the Energy Policy Act of 1992, which (in Section 2112) identifies work for improving gas turbines. This plan outlines the 8-year ATS Program and discusses rationale and planning. Total Program costs are estimated to be $700 million, consisting of an approximate $450 million government share and an approximate $250 million cost-share by industrial participants.

  3. The ORNL Surplus Facilities Management Program Long Range Plan

    SciTech Connect

    Myrick, T.E.

    1984-09-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy`s (DOE) National SFMP, administered by the Richland Operations Office. This program was established to provide for the management of DOE surplus radioactively contaminated facilities from the end of their operating life until final facility disposition is completed. As part of this program, the ORNL SFMP oversees some 76 individual surplus facilities, ranging in complexity from abandoned waste storage tanks to large experimental reactors. The ORNL SFMP has prepared this Long Range Plan to outline the long-term management strategy for those facilities included in the program. The primary objective of this plan are to: (1) develop a base of information for each ORNL SFMP facility, (2) conduct preliminary decommissioning analyses to identify feasible alternatives, (3) assess the current and future risk of each facility, (4) establish a priority list for the decommissioning projects, and (5) integrate the individual project costs and schedules into an overall program schedule and cost estimate for the ORNL site. The Long Range Plan also provides an overview of the ORNL SFMP management structure, specifies the decommissioning criteria to be employed, and identifies special technical problems, research and development needs, and special facilities and equipment that may be required for decommissioning operations.

  4. [Improved program maintenance of the CIRCIS dosimetric planning system].

    PubMed

    Sevast'ianov, A I; Liutova, N A; Ratner, T G

    1983-03-01

    A special computer complex CIRCIS (Informatique, France) is used in the All-Union Cancer Research Center, USSR AMS, for the dosimetric planning of radiotherapy on 5 gamma-beam units and electron accelerator. Mathematical maintenance of the complex includes programs of the calculation of dose distribution for gamma-, inhibition and electron radiation but has no program of the calculation of the time of irradiation. The authors have devised and introduced into the complex such a program in the Fortran language that makes it possible to calculate within 2-3 min the time of irradiation for multifield rotation therapy using several units as a time, thus expediting the dosimetric planning for patients' irradiation.

  5. Program Risk Planning with Risk as a Resource

    NASA Technical Reports Server (NTRS)

    Ray, Paul S.

    1998-01-01

    The current focus of NASA on cost effective ways of achieving mission objectives has created a demand for a change in the risk management process of a program. At present, there is no guidelines as to when risk taking is justified due to high cost for a marginal improvement in risk. As a remedial step, Dr. Greenfield of NASA, developed a concept of risk management with risk as a resource. In the report, the following topics are addressed: (1) the risk management approach; (2) planning risk and program life cycle; (3) key components of a typical program; (4) the risk trading methodology; (5) review and decision process; (6) merits of the proposed risk planning approach; and (7) recommendations.

  6. Women's experiences after Planned Parenthood's exclusion from a family planning program in Texas.

    PubMed

    Woo, C Junda; Alamgir, Hasanat; Potter, Joseph E

    2016-04-01

    We assessed the impact on depot medroxyprogesterone continuation when a large care provider was banned from a state-funded family planning program. We used three methods to assess the effect of the ban: (a) In a records review, we compared how many state program participants returned to two Planned Parenthood affiliates for a scheduled dose of depot medroxyprogesterone acetate (DMPA) immediately after the ban; (b) We conducted phone interviews with 224 former Planned Parenthood patients about DMPA use and access to contraception immediately after the ban; (c) We compared current contraceptive method of our interviewees to that of comparable DMPA users in the National Survey of Family Growth 2006-2010 (NSFG). (a) Fewer program clients returned for DMPA at a large urban Planned Parenthood, compared to a remotely located affiliate (14.4%, vs. 64.8%), reflecting different levels of access to alternative providers in the two cities. (b) Among program participants who went elsewhere for the injection, only 56.8% obtained it at no cost and on time. More than one in five women missed a dose because of barriers, most commonly due to difficulty finding a provider. (c) Compared to NSFG participants, our interviewees used less effective methods of contraception, even more than a year after the ban went into effect. Injectable contraception use was disrupted during the rollout of the state-funded family planning program. Women living in a remote area of Texas encountered more barriers. Requiring low-income family planning patients to switch healthcare providers has adverse consequences. Copyright © 2016 Elsevier Inc. All rights reserved.

  7. 32 CFR 32.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false Revision of budget and program plans. 32.25... Management § 32.25 Revision of budget and program plans. (a) The budget plan is the financial expression of... required to report deviations from budget and program plans, and request prior approvals for budget and...

  8. Statewide Strategic Forest Resource Planning Programs: Evaluation Based on Context, Process, Outputs, and Performance.

    ERIC Educational Resources Information Center

    Gray, Gerald J.; Ellefson, Paul V.

    1991-01-01

    Evaluation of strategic planning programs is illustrated using the examples of statewide forest resource planning programs implemented by state governments in 1986. Client-based perspectives were studied via a survey of 216 officials affected by the forestry planning program. Considering planning's context, process, outputs, and performance helped…

  9. 77 FR 55430 - Arkansas Regulatory Program and Abandoned Mine Land Reclamation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-10

    ... Abandoned Mine Land Reclamation Plan AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior... regulatory program (Arkansas program) and the Arkansas abandoned mine land reclamation plan (Arkansas plan... revise substantial portions of its regulatory program and abandoned mine land reclamation plan, make...

  10. Puerto Rico water resources planning model program description

    USGS Publications Warehouse

    Moody, D.W.; Maddock, Thomas; Karlinger, M.R.; Lloyd, J.J.

    1973-01-01

    Because the use of the Mathematical Programming System -Extended (MPSX) to solve large linear and mixed integer programs requires the preparation of many input data cards, a matrix generator program to produce the MPSX input data from a much more limited set of data may expedite the use of the mixed integer programming optimization technique. The Model Definition and Control Program (MODCQP) is intended to assist a planner in preparing MPSX input data for the Puerto Rico Water Resources Planning Model. The model utilizes a mixed-integer mathematical program to identify a minimum present cost set of water resources projects (diversions, reservoirs, ground-water fields, desalinization plants, water treatment plants, and inter-basin transfers of water) which will meet a set of future water demands and to determine their sequence of construction. While MODCOP was specifically written to generate MPSX input data for the planning model described in this report, the program can be easily modified to reflect changes in the model's mathematical structure.

  11. Utility Battery Storage Systems Program plan: FY 1994--FY 1998

    SciTech Connect

    Not Available

    1994-02-01

    The Utility Battery Storage Systems Program, sponsored by the US Department of Energy (DOE), is addressing needed improvements so that the full benefits of these systems can be realized. A key element of the Program is the quantification of the benefits of batteries used in utility applications. The analyses of the applications and benefits are ongoing, but preliminary results indicate that the widespread introduction of battery storage by utilities could benefit the US economy by more than $26 billion by 2010 and create thousands of new jobs. Other critical elements of the DOE Program focus on improving the batteries, power electronics, and control subsystems and reducing their costs. These subsystems are then integrated and the systems undergo field evaluation. Finally, the most important element of the Program is the communication of the capabilities and benefits of battery systems to utility companies. Justifiably conservative, utilities must have proven, reliable equipment that is economical before they can adopt new technologies. While several utilities are leading the industry by demonstrating battery systems, a key task of the DOE program is to inform the entire industry of the value, characteristics, and availability of utility battery systems so that knowledgeable decisions can be made regarding future investments. This program plan for the DOE Utility Battery Storage Systems Program describes the technical and programmatic activities needed to bring about the widespread use of batteries by utilities. By following this plan, the DOE anticipates that many of the significant national benefits from battery storage will be achieved in the near future.

  12. Environmental development plan for transportation programs: FY80 update

    SciTech Connect

    Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

    1980-09-01

    This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

  13. Lawrence Berkeley Laboratory Self-Assessment Program: Implementation Plan

    SciTech Connect

    Not Available

    1992-06-01

    The Lawrence Berkeley Laboratory (LBL) Self-Assessment Program provides a formal process for assuring quality and regulatory compliance in all facets of Laboratory operations. The program, which integrates the ongoing self-assessment activities of the individual Divisions and Offices in a comprehensive, top-to-bottom process, provides assistance to the US Department of Energy (DOE), the University of California, and Laboratory management in their appraisals of Laboratory performance. This document describes the program goals, scope, responsibilities, elements, and implementation schedule. This document is also the implementation plan for the institutional level self-assessment program. Each Division is also required to develop a self-assessment program that contains the elements described in this document.

  14. Business planning for university health science programs: a case study.

    PubMed

    Austin, Michael; Milos, Nadine; Raborn, G Wayne

    2002-02-01

    Many publicly funded education programs and organizations have developed business plans to enhance accountability. In the case of the Department of Dentistry at the University of Alberta, the main impetus for business planning was a persistent deficit in the annual operating fund since a merger of a stand-alone dental faculty with the Faculty of Medicine. The main challenges were to balance revenues with expenditures, to reduce expenditures without compromising quality of teaching, service delivery and research, to maintain adequate funding to ensure future competitiveness, and to repay the accumulated debt owed to the university. The business plan comprises key strategies in the areas of education, clinical practice and service, and research. One of the strategies for education was to start a BSc program in dental hygiene, which was accomplished in September 2000. In clinical practice, a key strategy was implementation of a clinic operations fee, which also occurred in September 2000. This student fee helps to offset the cost of clinical practice. In research, a key strategy has been to strengthen our emphasis on prevention technologies. In completing the business plan, we learned the importance of identifying clear goals and ensuring that the goals are reasonable and achievable; gaining access to high-quality data to support planning; and nurturing existing positive relationships with external stakeholders such as the provincial government and professional associations.

  15. Multiyear Program Plan for the High Temperature Materials Laboratory

    SciTech Connect

    Arvid E. Pasto

    2000-03-17

    Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly, the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO{sub x} and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required.

  16. The Elmira Plan. Planning, Implementing and Sustaining a Comprehensive Professional Staff Development Program.

    ERIC Educational Resources Information Center

    Arikian, John A.

    The staff development program of the Elmira City School District, New York, is designed to assist teachers in teaching to the specific objectives of the curriculum, and to ensure that teachers have the requisite knowledge and skills to accomplish this. The plan provides an opportunity for every teacher, building administrator, and the…

  17. Planning-Programming-Budgeting System. Intermediate Unit Planning Study. Final Report.

    ERIC Educational Resources Information Center

    Montgomery County School Board, Norristown, PA.

    In 1965-66 most local school districts in Pennsylvania completed reorganization by consolidating 67 county school offices into 25 or 30 intermediate administrative units. This document presents the results of various task group activities and projected activities to develop a "generalized" educational planning, programing, budgeting…

  18. Facilities Planning Guide for Special Education Programs: Planning Accessibility for the Handicapped in Public Schools.

    ERIC Educational Resources Information Center

    Brooks, Kenneth W.

    The guide details characteristics to provide architecturally accessible special education programs for handicapped students. Impetus for the accessibility movement is traced to legislation, including the Architectural Barriers Act and Sections 503 and 504 of the Rehabilitation Act of 1973. Planning features considered are the development of a…

  19. Facilities Planning Guide for Special Education Programs: Planning Accessibility for the Handicapped in Public Schools.

    ERIC Educational Resources Information Center

    Brooks, Kenneth W.

    The guide details characteristics to provide architecturally accessible special education programs for handicapped students. Impetus for the accessibility movement is traced to legislation, including the Architectural Barriers Act and Sections 503 and 504 of the Rehabilitation Act of 1973. Planning features considered are the development of a…

  20. The international postpartum family planning program: eight years of experience.

    PubMed

    Castadot, R G; Sivin, I; Reyes, P; Alers, J O; Chapple, M; Russel, J

    1975-11-01

    The International Postpartum Program was begun in 1966 in order to demonstrate the feasibility of providing efficient and effective family planning services in the context of the obstetrical care provided by hospitals. The project included 138 institutions in 21 countries. Over an eight-year period, 1.14 million women were recruited, representing 33 acceptors per 100 obstetrical/abortion patients in these hospitals. Relying primarily on modern methods of contraception, the pill, the IUD, and sterilization, the program provided about 124 years of contraceptive protection for each 100 obstetrical/abortion patients, or somewhat more than four years' protection per acceptor. Predischarge insertion of IUDs was found to be safe and effective. In all countries, the program acceptors experienced important changes in fertility over and above the effects of aging. The demonstration showed that basing a program on activities in the obstetrical wards permits a rapid buildup of services, without great cost for construction. Whether using specially trained additional staff to provide family planning education and information or relying on the existing staff, hospitals were able to recruit a substantial proportion of women on the maternity wards as acceptors. Cost per acceptor averaged about US$5.00 during the eight-year period--considerably below the cost per acceptor in the majority of national programs. Such economy arose because acceptance ratios for the International Postpartum Program were higher than ratios for national programs where the target population is more dispersed, and because only direct costs for the services needed to be considered. The idea of uniting family planning information and services with the maternity services of hospitals has been seized upon and replicated outside the International Postpartum Program. The governments of India, Pakistan, Indonesia, Colombia, Thailand, and the Philippines, among others, now operate such systems. Postpartum programs

  1. Plutonium stabilization and handling quality assurance program plan

    SciTech Connect

    Weiss, E.V.

    1998-04-22

    This Quality Assurance Program Plan (QAPP) identifies project quality assurance requirements for all contractors involved in the planning and execution of Hanford Site activities for design, procurement, construction, testing and inspection for Project W-460, Plutonium Stabilization and Handling. The project encompasses procurement and installation of a Stabilization and Packaging System (SPS) to oxidize and package for long term storage remaining plutonium-bearing special nuclear materials currently in inventory at the Plutonium Finishing Plant (PFP), and modification of vault equipment to allow storage of resulting packages of stabilized SNM.

  2. International Population Assistance and Family Planning Programs: Issues for Congress

    DTIC Science & Technology

    2008-07-24

    birth control . This policy, however, has generated contentious debate for over two decades, resulting in frequent clarification and modification of U.S. international family planning programs. In 1984, controversy arose over U.S. population aid policy when the Reagan Administration introduced restrictions, which became known as the "Mexico City policy." The Mexico City policy denies U.S. funds to foreign nongovernmental organizations (NGOs) that perform or promote abortion as a method of family planning -- even if the activities are undertaken with non-U.S. funds.

  3. Planned Closeout of the Cf-252 Loan/Lease Program

    SciTech Connect

    Sherman, Steven R; Patton, Bradley D

    2012-09-01

    New funding is sought to pursue planned closeout of the Cf-252 Loan Program. The work will be performed in phases. In the initial phase, users will be surveyed to determine whether they wish to take ownership of sources in their possession, or return them. In the second phase, sources will be recalled from non-DOE entities, and source ownership transfers will be performed. In the third phase, the remaining sources from DOE entities will be recalled. Initial funding of $350K is sought to fund the first phase, and to plan execution of the remaining phases given information collected from user surveys.

  4. ERD UMTRA Project quality assurance program plan, Revision 7

    SciTech Connect

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors.

  5. Geothermal-subsidence research program plan and review

    SciTech Connect

    Goldstein, N.E.; Noble, J.E.; Simkin, T.L.

    1980-09-01

    The revised Geothermal Subsidence Research Plan (GSRP) presented here is the result of two years of research based on the recommendations of a technical advisory committee and on the DOE/DGE's wish to include specific components applicable to the geopressure resources on the Gulf Coast. This revised plan describes events leading up to FY 1979 and 1980 and the resulting research activities completed for that period. At the time of this writing most of the projects are completed; this document summarizes the accomplishments of the GSRP during FY 1979 and 1980 and includes recommendations for the FY 1981 and 1982 programs.

  6. Budget FY 1996 Site Support Program Plan: WBS 6.10.1. Revision 1

    SciTech Connect

    Wemhoff, G.M.

    1995-09-01

    This is the budget site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance baseline schedule, cost baseline by month, and the program funding required.

  7. Developments in immunization planning in Cambodia--rethinking the culture and organization of national program planning.

    PubMed

    Soeung, S; Grundy, J; Kamara, L; McArthur, A; Samnang, C

    2007-01-01

    As part of its health system reconstruction following decades of civil war, Cambodia undertook a program of health sector reform in 1996 to expand coverage of essential health services to the population of 14 million, 80% of whom are resident in over 13 000 rural villages. During this reform period, one of the major national health programs, the National Immunization Program (NIP), adapted its planning system to accommodate changes in social and health sector structure. The aims of this article are to review changes made in the approach to national immunization planning and to illustrate how these adaptations can help identify future challenges and opportunities for further improving immunization coverage in Cambodia. Sources of information for the study include immunization plans and data from international and national sources, as well as data from the national health information system. Findings of review: Management and service delivery reforms undertaken by the NIP include (1) strengthening links between immunization, health sector and international health planning; (2) development of immunization program multiyear and financial sustainability plans; (3) strengthening of national program decision making structures and processes; (4) widening of decentralized stakeholder participation in health planning; and (5) implementation of service level micro-planning. These management reforms have been associated with significant improvement in public health program performance and outcomes during this period (2003-2006). There has been an increase in vaccination coverage for children under the age of one year, over a five-year period (increase of 29% for fully immunized child at one year of age), with no significant differences in vaccination rates between urban and rural areas, and a sharp decrease in the incidence of vaccine preventable diseases. The NIP is now well positioned to take on additional challenges in coming years associated with expanding international

  8. Experiment plan Sandia oil shale Rock Fragmentation Research Program

    SciTech Connect

    Parrish, R.L.

    1985-04-01

    Sandia National Laboratories is engaged in a program to develop a prescriptive design capability for the in situ recovery of oil from shale. This will provide industry a firm basis for evaluating the technical and economic potential of a given process. Emphasis is being placed on the development of numerical models that, for given site characteristics (material properties, geological structure, etc.), would provide predictions of oil yield for a particular resource. The models include rock fragmentation models that would provide predictions of rubble bed characteristics; these rubble beds would then be evaluated with retort process models for predictions of oil yield. The Rock Fragmentation Research Program being conducted to develop the rock fragmentation models includes field experiments specifically designed to acquire quantitative diagnostic and response measurements for use in the model development. Two well-instrumented single blastwell cratering experiments were conducted in this program during 1983 at the DOE Anvil Points Mine. The Anvil Points Mine was closed in 1984; continuation of the experimental program will be at the Exxon Co., USA Colony Mine. This report describes the test plan for the continuation of the rock fragmentation experiments. A discussion of program objectives and testing philosophy is provided, followed by a description of the experiments thought necessary to accomplish the program objectives. A detailed design and instrumentation plan is provided for the first series of tests to be conducted. 38 refs., 13 figs., 6 tabs.

  9. A Rural Hospice Program: Integrating Social Work Administration, Program Planning, and Direct Services.

    ERIC Educational Resources Information Center

    Wood, Julie E.

    1986-01-01

    Describes multifacted role of a social worker in establishing a rural hospice care program in Cottage Grove, Oregon, a community of 8,000 inhabitants. Discusses program development, planning, coordination, and administration; problem identification and needs assessment; volunteer training; and client assessment and direct services. (NEC)

  10. DOE-owned spent nuclear fuel program plan

    SciTech Connect

    1995-11-01

    The Department of Energy (DOE) has produced spent nuclear fuel (SNF) for many years as part of its various missions and programs. The historical process for managing this SNF was to reprocess it whereby valuable material such as uranium or plutonium was chemically separated from the wastes. These fuels were not intended for long-term storage. As the need for uranium and plutonium decreased, it became necessary to store the SNF for extended lengths of time. This necessity resulted from a 1992 DOE decision to discontinue reprocessing SNF to recover strategic materials (although limited processing of SNF to meet repository acceptance criteria remains under consideration, no plutonium or uranium extraction for other uses is planned). Both the facilities used for storage, and the fuel itself, began experiencing aging from this extended storage. New efforts are now necessary to assure suitable fuel and facility management until long-term decisions for spent fuel disposition are made and implemented. The Program Plan consists of 14 sections as follows: Sections 2--6 describe objectives, management, the work plan, the work breakdown structure, and the responsibility assignment matrix. Sections 7--9 describe the program summary schedules, site logic diagram, SNF Program resource and support requirements. Sections 10--14 present various supplemental management requirements and quality assurance guidelines.

  11. Bibliography: Program-Planning-Budgeting System (PPBS) and Decision-Making, Budgeting and Planning Within the Context of Higher Education.

    ERIC Educational Resources Information Center

    Raider, Melvyn C.

    This document presents a 143-item bibliography concerning program planning budgeting systems and decision making, budgeting, and planning within the context of higher education. Citations are categorized according to books, articles, monographs, reports, and other sources. (MJM)

  12. An impact evaluation of Plan Indonesia's early childhood program.

    PubMed

    Aboud, Frances E; Proulx, Kerrie; Asrilla, Zaitu

    2016-12-27

    High-quality preschools are known to prepare children for success in primary school. Over half of Indonesia's children now pass through preschools whose quality and effectiveness are unknown. Our goal was to evaluate two government preschool models, namely kindergarten (TK) and the less formal health-post (PAUD), with and without capacity-building efforts of a non-governmental organization (NGO-Plan), on children's language and math skills. Thirteen TK and 17 PAUD Plan-supported and the same number of government-supported preschools were randomly selected from East Nusa Tenggara, Indonesia. Five children from each (n = 292) and five who had graduated from each and were now in first grade (n = 241) were randomly selected and tested on language and math measures. The Plan-supported preschools were assessed for quality. Mothers reported on their family's socio-demographic situation and their child's preventive health practices, illnesses and diet over the previous two weeks. Analyses of covariance adjusting for clusters indicated that children attending Plan-supported preschools performed better overall, and especially those in TK preschools. Plan-supported TKs were observed to have higher quality than Plan-supported PAUDs. First graders who graduated from Plan-supported preschools, both TK and PAUD, achieved higher scores on language and math tests than government-supported graduates. Preventive health practices were better in the Plan group, though diet and height-for-age were poor overall. Upgrades to the government preschool program are needed to raise its quality and effectiveness, specifically by introducing a mix of instructional and indoor free-choice play, resources and teacher training to support children's learning.

  13. Self-assessment program implementation plan. Revision A

    SciTech Connect

    Quets, A.L.

    1991-10-23

    This implementation plan identifies and describes the tasks that must be completed in order to successfully implement a Self-Assessment (SA) Program. The purpose of the Self-Assessment Program is to comply with applicable Department of Energy (DOE) directives and orders, Federal, State, and local regulations, operate the Pinellas Plant according to best management practices, and achieve excellence in all operating areas. The Self-Assessment Program will be applied to the Pinellas Plant facility which includes buildings, grounds, equipment, operations, and activities under the control of line management. Furthermore, all applicable disciplines under environmental protection, safety, health and management will be covered by the program. The Self-Assessment Program has been designed to accomplish the following tasks: define the scope of the Self-Assessment Program; assign organizational roles and responsibilities; address EH and S functional elements and management issues; develop a Self-Assessment program charter and policy; identify all applicable EH and S codes, regulations and standards; develop self-assessment procedures and instructions; generate a Self-Assessment Manual; develop a master schedule for facility appraisals and audits; design checklists and report formats for recording appraisal data; implement an assessment tracking and reporting system; implement a root cause analysis and corrective action system; implement a trend analysis and lessons learned system; and establish a formal training program.

  14. DOE Region 6 Radiological Assistance Program plan. Revision 1

    SciTech Connect

    Jakubowski, F.M.

    1995-11-01

    The US Department of Energy (DOE) has sponsored a Radiological Assistance Program (RAP) since the 1950`s. The RAP is designed to make DOE resources available to other DOE facilities, state, tribal, local, private businesses, and individuals for the explicit purpose of assisting during radiological incidents. The DOE has an obligation, through the Atomic Energy Act of 1954, as amended, to provide resources through the Federal Radiological Emergency Response Plan (FRERP, Nov. 1985) in the event of a radiological incident. Toward this end, the RAP program is implemented on a regional basis, and has planned for an incremental response capability with regional coordination between states and DOE response elements. This regional coordination is intended to foster a working relationship between DOE radiological assistance elements and those state, tribal, and local agencies responsible for first response to protect public health and safety.

  15. National Ignition Facility quality assurance program plan revision 2

    SciTech Connect

    Wolfe, C R

    1998-06-01

    NIF Project activities will be conducted in a manner consistent with the guidance and direction of the DOE Order on Quality Assurance (414.1), the LLNL QA Program, and the Laser Directorate QA Plan. Quality assurance criteria will be applied in a graded manner to achieve a balance between the rigor of application of QA measures and the scale, cost, and complexity of the work involved. Accountability for quality is everyone's, extending from the Project Manager through established lines of authority to all Project personnel, who are responsible for the requisite quality of their own work. The NLF QA Program will be implemented by personnel conducting their activities to meet requirements and expectations, according to established plans and procedures that reflect the way business is to be conducted on the Project.

  16. UMTRA Project Office quality assurance program plan. Revision 6

    SciTech Connect

    Not Available

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors.

  17. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    SciTech Connect

    Washington TRU Solutions

    2002-09-24

    U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

  18. Using planned change to implement a pressure sore program.

    PubMed

    Walsh, K C

    1989-08-01

    The establishment of a hospital-wide wound care program is a monumental endeavor requiring mobilization of all available resources. The clinical nurse specialist in a community hospital acted as a change agent to facilitate the formation of a wound care task force, development of wound care protocols and the purchase of wound care products to address the problem of pressure ulcers. With the theory of planned change as a framework, the driving and resisting forces at work are depicted and unanticipated events that speeded and impeded the change process are revealed. Collaboration between nursing and other disciplines is discussed with recommendations offered to other practitioners considering implementation of a wound care program.

  19. Variable Cycle Engine Technology Program Planning and Definition Study

    NASA Technical Reports Server (NTRS)

    Westmoreland, J. S.; Stern, A. M.

    1978-01-01

    The variable stream control engine, VSCE-502B, was selected as the base engine, with the inverted flow engine concept selected as a backup. Critical component technologies were identified, and technology programs were formulated. Several engine configurations were defined on a preliminary basis to serve as demonstration vehicles for the various technologies. The different configurations present compromises in cost, technical risk, and technology return. Plans for possible variably cycle engine technology programs were formulated by synthesizing the technology requirements with the different demonstrator configurations.

  20. Access 5 - Step 1: Human Systems Integration Program Plan (HSIPP)

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This report describes the Human System Interface (HSI) analysis, design and test activities that will be performed to support the development of requirements and design guidelines to facilitate the incorporation of High Altitude Long Endurance (HALE) Remotely Operated Aircraft (ROA) at or above FL400 in the National Airspace System (NAS). These activities are required to support the design and development of safe, effective and reliable ROA operator and ATC interfaces. This plan focuses on the activities to be completed for Step 1 of the ACCESS 5 program. Updates to this document will be made for each of the four ACCESS 5 program steps.

  1. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan. [Contains glossary

    SciTech Connect

    Not Available

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs.

  2. Uses of data to plan cancer prevention and control programs.

    PubMed Central

    Boss, L P; Suarez, L

    1990-01-01

    Seven State health departments, those in Illinois, Nebraska, New Jersey, New York, North Carolina, Texas, and Wisconsin, have participated in an effort to utilize a variety of State-specific cancer-related data to describe the cancer burden in their State's population. The data were then used to develop a statewide cancer plan or supplement an existing plan to address the defined problems. Cancer data have not been well utilized in the planning of intervention programs in the past, and the efforts in these States can serve as models for data use in programs to prevent and control cancer and other chronic diseases. State-specific data can be used to rank needs and make a clear case that can influence decision makers regarding resource allocation. The purpose of this report is to describe the data sources and additional statistics that were used to provide a broad picture of the cancer burden that will aid in targeting and defining intervention needs. Mortality, incidence, risk factor prevalence, and hospital discharge data appear to be the most accessible and potentially useful of the data sources examined, whereas insurance claims data, sources of treatment data, and environmental data bases were less useful in planning intervention strategies. PMID:2116636

  3. Producibility Engineering and Planning (PEP): Program Management Guidelines

    DTIC Science & Technology

    1985-01-01

    design approaches shall be performed, manufacturing technologyI deficiencies addressed, and production risks evaluated for accept- ability...producing and supporting the system, for production surge and industrial mobilization , and for the use of available tools to aggressively manage the plan...complete program is used in addition to a TDP to help new or supplemental manufacturers to support the mobilization base, or for international

  4. The Philippine Population Program strategic plan (1981-1985).

    PubMed

    1980-01-01

    The challenge of the population problem is to effectively mobilize the country's population for productive activity. Rather than simply concern with controlling numbers, emphasis is on human resource management, the structure of employment, labor productivity and income distribution. The long-term Philippine Development Plans reflect recognition of the dynamic interaction between fertility, productivity and welfare. Objectives of the 5-Year Philippine Development Plan 1978-1982, the 10-Year Plan 1978-1987, and the Long-Term Plan to year 2000 integrate population concerns and socioeconomic goals. These objectives include the following: promotion of social development and social justice; attainment of self-sufficiency in food and greater self-reliance in energy; increased development of lagging regions, especially rural areas; improvements of habitat through the development of human settlements and proper management of the environment; and maintenance of population growth at levels conducive to national welfare. Some population concerns that are directly relevant to welfare (in addition to those related to productivity) are distribution patterns of social goods and services, access to services by sectors of the population, and buying power of families. As a total population policy should establish closer linkages, operationally, between the demographic aspects and the productivity and welfare aspects of development, the mission of the National Population Program encompasses 3 areas: fertility; productivity; and welfare. Strategic policies include the following: abortion is unacceptable as a contraceptive method; the population program shall be non-coercive; and the program shall view individual and family welfare in the context and as the main objective of national socioeconomic programs.

  5. Nurse manager residency program: an innovative leadership succession plan.

    PubMed

    Watkins, Amy; Wagner, Jennifer; Martin, Christina; Grant, Brandy; Maule, Katrina; Resh, Kimberly; King, Lisa; Eaton, Holly; Fetter, Katrina; King, Stacey L; Thompson, Elizabeth J

    2014-01-01

    To ensure succession planning within the ranks of nurse managers meet current and projected nursing management needs and organizational goals, we developed and implemented a nurse manager residency program at our hospital. By identifying, supporting, and mentoring clinical experts who express a desire and display an aptitude for nursing leadership, we are graduating individuals who can transition to a nurse manager position with greater ease and competence.

  6. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    SciTech Connect

    Not Available

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER WM) operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs.

  7. ASKyphoplan: a program for deformity planning in ankylosing spondylitis

    PubMed Central

    Scheerder, Famke J.; Jansen, Eric; Smit, Theo H.

    2007-01-01

    A closing wedge osteotomy of the lumbar spine may be considered to correct posture and spinal balance in progressive thoracolumbar kyphotic deformity caused by ankylosing spondylitis (AS). Adequate deformity planning is essential for reliable prediction of the effect of surgical correction of the spine on the sagittal balance and horizontal gaze of the patient. The effect of a spinal osteotomy on the horizontal gaze is equal to the osteotomy angle. However, the effect of a spinal osteotomy on the sagittal balance depends on both the correction angle and the level of osteotomy simultaneously. The relation between the correction angle, the level of osteotomy and the sagittal balance of the spine can be expressed by a mathematical equation. However, this mathematical equation is not easily used in daily practice. We present the computer program ASKyphoplan that analyses and visualizes the planning procedure for sagittal plane corrective osteotomies of the spine in AS. The relationship between the planned correction angle, level of osteotomy and sagittal balance are coupled into the program. The steps taken during an ASKyphoplan run are outlined, and the clinical application is discussed. The application of the program is illustrated by the analysis of the data from a patient recently treated by a lumbar osteotomy in AS. The software can be used free of charge on the internet at http://www.stega.nl under the heading “research” in the menu. PMID:17440752

  8. Global Change Research Program releases new strategic plan

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2012-05-01

    Global Change Research Program releases new strategic plan A new 10-year strategic plan released by the United States Global Change Research Program (USGCRP) on 27 April calls for the federal interagency program to focus on four key goals during 2012-2021 to coordinate federal research efforts related to global change. The goals include advancing scientific knowledge of the integrated natural and human components of the Earth system; providing the scientific basis to inform and enable timely decisions on adaptation and mitigation; building sustained assessment capacity that improves the nation's ability to understand, anticipate, and respond to global change impacts and vulnerabilities; and advancing communications and education to broaden understanding of global change and develop the scientific workforce of the future. The goals and related objectives “recognize that to respond effectively to global change will require a deep understanding of the integrated Earth system—an understanding that incorporates physical, chemical, biological and behavioral information,” the plan states. “It is no longer enough to study the isolated physical, chemical, and biological factors affecting global change,” said USGCRP executive director Tom Armstrong.

  9. 76 FR 50312 - Surface Transportation Environment and Planning Cooperative Research Program (STEP)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... Federal Highway Administration Surface Transportation Environment and Planning Cooperative Research...-LU) established the Surface Transportation Environment and Planning Cooperative Research Program... research on issues related to planning, environment, and realty will be included in future surface...

  10. 77 FR 27756 - Applications for New Awards; Promise Neighborhoods Program-Planning Grant Competition, Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Applications for New Awards; Promise Neighborhoods Program-- Planning Grant Competition, Correction AGENCY... Promise Neighborhoods planning grant competition (2012 Planning Grant NIA). This notice corrects an...

  11. Fish Processed Production Planning Using Integer Stochastic Programming Model

    NASA Astrophysics Data System (ADS)

    Firmansyah, Mawengkang, Herman

    2011-06-01

    Fish and its processed products are the most affordable source of animal protein in the diet of most people in Indonesia. The goal in production planning is to meet customer demand over a fixed time horizon divided into planning periods by optimizing the trade-off between economic objectives such as production cost and customer satisfaction level. The major decisions are production and inventory levels for each product and the number of workforce in each planning period. In this paper we consider the management of small scale traditional business at North Sumatera Province which performs processing fish into several local seafood products. The inherent uncertainty of data (e.g. demand, fish availability), together with the sequential evolution of data over time leads the production planning problem to a nonlinear mixed-integer stochastic programming model. We use scenario generation based approach and feasible neighborhood search for solving the model. The results which show the amount of each fish processed product and the number of workforce needed in each horizon planning are presented.

  12. SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.

    SciTech Connect

    Larsen, Barbara L.

    2005-05-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  13. SNL/CA Environmental Planning and Ecology Program Annual Report 2007.

    SciTech Connect

    Larsen, Barbara L.

    2007-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  14. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    SciTech Connect

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  15. 75 FR 38605 - Surface Transportation Environment and Planning Cooperative Research Program (STEP)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ... to implement this cooperative research program. Due to obligation limitations, recissions, and... Federal Highway Administration Surface Transportation Environment and Planning Cooperative Research...-LU) established the Surface Transportation Environment and Planning Cooperative Research Program...

  16. 75 FR 60465 - Division of Program Coordination, Planning, and Strategic Initiatives, Office of the Director...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Division of Program Coordination, Planning, and Strategic... Secretary, Division of Program Coordination, Planning, and Strategic Initiatives, Office of the Director...

  17. Verification and Planning Based on Coinductive Logic Programming

    NASA Technical Reports Server (NTRS)

    Bansal, Ajay; Min, Richard; Simon, Luke; Mallya, Ajay; Gupta, Gopal

    2008-01-01

    Coinduction is a powerful technique for reasoning about unfounded sets, unbounded structures, infinite automata, and interactive computations [6]. Where induction corresponds to least fixed point's semantics, coinduction corresponds to greatest fixed point semantics. Recently coinduction has been incorporated into logic programming and an elegant operational semantics developed for it [11, 12]. This operational semantics is the greatest fix point counterpart of SLD resolution (SLD resolution imparts operational semantics to least fix point based computations) and is termed co- SLD resolution. In co-SLD resolution, a predicate goal p( t) succeeds if it unifies with one of its ancestor calls. In addition, rational infinite terms are allowed as arguments of predicates. Infinite terms are represented as solutions to unification equations and the occurs check is omitted during the unification process. Coinductive Logic Programming (Co-LP) and Co-SLD resolution can be used to elegantly perform model checking and planning. A combined SLD and Co-SLD resolution based LP system forms the common basis for planning, scheduling, verification, model checking, and constraint solving [9, 4]. This is achieved by amalgamating SLD resolution, co-SLD resolution, and constraint logic programming [13] in a single logic programming system. Given that parallelism in logic programs can be implicitly exploited [8], complex, compute-intensive applications (planning, scheduling, model checking, etc.) can be executed in parallel on multi-core machines. Parallel execution can result in speed-ups as well as in larger instances of the problems being solved. In the remainder we elaborate on (i) how planning can be elegantly and efficiently performed under real-time constraints, (ii) how real-time systems can be elegantly and efficiently model- checked, as well as (iii) how hybrid systems can be verified in a combined system with both co-SLD and SLD resolution. Implementations of co-SLD resolution

  18. Planning, Organizing, and Evaluating Training Programs. Personnel Bibliography Series Number 41.

    ERIC Educational Resources Information Center

    Civil Service Commission, Washington, DC. Library.

    The annotated bibliography is divided into four main sections: planning and administration of training programs, planning and administration of executive development programs, supervisory development programs, and training methods. The first two sections contain subsections on evaluation, Federal programs, and State programs. The third section has…

  19. Report of the Integrated Program Planning Activity for the DOE Fusion Energy Sciences Program

    SciTech Connect

    2000-12-01

    This report of the Integrated Program Planning Activity (IPPA) has been prepared in response to a recommendation by the Secretary of Energy Advisory Board that, ''Given the complex nature of the fusion effort, an integrated program planning process is an absolute necessity.'' We, therefore, undertook this activity in order to integrate the various elements of the program, to improve communication and performance accountability across the program, and to show the inter-connectedness and inter-dependency of the diverse parts of the national fusion energy sciences program. This report is based on the September 1999 Fusion Energy Sciences Advisory Committee's (FESAC) report ''Priorities and Balance within the Fusion Energy Sciences Program''. In its December 5,2000, letter to the Director of the Office of Science, the FESAC has reaffirmed the validity of the September 1999 report and stated that the IPPA presents a framework and process to guide the achievement of the 5-year goals listed in the 1999 report. The National Research Council's (NRC) Fusion Assessment Committee draft final report ''An Assessment of the Department of Energy's Office of Fusion Energy Sciences Program'', reviewing the quality of the science in the program, was made available after the IPPA report had been completed. The IPPA report is, nevertheless, consistent with the recommendations in the NRC report. In addition to program goals and the related 5-year, 10-year, and 15-year objectives, this report elaborates on the scientific issues associated with each of these objectives. The report also makes clear the relationships among the various program elements, and cites these relationships as the reason why integrated program planning is essential. In particular, while focusing on the science conducted by the program, the report addresses the important balances between the science and energy goals of the program, between the MFE and IFE approaches, and between the domestic and international aspects

  20. Planning for a smooth transition: evaluation of a succession planning program for prospective nurse unit managers.

    PubMed

    Manning, Vicki; Jones, Alan; Jones, Pamela; Fernandez, Ritin S

    2015-01-01

    The current and projected nurse workforce shortage has created significant pressure on health care organizations to examine their approach to managing talent. This includes the need for strategic development of new formal leaders. This article reports on a succession planning program for prospective nursing unit managers. Eight prospective management candidates participated in a Future Nursing Unit Managers program. The effectiveness of the program was measured through a comparison of pre- and postprogram surveys relating to participants' perception of personal managerial and leadership skills. Significant differences in scores from baseline to 6-month follow-up surveys were observed in the participants' confidence in undertaking the nursing unit manager role and in their management skills. Investment in structured programs to prepare nurses for leadership roles is strongly recommended as a management workforce strategy.

  1. Superconductivity for electric systems program plan, FY 1996--FY 2000

    SciTech Connect

    1996-03-01

    This describes a comprehensive, integrated approach for the development of HTS (high-temperature superconductivity) technology for cost-effective use in electric power applications. This approach supports the program`s mission: to develop the technology that could lead to industrial commercialization of HTS electric power applications, such as fault-current limiters, motors, generators, transmission cables, superinductors, and superconducting energy storage. The vision is that, by 2010, the US power systems equipment industry will regain a major share of the global market by offering superconducting products that outperform the competition; and in US, the power grid will gain increased efficiency and stability by incorporating many kinds of HTS devices. After an overview and a discussion of the program plan (wires, systems technology, partnership initiative), this document discusses technology status, stakeholders, and the role of US DOE.

  2. NASA's Next Generation Launch Technology Program - Strategy and Plans

    NASA Technical Reports Server (NTRS)

    Hueter, Uwe

    2003-01-01

    The National Aeronautics and Space Administration established a new program office, Next Generation Launch Technology (NGLT) Program Office, last year to pursue technologies for future space launch systems. NGLT will fund research in key technology areas such as propulsion, launch vehicles, operations and system analyses. NGLT is part of NASA s Integrated Space Technology Plan. The NGLT Program is sponsored by NASA s Office of Aerospace Technology and is part of the Space Launch Initiative theme that includes both NGLT and Orbital Space Plane. NGLT will focus on technology development to increase safety and reliability and reduce overall costs associated with building, flying and maintaining the nation s next-generations of space launch vehicles. These investments will be guided by systems engineering and analysis with a focus on the needs of National customers.

  3. Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2

    SciTech Connect

    Not Available

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.

  4. 45 CFR 309.35 - What are the procedures for review of a Tribal IV-D program application, plan or plan amendment?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) The effective date of a plan or plan amendment may not be earlier than the first day of the fiscal... program application, plan or plan amendment? 309.35 Section 309.35 Public Welfare Regulations Relating to... of a Tribal IV-D program application, plan or plan amendment? (a) The Secretary will promptly...

  5. Beyond Instruction. Comprehensive Program Planning for Business and Education. Jossey-Bass Business and Management Series.

    ERIC Educational Resources Information Center

    Rothwell, William J.; Cookson, Peter S.

    This book introduces key issues in program planning as practiced in business and educational settings. Two chapters in part 1 introduce two foundational models--Lifelong Education Program Planning (LEPP) model and Contingency-Based Program Planning--and provide background on models designed by Houle, Knowles, Boyle, and Nadler. Parts 2-5 focus on…

  6. 10 CFR 905.1 - What are the purposes of the Energy Planning and Management Program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... supporting customer integrated resource planning (IRP); demand-side management (DSM), including energy... Management Program? 905.1 Section 905.1 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM General Provisions § 905.1 What are the purposes of the Energy Planning and Management Program?...

  7. Quality Assurance Program Plan for AGR Fuel Development and Qualification Program

    SciTech Connect

    W. Ken Sowder

    2004-02-01

    Quality Assurance Plan (QPP) is to document the Idaho National Engineering and Environmental Laboratory (INEEL) Management and Operating (M&O) Contractor’s quality assurance program for AGR Fuel Development and Qualification activities, which is under the control of the INEEL. The QPP is an integral part of the Gen IV Program Execution Plan (PEP) and establishes the set of management controls for those systems, structures and components (SSCs) and related quality affecting activities, necessary to provide adequate confidence that items will perform satisfactorily in service.

  8. Data Quality Assurance Program Plan for NRC Division of Risk Analysis Programs at the INL

    SciTech Connect

    Sattison, Martin B.; Wierman, Thomas E.; Vedros, Kurt G.; Germain, Shawn W. St.; Eide, Steven A.; Sant, Robert L.

    2009-07-01

    The Division of Risk Analysis (DRA), Office of Nuclear Regulatory Research (RES), must ensure that the quality of the data that feed into its programs follow Office of Management and Budget (OMB) and U.S. Nuclear Regulatory Commission (NRC) guidelines and possibly other standards and guidelines used in nuclear power plant risk analyses. This report documents the steps taken in DRA’s Data Quality Improvement project (Job Control Number N6145) to develop a Data Quality Assurance Program Plan. These steps were 1. Conduct a review of data quality requirements 2. Review current data programs, products, and data quality control activities 3. Review the Institute of Nuclear Power Operation (INPO) Equipment Performance and Information Exchange (EPIX) data quality programs and characterize the EPIX data quality and uncertainty 4. Compare these programs, products, and activities against the requirements 5. Develop a program plan that provides assurance that data quality is being maintained. It is expected that the Data Quality Assurance Program Plan will be routinely implemented in all aspects of future data collection and processing efforts and that specific portions will be executed annually to provide assurance that data quality is being maintained.

  9. Systems autonomy technology: Executive summary and program plan

    NASA Technical Reports Server (NTRS)

    Bull, John S (Editor)

    1987-01-01

    The National Space Strategy approved by the President and Congress in 1984 sets for NASA a major goal of conducting effective and productive space applications and technology programs which contribute materially toward United States leadership and security. To contribute to this goal, OAST supports the Nation's civil and defense space programs and overall economic growth. OAST objectives are to ensure timely provision of new concepts and advanced technologies, to support both the development of NASA missions in space and the space activities of industry and other organizations, to utilize the strengths of universities in conducting the NASA space research and technology program, and to maintain the NASA centers in positions of strength in critical space technology areas. In line with these objectives, NASA has established a new program in space automation and robotics that will result in the development and transfer and automation technology to increase the capabilities, productivity, and safety of NASA space programs including the Space Station, automated space platforms, lunar bases, Mars missions, and other deep space ventures. The NASA/OAST Automation and Robotics program is divided into two parts. Ames Research Center has the lead role in developing and demonstrating System Autonomy capabilities for space systems that need to make their own decisions and do their own planning. The Jet Propulsion Laboratory has the lead role for Telerobotics (that portion of the program that has a strong human operator component in the control loop and some remote handling requirement in space). This program is intended to be a working document for NASA Headquarters, Program Offices, and implementing Project Management.

  10. Draft reclamation program plan for site characterization; Yucca Mountain project

    SciTech Connect

    1989-08-01

    As part of its obligations under the Nuclear Waste Policy Act, as amended, the US Department of Energy (DOE) has developed an environmental program that is to be implemented during site characterization at the Yucca Mountain site. This site is proposed for the location of the nation`s first high-level radioactive waste repository. A program for the reclamation of areas disturbed by site characterization is part of the overall environmental program for that site. This Reclamation Program Plan (RPP) describes the reclamation policy of the DOE for the Yucca Mountain site and presents an overview of the reclamation program. The RPP also provides an overview of the reclamation needs relative to site characterization; a review of legislation and requirements pertinent to reclamation; and a review of previous commitments made by the DOE to certain types of reclamation activities. The objective of the DOE reclamation program at Yucca Mountain is to return land disturbed by site-characterization activities to a stable ecological state with a form and productivity similar to the predisturbance state. The DOE will take all reasonable and necessary steps to achieve this objective. 19 refs., 2 tabs.

  11. Solid waste operations complex engineering verification program plan

    SciTech Connect

    Bergeson, C.L.

    1994-09-28

    This plan supersedes, but does not replace, the previous Waste Receiving and Processing/Solid Waste Engineering Development Program Plan. In doing this, it does not repeat the basic definitions of the various types or classes of development activities nor provide the rigorous written description of each facility and assign the equipment to development classes. The methodology described in the previous document is still valid and was used to determine the types of verification efforts required. This Engineering Verification Program Plan will be updated on a yearly basis. This EVPP provides programmatic definition of all engineering verification activities for the following SWOC projects: (1) Project W-026 - Waste Receiving and Processing Facility Module 1; (2) Project W-100 - Waste Receiving and Processing Facility Module 2A; (3) Project W-112 - Phase V Storage Facility; and (4) Project W-113 - Solid Waste Retrieval. No engineering verification activities are defined for Project W-112 as no verification work was identified. The Acceptance Test Procedures/Operational Test Procedures will be part of each project`s Title III operation test efforts. The ATPs/OTPs are not covered by this EVPP.

  12. Orbital rendezvous mission planning using mixed integer nonlinear programming

    NASA Astrophysics Data System (ADS)

    Zhang, Jin; Tang, Guo-jin; Luo, Ya-Zhong; Li, Hai-yang

    2011-04-01

    The rendezvous and docking mission is usually divided into several phases, and the mission planning is performed phase by phase. A new planning method using mixed integer nonlinear programming, which investigates single phase parameters and phase connecting parameters simultaneously, is proposed to improve the rendezvous mission's overall performance. The design variables are composed of integers and continuous-valued numbers. The integer part consists of the parameters for station-keeping and sensor-switching, the number of maneuvers in each rendezvous phase and the number of repeating periods to start the rendezvous mission. The continuous part consists of the orbital transfer time and the station-keeping duration. The objective function is a combination of the propellant consumed, the sun angle which represents the power available, and the terminal precision of each rendezvous phase. The operational requirements for the spacecraft-ground communication, sun illumination and the sensor transition are considered. The simple genetic algorithm, which is a combination of the integer-coded and real-coded genetic algorithm, is chosen to obtain the optimal solution. A practical rendezvous mission planning problem is solved by the proposed method. The results show that the method proposed can solve the integral rendezvous mission planning problem effectively, and the solution obtained can satisfy the operational constraints and has a good overall performance.

  13. Tank waste remediation system vadose zone program plan

    SciTech Connect

    Fredenburg, E.A.

    1998-07-27

    The objective of the vadose zone characterization under this program is to develop a better conceptual geohydrologic model of identified tank farms which will be characterized so that threats to human health and the environment from past leaks and spills, intentional liquid discharges, potential future leaks during retrieval, and from residual contaminants that may remain in tank farms at closure can be explicitly addressed in decision processes. This model will include geologic, hydrologic, and hydrochemical parameters as defined by the requirements of each of the TWRS programs identified here. The intent of this TWRS Vadose Zone Program Plan is to provide justification and an implementation plan for the following activities: Develop a sufficient understanding of subsurface conditions and transport processes to support decisions on management, cleanup, and containment of past leaks, spills, and intentional liquid discharges; Develop a sufficient understanding of transport processes to support decisions on controlling potential retrieval leaks; Develop a sufficient understanding of transport processes to support decisions on tank farm closure, including allowable residual waste that may remain at closure; and Provide new information on geotechnical properties in the 200 Area to supplement data used for design and performance assessment for immobilized low-activity waste disposal facilities.

  14. Human Research Program Integrated Research Plan. Revision C

    NASA Technical Reports Server (NTRS)

    Steinberg, Susan

    2011-01-01

    Crew health and performance are critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes (1) HRP's approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and (2) the method of integration for risk mitigation. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.

  15. Project Hanford Management Contract (PHMC) pollution prevention program implementation plan

    SciTech Connect

    Place, B.G., Westinghouse Hanford

    1996-12-31

    This plan documents the Project Hanford Management Contract (PHMC) Pollution Prevention/Waste Minimization (P2/WMin) Program. The subject implementation plan has been updated to reflect the Fiscal Year (FY) 1997 contract structure in which Fluor Daniel Hanford, Inc. (FDH) is the management and integration contractor. The P2/WMin Program scope includes FDH as the principal PHMC contractor, and B&W Hanford Company (BWHC), Duke Engineering & Services Hanford, Inc. (DESH), Lockheed Martin Hanford Corporation, (LMHC), Numatec Hanford Corporation (NHC), Rust Federal Services of Hanford, Inc. (RFSH), and DynCorp Tri-Cities Services, Inc. (DYN) as PHMC contractors, as well as subcontracting enterprise companies, such as Fluor Daniel Northwest, Inc. (FDNW), Lockheed Martin Services, Inc. (LMSI), and Rust Federal Services Northwest (RFS), which provide engineering, operation, construction, maintenance, and computer services for the Hanford Site. The P2/WMin Program scope also includes all other subcontractor-affiliated enterprise companies, such as B&W Protec, Inc. (BWP), DE&S Northwest, Inc. (DESNW), and SGN Eurisys Services Corp. (SESC).

  16. Risk communications and the Chemical Stockpile Emergency-Planning Program

    SciTech Connect

    Vogt, B.M.; Sorensen, J.H.

    1994-09-01

    The CSEPP (Chemical Stockpile Emergency Preparedness Program) was created to improve emergency planning and response capabilities at the eight sites around the country that store chemical weapons. These weapons are scheduled to be destroyed in the near future. In preparation of the Draft Programmatic Environmental Impact Statement (DPEIS) for the Chemical Stockpile Disposal Program (CSDP), it was proposed that the Army mitigate accidents through an enhanced community emergency preparedness program at the eight storage sites. In 1986, the Army initiated the development of an Emergency Response Concept Plan (ERCP) for the CSDP, one of 12 technical support studies conducted during preparation of the Final Programmatic Environmental Impact Statement (FPEIS). The purpose of this document is to provide a fairly comprehensive source book on risk, risk management, risk communication research and recommended risk communication practices. It does not merely summarize each publication in the risk communication literature, but attempts to synthesize them along the lines of a set of organizing principles. Furthermore, it is not intended to duplicate other guidance manuals (such as Covello et al.`s manual on risk comparison). The source book was developed for the CSEPP in support of the training module on risk communications. Although the examples provided are specific to CSEPP, its use goes beyond that of CSEPP as the findings apply to a broad spectrum of risk communication topics. While the emphasis is on communication in emergency preparedness and response specific to the CSEPP, the materials cover other non-emergency communication settings. 329 refs.

  17. National Program Plan Fuel Cells in Transportation. Executive Summary

    SciTech Connect

    Not Available

    1993-02-01

    Fuel cells are being developed for application in the transportation sector because they will convert hydrogen to electric power at high efficiencies with virtually no detrimental environmental impact. To realize these energy, environmental, and economic benefits, developers of FCVs need to (1) reduce the size and weight of current designs, (2) develop fuel cell propulsion systems with rapid start-up and greater load-following capability, (3) reduce system cost and/or improve performance, and (4) utilize alternative fuels to a large extent. This Plan addresses the FCV-related requirements of the Energy Act, describing a development program for light- and heavy-duty propulsion systems, a basic R&D program on fuel cell technology that is separate from, but feeds into, the system development activities, and supporting analyses. Implementation of the Program Plan by means of industry/government alliances will accelerate the commercialization of FCVs. In the long term, the successful deployment of large numbers of FCVs promises to eliminate the transportation sector as a major contributor to the nation`s environmental problems.

  18. A methodology for comprehensive strategic planning and program prioritization

    NASA Astrophysics Data System (ADS)

    Raczynski, Christopher Michael

    2008-10-01

    This process developed in this work, Strategy Optimization for the Allocation of Resources (SOAR), is a strategic planning methodology based off Integrated Product and Process Development and systems engineering techniques. Utilizing a top down approach, the process starts with the creation of the organization vision and its measures of effectiveness. These measures are prioritized based on their application to external world scenarios which will frame the future. The programs which will be used to accomplish this vision are identified by decomposing the problem. Information is gathered on the programs as to the application, cost, schedule, risk, and other pertinent information. The relationships between the levels of the hierarchy are mapped utilizing subject matter experts. These connections are then utilized to determine the overall benefit of the programs to the vision of the organization. Through a Multi-Objective Genetic Algorithm a tradespace of potential program portfolios can be created amongst which the decision maker can allocate resources. The information and portfolios are presented to the decision maker through the use of a Decision Support System which collects and visualizes all the data in a single location. This methodology was tested utilizing a science and technology planning exercise conducted by the United States Navy. A thorough decomposition was defined and technology programs identified which had the potential to provide benefit to the vision. The prioritization of the top level capabilities was performed through the use of a rank ordering scheme and a previous naval application was used to demonstrate a cumulative voting scheme. Voting was performed utilizing the Nominal Group Technique to capture the relationships between the levels of the hierarchy. Interrelationships between the technologies were identified and a MOGA was utilized to optimize portfolios with respect to these constraints and information was placed in a DSS. This

  19. HTGR Spent Fuel Treatment Program. HTGR Spent Fuel Treatment Development Program Plan

    SciTech Connect

    Not Available

    1984-12-01

    The spent fuel treatment (SFT) program plan addresses spent fuel volume reduction, packaging, storage, transportation, fuel recovery, and disposal to meet the needs of the HTGR Lead Plant and follow-on plants. In the near term, fuel refabrication will be addressed by following developments in fresh fuel fabrication and will be developed in the long term as decisions on the alternatives dictate. The formulation of this revised program plan considered the implications of the Nuclear Waste Policy Act of 1982 (NWPA) which, for the first time, established a definitive national policy for management and disposal of nuclear wastes. Although the primary intent of the program is to address technical issues, the divergence between commercial and government interests, which arises as a result of certain provisions of the NWPA, must be addressed in the economic assessment of technically feasible alternative paths in the management of spent HTGR fuel and waste. This new SFT program plan also incorporates a significant cooperative research and development program between the United States and the Federal Republic of Germany. The major objective of this international program is to reduce costs by avoiding duplicate efforts.

  20. Using the Program Sustainability Assessment Tool to assess and plan for sustainability.

    PubMed

    Calhoun, Annaliese; Mainor, Avia; Moreland-Russell, Sarah; Maier, Ryan C; Brossart, Laura; Luke, Douglas A

    2014-01-23

    Implementing and growing a public health program that benefits society takes considerable time and effort. To ensure that positive outcomes are maintained over time, program managers and stakeholders should plan and implement activities to build sustainability capacity within their programs. We describe a 3-part sustainability planning process that programs can follow to build their sustainability capacity. First, program staff and stakeholders take the Program Sustainability Assessment Tool to measure their program's sustainability across 8 domains. Next, managers and stakeholders use results from the assessment to inform and prioritize sustainability action planning. Lastly, staff members implement the plan and keep track of progress toward their sustainability goals. Through this process, staff can more holistically address the internal and external challenges and pressures associated with sustaining a program. We include a case example of a chronic disease program that completed the Program Sustainability Assessment Tool and engaged in program sustainability planning.