Sample records for project selection process

  1. Systemic safety project selection tool.

    DOT National Transportation Integrated Search

    2013-07-01

    "The Systemic Safety Project Selection Tool presents a process for incorporating systemic safety planning into traditional safety management processes. The Systemic Tool provides a step-by-step process for conducting systemic safety analysis; conside...

  2. Defense Infrastructure: DOD Needs Clearer Guidance on Notifying Congress of Privately Financed Construction Projects

    DTIC Science & Technology

    2017-01-01

    fast food restaurants . Because these projects are not authorized and funded through the regular appropriations process for military construction...750,000 threshold for major projects. 5We selected this sample by identifying one project of each type—commissary; exchange; morale, welfare, and...of 212 possible projects. Further details of our selection process are found in appendix I. Page 3 GAO-17-76 Nonappropriated Fund

  3. A contrast between DEMATEL-ANP and ANP methods for six sigma project selection: a case study in healthcare industry.

    PubMed

    Ortíz, Miguel A; Felizzola, Heriberto A; Nieto Isaza, Santiago

    2015-01-01

    The project selection process is a crucial step for healthcare organizations at the moment of implementing six sigma programs in both administrative and caring processes. However, six-sigma project selection is often defined as a decision making process with interaction and feedback between criteria; so that it is necessary to explore different methods to help healthcare companies to determine the Six-sigma projects that provide the maximum benefits. This paper describes the application of both ANP (Analytic Network process) and DEMATEL (Decision Making trial and evaluation laboratory)-ANP in a public medical centre to establish the most suitable six sigma project and finally, these methods were compared to evaluate their performance in the decision making process. ANP and DEMATEL-ANP were used to evaluate 6 six sigma project alternatives under an evaluation model composed by 3 strategies, 4 criteria and 15 sub-criteria. Judgement matrixes were completed by the six sigma team whose participants worked in different departments of the medical centre. The improving of care opportunity in obstetric outpatients was elected as the most suitable six sigma project with a score of 0,117 as contribution to the organization goals. DEMATEL-ANP performed better at decision making process since it reduced the error probability due to interactions and feedback. ANP and DEMATEL-ANP effectively supported six sigma project selection processes, helping to create a complete framework that guarantees the prioritization of projects that provide maximum benefits to healthcare organizations. As DEMATEL- ANP performed better, it should be used by practitioners involved in decisions related to the implementation of six sigma programs in healthcare sector accompanied by the adequate identification of the evaluation criteria that support the decision making model. Thus, this comparative study contributes to choosing more effective approaches in this field. Suggestions of further work are also proposed so that these methods can be applied more adequate in six sigma project selection processes in healthcare.

  4. A contrast between DEMATEL-ANP and ANP methods for six sigma project selection: a case study in healthcare industry

    PubMed Central

    2015-01-01

    Background The project selection process is a crucial step for healthcare organizations at the moment of implementing six sigma programs in both administrative and caring processes. However, six-sigma project selection is often defined as a decision making process with interaction and feedback between criteria; so that it is necessary to explore different methods to help healthcare companies to determine the Six-sigma projects that provide the maximum benefits. This paper describes the application of both ANP (Analytic Network process) and DEMATEL (Decision Making trial and evaluation laboratory)-ANP in a public medical centre to establish the most suitable six sigma project and finally, these methods were compared to evaluate their performance in the decision making process. Methods ANP and DEMATEL-ANP were used to evaluate 6 six sigma project alternatives under an evaluation model composed by 3 strategies, 4 criteria and 15 sub-criteria. Judgement matrixes were completed by the six sigma team whose participants worked in different departments of the medical centre. Results The improving of care opportunity in obstetric outpatients was elected as the most suitable six sigma project with a score of 0,117 as contribution to the organization goals. DEMATEL-ANP performed better at decision making process since it reduced the error probability due to interactions and feedback. Conclusions ANP and DEMATEL-ANP effectively supported six sigma project selection processes, helping to create a complete framework that guarantees the prioritization of projects that provide maximum benefits to healthcare organizations. As DEMATEL- ANP performed better, it should be used by practitioners involved in decisions related to the implementation of six sigma programs in healthcare sector accompanied by the adequate identification of the evaluation criteria that support the decision making model. Thus, this comparative study contributes to choosing more effective approaches in this field. Suggestions of further work are also proposed so that these methods can be applied more adequate in six sigma project selection processes in healthcare. PMID:26391445

  5. Combinatorial Optimization in Project Selection Using Genetic Algorithm

    NASA Astrophysics Data System (ADS)

    Dewi, Sari; Sawaluddin

    2018-01-01

    This paper discusses the problem of project selection in the presence of two objective functions that maximize profit and minimize cost and the existence of some limitations is limited resources availability and time available so that there is need allocation of resources in each project. These resources are human resources, machine resources, raw material resources. This is treated as a consideration to not exceed the budget that has been determined. So that can be formulated mathematics for objective function (multi-objective) with boundaries that fulfilled. To assist the project selection process, a multi-objective combinatorial optimization approach is used to obtain an optimal solution for the selection of the right project. It then described a multi-objective method of genetic algorithm as one method of multi-objective combinatorial optimization approach to simplify the project selection process in a large scope.

  6. 50 CFR 86.61 - What process does the Service use to select projects for grants?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false What process does the Service use to....61 What process does the Service use to select projects for grants? The Service's Division of Federal... SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION...

  7. Transportation infrastructure : review of project selection process for five FHWA discretionary programs

    DOT National Transportation Integrated Search

    1997-11-01

    DOT uses a two-phase process for selecting and funding transportation : projects for the five discretionary programs we reviewed. In the first : phase, FHWA program staff in the field and headquarters compile and : evaluate the applications that stat...

  8. 77 FR 43184 - Allocation of Capacity on New Merchant Transmission Projects and New Cost-Based, Participant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... a report with the Commission describing the solicitation, selection and negotiation process. The... report to the Commission describing the solicitation, selection and negotiation process. The Commission... allocate 100 percent of their projects' capacity through bilateral negotiations with identified customers...

  9. Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method

    NASA Astrophysics Data System (ADS)

    Alptekin, Orkun; Alptekin, Nesrin

    2017-10-01

    Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.

  10. Process Acceptance and Adoption by IT Software Project Practitioners

    ERIC Educational Resources Information Center

    Guardado, Deana R.

    2012-01-01

    This study addresses the question of what factors determine acceptance and adoption of processes in the context of Information Technology (IT) software development projects. This specific context was selected because processes required for managing software development projects are less prescriptive than in other, more straightforward, IT…

  11. A novel evaluation method for building construction project based on integrated information entropy with reliability theory.

    PubMed

    Bai, Xiao-ping; Zhang, Xi-wei

    2013-01-01

    Selecting construction schemes of the building engineering project is a complex multiobjective optimization decision process, in which many indexes need to be selected to find the optimum scheme. Aiming at this problem, this paper selects cost, progress, quality, and safety as the four first-order evaluation indexes, uses the quantitative method for the cost index, uses integrated qualitative and quantitative methodologies for progress, quality, and safety indexes, and integrates engineering economics, reliability theories, and information entropy theory to present a new evaluation method for building construction project. Combined with a practical case, this paper also presents detailed computing processes and steps, including selecting all order indexes, establishing the index matrix, computing score values of all order indexes, computing the synthesis score, sorting all selected schemes, and making analysis and decision. Presented method can offer valuable references for risk computing of building construction projects.

  12. A Framework for Six Sigma Project Selection in Higher Educational Institutions, Using a Weighted Scorecard Approach

    ERIC Educational Resources Information Center

    Holmes, Monica C.; Jenicke, Lawrence O.; Hempel, Jessica L.

    2015-01-01

    Purpose: This paper discusses the importance of the Six Sigma selection process, describes a Six Sigma project in a higher educational institution and presents a weighted scorecard approach for project selection. Design/Methodology/Approach: A case study of the Six Sigma approach being used to improve student support at a university computer help…

  13. Priority programming for highway project selections.

    DOT National Transportation Integrated Search

    1981-01-01

    This report provides an introduction to the methodologies of priority programming as developed by state transportation departments in their highway and transportation project selection processes. It explains the interrelationships between needs studi...

  14. Automated Array Assembly, Phase 2. Low-cost Solar Array Project, Task 4

    NASA Technical Reports Server (NTRS)

    Lopez, M.

    1978-01-01

    Work was done to verify the technological readiness of a select process sequence with respect to satisfying the Low Cost Solar Array Project objectives of meeting the designated goals of $.50 per peak watt in 1986 (1975 dollars). The sequence examined consisted of: (1) 3 inches diameter as-sawn Czochralski grown 1:0:0 silicon, (2) texture etching, (3) ion implanting, (4) laser annealing, (5) screen printing of ohmic contacts and (6) sprayed anti-reflective coatings. High volume production projections were made on the selected process sequence. Automated processing and movement of hardware at high rates were conceptualized to satisfy the PROJECT's 500 MW/yr capability. A production plan was formulated with flow diagrams integrating the various processes in the cell fabrication sequence.

  15. Computer Aided Management for Information Processing Projects.

    ERIC Educational Resources Information Center

    Akman, Ibrahim; Kocamustafaogullari, Kemal

    1995-01-01

    Outlines the nature of information processing projects and discusses some project management programming packages. Describes an in-house interface program developed to utilize a selected project management package (TIMELINE) by using Oracle Data Base Management System tools and Pascal programming language for the management of information system…

  16. Special Advanced Studies for Pollution Prevention. Delivery Order 0058: The Monitor - Spring 2000

    DTIC Science & Technology

    2001-04-01

    Process complexity ➨ Strippability ➨ Maturity ➨ Process type and chemistry ➨ Licensing requirements ➨ Vendor information ➨ Niplate 700 (Surface...Courses of Action 4 Identify & Evaluate Potential Alternatives 5 Select Best Alternative & Develop Project 6 Prioritize Projects by Commodity 7 Rank...Burden CS Priority Process Specific P2 OASolution Selection Solution Planning Solution Implementation Solution Evaluation Phase 2 Phase 3 Phase 1

  17. A genetic fuzzy analytical hierarchy process based projection pursuit method for selecting schemes of water transportation projects

    NASA Astrophysics Data System (ADS)

    Jin, Juliang; Li, Lei; Wang, Wensheng; Zhang, Ming

    2006-10-01

    The optimal selection of schemes of water transportation projects is a process of choosing a relatively optimal scheme from a number of schemes of water transportation programming and management projects, which is of importance in both theory and practice in water resource systems engineering. In order to achieve consistency and eliminate the dimensions of fuzzy qualitative and fuzzy quantitative evaluation indexes, to determine the weights of the indexes objectively, and to increase the differences among the comprehensive evaluation index values of water transportation project schemes, a projection pursuit method, named FPRM-PP for short, was developed in this work for selecting the optimal water transportation project scheme based on the fuzzy preference relation matrix. The research results show that FPRM-PP is intuitive and practical, the correction range of the fuzzy preference relation matrix A it produces is relatively small, and the result obtained is both stable and accurate; therefore FPRM-PP can be widely used in the optimal selection of different multi-factor decision-making schemes.

  18. Selecting Health Care Improvement Projects: A Methodology Integrating Cause-and-Effect Diagram and Analytical Hierarchy Process.

    PubMed

    Testik, Özlem Müge; Shaygan, Amir; Dasdemir, Erdi; Soydan, Guray

    It is often vital to identify, prioritize, and select quality improvement projects in a hospital. Yet, a methodology, which utilizes experts' opinions with different points of view, is needed for better decision making. The proposed methodology utilizes the cause-and-effect diagram to identify improvement projects and construct a project hierarchy for a problem. The right improvement projects are then prioritized and selected using a weighting scheme of analytical hierarchy process by aggregating experts' opinions. An approach for collecting data from experts and a graphical display for summarizing the obtained information are also provided. The methodology is implemented for improving a hospital appointment system. The top-ranked 2 major project categories for improvements were identified to be system- and accessibility-related causes (45%) and capacity-related causes (28%), respectively. For each of the major project category, subprojects were then ranked for selecting the improvement needs. The methodology is useful in cases where an aggregate decision based on experts' opinions is expected. Some suggestions for practical implementations are provided.

  19. Selected US building industry processes and characteristics. A Project SAGE report

    NASA Technical Reports Server (NTRS)

    Barbieri, R. H.; Schoen, R.

    1978-01-01

    Selected multifamily processes were examined using a primarily graphic approach to clarify some of the operational modes into which Project SAGE (solar-assisted gas energy) must fit, both as a product and a process in the U.S. building industry. What SAGE must have or do in order to fit the building industry in the short term, that is, the multifamily submarket as it is presently configured, is delineated.

  20. Selection of Construction Methods: A Knowledge-Based Approach

    PubMed Central

    Skibniewski, Miroslaw

    2013-01-01

    The appropriate selection of construction methods to be used during the execution of a construction project is a major determinant of high productivity, but sometimes this selection process is performed without the care and the systematic approach that it deserves, bringing negative consequences. This paper proposes a knowledge management approach that will enable the intelligent use of corporate experience and information and help to improve the selection of construction methods for a project. Then a knowledge-based system to support this decision-making process is proposed and described. To define and design the system, semistructured interviews were conducted within three construction companies with the purpose of studying the way that the method' selection process is carried out in practice and the knowledge associated with it. A prototype of a Construction Methods Knowledge System (CMKS) was developed and then validated with construction industry professionals. As a conclusion, the CMKS was perceived as a valuable tool for construction methods' selection, by helping companies to generate a corporate memory on this issue, reducing the reliance on individual knowledge and also the subjectivity of the decision-making process. The described benefits as provided by the system favor a better performance of construction projects. PMID:24453925

  1. Innovative Instruction in Higher Education: Thirty Exemplary Projects Conducted in Selected Institutions of Post-Secondary Education--State of Oregon.

    ERIC Educational Resources Information Center

    Harper, Ronald; And Others

    This manual reviews thirty projects selected by the Oregon Educational Coordinating Council (ECC) as exemplary in method, operation, and development. The projects are organized into 9 broad classifications: large group-small group alternatives, autotutorial programmed instruction, process centered, computer and simulation, on-site/field study,…

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Szoka de Valladares, M.R.; Mack, S.

    The DOE Hydrogen Program needs to develop criteria as part of a systematic evaluation process for proposal identification, evaluation and selection. The H Scan component of this process provides a framework in which a project proposer can fully describe their candidate technology system and its components. The H Scan complements traditional methods of capturing cost and technical information. It consists of a special set of survey forms designed to elicit information so expert reviewers can assess the proposal relative to DOE specified selection criteria. The Analytic Hierarchy Process (AHP) component of the decision process assembles the management defined evaluation andmore » selection criteria into a coherent multi-level decision construct by which projects can be evaluated in pair-wise comparisons. The AHP model will reflect management`s objectives and it will assist in the ranking of individual projects based on the extent to which each contributes to management`s objectives. This paper contains a detailed description of the products and activities associated with the planning and evaluation process: The objectives or criteria; the H Scan; and The Analytic Hierarchy Process (AHP).« less

  3. Funding Solar Projects at Federal Agencies: Mechanisms and Selection Criteria (Brochure)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Implementing solar energy projects at federal facilities is a process. The project planning phase of the process includes determining goals, building a team, determining site feasibility and selecting the appropriate project funding tool. This fact sheet gives practical guidance to assist decision-makers with understanding and selecting the funding tool that would best address their site goals. Because project funding tools are complex, federal agencies should seek project assistance before making final decisions. High capital requirements combined with limits on federal agency energy contracts create challenges for funding solar projects. Solar developers typically require long-term contracts (15-20) years to spread outmore » the initial investment and to enable payments similar to conventional utility bill payments. In the private sector, 20-year contracts have been developed, vetted, and accepted, but the General Services Administration (GSA) contract authority (federal acquisition regulation [FAR] part 41) typically limits contract terms to 10 years. Payments on shorter-term contracts make solar economically unattractive compared with conventional generation. However, in several instances, the federal sector has utilized innovative funding tools that allow long-term contracts or has created a project package that is economically attractive within a shorter contract term.« less

  4. Chapter 3: Design of the Saber-Tooth Project.

    ERIC Educational Resources Information Center

    Ward, Phillip

    1999-01-01

    Used data from interviews, surveys, and document analysis to describe the methods and reform processes of the Saber Tooth Project, examining selection of sites; demographics (school sites, teachers, data sources, and project assumptions); and project phases (development, planning, implementation, and support). The project's method of reform was…

  5. Establishing Foundations for University/Professional Association Collaboration: The Profession Selection Process.

    ERIC Educational Resources Information Center

    Queeney, Donna S.; Melander, Jacqueline J.

    The selection of professions that became part of the Continuing Professional Education Development Project, a joint research and development effort of The Pennsylvania State University and the Kellogg Foundation, is discussed. In addition to establishing collaboration between the university and the professions, the project sought to develop and…

  6. A game-based decision support methodology for competitive systems design

    NASA Astrophysics Data System (ADS)

    Briceno, Simon Ignacio

    This dissertation describes the development of a game-based methodology that facilitates the exploration and selection of research and development (R&D) projects under uncertain competitive scenarios. The proposed method provides an approach that analyzes competitor positioning and formulates response strategies to forecast the impact of technical design choices on a project's market performance. A critical decision in the conceptual design phase of propulsion systems is the selection of the best architecture, centerline, core size, and technology portfolio. This selection can be challenging when considering evolving requirements from both the airframe manufacturing company and the airlines in the market. Furthermore, the exceedingly high cost of core architecture development and its associated risk makes this strategic architecture decision the most important one for an engine company. Traditional conceptual design processes emphasize performance and affordability as their main objectives. These areas alone however, do not provide decision-makers with enough information as to how successful their engine will be in a competitive market. A key objective of this research is to examine how firm characteristics such as their relative differences in completing R&D projects, differences in the degree of substitutability between different project types, and first/second-mover advantages affect their product development strategies. Several quantitative methods are investigated that analyze business and engineering strategies concurrently. In particular, formulations based on the well-established mathematical field of game theory are introduced to obtain insights into the project selection problem. The use of game theory is explored in this research as a method to assist the selection process of R&D projects in the presence of imperfect market information. The proposed methodology focuses on two influential factors: the schedule uncertainty of project completion times and the uncertainty associated with competitive reactions. A normal-form matrix is created to enumerate players, their moves and payoffs, and to formulate a process by which an optimal decision can be achieved. The non-cooperative model is tested using the concept of a Nash equilibrium to identify potential strategies that are robust to uncertain market fluctuations (e.g: uncertainty in airline demand, airframe requirements and competitor positioning). A first/second-mover advantage parameter is used as a scenario dial to adjust market rewards and firms' payoffs. The methodology is applied to a commercial aircraft engine selection study where engine firms must select an optimal engine project for development. An engine modeling and simulation framework is developed to generate a broad engine project portfolio. The creation of a customer value model enables designers to incorporate airline operation characteristics into the engine modeling and simulation process to improve the accuracy of engine/customer matching. Summary. Several key findings are made that provide recommendations on project selection strategies for firms uncertain as to when they will enter the market. The proposed study demonstrates that within a technical design environment, a rational and analytical means of modeling project development strategies is beneficial in high market risk situations.

  7. Evaluation of ERDA-sponsored coal feed system development

    NASA Technical Reports Server (NTRS)

    Phen, R. L.; Luckow, W. K.; Mattson, L.; Otth, D.; Tsou, P.

    1977-01-01

    Coal feeders were evaluated based upon criteria such as technical feasibility, performance (i.e. ability to meet process requirements), projected life cycle costs, and projected development cost. An initial set of feeders was selected based on the feeders' cost savings potential compared with baseline lockhopper systems. Additional feeders were considered for selection based on: (1) increasing the probability of successful feeder development; (2) application to specific processes; and (3) technical merit. A coal feeder development program is outlined.

  8. 24 CFR 1003.303 - Project rating.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project rating. 1003.303 Section... Application and Selection Process § 1003.303 Project rating. Each project included in an application that... problem. This factor will address the extent to which there is a need for the proposed project to address...

  9. 24 CFR 1003.303 - Project rating.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project rating. 1003.303 Section... Application and Selection Process § 1003.303 Project rating. Each project included in an application that... problem. This factor will address the extent to which there is a need for the proposed project to address...

  10. 24 CFR 1003.303 - Project rating.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project rating. 1003.303 Section... Application and Selection Process § 1003.303 Project rating. Each project included in an application that... problem. This factor will address the extent to which there is a need for the proposed project to address...

  11. 24 CFR 1003.303 - Project rating.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Project rating. 1003.303 Section... Application and Selection Process § 1003.303 Project rating. Each project included in an application that... problem. This factor will address the extent to which there is a need for the proposed project to address...

  12. Target dependence of orientation and direction selectivity of corticocortical projection neurons in the mouse V1

    PubMed Central

    Matsui, Teppei; Ohki, Kenichi

    2013-01-01

    Higher order visual areas that receive input from the primary visual cortex (V1) are specialized for the processing of distinct features of visual information. However, it is still incompletely understood how this functional specialization is acquired. Here we used in vivo two photon calcium imaging in the mouse visual cortex to investigate whether this functional distinction exists at as early as the level of projections from V1 to two higher order visual areas, AL and LM. Specifically, we examined whether sharpness of orientation and direction selectivity and optimal spatial and temporal frequency of projection neurons from V1 to higher order visual areas match with that of target areas. We found that the V1 input to higher order visual areas were indeed functionally distinct: AL preferentially received inputs from V1 that were more orientation and direction selective and tuned for lower spatial frequency compared to projection of V1 to LM, consistent with functional differences between AL and LM. The present findings suggest that selective projections from V1 to higher order visual areas initiates parallel processing of sensory information in the visual cortical network. PMID:24068987

  13. 39 CFR 778.7 - How does the Postal Service communicate with state and local officials concerning the Postal...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... notice directly to affected state, areawide, regional, and local entities in a state of a proposed direct Federal development project if: (1) The state has not adopted a process under the Order; or (2) The development project involves a facility project action category not selected for the state process. This...

  14. Current Research on Relationships between Selected Higher Order Processes and the Communication Skills and Problems of Deaf Persons.

    ERIC Educational Resources Information Center

    Metz, Dale Evan; And Others

    1980-01-01

    The paper presents four research projects in process in the Communication Sciences Laboratory at the National Technical Institute for the Deaf. These projects illustrate four broad areas of research on the relationships between higher order information processing systems and the communication skills and problems exhibited by deaf people. (Author)

  15. Methodical bases of selection and evaluation of the effectiveness of the projects of the urban territory renovation

    NASA Astrophysics Data System (ADS)

    Sizova, Evgeniya; Zhutaeva, Evgeniya; Chugunov, Andrei

    2018-03-01

    The article highlights features of processes of urban territory renovation from the perspective of a commercial entity participating in the implementation of a project. The requirements of high-rise construction projects to the entities, that carry out them, are considered. The advantages of large enterprises as participants in renovation projects are systematized, contributing to their most efficient implementation. The factors, which influence the success of the renovation projects, are presented. A method for selecting projects for implementation based on criteria grouped by qualitative characteristics and contributing to the most complete and comprehensive evaluation of the project is suggested. Patterns to prioritize and harmonize renovation projects in terms of multi-project activity of the enterprise are considered.

  16. 14 CFR 1274.203 - Solicitations/cooperative agreement notices.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... other criteria that will be evaluated during the selection process. (c) For its research projects, NASA may publish the expected project goals and objectives in terms of “What” the commercial recipient is... to the success of the project, for some projects the recipient's statement of work may be included as...

  17. 14 CFR 1274.203 - Solicitations/cooperative agreement notices.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... other criteria that will be evaluated during the selection process. (c) For its research projects, NASA may publish the expected project goals and objectives in terms of “What” the commercial recipient is... to the success of the project, for some projects the recipient's statement of work may be included as...

  18. 14 CFR 1274.203 - Solicitations/cooperative agreement notices.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... other criteria that will be evaluated during the selection process. (c) For its research projects, NASA may publish the expected project goals and objectives in terms of “What” the commercial recipient is... to the success of the project, for some projects the recipient's statement of work may be included as...

  19. The use of process mapping in healthcare quality improvement projects.

    PubMed

    Antonacci, Grazia; Reed, Julie E; Lennox, Laura; Barlow, James

    2018-05-01

    Introduction Process mapping provides insight into systems and processes in which improvement interventions are introduced and is seen as useful in healthcare quality improvement projects. There is little empirical evidence on the use of process mapping in healthcare practice. This study advances understanding of the benefits and success factors of process mapping within quality improvement projects. Methods Eight quality improvement projects were purposively selected from different healthcare settings within the UK's National Health Service. Data were gathered from multiple data-sources, including interviews exploring participants' experience of using process mapping in their projects and perceptions of benefits and challenges related to its use. These were analysed using inductive analysis. Results Eight key benefits related to process mapping use were reported by participants (gathering a shared understanding of the reality; identifying improvement opportunities; engaging stakeholders in the project; defining project's objectives; monitoring project progress; learning; increased empathy; simplicity of the method) and five factors related to successful process mapping exercises (simple and appropriate visual representation, information gathered from multiple stakeholders, facilitator's experience and soft skills, basic training, iterative use of process mapping throughout the project). Conclusions Findings highlight benefits and versatility of process mapping and provide practical suggestions to improve its use in practice.

  20. Long-term performance of a hot in-place recycling project final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This report documents the construction and long-term performance of a hot in-place recycled (HIPR) : project on SR 542. HIPR project selection, mix design, construction and testing are described. It was shown that : the HIPR process successfully reha...

  1. 7 CFR 3550.55 - Applications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... notified in writing and provided with the specific reasons for the rejection. (c) Selection for processing... applicants qualifying for a veterans preference. After selection for processing, loans are funded on a first...-approved Mutual Self-Help project or loans that will leverage funding or financing from other sources. (5...

  2. 7 CFR 3550.55 - Applications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... notified in writing and provided with the specific reasons for the rejection. (c) Selection for processing... applicants qualifying for a veterans preference. After selection for processing, loans are funded on a first...-approved Mutual Self-Help project or loans that will leverage funding or financing from other sources. (5...

  3. 14 CFR § 1274.203 - Solicitations/cooperative agreement notices.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... other criteria that will be evaluated during the selection process. (c) For its research projects, NASA may publish the expected project goals and objectives in terms of “What” the commercial recipient is... to the success of the project, for some projects the recipient's statement of work may be included as...

  4. Research and Development Project Selection Tools: Probing Wright Laboratory’s Project Selection Methods and Decision Criteria Using the Lateral Airfoil Concept

    DTIC Science & Technology

    1993-09-01

    mismanagement. The broad spectrum of personality types and large sums of money, $43.3 billion in R&D for fiscal year 1993 (FY93) (Goodwin, 1992:57...projects. He used a personal and telephone interview technique to fulfill ten specific objectives. His research provides the first historical data...exploratory nature of the determinant attribute identification process suggests a personal interview format for the data collection method (Emory and Cooper

  5. Factors Influencing the Selection of the Systems Integration Organizational Model Type for Planning and Implementing Government High-Technology Programs

    NASA Technical Reports Server (NTRS)

    Thomas, Leann; Utley, Dawn

    2006-01-01

    While there has been extensive research in defining project organizational structures for traditional projects, little research exists to support high technology government project s organizational structure definition. High-Technology Government projects differ from traditional projects in that they are non-profit, span across Government-Industry organizations, typically require significant integration effort, and are strongly susceptible to a volatile external environment. Systems Integration implementation has been identified as a major contributor to both project success and failure. The literature research bridges program management organizational planning, systems integration, organizational theory, and independent project reports, in order to assess Systems Integration (SI) organizational structure selection for improving the high-technology government project s probability of success. This paper will describe the methodology used to 1) Identify and assess SI organizational structures and their success rate, and 2) Identify key factors to be used in the selection of these SI organizational structures during the acquisition strategy process.

  6. 24 CFR 1003.302 - Project specific threshold requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Project specific threshold requirements. 1003.302 Section 1003.302 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN... Purpose Grant Application and Selection Process § 1003.302 Project specific threshold requirements. (a...

  7. Project evaluation and selection using fuzzy Delphi method and zero - one goal programming

    NASA Astrophysics Data System (ADS)

    Alias, Suriana; Adna, Nofarziah; Arsad, Roslah; Soid, Siti Khuzaimah; Ali, Zaileha Md

    2014-12-01

    Project evaluation and selection is a factor affecting the impotence of board director in which is trying to maximize all the possible goals. Assessment of the problem occurred in organization plan is the first phase for decision making process. The company needs a group of expert to evaluate the problems. The Fuzzy Delphi Method (FDM) is a systematic procedure to evoke the group's opinion in order to get the best result to evaluate the project performance. This paper proposes an evaluation and selection of the best alternative project based on combination of FDM and Zero - One Goal Programming (ZOGP) formulation. ZOGP is used to solve the multi-criteria decision making for final decision part by using optimization software LINDO 6.1. An empirical example on an ongoing decision making project in Johor, Malaysia is implemented for case study.

  8. Development and implementation of a residency project advisory board.

    PubMed

    Dagam, Julie K; Iglar, Arlene; Kindsfater, Julie; Loeb, Al; Smith, Chad; Spexarth, Frank; Brierton, Dennis; Woller, Thomas

    2017-06-15

    The development and implementation of a residency project advisory board (RPAB) to manage multiple pharmacy residents' yearlong projects across several residency programs are described. Preceptor and resident feedback during our annual residency program review and strategic planning sessions suggested the implementation of a more-coordinated approach to the identification, selection, and oversight of all components of the residency project process. A panel of 7 department leaders actively engaged in residency training and performance improvement was formed to evaluate the residency project process and provide recommendations for change. These 7 individuals would eventually constitute the RPAB. The primary objective of the RPAB at Aurora Health Care is to provide oversight and a structured framework for the selection and execution of multiple residents' yearlong projects across all residency programs within our organization. Key roles of the RPAB include developing expectations, coordinating residency project ideas, and providing oversight and feedback. The development and implementation of the RPAB resulted in a significant overhaul of our entire yearlong resident project process. Trends toward success were realized after the first year of implementation, including consistent expectations, increased clarity and engagement in resident project ideas, and more projects meeting anticipated endpoints. The development and implementation of an RPAB have provided a framework to optimize the organization, progression, and outcomes of multiple pharmacy resident yearlong projects in all residency programs across our pharmacy enterprise. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  9. Idaho Transportation Department : 2010 research program peer exchange.

    DOT National Transportation Integrated Search

    2010-05-01

    The objectives of the peer exchange were to: : 1. Identify strengths, challenges, and opportunities for program and project management; : 2. Understand management expectations of the ITD Research Program; : 3. Review processes for project selection a...

  10. A decision support system for map projections of small scale data

    USGS Publications Warehouse

    Finn, Michael P.; Usery, E. Lynn; Posch, Stephan T.; Seong, Jeong Chang

    2004-01-01

    The use of commercial geographic information system software to process large raster datasets of terrain elevation, population, land cover, vegetation, soils, temperature, and rainfall requires both projection from spherical coordinates to plane coordinate systems and transformation from one plane system to another. Decision support systems deliver information resulting in knowledge that assists in policies, priorities, or processes. This paper presents an approach to handling the problems of raster dataset projection and transformation through the development of a Web-enabled decision support system to aid users of transformation processes with the selection of appropriate map projections based on data type, areal extent, location, and preservation properties.

  11. Spatial light modulator array with heat minimization and image enhancement features

    DOEpatents

    Jain, Kanti [Briarcliff Manor, NY; Sweatt, William C [Albuquerque, NM; Zemel, Marc [New Rochelle, NY

    2007-01-30

    An enhanced spatial light modulator (ESLM) array, a microelectronics patterning system and a projection display system using such an ESLM for heat-minimization and resolution enhancement during imaging, and the method for fabricating such an ESLM array. The ESLM array includes, in each individual pixel element, a small pixel mirror (reflective region) and a much larger pixel surround. Each pixel surround includes diffraction-grating regions and resolution-enhancement regions. During imaging, a selected pixel mirror reflects a selected-pixel beamlet into the capture angle of a projection lens, while the diffraction grating of the pixel surround redirects heat-producing unused radiation away from the projection lens. The resolution-enhancement regions of selected pixels provide phase shifts that increase effective modulation-transfer function in imaging. All of the non-selected pixel surrounds redirect all radiation energy away from the projection lens. All elements of the ESLM are fabricated by deposition, patterning, etching and other microelectronic process technologies.

  12. Apple Image Processing Educator

    NASA Technical Reports Server (NTRS)

    Gunther, F. J.

    1981-01-01

    A software system design is proposed and demonstrated with pilot-project software. The system permits the Apple II microcomputer to be used for personalized computer-assisted instruction in the digital image processing of LANDSAT images. The programs provide data input, menu selection, graphic and hard-copy displays, and both general and detailed instructions. The pilot-project results are considered to be successful indicators of the capabilities and limits of microcomputers for digital image processing education.

  13. AFRL Projects to Replace Cadmium

    DTIC Science & Technology

    2005-03-01

    Protocol does not – Identify/ select a material or process – Impose processing restrictions on candidates – Implement a material or process into production...within proper limits • Use XRF to measure composition and thickness – Strippability • Remove coating within 60 minutes • Replate coating and pass...product information available? Magnetron Sputtering to Replace Cd • Task 2: Coating Deposition and Screening – Selection of qualified vendors and

  14. Procurement of Architectural and Engineering Services for Sustainable Buildings: A Guide for Federal Project Managers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2004-06-01

    This guide was prepared to be a resource for federal construction project managers and others who want to integrate the principles of sustainable design into the procurement of professional building design and consulting services. To economize on energy costs and improve the safety, comfort, and health of building occupants, building design teams can incorporate daylighting, energy efficiency, renewable energy, and passive solar design into all projects in which these elements are technically and economically feasible. The information presented here will help project leaders begin the process and manage the inclusion of sustainable design in the procurement process. The section onmore » establishing selection criteria contains key elements to consider before selecting an architectural and engineering (A/E) firm. The section on preparing the statement of work discusses the broad spectrum of sustainable design services that an A/E firm can provide. Several helpful checklists are included.« less

  15. Baseline process description for simulating plutonium oxide production for precalc project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pike, J. A.

    Savannah River National Laboratory (SRNL) started a multi-year project, the PreCalc Project, to develop a computational simulation of a plutonium oxide (PuO 2) production facility with the objective to study the fundamental relationships between morphological and physicochemical properties. This report provides a detailed baseline process description to be used by SRNL personnel and collaborators to facilitate the initial design and construction of the simulation. The PreCalc Project team selected the HB-Line Plutonium Finishing Facility as the basis for a nominal baseline process since the facility is operational and significant model validation data can be obtained. The process boundary as wellmore » as process and facility design details necessary for multi-scale, multi-physics models are provided.« less

  16. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    NASA Technical Reports Server (NTRS)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation questionnaire, and a scoring formula.

  17. Climate Projections from the NARCliM Project: Bayesian Model Averaging of Maximum Temperature Projections

    NASA Astrophysics Data System (ADS)

    Olson, R.; Evans, J. P.; Fan, Y.

    2015-12-01

    NARCliM (NSW/ACT Regional Climate Modelling Project) is a regional climate project for Australia and the surrounding region. It dynamically downscales 4 General Circulation Models (GCMs) using three Regional Climate Models (RCMs) to provide climate projections for the CORDEX-AustralAsia region at 50 km resolution, and for south-east Australia at 10 km resolution. The project differs from previous work in the level of sophistication of model selection. Specifically, the selection process for GCMs included (i) conducting literature review to evaluate model performance, (ii) analysing model independence, and (iii) selecting models that span future temperature and precipitation change space. RCMs for downscaling the GCMs were chosen based on their performance for several precipitation events over South-East Australia, and on model independence.Bayesian Model Averaging (BMA) provides a statistically consistent framework for weighing the models based on their likelihood given the available observations. These weights are used to provide probability distribution functions (pdfs) for model projections. We develop a BMA framework for constructing probabilistic climate projections for spatially-averaged variables from the NARCliM project. The first step in the procedure is smoothing model output in order to exclude the influence of internal climate variability. Our statistical model for model-observations residuals is a homoskedastic iid process. Comparing RCMs with Australian Water Availability Project (AWAP) observations is used to determine model weights through Monte Carlo integration. Posterior pdfs of statistical parameters of model-data residuals are obtained using Markov Chain Monte Carlo. The uncertainty in the properties of the model-data residuals is fully accounted for when constructing the projections. We present the preliminary results of the BMA analysis for yearly maximum temperature for New South Wales state planning regions for the period 2060-2079.

  18. 77 FR 27417 - Sunshine Act Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-10

    ... Agenda II. Approval of the March 9, 2012 Meeting Minutes III. Program Planning Update and discussion of projects: Strategic Planning Process Discussion on 2013 Statutory Report Selection Process IV. Management...

  19. A Course in Polymer Processing.

    ERIC Educational Resources Information Center

    Soong, David S.

    1985-01-01

    A special-topics course in polymer processing has acquired regular course status. Course goals, content (including such new topics as polymer applications in microelectronics), and selected term projects are described. (JN)

  20. West Valley demonstration project: Alternative processes for solidifying the high-level wastes

    NASA Astrophysics Data System (ADS)

    Holton, L. K.; Larson, D. E.; Partain, W. L.; Treat, R. L.

    1981-10-01

    Two pretreatment approaches and several waste form processes for radioactive wastes were selected for evaluation. The two waste treatment approaches were the salt/sludge separation process and the combined waste process. Both terminal and interim waste form processes were studied.

  1. Design and Development of a User Interface for the Dynamic Model of Software Project Management.

    DTIC Science & Technology

    1988-03-01

    rectory of the user’s choice for future...the last choice selected. Let us assume for the sake of this tour that the user has selected all eight choices . ESTIMATED ACTUAL PROJECT SIZE DEFINITION...manipulation of varaibles in the * •. TJin~ca model "h ... ser Inter ace for the Dynamica model was designed b in iterative process of prototyping

  2. A Process Evaluation of Project Developmental Continuity. Interim Report II, Part B: Recommendations for Measuring Program Impact.

    ERIC Educational Resources Information Center

    Love, John M.; And Others

    This report presents recommendations for measures to be used in assessing the impact of Project Developmental Continuity (PDC). Chapter I reviews the purpose of the impact study and presents the basic considerations guiding the selection of measures. Chapter II describes the review process that led to the final recommendations. Chapter III…

  3. 34 CFR 606.21 - What are the selection criteria for planning grants?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... adequate. (c) Project Management. The Secretary reviews each application to determine the quality of the... which the proposed project costs are necessary and reasonable. (Approved by the Office of Management and... resources to help implement the project; and (4) The planning process is likely to achieve its intended...

  4. Content Analysis Schedule for Bilingual Education Programs: Bilingual Project Forward-Adelante.

    ERIC Educational Resources Information Center

    Figueroa, Ramon

    This content analysis schedule for the Bilingual Project of Rochester, New York presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the linguistic background…

  5. 34 CFR 606.21 - What are the selection criteria for planning grants?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... adequate. (c) Project Management. The Secretary reviews each application to determine the quality of the... which the proposed project costs are necessary and reasonable. (Approved by the Office of Management and... resources to help implement the project; and (4) The planning process is likely to achieve its intended...

  6. 34 CFR 606.21 - What are the selection criteria for planning grants?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... adequate. (c) Project Management. The Secretary reviews each application to determine the quality of the... which the proposed project costs are necessary and reasonable. (Approved by the Office of Management and... resources to help implement the project; and (4) The planning process is likely to achieve its intended...

  7. 34 CFR 606.21 - What are the selection criteria for planning grants?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... adequate. (c) Project Management. The Secretary reviews each application to determine the quality of the... which the proposed project costs are necessary and reasonable. (Approved by the Office of Management and... resources to help implement the project; and (4) The planning process is likely to achieve its intended...

  8. 34 CFR 606.21 - What are the selection criteria for planning grants?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... adequate. (c) Project Management. The Secretary reviews each application to determine the quality of the... which the proposed project costs are necessary and reasonable. (Approved by the Office of Management and... resources to help implement the project; and (4) The planning process is likely to achieve its intended...

  9. Space Processing Applications Rocket (SPAR) project SPAR 7

    NASA Technical Reports Server (NTRS)

    Poorman, R. M.

    1983-01-01

    The postflight reports of each of the Principal Investigators of three selected science payloads are presented in addition to the engineering report as documented by the Marshall Space Flight Center (MSFC). Pertinent portions of ground-based research leading to the ultimate selection of the flight sample composition are described including design, fabrication and testing. Containerless processing technology, containerless processing bubble dynamics, and comparative alloy solidification are the experiments discussed.

  10. Systems Engineering in NASA's R&TD Programs

    NASA Technical Reports Server (NTRS)

    Jones, Harry

    2005-01-01

    Systems engineering is largely the analysis and planning that support the design, development, and operation of systems. The most common application of systems engineering is in guiding systems development projects that use a phased process of requirements, specifications, design, and development. This paper investigates how systems engineering techniques should be applied in research and technology development programs for advanced space systems. These programs should include anticipatory engineering of future space flight systems and a project portfolio selection process, as well as systems engineering for multiple development projects.

  11. Version control system of CAD documents and PLC projects

    NASA Astrophysics Data System (ADS)

    Khudyakov, P. Yu; Kisel’nikov, A. Yu; Startcev, I. M.; Kovalev, A. A.

    2018-05-01

    The paper presents the process of developing a version control system for CAD documents and PLC projects. The software was tested and the optimal composition of the modules was selected. The introduction of the system has made it possible to increase the safety and stability of the process control systems, as well as to reduce the number of conflicts for versions of CAD files. The number of incidents at the enterprise related to the use of incorrect versions of PLC projects is reduced to 0.

  12. Introduction to SIMRAND: Simulation of research and development project

    NASA Technical Reports Server (NTRS)

    Miles, R. F., Jr.

    1982-01-01

    SIMRAND: SIMulation of Research ANd Development Projects is a methodology developed to aid the engineering and management decision process in the selection of the optimal set of systems or tasks to be funded on a research and development project. A project may have a set of systems or tasks under consideration for which the total cost exceeds the allocated budget. Other factors such as personnel and facilities may also enter as constraints. Thus the project's management must select, from among the complete set of systems or tasks under consideration, a partial set that satisfies all project constraints. The SIMRAND methodology uses analytical techniques and probability theory, decision analysis of management science, and computer simulation, in the selection of this optimal partial set. The SIMRAND methodology is truly a management tool. It initially specifies the information that must be generated by the engineers, thus providing information for the management direction of the engineers, and it ranks the alternatives according to the preferences of the decision makers.

  13. Special experimental project (SEP-14) alternate surfacing bidding [summary].

    DOT National Transportation Integrated Search

    2008-01-01

    The Kansas Department of Transportation (KDOT) has a pavement type selection process that includes the comparison of initial and life cycle costs for different pavement types. Those cost differences and secondary factors are considered when selecting...

  14. Guidelines for Contracting Microfilming Services.

    ERIC Educational Resources Information Center

    Byrne, Sherry

    1986-01-01

    Outlines the process involved in selecting an outside filming agent for the purpose of preserving a library's or archive's holdings. Guidelines include project planning, selecting a filming agent, and contract preparation and maintenance. A sample contract is included. (Author/EM)

  15. Development of Processing Parameters for Organic Binders Using Selective Laser Sintering

    NASA Technical Reports Server (NTRS)

    Mobasher, Amir A.

    2003-01-01

    This document describes rapid prototyping, its relation to Computer Aided Design (CAD), and the application of these techniques to choosing parameters for Selective Laser Sintering (SLS). The document reviews the parameters selected by its author for his project, the SLS machine used, and its software.

  16. Application of Metal Catalysts for High Selectivity of Glycerol Conversion to Alcohols

    DOT National Transportation Integrated Search

    2010-11-01

    The objective of this project is to determine the applicability of metal-based catalysts and optimize the process conditions for thermochemically producing primary alcohols. Metal catalysts were evaluated for their selectivities for producing alcohol...

  17. 34 CFR 607.21 - What are the selection criteria for planning grants?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management. The Secretary reviews each application to determine the quality of the plan to manage the project... implement the project; and (4) The planning process is likely to achieve its intended results. (b) Key... in the project based on the extent to which— (1) The past experience and training of key personnel...

  18. Challenges and Realities: Evaluating a School-Based Service Project.

    ERIC Educational Resources Information Center

    Keir, Scott S.; Millea, Susan

    The Hogg Foundation for Mental Health created the School of the Future (SoF) project to enable selected Texas schools to coordinate and implement school-based social and health services on their campuses and to demonstrate the effectiveness of this method of service delivery by evaluating the project to show the process used and the outcomes that…

  19. 34 CFR 607.21 - What are the selection criteria for planning grants?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Management. The Secretary reviews each application to determine the quality of the plan to manage the project... implement the project; and (4) The planning process is likely to achieve its intended results. (b) Key... in the project based on the extent to which— (1) The past experience and training of key personnel...

  20. 34 CFR 607.21 - What are the selection criteria for planning grants?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Management. The Secretary reviews each application to determine the quality of the plan to manage the project... implement the project; and (4) The planning process is likely to achieve its intended results. (b) Key... in the project based on the extent to which— (1) The past experience and training of key personnel...

  1. 34 CFR 607.21 - What are the selection criteria for planning grants?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Management. The Secretary reviews each application to determine the quality of the plan to manage the project... implement the project; and (4) The planning process is likely to achieve its intended results. (b) Key... in the project based on the extent to which— (1) The past experience and training of key personnel...

  2. 34 CFR 607.21 - What are the selection criteria for planning grants?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Management. The Secretary reviews each application to determine the quality of the plan to manage the project... implement the project; and (4) The planning process is likely to achieve its intended results. (b) Key... in the project based on the extent to which— (1) The past experience and training of key personnel...

  3. Contractor relationships and inter-organizational strategies in NASA's R and D acquisition process

    NASA Technical Reports Server (NTRS)

    Guiltinan, J.

    1976-01-01

    Interorganizational analysis of NASA's acquisition process for research and development systems is discussed. The importance of understanding the contractor environment, constraints, and motives in selecting an acquisition strategy is demonstrated. By articulating clear project goals, by utilizing information about the contractor and his needs at each stage in the acquisition process, and by thorough analysis of the inter-organizational relationship, improved selection of acquisition strategies and business practices is possible.

  4. THE DETROIT ASTHMA MORBIDITY, AIR QUALITY AND TRAFFIC (DAMAT) STUDY

    EPA Science Inventory

    The project was completed successfully. In Project Year 1, the health outcome and exposure data sets were collected, cleaned and processed, including specifically:

    • A set of daily exposure measures, based on measurements of the selected pollutants measure...

    • Space Processing Applications Rocket (SPAR) project: SPAR 10

      NASA Technical Reports Server (NTRS)

      Poorman, R. (Compiler)

      1986-01-01

      The Space Processing Applications Rocket Project (SPAR) X Final Report contains the compilation of the post-flight reports from each of the Principal Investigators (PIs) on the four selected science payloads, in addition to the engineering report as documented by the Marshall Space Flight Center (MSFC). This combined effort also describes pertinent portions of ground-based research leading to the ultimate selection of the flight sample composition, including design, fabrication and testing, all of which are expected to contribute to an improved comprehension of materials processing in space. The SPAR project was coordinated and managed by MSFC as part of the Microgravity Science and Applications (MSA) program of the Office of Space Science and Applications (OSSA) of NASA Headquarters. This technical memorandum is directed entirely to the payload manifest flown in the tenth of a series of SPAR flights conducted at the White Sands Missile Range (WSMR) and includes the experiments entitled, Containerless Processing Technology, SPAR Experiment 76-20/3; Directional Solidification of Magnetic Composites, SPAR Experiment 76-22/3; Comparative Alloy Solidification, SPAR Experiment 76-36/3; and Foam Copper, SPAR Experiment 77-9/1R.

    • Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

      NASA Astrophysics Data System (ADS)

      Bizon-Górecka, Jadwiga; Górecki, Jarosław

      2017-10-01

      The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of measures of the goals. It is crucial to identify the stakeholders, whereas it is a continuous and quite difficult process. However, when ignoring the impact of specific stakeholders on the implementation of the project, a duration of the project and its costs may increase. A main problem, in establishing a relationship of participants in the construction process, is to take into account the risk of all project stakeholders.

    • Collaborative decision-making on wind power projects based on AHP method

      NASA Astrophysics Data System (ADS)

      Badea, A.; Proştean, G.; Tămăşilă, M.; Vârtosu, A.

      2017-01-01

      The complexity of projects implementation in Renewable Energy Sources (RES) requires finding collaborative alliances between suppliers and project developers in RES. Links activities in supply chain in RES, respectively, transportation of heavy components, processing orders to purchase quality raw materials, storage and materials handling, packaging, and other complex activities requiring a logistics system collaboratively to be permanently dimensioned properly selected and monitored. Requirements imposed by stringency of wind power energy projects implementation inevitably involves constraints in infrastructure, implementation and logistics. Thus, following an extensive research in RES project, to eliminate these constraints were identified alternative collaboration to provide feasible solutions on different levels of performance. The paper presents a critical analysis of different collaboration alternatives in supply chain for RES projects, selecting the ones most suitable for particular situations by using decision-making method Analytic Hierarchy Process (AHP). The role of AHP method was to formulate a decision model by which can be establish the collaboration alternative choice through mathematical calculation to reduce the impact created by constraints encountered. The solution provided through AHP provides a framework for detecting optimal alternative collaboration between suppliers and project developers in RES and avoids some breaks in the chain by resizing safety buffers for leveling orders in RES projects.

    • Evaluation of the Montana Department of Transportation's research project solicitation, prioritization, and selection process

      DOT National Transportation Integrated Search

      2008-05-01

      The Montana Department of Transportation (MDT) contracted the Bureau of Business and Economic Research at the University of Montana Missoula to conduct research to determine how other states solicit, prioritize, and select research problem statem...

    • BIM integration in education: A case study of the construction technology project Bolt Tower Dolni Vitkovice

      NASA Astrophysics Data System (ADS)

      Venkrbec, Vaclav; Bittnerova, Lucie

      2017-12-01

      Building information modeling (BIM) can support effectiveness during many activities in the AEC industry. even when processing a construction-technological project. This paper presents an approach how to use building information model in higher education, especially during the work on diploma thesis and it supervision. Diploma thesis is project based work, which aims to compile a construction-technological project for a selected construction. The paper describes the use of input data, working with them and compares this process with standard input data such as printed design documentation. The effectiveness of using the building information model as a input data for construction-technological project is described in the conclusion.

    • Evaluating and selecting an information system, Part 1.

      PubMed

      Neal, T

      1993-01-01

      Initial steps in the process of evaluating and selecting a computerized information system for the pharmacy department are described. The first step in the selection process is to establish a steering committee and a project committee. The steering committee oversees the project, providing policy guidance, making major decisions, and allocating budgeted expenditures. The project committee conducts the departmental needs assessment, identifies system requirements, performs day-to-day functions, evaluates vendor proposals, trains personnel, and implements the system chosen. The second step is the assessment of needs in terms of personnel, workload, physical layout, and operating requirements. The needs assessment should be based on the department's mission statement and strategic plan. The third step is the development of a request for information (RFI) and a request for proposal (RFP). The RFI is a document designed for gathering preliminary information from a wide range of vendors; this general information is used in deciding whether to send the RFP to a given vendor. The RFP requests more detailed information and gives the purchaser's exact specifications for a system; the RFP also includes contractual information. To help ensure project success, many institutions turn to computer consultants for guidance. The initial steps in selecting a computerized pharmacy information system are establishing computerization committees, conducting a needs assessment, and writing an RFI and an RFP. A crucial early decision is whether to seek a consultant's expertise.

    • CONNECT Special Demonstration Project.

      ERIC Educational Resources Information Center

      Hawk, Kim; And Others

      Project CONNECT (Inmate Advocacy) was developed to provide counseling to inmates involved in the education programs at Fayette County Prison in Uniontown, Pennsylvania, before and immediately following their release. Twenty-one inmates who had been selected through a screening process received individual basic skills remediation in a classroom…

    • ANFIS multi criteria decision making for overseas construction projects: a methodology

      NASA Astrophysics Data System (ADS)

      Utama, W. P.; Chan, A. P. C.; Zulherman; Zahoor, H.; Gao, R.; Jumas, D. Y.

      2018-02-01

      A critical part when a company targeting a foreign market is how to make a better decision in connection with potential project selection. Since different attributes of information are often incomplete, imprecise and ill-defined in overseas projects selection, the process of decision making by relying on the experiences and intuition is a risky attitude. This paper aims to demonstrate a decision support method in deciding overseas construction projects (OCPs). An Adaptive Neuro-Fuzzy Inference System (ANFIS), the amalgamation of Neural Network and Fuzzy Theory, was used as decision support tool to decide to go or not go on OCPs. Root mean square error (RMSE) and coefficient of correlation (R) were employed to identify the ANFIS system indicating an optimum and efficient result. The optimum result was obtained from ANFIS network with two input membership functions, Gaussian membership function (gaussmf) and hybrid optimization method. The result shows that ANFIS may help the decision-making process for go/not go decision in OCPs.

    • A Matrix Approach to Software Process Definition

      NASA Technical Reports Server (NTRS)

      Schultz, David; Bachman, Judith; Landis, Linda; Stark, Mike; Godfrey, Sally; Morisio, Maurizio; Powers, Edward I. (Technical Monitor)

      2000-01-01

      The Software Engineering Laboratory (SEL) is currently engaged in a Methodology and Metrics program for the Information Systems Center (ISC) at Goddard Space Flight Center (GSFC). This paper addresses the Methodology portion of the program. The purpose of the Methodology effort is to assist a software team lead in selecting and tailoring a software development or maintenance process for a specific GSFC project. It is intended that this process will also be compliant with both ISO 9001 and the Software Engineering Institute's Capability Maturity Model (CMM). Under the Methodology program, we have defined four standard ISO-compliant software processes for the ISC, and three tailoring criteria that team leads can use to categorize their projects. The team lead would select a process and appropriate tailoring factors, from which a software process tailored to the specific project could be generated. Our objective in the Methodology program is to present software process information in a structured fashion, to make it easy for a team lead to characterize the type of software engineering to be performed, and to apply tailoring parameters to search for an appropriate software process description. This will enable the team lead to follow a proven, effective software process and also satisfy NASA's requirement for compliance with ISO 9001 and the anticipated requirement for CMM assessment. This work is also intended to support the deployment of sound software processes across the ISC.

    • Resource allocation in road infrastructure using ANP priorities with ZOGP formulation-A case study

      NASA Astrophysics Data System (ADS)

      Alias, Suriana; Adna, Norfarziah; Soid, Siti Khuzaimah; Kardri, Mahani

      2013-09-01

      Road Infrastructure (RI) project evaluation and selection is concern with the allocation of scarce organizational resources. In this paper, it is suggest an improved RI project selection methodology which reflects interdependencies among evaluation criteria and candidate projects. Fuzzy Delphi Method (FDM) is use to evoking expert group opinion and also to determine a degree of interdependences relationship between the alternative projects. In order to provide a systematic approach to set priorities among multi-criteria and trade-off among objectives, Analytic Network Process (ANP) is suggested to be applied prior to Zero-One Goal Programming (ZOGP) formulation. Specifically, this paper demonstrated how to combined FDM and ANP with ZOGP through a real-world RI empirical example on an ongoing decision-making project in Johor, Malaysia.

    • Simulation of generation of new ideas for new product development and IT services

      NASA Astrophysics Data System (ADS)

      Nasiopoulos, Dimitrios K.; Sakas, Damianos P.; Vlachos, D. S.; Mavrogianni, Amanda

      2015-02-01

      This paper describes a dynamic model of the New Product Development (NPD) process. The model has been occurring from best practice noticed in our research conducted at a range of situations. The model contributes to determine and put an IT company's NPD activities into the frame of the overall NPD process[1]. It has been found to be a useful tool for organizing data on IT company's NPD activities without enforcement an excessively restrictive research methodology refers to the model of NPD. The framework, which strengthens the model, will help to promote a research of the methods undertaken within an IT company's NPD process, thus promoting understanding and improvement of the simulation process[2]. IT companies tested many techniques with several different practices designed to improve the validity and efficacy of their NPD process[3]. Supported by the model, this research examines how widely accepted stated tactics are and what impact these best tactics have on NPD performance. The main assumption of this study is that simulation of generation of new ideas[4] will lead to greater NPD effectiveness and more successful products in IT companies. With the model implementation, practices concern the implementation strategies of NPD (product selection, objectives, leadership, marketing strategy and customer satisfaction) are all more widely accepted than best practices related with controlling the application of NPD (process control, measurements, results). In linking simulation with impact, our results states product success depends on developing strong products and ensuring organizational emphasis, through proper project selection. Project activities strengthens both product and project success. IT products and services success also depends on monitoring the NPD procedure through project management and ensuring team consistency with group rewards. Sharing experiences between projects can positively influence the NPD process.

    • Potential Alternatives Report for Validation of Alternative Low-Emission Surface PreparationlDepainting Technologies for Structural Steel

      NASA Technical Reports Server (NTRS)

      Lewis, Pattie

      2006-01-01

      For this project, particulates and solvents used during the depainting process of steel structures were the identified hazardous material (HazMat) targeted for elimination or reduction. This Potential Alternatives Report (PAR) provides technical analyses of identified alternatives to the current coating removal processes, criteria used to select alternatives for further analysis, and a list of those alternatives recommended for testing. The initial coating removal alternatives list was compiled using literature searches and center participant recommendations. The involved project participants initially considered fifteen (15) alternatives. In late 2004, stakeholders down-selected the list and identified specific processes as potential alternatives to the current depainting methods. The selected alternatives were: 1. Plastic Blast Media 2. Hard Abrasive Media 3. Sponge Blast Media 4. Mechanical Removal with Vacuum Attachment 5. Liquid Nitrogen 6. Laser Coating Removal Available information about these processes was used to analyze the technical merits and the potential environmental, safety, and occupational health (ESOH) impacts of these methods. A preliminary cost benefit analysis will be performed to determine if implementation of alternative technologies is economically justified. NASA AP2

    • Materials and process engineering projects for the Sandia National Laboratories/Newly Independent States Industrial Partnering Program. Volume 2

      DOE Office of Scientific and Technical Information (OSTI.GOV)

      Zanner, F.J.; Moffatt, W.C.

      1995-07-01

      In July, 1994, a team of materials specialists from Sandia and US. Industry traveled to Russia and the Ukraine to select and fund projects in materials and process technology in support of the Newly Independent States/Industrial Partnering Program (NIS/IPP). All of the projects are collaborations with scientists and Engineers at NIS Institutes. Each project is scheduled to last one year, and the deliverables are formatted to supply US. Industry with information which will enable rational decisions to be made regarding the commercial value of these technologies. This work is an unedited interim compilation of the deliverables received to date.

    • Generic project definitions for improvement of health care delivery: a case-based approach.

      PubMed

      Niemeijer, Gerard C; Does, Ronald J M M; de Mast, Jeroen; Trip, Albert; van den Heuvel, Jaap

      2011-01-01

      The purpose of this article is to create actionable knowledge, making the definition of process improvement projects in health care delivery more effective. This study is a retrospective analysis of process improvement projects in hospitals, facilitating a case-based reasoning approach to project definition. Data sources were project documentation and hospital-performance statistics of 271 Lean Six Sigma health care projects from 2002 to 2009 of general, teaching, and academic hospitals in the Netherlands and Belgium. Objectives and operational definitions of improvement projects in the sample, analyzed and structured in a uniform format and terminology. Extraction of reusable elements of earlier project definitions, presented in the form of 9 templates called generic project definitions. These templates function as exemplars for future process improvement projects, making the selection, definition, and operationalization of similar projects more efficient. Each template includes an explicated rationale, an operationalization in the form of metrics, and a prototypical example. Thus, a process of incremental and sustained learning based on case-based reasoning is facilitated. The quality of project definitions is a crucial success factor in pursuits to improve health care delivery. We offer 9 tried and tested improvement themes related to patient safety, patient satisfaction, and business-economic performance of hospitals.

    • Research notes : multimodal transportation funding, the ConnectOregon program.

      DOT National Transportation Integrated Search

      2009-08-01

      The study examined the ConnectOregon I and II project selection processes, public outreach, and the review and approval processes. Throughout the programs phases, program participants and observers have offered ideas and suggestions for improving ...

    • DOE Office of Scientific and Technical Information (OSTI.GOV)

      Curtin, D.P.

      The process analyzed involves non-production, laboratory environment use of trichloroethylene for the cleaning of semiconductor devices. The option selection centered on the replacement of the trichloroethylene with a non-hazardous material. This process waste assessment was performed as part of a pilot project.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vinick, Charles; Riccobono, Antonino, MS; Messing, Charles G., Ph.D.

    Dehlsen Associates, LLC was awarded a grant by the United States Department of Energy (DOE) Golden Field Office for a project titled 'Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy Project in Offshore Southeast Florida,' corresponding to DOE Grant Award Number DE-EE0002655 resulting from DOE funding Opportunity Announcement Number DE-FOA-0000069 for Topic Area 2, and it is referred to herein as 'the project.' The purpose of the project was to enhance the certainty of the survey requirements and regulatory review processes for the purpose of reducing the time, efforts, and costs associated with initial siting efforts ofmore » marine and hydrokinetic energy conversion facilities that may be proposed in the Atlantic Ocean offshore Southeast Florida. To secure early input from agencies, protocols were developed for collecting baseline geophysical information and benthic habitat data that can be used by project developers and regulators to make decisions early in the process of determining project location (i.e., the siting process) that avoid or minimize adverse impacts to sensitive marine benthic habitat. It is presumed that such an approach will help facilitate the licensing process for hydrokinetic and other ocean renewable energy projects within the study area and will assist in clarifying the baseline environmental data requirements described in the U.S. Department of the Interior Bureau of Ocean Energy Management, Regulation and Enforcement (formerly Minerals Management Service) final regulations on offshore renewable energy (30 Code of Federal Regulations 285, published April 29, 2009). Because projects generally seek to avoid or minimize impacts to sensitive marine habitats, it was not the intent of this project to investigate areas that did not appear suitable for the siting of ocean renewable energy projects. Rather, a two-tiered approach was designed with the first step consisting of gaining overall insight about seabed conditions offshore southeastern Florida by conducting a geophysical survey of pre-selected areas with subsequent post-processing and expert data interpretation by geophysicists and experienced marine biologists knowledgeable about the general project area. The second step sought to validate the benthic habitat types interpreted from the geophysical data by conducting benthic video and photographic field surveys of selected habitat types. The goal of this step was to determine the degree of correlation between the habitat types interpreted from the geophysical data and what actually exists on the seafloor based on the benthic video survey logs. This step included spot-checking selected habitat types rather than comprehensive evaluation of the entire area covered by the geophysical survey. It is important to note that non-invasive survey methods were used as part of this study and no devices of any kind were either temporarily or permanently attached to the seabed as part of the work conducted under this project.« less

  2. Jmol-Enhanced Biochemistry Research Projects

    ERIC Educational Resources Information Center

    Saderholm, Matthew; Reynolds, Anthony

    2011-01-01

    We developed a protein research project for a one-semester biochemistry lecture class to enhance learning and more effectively train students to understand protein structure and function. During this semester-long process, students select a protein with known structure and then research its structure, sequence, and function. This project…

  3. Learning through Collaboration.

    ERIC Educational Resources Information Center

    Fisher, Mary Henri, Ed.; And Others

    Presented are summaries of 11 selected projects in the areas of language arts, instructional media, simulation, and the valuing process developed during the 1974 summer session of the Teacher Training Institute of the Governor's School (North Carolina) by institute teachers and gifted students. Outlined are language arts projects on the history of…

  4. Reading Resources and Project LEER. Libraries and the Spanish-Speaking

    ERIC Educational Resources Information Center

    Shepard, Marietta Daniels

    1970-01-01

    A discussion of the problems U.S. librarians and educators face in dealing with Spanish-speaking children and adults; and a description of Project LEER, a program to aid school and public libraries in the selection, procurement, and processing of books in Spanish. (JB)

  5. The scientific programme between ESRO and ESA: Choosing new projects (1973-1977)

    NASA Astrophysics Data System (ADS)

    Russo, Arturo

    1995-02-01

    The ESA History Study Reports are preliminary reports of studies carried out within the framework of an ESA (European Space Agency) contract. They will form the basis of a comprehensive study of European Space activities covering the period 1959-1987. The transformation of ESRO (European Space Research Organization) into ESA found the Organization's bodies involved in a new round of the decision-making process to select future scientific satellite projects. In this report, the three main phases of the decision-making process are discussed. The first, from June 1973 to April 1974, the European scientific community and their representatives in ESA's advisory committee structure were invited to agree on a set of space missions for which a definition study was recommended. At the end of this phase, thirteen missions were selected for such a definition study by ESRO's Scientific Program Board (SPB). The second phase covers the period from that decision up to March 1975, when a much more important decision was required, namely to select a restricted number of missions for which a feasibility study was to be performed. The aims of such feasibility studies were to establish the technical and financial feasibility of each project, to propose a well-defined project concept, to identify the research and technology effort required to support it, and to state a preliminary cost estimate to completion. The third phase covers the first two years of the new Agency's life, and concludes with the selection of the projects to be adopted in ESA's scientific program.

  6. Optimal Contractor Selection in Construction Industry: The Fuzzy Way

    NASA Astrophysics Data System (ADS)

    Krishna Rao, M. V.; Kumar, V. S. S.; Rathish Kumar, P.

    2018-02-01

    A purely price-based approach to contractor selection has been identified as the root cause for many serious project delivery problems. Therefore, the capability of the contractor to execute the project should be evaluated using a multiple set of selection criteria including reputation, past performance, performance potential, financial soundness and other project specific criteria. An industry-wide questionnaire survey was conducted with the objective of identifying the important criteria for adoption in the selection process. In this work, a fuzzy set based model was developed for contractor prequalification/evaluation, by using effective criteria obtained from the percept of construction professionals, taking subjective judgments of decision makers also into consideration. A case study consisting of four alternatives (contractors in the present case) solicited from a public works department of Pondicherry in India, is used to illustrate the effectiveness of the proposed approach. The final selection of contractor is made based on the integrated score or Overall Evaluation Score of the decision alternative in prequalification as well as bid evaluation stages.

  7. The accuracy and consistency of nutrition care process terminology use in cases of refeeding syndrome.

    PubMed

    Matthews, Kylie L; Palmer, Michelle A; Capra, Sandra M

    2017-11-08

    Using standardised terminology in acute care has encouraged consistency in patient care and the evaluation of outcomes. As such, the Nutrition Care Process (NCP) and Nutrition Care Process Terminology (NCPT) may assist dietitian nutritionists in the delivery of high quality nutrition care worldwide; however, limited research has been conducted examining the consistency and accuracy of its use. We aimed to examine the NCPT that dietitian nutritionists would use to formulate a diagnostic statement relating to refeeding syndrome (RFS). A multimethod action research approach was used, incorporating two projects. The first was a survey examining Australian dietitian nutritionists' (n = 195) opinions regarding NCPT use in cases of RFS. To establish if results were similar internationally, an interview was then conducted with 22 dietitian nutritionists working within 10 different countries. 'Imbalance of nutrients' was only identified as a correct code by 17% of respondents in project 1. No mention of this term was made in project 2. Also 86% of respondents incorrectly selected more than one diagnostic code. The majority of respondents (80%, n = 52/65) who incorrectly selected 'Malnutrition', without also selecting 'Imbalance of nutrients', selected 'reduce intake' as an intervention, suggesting some misunderstanding in the requirement for interrelated diagnoses, interventions and goals. Our findings demonstrate that there is limited accuracy and consistency in selecting nutritional diagnostic codes in relation to RFS. Respondents also demonstrated limited knowledge regarding appropriate application of the NCP and NCPT. Implementation practices may require further refinement, as accurate and consistent use is required to procure the benefits of standardised terminology. © 2017 Dietitians Association of Australia.

  8. Process waste assessment: Petroleum jelly removal from semiconductor die using trichloroethylene

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Curtin, D.P.

    The process analyzed involves non-production, laboratory environment use of trichloroethylene for the cleaning of semiconductor devices. The option selection centered on the replacement of the trichloroethylene with a non-hazardous material. This process waste assessment was performed as part of a pilot project.

  9. Selection, Development and Results for The RESOLVE Regolith Volatiles Characterization Analytical System

    NASA Technical Reports Server (NTRS)

    Lueck, Dale E.; Captain, Janine E.; Gibson, Tracy L.; Peterson, Barbara V.; Berger, Cristina M.; Levine, Lanfang

    2008-01-01

    The RESOLVE project requires an analytical system to identify and quantitate the volatiles released from a lunar drill core sample as it is crushed and heated to 150 C. The expected gases and their range of concentrations were used to assess Gas Chromatography (GC) and Mass Spectrometry (MS), along with specific analyzers for use on this potential lunar lander. The ability of these systems to accurately quantitate water and hydrogen in an unknown matrix led to the selection of a small MEMS commercial process GC for use in this project. The modification, development and testing of this instrument for the specific needs of the project is covered.

  10. Design Course for Micropower Generation Devices

    ERIC Educational Resources Information Center

    Mitsos, Alexander

    2009-01-01

    A project-based design course is developed for man-portable power generation via microfabricated fuel cell systems. Targeted audience are undergraduate chemical/process engineering students in their final year. The course covers 6 weeks, with three hours of lectures per week. Two alternative projects are developed, one focusing on selection of…

  11. A Foresight Process as an Institutional Sensemaking Tool

    ERIC Educational Resources Information Center

    Vuori, Johanna

    2015-01-01

    Purpose: The purpose of this paper is to examine how a foresight project supports institutional positioning efforts through joint sensemaking. Design/methodology/approach: This paper describes a case study that investigated the design, implementation, and outcomes of a foresight project at a Finnish higher education institution that selected sales…

  12. 77 FR 11677 - Medicaid Program; Review and Approval Process for Section 1115 Demonstrations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... experimental, pilot, and demonstration projects approved under section 1115 of the Social Security Act relating... selected provisions of section 1902 of the Act for experimental, pilot, or demonstration projects... application, and recommended that CMS allow the State to not post a complete application. The commenters noted...

  13. Satellite Television Demonstration Project.

    ERIC Educational Resources Information Center

    Alaska Governor's Office of Telecommunications, Juneau.

    This report describes the status of this pilot satellite television project for the state of Alaska which provides for the distribution of television programming to the RCA Toll Centers in Anchorage, Fairbanks, Juneau, Sitka, and Bethel, as well as to 23 selected rural sites. The historical background is discussed, as well as the process involved…

  14. A novel heterogeneous training sample selection method on space-time adaptive processing

    NASA Astrophysics Data System (ADS)

    Wang, Qiang; Zhang, Yongshun; Guo, Yiduo

    2018-04-01

    The performance of ground target detection about space-time adaptive processing (STAP) decreases when non-homogeneity of clutter power is caused because of training samples contaminated by target-like signals. In order to solve this problem, a novel nonhomogeneous training sample selection method based on sample similarity is proposed, which converts the training sample selection into a convex optimization problem. Firstly, the existing deficiencies on the sample selection using generalized inner product (GIP) are analyzed. Secondly, the similarities of different training samples are obtained by calculating mean-hausdorff distance so as to reject the contaminated training samples. Thirdly, cell under test (CUT) and the residual training samples are projected into the orthogonal subspace of the target in the CUT, and mean-hausdorff distances between the projected CUT and training samples are calculated. Fourthly, the distances are sorted in order of value and the training samples which have the bigger value are selective preference to realize the reduced-dimension. Finally, simulation results with Mountain-Top data verify the effectiveness of the proposed method.

  15. Implementation of Building Information Modeling (BIM) in Construction: A Comparative Case Study

    NASA Astrophysics Data System (ADS)

    Rowlinson, Steve; Collins, Ronan; Tuuli, Martin M.; Jia, Yunyan

    2010-05-01

    Building Information Modeling (BIM) approach is increasingly adopted in coordination of construction projects, with a number of parties providing BIM services and software solutions. However, the empirical impact of BIM on construction industry has yet to be investigated. This paper explores the interaction between BIM and the construction industry during its implementation, with a specific focus on the empirical impacts of BIM on the design and construction processes and professional roles during the process. Two cases were selected from recent construction projects coordinated with BIM systems: the Venetian Casino project in Macau and the Cathy Pacific Cargo Terminal project in Hong Kong. The former case illustrates how the conflicts emerged during the design process and procurement were addressed by adopting a BIM approach. The latter demonstrates how the adoption of BIM altered the roles of architect, contractor, and sub-contractors involved in the project. The impacts of BIM were critically reviewed and discussed.

  16. 49 CFR 80.17 - Fees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... under the TIFIA. The DOT may also require an additional credit processing fee for projects selected to receive TIFIA assistance. Any required application initiation or credit processing fee must be paid by the... any credit processing fees for FY 2000. For each application and approval cycle in FY 2001 and beyond...

  17. Computers in Public Schools: Changing the Image with Image Processing.

    ERIC Educational Resources Information Center

    Raphael, Jacqueline; Greenberg, Richard

    1995-01-01

    The kinds of educational technologies selected can make the difference between uninspired, rote computer use and challenging learning experiences. University of Arizona's Image Processing for Teaching Project has worked with over 1,000 teachers to develop image-processing techniques that provide students with exciting, open-ended opportunities for…

  18. Technology Requirements and Selection for Securely Partitioning OBSW

    NASA Astrophysics Data System (ADS)

    Mendham, Peter; Windsor, James; Eckstein, Knut

    2010-08-01

    The Securely Partitioning Spacecraft Computing Resources project is a current ESA TRP activity investigating the application of secure time and space partitioning (TSP) technologies to enable multi-use missions from a single platform. Secure TSP technologies are used in a number of application areas outside the space domain and an opportunity exists to 'spin-in' a suitable solution. The selection of a technology for use within space the European space industry relies on an understanding of the requirements for the application of secure TSP, of which this paper presents a summary. Further, the paper outlines the selection process taken by the project and highlights promising solutions for use today.

  19. Evaluation of Roadway Reallocation Projects: Analysis of Before-and-After Travel Speeds and Congestion Utilizing High-Resolution Bus Transit Data

    DOT National Transportation Integrated Search

    2017-11-01

    The traditional process of identifying corridors for road diet improvements involves selecting potential corridors (mostly based on identifying fourlane roads) and conducting a traffic impact analysis of proposed changes on a selected roadway before ...

  20. Evaluation and selection of decision-making methods to assess landfill mining projects.

    PubMed

    Hermann, Robert; Baumgartner, Rupert J; Vorbach, Stefan; Ragossnig, Arne; Pomberger, Roland

    2015-09-01

    For the first time in Austria, fundamental technological and economic studies on recovering secondary raw materials from large landfills have been carried out, based on the 'LAMIS - Landfill Mining Austria' pilot project. A main focus of the research - and the subject of this article - was to develop an assessment or decision-making procedure that allows landfill owners to thoroughly examine the feasibility of a landfill mining project in advance. Currently there are no standard procedures that would sufficiently cover all the multiple-criteria requirements. The basic structure of the multiple attribute decision making process was used to narrow down on selection, conceptual design and assessment of suitable procedures. Along with a breakdown into preliminary and main assessment, the entire foundation required was created, such as definitions of requirements to an assessment method, selection and accurate description of the various assessment criteria and classification of the target system for the present 'landfill mining' vs. 'retaining the landfill in after-care' decision-making problem. Based on these studies, cost-utility analysis and the analytical-hierarchy process were selected from the range of multiple attribute decision-making procedures and examined in detail. Overall, both methods have their pros and cons with regard to their use for assessing landfill mining projects. Merging these methods or connecting them with single-criteria decision-making methods (like the net present value method) may turn out to be reasonable and constitute an appropriate assessment method. © The Author(s) 2015.

  1. A Path to Successful Energy Retrofits: Early Collaboration through Integrated Project Delivery Teams

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parrish, Kristen

    2012-10-01

    This document guides you through a process for the early design phases of retrofit projects to help you mitigate frustrations commonly experienced by building owners and designers. It outlines the value of forming an integrated project delivery team and developing a communication and information-sharing infrastructure that fosters collaboration. This guide does not present a complete process for designing an energy retrofit for a building. Instead, it focuses on the early design phase tasks related to developing and selecting energy efficiency measures (EEMs) that benefit from collaboration, and highlights the resulting advantages.

  2. Stakeholders and public involvement in river management: heterogeneous acceptance of participatory processes among Swiss institutions.

    NASA Astrophysics Data System (ADS)

    Buletti, Nora; Utz, Stephan; Ejderyan, Olivier; Graefe, Olivier; Lane, Stuart; Reynard, Emmanuel

    2014-05-01

    This research explores participatory processes in the domain of river management in Switzerland. The main objective is to better understand how participatory processes are incorporated into river management practice. Switzerland being a federal state, river management is a cantonal (regional) responsibility, under the supervision (and co-funding) of the State (a Confederation). The federal funding includes the opportunity to fund additional participatory activities to aid river management, not least because the federal authorities consider the involvement of wider stakeholders and the public in decision-making as a means of aiding the progression of projects. This is a particularly important goal in a Swiss setting where direct democracy (the possibility of calling the decision of any level of government into question through a popular vote) means that a reasonable level of project acceptance is a necessary element of project progression. River management in Switzerland now includes both flood protection and river restoration objectives, which has served to increase its controversy: river corridors contain competing interests with different objectives (e.g. ecological enhancement, protection of agricultural land, flood risk reduction). We were asked by the Confederation to evaluate participatory processes it sponsored and one element of this evaluation aimed to develop a typology of stakeholder participation. We conducted interviews with the 26 cantonal officers in charge of river management. These interviews were based upon thematically structured open ended questions, with the responses analyzed qualitatively. We have identified significant divergence in the implementation of participatory processes between the cantons. These appear to be related to two factors: (1) the canton's historical experience of river management; and (2) the methods used to select stakeholders for inclusion in the decisional process. Cantons that refer to guidelines or pre-established handbooks for the selection of stakeholders often conduct instrumental participation, limited to information dissemination. On the other hand, in some cantons participatory processes characterized by normative rationales take place. Here the goals of participatory processes are not limited to outcomes (e.g. acceptance of the project), but value the process of participation in itself. In these cantons actors are selected via social connections and the claimed 'common sense' of cantonal project officers. Here, the opportunity of public debate opens up, the inclusion of actors often start earlier in the decision-making processes and objectives are defined publicly and collectively. Cantonal authorities involved in river management do not all consider participatory processes as important. The acknowledgment of participatory processes is less related to an authority's recognition of the importance of participation and more to specific local experience.

  3. The prioritization of mobility improvements using a multicriteria prioritization algorithm : final report

    DOT National Transportation Integrated Search

    1998-07-01

    A prioritization process has been prepared by the University of California, Davis, for use by the Oregon Department of Transportation (ODOT) in selecting multimodal mobility improvement projects to fund, given a budget constraint. The process involve...

  4. An Overview of the James Webb Space Telescope (JWST) Project

    NASA Technical Reports Server (NTRS)

    Sabelhaus, Phillip A.

    2004-01-01

    The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is now fully in place with the recent selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.

  5. An Overview of the James Webb Space Telescope (JWST) Project

    NASA Technical Reports Server (NTRS)

    Sabelhaus, Phillip A.; Campbell, Doug; Clampin, Mark; Decker, John; Greenhouse, Matt; Johns, Alan; Menzel, Mike; Smith, Robert; Sullivan, Pam

    2005-01-01

    The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is now fully in place with the selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.

  6. Postoptimality Analysis in the Selection of Technology Portfolios

    NASA Technical Reports Server (NTRS)

    Adumitroaie, Virgil; Shelton, Kacie; Elfes, Alberto; Weisbin, Charles R.

    2006-01-01

    This slide presentation reviews a process of postoptimally analysing the selection of technology portfolios. The rationale for the analysis stems from the need for consistent, transparent and auditable decision making processes and tools. The methodology is used to assure that project investments are selected through an optimization of net mission value. The main intent of the analysis is to gauge the degree of confidence in the optimal solution and to provide the decision maker with an array of viable selection alternatives which take into account input uncertainties and possibly satisfy non-technical constraints. A few examples of the analysis are reviewed. The goal of the postoptimality study is to enhance and improve the decision-making process by providing additional qualifications and substitutes to the optimal solution.

  7. From scenarios to domain models: processes and representations

    NASA Astrophysics Data System (ADS)

    Haddock, Gail; Harbison, Karan

    1994-03-01

    The domain specific software architectures (DSSA) community has defined a philosophy for the development of complex systems. This philosophy improves productivity and efficiency by increasing the user's role in the definition of requirements, increasing the systems engineer's role in the reuse of components, and decreasing the software engineer's role to the development of new components and component modifications only. The scenario-based engineering process (SEP), the first instantiation of the DSSA philosophy, has been adopted by the next generation controller project. It is also the chosen methodology of the trauma care information management system project, and the surrogate semi-autonomous vehicle project. SEP uses scenarios from the user to create domain models and define the system's requirements. Domain knowledge is obtained from a variety of sources including experts, documents, and videos. This knowledge is analyzed using three techniques: scenario analysis, task analysis, and object-oriented analysis. Scenario analysis results in formal representations of selected scenarios. Task analysis of the scenario representations results in descriptions of tasks necessary for object-oriented analysis and also subtasks necessary for functional system analysis. Object-oriented analysis of task descriptions produces domain models and system requirements. This paper examines the representations that support the DSSA philosophy, including reference requirements, reference architectures, and domain models. The processes used to create and use the representations are explained through use of the scenario-based engineering process. Selected examples are taken from the next generation controller project.

  8. Quantifying, Visualizing, and Monitoring Lead Optimization.

    PubMed

    Maynard, Andrew T; Roberts, Christopher D

    2016-05-12

    Although lead optimization (LO) is by definition a process, process-centric analysis and visualization of this important phase of pharmaceutical R&D has been lacking. Here we describe a simple statistical framework to quantify and visualize the progression of LO projects so that the vital signs of LO convergence can be monitored. We refer to the resulting visualizations generated by our methodology as the "LO telemetry" of a project. These visualizations can be automated to provide objective, holistic, and instantaneous analysis and communication of LO progression. This enhances the ability of project teams to more effectively drive LO process, while enabling management to better coordinate and prioritize LO projects. We present the telemetry of five LO projects comprising different biological targets and different project outcomes, including clinical compound selection, termination due to preclinical safety/tox, and termination due to lack of tractability. We demonstrate that LO progression is accurately captured by the telemetry. We also present metrics to quantify LO efficiency and tractability.

  9. Simulation Games: Practical References, Potential Use, Selected Bibliography.

    ERIC Educational Resources Information Center

    Kidder, Steven J.

    Several recently published books on simulation and games are briefly discussed. Selected research studies and demonstration projects are examined to show the potential of simulation and gaming for teaching and training and for the study of social and psychological processes. The bibliography lists 113 publications which should lead the reader to…

  10. Outsourcing Cataloging, Authority Work, and Physical Processing: A Checklist of Considerations.

    ERIC Educational Resources Information Center

    Kascus, Marie A., Ed.; Hale, Dawn, Ed.

    Due to automation technology, financial restrictions, and resultant downsizing, library managers have increasingly relied on the services of contractors, rather than in-house staff, to accomplish different technical services operations. Contracted services may range from a small project for a selected group of materials to a large project for…

  11. Lessons learned in deploying software estimation technology and tools

    NASA Technical Reports Server (NTRS)

    Panlilio-Yap, Nikki; Ho, Danny

    1994-01-01

    Developing a software product involves estimating various project parameters. This is typically done in the planning stages of the project when there is much uncertainty and very little information. Coming up with accurate estimates of effort, cost, schedule, and reliability is a critical problem faced by all software project managers. The use of estimation models and commercially available tools in conjunction with the best bottom-up estimates of software-development experts enhances the ability of a product development group to derive reasonable estimates of important project parameters. This paper describes the experience of the IBM Software Solutions (SWS) Toronto Laboratory in selecting software estimation models and tools and deploying their use to the laboratory's product development groups. It introduces the SLIM and COSTAR products, the software estimation tools selected for deployment to the product areas, and discusses the rationale for their selection. The paper also describes the mechanisms used for technology injection and tool deployment, and concludes with a discussion of important lessons learned in the technology and tool insertion process.

  12. Negotiating a Systems Development Method

    NASA Astrophysics Data System (ADS)

    Karlsson, Fredrik; Hedström, Karin

    Systems development methods (or methods) are often applied in tailored version to fit the actual situation. Method tailoring is in most the existing literature viewed as either (a) a highly rational process with the method engineer as the driver where the project members are passive information providers or (b) an unstructured process where the systems developer makes individual choices, a selection process without any driver. The purpose of this chapter is to illustrate that important design decisions during method tailoring are made by project members through negotiation. The study has been carried out using the perspective of actor-network theory. Our narratives depict method tailoring as more complex than (a) and (b) show the driver role rotates between the project members, and design decisions are based on influences from several project members. However, these design decisions are not consensus decisions.

  13. INcreasing Security and Protection through Infrastructure REsilience: The INSPIRE Project

    NASA Astrophysics Data System (ADS)

    D'Antonio, Salvatore; Romano, Luigi; Khelil, Abdelmajid; Suri, Neeraj

    The INSPIRE project aims at enhancing the European potential in the field of security by ensuring the protection of critical information infrastructures through (a) the identification of their vulnerabilities and (b) the development of innovative techniques for securing networked process control systems. To increase the resilience of such systems INSPIRE will develop traffic engineering algorithms, diagnostic processes and self-reconfigurable architectures along with recovery techniques. Hence, the core idea of the INSPIRE project is to protect critical information infrastructures by appropriately configuring, managing, and securing the communication network which interconnects the distributed control systems. A working prototype will be implemented as a final demonstrator of selected scenarios. Controls/Communication Experts will support project partners in the validation and demonstration activities. INSPIRE will also contribute to standardization process in order to foster multi-operator interoperability and coordinated strategies for securing lifeline systems.

  14. Mars Atmospheric Capture and Gas Separation

    NASA Technical Reports Server (NTRS)

    Muscatello, Anthony; Santiago-Maldonado, Edgardo; Gibson, Tracy; Devor, Robert; Captain, James

    2011-01-01

    The Mars atmospheric capture and gas separation project is selecting, developing, and demonstrating techniques to capture and purify Martian atmospheric gases for their utilization for the production of hydrocarbons, oxygen, and water in ISRU systems. Trace gases will be required to be separated from Martian atmospheric gases to provide pure C02 to processing elements. In addition, other Martian gases, such as nitrogen and argon, occur in concentrations high enough to be useful as buffer gas and should be captured as welL To achieve these goals, highly efficient gas separation processes will be required. These gas separation techniques are also required across various areas within the ISRU project to support various consumable production processes. The development of innovative gas separation techniques will evaluate the current state-of-the-art for the gas separation required, with the objective to demonstrate and develop light-weight, low-power methods for gas separation. Gas separation requirements include, but are not limited to the selective separation of: (1) methane and water from un-reacted carbon oxides (C02- CO) and hydrogen typical of a Sabatier-type process, (2) carbon oxides and water from unreacted hydrogen from a Reverse Water-Gas Shift process, (3) carbon oxides from oxygen from a trash/waste processing reaction, and (4) helium from hydrogen or oxygen from a propellant scavenging process. Potential technologies for the separations include freezers, selective membranes, selective solvents, polymeric sorbents, zeolites, and new technologies. This paper and presentation will summarize the results of an extensive literature review and laboratory evaluations of candidate technologies for the capture and separation of C02 and other relevant gases.

  15. Total energy food plant 21 million gallon ethanol facility

    NASA Astrophysics Data System (ADS)

    1981-10-01

    The Phase I Engineering study includes the following: process description, waste water treatment plant, material summary, energy chart, capital cost estimate, equipment list, personnel requirements, drawings list, specifications list, and project schedule. The economic and financial feasibility of the technical process, and environmental, health, safety, and socio-economic assessments for the project are reported. The costs for extending the following utilities to the property line of the selected site are presented: potable water, sewer system, electricity, roads for truck traffic, and rail service.

  16. Mass Transit: Implementation of FTA’s New Starts Evaluation Process and FY 2001 Funding Proposals

    DTIC Science & Technology

    2000-04-01

    formalize the process. FTA issued a proposed rule on April 7, 1999, and plans to issue final regulations by the summer of 2000. In selecting projects for...commit funds to any more New Starts projects during the last 2 years of TEA-21—through fiscal year 2003. Because there are plans for many more...regional review of alternatives, develop preliminary engineering plans , and meet FTA’s approval for the final design. TEA-21 requires that FTA evaluate

  17. Gas Hydrate Research Site Selection and Operational Research Plans

    NASA Astrophysics Data System (ADS)

    Collett, T. S.; Boswell, R. M.

    2009-12-01

    In recent years it has become generally accepted that gas hydrates represent a potential important future energy resource, a significant drilling and production hazard, a potential contributor to global climate change, and a controlling factor in seafloor stability and landslides. Research drilling and coring programs carried out by the Ocean Drilling Program (ODP), the Integrated Ocean Drilling Program (IODP), government agencies, and several consortia have contributed greatly to our understanding of the geologic controls on the occurrence of gas hydrates in marine and permafrost environments. For the most part, each of these field projects were built on the lessons learned from the projects that have gone before them. One of the most important factors contributing to the success of some of the more notable gas hydrate field projects has been the close alignment of project goals with the processes used to select the drill sites and to develop the project’s operational research plans. For example, IODP Expedition 311 used a transect approach to successfully constrain the overall occurrence of gas hydrate within the range of geologic environments within a marine accretionary complex. Earlier gas hydrate research drilling, including IODP Leg 164, were designed primarily to assess the occurrence and nature of marine gas hydrate systems, and relied largely on the presence of anomalous seismic features, including bottom-simulating reflectors and “blanking zones”. While these projects were extremely successful, expeditions today are being increasingly mounted with the primary goal of prospecting for potential gas hydrate production targets, and site selection processes designed to specifically seek out anomalously high-concentrations of gas hydrate are needed. This approach was best demonstrated in a recently completed energy resource focused project, the Gulf of Mexico Gas Hydrate Joint Industry Project Leg II (GOM JIP Leg II), which featured the collection of a comprehensive set of logging-while-drilling (LWD) data through expected gas-hydrate-bearing sand reservoirs in seven wells at three sites in the Gulf of Mexico. The discovery of thick hydrate-bearing sands at two of the sites drilled in the Gulf Mexico validated the integrated geological and geophysical approach used in the pre-drill site selection process to identify gas hydrate reservoirs that may be conducive to energy production. The results of the GOM JIP Leg II LWD expedition are also being used to support the selection of sites for a future drilling, logging, and coring program. Operationally, recent drilling programs, such as ODP Leg 204, IODP Expedition 311, the Japanese Toaki-oki to Kumano-nada drilling leg, the Indian NGHP Expedition 01, and the South Korean Gas Hydrate Research and Development Organization Expedition 01 have demonstrated the great benefit of a multi-leg drilling approach, including the initial acquisition of LWD data that was used to then select sites for the drilling of complex core and wireline logging test holes. It is obvious that a fully integrated site selection approach and a “goal based” operational plan, possibly including numerous drill sites and drilling legs, are required considerations for any future gas hydrate research project.

  18. Using a fuzzy DEMATEL method for analyzing the factors influencing subcontractors selection

    NASA Astrophysics Data System (ADS)

    Kozik, Renata

    2016-06-01

    Subcontracting is a long-standing practice in the construction industry. This form of project organization, if manage properly, could provide the better quality, reduction in project time and costs. Subcontractors selection is a multi-criterion problem and can be determined by many factors. Identifying the importance of each of them as well as the direction of cause-effect relations between various types of factors can improve the management process. Their values could be evaluated on the basis of the available expert opinions with the application of a fuzzy multi-stage grading scale. In this paper it is recommended to use fuzzy DEMATEL method to analyze the relationship between factors affecting subcontractors selection.

  19. Decision analysis and drug development portfolio management: uncovering the real options value of your projects.

    PubMed

    Rosati, Nicoletta

    2002-04-01

    Project selection and portfolio management are particularly challenging in the pharmaceutical industry due to the high risk - high stake nature of the drug development process. In the recent years, scholars and industry experts have agreed that traditional Net-Present-Value evaluation of the projects fails to capture the value of managerial flexibility, and encouraged adopting a real options approach to recover the missed value. In this paper, we take a closer look at the drug development process and at the indices currently used to rank projects. We discuss the economic value of information and of real options arising in drug development and present decision analysis as an ideal framework for the implementation of real options valuation.

  20. Arsenic/Radium Removal from Drinking Water by the HMO Process, U.S. EPA Demonstration Project at Greenville, WI

    EPA Science Inventory

    In 2003, the Town of Greenville, Wisconsin was selected for the Round 2 U.S. Environmental Protection Agency (EPA) Arsenic Demonstration Program and a Kinetico Macrolite® pressure filtration system was selected for its ability to remove arsenic. Well reconstruction prior to the ...

  1. Selection of Technical Communication Concepts for Integration into an Accounting Information Systems Course: A WAC Case Study.

    ERIC Educational Resources Information Center

    Gelinas, Ulric J., Jr.; Rama, D. V.; Skelton, Terrance M.

    1997-01-01

    Profiles a writing-across-the-curriculum project in an accountancy program. Notes that the team's collaborative process produced three critical planning decisions: (1) establishing "fitness-for-use" for evaluating student communications; (2) selecting only those forms of communication used in accountancy; and (3) teaching only those…

  2. Students' Research Experiences during Consulting Projects: Three Themes Emerging from Case Studies

    ERIC Educational Resources Information Center

    Phillips, Carissa M. Holler

    2010-01-01

    Student consulting projects, an advanced form of problem-based learning, allow students to apply the skills developed in their classes on behalf of client organizations. A review of selected case studies in business education and other management education literature shows that research is an integral part of this consulting process. More than…

  3. The Maury Project 2011 Annual Report

    DTIC Science & Technology

    2011-09-30

    inservice teacher enhancement courses, which have trained thousands of other teachers. IMPACT/APPLICATIONS Maury Project summer workshop participants...of pre-college teachers on the physical foundations of oceanography. This is accomplished through a peer- training process of training the trainers...objectives: (a) Master teachers will be trained to be peer trainers and resource persons on the physical foundations of selected oceanographic

  4. 34 CFR 350.62 - What are the matching requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements? (a)(1) The Secretary may make grants to pay for part of the costs of research and demonstration... projects. (2) Each grantee must participate in the costs of those projects. (3) The specific amount of cost... considered in the selection process. (b)(1) The Secretary may make grants to pay for part or all of the costs...

  5. 23 CFR Appendix A to Part 450 - Linking the Transportation Planning and NEPA Processes

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... and refined, and how the design concept and scope were determined) should play a critical role in...., congestion, pavement, bridge, and/or safety) may shape the purpose and need statement. The use of these..., selection of the design concept and scope for a project or series of projects. Subsequently, second-tier...

  6. 23 CFR Appendix A to Part 450 - Linking the Transportation Planning and NEPA Processes

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... and refined, and how the design concept and scope were determined) should play a critical role in...., congestion, pavement, bridge, and/or safety) may shape the purpose and need statement. The use of these..., selection of the design concept and scope for a project or series of projects. Subsequently, second-tier...

  7. 23 CFR Appendix A to Part 450 - Linking the Transportation Planning and NEPA Processes

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... and refined, and how the design concept and scope were determined) should play a critical role in...., congestion, pavement, bridge, and/or safety) may shape the purpose and need statement. The use of these..., selection of the design concept and scope for a project or series of projects. Subsequently, second-tier...

  8. 23 CFR Appendix A to Part 450 - Linking the Transportation Planning and NEPA Processes

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and refined, and how the design concept and scope were determined) should play a critical role in...., congestion, pavement, bridge, and/or safety) may shape the purpose and need statement. The use of these..., selection of the design concept and scope for a project or series of projects. Subsequently, second-tier...

  9. 23 CFR Appendix A to Part 450 - Linking the Transportation Planning and NEPA Processes

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... and refined, and how the design concept and scope were determined) should play a critical role in...., congestion, pavement, bridge, and/or safety) may shape the purpose and need statement. The use of these..., selection of the design concept and scope for a project or series of projects. Subsequently, second-tier...

  10. [Nebraska 4-H Wheat Science School Enrichment Project, Teacher/Leader Guides 213-222 and 227.

    ERIC Educational Resources Information Center

    Nebraska Univ., Lincoln. Inst. of Agriculture and Natural Resources.

    Through the 4-H Wheat Science project, students learn the importance of wheat from the complete process of growing wheat to the final product of bread. The curriculum is designed to include hands-on experiences in science, consumer education, nutrition, production economics, vocabulary, and applied mathematics. Teachers can select those units out…

  11. NASA EEE Parts and Advanced Interconnect Program (AIP)

    NASA Technical Reports Server (NTRS)

    Gindorf, T.; Garrison, A.

    1996-01-01

    none given From Program Objectives: I. Accelerate the readiness of new technologies through development of validation, assessment and test method/tools II. Provide NASA Projects infusion paths for emerging technologies III. Provide NASA Projects technology selection, application and validation guidelines for harware and processes IV. Disseminate quality assurance, reliability, validation, tools and availability information to the NASA community.

  12. Maximizing mitigation benefits : project summary.

    DOT National Transportation Integrated Search

    2016-04-30

    The research team: : - Reviewed methods, techniques, and : processes at select state DOTs for estimating : mitigations costs for the following states: : Arizona, California, Colorado, Florida, New : York, North Carolina, Ohio, Oregon, : Pennsylvania,...

  13. ODOT research news : spring 2006.

    DOT National Transportation Integrated Search

    2006-01-01

    The research newsletter includes: : 1) Northwest Transportation Conference; : 2) Research Opportunities In The SAFETEA-LU Transportation Reauthorization Bill; : 3) 2007 Project Selection Process; : 4) Testing Cracked Cross-beams; : 5) An Enhancement ...

  14. Macroergonomic study of food sector company distribution centres.

    PubMed

    García Acosta, Gabriel; Lange Morales, Karen

    2008-07-01

    This study focussed on the work system design to be used by a Colombian food sector company for distributing products. It considered the concept of participative ergonomics, where people from the commercial, logistics, operation, occupational health areas worked in conjunction with the industrial designers, ergonomists who methodologically led the project. As a whole, the project was conceived as having five phases: outline, diagnosis, modelling the process, scalability, instrumentation. The results of the project translate into procedures for selecting, projecting a new distribution centre, the operational process model, a description of ergonomic systems that will enable specific work stations to be designed, the procedure for adapting existing warehouses. Strategically, this work helped optimise the company's processes and ensure that knowledge would be transferred within it. In turn, it became a primary prevention strategy in the field of health, aimed at reducing occupational risks, improving the quality of life at work.

  15. Report on all ARRA Funded Technical Work

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2013-10-05

    The main focus of this American Recovery and Reinvestment Act of 2009 (ARRA) funded project was to design an energy efficient carbon capture and storage (CCS) process using the Recipients membrane system for H{sub 2} separation and CO{sub 2} capture. In the ARRA-funded project, the Recipient accelerated development and scale-up of ongoing hydrogen membrane technology research and development (R&D). Specifically, this project focused on accelerating the current R&D work scope of the base program-funded project, involving lab scale tests, detail design of a 250 lb/day H{sub 2} process development unit (PDU), and scale-up of membrane tube and coating manufacturing. Thismore » project scope included the site selection and a Front End Engineering Design (FEED) study of a nominally 4 to 10 ton-per-day (TPD) Pre-Commercial Module (PCM) hydrogen separation membrane system. Process models and techno-economic analysis were updated to include studies on integration of this technology into an Integrated Gasification Combined Cycle (IGCC) power generation system with CCS.« less

  16. Evaluation of Mars CO2 Capture and Gas Separation Technologies

    NASA Technical Reports Server (NTRS)

    Muscatello, Anthony C.; Santiago-Maldonado, Edgardo; Gibson, Tracy; Devor, Robert; Captain, James

    2011-01-01

    Recent national policy statements have established that the ultimate destination of NASA's human exploration program is Mars. In Situ Resource Utilization (ISRU) is a key technology required to ,enable such missions and it is appropriate to review progress in this area and continue to advance the systems required to produce rocket propellant, oxygen, and other consumables on Mars using the carbon dioxide atmosphere and other potential resources. The Mars Atmospheric Capture and Gas separation project is selecting, developing, and demonstrating techniques to capture and purify Martian atmospheric gases for their utilization for the production of hydrocarbons, oxygen, and water in ISRU systems. Trace gases will be required to be separated from Martian atmospheric gases to provide pure CO2 to processing elements. In addition, other Martian gases, such as nitrogen and argon, occur in concentrations high enough to be useful as buffer gas and should be captured as well. To achieve these goals, highly efficient gas separation processes will be required. These gas separation techniques are also required across various areas within the ISRU project to support various consumable production processes. The development of innovative gas separation techniques will evaluate the current state-of-the-art for the gas separation required, with the objective to demonstrate and develop light-weight, low-power methods for gas separation. Gas separation requirements include, but are not limited to the selective separation of: (1) methane and water from unreacted carbon oxides (C02-CO) and hydrogen typical of a Sabatier-type process, (2) carbon oxides and water from unreacted hydrogen from a Reverse Water-Gas Shift process, (3)/carbon oxides from oxygen from a trash/waste processing reaction, and (4) helium from hydrogen or oxygen from a propellant scavenging process. Potential technologies for the separations include' freezers, selective membranes, selective solvents, polymeric sorbents, zeolites, and new technologies. This paper summarizes the results of an extensive literature review of candidate technologies for the capture and separation of CO2 and other relevant gases. This information will be used to prioritize the technologies to be developed further during this and other ISRU projects.

  17. Risk-Informed Decision Making: Application to Technology Development Alternative Selection

    NASA Technical Reports Server (NTRS)

    Dezfuli, Homayoon; Maggio, Gaspare; Everett, Christopher

    2010-01-01

    NASA NPR 8000.4A, Agency Risk Management Procedural Requirements, defines risk management in terms of two complementary processes: Risk-informed Decision Making (RIDM) and Continuous Risk Management (CRM). The RIDM process is used to inform decision making by emphasizing proper use of risk analysis to make decisions that impact all mission execution domains (e.g., safety, technical, cost, and schedule) for program/projects and mission support organizations. The RIDM process supports the selection of an alternative prior to program commitment. The CRM process is used to manage risk associated with the implementation of the selected alternative. The two processes work together to foster proactive risk management at NASA. The Office of Safety and Mission Assurance at NASA Headquarters has developed a technical handbook to provide guidance for implementing the RIDM process in the context of NASA risk management and systems engineering. This paper summarizes the key concepts and procedures of the RIDM process as presented in the handbook, and also illustrates how the RIDM process can be applied to the selection of technology investments as NASA's new technology development programs are initiated.

  18. Application of BIM technology in construction bidding

    NASA Astrophysics Data System (ADS)

    wei, Li

    2017-12-01

    bidding is a very important step of construction project. For the owners, bidding is the key link of selecting the best construction plan and saving the project cost to the maximum extent. For Construction Corporation, it is the key to show their construction technology which can improve the probability of winning the bid. this paper researches on the application of BIM technology in bidding process of construction project in detail, and discussesthe application of BIM technology in construction field comprehensively.

  19. DARPA Technical Accomplishments. An Historical Review of Selected DARPA Projects. Volume 1

    DTIC Science & Technology

    1990-02-01

    CARBON - CARBON METAL MATRIX C4OMPOSITES CERAMIC TURBINE BLADES RAPID SCUJDIFICATION VLSI PROCESSING GaAs IN•TEGRATED CIRCUITS INFORMATION PROCESSING...500 S. The lee of Gough Island was also used to avoid Iage ships’ motions in the heavy seas. The two other locations were selected to separate the...lower curve) trajectories of Pioneer IlL. The labels on the contours are counts per second of a heavy shielded miniature Geiger-Mueller tube. The linear

  20. 78 FR 5268 - Allocation of Capacity on New Merchant Transmission Projects and New Cost-Based, Participant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... solicitation, selection and negotiation process criteria set forth herein. The Commission is making these... negotiation process criteria set forth herein. The Commission is making these clarifications and refinements... requesting clarification noted in the discussion of specific elements of this final policy statement. \\16...

  1. Project prioritization and selection process : economic vitality.

    DOT National Transportation Integrated Search

    2010-05-19

    This measure will attempt to gauge how improvements in the regions transportation network reduce constraints on commerce and industry, improve productivity and labor market access, and expand opportunity for new business.

  2. Merging home and health via contemporary care delivery: program management insights on a home telehealth project.

    PubMed

    Abraham, Chon; Rosenthal, David A

    2008-01-01

    This article discusses a home telehealth program that uses innovative informatics and telemedicine technologies to meet the needs of a Veterans Affairs Medical Center. We provide background information for the program inclusive of descriptions for the decision support system, patient selection process, and selected home telehealth technologies. Lessons learned based on interview data collected from the project team highlight issues regarding implementation and management of the program. Our goal is to provide useful information to other healthcare systems considering home telehealth as a contemporary option for care delivery.

  3. Design of a Vehicle Based Intervention System to Prevent Ozone Loss

    NASA Technical Reports Server (NTRS)

    Cole, Robin; Fisher, Daniel; Meade, Matt; Neel, James; Olson, Kristin; Pittman, Andrew; Valdivia, Anne; Wibisono, Aria; Mason, William H.; Kirschbaum, Nathan

    1995-01-01

    This project was designed to be completed over a period of three years. Overall project goals were: (1) To understand the processes that contribute to stratospheric ozone loss; (2) To determine the best prevention scheme for loss; (3) To design a delivery vehicle to accomplish the prevention scheme. The 1994-1995 design objectives included: (1) To review the results of the 1993-1994 design team, including a reevaluation of the major assumptions and criteria selected to choose a vehicle; (2) To evaluate preliminary vehicle concepts and perform quantitative trade studies to select the optimal vehicle concept.

  4. 78 FR 71645 - Pilot Project for Tribal Jurisdiction over Crimes of Domestic Violence

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... women have non-Indian husbands.\\5\\ \\4\\ See S. Rep. No. 112-153, at 3, 7-11, 32 (2012) (citing studies... person's right to due process. In the case of ex parte orders, notice and opportunity to be heard must be... jury selection and indigent defense. On September 13, 2013, the Center for Jury Studies, a project of...

  5. LBNL Laboratory Directed Research and Development Program FY2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ho, D.

    2017-03-01

    The Berkeley Lab Laboratory Directed Research and Development Program FY2016 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the supported projects and summarizes their accomplishments. It constitutes a part of the LDRD program planning and documentation process that includes an annual planning cycle, project selection, implementation and review.

  6. "Module 9": A New Course to Help Students Develop Interdisciplinary Projects Using the Framework of Experiential Learning Theory

    ERIC Educational Resources Information Center

    Canboy, Basak; Montalvo, Adolfo; Buganza, M. Carmen; Emmerling, Robert J.

    2016-01-01

    This paper offers an example of how to introduce student-centred knowledge creation and competency development in a systematic way into a master's programme. The curriculum of a new course called Module 9 was framed according to experiential learning theory. While student teams work on self-selected projects, their learning processes are…

  7. Identifying challenges in project consultants engagement practices

    NASA Astrophysics Data System (ADS)

    Shariffuddin, Nadia Alina Amir; Abidin, Nazirah Zainul

    2017-10-01

    Construction projects, green or conventional, involve multi-faceted disciplines engaged with the goal of delivering products i.e. building, infrastructure etc. at the best quality within stipulated budgets. For green projects, additional attention is added for environmental quality. Due to the various responsibilities and liabilities involved as well as the complexity of the construction process itself, formal engagement of multi-disciplinary professionals i.e. project consultants is required in any construction project. Poor selection of project consultants will lead to a multitude of complications resulting in delay, cost escalation, conflicts and poor quality. This paper explores the challenges that occur during the engagement of project consultants in a green project. As the engagement decision involves developers and architects, these two groups of respondents with green project backgrounds were approached qualitatively using interview technique. The challenges identified are limited experience and knowledge, consultants' fee vs. quality, green complexity, conflicts of interest, clients' extended expectation and less demand in green projects. The construction shifts to green project demands engagement of project consultants with added skills. It is expected that through the identification of challenges, better management and administration can be created which would give impact to the overall process of engagement in green projects.

  8. Photovoltaic module encapsulation design and materials selection, volume 1

    NASA Technical Reports Server (NTRS)

    Cuddihy, E.; Carroll, W.; Coulbert, C.; Gupta, A.; Liang, R. H.

    1982-01-01

    Encapsulation material system requirements, material selection criteria, and the status and properties of encapsulation materials and processes available are presented. Technical and economic goals established for photovoltaic modules and encapsulation systems and their status are described. Available encapsulation technology and data are presented to facilitate design and material selection for silicon flat plate photovoltaic modules, using the best materials available and processes optimized for specific power applications and geographic sites. The operational and environmental loads that encapsulation system functional requirements and candidate design concepts and materials that are identified to have the best potential to meet the cost and performance goals for the flat plate solar array project are described. Available data on encapsulant material properties, fabrication processing, and module life and durability characteristics are presented.

  9. Cadmium Alternatives for High-Strength Steel JTP. Phase 2

    DTIC Science & Technology

    2007-01-24

    Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 U.S. AIR FORCE Project Overview Objective Assess DoD- selected cadmium alternatives in...focused) – Phase III (fatigue testing focused) • Down- selection of candidates for further testing after each phase of testing is complete (Phases I...Laboratories – Mr. John Marshall U.S. AIR FORCE Phase I Overview and Selection Process – Traditional plating (primary coatings): • Sputtered Aluminum

  10. Integration of Occupational Safety to Contractors` or Subcontractors` Performance Evaluation in Construction Projects

    NASA Astrophysics Data System (ADS)

    Kozlovská, Mária; Struková, Zuzana

    2013-06-01

    Several factors should be considered by the owner and general contractor in the process of contractors` and subcontractors` selection and evaluation. The paper reviews the recent models addressed to guide general contractors in subcontractors' selection process and in evaluation of different contractors during the execution of the project. Moreover the paper suggests the impact of different contractors' performance to the overall level of occupational health and safety culture at the sites. It deals with the factors influencing the safety performance of contractors during construction and analyses the methods for assessing the safety performance of construction contractors. The results of contractors' safety performance evaluation could be a useful tool in motivating contractors to achieve better safety outcomes or could have effect on owners` or general contractors' decision making about contractors suitability for future contracting works.

  11. Maximizing biomass production in semi-arid regions: genotypic selection of identified species. [Saltbush and Johnson Grass

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goodin, J.R.; Newton, R.J.

    1983-08-31

    This project identifies genotypes selected from two species of unconventional plants previously identified as having exceptional potential for the production of biomass feedstock in semi-arid regions. The project involved collection of germ plasm from indigenous Atriplex canescens (saltbush) and introduced Sorghum halepense (Johnson grass). In addition, greenhouse and field screening techniques recently aplied to domesticated crop plants are used to identify exceptional biomass productivity based on drought tolerance, salinity tolerance, and seedling vigor. In both of these species, the genetic base is enormous. Saltbush is common to all of western North America, and Johnsongrass had established itself as an importantmore » forage and weedy species throughout most of the world. It would appear that artificial selection for desirable genotypes is a feasible process, and this project has demonstrated the possibility of selection from many accessions from the field. Preliminary screening for seedling vigor, drought tolerance, and salt tolerance has produced a few genotypes now ready for field testing. Propagation of these cloned genotypes is underway. 22 references, 2 figures, 1 table.« less

  12. Practice and professional development plans (PPDPs): results of a feasibility study.

    PubMed

    Elwyn, G; Carlisle, S; Hocking, P; Smail, S

    2001-01-01

    Dissatisfaction with uniprofessional education structures as a means of improving the quality of healthcare has led to proposals to develop ways of integrating professional learning and organisational development. Test the feasibility of introducing practice and professional development plans using a centrally sponsored project in Wales. Qualitative observational study. All 541 practices in Wales were alerted to the project and invited to apply. A selection process was suggested to Health Authorities but not always efficiently conducted: 23 practices were selected and 18 participated in the process. Central funding was made available to health authorities. The project framework was designed by an educational department and conceptualised as the development of personal portfolios linked to one key organisation change in each practice, facilitated by external consultants who would typically hold workshops or other events. An independent researcher using non-participant observation techniques at workshops and practices undertook documentary analysis and fieldwork in four health authorities. Difficulties were encountered with the process of implementing the project: marketing and practice selection inconsistencies delayed the work and it was difficult to recruit practices into the project. The lack of experienced individuals to do the work and practitioner suspicion about perceived 'management' agendas were significant problems. After initial hesitancies most practices appreciated the value of developing wider ownership and commitment to proposed practice changes. Organisations found it difficult to support individual completion of the personal portfolio component of the plans. The ability to develop systems for clinical services was dependent on having already established a culture of effective teamwork in the organisation. This work supports the view that organisational development has considerable potential for bringing about effective change, and individual contributions could form a valuable component of personal portfolios. We believe that the existing structures in education and management in the health service are not yet able to support these processes. Evidence from the fields of risk management and quality improvement all point to the need to develop effective organisational systems and the results of this feasibility study indicate that alternative models of sustaining organisational development need careful evaluation.

  13. Practice and professional development plans (PPDPs): results of a feasibility study

    PubMed Central

    Elwyn, Glyn; Carlisle, Sandra; Hocking, Paul; Smail, Simon

    2001-01-01

    Background Dissatisfaction with uniprofessional education structures as a means of improving the quality of healthcare has led to proposals to develop ways of integrating professional learning and organisational development. Aims Test the feasibility of introducing practice and professional development plans using a centrally sponsored project in Wales. Design Qualitative observational study. Study sample All 541 practices in Wales were alerted to the project and invited to apply. A selection process was suggested to Health Authorities but not always efficiently conducted: 23 practices were selected and 18 participated in the process. Method Central funding was made available to health authorities. The project framework was designed by an educational department and conceptualised as the development of personal portfolios linked to one key organisation change in each practice, facilitated by external consultants who would typically hold workshops or other events. An independent researcher using non-participant observation techniques at workshops and practices undertook documentary analysis and fieldwork in four health authorities. Results Difficulties were encountered with the process of implementing the project: marketing and practice selection inconsistencies delayed the work and it was difficult to recruit practices into the project. The lack of experienced individuals to do the work and practitioner suspicion about perceived 'management' agendas were significant problems. After initial hesitancies most practices appreciated the value of developing wider ownership and commitment to proposed practice changes. Organisations found it difficult to support individual completion of the personal portfolio component of the plans. The ability to develop systems for clinical services was dependent on having already established a culture of effective teamwork in the organisation. Conclusions This work supports the view that organisational development has considerable potential for bringing about effective change, and individual contributions could form a valuable component of personal portfolios. We believe that the existing structures in education and management in the health service are not yet able to support these processes. Evidence from the fields of risk management and quality improvement all point to the need to develop effective organisational systems and the results of this feasibility study indicate that alternative models of sustaining organisational development need careful evaluation. PMID:11299046

  14. The path to an experiment in space (from concept to flight)

    NASA Technical Reports Server (NTRS)

    Salzman, Jack A.

    1994-01-01

    The following are discussed in this viewgraph presentation on developing flight experiments for NASA's Microgravity Science and Applications Program: time from flight PI selection to launch; key flight experiment phases and schedule drivers; microgravity experiment definition/development process; definition and engineering development phase; ground-based reduced gravity research facilities; project organization; responsibilities and duties of principle investigator/co-investigators, project scientist, and project manager; the science requirements document; flight development phase; experiment cost and schedule; and keys to experiment success.

  15. Changes of flood risk on the northern foothills of the Tatra Mountains

    NASA Astrophysics Data System (ADS)

    Kundzewicz, Z. W.; Stoffel, M.; Wyżga, B.; Ruiz-Villanueva, V.; Niedźwiedź, T.; Kaczka, R.; Ballesteros-Cánovas, J. A.; Pińskwar, I.; Łupikasza, E.; Zawiejska, J.; Mikuś, P.; Choryński, A.; Hajdukiewicz, H.; Spyt, B.; Janecka, K.

    2017-08-01

    The present paper reviews selected outcomes of the FLORIST project devoted to flood risk in the region of the northern foothills of the Tatra Mountains in Poland and summarizes novel results. The project encompassed theoretical, field, and modeling work. It was focused around observation-based hydroclimatology; projections for the future; dendrogeomorphology; as well as influence of transport of large wood on fluvial processes. The project improved understanding and interpreting changes in high-flow frequency and magnitude as well as changes in flood risk in the region, related to the presence of large wood in mountain streams. A unique database on past episodes of intense precipitation and flooding was created, harnessing multiple sources. The project showed that the analysis of tree rings and wood logs can offer useful information, complementing and considerably enriching the knowledge of river floods in the region of northern foothills of the Tatra Mountains. Retrospective and scenario-defined modeling of selected past fluvial events in the region was also performed.

  16. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    NASA Technical Reports Server (NTRS)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  17. Advanced Manufacturing for Thermal and Environmental Control Systems: Achieving National Energy Goals

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bogucz, Edward A.

    This project was part of a regional initiative in the five counties of Central New York (CNY) that received funding from the U.S. Department of Energy (DOE) and four other federal agencies through the 2012 Advanced Manufacturing Jobs and Innovation Accelerator Challenge (AMJIAC). The CNY initiative was focused on cultivating the emergent regional cluster in “Advanced Manufacturing for Thermal and Environmental Control (AM-TEC).” As one component of the CNY AM-TEC initiative, the DOE-funded project supported five research & development seed projects that strategically targeted: 1) needs and opportunities of CNY AM-TEC companies, and 2) the goal of DOE’s Advanced Manufacturingmore » Office (AMO) to reduce energy consumption by 50% across product life-cycles over 10 years. The project also sought to fulfill the AMO mission of developing and demonstrating new, energy-efficient processing and materials technologies at a scale adequate to prove their value to manufacturers and spur investment. The five seed projects demonstrated technologies and processes that can reduce energy intensity and improve production as well as use less energy throughout their lifecycles. The project was conducted over three years in two 18-month budget periods. During the first budget period, two projects proposed in the original AMJAIC application were successfully completed: Seed Project 1 focused on saving energy in heat transfer processes via development of nano structured surfaces to significantly increase heat flux; Seed Project 2 addressed saving energy in data centers via subzero cooling of the computing processors. Also during the first budget period, a process was developed and executed to select a second round of seed projects via a competitive request for proposals from regional companies and university collaborators. Applicants were encouraged to form industry-academic partnerships to leverage experience and resources of public and private sectors in the CNY region. Proposals were evaluated by a national panel of experts. Three projects were selected for awards and were completed successfully during the second budget period: Seed Project 3 focused on enabling self-powered furnaces to permit residents to shelter in place during power outages; Seed Project 4 addressed development of a novel method of controlling air conditioning systems that could enable flexible load matching in market segments not possible with existing technologies; and Seed Project 5 focused on the creation of smarter occupancy sensors to enable effective highly localized demand based ventilation.« less

  18. Low cost solar array project production process and equipment task. A Module Experimental Process System Development Unit (MEPSDU)

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Technical readiness for the production of photovoltaic modules using single crystal silicon dendritic web sheet material is demonstrated by: (1) selection, design and implementation of solar cell and photovoltaic module process sequence in a Module Experimental Process System Development Unit; (2) demonstration runs; (3) passing of acceptance and qualification tests; and (4) achievement of a cost effective module.

  19. Investigation of Springback Associated with Composite Material Component Fabrication (MSFC Center Director's Discretionary Fund Final Report, Project 94-09)

    NASA Technical Reports Server (NTRS)

    Benzie, M. A.

    1998-01-01

    The objective of this research project was to examine processing and design parameters in the fabrication of composite components to obtain a better understanding and attempt to minimize springback associated with composite materials. To accomplish this, both processing and design parameters were included in a Taguchi-designed experiment. Composite angled panels were fabricated, by hand layup techniques, and the fabricated panels were inspected for springback effects. This experiment yielded several significant results. The confirmation experiment validated the reproducibility of the factorial effects, error recognized, and experiment as reliable. The material used in the design of tooling needs to be a major consideration when fabricating composite components, as expected. The factors dealing with resin flow, however, raise several potentially serious material and design questions. These questions must be dealt with up front in order to minimize springback: viscosity of the resin, vacuum bagging of the part for cure, and the curing method selected. These factors directly affect design, material selection, and processing methods.

  20. Geocoding uncertainty analysis for the automated processing of Sentinel-1 data using Sentinel-1 Toolbox software

    NASA Astrophysics Data System (ADS)

    Dostálová, Alena; Naeimi, Vahid; Wagner, Wolfgang; Elefante, Stefano; Cao, Senmao; Persson, Henrik

    2016-10-01

    One of the major advantages of the Sentinel-1 data is its capability to provide very high spatio-temporal coverage allowing the mapping of large areas as well as creation of dense time-series of the Sentinel-1 acquisitions. The SGRT software developed at TU Wien aims at automated processing of Sentinel-1 data for global and regional products. The first step of the processing consists of the Sentinel-1 data geocoding with the help of S1TBX software and their resampling to a common grid. These resampled images serve as an input for the product derivation. Thus, it is very important to select the most reliable processing settings and assess the geocoding uncertainty for both backscatter and projected local incidence angle images. Within this study, selection of Sentinel-1 acquisitions over 3 test areas in Europe were processed manually in the S1TBX software, testing multiple software versions, processing settings and digital elevation models (DEM) and the accuracy of the resulting geocoded images were assessed. Secondly, all available Sentinel-1 data over the areas were processed using selected settings and detailed quality check was performed. Overall, strong influence of the used DEM on the geocoding quality was confirmed with differences up to 80 meters in areas with higher terrain variations. In flat areas, the geocoding accuracy of backscatter images was overall good, with observed shifts between 0 and 30m. Larger systematic shifts were identified in case of projected local incidence angle images. These results encourage the automated processing of large volumes of Sentinel-1 data.

  1. Technology transfer to a developing nation, Korea

    NASA Technical Reports Server (NTRS)

    Stone, C. A.; Uccetta, S. J.

    1973-01-01

    An experimental project is reported which was undertaken. to determine if selected types of technology developed for the aerospace program during the past decade are relevant to specific industrial problems of a developing nation and to test whether a structured program could facilitate the transfer of relevant technologies. The Korea Institute of Science and Technology and the IIT Research Institute were selected as the active transfer agents to participate in the program. The pilot project was based upon the approach to the transfer of domestic technology developed by the NASA Technology Utilization Division and utilized the extensive data and technical resources available through the Space Agency and its contractors. This pilot project has helped to clarify some aspects of the international technology transfer process and to upgrade Korean technological capabilities.

  2. Application of Digital Technologies in the Geography Teaching Process from the Teachers' Perspective

    ERIC Educational Resources Information Center

    Karolcík, Štefan; Cipková, Elena; Mázorová, Henrieta

    2016-01-01

    This survey focused on the analysis of opinions and attitudes expressed by Geography teachers participating in the national project called "Modernization of the Educational Process in Elementary and Secondary School", in selected training centres in Slovakia during 2008-2013. The main objective of the course was innovation and…

  3. When Privilege Meets Poverty: Using Poetry in the Process of Reflection

    ERIC Educational Resources Information Center

    Clark, Ann-Marie

    2009-01-01

    This article describes the use of poetry as a pedagogical tool intended to intensify the reflective process of a service-learning project. In addition to keeping electronic journal entries, and summarizing and reflecting on service activities, preservice teachers wrote (or selected) poems to reconstruct their experiences and recreate some of the…

  4. Scientific Data Purchase Project Overview Presentation

    NASA Technical Reports Server (NTRS)

    Holekamp, Kara; Fletcher, Rose

    2001-01-01

    The Scientific Data Purchase (SDP) project acquires science data from commercial sources. It is a demonstration project to test a new way of doing business, tap new sources of data, support Earth science research, and support the commercial remote sensing industry. Phase I of the project reviews simulated/prototypical data sets from 10 companies. Phase II of the project is a 3 year purchase/distribution of select data from 5 companies. The status of several SDP projects is reviewed in this viewgraph presentation, as is the SDP process of tasking, verification, validation, and data archiving. The presentation also lists SDP results for turnaround time, metrics, customers, data use, science research, applications research, and user feedback.

  5. Risk Balance: A Key Tool for Mission Operations Assurance

    NASA Technical Reports Server (NTRS)

    Bryant, Larry W.; Faris, Grant B.

    2011-01-01

    The Mission Operations Assurance (MOA) discipline actively participates as a project member to achieve their common objective of full mission success while also providing an independent risk assessment to the Project Manager and Office of Safety and Mission Success staff. The cornerstone element of MOA is the independent assessment of the risks the project faces in executing its mission. Especially as the project approaches critical mission events, it becomes imperative to clearly identify and assess the risks the project faces. Quite often there are competing options for the project to select from in deciding how to execute the event. An example includes choices between proven but aging hardware components and unused but unproven components. Timing of the event with respect to visual or telecommunications visibility can be a consideration in the case of Earth reentry or hazardous maneuver events. It is in such situations that MOA is called upon for a risk balance assessment or risk trade study to support their recommendation to the Project Manager for a specific option to select. In the following paragraphs we consider two such assessments, one for the Stardust capsule Earth return and the other for the choice of telecommunications system configuration for the EPOXI flyby of the comet Hartley 2. We discuss the development of the trade space for each project's scenario and characterize the risks of each possible option. The risk characterization we consider includes a determination of the severity or consequence of each risk if realized and the likelihood of its occurrence. We then examine the assessment process to arrive at a MOA recommendation. Finally we review each flight project's decision process and the outcome of their decisions.

  6. Internet Navigation and Information Search Strategies: How Do Children Are Influenced by Their Participation in an Intensive ICT Project

    ERIC Educational Resources Information Center

    Badilla Quintana, Maria; Cortada Pujol, Meritxell; Riera Romani, Jordi

    2012-01-01

    The aim of this study was to describe and analyze the involvement showed by 190 students who participated in an introduction to Information and Communication Technologies (ICT) project, in public schools from Spain. By means of an Internet browsing test, access and information selection processes were afforded. The purpose of the study was to…

  7. Post-Occupancy Evaluation (POE) Methodologies for School Facilities: A Case Study of the V. Sue Cleveland High School Post Occupancy Evaluation

    ERIC Educational Resources Information Center

    Harmon, Marcel; Larroque, Andre; Maniktala, Nate

    2012-01-01

    The New Mexico Public School Facilities Authority (NMPSFA) is the agency responsible for administering state-funded capital projects for schools statewide. Post occupancy evaluation (POE) is the tool selected by NMPSFA for measuring project outcomes. The basic POE process for V. Sue Cleveland High School (VSCHS) consisted of a series of field…

  8. Improving the Textbook Selection Process: Case Studies of the Textbook Adoption Guidelines Project. Technical Report No. 478.

    ERIC Educational Resources Information Center

    Dole, Janice; And Others

    A study followed three textbook adoption committees as they evaluated basal reading programs. The committees used "A Guide to Selecting Basal Reading Programs" (developed at the Center for the Study of Reading) to help them evaluate the quality of instruction in existing programs. Case studies of the three committees sought to address the…

  9. Predicting the Impacts of Climate Change on Runoff and Sediment Processes in Agricultural Watersheds: A Case Study from the Sunflower Watershed in the Lower Mississippi Basin

    NASA Astrophysics Data System (ADS)

    Elkadiri, R.; Momm, H.; Yasarer, L.; Armour, G. L.

    2017-12-01

    Climatic conditions play a major role in physical processes impacting soil and agrochemicals detachment and transportation from/in agricultural watersheds. In addition, these climatic conditions are projected to significantly vary spatially and temporally in the 21st century, leading to vast uncertainties about the future of sediment and non-point source pollution transport in agricultural watersheds. In this study, we selected the sunflower basin in the lower Mississippi River basin, USA to contribute in the understanding of how climate change affects watershed processes and the transport of pollutant loads. The climate projections used in this study were retrieved from the archive of World Climate Research Programme's (WCRP) Coupled Model Intercomparison Phase 5 (CMIP5) project. The CMIP5 dataset was selected because it contains the most up-to-date spatially downscaled and bias corrected climate projections. A subset of ten GCMs representing a range in projected climate were spatially downscaled for the sunflower watershed. Statistics derived from downscaled GCM output representing the 2011-2040, 2041-2070 and 2071-2100 time periods were used to generate maximum/minimum temperature and precipitation on a daily time step using the USDA Synthetic Weather Generator, SYNTOR. These downscaled climate data were then utilized as inputs to run in the Annualized Agricultural Non-Point Source (AnnAGNPS) pollution watershed model to estimate time series of runoff, sediment, and nutrient loads produced from the watershed. For baseline conditions a validated simulation of the watershed was created and validated using historical data from 2000 until 2015.

  10. Using a modified intervention mapping approach to develop and refine a single-session motivational intervention for methamphetamine-using men who have sex with men.

    PubMed

    Zule, William A; Coomes, Curtis M; Karg, Rhonda; Harris, Jennie L; Orr, Alex; Wechsberg, Wendee M

    2010-05-14

    There is an ongoing need for the development and adaptation of behavioral interventions to address behaviors related to acquisition and transmission of infectious diseases and for preventing the onset of chronic diseases. This paper describes the application of an established systematic approach to the development of a behavioral intervention to reduce sexual risk behaviors for HIV among men who have sex with men and who use methamphetamine. The approach includes six steps: (1) a needs assessment; (2) preparing matrices of proximal program objectives; (3) selecting theory-based methods and practical strategies; (4) producing program components and materials; (5) planning for program adoption, implementation, and sustainability; and (6) planning for evaluation. The focus of this article is on the intervention development process; therefore the article does not describe steps 5 and 6. Overall the process worked well, although it had to be adapted to fit the sequence of events associated with a funded research project. This project demonstrates that systematic approaches to intervention development can be applied even in research projects where some of the steps occur during the proposal writing process rather than during the actual project. However, intervention developers must remain flexible and be prepared to adapt the process to the situation. This includes being ready to make choices regarding intervention efficacy versus feasibility and being willing to select the best intervention that is likely to be delivered with available resources rather than an ideal intervention that may not be practical.

  11. Breakthrough Propulsion Physics Project: Project Management Methods

    NASA Technical Reports Server (NTRS)

    Millis, Marc G.

    2004-01-01

    To leap past the limitations of existing propulsion, the NASA Breakthrough Propulsion Physics (BPP) Project seeks further advancements in physics from which new propulsion methods can eventually be derived. Three visionary breakthroughs are sought: (1) propulsion that requires no propellant, (2) propulsion that circumvents existing speed limits, and (3) breakthrough methods of energy production to power such devices. Because these propulsion goals are presumably far from fruition, a special emphasis is to identify credible research that will make measurable progress toward these goals in the near-term. The management techniques to address this challenge are presented, with a special emphasis on the process used to review, prioritize, and select research tasks. This selection process includes these key features: (a) research tasks are constrained to only address the immediate unknowns, curious effects or critical issues, (b) reliability of assertions is more important than the implications of the assertions, which includes the practice where the reviewers judge credibility rather than feasibility, and (c) total scores are obtained by multiplying the criteria scores rather than by adding. Lessons learned and revisions planned are discussed.

  12. Novel polymer membrane process for pre-combustion CO{sub 2} capture from coal-fired syngas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Merkel, Tim

    2011-09-14

    This final report describes work conducted for the Department of Energy (DOE NETL) on development of a novel polymer membrane process for pre-combustion CO{sub 2} capture from coalfired syngas (award number DE-FE0001124). The work was conducted by Membrane Technology and Research, Inc. (MTR) from September 15, 2009, through December 14, 2011. Tetramer Technologies, LLC (Tetramer) was our subcontract partner on this project. The National Carbon Capture Center (NCCC) at Wilsonville, AL, provided access to syngas gasifier test facilities. The main objective of this project was to develop a cost-effective membrane process that could be used in the relatively near-term tomore » capture CO{sub 2} from shifted syngas generated by a coal-fired Integrated Gasification Combined Cycle (IGCC) power plant. In this project, novel polymeric membranes (designated as Proteus™ membranes) with separation properties superior to conventional polymeric membranes were developed. Hydrogen permeance of up to 800 gpu and H{sub 2}/CO{sub 2} selectivity of >12 was achieved using a simulated syngas mixture at 150°C and 50 psig, which exceeds the original project targets of 200 gpu for hydrogen permeance and 10 for H{sub 2}/CO{sub 2} selectivity. Lab-scale Proteus membrane modules (with a membrane area of 0.13 m{sup 2}) were also developed using scaled-up Proteus membranes and high temperature stable module components identified during this project. A mixed-gas hydrogen permeance of about 160 gpu and H{sub 2}/CO{sub 2} selectivity of >12 was achieved using a simulated syngas mixture at 150°C and 100 psig. We believe that a significant improvement in the membrane and module performance is likely with additional development work. Both Proteus membranes and lab-scale Proteus membrane modules were further evaluated using coal-derived syngas streams at the National Carbon Capture Center (NCCC). The results indicate that all module components, including the Proteus membrane, were stable under the field conditions (feed pressures: 150-175 psig and feed temperatures: 120-135°C) for over 600 hours. The field performance of both Proteus membrane stamps and Proteus membrane modules is consistent with the results obtained in the lab, suggesting that the presence of sulfur-containing compounds (up to 780 ppm hydrogen sulfide), saturated water vapor, carbon monoxide and heavy hydrocarbons in the syngas feed stream has no adverse effect on the Proteus membrane or module performance. We also performed an economic analysis for a number of membrane process designs developed in this project (using hydrogen-selective membranes, alone or in the combination with CO{sub 2}- selective membranes). The current field performance for Proteus membranes was used in the design analysis. The study showed the current best design has the potential to reduce the increase in Levelized Cost of Electricity (LCOE) caused by 90% CO{sub 2} capture to about 15% if co-sequestration of H{sub 2}S is viable. This value is still higher than the DOE target for increase in LCOE (10%); however, compared to the base-case Selexol process that gives a 30% increase in LCOE at 90% CO2 capture, the membrane-based process appears promising. We believe future improvements in membrane performance have the potential to reach the DOE target.« less

  13. The Adverse Drug Reactions from Patient Reports in Social Media Project: Five Major Challenges to Overcome to Operationalize Analysis and Efficiently Support Pharmacovigilance Process

    PubMed Central

    Dahamna, Badisse; Guillemin-Lanne, Sylvie; Darmoni, Stefan J; Faviez, Carole; Huot, Charles; Katsahian, Sandrine; Leroux, Vincent; Pereira, Suzanne; Richard, Christophe; Schück, Stéphane; Souvignet, Julien; Lillo-Le Louët, Agnès; Texier, Nathalie

    2017-01-01

    Background Adverse drug reactions (ADRs) are an important cause of morbidity and mortality. Classical Pharmacovigilance process is limited by underreporting which justifies the current interest in new knowledge sources such as social media. The Adverse Drug Reactions from Patient Reports in Social Media (ADR-PRISM) project aims to extract ADRs reported by patients in these media. We identified 5 major challenges to overcome to operationalize the analysis of patient posts: (1) variable quality of information on social media, (2) guarantee of data privacy, (3) response to pharmacovigilance expert expectations, (4) identification of relevant information within Web pages, and (5) robust and evolutive architecture. Objective This article aims to describe the current state of advancement of the ADR-PRISM project by focusing on the solutions we have chosen to address these 5 major challenges. Methods In this article, we propose methods and describe the advancement of this project on several aspects: (1) a quality driven approach for selecting relevant social media for the extraction of knowledge on potential ADRs, (2) an assessment of ethical issues and French regulation for the analysis of data on social media, (3) an analysis of pharmacovigilance expert requirements when reviewing patient posts on the Internet, (4) an extraction method based on natural language processing, pattern based matching, and selection of relevant medical concepts in reference terminologies, and (5) specifications of a component-based architecture for the monitoring system. Results Considering the 5 major challenges, we (1) selected a set of 21 validated criteria for selecting social media to support the extraction of potential ADRs, (2) proposed solutions to guarantee data privacy of patients posting on Internet, (3) took into account pharmacovigilance expert requirements with use case diagrams and scenarios, (4) built domain-specific knowledge resources embeding a lexicon, morphological rules, context rules, semantic rules, syntactic rules, and post-analysis processing, and (5) proposed a component-based architecture that allows storage of big data and accessibility to third-party applications through Web services. Conclusions We demonstrated the feasibility of implementing a component-based architecture that allows collection of patient posts on the Internet, near real-time processing of those posts including annotation, and storage in big data structures. In the next steps, we will evaluate the posts identified by the system in social media to clarify the interest and relevance of such approach to improve conventional pharmacovigilance processes based on spontaneous reporting. PMID:28935617

  14. Requirements management for Gemini Observatory: a small organization with big development projects

    NASA Astrophysics Data System (ADS)

    Close, Madeline; Serio, Andrew; Cordova, Martin; Hardie, Kayla

    2016-08-01

    Gemini Observatory is an astronomical observatory operating two premier 8m-class telescopes, one in each hemisphere. As an operational facility, a majority of Gemini's resources are spent on operations however the observatory undertakes major development projects as well. Current projects include new facility science instruments, an operational paradigm shift to full remote operations, and new operations tools for planning, configuration and change control. Three years ago, Gemini determined that a specialized requirements management tool was needed. Over the next year, the Gemini Systems Engineering Group investigated several tools, selected one for a trial period and configured it for use. Configuration activities including definition of systems engineering processes, development of a requirements framework, and assignment of project roles to tool roles. Test projects were implemented in the tool. At the conclusion of the trial, the group determined that the Gemini could meet its requirements management needs without use of a specialized requirements management tool, and the group identified a number of lessons learned which are described in the last major section of this paper. These lessons learned include how to conduct an organizational needs analysis prior to pursuing a tool; caveats concerning tool criteria and the selection process; the prerequisites and sequence of activities necessary to achieve an optimum configuration of the tool; the need for adequate staff resources and staff training; and a special note regarding organizations in transition and archiving of requirements.

  15. [Claim and reality of selective contact options : experiences in finalizing selective contracts in urological care].

    PubMed

    Ex, P; Schroeder, A

    2014-08-01

    Selective contracts are an important component in addition to the total healthcare concept in order to introduce process-related innovations into the healthcare system. Since 2011 the Berufsverband der Deutschen Urologen (BDU, Professional Association of German Urologists) has held negotiations with individual health insurance companies and care providers in order to view selective contracts as collective contracts, not only as pilot projects but also as additional forms of care.This article illustrates the experiences of the BDU in the initiation and finalizing of selective contracts as well as existing weak points in the framework conditions.

  16. Quality initiatives: planning, setting up, and carrying out radiology process improvement projects.

    PubMed

    Tamm, Eric P; Szklaruk, Janio; Puthooran, Leejo; Stone, Danna; Stevens, Brian L; Modaro, Cathy

    2012-01-01

    In the coming decades, those who provide radiologic imaging services will be increasingly challenged by the economic, demographic, and political forces affecting healthcare to improve their efficiency, enhance the value of their services, and achieve greater customer satisfaction. It is essential that radiologists master and consistently apply basic process improvement skills that have allowed professionals in many other fields to thrive in a competitive environment. The authors provide a step-by-step overview of process improvement from the perspective of a radiologic imaging practice by describing their experience in conducting a process improvement project: to increase the daily volume of body magnetic resonance imaging examinations performed at their institution. The first step in any process improvement project is to identify and prioritize opportunities for improvement in the work process. Next, an effective project team must be formed that includes representatives of all participants in the process. An achievable aim must be formulated, appropriate measures selected, and baseline data collected to determine the effects of subsequent efforts to achieve the aim. Each aspect of the process in question is then analyzed by using appropriate tools (eg, flowcharts, fishbone diagrams, Pareto diagrams) to identify opportunities for beneficial change. Plans for change are then established and implemented with regular measurements and review followed by necessary adjustments in course. These so-called PDSA (planning, doing, studying, and acting) cycles are repeated until the aim is achieved or modified and the project closed.

  17. Informal worker phenomenon in housing construction project

    NASA Astrophysics Data System (ADS)

    Wijayaningtyas, Maranatha; Sipan, Ibrahim; Lukiyanto, Kukuh

    2017-11-01

    The informal workers phenomenon on housing construction projects in Indonesia is different from workers in other sectors who would always request as permanent employees. Substantively, the informal workers are disinclined to be bound as permanent employees which different from the general labor paradigm. Hence, the objective of this study is to find out how the labour selection process, the factors that affected their performance, and the suitable wage system to achieve the target completion of housing construction project. The qualitative method is used to uncover and understand the meaning behind the phenomena (numina) of informal workers action and their influence on housing construction project which called phenomenological approach. Five informal workers and two project managers were selected as informants based on predetermined criteria with in-depth interviews. The results showed that the informal worker were more satisfied with the wage based on unit price while working in the housing construction project for the flexibility in working hours. In addition, the developer was also relieved because they only control the quality and the achievement of the project completion time which supported by informal worker leader. Therefore, these findings are beneficial for both of developer and government as policy maker to succeed the housing program in Indonesia.

  18. Selection of priority investment projects for the development of the Russian Arctic

    NASA Astrophysics Data System (ADS)

    Novoselov, A.; Potravny, I.; Novoselova, I.; Gassiy, V.

    2017-12-01

    In the Russian Arctic, there is currently an active process of preparation and implementation of investment projects aiming to extract natural resources, with the aim of sustainable socioeconomic development of the region. These projects are associated with the development of key zones in the Arctic and involve the exploration for and production of minerals (diamonds, gold, rare-earth metals, oil, and gas) and the development of energy and infrastructure (e.g., the Northern Sea Route). Such projects, which are often carried out in territories of traditional nature management belonging to the indigenous peoples of the North, must consider their environmental and social responsibility and the preservation of the ethnic identity and culture of indigenous peoples. The extraction of mineral deposits in the Arctic and the Far North places new demands on subsoil users, related to the preservation and development of the socio-cultural environment of the indigenous peoples of the North and to the ecological rehabilitation of the area. This article presents economic and mathematical models for selecting the optimal development project options based on the pairwise comparison of investment projects and the evaluation of indigenous peoples' preferences. We investigated the investment projects' impact on traditional territories in the Arctic, including the Republic of Sakha (Yakutia), in terms of socioeconomic and ethnological development, and environmental change. The suggested system of models can be used to assess the priority of projects supporting and developing the region in the mining corporation's area of responsibility. The proposed models are based on fuzzy set theory, which provides an effective assessment of the population's preferences for projects. Data are processed using the hierarchy analysis method and multivariate optimization calculations to determine the project sets at different funding levels. The creation of information-linked processing models is innovative. Indigenous people's expert assessments of the priority of projects are processed using the hierarchy analysis method to determine the coefficients of the optimization model that enables the calculation of the choice between the analyzed projects, given the allocated financial resources. This approach can be used to address issues of support for indigenous people in areas where mining and other economic development activities are taking place, especially in the Arctic region. The proposed decision-making mechanism, which includes public hearings, sociological surveys, ethnological expertise, and compensation payments to indigenous minorities of the North, facilitates the justification of optimal strategies for maintaining and developing the region, taking into account economic, ecological, social, and ethnological factors.

  19. An overview of the thematic mapper geometric correction system

    NASA Technical Reports Server (NTRS)

    Beyer, E. P.

    1983-01-01

    Geometric accuracy specifications for LANDSAT 4 are reviewed and the processing concepts which form the basis of NASA's thematic mapper geometric correction system are summarized for both the flight and ground segments. The flight segment includes the thematic mapper instrument, attitude measurement devices, attitude control, and ephemeris processing. For geometric correction the ground segment uses mirror scan correction data, payload correction data, and control point information to determine where TM detector samples fall on output map projection systems. Then the raw imagery is reformatted and resampled to produce image samples on a selected output projection grid system.

  20. Scientific Programming Using Java and C: A Remote Sensing Example

    NASA Technical Reports Server (NTRS)

    Prados, Donald; Johnson, Michael; Mohamed, Mohamed A.; Cao, Chang-Yong; Gasser, Jerry; Powell, Don; McGregor, Lloyd

    1999-01-01

    This paper presents results of a project to port code for processing remotely sensed data from the UNIX environment to Windows. Factors considered during this process include time schedule, cost, resource availability, reuse of existing code, rapid interface development, ease of integration, and platform independence. The approach selected for this project used both Java and C. By using Java for the graphical user interface and C for the domain model, the strengths of both languages were utilized and the resulting code can easily be ported to other platforms. The advantages of this approach are discussed in this paper.

  1. The Right Student: An Exploration of the Qualities Desired in the Next Generation of Nursing Students, Leading to Improved Selection Processes within Nursing and Midwifery

    ERIC Educational Resources Information Center

    Norrie, Peter; Day, Jacqui; Ford, Karen; Knifton, Christopher; Welyczko, Nicola; Harrison, Penny; Robson, Elizabeth; Tremayne, Penny

    2012-01-01

    This project explored ways in which student selection in nursing can be developed. Original research was undertaken throughout the United Kingdom using qualitative interviews with a range of academic staff and partners from practice. A conceptual framework was produced which identified five categories which can confidently be seen as…

  2. AN APPROACH TO COST EFFECTIVENESS OF A SELECTIVE MECHANIZED DOCUMENT PROCESSING SYSTEM. ARMY TECHNICAL LIBRARY IMPROVEMENT STUDIES (ATLIS), REPORT NO. 12.

    ERIC Educational Resources Information Center

    SEGARRA, CARLOS O.

    THE PURPOSE OF THE PROJECT WAS TO IDENTIFY AND DEFINE THE PARAMETERS OF AN ECONOMICAL AND PRACTICAL INFORMATION SYSTEM FOR THE U.S. ARMY ENGINEER RESEARCH AND DEVELOPMENT LABORATORIES. THE PROGRAM INCLUDED FOUR PHASES--(1) DATA REQUIREMENTS DEFINITION, (2) COST ANALYSIS AND SYSTEM DEFINITION, (3) HARDWARE SELECTION, SYSTEM TEST AND EVALUATION, AND…

  3. Proceedings from the U.S. Army Corps of Engineers (USACE) and the National Oceanic and Atmospheric Administration (NOAA) Engineering With Nature Workshop

    DTIC Science & Technology

    2017-03-01

    opportunities emerged. It will be essential to capture and share lessons learned as the two organizations plan and implement selected EWN projects...their top five or six opportunities and subsequently selected the two highest priorities. Each of the three breakout groups then worked together to...will ensure agency buy-in, establish local reference sites, and promote EWN principles. Site selection will include an iterative process that factors

  4. NASA Electronic Parts and Packaging Program

    NASA Technical Reports Server (NTRS)

    Kayali, Sammy

    2000-01-01

    NEPP program objectives are to: (1) Access the reliability of newly available electronic parts and packaging technologies for usage on NASA projects through validations, assessments, and characterizations, and the development of test methods/tools; (2)Expedite infusion paths for advanced (emerging) electronic parts and packaging technologies by evaluations of readiness for manufacturability and project usage consideration; (3) Provide NASA projects with technology selection, application, and validation guidelines for electronic parts and packaging hardware and processes; nd (4) Retain and disseminate electronic parts and packaging quality assurance, reliability validations, tools, and availability information to the NASA community.

  5. Putting Technology to Work in Science - How to Select Unmanned Aerial Vehicles (UAV) and their Instrumentation for Atmospheric and Earth Surface Observations

    NASA Astrophysics Data System (ADS)

    Teller, Amit; Lange, Manfred; Ioannou, Stelios; Keleshis, Christos

    2010-05-01

    The Autonomous Flying Platforms for Atmospheric and Earth Surface Observations project (APAESO) of the Energy, Environment and Water Research Center (EEWRC) at the Cyprus Institute is aimed at the dual purpose of carrying out atmospheric and earth-surface observations in the Mediterranean. The APAESO platforms will offer the unique potential to determine physical, chemical and radiative atmospheric properties, aerosol and dust concentrations, atmospheric dynamics, surface morphology, vegetation and land use patterns as well as ocean surface properties (biology, waves, currents) and to carry out archaeological site reconnaissance and contaminant detection at high spatial resolution. The first phase of APAESO was dedicated to the preliminary design and the selection of an Unmanned Aerial Vehicle (UAV) as the backbone of the APAESO infrastructure. Selection of a UAV suitable for the many research objectives as outlined above is challenging because the UAV technology is new and rapidly evolving. This notwithstanding, a very large number of systems, mostly utilized for defense purposes, are currently available. The major challenge in the selection process lies in considering the trade-off between different platform characteristics (e.g. payload weight, endurance, max. altitude for operation and price) and in optimizing the potential performance of the UAV. Based on the required characteristics for the UAV platform, a survey of possible UAVs and suitable sensors was prepared based on various data sources. We used an elimination process in order to consider only a few models for the final selection process out of about 1000 commercially available UAV models that were initially investigated. The presentation will discuss the main scientific objectives that determine the specification of the UAV platform, major considerations in selecting best available technology for our needs and will briefly describe the next phases of the project.

  6. Data-driven freeway performance evaluation framework for project prioritization and decision making.

    DOT National Transportation Integrated Search

    2017-01-01

    This report describes methods that potentially can be incorporated into the performance monitoring and planning processes for freeway performance evaluation and decision making. Reliability analysis was conducted on the selected I-15 corridor by empl...

  7. Data-driven freeway performance evaluation framework for project prioritization and decision making.

    DOT National Transportation Integrated Search

    2015-03-01

    This report describes methods that potentially can be incorporated into the performance monitoring and planning : processes for freeway performance evaluation and decision making. Reliability analysis is conducted on the selected : I-15 corridor by e...

  8. Evaluation of hot in-place recycle.

    DOT National Transportation Integrated Search

    2010-06-01

    This report documents the construction of hot in-place recycled (HIPR) pavement on SR 542. : HIPR is a process by which rehabilitation of the existing HMA pavement occurs on site in one : operation. HIPR project selection, mix design, construction an...

  9. Application and project portfolio valuation using enterprise architecture and business requirements modelling

    NASA Astrophysics Data System (ADS)

    Quartel, Dick; Steen, Maarten W. A.; Lankhorst, Marc M.

    2012-05-01

    This article describes an architecture-based approach to IT valuation. This approach offers organisations an instrument to valuate their application and project portfolios and to make well-balanced decisions about IT investments. The value of a software application is assessed in terms of its contribution to a selection of business goals. Based on such assessments, the value of different applications can be compared, and requirements for innovation, development, maintenance and phasing out can be identified. IT projects are proposed to realise the requirements. The value of each project is assessed in terms of the value it adds to one or more applications. This value can be obtained by relating the 'as-is' application portfolio to the 'to-be' portfolio that is being proposed by the project portfolio. In this way, projects can be ranked according to their added value, given a certain selection of business goals. The approach uses ArchiMate to model the relationship between software applications, business processes, services and products. In addition, two language extensions are used to model the relationship of these elements to business goals and requirements and to projects and project portfolios. The approach is illustrated using the portfolio method of Bedell and has been implemented in BiZZdesign Architect.

  10. Shuttle Student Involvement Project for Secondary Schools

    NASA Technical Reports Server (NTRS)

    Wilson, G. P.; Ladwig, A.

    1981-01-01

    The National Aeronautics and Space Administration (NASA) has initiated the Shuttle Student Involvement Project for Secondary Schools (SSIP-S), an annual nationwide competition to select student proposals for experiments suitable for flight aboard the Space Shuttle. The objective of the project is to stimulate the study of science and technology in grades 9 through 12 by directly relating students to a space research program. This paper will analyze the first year of the project from a standpoint of how the competition was administered; the number and types of proposals that were submitted; and will discuss the process involved in preparing the winning experiments for eventual flight.

  11. SNRB{trademark} air toxics monitoring. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-01-01

    Babcock & Wilcox (B&W) is currently conducting a project under the DOE`s Clean Coal Technology (CCT II) Program to demonstrate its SO{sub x}NO{sub x}-Rox Box{trademark} (SNRB{trademark}) process in a 5 MWe Field Demonstration Unit at Ohio Edison`s R. E. Burger Plant near Shadyside, Ohio. The objective of the SNRB{trademark} Air Toxics Monitoring Project was to provide data on SNRB{trademark} air toxics emissions control performance to B&W and to add to the DOE/EPRI/EPA data base by quantifying the flow rates of selected hazardous substances (or air toxics) in all of the major input and output streams of the SNRB{trademark} process asmore » well as the power plant. Work under the project included the collection and analysis of representative samples of all major input and output streams of the SNRB{trademark} demonstration unit and the power plant, and the subsequent laboratory analysis of these samples to determine the partitioning of the hazardous substances between the various process streams. Material balances for selected air toxics were subsequently calculated around the SNRB{trademark} and host boiler systems, including the removal efficiencies across each of the major air pollution control devices. This report presents results of the SNRB{trademark} Air Toxics Monitoring Project. In addition to the Introduction, a brief description of the test site, including the Boiler No. 8 and the SNRB{trademark} process, is included in Section H. The concentrations of air toxic emissions are presented in Section II according to compound class. Material balances are included in Section IV for three major systems: boiler, electrostatic precipitator, and SNRB{trademark}. Emission factors and removal efficiencies are also presented according to compound class in Sections V and VI, respectively. A data evaluation is provided in Section VII.« less

  12. Adaptive multifocus image fusion using block compressed sensing with smoothed projected Landweber integration in the wavelet domain.

    PubMed

    V S, Unni; Mishra, Deepak; Subrahmanyam, G R K S

    2016-12-01

    The need for image fusion in current image processing systems is increasing mainly due to the increased number and variety of image acquisition techniques. Image fusion is the process of combining substantial information from several sensors using mathematical techniques in order to create a single composite image that will be more comprehensive and thus more useful for a human operator or other computer vision tasks. This paper presents a new approach to multifocus image fusion based on sparse signal representation. Block-based compressive sensing integrated with a projection-driven compressive sensing (CS) recovery that encourages sparsity in the wavelet domain is used as a method to get the focused image from a set of out-of-focus images. Compression is achieved during the image acquisition process using a block compressive sensing method. An adaptive thresholding technique within the smoothed projected Landweber recovery process reconstructs high-resolution focused images from low-dimensional CS measurements of out-of-focus images. Discrete wavelet transform and dual-tree complex wavelet transform are used as the sparsifying basis for the proposed fusion. The main finding lies in the fact that sparsification enables a better selection of the fusion coefficients and hence better fusion. A Laplacian mixture model fit is done in the wavelet domain and estimation of the probability density function (pdf) parameters by expectation maximization leads us to the proper selection of the coefficients of the fused image. Using the proposed method compared with the fusion scheme without employing the projected Landweber (PL) scheme and the other existing CS-based fusion approaches, it is observed that with fewer samples itself, the proposed method outperforms other approaches.

  13. Collaborative Measurement Development as a Tool in CBPR: Measurement Development and Adaptation within the Cultures of Communities

    PubMed Central

    Gonzalez, John; Trickett, Edison J.

    2014-01-01

    This paper describes the processes we engaged in to develop a measurement protocol used to assess the outcomes in a community based suicide and alcohol abuse prevention project with two Alaska Native communities. While the literature on community-based participatory research (CBPR) is substantial regarding the importance of collaborations, few studies have reported on this collaboration in the process of developing measures to assess CBPR projects. We first tell a story of the processes around the standard issues of doing cross-cultural work on measurement development related to areas of equivalence. A second story is provided that highlights how community differences within the same cultural group can affect both the process and content of culturally relevant measurement selection, adaptation, and development. PMID:24748283

  14. Collaborative measurement development as a tool in CBPR: measurement development and adaptation within the cultures of communities.

    PubMed

    Gonzalez, John; Trickett, Edison J

    2014-09-01

    This paper describes the processes we engaged into develop a measurement protocol used to assess the outcomes in a community based suicide and alcohol abuse prevention project with two Alaska Native communities. While the literature on community-based participatory research (CBPR) is substantial regarding the importance of collaborations, few studies have reported on this collaboration in the process of developing measures to assess CBPR projects. We first tell a story of the processes around the standard issues of doing cross-cultural work on measurement development related to areas of equivalence. A second story is provided that highlights how community differences within the same cultural group can affect both the process and content of culturally relevant measurement selection, adaptation, and development.

  15. Space-planning and structural solutions of low-rise buildings: Optimal selection methods

    NASA Astrophysics Data System (ADS)

    Gusakova, Natalya; Minaev, Nikolay; Filushina, Kristina; Dobrynina, Olga; Gusakov, Alexander

    2017-11-01

    The present study is devoted to elaboration of methodology used to select appropriately the space-planning and structural solutions in low-rise buildings. Objective of the study is working out the system of criteria influencing the selection of space-planning and structural solutions which are most suitable for low-rise buildings and structures. Application of the defined criteria in practice aim to enhance the efficiency of capital investments, energy and resource saving, create comfortable conditions for the population considering climatic zoning of the construction site. Developments of the project can be applied while implementing investment-construction projects of low-rise housing at different kinds of territories based on the local building materials. The system of criteria influencing the optimal selection of space-planning and structural solutions of low-rise buildings has been developed. Methodological basis has been also elaborated to assess optimal selection of space-planning and structural solutions of low-rise buildings satisfying the requirements of energy-efficiency, comfort and safety, and economical efficiency. Elaborated methodology enables to intensify the processes of low-rise construction development for different types of territories taking into account climatic zoning of the construction site. Stimulation of low-rise construction processes should be based on the system of approaches which are scientifically justified; thus it allows enhancing energy efficiency, comfort, safety and economical effectiveness of low-rise buildings.

  16. IPAD project overview

    NASA Technical Reports Server (NTRS)

    Fulton, R. E.

    1980-01-01

    To respond to national needs for improved productivity in engineering design and manufacturing, a NASA supported joint industry/government project is underway denoted Integrated Programs for Aerospace-Vehicle Design (IPAD). The objective is to improve engineering productivity through better use of computer technology. It focuses on development of technology and associated software for integrated company-wide management of engineering information. The project has been underway since 1976 under the guidance of an Industry Technical Advisory Board (ITAB) composed of representatives of major engineering and computer companies and in close collaboration with the Air Force Integrated Computer-Aided Manufacturing (ICAM) program. Results to date on the IPAD project include an in-depth documentation of a representative design process for a large engineering project, the definition and design of computer-aided design software needed to support that process, and the release of prototype software to integrate selected design functions. Ongoing work concentrates on development of prototype software to manage engineering information, and initial software is nearing release.

  17. The Use of Radar to Improve Rainfall Estimation over the Tennessee and San Joaquin River Valleys

    NASA Technical Reports Server (NTRS)

    Petersen, Walter A.; Gatlin, Patrick N.; Felix, Mariana; Carey, Lawrence D.

    2010-01-01

    This slide presentation provides an overview of the collaborative radar rainfall project between the Tennessee Valley Authority (TVA), the Von Braun Center for Science & Innovation (VCSI), NASA MSFC and UAHuntsville. Two systems were used in this project, Advanced Radar for Meteorological & Operational Research (ARMOR) Rainfall Estimation Processing System (AREPS), a demonstration project of real-time radar rainfall using a research radar and NEXRAD Rainfall Estimation Processing System (NREPS). The objectives, methodology, some results and validation, operational experience and lessons learned are reviewed. The presentation. Another project that is using radar to improve rainfall estimations is in California, specifically the San Joaquin River Valley. This is part of a overall project to develop a integrated tool to assist water management within the San Joaquin River Valley. This involves integrating several components: (1) Radar precipitation estimates, (2) Distributed hydro model, (3) Snowfall measurements and Surface temperature / moisture measurements. NREPS was selected to provide precipitation component.

  18. Solutions for Digital Video Transmission Technology Final Report CRADA No. TC02068.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, A. T.; Rivers, W.

    This Project aimed at development of software for seismic data processing based on the Geotool code developed by the American company Multimax., Inc. The Geotool code was written in early 90-es for the UNIX platform. Under Project# 2821, functions of the old Geotool code were transferred into a commercial version for the Microsoft XP and Vista platform with addition of new capabilities on visualization and data processing. The developed new version of the Geotool+ was implemented using the up-to-date tool Microsoft Visual Studio 2005 and uses capabilities of the .NET platform. C++ was selected as the main programming language formore » the Geotool+. The two-year Project was extended by six months and funding levels increased from 600,000 to $670,000. All tasks were successfully completed and all deliverables were met for the project even though both the industrial partner and LLNL principal investigator left the project before its final report.« less

  19. Project SunbYte: solar astronomy on a budget

    NASA Astrophysics Data System (ADS)

    Alvarez Gonzalez, F.; Badilita, A.-M.; Baker, A.; Cho, Y.-H.; Dhot, N.; Fedun, V.; Hare, C.; He, T.; Hobbs, M.; Javed, M.; Lovesey, H.; Lord, C.; Panoutsos, G.; Permyakov, A.; Pope, S.; Portnell, M.; Rhodes, L.; Sharma, R.; Taras, P.; Taylor, J.; Tilbrook, R.; Verth, G.; Wrigley, S. N.; Yaqoob, M.; Cook, R.; McLaughlin, J.; Morton, R.; Scullion, E.; Shelyag, S.; Hamilton, A.; Zharkov, S.; Jess, D.; Wrigley, M.

    2017-04-01

    The Sheffield University Nova Balloon Lifted Solar Telescope (SunbYte) is a high-altitude balloon experiment devised and run largely by students at the University of Sheffield, and is scheduled for launch in October 2017. It was the only UK project in 2016 to be selected for the balloon side of the Swedish-German student programme REXUS/BEXUS (Rocket and Balloon Experiments for University Students; see box on p2.25). The success of the SunbYte team in the REXUS/BEXUS selection process is an unprecedented opportunity for the students to gain valuable experience working in the space engineering industry, using their theoretical knowledge and networking with students and technology companies from all over Europe.

  20. Financial arrangement selection for energy management projects

    NASA Astrophysics Data System (ADS)

    Woodroof, Eric Aubrey

    Scope and method of study. The purpose of this study was to develop a model (E-FUND) to help facility managers select financial arrangements for energy management projects (EMPs). The model was developed with the help of a panel of expert financiers. The panel also helped develop a list of key objectives critical to the decision process. The E-FUND model was tested by a population of facility managers in four case studies. Findings and conclusions. The results may indicate that having a high economic benefit (from an EMP) is not overwhelmingly important, when compared to other qualitative objectives. The results may also indicate that the true lease and performance contract may be the most applicable financial arrangements for EMPs.

  1. Design of a vehicle based system to prevent ozone loss

    NASA Technical Reports Server (NTRS)

    Talbot, Matthew D.; Eby, Steven C.; Ireland, Glen J.; Mcwithey, Michael C.; Schneider, Mark S.; Youngblood, Daniel L.; Johnson, Matt; Taylor, Chris

    1994-01-01

    This project is designed to be completed over a three year period. Overall project goals are: (1) to understand the processes that contribute to stratospheric ozone loss; (2) to determine the best scheme to prevent ozone loss; and (3) to design a vehicle based system to carry out the prevention scheme. The 1993/1994 design objectives included: (1) to review the results of the 1992/1993 design team, including a reevaluation of the key assumptions used; (2) to develop a matrix of baseline vehicle concepts as candidates for the delivery vehicle; and (3) to develop a selection criteria and perform quantitative trade studies to use in the selection of the specific vehicle concept.

  2. Development of a carbonaceous selective absorber for solar thermal energy collection and process for its formation

    NASA Astrophysics Data System (ADS)

    Garrison, John D.

    1989-02-01

    The main goal of the US Department of Energy supported part of this project is to develop information about controlling the complicated chemical processes involved in the formation of a carbonaceous selective absorber and learn what equipment will allow production of this absorber commercially. The work necessary to accomplish this goal is not yet complete. Formation of the carbonaceous selective absorber in the conveyor oven tried so far has been unsatisfactory, because the proper conditions for applying the carbonaceous coating in each conveyor oven fabricated, either have been difficult to obtain, or have been difficult to maintain over an extended period of time. A new conveyor oven is nearing completion which is expected to allow formation of the carbonaceous selective absorber on absorber tubes in a continuous operation over many days without the necessity of cleaning the conveyor oven or changing the thickness of the electroplated nickel catalyst to compensate for changes in the coating environment in the oven. Work under this project concerned with forming and sealing glass panels to test ideas on evacuated glass solar collector designs and production have been generally quite satisfactory. Delays in completion of the selective absorber work, has caused postponement of the fabrication of a small prototype evacuated glass solar collector panel. Preliminary cost estimates of the selective absorber and solar collector panel indicate that this collector system should be lower in cost than evacuated solar collectors now on the market.

  3. Bureau of Labor Statistics Employment Projections: Detailed Analysis of Selected Occupations and Industries. Report to the Honorable Berkley Bedell, United States House of Representatives.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC.

    To compile its projections of future employment levels, the Bureau of Labor Statistics (BLS) combines the following five interlinked models in a six-step process: a labor force model, an econometric model of the U.S. economy, an industry activity model, an industry labor demand model, and an occupational labor demand model. The BLS was asked to…

  4. Data Sparsity Considerations in Climate Impact Analysis for the Water Sector (Invited)

    NASA Astrophysics Data System (ADS)

    Asante, K. O.; Khimsara, P.; Chan, A.

    2013-12-01

    Scientists and planners are helping governments and communities around the world to prepare for climate change by performing local impact studies and developing adaptation plans. Most studies begin by analyzing global climate models outputs to estimate the magnitude of projected change, assessing vulnerabilities and proposing adaptation measures. In these studies, climate projections from the Intergovernmental Panel on Climate Change (IPCC) Data Distribution Centre (DDC) are either used directly or downscaled using regional models. Since climate projections cover the entire global, climate change analysis can be performed for any location. However, selection of climate projections for use in historically data sparse regions presents special challenges. Key questions arise about the impact of historical data sparsity on quality of climate projections, spatial consistency of results and suitability for applications such as water resource planning. In this paper, a water-sector climate study conducted in a data-rich setting in California is compared to a similar study conducted a data-sparse setting in Mozambique. The challenges of selecting projections, performing analysis and interpreting the results for climate adaption planning are compared to illustrate the decision process and challenges encountered in these two very different settings.

  5. 7 CFR 1942.17 - Community facilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... economic purposes a single community having a contiguous boundary. (2) Project selection process. The... efficient management and economical service; and/or enlarge, extend, or otherwise modify existing facilities... account for items such as geographic distribution of funds and emergency conditions caused by economic...

  6. 7 CFR 1942.17 - Community facilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... economic purposes a single community having a contiguous boundary. (2) Project selection process. The... efficient management and economical service; and/or enlarge, extend, or otherwise modify existing facilities... account for items such as geographic distribution of funds and emergency conditions caused by economic...

  7. 7 CFR 1942.17 - Community facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... economic purposes a single community having a contiguous boundary. (2) Project selection process. The... efficient management and economical service; and/or enlarge, extend, or otherwise modify existing facilities... account for items such as geographic distribution of funds and emergency conditions caused by economic...

  8. 7 CFR 1942.17 - Community facilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... economic purposes a single community having a contiguous boundary. (2) Project selection process. The... efficient management and economical service; and/or enlarge, extend, or otherwise modify existing facilities... account for items such as geographic distribution of funds and emergency conditions caused by economic...

  9. Design and implementation of an automated compound management system in support of lead optimization.

    PubMed

    Quintero, Catherine; Kariv, Ilona

    2009-06-01

    To meet the needs of the increasingly rapid and parallelized lead optimization process, a fully integrated local compound storage and liquid handling system was designed and implemented to automate the generation of assay-ready plates directly from newly submitted and cherry-picked compounds. A key feature of the system is the ability to create project- or assay-specific compound-handling methods, which provide flexibility for any combination of plate types, layouts, and plate bar-codes. Project-specific workflows can be created by linking methods for processing new and cherry-picked compounds and control additions to produce a complete compound set for both biological testing and local storage in one uninterrupted workflow. A flexible cherry-pick approach allows for multiple, user-defined strategies to select the most appropriate replicate of a compound for retesting. Examples of custom selection parameters include available volume, compound batch, and number of freeze/thaw cycles. This adaptable and integrated combination of software and hardware provides a basis for reducing cycle time, fully automating compound processing, and ultimately increasing the rate at which accurate, biologically relevant results can be produced for compounds of interest in the lead optimization process.

  10. Economic feasibility of solar thermal industrial applications and selected case studies

    NASA Astrophysics Data System (ADS)

    Montelione, A.; Boyd, D.; Branz, M.

    1981-12-01

    The economic feasibility is assessed of utilizing solar energy to augment an existing fossil fuel system to generate industrial process heat. Several case studies in the textile and food processing industries in the southern United States were analyzed. Sensitivity analyses were performed, and comparisons illustrating the effects of the Economic Recovery Tax Act of 1981 were made. The economic desirability of the proposed solar systems varied with the type of system selected, location of the facility, state tax credits, and type of fuel displaced. For those systems presently not economical, the projected time to economic feasibility was ascertained.

  11. Evaluation and Selection of Predicaments in Pharmaceutical Supply Chain using AHP under Fuzzy Environment

    NASA Astrophysics Data System (ADS)

    Nikhil, E. V. S.; Sai Ram, V.; Charan Yadav, V.; Kiran Kumar, Kalla; Nagaraju, Dega

    2017-05-01

    Pharmaceutical sector plays an important role in the medical and health system. Due to the globalization of the business, increasing demand and supply for drugs, growing regulatory requirements, all stages of the pharmaceutical supply chain (SC) are facing numerous predicaments. The traditional way of selection and evaluation of these predicaments is customarily done using technical information. This approach lacks the ability to project the burning issue that to be addressed first. Hence, a computing method of selecting the crucial issue from the existing issues is essential in a pharmaceutical supply chain. This paper considers seven different predicaments as criteria and five sub-criteria under each main predicament of a pharmaceutical supply chain. The intention of this project is to manifest the process of assessing and selecting the issue that to be addressed first by using multi-criteria decision making technique (MCDM), i.e., fuzzy analytical hierarchy process (FAHP). The criteria and sub-criteria weights are calculated and priority assessment of the predicaments is done by using FAHP. Finally, from the findings of this work, the predicaments are ranked from most important to least important. This gives information to the decision maker (DM) to solve the issue that is affecting the SC the most with respect to the others.

  12. Maintenance of Certification: How Performance in Practice Changes Improve Tobacco Cessation in Addiction Psychiatrists’ Practice

    PubMed Central

    Ford, James H.; Oliver, Karen A.; Giles, Miriam; Cates-Wessel, Kathryn; Krahn, Dean; Levin, Frances R.

    2017-01-01

    Background and Objectives In 2000, the American Board of Medical Specialties implemented the Maintenance of Certification (MOC), a structured process to help physicians identify and implement a quality improvement project to improve patient care. This study reports on findings from an MOC Performance in Practice (PIP) module designed and evaluated by addiction psychiatrists who are members of the American Academy of Addiction Psychiatry (AAAP). Method A 3-phase process was utilized to recruit AAAP members to participate in the study. The current study utilized data from 154 self-selected AAAP members who evaluated the effectiveness of the MOC Tobacco Cessation PIP. Results Of the physicians participating, 76% (n 120) completed the Tobacco PIP. A paired t-test analysis revealed that reported changes in clinical measure documentation were significant across all six measures. Targeted improvement efforts focused on a single clinical measure. Results found that simple change projects designed to improve clinical practice led to substantial changes in self-reported chart documentation for the selected measure. Conclusions The current findings suggest that addiction psychiatrists can leverage the MOC process to improve clinical care. PMID:27973746

  13. Sustainability in Health care by Allocating Resources Effectively (SHARE) 6: investigating methods to identify, prioritise, implement and evaluate disinvestment projects in a local healthcare setting.

    PubMed

    Harris, Claire; Allen, Kelly; Brooke, Vanessa; Dyer, Tim; Waller, Cara; King, Richard; Ramsey, Wayne; Mortimer, Duncan

    2017-05-25

    This is the sixth in a series of papers reporting Sustainability in Health care by Allocating Resources Effectively (SHARE) in a local healthcare setting. The SHARE program was established to investigate a systematic, integrated, evidence-based approach to disinvestment within a large Australian health service. This paper describes the methods employed in undertaking pilot disinvestment projects. It draws a number of lessons regarding the strengths and weaknesses of these methods; particularly regarding the crucial first step of identifying targets for disinvestment. Literature reviews, survey, interviews, consultation and workshops were used to capture and process the relevant information. A theoretical framework was adapted for evaluation and explication of disinvestment projects, including a taxonomy for the determinants of effectiveness, process of change and outcome measures. Implementation, evaluation and costing plans were developed. Four literature reviews were completed, surveys were received from 15 external experts, 65 interviews were conducted, 18 senior decision-makers attended a data gathering workshop, 22 experts and local informants were consulted, and four decision-making workshops were undertaken. Mechanisms to identify disinvestment targets and criteria for prioritisation and decision-making were investigated. A catalogue containing 184 evidence-based opportunities for disinvestment and an algorithm to identify disinvestment projects were developed. An Expression of Interest process identified two potential disinvestment projects. Seventeen additional projects were proposed through a non-systematic nomination process. Four of the 19 proposals were selected as pilot projects but only one reached the implementation stage. Factors with potential influence on the outcomes of disinvestment projects are discussed and barriers and enablers in the pilot projects are summarised. This study provides an in-depth insight into the experience of disinvestment in one local healthcare service. To our knowledge, this is the first paper to report the process of disinvestment from identification, through prioritisation and decision-making, to implementation and evaluation, and finally explication of the processes and outcomes.

  14. Review of potential EGS sites and possible EGS demonstration scenarios

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1999-09-01

    Review of potential sites for Enhanced Geothermal Systems (EGS) and development of reference scenarios for EGS demonstration projects are two sub-tasks included in the FY 1999 EGS Research and Development (R&D) Management Task (DOE Task Order Number DE-AT07-99ID60365, included in the Appendix of this report). These sub-tasks are consistent with the EGS Strategic Plan, which includes milestones relating to EGS site selection (Milestone 4, to be completed in 2004) and development of a cost-shared, pilot-scale demonstration project (Milestone 5, to be completed in 2008). The purpose of the present work is to provide some reference points for discussing what typemore » of EGS projects might be undertaken, where they might be located, and what the associated benefits are likely to be. The review of potential EGS sites is presented in Chapter 2 of this report. It draws upon site-selection criteria (and potential project sites that were identified using those criteria) developed at a mini-workshop held at the April 1998 DOE Geothermal Program Review to discuss EGS R&D issues. The criteria and the sites were the focus of a paper presented at the 4th International Hot Dry Rock Forum in Strasbourg in September 1998 (Sass and Robertson-Tait, 1998). The selection criteria, project sites and possible EGS developments discussed in the workshop and paper are described in more detail herein. Input from geothermal operators is incorporated, and water availability and transmission-line access are emphasized. The reference scenarios for EGS demonstration projects are presented in Chapter 3. Three alternative scenarios are discussed: (1) a stand-alone demonstration plant in an area with no existing geothermal development; (2) a separate generating facility adjacent to an existing geothermal development; and (3) an EGS project that supplies an existing geothermal power plant with additional generating capacity. Furthermore, information potentially useful to DOE in framing solicitations and selecting projects for funding is discussed objectively. Although defined as separate sub-tasks, the EGS site review and reference scenarios are closely related. The incremental approach to EGS development that has recently been adopted could logically be expected to yield proposals for studies that lead up to and include production-enhancement experiments in producing geothermal fields in the very near future. However, the strategic plan clearly calls for the development of a more comprehensive demonstration project that can generate up to perhaps 10 MW (gross). It is anticipated that a series of small-scale experiments will define what realistically may be achieved in the near future, thus setting the stage for a successful pilot demonstration. This report continues the process of presenting information on EGS sites and experiments, and begins the process of defining what a demonstration project might be.« less

  15. U.S. Department of Energy's site screening, site selection, and initial characterization for storage of CO2 in deep geological formations

    USGS Publications Warehouse

    Rodosta, T.D.; Litynski, J.T.; Plasynski, S.I.; Hickman, S.; Frailey, S.; Myer, L.

    2011-01-01

    The U.S. Department of Energy (DOE) is the lead Federal agency for the development and deployment of carbon sequestration technologies. As part of its mission to facilitate technology transfer and develop guidelines from lessons learned, DOE is developing a series of best practice manuals (BPMs) for carbon capture and storage (CCS). The "Site Screening, Site Selection, and Initial Characterization for Storage of CO2 in Deep Geological Formations" BPM is a compilation of best practices and includes flowchart diagrams illustrating the general decision making process for Site Screening, Site Selection, and Initial Characterization. The BPM integrates the knowledge gained from various programmatic efforts, with particular emphasis on the Characterization Phase through pilot-scale CO2 injection testing of the Validation Phase of the Regional Carbon Sequestration Partnership (RCSP) Initiative. Key geologic and surface elements that suitable candidate storage sites should possess are identified, along with example Site Screening, Site Selection, and Initial Characterization protocols for large-scale geologic storage projects located across diverse geologic and regional settings. This manual has been written as a working document, establishing a framework and methodology for proper site selection for CO2 geologic storage. This will be useful for future CO2 emitters, transporters, and storage providers. It will also be of use in informing local, regional, state, and national governmental agencies of best practices in proper sequestration site selection. Furthermore, it will educate the inquisitive general public on options and processes for geologic CO2 storage. In addition to providing best practices, the manual presents a geologic storage resource and capacity classification system. The system provides a "standard" to communicate storage and capacity estimates, uncertainty and project development risk, data guidelines and analyses for adequate site characterization, and guidelines for reporting estimates within the classification based on each project's status. 

  16. MO-F-211-01: Methods for Completing Practice Quality Improvement (PQI).

    PubMed

    Johnson, J; Brown, K; Ibbott, G; Pawlicki, T

    2012-06-01

    Practice Quality Improvement (PQI) is becoming an expected part of routine practice in healthcare as an approach to provide more efficient, effective and high quality care. Additionally, as part of the ABR's Maintenance of Certification (MOC) pathway, medical physicists are now expected to complete a PQI project. This session will describe the history behind and benefits of the ABR's MOC program, provide details of quality improvement methods and how to successfully complete a PQI project. PQI methods include various commonly used engineering and management tools. The Plan-Do-Study-Act (PDSA) cycle will be presented as one project planning and implementation tool. Other PQI analysis instruments such as flowcharts, Pareto charts, process control charts and fishbone diagrams will also be explained with examples. Cause analysis, solution development and implementation, and post-implementation measurement will be presented. Project identification and definition as well as appropriate measurement tool selection will be offered. Methods to choose key quality metrics (key quality indicators) will also be addressed. Several sample PQI projects and templates available through the AAPM and other organizations will be described. At least three examples of completed PQI projects will be shared. 1. Identify and define a PQI project 2. Identify and select measurement methods/techniques for use with the PQI project 3. Describe example(s) of completed projects. © 2012 American Association of Physicists in Medicine.

  17. Software for improving the quality of project management, a case study: international manufacture of electrical equipment

    NASA Astrophysics Data System (ADS)

    Preradović, D. M.; Mićić, Lj S.; Barz, C.

    2017-05-01

    Production conditions in today’s world require software support at every stage of production and development of new products, for quality assurance and compliance with ISO standards. In addition to ISO standards such as usual metrics of quality, companies today are focused on other optional standards, such as CMMI (Capability Maturity Model Integrated) or prescribing they own standards. However, while there is intensive progress being made in the PM (project management), there is still a significant number of projects, at the global level, that are failures. These have failed to achieve their goals, within budget or timeframe. This paper focuses on checking the role of software tools through the rate of success in projects implemented in the case of internationally manufactured electrical equipment. The results of this research show the level of contribution of the project management software used to manage and develop new products to improve PM processes and PM functions, and how selection of the software tools affects the quality of PM processes and successfully completed projects.

  18. Transgenic mice reveal unexpected diversity of On-Off direction selective retinal ganglion cell subtypes and brain structures involved in motion processing

    PubMed Central

    Rivlin-Etzion, Michal; Zhou, Kaili; Wei, Wei; Elstrott, Justin; Nguyen, Phong L.; Barres, Ben; Huberman, Andrew D.; Feller, Marla B.

    2011-01-01

    On-Off direction selective retinal ganglion cells (DSGCs) encode the axis of visual motion. They respond strongly to an object moving in a preferred direction and weakly to an object moving in the opposite, ‘null’, direction. Historically, On-Off DSGCs were classified into 4 subtypes according to their directional preference (anterior, posterior, superior or inferior). Here, we compare two genetically identified populations of On-Off DSGCs: DRD4-DSGCs and TRHR-DSGCs. We find that although both populations are tuned for posterior motion, they can be distinguished by a variety of physiological and anatomical criteria. First, the directional tuning of TRHR-DSGCs is broader than that of DRD4-DSGCs. Second, whereas both populations project similarly to the dorsal lateral geniculate nucleus, they project differently to the ventral lateral geniculate nucleus and the superior colliculus. Moreover, TRHR-DSGCs, but not DRD4-DSGCs, also project to the zona incerta, a thalamic area not previously known to receive direction-tuned visual information. Our findings reveal unexpected diversity among mouse On-Off DSGC subtypes that uniquely process and convey image motion to the brain. PMID:21677160

  19. An overview of turbomachinery project in Malaysian oil and gas industry

    NASA Astrophysics Data System (ADS)

    Abd. Rahman Sabri, Harris; Rahim, Abd. Rahman Abdul; Yew, Wong Kuan; Ismail, Syuhaida

    2017-12-01

    Being the most demanding, challenging and exciting engineering and technological advances has provided escalated interests amongst the engineers at large to venture into the oil and gas (O&G) industry. Although claimed as the most expensive industry in the world via the utilisation of critical equipments, the O&G industry is still recording notorius failures in its project management especially due to turbomachinery issues, the heart equipment of any O&G project. Therefore, it is important for this paper to review turbomachinery project as one of the long lead items during project executions that is also proven to be the most costly and expensive equipment. This paper therefore discusses the gaps in turbomachinery studies via literature review in highlighting its application in O&G projects. It is found that the main components of turbomachinery are driver and driven equipment, which are applied for mechanical equipment, Electric Power Generation and heat generation for Combined Cycled Configuration. Important variables for turbomachinery selection include: (1) process requirement; (2) site location; (3) driver selection; (4) equipment sparing philosophy; (5) efficiency and reliability; (6) operability and maintainability; and (7) cost. It is hoped that this paper would lead to the successful project management of turbomachinery in the O&G industry.

  20. AEROSPACE NESHAP GUIDANCE: PAINTING AND DEPAINTING ALTERNATIVES FOR SELECTED DOD OPERATIONS

    EPA Science Inventory

    This project was sponsored by the DOD's Strategic Environmental Research and Development program (SERDP) and conducted by the EPA's Clean Processes and Products Branch at the NRMRL. In support of SERDP's objective of developing environmental solutions that improve mission readine...

  1. 78 FR 77549 - Revise Notice of Intent for an Environmental Impact Statement: State Route (SR) 95 Realignment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ...), intend to use a tiered process to facilitate project decision-making. This notice revises the NOI that... study. If the Record of Decision indicates that FHWA has selected one of the alternative corridors as...

  2. The Adverse Drug Reactions from Patient Reports in Social Media Project: Five Major Challenges to Overcome to Operationalize Analysis and Efficiently Support Pharmacovigilance Process.

    PubMed

    Bousquet, Cedric; Dahamna, Badisse; Guillemin-Lanne, Sylvie; Darmoni, Stefan J; Faviez, Carole; Huot, Charles; Katsahian, Sandrine; Leroux, Vincent; Pereira, Suzanne; Richard, Christophe; Schück, Stéphane; Souvignet, Julien; Lillo-Le Louët, Agnès; Texier, Nathalie

    2017-09-21

    Adverse drug reactions (ADRs) are an important cause of morbidity and mortality. Classical Pharmacovigilance process is limited by underreporting which justifies the current interest in new knowledge sources such as social media. The Adverse Drug Reactions from Patient Reports in Social Media (ADR-PRISM) project aims to extract ADRs reported by patients in these media. We identified 5 major challenges to overcome to operationalize the analysis of patient posts: (1) variable quality of information on social media, (2) guarantee of data privacy, (3) response to pharmacovigilance expert expectations, (4) identification of relevant information within Web pages, and (5) robust and evolutive architecture. This article aims to describe the current state of advancement of the ADR-PRISM project by focusing on the solutions we have chosen to address these 5 major challenges. In this article, we propose methods and describe the advancement of this project on several aspects: (1) a quality driven approach for selecting relevant social media for the extraction of knowledge on potential ADRs, (2) an assessment of ethical issues and French regulation for the analysis of data on social media, (3) an analysis of pharmacovigilance expert requirements when reviewing patient posts on the Internet, (4) an extraction method based on natural language processing, pattern based matching, and selection of relevant medical concepts in reference terminologies, and (5) specifications of a component-based architecture for the monitoring system. Considering the 5 major challenges, we (1) selected a set of 21 validated criteria for selecting social media to support the extraction of potential ADRs, (2) proposed solutions to guarantee data privacy of patients posting on Internet, (3) took into account pharmacovigilance expert requirements with use case diagrams and scenarios, (4) built domain-specific knowledge resources embeding a lexicon, morphological rules, context rules, semantic rules, syntactic rules, and post-analysis processing, and (5) proposed a component-based architecture that allows storage of big data and accessibility to third-party applications through Web services. We demonstrated the feasibility of implementing a component-based architecture that allows collection of patient posts on the Internet, near real-time processing of those posts including annotation, and storage in big data structures. In the next steps, we will evaluate the posts identified by the system in social media to clarify the interest and relevance of such approach to improve conventional pharmacovigilance processes based on spontaneous reporting. ©Cedric Bousquet, Badisse Dahamna, Sylvie Guillemin-Lanne, Stefan J Darmoni, Carole Faviez, Charles Huot, Sandrine Katsahian, Vincent Leroux, Suzanne Pereira, Christophe Richard, Stéphane Schück, Julien Souvignet, Agnès Lillo-Le Louët, Nathalie Texier. Originally published in JMIR Research Protocols (http://www.researchprotocols.org), 21.09.2017.

  3. Serial data acquisition for the X-ray plasma diagnostics with selected GEM detector structures

    NASA Astrophysics Data System (ADS)

    Czarski, T.; Chernyshova, M.; Pozniak, K. T.; Kasprowicz, G.; Zabolotny, W.; Kolasinski, P.; Krawczyk, R.; Wojenski, A.; Zienkiewicz, P.

    2015-10-01

    The measurement system based on GEM—Gas Electron Multiplier detector is developed for X-ray diagnostics of magnetic confinement tokamak plasmas. The paper is focused on the measurement subject and describes the fundamental data processing to obtain reliable characteristics (histograms) useful for physicists. The required data processing have two steps: 1—processing in the time domain, i.e. events selections for bunches of coinciding clusters, 2—processing in the planar space domain, i.e. cluster identification for the given detector structure. So, it is the software part of the project between the electronic hardware and physics applications. The whole project is original and it was developed by the paper authors. The previous version based on 1-D GEM detector was applied for the high-resolution X-ray crystal spectrometer KX1 in the JET tokamak. The current version considers 2-D detector structures for the new data acquisition system. The fast and accurate mode of data acquisition implemented in the hardware in real time can be applied for the dynamic plasma diagnostics. Several detector structures with single-pixel sensors and multi-pixel (directional) sensors are considered for two-dimensional X-ray imaging. Final data processing is presented by histograms for selected range of position, time interval and cluster charge values. Exemplary radiation source properties are measured by the basic cumulative characteristics: the cluster position distribution and cluster charge value distribution corresponding to the energy spectra. A shorter version of this contribution is due to be published in PoS at: 1st EPS conference on Plasma Diagnostics

  4. Technology transfer in New York City - The NASA/NYC Applications Project.

    NASA Technical Reports Server (NTRS)

    Karen, A.; Orrick, D.; Anuskiewicz, T.

    1973-01-01

    New York City faces many varied and complex problems ranging from truck hijacking to graffiti. In answer to a request from NYC officials NASA is sponsoring the efforts of a project aimed at applying aerospace-derived solutions to a series of city technical problems. An immediate result has been a pilot experiment to improve security in the City's schools. Other problem areas for NASA review have been selected from the Fire, Police and Air Resources Departments. The Project offers a significant example of a viable approach to the crucial process of bridging the communications gap between urban officials and technologists.

  5. High-throughput crystal-optimization strategies in the South Paris Yeast Structural Genomics Project: one size fits all?

    PubMed

    Leulliot, Nicolas; Trésaugues, Lionel; Bremang, Michael; Sorel, Isabelle; Ulryck, Nathalie; Graille, Marc; Aboulfath, Ilham; Poupon, Anne; Liger, Dominique; Quevillon-Cheruel, Sophie; Janin, Joël; van Tilbeurgh, Herman

    2005-06-01

    Crystallization has long been regarded as one of the major bottlenecks in high-throughput structural determination by X-ray crystallography. Structural genomics projects have addressed this issue by using robots to set up automated crystal screens using nanodrop technology. This has moved the bottleneck from obtaining the first crystal hit to obtaining diffraction-quality crystals, as crystal optimization is a notoriously slow process that is difficult to automatize. This article describes the high-throughput optimization strategies used in the Yeast Structural Genomics project, with selected successful examples.

  6. Olfactory Bulb Deep Short-Axon Cells Mediate Widespread Inhibition of Tufted Cell Apical Dendrites

    PubMed Central

    LaRocca, Greg

    2017-01-01

    In the main olfactory bulb (MOB), the first station of sensory processing in the olfactory system, GABAergic interneuron signaling shapes principal neuron activity to regulate olfaction. However, a lack of known selective markers for MOB interneurons has strongly impeded cell-type-selective investigation of interneuron function. Here, we identify the first selective marker of glomerular layer-projecting deep short-axon cells (GL-dSACs) and investigate systematically the structure, abundance, intrinsic physiology, feedforward sensory input, neuromodulation, synaptic output, and functional role of GL-dSACs in the mouse MOB circuit. GL-dSACs are located in the internal plexiform layer, where they integrate centrifugal cholinergic input with highly convergent feedforward sensory input. GL-dSAC axons arborize extensively across the glomerular layer to provide highly divergent yet selective output onto interneurons and principal tufted cells. GL-dSACs are thus capable of shifting the balance of principal tufted versus mitral cell activity across large expanses of the MOB in response to diverse sensory and top-down neuromodulatory input. SIGNIFICANCE STATEMENT The identification of cell-type-selective molecular markers has fostered tremendous insight into how distinct interneurons shape sensory processing and behavior. In the main olfactory bulb (MOB), inhibitory circuits regulate the activity of principal cells precisely to drive olfactory-guided behavior. However, selective markers for MOB interneurons remain largely unknown, limiting mechanistic understanding of olfaction. Here, we identify the first selective marker of a novel population of deep short-axon cell interneurons with superficial axonal projections to the sensory input layer of the MOB. Using this marker, together with immunohistochemistry, acute slice electrophysiology, and optogenetic circuit mapping, we reveal that this novel interneuron population integrates centrifugal cholinergic input with broadly tuned feedforward sensory input to modulate principal cell activity selectively. PMID:28003347

  7. Management of the Cs/Sr Capsule Project at the Hanford Site. Technology Readiness Assessment Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The Federal Project Director (FPD) for the U.S. Department of Energy (DOE), Richland Operations Office (RL) Waste Management and D&D Division (WMD) requested a Technology Readiness Assessment (TRA) for the Management of the Cesium/Strontium Capsule Storage Project (MCSCP) at the Waste Encapsulation and Storage Facility (WESF) on the Hanford Site in Washington State. The MCSCP CD-1 TRA was performed by a team selected in collaboration between the Office of Environmental Management (EM) Chief Engineer (EM-3.3) and RL, WMD FPD. The TRA Team included subject matter and technical experts having experience in cask storage, process engineering, and system design who weremore » independent of the MCSCP, and the team was led by the Director of Operations and Processes from the EM Chief Engineer's Office (EM-3.32). Movement of the Cs/Sr capsules to dry storage, based on information from the conceptual design, involves (1) capsule packaging, (2) capsule transfer, and (3) capsule storage. The project has developed a conceptual process, described in 30059-R-02, "NAC Conceptual Design Report for the Management of the Cesium and Strontium Capsules Project", which identifies the five major activities in the process to complete the transfer from storage pool to pad-mounted cask storage. The process, shown schematically in Figure 1, is comprised of the following process steps: (1) loading capsules into the UCS; (2) UCS processing; (3) UCS insertion into the TSC Basket; (4) cask transport from WESF to CSA and (5) extended storage at the CSA.« less

  8. Mental Status Documentation: Information Quality and Data Processes

    PubMed Central

    Weir, Charlene; Gibson, Bryan; Taft, Teresa; Slager, Stacey; Lewis, Lacey; Staggers, Nancy

    2016-01-01

    Delirium is a fluctuating disturbance of cognition and/or consciousness associated with poor outcomes. Caring for patients with delirium requires integration of disparate information across clinicians, settings and time. The goal of this project was to characterize the information processes involved in nurses’ assessment, documentation, decisionmaking and communication regarding patients’ mental status in the inpatient setting. VA nurse managers of medical wards (n=18) were systematically selected across the US. A semi-structured telephone interview focused on current assessment, documentation, and communication processes, as well as clinical and administrative decision-making was conducted, audio-recorded and transcribed. A thematic analytic approach was used. Five themes emerged: 1) Fuzzy Concepts, 2) Grey Data, 3) Process Variability 4) Context is Critical and 5) Goal Conflict. This project describes the vague and variable information processes related to delirium and mental status that undermine effective risk, prevention, identification, communication and mitigation of harm. PMID:28269919

  9. Mental Status Documentation: Information Quality and Data Processes.

    PubMed

    Weir, Charlene; Gibson, Bryan; Taft, Teresa; Slager, Stacey; Lewis, Lacey; Staggers, Nancy

    2016-01-01

    Delirium is a fluctuating disturbance of cognition and/or consciousness associated with poor outcomes. Caring for patients with delirium requires integration of disparate information across clinicians, settings and time. The goal of this project was to characterize the information processes involved in nurses' assessment, documentation, decisionmaking and communication regarding patients' mental status in the inpatient setting. VA nurse managers of medical wards (n=18) were systematically selected across the US. A semi-structured telephone interview focused on current assessment, documentation, and communication processes, as well as clinical and administrative decision-making was conducted, audio-recorded and transcribed. A thematic analytic approach was used. Five themes emerged: 1) Fuzzy Concepts, 2) Grey Data, 3) Process Variability 4) Context is Critical and 5) Goal Conflict. This project describes the vague and variable information processes related to delirium and mental status that undermine effective risk, prevention, identification, communication and mitigation of harm.

  10. Fast local reconstruction by selective backprojection for low dose in dental computed tomography

    NASA Astrophysics Data System (ADS)

    Yan, Bin; Deng, Lin; Han, Yu; Zhang, Feng; Wang, Xian-Chao; Li, Lei

    2014-10-01

    The high radiation dose in computed tomography (CT) scans increases the lifetime risk of cancer, which becomes a major clinical concern. The backprojection-filtration (BPF) algorithm could reduce the radiation dose by reconstructing the images from truncated data in a short scan. In a dental CT, it could reduce the radiation dose for the teeth by using the projection acquired in a short scan, and could avoid irradiation to the other part by using truncated projection. However, the limit of integration for backprojection varies per PI-line, resulting in low calculation efficiency and poor parallel performance. Recently, a tent BPF has been proposed to improve the calculation efficiency by rearranging the projection. However, the memory-consuming data rebinning process is included. Accordingly, the selective BPF (S-BPF) algorithm is proposed in this paper. In this algorithm, the derivative of the projection is backprojected to the points whose x coordinate is less than that of the source focal spot to obtain the differentiated backprojection. The finite Hilbert inverse is then applied to each PI-line segment. S-BPF avoids the influence of the variable limit of integration by selective backprojection without additional time cost or memory cost. The simulation experiment and the real experiment demonstrated the higher reconstruction efficiency of S-BPF.

  11. Space Tethers: Design Criteria

    NASA Technical Reports Server (NTRS)

    Tomlin, D. D.; Faile, G. C.; Hayashida, K. B.; Frost, C. L.; Wagner, C. Y.; Mitchell, M. L.; Vaughn, J. A.; Galuska, M. J.

    1997-01-01

    This document is prepared to provide a systematic process for the selection of tethers for space applications. Criteria arc provided for determining the strength requirement for tether missions and for mission success from tether severing due to micrometeoroids and orbital debris particle impacts. Background information of materials for use in space tethers is provided, including electricity-conducting tethers. Dynamic considerations for tether selection is also provided. Safety, quality, and reliability considerations are provided for a tether project.

  12. Implementation of MCA Method for Identification of Factors for Conceptual Cost Estimation of Residential Buildings

    NASA Astrophysics Data System (ADS)

    Juszczyk, Michał; Leśniak, Agnieszka; Zima, Krzysztof

    2013-06-01

    Conceptual cost estimation is important for construction projects. Either underestimation or overestimation of building raising cost may lead to failure of a project. In the paper authors present application of a multicriteria comparative analysis (MCA) in order to select factors influencing residential building raising cost. The aim of the analysis is to indicate key factors useful in conceptual cost estimation in the early design stage. Key factors are being investigated on basis of the elementary information about the function, form and structure of the building, and primary assumptions of technological and organizational solutions applied in construction process. The mentioned factors are considered as variables of the model which aim is to make possible conceptual cost estimation fast and with satisfying accuracy. The whole analysis included three steps: preliminary research, choice of a set of potential variables and reduction of this set to select the final set of variables. Multicriteria comparative analysis is applied in problem solution. Performed analysis allowed to select group of factors, defined well enough at the conceptual stage of the design process, to be used as a describing variables of the model.

  13. Biomass-derived Syngas Utilization for Fuels and Chemicals - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dayton, David C

    2010-03-24

    Executive Summary The growing gap between petroleum production and demand, mounting environmental concerns, and increasing fuel prices have stimulated intense interest in research and development (R&D) of alternative fuels, both synthetic and bio-derived. Currently, the most technically defined thermochemical route for producing alternative fuels from lignocellulosic biomass involves gasification/reforming of biomass to produce syngas (carbon monoxide [CO] + hydrogen [H2]), followed by syngas cleaning, Fischer-Tropsch synthesis (FTS) or mixed alcohol synthesis, and some product upgrading via hydroprocessing or separation. A detailed techno-economic analysis of this type of process has recently been published [1] and it highlights the need for technicalmore » breakthroughs and technology demonstration for gas cleanup and fuel synthesis. The latter two technical barrier areas contribute 40% of the total thermochemical ethanol cost and 70% of the production cost, if feedstock costs are factored out. Developing and validating technologies that reduce the capital and operating costs of these unit operations will greatly reduce the risk for commercializing integrated biomass gasification/fuel synthesis processes for biofuel production. The objective of this project is to develop and demonstrate new catalysts and catalytic processes that can efficiently convert biomass-derived syngas into diesel fuel and C2-C4 alcohols. The goal is to improve the economics of the processes by improving the catalytic activity and product selectivity, which could lead to commercialization. The project was divided into 4 tasks: Task 1: Reactor Systems: Construction of three reactor systems was a project milestone. Construction of a fixed-bed microreactor (FBR), a continuous stirred tank reactor (CSTR), and a slurry bubble column reactor (SBCR) were completed to meet this milestone. Task 2: Iron Fischer-Tropsch (FT) Catalyst: An attrition resistant iron FT catalyst will be developed and tested. Task 3: Chemical Synthesis: Promising process routes will be identified for synthesis of selected chemicals from biomass-derived syngas. A project milestone was to select promising mixed alcohol catalysts and screen productivity and performance in a fixed bed micro-reactor using bottled syngas. This milestone was successfully completed in collaboration withour catalyst development partner. Task 4: Modeling, Engineering Evaluation, and Commercial Assessment: Mass and energy balances of conceptual commercial embodiment for FT and chemical synthesis were completed.« less

  14. NASA Standing Review Board Handbook: Revision B

    NASA Technical Reports Server (NTRS)

    Amer, Tahani R.; Ortiz, James N.; Calloway, Michelle A.; Greathouse, Richard M.; Polen, Charles A.; Baker, Ronald L.; Borchardt, Heidemarie E.; Chromik, Christopher C.; Moran, Erin; Paraska, Michael W.; hide

    2016-01-01

    This SRB Handbook provides review guidance for the program and project communities and for the SRBs regarding the expectations, processes, products, timelines, and working interfaces with review organizations, Centers, Mission Directorates, Mission Support Organizations, and Management Councils. It provides guidelines for membership selection, review implementation, review products, and reporting of results. The SRB Handbook guidance may be tailored, with the Convening Authorities' approval, to meet the needs of the Agency, Mission Directorates, Centers, and the programs and projects being reviewed. The final review agreement of the SRB, program and project, and Convening Authorities for program and project Life-Cycle Reviews (LCRs) is documented in the terms of reference, as described in Section 4.1 and Appendix H.

  15. 50 CFR 84.30 - How are projects selected for grants?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM NATIONAL COASTAL WETLANDS CONSERVATION GRANT PROGRAM Project Selection § 84.30 How are projects selected for grants? Project selection is...) Provides public conservation benefits that are cost effective and long-term, i.e., at least 20 years; and...

  16. Closure development for high-level nuclear waste containers for the tuff repository; Phase 1, Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robitz, E.S. Jr.; McAninch, M.D. Jr.; Edmonds, D.P.

    1990-09-01

    This report summarizes Phase 1 activities for closure development of the high-level nuclear waste package task for the tuff repository. Work was conducted under U.S. Department of Energy (DOE) Contract 9172105, administered through the Lawrence Livermore National Laboratory (LLNL), as part of the Yucca Mountain Project (YMP), funded through the DOE Office of Civilian Radioactive Waste Management (OCRWM). The goal of this phase was to select five closure processes for further evaluation in later phases of the program. A decision tree methodology was utilized to perform an objective evaluation of 15 potential closure processes. Information was gathered via a literaturemore » survey, industrial contacts, and discussions with project team members, other experts in the field, and the LLNL waste package task staff. The five processes selected were friction welding, electron beam welding, laser beam welding, gas tungsten arc welding, and plasma arc welding. These are felt to represent the best combination of weldment material properties and process performance in a remote, radioactive environment. Conceptual designs have been generated for these processes to illustrate how they would be implemented in practice. Homopolar resistance welding was included in the Phase 1 analysis, and developments in this process will be monitored via literature in Phases 2 and 3. Work was conducted in accordance with the YMP Quality Assurance Program. 223 refs., 20 figs., 9 tabs.« less

  17. 7 CFR 1780.17 - Selection priorities and process.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) Projects that primarily recycle solid waste products thereby limiting the need for solid waste disposal—5..., DEPARTMENT OF AGRICULTURE (CONTINUED) WATER AND WASTE LOANS AND GRANTS General Policies and Requirements... solid waste violations—15 points. (c) Median household income priorities. The median household income of...

  18. 7 CFR 1780.17 - Selection priorities and process.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) Projects that primarily recycle solid waste products thereby limiting the need for solid waste disposal—5..., DEPARTMENT OF AGRICULTURE (CONTINUED) WATER AND WASTE LOANS AND GRANTS General Policies and Requirements... solid waste violations—15 points. (c) Median household income priorities. The median household income of...

  19. 7 CFR 1780.17 - Selection priorities and process.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) Projects that primarily recycle solid waste products thereby limiting the need for solid waste disposal—5..., DEPARTMENT OF AGRICULTURE (CONTINUED) WATER AND WASTE LOANS AND GRANTS General Policies and Requirements... solid waste violations—15 points. (c) Median household income priorities. The median household income of...

  20. Lease-Purchase Program Applicant Handbook.

    ERIC Educational Resources Information Center

    California State Dept. of General Services, Sacramento. Office of Public School Construction.

    This manual guides applicants through the process of acquiring and managing California state funds for public school facility construction projects. Section 1 focuses on determining eligibility and on preparing application packages for Phase P approval and/or apportionment. Section 2 examines regulations and required forms for selecting school…

  1. An Elective Course in Separation Processes.

    ERIC Educational Resources Information Center

    Wankat, Phillip C.

    1981-01-01

    Reviews an elective course designed to incorporate: (1) study of operating methods for adsorption, chromatography, and ion exchange in a pattern set by the instructor; (2) study of student selected topics with instructor developed lectures and assignments; and (3) course project done by each student. (SK)

  2. Introducing practice-based learning and improvement ACGME core competencies into a family medicine residency curriculum.

    PubMed

    Coleman, Mary Thoesen; Nasraty, Soraya; Ostapchuk, Michael; Wheeler, Stephen; Looney, Stephen; Rhodes, Sandra

    2003-05-01

    The Accreditation Council for Graduate Medical Education (ACGME) recommends integrating improvement activities into residency training. A curricular change was designed at the Department of Family and Community Medicine, University of Louisville, to address selected ACGME competencies by incorporating practice-based improvement activities into the routine clinical work of family medicine residents. Teams of residents, faculty, and office staff completed clinical improvement projects at three ambulatory care training sites. Residents were given academic credit for participation in team meetings. After 6 months, residents presented results to faculty, medical students, other residents, and staff from all three training sites. Residents, staff, and faculty were recognized for their participation. Resident teams demonstrated ACGME competencies in practice-based improvement: Chart audits indicated improvement in clinical projects; quality improvement tools demonstrated analysis of root causes and understanding of the process; plan-do-study-act cycle worksheets demonstrated the change process. Improvement activities that affect patient care and demonstrate selected ACGME competencies can be successfully incorporated into the daily work of family medicine residents.

  3. Second Generation Crop Yield Models Review

    NASA Technical Reports Server (NTRS)

    Hodges, T. (Principal Investigator)

    1982-01-01

    Second generation yield models, including crop growth simulation models and plant process models, may be suitable for large area crop yield forecasting in the yield model development project. Subjective and objective criteria for model selection are defined and models which might be selected are reviewed. Models may be selected to provide submodels as input to other models; for further development and testing; or for immediate testing as forecasting tools. A plant process model may range in complexity from several dozen submodels simulating (1) energy, carbohydrates, and minerals; (2) change in biomass of various organs; and (3) initiation and development of plant organs, to a few submodels simulating key physiological processes. The most complex models cannot be used directly in large area forecasting but may provide submodels which can be simplified for inclusion into simpler plant process models. Both published and unpublished models which may be used for development or testing are reviewed. Several other models, currently under development, may become available at a later date.

  4. 14. Implementation, execution, and completion of projects.

    PubMed

    2014-05-01

    Once an intervention has been selected for implementation, it becomes a project. Implementation of a project is a complex process and requires completion of a host of tasks. The implementation process has been deconstructed into its components so that it can be analysed and evaluated. A prerequisite for implementation is an operational plan. The tasks that require completion include: (1) reassessing current status and verifying the needs; (2) activating the operational plan; (3) setting-up and operating an administrative structure; (4) identifying, acquiring, and organising resources (including human resources); (5) assigning roles and responsibilities; (6) educating and training personnel (including mission-specific); (7) briefing staff; (8) preparing/readying resources for transport; (9) assuring project self-sufficiency; (10) arranging for personal necessities; (11) ensuring the safety of personnel and the security of equipment and supplies; (12) insuring personnel; (13) coordinating with other projects/actors; (14) coordinating with other BSF systems (role of the coordination and control centre); (15) communicating with community leaders; (16) initiating the use of standardised progress reports; (17) deploying personnel, equipment, and supplies; (18) initiating the intervention(s); (19) executing the intervention(s); (20) reporting start of interventions; (21) completing the project; and (22) completing and submitting a formal report. This deconstruction is essential in order to study the process and identify critical points of success and failure. It also is recognised that many interventions consist of many components (subfunctions), each of which may be considered a production process.

  5. Using guided inquiry and the information search process to develop research confidence among first year anatomy students.

    PubMed

    Bentley, Danielle Christine; Robinson, Andrea Cristina; Ruscitti, Robert Joseph

    2015-01-01

    With the growing volume of obtainable medical information and scientific literature, it is crucial that students in the field of allied health professions develop and refine the research skill set necessary to effectively find, retrieve, analyze, and use this information. This skill set can be effectively developed using student inquiry; an active learning process where students answer questions using research and data analysis. Therefore, with the pedagogical goal of developing information literacy among a cohort of allied health professional trainees, first year students studying human anatomy completed inquiry-based projects that were structured within the framework of the Information Search Process. This article thoroughly describes the conceptualization, creation, improvement, implementation, and assessment of the projects beginning with version one, the Student Inquiry Projects. Following a pilot of the Student Inquiry Projects various evidence-based improvements resulted in the final project version called the Inquiry Guided Learning Projects (IGLPs). A full assessment of the IGLPs revealed that students' self-perceived confidence improved for all tested research skills including: research question development, research question selection, exploration of peer-review literature, acquisition of resources, effective communication of results, and literature citation (all P < 0.05). Furthermore, six months following project completion students retained improved confidence in research question development and effective communication of results, with 90% of students indicating the IGLPs were directly responsible for these improvements. By guiding students through the Information Search Process, the IGLPs successfully developed research confidence among allied health trainees. © 2015 American Association of Anatomists.

  6. Process and technoeconomic analysis of leading pretreatment technologies for lignocellulosic ethanol production using switchgrass.

    PubMed

    Tao, Ling; Aden, Andy; Elander, Richard T; Pallapolu, Venkata Ramesh; Lee, Y Y; Garlock, Rebecca J; Balan, Venkatesh; Dale, Bruce E; Kim, Youngmi; Mosier, Nathan S; Ladisch, Michael R; Falls, Matthew; Holtzapple, Mark T; Sierra, Rocio; Shi, Jian; Ebrik, Mirvat A; Redmond, Tim; Yang, Bin; Wyman, Charles E; Hames, Bonnie; Thomas, Steve; Warner, Ryan E

    2011-12-01

    Six biomass pretreatment processes to convert switchgrass to fermentable sugars and ultimately to cellulosic ethanol are compared on a consistent basis in this technoeconomic analysis. The six pretreatment processes are ammonia fiber expansion (AFEX), dilute acid (DA), lime, liquid hot water (LHW), soaking in aqueous ammonia (SAA), and sulfur dioxide-impregnated steam explosion (SO(2)). Each pretreatment process is modeled in the framework of an existing biochemical design model so that systematic variations of process-related changes are consistently captured. The pretreatment area process design and simulation are based on the research data generated within the Biomass Refining Consortium for Applied Fundamentals and Innovation (CAFI) 3 project. Overall ethanol production, total capital investment, and minimum ethanol selling price (MESP) are reported along with selected sensitivity analysis. The results show limited differentiation between the projected economic performances of the pretreatment options, except for processes that exhibit significantly lower monomer sugar and resulting ethanol yields. Copyright © 2011 Elsevier Ltd. All rights reserved.

  7. A quantitative analysis of biodiversity and the recreational value of potential national parks in Denmark.

    PubMed

    Larsen, Frank Wugt; Petersen, Anders Højgård; Strange, Niels; Lund, Mette Palitzsch; Rahbek, Carsten

    2008-05-01

    Denmark has committed itself to the European 2010 target to halt the loss of biodiversity. Currently, Denmark is in the process of designating larger areas as national parks, and 7 areas (of a possible 32 larger nature areas) have been selected for pilot projects to test the feasibility of establishing national parks. In this article, we first evaluate the effectiveness of the a priori network of national parks proposed through expert and political consensus versus a network chosen specifically for biodiversity through quantitative analysis. Second, we analyze the potential synergy between preserving biodiversity in terms of species representation and recreational values in selecting a network of national parks. We use the actual distribution of 973 species within these 32 areas and 4 quantitative measures of recreational value. Our results show that the 7 pilot project areas are not significantly more effective in representing species than expected by chance and that considerably more efficient networks can be selected. Moreover, it is possible to select more-effective networks of areas that combine high representation of species with high ranking in terms of recreational values. Therefore, our findings suggest possible synergies between outdoor recreation and biodiversity conservation when selecting networks of national parks. Overall, this Danish case illustrates that data-driven analysis can not only provide valuable information to guide the decision-making process of designating national parks, but it can also be a means to identify solutions that simultaneously fulfill several goals (biodiversity preservation and recreational values).

  8. Development of a Novel Gas Pressurized Stripping Process-Based Technology for CO₂ Capture from Post-Combustion Flue Gases

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, Shiaoguo

    A novel Gas Pressurized Stripping (GPS) post-combustion carbon capture (PCC) process has been developed by Carbon Capture Scientific, LLC, CONSOL Energy Inc., Nexant Inc., and Western Kentucky University in this bench-scale project. The GPS-based process presents a unique approach that uses a gas pressurized technology for CO₂ stripping at an elevated pressure to overcome the energy use and other disadvantages associated with the benchmark monoethanolamine (MEA) process. The project was aimed at performing laboratory- and bench-scale experiments to prove its technical feasibility and generate process engineering and scale-up data, and conducting a techno-economic analysis (TEA) to demonstrate its energy usemore » and cost competitiveness over the MEA process. To meet project goals and objectives, a combination of experimental work, process simulation, and technical and economic analysis studies were applied. The project conducted individual unit lab-scale tests for major process components, including a first absorption column, a GPS column, a second absorption column, and a flasher. Computer simulations were carried out to study the GPS column behavior under different operating conditions, to optimize the column design and operation, and to optimize the GPS process for an existing and a new power plant. The vapor-liquid equilibrium data under high loading and high temperature for the selected amines were also measured. The thermal and oxidative stability of the selected solvents were also tested experimentally and presented. A bench-scale column-based unit capable of achieving at least 90% CO₂ capture from a nominal 500 SLPM coal-derived flue gas slipstream was designed and built. This integrated, continuous, skid-mounted GPS system was tested using real flue gas from a coal-fired boiler at the National Carbon Capture Center (NCCC). The technical challenges of the GPS technology in stability, corrosion, and foaming of selected solvents, and environmental, health and safety risks have been addressed through experimental tests, consultation with vendors and engineering analysis. Multiple rounds of TEA were performed to improve the GPS-based PCC process design and operation, and to compare the energy use and cost performance of a nominal 550-MWe supercritical pulverized coal (PC) plant among the DOE/NETL report Case 11 (the PC plant without CO₂ capture), the DOE/NETL report Case 12 (the PC plant with benchmark MEA-based PCC), and the PC plant using GPS-based PCC. The results reveal that the net power produced in the PC plant with GPS-based PCC is 647 MWe, greater than that of the Case 12 (550 MWe). The 20-year LCOE for the PC plant with GPS-based PCC is 97.4 mills/kWh, or 152% of that of the Case 11, which is also 23% less than that of the Case 12. These results demonstrate that the GPS-based PCC process is energy-efficient and cost-effective compared with the benchmark MEA process.« less

  9. Evaluation of 1983 selective speed enforcement projects in Virginia.

    DOT National Transportation Integrated Search

    1985-01-01

    This report describes and evaluates Virginia's 1983 selective speed enforcement projects. These projects are one of the various types of highway safety programs, classified as selective traffic enforcement projects (STEPs) partially funded by the fed...

  10. Use of Thermodynamic Modeling for Selection of Electrolyte for Electrorefining of Magnesium from Aluminum Alloy Melts

    NASA Astrophysics Data System (ADS)

    Gesing, Adam J.; Das, Subodh K.

    2017-02-01

    With United States Department of Energy Advanced Research Project Agency funding, experimental proof-of-concept was demonstrated for RE-12TM electrorefining process of extraction of desired amount of Mg from recycled scrap secondary Al molten alloys. The key enabling technology for this process was the selection of the suitable electrolyte composition and operating temperature. The selection was made using the FactSage thermodynamic modeling software and the light metal, molten salt, and oxide thermodynamic databases. Modeling allowed prediction of the chemical equilibria, impurity contents in both anode and cathode products, and in the electrolyte. FactSage also provided data on the physical properties of the electrolyte and the molten metal phases including electrical conductivity and density of the molten phases. Further modeling permitted selection of electrode and cell construction materials chemically compatible with the combination of molten metals and the electrolyte.

  11. Evaluation of the physical process controlling beach changes adjacent to nearshore dredge pits

    USGS Publications Warehouse

    Benedet, L.; List, J.H.

    2008-01-01

    Numerical modeling of a beach nourishment project is conducted to enable a detailed evaluation of the processes associated with the effects of nearshore dredge pits on nourishment evolution and formation of erosion hot spots. A process-based numerical model, Delft3D, is used for this purpose. The analysis is based on the modification of existing bathymetry to simulate "what if" scenarios with/without the bathymetric features of interest. Borrow pits dredged about 30??years ago to provide sand for the nourishment project have a significant influence on project performance and formation of erosional hot spots. It was found that the main processes controlling beach response to these offshore bathymetric features were feedbacks between wave forces (roller force or alongshore component of the radiation stress), pressure gradients due to differentials in wave set-up/set-down and bed shear stress. Modeling results also indicated that backfilling of selected borrow sites showed a net positive effect within the beach fill limits and caused a reduction in the magnitude of hot spot erosion. ?? 2008 Elsevier B.V. All rights reserved.

  12. Space processing applications rocket project. SPAR 8

    NASA Technical Reports Server (NTRS)

    Chassay, R. P. (Editor)

    1984-01-01

    The Space Processing Applications Rocket Project (SPAR) VIII Final Report contains the engineering report prepared at the Marshall Space Flight Center (MSFC) as well as the three reports from the principal investigators. These reports also describe pertinent portions of ground-based research leading to the ultimate selection of the flight sample composition, including design, fabrication, and testing, all of which are expected to contribute immeasurably to an improved comprehension of materials processing in space. This technical memorandum is directed entirely to the payload manifest flown in the eighth of a series of SPAR flights conducted at the White Sands Missile Range (WSMR) and includes the experiments entitled Glass Formation Experiment SPAR 74-42/1R, Glass Fining Experiment in Low-Gravity SPAR 77-13/1, and Dynamics of Liquid Bubbles SPAR Experiment 77-18/2.

  13. Using project life-cycles as guide for timing the archival of scientific data and supporting documentation

    NASA Astrophysics Data System (ADS)

    Martinez, E.; Glassy, J. M.; Fowler, D. K.; Khayat, M.; Olding, S. W.

    2014-12-01

    The NASA Earth Science Data Systems Working Groups (ESDSWG) focuses on improving technologies and processes related to science discovery and preservation. One particular group, the Data Preservation Practices, is defining a set of guidelines to aid data providers in planning both what to submit for archival, and when to submit artifacts, so that the archival process can begin early in the project's life cycle. This has the benefit of leveraging knowledge within the project before staff roll off to other work. In this poster we describe various project archival use cases and identify possible archival life cycles that map closely to the pace and flow of work. To understand "archival life cycles", i.e., distinct project phases that produce archival artifacts such as instrument capabilities, calibration reports, and science data products, the workig group initially mapped the archival requirements defined in the Preservation Content Specification to the typical NASA project life cycle. As described in the poster, this work resulted in a well-defined archival life cycle, but only for some types of projects; it did not fit well for condensed project life cycles experienced within airborne and balloon campaigns. To understand the archival process for projects with compressed cycles, the working group gathered use cases from various communities. This poster will describe selected uses cases that provided insight into the unique flow of these projects, as well as proposing archival life cycles that map artifacts to projects with compressed timelines. Finally, the poster will conclude with some early recommendations for data providers, which will be captured in a formal Guidelines document - to be published in 2015.

  14. Valued ecosystem components for watershed cumulative effects: an analysis of environmental impact assessments in the South Saskatchewan River watershed, Canada.

    PubMed

    Ball, Murray A; Noble, Bram F; Dubé, Monique G

    2013-07-01

    The accumulating effects of human development are threatening water quality and availability. In recognition of the constraints to cumulative effects assessment (CEA) under traditional environmental impact assessment (EIA), there is an emerging body of research dedicated to watershed-based cumulative effects assessment (WCEA). To advance the science of WCEA, however, a standard set of ecosystem components and indicators is required that can be used at the watershed scale, to inform effects-based understanding of cumulative change, and at the project scale, to inform regulatory-based project based impact assessment and mitigation. A major challenge, however, is that it is not clear how such ecosystem components and indicators for WCEA can or should be developed. This study examined the use of aquatic ecosystem components and indicators in EIA practice in the South Saskatchewan River watershed, Canada, to determine whether current practice at the project scale could be "scaled up" to support ecosystem component and indicator development for WCEA. The hierarchy of assessment components and indicators used in a sample of 35 environmental impact assessments was examined and the factors affecting aquatic ecosystem component selection and indicator use were identified. Results showed that public environmental impact statements are not necessarily publically accessible, thus limiting opportunities for data and information sharing from the project to the watershed scale. We also found no consistent terminology across the sample of impact statements, thus making comparison of assessment processes and results difficult. Regulatory compliance was found to be the dominant factor influencing the selection of ecosystem components and indicators for use in project assessment, rather than scientific reasoning, followed by the mandate of the responsible government agency for the assessment, public input to the assessment process, and preexisting water licensing arrangements external to the assessment process. The current approach to project-based assessment offered little support for WCEA initiatives. It did not provide a standard set of aquatic ecosystem components and indicators or allow the sharing of information across projects and from the project to the watershed scale. We suggest that determining priority assessment parameters for WCEA requires adoption of a standardized framework of component and indicator terminology, which can then be populated for the watershed of concern based on both watershed-based priorities and project-specific regulatory requirements. Copyright © 2012 SETAC.

  15. Characterising and improving the performance of the Sentinel-3 SRAL altimeter: A Report from SCOOP, SHAPE & SPICE Projects

    NASA Astrophysics Data System (ADS)

    Restano, Marco; Ambrózio, Américo; Cotton, David; Scoop Team; Fabry, Pierre; Shape Team; McMillan, Malcolm; Spice Team; Benveniste, Jérôme

    2017-04-01

    Under the ESA Scientific Exploitation of Operational Missions (SEOM) Programme, 3 Projects are currently underway to accurately characterise and improve the performance of the Sentinel-3 SRAL SAR mode altimeter. They are: 1) SCOOP (SAR Altimetry Coastal & Open Ocean Performance Exploitation and Roadmap Study) for Coastal and Open Ocean; 2) SHAPE (Sentinel-3 Hydrologic Altimetry PrototypE) for Inland Water; 3) SPICE (Sentinel-3 Performance improvement for ICE sheets) for Ice Sheets. As projects started before the launch of Sentinel-3 (a full SAR mission), calibrated Cryosat-2 data have been used as input to a processor replicating the Sentinel-3 baseline processing. For the SCOOP project, a first test dataset has been released to end users including data from 10 regions of interest. The successful SAMOSA retracker, adopted in the previous CP4O Project (CryoSat Plus for Oceans), has been readapted to re-track Sentinel-3 waveforms. An improved version of SAMOSA will be released at the end of the project. The SHAPE project is working towards the design and assessment of alternative/innovative techniques not implemented in the Sentinel-3 ground segment (performing no Inland Water dedicated processing). Both rivers and lakes will be studied. Amazon, Brahmaputra and Danube have been selected as rivers, whereas Titicaca and Vanern have been chosen as lakes. The study will include the assimilation of output products into hydrological models for all regions of interest. A final dataset will be provided to end users. The SPICE project is addressing four high level objectives: 1) Assess and improve the Delay-Doppler altimeter processing for ice sheets. 2) Assess and develop SAR waveform retrackers for ice sheets. 3) Evaluate the performance of SAR altimetry relative to conventional pulse limited altimetry. 4) Assess the impact on SAR altimeter measurements of radar wave interaction with the snowpack. Dataset used for validation include ICESat and IceBridge products. Vostok, Dome C and the Spirit Sector (all located in Antarctica) have been selected, along with the Russell Glacier in Greenland, as regions of interest. In the frame of both SCOOP and SHAPE projects, improved wet troposphere corrections will be estimated for all regions of interest.

  16. Tuning Higher Education

    NASA Astrophysics Data System (ADS)

    Carroll, Bradley

    2011-03-01

    In April 2009, the Lumina Foundation launched its Tuning USA project. Faculty teams in selected disciplines from Indiana, Minnesota, and Utah started pilot Tuning programs at their home institutions. Using Europe's Bologna Process as a guide, Utah physicists worked to reach a consensus about the knowledge and skills that should characterize the 2-year, batchelor's, and master's degree levels. I will share my experience as a member of Utah's physics Tuning team, and describe our progress, frustrations, and evolving understanding of the Tuning project's history, methods, and goals.

  17. 7 CFR 1485.14 - Application review and formation of agreements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... passwords in accordance with USDA's information technology policies that CCC will provide to MAP... markets for U.S. agricultural commodities. The selection process, by its nature, involves the exercise of judgment. CCC's choice of Participants and proposed promotion projects requires that it consider and weigh...

  18. 7 CFR 1485.14 - Application review and formation of agreements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... passwords in accordance with USDA's information technology policies that CCC will provide to MAP... markets for U.S. agricultural commodities. The selection process, by its nature, involves the exercise of judgment. CCC's choice of Participants and proposed promotion projects requires that it consider and weigh...

  19. 76 FR 28925 - Tribal Veterans Cemetery Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-19

    ... means the process of site selection, land acquisition, design and planning, earth moving, landscaping... space, or functional layout; and it will not enter into a construction contract for the project or... State or Tribal Organization and the design team to provide a standard for preparation of drawings...

  20. Process to Product.

    ERIC Educational Resources Information Center

    Harrison, Gary, Ed.; Mirkes, Donna Z., Ed.

    Intended for educators who direct federally funded model projects, the booklet provides a framework for special education product development. In "Making Media Decisions," G. Richman explores procedures for selecting the most appropriate medium to carry the message of a given product. The fundamental questions are addressed: what is the goal; who…

  1. Finding a Place for Health in the Schooling Process: A Challenge for Education.

    ERIC Educational Resources Information Center

    Ridge, Damien; Northfield, Jeff; St. Leger, Lawrence; Marshall, Bernie; Sheehan, Margaret; Maher, Shelley

    2002-01-01

    Evaluated outcomes in selected Australian schools of an intervention project, Health Promoting Schools (promoted by the World Health Organization). Found that studied schools moved beyond oppositional constructions of health and education towards approaching health as an element of effective schooling. (EV)

  2. Hierarchical analysis of bridge decision makers : the role of new technology adoption in the timber bridge market : special project fiscal year 1992

    DOT National Transportation Integrated Search

    1995-08-01

    Bridge design engineers and local highway officials make bridge replacement decisions across the : United States. The Analytical Hierarchy Process was used to characterize the bridge material selection : decision of these individuals. State Departmen...

  3. 77 FR 21778 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ... the integrity of ACF's award selection process. All ACF discretionary grant programs are required to... Standard Form 424 series, which requests basic information, budget information, and assurances; the Project... Administration for Children and Families, Office of Planning, Research and Evaluation, 370 L'Enfant Promenade SW...

  4. Hierarchical auditory processing directed rostrally along the monkey's supratemporal plane.

    PubMed

    Kikuchi, Yukiko; Horwitz, Barry; Mishkin, Mortimer

    2010-09-29

    Connectional anatomical evidence suggests that the auditory core, containing the tonotopic areas A1, R, and RT, constitutes the first stage of auditory cortical processing, with feedforward projections from core outward, first to the surrounding auditory belt and then to the parabelt. Connectional evidence also raises the possibility that the core itself is serially organized, with feedforward projections from A1 to R and with additional projections, although of unknown feed direction, from R to RT. We hypothesized that area RT together with more rostral parts of the supratemporal plane (rSTP) form the anterior extension of a rostrally directed stimulus quality processing stream originating in the auditory core area A1. Here, we analyzed auditory responses of single neurons in three different sectors distributed caudorostrally along the supratemporal plane (STP): sector I, mainly area A1; sector II, mainly area RT; and sector III, principally RTp (the rostrotemporal polar area), including cortex located 3 mm from the temporal tip. Mean onset latency of excitation responses and stimulus selectivity to monkey calls and other sounds, both simple and complex, increased progressively from sector I to III. Also, whereas cells in sector I responded with significantly higher firing rates to the "other" sounds than to monkey calls, those in sectors II and III responded at the same rate to both stimulus types. The pattern of results supports the proposal that the STP contains a rostrally directed, hierarchically organized auditory processing stream, with gradually increasing stimulus selectivity, and that this stream extends from the primary auditory area to the temporal pole.

  5. Cultivation of students' engineering designing ability based on optoelectronic system course project

    NASA Astrophysics Data System (ADS)

    Cao, Danhua; Wu, Yubin; Li, Jingping

    2017-08-01

    We carry out teaching based on optoelectronic related course group, aiming at junior students majored in Optoelectronic Information Science and Engineering. " Optoelectronic System Course Project " is product-designing-oriented and lasts for a whole semester. It provides a chance for students to experience the whole process of product designing, and improve their abilities to search literature, proof schemes, design and implement their schemes. In teaching process, each project topic is carefully selected and repeatedly refined to guarantee the projects with the knowledge integrity, engineering meanings and enjoyment. Moreover, we set up a top team with professional and experienced teachers, and build up learning community. Meanwhile, the communication between students and teachers as well as the interaction among students are taken seriously in order to improve their team-work ability and communicational skills. Therefore, students are not only able to have a chance to review the knowledge hierarchy of optics, electronics, and computer sciences, but also are able to improve their engineering mindset and innovation consciousness.

  6. Development of the Oxford Hills Healthy Moms Project using a social marketing process: a community-based physical activity and nutrition intervention for low-socioeconomic-status mothers in a rural area in Maine.

    PubMed

    Dharod, Jigna M; Drewette-Card, Rebecca; Crawford, David

    2011-03-01

    A physical activity and nutrition community intervention called the Oxford Hills Healthy Moms (OHHM) Project was developed using a multifaceted social marketing process, including review of state surveillance results, key informant interviews, and a survey and focus group discussions with low-socioeconomic-status (low-SES) mothers. This formative work was used to make key decisions on the selection of the intervention region, segmentation of the audience, and design of intervention strategies addressing multiple levels of the socioecological model. The OHHM Project aims to increase fruit and vegetable consumption and physical activity levels among low-SES mothers in the Oxford Hills region of Maine. The OHHM Project includes five components: (a) physical activity buddy program, (b) cooking club with education, (c) fruit and vegetable discount buying club with education, (d) increased access to produce vendors, and (e) increased access to places for physical activity.

  7. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  8. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  9. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  10. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  11. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  12. HOLE-BLOCKING LAYERS FOR SILICON/ORGANIC HETEROJUNCTIONS: A NEW CLASS OF HIGH-EFFICIENCY LOW-COST PV

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sturm, James

    This project is the first investigation of the use of thin titanium dioxide layers on silicon as a hole-blocking / electron-transparent selective contact to silicon. The work was motivated by the goal of a high-efficiency low-cost silicon-based solar cells that could be processed entirely at low temperature (300 Degree Celsius) or less, without requiring plasma-processing.

  13. Information Memory Processing and Retrieval: Relationships of the Intellect with the Processing of a Learning and Cognition Task.

    ERIC Educational Resources Information Center

    Moser, Gene W.

    Reported is one of a series of investigations of the Project on an Information Memory Model. This study was done to test an information memory model for identifying the unit of information structure involved in task cognitions by humans. Four groups of 30 randomly selected subjects (ages 7, 9, 11 and 15 years) performed a sorting task of 14…

  14. Studies of the use of heat from high temperature nuclear sources for hydrogen production processes

    NASA Technical Reports Server (NTRS)

    Farbman, G. H.

    1976-01-01

    Future uses of hydrogen and hydrogen production processes that can meet the demand for hydrogen in the coming decades were considered. To do this, a projection was made of the market for hydrogen through the year 2000. Four hydrogen production processes were selected, from among water electrolysis, fossil based and thermochemical water decomposition systems, and evaluated, using a consistent set of ground rules, in terms of relative performance, economics, resource requirements, and technology status.

  15. Use of Process Improvement Tools in Radiology.

    PubMed

    Rawson, James V; Kannan, Amogha; Furman, Melissa

    2016-01-01

    Process improvement techniques are common in manufacturing and industry. Over the past few decades these principles have been slowly introduced in select health care settings. This article reviews the Plan, Do, Study, and Act cycle, Six Sigma, the System of Profound Knowledge, Lean, and the theory of constraints. Specific process improvement tools in health care and radiology are presented in the order the radiologist is likely to encounter them in an improvement project. Copyright © 2015 Mosby, Inc. All rights reserved.

  16. Human Factors Engineering as a System in the Vision for Exploration

    NASA Technical Reports Server (NTRS)

    Whitmore, Mihriban; Smith, Danielle; Holden, Kritina

    2006-01-01

    In order to accomplish NASA's Vision for Exploration, while assuring crew safety and productivity, human performance issues must be well integrated into system design from mission conception. To that end, a two-year Technology Development Project (TDP) was funded by NASA Headquarters to develop a systematic method for including the human as a system in NASA's Vision for Exploration. The specific goals of this project are to review current Human Systems Integration (HSI) standards (i.e., industry, military, NASA) and tailor them to selected NASA Exploration activities. Once the methods are proven in the selected domains, a plan will be developed to expand the effort to a wider scope of Exploration activities. The methods will be documented for inclusion in NASA-specific documents (such as the Human Systems Integration Standards, NASA-STD-3000) to be used in future space systems. The current project builds on a previous TDP dealing with Human Factors Engineering processes. That project identified the key phases of the current NASA design lifecycle, and outlined the recommended HFE activities that should be incorporated at each phase. The project also resulted in a prototype of a webbased HFE process tool that could be used to support an ideal HFE development process at NASA. This will help to augment the limited human factors resources available by providing a web-based tool that explains the importance of human factors, teaches a recommended process, and then provides the instructions, templates and examples to carry out the process steps. The HFE activities identified by the previous TDP are being tested in situ for the current effort through support to a specific NASA Exploration activity. Currently, HFE personnel are working with systems engineering personnel to identify HSI impacts for lunar exploration by facilitating the generation of systemlevel Concepts of Operations (ConOps). For example, medical operations scenarios have been generated for lunar habitation in order to identify HSI requirements for the lunar communications architecture. Throughout these ConOps exercises, HFE personnel are testing various tools and methodologies that have been identified in the literature. A key part of the effort is the identification of optimal processes, methods, and tools for these early development phase activities, such as ConOps, requirements development, and early conceptual design. An overview of the activities completed thus far, as well as the tools and methods investigated will be presented.

  17. In situ treatment of VOCs by recirculation technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Siegrist, R.L.; Webb, O.F.; Ally, M.R.

    1993-06-01

    The project described herein was conducted by Oak Ridge National Laboratory (ORNL) to identify processes and technologies developed in Germany that appeared to have near-term potential for enhancing the cleanup of volatile organic compound (VOC) contaminated soil and groundwater at DOE sites. Members of the ORNL research team identified and evaluated selected German technologies developed at or in association with the University of Karlsruhe (UoK) for in situ treatment of VOC contaminated soils and groundwater. Project activities included contacts with researchers within three departments of the UoK (i.e., Applied Geology, Hydromechanics, and Soil and Foundation Engineering) during fall 1991 andmore » subsequent visits to UoK and private industry collaborators during February 1992. Subsequent analyses consisted of engineering computations, groundwater flow modeling, and treatment process modeling. As a result of these project efforts, two processes were identified as having near-term potential for DOE: (1) the vacuum vaporizer well/groundwater recirculation well and (2) the porous pipe/horizontal well. This document was prepared to summarize the methods and results of the assessment activities completed during the initial year of the project. The project is still ongoing, so not all facets of the effort are completely described in this document. Recommendations for laboratory and field experiments are provided.« less

  18. A Simple Approach to Account for Climate Model Interdependence in Multi-Model Ensembles

    NASA Astrophysics Data System (ADS)

    Herger, N.; Abramowitz, G.; Angelil, O. M.; Knutti, R.; Sanderson, B.

    2016-12-01

    Multi-model ensembles are an indispensable tool for future climate projection and its uncertainty quantification. Ensembles containing multiple climate models generally have increased skill, consistency and reliability. Due to the lack of agreed-on alternatives, most scientists use the equally-weighted multi-model mean as they subscribe to model democracy ("one model, one vote").Different research groups are known to share sections of code, parameterizations in their model, literature, or even whole model components. Therefore, individual model runs do not represent truly independent estimates. Ignoring this dependence structure might lead to a false model consensus, wrong estimation of uncertainty and effective number of independent models.Here, we present a way to partially address this problem by selecting a subset of CMIP5 model runs so that its climatological mean minimizes the RMSE compared to a given observation product. Due to the cancelling out of errors, regional biases in the ensemble mean are reduced significantly.Using a model-as-truth experiment we demonstrate that those regional biases persist into the future and we are not fitting noise, thus providing improved observationally-constrained projections of the 21st century. The optimally selected ensemble shows significantly higher global mean surface temperature projections than the original ensemble, where all the model runs are considered. Moreover, the spread is decreased well beyond that expected from the decreased ensemble size.Several previous studies have recommended an ensemble selection approach based on performance ranking of the model runs. Here, we show that this approach can perform even worse than randomly selecting ensemble members and can thus be harmful. We suggest that accounting for interdependence in the ensemble selection process is a necessary step for robust projections for use in impact assessments, adaptation and mitigation of climate change.

  19. Cost analysis of a project to digitize classic articles in neurosurgery*

    PubMed Central

    Bauer, Kathleen

    2002-01-01

    In summer 2000, the Cushing/Whitney Medical Library at Yale University began a demonstration project to digitize classic articles in neurosurgery from the late 1800s and early 1900s. The objective of the first phase of the project was to measure the time and costs involved in digitization, and those results are reported here. In the second phase, metadata will be added to the digitized articles, and the project will be publicized. Thirteen articles were scanned using optical character recognition (OCR) software, and the resulting text files were carefully proofread. Time for photocopying, scanning, and proofreading were recorded. This project achieved an average cost per item (total pages plus images) of $4.12, a figure at the high end of average costs found in other studies. This project experienced high costs for two reasons. First, the articles contained many images, which required extra processing. Second, the older fonts and the poor condition of many of these articles complicated the OCR process. The average article cost $84.46 to digitize. Although costs were high, the selection of historically important articles maximized the benefit gained from the investment in digitization. PMID:11999182

  20. Cost analysis of a project to digitize classic articles in neurosurgery.

    PubMed

    Bauer, Kathleen

    2002-04-01

    In summer 2000, the Cushing/Whitney Medical Library at Yale University began a demonstration project to digitize classic articles in neurosurgery from the late 1800s and early 1900s. The objective of the first phase of the project was to measure the time and costs involved in digitization, and those results are reported here. In the second phase, metadata will be added to the digitized articles, and the project will be publicized. Thirteen articles were scanned using optical character recognition (OCR) software, and the resulting text files were carefully proofread. Time for photocopying, scanning, and proofreading were recorded. This project achieved an average cost per item (total pages plus images) of $4.12, a figure at the high end of average costs found in other studies. This project experienced high costs for two reasons. First, the articles contained many images, which required extra processing. Second, the older fonts and the poor condition of many of these articles complicated the OCR process. The average article cost $84.46 to digitize. Although costs were high, the selection of historically important articles maximized the benefit gained from the investment in digitization.

  1. Selecting healthcare information systems provided by third-party vendors: a mind map beyond the manuals.

    PubMed

    Gortzis, Lefteris G

    2010-01-01

    The selection of a new healthcare information system (HIS) has always been a daunting process for clinicians, health care providers and policy makers. The objective of this study is to present the lessons learned and the main findings from several relevant case studies to support this process. Data were collected by retrospectively reviewing the summative results of three well-established systems, acquiring feedback from two E.U. projects, and conducting semi-structured interviews with a number of collaborators involved in electronic healthcare interventions. Selection issues were identified and classified into the following five categories: (i) data creation, (ii) data management, (iii) data sharing, (iv) data presentation and (v) modules management. A mind map was also structured to provide a more manageable list of issues concerning the most common electronic clinical technologies (e-CT). The vendor manual is intended as an overview of the merchandise e-CT and therefore has limited potential in supporting effectively the selection process of a new HIS. The present classification and the mind map - based on lessons learned - provide a ready-to-use toolkit for supporting the HIS selection process when healthcare organisations are unable to employ research development groups to lay the groundwork for building a new HIS from scratch.

  2. Low-Energy Water Recovery from Subsurface Brines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Choi, Young Chul; Kim, Gyu Dong; Hendren, Zachary

    A novel non-aqueous phase solvent (NAS) desalination process was proposed and developed in this research project. The NAS desalination process uses less energy than thermal processes, doesn’t require any additional chemicals for precipitation, and can be utilized to treat high TDS brine. In this project, our experimental work determined that water solubility changes and selective absorption are the key characteristics of NAS technology for successful desalination. Three NAS desalination mechanisms were investigated: (1) CO2 switchable, (2) high-temp absorption to low-temp desorption (thermally switchable), and (3) low-temp absorption to high-temp desorption (thermally switchable). Among these mechanisms, thermally switchable (low-temp absorption tomore » high-temp desorption) showed the highest water recovery and relatively high salt rejection. A test procedure for semi-continuous, bench scale NAS desalination process was also developed and used to assess performance under a range of conditions.« less

  3. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  4. 76 FR 3190 - Notice of Funding Availability for Applications for Credit Assistance Under the Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-19

    ...The DOT's TIFIA Joint Program Office (JPO) announces the availability of funding to support new applications for credit assistance. Under TIFIA, the DOT provides secured (direct) loans, lines of credit, and loan guarantees to public and private applicants for eligible surface transportation projects of regional or national significance. Projects must meet statutorily specified criteria to be selected for credit assistance. Because demand for the TIFIA program can exceed budgetary resources, the DOT is utilizing periodic fixed-date solicitations that will establish a competitive group of projects to be evaluated against the program objectives. This notice outlines the process that applicants must follow.

  5. The American Board of Radiology Perspective on Maintenance of Certification: Part IV: Practice quality improvement in radiologic physics.

    PubMed

    Frey, G Donald; Ibbott, Geoffrey S; Morin, Richard L; Paliwal, Bhudatt R; Thomas, Stephen R; Bosma, Jennifer

    2007-11-01

    Recent initiatives of the American Board of Medical Specialties (ABMS) in the area of maintenance of certification (MOC) have been reflective of the response of the medical community to address public concerns regarding quality of care, medical error reduction, and patient safety. In March 2000, the 24 member boards of the ABMS representing all medical subspecialties in the USA agreed to initiate specialty-specific maintenance of certification (MOC) programs. The American Board of Radiology (ABR) MOC program for diagnostic radiology, radiation oncology, and radiologic physics has been developed, approved by the ABMS, and initiated with full implementation for all three disciplines beginning in 2007. The overriding objective of MOC is to improve the quality of health care through diplomate-initiated learning and quality improvement. The four component parts to the MOC process are: Part I: Professional standing, Part II: Evidence of life long learning and periodic self-assessment, Part III: Cognitive expertise, and Part IV: Evaluation of performance in practice (with the latter being the focus of this paper). The key components of Part IV require a physicist-based response to demonstrate commitment to practice quality improvement (PQI) and progress in continuing individual competence in practice. Diplomates of radiologic physics must select a project to be completed over the ten-year cycle that potentially can improve the quality of the diplomate's individual or systems practice and enhance the quality of care. Five categories have been created from which an individual radiologic physics diplomate can select one required PQI project: (1) Safety for patients, employees, and the public, (2) accuracy of analyses and calculations, (3) report turnaround time and communication issues, (4) practice guidelines and technical standards, and (5) surveys (including peer review of self-assessment reports). Each diplomate may select a project appropriate for an individual, participate in a project within a clinical department, participate in a peer review of a self-assessment report, or choose a qualified national project sponsored by a society. Once a project has been selected, the steps are: (1) Collect baseline data relevant to the chosen project, (2) review and analyze the data, (3) create and implement an improvement plan, (4) remeasure and track, and (5) report participation to the ABR, using the template provided by the ABR. These steps begin in Year 2, following training in Year 1. Specific examples of individual PQI projects for each of the three disciplines of radiologic physics are provided. Now, through the MOC programs, the relationship between the radiologic physicist and the ABR will be continuous through the diplomate's professional career. The ABR is committed to providing an effective infrastructure that will promote and assist the process of continuing professional development including the enhancement of practice quality improvement for radiologic physicists.

  6. A Framework for Usability Evaluation in EHR Procurement.

    PubMed

    Tyllinen, Mari; Kaipio, Johanna; Lääveri, Tinja

    2018-01-01

    Usability should be considered already by the procuring organizations when selecting future systems. In this paper, we present a framework for usability evaluation during electronic health record (EHR) system procurement. We describe the objectives of the evaluation, the procedure, selected usability attributes and the evaluation methods to measure them. We also present the emphasis usability had in the selection process. We do not elaborate on the details of the results, the application of methods or gathering of data. Instead we focus on the components of the framework to inform and give an example to other similar procurement projects.

  7. ENVIRONMENTAL RISK ASSESSMENT OF PHOSPHATE-BASED REMEDIAL TECHNOLOGY IN METAL CONTAMINATED URBAN AND MINING AREAS IN A SELECTED MISSOURI SUPERFUND SITE

    EPA Science Inventory

    This project provided important data on fundamental processes responsible for health and environmental risk reductions and environmental safety of the phosphate-based treatments in metal, specifically Pb, contaminated soils. By an integrated approach of environmental risk asse...

  8. "Frankenstein" Goes to Engineering School

    ERIC Educational Resources Information Center

    Winkelman, Paul

    2006-01-01

    The development of an engineering curriculum assumes a body of knowledge that students, as future engineers, will need to know. Students acquire this body of knowledge through lectures, laboratories, projects and assignments and other means. The question then arises, how does one select the content and processes that are appropriate for the…

  9. 7 CFR 1780.17 - Selection priorities and process.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the population to be served by the proposed project is: (1) Less than the poverty line if the poverty... than the poverty line and between 80% and 100%, inclusive, of the State's nonmetropolitan median... problems or natural disasters. The Administrator may delegate the authority to assign the 15 points to...

  10. 7 CFR 1780.17 - Selection priorities and process.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the population to be served by the proposed project is: (1) Less than the poverty line if the poverty... than the poverty line and between 80% and 100%, inclusive, of the State's nonmetropolitan median... problems or natural disasters. The Administrator may delegate the authority to assign the 15 points to...

  11. IMPLICATIONS OF VOCATIONAL EDUCATION FOR PLANT SITE LOCATION.

    ERIC Educational Resources Information Center

    DEAN, ERNEST H.

    THE PURPOSE OF THIS PROJECT WAS TO DETERMINE THE SIGNIFICANCE OF VOCATIONAL-TECHNICAL EDUCATION IN THE MANUFACTURING INDUSTRY PLANT SITE SELECTION PROCESS. FROM A COMPOSITE LISTING OF 619 MANUFACTURING COMPANIES WHICH HAD LOCATED IN COLORADO, NEW MEXICO, ARIZONA, NEVADA, IDAHO, UTAH, AND WYOMING SINCE JANUARY 1960, 116 INTERVIEWS AND 90 COMPLETED…

  12. An Examination of Ideology among Selected K12 Christian School Superintendents

    ERIC Educational Resources Information Center

    Dolson, Jimmy L.

    2013-01-01

    This research project focused on explaining the decision making process of K12 Christian school superintendents whose schools belong to the Association of Christian Schools International (ACSI) organization. In spite of their similar religious and philosophical beliefs, ACSI K12 Christian school superintendents differed significantly in…

  13. 33 CFR 263.19 - Detailed project reports.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... report will generally meet the requirements of ER 1110-2-1150, as it pertains to Phase II AE&D studies... that the planning process should be generally considered the same for studies conducted under all... for arriving at the selected plan and recommendations for Federal participation. (c) The level of...

  14. Model for Presenting Resources in Scholar's Portal

    ERIC Educational Resources Information Center

    Feeney, Mary; Newby, Jill

    2005-01-01

    Presenting electronic resources to users through a federated search engine introduces unique opportunities and challenges to libraries. This article reports on the decision-making tools and processes used for selecting collections of electronic resources by a project team at the University of Arizona (UA) Libraries for the Association of Research…

  15. Content Analysis Schedule for Bilingual Education Programs: Proyecto PAL.

    ERIC Educational Resources Information Center

    Gonzalez, Castor

    This content analysis schedule for "Proyecto PAL" in San Jose, California, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the linguistic…

  16. Science Fair Projects. LC Science Tracer Bullet. TB 07-6

    ERIC Educational Resources Information Center

    Howland, Joyce, Comp.

    2007-01-01

    Selected sources in this bibliography provide guidance to students, parents, and teachers throughout the process of planning, developing, implementing and competing in science fair activities. Sources range in suitability from elementary to high school levels. This guide updates "Library of Congress Science Tracer Bullet" 01-4. More specialized…

  17. Compatibility of Common Instructional Models with the DACUM Process

    ERIC Educational Resources Information Center

    Wyrostek, Warren; Downey, Steven

    2017-01-01

    Practitioners use an expansive array of instructional design models. Although many of these models acknowledge the need for analyzing occupational roles, they do not define steps for conducting these analyses. This article reviews prominent models and provides prescriptive guidance for selecting appropriate models given a project's (a) Product…

  18. Terrestrail indicators and measurements: Selection process and preliminary recommendations

    USDA-ARS?s Scientific Manuscript database

    The objective of this project is to identify a small set of core indicators and measurements that can be applied across rangeland, forest and riparian ecosystems managed by the BLM. A set of core indicators quantified using standardized measurements allows data to be integrated across field office, ...

  19. A Hierarchical Analysis of Bridge Decision Makers; the Role of New Technology Adoption in the Timber Bridge Market: Special Project Fiscal Year 1992

    DOT National Transportation Integrated Search

    1995-08-01

    Bridge design engineers and local highway officials make bridge replacement decsions across the U.S. The Analytical Hierarchical Process was used to characterize the bridge material selection decisions of these individuals. State Departments of Trans...

  20. Instrumental and Vocal Teacher Education: Competences, Roles and Curricula

    ERIC Educational Resources Information Center

    Lennon, Mary; Reed, Geoffrey

    2012-01-01

    This article focuses on selected outcomes of the European Association of Conservatoires (AEC) "Polifonia" Working Group for Instrumental and Vocal Teacher Training in Europe (2007-2010). The introduction provides the background to the project, explains the rationale and objectives, describes the research process and gives an overview of…

  1. Talent Identification in Track and Field.

    ERIC Educational Resources Information Center

    Henson, Phillip; And Others

    Talent identification in most sports occurs through mass participation and the process of natural selection; track and field does not enjoy such widespread participation. This paper reports on a project undertaken for the following purposes: improve the means by which youth with the potential for high level performance can be identified; develop…

  2. Barriers to School Restructuring.

    ERIC Educational Resources Information Center

    Sheane, Kim; Bierlein, Louann

    In 1990, the Arizona legislature initiated the Arizona School Restructuring Pilot Project. This report identifies local- and state-level barriers encountered in the first 2 years. Outcomes are presented for the 15 pilot schools--11 elementary and 4 high schools--that were selected in a competitive grant process. Data were collected through school…

  3. Challenges in Technology Implementation for Learning Spaces in Higher Education

    ERIC Educational Resources Information Center

    Lewis, Bryan; Starsia, Gerald

    2009-01-01

    The design and implementation of technology can prove a particularly daunting challenge for campus planners and project designers. Specialization is required for the selection and implementation of technologies including the familiar network, telecommunications, and data-processing functions, and also the more esoteric emerging technology labs and…

  4. The DREME Network: Research and Interventions in Early Childhood Mathematics.

    PubMed

    Day-Hess, Crystal; Clements, Douglas H

    2017-01-01

    The DREME Network was created to advance the field of early mathematics research and improves the opportunities to develop math competencies offered to children birth through age 8 years, with an emphasis on the preschool years. All four main Network projects will have implications for interventions. Section 1 introduces the Network and its four projects. The remainder of the chapter focuses on one of these four projects, Making More of Math (MMM), in depth. MMM is directly developing an intervention for children, based on selecting high-quality instructional activities culled from the burgeoning curriculum resources. We first report a review of 457 activities from 6 research-based curricula, which describes the number of activities by content focus, type (nature), and setting of each activity. Given the interest in higher-order thinking skills and self-regulation, we then identified activities that had the potential to, develop both mathematics and executive function (EF) proficiencies. We rated these, selecting the top 10 for extensive coding by mathematics content and EF processes addressed. We find a wide divergence across curricula in all these categories and provide comprehensive reports for those interested in selecting, using, or developing early mathematics curricula. © 2017 Elsevier Inc. All rights reserved.

  5. 7 CFR 1944.529 - Project selection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 13 2012-01-01 2012-01-01 false Project selection. 1944.529 Section 1944.529...) PROGRAM REGULATIONS (CONTINUED) HOUSING Technical and Supervisory Assistance Grants § 1944.529 Project selection. (a) Projects must meet the following criteria: (1) Provide a program of supervisory assistance as...

  6. 7 CFR 1944.529 - Project selection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 13 2014-01-01 2013-01-01 true Project selection. 1944.529 Section 1944.529...) PROGRAM REGULATIONS (CONTINUED) HOUSING Technical and Supervisory Assistance Grants § 1944.529 Project selection. (a) Projects must meet the following criteria: (1) Provide a program of supervisory assistance as...

  7. 7 CFR 1944.529 - Project selection.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 13 2013-01-01 2013-01-01 false Project selection. 1944.529 Section 1944.529...) PROGRAM REGULATIONS (CONTINUED) HOUSING Technical and Supervisory Assistance Grants § 1944.529 Project selection. (a) Projects must meet the following criteria: (1) Provide a program of supervisory assistance as...

  8. 7 CFR 1944.529 - Project selection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 13 2011-01-01 2009-01-01 true Project selection. 1944.529 Section 1944.529...) PROGRAM REGULATIONS (CONTINUED) HOUSING Technical and Supervisory Assistance Grants § 1944.529 Project selection. (a) Projects must meet the following criteria: (1) Provide a program of supervisory assistance as...

  9. CO2 Acquisition Membrane (CAM) Project

    NASA Technical Reports Server (NTRS)

    Mason, Larry W.

    2003-01-01

    The CO2 Acquisition Membrane (CAM) project was performed to develop, test, and analyze thin film membrane materials for separation and purification of carbon dioxide (CO2) from mixtures of gases, such as those found in the Martian atmosphere. The membranes developed in this project are targeted toward In Situ Resource Utilization (ISRU) applications, such as In Situ Propellant Production (ISPP) and In Situ Consumables Production (ISCP). These membrane materials may be used in a variety of ISRU systems, for example as the atmospheric inlet filter for an ISPP process to enhance the concentration of CO2 for use as a reactant gas, to passively separate argon and nitrogen trace gases from CO2 for habitat pressurization, to provide a system for removal of CO2 from breathing gases in a closed environment, or within a process stream to selectively separate CO2 from other gaseous components. The membranes identified and developed for CAM were evaluated for use in candidate ISRU processes and other gas separation applications, and will help to lay the foundation for future unmanned sample return and human space missions. CAM is a cooperative project split among three institutions: Lockheed Martin Astronautics (LMA), the Colorado School of Mines (CSM), and Marshall Space Flight Center (MSFC).

  10. Design of components for growing higher plants in space

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The overall goal of this project is to design unique systems and components for growing higher plants in microgravity during long-term space missions (Mars and beyond). Specific design tasks were chosen to contribute to and supplement NASA's Controlled Ecological Life Support System (CELSS) project. Selected tasks were automated seeding of plants, plant health sensing, and food processing. Prototype systems for planting both germinated and nongerminated seeds were fabricated and tested. Water and air pressure differences and electrostatic fields were used to trap seeds for separation and transport for planting. An absorption spectrometer was developed to measure chlorophyll levels in plants as an early warning of plant health problems. In the area of food processing, a milling system was created using high-speed rotating blades which were aerodynamically configured to produce circulation and retractable to prevent leakage. The project produced significant results having substantial benefit to NASA. It also provided an outstanding learning experience for the students involved.

  11. Case Study of Using High Performance Commercial Processors in Space

    NASA Technical Reports Server (NTRS)

    Ferguson, Roscoe C.; Olivas, Zulema

    2009-01-01

    The purpose of the Space Shuttle Cockpit Avionics Upgrade project (1999 2004) was to reduce crew workload and improve situational awareness. The upgrade was to augment the Shuttle avionics system with new hardware and software. A major success of this project was the validation of the hardware architecture and software design. This was significant because the project incorporated new technology and approaches for the development of human rated space software. An early version of this system was tested at the Johnson Space Center for one month by teams of astronauts. The results were positive, but NASA eventually cancelled the project towards the end of the development cycle. The goal to reduce crew workload and improve situational awareness resulted in the need for high performance Central Processing Units (CPUs). The choice of CPU selected was the PowerPC family, which is a reduced instruction set computer (RISC) known for its high performance. However, the requirement for radiation tolerance resulted in the re-evaluation of the selected family member of the PowerPC line. Radiation testing revealed that the original selected processor (PowerPC 7400) was too soft to meet mission objectives and an effort was established to perform trade studies and performance testing to determine a feasible candidate. At that time, the PowerPC RAD750s were radiation tolerant, but did not meet the required performance needs of the project. Thus, the final solution was to select the PowerPC 7455. This processor did not have a radiation tolerant version, but had some ability to detect failures. However, its cache tags did not provide parity and thus the project incorporated a software strategy to detect radiation failures. The strategy was to incorporate dual paths for software generating commands to the legacy Space Shuttle avionics to prevent failures due to the softness of the upgraded avionics.

  12. Case Study of Using High Performance Commercial Processors in a Space Environment

    NASA Technical Reports Server (NTRS)

    Ferguson, Roscoe C.; Olivas, Zulema

    2009-01-01

    The purpose of the Space Shuttle Cockpit Avionics Upgrade project was to reduce crew workload and improve situational awareness. The upgrade was to augment the Shuttle avionics system with new hardware and software. A major success of this project was the validation of the hardware architecture and software design. This was significant because the project incorporated new technology and approaches for the development of human rated space software. An early version of this system was tested at the Johnson Space Center for one month by teams of astronauts. The results were positive, but NASA eventually cancelled the project towards the end of the development cycle. The goal to reduce crew workload and improve situational awareness resulted in the need for high performance Central Processing Units (CPUs). The choice of CPU selected was the PowerPC family, which is a reduced instruction set computer (RISC) known for its high performance. However, the requirement for radiation tolerance resulted in the reevaluation of the selected family member of the PowerPC line. Radiation testing revealed that the original selected processor (PowerPC 7400) was too soft to meet mission objectives and an effort was established to perform trade studies and performance testing to determine a feasible candidate. At that time, the PowerPC RAD750s where radiation tolerant, but did not meet the required performance needs of the project. Thus, the final solution was to select the PowerPC 7455. This processor did not have a radiation tolerant version, but faired better than the 7400 in the ability to detect failures. However, its cache tags did not provide parity and thus the project incorporated a software strategy to detect radiation failures. The strategy was to incorporate dual paths for software generating commands to the legacy Space Shuttle avionics to prevent failures due to the softness of the upgraded avionics.

  13. Analytic hierarchy process helps select site for limestone quarry expansion in Barbados.

    PubMed

    Dey, Prasanta Kumar; Ramcharan, Eugene K

    2008-09-01

    Site selection is a key activity for quarry expansion to support cement production, and is governed by factors such as resource availability, logistics, costs, and socio-economic-environmental factors. Adequate consideration of all the factors facilitates both industrial productivity and sustainable economic growth. This study illustrates the site selection process that was undertaken for the expansion of limestone quarry operations to support cement production in Barbados. First, alternate sites with adequate resources to support a 25-year development horizon were identified. Second, technical and socio-economic-environmental factors were then identified. Third, a database was developed for each site with respect to each factor. Fourth, a hierarchical model in analytic hierarchy process (AHP) framework was then developed. Fifth, the relative ranking of the alternate sites was then derived through pair wise comparison in all the levels and through subsequent synthesizing of the results across the hierarchy through computer software (Expert Choice). The study reveals that an integrated framework using the AHP can help select a site for the quarry expansion project in Barbados.

  14. SU-C-207-04: Reconstruction Artifact Reduction in X-Ray Cone Beam CT Using a Treatment Couch Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lasio, G; Hu, E; Zhou, J

    2015-06-15

    Purpose: to mitigate artifacts induced by the presence of the RT treatment couch in on-board CBCT and improve image quality Methods: a model of a Varian IGRT couch is constructed using a CBCT scan of the couch in air. The model is used to generate a set of forward projections (FP) of the treatment couch at specified gantry angles. The model couch forward projections are then used to process CBCT scan projections which contain the couch in addition to the scan object (Catphan phantom), in order to remove the attenuation component of the couch at any given gantry angle. Priormore » to pre-processing with the model FP, the Catphan projection data is normalized to an air scan with bowtie filter. The filtered Catphan projections are used to reconstruct the CBCT with an in-house FDK algorithm. The artifact reduction in the processed CBCT scan is assessed visually, and the image quality improvement is measured with the CNR over a few selected ROIs of the Catphan modules. Results: Sufficient match between the forward projected data and the x-ray projections is achieved to allow filtering in attenuation space. Visual improvement of the couch induced artifacts is achieved, with a moderate expense of CNR. Conclusion: Couch model-based correction of CBCT projection data has a potential for qualitative improvement of clinical CBCT scans, without requiring position specific correction data. The technique could be used to produce models of other artifact inducing devices, such as immobilization boards, and reduce their impact on patient CBCT images.« less

  15. Projecting cumulative benefits of multiple river restoration projects: an example from the Sacramento-San Joaquin River system in California

    USGS Publications Warehouse

    Kondolf, G. Mathias; Angermeier, Paul L.; Cummins, Kenneth; Dunne, Thomas; Healey, Michael; Kimmerer, Wim; Moyle, Peter B.; Murphy, Dennis; Patten, Duncan; Railsback, Steve F.; Reed, Denise J.; Spies, Robert B.; Twiss, Robert

    2008-01-01

    Despite increasingly large investments, the potential ecological effects of river restoration programs are still small compared to the degree of human alterations to physical and ecological function. Thus, it is rarely possible to “restore” pre-disturbance conditions; rather restoration programs (even large, well-funded ones) will nearly always involve multiple small projects, each of which can make some modest change to selected ecosystem processes and habitats. At present, such projects are typically selected based on their attributes as individual projects (e.g., consistency with programmatic goals of the funders, scientific soundness, and acceptance by local communities), and ease of implementation. Projects are rarely prioritized (at least explicitly) based on how they will cumulatively affect ecosystem function over coming decades. Such projections require an understanding of the form of the restoration response curve, or at least that we assume some plausible relations and estimate cumulative effects based thereon. Drawing on our experience with the CALFED Bay-Delta Ecosystem Restoration Program in California, we consider potential cumulative system-wide benefits of a restoration activity extensively implemented in the region: isolating/filling abandoned floodplain gravel pits captured by rivers to reduce predation of outmigrating juvenile salmon by exotic warmwater species inhabiting the pits. We present a simple spreadsheet model to show how different assumptions about gravel pit bathymetry and predator behavior would affect the cumulative benefits of multiple pit-filling and isolation projects, and how these insights could help managers prioritize which pits to fill.

  16. Macroalgae for CO 2 Capture and Renewable Energy - A Pilot Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiley, Kristine

    2011-01-31

    The objective of this project was to demonstrate, at a pilot scale, the beneficial use of carbon dioxide (CO 2) through a technology designed to capture CO 2 from fossil-fuel fired power plant stack gas, generating macroalgae and converting the macroalgae at high efficiency to renewable methane that can be utilized in the power plant or introduced into a natural gas pipeline. The proposed pilot plant would demonstrate the cost-effectiveness and CO 2/ NO x flue-gas removal efficiency of an innovative algal scrubber technology where seaweeds are grown out of water on specially-designed supporting structures contained within greenhouses where themore » plants are constantly bathed by recycled nutrient sprays enriched by flue gas constituents. The work described in this document addresses Phase 1 of the project only. The scope of work for Phase 1 includes the completion of a preliminary design package; the collection of additional experimental data to support the preliminary and detailed design for a pilot scale utilization of CO 2 to cultivate macroalage and to process that algae to produce methane; and a technological and economic analysis to evaluate the potential of the system. Selection criteria for macroalgae that could survive the elevated temperatures and potential periodic desiccation of near desert project sites were identified. Samples of the selected macroalgae species were obtained and then subjected to anaerobic digestion to determine conversions and potential methane yields. A Process Design Package (PDP) was assembled that included process design, process flow diagram, material balance, instrumentation, and equipment list, sizes, and cost for the Phase 2 pilot plant. Preliminary economic assessments were performed under the various assumptions made, which are purposely conservative. Based on the results, additional development work should be conducted to delineate the areas for improving efficiency, reducing contingencies, and reducing overall costs.« less

  17. External Standards or Standard Addition? Selecting and Validating a Method of Standardization

    NASA Astrophysics Data System (ADS)

    Harvey, David T.

    2002-05-01

    A common feature of many problem-based laboratories in analytical chemistry is a lengthy independent project involving the analysis of "real-world" samples. Students research the literature, adapting and developing a method suitable for their analyte, sample matrix, and problem scenario. Because these projects encompass the complete analytical process, students must consider issues such as obtaining a representative sample, selecting a method of analysis, developing a suitable standardization, validating results, and implementing appropriate quality assessment/quality control practices. Most textbooks and monographs suitable for an undergraduate course in analytical chemistry, however, provide only limited coverage of these important topics. The need for short laboratory experiments emphasizing important facets of method development, such as selecting a method of standardization, is evident. The experiment reported here, which is suitable for an introductory course in analytical chemistry, illustrates the importance of matrix effects when selecting a method of standardization. Students also learn how a spike recovery is used to validate an analytical method, and obtain a practical experience in the difference between performing an external standardization and a standard addition.

  18. Some advances/results in monitoring road cracks from 2D pavement images within the scope of the collaborative FP7 TRIMM project

    NASA Astrophysics Data System (ADS)

    Baltazart, Vincent; Moliard, Jean-Marc; Amhaz, Rabih; Wright, Dean; Jethwa, Manish

    2015-04-01

    Monitoring road surface conditions is an important issue in many countries. Several projects have looked into this issue in recent years, including TRIMM 2011-2014. The objective of such projects has been to detect surface distresses, like cracking, raveling and water ponding, in order to plan effective road maintenance and to afford a better sustainability of the pavement. The monitoring of cracking conventionally focuses on open cracks on the surface of the pavement, as opposed to reflexive cracks embedded in the pavement materials. For monitoring surface condition, in situ human visual inspection has been gradually replaced by automatic image data collection at traffic speed. Off-line image processing techniques have been developed for monitoring surface condition in support of human visual control. Full automation of crack monitoring has been approached with caution, and depends on a proper manual assessment of the performance. This work firstly presents some aspects of the current state of monitoring that have been reported so far in the literature and in previous projects: imaging technology and image processing techniques. Then, the work presents the two image processing techniques that have been developed within the scope of the TRIMM project to automatically detect pavement cracking from images. The first technique is a heuristic approach (HA) based on the search for gradient within the image. It was originally developed to process pavement images from the French imaging device, Aigle-RN. The second technique, the Minimal Path Selection (MPS) method, has been developed within an ongoing PhD work at IFSTTAR. The proposed new technique provides a fine and accurate segmentation of the crack pattern along with the estimation of the crack width. HA has been assessed against the field data collection provided by Yotta and TRL with the imaging device Tempest 2. The performance assessment has been threefold: first it was performed against the reference data set including 130 km of pavement images over UK roads, second over a few selected short sections of contiguous pavement images, and finally over a few sample images as a case study. The performance of MPS has been assessed against an older image data base. Pixel-based PGT was available to provide the most sensitive performance assessment. MPS has shown its ability to provide a very accurate cracking pattern without reducing the image resolution on the segmented images. Thus, it allows measurement of the crack width; it is found to behave more robustly against the image texture and better matched for dealing with low contrast pavement images. The benchmarking of seven automatic segmentation techniques has been provided at both the pixel and the grid levels. The performance assessment includes three minimal path selection algorithms, namely MPS, Free Form Anisotropy (FFA), one geodesic contour with automatic selection of points of interests (GC-POI), HA, and two Markov-based methods. Among others, MPS approach reached the best performance at the pixel level while it is matched to the FFA approach at the grid level. Finally, the project has emphasized the need for a reliable ground truth data collection. Owing to its accuracy, MPS may serve as a reference benchmark for other methods to provide the automatic segmentation of pavement images at the pixel level and beyond. As a counterpart, MPS requires a reduction in the computing time. Keywords: cracking, automatic segmentation, image processing, pavement, surface distress, monitoring, DICE, performance

  19. [Requirements for the successful installation of an data management system].

    PubMed

    Benson, M; Junger, A; Quinzio, L; Hempelmann, G

    2002-08-01

    Due to increasing requirements on medical documentation, especially with reference to the German Social Law binding towards quality management and introducing a new billing system (DRGs), an increasing number of departments consider to implement a patient data management system (PDMS). The installation should be professionally planned as a project in order to insure and complete a successful installation. The following aspects are essential: composition of the project group, definition of goals, finance, networking, space considerations, hardware, software, configuration, education and support. Project and finance planning must be prepared before beginning the project and the project process must be constantly evaluated. In selecting the software, certain characteristics should be considered: use of standards, configurability, intercommunicability and modularity. Our experience has taught us that vaguely defined goals, insufficient project planning and the existing management culture are responsible for the failure of PDMS installations. The software used tends to play a less important role.

  20. A survey of structural material issues for a space station

    NASA Technical Reports Server (NTRS)

    Hagaman, J. A.

    1985-01-01

    An NASA enters the definition phase of the space station project, one of the important issues to be considered is structural material selection. The complexity of the space station and its long life requirement are two key factors which must be considered in the material selection process. Both aluminum and graphite/epoxy are considered as potential structural materials. Advantages and disadvantages of these materials with respect to mechanical and thermal considerations, space environment, manufacturing, and cost are discussed.

  1. Selective Use of the Mother Tongue to Enhance Students' English Learning Processes…Beyond the Same Assumptions (Uso selectivo de la lengua materna para mejorar el proceso de aprendizaje del inglés de los estudiantes…Más allá de las mismas suposiciones)

    ERIC Educational Resources Information Center

    Cuartas Alvarez, Luis Fernando

    2014-01-01

    This article reports the results of an action-research project that examines enhancing students' English learning processes through the selective use of their mother tongues with the aim of overcoming their reluctant attitudes toward learning English in the classroom. This study involves forty ninth-graders from an all-girls public school in…

  2. Catalytic Production of Ethanol from Biomass-Derived Synthesis Gas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trewyn, Brian G.; Smith, Ryan G.

    2016-06-01

    Heterogeneous catalysts have been developed for the conversion of biomass-derived synthetic gas (syngas) to ethanol. The objectives of this project were to develop a clean synthesis gas from biomass and develop robust catalysts with high selectivity and lifetime for C 2 oxygenate production from biomass-derived syngas and surrogate syngas. During the timeframe for this project, we have made research progress on the four tasks: (1) Produce clean bio-oil generated from biomass, such as corn stover or switchgrass, by using fast pyrolysis system, (2) Produce clean, high pressure synthetic gas (syngas: carbon monoxide, CO, and hydrogen, H 2) from bio-oil generatedmore » from biomass by gasification, (3) Develop and characterize mesoporous mixed oxide-supported metal catalysts for the selective production of ethanol and other alcohols, such as butanol, from synthesis gas, and (4) Design and build a laboratory scale synthesis gas to ethanol reactor system evaluation of the process. In this final report, detailed explanations of the research challenges associated with this project are given. Progress of the syngas production from various biomass feedstocks and catalyst synthesis for upgrading the syngas to C 2-oxygenates is included. Reaction properties of the catalyst systems under different reaction conditions and different reactor set-ups are also presented and discussed. Specifically, the development and application of mesoporous silica and mesoporous carbon supports with rhodium nanoparticle catalysts and rhodium nanoparticle with manganese catalysts are described along with the significant material characterizations we completed. In addition to the synthesis and characterization, we described the activity and selectivity of catalysts in our micro-tubular reactor (small scale) and fixed bed reactor (larger scale). After years of hard work, we are proud of the work done on this project, and do believe that this work will provide a solid foundation for the future production of syngas from biomass and the development of heterogeneous catalysts for the syngas to C 2-oxygenate process and for the commercialization of this process. Potential future directions for this research are also discussed within the report.« less

  3. 49 CFR 268.17 - Project selection criteria.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... criteria will govern FRA's selection of projects to receive funding under the Maglev Deployment Program. (a... are to be expected in the United States. (4) The degree to which the project will augment a Maglev... development status of the Maglev technology selected by the applicant for the project. (c) Benefits for the...

  4. 49 CFR 268.17 - Project selection criteria.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... criteria will govern FRA's selection of projects to receive funding under the Maglev Deployment Program. (a... are to be expected in the United States. (4) The degree to which the project will augment a Maglev... development status of the Maglev technology selected by the applicant for the project. (c) Benefits for the...

  5. MATLAB software for viewing and processing u-channel and discrete sample paleomagnetic data: UPmag and DPmag

    NASA Astrophysics Data System (ADS)

    Xuan, C.; Channell, J. E.

    2009-12-01

    With the increasing efficiency of acquiring paleomagnetic data from u-channel or discrete samples, large volumes of data can be accumulated within a short time period. It is often critical to visualize and process these data in “real time” as measurements proceed, so that the measurement plan can be dictated accordingly. New MATLABTM software, UPmag and DPmag, are introduced for easy and rapid analysis of natural remanent magnetization (NRM) and laboratory-induced remanent magnetization data for u-channel and discrete samples, respectively. UPmag comprises three MATLABTM graphic user interfaces: UVIEW, UDIR, and UINT. UVIEW allows users to open and check through measurement data from the magnetometer as well as to correct detected flux-jumps in the data, and to export files for further treatment. UDIR reads the *.dir file generated by UVIEW, automatically calculates component directions using selectable demagnetization range(s) with anchored or free origin, and displays orthogonal projections and stepwise intensity plots for any position along the u-channel sample. UDIR can also display data on equal area stereographic projections and draw virtual geomagnetic poles (VGP) on various map projections. UINT provides a convenient platform to evaluate relative paleointensity estimates using the *.int files that can be exported from UVIEW. DPmag comprises two MATLABTM graphic user interfaces: DDIR and DFISHER. DDIR reads output files from the discrete sample magnetometer measurement system. DDIR allows users to calculate component directions for each discrete sample, to plot the demagnetization data on orthogonal projections and equal area projections, as well as to show the stepwise intensity data. DFISHER reads the *.pca file exported from DDIR, calculates VGP and Fisher statistics for data from selected groups of samples, and plots the results on equal area projections and as VGPs on a range of map projections. Data and plots from UPmag and DPmag can be exported to various file formats.

  6. Selective neural pathway targeting reveals key roles of thalamostriatal projection in the control of visual discrimination.

    PubMed

    Kato, Shigeki; Kuramochi, Masahito; Kobayashi, Kenta; Fukabori, Ryoji; Okada, Kana; Uchigashima, Motokazu; Watanabe, Masahiko; Tsutsui, Yuji; Kobayashi, Kazuto

    2011-11-23

    The dorsal striatum receives converging excitatory inputs from diverse brain regions, including the cerebral cortex and the intralaminar/midline thalamic nuclei, and mediates learning processes contributing to instrumental motor actions. However, the roles of each striatal input pathway in these learning processes remain uncertain. We developed a novel strategy to target specific neural pathways and applied this strategy for studying behavioral roles of the pathway originating from the parafascicular nucleus (PF) and projecting to the dorsolateral striatum. A highly efficient retrograde gene transfer vector encoding the recombinant immunotoxin (IT) receptor was injected into the dorsolateral striatum in mice to express the receptor in neurons innervating the striatum. IT treatment into the PF of the vector-injected animals caused a selective elimination of neurons of the PF-derived thalamostriatal pathway. The elimination of this pathway impaired the response selection accuracy and delayed the motor response in the acquisition of a visual cue-dependent discrimination task. When the pathway elimination was induced after learning acquisition, it disturbed the response accuracy in the task performance with no apparent change in the response time. The elimination did not influence spontaneous locomotion, methamphetamine-induced hyperactivity, and motor skill learning that demand the function of the dorsal striatum. These results demonstrate that thalamostriatal projection derived from the PF plays essential roles in the acquisition and execution of discrimination learning in response to sensory stimulus. The temporal difference in the pathway requirement for visual discrimination suggests a stage-specific role of thalamostriatal pathway in the modulation of response time of learned motor actions.

  7. System Integration of FastSPECT III, a Dedicated SPECT Rodent-Brain Imager Based on BazookaSPECT Detector Technology

    PubMed Central

    Miller, Brian W.; Furenlid, Lars R.; Moore, Stephen K.; Barber, H. Bradford; Nagarkar, Vivek V.; Barrett, Harrison H.

    2010-01-01

    FastSPECT III is a stationary, single-photon emission computed tomography (SPECT) imager designed specifically for imaging and studying neurological pathologies in rodent brain, including Alzheimer’s and Parkinsons’s disease. Twenty independent BazookaSPECT [1] gamma-ray detectors acquire projections of a spherical field of view with pinholes selected for desired resolution and sensitivity. Each BazookaSPECT detector comprises a columnar CsI(Tl) scintillator, image-intensifier, optical lens, and fast-frame-rate CCD camera. Data stream back to processing computers via firewire interfaces, and heavy use of graphics processing units (GPUs) ensures that each frame of data is processed in real time to extract the images of individual gamma-ray events. Details of the system design, imaging aperture fabrication methods, and preliminary projection images are presented. PMID:21218137

  8. Airborne Wind Profiling With the Data Acquisition and Processing System for a Pulsed 2-Micron Coherent Doppler Lidar System

    NASA Technical Reports Server (NTRS)

    Beyon, Jeffrey Y.; Koch, Grady J.; Kavaya, Michael J.

    2012-01-01

    A pulsed 2-micron coherent Doppler lidar system at NASA Langley Research Center in Virginia flew on the NASA's DC-8 aircraft during the NASA Genesis and Rapid Intensification Processes (GRIP) during the summer of 2010. The participation was part of the project Doppler Aerosol Wind Lidar (DAWN) Air. Selected results of airborne wind profiling are presented and compared with the dropsonde data for verification purposes. Panoramic presentations of different wind parameters over a nominal observation time span are also presented for selected GRIP data sets. The realtime data acquisition and analysis software that was employed during the GRIP campaign is introduced with its unique features.

  9. Tomography and Purification of the Temporal-Mode Structure of Quantum Light

    NASA Astrophysics Data System (ADS)

    Ansari, Vahid; Donohue, John M.; Allgaier, Markus; Sansoni, Linda; Brecht, Benjamin; Roslund, Jonathan; Treps, Nicolas; Harder, Georg; Silberhorn, Christine

    2018-05-01

    High-dimensional quantum information processing promises capabilities beyond the current state of the art, but addressing individual information-carrying modes presents a significant experimental challenge. Here we demonstrate effective high-dimensional operations in the time-frequency domain of nonclassical light. We generate heralded photons with tailored temporal-mode structures through the pulse shaping of a broadband parametric down-conversion pump. We then implement a quantum pulse gate, enabled by dispersion-engineered sum-frequency generation, to project onto programmable temporal modes, reconstructing the quantum state in seven dimensions. We also manipulate the time-frequency structure by selectively removing temporal modes, explicitly demonstrating the effectiveness of engineered nonlinear processes for the mode-selective manipulation of quantum states.

  10. How do we interest students in science?

    NASA Astrophysics Data System (ADS)

    Murray, L.

    2016-02-01

    In today's world science literacy is now, more than ever, critical to society. However, today's technically savvy student tends to be bored by "cook-book" laboratory exercises and dated lecture style, which typifies the way that most science courses are taught. To enhance student interest in and understanding of the sciences, we developed two unique programs, in which teachers were provided with the tools and hands-on experience that enabled them to implement research- and inquiry-based projects with their students. The approach was based a framework that is student driven and enables active participation and innovation in the study of the environment. The framework involved selection of a theme and an activity that captured the interest of the participants, participant development of research or investigative questions based on the theme, experimentation to address the research questions, formulation of conclusions, and communication of these results. The projects consisted of two parts: a professional development institute for teachers and the classroom implementation of student research projects, both of which incorporated the framework process. The institutes focused on modeling the framework process, with teachers actively developing questions, researching the question, formulating results and conclusions. This method empowered teachers to be confident in the implementation of the process with their students. With support from project staff, teachers followed up by incorporating the method of teaching with their students. Evaluation results from the programs concluded that projects such as these can increase student interest in and understanding of the scientific process.

  11. PERSEUS QC: preparing statistic data sets

    NASA Astrophysics Data System (ADS)

    Belokopytov, Vladimir; Khaliulin, Alexey; Ingerov, Andrey; Zhuk, Elena; Gertman, Isaac; Zodiatis, George; Nikolaidis, Marios; Nikolaidis, Andreas; Stylianou, Stavros

    2017-09-01

    The Desktop Oceanographic Data Processing Module was developed for visual analysis of interdisciplinary cruise measurements. The program provides the possibility of data selection based on different criteria, map plotting, sea horizontal sections, and sea depth vertical profiles. The data selection in the area of interest can be specified according to a set of different physical and chemical parameters complimented by additional parameters, such as the cruise number, ship name, and time period. The visual analysis of a set of vertical profiles in the selected area allows to determine the quality of the data, their location and the time of the in-situ measurements and to exclude any questionable data from the statistical analysis. For each selected set of profiles, the average vertical profile, the minimal and maximal values of the parameter under examination and the root mean square (r.m.s.) are estimated. These estimates are compared with the parameter ranges, set for each sub-region by MEDAR/MEDATLAS-II and SeaDataNet2 projects. In the framework of the PERSEUS project, certain parameters which lacked a range were calculated from scratch, while some of the previously used ranges were re-defined using more comprehensive data sets based on SeaDataNet2, SESAME and PERSEUS projects. In some cases we have used additional sub- regions to redefine the ranges ore precisely. The recalculated ranges are used to improve the PERSEUS Data Quality Control.

  12. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    NASA Astrophysics Data System (ADS)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  13. The Systems Engineering Process for Human Support Technology Development

    NASA Technical Reports Server (NTRS)

    Jones, Harry

    2005-01-01

    Systems engineering is designing and optimizing systems. This paper reviews the systems engineering process and indicates how it can be applied in the development of advanced human support systems. Systems engineering develops the performance requirements, subsystem specifications, and detailed designs needed to construct a desired system. Systems design is difficult, requiring both art and science and balancing human and technical considerations. The essential systems engineering activity is trading off and compromising between competing objectives such as performance and cost, schedule and risk. Systems engineering is not a complete independent process. It usually supports a system development project. This review emphasizes the NASA project management process as described in NASA Procedural Requirement (NPR) 7120.5B. The process is a top down phased approach that includes the most fundamental activities of systems engineering - requirements definition, systems analysis, and design. NPR 7120.5B also requires projects to perform the engineering analyses needed to ensure that the system will operate correctly with regard to reliability, safety, risk, cost, and human factors. We review the system development project process, the standard systems engineering design methodology, and some of the specialized systems analysis techniques. We will discuss how they could apply to advanced human support systems development. The purpose of advanced systems development is not directly to supply human space flight hardware, but rather to provide superior candidate systems that will be selected for implementation by future missions. The most direct application of systems engineering is in guiding the development of prototype and flight experiment hardware. However, anticipatory systems engineering of possible future flight systems would be useful in identifying the most promising development projects.

  14. 7 CFR 1944.529 - Project selection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Project selection. 1944.529 Section 1944.529... selection. (a) Projects must meet the following criteria: (1) Provide a program of supervisory assistance as... section, the following criteria will be considered in the selection of grant recipients: (1) The extent to...

  15. A structured multi-stakeholder learning process for Sustainable Land Management.

    PubMed

    Schwilch, Gudrun; Bachmann, Felicitas; Valente, Sandra; Coelho, Celeste; Moreira, Jorge; Laouina, Abdellah; Chaker, Miloud; Aderghal, Mohamed; Santos, Patricia; Reed, Mark S

    2012-09-30

    There are many, often competing, options for Sustainable Land Management (SLM). Each must be assessed - and sometimes negotiated - prior to implementation. Participatory, multi-stakeholder approaches to identification and selection of SLM options are increasingly popular, often motivated by social learning and empowerment goals. Yet there are few practical tools for facilitating processes in which land managers may share, select, and decide on the most appropriate SLM options. The research presented here aims to close the gap between the theory and the practice of stakeholder participation/learning in SLM decision-making processes. The paper describes a three-part participatory methodology for selecting SLM options that was tested in 14 desertification-prone study sites within the EU-DESIRE project. Cross-site analysis and in-depth evaluation of the Moroccan and Portuguese sites were used to evaluate how well the proposed process facilitated stakeholder learning and selection of appropriate SLM options for local implementation. The structured nature of the process - starting with SLM goal setting - was found to facilitate mutual understanding and collaboration between stakeholders. The deliberation process led to a high degree of consensus over the outcome and, though not an initial aim, it fostered social learning in many cases. This solution-oriented methodology is applicable in a wide range of contexts and may be implemented with limited time and resources. Copyright © 2012 Elsevier Ltd. All rights reserved.

  16. COTS/CRS: KSC Evolving Host Initiatives with Commercial Space Partners

    NASA Technical Reports Server (NTRS)

    Yohpe, Megan

    2010-01-01

    NASA's Commercial Crew and Cargo Program Office (C3PO) leads the agency's commercial efforts to stimulate United States private companies as the shuttle program comes to a close. Through the Commercial Orbital Transportation Services (COTS) program, two companies, SpaceX and Orbital, were selected to demonstrate their ability to perform flights to the International Space Station. The Commercial Resupply Services (CRS) Project leverages off the COTS experience, and awarded these two private companies contracts to resupply the International Space Station after shuttle fly out. As a 2010 summer intern, I supported the COTS/CRS team in their team meetings, attended and contributed to project discussions and planning, and assisted in developing visual representations for the variety of processes and organizational endeavors required for the program to run smoothly. One aspect of the COTS/CRS program gives the involved private companies the opportunity to request available services from Kennedy Space Center (KSC); one of my projects included assisting in the development of a related Task Order Request (TOR) process. In addition, an integral part of the project was to maintain and enhance the team database for processing the variety of TORS. My experience in the project gave me great insight into the growing field of commercial space activities. The development of the TOR process involved coordinating representatives from a variety of backgrounds at KSC. A clear and concise visual representation of the TOR process in the form of a flow chart was necessary to successfully implement a task order request from one of NASA's commercial partners. The goals of the process charts were to communicate the team's ideas and foster a common thought process while at the same time allow the process to grow and evolve. It was critical that the requests from the private companies were addressed quickly and thoroughly as the process developed this summer is expected to have extensive future use.

  17. Method and System for Producing Full Motion Media to Display on a Spherical Surface

    NASA Technical Reports Server (NTRS)

    Starobin, Michael A. (Inventor)

    2015-01-01

    A method and system for producing full motion media for display on a spherical surface is described. The method may include selecting a subject of full motion media for display on a spherical surface. The method may then include capturing the selected subject as full motion media (e.g., full motion video) in a rectilinear domain. The method may then include processing the full motion media in the rectilinear domain for display on a spherical surface, such as by orienting the full motion media, adding rotation to the full motion media, processing edges of the full motion media, and/or distorting the full motion media in the rectilinear domain for instance. After processing the full motion media, the method may additionally include providing the processed full motion media to a spherical projection system, such as a Science on a Sphere system.

  18. Network models for solving the problem of multicriterial adaptive optimization of investment projects control with several acceptable technologies

    NASA Astrophysics Data System (ADS)

    Shorikov, A. F.; Butsenko, E. V.

    2017-10-01

    This paper discusses the problem of multicriterial adaptive optimization the control of investment projects in the presence of several technologies. On the basis of network modeling proposed a new economic and mathematical model and a method for solving the problem of multicriterial adaptive optimization the control of investment projects in the presence of several technologies. Network economic and mathematical modeling allows you to determine the optimal time and calendar schedule for the implementation of the investment project and serves as an instrument to increase the economic potential and competitiveness of the enterprise. On a meaningful practical example, the processes of forming network models are shown, including the definition of the sequence of actions of a particular investment projecting process, the network-based work schedules are constructed. The calculation of the parameters of network models is carried out. Optimal (critical) paths have been formed and the optimal time for implementing the chosen technologies of the investment project has been calculated. It also shows the selection of the optimal technology from a set of possible technologies for project implementation, taking into account the time and cost of the work. The proposed model and method for solving the problem of managing investment projects can serve as a basis for the development, creation and application of appropriate computer information systems to support the adoption of managerial decisions by business people.

  19. Ames Engineering Directorate

    NASA Technical Reports Server (NTRS)

    Phillips, Veronica J.

    2017-01-01

    The Ames Engineering Directorate is the principal engineering organization supporting aerospace systems and spaceflight projects at NASA's Ames Research Center in California's Silicon Valley. The Directorate supports all phases of engineering and project management for flight and mission projects-from R&D to Close-out-by leveraging the capabilities of multiple divisions and facilities.The Mission Design Center (MDC) has full end-to-end mission design capability with sophisticated analysis and simulation tools in a collaborative concurrent design environment. Services include concept maturity level (CML) maturation, spacecraft design and trades, scientific instruments selection, feasibility assessments, and proposal support and partnerships. The Engineering Systems Division provides robust project management support as well as systems engineering, mechanical and electrical analysis and design, technical authority and project integration support to a variety of programs and projects across NASA centers. The Applied Manufacturing Division turns abstract ideas into tangible hardware for aeronautics, spaceflight and science applications, specializing in fabrication methods and management of complex fabrication projects. The Engineering Evaluation Lab (EEL) provides full satellite or payload environmental testing services including vibration, temperature, humidity, immersion, pressure/altitude, vacuum, high G centrifuge, shock impact testing and the Flight Processing Center (FPC), which includes cleanrooms, bonded stores and flight preparation resources. The Multi-Mission Operations Center (MMOC) is composed of the facilities, networks, IT equipment, software and support services needed by flight projects to effectively and efficiently perform all mission functions, including planning, scheduling, command, telemetry processing and science analysis.

  20. An expert panel process to evaluate habitat restoration actions in the Columbia River estuary.

    PubMed

    Krueger, Kirk L; Bottom, Daniel L; Hood, W Gregory; Johnson, Gary E; Jones, Kim K; Thom, Ronald M

    2017-03-01

    We describe a process for evaluating proposed ecosystem restoration projects intended to improve survival of juvenile salmon in the Columbia River estuary (CRE). Changes in the Columbia River basin (northwestern USA), including hydropower development, have contributed to the listing of 13 salmon stocks as endangered or threatened under the U.S. Endangered Species Act. Habitat restoration in the CRE, from Bonneville Dam to the ocean, is part of a basin-wide, legally mandated effort to mitigate federal hydropower impacts on salmon survival. An Expert Regional Technical Group (ERTG) was established in 2009 to improve and implement a process for assessing and assigning "survival benefit units" (SBUs) to restoration actions. The SBU concept assumes site-specific restoration projects will increase juvenile salmon survival during migration through the 234 km CRE. Assigned SBUs are used to inform selection of restoration projects and gauge mitigation progress. The ERTG standardized the SBU assessment process to improve its scientific integrity, repeatability, and transparency. In lieu of experimental data to quantify the survival benefits of individual restoration actions, the ERTG adopted a conceptual model composed of three assessment criteria-certainty of success, fish opportunity improvements, and habitat capacity improvements-to evaluate restoration projects. Based on these criteria, an algorithm assigned SBUs by integrating potential fish density as an indicator of salmon performance. Between 2009 and 2014, the ERTG assessed SBUs for 55 proposed projects involving a total of 181 restoration actions located across 8 of 9 reaches of the CRE, largely relying on information provided in a project template based on the conceptual model, presentations, discussions with project sponsors, and site visits. Most projects restored tidal inundation to emergent wetlands, improved riparian function, and removed invasive vegetation. The scientific relationship of geomorphic and salmonid responses to restoration actions remains the foremost concern. Although not designed to establish a broad strategy for estuary restoration, the scoring process has adaptively influenced the types, designs, and locations of restoration proposals. The ERTG process may be a useful model for others who have unique ecosystem restoration goals and share some of our common challenges. Copyright © 2016 Elsevier Ltd. All rights reserved.

  1. Dual-track CCS stakeholder engagement: Lessons learned from FutureGen in Illinois

    USGS Publications Warehouse

    Hund, G.; Greenberg, S.E.

    2011-01-01

    FutureGen, as originally planned, was to be the world's first coal-fueled, near-zero emissions power plant with fully integrated, 90% carbon capture and storage (CCS). From conception through siting and design, it enjoyed strong support from multiple stakeholder groups, which benefited the overall project. Understanding the stakeholder engagement process for this project provides valuable insights into the design of stakeholder programs for future CCS projects. FutureGen is one of few projects worldwide that used open competition for siting both the power plant and storage reservoir. Most site proposals were coordinated by State governments. It was unique in this and other respects relative to the site selection method used on other DOE-supported projects. At the time of site selection, FutureGen was the largest proposed facility designed to combine an integrated gasification combined cycle (IGCC) coal-fueled power plant with a CCS system. Stakeholder engagement by states and the industry consortium responsible for siting, designing, building, and operating the facility took place simultaneously and on parallel tracks. On one track were states spearheading state-wide site assessments to identify candidate sites that they wanted to propose for consideration. On the other track was a public-private partnership between an industry consortium of thirteen coal companies and electric utilities that comprised the FutureGen Alliance (Alliance) and the U.S. Department of Energy (DOE). The partnership was based on a cooperative agreement signed by both parties, which assigned the lead for siting to the Alliance. This paper describes the stakeholder engagement strategies used on both of these tracks and provides examples from the engagement process using the Illinois semi-finalist sites. ?? 2011 Published by Elsevier Ltd.

  2. Application of Rapid Prototyping to the Investment Casting of Test Hardware (MSFC Center Director's Discretionary Fund Final Report, Project No. 98-08)

    NASA Technical Reports Server (NTRS)

    Cooper, K. G.; Wells, D.

    2000-01-01

    Investment casting masters of a selected propulsion hardware component, a fuel pump housing, were rapid prototyped on the several processes in-house, along with the new Z-Corp process acquired through this project. Also, tensile samples were prototyped and cast using the same significant parameters. The models were then shelled in-house using a commercial grade zircon-based slurry and stucco technique. Next, the shelled models were fired and cast by our in-house foundry contractor (IITRI), with NASA-23, a commonly used test hardware metal. The cast models are compared by their surface finish and overall appearance (i.e., the occurrence of pitting, warping, etc.), as well as dimensional accuracy.

  3. Use of consumer insight in the new product development process in the meat sector.

    PubMed

    Grunert, Klaus G; Verbeke, Wim; Kügler, Jens O; Saeed, Faiza; Scholderer, Joachim

    2011-11-01

    Successful new product development requires input from the market throughout the product development process, from identification of opportunities via screening of ideas, development of concepts, development of physical prototypes and to launch. Drawing on work done in the EU FP6 projects PROSAFEBEEF and Q-PORKCHAINS and a Danish project, all dealing with new product development in the meat sector, it is shown how the use of consumer insight techniques can a) support the identification of market opportunities, b) make sure that technologies applied are acceptable to consumers, c) aid the selection and optimisation of new product concepts and related communication, and d) be used to test product prototypes before final launch. Copyright © 2011 Elsevier Ltd. All rights reserved.

  4. The application of remote sensing to resource management and environmental quality programs in Kansas

    NASA Technical Reports Server (NTRS)

    Barr, B. G.; Martinko, E. A. (Principal Investigator)

    1982-01-01

    Capabilities to process data for state agencies in Kansas were upgraded through the vehicle of a low cost data processing system. Short term projects in which agencies identified areas of immediate needs, and longer terms projects, continued from previous years, are described including studies of Arkansas River irrigation; evaluation of rangeland in the Cimarron National Grassland; a model of the Walnut Creek watershed groundwater; selection of a pronghorn antelope release site; the establishment of a geographical data base for tax reassessment in Finney County; a land use/land cover inventory and hazards assessment; and applied R & D in agricultural remote sensing. The topics discussed at a short course in remote sensing and publications are listed.

  5. Content Analysis Schedule for Bilingual Education Programs: BICEP Intercambio de la Cultura.

    ERIC Educational Resources Information Center

    Shore, Marietta Saravia; Nafus, Charles

    This content analysis schedule for BICEP Intercambio de la Cultura (San Bernardino, California), presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  6. Changing Adolescents' Attitudes Toward Nontraditional Career Choices: An Intervention Process.

    ERIC Educational Resources Information Center

    Veres, Helen C.; Carmichael, Mary Margaret

    An intervention project was conducted to determine if affirmative action strategies had an effect on promoting nontraditional program and course selection among 460 eighth and tenth grade students from urban, suburban, and rural communities in New York. The groups, about half male and half female, were divided into a control group and an…

  7. myPhyloDB: a local web server for the storage and analysis of metagenomics data

    USDA-ARS?s Scientific Manuscript database

    myPhyloDB is a user-friendly personal database with a browser-interface designed to facilitate the storage, processing, analysis, and distribution of metagenomics data. MyPhyloDB archives raw sequencing files, and allows for easy selection of project(s)/sample(s) of any combination from all availab...

  8. 32 CFR 37.1020 - What must I document in my award file?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... commercial benefits that should result from the project supported by the TIA. If the recipient is a... collaboration. (b) Describe the process that led to the award of the TIA, including how you and program officials solicited and evaluated proposals and selected the one supported through the TIA. (c) Explain how...

  9. 34 CFR 636.21 - What selection criteria does the Secretary use to evaluate an application?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Agencies of local government. (ii) Public and private elementary and secondary schools. (iii) Business... implementation strategy for each key project component activity is— (i) Comprehensive; (ii) Based on a sound... operation; (5) Describe a time-line chart that relates key evaluation processes and benchmarks to other...

  10. 34 CFR 636.21 - What selection criteria does the Secretary use to evaluate an application?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Agencies of local government. (ii) Public and private elementary and secondary schools. (iii) Business... implementation strategy for each key project component activity is— (i) Comprehensive; (ii) Based on a sound... operation; (5) Describe a time-line chart that relates key evaluation processes and benchmarks to other...

  11. 34 CFR 636.21 - What selection criteria does the Secretary use to evaluate an application?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Agencies of local government. (ii) Public and private elementary and secondary schools. (iii) Business... implementation strategy for each key project component activity is— (i) Comprehensive; (ii) Based on a sound... operation; (5) Describe a time-line chart that relates key evaluation processes and benchmarks to other...

  12. 34 CFR 636.21 - What selection criteria does the Secretary use to evaluate an application?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Agencies of local government. (ii) Public and private elementary and secondary schools. (iii) Business... implementation strategy for each key project component activity is— (i) Comprehensive; (ii) Based on a sound... operation; (5) Describe a time-line chart that relates key evaluation processes and benchmarks to other...

  13. Choosing at School: A Model of Decisionmaking Behaviour within Compulsory Education

    ERIC Educational Resources Information Center

    White, Patrick

    2007-01-01

    This paper presents selected findings from an ESRC-funded research project examining the choices and occupational aspirations of 59 students approaching the end of their compulsory schooling. It concentrates on the development of a choice model conceptualising the decisionmaking processes of the young people involved in the study, whilst avoiding…

  14. 34 CFR 377.3 - What types of activities may the Secretary fund?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CLIENT CHOICE PROGRAM General § 377.3 What types of activities may the Secretary fund? The Secretary... eligible clients in the rehabilitation process as follows: (a) At a minimum, all projects must demonstrate effective ways to increase the choices available to clients in selecting goals, services, and providers of...

  15. An Optimal Program Initiative Selection Model for USMC Program Objective Memorandum Planning

    DTIC Science & Technology

    1993-03-01

    Programming, Master’s Thesis, Naval Postgraduate School, Monterey, CA, September, 1992. 7. Anderson, S.M., Captain, USA, A Goal Programming R&D Project Funding ... Model of the U.S. Army Strategic Defense Command Using the Analytic Hierarchy Process, Master’s Thesis, Naval Postgraduate School, Monterey, CA

  16. Environmental Impact Analysis Process. Deployment Area Selection and Land Withdrawal/Acquisition DEIS. Chapter V. Appendices.

    DTIC Science & Technology

    1980-12-01

    Analysis of the White Pine Power Project. Bureau of Business and Economic Research, University of Nevada, Reno. Basile , J. V., and T. N. Lonner, 1979...Suspected of Pesticide Poisoning. Avian Diseases 18:487-489. Resource Area, Nye County, Nevada. Bureau of Land Management, Battle Mountain District. Rhoads, W

  17. Content Analysis Schedule for Bilingual Education Programs: Albuquerque Public School Bicultural-Bilingual Program.

    ERIC Educational Resources Information Center

    Hess, Richard T.; And Others

    This content analysis schedule for the Albuquerque (New Mexico) Public School Bicultural-Bilingual Program presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and…

  18. Foundations that Provide Support for Human Services: A Selected List.

    ERIC Educational Resources Information Center

    Smith, Bertha, Comp.

    Lists of foundations can aid the user in securing funding sources for projects in the areas of health, education, community development and/or social services. The user is cautioned that grantsmanship is a competitive process; grants application procedures vary from one foundation to another. In the absence of any specific guidelines, important…

  19. Making Total Quality Management + Just-in-Time Manufacturing Work.

    ERIC Educational Resources Information Center

    Waldrop, Phillip S.; Scott, Thomas E.

    2000-01-01

    In one case study, teamwork was implemented in mainstream production; in a second, teamwork was applied to an ad hoc project. The cases show that process technologies and management strategies such as just-in-time are not enough; selection of the appropriate mix of individuals with complementary traits is crucial. (SK)

  20. Developing an Information Literacy Assessment Rubric: A Case Study of Collaboration, Process, and Outcomes

    ERIC Educational Resources Information Center

    Gola, Christina H.; Ke, Irene; Creelman, Kerry M.; Vaillancourt, Shawn P.

    2014-01-01

    A team of four librarians at the University of Houston (UH) Libraries partnered with the UH Office of Institutional Effectiveness and its Director of Assessment and Accreditation Services for General Education to conduct a campus-wide, exploratory assessment of undergraduate information literacy skills. The project evaluated a selection of…

  1. Adding Dimension to Evaluative Research Through the Use of Protocol Material.

    ERIC Educational Resources Information Center

    Tittle, Carol Kehr

    A rationale and illustration of the use of original records or protocol materials in an evaluation research report are described. Records of school observations and audiotape transcripts were selected to represent the concepts or categories which were developed in the process of evaluation. These qualitative data were collected in a project which…

  2. Critical Thinking in Wikibook Creation with Enhanced and Minimal Scaffolds

    ERIC Educational Resources Information Center

    Kim, Nari

    2015-01-01

    The purpose of the study was to investigate how to scaffold students' critical thinking skills in the process of co-writing and co-reflection of wikibooks in formal learning contexts. To observe critical thinking skills in wiki collaborations under different levels of instructional guidance, two graduate wikibook projects were selected: an…

  3. Going Up

    NASA Technical Reports Server (NTRS)

    Douglas, Freddie, III

    2004-01-01

    The accelerated Leadership Option (ALO) combines business management and systems engineering studies at the Massachusetts Institute of Technology (MIT) culminating in a Master of Science degree, with a one year developmental assignment. The program accelerates the development process of exceptionally promising project leaders to positions of increased responsibility. Participants are selected because of technical expertise and proven leadership abilities.

  4. Where and Why There? Spatial Thinking with Geographic Information Systems

    ERIC Educational Resources Information Center

    Milson, Andrew J.; Curtis, Mary D.

    2009-01-01

    The authors developed and implemented a project for high school geography students that modeled the processes in a site selection analysis using Geographic Information Systems (GIS). They sought to explore how spatial thinking could be fostered by using the MyWorld GIS software that was designed specifically for educational uses. The task posed…

  5. Market study phase 2 follow-up activity. The Baylor Mark 3 Haploscope

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Efforts to accelerate commercialization of the haploscope, and to determine quickly and reliably the level of manufacturer interest in the product are presented. The nature of the decision making process within firms as it concerns project selection and new product evaluation is discussed. Implications for the NASA marketing program were assessed.

  6. The Filtered Abel Transform and Its Application in Combustion Diagnostics

    NASA Technical Reports Server (NTRS)

    Simons, Stephen N. (Technical Monitor); Yuan, Zeng-Guang

    2003-01-01

    Many non-intrusive combustion diagnosis methods generate line-of-sight projections of a flame field. To reconstruct the spatial field of the measured properties, these projections need to be deconvoluted. When the spatial field is axisymmetric, commonly used deconvolution method include the Abel transforms, the onion peeling method and the two-dimensional Fourier transform method and its derivatives such as the filtered back projection methods. This paper proposes a new approach for performing the Abel transform method is developed, which possesses the exactness of the Abel transform and the flexibility of incorporating various filters in the reconstruction process. The Abel transform is an exact method and the simplest among these commonly used methods. It is evinced in this paper that all the exact reconstruction methods for axisymmetric distributions must be equivalent to the Abel transform because of its uniqueness and exactness. Detailed proof is presented to show that the two dimensional Fourier methods when applied to axisymmetric cases is identical to the Abel transform. Discrepancies among various reconstruction method stem from the different approximations made to perform numerical calculations. An equation relating the spectrum of a set of projection date to that of the corresponding spatial distribution is obtained, which shows that the spectrum of the projection is equal to the Abel transform of the spectrum of the corresponding spatial distribution. From the equation, if either the projection or the distribution is bandwidth limited, the other is also bandwidth limited, and both have the same bandwidth. If the two are not bandwidth limited, the Abel transform has a bias against low wave number components in most practical cases. This explains why the Abel transform and all exact deconvolution methods are sensitive to high wave number noises. The filtered Abel transform is based on the fact that the Abel transform of filtered projection data is equal to an integral transform of the original projection data with the kernel function being the Abel transform of the filtering function. The kernel function is independent of the projection data and can be obtained separately when the filtering function is selected. Users can select the best filtering function for a particular set of experimental data. When the kernal function is obtained, it can be used repeatedly to a number of projection data sets (rovs) from the same experiment. When an entire flame image that contains a large number of projection lines needs to be processed, the new approach significantly reduces computational effort in comparison with the conventional approach in which each projection data set is deconvoluted separately. Computer codes have been developed to perform the filter Abel transform for an entire flame field. Measured soot volume fraction data of a jet diffusion flame are processed as an example.

  7. Ethical considerations related to participation and partnership: an investigation of stakeholders' perceptions of an action-research project on user fee removal for the poorest in Burkina Faso.

    PubMed

    Hunt, Matthew R; Gogognon, Patrick; Ridde, Valéry

    2014-02-20

    Healthcare user fees present an important barrier for accessing services for the poorest (indigents) in Burkina Faso and selective removal of fees has been incorporated in national healthcare planning. However, establishing fair, effective and sustainable mechanisms for the removal of user fees presents important challenges. A participatory action-research project was conducted in Ouargaye, Burkina Faso, to test mechanisms for identifying those who are indigents, and funding and implementing user fee removal. In this paper, we explore stakeholder perceptions of ethical considerations relating to participation and partnership arising in the action-research. We conducted 39 in-depth interviews to examine ethical issues associated with the action-research. Respondents included 14 individuals identified as indigent through the community selection process, seven members of village selection committees, six local healthcare professionals, five members of the management committees of local health clinics, five members of the research team, and four regional or national policy-makers. Using constant comparative techniques, we carried out an inductive thematic analysis of the collected data. The Ouargaye project involved a participatory model, included both implementation and research components, and focused on a vulnerable group within small, rural communities. Stakeholder perceptions and experiences relating to the participatory approach and reliance on multiple partnerships in the project were associated with a range of ethical considerations related to 1) seeking common ground through communication and collaboration, 2) community participation and risk of stigmatization, 3) impacts of local funding of the user fee removal, 4) efforts to promote fairness in the selection of the indigents, and 5) power relations and the development of partnerships. This investigation of the Ouargaye project serves to illuminate the distinctive ethical terrain of a participatory public health action-research project. In carrying out such projects, careful attention and effort is needed to establish and maintain respectful relationships amongst those involved, acknowledge and address differences of power and position, and evaluate burdens and risks for individuals and groups.

  8. Ethical considerations related to participation and partnership: an investigation of stakeholders’ perceptions of an action-research project on user fee removal for the poorest in Burkina Faso

    PubMed Central

    2014-01-01

    Background Healthcare user fees present an important barrier for accessing services for the poorest (indigents) in Burkina Faso and selective removal of fees has been incorporated in national healthcare planning. However, establishing fair, effective and sustainable mechanisms for the removal of user fees presents important challenges. A participatory action-research project was conducted in Ouargaye, Burkina Faso, to test mechanisms for identifying those who are indigents, and funding and implementing user fee removal. In this paper, we explore stakeholder perceptions of ethical considerations relating to participation and partnership arising in the action-research. Methods We conducted 39 in-depth interviews to examine ethical issues associated with the action-research. Respondents included 14 individuals identified as indigent through the community selection process, seven members of village selection committees, six local healthcare professionals, five members of the management committees of local health clinics, five members of the research team, and four regional or national policy-makers. Using constant comparative techniques, we carried out an inductive thematic analysis of the collected data. Results The Ouargaye project involved a participatory model, included both implementation and research components, and focused on a vulnerable group within small, rural communities. Stakeholder perceptions and experiences relating to the participatory approach and reliance on multiple partnerships in the project were associated with a range of ethical considerations related to 1) seeking common ground through communication and collaboration, 2) community participation and risk of stigmatization, 3) impacts of local funding of the user fee removal, 4) efforts to promote fairness in the selection of the indigents, and 5) power relations and the development of partnerships. Conclusions This investigation of the Ouargaye project serves to illuminate the distinctive ethical terrain of a participatory public health action-research project. In carrying out such projects, careful attention and effort is needed to establish and maintain respectful relationships amongst those involved, acknowledge and address differences of power and position, and evaluate burdens and risks for individuals and groups. PMID:24555854

  9. Demonstration of Advanced CO 2 Capture Process Improvements for Coal-Fired Flue Gas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carroll, John

    This document summarizes the activities of Cooperative Agreement DE-FE0026590, “Demonstration of Advanced CO 2 Capture Process Improvements for Coal-Fired Flue Gas” during the performance period of October 1, 2015 through May 31, 2017. This project was funded by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL). Southern Company Services, Inc. (SCS) was the prime contractor and co-funder of the project. Mitsubishi Heavy Industries America (MHIA) and AECOM were project team members. The overall project objective was to improve costs, energy requirements, and performance of an existing amine-based CO 2 capture process. This will occur via improvements inmore » three areas: 1. Reboiler design – The first objective of the program was to demonstrate performance of an integrated stripper/reboiler (termed Built-in Reboiler, or BIR) to reduce footprint, capital costs, and integration issues of the current technology. 2. Particulate management – The second objective was to carry out a Particulate Matter Management (PMM) test. This has the potential to reduce operating costs and capital costs due to the reduced or eliminated need for mechanical filtration. 3. Solvent – The third objective was to carry out a new solvent test plan (referred to as NSL) to demonstrate a new solvent (termed New Solvent A), which is expected to reduce regeneration steam. The bulk price is also expected to be lower than KS-1, which is the current solvent used in this process. NSL testing would include baseline testing, optimization, long term testing, solvent reclamation testing, and final inspection. These combine to form the Advanced Carbon Capture (ACC) technology. Much of this work will be applicable to generic solvent processes, especially in regards to improved reboiler design, and focused to meet or exceed the DOE’s overall carbon capture performance goals of 90% CO 2 capture rate with 95% CO 2 purity at a cost of $40/tonne of CO 2 by 2025 and at a cost of electricity (COE) 30% less than baseline CO 2 capture approaches by 2030. This project was divided into two phases. Phase 1 is the planning phase, and Phase 2 is the construction, operations, testing, and analysis phase. A down select occurred after Phase 1. Phase 1 activities were carried out during this reporting period, and therefore, Phase 1 activities are solely considered in this report. The project was not selected for Phase 2 funding.« less

  10. Olfactory Bulb Deep Short-Axon Cells Mediate Widespread Inhibition of Tufted Cell Apical Dendrites.

    PubMed

    Burton, Shawn D; LaRocca, Greg; Liu, Annie; Cheetham, Claire E J; Urban, Nathaniel N

    2017-02-01

    In the main olfactory bulb (MOB), the first station of sensory processing in the olfactory system, GABAergic interneuron signaling shapes principal neuron activity to regulate olfaction. However, a lack of known selective markers for MOB interneurons has strongly impeded cell-type-selective investigation of interneuron function. Here, we identify the first selective marker of glomerular layer-projecting deep short-axon cells (GL-dSACs) and investigate systematically the structure, abundance, intrinsic physiology, feedforward sensory input, neuromodulation, synaptic output, and functional role of GL-dSACs in the mouse MOB circuit. GL-dSACs are located in the internal plexiform layer, where they integrate centrifugal cholinergic input with highly convergent feedforward sensory input. GL-dSAC axons arborize extensively across the glomerular layer to provide highly divergent yet selective output onto interneurons and principal tufted cells. GL-dSACs are thus capable of shifting the balance of principal tufted versus mitral cell activity across large expanses of the MOB in response to diverse sensory and top-down neuromodulatory input. The identification of cell-type-selective molecular markers has fostered tremendous insight into how distinct interneurons shape sensory processing and behavior. In the main olfactory bulb (MOB), inhibitory circuits regulate the activity of principal cells precisely to drive olfactory-guided behavior. However, selective markers for MOB interneurons remain largely unknown, limiting mechanistic understanding of olfaction. Here, we identify the first selective marker of a novel population of deep short-axon cell interneurons with superficial axonal projections to the sensory input layer of the MOB. Using this marker, together with immunohistochemistry, acute slice electrophysiology, and optogenetic circuit mapping, we reveal that this novel interneuron population integrates centrifugal cholinergic input with broadly tuned feedforward sensory input to modulate principal cell activity selectively. Copyright © 2017 the authors 0270-6474/17/371117-22$15.00/0.

  11. Technology transfer for adaptation

    NASA Astrophysics Data System (ADS)

    Biagini, Bonizella; Kuhl, Laura; Gallagher, Kelly Sims; Ortiz, Claudia

    2014-09-01

    Technology alone will not be able to solve adaptation challenges, but it is likely to play an important role. As a result of the role of technology in adaptation and the importance of international collaboration for climate change, technology transfer for adaptation is a critical but understudied issue. Through an analysis of Global Environment Facility-managed adaptation projects, we find there is significantly more technology transfer occurring in adaptation projects than might be expected given the pessimistic rhetoric surrounding technology transfer for adaptation. Most projects focused on demonstration and early deployment/niche formation for existing technologies rather than earlier stages of innovation, which is understandable considering the pilot nature of the projects. Key challenges for the transfer process, including technology selection and appropriateness under climate change, markets and access to technology, and diffusion strategies are discussed in more detail.

  12. Afraid to Start Because the Outcome is Uncertain?: Social Site Characterization as a Tool for Informing Public Engagement Efforts

    USGS Publications Warehouse

    Wade, S.; Greenberg, S.

    2009-01-01

    This paper introduces the concept of social site characterization as a parallel effort to technical site characterization to be used in evaluating and planning carbon dioxides capture and storage (CCS) projects. Social site characterization, much like technical site characterization, relies on a series of iterative investigations into public attitudes towards a CCS project and the factors that will shape those views. This paper also suggests ways it can be used to design approaches for actively engaging stakeholders and communities in the deployment of CCS projects. This work is informed by observing the site selection process for FutureGen and the implementation of research projects under the Regional Carbon Sequestration Partnership Program. ?? 2009 Elsevier Ltd. All rights reserved.

  13. Image processing methods in two and three dimensions used to animate remotely sensed data. [cloud cover

    NASA Technical Reports Server (NTRS)

    Hussey, K. J.; Hall, J. R.; Mortensen, R. A.

    1986-01-01

    Image processing methods and software used to animate nonimaging remotely sensed data on cloud cover are described. Three FORTRAN programs were written in the VICAR2/TAE image processing domain to perform 3D perspective rendering, to interactively select parameters controlling the projection, and to interpolate parameter sets for animation images between key frames. Operation of the 3D programs and transferring the images to film is automated using executive control language and custom hardware to link the computer and camera.

  14. The Study of the Relationship between Probabilistic Design and Axiomatic Design Methodology. Volume 1

    NASA Technical Reports Server (NTRS)

    Onwubiko, Chinyere; Onyebueke, Landon

    1996-01-01

    This program report is the final report covering all the work done on this project. The goal of this project is technology transfer of methodologies to improve design process. The specific objectives are: 1. To learn and understand the Probabilistic design analysis using NESSUS. 2. To assign Design Projects to either undergraduate or graduate students on the application of NESSUS. 3. To integrate the application of NESSUS into some selected senior level courses in Civil and Mechanical Engineering curricula. 4. To develop courseware in Probabilistic Design methodology to be included in a graduate level Design Methodology course. 5. To study the relationship between the Probabilistic design methodology and Axiomatic design methodology.

  15. A Methodology for Successful MIS Projects

    PubMed Central

    Jacobs, Patt

    1988-01-01

    St. Vincent Hospital and Medical Center (SVHMC) was one of the Pacific Northwests' first hospitals to install a Medical Information System (MIS). In mid 1985 the hospital was confronted with the fact that vendor support of its MIS would be withdrawn in the near future. In 21 months a complete, fully operational MIS had to be selected, installed, and implemented. MIS projects are large, complicated sets of interrelated tasks organized to achieve a specific goal for an organization. Project management requires a sound methodology to deliver proper and necessary functions, on time, within budget, and that meet user expectations. This paper focuses on the process used to deliver the SIMON System on time and 15% under budget.

  16. 76 FR 68257 - Letters of Interest for Credit Assistance Under the Transportation Infrastructure Finance and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-03

    ...The DOT's TIFIA Joint Program Office (JPO) announces the availability of a limited amount of funding in Fiscal Year (FY) 2012 to provide credit assistance. Under TIFIA, the DOT provides secured (direct) loans, lines of credit, and loan guarantees to public and private applicants for eligible surface transportation projects of regional or national significance. Projects must meet statutorily specified criteria to be selected for credit assistance. Because demand for the TIFIA program exceeds budgetary resources, the DOT is utilizing periodic fixed-date solicitations. This notice outlines the process that project sponsors must follow to compete to secure an invitation for Federal credit assistance for Federal FY 2012.

  17. Large Scale Analyses and Visualization of Adaptive Amino Acid Changes Projects.

    PubMed

    Vázquez, Noé; Vieira, Cristina P; Amorim, Bárbara S R; Torres, André; López-Fernández, Hugo; Fdez-Riverola, Florentino; Sousa, José L R; Reboiro-Jato, Miguel; Vieira, Jorge

    2018-03-01

    When changes at few amino acid sites are the target of selection, adaptive amino acid changes in protein sequences can be identified using maximum-likelihood methods based on models of codon substitution (such as codeml). Although such methods have been employed numerous times using a variety of different organisms, the time needed to collect the data and prepare the input files means that tens or hundreds of coding regions are usually analyzed. Nevertheless, the recent availability of flexible and easy to use computer applications that collect relevant data (such as BDBM) and infer positively selected amino acid sites (such as ADOPS), means that the entire process is easier and quicker than before. However, the lack of a batch option in ADOPS, here reported, still precludes the analysis of hundreds or thousands of sequence files. Given the interest and possibility of running such large-scale projects, we have also developed a database where ADOPS projects can be stored. Therefore, this study also presents the B+ database, which is both a data repository and a convenient interface that looks at the information contained in ADOPS projects without the need to download and unzip the corresponding ADOPS project file. The ADOPS projects available at B+ can also be downloaded, unzipped, and opened using the ADOPS graphical interface. The availability of such a database ensures results repeatability, promotes data reuse with significant savings on the time needed for preparing datasets, and effortlessly allows further exploration of the data contained in ADOPS projects.

  18. A case study of resources management planning with multiple objectives and projects

    NASA Astrophysics Data System (ADS)

    Peterson, David L.; Silsbee, David G.; Schmoldt, Daniel L.

    1994-09-01

    Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decision-making tools. We have previously described a multiple objective planning process for inventory and monitoring programs (Schmoldt and others 1994). To test the applicability of that process for the more general needs of resources management planning, we conducted an exercise on the Olympic National Park (NP) in Washington State, USA. Eight projects were selected as typical of those considered in RMPs and five members of the Olympic NP staff used the analytic hierarchy process (AHP) to prioritize the eight projects with respect to their implicit management objectives. By altering management priorities for the park, three scenarios were generated. All three contained some similarities in rankings for the eight projects, as well as some differences. Mathematical allocations of money and people differed among these scenarios and differed substantially from what the actual 1990 Olympic NP RMP contains. Combining subjective priority measures with budget dollars and personnel time into an objective function creates a subjective economic metric for comparing different RMP’s. By applying this planning procedure, actual expenditures of budget and personnel in Olympic NP can agree more closely with the staff’s management objectives for the park.

  19. Developing a decision support system for R&D project portfolio selection with interdependencies

    NASA Astrophysics Data System (ADS)

    Ashrafi, Maryam; Davoudpour, Hamid; Abbassi, Mohammad

    2012-11-01

    Although investment in research and technology is a promising tool for technology centered organizations through obtaining their objectives, resource constraints make organizations select between their pool of research and technology projects through means of R&D project portfolio selection techniques mitigating corresponding risks and enhancing the overall value of project portfolio.

  20. 34 CFR 361.32 - Use of profitmaking organizations for on-the-job training in connection with selected projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... individuals with disabilities under the Projects With Industry program, 34 CFR part 379, if the designated... training in connection with selected projects. 361.32 Section 361.32 Education Regulations of the Offices... on-the-job training in connection with selected projects. The State plan must assure that the...

  1. Distillation Brine Purification for Resource Recovery Applications

    NASA Technical Reports Server (NTRS)

    Wheeler, Raymond M.

    2014-01-01

    Wastewater processing systems for space generate residual brine that contains water and salts that could be recovered to life support consumables. The project assessed the use of ion-exchange resins to selectively remove salts from wastewater treatment brines. The resins were then regenerated for additional use. The intention would be to generate a Na/K and CI rich or purified brine that would then be processed into high value chemicals, such as acids, bases, and/or bleach.

  2. Continuous quality improvement for continuity of care.

    PubMed

    Kibbe, D C; Bentz, E; McLaughlin, C P

    1993-03-01

    Continuous quality improvement (CQI) techniques have been used most frequently in hospital operations such as pharmaceutical ordering, patient admitting, and billing of insurers, and less often to analyze and improve processes that are close to the clinical interaction of physicians and their patients. This paper describes a project in which CQI was implemented in a family practice setting to improve continuity of care. A CQI study team was assembled in response to patients' complaints about not being able to see their regular physician providers when they wanted. Following CQI methods, the performance of the practice in terms of provider continuity was measured. Two "customer" groups were surveyed: physician faculty members were surveyed to assess their attitudes about continuity, and patients were surveyed about their preferences for provider continuity and convenience factors. Process improvements were selected in the critical pathways that influence provider continuity. One year after implementation of selected process improvements, repeat chart audit showed that provider continuity levels had improved from .45 to .74, a 64% increase from 1 year earlier. The project's main accomplishment was to establish the practicality of using CQI methods in a primary care setting to identify a quality issue of value to both providers and patients, in this case, continuity of provider care, and to identify processes that linked the performance of health care delivery procedures with patient expectations.

  3. The Future of the Space Age or how to Evaluate Innovative Ideas

    NASA Astrophysics Data System (ADS)

    Vollerthun, A.; Fricke, E.

    2002-05-01

    Based on an initiative of the German Aerospace Industry Association to foster a more transparent and structured funding of German commercial-oriented space projects a three-phased approach is suggested in this paper, to stepwise improve and evaluate proposed concepts for space-related innovations. The objective of this concept was to develop a transparent, structured, and reproducible process to select the right innovative project in terms of political, economical, and technical objectives for funding by e.g. a governmental agency. A stepwise process and related methods, that cover technical as well as economical aspects (and related sensitivities) are proposed. Based on the special needs and requirements of space industry the proposals are compared to a set of predefined top level objectives/requirements. Using an initial trades analysis with the criteria company, technology, product, and market, an initial business case is analyzed. The alternative innovative concepts are in the third process step subject to a very detailed analysis. The full economical and technical scale of the projects is evaluated and metrics for e.g. the 'Return on Investment' or 'Break Even Point' are determined, to compare the various innovations. Risks related to time, cost, and quality are considered, when performing sensitivity analysis by varying the most important factors of the project. Before discussing critical aspects of the proposed process, space-related examples will be presented to show how the process could be applied, and how different concepts should be evaluated.

  4. DOE-GO-14154-1 OHIO FINAL report Velocys 30Sept08

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Terry J. Mazanec

    2008-09-30

    The overall goal of the OHIO project was to develop a commercially viable high intensity process to produce ethylene by controlled catalytic reaction of ethane with oxygen in a microchannel reactor. Microchannel technology provides a breakthrough solution to the challenges identified in earlier development work on catalytic ethane oxidation. Heat and mass transfer limitations at the catalyst surface create destructively high temperatures that are responsible for increased production of waste products (CO, CO2, and CH4). The OHIO project focused on microscale energy and mass transfer management, designed to alleviate these transport limitations, thereby improving catalyst selectivity and saving energy-rich feedstock.more » The OHIO project evaluated ethane oxidation in small scale microchannel laboratory reactors including catalyst test units, and full commercial length single- and multi-channel reactors. Small scale catalyst and single channel results met target values for ethylene yields, demonstrating that the microchannel concept improves mass and heat transport compared to conventional reactors and results in improved ethylene yield. Earlier economic sensitivity studies of ethane oxidation processes suggested that only modest improvements were necessary to provide a system that provides significant feedstock, energy, and capital benefits compared to conventional steam ethane cracking. The key benefit derived from the OHIO process is energy savings. Ethylene production consumes more energy than any other U.S. chemical process.1 The OHIO process offers improved feedstock utilization and substantial energy savings due to a novel reaction pathway and the unique abilities of microchannel process technology to control the reaction temperature and other critical process parameters. Based on projected economic benefits of the process, the potential energy savings could reach 150 trillion Btu/yr by the year 2020, which is the equivalent of over 25 million barrels of oil.« less

  5. Managing IT service management implementation complexity: from the perspective of the Warfield Version of systems science

    NASA Astrophysics Data System (ADS)

    Wan, Jiangping; Jones, James D.

    2013-11-01

    The Warfield version of systems science supports a wide variety of application areas, and is useful to practitioners who use the work program of complexity (WPOC) tool. In this article, WPOC is applied to information technology service management (ITSM) for managing the complexity of projects. In discussing the application of WPOC to ITSM, we discuss several steps of WPOC. The discovery step of WPOC consists of a description process and a diagnosis process. During the description process, 52 risk factors are identified, which are then narrowed to 20 key risk factors. All of this is done by interviews and surveys. Root risk factors (the most basic risk factors) consist of 11 kinds of common 'mindbugs' which are selected from an interpretive structural model. This is achieved by empirical analysis of 25 kinds of mindbugs. (A lesser aim of this research is to affirm that these mindbugs developed from a Western mindset have corresponding relevance in a completely different culture: the Peoples Republic of China.) During the diagnosis process, the relationships among the root risk factors in the implementation of the ITSM project are identified. The resolution step of WPOC consists of a design process and an implementation process. During the design process, issues related to the ITSM application are compared to both e-Government operation and maintenance, and software process improvement. The ITSM knowledge support structure is also designed at this time. During the implementation process, 10 keys to the successful implementation of ITSM projects are identified.

  6. Region-to-area screening methodology for the Crystalline Repository Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1985-04-01

    The purpose of this document is to describe the Crystalline Repository Project's (CRP) process for region-to-area screening of exposed and near-surface crystalline rock bodies in the three regions of the conterminous United States where crystalline rock is being evaluated as a potential host for the second nuclear waste repository (i.e., in the North Central, Northeastern, and Southeastern Regions). This document indicates how the US Department of Energy's (DOE) General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories (10 CFR 960) were used to select and apply factors and variables for the region-to-area screening, explains how these factors andmore » variable are to be applied in the region-to-area screening, and indicates how this methodology relates to the decision process leading to the selection of candidate areas. A brief general discussion of the screening process from the national survey through area screening and site recommendation is presented. This discussion sets the scene for detailed discussions which follow concerning the region-to-area screening process, the guidance provided by the DOE Siting Guidelines for establishing disqualifying factors and variables for screening, and application of the disqualifying factors and variables in the screening process. This document is complementary to the regional geologic and environmental characterization reports to be issued in the summer of 1985 as final documents. These reports will contain the geologic and environmental data base that will be used in conjunction with the methodology to conduct region-to-area screening.« less

  7. Potential Alternatives Report for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes

    NASA Technical Reports Server (NTRS)

    Lewis, pattie

    2011-01-01

    Identifying and selecting alternative materials and technologies that have the potential to reduce the identified HazMats and hazardous air pollutants (HAPs), while incorporating sound corrosion prevention and control technologies, is a complicated task due to the fast pace at which new technologies emerge and rules change. The alternatives are identified through literature searches, electronic database and Internet searches, surveys, and/or personal and professional contacts. Available test data was then compiled on the proposed alternatives to determine if the materials meet the test objectives or if further)laboratory or field-testing will be required. After reviewing technical information documented in the PAR, government representatives, technical representatives from the affected facilities, and other stakeholders involved in the process will select the list of viable alternative coatings for consideration and testing under the project's Joint Test Protocol entitled Joint Test Protocol for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes and Field Test Plan entitled Field Evaluations Test Plan for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes, both prepared by ITB. Test results will be reported in a Joint Test Report upon completion oftesting. The selection rationale and conclusions are documented in this PAR. A cost benefit analysis will be prepared to quantify the estimated capital and process costs of coating alternatives and cost savings relative to the current coating processes, however, some initial cost data has been included in this PAR. For this coatings project, isocyanates, as found in aliphatic isocyanate polyurethanes, were identified as the target HazMat to be eliminated. Table 1-1 lists the target HazMats, the related process and application, current specifications, and affected programs.

  8. Legacy sample disposition project. Volume 2: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gurley, R.N.; Shifty, K.L.

    1998-02-01

    This report describes the legacy sample disposition project at the Idaho Engineering and Environmental Laboratory (INEEL), which assessed Site-wide facilities/areas to locate legacy samples and owner organizations and then characterized and dispositioned these samples. This project resulted from an Idaho Department of Environmental Quality inspection of selected areas of the INEEL in January 1996, which identified some samples at the Test Reactor Area and Idaho Chemical Processing Plant that had not been characterized and dispositioned according to Resource Conservation and Recovery Act (RCRA) requirements. The objective of the project was to manage legacy samples in accordance with all applicable environmentalmore » and safety requirements. A systems engineering approach was used throughout the project, which included collecting the legacy sample information and developing a system for amending and retrieving the information. All legacy samples were dispositioned by the end of 1997. Closure of the legacy sample issue was achieved through these actions.« less

  9. NASA TEERM Hexavalent Chrome Alternatives Projects

    NASA Technical Reports Server (NTRS)

    Kessel, Kurt; Rothgeb, Matt

    2011-01-01

    This slide presentation reviews the NASA project to select an alternative to hexavalent chrome in the aerospace industry. Included is a recent historic testing and research that the Agency has performed on (1) the external tank, (2) the shuttle orbiter, (3) the Shuttle Rocket Booster, and (4) the Space Shuttle Main Engine. Other related Technology Evaluation for Environmental Risk Mitigation (TEERM) projects are reviewed. The Phase I process of the project performed testing of alternatives the results are shown in a chart for different coating systems. International collaboration was also reviewed. Phase II involves further testing of pretreatment and primers for 6 and 12 months of exposure to conditions at Launch Pad and the beach. Further test were performed to characterize the life cycle corrosion of the space vehicles. A new task is described as a joint project with the Department of Defense to identify a Hex Chrome Free Coatings for Electronics.

  10. The book, the stories, the people: an ongoing dialogic narrative inquiry study combining a practice development project. Part 2: the practice development context.

    PubMed

    Grant, A; Biley, F C; Leigh-Phippard, H; Walker, H

    2012-12-01

    This paper is the second part of a two-article practice development report. It builds on the first part by introducing and discussing a Writing for Recovery practice development project, conducted at two UK sites. The paper begins by briefly describing the project within the context of helping mental health users, carers and survivors develop skills in creative writing in order to engage in the process of narrative re-storying in line with preferred identity. A selective overview of broad and focal background literature relevant to the project is then provided in order to position it within a values-based mental health nursing practice. Following this, the specific plan for running the project is briefly summarized, covering actual and anticipated ethical issues. The paper ends with a discussion of dissemination aims. © 2012 Blackwell Publishing.

  11. Regulatory requirements for nuclear power plant site selection in Malaysia-a review.

    PubMed

    Basri, N A; Hashim, S; Ramli, A T; Bradley, D A; Hamzah, K

    2016-12-01

    Malaysia has initiated a range of pre-project activities in preparation for its planned nuclear power programme. Clearly one of the first steps is the selection of sites that are deemed suitable for the construction and operation of a nuclear power plant. Here we outline the Malaysian regulatory requirements for nuclear power plant site selection, emphasizing details of the selection procedures and site characteristics needed, with a clear focus on radiation safety and radiation protection in respect of the site surroundings. The Malaysia Atomic Energy Licensing Board (AELB) site selection guidelines are in accord with those provided in International Atomic Energy Agency (IAEA) and United Stated Nuclear Regulatory Commission (USNRC) documents. To enhance the suitability criteria during selection, as well as to assist in the final decision making process, possible assessments using the site selection characteristics and information are proposed.

  12. SHynergie: Development of a virtual project laboratory for monitoring hydraulic stimulations

    NASA Astrophysics Data System (ADS)

    Renner, Jörg; Friederich, Wolfgang; Meschke, Günther; Müller, Thomas; Steeb, Holger

    2016-04-01

    Hydraulic stimulations are the primary means of developing subsurface reservoirs regarding the extent of fluid transport in them. The associated creation or conditioning of a system of hydraulic conduits involves a range of hydraulic and mechanical processes but also chemical reactions, such as dissolution and precipitation, may affect the stimulation result on time scales as short as hours. In the light of the extent and complexity of these processes, the steering potential for the operator of a stimulation critically depends on the ability to integrate the maximum amount of site-specific information with profound process understanding and a large spectrum of experience. We report on the development of a virtual project laboratory for monitoring hydraulic stimulations within the project SHynergie (http://www.ruhr-uni-bochum.de/shynergie/). The concept of the laboratory envisioned product that constitutes a preparing and accompanying rather than post-processing instrument ultimately accessible to persons responsible for a project over a web-repository. The virtual laboratory consists of a data base, a toolbox, and a model-building environment. Entries in the data base are of two categories. On the one hand, selected mineral and rock properties are provided from the literature. On the other hand, project-specific entries of any format can be made that are assigned attributes regarding their use in a stimulation problem at hand. The toolbox is interactive and allows the user to perform calculations of effective properties and simulations of different types (e.g., wave propagation in a reservoir, hydraulic test). The model component is also hybrid. The laboratory provides a library of models reflecting a range of scenarios but also allows the user to develop a site-specific model constituting the basis for simulations. The laboratory offers the option to use its components following the typical workflow of a stimulation project. The toolbox incorporates simulation instruments developed in the course of the SHynergie project that account for the experimental and modeling results of the various sub-projects.

  13. Final Project Report (Oct 2014-Dec 2017): Zeolite Membranes for Krypton/Xenon Separation from Spent Nuclear Fuel Reprocessing Off-Gas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kwon, Yeon Hye; Nair, Sankar; Bhave, Ramesh

    The overall focus of this project is to develop and understand SAPO-34 zeolitic membranes that can separate mixtures of radioisotope krypton-85 and xenon released as off-gases during used nuclear fuel recycling. The primary advantage of separating 85Kr from Xe is to reduce the volume of radioactive waste for storage. The second advantage is the revenue generated from the sale of high-purity Xe. Zeolite membranes are attractive because of their much lower energy requirements relative to cryogenic distillation, and their high resistance to radiation degradation. We report the detailed study of silicoaluminophosphate zeolite SAPO-34 materials and membranes for this application, duemore » to hypothesized favorable molecular sieving properties. In the 3-year Mission Support project, we developed a novel, high-performance, low-energy intensity, lower-cost zeolite membrane process for Kr/Xe separation during SNF processing; and investigated the underlying molecular adsorption and transport processes in both ‘idealized’ and ‘realistic’ operating conditions to develop reliable synthesis-structure-property relationships for such membranes. Adsorption and diffusion measurements on SAPO-34 crystals indicate their potential for use in Kr-Xe separation membranes, but also highlight competing effects of adsorption and diffusion selectivity. SAPO-34 membranes synthesized on α-alumina substrates via steam-assisted conversion seeding and hydrothermal growth are characterized in detail, with Kr permeances 26 GPU and ideal Kr/Xe selectivities >20 at 298 K after thickness reduction. Post-synthesis cation exchange shows large (>50%) increases in selectivity at ambient or slight sub-ambient conditions. In addition, we confirm that SAPO-34 membrane is stable under radiation exposure and the impact of radiation exposure on membrane performance would not be substantial. We also successfully synthesized hollow-fiber SAPO-34 membranes with the same performance levels as the disk-type and tubular membranes. This important development will allow a very compact and low-cost Kr/Xe separation system. Finally, a detailed process calculation for techno-economic analysis was performed by integrating Maxwell-Stefan model into cross-flow membrane system, in order to estimate the required number of membrane stages and the total cost.« less

  14. Comparative study of thermochemical processes for hydrogen production from biomass fuels.

    PubMed

    Biagini, Enrico; Masoni, Lorenzo; Tognotti, Leonardo

    2010-08-01

    Different thermochemical configurations (gasification, combustion, electrolysis and syngas separation) are studied for producing hydrogen from biomass fuels. The aim is to provide data for the production unit and the following optimization of the "hydrogen chain" (from energy source selection to hydrogen utilization) in the frame of the Italian project "Filiera Idrogeno". The project focuses on a regional scale (Tuscany, Italy), renewable energies and automotive hydrogen. Decentred and small production plants are required to solve the logistic problems of biomass supply and meet the limited hydrogen infrastructures. Different options (gasification with air, oxygen or steam/oxygen mixtures, combustion, electrolysis) and conditions (varying the ratios of biomass and gas input) are studied by developing process models with uniform hypothesis to compare the results. Results obtained in this work concern the operating parameters, process efficiencies, material and energetic needs and are fundamental to optimize the entire hydrogen chain. Copyright 2010 Elsevier Ltd. All rights reserved.

  15. ID card number detection algorithm based on convolutional neural network

    NASA Astrophysics Data System (ADS)

    Zhu, Jian; Ma, Hanjie; Feng, Jie; Dai, Leiyan

    2018-04-01

    In this paper, a new detection algorithm based on Convolutional Neural Network is presented in order to realize the fast and convenient ID information extraction in multiple scenarios. The algorithm uses the mobile device equipped with Android operating system to locate and extract the ID number; Use the special color distribution of the ID card, select the appropriate channel component; Use the image threshold segmentation, noise processing and morphological processing to take the binary processing for image; At the same time, the image rotation and projection method are used for horizontal correction when image was tilting; Finally, the single character is extracted by the projection method, and recognized by using Convolutional Neural Network. Through test shows that, A single ID number image from the extraction to the identification time is about 80ms, the accuracy rate is about 99%, It can be applied to the actual production and living environment.

  16. Kootenai River Floodplain Ecosystem Operational Loss Assessment, Protection, Mitigation and Rehabilitation, 2007-2008 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Merz, Norm

    2009-02-18

    The overarching goals of the 'Kootenai River Floodplain Ecosystem Operational Loss Assessment, Protection, Mitigation and Rehabilitation' Project (BPA Project No.2002-011-00) are to: (1) assess abiotic and biotic factors (i.e., geomorphologic, hydrological, aquatic and riparian/floodplain communities) in determining a definitive composition of ecological integrity, (2) develop strategies to assess and mitigate losses of ecosystem functions, and (3) produce a regional operational loss assessment framework. To produce a scientifically defensible, repeatable, and complete assessment tool, KTOI assembled a team of top scientists in the fields of hydrology, hydraulics, ornithology, entomology, statistics, and river ecology, among other expertise. This advisory team is knownmore » as the Research Design and Review Team (RDRT). The RDRT scientists drive the review, selection, and adaptive management of the research designs to evaluate the ecologic functions lost due to the operation of federal hydropower facilities. The unique nature of this project (scientific team, newest/best science, adaptive management, assessment of ecological functions, etc.) has been to work in a dynamic RDRT process. In addition to being multidisciplinary, this model KTOI project provides a stark contrast to the sometimes inflexible process (review, re-review, budgets, etc.) of the Columbia River Basin Fish and Wildlife Program. The project RDRT is assembled annually, with subgroups meeting as needed throughout the year to address project issues, analyses, review, and interpretation. Activities of RDRT coordinated and directed the selection of research and assessment methodologies appropriate for the Kootenai River Watershed and potential for regional application in the Columbia River Basin. The entire RDRT continues to meet annually to update and discuss project progress. RDRT Subcontractors work in smaller groups throughout the year to meet project objectives. Determining the extent to which ecological systems are experiencing anthropogenic disturbance and change in structure and function is critical for long term conservation of biotic diversity in the face of changing landscapes and land use. KTOI and the RDRT propose a concept based on incorporating hydrologic, aquatic, and terrestrial components into an operations-based assessment framework to assess ecological losses as shown in Figure E-1.« less

  17. Investing American Recovery and Reinvestment Act Funds to Advance Capability, Reliability, and Performance in NASA Wind Tunnels

    NASA Technical Reports Server (NTRS)

    Sydnor, Goerge H.

    2010-01-01

    The National Aeronautics and Space Administration's (NASA) Aeronautics Test Program (ATP) is implementing five significant ground-based test facility projects across the nation with funding provided by the American Recovery and Reinvestment Act (ARRA). The projects were selected as the best candidates within the constraints of the ARRA and the strategic plan of ATP. They are a combination of much-needed large scale maintenance, reliability, and system upgrades plus creating new test beds for upcoming research programs. The projects are: 1.) Re-activation of a large compressor to provide a second source for compressed air and vacuum to the Unitary Plan Wind Tunnel at the Ames Research Center (ARC) 2.) Addition of high-altitude ice crystal generation at the Glenn Research Center Propulsion Systems Laboratory Test Cell 3, 3.) New refrigeration system and tunnel heat exchanger for the Icing Research Tunnel at the Glenn Research Center, 4.) Technical viability improvements for the National Transonic Facility at the Langley Research Center, and 5.) Modifications to conduct Environmentally Responsible Aviation and Rotorcraft research at the 14 x 22 Subsonic Tunnel at Langley Research Center. The selection rationale, problem statement, and technical solution summary for each project is given here. The benefits and challenges of the ARRA funded projects are discussed. Indirectly, this opportunity provides the advantages of developing experience in NASA's workforce in large projects and maintaining corporate knowledge in that very unique capability. It is envisioned that improved facilities will attract a larger user base and capabilities that are needed for current and future research efforts will offer revenue growth and future operations stability. Several of the chosen projects will maximize wind tunnel reliability and maintainability by using newer, proven technologies in place of older and obsolete equipment and processes. The projects will meet NASA's goal of integrating more efficient, environmentally safer, and less energy consuming hardware and processes into existing tunnel systems. These include Environmental Protection Agency-approved refrigerants, energy efficient motors, and faster, flexible tunnel data systems.

  18. Hanford's Supplemental Treatment Project: Full-Scale Integrated Testing of In-Container-Vitrification and a 10,000-Liter Dryer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Witwer, K.S.; Dysland, E.J.; Garfield, J.S.

    2008-07-01

    The GeoMelt{sup R} In-Container Vitrification{sup TM} (ICV{sup TM}) process was selected by the U.S. Department of Energy (DOE) in 2004 for further evaluation as the supplemental treatment technology for Hanford's low-activity waste (LAW). Also referred to as 'bulk vitrification', this process combines glass forming minerals, LAW, and chemical amendments; dries the mixture; and then vitrifies the material in a refractory-lined steel container. AMEC Nuclear Ltd. (AMEC) is adapting its GeoMelt ICV{sup TM} technology for this application with technical and analytical support from Pacific Northwest National Laboratory (PNNL). The DVBS project is funded by the DOE Office of River Protection andmore » administered by CH2M HILL Hanford Group, Inc. The Demonstration Bulk Vitrification Project (DBVS) was initiated to engineer, construct, and operate a full-scale bulk vitrification pilot-plant to treat up to 750,000 liters of LAW from Waste Tank 241-S-109 at the DOE Hanford Site. Since the beginning of the DBVS project in 2004, testing has used laboratory, crucible-scale, and engineering-scale equipment to help establish process limitations of selected glass formulations and identify operational issues. Full-scale testing has provided critical design verification of the ICV{sup TM} process before operating the Hanford pilot-plant. In 2007, the project's fifth full-scale test, called FS-38D, (also known as the Integrated Dryer Melter Test, or IDMT,) was performed. This test had three primary objectives: 1) Demonstrate the simultaneous and integrated operation of the ICV{sup TM} melter with a 10,000- liter dryer, 2) Demonstrate the effectiveness of a new feed reformulation and change in process methodology towards reducing the production and migration of molten ionic salts (MIS), and, 3) Demonstrate that an acceptable glass product is produced under these conditions. Testing was performed from August 8 to 17, 2007. Process and analytical results demonstrated that the primary test objectives, along with a dozen supporting objectives, were successfully met. Glass performance exceeded all disposal performance criteria. A previous issue with MIS containment was successfully resolved in FS-38D, and the ICV{sup TM} melter was integrated with a full-scale, 10,000-liter dryer. This paper describes the rationale for performing the test, the purpose and outcome of scale-up tests preceding it, and the performance and outcome of FS-38D. (authors)« less

  19. Cortico-Cortical interactions between and within three cortical auditory areas specialized for time-domain signal processing

    PubMed Central

    Tang, Jie; Suga, Nobuo

    2009-01-01

    In auditory cortex of the mustached bat, the FF (F means frequency modulation), dorsal fringe (DF) and ventral fringe (VF) areas consist of “combination-sensitive” neurons tuned to the pair of an emitted biosonar pulse and its echo with a specific delay (best delay: BD). The DF and VF areas are hierarchically at a higher level than the FF area. Focal electric stimulation of the FF area evokes “centrifugal” BD shifts of DF neurons, i.e., shifts away from the BD of the stimulated FF neurons, whereas stimulation of the DF neurons evokes “centripetal” BD shifts of FF neurons, i.e., shifts toward the BD of the stimulated DF neurons. In our current studies, we found that the feed forward projection from FF neurons evokes centrifugal BD shifts of VF neurons, that the feedback projection from VF neurons evokes centripetal BD shifts of FF neurons, that the contralateral projection from DF neurons evokes centripetal BD shifts of DF neurons, and that the centripetal BD shifts evoked by the DF and VF neurons are 2.5 times larger than the centrifugal BD shifts evoked by the FF neurons. The centrifugal BD shifts shape the selective neural representation of a specific target-distance, whereas the centripetal BD shifts expand the representation of the selected specific target-distance to focus on the processing of the target information at a specific distance. The centrifugal and centripetal BD shifts evoked by the feed forward and feedback projections promote finer analysis of a target at shorter distances. PMID:19494145

  20. 28 CFR 34.3 - Selection criteria.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... achievement of project objectives; (4) The project management structure is adequate to the successful conduct....3 Selection criteria. (a) All individual project applications will, at a minimum, be subject to... to be addressed by the project is clearly stated; (2) The objectives of the proposed project are...

  1. 28 CFR 34.3 - Selection criteria.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... achievement of project objectives; (4) The project management structure is adequate to the successful conduct....3 Selection criteria. (a) All individual project applications will, at a minimum, be subject to... to be addressed by the project is clearly stated; (2) The objectives of the proposed project are...

  2. 28 CFR 34.3 - Selection criteria.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... achievement of project objectives; (4) The project management structure is adequate to the successful conduct....3 Selection criteria. (a) All individual project applications will, at a minimum, be subject to... to be addressed by the project is clearly stated; (2) The objectives of the proposed project are...

  3. 28 CFR 34.3 - Selection criteria.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... achievement of project objectives; (4) The project management structure is adequate to the successful conduct....3 Selection criteria. (a) All individual project applications will, at a minimum, be subject to... to be addressed by the project is clearly stated; (2) The objectives of the proposed project are...

  4. Adapting regional watershed management to climate change in Bavaria and Québec

    NASA Astrophysics Data System (ADS)

    Ludwig, Ralf; Muerth, Markus; Schmid, Josef; Jobst, Andreas; Caya, Daniel; Gauvin St-Denis, Blaise; Chaumont, Diane; Velazquez, Juan-Alberto; Turcotte, Richard; Ricard, Simon

    2013-04-01

    The international research project QBic3 (Quebec-Bavarian Collaboration on Climate Change) aims at investigating the potential impacts of climate change on the hydrology of regional scale catchments in Southern Quebec (Canada) and Bavaria (Germany). For this purpose, a hydro-meteorological modeling chain has been established, applying climatic forcing from both dynamical and statistical climate model data to an ensemble of hydrological models of varying complexity. The selection of input data, process descriptions and scenarios allows for the inter-comparison of the uncertainty ranges on selected runoff indicators; a methodology to display the relative importance of each source of uncertainty is developed and results for past runoff (1971-2000) and potential future changes (2041-2070) are obtained. Finally, the impact of hydrological changes on the operational management of dams, reservoirs and transfer systems is investigated and shown for the Bavarian case studies, namely the potential change in i) hydro-power production for the Upper Isar watershed and ii) low flow augmentation and water transfer rates at the Donau-Main transfer system in Central Franconia. Two overall findings will be presented and discussed in detail: a) the climate change response of selected hydrological indicators, especially those related to low flows, is strongly affected by the choice of the hydrological model. It can be shown that an assessment of the changes in the hydrological cycle is best represented by a complex physically based hydrological model, computationally less demanding models (usually simple, lumped and conceptual) can give a significant level of trust for selected indicators. b) the major differences in the projected climate forcing stemming from the ensemble of dynamic climate models (GCM/RCM) versus the statistical-stochastical WETTREG2010 approach. While the dynamic ensemble reveals a moderate modification of the hydrological processes in the investigated catchments, the WETTREG2010 driven runs show a severe detraction for all water operations, mainly related to a strong decline in projected precipitation in all seasons (except winter).

  5. Value of Investment as a Key Driver for Prioritization and Implementation of Healthcare Software.

    PubMed

    Bata, Seth A; Richardson, Terry

    2018-01-01

    Health systems across the nation are recovering from massive financial and resource investments in electronic health record applications. In the midst of these recovery efforts, implementations of new care models, including accountable care organizations and population health initiatives, are underway. The shift from fee-for-service to fee-for-outcomes and fee-for-value payment models calls for care providers to work in new ways. It also changes how physicians are compensated and reimbursed. These changes necessitate that healthcare systems further invest in information technology solutions. Selecting which information technology (IT) projects are of most value is vital, especially in light of recent expenditures. Return-on-investment analysis is a powerful tool used in various industries to select the most appropriate IT investments. It has proven vital in selecting, justifying, and implementing software projects. Other financial metrics, such as net present value, economic value added, and total economic impact, also quantify the success of expenditures on information systems. This paper extends the concept of quantifying project value to include clinical outcomes and nonfinancial value as investment returns, applying a systematic approach to healthcare software projects. We term this inclusive approach Value of Investment. It offers a necessary extension for application in clinical settings where a strictly financial view may fall short in providing a complete picture of important benefits. This paper outlines the Value of Investment process and its attributes, and uses illustrative examples to explore the efficacy of this methodology within a midsized health system.

  6. Value of Investment as a Key Driver for Prioritization and Implementation of Healthcare Software

    PubMed Central

    Bata, Seth A.; Richardson, Terry

    2018-01-01

    Health systems across the nation are recovering from massive financial and resource investments in electronic health record applications. In the midst of these recovery efforts, implementations of new care models, including accountable care organizations and population health initiatives, are underway. The shift from fee-for-service to fee-for-outcomes and fee-for-value payment models calls for care providers to work in new ways. It also changes how physicians are compensated and reimbursed. These changes necessitate that healthcare systems further invest in information technology solutions. Selecting which information technology (IT) projects are of most value is vital, especially in light of recent expenditures. Return-on-investment analysis is a powerful tool used in various industries to select the most appropriate IT investments. It has proven vital in selecting, justifying, and implementing software projects. Other financial metrics, such as net present value, economic value added, and total economic impact, also quantify the success of expenditures on information systems. This paper extends the concept of quantifying project value to include clinical outcomes and nonfinancial value as investment returns, applying a systematic approach to healthcare software projects. We term this inclusive approach Value of Investment. It offers a necessary extension for application in clinical settings where a strictly financial view may fall short in providing a complete picture of important benefits. This paper outlines the Value of Investment process and its attributes, and uses illustrative examples to explore the efficacy of this methodology within a midsized health system. PMID:29618963

  7. Disposing of High-Level Radioactive Waste in Germany - A Note from the Licensing Authority - 12530

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pick, Thomas Stefan; Bluth, Joachim; Lauenstein, Christof

    Following the national German consensus on the termination of utilisation of nuclear energy in the summer of 2011, the Federal and Laender Governments have declared their intention to work together on a national consensus on the disposal of radioactive waste as well. Projected in the early 1970's the Federal Government had started exploring the possibility to establish a repository for HLW at the Gorleben site in 1977. However, there is still no repository available in Germany today. The delay results mainly from the national conflict over the suitability of the designated Gorleben site, considerably disrupting German society along the crevicemore » that runs between supporters and opponents of nuclear energy. The Gorleben salt dome is situated in Lower Saxony, the German state that also hosts the infamous Asse mine repository for LLW and ILW and the Konrad repository project designated to receive LLW and ILW as well. With the fourth German project, the Morsleben L/ILW repository only 20 km away across the state border, the state of Lower Saxony carries the main load for the disposal of radioactive waste in Germany. After more than 25 years of exploration and a 10 year moratorium the Gorleben project has now reached a cross-road. Current plans for setting up a new site selection procedure in Germany call for the selection and exploration of up to four alternative sites, depending only on suitable geology. In the meantime the discussion is still open on whether the Gorleben project should be terminated in order to pacify the societal conflict or being kept in the selection process on account of its promising geology. The Lower Saxony Ministry for Environment and Climate Protection proposes to follow a twelve-step-program for finding the appropriate site, including the Gorleben site in the process. With its long history of exploration the site is the benchmark that alternative sites will have to compare with. Following the national consensus of 2011 on the termination of nuclear energy utilisation, it is now the time to reach a national consensus on the disposal of radioactive waste as well. This is a task that the country and society, federal and state governments, political parties and the citizens will have to jointly master within the current generation and within German territory. The basis for the consensus will be a reset to the beginning of this process. It has to start with a new site selection procedure that will take into account and compare up to four alternative sites. This procedure will have to follow the principle of highest possible security. It should be based on a stepwise approach, strictly following scientific criteria. Public confidence in the process and trust can only be achieved by a transparent procedure allowing for the participation of the public and the stakeholders. It is therefore mandatory to consult, both on a national and regional level, all involved parties (public authority, scientist and citizen). The national consensus must also include a decision on the future of the Gorleben exploratory site. The site selection procedure must therefore take this site into account as well. Furthermore, the final decision on safe disposal of German radioactive wastes must be made by sovereign rule by Federal Parliament and Federal Council. (authors)« less

  8. 23 CFR 450.330 - Project selection from the TIP.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project selection from the TIP. 450.330 Section 450.330 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.330 Project selection...

  9. 23 CFR 450.330 - Project selection from the TIP.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Project selection from the TIP. 450.330 Section 450.330 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.330 Project selection...

  10. 23 CFR 450.330 - Project selection from the TIP.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project selection from the TIP. 450.330 Section 450.330 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.330 Project selection...

  11. 23 CFR 450.330 - Project selection from the TIP.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Project selection from the TIP. 450.330 Section 450.330 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.330 Project selection...

  12. Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling

    NASA Astrophysics Data System (ADS)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is not allowed to take longer) and maximum total value of subcontracted work. The problem is modelled as a mixed binary linear program that minimizes project cost. It can be solved using universal solvers (e.g. LINGO, AIMMS, CPLEX, MATLAB and Optimization Toolbox, etc.). However, developing a dedicated decision-support tool would facilitate practical applications. To illustrate the idea of the model, the authors present a numerical example to find the optimal set of resources allocated to a project.

  13. International Asteroid Mission (IAM)

    NASA Astrophysics Data System (ADS)

    Yamaguchi, Ryuuji

    1991-07-01

    International Asteroid Mission (IAM) is a program aimed at developing resources of asteroids abundantly existing near the earth. This report describes the research results of design project of the International Space University (ISU) held in 1990 at Tront-York University. ISU research and asteroid survey results, and the manned asteroid mining mission are outlined. Classification of asteroids existing near the earth and asteroid resource processing and use analyses are conducted. Asteroid selection flow charts are introduced, and the 1982HR-Orpheus is selected as a candidate asteroid because it takes an approaching orbit toward the earth, requires small delta V, and possesses abundant carbonaceous chondrites. Characteristics of 1982HR-Orpheus are presented. Mission requirements, mission outlines, transportation systems, and mining and processing systems for manned asteroid mining missions are presented.

  14. Temporary Urine and Brine Stowage System (TUBSS) Materials Selection and Testing

    NASA Technical Reports Server (NTRS)

    Carrigan, Caitlin; Dries, Kevin; Pensinger, Stuart

    2011-01-01

    Storing wastewater in the event of a system anomaly is a necessity for closed loop water recovery systems. The temporary urine and brine stowage system (TUBSS) is an assembly used to store and transfer pre-treated urine (PTU) and brine for processing or disposal at a later date. This paper describes the selection and testing of several candidate materials from both a chemical and material strength standpoint. In addition, this paper will provide results of testing as well as lessons learned from the project, culminating in the successful launch of the hardware.

  15. Review of DOE Waste Package Program. Semiannual report, October 1984-March 1985. Volume 8

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, M.S.

    1985-12-01

    A large number of technical reports on waste package component performance were reviewed over the last year in support of the NRC`s review of the Department of Energy`s (DOE`s) Environmental Assessment reports. The intent was to assess in some detail the quantity and quality of the DOE data and their relevance to the high-level waste repository site selection process. A representative selection of the reviews is presented for the salt, basalt, and tuff repository projects. Areas for future research have been outlined. 141 refs.

  16. Trends and uncertainties in budburst projections of Norway spruce in Northern Europe.

    PubMed

    Olsson, Cecilia; Olin, Stefan; Lindström, Johan; Jönsson, Anna Maria

    2017-12-01

    Budburst is regulated by temperature conditions, and a warming climate is associated with earlier budburst. A range of phenology models has been developed to assess climate change effects, and they tend to produce different results. This is mainly caused by different model representations of tree physiology processes, selection of observational data for model parameterization, and selection of climate model data to generate future projections. In this study, we applied (i) Bayesian inference to estimate model parameter values to address uncertainties associated with selection of observational data, (ii) selection of climate model data representative of a larger dataset, and (iii) ensembles modeling over multiple initial conditions, model classes, model parameterizations, and boundary conditions to generate future projections and uncertainty estimates. The ensemble projection indicated that the budburst of Norway spruce in northern Europe will on average take place 10.2 ± 3.7 days earlier in 2051-2080 than in 1971-2000, given climate conditions corresponding to RCP 8.5. Three provenances were assessed separately (one early and two late), and the projections indicated that the relationship among provenance will remain also in a warmer climate. Structurally complex models were more likely to fail predicting budburst for some combinations of site and year than simple models. However, they contributed to the overall picture of current understanding of climate impacts on tree phenology by capturing additional aspects of temperature response, for example, chilling. Model parameterizations based on single sites were more likely to result in model failure than parameterizations based on multiple sites, highlighting that the model parameterization is sensitive to initial conditions and may not perform well under other climate conditions, whether the change is due to a shift in space or over time. By addressing a range of uncertainties, this study showed that ensemble modeling provides a more robust impact assessment than would a single phenology model run.

  17. Development studies for a novel wet oxidation process. Phase 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-07-01

    DETOX{sup SM} is a catalyzed wet oxidation process which destroys organic materials in an acidic water solution of iron at 373 to 473 K. The solution can be used repeatedly to destroy great amounts of organic materials. Since the process is conducted in a contained vessel, air emissions from the process can be well controlled. The solution is also capable of dissolving and concentrating many heavy and radioactive metals for eventual stabilization and disposal. The Phase 2 effort for this project is site selection and engineering design for a DETOX demonstration unit. Site selection was made using a set ofmore » site selection criteria and evaluation factors. A survey of mixed wastes at DOE sites was conducted using the Interim Mixed Waste Inventory Report. Sites with likely suitable waste types were identified. Potential demonstration sites were ranked based on waste types, interest, regulatory needs, scheduling, ability to provide support, and available facilities. Engineering design for the demonstration unit is in progress and is being performed by Jacobs Applied Technology. The engineering design proceeded through preliminary process flow diagrams (PFDs), calculation of mass and energy balances for representative waste types, process and instrumentation diagrams (P and IDs), preparation of component specifications, and a firm cost estimate for fabrication of the demonstration unit.« less

  18. Processing woody debris biomass for co-milling with pulverized coal

    Treesearch

    Dana Mitchell; Bob Rummer

    2007-01-01

    The USDA, Forest Service, Forest Products Lab funds several grants each year for the purpose of studying woody biomass utilization. One selected project proposed removing small diameter stems and unmerchantable woody material from National Forest lands and delivering it to a coal-fired power plant in Alabama for energy conversion. The Alabama Power Company...

  19. Determination of seismic performance factors for CLT shear wall systems

    Treesearch

    M. Omar Amini; John W. van de Lindt; Douglas Rammer; Shiling Pei; Philip Line; Marjan Popovski

    2016-01-01

    This paper presents selected results of connector testing and wall testing which were part of a Forest Products Lab-funded project undertaken at Colorado State University in an effort to determine seismic performance factors for cross laminated timber (CLT) shear walls in the United States. Archetype development, which is required as part of the process, is also...

  20. A Hierarchical Analysis of Bridge Decision Makers ... The Role of New Technology Adoption in the Timber Bridge Market: Special Project

    Treesearch

    Robert L. Smith; Robert J. Bush; Daniel L. Schmoldt

    1995-01-01

    Bridge design engineers and local highway officials make bridge replacement decisions across the United States. The Analytical Hierarchy Process was used to characterize the bridge material selection decision of these individuals. State Department of Transportation engineers, private consulting engineers, and local highway officials were personally interviewed in...

  1. A Behaviorally-Anchored Rating System to Monitor Treatment Integrity for Community Clinicians Using the Adolescent Community Reinforcement Approach

    ERIC Educational Resources Information Center

    Smith, Jane Ellen; Gianini, Loren M.; Garner, Bryan R.; Malek, Karen L.; Godley, Susan H.

    2014-01-01

    This study evaluated a process for training raters to reliably rate clinicians delivering the Adolescent Community Reinforcement Approach (A-CRA) in a national dissemination project. The unique A-CRA coding system uses specific behavioral anchors throughout its 73 procedure components. Five randomly selected raters each rated "passing"…

  2. A Framework to Support S&T Planning for Royal Australian Navy Capability Acquisition

    DTIC Science & Technology

    2012-03-01

    for guiding policy and assisting with strategic planning innovation processes. At the commencement of a Foresight Planning exercise the...for many Australian Defence Force (ADF) capability projects . Specifically, the methodology could prove beneficial in the development of science and...27 6.4 Selecting Appropriate Foresight Planning Methods ....................................... 28 7. SCIENCE AND

  3. From Widening Horizons to Widening Participation: Transmitting the Experience of Global Citizenship to the School Classroom

    ERIC Educational Resources Information Center

    Hampton, Cathy; Demeure-Ahearne, Ariane

    2016-01-01

    This paper gives account of a project involving Year Abroad students of French at Warwick University challenged to select "realia" from their host countries in order to stimulate enthusiasm for language learning in local schools. It considers the cognitive and affective processes informing the "culture gathering" that took…

  4. Teaching and Learning Critical Reading with Transnational Texts at a Mexican University: An Emergentist Case Study

    ERIC Educational Resources Information Center

    Perales Escudero, Moises Damian

    2011-01-01

    This dissertation project examines the implementation of a critical reading intervention in a Mexican university, and the emergence of target critical reading processes in Mexican college-level EFL readers. It uses a Complexity Theory-inspired, qualitative methodology. Orienting the selection and design of materials is a deep view of culture that…

  5. Case Study: Revising a Formal Case Study Presentation as an Independent Research Project

    ERIC Educational Resources Information Center

    Field, Patrick R.

    2013-01-01

    This article examines the process of researching and revising a case study presentation on an individual who experienced anesthetic awareness during an abdominal surgery and eventually committed suicide. Topics addressed include the author's selection of an undergraduate student with a science and teaching background to work on the case…

  6. Policy to Performance: State ABE Transition Systems Report. Transitioning Adults to Opportunity

    ERIC Educational Resources Information Center

    Alamprese, Judith A.

    2012-01-01

    The U.S. Department of Education's Policy to Performance project was funded in 2009 to build the capacity of state adult basic education (ABE) staff to develop and implement policies and practices that would support an ABE transition system. Policy to Performance states were selected though a competitive process. State adult education directors…

  7. Microfilming of the Texas Women: A Celebration of History Exhibit Archives in the Texas Woman's University Library.

    ERIC Educational Resources Information Center

    Nicewarner, Metta

    1988-01-01

    Description of the microfilming of a women's studies archive at the Texas Woman's University Library discusses: (1) project background; (2) criteria for equipment purchase; (3) equipment selected; (4) recommended resources; (5) indexing and layout decisions; (6) the filming process; and (7) the pros and cons of in-house microreproduction. (three…

  8. Bilingual Instructional Materials Dissemination Project. Report I: A Follow-Up Survey of SEDL Product Adopters.

    ERIC Educational Resources Information Center

    Butler, Jacqueline; McGinty, John

    The Southwest Evaluation and Research Division conducted a survey of 165 purchasers of bilingual instructional materials produced by SEDL to determine which information channels predominate in the curriculum adoption-decision process. The findings of this survey may be useful in the selection of the most efficient ways to communicate information…

  9. Physicochemical and morphological analysis of ten tomato varieties identifies quality traits more readily manipulated through breeding and traditional selection methods

    USDA-ARS?s Scientific Manuscript database

    Tomatoes (Solanum lycopersicum L.) are an important source of nutrients in contemporary diets due to readily available fresh fruit and processed products, their popularity, and the sheer volume consumed. This study is part of a larger project undertaken by the Agricultural Research Service (ARS) to...

  10. 23 CFR 450.220 - Project selection from the STIP.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project selection from the STIP. 450.220 Section 450.220 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.220 Project selection from...

  11. 23 CFR 450.220 - Project selection from the STIP.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project selection from the STIP. 450.220 Section 450.220 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.220 Project selection from...

  12. 23 CFR 450.220 - Project selection from the STIP.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Project selection from the STIP. 450.220 Section 450.220 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.220 Project selection from...

  13. 23 CFR 450.220 - Project selection from the STIP.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Project selection from the STIP. 450.220 Section 450.220 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.220 Project selection from...

  14. 23 CFR 450.220 - Project selection from the STIP.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Project selection from the STIP. 450.220 Section 450.220 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.220 Project selection from...

  15. Using technology to improve and support communication and workflow processes.

    PubMed

    Bahlman, Deborah Tuke; Johnson, Fay C

    2005-07-01

    In conjunction with a large expansion project, a team of perioperative staff members reviewed their workflow processes and designed their ideal patient tracking and communication system. Technologies selected and deployed included a passive infrared tracking system, an enhanced nurse call system, wireless telephones, and a web-based electronic grease board. The new system provides staff members with an easy way to obtain critical pieces of patient information, as well as track the progress of patients and locate equipment.

  16. Unified System Of Data On Materials And Processes

    NASA Technical Reports Server (NTRS)

    Key, Carlo F.

    1989-01-01

    Wide-ranging sets of data for aerospace industry described. Document describes Materials and Processes Technical Information System (MAPTIS), computerized set of integrated data bases for use by NASA and aerospace industry. Stores information in standard format for fast retrieval in searches and surveys of data. Helps engineers select materials and verify their properties. Promotes standardized nomenclature as well as standarized tests and presentation of data. Format of document of photographic projection slides used in lectures. Presents examples of reports from various data bases.

  17. Implementation and Qualifications Lessons Learned for Space Flight Photonic Components

    NASA Technical Reports Server (NTRS)

    Ott, Melanie N.

    2010-01-01

    This slide presentation reviews the process for implementation and qualification of space flight photonic components. It discusses the causes for most common anomalies for the space flight components, design compatibility, a specific failure analysis of optical fiber that occurred in a cable in 1999-2000, and another ExPCA connector anomaly involving pins that broke off. It reviews issues around material selection, quality processes and documentation, and current projects that the Photonics group is involved in. The importance of good documentation is stressed.

  18. An Ensemble Successive Project Algorithm for Liquor Detection Using Near Infrared Sensor.

    PubMed

    Qu, Fangfang; Ren, Dong; Wang, Jihua; Zhang, Zhong; Lu, Na; Meng, Lei

    2016-01-11

    Spectral analysis technique based on near infrared (NIR) sensor is a powerful tool for complex information processing and high precision recognition, and it has been widely applied to quality analysis and online inspection of agricultural products. This paper proposes a new method to address the instability of small sample sizes in the successive projections algorithm (SPA) as well as the lack of association between selected variables and the analyte. The proposed method is an evaluated bootstrap ensemble SPA method (EBSPA) based on a variable evaluation index (EI) for variable selection, and is applied to the quantitative prediction of alcohol concentrations in liquor using NIR sensor. In the experiment, the proposed EBSPA with three kinds of modeling methods are established to test their performance. In addition, the proposed EBSPA combined with partial least square is compared with other state-of-the-art variable selection methods. The results show that the proposed method can solve the defects of SPA and it has the best generalization performance and stability. Furthermore, the physical meaning of the selected variables from the near infrared sensor data is clear, which can effectively reduce the variables and improve their prediction accuracy.

  19. A Planetary Protection Strategy for the Mars Aerial Regional-Scale Environmental Survey (ARES) Mission Concept

    NASA Technical Reports Server (NTRS)

    Kuhl, Christopher A.

    2008-01-01

    The Aerial Regional-scale Environmental Survey (ARES) is a Mars exploration mission concept designed to send an airplane to fly through the lower atmosphere of Mars, with the goal of taking scientific measurements of the atmosphere, surface, and subsurface phenomenon. ARES was first proposed to the Mars Scout program in December 2002 for a 2007 launch opportunity and was selected to proceed with a Phase A study, step-2 proposal which was submitted in May 2003. ARES was not selected for the Scout mission, but efforts continued on risk reduction of the atmospheric flight system in preparation for the next Mars Scout opportunity in 2006. The ARES concept was again proposed in July 2006 to the Mars Scout program but was not selected to proceed into Phase A. This document describes the Planetary Protection strategy that was developed in ARES Pre Phase-A activities to help identify, early in the design process, certain hardware, assemblies, and/or subsystems that will require unique design considerations based on constraints imposed by Planetary Protection requirements. Had ARES been selected as an exploration project, information in this document would make up the ARES Project Planetary Protection Plan.

  20. Infrastructure for the design and fabrication of MEMS for RF/microwave and millimeter wave applications

    NASA Astrophysics Data System (ADS)

    Nerguizian, Vahe; Rafaf, Mustapha

    2004-08-01

    This article describes and provides valuable information for companies and universities with strategies to start fabricating MEMS for RF/Microwave and millimeter wave applications. The present work shows the infrastructure developed for RF/Microwave and millimeter wave MEMS platforms, which helps the identification, evaluation and selection of design tools and fabrication foundries taking into account packaging and testing. The selected and implemented simple infrastructure models, based on surface and bulk micromachining, yield inexpensive and innovative approaches for distributed choices of MEMS operating tools. With different educational or industrial institution needs, these models may be modified for specific resource changes using a careful analyzed iteration process. The inputs of the project are evaluation selection criteria and information sources such as financial, technical, availability, accessibility, simplicity, versatility and practical considerations. The outputs of the project are the selection of different MEMS design tools or software (solid modeling, electrostatic/electromagnetic and others, compatible with existing standard RF/Microwave design tools) and different MEMS manufacturing foundries. Typical RF/Microwave and millimeter wave MEMS solutions are introduced on the platform during the evaluation and development phases of the project for the validation of realistic results and operational decision making choices. The encountered challenges during the investigation and the development steps are identified and the dynamic behavior of the infrastructure is emphasized. The inputs (resources) and the outputs (demonstrated solutions) are presented in tables and flow chart mode diagrams.

  1. IV&V Project Assessment Process Validation

    NASA Technical Reports Server (NTRS)

    Driskell, Stephen

    2012-01-01

    The Space Launch System (SLS) will launch NASA's Multi-Purpose Crew Vehicle (MPCV). This launch vehicle will provide American launch capability for human exploration and travelling beyond Earth orbit. SLS is designed to be flexible for crew or cargo missions. The first test flight is scheduled for December 2017. The SLS SRR/SDR provided insight into the project development life cycle. NASA IV&V ran the standard Risk Based Assessment and Portfolio Based Risk Assessment to identify analysis tasking for the SLS program. This presentation examines the SLS System Requirements Review/System Definition Review (SRR/SDR), IV&V findings for IV&V process validation correlation to/from the selected IV&V tasking and capabilities. It also provides a reusable IEEE 1012 scorecard for programmatic completeness across the software development life cycle.

  2. Crystal Growth and Other Materials Physical Researches in Space Environment

    NASA Astrophysics Data System (ADS)

    Pan, Mingxiang

    Material science researches in space environment are based on reducing the effects of buoyancy driven transport, the effects of atomic oxygen, radiation, extremes of heat and cold and the ultrahigh vacuum, so as to unveil the underlying fundamental phenomena, lead maybe to new potential materials or new industrial processes and develop space techniques. Currently, research program on materials sciences in Chinese Manned Space Engineering (CMSE) is going on. More than ten projects related to crystal growth and materials processes are selected as candidates to be executed in Shenzhou spacecraft, Tiangong Space Laboratory and Chinese Space Station. In this talk, we will present some examples of the projects, which are being prepared and executed in the near future flight tasks. They are both basic and applied research, from discovery to technology.

  3. Hanford’s Supplemental Treatment Project: Full-Scale Integrated Testing of In-Container-Vitrification and a 10,000-Liter Dryer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Witwer, Keith S.; Dysland, Eric J.; Garfield, J. S.

    2008-02-22

    The GeoMelt® In-Container Vitrification™ (ICV™) process was selected by the U.S. Department of Energy (DOE) in 2004 for further evaluation as the supplemental treatment technology for Hanford’s low-activity waste (LAW). Also referred to as “bulk vitrification,” this process combines glass forming minerals, LAW, and chemical amendments; dries the mixture; and then vitrifies the material in a refractory-lined steel container. AMEC Nuclear Ltd. (AMEC) is adapting its GeoMelt ICV™ technology for this application with technical and analytical support from Pacific Northwest National Laboratory (PNNL). The DVBS project is funded by the DOE Office of River Protection and administered by CH2M HILLmore » Hanford Group, Inc. The Demonstration Bulk Vitrification Project (DBVS) was initiated to engineer, construct, and operate a full-scale bulk vitrification pilot-plant to treat up to 750,000 liters of LAW from Waste Tank 241-S-109 at the DOE Hanford Site. Since the beginning of the DBVS project in 2004, testing has used laboratory, crucible-scale, and engineering-scale equipment to help establish process limitations of selected glass formulations and identify operational issues. Full-scale testing has provided critical design verification of the ICV™ process before operating the Hanford pilot-plant. In 2007, the project’s fifth full-scale test, called FS-38D, (also known as the Integrated Dryer Melter Test, or IDMT,) was performed. This test had three primary objectives: 1) Demonstrate the simultaneous and integrated operation of the ICV™ melter with a 10,000-liter dryer, 2) Demonstrate the effectiveness of a new feed reformulation and change in process methodology towards reducing the production and migration of molten ionic salts (MIS), and, 3) Demonstrate that an acceptable glass product is produced under these conditions. Testing was performed from August 8 to 17, 2007. Process and analytical results demonstrated that the primary test objectives, along with a dozen supporting objectives, were successfully met. Glass performance exceeded all disposal performance criteria. A previous issue with MIS containment was successfully resolved in FS-38D, and the ICV™ melter was integrated with a full-scale, 10,000-liter dryer. This paper describes the rationale for performing the test, the purpose and outcome of scale-up tests preceding it, and the performance and outcome of FS-38D.« less

  4. TTI CM/AQ evaluation model user`s guide and workshop training materials. Interim research report, September 1993-August 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    The TTI CM/AQ Evaluation Model evaluates potential projects based on the following criteria: eligibility, travel impacts, emission impacts, and cost-effectiveness. To compare independent projects within a region during the decision process for CM/AQ funding, each project evaluated with this model is given an overall score based on the project`s effects for the criteria listed above. Training workshops were held by TTI in the first quarter of 1995 to teach metropolitan planning organization, state department of transportation, and regional air quality organization staff how to use this model. Basics of sketch-planning applications were also taught. The DRCOG and TTI CM/AQ Evaluationmore » Models represent significant steps toward the development of analytical methodologies for selecting projects for CM/AQ funding. Because the needs of nonattainment and attainment areas change over time, this model is particularly useful as key evaluation criteria can be modified to reflect the changing needs of a metropolitan area.« less

  5. Efficient structure from motion on large scenes using UAV with position and pose information

    NASA Astrophysics Data System (ADS)

    Teng, Xichao; Yu, Qifeng; Shang, Yang; Luo, Jing; Wang, Gang

    2018-04-01

    In this paper, we exploit prior information from global positioning systems and inertial measurement units to speed up the process of large scene reconstruction from images acquired by Unmanned Aerial Vehicles. We utilize weak pose information and intrinsic parameter to obtain the projection matrix for each view. As compared to unmanned aerial vehicles' flight altitude, topographic relief can usually be ignored, we assume that the scene is flat and use weak perspective camera to get projective transformations between two views. Furthermore, we propose an overlap criterion and select potentially matching view pairs between projective transformed views. A robust global structure from motion method is used for image based reconstruction. Our real world experiments show that the approach is accurate, scalable and computationally efficient. Moreover, projective transformations between views can also be used to eliminate false matching.

  6. STRATEGIES AND TECHNOLOGY FOR MANAGING HIGH-CARBON ASH

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robert Hurt; Eric Suuberg; John Veranth

    2004-02-13

    The overall objective of the present project was to identify and assess strategies and solutions for the management of industry problems related to carbon in ash. Specific issues addressed included: (1) the effect of parent fuel selection on ash properties and adsorptivity, including a first ever examination of the air entrainment behavior of ashes from alternative (non-coal) fuels; (2) the effect of various low-NOx firing modes on ash properties and adsorptivity based on pilot-plant studies; and (3) the kinetics and mechanism of ash ozonation. This laboratory data has provided scientific and engineering support and underpinning for parallel process development activities.more » The development work on the ash ozonation process has now transitioned into a scale-up and commercialization project involving a multi-industry team and scheduled to begin in 2004. This report describes and documents the laboratory and pilot-scale work in the above three areas done at Brown University and the University of Utah during this three-year project.« less

  7. Methods used and lessons learnt in conducting document reviews of medical and allied health curricula - a key step in curriculum evaluation.

    PubMed

    Rohwer, Anke; Schoonees, Anel; Young, Taryn

    2014-11-02

    This paper describes the process, our experience and the lessons learnt in doing document reviews of health science curricula. Since we could not find relevant literature to guide us on how to approach these reviews, we feel that sharing our experience would benefit researchers embarking on similar projects. We followed a rigorous, transparent, pre-specified approach that included the preparation of a protocol, a pre-piloted data extraction form and coding schedule. Data were extracted, analysed and synthesised. Quality checks were included at all stages of the process. The main lessons we learnt related to time and project management, continuous quality assurance, selecting the software that meets the needs of the project, involving experts as needed and disseminating the findings to relevant stakeholders. A complete curriculum evaluation comprises, apart from a document review, interviews with students and lecturers to assess the learnt and taught curricula respectively. Rigorous methods must be used to ensure an objective assessment.

  8. Recruiting post-doctoral fellows into global health research: selecting NIH Fogarty International Clinical Research Fellows.

    PubMed

    Heimburger, Douglas C; Warner, Tokesha L; Carothers, Catherine Lem; Blevins, Meridith; Thomas, Yolanda; Gardner, Pierce; Primack, Aron; Vermund, Sten H

    2014-08-01

    From 2008 to 2012, the National Institutes of Health (NIH) Fogarty International Clinical Research Fellows Program (FICRF) provided 1-year mentored research training at low- and middle-income country sites for American and international post-doctoral health professionals. We examined the FICRF applicant pool, proposed research topics, selection process, and characteristics of enrollees to assess trends in global health research interest and factors associated with applicant competitiveness. The majority (58%) of 67 US and 57 international Fellows were women, and 83% of Fellows had medical degrees. Most applicants were in clinical fellowships (41%) or residencies (24%). More applicants proposing infectious disease projects were supported (59%) than applicants proposing non-communicable disease (NCD) projects (41%), although projects that combined both topic areas were most successful (69%). The numbers of applicants proposing research on NCDs and the numbers of these applicants awarded fellowships rose dramatically over time. Funding provided to the FICRF varied significantly among NIH Institutes and Centers and was strongly associated with the research topics awarded. © The American Society of Tropical Medicine and Hygiene.

  9. The stimulus selectivity and connectivity of layer six principal cells reveals cortical microcircuits underlying visual processing.

    PubMed

    Vélez-Fort, Mateo; Rousseau, Charly V; Niedworok, Christian J; Wickersham, Ian R; Rancz, Ede A; Brown, Alexander P Y; Strom, Molly; Margrie, Troy W

    2014-09-17

    Sensory computations performed in the neocortex involve layer six (L6) cortico-cortical (CC) and cortico-thalamic (CT) signaling pathways. Developing an understanding of the physiological role of these circuits requires dissection of the functional specificity and connectivity of the underlying individual projection neurons. By combining whole-cell recording from identified L6 principal cells in the mouse primary visual cortex (V1) with modified rabies virus-based input mapping, we have determined the sensory response properties and upstream monosynaptic connectivity of cells mediating the CC or CT pathway. We show that CC-projecting cells encompass a broad spectrum of selectivity to stimulus orientation and are predominantly innervated by deep layer V1 neurons. In contrast, CT-projecting cells are ultrasparse firing, exquisitely tuned to orientation and direction information, and receive long-range input from higher cortical areas. This segregation in function and connectivity indicates that L6 microcircuits route specific contextual and stimulus-related information within and outside the cortical network. Copyright © 2014 The Authors. Published by Elsevier Inc. All rights reserved.

  10. 76 FR 4408 - Notice of Funding Availability for Applications for Credit Assistance Under the Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ...The DOT's TIFIA Joint Program Office (JPO) announces the availability of funding to support new applications for credit assistance. Under TIFIA, the DOT provides secured (direct) loans, lines of credit, and loan guarantees to public and private applicants for eligible surface transportation projects of regional or national significance. Projects must meet statutorily specified criteria to be selected for credit assistance. Because demand for the TIFIA program can exceed budgetary resources, the DOT is utilizing periodic fixed-date solicitations that will establish a competitive group of projects to be evaluated against the program objectives. This notice outlines the process that applicants must follow. This notice supersedes the notice published in the Federal Register on January 19, 2011, at 76 FR 3190.

  11. Using the NASA Giovanni DICCE Portal to Investigate Land-Ocean Linkages with Satellite and Model Data

    NASA Technical Reports Server (NTRS)

    Acker, James G.; Zalles, Daniel; Krumhansl, Ruth

    2012-01-01

    Data-enhanced Investigations for Climate Change Education (DICCE), a NASA climate change education project, employs the NASA Giovanni data system to enable teachers to create climate-related classroom projects using selected satellite and assimilated model data. The easy-to-use DICCE Giovanni portal (DICCE-G) provides data parameters relevant to oceanic, terrestrial, and atmospheric processes. Participants will explore land-ocean linkages using the available data in the DICCE-G portal, in particular focusing on temperature, ocean biology, and precipitation variability related to El Ni?o and La Ni?a events. The demonstration includes the enhanced information for educators developed for the DICCE-G portal. The prototype DICCE Learning Environment (DICCE-LE) for classroom project development will also be demonstrated.

  12. Understanding Recent Mass Balance Changes of the Greenland Ice Sheet

    NASA Technical Reports Server (NTRS)

    vanderVeen, Cornelius

    2003-01-01

    The ultimate goal of this project is to better understand the current transfer of mass between the Greenland Ice Sheet, the world's oceans and the atmosphere, and to identify processes controlling the rate of this transfer, to be able to predict with greater confidence future contributions to global sea level rise. During the first year of this project, we focused on establishing longer-term records of change of selected outlet glaciers, reevaluation of mass input to the ice sheet and analysis of climate records derived from ice cores, and modeling meltwater production and runoff from the margins of the ice sheet.

  13. Guidelines of the Design of Electropyrotechnic Firing Circuit for Unmanned Flight and Ground Test Projects

    NASA Technical Reports Server (NTRS)

    Gonzalez, Guillermo A.; Lucy, Melvin H.; Massie, Jeffrey J.

    2013-01-01

    The NASA Langley Research Center, Engineering Directorate, Electronic System Branch, is responsible for providing pyrotechnic support capabilities to Langley Research Center unmanned flight and ground test projects. These capabilities include device selection, procurement, testing, problem solving, firing system design, fabrication and testing; ground support equipment design, fabrication and testing; checkout procedures and procedure?s training to pyro technicians. This technical memorandum will serve as a guideline for the design, fabrication and testing of electropyrotechnic firing systems. The guidelines will discuss the entire process beginning with requirements definition and ending with development and execution.

  14. Bayesian conditional-independence modeling of the AIDS epidemic in England and Wales

    NASA Astrophysics Data System (ADS)

    Gilks, Walter R.; De Angelis, Daniela; Day, Nicholas E.

    We describe the use of conditional-independence modeling, Bayesian inference and Markov chain Monte Carlo, to model and project the HIV-AIDS epidemic in homosexual/bisexual males in England and Wales. Complexity in this analysis arises through selectively missing data, indirectly observed underlying processes, and measurement error. Our emphasis is on presentation and discussion of the concepts, not on the technicalities of this analysis, which can be found elsewhere [D. De Angelis, W.R. Gilks, N.E. Day, Bayesian projection of the the acquired immune deficiency syndrome epidemic (with discussion), Applied Statistics, in press].

  15. Towards Semantic Modelling of Business Processes for Networked Enterprises

    NASA Astrophysics Data System (ADS)

    Furdík, Karol; Mach, Marián; Sabol, Tomáš

    The paper presents an approach to the semantic modelling and annotation of business processes and information resources, as it was designed within the FP7 ICT EU project SPIKE to support creation and maintenance of short-term business alliances and networked enterprises. A methodology for the development of the resource ontology, as a shareable knowledge model for semantic description of business processes, is proposed. Systematically collected user requirements, conceptual models implied by the selected implementation platform as well as available ontology resources and standards are employed in the ontology creation. The process of semantic annotation is described and illustrated using an example taken from a real application case.

  16. METABOLIC ENGINEERING TO DEVELOP A PATHWAY FOR THE SELECTIVE CLEAVAGE OF CARBON-NITROGEN BONDS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John J. Kilbane III

    The objective of the project is to develop biochemical pathways for the selective cleavage of C-N bonds in molecules found in petroleum. The initial phase of the project will focus on the isolation or development of an enzyme capable of cleaving the C-N bond in aromatic amides, specifically 2-aminobiphenyl. The objective of the second phase of the research will be to construct a biochemical pathway for the selective removal of nitrogen from carbazole by combining the carA genes from Sphingomonas sp. GTIN11 with the gene(s) encoding an appropriate amidase. The objective of the final phase of the project will bemore » to develop derivative CN bond cleaving enzymes that have broader substrate ranges and to demonstrate the use of such strains to selectively remove nitrogen from petroleum. The project is on schedule and no major difficulties have been encountered. During the first year of the project (October, 2002-September, 2003) enrichment culture experiments have resulted in the isolation of promising cultures that may be capable of cleaving C-N bonds in aromatic amides, several amidase genes have been cloned and are currently undergoing directed evolution to obtain derivatives that can cleave C-N bonds in aromatic amides, and the carA genes from Sphingomonas sp. GTIN11, and Pseudomonas resinovorans CA10 were cloned in vectors capable of replicating in Escherichia coli. Future research will address expression of these genes in Rhodococcus erythropolis. Enrichment culture experiments and directed evolution experiments continue to be a main focus of research activity and further work is required to obtain an appropriate amidase that will selectively cleave C-N bonds in aromatic substrates. Once an appropriate amidase gene is obtained it must be combined with genes encoding an enzyme capable of converting carbazole to 2'aminobiphenyl-2,3-diol: specifically carA genes. The carA genes from two sources have been cloned and are ready for construction of C-N bond cleavage pathway. The construction of a new metabolic pathway to selectively remove nitrogen from carbazole and other molecules typically found in petroleum should lead to the development of a process to improve oil refinery efficiency by reducing the poisoning, by nitrogen, of catalysts used in the hydrotreating and catalytic cracking of petroleum.« less

  17. Using formative evaluation in an implementation project to increase vaccination rates in high-risk veterans: QUERI Series

    PubMed Central

    Wallace, Carolyn M; Legro, Marcia W

    2008-01-01

    Background Implementation of research into practice in health care systems is a challenging and often unsuccessful endeavor. The United States Department of Veterans Affairs (VA) Quality Enhancement Research Initiative (QUERI) research teams include formative evaluations (FE) in their action-oriented VA implementation projects to identify critical information about the processes of implementation that can guide adjustments to project activities, in order to better meet project goals. This article describes the development and use of FE in an action-oriented implementation research project. Methods This two-year action-oriented implementation research project was conducted at 23 VA Spinal Cord Injury (SCI) Centers, and targeted patients, staff and the system of care, such as administration and information technology. Data for FE were collected by electronic and paper surveys, semi-structured and open-ended interviews, notes during conference calls, and exchange of e-mail messages. Specific questions were developed for each intervention (designed to improve vaccination rates for influenza in veterans with spinal cord injury and disorder); informants were selected for their knowledge of interventions and their use in SCI Centers. Results Data from FE were compiled separately for each intervention to describe barriers to progress and guide adjustments to implementation activities. These data addressed the processes of implementing the interventions, problem-solving activities and the status of interventions at SCI Centers. Conclusion Formative evaluations provided the project team with a broad view of the processes of implementing multi-targeted interventions as well as the evolving status of the related best practice. Using FE was useful, although the challenges of conducting FE for non-field researchers should be addressed. Work is needed to develop methods for conducting FE across multiple sites, as well as acknowledging variations in local contexts that affect implementation of interventions. PMID:18430201

  18. Causative factors of cost overrun in highway projects of Sindh province of Pakistan

    NASA Astrophysics Data System (ADS)

    Sohu, S.; Halid, A.; Nagapan, S.; Fattah, A.; Latif, I.; Ullah, K.

    2017-11-01

    Cost overrun is an increase of cost of project from approved budget which was signed by parties at the time of tender. Cost overrun in construction of highway projects is a common problem worldwide and construction industry of Pakistan is also facing this crucial problem of cost overrun in highway projects of Pakistan. The main objective of this research is to identify the causative factors of cost overrun in highway projects of Sindh province of Pakistan. A well designed questionnaire was developed based on 64 common factors of cost overrun from literature review. Developed questionnaire was distributed among selected 30 experts from owner/client, designer/consultant and contractor who have experience more than 20 years’ experience in highway projects. The collected data was statistical analyzed. After analysis results showed that delay process in payment by client, inadequate planning, client interference, poor contract management, delay of decision making, change of scope of project and financial problems faced by client were most causative factors of cost overrun in highway projects. This research will provide alertness to stakeholders of highway projects of Sindh province to avoid cost overrun in projects.

  19. Hydrogen generator, via catalytic partial oxidation of methane for fuel cells

    NASA Astrophysics Data System (ADS)

    Recupero, Vincenzo; Pino, Lidia; Di Leonardo, Raffaele; Lagana', Massimo; Maggio, Gaetano

    It is well known that the most acknowledged process for generation of hydrogen for fuel cells is based upon the steam reforming of methane or natural gas. A valid alternative could be a process based on partial oxidation of methane, since the process is mildly exothermic and therefore not energy intensive. Consequently, great interest is expected from conversion of methane into syngas, if an autothermal, low energy intensive, compact and reliable process could be developed. This paper covers the activities, performed by the CNR Institute of Transformation and Storage of Energy (CNR-TAE), on theoretical and experimental studies for a compact hydrogen generator, via catalytic selective partial oxidation of methane, integrated with second generation fuel cells (EC-JOU2 contract). In particular, the project focuses the attention on methane partial oxidation via heterogeneous selective catalysts, in order to: demonstrate the basic catalytic selective partial oxidation of methane (CSPOM) technology in a subscale prototype, equivalent to a nominal output of 5 kWe; develop the CSPOM technology for its application in electric energy production by means of fuel cells; assess, by a balance of plant analysis, and a techno-economic evaluation, the potential benefits of the CSPOM for different categories of fuel cells.

  20. Some implications of the technology assessment function for the effective public decision-making process

    NASA Technical Reports Server (NTRS)

    Mayo, L. H.

    1971-01-01

    A preliminary provisional assessment of the prospects for the establishment of an adequate technology assessment function and the implications of the assessment function for the public decision process are presented. Effects of the technology assessment function on each phase of the public decision process and briefly explored. Significant implications during the next decade are projected with respect to the following phases: invention and development of alternative means (technological configurations); evaluation, selection and promotion of preferred courses of action; and modification of statutory scheme or social action program as an outcome of continuing monitoring and appraisal.

  1. Specifications for a Federal Information Processing Standard Data Dictionary System

    NASA Technical Reports Server (NTRS)

    Goldfine, A.

    1984-01-01

    The development of a software specification that Federal agencies may use in evaluating and selecting data dictionary systems (DDS) is discussed. To supply the flexibility needed by widely different applications and environments in the Federal Government, the Federal Information Processing Standard (FIPS) specifies a core DDS together with an optimal set of modules. The focus and status of the development project are described. Functional specifications for the FIPS DDS are examined for the dictionary, the dictionary schema, and the dictionary processing system. The DDS user interfaces and DDS software interfaces are discussed as well as dictionary administration.

  2. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  3. The Difficult Airway Society 'ADEPT' guidance on selecting airway devices: the basis of a strategy for equipment evaluation.

    PubMed

    Pandit, J J; Popat, M T; Cook, T M; Wilkes, A R; Groom, P; Cooke, H; Kapila, A; O'Sullivan, E

    2011-08-01

    Faced with the concern that an increasing number of airway management devices were being introduced into clinical practice with little or no prior evidence of their clinical efficacy or safety, the Difficult Airway Society formed a working party (Airway Device Evaluation Project Team) to establish a process by which the airway management community within the profession could itself lead a process of formal device/equipment evaluation. Although there are several national and international regulations governing which products can come on to the market and be legitimately sold, there has hitherto been no formal professional guidance relating to how products should be selected (i.e. purchased). The Airway Device Evaluation Project Team's first task was to formulate such advice, emphasising evidence-based principles. Team discussions led to a definition of the minimum level of evidence needed to make a pragmatic decision about the purchase or selection of an airway device. The Team concluded that this definition should form the basis of a professional standard, guiding those with responsibility for selecting airway devices. We describe how widespread adoption of this professional standard can act as a driver to create an infrastructure in which the required evidence can be obtained. Essential elements are that: (i) the Difficult Airway Society facilitates a coherent national network of research-active units; and (ii) individual anaesthetists in hospital trusts play a more active role in local purchasing decisions, applying the relevant evidence and communicating their purchasing decisions to the Difficult Airway Society. © 2011 The Authors. Anaesthesia © 2011 The Association of Anaesthetists of Great Britain and Ireland.

  4. Geoscientific Site Evaluation Approach for Canada's Deep Geological Repository for Used Nuclear Fuel

    NASA Astrophysics Data System (ADS)

    Sanchez-Rico Castejon, M.; Hirschorn, S.; Ben Belfadhel, M.

    2015-12-01

    The Nuclear Waste Management Organization (NWMO) is responsible for implementing Adaptive Phased Management, the approach selected by the Government of Canada for long-term management of used nuclear fuel generated by Canadian nuclear reactors. The ultimate objective of APM is the centralized containment and isolation of Canada's used nuclear fuel in a Deep Geological Repository in a suitable crystalline or sedimentary rock formation. In May 2010, the NWMO published and initiated a nine-step site selection process to find an informed and willing community to host a deep geological repository for Canada's used nuclear fuel. The site selection process is designed to address a broad range of technical and social, economic and cultural factors. The site evaluation process includes three main technical evaluation steps: Initial Screenings; Preliminary Assessments; and Detailed Site Characterizations, to assess the suitability of candidate areas in a stepwise manner over a period of many years. By the end of 2012, twenty two communities had expressed interest in learning more about the project. As of July 2015, nine communities remain in the site selection process. To date (July 2015), NWMO has completed Initial Screenings for the 22 communities that expressed interest, and has completed the first phase of Preliminary Assessments (desktop) for 20 of the communities. Phase 2 of the Preliminary Assessments has been initiated in a number of communities, with field activities such as high-resolution airborne geophysical surveys and geological mapping. This paper describes the approach, methods and criteria being used to assess the geoscientific suitability of communities currently involved in the site selection process.

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jung, Haeryong; Lee, Eunyong; Jeong, YiYeong

    Korea Radioactive-waste Management Corporation (KRMC) established in 2009 has started a new project to collect information on long-term stability of deep geological environments on the Korean Peninsula. The information has been built up in the integrated natural barrier database system available on web (www.deepgeodisposal.kr). The database system also includes socially and economically important information, such as land use, mining area, natural conservation area, population density, and industrial complex, because some of this information is used as exclusionary criteria during the site selection process for a deep geological repository for safe and secure containment and isolation of spent nuclear fuel andmore » other long-lived radioactive waste in Korea. Although the official site selection process has not been started yet in Korea, current integrated natural barrier database system and socio-economic database is believed that the database system will be effectively utilized to narrow down the number of sites where future investigation is most promising in the site selection process for a deep geological repository and to enhance public acceptance by providing readily-available relevant scientific information on deep geological environments in Korea. (authors)« less

  6. IT-supported integrated care pathways for diabetes: A compilation and review of good practices.

    PubMed

    Vrijhoef, Hubertus Jm; de Belvis, Antonio Giulio; de la Calle, Matias; de Sabata, Maria Stella; Hauck, Bastian; Montante, Sabrina; Moritz, Annette; Pelizzola, Dario; Saraheimo, Markku; Guldemond, Nick A

    2017-06-01

    Integrated Care Pathways (ICPs) are a method for the mutual decision-making and organization of care for a well-defined group of patients during a well-defined period. The aim of a care pathway is to enhance the quality of care by improving patient outcomes, promoting patient safety, increasing patient satisfaction, and optimizing the use of resources. To describe this concept, different names are used, e.g. care pathways and integrated care pathways. Modern information technologies (IT) can support ICPs by enabling patient empowerment, better management, and the monitoring of care provided by multidisciplinary teams. This study analyses ICPs across Europe, identifying commonalities and success factors to establish good practices for IT-supported ICPs in diabetes care. A mixed-method approach was applied, combining desk research on 24 projects from the European Innovation Partnership on Active and Healthy Ageing (EIP on AHA) with follow-up interviews of project participants, and a non-systematic literature review. We applied a Delphi technique to select process and outcome indicators, derived from different literature sources which were compiled and applied for the identification of successful good practices. Desk research identified sixteen projects featuring IT-supported ICPs, mostly derived from the EIP on AHA, as good practices based on our criteria. Follow-up interviews were then conducted with representatives from 9 of the 16 projects to gather information not publicly available and understand how these projects were meeting the identified criteria. In parallel, the non-systematic literature review of 434 PubMed search results revealed a total of eight relevant projects. On the basis of the selected EIP on AHA project data and non-systematic literature review, no commonalities with regard to defined process or outcome indicators could be identified through our approach. Conversely, the research produced a heterogeneous picture in all aspects of the projects' indicators. Data from desk research and follow-up interviews partly lacked information on outcome and performance, which limited the comparison between practices. Applying a comprehensive set of indicators in a multi-method approach to assess the projects included in this research study did not reveal any obvious commonalities which might serve as a blueprint for future IT-supported ICP projects. Instead, an unexpected high degree of heterogeneity was observed, that may reflect diverse local implementation requirements e.g. specificities of the local healthcare system, local regulations, or preexisting structures used for the project setup. Improving the definition of and reporting on project outcomes could help advance research on and implementation of effective integrated care solutions for chronic disease management across Europe.

  7. Application of Risk Assessment Tools in the Continuous Risk Management (CRM) Process

    NASA Technical Reports Server (NTRS)

    Ray, Paul S.

    2002-01-01

    Marshall Space Flight Center (MSFC) of the National Aeronautics and Space Administration (NASA) is currently implementing the Continuous Risk Management (CRM) Program developed by the Carnegie Mellon University and recommended by NASA as the Risk Management (RM) implementation approach. The four most frequently used risk assessment tools in the center are: (a) Failure Modes and Effects Analysis (FMEA), Hazard Analysis (HA), Fault Tree Analysis (FTA), and Probabilistic Risk Analysis (PRA). There are some guidelines for selecting the type of risk assessment tools during the project formulation phase of a project, but there is not enough guidance as to how to apply these tools in the Continuous Risk Management process (CRM). But the ways the safety and risk assessment tools are used make a significant difference in the effectiveness in the risk management function. Decisions regarding, what events are to be included in the analysis, to what level of details should the analysis be continued, make significant difference in the effectiveness of risk management program. Tools of risk analysis also depends on the phase of a project e.g. at the initial phase of a project, when not much data are available on hardware, standard FMEA cannot be applied; instead a functional FMEA may be appropriate. This study attempted to provide some directives to alleviate the difficulty in applying FTA, PRA, and FMEA in the CRM process. Hazard Analysis was not included in the scope of the study due to the short duration of the summer research project.

  8. Selection and Validation of Model Early Childhood Projects: Final Report.

    ERIC Educational Resources Information Center

    Stock, John R.; And Others

    Presented is the final report of a research program to select and describe outstanding Handicapped Children's Early Education Program (HCEEP) projects. Projects were analyzed in terms of 14 components of an HCEEP program (such as screening, programing, and inservice training). A detailed discussion of model selection and validation is appendixed.)…

  9. Decision making and senior management: the implementation of change projects covering clinical management in SUS hospitals.

    PubMed

    Pacheco, José Márcio da Cunha; Gomes, Romeu

    2016-08-01

    This paper analyses the decision making process for senior management in public hospitals that are a part of the National Health Service in Brazil (hereafter SUS) in relation to projects aimed at changing clinical management. The methodological design of this study is qualitative in nature taking a hermeneutics-dialectics perspective in terms of results. Hospital directors noted that clinical management projects changed the state of hospitals through: improving their organizations, mobilizing their staff in order to increase a sense of order and systemizing actions and available resources. Technical rationality was the principal basis used in the decision making process for managers. Due to the reality of many hospitals having fragmented organizations, this fact impeded the use of aspects related to rationality, such as economic and financial factors in the decision making process. The incremental model and general politics also play a role in this area. We concluded that the decision making process embraces a large array of factors including rational aspects such as the use of management techniques and the ability to analyze, interpret and summarize. It also incorporates subjective elements such as how to select values and dealing with people's working experiences. We recognized that management problems are wide in scope, ambiguous, complex and do not come with a lot of structure in practice.

  10. Working definitions, subjective and objective assessments and experimental paradigms in a study exploring social withdrawal in schizophrenia and Alzheimer's disease.

    PubMed

    van der Wee, Nic J A; Bilderbeck, Amy C; Cabello, Maria; Ayuso-Mateos, Jose L; Saris, Ilya M J; Giltay, Erik J; Penninx, Brenda Wjh; Arango, Celso; Post, Anke; Porcelli, Stefano

    2018-06-24

    Social withdrawal is one of the first and common signs of early social dysfunction in a number of important neuropsychiatric disorders, likely because of the enormous amount and complexity of brain processes required to initiate and maintain social relationships (Adolphs, 2009). The Psychiatric Ratings using Intermediate Stratified Markers (PRISM) project focusses on the shared and unique neurobiological basis of social withdrawal in schizophrenia, Alzheimer and depression. In this paper, we discuss the working definition of social withdrawal for this study and the selection of objective and subjective rating scales to assess social withdrawal chosen or adapted for this project. We also discuss the MRI and EEG paradigms selected to study the systems and neural circuitry thought to underlie social functioning and more particularly to be involved in social withdrawal in humans, such as the social perception and the social affiliation networks. A number of behavioral paradigms were selected to assess complementary aspects of social cognition. Also, a digital phenotyping method (a smartphone application) was chosen to obtain real-life data. Copyright © 2018. Published by Elsevier Ltd.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weber, Peter M.

    Executive Summary In conjunction with the Brown Energy Initiative, research Projects selected for the fuel cell research grant were selected on the following criteria: They should be fundamental research that has the potential to significantly impact the nation’s energy infrastructure. They should be scientifically exciting and sound. They should synthesize new materials, lead to greater insights, explore new phenomena, or design new devices or processes that are of relevance to solving the energy problems. They involve top-caliper senior scientists with a record of accomplishment, or junior faculty with outstanding promise of achievement. They should promise to yield at least preliminarymore » results within the given funding period, which would warrant further research development. They should fit into the overall mission of the Brown Energy Initiative, and the investigators should contribute as partners to an intellectually stimulating environment focused on energy science. Based on these criteria, fourteen faculty across three disciplines (Chemistry, Physics and Engineering) and the Charles Stark Draper Laboratory were selected to participate in this effort.1 In total, there were 30 people supported, at some level, on these projects. This report highlights the findings and research outcomes of the participating researchers.« less

  12. Analysis of renewable energy projects' implementation in Russia

    NASA Astrophysics Data System (ADS)

    Ratner, S. V.; Nizhegorodtsev, R. M.

    2017-06-01

    With the enactment in 2013 of a renewable energy scheme by contracting qualified power generation facilities working on renewable energy sources (RES), the process of construction and connection of such facilities to the Federal Grid Company has intensified in Russia. In 2013-2015, 93 projects of solar, wind, and small hydropower energy were selected on the basis of competitive bidding in the country with the purpose of subsequent support. Despite some technical and organizational problems and a time delay of some RES projects, in 2014-2015 five solar generating facilities with total capacity of 50 MW were commissioned, including 30 MW in Orenburg oblast. However, the proportion of successful projects is low and amounts to approximately 30% of the total number of announced projects. The purpose of this paper is to analyze the experience of implementation of renewable energy projects that passed through a competitive selection and gained the right to get a partial compensation for the construction and commissioning costs of RES generating facilities in the electric power wholesale market zone. The informational background for the study is corporate reports of project promoters, analytical and information materials of the Association NP Market Council, and legal documents for the development of renewable energy. The methodological base of the study is a theory of learning curves that assumes that cost savings in the production of high-tech products depends on the production growth rate (economy of scale) and gaining manufacturing experience (learning by doing). The study has identified factors that have a positive and a negative impact on the implementation of RES projects. Improvement of promotion measures in the renewable energy development in Russia corresponding to the current socio-economic situation is proposed.

  13. Antibody Characterization Process | Office of Cancer Clinical Proteomics Research

    Cancer.gov

    The goal of the NCI's Antibody Characterization Program (ACP) is to have three monoclonal antibodies produced for each successfully expressed/purified recombinant antigen and one antibody per peptide (1 to 3 peptides per protein). To date, over 4000 clones have been screened before selecting the current 393 antibodies. They are winnowed down based on the projected end use of the antibody.

  14. Quality - Inexpensive if a way of life.

    NASA Technical Reports Server (NTRS)

    Grau, D.

    1972-01-01

    NASA major projects require phased planning. The participation of persons charged with maintaining the proper quality during the last two of four phases has become accepted practice. Current objectives are concerned with the application of quality assurance techniques during the second phase. It is pointed out that quality must be emphasized during the entire engineering process, starting with the selection of the components.

  15. Applying Real-Time UML: Real-World Experiences

    NASA Astrophysics Data System (ADS)

    Cooling, Niall; Pachschwoell, Stefan

    2004-06-01

    This paper presents Austrian Aerospace's experiences of applying UML for the design of an embedded real-time avionics system based on Feabhas' "Pragma Process". It describes the complete lifecycle from adoption of UML, through training, CASE-tool selection, system analysis, and software design and development of the project itself. It concludes by reflecting on the experiences obtained and some lessons learnt.

  16. Electric Motors Everywhere: Most Forms of Energy Go through Some Conversion Process to Do Useful Work for Us

    ERIC Educational Resources Information Center

    Deal, Walter F., III

    2004-01-01

    This article discusses electric motors and the many ways in which they are used. Selecting the most appropriate miniature DC electric motor wisely will contribute toward success and satisfaction in designing and building motorized projects and activities. Typical parts suppliers stock a variety of miniature DC motors and provide sufficient…

  17. Assessing the Usefulness of the Decision Framework for Identifying and Selecting Knowledge Management Projects

    DTIC Science & Technology

    2005-03-01

    team-wide accountability and rewards Functional focus Group accountability and rewards Employee-owner interest conflicts Process focus Lack of...Collaborative and cross-functional work Incompatible IT Need to share Compartmentalization of functional groups Localized decision making Centralized...Steps are: • Step 1: Analyze Corporate Strategic Objectives Using SWOT (Strengths, Weaknesses, Opportunities, Threats) Methodology • Step 2

  18. ALCF Data Science Program: Productive Data-centric Supercomputing

    NASA Astrophysics Data System (ADS)

    Romero, Nichols; Vishwanath, Venkatram

    The ALCF Data Science Program (ADSP) is targeted at big data science problems that require leadership computing resources. The goal of the program is to explore and improve a variety of computational methods that will enable data-driven discoveries across all scientific disciplines. The projects will focus on data science techniques covering a wide area of discovery including but not limited to uncertainty quantification, statistics, machine learning, deep learning, databases, pattern recognition, image processing, graph analytics, data mining, real-time data analysis, and complex and interactive workflows. Project teams will be among the first to access Theta, ALCFs forthcoming 8.5 petaflops Intel/Cray system. The program will transition to the 200 petaflop/s Aurora supercomputing system when it becomes available. In 2016, four projects have been selected to kick off the ADSP. The selected projects span experimental and computational sciences and range from modeling the brain to discovering new materials for solar-powered windows to simulating collision events at the Large Hadron Collider (LHC). The program will have a regular call for proposals with the next call expected in Spring 2017.http://www.alcf.anl.gov/alcf-data-science-program This research used resources of the ALCF, which is a DOE Office of Science User Facility supported under Contract DE-AC02-06CH11357.

  19. "Bounded" empowerment: analyzing tensions in the practice of youth-led participatory research in urban public schools.

    PubMed

    Ozer, Emily J; Newlan, Sami; Douglas, Laura; Hubbard, Elizabeth

    2013-09-01

    This multi-method study examines tensions in the practice of youth-led participatory research (YPAR) in urban high schools among 15 semester-cohorts. Student participants in the present study were 77 ethnically diverse youth from four high schools in a major metropolitan school district. Data were gathered using systematic classroom observations, interviews with teachers and students involved in the projects, and participant observation. The two most commonly-constrained phases of the YPAR project were issue selection and action steps. A central tension in the issue selection phase for projects enacted across multiple semester cohorts was the tension between original inquiry and "traction:" Sticking with the same topic enabled sustained building of strategic alliances and expertise for making change, but limited the incoming cohort's power to define the problem to be addressed. In further analyses, we identified processes that promoted student power despite continuity-related constraints-teachers' framing and buy-in strategies, "micro-power" compensation, and alignment of students' interests with the prior cohort-as well as constraints in other phases of the projects. This study's findings regarding the promotion of youth power in the face of constraints advance the integration of theory and practice in youth-led research and have implications for participatory research more broadly.

  20. Developing a national framework of quality indicators for public hospitals.

    PubMed

    Simou, Effie; Pliatsika, Paraskevi; Koutsogeorgou, Eleni; Roumeliotou, Anastasia

    2014-01-01

    The current study describes the development of a preliminary set of quality indicators for public Greek National Health System (GNHS) hospitals, which were used in the "Health Monitoring Indicators System: Health Map" (Ygeionomikos Chartis) project, with the purpose that these quality indicators would assess the quality of all the aspects relevant to public hospital healthcare workforce and services provided. A literature review was conducted in the MEDLINE database to identify articles referring to international and national hospital quality assessment projects, together with an online search for relevant projects. Studies were included if they were published in English, from 1980 to 2010. A consensus panel took place afterwards with 40 experts in the field and tele-voting procedure. Twenty relevant projects and their 1698 indicators were selected through the literature search, and after the consensus panel process, a list of 67 indicators were selected to be implemented for the assessment of the public hospitals categorized under six distinct dimensions: Quality, Responsiveness, Efficiency, Utilization, Timeliness, and Resources and Capacity. Data gathered and analyzed in this manner provided a novel evaluation and monitoring system for Greece, which can assist decision-makers, healthcare professionals, and patients in Greece to retrieve relevant information, with the long-term goal to improve quality in care in the GNHS hospital sector. Copyright © 2014 John Wiley & Sons, Ltd.

Top