Sample records for projects monitoring planning

  1. Long-Term Ecological Monitoring Field Sampling Plan for 2007

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    T. Haney

    2007-07-31

    This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used t determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007more » investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality.« less

  2. 50 CFR 216.275 - Requirements for monitoring and reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Navy shall complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management tool shall include: (1) A method for prioritizing monitoring projects that clearly... potentially modify subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for...

  3. Umatilla Basin Natural Production Monitoring and Evaluation; 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schwartz, Jesse D.M.; Contor, Craig C.; Hoverson, Eric

    2005-10-01

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). UBNPMEP is coordinated with two ODFW research projects that also monitor and evaluatemore » the success of the Umatilla Fisheries Restoration Plan. Our project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 19000500, Umatilla Hatchery M & E) and smolt outmigration (project No. 198902401, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects comprehensively monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. Table 1 outlines relationships with other BPA supported projects. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan (ODFW and CTUIR 2004), the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (Schwartz & Cameron Under Revision). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPPC 2004). The need for monitoring the natural production of salmonids in the Umatilla River Basin developed with the efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha) coho salmon and (O. kisutch) and enhance summer steelhead (O. mykiss). The need for restoration began with agricultural development in the early 1900's that extirpated salmon and reduced steelhead runs (BOR 1988). The most notable development was the construction and operation of Three-Mile Falls Dam (3MD) and other irrigation projects that dewatered the Umatilla River during salmon migrations. The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and the Oregon Department of Fish and Wildlife (ODFW) developed the Umatilla Hatchery Master Plan to restore the historical fisheries in the basin. The plan was completed in 1990 and included the following objectives: (1) Establish hatchery and natural runs of Chinook and coho salmon. (2) Enhance existing summer steelhead populations through a hatchery program. (3) Provide sustainable tribal and non-tribal harvest of salmon and steelhead. (4) Maintain the genetic characteristics of salmonids in the Umatilla River Basin. (5) Produce almost 48,000 adult returns to Three-Mile Falls Dam. The goals were reviewed in 1999 and were changed to 31,500 adult salmon and steelhead returns (Table 2). We conduct core long-term monitoring activities each year as well as two and three-year projects that address special needs for adaptive management. Examples of these projects include adult passage evaluations (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998), genetic monitoring (Currens & Schreck 1995, Narum et al. 2004), and habitat assessment surveys (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998). Our project goal is to provide quality information to managers and researchers working to restore anadromous salmonids to the Umatilla River Basin. This is the only project that monitors the restoration of naturally producing salmon and steelhead in the basin.« less

  4. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less

  5. Web Based GIS System For Monitoring the Implementation of County Integrated Development Plan a Case Study of Nandi County, Kenya.

    NASA Astrophysics Data System (ADS)

    Kurui, P. K.; Mutua, F.

    2016-12-01

    The paper seek to propose a conceptual framework of a way of monitoring and evaluating the implementation of the projects listed in the county integrated development plan by applying the use of the geospatial technologies with the focus being developing a web based GIS system in which the public can be able to track and monitor the progress of implementation of the projects in various parts of the county , although the guidelines developed by the ministry of devolution provides for the inclusion of the implementation monitoring and evaluation framework specifying projects to be implemented during the plan period and specification of veriable indicators it does not provide mechanisms for public participation during implementation and monitoring stage. This calls for a system that the public can interact with. The web based GIS system has been developed using the free open source softwares. Development projects have been categorized into; ongoing, completed and planned It can also be shown that a web based GIS system can be used as an important tool for monitoring the implementation of the CIDP due to its easy to use nature and supported by the fact that internet is easily accessed by the majority of the public making it a powerful tool for public participation.

  6. Quality Assurance Project Plan Development Tool

    EPA Pesticide Factsheets

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  7. Monitoring and Evaluating Nonpoint Source Watershed Projects

    EPA Pesticide Factsheets

    This guide is written primarily for those who develop and implement monitoring plans for watershed management projects. it can also be used evaluate the technical merits of monitoring proposals they might sponsor. It is an update to the 1997 Guide.

  8. Guidelines for designing short-term bird monitoring projects

    Treesearch

    Jonathan Bart

    2005-01-01

    The Coordinated Bird Monitoring Program (Bart and Ralph, this volume) program is helping biologists around the country design short-term monitoring projects for birds. We have found that addressing a series of questions (table 1), in a systematic way, helps insure that projects are well planned. The process is being used by several States and...

  9. A Planning Approach for Developing Inventory and Monitoring Programs In National Parks

    Treesearch

    David L. Peterson; David G. Silsbee; Daniel L. Schmoldt

    1995-01-01

    This document offers some conceptual ideas on how individual parks could plan and implement an Inventory and Monitoring (I&M) program. In several respects, the authors ideas parallel and complement the I&M project planning and development process outlined in the Natural Resources Inventory and Monitoring Guideline (NPS-75). However, no universal techniques...

  10. Study of the Cherokee Nuclear Station: projected impacts, monitoring plan, and mitigation options for Cherokee County, South Carolina

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peelle, E.; Schweitzer, M.; Scharre, P.

    1979-07-01

    This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possiblemore » through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability.« less

  11. Optimum-AIV: A planning and scheduling system for spacecraft AIV

    NASA Technical Reports Server (NTRS)

    Arentoft, M. M.; Fuchs, Jens J.; Parrod, Y.; Gasquet, Andre; Stader, J.; Stokes, I.; Vadon, H.

    1991-01-01

    A project undertaken for the European Space Agency (ESA) is presented. The project is developing a knowledge based software system for planning and scheduling of activities for spacecraft assembly, integration, and verification (AIV). The system extends into the monitoring of plan execution and the plan repair phase. The objectives are to develop an operational kernel of a planning, scheduling, and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in initial specification of the AIV plan, in verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of Jan. 1991, is that a further analysis of the AIV domain has taken place through interviews with satellite AIV experts, a software requirement document (SRD) for the full operational tool was approved, and an architectural design document (ADD) for the kernel excluding external interfaces is ready for review.

  12. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoverson, Eric D.; Amonette, Alexandra

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meachammore » Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success. An Aquatic Habitat Inventory was conducted from river mile 0-8 on Isquulktpe Creek and the data collected was compared with data collected in 1994. Monitoring plans will continue throughout the duration of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance in accordance with the Umatilla River Subbasin Salmon and Steelhead Production Plan (NPPC 1990) and the Final Umatilla Willow Subbasin Plan (Umatilla/Willow Subbasin Planning Team 2005).« less

  13. 36 CFR 219.30 - Plan documentation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... also contains maps, monitoring and evaluation results, the annual monitoring and evaluation report, and... annual monitoring and evaluation report; and (6) A summary of the projected program of work, updated... years; and a display of the budget trends over at least the past 5 years. (e) Other components. A plan...

  14. 12 CFR 1291.7 - Monitoring.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...' discretion. (iii) Risk factors and other monitoring—(A) Risk factors; other monitoring. A Bank's written monitoring policies shall take into account risk factors such as the amount of AHP subsidy in the project... reasonable risk-based sampling plan to review the back-up project documentation. (2) Reliance on long-term...

  15. 12 CFR 1291.7 - Monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...' discretion. (iii) Risk factors and other monitoring—(A) Risk factors; other monitoring. A Bank's written monitoring policies shall take into account risk factors such as the amount of AHP subsidy in the project... reasonable risk-based sampling plan to review the back-up project documentation. (2) Reliance on long-term...

  16. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less

  17. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deborah L. Layton; Kimberly Frerichs

    2011-12-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less

  18. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deborah L. Layton; Kimberly Frerichs

    2010-07-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less

  19. The Air Sensor Citizen Science Toolbox: A Collaboration in Community Air Quality Monitoring and Mapping?

    EPA Science Inventory

    Project GoalDevelop tools Citizen Scientists can use to assist them in conducting environmental monitoringResearch PlanIdentify a citizen science project as a potential pilot study locationEstablish their pollutant monitoring interestsDevelop a sensor package to meet their needs ...

  20. Remote sensing applied to crop disease control, urban planning, and monitoring aquatic plants, oil spills, rangelands, and soil moisture

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The application of remote sensing techniques to land management, urban planning, agriculture, oceanography, and environmental monitoring is discussed. The results of various projects are presented along with cost effective considerations.

  1. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  2. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  3. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  4. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  5. A Monitoring and Assessment Plan for the Youth Employment and Demonstration Projects Act of 1977.

    ERIC Educational Resources Information Center

    Employment and Training Administration (DOL), Washington, DC.

    Intended as a general blueprint for monitoring and assessing activities under the Youth Employment and Demonstration Projects Act of 1977, this document discusses the expected constraints, evaluation and assessment tools, the analytic framework, and monitoring and review schedule. Five problem areas are recognized as potential constraints in…

  6. Final Technical Report: Development of Post-Installation Monitoring Capabilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Polagye, Brian

    2014-03-31

    The development of approaches to harness marine and hydrokinetic energy at large-scale is predicated on the compatibility of these generation technologies with the marine environment. At present, aspects of this compatibility are uncertain. Demonstration projects provide an opportunity to address these uncertainties in a way that moves the entire industry forward. However, the monitoring capabilities to realize these advances are often under-developed in comparison to the marine and hydrokinetic energy technologies being studied. Public Utility District No. 1 of Snohomish County has proposed to deploy two 6-meter diameter tidal turbines manufactured by OpenHydro in northern Admiralty Inlet, Puget Sound, Washington.more » The goal of this deployment is to provide information about the environmental, technical, and economic performance of such turbines that can advance the development of larger-scale tidal energy projects, both in the United States and internationally. The objective of this particular project was to develop environmental monitoring plans in collaboration with resource agencies, while simultaneously advancing the capabilities of monitoring technologies to the point that they could be realistically implemented as part of these plans. In this, the District was joined by researchers at the Northwest National Marine Renewable Energy Center at the University of Washington, Sea Mammal Research Unit, LLC, H.T. Harvey & Associates, and Pacific Northwest National Laboratory. Over a two year period, the project team successfully developed four environmental monitoring and mitigation plans that were adopted as a condition of the operating license for the demonstration project that issued by the Federal Energy Regulatory Commission in March 2014. These plans address nearturbine interactions with marine animals, the sound produced by the turbines, marine mammal behavioral changes associated with the turbines, and changes to benthic habitat associated with colonization of the subsea base support structure. In support of these plans, the project team developed and field tested a strobe-illuminated stereooptical camera system suitable for studying near-turbine interactions with marine animals. The camera system underwent short-term field testing at the proposed turbine deployment site and a multi-month endurance test in shallower water to evaluate the effectiveness of biofouling mitigation measures for the optical ports on camera and strobe pressure housings. These tests demonstrated that the camera system is likely to meet the objectives of the near-turbine monitoring plan and operate, without maintenance, for periods of at least three months. The project team also advanced monitoring capabilities related to passive acoustic monitoring of marine mammals and monitoring of tidal currents. These capabilities will be integrated in a recoverable monitoring package that has a single interface point with the OpenHydro turbines, connects to shore power and data via a wet-mate connector, and can be recovered to the surface for maintenance and reconfiguration independent of the turbine. A logical next step would be to integrate these instruments within the package, such that one instrument can trigger the operation of another.« less

  7. Groundwater Monitoring Plan. Volume 2. Final Quality Assurance Project Plan

    DTIC Science & Technology

    1993-10-01

    5 Table 4-2. US EPA Drinking Water MCLs ........................................ 4-6 Table 5-1. Sample Bottle Requirements, Preservation, and Holding... drinking water . " The types of quality control samples that will be collected during the Canal Creek groundwater monitoring program. ]- Jacobs...Revision No.: 0 Date: 10/27/93 Page: 6 of 9 Canal Creek Area, APG-EA, Maryland Groundwater Monitoring Plan, VOLUME I1 Table 4-2. US EPA Drinking Water

  8. L-325 Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, Robin E.; Sackschewsky, Michael R.

    2008-09-30

    This document provides a review and status of activities conducted in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades. It includes time-zero monitoring results for planting activities conducted in January 2008, annual survival monitoring for all planting years (2007 and 2008), and recommendations for the successful completion of DOE habitat mitigation commitments for this project.

  9. Project Planning and Reporting

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Project Planning Analysis and Reporting System (PPARS) is automated aid in monitoring and scheduling of activities within project. PPARS system consists of PPARS Batch Program, five preprocessor programs, and two post-processor programs. PPARS Batch program is full CPM (Critical Path Method) scheduling program with resource capabilities. Can process networks with up to 10,000 activities.

  10. Confederated Tribes Umatilla Indian Reservation (CTUIR) Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project : Annual Report Fiscal Year 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoverson, Eric D.; Amonette, Alexandra

    2008-12-02

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2007 Fiscal Year (FY) reporting period (February 1, 2007-January 31, 2008) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight fisheries habitat enhancement projects were implemented on Meacham Creek,more » Camp Creek, Greasewood Creek, Birch Creek, West Birch Creek, and the Umatilla River. Specific restoration actions included: (1) rectifying five fish passage barriers on four creeks, (2) planting 1,275 saplings and seeding 130 pounds of native grasses, (3) constructing two miles of riparian fencing for livestock exclusion, (4) coordinating activities related to the installation of two off-channel, solar-powered watering areas for livestock, and (5) developing eight water gap access sites to reduce impacts from livestock. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at all existing easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Monitoring plans will continue throughout the life of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success.« less

  11. 75 FR 14449 - Statement of Organization, Functions, and Delegations of Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... and procedures, and provides direction, planning and evaluation for information technology systems and... development, monitoring and evaluation of public health capabilities, plans, infrastructure and systems to... and maintains a real-time management information system to monitor projects funded by the State and...

  12. Buffer zone monitoring plan for the Dos Rios subdivision, Gunnison, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    This report presents a plan for water quality monitoring at the Dos Rios subdivision (Units 2, 3, and the Island Unit) that is intended to satisfy the informational needs of residents who live southwest (downgradient) of the former Gunnison processing site. Water quality monitoring activities described in this report are designed to protect the public from residual contamination that entered the ground water as a result of previous uranium milling operations. Requirements presented in this monitoring plan are also included in the water sampling and analysis plan (WSAP) for the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project site. Themore » Gunnison WSAP is a site-specific document prepared by the U.S. Department of Energy (DOE) that provides background, guidance, and justification for future ground water sampling and analysis activities for the UMTRA Project Gunnison processing and disposal sites. The WSAP will be updated annually, as additional water quality data are collected and interpreted, to provide ongoing protection for public health and the environment.« less

  13. Principles and Practices for Quality Assurance and Quality Control

    USGS Publications Warehouse

    Jones, Berwyn E.

    1999-01-01

    Quality assurance and quality control are vital parts of highway runoff water-quality monitoring projects. To be effective, project quality assurance must address all aspects of the project, including project management responsibilities and resources, data quality objectives, sampling and analysis plans, data-collection protocols, data quality-control plans, data-assessment procedures and requirements, and project outputs. Quality control ensures that the data quality objectives are achieved as planned. The historical development and current state of the art of quality assurance and quality control concepts described in this report can be applied to evaluation of data from prior projects.

  14. PLANNING AND IMPLEMENTING A REAL-TIME AIR POLLUTION MONITORING AND OUTREACH PROGRAM FOR YOUR COMMUNITY: THE AIRBEAT PROJECT OF ROXBURY, MASSACHUSETTS

    EPA Science Inventory

    EPA has developed a technology transfer handbook for the EMPACT Roxbury Air Monitoring (AirBeat) Project. The purpose of AirBeat is to make real-time air quality monitoring information (for ozone, black carbon, and fine particulates) available to the Boston MA community of Roxbur...

  15. Malaysia's Experience in the Monitoring of Investment and Results of Water Resources Management

    NASA Astrophysics Data System (ADS)

    Zakaria, Salmah Binti; Lee, Jin

    2010-05-01

    The current status of IWRM implementation in Malaysia, overview of development planning process and financial allocations together with monitoring of IWRM in Malaysia are first presented. This is followed by a case study review of Malaysia's 9th 5-year Development Plan (2005-2010) so as to provide a deeper understanding and appreciation of the current approach adopted by the Malaysian government in the formulation of development policies, project planning, budget allocation and o monitoring of projects. Arising from the review it was highlighted that the water-related, sectoral developmental objectives are found in all the 5 developmental thrusts in the 9th Malaysia Plan. This is because water is an essential natural resource and is also an economic good. Thus, it was concluded that in order for the monitoring of investments in IWRM and results to be effective and useful to support policy formulation to achieve the goal of IWRM there is a need for a collation of all information reported under the different, water-related, sectoral developmental objectives in the 9th Malaysia Plan to be organised within an IWRM framework. It was also concluded that a major IWRM challenge for Malaysia is how to make the transition from the current, narrow, sector-specific, financial and budgeting paradigm of the sectorial agencies to the “total cost” paradigm that involves taking into consideration and integrating the costs in other sectors affected by any projects proposed within a sector. The current, sectorial-focus approach, adopted in the 9th Malaysia Plan, logically measures the effectiveness of sectorial agencies by their ability to achieve their immediate sectorial goals and targets, most often with emphasis on infrastructure projects since the impacts of such projects are usually immediate and visible. However, the use of such approach alone, without taking into account the costs that are borne by other interfacing sectors, and also within the sector over the long term, is unsustainable.

  16. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  17. User manual and spreadsheet tool for implementing performance planning for rural planning organizations.

    DOT National Transportation Integrated Search

    2017-03-01

    The performance-planning tool developed as part of this project is intended for use with the guidebook for establishing and using rural performance based transportation system assessment, monitoring, planning, and programming to support the rural pla...

  18. Hungry Horse Mitigation; Flathead Lake, 2001-2002 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry

    2003-06-09

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Councilmore » in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the interconnected Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of potential mitigation strategies. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-6.« less

  19. Integrated risk and recovery monitoring of ecosystem restorations on contaminated sites

    USGS Publications Warehouse

    Hooper, Michael J.; Glomb, Stephen J.; Harper, David; Hoelzle, Timothy B.; McIntosh, Lisa M.; Mulligan, David R.

    2016-01-01

    Ecological restorations of contaminated sites balance the human and ecological risks of residual contamination with the benefits of ecological recovery and the return of lost ecological function and ecosystem services. Risk and recovery are interrelated dynamic conditions, changing as remediation and restoration activities progress through implementation into long-term management and ecosystem maturation. Monitoring restoration progress provides data critical to minimizing residual contaminant risk and uncertainty, while measuring ecological advancement toward recovery goals. Effective monitoring plans are designed concurrently with restoration plan development and implementation and are focused on assessing the effectiveness of activities performed in support of restoration goals for the site. Physical, chemical, and biotic measures characterize progress toward desired structural and functional ecosystem components of the goals. Structural metrics, linked to ecosystem functions and services, inform restoration practitioners of work plan modifications or more substantial adaptive management actions necessary to maintain desired recovery. Monitoring frequency, duration, and scale depend on specific attributes and goals of the restoration project. Often tied to restoration milestones, critical assessment of monitoring metrics ensures attainment of risk minimization and ecosystem recovery. Finally, interpretation and communication of monitoring findings inform and engage regulators, other stakeholders, the scientific community, and the public. Because restoration activities will likely cease before full ecosystem recovery, monitoring endpoints should demonstrate risk reduction and a successional trajectory toward the condition established in the restoration goals. A detailed assessment of the completed project's achievements, as well as unrealized objectives, attained through project monitoring, will determine if contaminant risk has been minimized, if injured resources have recovered, and if ecosystem services have been returned. Such retrospective analysis will allow better planning for future restoration goals and strengthen the evidence base for quantifying injuries and damages at other sites in the future.

  20. Nuclear rocket propulsion. NASA plans and progress, FY 1991

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Miller, Thomas J.

    1991-01-01

    NASA has initiated planning for a technology development project for nuclear rocket propulsion systems for space explorer initiative (SEI) human and robotic missions to the moon and Mars. An interagency project is underway that includes the Department of Energy National Laboratories for nuclear technology development. The activities of the project planning team in FY 1990 and 1991 are summarized. The progress to date is discussed, and the project plan is reviewed. Critical technology issues were identified and include: (1) nuclear fuel temperature, life, and reliability; (2) nuclear system ground test; (3) safety; (4) autonomous system operation and health monitoring; and (5) minimum mass and high specific impulse.

  1. Nuclear rocket propulsion: NASA plans and progress - FY 1991

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Miller, Thomas J.

    1991-01-01

    NASA has initiated planning for a technology development project for nuclear rocket propulsion systems for space exploration initiative (SEI) human and robotic missions to the Moon and to Mars. An interagency project is underway that includes the Department of Energy National Laboratories for nuclear technology development. The activities of the project planning team in FY 1990 and 1991 are summarized. The progress to date is discussed, and the project plan is reviewed. Critical technology issues were identified and include: (1) nuclear fuel temperature, life, and reliability; (2) nuclear system ground test; (3) safety; (4) autonomous system operation and health monitoring; and (5) minimum mass and high specific impulse.

  2. 76 FR 78916 - Rice Solar Energy Project Record of Decision (DOE/EIS-0439)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... Protection Plan. The Biological Resources Mitigation Implementation and Monitoring Plan will include accurate... consideration that water is a limited resource, the Project owner would use dry cooling, which avoids... markets and transmits wholesale electrical power through an integrated 17,000-circuit mile, high- voltage...

  3. NASA's Plans for Developing Life Support and Environmental Monitoring and Control Systems

    NASA Technical Reports Server (NTRS)

    Lawson, B. Michael; Jan, Darrell

    2006-01-01

    Life Support and Monitoring have recently been reworked in response to the Vision for Space Exploration. The Exploration Life Support (ELS) Project has replaced the former Advanced Life Support Element of the Human Systems Research and Technology Office. Major differences between the two efforts include: the separation of thermal systems into a new stand alone thermal project, deferral of all work in the plant biological systems, relocation of food systems to another organization, an addition of a new project called habitation systems, and overall reduction in the number of technology options due to lower funding. The Advanced Environmental Monitoring and Control (AEMC) Element is retaining its name but changing its focus. The work planned in the ELS and AEMC projects is organized around the three major phases of the Exploration Program. The first phase is the Crew Exploration Vehicle (CEV). The ELS and AEMC projects will develop hardware for this short duration orbital and trans-lunar vehicle. The second phase is sortie landings on the moon. Life support hardware for lunar surface access vehicles including upgrades of the CEV equipment and technologies which could not be pursued in the first phase due to limited time and budget will be developed. Monitoring needs will address lunar dust issues, not applicable to orbital needs. The ELS and AEMC equipment is of short duration, but has different environmental considerations. The third phase will be a longer duration lunar outpost. This will consist of a new set of hardware developments better suited for long duration life support and associated monitoring needs on the lunar surface. The presentation will show the planned activities and technologies that are expected to be developed by the ELS and AEMC projects for these program phases.

  4. Educational Technology, E.C.I.A. Chapter 2. Final Evaluation Report.

    ERIC Educational Resources Information Center

    District of Columbia Public Schools, Washington, DC. Div. of Quality Assurance.

    The Planning, Monitoring and Implementing (PMI) Evaluation Model for Decision-Making was used by the District of Columbia Public Schools to monitor their Office of Educational Technology in its efforts to provide direction and coordination for computer related activities, and to plan and implement educational television projects in math and…

  5. Hungry Horse Dam Wildlife Habitat Enhancement Project: Long-Term Habitat Management Plan, Elk and Mule Deer Winter Range Enhancement, Firefighter Mountain and Spotted Bear Winter Ranges.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Casey, Daniel; Malta, Patrick

    1990-06-01

    Project goals are to rehabilitate 1120 acres of big game (elk and mule deer, Odocoileus hemionus) winter range on the Hungry Horse and Spotted Bear Districts of Flathead National Forest lands adjacent to Hungry Horse Reservoir. This project represents the initial phase of implementation toward the mitigation goal. A minimum of 547 acres Trust-funded enhancements are called for in this plan. The remainder are part of the typical Forest Service management activities for the project area. Monitor and evaluate the effects of project implementation on the big game forage base and elk and mule deer populations in the project area.more » Monitor enhancement success to determine effective acreage to be credited against mitigation goal. Additional enhancement acreage will be selected elsewhere in the Flathead Forest or other lands adjacent'' to the reservoir based on progress toward the mitigation goal as determined through monitoring. The Wildlife Mitigation Trust Fund Advisory Committee will serve to guide decisions regarding future enhancement efforts. 7 refs.« less

  6. 33 CFR 332.6 - Monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...., forested wetlands, bogs). Following project implementation, the district engineer may reduce or waive the... performance standards, and may include plans (such as as-built plans), maps, and photographs to illustrate...

  7. DEVELOPING AND IMPLEMENTING A BIRD MIGRATION MONITORING, ASSESSMENT AND PUBLIC OUTREACH PROGRAM FOR YOUR COMMUNITY - THE BIRDCAST PROJECT

    EPA Science Inventory

    The USEPA has developed a technology transfer handbook for the EMPACt BirdCast bird migration monitoring project. The document is essentially a "How-To" Handbook that addresses the planning and implementation steps that were needed to develop, operate and maintain a program simil...

  8. NASA LCLUC Program: An Integrated Forest Monitoring System for Central Africa

    NASA Technical Reports Server (NTRS)

    Laporte, Nadine; LeMoigne, Jacqueline; Elkan, Paul; Desmet, Olivier; Paget, Dominique; Pumptre, Andrew; Gouala, Patrice; Honzack, Miro; Maisels, Fiona

    2004-01-01

    Central Africa has the second largest unfragmented block of tropical rain forest in the world; it is also one of the largest carbon and biodiversity reservoirs. With nearly one-third of the forest currently allocated for logging, the region is poised to undergo extensive land-use change. Through the mapping of the forests, our Integrated Forest Monitoring System for Central Africa (INFORMS) project aims to monitor habitat alteration, support biodiversity conservation, and promote better land-use planning and forest management. Designed as an interdisciplinary project, its goal is to integrate data acquired from satellites with field observations from forest inventories, wildlife surveys, and socio-economic studies to map and monitor forest resources. This project also emphasizes on collaboration and coordination with international, regional, national, and local partners-including non-profit, governmental, and commercial sectors. This project has been focused on developing remote sensing products for the needs of forest conservation and management, insuring that research findings are incorporated in forest management plans at the national level. The societal impact of INFORMS can be also appreciated through the development of a regional remote sensing network in central Africa. With a regional office in Kinshasa, (www.OSFAC.org), the contribution to the development of forest management plans for 1.5 million hectares of forests in northern Republic of Congo (www.tt-timber.com), and the monitoring of park encroachments in the Albertine region (Uganda and DRC) (www.albertinerift.org).

  9. The Soils and Groundwater – EM-20 S&T Roadmap Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The Soils and Groundwater – EM-20 Science and Technology Roadmap Project is a U.S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies and technology for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by EM-20 Roadmap Project staff.

  10. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. Themore » 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).« less

  11. Learning about the Effects of Development Education Programmes: Strengthening Planning, Monitoring, and Evaluation (PME) through Reflective Practice

    ERIC Educational Resources Information Center

    Van Ongevalle, Jan; Huyse, Huib; Van Petegem, Peter

    2013-01-01

    This article reports on the results of an action research project (2010-13) in which ten Belgian organizations who implement development education programmes explored different planning, monitoring, and evaluation (PME) approaches with the aim of learning more effectively about their results. PME approaches piloted included outcome mapping, most…

  12. Hungry Horse Mitigation; Flathead Lake, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2005-06-01

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-8.« less

  13. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2008-12-22

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  14. Hungry Horse Mitigation; Flathead Lake, 2004-2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2006-06-01

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  15. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2009-08-06

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  16. 36 CFR 219.30 - Plan documentation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... also contains maps, monitoring and evaluation results, the annual monitoring and evaluation report, and... overall strategy for maintenance or restoration of sustainability, including desired conditions and... annual monitoring and evaluation report; and (6) A summary of the projected program of work, updated...

  17. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Treesearch

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  18. IDF Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, Robin E.; Sackschewsky, Michael R.

    This document provides a review and status of activities conducted in support of the CH2MHill Hanford Group (CHG) Compensatory Mitigation Implementation Plan (MIP) for the Integrated Disposal Facility (IDF). It includes time-zero monitoring results for planting activities conducted in December 2007, annual survival monitoring for all planting years, a summary of artificial burrow observations, and recommendations for the successful completion of DOE mitigation commitments for this project.

  19. Drilling and Production Testing the Methane Hydrate Resource Potential Associated with the Barrow Gas Fields

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steve McRae; Thomas Walsh; Michael Dunn

    2010-02-22

    In November of 2008, the Department of Energy (DOE) and the North Slope Borough (NSB) committed funding to develop a drilling plan to test the presence of hydrates in the producing formation of at least one of the Barrow Gas Fields, and to develop a production surveillance plan to monitor the behavior of hydrates as dissociation occurs. This drilling and surveillance plan was supported by earlier studies in Phase 1 of the project, including hydrate stability zone modeling, material balance modeling, and full-field history-matched reservoir simulation, all of which support the presence of methane hydrate in association with the Barrowmore » Gas Fields. This Phase 2 of the project, conducted over the past twelve months focused on selecting an optimal location for a hydrate test well; design of a logistics, drilling, completion and testing plan; and estimating costs for the activities. As originally proposed, the project was anticipated to benefit from industry activity in northwest Alaska, with opportunities to share equipment, personnel, services and mobilization and demobilization costs with one of the then-active exploration operators. The activity level dropped off, and this benefit evaporated, although plans for drilling of development wells in the BGF's matured, offering significant synergies and cost savings over a remote stand-alone drilling project. An optimal well location was chosen at the East Barrow No.18 well pad, and a vertical pilot/monitoring well and horizontal production test/surveillance well were engineered for drilling from this location. Both wells were designed with Distributed Temperature Survey (DTS) apparatus for monitoring of the hydrate-free gas interface. Once project scope was developed, a procurement process was implemented to engage the necessary service and equipment providers, and finalize project cost estimates. Based on cost proposals from vendors, total project estimated cost is $17.88 million dollars, inclusive of design work, permitting, barging, ice road/pad construction, drilling, completion, tie-in, long-term production testing and surveillance, data analysis and technology transfer. The PRA project team and North Slope have recommended moving forward to the execution phase of this project.« less

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.

    This annual report is a deliverable for fiscal year 2006 (FY06) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to the 2000 and 2004 Biological Opinions on operation of the Federal Columbia River Power System. The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates implementation of the Estuary RME Plan. In FY06, EOS project accomplishments included: 1) subgroup meetings; 2)more » participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, PISCES; 4) quarterly project status reports; and 5) a major revision to the Estuary RME Plan (new version May 2006) based on comments by EOS members, the Independent Scientific Review Panel, and other reviewers. In the context of uncertainty about the direction of the federal RME due to litigation on the FCRPS Biological Opinion, FY06 activities for the EOS project resulted in expanded substantive coordination with other regional RME forums, project tracking infrastructure, and a new version of the Estuary RME Plan.« less

  1. Administrative and Technical Support for the U.S. Army Medical Research and Development Command Joint Working Group on Medical Chemical Defense

    DTIC Science & Technology

    1989-08-01

    microproces;qor databaAing systems for monitoring project and contract reports and program technology trans. fers, coordinating and providing administratIvo ...The JWGD 3 annual planning process generally included: - Program review by the JWGD’ membership at quarterly meetings, which consisted of the review...Office developed the program planning and budget documents associated with the planning process outlined above. Program project databases and

  2. Hood River Fish Habitat Project; Confederated Tribes of the Warm Springs Reservation of Oregon, Annual Report 2002-2003.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vaivoda, Alexis

    2004-02-01

    This report summarizes the project implementation and monitoring of all habitat activities in the Hood River basin that occurred over the October 1, 2002 to September 30, 2003 period (FY 03). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 03. A description of the progress during FY 03 and reasoning for deviation from the original tasks and timeline are provided. OBJECTIVE 1 - Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administrative oversight and coordination of the habitat statement of work, budget, subcontracts,more » personnel, implementation, and monitoring was provided. OBJECTIVE 2 - Continue to coordinate, implement, and revise, as needed, the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document was utilized for many purposes including: drafting the Watershed Action Plan (Coccoli, 2002), ranking projects for funding, and prioritizing projects to target in the future. This document has been reviewed by many, including stakeholders, agencies, and interested parties. The Hood River Watershed Group Coordinator and author of the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan, Holly Coccoli, has updated and revised the plan. Changes will be reflected in the Hood River Subbasin Plan, and after submission of the Subbasin Plan, a formally revised version of the Monitoring Plan will be put out for review. This will more specifically address changes in the Hood River subbasin since 2000, and reflect changes to fish habitat and needs in the Hood River subbasin regarding monitoring. OBJECTIVE 3 - Evaluate and monitor the habitat, accessibility, and presence of winter steelhead, coho salmon, and resident trout upstream of the Middle Fork Irrigation District water sources on Evans Creek. Through this project, BPA funded the Middle Fork Irrigation District (MFID) a total of $194,000 in FY 03 for the Glacier Ditch- Evans Creek project. BPA funds accounted for approximately 30% of the project while the remaining 70% was cost-shared by the MFID, the US Forest Service, and the Oregon Watershed Enhancement Board. The MFID operated irrigation diversions on Evans Creek (Hutson pond RM 4.0 and the Evans Creek diversion RM 5.5), a tributary to the East Fork Hood River. Both diversions had inadequate upstream fish passage, and utilized Evans Creek to transport Eliot Branch water to distribute irrigation water lower in the basin. This project consisted of: piping a portion of the Glacier ditch to create a pressurized irrigation pipeline system, piping the Hutson extension, removing the culvert on Evans Creek near the Glacier ditch, removing the culvert above the Hutson pond, revegetating the disturbed areas, and providing adequate and approved fish passage on Evans Creek. Prior to any work, Brian Connors with MFID completed a NEPA checklist. Some of the key regulatory points of this project included wetland delineations, a cultural resources survey, and consultations with NOAA Fisheries, U.S. Fish and Wildlife, Oregon Department of Fish and Wildlife (ODFW), and the U.S. Army Corps of Engineers. This project will eliminate the overflow of silty water into Evans Creek and West Fork Evans Creek. Upon completion of this project, access to 2.5 miles of winter steelhead, coho salmon, and resident trout habitat will be restored. Elimination of the interbasin transfer of water will discontinue the conveyance of silty Eliot Branch water into clear East Fork tributaries. Additionally, less water taken from Coe Branch, Eliot Branch, and Laurance Lake which will benefit listed steelhead and bull trout. The Glacier Ditch provided irrigation water from the Eliot Branch to upper valley orchards and agriculture for more than 100 years. The Glacier Ditch served approximately 1,438 acres with 18 cfs of water. The Glacier Ditch portion of this project consisted of 12,000 feet of 24-inch HDPE pipe, and was installed in February and March of 2003. Most of this pipeline was installed in or along the Glacier Ditch. The pipe crossed Evans Creek near the concrete diversion. A wooddecked steel bridge will be built during the summer of 2004, to replace the culvert crossing. The bridge will enable Evans Creek to be restored to a natural flow pattern. The pond will be left to equalize with the hydrology of the area. The Hutson Extension phase of this project consisted of 4,330 feet of 48-inch HDPE pipe. This part of the project eliminated the need for the existing diversion and fish ladder at Hutson Pond. This pipe was installed during April 2003 and lies beneath the Evans Creek and West Fork Evans Creek stream channels (Figure 1). One culvert was removed at the Hutson Pond on Evans Creek (RM 3.3).« less

  3. KCBX Quality Assurance Project Plan - October 2014

    EPA Pesticide Factsheets

    This revised plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring by URS Corporation at the KCBX Terminals Company North and South Terminals in Chicago, Ill.

  4. KCBX Quality Assurance Project Plan - February 2014

    EPA Pesticide Factsheets

    This plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring, by URS Corporation, at the KCBX Terminals Company North and South Terminals in Chicago, IL.

  5. Groundwater monitoring well assessment final work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-10-01

    Jacobs Engineering Group Inc. (JEG) has been contracted by Environmental Management Operations (EMO) to develop and implement a Groundwater Monitoring Well Assessment Plan for Canal Creek in the Edgewood Area of Aberdeen Proving Ground (APG-EA). The task will be performed under the provisions of Master Agreement 071914-A-D7, Task Order 142133. The project consists of assessing the condition of existing groundwater monitoring wells in the Canal Creek Area prior to a groundwater sampling program. The following Work Plan describes the technical approach that will be used to conduct field work for the project. Integrity of some monitoring wells installed at APG-EAmore » has come into question because of problems with well completions that were detected in wells at the O-field Study Area during a recent sampling event. Because of this, EPA and APG-DSHE officials have requested a well integrity assessment for a percentage of 168 monitoring wells installed at the Canal Creek Study Area(14 by USATHAMA, 152 by USGS). Results of the well assessment will be used to determine if these wells were completed in a fashion that minimizes the potential for either cross-contamination of aquifers or leakage of water from the surface into the well.« less

  6. Rotorcraft master plan

    NASA Technical Reports Server (NTRS)

    Hwoschinsky, Peter V.

    1992-01-01

    The Rotorcraft Master Plan contains a comprehensive summary of active and planned FAA vertical flight research and development. Since the Master Plan is not sufficient for tracking project status and monitoring progress, the Vertical Flight Program Plan will provide that capability. It will be consistent with the Master Plan and, in conjunction with it, will serve to ensure a hospitable environment if the industry presents a practical vertical-flight initiative.

  7. On-site monitoring of construction of Terror Lake hydroelectric project, Kodiak, Alaska. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hosking, H.

    The report describes the effort by the Fish and Wildlife Service to monitor the construction of the first hydroelectric project built on national wildlife refuge lands under license by the Federal Energy Regulatory Commission. Recommendations are offered for use in planning other projects. Fish and wildlife species of concern included brown bears, Sitka black-tailed deer, mountain goats, raptors (including bald eagles), and several species of salmonid fish. Construction practices relating to erosion control, contaminant management, culvert placement, and siting of project structures are covered.

  8. Designing Project-Based Courses with a Focus on Group Formation and Assessment

    ERIC Educational Resources Information Center

    Richards, Debbie

    2009-01-01

    The value and the pitfalls of project and group work are well recognized. The principles and elements which apply to projects in general, apply to project-based courses. Thoughtful and detailed planning, understanding of the stakeholders and their needs, a good design, appropriate testing, monitoring and quality control and continual management…

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biologicalmore » effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.« less

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    This progress report broadly defines the scope of supplementation plans and activities in the Columbia Basin. It provides the foundation for more detailed analysis of supplementation in subsequent reports in this series. Topics included in this report are: definition of supplementation, project diversity, objectives and performance standards, uncertainties and theory. Since this is a progress report, the content is subject to modification with new information. The supplementation theory will continue to evolve throughout the duration of RASP and beyond. The other topics in this report are essentially complete and are not expected to change significantly. This is the first ofmore » a series of four reports which will summarize information contained in the larger, RASP progress and completion reports. Our goal is to make the findings of RASP more accessible by grouping related topics into smaller but complete narratives on important aspects of supplementation. We are planning to publish the following reports under the general title Supplementation in the Columbia River Basin: Part 1, Background, Description, Performance Measures, Uncertainty and Theory; Part 2, Theoretical Framework and Models; Part 3, Planning Guidelines; and Part 4, Regional Coordination of Research and Monitoring. Supplementation is expected to be a major contributor to the planned increase in salmon and steelhead production in the Columbia Basin. The Fish and Wildlife Program of the Northwest Power Planning Council (NPPC) uses three approaches to protect and enhance salmon and steelhead in the Columbia Basin: (1) enhance fish production; (2) improve passage in the mainstem rivers; and (3) revise harvest management to support the rebuilding of fish runs (NPPC 1987). The fish production segment calls for a three-part approach focused on natural production, hatchery production, and supplementation. Supplementation is planned to provide over half of the total production increases. The Regional Assessment of Supplementation Project (RASP) was initiated as a result of a request by NPPC to address long-standing concerns about the need to coordinate supplementation research, monitoring and evaluation. Such coordination was also recommended by the Supplementation Technical Work Group. In August 1990, the NPPC gave conditional approval to proceed with the final design of the Yakima Production Project. The Council called on the Bonneville Power Administration (BPA) to fund immediately a supplementation assessment to reevaluate, prioritize and coordinate all existing and planned supplementation monitoring and evaluation activities in the basin. Providing for the participation of the fishery agencies and tribes and others having expertise in this area. RASP addresses four principal objectives: (1) provide an overview of ongoing and planned supplementation activities and identify critical uncertainties associated with supplementation, (2) construct a conceptual framework and model which estimates the potential benefits and risks of supplementation and prioritizes uncertainties, (3) provide guidelines for the development of supplementation projects, (4) develop a plan for regional coordination of research and monitoring. These objectives, once attained, will provide the technical tools fishery managers need to carry out the Council's direction to protect and enhance salmon and steelhead. RASP has further divided the four broad objectives into 12 technical topics: (1) definition of supplementation; (2) description of the diversity of supplementation projects; (3) objectives and performance standards; (4) identification of uncertainties; (5) supplementation theory; (6) development of a conceptual model of supplemented populations; (7) development of spreadsheet model of risks and benefits of supplementation; (8) classification of stocks, streams, and supplementation strategies; (9) regional design of supplementation evaluation and monitoring; (10) guidelines for planning supplementation projects (11) application of the spreadsheet model to supplementation planning; and (12) experimental design and decision making with uncertainty.« less

  11. Coastwide Reference Monitoring System (CRMS)

    USGS Publications Warehouse

    2010-01-01

    In 1990, the U.S. Congress enacted the Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) in response to growing awareness of a land loss crisis in Louisiana. Projects funded by CWPPRA require monitoring and evaluation of project effectiveness, and there is also a need to assess the cumulative effects of all projects to achieve a sustainable coastal environment. In 2003, the Louisiana Office of Coastal Protection and Restoration (OCPR) and the U.S. Geological Survey (USGS) received approval from the CWPPRA Task Force to implement the Coastwide Reference Monitoring System (CRMS) as a mechanism to monitor and evaluate the effectiveness of CWPPRA projects at the project, region, and coastwide levels. The CRMS design implements a multiple reference approach by using aspects of hydrogeomorphic functional assessments and probabilistic sampling. The CRMS program is as dynamic as the coastal habitats it monitors. The program is currently funded through CWPPRA and provides data for a variety of user groups, including resource managers, academics, landowners, and researchers.

  12. Quality Assurance Project Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, Michael G.

    This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.

  13. Monitoring and evaluation plan for the Nez Perce Tribal Hatchery

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steward, C.R.

    1996-08-01

    The Nez Perce Tribe has proposed to build and operate the Nez Perce Tribal Hatchery (NPTH) in the Clearwater River subbasin of Idaho for the purpose of restoring self-sustaining populations of spring, summer, and fall chinook salmon to their native habitats. The project comprises a combination of incubation and rearing facilities, satellite rearing facilities, juvenile and adult collection sites, and associated production and harvest management activities. As currently conceived, the NPTH program will produce approximately 768,000 spring chinook parr, 800,000 summer chinook fry, and 2,000,000 fall chinook fry on an annual basis. Hatchery fish would be spawned, reared, and releasedmore » under conditions that promote wild-type characteristics, minimize genetic changes in both hatchery and wild chinook populations, and minimize undesirable ecological interactions. The primary objective is to enable hatchery-produced fish to return to reproduce naturally in the streams in which they are released. These and other characteristics of the project are described in further detail in the Nez Perce Tribal Hatchery Master Plan, the 1995 Supplement to the Master Plan, and the Nez Perce Tribal Hatchery Program Environmental Impact Statement. The report in hand is referred to in project literature as the NPTH Monitoring and Evaluation (M&E) Plan. This report describes monitoring and evaluation activities that will help NPTH managers determine whether they were successful in restoring chinook salmon populations and avoiding adverse ecological impacts.« less

  14. Coastwide Reference Monitoring System (CRMS) Vegetation Volume Index: An assessment tool for marsh habitat focused on the three-dimensional structure at CRMS vegetation monitoring stations

    USGS Publications Warehouse

    Wood, William B.; Visser, Jenneke M.; Piazza, Sarai C.; Sharp, Leigh A.; Hundy, Laura C.; McGinnis, Tommy E.

    2015-12-04

    The VV and VVI will be used to establish trends, to make comparisons, and to evaluate restoration projects. Assessments that rely on the VVI will be included in appropriate Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) project reports and analyses. Implementation of the VVI will give coastal managers a new tool to design, implement, and monitor coastal restoration projects. A yearly trajectory of site, project, basin, and coastwide VVI will be posted on the CRMS Web site as data are collected. The primary purpose of the tool is to assess CWPPRA restoration project effectiveness, but it will also be useful in identifying areas in need of restoration and in coastwide vegetation assessments.

  15. Drilling, Completion, and Data Collection Plans An Assessment of Geological Carbon Sequestration Options in the Illinois Basin: Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Malkewicz, Nicholas; Kirksey, Jim; Finley, Robert

    2015-05-01

    Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over amore » three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly successful, resulting in a well-construction and completion project that surpassed expectations. The world-class HSE results also demonstrate the commitment of all stakeholders in the project. The details follow in the body of this document« less

  16. 78 FR 5855 - Agency Information Collection Activities: Requests for Comments; Clearance of Renewed Approval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... collects information from airport sponsors and planning agencies in order to administer the Airports Grants... funding for airport planning and development projects at airports included in the National Plan of... of 49 CFR 18 for financial management and performance monitoring. Information is collected in the...

  17. Notification: CTS Asheville Superfund Site Update: Sampling, Monitoring, Communication and Opportunities for Cleanup Efficiencies

    EPA Pesticide Factsheets

    Project #OPE-FY14-0044, July 22, 2014. The EPA OIG plans to begin preliminary research of the EPA's sampling, monitoring, communication and opportunities for cleanup efficiencies for the CTS Asheville Superfund Site, North Carolina.

  18. Integrated watershed planning across jurisdictional boundaries

    NASA Astrophysics Data System (ADS)

    Watts, A. W.; Roseen, R.; Stacey, P.; Bourdeau, R.

    2014-12-01

    We will present the foundation for an Coastal Watershed Integrated Plan for three communities in southern New Hampshire. Small communities are often challenged by complex regulatory requirements and limited resources, but are wary of perceived risks in engaging in collaborative projects with other communities. Potential concerns include loss of control, lack of resources to engage in collaboration, technical complexity, and unclear benefits. This project explores a multi-town subwatershed application of integrated planning across jurisdictional boundaries that addresses some of today's highest priority water quality issues: wastewater treatment plant upgrades for nutrient removal; green infrastructure stormwater management for developing and re-developing areas; and regional monitoring of ecosystem indicators in support of adaptive management to achieve nutrient reduction and other water quality goals in local and downstream waters. The project outcome is a collaboratively-developed inter-municipal integrated plan, and a monitoring framework to support cross jurisdictional planning and assess attainment of water quality management goals. This research project has several primary components: 1) assessment of initial conditions, including both the pollutant load inputs and the political, economic and regulatory status within each community, 2) a pollutant load model for point and non-point sources, 3) multi-criteria evaluation of load reduction alternatives 4) a watershed management plan optimized for each community, and for Subwatersheds combining multiple communities. The final plan will quantify the financial and other benefits/drawbacks to each community for both inter municipal and individual pollution control approaches. We will discuss both the technical and collaborative aspects of the work, with lessons learned regarding science to action, incorporation of social, economic and water quality assessment parameters, and stakeholder/researcher interaction.

  19. Using Landsat imagery to detect, monitor, and project net landscape change

    USGS Publications Warehouse

    Reker, Ryan R.; Sohl, Terry L.; Gallant, Alisa L.

    2015-01-01

    Detailed landscape information is a necessary component to bird habitat conservation planning. The U.S. Geological Survey (USGS) Earth Resources Observation and Science (EROS) Center has been providing information on the Earth’s surface for over 40 years via the continuous series of Landsat satellites. In addition to operating, processing, and disseminating satellite images, EROS is the home to nationwide and global landscape mapping, monitoring, and projection products, including:National Land Cover Database (NLCD) – the definitive land cover dataset for the U.S., with updates occurring at five-year intervals;Global Land Cover Monitoring – producing 30m resolution global land cover;LANDFIRE – Landscape Fire and Resource Management Planning Tools–EROS is a partner in this joint program between U.S. Department of Agriculture and Department of Interior that produces consistent, comprehensive, geospatial data and databases that describe vegetation, wildland fuel, and fire regimes across the U.S.;Land Cover Trends – a landscape monitoring and assessment effort to understand the rates, trends, causes, and consequences of contemporary U.S. land use and land cover change; andLand Use and Land Cover (LULC) Modeling – a project extending contemporary databases of landscape change forward and backward in time through moderate-resolution land cover projections.

  20. Strengthening the capacity for health promotion in South Africa through international collaboration.

    PubMed

    Van den Broucke, Stephan; Jooste, Heila; Tlali, Maki; Moodley, Vimla; Van Zyl, Greer; Nyamwaya, David; Tang, Kwok-Cho

    2010-06-01

    This paper describes a project to strengthen the capacity for health promotion in two Provinces in South Africa. The project draws on the key health promotion capacity dimensions of partnership and networking, infrastructure, problem-solving capacity, and knowledge transfer. The project was carried out in a partnership between the Provinces, the Ministry of Health of South Africa, the government of Flanders, Belgium, and the World Health Organization (WHO). The project aimed to: (i) integrate health promotion into national, Provincial and district level health policy plans (ii) strengthen the health promotion capacity in the two Provinces; and (iii) support the development of tools to monitor and evaluate health promotion interventions. Starting from a situation analysis and identification of priority health issues and existing actions in each Province, capacity-building workshops were organized for senior participants from various sectors. Community-based health promotion interventions were then planned and implemented in both Provinces. A systematic evaluation of the project involving an internal audit of project activities and results based on document analysis, site visits, focus groups and interviews with key persons demonstrated that stakeholders in both Provinces saw an increase of capacity in terms of networking, knowledge transfer, problem solving, and to a lesser extent infrastructure. Health promotion had been well integrated in the Provincial health plans, and roll-out processes with local stakeholders had started after the conclusion of the project. The development of tools for monitoring and evaluation of health promotion was less well achieved. The project illustrates how capacities to deliver health promotion interventions in a developing country can be enhanced through international collaboration. The conceptual model of capacity building that served as a basis for the project provided a useful framework to plan, identify and assess the key components of health promotion capacity in an African context.

  1. Evaluation and prioritization of stream habitat monitoring in the Lower Columbia Salmon and Steelhead Recovery Domain as related to the habitat monitoring needs of ESA recovery plans

    USGS Publications Warehouse

    Puls, Amy L.; Anlauf Dunn, Kara; Graham Hudson, Bernadette

    2014-01-01

    The lower Columbia River and its tributaries once supported abundant runs of salmon and steelhead; however, there are five species currently listed under the federal Endangered Species Act (ESA). The National Marine Fisheries Service has completed, and is proposing for adoption, a comprehensive ESA Recovery Plan for the Lower Columbia Evolutionarily Significant Units (ESUs) based on the recovery plans developed by Oregon and Washington. One of the primary factors attributed to the decline of these species is habitat degradation. There are numerous entities conducting status and/or trends monitoring of instream habitat in the lower Columbia River Basin, but because the programs were developed for agency specific reasons, the existing monitoring efforts are not well coordinated, and often lack the spatial coverage, certainty, or species coverage necessary to answer questions related to status and trends of the ESA listed populations. The Pacific Northwest Aquatic Monitoring Partnership’s Integrated Status and Trends Monitoring (ISTM) project was initiated to improve integration of existing and new monitoring efforts by developing recommendations for sampling frames, protocols, and data sharing. In an effort to meet the ISTM project goals, five objectives were identified: (1) identify and prioritize decisions, questions, and monitoring objectives, (2) evaluate how existing programs align with these management decisions, questions, and objectives, (3) identify the most appropriate monitoring design to inform priority management decisions, questions, and objectives, (4) use trade-off analysis to develop specific recommendations for monitoring based on outcomes of Objectives 1-3 and (5) recommend implementation and reporting mechanisms. This report summarizes the effort to address Objectives 1 and 2, detailing the commonalities among the habitat characteristics that all entities measure and monitor, and how the metrics align with the priorities listed in the comprehensive recovery plan for the Lower Columbia ESUs.

  2. Software Configuration Management Plan for the B-Plant Canyon Ventilation Control System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MCDANIEL, K.S.

    1999-08-31

    Project W-059 installed a new B Plant Canyon Ventilation System. Monitoring and control of the system is implemented by the Canyon Ventilation Control System (CVCS). This Software Configuration Management Plan provides instructions for change control of the CVCS.

  3. Monitoring game-based motor rehabilitation of patients at home for better plans of care and quality of life.

    PubMed

    Ponte, S; Gabrielli, S; Jonsdottir, J; Morando, M; Dellepiane, S

    2015-01-01

    This paper describes the biomedical, remote monitoring infrastructure developed and currently tested in the EU REHAB@HOME project to support home rehabilitation of the upper extremity of persons post-stroke and in persons with other neurological disorders, such as Multiple Sclerosis patients, in order to track their progress over therapy and improve their Quality of Life. The paper will specifically focus on describing the initial testing of the tele-rehabilitation system's components for patients' biomedical monitoring over therapy, which support the delivery and monitoring of more personalized, engaging plans of care by rehabilitation centers and services.

  4. Managers Handbook for Software Development

    NASA Technical Reports Server (NTRS)

    Agresti, W.; Mcgarry, F.; Card, D.; Page, J.; Church, V.; Werking, R.

    1984-01-01

    Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences with flight dynamics software development. The management aspects of organizing the project, producing a development plan, estimation costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying are described.

  5. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Childs, Allen

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into amore » 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.« less

  6. Developing inventory and monitoring programs based on multiple objectives

    NASA Astrophysics Data System (ADS)

    Schmoldt, Daniel L.; Peterson, David L.; Silsbee, David G.

    1994-09-01

    Resource inventory and monitoring (I&M) programs in national parks combine multiple objectives in order to create a plan of action over a finite time horizon. Because all program activities are constrained by time and money, it is critical to plan I&M activities that make the best use of available agency resources. However, multiple objectives complicate a relatively straightforward allocation process. The analytic hierarchy process (AHP) offers a structure for multiobjective decision making so that decision-makers’ preferences can be formally incorporated in seeking potential solutions. Within the AHP, inventory and monitoring program objectives and decision criteria are organized into a hierarchy. Pairwise comparisons among decision elements at any level of the hierarchy provide a ratio scale ranking of those elements. The resulting priority values for all projects are used as each project’s contribution to the value of an overall I&M program. These priorities, along with budget and personnel constraints, are formulated as a zero/one integer programming problem that can be solved to select those projects that produce the best program. An extensive example illustrates how this approach is being applied to I&M projects in national parks in the Pacific Northwest region of the United States. The proposed planning process provides an analytical framework for multicriteria decisionmaking that is rational, consistent, explicit, and defensible.

  7. A proposed coast-wide reference monitoring system for evaluating Wetland restoration trajectories in Louisiana

    USGS Publications Warehouse

    Steyer, G.D.; Sasser, C.E.; Visser, J.M.; Swenson, E.M.; Nyman, J.A.; Raynie, R.C.

    2003-01-01

    Wetland restoration efforts conducted in Louisiana under the Coastal Wetlands Planning, Protection and Restoration Act require monitoring the effectiveness of individual projects as well as monitoring the cumulative effects of all projects in restoring, creating, enhancing, and protecting the coastal landscape. The effectiveness of the traditional paired-reference monitoring approach in Louisiana has been limited because of difficulty in finding comparable reference sites. A multiple reference approach is proposed that uses aspects of hydrogeomorphic functional assessments and probabilistic sampling. This approach includes a suite of sites that encompass the range of ecological condition for each stratum, with projects placed on a continuum of conditions found for that stratum. Trajectories in reference sites through time are then compared with project trajectories through time. Plant community zonation complicated selection of indicators, strata, and sample size. The approach proposed could serve as a model for evaluating wetland ecosystems.

  8. A proposed coast-wide reference monitoring system for evaluating wetland restoration trajectories in Louisiana.

    PubMed

    Steyer, Gregory D; Sasser, Charles E; Visser, Jenneke M; Swenson, Erick M; Nyman, John A; Raynie, Richard C

    2003-01-01

    Wetland restoration efforts conducted in Louisiana under the Coastal Wetlands Planning, Protection and Restoration Act require monitoring the effectiveness of individual projects as well as monitoring the cumulative effects of all projects in restoring, creating, enhancing, and protecting the coastal landscape. The effectiveness of the traditional paired-reference monitoring approach in Louisiana has been limited because of difficulty in finding comparable reference sites. A multiple reference approach is proposed that uses aspects of hydrogeomorphic functional assessments and probabilistic sampling. This approach includes a suite of sites that encompass the range of ecological condition for each stratum, with projects placed on a continuum of conditions found for that stratum. Trajectories in reference sites through time are then compared with project trajectories through time. Plant community zonation complicated selection of indicators, strata, and sample size. The approach proposed could serve as a model for evaluating wetland ecosystems.

  9. L-325 Sagebrush Habitat Mitigation Project: FY2009 Compensation Area Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, Robin E.; Sackschewsky, Michael R.

    2009-09-29

    Annual monitoring in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades was conducted in June 2009. MAP guidelines defined mitigation success for this project as 3000 established sagebrush transplants on a 4.5 ha mitigation site after five monitoring years. Annual monitoring results suggest that an estimated 2130 sagebrush transplants currently grow on the site. Additional activities in support of this project included gathering sagebrush seed and securing a local grower to produce between 2250 and 2500 10-in3 tublings for outplanting during the early winter months of FY2010. If the minimummore » number of seedlings grown for this planting meets quality specifications, and planting conditions are favorable, conservative survival estimates indicate the habitat mitigation goals outlined in the MAP will be met in FY2014.« less

  10. Magnetic-Based NDE of Prestressed and Post-Tensioned Concrete Members: The MFL System.

    DOT National Transportation Integrated Search

    1997-07-01

    Many metropolitan areas have begun or are planning to implement traffic monitoring programs to meet the many demands for traffic data. The purpose of this project is to document a series of examples of urban traffic monitoring data collection program...

  11. Albeni Falls Wildlife Mitigation : Annual Report 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Terra-Berns, Mary

    The Albeni Falls Interagency Work Group continued to actively engage in implementing wildlife mitigation actions in 2002. Regular Work Group meetings were held to discuss budget concerns affecting the Albeni Falls Wildlife Mitigation Program, to present potential acquisition projects, and to discuss and evaluate other issues affecting the Work Group and Project. Work Group members protected 1,386.29 acres of wildlife habitat in 2002. To date, the Albeni Falls project has protected approximately 5,914.31 acres of wildlife habitat. About 21% of the total wildlife habitat lost has been mitigated. Administrative activities have increased as more properties are purchased and continue tomore » center on restoration, operation and maintenance, and monitoring. In 2001, Work Group members focused on development of a monitoring and evaluation program as well as completion of site-specific management plans. This year the Work Group began implementation of the monitoring and evaluation program performing population and plant surveys, data evaluation and storage, and map development as well as developing management plans. Assuming that the current BPA budget restrictions will be lifted in the near future, the Work Group expects to increase mitigation properties this coming year with several potential projects.« less

  12. Idaho Habitat Evaluation for Off-Site Mitigation Record : Annual Report 1988.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Idaho. Dept. of Fish and Game.

    1990-03-01

    The Idaho Department of Fish and Game (IDFG) has been monitoring and evaluating existing and proposed habitat improvement projects for steelhead and chinook in the Clearwater and Salmon subbasins since 1984. Projects included in the monitoring are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia Rivers. This monitoring project is also funded under the same authority. A mitigation record is being developed to use actual and potential increases in smolt production as the best measures of benefit frommore » a habitat improvement project. This project is divided into two subprojects: general and intensive monitoring. Primary objectives of the general monitoring subproject are to determine natural production increases due to habitat improvement projects in terms of parr production and to determine natural production status and trends in Idaho. The second objective is accomplished by combining parr density from monitoring and evaluation of BPA habitat projects and from other IDFG management and research activities. The primary objective of the intensive monitoring subproject is to determine the relationships between spawning escapement, parr production, and smolt production in two Idaho streams; the upper Salmon River and Crooked River. Results of the intensive monitoring will be used to estimate mitigation benefits in terms of smolt production and to interpret natural production monitoring in Idaho. 30 refs., 19 figs., 34 tabs.« less

  13. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loll, C.M.

    1994-10-13

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures.

  14. Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad

    2011-10-01

    The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tankmore » inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.« less

  15. ECUT: Energy Conversion and Utilization Technologies program. Chemical Processes project report, FY 1982

    NASA Technical Reports Server (NTRS)

    Wilcox, R. E. (Compiler)

    1983-01-01

    Planned research efforts and reorganization of the Project as the Biocatalysis Research Activity are described, including the following topics: electrocatalysts, fluid extraction, ammonia synthesis, biocatalysis, membrane fouling, energy and economic analysis, decarboxylation, microscopic reaction models, plasmid monitoring, and reaction kinetics.

  16. Chapter 1 - Executive summary

    Treesearch

    Matthew G. Rollins; Robert E. Keane; Zhiliang Zhu

    2006-01-01

    Geospatial data describing wildland fuel and current as well as historical vegetation conditions are essential for planning, implementing, and monitoring projects supported by the National Fire Plan and the Healthy Forests Restoration Act. Scientifically credible, consistent, and standardized spatial data allow fire and land managers to accurately identify the amount...

  17. Accidental spills at sea--risk, impact, mitigation and the need for co-ordinated post-incident monitoring.

    PubMed

    Kirby, Mark F; Law, Robin J

    2010-06-01

    A fully integrated and effective response to an oil or chemical spill at sea must include a well planned and executed post-incident assessment of environmental contamination and damage. While salvage, rescue and clean-up operations are generally well considered, including reviews and exercises, the expertise, resources, networks and logistical planning required to achieve prompt and effective post-spill impact assessment and monitoring are not generally well established. The arrangement and co-ordination of post-incident monitoring and impact assessment need to consider sampling design, biological effects, chemical analysis and collection/interpretation of expert local knowledge. This paper discusses the risks, impacts and mitigation options associated with accidental spills and considers the importance of pre-considered impact assessment and monitoring programmes in the wider response cycle. The PREMIAM (Pollution Response in Emergencies: Marine Impact Assessment and Monitoring; www.premiam.org) project is considered as an example of an improved approach to the planning, co-ordination and conduct of post-incident monitoring.

  18. Model Construct and Calibration of an Integrated Water Quality Model (LM2-Toxic) for the Lake Michigan Mass Balance Project

    EPA Science Inventory

    The Lake Michigan Mass Balance Project (LMMBP) is a part of the Enhanced Monitoring Plan (EMP) for Lake Michigan (McCarty, et al., 2006). PCBs (polychlorinated biphenyls) were one of the targeted pollutants studied in the project. As one of the components in the overall LMMBP mod...

  19. Evaluation of the EIA system on the Island of Mauritius and development of an environmental monitoring plan framework

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ramjeawon, T.; Beedassy, R

    The Environment Protection Act (EPA) in Mauritius provides for the application of an EIA license in respect of undertakings listed in its first schedule. Following the promulgation of the Act in June 1993, the Department of Environment (DOE) is issuing an average of 125 EIA licenses yearly. In general, the review exercise of an environmental impact assessment (EIA) is terminated once the license has been granted. The aim of this project was to evaluate the EIA system in Mauritius and to identify its weaknesses and strengths. One of the main weaknesses, besides the lack of EIA audits, is the absencemore » of EIA follow-up monitoring. It is necessary to distinguish between monitoring done for regulatory purposes (compliance monitoring) and environmental monitoring related to the EIA. With the growth of the tourism industry on the island, coastal development projects have the potential to cause significant environmental impacts . A sample of EIA reports pertaining to this sector was assessed for its quality and follow-up mechanisms. Proposals for the contents of EIA Prediction Audits, Environmental Monitoring Plans (EMP) and the format for an EMP report are made.« less

  20. GB-InSAR monitoring and observational method for landslide emergency management: the Montaguto earthflow (AV, Italy)

    NASA Astrophysics Data System (ADS)

    Ferrigno, Federica; Gigli, Giovanni; Fanti, Riccardo; Intrieri, Emanuele; Casagli, Nicola

    2017-06-01

    On 10 March 2010, because of the heavy rainfall in the preceding days, the Montaguto landslide (Southern Italy) reactivated, affecting both state road 90 Delle Puglie and the Rome-Bari railway. A similar event occurred on May 2005 and on September 2009. As a result, the National Civil Protection Department (DPC) started an accurate monitoring and analysis program. A monitoring project using the GB-InSAR (ground-based interferometric synthetic aperture radar) system was emplaced to investigate the landslide kinematics, plan urgent safety measures for risk mitigation and design long-term stabilization work.Here, we present the GB-InSAR monitoring system results and its applications in the observational method (OM) approach. GB-InSAR is an established instrument for long-term campaigns aimed at early warning and monitoring during construction works. Our paper further develops these aspects in that it highlights how the OM based on the GB-InSAR technique can produce savings in terms of cost and time in engineering projects without compromising safety. This study focuses on the key role played by the monitoring activities during the design and planning activities, with special reference to the emergency phase.

  1. Developing a monitoring and verification plan with reference to the Australian Otway CO2 pilot project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dodds, K.; Daley, T.; Freifeld, B.

    2009-05-01

    The Australian Cooperative Research Centre for Greenhouse Gas Technologies (CO2CRC) is currently injecting 100,000 tons of CO{sub 2} in a large-scale test of storage technology in a pilot project in southeastern Australia called the CO2CRC Otway Project. The Otway Basin, with its natural CO{sub 2} accumulations and many depleted gas fields, offers an appropriate site for such a pilot project. An 80% CO{sub 2} stream is produced from a well (Buttress) near the depleted gas reservoir (Naylor) used for storage (Figure 1). The goal of this project is to demonstrate that CO{sub 2} can be safely transported, stored underground, andmore » its behavior tracked and monitored. The monitoring and verification framework has been developed to monitor for the presence and behavior of CO{sub 2} in the subsurface reservoir, near surface, and atmosphere. This monitoring framework addresses areas, identified by a rigorous risk assessment, to verify conformance to clearly identifiable performance criteria. These criteria have been agreed with the regulatory authorities to manage the project through all phases addressing responsibilities, liabilities, and to assure the public of safe storage.« less

  2. RH-LLW Disposal Facility Project CD-2/3 to Design/Build Proposal Reconciliation Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Annette L. Schafer

    2012-06-01

    A reconciliation plan was developed and implemented to address potential gaps and responses to gaps between the design/build vendor proposals and the Critical Decision-2/3 approval request package for the Remote-Handled Low Level Waste Disposal Facility Project. The plan and results of the plan implementation included development of a reconciliation team comprised of subject matter experts from Battelle Energy Alliance and the Department of Energy Idaho Operations Office, identification of reconciliation questions, reconciliation by the team, identification of unresolved/remaining issues, and identification of follow-up actions and subsequent approvals of responses. The plan addressed the potential for gaps to exist in themore » following areas: • Department of Energy Order 435.1, “Radioactive Waste Management,” requirements, including the performance assessment, composite analysis, monitoring plan, performance assessment/composite analysis maintenance plan, and closure plan • Environmental assessment supporting the National Environmental Policy Act • Nuclear safety • Safeguards and security • Emplacement operations • Requirements for commissioning • General project implementation. The reconciliation plan and results of the plan implementation are provided in a business-sensitive project file. This report provides the reconciliation plan and non-business sensitive summary responses to identified gaps.« less

  3. Kootenai River Wildlife Habitat Enhancement Project : Long-term Bighorn Sheep/Mule Deer Winter and Spring Habitat Improvement Project : Wildlife Mitigation Project, Libby Dam, Montana : Management Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yde, Chis

    1990-06-01

    The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer wintermore » and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.« less

  4. Subsurface Characterization and Seismic Monitoring for the Southwest Partnerships Phase III Demonstration Project at Farnsworth Field, TX

    NASA Astrophysics Data System (ADS)

    Will, R. A.; Balch, R. S.

    2015-12-01

    The Southwest Partnership on Carbon Sequestration is performing seismic based characterization and monitoring activities at an active CO2 EOR project at Farnsworth Field, Texas. CO2 is anthropogenically sourced from a fertilizer and an ethanol plant. The field has 13 CO2 injectors and has sequestered 302,982 metric tonnes of CO2 since October 2013. The field site provides an excellent laboratory for testing a range of monitoring technologies in an operating CO2 flood since planned development is sequential and allows for multiple opportunities to record zero CO2 baseline data, mid-flood data, and fully flooded data. The project is comparing and contrasting several scales of seismic technologies in order to determine best practices for large scale commercial sequestration projects. Characterization efforts include an 85 km2 3D surface seismic survey, baseline and repeat 3D VSP surveys centered on injection wells, cross-well tomography baseline and repeat surveys between injector/producer pairs, and a borehole passive seismic array to monitor induced seismicity. All surveys have contributed to detailed geologic models which were then used for fluid flow and risk assessment simulations. 3D VSP and cross-well data with repeat surveys have allowed for direct comparisons of the reservoir prior to CO2 injection and at eight months into injection, with a goal of imaging the CO2 plume as it moves away from injection wells. Additional repeat surveys at regular intervals will continue to refine the plume. The goal of this work is to demonstrate seismic based technologies to monitor CO2 sequestration projects, and to contribute to best practices manuals for commercial scale CO2 sequestration projects. In this talk the seismic plan will be outlined, progress towards goals enumerated, and preliminary results from baseline and repeat seismic data will be discussed. Funding for this project is provided by the U.S. Department of Energy under Award No. DE-FC26-05NT42591.

  5. Characterization, Monitoring, and Risk Assessment at the IEA GHG Weyburn-Midale CO2 Monitoring and Storage Project, Saskatchewan, Canada.

    NASA Astrophysics Data System (ADS)

    Ben, R.; Chalaturnyk, R.; Gardner, C.; Hawkes, C.; Johnson, J.; White, D.; Whittaker, S.

    2008-12-01

    In July 2000, a major research project was initiated to study the geological storage of CO2 as part of a 5000 tonnes/day EOR project planned for the Weyburn Field in Saskatchewan, Canada. Major objectives of the IEA GHG Weyburn CO2 monitoring and storage project included: assessing the integrity of the geosphere encompassing the Weyburn oil pool for effective long-term storage of CO2; monitoring the movement of the injected CO2, and assessing the risk of migration of CO2 from the injection zone (approximately 1500 metres depth) to the surface. Over the period 2000-2004, a diverse group of 80+ researchers worked on: geological, geophysical, and hydrogeological characterizations at both the regional (100 km beyond the field) and detailed scale (10 km around the field); conducted time-lapse geophysical surveys; carried out surface and subsurface geochemical surveys; and undertook numerical reservoir simulations. Results of the characterization were used for a performance assessment that concluded the risk of CO2 movement to the biosphere was very small. By September 2007, more than 14 Mtonnes of CO2 had been injected into the Weyburn reservoir, including approximately 3 Mtonnes recycled from oil production. A "Final Phase" research project was initiated (2007- 2011) to contribute to a "Best Practices" guide for long-term CO2 storage in EOR settings. Research objectives include: improving the geoscience characterization; further detailed analysis and data collection on the role of wellbores; additional geochemical and geophysical monitoring activities; and an emphasis on quantitative risk assessments using multiple analysis techniques. In this talk a review of results from Phase I will be presented followed by plans and initial results for the Final Phase.

  6. Using community-based evidence for decentralized health planning: insights from Maharashtra, India.

    PubMed

    Shukla, Abhay; Khanna, Renu; Jadhav, Nitin

    2018-01-01

    Health planning is generally considered a technical subject, primarily the domain of health officials with minimal involvement of community representatives. The National Rural Health Mission launched in India in 2005 recognized this gap and mandated mechanisms for decentralized health planning. However, since planning develops in the context of highly unequal power relations, formal spaces for participation are necessary but not sufficient. Hence a project on capacity building for decentralized health planning was implemented in selected districts of Maharashtra, India during 2010-13. This process developed on the platform of officially supported community-based monitoring and planning, a process for community feedback and participation towards health system change. A specific project on capacity building for decentralized planning included a structured learning course and workshops for major stakeholders. An evaluation of the project, including in-depth interviews of various participants and analysis of change in local health planning processes, revealed positive changes in intervention areas, including increased capacity of key stakeholders leading to preparation of evidence-based, innovative planning proposals, significant community oriented changes in utilization of health facility funds, and inclusion of community-based proposals in village, health facility-based block and district plans. Transparency related to planning increased along with responsiveness of health providers to community suggestions. A key lesson is that active facilitation of decentralized health planning and influencing the health system to expand participation, are essential to ensure changes in planning. Effective strategies included: identifying people's health service related priorities through community-based monitoring, capacity building of diverse stakeholders regarding local health planning, and advocacy to enable participation of community-based actors in the planning process. This combination of strategies draws upon the framework of 'empowered participatory governance' which necessitates combining a degree of 'countervailing power' and acceptance of participation by the system, for new forms of governance to emerge. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine © The Author 2014; all rights reserved.

  7. Northwest Montana Wildlife Habitat Enhancement: Hungry Horse Elk Mitigation Project: Monitoring and Evaluation Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Casey, Daniel; Malta, Patrick

    Portions of two important elk (Cervus elaphus) winter ranges totalling 8749 acres were lost due to the construction of the Hungry Horse Dam hydroelectric facility. This habitat loss decreased the carrying capacity of the both the elk and the mule deer (Odocoileus hemionus). In 1985, using funds from the Bonneville Power Administration (BPA) as authorized by the Northwest Power Act, the Montana Department of Fish, Wildlife and Parks (FWP) completed a wildlife mitigation plan for Hungry Horse Reservoir. This plan identified habitat enhancement of currently-occupied winter range as the most cost-efficient, easily implemented mitigation alternative available to address these large-scalemore » losses of winter range. The Columbia Basin Fish and Wildlife Program, as amended in 1987, authorized BPA to fund winter range enhancement to meet an adjusted goal of 133 additional elk. A 28-month advance design phase of the BPA-funded project was initiated in September 1987. Primary goals of this phase of the project included detailed literature review, identification of enhancement areas, baseline (elk population and habitat) data collection, and preparation of 3-year and 10-year implementation plans. This document will serve as a site-specific habitat and population monitoring plan which outlines our recommendations for evaluating the results of enhancement efforts against mitigation goals. 25 refs., 13 figs., 7 tabs.« less

  8. Resource Management in the Microgravity Science Division

    NASA Technical Reports Server (NTRS)

    Casselle, Justine

    2004-01-01

    In the Microgravity Science Division, the primary responsibilities of the Business Management Office are resource management and data collection. Resource management involves working with a budget to do a number of specific projects, while data collection involves collecting information such as the status of projects and workforce hours. This summer in the Business Management Office I assisted Margie Allen with resource planning and the implementation of specific microgravity projects. One of the main duties of a Project Control Specialists, such as my mentor, is to monitor and analyze project manager s financial plans. Project managers work from the bottom up to determine how much money their project will cost. They then set up a twelve month operating plan which shows when money will be spent. I assisted my mentor in checking for variances in her data against those of the project managers. In order to successfully check for those variances, we had to understand: where the project is including plans vs. actual performance, why it is in its present condition, and what the future impact will be based on known budgetary parameters. Our objective was to make sure that the plan, or estimated resources input, are a valid reflection of the actual cost. To help with my understanding of the process, over the course of my tenure I had to obtain skills in Microsoft Excel and Microsoft Access.

  9. A project for monitoring trends in burn severity

    USGS Publications Warehouse

    Eidenshink, Jeffery C.; Schwind, Brian; Brewer, Ken; Zhu, Zhu-Liang; Quayle, Brad; Howard, Stephen M.

    2007-01-01

    Jeff Eidenshink, Brian Schwind, Ken Brewer, Zhi-Liang Zhu, Brad Quayle, and Elected officials and leaders of environmental agencies need information about the effects of large wildfires in order to set policy and make management decisions. Recently, the Wildland Fire Leadership Council (WFLC), which implements and coordinates the National Fire Plan (NFP) and Federal Wildland Fire Management Policies (National Fire Plan 2004), adopted a strategy to monitor the effectiveness of the National Fire Plan and the Healthy Forests Restoration Act (HFRA). One component of this strategy is to assess the environmental impacts of large wildland fires and identify the trends of burn severity on all lands across the United States. To that end, WFLC has sponsored a six-year project, Monitoring Trends in Burn Severity (MTBS), which requires the U.S. Department of Agriculture Forest Service (USDA-FS) and the U.S. Geological Survey (USGS) to map and assess the burn severity for all large current and historical fires. Using Landsat data and the differenced Normalized Burn Ratio (dNBR) algorithm, the USGS Center for Earth Resources Observation and Science (EROS) and USDA-FS Remote Sensing Applications Center will map burn severity of all fires since 1984 greater than 202 ha (500ac) in the east, and 404 ha (1,000 ac) in the west. The number of historical fires from this period combined with current fires occurring during the course of the project will exceed 9,000. The MTBS project will generate burn severity data, maps, and reports, which will be available for use at local, state, and national levels to evaluate trends in burn severity and help develop and assess the effectiveness of land management decisions. Additionally, the information developed will provide a baseline from which to monitor the recovery and health of fire-affected landscapes over time. Spatial and tabular data quantifying burn severity will augment existing information used to estimate risk associated with a range of current and future resource threats. The annual report of 2004 fires has been completed. All data and results will be distributed to the public on a Web site. A Project for Monitoring Trends in Burn Severity

  10. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operation and Maintenance and Monitoring and Evaluation, 2001 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boe, Stephen J.; Ogburn, Parker N.

    2003-03-01

    This is the second annual report of a multi-year project to operate adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to restore fisheries in these streams. Statement of Work Objectives for 2001: (1) Participate in implementation of the comprehensive multiyear operations plan for the Grande Ronde Endemic Spring chinook Supplementation Program (GRESCP). (2) Plan detailed GRESCP Monitoring and Evaluation for future years. (3)more » Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (4) Plan for data collection needs for bull trout. (5) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (6) Collect summer steelhead. (7) Monitor adult endemic spring chinook salmon populations and collect broodstock. (8) Acclimate juvenile spring chinook salmon prior to release into the upper Grande Ronde River and Catherine Creek. (9) Monitor adult population abundance and characteristics of Grande Ronde River spring chinook salmon populations. (10) Monitor condition, movement, and mortality of spring chinook salmon acclimated at remote facilities. (11) Participate in Monitoring & Evaluation of the captive brood component of the Program to document contribution to the Program. (12) Monitor water quality at facilities. (13) Document accomplishments and needs to permitters, comanagers, and funding agencies. (14) Communicate Project results to the scientific community.« less

  11. Quality Assurance Project Plan: Suitability of Leak Detection Technology for Use In Ethanol-Blended Fuel Service

    EPA Science Inventory

    Oversight of this investigation will be provided by the U.S. Environmental Protection Agency through the Environmental Technology Verification (ETV) Program. This project will be performed by Battelle, which manages the ETV Advanced Monitoring Systems (AMS) Center through a coop...

  12. Environmental surveillance master sampling schedule

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bisping, L.E.

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of themore » onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.« less

  13. Improving Collaborative School-Agency Transition Planning: A Statewide DBMS Approach.

    ERIC Educational Resources Information Center

    Peterson, Randolph L.; Roessler, Richard T.

    1997-01-01

    Describes the development and components of a referral database management system developed by the Arkansas Transition Project. The system enables individualized-education-plan team members to refer students with disabilities directly to adult agencies and to receive a monitoring report describing the agency response to the referral. The system is…

  14. Notification: Review of Beaches Environmental Assessment and Coastal Health Act (BEACH Act) Grants for Beach Monitoring and Public Notification

    EPA Pesticide Factsheets

    Project #OPE-FY15-0056, July 14, 2015. The Office of Inspector General (OIG) for the U.S. Environmental Protection Agency (EPA) plans to begin research on Office of Water grants for beach monitoring and public notification under the BEACH Act.

  15. GUIDANCE MANUAL FOR THE PREPARATION OF DEMONSTRATION AND QUALITY ASSURANCE PROJECT PLANS FOR THE VERIFICATION OF FIELD CHARACTERIZATION AND MONITORING TECHNOLOGIES

    EPA Science Inventory

    This work represents the technical and editorial contributions of a large number of U.S. Environmental Protection Agency (EPA) employees and others familiar with or interested in the demonstration and evaluation of innovative site characterization and monitoring technologies. In ...

  16. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : Annual Report, 2001.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    The John Day River is the nation's second longest free-flowing river in the contiguous United States, which is entirely unsupplemented for it's runs of anadromous fish. Located in eastern Oregon, the John Day Basin drains over 8,000 square miles, is Oregon's fourth largest drainage basin, and the basin incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the mainstem John Day River flows 284 miles in a northwesterly direction entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon, summer steelhead, westslope cutthroat, and redband andmore » bull trout, the John Day system is truly a basin with national significance. The Majority of the John Day Basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in John Day to coordinate basin restoration projects, monitoring, planning, and other watershed restoration activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), also located in John Day, who subcontracts the majority of the construction implementation activities for these restoration projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2001, the JDBO and GSWCD continued their successful partnership between the two agencies and basin landowners to implement an additional ten (10) watershed conservation projects. The project types include permanent lay flat diversions, pump stations, and return-flow cooling systems. Project costs in 2001 totaled $572,766.00 with $361,966.00 (67%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources, such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board (OWEB), and individual landowners.« less

  17. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : 2002 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day systemmore » is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day, who contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2002, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, riparian fencing, juniper control, permanent diversions, pump stations, infiltration galleries and return-flow cooling systems. Project costs in 2002 totaled $423,198.00 with a total amount of $345,752.00 (81%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.« less

  18. Project monitoring and evaluation: an enhancing method for health research system management.

    PubMed

    Djalalinia, Shirin; Owlia, Parviz; Malekafzali, Hossein; Ghanei, Mostafa; Babamahmoodi, Abdolreza; Peykari, Niloofar

    2014-04-01

    Planning, organizing, staffing, leading and monitoring are the basic functional component of management. In present article, we aim to define the project monitoring and evaluation in health research system (HRS) considering its success and challenges based on our national experience. IN THIS STUDY BASED ON THE INFORMATION OF ANNUAL MEDICAL SCIENCE UNIVERSITIES EVALUATION DURING THE LAST DECADE THE HRS INDICATORS HAVE BEEN SCORED IN THREE AXES BASED ON HRS FUNCTIONS: Stewardship, capacity building and knowledge production. In this article, we will focus on the results of HRS evaluation from 2002 to 2010, also on its success and challenges. In an overall view, the main results are the experiences of the designing and implantation of such process after pre-project preparation, all parts followed under the whole supervision of the aims of the HRS evaluation. Project management light the way of practical application of knowledge, skills, tools and techniques for better HRS evaluation and management. We concluded that; although monitoring and evaluation as an essential part of HRS Management light the improvement ahead way but we still need to advantage of the new project management advances.

  19. Focus on training at CAFS.

    PubMed

    Azorbo, S; Muna, C

    1993-01-01

    The training and technical assistance programs of the Center for African Family Studies (CAFS), which is part of the International Planned Parenthood Federation for the African Region, were described. Programs included service delivery, management development, family life education, family planning communication, and research monitoring and evaluation. Several courses were offered: a week-long contraceptive technology update course for trainers and supervisors of family planning programs. Management training needs were filled through a 6-week middle level management course, a 2-week senior level management course, a 4-week community based family planning program course, a 6-week financial management of family planning and reproductive health programs course, and a 5-week course in leadership skills for management of women and health programs. Family life education courses were offered under the CAFS Women and Health Program for teachers, curriculum developers, youth leaders, and those working with young people for 3 weeks. Course issues of discussion included population and development, the family in contemporary African life, and policy legislation and laws to promote young people's health and social psychological and ethical aspects of adolescent sexuality. Family planning communication training programs were directed to strengthening IEC knowledge and skills over a 4-week period for senior and middle level personnel. The 3-week press course aimed to train journalists in print and electronic media for French-speaking countries who could gain cover population and family planning issues. The family planning research and evaluation course over 4 weeks aimed to increase the knowledge and skills of health personnel in project design, implementation, monitoring, and evaluation, in order to conduct assessment of program effectiveness. The course was directed to senior and middle level manager researchers, population project directors, and personnel of women-centered projects.

  20. Enhanced Capabilities for Subcritical Experiments (ECSE) Risk Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Urban, Mary Elizabeth

    Risk is a factor, element, constraint, or course of action that introduces an uncertainty of outcome that could impact project objectives. Risk is an inherent part of all activities, whether the activity is simple and small, or large and complex. Risk management is a process that identifies, evaluates, handles, and monitors risks that have the potential to affect project success. The risk management process spans the entire project, from its initiation to its successful completion and closeout, including both technical and programmatic (non-technical) risks. This Risk Management Plan (RMP) defines the process to be used for identifying, evaluating, handling, andmore » monitoring risks as part of the overall management of the Enhanced Capabilities for Subcritical Experiments (ECSE) ‘Project’. Given the changing nature of the project environment, risk management is essentially an ongoing and iterative process, which applies the best efforts of a knowledgeable project staff to a suite of focused and prioritized concerns. The risk management process itself must be continually applied throughout the project life cycle. This document was prepared in accordance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, its associated guide for risk management DOE G 413.3-7, Risk Management Guide, and LANL ADPM AP-350-204, Risk and Opportunity Management.« less

  1. Classifications for Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) site-specific projects: 2010

    USGS Publications Warehouse

    Jones, William R.; Garber, Adrienne

    2013-01-01

    The Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) funds over 100 wetland restoration projects across Louisiana. Integral to the success of CWPPRA is its long-term monitoring program, which enables State and Federal agencies to determine the effectiveness of each restoration effort. One component of this monitoring program is the classification of high-resolution, color-infrared aerial photography at the U.S. Geological Survey’s National Wetlands Research Center in Lafayette, Louisiana. Color-infrared aerial photography (9- by 9-inch) is obtained before project construction and several times after construction. Each frame is scanned on a photogrametric scanner that produces a high-resolution image in Tagged Image File Format (TIFF). By using image-processing software, these TIFF files are then orthorectified and mosaicked to produce a seamless image of a project area and its associated reference area (a control site near the project that has common environmental features, such as marsh type, soil types, and water salinities.) The project and reference areas are then classified according to pixel value into two distinct classes, land and water. After initial land and water ratios have been established by using photography obtained before and after project construction, subsequent comparisons can be made over time to determine land-water change.

  2. Supplement Analysis for the Watershed Management Program Final EIS (DOE EIS /SA-156) - Upper Salmon River Anadromous Fish Passage Improvement Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keller, Carl J.

    2004-07-13

    BPA proposes to fund IDFG to plan and complete construction of fish passage improvements and water conservation activities that are contained within IDFG’s Statement of Work (SOW) for the period 7/1/04 to 6/30/05. The funding request contained in their SOW is part of an ongoing IDFG effort to fund anadromous fish passage projects that fall outside the scope of the Mitchell Act. The proposed SOW activities fall within the following four categories: Phase I-Planning and Design (gather data, perform investigations, and exchange information; perform surveys and assessments to be compliant; survey project sites and perform engineering designs; perform contract andmore » project management); Phase II-Construction and Implementation (procure materials and supplies, prepare contracts and solicit bids, plant native seedlings, complete capital improvements); Phase III-Operation and Maintenance (maintain office operations); and Phase IV- Monitoring and Evaluation (monitor and evaluate post-project effects, reporting). The SOW culminates with proposed construction of 18 capital improvement projects (Table 1 attached). The types of capital improvements include: screening gravity water diversions; consolidating and/or eliminating ditches; evaluating and screening pump diversions; evaluating and implementing water conservation activities; constructing screens along migration routes and rearing areas for hatchery and wild salmon; improving upstream and downstream passage for anadromous fish; and maximize benefits to aquatic habitat. Because each of the proposed projects in the SOW is still in the planning stages, the specifics of each still need to be completed.« less

  3. Manager's handbook for software development, revision 1

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences of the Software Engineering Laboratory (SEL) with flight dynamics software development. The management aspects of the following subjects are described: organizing the project, producing a development plan, estimating costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying.

  4. AprenDes-PERU: Innovations in Decentralization and Active Schools. Report on Year 1. Aprendes Performance Monitoring Plan. Revision

    ERIC Educational Resources Information Center

    Montane, Angelica; Chesterfield, Ray

    2005-01-01

    This document summarizes the results obtained by the AprenDes project in 2004, the project's first year of implementation. It provides the principal findings on program performance from a baseline in May 2004 to the end of the school year (late October 2004). Progress on a number of project objectives related to decentralized school- and…

  5. The Serendip piggyback SETI project

    NASA Technical Reports Server (NTRS)

    Lampton, Michael; Bowyer, Stuart; Werthimer, Dan; Donnelly, Charles; Herrick, Walter

    1988-01-01

    The Serendip project, an ongoing SETI program of monitoring and processing broadband radio signals acquired by existing radio astronomy observatories, are summarized. Serendip operates in a piggyback mode, making use of whatever observing plan is under way at its host observatory. The Serendip system at NRAO and the signature detection and identification techniques used by the project are described. The method used to reject terrestrial interference is discussed.

  6. Moses Lake Fishery Restoration Project : FY 1999 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None given

    2000-12-01

    The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie,more » bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.« less

  7. An ex ante control chart for project monitoring using earned duration management observations

    NASA Astrophysics Data System (ADS)

    Mortaji, Seyed Taha Hossein; Noori, Siamak; Noorossana, Rassoul; Bagherpour, Morteza

    2017-12-01

    In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project's performance indicators, by plotting them on the Shewhart-type control charts over time. However, these control charts are fundamentally designed for processes and ignore project-specific dynamics, which can lead to weak results and misleading interpretations. By paying close attention to the project baseline schedule and using statistical foundations, this paper proposes a new ex ante control chart which discriminates between acceptable (as-planned) and non-acceptable (not-as-planned) variations of the project's schedule performance. Such control chart enables project managers to set more realistic thresholds leading to a better decision making for taking corrective and/or preventive actions. For the sake of clarity, an illustrative example has been presented to show how the ex ante control chart is constructed in practice. Furthermore, an experimental investigation has been set up to analyze the performance of the proposed control chart. As expected, the results confirm that, when a project starts to deflect significantly from the project's baseline schedule, the ex ante control chart shows a respectable ability to detect and report right signals while avoiding false alarms.

  8. Land use planning

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The organization, objectives, and accomplishments of the panel on Land Use Planning are reported. Technology developments, and projected developments are discussed along with anticipated information requirements. The issues for users, recommended remote sensing programs, and space systems are presented. It was found that remote sensing systems are useful in future land use planning. It is recommended that a change detection system for monitoring land use and critical environmental areas be developed by 1979.

  9. Restoring Fossil Creek

    ERIC Educational Resources Information Center

    Flaccus, Kathleen; Vlieg, Julie; Marks, Jane C.; LeRoy, Carri J.

    2004-01-01

    Fossil Creek had been dammed for the past 90 years, and plans were underway to restore the stream. The creek runs through Central Arizona and flows from the high plateaus to the desert, cutting through the same formations that form the Grand Canyon. This article discusses the Fossil Creek monitoring project. In this project, students and teachers…

  10. Monitoring Colonias along the United States-Mexico border

    USGS Publications Warehouse

    Norman, Laura M.; Parcher, Jean W.; Lam, Alven H.

    2004-01-01

    The Colonias Monitoring Program provides a publicly accessible, binational, GIS database to enable civic leaders and c itizens to inventory, analyze, and monitor growth, housing, and infrastructure in border communities. High-technology tools are provided to support planning efforts and development along the border, using a sustainable and comprehensive approach. The collective information can be used by nongovernmental organizations in preparing grant and loan applications for community-improvement projects.

  11. Cultural Resource Protection Plan for the Remote-Handled Low-Level Waste Disposal Facility at the Idaho National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pace, Brenda Ringe; Gilbert, Hollie Kae

    2015-05-01

    This plan addresses cultural resource protection procedures to be implemented during construction of the Remote Handled Low Level Waste project at the Idaho National Laboratory. The plan proposes pre-construction review of proposed ground disturbing activities to confirm avoidance of cultural resources. Depending on the final project footprint, cultural resource protection strategies might also include additional survey, protective fencing, cultural resource mapping and relocation of surface artifacts, collection of surface artifacts for permanent curation, confirmation of undisturbed historic canal segments outside the area of potential effects for construction, and/or archaeological test excavations to assess potential subsurface cultural deposits at known culturalmore » resource locations. Additionally, all initial ground disturbing activities will be monitored for subsurface cultural resource finds, cultural resource sensitivity training will be conducted for all construction field personnel, and a stop work procedure will be implemented to guide assessment and protection of any unanticipated discoveries after initial monitoring of ground disturbance.« less

  12. Annual monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-10-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites is near the town of Gunnison, Colorado; surface remediation and the environmental impacts of remedial action are described in the Gunnison environmental assessment (EA) (DOE, 1992). Remedial action resulted in the elimination of 4.3 acres (ac) 1.7 hectares (ha) of wetlands and mitigation of this loss of wetlands is being accomplished through the enhance of 18.4 ac (7.5 ha) ofmore » riparian plant communities in six spring feed areas on Bureau of Land Management (BLM) land. The description of the impacted and mitigation wetlands is provided in the Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison UMTRA Project Site, Gunnison, Colorado (DOE, 1994), which is attached to the US Army corps of Engineers (USACE) Section 404 Permit. As part of the wetlands mitigation plan, the six mitigation wetlands were fenced in the fall of 1993 to exclude livestock grazing. Baseline of grazed conditions of the wetlands vegetation was determined during the summer of 1993 (DOE, 1994). A 5-year monitoring program of these six sites has been implemented to document the response of vegetation and wildlife to the exclusion of livestock. This annual monitoring report provides the results of the first year of the 5-year monitoring period.« less

  13. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operation and Maintenance and Monitoring and Evaluation, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boe, Stephen J.; Lofy, Peter T.

    2003-03-01

    This is the third annual report of a multi-year project to operate adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to restore fisheries in these streams. Statement of Work Objectives for 2000: (1) Participate in implementation of the comprehensive multiyear operations plan for the Grande Ronde Endemic Spring Chinook Supplementation Program (GRESCP). (2) Plan for recovery of endemic summer steelhead populations in Catherinemore » Creek and the upper Grande Ronde River. (3) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2000. (4) Collect summer steelhead. (5) Collect adult endemic spring chinook salmon broodstock. (6) Acclimate juvenile spring chinook salmon prior to release into the upper Grande Ronde River and Catherine Creek. (7) Document accomplishments and needs to permitters, comanagers, and funding agency. (8) Communicate project results to the scientific community. (9) Plan detailed GRESCP Monitoring and Evaluation for future years. (10) Monitor adult population abundance and characteristics of Grande Ronde River spring chinook salmon populations and incidentally-caught summer steelhead and bull trout. (11) Monitor condition, movement, and mortality of spring chinook salmon acclimated at remote facilities. (12) Monitor water quality at facilities. (13) Participate in Monitoring & Evaluation of the captive brood component of the Program to document contribution to the Program.« less

  14. Telemedicine in the Malaysian Multimedia Super Corridor: towards personalized lifetime health plans.

    PubMed

    Abidi, S S; Yusoff, Z

    1999-01-01

    The Malaysian Telemedicine initiative advocates a paradigm shift in healthcare delivery patterns by way of implementing a person-centred and wellness-focused healthcare system. This paper introduces the Malaysian Telemedicine vision, its functionality and associated operational conditions. In particular, we focus on the conceptualisation of one key Telemedicine component i.e. the Lifetime Health Plan (LHP) system--a distributed multimodule application for the periodic monitoring and generation of health-care advisories for all Malaysians. In line with the LHP project, we present an innovative healthcare delivery info-structure--LifePlan--that aims to provide life-long, pro-active, personalised, wellness-oriented healthcare services to assist individuals to manage and interpret their health needs. Functionally, LifePlan based healthcare services are delivered over the WWW, packaged as Personalised Lifetime Health Plans that allow individuals to both monitor their health status and to guide them in healthcare planning.

  15. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : 2003 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day systemmore » is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, juniper control, permanent diversions, pump stations, and return-flow cooling systems. Due to funding issues and delays, permitting delays, fire closures and landowner contracting problems, 2 projects were canceled and 7 projects were rescheduled to the 2004 construction season. Project costs in 2003 totaled $115,554.00 with a total amount of $64,981.00 (56%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.« less

  16. John Day Watershed Restoration Projects, annual report 2003.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Linda

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day systemmore » is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, juniper control, permanent diversions, pump stations, and return-flow cooling systems. Due to funding issues and delays, permitting delays, fire closures and landowner contracting problems, 2 projects were canceled and 7 projects were rescheduled to the 2004 construction season. Project costs in 2003 totaled $115,554.00 with a total amount of $64,981.00 (56%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.« less

  17. Quality assurance for online adapted treatment plans: Benchmarking and delivery monitoring simulation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Taoran, E-mail: taoran.li.duke@gmail.com; Wu, Qiuwen; Yang, Yun

    Purpose: An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. Methods: The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system wasmore » designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system’s performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Results: Online adapted plans were found to have similar delivery accuracy in comparison to clinical IMRT plans when validated with portal dosimetry IMRT QA. FEMs for the simulated deliveries with intentional MLC errors exhibited distinct patterns for different MLC error magnitudes and directions, indicating that the proposed delivery monitoring system is highly specific in detecting the source of errors. Implementing the proposed QA system for online adapted plans revealed excellent delivery accuracy: over 99% of leaf position differences were within 0.5 mm, and >99% of pixels in the FEMs had fluence errors within 0.5 MU. Patterns present in the FEMs and MLC control point analysis for actual patient cases agreed with the error pattern analysis results, further validating the system’s ability to reveal and differentiate MLC deviations. Calculation of the fluence map based on the DMI was performed within 2 ms after receiving each DMI input. Conclusions: The proposed online delivery monitoring system requires minimal additional resources and time commitment to the current clinical workflow while still maintaining high sensitivity to leaf position errors and specificity to error types. The presented online delivery monitoring system therefore represents a promising QA system candidate for online adaptive radiation therapy.« less

  18. Quality assurance for online adapted treatment plans: benchmarking and delivery monitoring simulation.

    PubMed

    Li, Taoran; Wu, Qiuwen; Yang, Yun; Rodrigues, Anna; Yin, Fang-Fang; Jackie Wu, Q

    2015-01-01

    An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system's performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Online adapted plans were found to have similar delivery accuracy in comparison to clinical IMRT plans when validated with portal dosimetry IMRT QA. FEMs for the simulated deliveries with intentional MLC errors exhibited distinct patterns for different MLC error magnitudes and directions, indicating that the proposed delivery monitoring system is highly specific in detecting the source of errors. Implementing the proposed QA system for online adapted plans revealed excellent delivery accuracy: over 99% of leaf position differences were within 0.5 mm, and >99% of pixels in the FEMs had fluence errors within 0.5 MU. Patterns present in the FEMs and MLC control point analysis for actual patient cases agreed with the error pattern analysis results, further validating the system's ability to reveal and differentiate MLC deviations. Calculation of the fluence map based on the DMI was performed within 2 ms after receiving each DMI input. The proposed online delivery monitoring system requires minimal additional resources and time commitment to the current clinical workflow while still maintaining high sensitivity to leaf position errors and specificity to error types. The presented online delivery monitoring system therefore represents a promising QA system candidate for online adaptive radiation therapy.

  19. A monitoring system for gypsy moth management

    Treesearch

    F. William Ravlin; S. J. Fleischer; M. R. Carter; E. A. Roberts; M. L. McManus

    1991-01-01

    Within the last ten years considerable research has been directed toward the development of a gypsy moth monitoring system for project planning at a regional level and for making control decisions at a local level. Pheromones and pheromone-baited traps have been developed and widely used and several egg mass sampling techniques have also been developed. Recently these...

  20. Environmental Technology Verification Program Advanced Monitoring Systems Center Quality Assurance Project Plan for Verification of Black Carbon Monitors

    EPA Science Inventory

    Black carbon is a term that is commonly used to describe strongly light absorbing carbon (LAC), which is thought to play a significant role in global climate change through direct absorption of light, interaction with clouds, and by reducing the reflectivity of snow and ice. BC ...

  1. The CarbFix Pilot Project in Iceland - CO2 capture and mineral storage in basaltic rocks

    NASA Astrophysics Data System (ADS)

    Sigurdardottir, H.; Sigfusson, B.; Aradottir, E. S.; Gunnlaugsson, E.; Gislason, S. R.; Alfredsson, H. A.; Broecker, W. S.; Matter, J. M.; Stute, M.; Oelkers, E.

    2010-12-01

    The overall objective of the CarbFix project is to develop and optimize a practical and cost-effective technology for capturing CO2 and storing it via in situ mineral carbonation in basaltic rocks, as well as to train young scientist to carry the corresponding knowledge into the future. The project consists of a field injection of CO2 charged water at the Hellisheidi geothermal power plant in SW Iceland, laboratory experiments, numerical reactive transport modeling, tracer tests, natural analogue and cost analysis. The CO2 injection site is situated about 3 km south of the Hellisheidi geothermal power plant. Reykjavik Energy operates the power plant, which currently produces 60,000 tons/year CO2 of magmatic origin. The produced geothermal gas mainly consists of CO2 and H2S. The two gases will be separated in a pilot gas treatment plant, and CO2 will be transported in a pipeline to the injection site. There, CO2 will be fully dissolved in 20 - 25°C water during injection at 25 - 30 bar pressure, resulting in a single fluid phase entering the storage formation, which consists of relatively fresh basaltic lavas. The CO2 charged water is reactive and will dissolve divalent cations from the rock, which will combine with the dissolved carbon to form solid thermodynamically stable carbonate minerals. The injection test is designed to inject 2200 tons of CO2 per year. In the past three years the CarbFix project has been addressing background fluid chemistries at the injection site and characterizing the target reservoir for the planned CO2 injection. Numerous groundwater samples have been collected and analysed. A monitoring and accounting plan has been developed, which integrates surface, subsurface and atmospheric monitoring. A weather station is operating at the injection site for continuous monitoring of atmospheric CO2 and to track all key parameters for the injection. Environmental authorities have granted licenses for the CO2 injection and the use of tracers, based on the monitoring plan. Pipelines, injection and monitoring wells have been installed and equipment test runs are in the final phase. A bailer has been constructed to be used to retrieve samples at reservoir conditions. Hydrological parameters of a three dimensional field model have been calibrated and reactive transport simulations are ongoing. The key risks that the project is currently facing are technical and financial. Until now the project has been facing incidences that have already impacted the time schedule in the CarbFix project. Furthermore the project is facing world-wide exchange rate uncertainty plus the inherited uncertainty that innovative research projects contain. However, the CarbFix group remains optimistic that injection will start in near future.

  2. Go / NGO success ensures Vietnam project.

    PubMed

    2000-02-01

    This article reports the results of a joint evaluation by the Japanese Evaluation Team and the People's Committee of Nghe An on the Japan International Cooperation Agency Vietnam Reproductive Health (RH) Project. The evaluation, which was conducted through a workshop, showed that the Vietnam RH Project in Nghe An Province was successful. With two short-term experts dispatched to Vietnam in November and December 1999, the Project¿s activities were realized. Many activities were undertaken, which included retraining of community health centers, improvement of district health centers¿ monitoring capacity, and prenatal examination. Although the evaluation was carried out after only 2 years of actual activities, the Project¿s planned activities showed a smooth implementation as a result of good collaboration among Japan, the Vietnamese government, and nongovernmental organizations. With the successful outcome of the first phase of the project, both Japan and Vietnam have put up plans for future project activities.

  3. Software engineering project management - A state-of-the-art report

    NASA Technical Reports Server (NTRS)

    Thayer, R. H.; Lehman, J. H.

    1977-01-01

    The management of software engineering projects in the aerospace industry was investigated. The survey assessed such features as contract type, specification preparation techniques, software documentation required by customers, planning and cost-estimating, quality control, the use of advanced program practices, software tools and test procedures, the education levels of project managers, programmers and analysts, work assignment, automatic software monitoring capabilities, design and coding reviews, production times, success rates, and organizational structure of the projects.

  4. Managing for Successful Control of Naturally Occurring Asbestos During Large Scale Grading

    NASA Astrophysics Data System (ADS)

    Saur, R.; Harnish, D.; Cavanaugh, J.; Kendall, K.; Virdee, A.; Ludlam, D.

    2012-12-01

    Pacific Gas and Electric Company recently completed environmental remediation and civil grading of a 35-acre site in San Francisco Bay Area, and the project became recognized with local agencies as having excellent controls systems for naturally-occurring asbestos (NOA). The project began in 2010 and was completed in 2012, and involved excavating and grading over 100,000 tons of soil containing NOA. The work was subject to requirements by state, local and regional agencies, including an asbestos dust mitigation plan for the Bay Area Air Quality Management District. Effective control of NOA is attributed to management approaches combined with effective monitoring and state-of-the-art controls. Management Planning. The contract for construction specified NOA compliance management and controls, including having a NOA-control "czar" ultimately responsible for effective mitigation. An important element was daily pre-planning for excavation/grading that involved both the NOA mitigation experts and construction staff. Personnel Planning and Training. All construction personnel were trained before work regarding NOA hazards and mitigations. Daily tailboards with all construction personnel included discussions of the NOA controls integral to the daily work. Supervision. A NOA mitigation compliance leader was assigned to each excavation operation, responsible for continuously monitoring wind direction and work to ensure mitigation met requirements, and that disturbed areas were hydrosealed or covered. Adaptive Management - Daily and weekly debriefs occurred with those responsible for NOA controls to evaluate effectiveness, and identify improvements needed. If a monitoring result exceeded the project trigger level, work shut down and a root-cause analysis was performed to determine appropriate corrective actions. Deviations of results from background were researched as to cause, and any adjustments identified. Nearby non-project activities were monitored, as they occasionally caused trigger level exceedences in perimeter monitors, including from off-site vehicles, nearby construction, and mechanical vegetation management (e.g. weed whacking). Regulatory and Owner Oversight. Monitoring results were reported daily to agencies, agencies made frequent inspections, and owner's independent compliance representatives observed the NOA mitigation and provided real-time feedback to the construction team. NOA Controls. NOA emissions were controlled site-wide and for each work activity. Site systems included misting, water trucks on roads, temporary covers and soil sealants. Work activity controls for excavation/grading included both source and perimeter controls. Water application technologies specially designed for NOA fiber mitigation, and not just dust mitigation, were effective without adding excessive water to work areas. These activities collectively created a management structure that facilitated successful implementation of NOA control technologies.

  5. 'Advancement of KHPS to DOE TRL 7/8' Project - Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adonizio, Mary Ann; Corren, Dean; Smith, Ron

    Final Report describing activities performed under the 'Advancement of the KHPS to DOE TRL 7/8' project, including the development of critical component test protocols, testing and analysis of the Gen5 KHPS main shaft seal, and continuing compliance work on approved operational environmental monitoring plans in anticipation of KHPS turbine installation at Verdant Power's Roosevelt Island Tidal Energy (RITE) Project site in New York, NY.

  6. CMMI for Services (CMMI-SVC) Overview Presentation

    DTIC Science & Technology

    2008-10-01

    processes 5 CMMI for Services (CMMI-SVC) Overview Forrester, 2008 © 2008 Carnegie Mellon University Why is the CMMI-SVC needed? Service providers...Project Management (IPM) • Project Monitoring and Control (PMC) • Project Planning (PP) • Requirements Management (REQM) • Risk Management (RSKM...contact, and your resume reflecting 5 or more years of service experience to cmmi- svc-app@sei.cmu.edu . 2. Fill out the sponsorship form here: http

  7. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : Annual Report, 2000.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    2001-03-01

    The John Day is the second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles--Oregon's third largest drainage basin--and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, red band, westslope cutthroat, and redband trout, the John Day system is truly amore » basin with national significance. Most all of the entire John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the Basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Using funding from the Bonneville Power Administration, Bureau of Reclamation, and others, the John Day Basin Office (JDBO) subcontracts the majority of its construction implementation activities with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/review, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2000, the JDBO and GSWCD proposed continuation of a successful partnership between the two agencies and basin landowners to implement an additional six watershed conservation projects funded by the BPA. The types of projects include permanent diversions, pump stations, and return-flow cooling systems. Project costs in 2000 totaled $533,196.00 with a total amount of $354,932.00 (67%) provided by the Bonneville Power Administration and the remainder coming from other sources such as the BOR, Oregon Watershed Enhancement Board, and individual landowners.« less

  8. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office: FY 1999 Watershed Restoration Projects : Annual Report 1999.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robertson, Shawn W.

    2001-03-01

    The John Day River is the second longest free-flowing river in the contiguous United States and one of the few major subbasins in the Columbia River basin containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, the fourth largest drainage area in Oregon. With its beginning in the Strawberry Mountains near the town of Prairie City, the John Day flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring chinook salmon and summer steelhead, red band,more » westslope cutthroat, and redband trout, the John Day system is truly one of national significance. The entire John Day basin was granted to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) initiated contracting the majority of its construction implementation actions with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of the projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 1999, the JDBO and GSWCD proposed continuation of a successful partnership between the two agencies and basin landowners to implement an additional eleven (11) watershed conservation projects. The types of projects implemented included installation of infiltration galleries, permanent diversions, pumping stations, and irrigation efficiency upgrades. Project costs in 1999 totaled $284,514.00 with a total amount of $141,628.00 (50%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Confederated Tribes of Warm Springs, Oregon Watershed Enhancement Board, and individual landowners.« less

  9. Performance measurement: A tool for program control

    NASA Technical Reports Server (NTRS)

    Abell, Nancy

    1994-01-01

    Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.

  10. Monitoring and Evaluation Plan for the Nez Perce Tribal Hatchery, 1996 Technical Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steward, Cleveland R.

    1996-08-01

    The Nez Perce Tribe has proposed to build and operate the Nez Perce Tribal Hatchery (NPTH) in the Clearwater River subbasin of Idaho for the purpose of restoring self-sustaining populations of spring, summer, and fall chinook salmon to their native habitats. The project comprises a combination of incubation and rearing facilities, satellite rearing facilities, juvenile and adult collection sites, and associated production and harvest management activities. As currently conceived, the NPTH program will produce approximately 768,000 spring chinook parr, 800,000 summer chinook fry, and 2,000,000 fall chinook fry on an annual basis. Hatchery fish would be spawned, reared, and releasedmore » under conditions that promote wild-type characteristics, minimize genetic changes in both hatchery and wild chinook populations, and minimize undesirable ecological interactions. The primary objective is to enable hatchery-produced fish to return to reproduce naturally in the streams in which they are released. These and other characteristics of the project are described in further detail in the Nez Perce Tribal Hatchery Master Plan (Larson and Mobrand 1992), the 1995 Supplement to the Master Plan (Johnson et al. 1995), and the Nez Perce Tribal Hatchery Program Environmental Impact Statement (Bonneville Power Administration et al. 1996). The report in hand is referred to in project literature as the NPTH Monitoring and Evaluation (M&E) Plan. This report describes monitoring and evaluation activities that will help NPTH managers determine. whether they were successful in restoring chinook salmon populations and avoiding adverse ecological impacts. Program success will be gauged primarily by changes in the abundance and distribution of supplemented chinook populations. The evaluation of project-related impacts will focus on the biological effects of constructing and operating NPTH hatchery facilities, introducing hatchery fish into the natural environment, and removing or displacing wild fish, including targeted chinook, non-targeted chinook, and resident species.« less

  11. Applicability of the Design Tool for Inventory and Monitoring (DTIM) and the Explore Sample Data Tool for the Assessment of Caribbean Forest Dynamics

    Treesearch

    Humfredo Marcano-Vega; Andrew Lister; Kevin Megown; Charles Scott

    2016-01-01

    There is a growing need within the insular Caribbean for technical assistance in planning forest-monitoring projects and data analysis. This paper gives an overview of software tools developed by the USDA Forest Service’s National Inventory and Monitoring Applications Center and the Remote Sensing Applications Center. We discuss their applicability in the efficient...

  12. Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alleman, Glen B.; Nosbisch, Michael R.

    2012-07-01

    DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived frommore » the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)« less

  13. Developing Physics Concepts through Hands-On Problem Solving: A Perspective on a Technological Project Design

    ERIC Educational Resources Information Center

    Hong, Jon-Chao; Chen, Mei-Yung; Wong, Ashley; Hsu, Tsui-Fang; Peng, Chih-Chi

    2012-01-01

    In a contest featuring hands-on projects, college students were required to design a simple crawling worm using planning, self-monitoring and self-evaluation processes to solve contradictive problems. To enhance the efficiency of problem solving, one needs to practice meta-cognition based on an application of related scientific concepts. The…

  14. A case study of resources management planning with multiple objectives and projects

    NASA Astrophysics Data System (ADS)

    Peterson, David L.; Silsbee, David G.; Schmoldt, Daniel L.

    1994-09-01

    Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decision-making tools. We have previously described a multiple objective planning process for inventory and monitoring programs (Schmoldt and others 1994). To test the applicability of that process for the more general needs of resources management planning, we conducted an exercise on the Olympic National Park (NP) in Washington State, USA. Eight projects were selected as typical of those considered in RMPs and five members of the Olympic NP staff used the analytic hierarchy process (AHP) to prioritize the eight projects with respect to their implicit management objectives. By altering management priorities for the park, three scenarios were generated. All three contained some similarities in rankings for the eight projects, as well as some differences. Mathematical allocations of money and people differed among these scenarios and differed substantially from what the actual 1990 Olympic NP RMP contains. Combining subjective priority measures with budget dollars and personnel time into an objective function creates a subjective economic metric for comparing different RMP’s. By applying this planning procedure, actual expenditures of budget and personnel in Olympic NP can agree more closely with the staff’s management objectives for the park.

  15. Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project.

    PubMed

    Antonopoulos, Christos; Asimogloy, Katerina; Chiti, Sarah; D'Onofrio, Luca; Gianfranceschi, Simone; He, Danping; Iodice, Antonio; Koubias, Stavros; Koulamas, Christos; Lavagno, Luciano; Lazarescu, Mihai T; Mujica, Gabriel; Papadopoulos, George; Portilla, Jorge; Redondo, Luis; Riccio, Daniele; Riesgo, Teresa; Rodriguez, Daniel; Ruello, Giuseppe; Samoladas, Vasilis; Stoyanova, Tsenka; Touliatos, Gerasimos; Valvo, Angela; Vlahoy, Georgia

    2016-06-02

    In this article we present the main results obtained in the ARTEMIS-JU WSN-DPCM project between October 2011 and September 2015. The first objective of the project was the development of an integrated toolset for Wireless sensor networks (WSN) application planning, development, commissioning and maintenance, which aims to support application domain experts, with limited WSN expertise, to efficiently develop WSN applications from planning to lifetime maintenance. The toolset is made of three main tools: one for planning, one for application development and simulation (which can include hardware nodes), and one for network commissioning and lifetime maintenance. The tools are integrated in a single platform which promotes software reuse by automatically selecting suitable library components for application synthesis and the abstraction of the underlying architecture through the use of a middleware layer. The second objective of the project was to test the effectiveness of the toolset for the development of two case studies in different domains, one for detecting the occupancy state of parking lots and one for monitoring air concentration of harmful gasses near an industrial site.

  16. Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project

    PubMed Central

    Antonopoulos, Christos; Asimogloy, Katerina; Chiti, Sarah; D’Onofrio, Luca; Gianfranceschi, Simone; He, Danping; Iodice, Antonio; Koubias, Stavros; Koulamas, Christos; Lavagno, Luciano; Lazarescu, Mihai T.; Mujica, Gabriel; Papadopoulos, George; Portilla, Jorge; Redondo, Luis; Riccio, Daniele; Riesgo, Teresa; Rodriguez, Daniel; Ruello, Giuseppe; Samoladas, Vasilis; Stoyanova, Tsenka; Touliatos, Gerasimos; Valvo, Angela; Vlahoy, Georgia

    2016-01-01

    In this article we present the main results obtained in the ARTEMIS-JU WSN-DPCM project between October 2011 and September 2015. The first objective of the project was the development of an integrated toolset for Wireless sensor networks (WSN) application planning, development, commissioning and maintenance, which aims to support application domain experts, with limited WSN expertise, to efficiently develop WSN applications from planning to lifetime maintenance. The toolset is made of three main tools: one for planning, one for application development and simulation (which can include hardware nodes), and one for network commissioning and lifetime maintenance. The tools are integrated in a single platform which promotes software reuse by automatically selecting suitable library components for application synthesis and the abstraction of the underlying architecture through the use of a middleware layer. The second objective of the project was to test the effectiveness of the toolset for the development of two case studies in different domains, one for detecting the occupancy state of parking lots and one for monitoring air concentration of harmful gasses near an industrial site. PMID:27271622

  17. ISIS and META projects

    NASA Technical Reports Server (NTRS)

    Birman, Kenneth; Cooper, Robert; Marzullo, Keith

    1990-01-01

    The ISIS project has developed a new methodology, virtual synchony, for writing robust distributed software. High performance multicast, large scale applications, and wide area networks are the focus of interest. Several interesting applications that exploit the strengths of ISIS, including an NFS-compatible replicated file system, are being developed. The META project is distributed control in a soft real-time environment incorporating feedback. This domain encompasses examples as diverse as monitoring inventory and consumption on a factory floor, and performing load-balancing on a distributed computing system. One of the first uses of META is for distributed application management: the tasks of configuring a distributed program, dynamically adapting to failures, and monitoring its performance. Recent progress and current plans are reported.

  18. Permeable Pavement Demonstration at the Edison Environmental Center - Poster

    EPA Science Inventory

    Poster for the SAB Review detailing the porous pavement parking lot project. The poster describes the design of the parking lot, the research components that were incorporated into the design, and the monitoring plan.

  19. Feasibility Investigation on the Development of a Structural Damage Diagnostic and Monitoring System for Rocket Engines

    NASA Technical Reports Server (NTRS)

    Shen, Ji Y.; Sharpe, Lonnie, Jr.

    1998-01-01

    The research activity for this project is mainly to investigate the necessity and feasibility to develop a structural health monitoring system for rocket engines, and to carry out a research plan for further development of the system. More than one hundred technical papers have been searched and reviewed during the period. We concluded after this investigation that adding a new module in NASA's existing automated diagnostic system to monitor the healthy condition of rocket engine structures is a crucial task, and it's possible to develop such a system based upon the vibrational-based nondestructive damage assessment techniques. A number of such techniques have been introduced. Their advantages and disadvantages are also discussed. A global research plan has been figured out. As the first step of the overall research plan, a proposal for the next fiscal year has been submitted.

  20. Prototype Software Assurance Framework (SAF): Introduction and Overview

    DTIC Science & Technology

    2017-04-05

    Introduction 1 1 Process Management (Category 1) 6 1.1 Process Definition (Area 1.1) 6 1.2 Infrastructure Standards (Area 1.2) 6 1.3 Resources (Area 1.3) 7...1.4 Training (Area 1.4) 8 2 Project Management (Category 2) 9 2.1 Project Plans (Area 2.1) 9 2.2 Project Infrastructure (Area 2.2) 10 2.3 Project...Monitoring (Area 2.3) 10 2.4 Project Risk Management (Area 2.4) 11 2.5 Supplier Management (Area 2.5) 11 3 Engineering (Category 3) 13 3.1 Product

  1. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operation and Maintenance and Monitoring and Evaluation, 1999 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boe, Stephen J.; Lofy, Peter T.

    2002-11-01

    This is the second annual report of a multi-year, multi-agency project to restore spring chinook salmon populations in the Grande Ronde River Basin (Grande Ronde Endemic Chinook Salmon Program--GRESCP). The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) operates adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to increase natural production and restore fisheries in these two streams. Statement of Work Objectives formore » 1999: (1) Participate in development and continued implementation of the comprehensive multi year operations plan for the Grande Ronde Endemic Supplementation Program. (2) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2000. (3) Monitor adult endemic spring chinook salmon populations and collect broodstock. (4) Plan detailed Monitoring and Evaluation for future years. (5) Monitor population abundance and characteristics and local environmental factors that may influence abundance and run timing of Grande Ronde River spring chinook populations. (6) Participate in Monitoring and Evaluation of the captive brood component of the Program to assure this component is contributing to the Program. (7) Participate in data collection for incidentally-caught bull trout and summer steelhead and planning for recovery of summer steelhead populations. (8) Document accomplishments and needs to permitters, comanagers, and funding agencies. (9) Communicate project results to the scientific community.« less

  2. a Study of Co-Planing Technology of Spaceborne, Airborne and Ground Remote Sensing Detecting Resource, Driven by Disaster Emergency Task

    NASA Astrophysics Data System (ADS)

    Yu, F.; Chen, H.; Tu, K.; Wen, Q.; He, J.; Gu, X.; Wang, Z.

    2018-04-01

    Facing the monitoring needs of emergency responses to major disasters, combining the disaster information acquired at the first time after the disaster and the dynamic simulation result of the disaster chain evolution process, the overall plan for coordinated planning of spaceborne, airborne and ground observation resources have been designed. Based on the analysis of the characteristics of major disaster observation tasks, the key technologies of spaceborne, airborne and ground collaborative observation project are studied. For different disaster response levels, the corresponding workflow tasks are designed. On the basis of satisfying different types of disaster monitoring demands, the existing multi-satellite collaborative observation planning algorithms are compared, analyzed, and optimized.

  3. An Application of the PMI Model at the Project Level Evaluation of ESEA Title IV-C Projects.

    ERIC Educational Resources Information Center

    McBeath, Marcia

    All of the papers presented as part of a symposium concerned the application of the Planning, Monitoring, and Implementation Model (PMI) to the evaluation of the District of Columbia Public Schools' programs supported by the Elementary Secondary Education Act (ESEA) Title IV-C. PMI was developed to provide a model for systematic evaluation of…

  4. 76 FR 39858 - Western Pacific Fisheries; Approval of a Marine Conservation Plan for Guam

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ... assessment and monitoring of Guam coral reef flat communities. Objective 6. Domestic fisheries development... life-history data of nearshore reef fish. g. Support Guam volunteer fishery data collection project. h...

  5. Recycling Old PCC Pavement - Performance Evaluation of FAI 57 Inlays

    DOT National Transportation Integrated Search

    1993-02-01

    This report details the construction and performance monitoring efforts of two demonstration projects proposed in an experimental features work plan entitled Recycling Old PCC Pavement". The objectives of this experimental feature were to evaluate th...

  6. Software Management Environment (SME): Components and algorithms

    NASA Technical Reports Server (NTRS)

    Hendrick, Robert; Kistler, David; Valett, Jon

    1994-01-01

    This document presents the components and algorithms of the Software Management Environment (SME), a management tool developed for the Software Engineering Branch (Code 552) of the Flight Dynamics Division (FDD) of the Goddard Space Flight Center (GSFC). The SME provides an integrated set of visually oriented experienced-based tools that can assist software development managers in managing and planning software development projects. This document describes and illustrates the analysis functions that underlie the SME's project monitoring, estimation, and planning tools. 'SME Components and Algorithms' is a companion reference to 'SME Concepts and Architecture' and 'Software Engineering Laboratory (SEL) Relationships, Models, and Management Rules.'

  7. Final Scientific/Technical Report for project “Geomechanical Monitoring for CO 2 Hub Storage: Production and Injection at Kevin Dome

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daley, Thomas M.; Vasco, Don; Ajo-Franklin, Jonathan

    After learning that the TDS value in the target injection formation at the Kevin Dome site is too low to qualify for an EPA Class VI CO2 injection permit, the BSCSP project was re-scoped such that injection of CO2 is no longer planned. With no injection planned, the Geomechanics project was closed. In this final report, we describe the objective and approach of the project as proposed, and the limited results obtained before stopping work. The objective of the proposed research was the development & validation of an integrated monitoring approach for quantifying the interactions between large-scale geological carbon storagemore » (GCS) and subsurface geomechanical state, particularly perturbations relevant to reservoir integrity such as fault reactivation and induced fracturing. In the short period of work before knowing the fate of the Kevin Dome project, we (1) researched designs for both the proposed InSAR corner reflectors as well as the near-surface 3C seismic stations; (2) developed preliminary elastic geomechanical models; (3) developed a second generation deformation prediction for the BSCSP Kevin Dome injection site; and (4) completed a preliminary map of InSAR monuments and shallow MEQ wells in the vicinity of the BSCSP injection pad.« less

  8. A plan for structured management of the Systems Approach to Training (SAT) process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schurman, D.L.

    1987-01-01

    This paper describes the plan and accomplishments for development of a Systematic Management Plan for the Systems Approach to Training (SMPSAT). This project is sponsored by the United States Marine Corps Headquarters training policy branch (HQMC(TAP)). Purpose of this effort is to develop a comprehensive plan for management of the Systems Approach to Training (SAT) system in the USMC. This management plan will allow HQMC to monitor the SAT system in order to provide maximum support to the SAT system in both the formal schools and the Fleet Marine Force.

  9. An efficient temporal logic for robotic task planning

    NASA Technical Reports Server (NTRS)

    Becker, Jeffrey M.

    1989-01-01

    Computations required for temporal reasoning can be prohibitively expensive if fully general representations are used. Overly simple representations, such as totally ordered sequence of time points, are inadequate for use in a nonlinear task planning system. A middle ground is identified which is general enough to support a capable nonlinear task planner, but specialized enough that the system can support online task planning in real time. A Temporal Logic System (TLS) was developed during the Intelligent Task Automation (ITA) project to support robotic task planning. TLS is also used within the ITA system to support plan execution, monitoring, and exception handling.

  10. Earth Observation in Support of Sustainable Urban Planning: Results of the Dragon-3 Monitor Project

    NASA Astrophysics Data System (ADS)

    Cartalis, C.; Polydoros, A.; Mavrakou, T.; Asimakopoulos, D. N.

    2016-08-01

    Sustainable urban planning increasingly demands innovative concepts and techniques to obtain up-to-date and area-wide information on the characteristics and development of the urban system. In this paper, a thorough and conclusive presentation is made in terms of the results of the DRAGON-3 MONITOR project as based on the use of Earth Observation. Results refer in particular to a set of EO based dynamic urban indicators (i.e. urban form and expansion, land use/land cover changes, land surface temperature distribution, the presence and strength of urban heat island) with the capacity to describe the state, dynamic changes and interaction of the land and thermal environment in urban areas. Furthermore results are assessed in terms of their potential to operationally support sustainable urban planning and bridge the gap between EO scientists and urban planners. Constraints related to the spatial resolution and revisit time of satellite sensors are discussed as they influence the accuracy and applicability of the indicators. Methodologies to improve the applicability of the indicators are also discussed along with the presentation of the respective results.

  11. Perspective traffic display format and airline pilot traffic avoidance

    NASA Technical Reports Server (NTRS)

    Ellis, Stephen R.; Mcgreevy, Michael W.; Hitchcock, Robert J.

    1987-01-01

    Part-task experiments have examined perspective projections of cockpit displays of traffic information as a means of presenting aircraft separation information to airline pilots. Ten airline pilots served as subjects in an experiment comparing the perspective projection with plan-view projections of the same air traffic situations. The pilots' task was to monitor the traffic display in order to decide if an avoidance maneuver was needed. Pilots took more time to select avoidance maneuvers with a conventional plan-view display than with an experimental perspective display. In contrast to previous results, if the pilots selected a maneuver with the perspective display, they were more likely to choose one with a vertical component. Tabulation of the outcomes of their initial avoidance decisions with both perspective and plan-view displays showed that they were more likely to achieve required separation with maneuvers chosen with the aid of perspective displays.

  12. Applying the results based management framework to the CERCA multi-component project in adolescent sexual and reproductive health: a retrospective analysis.

    PubMed

    Cordova-Pozo, Kathya; Hoopes, Andrea J; Cordova, Freddy; Vega, Bernardo; Segura, Zoyla; Hagens, Arnold

    2018-02-08

    Adolescent sexual and reproductive health (SRH), problems such as unplanned pregnancies are complex and multifactorial, thus requiring multifaceted prevention interventions. Evaluating the impact of such interventions is important to ensure efficiency, effectiveness and accountability for project funders and community members. In this study, we propose Results Based Management (RBM) as a framework for project management, using the Community Embedded Reproductive Health Care for Adolescents (CERCA) as a case study for RBM. The CERCA Project (2010-2014) tested interventions to reduce adolescent pregnancy in three Latin American countries, Bolivia, Ecuador and Nicaragua. Activities were designed to increase adolescent SRH behaviors in four domains: communication with parents, partners and peers; access to SRH information; access to SRH services; and use of contraception. When the project ended, the outcome evaluation showed limited impact with concerns about accuracy of monitoring and attrition of participants. We reviewed and analyzed a series of CERCA documents and related data sources. Key findings from these documents were organized within an RBM framework (planning, monitoring, and impact evaluation) to understand how CERCA methodology and performance might have reaped improved results. Strengths and weaknesses were identified in all three elements of the RBM framework. In Planning, the proposed Theory of Change (ToC) differed from that which was carried out in the intervention package. Each country implemented a different intervention package without articulated assumptions on how the activities of intervention would bring about change. In Monitoring, the project oversight was mainly based on administrative and financial requirements rather than monitoring fidelity and quality of intervention activities. In Impact Evaluation, the original CERCA evaluation assessed intervention effects among adolescents, without identifying success and failure factors related to the outcomes, the nature of the outcomes, or cost-effectiveness of interventions. This analysis showed that multi-country projects are complex, entail risks in execution and require robust project management. RBM can be a useful tool to ensure a systematic approach at different phases within a multi-country setting.

  13. Prototype PBO Instrumentation of CALIPSO Project Captures World-Record Lava Dome Collapse on Montserrat Volcano

    NASA Astrophysics Data System (ADS)

    Mattioli, Glen S.; Young, Simon R.; Voight, Barry; Sparks, R. Steven J.; Shalev, Eylon; Selwyn, Sacks; Malin, Peter; Linde, Alan; Johnston, William; Hadayat, Dannie; Elsworth, Derek; Dunkley, Peter; Herd, Richard; Neuberg, Jurgen; Norton, Gillian; Widiwijayanti, Christina

    2004-08-01

    This article is an update on the status of an innovative new project designed to enhance generally our understanding of andesitic volcano eruption dynamics and, specifically, the monitoring and scientific infrastructure at the active Soufriàre Hills Volcano (SHV), Montserrat. The project has been designated as the Caribbean Andesite Lava Island Precision Seismo-geodetic Observatory, known as CALIPSO. Its purpose is to investigate the dynamics of the entire SHV magmatic system using an integrated array of specialized instruments in four strategically located ~200-m-deep boreholes in concert with several shallower holes and surface sites. The project is unique, as it represents the first, and only, such borehole volcano-monitoring array deployed at an andesitic stratovolcano. CALIPSO may be considered as a prototype for planned Plate Boundary Observatory (PBO) installations at several volcanic targets in the western United States. Scientific objectives of the EarthScope Integrated Science Plan (ES-ISP) relevant to magmatic systems are to investigate (1) melt generation in the mantle; (2) melt migration from the mantle to and through the crust to the surface; (3) melt residence times at various deep reservoirs; and (4) delineation of characteristic patterns of surface deformation and seismicity, which may prove useful in eruption forecasting. The CALIPSO project shares most of the same scientific goals and has, moreover, the benefit of a rich existing geophysical context in its deployment at SHV. Our experience during instrument design, planning, drilling and installation, systems integration, and early operation of CALIPSO, moreover, may prove valuable to EarthScope and PBO managers.

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petrosky, Charles E.; Holubetz, Terry B.

    The Idaho Department of Fish and Game has been monitoring and evaluating existing and proposed habitat improvement projects for steelhead (Salmo gairdneri) and chinook salmon (Oncorhynchus tshawytscha) in the Clearwater and Salmon River drainages over the last four years. Projects included in the evaluation are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia rivers. A mitigation record is being developed to use increased smolt production at full seeding as the best measure of benefit from a habitat enhancementmore » project. Determination of full benefit from a project depends on presence of adequate numbers of fish to document actual increases in fish production. The depressed nature of upriver anadromous stocks have precluded attainment of full benefit of any habitat project in Idaho. Partial benefit will be credited to the mitigation record in the interim period of run restoration. According to the BPA Work Plan, project implementors have the primary responsibility for measuring physical habitat and estimating habitat change. To date, Idaho habitat projects have been implemented primarily by the US Forest Service (USFS). The Shoshone-Bannock Tribes (SBT) have sponsored three projects (Bear Valley Mine, Yankee Fork, and the proposed East Fork Salmon River projects). IDFG implemented two barrier-removal projects (Johnson Creek and Boulder Creek) that the USFS was unable to sponsor at that time. The role of IDFG in physical habitat monitoring is primarily to link habitat quality and habitat change to changes in actual, or potential, fish production. Individual papers were processed separately for the data base.« less

  15. Monitoring Space Radiation Hazards with the Responsive Environmental Assessment Commercially Hosted (REACH) Project

    NASA Astrophysics Data System (ADS)

    Mazur, J. E.; Guild, T. B.; Crain, W.; Crain, S.; Holker, D.; Quintana, S.; O'Brien, T. P., III; Kelly, M. A.; Barnes, R. J.; Sotirelis, T.

    2017-12-01

    The Responsive Environmental Assessment Commercial Hosting (REACH) project uses radiation dosimeters on a commercial satellite constellation in low Earth orbit to provide unprecedented spatial and time sampling of space weather radiation hazards. The spatial and time scales of natural space radiation environments coupled with constraints for the hosting accommodation drove the instrumentation requirements and the plan for the final orbital constellation. The project has delivered a total of thirty two radiation dosimeter instruments for launch with each instrument containing two dosimeters with different passive shielding and electronic thresholds to address proton-induced single-event effects, vehicle charging, and total ionizing dose. There are two REACH instruments currently operating with four more planned for launch by the time of the 2017 meeting. Our aim is to field a long-lived system of highly-capable radiation detectors to monitor the hazards of single-event effects, total ionizing dose, and spacecraft charging with maximized spatial coverage and with minimal time latency. We combined a robust detection technology with a commercial satellite hosting to produce a new demonstration for satellite situational awareness and for other engineering and science applications.

  16. Preliminary monitoring protocol for the tidal freshwater wetland restoration herbivory study in national capital parks--east: Appendix B

    USGS Publications Warehouse

    Krafft, Cairn; Hatfield, Jeffrey S.

    2014-01-01

    Four tidal freshwater wetland restoration projects have been undertaken within Anacostia Park on lands managed by the National Park Service since 1993. Monitoring the impacts of Canada goose (Branta canadensis) herbivory on the wetland vegetation will play a key role in determining the long-term health of these tidal freshwater wetland restorations. This Implementation Plan lays out monitoring for impacts of herbivory on the vegetation in Kingman Area 1 and inferred to the other wetland areas.

  17. Advanced Ground Systems Maintenance Prognostics Project

    NASA Technical Reports Server (NTRS)

    Perotti, Jose M.

    2015-01-01

    The project implements prognostics capabilities to predict when a component system or subsystem will no longer meet desired functional or performance criteria, called the end of life. The capability also provides an assessment of the remaining useful life of a hardware component. The project enables the delivery of system health advisories to ground system operators. This project will use modeling techniques and algorithms to assess components' health andpredict remaining life for such components. The prognostics capability being developed will beused:during the design phase and during pre/post operations to conduct planning and analysis ofsystem design, maintenance & logistics plans, and system/mission operations plansduring real-time operations to monitor changes to components' health and assess their impacton operations.This capability will be interfaced to Ground Operations' command and control system as a part ofthe AGSM project to help assure system availability and mission success. The initial modelingeffort for this capability will be developed for Liquid Oxygen ground loading applications.

  18. Continued monitoring of instrumented pavement in Ohio : research implementation plan.

    DOT National Transportation Integrated Search

    2006-02-01

    Beginning in 1992, the Ohio Department of Transportation has sponsored several research projects to measure the : response of various highway pavement structures over a range of environmental and loading conditions. Much of : these response data were...

  19. Continued Monitoring of Instrumented Pavement in Ohio : Research Implementation Plan

    DOT National Transportation Integrated Search

    2006-02-14

    Beginning in 1992, the Ohio Department of Transportation has sponsored several research projects to measure the response of various highway pavement structures over a range of environmental and loading conditions. Much of these response data were col...

  20. Data-driven freeway performance evaluation framework for project prioritization and decision making.

    DOT National Transportation Integrated Search

    2017-01-01

    This report describes methods that potentially can be incorporated into the performance monitoring and planning processes for freeway performance evaluation and decision making. Reliability analysis was conducted on the selected I-15 corridor by empl...

  1. Data-driven freeway performance evaluation framework for project prioritization and decision making.

    DOT National Transportation Integrated Search

    2015-03-01

    This report describes methods that potentially can be incorporated into the performance monitoring and planning : processes for freeway performance evaluation and decision making. Reliability analysis is conducted on the selected : I-15 corridor by e...

  2. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Childs, Allen B.

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Yearmore » Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Rainwater project is much more than a wildlife project--it is a watershed project with potential to benefit resources at the watershed scale. Goals and objectives presented in the following sections include both mitigation and non-mitigation related goals and objectives.« less

  3. Proposal and work plan to calibrate and verify a water-quality model to simulate effects of wastewater discharges to the Red River of the North at drought streamflow near Fargo, North Dakota, and Moorhead, Minnesota

    USGS Publications Warehouse

    Wesolowski, Edwin A.

    2000-01-01

    This report presents a proposal for conducting a water-quality modeling study at drought streamflow, a detailed comprehensive plan for collecting the data, and an annual drought-formation monitoring plan. A 30.8 mile reach of the Red River of the North receives treated wastewater from plants at Fargo, North Dakota, and Moorhead, Minnesota, and streamflow from the Sheyenne River. The water-quality modeling study will evaluate the effects of continuous treated-wastewater discharges to the study reach at drought streamflow. The study will define hydraulic characteristics and reaeration and selected reaction coefficients and will calibrate and verity a model.The study includes collecting synoptic water-quality samples for various types of analyses at a number of sites in the study reach. Dye and gas samples will be collected for traveltime and reaeration measurements. Using the Lagrangian reference frame, synoptic water-quality samples will be collected for analysis of nutrients, chlorophyll a, alkalinity, and carbonaceous biochemical oxygen demand. Field measurements will be made of specific conductance, pH, air and water temperature, dissolved oxygen, and sediment oxygen demand. Two sets of water-quality data will be collected. One data set will be used to calibrate the model, and the other data set will be used to verity the model.The DAFLOW/BLTM models will be used to evaluate the effects of the treated wastewater on the water quality of the river. The model will simulate specific conductance, temperature, dissolved oxygen, carbonaceous biochemical oxygen demand, total nitrogen (organic, ammonia, nitrite, nitrate), total orthophosphorus, total phosphorus, and phytoplankton as chlorophyll a.The work plan identifies and discusses the work elements needed for accomplishing the data collection for the study. The work elements specify who will provide personnel, vehicles, instruments, and supplies needed during data collection. The work plan contains instructions for data collection; inventory lists of needed personnel, vehicles, instruments, and supplies; and examples of computations for determining quantities of tracer to be injected into the stream. The work plan also contains an annual drought-formation monitoring plan that includes a 9-month time line that specifies when essential planning actions must occur before actual project start up. Drought streamflows are rare. The annual drought-formation monitoring plan is presented to assist project planning by providing early warning that conditions are favorable to produce drought streamflow. The plan to monitor drought-forming conditions discusses the drought indices to be monitored. To establish a baseline, historic values for some of the drought indices for selected years were reviewed. An annual review of the drought indices is recommended.

  4. Evaluating barnyard Best Management Practices in Wisconsin using upstream-downstream monitoring

    USGS Publications Warehouse

    Stuntebeck, Todd D.

    1995-01-01

    The Nonpoint Source Water Pollution Abatement Program was created in 1978 by the Wisconsin Legislature. The goal of the program is to improve and protect the water quality of lakes, streams, wetlands, and ground water within selected priority watersheds by controlling sources of nonpoint pollution. For each selected watershed, the Wisconsin Department of Natural Resources drafts a management plan that guides the implementation of pollution-control strategies known as Best Management Practices (BMP's). This plan summarizes resource and land-use inventories, describes the results of pollution-source modeling, and suggests pollution reduction goals. The U.S. Geological Survey, through a cooperative effort with the Wisconsin Department of Natural Resources, is monitoring water-quality improvements that result from the implementation of BMP's. The data collected are then compared to the watershed plans to assess progress and determine whether goals are being realized. This fact sheet describes the data-collection efforts, preliminary results, and planned data-analysis techniques of monitoring projects for pre-BMP conditions at two barnyards, one each on Otter Creek and Halfway Prairie Creek.

  5. Social Impact Management Plans: Innovation in corporate and public policy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Franks, Daniel M., E-mail: d.franks@uq.edu.au; Vanclay, Frank, E-mail: frank.vanclay@rug.nl

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples aremore » analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community. • SIMPs link assessment to ongoing management and address social and community issues. • SIMPs clarify responsibilities in the management of impacts, opportunities and risks. • SIMPs demonstrate a shift to include management as a core component of SIA practice.« less

  6. Planning riparian restoration in the context of tamarix control in Western North America

    USGS Publications Warehouse

    Shafroth, P.B.; Beauchamp, Vanessa B.; Briggs, M.K.; Lair, K.; Scott, M.L.; Sher, A.A.

    2008-01-01

    Throughout the world, the condition of many riparian ecosystems has declined due to numerous factors, including encroachment of non-native species. In the western United States, millions of dollars are spent annually to control invasions of Tamarix spp., introduced small trees or shrubs from Eurasia that have colonized bottomland ecosystems along many rivers. Resource managers seek to control Tamarix in attempts to meet various objectives, such as increasing water yield and improving wildlife habitat. Often, riparian restoration is an implicit goal, but there has been little emphasis on a process or principles to effectively plan restoration activities, and many Tamarix removal projects are unsuccessful at restoring native vegetation. We propose and summarize the key steps in a planning process aimed at developing effective restoration projects in Tamarix-dominated areas. We discuss in greater detail the biotic and abiotic factors central to the evaluation of potential restoration sites and summarize information about plant communities likely to replace Tamarix under various conditions. Although many projects begin with implementation, which includes the actual removal of Tamarix, we stress the importance of pre-project planning that includes: (1) clearly identifying project goals; (2) developing realistic project objectives based on a detailed evaluation of site conditions; (3) prioritizing and selecting Tamarix control sites with the best chance of ecological recovery; and (4) developing a detailed tactical plan before Tamarix is removed. After removal, monitoring and maintenance as part of an adaptive management approach are crucial for evaluating project success and determining the most effective methods for restoring these challenging sites. ?? 2008 Society for Ecological Restoration International.

  7. The NASA/Army Autonomous Rotorcraft Project

    NASA Technical Reports Server (NTRS)

    Whalley, M.; Freed, M.; Takahashi, M.; Christian, D.; Patterson-Hine, A.; Schulein, G.; Harris, R.

    2002-01-01

    An overview of the NASA Ames Research Center Autonomous Rotorcraft Project (ARP) is presented. The project brings together several technologies to address NASA and US Army autonomous vehicle needs, including a reactive planner for mission planning and execution, control system design incorporating a detailed understanding of the platform dynamics, and health monitoring and diagnostics. A candidate reconnaissance and surveillance mission is described. The autonomous agent architecture and its application to the candidate mission are presented. Details of the vehicle hardware and software development are provided.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Diefenderfer, Heida L.

    This annual report is a deliverable for fiscal year 2007 (FY07) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort of the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbiamore » River and estuary. In FY07, EOS project accomplishments included (1) subgroup meetings; (2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via the project tracking system, PISCES; (4) quarterly project status reports; and (5) a major revision to the Estuary RME Plan (new version September 2007) based on comments by EOS members and invited reviewers.« less

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Diefenderfer, Heida L.

    This annual report is a deliverable for fiscal year 2007 (FY07) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia Rivermore » and estuary. In FY07, EOS project accomplishments included 1) subgroup meetings; 2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, PISCES; 4) quarterly project status reports; and 5) a major revision to the Estuary RME Plan (new version September 2007) based on comments by EOS members and invited reviewers.« less

  10. Reducing Risk for the Next Generation Nuclear Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John M. Beck II; Harold J. Heydt; Emmanuel O. Opare

    2010-07-01

    The Next Generation Nuclear Plant (NGNP) Project, managed by the Idaho National Laboratory (INL), is directed by the Energy Policy Act of 2005, to research, develop, design, construct, and operate a prototype forth generation nuclear reactor to meet the needs of the 21st Century. As with all large projects developing and deploying new technologies, the NGNP has numerous risks that need to be identified, tracked, mitigated, and reduced in order for successful project completion. A Risk Management Plan (RMP) was created to outline the process the INL is using to manage the risks and reduction strategies for the NGNP Project.more » Integral to the RMP is the development and use of a Risk Management System (RMS). The RMS is a tool that supports management and monitoring of the project risks. The RMS does not only contain a risk register, but other functionality that allows decision makers, engineering staff, and technology researchers to review and monitor the risks as the project matures.« less

  11. Developing a Long-term Monitoring Program with Undergraduate Students in Marine Sciences

    NASA Astrophysics Data System (ADS)

    Anders, T. M.; Boryta, M. D.

    2015-12-01

    A goal of our growing marine geoscience program at Mt. San Antonio College is to involve our students in all stages of developing and running an undergraduate research project. During the initial planning phase, students develop and test their proposals. Instructor-set parameters were chosen carefully to help guide students toward manageable projects but to not limit their creativity. Projects should focus on long-term monitoring of a coastal area in southern California. During the second phase, incoming students will critique the initial proposals, modify as necessary and continue to develop the project. We intend for data collection opportunities to grow from geological and oceanographic bases to eventually include other STEM topics in biology, chemistry, math and GIS. Questions we will address include: What makes this a good research project for a community college? What are the costs and time commitments involved? How will the project benefit students and society? Additionally we will share our initial results, challenges, and unexpected pitfalls and benefits.

  12. Application of remote sensing to state and regional problems. [for Mississippi

    NASA Technical Reports Server (NTRS)

    Miller, W. F.; Bouchillon, C. W.; Harris, J. C.; Carter, B.; Whisler, F. D.; Robinette, R.

    1974-01-01

    The primary purpose of the remote sensing applications program is for various members of the university community to participate in activities that improve the effective communication between the scientific community engaged in remote sensing research and development and the potential users of modern remote sensing technology. Activities of this program are assisting the State of Mississippi in recognizing and solving its environmental, resource and socio-economic problems through inventory, analysis, and monitoring by appropriate remote sensing systems. Objectives, accomplishments, and current status of the following individual projects are reported: (1) bark beetle project; (2) state park location planning; and (3) waste source location and stream channel geometry monitoring.

  13. Toward an expert project management system

    NASA Technical Reports Server (NTRS)

    Silverman, Barry G.; Murray, Arthur; Diakite, Coty; Feggos, Kostas

    1987-01-01

    The purpose of the research effort is to prescribe a generic reusable shell that any project office can install and customize for the purposes of advising, guiding, and supporting project managers in that office. The prescribed shell is intended to provide both: a component that generates prescriptive guidance for project planning and monitoring activities, and an analogy (intuition) component that generates descriptive insights of previous experience of successful project managers. The latter component is especially significant in that it has the potential to: retrieve insights, not just data, and provide a vehicle for expert PMs to easily transcribe their current experiences in the course of each new project managed.

  14. Understanding user needs for carbon monitoring information

    NASA Astrophysics Data System (ADS)

    Duren, R. M.; Macauley, M.; Gurney, K. R.; Saatchi, S. S.; Woodall, C. W.; Larsen, K.; Reidmiller, D.; Hockstad, L.; Weitz, M.; Croes, B.; Down, A.; West, T.; Mercury, M.

    2015-12-01

    The objectives of the Understanding User Needs project for NASA's Carbon Monitoring System (CMS) program are to: 1) engage the user community and identify needs for policy-relevant carbon monitoring information, 2) evaluate current and planned CMS data products with regard to their value for decision making, and 3) explore alternative methods for visualizing and communicating carbon monitoring information and associated uncertainties to decision makers and other stakeholders. To meet these objectives and help establish a sustained link between science and decision-making we have established a multi-disciplinary team that combines expertise in carbon-cycle science, engineering, economics, and carbon management and policy. We will present preliminary findings regarding emerging themes and needs for carbon information that may warrant increased attention by the science community. We will also demonstrate a new web-based tool that offers a common framework for facilitating user evaluation of carbon data products from multiple CMS projects.

  15. Data Management Plan and Functional System Design for the Information Management System of the Clinch River Remedial Investigation and Waste Area Grouping 6

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ball, T.; Brandt, C.; Calfee, J.

    1994-03-01

    The Data Management Plan and Functional System Design supports the Clinch River Remedial Investigation (CRRI) and Waste Area Grouping (WAG) 6 Environmental Monitoring Program. The objective of the Data Management Plan and Functional System Design is to provide organization, integrity, security, traceability, and consistency of the data generated during the CRRI and WAG 6 projects. Proper organization will ensure that the data are consistent with the procedures and requirements of the projects. The Information Management Groups (IMGs) for these two programs face similar challenges and share many common objectives. By teaming together, the IMGs have expedited the development and implementationmore » of a common information management strategy that benefits each program.« less

  16. Risk Management for Human Support Technology Development

    NASA Technical Reports Server (NTRS)

    jones, Harry

    2005-01-01

    NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.

  17. Deep Stimulation at Newberry Volcano EGS Demonstration

    NASA Astrophysics Data System (ADS)

    Grasso, K.; Cladouhos, T. T.; Petty, S.; Garrison, G. H.; Nordin, Y.; Uddenberg, M.; Swyer, M.

    2014-12-01

    The Newberry Volcano EGS Demonstration is a 5 year field project designed to demonstrate recent technological advances for engineered geothermal systems (EGS) development. Advances in reservoir stimulation, diverter, and monitoring are being tested in a hot (>300 C), dry well (NWG 55-29) drilled in 2008. These technologies could reduce the cost of electrical power generation. The project began in 2010 with two years of permitting, technical planning, and development of a project-specific Induced Seismicity Mitigation Plan (ISMP), and is funded in part by the Department of Energy. In 2012, the well was hydraulically stimulated with water at pressures below the principle stress for 7 weeks, resulting in hydroshearing. The depth of stimulation was successfully shifted by injection of two pills of Thermally-degradable Zonal Isolation Materials (TZIMs). Injectivity changes, thermal profiles and seismicity indicate that fracture permeability in well NWG 55-29 was enhanced during stimulation. This work successfully demonstrated the viability of large-volume (40,000 m3), low-pressure stimulation coupled with non-mechanical diverter technology, and microseismic monitoring for reservoir mapping. Further analysis and field testing in 2013 indicates further stimulation will be required in order to develop an economically viable reservoir, and is scheduled in 2014. The 2014 stimulation will use improved stimulation and monitoring equipment, better knowledge based on 2012 outcomes, and create a deep EGS reservoir in the hottest part of the wellbore.

  18. 7 CFR 275.19 - Monitoring and evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action § 275.19... Project Area/Management Unit Corrective Action Plan is implemented and achieves the anticipated results...

  19. Water quality facility investigation report : final summary of project and evaluation of monitoring plan implementation.

    DOT National Transportation Integrated Search

    2005-07-05

    The Oregon Department of Transportation (ODOT) has installed several stormwater : treatment facilities throughout the State to improve the quality of runoff discharged from : highways. These facilities include a variety of both above ground and below...

  20. Special Advanced Studies for Pollution Prevention. Delivery Order 0058: The Monitor - Spring 2000

    DTIC Science & Technology

    2001-04-01

    Process complexity ➨ Strippability ➨ Maturity ➨ Process type and chemistry ➨ Licensing requirements ➨ Vendor information ➨ Niplate 700 (Surface...Courses of Action 4 Identify & Evaluate Potential Alternatives 5 Select Best Alternative & Develop Project 6 Prioritize Projects by Commodity 7 Rank...Burden CS Priority Process Specific P2 OASolution Selection Solution Planning Solution Implementation Solution Evaluation Phase 2 Phase 3 Phase 1

  1. The Fermilab Isdn Pilot Project: Experiences and Future Plans

    NASA Astrophysics Data System (ADS)

    Martin, D. E.; Lego, A. J.; Clifford, A. E.

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen users were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. Each home was equipped with a basic rate ISDN (BRI) line, a BRI Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking.

  2. PCDD, PCDF, dl-PCB and organochlorine pesticides monitoring in São Paulo City using passive air sampler as part of the Global Monitoring Plan.

    PubMed

    Tominaga, M Y; Silva, C R; Melo, J P; Niwa, N A; Plascak, D; Souza, C A M; Sato, M I Z

    2016-11-15

    The persistent organic pollutants (POPs), such as organochlorine pesticides and PCBs, are ordinarily monitored in the aquatic environment or in soil in the environmental quality monitoring programs in São Paulo, Brazil. One of the core matrices proposed in the POPs Global Monitoring Plan (GMP) from the Stockholm Convention list is the ambient air, which is not a usual matrix for POPs monitoring in the country. In this study POP levels were evaluated in the air samples from an urban site in São Paulo City over five years, starting in 2010 as a capacity building project for Latin America and the Caribbean region for POP monitoring in ambient air using passive samplers. Furthermore, after the end of the Project in 2012, the monitoring continued in the same sampling site as means to improving the analytical capacity building and contribute to the GMP data. The POPs monitored were 17 congeners of 2,3,7,8 chloro-substituted PCDDs and PCDFs, dioxin-like PCBs, indicator PCBs, organochlorine pesticides and toxaphene. The results show a slight decrease in PCDD/F, dl-PCBs and indicator PCBs levels along the five years. The organochlorine pesticide endosulfan was present at its highest concentration at the beginning of the monitoring period, but it was below detection level in the last year of the monitoring. Some other organochlorine pesticides were detected close to or below quantitation limits. The compounds identified were dieldrin, chlordane, α-HCH, γ-HCH, heptachlor, heptachlor epoxide, hexachlorobenzene and DDTs. Toxaphene congeners were not detected. These results have confirmed the efficacy of passive sampling for POP monitoring and the capacity building for POP analysis and monitoring was established. However more needs to be done, including expansion of sampling sites, new POPs and studies on sampling rates to be considered in calculating the concentration of POPs in ambient air using a passive sampler. Copyright © 2016 Elsevier B.V. All rights reserved.

  3. Section 107 Detailed Project Report. Fort Gaines Channel (Government Cut) at Dauphin Island, Alabama

    DTIC Science & Technology

    1990-03-01

    Engineer District, Mobile AREA &WORK UNIT NUMBERS Plan Dev. Sec., Planning Div., (CESAM-PD-FP)- P. 0. Box 2-288, Mobi,L.3.a6628-OO.....,__ 11I...C’ONTAOLLING OFFICE NAME AND ADDRESS M 2 REPORT DATE US. Army Engineer District, Mobile March 1990 Pian Development Sec., Plan. Div., (CESAM-PD-FP) 13 NUMBER...OF PAGES P- 0. Box 2288, Mobile , AL 36628-0001 162 t4. MONITORING AGENCY NAME & ADORESS(11 different from Controlling Office) 15. SECURITY CLASS. (ol

  4. NICA project management information system

    NASA Astrophysics Data System (ADS)

    Bashashin, M. V.; Kekelidze, D. V.; Kostromin, S. A.; Korenkov, V. V.; Kuniaev, S. V.; Morozov, V. V.; Potrebenikov, Yu. K.; Trubnikov, G. V.; Philippov, A. V.

    2016-09-01

    The science projects growth, changing of the efficiency criteria during the project implementation require not only increasing of the management specialization level but also pose the problem of selecting the effective planning methods, monitoring of deadlines and interaction of participants involved in research projects. This paper is devoted to choosing the project management information system for the new heavy-ion collider NICA (Nuclotron based Ion Collider fAcility). We formulate the requirements for the project management information system with taking into account the specifics of the Joint Institute for Nuclear Research (JINR, Dubna, Russia) as an international intergovernmental research organization, which is developed on the basis of a flexible and effective information system for the NICA project management.

  5. Application of remote sensing to state and regional problems

    NASA Technical Reports Server (NTRS)

    Miller, W. F.; Clark, J. R.; Solomon, J. L.; Duffy, B.; Minchew, K.; Wright, L. H. (Principal Investigator)

    1981-01-01

    The objectives, accomplishments, and future plans of several LANDSAT applications projects in Mississippi are discussed. The applications include land use planning in Lowandes County, strip mine inventory and reclamation, white tailed deer habitat evaluation, data analysis support systems, discrimination of forest habitats in potential lignite areas, changes in gravel operations, and determination of freshwater wetlands for inventory and monitoring. In addition, a conceptual design for a LANDSAT based information system is discussed.

  6. A Project to Develop a Marketing Plan for Dwight David Eisenhower Health Service Region by Audit

    DTIC Science & Technology

    1991-04-01

    1986), and Zikmund & D’Amico (1986). All four marketing scholars, including Kotler (1984), reference to Philip Kotler’s selected component format (see...motivate both negative and positive behavior in publics can be considered a critical factor in health care service delivery ( Kotler , & Clarke, 1987...monitoring of communicated information is the institution of a marketing plan within the organization ( Kotler & Clarke, 1987). MARKETING Within the

  7. 34 CFR 403.32 - What must the State plan contain?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAM How... participate in the programs authorized under the State Vocational and Applied Technology Program, the State... monitoring of projects, services, and activities conducted by eligible recipients to ensure that the eligible...

  8. 34 CFR 403.32 - What must the State plan contain?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAM How... participate in the programs authorized under the State Vocational and Applied Technology Program, the State... monitoring of projects, services, and activities conducted by eligible recipients to ensure that the eligible...

  9. 77 FR 8804 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ..., is frequently used to monitor the business cycle. This survey provides an essential component of the... planning and analysis to business firms, trade associations, research and consulting agencies, and academia... project future movements in manufacturing activity. These statistics are valuable for analysts of business...

  10. 34 CFR 403.32 - What must the State plan contain?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAM How... participate in the programs authorized under the State Vocational and Applied Technology Program, the State... monitoring of projects, services, and activities conducted by eligible recipients to ensure that the eligible...

  11. 34 CFR 403.32 - What must the State plan contain?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAM How... participate in the programs authorized under the State Vocational and Applied Technology Program, the State... monitoring of projects, services, and activities conducted by eligible recipients to ensure that the eligible...

  12. 34 CFR 403.32 - What must the State plan contain?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAM How... participate in the programs authorized under the State Vocational and Applied Technology Program, the State... monitoring of projects, services, and activities conducted by eligible recipients to ensure that the eligible...

  13. Application of science-based restoration planning to a desert river system.

    PubMed

    Laub, Brian G; Jimenez, Justin; Budy, Phaedra

    2015-06-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  14. Application of Science-Based Restoration Planning to a Desert River System

    NASA Astrophysics Data System (ADS)

    Laub, Brian G.; Jimenez, Justin; Budy, Phaedra

    2015-06-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  15. Application of science-based restoration planning to a desert river system

    USGS Publications Warehouse

    Laub, Brian G.; Jimenez, Justin; Budy, Phaedra

    2015-01-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  16. Building the U.S. First Offshore Wind Farm-Applying EBM Approaches to Successfully Address Offshore Energy, Commercial Fisheries, and Recreational Boating interactions

    NASA Astrophysics Data System (ADS)

    Lipsky, A.

    2016-12-01

    In August 2015 construction commenced on the Block Island Wind Farm, the first offshore wind energy project in the U.S. This pilot-scale offshore energy project, located 18 miles offshore of the Rhode Island mainland, was sited through a comprehensive ocean planning process. As the project progressed into design and construction, our team utilized potent ecosystem based management approaches to great advantage to address the human and resource interactions that existed in the project area. These practices have included designing and executing collaborative long-term monitoring ventures to fill key science gaps and reconcile fisheries concerns, establishing effective industry to industry engagement, and developing durable multi-sector agreements. This presentation will describe the specific EBM approaches used after the planning process was completed to bring the project to construction; highlighting where key aspects of the National Ocean Policy goals and principles have been successfully applied.

  17. Building the U.S. First Offshore Wind Farm-Applying EBM Approaches to Successfully Address Offshore Energy, Commercial Fisheries, and Recreational Boating interactions

    NASA Astrophysics Data System (ADS)

    Lipsky, A.

    2016-02-01

    In August 2015 construction commenced on the Block Island Wind Farm, the first offshore wind energy project in the U.S. This pilot-scale offshore energy project, located 18 miles offshore of the Rhode Island mainland, was sited through a comprehensive ocean planning process. As the project progressed into design and construction, our team utilized potent ecosystem based management approaches to great advantage to address the human and resource interactions that existed in the project area. These practices have included designing and executing collaborative long-term monitoring ventures to fill key science gaps and reconcile fisheries concerns, establishing effective industry to industry engagement, and developing durable multi-sector agreements. This presentation will describe the specific EBM approaches used after the planning process was completed to bring the project to construction; highlighting where key aspects of the National Ocean Policy goals and principles have been successfully applied.

  18. ASI-Sistema Rischio Vulcanico SRV: a pilot project to develop EO data processing modules and products for volcanic activity monitoring based on Italian Civil Protection Department requirements and needs

    NASA Astrophysics Data System (ADS)

    Buongiorno, Maria Fabrizia; Musacchio, Massimo; Silvestri, Malvina; Spinetti, Claudia; Corradini, Stefano; Lombardo, Valerio; Merucci, Luca; Sansosti, Eugenio; Pugnagli, Sergio; Teggi, Sergio; Pace, Gaetano; Fermi, Marco; Zoffoli, Simona

    2007-10-01

    The Project called Sistema Rischio Vulcanico (SRV) is funded by the Italian Space Agency (ASI) in the frame of the National Space Plan 2003-2005 under the Earth Observations section for natural risks management. The SRV Project is coordinated by the Istituto Nazionale di Geofisica e Vulcanologia (INGV) which is responsible at national level for the volcanic monitoring. The objective of the project is to develop a pre-operative system based on EO data and ground measurements integration to support the volcanic risk monitoring of the Italian Civil Protection Department which requirements and need are well integrated in the GMES Emergency Core Services program. The project philosophy is to implement, by incremental versions, specific modules which allow to process, store and visualize through Web GIS tools EO derived parameters considering three activity phases: 1) knowledge and prevention; 2) crisis; 3) post crisis. In order to combine effectively the EO data and the ground networks measurements the system will implement a multi-parametric analysis tool, which represents and unique tool to analyze contemporaneously a large data set of data in "near real time". The SRV project will be tested his operational capabilities on three Italian Volcanoes: Etna,Vesuvio and Campi Flegrei.

  19. Hydrogeologic Modeling for Monitoring, Reporting and Verification of Geologic Sequestration

    NASA Astrophysics Data System (ADS)

    Kolian, M.; De Figueiredo, M.; Lisa, B.

    2011-12-01

    In December 2010, EPA finalized Subpart RR of the Greenhouse Gas (GHG) Reporting Program, which requires facilities that conduct geologic sequestration (GS) of carbon dioxide (CO2) to report GHG data to EPA annually. The GHG Reporting Program requires reporting of GHGs and other relevant information from certain source categories in the United States, and information obtained through Subpart RR will inform Agency decisions under the Clean Air Act related to the use of carbon dioxide capture and sequestration for mitigating GHGs. This paper examines hydrogeologic modeling necessities and opportunities in the context of Subpart RR. Under Subpart RR, facilities that conduct GS by injecting CO2 for long-term containment in subsurface geologic formations are required to develop and implement an EPA-approved site-specific monitoring, reporting, and verification (MRV) plan; and report basic information on CO2 received for injection, annual monitoring activities and the amount of CO2 geologically sequestered using a mass balance approach. The major components of the MRV plan include: identification of potential surface leakage pathways for CO2 and the likelihood, magnitude, and timing, of surface leakage of CO2 through these pathways; delineation of the monitoring areas; strategy for detecting and quantifying any surface leakage of CO2; and the strategy for establishing the expected baselines for monitoring CO2 surface leakage. Hydrogeologic modeling is an integral aspect of the design of an MRV plan. In order to prepare an adequate monitoring program that addresses site specific risks over the full life of the project the MRV plan must reflect the full spatial extent of the free phase CO2 over time. Facilities delineate the maximum area that the CO2 plume is predicted to cover and how monitoring can be phased in over this area. The Maximum Monitoring Area (MMA) includes the extent of the free phase CO2 plume over the lifetime of the project plus a buffer zone of one-half mile. The Active Monitoring Area (AMA) is the area that will be monitored over a specified time interval chosen by the reporter, which must be greater than one year. All of the area in the MMA will eventually be covered by one or more AMAs. This allows operators to phase in monitoring so that during any given time interval, only that part of the MMA in which surface leakage might occur needs to be monitored. EPA designed the MRV plan approach to be site-specific, flexible, and adaptive to future technology developments. This approach allows the reporter to leverage the site characterization, modeling, and monitoring approaches (e.g. monitoring of injection pressures, injection well integrity, groundwater quality and geochemistry, and CO2 plume location, etc.) developed for their Underground Injection Control (UIC) permit. UIC requirements provide the foundation for the safe sequestration of CO2 by helping to ensure that injected fluids remain isolated in the subsurface and away from underground sources of drinking water, thereby serving to reduce the risk of CO2 leakage to the atmosphere.

  20. FutureGen 2.0 Monitoring Program: An Overview of the Monitoring Approach and Technologies Selected for Implementation

    DOE PAGES

    Vermeul, Vince R.; Strickland, Chris E.; Thorne, Paul D.; ...

    2014-12-31

    The FutureGen 2.0 Project will design and build a first-of-its-kind, near-zero emissions coal-fueled power plant with carbon capture and storage (CCS). To assess storage site performance and meet the regulatory requirements of the Class VI Underground Injection Control (UIC) Program for CO2 Geologic Sequestration, the FutureGen 2.0 project will implement a suite of monitoring technologies designed to 1) evaluate CO2 mass balance and 2) detect any unforeseen loss in CO2 containment. The monitoring program will include direct monitoring of the injection stream and reservoir, and early-leak-detection monitoring directly above the primary confining zone. It will also implement an adaptive monitoringmore » strategy whereby monitoring results are continually evaluated and the monitoring network is modified as required, including the option to drill additional wells in out-years. Wells will be monitored for changes in CO2 concentration and formation pressure, and other geochemical/isotopic signatures that provide indication of CO2 or brine leakage. Indirect geophysical monitoring technologies that were selected for implementation include passive seismic, integrated surface deformation, time-lapse gravity, and pulsed neutron capture logging. Near-surface monitoring approaches that have been initiated include surficial aquifer and surface- water monitoring, soil-gas monitoring, atmospheric monitoring, and hyperspectral data acquisition for assessment of vegetation conditions. Initially, only the collection of baseline data sets is planned; the need for additional near- surface monitoring will be continually evaluated throughout the design and operational phases of the project, and selected approaches may be reinstituted if conditions warrant. Given the current conceptual understanding of the subsurface environment, early and appreciable impacts to near-surface environments are not expected.« less

  1. Conceptual Framework and Guidelines for Establishing Geographic Information Systems Capable of Integrating Natural Resources Data and Socio-Economic Data for Development-Oriented Planning, Monitoring and Research. (Preliminary Version).

    ERIC Educational Resources Information Center

    de Man, W. H. Erik, Ed.

    This preliminary conceptual framework and the 23 related guidelines have been prepared by specialists drawn from both developed and developing nations as a joint project of the International Institute for Aerial Survey and Earth Sciences (ITC). The project was designed to analyze linkages between natural resource based data and certain types of…

  2. SU-E-T-605: Performance Evaluation of MLC Leaf-Sequencing Algorithms in Head-And-Neck IMRT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jing, J; Lin, H; Chow, J

    2015-06-15

    Purpose: To investigate the efficiency of three multileaf collimator (MLC) leaf-sequencing algorithms proposed by Galvin et al, Chen et al and Siochi et al using external beam treatment plans for head-and-neck intensity modulated radiation therapy (IMRT). Methods: IMRT plans for head-and-neck were created using the CORVUS treatment planning system. The plans were optimized and the fluence maps for all photon beams determined. Three different MLC leaf-sequencing algorithms based on Galvin et al, Chen et al and Siochi et al were used to calculate the final photon segmental fields and their monitor units in delivery. For comparison purpose, the maximum intensitymore » of fluence map was kept constant in different plans. The number of beam segments and total number of monitor units were calculated for the three algorithms. Results: From results of number of beam segments and total number of monitor units, we found that algorithm of Galvin et al had the largest number of monitor unit which was about 70% larger than the other two algorithms. Moreover, both algorithms of Galvin et al and Siochi et al have relatively lower number of beam segment compared to Chen et al. Although values of number of beam segment and total number of monitor unit calculated by different algorithms varied with the head-and-neck plans, it can be seen that algorithms of Galvin et al and Siochi et al performed well with a lower number of beam segment, though algorithm of Galvin et al had a larger total number of monitor units than Siochi et al. Conclusion: Although performance of the leaf-sequencing algorithm varied with different IMRT plans having different fluence maps, an evaluation is possible based on the calculated number of beam segment and monitor unit. In this study, algorithm by Siochi et al was found to be more efficient in the head-and-neck IMRT. The Project Sponsored by the Fundamental Research Funds for the Central Universities (J2014HGXJ0094) and the Scientific Research Foundation for the Returned Overseas Chinese Scholars, State Education Ministry.« less

  3. Hydrologic data and description of a hydrologic monitoring plan for Medicine Lake Volcano, California

    USGS Publications Warehouse

    Schneider, Tiffany Rae; McFarland, W.D.

    1996-01-01

    A hydrologic reconnaissance of the Medicine Lake Volcano area was done to collect data needed for the design of a hydrologic monitoring plan. The reconnaissance was completed during two field trips made in June and September 1992, during which geothermal and hydrologic features of public interest in the Medicine Lake area were identified. Selected wells, springs, and geothermal features were located and documented, and initial water-level, discharge, temperature, and specific-conductance measurements were made. Lakes in the study area also were surveyed during the September field trip. Temperature, specific- conductance, dissolved oxygen, and pH data were collected by using a multiparameter probe. The proposed monitoring plan includes measurement of water levels in wells, discharge from springs, and lake stage, as well as analysis of well-,spring-, and lake-water quality. In determining lake-water quality, data for both stratified and unstratified conditions would be considered. (Data for stratified conditions were collected during the reconnaissance phase of this project, but data for unstratified conditions were not.) In addition, lake stage also would be monitored. A geothermal feature near Medicine Lake is a "hot spot" from which hot gases discharge from two distinct vents. Gas chemistry and temperature would be monitored in one of these vents.

  4. McKenzie River Focus Watershed Coordination: Year-End Report 2000.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thrailkil, Jim

    2000-01-01

    This report summarizes accomplishments of the McKenzie River Focus Watershed Council (MWC) in the areas of coordination and administration during Fiscal Year 2000. Coordination and administration consist of prioritization and planning for projects; project management and implementation; procurement of funding for long-term support of the Council; and watershed education/outreach program for residents and local schools. Key accomplishments in the area of project planning include coordinating: monthly Council and executive committee meetings; staffing the Upper Willamette Spring Chinook Working Group; staffing the water quality technical committee; and guiding education and stewardship projects. Key accomplishments in the area of project management includemore » the completion of the McKenzie-Willamette Confluence Assessment; securing funds for project planning in the confluence area; near completion of the BPA funded McKenzie sub-basin assessment; development of a framework for a McKenzie Watershed Conservation Strategy; an evaluation of Council's monitoring programs - ambient water quality, storm-event water quality, Tier III water quality, and macroinvertebrate monitoring. The Council, in cooperation with the McKenzie River Cooperative, completed habitat enhancements in the Gate Creek and Deer Creek sub-watersheds. This partnership recently submitted Bring Back the Natives grant for initiation of projects in other McKenzie tributaries. The Council will also be working with a local business to develop a river-side riparian enhancement and native landscaping project on the lodge grounds. This will serve as a demonstration project for blending fish and wildlife habitat concerns with maintaining grounds for business opportunities. Accomplishments in the area of procurement of funding included developing the FY2000 Scope of Work and budget for approval by the Council and BPA; providing quarterly budget and work program progress reports to the Council; and securing additional funding from Council partner organizations and foundations. Highlights in the area of watershed education/outreach include the MWC's lead role in convening the Watershed Education Network for teachers as part of its educational mission; production of newsletters and brochures; and coordination of media coverage of watershed-related issues.« less

  5. Development and implementation of a GEOGLAM Crop Monitor web interface

    NASA Astrophysics Data System (ADS)

    Oliva, P.; Sanchez, A.; Humber, M. L.; Becker-Reshef, I.; Justice, C. J.; McGaughey, K.; Barker, B.

    2016-12-01

    Beginning in September 2013, the GEOGLAM Crop Monitor activity has provided earth observation (EO) data to a network of partners and collected crop assessments on a subnational basis through a web interface known as the Crop Assessment Tool. Based on the collection of monthly crop assessments, a monthly crop condition bulletin is published in the Agricultural Market Information System (AMIS) Market Monitor report. This workflow has been successfully applied to food security applications through the Early Warning Crop Monitor activity. However, a lack of timely and accurate information on crop conditions and prospects at the national scale is a critical issue in the majority of southern and eastern African countries and some South American countries. Such information is necessary for informed and prompt decision making in the face of emergencies, food insecurity and planning requirements for agricultural markets. This project addresses these needs through the development of relevant, user-friendly remote sensing monitor systems, collaborative internet technology, and collaboration with national and regional agricultural monitoring networks. By building on current projects and relationships established through the various GEOGLAM Crop Monitor activities, this project aims to ultimately provide EO-informed crop condition maps and charts designed for economics and policy oriented audiences, thereby providing quick and easy to understand products on crop conditions as the season progresses. Integrating these data and assessments vertically throughout the system provides a basis for regional sharing and collaboration in food security applications.

  6. Applied Remote Sensing Program (ARSP)

    NASA Technical Reports Server (NTRS)

    Johnson, J. D.; Foster, K. E.; Mouat, D. A.; Miller, D. A.; Conn, J. S.

    1976-01-01

    The activities and accomplishments of the Applied Remote Sensing Program during FY 1975-1976 are reported. The principal objective of the Applied Remote Sensing Program continues to be designed projects having specific decision-making impacts as a principal goal. These projects are carried out in cooperation and collaboration with local, state and federal agencies whose responsibilities lie with planning, zoning and environmental monitoring and/or assessment in the application of remote sensing techniques. The end result of the projects is the use by the involved agencies of remote sensing techniques in problem solving.

  7. Classification management plan of groundwater quality in Taiwan

    NASA Astrophysics Data System (ADS)

    Chen, Chun Ming; Chen, Yu Ying; Pan, Shih Cheng; Li, Hui Jun; Hsiao, Fang Ke

    2017-04-01

    Taiwan Environmental Protection Administration has been monitoring regional water quality for 14 years. Since the beginning of 2002 till now, there are 453 regional groundwater monitoring wells in ten groundwater subregions in Taiwan, and the monitoring of groundwater quality has been carried out for a long time. Currently, water quality monitoring project has reached 50 items, while the number of water quality monitoring data has reached more than 20,000. In order to use the monitoring data efficiently, this study constructed the localized groundwater quality indicators of Taiwan. This indicator takes into account the different users' point of view, incorporating the Taiwan groundwater pollution monitoring standards (Category II), irrigation water quality standard and drinking water source water quality standard. 50 items of water quality monitoring projects were simplified and classified. The groundwater quality parameters were divided into five items, such as potability for drinking water, salting, external influence, health influences and toxicity hazard. The weight of the five items of groundwater was calculated comprehensively, and the groundwater quality of each monitoring well was evaluated with three grades of good, ordinary, and poor. According to the monitoring results of the groundwater monitoring wells in October to December of 2016, about 70% of groundwater quality in Taiwan is in good to ordinary grades. The areas with poor groundwater quality were mostly distributed in coastal, agriculture and part of the urban areas. The conductivity or ammonia nitrogen concentration was higher in those regions, showing that groundwater may be salinized or affected by external influences. Groundwater quality indicators can clearly show the current comprehensive situation of the groundwater environment in Taiwan and can be used as a tool for groundwater quality classification management. The indicators can coordinate with the Taiwan land planning policy in the future, and will be able to effectively grasp the changes of the national sub-regional environmental resources, which can serve as one of the important references in national land zoning according to environmental resources. Keywords: Groundwater Quality Indicators, Groundwater Quality Classification management

  8. Notification: Audit of Region 7’s Superfund Technical Assessment and Response Team (START) Contract

    EPA Pesticide Factsheets

    Project #OA-FY14-0354, July 21, 2014. The EPA OIG plans to begin the preliminary research phase of an audit evaluating Region 7's monitoring for compliance under its Superfund Technical Assessment and Response Team (START) contract (EPS71306).

  9. Five secrets to leveraging maximum buying power with your media project.

    PubMed

    Hirsch, Lonnie

    2010-11-01

    Planning and executing a successful media campaign or project requires knowledge and expert execution of specific techniques and skills, including understanding of the requirements for proper media research and competitive intelligence, effective planning of media schedules, negotiation of best rates with media companies, monitoring the campaign, accurately tracking and evaluating results, and making smart adjustments based on tracking data to maximize the profitability and success of the enterprise. Some of the most important knowledge and techniques are not generally known by most advertisers, particularly small businesses like health care practices. This article reveals these tips that are the most effective and includes information on the use of experts and other professional resources that help increase the likelihood of a successful outcome for a well-planned and executed media campaign. Copyright © 2010 Elsevier Inc. All rights reserved.

  10. TPS In-Flight Health Monitoring Project Progress Report

    NASA Technical Reports Server (NTRS)

    Kostyk, Chris; Richards, Lance; Hudston, Larry; Prosser, William

    2007-01-01

    Progress in the development of new thermal protection systems (TPS) is reported. New approaches use embedded lightweight, sensitive, fiber optic strain and temperature sensors within the TPS. Goals of the program are to develop and demonstrate a prototype TPS health monitoring system, develop a thermal-based damage detection algorithm, characterize limits of sensor/system performance, and develop ea methodology transferable to new designs of TPS health monitoring systems. Tasks completed during the project helped establish confidence in understanding of both test setup and the model and validated system/sensor performance in a simple TPS structure. Other progress included complete initial system testing, commencement of the algorithm development effort, generation of a damaged thermal response characteristics database, initial development of a test plan for integration testing of proven FBG sensors in simple TPS structure, and development of partnerships to apply the technology.

  11. Enhancing The National Map Through Tactical Planning and Performance Monitoring

    USGS Publications Warehouse

    ,

    2008-01-01

    Tactical planning and performance monitoring are initial steps toward improving 'the way The National Map works' and supporting the U.S. Geological Survey (USGS) Science Strategy. This Tactical Performance Planning Summary for The National Map combines information from The National Map 2.0 Tactical Plan and The National Map Performance Milestone Matrix. The National Map 2.0 Tactical Plan is primarily a working document to guide The National Map program's execution, production, and metrics monitoring for fiscal years (FY) 2008 and 2009. The Tactical Plan addresses data, products, and services, as well as supporting and enabling activities. The National Map's 2-year goal for FY 2008 and FY 2009 is to provide a range of geospatial products and services that further the National Spatial Data Infrastructure and underpin USGS science. To do this, the National Geospatial Program will develop a renewed understanding during FY 2008 of key customer needs and requirements, develop the infrastructure to support The National Map business model, modernize its business processes, and reengineer its workforce. Priorities for The National Map will be adjusted if necessary to respond to changes to the project that may impact resources, constrain timeframes, or change customer needs. The supporting and enabling activities that make it possible to produce the products and services of The National Map will include partnership activities, improved compatibility of systems, outreach, and integration of data themes.

  12. Wetland restoration and birds: lessons from Florida, San Francisco Bay, and Chesapeake Bay

    USGS Publications Warehouse

    Erwin, R.M.; Frederick, P.C.

    2005-01-01

    Many wetland restoration projects are underway across the North American landscape, ranging from small, community - based projects of less than 1 ha, to thousands of ha, as in San Francisco Bay or the Everglades. The goals of small projects are generally focused on replanting and sustaining native wetland vegetation, while larger projects often incorporate populations of birds and other vertebrates as part of the criteria for 'success.' Here, I use examples from a number of larger restoration projects from Florida, San Francisco Bay, and Chesapeake Bay, to illustrate several major challenges in planning and implementing those parts of the projects that include waterbirds. These include: (1) setting species priorities at the onset of the project, (2) negotiating among various stakeholders the goals that support wetland ecosystem structural elements (i.e. species and communities) versus those more functionally driven, (3) monitoring reproductive and survival parameters, as well as abundance, to avoid 'sink' situations, and (4) rationalizing control measures for opportunistic species that are not part of the restoration plan. Such projects often provide an ideal setting for the application of adaptive management, but long-term data management and oversight are required to ensure that project 'success' (or failure) is not short-term only.

  13. Foreign Humanitarian Assistance/Disaster Relief Operations Planning

    DTIC Science & Technology

    2006-05-15

    NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) Navy Warfare Development Command (NWDC),ATTN: N5,686 Cushing Road (Sims Hall),Newport,RI...Operations Planning 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT...02841-1207 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM( S ) 11

  14. A Closed-Cycle Optical Cryostat and Improved Optical Elements for Studies of Dissipation at the Molecular Scale

    DTIC Science & Technology

    2016-02-05

    diode laser, Raman spectroscopy REPORT DOCUMENTATION PAGE 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 10. SPONSOR/MONITOR’S ACRONYM(S) ARO 8...this project supported the acquisition of a closed-cycle optical cryostat from Montana Instruments, as well as a new 785 nm diode laser and ultrahigh...planned experiments on inelastic electron tunneling spectroscopy that require TɝK for optimal resolution. Additionally, the spatial position of

  15. Ecological Monitoring and Compliance Program Fiscal Year 2002 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. A. Wills

    2002-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada (BN) during fiscal year 2002. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species andmore » important biological resources were conducted for 26 NTS projects. These projects have the potential to disturb a total of 374 acres. Thirteen of the projects were in desert tortoise habitat, and 13.38 acres of desert tortoise habitat were disturbed. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed at project areas or along paved roads. Compilation of historical wildlife data continued this year in efforts to develop faunal distribution maps for the NTS. Photographs associated with the NTS ecological landform units sampled to create the NTS vegetation maps were cataloged for future retrieval and analysis. The list of sensitive plant species for which long-term population monitoring is scheduled was revised. Six vascular plants and five mosses were added to the list. Plant density estimates from ten populations of Astragalus beatleyae were collected, and eight known populations of Eriogonum concinnum were visited to assess plant and habitat status. Minimal field monitoring of western burrowing owl burrows occurred. A report relating to the ecology of the western burrowing owl on the Nevada Test Site was prepared which summarizes four years of data collected on this species' distribution, burrow use, reproduction, activity patterns, and food habits. Bat roost sites within seven buildings slated for demolition were identified, and a BN biologist was a contributing author of the Nevada Bat Conservation Plan published by the Nevada Bat Working Group. Thirty-three adult horses and five foals were counted this year. Six active raptor nests (two American kestrel, two Red-tailed hawk, and two Great-horned owl nests) were found and monitored this year. Selected wetlands and man-made water sources were monitored for physical parameters and wildlife use. No dead animals were observed this year in any plastic-lined sump. The chemical release test plan for one experiment at the HAZMAT Spill Center on Frenchman Lake playa was reviewed. Seasonal sampling of downwind and upwind transects near the spill center was conducted to document baseline conditions of biota.« less

  16. Ecological Monitoring and Compliance Program Fiscal Year 2002 Report (Part Two of Two)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. A. Wills

    2002-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada (BN) during fiscal year 2002. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species andmore » important biological resources were conducted for 26 NTS projects. These projects have the potential to disturb a total of 374 acres. Thirteen of the projects were in desert tortoise habitat, and 13.38 acres of desert tortoise habitat were disturbed. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed at project areas or along paved roads. Compilation of historical wildlife data continued this year in efforts to develop faunal distribution maps for the NTS. Photographs associated with the NTS ecological landform units sampled to create the NTS vegetation maps were cataloged for future retrieval and analysis. The list of sensitive plant species for which long-term population monitoring is scheduled was revised. Six vascular plants and five mosses were added to the list. Plant density estimates from ten populations of Astragalus beatleyae were collected, and eight known populations of Eriogonum concinnum were visited to assess plant and habitat status. Minimal field monitoring of western burrowing owl burrows occurred. A report relating to the ecology of the western burrowing owl on the Nevada Test Site was prepared which summarizes four years of data collected on this species' distribution, burrow use, reproduction, activity patterns, and food habits. Bat roost sites within seven buildings slated for demolition were identified, and a BN biologist was a contributing author of the Nevada Bat Conservation Plan published by the Nevada Bat Working Group. Thirty-three adult horses and five foals were counted this year. Six active raptor nests (two American kestrel, two Red-tailed hawk, and two Great-horned owl nests) were found and monitored this year. Selected wetlands and man-made water sources were monitored for physical parameters and wildlife use. No dead animals were observed this year in any plastic-lined sump. The chemical release test plan for one experiment at the HAZMAT Spill Center on Frenchman Lake playa was reviewed. Seasonal sampling of downwind and upwind transects near the spill center was conducted to document baseline conditions of biota.« less

  17. More than just consumers: Integrating local observations into drought monitoring to better support decision making

    NASA Astrophysics Data System (ADS)

    Ferguson, D. B.; Masayesva, A.; Meadow, A. M.; Crimmins, M.

    2016-12-01

    Drought monitoring and drought planning are complex endeavors. Measures of precipitation or streamflow provide little context for understanding how social and environmental systems impacted by drought are responding. In arid and semi-arid regions of the world, this challenge is particularly acute since social-ecological systems are already well-adapted to dry conditions. Understanding what drought means in these regions is an important first step in developing a decision-relevant monitoring system. Traditional drought indices may be of some use, but local observations may ultimately be more relevant for informing difficult decisions in response to unusually dry conditions. This presentation will focus on insights gained from a collaborative project between the University of Arizona and the Hopi Tribe-a Native American community in the U.S. Southwest-to develop a drought information system that is responsive to local needs. The primary goal of the project was to develop a system that: is based on how drought is experienced by Hopi citizens and resource managers, can incorporate local observations of drought impacts as well as conventional indicators, and brings together local expertise with conventional science-based observations. This kind of drought monitoring system can harnesses as much available information as possible to inform resource managers, political leaders, and citizens about drought conditions, but such a system can also engage these local drought stakeholders in observing, thinking about, and helping guide planning for drought.

  18. Mapping tobacco industry strategies in South East Asia for action planning and surveillance

    PubMed Central

    Stillman, F; Hoang, M; Linton, R; Ritthiphakdee, B; Trochim, W

    2008-01-01

    Objective: To develop a comprehensive conceptual framework of tobacco industry tactics in four countries in South East Asia for the purpose of: (1) generating consensus on key areas of importance and feasibility for regional and cross country tobacco industry monitoring and surveillance; (2) developing measures to track and monitor the effects of the tobacco industry and to design counterstrategies; and (3) building capacity to improve tobacco control planning in the participating countries. Design: A structured conceptualisation methodology known as concept mapping was used. The process included brainstorming, sorting and rating of statements describing industry activities. Statistical analyses used multidimensional scaling and cluster analysis. Interpretation of the maps was participatory, using regional tobacco control researchers, practitioners, and policy makers during a face to face meeting. Participants: 31 participants in this study come from the four countries represented in the project along with six people from the Johns Hopkins Blomberg School of Public Health. Conclusions: The map shows eight clusters of industry activities within the four countries. These were arranged into four general sectors: economics, politics, public relations and deception. For project design purposes, the map indicates areas of importance and feasibility for monitoring tobacco industry activities and serves as a basis for an initial discussion about action planning. Furthermore, the development of the map used a consensus building process across different stakeholders or stakeholder agencies and is critical when developing regional, cross border strategies for tracking and surveillance. PMID:18218787

  19. The Fermilab ISDN Pilot Project: Experiences and future plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1995-12-31

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen users were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. Each home was equipped with a basic rate ISDN (BRI) line, a BRI Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; andmore » configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking.« less

  20. Monitoring in the nearshore: A process for making reasoned decisions

    USGS Publications Warehouse

    Bodkin, James L.; Dean, T.A.

    2003-01-01

    Over the past several years, a conceptual framework for the GEM nearshore monitoring program has been developed through a series of workshops. However, details of the proposed monitoring program, e.g. what to sample, where to sample, when to sample and at how many sites, have yet to be determined. In FY 03 we were funded under Project 03687 to outline a process whereby specific alternatives to monitoring are developed and presented to the EVOS Trustee Council for consideration. As part of this process, two key elements are required before reasoned decisions can be made. These are: 1) a comprehensive historical perspective of locations and types of past studies conducted in the nearshore marine communities within Gulf of Alaska, and 2) estimates of costs for each element of a proposed monitoring program. We have developed a GIS database that details available information from past studies of selected nearshore habitats and species in the Gulf of Alaska and provide a visual means of selecting sites based (in part) on the locations for which historical data of interest are available. We also provide cost estimates for specific monitoring plan alternatives and outline several alternative plans that can be accomplished within reasonable budgetary constraints. The products that we will provide are: 1) A GIS database and maps showing the location and types of information available from the nearshore in the Gulf of Alaska; 2) A list of several specific monitoring alternatives that can be conducted within reasonable budgetary constraints; and 3) Cost estimates for proposed tasks to be conducted as part of the nearshore program. Because data compilation and management will not be completed until late in FY03 we are requesting support for close-out of this project in FY 04.

  1. Coastal Marsh Monitoring for Persistent Saltwater Intrusion

    NASA Technical Reports Server (NTRS)

    Hall, Callie M.

    2008-01-01

    This viewgraph presentation reviews NASA's work on the project that supports the Gulf of Mexico Alliance (GOMA) Governors Action Plan to monitor the coastal wetlands for saltwater intrusion. The action items that relate to the task are: (1) Obtain information on projected relative sea level rise, subsidence, and storm vulnerability to help prioritize conservation projects, including restoration, enhancement, and acquisition, and (2) Develop and apply ecosystem models to forecast the habitat structure and succession following hurricane disturbance and changes in ecological functions and services that impact vital socio-economic aspects of coastal systems. The objectives of the program are to provide resource managers with remote sensing products that support ecosystem forecasting models requiring salinity and inundation data. Specifically, the proposed work supports the habitat-switching modules in the Coastal Louisiana Ecosystem Assessment and Restoration (CLEAR) model, which provides scientific evaluation for restoration management.

  2. E-SMART system for in-situ detection of environmental contaminants. Quarterly technical progress report, July--September 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-10-01

    General Atomics (GA) leads a team of industrial, academic, and government organizations to develop the Environmental Systems Management, Analysis and Reporting neTwork (E-SMART) for the Defense Advanced Research Project Agency (DARPA), by way of this Technology Reinvestment Project (TRP). E-SMART defines a standard by which networks of smart sensing, sampling, and control devices can interoperate. E-SMART is intended to be an open standard, available to any equipment manufacturer. The user will be provided a standard platform on which a site-specific monitoring plan can be implemented using sensors and actuators from various manufacturers and upgraded as new monitoring devices become commerciallymore » available. This project will further develop and advance the E-SMART standardized network protocol to include new sensors, sampling systems, and graphical user interfaces.« less

  3. NE Ohio Urban Growth Monitoring and Modeling Prototype. Revised

    NASA Technical Reports Server (NTRS)

    Siebert, Loren; Klosterman, Richard E.

    2001-01-01

    At the University of Akron, Dr. Loren Siebert, Dr. Richard Klosterman, and their graduate research assistants (Jung-Wook Kim, Mohammed Hoque, Aziza Parveen, and Ben Stabler) worked on the integration of remote sensing and GIs-based planning support systems. The primary goal of the project was to develop methods that use remote sensing land cover mapping and GIs-based modeling to monitor and project urban growth and farmland loss in northeast Ohio. Another research goal has been to use only GIS data that are accessible via the World Wide Web, to determine whether Ohio's small counties and townships that do not currently have parcel-level GIS systems can apply these techniques. The project was jointly funded by NASA and USGS OhioView grants during the 2000-2001 academic year; the work is now being continued under a USGS grant.

  4. A Profile of TAFE Institutes

    ERIC Educational Resources Information Center

    National Centre for Vocational Education Research (NCVER), 2006

    2006-01-01

    This report presents a profile of Australian technical and further education (TAFE) institutes for the 2003 calendar year. The project was undertaken to illustrate the extent of variation in the sector. The report also provides data on TAFE institutes that can be used by the institutes for planning, performance monitoring and marketing purposes.…

  5. Louisiana Deepwater Horizon Natural Resource Damage Assessment (NRDA)

    Science.gov Websites

    Contact Us How We Restore Planning Damage Assessment Projects Near You Strategic Frameworks Monitoring and Natural Resource Damage Assessment (NRDA) Public Meeting Louisiana Deepwater Horizon Natural Resource Damage Assessment (NRDA) Public Meeting share Posted on November 15, 2010 | Assessment and Early

  6. Link Climate Effects to Surface Water Quality and Drinking Water Plant Adaptation - A Update on Hydroclimatic Province and WTP-ccam Model

    EPA Science Inventory

    Key points in this presentation are: (1) How and why hydroclimatic province can help precipitation projection for water program engineering and management, (2) Implications of initial research results and planned further monitoring / research activities, (3) Five adaptation t...

  7. Designing a global monitoring system for pilot introduction of a new contraceptive technology, subcutaneous DMPA (DMPA-SC).

    PubMed

    Stout, Anna; Wood, Siri; Namagembe, Allen; Kaboré, Alain; Siddo, Daouda; Ndione, Ida

    2018-06-01

    In collaboration with ministries of health, PATH and key partners launched the first pilot introductions of subcutaneous depot medroxyprogesterone acetate (DMPA-SC, brand name Sayana ® Press) in Burkina Faso, Niger, Senegal, and Uganda from July 2014 through June 2016. While each country implemented a unique introduction strategy, all agreed to track a set of uniform indicators to chart the effect of introducing this new method across settings. Existing national health information systems (HIS) were unable to track new methods or delivery channels introduced for a pilot, thus were not a feasible source for project data. We successfully monitored the four-country pilot introductions by implementing a four-phase approach: 1) developing and defining global indicators, 2) integrating indicators into existing country data collection tools, 3) facilitating consistent reporting and data management, and 4) analyzing and interpreting data and sharing results. Project partners leveraged existing family planning registers to the extent possible, and introduced new or modified data collection and reporting tools to generate project-specific data where necessary. We routinely shared monitoring results with global and national stakeholders, informing decisions about future investments in the product and scale up of DMPA-SC nationwide. Our process and lessons learned may provide insights for countries planning to introduce DMPA-SC or other new contraceptive methods in settings where stakeholder expectations for measureable results for decision-making are high. Copyright © 2018 The Authors. Published by Elsevier Ltd.. All rights reserved.

  8. Idaho Habitat and Natural Production Monitoring Part I, 1993 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rich, Bruce A.; Petrosky, Charles E.

    The Idaho Department of Fish and Game (IDFG) has been monitoring and evaluating proposed and existing habitat improvement projects for rainbow-steelhead trout Oncorhynchus mykiss and chinook salmon O. tshawytscha in the Clearwater River and Salmon River drainages on a large scale for the past 8 years. Projects included in the evaluation are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia rivers. A mitigation record is being developed using increased carrying capacity and/or survival as the best measures ofmore » benefit from a habitat enhancement project. Determination of full benefit from a project depends on completion or maturation of the project and presence of adequate numbers of fish to document actual increases in fish production. The depressed status of upriver anadromous stocks has precluded measuring full benefits of any habitat project in Idaho. Partial benefit is credited to the mitigation record in the interim period of run restoration.« less

  9. Linking physical monitoring to coho and Chinook salmon populations in the Redwood Creek Watershed, California—Summary of May 3–4, 2012 Workshop

    USGS Publications Warehouse

    Madej, Mary Ann; Torregrosa, Alicia; Woodward, Andrea

    2012-01-01

    On Thursday, May 3, 2012, a science workshop was held at the Redwood National and State Parks (RNSP) office in Arcata, California, with researchers and resource managers working in RNSP to share data and expert opinions concerning salmon populations and habitat in the Redwood Creek watershed. The focus of the workshop was to discuss how best to synthesize physical and biological data related to the freshwater and estuarine phases of salmon life cycles in order to increase the understanding of constraints on salmon populations. The workshop was hosted by the U.S. Geological Survey (USGS) Status and Trends (S&T) Program National Park Monitoring Project (http://www.fort.usgs.gov/brdscience/ParkMonitoring.htm), which supports USGS research on priority topics (themes) identified by the National Park Service (NPS) Inventory and Monitoring Program (I&M) and S&T. The NPS has organized more than 270 parks with significant natural resources into 32 Inventory and Monitoring (I&M) Networks (http://science.nature.nps.gov/im/networks.cfm) that share funding and core professional staff to monitor the status and long-term trends of selected natural resources (http://science.nature.nps.gov/im/monitor). All 32 networks have completed vital signs monitoring plans (available at http://science.nature.nps.gov/im/monitor/MonitoringPlans.cfm), containing background information on the important resources of each park, conceptual models behind the selection of vital signs for monitoring the condition of natural resources, and the selection of high priority vital signs for monitoring. Vital signs are particular physical, chemical, and biological elements and processes of park ecosystems that represent the overall health or condition of the park, known or hypothesized effects of stressors, or elements that have important human values (Fancy and others, 2009). Beginning in 2009, the I&M program funded projects to analyze and synthesize the biotic and abiotic data generated by vital signs monitoring and previous in-park natural resource monitoring and inventories to provide useful information, models, and tools to park managers for addressing resource management issues. The workshop described in this report is an element of the project funded by USGS NPS-I&M program to conduct a synthesis of salmon-related datasets in the Klamath (KLMN) and San Francisco Bay Area (SFAN) networks of national parks. The synthesis focused on four park units: Redwood National Park (KLMN), Point Reyes National Seashore, Muir Woods National Monument, and Golden Gate National Recreation Area (SFAN).

  10. [Fishery resource protection by artificial propagation in hydroelectric development: Lixianjiang River drainage in Yunnan as an example].

    PubMed

    Yang, Yong-Hong; Yang, Jun-Xing; Pan, Xiao-Fu; Zhou, Wei; Yang, Mei-Lin

    2011-04-01

    Hydroelectric developments can result in a number of negative environmental consequences. Conservation aquaculture is a branch of science derived from conservation and population recovery studies on endangered fishes. Here we discuss the impacts on fishes caused by hydropower projects in Lixianjiang, and evaluate effects and problems on the propagation of Parazacco spilurus, Hemibagrus pluriradiatus, Neolissochilus benasi and Semilabeo obscurus. A successful propagation project includes foraging ecology in fields, pond cultivation, juvenile fish raising, prevention and curing on fish disease, genetic management, artificial releasing and population monitoring. Artificial propagation is the practicable act on genetic intercommunication, preventing population deterioration for fishes in upper and lower reaches of the dam. For long-term planning, fish stocks are not suitable for many kind of fishes, but can prevent fishes from going extinct in the wild. Basic data collection on fish ecology, parent fish hunting, prevention on fish disease are the most important factors on artificial propagation. Strengthening the genetic management of stock population for keeping a higher genetic diversity can increase the success of stock enhancement. The works on Lixianjiang provide a new model for river fish protection. To make sure the complicated project works well, project plans, commission contracts, base line monitoring and techniques on artificial reproduction must be considered early. Last, fishery conservation should be considered alongside location development.

  11. Cooperative Monitoring Center Occasional Paper/11: Cooperative Environmental Monitoring in the Coastal Regions of India and Pakistan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rajen, Gauray

    1999-06-01

    The cessation of hostilities between India and Pakistan is an immediate need and of global concern, as these countries have tested nuclear devices, and have the capability to deploy nuclear weapons and long-range ballistic missiles. Cooperative monitoring projects among neighboring countries in South Asia could build regional confidence, and, through gradual improvements in relations, reduce the threat of war and the proliferation of weapons of mass destruction. This paper discusses monitoring the trans-border movement of flow and sediment in the Indian and Pakistani coastal areas. Through such a project, India and Pakistan could initiate greater cooperation, and engender movement towardsmore » the resolution of the Sir Creek territorial dispute in their coastal region. The Joint Working Groups dialogue being conducted by India and Pakistan provides a mechanism for promoting such a project. The proposed project also falls within a regional framework of cooperation agreed to by several South Asian countries. This framework has been codified in the South Asian Seas Action Plan, developed by Bangladesh, India, Maldives, Pakistan and Sri Lanka. This framework provides a useful starting point for Indian and Pakistani cooperative monitoring in their trans-border coastal area. The project discussed in this paper involves computer modeling, the placement of in situ sensors for remote data acquisition, and the development of joint reports. Preliminary computer modeling studies are presented in the paper. These results illustrate the cross-flow connections between Indian and Pakistani coastal regions and strengthen the argument for cooperation. Technologies and actions similar to those suggested for the coastal project are likely to be applied in future arms control and treaty verification agreements. The project, therefore, serves as a demonstration of cooperative monitoring technologies. The project will also increase people-to-people contacts among Indian and Pakistani policy makers and scientists. In the perceptions of the general public, the project will crystallize the idea that the two countries share ecosystems and natural resources, and have a vested interest in increased collaboration.« less

  12. Concurrent planning and execution for a walking robot

    NASA Astrophysics Data System (ADS)

    Simmons, Reid

    1990-07-01

    The Planetary Rover project is developing the Ambler, a novel legged robot, and an autonomous software system for walking the Ambler over rough terrain. As part of the project, we have developed a system that integrates perception, planning, and real-time control to navigate a single leg of the robot through complex obstacle courses. The system is integrated using the Task Control Architecture (TCA), a general-purpose set of utilities for building and controlling distributed mobile robot systems. The walking system, as originally implemented, utilized a sequential sense-plan-act control cycle. This report describes efforts to improve the performance of the system by concurrently planning and executing steps. Concurrency was achieved by modifying the existing sequential system to utilize TCA features such as resource management, monitors, temporal constraints, and hierarchical task trees. Performance was increased in excess of 30 percent with only a relatively modest effort to convert and test the system. The results lend support to the utility of using TCA to develop complex mobile robot systems.

  13. Sustainability of partnership projects: a conceptual framework and checklist.

    PubMed

    Edwards, Janine C; Feldman, Penny Hollander; Sangl, Judy; Polakoff, David; Stern, Glen; Casey, Don

    2007-12-01

    There is growing recognition that the health care delivery system in the United States must make major changes. Intervention projects focusing on quality and patient safety offer the potential for reshaping the future of medicine. Sustainability of the Partnerships for Quality (PFQ) projects and other patient safety and quality improvement projects that provide evidence of effectiveness is essential if progress is to be made. For the purposes of these projects, a conceptual framework and a checklist for sustainability were developed. The framework consists of two dimensions: (1) the goals--what is to be sustained--and (2) elements for sustainability--infrastructure, incentives, incremental opportunities for involvement, and integration. The checklist is designed to trigger planning for sustainability early in a project's design. Specific questions about each of the elements can cue planners and project leaders to build in the goals for sustainability and change processes. A pilot test showed that the framework and checklist are relevant and helpful across a variety of projects. Two extended examples of planning and action for sustainability from the PFQ projects are described. It is too early to claim sustainability for these project. However, continued monitoring for at least three years with the checklist could result in valuable national data with which to design and implement future projects.

  14. Data Validation Package June 2016 Groundwater and Surface Water Sampling at the Old and New Rifle, Colorado, Processing Sites September 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Richard; Lemke, Peter

    Sampling Period: June 14–17 and July 7, 2016. Water samples were collected from 36 locations at New Rifle and Old Rifle, Colorado, Disposal/Processing Sites. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. Duplicate samples were collected from New Rifle locations 0216 and 0855, and Old Rifle location 0655. One equipment blank was collected after decontamination of non-dedicated equipment used to collect one surface water sample. See Attachment 2, Trip Report for additional details. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Managementmore » Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and- analysis-plan-us-department-energy-office-legacy-management-sites). New Rifle Site Samples were collected at the New Rifle site from 16 monitoring wells and 7 surface locations in compliance with the December 2008 Groundwater Compliance Action Plan [GCAP] for the New Rifle, Colorado, Processing Site (LMS/RFN/S01920). Monitoring well 0216 could not be sampled in June because it was surrounded by standing water due to the high river stage from spring runoff, it was later sampled in July. Monitoring well 0635 and surface location 0322 could not be sampled because access through the elk fence along Interstate 70 has not been completed at this time. Old Rifle Site Samples were collected at the Old Rifle site from eight monitoring wells and five surface locations in compliance with the December 2001 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site (GJ0-2000-177-TAR).« less

  15. Developing a monitoring and evaluation framework to integrate and formalize the informal waste and recycling sector: the case of the Philippine National Framework Plan.

    PubMed

    Serrona, Kevin Roy B; Yu, Jeongsoo; Aguinaldo, Emelita; Florece, Leonardo M

    2014-09-01

    The Philippines has been making inroads in solid waste management with the enactment and implementation of the Republic Act 9003 or the Ecological Waste Management Act of 2000. Said legislation has had tremendous influence in terms of how the national and local government units confront the challenges of waste management in urban and rural areas using the reduce, reuse, recycle and recovery framework or 4Rs. One of the sectors needing assistance is the informal waste sector whose aspiration is legal recognition of their rank and integration of their waste recovery activities in mainstream waste management. To realize this, the Philippine National Solid Waste Management Commission initiated the formulation of the National Framework Plan for the Informal Waste Sector, which stipulates approaches, strategies and methodologies to concretely involve the said sector in different spheres of local waste management, such as collection, recycling and disposal. What needs to be fleshed out is the monitoring and evaluation component in order to gauge qualitative and quantitative achievements vis-a-vis the Framework Plan. In the process of providing an enabling environment for the informal waste sector, progress has to be monitored and verified qualitatively and quantitatively and measured against activities, outputs, objectives and goals. Using the Framework Plan as the reference, this article developed monitoring and evaluation indicators using the logical framework approach in project management. The primary objective is to institutionalize monitoring and evaluation, not just in informal waste sector plans, but in any waste management initiatives to ensure that envisaged goals are achieved. © The Author(s) 2014.

  16. Standards for documenting and monitoring bird reintroduction projects

    USGS Publications Warehouse

    Sutherland, W.J.; Armstrong, D.; Butchart, S.H.M.; Earnhardt, J.M.; Ewen, J.; Jamieson, I.; Jones, C.G.; Lee, R.; Newbery, P.; Nichols, J.D.; Parker, K.A.; Sarrazin, F.; Seddon, P.J.; Shah, N.; Tatayah, V.

    2010-01-01

    It would be much easier to assess the effectiveness of different reintroduction methods, and so improve the success of reintroductions, if there was greater standardization in documentation of the methods and outcomes. We suggest a series of standards for documenting and monitoring the methods and outcomes associated with reintroduction projects for birds. Key suggestions are: documenting the planned release before it occurs, specifying the information required on each release, postrelease monitoring occurring at standard intervals of 1 and 5 years (and 10 for long-lived species), carrying out a population estimate unless impractical, distinguishing restocked and existing individuals when supplementing populations, and documenting the results. We suggest these principles would apply, largely unchanged, to other vertebrate classes. Similar methods could be adopted for invertebrates and plants with appropriate modification. We suggest that organizations publically state whether they will adopt these approaches when undertaking reintroductions. Similar standardization would be beneficial for a wide range of topics in environmental monitoring, ecological studies, and practical conservation. ??2010 Wiley Periodicals, Inc.

  17. Fluid Management Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Findlay, Rick

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, southmore » of Highway 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.« less

  18. Fluid Management Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 1 with ROTC 1 and Errata Sheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tim Echelard

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, south of Highwaymore » 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.« less

  19. Building for the Future: China’s Progress in Space Technology During the Tenth 5-Year Plan and the U.S. Response

    DTIC Science & Technology

    2008-03-01

    solar telescope to study solar physics. — Develop technologies for a three-satellite constellation called Kua Fu to study solar activity that will...consist of one satellite to monitor solar activity and two others to study the aurora. • International cooperation. Participate in the Sino...Russian Mars environment exploration plan, the World Space Observatory Ultraviolet Project,50 and the Sino-French Small Satellite Solar Flare Exploration

  20. PLUS: 'Planning Land Use with Students' is a Local Land Use Policy That Showcase the Geosciences

    NASA Astrophysics Data System (ADS)

    Turrin, M.

    2014-12-01

    Land Use decisions in the local community are well represented in geoscience topics and issues, and provide an excellent opportunity to showcase a wide range of geoscience careers to high school students. In PLUS (Planning Land Use with Students) we work with youth corps, volunteer agencies and the County Departments of Planning, Transportation, Public Health, Water Resources to run a program for high school seniors to engage the students in the complex layers of decision making connected with land use as we showcase geoscience careers (http://www.ldeo.columbia.edu/edu/plus/index.html). How development occurs, what resources are in use and who makes these decisions is both interesting and relevant for students. We develop case studies around current, active, local land use issues large enough in scale to have a formal environmental review at the County and/or the State level. Sections of each case study are dedicated to addressing the range of environmental issues that are central to each land use decision. Water, its availability, planned use and treatment on the site, brings in both a review of local hydrology and a discussion of storm water management. Air quality and the impact of the proposed project's density, transportation plans, and commercial and industrial uses brings in air quality issues like air quality ratings, existing pollution, and local air monitoring. A review of the site plans brings in grading plans for the project area, which highlights issues of drainage, soil stability, and exposure to toxins or pollutants depending on the historic use of the site. Brownfield redevelopments are especially challenging with various monitoring, clean up and usage restrictions that are extremely interesting to the students. Students' work with mentors from the community who represent various roles in the planning process including a range of geosciences, community business members and other players in the planning process. This interplay of individuals provides a realistic look at the forces that move land use decision-making in a community. Discussion of impacts and mitigations highlight the intersection of policy and science. Debate arises on how much science should guide policy and how much land use policy decisions require science monitoring, pushing new scientific developments.

  1. Classifications for Coastal Wetlands Planning, Protection and Restoration Act site-specific projects: 2008 and 2009

    USGS Publications Warehouse

    Jones, William R.; Garber, Adrienne

    2012-01-01

    The Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) funds over 100 wetland restoration projects across Louisiana. Integral to the success of CWPPRA is its long-term monitoring program, which enables State and Federal agencies to determine the effectiveness of each restoration effort. One component of this monitoring program is the analysis of high-resolution, color-infrared aerial photography at the U.S. Geological Survey's National Wetlands Research Center in Lafayette, Louisiana. Color-infrared aerial photography (9- by 9-inch) is obtained before project construction and several times after construction. Each frame is scanned on a photogrametric scanner that produces a high-resolution image in Tagged Image File Format (TIFF). By using image-processing software, these TIFF files are then orthorectified and mosaicked to produce a seamless image of a project area and its associated reference area (a control site near the project that has common environmental features, such as marsh type, soil types, and water salinities.) The project and reference areas are then classified according to pixel value into two distinct classes, land and water. After initial land and water ratios have been established by using photography obtained before and after project construction, subsequent comparisons can be made over time to determine land-water change. Several challenges are associated with the land-water interpretation process. Primarily, land-water classifications are often complicated by the presence of floating aquatic vegetation that occurs throughout the freshwater systems of coastal Louisiana and that is sometimes difficult to differentiate from emergent marsh. Other challenges include tidal fluctuations and water movement from strong winds, which may result in flooding and inundation of emergent marsh during certain conditions. Compensating for these events is difficult but possible by using other sources of imagery to verify marsh conditions for other dates in time.

  2. Final report : groundwater monitoring at Centralia, Kansas, inSeptember-October 2005 and March 2006, with expansion of the monitoringnetwork in January 2006.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.

    2006-12-07

    This document reports the results of groundwater sampling in September-October 2005 and March 2006 at the grain storage facility formerly operated at Centralia, Kansas, by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). These activities were the first and second twice yearly sampling events of the two-year monitoring program approved by the CCC/USDA and Kansas Department of Health and Environment (KDHE) project managers. The initial monitoring network sampled in September and October 2005 consisted of six monitoring wells (MW1-MW6) installed in 2004, plus five groundwater piezometers (SB01, SB04, SB05, SB08, SB09) installed in 2002. The combined September-Octobermore » 2005 sampling was the first monitoring event in the planned two-year program for Centralia. The groundwater samples collected in both September and October were analyzed for volatile organic compounds (VOCs), and samples collected in September were analyzed for dissolved hydrogen and additional groundwater parameters to aid in evaluating the potential for reductive dechlorination processes. After the monitoring in September-October 2005, Argonne recommended expansion of the initial monitoring network. Previous sampling (August 2004) had already suggested that this network of six monitoring wells and five piezometers was inadequate to delineate the extent of the carbon tetrachloride plume. With the approval of the CCC/USDA and KDHE project managers, the monitoring network was expanded in January 2006 through the installation of four additional monitoring wells (MW7-MW10) and one new piezometer (SB07R) to replace a damaged piezometer (the former SB07). Details of the monitoring well and piezometer installations are reported in this document. The expanded monitoring network of ten monitoring wells (MW01-MW10) and six piezometers (SB01, SB04, SB05, SB07R, SB08, and SB09) was sampled in March 2006. This March 2006 sampling was the second monitoring event in the planned two-year program. Results of analyses for VOCs showed further increases in contaminant levels and expansion of the carbon tetrachloride plume toward the south and west from the former CCC/USDA facility. The groundwater samples collected in March 2006 were also analyzed for additional groundwater parameters to aid in the evaluation of the potential for reductive dechlorination processes. Preliminary screening of groundwater parameters provided limited evidence that reductive dechlorination of carbon tetrachloride is taking place at some locations on the former CCC/USDA facility. Groundwater levels measured manually in September 2005, March 2006, and June 2006 were used to map the potentiometric surface at Centralia. Overall, these results were consistent with each other and with previous measurements, generally indicating a groundwater flow direction toward the south-southwest from the former CCC/USDA facility. Data recorders installed in wells MW01-MW06 in August 2004 are gathering long-term data on the groundwater elevation and gradient. Data downloaded in March 2005, September 2005, and June 2006 indicate that two wells north and west of the former CCC/USDA facility boundary show distinct, transient and seasonal water level variations. In contrast, two different wells southwest and south of the former facility boundary show virtually no response to the same events. The first two monitoring events of the planned two-year monitoring program for Centralia have demonstrated increased carbon tetrachloride concentrations and lateral expansion of the contaminated zone. Argonne recommends that the CCC/USDA and KDHE project managers consider development and approval of a work plan to expedite the selection and implementation of an active remedial alternative addressing the concentrated areas of groundwater contamination before the end of the two-year monitoring program in 2007.« less

  3. Russian-Cuban Colocation Station for Radio Astronomical Observation and Monitoring of Near-Earth Space

    NASA Astrophysics Data System (ADS)

    Ivanov, D. V.; Uratsuka, M.-R.; Ipatov, A. V.; Marshalov, D. A.; Shuygina, N. V.; Vasilyev, M. V.; Gayazov, I. S.; Ilyin, G. N.; Bondarenko, Yu. S.; Melnikov, A. E.; Suvorkin, V. V.

    2018-04-01

    The article presents the main possibilities of using the projected Russian-Cuban geodynamic colocation station on the basis of the Institute of Geophysics and Astronomy of the Ministry of Science, Technology and the Environment of the Republic of Cuba to carry out radio observations and monitoring the near-Earth space. Potential capabilities of the station are considered for providing various observational programs: astrophysical observations; observations by space geodesy methods using radio very long baselines interferometers, global navigation satellite systems, laser rangers, and various Doppler systems, as well as monitoring of artificial and natural bodies in the near-Earth and deep space, including the ranging of asteroids approaching the Earth. The results of modeling the observations on the planned station are compared with that obtained on the existing geodynamic stations. The efficiency of the projected Russian-Cuban station for solving astronomical tasks is considered.

  4. A study of mass data storage technology for rocket engine data

    NASA Technical Reports Server (NTRS)

    Ready, John F.; Benser, Earl T.; Fritz, Bernard S.; Nelson, Scott A.; Stauffer, Donald R.; Volna, William M.

    1990-01-01

    The results of a nine month study program on mass data storage technology for rocket engine (especially the Space Shuttle Main Engine) health monitoring and control are summarized. The program had the objective of recommending a candidate mass data storage technology development for rocket engine health monitoring and control and of formulating a project plan and specification for that technology development. The work was divided into three major technical tasks: (1) development of requirements; (2) survey of mass data storage technologies; and (3) definition of a project plan and specification for technology development. The first of these tasks reviewed current data storage technology and developed a prioritized set of requirements for the health monitoring and control applications. The second task included a survey of state-of-the-art and newly developing technologies and a matrix-based ranking of the technologies. It culminated in a recommendation of optical disk technology as the best candidate for technology development. The final task defined a proof-of-concept demonstration, including tasks required to develop, test, analyze, and demonstrate the technology advancement, plus an estimate of the level of effort required. The recommended demonstration emphasizes development of an optical disk system which incorporates an order-of-magnitude increase in writing speed above the current state of the art.

  5. Incorporating climate change projections into riparian restoration planning and design

    USGS Publications Warehouse

    Perry, Laura G.; Reynolds, Lindsay V.; Beechie, Timothy J.; Collins, Mathias J.; Shafroth, Patrick B.

    2015-01-01

    Climate change and associated changes in streamflow may alter riparian habitats substantially in coming decades. Riparian restoration provides opportunities to respond proactively to projected climate change effects, increase riparian ecosystem resilience to climate change, and simultaneously address effects of both climate change and other human disturbances. However, climate change may alter which restoration methods are most effective and which restoration goals can be achieved. Incorporating climate change into riparian restoration planning and design is critical to long-term restoration of desired community composition and ecosystem services. In this review, we discuss and provide examples of how climate change might be incorporated into restoration planning at the key stages of assessing the project context, establishing restoration goals and design criteria, evaluating design alternatives, and monitoring restoration outcomes. Restoration planners have access to numerous tools to predict future climate, streamflow, and riparian ecology at restoration sites. Planners can use those predictions to assess which species or ecosystem services will be most vulnerable under future conditions, and which sites will be most suitable for restoration. To accommodate future climate and streamflow change, planners may need to adjust methods for planting, invasive species control, channel and floodplain reconstruction, and water management. Given the considerable uncertainty in future climate and streamflow projections, riparian ecological responses, and effects on restoration outcomes, planners will need to consider multiple potential future scenarios, implement a variety of restoration methods, design projects with flexibility to adjust to future conditions, and plan to respond adaptively to unexpected change.

  6. ISIS and META projects

    NASA Technical Reports Server (NTRS)

    Birman, Kenneth; Cooper, Robert; Marzullo, Keith

    1990-01-01

    ISIS and META are two distributed systems projects at Cornell University. The ISIS project, has developed a new methodology, virtual synchrony, for writing robust distributed software. This approach is directly supported by the ISIS Toolkit, a programming system that is distributed to over 300 academic and industrial sites. Several interesting applications that exploit the strengths of ISIS, including an NFS-compatible replicated file system, are being developed. The META project, is about distributed control in a soft real time environment incorporating feedback. This domain encompasses examples as diverse as monitoring inventory and consumption on a factory floor and performing load-balancing on a distributed computing system. One of the first uses of META is for distributed application management: the tasks of configuring a distributed program, dynamically adapting to failures, and monitoring its performance. Recent progress and current plans are presented. This approach to distributed computing, a philosophy that is believed to significantly distinguish the work from that of others in the field, is explained.

  7. E-SMART system for in-situ detection of environmental contaminants. Quarterly technical progress report, April--June 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-08-01

    General Atomics (GA) leads a team of industrial, academic, and government organizations in the development of the Environmental Systems Management, Analysis and Reporting neTwork (E-SMART) for the Defense Advanced Research Project Agency (DARPA), by way of this Technology Reinvestment Project (TRP). E-SMART defines a standard by which networks of smart sensing, sampling, and control devices can interoperate. E-SMART is intended to be an open standard, available to any equipment manufacturer. The user will be provided a standard platform on which a site-specific monitoring plan can be implemented using sensors and actuators from various manufacturers and upgraded as new monitoring devicesmore » become commercially available. This project will further develop and advance the E-SMART standardized network protocol to include new sensors, sampling systems, and graphical user interfaces.« less

  8. On the monitoring and prediction of flash floods in small and medium-sized catchments - the EXTRUSO project

    NASA Astrophysics Data System (ADS)

    Wiemann, Stefan; Eltner, Anette; Sardemann, Hannes; Spieler, Diana; Singer, Thomas; Thanh Luong, Thi; Janabi, Firas Al; Schütze, Niels; Bernard, Lars; Bernhofer, Christian; Maas, Hans-Gerd

    2017-04-01

    Flash floods regularly cause severe socio-economic damage worldwide. In parallel, climate change is very likely to increase the number of such events, due to an increasing frequency of extreme precipitation events (EASAC 2013). Whereas recent work primarily addresses the resilience of large catchment areas, the major impact of hydro-meteorological extremes caused by heavy precipitation is on small areas. Those are very difficult to observe and predict, due to sparse monitoring networks and only few means for hydro-meteorological modelling, especially in small catchment areas. The objective of the EXTRUSO project is to identify and implement appropriate means to close this gap by an interdisciplinary approach, combining comprehensive research expertise from meteorology, hydrology, photogrammetry and geoinformatics. The project targets innovative techniques for achieving spatio-temporal densified monitoring and simulations for the analysis, prediction and warning of local hydro-meteorological extreme events. The following four aspects are of particular interest: 1. The monitoring, analysis and combination of relevant hydro-meteorological parameters from various sources, including existing monitoring networks, ground radar, specific low-cost sensors and crowdsourcing. 2. The determination of relevant hydro-morphological parameters from different photogrammetric sensors (e.g. camera, laser scanner) and sensor platforms (e.g. UAV (unmanned aerial vehicle) and UWV (unmanned water vehicle)). 3. The continuous hydro-meteorological modelling of precipitation, soil moisture and water flows by means of conceptual and data-driven modelling. 4. The development of a collaborative, web-based service infrastructure as an information and communication point, especially in the case of an extreme event. There are three major applications for the planned information system: First, the warning of local extreme events for the population in potentially affected areas, second, the support for decision makers and emergency responders in the case of an event and, third, the development of open, interoperable tools for other researchers to be applied and further developed. The test area of the project is the Free State of Saxony (Germany) with a number of small and medium catchment areas. However, the whole system, comprising models, tools and sensor setups, is planned to be transferred and tested in other areas, within and outside Europe, as well. The team working on the project consists of eight researchers, including five PhD students and three postdocs. The EXTRUSO project is funded by the European Social Fund (ESF grant nr. 100270097) with a project duration of three years until June 2019. EASAC (2013): Trends in extreme weather events in Europe: implications for national and European Union adaption strategies. European Academies Science Advisory Council. Policy report 22, November 2013 The EXTRUSO project is funded by the European Social Fund (ESF), grant nr. 100270097

  9. U.S. Navy Capstone Strategies and Concepts (1991-2000): Strategy, Policy, Concept, and Vision Documents

    DTIC Science & Technology

    2012-03-01

    PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) CNA Corporation,4825 Mark Center Drive... industry & USMC OMFTS experience  Project Team created BPR “activity model” (Oct-Dec 1995) OPNAV N513, N812; HQMC Plans, PP&O; MCCDC; NDC; SRA...Alexandria,VA,22311 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) 11

  10. State of the art evaluation of traffic detection and monitoring systems. Volume 1, Phases A & B : design [Final report

    DOT National Transportation Integrated Search

    2007-10-01

    This report covers the Phase A and B activities of Research Project SPR 627 for the Arizona Department of Transportation (ADOT). Phase C is planned as a separate research activity and is anticipated to begin in the near term, following the completion...

  11. DEMONSTRATION AND QUALITY ASSURANCE PROJECT PLAN TECHNOLOGIES FOR THE MONITORING AND MEASUREMENT OF DIOXIN AND DIOXIN-LIKE COMPOUNDS IN SOIL AND SEDIMENT

    EPA Science Inventory

    The demonstration of technologies for determining the presence of dioxin in soil and sediment is being conducted under the U.S. Environmental Protection Agency Superfund Innovative Technology Evaluation Program in Saginaw, Michigan, at Green Point Environmental Learning Center fr...

  12. Monitoring bird populations in small geographic areas

    USGS Publications Warehouse

    Dunn, Erica H.; Bart, J.; Collins, B.T.; Craig, B.; Dale, B.; Downes, C.M.; Francis, C.M.; Woodley, S.; Zorn, P.

    2006-01-01

    Numerous methods exist for monitoring bird populations, and there is a large literature describing them. There are few resources, however, that provide comprehensive advice on every step of organizing and carrying out a survey, from the early stages of planning to final use of the data. Even fewer resources are designed to meet the needs of a wide variety of potential users, from amateurs interested in change of bird life in a local study preserve to professionals testing hypotheses on the response of birds to habitat management, although much of the advice should be the same for every monitoring program. Whether survey objectives are very modest or rigorously scientific, samples must be sufficiently numerous and well distributed to provide meaningful results, and the survey should be well designed to ensure that the money and effort going into it are not wasted. This document is intended to be a complete resource for anyone planning to organize monitoring of noncolonial landbirds within a relatively small geographic area (e.g., from the size of a woodlot to a large park). The first of its two parts provides background explaining the importance of good study design and gives specific advice on all aspects of project planning and execution of high-quality data collection for the purpose of hypothesis testing. The second part is self-contained and nontechnical and describes complete plans for a site-specific checklist survey, suitable for addressing monitoring questions frequently asked by amateurs and for involvement of volunteers in data collection. Throughout are references to additional resources, from background literature to sources of existing survey protocols, analysis software, and tools for archiving data.

  13. Building Construction Progress Monitoring Using Unmanned Aerial System (uas), Low-Cost Photogrammetry, and Geographic Information System (gis)

    NASA Astrophysics Data System (ADS)

    Bognot, J. R.; Candido, C. G.; Blanco, A. C.; Montelibano, J. R. Y.

    2018-05-01

    Monitoring the progress of building's construction is critical in construction management. However, measuring the building construction's progress are still manual, time consuming, error prone, and impose tedious process of analysis leading to delays, additional costings and effort. The main goal of this research is to develop a methodology for building construction progress monitoring based on 3D as-built model of the building from unmanned aerial system (UAS) images, 4D as-planned model (with construction schedule integrated) and, GIS analysis. Monitoring was done by capturing videos of the building with a camera-equipped UAS. Still images were extracted, filtered, bundle-adjusted, and 3D as-built model was generated using open source photogrammetric software. The as-planned model was generated from digitized CAD drawings using GIS. The 3D as-built model was aligned with the 4D as-planned model of building formed from extrusion of building elements, and integration of the construction's planned schedule. The construction progress is visualized via color-coding the building elements in the 3D model. The developed methodology was conducted and applied from the data obtained from an actual construction site. Accuracy in detecting `built' or `not built' building elements ranges from 82-84 % and precision of 50-72 %. Quantified progress in terms of the number of building elements are 21.31% (November 2016), 26.84 % (January 2017) and 44.19 % (March 2017). The results can be used as an input for progress monitoring performance of construction projects and improving related decision-making process.

  14. The ISIS project: Fault-tolerance in large distributed systems

    NASA Technical Reports Server (NTRS)

    Birman, Kenneth P.; Marzullo, Keith

    1990-01-01

    The semi-annual status report covers activities of the ISIS project during the second half of 1989. The project had several independent objectives: (1) At the level of the ISIS Toolkit, ISIS release V2.0 was completed, containing bypass communication protocols. Performance of the system is greatly enhanced by this change, but the initial software release is limited in some respects. (2) The Meta project focused on the definition of the Lomita programming language for specifying rules that monitor sensors for conditions of interest and triggering appropriate reactions. This design was completed, and implementation of Lomita is underway on the Meta 2.0 platform. (3) The Deceit file system effort completed a prototype. It is planned to make Deceit available for use in two hospital information systems. (4) A long-haul communication subsystem project was completed and can be used as part of ISIS. This effort resulted in tools for linking ISIS systems on different LANs together over long-haul communications lines. (5) Magic Lantern, a graphical tool for building application monitoring and control interfaces, is included as part of the general ISIS releases.

  15. SU-E-T-76: A Software System to Monitor VMAT Plan Complexity in a Large Radiotherapy Centre

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arumugam, S; Xing, A; Ingham Institute, Sydney, NSW

    2015-06-15

    Purpose: To develop a system that analyses and reports the complexity of Volumetric Modulated Arc Therapy (VMAT) plans to aid in the decision making for streamlining patient specific dosimetric quality assurance (QA) tests. Methods: A software system, Delcheck, was developed in-house to calculate VMAT plan and delivery complexity using the treatment delivery file. Delcheck has the functionality to calculate multiple plan complexity metrics including the Li-Xing Modulation Index (LI-MI), multiplicative combination of Leaf Travel and Modulation Complexity Score (LTMCSv), Monitor Units per prescribed dose (MU/D) and the delivery complexity index (MIt) that incorporates the modulation of dose rate, leaf speedmore » and gantry speed. Delcheck includes database functionality to store and compare plan metrics for a specified treatment site. The overall plan and delivery complexity is assessed based on the 95% conformance limit of the complexity metrics as Similar, More or Less complex. The functionality of the software was tested using 42 prostate conventional, 10 prostate SBRT and 15 prostate bed VMAT plans generated for an Elekta linear accelerator. Results: The mean(σ) of LI-MI for conventional, SBRT and prostate bed plans were 1690(486), 3215.4(1294) and 3258(982) respectively. The LTMCSv of the studied categories were 0.334(0.05), 0.325(0.07) and 0.3112(0.09). The MU/D of the studied categories were 2.4(0.4), 2.7(0.7) and 2.5(0.5). The MIt of the studied categories were 21.6(3.4), 18.2(3.0) and 35.9(6.6). The values of the complexity metrics show that LI-MI appeared to resolve the plan complexity better than LTMCSv and MU/D. The MIt value increased as the delivery complexity increased. Conclusion: The developed software was shown to be working as expected. In studied treatment categories Prostate bed plans are more complex in both plan and delivery and SBRT is more complex in plan and less complex in delivery as demonstrated by LI-MI and MIt. This project was funded through a Cancer Council NSW Project Grant (RG14-11)« less

  16. An efficient inverse radiotherapy planning method for VMAT using quadratic programming optimization.

    PubMed

    Hoegele, W; Loeschel, R; Merkle, N; Zygmanski, P

    2012-01-01

    The purpose of this study is to investigate the feasibility of an inverse planning optimization approach for the Volumetric Modulated Arc Therapy (VMAT) based on quadratic programming and the projection method. The performance of this method is evaluated against a reference commercial planning system (eclipse(TM) for rapidarc(TM)) for clinically relevant cases. The inverse problem is posed in terms of a linear combination of basis functions representing arclet dose contributions and their respective linear coefficients as degrees of freedom. MLC motion is decomposed into basic motion patterns in an intuitive manner leading to a system of equations with a relatively small number of equations and unknowns. These equations are solved using quadratic programming under certain limiting physical conditions for the solution, such as the avoidance of negative dose during optimization and Monitor Unit reduction. The modeling by the projection method assures a unique treatment plan with beneficial properties, such as the explicit relation between organ weightings and the final dose distribution. Clinical cases studied include prostate and spine treatments. The optimized plans are evaluated by comparing isodose lines, DVH profiles for target and normal organs, and Monitor Units to those obtained by the clinical treatment planning system eclipse(TM). The resulting dose distributions for a prostate (with rectum and bladder as organs at risk), and for a spine case (with kidneys, liver, lung and heart as organs at risk) are presented. Overall, the results indicate that similar plan qualities for quadratic programming (QP) and rapidarc(TM) could be achieved at significantly more efficient computational and planning effort using QP. Additionally, results for the quasimodo phantom [Bohsung et al., "IMRT treatment planning: A comparative inter-system and inter-centre planning exercise of the estro quasimodo group," Radiother. Oncol. 76(3), 354-361 (2005)] are presented as an example for an extreme concave case. Quadratic programming is an alternative approach for inverse planning which generates clinically satisfying plans in comparison to the clinical system and constitutes an efficient optimization process characterized by uniqueness and reproducibility of the solution.

  17. 2016 Groundwater Monitoring and Inspection Report Gnome-Coach, New Mexico, Site January 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kreie, Ken; Findlay, Rick

    The Gnome-Coach, New Mexico, Site was the location of an underground nuclear test in 1961 and a groundwater tracer test in 1963. Residual contamination remaining in the subsurface from these events requires long-term oversight. The Long-Term Surveillance and Maintenance Plan for the site describes the U.S. Department of Energy Office of Legacy Management’s (LM’s) plan for monitoring groundwater (radiochemical sampling and hydraulic head measurements), inspecting the site, maintaining the site’s institutional controls, evaluating and reporting data, and documenting the site’s records and data management processes. Groundwater monitoring and site inspection activities are conducted annually. This report summarizes the results ofmore » these activities conducted during the October 2015 through September 2016 reporting period. The site inspection and annual sampling were conducted on January 27, 2016. At the time of the site inspection, the signs installed near the emplacement shaft, near well USGS-1, and around the perimeter of the site were observed as being in good condition, as were the roads, wellheads, and Project Gnome monument. No new groundwater extraction wells or oil and gas wells were installed during this reporting period on the site or in the sections that surround the site. One new application was received by the New Mexico Oil Conservation Division to install a salt water disposal well approximately 0.8 miles northeast of the Project Gnome monument. The proposed well has a planned completion depth of 15,500 feet below ground surface, but as of November 2016 a drill date has not been established.« less

  18. The Navruz Project: Transboundary Monitoring for Radionuclides and Metals in Central Asia Rivers. Sampling and Analysis Plan and Operational Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Passell, Howard D.; Barber, David S.; Betsill, J. David

    2002-04-02

    The transboundary nature of water resources demands a transboundary approach to their monitoring and management. However, transboundary water projects raise a challenging set of problems related to communication issues, and standardization of sampling, analysis and data management methods. This manual addresses those challenges and provides the information and guidance needed to perform the Navruz Project, a cooperative, transboundary, river monitoring project involving rivers and institutions in Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan facilitated by Sandia National Laboratories in the U.S. The Navruz Project focuses on waterborne radionuclides and metals because of their importance to public health and nuclear materials proliferation concernsmore » in the region. This manual provides guidelines for participants on sample and data collection, field equipment operations and procedures, sample handling, laboratory analysis, and data management. Also included are descriptions of rivers, sampling sites and parameters on which data are collected. Data obtained in this project are shared among all participating countries and the public through an internet web site, and are available for use in further studies and in regional transboundary water resource management efforts. Overall, the project addresses three main goals: to help increase capabilities in Central Asian nations for sustainable water resources management; to provide a scientific basis for supporting nuclear transparency and non-proliferation in the region; and to help reduce the threat of conflict in Central Asia over water resources, proliferation concerns, or other factors.« less

  19. Health and safety plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cofer, G.H.; Holt, V.L.; Roupe, G.W.

    1993-11-01

    This health and safety plan (HASP) was developed by the members of the Measurement Applications and Development Group of the Health Science Research Division at the Oak Ridge National Laboratory (ORNL). This plan was prepared to ensure that health and safety related items for the Waste Area Grouping (WAG) 2 Remedial Investigation (RI)/Feasibility Study and Site Investigation projects conform with the requirements of 29 CFR 1910.120 (April 18, 1992). The RI Plan calls for the characterization, monitoring, risk assessment, and identification of remedial needs and alternatives that have been structured and staged with short-term and long-term objectives. In early FYmore » 1992, the WAG 2 RI was integrated with the ORNL Environmental Restoration (ER) Site Investigations program in order to achieve the complimentary objectives of the projects more effectively by providing an integrated basis of support. The combined effort was named the WAG 2 Remedial Investigation and Site Investigations Program (WAG 2 RI&SI). The Site Investigation activities are a series of monitoring efforts and directed investigations that support other ER activities by providing information about (1) watershed hydrogeology; (2) contaminants, pathways, and fluxes for groundwater at ORNL; (3) shallow subsurface areas that can act as secondary sources of contaminants; and (4) biological populations and contaminants in biota, in addition to other support and coordination activities.« less

  20. Nonstructural urban stormwater quality measures: building a knowledge base to improve their use.

    PubMed

    Taylor, André C; Fletcher, Tim D

    2007-05-01

    This article summarizes a research project that investigated the use, performance, cost, and evaluation of nonstructural measures to improve urban stormwater quality. A survey of urban stormwater managers from Australia, New Zealand, and the United States revealed a widespread trend of increasing use of nonstructural measures among leading stormwater management agencies, with at least 76% of 41 types of nonstructural measures being found to be increasing in use. Data gathered from the survey, an international literature review, and a multicriteria analysis highlighted four nonstructural measures of greatest potential value: mandatory town planning controls that promote the adoption of low-impact development principles and techniques; development of strategic urban stormwater management plans for a city, shire, or catchment; stormwater management measures and programs for construction/building sites; and stormwater management activities related to municipal maintenance operations such as maintenance of the stormwater drainage network and manual litter collections. Knowledge gained on the use and performance of nonstructural measures from the survey, literature review, and three trial evaluation projects was used to develop tailored monitoring and evaluation guidelines for these types of measure. These guidelines incorporate a new evaluation framework based on seven alternative styles of evaluation that range from simply monitoring whether a nonstructural measure has been fully implemented to monitoring its impact on waterway health. This research helps to build the stormwater management industry's knowledge base concerning nonstructural measures and provides a practical tool to address common impediments associated with monitoring and evaluating the performance and cost of these measures.

  1. Factors promoting sustainability of education innovations: a comparison of faculty perceptions and existing frameworks.

    PubMed

    Loh, Lawrence C; Friedman, Stacey R; Burdick, William P

    2013-01-01

    Health professions education uses innovative projects to promote faculty development and institution change. Faculty perceptions of the factors that promote project sustainability affect how faculty conceptualize and implement their innovations, which influences whether and how they plan for sustainability. This paper compares educators' perceptions of factors that influence sustainability in innovative projects with factors identified in project sustainability literature, to identify areas of convergence and divergence. Using questionnaires, faculty development fellowship participants from Brazil and India shared their perceptions on factors influencing their project's sustainability. An analysis framework was developed from existing project sustainability literature; faculty responses were then coded through an iterative process. Key sustainability themes identified by faculty included project-level factors related to project design, stakeholder support, monitoring and evaluation, and project outcomes. Identified context level factors were related to institutional and governmental support as well as self-motivation and peer support. Availability of resources and funding were identified as relevant at both the project and context levels. Project-level factors were more often cited than context-level factors as key to ensuring sustainability. Faculty development efforts in health professions education should employ strategies to target these themes in promoting innovation sustainability. These include preengagement with institutional leaders, alignment with public sector goals, strategic diffusion of information, project expansion and transferability, capacity building in monitoring and evaluation, and creation of a community of educators for information exchange and support.

  2. The Method of Multiple Spatial Planning Basic Map

    NASA Astrophysics Data System (ADS)

    Zhang, C.; Fang, C.

    2018-04-01

    The "Provincial Space Plan Pilot Program" issued in December 2016 pointed out that the existing space management and control information management platforms of various departments were integrated, and a spatial planning information management platform was established to integrate basic data, target indicators, space coordinates, and technical specifications. The planning and preparation will provide supportive decision support, digital monitoring and evaluation of the implementation of the plan, implementation of various types of investment projects and space management and control departments involved in military construction projects in parallel to approve and approve, and improve the efficiency of administrative approval. The space planning system should be set up to delimit the control limits for the development of production, life and ecological space, and the control of use is implemented. On the one hand, it is necessary to clarify the functional orientation between various kinds of planning space. On the other hand, it is necessary to achieve "multi-compliance" of various space planning. Multiple spatial planning intergration need unified and standard basic map(geographic database and technical specificaton) to division of urban, agricultural, ecological three types of space and provide technical support for the refinement of the space control zoning for the relevant planning. The article analysis the main space datum, the land use classification standards, base map planning, planning basic platform main technical problems. Based on the geographic conditions, the results of the census preparation of spatial planning map, and Heilongjiang, Hainan many rules combined with a pilot application.

  3. Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry

    2005-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine themore » biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.« less

  4. Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry

    2004-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determinemore » the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.« less

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tyrrell, Evan; Denny, Angelita

    Fifty-two groundwater samples and one surface water sample were collected at the Monument Valley, Arizona, Processing Site to monitor groundwater contaminants for evaluating the effectiveness of the proposed compliance strategy as specified in the 1999 Final Site Observational Work Plan for the UMTRA Project Site at Monument Valley, Arizona. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and-analysis-plan-us-department- energy-office-legacy-management-sites). Samples were collected for metals, anions, nitrate + nitrite as N, and ammonia as N analyses at all locations.

  6. Construction safety monitoring based on the project's characteristic with fuzzy logic approach

    NASA Astrophysics Data System (ADS)

    Winanda, Lila Ayu Ratna; Adi, Trijoko Wahyu; Anwar, Nadjadji; Wahyuni, Febriana Santi

    2017-11-01

    Construction workers accident is the highest number compared with other industries and falls are the main cause of fatal and serious injuries in high rise projects. Generally, construction workers accidents are caused by unsafe act and unsafe condition that can occur separately or together, thus a safety monitoring system based on influencing factors is needed to achieve zero accident in construction industry. The dynamic characteristic in construction causes high mobility for workers while doing the task, so it requires a continuously monitoring system to detect unsafe condition and to protect workers from potential hazards. In accordance with the unique nature of project, fuzzy logic approach is one of the appropriate methods for workers safety monitoring on site. In this study, the focus of discussion is based on the characteristic of construction projects in analyzing "potential hazard" and the "protection planning" to be used in accident prevention. The data have been collected from literature review, expert opinion and institution of safety and health. This data used to determine hazard identification. Then, an application model is created using Delphi programming. The process in fuzzy is divided into fuzzification, inference and defuzzification, according to the data collection. Then, the input and final output data are given back to the expert for assessment as a validation of application model. The result of the study showed that the potential hazard of construction workers accident could be analysed based on characteristic of project and protection system on site and fuzzy logic approach can be used for construction workers accident analysis. Based on case study and the feedback assessment from expert, it showed that the application model can be used as one of the safety monitoring tools.

  7. Orbit Transfer Rocket Engine Technology Program: Advanced engine study, task D.1/D.3

    NASA Technical Reports Server (NTRS)

    Martinez, A.; Erickson, C.; Hines, B.

    1986-01-01

    Concepts for space maintainability of OTV engines were examined. An engine design was developed which was driven by space maintenance requirements and by a failure mode and effects (FME) analysis. Modularity within the engine was shown to offer cost benefits and improved space maintenance capabilities. Space operable disconnects were conceptualized for both engine change-out and for module replacement. Through FME mitigation the modules were conceptualized to contain the least reliable and most often replaced engine components. A preliminary space maintenance plan was developed around a controls and condition monitoring system using advanced sensors, controls, and condition monitoring concepts. A complete engine layout was prepared satisfying current vehicle requirements and utilizing projected component advanced technologies. A technology plan for developing the required technology was assembled.

  8. Status of India's population education programme--the subject of tripartite projects review and annual country review.

    PubMed

    1981-12-01

    A 3-step monitoring of India's population education program was undertaken in 1981 in order to determine the level of implementation and progress of the program. This monitoring program, conducted by the Unesco Mobile Team in collaboration with other institutions, followed 3 procedures: Project Progress Report (PPR); Tripartite Project Review (TPR); and Annual Country Review (ACR). The review meetings of the 10 state population education projects were organized at Chandigarh and Madras during August. The states covered in the review were Bihar, Haryana, Madhaya Pradesh, Punjab, Rajasthan, Chandigarh, Gujarat, Karnataka, Maharashtra, and Tamil Nadu. The Tripartite Review identified the following as problems which were hindering the smooth implementation of the population education program: 1) difficulty in spending funds unless certain formalities were completed by the governments of the states; 2) administrative problems such as getting printing paper for instructional materials, waiving the sales tax for equipment to be purchased under the project, and uncertainty regarding the admissible rates of per diem to be paid to the participants in various training programs; 3) the lack of experience of project staff; 4) problems created by having more than 1 cell in a state such as Rajasthan; and 5) an inadequate time frame within which the project should complete all its activities and make population education an integral part of the school system. The following were among the recommendations made: 1) the Project should be made coterminous with the 6th Five-Year Plan up to March 31, 1985; and 2) there should be only 1 Population Education Cell in every state. Among the points discussed at the annual country review, held during October, were the following: rephasing of the program from a 3 to 5 year project to synchronize it with the 6th plan; and the need for additional funds in view of inflation.

  9. 40 CFR 74.61 - Monitoring plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Monitoring plan. 74.61 Section 74.61... OPT-INS Monitoring Emissions: Combustion Sources § 74.61 Monitoring plan. (a) Monitoring plan. The... monitoring plan that includes the information required in a monitoring plan under § 75.53 of this chapter...

  10. DESIGN OF THE SEALEVEL SUSPENDED SOLIDS CONCENTRATION MONITORING SYSTEM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Unknown

    2001-09-17

    The SEAlevel project between Science & Engineering Associates, Inc. (SEA) and the National Energy Technology Laboratory (NETL) in Morgantown, WV (contract DE-AC21-96MC33126) began in direct response to a need expressed by personnel involved with monitoring fluid levels in underground storage tanks at the Hanford Tank Farms. Hanford expressed a desire for an automated monitoring system that could be installed into tanks through liquid observation wells (LOWs). The LOWs are pipes that run from the surface above the tank to the bottom of the tank. The end of the LOW pipe in the tank waste is sealed. Therefore, the LOW providesmore » a clean conduit through which sensors and monitors can be lowered into the tanks. When the SEAlevel project first began, it was understood that the LOWs would be of steel construction, because several existing LOWs at the time were steel pipes and the plans for all future LOW installations were to be with steel pipes. Based on this assumption the SEAlevel monitoring system was to be made using an array of acoustic sensors. However, during the course of the project it was learned that many existing LOWs are of fiberglass construction and that it was the desire of the Tanks Surveillance Group at Hanford to change plans so that all future LOW installations be of fiberglass construction. The Tanks Surveillance Group wanted fiberglass LOWs to allow for a wider range of sensors to be used in the pipes (i.e., sensors that use electromagnetic signals). In response to this, SEA pursued the development of other types of sensors to install in the LOWs in addition to the acoustic sensors that were being developed. It was determined that a capacitance type sensor was well suited for non-metallic LOW pipes. The results of the analysis, testing and design efforts that were undertaken to address the Hanford needs were detailed in a report submitted to the NETL on August 15, 1997, titled, The Sealevel Approach For Monitoring Liquid Levels In DOE Waste Storage and Processing Tanks.« less

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Doug Cathro

    The Lake Charles CCS Project is a large-scale industrial carbon capture and sequestration (CCS) project which will demonstrate advanced technologies that capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically the Lake Charles CCS Project will accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petroleum coke to chemicals plant (the LCC Gasification Project) and the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Lake Charles CCS Project will promote the expansion of EOR in Texas andmore » Louisiana and supply greater energy security by expanding domestic energy supplies. The capture, compression, pipeline, injection, and monitoring infrastructure will continue to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project are expected to be fulfilled by working through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 includes the studies attached hereto that will establish: the engineering design basis for the capture, compression and transportation of CO{sub 2} from the LCC Gasification Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Hastings oil field in Texas. The overall objective of Phase 2, provided a successful competitive down-selection, is to execute design, construction and operations of three capital projects: (1) the CO{sub 2} capture and compression equipment, (2) a Connector Pipeline from the LLC Gasification Project to the Green Pipeline owned by Denbury and an affiliate of Denbury, and (3) a comprehensive MVA system at the Hastings oil field.« less

  12. Development of near real time performance measurements for closed-loop signal systems (CLS) using historical traffic data from existing loop detectors and signal timing data.

    DOT National Transportation Integrated Search

    2014-10-01

    The overarching goal of this research project was to investigate the potential for the NCDOT Central Office Signal Timing : (COST) Section to monitor and assess the quality of field deployed closed-loop signal system plans using the data inherent in ...

  13. Adaptive Model-Predictive Motion Planning for Navigation in Complex Environments

    DTIC Science & Technology

    2009-08-01

    AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Carnegie Mellon University,The...Robotics Institute,Pittsburgh,PA,15213 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR...6 1.5 Assumptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 1.6 Organization

  14. JPRS Report: Environmental Issues

    DTIC Science & Technology

    1993-06-16

    Apr 93] ...................... 55 ITALY Environmental Monitoring Project for Amazonia Launched [Eduardo Cagnazzi; ITALIA OGGI, 10 May 93...about the importance of protecting the issued. ozone layer will be raised through TV, radio, newspaper and magazine campaigns. The government will also...being investigated . Office: Matters of study by the Planning Subcommittee Reforming the energy supply structure: Expanding (Meetings 3-5) of the

  15. CHAIN-project and installation of the flare monitoring telescopes in developing countries

    NASA Astrophysics Data System (ADS)

    Ueno, Satoru; Shibata, Kazunari; Kimura, Goichi; Nakatani, Yoshikazu; Kitai, Reizaburo; Nagata, Shin'ichi

    2007-12-01

    The Flare Monitoring Telescope (FMT) was constructed in 1992 at the Hida Observatory in Japan to investigate the long-term variation of solar activity and explosive events, as a project of the international coordinated observations programme (STEP). The FMT consists of five solar imaging telescopes and one guide telescope. The five telescopes simultaneously observe the full-disk Sun at different wavelengths around H-alpha absorption line or in different modes. Therefore, the FMT can measure the three-dimensional velocity field of moving structures on the full solar disk without the atmospheric seeing effect. The science target of the FMT is to monitor solar flares and erupting filaments continuously all over the solar disk and as many events as possible and to investigate the relationship between such phenomena and space weather. Now we are planning to start a new worldwide project called as ``Continuous H-alpha Imaging Network (CHAIN)-project''. As part of this project, we are examining the possibility of installing telescopes similar to the FMT in developing countries with cooperative help by the United Nations. We have selected Peru as the candidate country where the first oversea FMT will be installed, and are beginning to study the natural environment, the seeing conditions, the proper design of the telescope for Peru and the training and education programme of operating staff, etc.

  16. Water Reclamation and Reuse.

    PubMed

    Huang, Chunkai; Zeng, Ping; Yang, Sen; Shao, Yanxi; Liu, Yang

    2016-10-01

    A review of the literature published in 2015 on topics relating to water reclamation and reuse is presented. The review is divided into the following sections: (1) General: extent of reuse, research needs, guidelines and monitoring, health effects; (2) Treatment technologies: integrated process design, membrane treatment, membrane bioreactors, electrocoagulation, ion exchange and adsorption, disinfection, wetlands, managed aquifer recharge; (3) Planning and management: public acceptance and education, economics/pricing, water quality planning and management and project/case studies. Much of the water treatment research focuses on membrane treatment, integrated designs, and other innovative technologies.

  17. Umatilla Hatchery Monitoring and Evaluation, 1998-1999 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stonecypher, R. Wess; Groberg, Jr., Warren J.; Farman, Brett M.

    2001-07-01

    The Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program authorized construction of Umatilla Fish Hatchery (UFH) in 1986. Measure 703 of the program amended the original authorization for the hatchery and specified evaluation of the Michigan (MI) raceways using oxygen supplementation to reach production goals of 290,000 lb of chinook salmon (Oncorhynchus tshawytscha) and steelhead (O. mykiss). The hatchery was completed in fall 1991. Partial justification for the hatchery was to evaluate new production and supplementation techniques. MI raceways at UFH increase smolt production with a limited water supply. Test results for MI raceways will have systematicmore » application in the Columbia River basin. The UFH is the foundation for rehabilitating chinook salmon and enhancing steelhead in the Umatilla River (CTUIR and ODFW 1990) and is expected to contribute significantly to the Northwest Power Planning Council's goal of doubling salmon production in the Columbia Basin. Hatchery production goals and a comprehensive monitoring and evaluation plan were presented in the Umatilla Hatchery Master Plan (CTUIR and ODFW 1990). The Comprehensive Plan for Monitoring and Evaluation of Umatilla Hatchery (Carmichael 1990) was approved by the Northwest Power Planning Council as a critical adaptive management guide for fisheries rehabilitation in the Umatilla River. Monitoring and evaluation will be used to increase knowledge about uncertainties inherent in the fisheries rehabilitation and will complement the developing systematic monitoring and evaluation program. The monitoring and evaluation goals are: (1) Provide information and recommendations for the culture and release of hatchery fish, harvest regulations, and natural escapement to accomplish long-term natural and hatchery production goals in the Umatilla River basin that are consistent with provisions of the Council's Columbia River Basin Fish and Wildlife Program. (2) Assess the success of achieving the management objectives in the Umatilla River basin that are presented in the Master Plan and the Comprehensive Rehabilitation Plan. A substantial proportion of the production at UFH is reared in MI raceways. This system has not been thoroughly evaluated to determine the effects on Smolt-to-adult survival (SAS). In addition, the rearing strategies proposed for spring chinook salmon require an unusually extensive period of incubation in chilled well water. Extensive background and justification for UFH monitoring and evaluation is presented in Carmichael (1990). In this report, we present findings for the UFH Monitoring and Evaluation Project from 1 November 1998 to 31 October 1999. We designed our program to evaluate fish cultural practices, conduct rearing and survival studies, assess sport fisheries, and provide information for planning and coordination. Additional studies have been designed for fall chinook salmon to evaluate straying and the effects of tagging. We monitored the culture and performance of more than 3.2 million chinook salmon and steelhead produced at UFH in 1997-98 (Appendix Tables A1-8). Individual stock profiles, release, performance, and return data of previously released groups are presented in the following sections.« less

  18. Integrated Geophysical Monitoring Program to Study Flood Performance and Incidental CO2 Storage Associated with a CO2 EOR Project in the Bell Creek Oil Field

    NASA Astrophysics Data System (ADS)

    Burnison, S. A.; Ditty, P.; Gorecki, C. D.; Hamling, J. A.; Steadman, E. N.; Harju, J. A.

    2013-12-01

    The Plains CO2 Reduction (PCOR) Partnership, led by the Energy & Environmental Research Center, is working with Denbury Onshore LLC to determine the effect of a large-scale injection of carbon dioxide (CO2) into a deep clastic reservoir for the purpose of simultaneous CO2 enhanced oil recovery (EOR) and to study incidental CO2 storage at the Bell Creek oil field located in southeastern Montana. This project will reduce CO2 emissions by more than 1 million tons a year while simultaneously recovering an anticipated 30 million barrels of incremental oil. The Bell Creek project provides a unique opportunity to use and evaluate a comprehensive suite of technologies for monitoring, verification, and accounting (MVA) of CO2 on a large-scale. The plan incorporates multiple geophysical technologies in the presence of complementary and sometimes overlapping data to create a comprehensive data set that will facilitate evaluation and comparison. The MVA plan has been divided into shallow and deep subsurface monitoring. The deep subsurface monitoring plan includes 4-D surface seismic, time-lapse 3-D vertical seismic profile (VSP) surveys incorporating a permanent borehole array, and baseline and subsequent carbon-oxygen logging and other well-based measurements. The goal is to track the movement of CO2 in the reservoir, evaluate the recovery/storage efficiency of the CO2 EOR program, identify fluid migration pathways, and determine the ultimate fate of injected CO2. CO2 injection at Bell Creek began in late May 2013. Prior to injection, a monitoring and characterization well near the field center was drilled and outfitted with a distributed temperature-monitoring system and three down-hole pressure gauges to provide continuous real-time data of the reservoir and overlying strata. The monitoring well allows on-demand access for time-lapse well-based measurements and borehole seismic instrumentation. A 50-level permanent borehole array of 3-component geophones was installed in a second monitoring well. A pre-injection series of carbon-oxygen logging across the reservoir was acquired in 35 wells. The baseline 3-D surface seismic survey was acquired in September 2012. A 3-D VSP incorporating two wells and 2 square miles of overlapping seismic coverage in the middle of the field was acquired in May 2013. Initial iterations of geologic modeling and reservoir simulation of the field have been completed. Currently, passive seismic monitoring with the permanent borehole array is being conducted during injection. Interpretation results from the baseline surface 3-D survey and preliminary results from the baseline 3-D VSP are being evaluated and integrated into the reservoir model. The PCOR Partnership's philosophy is to combine site characterization, modeling, and monitoring strategies into an iterative process to produce descriptive integrated results. The comprehensive effort at Bell Creek will allow a comparison of the effectiveness of several complementary geophysical and well-based methods in meeting the goals of the deep subsurface monitoring effort.

  19. Planning and Management of Real-Time Geospatialuas Missions Within a Virtual Globe Environment

    NASA Astrophysics Data System (ADS)

    Nebiker, S.; Eugster, H.; Flückiger, K.; Christen, M.

    2011-09-01

    This paper presents the design and development of a hardware and software framework supporting all phases of typical monitoring and mapping missions with mini and micro UAVs (unmanned aerial vehicles). The developed solution combines state-of-the art collaborative virtual globe technologies with advanced geospatial imaging techniques and wireless data link technologies supporting the combined and highly reliable transmission of digital video, high-resolution still imagery and mission control data over extended operational ranges. The framework enables the planning, simulation, control and real-time monitoring of UAS missions in application areas such as monitoring of forest fires, agronomical research, border patrol or pipeline inspection. The geospatial components of the project are based on the Virtual Globe Technology i3D OpenWebGlobe of the Institute of Geomatics Engineering at the University of Applied Sciences Northwestern Switzerland (FHNW). i3D OpenWebGlobe is a high-performance 3D geovisualisation engine supporting the web-based streaming of very large amounts of terrain and POI data.

  20. Diagnostic Systems Plan for the Advanced Light Source Top-OffUpgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barry, Walter; Chin, Mike; Robin, David

    2005-05-10

    The Advanced Light Source (ALS) will soon be upgraded to enable top-off operations [1], in which electrons are quasi-continuously injected to produce constant stored beam current. The upgrade is structured in two phases. First, we will upgrade our injector from 1.5 GeV to 1.9 GeV to allow full energy injection and will start top-off operations. In the second phase, we will upgrade the Booster Ring (BR) with a bunch cleaning system to allow high bunch purity top-off injection. A diagnostics upgrade will be crucial for success in both phases of the top-off project, and our plan for it is describedmore » in this paper. New booster ring diagnostics will include updated beam position monitor (BPM) electronics, a tune monitoring system, and a new scraper. Two new synchrotron light monitors and a beam stop will be added to the booster-to-storage ring transfer line (BTS), and all the existing beam current monitors along the accelerator chain will be integrated into a single injection efficiency monitoring application. A dedicated bunch purity monitor will be installed in the storage ring (SR). Together, these diagnostic upgrades will enable smooth commissioning of the full energy injector and a quick transition to high quality top-off operation at the ALS.« less

  1. Reviewing the quality of strategic environmental assessment reports for English spatial plan core strategies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fischer, Thomas B., E-mail: fischer@liverpool.ac.u

    This paper summarises the results of a research project from early 2008, involving the author of this paper, as well as 18 post-graduate University of Liverpool students, in which the quality of European Directive based strategic environmental assessment (SEA) reports of English spatial plan core strategies (conducted within the context of the spatial planning sustainability appraisal-SA-regime) was reviewed. The project aimed at establishing the extensiveness of emerging spatial plan related SEA practice, as well as highlighting shortcomings and problems. Overall, it was found that whilst some aspects of assessment were done well, others were not of a satisfactory quality. Shortcomingsmore » were connected particularly with the practice of listing potentially relevant baseline documents and data without distinguishing sufficiently between those that are important in terms of significant impacts and those that are not. Problems were also found to exist with the evaluation of options and impacts, the consideration of substantive aspects, such as health, as well as regarding the formulation of final recommendations and monitoring.« less

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental LLC; Environmental Compliance Department Environment, Safety, and Health Division Y-12 National Security Complex

    This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with themore » multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of BWXT Y-12, L.L.C. (hereafter referenced as BWXT), the Y-12 management and operations (M&O) contractor for DOE. This GWPP management plan addresses the requirements of DOE Order 450.1 (BWXT Y12 S/RID) regarding the implementation of a site-wide approach for groundwater protection at each DOE facility. Additionally, this plan is a ''living'' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.« less

  3. A long-term study of ecological impacts of river channelization on the population of an endangered fish: Lessons learned for assessment and restoration

    USGS Publications Warehouse

    Roberts, James H.; Anderson, Gregory B.; Angermeier, Paul

    2016-01-01

    Projects to assess environmental impact or restoration success in rivers focus on project-specific questions but can also provide valuable insights for future projects. Both restoration actions and impact assessments can become “adaptive” by using the knowledge gained from long-term monitoring and analysis to revise the actions, monitoring, conceptual model, or interpretation of findings so that subsequent actions or assessments are better informed. Assessments of impact or restoration success are especially challenging when the indicators of interest are imperiled species and/or the impacts being addressed are complex. From 1997 to 2015, we worked closely with two federal agencies to monitor habitat availability for and population density of Roanoke logperch (Percina rex), an endangered fish, in a 24-km-long segment of the upper Roanoke River, VA. We primarily used a Before-After-Control-Impact analytical framework to assess potential impacts of a river channelization project on the P. rex population. In this paper, we summarize how our extensive monitoring facilitated the evolution of our (a) conceptual understanding of the ecosystem and fish population dynamics; (b) choices of ecological indicators and analytical tools; and (c) conclusions regarding the magnitude, mechanisms, and significance of observed impacts. Our experience with this case study taught us important lessons about how to adaptively develop and conduct a monitoring program, which we believe are broadly applicable to assessments of environmental impact and restoration success in other rivers. In particular, we learned that (a) pre-treatment planning can enhance monitoring effectiveness, help avoid unforeseen pitfalls, and lead to more robust conclusions; (b) developing adaptable conceptual and analytical models early was crucial to organizing our knowledge, guiding our study design, and analyzing our data; (c) catchment-wide processes that we did not monitor, or initially consider, had profound implications for interpreting our findings; and (d) using multiple analytical frameworks, with varying assumptions, led to clearer interpretation of findings than the use of a single framework alone. Broader integration of these guiding principles into monitoring studies, though potentially challenging, could lead to more scientifically defensible assessments of project effects.

  4. The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Young, Ralph

    One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can findmore » themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site-specific, enforceable regulatory milestones, they can provide a comprehensive work plan for not only the board, but also regulators, site contractors, and DOE. Because the work plans are reviewed and approved by DOE, they carry some weight in holding local boards of the EM SSAB accountable. This structure provides the basis for local boards to achieve their primary function, to provide DOE with information, advice, and recommendations concerning issues affecting the EM program at the site. (authors)« less

  5. Productivity of Spring Chinook Salmon and Summer Steelhead in the John Day River Basin, 2008 Annual Technical Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, Wayne H.; Schricker, Jaym'e; Ruzychi, James R.

    The John Day River subbasin supports one of the last remaining intact wild populations of spring Chinook salmon and summer steelhead in the Columbia River Basin. These populations remain depressed relative to historic levels and limited information is available for steelhead life history. Numerous habitat protection and rehabilitation projects have been implemented in the basin to improve salmonid freshwater production and survival. However, these projects often lack effectiveness monitoring. While our monitoring efforts outlined here will not specifically measure the effectiveness of any particular project, they will provide much needed programmatic or watershed (status and trend) information to help evaluatemore » project-specific effectiveness monitoring efforts as well as meet some data needs as index stocks. Our continued monitoring efforts to estimate salmonid smolt abundance, age structure, SAR, smolts/redd, freshwater habitat use, and distribution of critical life states will enable managers to assess the long-term effectiveness of habitat projects and to differentiate freshwater and ocean survival. Because Columbia Basin managers have identified the John Day subbasin spring Chinook population as an index population for assessing the effects of alternative future management actions on salmon stocks in the Columbia Basin (Schaller et al. 1999) we continue our ongoing studies. This project is high priority based on the level of emphasis by the NWPPC Fish and Wildlife Program, Independent Scientific Advisory Board (ISAB), Independent Scientific Review Panel (ISRP), NOAA National Marine Fisheries Service (NMFS), and the Oregon Plan for Salmon and Watersheds (OWEB). Each of these groups have placed priority on monitoring and evaluation to provide the real-time data to guide restoration and adaptive management in the region. The objective is to estimate smolt-to-adult survival rates (SAR) and out-migrant abundance for spring Chinook Oncorhynchus tshawytscha and summer steelhead O. mykiss and life history characteristics of summer steelhead.« less

  6. Configuration management issues and objectives for a real-time research flight test support facility

    NASA Technical Reports Server (NTRS)

    Yergensen, Stephen; Rhea, Donald C.

    1988-01-01

    An account is given of configuration management activities for the Western Aeronautical Test Range (WATR) at NASA-Ames, whose primary function is the conduct of aeronautical research flight testing through real-time processing and display, tracking, and communications systems. The processing of WATR configuration change requests for specific research flight test projects must be conducted in such a way as to refrain from compromising the reliability of WATR support to all project users. Configuration management's scope ranges from mission planning to operations monitoring and performance trend analysis.

  7. BER balanced program plan: oil shale technology. [23 suggested biomedical and environmental research projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schulte, H.F.; Stoker, A.K.; Campbell, E.E.

    1976-06-01

    Oil shale technology has been divided into two sub-technologies: surface processing and in-situ processing. Definition of the research programs is essentially an amplification of the five King-Muir categories: (A) pollutants: characterization, measurement, and monitoring; (B) physical and chemical processes and effects; (C) health effects; (D) ecological processes and effects; and (E) integrated assessment. Twenty-three biomedical and environmental research projects are described as to program title, scope, milestones, technolgy time frame, program unit priority, and estimated program unit cost.

  8. VLBI2010 in NASA's Space Geodesy Project

    NASA Technical Reports Server (NTRS)

    Ma, Chopo

    2012-01-01

    In the summer of 20 11 NASA approved the proposal for the Space Geodesy Project (SGP). A major element is developing at the Goddard Geophysical and Astronomical Observatory a prototype of the next generation of integrated stations with co-located VLBI, SLR, GNSS and DORIS instruments as well as a system for monitoring the vector ties. VLBI2010 is a key component of the integrated station. The objectives ofSGP, the role of VLBI20 lOin the context of SGP, near term plans and possible future scenarios will be discussed.

  9. A Philippine experiment in community development.

    PubMed

    1986-06-01

    For years, villages in the towns of La Trinidad and Tuba in the Philippine province of Benguet suffered from several serious health problems. The use of "entry points" or projects which yield immediate tangible results within a short period of time was introduced in the municipalities of La Trinidat and Tuba in 1981. A year later, 9 additional pilot areas were selected. Today, these cities and municipalities form the nucleus of a new and promising experiment in community development, i.e., the Integrated Family Planning/Maternal Child Health Project, jointly sponsored by the Philippines' Commission on Population (POPCOM) and the Japan International Cooperating Agency (JICA). Generally, the project aims to strengththen and expand community-based family planning and maternal and child health services in the project areas that aim to improve the health of the residents. Specifically, it seeks to achieve several objectives: increase the rate of family planning acceptance and decrease the dropout rate in family planning participation within the community; decrease the incidence of malnutrition among preschool and school age children; and decrease the intestinal parasite infection rae in the community. In the field, these objectives are translated into concrete activities which people, especially in remote rural areas, can readily understand. Children, who are the center of love and attention in every home, are introduced to services which produce immediate results: growth monitoring, breastfeeding and nutrition, immunization, and cure of common childhood diseases. Deworming and its marked and immediate reslutls establish and increase the credibility of family planning, health, and other fieldworkers in the areas. The health development services break the barrier of resistance on the part of parents and adults. Once the population and health workers establish rapport with the community, they introduce family planning concepts and techniques, environmental sanitation projects, and income generating projects. In June 1985, POPCOM commissioned an independent research agency to evaluate the impact of the integrated project in the 2 model areas. The study, conducted from June 30 to July 31, 1985, consisted of a survey, an evaluation workshop, and library research. The main findings included: there was a marked increase in the number of breastfeeding mothers in both La Trinidad and Tuba; both municipalities showed a decrease in the number of postnatal care cases; maternal mortality went down to zero throughout the survey period; there was a consistent upward trend in the prevalence of family planning. Based on reports from the projects areas, 27,744 children aged 0-4 had undergone stool examination. Of these, 25,963 or 93% were treated. Other major accomplishments of the project are cited.

  10. Tackling Millennium Development Goals (MDGs) 4 and 5: The National Health Insurance Scheme (NHIS) Approach in Nigeria.

    PubMed

    Mohammed, Shafiu; Dong, Hengjin

    2012-03-07

    Developing countries are devising various strategies and mechanisms to accelerate their speed towards the Millennium Development Goals (MDGs) by 2015. In Nigeria, different approaches have been used to address the tackling of health-related MDGs. One creative approach has been the implementation of the NHIS Maternal and Child Health (NHIS-MCH) Project. The project aims to speed up the achievement of MDGs 4 and 5 (reducing child mortality and improving maternal health) in the country. Little is known about the NHIS-MCH Project's design and health insurance coverage activities. Project planning and monitoring could be hampered by lack of technical and managerial skills of health insurance most especially at middle and local levels. Challenging debates continue to emanate on the project's sustainability.

  11. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    NASA Astrophysics Data System (ADS)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  12. Ecological Monitoring and Compliance Program Fiscal Year 2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. A. Wills

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2001. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conductedmore » for 23 NTS projects. Eleven sites were in desert tortoise habitat. These projects have the potential to disturb a total of 588 acres, where 568 acres of disturbance would be off-road driving. No tortoises were found in or displaced from project areas, and no tortoise s were accidentally injured or killed at project areas. One tortoise was crushed by a vehicle on a paved road. A topical report describing the classification of habitat types on the NTS was completed and distributed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. Compilation of historical wildlife data was initiated. A long-term monitoring plan for important plant species that occur on the NTS was completed. Site-wide monitoring was conducted for the western burrowing owl, bat species of concern, wild horses, and raptor nests. Sixty-nine of 77 known owl burrows were monitored. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid March to early April. A total of 55 juvenile owls was detected from 11 breeding pairs. Pellet analysis of burrowing owls was completed which identified key prey species. A total of 272 bats, representing 10 bat species were captured in mist-nets at water sources in the Great Basin Desert ecoregion. Bats were detected with the Anabat II call-recording system at water sources and selected tunnel and mine entrances. Thirty-seven adult horses and 11 foals were counted this year. Two of the eleven foals observed last year survived to yearlings. Seven active raptor nests were found and monitored this year. These included two Great-horned Owl nests, three Barn Owl nests, and two Red-tailed Hawk nests. Selected wetlands and man-made water sources were monitored for physical parameters and wildlife use. No dead animals were observed this year in any plastic-lined sump. The chemical spill test plans for four experiments at the HAZMAT Spill Center were reviewed for their potential to impact biota downwind of spills on Frenchman Lake playa.« less

  13. Trend analyses of sediment data for the DEC project

    USGS Publications Warehouse

    Rebich, Richard Allen

    1995-01-01

    Daily stream discharge, suspended-sediment concentration, and suspended-sediment discharge data were collected at eight sites in six watersheds of the Demonstration Erosion Control project in the Yazoo River Basin in north-central Mississippi during the period July 1985 through September 1991. The project is part of an ongoing interagency program of planning, design, construction, monitoring, and evaluation to alleviate flooding, erosion, sedimentation, and water-quality problems for watersheds located in the bluff hills upstream of the Mississippi River alluvial plain. This paper presents preliminary results of trend analyses for stream discharge and sediment data for the eight project sites. More than 550 stream discharge measurements and 20,000 suspended-sediment samples have been collected at the eight sites since 1985.

  14. Advanced Ground Systems Maintenance Physics Models For Diagnostics Project

    NASA Technical Reports Server (NTRS)

    Perotti, Jose M.

    2015-01-01

    The project will use high-fidelity physics models and simulations to simulate real-time operations of cryogenic and systems and calculate the status/health of the systems. The project enables the delivery of system health advisories to ground system operators. The capability will also be used to conduct planning and analysis of cryogenic system operations. This project will develop and implement high-fidelity physics-based modeling techniques tosimulate the real-time operation of cryogenics and other fluids systems and, when compared to thereal-time operation of the actual systems, provide assessment of their state. Physics-modelcalculated measurements (called “pseudo-sensors”) will be compared to the system real-timedata. Comparison results will be utilized to provide systems operators with enhanced monitoring ofsystems' health and status, identify off-nominal trends and diagnose system/component failures.This capability can also be used to conduct planning and analysis of cryogenics and other fluidsystems designs. This capability will be interfaced with the ground operations command andcontrol system as a part of the Advanced Ground Systems Maintenance (AGSM) project to helpassure system availability and mission success. The initial capability will be developed for theLiquid Oxygen (LO2) ground loading systems.

  15. CRMS vegetation analytical team framework: Methods for collection, development, and use of vegetation response variables

    USGS Publications Warehouse

    Cretini, Kari F.; Visser, Jenneke M.; Krauss, Ken W.; Steyer, Gregory D.

    2011-01-01

    This document identifies the main objectives of the Coastwide Reference Monitoring System (CRMS) vegetation analytical team, which are to provide (1) collection and development methods for vegetation response variables and (2) the ways in which these response variables will be used to evaluate restoration project effectiveness. The vegetation parameters (that is, response variables) collected in CRMS and other coastal restoration projects funded under the Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) are identified, and the field collection methods for these parameters are summarized. Existing knowledge on community and plant responses to changes in environmental drivers (for example, flooding and salinity) from published literature and from the CRMS and CWPPRA monitoring dataset are used to develop a suite of indices to assess wetland condition in coastal Louisiana. Two indices, the floristic quality index (FQI) and a productivity index, are described for herbaceous and forested vegetation. The FQI for herbaceous vegetation is tested with a long-term dataset from a CWPPRA marsh creation project. Example graphics for this index are provided and discussed. The other indices, an FQI for forest vegetation (that is, trees and shrubs) and productivity indices for herbaceous and forest vegetation, are proposed but not tested. New response variables may be added or current response variables removed as data become available and as our understanding of restoration success indicators develops. Once indices are fully developed, each will be used by the vegetation analytical team to assess and evaluate CRMS/CWPPRA project and program effectiveness. The vegetation analytical teams plan to summarize their results in the form of written reports and/or graphics and present these items to CRMS Federal and State sponsors, restoration project managers, landowners, and other data users for their input.

  16. An Analysis of a Computerized System for Managing Curriculum Decisions and Tracking Student Progress in a Home-Based Pre-School Education Project.

    ERIC Educational Resources Information Center

    Lutz, John E.; And Others

    The degree of success of the computerized Child-Based Information System (CBIS) was analyzed in two areas--presenting, delivering, and managing a developmental curriculum; and recording, filing, and monitoring child tracking data, including requirements for Individualized Education Plans (IEP's). Preschool handicapped and high-risk children and…

  17. Microbiological, Geochemical and Hydrologic Processes Controlling Uranium Mobility: An Integrated Field-Scale Subsurface Research Challenge Site at Rifle, Colorado, Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The U.S. Department of Energy (DOE) is cleaning up and/or monitoring large, dilute plumes contaminated by metals, such as uranium and chromium, whose mobility and solubility change with redox status. Field-scale experiments with acetate as the electron donor have stimulated metal-reducing bacteria to effectively remove uranium [U(VI)] from groundwater at the Uranium Mill Tailings Site in Rifle, Colorado. The Pacific Northwest National Laboratory and a multidisciplinary team of national laboratory and academic collaborators has embarked on a research proposed for the Rifle site, the object of which is to gain a comprehensive and mechanistic understanding of the microbial factors andmore » associated geochemistry controlling uranium mobility so that DOE can confidently remediate uranium plumes as well as support stewardship of uranium-contaminated sites. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Rifle Integrated Field-Scale Subsurface Research Challenge Project.« less

  18. Voluntary Truck and Bus Fuel-Economy-Program marketing plan. Final technical report, September 29, 1980-January 29, 1982

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The aim of the program is to improve the utilization of fuel by commercial trucks and buses by updating and implementing specific approaches for educating and monitoring the trucking industry on methods and means of conserving fuels. The following outlines the marketing plan projects: increase use of program logo by voluntary program members and others; solicit trade publication membership and support; brief Congressional delegations on fuel conservation efforts; increase voluntary program presence before trade groups; increase voluntary program presence at truck and trade shows; create a voluntary program display for use at trade shows and in other areas; review voluntarymore » program graphics; increase voluntary program membership; and produce placemats carrying fuel conservation messages; produce a special edition of Fuel Economy News, emphasizing the driver's involvement in fuel conservation; produce posters carrying voluntary program fuel conservation message. Project objectives, activities, and results for each project are summarized.« less

  19. Oppenheimer's Box of Chocolates: Remediation of the Manhattan Project Landfill at Los Alamos National Laboratory - 12283

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allen, Donald L.; Ramsey, Susan S.; Finn, Kevin P.

    2012-07-01

    Material Disposal Area B (MDA B) is the oldest radioactive waste disposal facility at Los Alamos National Laboratory. Operated from 1944-48, MDA B was the disposal facility for the Manhattan Project. Recognized as one of the most challenging environmental remediation projects at Los Alamos, the excavation of MDA B received $110 million from the American Recovery and Reinvestment Act of 2009 to accelerate this complex remediation work. Several factors combined to create significant challenges to remediating the landfill known in the 1940's as the 'contaminated dump'. The secrecy surrounding the Manhattan Project meant that no records were kept of radiologicalmore » materials and chemicals disposed or of the landfill design. An extensive review of historical documents and interviews with early laboratory personnel resulted in a list of hundreds of hazardous chemicals that could have been buried in MDA B. Also, historical reports of MDA B spontaneously combusting on three occasions -with 50-foot flames and pink smoke spewing across the mesa during the last incident in 1948-indicated that hazardous materials were likely present in MDA B. To complicate matters further, though MDA B was located on an isolated mesa in the 1940's, the landfill has since been surrounded by a Los Alamos commercial district. The local newspaper, hardware store and a number of other businesses are located directly across the street from MDA B. This close proximity to the public and the potential for hazardous materials in MDA B necessitated conducting remediation work within protective enclosures. Potential chemical hazards and radiological inventory were better defined using a minimally intrusive sampling method called direct push technology (DPT) prior to excavation. Even with extensive sampling and planning the project team encountered many surprises and challenges during the project. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. More than three years of effort by the LANL project team went into the planning for remediation of Material Disposal Area B. Hundreds of historical documents were reviewed; retired personnel were extensively interviewed and noninvasive techniques were used to characterize the site. The information collected was incorporated into the safety requirements, cost estimate, schedule and primary execution plan for the project. Ultimately the waste volume managed by the project approached 40000 m{sup 3}, more than double the original project estimate. This increase had a major impact on both project cost and schedule. Nuclear safety requirements for the project were based on an estimated MDA B radionuclide inventory of 12 PE-Ci. When excavation was complete over 123 PE-Ci had been removed from the trenches. The radionuclide inventory at MDA B was an order of magnitude higher than estimated. Work at MDA B could not have proceeded without the safety basis exemption from DOE-HQ. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. (authors)« less

  20. Planning an integrated agriculture and health program and designing its evaluation: Experience from Western Kenya.

    PubMed

    Cole, Donald C; Levin, Carol; Loechl, Cornelia; Thiele, Graham; Grant, Frederick; Girard, Aimee Webb; Sindi, Kirimi; Low, Jan

    2016-06-01

    Multi-sectoral programs that involve stakeholders in agriculture, nutrition and health care are essential for responding to nutrition problems such as vitamin A deficiency among pregnant and lactating women and their infants in many poor areas of lower income countries. Yet planning such multi-sectoral programs and designing appropriate evaluations, to respond to different disciplinary cultures of evidence, remain a challenge. We describe the context, program development process, and evaluation design of the Mama SASHA project (Sweetpotato Action for Security and Health in Africa) which promoted production and consumption of a bio-fortified, orange-fleshed sweetpotato (OFSP). In planning the program we drew upon information from needs assessments, stakeholder consultations, and a first round of the implementation evaluation of a pilot project. The multi-disciplinary team worked with partner organizations to develop a program theory of change and an impact pathway which identified aspects of the program that would be monitored and established evaluation methods. Responding to the growing demand for greater rigour in impact evaluations, we carried out quasi-experimental allocation by health facility catchment area, repeat village surveys for assessment of change in intervention and control areas, and longitudinal tracking of individual mother-child pairs. Mid-course corrections in program implementation were informed by program monitoring, regular feedback from implementers and partners' meetings. To assess economic efficiency and provide evidence for scaling we collected data on resources used and project expenses. Managing the multi-sectoral program and the mixed methods evaluation involved bargaining and trade-offs that were deemed essential to respond to the array of stakeholders, program funders and disciplines involved. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.

  1. Project for the development of the linac based NCT facility in University of Tsukuba.

    PubMed

    Kumada, H; Matsumura, A; Sakurai, H; Sakae, T; Yoshioka, M; Kobayashi, H; Matsumoto, H; Kiyanagi, Y; Shibata, T; Nakashima, H

    2014-06-01

    A project team headed by University of Tsukuba launched the development of a new accelerator based BNCT facility. In the project, we have adopted Radio-Frequency Quadrupole (RFQ)+Drift Tube Linac (DTL) type linac as proton accelerators. Proton energy generated from the linac was set to 8MeV and average current was 10mA. The linac tube has been constructed by Mitsubishi Heavy Industry Co. For neutron generator device, beryllium is selected as neutron target material; high intensity neutrons are generated by the reaction with beryllium and the 80kW proton beam. Our team chose beryllium as the neutron target material. At present beryllium target system is being designed with Monte-Carlo estimations and heat analysis with ANSYS. The neutron generator consists of moderator, collimator and shielding. It is being designed together with the beryllium target system. We also acquired a building in Tokai village; the building has been renovated for use as BNCT treatment facility. It is noteworthy that the linac tube had been installed in the facility in September 2012. In BNCT procedure, several medical devices are required for BNCT treatment such as treatment planning system, patient positioning device and radiation monitors. Thus these are being developed together with the linac based neutron source. For treatment planning system, we are now developing a new multi-modal Monte-Carlo treatment planning system based on JCDS. The system allows us to perform dose estimation for BNCT as well as particle radiotherapy and X-ray therapy. And the patient positioning device can navigate a patient to irradiation position quickly and properly. Furthermore the device is able to monitor movement of the patient׳s position during irradiation. Copyright © 2014 Elsevier Ltd. All rights reserved.

  2. Planning an integrated agriculture and health program and designing its evaluation: Experience from Western Kenya

    PubMed Central

    Cole, Donald C.; Levin, Carol; Loechl, Cornelia; Thiele, Graham; Grant, Frederick; Girard, Aimee Webb; Sindi, Kirimi; Low, Jan

    2016-01-01

    Multi-sectoral programs that involve stakeholders in agriculture, nutrition and health care are essential for responding to nutrition problems such as vitamin A deficiency among pregnant and lactating women and their infants in many poor areas of lower income countries. Yet planning such multi-sectoral programs and designing appropriate evaluations, to respond to different disciplinary cultures of evidence, remain a challenge. We describe the context, program development process, and evaluation design of the Mama SASHA project (Sweetpotato Action for Security and Health in Africa) which promoted production and consumption of a bio-fortified, orange-fleshed sweetpotato (OFSP). In planning the program we drew upon information from needs assessments, stakeholder consultations, and a first round of the implementation evaluation of a pilot project. The multi-disciplinary team worked with partner organizations to develop a program theory of change and an impact pathway which identified aspects of the program that would be monitored and established evaluation methods. Responding to the growing demand for greater rigour in impact evaluations, we carried out quasi-experimental allocation by health facility catchment area, repeat village surveys for assessment of change in intervention and control areas, and longitudinal tracking of individual mother-child pairs. Mid-course corrections in program implementation were informed by program monitoring, regular feedback from implementers and partners’ meetings. To assess economic efficiency and provide evidence for scaling we collected data on resources used and project expenses. Managing the multi-sectoral program and the mixed methods evaluation involved bargaining and trade-offs that were deemed essential to respond to the array of stakeholders, program funders and disciplines involved. PMID:27003730

  3. The Walla Walla Basin Natural Production Monitoring and Evaluation Project : Progress Report, 1999-2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Contor, Craig R.; Sexton, Amy D.

    2003-06-02

    The Walla Walla Basin Natural Production Monitoring and Evaluation Project (WWNPME) was funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) under the Walla Walla Basin Natural Production Monitoring and Evaluation Project (WWNPME).more » Chapter One provides an overview of the entire report and how the objectives of each statement of work from 1999, 2000, 2001, and 2002 contract years are organized and reported. Chapter One also provides background information relevant to the aquatic resources of the Walla Walla River Basin. Objectives are outlined below for the statements of work for the 1999, 2000, 2001 and 2002 contract years. The same objectives were sometimes given different numbers in different years. Because this document is a synthesis of four years of reporting, we gave objectives letter designations and listed the objective number associated with the statement of work for each year. Some objectives were in all four work statements, while other objectives were in only one or two work statements. Each objective is discussed in a chapter. The chapter that reports activities and findings of each objective are listed with the objective below. Because data is often interrelated, aspects of some findings may be reported or discussed in more than one chapter. Specifics related to tasks, approaches, methods, results and discussion are addressed in the individual chapters.« less

  4. An assessment of PERT as a technique for schedule planning and control

    NASA Technical Reports Server (NTRS)

    Sibbers, C. W.

    1982-01-01

    The PERT technique including the types of reports which can be computer generated using the NASA/LaRC PPARS System is described. An assessment is made of the effectiveness of PERT on various types of efforts as well as for specific purposes, namely, schedule planning, schedule analysis, schedule control, monitoring contractor schedule performance, and management reporting. This assessment is based primarily on the author's knowledge of the usage of PERT by NASA/LaRC personnel since the early 1960's. Both strengths and weaknesses of the technique for various applications are discussed. It is intended to serve as a reference guide for personnel performing project planning and control functions and technical personnel whose responsibilities either include schedule planning and control or require a general knowledge of the subject.

  5. Wildlife mitigation and monitoring report Gunnison, Colorado, site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is administered by the U.S. Department of Energy (DOE); its purpose is to cleanup uranium mill tailings and other contaminated material at 24 UMTRA Project sites in 10 states. This report summarizes the wildlife mitigation and monitoring program under way at the Gunnison UMTRA Project, Gunnison, Colorado. Remedial action at the Gunnison site was completed in December 1995 and is described in detail in the Gunnison completion report. The impacts of this activity were analyzed in the Gunnison environmental assessment (EA). These impacts included two important game species: the pronghorn antelope (Antilocapramore » americans) and sage grouse (Wentrocerus urophasianus). Haul truck traffic was predicted to limit antelope access to water sources north of the Tenderfoot Mountain haul road and that truck traffic along this and other haul roads could result in antelope road kills. Clearing land at the disposal cell, haul road and borrow site activities, and the associated human activities also were predicted to negatively impact (directly and indirectly) sage grouse breeding, nesting, loafing, and wintering habitat. As a result, an extensive mitigation and monitoring plan began in 1992. Most of the monitoring studies are complete and the results of these studies, written by different authors, appear in numerous reports. This report will: (1) Analyze existing impacts and compare them to predicted impacts. (2) Summarize mitigation measures. (3) Summarize all existing monitoring data in one report. (4) Analyze the effectiveness of the mitigation measures.« less

  6. An assessment of the government liquid hydrogen requirements for the 1995-2005 time frame

    NASA Technical Reports Server (NTRS)

    Bain, Addison

    1990-01-01

    The results of government study of long range liquid hydrogen (LH2) requirements for the time period of 1995 through the year 2005 are presented. To assure an adequate supply of LH2 is available in support of various programs, it is imperative a long range projection of LH2 requirements be developed and maintained. This information is vital in planning for necessary procurement actions and assuring adequate industry lead time to acquiring the necessary production and distribution capabilities. The Advanced Launch System and High-Altitude Long-Endurance programs may represent the predominant government needs for LH2 in the long range. The assembled data clearly indicates a need for KSC (Kennedy Space Center) constant program/project surveillance. Also clear is the need for KSC to monitor industry's plans for LH2 plant production and distribution expansion.

  7. Geolocation Support for Water Supply and Sewerage Projects in Azerbaijan

    NASA Astrophysics Data System (ADS)

    Qocamanov, M. H.; Gurbanov, Ch. Z.

    2016-10-01

    Drinking water supply and sewerage system designing and reconstruction projects are being extensively conducted in Azerbaijan Republic. During implementation of such projects, collecting large amount of information about the area and detailed investigations are crucial. Joint use of the aerospace monitoring and GIS play an essential role for the studies of the impact of environmental factors, development of the analytical information systems and others, while achieving the reliable performance of the existing and designed major water supply pipelines, as well as construction and exploitation of the technical installations. With our participation the GIS has been created in "Azersu" OJSC that includes systematic database of the drinking water supply and sewerage system, and rain water networks to carry out necessary geo information analysis. GIScreated based on "Microstation" platform and aerospace data. Should be mentioned that, in the country, specifically in large cities (i.e. Baku, Ganja, Sumqait, etc.,) drinking water supply pipelines cross regions with different physico-geographical conditions, geo-morphological compositions and seismotectonics.Mains water supply lines in many accidents occur during the operation, it also creates problems with drinking water consumers. In some cases the damage is caused by large-scale accidents. Long-term experience gives reason to say that the elimination of the consequences of accidents is a major cost. Therefore, to avoid such events and to prevent their exploitation and geodetic monitoring system to improve the rules on key issues. Therefore, constant control of the plan-height positioning, geodetic measurements for the detailed examination of the dynamics, repetition of the geodetic measurements for certain time intervals, or in other words regular monitoring is very important. During geodetic monitoring using the GIS has special significance. Given that, collecting geodetic monitoring measurements of the main pipelines on the same coordinate system and processing these data on a single GIS system allows the implementation of overall assessment of plan-height state of major water supply pipeline network facilities and the study of the impact of water supply network on environment and alternatively, the impact of natural processes on major pipeline.

  8. Project Plan: Salt in Situ Heater Test.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuhlman, Kristopher L.; Mills, Melissa Marie; Herrick, Courtney G.

    This project plan gives a high-level description of the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Disposition (SFWD) campaign in situ borehole heater test project being planned for the Waste Isolation Pilot Plant (WIPP) site This plan provides an overview of the schedule and responsibilities of the parties involved. This project is a collaborative effort by Sandia, Los Alamos, and Lawrence Berkeley National Laboratories to execute a series of small-diameter borehole heater tests in salt for the DOE-NE SFWD campaign. Design of a heater test in salt at WIPP has evolved over several years.more » The current design was completed in fiscal year 2017 (FY17), an equipment shakedown experiment is underway in April FY18, and the test implementation will begin in summer of FY18. The project comprises a suite of modular tests, which consist of a group of nearby boreholes in the wall of drifts at WIPP. Each test is centered around a packer-isolated heated borehole (5" diameter) containing equipment for water-vapor collection and brine sampling, surrounded by smaller-diameter (2" diameter) satellite observation boreholes. Observation boreholes will contain temperature sensors, tracer release points, electrical resistivity tomography (ERT) sensors, fiber optic sensing, and acoustic emission (AE) measurements, and sonic velocity sources and sensors. These satellite boreholes will also be used for plugging/sealing tests. The first two tests to be implemented will have the packer-isolated borehole heated to 120°C, with one observation borehole used to monitor changes. Follow-on tests will be designed using information gathered from the first two tests, will be conducted at other temperatures, will use multiple observation boreholes, and may include other measurement types and test designs.« less

  9. An adaptive environmental effects monitoring framework for assessing the influences of liquid effluents on benthos, water and sediments in aquatic receiving environments.

    PubMed

    Somers, Keith M; Kilgour, Bruce W; Munkittrick, Kelly R; Arciszewski, Tim J

    2018-05-16

    Environmental effects monitoring (EEM) has been traditionally used to evaluate the effects of existing facilities discharging liquid effluents into natural receiving waters in Canada. EEM also has the potential to provide feedback to an ongoing project in an adaptive management context, and can inform the design of future projects. EEM, consequently, can and should also be used to test the predictions of effects related to new projects. Despite EEM's potential for widespread applicability, challenges related to the effective implementation of EEM include the use of appropriate study designs, as well as to the adoption of tiers for increasing or decreasing monitoring intensity. Herein we describe a template for designing and implementing a six-tiered EEM program that utilizes information from the project-planning and pre-development baseline data collection stages to build on forecasts from the initial environmental impact assessment project-design stage, and feeds into an adaptive management process. Movement between the six EEM tiers is based on the exceedance of Baseline Monitoring Triggers, Forecast Triggers and Management Triggers at various stages in the EEM process. To distinguish these types of triggers, we review the historical development of numeric and narrative triggers as applied to chemical (water and sediment) and biological (plankton, benthos, fish) endpoints. We also provide an overview of historical study design issues and discuss how the six EEM tiers and associated triggers influence the temporal-spatial experimental design options and how the information gained through EEM could be used in an adaptive management context. This article is protected by copyright. All rights reserved. This article is protected by copyright. All rights reserved.

  10. Understanding and improving mitigation strategies for reducing catchment scale nutrient loads using high resolution observations and uncertainty analysis approaches

    NASA Astrophysics Data System (ADS)

    Collins, A.; Lloyd, C.; Freer, J. E.; Johnes, P.; Stirling, M.

    2012-12-01

    One of the biggest challenges in catchment water quality management is tackling the problem of reducing water pollution from agriculture whilst ensuring food security nationally. Improvements to catchment management plans are needed if we are to enhance biodiversity and maintain good ecological status in freshwater ecosystems, while producing enough food to support a growing global population. In order to plan for a more sustainable and secure future, research needs to quantify the uncertainties and understand the complexities in the source-mobilisation-delivery-impact continuum of pollution and nutrients at all scales. In the UK the Demonstration Test Catchment (DTC) project has been set up to improve water quality specifically from diffuse pollution from agriculture by enhanced high resolution monitoring and targeted mitigation experiments. The DTC project aims to detect shifts in the baseline trend of the most ecologically-significant pollutants resulting from targeted on-farm measures at field to farm scales and assessing their effects on ecosystem function. The DTC programme involves three catchments across the UK that are indicative of three different typologies and land uses. This paper will focus on the Hampshire Avon DTC, where a total of 12 parameters are monitored by bank-side stations at two sampling sites, including flow, turbidity, phosphate and nitrate concentrations at 30 min resolution. This monitoring is supported by daily resolution sampling at 5 other sites and storm sampling at all locations. Part of the DTC project aims to understand how observations of water quality within river systems at different temporal resolutions and types of monitoring strategies enable us to understand and detect changes over and above the natural variability. Baseline monitoring is currently underway and early results show that high-resolution data is essential at this sub-catchment scale to understand important process dynamics. This is critical if we are to design cost efficient and effective management strategies. The high-resolution dataset means that there are new opportunities to explore the associated uncertainties in monitoring water quality and assessing ecological status and how that relates to current monitoring networks. For example, concurrent grab samples at the high-resolution sampling stations allow the assessment of the uncertainties which would be generated through coarser sampling strategies. This is just the beginning of the project, however, as the project progresses, the high resolution dataset will provide higher statistical power compared with previous data collection schemes and allow the employment of more complex methods such as signal decomposition e.g. wavelet analysis, which can allow us to start to decipher the complex interactions occurring at sub-catchment scale which may not be immediately detectable in bulk signals. In this paper we outline our methodological approach, present some of the initial findings of this research and how we can quantify changes to nutrient loads whilst taking account the main uncertainties and the inherent natural variability.

  11. A proposal for continuation of support for the application of remotely sensed data to state and regional problems. Part 1: Technical proposal

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The objectives, procedures, accomplishments, plans, and ultimate uses of information from current projects at the Mississippi Remote Sensing Center are discussed for the following applications: (1) land use planning; (2) strip mine inventory and reclamation; (3) biological management for white tailed deer; (4) forest habitats in potential lignite areas; (5) change discrimination in gravel operations; (6) discrimination of freshwater wetlands for inventory and monitoring; and (7) remote sensing data analysis support systems. The initiation of a conceptual design for a LANDSAT based, state wide information system is proposed.

  12. 40 CFR 63.1187 - What do I need to know about operations, maintenance, and monitoring plans?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations, maintenance, and monitoring plans? 63.1187 Section 63.1187 Protection of Environment... about operations, maintenance, and monitoring plans? (a) An operations, maintenance, and monitoring plan... title V permit. (b) The operations, maintenance, and monitoring plan must include the following: (1...

  13. Useful Life Prediction for Payload Carrier Hardware

    NASA Technical Reports Server (NTRS)

    Ben-Arieh, David

    2002-01-01

    The Space Shuttle has been identified for use through 2020. Payload carrier systems will be needed to support missions through the same time frame. To support the future decision making process with reliable systems, it is necessary to analyze design integrity, identify possible sources of undesirable risk and recognize required upgrades for carrier systems. This project analyzed the information available regarding the carriers and developed the probability of becoming obsolete under different scenarios. In addition, this project resulted in a plan for an improved information system that will improve monitoring and control of the various carriers. The information collected throughout this project is presented in this report as process flow, historical records, and statistical analysis.

  14. Science Base and Tools for Evaluating Stream Restoration Project Proposals.

    NASA Astrophysics Data System (ADS)

    Cluer, B.; Thorne, C.; Skidmore, P.; Castro, J.; Pess, G.; Beechie, T.; Shea, C.

    2008-12-01

    Stream restoration, stabilization, or enhancement projects typically employ site-specific designs and site- scale habitat improvement projects have become the default solution to many habitat problems and constraints. Such projects are often planned and implemented without thorough consideration of the broader scale problems that may be contributing to habitat degradation, attention to project resiliency to flood events, accounting for possible changes in climate or watershed land use, or ensuring the long term sustainability of the project. To address these issues, NOAA Fisheries and USFWS have collaboratively commissioned research to develop a science document and accompanying tools to support more consistent and comprehensive review of stream management and restoration projects proposals by Service staff responsible for permitting. The science document synthesizes the body of knowledge in fluvial geomorphology and presents it in a way that is accessible to the Services staff biologists, who are not trained experts in this field. Accompanying the science document are two electronic tools: a Project Information Checklist to assist in evaluating whether a proposal includes all the information necessary to allow critical and thorough project evaluation; and a Project Evaluation Tool (in flow chart format) that guides reviewers through the steps necessary to critically evaluate the quality of the information submitted, the goals and objectives of the project, project planning and development, project design, geomorphic-habitat-species relevance, and risks to listed species. Materials for training Services staff and others in the efficient use of the science document and tools have also been developed. The longer term goals of this effort include: enabling consistent and comprehensive reviews that are completed in a timely fashion by regulators; facilitating improved project planning and design by proponents; encouraging projects that are attuned to their watershed and geomorphic contexts; questioning perceived constraints on project design; reducing the use of hard structures and encouraging deformability; promoting designs that address both risk and uncertainty in applying engineering design standards; allowing for future climate and land use changes; and encouraging post-project monitoring, appraisal and project aftercare.

  15. Using Spring Water Nitrate to Monitor Spatiotemporal Trends in Nitrogen Deposition for the Santa Clara Valley Habitat Plan

    NASA Astrophysics Data System (ADS)

    Weiss, S. B.; Hastings, M. G.

    2016-12-01

    Atmospheric nitrogen deposition is a major acute threat to biodiversity, but has rarely been addressed in regulatory conservation plans. The Santa Clara Valley Habitat Plan is a Habitat Conservation Plan/Natural Communities Conservation Plan (HCP/NCCP) that addresses development impacts on 19 covered species, most of which inhabit nutrient-poor serpentine grasslands that are highly sensitive to N-deposition with a critical load of 6 kg-N ha-1 year-1. Increased N-deposition from highway improvements and development was a major regulatory nexus, and a novel nitrogen fee based on car trips generated is one of the funding mechanisms, driving a need for cost-effective and robust monitoring of N-deposition trends over the 50-year plan and beyond. In the high deposition zone (10-20 kg-N ha-1 year-1), spring water nitrate levels up to 25 ppm (as NO3-) were measured in baseflow, levels higher than any reported for non-agricultural sites in California. Nitrate measurements follow measured and modeled deposition gradients, and are affected by catchment soils, geomorphology, and vegetation. Existing knowledge of local nitrogen deposition using passive samplers, CMAQ models, N-cycling measurements, and emissions inventories/projections are used to generate hypotheses that can be tested with a combination of spring water nitrate sampled through the year and across deposition gradients, N and O isotopic analysis including 17O to trace atmospheric nitrate, modeled recharge rates, and groundwater dating. A set of sentinel springs for long-term monitoring will be identified and sampled on an interval commensurate with shallow groundwater residence times. The unique characteristics of serpentine grasslands (low productivity, shallow soils, highly fractured bedrock, and numerous springs) provide a model system for tracing N-deposition and its effects on protected species.

  16. Environmental monitoring techniques and wave energy potential assessment: an integrated approach for planning marine energy conversion schemes in the northern Tyrrhenian sea, Italy

    NASA Astrophysics Data System (ADS)

    Scanu, Sergio; Peviani, Maximo; Carli, Filippo Maria; Paladini de Mendoza, Francesco; Piermattei, Viviana; Bonamano, Simone; Marcelli, Marco

    2015-04-01

    This work proposes a multidisciplinary approach in which wave power potential maps are used as baseline for the application of environmental monitoring techniques identified through the use of a Database for Environmental Monitoring Techniques and Equipment (DEMTE), derived in the frame of the project "Marine Renewables Infrastructure Network for Emerging Energy Technologies" (Marinet - FP7). This approach aims to standardize the monitoring of the marine environment in the event of installation, operation and decommissioning of Marine Energy Conversion Systems. The database has been obtained through the collection of techniques and instrumentation available among the partners of the consortium, in relation with all environmental marine compounds potentially affected by any impacts. Furthermore in order to plan marine energy conversion schemes, the wave potential was assessed at regional and local scales using the numerical modelling downscaling methodology. The regional scale lead to the elaboration of the Italian Wave Power Atlas, while the local scale lead to the definition of nearshore hot spots useful for the planning of devices installation along the Latium coast. The present work focus in the application of environmental monitoring techniques identified in the DEMTE, in correspondence of the hotspot derived from the wave potential maps with particular reference to the biological interaction of the devices and the management of the marine space. The obtained results are the bases for the development of standardized procedures which aims to an effective application of marine environmental monitoring techniques during the installation, operation and decommissioning of Marine Energy Conversion Systems. The present work gives a consistent contribution to overcome non-technological barriers in the concession procedures, as far as the protection of the marine environment is of concern.

  17. Comprehensive Lifecycle Planning and Management System For Addressing Water Issues Associated With Shale Gas Development In New York, Pennsylvania, And West Virginia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arthur, J. Daniel

    2012-07-01

    The objective of this project is to develop a modeling system to allow operators and regulators to plan all aspects of water management activities associated with shale gas development in the target project area of New York, Pennsylvania, and West Virginia (target area ), including water supply, transport, storage, use, recycling, and disposal and which can be used for planning, managing, forecasting, permit tracking, and compliance monitoring. The proposed project is a breakthrough approach to represent the entire shale gas water lifecycle in one comprehensive system with the capability to analyze impacts and options for operational efficiency and regulatory trackingmore » and compliance, and to plan for future water use and disposition. It will address all of the major water-related issues of concern associated with shale gas development in the target area, including water withdrawal, transport, storage, use, treatment, recycling, and disposal. It will analyze the costs, water use, and wastes associated with the available options, and incorporate constraints presented by permit requirements, agreements, local and state regulations, equipment and material availability, etc. By using the system to examine the water lifecycle from withdrawals through disposal, users will be able to perform scenario analysis to answer "what if" questions for various situations. The system will include regulatory requirements of the appropriate state and regional agencies and facilitate reporting and permit applications and tracking. These features will allow operators to plan for more cost effective resource production. Regulators will be able to analyze impacts of development over an entire area. Regulators can then make informed decisions about the protections and practices that should be required as development proceeds. This modeling system will have myriad benefits for industry, government, and the public. For industry, it will allow planning all water management operations for a project or an area as one entity to optimize water use and minimize costs subject to regulatory and other constraints. It will facilitate analysis of options and tradeoffs, and will also simplify permitting and reporting to regulatory agencies. The system will help regulators study cumulative impacts of development, conserve water resources, and manage disposal options across a region. It will also allow them to track permits and monitor compliance. The public will benefit from water conservation, improved environmental performance as better system wide decisions are made, and greater supply of natural gas, with attendant lower prices, as costs are reduced and development is assisted through better planning and scheduling. Altogether, better economics and fewer barriers will facilitate recovery of the more than 300 trillion cubic feet of estimated recoverable natural gas resource in the Marcellus Shale in a manner that protects the environment.« less

  18. Planning Skills and Negotiator Goal Accomplishment: The Relationship between Self-Monitoring and Plan Generation, Plan Enactment, and Plan Consequences.

    ERIC Educational Resources Information Center

    Jordan, Jerry Monroe; Roloff, Michael E.

    1997-01-01

    Focuses on skills necessary for effective negotiation planning. Argues that the information processing tendencies of high self-monitors make them adept at negotiation planning. Extends existing work by relating self-monitoring to plan generation, enactment, and consequences. Indicates that self-monitoring is related to prenegotiation goal…

  19. SERDP Ecosystem Management Project (SEMP): 2004 Technical Report

    DTIC Science & Technology

    2006-06-01

    sustainability and native biological diversity of terrestrial and aquatic, including marine , ecosystems while supporting hu- man needs, including the DoD mission...of DOD lands, 2. contribute baseline level biotic and abiotic data to the integrated monitoring plan of the host site, 3. establish a long-term...been several lessons learned concerning hardware selection, installation, and implemen- tation as well as equipment performance. All of the abiotic

  20. An Engineering Report in Civil Engineering and Management.

    DTIC Science & Technology

    1987-12-01

    programs as the Apollo program and the Canaveral program. Progress in the late 70s and the 80s has seen advancements in the application of sophisticated...other forces in military operations; subsequent combat service support ashore and defense against overt or clandestine enemy attacks directed toward...construction execution plans; assigns construction projects to NCF units; monitors progress and assures adherence to quality standards: directs

  1. Manned spacecraft automation and robotics

    NASA Technical Reports Server (NTRS)

    Erickson, Jon D.

    1987-01-01

    The Space Station holds promise of being a showcase user and driver of advanced automation and robotics technology. The author addresses the advances in automation and robotics from the Space Shuttle - with its high-reliability redundancy management and fault tolerance design and its remote manipulator system - to the projected knowledge-based systems for monitoring, control, fault diagnosis, planning, and scheduling, and the telerobotic systems of the future Space Station.

  2. Analysis of Local Planning Interviews.

    DTIC Science & Technology

    1984-04-01

    Suite 121, P.O. Box 2487 Project No. 4813-D Kirkland, WA 98033 II. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE Federal Emergency Management...Agency April 1984 Washington, D.C. 20472 13. NUMBER OF PAGES31 14. MONITORING AGENCY NAME & ADDRESS(If different from Controlling Office) IS. SECURITY...and Control and the basic emergency functions (Warning, RADEF, Law Enforcement, Fire, Communications, Public Information, Health, Medical, Evacuation

  3. The application of micro UAV in construction project

    NASA Astrophysics Data System (ADS)

    Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura

    2017-10-01

    In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.

  4. Description of Existing Data for Integrated Landscape Monitoring in the Puget Sound Basin, Washington

    USGS Publications Warehouse

    Aiello, Danielle P.; Torregrosa, Alicia; Jason, Allyson L.; Fuentes, Tracy L.; Josberger, Edward G.

    2008-01-01

    This report summarizes existing geospatial data and monitoring programs for the Puget Sound Basin in northwestern Washington. This information was assembled as a preliminary data-development task for the U.S. Geological Survey (USGS) Puget Sound Integrated Landscape Monitoring (PSILM) pilot project. The PSILM project seeks to support natural resource decision-making by developing a 'whole system' approach that links ecological processes at the landscape level to the local level (Benjamin and others, 2008). Part of this effort will include building the capacity to provide cumulative information about impacts that cross jurisdictional and regulatory boundaries, such as cumulative effects of land-cover change and shoreline modification, or region-wide responses to climate change. The PSILM project study area is defined as the 23 HUC-8 (hydrologic unit code) catchments that comprise the watersheds that drain into Puget Sound and their near-shore environments. The study area includes 13 counties and more than four million people. One goal of the PSILM geospatial database is to integrate spatial data collected at multiple scales across the Puget Sound Basin marine and terrestrial landscape. The PSILM work plan specifies an iterative process that alternates between tasks associated with data development and tasks associated with research or strategy development. For example, an initial work-plan goal was to delineate the study area boundary. Geospatial data required to address this task included data from ecological regions, watersheds, jurisdictions, and other boundaries. This assemblage of data provided the basis for identifying larger research issues and delineating the study-area boundary based on these research needs. Once the study-area boundary was agreed upon, the next iteration between data development and research activities was guided by questions about data availability, data extent, data abundance, and data types. This report is not intended as an exhaustive compilation of all available geospatial data, rather, it is a collection of information about geospatial data that can be used to help answer the suite of questions posed after the study-area boundary was defined. This information will also be useful to the PSILM team for future project tasks, such as assessing monitoring gaps, exploring monitoring-design strategies, identifying and deriving landscape indicators and metrics, and visual geographic communication. The two main geospatial data types referenced in this report - base-reference layers and monitoring data - originated from numerous and varied sources. In addition to collecting information and metadata about the base-reference layers, the data also were collected for project needs, such as developing maps for visual communication among team members and with outside groups. In contrast, only information about the data was typically required for the monitoring data. The information on base-reference layers and monitoring data included in this report is only as detailed as what was readily available from the sources themselves. Although this report may appear to lack consistency between data records, the varying degree of details contained in this report are merely a reflection of varying source detail. This compilation is just a beginning. All data listed also are being catalogued in spreadsheets and knowledge-management systems. Our efforts are continual as we develop a geospatial catalog for the PSILM pilot project.

  5. Guidelines for the collection of continuous stream water-temperature data in Alaska

    USGS Publications Warehouse

    Toohey, Ryan C.; Neal, Edward G.; Solin, Gary L.

    2014-01-01

    Objectives of stream monitoring programs differ considerably among many of the academic, Federal, state, tribal, and non-profit organizations in the state of Alaska. Broad inclusion of stream-temperature monitoring can provide an opportunity for collaboration in the development of a statewide stream-temperature database. Statewide and regional coordination could reduce overall monitoring cost, while providing better analyses at multiple spatial and temporal scales to improve resource decision-making. Increased adoption of standardized protocols and data-quality standards may allow for validation of historical modeling efforts with better projection calibration. For records of stream water temperature to be generally consistent, unbiased, and reproducible, data must be collected and analyzed according to documented protocols. Collection of water-temperature data requires definition of data-quality objectives, good site selection, proper selection of instrumentation, proper installation of sensors, periodic site visits to maintain sensors and download data, pre- and post-deployment verification against an NIST-certified thermometer, potential data corrections, and proper documentation, review, and approval. A study created to develop a quality-assurance project plan, data-quality objectives, and a database management plan that includes procedures for data archiving and dissemination could provide a means to standardize a statewide stream-temperature database in Alaska. Protocols can be modified depending on desired accuracy or specific needs of data collected. This document is intended to guide users in collecting time series water-temperature data in Alaskan streams and draws extensively on the broader protocols already published by the U.S. Geological Survey.

  6. Sequence-of-events-driven automation of the deep space network

    NASA Technical Reports Server (NTRS)

    Hill, R., Jr.; Fayyad, K.; Smyth, C.; Santos, T.; Chen, R.; Chien, S.; Bevan, R.

    1996-01-01

    In February 1995, sequence-of-events (SOE)-driven automation technology was demonstrated for a Voyager telemetry downlink track at DSS 13. This demonstration entailed automated generation of an operations procedure (in the form of a temporal dependency network) from project SOE information using artificial intelligence planning technology and automated execution of the temporal dependency network using the link monitor and control operator assistant system. This article describes the overall approach to SOE-driven automation that was demonstrated, identifies gaps in SOE definitions and project profiles that hamper automation, and provides detailed measurements of the knowledge engineering effort required for automation.

  7. Research Implementation and Quality Assurance Project Plan: An Evaluation of Hyperspectral Remote Sensing Technologies for the Detection of Fugitive Contamination at Selected Superfund Hazardous Waste Sites

    USGS Publications Warehouse

    Slonecker, E. Terrence; Fisher, Gary B.

    2009-01-01

    This project is a research collaboration between the U.S. Environmental Protection Agency (EPA) Office of Inspector General (OIG) and the U.S. Geological Survey (USGS) Eastern Geographic Science Center (EGSC), for the purpose of evaluating the utility of hyperspectral remote sensing technology for post-closure monitoring of residual contamination at delisted and closed hazardous waste sites as defined under the Comprehensive Environmental Response Compensation and Liability Act [CERCLA (also known as 'Superfund')] of 1980 and the Superfund Amendments and Reauthorization Act (SARA) of 1986.

  8. Sequence-of-Events-Driven Automation of the Deep Space Network

    NASA Technical Reports Server (NTRS)

    Hill, R., Jr.; Fayyad, K.; Smyth, C.; Santos, T.; Chen, R.; Chien, S.; Bevan, R.

    1996-01-01

    In February 1995, sequence-of-events (SOE)-driven automation technology was demonstrated for a Voyager telemetry downlink track at DSS 13. This demonstration entailed automated generation of an operations procedure (in the form of a temporal dependency network) from project SOE information using artificial intelligence planning technology and automated execution of the temporal dependency network using the link monitor and control operator assistant system. This article describes the overall approach to SOE-driven automation that was demonstrated, identifies gaps in SOE definitions and project profiles that hamper automation, and provides detailed measurements of the knowledge engineering effort required for automation.

  9. What is the Value Added to Adaptation Planning by Probabilistic Projections of Climate Change?

    NASA Astrophysics Data System (ADS)

    Wilby, R. L.

    2008-12-01

    Probabilistic projections of climate change offer new sources of risk information to support regional impacts assessment and adaptation options appraisal. However, questions continue to surround how best to apply these scenarios in a practical context, and whether the added complexity and computational burden leads to more robust decision-making. This paper provides an overview of recent efforts in the UK to 'bench-test' frameworks for employing probabilistic projections ahead of the release of the next generation, UKCIP08 projections (in November 2008). This is involving close collaboration between government agencies, research and stakeholder communities. Three examples will be cited to illustrate how probabilistic projections are already informing decisions about future flood risk management in London, water resource planning in trial river basins, and assessments of risks from rising water temperatures to Atlantic salmon stocks in southern England. When compared with conventional deterministic scenarios, ensemble projections allow exploration of a wider range of management options and highlight timescales for implementing adaptation measures. Users of probabilistic scenarios must keep in mind that other uncertainties (e.g., due to impacts model structure and parameterisation) should be handled in an equally rigorous way to those arising from climate models and emission scenarios. Finally, it is noted that a commitment to long-term monitoring is also critical for tracking environmental change, testing model projections, and for evaluating the success (or not) of any scenario-led interventions.

  10. Hawaii energy strategy project 3: Renewable energy resource assessment and development program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    RLA Consulting (RLA) has been retained by the State of Hawaii Department of Business, Economic Development and Tourism (DBEDT) to conduct a Renewable Energy Resource Assessment and Development Program. This three-phase program is part of the Hawaii Energy Strategy (HES), which is a multi-faceted program intended to produce an integrated energy strategy for the State of Hawaii. The purpose of Phase 1 of the project, Development of a Renewable Energy Resource Assessment Plan, is to better define the most promising potential renewable energy projects and to establish the most suitable locations for project development in the state. In order tomore » accomplish this goal, RLA has identified constraints and requirements for renewable energy projects from six different renewable energy resources: wind, solar, biomass, hydro, wave, and ocean thermal. These criteria were applied to areas with sufficient resource for commercial development and the results of Phase 1 are lists of projects with the most promising development potential for each of the technologies under consideration. Consideration of geothermal energy was added to this investigation under a separate contract with DBEDT. In addition to the project lists, a monitoring plan was developed with recommended locations and a data collection methodology for obtaining additional wind and solar data. This report summarizes the results of Phase 1. 11 figs., 22 tabs.« less

  11. TH-AB-202-09: Direct-Aperture Optimization for Combined MV+kV Dose Planning in Fluoroscopic Real-Time Tumor-Tracking Radiation Therapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liu, X; Belcher, AH; Grelewicz, Z

    Purpose: Real-time kV fluoroscopic tumor tracking has the benefit of direct tumor position monitoring. However, there is clinical concern over the excess kV imaging dose cost to the patient when imaging in continuous fluoroscopic mode. This work addresses this specific issue by proposing a combined MV+kV direct-aperture optimization (DAO) approach to integrate the kV imaging beam into a treatment planning such that the kV radiation is considered as a contributor to the overall dose delivery. Methods: The combined MV+kV DAO approach includes three algorithms. First, a projected Quasi-Newton algorithm (L-BFGS) is used to find optimized fluence with MV+kV dose formore » the best possible dose distribution. Then, Engel’s algorithm is applied to optimize the total number of monitor units and heuristically optimize the number of apertures. Finally, an aperture shape optimization (ASO) algorithm is applied to locally optimize the leaf positions of MLC. Results: Compared to conventional DAO MV plans with continuous kV fluoroscopic tracking, combined MV+kV DAO plan leads to a reduction in the total number of MV monitor units due to inclusion of kV dose as part of the PTV, and was also found to reduce the mean and maximum doses on the organs at risk (OAR). Compared to conventional DAO MV plan without kV tracking, the OAR dose in the combined MV+kV DAO plan was only slightly higher. DVH curves show that combined MV+kV DAO plan provided about the same PTV coverage as that in the conventional DAO plans without kV imaging. Conclusion: We report a combined MV+kV DAO approach that allows real time kV imager tumor tracking with only a trivial increasing on the OAR doses while providing the same coverage to PTV. The approach is suitable for clinic implementation.« less

  12. Building Ecological and Community Resilience and Measuring Success of the Department of Interior Hurricane Sandy Resilience Projects

    NASA Astrophysics Data System (ADS)

    Taylor, S. M.; Worman, S. L.; Bennett, R.; Bassow, A.

    2017-12-01

    The Department of the Interior (DOI) partnered with the National Fish and Wildlife Foundation (NFWF) to administer an external funding competition to support coastal resilience projects in the region affected by Hurricane Sandy. The projects complement the DOI Bureau-led projects, but are led by state and local governments, universities, non-profits, community groups, tribes, and other non-Federal entities. In total, the Hurricane Sandy Resilience Program invested over $750 million in approximately 180 projects to repair damage and improve the resilience of habitats, communities and infrastructure to future storms and sea level rise. Project activities include waterway connection and opening, living shoreline, marsh restoration, community resilience planning, data/mapping/modeling, and beach and dune restoration. DOI and NFWF initiated a resilience assessment in 2015 to evaluate the impact of this investment. The assessment began by clarifying the program's resilience goals and the development of ecological and socio-economic metrics across the project activities. Using these metrics, the evaluation is assessing the ecological and community outcomes, cost effectiveness of activities, improved scientific understanding, and temporal and spatial scaling of benefits across resilience activities. Recognizing the unique opportunity afforded by the scale and distribution of projects, NFWF and DOI have invested in monitoring through 2024 to better understand how these projects perform over time. This presentation will describe the evaluation questions, approach, long-term monitoring, online metrics portal, and findings to date.

  13. The integrated project: a promising promotional strategy for primary health care.

    PubMed

    Daniel, C; Mora, B

    1985-10-01

    The integrated project using parasite control and nutrition as entry points for family planning practice has shown considerable success in promoting health consciousness among health workers and project beneficiaries. This progress is evident in the Family Planning, Parasite Control and Nutrition (FAPPCAN) areas. The project has also mobilized technical and financial support from the local government as well as from private and civic organizations. The need for integration is underscored by the following considerations: parasite control has proved to be effective for preventive health care; the integrated project uses indigenous community health workers to accomplish its objectives; the primary health care (PHC) movement depends primarily on voluntary community participation and the integrated project has shown that it can elicit this participation. The major health problems in the Philippines are: a prevalence of communicable and other infectious diseases; poor evironmental sanitation; malnutrition; and a rapid population growth rate. The integrated program utilizes the existing village health workers in identifying problems related to family planning, parasite control and nutrition and integrates these activities into the health delivery system; educates family members on how to detect health and health-related problems; works out linkages with government agencies and the local primary health care committee in defining the scope of health-related problems; mobilizes community members to initiate their own projects; gets the commitment of village officials and committe members. The integrated project operates within the PHC. A health van with a built-in video playback system provides educational and logistical support to the village worker. The primary detection and treatment of health problems are part of the village health workers' responsibilities. Research determines the project's capability to reactivate the village primary health care committees and sustain community commitment. The project initially covered 4 villages. Implementation problems included: inactive village health workers, inadequate supervision and monitoring of PHC, a lack of commitment of committee members, and the lack of financial support.

  14. Nuclear Explosion Monitoring History and Research and Development

    NASA Astrophysics Data System (ADS)

    Hawkins, W. L.; Zucca, J. J.

    2008-12-01

    Within a year after the nuclear detonations over Hiroshima and Nagasaki the Baruch Plan was presented to the newly formed United Nations Atomic Energy Commission (June 14, 1946) to establish nuclear disarmament and international control over all nuclear activities. These controls would allow only the peaceful use of atomic energy. The plan was rejected through a Security Council veto primarily because of the resistance to unlimited inspections. Since that time there have been many multilateral, and bilateral agreements, and unilateral declarations to limit or eliminate nuclear detonations. Almost all of theses agreements (i.e. treaties) call for some type of monitoring. We will review a timeline showing the history of nuclear testing and the more important treaties. We will also describe testing operations, containment, phenomenology, and observations. The Comprehensive Nuclear Test Ban Treaty (CTBT) which has been signed by 179 countries (ratified by 144) established the International Monitoring System global verification regime which employs seismic, infrasound, hydroacoustic and radionuclide monitoring techniques. The CTBT also includes on-site inspection to clarify whether a nuclear explosion has been carried out in violation of the Treaty. The US Department of Energy (DOE) through its National Nuclear Security Agency's Ground-Based Nuclear Explosion Monitoring R&D Program supports research by US National Laboratories, and universities and industry internationally to detect, locate, and identify nuclear detonations. This research program builds on the broad base of monitoring expertise developed over several decades. Annually the DOE and the US Department of Defense jointly solicit monitoring research proposals. Areas of research include: seismic regional characterization and wave propagation, seismic event detection and location, seismic identification and source characterization, hydroacoustic monitoring, radionuclide monitoring, infrasound monitoring, and data processing and analysis. Reports from the selected research projects are published in the proceedings of the annual Monitoring Research Review conference.

  15. Adaptive social impact management for conservation and environmental management.

    PubMed

    Kaplan-Hallam, Maery; Bennett, Nathan J

    2018-04-01

    Concerns about the social consequences of conservation have spurred increased attention the monitoring and evaluation of the social impacts of conservation projects. This has resulted in a growing body of research that demonstrates how conservation can produce both positive and negative social, economic, cultural, health, and governance consequences for local communities. Yet, the results of social monitoring efforts are seldom applied to adaptively manage conservation projects. Greater attention is needed to incorporating the results of social impact assessments in long-term conservation management to minimize negative social consequences and maximize social benefits. We bring together insights from social impact assessment, adaptive management, social learning, knowledge coproduction, cross-scale governance, and environmental planning to propose a definition and framework for adaptive social impact management (ASIM). We define ASIM as the cyclical process of monitoring and adaptively managing social impacts over the life-span of an initiative through the 4 stages of profiling, learning, planning, and implementing. We outline 14 steps associated with the 4 stages of the ASIM cycle and provide guidance and potential methods for social-indicator development, predictive assessments of social impacts, monitoring and evaluation, communication of results, and identification and prioritization of management responses. Successful ASIM will be aided by engaging with best practices - including local engagement and collaboration in the process, transparent communication of results to stakeholders, collective deliberation on and choice of interventions, documentation of shared learning at the site level, and the scaling up of insights to inform higher-level conservation policies-to increase accountability, trust, and perceived legitimacy among stakeholders. The ASIM process is broadly applicable to conservation, environmental management, and development initiatives at various scales and in different contexts. © 2017 Society for Conservation Biology.

  16. Actionable Science in the Gulf of Mexico: Connecting Researchers and Resource Managers

    NASA Astrophysics Data System (ADS)

    Lartigue, J.; Parker, F.; Allee, R.; Young, C.

    2017-12-01

    The National Oceanic and Atmospheric Administration (NOAA) RESTORE Science Program was established in the wake of the Deepwater Horizon oil spill to to carry out research, observation, and monitoring to support the long-term sustainability of the Gulf of Mexico ecosystem, including its fisheries. Administered in partnership with the US Fish and Wildlife Service, the Science Program emphasizes a connection between science and decision-making. This emphasis translated into an engagement process that allowed for resource managers and other users of information about the ecosystem to provide direct input into the science plan for the program. In developing funding opportunities, the Science Program uses structured conversations with resource managers and other decision makers to focus competitions on specific end user needs. When evaluating proposals for funding, the Science Program uses criteria that focus on applicability of a project's findings and products, end user involvement in project planning, and the approach for transferring findings and products to the end user. By including resource managers alongside scientific experts on its review panels, the Science Program ensures that these criteria are assessed from both the researcher and end user perspectives. Once funding decisions are made, the Science Program assigns a technical monitor to each award to assist with identifying and engaging end users. Sharing of best practices among the technical monitors has provided the Science Program insight on how best to bridge the gap between research and resource management and how to build successful scientist-decision maker partnerships. During the presentation, we will share two case studies: 1) design of a cooperative (fisheries scientist, fisheries managers, and fishers), Gulf-wide conservation and monitoring program for fish spawning aggregations and 2) development of habitat-specific ecosystem indicators for use by federal and state resource managers.

  17. Managing Fault Management Development

    NASA Technical Reports Server (NTRS)

    McDougal, John M.

    2010-01-01

    As the complexity of space missions grows, development of Fault Management (FM) capabilities is an increasingly common driver for significant cost overruns late in the development cycle. FM issues and the resulting cost overruns are rarely caused by a lack of technology, but rather by a lack of planning and emphasis by project management. A recent NASA FM Workshop brought together FM practitioners from a broad spectrum of institutions, mission types, and functional roles to identify the drivers underlying FM overruns and recommend solutions. They identified a number of areas in which increased program and project management focus can be used to control FM development cost growth. These include up-front planning for FM as a distinct engineering discipline; managing different, conflicting, and changing institutional goals and risk postures; ensuring the necessary resources for a disciplined, coordinated approach to end-to-end fault management engineering; and monitoring FM coordination across all mission systems.

  18. [Experimental orthopedic surgery: the practical aspects and management].

    PubMed

    Di Denia, P; Caligiuri, G; Guzzardella, G A; Fini, M; Giardino, R

    1996-01-01

    The funds to grant for a scientific research project are more and more interesting public and private administrations. A quantitative analysis of experimental research prices in all its phases is mandatory for an optimization process. The aim of this paper is to define practical and economical aspects of the experimental 'in vivo' models designed for the validation of biomaterials, with particular respect to the managerial bookkeeping of consumer goods, based on the experience of our Institute. Some tables were realized in order to quantify the resources needed to perform experimental 'in vivo' models. These tables represent a reliable tool for a continuous monitoring of managerial costs for the current year and for an accurate budget planning for the future years considering the experimental projects in progress and the planned researches. A business organization of public research facilities may lead to an optimization of costs and an easier national and international funds achievement increasing, also, the partnership with private appointers.

  19. Excerpts from Managing CQI in Radiology and Diagnostic Imaging Services: A CQI Handbook.

    PubMed

    Joseph, E D; Lesher, C; Zage, R

    1994-01-01

    Continuous quality improvement (CQI) is currently the most popular and influential quality management program used in healthcare organizations. It is an effective methodology for identifying and acting on opportunities to improve the efficiency, effectiveness and value of services provided to customers. CQI implementation can be broken down into four components: (1) achievement objectives and goal identification, (2) system process analysis, (3) action planning and implementation, and (4) performance measurement and follow-up. As the project team establishes goals, it should consider customer and staff needs, what constitutes "quality," existing guidelines and regulations, and how results will be measured. Many techniques can be used to analyze the procedure or function targeted for improvement, including charts and diagrams, formal monitoring, data collection and statistical analysis. After the project team has identified potential service improvements, they develop an action plan, which may include education, recruitment, reassignment or equipment acquisition. The team must consider the impact of proposed changes and the financial and logistical feasibility of various proposals. The dynamic challenges of radiology and diagnostic imaging cannot be addressed through single, isolated actions; efforts to improve quality should be continuous. Accordingly, the project team should measure and analyze results of the action plan, reappraise goals and look for opportunities to further improve service.

  20. Newberry Well 55-29 Stimulation Data

    DOE Data Explorer

    Trenton T. Cladouhos

    2012-12-08

    The Newberry Volcano EGS Demonstration in central Oregon, a 3 year project started in 2010, tests recent technological advances designed to reduce the cost of power generated by EGS in a hot, dry well (NWG 55-29) drilled in 2008. First, the stimulation pumps used were designed to run for weeks and deliver large volumes of water at moderate well-head pressure. Second, to stimulate multiple zones, AltaRock developed thermo-degradable zonal isolation materials (TZIMs) to seal off fractures in a geothermal well to stimulate secondary and tertiary fracture zones. The TZIMs degrade within weeks, resulting in an optimized injection/ production profile of the entire well. Third, the project followed a project-specific Induced Seismicity Mitigation Plan (ISMP) to evaluate, monitor for, and mitigate felt induced seismicity. Stimulation started October 17, 2012 and continued for 7 weeks, with over 41,000 m3 of water injected. Two TZIM treatments successfully shifted the depth of stimulation. Injectivity, DTS, and seismic analysis indicate that fracture permeability in well NWG 55-29 was enhanced by two orders of magnitude. This submission includes all of the files and reports associated with the geophysical exploration, stimulation, and monitoring included in the scope of the project.

  1. Soil Management Plan for the Oak Ridge Y-12 National Security Complex Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2005-03-02

    This Soil Management Plan applies to all activities conducted under the auspices of the National Nuclear Security Administration (NNSA) Oak Ridge Y-12 National Security Complex (Y-12) that involve soil disturbance and potential management of waste soil. The plan was prepared under the direction of the Y-12 Environmental Compliance Department of the Environment, Safety, and Health Division. Soil disturbances related to maintenance activities, utility and building construction projects, or demolition projects fall within the purview of the plan. This Soil Management Plan represents an integrated, visually oriented, planning and information resource tool for decision making involving excavation or disturbance of soilmore » at Y-12. This Soil Management Plan addresses three primary elements. (1) Regulatory and programmatic requirements for management of soil based on the location of a soil disturbance project and/or the regulatory classification of any contaminants that may be present (Chap. 2). Five general regulatory or programmatic classifications of soil are recognized to be potentially present at Y-12; soil may fall under one or more these classifications: (a) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) pursuant to the Oak Ridge Reservation (ORR) Federal Facilities Agreement; (b) Resource Conservation and Recovery Act (RCRA); (c) RCRA 3004(u) solid waste managements units pursuant to the RCRA Hazardous and Solid Waste Amendments Act of 1984 permit for the ORR; (d) Toxic Substances and Control Act-regulated soil containing polychlorinated biphenyls; and (e) Radiologically contaminated soil regulated under the Atomic Energy Act review process. (2) Information for project planners on current and future planned remedial actions (RAs), as prescribed by CERCLA decision documents (including the scope of the actions and remedial goals), land use controls implemented to support or maintain RAs, RCRA post-closure regulatory requirements for former waste management units, legacy contamination source areas and distribution of contamination in soils, and environmental infrastructure (e.g., caps, monitoring systems, etc.) that is in place or planned in association with RAs. (3) Regulatory considerations and processes for management and disposition of waste soil upon generation, including regulatory drivers, best management practices (BMPs), waste determination protocols, waste acceptance criteria, and existing waste management procedures and BMPs for Y-12. This Soil Management Plan provides information to project planners to better coordinate their activities with other organizations and programs with a vested interest in soil disturbance activities at Y-12. The information allows project managers and maintenance personnel to evaluate and anticipate potential contaminant levels that may be present at a proposed soil disturbance site prior to commencement of activities and allows a more accurate assessment of potential waste management requirements.« less

  2. SU-E-T-113: Dose Distribution Using Respiratory Signals and Machine Parameters During Treatment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Imae, T; Haga, A; Saotome, N

    Purpose: Volumetric modulated arc therapy (VMAT) is a rotational intensity-modulated radiotherapy (IMRT) technique capable of acquiring projection images during treatment. Treatment plans for lung tumors using stereotactic body radiotherapy (SBRT) are calculated with planning computed tomography (CT) images only exhale phase. Purpose of this study is to evaluate dose distribution by reconstructing from only the data such as respiratory signals and machine parameters acquired during treatment. Methods: Phantom and three patients with lung tumor underwent CT scans for treatment planning. They were treated by VMAT while acquiring projection images to derive their respiratory signals and machine parameters including positions ofmore » multi leaf collimators, dose rates and integrated monitor units. The respiratory signals were divided into 4 and 10 phases and machine parameters were correlated with the divided respiratory signals based on the gantry angle. Dose distributions of each respiratory phase were calculated from plans which were reconstructed from the respiratory signals and the machine parameters during treatment. The doses at isocenter, maximum point and the centroid of target were evaluated. Results and Discussion: Dose distributions during treatment were calculated using the machine parameters and the respiratory signals detected from projection images. Maximum dose difference between plan and in treatment distribution was −1.8±0.4% at centroid of target and dose differences of evaluated points between 4 and 10 phases were no significant. Conclusion: The present method successfully evaluated dose distribution using respiratory signals and machine parameters during treatment. This method is feasible to verify the actual dose for moving target.« less

  3. File format for normalizing radiological concentration exposure rate and dose rate data for the effects of radioactive decay and weathering processes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kraus, Terrence D.

    2017-04-01

    This report specifies the electronic file format that was agreed upon to be used as the file format for normalized radiological data produced by the software tool developed under this TI project. The NA-84 Technology Integration (TI) Program project (SNL17-CM-635, Normalizing Radiological Data for Analysis and Integration into Models) investigators held a teleconference on December 7, 2017 to discuss the tasks to be completed under the TI program project. During this teleconference, the TI project investigators determined that the comma-separated values (CSV) file format is the most suitable file format for the normalized radiological data that will be outputted frommore » the normalizing tool developed under this TI project. The CSV file format was selected because it provides the requisite flexibility to manage different types of radiological data (i.e., activity concentration, exposure rate, dose rate) from other sources [e.g., Radiological Assessment and Monitoring System (RAMS), Aerial Measuring System (AMS), Monitoring and Sampling). The CSV file format also is suitable for the file format of the normalized radiological data because this normalized data can then be ingested by other software [e.g., RAMS, Visual Sampling Plan (VSP)] used by the NA-84’s Consequence Management Program.« less

  4. Weldon Spring Site Remedial Action Project Federal Facilities Agreement: Quarterly environmental data summary for third quarter 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-11-06

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the third quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the third quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Significant data, defined as data values thatmore » have exceeded defined above normal Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits, and other guidelines. The procedures also establish actions to be taken in the event that above normal data occur.« less

  5. Environmental Assessment for the Tula Peak Road Intersection

    DTIC Science & Technology

    2009-07-01

    essential habitat and as outlined in the Storm Water Pollution Prevention Plan (SWPPP). Long term monitoring will be conducted until the soil is...went beyond the evaluated impact. The actual breach of policy was not discovered until a routine storm water inspection questioned the inadequacy of...project called for disturbing less than one acre, no SWPPP was · originally called for. Upon inspection by the Holloman AFB Storm Water manager, the

  6. The Radio JOVE Project: A Worldwide, Ground-Based, Amateur, Decameter-Wavelength Radio Observatory Network

    NASA Astrophysics Data System (ADS)

    Thieman, J.; Higgins, C.; Flagg, R.; Sky, J.

    2003-05-01

    The Radio JOVE project began over four years ago as an education-centered program to inspire secondary school students' interest in space science through hands-on radio astronomy. Students build a radio receiver and antenna kit capable of receiving Jovian, solar, and galactic emissions at a frequency of 20.1 MHz. More than 500 of these kits have been distributed to students and interested observers (ages 10 through adult) in 24 countries. For those who are not comfortable building their own kit, the Radio JOVE project has made it possible to monitor real-time data and streaming audio online from professional radio telescopes in Florida (http://jupiter.kochi-ct.jp) and Hawaii (http://jupiter.wcc.hawaii.edu/newradiojove/main.html). Freely downloadable software called Radio-Skypipe (http://radiosky.com) emulates a chart recorder to monitor ones own radio telescope or the telescopes of other observers worldwide who send out their data over the Internet. A built-in chat feature allows the users to discuss their observations and results in real time. New software is being developed to allow network users to interactively view a multi-frequency spectroscopic display of the Hawaii radio telescope. The Radio JOVE project is also partnering with NASA's Student Observation Network (http://sunearth.gsfc.nasa.gov/sunearthday/2003/networkintro.htm) in an effort to use online collaborations to monitor and track solar storms as a hands-on science experience for students. We believe the amateur network data to be of value to the research community and would like to have students more directly connected to ongoing research projects to enhance their interest in participating. Results of the project and plans for the future will be highlighted.

  7. Duck Valley Resident Fish Stocking Program, 2000 Final Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dodson, Guy; Pero, Vincent

    The Shoshone-Paiute Tribes fish-stocking program was begun in 1988 and is intended to provide a subsistence fishery for the tribal members. The program stocks catchable and fingerling size trout in Mt. View and Sheep Creek Reservoirs. Rainbow trout are purchased from only certified disease-free facilities to be stocked in our reservoirs. This project will help restore a fishery for tribal members that historically depended on wild salmon and steelhead in the Owyhee and Bruneau Rivers and their tributaries for their culture as well as for subsistence. This project is partial substitution for loss of anadromous fish production due to constructionmore » and operation of hydroelectric dams on the Columbia and Snake Rivers. Until anadromous fish can be returned to the Owyhee and Bruneau Rivers this project will continue indefinitely. As part of this project the Shoshone-Paiute Tribes will also receive income in the form of fees from non-tribal members who come to fish these reservoirs. Regular monitoring and evaluation of the fishery will include sampling for length/weight/condition and for signs of disease. A detailed Monitoring and evaluation plan has been put in place for this project. However due to budget limitations on this project only the fishery surveys and limited water quality work can be completed. A creel survey was initiated in 1998 and we are following the monitoring and evaluation schedule for this program (as budget allows) as well as managing the budget and personnel. This program has been very successful in the past decade and has provided enjoyment and sustenance for both tribal and non-tribal members. All biological data and stocking rates will be including in the Annual reports to Bonneville Power Administration (BPA).« less

  8. KDHE Project Code: C6-074-00002: Progress and Monitoring Report for the LDB/SVE/AS System at the Former CCC/USDA Grain Storage Facility, Agra, Kansas, in January-June 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA implemented a source area cleanup in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup involves five large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparge (AS) systems. The work plan was approved by the Kansas Department of Health and Environment (KDHE) in November 2008 (KDHE 2008b), and operation began in May 2009.

  9. KDHE Project Code: C6-074-00002: Progress and Monitoring Report for the LDB/SVE/AS System at the Former CCC/USDA Grain Storage Facility, Agra, Kansas, in January-June 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine

    In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA implemented a source area cleanup in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup involves five large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparging (AS). The work plan was approved by the Kansas Department of Health and Environment (KDHE) in November 2008 (KDHE 2008b), and operation began in May 2009.

  10. MONET: a MOnitoring NEtwork of Telescopes

    NASA Astrophysics Data System (ADS)

    Hessman, F. V.; Beuermann, K.

    2002-01-01

    MONET is a planned network of two 1m-class robotic telescopes which will be used for various photometric monitoring projects -- variable stars, planet searches, AGN's, GRB's -- as well as by school children in Germany and over the world. The two host partners, the Univ. of Texas' McDonald Observatory and the South African Astronomical Observatory, will operate the telescopes in exchange for observing time on the network. MONET will be one of the first robotic telescope networks offering 1-m class telescopes, complete coverage of the sky, good longitude coverage for long observing sequences on objects near the celestial equator, and a heavy educational emphasis.

  11. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keith, Raymond E.; Heller, Thomas J.; Bush, Stuart A.

    1991-01-01

    This Annual Report on Colorado-Ute Electric Association's NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration planmore » was completed. (VC)« less

  12. Data Management and Data Quality in PERCH, a Large International Case-Control Study of Severe Childhood Pneumonia.

    PubMed

    Watson, Nora L; Prosperi, Christine; Driscoll, Amanda J; Higdon, Melissa M; Park, Daniel E; Sanza, Megan; DeLuca, Andrea N; Awori, Juliet O; Goswami, Doli; Hammond, Emily; Hossain, Lokman; Johnson, Catherine; Kamau, Alice; Kuwanda, Locadiah; Moore, David P; Neyzari, Omid; Onwuchekwa, Uma; Parker, David; Sapchookul, Patranuch; Seidenberg, Phil; Shamsul, Arifin; Siazeele, Kazungu; Srisaengchai, Prasong; Sylla, Mamadou; Levine, Orin S; Murdoch, David R; O'Brien, Katherine L; Wolff, Mark; Deloria Knoll, Maria

    2017-06-15

    The Pneumonia Etiology Research for Child Health (PERCH) study is the largest multicountry etiology study of pediatric pneumonia undertaken in the past 3 decades. The study enrolled 4232 hospitalized cases and 5325 controls over 2 years across 9 research sites in 7 countries in Africa and Asia. The volume and complexity of data collection in PERCH presented considerable logistical and technical challenges. The project chose an internet-based data entry system to allow real-time access to the data, enabling the project to monitor and clean incoming data and perform preliminary analyses throughout the study. To ensure high-quality data, the project developed comprehensive quality indicator, data query, and monitoring reports. Among the approximately 9000 cases and controls, analyzable laboratory results were available for ≥96% of core specimens collected. Selected approaches to data management in PERCH may be extended to the planning and organization of international studies of similar scope and complexity. © The Author 2017. Published by Oxford University Press for the Infectious Diseases Society of America.

  13. Outcome mapping for fostering and measuring change in risk management behaviour among urban dairy farmers in Nairobi, Kenya.

    PubMed

    Nyangaga, Julius N; Grace, Delia; Kimani, Violet; Kiragu, Monica W; Langat, Alfred K; Mbugua, Gabriel; Mitoko, Grace; Kang'ethe, Erastus K

    2012-09-01

    A study was undertaken to investigate and mitigate the risk from zoonotic Cryptosporidium associated with dairy farming in Dagoretti division, Nairobi, Kenya. Outcome mapping (OM), a relatively new tool for planning and evaluation, was used to foster and then monitor changes in farmer management of health risks. Elements of the OM framework, including the vision, mission and expected progress markers, were developed in participatory sessions and a set of progress markers was used for monitoring behaviour change in farmers participating in the project (the boundary partners). Behaviour change (the outcome challenge) was supported by a range of awareness and educational campaigns, working with strategic partners (extension agents and administrative leaders). The farmers the project worked with made considerable progress according to the markers; they demonstrated an understanding of cryptosporidiosis, established or maintained clean and well drained cattle sheds, and took conscious effort to reduce possible infection. Farmers who did not participate in the project (non-contact farmers) were found to be less advanced on the progress marker indicators. Non-contact farmers who carried out risk-reducing practices had done so independently of the project team. The administration leaders, as strategic partners, had a positive attitude towards the project and confidence in their ability to support project objectives. The study demonstrates the utility of OM in helping to identify and support behavioural change.

  14. Software metrics: The key to quality software on the NCC project

    NASA Technical Reports Server (NTRS)

    Burns, Patricia J.

    1993-01-01

    Network Control Center (NCC) Project metrics are captured during the implementation and testing phases of the NCCDS software development lifecycle. The metrics data collection and reporting function has interfaces with all elements of the NCC project. Close collaboration with all project elements has resulted in the development of a defined and repeatable set of metrics processes. The resulting data are used to plan and monitor release activities on a weekly basis. The use of graphical outputs facilitates the interpretation of progress and status. The successful application of metrics throughout the NCC project has been instrumental in the delivery of quality software. The use of metrics on the NCC Project supports the needs of the technical and managerial staff. This paper describes the project, the functions supported by metrics, the data that are collected and reported, how the data are used, and the improvements in the quality of deliverable software since the metrics processes and products have been in use.

  15. Subsurface Monitoring of CO2 Sequestration - A Review and Look Forward

    NASA Astrophysics Data System (ADS)

    Daley, T. M.

    2012-12-01

    The injection of CO2 into subsurface formations is at least 50 years old with large-scale utilization of CO2 for enhanced oil recovery (CO2-EOR) beginning in the 1970s. Early monitoring efforts had limited measurements in available boreholes. With growing interest in CO2 sequestration beginning in the 1990's, along with growth in geophysical reservoir monitoring, small to mid-size sequestration monitoring projects began to appear. The overall goals of a subsurface monitoring plan are to provide measurement of CO2 induced changes in subsurface properties at a range of spatial and temporal scales. The range of spatial scales allows tracking of the location and saturation of the plume with varying detail, while finer temporal sampling (up to continuous) allows better understanding of dynamic processes (e.g. multi-phase flow) and constraining of reservoir models. Early monitoring of small scale pilots associated with CO2-EOR (e.g., the McElroy field and the Lost Hills field), developed many of the methodologies including tomographic imaging and multi-physics measurements. Large (reservoir) scale sequestration monitoring began with the Sleipner and Weyburn projects. Typically, large scale monitoring, such as 4D surface seismic, has limited temporal sampling due to costs. Smaller scale pilots can allow more frequent measurements as either individual time-lapse 'snapshots' or as continuous monitoring. Pilot monitoring examples include the Frio, Nagaoka and Otway pilots using repeated well logging, crosswell imaging, vertical seismic profiles and CASSM (continuous active-source seismic monitoring). For saline reservoir sequestration projects, there is typically integration of characterization and monitoring, since the sites are not pre-characterized resource developments (oil or gas), which reinforces the need for multi-scale measurements. As we move beyond pilot sites, we need to quantify CO2 plume and reservoir properties (e.g. pressure) over large scales, while still obtaining high resolution. Typically the high-resolution (spatial and temporal) tools are deployed in permanent or semi-permanent borehole installations, where special well design may be necessary, such as non-conductive casing for electrical surveys. Effective utilization of monitoring wells requires an approach of modular borehole monitoring (MBM) were multiple measurements can be made. An example is recent work at the Citronelle pilot injection site where an MBM package with seismic, fluid sampling and distributed fiber sensing was deployed. For future large scale sequestration monitoring, an adaptive borehole-monitoring program is proposed.

  16. 6. Monitoring and the Northwest Forest Plan

    Treesearch

    Leslie M. Reid

    1994-01-01

    Abstract - Monitoring will ensure that the Northwest Forest Plan is implemented as intended, determine whether the plan is achieving its intended objectives, and provide information needed to improve the plan. The credibility of the Forest Plan rests on the credibility of its monitoring program. If the monitoring program is to succeed, it must focus on well-defined...

  17. Recommendations for data monitoring committees from the Clinical Trials Transformation Initiative.

    PubMed

    Calis, Karim A; Archdeacon, Patrick; Bain, Raymond; DeMets, David; Donohue, Miriam; Elzarrad, M Khair; Forrest, Annemarie; McEachern, John; Pencina, Michael J; Perlmutter, Jane; Lewis, Roger J

    2017-08-01

    Background/aims Use of data monitoring committees to oversee clinical trials was first proposed nearly 50 years ago. Since then, data monitoring committee use in clinical trials has increased and evolved. Nonetheless, there are no well-defined criteria for determining the need for a data monitoring committee, and considerable variability exists in data monitoring committee composition and conduct. To understand and describe the role and function of data monitoring committees, and establish best practices for data monitoring committee trial oversight, the Clinical Trials Transformation Initiative-a public-private partnership to improve clinical trials-launched a multi-stakeholder project. Methods The data monitoring committee project team included 16 individuals charged with (1) clarifying the purpose of data monitoring committees, (2) identifying best practices for independent data monitoring committee conduct, (3) describing effective communication practices, and (4) developing strategies for training data monitoring committee members. Evidence gathering included a survey, a series of focus group discussions, and a 2-day expert meeting aimed at achieving consensus opinions that form the foundation of our data monitoring committee recommendations. Results We define the role of the data monitoring committee as an advisor to the research sponsor on whether to continue, modify, or terminate a trial based on periodic assessment of trial data. Data monitoring committees should remain independent from the sponsor and be composed of members with no relevant conflicts of interest. Representation on a data monitoring committee generally should include at least one clinician with expertise in the therapeutic area being studied, a biostatistician, and a designated chairperson who has experience with clinical trials and data monitoring. Data monitoring committee meetings are held periodically to evaluate the unmasked data from ongoing trials, but the content and conduct of meetings may vary depending on specific goals or topics for deliberation. To guide data monitoring committee conduct and communication plans, a charter consistent with the protocol's research design and statistical analysis plan should be developed and agreed upon by the sponsor and the data monitoring committee prior to patient enrollment. We recommend concise and flexible charters that explain roles, responsibilities, operational issues, and how data monitoring committee recommendations are generated and communicated. The demand for data monitoring committee members appears to exceed the current pool of qualified individuals. To prepare a new generation of trained data monitoring committee members, we encourage a combination of didactic educational programs, practical experience, and skill development through apprenticeships and mentoring by experienced data monitoring committee members. Conclusion Our recommendations address data monitoring committee use, conduct, communication practices, and member preparation and training. Furthermore recommendations form the foundation for ongoing efforts to improve clinical trial oversight and enhance the safety and integrity of clinical research. These recommendations serve as a call to action for implementation of best practices that benefit study participants, study sponsors, and society.

  18. 40 CFR 141.601 - Standard monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Standard monitoring. 141.601 Section... Standard monitoring. (a) Standard monitoring plan. Your standard monitoring plan must comply with paragraphs (a)(1) through (a)(4) of this section. You must prepare and submit your standard monitoring plan...

  19. Review of Quantitative Monitoring Methodologies for Emissions Verification and Accounting for Carbon Dioxide Capture and Storage for California’s Greenhouse Gas Cap-and-Trade and Low-Carbon Fuel Standard Programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oldenburg, Curtis M.; Birkholzer, Jens T.

    The Cap-and-Trade and Low Carbon Fuel Standard (LCFS) programs being administered by the California Air Resources Board (CARB) include Carbon Dioxide Capture and Storage (CCS) as a potential means to reduce greenhouse gas (GHG) emissions. However, there is currently no universal standard approach that quantifies GHG emissions reductions for CCS and that is suitable for the quantitative needs of the Cap-and-Trade and LCFS programs. CCS involves emissions related to the capture (e.g., arising from increased energy needed to separate carbon dioxide (CO 2) from a flue gas and compress it for transport), transport (e.g., by pipeline), and storage of COmore » 2 (e.g., due to leakage to the atmosphere from geologic CO 2 storage sites). In this project, we reviewed and compared monitoring, verification, and accounting (MVA) protocols for CCS from around the world by focusing on protocols specific to the geologic storage part of CCS. In addition to presenting the review of these protocols, we highlight in this report those storage-related MVA protocols that we believe are particularly appropriate for CCS in California. We find that none of the existing protocols is completely appropriate for California, but various elements of all of them could be adopted and/or augmented to develop a rigorous, defensible, and practical surface leakage MVA protocol for California. The key features of a suitable surface leakage MVA plan for California are that it: (1) informs and validates the leakage risk assessment, (2) specifies use of the most effective monitoring strategies while still being flexible enough to accommodate special or site-specific conditions, (3) quantifies stored CO 2, and (4) offers defensible estimates of uncertainty in monitored properties. California’s surface leakage MVA protocol needs to be applicable to the main CO 2 storage opportunities (in California and in other states with entities participating in California’s Cap-and-Trade or LCFS programs), specifically CO 2-enhanced oil recovery (CO 2-EOR), CO 2 injection into depleted gas reservoirs (with or without CO 2-enhanced gas recovery (CO 2-EGR)), as well as deep saline storage. Regarding the elements of an effective surface leakage MVA protocol, our recommendations for California are that: (1) both CO 2 and methane (CH 4) surface leakage should be monitored, especially for enhanced recovery scenarios, (2) emissions from all sources not directly related to injection and geologic storage (e.g., from capture, or pipeline transport) should be monitored and reported under a plan separate from the surface leakage MVA plan that is included as another component of the quantification methodology (QM), (3) the primary objective of the surface leakage MVA plan should be to quantify surface leakage of CO 2 and CH 4 and its uncertainty, with consideration of best-practices and state-of-the-art approaches to monitoring including attribution assessment, (4) effort should be made to monitor CO 2 storage and migration in the subsurface to anticipate future surface leakage monitoring needs, (5) detailed descriptions of specific monitoring technologies and approaches should be provided in the MVA plan, (6) the main purpose of the CO 2 injection project (CO 2-EOR, CO 2-EGR, or pure geologic carbon sequestration (GCS)) needs to be stated up front, (7) approaches to dealing with missing data and quantifying uncertainty need to be described, and (8) post-injection monitoring should go on for a period consistent with or longer than that prescribed by the U.S. EPA.« less

  20. Installation of Groundwater Monitoring Wells TAV-MW15 and TAV-MW16.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lum, Clinton C. L.

    This report documents the installation of two groundwater monitoring wells at the Technical Area V Groundwater (TAVG) Area of Concern at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM is managed and operated by National Technology and Engineering Solutions of Sandia, LLC., a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA- 0003525. Well installation activities were conducted in accordance with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB)-approved work plan Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern (Workmore » Plan) (SNL/NM March 2016). The Work Plan was approved by NMED HWB prior to the start of field work (NMED May 2016). Project activities were performed from November 2016 through January 2017 by SNL/NM Environmental Restoration (ER) Operations personnel, and the SNL/NM drilling contractor Cascade Drilling LP. Drilling activities began with borehole drilling and sampling on November 30, 2016. Well construction and development fieldwork was completed on January 31, 2017. Land surveys to establish the location coordinates and elevations of the two wells were completed on March 23, 2017, and transmitted to SNL/NM personnel on April 17, 2017.« less

  1. River Bank Erosion and the Influence of Environmental Flow Management.

    PubMed

    Vietz, Geoff J; Lintern, Anna; Webb, J Angus; Straccione, David

    2018-03-01

    Environmental flows aim to influence river hydrology to provide appropriate physical conditions for ecological functioning within the restrictions of flow regulation. The hydrologic characteristics of flow events, however, may also lead to unintended morphologic effects in rivers, such as increases in riverbank erosion beyond natural rates. This may negatively impact habitat for biota, riparian infrastructure, and land use. Strategic environmental flow delivery linked to monitoring and adaptive management can help mitigate risks. We monitor riverbank condition (erosion and deposition) relative to environmental flows on the Goulburn River, Victoria, Australia. We describe the process of adaptive management aimed at reducing potential impacts of flow management on bank condition. Field measurements (erosion pins) quantify the hydrogeomorphic response of banks to the delivery of planned and natural flow events. Managed flows provide opportunities for monitoring riverbank response to flows, which in turn informs planning. The results demonstrate that environmental flows have little influence on bank erosion and visual perceptions in the absence of monitoring are an unreliable guide. This monitoring project represents a mutually beneficial, science-practice partnership demonstrating that a traditional 'know then do' approach can be foreshortened by close collaboration between researchers and managers. To do so requires transparent, often informal lines of communication. The benefits for researchers-a more strategic and targeted approach to monitoring activities; and benefits for the practitioners-reduced time between actions and understanding response; mean that a learn by doing approach is likely to have better outcomes for researchers, stakeholders, the public, and the environment.

  2. River Bank Erosion and the Influence of Environmental Flow Management

    NASA Astrophysics Data System (ADS)

    Vietz, Geoff J.; Lintern, Anna; Webb, J. Angus; Straccione, David

    2018-03-01

    Environmental flows aim to influence river hydrology to provide appropriate physical conditions for ecological functioning within the restrictions of flow regulation. The hydrologic characteristics of flow events, however, may also lead to unintended morphologic effects in rivers, such as increases in riverbank erosion beyond natural rates. This may negatively impact habitat for biota, riparian infrastructure, and land use. Strategic environmental flow delivery linked to monitoring and adaptive management can help mitigate risks. We monitor riverbank condition (erosion and deposition) relative to environmental flows on the Goulburn River, Victoria, Australia. We describe the process of adaptive management aimed at reducing potential impacts of flow management on bank condition. Field measurements (erosion pins) quantify the hydrogeomorphic response of banks to the delivery of planned and natural flow events. Managed flows provide opportunities for monitoring riverbank response to flows, which in turn informs planning. The results demonstrate that environmental flows have little influence on bank erosion and visual perceptions in the absence of monitoring are an unreliable guide. This monitoring project represents a mutually beneficial, science-practice partnership demonstrating that a traditional `know then do' approach can be foreshortened by close collaboration between researchers and managers. To do so requires transparent, often informal lines of communication. The benefits for researchers-a more strategic and targeted approach to monitoring activities; and benefits for the practitioners-reduced time between actions and understanding response; mean that a learn by doing approach is likely to have better outcomes for researchers, stakeholders, the public, and the environment.

  3. Assessment of the National Research Universal Reactor Proposed New Stack Sampling Probe Location for Compliance with ANSI/HPS N13.1-1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glissmeyer, John A.; Antonio, Ernest J.; Flaherty, Julia E.

    2016-02-29

    This document reports on a series of tests conducted to assess the proposed air sampling location for the National Research Universal reactor (NRU) complex exhaust stack, located in Chalk River, Ontario, Canada, with respect to the applicable criteria regarding the placement of an air sampling probe. Due to the age of the equipment in the existing monitoring system, and the increasing difficulty in acquiring replacement parts to maintain this equipment, a more up-to-date system is planned to replace the current effluent monitoring system, and a new monitoring location has been proposed. The new sampling probe should be located within themore » exhaust stack according to the criteria established by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities. These criteria address the capability of the sampling probe to extract a sample that represents the effluent stream. The internal Pacific Northwest National Laboratory (PNNL) project for this task was 65167, Atomic Energy Canada Ltd. Chalk River Effluent Duct Flow Qualification. The testing described in this document was guided by the Test Plan: Testing of the NRU Stack Air Sampling Position (TP-STMON-032).« less

  4. [Project design and implementation of the fourth national survey Chinese matiera medica resources].

    PubMed

    Huang, Lu-Qi; Lu, Jian-Wei; Guo, Lan-Ping; Zhang, Xiao-Bo; Zhao, Run-Huai; Zhang, Ben-Gang; Li, Yu; Su, Gang-Qiang; Li, Da-Ning

    2013-03-01

    The planning of the fourth national survey on Chinese materia medica resources shall follow the requirement of "carrying out the national survey on Chinese materia medica resources, strengthening the construction of Chinese materia medica resources monitoring and information network" which is according to the document issued by the State Council. Based on the responsibilities of State Administration of Traditional Chinese Medicine which is "organizing the survey, promoting the resource-protection, keeping development and rational utilization", combined with the key problems that need to be solved in current medicinal industry, the related instructions issued by central leadership and the recommendations from NPC delegates, CPPCC members and experts, the planning shall make overall plans and top-level design for the new round of national survey on Chinese materia medica resources.

  5. Applications of turbidity monitoring to forest management in California.

    PubMed

    Harris, Richard R; Sullivan, Kathleen; Cafferata, Peter H; Munn, John R; Faucher, Kevin M

    2007-09-01

    Many California streams have been adversely affected by sedimentation caused by historic and current land uses, including timber harvesting. The impacts of timber harvesting and logging transportation systems on erosion and sediment delivery can be directly measured, modeled, or inferred from water quality measurements. California regulatory agencies, researchers, and land owners have adopted turbidity monitoring to determine effects of forest management practices on suspended sediment loads and water quality at watershed, project, and site scales. Watershed-scale trends in sediment discharge and responses to current forest practices may be estimated from data collected at automated sampling stations that measure turbidity, stream flow, suspended sediment concentrations, and other water quality parameters. Future results from these studies will provide a basis for assessing the effectiveness of modern forest practice regulations in protecting water quality. At the project scale, manual sampling of water column turbidity during high stream flow events within and downstream from active timber harvest plans can identify emerging sediment sources. Remedial actions can then be taken by managers to prevent or mitigate water quality impacts. At the site scale, manual turbidity sampling during storms or high stream flow events at sites located upstream and downstream from new, upgraded, or decommissioned stream crossings has proven to be a valuable way to determine whether measures taken to prevent post-construction erosion and sediment production are effective. Turbidity monitoring at the project and site scales is therefore an important tool for adaptive management. Uncertainty regarding the effects of current forest practices must be resolved through watershed-scale experiments. In the short term, this uncertainty will stimulate increased use of project and site-scale monitoring.

  6. May 2012 Groundwater and Surface Water Sampling at the Rio Blanco, Colorado, Site (Data Validation Package)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hutton, Rick

    2012-12-01

    Annual sampling was conducted at the Rio Blanco, Colorado, site for the Long-Term Hydrologic Monitoring Program May 9-10, 2012, to monitor groundwater and surface water for potential radionuclide contamination. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for the U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). A duplicate sample was collected from location Johnson Artesian WL. Samples were analyzed for gamma-emitting radionuclides by high-resolution gamma spectrometry and for tritium using the conventional and enrichment methods. Results of this monitoring at the Rio Blanco site demonstrate that groundwater and surface water outsidemore » the site boundaries have not been affected by project-related contaminants.« less

  7. 40 CFR 75.62 - Monitoring plan submittals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... representative for an affected unit shall submit a complete, electronic, up-to-date monitoring plan file (except... quarterly report for a reporting quarter where an update of the electronic monitoring plan information is... associated, pursuant to § 75.53(b). Electronic submittal of all monitoring plan information, including...

  8. Diagnosis of sustainable collaboration in health promotion – a case study

    PubMed Central

    Leurs, Mariken TW; Mur-Veeman, Ingrid M; van der Sar, Rosalie; Schaalma, Herman P; de Vries, Nanne K

    2008-01-01

    Background Collaborations are important to health promotion in addressing multi-party problems. Interest in collaborative processes in health promotion is rising, but still lacks monitoring instruments. The authors developed the DIagnosis of Sustainable Collaboration (DISC) model to enable comprehensive monitoring of public health collaboratives. The model focuses on opportunities and impediments for collaborative change, based on evidence from interorganizational collaboration, organizational behavior and planned organizational change. To illustrate and assess the DISC-model, the 2003/2004 application of the model to the Dutch whole-school health promotion collaboration is described. Methods The study combined quantitative research, using a cross-sectional survey, with qualitative research using the personal interview methodology and document analysis. A DISC-based survey was sent to 55 stakeholders in whole-school health promotion in one Dutch region. The survey consisted of 22 scales with 3 to 8 items. Only scales with a reliability score of 0.60 were accepted. The analysis provided for comparisons between stakeholders from education, public service and public health. The survey was followed by approaching 14 stakeholders for a semi-structured DISC-based interview. As the interviews were timed after the survey, the interviews were used to clarify unexpected and unclear outcomes of the survey as well. Additionally, a DISC-based document analysis was conducted including minutes of meetings, project descriptions and correspondence with schools and municipalities. Results Response of the survey was 77% and of the interviews 86%. Significant differences between respondents of different domains were found for the following scales: organizational characteristics scale, the change strategies, network development, project management, willingness to commit and innovative actions and adaptations. The interviews provided a more specific picture of the state of the art of the studied collaboration regarding the DISC-constructs. Conclusion The DISC-model is more than just the sum of the different parameters provided in the literature on interorganizational collaboration, organization change, networking and setting-approaches. Monitoring a collaboration based on the DISC-model yields insight into windows of opportunity and current impediments for collaborative change. DISC-based monitoring is a promising strategy enabling project managers and social entrepreneurs to plan change management strategies systematically. PMID:18992132

  9. Molecular Medicine: Synthesis and In Vivo Detection of Agents for use in Boron Neutron Capture Therapy. Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kabalka, G. W.

    2005-06-28

    The primary objective of the project was the development of in vivo methods for the detection and evaluation of tumors in humans. The project was focused on utilizing positron emission tomography (PET) to monitor the distribution and pharamacokinetics of a current boron neutron capture therapy (BNCT) agent, p-boronophenylalanine (BPA) by labeling it with a fluorine-18, a positron emitting isotope. The PET data was then used to develop enhanced treatment planning protocols. The study also involved the synthesis of new tumor selective BNCTagents that could be labeled with radioactive nuclides for the in vivo detection of boron.

  10. Recent Developments in the External Conjugate-T Matching Project at JET

    NASA Astrophysics Data System (ADS)

    Monakhov, I.; Walden, A.

    2007-09-01

    The External Conjugate-T (ECT) matching system is planned for installation on two A2 ICRH antenna arrays at JET in 2007. This will enhance the operational capabilities of the RF plant during ELMy plasma scenarios and create new opportunities for ITER-relevant matching studies. The main features of the project are discussed in the paper focusing on the specific challenges of the ECT automatic matching and arc detection in optimized ELM-tolerant configurations. A `co/counter-clockwise' automatic control mode selection and an Advanced Wave Amplitude Comparison System (AWACS) complementing the existing VSWR monitoring are proposed as simple and viable solutions to the identified problems.

  11. Recent Developments in the External Conjugate-T Matching Project at JET

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Monakhov, I.; Walden, A.

    2007-09-28

    The External Conjugate-T (ECT) matching system is planned for installation on two A2 ICRH antenna arrays at JET in 2007. This will enhance the operational capabilities of the RF plant during ELMy plasma scenarios and create new opportunities for ITER-relevant matching studies. The main features of the project are discussed in the paper focusing on the specific challenges of the ECT automatic matching and arc detection in optimized ELM-tolerant configurations. A 'co/counter-clockwise' automatic control mode selection and an Advanced Wave Amplitude Comparison System (AWACS) complementing the existing VSWR monitoring are proposed as simple and viable solutions to the identified problems.

  12. What Employees Need (and Want) to Hear When Justifying the Suspension of a Regulated Metals Plan for the Processing of Drums Containing Metal Turnings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Todd Potts, T.; Hylko, J.M.

    2008-07-01

    A Regulated Metals Plan (RMP) was implemented for outdoor work activities involving the removal and disposition of approximately 4,000 deteriorated waste drums containing 236 metric tonnes (260 tons) of lead turnings from various, unspecified machine shop facilities at the Paducah Gaseous Diffusion Plant. Until exposure monitoring could prove otherwise, the work area established for processing the drums was conservatively defined as a Lead Regulated Area (LRA) subject to the Occupational Safety and Health Administration's Lead Standard found in Title 29 of the Code of Federal Regulations, Part 1910.1025. The vast majority of the analytical results for the industrial hygiene breathingmore » zone samples collected and tested for arsenic, beryllium, cadmium, chromium, lead, nickel, selenium, silver, and thallium using the National Institute for Occupational Safety and Health's analytical method 7300 were equivalent to the laboratory detection limits for each analyte. All results were less than 6% of their respective Permissible Exposure Limits (PEL), except for one nickel result that was approximately 17% of its PEL. The results provided justification to eventually down-post the LRA to existing employee protection requirements. In addition to removing the deteriorated drums and accompanying debris, the success of this project was quantified in terms of zero recordable injuries. The primary contributor in achieving this success was the sharing and communication of information between management, safety, and the field teams. Specifically, this was what the employees needed (and wanted) to hear when justifying the suspension of the RMP for the processing of drums containing metal turnings. Daily briefings on the status of the project and field monitoring results were just as important as maintaining budget and schedule milestones. Also, the Environmental, Safety and Health organization maintained its presence by continuing to monitor evolving field conditions to ensure the effectiveness of its plans and procedures. (authors)« less

  13. Tectonic and volcanic monitoring using Sentinel-1: Current status and future plans of the COMET InSAR portal

    NASA Astrophysics Data System (ADS)

    Spaans, Karsten; Hatton, Emma; Gonzalez, Pablo; Walters, Richard; McDougall, Alistair; Wright, Tim; Hooper, Andy

    2017-04-01

    The advantages of the Sentinel-1 constellation for InSAR applications over previous radar missions are numerous, and include small baselines, a planned operation time of 20 years, continuous and systematic acquisition of data over tectonic and volcanic areas, near-global coverage of the earth and free data availability. In order to take advantage of these properties, we at the Centre for the Observation and Modelling of Earthquakes, Volcanoes, and Tectonics (COMET) are developing a system that routinely processes and freely distributes interferometric products and time series over tectonic and volcanic regions. This project, and similar efforts at other institutions, will be a game changer for the monitoring and studying of tectonic and volcanic activity using InSAR. Since December 2016, the COMET-LiCS InSAR portal (http://comet.nerc.ac.uk/COMET-LiCS-portal/) has been live, delivering interferograms and coherence estimates over the entire Alpine-Himalayan belt. The portal already contains tens of thousands of products, which can be browsed in a user-friendly portal, and downloaded for free by the general public. For our processing, we use the Climate and Environmental Monitoring from Space (CEMS) facility, where we have large storage and processing facilities to our disposal and a complete duplicate of the Sentinel-1 archive is maintained. This greatly simplifies the infrastructure we have had to develop for automated processing of large areas. Here we will give an overview of the current status of the processing system, as well as discuss future plans. We will cover the infrastructure we developed to automatically produce interferograms and its challenges, and the processing strategy for time series analysis. We will outline the objectives of the system in the near and distant future, and a roadmap for its continued development. Finally, we will highlight some of the scientific results and projects linked to the system.

  14. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  15. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  16. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  17. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  18. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  19. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  20. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  1. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  2. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  3. Unlocking community capability through promotion of self-help for health: experience from Chakaria, Bangladesh.

    PubMed

    Bhuiya, Abbas; Hanifi, Syed Manzoor Ahmed; Hoque, Shahidul

    2016-11-15

    People's participation in health, enshrined in the 1978 Alma Ata declaration, seeks to tap into community capability for better health and empowerment. One mechanism to promote participation in health is through participatory action research (PAR) methods. Beginning in 1994, the Bangladeshi research organization ICDDR,B implemented a project "self-help for health," to work with existing rural self-help organizations (SHOs). SHOs are organizations formed by villagers for their well-being through their own initiatives without external material help. This paper describes the project's implementation, impact, and reflective learnings. Following a self-help conceptual framework and PAR, the project focused on building the capacity of SHOs and their members through training on organizational issues, imparting health literacy, and supporting participatory planning and monitoring. Quarterly activity reports and process documentation were the main sources of qualitative data used for this paper, enabling documentation of changes in organizational issues, as well as the number and nature of initiatives taken by the SHOs in the intervention area. Health and demographic surveillance system (HDSS) data from intervention and comparison areas since 1999 allowed assessment of changes in health indicators over time. Villagers and members of the SHOs actively participated in the self-help activities. SHO functionality increased in the intervention area, in terms of improved organizational processes and planned health activities. These included most notably in convening more regular meetings, identifying community needs, developing and implementing action plans, and monitoring progress and impact. Between 1999 and 2015, while decreases in infant mortality and increases in utilization of at least one antenatal care visit occurred similarly in intervention and comparison areas, increases in immunization, skilled birth attendance, facility deliveries and sanitary latrines were substantially more in intervention than comparison areas. Building community capability by working with pre-existing SHOs, encouraging them to place health on their agendas, strengthening their functioning and implementation of health activities led to sustained improvements in utilization of services for over 20 years. Key elements underpinning success include efforts to build and maintain trust, ensuring social inclusion in project activities, and balancing demands for material resources with flexibility to be responsive to community needs.

  4. Integration of vegetation community spatial data into a prescribed fire planning process at Shenandoah National Park, Virginia (USA)

    USGS Publications Warehouse

    Young, John A.; Mahan, Carolyn G.; Forder, Melissa

    2017-01-01

    Many eastern forest communities depend on fire for regeneration or are enhanced by fire as a restoration practice. However, the use of prescribed fire in the mesic forested environments and the densely populated regions of the eastern United States has been limited. The objective of our research was to develop a science-based approach to prioritizing the use of prescribed fire in appropriate forest types in the eastern United States based on a set of desired management outcomes. Through a process of expert elicitation and data analysis, we assessed and integrated recent vegetation community mapping results along with other available spatial data layers into a spatial prioritization tool for prescribed fire planning at Shenandoah National Park (Virginia, USA). The integration of vegetation spatial data allowed for development of per-pixel priority rankings and exclusion areas enabling precise targeting of fire management activities on the ground, as well as a park-wide ranking of fire planning compartments. We demonstrate the use and evaluation of this approach through implementation and monitoring of a prescribed burn and show that progress is being made toward desired conditions. Integration of spatial data into the fire planning process has served as a collaborative tool for the implementation of prescribed fire projects, which assures projects will be planned in the most appropriate areas to meet objectives that are supported by current science.

  5. Ecological Monitoring and Compliance Program 2006 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David C. Anderson; Paul D. Greger; Derek B. Hall

    2007-03-01

    The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by National Security Technologies LLC (NSTec) during the Calendar Year 2006. Program activities included: (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h)more » monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). Sensitive and protected/regulated species of the NTS include 44 plants, 1 mollusk, 2 reptiles, over 250 birds, and 26 mammals protected, managed, or considered sensitive as per state or federal regulations and natural resource agencies and organizations. The threatened desert tortoise (Gopherus agassizii) is the only species on the NTS protected under the Endangered Species Act. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 34 projects. A total of 342.1 hectares (ha) (845.37 acres [ac]) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found included: 2 inactive tortoise burrows, 2 western burrowing owls (Athene cunicularia hypugaea), several horses (Equus caballus), 2 active predator burrows, mature Joshua trees (Yucca brevifolia), yuccas and cacti; and also 1 bird nest (2 eggs), 1 barn owl (Tyto alba) and 2 great-horned owls (Bubo virginianus). NSTec provided a written summary report of all survey findings and mitigation recommendations, where applicable. All flagged burrows were avoided during construction activities. Twenty one of the 34 projects had sites within the distribution range of the threatened desert tortoise. NNSA/NSO must comply with the terms and conditions of a permit (called a Biological Opinion) from the U.S. Fish and Wildlife Service (FWS) when conducting work in tortoise habitat. No tortoises were found in or displaced from project areas. No desert tortoises were accidentally injured or killed, nor were any captured or displaced from project sites. One desert tortoise was accidentally killed along a paved road. One site specific re-vegetation plan was submitted this year as required by the desert tortoise habitat re-vegetation plan approved in 2004. This year a total of 1.89 ha (4.69 ac) of tortoise habitat was disturbed. Re-vegetation of habitat at the Bren Tower burn was completed in the spring of 2006. In the summer of 2006, NSTec scientists prepared a Biological Assessment of the security activities that were being conducted at the Device Assembly Facility (DAF). NNSA requested a Biological Opinion from FWS in late 2006. Ecosystem mapping and data management in 2006 focused primarily on two tasks: (a) converting hardcopies of about 17 reports (EMAC annual reports and selected topical reports from 1996 to 2003) into electronic versions (Portable Document Format [PDF] files) to facilitate electronic document exchange, rapid retrieval, duplication, and printing, and (b) conducting an annual vegetation survey to determine wildland fire hazards on the NTS. Copies of the PDF documents were sent to DOE's Office of Scientific and Technical Information website in Oak Ridge, Tennessee, and the DOE National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Public Reading Facility.« less

  6. Ecological Monitoring and Compliance Program 2006 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David C. Anderson; Paul D. Greger; Derek B. Hall

    2007-03-01

    The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by National Security Technologies LLC (NSTec) during the Calendar Year 2006. Program activities included: (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h)more » monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). Sensitive and protected/regulated species of the NTS include 44 plants, 1 mollusk, 2 reptiles, over 250 birds, and 26 mammals protected, managed, or considered sensitive as per state or federal regulations and natural resource agencies and organizations. The threatened desert tortoise (Gopherus agassizii) is the only species on the NTS protected under the Endangered Species Act. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 34 projects. A total of 342.1 hectares (ha) (845.37 acres [ac]) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found included: 2 inactive tortoise burrows, 2 western burrowing owls (Athene cunicularia hypugaea), several horses (Equus caballus), 2 active predator burrows, mature Joshua trees (Yucca brevifolia), yuccas and cacti; and also 1 bird nest (2 eggs), 1 barn owl (Tyto alba) and 2 great-horned owls (Bubo virginianus). NSTec provided a written summary report of all survey findings and mitigation recommendations, where applicable. All flagged burrows were avoided during construction activities. Twenty one of the 34 projects had sites within the distribution range of the threatened desert tortoise. NNSA/NSO must comply with the terms and conditions of a permit (called a Biological Opinion) from the U.S. Fish and Wildlife Service (FWS) when conducting work in tortoise habitat. No tortoises were found in or displaced from project areas. No desert tortoises were accidentally injured or killed, nor were any captured or displaced from project sites. One desert tortoise was accidentally killed along a paved road. One site specific revegetation plan was submitted this year as required by the desert tortoise habitat revegetation plan approved in 2004. This year a total of 1.89 ha (4.69 ac) of tortoise habitat was disturbed. Revegetation of habitat at the Bren Tower burn was completed in the spring of 2006. In the summer of 2006, NSTec scientists prepared a Biological Assessment of the security activities that were being conducted at the Device Assembly Facility (DAF). NNSA requested a Biological Opinion from FWS in late 2006. Ecosystem mapping and data management in 2006 focused primarily on two tasks: (a) converting hardcopies of about 17 reports (EMAC annual reports and selected topical reports from 1996 to 2003) into electronic versions (Portable Document Format [PDF] files) to facilitate electronic document exchange, rapid retrieval, duplication, and printing, and (b) conducting an annual vegetation survey to determine wildland fire hazards on the NTS.« less

  7. Hood River Fish Habitat Project; Confederated Tribes of the Warm Springs Reservation of Oregon, Annual Report 2001-2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vaivoda, Alexis

    2003-11-01

    This report summarizes the project implementation and monitoring of all habitat activities that occurred over Fiscal Year 2002 (FY 02). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 02. A description of the progress during FY 02 and reasoning for deviation from the original tasks and timeline are given. OBJECTIVE 1--Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administration oversight and coordination of the habitat statement of work, budget, subcontracts and personnel was provided. OBJECTIVE 2--Develop, coordinate, and implement the Hood River Fishmore » Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document is utilized for many purposes including: drafting the Watershed Action Plan, ranking projects for funding, and prioritizing projects to target in the future. This document was updated and revised to reflect changes to fish habitat and needs in the Hood River basin based upon other documents and actions taken in the basin. OBJECTIVE 3--Assist Middle Fork Irrigation District in developing an alternative irrigation water source on Evans Creek (Hutson pond and Evans Creek diversion), eliminating the need for irrigation diversion dams which happen to be partial fish barriers. Upon completion, this project will restore 2.5 miles of access for winter steelhead, coho salmon, and resident trout habitat. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. During FY 02 the final engineering was completed on this project. However, due to a lengthy permitting process and NMFS consultation, this project was inadvertently delayed. Project completion is expected in July 2003. OBJECTIVE 4--Assist the Farmers Irrigation District (FID) in construction and installation of a new fish screen and bypass system on the mainstem Hood River (Farmers Canal). Final engineering and design for the horizontal screen was completed during the winter of 2001. In December 2001 and January 2002, the concrete work was completed and the head gates were mounted. During the spring the secondary head level control gates were installed. In September 2002, the jersey barriers and vortex tubes were installed. These are located upstream of the old drum screen, and are the primary means of dealing with bedload and suspended load from the diversion. The screen surface was also installed in September 2002 and the system accommodated water soon after. Monitoring of these structures in regards to efficiency and possible effects to fish migration is scheduled to occur in spring 2003. The transition from the old canal to the new screen is smooth and currently does not present any problems. The old drum screen is going to remain in place until all the biological and hydrological monitoring is complete to ensure compliance and satisfaction of all agencies involved. OBJECTIVE 5--Assist the East Fork Irrigation District (EFID) in final engineering design and construction of the Central Lateral Canal upgrade and invert siphon. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. During FY 02, a significant portion of the engineering and design work was completed on the EFID Central Lateral Canal upgrade and invert siphon. There were some changes in canal alignment that required further design work and easement acquisition. Time was also spent looking for matching funds and securing a loan by the EFID. Construction initiation is now scheduled for summer 2003. OBJECTIVE 6--Modify and/or eliminate five culverts, three on Baldwin Creek, one on Graham Creek, and one on Evans Creek, which function as barriers to upstream and downstream fish migration. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. There are only two culverts on Baldwin Creek that will be eliminated or modified. Work was initiated on the removal of one of these culverts, and the replacement of the other. The landowner was agreeable and NEPA was initiated. The modification/elimination of these culverts is scheduled for FY 04. The culvert on Graham Creek is a county road, and will be addressed as a fish passage barrier by Hood River County. The Evans Creek culvert was prepared for modification in FY 02, however due to a lengthy permitting process the instream work period was missed. This project is on the schedule for the instream work period of 2003. OBJECTIVE 7--Construct riparian fence to stabilize and improve the riparian zone along the East Fork Hood River and tributaries. Two riparian fencing projects were completed on East Fork Hood River tributaries. The first was on Baldwin Creek, and the second was on Shelly Creek.« less

  8. Summaries of Minnehaha Creek Watershed District Plans/Studies/Reports

    DTIC Science & Technology

    2004-01-30

    34+ Management of all wetland functional assessment data in a Microsoft Access© database "+ Development of a GIS wetland data management system "+ Recommendations...General Task B Design GIS -Based Decision Making Model: Scenario-Based $125,000 $125,000 Model of Landuse Hydro Data Monitoring Task C Water Quality...Landuse and Land cover data + Watershed GIS data layers + Flood Insurance Rate Maps + Proposed project locations + Stream miles, reaches and conditions

  9. Summary of the NASA/MSFC FY-79 Severe Storm and Local Weather research review. [cloud physics, atmospheric electricity, and mesoscale/storm dynamics reserach

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Significant acomplishments, current focus of work, plans for FY-80, and recommendations for new research are outlined for 36 research projects proposed for technical monitoring by the Atmospheric Sciences Division at Marshall Space Flight Center. Topics of the investigations, which were reviewed at a two-day meeting, relate to cloud physics, atmospheric electricity, and mesoscale/storm dynamics.

  10. Communities’ Strategic Opportunities Through Broken Window Repair and Global Commons Improvements

    DTIC Science & Technology

    2014-06-01

    5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Program Executive Office (Integrated...Warfare Systems),16107 Benedict Court,Woodbridge,VA,22191-4302 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND...identified six priorities, areas of focus: continue to focus on institutional reform; re-evaluate our military’s force planning construct ; preparing for a

  11. Understanding Patterns of Team Collaboration Employed To Solve Unique Problems

    DTIC Science & Technology

    2008-06-01

    ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Naval...Postgraduate School,Code IS/Hs,589 Dyer Road,Monterey,CA,93943 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND... organizations , systems, infrastructure, and processes to create and share data, information, and knowledge that is needed for the team to plan

  12. Development of a Maternal, Newborn and Child mHealth Intervention in Thai Nguyen Province, Vietnam: Protocol for the mMom Project

    PubMed Central

    McBride, Bronwyn; Nguyen, Liem Thanh; Wiljer, David; Vu, Nguyen C; Nguyen, Cuong K

    2018-01-01

    Background Ethnic minority women (EMW) living in mountainous areas of northern Vietnam have disproportionately high infant and maternal mortality rates as a result of low maternal health knowledge, poverty, and remoteness from low-capacity health centers. Objective The objective of this study was to describe the protocol for the development and evaluation of the mMom intervention, which is an integrated mobile health (mHealth) system designed to improve maternal and infant health knowledge, and behavior among women in remote areas of Thai Nguyen, Vietnam. Methods This project featured the following four phases: (1) development of an mHealth platform integrated into the existing health management information system in partnership with the provincial health department; (2) ethnographic fieldwork and intervention content development; (3) intervention piloting and implementation; and (4) evaluation of the intervention’s impact on participants’ maternal health knowledge, behavior, and interactions with the health system. Results The mMom project development process resulted in the following: (1) the successful development of the mMom system, including the mHealth platform hardware and integration, the intervention plan and content, and the monitoring and evaluation framework; (2) the piloting and implementation of the intervention as planned; and (3) the implementation of the monitoring and evaluation framework components. Conclusions This protocol outlines the development of the mMom intervention and describes critical next steps in understanding the impact of the intervention on participants and the wider health system in Thai Nguyen province, Vietnam. PMID:29326095

  13. Design of a National Retail Data Monitor for Public Health Surveillance

    PubMed Central

    Wagner, Michael M.; Robinson, J. Michael; Tsui, Fu-Chiang; Espino, Jeremy U.; Hogan, William R.

    2003-01-01

    The National Retail Data Monitor receives data daily from 10,000 stores, including pharmacies, that sell health care products. These stores belong to national chains that process sales data centrally and utilize Universal Product Codes and scanners to collect sales information at the cash register. The high degree of retail sales data automation enables the monitor to collect information from thousands of store locations in near to real time for use in public health surveillance. The monitor provides user interfaces that display summary sales data on timelines and maps. Algorithms monitor the data automatically on a daily basis to detect unusual patterns of sales. The project provides the resulting data and analyses, free of charge, to health departments nationwide. Future plans include continued enrollment and support of health departments, developing methods to make the service financially self-supporting, and further refinement of the data collection system to reduce the time latency of data receipt and analysis. PMID:12807802

  14. Lower Klickitat Riparian and In-channel Habitat Restoration Project; Klickitat Watershed Enhancement, Annual Report 2002-2003.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conley, Will

    2004-01-01

    The overall goal of the Klickitat Watershed Enhancement Project (KWEP) is to restore watershed health to aid recovery of salmonid stocks in the Klickitat subbasin. An emphasis is placed on restoration and protection of stream reaches and watersheds supporting native anadromous fish production, particularly steelhead (Oncorhyncus mykiss; ESA- listed as 'Threatened' within the Mid-Columbia ESU) and spring Chinook (O. tshawytscha). Habitat restoration activities in the Klickitat subbasin augment goals and objectives of the Yakima Klickitat Fisheries Project (YKFP), NPPC Fish and Wildlife Program, Klickitat Subbasin Summary and the NMFS Biological Opinion (All-H paper). Work is conducted to enhance instream andmore » contributing upland habitat to facilitate increased natural production potential for native salmonid stocks. Efforts in the Klickitat Subbasin fall into two main categories: (1) identification and prioritization of sites for protection and restoration activities, (2) implementation of protection and restoration measures. KWEP personnel also assist monitoring efforts of the YKFP Monitoring & Evaluation Project. During the September 2002-August 2003 reporting period, KWEP personnel continued efforts to address feedback from the August 2000 Provincial Review that indicated a need for better information management and development of geographic priorities by: (1) Assisting development of the Strategic Habitat Plan for the Klickitat Lead Entity (Task A3.1) and Klickitat steelhead EDT model (Task A4.1); (2) Improving the functionality of reference point, habitat unit, and large woody debris modules of the habitat database as well as addition of a temperature module (Tasks A1.1-1.2); (3) Continuing development and acquisition of GIS data (Task A1.3); (4) Ongoing data collection efforts to fill information gaps including streamflow, habitat, and temperature (Objectives C1 and C2); and (5) Completion of planning, field work, and hydrologic modeling associated with roads assessment in the White Creek watershed (Task A4.2). Significant milestones associated with restoration projects during the reporting period included: (1) Completion of the Surveyors Fish Creek Passage Enhancement project (Task B2.3); (2) Completion of interagency agreements for the Klickitat Meadows (Task B2.4) and Klickitat Mill (Task B2.10) projects; (3) Completion of topographic surveys for the Klickitat Meadows (Task B2.4), Klickitat River Meadows (Task B2.5), Trout Creek and Bear Creek culvert replacements (Task B2.7), and Snyder Swale II (Task B2.13) projects; (4) Completion of the Snyder Swale II - Phase 1 project (Task B2.13); (5) Completion of design, planning, and permitting for the Klickitat Mill project (Task B2.10) and initiation of construction; (6) Design for the Trout and Bear Creek culverts (B2.7) were brought to the 60% level; and (7) Completion of design work for the for the Klickitat Meadows (Task B2.4) and Klickitat River Meadows (Task B2.5) projects.« less

  15. Program evaluation in integrated resource planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Council, C.D.

    1994-12-31

    The Western Area Power Administration along with the Southwestern and Southeastern Power Administrations joined together to develop a set of integrated resource planning (IRP) tools to help their customers development and implement an IRP process. The project has been entitled the Resource Planning Guide (RPG), and is specifically designed to help small- to mid-sized utilities analyze supply- and demand-side alternatives as part of an IRP process. The RPG project will be available in January 1994 and will include such support as: workshops, technical assistance, an RPG hotline, and an RPG User`s Group for the project. The RPG grew out ofmore » the interest shown by utility customers who wanted a user-friendly tool to aid in their application of the IRP process. The project has been field tested by 43 utilities and related organizations over the last year, has sparked interest both nationally and internationally, and is now available for public use. The program evaluation aspects of the IRP process are heightened by a requirement of the Energy Policy Act of 1992 which requires all long-term power customers of the Western Area Power Administration to develop, implement, and monitor an IRP process. The EPAct defines IRP as: A planning process for new energy resources that evaluates the full range of alternatives, including new generating capacity, power purchases, energy conservation and efficiency, cogeneration and district heating and cooling applications, and renewable energy resources, to provide adequate and reliable service to its electric customers at the lowest system cost. The process takes into account necessary features for system operation, such as diversity, reliability, dispatchability, and other factors of risk; the ability to verify energy savings achieved through energy conservation and efficiency and the projected durability of such savings measured over time; and treats demand and supply resources on a consistent and integrated basis.« less

  16. 36 CFR 219.11 - Monitoring and evaluation for adaptive management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... sustainability in the plan area (§§ 219.19 through 219.21). The strategy must require monitoring of appropriate plan decisions and characteristics of sustainability. (1) Monitoring and evaluation of ecological sustainability. The plan monitoring strategy for the monitoring and evaluation of ecological sustainability must...

  17. Historic AVHRR Processing in the Eumetsat Climate Monitoring Satellite Application Facility (cmsaf) (Invited)

    NASA Astrophysics Data System (ADS)

    Karlsson, K.

    2010-12-01

    The EUMETSAT CMSAF project (www.cmsaf.eu) compiles climatological datasets from various satellite sources with emphasis on the use of EUMETSAT-operated satellites. However, since climate monitoring primarily has a global scope, also datasets merging data from various satellites and satellite operators are prepared. One such dataset is the CMSAF historic GAC (Global Area Coverage) dataset which is based on AVHRR data from the full historic series of NOAA-satellites and the European METOP satellite in mid-morning orbit launched in October 2006. The CMSAF GAC dataset consists of three groups of products: Macroscopical cloud products (cloud amount, cloud type and cloud top), cloud physical products (cloud phase, cloud optical thickness and cloud liquid water path) and surface radiation products (including surface albedo). Results will be presented and discussed for all product groups, including some preliminary inter-comparisons with other datasets (e.g., PATMOS-X, MODIS and CloudSat/CALIPSO datasets). A background will also be given describing the basic methodology behind the derivation of all products. This will include a short historical review of AVHRR cloud processing and resulting AVHRR applications at SMHI. Historic GAC processing is one of five pilot projects selected by the SCOPE-CM (Sustained Co-Ordinated Processing of Environmental Satellite data for Climate Monitoring) project organised by the WMO Space programme. The pilot project is carried out jointly between CMSAF and NOAA with the purpose of finding an optimal GAC processing approach. The initial activity is to inter-compare results of the CMSAF GAC dataset and the NOAA PATMOS-X dataset for the case when both datasets have been derived using the same inter-calibrated AVHRR radiance dataset. The aim is to get further knowledge of e.g. most useful multispectral methods and the impact of ancillary datasets (for example from meteorological reanalysis datasets from NCEP and ECMWF). The CMSAF project is currently defining plans for another five years (2012-2017) of operations and development. New GAC reprocessing efforts are planned and new methodologies will be tested. Central questions here will be how to increase the quantitative use of the products through improving error and uncertainty estimates and how to compile the information in a way to allow meaningful and efficient ways of using the data for e.g. validation of climate model information.

  18. Groundwater Protection Program Management Plan For The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental, LLC

    2009-09-01

    This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with themore » multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of Babcock & Wilcox Technical Services Y-12 LLC (hereafter referenced as B&W Y-12), the Y-12 management and operations (M&O) contractor for DOE. B&W Y-12 is a new corporate name, assumed in January 2007, for the company formerly known as BWXT Y-12, L.L.C., hereafter referenced as BWXT. This GWPP management plan addresses the requirements of DOE Order 450.1A Environmental Protection Program (hereafter referenced as DOE O 450.1A), which emphasize a site-wide approach for groundwater protection at each DOE facility through implementation of groundwater surveillance monitoring. Additionally, this plan addresses the relevant and applicable GWPP elements and goals described in the DOE O 450.1A technical guidance documents issued in June 2004 (DOE 2004) and May 2005 (DOE 2005). This GWPP management plan is a 'living' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.« less

  19. [Healthy Cities projects].

    PubMed

    Takano, Takehito

    2002-05-01

    This is a review article on "Healthy Cities". The Healthy Cities programme has been developed by the World Health Organization (WHO) to tackle urban health and environmental issues in a broad way. It is a kind of comprehensive policy package to carry out individual projects and activities effectively and efficiently. Its key aspects include healthy public policy, vision sharing, high political commitment, establishment of structural organization, strategic health planning, intersectoral collaboration, community participation, setting approach, development of supportive environment for health, formation of city health profile, national and international networking, participatory research, periodic monitoring and evaluation, and mechanisms for sustainability of projects. The present paper covered the Healthy Cities concept and approaches, rapid urbanization in the world, developments of WHO Healthy Cities, Healthy Cities developments in the Western Pacific Region, the health promotion viewpoint, and roles of research.

  20. Cascaded Microinverter PV System for Reduced Cost

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bellus, Daniel R.; Ely, Jeffrey A.

    2013-04-29

    In this project, a team led by Delphi will develop and demonstrate a novel cascaded photovoltaic (PV) inverter architecture using advanced components. This approach will reduce the cost and improve the performance of medium and large-sized PV systems. The overall project objective is to develop, build, and test a modular 11-level cascaded three-phase inverter building block for photovoltaic applications and to develop and analyze the associated commercialization plan. The system will be designed to utilize photovoltaic panels and will supply power to the electric grid at 208 VAC, 60 Hz 3-phase. With the proposed topology, three inverters, each with anmore » embedded controller, will monitor and control each of the cascade sections, reducing costs associated with extra control boards. This report details the final disposition on this project.« less

  1. Integration of research advances in modelling and monitoring in support of WFD river basin management planning in the context of climate change.

    PubMed

    Quevauviller, Philippe; Barceló, Damia; Beniston, Martin; Djordjevic, Slobodan; Harding, Richard J; Iglesias, Ana; Ludwig, Ralf; Navarra, Antonio; Navarro Ortega, Alícia; Mark, Ole; Roson, Roberto; Sempere, Daniel; Stoffel, Markus; van Lanen, Henny A J; Werner, Micha

    2012-12-01

    The integration of scientific knowledge about possible climate change impacts on water resources has a direct implication on the way water policies are being implemented and evolving. This is particularly true regarding various technical steps embedded into the EU Water Framework Directive river basin management planning, such as risk characterisation, monitoring, design and implementation of action programmes and evaluation of the "good status" objective achievements (in 2015). The need to incorporate climate change considerations into the implementation of EU water policy is currently discussed with a wide range of experts and stakeholders at EU level. Research trends are also on-going, striving to support policy developments and examining how scientific findings and recommendations could be best taken on board by policy-makers and water managers within the forthcoming years. This paper provides a snapshot of policy discussions about climate change in the context of the WFD river basin management planning and specific advancements of related EU-funded research projects. Perspectives for strengthening links among the scientific and policy-making communities in this area are also highlighted. Copyright © 2012 Elsevier B.V. All rights reserved.

  2. Timely confirmation of gastro-esophageal reflux disease via pH monitoring: estimating budget impact on managed care organizations.

    PubMed

    Lee, W C; Yeh, Y C; Lacy, B E; Pandolfino, J E; Brill, J V; Weinstein, M L; Carlson, A M; Williams, M J; Wittek, M R; Pashos, C L

    2008-05-01

    Current guidelines recommend the use of pH monitoring to confirm the diagnosis of acid reflux in patients with a normal endoscopy. This analysis evaluated the financial impact of pH monitoring with the wireless pH capsule on a managed care organization (MCO) in the United States. A decision model was constructed to project total 1-year costs to manage GERD symptoms with and without the adoption of wireless pH capsules in a hypothetical MCO with 10 000 eligible adult enrollees, of whom 600 presented with GERD-like symptoms. Costs of GERD diagnosis, treatment, and symptom management for those in whom a GERD diagnosis was ruled out by pH monitoring were assessed. The incremental per-member-per-month (PMPM) and per-treated-member-per-month (PTMPM) costs were the primary outcomes. Data sources included literature, expert input, and standardized fee schedules. An increase of 10 percentage points in the use of pH monitoring with wireless pH capsules yielded incremental PMPM and PTMPM costs of $0.029 and $0.481, respectively. The costs of proton pump inhibitor (PPI) therapy to the plan dropped to $236,363 from $238,086, while increases were observed in pH monitoring (from $16 739 to $21 973) and non-GERD therapy costs (from $1392 to $1740). The results were sensitive to the percentage of patients requiring repeat endoscopy before wireless pH monitoring and the cost of PPIs. Timely and increased use of pH monitoring as recommended in published guidelines leads to less unnecessary use of PPIs with a modest budgetary impact on health plans.

  3. Public participation and marginalized groups: the community development model.

    PubMed

    O'Keefe, Eileen; Hogg, Christine

    1999-12-01

    OBJECTIVES: To develop ways of reaching house-bound people and enabling them to give their views in planning and monitoring health and social care. STRATEGY: HealthLINK - a project based in a community health council - explored ways of involving older house-bound people in the London Borough of Camden, in planning and monitoring health and social care using community development techniques. RESULTS: HealthLINK set up an infrastructure to enable house-bound people to have access to information and to enable them to give their views. This resulted in access for health and local authorities to the views of house-bound older people and increased the self esteem and quality of life of those who became involved. CONCLUSIONS: Community development approaches that enable an infrastructure to be established may be an effective way of reaching marginalized communities. However, there are tensions in this approach between the different requirements for public involvement of statutory bodies and of users, and between representation of groups and listening to individual voices.

  4. Subsidence monitoring network: an Italian example aimed at a sustainable hydrocarbon E&P activity

    NASA Astrophysics Data System (ADS)

    Dacome, M. C.; Miandro, R.; Vettorel, M.; Roncari, G.

    2015-11-01

    According to the Italian law in order to start-up any new hydrocarbon exploitation activity, an Environmental Impact Assessment study has to be presented, including a monitoring plan, addressed to foresee, measure and analyze in real time any possible impact of the project on the coastal areas and on those ones in the close inland located. The occurrence of subsidence, that could partly be related to hydrocarbon production, both on-shore and off-shore, can generate great concern in those areas where its occurrence may have impacts on the local environment. ENI, following the international scientific community recommendations on the matter, since the beginning of 90's years, implemented a cutting-edge monitoring network, with the aim to prevent, mitigate and control geodynamics phenomena generated in the activity areas, with a particular attention to conservation and protection of environmental and territorial equilibrium, taking care of what is known as "sustainable development". The current ENI implemented monitoring surveys can be divided as: - Shallow monitoring: spirit levelling surveys, continuous GPS surveys in permanent stations, SAR surveys, assestimeter subsurface compaction monitoring, ground water level monitoring, LiDAR surveys, bathymetrical surveys. - Deep monitoring: reservoir deep compaction trough radioactive markers, reservoir static (bottom hole) pressure monitoring. All the information, gathered through the monitoring network, allow: 1. to verify if the produced subsidence is evolving accordingly with the simulated forecast. 2. to provide data to revise and adjust the prediction compaction models 3. to put in place the remedial actions if the impact exceeds the threshold magnitude originally agreed among the involved parties. ENI monitoring plan to measure and monitor the subsidence process, during field production and also after the field closure, is therefore intended to support a sustainable field development and an acceptable exploitation programme in which the actual risk connected with the field production is evaluated in advance, shared and agreed among all the involved subjects: oil company, stakeholders and local community (with interests in the affected area).

  5. Saltwater intrusion in the surficial aquifer system of the Big Cypress Basin, southwest Florida, and a proposed plan for improved salinity monitoring

    USGS Publications Warehouse

    Prinos, Scott T.

    2013-01-01

    The installation of drainage canals, poorly cased wells, and water-supply withdrawals have led to saltwater intrusion in the primary water-use aquifers in southwest Florida. Increasing population and water use have exacerbated this problem. Installation of water-control structures, well-plugging projects, and regulation of water use have slowed saltwater intrusion, but the chloride concentration of samples from some of the monitoring wells in this area indicates that saltwater intrusion continues to occur. In addition, rising sea level could increase the rate and extent of saltwater intrusion. The existing saltwater intrusion monitoring network was examined and found to lack the necessary organization, spatial distribution, and design to properly evaluate saltwater intrusion. The most recent hydrogeologic framework of southwest Florida indicates that some wells may be open to multiple aquifers or have an incorrect aquifer designation. Some of the sampling methods being used could result in poor-quality data. Some older wells are badly corroded, obstructed, or damaged and may not yield useable samples. Saltwater in some of the canals is in close proximity to coastal well fields. In some instances, saltwater occasionally occurs upstream from coastal salinity control structures. These factors lead to an incomplete understanding of the extent and threat of saltwater intrusion in southwest Florida. A proposed plan to improve the saltwater intrusion monitoring network in the South Florida Water Management District’s Big Cypress Basin describes improvements in (1) network management, (2) quality assurance, (3) documentation, (4) training, and (5) data accessibility. The plan describes improvements to hydrostratigraphic and geospatial network coverage that can be accomplished using additional monitoring, surface geophysical surveys, and borehole geophysical logging. Sampling methods and improvements to monitoring well design are described in detail. Geochemical analyses that provide insights concerning the sources of saltwater in the aquifers are described. The requirement to abandon inactive wells is discussed.

  6. Women, water supply and sanitation: INSTRAW's training initiatives.

    PubMed

    Tavares, J

    1997-01-01

    The International Research and Training Institute for the Advancement of Women (INSTRAW) has worked on women, water supply and sanitation since 1986. The program aims to establish the relationship between women, water supply and sanitation and the promotion of the needs of women and their participation in Water Supply and Sanitation projects. Using a multimedia and modular approach, the training package on Women, Water Supply and Sanitation aims to provide an overview for the different government agencies, engineers, trainers and managers involved in water supply and sanitation projects. The six modules contained in this package include: 1) The International Drinking Water Supply and Sanitation Decade and beyond; 2) The Participation of Women in planning, Choice of Technology and Implementation of Sustainable Water Supply and Sanitation Projects; 3) Role of Women in Hygiene Education and Training Activities for Water Supply and Sanitation Projects; 4) Involvement of Women in Management of Water resources, Water Supply and Waste Disposal; 5) Women and Waste Management; and 6) Evaluation and Monitoring of Water Supply and Sanitation Programs, Projects and the Role of Women. In addition, each module comprises five components including objective description, detailed bibliography, feedback tools for each modular unit, lesson plan and guides for trainers and users, and audiovisual aids. In the face of water scarcity, INSTRAW highlights the importance of women¿s participation in the sustainable use of water supply.

  7. DOE-OTM Tribology Program semiannual progress report, October 1992--March 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The OTM Tribology Program supports applied research and exploratory development which private enterprise will not or cannot pursue, in specifically identified industrial problem areas pertaining to energy conservation in the transportation sector. Under the current Annual Operating Plan (AOP) the tribology project is structured to conform with the ongoing and planned research activities in three program elements: (1) advanced lubrication--experimental investigations of lubrication phenomena and the development of improved or novel lubricants and lubricant-delivery systems for current and advanced engine systems; (2) engineered tribological interfaces--research and development on various coating processes to modify the microstructure and chemical composition of near-surfacemore » regions in order to improve their friction and wear properties for use in advanced engine designs; (3) advanced tribomaterials and components--tribomaterials evaluation of the friction and wear behavior of newly emerging materials, particularly those promising low friction and wealth at elevated temperatures in advanced engine designs: and tribocomponents evaluation which focuses on development of models, analysis/design tools to enable US transportation industry to employ a tribology-by-design approach and dissemination of program developments to the US transportation industry. Project Management encompasses the administrative and managerial duties of planning, including assessments of application areas with significant tribological energy losses and opportunities for tribological advances in the transportation sector; program implementation, including the review of proposals, organization and conduct of RFP and/or ROA solicitations, selection of R and D projects; and the issues of contracts grants and purchase orders; monitoring of project activities: reporting, information exchange and technology transfer. The current organization of the tribology project, the lead responsibilities for each program element and the present contractors are shown in Table 1. Brief summaries of progress made in this are included.« less

  8. Bangladesh mission sees great benefits.

    PubMed

    1998-10-01

    A JOICFP 2-member mission visited Bangladesh during August 9-22 to monitor the progress of cooperative projects in Narsingdhi and Feni districts, implemented by the Family Planning Association of Bangladesh (FPAB), and to discuss the implementation of Postal Savings for International Voluntary Aid (POSIVA) funds. POSIVA is in its 4th year of providing funds to Bangladesh. The Population Reference Bureau's (PRB) Japan Representative joined the mission on a study tour during August 9-17 to directly observe reproductive health and family planning, women's empowerment, and micro-credit at the grassroots level. The representative hopes to raise the Japanese public's awareness of international nongovernmental organization (NGO) partnerships in order to encourage them to help rural populations in developing countries. The offices of the Ministry of Health and Family Welfare, the International Secretariat of Partners in Population and Development, UNFPA, Population Council, OECF, the Japan International Cooperation Agency (JICA), and the Grammin Bank were visited, as well as the project areas of Panchdona and Dhalia Unions of the Integrated Family Development Project. ODA assistance should be strengthened to improve grassroots activities, with a focus upon women's empowerment, maternal and child health, and alleviating poverty through NGOs working together with communities. A project to build capacity in reproductive health in Jessore District is described.

  9. INSTALLATION OF A POST-ACCIDENT CONFINEMENT HIGH-LEVEL RADIATION MONITORING SYSTEM IN THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GREENE,G.A.; GUPPY,J.G.

    1998-09-01

    This is the final report on the INSP project entitled, ``Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install andmore » make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant.« less

  10. An evaluation of the role of email in promoting science investigative skills in primary rural schools in England

    NASA Astrophysics Data System (ADS)

    Jarvis, Tina; Hargreaves, Linda; Comber, Chris

    1997-06-01

    This project evaluated the effect of collaboration via email links on the quality of 10-11 year old students’ science investigative skills in six primary rural schools. After a joint planning meeting, sixty children collected, identified and shared information via email about moths in their area, in order to produce a joint booklet. All email traffic was monitored throughout the project. Indepth structured observations and interviews were carried out at the schools. Children completed daily diaries. The children demonstrated a variety of science skills, particularly observation and recording. Their competence and confidence in using computers, handling email and in manipulating a data base developed during the project. The project identified a number of important issues relating to teacher inservice training requirements, the importance of a suitable progression of IT experiences throughout the school, development in cooperative groupwork for children, and software design.

  11. Key challenges in the development and implementation of telehealth projects.

    PubMed

    Joseph, Victor; West, Robert M; Shickle, Darren; Keen, Justin; Clamp, Susan

    2011-01-01

    A literature review was carried out to identify the key challenges in the implementation of telehealth. This was followed by a survey of organisations in England involved in telehealth projects in order to understand the challenges they faced. Ten of the 13 health or local authority organisations surveyed had telehealth projects and three were at the planning stage. The analysis revealed seven key challenges facing implementers of telehealth in England. Based on the findings from the literature review and the survey, a model was constructed and a checklist drawn up. The model contained the following elements: identifying issues, needs and partners; producing a strategy; securing funding; implementing changes; and monitoring and evaluating a telehealth project. The checklist was validated by using key informants from the organisations originally surveyed. The checklist may be useful to guide telehealth development and implementation in the future.

  12. The planning of a passive seismic experiment: the Ketzin case

    NASA Astrophysics Data System (ADS)

    Rossi, G.; Petronio, L.

    2009-04-01

    In the last years, it has been recognized the importance of using microseismic activity data to gain information on the state and dynamics of a reservoir, notwithstanding the difficulties of recording, localizing the events, interpret them correctly, in terms of developing fractures, or thermal effects. The increasing number of CO2 storage experiments, with the necessity of providing efficient, economic, and long-term monitoring methods, both in the injection and post-injection phases, further encourage the development and improvement of recording and processing techniques. Microseismic signals are typically recorded with downhole sensors. Monitoring with surface sensors is problematic due to increased noise levels and signal attenuation particularly in the near surface. The actual detection distance depends on background noise conditions, seismic attenuation and the microseismic source strength. In the frame of the European project Co2ReMoVe and of the European Network of Excellence Co2GeoNet, a passive seismic experiment was planned in the Ketzin site for geological storage of CO2, a former gas store near Potsdam, object of the CO2SINK European project and inserted also in the European project Co2ReMoVe. Aim of the survey is to complement the CO2-SINK active seismic downhole experiments, adding precious information on the microseismicity induced by stress field changes at the reservoir level and in the overburden, due to the CO2 injection. The baseline survey was done in May 2008 by the Istituto Nazionale di Oceanografia e di Geofisica Sperimentale-OGS (Italy), with the support of the Deutsches GeoForschungsZentrum-GFZ (Germany) and the collaboration of the Institut für Geowissenschaftliche Gemeinschaftsaufgaben-GGA (Germany), shortly before the starting of the CO2 injection (June 30th 2008). A continuous monitoring (about 5 days) was performed by 2 downhole 3C geophones, and 3 surface 3C geophones located around the wells. This paper, based on the analysis of the baseline data, is focused on the design and planning of the next seismic passive surveys, optimizing the recording geometry and instrumentation, to record the microseismic events that could be induced by the redistribution of the stresses following the injection, and help the understanding of the injected CO2 behaviour.

  13. Strengthening Government Leadership in Family Planning Programming in Senegal: From Proof of Concept to Proof of Implementation in 2 Districts.

    PubMed

    Aichatou, Barry; Seck, Cheikh; Baal Anne, Thierno Souleymane; Deguenovo, Gabrielle Clémentine; Ntabona, Alexis; Simmons, Ruth

    2016-12-23

    Given Senegal's limited resources, the country receives substantial support from externally funded partner organizations to provide family planning and maternal and child health services. These organizations often take a strong and sometimes independent role in implementing interventions with their own structures and personnel, thereby bypassing the government district health system. This article presents findings from the Initiative Sénégalaise de Santé Urbaine (ISSU) (Senegal Urban Health Initiative) that assessed in 2 districts, Diamniadio and Rufisque, the extent to which it was feasible to create stronger government ownership and leadership in implementing a simplified package of family planning interventions from among those previously tested in other districts. The simplified package consisted of both supply- and demand-side interventions, introduced in October 2014 and concluding at the end of 2015. The interventions included ensuring adequate human resources and contraceptive supplies, contraceptive technology updates for providers, special free family planning service days to bring services closer to where people live, family planning integration into other routine services, household visits for family planning education, religious sermons to clarify Islam's position on family planning, and radio broadcasts. District leadership in Diamniadio and Rufisque were actively involved in guiding and implementing interventions, and they also contributed some of their own resources to the project. However, reliance on external funding continued because district budgets were extremely limited. Monitoring data on the number of contraceptive methods provided by district facilities supported by a sister project, the Informed Push Model project, indicate overall improvement in contraceptive provision during the intervention period. In Diamniadio, contraceptive provision increased by 43% between the 6-month period prior to the ISSU interventions (November 2013 through April 2014) and a 6-month intervention period (November 2014 through April 2015), from about 8,000 units to nearly 12,000 units. In Rufisque, contraceptive provision increased by 30%, from more than 17,000 units to more than 22,000 units. Couple-years of protection provided in Diamniadio increased by 82% and in Rufisque by 56%. The experience in these 2 districts in Senegal suggests that it is feasible for districts to play a leadership role in implementing family planning services and mobilizing some of their own resources and that international projects can facilitate capacity building and sustainability within public-sector systems. © Aichatou et al.

  14. Strengthening Government Leadership in Family Planning Programming in Senegal: From Proof of Concept to Proof of Implementation in 2 Districts

    PubMed Central

    Aichatou, Barry; Seck, Cheikh; Baal Anne, Thierno Souleymane; Deguenovo, Gabrielle Clémentine; Ntabona, Alexis; Simmons, Ruth

    2016-01-01

    ABSTRACT Given Senegal's limited resources, the country receives substantial support from externally funded partner organizations to provide family planning and maternal and child health services. These organizations often take a strong and sometimes independent role in implementing interventions with their own structures and personnel, thereby bypassing the government district health system. This article presents findings from the Initiative Sénégalaise de Santé Urbaine (ISSU) (Senegal Urban Health Initiative) that assessed in 2 districts, Diamniadio and Rufisque, the extent to which it was feasible to create stronger government ownership and leadership in implementing a simplified package of family planning interventions from among those previously tested in other districts. The simplified package consisted of both supply- and demand-side interventions, introduced in October 2014 and concluding at the end of 2015. The interventions included ensuring adequate human resources and contraceptive supplies, contraceptive technology updates for providers, special free family planning service days to bring services closer to where people live, family planning integration into other routine services, household visits for family planning education, religious sermons to clarify Islam's position on family planning, and radio broadcasts. District leadership in Diamniadio and Rufisque were actively involved in guiding and implementing interventions, and they also contributed some of their own resources to the project. However, reliance on external funding continued because district budgets were extremely limited. Monitoring data on the number of contraceptive methods provided by district facilities supported by a sister project, the Informed Push Model project, indicate overall improvement in contraceptive provision during the intervention period. In Diamniadio, contraceptive provision increased by 43% between the 6-month period prior to the ISSU interventions (November 2013 through April 2014) and a 6-month intervention period (November 2014 through April 2015), from about 8,000 units to nearly 12,000 units. In Rufisque, contraceptive provision increased by 30%, from more than 17,000 units to more than 22,000 units. Couple-years of protection provided in Diamniadio increased by 82% and in Rufisque by 56%. The experience in these 2 districts in Senegal suggests that it is feasible for districts to play a leadership role in implementing family planning services and mobilizing some of their own resources and that international projects can facilitate capacity building and sustainability within public-sector systems. PMID:28031298

  15. Remune trial will stop; new trials planned.

    PubMed

    James, J S

    1999-05-21

    A clinical trial using remune, the anti-HIV vaccine developed by the late Dr. Jonas Salk, has been ended. The study is a clinical-endpoint trial which looks for statistically significant differences in AIDS sickness or death between patients who add remune to their treatment regimens versus those who use a placebo. Agouron Pharmaceuticals and the Immune Response Corporation who were conducting the trial announced their decision to stop it after an analysis by the Data Safety Monitoring Board. No differences in clinical endpoints were found and it was projected that continuing the trial would likely not find any. The companies are now planning two new Phase III trials using viral load testing rather than clinical endpoints as study criteria.

  16. Integration of Satellite, Modeled, and Ground Based Aerosol Data for use in Air Quality and Public Health Applications

    NASA Astrophysics Data System (ADS)

    Garcia, V.; Kondragunta, S.; Holland, D.; Dimmick, F.; Boothe, V.; Szykman, J.; Chu, A.; Kittaka, C.; Al-Saadi, J.; Engel-Cox, J.; Hoff, R.; Wayland, R.; Rao, S.; Remer, L.

    2006-05-01

    Advancements in remote sensing over the past decade have been recognized by governments around the world and led to the development of the international Global Earth Observation System of Systems 10-Year Implementation Plan. The plan for the U.S. contribution to GEOSS has been put forth in The Strategic Plan for the U.S. Integrated Earth Observation System (IEOS) developed under IWGEO-CENR. The approach for the development of the U.S. IEOS is to focus on specific societal benefits that can be achieved by integrating the nation's Earth observation capabilities. One such challenge is our ability to understand the impact of poor air quality on human health and well being. Historically, the air monitoring networks put in place for the Nations air quality programs provided the only aerosol air quality data on an ongoing and systematic basis at national levels. However, scientific advances in the remote sensing of aerosols from space have improved dramatically. The MODIS sensor and GOES Imager aboard NASA and NOAA satellites, respectively, provide synoptic-scale measurements of aerosol optical depth (AOD) which have been demonstrated to correlate with high levels of PM10 and PM2.5 at the surface. The MODIS sensor has been shown to be capable of a 1 km x 1 km (at nadir) AOD product, while the GOES Imager can provide AOD at 4 km x 4 km every 30 minutes. Within the next several years NOAA and EPA will begin to issue PM2.5 air quality forecasts over the entire domain of the eastern United States, eventually extending to national coverage. These forecasts will provide continuous estimated values of PM2.5 on a daily basis. A multi-agency collaborative project among government and academia is underway to improve the spatial prediction of fine particulate matter through the integration of multi-sensor and multi-platform aerosol observations (MODIS and GOES), numerical model output, and air monitoring data. By giving more weight to monitoring data in monitored areas and relying on adjusted model output and satellite data in non-monitored areas, a Bayesian hierarchical space-time model will be used to improve the accuracy of prediction and associated prediction errors. The improved spatial predictions will be tested as estimates of exposure for input to modeling relationships between air quality and asthma/other respiratory diseases through CDC under the Environmental Public Health Tracking Network. We will also focus on the use of the predictive spatial maps within the EPA AIRNow program which provides near real-time spatial maps of daily average PM2.5 concentrations across the US. We will present the overall project plan and preliminary results with emphasis on how GEOSS framework is facilitating this effort.

  17. U.S. Geological Survey science for the Wyoming Landscape Conservation Initiative—2016 annual report

    USGS Publications Warehouse

    Bowen, Zachary H.; Aikens, Ellen; Aldridge, Cameron L.; Anderson, Patrick J.; Assal, Timothy J.; Chalfoun, Anna D.; Chong, Geneva W.; Eddy-Miller, Cheryl; Garman, Steven L.; Germaine, Stephen S.; Homer, Collin G.; Johnston, Aaron; Kauffman, Matthew J.; Manier, Daniel J.; Melcher, Cynthia P.; Miller, Kirk A.; Walters, Annika W.; Wheeler, Jerrod D.; Wieferich, Daniel; Wilson, Anna B.; Wyckoff, Teal B.; Zeigenfuss, Linda C.

    2018-05-10

    This is the ninth annual report highlighting U.S. Geological Survey (USGS) science and decision-support activities conducted for the Wyoming Landscape Conservation Initiative (WLCI). The activities address specific management needs identified by WLCI partner agencies. In fiscal year (FY) 2016, there were 26 active USGS WLCI science-based projects. Of these 26 projects, one project was new for FY2016, and three were completed by the end of the fiscal year (though final products were still in preparation or review). USGS WLCI projects were grouped under five categories: (1) Baseline Synthesis, (2) Long-Term Monitoring, (3) Effectiveness Monitoring, (4) Mechanistic Studies of Wildlife, and (5) Data and Information Management. Each of these topic areas is designed to address WLCI management needs: identifying key drivers of change, identifying the condition and distribution of key wildlife species and habitats and of species’ habitat requirements, development of an integrated inventory and monitoring strategy, use of emerging technologies and development and testing of innovative methods for maximizing the efficiency and efficacy of monitoring efforts, evaluating the effectiveness of habitat treatment projects, evaluating the responses of wildlife to development, and developing a data clearinghouse and information management framework to support and provide access to results of most USGS WLCI projects.In FY2016, we assisted with updating the WLCI Conservation Action Plan and associated databases as part of the Comprehensive Assessment, and we also assisted with the Bureau of Land Management 2015 WLCI annual report. By the end of FY2016, we completed or had nearly completed assessments of WLCI energy and mineral resources and had submitted a manuscript on modeled effects of oil and gas development on wildlife to a peer-reviewed journal. We also initiated a study on the effects of wind energy on wildlife in the WLCI region. A USGS circular on WLCI long-term monitoring was in review at the end of the fiscal year, and seven projects monitoring water and vegetation (including changes in sagebrush cover and patterns of sagebrush mortality) continued through the year. USGS scientists continued many projects in FY2016 that evaluate the effectiveness of habitat conservation actions (including sagebrush, cheatgrass, and aspen habitat treatments) and provide tools in support of mechanistic studies of wildlife. In FY2016, USGS scientists, along with university and State partners, continued work on five focal wildlife species/communities (pygmy rabbits [Brachylagus idahoensis], greater sage grouse , mule deer, sagebrush songbirds, and native fish). In FY2016, the USGS Information Management Team presented information to WLCI scientists on how USGS tools and resources can be used to fulfill the requirements of new USGS policies regarding data release, data management, and data visualization.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies themore » close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M&O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [``Program`` refers to the CRWMS-wide activity and ``project`` refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project.« less

  19. Family Health Services project: the way forward.

    PubMed

    Dabiri, O M

    1993-01-01

    Nigerians did not readily accept family planning when Family Health Services (FHS) began in 1988. FHS has made much headway in training, IEC (information, education, and communication), and constituency building and advocacy. Its staff have identified obstacles to implementation, especially program sustainability and management structure. Key limits to sustainability of IEC efforts were inadequately trained personnel and inability of trained personnel to apply what they learned at work stations. The Federal Ministry and Social Services' role in the FHS project was not clearly defined. Some private sector factors contributing to a confused management structure were inadequate method mix, high contraceptive cost, poor monitoring of quality of care, and no coordination of family planning training with the public factor. FHS has since decided to focus its efforts on increasing the demand for and availability of modern contraceptives and improving the quality of family planning services of both the public and private sectors. FHS hopes that accomplishing these activities will reduce fertility, morbidity, and mortality. Strategic plans include a regional focus, quality of care, a variety of methods offered, intensification, hospital and clinics, a management information system, contraceptive logistics, distribution regulations, and addressing social, cultural, and behavioral factors. To effectively implement the strategy, USAID and the Federal Ministry held a workshop in 1993 to effect full integration of Nigerian experience in the 2nd phase of the project (FHS II). Participants reviewed the strengths and weaknesses of the first phase and agreed on implementation. For example, nongovernmental organizations should implement FHS II. FHS II includes training, IEC, and commodities/logistics.

  20. An effectiveness monitoring program for the northwest forest plan: new approaches to common monitoring problems

    Treesearch

    Craig Palmer; Barry Mulder; Barry Noon

    2000-01-01

    The Northwest Forest Plan is a large-scale ecosystem management plan for federal lands in the Pacific Northwest of the United States. An effectiveness monitoring program has been developed to determine the extent to which the goals and objectives of this Plan are being achieved. Priority resources identified for ecological monitoring include late-successional and old-...

  1. Effects of Piezoelectric (PZT) Sensor Bonding and the Characteristics of the Host Structure on Impedance Based Structural Health Monitoring

    NASA Technical Reports Server (NTRS)

    Jalloh, Abdul

    2005-01-01

    This study was conducted to investigate the effects of certain factors on the impedance signal in structural health monitoring. These factors were: the quality of the bond between the sensor and the host structure, and the characteristics of the host structure, such as geometry, mass, and material properties. This work was carried out to answer a set of questions, related to these factors, that were developed by the project team. The project team was comprised of Dr. Doug Ramers and Dr. Abdul Jalloh of the Summer Faculty Fellowship Program, Mr. Arnaldo Colon- Perez, a student intern from the University of Puerto Rico of Turabo, and Mr. John Lassiter and Mr. Bob Engberg of the Structural and Dynamics Test Group at NASA Marshall Space Flight Center (MSFC). This study was based on a review of the literature on structural health monitoring to investigate the factors referred to above because there was not enough time to plan and conduct the appropriate tests at MSFC during the tenure of the Summer Faculty Fellowship Program project members. The surveyed literature documents works on structural health monitoring that were based on laboratory tests that were conducted using bolted trusses and other civil engineering type structures for the most part. These are not the typical types of structures used in designing and building NASA s space vehicles and systems. It was therefore recommended that tests be conducted using NASA type structures, such as pressure vessels, to validate the observations made in this report.

  2. Archeological Monitoring Plan for Four Floodwall Projects in the City of New Orleans.

    DTIC Science & Technology

    1985-05-29

    DISTRIBUTION STATEMENT (of the abstract entered In Block 20. It different from Report) III. SUPPLEMENTARY NOTES Is. KEY WORDS (C.utnu. an ,evere adds, t n...ceeGAa end Idemti by block nmbr) Archeology History New Orleans Sugar Commerce Industry Nineteenth Century Cotton Land use Port of New Orleans...Demography Mississippi River Railroads Eighteenth Century National Register Settlement Patterns 20L ANTUAC?’ (Cawtham em v.wuw eb N ainerm tdatfp by block

  3. Developing a Repeatable Methodology to Calculate Retrograde Planning Factors

    DTIC Science & Technology

    2015-01-01

    CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING...ORGANIZATION NAME( S ) AND ADDRESS(ES) RAND Corporation,Arroyo Center,1776 Main Street, P.O. Box 2138,Santa Monica,CA,90407-2138 8. PERFORMING...ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM( S ) 11. SPONSOR/MONITOR’S REPORT NUMBER( S

  4. Generation of data acquisition requests for the ASTER satellite instrument for monitoring a globally distributed target: glaciers

    USGS Publications Warehouse

    Raup, B.H.; Kieffer, H.H.; Hare, T.M.; Kargel, J.S.

    2000-01-01

    The advanced spaceborne thermal emission and reflection radiometer (ASTER) instrument is scheduled to be launched on the EOS Terra platform in 1999. The Global Land Ice Measurements from Space project has planned to acquire ASTER images of most of the world's land ice annually during the six-year ASTER mission. This article describes the process of creating the data acquisition requests needed to cover approximately 170,000 glacier targets.

  5. Environmental monitoring plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holland, R.C.

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

  6. Tribal Wind Assessment by the Eastern Shoshone Tribe of the Wind River Reservation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pete, Belvin; Perry, Jeremy W.; Stump, Raphaella Q.

    2009-08-28

    The Tribes, through its consultant and advisor, Distributed Generation Systems (Disgen) -Native American Program and Resources Division, of Lakewood CO, assessed and qualified, from a resource and economic perspective, a wind energy generation facility on tribal lands. The goal of this feasibility project is to provide wind monitoring and to engage in preproject planning activities designed to provide a preliminary evaluation of the technical, economic, social and environmental feasibility of developing a sustainable, integrated wind energy plan for the Eastern Shoshone and the Northern Arapahoe Tribes, who resides on the Wind River Indian Reservation. The specific deliverables of the feasibilitymore » study are: 1) Assessments of the wind resources on the Wind River Indian Reservation 2) Assessments of the potential environmental impacts of renewable development 3) Assessments of the transmission capacity and capability of a renewable energy project 4) Established an economic models for tribal considerations 5) Define economic, cultural and societal impacts on the Tribe« less

  7. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  8. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  9. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  10. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  11. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  12. NASA Ames Research Center 60 MW Power Supply Modernization

    NASA Technical Reports Server (NTRS)

    Choy, Yuen Ching; Ilinets, Boris V.; Miller, Ted; Nagel, Kirsten (Technical Monitor)

    2001-01-01

    The NASA Ames Research Center 60 MW DC Power Supply was built in 1974 to provide controlled DC power for the Thermophysics Facility Arc Jet Laboratory. The Power Supply has gradually losing reliability due to outdated technology and component life limitation. NASA has decided to upgrade the existing rectifier modules with contemporary high-power electronics and control equipment. NASA plans to complete this project in 2001. This project includes a complete replacement of obsolete thyristor stacks in all six rectifier modules and rectifier bridge control system. High power water-cooled thyristors and freewheeling diodes will be used. The rating of each of the six modules will be 4000 A at 5500 V. The control firing angle signal will be sent from the Facility Control System to six modules via fiberoptic cable. The Power Supply control and monitoring system will include a Master PLC in the Facility building and a Slave PLC in each rectifier module. This system will also monitor each thyristor level in each stack and the auxiliary equipment.

  13. Remote and terrestrial ground monitoring techniques integration for hazard assessment in mountain areas

    NASA Astrophysics Data System (ADS)

    Chinellato, Giulia; Kenner, Robert; Iasio, Christian; Mair, Volkmar; Mosna, David; Mulas, Marco; Phillips, Marcia; Strada, Claudia; Zischg, Andreas

    2014-05-01

    In high mountain regions the choice of appropriate sites for infrastructure such as roads, railways, cable cars or hydropower dams is often very limited. In parallel, the increasing demand for supply infrastructure in the Alps induces a continuous transformation of the territory. The new role played by the precautionary monitoring in the risk governance becomes fundamental and may overcome the modeling of future events, which represented so far the predominant approach to these sort of issues. Furthermore the consequence of considering methodologies alternative to those more exclusive allow to reduce costs and increasing the frequency of measurements, updating continuously the cognitive framework of existing hazard condition in most susceptible territories. The scale factor of the observed area and the multiple purpose of such regional ordinary surveys make it convenient to adopt Radar Satellite-based systems, but they need to be integrated with terrestrial systems for validation and eventual early warning purposes. Significant progress over the past decade in Remote Sensing (RS), Proximal Sensing and integration-based sensor networks systems now provide technologies, that allow to implement monitoring systems for ordinary surveys of extensive areas or regions, which are affected by active natural processes and slope instability. The Interreg project SloMove aims to provide solutions for such challenges and focuses on using remote sensing monitoring techniques for the monitoring of mass movements in two test sites, in South Tyrol (Italy) and in Grisons Canton (Switzerland). The topics faced in this project concern mass movements and slope deformation monitoring techniques, focusing mainly on the integration of multi-temporal interferometry, new generation of terrestrial technologies for differential digital terrain model elaboration provided by laser scanner (TLS), and GNSS-based topographic surveys, which are used not only for validation purpose, but also for adding value and information to the whole monitoring survey. The test sites are currently observed by an original integrated methodology specifically developed within the aim of the project. The integrated monitoring design includes reference targets for the different monitoring systems placed together on the same point or rigid foundation, to facilitate the comparison of the data and, in the operational use, to be able to switch consistently from one to the other system. The principal goal of the project is to define a shared procedure to select scalable technologies, best practices and institutional action plans more adequate to deal with different sort of hazard related to ground displacement, in densely populated mountain areas containing recreational and critical infrastructures. Keywords: integrated monitoring, multi-temporal interferometry, artificial reflectors; mass movement, SloMove.eu

  14. Use of the ecosystem services concept in landscape management in the Netherlands.

    PubMed

    van Wensem, Joke

    2013-04-01

    Increasing reference to the ecosystem services (ES) concept is made in publications on the need to use natural resources sustainably, to protect and enhance biodiversity, and to alleviate poverty in developing countries. To examine the significance of the concept in densely populated industrialized countries, this case study investigates its use in several sustainable landscape management projects in the Netherlands. Guidance by the Economics of Ecosystems and Biodiversity project (TEEB) for local and regional policy and management serves as a reference. The projects studied show that the ES concept is seen as a tool for enhancing biodiversity, creating more sustainable regional development plans, supporting better spatial-planning decisions on soil sealing, and, most importantly, for getting the involvement of much broader stakeholder groups--not just to make better decisions, but also to attract more funding for the plans. Not only does the Netherlands have a high demand for various ecosystem services and a desire for multifunctional land use, it also has a long tradition of consensus-seeking. As a result, "Dutch practice" is complex and involves many different stakeholders. Because of increasing recognition of the role ecosystem services play in enhancing the visibility of natural resources in decision making, the ES concept seems to be gaining a foothold. However, the number of projects is still limited, and neither the use of the methods nor the results are monitored. So far, this has made it impossible to say whether the approach leads to more sustainable decisions-in other words, to the better protection and management of natural resources. Copyright © 2013 SETAC.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    When the facilities design and construction team at the University of California, San Diego (UCSD) started planning to upgrade and expand their control system, they had several critical goals for the project. They wanted a building automation system (BAS) that could achieve optimum energy savings while maximizing the efficiency of the facilities staff. They needed the new system to link 26 campus buildings--containing a variety of existing systems--to one central location for monitoring and diagnostics. They wanted a single vendor to handle installation, software development, service and support--and they wanted the entire project completed without downtime. At the core ofmore » these technologies is the Metasys{reg_sign} facility management system from Johnson Controls.« less

  16. Quality Assurance Project Plan for Citizen Science Projects

    EPA Pesticide Factsheets

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  17. Challenges associated with tracking resources allocation for reproductive health in sub-Saharan African countries: the UNFPA/NIDI resource flows project experience.

    PubMed

    Sidze, Estelle M; Beekink, Erik; Maina, Beatrice W

    2015-05-05

    Universal access to reproductive health services entails strengthening health systems, but requires significant resource commitments as well as efficient and effective use of those resources. A number of international organizations and governments in developing countries are putting efforts into tracking the flow of health resources in order to inform resource mobilization and allocation, strategic planning, priority setting, advocacy and general policy making. The UNFPA/NIDI-led Resource Flows Project ("The UNFPA/NIDI RF Project") has conducted annual surveys since 1997 to monitor progress achieved by developing countries in implementing reproductive health financial targets. This commentary summarizes the Project experiences and challenges in gathering data on allocation of resources for reproductive health at the domestic level in sub-Saharan African countries. One key lesson learnt from the Project experience is the need for strengthening tracking mechanisms in sub-Saharan African countries and making information on reproductive health resources and expenditures available, in particular the private sector resources.

  18. Integrating Climate Change into Great Lakes Protection

    NASA Astrophysics Data System (ADS)

    Hedman, S.

    2012-12-01

    Climate change is now recognized as one of the greatest threats to the Great Lakes. Projected climate change impacts to the Great Lakes include increases in surface water and air temperature; decreases in ice cover; shorter winters, early spring, and longer summers; increased frequency of intense storms; more precipitation falling as rain in the winter; less snowfall; and variations in water levels, among other effects. Changing climate conditions may compromise efforts to protect and restore the Great Lakes ecosystem and may lead to irrevocable impacts on the physical, chemical, and biological integrity of the Great Lakes. Examples of such potential impacts include the transformation of coastal wetlands into terrestrial ecosystems; reduced fisheries; increased beach erosion; change in forest species composition as species migrate northward; potential increase in toxic substance concentrations; potential increases in the frequency and extent of algal blooms; degraded water quality; and a potential increase in invasive species. The Great Lakes Restoration Initiative, signed into law by President Obama in 2010, represents the commitment of the federal government to protect, restore, and maintain the Great Lakes ecosystem. The GLRI Action Plan, issued in February 2010, identifies five focus areas: - Toxic Substances and Areas of Concern - Invasive Species - Nearshore Health and Nonpoint Source Pollution - Habitat and Wildlife Protection and Restoration - Accountability, Education, Monitoring, Evaluation, Communication, and Partnerships The Action Plan recognizes that the projected impacts of climate change on the Great Lakes have implications across all focus areas and encourages incorporation of climate change considerations into GLRI projects and programs as appropriate. Under the GLRI, EPA has funded climate change-related work by states, tribes, federal agencies, academics and NGOs through competitive grants, state and tribal capacity grants, and Interagency Agreements. EPA has provided GLRI funding for a diverse suite of climate change-related projects including Great Lakes climate change research and modeling; adaptation plan development and implementation; ecosystem vulnerability assessments; outreach and education programs; habitat restoration and protection projects that will increase ecosystem resilience; and other projects that address climate change impacts. This presentation will discuss how the GLRI is helping to improve the climate change science needed to support the Action Plan. It will further describe how the GLRI is helping coordinate climate change efforts among Great Lakes states, tribes, Federal agencies, and other stakeholders. Finally, it will discuss how the GLRI is facilitating adaptation planning by our Great Lakes partners. The draft Lake Superior Ecosystem Climate Change Adaptation Plan serves as a case study for an integrated, collaborative, and coordinated climate change effort.

  19. Applicability of interferometric SAR technology to ground movement and pipeline monitoring

    NASA Astrophysics Data System (ADS)

    Grivas, Dimitri A.; Bhagvati, Chakravarthy; Schultz, B. C.; Trigg, Alan; Rizkalla, Moness

    1998-03-01

    This paper summarizes the findings of a cooperative effort between NOVA Gas Transmission Ltd. (NGTL), the Italian Natural Gas Transmission Company (SNAM), and Arista International, Inc., to determine whether current remote sensing technologies can be utilized to monitor small-scale ground movements over vast geographical areas. This topic is of interest due to the potential for small ground movements to cause strain accumulation in buried pipeline facilities. Ground movements are difficult to monitor continuously, but their cumulative effect over time can have a significant impact on the safety of buried pipelines. Interferometric synthetic aperture radar (InSAR or SARI) is identified as the most promising technique of those considered. InSAR analysis involves combining multiple images from consecutive passes of a radar imaging platform. The resulting composite image can detect changes as small as 2.5 to 5.0 centimeters (based on current analysis methods and radar satellite data of 5 centimeter wavelength). Research currently in progress shows potential for measuring ground movements as small as a few millimeters. Data needed for InSAR analysis is currently commercially available from four satellites, and additional satellites are planned for launch in the near future. A major conclusion of the present study is that InSAR technology is potentially useful for pipeline integrity monitoring. A pilot project is planned to test operational issues.

  20. Long-distance translocations to create a second millerbird population and reduce extinction risk

    USGS Publications Warehouse

    Holly Freifeld,; Sheldon Plentovich,; Chris Farmer,; Charles Kohley,; Peter Luscomb,; Work, Thierry M.; Daniel Tsukayama,; George Wallace,; Mark MacDonald,; Sheila Conant,

    2016-01-01

    Translocation is a conservation tool used with increasing frequency to create additional populations of threatened species. In addition to following established general guidelines for translocations, detailed planning to account for unique circumstances and intensive post-release monitoring to document outcomes and guide management are essential components of these projects. Recent translocation of the critically endangered Nihoa millerbird (Acrocephalus familiaris kingi) provides an example of this planning and monitoring. The Nihoa millerbird is a passerine bird endemic to Nihoa Island in the remote Northwestern Hawaiian Islands. The closely related, ecologically similar Laysan millerbird (Acrocephalus familiaris familiaris) went extinct on Laysan Island in the early 20th century when the island was denuded by introduced rabbits. To reduce extinction risk, we translocated 50 adult Nihoa millerbirds more than 1000 km by sea to Laysan, which has recovered substantially in the past century and has ample habitat and a rich prey-base for millerbirds. Following five years of intensive background research and planning, including development of husbandry techniques, fundraising, and regulatory compliance, translocations occurred in 2011 and 2012. Of 11 females in each cohort, 8 (2011 cohort) and 11 (2012 cohort) produced at least one brood of fledglings during their first year on Laysan. At the conclusion of monitoring in September 2014, 37 of the translocated birds were known to survive, and the population was estimated at 164 birds. The reintroduction of millerbirds to Laysan represents a milestone in the island's ongoing restoration.

  1. Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.

  2. The Chief Joseph Hatchery Program 2013 Annual Report

    USGS Publications Warehouse

    Baldwin, Casey; Pearl, Andrea; Laramie, Matthew; Rohrback, John; Phillips, Pat; Wolf, Keith

    2016-01-01

    The Chief Joseph Hatchery is the fourth hatchery obligated under the Grand Coulee Dam/Dry Falls project, originating in the 1940s. Leavenworth, Entiat, and Winthrop National Fish Hatcheries were built and operated as mitigation for salmon blockage at Grand Coulee Dam, but the fourth hatchery was not built, and the obligation was nearly forgotten. After the Colville Tribes successfully collaborated with the United States to resurrect the project, planning of the hatchery began in 2001 and construction was completed in 2013. The monitoring program began in 2012 and adult Chinook Salmon were brought on station for the first time in June 2013. BPA is the primary funding source for CJH, and the Mid-Columbia PUDs (Douglas, Grant and Chelan County) have entered into cost-share agreements with the tribes and BPA in order to meet some of their mitigation obligations. The CJH production level was set at 60% in 2013 in order to train staff and test hatchery facility systems during the first year of operation. Leavenworth National Fish Hatchery (LNFH) provided 422 Spring Chinook broodstock in June, 2013; representing the official beginning of CJH operations. In July and August the CCT used a purse seine vessel to collect 814 summer/fall Chinook as broodstock that were a continuation and expansion of the previous Similkameen Pond program. In-hatchery survival for most life stages exceeded survival targets and, as of April 2014, the program was on track to exceed the 60% production target for its start-up year. The CJH monitoring project collected field data to determine Chinook population status, trend, and hatchery effectiveness centered on five major activities; 1) rotary screw traps (juvenile outmigration, natural-origin smolt PIT tagging) 2) beach seine (naturalorigin smolt PIT tagging) 3) lower Okanogan adult fish pilot weir (adult escapement, proportion of hatchery-origin spawners [pHOS], broodstock) 4) spawning ground surveys (redd and carcass surveys)(viable salmonid population [VSP] parameters) 5) eDNA collection (VSP parameter—distribution/spatial structure). Adult summer/fall Chinook spawning escapement in 2013 was estimated to be 8,193, with more than 6,227 natural-origin spawners, which exceeded the recent five year and long term averages. The values for pHOS (0.24) and proportion of natural influence (PNI) (0.79) in 2013 exceeded the objectives (0.67), but the five year averages fell short of the goals (0.39 and 0.62, respectively). An Annual Program Review (APR) was held in March, 2014 to share hatchery production and monitoring data, review the salmon forecast for the upcoming year, and develop action plans for the hatchery, selective harvest, and monitoring projects. Based on a strong pre-season forecast of 67,500 Upper Columbia summer/fall Chinook, the plan for 2014 is to operate the hatchery at full program levels of 2 million summer/fall Chinook and 900,000 spring Chinook. To maximize PNI, broodstock for the integrated program should Chief Joseph Hatchery Program 2013 Annual Report 3 be 100% natural-origin broodstock (NOB) and CCT should plan to harvest their full allocation with the selective harvest program removing as many adult hatchery Chinook as possible with the purse seine, the weir, and at the hatchery ladder.

  3. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or moremore » BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.« less

  4. 13. Operational planning for a specific intervention.

    PubMed

    2014-05-01

    Every intervention must follow an operational plan. Operational plans delineate actions required to meet an objective that is part of the strategic plan (overarching goal). Operational plans dictate the critical pathways for the interventions that will be followed during and following the implementation of the intervention. Operational plans include: (1) an introduction and brief situation report; (2) an overview of the task(s), objectives, and the overarching goal to be addressed; (3) the methods that will be employed; (4) planning factors; (5) the resources that will be required including personnel, equipment, and supplies; (6) timelines, benchmarks, and milestones including their respective indicators, startup time, end point, and estimates of the time required for completion; (7) the administrative structure to be employed; (8) an operating budget; (9) the strategy for acquiring the funding required; (10) roles and responsibilities of the personnel including position descriptions and the competencies required of the personnel (skill sets); (11) mechanisms for monitoring the progress including the indicators that will be employed, (12) safety, including health of the personnel, required immunisations, accommodations, and reporting structure; (13) self-sufficiency; and (14) reporting and accounting. There are many generic items in an operational plan that can be used in successive plans. Without a detailed operational plan, interventions are doomed to probable failure and can profoundly negatively impact other projects operational in the area.

  5. Total and Spectral Solar Irradiance Sensor (TSIS) Project Overview

    NASA Technical Reports Server (NTRS)

    Carlisle, Candace; Wedge, Ronnice; Wu, Dong; Stello, Harry; Robinson, Renee

    2015-01-01

    The main objective of the Total and Spectral solar Irradiance Sensor (TSIS) is to acquire measurements to determine the direct and indirect effects of solar radiation on climate. TSIS total solar irradiance measurements will extend a 37-year long uninterrupted measurement record of incoming solar radiation, the dominant energy source driving the Earths climate and the most precise indicator of changes in the Suns energy output. TSIS solar spectral irradiance measurements will determine the regions of the Earths multi-layered atmosphere that are affected by solar variability, from which the solar forcing mechanisms causing changes in climate can be quantified. TSIS includes two instruments: the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM), integrated into a single payload. The TSIS TIM and SIM instruments are upgraded versions of the two instruments that are flying on the Solar Radiation and Climate Experiment (SORCE) mission launched in January 2003. TSIS was originally planned for the nadir-pointing National Polar-orbiting Operational Environmental Satellite System (NPOESS) spacecraft. The TSIS instrument passed a Critical Design Review (CDR) for NPOESS in December 2009. In 2010, TSIS was re-planned for the Joint Polar Satellite System (JPSS) Polar Free Flyer (PFF). The TSIS TIM, SIM, and associated electronics were built, tested, and successfully completed pre-ship review as of December 2013.In early 2014, NOAA and NASA agreed to fly TSIS on the International Space Station (ISS). In the FY16 Presidents Budget, NASA assumes responsibility for the TSIS mission on ISS. The TSIS project includes requirements, interface, design, build and test of the TSIS payload, including an updated pointing system, for accommodation on the ISS. It takes advantage of the prior development of the TSIS sensors and electronics. The International Space Station (ISS) program contributions include launch services and robotic installation of the TSIS payload onto an ISS Express Logistics Carrier, mission operations, and communications. Total and Spectral solar irradiance data products will be produced, calibrated, and made publically available through the Goddard Earth Science Data and Information Services Center (GES DISC).The NASA GSFC TSIS project at GSFC is responsible for project management, system engineering, safety and mission assurance, and engineering oversight for the TSIS payload. The TSIS project has contracted with the University of Colorado Laboratory for Atmospheric and Space Physics (LASP) for the design, development and testing of TSIS, support for ISS integration, science operations of the TSIS instrument, data processing, data evaluation and delivery to the GES DISC. TSIS will be delivered to Kennedy Space Center for integration in 2017, with launch and installation onto ISS planned for late 2017-early 2018. After a 90-day check-out period, NASA plans five years of TSIS operations.

  6. Project Work Plan 100-N Area Strontium-90 Treatability Demonstration Project: Phytoremediation Along the 100-N Columbia River Riparian Zone

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ainsworth, Calvin C.

    The 100-N Area Innovative Treatment and Remediation Demonstration (ITRD) identified phyto¬remediation as a potential technology both for the removal of 90Sr from the soil of the riparian zone and as a filter for groundwater along the Columbia River. Recent greenhouse and growth chamber studies have demonstrated the viability of phytoextraction to remove 90Sr from this area’s soil/water; in conjunction with monitored natural attenuation and an apatite barrier the process would make an effective treatment for remediation of the 100-N Area 90Sr plume. All activities associated with the 100-NR-1 and 100-NR-2 Operable Units of the Hanford 100-N Area have had, andmore » continue to have, significant regulatory and stakeholder participation. Beginning in 1998 with the ITRD process, presentations to the ITRD TAG were heavily attended by EPA, Washington State Department of Ecology, and stakeholders. In addition, three workshops have been held to receive regulatory and stakeholder feedback on monitored natural attenuation, the apatite barrier, and phytoremediation; these were held in Richland in August 2003, December 2004, and August 2005. The apatite injection treatability test plan (DOE 2005) describes phytoremediation as a technology to be evaluated during the March 2008 evaluation milestone as described in the Tri-Party Agreement change request (M-16-06-01 Change Control Form). If, during this evaluation milestone, phytoremediation is favorably evaluated it would be incorporated into the treatability test plan. The phytoremediation treatability test described in this proposal is strongly supported by the Washington State Department of Ecology.« less

  7. An integrated information system for the acquisition, management and sharing of environmental data aimed to decision making

    NASA Astrophysics Data System (ADS)

    La Loggia, Goffredo; Arnone, Elisa; Ciraolo, Giuseppe; Maltese, Antonino; Noto, Leonardo; Pernice, Umberto

    2012-09-01

    This paper reports the first results of the Project SESAMO - SistEma informativo integrato per l'acquisizione, geStione e condivisione di dati AMbientali per il supportO alle decisioni (Integrated Information System for the acquisition, management and sharing of environmental data aimed to decision making). The main aim of the project is to design and develop an integrated environmental information platform able to provide monitoring services for decision support, integrating data from different environmental monitoring systems (including WSN). This ICT platform, based on a service-oriented architecture (SOA), will be developed to coordinate a wide variety of data acquisition systems, based on heterogeneous technologies and communication protocols, providing different sort of environmental monitoring services. The implementation and validation of the SESAMO platform and its services will involve three specific environmental domains: 1) Urban water losses; 2) Early warning system for rainfall-induced landslides; 3) Precision irrigation planning. Services in the first domain are enabled by a low cost sensors network collecting and transmitting data, in order to allow the pipeline network managers to analyze pressure, velocity and discharge data for reducing water losses in an urban contest. This paper outlines the SESAMO functional and technological structure and then gives a concise description of the service design and development process for the second and third domain. Services in the second domain are enabled by a prototypal early warning system able to identify in near-real time high-risk zones of rainfall-induced landslides. Services in the third domain are aimed to optimize irrigation planning of vineyards depending on plant water stress.

  8. Ranch business planning and resource monitoring for rangeland sustainability

    Treesearch

    Kristie A. Maczko; John A. Tanaka; Michael Smith; Cindy Garretson-Weibel; Stanley F. Hamilton; John E. Mitchell; Gene Fults; Charles Stanley; Dick Loper; Larry D. Bryant; J. K. (Rooter) Brite

    2012-01-01

    Aligning a rancher's business plan goals with the capability of the ranch's rangeland resources improves the viability and sustainability of family ranches. Strategically monitoring the condition of soil, water, vegetation, wildlife, livestock production, and economics helps inform business plan goals. Business planning and resource monitoring help keep...

  9. Integrating experimental and numerical methods for a scenario-based quantitative assessment of subsurface energy storage options

    NASA Astrophysics Data System (ADS)

    Kabuth, Alina; Dahmke, Andreas; Hagrey, Said Attia al; Berta, Márton; Dörr, Cordula; Koproch, Nicolas; Köber, Ralf; Köhn, Daniel; Nolde, Michael; Tilmann Pfeiffer, Wolf; Popp, Steffi; Schwanebeck, Malte; Bauer, Sebastian

    2016-04-01

    Within the framework of the transition to renewable energy sources ("Energiewende"), the German government defined the target of producing 60 % of the final energy consumption from renewable energy sources by the year 2050. However, renewable energies are subject to natural fluctuations. Energy storage can help to buffer the resulting time shifts between production and demand. Subsurface geological structures provide large potential capacities for energy stored in the form of heat or gas on daily to seasonal time scales. In order to explore this potential sustainably, the possible induced effects of energy storage operations have to be quantified for both specified normal operation and events of failure. The ANGUS+ project therefore integrates experimental laboratory studies with numerical approaches to assess subsurface energy storage scenarios and monitoring methods. Subsurface storage options for gas, i.e. hydrogen, synthetic methane and compressed air in salt caverns or porous structures, as well as subsurface heat storage are investigated with respect to site prerequisites, storage dimensions, induced effects, monitoring methods and integration into spatial planning schemes. The conceptual interdisciplinary approach of the ANGUS+ project towards the integration of subsurface energy storage into a sustainable subsurface planning scheme is presented here, and this approach is then demonstrated using the examples of two selected energy storage options: Firstly, the option of seasonal heat storage in a shallow aquifer is presented. Coupled thermal and hydraulic processes induced by periodic heat injection and extraction were simulated in the open-source numerical modelling package OpenGeoSys. Situations of specified normal operation as well as cases of failure in operational storage with leaking heat transfer fluid are considered. Bench-scale experiments provided parameterisations of temperature dependent changes in shallow groundwater hydrogeochemistry. As a second example, the option of seasonal hydrogen storage in a deep saline aquifer is considered. The induced thermal and hydraulic multiphase flow processes were simulated. Also, an integrative approach towards geophysical monitoring of gas presence was evaluated by synthetically applying these monitoring methods to the synthetic, however realistically defined numerical storage scenarios. Laboratory experiments provided parameterisations of geochemical effects caused by storage gas leakage into shallow aquifers in cases of sealing failure. Ultimately, the analysis of realistically defined scenarios of subsurface energy storage within the ANGUS+ project allows a quantification of the subsurface space claimed by a storage operation and its induced effects. Acknowledgments: This work is part of the ANGUS+ project (www.angusplus.de) and funded by the German Federal Ministry of Education and Research (BMBF) as part of the energy storage initiative "Energiespeicher".

  10. Remote Monitoring of Soil Water Content, Temperature, and Heat Flow Using Low-Cost Cellular (3G) IoT Technology

    NASA Astrophysics Data System (ADS)

    Ham, J. M.

    2016-12-01

    New microprocessor boards, open-source sensors, and cloud infrastructure developed for the Internet of Things (IoT) can be used to create low-cost monitoring systems for environmental research. This project describes two applications in soil science and hydrology: 1) remote monitoring of the soil temperature regime near oil and gas operations to detect the thermal signature associated with the natural source zone degradation of hydrocarbon contaminants in the vadose zone, and 2) remote monitoring of soil water content near the surface as part of a global citizen science network. In both cases, prototype data collection systems were built around the cellular (2G/3G) "Electron" microcontroller (www.particle.io). This device allows connectivity to the cloud using a low-cost global SIM and data plan. The systems have cellular connectivity in over 100 countries and data can be logged to the cloud for storage. Users can view data real time over any internet connection or via their smart phone. For both projects, data logging, storage, and visualization was done using IoT services like Thingspeak (thingspeak.com). The soil thermal monitoring system was tested on experimental plots in Colorado USA to evaluate the accuracy and reliability of different temperature sensors and 3D printed housings. The soil water experiment included comparison opens-source capacitance-based sensors to commercial versions. Results demonstrate the power of leveraging IoT technology for field research.

  11. Application and Evaluation of ALOS PALSAR Data for Monitoring of Mining Induced Surface Deformations Using Interferometric Techniques

    NASA Astrophysics Data System (ADS)

    Walter, Diana; Wegmuller, Urs; Spreckels, Volker; Busch, Wolfgang

    2008-11-01

    The main objective of the projects "Determination of ground motions in mining areas by interferometric analyses of ALOS data" (ALOS ADEN 3576, ESA) and "Monitoring of mining induced surface deformation" (ALOS-RA-094, JAXA) is to evaluate PALSAR data for surface deformation monitoring, using interferometric techniques. We present monitoring results of surface movements for an active hard coal colliery of the German hard coal mining company RAG Deutsche Steinkohle (RAG). Underground mining activities lead to ground movements at the surface with maximum subsidence rates of about 10cm per month for the test site. In these projects the L-band sensor clearly demonstrates the good potential for deformation monitoring in active mining areas, especially in rural areas. In comparison to C-band sensors we clearly observe advantages in resolving the high deformation gradients that are present in this area and we achieve a more complete spatial coverage than with C-band. Extensive validation data based on levelling data and GPS measurements are available within RAǴs GIS based database "GeoMon" and thus enable an adequate analysis of the quality of the interferometric results. Previous analyses confirm the good accuracy of PALSAR data for deformation monitoring in mining areas. Furthermore, we present results of special investigations like precision geocoding of PALSAR data and corner reflector analysis. At present only DInSAR results are obtained due to the currently available number of PALSAR scenes. For the future we plan to also apply Persistent Scatterer Interferometry (PSI) using longer series of PALSAR data.

  12. Workshop proceedings: research and management in whitebark pine ecosystems

    USGS Publications Warehouse

    Kendall, Katherine C.; Coen, Brenda

    1994-01-01

    The purpose of this workshop is to exchange information on on-going and soon-to-be-initiated whitebark pine research and management projects. By doing so we hope to encourage future work on this valuable species. We also hope to promote the use of consistent methods for evaluation and investigation of whitebark pine, and to provide avenues of collaboration. Speakers will present information on a variety of topics related to whitebark pine management and research. Featured presentation topics include anthropomorphic utilization of whitepark pine forests, whitebark pine natural regeneration, blister rust and the decline of whitebark pine, blister rust resistance studies, ecological mapping of the species, restoration and management projects, and survey/monitoring techniques. Information gained from these presentations may hopefully be used in the planning of future projects for the conservation of whitebark pine.

  13. An inventory and monitoring plan for a Sonoran Desert ecosystem; Barry M. Goldwater Range-West

    USGS Publications Warehouse

    Villarreal, Miguel L.; van Riper, Charles; Lovich, Robert E.; Palmer, Robert L.; Nauman, Travis; Studd, Sarah E.; Drake, Sam; Rosenberg, Abigail S.; Malusa, Jim; Pearce, Ronald L.

    2011-01-01

    Marine Corps Air Station Yuma manages the Barry M. Goldwater Range-West, which encompasses approximately 2,800 square kilometers of Sonoran Desert habitat in southwestern Arizona. The Barry M. Goldwater Range is a major U.S. military installation designed as an air combat training location for the U.S. Marine Corps and U.S. Air Force, but it also includes some of the most pristine desert habitat in the United States. In an effort to ensure the long-term viability of this unique natural resource, the U.S. Geological Survey (USGS) has developed an Integrated Natural Resources Management Plan and Inventory and Monitoring Plan to guide natural resource management of the Barry M. Goldwater Range-West. This Inventory and Monitoring Plan provides a framework for long-term ecosystem monitoring on Barry M. Goldwater Range-West lands by identifying existing and potential threats to ecosystem function, prioritizing resources for monitoring, and providing information and protocols necessary to initiate a long-term ecosystem monitoring program. The Inventory and Monitoring Plan and related protocols were developed through extensive review of existing Sonoran Desert monitoring programs and monitoring literature and through a 2-day workshop with resource managers, monitoring experts, and other stakeholders. The Barry M. Goldwater Range-West Inventory and Monitoring Plan stresses the importance of regional monitoring partnerships and protocol standardization for understanding landscape-scale ecosystem changes in the Sonoran Desert; information and protocols contained within the plan may also be of interest to land managers engaged in large-scale ecosystem monitoring and adaptive management of other arid regions.

  14. Hydrologic index development and application to selected Coastwide Reference Monitoring System sites and Coastal Wetlands Planning, Protection and Restoration Act projects

    USGS Publications Warehouse

    Snedden, Gregg A.; Swenson, Erick M.

    2012-01-01

    Hourly time-series salinity and water-level data are collected at all stations within the Coastwide Reference Monitoring System (CRMS) network across coastal Louisiana. These data, in addition to vegetation and soils data collected as part of CRMS, are used to develop a suite of metrics and indices to assess wetland condition in coastal Louisiana. This document addresses the primary objectives of the CRMS hydrologic analytical team, which were to (1) adopt standard time-series analytical techniques that could effectively assess spatial and temporal variability in hydrologic characteristics across the Louisiana coastal zone on site, project, basin, and coastwide scales and (2) develop and apply an index based on wetland hydrology that can describe the suitability of local hydrology in the context of maximizing the productivity of wetland plant communities. Approaches to quantifying tidal variability (least squares harmonic analysis) and partitioning variability of time-series data to various time scales (spectral analysis) are presented. The relation between marsh elevation and the tidal frame of a given hydrograph is described. A hydrologic index that integrates water-level and salinity data, which are collected hourly, with vegetation data that are collected annually is developed. To demonstrate its utility, the hydrologic index is applied to 173 CRMS sites across the coast, and variability in index scores across marsh vegetation types (fresh, intermediate, brackish, and saline) is assessed. The index is also applied to 11 sites located in three Coastal Wetlands Planning, Protection and Restoration Act projects, and the ability of the index to convey temporal hydrologic variability in response to climatic stressors and restoration measures, as well as the effect that this community may have on wetland plant productivity, is illustrated.

  15. Application of NARR-based NLDAS Ensemble Simulations to Continental-Scale Drought Monitoring

    NASA Astrophysics Data System (ADS)

    Alonge, C. J.; Cosgrove, B. A.

    2008-05-01

    Government estimates indicate that droughts cause billions of dollars of damage to agricultural interests each year. More effective identification of droughts would directly benefit decision makers, and would allow for the more efficient allocation of resources that might mitigate the event. Land data assimilation systems, with their high quality representations of soil moisture, present an ideal platform for drought monitoring, and offer many advantages over traditional modeling systems. The recently released North American Regional Reanalysis (NARR) covers the NLDAS domain and provides all fields necessary to force the NLDAS for 27 years. This presents an ideal opportunity to combine NARR and NLDAS resources into an effective real-time drought monitor. Toward this end, our project seeks to validate and explore the NARR's suitability as a base for drought monitoring applications - both in terms of data set length and accuracy. Along the same lines, the project will examine the impact of the use of different (longer) LDAS model climatologies on drought monitoring, and will explore the advantages of ensemble simulations versus single model simulations in drought monitoring activities. We also plan to produce a NARR- and observation-based high quality 27 year, 1/8th degree, 3-hourly, land surface and meteorological forcing data sets. An investigation of the best way to force an LDAS-type system will also be made, with traditional NLDAS and NLDASE forcing options explored. This presentation will focus on an overview of the drought monitoring project, and will include a summary of recent progress. Developments include the generation of forcing data sets, ensemble LSM output, and production of model-based drought indices over the entire NLDAS domain. Project forcing files use 32km NARR model output as a data backbone, and include observed precipitation (blended CPC gauge, PRISM gauge, Stage II, HPD, and CMORPH) and a GOES-based bias correction of downward solar radiation. Multiple LSM simulations have been conducted using the Noah, Mosaic, CLM3, HYSSiB, and Catchment LSMs. These simulations, along with the NARR-based forcing data form the basis for several drought indices. These include standard measures such as the Palmer-type indices, LDAS-type percentile and anomaly values, and CLM3-based vegetation condition index values.

  16. NASA space station automation: AI-based technology review

    NASA Technical Reports Server (NTRS)

    Firschein, O.; Georgeff, M. P.; Park, W.; Neumann, P.; Kautz, W. H.; Levitt, K. N.; Rom, R. J.; Poggio, A. A.

    1985-01-01

    Research and Development projects in automation for the Space Station are discussed. Artificial Intelligence (AI) based automation technologies are planned to enhance crew safety through reduced need for EVA, increase crew productivity through the reduction of routine operations, increase space station autonomy, and augment space station capability through the use of teleoperation and robotics. AI technology will also be developed for the servicing of satellites at the Space Station, system monitoring and diagnosis, space manufacturing, and the assembly of large space structures.

  17. The Emerging Shield. The Air Force and the Evolution of Continental Air Defense 1945-1960

    DTIC Science & Technology

    1991-01-01

    flight plans other than those reported to the Presque Isle site. No one blamed the pilots; they had reported their changes in flighit to Canadian flight...monitor stations. Communications between the stations and ADC’s Presque Isle radar site had failed, and the course changes were not identified in the...Identification Zone: 134 "Pregnant Goose": 20 GOC on coast of: 156 Presque Isle , Maine: 170-71 Northw st emergency air defense for: Project CHARLEs: 145

  18. Balanced program plan: analysis for biomedical and environmental research. Volume 5. Oil shale technology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1976-06-01

    Oil shale technology has been divided into two sub-technologies: surfaceprocessing and in-situ processing. Definition of the research programs is essentially an amplification of the five King-Muir categories: (A) pollutants: characterization, measurement, and monitoring; (B) physical and chemical processes and effects; (C) health effects; (D) ecological processes and effects; and (E) integrated assessment. Twenty-three biomedical and environmental research projects are described as to program title, scope, milestones, technology time frame, program unit priority, and estimated program unit cost.

  19. Application of remote sensing to state and regional problems. [Mississippi

    NASA Technical Reports Server (NTRS)

    Miller, W. F.; Carter, B. D.; Solomon, J. L.; Williams, S. G.; Powers, J. S.; Clark, J. R. (Principal Investigator)

    1980-01-01

    Progress is reported in the following areas: remote sensing applications to land use planning Lowndes County, applications of LANDSAT data to strip mine inventory and reclamation, white tailed deer habitat evaluation using LANDSAT data, remote sensing data analysis support system, and discrimination of unique forest habitats in potential lignite areas of Mississippi. Other projects discussed include LANDSAT change discrimination in gravel operations, environmental impact modeling for highway corridors, and discrimination of fresh water wetlands for inventory and monitoring.

  20. Tools and data acquisition of borehole geophysical logging for the Florida Power and Light Company Turkey Point Power Plant in support of a groundwater, surface-water, and ecological monitoring plan, Miami-Dade County, Florida

    USGS Publications Warehouse

    Wacker, Michael A.

    2010-01-01

    Borehole geophysical logs were obtained from selected exploratory coreholes in the vicinity of the Florida Power and Light Company Turkey Point Power Plant. The geophysical logging tools used and logging sequences performed during this project are summarized herein to include borehole logging methods, descriptions of the properties measured, types of data obtained, and calibration information.

  1. U.S. commercial space policies - Implications for developing countries

    NASA Technical Reports Server (NTRS)

    Gillam, Isaac T., IV; Stone, Barbara A.

    1987-01-01

    Recent U.S. policy developments on the commercial use of space are summarized and their international implications are considered. Attention is given to successful applications of technology developed in space, including an implantable cancer medication system, an implantable defibrillator, an ultrasonic residual stress monitor, and aquaculture treatment techniques. NASA projects involving bioengineering and rehabilitation applications are summarized, and plans to investigate high-temperature superconductors in space are addressed. Recent agreements entred into by NASA for space commercial studies are reviewed.

  2. Recent Development Efforts for Military Airships

    DTIC Science & Technology

    2011-11-01

    the The cover shows a U.S. Navy MZ-3A manned airship landing at Lake Front Airport, New Orleans, Loui provide support for the Deepwater Unified Command...airship. The Navy has no announced plans to deploy the MZ-3A over- seas, but it was used to help monitor the Deepwater Horizon oil spill in the Gulf of...2003 to 2006, the Defense Advanced Research Projects Agency pursued a program called the Hybrid Ultra -Large Aircraft (HULA), or Walrus, with the goal

  3. Proceedings of a Seminar on Initial Project Management Plans for Hydrologic Engineering and Economic Analysis Held at Otter Rock, Oregon on 22-24 September 1992

    DTIC Science & Technology

    1992-09-24

    for the fifteen remaining study sites. The total number of structures to be surveyed was estimated at 800 to 1,000. When the contract was complete...Corps of Engineers real estate appraisers or contract appraisers, should be listed as a separate task. The approximate number of structures to be...DOWNGRADING SCHEDULE Distribution of this document is unlimited. 4. PERFORMING ORGANIZATION REPORT NUMBER (S) S. MONITORING ORGANIZATION REPORT NUMBER (S

  4. Developing a Prototype Handbook for Monitoring and Evaluating Department of Defense Humanitarian Assistance Projects

    DTIC Science & Technology

    2011-01-01

    caloric intake could stand alone as a single specific indicator for com- munity nutritional status if necessary. The caloric intake indicator is also...principle, the user’s guide and the primer can each stand alone. Those already experienced with M&E or assessment can go directly to the user’s...planning and data collection were very valuable, as was the ability for each section of the handbook (i.e., the primer and user’s guide) to stand

  5. [Implementation of a safety and health planning system in a teaching hospital].

    PubMed

    Mariani, F; Bravi, C; Dolcetti, L; Moretto, A; Palermo, A; Ronchin, M; Tonelli, F; Carrer, P

    2007-01-01

    University Hospital "L. Sacco" had started in 2006 a two-year project in order to set up a "Health and Safety Management System (HSMS)" referring to the technical guideline OHSAS 18001:1999 and the UNI and INAIL "Guidelines for a health and safety management system at workplace". So far, the following operations had been implemented: Setting up of a specific Commission within the Risk Management Committee; Identification and appointment of Departmental Representatives of HSMS; Carrying out of a training course addressed to Workers Representatives for Safety and Departmental Representatives of HSMS; Development of an Integrated Informative System for Prevention and Safety; Auditors qualification; Inspection of the Occupational Health Unit and the Prevention and Safety Service: reporting of critical situations and monitoring solutions adopted. Short term objectives are: Self-evaluation through check-lists of each department; Sharing of the Improvement Plan among the departments of the hospital; Planning of Health and Safety training activities in the framework of the Hospital Training Plan; Safety audit.

  6. Quality-assurance plan for groundwater activities, U.S. Geological Survey, Washington Water Science Center

    USGS Publications Warehouse

    Kozar, Mark D.; Kahle, Sue C.

    2013-01-01

    This report documents the standard procedures, policies, and field methods used by the U.S. Geological Survey’s (USGS) Washington Water Science Center staff for activities related to the collection, processing, analysis, storage, and publication of groundwater data. This groundwater quality-assurance plan changes through time to accommodate new methods and requirements developed by the Washington Water Science Center and the USGS Office of Groundwater. The plan is based largely on requirements and guidelines provided by the USGS Office of Groundwater, or the USGS Water Mission Area. Regular updates to this plan represent an integral part of the quality-assurance process. Because numerous policy memoranda have been issued by the Office of Groundwater since the previous groundwater quality assurance plan was written, this report is a substantial revision of the previous report, supplants it, and contains significant additional policies not covered in the previous report. This updated plan includes information related to the organization and responsibilities of USGS Washington Water Science Center staff, training, safety, project proposal development, project review procedures, data collection activities, data processing activities, report review procedures, and archiving of field data and interpretative information pertaining to groundwater flow models, borehole aquifer tests, and aquifer tests. Important updates from the previous groundwater quality assurance plan include: (1) procedures for documenting and archiving of groundwater flow models; (2) revisions to procedures and policies for the creation of sites in the Groundwater Site Inventory database; (3) adoption of new water-level forms to be used within the USGS Washington Water Science Center; (4) procedures for future creation of borehole geophysics, surface geophysics, and aquifer-test archives; and (5) use of the USGS Multi Optional Network Key Entry System software for entry of routine water-level data collected as part of long-term water-level monitoring networks.

  7. Quality-assurance plan and field methods for quality-of-water activities, U.S. Geological Survey, Idaho National Engineering Laboratory, Idaho

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mann, L.J.

    1996-10-01

    Water-quality activities at the Idaho National Engineering Laboratory (INEL) Project Office are part of the US Geological Survey`s (USGS) Water Resources Division (WRD) mission of appraising the quantity and quality of the Nation`s water resources. The purpose of the Quality Assurance Plan (QAP) for water-quality activities performed by the INEL Project Office is to maintain and improve the quality of technical products, and to provide a formal standardization, documentation, and review of the activities that lead to these products. The principles of this plan are as follows: (1) water-quality programs will be planned in a competent manner and activities willmore » be monitored for compliance with stated objectives and approaches; (2) field, laboratory, and office activities will be performed in a conscientious and professional manner in accordance with specified WRD practices and procedures by qualified and experienced employees who are well trained and supervised, if or when, WRD practices and procedures are inadequate, data will be collected in a manner that its quality will be documented; (3) all water-quality activities will be reviewed for completeness, reliability, credibility, and conformance to specified standards and guidelines; (4) a record of actions will be kept to document the activity and the assigned responsibility; (5) remedial action will be taken to correct activities that are deficient.« less

  8. 40 CFR Table 4 to Subpart Hhhhhhh... - Applicability of the General Provisions to Part 63

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... SSM plan for continuous monitoring systems No. § 63.8(c)(5) Continuous opacity monitoring system...) Written procedures for continuous monitoring systems Yes, except for last sentence, which refers to an SSM plan. SSM plans are not required § 63.8(e) Continuous monitoring systems performance evaluation Yes...

  9. The accuracy of general practitioner workforce projections

    PubMed Central

    2013-01-01

    Background Health workforce projections are important instruments to prevent imbalances in the health workforce. For both the tenability and further development of these projections, it is important to evaluate the accuracy of workforce projections. In the Netherlands, health workforce projections have been done since 2000 to support health workforce planning. What is the accuracy of the techniques of these Dutch general practitioner workforce projections? Methods We backtested the workforce projection model by comparing the ex-post projected number of general practitioners with the observed number of general practitioners between 1998 and 2011. Averages of historical data were used for all elements except for inflow in training. As the required training inflow is the key result of the workforce planning model, and has actually determined past adjustments of training inflow, the accuracy of the model was backtested using the observed training inflow and not an average of historical data to avoid the interference of past policy decisions. The accuracy of projections with different lengths of projection horizon and base period (on which the projections are based) was tested. Results The workforce projection model underestimated the number of active Dutch general practitioners in most years. The mean absolute percentage errors range from 1.9% to 14.9%, with the projections being more accurate in more recent years. Furthermore, projections with a shorter projection horizon have a higher accuracy than those with a longer horizon. Unexpectedly, projections with a shorter base period have a higher accuracy than those with a longer base period. Conclusions According to the results of the present study, forecasting the size of the future workforce did not become more difficult between 1998 and 2011, as we originally expected. Furthermore, the projections with a short projection horizon and a short base period are more accurate than projections with a longer projection horizon and base period. We can carefully conclude that health workforce projections can be made with data based on relatively short base periods, although detailed data are still required to monitor and evaluate the health workforce. PMID:23866676

  10. Introduction of an Emergency Response Plan for flood loading of Sultan Abu Bakar Dam in Malaysia

    NASA Astrophysics Data System (ADS)

    Said, N. F. Md; Sidek, L. M.; Basri, H.; Muda, R. S.; Razad, A. Z. Abdul

    2016-03-01

    Sultan Abu Bakar Dam Emergency Response Plan (ERP) is designed to assist employees for identifying, monitoring, responding and mitigation dam safety emergencies. This paper is outlined to identification of an organization chart, responsibility for emergency management team and triggering level in Sultan Abu Bakar Dam ERP. ERP is a plan that guides responsibilities for proper operation of Sultan Abu Bakar Dam in respond to emergency incidents affecting the dam. Based on this study four major responsibilities are needed for Abu Bakar Dam owing to protect any probable risk for downstream which they can be Incident Commander, Deputy Incident Commander, On-Scene Commander, Civil Engineer. In conclusion, having organization charts based on ERP studies can be helpful for decreasing the probable risks in any projects such as Abu Bakar Dam and it is a way to identify and suspected and actual dam safety emergencies.

  11. The development of an adolescent smoking cessation intervention--an Intervention Mapping approach to planning.

    PubMed

    Dalum, Peter; Schaalma, Herman; Kok, Gerjo

    2012-02-01

    The objective of this project was to develop a theory- and evidence-based adolescent smoking cessation intervention using both new and existing materials. We used the Intervention Mapping framework for planning health promotion programmes. Based on a needs assessment, we identified important and changeable determinants of cessation behaviour, specified change objectives for the intervention programme, selected theoretical change methods for accomplishing intervention objectives and finally operationalized change methods into practical intervention strategies. We found that guided practice, modelling, self-monitoring, coping planning, consciousness raising, dramatic relief and decisional balance were suitable methods for adolescent smoking cessation. We selected behavioural journalism, guided practice and Motivational Interviewing as strategies in our intervention. Intervention Mapping helped us to develop as systematic adolescent smoking cessation intervention with a clear link between behavioural goals, theoretical methods, practical strategies and materials and with a strong focus on implementation and recruitment. This paper does not present evaluation data.

  12. Sampling and monitoring for closure

    USGS Publications Warehouse

    McLemore, V.T.; Russell, C.C.; Smith, K.S.

    2004-01-01

    The Metals Mining Sector of the Acid Drainage Technology Initiative (ADTI-MMS) addresses technical drainage-quality issues related to metal mining and related metallurgical operations, for future and active mines, as well as, for historical mines and mining districts. One of the first projects of ADTI-MMS is to develop a handbook describing the best sampling, monitoring, predicting, mitigating, and modeling of drainage from metal mines, pit lakes and related metallurgical facilities based upon current scientific and engineering practices. One of the important aspects of planning a new mine in today's regulatory environment is the philosophy of designing a new or existing mine or expansion of operations for ultimate closure. The holistic philosophy taken in the ADTI-MMS handbook maintains that sampling and monitoring programs should be designed to take into account all aspects of the mine-life cycle. Data required for the closure of the operation are obtained throughout the mine-life cycle, from exploration through post-closure.

  13. Computer modeling and design of diagnostic workstations and radiology reading rooms

    NASA Astrophysics Data System (ADS)

    Ratib, Osman M.; Amato, Carlos L.; Balbona, Joseph A.; Boots, Kevin; Valentino, Daniel J.

    2000-05-01

    We used 3D modeling techniques to design and evaluate the ergonomics of diagnostic workstation and radiology reading room in the planning phase of building a new hospital at UCLA. Given serious space limitations, the challenge was to provide more optimal working environment for radiologists in a crowded and busy environment. A particular attention was given to flexibility, lighting condition and noise reduction in rooms shared by multiple users performing diagnostic tasks as well as regular clinical conferences. Re-engineering workspace ergonomics rely on the integration of new technologies, custom designed cabinets, indirect lighting, sound-absorbent partitioning and geometric arrangement of workstations to allow better privacy while optimizing space occupation. Innovations included adjustable flat monitors, integration of videoconferencing and voice recognition, control monitor and retractable keyboard for optimal space utilization. An overhead compartment protecting the monitors from ambient light is also used as accessory lightbox and rear-view projection screen for conferences.

  14. Biowaste monitoring system for shuttle

    NASA Technical Reports Server (NTRS)

    Fogal, G. L.; Sauer, R. L.

    1975-01-01

    The acquisition of crew biomedical data has been an important task on all manned space missions from Project Mercury through the recently completed Skylab Missions. The monitoring of metabolic wastes from the crew is an important aspect of this activity. On early missions emphasis was placed on the collection and return of biowaste samples for post-mission analysis. On later missions such as Skylab, equipment for inflight measurement was also added. Life Science experiments are being proposed for Shuttle missions which will require the inflight measurement and sampling of metabolic wastes. In order to minimize the crew impact associated with these requirements, a high degree of automation of these processes will be required. This paper reviews the design and capabilities of urine biowaste monitoring equipment provided on past-manned space programs and defines and describes the urine volume measurement and sampling equipment planned for the Shuttle Orbiter program.

  15. ICPP environmental monitoring report CY-1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-04-01

    Summarized in this report are the data collected through Environmental Monitoring programs conducted at the Idaho Chemical Processing Plant (ICPP) by the Environmental Protection Department. The ICPP is responsible for complying with all applicable Federal, State, Local and DOE Rules, Regulations and Orders. Radiological effluent and emissions are regulated by the DOE in accordance with the Derived Concentration Guides (DCGs). The State of Idaho regulates nonradiological waste resulting from the ICPP operations including airborne, liquid, and solid waste. The Environmental Department updated the Quality Assurance (QA) Project Plan for Environmental Monitoring activities during the third quarter of 1992. QA activitiesmore » have resulted in the ICPP`s implementation of the Environmental Protection Agency (EPA) rules and guidelines pertaining to the collection, analyses, and reporting of environmentally related samples. Where no EPA methods for analyses existed for radionuclides, Lockheed Idaho Technologies Company (LITCO) methods were used.« less

  16. ICPP environmental monitoring report CY-1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-05-01

    Summarized in this report are the data collected through Environmental Monitoring programs conducted at the Idaho Chemical Processing Plant (ICPP) by the Environmental Protection Department. The ICPP is responsible for complying with all applicable Federal, State, Local and DOE Rules, Regulations and Orders. Radiological effluent and emissions are regulated by the DOE in accordance with the Derived Concentration Guides (DCGs) as presented in DOE Order 5400.5. The State of Idaho regulates nonradiological waste resulting from the ICPP operations including airborne, liquid, and solid waste. The Environmental Department updated the Quality Assurance (QA) Project Plan for Environmental Monitoring activities during themore » third quarter of 1992. QA activities have resulted in the ICPP`s implementation of the Environmental Protection Agency (EPA) rules and guidelines pertaining to the collection, analyses, and reporting of environmentally related samples. Where no EPA methods for analyses existed for radionuclides, LITCO methods were used.« less

  17. Water Vapor Monitoring at the Roque de LOS Muchachos Observatory

    NASA Astrophysics Data System (ADS)

    Rodriguez-Espinosa, J. M.; Kidger, M.; del Rosario, J. C.; Trancho, G.

    1997-12-01

    We present the first results from a long-term campaign of water vapor monitoring at the Roque de los Muchachos Observatory (Canary Islands, Spain). This observatory is situated on a volcanic peak, on the small island of La Palma. Although its altitude is relatively low (2400 meters), our initial site-testing, taken for site selection for the Spanish 10m telescope project, shows that a significant fraction of nights have water vapor column of 1mm, or lower, with values of 2mm and lower being relatively common, even in summer. The water vapor column can be stable at under 1mm for several nights, with only minimal variations. We contrast the results obtained using an infrared radiometer (on loan from Kitt Peak National Observatory), with those obtained using the 940nm water vapor line and comment briefly on plans for future automatic monitoring of water vapor at the observatory.

  18. A planned care approach and patient registry to improve adherence to clinical guidelines for the diagnosis and management of attention-deficit/hyperactivity disorder.

    PubMed

    Geltman, Paul L; Fried, Lise E; Arsenault, Lisa N; Knowles, Alice M; Link, David A; Goldstein, Joel N; Perrin, James M; Hacker, Karen A

    2015-01-01

    Attention-deficit/hyperactivity disorder (ADHD) affects almost 2.4 million US children. Because American Academy of Pediatrics guidelines for ADHD recommend use of standardized diagnostic instruments, regular follow-up and the chronic care model, this pilot project sought to implement and assess an electronic registry of patients with ADHD combined with care coordination by a planned care team. This quality improvement project was structured with 2 intervention and 2 control clinics to facilitate evaluation of the use of a planned care system for management of ADHD. Care teams included a pediatrician, nurse, medical assistant, and care coordinator and tracked patients using an electronic registry with data drawn from the EMR. Clinical work flows were pilot tested to facilitate use of the Vanderbilt scales and their incorporation into the EMR at intervention sites. Outcome measures included 2 recommended clinical follow-ups based on HEDIS measures as well as use of the Vanderbilt rating scales. Initiation phase measure was for follow-up after initiating medication, while the continuation phase measure was for subsequent follow-up during the first year of treatment. Measures were monitored during the project year and then also in the ensuing period of spread of the intervention to other sites. Although the modified HEDIS initiation phase measure for patients newly on medication remained static at approximately 50% throughout the project period, the continuation phase measure showed improvement from 35% at baseline to 45% at the end of the project assessment year, a 29% increase. Follow-up for patients stable on medications also remained unchanged during the project period, but during subsequent spreading of the intervention to nonproject sites, follow-up of these patients improved to over 90%. In adjusted analyses, patients with ADHD at intervention sites were over 2 times more likely than patients at control sites to have had a Vanderbilt score documented in their records. The project achieved modest improvements in the diagnostic and treatment process for patients with ADHD. The use of a planned care system and electronic patient registry shows promise for improving the diagnosis and treatment process for patients with ADHD. Copyright © 2015 Academic Pediatric Association. Published by Elsevier Inc. All rights reserved.

  19. Comprehensive assessment of toxic emissions from coal-fired power plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, T D; Schmidt, C E; Radziwon, A S

    1991-01-01

    The Pittsburgh Energy Technology Center (PETC) of the US Department of Energy (DOE) has two current investigations, initiated before passage of the Clean Air Act Amendment (CAAA), that will determine the air toxic emissions from coal-fired electric utilities. DOE has contracted with Battelle Memorial Institute and Radian corporation to conduct studies focusing on the potential air toxics, both organic and inorganic, associated with different size fractions of fine particulate matter emitted from power plant stacks. Table 2 indicates the selected analytes to be investigated during these studies. PETC is also developing guidance on the monitoring of Hazardous Air Pollutants (HAPS)more » to be incorporated in the Environmental Monitoring plans for the demonstration projects in its Clean Coal Technology Program.« less

  20. 78 FR 54949 - Major Project Financial Plan Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ...'' (GA-090-751). That report recommended that Financial Plans include the cost of financing the project... Project Financial Plan Guidance AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice; Request for comments. SUMMARY: This notice requests comments on draft Major Project Financial Plan...

Top