Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration. Division of Fish and Wildlife.
1988-11-01
The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or moremore » BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.« less
SIGIR Quarterly Report to the United States Congress
2007-04-30
4975 APOLLO PORTABLE PROJECTOR SCREEN 60” INSTANT CINEMA PROJECTION SCREEN ITEM# 20022351 SYTLES#: 60300 $12,750.00 $12,750.00 $0.00 CEFMS ISFF2 4/2...Generators: 200 MW ( Japanese Generator Sets) Start Date: 9/26/2003 13C 400kV Line from Baghdad South to Diwaniyah (27 towers; 810 km of wire) Start Date
Fiscal Year 1986 Technical Objective Document (TOD).
1986-03-01
abilties superior to other IR and manual turrets. - START DATE: FY 88 END DATE: FY 90" PROJECT TITLE: COMPOSITE METAL FIRES EE 62:06 JON: 2673XXXX...TECHNOLOGY: FIRE ELEMENT: INTERACTION DESCRIPTION (TECHNICAL OBJECTIVE) Evaluate a new series of agents "BORALONS" capable of extinguishing metal fires and...PROJECT TITLE: COMPOSITE METAL FIRES PE: 63723 JON: 2104XXXX
Novel Therapy for Bone Regeneration in Large Segmental Defects
2017-12-01
HC, Giannoudis PV. Fat embolism and IM nailing. Injury. 2006;37(Suppl 4):S1–2. 38. Wenda K, Ritter G, Degreif J, Rudigier J. Pathogenesis of pul...morphogenetic protein (BMP), thrombopoietin (TPO), therapy, fracture healing, bone regeneration, minipig, pig 16. SECURITY CLASSIFICATION OF: 17... fracture healing, bone regeneration, minipig, pig 3. OVERALL PROJECT SUMMARY: Project start date 30/09/2013 Project end date 29/09/2017 (with 1 year NCE
Concentrating Solar Power Projects - Huanghe Qinghai Delingha 135 MW DSG
development Start Year: 2017 Do you have more information, corrections, or comments? Background Technology PDF Break Ground: 2015 Start Production: 2017 PPA/Tariff Date: September 1, 2016 PPA/Tariff Type: Feed
Concentrating Solar Power Projects - Extresol-1 | Concentrating Solar Power
: 50.0 MW Status: Operational Start Year: 2010 Do you have more information, corrections, or comments Start Production: January 1, 2010 Construction Job-Years: 600 Annual O&M Jobs: 40 PPA/Tariff Date
2011-05-16
Project Sponsor: CAPT Chris Ray Black/Green Belt: CDR Mike Ryan Business Impact ($) KAIZEN / Rapid Improvement Event The expected impacts of this...Availability Contracts Project Methodology: DMAIC DFSS Kaizen Project Plan—list planned dates for each DMAIC phase Kaizen start and end dates...Initial Plan of Action for Kaizen Week 1) List and quantify elements that make the Big X metrics; 2) Capture the current competition categories into which
Modeling Spatial Maps Inspired by the Hippocampal System
2015-08-24
assigned to the award James Lawton Reporting Period Start Date 04/01/2012 Reporting Period End Date 03/31/2015 Abstract How the hippocampus encodes both...Manager, if any: During this project the Program Manager was changed from Dr. Jay Ayung to Dr. James Lawton . Extensions granted or milestones slipped
13 CFR 308.2 - Performance awards.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Performance awards. 308.2 Section 308.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE... Recipient's projection of private sector capital invested; (3) Meet or exceed target dates for Project start...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Glenn Doran
1997-04-28
This report summarizes the status of this project for the quarter January 1, 1997 to March 31, 1997. Phase II has been started and Task 7, Develop Pilot Scale Test Work Plan has been completed. The operational portion of this phase, Task 8 has been initiated with several pieces of pilot equipment already on-site. The start up of the full process train will not occur until the next quarter. The project is slightly behind schedule. A no cost extension was requested and was granted. The anticipated completion date is December 31, 1997. The project is on budget.
Planting forests in NYC: Is the goal restoration, reforestation, or afforestation?
R.A. Hallett
2013-01-01
Chicago, Los Angeles, Philadelphia, Detroit, New York City (NYC) and many other cities in the United States and around the world are engaging in urban greening projects. Urban greening almost always involves planting trees... lots of trees. New York City, for example, has planted over 750,000 trees to date as part of a project that started in 2007 â a project with the...
The Reliability and Sources of Error of Using Rubrics-Based Assessment for Student Projects
ERIC Educational Resources Information Center
Menéndez-Varela, José-Luis; Gregori-Giralt, Eva
2018-01-01
Rubrics are widely used in higher education to assess performance in project-based learning environments. To date, the sources of error that may affect their reliability have not been studied in depth. Using generalisability theory as its starting-point, this article analyses the influence of the assessors and the criteria of the rubrics on the…
Novel Therapy for Bone Regeneration in Large Segmental Defects
2017-12-01
healing. Clin Orthop Relat Res. 1998;355(Suppl):S230–8. 37. Pape HC, Giannoudis PV. Fat embolism and IM nailing. Injury. 2006;37(Suppl 4):S1–2. 38. Wenda...mechanisms to elicit bone healing. 15. SUBJECT TERMS Bone healing, bone morphogenetic protein (BMP), thrombopoietin (TPO), therapy, fracture healing...thrombopoietin (TPO), therapy, fracture healing, bone regeneration, minipig, pig 3. OVERALL PROJECT SUMMARY: Project start date 30/09/2013 Project end
Current status of the joint Mayo Clinic-IBM PACS project
NASA Astrophysics Data System (ADS)
Hangiandreou, Nicholas J.; Williamson, Byrn, Jr.; Gehring, Dale G.; Persons, Kenneth R.; Reardon, Frank J.; Salutz, James R.; Felmlee, Joel P.; Loewen, M. D.; Forbes, Glenn S.
1994-05-01
A multi-phase collaboration between Mayo Clinic and IBM-Rochester was undertaken, with the goal of developing a picture archiving and communication system for routine clinical use in the Radiology Department. The initial phase of this project (phase 0) was started in 1988. The current system has been fully integrated into the clinical practice and, to date, over 6.5 million images from 16 imaging modalities have been archived. Phase 3 of this project has recently concluded.
76 FR 44659 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-26
... information collection requirements related to new technologies in retirement plans. DATES: Written comments....gov . SUPPLEMENTARY INFORMATION: Title: New Technologies in Retirement Plans. OMB Number: 1545-1632... information technology; and (e) estimates of capital or start-up costs and costs of operation, maintenance...
Whole Frog Project and Virtual Frog Dissection Statistics wwwstats output for January 1 through duplicate or extraneous accesses. For example, in these statistics, while a POST requesting an image is as well. Note that this under-represents the bytes requested. Starting date for following statistics
Chmielewski, Frank-M; Blümel, Klaus; Scherbaum-Heberer, Carina; Koppmann-Rumpf, Bettina; Schmidt, Karl-Heinz
2013-03-01
The aim of this study was to select a phenological model that is able to calculate the beginning of egg laying of Great Tit (Parus major) for both current and future climate conditions. Four models (M1-M4) were optimised on long-term phenological observations from the Ecological Research Centre Schlüchtern (Hessen/Germany). Model M1 was a common thermal time model that accumulates growing degree days (GDD) on an optimised starting date t (1). Since egg laying of Great Tit is influenced not only by air temperature but also by photoperiod, model M1 was extended by a daylength term to give M2. The other two models, M3 and M4, correspond to M1 and M2, but t (1) was intentionally set to 1 January, in order to consider already rising temperatures at the beginning of the year. A comparison of the four models led to following results: model M1 had a relatively high root mean square error at verification (RMSE(ver)) of more than 4 days and can be used only to calculate the start of egg laying for current climate conditions because of the relatively late starting date for GDD calculation. The model failed completely if the starting date was set to 1 January (M3). Consideration of a daylength term in models M2 and M4 improved the performance of both models strongly (RMSE(ver) of only 3 days or less), increased the credibility of parameter estimation, and was a precondition to calculate reliable projections in the timing of egg laying in birds for the future. These results confirm that the start of egg laying of Great Tit is influenced not only by air temperature, but also by photoperiod. Although models M2 and M4 both provide comparably good results for current climate conditions, we recommend model M4-with a starting date of temperature accumulation on 1 January-for calculating possible future shifts in the commencement of egg laying. Our regional projections in the start of egg laying, based on five regional climate models (RCMs: REMO-UBA, ECHAM5-CLM, HadCM3-CLM, WETTREG-0, WETTREG-1, GHG emission scenario A1B), indicate that in the near future (2011-2040) no significant change will take place. However, in the mid- (2041-2070) and long-term (2071-2100) range the beginning of egg laying could be advanced significantly by up to 11 days on average of all five RCMs. This result corresponds to the already observed shift in the timing of egg laying by about 1 week, due mainly to an abrupt increase in air temperature at the end of the 1980s by 1.2 K between April and May. The use of five regional climate scenarios additionally allowed to estimate uncertainties among the RCMs.
Spent nuclear fuel canister storage building conceptual design report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Swenson, C.E.
This Conceptual Design Report provides the technical basis for the Spent Nuclear Fuels Project, Canister Storage Building, and as amended by letter (correspondence number 9555700, M.E. Witherspoon to E.B. Sellers, ``Technical Baseline and Updated Cost Estimate for the Canister Storage Building``, dated October 24, 1995), includes the project cost baseline and Criteria to be used as the basis for starting detailed design in fiscal year 1995.
Annual Report of the Chief of Engineers, U.S. Army, on Civil Works Activities 1966. Volume 1
1966-01-01
Pines ), Cypress Creek, Tex. 4,336,000 Clark Hill Reservoir, Savannah River, S.C. & Ga. -------- 4,264,000 Lake Cumberland (Wolf Creek Dam), Cumberland... Plymouth Harbor, Mass ......... Rollison Channel, N.C - Texas City Channel, Tex. (40- foot)----------- Wallisville Reservoir_ Schedul Date started fiscal...Project Pat Mayse, Tex - Perry, Kans__ Perry County, Mo- Pine Creek, Okla _ Pine Flat, Calif_ Fiscal year started 1965 1964 1937 1963 1947 Proctor, Tex_
Agro-climate Projections for a Warming Alaska
NASA Astrophysics Data System (ADS)
Lader, R.; Walsh, J. E.; Bhatt, U. S.; Bieniek, P.
2017-12-01
In the context of greenhouse warming, agro-meteorological indices suggest widespread disruption to current food supply chains during the coming decades. Much of the western United States is projected to have more dry days, and the southern states are likely to experience greater plant heat stress. Considering these difficulties, it could become necessary for more northerly locations, including Alaska, to increase agricultural production to support local communities and offset supply shortages. This study employs multiple dynamically downscaled regional climate model simulations from the CMIP5 to investigate projected changes to agro-climate conditions across Alaska. The metric used here, the start-of-field operations index (SFO), identifies the date during which the sum of daily average temperature, starting from January 1st and excluding negative values, exceeds 200 ˚C. Using the current trajectory of greenhouse radiative forcing, RCP 8.5, this study indicates a doubling to 71,960 km2 of Alaska land area that meets the required thermal accumulation for crop production when comparing a historical period (1981-2010) to the future (2071-2100). The SFO shows a correlation coefficient of 0.91 with the independently produced green-up index for Fairbanks from 1981-2010. Among the land areas that currently reach the necessary thermal accumulation, there is a projected increase in growing season length (63-82 days), earlier date of last spring frost (28-48 days), and later date of first autumn frost (24-47 days) across the five USDA Census of Agriculture areas for Alaska. Both an average statewide decrease of annual frost days (71 fewer), and an increase in days with extreme warmth (28 more) are also projected.
NASA Technical Reports Server (NTRS)
Rossow, William B. (Principal Investigator)
Since 1983 an international group of institutions has collected and analyzed satellite radiance measurements from up to five geostationary and two polar orbiting satellites to infer the global distribution of cloud properties and their diurnal, seasonal and interannual variations. The primary focus of the first phase of the project (1983-1995) was the elucidation of the role of clouds in the radiation budget (top of the atmosphere and surface). In the second phase of the project (1995 onwards) the analysis also concerns improving understanding of clouds in the global hydrological cycle. [Location=GLOBAL] [Temporal_Coverage: Start_Date=1983-07-01; Stop_Date=] [Spatial_Coverage: Southernmost_Latitude=-90; Northernmost_Latitude=90; Westernmost_Longitude=-180; Easternmost_Longitude=180] [Data_Resolution: Latitude_Resolution=112 Km; Longitude_Resolution=112 Km; Temporal_Resolution=5-day].
Healthy start program participation: the consumers' perspective.
Ley, Christine E; Copeland, Valire Carr; Flint, Cheryl Squire
2011-01-01
In 1991, the federal Maternal and Child Health Bureau developed the Healthy Start Initiative as a comprehensive community-based program to eliminate the high rates of poor pregnancy outcomes among women of color. To date, few studies of the programmatic outcomes of this Initiative have examined the views of Healthy Start consumers. To understand the benefits of Healthy Start from their consumers' perspective, the Pittsburgh Allegheny County Healthy Start project conducted a survey of 202 of their Healthy Start participants in 2003. The participants completing the survey reported benefits of participating in the program including stress reduction, receiving resources and referrals, and consistent social support of program staff. According to the project's annual statistics, Healthy Start has improved pregnancy outcomes among African American women participants in the Pittsburgh community. However, and according to these participants, the quality of staff and consumer connectedness, availability and consistency of material resources, and social support are as critical as more traditional health interventions to their satisfaction, motivation to participate, and willingness to refer others to the program. Women of color will often forego health services perceived as intimidating and/or culturally insensitive, but programs such as the Healthy Start Initiative offer a critical link that encourages participation and, as a result, improves maternal and child health status.
MX Resident Engineer Networking Guide.
1982-04-01
FIGURES 6 INTRODUCTION ............................................................ 11 Background Approach Purpose Scope 2 SYSTEM OVERVIEW...RESIDENT ENGINEER NETWORKING GUIDE 1 INTRODUCTION Background The Network Analysis System (NAS) is not a new planning method. It has been used for more than...DEVELOPMENT RUN DATE 19MAY7’ 2359MRS S U M M A R I P A Y N L N T S S T A I I M E N I PROJECT START jAUG ?? PROJECT EXR 4 L1 SAMPLE PNOPLEM *ACTIVITT-YN
26 CFR 301.7701(b)-4 - Residency time periods.
Code of Federal Regulations, 2010 CFR
2010-04-01
... for tax purposes on the alien's residency starting date. The residency starting date for an alien who... present in the United States. The residency starting date for an alien who meets the lawful permanent... permanent resident. The residency starting date for an alien who satisfies both the substantial presence...
Statistical Inference on Memory Structure of Processes and Its Applications to Information Theory
2016-05-12
ABSTRACT 2. REPORT TYPE 17. LIMITATION OF ABSTRACT 15. NUMBER OF PAGES 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 5c. PROGRAM ELEMENT...published that acknowledge ARO support from the start of the project to the date of this printing. List the papers, including journal references, in the...Patents Submitted Patents Awarded Awards Graduate Students Hee Sun Kim, a doctoral student, inducted in to Mu Sigma Rho, the National Statistics
Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1992.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority
1991-09-01
The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's plans for implementing the Program during Fiscal Year (FY) 1992. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1992 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of May 21, 1991. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-16) lists FY 1992 new-start projects. ''Ongoing'' status indicates that the project started in FY 1991 or before and that it is expected to continue through part or all of FY 1992. ''Deferred'' means that BPA implementation has been postponed to FY 1993 or later. ''Completed'' indicates completion during FY 1991. ''New'' denotes projects planned for BPA implementation in FY 1992. A number of projects are expected to begin in late FY 1991 and have been listed in Table 1 of the AIWP as ''Projected FY '91 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1991. These projects have been listed in Table 1 as ''Projected FY '91 Completions,'' based on their projected completion dates.« less
TEXAS TEACHER'S DAILY REGISTER FOR SCHOOL YEAR 1964-1965.
ERIC Educational Resources Information Center
El Paso Public Schools, TX.
AN ENROLLMENT CARD IS USED TO REGISTER PRESCHOOL CHILDREN IN PROJECT HEAD START. SPACE IS PROVIDED FOR NAME, SEX, PHONE, BIRTHDATE, RACE, BIRTHPLACE, AGE, AND AGE VERIFICATION AND OTHER PERTINENT INFORMATION ON THE CHILD'S FAMILY AS WELL AS THE DATE OF DISEASE IMMUNIZATIONS. THE PARENT OR GUARDIAN MUST SIGN THE ENROLLMENT CARD. A TEACHER-PUPIL…
Water Resources Research Grant Program Project Descriptions: Fiscal Year 1988
Lew, Melvin; McCoy, Beverly M.
1989-01-01
This report contains information on the 38 new projects funded by the U.S. Geological Survey's Water Resources Research Grant Program in fiscal year 1988 and on 11 projects completed during the year. For the new projects, the report gives the grant number, project title, performing organization, principal investigator(s), project duration, and a project description that includes: (1) identification of water-related problems and problem-solution approach, (2) contribution to problem solution, (3) objectives, and (4) approach. The 38 projects include 14 in the area of ground-water quality problems, 10 in the science and technology of water-quality management, 4 in climate variability and the hydrologic cycle, 7 in institutional change in water-resources management, and 3 in miscellaneous water-resources management problems. For the 11 completed projects, the report gives the grant number, project title, performing organization, principal investigator(s), starting date, date of receipt of final report, and an abstract of the final report. Each project description provides the information needed to obtain a copy of the final report. The report also contains tables showing (1) proposals received according to area of research interest, (2) grant awards and funding according to area of research interest, (3) proposals received according to type of submitting organization, and (4) awards and funding according to type of organization.
2015-12-23
papers submitted or published that acknowledge ARO support from the start of the project to the date of this printing. List the papers, including...1. Koide, S. & Sidhu, S.S. The importance of being tyrosine: lessons in molecular recognition from minimalist synthetic binding proteins. ACS
LDRD 2014 Annual Report: Laboratory Directed Research and Development Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hatton, Diane
Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy (DOE) in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2014, as required. In FY 2014, the BNL LDRD Program funded 40 projects, 8 of which were new starts, at a total cost of $9.6M.
LDRD 2012 Annual Report: Laboratory Directed Research and Development Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bookless, William
Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY2012, as required. In FY2012, the BNL LDRD Program funded 52 projects, 14 of which were new starts, at a total cost of $10,061,292.
LDRD 2015 Annual Report: Laboratory Directed Research and Development Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hatton, D.
Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy (DOE) in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2015, as required. In FY 2015, the BNL LDRD Program funded 43 projects, 12 of which were new starts, at a total cost of $9.5M.
Louisiana: a model for advancing regional e-Research through cyberinfrastructure.
Katz, Daniel S; Allen, Gabrielle; Cortez, Ricardo; Cruz-Neira, Carolina; Gottumukkala, Raju; Greenwood, Zeno D; Guice, Les; Jha, Shantenu; Kolluru, Ramesh; Kosar, Tevfik; Leger, Lonnie; Liu, Honggao; McMahon, Charlie; Nabrzyski, Jarek; Rodriguez-Milla, Bety; Seidel, Ed; Speyrer, Greg; Stubblefield, Michael; Voss, Brian; Whittenburg, Scott
2009-06-28
Louisiana researchers and universities are leading a concentrated, collaborative effort to advance statewide e-Research through a new cyberinfrastructure: computing systems, data storage systems, advanced instruments and data repositories, visualization environments and people, all linked together by software programs and high-performance networks. This effort has led to a set of interlinked projects that have started making a significant difference in the state, and has created an environment that encourages increased collaboration, leading to new e-Research. This paper describes the overall effort, the new projects and environment and the results to date.
26 CFR 1.415(b)-2 - Multiple annuity starting dates. [Reserved
Code of Federal Regulations, 2010 CFR
2010-04-01
... 26 Internal Revenue 5 2010-04-01 2010-04-01 false Multiple annuity starting dates. [Reserved] 1.415(b)-2 Section 1.415(b)-2 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY... Multiple annuity starting dates. [Reserved] ...
Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1991.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority
1990-09-01
The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's draft plans for implementing the Program during Fiscal Year (FY) 1991. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Items 10.1-10.3. The AIWP includes schedules with key milestones for 1 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of September 1, 1990. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-17) lists FY 1991 new-start projects. ''Ongoing'' status indicates that the project started in FY 1990 or before and that it is expected to continue through part or all of FY 1991. ''Deferred'' means that BPA implementation has been postponed to FY 1992 or later. ''Completed'' indicates completion during FY 1990. ''New'' denotes projects planned for BPA implementation in FY 1991. However, several of these new projects were still under review by the Policy Review Group as the FY 1991 AIWP went to press. The new projects still under review have been noted in Table 2 and in the text of the AIWP. A number of projects are expected to begin in late FY 1990 and have been listed in Table 1 of the Draft AIWP as ''Projected FY '90 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1990. These projects have been listed in Table 1 as ''Projected FY '90 Completions,'' based on their projected completion dates. Section VIII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.« less
Special Inspector General for Iraq Reconstruction (SIGIR): Moving Beyond the IRRF
2007-04-30
SCREEN 60” INSTANT CINEMA PROJECTION SCREEN ITEM# 20022351 SYTLES#: 60300 $12,750.00 $12,750.00 $0.00 CEFMS ISFF2 4/2/2007 3800 W91GY0-07-M-0163-NA-4...Generation: Baiji Gas 3&4 (318 MW – consisting of two Siemens 159 MW generators) Start Date: 11/24/2003 26 Back-Up Generators: 200 MW ( Japanese
NREL/SCE High Penetration PV Integration Project: FY13 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mather, B. A.; Shah, S.; Norris, B. L.
2014-06-01
In 2010, the National Renewable Energy Laboratory (NREL), Southern California Edison (SCE), Quanta Technology, Satcon Technology Corporation, Electrical Distribution Design (EDD), and Clean Power Research (CPR) teamed to analyze the impacts of high penetration levels of photovoltaic (PV) systems interconnected onto the SCE distribution system. This project was designed specifically to benefit from the experience that SCE and the project team would gain during the installation of 500 megawatts (MW) of utility-scale PV systems (with 1-5 MW typical ratings) starting in 2010 and completing in 2015 within SCE's service territory through a program approved by the California Public Utility Commissionmore » (CPUC). This report provides the findings of the research completed under the project to date.« less
Mining Program Source Code for Improving Software Quality
2013-01-01
conduct static verification on the software application under analysis to detect defects around APIs. (a) Papers published in peer-reviewed journals...N/A for none) Enter List of papers submitted or published that acknowledge ARO support from the start of the project to the date of this printing...List the papers , including journal references, in the following categories: Received Paper 05/06/2013 21.00 Tao Xie, Suresh Thummalapenta, David Lo
Louisiana: a model for advancing regional e-Research through cyberinfrastructure
Katz, Daniel S.; Allen, Gabrielle; Cortez, Ricardo; Cruz-Neira, Carolina; Gottumukkala, Raju; Greenwood, Zeno D.; Guice, Les; Jha, Shantenu; Kolluru, Ramesh; Kosar, Tevfik; Leger, Lonnie; Liu, Honggao; McMahon, Charlie; Nabrzyski, Jarek; Rodriguez-Milla, Bety; Seidel, Ed; Speyrer, Greg; Stubblefield, Michael; Voss, Brian; Whittenburg, Scott
2009-01-01
Louisiana researchers and universities are leading a concentrated, collaborative effort to advance statewide e-Research through a new cyberinfrastructure: computing systems, data storage systems, advanced instruments and data repositories, visualization environments and people, all linked together by software programs and high-performance networks. This effort has led to a set of interlinked projects that have started making a significant difference in the state, and has created an environment that encourages increased collaboration, leading to new e-Research. This paper describes the overall effort, the new projects and environment and the results to date. PMID:19451102
45 CFR 1304.2 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START... AGENCIES General § 1304.2 Effective date. Early Head Start and Head Start grantee and delegate agencies...
Teen dating abuse: recognition and interventions.
Freeman, Sally Ann; Rosenbluth, Barri; Cotton, Laura
2013-03-01
Teen dating abuse, also known as teen dating violence, is a significant public health issue. Adolescents with a history of dating abuse may struggle academically and experience increased risk for serious injury or even death. They may engage in risky sexual behavior, substance abuse, and unhealthy dieting and exhibit suicidal behaviors. School nurses may be the first adults that teens confide in when experiencing dating abuse and may lack the knowledge and skills to intervene with teens involved in unhealthy dating relationships. Beginning in 2008, Dell Children s Medical Center in Austin, Texas, partnered with SafePlace (a local nonprofit that serves survivors of sexual and domestic violence) to address dating abuse. This collaboration is part of Start Strong Austin, one of 11 communities nationwide participating in the Start Strong: Building Healthy Teen Relationships Initiative funded by the Robert Wood Johnson Foundation. The Start Strong model employs innovative strategies in education, community engagement, policy change, and social marketing to prevent dating abuse before it starts.
Denaire, Anthony; Lefranc, Philippe; Wahl, Joachim; Bronk Ramsey, Christopher; Dunbar, Elaine; Goslar, Tomasz; Bayliss, Alex; Beavan, Nancy; Bickle, Penny; Whittle, Alasdair
2017-01-01
Starting from questions about the nature of cultural diversity, this paper examines the pace and tempo of change and the relative importance of continuity and discontinuity. To unravel the cultural project of the past, we apply chronological modelling of radiocarbon dates within a Bayesian statistical framework, to interrogate the Neolithic cultural sequence in Lower Alsace, in the upper Rhine valley, in broad terms from the later sixth to the end of the fifth millennium cal BC. Detailed formal estimates are provided for the long succession of cultural groups, from the early Neolithic Linear Pottery culture (LBK) to the Bischheim Occidental du Rhin Supérieur (BORS) groups at the end of the Middle Neolithic, using seriation and typology of pottery as the starting point in modelling. The rate of ceramic change, as well as frequent shifts in the nature, location and density of settlements, are documented in detail, down to lifetime and generational timescales. This reveals a Neolithic world in Lower Alsace busy with comings and goings, tinkerings and adjustments, and relocations and realignments. A significant hiatus is identified between the end of the LBK and the start of the Hinkelstein group, in the early part of the fifth millennium cal BC. On the basis of modelling of existing dates for other parts of the Rhineland, this appears to be a wider phenomenon, and possible explanations are discussed; full reoccupation of the landscape is only seen in the Grossgartach phase. Radical shifts are also proposed at the end of the Middle Neolithic.
2015-01-14
Feb-2014 ABSTRACT Number of Papers published in peer-reviewed journals: Number of Papers published in non peer-reviewed journals: Final Report...educational impact of the STM/AFM. (a) Papers published in peer-reviewed journals (N/A for none) Enter List of papers submitted or published that acknowledge...ARO support from the start of the project to the date of this printing. List the papers , including journal references, in the following categories
Shock Tube/Laser Absorption Studies of Jet Fuels at Low Temperatures (600-1200K)
2013-08-27
diagnostics techniques; and the application of an aerosol shock tube to investigate low-vapor-pressure fuels. (a) Papers published in peer-reviewed...journals (N/A for none) Enter List of papers submitted or published that acknowledge ARO support from the start of the project to the date of this...printing. List the papers , including journal references, in the following categories: Received Paper 06/14/2011 6.00 Sung Hyun Pyun, Jungwan Cho, David
26 CFR 1.401(a)(4)-13 - Effective dates and fresh-start rules.
Code of Federal Regulations, 2010 CFR
2010-04-01
... harbors and the general test, respectively. Those fresh-start options are designed to allow a plan to be... benefits after the fresh-start date for employees in the fresh-start group are determined under one of the... reasonable, good faith interpretation of section 401(a)(4), taking into account pre-existing guidance and the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alan Black; Arnis Judzis
2003-10-01
This document details the progress to date on the OPTIMIZATION OF DEEP DRILLING PERFORMANCE--DEVELOPMENT AND BENCHMARK TESTING OF ADVANCED DIAMOND PRODUCT DRILL BITS AND HP/HT FLUIDS TO SIGNIFICANTLY IMPROVE RATES OF PENETRATION contract for the year starting October 2002 through September 2002. The industry cost shared program aims to benchmark drilling rates of penetration in selected simulated deep formations and to significantly improve ROP through a team development of aggressive diamond product drill bit--fluid system technologies. Overall the objectives are as follows: Phase 1--Benchmark ''best in class'' diamond and other product drilling bits and fluids and develop concepts for amore » next level of deep drilling performance; Phase 2--Develop advanced smart bit--fluid prototypes and test at large scale; and Phase 3--Field trial smart bit--fluid concepts, modify as necessary and commercialize products. Accomplishments to date include the following: 4Q 2002--Project started; Industry Team was assembled; Kick-off meeting was held at DOE Morgantown; 1Q 2003--Engineering meeting was held at Hughes Christensen, The Woodlands Texas to prepare preliminary plans for development and testing and review equipment needs; Operators started sending information regarding their needs for deep drilling challenges and priorities for large-scale testing experimental matrix; Aramco joined the Industry Team as DEA 148 objectives paralleled the DOE project; 2Q 2003--Engineering and planning for high pressure drilling at TerraTek commenced; 3Q 2003--Continuation of engineering and design work for high pressure drilling at TerraTek; Baker Hughes INTEQ drilling Fluids and Hughes Christensen commence planning for Phase 1 testing--recommendations for bits and fluids.« less
An improved robust buffer allocation method for the project scheduling problem
NASA Astrophysics Data System (ADS)
Ghoddousi, Parviz; Ansari, Ramin; Makui, Ahmad
2017-04-01
Unpredictable uncertainties cause delays and additional costs for projects. Often, when using traditional approaches, the optimizing procedure of the baseline project plan fails and leads to delays. In this study, a two-stage multi-objective buffer allocation approach is applied for robust project scheduling. In the first stage, some decisions are made on buffer sizes and allocation to the project activities. A set of Pareto-optimal robust schedules is designed using the meta-heuristic non-dominated sorting genetic algorithm (NSGA-II) based on the decisions made in the buffer allocation step. In the second stage, the Pareto solutions are evaluated in terms of the deviation from the initial start time and due dates. The proposed approach was implemented on a real dam construction project. The outcomes indicated that the obtained buffered schedule reduces the cost of disruptions by 17.7% compared with the baseline plan, with an increase of about 0.3% in the project completion time.
[From planning to realization of an electronic patient record].
Krämer, T; Rapp, R; Krämer, K L
1999-03-01
The high complex requirements on information and information flow in todays hospitals can only be accomplished by the use of modern Information Systems (IS). In order to achieve this, the Stiftung Orthopädische Universitätsklinik has carried out first the Project "Strategic Informations System Planning" in 1993. Then realizing the necessary infrastructure (network; client-server) from 1993 to 1997, and finally started the introduction of modern IS (SAP R/3 and IXOS-Archive) in the clinical area. One of the approved goal was the replacement of the paper medical record by an up-to-date electronical medical record. In this article the following three topics will be discussed: the difference between the up-to-date electronical medical record and the electronically archived finished cases, steps performed by our clinic to realize the up-to-date electronical medical record and the problems occurred during this process.
From planning to realisation of an electronic patient record.
Krämer, T; Rapp, R; Krämer, K-L
1999-03-01
The high complex requirements on information and information flow in todays hospitals can only be accomplished by the use of modern Information Systems (IS). In order to achieve this, the Stiftung Orthopädische Universitätsklinik has carried out first the Project "Strategic Informations System Planning" in 1993. Then realizing the neccessary infrastructure (network; client-server) from 1993 to 1997, and finally started the introduction of modern IS (SAP R/3 and IXOS-Archive) in the clinical area. One of the approved goal was the replacement of the paper medical record by an up-to-date electronical medical record. In this article the following three topics will be discussed: the difference between the up-to-date electronical medical record and the electronically archived finished cases, steps performed by our clinic to realize the up-to-date electronical medical record and the problems occured during this process.
[Efficient identification and analysis of low and medium frequency repeats]. Progress report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jurka, J.
1991-08-28
The effective starting date of this grant was May 15. In the first three months of this project we focused primarily on organizational and technical aspects of our research which included: organization of the database of repeats in primates; preparation of software for rapid and sensitive search of novel repetitive elements in GenBank; purchase and installation of the Sun workstation; and research on the mammal-specific MAR1 family of repetitive elements (to be communicated in October).
(Efficient identification and analysis of low and medium frequency repeats)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jurka, J.
1991-08-28
The effective starting date of this grant was May 15. In the first three months of this project we focused primarily on organizational and technical aspects of our research which included: organization of the database of repeats in primates; preparation of software for rapid and sensitive search of novel repetitive elements in GenBank; purchase and installation of the Sun workstation; and research on the mammal-specific MAR1 family of repetitive elements (to be communicated in October).
20 CFR 218.26 - Work started after annuity beginning date.
Code of Federal Regulations, 2010 CFR
2010-04-01
... rights to return to work for a railroad employee before starting any new work. (2) Age annuity. An... employee, spouse or divorced spouse gives up all rights to return to work for a railroad employer before... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Work started after annuity beginning date...
NASA Technical Reports Server (NTRS)
Bullington, J. V.; Winkler, J. C.; Linton, D. G.; Khajenoori, S.
1995-01-01
The NASA Shuttle Logistics Depot (NSLD) is tasked with the responsibility for repair and manufacture of Line Replaceable Unit (LRU) hardware and components to support the Space Shuttle Orbiter. Due to shrinking budgets, cost effective repair of LRU's becomes a primary objective. To achieve this objective, is imperative that resources be assigned to those LRU's which have the greatest expectation of being needed as a spare. Forecasting the times at which spares are needed requires consideration of many significant factors including: failure rate, flight rate, spares availability, and desired level of support, among others. This paper summarizes the results of the research and development work that has been accomplished in producing an automated tool that assists in the assignment of effective repair start-times for LRU's at the NSLD. This system, called the Repair Start-time Assessment System (RSAS), uses probabilistic modeling technology to calculate a need date for a repair that considers the current repair pipeline status, as well as, serviceable spares and projections of future demands. The output from the system is a date for beginning the repair that has significantly greater confidence (in the sense that a desired probability of support is ensured) than times produced using other techniques. Since an important output of RSAS is the longest repair turn-around time that will ensure a desired probability of support, RSAS has the potential for being applied to operations at any repair depot where spares are on-hand and repair start-times are of interest. In addition, RSAS incorporates tenants of Just-in-Time (JIT) techniques in that the latest repair start-time (i.e., the latest time at which repair resources must be committed) may be calculated for every failed unit This could reduce the spares inventory for certain items, without significantly increasing the risk of unsatisfied demand.
26 CFR 1.401(a)(4)-13 - Effective dates and fresh-start rules.
Code of Federal Regulations, 2011 CFR
2011-04-01
...), relating to the safe harbors and the general test, respectively. Those fresh-start options are designed to... and have at least one hour of service with the employer after that date. However, a fresh-start group... a reasonable, good faith interpretation of section 401(a)(4), taking into account pre-existing...
26 CFR 1.401(a)(4)-13 - Effective dates and fresh-start rules.
Code of Federal Regulations, 2012 CFR
2012-04-01
...), relating to the safe harbors and the general test, respectively. Those fresh-start options are designed to... and have at least one hour of service with the employer after that date. However, a fresh-start group... a reasonable, good faith interpretation of section 401(a)(4), taking into account pre-existing...
26 CFR 1.401(a)(4)-13 - Effective dates and fresh-start rules.
Code of Federal Regulations, 2014 CFR
2014-04-01
...), relating to the safe harbors and the general test, respectively. Those fresh-start options are designed to... and have at least one hour of service with the employer after that date. However, a fresh-start group... a reasonable, good faith interpretation of section 401(a)(4), taking into account pre-existing...
26 CFR 1.401(a)(4)-13 - Effective dates and fresh-start rules.
Code of Federal Regulations, 2013 CFR
2013-04-01
...), relating to the safe harbors and the general test, respectively. Those fresh-start options are designed to... and have at least one hour of service with the employer after that date. However, a fresh-start group... a reasonable, good faith interpretation of section 401(a)(4), taking into account pre-existing...
Final Report for Project DE-FG02-05ER15718 Fluoropolymers, Electrolytes, Composites and Electrodes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Creager, Stephen
This report is for a project that was initiated under the title “New Proton-Conducting Fluoropolymer Electrolytes for PEM Fuel Cells”, as part of the DOE program titled “Basic Research for the Hydrogen Fuel Cell Initiative”, Program Notice DE-FG01-04ER04-20. The project received 750,000 dollars in initial funding for a three-year term with a start date of August 15, 2005. Creager was PI and co-PIs were DesMarteau and Smith, all from Clemson. The project was renewed for a second three-year term with a start date of June 15 2008, again for 750,000 dollars, with the new title, “Fluoropolymers, Electrolytes, Composites and Electrodes”.more » Shortly after the renewal was put in place, co-PI Smith left Clemson to accept a position at the University of Texas at Dallas. After a period of no-cost extension the project was renewed on January 1 2013 for another three-year term, this time for a smaller amount ($525,000) and with Thrasher, a new senior hire at Clemson, as co-PI in place of Smith. DesMarteau had retired from Clemson by this time but was retained as a project advisor. After a final one-year no-cost extension for calendar year 2016, the project ended on December 31, 2016, giving it an active period of eleven and one-half years, from August 15 2005 to December 31 2016. The overall objective of this research project has been to create and understand the behavior of new fluoropolymer-based electrolytes and electrodes suitable for use in electrochemical energy storage and conversion devices. The objective was pursued via research on new fluorinated monomers, new polymers and polyelectrolytes (also known as ionomers), and new electrocatalyst supports that in some cases include chemically grafted electrolytes to promote rapid ion transport to electrocatalytically active sites (usually platinum nanoparticles) on the support. The research involved synthesis and characterization of new materials, and creation and use of new measurement techniques that address key properties of the materials, e.g. mixed electronic / ionic conduction in the absence of liquid electrolyte, that are relevant to their use in energy conversion and storage.« less
NASA Technical Reports Server (NTRS)
Bridges, James
2007-01-01
At this, the first year-end meeting of the Fundamental Aeronautics Program, an overview of the Airport Noise discipline of the Supersonics Project leads the presentation of technical plans and achievements in this area of the Project. The overview starts by defining the Technical Challenges targeted by Airport Noise efforts, and the Approaches planned to meet these challenges. These are fleshed out in Elements, namely Prediction, Diagnostics, and Engineering, and broken down into Tasks. The Tasks level is where individual researchers' work is defined and from whence the technical presentations to follow this presentation come. This overview also presents the Milestones accomplished to date and to be completed in the next year. Finally, the NASA Research Announcement cooperative agreement activities are covered and tied to the Tasks and Milestones.
The Mario Schenberg Gravitational Wave Antenna
NASA Astrophysics Data System (ADS)
Oliveira, Nei F.; Aguiar, Odylio D.
2016-10-01
This article is an account of the work done in the Mario Schenberg gravitational wave antenna up to date, focusing mainly in the participation of the Laboratório de Estado Sólido e Baixas Temperaturas (LESBT) do Instituto de Física da Universidade de S. Paulo. The text starts with an introduction describing the problem, the Brazilian project, and the participant institutions. This is followed by a description of the construction of the infrastructure, initial tests, and final basic assembly at the LESBT. Results are presented for the thermal and mechanical behaviors of the cryogenic system and for the development of active transducers in its various stages, culminating with the last version in which the project sensitivity of ˜4 × 10-20 Hz-1/2 was attained.
UMD Workshop on Distributed Sensing, Actuation, and Control for Bio-Inspired Soft Robotics
2014-10-01
advancements in smart materials and 3D printing. (a) Papers published in peer-reviewed journals (N/A for none) Enter List of papers submitted or published...that acknowledge ARO support from the start of the project to the date of this printing. List the papers, including journal references, in the... polyurethane used in stretchable electronics is sold in units of tons, whereas most research purposes would need much smaller
2016-01-23
a) Papers published in peer-reviewed journals (N/A for none) Enter List of papers submitted or published that acknowledge ARO support from the start...of the project to the date of this printing. List the papers , including journal references, in the following categories: 11.00 10.00 20.00 18.00...Received Paper 1.00 4.00 3.00 2.00 5.00 8.00 Huan Lin, Shen Xu, Chong Li, Hua Dong, Xinwei Wang. Thermal and electrical conduction in 6.4 nm thin gold films
Wai, Pyae Phyo; Shewade, Hemant Deepak; Kyaw, Nang Thu Thu; Thein, Saw; Si Thu, Aung; Kyaw, Khine Wut Yee; Aye, Nyein Nyein; Phyo, Aye Mon; Maung, Htet Myet Win; Soe, Kyaw Thu; Aung, Si Thu
2018-01-01
The Union in collaboration with national TB programme (NTP) started the community-based MDR-TB care (CBMDR-TBC) project in 33 townships of upper Myanmar to improve treatment initiation and treatment adherence. Patients with MDR-TB diagnosed/registered under NTP received support through the project staff, in addition to the routine domiciliary care provided by NTP staff. Each township had a project nurse exclusively for MDR-TB and 30 USD per month (max. for 4 months) were provided to the patient as a pre-treatment support. To assess whether CBMDR-TBC project's support improved treatment initiation. In this cohort study (involving record review) of all diagnosed MDR-TB between January 2015 and June 2016 in project townships, CBMDR-TBC status was categorized as "receiving support" if date of project initiation in patient's township was before the date of diagnosis and "not receiving support", if otherwise. Cox proportional hazards regression (censored on 31 Dec 2016) was done to identify predictors of treatment initiation. Of 456 patients, 57% initiated treatment: 64% and 56% among patients "receiving support (n = 208)" and "not receiving support (n = 228)" respectively (CBMDR-TBC status was not known in 20 (4%) patients due to missing diagnosis dates). Among those initiated on treatment (n = 261), median (IQR) time to initiate treatment was 38 (20, 76) days: 31 (18, 50) among patients "receiving support" and 50 (26,101) among patients "not receiving support". After adjusting other potential confounders (age, sex, region, HIV, past history of TB treatment), patients "receiving support" had 80% higher chance of initiating treatment [aHR (0.95 CI): 1.8 (1.3, 2.3)] when compared to patients "not receiving support". In addition, age 15-54 years, previous history of TB and being HIV negative were independent predictors of treatment initiation. Receiving support under CBMDR-TBC project improved treatment initiation: it not only improved the proportion initiated but also reduced time to treatment initiation. We also recommend improved tracking of all diagnosed patients as early as possible.
Projections of Future Summer Weather in Seoul and Their Impacts on Urban Agriculture
NASA Astrophysics Data System (ADS)
Kim, S. O.; Kim, J. H.; Yun, J. I.
2015-12-01
Climate departure from the past variability was projected to start in 2042 for Seoul. In order to understand the implication of climate departure in Seoul for urban agriculture, we evaluated the daily temperature for the June-September period from 2041 to 2070, which were projected by the RCP8.5 climate scenario. These data were analyzed with respect to climate extremes and their effects on growth of hot pepper (Capsicum annuum), one of the major crops in urban farming. The mean daily maximum and minimum temperatures in 2041-2070 approached to the 90th percentile in the past 30 years (1951- 1980). However, the frequency of extreme events such as heat waves and tropical nights appeared to exceed the past variability. While the departure of mean temperature might begin in or after 2040, the climate departure in the sense of extreme weather events seems already in progress. When the climate scenario data were applied to the growth and development of hot pepper, the departures of both planting date and harvest date are expected to follow those of temperature. However, the maximum duration for hot pepper cultivation, which is the number of days between the first planting and the last harvest, seems to have already deviated from the past variability.
Cyclone Center: Insights on Historical Tropical Cyclones from Citizen Volunteers
NASA Astrophysics Data System (ADS)
Thorne, P.; Hennon, C. C.; Knapp, K. R.; Schreck, C. J., III; Stevens, S. E.; Kossin, J. P.; Rennie, J.; Hennon, P. A.; Kruk, M. C.
2015-12-01
The cyclonecenter.org project started in fall 2012 and has been collecting citizen scientist volunteer tropical cyclone intensity estimates ever since. The project is hosted by the Citizen Science Alliance (zooniverse) and the platform is supported by a range of scientists. We have over 30 years of satellite imagery of tropical cyclones but the analysis to date has been done on an ocean-basin by ocean-basin basis and worse still practices have changed over time. We therefore do not, presently, have a homogeneous record relevant for discerning climatic changes. Automated techniques can classify many of the images but have a propensity to be challenged during storm transitions. The problem is fundamentally one where many pairs of eyes are invaluable as there is no substitute for human eyes in discerning patterns. Each image is classified by ten unique users before it is retired. This provides a unique insight into the uncertainty inherent in classification. In the three years of the project much useful data has accrued. This presentation shall highlight some of the results and analyses to date and touch on insights as to what has worked and what perhaps has not worked so well. There are still many images left to complete so its far from too late to jump over to www.cyclonecenter.org and help out.
2017-10-01
Colonization PRINCIPAL INVESTIGATOR: Srinivas Nandana CONTRACTING ORGANIZATION: Cedars-Sinai Medical Center Los Angeles, CA, 90048 REPORT DATE...8. PERFORMING ORGANIZATION REPORT NUMBER Cedars-Sinai Medical Center, 8700 Beverly Blvd, Los Angeles, CA, 90048 9. SPONSORING / MONITORING...Revised Statement of Work (SOW): PROPOSED START DATE Sep 30, 2016 ACTUAL START DATE – Sep 18, 2017 Site: Uro -Oncology, Dept of Medicine
7 CFR 3015.22 - Starting date of retention period.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 15 2010-01-01 2010-01-01 false Starting date of retention period. 3015.22 Section 3015.22 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER, DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Record Retention and...
Region 2 2016 Title V Operating Permits
This table lists proposed Title V permits submitted received by EPA in 2016 and undergoing EPA’s 45 day review, including the start and expiration dates for EPA's 45 day review period. It also shows the start and expiration dates for the public's 60 day
Shewade, Hemant Deepak; Kyaw, Nang Thu Thu; Thein, Saw; Si Thu, Aung; Kyaw, Khine Wut Yee; Aye, Nyein Nyein; Phyo, Aye Mon; Maung, Htet Myet Win; Soe, Kyaw Thu; Aung, Si Thu
2018-01-01
Background The Union in collaboration with national TB programme (NTP) started the community-based MDR-TB care (CBMDR-TBC) project in 33 townships of upper Myanmar to improve treatment initiation and treatment adherence. Patients with MDR-TB diagnosed/registered under NTP received support through the project staff, in addition to the routine domiciliary care provided by NTP staff. Each township had a project nurse exclusively for MDR-TB and 30 USD per month (max. for 4 months) were provided to the patient as a pre-treatment support. Objectives To assess whether CBMDR-TBC project’s support improved treatment initiation. Methods In this cohort study (involving record review) of all diagnosed MDR-TB between January 2015 and June 2016 in project townships, CBMDR-TBC status was categorized as “receiving support” if date of project initiation in patient’s township was before the date of diagnosis and “not receiving support”, if otherwise. Cox proportional hazards regression (censored on 31 Dec 2016) was done to identify predictors of treatment initiation. Results Of 456 patients, 57% initiated treatment: 64% and 56% among patients “receiving support (n = 208)” and “not receiving support (n = 228)” respectively (CBMDR-TBC status was not known in 20 (4%) patients due to missing diagnosis dates). Among those initiated on treatment (n = 261), median (IQR) time to initiate treatment was 38 (20, 76) days: 31 (18, 50) among patients “receiving support” and 50 (26,101) among patients “not receiving support”. After adjusting other potential confounders (age, sex, region, HIV, past history of TB treatment), patients “receiving support” had 80% higher chance of initiating treatment [aHR (0.95 CI): 1.8 (1.3, 2.3)] when compared to patients “not receiving support”. In addition, age 15–54 years, previous history of TB and being HIV negative were independent predictors of treatment initiation. Conclusion Receiving support under CBMDR-TBC project improved treatment initiation: it not only improved the proportion initiated but also reduced time to treatment initiation. We also recommend improved tracking of all diagnosed patients as early as possible. PMID:29596434
40 CFR 792.113 - Mixtures of substances with carriers.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Mixtures of substances with carriers... facility or the sponsor before the experimental start date. (3) To determine the stability of the test, control or reference substance in the mixture before the experimental start date or concomitantly...
40 CFR 792.105 - Test, control, and reference substance characterization.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Test, control, and reference substance... shall be determined by the testing facility or the sponsor before the experimental start date. The stability of the test, control or reference substance shall be determined before the experimental start date...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-16
... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Major Capital Investment Projects; Guidance on News Starts/Small Starts Policies and Procedures AGENCY: Federal Transit Administration (FTA... Administration (FTA) to publish policy guidance on the New and Small Starts capital project review and evaluation...
Fleming, Charles B; Lee, Christine M; Rhew, Isaac C; Ramirez, Jason J; Abdallah, Devon Alisa; Fairlie, Anne M
2018-05-08
Prior research on romantic relationships and alcohol use among young adults has not distinguished between differences in patterns of relationship status over extended periods of time and within-person changes in status that only occur for some individuals. This study captured between-person differences in relationship patterns, assessed associations between relationship patterns and alcohol use, and examined within-person associations between alcohol use and relationship status changes. In addition, age and sex differences in between- and within-person associations were tested. We used multilevel modeling of monthly data collected over one year on alcohol use and romantic relationship status from a Seattle area community sample of 620 young adults (ages 18-24). Participants were coded into six relationship pattern groups: (1) single-not-dating (16%), (2) stable-in-a-relationship (30%), (3) single-dating (10%), (4) ended-a-relationship (14%), (5) started-a-relationship (13%), and (6) ended-and-started-a-relationship (18%). Single-not-dating and stable-in-a-relationship groups reported the least drinking across the entire year; the single-dating, ended-a-relationship, and ended-and-started-a-relationship groups reported higher levels of drinking. Examining within-person changes in groups 3-6 revealed increases in drinking associated with months of dating among the single-dating group, months postbreakup among the ended-a-relationship group, and months of breaking up and starting a new relationship among the ended-and-started-a-relationship group. Few differences by age or sex were found for between- or within-person associations. The findings point to heterogeneity in patterns of relationship status over time, differences in relationship patterns associated with variations in drinking, and particular time points of elevated risk for young adults who experience changes in status.
VizieR Online Data Catalog: 280 one-opposition near Earth asteroids (Vaduvescu+, 2018)
NASA Astrophysics Data System (ADS)
Vaduvescu, O.; Hudin, L.; Mocnik, T.; Char, F.; Sonka, A.; Tudor, V.; Ordonez-Etxeberria, I.; Diaz Alfaro, M.; Ashley, R.; Errmann, R.; Short, P.; Moloceniuc, A.; Cornea, R.; Inceu, V.; Zavoianu, D.; Popescu, M.; Curelaru, L.; Mihalea, S.; Stoian, A.-M.; Boldea, A.; Toma, R.; Fields, L.; Grigore, V.; Stoev, H.; Lopez-Martinez, F.; Humphries, N.; Sowicka, P.; Ramanjooloo, Y.; Manilla-Robles, A.; Riddick, F. C.; Jimenez-Lujan, F.; Mendez, J.; Aceituno, F.; Sota, A.; Jones, D.; Hidalgo, S.; Murabito, S.; Oteo, I.; Bongiovanni, A.; Zamora, O.; Pyrzas, S.; Tanausu, R.; Font, J.; Bereciartua, A.; Perez-Fournon, I.; Martinez-Vazquez, C. E.; Monelli, M.; Cicuendez, L.; Monteagudo, L.; Agulli, I.; Bouy, H.; Huelamo, N.; Monguio, M.; Gaensicke, B. T.; Steeghs, D.; Gentile-Fusillo, N. P.; Hollands, M. A.; Toloza, O.; Manser, C. J.; Dhillon, V.; Sahman, D.; Fitzsimmons, A.; McNeill, A.; Thompson, A.; Tabor, M.; Murphy, D. N. A.; Davies, J.; Snodgrass, C.; Triaud, A. H. M. J.; Groot, P. J.; Macfarlane, S.; Peletier, R.; Sen, S.; Ikiz, T.; Hoekstra, H.; Herbonnet, R.; Koehlinger, F.; Greimel, R.; Afonso, A.; Parker, Q. A.; Kong, A. K. H.; Bassa, C.; Pleunis, Z.
2017-10-01
Table 2 lists the observing log of the EURONEAR 2013-2016 one-opposition near Earth asteroids (NEAs) recovery project. The Tables includes 457 observed fields (437 using the INT, 12 using the WHT and 4 using the OGS). We ordered the table based on the asteroid designation (first column) then the observing date (start night), listing the apparent magnitude V (according to MPC ephemerides), the proper motion miu and the positional uncertainty of the targets (as shown on the observing date by MPC at 3σ level), the number of acquired images (including nearby fields), and the exposure time (in seconds). In the last three columns we list the current status of the targets (as classified in the paper by Aug 2017), the MPS publication that includes our recovery, and some comments that can include the PHA classification, other used telescopes (WHT or OGS), the track-and-stack technique (TS, whenever used), other possible external stations (MPC observatory code) and the date of later recovery (given only for later recoveries when we were unable to find the targets or for joined simultaneous recoveries). (1 data file).
Trends and Variability of the Outdoor Skating Season in Canada during 1951-2005
NASA Astrophysics Data System (ADS)
Damyanov, Nikolay Nikolaev
Climate change affects a range of human activities, including one of Canada's prime sources of entertainment: ice skating. Whether done recreationally or as hockey, its outdoor component is heavily dependent on weather and climate. Based on information obtained from public works officials from various Canadian cities, I have established a meteorological criterion for the initiation of an outdoor skating season (OSS) as the last day in a sequence of the first three consecutive fall/winter days with a maximum temperature below -5 °C. In addition, I derive a proxy of the OSS length, defined as the total number of days with a maximum temperature below -5 °C after the OSS start date and before the start of March. Using these filters, I have extracted the start dates and the lengths of the OSS for each year during the fifty-five year period 1951-2005 from a comprehensive daily temperature dataset (Vincent et al., 2002). For each station, I created time series of both the OSS start dates and OSS lengths, and calculated the magnitude, sign and statistical significance of the slopes of the best-fit lines to each time series. In order to establish a relationship of the OSS with large-scale climate patterns, I grouped stations into six climatic regions. Depending on location, I then tested each region for correlation with the Pacific North-American teleconnection pattern (PNA) or the North Atlantic Oscillation (NAO), using a composite analysis method. Lastly, I removed the signal due to these climate fluctuations from the OSS start date and length trends in order to determine how much of the variability was caused by these interannual climate oscillations. The results of the study indicate that most stations in British Columbia and southwest Alberta, as well as these in the southern Ontario/Quebc region have witnessed a progressively later onset of the OSS over time. The Prairies, northwest Canada, and some Maritime locales show the opposite trend, although the magnitudes of the slopes are smaller. Significance tests on the regression lines show that most of these trends are not significant at the 95% level. However, OSS start dates in western Canada are very well correlated with PNA patterns by happening later on the average whenever PNA is positive and more warm air is channeled towards the west coast; the OSS start dates in eastern Canada show a similar connection with the NAO. The OSS lengths exhibit different trends: five of the six regions show a decrease in OSS length with the only region having experienced a lengthening of the OSS being the Maritimes. The statistical significance of the OSS length slopes is much higher than that of OSS start slopes, and the correlation with the PNA or NAO is similar in both cases. After carrying out the last procedure (removal of the PNA and NAO signals from the OSS start date and length series), I found an increase in the new slopes and their significance for more than half of my geographic regions' OSS start date and length trends.
Inferring pregnancy episodes and outcomes within a network of observational databases
Ryan, Patrick; Fife, Daniel; Gifkins, Dina; Knoll, Chris; Friedman, Andrew
2018-01-01
Administrative claims and electronic health records are valuable resources for evaluating pharmaceutical effects during pregnancy. However, direct measures of gestational age are generally not available. Establishing a reliable approach to infer the duration and outcome of a pregnancy could improve pharmacovigilance activities. We developed and applied an algorithm to define pregnancy episodes in four observational databases: three US-based claims databases: Truven MarketScan® Commercial Claims and Encounters (CCAE), Truven MarketScan® Multi-state Medicaid (MDCD), and the Optum ClinFormatics® (Optum) database and one non-US database, the United Kingdom (UK) based Clinical Practice Research Datalink (CPRD). Pregnancy outcomes were classified as live births, stillbirths, abortions and ectopic pregnancies. Start dates were estimated using a derived hierarchy of available pregnancy markers, including records such as last menstrual period and nuchal ultrasound dates. Validation included clinical adjudication of 700 electronic Optum and CPRD pregnancy episode profiles to assess the operating characteristics of the algorithm, and a comparison of the algorithm’s Optum pregnancy start estimates to starts based on dates of assisted conception procedures. Distributions of pregnancy outcome types were similar across all four data sources and pregnancy episode lengths found were as expected for all outcomes, excepting term lengths in episodes that used amenorrhea and urine pregnancy tests for start estimation. Validation survey results found highest agreement between reviewer chosen and algorithm operating characteristics for questions assessing pregnancy status and accuracy of outcome category with 99–100% agreement for Optum and CPRD. Outcome date agreement within seven days in either direction ranged from 95–100%, while start date agreement within seven days in either direction ranged from 90–97%. In Optum validation sensitivity analysis, a total of 73% of algorithm estimated starts for live births were in agreement with fertility procedure estimated starts within two weeks in either direction; ectopic pregnancy 77%, stillbirth 47%, and abortion 36%. An algorithm to infer live birth and ectopic pregnancy episodes and outcomes can be applied to multiple observational databases with acceptable accuracy for further epidemiologic research. Less accuracy was found for start date estimations in stillbirth and abortion outcomes in our sensitivity analysis, which may be expected given the nature of the outcomes. PMID:29389968
2016-01-01
Uganda does not produce hydrocarbons currently, but after discovering oil ten years ago, the country is expected to start producing oil within the next decade. Commercial oil production is expected to start at the earliest in 2020 but most likely beyond this period. The production start date has been pushed back several times in the past. Contractual and tax disputes, differences between the Ugandan government and international investors over the portion of oil production to be exported versus refined locally, and disagreements over the export pipeline route have all contributed to a later-than-expected production start date. Sustained low global oil prices have also contributed to delays.
Easing the Transition from Preschool to Kindergarten.
ERIC Educational Resources Information Center
Waxler, Trellis; And Others
1990-01-01
Describes two Head Start projects designed to make the transition from preschool to kindergarten less stressful for Head Start children and their families. Programs are the Mille Lacs Reservation Head Start program in Minnesota and the East Coast Migrant Head Start project in Fort Pierce, Florida. Project evaluations are summarized. (BB)
Even Start Projects Serving Migrant Families: Resource Guide.
ERIC Educational Resources Information Center
Gonzales, Miriam; Goldstein, David; Stief, Elizabeth; Fiester, Leila; Weiner, Lisa; Waiters, Katrina
Even Start was created by federal legislation to address poverty and illiteracy among low-income families by integrating early childhood education, adult literacy or adult basic education, and parenting education into a unified family literacy program. Migrant Education Even Start (MEES) projects resemble other Even Start projects but are affected…
Long-term projections and acclimatization scenarios of temperature-related mortality in Europe.
Ballester, Joan; Robine, Jean-Marie; Herrmann, François Richard; Rodó, Xavier
2011-06-21
The steady increase in greenhouse gas concentrations is inducing a detectable rise in global temperatures. The sensitivity of human societies to warming temperatures is, however, a transcendental question not comprehensively addressed to date. Here we show the link between temperature, humidity and daily numbers of deaths in nearly 200 European regions, which are subsequently used to infer transient projections of mortality under state-of-the-art high-resolution greenhouse gas scenario simulations. Our analyses point to a change in the seasonality of mortality, with maximum monthly incidence progressively shifting from winter to summer. The results also show that the rise in heat-related mortality will start to completely compensate the reduction of deaths from cold during the second half of the century, amounting to an average drop in human lifespan of up 3-4 months in 2070-2100. Nevertheless, projections suggest that human lifespan might indeed increase if a substantial degree of adaptation to warm temperatures takes place.
Magnetic mapping of Spanish Canary archipelago [ZEEE project
NASA Astrophysics Data System (ADS)
Catalan, M.; Martin, J.; Marin, J. A.; Agudo, L. M.
2003-04-01
The Spanish Exclusive Economic Zone [ZEEE] Project constitutes the most intensive mapping to date of the sea floor off Spain's coast. This extensive geophysical survey is being undertaken by a Spanish government team. The first phase [1995-1997] concentrated its efforts in the Balearic sea. The geomagnetic data acquired for this area, has already being reduced and stored as a data base, and six scalar magnetic anomaly maps have been produced at a scale of 1:200.000, and another that cover the whole zone at a scale of 1:500.000. Since 1998, the Project has systematically surveyed the Canary archipelago, ending on October 2002. This group of islands, located off the West African Continental Margin, conform an intraplate volcanic archipelago which reflects a magmatic story that started probably at Tertiary. This Communication describes its main technical details, discusses the scalar magnetic map and presents a regional analysis of the Canary islands magnetic picture, trying to identify the different intra-crustal structures which generate the anomalies.
Solenoid-free plasma start-up in spherical tokamaks
NASA Astrophysics Data System (ADS)
Raman, R.; Shevchenko, V. F.
2014-10-01
The central solenoid is an intrinsic part of all present-day tokamaks and most spherical tokamaks. The spherical torus (ST) confinement concept is projected to operate at high toroidal beta and at a high fraction of the non-inductive bootstrap current as required for an efficient reactor system. The use of a conventional solenoid in a ST-based fusion nuclear facility is generally believed to not be a possibility. Solenoid-free plasma start-up is therefore an area of extensive worldwide research activity. Solenoid-free plasma start-up is also relevant to steady-state tokamak operation, as the central transformer coil of a conventional aspect ratio tokamak reactor would be located in a high radiation environment but would be needed only during the initial discharge initiation and current ramp-up phases. Solenoid-free operation also provides greater flexibility in the selection of the aspect ratio and simplifies the reactor design. Plasma start-up methods based on induction from external poloidal field coils, helicity injection and radio frequency current drive have all made substantial progress towards meeting this important need for the ST. Some of these systems will now undergo the final stages of test in a new generation of large STs, which are scheduled to begin operations during the next two years. This paper reviews research to date on methods for inducing the initial start-up current in STs without reliance on the conventional central solenoid.
GOES Full Disk Shows First Day of Spring in the Northern Hemisphere
2014-03-20
This full-disk image from NOAA’s GOES-13 satellite was captured at 11:45 UTC (7:45 a.m. EDT) and shows the Americas on March 20, 2014. This date marks the start of astronomical spring in the northern hemisphere. Credit: NOAA/NASA GOES Project NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram
ERIC Educational Resources Information Center
Levin, Marjorie; Gamse, Beth; Swartz, Janet; Tao, Fumiyo; Tarr, Hope
In fall 1994, 14 state Migrant Education Programs were receiving direct federal grants to administer Migrant Even Start projects. These projects provide migrant families with an integrated program of early childhood education, adult education, and parenting education. As part of the national evaluation of the Even Start Family Literacy Program,…
NASA Astrophysics Data System (ADS)
Hermanns, R. L.; Zentel, K.-O.; Wenzel, F.; Hövel, M.; Hesse, A.
In order to benefit from synergies and to avoid replication in the field of disaster re- duction programs and related scientific projects it is important to create an overview on the state of art, the fields of activity and their key aspects. Therefore, the German Committee for Disaster Reduction intends to document projects and institution related to natural disaster prevention in three databases. One database is designed to docu- ment scientific programs and projects related to natural hazards. In a first step data acquisition concentrated on projects carried out by German institutions. In a second step projects from all other European countries will be archived. The second database focuses on projects on early-warning systems and has no regional limit. Data mining started in November 2001 and will be finished soon. The third database documents op- erational projects dealing with disaster prevention and concentrates on international projects or internationally funded projects. These databases will be available on the internet end of spring 2002 (http://www.dkkv.org) and will be updated continuously. They will allow rapid and concise information on various international projects, pro- vide up-to-date descriptions, and facilitate exchange as all relevant information in- cluding contact addresses are available to the public. The aim of this contribution is to present concepts and the work done so far, to invite participation, and to contact other organizations with similar objectives.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Status. (5) If you had a SSM during the reporting period and you took actions consistent with your SSM... periods of SSM. (i) The date and time that each malfunction started and stopped. (ii) The dates and times... started and stopped, and whether each deviation occurred during a period of SSM, or during another period...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Status. (5) If you had a SSM during the reporting period and you took actions consistent with your SSM... periods of SSM. (i) The date and time that each malfunction started and stopped. (ii) The dates and times... started and stopped, and whether each deviation occurred during a period of SSM, or during another period...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Status. (5) If you had a SSM during the reporting period and you took actions consistent with your SSM... periods of SSM. (i) The date and time that each malfunction started and stopped. (ii) The dates and times... started and stopped, and whether each deviation occurred during a period of SSM, or during another period...
Registration practices for observational studies on ClinicalTrials.gov indicated low adherence.
Boccia, Stefania; Rothman, Kenneth J; Panic, Nikola; Flacco, Maria Elena; Rosso, Annalisa; Pastorino, Roberta; Manzoli, Lamberto; La Vecchia, Carlo; Villari, Paolo; Boffetta, Paolo; Ricciardi, Walter; Ioannidis, John P A
2016-02-01
The study aims to assess the status of registration of observational studies. We identified studies on cancer research with prospective recruitment of participants that were registered from February 2000 to December 2011 in ClinicalTrials.gov. We recorded the dates of registration and start of recruitment, outcomes, and description of statistical method. We searched for publications corresponding to the registered studies through May 31, 2014. One thousand one hundred nine registered studies were eligible. Primary and secondary outcomes were reported in 809 (73.0%) and 464 (41.8%) of them. The date of registration preceded the month of the study start in 145 (13.8%) and coincided in 205 (19.5%). A total of 151 publications from 120 (10.8%) registered studies were identified. In 2 (33.3%) of the 6 publications where ClinicalTrials.gov reported that the study started recruitment after registration, and in 9 (50.0%) of 18 publications where ClinicalTrials.gov reported the same date for registration and start of recruitment, the articles showed that the study had actually started recruiting before registration. During the period reviewed, few observational studies have been registered. Registration usually occurred after the study started, and prespecification of outcomes and statistical analysis rarely occurred. Copyright © 2016 Elsevier Inc. All rights reserved.
Best practices for the 3D documentation of the Grotta dei Cervi of Porto Badisco, Italy
NASA Astrophysics Data System (ADS)
Beraldin, J. A.; Picard, M.; Bandiera, A.; Valzano, V.; Negro, F.
2011-03-01
The Grotta dei Cervi is a Neolithic cave where human presence has left many unique pictographs on the walls of many of its chambers. It was closed for conservation reasons soon after its discovery in 1970. It is for these reasons that a 3D documentation was started. Two sets of high resolution and detailed three-dimensional (3D) acquisitions were captured in 2005 and 2009 respectively, along with two-dimensional (2D) images. From this information a textured 3D model was produced for most of the 300-m long central corridor. Carbon dating of the guano used for the pictographs and environmental monitoring (Temperature, Relative humidity, and Radon) completed the project. This paper presents this project, some results obtained up to now, the best practice that has emerged from this work and a description of the processing pipeline that deals with more than 27 billion 3D coordinates.
LDRD 2016 Annual Report: Laboratory Directed Research and Development Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hatton, D.
Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy (DOE) in accordance with DOE Order 413.2C dated October 22, 2015. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2016, as required. In FY 2016, the BNL LDRD Program funded 48 projects, 21 of which were new starts, at a total cost of $11.5M. The investments that BNL makes in its LDRD program support the Laboratory’smore » strategic goals. BNL has identified four Critical Outcomes that define the Laboratory’s scientific future and that will enable it to realize its overall vision. Two operational Critical Outcomes address essential operational support for that future: renewal of the BNL campus; and safe, efficient laboratory operations.« less
20 CFR 418.3230 - When will we use your subsidy inquiry as your filing date?
Code of Federal Regulations, 2012 CFR
2012-04-01
... filing date? 418.3230 Section 418.3230 Employees' Benefits SOCIAL SECURITY ADMINISTRATION MEDICARE... oral or written inquiry about the subsidy, or partially complete an Internet subsidy application on our Web site, we will use the date of the inquiry or the date the partial Internet application was started...
20 CFR 418.3230 - When will we use your subsidy inquiry as your filing date?
Code of Federal Regulations, 2014 CFR
2014-04-01
... filing date? 418.3230 Section 418.3230 Employees' Benefits SOCIAL SECURITY ADMINISTRATION MEDICARE... oral or written inquiry about the subsidy, or partially complete an Internet subsidy application on our Web site, we will use the date of the inquiry or the date the partial Internet application was started...
20 CFR 418.3230 - When will we use your subsidy inquiry as your filing date?
Code of Federal Regulations, 2013 CFR
2013-04-01
... filing date? 418.3230 Section 418.3230 Employees' Benefits SOCIAL SECURITY ADMINISTRATION MEDICARE... oral or written inquiry about the subsidy, or partially complete an Internet subsidy application on our Web site, we will use the date of the inquiry or the date the partial Internet application was started...
Evaluating the completeness of the national ALS registry, United States.
Kaye, Wendy E; Wagner, Laurie; Wu, Ruoming; Mehta, Paul
2018-02-01
Our objective was to evaluate the completeness of the United States National ALS Registry (Registry). We compared persons with ALS who were passively identified by the Registry with those actively identified in the State and Metropolitan Area ALS Surveillance project. Cases in the two projects were matched using a combination of identifiers, including, partial social security number, name, date of birth, and sex. The distributions of cases from the two projects that matched/did not match were compared and Chi-square tests conducted to determine statistical significance. There were 5883 ALS cases identified by the surveillance project. Of these, 1116 died before the Registry started, leaving 4767 cases. We matched 2720 cases from the surveillance project to those in the Registry. The cases identified by the surveillance project that did not match cases in the Registry were more likely to be non-white, Hispanic, less than 65 years of age, and from western states. The methods used by the Registry to identify ALS cases, i.e. national administrative data and self-registration, worked well but missed cases. These findings suggest that developing strategies to identify and promote the Registry to those who were more likely to be missing, e.g. non-white and Hispanic, could be beneficial to improving the completeness of the Registry.
DOT National Transportation Integrated Search
2009-08-01
The New Starts program is an important source of new capital investment in mass transportation. To be eligible for federal funding, a project must advance through the different project development phases of the New Starts program, including alternati...
Keeping Things Interesting: A Reuse Case Study
NASA Astrophysics Data System (ADS)
Troisi, V.; Swick, R.; Seufert, E.
2006-12-01
Software reuse has several obvious advantages. By taking advantage of the experience and skill of colleagues one not only saves time, money and resources, but can also jump start a project that might otherwise have floundered from the start, or not even have been possible. One of the least talked about advantages of software reuse is it helps keep the work interesting for the developers. Reuse prevents developers from spending time and energy writing software solutions to problems that have already been solved, and frees them to concentrate on solving new problems, developing new components, and doing things that have never been done before. At the National Snow and Ice Data Center we are fortunate our user community has some unique needs that aren't met by mainstream solutions. Consequently we look for reuse opportunities wherever possible so we can focus on the tasks that add value for our user community. This poster offers a case study of one thread through a decade of reuse at NSIDC that has involved eight different development efforts to date.
Escherichia coli K-12: a cooperatively developed annotation snapshot—2005
Riley, Monica; Abe, Takashi; Arnaud, Martha B.; Berlyn, Mary K.B.; Blattner, Frederick R.; Chaudhuri, Roy R.; Glasner, Jeremy D.; Horiuchi, Takashi; Keseler, Ingrid M.; Kosuge, Takehide; Mori, Hirotada; Perna, Nicole T.; Plunkett, Guy; Rudd, Kenneth E.; Serres, Margrethe H.; Thomas, Gavin H.; Thomson, Nicholas R.; Wishart, David; Wanner, Barry L.
2006-01-01
The goal of this group project has been to coordinate and bring up-to-date information on all genes of Escherichia coli K-12. Annotation of the genome of an organism entails identification of genes, the boundaries of genes in terms of precise start and end sites, and description of the gene products. Known and predicted functions were assigned to each gene product on the basis of experimental evidence or sequence analysis. Since both kinds of evidence are constantly expanding, no annotation is complete at any moment in time. This is a snapshot analysis based on the most recent genome sequences of two E.coli K-12 bacteria. An accurate and up-to-date description of E.coli K-12 genes is of particular importance to the scientific community because experimentally determined properties of its gene products provide fundamental information for annotation of innumerable genes of other organisms. Availability of the complete genome sequence of two K-12 strains allows comparison of their genotypes and mutant status of alleles. PMID:16397293
NASA Astrophysics Data System (ADS)
Timar-Gabor, Alida; Buylaert, Jan-Pieter
2017-04-01
This year marks European Research Council`s (ERC) 10th anniversary. Romania is celebrating as well 10 years as a member state of the European Union. Over the past decade Romania has made significant progress in supporting research development at the national level. However, when it comes to excellent frontier research as supported by the ERC, Romania`s involvement and visibility at a European level remains very low. Considering only young researchers, according to ERC statistics only 142 proposals hosted by institutions in Romania have been submitted in the Starting and Consolidator Grant schemes in the last 3 years (2014-2016). For corresponding funding schemes at a national level Romania`s Executive Agency for Financing Research, Development and Innovation (UEFISCDI) received over 2000 applications only in 2016. The success rate of ERC proposals hosted by Romania is even more concerning (less than 3%) with only 4 projects out of 142 being granted. In 2015, Dr Alida Timar-Gabor was awarded an ERC starting grant (grant agreement No [678106]; INTERTRAP) which is the first ERC project to be implemented in a Romanian university. In the INTERTRAP project Dr Timar-Gabor and her team aims to achieve significant improvement in quartz based luminescence dating and to develop new absolute dating techniques for Quaternary sediments. During the implementation of the project a new state-of-the-art luminescence and electron spin resonance laboratory, unique in Eastern Europe and one of the only two or three in the world, will be set up. Dr. Alida Timar-Gabor, PI of INTERTRAP, is the founder and leader of the only absolute dating laboratory in Romania that was founded in 2008. She has defended her PhD in 2010 and supervised and co-supervised 10 other PhD students since then. She holds various national and international awards. Her career path has been significantly influenced by a strong network of international collaborations. In this presentation she will give an overview of her research career with emphasis on: (i) importance of international collaborations, (ii) establishment of herself in a research field using results obtained in a not yet fully established laboratory, (iii) the hardships but also the rewards of being in charge of a research laboratory from a very young age and (iv) the difficulties encountered in the implementation of an ERC research grant in a Romanian university. Romania`s readiness to absorb ERC grants will be discussed in the framework of a case study. The level of support in preparing the grant application as well as the implementation of INTERTRAP at Babeş-Bolyai University of Cluj-Napoca Romania will be compared to the RELOS grant (Reducing empiricism in luminescence geochronology: Understanding the origins of luminescence from individual sand grains, ERC-2014-STG, grant agreement No [639904]), a grant in the same research field lead by Dr. Jan-Pieter Buylaert and hosted by the Technical University of Denmark.
20 CFR 418.3230 - When will we use your subsidy inquiry as your filing date?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false When will we use your subsidy inquiry as your filing date? 418.3230 Section 418.3230 Employees' Benefits SOCIAL SECURITY ADMINISTRATION MEDICARE... Web site, we will use the date of the inquiry or the date the partial Internet application was started...
20 CFR 418.3230 - When will we use your subsidy inquiry as your filing date?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false When will we use your subsidy inquiry as your filing date? 418.3230 Section 418.3230 Employees' Benefits SOCIAL SECURITY ADMINISTRATION MEDICARE... Web site, we will use the date of the inquiry or the date the partial Internet application was started...
Training of Ability for Engineering Design through Long Term Internship Program
NASA Astrophysics Data System (ADS)
Konishi, Masami; Gofuku, Akio; Tomita, Eiji
The education program for engineering design capabilities through long term internship of Okayama University had started in 2006. The program supported by the MEXT is aimed to educate students in the Graduate School of Natural Science and Technology of Okayama University. The internship satellite laboratory of the University is settled in the near place of collaborative companies in which students are engaged with the project themes extracted from problems in the factory of collaborative companies. Through the program, promotion of abilities for setup and solving a problem considering cost and due date together with performance of the solution. Students are also expected to gain knowledge on patent and ethics required for skillful engineers.
NASA Astrophysics Data System (ADS)
Shostak, Seth
The Drake equation, a commonly-used starting point for discussions about the likelihood of finding extraterrestrial intelligence, is now nearly a halfcentury old. It dates from 1961, a year after Frank Drake made his pioneering radio search for artificial signals from other worlds. That search, dubbed Project Ozma, was a 200-hour scrutiny of two nearby, Sun-like stars for transmissions spectrally situated near the 1420 MHz line of neutral hydrogen, and was conducted with an 85-foot antenna at the National Radio Astronomy Observatory in Green Bank, West Virginia (Drake, 1960; Kellermann and Seielstad, 1986). These efforts to find easy evidence of intelligence in other star systems provoked considerable public interest, including a major article in Saturday Review (Lear, 1960).
NASA Astrophysics Data System (ADS)
Shahriari, Mohammadreza
2016-06-01
The time-cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate extra resources to short the finishing time of project and the project managers are intended to spend the lowest possible amount of money and achieve the maximum crashing time, as a result, both direct and indirect costs will be influenced in the project, and here, we are facing into the time value of money. It means that when we crash the starting activities in a project, the extra investment will be tied in until the end date of the project; however, when we crash the final activities, the extra investment will be tied in for a much shorter period. This study is presenting a two-objective mathematical model for balancing compressing the project time with activities delay to prepare a suitable tool for decision makers caught in available facilities and due to the time of projects. Also drawing the scheduling problem to real world conditions by considering nonlinear objective function and the time value of money are considered. The presented problem was solved using NSGA-II, and the effect of time compressing reports on the non-dominant set.
ERIC Educational Resources Information Center
McKey, Ruth Hubbell; And Others
Including all Head Start research (both published and unpublished) and using, when possible, the statistical technique of meta-analysis, this final report of the Head Start Evaluation, Synthesis, and Utilization Project presents findings on the impact of Head Start on children's cognitive and socioemotional development, on child health and health…
2014-02-01
Operational Model Archive and Distribution System ( NOMADS ). The RTMA product was generated using a 2-D variational method to assimilate point weather...observations and satellite-derived measurements (National Weather Service, 2013). The products were downloaded using the NOMADS General Regularly...of the completed WRF run" read Start_Date echo $Start_Date echo " " echo "Enter 2- digit , zulu, observation hour (HH) for remapping" read oHH
Reed, Bradley C.; Budde, Michael E.; Spencer, Page; Miller, Amy E.
2009-01-01
Impacts of global climate change are expected to result in greater variation in the seasonality of snowpack, lake ice, and vegetation dynamics in southwest Alaska. All have wide-reaching physical and biological ecosystem effects in the region. We used Moderate Resolution Imaging Spectroradiometer (MODIS) calibrated radiance, snow cover extent, and vegetation index products for interpreting interannual variation in the duration and extent of snowpack, lake ice, and vegetation dynamics for southwest Alaska. The approach integrates multiple seasonal metrics across large ecological regions. Throughout the observation period (2001-2007), snow cover duration was stable within ecoregions, with variable start and end dates. The start of the lake ice season lagged the snow season by 2 to 3??months. Within a given lake, freeze-up dates varied in timing and duration, while break-up dates were more consistent. Vegetation phenology varied less than snow and ice metrics, with start-of-season dates comparatively consistent across years. The start of growing season and snow melt were related to one another as they are both temperature dependent. Higher than average temperatures during the El Ni??o winter of 2002-2003 were expressed in anomalous ice and snow season patterns. We are developing a consistent, MODIS-based dataset that will be used to monitor temporal trends of each of these seasonal metrics and to map areas of change for the study area.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Allen, A.B.; Malavassi, L.; Ramirez, O.
1989-05-01
As a part of the Agency for International Development-funded cooperative project between Los Alamos and Costa Rica, the burning characteristics of Costa Rican peat were to be tested in an application. The cement plant owned by Industria National de Cemento in Cartago has a capability to handle solid fuel and was chosen for the burn demonstration. The Jungle No. 1 Peat Deposit near El Cairo was chosen as the site of the peat excavation. This peat production methodology study covers project site selection, installation of an access road and clearing of the jungle vegetation, removal of an upper layer ofmore » organic peat, excavation of fuel-grade peat, transport of the peat to the drying site, and drying and stockpiling of the finished product. As of this date the peat removal for the demonstration project has been started, and a description of the operation is included as an appendix to this paper. 10 figs.« less
Head Start Goes to School: 1992-93 Evaluation Report.
ERIC Educational Resources Information Center
Greene, Andrea; And Others
This document describes first-year outcomes of the Arizona Transition Project, which is part of the National Head Start-Public School Transition Project. The project seeks to maintain the early benefits of Head Start through the primary grades and beyond. Outcomes for 1992-93 relating to children, families, system, and policy for the years K-3…
... like hitting, shoving, kicking, biting, or throwing things Emotional abuse like yelling, name-calling, bullying, embarrassing, keeping you ... are very drunk). Dating violence often starts with emotional abuse. You may think that behaviors like calling you ...
Cooperative observation data center for planets: starting with the Mars 2009-2010 observation
NASA Astrophysics Data System (ADS)
Nakakushi, T.; Okyudo, M.; Tomita, A.
2009-12-01
We propose in this paper a plan to construct a planetary image data center on the internet, which links professional researchers and amateur observers all over the world. Such data archive projects have worked, at least for Mars. Since 2003, one of the authors (T. N.) have started a project to summarize Mars observations using such cooperative network observation data archives and to publish the summary as professional research papers (Nakakushi et al., 2004, 2005, and 2008). Planetary atmosphere varies in various timescales, which requires temporarily continuous observations. Cooperative observation which amateur observers join can keep the observation continuous and sustainable, so that it can be a strong weapon to reveal planetary climate and meteorology. For outer planets, in particular, we don't know synoptic "seasonal" variations because of their long periods of revolution. We need steady and persistent effort to accumulate observations. That is why we need amateur observers' high-level observation techniques. To do so, we also needs systems to provide (and reproduce) data for users in an appropriate manner. We start from Mars with our own new date archive website, because we have much experience in terms of Mars. Next, we will expand the system for all the planets. Roughly said, there will be 3 steps to expand the project to all the planets: (1) to construct our own Mars cooperative observation data center, (2) to link it with professional studies, (3) to construct cooperative observation data center for all planets. And 4 problems to tackle: (1) to develop web interfaces for users to submit data, (2) to develop interfaces for managers, (3) to secure finances, (4) to secure professional researchers. 2009 and 2010 are a good apparition for Mars observation. We manage the Mars image data website, find problems and solutions in detail, and search for ways to expand it to all the planet and to enable sustainable management.
Special Analysis of Migrant Education Even Start Data. Even Start Information System.
ERIC Educational Resources Information Center
Tao, Fumiyo; Arriola, Christine
This report analyzes data submitted by 11 of 14 state Migrant Education Even Start (MEES) projects operating in 1994-95. These projects provide migrant families with an integrated program of early childhood education, adult education, and parenting education. The data were drawn from the Even Start Information System (ESIS), which collected…
ERIC Educational Resources Information Center
Greene, Andrea; And Others
In 1991 the Department of Health and Human Services funded 32 sites throughout the United States to develop and implement Head Start-Public School Early Childhood Transition Demonstration Projects. The purpose of 31 projects, which are in their fourth year of operation, is to stimulate partnerships among Head Start agencies, public schools, and…
Miller, Shari; Williams, Jason; Cutbush, Stacey; Gibbs, Deborah; Clinton-Sherrod, Monique; Jones, Sarah
2015-02-01
This study reports on an independent evaluation of Start Strong: Building Healthy Teen Relationships, a multicomponent initiative targeting 11- to 14-year-olds. "Start Strong" was designed to focus on the developmental needs of middle school students and to enhance skills and attitudes consistent with promotion of healthy relationships and reduction of teen dating violence (TDV). The quasi-experimental evaluation design included data collection from four Start Strong schools and four comparison schools. Student surveys were collected at four waves of data at the beginning and the end of grades 7 and 8. Multilevel models used repeated observations nested within students who were, in turn, nested within schools to determine whether participation in Start Strong enhanced healthy skills and relationships and decreased TDV-related attitudes and behaviors. Short-term effects from waves 1 to 2 were statistically significant for increased parent-child communication and boy/girlfriend relationship satisfaction and support and decreased gender stereotypes and attitudes supporting TDV. Findings for acceptance of TDV and gender stereotypes persisted longitudinally. Results are promising and illustrate that a multicomponent, community-based initiative reduced risk factors predictive of TDV. Start Strong is innovative in its focus on early adolescence, which is a critical period in the transition to dating. The results inform future intervention efforts and underscore the need for further study of middle school students. Copyright © 2015 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.
An historical account of the first year of operation of the Maine School of Science and Mathematics
NASA Astrophysics Data System (ADS)
Patterson, James Charles
The purpose of this study was to describe the first school year of operation for the Maine School of Science and Mathematics. Specific areas included in the study were: student residential life and support services, curriculum design, faculty characteristics, administrative structure and guidelines and a formative evaluation design. A comparison was made to a synthesis of characteristics derived from the literature review on the ten public, statewide, residential schools who are members of the National Consortium for Specialized Secondary Schools of Mathematics, Science and Technology. The Maine School of Science and Mathematics is a statewide public, residential, charter high school designed for highly motivated and high achieving students from across the state. The enabling legislation that created the school was passed in 1994 with a projected start-up in the Fall of 1995. A new independent governor took office in January, 1995 and announced that the appropriation to educate the first students would be delayed until a later date due to an ongoing economic recession. A staff of three full-time MSSM employees worked with the Maine Legislature and a initial start-up appropriation was finally enacted on June 30, 1995 just sixty days from the projected opening date of this new, public, school of choice. During July and August 1995, a teaching faculty, residential life supervisors and a support staff had to be hired and trained. Major policy and program decisions had to be made regarding curriculum, students life/discipline, program evaluation, student transportation, recreation programs, textbook selection, equipment and supply purchases. Students selected to be in the entering class had to make their final decisions to attend this unknown and controversial new charter high school. Finally, as the Maine School of Science and Mathematics was to share the former Limestone High School with the Limestone School Department, space and cost allocations had to be negotiated.
NASA Astrophysics Data System (ADS)
Garcia-Mozo, H.; Orlandi, F.; Galan, C.; Fornaciari, M.; Romano, B.; Ruiz, L.; Diaz de La Guardia, C.; Trigo, M. M.; Chuine, I.
2009-03-01
Phenology data are sensitive data to identify how plants are adapted to local climate and how they respond to climatic changes. Modeling flowering phenology allows us to identify the meteorological variables determining the reproductive cycle. Phenology of temperate of woody plants is assumed to be locally adapted to climate. Nevertheless, recent research shows that local adaptation may not be an important constraint in predicting phenological responses. We analyzed variations in flowering dates of Olea europaea L. at different sites of Spain and Italy, testing for a genetic differentiation of flowering phenology among olive varieties to estimate whether local modeling is necessary for olive or not. We build models for the onset and peak dates flowering in different sites of Andalusia and Puglia. Process-based phenological models using temperature as input variable and photoperiod as the threshold date to start temperature accumulation were developed to predict both dates. Our results confirm and update previous results that indicated an advance in olive onset dates. The results indicate that both internal and external validity were higher in the models that used the photoperiod as an indicator to start to cumulate temperature. The use of the unified model for modeling the start and peak dates in the different localities provides standardized results for the comparative study. The use of regional models grouping localities by varieties and climate similarities indicate that local adaptation would not be an important factor in predicting olive phenological responses face to the global temperature increase.
Southern African Large Telescope (SALT) project: progress and status after 2 years
NASA Astrophysics Data System (ADS)
Meiring, Jacobus G.; Buckley, David A. H.; Lomberg, Michael C.; Stobie, Robert S.
2003-02-01
The Southern African Large Telescope (SALT) is a 10-m class optical/IR segmented mirror telescope based on the groundbreaking, low cost, Hobby-Eberly Telescope (HET) design. Approval to construct and operate SALT, which will be the largest single optical telescope in the Southern Hemisphere, was given by the South African Government in November 1999, after sufficient guarantees of matching funding from international partners were secured. Facility construction started in January 2001, and SALT is due to start operations by December 2004. SALT will enable a quantum leap in astronomical research capability in Southern Africa, and indeed the continent, where currently the largest telescope is a modest 1.9-m, dating to the 1940s. A substantial amount of design work for SALT has been completed, sourced from multiple suppliers, with ~60% South African content. South African industry is well equipped to handle the construction of most of the telescope, the exceptions being the glass ceramic mirror blanks (from LZOS in Russia), the polishing and ion figuring of these (Eastman Kodak in the USA), and fabrication of the four-element spherical aberration corrector (SAGEM in France). This paper will present (1) the scientific requirements, (2) the specified performance of SALT, (3) the basic design, with emphasis on the innovative modifications to the HET design that enable significantly improved performance, (4) the progress and status of the project, currently in its construction phase, (5) the first generation instrument suite, (6) the management and organisation of the project and (7) the international partnership in SALT.
NASA Technical Reports Server (NTRS)
Cheffin, R. E.; Woolley, S. K. (Principal Investigator)
1979-01-01
The author has identified the following significant results. The estimates of developmental stage dates from the LACIE adjustable crop calendar (ACC) winter wheat model was somewhat more accurate than the historical crop calendar after jointing. The ACC winter wheat model was not so accurate for the Texas Panhandle as it was for the other areas of the USPG-7 because dry soil conditions delayed fall planting in the Panhandle. Since the LACIE ACC winter wheat model does not contain a moisture term and it was started with historical planting dates, lengthy delays in planting mean that the ACC model will probably be started early and will estimate the developmental growth stages to occur too early in the season. The LACIE ACC spring wheat model was also started early in most areas because of late planting due to fields wet from melting snow and rain. The starter model used to estimate spring planting dates was not accurate under these wet soil conditions and tended to predict the developmental stages to occur earlier than the dates observed in the fields.
Analysis of the Impacts of an Early Start for Compliance with the Kyoto Protocol
1999-01-01
This report describes the Energy Information Administration's analysis of the impacts of an early start, using the same methodology as in Impacts of the Kyoto Protocol on U.S. Energy Markets and Economic Activity, with only those changes in assumptions caused by the early start date.
THE DEVELOPMENT OF SELF-OTHER RELATIONSHIPS DURING PROJECT HEAD START.
ERIC Educational Resources Information Center
LAMB, HOWARD E.; AND OTHERS
PROJECT HEAD START WAS CONCEIVED IN PART, TO INCREASE THE ORDINARILY REDUCED NUMBER OF CONNECTIONS BETWEEN THE CHILD AND OTHER PEOPLE. FOUR QUESTIONS WERE ASKED. (1) WOULD THE DEVELOPMENT OF SELF-SOCIAL CONSTRUCTS OF HEAD START CHILDREN DIFFER FROM THE DEVELOPMENT OF CHILDREN IN A CONTROL GROUP. (2) WOULD HEAD START CHILDREN DEVELOP APPROPRIATE…
1201200612z star date and time; when the modified observed precipitation starts (inclusive) 1202200612z end date and time; when the modified observed precipitation ends (non-inclusive) 1205200612z valid date and time; when the mod expires 2.0 the muliplier used to adjust the observed precip (i.e. values less than
33 CFR 156.150 - Declaration of inspection.
Code of Federal Regulations, 2014 CFR
2014-07-01
... operation if not at a facility; (3) The date and time the transfer operation is started; (4) A list of the... transfer operations on the transferring vessel or facility and a space for the date, time of signing... transferring product; and (6) The date and time the transfer operation is completed. (d) The form for the...
33 CFR 156.150 - Declaration of inspection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... operation if not at a facility; (3) The date and time the transfer operation is started; (4) A list of the... transfer operations on the transferring vessel or facility and a space for the date, time of signing... transferring product; and (6) The date and time the transfer operation is completed. (d) The form for the...
33 CFR 156.150 - Declaration of inspection.
Code of Federal Regulations, 2012 CFR
2012-07-01
... operation if not at a facility; (3) The date and time the transfer operation is started; (4) A list of the... transfer operations on the transferring vessel or facility and a space for the date, time of signing... transferring product; and (6) The date and time the transfer operation is completed. (d) The form for the...
33 CFR 156.150 - Declaration of inspection.
Code of Federal Regulations, 2011 CFR
2011-07-01
... operation if not at a facility; (3) The date and time the transfer operation is started; (4) A list of the... transfer operations on the transferring vessel or facility and a space for the date, time of signing... transferring product; and (6) The date and time the transfer operation is completed. (d) The form for the...
33 CFR 156.150 - Declaration of inspection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... operation if not at a facility; (3) The date and time the transfer operation is started; (4) A list of the... transfer operations on the transferring vessel or facility and a space for the date, time of signing... transferring product; and (6) The date and time the transfer operation is completed. (d) The form for the...
7 CFR 1421.106 - Warehouse-stored marketing assistance loan collateral.
Code of Federal Regulations, 2011 CFR
2011-01-01
... indicating that: (1) Storage charges through the maturity date have been prepaid; or (2) The producer has... commodity stored in an approved warehouse shall be the later of the following: (1) The date the commodity was received or deposited in the warehouse; (2) The date the storage charges start; or (3) The day...
Surface meteorology and Solar Energy
NASA Technical Reports Server (NTRS)
Stackhouse, Paul W. (Principal Investigator)
The Release 5.1 Surface meteorology and Solar Energy (SSE) data contains parameters formulated for assessing and designing renewable energy systems. Parameters fall under 11 categories including: Solar cooking, solar thermal applications, solar geometry, tilted solar panels, energy storage systems, surplus product storage systems, cloud information, temperature, wind, other meteorological factors, and supporting information. This latest release contains new parameters based on recommendations by the renewable energy industry and it is more accurate than previous releases. On-line plotting capabilities allow quick evaluation of potential renewable energy projects for any region of the world. The SSE data set is formulated from NASA satellite- and reanalysis-derived insolation and meteorological data for the 10-year period July 1983 through June 1993. Results are provided for 1 degree latitude by 1 degree longitude grid cells over the globe. Average daily and monthly measurements for 1195 World Radiation Data Centre ground sites are also available. [Mission Objectives] The SSE project contains insolation and meteorology data intended to aid in the development of renewable energy systems. Collaboration between SSE and technology industries such as the Hybrid Optimization Model for Electric Renewables ( HOMER ) may aid in designing electric power systems that employ some combination of wind turbines, photovoltaic panels, or diesel generators to produce electricity. [Temporal_Coverage: Start_Date=1983-07-01; Stop_Date=1993-06-30] [Spatial_Coverage: Southernmost_Latitude=-90; Northernmost_Latitude=90; Westernmost_Longitude=-180; Easternmost_Longitude=180].
Ramagopalan, Sreeram; Skingsley, Andrew P; Handunnetthi, Lahiru; Klingel, Michelle; Magnus, Daniel; Pakpoor, Julia; Goldacre, Ben
2014-01-01
An important principle in the good conduct of clinical trials is that a summary of the trial protocol, with a pre-defined primary outcome, should be freely available before the study commences. The clinical trials registry ClinicalTrials.gov provides one method of doing this, and once the trial is registered, any changes made to the primary outcome are documented. The objectives of this study were: to assess the proportion of registered trials on ClinicalTrials.gov that had the primary outcome changed; to assess when the primary outcome was changed in relation to the listed study start and end dates and to assess whether the primary outcome change had any relation to the study sponsor. A cross-sectional analysis of all interventional clinical trials registered on ClinicalTrials.gov as of 25 October 2012 was performed. The main outcome was any change made to the initially listed primary outcome and the time of the change in relation to the trial start and end date. Our analysis showed that 28229 of 89204 (31.7%) registered studies had their primary outcome changed. Industry funding was associated with all primary outcome changes, odds ratio (OR)= 1.36, 95% confidence interval (CI)=1.31-1.41, p<0.001; with primary outcome changes after study start date OR=1.37, 95% CI=1.32-1.42, p<0.001; with primary outcome changes after primary completion date OR=1.84, 95% CI=1.75-1.94, p<0.001 and with primary outcome changes after study completion date OR=1.82, 95% CI=1.73-1.91, p<0.001. Conclusions A significant proportion of interventional trials registered on ClinicalTrials.gov have their primary outcomes altered after the listed study start and completion dates. These changes are associated with funding source.
Concentrating Solar Power Projects - Termesol 50 | Concentrating Solar
. Status Date: March 20, 2017 Project Overview Project Name: Termesol 50 (Valle 2) Country: Spain Location &M Jobs: 45 PPA/Tariff Date: January 1, 2010 Participants Developer(s): Torresol Owner(s
Help-Seeking and Help-Giving for Teen Dating Violence
ERIC Educational Resources Information Center
Weisz, Arlene N.; Black, Beverly M.
2009-01-01
This article is based on numerous research projects conducted by the authors on adolescent dating violence. It reviews the results of those projects as they relate to how teens seek help for dating violence and how teens provide help to their friends in violent dating relationships. It concludes with helpful strategies for adults who work with…
XOPPS - OEL PROJECT PLANNER/SCHEDULER TOOL
NASA Technical Reports Server (NTRS)
Mulnix, C. L.
1994-01-01
XOPPS is a window-based graphics tool for scheduling and project planning that provides easy and fast on-screen WYSIWYG editing capabilities. It has a canvas area which displays the full image of the schedule being edited. The canvas contains a header area for text and a schedule area for plotting graphic representations of milestone objects in a flexible timeline. XOPPS is object-oriented, but it is unique in its capability for creating objects that have date attributes. Each object on the screen can be treated as a unit for moving, editing, etc. There is a mouse interface for simple control of pointer location. The user can position objects to pixel resolution, but objects with an associated date are positioned automatically in their correct timeline position in the schedule area. The schedule area has horizontal lines across the page with capabilities for multiple pages and for editing the number of lines per page and the line grid. The text on a line can be edited and a line can be moved with all objects on the line moving with it. The timeline display can be edited to plot any time period in a variety of formats from Fiscal year to Calendar Year and days to years. Text objects and image objects (rasterfiles and icons) can be created for placement anywhere on the page. Milestone event objects with a single associated date (and optional text and milestone symbol) and activity objects with start and end dates (and an optional completion date) have unique editing panels for entering data. A representation for schedule slips is also provided with the capability to automatically convert a milestone event to a slip. A milestone schedule on another computer can be saved to an ASCII file to be read by XOPPS. The program can print a schedule to a PostScript file. Dependencies between objects can also be displayed on the chart through the use of precedence lines. This program is not intended to replace a commercial scheduling/project management program. Because XOPPS has an ASCII file interface it can be used in conjunction with a project management tool to produce schedules with a quality appearance. XOPPS is written in C-language for Sun series workstations running SunOS. This package requires MIT's X Window System, Version 11 Revision 4, with OSF/Motif 1.1. A sample executable is included. XOPPS requires 375K main memory and 1.5Mb free disk space for execution. The standard distribution medium is a .25 inch streaming magnetic tape cartridge in UNIX tar format. XOPPS was developed in 1992, based on the Sunview version of OPPS (NPO-18439) developed in 1990. It is a copyrighted work with all copyright vested in NASA.
Eleven Tribes Jump START Clean Energy Projects, Summer 2012 (Newsletter)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This newsletter describes key activities of the DOE Office of Indian Energy Policy and Programs for Summer 2012. The U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) has selected 11 Tribes - five in Alaska and six in the contiguous United States - to receive on-the-ground technical support for community-based energy efficiency and renewable energy projects as part of DOE-IE's Strategic Technical Assistance Response Team (START) Program. START finalists were selected based on the clarity of their requests for technical assistance and the ability of START to successfully work with their projects or community. Technical expertsmore » from DOE and its National Renewable Energy Laboratory (NREL) will work directly with community-based project teams to analyze local energy issues and assist the Tribes in moving their projects forward. In Alaska, the effort will be bolstered by DOE-IE's partnership with the Denali Commission, which will provide additional assistance and expertise, as well as funding to fuel the Alaska START initiative.« less
77 FR 49782 - Mid-Atlantic Fishery Management Council (MAFMC); Public Hearings
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-17
... hour after the hearing start time, the hearing may be closed. Some GPS navigation units may provide... prior to the hearing date. Dated: August 14, 2012. Tracey L. Thompson, Acting Deputy Director, Office of...
Concentrating Solar Power Projects - City of Medicine Hat ISCC Project |
trough Turbine Capacity: Net: 1.1 MW Gross: 1.1 MW Status: Operational Start Year: 2014 Do you have more Start Production: November 2014 Cost (approx): 9 $ million Project Type: ISCC Demonstration Participants
NASA Technical Reports Server (NTRS)
Saunders, R. S.; Spear, A. J.; Allin, P. C.; Austin, R. S.; Berman, A. L.; Chandlee, R. C.; Clark, J.; Decharon, A. V.; De Jong, E. M.; Griffith, D. G.
1992-01-01
Magellan started mapping the planet Venus on September 15, 1990, and after one cycle (one Venus day or 243 earth days) had mapped 84 percent of the planet's surface. This returned an image data volume greater than all past planetary missions combined. Spacecraft problems were experienced in flight. Changes in operational procedures and reprogramming of onboard computers minimized the amount of mapping data lost. Magellan data processing is the largest planetary image-processing challenge to date. Compilation of global maps of tectonic and volcanic features, as well as impact craters and related phenomena and surface processes related to wind, weathering, and mass wasting, has begun. The Magellan project is now in an extended mission phase, with plans for additional cycles out to 1995. The Magellan project will fill in mapping gaps, obtain a global gravity data set between mid-September 1992 and May 1993, acquire images at different view angles, and look for changes on the surface from one cycle to another caused by surface activity such as volcanism, faulting, or wind activity.
NASA Technical Reports Server (NTRS)
1993-01-01
Satellite systems to date have been mainly scientific in nature. Only a few systems have been of direct use to the public such as for telephone or television transmission. Space enterprises have remained a mystery to the general public and beyond the reach of the small business community. The result is a less than supportive public when it comes to space activities. The purpose of the ISAT-1 program is to develop a small and relatively inexpensive satellite that will serve the State of Iowa, primarily for educational purposes. It will provide products, services, and activities that will be educational, practical, and useful for a large number for people. The emphasis is on public awareness, 'space literacy', and routine practical applications rather than high technology. The initial conceptual design phase was complete when the current team took over the project. Some areas of the conceptual design were taken a little farther, but for the most part this team started at the detailed design stage.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yamada, K.; Aksan, S. N.
The Supercritical Water-Cooled Reactor (SCWR) is an innovative water-cooled reactor concept, which uses supercritical pressure water as reactor coolant. It has been attracting interest of many researchers in various countries mainly due to its benefits of high thermal efficiency and simple primary systems, resulting in low capital cost. The IAEA started in 2008 a Coordinated Research Project (CRP) on Thermal-Hydraulics of SCWRs as a forum to foster the exchange of technical information and international collaboration in research and development. This paper summarizes the activities and current status of the CRP, as well as major progress achieved to date. At present,more » 15 institutions closely collaborate in several tasks. Some organizations have been conducting thermal-hydraulics experiments and analysing the data, and others have been participating in code-to-test and/or code-to-code benchmark exercises. The expected outputs of the CRP are also discussed. Finally, the paper introduces several IAEA activities relating to or arising from the CRP. (authors)« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-16
... Housing Starts, Sales, and Completions AGENCY: U.S. Census Bureau, Commerce. ACTION: Notice. SUMMARY: The... and Budget (OMB) clearance of the Survey of Housing Starts, Sales and Completions, also known as the... system, etc.), and if applicable, date of sale, sales price, and type of financing. The SOC provides...
Chooz A, First Pressurized Water Reactor to be Dismantled in France - 13445
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boucau, Joseph; Mirabella, C.; Nilsson, Lennart
2013-07-01
Nine commercial nuclear power plants have been permanently shut down in France to date, of which the Chooz A plant underwent an extensive decommissioning and dismantling program. Chooz Nuclear Power Station is located in the municipality of Chooz, Ardennes region, in the northeast part of France. Chooz B1 and B2 are 1,500 megawatt electric (MWe) pressurized water reactors (PWRs) currently in operation. Chooz A, a 305 MWe PWR implanted in two caves within a hill, began operations in 1967 and closed in 1991, and will now become the first PWR in France to be fully dismantled. EDF CIDEN (Engineering Centermore » for Dismantling and Environment) has awarded Westinghouse a contract for the dismantling of its Chooz A reactor vessel (RV). The project began in January 2010. Westinghouse is leading the project in a consortium with Nuvia France. The project scope includes overall project management, conditioning of the reactor vessel (RV) head, RV and RV internals segmentation, reactor nozzle cutting for lifting the RV out of the pit and seal it afterwards, dismantling of the RV thermal insulation, ALARA (As Low As Reasonably Achievable) forecast to ensure acceptable doses for the personnel, complementary vacuum cleaner to catch the chips during the segmentation work, needs and facilities, waste characterization and packaging, civil work modifications, licensing documentation. The RV and RV internals will be segmented based on the mechanical cutting technology that Westinghouse applied successfully for more than 13 years. The segmentation activities cover the cutting and packaging plan, tooling design and qualification, personnel training and site implementation. Since Chooz A is located inside two caves, the project will involve waste transportation from the reactor cave through long galleries to the waste buffer area. The project will end after the entire dismantling work is completed, and the waste storage is outside the caves and ready to be shipped either to the ANDRA (French National Radioactive Waste Management Agency) waste disposal facilities - (for low-level waste [LLW] and very low-level waste [VLLW], which are considered short lived) - or to the EDF Interim Storage Facility planned to be built on another site - (for low- and intermediate-level waste [LILW], which is considered long lived). The project has started with a detailed conceptual study that determines the step-by-step approach for dismantling the reactor and eventually supplying the packed containers ready for final disposal. All technical reports must be verified and approved by EDF and the French Nuclear Safety Authority before receiving the authorization to start the site work. The detailed conceptual study has been completed to date and equipment design and manufacturing is ongoing. This paper will present the conceptual design of the reactor internals segmentation and packaging process that will be implemented at Chooz A, including the planning, methodology, equipment, waste management, and packaging strategy. (authors)« less
Concentrating Solar Power Projects - Arcosol 50 | Concentrating Solar Power
Date: March 20, 2017 Project Overview Project Name: Arcosol 50 (Valle 1) Country: Spain Location: San Annual O&M Jobs: 45 PPA/Tariff Date: January 1, 2010 Participants Developer(s): Torresol Owner(s
DOT National Transportation Integrated Search
1998-11-01
FTA assessed and rated the Transit Supportive Existing Land Use and Future Patterns of 30 candidate New Starts projects, in preliminary engineering and final design, documented in the FY 1999 New Starts Report. These land use assessments (30) examine...
Development and implementation of an HSE management system in E and P companies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bentley, P.D.; Mundhenk, D.L.; Jones, M.G.
1995-01-01
This paper describes the experience to date with safety management systems (SMS's) and describes their implementation after the Piper Alpha disaster and Lord Cullen's report. It also shows the gradual expansion of these systems toward fully integrated health, safety, and environment (HSE) management systems. The authors' company policy, which was clearly stated before publication of Lord Cullen's report, is that work should not start until the appropriate controls are in place. Work based on this policy and on objective-setting SMS's within Shell Intl. Petroleum Mij. (SIPM) E and P coordination started in earnest soon after the publication of the reportmore » in Nov. 1990 and has continued without interruption since that time. Objective-setting systems may be defined as systems where the company management sets its own objectives or goals on the basis of functional rather than prescriptive requirements and then goes on to demonstrate how such goals have been, or are being, met. The paper ends with a projection of what may be expected in the future.« less
Molecular Innovations Toward Theranostics of Aggressive Prostate Cancer
2015-09-01
Xiankai Sun, PhD CONTRACTING ORGANIZATION: University of Texas Southwestern Medical Center, Dallas, TX 75390 REPORT DATE : September 2015 TYPE OF REPORT...number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE (DD-MM-YYYY) September 2015 2. REPORT TYPE Annual 3. DATES COVERED (From...toxicity. To date , we have developed the radiochemistry procedure to label the T-SMDC with 68Ga efficiently. We have started evaluating its therapeutic
Let Children Start School When They're Ready!
ERIC Educational Resources Information Center
Parsons, Cynthia
1985-01-01
Any given child should attend school full time when three parties agree that the time is right: the child, his or her parents, and the school officials. Arbitrary starting dates based on calendar age are outmoded and educationally unsound. (PGD)
ERIC Educational Resources Information Center
STEWART, E. ELIZABETH; WILLIAMS, RICHARD H.
THIS DOCUMENT IS SECTION 1 OF A 3-PART REPORT BY THE EDUCATIONAL TESTING SERVICE. THIS SECTION DESCRIBES, IN EXTENSIVE STATISTICAL TERMS, A SAMPLE OF 445 HEAD START CHILDREN IN TERMS OF THEIR SCORES ON (1) THE STANFORD-BINET L-M, (2) THE CALDWELL PRESCHOOL INVENTORY, AND (3) THE PROJECT HEAD START BEHAVIOR INVENTORY. THE SAMPLING PROCEDURES USED…
24 CFR 220.840 - Issue date of debentures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Issue date of debentures. 220.840 Section 220.840 Housing and Urban Development Regulations Relating to Housing and Urban Development... Contract Rights and Obligations-Projects Insured Project Improvement Loans § 220.840 Issue date of...
Parallelization of Rocket Engine Simulator Software (P.R.E.S.S.)
NASA Technical Reports Server (NTRS)
Cezzar, Ruknet
1999-01-01
Parallelization of Rocket Engine System Software (PRESS) project is part of a collaborative effort with Southern University at Baton Rouge (SUBR), University of West Florida (UWF), and Jackson State University (JSU). The project has started on October 19, 1995, and after a three-year period corresponding to project phases and fiscal-year funding by NASA Lewis Research Center (now Glenn Research Center), has ended on October 18, 1998. The one-year no-cost extension period was granted on June 7, 1998, until October 19, 1999. The aim of this one year no-cost extension period was to carry out further research to complete the work and lay the groundwork for subsequent research in the area of aerospace engine design optimization software tools. The previous progress for the research has been reported in great detail in respective interim and final research progress reports, seven of them, in all. While the purpose of this report is to be a final summary and an valuative view of the entire work since the first year funding, the following is a quick recap of the most important sections of the interim report dated April 30, 1999.
Projecting housing starts and softwood lumber consumption in the United States
Jeffrey P. Prestemon; David N. Wear; Karen L. Abt; Robert C. Abt
2018-01-01
New residential construction is a primary user of wood products in the United States; therefore, wood products projections require understanding the determinants of housing starts. We model quarterly US total, single-family, and multifamily housing starts with several model specifications, using data from 1979 to 2008, and evaluate their...
NASA Astrophysics Data System (ADS)
de Ridder, Tim; Kluiving, Sjoerd; van Dasselaar, Marcel
2013-04-01
In Medieval times the city of Vlaardingen (the Netherlands) was strategically located on the confluence of three rivers, the Meuse, the Merwede and the Vlaarding. A church of early 8th century was already located here. In a short period of time Vlaardingen developed into an international trading place, the most important place in the former county of Holland. Starting from the 11th century the river Meuse threatened to flood the settlement, and as a reaction to it inhabitants started to raise the surface. This resulted eventually in an enormous mound, surface: 200 by 250 meter, built up in a four to five meter thick sequence of clay and manure in which organic rests of former occupation are extremely well preserved, e.g. wooden posts, mesh walls, but also leather objects. Early 2002 graves were found in the city centre, dating 1000-1050, in which not only the wooden coffins, but also the straw that covered the deceased. In human teeth DNA appeared to be well preserved, classified as the oldest in the nation, turning the church hill into a large database of human DNA. To secure the future of this vulnerable soil archive currently an extensive interdisciplinary research (mechanical drilling, grain size, TGA, archeological remains, osteology, hydrology, dating methods, micromorphology, microfauna, molluscs, diatoms) has started in 2011 to gain knowledge on the internal structure of the mound as well as on the well-preserved nature of the archaeological evidence. In this presentation the results of this large-scale project are demonstrated in a number of cross-sections with interrelated geological and archaeological stratification. Results of GSA (including end-member analysis EMMA), TGA, XRF and micromorphology analyses are presented. Distinction between natural and anthropogenic layering is made on the occurrence of chemical elements phosphor and potassium. Results of this research are also applied in the construction of the 3D model of the subsurface (this session, abstract Roozen et al.).
Zoogeomorphology in the Anthropocene
NASA Astrophysics Data System (ADS)
Butler, David R.
2018-02-01
The Anthropocene embodies the concept of human impacts on the natural environment, but disagreements exist as to when to identify its inception/starting date. In this paper I illustrate that regardless of the proposed starting date of the Anthropocene, important zoogeomorphic impacts were initiated at each of these proposed starting dates. Humans have profoundly altered geomorphic pathways through extinctions and the near-extirpation of native populations of animal species that strongly influenced hydrology and removal of surface sediment and through the introduction of populations of animals that bring to bear a suite of different geomorphic effects on environmental systems. Domestication of animals brought its own suite of zoogeomorphic implications. Introductions of exotic species, and the spread of feral species, often led to dramatic new geomorphic landscapes because of the absence of natural controls on population expansion. In the mountains of the western USA and elsewhere, the geomorphic actions of animals are being impacted by human-induced climate change. Climate change in some cases affects the spatial pattern and range of species, whereas in other cases it may lead to the extirpation of species with zoogeomorphic impacts.
Shillapoo Wildlife Area, Annual Report 2006-2007.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Calkins, Brian
This report summarizes accomplishments, challenges and successes on WDFW's Shillapoo Wildlife Area funded under Bonneville Power Administration's (BPA) Wildlife Mitigation Program (BPA project No.2003-012-00) during the Fiscal Year 07 contract period October 1, 2006-September 30, 2007. The information presented here is intended to supplement that contained in BPA's PISCES contract development and reporting system. The organization below is by broad categories of work but references are made to individual work elements in the PISCES Statement of Work as appropriate. The greatest success realized during this contract period was significant positive changes in the vegetative community in several wetland basins throughoutmore » the wildlife area. This major goal is being achieved in part by new equipment and operation capability funded under the BPA contract, state capital and migratory bird stamp funds, and the past or ongoing investment of other partners including Ducks Unlimited, The Natural Resources Conservation Service (NRCS), Clark Public Utilities and others. We continue to be challenged by requirements under the archaeological and historic preservation act necessary to protect many sensitive sites known to occur within the wildlife area. The problems encountered to date have been largely administrative in nature and those experienced this year were unforeseen and probably unavoidable. Early in the contract period, WDFW and BPA had agreed to have a BPA staff archaeologist perform the survey and reporting work. Unexpectedly, just prior to the expected start date for the surveys, the employee resigned leaving BPA's staff short handed and necessitated contracting the work with an archaeological consultant. This delay caused us to forego work on several projects that are now deferred until the next contract period. The most notable projects impacted by this unfortunate circumstance are those involving the construction or repair of fences.« less
77 FR 5750 - Major Capital Investment Projects (NPRM); Public Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-06
...-0009] RIN 2132-AB02 Major Capital Investment Projects (NPRM); Public Meetings AGENCY: Federal Transit... Capital Investments program (``New Starts'' and ``Small Starts''). During these sessions, FTA staff will... amend the regulations for Major Capital Investment Projects at 49 CFR 611. The docket for comments on...
76 FR 22672 - Shoshone Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-22
... Committee Act. The purpose of the meeting is to continue to review Title II project proposals and start... to the public. The following business will be conducted: (1) Continue to review Title II project proposals (2) Start selecting projects to recommend to the Designated Federal Official (3) Make a decision...
The relative age effect in soccer: a match-related perspective.
Vaeyens, Roel; Philippaerts, Renaat M; Malina, Robert M
2005-07-01
Asymmetries in the distributions of birth dates in senior professional and youth soccer players have been interpreted as evidence for systematic discrimination against individuals born shortly before the cut-off date in assigning youth to specific age groups. This concept is known as the "relative age effect". The results of a longitudinal study of birth date distritubions of 2757 semi-professional and amateur senior soccer players in Belgium are presented. Records for competitive games were available in official statistics provided by the Royal Belgian Football Association. The chi-square statistic was used to examine differences between observed and expected birth date distributions. Regression analyses indicated a shift of bias when two different start dates were compared. Players born in the early part of the new age band (January to March) were over-represented compared with players born late in the new selection period (October to December). However, players with birthdays at the start of the old selection year (August) were still represented. In a retrospective analysis of 2138 players, variables indicative of match involvement, number of selections for matches, and time played were examined in relation to the relative age effect. The group of semi-professional and amateur senior soccer players born in the first quarter of the selected age band received more playing opportunities. Comparisons of birth date distributions (traditional approach to relative age effect) with match-related variables gave similar, though not entirely consistent, results. However, there were no differences for the mean number of selections and for playing minutes between players born at the start or the end of the selection year. Our findings suggest that match-based variables may provide a more reliable indication of the relative age effect in soccer.
Renfro, Lindsay A; Grothey, Axel M; Paul, James; Floriani, Irene; Bonnetain, Franck; Niedzwiecki, Donna; Yamanaka, Takeharu; Souglakos, Ioannis; Yothers, Greg; Sargent, Daniel J
2014-12-01
Clinical trials are expensive and lengthy, where success of a given trial depends on observing a prospectively defined number of patient events required to answer the clinical question. The point at which this analysis time occurs depends on both patient accrual and primary event rates, which typically vary throughout the trial's duration. We demonstrate real-time analysis date projections using data from a collection of six clinical trials that are part of the IDEA collaboration, an international preplanned pooling of data from six trials testing the duration of adjuvant chemotherapy in stage III colon cancer, and we additionally consider the hypothetical impact of one trial's early termination of follow-up. In the absence of outcome data from IDEA, monthly accrual rates for each of the six IDEA trials were used to project subsequent trial-specific accrual, while historical data from similar Adjuvant Colon Cancer Endpoints (ACCENT) Group trials were used to construct a parametric model for IDEA's primary endpoint, disease-free survival, under the same treatment regimen. With this information and using the planned total accrual from each IDEA trial protocol, individual patient accrual and event dates were simulated and the overall IDEA interim and final analysis times projected. Projections were then compared with actual (previously undisclosed) trial-specific event totals at a recent census time for validation. The change in projected final analysis date assuming early termination of follow-up for one IDEA trial was also calculated. Trial-specific predicted event totals were close to the actual number of events per trial for the recent census date at which the number of events per trial was known, with the overall IDEA projected number of events only off by eight patients. Potential early termination of follow-up by one IDEA trial was estimated to postpone the overall IDEA final analysis date by 9 months. Real-time projection of the final analysis time during a trial, or the overall analysis time during a trial collaborative such as IDEA, has practical implications for trial feasibility when these projections are translated into additional time and resources required.
An Impact Evaluation of the Resource Access Projects 1980-1981.
ERIC Educational Resources Information Center
Empson, Judith V.; And Others
This report presents findings of the fifth impact evaluation of Head Start's 15 Resource Access Projects (RAPs), offering data for the 1980-81 program year. RAPs are the designated liaison between Head Start grantees and state and local education systems, and they also train Head Start staff to work with handicapped children and their families.…
Characteristics of Young Children Exposed to Violence: The Safe Start Demonstration Project
ERIC Educational Resources Information Center
Kaufman, Joy S.; Ortega, Sandra; Schewe, Paul A.; Kracke, Kristen
2011-01-01
The Safe Start demonstration projects, funded by the Office of Juvenile Justice and Delinquency Prevention (OJJDP) under the first phase of the Safe Start initiative, are primarily designed to influence change at the systems or macrolevels to reduce the incidence of and impact of exposure to violence for children aged birth to 6 years; direct…
Arizona Head Start for Homeless Children and Families Project. 1995-96 Evaluation Report.
ERIC Educational Resources Information Center
Mulholland, Lori
Homeless families with children constitute the fastest growing segment of the United States homeless population. This study evaluated Year 2 of the Arizona Head Start for Homeless Children and Families Project, designed to meet educational and social needs of homeless children and families, and to assist Head Start agencies in developing effective…
Arizona Head Start for Homeless Children and Families Project. 1994-95 Evaluation Report.
ERIC Educational Resources Information Center
Mulholland, Lori; Greene, Andrea
Homeless families with children comprise the fastest growing segment of the United States homeless population. This study evaluated Year 1 of the Arizona Head Start for Homeless Children and Families Project, designed to meet educational and social needs of homeless children and families, and to assist Head Start agencies in developing effective…
45 CFR 1306.2 - Effective dates.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Effective dates. 1306.2 Section 1306.2 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START...
45 CFR 1306.2 - Effective dates.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 4 2011-10-01 2011-10-01 false Effective dates. 1306.2 Section 1306.2 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-09
... (Dependents' Educational Assistance (DEA) Election Request) Activity: Comment Request AGENCY: Veterans... veterans beginning date to start their DEA benefits. DATES: Written comments and recommendations on the.... Title: Dependents' Educational Assistance (DEA) Election Request, VA Form Letter 22-909. OMB Control...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
... (Dependents' Educational Assistance (DEA) Election Request) Activity: Comment Request AGENCY: Veterans... veterans beginning date to start their DEA benefits. DATES: Written comments and recommendations on the.... Title: Dependents' Educational Assistance (DEA) Election Request, VA Form Letter 22-909. OMB Control...
45 CFR 1306.2 - Effective dates.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 4 2014-10-01 2014-10-01 false Effective dates. 1306.2 Section 1306.2 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START...
45 CFR 1306.2 - Effective dates.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 4 2013-10-01 2013-10-01 false Effective dates. 1306.2 Section 1306.2 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START...
45 CFR 1306.2 - Effective dates.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 45 Public Welfare 4 2012-10-01 2012-10-01 false Effective dates. 1306.2 Section 1306.2 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START...
Concentrating Solar Power Projects - Greenway CSP Mersin Tower Plant |
Status: Operational Start Year: 2012 Do you have more information, corrections, or comments? Background CSP Start Production: 2012 Project Type: Demonstration Participants Developer(s): Greenway CSP Owner(s
Child and Family Development Research. OPRE Report 2014-89
ERIC Educational Resources Information Center
Administration for Children & Families, 2014
2014-01-01
This catalog provides short descriptions of major Division of Child and Family Development (DCFD) projects from Fiscal Year 2014. Multiple projects are described in the areas of child care, Head Start/Early Head Start, child welfare promotion, and the recognition of cultural diversity. An additional section features projects that fall into more…
Friebe, Andrea; Evans, Alina L; Arnemo, Jon M; Blanc, Stéphane; Brunberg, Sven; Fleissner, Günther; Swenson, Jon E; Zedrosser, Andreas
2014-01-01
Knowledge of factors influencing the timing of reproduction is important for animal conservation and management. Brown bears (Ursus arctos) are able to vary the birth date of their cubs in response to their fat stores, but little information is available about the timing of implantation and parturition in free-ranging brown bears. Body temperature and activity of pregnant brown bears is higher during the gestation period than during the rest of hibernation and drops at parturition. We compared mean daily body temperature and activity levels of pregnant and nonpregnant females during preimplantation, gestation, and lactation. Additionally we tested whether age, litter size, primiparity, environmental conditions, and the start of hibernation influence the timing of parturition. The mean date of implantation was 1 December (SD = 12), the mean date of parturition was 26 January (SD = 12), and the mean duration of the gestation period was 56 days (SD = 2). The body temperature of pregnant females was higher during the gestation and lactation periods than that of nonpregnant bears. The body temperature of pregnant females decreased during the gestation period. Activity recordings were also used to determine the date of parturition. The parturition dates calculated with activity and body temperature data did not differ significantly and were the same in 50% of the females. Older females started hibernation earlier. The start of hibernation was earlier during years with favorable environmental conditions. Dates of parturition were later during years with good environmental conditions which was unexpected. We suggest that free-ranging pregnant brown bears in areas with high levels of human activities at the beginning of the denning period, as in our study area, might prioritize investing energy in early denning than in early parturition during years with favorable environmental conditions, as a strategy to prevent disturbances caused by human.
Friebe, Andrea; Evans, Alina L.; Arnemo, Jon M.; Blanc, Stéphane; Brunberg, Sven; Fleissner, Günther; Swenson, Jon E.; Zedrosser, Andreas
2014-01-01
Knowledge of factors influencing the timing of reproduction is important for animal conservation and management. Brown bears (Ursus arctos) are able to vary the birth date of their cubs in response to their fat stores, but little information is available about the timing of implantation and parturition in free-ranging brown bears. Body temperature and activity of pregnant brown bears is higher during the gestation period than during the rest of hibernation and drops at parturition. We compared mean daily body temperature and activity levels of pregnant and nonpregnant females during preimplantation, gestation, and lactation. Additionally we tested whether age, litter size, primiparity, environmental conditions, and the start of hibernation influence the timing of parturition. The mean date of implantation was 1 December (SD = 12), the mean date of parturition was 26 January (SD = 12), and the mean duration of the gestation period was 56 days (SD = 2). The body temperature of pregnant females was higher during the gestation and lactation periods than that of nonpregnant bears. The body temperature of pregnant females decreased during the gestation period. Activity recordings were also used to determine the date of parturition. The parturition dates calculated with activity and body temperature data did not differ significantly and were the same in 50% of the females. Older females started hibernation earlier. The start of hibernation was earlier during years with favorable environmental conditions. Dates of parturition were later during years with good environmental conditions which was unexpected. We suggest that free-ranging pregnant brown bears in areas with high levels of human activities at the beginning of the denning period, as in our study area, might prioritize investing energy in early denning than in early parturition during years with favorable environmental conditions, as a strategy to prevent disturbances caused by human. PMID:24988486
78 FR 49372 - Notice of Availability of New Starts and Small Starts Policy Guidance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-14
...-0009] Notice of Availability of New Starts and Small Starts Policy Guidance AGENCY: Federal Transit... Administration (FTA) is issuing final policy guidance to sponsors of New Starts and Small Starts projects. This... framework for the New Starts and Small Starts evaluation and rating process; the policy guidance complements...
Economic analysis of the global polio eradication initiative.
Duintjer Tebbens, Radboud J; Pallansch, Mark A; Cochi, Stephen L; Wassilak, Steven G F; Linkins, Jennifer; Sutter, Roland W; Aylward, R Bruce; Thompson, Kimberly M
2010-12-16
The global polio eradication initiative (GPEI), which started in 1988, represents the single largest, internationally coordinated public health project to date. Completion remains within reach, with type 2 wild polioviruses apparently eradicated since 1999 and fewer than 2000 annual paralytic poliomyelitis cases of wild types 1 and 3 reported since then. This economic analysis of the GPEI reflects the status of the program as of February 2010, including full consideration of post-eradication policies. For the GPEI intervention, we consider the actual pre-eradication experience to date followed by two distinct potential future post-eradication vaccination policies. We estimate GPEI costs based on actual and projected expenditures and poliomyelitis incidence using reported numbers corrected for underreporting and model projections. For the comparator, which assumes only routine vaccination for polio historically and into the future (i.e., no GPEI), we estimate poliomyelitis incidence using a dynamic infection transmission model and costs based on numbers of vaccinated children. Cost-effectiveness ratios for the GPEI vs. only routine vaccination qualify as highly cost-effective based on standard criteria. We estimate incremental net benefits of the GPEI between 1988 and 2035 of approximately 40-50 billion dollars (2008 US dollars; 1988 net present values). Despite the high costs of achieving eradication in low-income countries, low-income countries account for approximately 85% of the total net benefits generated by the GPEI in the base case analysis. The total economic costs saved per prevented paralytic poliomyelitis case drive the incremental net benefits, which become positive even if we estimate the loss in productivity as a result of disability as below the recommended value of one year in average per-capita gross national income per disability-adjusted life year saved. Sensitivity analysis suggests that the finding of positive net benefits of the GPEI remains robust over a wide range of assumptions, and that consideration of the additional net benefits of externalities that occurred during polio campaigns to date, such as the mortality reduction associated with delivery of Vitamin A supplements, significantly increases the net benefits. This study finds a strong economic justification for the GPEI despite the rising costs of the initiative. Copyright © 2010 Elsevier Ltd. All rights reserved.
Code of Federal Regulations, 2013 CFR
2013-07-01
... evaluation. That includes costs of any engineering change proposals initiated before the date of calculations... includes costs of any engineering change proposal started before the date of calculation of the NC... NONRECURRING COSTS (NCs) ON SALES OF U.S. ITEMS § 165.3 Definitions. The following definitions apply to this...
Code of Federal Regulations, 2014 CFR
2014-07-01
... evaluation. That includes costs of any engineering change proposals initiated before the date of calculations... includes costs of any engineering change proposal started before the date of calculation of the NC... NONRECURRING COSTS (NCs) ON SALES OF U.S. ITEMS § 165.3 Definitions. The following definitions apply to this...
Concentrating Solar Power Projects - Aurora Solar Energy Project |
development Start Year: 2020 Do you have more information, corrections, or comments? Background Technology : 495,000 MWh/yr (Expected) Contact(s): Webmaster Solar Key References: Fact sheet Break Ground: 2018 Start
Concentrating Solar Power Projects - Shagaya CSP Project | Concentrating
construction Start Year: 2018 Do you have more information, corrections, or comments? Background Technology : 180,000 MWh/yr Contact(s): Webmaster Solar Start Production: 2018 Cost (approx): 385 US$ million PPA
Concentrating Solar Power Projects - ASE Demo Plant | Concentrating Solar
: Parabolic trough Turbine Capacity: Gross: 0.35 MW Status: Operational Start Year: 2013 Do you have more Start Production: 2013 Project Type: Demonstration Participants Developer(s): Archimede Solar Energy
Concentrating Solar Power Projects - Tamarugal Solar Energy Project |
Gross: 450.0 MW Status: Under development Start Year: 2021 Do you have more information, corrections, or Key References: Fact sheet Break Ground: 2018 Start Production: 2021 Participants Developer(s): Solar
Concentrating Solar Power Projects - ISCC Kuraymat | Concentrating Solar
: 20.0 MW Gross: 20.0 MW Status: Operational Start Year: 2011 Do you have more information, corrections . Contact(s): Bothayna Rashed Company: NREA Start Production: June 2011 Project Type: Commercial
Concentrating Solar Power Projects - Sundrop CSP Project | Concentrating
Start Year: 2016 Do you have more information, corrections, or comments? Background Technology: Power Ground: October 12, 2015 Start Production: October 6, 2016 Participants Developer(s): Aalborg CSP Owner(s
Enabling Astronony Research in High Schools with the START Collaboratory
NASA Astrophysics Data System (ADS)
Greenberg, G. J.; Pennypacker, C. R.
2005-12-01
The START Collaboratory is a three-year, NSF funded project to create a Web-based national astronomy research collaboratory for high school students that will bring authentic scientific research to classrooms across the country. The project brings together the resources and experience of Hands-On Universe at the University of California at Berkeley, the Sloan Digital Sky Survey / National Virtual Observatory at Johns Hopkins University and the Northwestern University Collaboratory Project. The START Collaboratory seamlessly integrates access to gigabytes of searchable data and images from the Sloan Digital Sky Survey and the NVO into Web-based research notebooks and research reports that can be shared and discussed online. Requests for observations can be made through the START Telescope Request Broker. These observations can be viewed with the START Web Visualization Tool for visualization and measurement of FITS files. The project has developed a set of research scenarios to introduce students to the resources and tools available through the START Collaboratory, and to provide a model for network-based collaboration that engages students, teachers and professional scientists. Great attention has been paid to ensuring that the research scenarios result in accurate and authentic research products that are of real interest to working astronomers. In this panel presentation, we will describe the educational benefits and opportunities being seen in pilot testing with teachers and students, and in preparations for a teacher professional development project with the Adler Planetarium.
77 FR 51032 - National Cancer Institute; Notice of Closed Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-23
... personal privacy. Name of Committee: National Cancer Institute Special Emphasis Panel, NCI Program Project... Cancer Institute Special Emphasis Panel, NCI Program Project Meeting III. Date: October 10-11, 2012. Time... Project Meeting IV. Date: October 15-16, 2012. Time: 8:00 a.m. to 5:00 p.m. Agenda: To review and evaluate...
NASA Astrophysics Data System (ADS)
Maniatis, Yannis
2012-01-01
Akrotiri was a flourishing prehistoric settlement on the Cycladic island of Santorini (Thera) until its life was ended by a huge volcanic eruption in the LCI period. There is much debate as to when this final destruction occurred. Based on the Egyptian historical dating this happened around 1540-1530 BC, while, based on radiocarbon and other scientific data, around 1640-1600 BC. This work is an attempt to date with radiocarbon the whole settlement's life starting from the earlier phases of occupation but focusing in the sequence of the latest events. The samples, coming from the deep shafts dug in the site for the pillars of the new shelter, are pieces of wood and charcoal from house architectural elements and other constructions, including the final earthquake victims temporary camps. Therefore, the dates obtained represent the beginning of the different cultural phases plus the latest events. The results provide novel absolute dates for the commencement of the LMC and LCI Phases at Akrotiri, giving mean ranges around 1820-1790 BC and 1775-1722 BC, respectively, while the final destruction is dated around 1622-1548 BC. These results show that the LCI phase started about 100 years earlier than estimated with the Egyptian Historical chronology while the final destruction around 60 years or less earlier.
Concentrating Solar Power Projects - Jülich Solar Tower | Concentrating
: 1.5 MW Gross: 1.5 MW Status: Operational Start Year: 2008 Do you have more information, corrections : July 31, 2007 Start Production: December 2008 Project Type: Demonstration Participants Developer(s
Concentrating Solar Power Projects - IRESEN 1 MWe CSP-ORC pilot project |
Start Year: 2016 Do you have more information, corrections, or comments? Background Technology: Linear : 1,700 MWh/yr Contact(s): Webmaster Solar Break Ground: 2015 Start Production: September 2016 Cost
Starting with "I": Personal Essays by Teenagers.
ERIC Educational Resources Information Center
Estepa, Andrea, Ed.; Kay, Philip, Ed.
In personal essays, teenagers express their views on serious subjects like violence, racism, and teen parenting, and discuss common teen experiences like dating, getting a job, and starting college. This collection contains the following: (1) "Brotherly Love" (Jessica Vicuna); (2) "How To Survive Shopping with Mom" (Chris Kanarick); (3) "A…
10 CFR 431.446 - Small electric motors energy conservation standards and their effective dates.
Code of Federal Regulations, 2014 CFR
2014-01-01
... full load efficiency Capacitor-start capacitor-run and capacitor-start induction-run Open motors... 10 Energy 3 2014-01-01 2014-01-01 false Small electric motors energy conservation standards and... EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL EQUIPMENT Small Electric Motors Energy Conservation...
10 CFR 431.446 - Small electric motors energy conservation standards and their effective dates.
Code of Federal Regulations, 2012 CFR
2012-01-01
... full load efficiency Capacitor-start capacitor-run and capacitor-start induction-run Open motors... 10 Energy 3 2012-01-01 2012-01-01 false Small electric motors energy conservation standards and... EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL EQUIPMENT Small Electric Motors Energy Conservation...
10 CFR 431.446 - Small electric motors energy conservation standards and their effective dates.
Code of Federal Regulations, 2013 CFR
2013-01-01
... full load efficiency Capacitor-start capacitor-run and capacitor-start induction-run Open motors... 10 Energy 3 2013-01-01 2013-01-01 false Small electric motors energy conservation standards and... EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL EQUIPMENT Small Electric Motors Energy Conservation...
22 CFR 135.42 - Retention and access requirements for records.
Code of Federal Regulations, 2010 CFR
2010-04-01
... otherwise provided, records must be retained for three years from the starting date specified in paragraph... records has been started before the expiration of the 3-year period, the records must be retained until... special arrangements with grantees and subgrantees to retain any records which are continuously needed for...
21 CFR 1403.42 - Retention and access requirements for records.
Code of Federal Regulations, 2010 CFR
2010-04-01
... otherwise provided, records must be retained for three years from the starting date specified in paragraph... records has been started before the expiration of the 3-year period, the records must be retained until... special arrangements with grantees and subgrantees to retain any records which are continuously needed for...
24 CFR 85.42 - Retention and access requirements for records.
Code of Federal Regulations, 2010 CFR
2010-04-01
... otherwise provided, records must be retained for three years from the starting date specified in paragraph... records has been started before the expiration of the 3-year period, the records must be retained until... special arrangements with grantees and subgrantees to retain any records which are continuously needed for...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
...-0004] Hazardous Materials: Improving the Safety of Railroad Transportation of Hazardous Materials... hazardous materials program. DATES: The public meeting will be held on Tuesday, February 22, 2011, starting...--Hazardous Materials, FRA Office of Safety Assurance and Compliance, at least 4 business days before the date...
Discovering and Analyzing Network Function and Structure
2015-07-08
currently assigned to the award James Lawton Reporting Period Start Date 04/01/2012 Reporting Period End Date 03/31/2015 Abstract This award has supported...AFOSR Program Manager, if any: The program manager is now James Lawton . When this award began, it was Robert Bonneau. Extensions granted or
Discovering and Analyzing Network Function and Structure
2015-07-08
Program Manager currently assigned to the award James Lawton Reporting Period Start Date 04/01/2012 Reporting Period End Date 03/31/2015 Abstract This award...any): Change in AFOSR Program Manager, if any: The program manager is now James Lawton . When this award began, it was Robert Bonneau. Extensions
Code of Federal Regulations, 2012 CFR
2012-07-01
.... That includes costs of any engineering change proposals initiated before the date of calculations of...-house DoD effort. This includes costs of any engineering change proposal started before the date of... NONRECURRING COSTS ON SALES OF U.S. ITEMS § 165.3 Definitions. (a) Cost pool. Represents the total cost to be...
2012-04-17
difficult to imagine that lethal robots would find themselves among the list of particularly inhumane weapons. Albert Einstein whose research was...REPORT DATE (DD-MM-YYYY) 17-04-2012 2. REPORT TYPE Strategy Research Project 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Enabling...Enabling Soldiers with Robots FORMAT: Strategy Research Project DATE : 17 April 2012 WORD COUNT: 5202 PAGES: 26 KEY TERMS: Ethics, Doctrine
Command Decision-Making: Experience Counts
2005-03-18
USAWC STRATEGY RESEARCH PROJECT COMMAND DECISION - MAKING : EXPERIENCE COUNTS by Lieutenant Colonel Kelly A. Wolgast United States Army Colonel Charles...1. REPORT DATE 18 MAR 2005 2. REPORT TYPE 3. DATES COVERED - 4. TITLE AND SUBTITLE Command Decision Making Experience Counts 5a. CONTRACT...Colonel Kelly A. Wolgast TITLE: Command Decision - making : Experience Counts FORMAT: Strategy Research Project DATE: 18 March 2005 PAGES: 30 CLASSIFICATION
ERIC Educational Resources Information Center
Granville, Arthur C.; Love, John M.
This brief report summarizes the analysis and conclusions presented in detail in Interim Report VI regarding the feasibility of conducting a longitudinal study of Project Developmental Continuity (PDC). This project is a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and…
How to Start Your Own Business. [Women Entrepreneurs Project.] Instructor's Guide.
ERIC Educational Resources Information Center
McNamara, Patricia P.
This guide was developed to help instructors teach the course for women entrepreneurs as presented in the text, "How to Start Your Own Business." (This small business management course, a product of the California Women Entrepreneurs Project, and the final project report are contained in two related documents--CE 017 320 and 322.) The…
This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at Licking Economic Action Development Study (LEADS) Head Start School in Buckeye Lake, Ohio. The objectives of the project were to evaluate...
NASA Astrophysics Data System (ADS)
Benetti, Sara; Clark, Chris D.; Petter Serjup, Hans
2013-04-01
This talk will present two newly funded projects on the reconstruction of former marine-based ice sheets bordering the North Atlantic Ocean and their effects on the surrounding continental margins. The NERC-funded BRITICE-CHRONO started in October 2012 and its consortium involves scientists from all over the UK with partners in Ireland, Canada and Norway. It aims to carry out a systematic campaign to collect and date material to constrain the timing and rates of change of the collapse of the former British-Irish Ice Sheet. This will be achieved by focussing on eight transects running from the shelf edge to a short distance onshore and acquiring marine and terrestrial samples for geochronometric dating. The sampling will be accomplished by two research cruises and eight fieldwork campaigns around UK and Ireland. The project will result in the world's best empirical reconstruction of a shrinking ice sheet, for use in improving ice sheet models, and to provide the long term context against which contemporary observations can be assessed. The FP7-funded Marie Curie Initial Training Networks GLANAM (Glaciated North Atlantic Margins) will start in April 2013 and aims at improving the career prospects and development of young researchers in both the public and private sector within the field of earth science, focusing specifically on North Atlantic glaciated margins. The training network comprises ten partner institutions, both academic and industrial, from Norway, UK and Denmark and will train eleven PhD and four postdoctoral researchers. The young scientists will perform multi-disciplinary research and receive training through three interconnected workpackages that collectively address knowledge gaps related to the glacial sedimentary depocentres on the North Atlantic margins. Filling these gaps will not only result in major new insights regarding glacial processes on continental margins in general, but critically will have particular impact on the exploitation of hydrocarbons in glacial sediments, notably the gas hydrate energy potential on the European continental margin, and will also provide paleoclimate information essential for understanding the role of marine-based ice sheets in the climate system.
ERIC Educational Resources Information Center
Granville, Arthur C.; And Others
This interim report, part of a series of documents examining the feasibility of the longitudinal evaluation of Project Developmental Continuity (PDC), presents the results of an analysis of PDC impact at the Head Start level, using Spring 1977 data. PDC is a Head Start Demonstration Program aimed at providing educational and developmental…
49 CFR 611.301 - Small Starts eligibility.
Code of Federal Regulations, 2014 CFR
2014-10-01
... extension to a fixed guideway, or a corridor-based bus rapid transit system, a project must: (1) Be a Small... extension to a fixed guideway, or a corridor-based bus rapid system, a project must: (1) Be a Small Starts...
49 CFR 611.301 - Small Starts eligibility.
Code of Federal Regulations, 2013 CFR
2013-10-01
... extension to a fixed guideway, or a corridor-based bus rapid transit system, a project must: (1) Be a Small... extension to a fixed guideway, or a corridor-based bus rapid system, a project must: (1) Be a Small Starts...
Concentrating Solar Power Projects - Diwakar | Concentrating Solar Power |
Gross: 100.0 MW Status: Under construction Start Year: 2013 Do you have more information, corrections ): SolarPACES Start Production: March 2013 PPA/Tariff Rate: 10.5 Rs per kWh Project Type: Commercial
Concentrating Solar Power Projects - Abhijeet Solar Project | Concentrating
%) Technology: Parabolic trough Turbine Capacity: Net: 50.0 MW Gross: 50.0 MW Status: Under construction Start Ltd. Company: Ener-t International Ltd. Start Production: 2015 PPA/Tariff Rate: 12.24 Rs per kWh
Concentrating Solar Power Projects - Agua Prieta II | Concentrating Solar
Turbine Capacity: Net: 12.0 MW Gross: 14.0 MW Status: Under construction Start Year: 2014 Do you have more ): SolarPACES Break Ground: November 2011 Start Production: 2014 Project Type: Commercial Incentives: Global
Concentrating Solar Power Projects - DEWA CSP Tower Project | Concentrating
Turbine Capacity: Net: 100.0 MW Gross: 100.0 MW Status: Under development Start Year: 2020 Do you have development Country: United Arab Emirates City: Dubai Contact(s): Webmaster Solar Break Ground: 2018 Start
Concentrating Solar Power Projects - La Risca | Concentrating Solar Power |
) project, with data organized by background, participants, and power plant configuration. Status Date : 350 Annual O&M Jobs: 31 PPA/Tariff Date: January 2010 PPA/Tariff Type: Real Decreto 661/2007 PPA
Renfro, Lindsay A.; Grothey, Axel M.; Paul, James; Floriani, Irene; Bonnetain, Franck; Niedzwiecki, Donna; Yamanaka, Takeharu; Souglakos, Ioannis; Yothers, Greg; Sargent, Daniel J.
2015-01-01
Purpose Clinical trials are expensive and lengthy, where success of a given trial depends on observing a prospectively defined number of patient events required to answer the clinical question. The point at which this analysis time occurs depends on both patient accrual and primary event rates, which typically vary throughout the trial's duration. We demonstrate real-time analysis date projections using data from a collection of six clinical trials that are part of the IDEA collaboration, an international preplanned pooling of data from six trials testing the duration of adjuvant chemotherapy in stage III colon cancer, and we additionally consider the hypothetical impact of one trial's early termination of follow-up. Patients and Methods In the absence of outcome data from IDEA, monthly accrual rates for each of the six IDEA trials were used to project subsequent trial-specific accrual, while historical data from similar Adjuvant Colon Cancer Endpoints (ACCENT) Group trials were used to construct a parametric model for IDEA's primary endpoint, disease-free survival, under the same treatment regimen. With this information and using the planned total accrual from each IDEA trial protocol, individual patient accrual and event dates were simulated and the overall IDEA interim and final analysis times projected. Projections were then compared with actual (previously undisclosed) trial-specific event totals at a recent census time for validation. The change in projected final analysis date assuming early termination of follow-up for one IDEA trial was also calculated. Results Trial-specific predicted event totals were close to the actual number of events per trial for the recent census date at which the number of events per trial was known, with the overall IDEA projected number of events only off by eight patients. Potential early termination of follow-up by one IDEA trial was estimated to postpone the overall IDEA final analysis date by 9 months. Conclusions Real-time projection of the final analysis time during a trial, or the overall analysis time during a trial collaborative such as IDEA, has practical implications for trial feasibility when these projections are translated into additional time and resources required. PMID:26989447
ERIC Educational Resources Information Center
Lee, Helen; Crowne, Sarah; Faucetta, Kristen; Hughes, Rebecca
2016-01-01
The Mother and Infant Home Visiting Program Evaluation-Strong Start (MIHOPE-Strong Start) is the largest random assignment study to date to examine the effectiveness of home visiting services on improving birth outcomes and infant and maternal health care use for expectant mothers. The study includes local home visiting programs that use one of…
ERIC Educational Resources Information Center
Love, John M.; And Others
This is the final report of the 3-year feasibility phase of a projected 7-year longitudinal evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Chapter I gives an overview of the PDC program…
Concentrating Solar Power Projects - DEWA CSP Trough Project |
: Parabolic trough Turbine Capacity: Net: 600.0 MW Gross: 600.0 MW Status: Under development Start Year: 2020 Ground: 2018 Start Production: 2020 PPA/Tariff Rate: 7.3 US cents per kWh Participants Developer(s): ACWA
Concentrating Solar Power Projects - NOOR I | Concentrating Solar Power |
) project, with data organized by background, participants, and power plant configuration. Status Date Cost (approx): 1,042 ⬠million PPA/Tariff Date: November 19, 2012 PPA/Tariff Rate: 1.62 Dirhams per
Little Goose Dam Full Flow PIT-Tag Detection System Project Summary.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Warf, Don; Livingston, Scott
2009-04-16
In 2006, the design phase of this project was kicked off and was for the most part modeled after the Full Flow PIT installation installed at Lower Monumental Dam during winter and spring of 2006 and 2007. As the Goose Full Flow design progressed and the project started to move towards construction, issues within contracting occurred and the project was put on delay for 1 year. Starting in mid December of 2008, Harcon Inc. was awarded the contract and construction of the new Goose Full Flow PIT-tag detection system began. The purpose of this document is to summarize the installationmore » of the Little Goose Full Flow project from start to finish and to highlight the notable successes and challenges that the installation presented along with the final results and current status.« less
14 CFR 120.225 - How to implement an alcohol testing program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... principal place of business prior to starting operations, (ii) Implement an FAA alcohol testing program no... District Office nearest to your principal place of business. (3) An air traffic control facility not... Specification,(ii) Implement an FAA alcohol testing program no later than the date you start operations, and...
Deciphering the evolution of the last Eurasian ice sheets
NASA Astrophysics Data System (ADS)
Hughes, Anna; Gyllencreutz, Richard; Mangerud, Jan; Svendsen, John Inge
2016-04-01
Glacial geologists need ice sheet-scale chronological reconstructions of former ice extent to set individual records in a wider context and compare interpretations of ice sheet response to records of past environmental changes. Ice sheet modellers require empirical reconstructions on size and volume of past ice sheets that are fully documented, specified in time and include uncertainty estimates for model validation or constraints. Motivated by these demands, in 2005 we started a project (Database of the Eurasian Deglaciation, DATED) to compile and archive all published dates relevant to constraining the build-up and retreat of the last Eurasian ice sheets, including the British-Irish, Scandinavian and Svalbard-Barents-Kara Seas ice sheets (BIIS, SIS and SBKIS respectively). Over 5000 dates were assessed for reliability and used together with published ice-sheet margin positions to reconstruct time-slice maps of the ice sheets' extent, with uncertainty bounds, every 1000 years between 25-10 kyr ago and at four additional periods back to 40 kyr ago. Ten years after the idea for a database was conceived, the first version of results (DATED-1) has now been released (Hughes et al. 2016). We observe that: i) both the BIIS and SBKIS achieve maximum extent, and commence retreat earlier than the larger SIS; ii) the eastern terrestrial margin of the SIS reached its maximum extent up to 7000 years later than the westernmost marine margin; iii) the combined maximum ice volume (~24 m sea-level equivalent) was reached c. 21 ka; iv) large uncertainties exist; predominantly across marine sectors (e.g. the timing of coalescence and separation of the SIS and BKIS) but also in well-studied areas due to conflicting yet equally robust data. In just three years since the DATED-1 census (1 January 2013), the volume of new information (from both dates and mapped glacial geomorphology) has grown significantly (~1000 new dates). Here, we present the DATED-1 results in the context of the climatic changes of the last glacial, discuss the implications of emerging post-census data, and describe plans for the next version of the database, DATED-2. Hughes, A. L. C., Gyllencreutz, R., Lohne, Ø. S., Mangerud, J., Svendsen, J. I. 2016: The last Eurasian ice sheets - a chronological database and time-slice reconstruction, DATED-1. Boreas, 45, 1-45. 10.1111/bor.12142
40 CFR 63.152 - General reporting and continuous records.
Code of Federal Regulations, 2013 CFR
2013-07-01
... submitted semiannually no later than 60 calendar days after the end of each 6-month period. The first report... and shall cover the 6-month period beginning on the date the Notification of Compliance Status is due... quarterly. The first semiannual period is the 6-month period starting the date the Notification of...
40 CFR 63.152 - General reporting and continuous records.
Code of Federal Regulations, 2012 CFR
2012-07-01
... submitted semiannually no later than 60 calendar days after the end of each 6-month period. The first report... and shall cover the 6-month period beginning on the date the Notification of Compliance Status is due... quarterly. The first semiannual period is the 6-month period starting the date the Notification of...
40 CFR 63.152 - General reporting and continuous records.
Code of Federal Regulations, 2011 CFR
2011-07-01
... submitted semiannually no later than 60 calendar days after the end of each 6-month period. The first report... and shall cover the 6-month period beginning on the date the Notification of Compliance Status is due... quarterly. The first semiannual period is the 6-month period starting the date the Notification of...
40 CFR 63.152 - General reporting and continuous records.
Code of Federal Regulations, 2010 CFR
2010-07-01
... submitted semiannually no later than 60 calendar days after the end of each 6-month period. The first report... and shall cover the 6-month period beginning on the date the Notification of Compliance Status is due... quarterly. The first semiannual period is the 6-month period starting the date the Notification of...
40 CFR 63.152 - General reporting and continuous records.
Code of Federal Regulations, 2014 CFR
2014-07-01
... submitted semiannually no later than 60 calendar days after the end of each 6-month period. The first report... and shall cover the 6-month period beginning on the date the Notification of Compliance Status is due... quarterly. The first semiannual period is the 6-month period starting the date the Notification of...
EPA Tools and Resources Webinar: Public Health Impact of Wildfire Smoke Emissions Specific strategies to reduce smoke exposure and the Smoke Sense App As the start of the summer wildfire season approaches, public officials, communities and individuals need up-to-date wildfire smo...
NASA Astrophysics Data System (ADS)
Hartnett, H. E.
2011-12-01
Many undergraduates express strong interests in research and in interdisciplinary sciences and yet, when it comes down to learning interdisciplinary material they are either unprepared for or overwhelmed by the complex interactions and relationships inherent in studying biogeochemical systems. My NSF-CAREER project "Transformation and transport of Organic Carbon in the Colorado River-Reservoir System" (EAR #0846188) combines field research with state-of-the-art analytical techniques to explore the source, fate and transport of terrestrial and riverine organic carbon in a heavily managed river system. In an effort to get undergraduates involved in research where they can really get their feet wet, I have been engaging undergraduates in a variety of field research projects that examine carbon biogeochemistry in the Colorado River watershed. The goal is to provide opportunities for students in Chemistry and in the Earth Sciences to directly experience the complexity of an environmental system, and to begin to ask manageable research questions that can be answered through field and lab work. These students are involved either as undergraduate research assistants, or as participants in my Field Geochemistry course which is offered through both the Dept. of Chemistry and the School of Earth and Space Exploration. There have been some unexpected challenges to getting these field-research projects started, but students are now successfully developing independent questions related to the larger scientific goals of the project and executing experimental and analytical research projects. To date, the PI has mentored 6 undergraduates and 2 graduate students as part of this project.
Nigeria`s Escravos gas project starts up
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nwokoma, M.
Nigeria`s Escravos gas project, Delta state, officially began late last year. The project -- 6,650 b/d of LPG and 1,740 b/d of condensate from 165 MMscfd of gas -- is the first attempt to rid Nigeria of incessant flares that have lit the Delta skies. Operator Chevron Nigeria Ltd. believes that the Escravos project will enable the joint venture to utilize a significant portion of the gas reserves, thus reducing gas flaring. The paper describes the background of the project, the gas fields, transport pipeline, process design, construction, and start-up.
Sox, Harold
2012-10-01
The Affordable Care Act created the Patient-Centered Outcomes Research Institute (PCORI) to help patients, clinicians, and policy makers make well-informed decisions about health care. Because its funding expires in 2019, the institute has little time in which to produce timely, practice-changing results that will build public support for comparative effectiveness research. PCORI should plan its research agenda strategically, so that it addresses research questions that comparative effectiveness research could answer quickly and decisively. To date, the institute has not chosen this path. In January 2012 PCORI's first research agenda described broad research priorities rather than specific clinical questions. The institute must drive the burgeoning discipline of comparative effectiveness research forward, starting with a research project agenda that conveys a sense of urgency and strategic direction.
The long journey to the Higgs boson and beyond at the LHC: Emphasis on ATLAS
NASA Astrophysics Data System (ADS)
Jenni, Peter
2016-09-01
The journey in search for the Higgs boson with the ATLAS and CMS experiments at the Large Hadron Collider (LHC) at CERN started more than two decades ago. But the first discussions motivating the LHC project dream date back even further into the 1980s. This article will recall some of these early historical considerations, mention some of the LHC machine milestones and achievements, focus as an example of a technological challenge on the unique ATLAS superconducting magnet system, and then give an account of the physics results so far, leading to, and featuring particularly, the Higgs boson results, and sketching finally prospects for the future. With its emphasis on the ATLAS experiment it is complementary to the preceding article by Tejinder S. Virdee which focused on the CMS experiment.
The Long Journey to the Higgs Boson and Beyond at the LHC Part II: Emphasis on ATLAS
NASA Astrophysics Data System (ADS)
Jenni, Peter
The journey in search for the Higgs boson with the ATLAS and CMS experiments at the Large Hadron Collider (LHC) at CERN started more than two decades ago. But the first discussions motivating the LHC project dream date back even further into the 1980s. This article will recall some of these early historical considerations, mention some of the LHC machine milestones and achievements, focus as an example of a technological challenge on the unique ATLAS superconducting magnet system, and then give an account of the physics results so far, leading to, and featuring particularly, the Higgs boson results, and sketching finally prospects for the future. With its emphasis on the ATLAS experiment it is complementary to the preceding article by Tejinder S. Virdee which focused on the CMS experiment.
NASA Technical Reports Server (NTRS)
Schwartz, Richard J.; McCrea, Andrew C.; Gruber, Jennifer R.; Hensley, Doyle W.; Verstynen, Harry A.; Oram, Timothy D.; Berger, Karen T.; Splinter, Scott C.; Horvath, Thomas J.; Kerns, Robert V.
2011-01-01
The Hypersonic Thermodynamic Infrared Measurements (HYTHIRM) project has been responsible for obtaining spatially resolved, scientifically calibrated in-flight thermal imagery of the Space Shuttle Orbiter during reentry. Starting with STS-119 in March of 2009 and continuing through to the majority of final flights of the Space Shuttle, the HYTHIRM team has to date deployed during seven Shuttle missions with a mix of airborne and ground based imaging platforms. Each deployment of the HYTHIRM team has resulted in obtaining imagery suitable for processing and comparison with computational models and wind tunnel data at Mach numbers ranging from over 18 to under Mach 5. This paper will discuss the detailed mission planning and coordination with the NASA Johnson Space Center Mission Control Center that the HYTHIRM team undergoes to prepare for and execute each mission.
76 FR 17408 - Combined Notice of Filings #1
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-29
... WDT SERV AG PHOTON SOLAR DOMINGUEZ PV 1 PROJECT to be effective 5/18/2011. Filed Date: 03/18/2011... Company submits tariff filing per 35.13(a)(2)(iii: SGIA WDT SERV AG PHOTON SOLAR MID COUNTIES PV 5 PROJECT...)(2)(iii: SGIA WDT SERV AG PHOTON SOLAR INDUSTRY PV 1 PROJECT to be effective 5/18/2011. Filed Date...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9287-6] Notice of a Project Waiver of Section 1605 (Buy... project waiver of the Buy American requirements of ARRA Section 1605 under the authority of Section 1605(b... has concurred on this decision to make an exception to Section 1605 of ARRA. DATES: Effective Date...
77 FR 23483 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-19
... for Emotion and Social skill promotion (CARES) project: Impact and Implementation Studies. OMB No. 0970-0364. Description: The Head Start Classroom-based Approaches and Resource for Emotion and Social skill promotion (CARES) project is evaluating social emotional program enhancements within Head Start...
Concentrating Solar Power Projects - KVK Energy Solar Project |
%) Technology: Parabolic trough Turbine Capacity: Net: 100.0 MW Gross: 100.0 MW Status: Under construction Start °22' 55.0" North, 71°46' 23.0" East Contact(s): SolarPACES Start Production: March 2013 PPA
NASA Astrophysics Data System (ADS)
Hughes, Anna; Gyllencreutz, Richard; Mangerud, Jan; Svendsen, John Inge
2017-04-01
Glacial geologists generate empirical reconstructions of former ice-sheet dynamics by combining evidence from the preserved record of glacial landforms (e.g. end moraines, lineations) and sediments with chronological evidence (mainly numerical dates derived predominantly from radiocarbon, exposure and luminescence techniques). However the geomorphological and sedimentological footprints and chronological data are both incomplete records in both space and time, and all have multiple types of uncertainty associated with them. To understand ice sheets' response to climate we need numerical models of ice-sheet dynamics based on physical principles. To test and/or constrain such models, empirical reconstructions of past ice sheets that capture and acknowledge all uncertainties are required. In 2005 we started a project (Database of the Eurasian Deglaciation, DATED) to produce an empirical reconstruction of the evolution of the last Eurasian ice sheets, (including the British-Irish, Scandinavian and Svalbard-Barents-Kara Seas ice sheets) that is fully documented, specified in time, and includes uncertainty estimates. Over 5000 dates relevant to constraining ice build-up and retreat were assessed for reliability and used together with published ice-sheet margin positions based on glacial geomorphology to reconstruct time-slice maps of the ice sheets' extent. The DATED maps show synchronous ice margins with maximum-minimum uncertainty bounds for every 1000 years between 25-10 kyr ago. In the first version of results (DATED-1; Hughes et al. 2016) all uncertainties (both quantitative and qualitative, e.g. precision and accuracy of numerical dates, correlation of moraines, stratigraphic interpretations) were combined based on our best glaciological-geological assessment and expressed in terms of distance as a 'fuzzy' margin. Large uncertainties (>100 km) exist; predominantly across marine sectors and other locations where there are spatial gaps in the dating record (e.g. the timing of coalescence and separation of the Scandinavian and Svalbard-Barents-Kara ice sheets) but also in well-studied areas due to conflicting yet apparently equally robust data. In the four years since the DATED-1 census (1 January 2013), the volume of new information (from both dates and mapped glacial geomorphology) has grown significantly ( 1000 new dates). Here, we present work towards the updated version of results, DATED-2, that attempts to further reduce and explicitly report all uncertainties inherent in ice sheet reconstructions. Hughes, A. L. C., Gyllencreutz, R., Lohne, Ø. S., Mangerud, J., Svendsen, J. I. 2016: The last Eurasian ice sheets - a chronological database and time-slice reconstruction, DATED-1. Boreas, 45, 1-45. 10.1111/bor.12142
76 FR 12980 - Center for Scientific Review; Notice of Closed Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-09
... Emphasis Panel; Program Project: Cell Biology. Date: March 29-30, 2011. Time: 8 a.m. to 5 p.m. Agenda: To... Review Special Emphasis Panel; Program Project: NeuroAIDS Applications. Date: March 30-31, 2011. Time: 8...
Intermediate Outcomes, Strategies, and Challenges of Eight Healthy Start Projects
Walker, Deborah Klein; Hargreaves, Margaret; Rosenbach, Margo
2008-01-01
Site visits were conducted for the evaluation of the national Healthy Start program to gain an understanding of how projects design and implement five service components (outreach, case management, health education, depression screening and interconceptional care) and four system components (consortium, coordination/collaboration, local health system action plan and sustainability) as well as program staff’s perceptions of these components’ influence on intermediate outcomes. Interviews with project directors, case managers, local evaluators, clinicians, consortium members, outreach/lay workers and other stakeholders were conducted during 3-day in-depth site visits with eight Healthy Start grantees. Grantees reported that both services and systems components were related to self-reported service achievements (e.g. earlier entry into prenatal care) and systems achievements (e.g. consumer involvement). Outreach, case management, and health education were perceived as the service components that contributed most to their achievements while consortia was perceived as the most influential systems component in reaching their goals. Furthermore, cultural competence and community voice were overarching project components that addressed racial/ethnic disparities. Finally, there was great variability across sites regarding the challenges they faced, with poor service availability and limited funding the two most frequently reported. Service provision and systems development are both critical for successful Healthy Start projects to achieve intermediate program outcomes. Unique contextual and community issues influence Healthy Start project design, implementation and reported accomplishments. All eight projects implement the required program components yet outreach, case management, and health education are cited most frequently for contributing to their perceived achievements. PMID:19011959
Prediction of sea ice thickness cluster in the Northern Hemisphere
NASA Astrophysics Data System (ADS)
Fuckar, Neven-Stjepan; Guemas, Virginie; Johnson, Nathaniel; Doblas-Reyes, Francisco
2016-04-01
Sea ice thickness (SIT) has a potential to contain substantial climate memory and predictability in the northern hemisphere (NH) sea ice system. We use 5-member NH SIT, reconstructed with an ocean-sea-ice general circulation model (NEMOv3.3 with LIM2) with a simple data assimilation routine, to determine NH SIT modes of variability disentangled from the long-term climate change. Specifically, we apply the K-means cluster analysis - one of nonhierarchical clustering methods that partition data into modes or clusters based on their distances in the physical - to determine optimal number of NH SIT clusters (K=3) and their historical variability. To examine prediction skill of NH SIT clusters in EC-Earth2.3, a state-of-the-art coupled climate forecast system, we use 5-member ocean and sea ice initial conditions (IC) from the same ocean-sea-ice historical reconstruction and atmospheric IC from ERA-Interim reanalysis. We focus on May 1st and Nov 1st start dates from 1979 to 2010. Common skill metrics of probability forecast, such as rank probability skill core and ROC (relative operating characteristics - hit rate versus false alarm rate) and reliability diagrams show that our dynamical model predominately perform better than the 1st order Marko chain forecast (that beats climatological forecast) over the first forecast year. On average May 1st start dates initially have lower skill than Nov 1st start dates, but their skill is degraded at slower rate than skill of forecast started on Nov 1st.
Avoiding Terminations, Single Offer Competition, and Costly Change Orders with Fixed-Price Contracts
2015-04-30
deriving performance outputs from FPDS.6 To ensure reproducibility of this analysis and to provide a starting point for future research, the entirety...available in bulk from USAspending.gov starting in FY2000. However, data quality steadily improves over that decade, particularly in the commonly...available prior to FY2007, the study team chose to set FY2007 as the start date rather than risk sample bias by including only those earlier
The START Collaboratory: Broadening Participation in Astronomy Research
NASA Astrophysics Data System (ADS)
Pennypacker, C. R.; Raddick, M. J.; Greenberg, G. J.; Hoette, V.; Meredith, K.
2005-12-01
The START Collaboratory is a three-year, NSF-funded project to create a Web-based national astronomy research collaboratory for high school students that will bring authentic scientific research to classrooms across the country. The project brings together the resources and experience of Hands-On Universe at the University of California at Berkeley, the Sloan Digital Sky Survey / National Virtual Observatory at Johns Hopkins University and the Northwestern University Collaboratory Project. START Collaboratory documents enable students to create, share and discuss Web-based astronomy research notebooks and research reports. These documents include seamless access to gigabytes of searchable data from the SDSS and the NVO. The START Collaboratory also supports observation requests to a "Telescope Request Broker" that automatically coordinates access to telescopes around the world, and a Web Visualization Tool for visualization and measurement of FITS files from professional observatories or user observations. The project has developed a set of research scenarios that use real astronomical problems to introduce students to the resources and tools available through the START Collaboratory. These scenarios also introduce a model for network-based collaboration that engages students, teachers and professional scientists. Great attention has been paid to ensuring that the research scenarios result in accurate and authentic research products that are of real interest to working astronomers. With the START Collaboratory, students will study science by doing science, generating useful scientific results just as professional astronomers do. As the third and last year of the project finalizes integrating tools and resources, an NSF-funded two-year CI-TEAM project with the Adler Planetarium will begin to create a professional development program for high school teachers interested in learning how to use the START Collaboratory to engage their students in astrophysical research. Through this program, we will begin to implement the tools and research scenarios that we have designed.
Outsourcing Pest Management on Joint Base Anacostia-Bolling
2011-12-01
These fields include reported date, actual start date, and actual finish date, as well as the type of trouble call based on the call center...3 gem.em 8 :1;3r"d D«en::e l ntelligQf’ICO Ago.nC)’ ~t~ O~~D-"!1 Of coton ~ lnc:.n.H:bc:n Q«•~e R tJI.rlil~oat<m ~ MarkOlinu Offioo En.rirm~J
System-Level Logistics for Dual Purpose Canister Disposal
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kalinina, Elena A.
2014-06-03
The analysis presented in this report investigated how the direct disposal of dual purpose canisters (DPCs) may be affected by the use of standard transportation aging and disposal canisters (STADs), early or late start of the repository, and the repository emplacement thermal power limits. The impacts were evaluated with regard to the availability of the DPCs for emplacement, achievable repository acceptance rates, additional storage required at an interim storage facility (ISF) and additional emplacement time compared to the corresponding repackaging scenarios, and fuel age at emplacement. The result of this analysis demonstrated that the biggest difference in the availability ofmore » UNF for emplacement between the DPC-only loading scenario and the DPCs and STADs loading scenario is for a repository start date of 2036 with a 6 kW thermal power limit. The differences are also seen in the availability of UNF for emplacement between the DPC-only loading scenario and the DPCs and STADs loading scenario for the alternative with a 6 kW thermal limit and a 2048 start date, and for the alternatives with a 10 kW thermal limit and 2036 and 2048 start dates. The alternatives with disposal of UNF in both DPCs and STADs did not require additional storage, regardless of the repository acceptance rate, as compared to the reference repackaging case. In comparison to the reference repackaging case, alternatives with the 18 kW emplacement thermal limit required little to no additional emplacement time, regardless of the repository start time, the fuel loading scenario, or the repository acceptance rate. Alternatives with the 10 kW emplacement thermal limit and the DPCs and STADs fuel loading scenario required some additional emplacement time. The most significant decrease in additional emplacement time occurred in the alternative with the 6 kW thermal limit and the 2036 repository starting date. The average fuel age at emplacement ranges from 46 to 88 years. The maximum fuel age at emplacement ranges from 81 to 146 years. The difference in the average and maximum age of fuel at emplacement between the DPC-only and the DPCs and STADs fuel loading scenarios becomes less significant as the repository thermal limit increases and as the repository start date increases. In general, the role of STADs is to store young (30 year or younger) high burnup (45 GWD/MTU or higher) fuel. Recommendations for future study include detailed evaluation of the feasible alternatives with regard to the costs and factors not considered in this analysis, such as worker dose, dose to members of the public, and economic benefits to host entities. It is also recommended to conduct an additional analysis to evaluate the assumption regarding the transportability and disposability of DPCs for the next iteration of the direct disposal of DPCs study.« less
ERIC Educational Resources Information Center
Brown, Eleanor A.; Dillenburger, Karola
2004-01-01
Sure Start is a Government project that aims to prevent social exclusion by targeting children between 0 and 4 years of age living in areas of social and economic deprivation. This study examined whether a Tier 2 Behaviour Support Service within a local Sure Start project was able to bring about improvements in children's behaviour and the levels…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shapiro, C.S.
1988-02-01
Projections of levels of radioactive fallout from a nuclear war are sensitive to assumptions about the structure of the nuclear stockpiles as well as the assumed scenarios for a nuclear war. Recent arms control proposals would change these parameters. This paper examines the implications of the proposed (Intermediate-range Nuclear Forces) INF treaty and (Strategic Arms Reduction Treaty) START on fallout projections from a major nuclear war. We conclude that the INF reductions are likely to have negligible effects on estimates of global and local fallout, whereas the START reductions could result in reductions in estimates of local fallout that rangemore » from significant to dramatic, depending upon the nature of the reduced strategic forces. Should a major war occur, projections of total fatalities from direct effects of blast, thermal radiation, a nd fallout, and the phenomenon known as nuclear winter, would not be significantly affected by INF and START initiatives as now drafted. 14 refs.« less
40. Photographic copy of original construction drawing, dated June 1911 ...
40. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). ROOF PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID
38. Photographic copy of original construction drawing, dated June 1911 ...
38. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). FIRST FLOOR PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID
37. Photographic copy of original construction drawing, dated June 1911 ...
37. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). BASEMENT PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID
39. Photographic copy of original construction drawing, dated June 1911 ...
39. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). SECOND FLOOR PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID
45. Photographic copy of original construction drawing, dated 16 February ...
45. Photographic copy of original construction drawing, dated 16 February 1916 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). LOT SURVEY. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID
41. Photographic copy of original construction drawing, dated June 1911 ...
41. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). CROSS SECTIONS. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID
16. Photographic copy of drawing, dated September 1924, in possession ...
16. Photographic copy of drawing, dated September 1924, in possession of San Carlos Irrigation Project. United States Indian Service, Irrigation. PIMA LATERAL HEADWORKS, RADIAL GATES - San Carlos Irrigation Project, Pima Lateral, Main Canal at Sacaton Dam, Coolidge, Pinal County, AZ
Missouri: Early Head Start Initiative
ERIC Educational Resources Information Center
Center for Law and Social Policy, Inc. (CLASP), 2012
2012-01-01
Missouri's Early Head Start/Child Care Partnership Project expands access to Early Head Start (EHS) services for children birth to age 3 by developing partnerships between federal Head Start, EHS contractors, and child care providers. Head Start and EHS contractors that participate in the initiative provide services through community child care…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gordon Tibbitts; Arnis Judzis
2002-07-01
This document details the progress to date on the OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE -- A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING contract for the quarter starting April 2002 through June 2002. Even though we are awaiting the optimization portion of the testing program, accomplishments include the following: (1) Presentation material was provided to the DOE/NETL project manager (Dr. John Rogers) for the DOE exhibit at the 2002 Offshore Technology Conference. (2) Two meeting at Smith International and one at Andergauge in Houston were held to investigate their interest in joining the Mud Hammer Performancemore » study. (3) SDS Digger Tools (Task 3 Benchmarking participant) apparently has not negotiated a commercial deal with Halliburton on the supply of fluid hammers to the oil and gas business. (4) TerraTek is awaiting progress by Novatek (a DOE contractor) on the redesign and development of their next hammer tool. Their delay will require an extension to TerraTek's contracted program. (5) Smith International has sufficient interest in the program to start engineering and chroming of collars for testing at TerraTek. (6) Shell's Brian Tarr has agreed to join the Industry Advisory Group for the DOE project. The addition of Brian Tarr is welcomed as he has numerous years of experience with the Novatek tool and was involved in the early tests in Europe while with Mobil Oil. (7) Conoco's field trial of the Smith fluid hammer for an application in Vietnam was organized and has contributed to the increased interest in their tool.« less
Cost-Savings to Medicare From Pre-Medicare Colorectal Cancer Screening.
Goede, Simon L; Kuntz, Karen M; van Ballegooijen, Marjolein; Knudsen, Amy B; Lansdorp-Vogelaar, Iris; Tangka, Florence K; Howard, David H; Chin, Joseph; Zauber, Ann G; Seeff, Laura C
2015-07-01
Many individuals have not received recommended colorectal cancer (CRC) screening before they become Medicare eligible at the age of 65. We aimed to estimate the long-term implications of increased CRC screening in the pre-Medicare population (50-64 y) on costs in the pre-Medicare and Medicare populations (65+ y). We used 2 independently developed microsimulation models [Microsimulation Screening Analysis Colon (MISCAN) and Simulation Model of CRC (SimCRC)] to project CRC screening and treatment costs under 2 scenarios, starting in 2010: "current trends" (60% of the population up-to-date with screening recommendations) and "enhanced participation" (70% up-to-date). The population was scaled to the projected US population for each year between 2010 and 2060. Costs per year were derived by age group (50-64 and 65+ y). By 2060, the discounted cumulative total costs in the pre-Medicare population were $35.7 and $28.1 billion higher with enhanced screening participation, than in the current trends scenario ($252.1 billion with MISCAN and $239.5 billion with SimCRC, respectively). Because of CRC treatment savings with enhanced participation, cumulative costs in the Medicare population were $18.3 and $32.7 billion lower (current trends: $423.5 billion with MISCAN and $372.8 billion with SimCRC). Over the 50-year time horizon an estimated 60% (MISCAN) and 89% (SimCRC) of the increased screening costs could be offset by savings in Medicare CRC treatment costs. Increased CRC screening participation in the pre-Medicare population could reduce CRC incidence and mortality, whereas the additional screening costs can be largely offset by long-term Medicare treatment savings.
Violence in Adolescent Dating Relationships
ERIC Educational Resources Information Center
Jouriles, Ernest N.; Platt, Cora; McDonald, Renee
2009-01-01
Beginning with a definition of dating and dating violence among adolescents, this article explores the factors which impact such violence. It concludes with a review of two school-based prevention/intervention programs (Safe Dates and The Youth Relationships Project). (Contains 1 table.)
33 CFR 239.9 - Effective date.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Effective date. 239.9 Section 239....9 Effective date. These regulations are applicable to all projects not approved by OCE prior to the date of this regulation. ...
Project Developmental Continuity Evaluation: Implementation Rating Instrument.
ERIC Educational Resources Information Center
High/Scope Educational Research Foundation, Ypsilanti, MI.
This instrument is part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. The Implementation Rating Instrument (IRI) was developed to provide a quantitative…
Project Developmental Continuity: PDC Classroom Observation Manual.
ERIC Educational Resources Information Center
Meece, Judy; And Others
This classroom observation manual (Fall 1976) was developed for use in the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. The manual provides detailed instructions for the observer on…
78 FR 12066 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-21
... OMB Review; Comment Request Title: Tracking of the Early Head Start Research and Evaluation Project (EHSRET) Sample. OMB No.: 0970-0388. Description: The EHSREP is a longitudinal study originally designed.../families who participated in the Early Head Start Research and Evaluation Project (EHSREP) until the...
Comparison of three NDVI time-series fitting methods in crop phenology detection in Northeast China
NASA Astrophysics Data System (ADS)
Wang, Meng; Tao, Fulu
2014-03-01
Phenological changes of cropland are the pivotal basis for farm management, agricultural production, and climate change research. Over the past decades, a range of methods have been used to extract phenological events based on satellite derived continuous vegetation index time series, however, large uncertainties still exist. In this study, three smoothing methods were compared to reduce the potential uncertainty and to quantify crop green-up dates over Northeast China. The results indicated that the crop spring onset dates estimated by three methods show variance in the dates, but with similar spatial pattern. In 60% of the study area, the standard deviation (SD) of the estimated starting date from different method is less than 10 days, while 39.5% of total pixels have SDs between 10days and 30 days. Through comparative analysis against the observation phenological data, we concluded that Asymmetric Gaussians produced the most approximative results of all, followed by Double Logistic algorithm, and Savizky-Glolay algorithm performed worst. The starting dates of crops occur mostly between May and June in this region. The Savitzky-Golay has the earliest estimates, while the Asymmetric Gaussians and Double logistic fitting method show similar and later estimates, which are more consistent with the observed data.
44. Photographic copy of original construction drawing, dated August 1911 ...
44. Photographic copy of original construction drawing, dated August 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). PLANS AND SECTIONS OF VAULTS. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID
A Nuclear Dilemma--Korean War Deja Vu
2006-03-08
USAWC STRATEGY RESEARCH PROJECT A NUCLEAR DILEMMA—KOREAN WAR DEJA VU by Lieutenant Colonel Trent A. Pickering United States Air Force Colonel William...Lieutenant Colonel Trent A. Pickering TITLE: A Nuclear Dilemma—Korean War Deja Vu FORMAT: Strategy Research Project DATE: 8 March 2006 WORD COUNT: 19,270...1. REPORT DATE 15 MAR 2006 2. REPORT TYPE 3. DATES COVERED 00-00-2005 to 00-00-2006 4. TITLE AND SUBTITLE Nuclear Dilemma--Korean War Deja
The North American species of Pholiota
Alexander H. Smith; L. R. Hesler
1968-01-01
Fries (1821) established Tribe xxii, Pholiota of Agaricus, for many of the species here placed in the genus Pholiota. The history of the genus may be said to start from this publication since it is the official starting date for the nomenclature of agarics. Although the Greek word Pholiota means scale, some glabrous species such as Agaricus caperatus were admitted to...
77 FR 43165 - Drawbridge Operation Regulation; Lafourche Bayou, LA
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-24
... delay the effective date of this rule by providing a full 30 days notice. The school year starts on or... students of South Lafourche High School requested that the start time for this bridge regulation be 15 minutes earlier, 6:45 a.m. as opposed to 7 a.m., to accommodate the school traffic in this area during...
Adolescent Females' Idolization of Male Media Stars as a Transition into Sexuality.
ERIC Educational Resources Information Center
Karniol, Rachel
2001-01-01
Examines whether feminine media stars idolized by adolescent girls provide a safe target of romantic love before girls start dating and become sexually active. Surveys of seventh and ninth grade Israeli girls indicate that idolizing feminine stars may be an intermediate step in a sequence that starts with idolizing females and continues to the…
17 CFR 240.17a-3 - Records to be made by certain exchange members, brokers and dealers.
Code of Federal Regulations, 2010 CFR
2010-04-01
... transacts a business in securities through the medium of any such member, and every broker or dealer... associated person's name, address, social security number, and the starting date of the associated person's... accounts in existence on the effective date of this section, the member, broker or dealer must obtain this...
ERIC Educational Resources Information Center
Crenshaw, Neil
The guide and the project record book included in this document are designed for 4-H members who would like to start a salt-water aquarium project. The guide includes the following topics: (1) general requirements for salt-water aquariums; (2) directions for making an aquarium; (3) suggestions for where to locate it; (4) pros and cons of using…
PCB Content of Sediments Collected at Manistique Harbor, Michigan
2014-06-01
2013 10:19 PM Page 23 of 35 Date Reported: 1/24/2013 Original WO#: 1211282RTI Laboratories - DATES REPORT Leachate Date USACE- Detroit District...REPORT Leachate Date USACE- Detroit District Manistique Harbor 0004 Client: Project: Sample ID Test NameMatrixCollection DateClient Sample ID Analysis
2016-12-01
United States v. Knotts.9 Analysis of previous cases provides a starting point for discussion between government officials and the public they...authorized under this ordinance to deploy this technology. At the start of the legislative session in the fall of 2015, Senator John Kavanagh, a...2015, through April 30, 2016 (a span of approximately 15 months). The start date of this query is intended to correspond with the operational
Inomata, Takeshi; Triadan, Daniela; MacLellan, Jessica; Burham, Melissa; Aoyama, Kazuo; Palomo, Juan Manuel; Yonenobu, Hitoshi; Pinzón, Flory; Nasu, Hiroo
2017-01-01
The lowland Maya site of Ceibal, Guatemala, had a long history of occupation, spanning from the Middle Preclassic Period through the Terminal Classic (1000 BC to AD 950). The Ceibal-Petexbatun Archaeological Project has been conducting archaeological investigations at this site since 2005 and has obtained 154 radiocarbon dates, which represent the largest collection of radiocarbon assays from a single Maya site. The Bayesian analysis of these dates, combined with a detailed study of ceramics, allowed us to develop a high-precision chronology for Ceibal. Through this chronology, we traced the trajectories of the Preclassic collapse around AD 150–300 and the Classic collapse around AD 800–950, revealing similar patterns in the two cases. Social instability started with the intensification of warfare around 75 BC and AD 735, respectively, followed by the fall of multiple centers across the Maya lowlands around AD 150 and 810. The population of Ceibal persisted for some time in both cases, but the center eventually experienced major decline around AD 300 and 900. Despite these similarities in their diachronic trajectories, the outcomes of these collapses were different, with the former associated with the development of dynasties centered on divine rulership and the latter leading to their downfalls. The Ceibal dynasty emerged during the period of low population after the Preclassic collapse, suggesting that this dynasty was placed under the influence from, or by the direct intervention of, an external power. PMID:28115691
Inomata, Takeshi; Triadan, Daniela; MacLellan, Jessica; Burham, Melissa; Aoyama, Kazuo; Palomo, Juan Manuel; Yonenobu, Hitoshi; Pinzón, Flory; Nasu, Hiroo
2017-02-07
The lowland Maya site of Ceibal, Guatemala, had a long history of occupation, spanning from the Middle Preclassic Period through the Terminal Classic (1000 BC to AD 950). The Ceibal-Petexbatun Archaeological Project has been conducting archaeological investigations at this site since 2005 and has obtained 154 radiocarbon dates, which represent the largest collection of radiocarbon assays from a single Maya site. The Bayesian analysis of these dates, combined with a detailed study of ceramics, allowed us to develop a high-precision chronology for Ceibal. Through this chronology, we traced the trajectories of the Preclassic collapse around AD 150-300 and the Classic collapse around AD 800-950, revealing similar patterns in the two cases. Social instability started with the intensification of warfare around 75 BC and AD 735, respectively, followed by the fall of multiple centers across the Maya lowlands around AD 150 and 810. The population of Ceibal persisted for some time in both cases, but the center eventually experienced major decline around AD 300 and 900. Despite these similarities in their diachronic trajectories, the outcomes of these collapses were different, with the former associated with the development of dynasties centered on divine rulership and the latter leading to their downfalls. The Ceibal dynasty emerged during the period of low population after the Preclassic collapse, suggesting that this dynasty was placed under the influence from, or by the direct intervention of, an external power.
NASA Astrophysics Data System (ADS)
Beach, T.; Luzzadder-Beach, S.; Krause, S.; Doyle, C.
2015-12-01
The Maya Lowlands is mostly an internally draining karst region with about 400 m of regional relief. Fluvial and fluviokarst systems drain the edges of this landscape either from low limestone uplands or igneous and metamorphic complexes. Thus far most fluvial research has focused around archaeology projects, and here we review the extant research conducted across the region and new research on the transboundary Rio Bravo watershed of Belize and Guatemala. The Rio Bravo drains a largely old growth tropical forest today, but was partly deforested around ancient Maya cities and farms from 3,000 to 1000 BP. Several studies estimate that 30 to 40 percent of forest survived through the Maya period. Work here has focused on soils and sediment movement along slope catenas, in floodplain sites, and on contributions from groundwater with high dissolved loads of sulfate and calcium. We review radiocarbon dates and present new dates and soil stratigraphy from these sequences to date slope and floodplain movement, and we estimate ancient land use from carbon isotopic and pollen evidence. Aggradation in this watershed occurred by flooding, gypsum precipitation, upland erosion, and ancient Maya canal building and filling for wetland farming. Soil erosion and aggradation started at least by 3,000 BP and continued through the ancient Maya period, though reduced locally by soil conservation, post urban construction, and source reduction, especially in Maya Classic period from 1700 to 1000 BP.
A Conceptual Framework for Adaptive Project Management in the Department of Defense
2016-04-30
schedule work) established a core set of principles that went unchallenged until the start of the 21st century. This belief that managing...detailed planning, task decomposition and assignment of hours at the start of a project as unnecessary, often wasted effort that sacrifices accuracy...with the illusion of precision. Work, at the task level, is best assigned by the team performing the work as close as possible to the actual start
77 FR 13610 - Proposed Information Collection Activity; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-07
... Information Collection Activity; Comment Request Proposed Project Title: Head Start Facilities Construction, Purchase and Major Renovations. OMB No.: 0970-0193. Description: The Head Start Bureau is proposing to.... The part contains the administrative requirements applicable to Head Start and Early Head Start...
Schmidt, Benedikt R; Hödl, Walter; Schaub, Michael
2012-03-01
Performance in one stage of a complex life cycle may affect performance in the subsequent stage. Animals that start a new stage at a smaller size than conspecifics may either always remain smaller or they may be able to "catch up" through plasticity, usually elevated growth rates. We study how size at and date of metamorphosis affected subsequent performance in the terrestrial juvenile stage and lifetime fitness of spadefoot toads (Pelobates fuscus). We analyzed capture-recapture data of > 3000 individuals sampled during nine years with mark-recapture models to estimate first-year juvenile survival probabilities and age-specific first-time breeding probabilities of toads, followed by model selection to assess whether these probabilities were correlated with size at and date of metamorphosis. Males attained maturity after two years, whereas females reached maturity 2-4 years after metamorphosis. Age at maturity was weakly correlated with metamorphic traits. In both sexes, first-year juvenile survival depended positively on date of metamorphosis and, in males, also negatively on size at metamorphosis. In males, toads that metamorphosed early at a small size had the highest probability to reach maturity. However, because very few toadlets metamorphosed early, the vast majority of male metamorphs had a very similar probability to reach maturity. A matrix projection model constructed for females showed that different juvenile life history pathways resulted in similar lifetime fitness. We found that the effects of date of and size at metamorphosis on different juvenile traits cancelled each other out such that toads that were small or large at metamorphosis had equal performance. Because the costs and benefits of juvenile life history pathways may also depend on population fluctuations, ample phenotypic variation in life history traits may be maintained.
Project Developmental Continuity Evaluation: Site Visitors' Manual.
ERIC Educational Resources Information Center
Morris, Mary; Smith, Allen
This site visitors' manual is part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. The PDC evaluation documents and analyzes the process of program…
76 FR 73740 - Submission for OMB Review; Comments Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-29
... technology. DATES: Comments must be received within 60 calendar-days of publication of this Notice. ADDRESSES... investor per project. Type of Respondents: Business or other institution (except farms); not-for-profit... support, significant managerial relationship) to the projects that OPIC finances. Dated: November 21, 2011...
76 FR 3641 - National Heart, Lung, and Blood Institute; Notice of Closed Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-20
... Institute Special Emphasis Panel, Program Project in Cardiovascular Diseases. Date: February 8, 2011. Time... Blood Institute Special Emphasis Panel, Program Project in Cardiovascular Diseases. Date: February 9... Vascular Diseases Research; 93.838, Lung Diseases Research; 93.839, Blood Diseases and Resources Research...
Climate change effect on Betula (birch) and Quercus (oak) pollen seasons in US
Zhang, Yong; Bielory, Leonard; Georgopoulos, Panos G.
2013-01-01
Climatic change is expected to affect the spatiotemporal patterns of airborne allergenic pollen, which has been found to act synergistically with common air pollutants, such as ozone, to cause Allergic Airway Disease (AAD). Observed airborne pollen data from six stations from 1994 to 2011 at Fargo (North Dakota), College Station (Texas), Omaha (Nebraska), Pleasanton (California), Cherry Hill and Newark (New Jersey) in the US were studied to examine climate change effects on trends of annual mean and peak value of daily concentrations, annual production, season start, and season length of Betula (birch) and Quercus (oak) pollen. The Growing Degree Hour (GDH) model was used to establish a relationship between start/end dates and differential temperature sums using observed hourly temperatures from surrounding meteorology stations. Optimum GDH models were then combined with meteorological information from the Weather Research and Forecasting (WRF) model, and land use land coverage data from the Biogenic Emissions Land use Database, version 3.1 (BELD3.1), to simulate start dates and season lengths of birch and oak pollen for both past and future years across the contiguous US (CONUS). For most of the studied stations, comparison of mean pollen indices between the periods of 1994–2000 and 2001–2011 showed that birch and oak trees were observed to flower 1–2 weeks earlier; annual mean and peak value of daily pollen concentrations tended to increase by 13.6%–248%. The observed pollen season lengths varied for birch and for oak across the different monitoring stations. Optimum initial date, base temperature, and threshold GDH for start date was found to be March 1, 8°C, and 1879 hours respectively for birch; March 1, 5°C, and 4760 hours respectively for oak. Simulation results indicated that responses of birch and oak pollen seasons to climate change are expected to vary for different regions. PMID:23793955
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-06
... regulating ponds to accommodate the changing pattern of water demand and increased urbanization. DATES: Date... Water Efficiency Project AGENCY: Central Utah Project Completion Act Office, Interior. ACTION: Notice of... amended, the Department of the Interior, the Central Utah Water Conservancy District, and the Utah...
43. Photographic copy of original construction drawing, dated June 1911 ...
43. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). NORTH ELEVATION (NORTH SIDE) AND WEST ELEVATION (WEST SIDE). - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID
42. Photographic copy of original construction drawing, dated June 1911 ...
42. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). EAST ELEVATION (EAST SIDE) AND SOUTH ELEVATION (SOUTH SIDE). - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID
Panni, M K; Shah, S J; Chavarro, C; Rawl, M; Wojnarwsky, P K; Panni, J K
2013-10-01
There are multiple components leading to improved operating room efficiency. We undertook a project focusing on first case starts; accounting for each delay component on a global basis. Our hypothesis was there would be a reduction in first start delays after we implemented strategies to address the issues identified through this accounting process. An orange sheet checklist was implemented, with specific items that needed to be clear prior to roll back to the operating room (OR), and an OR facilitator was employed to intervene whenever there were any missing items needed for a specific patient. We present the data from this quality improvement project over an 18-month period. Initially, 10.07 (± 0.73) delayed first starts occurred per day but declined steadily over time to a low of 4.95 (± 0.38) per day after 6 months (-49.2 %, P < 0.001). By the end of the project, the most common reasons for delay still included late surgical attending (19%), schedule changes (14%) as well as 'other reasons' (13%), but with an overall reduction per day of each. Total anaesthesia delay initially totalled 11% of the first start delays, but was negligible (< 1%) at the project's completion. While we have a challenging operating room environment based on our patient population, multiple trainees in both the surgery and anaesthesiology teams: an orange sheet - pre-operative checklist in addition to a dedicated pre-operative facilitator; allowed us to make a substantial improvement in our first start on time starts. © 2013 The Acta Anaesthesiologica Scandinavica Foundation. Published by John Wiley & Sons Ltd.
When To Let Your Teenager Start Dating
... Healthy Living Healthy Living Healthy Living Nutrition Fitness Sports Oral Health Emotional Wellness Growing Healthy Sleep Safety & Prevention Safety & Prevention Safety and Prevention Immunizations ...
Fire Prevention in California's Riverside County Headstart Project: An Evaluation.
ERIC Educational Resources Information Center
Folkman, William S.; Taylor, Jean
Results of evaluation are reported for a safety program devised by Head Start teachers and California Division of Forestry personnel to teach fire prevention education to Head Start children. Chapters describe the place of fire prevention in Head Start and causes of fire starting behavior in children. The Head Start Fire Prevention Kit is also…
40 CFR 63.7130 - What notifications must I submit and when?
Code of Federal Regulations, 2010 CFR
2010-07-01
...) through (j) that apply to you, by the dates specified. (b) As specified in § 63.9(b)(2), if you start up... you start up your affected source. (d) If you are required to conduct a performance test, you must... before the close of business on the 30th calendar day following the completion of the initial compliance...
40 CFR 63.9640 - What notifications must I submit and when?
Code of Federal Regulations, 2010 CFR
2010-07-01
... the specified dates. (b) As specified in § 63.9(b)(2), if you start up your affected source before... 30, 2003. (c) As specified in § 63.9(b)(3), if you start up your new affected source on or after... close of business on the 30th calendar day following completion of the initial compliance demonstration...
The Talkies: Articles and Illustrations from a Great Fan Magazine 1928-1940.
ERIC Educational Resources Information Center
Griffith, Richard
"Photoplay" Magazine is the source of these articles and photographs, which date from the start of the sound era to the start of World War II. Sections are devoted to stars, living and working in Hollywood, contributions of the production crew to films, trends in motion pictures, and a sample of film fans' favorite columns. (JK)
26 CFR 1.72-5 - Expected return.
Code of Federal Regulations, 2010 CFR
2010-04-01
...) of § 1.72-9 under the age (as of the annuity starting date) and, if applicable, sex of the measuring... case the date of purchase), the annuitant's age at his nearest birthday is 66, the expected return is... Table I, male, age 66 14.4 Expected return (1,200×14.4) 17,280 If, however, the taxpayer had purchased...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-03
... Bureau adopted a single 90-day mandatory negotiation period for the remaining incumbent licensees that... the date for completion of mandatory negotiations. However, the freeze does not apply to applications... negotiations. Thirty days before the start date for each NPSPAC region other than Region 47 and Region 48, the...
Air Temperature, Heat Sums, and Pollen Shedding Phenology of Longleaf Pine
William D. Boyer
1972-01-01
Between 1957 and 1966, pollen shedding by longleaf pine (Pinus palustris Mill.) in southwestern Alabama peaked at dates ranging from February 23 to April 3. January 1 and 50°F was the combination of starting date and threshold air temperature that minimized annual variations in heat sums before the trees flowered. The heat sum required for peak...
75 FR 67379 - Center for Scientific Review; Notice of Closed Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-02
...: Weight Loss, Obesity and Physical Activity. Date: November 15, 2010. Time: 10 a.m. to 11:30 a.m. Agenda..., Bethesda, MD 20892 (Telephone Conference Call). Contact Person: Lee S. Mann, PhD, Scientific Review Officer... Research Transition (A-START) in Drug Abuse and HIV/AIDS. Date: November 29, 2010. Time: 11 a.m. to 4 p.m...
1992-06-01
connected to one MPS via BROUTERS and modems ). b. MPS - RMMS interface to the GMCC. The IMCS software running on the MPS will.be used to monitor the...Start Date: TODAYS DATE REGION: SO Sector: 56K 69. GPWS: Press FI0 (PRODUCE REPORT) to generate the report. 70. GPWS: Press F12 (REPORT STATUS) to
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-06
... Change To Delay the Operative Date of Rule 11.20A Regarding Market-Wide Circuit Breakers Due to... the market- wide circuit breakers on a pilot basis for a period scheduled to start on February 4, 2013... changed to April 8, 2013. The proposal would delay the operative date of the market-wide circuit breaker...
24 CFR 266.628 - Initial claim payments.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Contract... as of the date of default, plus interest at the mortgage note rate from date of default to date of...
The Effects of Course-Related Service Projects in a Child Development Course
ERIC Educational Resources Information Center
Conner, David B.
2004-01-01
A Head Start volunteer project was designed for a college-level child development course and implemented in three different sections of the class across two semesters. Overall, 70 students participated (65 females and 5 males) with assessment data collected from student volunteers and Head Start teachers and administrators. Students reported a…
Golden Gardens: A Wildlife Gardening Program for Seniors.
ERIC Educational Resources Information Center
Pike, Judy
This document is a guide for older persons who are beginner gardeners. It provides 16 projects to choose from and explains what is needed for each before getting started. Each chapter contains projects suitable for small, medium, and large garden spaces. Contents include: (1) "Getting Started"; (2) "Beckoning Birds, Bees, and Butterflies"; (3)…
PROJECT HEAD START MEDICAL--A GUIDE FOR DIRECTION OF CHILD DEVELOPMENT CENTERS.
ERIC Educational Resources Information Center
Office of Economic Opportunity, Washington, DC.
HEALTH SERVICES OF PROJECT HEAD START CHILD DEVELOPMENT CENTERS PROVIDE--A MEDICAL EVALUATION OF EACH CHILD INCLUDING MEDICAL HISTORY, DEVELOPMENTAL ASSESSMENT, AND PHYSICAL EXAMINATION, SCREENING TESTS FOR VISION, HEARING, SPEECH, AND TUBERCULOSIS, LABORATORY TESTS OF URINE FOR ALBUMIN AND TESTS OF SUGAR AND BLOOD FOR ANEMIA, DENTAL ASSESSMENT,…
78 FR 2038 - Notice of Availability of Proposed New Starts and Small Starts Policy Guidance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-09
... policy guidance will accompany the final rule for Major Capital Investment Projects published elsewhere... policy guidance on the review and evaluation process and criteria for major capital investment projects... capital investment program authorized at 49 U.S.C. 5309. Both the new regulation and the proposed policy...
Beta: An Experiment in Funded Undergraduate Start-Up
ERIC Educational Resources Information Center
Jones, Paul; Forbes-Simpson, Kellie; Maas, Gideon; Newbery, Robert
2015-01-01
This paper reports on an evaluation of a funded undergraduate project designed to enable student business start-up. The programme, entitled "Beta", provides undergraduate students with £1,500 of seed-corn funding. The key objective of the project is for the participants to exit it with a viable and legal business entity through which…
Project Re-Start. A Program for Homeless Adults.
ERIC Educational Resources Information Center
Pelzer, Dagmar F.; And Others
Project Re-Start, of the Dade County Public Schools in Florida, was funded under the Adult Education Act and the Stewart B. McKinney Homeless Assistance Act. Classes in literacy skills, General Educational Development (GED) preparation, English for speakers of other languages, employability skills, and life coping skills were conducted at most of…
Buoy Technology survey USCG Buoy Development Review
1990-10-01
by the United States Coadst Guard, IALA Conference, No. 3.1.5, Tokyo, 1980 . 3P.H. Glage, Design, Procurement and Testing of Plastic Fast Water Buoys on...may include published reports, unpublished reports, and USCG files. 23 PROJECT SUMMARY NO. 1 ARTICULATED BEACON DEVELOPMENT DATES: 1980 to Present...PROJECT DATE’%: 1980 to Present OBJECTIVE: The purpose of this project is to design a special buoy for use in exposed offshore locations where high
Unmanned Systems: A Lab-Based Robotic Arm for Grasping
2015-06-01
Reduction Project (0704-0188) Washington, DC 20503. 1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE June 2015 3. REPORT TYPE AND DATES COVERED...experiments. The focus of this project is to understand and apply the kinematics and dynamics for a 6 degree of freedom (DOF) Kinova JACO robotic arm...Implementation, (3) and Operational Demonstrations This research project centered on Phase 1, while focusing on three subareas: • JACO Manipulator Set Up And
The archives of the glacier survey of the Austrian Alpine Club
NASA Astrophysics Data System (ADS)
Fischer, Andrea; Bendler, Gebhard
2016-04-01
The archive of the Austrian Alpine Club holds masses of material on glaciers and their former extent. The material includes descriptions and sketches of the summits conquered by early mountaineers, mapping campaigns and data from early scientific expeditions as well as data on glacier length change. To date a large proportion of the glaciological information in the material has not been catalogued or analysed. As cold ice, containing relevant climate information, might still exist at the highest peaks of Austria, a pilot project was started to collect some of the data of two test sites in Tyrol, in Silvretta and Ötztal Alps, to reveal former summit shapes and glacier tongue positions. Additional information on the number and position of crevasses as well as firn extent is often evident from the material. Challenging tasks not yet tackled are compiling a catalogue of the material and defining an analysis scheme.
Three-dimensional temporomandibular joint modeling and animation.
Cascone, Piero; Rinaldi, Fabrizio; Pagnoni, Mario; Marianetti, Tito Matteo; Tedaldi, Massimiliano
2008-11-01
The three-dimensional (3D) temporomandibular joint (TMJ) model derives from a study of the cranium by 3D virtual reality and mandibular function animation. The starting point of the project is high-fidelity digital acquisition of a human dry skull. The cooperation between the maxillofacial surgeon and the cartoonist enables the reconstruction of the fibroconnective components of the TMJ that are the keystone for comprehension of the anatomic and functional features of the mandible. The skeletal model is customized with the apposition of the temporomandibular ligament, the articular disk, the retrodiskal tissue, and the medial and the lateral ligament of the disk. The simulation of TMJ movement is the result of the integration of up-to-date data on the biomechanical restrictions. The 3D TMJ model is an easy-to-use application that may be run on a personal computer for the study of the TMJ and its biomechanics.
Sentinel-1 SAR Deployment Testing- Lessons Learned
NASA Astrophysics Data System (ADS)
Schwarz, Sebastian; Alberti, Mathias V.
2015-09-01
On April 3rd 2014, ESA has launched the Sentinel-1A spacecraft with its SAR instrument payload. During the first 12 hours in space, the antenna was released and successfully deployed to its operational configuration. Almost 6 years before that date, the first conceptual considerations regarding integration, alignment and on- ground deployment testing took place. Starting in these early phases of the project, the paper contains an overview of the concepts and trades which were performed to identify the most suitable off-loading MGSE for this heavy and fragile antenna. Following that, the challenges and lessons learned during the different developments of this test setup are discussed. This includes MGSE specific topics, such as the minimization of structural deformation under load or the optimization of the pulley arrangement as result of a coupled multibody analysis. On the other hand, load and deformation control strategies for the flight hardware, as well as safety related aspects are covered.
Uversky, Vladimir N
2013-01-01
The current literature on intrinsically disordered proteins is blooming. A simple PubMed search for “intrinsically disordered protein OR natively unfolded protein” returns about 1,800 hits (as of June 17, 2013), with many papers published quite recently. To keep interested readers up to speed with this literature, we are starting a “Digested Disorder” project, which will encompass a series of reader’s digest type of publications aiming at the objective representation of the research papers and reviews on intrinsically disordered proteins. The only two criteria for inclusion in this digest are the publication date (a paper should be published within the covered time frame) and topic (a paper should be dedicated to any aspect of protein intrinsic disorder). The current digest covers papers published during the period of January, February and March of 2013. The papers are grouped hierarchically by topics they cover, and for each of the included paper a short description is given on its major findings. PMID:28516015
The Buffer-Gas Positron Accumulator and Resonances in Positron-Molecule Interactions
NASA Technical Reports Server (NTRS)
Surko, C.M.
2007-01-01
This is a personal account of the development of our buffer-gas positron trap and the new generation of cold beams that these traps enabled. Dick Drachman provided much appreciated advice to us from the time we started the project. The physics underlying trap operation is related to resonances (or apparent resonances) in positron-molecule interactions. Amusingly, experiments enabled by the trap allowed us to understand these processes. The positron-resonance "box score" to date is one resounding "yes," namely vibrational Feshbach resonances in positron annihilation on hydrocarbons; a "probably" for positron-impact electronic excitation of CO and NZ;an d a "maybe" for vibrational excitation of selected molecules. Two of these processes enabled the efficient operation of the trap, and one almost killed it in infancy. We conclude with a brief overview of further applications of the trapping technology discussed here, such as "massive" positron storage and beams with meV energy resolution.
A thermal shield concept for the Solar Probe mission
NASA Technical Reports Server (NTRS)
Miyake, Robert N.; Millard, Jerry M.; Randolph, James E.
1991-01-01
The Solar Probe spacecraft will travel to within 4 solar radii of the sun's center while performing a variety of fundamental experiments in space physics. Exposure to 2900 earth suns (400 W/sq cm) at perihelion imposes severe thermal and material demands on a solar shield system designed to protect the payload that will reside within the shield's shadow envelope or umbra. The design of the shield subsystem is a thermal/materials challenge requiring new technology development. While currently in the preproject study phase, anticipating a 1995 project start, shield preliminary design efforts are currently underway. This paper documents the current status of the mission concept, the materials issues, the configuration concept for the shield subsystem, the current configuration studies performed to date, and the required material testing to provide a database to support a design effort required to develop the shield subsystem.
Forecasting The Onset Of The East African Rains
NASA Astrophysics Data System (ADS)
MacLeod, D.; Palmer, T.
2017-12-01
The timing of the rainy seasons is critical for East Africa, where many livelihoods depend on rain-fed agriculture. The exact onset date of the rains varies from year to year and a delayed start has significant implications for food security. Early warning of anomalous onset can help mitigate risks by informing farmer decisions on crop choice and timing of planting. Onset forecasts may also pre-warn governments and NGOs of upcoming need for financial support and humanitarian intervention. Here we assess the potential to forecast the onset of both the short and long rains over East Africa at subseasonal to seasonal timescales. Based on operational reforecasts from ECMWF, we will demonstrate skilful prediction of onset anomalies. An investigation to determine potential sources of this forecast skill will also be presented. This work has been carried out as part of the project ForPAc: "Towards forecast-based preparedness action".
Hexavalent Chromium Substitution Projects
2011-05-12
Hexavalent Chromium Substitution Projects Date (12 May 2011) Gene McKinley ASC/WNV (937) 255-3596 Gene.McKinley@wpafb.af.mil Aeronautical Systems...valid OMB control number. 1. REPORT DATE 12 MAY 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE Hexavalent ...A-10) – AETC (T-6, T-38 and T1A) • Both Cr Primers & Non-Cr primers as well as Cr Surface Treatment – F-22 8 Non- Chrome Tie-coat & touch-up
Head Start on Science Preliminary Findings.
ERIC Educational Resources Information Center
Ritz, William C.; Von Blum, Ruth
For many Head Start teachers and staff, the word "science" conjures up uncomfortable feelings and memories. The purpose of this project--a collaborative effort of California State University, Long Beach and the Head Start Program of Long Beach Unified School District (LBUSD)--was to prepare Head Start staff to become more capable,…
NASA Astrophysics Data System (ADS)
Shabani, Farzin; Kumar, Lalit; Solhjouy-fard, Samaneh
2017-08-01
The aim of this study was to have a comparative investigation and evaluation of the capabilities of correlative and mechanistic modeling processes, applied to the projection of future distributions of date palm in novel environments and to establish a method of minimizing uncertainty in the projections of differing techniques. The location of this study on a global scale is in Middle Eastern Countries. We compared the mechanistic model CLIMEX (CL) with the correlative models MaxEnt (MX), Boosted Regression Trees (BRT), and Random Forests (RF) to project current and future distributions of date palm ( Phoenix dactylifera L.). The Global Climate Model (GCM), the CSIRO-Mk3.0 (CS) using the A2 emissions scenario, was selected for making projections. Both indigenous and alien distribution data of the species were utilized in the modeling process. The common areas predicted by MX, BRT, RF, and CL from the CS GCM were extracted and compared to ascertain projection uncertainty levels of each individual technique. The common areas identified by all four modeling techniques were used to produce a map indicating suitable and unsuitable areas for date palm cultivation for Middle Eastern countries, for the present and the year 2100. The four different modeling approaches predict fairly different distributions. Projections from CL were more conservative than from MX. The BRT and RF were the most conservative methods in terms of projections for the current time. The combination of the final CL and MX projections for the present and 2100 provide higher certainty concerning those areas that will become highly suitable for future date palm cultivation. According to the four models, cold, hot, and wet stress, with differences on a regional basis, appears to be the major restrictions on future date palm distribution. The results demonstrate variances in the projections, resulting from different techniques. The assessment and interpretation of model projections requires reservations, especially in correlative models such as MX, BRT, and RF. Intersections between different techniques may decrease uncertainty in future distribution projections. However, readers should not miss the fact that the uncertainties are mostly because the future GHG emission scenarios are unknowable with sufficient precision. Suggestions towards methodology and processing for improving projections are included.
Antidepressants and the risk of suicidal behaviors.
Jick, Hershel; Kaye, James A; Jick, Susan S
2004-07-21
The relation between use of antidepressants, especially selective serotonin reuptake inhibitors (SSRIs), and suicidal ideation and behaviors has received considerable public attention recently. The use of such drugs among teenagers has been of particular concern. To estimate the relative risks (RRs) of nonfatal suicidal behavior in patients starting treatment with 1 of 3 antidepressant drugs compared with patients starting treatment with dothiepin. Matched case-control study of patients treated in UK general practices using the UK General Practice Research Database for 1993-1999. The base population included 159,810 users of the 4 antidepressant drugs. Participants could have used only 1 of these antidepressants and had to have received at least 1 prescription for the study antidepressant within 90 days before their index date (the date of suicidal behavior or ideation for cases and the same date for matched controls). Frequency of first-time exposure to amitriptyline, fluoxetine, paroxetine, and dothiepin of patients with a recorded diagnosis of first-time nonfatal suicidal behavior or suicide compared with comparable patients who did not exhibit suicidal behavior. After controlling for age, sex, calendar time, and time from first antidepressant prescription to the onset of suicidal behavior, the relative risks for newly diagnosed nonfatal suicidal behavior in 555 cases and 2062 controls were 0.83 (95% confidence interval, [CI] 0.61-1.13) for amitriptyline, 1.16 (95% CI, 0.90-1.50) for fluoxetine, and 1.29 (95% CI, 0.97-1.70) for paroxetine compared with those using dothiepin. The RR for suicidal behavior among patients first prescribed an antidepressant within 1 to 9 days before their index date was 4.07 (95% CI, 2.89-5.74) compared with patients who were first prescribed an antidepressant 90 days or more before their index date. Time since first antidepressant prescription was not, however, a confounder of the relation between specific antidepressants and suicidal behavior since its relation to suicidal behavior was not materially different among users of the 4 study drugs. Similarly for fatal suicide, the RR among patients who were first prescribed an antidepressant within 1 to 9 days before their index date was 38.0 (95% CI, 6.2-231) compared with those who were first prescribed an antidepressant 90 days or more before their index date. There were no significant associations between the use of a particular study antidepressant and the risk of suicide. The risk of suicidal behavior after starting antidepressant treatment is similar among users of amitriptyline, fluoxetine, and paroxetine compared with the risk among users of dothiepin. The risk of suicidal behavior is increased in the first month after starting antidepressants, especially during the first 1 to 9 days. A possible small increase in risk (bordering statistical significance) among those starting the newest antidepressant, paroxetine, is of a magnitude that could readily be due to uncontrolled confounding by severity of depression. Based on limited information, we also conclude that there is no substantial difference in effect of the 4 drugs on people aged 10 to 19 years.
He, Yong; Wang, Hong; Qian, Budong; McConkey, Brian; DePauw, Ron
2012-01-01
Shorter growing season and water stress near wheat maturity are the main factors that presumably limit the yield potential of spring wheat due to late seeding in Saskatchewan, Canada. Advancing seeding dates can be a strategy to help producers mitigate the impact of climate change on spring wheat. It is unknown, however, how early farmers can seed while minimizing the risk of spring frost damage and the soil and machinery constraints. This paper explores early seeding dates of spring wheat on the Canadian Prairies under current and projected future climate. To achieve this, (i) weather records from 1961 to 1990 were gathered at three sites with different soil and climate conditions in Saskatchewan, Canada; (ii) four climate databases that included a baseline (treated as historic weather climate during the period of 1961-1990) and three climate change scenarios (2040-2069) developed by the Canadian global climate model (GCM) with the forcing of three greenhouse gas (GHG) emission scenarios (A2, A1B and B1); (iii) seeding dates of spring wheat (Triticum aestivum L.) under baseline and projected future climate were predicted. Compared with the historical record of seeding dates, the predicted seeding dates were advanced under baseline climate for all sites using our seeding date model. Driven by the predicted temperature increase of the scenarios compared with baseline climate, all climate change scenarios projected significantly earlier seeding dates than those currently used. Compared to the baseline conditions, there is no reduction in grain yield because precipitation increases during sensitive growth stages of wheat, suggesting that there is potential to shift seeding to an earlier date. The average advancement of seeding dates varied among sites and chosen scenarios. The Swift Current (south-west) site has the highest potential for earlier seeding (7 to 11 days) whereas such advancement was small in the Melfort (north-east, 2 to 4 days) region. The extent of projected climate change in Saskatchewan indicates that growers in this region have the potential of earlier seeding. The results obtained in this study may be used for adaptation assessments of seeding dates under possible climate change to mitigate the impact of potential warming.
76 FR 13195 - Center for Scientific Review; Notice of Closed Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-10
...: Center for Scientific Review Special Emphasis Panel; Program Project: Presynaptic Mechanisms of Neural...: AIDS/HIV Innovative Research Applications. Date: March 30, 2011. Time: 11 a.m. to 7 p.m. Agenda: To... Special Emphasis Panel; Program Project: Mitochondrial Metabolism. Date: April 4-5, 2011. Time: 8 a.m. to...
ERIC Educational Resources Information Center
Zurer, Pamela S.
1983-01-01
Research projects and methodology in archeochemistry are discussed. Topics include radiocarbon dating, thermoluminescence, amino acid dating, obsidian hydration dating, bone studies, metals/metallurgy, pottery, stone/glass, and future directions. Includes reports on funding, insights into nuclear waste/environmental problems provided by…
Wave Energy from the North Sea: Experiences from the Lysekil Research Site
NASA Astrophysics Data System (ADS)
Leijon, Mats; Boström, Cecilia; Danielsson, Oskar; Gustafsson, Stefan; Haikonen, Kalle; Langhamer, Olivia; Strömstedt, Erland; Stålberg, Magnus; Sundberg, Jan; Svensson, Olle; Tyrberg, Simon; Waters, Rafael
2008-05-01
This paper provides a status update on the development of the Swedish wave energy research area located close to Lysekil on the Swedish West coast. The Lysekil project is run by the Centre for Renewable Electric Energy Conversion at Uppsala University. The project was started in 2004 and currently has permission to run until the end of 2013. During this time period 10 grid-connected wave energy converters, 30 buoys for studies on environmental impact, and a surveillance tower for monitoring the interaction between waves and converters will be installed and studied. To date the research area holds one complete wave energy converter connected to a measuring station on shore via a sea cable, a Wave Rider™ buoy for wave measurements, 25 buoys for studies on environmental impact, and a surveillance tower. The wave energy converter is based on a linear synchronous generator which is placed on the sea bed and driven by a heaving point absorber at the ocean surface. The converter is directly driven, i.e. it has no gearbox or other mechanical or hydraulic conversion system. This results in a simple and robust mechanical system, but also in a somewhat more complicated electrical system.
Building the Green Bank Telescope
NASA Astrophysics Data System (ADS)
Kellermann, Kenneth I.
2017-01-01
In a previous presentation, I reported on how the freak collapse of the NRAO 300-ft transit radio telescope led to the inclusion of $75 million for a new radio telescope in the 1989 Congressional Emergency Supplemental Appropriations Act. But, this was only the beginning. NRAO was faced with challenging specifications and an unworkable schedule, but there was no design and no project team. Only one bid was even close to the Congressional appropriation. In an attempt to meet the unrealistic antenna delivery date, the contractor started construction of the foundation and fabrication of antenna members before the design was finished, leading to retrofits, redesign, and multiple delays. The antenna contractor was twice sold to other companies leading to further delays and cost escalation. In order to recoup their mounting losses, the new owners sued NRAO for $29 million for claimed design changes, and NRAO countersued demanding to be reimbursed for added project management costs and lost scientific data resulting from the seven-year delay in the completion of the telescope. Legal fees and a small net award in favor of the contractor left NRAO and the NSF with a nine million dollar bill which NSF handled by an innovative accounting adjustment.
Bullying: a stepping stone to dating aggression?
Josephson, Wendy L; Pepler, Debra
2012-01-01
Bullying is the use of power and aggression to control and distress another. In this paper, we review research to explore whether the lessons learned in bullying provide a stepping stone to aggressive behavior in dating relationships. We start by considering definitions and a relationship framework with which to understand both bullying and dating aggression. We consider bullying from a developmental-contextual perspective and consider risk factors associated with the typical developmental patterns for bullying and dating aggression, including developmental and sociodemographic, individual attributes, and family, peer group, community, and societal relationship contexts that might lead some children and youths to follow developmental pathways that lead to bullying and dating aggression. We conclude by discussing implications for intervention with a review of evidence-based interventions.
California Hydrogen Infrastructure Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heydorn, Edward C
2013-03-12
Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a real-world retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation's hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The projectmore » also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling stations with a focus on safe, convenient, fast-fills. These potential areas were then compared to and overlaid with suitable sites from various energy companies and other potential station operators. Work continues to match vehicle needs with suitable fueling station locations. Once a specific site was identified, the necessary agreements could be completed with the station operator and expected station users. Detailed work could then begin on the site drawings, permits, safety procedures and training needs. Permanent stations were successfully installed in Irvine (delivered liquid hydrogen), Torrance (delivered pipeline hydrogen) and Fountain Valley (renewable hydrogen from anaerobic digester gas). Mobile fueling stations were also deployed to meet short-term fueling needs in Long Beach and Placerville. Once these stations were brought online, infrastructure data was collected and reported to DOE using Air Products Enterprise Remote Access Monitoring system. Feedback from station operators was incorporated to improve the station user's fueling experience.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gordon Tibbitts; Arnis Judzis
2001-04-01
This document details the progress to date on the OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE -- A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING contract for the quarter starting January 2001 through March 2001. Accomplishments to date include the following: (1) On January 9th of 2001, details of the Mud Hammer Drilling Performance Testing Project were presented at a ''kick-off'' meeting held in Morgantown. (2) A preliminary test program was formulated and prepared for presentation at a meeting of the advisory board in Houston on the 8th of February. (3) The meeting was held with the advisorymore » board reviewing the test program in detail. (4) Consensus was achieved and the approved test program was initiated after thorough discussion. (5) This new program outlined the details of the drilling tests as well as scheduling the test program for the weeks of 14th and 21st of May 2001. (6) All the tasks were initiated for a completion to coincide with the test schedule. (7) By the end of March the hardware had been designed and the majority was either being fabricated or completed. (8) The rock was received and cored into cylinders.« less
NASA Astrophysics Data System (ADS)
Kiss, Andrea; Wilson, Rob; Holawe, Franz; Strömmer, Elisabeth; Bariska, István.
2010-05-01
We present an almost 500-year May-July temperature reconstruction based on 24 biophysical series. 19 are vine-related series from Kőszeg, Szombathely and Sopron in Western Hungary (11 series, from 1580s onwards), Vienna, Klosterneuburg, Perchtoldsdorf (7 series; at present from 1520s onwards) in Eastern Austria and Bratislava in Western Slovakia (1 series, from 1770s onwards). At present, the first, largest group is the vine related indicators, where dates of blossoming (1 series), beginning of grape ripening (3 series), dates of full ripening (2 series), beginning of grapevine harvest (8 series), starting dates of pressing out the juice (1 series: at present 1520s onwards), starting dates of tax-collection (after the pressed juice: 1 series) and wine quality indices (3 series: from 1580s onwards) are also included. The second main group of 4 indicators applied in the analysis are grain-harvest related indicators from Western Hungary, such as dates for estimation of harvesting-shares which are strongly dependant on the beginning of grain harvesting (at present 2 series: from 1640s onwards) and dates of grain tax collection (2 series: from 1560s onwards). A third group, still in development, is mainly related to more natural vegetation, and is strongly dependent on the full ripening of oak acorns: the starting dates of woodland pasture (at present 1 series: from 1770s onwards). The above-mentioned historical series correlate well, over the 18th-19th century period, with Vienna May-July measured temperature (Böhm, et. al. 2009). The complicated nature of these historical data is described (e.g. with respect to the normality of the data distribution), and we present methods to transform and composite the data into a homogenous, homoscedastic time-series that can be used for proxy based calibration. Finally, a preliminary May-July temperature reconstruction is derived using modified dendrochronological methods. (see Leijonhufvud et al. 2009) The Kőszeg, Szombathely, Sopron and Bratislava series and all presented analyses were developed within the framework of the EU project 'Millenium'. The Austrian series are partly based on published series (Pribram 1938, Lauscher 1985, Strömmer 2003) although in some cases modified and extended for this study, as well as newly developed data. The present work is a continuation of the 'Analysis of late spring-summer temperatures for Western Hungary based on vine, grain tithes and harvest records', presented at the annual congress of EGU in 2009 (Kiss and Wilson 2009). References Böhm, R., Jones, P.D., Hiebl, J., Frank, D., Brunetti, M., Maugeri and M. 2009: The early instrumental warm-bias: a solution for long central European temperature series 1760-2007. Climatic Change, doi: 10.1007/s10584-009-9649-4. Kiss, A. and Wilson, R. 2009: Analysis of late spring-summer temperatures for Western Hungary based on vine, grain tithes and harvest records. Geophysical Research Abstracts Vol 11, EGU2009-10945-1. Lauscher, F. 1985: Beiträge zur Wetterchronik seit dem Mittelalter. In: Sitzungsberichte, Abtheilung II, Mathematische, Physikalische und Technische Wissenschaften, Band 194, Heft 1-3. pp. 93-131. Leijonhufvud, L., Wilson, R., Möberg, A., Söderberg, J., Retső, D. and Söderlind, U. 2009: Five centuries of Stockholm winter/spring temperatures reconstructed from documentary evidence and instrumental observations. Climatic Change, doi: 10.1007/s10584-009-9650-y. Pribram, A. F. 1938: Materialien zur Geschichte der Preise und Löhne in Österreich. Band. I. Carl Ueberreuters Verlag, Wien. pp. 364-370. Strömmer, E. 2003: Klima-Geschichte. Methoden der Rekonstruction und historische Perspektive. Ostösterreich 1700 bis 1830. Forschungen und Beiträge zur Wiener Stadtgescichte 39. Franz Deuticke, Wien. pp. 59-71.
Code of Federal Regulations, 2010 CFR
2010-07-01
... system. (8) A description of the experimental design, including methods for the control of bias. (9... being conducted. (4) The proposed experimental start and termination dates. (5) Justification for...
Code of Federal Regulations, 2013 CFR
2013-07-01
... system. (8) A description of the experimental design, including methods for the control of bias. (9... being conducted. (4) The proposed experimental start and termination dates. (5) Justification for...
Code of Federal Regulations, 2012 CFR
2012-07-01
... system. (8) A description of the experimental design, including methods for the control of bias. (9... being conducted. (4) The proposed experimental start and termination dates. (5) Justification for...
Code of Federal Regulations, 2011 CFR
2011-07-01
... system. (8) A description of the experimental design, including methods for the control of bias. (9... being conducted. (4) The proposed experimental start and termination dates. (5) Justification for...
Code of Federal Regulations, 2014 CFR
2014-07-01
... system. (8) A description of the experimental design, including methods for the control of bias. (9... being conducted. (4) The proposed experimental start and termination dates. (5) Justification for...
ERIC Educational Resources Information Center
Smith, Allen G.; And Others
This interim report describes the development of program implementation and cost studies for Year II of the process evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Specific areas focused…
ERIC Educational Resources Information Center
Wisconsin Early Childhood Association, Madison.
A collection of 26 fact sheets on child care administration produced by the Wisconsin Child Care Improvement Project from 1986 through 1989 is presented. Individual fact sheets concern: national trends, center start-up, family day care start-up, site and facility acquisition, public funding, effective center operation, reporting of child abuse and…
ERIC Educational Resources Information Center
Callahan, Carolyn M.; Tomlinson, Carol A.; Moon, Tonya R.; Tomchin, Ellen M.; Plucker, Jonathan A.
This monograph describes Project START (Support To Affirm Rising Talent), a three-year collaborative research effort to develop and apply gifted identification procedures based on Howard Gardner's (1983) theory of multiple intelligences. Specifically, the study attempted to: (1) develop identification procedures; (2) identify high-potential…
How to Start Your Own Business. Women Entrepreneurs Project. Instructional Materials.
ERIC Educational Resources Information Center
McCaslin, Barbara S.; McNamara, Patricia P.
This text consisting of eight learning activities packages (LAP's) was developed during the California Women Entrepreneurs Project for use in a course designed to help women entrepreneurs learn how to start their own small business. The LAP's included here are self-paced, student-centered modules which take the learner step by step through the…
Fair Start for Children: Lessons Learned from Seven Demonstration Projects.
ERIC Educational Resources Information Center
Larner, Mary, Ed.; And Others
In the early 1980s, the Ford Foundation launched a grants program called Child Survival/A Fair Start for Children (CS/FS) that addressed issues related to birth and infant health and development among families that were poor and underserved by traditional human services. This book reports on each of seven CS/FS projects, describing the concerns…
Project W-211 initial tank retrieval systems year 2000 compliance assessment project plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
BUSSELL, J.H.
1999-08-24
This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-211, Initial Tank Retrieval Systems (ITRS). The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The scope of project W-211 is to provide systems for retrieval of radioactive wastes from ten double-shell tanks (DST). systems will be installed in tanks 102-AP, 104-AP, 105-AN, 104-AN, 102-AZ, 101-AW, 103-AN, 107-AN, 102-AY, and 102-SY. The current tank selection and sequence supports phasemore » I feed delivery to privatized processing plants. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase. This assessment will describe the methods, protocols, and practices to assure that equipment and systems do not have Y2K problems.« less
40 CFR 63.1454 - What notifications must I submit and when?
Code of Federal Regulations, 2010 CFR
2010-07-01
... you by the specified dates. (b) As specified in § 63.9(b)(2), if you start your affected source before... specified in § 63.9(b)(3), if you start your new affected source on or after June 12, 2002, you must submit... the notification of compliance status before the close of business on the 30th calendar day following...
Code of Federal Regulations, 2012 CFR
2012-07-01
... to Ensenada Yacht Race Sponsor Newport Ocean Sailing Association. Event Description Sailing vessel race; open ocean. Date Fourth Friday in April. Location Newport Beach, CA. Regulated Area Starting area only. All waters of the Pacific Ocean near Newport Beach, CA bounded by a line starting 33°35′18″ N...
Clinical Investigation Program RCS MED-300 (R1).
1985-09-30
of Group A Streptococcus ......................................... 193 Work Unit No. 85/17 (FY85,T) Serological Survey of Epstein - Barr Virus ...Prot No: 85/17 Status: Terminated Title: Serological Survey of Epstein - Barr Virus Infections Followed Over a 12-Month Period Start Date: Est Comp Date...Principal Investigator: Facility: CPT C.A. Borchert, MC Dept/Sec: Pediatrics Assoc Investigators Key Words: Epstein - Barr Virus Accumulative MEDCASE Est
Secreted HSP Vaccine for Malaria Prophylaxis
2015-10-01
Award Number: W81XWH-13-2-0098 TITLE: Secreted HSP Vaccine for Malaria Prophylaxis PRINCIPAL INVESTIGATOR: Dr. Natasa Strbo CONTRACTING...REPORT DATE October 2015 2. REPORT TYPE Annual 3. DATES COVERED 30 Sep 2014 - 29 Sep 2015 4. TITLE AND SUBTITLE Secreted HSP Vaccine for Malaria ...We have also started manufacturing GMP-grade vaccine material for use in non-human primate studies . 15. SUBJECT TERMS- Malaria , Plasmodium
Clinical Investigation Program Report.
1981-10-01
Accumulative Periodic Review C t -None ........ C -- 5" -- - s :-T Study Objective: Gastroesophageal reflux disease (GERD) refers to a clinT-aTWdF-sv i66...13 The Use of Metoclopramide to Facilitate Emergent Upper Intestinal Endoscopy. (0) 1980 G-80-14 Daytime Gastroesophageal Reflux : Characterization and...G-80-14 Status: Terminated Title: Daytime Gastroesophageal Reflux : Characterization and Specific Th erapy. Start Date: 10 Jun 80 Est Comp Date
Clinical Investigation Program Report.
1983-10-01
metastatic to liver. (0) H-83-63. Double-blind, randomized parallel comparison of two different dosage regimens of naproxen sodium in patients with...different dosage regimens of naproxen sodium in patients with bone pain due to m etastatic cancer. Start Date: May 83 Est Comp Date: Indefinite Principal...Investigator: Facility: LTC D Gandara, MD LAMC CPT R Mansour, MD D ept/Svc: Associate Investigators: Hematology-Oncology Key Words: naproxen sodium
40 CFR Appendix A to Subpart A of... - Tables
Code of Federal Regulations, 2010 CFR
2010-07-01
... phone number ✓ ✓ (6) FIPS code ✓ ✓ (7) Facility ID codes ✓ ✓ (8) Unit ID code ✓ ✓ (9) Process ID code... for Reporting on Emissions From Nonpoint Sources and Nonroad Mobile Sources, Where Required by 40 CFR... start date ✓ ✓ (3) Inventory end date ✓ ✓ (4) Contact name ✓ ✓ (5) Contact phone number ✓ ✓ (6) FIPS...
The Development of a Course Sequence in Real-Time Systems Design
1993-08-01
project was implemented in C. 3 A group of students used the material learned in this course in their...homework assignments are used to assess the students learning U process. The term project is to be done in teams of 2 to 4 students and it starts very...assignments are used to assess the students learning I process. The term project is to be done in teams of 2 to 4 students and it starts very early in the
Promoting 21st Century Skills in the Classroom through the Use of Authentic Student Research
NASA Astrophysics Data System (ADS)
Klug, S. L.; Swann, J. L.; Manfredi, L.; Christensen, P. R.
2012-12-01
Preparing students for the workforce starts well before they start college. The Mars Student Imaging Project has incorporated 21st Century Skills into their project to help the students practice and sharpen these skills. Professional development for the educational facilitators helps the teachers become familiar with these skills. By augmenting the authentic research project with these 21st Century Skills, the students are able to achieve a higher level experience that mirrors the real-world workforce.
7 CFR 1721.106 - Repayment of deferred payments.
Code of Federal Regulations, 2012 CFR
2012-01-01
... note for repayment starting in year 2008. (b) Deferments relating to the ERC loan program, renewable energy project(s), distributed generation project(s), and the contribution(s)-in-aid of construction. An...
7 CFR 1721.106 - Repayment of deferred payments.
Code of Federal Regulations, 2014 CFR
2014-01-01
... note for repayment starting in year 2008. (b) Deferments relating to the ERC loan program, renewable energy project(s), distributed generation project(s), and the contribution(s)-in-aid of construction. An...
7 CFR 1721.106 - Repayment of deferred payments.
Code of Federal Regulations, 2011 CFR
2011-01-01
... note for repayment starting in year 2008. (b) Deferments relating to the ERC loan program, renewable energy project(s), distributed generation project(s), and the contribution(s)-in-aid of construction. An...
7 CFR 1721.106 - Repayment of deferred payments.
Code of Federal Regulations, 2013 CFR
2013-01-01
... note for repayment starting in year 2008. (b) Deferments relating to the ERC loan program, renewable energy project(s), distributed generation project(s), and the contribution(s)-in-aid of construction. An...
7 CFR 1721.106 - Repayment of deferred payments.
Code of Federal Regulations, 2010 CFR
2010-01-01
... note for repayment starting in year 2008. (b) Deferments relating to the ERC loan program, renewable energy project(s), distributed generation project(s), and the contribution(s)-in-aid of construction. An...
Impacts of Climate Change on the Timing of the Production Season of Maple Syrup in Eastern Canada
Côté, Benoît; Logan, Travis; Power, Hugues; Charron, Isabelle; Duchesne, Louis
2015-01-01
Maple syrup production is an important economic activity in north-eastern North-America. The beginning and length of the production season is linked to daily variation in temperature. There are increasing concerns about the potential impact of climatic change on this industry. Here, we used weekly data of syrup yield for the 1999–2011 period from 121 maple stands in 11 regions of Québec (Canada) to predict how the period of production may be impacted by climate warming. The date at which the production begins is highly variable between years with an average range of 36 days among the regions. However, the average start date for a given region, which ranged from Julian day 65 to 83, was highly predictable (r2 = 0.88) using the average temperature from January to April (TJ-A). A logistic model predicting the weekly presence or absence of production was also developed. Using the inputs of 77 future climate scenarios issued from global models, projections of future production timing were made based on average TJ-A and on the logistic model. The projections of both approaches were in very good agreement and suggest that the sap season will be displaced to occur 15–19 days earlier on average in the 2080–2100 period. The data also show that the displacement in time will not be accompanied by a greater between years variability in the beginning of the season. However, in the southern part of Québec, very short periods of syrup production due to unfavourable conditions in the spring will occur more frequently in the future although their absolute frequencies will remain low. PMID:26682889
Impacts of Climate Change on the Timing of the Production Season of Maple Syrup in Eastern Canada.
Houle, Daniel; Paquette, Alain; Côté, Benoît; Logan, Travis; Power, Hugues; Charron, Isabelle; Duchesne, Louis
2015-01-01
Maple syrup production is an important economic activity in north-eastern North-America. The beginning and length of the production season is linked to daily variation in temperature. There are increasing concerns about the potential impact of climatic change on this industry. Here, we used weekly data of syrup yield for the 1999-2011 period from 121 maple stands in 11 regions of Québec (Canada) to predict how the period of production may be impacted by climate warming. The date at which the production begins is highly variable between years with an average range of 36 days among the regions. However, the average start date for a given region, which ranged from Julian day 65 to 83, was highly predictable (r2 = 0.88) using the average temperature from January to April (TJ-A). A logistic model predicting the weekly presence or absence of production was also developed. Using the inputs of 77 future climate scenarios issued from global models, projections of future production timing were made based on average TJ-A and on the logistic model. The projections of both approaches were in very good agreement and suggest that the sap season will be displaced to occur 15-19 days earlier on average in the 2080-2100 period. The data also show that the displacement in time will not be accompanied by a greater between years variability in the beginning of the season. However, in the southern part of Québec, very short periods of syrup production due to unfavourable conditions in the spring will occur more frequently in the future although their absolute frequencies will remain low.
7 CFR 987.112a - Grade, size, and container requirements for each outlet category.
Code of Federal Regulations, 2010 CFR
2010-01-01
... shall be designated by the Committee for each market research project. The handling of each lot of dates... containers for testing in connection with a research project conducted by or in cooperation with the... dates have been converted from their whole or pitted form, they may be shipped to any market in the...
Coast Guard: Progress Being Made on Deepwater Project, but Risks Remain
2001-05-01
Risks Remain GAO-01-564 Form SF298 Citation Data Report Date ("DD MON YYYY") 00MAY2001 Report Type N/A Dates Covered (from... to) ("DD MON YYYY...34) Title and Subtitle COAST GUARD: Progress Being Made on Deepwater Project, but Risks Remain Contract or Grant Number Program Element Number Authors...for this project. As agreed with your office, this report focuses on the major risks facing the Subject Terms Document Classification unclassified
ERIC Educational Resources Information Center
Macias, Jose; And Others
This report contains the field plan and implementation procedures which were utilized for the observational/focused ethnographic component of Head Start's Child and Family Mental Health (CFMH) Evaluation Project. The introductory section of the document provides the reader with an overview of the Head Start program, its mental health goals, the…
ERIC Educational Resources Information Center
Spencer, Lynn, Ed.
These 7 case studies are part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Each case study reviews the planning year at a PDC demonstration site in one…
ERIC Educational Resources Information Center
Spencer, Lynn, Ed.
These 8 case studies are part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Each case study reviews the planning year at a PDC demonstration site in one…
ERIC Educational Resources Information Center
Granville, Arthur C.; And Others
This interim report of a pilot year impact study on evaluation methodology is part of a series of documents on the evaluation of Project Developmental Continuity, a Head Start demonstration program aimed at promoting educational and developmental continuity between children's Head Start and primary school experiences. This report deals with…
GenCade Version 1 Quick-Start Guide: How to Start a Successful GenCade Project
2015-03-01
Properly defining the inlets is a crucial part of a GenCade project and can be difficult. A user should become familiar with the Inlet Reservoir Model ( IRM ...GenCade Report 2 provide additional documentation on IRM variable names and functions. 3.9.4 Export data The data may easily be exported to a text
Project Head Start 1969 - 1970: A Descriptive Report of Programs and Participants.
ERIC Educational Resources Information Center
Bureau of the Census (DOC), Suitland, MD.
This report is the third in a series describing the range of children, their families, and staff members who have participated in Project Head Start and the center activities in which they have been involved. The data presented here offer a general picture of the various populations served and activities in which they participated during the Full…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wu, Ko-Jen
2011-12-31
This report summarizes activities conducted for the project “The Use of Exhaust Gas Recirculation to Optimized Fuel Economy and Minimize Emissions in Engines Operating on E85 Fuel” under COOPERATIVE AGREEMENT NUMBER DE-FC26-07NT43271, which are as outlined in the STATEMENT OF PROJECT OBJECTIVES (SOPO) dated March 2007 and in the supplemental SOPO dated October 2010. The project objective was to develop and demonstrate an internal combustion engine that is optimized for E85 (85% ethanol and 15% gasoline) fuel operation to achieve substantially improved fuel economy while operating with E85 fuel and that is also production viable in the near- to medium-term.more » The key engine technology selected for research and development was turbocharging, which is known to improve fuel economy thru downsizing and is in particular capable of exploiting ethanol fuel’s characteristics of high octane number and high latent heat of vaporization. The engine further integrated synergistic efficiency improving technologies of cooled exhaust gas recirculation (EGR), direct fuel injection and dual continuously variable intake and exhaust cam phasers. On the vehicle level, fuel economy was furthered thru powertrain system optimization by mating a state-of-the-art six-speed automatic transmission to the engine. In order to achieve the project’s objective of near- to medium-term production viability, it was essential to develop the engine to be flex-fuel capable of operating with fuels ranging from E0 (0% ethanol and 100% gasoline) to E85 and to use three-way type of catalyst technology for exhaust aftertreatment. Within these scopes, various technologies were developed through systems approach to focus on ways to help accelerate catalyst light-off. Significant amount of development took place during the course of the project within General Motors, LLC. Many prototype flex-fuel engines were designed, built and developed with various hardware configurations selected to achieve the project goals. Several flex-fuel demonstration vehicles were designed and built for carrying out calibration development and final testing to quantify the technology merits. Based on the extensive test results collected from dynamometer and vehicle testing, the fuel economy benefits of cooled EGR from the intended level of turbocharger technology were quantified. When combined with turbo downsizing, the FE benefits are considered large enough for E0 fuel as well as for E85 fuel to warrant further development of the technology beyond the current proof-of-concept level to a level that can meet production driveability quality and durability requirements in order to meet customers’ expectations. Cold-start cart test results from the emissions segment of the project were positive, confirming the assumption of faster thermal response of turbo exhaust system for emissions reductions for both E0 and E85 fuels. Vehicle emissions test results directionally correlated to the cold-start cart findings. The limited number of test runs did demonstrate the potentials of meeting stringent emission standards, however, they did not comprehend the factors such as hardware variability and long-term durability, 3 which are essential for mass production to satisfy customers’ expectations. It is therefore recommended, moving forward, durability concerns over turbocharger, EGR system and aftertreatment system, which would likely impact production viability, should be addressed. The data moreover suggested that further FE increase is likely with turbocharger technology advancement.« less
The Effects of Head Start Health Services: Executive Summary of the Head Start Health Evaluation.
ERIC Educational Resources Information Center
Fosburg, Linda B.; And Others
This report summarizes findings of an evaluation of Head Start health services. Chapter one presents an overview of the background of the evaluation project. Chapter two highlights findings for the major evaluation questions. These questions focus specifically on children's health status prior to entry into Head Start, health services subsequently…
Impact of cold climates on vehicle emissions: the cold start air toxics pulse : final report.
DOT National Transportation Integrated Search
2016-09-21
This project measured cold start emissions from four vehicles in winter using fast response instrumentation to accurately measure the : time variation of the cold start emission pulse. Seventeen successful tests were conducted over a temperature rang...
National Date Palm Germplasm Repository
USDA-ARS?s Scientific Manuscript database
The National Clonal Germplasm Repository for Citrus & Dates (NCGRCD), located in Riverside, California USA, is a project of the Agricultural Research Service (ARS) of the United States Department of Agriculture (USDA). The NCGRCD maintains a collection of germplasm of date palm (Phoneix dactylifera ...
24 CFR 954.507 - Submission of project completion reports.
Code of Federal Regulations, 2010 CFR
2010-04-01
... request for the project. If a satisfactory Project Completion Report is not submitted by the due date, HUD... approvals will remain suspended until a satisfactory Project Completion Report is received. (Approved by the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... the test system. (8) A description of the experimental design, including methods for the control of... at which the study is being conducted. (4) The proposed experimental start and termination dates. (5...
Code of Federal Regulations, 2012 CFR
2012-07-01
... the test system. (8) A description of the experimental design, including methods for the control of... at which the study is being conducted. (4) The proposed experimental start and termination dates. (5...
Code of Federal Regulations, 2013 CFR
2013-07-01
... the test system. (8) A description of the experimental design, including methods for the control of... at which the study is being conducted. (4) The proposed experimental start and termination dates. (5...
Code of Federal Regulations, 2011 CFR
2011-07-01
... the test system. (8) A description of the experimental design, including methods for the control of... at which the study is being conducted. (4) The proposed experimental start and termination dates. (5...
2015-06-01
extensive and highly successful military careers started in this personal and professional relationship, directly contributing to the humanitarian aid and...The Navy program, started in 2005, follows the Army’s single-track model for language- enabled officers. The Marine Corps’ program pre-dates the...adheres to its institutional personality against minimalist Joint FAO Program requirements. Before delving into the cases
ERIC Educational Resources Information Center
Levin, Marjorie; Moss, Marc; Swartz, Janet; Khan, Sherry; Tarr, Hope
The tribal Even Start program is one of the set-aside components of the U.S. Department of Education's Even Start Family Literacy Program. Even Start combines adult literacy, early childhood education, and parenting education services for parents eligible for adult education and their children from birth to age 7. In 1994-95, nine Indian tribes…
Apprenticeship Learning for Robotic Control
2015-10-09
Lawton Reporting Period: 2012/7/1 – 2015/6/30 Abstract: Our...portfolio. Ultimately Dr. James Lawton became the new program officer, and still currently is...James Lawton Reporting Period Start Date 07/01/2012 Reporting Period End Date 06/30/2015 Abstract Our research had three main thrusts:
Annual Progress Report Fiscal Year 1982.
1982-09-30
255 Work Jnit No. 82/43 (FY82,O) A\\dolescent Immunity to Varicella and Cytomegalovirus .............. 256 Work Unit No. 82/45 (FY82,O) V!1-26 In...with technetium-99m bone agent(Infarct avid) radiopharmaceuticals. Presented at the New Mexico Society of Internal Medicine, Albuquerque NM, 11-12 Dec...No: 82/43 Status: Ongoing Title: Adolescent Immunity to Varicella and Cytomegalovirus Start Date: Est Comp Date: Principal Investigator: Facility: LTC
1986-06-01
63’ Reference Date Tinx- Point Elevation: Drilling Started:11/8/84 1330hrs Drillinz Cornpleted:11/12/84 1100 Site Sketch Waer Leel: 13.5’ 11/9/84 0900...Box 1401 TELEPHONE (302) 736 4761I DOVER. DELAWARE 1 9903 I MEMORANDUM 3 TO: Mr. Kevin Burdette FROM: Philip J. Cherry’j DATE: October 22, 1984 The
Clinical Investigation Program
1990-09-30
with Subretinal Hemorrhage: A Case Report. Ann Ophthalmol, 22:259-262, 1990. Walton WT, Enzenauer RW: " Nutritional Disease" in Levin AV, Enzenauer RW...adequate means of maintaining nutritional status. Publications and Presentations: None. 1 135 FAMC A.P.R. (RCS MED 300) Detail Summary Sheet (HSCR 40-23 as...4) Title: The Effect of Liposucticn on Myocutaneous Flaps in the Yucatan Micro Pig (5) Start Date: (6) Est Compl Date: (7) Principal Investigator: (8
Annual Research Progress Report, Fiscal Year 1981,
1981-10-01
Joseph P. Murgo, M.D., COL, MC Key Words: Patent ductus arteriosus Cyanotic congenital heart disease Accumulative MEDCASE Est Accumulative Periodic Cost... Ductus Arteriosus in Neonates 47 with Cyanotic Congenital Heart Disease. (T) C-37-79 Ankle Trauma Study. (0) 48 C-5-80 Lopressor Intervention Trial. (0...Maintenance of Patency of the Ductus Arteriosus in Neonates with Cyanotic Congenital Heart Disease Start Date: Aug 79 Est Comp Date: Principal
NASA Astrophysics Data System (ADS)
Mariano, S.; di Toro, G.; Collettini, C.; Usems Team; Glass Team
2011-12-01
USEMS and GLASS are two projects financed by the European Research Council (ERC) as part of the ERC starting grants scheme within the FP7 framework. The rationale behind the funding scheme is to support some of the most promising scientific endeavours in Europe that are being led by young researchers, and to emphasize the excellence of individual ideas rather than specific research areas; in other words, to promote bottom-up frontier research. The general benefits of this rationale are evident in the two ongoing projects that deal with earthquake physics, as these projects are increasingly recognized in their scientific community. We can say that putting excellence at the heart of European Research strongly contributes to the construction of a European knowledge-based society. From a researcher point-of-view one of the most challenging aspects of these projects is to approach and convey the results of the projects to a general public, contributing to the construction of knowledge-based society. Luckily, media interest and the availability of a number of new communication tools facilitate the outreach of scientific achievements. The largest earthquakes during the last ten years (e.g. Sumatra 2004 and Japan 2011) have received widespread attention in the media world (TV, W.W.W., Newspaper and so on) for months, and successful research projects such as those above also become media protagonists, gaining their space in the media bullring. The USEMS principal investigator and his team have participated in several dissemination events in the Mass Media, such as interviews wit Italian and French TV national broadcasts (RAI Due TG2, RAI Uno Unomattina, Rai Tre Geo & Geo, FRANCE 2); interviews in scientific journals: SCIENCE (Sept. 2010), newspapers and web (Corriere della Sera, Il Gazzettino, Il Messagero, La Stampa, Libero, Il Mattino, Yahoo, ANSA, AdnKronos and AGI); radio (RadioRai Uno, RadioRai Tre Scienza); documentary "Die Eroberung der Alpen" produced by Tangram Film (Munchen, Germany). The USEMS project started in June 2008, and the GLASS project in October 2010. For both projects we developed a number of web pages through the official web site of the host institution, the National Institute of Geophysics and Volcanology (INGV) in Rome. In these pages we describe the projects, publish pictures and short-movies of the experimental activities and keep the project results up to date. In addition the research teams collaborate within various INGV outreach schemes (school and student visits in the laboratory, writing short news reports for the INGV press office, and interviews with journalists) as well as using WWW channels (Facebook, Youtube) to make the project results available to the general public. Finally, it is notable that the ERC funding agency itself is fully involved in the outreach activities using its own communication channels and its highly skilled resources which promote through brochures, web pages, publications and documentaries the best projects. We are going to improve our effort in this direction up to the end of the projects.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-03
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9220-3] Notice of a Project Waiver of Section 1605: (Buy... American requirements of ARRA Section 1605 under the authority of Section 1605(b)(2) (manufactured goods... decision to make an exception under section 1605(b)(2) of ARRA. DATES: Effective Date: August 13, 2010. FOR...
ERIC Educational Resources Information Center
Stephens, Lillian
1981-01-01
Presented are methods to help teachers continue the environmental awareness programs they have already started by providing up-to-date information and activities dealing with air pollution, water pollution, and solid waste disposal. (Author/KC)
... weeks. Then you can start enjoying your pierced ears again! Reviewed by: Steven Dowshen, MD Date reviewed: September ... All information on KidsHealth® is for educational purposes only. For specific medical advice, diagnoses, and treatment, ...
ALARA and decommissioning: The Fort St. Vrain experience
DOE Office of Scientific and Technical Information (OSTI.GOV)
Borst, T.; Niehoff, M.; Zachary, M.
1995-03-01
The Fort St. Vrain Nuclear Generating Station, the first and only commercial High Temperature Gas Cooled Reactor to operate in the United States, completed initial fuel loading in late 1973 and initial startup in early 1974. Due to a series of non-nuclear technical problems, Fort St. Vrain never operated consistently, attaining a lifetime capacity factor of slightly less than 15%. In August of 1989, the decision was made to permanently shut down the plant due to control rod drive and steam generator ring header failures. Public Service Company of Colorado elected to proceed with early dismantlement (DECON) as opposed tomore » SAFSTOR on the bases of perceived societal benefits, rad waste, and exposure considerations, regulatory uncertainties associated with SAFSTOR, and cost. The decommissioning of Fort St. Vrain began in August of 1992, and is scheduled to be completed in early 1996. Decommissioning is being conducted by a team consisting of Westinghouse, MK-Ferguson, and Scientific Ecology Group. Public Service Company of Colorado as the licensee provides contract management and oversight of contractor functions. An aggressive program to maintain project radiation exposures As Low As Reasonably Achievable (ALARA) has been established, with the following program elements: temporary and permanent shielding contamination control; mockup training; engineering controls; worker awareness; integrated work package reviews communication; special instrumentation; video camera usage; robotics application; and project committees. To date, worker exposures have been less than project estimates. from the start of the project through Februrary of 1994, total exposure has been 98.666 person-rem, compared to the project estimate of 433 person-rem and goal of 347 person-rem. The presentation will discuss the site characterization efforts, the radiological performance indicator program, and the final site release survey plans.« less
Technical Assistance Program: Off to a Running Start (Newsletter)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This newsletter describes key activities of the DOE Office of Indian Energy Policy and Programs for Winter 2012. Between December 2, 2011, and January 15, 2012, 46 American Indian and Alaska Native Tribes submitted applications to receive technical assistance through the program, which provides Tribes with on-the-ground technical support from DOE and National Renewable Energy Laboratory (NREL) staff to help move tribal energy efficiency and renewable energy projects forward. The applications are being considered through the Strategic Technical Assistance Response Team (START) selection process, which incorporates expert reviews and outreach to Tribes who present a need for assistance with theirmore » community-based energy efficiency and renewable energy projects. The final successful applicants will be selected based on the clarity of their requests for technical assistance and the ability of START to successfully work with each unique project or community. At least three selected Tribes in Alaska will receive technical assistance between March and May 2012, and up to five selected Tribes in the contiguous United States will receive technical assistance between March and August 2012. During the months of START Program activity, DOE and NREL experts will work in the two locations. In Alaska, START experts will work directly with community-based project teams to analyze local energy issues and provide assistance with energy projects and cost savings initiatives. This effort will be bolstered by DOE-IE's partnership with the Denali Commission, which will provide further assistance and expertise. In the lower 48 states, NREL experts will work with the selected renewable energy START projects to evaluate financial and technical feasibility and provide early development technical assistance to better position the projects for financing and construction. This on-the-ground technical assistance is part of a broader DOE-IE effort to make reliable, accurate technical information and skills-based training available to tribal communities throughout the United States. The primary goal of the START initiative, according to DOE-IE Director Tracey A. LeBeau, is to bring about the next generation of energy development in Indian Country. Through energy project planning, quality training, and technical assistance, The START program will leverage the early-stage resource characterization and pre-feasibility investments that DOE has made in Indian Country over the years, and unlock the energy resources that exist on tribal lands to help build a 21st century tribal energy economy. Working collaboratively with a select group of Tribes and Alaska Native entities, the DOE Office of Indian Energy, NREL, and the Denali Commission will empower tribal leaders to make informed energy decisions and help build capacity to bring tribal energy visions to fruition and get renewable energy projects off the ground, said LeBeau. Ultimately, these efforts will serve to further the Obama Administration and DOE's shared commitment to provide Native American and Alaska Native communities with the tools and resources they need to foster tribal energy self-sufficiency and sustainability, advancing job creation and enhancing economic competitiveness.« less
... Navigation Bar Home Current Issue Past Issues The Alzheimer's Project Past Issues / Spring 2009 Table of Contents ... of this page please turn Javascript on. The Alzheimer's Project A 4-Part Documentary Series Starting May ...
MOLA II Laser Transmitter Calibration and Performance. 1.2
NASA Technical Reports Server (NTRS)
Afzal, Robert S.; Smith, David E. (Technical Monitor)
1997-01-01
The goal of the document is to explain the algorithm for determining the laser output energy from the telemetry data within the return packets from MOLA II. A simple algorithm is developed to convert the raw start detector data into laser energy, measured in millijoules. This conversion is dependent on three variables, start detector counts, array heat sink temperature and start detector temperature. All these values are contained within the return packets. The conversion is applied to the GSFC Thermal Vacuum data as well as the in-space data to date and shows good correlation.
Sugar beet growth in a changing climate: past, present and future trends in southwest Germany
NASA Astrophysics Data System (ADS)
Kremer, Pascal; Fuchs, Hans-Joachim; Lang, Christian
2017-04-01
In the study, single factors and their impact on sugar beet cultivation against the background of past and projected climate change are being analyzed. The database consists of climate data by the German Weather Service and 1x1 km interpolated INTERMET raster data. Impact models were run to assess possible future trends using climate projection data of the REgional MOdel (REMO), emission scenario A1B, Run 1, data stream 2 for Germany, daily resolution, without bias correction, 10x10 km raster (n=150) (MPI on behalf of UBA 2006). Compared periods were: B:1971 2000; K:2021-2050; L:2071-2100. Agronomic data were collected from the field books of regional trials from 1974 2014 (n=448). Moreover, a business survey of regional farmers was carried out and evaluated. Impact models to predict timing for sowing, the date of field emergence and row closure, were derived from these data. The ontogenesis was simulated using a linear, temperature-based leaf-growth model. Sowing shifted forward by 7,3 days in regional field trials from 1974 2014. Progress-oriented, risk-tolerant farmers start sowing 10-14 days earlier compared to 1980. Recently, sowing is being conducted on average on 21 March in southwest Germany. For period K, 17 March, and for period L, 2 March is being projected as the average future sowing date while the same late frost risk applies compared to present climatic conditions. Shifting forward the sowing date with spring warming and, thus, exploiting the associated yield potential is the most promising agronomic adaptation strategy to the projected climate change on the farm level. In connection to earlier sowing, the field emergence tendentially shifted forward by 14 days in the field trials. Assuming sowing on 15 March, projection results show an advance of field emergence form 7 April in period B to 3 April in period L. Row closure in field trials in average shifted forward by 19,6 days. For period L, 29 May and thus, an earlier row closure of 9 days compared to K, is being projected. In period L, 20-leaf-stage is being projected 7,8 days, and 40-leaf-stage 11,2 days earlier compared to period K. All previously mentioned trends positively influence the yield potential of sugar beets due to the increasing use efficiency of photosynthetically active radiation. Running a correlation analysis, the height of the yield variance reconnaissance ratio of the main weather-related growth factors, temperature and precipitation, was determined. During the main growth phase from June-September, the precipitation sum explains 76%, the daily average temperature sum from April-October in the range of 3°C-19°C explains 64% of the yield variance of Mainz from 1991-2012. For both parameters, a decrease is being projected for the second half of the 21st century, which would influence the regional yield potential negatively. Summarizing, climate change had positive as well as negative impacts on regional sugar beet cultivation. Based on the REMO data, past trends continue prospectively. Due to that, it is important to fully use positive effects for yield formation. Furthermore, adaption to negative climatic changes and research are crucial to guarantee a high-yielding, sustainable sugar beet growth in future.
NASA Astrophysics Data System (ADS)
Cornejo, A.
2011-04-01
The field of Optics in Mexico, related with research projects, started at the Instituto de Astronomía, UNAM, since 1960. Therefore, the first projects and papers were mainly dedicated to astronomical instruments. After sometime, other projects started other areas of Optics as for example the production of He-Ne gas lasers, thin films deposits, experiments in holography, programs for general optical design, and theory and experiments for testing optical components and instruments.
ERIC Educational Resources Information Center
Landerholm, Elizabeth
McCosh Even Start is a federally funded project at McCosh School in an inner-city Chicago neighborhood and is administered as a partnership between Northeastern Illinois University and the Chicago Public Schools. The program's goals are to help parents: (1) become involved with the school by becoming comfortable at the school, making friends, and…
ERIC Educational Resources Information Center
Dorman, Lynn M.
Ten boys and 16 girls from two Head Start schools in Massachusetts were administered two projective measures of aggression. A third measure was obtained from teacher rankings of behavior based on classroom conduct. For the projective measures, each child was asked to respond to three social situations as depicted by dolls and drawings. The child…
ERIC Educational Resources Information Center
Hanson, Lori, Comp.; Deere, David, Comp.; Lee, Carol Amundson, Comp.; Lewin, Amy, Comp.; Seval, Carolyn, Comp.
This paper describes the Starting Early Starting Smart (SESS) project, an early intervention program that has been developed in the context of the national, multi-site program and evaluation. The emphasis in SESS is on the integration of behavioral health services into easily accessible, non-threatening settings where caregivers naturally and…
REPORT OF THE EFFECTIVENESS OF PROJECT HEAD START, LUBBOCK, TEXAS. PARTS I, II, AND APPENDICES.
ERIC Educational Resources Information Center
CARTWRIGHT, WALTER J.; STEGLICH, W.G.
WITH THE COMPLETION OF THE FIRST GRADE BY THE FIRST HEAD START CLASS IN LUBBOCK, TEXAS, THIS STUDY WAS UNDERTAKEN TO PRESENT DATA ON THE EFFECTIVENESS OF THE HEAD START PROGRAM IN IMPROVING DISADVANTAGED CHILDREN'S CHANCES FOR SCHOOL SUCCESS. TWO HUNDRED AND NINETY-FIVE URBAN AREA HEAD START CHILDREN FROM NEGRO, ANGLO-AMERICAN, AND…
NASA Astrophysics Data System (ADS)
Shabani, Farzin; Kumar, Lalit; Taylor, Subhashni
2014-11-01
This study set out to model potential date palm distribution under current and future climate scenarios using an emission scenario, in conjunction with two different global climate models (GCMs): CSIRO-Mk3.0 (CS), and MIROC-H (MR), and to refine results based on suitability under four nonclimatic parameters. Areas containing suitable physicochemical soil properties and suitable soil taxonomy, together with land slopes of less than 10° and suitable land uses for date palm ( Phoenix dactylifera) were selected as appropriate refining tools to ensure the CLIMEX results were accurate and robust. Results showed that large regions of Iran are projected as likely to become climatically suitable for date palm cultivation based on the projected scenarios for the years 2030, 2050, 2070, and 2100. The study also showed CLIMEX outputs merit refinement by nonclimatic parameters and that the incremental introduction of each additional parameter decreased the disagreement between GCMs. Furthermore, the study indicated that the least amount of disagreement in terms of areas conducive to date palm cultivation resulted from CS and MR GCMs when the locations of suitable physicochemical soil properties and soil taxonomy were used as refinement tools.
Tang, Gong; Kong, Yuan; Chang, Chung-Chou Ho; Kong, Lan; Costantino, Joseph P
2012-01-01
In a phase III multi-center cancer clinical trial or a large public health study, sample size is predetermined to achieve desired power, and study participants are enrolled from tens or hundreds of participating institutions. As the accrual is closing to the target size, the coordinating data center needs to project the accrual closure date on the basis of the observed accrual pattern and notify the participating sites several weeks in advance. In the past, projections were simply based on some crude assessment, and conservative measures were incorporated in order to achieve the target accrual size. This approach often resulted in excessive accrual size and subsequently unnecessary financial burden on the study sponsors. Here we proposed a discrete-time Poisson process-based method to estimate the accrual rate at time of projection and subsequently the trial closure date. To ensure that target size would be reached with high confidence, we also proposed a conservative method for the closure date projection. The proposed method was illustrated through the analysis of the accrual data of the National Surgical Adjuvant Breast and Bowel Project trial B-38. The results showed that application of the proposed method could help to save considerable amount of expenditure in patient management without compromising the accrual goal in multi-center clinical trials. Copyright © 2012 John Wiley & Sons, Ltd.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-01
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No., 13010-002; Project No., 14272-000] Mississippi 8 Hydro, LLC; FFP Project 98, LLC, ; Notice Announcing Filing Priority for.... Mississippi 8 Hydro, LLC--Project No. 13010-002. 2. FFP Project 98, LLC--Project No. 14272-000. Dated: April...
36 CFR 64.9 - Project costs (State and local projects).
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...
36 CFR 64.9 - Project costs (State and local projects).
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...
36 CFR 64.9 - Project costs (State and local projects).
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...
36 CFR 64.9 - Project costs (State and local projects).
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...
Concentrating Solar Power Projects - Godawari Solar Project | Concentrating
Solar Power | NREL Godawari Solar Project This page provides information on Godawari Solar Project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration. Status Date: February 13, 2014 Project Overview Project Name: Godawari Solar
75 FR 24692 - Meeting of the Ozone Transport Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-05
..., architectural industrial and maintenance coatings, consumer products, industrial commercial and institutional... catalysts, lightering, and non- road idling. DATES: The meeting will be held on June 3, 2010 starting at 9 a...
Food Safety: MedlinePlus Health Topic
... reached its expiration date. United States Department of Agriculture Start Here 4 Basic Steps to Food Safety ... Food Safety When Preparing Holiday Meals (Department of Agriculture, Food Safety and Inspection Service) - PDF Also in ...
Code of Federal Regulations, 2010 CFR
2010-07-01
... start-up, whichever date comes first. Each owner or operator shall either: (a) Reduce emissions of TOC (minus methane and ethane) by 98 weight-percent, or to a TOC (minus methane and ethane) concentration of...
40 CFR 52.2320 - Identification of plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... dated February 5, 1985, HAFB AO for Paint Booth, HVAC Modification, Standby Generators, and Fuel Storage... implementation of the inspection of vehicle On-Board Diagnostic (OBD) systems starting January 1, 2002 in all...
40 CFR 52.2320 - Identification of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... dated February 5, 1985, HAFB AO for Paint Booth, HVAC Modification, Standby Generators, and Fuel Storage... implementation of the inspection of vehicle On-Board Diagnostic (OBD) systems starting January 1, 2002 in all...
40 CFR 52.2320 - Identification of plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... dated February 5, 1985, HAFB AO for Paint Booth, HVAC Modification, Standby Generators, and Fuel Storage... implementation of the inspection of vehicle On-Board Diagnostic (OBD) systems starting January 1, 2002 in all...
1. PHOTOCOPY OF RENDERING OF PSFS BUILDING BY D.E. SUTTON. ...
1. PHOTOCOPY OF RENDERING OF PSFS BUILDING BY D.E. SUTTON. Date possibly 1929 or 1930, when construction started. - Philadelphia Saving Fund Society, Twelfth & Market Streets, Philadelphia, Philadelphia County, PA
van Hooidonk, Ruben; Maynard, Jeffrey Allen; Manzello, Derek; Planes, Serge
2014-01-01
Coral reefs and the services they provide are seriously threatened by ocean acidification and climate change impacts like coral bleaching. Here, we present updated global projections for these key threats to coral reefs based on ensembles of IPCC AR5 climate models using the new Representative Concentration Pathway (RCP) experiments. For all tropical reef locations, we project absolute and percentage changes in aragonite saturation state (Ωarag) for the period between 2006 and the onset of annual severe bleaching (thermal stress >8 degree heating weeks); a point at which it is difficult to believe reefs can persist as we know them. Severe annual bleaching is projected to start 10-15 years later at high-latitude reefs than for reefs in low latitudes under RCP8.5. In these 10-15 years, Ωarag keeps declining and thus any benefits for high-latitude reefs of later onset of annual bleaching may be negated by the effects of acidification. There are no long-term refugia from the effects of both acidification and bleaching. Of all reef locations, 90% are projected to experience severe bleaching annually by 2055. Furthermore, 5% declines in calcification are projected for all reef locations by 2034 under RCP8.5, assuming a 15% decline in calcification per unit of Ωarag. Drastic emissions cuts, such as those represented by RCP6.0, result in an average year for the onset of annual severe bleaching that is ~20 years later (2062 vs. 2044). However, global emissions are tracking above the current worst-case scenario devised by the scientific community, as has happened in previous generations of emission scenarios. The projections here for conditions on coral reefs are dire, but provide the most up-to-date assessment of what the changing climate and ocean acidification mean for the persistence of coral reefs. © 2013 John Wiley & Sons Ltd.
A latent transition model of the effects of a teen dating violence prevention initiative.
Williams, Jason; Miller, Shari; Cutbush, Stacey; Gibbs, Deborah; Clinton-Sherrod, Monique; Jones, Sarah
2015-02-01
Patterns of physical and psychological teen dating violence (TDV) perpetration, victimization, and related behaviors were examined with data from the evaluation of the Start Strong: Building Healthy Teen Relationships initiative, a dating violence primary prevention program targeting middle school students. Latent class and latent transition models were used to estimate distinct patterns of TDV and related behaviors of bullying and sexual harassment in seventh grade students at baseline and to estimate transition probabilities from one pattern of behavior to another at the 1-year follow-up. Intervention effects were estimated by conditioning transitions on exposure to Start Strong. Latent class analyses suggested four classes best captured patterns of these interrelated behaviors. Classes were characterized by elevated perpetration and victimization on most behaviors (the multiproblem class), bullying perpetration/victimization and sexual harassment victimization (the bully-harassment victimization class), bullying perpetration/victimization and psychological TDV victimization (bully-psychological victimization), and experience of bully victimization (bully victimization). Latent transition models indicated greater stability of class membership in the comparison group. Intervention students were less likely to transition to the most problematic pattern and more likely to transition to the least problem class. Although Start Strong has not been found to significantly change TDV, alternative evaluation models may find important differences. Latent transition analysis models suggest positive intervention impact, especially for the transitions at the most and the least positive end of the spectrum. Copyright © 2015. Published by Elsevier Inc.
Wu, Yun; Li, Qing-Jun
2017-10-01
Floral traits have largely been attributed to phenotypic selection in plant-pollinator interactions. However, the strength of this link has rarely been ascertained with real pollinators. We conducted pollinator observations and estimated selection through female fitness on flowering phenology and floral traits between two Primula secundiflora populations. We quantified pollinator-mediated selection by subtracting estimates of selection gradients of plants receiving supplemental hand pollination from those of plants receiving open pollination. There was net directional selection for an earlier flowering start date at populations where the dominant pollinators were syrphid flies, and flowering phenology was also subjected to stabilized quadratic selection. However, a later flowering start date was significantly selected at populations where the dominant pollinators were legitimate (normal pollination through the corolla tube entrance) and illegitimate bumblebees (abnormal pollination through nectar robbing hole which located at the corolla tube), and flowering phenology was subjected to disruptive quadratic selection. Wider corolla tube entrance diameter was selected at both populations. Furthermore, the strength of net directional selection on flowering start date and corolla tube entrance diameter was stronger at the population where the dominant pollinators were syrphid flies. Pollinator-mediated selection explained most of the between-population variations in the net directional selection on flowering phenology and corolla tube entrance diameter. Our results suggested the important influence of pollinator-mediated selection on floral evolution. Variations in pollinator assemblages not only resulted in variation in the direction of selection but also the strength of selection on floral traits.
Successful Hazwaste Program Halts Annual State Inspection
2011-05-01
ES) Red River Army Depot ,100 James Carlow Drive, Texarkana ,TX,75507-5000 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY...MAIN DRIVE. TEXARKANA . lX 75507 ~5000103 334~3333 Accumulation Start Date ** Cert1fied F1ll Date. WC$0oocr- IIFiol ----= CUSTOMIZE YOUR OWN...MARKING/LABELING TO COMPLY BE AMERICA’S BEST Con tamer: *RRA0023678* RRAD023678 Hazardous Waste RED RIVER ARMY DEPOT 100 MAIN DRIVE TEXARKANA , 1X
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-24
... January 12, 1891, as amended by the Act of Congress dated March 1, 1907, to facilitate the issuance of a.... DATES: Effective Date: June 24, 2010. FOR FURTHER INFORMATION CONTACT: Duane Marti, Realty Specialist... amended by the Act of Congress dated March 1, 1907 (34 Stat. 1015, 1022), to facilitate the issuance of...
Extended Storage of Pathogen-Reduced Platelet Concentrates (PRECON)
2016-10-01
J. Slichter, MD CONTRACTING ORGANIZATION: Bloodworks Northwest Seattle, WA 98104 REPORT DATE : October 2016 TYPE OF REPORT: Annual Report...NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE October 2016 2. REPORT TYPE Annual 3. DATES COVERED 26-SEP-15 to 25-SEP-16 4. TITLE AND...Platelet Concentrates (PRECON) dated 7/21/14 • Protocol - Cold Apheresis Platelets in Isoplate (CAPI) • Quad Chart 10 Date : 07-21-2014 Project Title
50 CFR 217.201 - Effective dates.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 50 Wildlife and Fisheries 9 2011-10-01 2011-10-01 false Effective dates. 217.201 Section 217.201 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION... Redevelopment Project § 217.201 Effective dates. Regulations in this subpart are effective from July 15, 2009...
Book: Marine Bioacoustic Signal Processing and Analysis
2011-09-30
physicists , and mathematicians . However, more and more biologists and psychologists are starting to use advanced signal processing techniques and...Book: Marine Bioacoustic Signal Processing and Analysis 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT ...chapters than it should be, since the project must be finished by Dec. 31. I have started setting aside 2 hours of uninterrupted per workday to work
Partial oxidation for improved cold starts in alcohol-fueled engines: Phase 2 topical report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-04-01
Alcohol fuels exhibit poor cold-start performance because of their low volatility. Neat alcohol engines become difficult, if not impossible, to start at temperatures close to or below freezing. Improvements in the cold-start performance (both time to start and emissions) are essential to capture the full benefits of alcohols as an alternative transportation fuel. The objective of this project was to develop a neat alcohol partial oxidation (POX) reforming technology to improve an alcohol engine`s ability to start at low temperatures (as low as {minus}30 C) and to reduce its cold-start emissions. The project emphasis was on fuel-grade ethanol (E95) butmore » the technology can be easily extended to other alcohol fuels. Ultimately a compact, on-vehicle, ethanol POX reactor was developed as a fuel system component to produce a hydrogen-rich, fuel-gas mixture for cold starts. The POX reactor is an easily controllable combustion device that allows flexibility during engine startup even in the most extreme conditions. It is a small device that is mounted directly onto the engine intake manifold. The gaseous fuel products (or reformate) from the POX reactor exit the chamber and enter the intake manifold, either replacing or supplementing the standard ethanol fuel consumed during an engine start. The combustion of the reformate during startup can reduce engine start time and tail-pipe emissions.« less
75 FR 50010 - Sunshine Act; Board of Directors Meeting, September 23, 2010
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-16
.... Finance Project--Hungary. 4. Finance Project--Russia. 5. Finance Project--Costa Rica, Honduras and Panama...) 336-8438. Dated: August 12, 2010. Connie M. Downs, Corporate Secretary, Overseas Private Investment...
Code of Federal Regulations, 2010 CFR
2010-10-01
... National Preaward Registry via the Internet at http://www.dol-esa.gov/preaward/; (ii) The projected award date is within 24 months of the proposed contractor's Notice of Compliance completion date in the... the OFCCP regional office at least 30 days before the proposed award date. (7) Within 15 days of the...
42 CFR 456.128 - Initial continued stay review date.
Code of Federal Regulations, 2010 CFR
2010-10-01
... norms to assign the initial continued stay review date, the number of days between the individual's... and criteria required to be described under § 456.129; (2) The individual's condition; and (3) The individual's projected discharge date; (c)(1) The committee uses any available appropriate regional medical...
76 FR 9028 - Training Program for Regulatory Project Managers; Information Available to Industry
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-16
... pharmaceutical companies interested in participating in this program to contact CDER. DATES: Pharmaceutical companies may submit proposed agendas to the Agency by April 18, 2011. FOR FURTHER INFORMATION CONTACT: Beth...-Miller (see DATES and FOR FURTHER INFORMATION CONTACT). Dated: February 9, 2011. Leslie Kux, Acting...
77 FR 10538 - Training Program for Regulatory Project Managers; Information Available to Industry
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-22
... pharmaceutical companies interested in participating in this program to contact CDER. DATES: Pharmaceutical companies may submit proposed agendas to the Agency by April 23, 2012. FOR FURTHER INFORMATION CONTACT: Dan... DATES and FOR FURTHER INFORMATION CONTACT). Dated: February 14, 2012. Leslie Kux, Acting Assistant...
Concentrating Solar Power Projects - Hami 50 MW CSP Project | Concentrating
Solar Power | NREL Hami 50 MW CSP Project Status Date: April 6, 2018 Project Overview Project MW Status: Under construction Do you have more information, corrections, or comments? Background Technology: Power tower Status: Under construction Country: China City: Hami Region: Xinjiang Autonomous
76 FR 29191 - Lawrence County Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
... project proposals and will be soliciting for additional projects. The purpose of the meeting is to review submitted projects and vote on project proposals to recommend for funding. DATES: The meeting will be held... be conducted: Review proposed projects. If Committee members have enough information, they may choose...
22 CFR 62.75 - Extension of program participation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... participant (and the accompanying spouse and any dependents as a “continuing exchange visitor”. In creating...) When creating a SEVIS record for a “continuing exchange visitor,” the initial program start date and...
Visiting Scholars Program Selection | FNLCR Staging
The Expression of Interest will provide us with the applicant’s: Personal and professional information Targeted start and end dates Purpose of the visit in the context of his/her overall research activities Research approach to ad
... nicotine than cigarettes. Nicotine is a highly addictive drug that makes it hard to stop using tobacco once you start. Having a quit date and a quitting plan can help you stop successfully. NIH: National Institute of Dental and Craniofacial Research
Rebuilding the City on the Hill
2012-03-22
authorized “enhanced interrogation” techniques widely perceived as torture by many Americans. Following an abuse scandal at the Abu Ghraib prison in Iraq...1. REPORT DATE (DD-MM-YYYY) 22-03-2012 2. REPORT TYPE Strategy Research Project 3. DATES COVERED (From - To) OCT 2011 – FEB 2012 4. TITLE AND...code) Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std. Z39.18 USAWC STRATEGY RESEARCH PROJECT REBUILDING THE CITY ON
Artifacts in Radar Imaging of Moving Targets
2012-09-01
CA, USA, 2007. [11] B. Borden, Radar imaging of airborne targets: A primer for Applied mathematicians and Physicists . New York, NY: Taylor and... Project (0704–0188) Washington DC 20503. 1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE 21 September 2012 3. REPORT TYPE AND DATES COVERED...CW Continuous Wave DAC Digital to Analog Convertor DFT Discrete Fourier Transform FBP Filtered Back Projection FFT Fast Fourier Transform GPS
Maintenance Production Demand and Capacity Analysis of Third Maintenance Battalion
2017-12-01
Materiel Logistics Support Management curriculum, the scope of this project was necessarily constricted. As such, this report does not include a study...Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction... Project (0704-0188) Washington, DC 20503. 1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE December 2017 3. REPORT TYPE AND DATES COVERED MBA
NASA: Assessments of Selected Large-Scale Projects
2011-03-01
REPORT DATE MAR 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE Assessments Of Selected Large-Scale Projects...Volatile EvolutioN MEP Mars Exploration Program MIB Mishap Investigation Board MMRTG Multi Mission Radioisotope Thermoelectric Generator MMS Magnetospheric...probes designed to explore the Martian surface, to satellites equipped with advanced sensors to study the earth , to telescopes intended to explore the
Immigration Adjudication Reform: The Case for Automation
2014-09-01
example , TSA’s fiscal year 2012 budget request proposed funding to deploy a pilot project related to screening against the additional TSDB records.144...Reduction Project (0704-0188) Washington, DC 20503. 1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE September 2014 3. REPORT TYPE AND DATES COVERED...external factors that may affect Agency workload or procedures. For example , the Agency redesigned the N-400 “Application for Naturalization.” Prior to
Sequencing, Analysis, and Annotation of Expressed Sequence Tags for Camelus dromedarius
Al-Swailem, Abdulaziz M.; Shehata, Maher M.; Abu-Duhier, Faisel M.; Al-Yamani, Essam J.; Al-Busadah, Khalid A.; Al-Arawi, Mohammed S.; Al-Khider, Ali Y.; Al-Muhaimeed, Abdullah N.; Al-Qahtani, Fahad H.; Manee, Manee M.; Al-Shomrani, Badr M.; Al-Qhtani, Saad M.; Al-Harthi, Amer S.; Akdemir, Kadir C.; Otu, Hasan H.
2010-01-01
Despite its economical, cultural, and biological importance, there has not been a large scale sequencing project to date for Camelus dromedarius. With the goal of sequencing complete DNA of the organism, we first established and sequenced camel EST libraries, generating 70,272 reads. Following trimming, chimera check, repeat masking, cluster and assembly, we obtained 23,602 putative gene sequences, out of which over 4,500 potentially novel or fast evolving gene sequences do not carry any homology to other available genomes. Functional annotation of sequences with similarities in nucleotide and protein databases has been obtained using Gene Ontology classification. Comparison to available full length cDNA sequences and Open Reading Frame (ORF) analysis of camel sequences that exhibit homology to known genes show more than 80% of the contigs with an ORF>300 bp and ∼40% hits extending to the start codons of full length cDNAs suggesting successful characterization of camel genes. Similarity analyses are done separately for different organisms including human, mouse, bovine, and rat. Accompanying web portal, CAGBASE (http://camel.kacst.edu.sa/), hosts a relational database containing annotated EST sequences and analysis tools with possibility to add sequences from public domain. We anticipate our results to provide a home base for genomic studies of camel and other comparative studies enabling a starting point for whole genome sequencing of the organism. PMID:20502665
Use of target-date funds in 401(k) plans, 2007.
Copeland, Craig
2009-03-01
WHAT THEY ARE: Target-date funds (also called "life-cycle" funds) are a type of mutual fund that automatically rebalances its asset allocation following a predetermined pattern over time. They typically rebalance to more conservative and income-producing assets as the participant's target date of retirement approaches. WHY THEY'RE IMPORTANT AND GROWING: Of the 401(k) plan participants in the EBRI/ICI 401(k) database who were found to be in plans that offeredtarget-date funds, 37 percent had at least some fraction of their account in target-date funds in 2007. Target-date funds held about 7 percent of total assets in 401(k) plans and the use of these funds is expected to increase in the future. The Pension Protection Act of 2006 made it easier for plan sponsors to automatically enroll new workers in a 401(k) plan, and target-date funds were one of the types of approved funds specified for a "default" investment if the participant does not elect a choice. BRI/ICI 401(K) DATABASE: This study uses the unique richness of the data in the EBRI/ICI Participant-Directed Retirement Plan Data Collection Project, which has almost 22 million participants, to examine the choices and characteristics of participants whose plans offer target-date funds. EFFECT OF AGE, SALARY, JOB TENURE, AND ACCOUNT BALANCE: Younger workers are significantly more likely to invest in target-date funds than are older workers: Almost 44 percent of participants under age 30 had assets in a target-date fund, compared with 27 percent of those 60 or older. Target-date funds appeal to those with lower incomes, little time on the job, and with few assets. On average, target-date fund investors are about 2.5 years younger than those who do not invest in target-date funds, have about 3.5 years less tenure, make about $11,000 less in salary, have $25,000 less in their account, and are in smaller plans. EFFECT OF AUTOMATIC ENROLLMENT: While the EBRI/ICI database does not contain specific information on whether a 401(k) plan had automatic enrollment, this analysis was able to proxy for those who could be identified as automatically enrolled. The data show that workers who were considered to be automatically enrolled in their employer's 401(k) plan are significantly more likely to invest all their assets in a target-date fund than those who voluntarily joined, and were also less likely to have extreme all-or-nothing asset allocations to equities. EQUITY ALLOCATIONS AND FUND FAMILIES: One of the major questions surrounding target-date funds is the equity allocations that these funds use over time (the so-called "glide path") as a participant's retirement target date approaches. The glide paths of different target-date funds have significantly different shapes and starting/ending equity allocations. As of 2007, the equity allocation ranges from about 80-90 percent for 2040 funds (for workers about 30 years away from retirement), and from 26-66 percent for 2010 funds (for workers one year away from retirement)--a 40 percentage-point difference. Moreover, the fund families change their relative rank in equity allocation within the different fund years. This analysis finds that the relative rank of the equity allocation within a target-date fund does not appear to affect the percentage of participants investing all their account into that fund. Nevertheless, investors in specific fund families are more likely to invest all their assets in a single target-date fund from that family.
Outstanding challenges limiting the development of climate services in Europe
NASA Astrophysics Data System (ADS)
Buontempo, Carlo; Soares, Marta Bruno; Liggins, Felicity
2016-04-01
Climate services attempt to make the available (or forthcoming) climate knowledge more usable by decision and policy makers in the development of a climate smart society. Since the launch of the Global Framework for Climate Services in 2009 there has been an exponential increase in investment in the development and delivery of climate services, leading to an array of projects and initiatives across Europe. However, to date little attention has been given to understanding the different ways in which climate services are defined, implemented, and evaluated in Europe. In addition, other aspects such as how to pursue the necessary processes of co-production, which business models to apply, and the implications for the careers of scientists and others involved in the development of climate services are also crucial elements that need to be further examined and discussed. Such aspects are critical to the future development of climate services as they have the potential to significantly constrain the growth of climate services in Europe. Starting from a set of questions that have arisen within some of the most prominent climate services projects and initiatives in Europe, our paper highlights and expands on the outstanding challenges that need to be resolved by both the scientific community and the funders in order to ensure climate services can prosper and grow in Europe.
Timmer, Susan G; Urquiza, Anthony J; Boys, Deanna K; Forte, Lindsay A; Quick-Abdullah, Daphne; Chan, Sam; Gould, William
2016-03-01
In October 2012, first 5 LA funded a unique collaboration between Los Angeles County Department of Mental Health (DMH) and UC Davis PCIT Training Center (UCD PCIT) to train county-contracted agencies to provide Parent-Child Interaction Therapy (PCIT). This $20 million dollar, 5-year grant represented the largest implementation effort of an empirically based treatment to date. The purpose of this paper was to describe the first 2 years of the implementation process of this project, beginning with project start up and pre-implementation phases, and to present agency training and client performance outcomes from our first year of training. Results presented in this evaluation suggest that it is possible to train LA County providers in PCIT, and that PCIT is an effective intervention for DMH-contracted providers in LA County. This evaluation also discusses challenges to successful implementation. Barriers to progress included unanticipated delays building county infrastructure, trainee attrition, and insufficient client referrals. We discuss the results of the current implementation with respect to theory, research, and others' training models, with the aim of evaluating and prioritizing different implementation drivers, noting the ongoing competition between knowing what to do and the need for action. Copyright © 2015 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gordon Tibbitts; Arnis Judzis
2001-10-01
This document details the progress to date on the OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE -- A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING contract for the quarter starting July 2001 through September 2001. Accomplishments to date include the following: TerraTek highlighted DOE's National Energy Technology Laboratory effort on Mud Hammer Optimization at the recent Annual Conference and Exhibition for the Society of Petroleum Engineers. The original exhibit scheduled by NETL was canceled due to events surrounding the September tragedies in the US. TerraTek has completed analysis of drilling performance (rates of penetration, hydraulics, etc.) for themore » Phase One testing which was completed at the beginning of July. TerraTek jointly with the Industry Advisory Board for this project and DOE/NETL conducted a lessons learned meeting to transfer technology vital for the next series of performance tests. Both hammer suppliers benefited from the testing program and are committed to pursue equipment improvements and ''optimization'' in accordance with the scope of work. An abstract for a proposed publication by the society of Petroleum Engineers/International Association of Drilling Contractors jointly sponsored Drilling Conference was accepted as an alternate paper. Technology transfer is encouraged by the DOE in this program, thus plans are underway to prepare the paper for this prestigious venue.« less
Overview of the Integrated Programs for Aerospace Vehicle Design (IPAD) project
NASA Technical Reports Server (NTRS)
Venneri, S. L.
1983-01-01
To respond to national needs for improved productivity in engineering design and manufacturing, a NASA supported joint industry/government project is underway denoted Integrated Programs for Aerospace Vehicle Design (IPAD). The objective is to improve engineering productivity through better use of computer technology. It focuses on development of data base management technology and associated software for integrated company wide management of engineering and manufacturing information. Results to date on the IPAD project include an in depth documentation of a representative design process for a large engineering project, the definition and design of computer aided design software needed to support that process, and the release of prototype software to manage engineering information. This paper provides an overview of the IPAD project and summarizes progress to date and future plans.
7 CFR 1942.122 - Actions prior to loan closing and start of construction.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 13 2010-01-01 2009-01-01 true Actions prior to loan closing and start of...) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE... Rescue and Other Small Community Facilities Projects § 1942.122 Actions prior to loan closing and start...
Working with a Head Start Population with Asthma: Lessons Learned
ERIC Educational Resources Information Center
Nelson, Belinda W.; Clark, Noreen M.; Valerio, Melissa A.; Houle, Christy R.; Brown, Randall W.; Brown, Clive
2006-01-01
The Early Childhood Asthma Project involved asthma case identification in 35 Head Start centers in Detroit, MI, and attempted implementation of an intervention designed to help families manage a child's asthma more effectively. Surveys were distributed to the parents of all Head Start children (3408), and 2198 complete surveys were returned. Case…
Involvement of Black Fathers in Head Start. Final Report 1987.
ERIC Educational Resources Information Center
Gary, Lawrence E.; And Others
This report evaluates the implementation of a demonstration model of a father-involvement component of Head Start programs in Washington (District of Columbia). Since well over 90 percent of the children in area Head Start programs are Black, the target group for this project was Black fathers. The following recommendations for program improvement…
Annual Research Progress Report Fiscal Year 1987. Volume 1,
1987-10-01
Constrictive Pericarditis 86 in Patients. (0) C-20-85 Pressure Waveforms and Reflections in the Human Aorta: Compari- 87 son of a Cadaver Model with In...in Constrictive 125 Pericarditis . (0) C-60-86 The Natural History of HTLV-III Infection and Disease in a 126 United States Military Population. (0...Sheet Date: 18 Mar 87 Proj No: C-16-85 Status: Terminated Title: Significance of Post Radiotherapy Constrictive Pericarditis in Patients. Start Date 21
Influence of air temperature on the first flowering date of Prunus yedoensis Matsum
Shi, Peijian; Chen, Zhenghong; Yang, Qingpei; Harris, Marvin K; Xiao, Mei
2014-01-01
Climate change is expected to have a significant effect on the first flowering date (FFD) in plants flowering in early spring. Prunus yedoensis Matsum is a good model plant for analyzing this effect. In this study, we used a degree day model to analyze the effect of air temperatures on the FFDs of P. yedoensis at Wuhan University from a long-time series from 1951 to 2012. First, the starting date (=7 February) is determined according to the lowest correlation coefficient between the FFD and the daily average accumulated degree days (ADD). Second, the base temperature (=−1.2°C) is determined according to the lowest root mean square error (RMSE) between the observed and predicted FFDs based on the mean of 62-year ADDs. Finally, based on this combination of starting date and base temperature, the daily average ADD of every year was calculated. Performing a linear fit of the daily average ADD to year, we find that there is an increasing trend that indicates climate warming from a biological climatic indicator. In addition, we find that the minimum annual temperature also has a significant effect on the FFD of P. yedoensis using the generalized additive model. This study provides a method for analyzing the climate change on the FFD in plants' flowering in early spring. PMID:24558585
Starting a hospital-based home health agency: Part II--Key success factors.
Montgomery, P
1993-09-01
In Part II of a three-part series, the financial, technological and legislative issues of a hospital-based home health-agency are discussed. Beginning a home healthcare service requires intensive research to answer key environmental and operational questions--need, competition, financial projections, initial start-up costs and the impact of delayed depreciation. Assessments involving technology, staffing, legislative and regulatory issues can help project service volume, productivity and cost-control.
Contract for Manpower and Personnel Research and Studies II (COMPRS-II) Annual Report - Year Four
2002-10-01
Wonderlic and the Prueba de Aptitud Academica (PAA) will be evaluated in the pilot "Foreign Language Recruiting Initiative" project. Starting in October...Spanish Wonderlic and the Prueba de Aptitud Academica (PAA) will be evaluated in the pilot "Foreign Language Recruiting Initiative" project. Starting...implemented by linear programming software , which optimizes the Army’s enlisted personnel classification system, while accounting for realistic
ERIC Educational Resources Information Center
Jones, Stephanie M.; Zhai, Fuhua; Raver, C. Cybele
2010-01-01
This paper investigates the long-term impact of participation in the Chicago School Readiness Project (CSRP) during the Head Start year on children's behavioral outcomes at the end of their Kindergarten year. The primary questions addressed in the paper are: (1) What is the experimental impact of CSRP on two-year change (from Fall Head Start to…
Technology Infusion Strategy: Beginning with a Pilot Project is the Key.
ERIC Educational Resources Information Center
Ball, John
1996-01-01
Presents an effective way to start a technological revolution in schools by beginning with a single exciting project that incorporates new technologies and then letting interest in the project prompt others to action. (JRH)
Hadron Cancer Therapy - relative merits of X-ray, proton and carbon beams
NASA Astrophysics Data System (ADS)
Jakel, Oliver
2014-03-01
-Heidelberg University has a long experience in radiotherapy with carbon ions, starting with a pilot project at GSI in 1997. This project was jointly run by the Dep. for Radiation Oncology of Heidelberg University, GSI and the German Cancer Research Center (DKFZ). A hospital based heavy ion center at Heidelberg University, the Heidelberg Ion Beam Therapy Center (HIT) was proposed by the same group in 1998 and started clinical operation in late 2009. Since then nearly 2000 patients were treated with beams of carbon ions and protons. Just recently the operation of the world's first and only gantry for heavy ions also started at HIT. Patient treatments are performed in three rooms. Besides that, a lot of research projects are run in the field of Medical Physics and Radiobiology using a dedicated experimental area and the possibility to use beams of protons, carbon, helium and oxygen ions being delivered with the raster scanning technique.
Reconstructing ancient sustainability: a comparison of onsite and offsite data
NASA Astrophysics Data System (ADS)
Lubos, Carolin; Dreibrodt, Stefan; Horejs, Barbara
2013-04-01
With the onset of sedentism humans started to convert their surroundings. Whereas reconstructions of geochemical traces of settlement activity (e.g. Arrhenius, 1931) or man's pressure on the soils of landscapes (e.g. van Andel et al., 1990; Bork, 1998) were carried out at many sites holistic approaches questioning the sustainability of ancient societies are missing so far. A new approach, applied to the multi layered settlement mound "Cukurici Höyük" (western Anatolia, Turkey) aims at comparing land use intensity and settlement intensity. Land use intensity of the former settlers will be described by determining slope instability phases and quantifying slope deposits at hills adjacent to the settlement. Geochemical and physical properties as well as bio remains will be analysed of the dated debris layers onsite and quantified as matter fluxes. Matter accumulation onsite, being an indicator for settlement intensities, is compared to slope instability phases offsite, describing the impact of former settlers on their environment. The approach aims at quantifying historical settlement pressure over several settlement phases and might shed light on different phases of sustainability in ancient Times. The planned project is imbedded within the archaeological project (ERC Project / Austrian Archaeological Institute) which investigates alternating societal systems in a changing environment between 7000 and 3000 BC. Focus is laid on architectural research, archaeobotany, archaeozoology, lithics, metallurgy, and ore deposit. In a first geoarchaeological field campaign differentiable slope deposits could be proved. These contained datable organic material as well as pottery sherds dating to different historical phases. A well-established archaeological chronosequence of settlement layers will provide the onsite framework for this new project. The paper presents preliminary results of the outlined approach. Additionally several geochemical methodologies applied to the debris layers will be compared. Ref: van Andel, T.H., Zangger, E., Demitrack, A., 1990. Land Use and Soil Erosion in Prehistoric and Historical Greece. Journal of Field Archaeology, Volume 17, Number 4, pp. 379-396 (18). Arrhenius, O., 1931. Die Bodenanalyse im Dienst der Archäologie. Zeitschrift für Pflanzenernährung, Düngung und Bodenkunde, Teil B10,pp. 427-439. Bork, H.-R., Bork, H., Dalchow, C., Faust, D., Piorr H.-P. und Schatz, T., 1998. Landschaftsentwicklung in Mitteleuropa. Wirkungen des Menschen auf Landschaften. Gotha (Klett-Perthes). 328 p.
NASA Astrophysics Data System (ADS)
Heartley, Jeremy; Whitmore, B. C.; Blair, W. P.; Christian, C. A.; Donaldson, T.; Hammer, D.; Smith, S.; Viana, A.
2014-01-01
The M83 Citizen Science Project is a collaborative effort currently in development between the Space Telescope Science Institute (STScI) and Zooniverse under the guidance of Dr. Brad Whitmore as part of Cy 19 proposal 12513 (PI - Dr. William Blair). This unique citizen science project will allow users to analyze individual star clusters within The Southern Pinwheel Galaxy, M83. The project will show users color-composite images taken with Wide Field Camera 3 (WFC3) aboard the Hubble Space Telescope (HST) and ask them to estimate the age of the star cluster. Through a multistage process, the project will educate and familiarize the user with the appearance of each age category based on the presence and shape of H-alpha emission, degree of resolution of the individual stars, and color of the cluster. (Whitmore et al. 2011). Additionally, the project will involve the actual measurement of the star cluster and H-alpha cloud radii to be used for further assessment and reinforcement of age. The data from this project and the statistics it yields will quantify these ages which can then be used to inform the debate between universal and environmental models of star cluster formation and destruction in galaxies. The tentative launch date is December 2013, therefore early results should be available at the time of the conference.
Delta Project Planning and Implementation in the Netherlands.
ERIC Educational Resources Information Center
Dutt, Ashok K.; Heal, Stephen
1979-01-01
Describes a water management project in the Netherlands which is intended to protect the people, land, and property in the Delta Region from abnormally high floods. Presents background for initiation of the Delta Project and discusses problems encountered in the project to date. (Author/DB)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fonseca, A.; Navarro, A.; Osorio, R.
1996-08-01
Hydrocarbon exploration has nowadays a diversity of technological resources to capture, merge and interpret information from diverse sources. To accomplish this, the integration of geodata for modeling was done through the use of new technologies like Remote Sensing and Geographical Systems of Information and applied to the San Pedro-Machango area, located in the Serrania de Trujillo, west of Costa Bolivar (onshore), eastern Maracaibo Basin, Venezuela. The main purpose of this work was to optimize the design of an exploration program in harmony with environmental conservation procedures. Starting with satellital and radar images that incorporated geophysical, geological and environmental information, theymore » then were analyzed and merged to improve the lithological, structural and tectonic interpretation, generating an integrated model that allowed better project design. The use of a system that combines information of geographical, geodetical, geophysical and geological origins with satellital and radar images produced up to date cartography and refined results of image interpretation.« less
From Field Work to Deliverables. Experiences on the Tin House Courtyard Documentation
NASA Astrophysics Data System (ADS)
Bello Caballero, L.; Mezzino, D.; Federman, A.; Santana Quintero, M.
2017-08-01
The Tin House Courtyard is a property of the National Capital Commission (NCC) in Ottawa, Canada. The site is located within the `Mile of History', a historical route running from Parliament Hill to the Governor General's residence. Currently, existing assets are under intervention works that include several preservation and renewal actions. Within the broader project, one of the tasks before construction works started was the documentation of the set of facades. The Carleton Immersive Media Studio (CIMS) at Carleton University in Ottawa was commissioned by NCC to conduct the recording of the area. This paper describes the process undertaken from field work to the final deliverable to the client, as well as the issues faced in between. Nowadays, up to date surveying technologies have revolutionized the methodologies for cultural heritage documentation. In this regard, the recording strategy employed encompassed the use of photogrammetry, laser scanner, total station, as well as different pre and post processing software in order to generate the desired outcomes.
Explorers of the Southern Sky: A History of Australian Astronomy
NASA Astrophysics Data System (ADS)
Haynes, Raymond; Haynes, Roslynn D.; Malin, David; McGee, Richard
1996-06-01
This well-illustrated volume is the most comprehensive account of Australian astronomy to date. It is both an indispensable reference book on the history of astronomy in Australia, and a highly readable study of a scientific discipline in the context of emerging nationhood. It covers not only the science, but the individuals involved and the social and economic climate in which they worked. Starting from the ancient Aboriginal beliefs about the Sky World - the earliest known astronomy, anywhere in the world - we are led through to the most exciting high-tech current and projected research being carried out at Australia's world-class national astronomy facilities, and by groups in Australian universities. All branches of astronomy are covered - optical, infrared, X-ray, gamma-ray, microwave, gravitational wave and theoretical - including the contribution of amateur astronomers. The non-technical language, many illustrations, and explanatory figures, ensure that this guide will appeal to a wide range of readers - including professional astronomers, historians of science, students, amateur astronomers and general readers.
Digested disorder: Quarterly intrinsic disorder digest (January/February/March, 2013).
Uversky, Vladimir N
2013-01-01
The current literature on intrinsically disordered proteins is blooming. A simple PubMed search for "intrinsically disordered protein OR natively unfolded protein" returns about 1,800 hits (as of June 17, 2013), with many papers published quite recently. To keep interested readers up to speed with this literature, we are starting a "Digested Disorder" project, which will encompass a series of reader's digest type of publications aiming at the objective representation of the research papers and reviews on intrinsically disordered proteins. The only two criteria for inclusion in this digest are the publication date (a paper should be published within the covered time frame) and topic (a paper should be dedicated to any aspect of protein intrinsic disorder). The current digest covers papers published during the period of January, February and March of 2013. The papers are grouped hierarchically by topics they cover, and for each of the included paper a short description is given on its major findings.
NMSBA Leveraged Project Interim Status Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ivanov, Sergei A.
We have investigated the quality of copper particles available on the market today and determined their complete unsuitability to be used for copper inks, since all of them were significantly oxidized: there was only 50% of metallic copper in each batch and the rest was Cu 2O and CuO. To date, we have fully identified the challenges and developed the synthesis for large amounts of the copper ink precursor, namely, copper(I) mesityl. Currently, the amounts of tens of grams of the precursor have been obtained. From this precursor, four small batches of copper nanoparticles (50 mg each) have been synthesizedmore » to investigate the possibility of decreasing particle sensitivity to oxygen. These particles have been treated with different surface-stabilizing agents (namely, octylamine, oleylamine, pyridine, benzotriazole, and dodecanethiol) in order to investigate their influence on particle oxygen sensitivity. A batch of copper nanoparticles in the amount of 2 grams has also been synthesized in order to start preparation of test ink batches with different solvents, surfactants, and stabilizers.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-13
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14180-000, 14193-000] Lock+ Hydro Friends Fund XLV, FFP Project 2, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XLV Project No. 14180-000. 2. FFP Project 2, LLC Project No. 14193-000. Dated: March...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-29
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14189-000, 14198-000] Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XL, Project No. 14189-000. 2. FFP Project 56, LLC, Project No. 14198-000. Dated...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-29
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14178-000, 14190-000] Lock+ Hydro Friends Fund XLVII FFP Project 52, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XLVII, Project No. 14178-000. 2. FFP Project 52, LLC, Project No. 14190-000. Dated...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-29
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14187-000, 14199-000] Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XXXIV, Project No. 14187-000. 2. FFP Project 58, LLC, Project No. 14199-000. Dated...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-06
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14185-000, 14196-000] Lock+ Hydro Friends Fund IV, FFP Project 55, LLC; Notice Announcing Filing Priority for Preliminary Permit... Friends Fund IV: Project No. 14185-000. 2. FFP Project 55, LLC: Project No. 14196-000. Dated: February 29...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-29
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14179-000, 14194-000] Lock+ Hydro Friends Fund XLIV FFP Project 51, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XLIV, Project No. 14179-000. 2. FFP Project 51, LLC, Project No. 14194-000. Dated...
Concentrating Solar Power Projects - Yumen 50MW Thermal Oil Trough CSP
project | Concentrating Solar Power | NREL Thermal Oil Trough CSP project Status Date : September 28, 2016 Project Overview Project Name: Yumen 50MW Thermal Oil Trough CSP project Country: China : Thermal Oil Power Block Turbine Capacity (Gross): 50.0 MW Turbine Capacity (Net): 50.0 MW Output Type
Concentrating Solar Power Projects - Solaben 6 | Concentrating Solar Power
: Operational Start Year: 2013 Do you have more information, corrections, or comments? Background Technology MWh/yr (Estimated) Contact(s): Allison Lenthall Company: Abengoa Solar Start Production: August 2013
Concentrating Solar Power Projects - Waad Al Shamal ISCC Plant |
construction Start Year: 2018 Do you have more information, corrections, or comments? Background Technology Solar Start Production: 2018 Participants Developer(s): General Electric Plant Configuration Solar Field
Concentrating Solar Power Projects - Solaben 1 | Concentrating Solar Power
: Operational Start Year: 2013 Do you have more information, corrections, or comments? Background Technology MWh/yr (Estimated) Contact(s): Allison Lenthall Company: Abengoa Solar Start Production: August 2013
Variations and trends of Fagaceae pollen in Northern Sardinia, Italy
NASA Astrophysics Data System (ADS)
Canu, Annalisa; Pellizzaro, Grazia; Arca, Bachisio; Vargiu, Arnoldo
2016-04-01
The aim of this study is to analyze variations in the start and the end dates of pollen season, date of maximum concentration peak, pollen season duration, pollen concentration value and Seasonal Pollen Index of airborne Fagaceae pollen series recorded in Sassari, Northern Italy, and to evaluate their relation to meteorological data. Daily pollen concentration data were measured from 1986 to 2008 in a urban area of northern Sardinia (Italy) using a Burkard seven-day recording volumetric spore trap. The date of the peak occurrence was defined as the day when the cumulated daily pollen values reached the 50 % of the total annual pollen concentration. Meteorological data were recorded during the same period by an automatic weather station. Cumulative Degree days were calculated, for each year, from different starting dates using the daily averaging method. The correlation between meteorological variables and the different characteristics of pollen seasons was analyzed using Spearman's correlation tests. In the city of Sassari the Fagaceae airborne pollen content was mainly due to Quercus. The main pollen season took place from April to June. The longest pollen season appeared in the year 2002. The cumulative counts varied over the years, with a mean value of 5,336 pollen grains, a lowest total of 550 in 1986 and a highest total of 8,678 in 2001. Daily pollen concentrations presented positive correlation with temperature, and negative with relative humidity (p<0,0001) and with rainfall. In addition, Cumulative Degree days were significantly correlated with the dates of maximum concentration peak (p<0,0001).
Nā Inoa Hōkū: Hawaiian and Polynesian star names
NASA Astrophysics Data System (ADS)
Ruggles, Clive L. N.; Kaipo Mahelona, John; Kawena Johnson, Rubellite
2015-08-01
In this paper we report on a 15-year project to construct a comprehensive catalogue of Hawaiian star names documented in historical sources, which is being published this year.While a number of Hawaiian star names are well known, a major challenge is to separate reliable first-hand information, mostly in Hawaiian-language archival sources dating back to the mid-19th century, from later commentaries and interpretations, many of which have introduced assumptions and errors that have become embedded in the literature. Some new star names have also been introduced recently, in the traditional style, as part of the living tradition of Hawaiian and Polynesian voyaging.The starting point for our project was a catalogue of Hawaiian and Polynesian star names published by two of the authors (Johnson and Mahelona) 40 years ago, which contained many first-hand translations of primary sources researched in archives during the 1950s to 1970s. Since that time, a number of new primary sources have been identified, and these and other primary sources have been translated or re-translated as part of the project. The sources, often fragmentary, reveal much more than just the use of star observations for navigation and wayfinding, hugely important as this was. There was no single tradition but a complex and dynamic body of astronomical knowledge. Particular star names are not always consistently applied to the same stars. Accounts of physical characteristics such as the dates and times of appearance and disappearance of particular stars do not necessarily make sense in a Western, objective sense: they may, for example, represent times when the asterisms in question became important for divinatory purposes.Such challenges make it all the more important to construct a resource that is as reliable as possible for future scholars, not only within Hawaiian cultural studies but also for comparative analyses with star names in other parts of Polynesia, which have the potential to shed important new light on beliefs and practices brought to the Hawaiian Islands by the earliest Polynesian settlers.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE...: Address: Telephone Number: Employer's Identification Number: 2. Contract for: __ $_____ Starting Date...
Early Restoration Public Meeting, Alabama | NOAA Gulf Spill Restoration
Public Meeting, Alabama Date: January 23, 2012 Location: Mobile, Alabama Description: The Deepwater public meeting starting at 7:00 p.m. Address: Battle House Marriott Hotel 26 North Royal Street Mobile
Atmospheric Science Data Center
2018-02-21
... MISR-Versioning-V23 Version Number: F13_0023 (aerosol), F08_0023 (land) Production Start Date: 11/1/2017 Product Updates: This is a major revision to aerosol and land surface products, including both product format and algorithm ...
Pennsylvania Department of Transportation's Local Technical Assistance Program (LTAP).
DOT National Transportation Integrated Search
2010-11-01
The Pennsylvania Department of Transportations (PennDOT) Local Technical Assistance Program : (LTAP) was awarded to the Pennsylvania State Association of Township Supervisors (PSATS), with the : contract start date of December 1, 2005. PSATS led t...
... DELTA PREP States Public Health Leadership Initiative (PHL) Social Media Past Projects Get Email Updates To receive email ... Response Data & Statistics (WISQARS) Funded Programs Press Room Social Media Publications Injury Center Teen Dating Violence Recommend on ...
9. Photographic copy of drawing dated June 24, 1908 (Source: ...
9. Photographic copy of drawing dated June 24, 1908 (Source: Salt River Project) Transformer house, general drawing - Theodore Roosevelt Dam, Transformer House, Salt River, Tortilla Flat, Maricopa County, AZ
24 CFR 884.122 - Separate project requirement.
Code of Federal Regulations, 2010 CFR
2010-04-01
... separate ACC List and ACC Part I and shall be assigned a separate project number. All new construction... construction projects where: (1) The units are placed under ACC on the same date; and (2) Such consolidation is...
24 CFR 884.122 - Separate project requirement.
Code of Federal Regulations, 2011 CFR
2011-04-01
... separate ACC List and ACC Part I and shall be assigned a separate project number. All new construction... construction projects where: (1) The units are placed under ACC on the same date; and (2) Such consolidation is...
Concentrating Solar Power Projects - Gujarat Solar One | Concentrating
Solar Power | NREL Gujarat Solar One This page provides information on Gujarat Solar One, a configuration. Status Date: February 12, 2014 Project Overview Project Name: Gujarat Solar One Country: India
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-23
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12429-007] Clark Canyon... b. Project No.: 12429-007. c. Date Filed: May 31, 2012. d. Applicant: Clark Canyon Hydro, LLC . e. Name of Project: Clark Canyon Dam Hydroelectric Project. f. Location: When constructed, the project...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-22
... Amendment of License. b. Project No.: 11313-019. c. Date Filed: March 31, 2010. d. Applicant: White Mountain Hydroelectric Corp. e. Name of Project: Apthorp Hydroelectric Project. f. Location: The project is located on... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11313-019] White Mountain...
Concentrating Solar Power Projects - Delingha 50MW Thermal Oil Parabolic
Trough project | Concentrating Solar Power | NREL Delingha 50MW Thermal Oil Parabolic Trough project Status Date: April 17, 2017 Project Overview Project Name: Delingha 50MW Thermal Oil Parabolic Contractor: IDOM : Thermal energy storage system engineering Plant Configuration Solar Field # of Loops: 190
Concentrating Solar Power Projects - Rayspower Yumen 50MW Thermal Oil
Trough project | Concentrating Solar Power | NREL Rayspower Yumen 50MW Thermal Oil Trough project Status Date: January 31, 2017 Project Overview Project Name: Rayspower Yumen 50MW Thermal Oil . Plant Configuration Solar Field Heat-Transfer Fluid Type: Thermal oil Power Block Turbine Capacity
Concentrating Solar Power Projects - Gulang 100MW Thermal Oil Parabolic
Trough project | Concentrating Solar Power | NREL Gulang 100MW Thermal Oil Parabolic Trough project Status Date: September 29, 2016 Project Overview Project Name: Gulang 100MW Thermal Oil Parabolic ): Webmaster Solar Participants Developer(s): Changzhou Royal Tech Solar Thermal Equipment Co., Ltd. Owner(s
Transit navigation through Northern Sea Route from satellite data and CMIP5 simulations
NASA Astrophysics Data System (ADS)
Khon, Vyacheslav C.; Mokhov, Igor I.; Semenov, Vladimir A.
2017-02-01
Rapid Arctic sea ice decline over the last few decades opens new perspectives for Arctic marine navigation. Further warming in the Arctic will promote the Northern Sea Route (NSR) as an alternative to the conventional Suez or Panama Canal routes for intercontinental shipping. Here we use both satellite data and CMIP5 ensemble of climate models to estimate the NSR transit window allowing intercontinental navigation between Atlantic and Pacific regions. To this end, we introduce a novel approach to calculate start and end dates of the navigation season along the NSR. We show that modern climate models are able to reproduce the mean time of the NSR transit window and its trend over the last few decades. The selected models demonstrate that the rate of increase of the NSR navigation season will slow down over the next few decades with the RCP4.5 scenario. By the end of the 21st century ensemble-mean estimates show an increase of the NSR transit window by about 4 and 6.5 months according to RCP4.5 and 8.5, respectively. Estimated trends for the end date of the navigation season are found to be stronger compared to those for the start date.
Large-scale dam removal on the Elwha River, Washington, USA: fluvial sediment load
Magirl, Christopher S.; Hilldale, Robert C.; Curran, Christopher A.; Duda, Jeffrey J.; Straub, Timothy D.; Domanski, Marian M.; Foreman, James R.
2015-01-01
The Elwha River restoration project, in Washington State, includes the largest dam-removal project in United States history to date. Starting September 2011, two nearly century-old dams that collectively contained 21 ± 3 million m3 of sediment were removed over the course of three years with a top-down deconstruction strategy designed to meter the release of a portion of the dam-trapped sediment. Gauging with sediment-surrogate technologies during the first two years downstream from the project measured 8,200,000 ± 3,400,000 tonnes of transported sediment, with 1,100,000 and 7,100,000 t moving in years 1 and 2, respectively, representing 3 and 20 times the Elwha River annual sediment load of 340,000 ± 80,000 t/y. During the study period, the discharge in the Elwha River was greater than normal (107% in year 1 and 108% in year 2); however, the magnitudes of the peak-flow events during the study period were relatively benign with the largest discharge of 292 m3/s (73% of the 2-year annual peak-flow event) early in the project when both extant reservoirs still retained sediment. Despite the muted peak flows, sediment transport was large, with measured suspended-sediment concentrations during the study period ranging from 44 to 16,300 mg/L and gauged bedload transport as large as 24,700 t/d. Five distinct sediment-release periods were identified when sediment loads were notably increased (when lateral erosion in the former reservoirs was active) or reduced (when reservoir retention or seasonal low flows and cessation of lateral erosion reduced sediment transport). Total suspended-sediment load was 930,000 t in year 1 and 5,400,000 t in year 2. Of the total 6,300,000 ± 3,200,000 t of suspended-sediment load, 3,400,000 t consisted of silt and clay and 2,900,000 t was sand. Gauged bedload on the lower Elwha River in year 2 of the project was 450,000 ± 360,000 t. Bedload was not quantified in year 1, but qualitative observations using bedload-surrogate instruments indicated detectable bedload starting just after full removal of the downstream dam. Using comparative studies from other sediment-laden rivers, the total ungauged fraction of < 2-mm bedload was estimated to be on the order of 1.5 Mt.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-11
... DEPARTMENT OF AGRICULTURE Forest Service Beaver Creek Landscape Management Project, Ashland Ranger... Impact Statement for the Beaver Creek Landscape Management Project was published in the Federal Register... Responsible Official for the Beaver Creek Landscape Management Project. DATES: The Final Environmental Impact...
75 FR 63254 - Notice of Actions Taken at September 16, 2010, Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-14
... water resources projects; (2) approved and tabled certain water resources projects, including approval of one project involving diversions into the basin; and (3) rescinded approval for two water resources projects. DATES: September 16, 2010. ADDRESSES: Susquehanna River Basin Commission, 1721 N. Front...
76 FR 2883 - Humboldt Resource Advisory Committee (RAC)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-18
... INFORMATION CONTACT: Adam Dellinger, Committee Coordinator, at (707) 441-3569; e-mail [email protected] review of all Title II project proposals received to date. Dated: January 10, 2011. Tyrone Kelley, Forest...
Zhao, Jing-Jing; Liu, Liang-Yun
2013-02-01
Flux tower method can effectively monitor the vegetation seasonal and phenological variation processes. At present, the differences in the detection and quantitative evaluation of various phenology extraction methods were not well validated and quantified. Based on the gross primary productivity (GPP) and net ecosystem productivity (NEP) data of temperate forests from 9 forest FLUXNET sites in North America, and by using the start dates (SOS) and end dates (EOS) of the temperate forest growth seasons extracted by different phenology threshold extraction methods, in combining with the forest ecosystem carbon source/sink functions, this paper analyzed the effects of different threshold standards on the extraction results of the vegetations phenology. The results showed that the effects of different threshold standards on the stability of the extracted results of deciduous broadleaved forest (DBF) phenology were smaller than those on the stability of the extracted results of evergreen needleleaved forest (ENF) phenology. Among the extracted absolute and relative thresholds of the forests GPP, the extracted threshold of the DBF daily GPP= 2 g C.m-2.d-1 had the best agreement with the DBF daily GPP = 20% maximum GPP (GPPmax) , the phenological metrics with a threshold of daily GPP = 4 g C.m-2.d-1 was close to that between daily GPP = 20% GPPmax and daily GPP = 50% GPPmax, and the start date of ecosystem carbon sink function was close to the SOS metrics between daily GPP = 4 g C.m-2.d-1 and daily GPP= 20% GPPmax. For ENF, the phenological metrics with a threshold of daily GPP = 2 g C.m-2.d-1 and daily GPP = 4 g C.m-2.d-1 had the best agreement with the daily GPP = 20% GPPmax and daily GPP = 50% GPPmax, respectively, and the start date of the ecosystem carbon sink function was close to the SOS metrics between daily GPP = 2 g C.m-2.d-1 and daily GPP= 10% GPPmax.
Concentrating Solar Power Projects - Orellana | Concentrating Solar Power |
: Operational Start Year: 2012 Do you have more information, corrections, or comments? Background Technology (Estimated) Contact(s): SolarPACES Start Production: August 2012 Cost (approx): 240,000,000 Euro PPA/Tariff
Concentrating Solar Power Projects - Solacor 2 | Concentrating Solar Power
Status: Operational Start Year: 2012 Do you have more information, corrections, or comments? Background : 100,000 MWh/yr (Estimated) Contact(s): Allison Lenthall Company: Abengoa Solar Start Production: March 9
Concentrating Solar Power Projects - MINOS | Concentrating Solar Power |
development Start Year: 2020 Do you have more information, corrections, or comments? Background Technology ): Alex Phocas-Cosmetatos Company: Nur Energie Start Production: 2020 PPA/Tariff Type: Feed-In Tariff PPA
Concentrating Solar Power Projects - Golmud | Concentrating Solar Power |
: 200.0 MW Status: Under construction Start Year: 2018 Do you have more information, corrections, or , 2015 Start Production: July 2018 Cost (approx): 5,380 RMB million Participants Developer(s): Qinghai
Concentrating Solar Power Projects - Solaben 2 | Concentrating Solar Power
Status: Operational Start Year: 2012 Do you have more information, corrections, or comments? Background : 100,000 MWh/yr (Estimated) Contact(s): Allison Lenthall Company: Abengoa Solar Start Production: October
Concentrating Solar Power Projects - Solacor 1 | Concentrating Solar Power
Status: Operational Start Year: 2012 Do you have more information, corrections, or comments? Background : 100,000 MWh/yr (Estimated) Contact(s): Allison Lenthall Company: Abengoa Solar Start Production: February
Concentrating Solar Power Projects - Dadri ISCC Plant | Concentrating Solar
Fresnel reflector Turbine Capacity: Gross: 14.0 MW Status: Under construction Start Year: 2017 Do you have , 2016 Start Production: September 2017 Participants Developer(s): Frenell Owner(s) (%): NTCP EPC
Concentrating Solar Power Projects - Dhursar | Concentrating Solar Power |
: 125.0 MW Status: Operational Start Year: 2014 Do you have more information, corrections, or comments Electricity Generation: 280,000 MWh/yr (Expected) Contact(s): Webmaster Solar Start Production: November 11
Concentrating Solar Power Projects - Solaben 3 | Concentrating Solar Power
Status: Operational Start Year: 2012 Do you have more information, corrections, or comments? Background : 100,000 MWh/yr (Estimated) Contact(s): Allison Lenthall Company: Abengoa Solar Start Production: June
Concentrating Solar Power Projects - Arenales | Concentrating Solar Power |
MW Status: Operational Start Year: 2013 Do you have more information, corrections, or comments Electricity Generation: 166,000 MWh/yr (Estimated) Contact(s): SolarPACES Break Ground: November 2011 Start
The Effects of Tulsa's CAP Head Start Program on Middle-School Academic Outcomes and Progress
ERIC Educational Resources Information Center
Phillips, Deborah; Gormley, William; Anderson, Sara
2016-01-01
This study presents evidence pertinent to current debates about the lasting impacts of early childhood educational interventions and, specifically, Head Start. A group of students who were first studied to examine the immediate impacts of the Tulsa, Oklahoma, Community Action Project (CAP) Head Start program were followed-up in middle school,…
A Study of Classroom Literacy Interventions and Outcomes in Even Start. NCEE 2008-4028
ERIC Educational Resources Information Center
Judkins, David; St. Pierre, Robert; Gutmann, Babette; Goodson, Barbara; von Glatz, Adrienne; Hamilton, Jennifer; Webber, Ann; Troppe, Patricia; Rimdzius, Tracy
2008-01-01
The Even Start Family Literacy Program was established in 1989 to help break the cycle of poverty and illiteracy for low-income families, by improving the literacy skills of parents and their young children. Even Start projects offer family literacy services, defined as four integrated instructional components: (1) Childhood Education (ECE); (2)…
A Guide for Local Nutrition Consultants on the Nutrition Component of Head Start Programs.
ERIC Educational Resources Information Center
Administration for Children, Youth, and Families (DHHS), Washington, DC. Head Start Bureau.
This handbook has been prepared as a guide for the nutritionist providing services to Head Start and other preschool day care programs. Introductory sections describe Project Head Start; the program's major components and aspects of the program; center-based, home-based, child and family development, and Child Development Associate (CDA) programs;…
Agile methodology selection criteria: IT start-up case study
NASA Astrophysics Data System (ADS)
Micic, Lj
2017-05-01
Project management in modern IT companies is often based on agile methodologies which have several advantages compared to traditional methodologies such is waterfall. Having in mind that clients sometimes change project during development it is crucial for an IT company to choose carefully which methodology is going to implement and is it going to be mostly based on one or is it going got be combination of several. There are several modern and often used methodologies but among those Scrum, Kanban and XP programming are usually the most common. Sometimes companies use mostly tools and procedures from one but quite often they use some of the combination of those methodologies. Having in mind that those methodologies are just a framework they allow companies to adapt it for their specific projects as well as for other limitations. These methodologies are in limited usage Bosnia but more and more IT companies are starting to use agile methodologies because it is practice and common not just for their clients abroad but also starting to be the only option in order to deliver quality product on time. However it is always challenging which methodology or combination of several companies should implement and how to connect it to its own project, organizational framework and HR management. This paper presents one case study based on local IT start up and delivers solution based on theoretical framework and practical limitations that case company has.
16. 'EXCELLENT NEW PARADE GROUND BEST SINCE POST ESTABLISHED. STARTED ...
16. 'EXCELLENT NEW PARADE GROUND BEST SINCE POST ESTABLISHED. STARTED BY COL. RALPH PARKER, FINISHED BY COL. TROUPE MILLER, PRESIDIO OF MONTEREY CALIFORNIA.' No date, probably ca. 1936. No signature, photographer probably Anton C. Heidrick. This panoramic view looks east over Soldier Field to the Bay, from the cannons at the west end. Original hand tinted silver gelatin print measures 90.4 cm by 20.2 cm, flush mounted on mat board. - Presidio of Monterey, Soldier Field, Monterey, Monterey County, CA
49 CFR 611.7 - Relation to planning and project development processes.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... (ii) Two years after the project opens for revenue service, the grantee shall collect the “after” data... the project. (i) The plan shall provide for: Collection of “before” data on the current transit system... project; collection of “after” data on the transit system two years after opening of the new start project...