24 CFR 1003.302 - Project specific threshold requirements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Project specific threshold requirements. 1003.302 Section 1003.302 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN... Purpose Grant Application and Selection Process § 1003.302 Project specific threshold requirements. (a...
24 CFR 92.612 - Project requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Project requirements. 92.612 Section 92.612 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development HOME INVESTMENT PARTNERSHIPS PROGRAM American Dream Downpayment Initiative § 92.612 Project...
24 CFR 92.612 - Project requirements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Project requirements. 92.612 Section 92.612 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development HOME INVESTMENT PARTNERSHIPS PROGRAM American Dream Downpayment Initiative § 92.612 Project...
24 CFR 92.612 - Project requirements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Project requirements. 92.612 Section 92.612 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development HOME INVESTMENT PARTNERSHIPS PROGRAM American Dream Downpayment Initiative § 92.612 Project...
24 CFR 92.612 - Project requirements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Project requirements. 92.612 Section 92.612 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development HOME INVESTMENT PARTNERSHIPS PROGRAM American Dream Downpayment Initiative § 92.612 Project...
24 CFR 92.612 - Project requirements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Project requirements. 92.612 Section 92.612 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development HOME INVESTMENT PARTNERSHIPS PROGRAM American Dream Downpayment Initiative § 92.612 Project...
SE Requirements Development Tool User Guide
DOE Office of Scientific and Technical Information (OSTI.GOV)
Benson, Faith Ann
2016-05-13
The LANL Systems Engineering Requirements Development Tool (SERDT) is a data collection tool created in InfoPath for use with the Los Alamos National Laboratory’s (LANL) SharePoint sites. Projects can fail if a clear definition of the final product requirements is not performed. For projects to be successful requirements must be defined early in the project and those requirements must be tracked during execution of the project to ensure the goals of the project are met. Therefore, the focus of this tool is requirements definition. The content of this form is based on International Council on Systems Engineering (INCOSE) and Departmentmore » of Defense (DoD) process standards and allows for single or collaborative input. The “Scoping” section is where project information is entered by the project team prior to requirements development, and includes definitions and examples to assist the user in completing the forms. The data entered will be used to define the requirements and once the form is filled out, a “Requirements List” is automatically generated and a Word document is created and saved to a SharePoint document library. SharePoint also includes the ability to download the requirements data defined in the InfoPath from into an Excel spreadsheet. This User Guide will assist you in navigating through the data entry process.« less
NASA Technical Reports Server (NTRS)
Allen, B. Danette
1998-01-01
In the traditional 'waterfall' model of the software project life cycle, the Requirements Phase ends and flows into the Design Phase, which ends and flows into the Development Phase. Unfortunately, the process rarely, if ever, works so smoothly in practice. Instead, software developers often receive new requirements, or modifications to the original requirements, well after the earlier project phases have been completed. In particular, projects with shorter than ideal schedules are highly susceptible to frequent requirements changes, as the software requirements analysis phase is often forced to begin before the overall system requirements and top-level design are complete. This results in later modifications to the software requirements, even though the software design and development phases may be complete. Requirements changes received in the later stages of a software project inevitably lead to modification of existing developed software. Presented here is a series of software design techniques that can greatly reduce the impact of last-minute requirements changes. These techniques were successfully used to add built-in flexibility to two complex software systems in which the requirements were expected to (and did) change frequently. These large, real-time systems were developed at NASA Langley Research Center (LaRC) to test and control the Lidar In-Space Technology Experiment (LITE) instrument which flew aboard the space shuttle Discovery as the primary payload on the STS-64 mission.
ERIC Educational Resources Information Center
Vlas, Radu Eduard
2012-01-01
Open source projects do have requirements; they are, however, mostly informal, text descriptions found in requests, forums, and other correspondence. Understanding such requirements provides insight into the nature of open source projects. Unfortunately, manual analysis of natural language requirements is time-consuming, and for large projects,…
Building CHAOS: An Operating System for Livermore Linux Clusters
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garlick, J E; Dunlap, C M
2003-02-21
The Livermore Computing (LC) Linux Integration and Development Project (the Linux Project) produces and supports the Clustered High Availability Operating System (CHAOS), a cluster operating environment based on Red Hat Linux. Each CHAOS release begins with a set of requirements and ends with a formally tested, packaged, and documented release suitable for use on LC's production Linux clusters. One characteristic of CHAOS is that component software packages come from different sources under varying degrees of project control. Some are developed by the Linux Project, some are developed by other LC projects, some are external open source projects, and some aremore » commercial software packages. A challenge to the Linux Project is to adhere to release schedules and testing disciplines in a diverse, highly decentralized development environment. Communication channels are maintained for externally developed packages in order to obtain support, influence development decisions, and coordinate/understand release schedules. The Linux Project embraces open source by releasing locally developed packages under open source license, by collaborating with open source projects where mutually beneficial, and by preferring open source over proprietary software. Project members generally use open source development tools. The Linux Project requires system administrators and developers to work together to resolve problems that arise in production. This tight coupling of production and development is a key strategy for making a product that directly addresses LC's production requirements. It is another challenge to balance support and development activities in such a way that one does not overwhelm the other.« less
ERIC Educational Resources Information Center
Wong, Wilson; Pepe, James; Englander, Irv
2017-01-01
Information systems capstone projects aim to prepare students for what they will encounter in the industry after graduation. Corporate application development is often a complex endeavor that requires coordination between related products. For example, software development in the mobile application sector may require a coordinated parallel…
TOPEX Project Radar Altimeter Development Requirements and Specifications, Version 6.0
NASA Technical Reports Server (NTRS)
Rossi, Laurence C.
2003-01-01
This document provides the guidelines by which the TOPEX Radar Altimeter hardware development effort for the TOPEX flight project shall be implemented and conducted. The conduct of this activity shall take maximum advantage of the efforts expended during the TOPEX Radar Altimeter Advanced Technology Model development program and other related Radar Altimeter development efforts. This document complies with the TOPEX Project Office document 633-420 (D-2218), entitled, "TOPEX Project Requirements and Constraints for the NASA Radar Altimeter" dated December 1987.
A Scenario-Based Process for Requirements Development: Application to Mission Operations Systems
NASA Technical Reports Server (NTRS)
Bindschadler, Duane L.; Boyles, Carole A.
2008-01-01
The notion of using operational scenarios as part of requirements development during mission formulation (Phases A & B) is widely accepted as good system engineering practice. In the context of developing a Mission Operations System (MOS), there are numerous practical challenges to translating that notion into the cost-effective development of a useful set of requirements. These challenges can include such issues as a lack of Project-level focus on operations issues, insufficient or improper flowdown of requirements, flowdown of immature or poor-quality requirements from Project level, and MOS resource constraints (personnel expertise and/or dollars). System engineering theory must be translated into a practice that provides enough structure and standards to serve as guidance, but that retains sufficient flexibility to be tailored to the needs and constraints of a particular MOS or Project. We describe a detailed, scenario-based process for requirements development. Identifying a set of attributes for high quality requirements, we show how the portions of the process address many of those attributes. We also find that the basic process steps are robust, and can be effective even in challenging Project environments.
A Quantitative Study of Global Software Development Teams, Requirements, and Software Projects
ERIC Educational Resources Information Center
Parker, Linda L.
2016-01-01
The study explored the relationship between global software development teams, effective software requirements, and stakeholders' perception of successful software development projects within the field of information technology management. It examined the critical relationship between Global Software Development (GSD) teams creating effective…
Astronomy sortie missions definition study. Volume 4: Program development requirements
NASA Technical Reports Server (NTRS)
1972-01-01
Program development requirements for the selected Astronomy Sortie Missions concept were generated and are presented in four parts as follows: (1)the gross planning requirements that must be considered in subsequent phases of the project; (2)the schedules and logic networks for the design, development, and operation of the overall project; (3)the supporting research and technology required to support the project; and (4)the work breakdown data, from which cost data will be generated. Data reported in each part includes the appropriate rationale with explanations of the guidelines and assumptions that were used in the analyses and estimates.
South African CSP projects under the REIPPP programme - Requirements, challenges and opportunities
NASA Astrophysics Data System (ADS)
Relancio, Javier; Cuellar, Alberto; Walker, Gregg; Ettmayr, Chris
2016-05-01
Thus far seven Concentrated Solar Power (CSP) projects have been awarded under the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP), totalling 600MW: one project is in operation, four under construction and two on their way to financial close. This provides an excellent opportunity for analysis of key features of the projects that have contributed to or detracted from the programme's success. The paper draws from Mott MacDonald's involvement as Technical Advisor on the seven CSP projects that have been successful under the REIPPPP to date as well as other global CSP developments. It presents how various programme requirements have affected the implementation of projects, such as the technical requirements, time of day tariff structure, economic development requirements and the renewable energy grid code. The increasingly competitive tariffs offered have encouraged developers to investigate efficiency maximising project configurations and cost saving mechanisms, as well as featuring state of the art technology in their proposals. The paper assesses the role of the project participants (developers, lenders and government) with regards to these innovative technologies and solutions. In our paper we discuss the status of projects and the SA market, analysing the main challenges and opportunities that in turn have influenced various aspects such as technology choice, operational regimes and supply chain arrangements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
MCGREW, D.L.
2001-10-31
This Requirements Verification Report provides the traceability of how Project W-314 fulfilled the Project Development Specification requirements for the AN Farm to 200E Waste Transfer System Upgrade package.
24 CFR 1003.302 - Project specific threshold requirements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project specific threshold requirements. 1003.302 Section 1003.302 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY...
24 CFR 1003.302 - Project specific threshold requirements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project specific threshold requirements. 1003.302 Section 1003.302 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY...
24 CFR 1003.302 - Project specific threshold requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Project specific threshold requirements. 1003.302 Section 1003.302 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY...
24 CFR 1003.302 - Project specific threshold requirements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project specific threshold requirements. 1003.302 Section 1003.302 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY...
Manned Spacecraft Requirements for Materials and Processes
NASA Technical Reports Server (NTRS)
Vaughn, Timothy P.
2006-01-01
A major cause of project failure can be attributed to an emphasized focus on end products and inadequate attention to resolving development risks during the initial phases of a project. The initial phases of a project, which we will call the "study period", are critical to determining project scope and costs, and can make or break most projects. If the requirements are not defined adequately, how can the scope be adequately determined, also how can the costs of the entire project be effectively estimated, and how can the risk of project success be accurately assessed? Using the proper material specifications and standards and incorporating these specifications and standards in the design process should be considered inherently crucial to the technical success of a project as just as importantly, crucial to the cost and schedule success. This paper will intertwine several important aspects or considerations for project success: 1) Characteristics of a "Good Material Requirement"; 2) Linking material requirements to the implementation of "Design for Manufacturing"; techniques and 3) The importance of decomposing materials requirements during the study phase/development phase to mitigate project risk for the maturation of technologies before the building of hardware.
Intentionally Short-Range Communications (ISRC) exploratory development plan
NASA Astrophysics Data System (ADS)
Yen, J.
1992-06-01
This document is an exploratory development plan for the Intentionally Short-Range Communications (ISRC) project. The USMC requirements and project objectives are quantified, then possible solutions identified and developed. Some of these ideas will be attempted to determine the best option(s) satisfying the USMC requirements.
13 CFR 120.860 - Required objectives.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Section 120.860 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Project Economic Development Goals § 120.860 Required objectives. A Project must achieve at least one of the economic development objectives set forth in § 120.861 or § 120.862. ...
NASA Technical Reports Server (NTRS)
Logan, Cory; Maida, James; Goldsby, Michael; Clark, Jim; Wu, Liew; Prenger, Henk
1993-01-01
The Space Station Freedom (SSF) Data Management System (DMS) consists of distributed hardware and software which monitor and control the many onboard systems. Virtual environment and off-the-shelf computer technologies can be used at critical points in project development to aid in objectives and requirements development. Geometric models (images) coupled with off-the-shelf hardware and software technologies were used in The Space Station Mockup and Trainer Facility (SSMTF) Crew Operational Assessment Project. Rapid prototyping is shown to be a valuable tool for operational procedure and system hardware and software requirements development. The project objectives, hardware and software technologies used, data gained, current activities, future development and training objectives shall be discussed. The importance of defining prototyping objectives and staying focused while maintaining schedules are discussed along with project pitfalls.
An Engineering Method of Civil Jet Requirements Validation Based on Requirements Project Principle
NASA Astrophysics Data System (ADS)
Wang, Yue; Gao, Dan; Mao, Xuming
2018-03-01
A method of requirements validation is developed and defined to meet the needs of civil jet requirements validation in product development. Based on requirements project principle, this method will not affect the conventional design elements, and can effectively connect the requirements with design. It realizes the modern civil jet development concept, which is “requirement is the origin, design is the basis”. So far, the method has been successfully applied in civil jet aircraft development in China. Taking takeoff field length as an example, the validation process and the validation method of the requirements are detailed introduced in the study, with the hope of providing the experiences to other civil jet product design.
Integrating a Project Management Approach to E-Business Application Course
ERIC Educational Resources Information Center
Chen, Kuan C.; Chuang, Keh-Wen
2008-01-01
Teaching students project managements requires a hands-on approach. Incorporating project management concepts and processes into a student team Web development project adds a dimension that exposes students to the realities of effective Web development. This paper will describe the project management approach used in a Web development course in…
AgRISTARS: Yield model development/soil moisture. Interface control document
NASA Technical Reports Server (NTRS)
1980-01-01
The interactions and support functions required between the crop Yield Model Development (YMD) Project and Soil Moisture (SM) Project are defined. The requirements for YMD support of SM and vice-versa are outlined. Specific tasks in support of these interfaces are defined for development of support functions.
18 CFR 12.32 - General inspection requirement.
Code of Federal Regulations, 2012 CFR
2012-04-01
... the condition of those project works or in the quality or adequacy of project maintenance... PROJECT WORKS Inspection by Independent Consultant § 12.32 General inspection requirement. In accordance with the procedures in § 12.35, the project works of each development to which this subpart applies...
18 CFR 12.32 - General inspection requirement.
Code of Federal Regulations, 2014 CFR
2014-04-01
... the condition of those project works or in the quality or adequacy of project maintenance... PROJECT WORKS Inspection by Independent Consultant § 12.32 General inspection requirement. In accordance with the procedures in § 12.35, the project works of each development to which this subpart applies...
18 CFR 12.32 - General inspection requirement.
Code of Federal Regulations, 2011 CFR
2011-04-01
... the condition of those project works or in the quality or adequacy of project maintenance... PROJECT WORKS Inspection by Independent Consultant § 12.32 General inspection requirement. In accordance with the procedures in § 12.35, the project works of each development to which this subpart applies...
14 CFR 152.107 - Project eligibility: Airport development.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Project eligibility: Airport development... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.107 Project eligibility: Airport development. (a) Except in the case of approved stage development...
14 CFR 152.107 - Project eligibility: Airport development.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Project eligibility: Airport development... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.107 Project eligibility: Airport development. (a) Except in the case of approved stage development...
14 CFR 152.107 - Project eligibility: Airport development.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Project eligibility: Airport development... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.107 Project eligibility: Airport development. (a) Except in the case of approved stage development...
Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project
NASA Astrophysics Data System (ADS)
Sanders, Gary H.
2008-07-01
TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.
Advanced solar dynamic space power systems perspectives, requirements and technology needs
NASA Technical Reports Server (NTRS)
Dustin, M. O.; Savino, J. M.; Lacy, D. E.; Migra, R. P.; Juhasz, A. J.; Coles, C. E.
1986-01-01
Projected NASA, Civil, Commercial, and Military missions will require space power systems of increased versatility and power levels. The Advanced Solar Dynamic (ASD) Power systems offer the potential for efficient, lightweight, survivable, relatively compact, long-lived space power systems applicable to a wide range of power levels (3 to 300 kWe), and a wide variety of orbits. The successful development of these systems could satisfy the power needs for a wide variety of these projected missions. Thus, the NASA Lewis Research Center has embarked upon an aggressive ASD reserach project under the direction of NASA's Office of Aeronautics and Space Technology (DAST). The project is being implemented through a combination of in-house and contracted efforts. Key elements of this project are missions analysis to determine the power systems requirements, systems analysis to identify the most attractive ASD power systems to meet these requirements, and to guide the technology development efforts, and technology development of key components.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-28
... project development is done in accordance with State laws and HUD requirements. The forms are prepared by a general contractor constructing a public housing development under the conventional bid method in... work for project development is done in accordance with State laws and HUD requirements. The forms are...
Vadnais, Carolyn; Stensaas, Gregory
2014-01-01
Under the National Land Imaging Requirements (NLIR) Project, the U.S. Geological Survey (USGS) is developing a functional capability to obtain, characterize, manage, maintain and prioritize all Earth observing (EO) land remote sensing user requirements. The goal is a better understanding of community needs that can be supported with land remote sensing resources, and a means to match needs with appropriate solutions in an effective and efficient way. The NLIR Project is composed of two components. The first component is focused on the development of the Earth Observation Requirements Evaluation System (EORES) to capture, store and analyze user requirements, whereas, the second component is the mechanism and processes to elicit and document the user requirements that will populate the EORES. To develop the second component, the requirements elicitation methodology was exercised and refined through a pilot project conducted from June to September 2013. The pilot project focused specifically on applications and user requirements for moderate resolution imagery (5–120 meter resolution) as the test case for requirements development. The purpose of this summary report is to provide a high-level overview of the requirements elicitation process that was exercised through the pilot project and an early analysis of the moderate resolution imaging user requirements acquired to date to support ongoing USGS sustainable land imaging study needs. The pilot project engaged a limited set of Federal Government users from the operational and research communities and therefore the information captured represents only a subset of all land imaging user requirements. However, based on a comparison of results, trends, and analysis, the pilot captured a strong baseline of typical applications areas and user needs for moderate resolution imagery. Because these results are preliminary and represent only a sample of users and application areas, the information from this report should only be used to indicate general user needs for the applications covered. Users of the information are cautioned that use of specific numeric results may be inappropriate without additional research. Any information used or cited from this report should specifically be cited as preliminary findings.
Code of Federal Regulations, 2010 CFR
2010-01-01
....12 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PUBLIC WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects § 305.12 Project sign. The... the Federal government is participating in the Project. The EDA regional office will provide mandatory...
24 CFR 290.11 - Notification requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., HUD acquires a project. (c) Methods of notification—(1) To tenants. Pre-disposition notification will... URBAN DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.11 Notification requirements. (a) In general...
The Development of Project Orion Ground Safety Requirements
NASA Technical Reports Server (NTRS)
Kirkpatrick, Paul; Condzella, Bill; Williams, Jeff
2011-01-01
In spite of a very compressed schedule, Project Orion's AFT safety team was able to pull together a comprehensive set of ground safety requirements using existing requirements and subject matter experts. These requirements will serve as the basis for the design of GSE and ground operations. Using the above lessons as a roadmap, new Projects can produce the same results. A rigorous set of ground safety requirements is required to assure ground support equipment (GSE) and associated flight hardware ground operations are conducted safety
Change management methodologies trained for automotive infotainment projects
NASA Astrophysics Data System (ADS)
Prostean, G.; Volker, S.; Hutanu, A.
2017-01-01
An Automotive Electronic Control Units (ECU) development project embedded within a car Environment is constantly under attack of a continuous flow of modifications of specifications throughout the life cycle. Root causes for those modifications are for instance simply software or hardware implementation errors or requirement changes to satisfy the forthcoming demands of the market to ensure the later commercial success. It is unavoidable that from the very beginning until the end of the project “requirement changes” will “expose” the agreed objectives defined by contract specifications, which are product features, budget, schedule and quality. The key discussions will focus upon an automotive radio-navigation (infotainment) unit, which challenges aftermarket devises such as smart phones. This competition stresses especially current used automotive development processes, which are fit into a 4 Year car development (introduction) cycle against a one-year update cycle of a smart phone. The research will focus the investigation of possible impacts of changes during all phases of the project: the Concept-Validation, Development and Debugging-Phase. Building a thorough understanding of prospective threats is of paramount importance in order to establish the adequate project management process to handle requirement changes. Personal automotive development experiences and Literature review of change- and configuration management software development methodologies led the authors to new conceptual models, which integrates into the structure of traditional development models used in automotive projects, more concretely of radio-navigation projects.
24 CFR 290.11 - Notification requirements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... URBAN DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.11 Notification requirements. (a) In general...
24 CFR 290.11 - Notification requirements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... URBAN DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.11 Notification requirements. (a) In general...
24 CFR 290.11 - Notification requirements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... URBAN DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.11 Notification requirements. (a) In general...
24 CFR 290.7 - Occupancy requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.7 Occupancy requirements. (a) Multifamily housing project that is HUD-owned or for which HUD is mortgagee-in-possession. Occupancy in a multifamily...
24 CFR 290.7 - Occupancy requirements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... URBAN DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.7 Occupancy requirements. (a) Multifamily housing project that is HUD-owned or for which HUD is mortgagee-in-possession. Occupancy in a multifamily...
24 CFR 290.7 - Occupancy requirements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... URBAN DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.7 Occupancy requirements. (a) Multifamily housing project that is HUD-owned or for which HUD is mortgagee-in-possession. Occupancy in a multifamily...
24 CFR 290.7 - Occupancy requirements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... URBAN DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.7 Occupancy requirements. (a) Multifamily housing project that is HUD-owned or for which HUD is mortgagee-in-possession. Occupancy in a multifamily...
Quality Assurance Project Plan Development Tool
This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bonnal, P.; Féral, B.; Kershaw, K.
Particle accelerator projects share many characteristics with industrial projects. However, experience has shown that best practice of industrial project management is not always well suited to particle accelerator projects. Major differences include the number and complexity of technologies involved, the importance of collaborative work, development phases that can last more than a decade, and the importance of telerobotics and remote handling to address future preventive and corrective maintenance requirements due to induced radioactivity, to cite just a few. The openSE framework it is a systems engineering and project management framework specifically designed for scientific facilities’ systems and equipment studies andmore » development projects. Best practices in project management, in systems and requirements engineering, in telerobotics and remote handling and in radiation safety management were used as sources of inspiration, together with analysis of current practices surveyed at CERN, GSI and ESS.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
BEVINS, R.R.
This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated duringmore » the second phase of the W314 Project to cover the second phase of the project's scope.« less
14 CFR 1216.305 - Criteria for actions requiring environmental assessments.
Code of Federal Regulations, 2012 CFR
2012-01-01
... assessment are: (1) Specific spacecraft development and flight projects in space science. (2) Specific spacecraft development and flight projects in space and terrestrial applications. (3) Specific experimental... spacecraft development and flight projects. (2) R&D activities in space and terrestrial applications (e.g...
LAN Configuration and Analysis: Projects for the Data Communications and Networking Course
ERIC Educational Resources Information Center
Chen, Fang; Brabston, Mary
2011-01-01
We implemented two local area network (LAN) projects in our introductory data communications and networking course. The first project required students to develop a LAN from scratch for a small imaginary organization. The second project required student groups to analyze a LAN for a real world small organization. By allowing students to apply what…
Flat-plate solar array project. Volume 6: Engineering sciences and reliability
NASA Technical Reports Server (NTRS)
Ross, R. G., Jr.; Smokler, M. I.
1986-01-01
The Flat-Plate Solar Array (FSA) Project activities directed at developing the engineering technology base required to achieve modules that meet the functional, safety, and reliability requirements of large scale terrestrial photovoltaic systems applications are reported. These activities included: (1) development of functional, safety, and reliability requirements for such applications; (2) development of the engineering analytical approaches, test techniques, and design solutions required to meet the requirements; (3) synthesis and procurement of candidate designs for test and evaluation; and (4) performance of extensive testing, evaluation, and failure analysis of define design shortfalls and, thus, areas requiring additional research and development. A summary of the approach and technical outcome of these activities are provided along with a complete bibliography of the published documentation covering the detailed accomplishments and technologies developed.
NASA Technical Reports Server (NTRS)
Griesel, Martha Ann
1988-01-01
Several Laboratory software development projects that followed nonstandard development processes, which were hybrids of incremental development and prototyping, are being studied. Factors in the project environment leading to the decision to use a nonstandard development process and affecting its success are analyzed. A simple characterization of project environment based on this analysis is proposed, together with software development approaches which have been found effective for each category. These approaches include both documentation and review requirements.
18 CFR 12.32 - General inspection requirement.
Code of Federal Regulations, 2010 CFR
2010-04-01
... COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS Inspection by Independent Consultant § 12.32 General inspection requirement. In accordance with the procedures in § 12.35, the project works of each development to which this subpart applies...
Impact of Requirements Quality on Project Success or Failure
NASA Astrophysics Data System (ADS)
Tamai, Tetsuo; Kamata, Mayumi Itakura
We are interested in the relationship between the quality of the requirements specifications for software projects and the subsequent outcome of the projects. To examine this relationship, we investigated 32 projects started and completed between 2003 and 2005 by the software development division of a large company in Tokyo. The company has collected reliable data on requirements specification quality, as evaluated by software quality assurance teams, and overall project performance data relating to cost and time overruns. The data for requirements specification quality were first converted into a multiple-dimensional space, with each dimension corresponding to an item of the recommended structure for software requirements specifications (SRS) defined in IEEE Std. 830-1998. We applied various statistical analysis methods to the SRS quality data and project outcomes.
A Process Research Framework: The International Process Research Consortium
2006-12-01
projects ? 52 Theme P | IPRC Framework 5 P-30 How should a process for collaborative development be formulated? The development at different companies...requires some process for the actual collaboration . How should it be handled? P-31 How do we handle change? Requirements change during development ...source projects employ a single-site development model in which there is no large community of testers but rather a single-site small group
Integrating MBSE into Ongoing Projects: Requirements Validation and Test Planning for the ISS SAFER
NASA Technical Reports Server (NTRS)
Anderson, Herbert A.; Williams, Antony; Pierce, Gregory
2016-01-01
The International Space Station (ISS) Simplified Aid for Extra Vehicular Activity (EVA) Rescue (SAFER) is the spacewalking astronaut's final safety measure against separating from the ISS and being unable to return safely. Since the late 1990s, the SAFER has been a standard element of the spacewalking astronaut's equipment. The ISS SAFER project was chartered to develop a new block of SAFER units using a highly similar design to the legacy SAFER (known as the USA SAFER). An on-orbit test module was also included in the project to enable periodic maintenance/propulsion system checkout on the ISS SAFER. On the ISS SAFER project, model-based systems engineering (MBSE) was not the initial systems engineering (SE) approach, given the volume of heritage systems engineering and integration (SE&I) products. The initial emphasis was ensuring traceability to ISS program standards as well as to legacy USA SAFER requirements. The requirements management capabilities of the Cradle systems engineering tool were to be utilized to that end. During development, however, MBSE approaches were applied selectively to address specific challenges in requirements validation and test and verification (T&V) planning, which provided measurable efficiencies to the project. From an MBSE perspective, ISS SAFER development presented a challenge and an opportunity. Addressing the challenge first, the project was tasked to use the original USA SAFER operational and design requirements baseline, with a number of additional ISS program requirements to address evolving certification expectations for systems operating on the ISS. Additionally, a need to redesign the ISS SAFER avionics architecture resulted in a set of changes to the design requirements baseline. Finally, the project added an entirely new functionality for on-orbit maintenance. After initial requirements integration, the system requirements count was approaching 1000, which represented a growth of 4x over the original USA SAFER system. This presented the challenge - How to confirm that this new set of requirements set would result in the creation of the desired capability.
The Systems Engineering Process for Human Support Technology Development
NASA Technical Reports Server (NTRS)
Jones, Harry
2005-01-01
Systems engineering is designing and optimizing systems. This paper reviews the systems engineering process and indicates how it can be applied in the development of advanced human support systems. Systems engineering develops the performance requirements, subsystem specifications, and detailed designs needed to construct a desired system. Systems design is difficult, requiring both art and science and balancing human and technical considerations. The essential systems engineering activity is trading off and compromising between competing objectives such as performance and cost, schedule and risk. Systems engineering is not a complete independent process. It usually supports a system development project. This review emphasizes the NASA project management process as described in NASA Procedural Requirement (NPR) 7120.5B. The process is a top down phased approach that includes the most fundamental activities of systems engineering - requirements definition, systems analysis, and design. NPR 7120.5B also requires projects to perform the engineering analyses needed to ensure that the system will operate correctly with regard to reliability, safety, risk, cost, and human factors. We review the system development project process, the standard systems engineering design methodology, and some of the specialized systems analysis techniques. We will discuss how they could apply to advanced human support systems development. The purpose of advanced systems development is not directly to supply human space flight hardware, but rather to provide superior candidate systems that will be selected for implementation by future missions. The most direct application of systems engineering is in guiding the development of prototype and flight experiment hardware. However, anticipatory systems engineering of possible future flight systems would be useful in identifying the most promising development projects.
Shared mission operations concept
NASA Technical Reports Server (NTRS)
Spradlin, Gary L.; Rudd, Richard P.; Linick, Susan H.
1994-01-01
Historically, new JPL flight projects have developed a Mission Operations System (MOS) as unique as their spacecraft, and have utilized a mission-dedicated staff to monitor and control the spacecraft through the MOS. NASA budgetary pressures to reduce mission operations costs have led to the development and reliance on multimission ground system capabilities. The use of these multimission capabilities has not eliminated an ongoing requirement for a nucleus of personnel familiar with a given spacecraft and its mission to perform mission-dedicated operations. The high cost of skilled personnel required to support projects with diverse mission objectives has the potential for significant reduction through shared mission operations among mission-compatible projects. Shared mission operations are feasible if: (1) the missions do not conflict with one another in terms of peak activity periods, (2) a unique MOS is not required, and (3) there is sufficient similarity in the mission profiles so that greatly different skills would not be required to support each mission. This paper will further develop this shared mission operations concept. We will illustrate how a Discovery-class mission would enter a 'partner' relationship with the Voyager Project, and can minimize MOS development and operations costs by early and careful consideration of mission operations requirements.
Computer Lessons for Written Harmony. Final Project Report.
ERIC Educational Resources Information Center
Arenson, Michael A.
This project was created to help music students in their development of part-writing and harmonization skills, requirements for college-level music study. It was developed and programmed by members of the Instructional Technology Center and Department of Music at the University of Delaware. The software developed during this project provides…
An Approach for Implementation of Project Management Information Systems
NASA Astrophysics Data System (ADS)
Běrziša, Solvita; Grabis, Jānis
Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.
Leveraging object-oriented development at Ames
NASA Technical Reports Server (NTRS)
Wenneson, Greg; Connell, John
1994-01-01
This paper presents lessons learned by the Software Engineering Process Group (SEPG) from results of supporting two projects at NASA Ames using an Object Oriented Rapid Prototyping (OORP) approach supported by a full featured visual development environment. Supplemental lessons learned from a large project in progress and a requirements definition are also incorporated. The paper demonstrates how productivity gains can be made by leveraging the developer with a rich development environment, correct and early requirements definition using rapid prototyping, and earlier and better effort estimation and software sizing through object-oriented methods and metrics. Although the individual elements of OO methods, RP approach and OO metrics had been used on other separate projects, the reported projects were the first integrated usage supported by a rich development environment. Overall the approach used was twice as productive (measured by hours per OO Unit) as a C++ development.
NASA Technical Reports Server (NTRS)
Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)
1998-01-01
A key aspect of NASA's new Strategic Management System is improving the way we plan, approve, execute and evaluate our programs and projects. To this end, NASA has developed the NASA Program and Project Management processes and Requirements-NASA Procedures and Guidelines (NPG) 7120.5A, which formally documents the "Provide Aerospace Products and Capabilities" crosscutting process, and defines the processes and requirements that are responsive to the Program/Project Management-NPD 7120.4A. The Program/Project Management-NPD 7120.4A, issued November 14, 1996, provides the policy for managing programs and projects in a new way that is aligned with the new NASA environment. An Agencywide team has spent thousands of hours developing the NASA Program and Project Management Processes and Requirements-NPG 7120.5A. We have created significant flexibility, authority and discretion for the program and project managers to exercise and carry out their duties, and have delegated the responsibility and the accountability for their programs and projects.
Impact of agile methodologies on team capacity in automotive radio-navigation projects
NASA Astrophysics Data System (ADS)
Prostean, G.; Hutanu, A.; Volker, S.
2017-01-01
The development processes used in automotive radio-navigation projects are constantly under adaption pressure. While the software development models are based on automotive production processes, the integration of peripheral components into an automotive system will trigger a high number of requirement modifications. The use of traditional development models in automotive industry will bring team’s development capacity to its boundaries. The root cause lays in the inflexibility of actual processes and their adaption limits. This paper addresses a new project management approach for the development of radio-navigation projects. The understanding of weaknesses of current used models helped us in development and integration of agile methodologies in traditional development model structure. In the first part we focus on the change management methods to reduce request for change inflow. Established change management risk analysis processes enables the project management to judge the impact of a requirement change and also gives time to the project to implement some changes. However, in big automotive radio-navigation projects the saved time is not enough to implement the large amount of changes, which are submitted to the project. In the second phase of this paper we focus on increasing team capacity by integrating at critical project phases agile methodologies into the used traditional model. The overall objective of this paper is to prove the need of process adaption in order to solve project team capacity bottlenecks.
SH-2F LAMPS Instructional Systems Development: Phase II. Final Report.
ERIC Educational Resources Information Center
Gibbons, Andrew S.; Hymes, Jonah P.
This project was one of four aircrew training development projects in a continuing study of the methodology, effectiveness, and resource requirements of the Instructional Systems Development (ISD) process. This report covers the Phase II activities of a two-phase project for the development of aircrew training for SH-2F anti-submarine warfare…
Requirements, Verification, and Compliance (RVC) Database Tool
NASA Technical Reports Server (NTRS)
Rainwater, Neil E., II; McDuffee, Patrick B.; Thomas, L. Dale
2001-01-01
This paper describes the development, design, and implementation of the Requirements, Verification, and Compliance (RVC) database used on the International Space Welding Experiment (ISWE) project managed at Marshall Space Flight Center. The RVC is a systems engineer's tool for automating and managing the following information: requirements; requirements traceability; verification requirements; verification planning; verification success criteria; and compliance status. This information normally contained within documents (e.g. specifications, plans) is contained in an electronic database that allows the project team members to access, query, and status the requirements, verification, and compliance information from their individual desktop computers. Using commercial-off-the-shelf (COTS) database software that contains networking capabilities, the RVC was developed not only with cost savings in mind but primarily for the purpose of providing a more efficient and effective automated method of maintaining and distributing the systems engineering information. In addition, the RVC approach provides the systems engineer the capability to develop and tailor various reports containing the requirements, verification, and compliance information that meets the needs of the project team members. The automated approach of the RVC for capturing and distributing the information improves the productivity of the systems engineer by allowing that person to concentrate more on the job of developing good requirements and verification programs and not on the effort of being a "document developer".
ERIC Educational Resources Information Center
Hook, Colin; Ethridge, James
As part of Project IMPACT's efforts to identify and develop procedures for complying with the impact requirements of Public Law 94-482, a case study was made of Illinois Projects in Horticulture. Fourteen horticulture projects in high schools and junior colleges were discovered through a previous study, personal interviews with two University of…
NASA Advanced Refrigerator/Freezer Technology Development Project Overview
NASA Technical Reports Server (NTRS)
Cairelli, J. E.
1995-01-01
NASA Lewis Research Center (LeRC) has recently initiated a three-year project to develop the advanced refrigerator/freezer (R/F) technologies needed to support future life and biomedical sciences space experiments. Refrigerator/freezer laboratory equipment, most of which needs to be developed, is enabling to about 75 percent of the planned space station life and biomedical science experiments. These experiments will require five different classes of equipment; three storage freezers operating at -20 C, -70 C and less than 183 C, a -70 C freeze-dryer, and a cryogenic (less than 183 C) quick/snap freezer. This project is in response to a survey of cooling system technologies, performed by a team of NASA scientists and engineers. The team found that the technologies, required for future R/F systems to support life and biomedical sciences spaceflight experiments, do not exist at an adequate state of development and concluded that a program to develop the advanced R/F technologies is needed. Limitations on spaceflight system size, mass, and power consumption present a significant challenge in developing these systems. This paper presents some background and a description of the Advanced R/F Technology Development Project, project approach and schedule, general description of the R/F systems, and a review of the major R/F equipment requirements.
Use of a structured template to facilitate practice-based learning and improvement projects.
McClain, Elizabeth K; Babbott, Stewart F; Tsue, Terance T; Girod, Douglas A; Clements, Debora; Gilmer, Lisa; Persons, Diane; Unruh, Greg
2012-06-01
The Accreditation Council for Graduate Medical Education (ACGME) requires residency programs to meet and demonstrate outcomes across 6 competencies. Measuring residents' competency in practice-based learning and improvement (PBLI) is particularly challenging. We developed an educational tool to meet ACGME requirements for PBLI. The PBLI template helped programs document quality improvement (QI) projects and supported increased scholarly activity surrounding PBLI learning. We reviewed program requirements for 43 residency and fellowship programs and identified specific PBLI requirements for QI activities. We also examined ACGME Program Information Form responses on PBLI core competency questions surrounding QI projects for program sites visited in 2008-2009. Data were integrated by a multidisciplinary committee to develop a peer-protected PBLI template guiding programs through process, documentation, and evaluation of QI projects. All steps were reviewed and approved through our GME Committee structure. An electronic template, companion checklist, and evaluation form were developed using identified project characteristics to guide programs through the PBLI process and facilitate documentation and evaluation of the process. During a 24 month period, 27 programs have completed PBLI projects, and 15 have reviewed the template with their education committees, but have not initiated projects using the template. The development of the tool generated program leaders' support because the tool enhanced the ability to meet program-specific objectives. The peer-protected status of this document for confidentiality and from discovery has been beneficial for program usage. The document aggregates data on PBLI and QI initiatives, offers opportunities to increase scholarship in QI, and meets the ACGME goal of linking measures to outcomes important to meeting accreditation requirements at the program and institutional level.
Use of a Structured Template to Facilitate Practice-Based Learning and Improvement Projects
McClain, Elizabeth K.; Babbott, Stewart F.; Tsue, Terance T.; Girod, Douglas A.; Clements, Debora; Gilmer, Lisa; Persons, Diane; Unruh, Greg
2012-01-01
Background The Accreditation Council for Graduate Medical Education (ACGME) requires residency programs to meet and demonstrate outcomes across 6 competencies. Measuring residents' competency in practice-based learning and improvement (PBLI) is particularly challenging. Purpose We developed an educational tool to meet ACGME requirements for PBLI. The PBLI template helped programs document quality improvement (QI) projects and supported increased scholarly activity surrounding PBLI learning. Methods We reviewed program requirements for 43 residency and fellowship programs and identified specific PBLI requirements for QI activities. We also examined ACGME Program Information Form responses on PBLI core competency questions surrounding QI projects for program sites visited in 2008–2009. Data were integrated by a multidisciplinary committee to develop a peer-protected PBLI template guiding programs through process, documentation, and evaluation of QI projects. All steps were reviewed and approved through our GME Committee structure. Results An electronic template, companion checklist, and evaluation form were developed using identified project characteristics to guide programs through the PBLI process and facilitate documentation and evaluation of the process. During a 24 month period, 27 programs have completed PBLI projects, and 15 have reviewed the template with their education committees, but have not initiated projects using the template. Discussion The development of the tool generated program leaders' support because the tool enhanced the ability to meet program-specific objectives. The peer-protected status of this document for confidentiality and from discovery has been beneficial for program usage. The document aggregates data on PBLI and QI initiatives, offers opportunities to increase scholarship in QI, and meets the ACGME goal of linking measures to outcomes important to meeting accreditation requirements at the program and institutional level. PMID:23730444
Fertilizer effects on attaining vegetation requirements.
DOT National Transportation Integrated Search
2014-02-01
This project was developed to evaluate the effects of varying the substrate and fertilization regimes on the success of complex warm-season grass and forb seedings on recent roadside construction sites. Re-vegetating construction projects is required...
36 CFR 64.9 - Project costs (State and local projects).
Code of Federal Regulations, 2010 CFR
2010-07-01
... appropriate conveyance. Project-related planning costs outlined in § 64.9(a)(3), may be incurred prior to...) Construction costs associated with developing the right-of-way for recreation use. (3) Project-related planning required for the acquisition, development and use of the abandoned rights-of-way including master planning...
Miranda, Marie Lynn; Silva, Jennifer M.; Overstreet Galeano, M. Alicia; Brown, Jeffrey P.; Campbell, Douglas S.; Coley, Evelyn; Cowan, Christopher S.; Harvell, Dianne; Lassiter, Jenny; Parks, Jerry L.; Sandelé, Wanda
2005-01-01
State government, university, and local health department (LHD) partners collaborated to build the geographic information system (GIS) capacity of 5 LHDs in North Carolina. Project elements included procuring hardware and software, conducting individualized and group training, developing data layers, guiding the project development process, coordinating participation in technical conferences, providing ongoing project consultation, and evaluating project milestones. The project provided health department personnel with the skills and resources required to use sophisticated information management systems, particularly those that address spatial dimensions of public health practice. This capacity-building project helped LHDs incorporate GIS technology into daily operations, resulting in improved time and cost efficiency. Keys to success included (1) methods training rooted in problems specific to the LHD, (2) required project identification by LHD staff with associated timelines for development, (3) ongoing technical support as staff returned to home offices after training, (4) subgrants to LHDs to ease hardware and software resource constraints, (5) networks of relationships among LHDs and other professional GIS users, and (6) senior LHD leadership who supported the professional development activities being undertaken by staff. PMID:16257950
Criteria for Developing a Successful Privatization Project
1989-05-01
conceptualization and planning are required when pursuing privatization projects. In fact, privatization project proponents need to know how to...selection of projects for analysis, methods of acquiring information about these projects, and the analysis framwork . Chapter IV includes the analysis. A...performed an analysis to determine cormion conceptual and creative approaches and lessons learned. This analysis was then used to develop criteria for
Managing System of Systems Requirements with a Requirements Screening Group
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ronald R. Barden
2012-07-01
Figuring out an effective and efficient way to manage not only your Requirement’s Baseline, but also the development of all your individual requirements during a Program’s/Project’s Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration withmore » multiple requirements’ development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.« less
Requirements management for Gemini Observatory: a small organization with big development projects
NASA Astrophysics Data System (ADS)
Close, Madeline; Serio, Andrew; Cordova, Martin; Hardie, Kayla
2016-08-01
Gemini Observatory is an astronomical observatory operating two premier 8m-class telescopes, one in each hemisphere. As an operational facility, a majority of Gemini's resources are spent on operations however the observatory undertakes major development projects as well. Current projects include new facility science instruments, an operational paradigm shift to full remote operations, and new operations tools for planning, configuration and change control. Three years ago, Gemini determined that a specialized requirements management tool was needed. Over the next year, the Gemini Systems Engineering Group investigated several tools, selected one for a trial period and configured it for use. Configuration activities including definition of systems engineering processes, development of a requirements framework, and assignment of project roles to tool roles. Test projects were implemented in the tool. At the conclusion of the trial, the group determined that the Gemini could meet its requirements management needs without use of a specialized requirements management tool, and the group identified a number of lessons learned which are described in the last major section of this paper. These lessons learned include how to conduct an organizational needs analysis prior to pursuing a tool; caveats concerning tool criteria and the selection process; the prerequisites and sequence of activities necessary to achieve an optimum configuration of the tool; the need for adequate staff resources and staff training; and a special note regarding organizations in transition and archiving of requirements.
ERIC Educational Resources Information Center
Berghella, Tina; Molenaar, John; Wyse, Linda
2006-01-01
This report examines the extent and nature of professional development required to meet the current and future needs of Workplace English Language and Literacy Programme practitioners. While the working environment for such practitioners is becoming more complex, with greater demands on them to have industry knowledge and project management…
Phase C/D program development plan. Volume 1: Program plan
NASA Technical Reports Server (NTRS)
1971-01-01
The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.
NASA Technical Reports Server (NTRS)
Dickinson, William B.
1995-01-01
An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.
A Review of NASA's Radiation-Hardened Electronics for Space Environments Project
NASA Technical Reports Server (NTRS)
Keys, Andrew S.; Adams, James H.; Patrick, Marshall C.; Johnson, Michael A.; Cressler, John D.
2008-01-01
NASA's Radiation Hardened Electronics for Space Exploration (RHESE) project develops the advanced technologies required to produce radiation hardened electronics, processors, and devices in support of the requirements of NASA's Constellation program. Over the past year, multiple advancements have been made within each of the RHESE technology development tasks that will facilitate the success of the Constellation program elements. This paper provides a brief review of these advancements, discusses their application to Constellation projects, and addresses the plans for the coming year.
A project management system for the X-29A flight test program
NASA Technical Reports Server (NTRS)
Stewart, J. F.; Bauer, C. A.
1983-01-01
The project-management system developed for NASA's participation in the X-29A aircraft development program is characterized from a theoretical perspective, as an example of a system appropriate to advanced, highly integrated technology projects. System-control theory is applied to the analysis of classical project-management techniques and structures, which are found to be of closed-loop multivariable type; and the effects of increasing project complexity and integration are evaluated. The importance of information flow, sampling frequency, information holding, and delays is stressed. The X-29A system is developed in four stages: establishment of overall objectives and requirements, determination of information processes (block diagrams) definition of personnel functional roles and relationships, and development of a detailed work-breakdown structure. The resulting system is shown to require a greater information flow to management than conventional methods. Sample block diagrams are provided.
Toward the Decision Tree for Inferring Requirements Maturation Types
NASA Astrophysics Data System (ADS)
Nakatani, Takako; Kondo, Narihito; Shirogane, Junko; Kaiya, Haruhiko; Hori, Shozo; Katamine, Keiichi
Requirements are elicited step by step during the requirements engineering (RE) process. However, some types of requirements are elicited completely after the scheduled requirements elicitation process is finished. Such a situation is regarded as problematic situation. In our study, the difficulties of eliciting various kinds of requirements is observed by components. We refer to the components as observation targets (OTs) and introduce the word “Requirements maturation.” It means when and how requirements are elicited completely in the project. The requirements maturation is discussed on physical and logical OTs. OTs Viewed from a logical viewpoint are called logical OTs, e.g. quality requirements. The requirements of physical OTs, e.g., modules, components, subsystems, etc., includes functional and non-functional requirements. They are influenced by their requesters' environmental changes, as well as developers' technical changes. In order to infer the requirements maturation period of each OT, we need to know how much these factors influence the OTs' requirements maturation. According to the observation of actual past projects, we defined the PRINCE (Pre Requirements Intelligence Net Consideration and Evaluation) model. It aims to guide developers in their observation of the requirements maturation of OTs. We quantitatively analyzed the actual cases with their requirements elicitation process and extracted essential factors that influence the requirements maturation. The results of interviews of project managers are analyzed by WEKA, a data mining system, from which the decision tree was derived. This paper introduces the PRINCE model and the category of logical OTs to be observed. The decision tree that helps developers infer the maturation type of an OT is also described. We evaluate the tree through real projects and discuss its ability to infer the requirements maturation types.
LHCb migration from Subversion to Git
NASA Astrophysics Data System (ADS)
Clemencic, M.; Couturier, B.; Closier, J.; Cattaneo, M.
2017-10-01
Due to user demand and to support new development workflows based on code review and multiple development streams, LHCb decided to port the source code management from Subversion to Git, using the CERN GitLab hosting service. Although tools exist for this kind of migration, LHCb specificities and development models required careful planning of the migration, development of migration tools, changes to the development model, and redefinition of the release procedures. Moreover we had to support a hybrid situation with some software projects hosted in Git and others still in Subversion, or even branches of one projects hosted in different systems. We present the way we addressed the special LHCb requirements, the technical details of migrating large non standard Subversion repositories, and how we managed to smoothly migrate the software projects following the schedule of each project manager.
DOE Office of Scientific and Technical Information (OSTI.GOV)
BEVINS, R.R.
This document has been updated during the definitive design portion of the first phase of the W-314 Project to capture additional software requirements and is planned to be updated during the second phase of the W-314 Project to cover the second phase of the Project's scope. The objective is to provide requirement traceability by recording the analysis/basis for the functional descriptions of the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operationsmore » input or engineering judgment.« less
Novel High Efficient Organic Photovoltaic Materials: Final Summary of Research
NASA Technical Reports Server (NTRS)
Sun, Sam
2002-01-01
The objectives and goals of this project were to investigate and develop high efficient, lightweight, and cost effective materials for potential photovoltaic applications, such as solar energy conversion or photo detector devices. Specifically, as described in the original project proposal, the target material to be developed was a block copolymer system containing an electron donating (or p-type) conjugated polymer block coupled to an electron withdrawing (or n-type) conjugated polymer block through a non-conjugated bridge unit. Due to several special requirements of the targeted block copolymer systems, such as electron donating and withdrawing substituents, conjugated block structures, processing requirement, stability requirement, size controllability, phase separation and self ordering requirement, etc., many traditional or commonly used block copolymer synthetic schemes are not suitable for this system. Therefore, the investigation and development of applicable and effective synthetic protocols became the most critical and challenging part of this project. During the entire project period, and despite the lack of a proposed synthetic polymer postdoctoral research associate due to severe shortage of qualified personnel in the field, several important accomplishments were achieved in this project and are briefly listed and elaborated. A more detailed research and experimental data is listed in the Appendix.
NASA Technical Reports Server (NTRS)
Upchurch, Christopher
2011-01-01
The project, being the development of resource management applications, consisted entirely of my own effort. From deliverable requirements provided by my mentor, and some functional requirement additions generated through design reviews, It was my responsibility to implement the requested features as well as possible, given the resources available. For the most part development work consisted of database programming and functional testing using real resource data. Additional projects I worked on included some firing room console training, configuring the new NE-A microcontroller development lab network, mentoring high school CubeSat students, and managing the NE interns' component of the mentor appreciation ceremony.
End effector monitoring system: An illustrated case of operational prototyping
NASA Technical Reports Server (NTRS)
Malin, Jane T.; Land, Sherry A.; Thronesbery, Carroll
1994-01-01
Operational prototyping is introduced to help developers apply software innovations to real-world problems, to help users articulate requirements, and to help develop more usable software. Operational prototyping has been applied to an expert system development project. The expert system supports fault detection and management during grappling operations of the Space Shuttle payload bay arm. The dynamic exchanges among operational prototyping team members are illustrated in a specific prototyping session. We discuss the requirements for operational prototyping technology, types of projects for which operational prototyping is best suited and when it should be applied to those projects.
Challenges to achieving sustainable community health development within a donor aid business model.
Ashwell, Helen; Barclay, Lesley
2010-06-01
This paper explores the paradox of donor aid being delivered through a business model through a case study in Papua New Guinea. A retrospective review of project implementation and an outcome evaluation provided an opportunity to examine the long-term results and sustainability of a large project. Analysis was informed by data collected from 175 interviews (national, provincial, district and village), 93 community discussions and observations across 10 provinces. Problems with the business model of delivering aid were evident from implementation data and in an evaluation conducted two years after project completion (2006). Compounding the business model effect were challenges of over-ambitious project goals with limited flexibility to adapt to changing circumstances, a donor payment system requiring short-term productivity and excessive reporting requirements. An overly ambitious project design, donor dominance within the business model and limited local counterpart capacity created problems in the community initiatives component of the project. Contractual pressures can negatively influence long-term outcomes that require development of local leadership and capacity. Future planning for donor project designs needs to be flexible, smaller in scope and have a longer timeframe of seven to 10 years. Donor-funded projects need to be sufficiently flexible to apply proven principles of community development, build local ownership and allow adequate time to build counterpart knowledge and skills.
Federal Aviation Administration Small Business Innovation Research 5- Year Project Summaries
1990-02-01
Completed Project: The project’s two primary objectives were to further develop the technology base for the Slaved Tandem Freewing (STF) Airplance and...margins than conventional airplances , and can meet all applicable airworthiness requirements. Adaitionally, basic design parameters were developed
13 CFR 305.5 - Project administration by District Organization.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Project administration by District Organization. 305.5 Section 305.5 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PUBLIC WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects...
13 CFR 305.9 - Project phasing and Investment disbursement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Project phasing and Investment disbursement. 305.9 Section 305.9 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PUBLIC WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects...
How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists
NASA Technical Reports Server (NTRS)
Kea, Howard
2011-01-01
The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.
24 CFR 232.902 - Eligible project.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...
24 CFR 232.902 - Eligible project.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...
24 CFR 232.902 - Eligible project.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...
24 CFR 232.902 - Eligible project.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...
2006-05-01
a significant design project that requires development of a large scale software project . A distinct shortcoming of Purdue ECE...18-540: Rapid Prototyping of Computer Systems This is a project -oriented course which will deal with all four aspects of project development ; the...instructors, will develop specifications for a mobile computer to assist in inspection and maintenance. The application will be partitioned
ERIC Educational Resources Information Center
Cheney-Stern, Marilyn R.; Phelps, L. Allen
As part of Project IMPACT's efforts to develop procedures for complying with the impact requirements of Public Law 94-482, a case study was made of the Illinois Occupational Curriculum Project (IOCP). The top-down study traced the IOCP from its developers to its users and documented measurable changes in the 1971 versus the 1979 curriculum…
Code of Federal Regulations, 2013 CFR
2013-04-01
... recipient with a framework for financially underwriting and selecting CDBG-assisted economic development... out the economic development project. This is to ensure that time and effort is not wasted on... review the economic development project to ensure that, to the extent practicable, CDBG funds will not be...
Code of Federal Regulations, 2014 CFR
2014-04-01
... recipient with a framework for financially underwriting and selecting CDBG-assisted economic development... out the economic development project. This is to ensure that time and effort is not wasted on... review the economic development project to ensure that, to the extent practicable, CDBG funds will not be...
Code of Federal Regulations, 2012 CFR
2012-04-01
... recipient with a framework for financially underwriting and selecting CDBG-assisted economic development... out the economic development project. This is to ensure that time and effort is not wasted on... review the economic development project to ensure that, to the extent practicable, CDBG funds will not be...
Code of Federal Regulations, 2011 CFR
2011-04-01
... recipient with a framework for financially underwriting and selecting CDBG-assisted economic development... out the economic development project. This is to ensure that time and effort is not wasted on... review the economic development project to ensure that, to the extent practicable, CDBG funds will not be...
Process Acceptance and Adoption by IT Software Project Practitioners
ERIC Educational Resources Information Center
Guardado, Deana R.
2012-01-01
This study addresses the question of what factors determine acceptance and adoption of processes in the context of Information Technology (IT) software development projects. This specific context was selected because processes required for managing software development projects are less prescriptive than in other, more straightforward, IT…
24 CFR 266.200 - Eligible projects.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...
24 CFR 266.200 - Eligible projects.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...
24 CFR 266.200 - Eligible projects.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...
24 CFR 266.200 - Eligible projects.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...
Guidebook to Geothermal Finance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Salmon, J. P.; Meurice, J.; Wobus, N.
This guidebook is intended to facilitate further investment in conventional geothermal projects in the United States. It includes a brief primer on geothermal technology and the most relevant policies related to geothermal project development. The trends in geothermal project finance are the focus of this tool, relying heavily on interviews with leaders in the field of geothermal project finance. Using the information provided, developers and investors may innovate in new ways, developing partnerships that match investors' risk tolerance with the capital requirements of geothermal projects in this dynamic and evolving marketplace.
A CMMI-based approach for medical software project life cycle study.
Chen, Jui-Jen; Su, Wu-Chen; Wang, Pei-Wen; Yen, Hung-Chi
2013-01-01
In terms of medical techniques, Taiwan has gained international recognition in recent years. However, the medical information system industry in Taiwan is still at a developing stage compared with the software industries in other nations. In addition, systematic development processes are indispensable elements of software development. They can help developers increase their productivity and efficiency and also avoid unnecessary risks arising during the development process. Thus, this paper presents an application of Light-Weight Capability Maturity Model Integration (LW-CMMI) to Chang Gung Medical Research Project (CMRP) in the Nuclear medicine field. This application was intended to integrate user requirements, system design and testing of software development processes into three layers (Domain, Concept and Instance) model. Then, expressing in structural System Modeling Language (SysML) diagrams and converts part of the manual effort necessary for project management maintenance into computational effort, for example: (semi-) automatic delivery of traceability management. In this application, it supports establishing artifacts of "requirement specification document", "project execution plan document", "system design document" and "system test document", and can deliver a prototype of lightweight project management tool on the Nuclear Medicine software project. The results of this application can be a reference for other medical institutions in developing medical information systems and support of project management to achieve the aim of patient safety.
Smart gun technology requirements preliminary report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weiss, D.R.; Brandt, D.J.; Tweet, K.D.
Goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user from firing a law enforcement officer`s firearm by implementing user-recognizing-and-authorizing surety technologies. This project is funded by the National Institute of Justice. This document reports the projects first objective: to find and document the requirements for a user-recognizing-and-authorizing firearm technology that law enforcement officers will value. This report details the problem of firearm takeaways in law enforcement, the methodology used to develop the law enforcement officers` requirements, and the requirements themselves.
Bevelhimer, Mark S.; DeRolph, Christopher R.; Schramm, Michael P.
2016-06-06
Uncertainty about environmental mitigation needs at existing and proposed hydropower projects makes it difficult for stakeholders to minimize environmental impacts. Hydropower developers and operators desire tools to better anticipate mitigation requirements, while natural resource managers and regulators need tools to evaluate different mitigation scenarios and order effective mitigation. Here we sought to examine the feasibility of using a suite of multidisciplinary explanatory variables within a spatially explicit modeling framework to fit predictive models for future environmental mitigation requirements at hydropower projects across the conterminous U.S. Using a database comprised of mitigation requirements from more than 300 hydropower project licenses, wemore » were able to successfully fit models for nearly 50 types of environmental mitigation and to apply the predictive models to a set of more than 500 non-powered dams identified as having hydropower potential. The results demonstrate that mitigation requirements have been a result of a range of factors, from biological and hydrological to political and cultural. Furthermore, project developers can use these models to inform cost projections and design considerations, while regulators can use the models to more quickly identify likely environmental issues and potential solutions, hopefully resulting in more timely and more effective decisions on environmental mitigation.« less
DeRolph, Christopher R; Schramm, Michael P; Bevelhimer, Mark S
2016-10-01
Uncertainty about environmental mitigation needs at existing and proposed hydropower projects makes it difficult for stakeholders to minimize environmental impacts. Hydropower developers and operators desire tools to better anticipate mitigation requirements, while natural resource managers and regulators need tools to evaluate different mitigation scenarios and order effective mitigation. Here we sought to examine the feasibility of using a suite of multi-faceted explanatory variables within a spatially explicit modeling framework to fit predictive models for future environmental mitigation requirements at hydropower projects across the conterminous U.S. Using a database comprised of mitigation requirements from more than 300 hydropower project licenses, we were able to successfully fit models for nearly 50 types of environmental mitigation and to apply the predictive models to a set of more than 500 non-powered dams identified as having hydropower potential. The results demonstrate that mitigation requirements are functions of a range of factors, from biophysical to socio-political. Project developers can use these models to inform cost projections and design considerations, while regulators can use the models to more quickly identify likely environmental issues and potential solutions, hopefully resulting in more timely and more effective decisions on environmental mitigation. Copyright © 2016 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bevelhimer, Mark S.; DeRolph, Christopher R.; Schramm, Michael P.
Uncertainty about environmental mitigation needs at existing and proposed hydropower projects makes it difficult for stakeholders to minimize environmental impacts. Hydropower developers and operators desire tools to better anticipate mitigation requirements, while natural resource managers and regulators need tools to evaluate different mitigation scenarios and order effective mitigation. Here we sought to examine the feasibility of using a suite of multidisciplinary explanatory variables within a spatially explicit modeling framework to fit predictive models for future environmental mitigation requirements at hydropower projects across the conterminous U.S. Using a database comprised of mitigation requirements from more than 300 hydropower project licenses, wemore » were able to successfully fit models for nearly 50 types of environmental mitigation and to apply the predictive models to a set of more than 500 non-powered dams identified as having hydropower potential. The results demonstrate that mitigation requirements have been a result of a range of factors, from biological and hydrological to political and cultural. Furthermore, project developers can use these models to inform cost projections and design considerations, while regulators can use the models to more quickly identify likely environmental issues and potential solutions, hopefully resulting in more timely and more effective decisions on environmental mitigation.« less
UAS Integration in the NAS: Detect and Avoid
NASA Technical Reports Server (NTRS)
Shively, Jay
2018-01-01
This presentation will cover the structure of the unmanned aircraft systems (UAS) integration into the national airspace system (NAS) project (UAS-NAS Project). The talk also details the motivation of the project to help develop standards for a detect-and-avoid (DAA) system, which is required in order to comply with requirements in manned aviation to see-and-avoid other traffic so as to maintain well clear. The presentation covers accomplishments reached by the project in Phase 1 of the research, and touches on the work to be done in Phase 2. The discussion ends with examples of the display work developed as a result of the Phase 1 research.
I-95 Corridor Coalition Project #3 (95-003) : surveillance requirements/technology
DOT National Transportation Integrated Search
1995-06-23
The purpose of this Surveillance Requirements/Technology (SR/T) Project is to develop an : implementation plan for a Corridor-wide traffic and environmental surveillance system using state-of-the-art and cost-effective technologies. To fulfill this p...
Principal Development: Self-Directed Project Efficacy
ERIC Educational Resources Information Center
Piggot-Irvine, Eileen
2011-01-01
The inclusion of self-directed projects as an element within a New Zealand principal development programme was designed to reflect increasing support internationally for such a context-specific "inquiry" approach. The results reported in this article suggest that considerable clarity is required for such projects if they are to realize…
Initiating the 2002 Mars Science Laboratory (MSL) Technology Program
NASA Technical Reports Server (NTRS)
Caffrey, Robert T.; Udomkesmalee, Gabriel; Hayati, Samad A.; Henderson, Rebecca
2004-01-01
The Mars Science Laboratory (MSL) Project is an aggressive mission launching in 2009 to investigate the Martian environment and requires new capabilities that are currently are not available. The MSL Technology Program is developing a wide-range of technologies needed for this Mission and potentially other space missions. The MSL Technology Program reports to both the MSL Project and the Mars Technology Program (MTP). The dual reporting process creates a challenging management situation, but ensures the new technology meets both the specific MSL requirements and the broader Mars Program requirements. MTP is a NASA-wide technology development program managed by JPL and is divided into a Focused Program and a Base Program. The MSL Technology Program is under the focused program and is tightly coupled to MSL's mission milestones and deliverables. The technology budget is separate from the flight Project budget, but the technology's requirements and the development process are tightly coordinated with the Project. The MSL Technology Program combines the proven management techniques of flight projects with the commercial technology management strategies of industry and academia, to create a technology management program that meets the short-term requirements of MSL and the long-term requirements of MTP. This paper examines the initiation of 2002 MSL Technology program. Some of the areas discussed in this paper include technology definition, task selection, technology management, and technology assessment. This paper also provides an update of the 2003 MSL technology program and examines some of the drivers that changed the program from its initiation.
33 CFR 385.24 - Project Management Plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...
33 CFR 385.24 - Project Management Plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...
33 CFR 385.24 - Project Management Plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...
33 CFR 385.24 - Project Management Plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...
33 CFR 385.24 - Project Management Plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...
NASA Technical Reports Server (NTRS)
Dudzinski, Leonard a.; Pencil, Eric J.; Dankanich, John W.
2007-01-01
The In-Space Propulsion Technology Project (ISPT) is currently NASA's sole investment in electric propulsion technologies. This project is managed at NASA Glenn Research Center (GRC) for the NASA Headquarters Science Mission Directorate (SMD). The objective of the electric propulsion project area is to develop near-term and midterm electric propulsion technologies to enhance or enable future NASA science missions while minimizing risk and cost to the end user. Systems analysis activities sponsored by ISPT seek to identify future mission applications in order to quantify mission requirements, as well as develop analytical capability in order to facilitate greater understanding and application of electric propulsion and other propulsion technologies in the ISPT portfolio. These analyses guide technology investments by informing decisions and defining metrics for technology development to meet identified mission requirements. This paper discusses the missions currently being studied for electric propulsion by the ISPT project, and presents the results of recent electric propulsion (EP) mission trades. Recent ISPT systems analysis activities include: an initiative to standardize life qualification methods for various electric propulsion systems in order to retire perceived risk to proposed EP missions; mission analysis to identify EP requirements from Discovery, New Frontiers, and Flagship classes of missions; and an evaluation of system requirements for radioisotope-powered electric propulsion. Progress and early results of these activities is discussed where available.
Thermoelectric Outer Planets Spacecraft (TOPS)
NASA Technical Reports Server (NTRS)
1973-01-01
The research and advanced development work is reported on a ballistic-mode, outer planet spacecraft using radioisotope thermoelectric generator (RTG) power. The Thermoelectric Outer Planet Spacecraft (TOPS) project was established to provide the advanced systems technology that would allow the realistic estimates of performance, cost, reliability, and scheduling that are required for an actual flight mission. A system design of the complete RTG-powered outer planet spacecraft was made; major technical innovations of certain hardware elements were designed, developed, and tested; and reliability and quality assurance concepts were developed for long-life requirements. At the conclusion of its active phase, the TOPS Project reached its principal objectives: a development and experience base was established for project definition, and for estimating cost, performance, and reliability; an understanding of system and subsystem capabilities for successful outer planets missions was achieved. The system design answered long-life requirements with massive redundancy, controlled by on-board analysis of spacecraft performance data.
Automated Methodologies for the Design of Flow Diagrams for Development and Maintenance Activities
NASA Astrophysics Data System (ADS)
Shivanand M., Handigund; Shweta, Bhat
The Software Requirements Specification (SRS) of the organization is a text document prepared by strategic management incorporating the requirements of the organization. These requirements of ongoing business/ project development process involve the software tools, the hardware devices, the manual procedures, the application programs and the communication commands. These components are appropriately ordered for achieving the mission of the concerned process both in the project development and the ongoing business processes, in different flow diagrams viz. activity chart, workflow diagram, activity diagram, component diagram and deployment diagram. This paper proposes two generic, automatic methodologies for the design of various flow diagrams of (i) project development activities, (ii) ongoing business process. The methodologies also resolve the ensuing deadlocks in the flow diagrams and determine the critical paths for the activity chart. Though both methodologies are independent, each complements other in authenticating its correctness and completeness.
Spacecraft platform cost estimating relationships
NASA Technical Reports Server (NTRS)
Gruhl, W. M.
1972-01-01
The three main cost areas of unmanned satellite development are discussed. The areas are identified as: (1) the spacecraft platform (SCP), (2) the payload or experiments, and (3) the postlaunch ground equipment and operations. The SCP normally accounts for over half of the total project cost and accurate estimates of SCP costs are required early in project planning as a basis for determining total project budget requirements. The development of single formula SCP cost estimating relationships (CER) from readily available data by statistical linear regression analysis is described. The advantages of single formula CER are presented.
The making of the mechanical universe
NASA Technical Reports Server (NTRS)
Blinn, James
1989-01-01
The Mechanical Universe project required the production of over 550 different animated scenes, totaling about 7 and 1/2 hours of screen time. The project required the use of a wide range of techniques and motivated the development of several different software packages. A documentation is presented of many aspects of the project, encompassing artistic design issues, scientific simulations, software engineering, and video engineering.
Automatic control of a robotic vehicle
NASA Technical Reports Server (NTRS)
Mcreynolds, S. R.
1976-01-01
Over the last several years Jet Propulsion Laboratory has been engaged in a project to develop some of the technology required to build a robotic vehicle for exploring planetary surfaces. An overview of hardware and software being developed for this project is given. Particular emphasis is placed on the description of the current design for the Vehicle System required for locomotion and the path planning algorithm.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lehman, A.T.; Khanna, R.
1996-11-01
Diverse environmental reviews and approvals are required by both Government and non-government organizations (NGOs) for licensing or permitting of major thermal power plants in Asia; specifically, India and Philippines. The number and type of approvals required for a specific project vary depending on site characteristics, fuel source, project-specific design and operating parameters as well as type of project financing. A model 400 MW coal-fired project located in Asia is presented to illustrate the various lender and host country environmental guidelines. A case study of the environmental reviews and approvals for Ogden Quezon Power, Inc. Project (Quezon Province, Republic of themore » Philippines) is also included. A list of acronyms is provided at the paper`s end. As independent power project (IPP) developers seek financing for these capital-intensive infrastructure projects, a number of international finance/lending institutions are likely to become involved. Each lender considers different environmental aspects of a project. This paper compares relevant environmental requirements of various lenders which finance IPPs and their interest in a project`s environmental review. Finally, the authors of this paper believe that the environmental review process can bring together many parties involved with IPP development, including local and central governments, non government organizations, various lenders (such as multilateral and export credit agencies) as well as project proponents. Environmental review provides input opportunity for interested and affected parties. Airing environmental issues in open forums such as public hearings or meetings helps ensure projects are not evaluated without public input.« less
Systems engineering real estate development projects
NASA Astrophysics Data System (ADS)
Gusakova, Elena; Titarenko, Boris; Stepanov, Vitaliy
2017-10-01
In recent years, real estate development has accumulated a wealth of experience in implementing major projects, which requires comprehension and systematization. The scientific instrument of system engineering is studied in the article and is substantively interpreted with reference to real estate development projects. The most perspective approaches and models are substantiated, allowing strategically to plan the life cycle of the project as a whole, and also to solve the engineering butt problems of the project. The relevance of further scientific studies of regularities and specifics of the life cycle of real estate development projects conducted at the Moscow State University of Economics and Management at the ISTA department is shown.
The Many Dimensions of Program Management
NASA Technical Reports Server (NTRS)
Dean, Edwin B.
1992-01-01
For the purposes of this paper, program refers to a collection of activities or projects which must be performed according to a plan or schedule. The Space Exploration Initiative within the National Aeronautics and Space Administration (NASA) is an example. Dimensionality refers to both the various perspectives of a program and to the components within that perspective. It is, thus, appropriate to think of dimensions of dimensionality. For example, one dimension or perspective of a program is the projects which perform the program. Within the project dimension, the individual projects are the components of that dimensionality. The number of projects defines the spatial dimensionality of the project dimension. Thus, each perspective or dimension has a dimensionality of its own. The structure and associated values of all the various perspectives of a program define the program. A project refers to the collection of activities required to conceive, sell, design, develop, evaluate, produce, operate, support, evolve, and retire a given system. A project thus effects the life cycle of given system. A project is, thus, the system to conceive, sell, design, develop, evaluate, produce, operate, support, evolve, and retire a system. A program, thus, effects the life cycle of the collection of projects required to effect the collection of systems required to implement the program.
NASA Astrophysics Data System (ADS)
Dingwall, B. J.
2015-12-01
NASA's Science Mission Directorate (SMD) recognizes that suborbital carriers play a vital role in training our country's future science and technology leaders. SMD created the Undergraduate Student Instrument Project (USIP) to offer students the opportunity to design, build, and fly instruments on NASA's unique suborbital research platforms. This paper explores the projects, the impact, and the lessons learned of USIP. USIP required undergraduate teams to design, build, and fly a scientific instrument in 18 months or less. Students were required to form collaborative multidisciplinary teams to design, develop and build their instrument. Teams quickly learned that success required skills often overlooked in an academic environment. Teams quickly learned to share technical information in a clear and concise manner that could be understood by other disciplines. The aggressive schedule required team members to hold each other accountable for progress while maintaining team unity. Unanticipated problems and technical issues led students to a deeper understanding of the need for schedule and cost reserves. Students exited the program with a far deeper understanding of project management and team dynamics. Through the process of designing and building an instrument that will enable new research transforms students from textbook learners to developers of new knowledge. The initial USIP project funded 10 undergraduate teams that flew a broad range of scientific instruments on scientific balloons, sounding rockets, commercial rockets and aircraft. Students were required to prepare for and conduct the major reviews that are an integral part of systems development. Each project conducted a Preliminary Design Review, Critical Design Review and Mission Readiness review for NASA officials and flight platform providers. By preparing and presenting their designs to technical experts, the students developed a deeper understanding of the technical and programmatic project pieces that were necessary for success. A student survey was conducted to assess the impact of USIP. Over 90% of students reported a significant improvement in their technical and project management skills. Perhaps more importantly, 88% of students reported that they have a far better appreciation for the value of multi-disciplinary teams.
Some Findings Concerning Requirements in Agile Methodologies
NASA Astrophysics Data System (ADS)
Rodríguez, Pilar; Yagüe, Agustín; Alarcón, Pedro P.; Garbajosa, Juan
Agile methods have appeared as an attractive alternative to conventional methodologies. These methods try to reduce the time to market and, indirectly, the cost of the product through flexible development and deep customer involvement. The processes related to requirements have been extensively studied in literature, in most cases in the frame of conventional methods. However, conclusions of conventional methodologies could not be necessarily valid for Agile; in some issues, conventional and Agile processes are radically different. As recent surveys report, inadequate project requirements is one of the most conflictive issues in agile approaches and better understanding about this is needed. This paper describes some findings concerning requirements activities in a project developed under an agile methodology. The project intended to evolve an existing product and, therefore, some background information was available. The major difficulties encountered were related to non-functional needs and management of requirements dependencies.
7 CFR 4280.149 - Requirements after project construction.
Code of Federal Regulations, 2012 CFR
2012-01-01
... specified in paragraphs (a) and (b) of this section, as applicable. (a) Renewable energy projects. For renewable energy projects, commencing the first full calendar year following the year in which project...) Recommendations for development of future similar projects. (7) Actual jobs created or saved. (b) Energy...
7 CFR 4280.149 - Requirements after project construction.
Code of Federal Regulations, 2013 CFR
2013-01-01
... specified in paragraphs (a) and (b) of this section, as applicable. (a) Renewable energy projects. For renewable energy projects, commencing the first full calendar year following the year in which project...) Recommendations for development of future similar projects. (7) Actual jobs created or saved. (b) Energy...
7 CFR 4280.149 - Requirements after project construction.
Code of Federal Regulations, 2014 CFR
2014-01-01
... specified in paragraphs (a) and (b) of this section, as applicable. (a) Renewable energy projects. For renewable energy projects, commencing the first full calendar year following the year in which project...) Recommendations for development of future similar projects. (7) Actual jobs created or saved. (b) Energy...
EXOS research on master controllers for robotic devices
NASA Technical Reports Server (NTRS)
Marcus, Beth A.; An, Ben; Eberman, Brian
1992-01-01
Two projects are currently being conducted by EXOS under the Small Business Innovation Research (SBIR) program with NASA. One project will develop a force feedback device for controlling robot hands, the other will develop an elbow and shoulder exoskeleton which can be integrated with other EXOS devices to provide whole robot arm and hand control. Aspects covered are the project objectives, important research issues which have arisen during the developments, and interim results of the projects. The Phase 1 projects currently underway will result in hardware prototypes and identification of research issues required for complete system development and/or integration.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hiroyoshi Ueda; Katsuhiko Ishiguro; Kazumi Kitayama
2007-07-01
NUMO (Nuclear Waste Management Organization of Japan) has a responsibility for implementing geological disposal of vitrified HLW (High-Level radioactive Waste) in the Japanese nuclear waste management programme. Its staged siting procedure was initiated in 2002 by an open call for volunteer sites. Careful management strategy and methodology for the technical decision-making at every milestone are required to prepare for the volunteer site application and the site investigation stages after that. The formal Requirement Management System (RMS) is planned to support the computerized implementation of the specific management methodology, termed the NUMO Structured Approach (NSA). This planned RMS will help formore » comprehensive management of the decision-making processes in the geological disposal project, change management towards the anticipated project deviations, efficient project driving such as well programmed R and D etc. and structured record-keeping regarding the past decisions, which leads to soundness of the project in terms of the long-term continuity. The system should have handling/management functions for the database including the decisions/requirements in the project in consideration, their associated information and the structures composed of them in every decision-making process. The information relating to the premises, boundary conditions and time plan of the project should also be prepared in the system. Effective user interface and efficient operation on the in-house network are necessary. As a living system for the long-term formal use, flexibility to updating is indispensable. In advance of the formal system development, two-year activity to develop the preliminary RMS was already started. The purpose of this preliminary system is to template the decision/requirement structure, prototype the decision making management and thus show the feasibility of the innovative RMS. The paper describes the current status of the development, focusing on the initial stage including work analysis/modeling and the system conceptualization. (authors)« less
The Oregon Applied Academics Project: Final Report
ERIC Educational Resources Information Center
Pearson, Donna; Richardson, George B.; Sawyer, Jennifer M.
2013-01-01
This report contains the findings of the Oregon Applied Academics research and development project which spanned three academic years from 2010 through 2013. The overall purpose of the project was to develop and implement a technical math course that would meet graduation requirements and improve student performance. The State of Oregon has been…
Guidance for Quality Assurance Project Plans, EPA QA/G-5
provides guidance to EPA employees and other organizations involved in developing Quality Assurance (QA) Project Plans that address the specifications listed in EPA Requirements for QA Project Plans (QA/R-5)
Daniel, Christel; Ouagne, David; Sadou, Eric; Forsberg, Kerstin; Gilchrist, Mark Mc; Zapletal, Eric; Paris, Nicolas; Hussain, Sajjad; Jaulent, Marie-Christine; MD, Dipka Kalra
2016-01-01
With the development of platforms enabling the use of routinely collected clinical data in the context of international clinical research, scalable solutions for cross border semantic interoperability need to be developed. Within the context of the IMI EHR4CR project, we first defined the requirements and evaluation criteria of the EHR4CR semantic interoperability platform and then developed the semantic resources and supportive services and tooling to assist hospital sites in standardizing their data for allowing the execution of the project use cases. The experience gained from the evaluation of the EHR4CR platform accessing to semantically equivalent data elements across 11 European participating EHR systems from 5 countries demonstrated how far the mediation model and mapping efforts met the expected requirements of the project. Developers of semantic interoperability platforms are beginning to address a core set of requirements in order to reach the goal of developing cross border semantic integration of data. PMID:27570649
Software Program: Software Management Guidebook
NASA Technical Reports Server (NTRS)
1996-01-01
The purpose of this NASA Software Management Guidebook is twofold. First, this document defines the core products and activities required of NASA software projects. It defines life-cycle models and activity-related methods but acknowledges that no single life-cycle model is appropriate for all NASA software projects. It also acknowledges that the appropriate method for accomplishing a required activity depends on characteristics of the software project. Second, this guidebook provides specific guidance to software project managers and team leaders in selecting appropriate life cycles and methods to develop a tailored plan for a software engineering project.
Yield model development project implementation plan
NASA Technical Reports Server (NTRS)
Ambroziak, R. A.
1982-01-01
Tasks remaining to be completed are summarized for the following major project elements: (1) evaluation of crop yield models; (2) crop yield model research and development; (3) data acquisition processing, and storage; (4) related yield research: defining spectral and/or remote sensing data requirements; developing input for driving and testing crop growth/yield models; real time testing of wheat plant process models) and (5) project management and support.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 13 Business Credit and Assistance 1 2013-01-01 2013-01-01 false Project sign. 305.12 Section 305... WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects § 305.12 Project sign. The... the construction period of a sign or signs at a conspicuous place at the Project site indicating that...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false Project sign. 305.12 Section 305... WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects § 305.12 Project sign. The... the construction period of a sign or signs at a conspicuous place at the Project site indicating that...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Project sign. 305.12 Section 305... WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects § 305.12 Project sign. The... the construction period of a sign or signs at a conspicuous place at the Project site indicating that...
Adoption of Requirements Engineering Practices in Malaysian Software Development Companies
NASA Astrophysics Data System (ADS)
Solemon, Badariah; Sahibuddin, Shamsul; Ghani, Abdul Azim Abd
This paper presents exploratory survey results on Requirements Engineering (RE) practices of some software development companies in Malaysia. The survey attempted to identify patterns of RE practices the companies are implementing. Information required for the survey was obtained through a survey, mailed self-administered questionnaires distributed to project managers and software developers who are working at software development companies operated across the country. The results showed that the overall adoption of the RE practices in these companies is strong. However, the results also indicated that fewer companies in the survey have use appropriate CASE tools or software to support their RE process and practices, define traceability policies and maintain traceability manual in their projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gilliam, T.M.
1991-05-01
This Project Quality Assurance Plan (PQAP) sets forth the quality assurance (QA) requirements that are applied to those elements of the Westinghouse Materials Company of Ohio (WMCO) Operable Unit 1 support at Oak Ridge National Laboratory (ORNL) project that involve research and development (R D) performed at ORNL. This is in compliance with the applicable criteria of 10 CFR Part 50, Appendix B, ANSI/ASME NQA-1, as specified by Department of Energy (DOE) Oak Ridge Operations (ORO) Order 5700.6B. For this application, NQA-1 is the core QA Program requirements document. QA policy, normally found in the requirements document, is contained herein.more » The requirements of this PQAP apply to project activities that affect the quality and reliability/credibility of research, development, and investigative data and documentation. These activities include the functions of attaining quality objectives and assuring that an appropriate QA program scope is established. The scope of activities affecting quality includes organization; personnel training and qualifications; design control; procurement; material handling and storage; operating procedures; testing, surveillance, and auditing; R D investigative activities and documentation; deficiencies; corrective actions; and QA record keeping. 12 figs.« less
Requirement Metrics for Risk Identification
NASA Technical Reports Server (NTRS)
Hammer, Theodore; Huffman, Lenore; Wilson, William; Rosenberg, Linda; Hyatt, Lawrence
1996-01-01
The Software Assurance Technology Center (SATC) is part of the Office of Mission Assurance of the Goddard Space Flight Center (GSFC). The SATC's mission is to assist National Aeronautics and Space Administration (NASA) projects to improve the quality of software which they acquire or develop. The SATC's efforts are currently focused on the development and use of metric methodologies and tools that identify and assess risks associated with software performance and scheduled delivery. This starts at the requirements phase, where the SATC, in conjunction with software projects at GSFC and other NASA centers is working to identify tools and metric methodologies to assist project managers in identifying and mitigating risks. This paper discusses requirement metrics currently being used at NASA in a collaborative effort between the SATC and the Quality Assurance Office at GSFC to utilize the information available through the application of requirements management tools.
Cultural differences in Research project management
NASA Astrophysics Data System (ADS)
Barbier, Michele
2016-04-01
Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.
FOD Prevention at NASA-Marshall Space Flight Center
NASA Technical Reports Server (NTRS)
Lowrey, Nikki M.
2011-01-01
NASA now requires all flight hardware projects to develop and implement a Foreign Object Damage (FOD) Prevention Program. With the increasing use of composite and bonded structures, NASA now also requires an Impact Damage Protection Plan for these items. In 2009, Marshall Space Flight Center released an interim directive that required all Center organizations to comply with FOD protocols established by on-site Projects, to include prevention of impact damage. The MSFC Technical Standards Control Board authorized the development of a new MSFC technical standard for FOD Prevention.
Advances in EPA’s Rapid Exposure and Dosimetry Project (Interagency Alternatives Assessment Webinar)
Estimates of human and ecological exposures are required as critical input to risk-based prioritization and screening of chemicals. The CSS Rapid Exposure and Dosimetry project seeks to develop the data, tools, and evaluation approaches required to generate rapid and scientifical...
14 CFR 1216.305 - Criteria for actions requiring environmental assessments.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Criteria for actions requiring environmental... spacecraft development and flight projects in space and terrestrial applications. (3) Specific experimental... experimental projects. (4) R&D (or SFCDC) activities in space transportation systems engineering and scientific...
Genetic Programming as Alternative for Predicting Development Effort of Individual Software Projects
Chavoya, Arturo; Lopez-Martin, Cuauhtemoc; Andalon-Garcia, Irma R.; Meda-Campaña, M. E.
2012-01-01
Statistical and genetic programming techniques have been used to predict the software development effort of large software projects. In this paper, a genetic programming model was used for predicting the effort required in individually developed projects. Accuracy obtained from a genetic programming model was compared against one generated from the application of a statistical regression model. A sample of 219 projects developed by 71 practitioners was used for generating the two models, whereas another sample of 130 projects developed by 38 practitioners was used for validating them. The models used two kinds of lines of code as well as programming language experience as independent variables. Accuracy results from the model obtained with genetic programming suggest that it could be used to predict the software development effort of individual projects when these projects have been developed in a disciplined manner within a development-controlled environment. PMID:23226305
Using a formal requirements management tool for system engineering: first results at ESO
NASA Astrophysics Data System (ADS)
Zamparelli, Michele
2006-06-01
The attention to proper requirement analysis and maintenance is growing in modern astronomical undertakings. The increasing degree of complexity that current and future generations of projects have reached requires substantial system engineering efforts and the usage of all available technology to keep project development under control. One such technology is a tool which helps managing relationships between deliverables at various development stages, and across functional subsystems and disciplines as different as software, mechanics, optics and electronics. The immediate benefits are traceability and the possibility to do impact analysis. An industrially proven tool for requirements management is presented together with the first results across some projects at ESO and a cost/benefit analysis of its usage. Experience gathered so far shows that the extensibility and configurability of the tool from one hand, and integration with common documentation formats and standards on the other, make it appear as a promising solution for even small scale system development.
24 CFR 92.206 - Eligible project costs.
Code of Federal Regulations, 2013 CFR
2013-04-01
... lead-based paint activities, as required by part 35 of this title. (3) For both new construction and... on-site roads and sewer and water lines necessary to the development of the project. The project site...
24 CFR 92.206 - Eligible project costs.
Code of Federal Regulations, 2011 CFR
2011-04-01
... lead-based paint activities, as required by part 35 of this title. (3) For both new construction and... on-site roads and sewer and water lines necessary to the development of the project. The project site...
24 CFR 92.206 - Eligible project costs.
Code of Federal Regulations, 2012 CFR
2012-04-01
... lead-based paint activities, as required by part 35 of this title. (3) For both new construction and... on-site roads and sewer and water lines necessary to the development of the project. The project site...
Teachers as Researchers: Supporting Professional Development.
ERIC Educational Resources Information Center
Gennaoui, Michele; Kretschmer, Robert E.
1996-01-01
Contrasts traditional professional development and a teacher-as-researcher project implemented at the Saint Francis de Sales School for the Deaf. Discusses ways the project influenced the professional development of teachers, the effects on the school community of group collaboration among diverse professional staff, support mechanisms required,…
NASA Technical Reports Server (NTRS)
Kirkpatrick, Paul D.; Williams, Jeffrey G.; Condzella, Bill R.
2008-01-01
A rigorous set of detailed ground safety requirements is required to make sure that ground support equipment (GSE) and associated planned ground operations are conducted safely. Detailed ground safety requirements supplement the GSE requirements already called out in NASA-STD-5005. This paper will describe the initial genesis of these ground safety requirements, the establishment and approval process and finally the implementation process for Project Orion. The future of the requirements will also be described. Problems and issues encountered and overcame will be discussed.
Managing environmental issues during international electric power project development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cooper, H.W.
1998-07-01
Responsible international project developers most often view environmental matters with quite mixed emotions. Those with whom Dynalytics has worked would certainly never contemplate jeopardizing the health of anyone in the world. But while they want their projects realized, and are willing to implement reasonable requirements, they are often asked to do more than is appropriate, more than is technologically possible, and more than is financially possible. The paper discusses the following: who is in charge of environmental matters; whose environmental standards apply; the role of technology; accelerating timetables and reducing costs; documentation and applications; and post-construction requirements.
Testing Omega P’s 650 KW, 1.3 GHZ Low-Voltage Multi-Beam Klystron for the Project X Pulsed LINAC
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fermi Research Alliance; Omega-P Inc.
Omega-P Inc. had developed a multi beam 1.3 GHz klystron (MBK) for the Project X pulsed linac application. Testing of the klystron require a special hardware such as a modulator, RF components, control system, power supplies, etc, as well as associated infrastructure( electricity, water, safety). This is an expensive part of klystron development for which Omega-P does not have the required equipment. Fermilab will test the MBK at Fermilab site providing contribution to the project all the necessary facilities, infrastructure and manpower for MBK test performance and analysis.
Real-time operating system for selected Intel processors
NASA Technical Reports Server (NTRS)
Pool, W. R.
1980-01-01
The rationale for system development is given along with reasons for not using vendor supplied operating systems. Although many system design and performance goals were dictated by problems with vendor supplied systems, other goals surfaced as a result of a design for a custom system able to span multiple projects. System development and management problems and areas that required redesign or major code changes for system implementation are examined as well as the relative successes of the initial projects. A generic description of the actual project is provided and the ongoing support requirements and future plans are discussed.
1998-08-04
manufacturing Military and commercial applications Large market developing for multiple- satellite constellations Will have a high demand if...identified, and market assessments for five different possible projects are discussed. Lessons learned during the first semester of project work are...24 1.2.6 Market Assessments of Five Concepts 26 1.2.7 Project Selection 28 Chapter 2 Requirements Analysis and Top-Level System Architecture 30
ERIC Educational Resources Information Center
Ekstrom, Ruth B.; And Others
Competency scales were developed for 10 direct-entry occupations and 10 vocational education programs as part of Project ACCESS, a project to assess women's life experience learning for entrance into employment and for advanced placement in vocational education programs. Development of the occupational scales involved employer interviews, followed…
Tailoring a software production environment for a large project
NASA Technical Reports Server (NTRS)
Levine, D. R.
1984-01-01
A software production environment was constructed to meet the specific goals of a particular large programming project. These goals, the specific solutions as implemented, and the experiences on a project of over 100,000 lines of source code are discussed. The base development environment for this project was an ordinary PWB Unix (tm) system. Several important aspects of the development process required support not available in the existing tool set.
Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective
NASA Astrophysics Data System (ADS)
Subramanyam, K.; Haridharan, M. K.
2017-07-01
Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.
ERIC Educational Resources Information Center
Bentley, Danielle C.
2014-01-01
This paper describes the inaugural success of implementing Inquiry Guided Learning Projects within a college-level human anatomy and physiology course. In this context, scientific inquiry was used as a means of developing skills required for critical thinking among students. The projects were loosely designed using the Information Search Process…
Jennifer L. Long; Melanie Miller; James P. Menakis; Robert E. Keane
2006-01-01
The Landscape Fire and Resource Management Planning Tools Prototype Project, or LANDFIRE Prototype Project, required a system for classifying vegetation composition, biophysical settings, and vegetation structure to facilitate the mapping of vegetation and wildland fuel characteristics and the simulation of vegetation dynamics using landscape modeling. We developed...
ERIC Educational Resources Information Center
Kocherla, Showry
2012-01-01
Information technology (IT) projects are considered successful if they are completed on time, within budget, and within scope. Even though, the required tools and methodologies are in place, IT projects continue to fail at a higher rate. Current literature lacks explanation for success within the stages of system development life-cycle (SDLC) such…
Systems Engineering in NASA's R&TD Programs
NASA Technical Reports Server (NTRS)
Jones, Harry
2005-01-01
Systems engineering is largely the analysis and planning that support the design, development, and operation of systems. The most common application of systems engineering is in guiding systems development projects that use a phased process of requirements, specifications, design, and development. This paper investigates how systems engineering techniques should be applied in research and technology development programs for advanced space systems. These programs should include anticipatory engineering of future space flight systems and a project portfolio selection process, as well as systems engineering for multiple development projects.
USDA-ARS?s Scientific Manuscript database
An increase in abnormal climate change patterns and unsustainable irrigation in uplands cause drought and affect agricultural water security, crop productivity, and price fluctuations. In this study, we developed a soil moisture model to project irrigation requirements (IR) for upland crops under cl...
7 CFR 4280.29 - Supplemental financing required for the Ultimate Recipient Project.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 15 2010-01-01 2010-01-01 false Supplemental financing required for the Ultimate Recipient Project. 4280.29 Section 4280.29 Agriculture Regulations of the Department of Agriculture... AND GRANTS Rural Economic Development Loan and Grant Programs § 4280.29 Supplemental financing...
Photometric requirements for portable changeable message signs.
DOT National Transportation Integrated Search
2001-09-01
This project reviewed the performance of pchangeable message signs (PCMSs) and developed photometric standards to establish performance requirements. In addition, researchers developed photometric test methods and recommended them for use in evaluati...
75 FR 81637 - Commercial Lease for the Cape Wind Energy Project
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-28
... Commercial Lease for the Cape Wind Energy Project AGENCY: Bureau of Ocean Energy Management, Regulation and... Renewable Energy Development on the Outer Continental Shelf (``OCS'') for the Cape Wind Energy Project... requirements of 30 CFR 285.231. The Lease is for the Cape Wind Energy Project (``Project'') which grants Cape...
The science of laboratory and project management in regulated bioanalysis.
Unger, Steve; Lloyd, Thomas; Tan, Melvin; Hou, Jingguo; Wells, Edward
2014-05-01
Pharmaceutical drug development is a complex and lengthy process, requiring excellent project and laboratory management skills. Bioanalysis anchors drug safety and efficacy with systemic and site of action exposures. Development of scientific talent and a willingness to innovate or adopt new technology is essential. Taking unnecessary risks, however, should be avoided. Scientists must strategically assess all risks and find means to minimize or negate them. Laboratory Managers must keep abreast of ever-changing technology. Investments in instrumentation and laboratory design are critical catalysts to efficiency and safety. Matrix management requires regular communication between Project Managers and Laboratory Managers. When properly executed, it aligns the best resources at the right times for a successful outcome. Attention to detail is a critical aspect that separates excellent laboratories. Each assay is unique and requires attention in its development, validation and execution. Methods, training and facilities are the foundation of a bioanalytical laboratory.
Interface Management for a NASA Flight Project Using Model-Based Systems Engineering (MBSE)
NASA Technical Reports Server (NTRS)
Vipavetz, Kevin; Shull, Thomas A.; Infeld, Samatha; Price, Jim
2016-01-01
The goal of interface management is to identify, define, control, and verify interfaces; ensure compatibility; provide an efficient system development; be on time and within budget; while meeting stakeholder requirements. This paper will present a successful seven-step approach to interface management used in several NASA flight projects. The seven-step approach using Model Based Systems Engineering will be illustrated by interface examples from the Materials International Space Station Experiment-X (MISSE-X) project. The MISSE-X was being developed as an International Space Station (ISS) external platform for space environmental studies, designed to advance the technology readiness of materials and devices critical for future space exploration. Emphasis will be given to best practices covering key areas such as interface definition, writing good interface requirements, utilizing interface working groups, developing and controlling interface documents, handling interface agreements, the use of shadow documents, the importance of interface requirement ownership, interface verification, and product transition.
COSTMODL - AN AUTOMATED SOFTWARE DEVELOPMENT COST ESTIMATION TOOL
NASA Technical Reports Server (NTRS)
Roush, G. B.
1994-01-01
The cost of developing computer software consumes an increasing portion of many organizations' budgets. As this trend continues, the capability to estimate the effort and schedule required to develop a candidate software product becomes increasingly important. COSTMODL is an automated software development estimation tool which fulfills this need. Assimilating COSTMODL to any organization's particular environment can yield significant reduction in the risk of cost overruns and failed projects. This user-customization capability is unmatched by any other available estimation tool. COSTMODL accepts a description of a software product to be developed and computes estimates of the effort required to produce it, the calendar schedule required, and the distribution of effort and staffing as a function of the defined set of development life-cycle phases. This is accomplished by the five cost estimation algorithms incorporated into COSTMODL: the NASA-developed KISS model; the Basic, Intermediate, and Ada COCOMO models; and the Incremental Development model. This choice affords the user the ability to handle project complexities ranging from small, relatively simple projects to very large projects. Unique to COSTMODL is the ability to redefine the life-cycle phases of development and the capability to display a graphic representation of the optimum organizational structure required to develop the subject project, along with required staffing levels and skills. The program is menu-driven and mouse sensitive with an extensive context-sensitive help system that makes it possible for a new user to easily install and operate the program and to learn the fundamentals of cost estimation without having prior training or separate documentation. The implementation of these functions, along with the customization feature, into one program makes COSTMODL unique within the industry. COSTMODL was written for IBM PC compatibles, and it requires Turbo Pascal 5.0 or later and Turbo Professional 5.0 for recompilation. An executable is provided on the distribution diskettes. COSTMODL requires 512K RAM. The standard distribution medium for COSTMODL is three 5.25 inch 360K MS-DOS format diskettes. The contents of the diskettes are compressed using the PKWARE archiving tools. The utility to unarchive the files, PKUNZIP.EXE, is included. COSTMODL was developed in 1991. IBM PC is a registered trademark of International Business Machines. Borland and Turbo Pascal are registered trademarks of Borland International, Inc. Turbo Professional is a trademark of TurboPower Software. MS-DOS is a registered trademark of Microsoft Corporation. Turbo Professional is a trademark of TurboPower Software.
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
Resolving the problem of compliance with the ever increasing and changing regulations
NASA Astrophysics Data System (ADS)
Leigh, Harley
1992-01-01
The most common problem identified at several U.S. Department of Energy (DOE) sites is regulatory compliance. Simply, the project viability depends on identifying regulatory requirements at the beginning of a specific project to avoid possible delays and cost overruns. The Radioisotope Power Systems Facility (RPSF) is using the Regulatory Compliance System (RCS) to deal with the problem that well over 1000 regulatory documents had to be reviewed for possible compliance requirements applicable to the facility. This overwhelming number of possible documents is not atypical of all DOE facilities thus far reviewed using the RCS system. The RCS was developed to provide control and tracking of all the regulatory and institutional requirements on a given project. WASTREN, Inc., developed the RCS through various DOE contracts and continues to enhance and update the system for existing and new contracts. The RCS provides the information to allow the technical expert to assimilate and manage accurate resource information, compile the necessary checklists, and document that the project or facility fulfills all of the appropriate regulatory requirements. The RCS provides on-line information, including status throughout the project life, thereby allowing more intelligent and proactive decision making. Also, consistency and traceability are provided for regulatory compliance documentation.
14 CFR 1216.305 - Criteria for actions requiring environmental assessments.
Code of Federal Regulations, 2010 CFR
2010-01-01
... spacecraft development and flight projects in space and terrestrial applications. (3) Specific experimental projects in aeronautics and space technology and energy technology applications. (4) Development and... technology applications (e.g., Research and Technology Base, Systems Technology Programs) other than...
NASA Technical Reports Server (NTRS)
Moynihan, Gary P.
1992-01-01
In June 1991, the MITRE Corporation submitted a series of recommendations as part of a Marshall Space Flight Center (MSFC) Management Information System Requirements Study, initiated by the Information Systems Office (ISO). A major recommendation of the study was to develop an Executive Information System (EIS) for MSFC executives. ISO was directed, by center management, to proceed with the development of a Center-Wide Executive Information System. Existing EIS prototypes, developed by the Space Shuttle Projects Office and the Payload Projects Office, were reviewed. These existing MSFC prototypes were considered not to encompass the required functionality needed on a center-wide basis. A follow-up study by MITRE provided top-level system requirements. These were later incorporated into a final requirements specification document by Boeing Computer Support Services.
Guidance and Control Software Project Data - Volume 2: Development Documents
NASA Technical Reports Server (NTRS)
Hayhurst, Kelly J. (Editor)
2008-01-01
The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the development documents from the GCS project. Volume 2 contains three appendices: A. Guidance and Control Software Development Specification; B. Design Description for the Pluto Implementation of the Guidance and Control Software; and C. Source Code for the Pluto Implementation of the Guidance and Control Software
Collaborative decision-making on wind power projects based on AHP method
NASA Astrophysics Data System (ADS)
Badea, A.; Proştean, G.; Tămăşilă, M.; Vârtosu, A.
2017-01-01
The complexity of projects implementation in Renewable Energy Sources (RES) requires finding collaborative alliances between suppliers and project developers in RES. Links activities in supply chain in RES, respectively, transportation of heavy components, processing orders to purchase quality raw materials, storage and materials handling, packaging, and other complex activities requiring a logistics system collaboratively to be permanently dimensioned properly selected and monitored. Requirements imposed by stringency of wind power energy projects implementation inevitably involves constraints in infrastructure, implementation and logistics. Thus, following an extensive research in RES project, to eliminate these constraints were identified alternative collaboration to provide feasible solutions on different levels of performance. The paper presents a critical analysis of different collaboration alternatives in supply chain for RES projects, selecting the ones most suitable for particular situations by using decision-making method Analytic Hierarchy Process (AHP). The role of AHP method was to formulate a decision model by which can be establish the collaboration alternative choice through mathematical calculation to reduce the impact created by constraints encountered. The solution provided through AHP provides a framework for detecting optimal alternative collaboration between suppliers and project developers in RES and avoids some breaks in the chain by resizing safety buffers for leveling orders in RES projects.
Guidelines for developing distributed virtual environment applications
NASA Astrophysics Data System (ADS)
Stytz, Martin R.; Banks, Sheila B.
1998-08-01
We have conducted a variety of projects that served to investigate the limits of virtual environments and distributed virtual environment (DVE) technology for the military and medical professions. The projects include an application that allows the user to interactively explore a high-fidelity, dynamic scale model of the Solar System and a high-fidelity, photorealistic, rapidly reconfigurable aircraft simulator. Additional projects are a project for observing, analyzing, and understanding the activity in a military distributed virtual environment, a project to develop a distributed threat simulator for training Air Force pilots, a virtual spaceplane to determine user interface requirements for a planned military spaceplane system, and an automated wingman for use in supplementing or replacing human-controlled systems in a DVE. The last two projects are a virtual environment user interface framework; and a project for training hospital emergency department personnel. In the process of designing and assembling the DVE applications in support of these projects, we have developed rules of thumb and insights into assembling DVE applications and the environment itself. In this paper, we open with a brief review of the applications that were the source for our insights and then present the lessons learned as a result of these projects. The lessons we have learned fall primarily into five areas. These areas are requirements development, software architecture, human-computer interaction, graphical database modeling, and construction of computer-generated forces.
Design Tools for Cost-Effective Implementation of Planetary Protection Requirements
NASA Technical Reports Server (NTRS)
Hamlin, Louise; Belz, Andrea; Evans, Michael; Kastner, Jason; Satter, Celeste; Spry, Andy
2006-01-01
Since the Viking missions to Mars in the 1970s, accounting for the costs associated with planetary protection implementation has not been done systematically during early project formulation phases, leading to unanticipated costs during subsequent implementation phases of flight projects. The simultaneous development of more stringent planetary protection requirements, resulting from new knowledge about the limits of life on Earth, together with current plans to conduct life-detection experiments on a number of different solar system target bodies motivates a systematic approach to integrating planetary protection requirements and mission design. A current development effort at NASA's Jet Propulsion Laboratory is aimed at integrating planetary protection requirements more fully into the early phases of mission architecture formulation and at developing tools to more rigorously predict associated cost and schedule impacts of architecture options chosen to meet planetary protection requirements.
NICA project management information system
NASA Astrophysics Data System (ADS)
Bashashin, M. V.; Kekelidze, D. V.; Kostromin, S. A.; Korenkov, V. V.; Kuniaev, S. V.; Morozov, V. V.; Potrebenikov, Yu. K.; Trubnikov, G. V.; Philippov, A. V.
2016-09-01
The science projects growth, changing of the efficiency criteria during the project implementation require not only increasing of the management specialization level but also pose the problem of selecting the effective planning methods, monitoring of deadlines and interaction of participants involved in research projects. This paper is devoted to choosing the project management information system for the new heavy-ion collider NICA (Nuclotron based Ion Collider fAcility). We formulate the requirements for the project management information system with taking into account the specifics of the Joint Institute for Nuclear Research (JINR, Dubna, Russia) as an international intergovernmental research organization, which is developed on the basis of a flexible and effective information system for the NICA project management.
Development of the Cassini Ground Data System in a multimission environment
NASA Technical Reports Server (NTRS)
Madrid, G.; Wanczuk, G.
1993-01-01
As baselined, the Cassini Ground Data System (GDS) will be composed of Project specific and multimission elements. The former will be developed by the Cassini Project and the latter by two JPL institutional organizations, the Telecommunications and Data Acquisition Office (TDA) and the Multimission Operations Systems Office (MOSO). The GDS will be developed in three principal phases: Spacecraft Test, Launch-cruise, and Science Tour, with a significant part of the development deferred until the post-launch period. New capabilities are being introduced that are key to the achievement of more cost effective operations. Successful development of the system will require careful planning and will involve participation of diverse disciplines. This paper introduces the Cassini Project from the Ground Data System perspective and discusses development approaches expected to produce systems which meet functional and performance requirements and which will be delivered on schedule and within budget.
Fission Power System Technology for NASA Exploration Missions
NASA Technical Reports Server (NTRS)
Mason, Lee; Houts, Michael
2011-01-01
Under the NASA Exploration Technology Development Program, and in partnership with the Department of Energy (DOE), NASA is conducting a project to mature Fission Power System (FPS) technology. A primary project goal is to develop viable system options to support future NASA mission needs for nuclear power. The main FPS project objectives are as follows: 1) Develop FPS concepts that meet expected NASA mission power requirements at reasonable cost with added benefits over other options. 2) Establish a hardware-based technical foundation for FPS design concepts and reduce overall development risk. 3) Reduce the cost uncertainties for FPS and establish greater credibility for flight system cost estimates. 4) Generate the key products to allow NASA decisionmakers to consider FPS as a preferred option for flight development. In order to achieve these goals, the FPS project has two main thrusts: concept definition and risk reduction. Under concept definition, NASA and DOE are performing trade studies, defining requirements, developing analytical tools, and formulating system concepts. A typical FPS consists of the reactor, shield, power conversion, heat rejection, and power management and distribution (PMAD). Studies are performed to identify the desired design parameters for each subsystem that allow the system to meet the requirements with reasonable cost and development risk. Risk reduction provides the means to evaluate technologies in a laboratory test environment. Non-nuclear hardware prototypes are built and tested to verify performance expectations, gain operating experience, and resolve design uncertainties.
33 CFR 385.21 - Quality control.
Code of Federal Regulations, 2014 CFR
2014-07-01
... will be produced by a Project Delivery Team. The quality control plan shall be included in the Project Management Plan and shall describe the procedures to be used to ensure compliance with technical and policy requirements during implementation. (b) During development of the Project Management Plan for each project, the...
NASA Technical Reports Server (NTRS)
Bhat, Biliyar N.
2008-01-01
Ares I Crew Launch Vehicle Upper Stage is designed and developed based on sound systems engineering principles. Systems Engineering starts with Concept of Operations and Mission requirements, which in turn determine the launch system architecture and its performance requirements. The Ares I-Upper Stage is designed and developed to meet these requirements. Designers depend on the support from materials, processes and manufacturing during the design, development and verification of subsystems and components. The requirements relative to reliability, safety, operability and availability are also dependent on materials availability, characterization, process maturation and vendor support. This paper discusses the roles and responsibilities of materials and manufacturing engineering during the various phases of Ares IUS development, including design and analysis, hardware development, test and verification. Emphasis is placed how materials, processes and manufacturing support is integrated over the Upper Stage Project, both horizontally and vertically. In addition, the paper describes the approach used to ensure compliance with materials, processes, and manufacturing requirements during the project cycle, with focus on hardware systems design and development.
76 FR 24081 - Notice of Commission Determination
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-29
... affect any other gas well development projects targeting the Marcellus or Utica shale formations that the... regarding the requirement for review and approval of natural gas well development projects targeting the Antes, Burket, Geneseo, Mandata, Middlesex, Needmore, or Rhinestreet shale formations. DATES: April 21...
Developing long range traffic projection models for Illinois : final report.
DOT National Transportation Integrated Search
2004-06-01
The project objective was to develop a PC-based tool to assist Illinois Department of Transportation (IDOT) traffic forecasters : to meet FHWA reporting requirements for 2,400 HPMS sections and 27,000 structures in the State of Illinois, and to produ...
Experience report: Using formal methods for requirements analysis of critical spacecraft software
NASA Technical Reports Server (NTRS)
Lutz, Robyn R.; Ampo, Yoko
1994-01-01
Formal specification and analysis of requirements continues to gain support as a method for producing more reliable software. However, the introduction of formal methods to a large software project is difficult, due in part to the unfamiliarity of the specification languages and the lack of graphics. This paper reports results of an investigation into the effectiveness of formal methods as an aid to the requirements analysis of critical, system-level fault-protection software on a spacecraft currently under development. Our experience indicates that formal specification and analysis can enhance the accuracy of the requirements and add assurance prior to design development in this domain. The work described here is part of a larger, NASA-funded research project whose purpose is to use formal-methods techniques to improve the quality of software in space applications. The demonstration project described here is part of the effort to evaluate experimentally the effectiveness of supplementing traditional engineering approaches to requirements specification with the more rigorous specification and analysis available with formal methods.
The path to an experiment in space (from concept to flight)
NASA Technical Reports Server (NTRS)
Salzman, Jack A.
1994-01-01
The following are discussed in this viewgraph presentation on developing flight experiments for NASA's Microgravity Science and Applications Program: time from flight PI selection to launch; key flight experiment phases and schedule drivers; microgravity experiment definition/development process; definition and engineering development phase; ground-based reduced gravity research facilities; project organization; responsibilities and duties of principle investigator/co-investigators, project scientist, and project manager; the science requirements document; flight development phase; experiment cost and schedule; and keys to experiment success.
Financing Renewable Energy Projects in Developing Countries: A Critical Review
NASA Astrophysics Data System (ADS)
Donastorg, A.; Renukappa, S.; Suresh, S.
2017-08-01
Access to clean and stable energy, meeting sustainable development goals, the fossil fuel dependency and depletion are some of the reasons that have impacted developing countries to transform the business as usual economy to a more sustainable economy. However, access and availability of finance is a major challenge for many developing countries. Financing renewable energy projects require access to significant resources, by multiple parties, at varying points in the project life cycles. This research aims to investigate sources and new trends in financing RE projects in developing countries. For this purpose, a detail and in-depth literature review have been conducted to explore the sources and trends of current RE financial investment and projects, to understand the gaps and limitations. This paper concludes that there are various internal and external sources of finance available for RE projects in developing countries.
NASA's TReK Project: A Case Study in Using the Spiral Model of Software Development
NASA Technical Reports Server (NTRS)
Hendrix, T. Dean; Schneider, Michelle P.
1998-01-01
Software development projects face numerous challenges that threaten their successful completion. Whether it is not enough money, too little time, or a case of "requirements creep" that has turned into a full sprint, projects must meet these challenges or face possible disastrous consequences. A robust, yet flexible process model can provide a mechanism through which software development teams can meet these challenges head on and win. This article describes how the spiral model has been successfully tailored to a specific project and relates some notable results to date.
Space Station Furnace Facility Preliminary Project Implementation Plan (PIP). Volume 2, Appendix 2
NASA Technical Reports Server (NTRS)
Perkey, John K.
1992-01-01
The Space Station Furnace Facility (SSFF) is an advanced facility for materials research in the microgravity environment of the Space Station Freedom and will consist of Core equipment and various sets of Furnace Module (FM) equipment in a three-rack configuration. This Project Implementation Plan (PIP) document was developed to satisfy the requirements of Data Requirement Number 4 for the SSFF study (Phase B). This PIP shall address the planning of the activities required to perform the detailed design and development of the SSFF for the Phase C/D portion of this contract.
Guide to Permitting Hydrogen Motor Fuel Dispensing Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rivkin, Carl; Buttner, William; Burgess, Robert
2016-03-28
The purpose of this guide is to assist project developers, permitting officials, code enforcement officials, and other parties involved in developing permit applications and approving the implementation of hydrogen motor fuel dispensing facilities. The guide facilitates the identification of the elements to be addressed in the permitting of a project as it progresses through the approval process; the specific requirements associated with those elements; and the applicable (or potentially applicable) codes and standards by which to determine whether the specific requirements have been met. The guide attempts to identify all applicable codes and standards relevant to the permitting requirements.
Code of Federal Regulations, 2010 CFR
2004-04-01
... 24 Housing and Urban Development 2 2004-04-01 2004-04-01 false Title. 200.61 Section 200.61... Requirements for Existing Projects General Requirements § 200.61 Title. (a) Marketable title to the project must be vested in the mortgagor as of the date the mortgage is filed for record. (b) Title evidence for...
Code of Federal Regulations, 2010 CFR
2005-04-01
... 24 Housing and Urban Development 2 2005-04-01 2005-04-01 false Title. 200.61 Section 200.61... Requirements for Existing Projects General Requirements § 200.61 Title. (a) Marketable title to the project must be vested in the mortgagor as of the date the mortgage is filed for record. (b) Title evidence for...
Systems budgets architecture and development for the Maunakea Spectroscopic Explorer
NASA Astrophysics Data System (ADS)
Mignot, Shan; Flagey, Nicolas; Szeto, Kei; Murowinski, Rick; McConnachie, Alan
2016-08-01
The Maunakea Spectroscopic Explorer (MSE) project is an enterprise to upgrade the existing Canada-France- Hawaii observatory into a spectroscopic facility based on a 10 meter-class telescope. As such, the project relies on engineering requirements not limited only to its instruments (the low, medium and high resolution spectrographs) but for the whole observatory. The science requirements, the operations concept, the project management and the applicable regulations are the basis from which these requirements are initially derived, yet they do not form hierarchies as each may serve several purposes, that is, pertain to several budgets. Completeness and consistency are hence the main systems engineering challenges for such a large project as MSE. Special attention is devoted to ensuring the traceability of requirements via parametric models, derivation documents, simulations, and finally maintaining KAOS diagrams and a database under IBM Rational DOORS linking them together. This paper will present the architecture of the main budgets under development and the associated processes, expand to highlight those that are interrelated and how the system, as a whole, is then optimized by modelling and analysis of the pertinent system parameters.
WFIRST Project Science Activities
NASA Technical Reports Server (NTRS)
Gehrels, Neil
2012-01-01
The WFIRST Project is a joint effort between GSFC and JPL. The project scientists and engineers are working with the community Science Definition Team to define the requirements and initial design of the mission. The objective is to design an observatory that meets the WFIRST science goals of the Astr02010 Decadal Survey for minimum cost. This talk will be a report of recent project activities including requirements flowdown, detector array development, science simulations, mission costing and science outreach. Details of the interim mission design relevant to scientific capabilities will be presented.
ERIC Educational Resources Information Center
Koehn, Peter H.; Deardorff, Darla K.; Bolognese, Kerry D.
2011-01-01
In the interconnected world of the UN Decade of Education for Sustainable Development, the ability of higher-education institutions to contribute to and benefit from international research undertakings, sustainable-development-project activity, and capacity-building endeavors requires transnational involvement. While the potential benefits are…
Tools for Supporting Distributed Agile Project Planning
NASA Astrophysics Data System (ADS)
Wang, Xin; Maurer, Frank; Morgan, Robert; Oliveira, Josyleuda
Agile project planning plays an important part in agile software development. In distributed settings, project planning is severely impacted by the lack of face-to-face communication and the inability to share paper index cards amongst all meeting participants. To address these issues, several distributed agile planning tools were developed. The tools vary in features, functions and running platforms. In this chapter, we first summarize the requirements for distributed agile planning. Then we give an overview on existing agile planning tools. We also evaluate existing tools based on tool requirements. Finally, we present some practical advices for both designers and users of distributed agile planning tools.
NASA Technical Reports Server (NTRS)
Goss, Ernest Preston
1991-01-01
The objectives were to: (1) survey state-of-the-art computing architectures, tools, and technologies for implementing an Executive Information System (EIS); (2) review MSFC capabilities and efforts in developing an EIS for Shuttle Projects Office and the Payloads Project Office; (3) review management reporting requirements for the NASA Accounting and Financial Information System (NAFIS) Project in the areas of cost, schedule, and technical performance, and insure that the EIS fully supports these requirements; and (4) develop and implement a pilot concept for a NAFIS EIS. A summary of the findings of this work is presented.
24 CFR 200.54 - Project completion funding.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT GENERAL INTRODUCTION TO FHA PROGRAMS Requirements for Application, Commitment, and... project and to pay the initial service charge, carrying charges, and legal and organizational expenses...
NASA Technical Reports Server (NTRS)
Tri, Terry O.; Thompson, Clifford D.
1992-01-01
Future NASA manned missions to the moon and Mars will require development of robust regenerative life support system technologies which offer high reliability and minimal resupply. To support the development of such systems, early ground-based test facilities will be required to demonstrate integrated, long-duration performance of candidate regenerative air revitalization, water recovery, and thermal management systems. The advanced life support Systems Integration Research Facility (SIRF) is one such test facility currently being developed at NASA's Johnson Space Center. The SIRF, when completed, will accommodate unmanned and subsequently manned integrated testing of advanced regenerative life support technologies at ambient and reduced atmospheric pressures. This paper provides an overview of the SIRF project, a top-level description of test facilities to support the project, conceptual illustrations of integrated test article configurations for each of the three SIRF systems, and a phased project schedule denoting projected activities and milestones through the next several years.
Dudal, Sherri; Staack, Roland F; Stoellner, Daniela; Fjording, Marianne Scheel; Vieser, Eva; Pascual, Marie-Hélène; Brudny-Kloeppel, Margarete; Golob, Michaela
2014-05-01
The bioanalytical scientist plays a key role in the project team for the drug development of biotherapeutics from the discovery to the marketing phase. Information from the project team members is required for assay development and sample analysis during the discovery, preclinical and clinical phases of the project and input is needed from the bioanalytical scientist to help data interpretation. The European Bioanalysis Forum target team 20 discussed many of the gaps in information and communication between the bioanalytical scientist and project team members as a base for providing a perspective on the bioanalytical scientist's role and interactions within the project team.
24 CFR 965.302 - Requirements for energy audits.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Requirements for energy audits. 965... URBAN DEVELOPMENT PHA-OWNED OR LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.302 Requirements for energy audits. All PHAs shall complete an energy audit for each PHA...
24 CFR 965.302 - Requirements for energy audits.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Requirements for energy audits. 965... URBAN DEVELOPMENT PHA-OWNED OR LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.302 Requirements for energy audits. All PHAs shall complete an energy audit for each PHA...
24 CFR 965.302 - Requirements for energy audits.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Requirements for energy audits. 965... URBAN DEVELOPMENT PHA-OWNED OR LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.302 Requirements for energy audits. All PHAs shall complete an energy audit for each PHA...
24 CFR 965.302 - Requirements for energy audits.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Requirements for energy audits. 965... URBAN DEVELOPMENT PHA-OWNED OR LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.302 Requirements for energy audits. All PHAs shall complete an energy audit for each PHA...
24 CFR 965.302 - Requirements for energy audits.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Requirements for energy audits. 965... URBAN DEVELOPMENT PHA-OWNED OR LEASED PROJECTS-GENERAL PROVISIONS Energy Audits and Energy Conservation Measures § 965.302 Requirements for energy audits. All PHAs shall complete an energy audit for each PHA...
24 CFR 965.101 - Preemption of State prevailing wage requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Preemption of State prevailing wage... URBAN DEVELOPMENT PHA-OWNED OR LEASED PROJECTS-GENERAL PROVISIONS Preemption of State Prevailing Wage Requirements § 965.101 Preemption of State prevailing wage requirements. (a) A prevailing wage rate including...
24 CFR 200.76 - Smoke detectors.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Smoke detectors. 200.76 Section 200.76 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Eligibility Requirements for Existing Projects Property Requirements § 200.76 Smoke detectors. Smoke detectors...
24 CFR 200.76 - Smoke detectors.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Smoke detectors. 200.76 Section 200.76 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Eligibility Requirements for Existing Projects Property Requirements § 200.76 Smoke detectors. Smoke detectors...
24 CFR 200.76 - Smoke detectors.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Smoke detectors. 200.76 Section 200.76 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Eligibility Requirements for Existing Projects Property Requirements § 200.76 Smoke detectors. Smoke detectors...
24 CFR 200.76 - Smoke detectors.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Smoke detectors. 200.76 Section 200.76 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Eligibility Requirements for Existing Projects Property Requirements § 200.76 Smoke detectors. Smoke detectors...
24 CFR 200.76 - Smoke detectors.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Smoke detectors. 200.76 Section 200.76 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Eligibility Requirements for Existing Projects Property Requirements § 200.76 Smoke detectors. Smoke detectors...
Functions & Requirements for Debris Removal System Project A-2
DOE Office of Scientific and Technical Information (OSTI.GOV)
PRECECHTEL, D.R.
1999-12-29
This revision of the Functions and Requirements Document updates the approved Functions and Requirements for Debris Removal Subproject WHC-SD-SNF-FRD-009, Rev. 0. It has been revised in its entirety to reflect the current scope of work for Debris Removal as canisters and lids under the K Basin Projects work breakdown structure (WBS). In this revision the canisters and lids will be consider debris and a new set of Functions and Requirements have been developed to remove the canisters and lids from the basin.
Controlled Ecological Life Support System Breadboard Project - 1988
NASA Technical Reports Server (NTRS)
Knott, W. M.
1989-01-01
The Controlled Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989-1993 are listed. The biomass production chamber to be used by the project is described.
NASA Technical Reports Server (NTRS)
Klem, Mark D.; Smith, Timothy D.
2008-01-01
The Propulsion and Cryogenics Advanced Development (PCAD) Project in the Exploration Technology Development Program is developing technologies as risk mitigation for Orion and the Lunar Lander. An integrated main and reaction control propulsion system has been identified as a candidate for the Lunar Lander Ascent Module. The propellants used in this integrated system are Liquid Oxygen (LOX)/Liquid Methane (LCH4) propellants. A deep throttle pump fed Liquid Oxygen (LOX)/Liquid Hydrogen (LH2) engine system has been identified for the Lunar Lander Descent Vehicle. The propellant combination and architecture of these propulsion systems are novel and would require risk reduction prior to detailed design and development. The PCAD Project addresses the technology requirements to obtain relevant and necessary test data to further the technology maturity of propulsion hardware utilizing these propellants. This plan and achievements to date will be presented.
Advanced Caution and Warning System, Final Report - 2011
NASA Technical Reports Server (NTRS)
Spirkovska, Lilly; Aaseng, Gordon; Iverson, David; McCann, Robert S.; Robinson, Peter; Dittemore, Gary; Liolios, Sotirios; Baskaran, Vijay; Johnson, Jeremy; Lee, Charles;
2013-01-01
The work described in this report is a continuation of the ACAWS work funded in fiscal year (FY) 2010 under the Exploration Technology Development Program (ETDP), Integrated Systems Health Management (ISHM) project. In FY 2010, we developed requirements for an ACAWS system and vetted the requirements with potential users via a concept demonstration system. In FY 2011, we developed a working prototype of aspects of that concept, with placeholders for technologies to be fully developed in future phases of the project. The objective is to develop general capability to assist operators with system health monitoring and failure diagnosis. Moreover, ACAWS was integrated with the Discrete Controls (DC) task of the Autonomous Systems and Avionics (ASA) project. The primary objective of DC is to demonstrate an electronic and interactive procedure display environment and multiple levels of automation (automatic execution by computer, execution by computer if the operator consents, and manual execution by the operator).
Innovative space x-ray telescopes
NASA Astrophysics Data System (ADS)
Hudec, R.; Inneman, A.; Pina, L.; Sveda, L.; Ticha, H.; Brozek, V.
2017-11-01
We report on the progress in innovative X-ray mirror development with focus on requirements of future X-ray astronomy space projects. Various future projects in X-ray astronomy and astrophysics will require large lightweight but highly accurate segments with multiple thin shells or foils. The large Wolter 1 grazing incidence multiple mirror arrays, the Kirkpatrick-Baez modules, as well as the large Lobster-Eye X-ray telescope modules in Schmidt arrangement may serve as examples. All these space projects will require high quality and light segmented shells (shaped, bent or flat foils) with high X-ray reflectivity and excellent mechanical stability.
Overview 1993: Computational applications
NASA Technical Reports Server (NTRS)
Benek, John A.
1993-01-01
Computational applications include projects that apply or develop computationally intensive computer programs. Such programs typically require supercomputers to obtain solutions in a timely fashion. This report describes two CSTAR projects involving Computational Fluid Dynamics (CFD) technology. The first, the Parallel Processing Initiative, is a joint development effort and the second, the Chimera Technology Development, is a transfer of government developed technology to American industry.
Case Study of 'Engineering Peer Meetings' in JPL's ST-6 Project
NASA Technical Reports Server (NTRS)
Chao, Lawrence P.; Tumer, Irem
2004-01-01
This design process error-proofing case study describes a design review practice implemented by a project manager at NASA Jet Propulsion Laboratory. There are many types of reviews at NASA: required and not, formalized and informal, programmatic and technical. Standing project formal reviews such as the Preliminary Design Review (PDR) and Critical Design Review (CDR) are a required part of every project and mission development. However, the engineering peer reviews that support teams technical work on such projects are often informal, ad hoc, and inconsistent across the organization. This case study discusses issues and innovations identified by a project manager at JPL and implemented in 'engineering peer meetings' for his group.
Case Study of "Engineering Peer Meetings" in JPL's ST-6 Project
NASA Technical Reports Server (NTRS)
Tumer, Irem Y.; Chao, Lawrence P.
2003-01-01
This design process error-proofing case study describes a design review practice implemented by a project manager at NASA Jet Propulsion Laboratory. There are many types of reviews at NASA: required and not, formalized and informal, programmatic and technical. Standing project formal reviews such as the Preliminary Design Review (PDR) and Critical Design Review (CDR) are a required part of every project and mission development. However, the engineering peer reviews that support teams technical work on such projects are often informal, ad hoc, and inconsistent across the organization. This case study discusses issues and innovations identified by a project manager at JPL and implemented in "engineering peer meetings" for his group.
Code of Federal Regulations, 2010 CFR
2010-04-01
... assistance programs, except for the moderate rehabilitation and the project-based certificate or voucher... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Section 8 project-based assistance... Disabilities: Family Income and Family Payment; Occupancy Requirements for Section 8 Project-Based Assistance...
Code of Federal Regulations, 2011 CFR
2011-04-01
... assistance programs, except for the moderate rehabilitation and the project-based certificate or voucher... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Section 8 project-based assistance... Disabilities: Family Income and Family Payment; Occupancy Requirements for Section 8 Project-Based Assistance...
Communication Scaffolds for Project Management in PBL
ERIC Educational Resources Information Center
Sasaki, Shigeru; Arai, Masayuki; Takai, Kumiko; Ogawa, Mitsuhiro; Watanabe, Hiroyoshi
2017-01-01
In this study, the role-playing situation and the system requirement list are adopted into project-based learning classes to develop web applications. In the classes, the third-year undergraduate project managers communicate with the client of the project rolled by teachers on the Web bulletin board. These are expected to act as scaffolds to…
ERIC Educational Resources Information Center
Chen, Chung-Yang; Teng, Kao-Chiuan
2011-01-01
This paper presents a computerized tool support, the Meetings-Flow Project Collaboration System (MFS), for designing, directing and sustaining the collaborative teamwork required in senior projects in software engineering (SE) education. Among many schools' SE curricula, senior projects serve as a capstone course that provides comprehensive…
IUS/TUG orbital operations and mission support study. Volume 4: Project planning data
NASA Technical Reports Server (NTRS)
1975-01-01
Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.
Beyond Portfolios: A Practical Look at Student Projects as Teaching and Evaluation Devices (Part 2).
ERIC Educational Resources Information Center
Tillyer, Anthea; Sokolik, Maggi
1993-01-01
Steps required for developing a successful project class are described, beginning with an examination of how to use student writing projects with lower proficiency learners. A discussion of how projects can best be used as teaching and evaluation instruments in higher level classes is followed by examples of specific projects and styles. (Contains…
24 CFR 92.210 - Troubled HOME-assisted rental housing projects.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Troubled HOME-assisted rental... of Housing and Urban Development HOME INVESTMENT PARTNERSHIPS PROGRAM Program Requirements Eligible and Prohibited Activities § 92.210 Troubled HOME-assisted rental housing projects. (a) The provisions...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Marketing. 884.214 Section 884.214... HOUSING PROJECTS Project Development and Operation § 884.214 Marketing. (a) Compliance with equal opportunity requirements. Marketing of units and selection of Families by the Owner shall be in accordance...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Marketing. 884.214 Section 884.214... HOUSING PROJECTS Project Development and Operation § 884.214 Marketing. (a) Compliance with equal opportunity requirements. Marketing of units and selection of Families by the Owner shall be in accordance...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Marketing. 884.214 Section 884.214... HOUSING PROJECTS Project Development and Operation § 884.214 Marketing. (a) Compliance with equal opportunity requirements. Marketing of units and selection of Families by the Owner shall be in accordance...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Marketing. 884.214 Section 884.214... HOUSING PROJECTS Project Development and Operation § 884.214 Marketing. (a) Compliance with equal opportunity requirements. Marketing of units and selection of Families by the Owner shall be in accordance...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Marketing. 884.214 Section 884.214... HOUSING PROJECTS Project Development and Operation § 884.214 Marketing. (a) Compliance with equal opportunity requirements. Marketing of units and selection of Families by the Owner shall be in accordance...
Projecting manpower to attain quality
NASA Technical Reports Server (NTRS)
Rone, K. Y.
1983-01-01
The resulting model is useful as a projection tool but must be validated in order to be used as an on-going software cost engineering tool. A procedure is developed to facilitate the tracking of model projections and actual data to allow the model to be tuned. Finally, since the model must be used in an environment of overlapping development activities on a progression of software elements in development and maintenance, a manpower allocation model is developed for use in a steady state development/maintenance environment. In these days of soaring software costs it becomes increasingly important to properly manage a software development project. One element of the management task is the projection and tracking of manpower required to perform the task. In addition, since the total cost of the task is directly related to the initial quality built into the software, it becomes a necessity to project the development manpower in a way to attain that quality. An approach to projecting and tracking manpower with quality in mind is described.
Development of a volumetric projection technique for the digital evaluation of field of view.
Marshall, Russell; Summerskill, Stephen; Cook, Sharon
2013-01-01
Current regulations for field of view requirements in road vehicles are defined by 2D areas projected on the ground plane. This paper discusses the development of a new software-based volumetric field of view projection tool and its implementation within an existing digital human modelling system. In addition, the exploitation of this new tool is highlighted through its use in a UK Department for Transport funded research project exploring the current concerns with driver vision. Focusing specifically on rearwards visibility in small and medium passenger vehicles, the volumetric approach is shown to provide a number of distinct advantages. The ability to explore multiple projections of both direct vision (through windows) and indirect vision (through mirrors) provides a greater understanding of the field of view environment afforded to the driver whilst still maintaining compatibility with the 2D projections of the regulatory standards. Field of view requirements for drivers of road vehicles are defined by simplified 2D areas projected onto the ground plane. However, driver vision is a complex 3D problem. This paper presents the development of a new software-based 3D volumetric projection technique and its implementation in the evaluation of driver vision in small- and medium-sized passenger vehicles.
Christensen, Tom; Grimsmo, Anders
2005-01-01
User participation is important for developing a functional requirements specification for electronic communication. General practitioners and practising specialists, however, often work in small practices without the resources to develop and present their requirements. It was necessary to find a method that could engage practising doctors in order to promote their needs related to electronic communication. Qualitative research methods were used, starting a process to develop and study documents and collect data from meetings in project groups. Triangulation was used, in that the participants were organised into a panel of experts, a user group, a supplier group and an editorial committee. The panel of experts created a list of functional requirements for electronic communication in health care, consisting of 197 requirements, in addition to 67 requirements selected from an existing Norwegian standard for electronic patient records (EPRs). Elimination of paper copies sent in parallel with electronic messages, optimal workflow, a common electronic 'envelope' with directory services for units and end-users, and defined requirements for content with the possibility of decision support were the most important requirements. The results indicate that we have found a method of developing functional requirements which provides valid results both for practising doctors and for suppliers of EPR systems.
Nascom System Development Plan: System Description, Capabilities and Plans
NASA Technical Reports Server (NTRS)
1995-01-01
The NASA Communications (Nascom) System Development Plan (NSDP), reissued annually, describes the organization of Nascom, how it obtains communication services, its current systems, its relationship with other NASA centers and International Partner Agencies, some major spaceflight projects which generate significant operational communication support requirements, and major Nascom projects in various stages of development or implementation.
Resolving the problem of compliance with the ever increasing and changing regulations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Leigh, H.
1991-06-01
The most common problem identified at several US Department of Energy (DOE) sites is regulatory compliance. Simply, the project viability depends on identifying regulatory requirements at the beginning of a specific project to avoid possible delays and cost overruns. The Radioisotope Power Systems Facility (RFSP) is using the Regulatory Compliance System (RCS) to deal with the problem that well over 1000 regulatory documents had to be reviewed for possible compliance requirements applicable to the facility. This overwhelming number of possible documents is not atypical of all DOE facilities thus far reviewed using the RCS system. The RCS was developed tomore » provide a control and tracking of all the regulatory and institutional requirements on a given project. WASTREN, Inc., developed the RCS through various DOE contracts and continues to enhance and update the system for existing and new contracts. The RCS provides the information to allow the technical expert to assimilate and manage accurate resource information, compile the checklists, and document that the project or facility fulfills all of the appropriate regulatory requirements. The RCS provides on-line information, including status throughput the project life, thereby allowing more intelligent and proactive decision making. Also, consistency and traceability are provided for regulatory compliance documentation. 1 ref., 1 fig.« less
Synesthetic art through 3-D projection: The requirements of a computer-based supermedium
NASA Technical Reports Server (NTRS)
Mallary, Robert
1989-01-01
A computer-based form of multimedia art is proposed that uses the computer to fuse aspects of painting, sculpture, dance, music, film, and other media into a one-to-one synthesia of image and sound for spatially synchronous 3-D projection. Called synesthetic art, this conversion of many varied media into an aesthetically unitary experience determines the character and requirements of the system and its software. During the start-up phase, computer stereographic systems are unsuitable for software development. Eventually, a new type of illusory-projective supermedium will be required to achieve the needed combination of large-format projection and convincing real life presence, and to handle the vast amount of 3-D visual and acoustic information required. The influence of the concept on the author's research and creative work is illustrated through two examples.
Implementing Livestock Anaerobic Digestion Projects
Page provides information to help make an informed decision about installing an anaerobic digester. Is it a good match for a farm’s organic waste, project financing, development guidelines and permit requirements?
DOT National Transportation Integrated Search
1974-01-01
This report is one of a series developed in conformance with annual reporting requirements contained within Alcohol Safety Action Projects: Evaluation. In February 1972, operations of the Fairfax Alcohol Safety Action Project began and these federall...
A Manhattan Project in Educational Technology, Part II.
ERIC Educational Resources Information Center
Roberts, Wesley K.
The initial four phases of the Training Extension Course (TEC), a project to remedy deficiencies in training programs for armed forces recruits, employed systematic instructional development and extensive audiovisual resources. The project required subcontracting for lesson production and modifications in personnel and budgeting. Posttest evidence…
Accuracy Improvement of Neutron Nuclear Data on Minor Actinides
NASA Astrophysics Data System (ADS)
Harada, Hideo; Iwamoto, Osamu; Iwamoto, Nobuyuki; Kimura, Atsushi; Terada, Kazushi; Nakao, Taro; Nakamura, Shoji; Mizuyama, Kazuhito; Igashira, Masayuki; Katabuchi, Tatsuya; Sano, Tadafumi; Takahashi, Yoshiyuki; Takamiya, Koichi; Pyeon, Cheol Ho; Fukutani, Satoshi; Fujii, Toshiyuki; Hori, Jun-ichi; Yagi, Takahiro; Yashima, Hiroshi
2015-05-01
Improvement of accuracy of neutron nuclear data for minor actinides (MAs) and long-lived fission products (LLFPs) is required for developing innovative nuclear system transmuting these nuclei. In order to meet the requirement, the project entitled as "Research and development for Accuracy Improvement of neutron nuclear data on Minor ACtinides (AIMAC)" has been started as one of the "Innovative Nuclear Research and Development Program" in Japan at October 2013. The AIMAC project team is composed of researchers in four different fields: differential nuclear data measurement, integral nuclear data measurement, nuclear chemistry, and nuclear data evaluation. By integrating all of the forefront knowledge and techniques in these fields, the team aims at improving the accuracy of the data. The background and research plan of the AIMAC project are presented.
[Advanced information technologies for financial services industry]. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The project scope is to develop an advanced user interface utilizing speech and/or handwriting recognition technology that will improve the accuracy and speed of recording transactions in the dynamic environment of a foreign exchange (FX) trading floor. The project`s desired result is to improve the base technology for trader`s workstations on FX trading floors. Improved workstation effectiveness will allow vast amounts of complex information and events to be presented and analyzed, thus increasing the volume of money and other assets to be exchanged at an accelerated rate. The project scope is to develop and demonstrate technologies that advance interbank checkmore » imaging and paper check truncation. The following describes the tasks to be completed: (1) Identify the economics value case, the legal and regulatory issues, the business practices that are affected, and the effects upon settlement. (2) Familiarization with existing imaging technology. Develop requirements for image quality, security, and interoperability. Adapt existing technologies to meet requirements. (3) Define requirements for the imaging laboratory and design its architecture. Integrate and test technology from task 2 with equipment in the laboratory. (4) Develop and/or integrate and test remaining components; includes security, storage, and communications. (5) Build a prototype system and test in a laboratory. Install and run in two or more banks. Develop documentation. Conduct training. The project`s desired result is to enable a proof-of-concept trial in which multiple banks will exchange check images, exhibiting operating conditions which a check experiences as it travels through the payments/clearing system. The trial should demonstrate the adequacy of digital check images instead of paper checks.« less
Parametric Modeling for Fluid Systems
NASA Technical Reports Server (NTRS)
Pizarro, Yaritzmar Rosario; Martinez, Jonathan
2013-01-01
Fluid Systems involves different projects that require parametric modeling, which is a model that maintains consistent relationships between elements as is manipulated. One of these projects is the Neo Liquid Propellant Testbed, which is part of Rocket U. As part of Rocket U (Rocket University), engineers at NASA's Kennedy Space Center in Florida have the opportunity to develop critical flight skills as they design, build and launch high-powered rockets. To build the Neo testbed; hardware from the Space Shuttle Program was repurposed. Modeling for Neo, included: fittings, valves, frames and tubing, between others. These models help in the review process, to make sure regulations are being followed. Another fluid systems project that required modeling is Plant Habitat's TCUI test project. Plant Habitat is a plan to develop a large growth chamber to learn the effects of long-duration microgravity exposure to plants in space. Work for this project included the design and modeling of a duct vent for flow test. Parametric Modeling for these projects was done using Creo Parametric 2.0.
Flat-plate solar array project. Volume 5: Process development
NASA Technical Reports Server (NTRS)
Gallagher, B.; Alexander, P.; Burger, D.
1986-01-01
The goal of the Process Development Area, as part of the Flat-Plate Solar Array (FSA) Project, was to develop and demonstrate solar cell fabrication and module assembly process technologies required to meet the cost, lifetime, production capacity, and performance goals of the FSA Project. R&D efforts expended by Government, Industry, and Universities in developing processes capable of meeting the projects goals during volume production conditions are summarized. The cost goals allocated for processing were demonstrated by small volume quantities that were extrapolated by cost analysis to large volume production. To provide proper focus and coverage of the process development effort, four separate technology sections are discussed: surface preparation, junction formation, metallization, and module assembly.
13 CFR 306.5 - Award requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS University Center Economic Development Program § 306.5 Award requirements. EDA provides Investment Assistance to University Center Projects in...
13 CFR 306.5 - Award requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS University Center Economic Development Program § 306.5 Award requirements. EDA provides Investment Assistance to University Center Projects in...
13 CFR 306.5 - Award requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS University Center Economic Development Program § 306.5 Award requirements. EDA provides Investment Assistance to University Center Projects in...
Hanning, Sara M; Orlu Gul, Mine; Winslade, Jackie; Baarslag, Manuel A; Neubert, Antje; Tuleu, Catherine
2016-09-25
A Paediatric Investigation Plan (PIP) is a development plan that aims to ensure that sufficient data are obtained through studies in paediatrics to support the generation of marketing authorisation of medicines for children. This paper highlights some practical considerations and challenges with respect to PIP submissions and paediatric clinical trials during the pharmaceutical development phase, using the FP7-funded Clonidine for Sedation of Paediatric Patients in the Intensive Care Unit (CloSed) project as a case study. Examples discussed include challenges and considerations regarding formulation development, blinding and randomisation, product labelling and shipment and clinical trial requirements versus requirements for marketing authorisation. A significant quantity of information is required for PIP submissions and it is hoped that future applicants may benefit from an insight into some critical considerations and challenges faced in the CloSed project. Copyright © 2016 Elsevier B.V. All rights reserved.
The Course Development Plan: Macro-Level Decisions and Micro-Level Processes
ERIC Educational Resources Information Center
Franker, Karen; James, Dennis
2016-01-01
A key step in distance learning project management is the creation of a course development plan. The plan should account for decisions related to materials, curriculum, delivery methods, staffing, technology applications, resources, reporting lines, and project management--issues that may require administrator involvement and support, particularly…
76 FR 12217 - Exempt Discretionary Program Grants (Section 5309) for Urban Circulator Systems
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-04
... redevelopment of urban spaces into walkable mixed use, high density environments. FOR FURTHER INFORMATION... development. FTA's approval to advance the Urban Circulator projects through project development and grant... urban circulators shall be required to submit information that describes the impact of the urban...
A Coordinated Decentralized Approach to Online Project Development
ERIC Educational Resources Information Center
Mykota, David
2013-01-01
With the growth rate of online learning outpacing traditional face-to-face instruction, universities are beginning to recognize the importance of strategic planning in its development. Making the case for online learning requires sound project management practices and an understanding of the business models on which it is predicated. The objective…
41 CFR 102-71.20 - What definitions apply to GSA's real property policies?
Code of Federal Regulations, 2010 CFR
2010-07-01
... economic potential, qualitative values (social and environmental) inherent in the property itself, and..., and personnel employed at the site, and the requirements for preserving certain types of equipment... development projects, or for nuclear production, research, or development projects. (vi) On or used in...
SAGA: A project to automate the management of software production systems
NASA Technical Reports Server (NTRS)
Campbell, Roy H.; Beckman-Davies, C. S.; Benzinger, L.; Beshers, G.; Laliberte, D.; Render, H.; Sum, R.; Smith, W.; Terwilliger, R.
1986-01-01
Research into software development is required to reduce its production cost and to improve its quality. Modern software systems, such as the embedded software required for NASA's space station initiative, stretch current software engineering techniques. The requirements to build large, reliable, and maintainable software systems increases with time. Much theoretical and practical research is in progress to improve software engineering techniques. One such technique is to build a software system or environment which directly supports the software engineering process, i.e., the SAGA project, comprising the research necessary to design and build a software development which automates the software engineering process. Progress under SAGA is described.
36 CFR 801.3 - Applicant responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... HISTORIC PRESERVATION REQUIREMENTS OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.3 Applicant... expeditiously meeting its historic preservation requirements and facilitate the development of the Council's...) Consulting the National Register of Historic Places to determine whether the project's impact area includes...
36 CFR 801.3 - Applicant responsibilities.
Code of Federal Regulations, 2014 CFR
2014-07-01
... HISTORIC PRESERVATION REQUIREMENTS OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.3 Applicant... expeditiously meeting its historic preservation requirements and facilitate the development of the Council's...) Consulting the National Register of Historic Places to determine whether the project's impact area includes...
36 CFR 801.3 - Applicant responsibilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... HISTORIC PRESERVATION REQUIREMENTS OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.3 Applicant... expeditiously meeting its historic preservation requirements and facilitate the development of the Council's...) Consulting the National Register of Historic Places to determine whether the project's impact area includes...
36 CFR 801.3 - Applicant responsibilities.
Code of Federal Regulations, 2012 CFR
2012-07-01
... HISTORIC PRESERVATION REQUIREMENTS OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.3 Applicant... expeditiously meeting its historic preservation requirements and facilitate the development of the Council's...) Consulting the National Register of Historic Places to determine whether the project's impact area includes...
Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2013-03-01
To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understandingmore » of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-01
... DEPARTMENT OF AGRICULTURE Rural Housing Service Notice of a Project Waiver of Section 1605 (Buy... hospital renovation and expansion project. This is a project specific waiver under section 1605 (b)(2) of... Under Secretary for Rural Development has concurred in this decision to waive Section 1605 of ARRA. This...
DOT National Transportation Integrated Search
1992-06-01
The Aids to Navigation (ATON) Service Force Mix (SFM) 2000 Project is documented in a Project Overview and three separately bound volumes. This is Volume III. The Project Overview describes the purpose, approach, analysis, and results of the ATON SFM...
Advanced Public Transportation Systems. Technical Assistance Brief 2
DOT National Transportation Integrated Search
1993-01-01
The Advanced Public Transportation Systems (APTS) Program requires evaluation : of pilot projects. This technical assistance brief discusses the guidelines set : for developing evaluation framework and methodology for local projects. 4p.
ASC-ATDM Performance Portability Requirements for 2015-2019
DOE Office of Scientific and Technical Information (OSTI.GOV)
Edwards, Harold C.; Trott, Christian Robert
This report outlines the research, development, and support requirements for the Advanced Simulation and Computing (ASC ) Advanced Technology, Development, and Mitigation (ATDM) Performance Portability (a.k.a., Kokkos) project for 2015 - 2019 . The research and development (R&D) goal for Kokkos (v2) has been to create and demonstrate a thread - parallel programming model a nd standard C++ library - based implementation that enables performance portability across diverse manycore architectures such as multicore CPU, Intel Xeon Phi, and NVIDIA Kepler GPU. This R&D goal has been achieved for algorithms that use data parallel pat terns including parallel - for, parallelmore » - reduce, and parallel - scan. Current R&D is focusing on hierarchical parallel patterns such as a directed acyclic graph (DAG) of asynchronous tasks where each task contain s nested data parallel algorithms. This five y ear plan includes R&D required to f ully and performance portably exploit thread parallelism across current and anticipated next generation platforms (NGP). The Kokkos library is being evaluated by many projects exploring algorithm s and code design for NGP. Some production libraries and applications such as Trilinos and LAMMPS have already committed to Kokkos as their foundation for manycore parallelism an d performance portability. These five year requirements includes support required for current and antic ipated ASC projects to be effective and productive in their use of Kokkos on NGP. The greatest risk to the success of Kokkos and ASC projects relying upon Kokkos is a lack of staffing resources to support Kokkos to the degree needed by these ASC projects. This support includes up - to - date tutorials, documentation, multi - platform (hardware and software stack) testing, minor feature enhancements, thread - scalable algorithm consulting, and managing collaborative R&D.« less
Promoting Student Engagement through Scholarship in a Teacher Preparation Program
ERIC Educational Resources Information Center
Sanchez, Claudia; Olson-Pacheco, Ali; Grosso, Liliana; Hanley, Elizabeth
2008-01-01
A project entitled "Academic Presentations and Publications by Leaders in Education" (Project APPLE) was developed to offer pre-service teachers opportunities to grow professionally outside traditional coursework requirements. Project APPLE seeks to engage students in teacher education programs in two types of scholarly activities: professional…
An Internet-Based Accounting Information Systems Project
ERIC Educational Resources Information Center
Miller, Louise
2012-01-01
This paper describes a student project assignment used in an accounting information systems course. We are now truly immersed in the internet age, and while many required accounting information systems courses and textbooks introduce database design, accounting software development, cloud computing, and internet security, projects involving the…
Countermeasure Evaluation and Validation Project (CEVP) Database Requirement Documentation
NASA Technical Reports Server (NTRS)
Shin, Sung Y.
2003-01-01
The initial focus of the project by the JSC laboratories will be to develop, test and implement a standardized complement of integrated physiological test (Integrated Testing Regimen, ITR) that will examine both system and intersystem function, and will be used to validate and certify candidate countermeasures. The ITR will consist of medical requirements (MRs) and non-MR core ITR tests, and countermeasure-specific testing. Non-MR and countermeasure-specific test data will be archived in a database specific to the CEVP. Development of a CEVP Database will be critical to documenting the progress of candidate countermeasures. The goal of this work is a fully functional software system that will integrate computer-based data collection and storage with secure, efficient, and practical distribution of that data over the Internet. This system will provide the foundation of a new level of interagency and international cooperation for scientific experimentation and research, providing intramural, international, and extramural collaboration through management and distribution of the CEVP data. The research performed this summer includes the first phase of the project. The first phase of the project is a requirements analysis. This analysis will identify the expected behavior of the system under normal conditions and abnormal conditions; that could affect the system's ability to produce this behavior; and the internal features in the system needed to reduce the risk of unexpected or unwanted behaviors. The second phase of this project have also performed in this summer. The second phase of project is the design of data entry screen and data retrieval screen for a working model of the Ground Data Database. The final report provided the requirements for the CEVP system in a variety of ways, so that both the development team and JSC technical management have a thorough understanding of how the system is expected to behave.
Guidance and Control Software Project Data - Volume 1: Planning Documents
NASA Technical Reports Server (NTRS)
Hayhurst, Kelly J. (Editor)
2008-01-01
The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.
Galloway, M J
2004-01-01
This guideline reviews the introduction and development of business planning in the National Health Service. A guideline for writing a business case for service development that would form part of a pathology business plan has been developed. This guideline outlines six steps that are required in the preparation of a business case. The format of the guideline has been developed largely from other national guidelines that have been published for the development of capital projects. In view of the publication of these guidelines, the scope of this guideline excludes business cases for information, management, and technology projects and large capital projects. PMID:15047731
DOE Office of Scientific and Technical Information (OSTI.GOV)
Irene Farnham
This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurancemore » Project Plan, Nevada Test Site, Nevada, Revision 4.« less
The advanced software development workstation project
NASA Technical Reports Server (NTRS)
Fridge, Ernest M., III; Pitman, Charles L.
1991-01-01
The Advanced Software Development Workstation (ASDW) task is researching and developing the technologies required to support Computer Aided Software Engineering (CASE) with the emphasis on those advanced methods, tools, and processes that will be of benefit to support all NASA programs. Immediate goals are to provide research and prototype tools that will increase productivity, in the near term, in projects such as the Software Support Environment (SSE), the Space Station Control Center (SSCC), and the Flight Analysis and Design System (FADS) which will be used to support the Space Shuttle and Space Station Freedom. Goals also include providing technology for development, evolution, maintenance, and operations. The technologies under research and development in the ASDW project are targeted to provide productivity enhancements during the software life cycle phase of enterprise and information system modeling, requirements generation and analysis, system design and coding, and system use and maintenance. On-line user's guides will assist users in operating the developed information system with knowledge base expert assistance.
Including information technology project management in the nursing informatics curriculum.
Sockolow, Paulina; Bowles, Kathryn H
2008-01-01
Project management is a critical skill for nurse informaticists who are in prominent roles developing and implementing clinical information systems. It should be included in the nursing informatics curriculum, as evidenced by its inclusion in informatics competencies and surveys of important skills for informaticists. The University of Pennsylvania School of Nursing includes project management in two of the four courses in the master's level informatics minor. Course content includes the phases of the project management process; the iterative unified process methodology; and related systems analysis and project management skills. During the introductory course, students learn about the project plan, requirements development, project feasibility, and executive summary documents. In the capstone course, students apply the system development life cycle and project management skills during precepted informatics projects. During this in situ experience, students learn, the preceptors benefit, and the institution better prepares its students for the real world.
NASA Technical Reports Server (NTRS)
1974-01-01
The SERT C (Space Electric Rocket Test - C) project study defines a spacecraft mission that would demonstrate the technology readiness of ion thruster systems for primary propulsion and station keeping applications. As a low cost precursor, SERT C develops the components and systems required for subsequent Solar Electric Propulsion (SEP) applications. The SERT C mission requirements and preliminary spacecraft and subsystem design are described.
Managing Large Scale Project Analysis Teams through a Web Accessible Database
NASA Technical Reports Server (NTRS)
O'Neil, Daniel A.
2008-01-01
Large scale space programs analyze thousands of requirements while mitigating safety, performance, schedule, and cost risks. These efforts involve a variety of roles with interdependent use cases and goals. For example, study managers and facilitators identify ground-rules and assumptions for a collection of studies required for a program or project milestone. Task leaders derive product requirements from the ground rules and assumptions and describe activities to produce needed analytical products. Disciplined specialists produce the specified products and load results into a file management system. Organizational and project managers provide the personnel and funds to conduct the tasks. Each role has responsibilities to establish information linkages and provide status reports to management. Projects conduct design and analysis cycles to refine designs to meet the requirements and implement risk mitigation plans. At the program level, integrated design and analysis cycles studies are conducted to eliminate every 'to-be-determined' and develop plans to mitigate every risk. At the agency level, strategic studies analyze different approaches to exploration architectures and campaigns. This paper describes a web-accessible database developed by NASA to coordinate and manage tasks at three organizational levels. Other topics in this paper cover integration technologies and techniques for process modeling and enterprise architectures.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-09-01
A five-year project plan was developed with extensive input from private industry. The objective of the project is to develop the industrial technology base required for reliable ceramics for application in advanced automotive heat engines. The project approach includes determining the mechanisms controlling reliability, improving processes for fabricating existing ceramics, developing new materials with increased reliability, and testing these materials in simulated engine environments to confirm reliability. Although this is a generic materials project, the focus is on structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments, and ceramic coatings for thermal barrier and wear applicationsmore » in these engines.« less
Space Station Mission Planning Study (MPS) development study. Volume 3: Software development plan
NASA Technical Reports Server (NTRS)
Klus, W. L.
1987-01-01
A software development plan is presented for the definition, design, and implementation of the Space Station (SS) Payload Mission Planning System (MPS). This plan is an evolving document and must be updated periodically as the SS design and operations concepts as well as the SS MPS concept evolve. The major segments of this plan are as follows: an overview of the SS MPS and a description of its required capabilities including the computer programs identified as configurable items with an explanation of the place and function of each within the system; an overview of the project plan and a detailed description of each development project activity breaking each into lower level tasks where applicable; identification of the resources required and recommendations for the manner in which they should be utilized including recommended schedules and estimated manpower requirements; and a description of the practices, standards, and techniques recommended for the SS MPS Software (SW) development.
An Integrated Approach to Exploration Launch Office Requirements Development
NASA Technical Reports Server (NTRS)
Holladay, Jon B.; Langford, Gary
2006-01-01
The proposed paper will focus on the Project Management and Systems Engineering approach utilized to develop a set of both integrated and cohesive requirements for the Exploration Launch Office, within the Constellation Program. A summary of the programmatic drivers which influenced the approach along with details of the resulting implementation will be discussed as well as metrics evaluating the efficiency and accuracy of the various requirements development activities. Requirements development activities will focus on the procedures utilized to ensure that technical content was valid and mature in preparation for the Crew Launch Vehicle and Constellation System s Requirements Reviews. This discussion will begin at initial requirements development during the Exploration Systems Architecture Study and progress through formal development of the program structure. Specific emphasis will be given to development and validation of the requirements. This discussion will focus on approaches to garner the appropriate requirement owners (or customers), project infrastructure utilized to emphasize proper integration, and finally the procedure to technically mature, verify and validate the requirements. Examples of requirements being implemented on the Launch Vehicle (systems, interfaces, test & verification) will be utilized to demonstrate the various processes and also provide a top level understanding of the launch vehicle(s) performance goals. Details may also be provided on the approaches for verification, which range from typical aerospace hardware development (qualification/acceptance) through flight certification (flight test, etc.). The primary intent of this paper is to provide a demonstrated procedure for the development of a mature, effective, integrated set of requirements on a complex system, which also has the added intricacies of both heritage and new hardware development integration. Ancillary focus of the paper will include discussion of Test and Verification approaches along with top level systems/elements performance capabilities.
7 CFR 762.141 - Reporting requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... certification stating that a cash flow projecting at least a feasible plan has been developed, that the borrower..., the cash flow for the borrower's operation that projects a feasible plan or better for the upcoming...
7 CFR 762.141 - Reporting requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... certification stating that a cash flow projecting at least a feasible plan has been developed, that the borrower..., the cash flow for the borrower's operation that projects a feasible plan or better for the upcoming...
7 CFR 762.141 - Reporting requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... certification stating that a cash flow projecting at least a feasible plan has been developed, that the borrower..., the cash flow for the borrower's operation that projects a feasible plan or better for the upcoming...
7 CFR 762.141 - Reporting requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... certification stating that a cash flow projecting at least a feasible plan has been developed, that the borrower..., the cash flow for the borrower's operation that projects a feasible plan or better for the upcoming...
The Outer Planetary Mission Design Project
NASA Astrophysics Data System (ADS)
Benfield, Michael; Turner, M. W.
2010-10-01
With the recent focus from the planetary science community on the outer planets of the solar system, The University of Alabama in Huntsville Integrated Product Team program is embarking on a new challenge to develop an outer planetary mission for the academic year 2010-2011. Currently four bodies are of interest for this mission: Titan, Europa, Triton, and Enceledus, with one body being chosen by the instructors by the beginning of the fall semester. This project will use the 2010 Discovery Announcement of Opportunity as its Request for Proposal (RFP). All of the teams competing in this project will use the AO to respond with a proposal to the instructors for their proposed mission and spacecraft concept. The project employs the two-semester design sequence of the IPT program to provide a framework for the development of this mission. This sequence is divided into four phases. Phase 1 - Requirements Development - focuses on the development of both the scientific and engineering requirements of the mission. During this phase the teams work very closely with the PI organization, represented by the College of Charleston. Phase 2 - Team Formation and Architecture Development - concentrates on the assessment of the overall mission architecture from the launch vehicle to the ground operations of the proposed spacecraft. Phase 3 - System Definition - provides for spacecraft subsystem trade studies and further refinement of the specific spacecraft to meet the scientific requirements and objectives developed in Phase 1. Phase 4 - Design - is the phase where the engineers provide the spacecraft design that is required for the mission of interest. At the conclusion of Phases 2 and 4, an external review board evaluates the proposed designs and chooses one winner of the competition.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies themore » close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M&O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [``Program`` refers to the CRWMS-wide activity and ``project`` refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project.« less
A measurement system for large, complex software programs
NASA Technical Reports Server (NTRS)
Rone, Kyle Y.; Olson, Kitty M.; Davis, Nathan E.
1994-01-01
This paper describes measurement systems required to forecast, measure, and control activities for large, complex software development and support programs. Initial software cost and quality analysis provides the foundation for meaningful management decisions as a project evolves. In modeling the cost and quality of software systems, the relationship between the functionality, quality, cost, and schedule of the product must be considered. This explicit relationship is dictated by the criticality of the software being developed. This balance between cost and quality is a viable software engineering trade-off throughout the life cycle. Therefore, the ability to accurately estimate the cost and quality of software systems is essential to providing reliable software on time and within budget. Software cost models relate the product error rate to the percent of the project labor that is required for independent verification and validation. The criticality of the software determines which cost model is used to estimate the labor required to develop the software. Software quality models yield an expected error discovery rate based on the software size, criticality, software development environment, and the level of competence of the project and developers with respect to the processes being employed.
The NASA CSTI high capacity power project
NASA Technical Reports Server (NTRS)
Winter, J.; Dudenhoefer, J.; Juhasz, A.; Schwarze, G.; Patterson, R.; Ferguson, D.; Titran, R.; Schmitz, P.; Vandersande, J.
1992-01-01
The SP-100 Space Nuclear Power Program was established in 1983 by DOD, DOE, and NASA as a joint program to develop technology for military and civil applications. Starting in 1986, NASA has funded a technology program to maintain the momentum of promising aerospace technology advancement started during Phase 1 of SP-100 and to strengthen, in key areas, the chances for successful development and growth capability of space nuclear reactor power systems for a wide range of future space applications. The elements of the Civilian Space Technology Initiative (CSTI) High Capacity Power Project include Systems Analysis, Stirling Power Conversion, Thermoelectric Power Conversion, Thermal Management, Power Management, Systems Diagnostics, Environmental Interactions, and Material/Structural Development. Technology advancement in all elements is required to provide the growth capability, high reliability and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall project will develop and demonstrate the technology base required to provide a wide range of modular power systems compatible with the SP-100 reactor which facilitates operation during lunar and planetary day/night cycles as well as allowing spacecraft operation at any attitude or distance from the sun. Significant accomplishments in all of the project elements will be presented, along with revised goals and project timelines recently developed.
The NASA CSTI high capacity power project
NASA Astrophysics Data System (ADS)
Winter, J.; Dudenhoefer, J.; Juhasz, A.; Schwarze, G.; Patterson, R.; Ferguson, D.; Titran, R.; Schmitz, P.; Vandersande, J.
1992-08-01
The SP-100 Space Nuclear Power Program was established in 1983 by DOD, DOE, and NASA as a joint program to develop technology for military and civil applications. Starting in 1986, NASA has funded a technology program to maintain the momentum of promising aerospace technology advancement started during Phase 1 of SP-100 and to strengthen, in key areas, the chances for successful development and growth capability of space nuclear reactor power systems for a wide range of future space applications. The elements of the Civilian Space Technology Initiative (CSTI) High Capacity Power Project include Systems Analysis, Stirling Power Conversion, Thermoelectric Power Conversion, Thermal Management, Power Management, Systems Diagnostics, Environmental Interactions, and Material/Structural Development. Technology advancement in all elements is required to provide the growth capability, high reliability and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall project will develop and demonstrate the technology base required to provide a wide range of modular power systems compatible with the SP-100 reactor which facilitates operation during lunar and planetary day/night cycles as well as allowing spacecraft operation at any attitude or distance from the sun. Significant accomplishments in all of the project elements will be presented, along with revised goals and project timelines recently developed.
NASA Technical Reports Server (NTRS)
Wolfe, M. G.
1978-01-01
The objectives of this study were to: (1) develop projections of the NASA, DoD, and civil space power requirements for the 1980-1995 time period; (2) identify specific areas of application and space power subsystem type needs for each prospective user; (3) document the supporting and historical base, including relevant cost related measures of performance; and (4) quantify the benefits of specific technology projection advancements. The initial scope of the study included: (1) construction of likely models for NASA, DoD, and civil space systems; (2) generation of a number of future scenarios; (3) extraction of time phased technology requirements based on the scenarios; and (4) cost/benefit analyses of some of the technologies identified.
Error Cost Escalation Through the Project Life Cycle
NASA Technical Reports Server (NTRS)
Stecklein, Jonette M.; Dabney, Jim; Dick, Brandon; Haskins, Bill; Lovell, Randy; Moroney, Gregory
2004-01-01
It is well known that the costs to fix errors increase as the project matures, but how fast do those costs build? A study was performed to determine the relative cost of fixing errors discovered during various phases of a project life cycle. This study used three approaches to determine the relative costs: the bottom-up cost method, the total cost breakdown method, and the top-down hypothetical project method. The approaches and results described in this paper presume development of a hardware/software system having project characteristics similar to those used in the development of a large, complex spacecraft, a military aircraft, or a small communications satellite. The results show the degree to which costs escalate, as errors are discovered and fixed at later and later phases in the project life cycle. If the cost of fixing a requirements error discovered during the requirements phase is defined to be 1 unit, the cost to fix that error if found during the design phase increases to 3 - 8 units; at the manufacturing/build phase, the cost to fix the error is 7 - 16 units; at the integration and test phase, the cost to fix the error becomes 21 - 78 units; and at the operations phase, the cost to fix the requirements error ranged from 29 units to more than 1500 units
McCall, Michael K.; Bressers, Hans Th. A.
2007-01-01
There is a growing assumption that payments for environmental services including carbon sequestration and greenhouse gas emission reduction provide an opportunity for poverty reduction and the enhancement of sustainable development within integrated natural resource management approaches. Yet in experiential terms, community-based natural resource management implementation falls short of expectations in many cases. In this paper, we investigate the asymmetry between community capacity and the Land Use Land Use Change Forestry (LULUCF) provisions of the Clean Development Mechanism within community forests in Cameroon. We use relevant aspects of the Clean Development Mechanism criteria and notions of “community capacity” to elucidate determinants of community capacity needed for CDM implementation within community forests. The main requirements are for community capacity to handle issues of additionality, acceptability, externalities, certification, and community organisation. These community capacity requirements are further used to interpret empirically derived insights on two community forestry cases in Cameroon. While local variations were observed for capacity requirements in each case, community capacity was generally found to be insufficient for meaningful uptake and implementation of Clean Development Mechanism projects. Implications for understanding factors that could inhibit or enhance community capacity for project development are discussed. We also include recommendations for the wider Clean Development Mechanism/Kyoto capacity building framework. PMID:17377732
Automated Estimation Of Software-Development Costs
NASA Technical Reports Server (NTRS)
Roush, George B.; Reini, William
1993-01-01
COSTMODL is automated software development-estimation tool. Yields significant reduction in risk of cost overruns and failed projects. Accepts description of software product developed and computes estimates of effort required to produce it, calendar schedule required, and distribution of effort and staffing as function of defined set of development life-cycle phases. Written for IBM PC(R)-compatible computers.
36 CFR § 801.3 - Applicant responsibilities.
Code of Federal Regulations, 2013 CFR
2013-07-01
... HISTORIC PRESERVATION REQUIREMENTS OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.3 Applicant... expeditiously meeting its historic preservation requirements and facilitate the development of the Council's...) Consulting the National Register of Historic Places to determine whether the project's impact area includes...
Advanced Avionics and Processor Systems for Space and Lunar Exploration
NASA Technical Reports Server (NTRS)
Keys, Andrew S.; Adams, James H.; Ray, Robert E.; Johnson, Michael A.; Cressler, John D.
2009-01-01
NASA's newly named Advanced Avionics and Processor Systems (AAPS) project, formerly known as the Radiation Hardened Electronics for Space Environments (RHESE) project, endeavors to mature and develop the avionic and processor technologies required to fulfill NASA's goals for future space and lunar exploration. Over the past year, multiple advancements have been made within each of the individual AAPS technology development tasks that will facilitate the success of the Constellation program elements. This paper provides a brief review of the project's recent technology advancements, discusses their application to Constellation projects, and addresses the project's plans for the coming year.
Research on the application of BIM technology in the whole life cycle of construction projects
NASA Astrophysics Data System (ADS)
Chang-liu, CHEN; Wei-wei, KOU; Shuai-hua, YE
2018-05-01
BIM technology can realize information sharing, and good BIM application will reduce the whole life cycle cost of construction projects. The popularization of BIM technology challenges the application of BIM technology at all stages of the whole life cycle of the construction project. It will give full play to the value of BIM, if developing a reasonable BIM project execution plan, defining BIM requirements, specifying Level of Development, determining the BIM quality control plan and clearing BIM application content of each stage, and will provide a unified method for project stakeholders, realize the whole life cycle of construction projects, and achieve the desired information sharing in construction project.
The Autonomous Precision Landing and Hazard Detection and Avoidance Technology (ALHAT)
NASA Technical Reports Server (NTRS)
Epp, Chirold D.; Smith, Thomas B.
2007-01-01
As NASA plans to send humans back to the Moon and develop a lunar outpost, technologies must be developed to place humans and cargo safely, precisely, repeatedly, on the lunar surface with the capability to avoid surface hazards. Exploration Space Architecture Study requirements include the need for global lunar surface access with safe, precise landing without lighting constraints on terrain that may have landing hazards for human scale landing vehicles. Landing accuracies of perhaps 1,000 meters for sortie crew missions to 10 s of meters for Outpost class missions are required. The Autonomous precision Landing Hazard Avoidance Technology (ALHAT) project will develop the new and unique descent and landing Guidance, Navigation and Control (GNC) hardware and software technologies necessary for these capabilities. The ALHAT project will qualify a lunar descent and landing GNC system to a Technology Readiness Level (TRL) of 6 capable of supporting lunar crewed, cargo, and robotic missions. The (ALHAT) development project was chartered by NASA Headquarters in October 2006. The initial effort to write a project plan and define an ALHAT Team was followed by a fairly aggressive research and analysis effort to determine what technologies existed that could be developed and applied to the lunar landing problems indicated above. This paper describes the project development, research, analysis and concept evolution that has occurred since the assignment of the project. This includes the areas of systems engineering, GNC, sensors, sensor algorithms, simulations, fielding testing, laboratory testing, Hardware-In-The-Loop testing, system avionics and system certification concepts.
7 CFR 1948.78 - Growth management and housing planning projects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...
Well Elderly Integrated Training Project. Final Report.
ERIC Educational Resources Information Center
Summit-Portage Area Health Education Network, Akron, OH.
The Well Elderly Integrated Training Project was conceptualized as a service-oriented endeavor with an evaluation component. The project required that a university medical school resource faculty develop an integrated training program and materials on health education (wellness) for trainers who were respected, healthy elderly high in the senior…
Curriculum Guide for Hospitality Education. Part I. Exemplary Project.
ERIC Educational Resources Information Center
Kalani, Henry
A research project was designed to develop a hospitality education program model for Hawaii's community colleges. Primary data were gathered in a survey of the hospitality industry characteristics, manpower requirements, and training needs. This report of the project covers the following information: history and growth of the hospitality industry…
24 CFR 266.310 - Insurance of advances or insurance upon completion; applicability of requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Processing, Development, and Approval § 266.310 Insurance of... projects involving new construction or substantial rehabilitation. Existing projects without the need for...
7 CFR 1948.78 - Growth management and housing planning projects.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 13 2013-01-01 2013-01-01 false Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...
7 CFR 1948.78 - Growth management and housing planning projects.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 13 2012-01-01 2012-01-01 false Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...
7 CFR 1948.78 - Growth management and housing planning projects.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 13 2011-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...
7 CFR 1948.78 - Growth management and housing planning projects.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 13 2014-01-01 2013-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...
24 CFR 200.54 - Project completion funding.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Project completion funding. 200.54... Project completion funding. (a) Except as provided in paragraph (d) of this section, the mortgagor shall... conditions established by the Commissioner, where the required funding is to be provided by a grant or loan...
24 CFR 200.54 - Project completion funding.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Project completion funding. 200.54... Project completion funding. (a) Except as provided in paragraph (d) of this section, the mortgagor shall... conditions established by the Commissioner, where the required funding is to be provided by a grant or loan...
Development and analysis of SCR requirements tables for system scenarios
NASA Technical Reports Server (NTRS)
Callahan, John R.; Morrison, Jeffery L.
1995-01-01
We describe the use of scenarios to develop and refine requirement tables for parts of the Earth Observing System Data and Information System (EOSDIS). The National Aeronautics and Space Administration (NASA) is developing EOSDIS as part of its Mission-To-Planet-Earth (MTPE) project to accept instrument/platform observation requests from end-user scientists, schedule and perform requested observations of the Earth from space, collect and process the observed data, and distribute data to scientists and archives. Current requirements for the system are managed with tools that allow developers to trace the relationships between requirements and other development artifacts, including other requirements. In addition, the user community (e.g., earth and atmospheric scientists), in conjunction with NASA, has generated scenarios describing the actions of EOSDIS subsystems in response to user requests and other system activities. As part of a research effort in verification and validation techniques, this paper describes our efforts to develop requirements tables from these scenarios for the EOSDIS Core System (ECS). The tables specify event-driven mode transitions based on techniques developed by the Naval Research Lab's (NRL) Software Cost Reduction (SCR) project. The SCR approach has proven effective in specifying requirements for large systems in an unambiguous, terse format that enhance identification of incomplete and inconsistent requirements. We describe development of SCR tables from user scenarios and identify the strengths and weaknesses of our approach in contrast to the requirements tracing approach. We also evaluate the capabilities of both approach to respond to the volatility of requirements in large, complex systems.
DeLonay, Aaron J.; Jacobson, Robert B.; Papoulias, Diana M.; Wildhaber, Mark L.; Chojnacki, Kimberly A.; Pherigo, Emily K.; Haas, Justin D.; Mestl, Gerald E.
2012-01-01
The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The project strategy integrates field and laboratory studies of sturgeon reproductive ecology, early life history, habitat requirements, and physiology. The project scope of work is developed annually with cooperating research partners and in collaboration with the U.S. Army Corps of Engineers, Missouri River Recovery—Integrated Science Program. The research consists of several interdependent and complementary tasks that engage multiple disciplines. The research tasks in the 2010 scope of work primarily address spawning as a probable factor limiting pallid sturgeon survival and recovery, although limited pilot studies also have been initiated to examine the requirements of early life stages. The research is designed to inform management decisions affecting channel re-engineering, flow modification, and pallid sturgeon population augmentation on the Missouri River, and throughout the range of the species. Research and progress made through this project are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by the Comprehensive Sturgeon Research Project during 2010.
NASA Technical Reports Server (NTRS)
Mcgreevy, Michael W.
1990-01-01
An advanced human-system interface is being developed for evolutionary Space Station Freedom as part of the NASA Office of Space Station (OSS) Advanced Development Program. The human-system interface is based on body-pointed display and control devices. The project will identify and document the design accommodations ('hooks and scars') required to support virtual workstations and telepresence interfaces, and prototype interface systems will be built, evaluated, and refined. The project is a joint enterprise of Marquette University, Astronautics Corporation of America (ACA), and NASA's ARC. The project team is working with NASA's JSC and McDonnell Douglas Astronautics Company (the Work Package contractor) to ensure that the project is consistent with space station user requirements and program constraints. Documentation describing design accommodations and tradeoffs will be provided to OSS, JSC, and McDonnell Douglas, and prototype interface devices will be delivered to ARC and JSC. ACA intends to commercialize derivatives of the interface for use with computer systems developed for scientific visualization and system simulation.
The Role of Lunar Development in Human Exploration of the Solar System
NASA Technical Reports Server (NTRS)
Mendell, Wendell W.
1999-01-01
Human exploration of the solar system can be said to have begun with the Apollo landings on the Moon. The Apollo Project was publicly funded with the narrow technical objective of landing human beings on the Moon. The transportation and life support systems were specialized technical designs, developed in a project management environment tailored to that objective. Most scenarios for future human exploration assume a similar long-term commitment of public funds to a narrowly focused project managed by a large, monolithic organization. Advocates of human exploration of space have not yet been successful in generating the political momentum required to initiate such a project to go to the Moon or to Mars. Alternative scenarios of exploration may relax some or all of the parameters of organizational complexity, great expense, narrow technical focus, required public funding, and control by a single organization. Development of the Moon using private investment is quite possibly a necessary condition for alternative scenarios to succeed.
48 CFR 323.7002 - Actions required.
Code of Federal Regulations, 2014 CFR
2014-10-01
... requirements: (1) Services or products. (2) Research, development, or test projects. (3) Transportation of... contract; (2) Evaluating a prospective contractor's safety and health programs; and (3) Conducting post...
48 CFR 323.7002 - Actions required.
Code of Federal Regulations, 2012 CFR
2012-10-01
... requirements: (1) Services or products. (2) Research, development, or test projects. (3) Transportation of... contract; (2) Evaluating a prospective contractor's safety and health programs; and (3) Conducting post...
48 CFR 323.7002 - Actions required.
Code of Federal Regulations, 2013 CFR
2013-10-01
... requirements: (1) Services or products. (2) Research, development, or test projects. (3) Transportation of... contract; (2) Evaluating a prospective contractor's safety and health programs; and (3) Conducting post...
48 CFR 323.7002 - Actions required.
Code of Federal Regulations, 2011 CFR
2011-10-01
... requirements: (1) Services or products. (2) Research, development, or test projects. (3) Transportation of... contract; (2) Evaluating a prospective contractor's safety and health programs; and (3) Conducting post...
ERIC Educational Resources Information Center
Zhang, Xuesong; Dorn, Bradley
2012-01-01
Agile development has received increasing interest both in industry and academia due to its benefits in developing software quickly, meeting customer needs, and keeping pace with the rapidly changing requirements. However, agile practices and scrum in particular have been mainly tested in mid- to large-size projects. In this paper, we present…
Ion mobility spectrometry: A personal view of its development at UCSB
2014-09-15
molecules. As we progressed we realized that new, more accurate algorithms were needed to augment our early projection approximation (PA) for determining...required. The goal was to maintain some of the speed of the projection approximation and retain the accuracy of the trajectory method. Christian...Bleiholder, while a postdoc in my group, did just that by development of the projection superposition approximation (PSA) [31–35]. This new method is 100
Automated Ground Umbilical Systems (AGUS) Project
NASA Technical Reports Server (NTRS)
Gosselin, Armand M.
2007-01-01
All space vehicles require ground umbilical systems for servicing. Servicing requirements can include, but are not limited to, electrical power and control, propellant loading and venting, pneumatic system supply, hazard gas detection and purging as well as systems checkout capabilities. Of the various types of umbilicals, all require several common subsystems. These typically include an alignment system, mating and locking system, fluid connectors, electrical connectors and control !checkout systems. These systems have been designed to various levels of detail based on the needs for manual and/or automation requirements. The Automated Ground Umbilical Systems (AGUS) project is a multi-phase initiative to develop design performance requirements and concepts for launch system umbilicals. The automation aspect minimizes operational time and labor in ground umbilical processing while maintaining reliability. This current phase of the project reviews the design, development, testing and operations of ground umbilicals built for the Saturn, Shuttle, X-33 and Atlas V programs. Based on the design and operations lessons learned from these systems, umbilicals can be optimized for specific applications. The product of this study is a document containing details of existing systems and requirements for future automated umbilical systems with emphasis on design-for-operations (DFO).
The automated ground network system
NASA Technical Reports Server (NTRS)
Smith, Miles T.; Militch, Peter N.
1993-01-01
The primary goal of the Automated Ground Network System (AGNS) project is to reduce Ground Network (GN) station life-cycle costs. To accomplish this goal, the AGNS project will employ an object-oriented approach to develop a new infrastructure that will permit continuous application of new technologies and methodologies to the Ground Network's class of problems. The AGNS project is a Total Quality (TQ) project. Through use of an open collaborative development environment, developers and users will have equal input into the end-to-end design and development process. This will permit direct user input and feedback and will enable rapid prototyping for requirements clarification. This paper describes the AGNS objectives, operations concept, and proposed design.
Targeting Learning Needs in an Australian Aid Project in Thailand.
ERIC Educational Resources Information Center
Kinder, Rex; Karawanan, Chaisak
1996-01-01
The Thailand Land Titling Project includes a training and development component aimed at long-term sustainability. A training target matrix was developed to identify the knowledge, skills, experience, and performance standards required and needs for training at various levels. Six broad and flexible career paths allow for logical succession,…
ERIC Educational Resources Information Center
Fabricatore, Carlo; López, Ximena
2013-01-01
The increasing demand for creative individuals in the labor market requires well-prepared professionals, capable of enhancing competitiveness through new ideas and innovative actions. Educational programs should, therefore, rely on approaches and learning environments that foster creativity. In this study, video game development projects were used…
2015-02-01
study developed a test plan to test BU16 in CG boats, assessing boat performance, and the modifications required to use the fuel. The third study (and...current project) executed this test plan to quantify implementation issues, benefits and impacts of using the alternative fuel in CG boats under...4 2.2 Project 2: Test Plan Development
The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barriermore » at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.« less
Galloway, M J
2004-04-01
This guideline reviews the introduction and development of business planning in the National Health Service. A guideline for writing a business case for service development that would form part of a pathology business plan has been developed. This guideline outlines six steps that are required in the preparation of a business case. The format of the guideline has been developed largely from other national guidelines that have been published for the development of capital projects. In view of the publication of these guidelines, the scope of this guideline excludes business cases for information, management, and technology projects and large capital projects.
LDRD 2014 Annual Report: Laboratory Directed Research and Development Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hatton, Diane
Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy (DOE) in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2014, as required. In FY 2014, the BNL LDRD Program funded 40 projects, 8 of which were new starts, at a total cost of $9.6M.
LDRD 2012 Annual Report: Laboratory Directed Research and Development Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bookless, William
Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY2012, as required. In FY2012, the BNL LDRD Program funded 52 projects, 14 of which were new starts, at a total cost of $10,061,292.
Agricultural aviation user requirement priorities
NASA Technical Reports Server (NTRS)
Kaplan, R. L.; Meeland, T.; Peterson, J. E.
1977-01-01
The results are given of a research project pertaining to the development of agricultural aviation user requirement priorities. The raw data utilized in the project was obtained from the National Agricultural Aviation Association. A specially configured poll, developed by the Actuarial Research Corporation was used to solicit responses from NAAA members and others. The primary product of the poll is the specification of seriousness as determined by the respondents for some selected agricultural aviation problem areas identified and defined during the course of an intensive analysis by the Actuarial Research Corporation.
LDRD 2015 Annual Report: Laboratory Directed Research and Development Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hatton, D.
Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy (DOE) in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2015, as required. In FY 2015, the BNL LDRD Program funded 43 projects, 12 of which were new starts, at a total cost of $9.5M.
Development of a Thin-Wall Magnesium side door Inner Panel for Automobiles
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jekl, J.; Auld, J.; Sweet, C.
Cast magnesium side door inner panels can provide a good combination of weight, functional, manufacturing and economical requirements. However, several challenges exist including casting technology for thin-wall part design, multi-material incompatibility and relatively low strength vs steel. A project has been initiated, supported by the US Department of Energy, to design and develop a lightweight frame-under-glass door having a thin-wall, full die-cast, magnesium inner panel. This development project is the first of its kind within North America. Phase I of the project is now complete and the 2.0mm magnesium design, through casting process enablers, has met or exceeded all stiffnessmore » requirements, with significant mass reduction and part consolidation. In addition, a corrosion mitigation strategy has been established using industry-accepted galvanic isolation methods and coating technologies.« less
P.L. Tedder; R.N. La Mont; J.C. Kincaid
1987-01-01
TRIM (Timber Resource Inventory Model) is a yield table projection system developed for timber supply projections and policy analysis. TRIM simulates timber growth, inventories, management and area changes, and removals over the projection period. Programs in the TRIM system, card-by-card descriptions of required inputs, table formats, and sample results are presented...
Funding Solar Projects at Federal Agencies: Mechanisms and Selection Criteria (Brochure)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Implementing solar energy projects at federal facilities is a process. The project planning phase of the process includes determining goals, building a team, determining site feasibility and selecting the appropriate project funding tool. This fact sheet gives practical guidance to assist decision-makers with understanding and selecting the funding tool that would best address their site goals. Because project funding tools are complex, federal agencies should seek project assistance before making final decisions. High capital requirements combined with limits on federal agency energy contracts create challenges for funding solar projects. Solar developers typically require long-term contracts (15-20) years to spread outmore » the initial investment and to enable payments similar to conventional utility bill payments. In the private sector, 20-year contracts have been developed, vetted, and accepted, but the General Services Administration (GSA) contract authority (federal acquisition regulation [FAR] part 41) typically limits contract terms to 10 years. Payments on shorter-term contracts make solar economically unattractive compared with conventional generation. However, in several instances, the federal sector has utilized innovative funding tools that allow long-term contracts or has created a project package that is economically attractive within a shorter contract term.« less
Risk assessment for construction projects of transport infrastructure objects
NASA Astrophysics Data System (ADS)
Titarenko, Boris
2017-10-01
The paper analyzes and compares different methods of risk assessment for construction projects of transport objects. The management of such type of projects demands application of special probabilistic methods due to large level of uncertainty of their implementation. Risk management in the projects requires the use of probabilistic and statistical methods. The aim of the work is to develop a methodology for using traditional methods in combination with robust methods that allow obtaining reliable risk assessments in projects. The robust approach is based on the principle of maximum likelihood and in assessing the risk allows the researcher to obtain reliable results in situations of great uncertainty. The application of robust procedures allows to carry out a quantitative assessment of the main risk indicators of projects when solving the tasks of managing innovation-investment projects. Calculation of damage from the onset of a risky event is possible by any competent specialist. And an assessment of the probability of occurrence of a risky event requires the involvement of special probabilistic methods based on the proposed robust approaches. Practice shows the effectiveness and reliability of results. The methodology developed in the article can be used to create information technologies and their application in automated control systems for complex projects.
In-space propellant logistics. Volume 4: Project planning data
NASA Technical Reports Server (NTRS)
1972-01-01
The prephase A conceptual project planning data as it pertains to the development of the selected logistics module configuration transported into earth orbit by the space shuttle orbiter. The data represents the test, implementation, and supporting research and technology requirements for attaining the propellant transfer operational capability for early 1985. The plan is based on a propellant module designed to support the space-based tug with cryogenic oxygen-hydrogen propellants. A logical sequence of activities that is required to define, design, develop, fabricate, test, launch, and flight test the propellant logistics module is described. Included are the facility and ground support equipment requirements. The schedule of activities are based on the evolution and relationship between the R and T, the development issues, and the resultant test program.
NASA Astrophysics Data System (ADS)
Quartel, Dick; Steen, Maarten W. A.; Lankhorst, Marc M.
2012-05-01
This article describes an architecture-based approach to IT valuation. This approach offers organisations an instrument to valuate their application and project portfolios and to make well-balanced decisions about IT investments. The value of a software application is assessed in terms of its contribution to a selection of business goals. Based on such assessments, the value of different applications can be compared, and requirements for innovation, development, maintenance and phasing out can be identified. IT projects are proposed to realise the requirements. The value of each project is assessed in terms of the value it adds to one or more applications. This value can be obtained by relating the 'as-is' application portfolio to the 'to-be' portfolio that is being proposed by the project portfolio. In this way, projects can be ranked according to their added value, given a certain selection of business goals. The approach uses ArchiMate to model the relationship between software applications, business processes, services and products. In addition, two language extensions are used to model the relationship of these elements to business goals and requirements and to projects and project portfolios. The approach is illustrated using the portfolio method of Bedell and has been implemented in BiZZdesign Architect.
24 CFR 1006.375 - Other Federal requirements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... acquisition policies are applicable to programs developed or operated under the Act and this part: (1) Real... URBAN DEVELOPMENT NATIVE HAWAIIAN HOUSING BLOCK GRANT PROGRAM Program Requirements § 1006.375 Other... Definitions for All Programs”; (3) Subpart H, “Project-Based Rental Assistance”; (4) Subpart J...
24 CFR 1006.375 - Other Federal requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... acquisition policies are applicable to programs developed or operated under the Act and this part: (1) Real... URBAN DEVELOPMENT NATIVE HAWAIIAN HOUSING BLOCK GRANT PROGRAM Program Requirements § 1006.375 Other... Definitions for All Programs”; (3) Subpart H, “Project-Based Rental Assistance”; (4) Subpart J...
7 CFR 4290.620 - Requirements to obtain information from Portfolio Concerns.
Code of Federal Regulations, 2011 CFR
2011-01-01
... the Enterprise to submit such financial statements, plans of operation (including intended use of financing proceeds), cash flow analyses, projections, and such economic development information about the... financial and economic development information. (1) The terms of each Financing must require the Portfolio...
Hydrogen use projections and supply options
NASA Technical Reports Server (NTRS)
Manvi, R.; Fujita, T.
1976-01-01
Reference and expanded use projections were developed to estimate future hydrogen demand. The rationale in the development of these projections, which estimate the growth of hydrogen usage of approximately 1 X 10 to the fifteenth power Btu in 1973 to approximately 5.5 X 10 to the fifteenth power for reference use and 22 X 10 to the fifteenth power Btu for expanded use projections in year 2000. Primary energy sources required to produce these demands are discussed in the light of transition from a low merchant to high merchant supply option.
Adapting Project Management Practices to Research-Based Projects
NASA Technical Reports Server (NTRS)
Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.
2007-01-01
From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.
Health impact assessment of industrial development projects: a spatio-temporal visualization.
Winkler, Mirko S; Krieger, Gary R; Divall, Mark J; Singer, Burton H; Utzinger, Jürg
2012-05-01
Development and implementation of large-scale industrial projects in complex eco-epidemiological settings typically require combined environmental, social and health impact assessments. We present a generic, spatio-temporal health impact assessment (HIA) visualization, which can be readily adapted to specific projects and key stakeholders, including poorly literate communities that might be affected by consequences of a project. We illustrate how the occurrence of a variety of complex events can be utilized for stakeholder communication, awareness creation, interactive learning as well as formulating HIA research and implementation questions. Methodological features are highlighted in the context of an iron ore development in a rural part of Africa.
Investigating the Nature of Dark Energy using Type Ia Supernovae with WFIRST-AFTA Space Mission
NASA Astrophysics Data System (ADS)
Perlmutter, Saul
Scientifically, the WFIRST supernova program is unique: it makes possible a dark energy measurement that no other space mission or ground-based project is addressing, a measurement that will set the standard in determining the expansion history of the universe continuously from low to high redshifts (0.1 < z < 1.7). In the context of the WFIRST Science Definition Team several participants in this proposal have developed a first version of a supernova program, described in the WFIRST SDT Report. While this program was judged to be a robust one, and the estimates of the sensitivity to the cosmological parameters were felt to be reliable, due to limitations of time the analysis was clearly limited in depth on a number of issues. The objective of this proposal is to further develop this program. Technically this is the WFIRST measurement that arguably requires the most advanced project development, since it requires near-real-time analysis and follow-up with WFIRST, and since it is using the IFU spectrograph in the WFI package, the IFU being the WFIRST instrument that does not yet have a completely consistent set of specifications in the design iteration of the SDT report. In this proposal for the WFIRST Scientific Investigation Team, focused primarily on the supernova dark energy measurements, we address these crucial technical needs by bringing the larger supernova community's expertise on the science elements together with a smaller focused team that can produce the specific deliverables. Thus the objectives of this 5 year proposal are the following: 1. Development of scientific performance requirements for the study of Dark Energy using Type Ia supernovae 2. Design an observing strategy using the Wide Field Instrument (WFI) and the Integral Field Spectrometer Unit (IFU) 3. Development of science data analysis techniques and data analysis software 4. Development of ground and space calibration requirements and estimating realistic correlated errors, both statistical and systematic 5. Development of simulations and data challenges to validate the above 6. Development of complete plans in coordination with WFIRST project, for all aspects of science simulations, precursor observations, ground calibration, observational needs, data processing, anciliary data collection/incorporation, analysis, dissemination and documentation of the proposed science investigation. The 5 year program also intends to provide the following deliverables: 1. Documentation describing detailed scientific performance requirements 2. Documentation describing a design of an observing program 3. Documentation of science data analysis techniques 4. Simulations and data challenges to validate the above items 5. Algorithms used to perform processing of science data to serve as a basis for the WFIRST pipeline To achieve these objectives the plan is to set up a Supernova Project Office, seven Supernova Working Groups, and two Supernova Software Deliverables Teams. During the recent years of work with the Science Definition Team, it has been clear that the WFIRST Project Office requires a continuous series of scientific answers to the stream of design and requirements questions that arise in the development of the mission. One of the highest priorities of the Supernova Project Office will be to coordinate with the WFIRST Project Office and be the one-stop-shopping source of answers to such questions. The second topic of this proposal is Weak Lensing (WL). The intrinsic broad wavelength coverage and excellent flux calibration of the IFU spectra will provide an important training for the photometric redshift measurements, beyond what is possible from the ground, required for the WL survey. At this time the IFU design details are not fully developed, and our studies will ensure that the WL photo-z requirements are folded into a realistic final IFU design.
Project management techniques for highly integrated programs
NASA Technical Reports Server (NTRS)
Stewart, J. F.; Bauer, C. A.
1983-01-01
The management and control of a representative, highly integrated high-technology project, in the X-29A aircraft flight test project is addressed. The X-29A research aircraft required the development and integration of eight distinct technologies in one aircraft. The project management system developed for the X-29A flight test program focuses on the dynamic interactions and the the intercommunication among components of the system. The insights gained from the new conceptual framework permitted subordination of departments to more functional units of decisionmaking, information processing, and communication networks. These processes were used to develop a project management system for the X-29A around the information flows that minimized the effects inherent in sampled-data systems and exploited the closed-loop multivariable nature of highly integrated projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1983-12-30
The purpose of this study and report is to develop a systematic program of energy consumption reductions in compliance with the stated goals of the Army Facilities Energy Plan (AFEP). This report will: Develop a systematic plan of energy conservation opportunities (ECO`s) that will meet the objectives of the AFEP. Develop a coordinated facility-wide energy study. Prepare DD Form 1391 and Project Development Brochure (PDB`s) and required documentation for feasible projects. Include all practical energy conservation methods and determine economic feasibility in accordance with given guidelines. List and prioritize recommended projects.
The Army Study Program Fiscal Year 1993 Report
1992-11-16
results of the PERFORMER: CAA Ardennes campaign and, if necessary, to recommend modifications to CEM. PROJECT TITLE: Economic Analysis Of HODA Automation...DCSOPS PERFORMER: CAA PROJECT TITLE: Wartime Requirements, FY 99 PUIC: CSCAMNO15 To assist HODA in determining conventional munition requirements...STUDY WILL ATTEMPT TO DEVELOP A MULTIPLE CRITERIA OPTIMIZATION MODEL DTIC NUMBER: TO AID IN THE PROGRAMMING OF ARMY ACQUISITION FUNDS AT HODA . THE
DOE Office of Scientific and Technical Information (OSTI.GOV)
Steich, D J; Brugger, S T; Kallman, J S
2000-02-01
This final report describes our efforts on the Three-Dimensional Massively Parallel CEM Technologies LDRD project (97-ERD-009). Significant need exists for more advanced time domain computational electromagnetics modeling. Bookkeeping details and modifying inflexible software constitute a vast majority of the effort required to address such needs. The required effort escalates rapidly as problem complexity increases. For example, hybrid meshes requiring hybrid numerics on massively parallel platforms (MPPs). This project attempts to alleviate the above limitations by investigating flexible abstractions for these numerical algorithms on MPPs using object-oriented methods, providing a programming environment insulating physics from bookkeeping. The three major design iterationsmore » during the project, known as TIGER-I to TIGER-III, are discussed. Each version of TIGER is briefly discussed along with lessons learned during the development and implementation. An Application Programming Interface (API) of the object-oriented interface for Tiger-III is included in three appendices. The three appendices contain the Utilities, Entity-Attribute, and Mesh libraries developed during the project. The API libraries represent a snapshot of our latest attempt at insulated the physics from the bookkeeping.« less
GCS plan for software aspects of certification
NASA Technical Reports Server (NTRS)
Shagnea, Anita M.; Lowman, Douglas S.; Withers, B. Edward
1990-01-01
As part of the Guidance and Control Software (GCS) research project being sponsored by NASA to evaluate the failure processes of software, standard industry software development procedures are being employed. To ensure that these procedures are authentic, the guidelines outlined in the Radio Technical Commission for Aeronautics (RTCA/DO-178A document entitled, software considerations in airborne systems and equipment certification, were adopted. A major aspect of these guidelines is proper documentation. As such, this report, the plan for software aspects of certification, was produced in accordance with DO-178A. An overview is given of the GCS research project, including the goals of the project, project organization, and project schedules. It also specifies the plans for all aspects of the project which relate to the certification of the GCS implementations developed under a NASA contract. These plans include decisions made regarding the software specification, accuracy requirements, configuration management, implementation development and verification, and the development of the GCS simulator.
Solar Concentrator Advanced Development Program
NASA Technical Reports Server (NTRS)
Knasel, Don; Ehresman, Derik
1989-01-01
The Solar Concentrator Advanced Development Project has successfully designed, fabricated, and tested a full scale prototypical solar dynamic concentrator for space station applications. A Truss Hexagonal Panel reflector was selected as a viable solar concentrator concept to be used for space station applications. This concentrator utilizes a modular design approach and is flexible in attainable flux profiles and assembly techniques. The detailed design of the concentrator, which included structural, thermal and optical analysis, identified the feasibility of the design and specific technologies that were required to fabricate it. The needed surface accuracy of the reflectors surface was found to be very tight, within 5 mrad RMS slope error, and results in very close tolerances for fabrication. To meet the design requirements, a modular structure composed of hexagonal panels was used. The panels, made up of graphite epoxy box beams provided the strength, stiffness and dimensional stability needed. All initial project requirements were met or exceeded by hardware demonstration. Initial testing of structural repeatability of a seven panel portion of the concentrator was followed by assembly and testing of the full nineteen panel structure. The testing, which consisted of theodolite and optical measurements over an assembly-disassembly-reassembly cycle, demonstrated that the concentrator maintained the as-built contour and optical characteristics. The facet development effort within the project, which included developing the vapor deposited reflective facet, produced a viable design with demonstrated optical characteristics that are within the project goals.
Evaluation of a proposed expert system development methodology: Two case studies
NASA Technical Reports Server (NTRS)
Gilstrap, Lewey
1990-01-01
Two expert system development projects were studied to evaluate a proposed Expert Systems Development Methodology (ESDM). The ESDM was developed to provide guidance to managers and technical personnel and serve as a standard in the development of expert systems. It was agreed that the proposed ESDM must be evaluated before it could be adopted; therefore a study was planned for its evaluation. This detailed study is now underway. Before the study began, however, two ongoing projects were selected for a retrospective evaluation. They were the Ranging Equipment Diagnostic Expert System (REDEX) and the Backup Control Mode Analysis and Utility System (BCAUS). Both projects were approximately 1 year into development. Interviews of project personnel were conducted, and the resulting data was used to prepare the retrospective evaluation. Decision models of the two projects were constructed and used to evaluate the completeness and accuracy of key provisions of ESDM. A major conclusion reached from these case studies is that suitability and risk analysis should be required for all AI projects, large and small. Further, the objectives of each stage of development during a project should be selected to reduce the next largest area of risk or uncertainty on the project.
Impact of System Expansion on Maintenance Resources.
DOT National Transportation Integrated Search
2012-09-01
The basic focus of this research project is developing a marginal maintenance cost mechanism for new construction projects. This mechanism will identify the total expected short-term and long-term maintenance burden required for each construction pro...
Developing a performance measurement approach to benefit/cost freight project prioritization.
DOT National Transportation Integrated Search
2014-10-01
Future reauthorizations of the federal transportation bill will require a comprehensive and quantitative analysis of the freight benefits : of proposed freight system projects. To prioritize public investments in freight systems and to insure conside...
Development of Inflatable Entry Systems Technologies
NASA Technical Reports Server (NTRS)
Player, Charles J.; Cheatwood, F. McNeil; Corliss, James
2005-01-01
Achieving the objectives of NASA s Vision for Space Exploration will require the development of new technologies, which will in turn require higher fidelity modeling and analysis techniques, and innovative testing capabilities. Development of entry systems technologies can be especially difficult due to the lack of facilities and resources available to test these new technologies in mission relevant environments. This paper discusses the technology development process to bring inflatable aeroshell technology from Technology Readiness Level 2 (TRL-2) to TRL-7. This paper focuses mainly on two projects: Inflatable Reentry Vehicle Experiment (IRVE), and Inflatable Aeroshell and Thermal Protection System Development (IATD). The objectives of IRVE are to conduct an inflatable aeroshell flight test that demonstrates exoatmospheric deployment and inflation, reentry survivability and stability, and predictable drag performance. IATD will continue the development of the technology by conducting exploration specific trade studies and feeding forward those results into three more flight tests. Through an examination of these projects, and other potential projects, this paper discusses some of the risks, issues, and unexpected benefits associated with the development of inflatable entry systems technology.
Oak Ridge Spallation Neutron Source (ORSNS) target station design integration
DOE Office of Scientific and Technical Information (OSTI.GOV)
McManamy, T.; Booth, R.; Cleaves, J.
1996-06-01
The conceptual design for a 1- to 3-MW short pulse spallation source with a liquid mercury target has been started recently. The design tools and methods being developed to define requirements, integrate the work, and provide early cost guidance will be presented with a summary of the current target station design status. The initial design point was selected with performance and cost estimate projections by a systems code. This code was developed recently using cost estimates from the Brookhaven Pulsed Spallation Neutron Source study and experience from the Advanced Neutron Source Project`s conceptual design. It will be updated and improvedmore » as the design develops. Performance was characterized by a simplified figure of merit based on a ratio of neutron production to costs. A work breakdown structure was developed, with simplified systems diagrams used to define interfaces and system responsibilities. A risk assessment method was used to identify potential problems, to identify required research and development (R&D), and to aid contingency development. Preliminary 3-D models of the target station are being used to develop remote maintenance concepts and to estimate costs.« less
US effort on HTS power transformers
NASA Astrophysics Data System (ADS)
Mehta, S.
2011-11-01
Waukesha Electric Systems has been working in HTS power transformers development program under the auspices of US Government Department of Energy since 1994. This presentation will describe various milestones for this program and program history along with the lessons learned along the way. Our motivations for working on this development program based on man benefits offered by HTS power transformers to power delivery systems will be discussed. Based on various issues encountered during execution of many HTS projects, DOE has set up an independent program review process that is lead by team of experts. This team reviews are integral part of all DOE HTS projects. Success of all projects would be greatly enhanced by identifying critical issues early in the program. Requiring appropriate actions to mitigate the issues before processing further will lead to proactive interrogation and incorporation of expert's ideas in the project plans. Working of this review process will be also described in this presentation. Waukesha Electric Systems team including: Superpower-Inc, Oak Ridge National Laboratory, University of Houston Center for Superconductivity and Southern California Edison company was awarded a cost share grant by US Government in 2010 for development of a fault current limiting HTS power transformer. This multi year's program will require design, manufacture, installation, and monitoring of a 28 MVA tree phase transformer installed at Irvine CA. Smart Grid demonstration site. Transformer specifications along with requirements for fault current limiting and site requirement will be discussed. Design and development of various sub systems in support of this program including: HTS conductor performance specification, Dielectric system design approach, Dewar development for containing phase assemblies, cryo-cooling system design approach, etc. will be described. Finally; overall program schedule, critical milestone events, test plans and progress to date will be reported.
Computer-aided software development process design
NASA Technical Reports Server (NTRS)
Lin, Chi Y.; Levary, Reuven R.
1989-01-01
The authors describe an intelligent tool designed to aid managers of software development projects in planning, managing, and controlling the development process of medium- to large-scale software projects. Its purpose is to reduce uncertainties in the budget, personnel, and schedule planning of software development projects. It is based on dynamic model for the software development and maintenance life-cycle process. This dynamic process is composed of a number of time-varying, interacting developmental phases, each characterized by its intended functions and requirements. System dynamics is used as a modeling methodology. The resulting Software LIfe-Cycle Simulator (SLICS) and the hybrid expert simulation system of which it is a subsystem are described.
Applying Project Management Strategies in a Large Curriculum Conversion Project in Higher Education
ERIC Educational Resources Information Center
Gardner, Joel; Bennett, Patrick A.; Hyatt, Niccole; Stoker, Kevin
2017-01-01
Higher education is undergoing great changes that require universities to adapt quickly, and making these changes can be difficult. One discipline that can aid in executing change is project management, which has developed a set of clear processes and strategies for completing initiatives quickly and effectively. Several authors have identified…
Avionics Technology Contract Project Report Phase I with Research Findings.
ERIC Educational Resources Information Center
Sappe', Hoyt; Squires, Shiela S.
This document reports on Phase I of a project that examined the occupation of avionics technician, established appropriate committees, and conducted task verification. Results of this phase provide the basic information required to develop the program standards and to guide and set up the committee structure to guide the project. Section 1…
24 CFR 5.327 - Nuisance or threat to health or safety.
Code of Federal Regulations, 2010 CFR
2010-04-01
... and Urban Development GENERAL HUD PROGRAM REQUIREMENTS; WAIVERS Pet Ownership for the Elderly or... removal of any pet from a project, if the pet's conduct or condition is duly determined to constitute... occupants of the project or of other persons in the community where the project is located. Pet Ownership...
24 CFR 5.327 - Nuisance or threat to health or safety.
Code of Federal Regulations, 2013 CFR
2013-04-01
... and Urban Development GENERAL HUD PROGRAM REQUIREMENTS; WAIVERS Pet Ownership for the Elderly or... removal of any pet from a project, if the pet's conduct or condition is duly determined to constitute... occupants of the project or of other persons in the community where the project is located. Pet Ownership...
24 CFR 5.327 - Nuisance or threat to health or safety.
Code of Federal Regulations, 2011 CFR
2011-04-01
... and Urban Development GENERAL HUD PROGRAM REQUIREMENTS; WAIVERS Pet Ownership for the Elderly or... removal of any pet from a project, if the pet's conduct or condition is duly determined to constitute... occupants of the project or of other persons in the community where the project is located. Pet Ownership...
24 CFR 5.327 - Nuisance or threat to health or safety.
Code of Federal Regulations, 2012 CFR
2012-04-01
... and Urban Development GENERAL HUD PROGRAM REQUIREMENTS; WAIVERS Pet Ownership for the Elderly or... removal of any pet from a project, if the pet's conduct or condition is duly determined to constitute... occupants of the project or of other persons in the community where the project is located. Pet Ownership...
24 CFR 5.327 - Nuisance or threat to health or safety.
Code of Federal Regulations, 2014 CFR
2014-04-01
... and Urban Development GENERAL HUD PROGRAM REQUIREMENTS; WAIVERS Pet Ownership for the Elderly or... removal of any pet from a project, if the pet's conduct or condition is duly determined to constitute... occupants of the project or of other persons in the community where the project is located. Pet Ownership...
All projects planned and implemented under the EPA Dioxin Exposure Initiative (DEI) are required to have completed Quality Assurance Project Plans (QAPPs) EPA Order 5360.1 A2 states, All work funded by the United States Environmental Protection Agency (EPA) that involves the ...
Critical Literacy for School Improvement: An Action Research Project
ERIC Educational Resources Information Center
Cooper, Karyn; White, Robert E.
2008-01-01
This article provides an overview of the integrative process of initiating an action research project on literacy for students "at risk" in a Canadian urban elementary school. As the article demonstrates, this requires development of a school-wide framework, which informs the action research project and desired outcomes, and a shared…
14 CFR 151.47 - Performance of construction work: Letting of contracts.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...
14 CFR 151.47 - Performance of construction work: Letting of contracts.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...
14 CFR 151.47 - Performance of construction work: Letting of contracts.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...
14 CFR 151.47 - Performance of construction work: Letting of contracts.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...
Eliciting User Requirements Using Appreciative Inquiry
ERIC Educational Resources Information Center
Gonzales, Carol Kernitzki
2010-01-01
Many software development projects fail because they do not meet the needs of users, are over-budget, and abandoned. To address this problem, the user requirements elicitation process was modified based on principles of Appreciative Inquiry. Appreciative Inquiry, commonly used in organizational development, aims to build organizations, processes,…
Murdoch-Eaton, Deborah; Drewery, Sarah; Elton, Sarah; Emmerson, Catherine; Marshall, Michelle; Smith, John A; Stark, Patsy; Whittle, Sue
2010-01-01
Undergraduate research exposure leads to increased recruitment into academic medicine, enhanced employability and improved postgraduate research productivity. Uptake of undergraduate research opportunities is reported to be disappointing, and little is known about how students perceive research. To investigate opportunities for undergraduate participation in research, recognition of such opportunities, and associated skills development. A mixed method approach, incorporating student focus and study groups, and documentary analysis at five UK medical schools. Undergraduates recognised the benefits of acquiring research skills, but identified practical difficulties and disadvantages of participating. Analysis of 905 projects in four main research skill areas - (1) research methods; (2) information gathering; (3) critical analysis and review; (4) data processing - indicated 52% of projects provided opportunities for students to develop one or more skills, only 13% offered development in all areas. In 17%, project descriptions provided insufficient information to determine opportunities. Supplied with information from a representative sample of projects (n = 80), there was little consensus in identifying skills among students or between students and researchers. Consensus improved dramatically following guidance on how to identify skills. Undergraduates recognise the benefits of research experience but need a realistic understanding of the research process. Opportunities for research skill development may not be obvious. Undergraduates require training to recognise the skills required for research and enhanced transparency in potential project outcomes.
Continuous Risk Management at NASA
NASA Technical Reports Server (NTRS)
Hammer, Theodore F.; Rosenberg, Linda
1999-01-01
NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions. This risk management structure of functions has been taught to projects at all NASA Centers and is being successfully implemented on many projects. This presentation will give project managers the information they need to understand if risk management is to be effectively implemented on their projects at a cost they can afford.
Thin Film Transistor Control Circuitry for MEMS Acoustic Transducers
NASA Astrophysics Data System (ADS)
Daugherty, Robin
This work seeks to develop a practical solution for short range ultrasonic communications and produce an integrated array of acoustic transmitters on a flexible substrate. This is done using flexible thin film transistor (TFT) and micro electromechanical systems (MEMS). The goal is to develop a flexible system capable of communicating in the ultrasonic frequency range at a distance of 10-100 meters. This requires a great deal of innovation on the part of the FDC team developing the TFT driving circuitry and the MEMS team adapting the technology for fabrication on a flexible substrate. The technologies required for this research are independently developed. The TFT development is driven primarily by research into flexible displays. The MEMS development is driving by research in biosensors and micro actuators. This project involves the integration of TFT flexible circuit capabilities with MEMS micro actuators in the novel area of flexible acoustic transmitter arrays. This thesis focuses on the design, testing and analysis of the circuit components required for this project.
NASA Technical Reports Server (NTRS)
Kapoor, Manju M.; Mehta, Manju
2010-01-01
The goal of this paper is to emphasize the importance of developing complete and unambiguous requirements early in the project cycle (prior to Preliminary Design Phase). Having a complete set of requirements early in the project cycle allows sufficient time to generate a traceability matrix. Requirements traceability and analysis are the key elements in improving verification and validation process, and thus overall software quality. Traceability can be most beneficial when the system changes. If changes are made to high-level requirements it implies that low-level requirements need to be modified. Traceability ensures that requirements are appropriately and efficiently verified at various levels whereas analysis ensures that a rightly interpreted set of requirements is produced.
Summary of the DOD Process for Developing Ouantitative Munitions Requirements
2000-02-24
extracted from the overall classified Secret documents, by itself, is unclassified. 20 conflict in the NonNuclear Consumables Annual Analysis threat...Projected Kits’ Projecled Consumption’ Projected Kfc ’ Projected Consumption4 Total Projected Consumption e.g. Tanks MTWEist Portion to defeat I1 MTW...umns2and5. er ol projected ’ The total munitions consumed lo achieve Ihe numb (ifebyrmivtiontype. Figure 3-1 Combat Munitions Data Formal ?? MUNITIONS
Controlled ecological life support system breadboard project, 1988
NASA Technical Reports Server (NTRS)
Knott, W. M.
1990-01-01
The Closed Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989 to 1993 are listed. The Biomass Production Chamber (BPC) became operational and tests of wheat as a single crop are nearing completion.
NASA Technical Reports Server (NTRS)
1971-01-01
The design plan requirements define the design implementation and control requirements for Phase C/D of the Modular Space Station Project and specifically address the Initial Space Station phase of the Space Station Program (modular). It is based primarily on the specific objective of translating the requirements of the Space Station Program, Project, Interface, and Support Requirements and preliminary contract end x item specifications into detail design of the operational systems which comprise the initial space station. This document is designed to guide aerospace contractors in the planning and bidding for Phase C/D.
Teacher-Researchers in the "Zone of Proximal Development": Insights for Teacher Education.
ERIC Educational Resources Information Center
Torres, Myriam N.
This study is part of a larger project on teacher research and professional development in the Teacher Enhancement Program (TEP), a master's degree mid-career collaborative program for inservice teachers. Research was initially planned and implemented as a new course which required teachers to do a Systematic Inquiry Project (SIP) in their…
Today's Authoring Tools for Tomorrow's Semantic Web.
ERIC Educational Resources Information Center
Dingley, Andy; Shabajee, Paul
This paper reports on the development of a prototype authoring tool developed as part of on-going research around the needs of the ARKive project. The project holds text, rich-media and descriptions of factual statements about bio-diversity and conservation information. A key user community is that of school age children, requiring the mark-up of…
Project CAD as of July 1978: CAD support project, situation in July 1978
NASA Technical Reports Server (NTRS)
Boesch, L.; Lang-Lendorff, G.; Rothenberg, R.; Stelzer, V.
1979-01-01
The structure of Computer Aided Design (CAD) and the requirements for program developments in past and future are described. The actual standard and the future aims of CAD programs are presented. The developed programs in: (1) civil engineering; (2) mechanical engineering; (3) chemical engineering/shipbuilding; (4) electrical engineering; and (5) general programs are discussed.
"Curriculum Development for Home and Health Nursing," January 1995-1996. Final Report on Project.
ERIC Educational Resources Information Center
Nagel, Mary
In 1995, Southwestern College, in California, participated in a project to develop a home health course for registered nurses and students interested in working in home health settings. The course was intended to provide nurses and students with the knowledge and clinical skills required for home health care, improve collaboration among community…
Issues in NASA program and project management
NASA Technical Reports Server (NTRS)
Hoffman, Edward J. (Editor)
1994-01-01
This volume is the eighth in an ongoing series addressing current topics and lessons learned in NASA program and project management. Articles in this volume cover the following topics: (1) power sources for the Galileo and Ulysses Missions; (2) managing requirements; (3) program control of the Tropical Rainfall Measuring Mission; (4) project management method; (5) career development for project managers; and (6) resources for NASA managers.
Computer program (POWREQ) for power requirements of mass transit vehicles
DOT National Transportation Integrated Search
1977-08-01
This project was performed to develop a computer program suitable for use in systematic analyses requiring estimates of the energy requirements of mass transit vehicles as a function of driving schedules and vehicle size, shape, and gross weight. The...
NASA Technical Reports Server (NTRS)
Zhang, Zhong
1997-01-01
The development of large-scale, composite software in a geographically distributed environment is an evolutionary process. Often, in such evolving systems, striving for consistency is complicated by many factors, because development participants have various locations, skills, responsibilities, roles, opinions, languages, terminology and different degrees of abstraction they employ. This naturally leads to many partial specifications or viewpoints. These multiple views on the system being developed usually overlap. From another aspect, these multiple views give rise to the potential for inconsistency. Existing CASE tools do not efficiently manage inconsistencies in distributed development environment for a large-scale project. Based on the ViewPoints framework the WHERE (Web-Based Hypertext Environment for requirements Evolution) toolkit aims to tackle inconsistency management issues within geographically distributed software development projects. Consequently, WHERE project helps make more robust software and support software assurance process. The long term goal of WHERE tools aims to the inconsistency analysis and management in requirements specifications. A framework based on Graph Grammar theory and TCMJAVA toolkit is proposed to detect inconsistencies among viewpoints. This systematic approach uses three basic operations (UNION, DIFFERENCE, INTERSECTION) to study the static behaviors of graphic and tabular notations. From these operations, subgraphs Query, Selection, Merge, Replacement operations can be derived. This approach uses graph PRODUCTIONS (rewriting rules) to study the dynamic transformations of graphs. We discuss the feasibility of implementation these operations. Also, We present the process of porting original TCM (Toolkit for Conceptual Modeling) project from C++ to Java programming language in this thesis. A scenario based on NASA International Space Station Specification is discussed to show the applicability of our approach. Finally, conclusion and future work about inconsistency management issues in WHERE project will be summarized.
Medical Data Architecture Project Status
NASA Technical Reports Server (NTRS)
Krihak, M.; Middour, C.; Lindsey, A.; Marker, N.; Wolfe, S.; Winther, S.; Ronzano, K.; Bolles, D.; Toscano, W.; Shaw, T.
2017-01-01
The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically-relevant information to support medical operations during exploration missions. This gap identifies that the current International Space Station (ISS) medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable an increasingly autonomous crew than the current ISS paradigm. The MDA will develop capabilities that support automated data collection, and the necessary functionality and challenges in executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. To attain this goal, the first year of the MDA project focused on reducing technical risk, developing documentation and instituting iterative development processes that established the basis for the first version of MDA software (or Test Bed 1). Test Bed 1 is based on a nominal operations scenario authored by the ExMC Element Scientist. This narrative was decomposed into a Concept of Operations that formed the basis for Test Bed 1 requirements. These requirements were successfully vetted through the MDA Test Bed 1 System Requirements Review, which permitted the MDA project to begin software code development and component integration. This paper highlights the MDA objectives, development processes, and accomplishments, and identifies the fiscal year 2017 milestones and deliverables in the upcoming year.
Requirements for Xenon International
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hayes, James C.; Ely, James H.; Haas, Derek A.
2015-12-30
This document defines the requirements for the new Xenon International radioxenon system. The output of this project will be a Pacific Northwest National Laboratory (PNNL) developed prototype and a manufacturer-developed production prototype. The two prototypes are intended to be as close to matching as possible; this will be facilitated by overlapping development cycles and open communication between PNNL and the manufacturer.
Lessons learned on the Ground Test Accelerator control system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kozubal, A.J.; Weiss, R.E.
1994-09-01
When we initiated the control system design for the Ground Test Accelerator (GTA), we envisioned a system that would be flexible enough to handle the changing requirements of an experimental project. This control system would use a developers` toolkit to reduce the cost and time to develop applications for GTA, and through the use of open standards, the system would accommodate unforeseen requirements as they arose. Furthermore, we would attempt to demonstrate on GTA a level of automation far beyond that achieved by existing accelerator control systems. How well did we achieve these goals? What were the stumbling blocks tomore » deploying the control system, and what assumptions did we make about requirements that turned out to be incorrect? In this paper we look at the process of developing a control system that evolved into what is now the ``Experimental Physics and Industrial Control System`` (EPICS). Also, we assess the impact of this system on the GTA project, as well as the impact of GTA on EPICS. The lessons learned on GTA will be valuable for future projects.« less
First-of-A-Kind Control Room Modernization Project Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thomas, Kenneth David
This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results andmore » documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.« less
DORCA 2 computer program. Volume 3: Program listing
NASA Technical Reports Server (NTRS)
Carey, J. B.
1972-01-01
A program listing for the Dynamic Operational Requirements and Cost Analysis Program is presented. Detailed instructions for the computer programming involved in space mission planning and project requirements are developed.
Hitchhiker: Customer Accommodations and Requirements Specifications (CARS)
NASA Technical Reports Server (NTRS)
1992-01-01
In 1984, NASA Headquarters established projects at the Goddard Space Flight Center (GSFC) and the Marshall Space Flight Center (MSFC) to develop quick-reaction carrier systems for low-cost 'flight of opportunity' or secondary payloads on the Space Transportation System (STS). One of these projects is the Hitchhiker (HH) Program. GSFC has developed a family of carrier equipment known as the Shuttle Payload of Opportunity Carrier (SPOC) system for mounting small payloads such as HH to the side of the Orbiter payload bay. The side-mounted HHs are referred to as Hitchhiker-G (HH-G). MSFC developed a cross-bay 'bridge-type' carrier structure called the Hitchhiker-M (HH-M). In 1987, responsibility for the HH-M carrier was transferred to and is now managed by the HH Project Office at the GSFC. The HH-M carrier now uses the same interchangeable SPOC avionics unit and the same electrical interfaces and services developed for HH-G. National Aeronautics and Space Administration (NASA) has created this document to acquaint potential HH system customers with the facilities NASA provides and the requirements which customers must satisfy to use these facilities. This publication defines interface items required for integrating customer equipment with the HH carrier system. Those items such as mounting equipment and electrical inputs and outputs; configuration, environmental, command, telemetry, and operational constraints are described as well as weight, power, and communications. The purpose of this publication is to help the customer understand essential integration documentation requirements and to prepare a Customer Payload Requirements (CPR) document.
DOE Office of Scientific and Technical Information (OSTI.GOV)
R. Strykowsky, T. Brown, J. Chrzanowski, M. Cole, P. Heitzenroeder, G.H. Neilson, Donald Rej, and M. Viola
The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative fusion energy confinement device developed by the Princeton Plasma Physics Laboratory (PPPL) and Oak Ridge National Laboratory (ORNL) under contract from the US Department of Energy. The project was technically very challenging, primarily due to the complex component geometries and tight tolerances that were required. As the project matured these challenges manifested themselves in significant cost overruns through all phases of the project (i.e. design, R&D, fabrication and assembly). The project was subsequently cancelled by the DOE in 2008. Although the project was not completed,more » several major work packages, comprising about 65% of the total estimated cost (excluding management and contingency), were completed, providing a data base of actual costs that can be analyzed to understand cost drivers. Technical factors that drove costs included the complex geometry, tight tolerances, material requirements, and performance requirements. Management factors included imposed annual funding constraints that throttled project cash flow, staff availability, and inadequate R&D. Understanding how requirements and design decisions drove cost through this top-down forensic cost analysis could provide valuable insight into the configuration and design of future state-of-the art machines and other devices.« less
Influence of the economy crisis on project cost management
NASA Astrophysics Data System (ADS)
Simankina, Tatyana; Ćetković, Jasmina; Verstina, Natalia; Evseev, Evgeny
2017-10-01
Economy crisis significantly affects primarily the project cost management. The article considers the problems of project management in the field of housing under conditions of economy crisis. Project budgets are reduced, their mutual interference grows and framework of risks changes. Apparently, specific approaches are required to be developed to optimize the expenses and guarantee the project implementation within the approved budget. There is considered domestic and foreign experience in terms of project cost management with involvement of BIM technologies.
Felzien, Lisa K
2016-11-12
Engaging undergraduates in research is essential for teaching them to think like scientists, and it has become a desired component of classroom and laboratory instruction. Research projects that span an entire semester expose students to a variety of concepts and techniques and allow students to use experiments to learn scientific principles, understand why specific techniques are applicable, critically analyze varied data, and examine how experimentation leads to acquiring knowledge. To provide an experience with these features, a semester long research project was integrated into a combined lecture and laboratory course, Molecular Biology. The project utilized the zebrafish model to examine gene expression during embryonic development and required students to develop and test hypotheses about the timing of expression of previously uncharacterized genes. The main goals for the project were to provide opportunities for students to develop critical thinking skills required for conducting research and to support the content goals of the course. To determine whether these goals were met, student performance on the steps of the project and related pre-test and post-test questions was examined. © 2016 by The International Union of Biochemistry and Molecular Biology, 44(6):565-573, 2016. © 2016 The International Union of Biochemistry and Molecular Biology.
7 CFR 4280.161 - Direct Loan Process.
Code of Federal Regulations, 2011 CFR
2011-01-01
... RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Renewable Energy Systems and Energy... available for direct loans; (2) Applicant and project eligibility criteria; (3) Minimum and maximum loan...; (11) Construction planning and performing development; (12) Requirements after project construction...
24 CFR 234.17 - Mortgagor and mortgagee requirements for maintaining flood insurance coverage.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Mortgagor and mortgagee requirements for maintaining flood insurance coverage. 234.17 Section 234.17 Housing and Urban Development... maintaining flood insurance coverage. The maintenance of flood insurance coverage on the project by the...
A Technical Evaluation of the First Stage of the Mediterranean Regional Project.
ERIC Educational Resources Information Center
Hollister, Robinson
Objectives of this technical evaluation concerning the transfer of experience in the development of human resources were to develop educational plans based upon comprehensive estimates of manpower requirements and to evaluate the methods used in estimating manpower requirements for educational planning. The methodology involved estimates of the…
NASA Astrophysics Data System (ADS)
Barnes, Cris W.; Fernández, Juan; Hartsfield, Thomas; Sandberg, Richard; Sheffield, Richard; Tapia, John P.; Wang, Zhehui
2017-06-01
NNSA does not have a capability to understand and test the response of materials and conditions necessary to determine the linkages between microstructure of materials and performance in extreme weapons-relevant environments. Required is an x-ray source, coherent to optimize imaging capability, brilliant and high repetition-rate to address all relevant time scales, and with high enough energy to see into and through the amount of material in the middle or mesoscale where microstructure determines materials response. The Department of Energy has determined there is a mission need for a MaRIE Project to deliver this capability. There are risks to the Project to successfully deliver all the technology needed to provide the capability for the mission need and to use those photons to control the time-dependent production and performance of materials. The present technology risk mitigation activities for the MaRIE project are: developing ultrafast high-energy x-ray detectors, combining the data from several imaging probes to obtain multi-dimensional information about the sample, and developing techniques for bulk dynamic measurements of temperature. This talk will describe these efforts and other critical technology elements requiring future investment by the project.
Web-Based Predictive Analytics to Improve Patient Flow in the Emergency Department
NASA Technical Reports Server (NTRS)
Buckler, David L.
2012-01-01
The Emergency Department (ED) simulation project was established to demonstrate how requirements-driven analysis and process simulation can help improve the quality of patient care for the Veterans Health Administration's (VHA) Veterans Affairs Medical Centers (VAMC). This project developed a web-based simulation prototype of patient flow in EDs, validated the performance of the simulation against operational data, and documented IT requirements for the ED simulation.
Environmental impacts of dispersed development from federal infrastructure projects.
Southerland, Mark T
2004-06-01
Dispersed development, also referred to as urban growth or sprawl, is a pattern of low-density development spread over previously rural landscapes. Such growth can result in adverse impacts to air quality, water quality, human health, aquatic and terrestrial ecosystems, agricultural land, military training areas, water supply and wastewater treatment, recreational resources, viewscapes, and cultural resources. The U.S. Environmental Protection Agency (U.S. EPA) is charged with protecting public health and the environment, which includes consideration of impacts from dispersed development. Specifically, because federal infrastructure projects can affect the progress of dispersed development, the secondary impacts resulting from it must be assessed in documents prepared under the National Environmental Policy Act (NEPA). The Council on Environmental Quality (CEQ) has oversight for NEPA and Section 309 of the Clean Air Act requires that U.S. EPA review and comment on federal agency NEPA documents. The adverse effects of dispersed development can be induced by federal infrastructure projects including transportation, built infrastructure, modifications in natural infrastructure, public land conversion and redevelopment of properties, construction of federal facilities, and large traffic or major growth generation developments requiring federal permits. This paper presents an approach that U.S. EPA reviewers and NEPA practitioners can use to provide accurate, realistic, and consistent analysis of secondary impacts of dispersed development resulting from federal infrastructure projects. It also presents 24 measures that can be used to mitigate adverse impacts from dispersed development by modifying project location and design, participating in preservation or restoration activities, or informing and supporting local communities in planning.
NASA Supportability Engineering Implementation Utilizing DoD Practices and Processes
NASA Technical Reports Server (NTRS)
Smith, David A.; Smith, John V.
2010-01-01
The Ares I design and development program made the determination early in the System Design Review Phase to utilize DoD ILS and LSA approach for supportability engineering as an integral part of the system engineering process. This paper is to provide a review of the overall approach to design Ares-I with an emphasis on a more affordable, supportable, and sustainable launch vehicle. Discussions will include the requirements development, design influence, support concept alternatives, ILS and LSA planning, Logistics support analyses/trades performed, LSA tailoring for NASA Ares Program, support system infrastructure identification, ILS Design Review documentation, Working Group coordination, and overall ILS implementation. At the outset, the Ares I Project initiated the development of the Integrated Logistics Support Plan (ILSP) and a Logistics Support Analysis process to provide a path forward for the management of the Ares-I ILS program and supportability analysis activities. The ILSP provide the initial planning and coordination between the Ares-I Project Elements and Ground Operation Project. The LSA process provided a system engineering approach in the development of the Ares-I supportability requirements; influence the design for supportability and development of alternative support concepts that satisfies the program operability requirements. The LSA planning and analysis results are documented in the Logistics Support Analysis Report. This document was required during the Ares-I System Design Review (SDR) and Preliminary Design Review (PDR) review cycles. To help coordinate the LSA process across the Ares-I project and between programs, the LSA Report is updated and released quarterly. A System Requirement Analysis was performed to determine the supportability requirements and technical performance measurements (TPMs). Two working groups were established to provide support in the management and implement the Ares-I ILS program, the Integrated Logistics Support Working Group (ILSWG) and the Logistics Support Analysis Record Working Group (LSARWG). The Ares I ILSWG is established to assess the requirements and conduct, evaluate analyses and trade studies associated with acquisition logistic and supportability processes and to resolve Ares I integrated logistics and supportability issues. It established a strategic collaborative alliance for coordination of Logistics Support Analysis activates in support of the integrated Ares I vehicle design and development of logistics support infrastructure. A Joint Ares I - Orion LSAR Working Group was established to: 1) Guide the development of Ares-I and Orion LSAR data and serve as a model for future Constellation programs, 2) Develop rules and assumptions that will apply across the Constellation program with regards to the program's LSAR development, and 3) Maintain the Constellation LSAR Style Guide.
Cradle Enhanced UI Development
NASA Technical Reports Server (NTRS)
Jentsch, Samuel
2016-01-01
This summer I have been working in the EDI (Exploration, Development, and Integration) office. The primary goal of my office is to facilitate the integration, cooperation, and communication between programs, projects and departments throughout the agency. The majority of my efforts has been focused on Cradle, a requirements management and systems engineering tool. This tool is utilized by teams throughout NASA to plan and track the development of a variety of ongoing projects.
The Impact of NPG 7120.5A Upon Training and Development
NASA Technical Reports Server (NTRS)
Hoffman, Edward J.
1998-01-01
NASA Procedures and Guidance 7120.5A for Program and Project Management Processes and Requirements should have minimal effect upon current Agency training and development programs - mainly because the new directive simply formalizes what we have been teaching and learning in the NASA Program/Project Management Initiative all along. A frequent complaint we get from the 8,000 or so graduates of our PPMI courses over the years, however, deals with resistance to what they may have learned in the classroom or training site. Brimming with new ideas, these young men and women often run up against an entrenched program or project manager who insists that things be done "the old way," too often perceived as "the NASA way" or even "the Goddard way." Management was all too often in the eyes of the manager; now we're all reading from the same book, 7120.5A, Still, there is no single method or "one size fits all" approach to project management in NASA. While each Center is responsible for developing policies, processes and procedures to comply with the new NPG, individual program and project managers will still need to tailor their requirements to the specific needs of the project, consistent with the size, complexity, risk and criticality of the project. Under NPG 7120.5A, the results of such tailoring are to be documented in agreements among managers, directors, Enterprise Associate Administrators and the Administrator.
Onshore and Offshore Outsourcing with Agility: Lessons Learned
NASA Astrophysics Data System (ADS)
Kussmaul, Clifton
This chapter reflects on case study based an agile distributed project that ran for approximately three years (from spring 2003 to spring 2006). The project involved (a) a customer organization with key personnel distributed across the US, developing an application with rapidly changing requirements; (b) onshore consultants with expertise in project management, development processes, offshoring, and relevant technologies; and (c) an external offsite development team in a CMM-5 organization in southern India. This chapter is based on surveys and discussions with multiple participants. The several years since the project was completed allow greater perspective on both the strengths and weaknesses, since the participants can reflect on the entire life of the project, and compare it to subsequent experiences. Our findings emphasize the potential for agile project management in distributed software development, and the importance of people and interactions, taking many small steps to find and correct errors, and matching the structures of the project and product to support implementation of agility.
Rosenbluth, Glenn; Tabas, Jeffrey A; Baron, Robert B
2016-01-01
Residents are required to engage in quality improvement (QI) activities, which requires faculty engagement. Because of increasing program requirements and clinical demands, faculty may be resistant to taking on additional teaching and supervisory responsibilities without incentives. The authors sought to create an authentic benefit for University of California, San Francisco (UCSF) Pediatrics Residency Training Program faculty who supervise pediatrics residents' QI projects by offering maintenance of certification (MOC) Part 4 (Performance in Practice) credit. The authors identified MOC as an ideal framework to both more actively engage faculty who were supervising QI projects and provide incentives for doing so. To this end, in 2011, the authors designed an MOC portfolio program which included faculty development, active supervision of residents, and QI projects designed to improve patient care. The UCSF Pediatrics Residency Training Program's Portfolio Sponsor application was approved by the American Board of Pediatrics (ABP) in 2012, and faculty whose projects were included in the application were granted MOC Part 4 credit. As of December 2013, six faculty had received MOC Part 4 credit for their supervision of residents' QI projects. Based largely on the success of this program, UCSF has transitioned to the MOC portfolio program administered through the American Board of Medical Specialties, which allows the organization to offer MOC Part 4 credit from multiple specialty boards including the ABP. This may require refinements to screening, over sight, and reporting structures to ensure the MOC standards are met. Ongoing faculty development will be essential.
Advances in Grid Computing for the FabrIc for Frontier Experiments Project at Fermialb
DOE Office of Scientific and Technical Information (OSTI.GOV)
Herner, K.; Alba Hernandex, A. F.; Bhat, S.
The FabrIc for Frontier Experiments (FIFE) project is a major initiative within the Fermilab Scientic Computing Division charged with leading the computing model for Fermilab experiments. Work within the FIFE project creates close collaboration between experimenters and computing professionals to serve high-energy physics experiments of diering size, scope, and physics area. The FIFE project has worked to develop common tools for job submission, certicate management, software and reference data distribution through CVMFS repositories, robust data transfer, job monitoring, and databases for project tracking. Since the projects inception the experiments under the FIFE umbrella have signicantly matured, and present an increasinglymore » complex list of requirements to service providers. To meet these requirements, the FIFE project has been involved in transitioning the Fermilab General Purpose Grid cluster to support a partitionable slot model, expanding the resources available to experiments via the Open Science Grid, assisting with commissioning dedicated high-throughput computing resources for individual experiments, supporting the eorts of the HEP Cloud projects to provision a variety of back end resources, including public clouds and high performance computers, and developing rapid onboarding procedures for new experiments and collaborations. The larger demands also require enhanced job monitoring tools, which the project has developed using such tools as ElasticSearch and Grafana. in helping experiments manage their large-scale production work ows. This group in turn requires a structured service to facilitate smooth management of experiment requests, which FIFE provides in the form of the Production Operations Management Service (POMS). POMS is designed to track and manage requests from the FIFE experiments to run particular work ows, and support troubleshooting and triage in case of problems. Recently a new certicate management infrastructure called Distributed Computing Access with Federated Identities (DCAFI) has been put in place that has eliminated our dependence on a Fermilab-specic third-party Certicate Authority service and better accommodates FIFE collaborators without a Fermilab Kerberos account. DCAFI integrates the existing InCommon federated identity infrastructure, CILogon Basic CA, and a MyProxy service using a new general purpose open source tool. We will discuss the general FIFE onboarding strategy, progress in expanding FIFE experiments presence on the Open Science Grid, new tools for job monitoring, the POMS service, and the DCAFI project.« less
Advances in Grid Computing for the Fabric for Frontier Experiments Project at Fermilab
NASA Astrophysics Data System (ADS)
Herner, K.; Alba Hernandez, A. F.; Bhat, S.; Box, D.; Boyd, J.; Di Benedetto, V.; Ding, P.; Dykstra, D.; Fattoruso, M.; Garzoglio, G.; Kirby, M.; Kreymer, A.; Levshina, T.; Mazzacane, A.; Mengel, M.; Mhashilkar, P.; Podstavkov, V.; Retzke, K.; Sharma, N.; Teheran, J.
2017-10-01
The Fabric for Frontier Experiments (FIFE) project is a major initiative within the Fermilab Scientific Computing Division charged with leading the computing model for Fermilab experiments. Work within the FIFE project creates close collaboration between experimenters and computing professionals to serve high-energy physics experiments of differing size, scope, and physics area. The FIFE project has worked to develop common tools for job submission, certificate management, software and reference data distribution through CVMFS repositories, robust data transfer, job monitoring, and databases for project tracking. Since the projects inception the experiments under the FIFE umbrella have significantly matured, and present an increasingly complex list of requirements to service providers. To meet these requirements, the FIFE project has been involved in transitioning the Fermilab General Purpose Grid cluster to support a partitionable slot model, expanding the resources available to experiments via the Open Science Grid, assisting with commissioning dedicated high-throughput computing resources for individual experiments, supporting the efforts of the HEP Cloud projects to provision a variety of back end resources, including public clouds and high performance computers, and developing rapid onboarding procedures for new experiments and collaborations. The larger demands also require enhanced job monitoring tools, which the project has developed using such tools as ElasticSearch and Grafana. in helping experiments manage their large-scale production workflows. This group in turn requires a structured service to facilitate smooth management of experiment requests, which FIFE provides in the form of the Production Operations Management Service (POMS). POMS is designed to track and manage requests from the FIFE experiments to run particular workflows, and support troubleshooting and triage in case of problems. Recently a new certificate management infrastructure called Distributed Computing Access with Federated Identities (DCAFI) has been put in place that has eliminated our dependence on a Fermilab-specific third-party Certificate Authority service and better accommodates FIFE collaborators without a Fermilab Kerberos account. DCAFI integrates the existing InCommon federated identity infrastructure, CILogon Basic CA, and a MyProxy service using a new general purpose open source tool. We will discuss the general FIFE onboarding strategy, progress in expanding FIFE experiments presence on the Open Science Grid, new tools for job monitoring, the POMS service, and the DCAFI project.
NASA Astrophysics Data System (ADS)
Bijańska, Jolanta; Wodarski, Krzysztof; Wójcik, Janusz
2016-06-01
Efficient and effective preparation the production of new products is important requirement for a functioning and development of small and medium-sized enterprises. One of the methods, which support the fulfilment of this condition is project management. This publication presents the results of considerations, which are aimed at developing a project management model of preparation the production of a new product, adopted to specificity of small and medium-sized enterprises.
NASA Technical Reports Server (NTRS)
Hayati, Samad A.
2002-01-01
Future Mars missions require new capabilities that currently are not available. The Mars Technology Program (MTP) is an integral part of the Mars Exploration Program (MEP). Its sole purpose is to assure that required technologies are developed in time to enable the baselined and future missions. The MTP is a NASA-wide technology development program managed by JPL. It is divided into a Focused Program and a Base Program. The Focused Program is tightly tied to the proposed Mars Program mission milestones. It involves time-critical deliverables that must be developed in time for infusion into the proposed Mars 2005, and, 2009 missions. In addition a technology demonstration mission by AFRL will test a LIDAR as part of a joint NASNAFRL experiment. This program bridges the gap between technology and projects by vertically integrating the technology work with pre-project development in a project-like environment with critical dates for technology infusion. A Base Technology Program attacks higher riskhigher payoff technologies not in the critical path of missions.
Evaluation of ERDA-sponsored coal feed system development
NASA Technical Reports Server (NTRS)
Phen, R. L.; Luckow, W. K.; Mattson, L.; Otth, D.; Tsou, P.
1977-01-01
Coal feeders were evaluated based upon criteria such as technical feasibility, performance (i.e. ability to meet process requirements), projected life cycle costs, and projected development cost. An initial set of feeders was selected based on the feeders' cost savings potential compared with baseline lockhopper systems. Additional feeders were considered for selection based on: (1) increasing the probability of successful feeder development; (2) application to specific processes; and (3) technical merit. A coal feeder development program is outlined.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1987-03-01
An assessment of needs was completed, and a five-year project plan was developed with extensive input from private industry. Objective is to develop the industrial technology base required for reliable ceramics for application in advanced automotive heat engines. The project approach includes determining the mechanisms controlling reliability, improving processes for fabricating existing ceramics, developing new materials with increased reliability, and testing these materials in simulated engine environments to confirm reliability. Although this is a generic materials project, the focus is on structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments, and ceramic coatings for thermal barriermore » and wear applications in these engines.« less
Project development laboratories energy fuels and oils based on NRU “MPEI”
NASA Astrophysics Data System (ADS)
Burakov, I. A.; Burakov, A. Y.; Nikitina, I. S.; Khomenkov, A. M.; Paramonova, A. O.; Khtoo Naing, Aung
2017-11-01
In the process of improving the efficiency of power plants a hot topic is the use of high-quality fuels and lubricants. In the process of transportation, preparation for use, storage and maintenance of the properties of fuels and lubricants may deteriorate, which entails a reduction in the efficiency of power plants. One of the ways to prevent the deterioration of the properties is a timely analysis of the relevant laboratories. In this day, the existence of laboratories of energy fuels and energy laboratory oil at thermal power stations is satisfactory character. However, the training of qualified personnel to work in these laboratories is a serious problem, as the lack of opportunities in these laboratories a complete list of required tests. The solution to this problem is to explore the possibility of application of methods of analysis of the properties of fuels and lubricants in the stage of training and re-training of qualified personnel. In this regard, on the basis of MPEI developed laboratory projects of solid, liquid and gaseous fuels, power and energy oils and lubricants. Projects allow for a complete list of tests required for the timely control of properties and prevent the deterioration of these properties. Assess the financial component of the implementation of the developed projects based on the use of modern equipment used for tests. Projects allow for a complete list of tests required for the timely control of properties and prevent the deterioration of these properties.
NASA Technical Reports Server (NTRS)
Abney, Morgan; Barta, Daniel
2015-01-01
The Next Generation Life Support Spacecraft Oxygen Recovery (SCOR) project element is dedicated to developing technology that enables oxygen recovery from metabolically produced carbon dioxide in space habitats. The state-of-the-art system on the International Space Station uses Sabatier technology to recover (is) approximately 50% oxygen from carbon dioxide. The remaining oxygen required for crew respiration is supplied from Earth. For long duration manned missions beyond low-Earth orbit, resupply of oxygen becomes economically and logistically prohibitive. To mitigate these challenges, the SCOR project element is targeting development of technology to increase the recovery of oxygen to 75% or more, thereby reducing the total oxygen resupply required for future missions.
The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.
ERIC Educational Resources Information Center
Huber, Elaine
2017-01-01
Scholarly evaluation practices in learning and teaching projects are under-reported in the literature. In order for robust evaluative measures to be implemented, a project requires a well-designed evaluation plan. This research study describes the development of a practical evaluation planning framework through an action research approach, using…
ERIC Educational Resources Information Center
Okudan, Gul E.; Mohammed, Susan; Ogot, Madara
2006-01-01
This paper presents the preliminary work for developing guidelines to ensure that industry-sponsored projects in first-year courses aid, not hamper, retention of students. Specifically, the overall research plan includes the following steps: (1) investigating the appropriateness of industry projects in a required introduction to engineering design…
Chapter 8 - Mapping existing vegetation composition and structure for the LANDFIRE Prototype Project
Zhiliang Zhu; James Vogelmann; Donald Ohlen; Jay Kost; Xuexia Chen; Brian Tolk
2006-01-01
The Landscape Fire and Resource Management Planning Tools Prototype Project, or LANDFIRE Prototype Project, required the mapping of existing vegetation composition (cover type) and structural stages at a 30-m spatial resolution to provide baseline vegetation data for the development of wildland fuel maps and for comparison to simulated historical vegetation reference...
ERIC Educational Resources Information Center
Searight, H. Russell; Ratwik, Susan; Smith, Todd
2010-01-01
Many undergraduate programs require students to complete an independent research project in their major field prior to graduation. These projects are typically described as opportunities for integration of coursework and a direct application of the methods of inquiry specific to a particular discipline. Evaluations of curricular projects have…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shen, H.W.; Hiew, K.L.; Loubser, E.
1985-11-01
The Whooping Crane, an endangered species, uses the Platte River downstream from Overton, Nebraska in its migratory route. Maintenance of favorable habitat conditions required by law may mean restrictions on development and management of Colorado's entitled water in the South Platte River. The project investigated meeting crane habitat flow requirements by alternative plans for flow releases through Kingsley Dam (North Platte River) and Narrows Dam (a proposed project on the South Platte River). The analysis is based on mean monthly flow of the past 39 years. Irrigation releases were held firm, hydroelectric power production was maximized, and flows available tomore » meet habitat requirements were determined. A simulation model was developed to model the operation of the North Platte and South Platte Rivers.« less
Nonlinear models for estimating GSFC travel requirements
NASA Technical Reports Server (NTRS)
Buffalano, C.; Hagan, F. J.
1974-01-01
A methodology is presented for estimating travel requirements for a particular period of time. Travel models were generated using nonlinear regression analysis techniques on a data base of FY-72 and FY-73 information from 79 GSFC projects. Although the subject matter relates to GSFX activities, the type of analysis used and the manner of selecting the relevant variables would be of interest to other NASA centers, government agencies, private corporations and, in general, any organization with a significant travel budget. Models were developed for each of six types of activity: flight projects (in-house and out-of-house), experiments on non-GSFC projects, international projects, ART/SRT, data analysis, advanced studies, tracking and data, and indirects.
Development of cable drive systems for an automated assembly project
NASA Technical Reports Server (NTRS)
Monroe, Charles A., Jr.
1990-01-01
In a robotic assembly project, a method was needed to accurately position a robot and a structure which the robot was to assemble. The requirements for high precision and relatively long travel distances dictated the use of cable drive systems. The design of the mechanisms used in translating the robot and in rotating the assembly under construction is discussed. The design criteria are discussed, and the effect of particular requirements on the design is noted. Finally, the measured performance of the completed mechanism is compared with design requirements.
DOT National Transportation Integrated Search
2017-06-01
This project developed a methodology to simulate and analyze roadway traffic patterns : and expected penetration and timing of electric vehicles (EVs) with application directed : toward the requirements for electric vehicle supply equipment (EVSE) si...
Land Acquisition and Relocation Assistance for Airport Improvement Program (AIP) Assisted Projects
DOT National Transportation Integrated Search
2017-07-10
This advisory circular (AC) provides guidance to sponsors of airport projects developed under the Airport Improvement Program (AIP) to meet the requirements of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (Pl 9...
77 FR 29537 - Community Facility Loans
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
... alternate contracting method projects must comply with the requirements for ``maximum open and free... of alternate construction contract methods (such as Design/Build and Construction Management) by the.... Further, these changes will give all applicants greater flexibility in developing projects. Therefore, a...
Tethys: A Platform for Water Resources Modeling and Decision Support Apps
NASA Astrophysics Data System (ADS)
Swain, N. R.; Christensen, S. D.; Jones, N.; Nelson, E. J.
2014-12-01
Cloud-based applications or apps are a promising medium through which water resources models and data can be conveyed in a user-friendly environment—making them more accessible to decision-makers and stakeholders. In the context of this work, a water resources web app is a web application that exposes limited modeling functionality for a scenario exploration activity in a structured workflow (e.g.: land use change runoff analysis, snowmelt runoff prediction, and flood potential analysis). The technical expertise required to develop water resources web apps can be a barrier to many potential developers of water resources apps. One challenge that developers face is in providing spatial storage, analysis, and visualization for the spatial data that is inherent to water resources models. The software projects that provide this functionality are non-standard to web development and there are a large number of free and open source software (FOSS) projects to choose from. In addition, it is often required to synthesize several software projects to provide all of the needed functionality. Another challenge for the developer will be orchestrating the use of several software components. Consequently, the initial software development investment required to deploy an effective water resources cloud-based application can be substantial. The Tethys Platform has been developed to lower the technical barrier and minimize the initial development investment that prohibits many scientists and engineers from making use of the web app medium. Tethys synthesizes several software projects including PostGIS for spatial storage, 52°North WPS for spatial analysis, GeoServer for spatial publishing, Google Earth™, Google Maps™ and OpenLayers for spatial visualization, and Highcharts for plotting tabular data. The software selection came after a literature review of software projects being used to create existing earth sciences web apps. All of the software is linked via a Python-powered software development kit (SDK). Tethys developers use the SDK to build their apps and incorporate the needed functionality from the software suite. The presentation will include several apps that have been developed using Tethys to demonstrate its capabilities. Based upon work supported by the National Science Foundation under Grant No. 1135483.
History Places: A Case Study for Relational Database and Information Retrieval System Design
ERIC Educational Resources Information Center
Hendry, David G.
2007-01-01
This article presents a project-based case study that was developed for students with diverse backgrounds and varied inclinations for engaging technical topics. The project, called History Places, requires that student teams develop a vision for a kind of digital library, propose a conceptual model, and use the model to derive a logical model and…
ERIC Educational Resources Information Center
Castelino, Celine; Munn, Pamela
This project evaluated three modules, which were developed to meet key basic training requirements common to part-time workers in different branches of community education (adult education, community development, and youth work). Draft modules were sent to about 40 individuals or organizations in the field for comment on their structure and…
ERIC Educational Resources Information Center
Applied Management Sciences, Inc., Silver Spring, MD.
This report presents results of a project to assess the adequacy of existing data sources on the supply of 21 allied health occupations in order to develop improved data collection strategies and improved procedures for estimation of manpower needs. Following an introduction, chapter 2 provides a discussion of the general phases of the project and…
Space Human Factors Engineering Gap Analysis Project Final Report
NASA Technical Reports Server (NTRS)
Hudy, Cynthia; Woolford, Barbara
2006-01-01
Humans perform critical functions throughout each phase of every space mission, beginning with the mission concept and continuing to post-mission analysis (Life Sciences Division, 1996). Space missions present humans with many challenges - the microgravity environment, relative isolation, and inherent dangers of the mission all present unique issues. As mission duration and distance from Earth increases, in-flight crew autonomy will increase along with increased complexity. As efforts for exploring the moon and Mars advance, there is a need for space human factors research and technology development to play a significant role in both on-orbit human-system interaction, as well as the development of mission requirements and needs before and after the mission. As part of the Space Human Factors Engineering (SHFE) Project within the Human Research Program (HRP), a six-month Gap Analysis Project (GAP) was funded to identify any human factors research gaps or knowledge needs. The overall aim of the project was to review the current state of human factors topic areas and requirements to determine what data, processes, or tools are needed to aid in the planning and development of future exploration missions, and also to prioritize proposals for future research and technology development.
A study of mass data storage technology for rocket engine data
NASA Technical Reports Server (NTRS)
Ready, John F.; Benser, Earl T.; Fritz, Bernard S.; Nelson, Scott A.; Stauffer, Donald R.; Volna, William M.
1990-01-01
The results of a nine month study program on mass data storage technology for rocket engine (especially the Space Shuttle Main Engine) health monitoring and control are summarized. The program had the objective of recommending a candidate mass data storage technology development for rocket engine health monitoring and control and of formulating a project plan and specification for that technology development. The work was divided into three major technical tasks: (1) development of requirements; (2) survey of mass data storage technologies; and (3) definition of a project plan and specification for technology development. The first of these tasks reviewed current data storage technology and developed a prioritized set of requirements for the health monitoring and control applications. The second task included a survey of state-of-the-art and newly developing technologies and a matrix-based ranking of the technologies. It culminated in a recommendation of optical disk technology as the best candidate for technology development. The final task defined a proof-of-concept demonstration, including tasks required to develop, test, analyze, and demonstrate the technology advancement, plus an estimate of the level of effort required. The recommended demonstration emphasizes development of an optical disk system which incorporates an order-of-magnitude increase in writing speed above the current state of the art.
NASA Technical Reports Server (NTRS)
Johnson, Charles W.
2011-01-01
The vision of the Unmanned Aircraft System (UAS) Integration in the National Airspace System (NAS) Project is "A global transportation system which allows routine access for all classes of UAS." The goal of the UAS Integration in the NAS Project is to "contribute capabilities that reduce technical barriers related to the safety and operational challenges associated with enabling routine UAS access to the NAS." This goal will be accomplished through a two-phased approach based on development of system-level integration of key concepts, technologies and/or procedures, and demonstrations of integrated capabilities in an operationally relevant environment. Phase 1 will take place the first two years of the Project and Phase 2 will take place the following three years. The Phase 1 and 2 technical objectives are: Phase 1: Developing a gap analysis between current state of the art and the Next Generation Air Transportation System (NextGen) UAS Concept of Operations . Validating the key technical areas identified by this Project . Conducting initial modeling, simulation, and flight testing activities . Completing Sub-project Phase 1 deliverables (spectrum requirements, comparative analysis of certification methodologies, etc.) and continue Phase 2 preparation (infrastructure, tools, etc.) Phase 2: Providing regulators with a methodology for developing airworthiness requirements for UAS, and data to support development of certifications standards and regulatory guidance . Providing systems-level, integrated testing of concepts and/or capabilities that address barriers to routine access to the NAS. Through simulation and flight testing, address issues including separation assurance, communications requirements, and human systems integration in operationally relevant environments. The UAS in the NAS Project will demonstrate solutions in specific technology areas, which will address operational/safety issues related to UAS access to the NAS. Since the resource allocation for this Project is limited ($150M over the five years), the focus is on reducing the technical barriers where NASA has unique capabilities. As a result, technical areas, such as Sense and Avoid (SAA) and beyond line of sight command and control will not be addressed. While these are critical barriers to UAS access, currently, there is a great deal of global effort being exercised to address these challenge areas. Instead, specific technology development in areas where there is certainty that NASA can advance the research to high technology readiness levels will be the Project's focus. Specific sub-projects include Separation Assurance, Human Systems Integration, Communications, Certification, and Integrated Test and Evaluation. Each sub-project will transfer technologies to relevant key stakeholders and decision makers through research transition teams, technology forums, or through other analogous means.
2011-12-01
systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical
NASA Software Documentation Standard
NASA Technical Reports Server (NTRS)
1991-01-01
The NASA Software Documentation Standard (hereinafter referred to as "Standard") is designed to support the documentation of all software developed for NASA; its goal is to provide a framework and model for recording the essential information needed throughout the development life cycle and maintenance of a software system. The NASA Software Documentation Standard can be applied to the documentation of all NASA software. The Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. The basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.
Ceramic Technology Project semiannual progress report, October 1992--March 1993
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, D.R.
1993-09-01
This project was developed to meet the ceramic technology requirements of the OTS`s automotive technology programs. Although progress has been made in developing reliable structural ceramics, further work is needed to reduce cost. The work described in this report is organized according to the following work breakdown structure project elements: Materials and processing (monolithics [Si nitride, carbide], ceramic composites, thermal and wear coatings, joining, cost effective ceramic machining), materials design methodology (contact interfaces, new concepts), data base and life prediction (structural qualification, time-dependent behavior, environmental effects, fracture mechanics, nondestructive evaluation development), and technology transfer.
Initiating the 2002 Mars Science Laboratory (MSL) Focused Technology Program
NASA Technical Reports Server (NTRS)
Caffrey, Robert T.; Udomkesmalee, Gabriel; Hayati, Samad A.
2004-01-01
The Mars Science Laboratory (MSL) Project is an aggressive mission launching in 2009 to deliver a new generation of rover safely to the surface of Mars and conduct comprehensive in situ investigations using a new generation of instruments. This system will be designed to land with precision and be capable of operating over a large percentage on the surface of Mars. It will have capabilities that will support NASA's scientific goals into the next decade of exphation. The MSL Technology program is developing a wide-range of technologies needed for this Mission and potentially other space missions. The MSL Technology Program reports to both the MSL Project and the Mars Technology Program (MTP). The dual reporting process creates a challenging management situation, but ensures the new technology meets both the specific MSL requirements and the broader Mars Program requirements. MTP is a NASA-wide technology development program managed by the Jet Propulsion Laboratory (JPL) and is divided into a Focused Program and a Base Program. The Focused Technology Program addresses technologies that are specific and critical to near-term missions, while the Base Technology Program addresses those technologies that are applicable to multiple missions and which can be characterized as longer term, higher risk, and high payoff technologies. The MSL Technology Program is under the Focused Program and is tightly coupled to MSL's mission milestones and deliverables. The technology budget is separate from the flight Project budget, but the technology s requirements and the development process are tightly coordinated with the Project. The Technology Program combines proven management techniques of flight projects with commercial and academic technology management strategies, to create a technology management program that meets the near-term requirements of MSL and the long-term requirements of MTP. This paper examines the initiation of 2002 MSL Technology program. Some of the areas discussed in this paper include technology definition, task selection, technology management, and technology assessment.
The Role of Education in Agricultural Projects for Food Security and Poverty Reduction in Kenya
NASA Astrophysics Data System (ADS)
Walingo, Mary Khakoni
2006-05-01
Agricultural development projects have been promoted in many places as a feature of poverty-reduction strategies. Such projects have often been implemented without a strong in-built education component, and hence have had little success. Agricultural projects seek to improve food security by diversifying a household's resource base and facilitating the social and economic empowerment of women. The present study presents a survey designed to assess the relationship between education level and ability to benefit from dairy-development projects in Kenya. Results reveal higher occupation and employment levels among beneficiary than non-beneficiary households. On the other hand, beneficiaries of poverty-reduction schemes require specialized training. Apart from project-specific training, the level of general education alone cannot predict the attainment of project objectives.
The JPL functional requirements tool
NASA Technical Reports Server (NTRS)
Giffin, Geoff; Skinner, Judith; Stoller, Richard
1987-01-01
Planetary spacecraft are complex vehicles which are built according to many thousands of requirements. Problems encountered in documenting and maintaining these requirements led to the current attempt to reduce or eliminate these problems by a computer automated data base Functional Requirements Tool. The tool developed at JPL and in use on several JPL Projects is described. The organization and functionality of the Tool, together with an explanation of the data base inputs, their relationships, and use are presented. Methods of interfacing with external documents, representation of tables and figures, and methods of approval and change processing are discussed. The options available for disseminating information from the Tool are identified. The implementation of the Requirements Tool is outlined, and the operation is summarized. The conclusions drawn from this work is that the Requirements Tool represents a useful addition to the System Engineer's Tool kit, it is not currently available elsewhere, and a clear development path exists to expand the capabilities of the Tool to serve larger and more complex projects.
NASA Technical Reports Server (NTRS)
1982-01-01
The programmatic data for the reference concept of the Manned Space Platform is presented. Details regarding work breakdown structure (WBS) and dictionary, the facilities and equipment required to produce the modules, the project schedule and logic diagram, a preliminary assessment of environmental impacts and details regarding the estimated costs for the reference concept are included. The proposed WBS which was developed to provide summary and system level segregation of the nonrecurring and recurring portions of the Manned Space Platform project is also included. The accompanying dictionary outlines the function and activities contained within each WBS element. The facility and equipment required to produce the various modules is discussed. Generally, required equipment is within the existing state of the art although the size of some of the items to be manufactured is a consideration. A preliminary manufacturing flow was also provided. The project schedules presented consist of the Master Project Summary Schedule, the Master Project Phasing Chart and the Logic Network.
NASA Astrophysics Data System (ADS)
Martin, Gene; Criscione, Joseph C.; Cauffman, Sandra A.; Davis, Martin A.
2004-11-01
The Hyperspectral Environmental Suite (HES) instrument is currently under development by the NASA GOES-R Project team within the framework of the GOES Program to fulfill the future needs and requirements of the National Environmental Satellite, Data, and Information Service (NESDIS) Office. As part of the GOES-R instrument complement, HES will provide measurements of the traditional temperature and water vapor vertical profiles with higher accuracy and vertical resolution than obtained through current sounder technologies. HES will provide measurements of the properties of the shelf and coastal waters and back up imaging (at in-situ resolution) for the GOES-R Advanced Baseline Imager (ABI). The HES team is forging the future of remote environmental monitoring with the development of an operational instrument with high temporal, spatial and spectral-resolution and broad hemispheric coverage. The HES development vision includes threshold and goal requirements that encompass potential system solutions. The HES team has defined tasks for the instrument(s) that include a threshold functional complement of Disk Sounding (DS), Severe Weather/Mesoscale Sounding (SW/M), and Shelf and Coastal Waters imaging (CW) and a goal functional complement of Open Ocean (OO) imaging, and back up imaging (at in-situ resolution) for the GOES-R Advanced Baseline Imager (ABI). To achieve the best-value procurement, the GOES-R Project has base-lined a two-phase procurement approach to the HES design and development; a Formulation/study phase and an instrument Implementation phase. During Formulation, currently slated for the FY04-05 timeframe, the developing team(s) will perform Systems Requirements Analysis and evaluation, System Trade and Requirements Baseline Studies, Risk Assessment and Mitigation Strategy and complete a Preliminary Conceptual Design of the HES instrument. The results of the formulation phase will be leveraged to achieve an effective and efficient system solution during the Implementation Phase scheduled to begin FY05 for a resultant FY12 launch. The magnitude of complexity of the HES development requires an appreciation of the technologies required to achieve the functional objectives. To this end, the GOES-R project team is making available all NASA developed technologies to potential HES vendors, including, the NASA New Millennium Program"s (NMP) Earth Observing-3, Geostationary Imaging Fourier Transform Spectrometer (GIFTS) instrument developed technologies, as applicable. It is anticipated that the instrument(s) meeting the HES requirements will be either a dispersive spectrometer or an interferometric spectrometer or perhaps a combination. No instrument configuration is preferred or favored by the Government. This paper outlines the HES development plan; including an overview of current requirements, existing partnerships and the GOES-R project methodologies to achieve the advanced functional objectives of the GOES Program partnership.
NASA Technical Reports Server (NTRS)
Depenbrock, Brett T.; Balint, Tibor S.; Sheehy, Jeffrey A.
2014-01-01
Research and development organizations that push the innovation edge of technology frequently encounter challenges when attempting to identify an investment strategy and to accurately forecast the cost and schedule performance of selected projects. Fast moving and complex environments require managers to quickly analyze and diagnose the value of returns on investment versus allocated resources. Our Project Assessment Framework through Design (PAFTD) tool facilitates decision making for NASA senior leadership to enable more strategic and consistent technology development investment analysis, beginning at implementation and continuing through the project life cycle. The framework takes an integrated approach by leveraging design principles of useability, feasibility, and viability and aligns them with methods employed by NASA's Independent Program Assessment Office for project performance assessment. The need exists to periodically revisit the justification and prioritization of technology development investments as changes occur over project life cycles. The framework informs management rapidly and comprehensively about diagnosed internal and external root causes of project performance.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rogger, Cyrill; Beaurain, Francois; Schmidt, Tobias S., E-mail: tobiasschmidt@ethz.ch
2011-01-15
The Clean Development Mechanism (CDM) of the Kyoto Protocol aims to reduce greenhouse gas emissions in developing countries and at the same time to assist these countries in sustainable development. While composting as a suitable mitigation option in the waste sector can clearly contribute to the former goal there are indications that high rents can also be achieved regarding the latter. In this article composting is compared with other CDM project types inside and outside the waste sector with regards to both project numbers and contribution to sustainable development. It is found that, despite the high number of waste projects,more » composting is underrepresented and a major reason for this fact is identified. Based on a multi-criteria analysis it is shown that composting has a higher potential for contribution to sustainable development than most other best in class projects. As these contributions can only be assured if certain requirements are followed, eight key obligations are presented.« less
A COMPREHENSIVE TECHNICAL REVIEW OF THE DEMONSTRATION BULK VITRIFICATION SYSTEM
DOE Office of Scientific and Technical Information (OSTI.GOV)
SCHAUS, P.S.
2006-09-29
In May 2006, CH2M Hill Hanford Group, Inc. chartered an Expert Review Panel (ERP) to review the current status of the Demonstration Bulk Vitrification System (DBVS). It is the consensus of the ERP that bulk vitrification is a technology that requires further development and evaluation to determine its potential for meeting the Hanford waste stabilization mission. No fatal flaws (issues that would jeopardize the overall DBVS mission that cannot be mitigated) were found, given the current state of the project. However, a number of technical issues were found that could significantly affect the project's ability to meet its overall missionmore » as stated in the project ''Justification of Mission Need'' document, if not satisfactorily resolved. The ERP recognizes that the project has changed from an accelerated schedule demonstration project to a formally chartered project that must be in full compliance with DOE 413.3 requirements. The perspective of the ERP presented herein, is measured against the formally chartered project as stated in the approved Justification of Mission Need document. A justification of Mission Need document was approved in July 2006 which defined the objectives for the DBVS Project. In this document, DOE concluded that bulk vitrification is a viable technology that requires additional development to determine its potential applicability to treatment of a portion of the Hanford low activity waste. The DBVS mission need statement now includes the following primary objectives: (1) process approximately 190,000 gallons of Tank S-109 waste into fifty 100 metric ton boxes of vitrified product; (2) store and dispose of these boxes at Hanford's Integrated Disposal Facility (IDF); (3) evaluate the waste form characteristics; (4) gather pilot plant operability data, and (5) develop the overall life cycle system performance of bulk vitrification and produce a comparison of the bulk vitrification process to building a second LAW Immobilization facility or other supplemental treatment alternatives as provided in M-62-08.« less
Systems engineering implementation in the preliminary design phase of the Giant Magellan Telescope
NASA Astrophysics Data System (ADS)
Maiten, J.; Johns, M.; Trancho, G.; Sawyer, D.; Mady, P.
2012-09-01
Like many telescope projects today, the 24.5-meter Giant Magellan Telescope (GMT) is truly a complex system. The primary and secondary mirrors of the GMT are segmented and actuated to support two operating modes: natural seeing and adaptive optics. GMT is a general-purpose telescope supporting multiple science instruments operated in those modes. GMT is a large, diverse collaboration and development includes geographically distributed teams. The need to implement good systems engineering processes for managing the development of systems like GMT becomes imperative. The management of the requirements flow down from the science requirements to the component level requirements is an inherently difficult task in itself. The interfaces must also be negotiated so that the interactions between subsystems and assemblies are well defined and controlled. This paper will provide an overview of the systems engineering processes and tools implemented for the GMT project during the preliminary design phase. This will include requirements management, documentation and configuration control, interface development and technical risk management. Because of the complexity of the GMT system and the distributed team, using web-accessible tools for collaboration is vital. To accomplish this GMTO has selected three tools: Cognition Cockpit, Xerox Docushare, and Solidworks Enterprise Product Data Management (EPDM). Key to this is the use of Cockpit for managing and documenting the product tree, architecture, error budget, requirements, interfaces, and risks. Additionally, drawing management is accomplished using an EPDM vault. Docushare, a documentation and configuration management tool is used to manage workflow of documents and drawings for the GMT project. These tools electronically facilitate collaboration in real time, enabling the GMT team to track, trace and report on key project metrics and design parameters.
ERIC Educational Resources Information Center
Qurban, Mustafa H.; Austria, Richmond D.
2009-01-01
The improvement of communication skills among Information Systems (IS) developers can be considered as a strategy to mitigate the risk of project failure during IS design. This paper addresses issues on various communication barriers normally encountered during its requirements elicitation (RE) stage. This study aims to adopt experiential learning…
Code of Federal Regulations, 2010 CFR
2010-10-01
... HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Notification (prioritization Process, Planning, Development and Construction) § 137.320 Is the Secretary required to consult with affected Indian Tribes...
DOT National Transportation Integrated Search
1997-06-04
In June 1995, the FAA developed a "total requirements" estimate for the period : FY 97-FY 02 to help explain the difficulty of supporting a dynamic, growing : aviation industry under a federal budget picture which projected flat or reduced : funding ...
Status of NASA's Advanced Radioisotope Power Conversion Technology Research and Development
NASA Technical Reports Server (NTRS)
Wong, Wayne A.; Anderson, David J.; Tuttle, Karen L.; Tew, Roy C.
2006-01-01
NASA s Advanced Radioisotope Power Systems (RPS) development program is funding the advancement of next generation power conversion technologies that will enable future missions that have requirements that can not be met by either the ubiquitous photovoltaic systems or by current Radioisotope Power Systems (RPS). Requirements of advanced radioisotope power systems include high efficiency and high specific power (watts/kilogram) in order to meet mission requirements with less radioisotope fuel and lower mass. Other Advanced RPS development goals include long-life, reliability, and scalability so that these systems can meet requirements for a variety of future space applications including continual operation surface missions, outer-planetary missions, and solar probe. This paper provides an update on the Radioisotope Power Conversion Technology Project which awarded ten Phase I contracts for research and development of a variety of power conversion technologies consisting of Brayton, Stirling, thermoelectrics, and thermophotovoltaics. Three of the contracts continue during the current Phase II in the areas of thermoelectric and Stirling power conversion. The accomplishments to date of the contractors, project plans, and status will be summarized.
Structured Innovation of High-Performance Wave Energy Converter Technology: Preprint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weber, Jochem W.; Laird, Daniel
Wave energy converter (WEC) technology development has not yet delivered the desired commercial maturity nor, and more importantly, the techno-economic performance. The reasons for this have been recognized and fundamental requirements for successful WEC technology development have been identified. This paper describes a multi-year project pursued in collaboration by the National Renewable Energy Laboratory and Sandia National Laboratories to innovate and develop new WEC technology. It specifies the project strategy, shows how this differs from the state-of-the-art approach and presents some early project results. Based on the specification of fundamental functional requirements of WEC technology, structured innovation and systemic problemmore » solving methodologies are applied to invent and identify new WEC technology concepts. Using Technology Performance Levels (TPL) as an assessment metric of the techno-economic performance potential, high performance technology concepts are identified and selected for further development. System performance is numerically modelled and optimized and key performance aspects are empirically validated. The project deliverables are WEC technology specifications of high techno-economic performance technologies of TPL 7 or higher at TRL 3 with some key technology challenges investigated at higher TRL. These wave energy converter technology specifications will be made available to industry for further, full development and commercialisation (TRL 4 - TRL 9).« less
Industry-Supported Team Students' Projects.
ERIC Educational Resources Information Center
Glozman, Vladimir
The industry-supported team students' project enhances professional, intellectual, and personal development of students while addressing the needs of local industry. In addition to achieving academic excellence, the students are exposed to industry requirements, and excel in effective oral communication and cooperative teamwork. The teamwork…
NASA Technical Reports Server (NTRS)
Ellerby, D.; Blosser, M.; Boghozian, T.; Chavez-Garcia, J.; Chinnapongse, R.; Fowler, M.; Gage, P.; Gasch, M.; Gonzales, G.; Hamm, K.;
2016-01-01
This poster provides an overview of the requirements, design, development and testing of the 3D Woven TPS being developed under NASA's Heatshield for Extreme Entry Environment Technology (HEEET) project. Under this current program, NASA is working to develop a Thermal Protection System (TPS) capable of surviving entry into Saturn. A primary goal of the project is to build and test an Engineering Test Unit (ETU) to establish a Technical Readiness Level (TRL) of 6 for this technology by 2017.
Heatshield for Extreme Entry Environment Technology (HEEET) Development and Maturation Status
NASA Technical Reports Server (NTRS)
Ellerby, D.; Boghozian, T.; Driver, D.; Chavez-Garcia, J.; Fowler, M.; Gage, P.; Gasch, M.; Gonzales, G.; Kazemba, C.; Kellermann, C.;
2018-01-01
This poster provides an overview of the requirements, design, development and testing of the 3D (Three Dimensional) Woven TPS (Thermal Protection System) being developed under NASA's Heatshield for Extreme Entry Environment Technology (HEEET) project. Under this current program, NASA is working to develop a TPS capable of surviving entry into Saturn. A primary goal of the project is to build and test an Engineering Test Unit (ETU) to establish a Technical Readiness Level (TRL) of 6 for this technology by 2017.
Second Generation RLV Space Vehicle Concept
NASA Astrophysics Data System (ADS)
Bailey, M. D.; Daniel, C. C.
2002-01-01
NASA has a long history of conducting development programs and projects in a consistant fashion. Systems Engineering within those programs and projects has also followed a given method outlined by such documents as the NASA Systems Engineering Handbook. The relatively new NASA Space Launch Initiative (SLI) is taking a new approach to developing a space vehicle, with innovative management methods as well as new Systems Engineering processes. With the program less than a year into its life cycle, the efficacy of these new processes has yet to be proven or disproven. At 776M for phase I, SLI represents a major portion of the NASA focus; however, the new processes being incorporated are not reflected in the training provided by NASA to its engineers. The NASA Academy of Program and Project Leadership (APPL) offers core classes in program and project management and systems engineering to NASA employees with the purpose of creating a "knowledge community where ideas, skills, and experiences are exchanged to increase each other's capacity for strong leadership". The SLI program is, in one sense, a combination of a conceptual design program and a technology program. The program as a whole doesn't map into the generic systems engineering project cycle as currently, and for some time, taught. For example, the NASA APPL Systems Engineering training course teaches that the "first step in developing an architecture is to define the external boundaries of the system", which will require definition of the interfaces with other systems and the next step will be to "define all the components that make up the next lower level of the system hierarchy" where fundamental requirements are allocated to each component. Whereas, the SLI technology risk reduction approach develops architecture subsystem technologies prior to developing architectures. The higher level architecture requirements are not allowed to fully develop and undergo decomposition and allocation down to the subsystems before the subsystems must develop allocated requirements based on the highest level of requirements. In the vernacular of the project cycles prior to the mid 1990's, the architecture definition portion of the program appears to be at a generic Phase A stage, while the subsystems are operating at Phase B. Even the management structure of the SLI program is innovative in its approach to Systems Engineering and is not reflected in the APPL training modules. The SLI program has established a Systems Engineering office as an office separate from the architecture development or the subsystem technology development, while that office does have representatives within these other offices. The distributed resources of the Systems Engineering Office are co=located with the respect Project Offices. This template is intended to provide systems engineering as an integrated function at the Program Level. . Undoubtedly, the program management of SLI and the NIAT agree that "program/project managers and the systems engineering team must work closely together towards the single objective of delivering quality products that meet the customer needs". This paper will explore the differences between the methods being taught by NASA, which represent decades of ideas, and those currently in practice in SLI. Time will tell if the innovation employed by SLI will prove to be the model of the future. For now, it is suggested that the training of the present exercise the flexibility of recognizing the new processes employed by a major new NASA program.
Second Generation RLV Space Vehicle Concept
NASA Technical Reports Server (NTRS)
Bailey, Michelle; Daniel, Charles; Throckmorton, David A. (Technical Monitor)
2002-01-01
NASA has a long history of conducting development programs and projects in a consistent fashion. Systems Engineering within those programs and projects has also followed a given method outlined by such documents as the NASA Systems Engineering Handbook. The relatively new NASA Space Launch Initiative (SLI) is taking a new approach to developing a space vehicle, with innovative management methods as well as new Systems Engineering processes. With the program less than a year into its life cycle, the efficacy of these new processes has yet to be proven or disproven. At $776M for phase 1, SLI represents a major portion of the NASA focus; however, the new processes being incorporated are not reflected in the training provided by NASA to its engineers. The NASA Academy of Program and Project Leadership (APPL) offers core classes in program and project management and systems engineering to NASA employees with the purpose of creating a "knowledge community where ideas, skills, and experiences are exchanged to increase each other's capacity for strong leadership". The SLI program is, in one sense, a combination of a conceptual design program and a technology program. The program as a whole doesn't map into the generic systems engineering project cycle as currently, and for some time, taught. For example, the NASA APPL Systems Engineering training course teaches that the "first step in developing an architecture is to define the external boundaries of the system", which will require definition of the interfaces with other systems and the next step will be to "define all the components that make up the next lower level of the system hierarchy" where fundamental requirements are allocated to each component. Whereas, the SLI technology risk reduction approach develops architecture subsystem technologies prior to developing architectures. The higher level architecture requirements are not allowed to fully develop and undergo decomposition and allocation down to the subsystems before the subsystems must develop allocated requirements based on the highest level of requirements. In the vernacular of the project cycles prior to the mid 1990's, the architecture definition portion of the program appears to be at a generic Phase A stage, while the subsystems are operating at Phase B. Even the management structure of the SLI program is innovative in its approach to Systems Engineering and is not reflected in the APPL training modules. The SLI program has established a Systems Engineering office as an office separate from the architecture development or the subsystem technology development, while that office does have representatives within these other offices. The distributed resources of the Systems Engineering Office are co-located with the respective Project Offices. This template is intended to provide systems engineering as an integrated function at the Program Level. the program management of SLI and the MAT agree that "program/project managers and the systems engineering team must work closely together towards the single objective of delivering quality products that meet the customer needs". This paper will explore the differences between the methods being taught by NASA, which represent decades of ideas, and those currently in practice in SLI. Time will tell if the innovation employed by SLI will prove to be the model of the future. For now, it is suggested that the training of the present exercise the flexibility of recognizing the new processes employed by a major new NASA program.
Biosignal PI, an Affordable Open-Source ECG and Respiration Measurement System
Abtahi, Farhad; Snäll, Jonatan; Aslamy, Benjamin; Abtahi, Shirin; Seoane, Fernando; Lindecrantz, Kaj
2015-01-01
Bioimedical pilot projects e.g., telemedicine, homecare, animal and human trials usually involve several physiological measurements. Technical development of these projects is time consuming and in particular costly. A versatile but affordable biosignal measurement platform can help to reduce time and risk while keeping the focus on the important goal and making an efficient use of resources. In this work, an affordable and open source platform for development of physiological signals is proposed. As a first step an 8–12 leads electrocardiogram (ECG) and respiration monitoring system is developed. Chips based on iCoupler technology have been used to achieve electrical isolation as required by IEC 60601 for patient safety. The result shows the potential of this platform as a base for prototyping compact, affordable, and medically safe measurement systems. Further work involves both hardware and software development to develop modules. These modules may require development of front-ends for other biosignals or just collect data wirelessly from different devices e.g., blood pressure, weight, bioimpedance spectrum, blood glucose, e.g., through Bluetooth. All design and development documents, files and source codes will be available for non-commercial use through project website, BiosignalPI.org. PMID:25545268
ERIC Educational Resources Information Center
What Works Clearinghouse, 2010
2010-01-01
Project CRISS[R] (CReating Independence through Student-owned Strategies) is a professional development program for teachers that aims to improve reading, writing, and learning for 3rd- through 12th-grade students. The implementation of Project CRISS[R] does not require a change in the curriculum or materials being used in the classroom, but…
ERIC Educational Resources Information Center
Goyette, Sharon Ramos; DeLuca, Jane
2007-01-01
The following project aimed at promoting integrated and long-lasting learning is described for an Immunology course, but it may be adapted to other disciplines. Students were asked to develop and carry out a research project to examine the relationship between immune function and stress. The experiments were required to include the assessment of…
2017-03-01
address challenges in managing projects to build medical facilities. In response to statutory requirements and additional congressional direction, VA...is outsourcing management of certain such projects to the U.S. Army Corps of Engineers (USACE). As of October 2016, VA had 23 ongoing projects...costing $100 million or more. VA and USACE have entered into interagency agreements for 12 of these 23 projects. The agreements entail USACE’s managing
Nelson, Joan M; Cook, Paul F; Raterink, Ginger
2013-01-01
The past several years have seen explosive growth in the number of doctor of nursing practice (DNP) degree programs offered by colleges of nursing in the United States. Through a process of trial and error since 2005, the faculty at the University of Colorado, College of Nursing, have revised the course structure and procedures related to the DNP capstone project to improve the quality and usefulness of these student projects. Efforts have focused on educating and involving all nursing faculty in the DNP capstone process, distinguishing between competencies for our PhD and DNP projects, clearly aligning the DNP capstone project with quality improvement methods rather than with research, working with our campus institutional review board to clarify regulatory review requirements for quality improvement studies, developing a review committee to oversee DNP students' projects, and structuring our sequential course requirements to encourage students' professional presentations and publications. Our current capstone process reflects 7 years of iterative work, which we summarize in this article in hopes that it will help institutions currently in the process of developing a DNP program. Copyright © 2013 Elsevier Inc. All rights reserved.
Civilian Radioactive Waste Management System Requirements Document
DOE Office of Scientific and Technical Information (OSTI.GOV)
C.A. Kouts
2006-05-10
The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible formore » design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further defining system element functions, decomposing requirements into significantly greater detail, and developing designs of system components, facilities, and equipment. The CRD addresses the identification and control of functional, physical, and operational boundaries between and within CRWMS elements. The CRD establishes requirements regarding key interfaces between the CRWMS and elements external to the CRWMS. Project elements define interfaces between CRWMS program elements. The Program has developed a change management process consistent with DOE Order 413.3-Change 1. Changes to the Secretarial Acquisition Executive and Program-level baselines must be approved by a Program Baseline Change Control Board. Specific thresholds have been established for identifying technical, cost, and schedule changes that require approval. The CRWMS continually evaluates system design and operational concepts to optimize performance and/or cost. The Program has developed systems analysis tools to assess potential enhancements to the physical system and to determine the impacts from cost saving initiatives, scientific and technological improvements, and engineering developments. The results of systems analyses, if appropriate, are factored into revisions to the CRD as revised Programmatic Requirements.« less
Collaborative Mission Design at NASA Langley Research Center
NASA Technical Reports Server (NTRS)
Gough, Kerry M.; Allen, B. Danette; Amundsen, Ruth M.
2005-01-01
NASA Langley Research Center (LaRC) has developed and tested two facilities dedicated to increasing efficiency in key mission design processes, including payload design, mission planning, and implementation plan development, among others. The Integrated Design Center (IDC) is a state-of-the-art concurrent design facility which allows scientists and spaceflight engineers to produce project designs and mission plans in a real-time collaborative environment, using industry-standard physics-based development tools and the latest communication technology. The Mission Simulation Lab (MiSL), a virtual reality (VR) facility focused on payload and project design, permits engineers to quickly translate their design and modeling output into enhanced three-dimensional models and then examine them in a realistic full-scale virtual environment. The authors were responsible for envisioning both facilities and turning those visions into fully operational mission design resources at LaRC with multiple advanced capabilities and applications. In addition, the authors have created a synergistic interface between these two facilities. This combined functionality is the Interactive Design and Simulation Center (IDSC), a meta-facility which offers project teams a powerful array of highly advanced tools, permitting them to rapidly produce project designs while maintaining the integrity of the input from every discipline expert on the project. The concept-to-flight mission support provided by IDSC has shown improved inter- and intra-team communication and a reduction in the resources required for proposal development, requirements definition, and design effort.
A Pathway to Continued Success on the Job. A Final Report, July 1, 1998-June 30, 1999 [and] Product.
ERIC Educational Resources Information Center
Cort, Maureen A.; Pappalardo, Michele F.; Gonzalez, Manuel A.
This manual was developed by a project to create a model program that integrates basic skills instruction with requirements of welfare reform, and the project's final report describes activities taken to develop the manual. The report details the problem, goals, procedures, objectives met and not met, and an evaluation. The manual is designed to…
Spacecraft Internal Acoustic Environment Modeling
NASA Technical Reports Server (NTRS)
Chu, S. Reynold; Allen, Chris
2009-01-01
The objective of the project is to develop an acoustic modeling capability, based on commercial off-the-shelf software, to be used as a tool for oversight of the future manned Constellation vehicles. The use of such a model will help ensure compliance with acoustic requirements. Also, this project includes modeling validation and development feedback via building physical mockups and conducting acoustic measurements to compare with the predictions.
Requirements Engineering in Building Climate Science Software
NASA Astrophysics Data System (ADS)
Batcheller, Archer L.
Software has an important role in supporting scientific work. This dissertation studies teams that build scientific software, focusing on the way that they determine what the software should do. These requirements engineering processes are investigated through three case studies of climate science software projects. The Earth System Modeling Framework assists modeling applications, the Earth System Grid distributes data via a web portal, and the NCAR (National Center for Atmospheric Research) Command Language is used to convert, analyze and visualize data. Document analysis, observation, and interviews were used to investigate the requirements-related work. The first research question is about how and why stakeholders engage in a project, and what they do for the project. Two key findings arise. First, user counts are a vital measure of project success, which makes adoption important and makes counting tricky and political. Second, despite the importance of quantities of users, a few particular "power users" develop a relationship with the software developers and play a special role in providing feedback to the software team and integrating the system into user practice. The second research question focuses on how project objectives are articulated and how they are put into practice. The team seeks to both build a software system according to product requirements but also to conduct their work according to process requirements such as user support. Support provides essential communication between users and developers that assists with refining and identifying requirements for the software. It also helps users to learn and apply the software to their real needs. User support is a vital activity for scientific software teams aspiring to create infrastructure. The third research question is about how change in scientific practice and knowledge leads to changes in the software, and vice versa. The "thickness" of a layer of software infrastructure impacts whether the software team or users have control and responsibility for making changes in response to new scientific ideas. Thick infrastructure provides more functionality for users, but gives them less control of it. The stability of infrastructure trades off against the responsiveness that the infrastructure can have to user needs.
Goals Analysis Procedure Guidelines for Applying the Goals Analysis Process
NASA Technical Reports Server (NTRS)
Motley, Albert E., III
2000-01-01
One of the key elements to successful project management is the establishment of the "right set of requirements", requirements that reflect the true customer needs and are consistent with the strategic goals and objectives of the participating organizations. A viable set of requirements implies that each individual requirement is a necessary element in satisfying the stated goals and that the entire set of requirements, taken as a whole, is sufficient to satisfy the stated goals. Unfortunately, it is the author's experience that during project formulation phases' many of the Systems Engineering customers do not conduct a rigorous analysis of the goals and objectives that drive the system requirements. As a result, the Systems Engineer is often provided with requirements that are vague, incomplete, and internally inconsistent. To complicate matters, most systems development methodologies assume that the customer provides unambiguous, comprehensive and concise requirements. This paper describes the specific steps of a Goals Analysis process applied by Systems Engineers at the NASA Langley Research Center during the formulation of requirements for research projects. The objective of Goals Analysis is to identify and explore all of the influencing factors that ultimately drive the system's requirements.
13 CFR 306.2 - Award requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...
13 CFR 306.2 - Award requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...
13 CFR 306.2 - Award requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...
13 CFR 306.2 - Award requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...
34 CFR 403.190 - What are the requirements for receiving a subgrant or contract?
Code of Federal Regulations, 2011 CFR
2011-07-01
... students with individualized education programs developed under the IDEA; (2) Provide assurances that— (i... requirement of section 626 of the IDEA; (2) Assess the special needs of students participating in projects...
10 CFR 609.4 - Submission of Pre-Applications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... assets or facilities); (c) A business plan which includes an overview of the proposed project, including... project investment, development, construction, operation and maintenance; (2) A description of the new or...-Application these requirements are addressed; (d) A financing plan overview describing: (1) The amount of...
ERIC Educational Resources Information Center
McManus, Marilyn C., Ed.
1987-01-01
This issue focuses on assisting adolescents with serious emotional handicaps to make transitions from youth serving systems into society. A framework for developing transition-oriented programs is prevented that incorporates into the specific service goals of the current environment the skills required to function in the projected environment.…
Optimal design of hybrid electric-human powered lightweight transportation
DOT National Transportation Integrated Search
2001-07-01
The goal of this project was to develop a lightweight and efficient hybrid bicycle design. A series approach to design of the hybrid bicycle was used to allow for more technical advances to be made. This approach required the project to be divided in...
Support to 2nd Generation RLV Propulsion Project Office
NASA Technical Reports Server (NTRS)
Lee, Thomas J.
2002-01-01
In this final report regarding support to the second generation RLV (Reusable Launch Vehicle) propulsion project office, a list of tasks accomplished is presented. During this period, Lee & Associates, LLC participated in numerous Systems Requirements Reviews (SRR) related to the Cobra development program.
Report #10-X-0175, August 2, 2010. EPA developed two forms of guidance that discuss the need for recipients to display a Recovery Act logo to communicate to the public that the project is a Recovery Act investment.
Support of US CLIVAR Project Office 2012
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cummings, Donna
Director of JOSS, supervised the U.S. CLIVAR Project Office Director and helped direct the officer to enhance the goals and objectives of the U.S. CLIVAR Project and budget. Financial Manager of JOSS, worked to complete proposals and monitor compliance with award requirements and funding limitations and ensure the U.S. CLIVAR Project Office complied with UCAR policies and procedures. Project Coordinator administered the funding for the U.S. CLIVAR Project Office and was responsible for coordinating special projects that required additional support from JOSS technical staff. These projects included activities such as website updates, technology upgrades, production of printed reports, and developmentmore » of graphic elements like logos. Web Developer worked both on web development and graphic work and the work consisted of the following: Maintaining the site ? installing updates to Drupal CMS (Content Management System). Creating new templates for webpages and styling them with CSS and JavaScript/jQuery code. Fixing the styling on webpages that the content contributor/manager (Jenn Mays) created and has had trouble with. Creating new web forms for abstract uploading, subscriptions, and meeting registrations. Created 4 webpages for the ?ASP: Key Uncertainties in the Global Carbon-Cycle? meeting. Developed a document review form, instruction webpages, login redirect, dynamic table with form submissions for the US CLIVAR SSC Science Plan Document Review. This was open to the public from June 12, 2013 until July 10, 2013. During this time the user accounts had to be checked (daily) that were created by the public, to delete any spam ones. Graphics work: preparing images for general use on webpages, webpage banners, and for meeting name badges, creating a US CLIVAR letterhead, redesigning the US AMOC logo. System Administrator spent time working on the migration of the US CLIVAR site from the USGCRP office to UCAR here Boulder. This was done to increase the general speed of the site & to allow the web developer to work in it more efficiently. Main tasks were to Archive the old Site, create new development site for web developer, and move web address to new website when web developer was finished with development. There are no patients or equipment related to this proposals« less
Stress Free Temperature Testing and Residual Stress Calculations on Out-of-Autoclave Composites
NASA Technical Reports Server (NTRS)
Cox, Sarah; Tate, LaNetra C.; Danley, Susan; Sampson, Jeff; Taylor, Brian; Miller, Sandi
2012-01-01
Future launch vehicles will require the incorporation large composite parts that will make up primary and secondary components of the vehicle. NASA has explored the feasibility of manufacturing these large components using Out-of-Autoclave impregnated carbon fiber composite systems through many composites development projects. Most recently, the Composites for Exploration Project has been looking at the development of a 10 meter diameter fairing structure, similar in size to what will be required for a heavy launch vehicle. The development of new material systems requires the investigation of the material properties and the stress in the parts. Residual stress is an important factor to incorporate when modeling the stresses that a part is undergoing. Testing was performed to verify the stress free temperature with two-ply asymmetric panels. A comparison was done between three newly developed out of autoclave IM7 /Bismalieimide (BMI) systems. This paper presents the testing results and the analysis performed to determine the residual stress of the materials.
Stress Free Temperature Testing and Calculations on Out-of-Autoclave Composites
NASA Technical Reports Server (NTRS)
Cox, Sarah B.; Tate, LeNetra C.; Danley, Susan E.; Sampson, Jeffrey W.; Taylor, Brian J.; Sutter, James K.; Miller, Sandi G.
2013-01-01
Future launch vehicles will require the incorporation of large composite parts that will make up primary and secondary components of the vehicle. NASA has explored the feasibility of manufacturing these large components using Out-of-Autoclave impregnated carbon fiber composite systems through many composites development projects. Most recently, the Composites for Exploration Project has been looking at the development of a 10 meter diameter fairing structure, similar in size to what will be required for a heavy launch vehicle. The development of new material systems requires the investigation of the material properties and the stress in the parts. Residual stress is an important factor to incorporate when modeling the stresses that a part is undergoing. Testing was performed to verify the stress free temperature with two-ply asymmetric panels. A comparison was done between three newly developed out of autoclave IM7/Bismaleimide (BMI) systems. This paper presents the testing results and the analysis performed to determine the stress free temperature of the materials
Wooten, Kevin C; Dann, Sara M; Finnerty, Celeste C; Kotarba, Joseph A
2014-07-01
The development of leadership and project management skills is increasingly important to the evolution of translational science and team-based endeavors. Team science is dependent upon individuals at various stages in their careers, inclusive of postdocs. Data from case histories, as well as from interviews with current and former postdocs, and those supervising postdocs, indicate six essential tasks required of project managers in multidisciplinary translational teams, along with eight skill-related themes critical to their success. To optimize the opportunities available and to ensure sequential development of team project management skills, a life cycle model for the development of translational team skills is proposed, ranging from graduate trainees, postdocs, assistant professors, and finally to mature scientists. Specific goals, challenges and project management roles and tasks are recommended for each stage for the life cycle.
Wooten, Kevin C.; Dann, Sara M.; Finnerty, Celeste C.; Kotarba, Joseph A.
2015-01-01
The development of leadership and project management skills is increasingly important to the evolution of translational science and team-based endeavors. Team science is dependent upon individuals at various stages in their careers, inclusive of postdocs. Data from case histories, as well as from interviews with current and former postdocs, and those supervising postdocs, indicate six essential tasks required of project managers in multidisciplinary translational teams, along with eight skill-related themes critical to their success. To optimize the opportunities available and to ensure sequential development of team project management skills, a life cycle model for the development of translational team skills is proposed, ranging from graduate trainees, postdocs, assistant professors, and finally to mature scientists. Specific goals, challenges and project management roles and tasks are recommended for each stage for the life cycle. PMID:25621288
IEC 61511 and the capital project process--a protective management system approach.
Summers, Angela E
2006-03-17
This year, the process industry has reached an important milestone in process safety-the acceptance of an internationally recognized standard for safety instrumented systems (SIS). This standard, IEC 61511, documents good engineering practice for the assessment, design, operation, maintenance, and management of SISs. The foundation of the standard is established by several requirements in Part 1, Clauses 5-7, which cover the development of a management system aimed at ensuring that functional safety is achieved. The management system includes a quality assurance process for the entire SIS lifecycle, requiring the development of procedures, identification of resources and acquisition of tools. For maximum benefit, the deliverables and quality control checks required by the standard should be integrated into the capital project process, addressing safety, environmental, plant productivity, and asset protection. Industry has become inundated with a multitude of programs focusing on safety, quality, and cost performance. This paper introduces a protective management system, which builds upon the work process identified in IEC 61511. Typical capital project phases are integrated with the management system to yield one comprehensive program to efficiently manage process risk. Finally, the paper highlights areas where internal practices or guidelines should be developed to improve program performance and cost effectiveness.
Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2013-03-01
To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessarymore » private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall« less
Investigation into Cloud Computing for More Robust Automated Bulk Image Geoprocessing
NASA Technical Reports Server (NTRS)
Brown, Richard B.; Smoot, James C.; Underwood, Lauren; Armstrong, C. Duane
2012-01-01
Geospatial resource assessments frequently require timely geospatial data processing that involves large multivariate remote sensing data sets. In particular, for disasters, response requires rapid access to large data volumes, substantial storage space and high performance processing capability. The processing and distribution of this data into usable information products requires a processing pipeline that can efficiently manage the required storage, computing utilities, and data handling requirements. In recent years, with the availability of cloud computing technology, cloud processing platforms have made available a powerful new computing infrastructure resource that can meet this need. To assess the utility of this resource, this project investigates cloud computing platforms for bulk, automated geoprocessing capabilities with respect to data handling and application development requirements. This presentation is of work being conducted by Applied Sciences Program Office at NASA-Stennis Space Center. A prototypical set of image manipulation and transformation processes that incorporate sample Unmanned Airborne System data were developed to create value-added products and tested for implementation on the "cloud". This project outlines the steps involved in creating and testing of open source software developed process code on a local prototype platform, and then transitioning this code with associated environment requirements into an analogous, but memory and processor enhanced cloud platform. A data processing cloud was used to store both standard digital camera panchromatic and multi-band image data, which were subsequently subjected to standard image processing functions such as NDVI (Normalized Difference Vegetation Index), NDMI (Normalized Difference Moisture Index), band stacking, reprojection, and other similar type data processes. Cloud infrastructure service providers were evaluated by taking these locally tested processing functions, and then applying them to a given cloud-enabled infrastructure to assesses and compare environment setup options and enabled technologies. This project reviews findings that were observed when cloud platforms were evaluated for bulk geoprocessing capabilities based on data handling and application development requirements.
From scenarios to domain models: processes and representations
NASA Astrophysics Data System (ADS)
Haddock, Gail; Harbison, Karan
1994-03-01
The domain specific software architectures (DSSA) community has defined a philosophy for the development of complex systems. This philosophy improves productivity and efficiency by increasing the user's role in the definition of requirements, increasing the systems engineer's role in the reuse of components, and decreasing the software engineer's role to the development of new components and component modifications only. The scenario-based engineering process (SEP), the first instantiation of the DSSA philosophy, has been adopted by the next generation controller project. It is also the chosen methodology of the trauma care information management system project, and the surrogate semi-autonomous vehicle project. SEP uses scenarios from the user to create domain models and define the system's requirements. Domain knowledge is obtained from a variety of sources including experts, documents, and videos. This knowledge is analyzed using three techniques: scenario analysis, task analysis, and object-oriented analysis. Scenario analysis results in formal representations of selected scenarios. Task analysis of the scenario representations results in descriptions of tasks necessary for object-oriented analysis and also subtasks necessary for functional system analysis. Object-oriented analysis of task descriptions produces domain models and system requirements. This paper examines the representations that support the DSSA philosophy, including reference requirements, reference architectures, and domain models. The processes used to create and use the representations are explained through use of the scenario-based engineering process. Selected examples are taken from the next generation controller project.
76 FR 21615 - Nectarines and Peaches Grown in California; Suspension of Handling Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-18
... requirements. The orders also authorize production research and marketing research and development projects, as... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Parts 916 and 917 [Doc. No. AMS-FV... Requirements AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments...
NASA Technical Reports Server (NTRS)
Veres, Joseph P.
2003-01-01
The objective is to develop the capability to numerically model the performance of gas turbine engines used for aircraft propulsion. This capability will provide turbine engine designers with a means of accurately predicting the performance of new engines in a system environment prior to building and testing. The 'numerical test cell' developed under this project will reduce the number of component and engine tests required during development. As a result, the project will help to reduce the design cycle time and cost of gas turbine engines. This capability will be distributed to U.S. turbine engine manufacturers and air framers. This project focuses on goals of maintaining U.S. superiority in commercial gas turbine engine development for the aeronautics industry.
Morpheus Lander Testing Campaign
NASA Technical Reports Server (NTRS)
Hart, Jeremy J.; Mitchell, Jennifer D.
2011-01-01
NASA s Morpheus Project has developed and tested a prototype planetary lander capable of vertical takeoff and landing designed to serve as a testbed for advanced spacecraft technologies. The Morpheus vehicle has successfully performed a set of integrated vehicle test flights including hot-fire and tether tests, ultimately culminating in an un-tethered "free-flight" This development and testing campaign was conducted on-site at the Johnson Space Center (JSC), less than one year after project start. Designed, developed, manufactured and operated in-house by engineers at JSC, the Morpheus Project represents an unprecedented departure from recent NASA programs and projects that traditionally require longer development lifecycles and testing at remote, dedicated testing facilities. This paper documents the integrated testing campaign, including descriptions of test types (hot-fire, tether, and free-flight), test objectives, and the infrastructure of JSC testing facilities. A major focus of the paper will be the fast pace of the project, rapid prototyping, frequent testing, and lessons learned from this departure from the traditional engineering development process at NASA s Johnson Space Center.
Integrated Medical Model (IMM) Project Verification, Validation, and Credibility (VVandC)
NASA Technical Reports Server (NTRS)
Walton, M.; Boley, L.; Keenan, L.; Kerstman, E.; Shah, R.; Young, M.; Saile, L.; Garcia, Y.; Meyers, J.; Reyes, D.
2015-01-01
The Integrated Medical Model (IMM) Project supports end user requests by employing the Integrated Medical Evidence Database (iMED) and IMM tools as well as subject matter expertise within the Project. The iMED houses data used by the IMM. The IMM is designed to forecast relative changes for a specified set of crew health and mission success risk metrics by using a probabilistic model based on historical data, cohort data, and subject matter expert opinion. A stochastic approach is taken because deterministic results would not appropriately reflect the uncertainty in the IMM inputs. Once the IMM was conceptualized, a plan was needed to rigorously assess input information, framework and code, and output results of the IMM, and ensure that end user requests and requirements were considered during all stages of model development and implementation, as well as lay the foundation for external review and application. METHODS: In 2008, the Project team developed a comprehensive verification and validation (VV) plan, which specified internal and external review criteria encompassing 1) verification of data and IMM structure to ensure proper implementation of the IMM, 2) several validation techniques to confirm that the simulation capability of the IMM appropriately represents occurrences and consequences of medical conditions during space missions, and 3) credibility processes to develop user confidence in the information derived from the IMM. When the NASA-STD-7009 (7009) [1] was published, the Project team updated their verification, validation, and credibility (VVC) project plan to meet 7009 requirements and include 7009 tools in reporting VVC status of the IMM. Construction of these tools included meeting documentation and evidence requirements sufficient to meet external review success criteria. RESULTS: IMM Project VVC updates are compiled recurrently and include updates to the 7009 Compliance and Credibility matrices. Reporting tools have evolved over the lifetime of the IMM Project to better communicate VVC status. This has included refining original 7009 methodology with augmentation from the HRP NASA-STD-7009 Guidance Document working group and the NASA-HDBK-7009 [2]. End user requests and requirements are being satisfied as evidenced by ISS Program acceptance of IMM risk forecasts, transition to an operational model and simulation tool, and completion of service requests from a broad end user consortium including operations, science and technology planning, and exploration planning. IMM v4.0 is slated for operational release in the FY015 and current VVC assessments illustrate the expected VVC status prior to the completion of customer lead external review efforts. CONCLUSIONS: The VVC approach established by the IMM Project of incorporating Project-specific recommended practices and guidelines for implementing the 7009 requirements is comprehensive and includes the involvement of end users at every stage in IMM evolution. Methods and techniques used to quantify the VVC status of the IMM Project represented a critical communication tool in providing clear and concise suitability assessments to IMM customers. These processes have not only received approval from the local NASA community but have also garnered recognition by other federal agencies seeking to develop similar guidelines in the medical modeling community.
NASA Astrophysics Data System (ADS)
Scemama, Pierre; Levrel, Harold
2016-01-01
At the national level, with a fixed amount of resources available for public investment in the restoration of biodiversity, it is difficult to prioritize alternative restoration projects. One way to do this is to assess the level of ecosystem services delivered by these projects and to compare them with their costs. The challenge is to derive a common unit of measurement for ecosystem services in order to compare projects which are carried out in different institutional contexts having different goals (application of environmental laws, management of natural reserves, etc.). This paper assesses the use of habitat equivalency analysis (HEA) as a tool to evaluate ecosystem services provided by restoration projects developed in different institutional contexts. This tool was initially developed to quantify the level of ecosystem services required to compensate for non-market impacts coming from accidental pollution in the US. In this paper, HEA is used to assess the cost effectiveness of several restoration projects in relation to different environmental policies, using case studies based in France. Four case studies were used: the creation of a market for wetlands, public acceptance of a port development project, the rehabilitation of marshes to mitigate nitrate loading to the sea, and the restoration of streams in a protected area. Our main conclusion is that HEA can provide a simple tool to clarify the objectives of restoration projects, to compare the cost and effectiveness of these projects, and to carry out trade-offs, without requiring significant amounts of human or technical resources.
Scemama, Pierre; Levrel, Harold
2016-01-01
At the national level, with a fixed amount of resources available for public investment in the restoration of biodiversity, it is difficult to prioritize alternative restoration projects. One way to do this is to assess the level of ecosystem services delivered by these projects and to compare them with their costs. The challenge is to derive a common unit of measurement for ecosystem services in order to compare projects which are carried out in different institutional contexts having different goals (application of environmental laws, management of natural reserves, etc.). This paper assesses the use of habitat equivalency analysis (HEA) as a tool to evaluate ecosystem services provided by restoration projects developed in different institutional contexts. This tool was initially developed to quantify the level of ecosystem services required to compensate for non-market impacts coming from accidental pollution in the US. In this paper, HEA is used to assess the cost effectiveness of several restoration projects in relation to different environmental policies, using case studies based in France. Four case studies were used: the creation of a market for wetlands, public acceptance of a port development project, the rehabilitation of marshes to mitigate nitrate loading to the sea, and the restoration of streams in a protected area. Our main conclusion is that HEA can provide a simple tool to clarify the objectives of restoration projects, to compare the cost and effectiveness of these projects, and to carry out trade-offs, without requiring significant amounts of human or technical resources.
NASA Technical Reports Server (NTRS)
Hayhurst, Kelly J. (Editor)
2008-01-01
The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.
Coal liquefaction processes and development requirements analysis for synthetic fuels production
NASA Technical Reports Server (NTRS)
1980-01-01
Focus of the study is on: (1) developing a technical and programmatic data base on direct and indirect liquefaction processes which have potential for commercialization during the 1980's and beyond, and (2) performing analyses to assess technology readiness and development trends, development requirements, commercial plant costs, and projected synthetic fuel costs. Numerous data sources and references were used as the basis for the analysis results and information presented.
The Role of Project Science in the Chandra X-Ray Observatory
NASA Technical Reports Server (NTRS)
O'Dell, Stephen L.; Weisskopf, Martin C.
2006-01-01
The Chandra X-Ray Observatory, one of NASA's Great Observatories, has an outstanding record of scientific and technical success. This success results from the efforts of a team comprising NASA, its contractors, the Smithsonian Astrophysical Observatory, the instrument groups, and other elements of the scientific community, including thousands of scientists who utilize this powerful facility for astrophysical research. We discuss the role of NASA Project Science in the formulation, development, calibration, and operation of the Chandra X-ray Observatory. In addition to representing the scientific community within the Project, Project Science performed what we term "science systems engineering". This activity encompasses translation of science requirements into technical requirements and assessment of the scientific impact of programmatic and technical trades. We briefly describe several examples of science systems engineering conducted by Chandra Project Science.
The 30/20 GHz communications system functional requirements
NASA Technical Reports Server (NTRS)
Siperko, C. M.; Frankfort, M.; Markham, R.; Wall, M.
1981-01-01
The characteristics of 30/20 GHz usage in satellite systems to be used in support of projected communication requirements of the 1990's are defined. A requirements analysis which develops projected market demand for satellite services by general and specialized carriers and an analysis of the impact of propagation and system constraints on 30/20 GHz operation are included. A set of technical performance characteristics for the 30/20 GHz systems which can serve the resulting market demand and the experimental program necessary to verify technical and operational aspects of the proposed systems is also discussed.
NASA Technical Reports Server (NTRS)
Barber, Bryan; Kahn, Laura; Wong, David
1990-01-01
Offshore operations such as oil drilling and radar monitoring require semisubmersible platforms to remain stationary at specific locations in the Gulf of Mexico. Ocean currents, wind, and waves in the Gulf of Mexico tend to move platforms away from their desired locations. A computer model was created to predict the station keeping requirements of a platform. The computer simulation uses remote sensing data from satellites and buoys as input. A background of the project, alternate approaches to the project, and the details of the simulation are presented.
ERIC Educational Resources Information Center
Cook, Kristin L.; Dinkins, Elizabeth G.
2015-01-01
Many educators support the idea that science requires a specific set of literacy skills and that all students should be equipped with those skills to become scientifically literate; however, this challenge requires science educators to develop methods to underscore the building of disciplinary literacy. In the presented curriculum for preservice…
Study on the measures to promote the use of photovoltaic power generating system overseas
NASA Astrophysics Data System (ADS)
1989-03-01
In order to understand the state of the utilizing photovoltaic power generating system, the present situation to promote its development, the actual status of the assistance for developing countries by each country or by each international organization, research was done for USA, principal western countries, UN and EC. First, development conditions of the solar cell utilizing technique were classified by each country at the standpoint of developing and promoting systems. Second, the projects and policies in each country or international organization were arranged to promote research, development and introduction. Next, the present situation of the photovoltaic power generation projects by civilian parties and the problems to assist the projects by each country were arranged. While, the present sutuation of the photovoltaic power generation projects assisted by the governments and international organizations were classified by each country and each international organizations. Finally, in view of importance in the photovoltaic power generation project, it was concluded that not only developed country governments and international organizations but also private enterprises in developed countries were required to expand the understanding about the photovoltaic power generation system.