Improvement of the cost-benefit analysis algorithm for high-rise construction projects
NASA Astrophysics Data System (ADS)
Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir
2018-03-01
The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.
Zwikael, Ofer; Ahn, Mark
2011-01-01
This article examines the effectiveness of current risk management practices to reduce project risk using a multinational, multi-industry study across different scenarios and cultures. A survey was administered to 701 project managers, and their supervisors, in seven industries and three diverse countries (New Zealand, Israel, and Japan), in multiple languages during the 2002-2007 period. Results of this study show that project context--industry and country where a project is executed--significantly impacts perceived levels of project risk, and the intensity of risk management processes. Our findings also suggest that risk management moderates the relationship between risk level and project success. Specifically, we found that even moderate levels of risk management planning are sufficient to reduce the negative effect risk levels have on project success. © 2010 Society for Risk Analysis.
Analysis of interactions among barriers in project risk management
NASA Astrophysics Data System (ADS)
Dandage, Rahul V.; Mantha, Shankar S.; Rane, Santosh B.; Bhoola, Vanita
2018-03-01
In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success of project management is oftentimes based on the understanding of barriers to effective risk management, application of appropriate risk management methodology, proactive leadership to avoid barriers, workers' attitude, adequate resources, organizational culture, and involvement of top management. This paper represents various risk categories and barriers to risk management in domestic and international projects through literature survey and feedback from project professionals. After analysing the various modelling methods used in project risk management literature, interpretive structural modelling (ISM) and MICMAC analysis have been used to analyse interactions among the barriers and prioritize them. The analysis indicates that lack of top management support, lack of formal training, and lack of addressing cultural differences are the high priority barriers, among many others.
Research on Risk Manage of Power Construction Project Based on Bayesian Network
NASA Astrophysics Data System (ADS)
Jia, Zhengyuan; Fan, Zhou; Li, Yong
With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.
Streamlining project delivery through risk analysis.
DOT National Transportation Integrated Search
2015-08-01
Project delivery is a significant area of concern and is subject to several risks throughout Plan Development : Process (PDP). These risks are attributed to major areas of project development, such as environmental : analysis, right-of-way (ROW) acqu...
Project risk management in the construction of high-rise buildings
NASA Astrophysics Data System (ADS)
Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya
2018-03-01
This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.
Application of Risk Assessment Tools in the Continuous Risk Management (CRM) Process
NASA Technical Reports Server (NTRS)
Ray, Paul S.
2002-01-01
Marshall Space Flight Center (MSFC) of the National Aeronautics and Space Administration (NASA) is currently implementing the Continuous Risk Management (CRM) Program developed by the Carnegie Mellon University and recommended by NASA as the Risk Management (RM) implementation approach. The four most frequently used risk assessment tools in the center are: (a) Failure Modes and Effects Analysis (FMEA), Hazard Analysis (HA), Fault Tree Analysis (FTA), and Probabilistic Risk Analysis (PRA). There are some guidelines for selecting the type of risk assessment tools during the project formulation phase of a project, but there is not enough guidance as to how to apply these tools in the Continuous Risk Management process (CRM). But the ways the safety and risk assessment tools are used make a significant difference in the effectiveness in the risk management function. Decisions regarding, what events are to be included in the analysis, to what level of details should the analysis be continued, make significant difference in the effectiveness of risk management program. Tools of risk analysis also depends on the phase of a project e.g. at the initial phase of a project, when not much data are available on hardware, standard FMEA cannot be applied; instead a functional FMEA may be appropriate. This study attempted to provide some directives to alleviate the difficulty in applying FTA, PRA, and FMEA in the CRM process. Hazard Analysis was not included in the scope of the study due to the short duration of the summer research project.
A review of risk management process in construction projects of developing countries
NASA Astrophysics Data System (ADS)
Bahamid, R. A.; Doh, S. I.
2017-11-01
In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.
NASA Technical Reports Server (NTRS)
Bonine, Lauren
2015-01-01
The presentation provides insight into the schedule risk analysis process used by the Stratospheric Aerosol and Gas Experiment III on the International Space Station Project. The presentation focuses on the schedule risk analysis process highlighting the methods for identification of risk inputs, the inclusion of generic risks identified outside the traditional continuous risk management process, and the development of tailored analysis products used to improve risk informed decision making.
2013-06-30
QUANTITATIVE RISK ANALYSIS The use of quantitative cost risk analysis tools can be valuable in measuring numerical risk to the government ( Galway , 2004...assessment of the EVMS itself. Galway (2004) practically linked project quantitative risk assessment to EVM by focusing on cost, schedule, and...www.amazon.com Galway , L. (2004, February). Quantitative risk analysis for project management: A critical review (RAND Working Paper WR-112-RC
Risk management of PPP project in the preparation stage based on Fault Tree Analysis
NASA Astrophysics Data System (ADS)
Xing, Yuanzhi; Guan, Qiuling
2017-03-01
The risk management of PPP(Public Private Partnership) project can improve the level of risk control between government departments and private investors, so as to make more beneficial decisions, reduce investment losses and achieve mutual benefit as well. Therefore, this paper takes the PPP project preparation stage venture as the research object to identify and confirm four types of risks. At the same time, fault tree analysis(FTA) is used to evaluate the risk factors that belong to different parts, and quantify the influencing degree of risk impact on the basis of risk identification. In addition, it determines the importance order of risk factors by calculating unit structure importance on PPP project preparation stage. The result shows that accuracy of government decision-making, rationality of private investors funds allocation and instability of market returns are the main factors to generate the shared risk on the project.
NASA Astrophysics Data System (ADS)
Sharf, I. V.; Chukhareva, N. V.; Kuznetsova, L. P.
2014-08-01
High social and economic importance of large-scale projects on gasification of East Siberian regions of Russia and diversifying gas exports poses the problem of complex risk analysis of the project. This article discusses the various types of risks that could significantly affect the timing of the implementation and effectiveness of the project for the construction of the first line of "Sila Sibiri", the "Chayanda-Lensk" section. Special attention is paid to financial and tax aspects of the project. Graphically presented analysis of the dynamics of financial indicators reflect certain periods of effectiveness in implementing the project. Authors also discuss the possible causes and consequences of risks.
NASA Astrophysics Data System (ADS)
Krechowicz, Maria
2017-10-01
Nowadays, one of the characteristic features of construction industry is an increased complexity of a growing number of projects. Almost each construction project is unique, has its project-specific purpose, its own project structural complexity, owner’s expectations, ground conditions unique to a certain location, and its own dynamics. Failure costs and costs resulting from unforeseen problems in complex construction projects are very high. Project complexity drivers pose many vulnerabilities to a successful completion of a number of projects. This paper discusses the process of effective risk management in complex construction projects in which renewable energy sources were used, on the example of the realization phase of the ENERGIS teaching-laboratory building, from the point of view of DORBUD S.A., its general contractor. This paper suggests a new approach to risk management for complex construction projects in which renewable energy sources were applied. The risk management process was divided into six stages: gathering information, identification of the top, critical project risks resulting from the project complexity, construction of the fault tree for each top, critical risks, logical analysis of the fault tree, quantitative risk assessment applying fuzzy logic and development of risk response strategy. A new methodology for the qualitative and quantitative risk assessment for top, critical risks in complex construction projects was developed. Risk assessment was carried out applying Fuzzy Fault Tree analysis on the example of one top critical risk. Application of the Fuzzy sets theory to the proposed model allowed to decrease uncertainty and eliminate problems with gaining the crisp values of the basic events probability, common during expert risk assessment with the objective to give the exact risk score of each unwanted event probability.
Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hulett, David T.; Nosbisch, Michael R.
This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost,more » and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)« less
Bayesian-network-based safety risk assessment for steel construction projects.
Leu, Sou-Sen; Chang, Ching-Miao
2013-05-01
There are four primary accident types at steel building construction (SC) projects: falls (tumbles), object falls, object collapse, and electrocution. Several systematic safety risk assessment approaches, such as fault tree analysis (FTA) and failure mode and effect criticality analysis (FMECA), have been used to evaluate safety risks at SC projects. However, these traditional methods ineffectively address dependencies among safety factors at various levels that fail to provide early warnings to prevent occupational accidents. To overcome the limitations of traditional approaches, this study addresses the development of a safety risk-assessment model for SC projects by establishing the Bayesian networks (BN) based on fault tree (FT) transformation. The BN-based safety risk-assessment model was validated against the safety inspection records of six SC building projects and nine projects in which site accidents occurred. The ranks of posterior probabilities from the BN model were highly consistent with the accidents that occurred at each project site. The model accurately provides site safety-management abilities by calculating the probabilities of safety risks and further analyzing the causes of accidents based on their relationships in BNs. In practice, based on the analysis of accident risks and significant safety factors, proper preventive safety management strategies can be established to reduce the occurrence of accidents on SC sites. Copyright © 2013 Elsevier Ltd. All rights reserved.
The use of cluster analysis techniques in spaceflight project cost risk estimation
NASA Technical Reports Server (NTRS)
Fox, G.; Ebbeler, D.; Jorgensen, E.
2003-01-01
Project cost risk is the uncertainty in final project cost, contingent on initial budget, requirements and schedule. For a proposed mission, a dynamic simulation model relying for some of its input on a simple risk elicitation is used to identify and quantify systemic cost risk.
Caous, Cristofer André; Machado, Birajara; Hors, Cora; Zeh, Andrea Kaufmann; Dias, Cleber Gustavo; Amaro Junior, Edson
2012-01-01
To propose a measure (index) of expected risks to evaluate and follow up the performance analysis of research projects involving financial and adequate structure parameters for its development. A ranking of acceptable results regarding research projects with complex variables was used as an index to gauge a project performance. In order to implement this method the ulcer index as the basic model to accommodate the following variables was applied: costs, high impact publication, fund raising, and patent registry. The proposed structured analysis, named here as RoSI (Return on Scientific Investment) comprises a pipeline of analysis to characterize the risk based on a modeling tool that comprises multiple variables interacting in semi-quantitatively environments. This method was tested with data from three different projects in our Institution (projects A, B and C). Different curves reflected the ulcer indexes identifying the project that may have a minor risk (project C) related to development and expected results according to initial or full investment. The results showed that this model contributes significantly to the analysis of risk and planning as well as to the definition of necessary investments that consider contingency actions with benefits to the different stakeholders: the investor or donor, the project manager and the researchers.
2013-06-01
measuring numerical risk to the government ( Galway , 2004). However, quantitative risk analysis is rarely utilized in DoD acquisition programs because the...quantitative assessment of the EVMS itself. Galway (2004) practically linked project quantitative risk assessment to EVM by focusing on cost...Kindle version]. Retrieved from Amazon.com 83 Galway , L. (2004, February). Quantitative risk analysis for project management: A critical review
Risk evaluation of highway engineering project based on the fuzzy-AHP
NASA Astrophysics Data System (ADS)
Yang, Qian; Wei, Yajun
2011-10-01
Engineering projects are social activities, which integrate with technology, economy, management and organization. There are uncertainties in each respect of engineering projects, and it needs to strengthen risk management urgently. Based on the analysis of the characteristics of highway engineering, and the study of the basic theory on risk evaluation, the paper built an index system of highway project risk evaluation. Besides based on fuzzy mathematics principle, analytical hierarchy process was used and as a result, the model of the comprehensive appraisal method of fuzzy and AHP was set up for the risk evaluation of express way concessionary project. The validity and the practicability of the risk evaluation of expressway concessionary project were verified after the model was applied to the practice of a project.
Quantitative risk management in gas injection project: a case study from Oman oil and gas industry
NASA Astrophysics Data System (ADS)
Khadem, Mohammad Miftaur Rahman Khan; Piya, Sujan; Shamsuzzoha, Ahm
2017-09-01
The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interviews. These data were then translated into numerical values based on the expert's opinion. Further, the numerical data were used as an input to Monte Carlo simulation. RiskyProject Professional™ software was used to simulate the system based on the identified risks. The simulation result predicted a delay of about 2 years as a worse case with no chance of meeting the project's on stream date. Also, it has predicted 8% chance of exceeding the total estimated budget. The result of numerical analysis from the proposed model is validated by comparing it with the result of qualitative analysis, which was obtained through discussion with various project managers of company.
Risk and value analysis of SETI
NASA Technical Reports Server (NTRS)
Billingham, J.
1986-01-01
The risks, values, and costs of the SETI project are evaluated and compared with those of the Viking project. Examination of the scientific values, side benefits, and costs of the two projects reveal that both projects provide equal benefits at equal costs. The probability of scientific and technical success is analyzed.
Cost Risk Analysis Based on Perception of the Engineering Process
NASA Technical Reports Server (NTRS)
Dean, Edwin B.; Wood, Darrell A.; Moore, Arlene A.; Bogart, Edward H.
1986-01-01
In most cost estimating applications at the NASA Langley Research Center (LaRC), it is desirable to present predicted cost as a range of possible costs rather than a single predicted cost. A cost risk analysis generates a range of cost for a project and assigns a probability level to each cost value in the range. Constructing a cost risk curve requires a good estimate of the expected cost of a project. It must also include a good estimate of expected variance of the cost. Many cost risk analyses are based upon an expert's knowledge of the cost of similar projects in the past. In a common scenario, a manager or engineer, asked to estimate the cost of a project in his area of expertise, will gather historical cost data from a similar completed project. The cost of the completed project is adjusted using the perceived technical and economic differences between the two projects. This allows errors from at least three sources. The historical cost data may be in error by some unknown amount. The managers' evaluation of the new project and its similarity to the old project may be in error. The factors used to adjust the cost of the old project may not correctly reflect the differences. Some risk analyses are based on untested hypotheses about the form of the statistical distribution that underlies the distribution of possible cost. The usual problem is not just to come up with an estimate of the cost of a project, but to predict the range of values into which the cost may fall and with what level of confidence the prediction is made. Risk analysis techniques that assume the shape of the underlying cost distribution and derive the risk curve from a single estimate plus and minus some amount usually fail to take into account the actual magnitude of the uncertainty in cost due to technical factors in the project itself. This paper addresses a cost risk method that is based on parametric estimates of the technical factors involved in the project being costed. The engineering process parameters are elicited from the engineer/expert on the project and are based on that expert's technical knowledge. These are converted by a parametric cost model into a cost estimate. The method discussed makes no assumptions about the distribution underlying the distribution of possible costs, and is not tied to the analysis of previous projects, except through the expert calibrations performed by the parametric cost analyst.
Case Study on Project Risk Management Planning Based on Soft System Methodology
NASA Astrophysics Data System (ADS)
Lifang, Xie; Jun, Li
This paper analyzed the soft system characters of construction projects and the applicability on using Soft System Methodology (SSM) for risk analysis after a brief review of SSM. Taking a hydropower project as an example, it constructed the general frame of project risk management planning (PRMP) and established the Risk Management Planning (RMP) system from the perspective of the interests of co-ordination. This paper provided the ideas and methods for construction RMP under the win-win situation through the practice of SSM.
The ARGO Project: assessing NA-TECH risks on off-shore oil platforms
NASA Astrophysics Data System (ADS)
Capuano, Paolo; Basco, Anna; Di Ruocco, Angela; Esposito, Simona; Fusco, Giannetta; Garcia-Aristizabal, Alexander; Mercogliano, Paola; Salzano, Ernesto; Solaro, Giuseppe; Teofilo, Gianvito; Scandone, Paolo; Gasparini, Paolo
2017-04-01
ARGO (Analysis of natural and anthropogenic risks on off-shore oil platforms) is a 2 years project, funded by the DGS-UNMIG (Directorate General for Safety of Mining and Energy Activities - National Mining Office for Hydrocarbons and Georesources) of Italian Ministry of Economic Development. The project, coordinated by AMRA (Center for the Analysis and Monitoring of Environmental Risk), aims at providing technical support for the analysis of natural and anthropogenic risks on offshore oil platforms. In order to achieve this challenging objective, ARGO brings together climate experts, risk management experts, seismologists, geologists, chemical engineers, earth and coastal observation experts. ARGO has developed methodologies for the probabilistic analysis of industrial accidents triggered by natural events (NA-TECH) on offshore oil platforms in the Italian seas, including extreme events related to climate changes. Furthermore the environmental effect of offshore activities has been investigated, including: changes on seismicity and on the evolution of coastal areas close to offshore platforms. Then a probabilistic multi-risk framework has been developed for the analysis of NA-TECH events on offshore installations for hydrocarbon extraction.
Private participation in infrastructure: A risk analysis of long-term contracts in power sector
NASA Astrophysics Data System (ADS)
Ceran, Nisangul
The objective of this dissertation is to assess whether the private participation in energy sector through long term contracting, such as Build-Operate-Transfer (BOT) type investments, is an efficient way of promoting efficiency in the economy. To this end; the theoretical literature on the issue is discussed, the experience of several developing countries are examined, and a BOT project, which is undertaken by the Enron company in Turkey, has been studied in depth as a case study. Different risk analysis techniques, including sensitivity and probabilistic risk analysis with the Monte Carlo Simulation (MCS) method have been applied to assess the financial feasibility and risks of the case study project, and to shed light on the level of rent-seeking in the BOT agreements. Although data on rent seeking and corruption is difficult to obtain, the analysis of case study investment using the sensitivity and MCS method provided some information that can be used in assessing the level of rent-seeking in BOT projects. The risk analysis enabled to test the sustainability of the long-term BOT contracts through the analysis of projects financial feasibility with and without the government guarantees in the project. The approach of testing the sustainability of the project under different scenarios is helpful to understand the potential costs and contingent liabilities for the government and project's impact on a country's overall economy. The results of the risk analysis made by the MCS method for the BOT project used as the case study strongly suggest that, the BOT projects does not serve to the interest of the society and transfers substantial amount of public money to the private companies, implying severe governance problems. It is found that not only government but also private sector may be reluctant about full privatization of infrastructure due to several factors such as involvement of large sunk costs, very long time period for returns to be received, political and macroeconomic uncertainties and insufficient institutional and regulatory environment. It is concluded that the BOT type infrastructure projects are not an efficient way of promoting private sector participation in infrastructure. They tend to serve the interest of rent-seekers rather than the interest of the society. Since concession contracts and Treasury guarantees shift the commercial risk to government, the private sector has no incentive to be efficient. The concession agreements distort the market conditions by preventing free completion in the market.
Development of Risk Uncertainty Factors from Historical NASA Projects
NASA Technical Reports Server (NTRS)
Amer, Tahani R.
2011-01-01
NASA is a good investment of federal funds and strives to provide the best value to the nation. NASA has consistently budgeted to unrealistic cost estimates, which are evident in the cost growth in many of its programs. In this investigation, NASA has been using available uncertainty factors from the Aerospace Corporation, Air Force, and Booz Allen Hamilton to develop projects risk posture. NASA has no insight into the developmental of these factors and, as demonstrated here, this can lead to unrealistic risks in many NASA Programs and projects (P/p). The primary contribution of this project is the development of NASA missions uncertainty factors, from actual historical NASA projects, to aid cost-estimating as well as for independent reviews which provide NASA senior management with information and analysis to determine the appropriate decision regarding P/p. In general terms, this research project advances programmatic analysis for NASA projects.
Success in health information exchange projects: solving the implementation puzzle.
Sicotte, Claude; Paré, Guy
2010-04-01
Interest in health information exchange (HIE), defined as the use of information technology to support the electronic transfer of clinical information across health care organizations, continues to grow among those pursuing greater patient safety and health care accessibility and efficiency. In this paper, we present the results of a longitudinal multiple-case study of two large-scale HIE implementation projects carried out in real time over 3-year and 2-year periods in Québec, Canada. Data were primarily collected through semi-structured interviews (n=52) with key informants, namely implementation team members and targeted users. These were supplemented with non-participants observation of team meetings and by the analysis of organizational documents. The cross-case comparison was particularly relevant given that project circumstances led to contrasting outcomes: while one project failed, the other was a success. A risk management analysis was performed taking a process view in order to capture the complexity of project implementations as evolving phenomena that are affected by interdependent pre-existing and emergent risks that tend to change over time. The longitudinal case analysis clearly demonstrates that the risk factors were closely intertwined. Systematic ripple effects from one risk factor to another were observed. This risk interdependence evolved dynamically over time, with a snowball effect that rendered a change of path progressively more difficult as time passed. The results of the cross-case analysis demonstrate a direct relationship between the quality of an implementation strategy and project outcomes. Copyright 2010 Elsevier Ltd. All rights reserved.
Risk analysis for renewable energy projects due to constraints arising
NASA Astrophysics Data System (ADS)
Prostean, G.; Vasar, C.; Prostean, O.; Vartosu, A.
2016-02-01
Starting from the target of the European Union (EU) to use renewable energy in the area that aims a binding target of 20% renewable energy in final energy consumption by 2020, this article illustrates the identification of risks for implementation of wind energy projects in Romania, which could lead to complex technical implications, social and administrative. In specific projects analyzed in this paper were identified critical bottlenecks in the future wind power supply chain and reasonable time periods that may arise. Renewable energy technologies have to face a number of constraints that delayed scaling-up their production process, their transport process, the equipment reliability, etc. so implementing these types of projects requiring complex specialized team, the coordination of which also involve specific risks. The research team applied an analytical risk approach to identify major risks encountered within a wind farm project developed in Romania in isolated regions with different particularities, configured for different geographical areas (hill and mountain locations in Romania). Identification of major risks was based on the conceptual model set up for the entire project implementation process. Throughout this conceptual model there were identified specific constraints of such process. Integration risks were examined by an empirical study based on the method HAZOP (Hazard and Operability). The discussion describes the analysis of our results implementation context of renewable energy projects in Romania and creates a framework for assessing energy supply to any entity from renewable sources.
Risk Management for Human Support Technology Development
NASA Technical Reports Server (NTRS)
jones, Harry
2005-01-01
NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.
Risk-benefit analysis and public policy: a bibliography
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clark, E.M.; Van Horn, A.J.
1976-11-01
Risk-benefit analysis has been implicitly practiced whenever decision-makers are confronted with decisions involving risks to life, health, or to the environment. Various methodologies have been developed to evaluate relevant criteria and to aid in assessing the impacts of alternative projects. Among these have been cost-benefit analysis, which has been widely used for project evaluation. However, in many cases it has been difficult to assign dollar costs to those criteria involving risks and benefits which are not now assigned explicit monetary values in our economic system. Hence, risk-benefit analysis has evolved to become more than merely an extension of cost-benefit analysis,more » and many methods have been applied to examine the trade-offs between risks and benefits. In addition, new scientific and statistical techniques have been developed for assessing current and future risks. The 950 references included in this bibliography are meant to suggest the breadth of those methodologies which have been applied to decisions involving risk.« less
NASA Astrophysics Data System (ADS)
Low, W. W.; Wong, K. S.; Lee, J. L.
2018-04-01
With the growth of economy and population, there is an increase in infrastructure construction projects. As such, it is unavoidable to have construction projects on soft soil. Without proper risk management plan, construction projects are vulnerable to different types of risks which will have negative impact on project’s time, cost and quality. Literature review showed that little or none of the research is focused on the risk assessment on the infrastructure project in soft soil. Hence, the aim of this research is to propose a risk assessment framework in infrastructure projects in soft soil during the construction stage. This research was focused on the impact of risks on project time and internal risk factors. The research method was Analytical Hierarchy Process and the sample population was experienced industry experts who have experience in infrastructure projects. Analysis was completed and result showed that for internal factors, the five most significant risks on time element are lack of special equipment, potential contractual disputes and claims, shortage of skilled workers, delay/lack of materials supply, and insolvency of contractor/sub-contractor. Results indicated that resources risk factor play a critical role on project time frame in infrastructure projects in soft soil during the construction stage.
ERIC Educational Resources Information Center
Okongo, James
2014-01-01
The failure rate of information technology (IT) development projects is a significant concern for today's organizations. Perceptions of IT project risk and project performance have been identified as important factors by scholars studying the topic, and Wallace, Keil, and Rai (2004a) developed a survey instrument to measure how dimensions of…
An Analysis of Department of Energy Cost Proposal Process and Effectiveness
2011-10-11
processes to mitigate and manage risk , rather than derive upfront assessment and quantification of proposal risk (DoE, 2008a). The proposal...2. GM 2- Enhance the Federal Contract and Project Management Workforce Substantially Complete 3. GM 3 - Improve Project Risk Assessment ...proposal, contract proposal evaluation, risk , cost analysis = = ^Åèìáëáíáçå=oÉëÉ~êÅÜ=mêçÖê~ã= do^ar^qb=p`elli=lc=_rpfkbpp=C=mr_if`=mlif`v - ii
Continuous Risk Management at NASA
NASA Technical Reports Server (NTRS)
Hammer, Theodore F.; Rosenberg, Linda
1999-01-01
NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions. This risk management structure of functions has been taught to projects at all NASA Centers and is being successfully implemented on many projects. This presentation will give project managers the information they need to understand if risk management is to be effectively implemented on their projects at a cost they can afford.
Teresa E. Jordan
2015-11-15
This collection of files are part of a larger dataset uploaded in support of Low Temperature Geothermal Play Fairway Analysis for the Appalachian Basin (GPFA-AB, DOE Project DE-EE0006726). Phase 1 of the GPFA-AB project identified potential Geothermal Play Fairways within the Appalachian basin of Pennsylvania, West Virginia and New York. This was accomplished through analysis of 4 key criteria or ‘risks’: thermal quality, natural reservoir productivity, risk of seismicity, and heat utilization. Each of these analyses represent a distinct project task, with the fifth task encompassing combination of the 4 risks factors. Supporting data for all five tasks has been uploaded into the Geothermal Data Repository node of the National Geothermal Data System (NGDS). This submission comprises the data for Thermal Quality Analysis (project task 1) and includes all of the necessary shapefiles, rasters, datasets, code, and references to code repositories that were used to create the thermal resource and risk factor maps as part of the GPFA-AB project. The identified Geothermal Play Fairways are also provided with the larger dataset. Figures (.png) are provided as examples of the shapefiles and rasters. The regional standardized 1 square km grid used in the project is also provided as points (cell centers), polygons, and as a raster. Two ArcGIS toolboxes are available: 1) RegionalGridModels.tbx for creating resource and risk factor maps on the standardized grid, and 2) ThermalRiskFactorModels.tbx for use in making the thermal resource maps and cross sections. These toolboxes contain “item description” documentation for each model within the toolbox, and for the toolbox itself. This submission also contains three R scripts: 1) AddNewSeisFields.R to add seismic risk data to attribute tables of seismic risk, 2) StratifiedKrigingInterpolation.R for the interpolations used in the thermal resource analysis, and 3) LeaveOneOutCrossValidation.R for the cross validations used in the thermal interpolations. Some file descriptions make reference to various 'memos'. These are contained within the final report submitted October 16, 2015. Each zipped file in the submission contains an 'about' document describing the full Thermal Quality Analysis content available, along with key sources, authors, citation, use guidelines, and assumptions, with the specific file(s) contained within the .zip file highlighted.
Introducing Risk Management Techniques Within Project Based Software Engineering Courses
NASA Astrophysics Data System (ADS)
Port, Daniel; Boehm, Barry
2002-03-01
In 1996, USC switched its core two-semester software engineering course from a hypothetical-project, homework-and-exam course based on the Bloom taxonomy of educational objectives (knowledge, comprehension, application, analysis, synthesis, and evaluation). The revised course is a real-client team-project course based on the CRESST model of learning objectives (content understanding, problem solving, collaboration, communication, and self-regulation). We used the CRESST cognitive demands analysis to determine the necessary student skills required for software risk management and the other major project activities, and have been refining the approach over the last 5 years of experience, including revised versions for one-semester undergraduate and graduate project course at Columbia. This paper summarizes our experiences in evolving the risk management aspects of the project course. These have helped us mature more general techniques such as risk-driven specifications, domain-specific simplifier and complicator lists, and the schedule as an independent variable (SAIV) process model. The largely positive results in terms of review of pass / fail rates, client evaluations, product adoption rates, and hiring manager feedback are summarized as well.
Disasters as a necessary part of benefit-cost analyses.
Mark, R K; Stuart-Alexander, D E
1977-09-16
Benefit-cost analyses for water projects generally have not included the expected costs (residual risk) of low-probability disasters such as dam failures, impoundment-induced earthquakes, and landslides. Analysis of the history of these types of events demonstrates that dam failures are not uncommon and that the probability of a reservoir-triggered earth-quake increases with increasing reservoir depth. Because the expected costs from such events can be significant and risk is project-specific, estimates should be made for each project. The cost of expected damage from a "high-risk" project in an urban area could be comparable to project benefits.
NASA Technical Reports Server (NTRS)
Cucinotta, Francis; Badhwar, Gautam; Saganti, Premkumar; Schimmerling, Walter; Wilson, John; Peterson, Leif; Dicello, John
2002-01-01
In this paper we discuss expected lifetime excess cancer risks for astronauts returning from exploration class missions. For the first time we make a quantitative assessment of uncertainties in cancer risk projections for space radiation exposures. Late effects from the high charge and energy (HZE) ions present in the galactic cosmic rays including cancer and the poorly understood risks to the central nervous system constitute the major risks. Methods used to project risk in low Earth orbit are seen as highly uncertain for projecting risks on exploration missions because of the limited radiobiology data available for estimating HZE ion risks. Cancer risk projections are described as a product of many biological and physical factors, each of which has a differential range of uncertainty due to lack of data and knowledge. Monte-Carlo sampling from subjective error distributions represents the lack of knowledge in each factor to quantify risk projection overall uncertainty. Cancer risk analysis is applied to several exploration mission scenarios. At solar minimum, the number of days in space where career risk of less than the limiting 3% excess cancer mortality can be assured at a 95% confidence level is found to be only of the order of 100 days.
Adoption of Building Information Modelling in project planning risk management
NASA Astrophysics Data System (ADS)
Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.
2017-11-01
An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.
BBN-Based Portfolio Risk Assessment for NASA Technology R&D Outcome
NASA Technical Reports Server (NTRS)
Geuther, Steven C.; Shih, Ann T.
2016-01-01
The NASA Aeronautics Research Mission Directorate (ARMD) vision falls into six strategic thrusts that are aimed to support the challenges of the Next Generation Air Transportation System (NextGen). In order to achieve the goals of the ARMD vision, the Airspace Operations and Safety Program (AOSP) is committed to developing and delivering new technologies. To meet the dual challenges of constrained resources and timely technology delivery, program portfolio risk assessment is critical for communication and decision-making. This paper describes how Bayesian Belief Network (BBN) is applied to assess the probability of a technology meeting the expected outcome. The network takes into account the different risk factors of technology development and implementation phases. The use of BBNs allows for all technologies of projects in a program portfolio to be separately examined and compared. In addition, the technology interaction effects are modeled through the application of object-oriented BBNs. The paper discusses the development of simplified project risk BBNs and presents various risk results. The results presented include the probability of project risks not meeting success criteria, the risk drivers under uncertainty via sensitivity analysis, and what-if analysis. Finally, the paper shows how program portfolio risk can be assessed using risk results from BBNs of projects in the portfolio.
Applications of Earth Observations for Fisheries Management: An analysis of socioeconomic benefits
NASA Astrophysics Data System (ADS)
Friedl, L.; Kiefer, D. A.; Turner, W.
2013-12-01
This paper will discuss the socioeconomic impacts of a project applying Earth observations and models to support management and conservation of tuna and other marine resources in the eastern Pacific Ocean. A project team created a software package that produces statistical analyses and dynamic maps of habitat for pelagic ocean biota. The tool integrates sea surface temperature and chlorophyll imagery from MODIS, ocean circulation models, and other data products. The project worked with the Inter-American Tropical Tuna Commission, which issues fishery management information, such as stock assessments, for the eastern Pacific region. The Commission uses the tool and broader habitat information to produce better estimates of stock and thus improve their ability to identify species that could be at risk of overfishing. The socioeconomic analysis quantified the relative value that Earth observations contributed to accurate stock size assessments through improvements in calculating population size. The analysis team calculated the first-order economic costs of a fishery collapse (or shutdown), and they calculated the benefits of improved estimates that reduce the uncertainty of stock size and thus reduce the risk of fishery collapse. The team estimated that the project reduced the probability of collapse of different fisheries, and the analysis generated net present values of risk mitigation. USC led the project with sponsorship from the NASA Earth Science Division's Applied Sciences Program, which conducted the socioeconomic impact analysis. The paper will discuss the project and focus primarily on the analytic methods, impact metrics, and the results of the socioeconomic benefits analysis.
Development of Improved Caprock Integrity and Risk Assessment Techniques
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bruno, Michael
GeoMechanics Technologies has completed a geomechanical caprock integrity analysis and risk assessment study funded through the US Department of Energy. The project included: a detailed review of historical caprock integrity problems experienced in the natural gas storage industry; a theoretical description and documentation of caprock integrity issues; advanced coupled transport flow modelling and geomechanical simulation of three large-scale potential geologic sequestration sites to estimate geomechanical effects from CO₂ injection; development of a quantitative risk and decision analysis tool to assess caprock integrity risks; and, ultimately the development of recommendations and guidelines for caprock characterization and CO₂ injection operating practices. Historicalmore » data from gas storage operations and CO₂ sequestration projects suggest that leakage and containment incident risks are on the order of 10-1 to 10-2, which is higher risk than some previous studies have suggested for CO₂. Geomechanical analysis, as described herein, can be applied to quantify risks and to provide operating guidelines to reduce risks. The risk assessment tool developed for this project has been applied to five areas: The Wilmington Graben offshore Southern California, Kevin Dome in Montana, the Louden Field in Illinois, the Sleipner CO₂ sequestration operation in the North Sea, and the In Salah CO₂ sequestration operation in North Africa. Of these five, the Wilmington Graben area represents the highest relative risk while the Kevin Dome area represents the lowest relative risk.« less
DOT National Transportation Integrated Search
1979-08-01
The report is part of a study to update the historical and projected cost/revenue analysis of the U.S. domestic automobile manufacturers. It includes the evaluation of the historical and projected financial data to assess the corporate financial posi...
Muis, Sanne; Güneralp, Burak; Jongman, Brenden; Aerts, Jeroen C J H; Ward, Philip J
2015-12-15
An accurate understanding of flood risk and its drivers is crucial for effective risk management. Detailed risk projections, including uncertainties, are however rarely available, particularly in developing countries. This paper presents a method that integrates recent advances in global-scale modeling of flood hazard and land change, which enables the probabilistic analysis of future trends in national-scale flood risk. We demonstrate its application to Indonesia. We develop 1000 spatially-explicit projections of urban expansion from 2000 to 2030 that account for uncertainty associated with population and economic growth projections, as well as uncertainty in where urban land change may occur. The projections show that the urban extent increases by 215%-357% (5th and 95th percentiles). Urban expansion is particularly rapid on Java, which accounts for 79% of the national increase. From 2000 to 2030, increases in exposure will elevate flood risk by, on average, 76% and 120% for river and coastal floods. While sea level rise will further increase the exposure-induced trend by 19%-37%, the response of river floods to climate change is highly uncertain. However, as urban expansion is the main driver of future risk, the implementation of adaptation measures is increasingly urgent, regardless of the wide uncertainty in climate projections. Using probabilistic urban projections, we show that spatial planning can be a very effective adaptation strategy. Our study emphasizes that global data can be used successfully for probabilistic risk assessment in data-scarce countries. Copyright © 2015 Elsevier B.V. All rights reserved.
Spatiotemporal analysis of the agricultural drought risk in Heilongjiang Province, China
NASA Astrophysics Data System (ADS)
Pei, Wei; Fu, Qiang; Liu, Dong; Li, Tian-xiao; Cheng, Kun; Cui, Song
2017-06-01
Droughts are natural disasters that pose significant threats to agricultural production as well as living conditions, and a spatial-temporal difference analysis of agricultural drought risk can help determine the spatial distribution and temporal variation of the drought risk within a region. Moreover, this type of analysis can provide a theoretical basis for the identification, prevention, and mitigation of drought disasters. In this study, the overall dispersion and local aggregation of projection points were based on research by Friedman and Tukey (IEEE Trans on Computer 23:881-890, 1974). In this work, high-dimensional samples were clustered by cluster analysis. The clustering results were represented by the clustering matrix, which determined the local density in the projection index. This method avoids the problem of determining a cutoff radius. An improved projection pursuit model is proposed that combines cluster analysis and the projection pursuit model, which offer advantages for classification and assessment, respectively. The improved model was applied to analyze the agricultural drought risk of 13 cities in Heilongjiang Province over 6 years (2004, 2006, 2008, 2010, 2012, and 2014). The risk of an agricultural drought disaster was characterized by 14 indicators and the following four aspects: hazard, exposure, sensitivity, and resistance capacity. The spatial distribution and temporal variation characteristics of the agricultural drought risk in Heilongjiang Province were analyzed. The spatial distribution results indicated that Suihua, Qigihar, Daqing, Harbin, and Jiamusi are located in high-risk areas, Daxing'anling and Yichun are located in low-risk areas, and the differences among the regions were primarily caused by the aspects exposure and resistance capacity. The temporal variation results indicated that the risk of agricultural drought in most areas presented an initially increasing and then decreasing trend. A higher value for the exposure aspect increased the risk of drought, whereas a higher value for the resistance capacity aspect reduced the risk of drought. Over the long term, the exposure level of the region presented limited increases, whereas the resistance capacity presented considerable increases. Therefore, the risk of agricultural drought in Heilongjiang Province will continue to exhibit a decreasing trend.
Malicki, Julian; Bly, Ritva; Bulot, Mireille; Godet, Jean-Luc; Jahnen, Andreas; Krengli, Marco; Maingon, Philippe; Prieto Martin, Carlos; Skrobala, Agnieszka; Valero, Marc; Jarvinen, Hannu
2018-05-02
The ACCIRAD project, commissioned by the European Commission (EC) to develop guidelines for risk analysis of accidental and unintended exposures in external beam radiotherapy (EBRT), was completed in the year 2014. In 2015, the "General guidelines on risk management in external beam radiotherapy" were published as EC report Radiation Protection (RP)-181. The present document is the third and final report of the findings from the ACCIRAD project. The main aim of this paper is to describe the key features of the risk management process and to provide general guidelines for radiotherapy departments and national authorities on risk assessment and analysis of adverse error-events and near misses. The recommendations provided here and in EC report RP-181 are aimed at promoting the harmonisation of risk management systems across Europe, improving patient safety, and enabling more reliable inter-country comparisons. Copyright © 2018 Elsevier B.V. All rights reserved.
NASA Astrophysics Data System (ADS)
Ho, Long-Phi; Chau, Nguyen-Xuan-Quang; Nguyen, Hong-Quan
2013-04-01
The Nhieu Loc - Thi Nghe basin is the most important administrative and business area of Ho Chi Minh City. Due to system complexity of the basin such as the increasing trend of rainfall intensity, (tidal) water level and land subsidence, the simulation of hydrological, hydraulic variables for flooding prediction seems rather not adequate in practical projects. The basin is still highly vulnerable despite of multi-million USD investment for urban drainage improvement projects since the last decade. In this paper, an integrated system analysis in both spatial and temporal aspects based on statistical, GIS and modelling approaches has been conducted in order to: (1) Analyse risks before and after projects, (2) Foresee water-related risk under uncertainties of unfavourable driving factors and (3) Develop a sustainable flood risk management strategy for the basin. The results show that given the framework of risk analysis and adaptive strategy, certain urban developing plans in the basin must be carefully revised and/or checked in order to reduce the highly unexpected loss in the future
NASA Astrophysics Data System (ADS)
Zeng, Yajun; Skibniewski, Miroslaw J.
2013-08-01
Enterprise resource planning (ERP) system implementations are often characterised with large capital outlay, long implementation duration, and high risk of failure. In order to avoid ERP implementation failure and realise the benefits of the system, sound risk management is the key. This paper proposes a probabilistic risk assessment approach for ERP system implementation projects based on fault tree analysis, which models the relationship between ERP system components and specific risk factors. Unlike traditional risk management approaches that have been mostly focused on meeting project budget and schedule objectives, the proposed approach intends to address the risks that may cause ERP system usage failure. The approach can be used to identify the root causes of ERP system implementation usage failure and quantify the impact of critical component failures or critical risk events in the implementation process.
NASA Astrophysics Data System (ADS)
Sari, Diana Puspita; Pujotomo, Darminto; Wardani, Nadira Kusuma
2017-11-01
The Determination of risk is an uncertain event. Risks can have negative or positive impacts on project objectives. A project was defined as a series of activities and tasks that have a purpose, specifications, and limits of cost. Banyumanik Hospital Development Project is one of the construction projects in Semarang which have experienced some problems. The first problem is project delays on building stake. The second problem is delay of material supply. Finally, the problem that occurs is less management attention to health safety as evidenced by the unavailability of PPE for the workers. These problems will pose a risk to be a very important risk management performed by contractors at the Banyumanik Hospital Development Project to reduce the impact that would be caused by the risk borne by the provider of construction services. This research aim to risk identification, risk assessment and risk mitigation. Project risk management begins with the identification of risks based on the project life cycle. The risk assessment carried out by AS I NZS 4360: 2004 to the impacts of cost, time and quality. The results obtained from the method of AS I NZS 4360: 2004 is the risk that requires the handling of mitigation. Mitigated risk is the risk that had significant and high level. There are four risks that require risk mitigation with Bow-Tie diagrams which is work accidents, contract delays, material delays and design changes. Bow-Tie diagram method is a method for identifying causal and preventive action and recovery of a risk. Results obtained from Bow-Tie diagram method is a preventive action and recovery. This action is used as input to the ALARP method. ALARP method is used to determine the priority of the strategy proposed in the category broadly acceptable, tolerable, and unacceptable.
A systematic risk management approach employed on the CloudSat project
NASA Technical Reports Server (NTRS)
Basilio, R. R.; Plourde, K. S.; Lam, T.
2000-01-01
The CloudSat Project has developed a simplified approach for fault tree analysis and probabilistic risk assessment. A system-level fault tree has been constructed to identify credible fault scenarios and failure modes leading up to a potential failure to meet the nominal mission success criteria.
Cost Estimation and Control for Flight Systems
NASA Technical Reports Server (NTRS)
Hammond, Walter E.; Vanhook, Michael E. (Technical Monitor)
2002-01-01
Good program management practices, cost analysis, cost estimation, and cost control for aerospace flight systems are interrelated and depend upon each other. The best cost control process cannot overcome poor design or poor systems trades that lead to the wrong approach. The project needs robust Technical, Schedule, Cost, Risk, and Cost Risk practices before it can incorporate adequate Cost Control. Cost analysis both precedes and follows cost estimation -- the two are closely coupled with each other and with Risk analysis. Parametric cost estimating relationships and computerized models are most often used. NASA has learned some valuable lessons in controlling cost problems, and recommends use of a summary Project Manager's checklist as shown here.
NASA Astrophysics Data System (ADS)
Purwanggono, Bambang; Margarette, Anastasia
2017-12-01
Completion time of highway construction is very meaningful for smooth transportation, moreover expected number of ownership motor vehicle will increase each year. Therefore, this study was conducted with to analyze the constraints that contained in an infrastructure development project. This research was conducted on Jatingaleh Underpass Project, Semarang. This research was carried out while the project is running, on the implementation, this project is experiencing delays. This research is done to find out what are the constraints that occur in execution of a road infrastructure project, in particular that causes delays. The method that used to find the root cause is fishbone diagram to obtain a possible means of mitigation. Coupled with the RFMEA method used to determine the critical risks that must be addressed immediately on road infrastructure project. The result of data tabulation in this study indicates that the most possible mitigation tool to make a Standard Operating Procedure (SOP) recommendations to disrupt utilities that interfere project implementation. Process of risk assessment has been carried out systematically based on ISO 31000:2009 on risk management and for determination of delayed variables, the requirements of process groups according to ISO 21500:2013 on project management were used.
USDA-ARS?s Scientific Manuscript database
Proper spatial and temporal treatments of climate change scenarios projected by General Circulation Models (GCMs) are critical to accurate assessment of climatic impacts on natural resources and ecosystems. For accurate prediction of soil erosion risk at a particular farm or field under climate cha...
Application of multi-criteria decision-making to risk prioritisation in tidal energy developments
NASA Astrophysics Data System (ADS)
Kolios, Athanasios; Read, George; Ioannou, Anastasia
2016-01-01
This paper presents an analytical multi-criterion analysis for the prioritisation of risks for the development of tidal energy projects. After a basic identification of risks throughout the project and relevant stakeholders in the UK, classified through a political, economic, social, technological, legal and environmental analysis, relevant questionnaires provided scores to each risk and corresponding weights for each of the different sectors. Employing an extended technique for order of preference by similarity to ideal solution as well as the weighted sum method based on the data obtained, the risks identified are ranked based on their criticality, drawing attention of the industry in mitigating the ones scoring higher. Both methods were modified to take averages at different stages of the analysis in order to observe the effects on the final risk ranking. A sensitivity analysis of the results was also carried out with regard to the weighting factors given to the perceived expertise of participants, with different results being obtained whether a linear, squared or square root regression is used. Results of the study show that academics and industry have conflicting opinions with regard to the perception of the most critical risks.
Risk Management in Construction Project: Taking Fairness into Account
NASA Astrophysics Data System (ADS)
Górecki, Jarosław; Bizon-Górecka, Jadwiga
2017-10-01
Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises towards a problem of the fair behaviour. These behaviours, relating to individual stakeholders, have been underlined in different phases of the construction projects’ life cycle.
Energy Technology and Market Risk Reduction | Integrated Energy Solutions |
Leveraging our market and project development expertise, NREL offers a broad range of advisory services to policy and regulatory analysis, financing alternatives, project management, proposal reviews, and project , solar permitting standards, and more. Project Financing Alternatives We can help your organization
Weather Augmented Risk Determination (WARD) System
NASA Astrophysics Data System (ADS)
Niknejad, M.; Mazdiyasni, O.; Momtaz, F.; AghaKouchak, A.
2017-12-01
Extreme climatic events have direct and indirect impacts on society, economy and the environment. Based on the United States Bureau of Economic Analysis (BEA) data, over one third of the U.S. GDP can be considered as weather-sensitive involving some degree of weather risk. This expands from a local scale concrete foundation construction to large scale transportation systems. Extreme and unexpected weather conditions have always been considered as one of the probable risks to human health, productivity and activities. The construction industry is a large sector of the economy, and is also greatly influenced by weather-related risks including work stoppage and low labor productivity. Identification and quantification of these risks, and providing mitigation of their effects are always the concerns of construction project managers. In addition to severe weather conditions' destructive effects, seasonal changes in weather conditions can also have negative impacts on human health. Work stoppage and reduced labor productivity can be caused by precipitation, wind, temperature, relative humidity and other weather conditions. Historical and project-specific weather information can improve better project management and mitigation planning, and ultimately reduce the risk of weather-related conditions. This paper proposes new software for project-specific user-defined data analysis that offers (a) probability of work stoppage and the estimated project length considering weather conditions; (b) information on reduced labor productivity and its impacts on project duration; and (c) probabilistic information on the project timeline based on both weather-related work stoppage and labor productivity. The software (WARD System) is designed such that it can be integrated into the already available project management tools. While the system and presented application focuses on the construction industry, the developed software is general and can be used for any application that involves labor productivity (e.g., farming) and work stoppage due to weather conditions (e.g., transportation, agriculture industry).
Ares Project Technology Assessment: Approach and Tools
NASA Technical Reports Server (NTRS)
Hueter, Uwe; Tyson, Richard
2010-01-01
Technology assessments provide a status of the development maturity of specific technologies. Along with benefit analysis, the risks the project assumes can be quantified. Normally due to budget constraints, the competing technologies are prioritized and decisions are made which ones to fund. A detailed technology development plan is produced for the selected technologies to provide a roadmap to reach the desired maturity by the project s critical design review. Technology assessments can be conducted for both technology only tasks or for product development programs. This paper is primarily biased toward the product development programs. The paper discusses the Ares Project s approach to technology assessment. System benefit analysis, risk assessment, technology prioritization, and technology readiness assessment are addressed. A description of the technology readiness level tool being used is provided.
Tijhuis, M J; Pohjola, M V; Gunnlaugsdóttir, H; Kalogeras, N; Leino, O; Luteijn, J M; Magnússon, S H; Odekerken-Schröder, G; Poto, M; Tuomisto, J T; Ueland, O; White, B C; Holm, F; Verhagen, H
2012-01-01
An integrated benefit-risk analysis aims to give guidance in decision situations where benefits do not clearly prevail over risks, and explicit weighing of benefits and risks is thus indicated. The BEPRARIBEAN project aims to advance benefit-risk analysis in the area of food and nutrition by learning from other fields. This paper constitutes the final stage of the project, in which commonalities and differences in benefit-risk analysis are identified between the Food and Nutrition field and other fields, namely Medicines, Food Microbiology, Environmental Health, Economics and Marketing-Finance, and Consumer Perception. From this, ways forward are characterized for benefit-risk analysis in Food and Nutrition. Integrated benefit-risk analysis in Food and Nutrition may advance in the following ways: Increased engagement and communication between assessors, managers, and stakeholders; more pragmatic problem-oriented framing of assessment; accepting some risk; pre- and post-market analysis; explicit communication of the assessment purpose, input and output; more human (dose-response) data and more efficient use of human data; segmenting populations based on physiology; explicit consideration of value judgments in assessment; integration of multiple benefits and risks from multiple domains; explicit recognition of the impact of consumer beliefs, opinions, views, perceptions, and attitudes on behaviour; and segmenting populations based on behaviour; the opportunities proposed here do not provide ultimate solutions; rather, they define a collection of issues to be taken account of in developing methods, tools, practices and policies, as well as refining the regulatory context, for benefit-risk analysis in Food and Nutrition and other fields. Thus, these opportunities will now need to be explored further and incorporated into benefit-risk practice and policy. If accepted, incorporation of these opportunities will also involve a paradigm shift in Food and Nutrition benefit-risk analysis towards conceiving the analysis as a process of creating shared knowledge among all stakeholders. Copyright © 2011 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Smith, J. D.; Whealton, C.; Camp, E. R.; Horowitz, F.; Frone, Z. S.; Jordan, T. E.; Stedinger, J. R.
2015-12-01
Exploration methods for deep geothermal energy projects must primarily consider whether or not a location has favorable thermal resources. Even where the thermal field is favorable, other factors may impede project development and success. A combined analysis of these factors and their uncertainty is a strategy for moving geothermal energy proposals forward from the exploration phase at the scale of a basin to the scale of a project, and further to design of geothermal systems. For a Department of Energy Geothermal Play Fairway Analysis we assessed quality metrics, which we call risk factors, in the Appalachian Basin of New York, Pennsylvania, and West Virginia. These included 1) thermal field variability, 2) productivity of natural reservoirs from which to extract heat, 3) potential for induced seismicity, and 4) presence of thermal utilization centers. The thermal field was determined using a 1D heat flow model for 13,400 bottomhole temperatures (BHT) from oil and gas wells. Steps included the development of i) a set of corrections to BHT data and ii) depth models of conductivity stratigraphy at each borehole based on generalized stratigraphy that was verified for a select set of wells. Wells are control points in a spatial statistical analysis that resulted in maps of the predicted mean thermal field properties and of the standard error of the predicted mean. Seismic risk was analyzed by comparing earthquakes and stress orientations in the basin to gravity and magnetic potential field edges at depth. Major edges in the potential fields served as interpolation boundaries for the thermal maps (Figure 1). Natural reservoirs were identified from published studies, and productivity was determined based on the expected permeability and dimensions of each reservoir. Visualizing the natural reservoirs and population centers on a map of the thermal field communicates options for viable pilot sites and project designs (Figure 1). Furthermore, combining the four risk factors at favorable sites enables an evaluation of project feasibility across sites based on tradeoffs in the risk factors. Uncertainties in each risk factor can also be considered to determine if the tradeoffs in risk factors between sites are meaningful.
Comprehensive, Quantitative Risk Assessment of CO{sub 2} Geologic Sequestration
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lepinski, James
2013-09-30
A Quantitative Failure Modes and Effects Analysis (QFMEA) was developed to conduct comprehensive, quantitative risk assessments on CO{sub 2} capture, transportation, and sequestration or use in deep saline aquifers, enhanced oil recovery operations, or enhanced coal bed methane operations. The model identifies and characterizes potential risks; identifies the likely failure modes, causes, effects and methods of detection; lists possible risk prevention and risk mitigation steps; estimates potential damage recovery costs, mitigation costs and costs savings resulting from mitigation; and ranks (prioritizes) risks according to the probability of failure, the severity of failure, the difficulty of early failure detection and themore » potential for fatalities. The QFMEA model generates the necessary information needed for effective project risk management. Diverse project information can be integrated into a concise, common format that allows comprehensive, quantitative analysis, by a cross-functional team of experts, to determine: What can possibly go wrong? How much will damage recovery cost? How can it be prevented or mitigated? What is the cost savings or benefit of prevention or mitigation? Which risks should be given highest priority for resolution? The QFMEA model can be tailored to specific projects and is applicable to new projects as well as mature projects. The model can be revised and updated as new information comes available. It accepts input from multiple sources, such as literature searches, site characterization, field data, computer simulations, analogues, process influence diagrams, probability density functions, financial analysis models, cost factors, and heuristic best practices manuals, and converts the information into a standardized format in an Excel spreadsheet. Process influence diagrams, geologic models, financial models, cost factors and an insurance schedule were developed to support the QFMEA model. Comprehensive, quantitative risk assessments were conducted on three (3) sites using the QFMEA model: (1) SACROC Northern Platform CO{sub 2}-EOR Site in the Permian Basin, Scurry County, TX, (2) Pump Canyon CO{sub 2}-ECBM Site in the San Juan Basin, San Juan County, NM, and (3) Farnsworth Unit CO{sub 2}-EOR Site in the Anadarko Basin, Ochiltree County, TX. The sites were sufficiently different from each other to test the robustness of the QFMEA model.« less
NASA Space Radiation Risk Project: Overview and Recent Results
NASA Technical Reports Server (NTRS)
Blattnig, Steve R.; Chappell, Lori J.; George, Kerry A.; Hada, Megumi; Hu, Shaowen; Kidane, Yared H.; Kim, Myung-Hee Y.; Kovyrshina, Tatiana; Norman, Ryan B.; Nounu, Hatem N.;
2015-01-01
The NASA Space Radiation Risk project is responsible for integrating new experimental and computational results into models to predict risk of cancer and acute radiation syndrome (ARS) for use in mission planning and systems design, as well as current space operations. The project has several parallel efforts focused on proving NASA's radiation risk projection capability in both the near and long term. This presentation will give an overview, with select results from these efforts including the following topics: verification, validation, and streamlining the transition of models to use in decision making; relative biological effectiveness and dose rate effect estimation using a combination of stochastic track structure simulations, DNA damage model calculations and experimental data; ARS model improvements; pathway analysis from gene expression data sets; solar particle event probabilistic exposure calculation including correlated uncertainties for use in design optimization.
Planning to Execution Earned Value Risk Management Tool
2015-09-01
Experiments ............................................................24 b. Result Analysis ...31 B. STAKEHOLDER ANALYSIS .....................................................................33 C. OPERATIONAL-BASED SCENARIO...42 c. Simulation and Analysis Activity ............................................43 2. Project Management Phase
Space flight risk data collection and analysis project: Risk and reliability database
NASA Technical Reports Server (NTRS)
1994-01-01
The focus of the NASA 'Space Flight Risk Data Collection and Analysis' project was to acquire and evaluate space flight data with the express purpose of establishing a database containing measurements of specific risk assessment - reliability - availability - maintainability - supportability (RRAMS) parameters. The developed comprehensive RRAMS database will support the performance of future NASA and aerospace industry risk and reliability studies. One of the primary goals has been to acquire unprocessed information relating to the reliability and availability of launch vehicles and the subsystems and components thereof from the 45th Space Wing (formerly Eastern Space and Missile Command -ESMC) at Patrick Air Force Base. After evaluating and analyzing this information, it was encoded in terms of parameters pertinent to ascertaining reliability and availability statistics, and then assembled into an appropriate database structure.
Claire Sansford; Alan Inman; Joan Webber
2010-01-01
Pest Risk Analysis (PRA) is an internationally recognized, structured process of determining whether plant pests and pathogens that are absent from a country or area could enter, establish, and cause an economic or environmental risk that is deemed unacceptable. PRA is also used to help identify phytosanitary measures to reduce risks to an acceptable level. United...
Malicki, Julian; Bly, Ritva; Bulot, Mireille; Godet, Jean-Luc; Jahnen, Andreas; Krengli, Marco; Maingon, Philippe; Prieto Martin, Carlos; Przybylska, Kamila; Skrobała, Agnieszka; Valero, Marc; Jarvinen, Hannu
2017-04-01
To describe the current status of implementation of European directives for risk management in radiotherapy and to assess variability in risk management in the following areas: 1) in-country regulatory framework; 2) proactive risk assessment; (3) reactive analysis of events; and (4) reporting and learning systems. The original data were collected as part of the ACCIRAD project through two online surveys. Risk assessment criteria are closely associated with quality assurance programs. Only 9/32 responding countries (28%) with national regulations reported clear "requirements" for proactive risk assessment and/or reactive risk analysis, with wide variability in assessment methods. Reporting of adverse error events is mandatory in most (70%) but not all surveyed countries. Most European countries have taken steps to implement European directives designed to reduce the probability and magnitude of accidents in radiotherapy. Variability between countries is substantial in terms of legal frameworks, tools used to conduct proactive risk assessment and reactive analysis of events, and in the reporting and learning systems utilized. These findings underscore the need for greater harmonisation in common terminology, classification and reporting practices across Europe to improve patient safety and to enable more reliable inter-country comparisons. Copyright © 2017 Elsevier B.V. All rights reserved.
Managing Large Scale Project Analysis Teams through a Web Accessible Database
NASA Technical Reports Server (NTRS)
O'Neil, Daniel A.
2008-01-01
Large scale space programs analyze thousands of requirements while mitigating safety, performance, schedule, and cost risks. These efforts involve a variety of roles with interdependent use cases and goals. For example, study managers and facilitators identify ground-rules and assumptions for a collection of studies required for a program or project milestone. Task leaders derive product requirements from the ground rules and assumptions and describe activities to produce needed analytical products. Disciplined specialists produce the specified products and load results into a file management system. Organizational and project managers provide the personnel and funds to conduct the tasks. Each role has responsibilities to establish information linkages and provide status reports to management. Projects conduct design and analysis cycles to refine designs to meet the requirements and implement risk mitigation plans. At the program level, integrated design and analysis cycles studies are conducted to eliminate every 'to-be-determined' and develop plans to mitigate every risk. At the agency level, strategic studies analyze different approaches to exploration architectures and campaigns. This paper describes a web-accessible database developed by NASA to coordinate and manage tasks at three organizational levels. Other topics in this paper cover integration technologies and techniques for process modeling and enterprise architectures.
External risk factors affecting construction costs
NASA Astrophysics Data System (ADS)
Mubarak, Husin, Saiful; Oktaviati, Mutia
2017-11-01
Some risk factors can have impacts on the cost, time, and performance. Results of previous studies indicated that the external conditions are among the factors which give effect to the contractor in the completion of the project. The analysis in the study carried out by considering the conditions of the project in the last 15 years in Aceh province, divided into military conflict phase (2000-2004), post tsunami disaster rehabilitation and reconstruction phase (2005-2009), and post-rehabilitation and reconstruction phase (2010-present). This study intended to analyze the impact of external risk factors, primarily related to the impact on project costs and to investigate the influence of the risk factors and construction phases impacted the project cost. Data was collected by using a questionnaire distributed in 15 large companies qualification contractors in Aceh province. Factors analyzed consisted of socio-political, government policies, natural disasters, and monetary conditions. Data were analyzed using statistical application of severity index to measure the level of risk impact. The analysis results presented the tendency of impact on cost can generally be classified as low. There is only one variable classified as high-impact, variable `fuel price increases', which appear on the military conflict and post tsunami disaster rehabilitation and reconstruction periods. The risk impact on costs from the factors and variables classified with high intensity needs a serious attention, especially when the high level impact is followed by the high frequency of occurrences.
Risk management, financial evaluation and funding for wastewater and stormwater reuse projects.
Furlong, Casey; De Silva, Saman; Gan, Kein; Guthrie, Lachlan; Considine, Robert
2017-04-15
This paper has considered risk management, financial evaluation and funding in seven Australian wastewater and stormwater reuse projects. From the investigated case studies it can be seen that responsible parties have generally been well equipped to identify potential risks. In relation to financial evaluation methods some serious discrepancies, such as time periods for analysis, and how stormwater benefits are valued, have been identified. Most of the projects have required external, often National Government, funding to proceed. As National funding is likely to become less common in the future, future reuse projects may need to be funded internally by the water industry. In order to enable this the authors propose that the industry requires (1) a standard project evaluation process, and (2) an infrastructure funders' forum (or committee) with representation from both utilities and regulators, in order to compare and prioritise future reuse projects against each other. Copyright © 2017 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Emori, Seita; Takahashi, Kiyoshi; Yamagata, Yoshiki; Oki, Taikan; Mori, Shunsuke; Fujigaki, Yuko
2013-04-01
With the aim of proposing strategies of global climate risk management, we have launched a five-year research project called ICA-RUS (Integrated Climate Assessment - Risks, Uncertainties and Society). In this project with the phrase "risk management" in its title, we aspire for a comprehensive assessment of climate change risks, explicit consideration of uncertainties, utilization of best available information, and consideration of every possible conditions and options. We also regard the problem as one of decision-making at the human level, which involves social value judgments and adapts to future changes in circumstances. The ICA-RUS project consists of the following five themes: 1) Synthesis of global climate risk management strategies, 2) Optimization of land, water and ecosystem uses for climate risk management, 3) Identification and analysis of critical climate risks, 4) Evaluation of climate risk management options under technological, social and economic uncertainties and 5) Interactions between scientific and social rationalities in climate risk management (see also: http://www.nies.go.jp/ica-rus/en/). For the integration of quantitative knowledge of climate change risks and responses, we apply a tool named AIM/Impact [Policy], which consists of an energy-economic model, a simplified climate model and impact projection modules. At the same time, in order to make use of qualitative knowledge as well, we hold monthly project meetings for the discussion of risk management strategies and publish annual reports based on the quantitative and qualitative information. To enhance the comprehensiveness of the analyses, we maintain an inventory of risks and risk management options. The inventory is revised iteratively through interactive meetings with stakeholders such as policymakers, government officials and industrial representatives.
NASA Technical Reports Server (NTRS)
Statler, Irving C. (Editor)
2007-01-01
The Aviation System Monitoring and Modeling (ASMM) Project was one of the projects within NASA s Aviation Safety Program from 1999 through 2005. The objective of the ASMM Project was to develop the technologies to enable the aviation industry to undertake a proactive approach to the management of its system-wide safety risks. The ASMM Project entailed four interdependent elements: (1) Data Analysis Tools Development - develop tools to convert numerical and textual data into information; (2) Intramural Monitoring - test and evaluate the data analysis tools in operational environments; (3) Extramural Monitoring - gain insight into the aviation system performance by surveying its front-line operators; and (4) Modeling and Simulations - provide reliable predictions of the system-wide hazards, their causal factors, and their operational risks that may result from the introduction of new technologies, new procedures, or new operational concepts. This report is a documentation of the history of this highly successful project and of its many accomplishments and contributions to improved safety of the aviation system.
NASA Technical Reports Server (NTRS)
Dickinson, William B.
1995-01-01
An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.
Continuous Risk Management: An Overview
NASA Technical Reports Server (NTRS)
Rosenberg, Linda; Hammer, Theodore F.
1999-01-01
Software risk management is important because it helps avoid disasters, rework, and overkill, but more importantly because it stimulates win-win situations. The objectives of software risk management are to identify, address, and eliminate software risk items before they become threats to success or major sources of rework. In general, good project managers are also good managers of risk. It makes good business sense for all software development projects to incorporate risk management as part of project management. The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to implement risk management. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This is an introductory tutorial to continuous risk management based on this course. The rational for continuous risk management and how it is incorporated into project management are discussed. The risk management structure of six functions is discussed in sufficient depth for managers to understand what is involved in risk management and how it is implemented. These functions include: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.
Risk Costs for New Dams: Economic Analysis and Effects of Monitoring
NASA Astrophysics Data System (ADS)
Paté-Cornell, M. Elisabeth; Tagaras, George
1986-01-01
This paper presents new developments and illustrations of the introduction of risk and costs in cost-benefit analysis for new dams. The emphasis is on a method of evaluation of the risk costs based on the structure of the local economy. Costs to agricultural property as well as residential, commercial, industrial, and public property are studied in detail. Of particular interest is the case of sequential dam failure and the evaluation of the risk costs attributable to a new dam upstream from an existing one. Three real cases are presented as illustrations of the method: the Auburn Dam, the Dickey-Lincoln School Project, and the Teton Dam, which failed in 1976. This last case provides a calibration tool for the estimation of loss ratios. For these three projects, the risk-modified benefit-cost ratios are computed to assess the effect of the risk on the economic performance of the project. The role of a warning system provided by systematic monitoring of the dam is analyzed: by reducing the risk costs, the warning system attenuates their effect on the benefit-cost ratio. The precursors, however, can be missed or misinterpreted: monitoring does not guarantee that the risks to human life can be reduced to zero. This study shows, in particular, that it is critical to consider the risk costs in the decision to build a new dam when the flood area is large and densely populated.
NASA Astrophysics Data System (ADS)
Harbitz, C. B.; Frauenfelder, R.; Kaiser, G.; Glimsdal, S.; Sverdrup-thygeson, K.; Løvholt, F.; Gruenburg, L.; Mc Adoo, B. G.
2015-12-01
The 2011 Tōhoku tsunami caused a high number of fatalities and massive destruction. Data collected after the event allow for retrospective analyses. Since 2009, NGI has developed a generic GIS model for local analyses of tsunami vulnerability and mortality risk. The mortality risk convolves the hazard, exposure, and vulnerability. The hazard is represented by the maximum tsunami flow depth (with a corresponding likelihood), the exposure is described by the population density in time and space, while the vulnerability is expressed by the probability of being killed as a function of flow depth and building class. The analysis is further based on high-resolution DEMs. Normally a certain tsunami scenario with a corresponding return period is applied for vulnerability and mortality risk analysis. Hence, the model was first employed for a tsunami forecast scenario affecting Bridgetown, Barbados, and further developed in a forecast study for the city of Batangas in the Philippines. Subsequently, the model was tested by hindcasting the 2009 South Pacific tsunami in American Samoa. This hindcast was based on post-tsunami information. The GIS model was adapted for optimal use of the available data and successfully estimated the degree of mortality.For further validation and development, the model was recently applied in the RAPSODI project for hindcasting the 2011 Tōhoku tsunami in Sendai and Ishinomaki. With reasonable choices of building vulnerability, the estimated expected number of fatalities agree well with the reported death toll. The results of the mortality hindcast for the 2011 Tōhoku tsunami substantiate that the GIS model can help to identify high tsunami mortality risk areas, as well as identify the main risk drivers.The research leading to these results has received funding from CONCERT-Japan Joint Call on Efficient Energy Storage and Distribution/Resilience against Disasters (http://www.concertjapan.eu; project RAPSODI - Risk Assessment and design of Prevention Structures fOr enhanced tsunami DIsaster resilience http://www.ngi.no/en/Project-pages/RAPSODI/), and from the European Union's Seventh Framework Programme (FP7/2007-2013) under grant agreement n° 603839 (Project ASTARTE - Assessment, STrategy And Risk reduction for Tsunamis in Europe http://www.astarte-project.eu/).
2013-04-01
and Integrated Risk Management Methodologies 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e...supply chains, risk management with real options, and sustainability . [dnford@nps.edu] Thomas J. Housel—Housel specializes in valuing intellectual...maintenance services for the RDN. Damen Schelde has used an ILS since 2002 to manage the shipbuilding process from project initiation through the
Geothermal FIT Design: International Experience and U.S. Considerations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rickerson, W.; Gifford, J.; Grace, R.
2012-08-01
Developing power plants is a risky endeavor, whether conventional or renewable generation. Feed-in tariff (FIT) policies can be designed to address some of these risks, and their design can be tailored to geothermal electric plant development. Geothermal projects face risks similar to other generation project development, including finding buyers for power, ensuring adequate transmission capacity, competing to supply electricity and/or renewable energy certificates (RECs), securing reliable revenue streams, navigating the legal issues related to project development, and reacting to changes in existing regulations or incentives. Although FITs have not been created specifically for geothermal in the United States to date,more » a variety of FIT design options could reduce geothermal power plant development risks and are explored. This analysis focuses on the design of FIT incentive policies for geothermal electric projects and how FITs can be used to reduce risks (excluding drilling unproductive exploratory wells).« less
2012-06-14
Management tool • Current Risk Recon functionality • Issues Recon & Opportunity Recon – Launching Fall 2012 • FMEA and Lessons Learned – Planned Future...Lessons learned UNCLASSIFIED Integrated Risk Management FMEA Failure Mode and Effects Analysis Risk Recon Fields from FMEA software pre...populate Risk Info sheet. Risk Mitigation from Risk Recon trace back and populate FMEA , new RPN numbers. Issues Recon When a risk becomes an issue
A new Geo-Information Architecture for Risk Management in the Alps
NASA Astrophysics Data System (ADS)
Baruffini, Mi.; Thuering, M.
2009-04-01
During the last decades land-use increased significantly in the Swiss (and European) mountain regions. Due to the scarceness of areas suitable for development, anthropic activities were extended into areas prone to natural hazards such as avalanches, debris flows and rockfalls (Smith 2001). Furthermore, the transalpine transport system necessity to develop effective links in an important area collides with the need to ensure the safety of travelers and the health of the population. Consequently, an increase in losses due to hazards can be observed. To mitigate these associated losses, both traditional protective measures and land-use planning policies are to be developed and implemented to optimize future investments. Efficient protection alternatives can be obtained considering the concept of integral risk management. Risk analysis, as the central part of risk management, has become gradually a generally accepted approach for the assessment of current and future scenarios (Loat & Zimmermann 2004). The procedure aims at risk reduction which can be reached by conventional mitigation on one hand and the implementation of land-use planning on the other hand: a combination of active and passive mitigation measures is applied to prevent damage to buildings, people and infrastructures. As part of the Swiss National Science Foundation Project 54 "Evaluation of the optimal resilience for vulnerable infrastructure networks - An interdisciplinary pilot study on the transalpine transportation corridors" we study the vulnerability of infrastructures due to natural hazards. The project aims to study various natural hazards (and later, even man-made) and to obtain an evaluation of the resilience according to an interdisciplinary approach, considering the possible damage by means of risk criteria and pointing out the feasibility of conceivable measures to reduce potential damage. The project consists of a geoscientific part and an application. The fist part consists in studying the dangers (natural) and related risks in terms of infrastructure vulnerability. The application considers different types of danger (logically intersected with the transport infrastructure) and compares them with fixed values to obtain a so-called deficit. As framework we adopt The Swiss system for risk analysis of gravitational natural hazards (BUWAL 1999). In this way the project develops a methodology that makes possible a risk analysis aiming to optimize the infrastructure vulnerability and therefore allows to obtain a model designed to optimize the functionality of the network infrastructure. A simulation environment, RiskBox, is developed within the open-source GIS environment GRASS (Geographic Resources Analysis Support System) and a database (PostgreSQL) in order to manage a infrastructure data catalog. The targeted simulation environment includes the elements that identify the consecutive steps of risk analysis: hazard - vulnerability - risk. The initial results of the experimental case study show how useful a GIS-based system, which identify the risk of any single vulnerable element in the corridor and to assess the risk to the global system on the basis of priorities of the actors involved, can be for effective and efficient disaster response management, as explained in (ARMONIA Project 2007). In our work we wanted to highlight the complexity of the risk analysis methodology, difficulty that is amplified by many peculiarities in the mountain areas. In particular, the illustrative performed process can give an overview of the interests and the need to act to reduce vulnerability and the hazardous nature of the Gotthard corridor. We present the concept and current state of development of our project and our application to the testbed, the Alps-crossing corridor of St. Gotthard. REFERENCES ARMONIA Project 2007: Land use plans in Risky areas fro Unwise to Wise Practices - Materials 2nd conference. Politecnico di Milano. BUWAL 1999: Risikoanalyse bei gravitativen Naturgefahren - Methode, Fallbeispiele und Daten (Risk analyses for gravitational natural hazards). Bundesamt für Umwelt, Wald und Landschaft (BUWAL). Umwelt-Materialen Nr. 107, 1-244. Loat, R. & Zimmermann, M. 2004 : La gestion des risques en Suisse (Risk Management in Switzerland). In: Veyret, Y., Garry, G., Meschinet de Richemont, N. & Armand Colin (eds) 2002: Colloque Arche de la Défense 22-24 octobre 2002, dans Risques naturels et aménagement en Europe, 108-120. Smith, K. 2001: Environmental hazards. Assessing the risk and reducing disaster. Third edition. London
[Impact of water pollution risk in water transfer project based on fault tree analysis].
Liu, Jian-Chang; Zhang, Wei; Wang, Li-Min; Li, Dai-Qing; Fan, Xiu-Ying; Deng, Hong-Bing
2009-09-15
The methods to assess water pollution risk for medium water transfer are gradually being explored. The event-nature-proportion method was developed to evaluate the probability of the single event. Fault tree analysis on the basis of calculation on single event was employed to evaluate the extent of whole water pollution risk for the channel water body. The result indicates, that the risk of pollutants from towns and villages along the line of water transfer project to the channel water body is at high level with the probability of 0.373, which will increase pollution to the channel water body at the rate of 64.53 mg/L COD, 4.57 mg/L NH4(+) -N and 0.066 mg/L volatilization hydroxybenzene, respectively. The measurement of fault probability on the basis of proportion method is proved to be useful in assessing water pollution risk under much uncertainty.
Radiation Risk Projections for Space Travel
NASA Technical Reports Server (NTRS)
Cucinotta, Francis
2003-01-01
Space travelers are exposed to solar and galactic cosmic rays comprised of protons and heavy ions moving with velocities close to the speed of light. Cosmic ray heavy ions are known to produce more severe types of biomolecular damage in comparison to terrestrial forms of radiation, however the relationship between such damage and disease has not been fully elucidated. On Earth, we are protected from cosmic rays by atmospheric and magnetic shielding, and only the remnants of cosmic rays in the form of ground level muons and other secondary radiations are present. Because human epidemiology data is lacking for cosmic rays, risk projection must rely on theoretical understanding and data from experimental models exposed to space radiation using charged particle accelerators to simulate space radiation. Although the risks of cancer and other late effects from cosmic rays are currently believed to present a severe challenge to space travel, this challenge is centered on our lack of confidence in risk projections methodologies. We review biophysics and radiobiology data on the effects of the cosmic ray heavy ions, and the current methods used to project radiation risks . Cancer risk projections are described as a product of many biological and physical factors, each of which has a differential range of uncertainty due to lack of data and knowledge. Risk projections for space travel are described using Monte-Carlo sampling from subjective error di stributions that represent the lack of knowledge in each factor that contributes to the projection model in order to quantify the overall uncertainty in risk projections. This analysis is applied to space mi ssion scenarios including lunar colony, deep space outpost, and a Mars mission. Results suggest that the number of days in space where cancer mortality risks can be assured at a 95% confidence level to be below the maximum acceptable risk for radi ation workers on Earth or the International Space Station is only on the order of 100-200 days. Approaches to reduce these unceI1ainties and mitigate risks are described.
Chemical facility vulnerability assessment project.
Jaeger, Calvin D
2003-11-14
Sandia National Laboratories, under the direction of the Office of Science and Technology, National Institute of Justice, conducted the chemical facility vulnerability assessment (CFVA) project. The primary objective of this project was to develop, test and validate a vulnerability assessment methodology (VAM) for determining the security of chemical facilities against terrorist or criminal attacks (VAM-CF). The project also included a report to the Department of Justice for Congress that in addition to describing the VAM-CF also addressed general observations related to security practices, threats and risks at chemical facilities and chemical transport. In the development of the VAM-CF Sandia leveraged the experience gained from the use and development of VAs in other areas and the input from the chemical industry and Federal agencies. The VAM-CF is a systematic, risk-based approach where risk is a function of the severity of consequences of an undesired event, the attack potential, and the likelihood of adversary success in causing the undesired event. For the purpose of the VAM-CF analyses Risk is a function of S, L(A), and L(AS), where S is the severity of consequence of an event, L(A) is the attack potential and L(AS) likelihood of adversary success in causing a catastrophic event. The VAM-CF consists of 13 basic steps. It involves an initial screening step, which helps to identify and prioritize facilities for further analysis. This step is similar to the prioritization approach developed by the American Chemistry Council (ACC). Other steps help to determine the components of the risk equation and ultimately the risk. The VAM-CF process involves identifying the hazardous chemicals and processes at a chemical facility. It helps chemical facilities to focus their attention on the most critical areas. The VAM-CF is not a quantitative analysis but, rather, compares relative security risks. If the risks are deemed too high, recommendations are developed for measures to reduce the risk. This paper will briefly discuss the CFVA project and VAM-CF process.
NASA Astrophysics Data System (ADS)
Otieno, George A.; Loosen, Alexander E.
2016-05-01
Concentrated Solar Power projects have impacts on local environment and social conditions. This research set out to investigate the environmental and social risks in the development of such projects and rank these risks from highest to lowest. The risks were analysed for parabolic trough and tower technologies only. A literature review was undertaken, identifying seventeen risks that were then proposed to six CSP experts for scoring. The risks were scored based of five factors on a five tier scale. The scores from the experts were compiled to develop an overall rank of the identified risks. The risk of disruption of local water resources was found to represent the highest risk before and after mitigation with a score of moderate-high and moderate respectively. This score is linked to the importance of water in water scarce regions typified by the best regions for CSP. The risks to avian species, to worker health and safety, due to noise on the environment, to visual and recreational resources completed the top five risks after mitigation.
Space Radiation Cancer Risk Projections and Uncertainties - 2010
NASA Technical Reports Server (NTRS)
Cucinotta, Francis A.; Kim, Myung-Hee Y.; Chappell, Lori J.
2011-01-01
Uncertainties in estimating health risks from galactic cosmic rays greatly limit space mission lengths and potential risk mitigation evaluations. NASA limits astronaut exposures to a 3% risk of exposure-induced death and protects against uncertainties using an assessment of 95% confidence intervals in the projection model. Revisions to this model for lifetime cancer risks from space radiation and new estimates of model uncertainties are described here. We review models of space environments and transport code predictions of organ exposures, and characterize uncertainties in these descriptions. We summarize recent analysis of low linear energy transfer radio-epidemiology data, including revision to Japanese A-bomb survivor dosimetry, longer follow-up of exposed cohorts, and reassessments of dose and dose-rate reduction effectiveness factors. We compare these projections and uncertainties with earlier estimates. Current understanding of radiation quality effects and recent data on factors of relative biological effectiveness and particle track structure are reviewed. Recent radiobiology experiment results provide new information on solid cancer and leukemia risks from heavy ions. We also consider deviations from the paradigm of linearity at low doses of heavy ions motivated by non-targeted effects models. New findings and knowledge are used to revise the NASA risk projection model for space radiation cancer risks.
Whalley, H C; Kestelman, J N; Rimmington, J E; Kelso, A; Abukmeil, S S; Best, J J; Johnstone, E C; Lawrie, S M
1999-07-30
The Edinburgh High Risk Project is a longitudinal study of brain structure (and function) in subjects at high risk of developing schizophrenia in the next 5-10 years for genetic reasons. In this article we describe the methods of volumetric analysis of structural magnetic resonance images used in the study. We also consider potential sources of error in these methods: the validity of our image analysis techniques; inter- and intra-rater reliability; possible positional variation; and thresholding criteria used in separating brain from cerebro-spinal fluid (CSF). Investigation with a phantom test object (of similar imaging characteristics to the brain) provided evidence for the validity of our image acquisition and analysis techniques. Both inter- and intra-rater reliability were found to be good in whole brain measures but less so for smaller regions. There were no statistically significant differences in positioning across the three study groups (patients with schizophrenia, high risk subjects and normal volunteers). A new technique for thresholding MRI scans longitudinally is described (the 'rescale' method) and compared with our established method (thresholding by eye). Few differences between the two techniques were seen at 3- and 6-month follow-up. These findings demonstrate the validity and reliability of the structural MRI analysis techniques used in the Edinburgh High Risk Project, and highlight methodological issues of general concern in cross-sectional and longitudinal studies of brain structure in healthy control subjects and neuropsychiatric populations.
Scalable collaborative risk management technology for complex critical systems
NASA Technical Reports Server (NTRS)
Campbell, Scott; Torgerson, Leigh; Burleigh, Scott; Feather, Martin S.; Kiper, James D.
2004-01-01
We describe here our project and plans to develop methods, software tools, and infrastructure tools to address challenges relating to geographically distributed software development. Specifically, this work is creating an infrastructure that supports applications working over distributed geographical and organizational domains and is using this infrastructure to develop a tool that supports project development using risk management and analysis techniques where the participants are not collocated.
A phased approach to induced seismicity risk management
White, Joshua A.; Foxall, William
2014-01-01
This work describes strategies for assessing and managing induced seismicity risk during each phase of a carbon storage project. We consider both nuisance and damage potential from induced earthquakes, as well as the indirect risk of enhancing fault leakage pathways. A phased approach to seismicity management is proposed, in which operations are continuously adapted based on available information and an on-going estimate of risk. At each project stage, specific recommendations are made for (a) monitoring and characterization, (b) modeling and analysis, and (c) site operations. The resulting methodology can help lower seismic risk while ensuring site operations remain practical andmore » cost-effective.« less
Simulation of investment returns of toll projects.
DOT National Transportation Integrated Search
2013-08-01
This research develops a methodological framework to illustrate key stages in applying the simulation of investment returns of toll projects, acting as an example process of helping agencies conduct numerical risk analysis by taking certain uncertain...
de Dianous, Valérie; Fiévez, Cécile
2006-03-31
Over the last two decades a growing interest for risk analysis has been noted in the industries. The ARAMIS project has defined a methodology for risk assessment. This methodology has been built to help the industrialist to demonstrate that they have a sufficient risk control on their site. Risk analysis consists first in the identification of all the major accidents, assuming that safety functions in place are inefficient. This step of identification of the major accidents uses bow-tie diagrams. Secondly, the safety barriers really implemented on the site are taken into account. The barriers are identified on the bow-ties. An evaluation of their performance (response time, efficiency, and level of confidence) is performed to validate that they are relevant for the expected safety function. At last, the evaluation of their probability of failure enables to assess the frequency of occurrence of the accident. The demonstration of the risk control based on a couple gravity/frequency of occurrence is also possible for all the accident scenarios. During the risk analysis, a practical tool called risk graph is used to assess if the number and the reliability of the safety functions for a given cause are sufficient to reach a good risk control.
NASA Technical Reports Server (NTRS)
Fragola, Joseph R.; Maggio, Gaspare; Frank, Michael V.; Gerez, Luis; Mcfadden, Richard H.; Collins, Erin P.; Ballesio, Jorge; Appignani, Peter L.; Karns, James J.
1995-01-01
Volume 5 is Appendix C, Auxiliary Shuttle Risk Analyses, and contains the following reports: Probabilistic Risk Assessment of Space Shuttle Phase 1 - Space Shuttle Catastrophic Failure Frequency Final Report; Risk Analysis Applied to the Space Shuttle Main Engine - Demonstration Project for the Main Combustion Chamber Risk Assessment; An Investigation of the Risk Implications of Space Shuttle Solid Rocket Booster Chamber Pressure Excursions; Safety of the Thermal Protection System of the Space Shuttle Orbiter - Quantitative Analysis and Organizational Factors; Space Shuttle Main Propulsion Pressurization System Probabilistic Risk Assessment, Final Report; and Space Shuttle Probabilistic Risk Assessment Proof-of-Concept Study - Auxiliary Power Unit and Hydraulic Power Unit Analysis Report.
Incorporating psychological influences in probabilistic cost analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kujawski, Edouard; Alvaro, Mariana; Edwards, William
2004-01-08
Today's typical probabilistic cost analysis assumes an ''ideal'' project that is devoid of the human and organizational considerations that heavily influence the success and cost of real-world projects. In the real world ''Money Allocated Is Money Spent'' (MAIMS principle); cost underruns are rarely available to protect against cost overruns while task overruns are passed on to the total project cost. Realistic cost estimates therefore require a modified probabilistic cost analysis that simultaneously models the cost management strategy including budget allocation. Psychological influences such as overconfidence in assessing uncertainties and dependencies among cost elements and risks are other important considerations thatmore » are generally not addressed. It should then be no surprise that actual project costs often exceed the initial estimates and are delivered late and/or with a reduced scope. This paper presents a practical probabilistic cost analysis model that incorporates recent findings in human behavior and judgment under uncertainty, dependencies among cost elements, the MAIMS principle, and project management practices. Uncertain cost elements are elicited from experts using the direct fractile assessment method and fitted with three-parameter Weibull distributions. The full correlation matrix is specified in terms of two parameters that characterize correlations among cost elements in the same and in different subsystems. The analysis is readily implemented using standard Monte Carlo simulation tools such as {at}Risk and Crystal Ball{reg_sign}. The analysis of a representative design and engineering project substantiates that today's typical probabilistic cost analysis is likely to severely underestimate project cost for probability of success values of importance to contractors and procuring activities. The proposed approach provides a framework for developing a viable cost management strategy for allocating baseline budgets and contingencies. Given the scope and magnitude of the cost-overrun problem, the benefits are likely to be significant.« less
A Framework for Assessment of Aviation Safety Technology Portfolios
NASA Technical Reports Server (NTRS)
Jones, Sharon M.; Reveley, Mary S.
2014-01-01
The programs within NASA's Aeronautics Research Mission Directorate (ARMD) conduct research and development to improve the national air transportation system so that Americans can travel as safely as possible. NASA aviation safety systems analysis personnel support various levels of ARMD management in their fulfillment of system analysis and technology prioritization as defined in the agency's program and project requirements. This paper provides a framework for the assessment of aviation safety research and technology portfolios that includes metrics such as projected impact on current and future safety, technical development risk and implementation risk. The paper also contains methods for presenting portfolio analysis and aviation safety Bayesian Belief Network (BBN) output results to management using bubble charts and quantitative decision analysis techniques.
Keast, Shellie L; Jacobs, Elgene; Harrison, Donald; Farmer, Kevin; Thompson, David
2010-09-01
There is growing concern over increasingly limited access to local health care, including pharmacies, for rural citizens of the United States. Although geographically distant from most competitors, rural pharmacies may still struggle to generate an acceptable profit to remain economically viable. Therefore, a method for calculating the economic viability for a community pharmacy to recruit a potential new owner to assume the entrepreneurial risk is an important issue to consider when evaluating rural pharmacy access. The primary objective of this study was to use a modified break-even analysis to predict the future financial potential of the current pharmacy business to attract a new owner. The secondary objective was to forecast a risk level for a Nebraska county to sustain the number of pharmacies in the country beyond current ownership. This research used data provided by pharmacies that responded to a Nebraska Medicaid cost of dispensing (COD) survey in addition to data from the US Census Bureau, US Office of Management and Budget, and the Nebraska State Board of Pharmacy. Break-even analysis was used to determine the point where the prescription volume of the pharmacy not only covered the variable and fixed costs but also maintained a reasonable profit to attract new ownership. Counties were classified into 3 risk levels based on the projected available prescription volume and the number of pharmacies in each county. Sensitivity analysis was performed on the risk levels to determine the impact of variance in projected available prescription volume on the projected future outlook for the pharmacies in each county. Regression analysis of responses to the COD survey indicated that the annual break-even prescription volume ranged from 44,790 to 49,246 prescriptions per pharmacy per annum. The number of rural Nebraska pharmacies was projected to decline from 126 to 78. The number of counties in Nebraska without a single pharmacy was projected to increase from 19 to 26, and the number of counties with just one pharmacy was projected to increase from 17 to 31. Thus, the number of counties with 1 or no pharmacy was projected to increase to 57 out of the total 93 Nebraska counties. The forecasted closure of pharmacies in rural areas will cause significant portions of the state to be without a pharmacy. Low county populations will be unable to sustain a local prescription volume large enough to remove them from the high risk of pharmacy closure. Copyright 2010 Elsevier Inc. All rights reserved.
Need for, and financial feasibility of, satellite-aided land mobile communications
NASA Technical Reports Server (NTRS)
Castruccio, P. A.; Marantz, C. S.; Freibaum, J.
1982-01-01
Questions regarding the role of a mobile-satellite system in augmenting the terrestrial communications system are considered, and a market assessment study is discussed. Aspects of an investment analysis are examined, taking into account a three phase financial study of four postulated land Mobile Satellite Service (LMSS) systems, project profitability evaluation methods, risk analysis methods, financial projections, potential investor acceptance standards, and a risk analysis. It is concluded that a satellite augmented terrestrial mobile service appears to be economically and technically superior to a service depending exclusively on terrestrial systems. The interest in the Mobile Satellite Service is found to be worldwide, and the ground equipment market is potentially large.
Evaluation of a proposed expert system development methodology: Two case studies
NASA Technical Reports Server (NTRS)
Gilstrap, Lewey
1990-01-01
Two expert system development projects were studied to evaluate a proposed Expert Systems Development Methodology (ESDM). The ESDM was developed to provide guidance to managers and technical personnel and serve as a standard in the development of expert systems. It was agreed that the proposed ESDM must be evaluated before it could be adopted; therefore a study was planned for its evaluation. This detailed study is now underway. Before the study began, however, two ongoing projects were selected for a retrospective evaluation. They were the Ranging Equipment Diagnostic Expert System (REDEX) and the Backup Control Mode Analysis and Utility System (BCAUS). Both projects were approximately 1 year into development. Interviews of project personnel were conducted, and the resulting data was used to prepare the retrospective evaluation. Decision models of the two projects were constructed and used to evaluate the completeness and accuracy of key provisions of ESDM. A major conclusion reached from these case studies is that suitability and risk analysis should be required for all AI projects, large and small. Further, the objectives of each stage of development during a project should be selected to reduce the next largest area of risk or uncertainty on the project.
Revenue Risk Modelling and Assessment on BOT Highway Project
NASA Astrophysics Data System (ADS)
Novianti, T.; Setyawan, H. Y.
2018-01-01
The infrastructure project which is considered as a public-private partnership approach under BOT (Build-Operate-Transfer) arrangement, such as a highway, is risky. Therefore, assessment on risk factors is essential as the project have a concession period and is influenced by macroeconomic factors and consensus period. In this study, pre-construction risks of a highway were examined by using a Delphi method to create a space for offline expert discussions; a fault tree analysis to map intuition of experts and to create a model from the underlying risk events; a fuzzy logic to interpret the linguistic data of risk models. The loss of revenue for risk tariff, traffic volume, force majeure, and income were then measured. The results showed that the loss of revenue caused by the risk tariff was 10.5% of the normal total revenue. The loss of revenue caused by the risk of traffic volume was 21.0% of total revenue. The loss of revenue caused by the force majeure was 12.2% of the normal income. The loss of income caused by the non-revenue events was 6.9% of the normal revenue. It was also found that the volume of traffic was the major risk of a highway project because it related to customer preferences.
The study on stage financing model of IT project investment.
Chen, Si-hua; Xu, Sheng-hua; Lee, Changhoon; Xiong, Neal N; He, Wei
2014-01-01
Stage financing is the basic operation of venture capital investment. In investment, usually venture capitalists use different strategies to obtain the maximum returns. Due to its advantages to reduce the information asymmetry and agency cost, stage financing is widely used by venture capitalists. Although considerable attentions are devoted to stage financing, very little is known about the risk aversion strategies of IT projects. This paper mainly addresses the problem of risk aversion of venture capital investment in IT projects. Based on the analysis of characteristics of venture capital investment of IT projects, this paper introduces a real option pricing model to measure the value brought by the stage financing strategy and design a risk aversion model for IT projects. Because real option pricing method regards investment activity as contingent decision, it helps to make judgment on the management flexibility of IT projects and then make a more reasonable evaluation about the IT programs. Lastly by being applied to a real case, it further illustrates the effectiveness and feasibility of the model.
The Study on Stage Financing Model of IT Project Investment
Xu, Sheng-hua; Xiong, Neal N.
2014-01-01
Stage financing is the basic operation of venture capital investment. In investment, usually venture capitalists use different strategies to obtain the maximum returns. Due to its advantages to reduce the information asymmetry and agency cost, stage financing is widely used by venture capitalists. Although considerable attentions are devoted to stage financing, very little is known about the risk aversion strategies of IT projects. This paper mainly addresses the problem of risk aversion of venture capital investment in IT projects. Based on the analysis of characteristics of venture capital investment of IT projects, this paper introduces a real option pricing model to measure the value brought by the stage financing strategy and design a risk aversion model for IT projects. Because real option pricing method regards investment activity as contingent decision, it helps to make judgment on the management flexibility of IT projects and then make a more reasonable evaluation about the IT programs. Lastly by being applied to a real case, it further illustrates the effectiveness and feasibility of the model. PMID:25147845
NASA Astrophysics Data System (ADS)
Dentoni, Marta; Deidda, Roberto; Paniconi, Claudio; Marrocu, Marino; Lecca, Giuditta
2014-05-01
Seawater intrusion (SWI) has become a major threat to coastal freshwater resources, particularly in the Mediterranean basin, where this problem is exacerbated by the lack of appropriate groundwater resources management and with serious potential impacts from projected climate changes. A proper analysis and risk assessment that includes climate scenarios is essential for the design of water management measures to mitigate the environmental and socio-economic impacts of SWI. In this study a methodology for SWI risk analysis in coastal aquifers is developed and applied to the Gaza Strip coastal aquifer in Palestine. The method is based on the origin-pathway-target model, evaluating the final value of SWI risk by applying the overlay principle to the hazard map (representing the origin of SWI), the vulnerability map (representing the pathway of groundwater flow) and the elements map (representing the target of SWI). Results indicate the important role of groundwater simulation in SWI risk assessment and illustrate how mitigation measures can be developed according to predefined criteria to arrive at quantifiable expected benefits. Keywords: Climate change, coastal aquifer, seawater intrusion, risk analysis, simulation/optimization model. Acknowledgements. The study is partially funded by the project "Climate Induced Changes on the Hydrology of Mediterranean Basins (CLIMB)", FP7-ENV-2009-1, GA 244151.
Risk Management of NASA Projects
NASA Technical Reports Server (NTRS)
Sarper, Hueseyin
1997-01-01
Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.
Paques, Joseph-Jean; Gauthier, François; Perez, Alejandro
2007-01-01
To assess and plan future risk-analysis research projects, 275 documents describing methods and tools for assessing the risks associated with industrial machines or with other sectors such as the military, and the nuclear and aeronautics industries, etc., were collected. These documents were in the format of published books or papers, standards, technical guides and company procedures collected throughout industry. From the collected documents, 112 documents were selected for analysis; 108 methods applied or potentially applicable for assessing the risks associated with industrial machines were analyzed and classified. This paper presents the main quantitative results of the analysis of the methods and tools.
Deep Uncertainty Surrounding Coastal Flood Risk Projections: A Case Study for New Orleans
NASA Astrophysics Data System (ADS)
Wong, Tony E.; Keller, Klaus
2017-10-01
Future sea-level rise drives severe risks for many coastal communities. Strategies to manage these risks hinge on a sound characterization of the uncertainties. For example, recent studies suggest that large fractions of the Antarctic ice sheet (AIS) may rapidly disintegrate in response to rising global temperatures, leading to potentially several meters of sea-level rise during the next few centuries. It is deeply uncertain, for example, whether such an AIS disintegration will be triggered, how much this would increase sea-level rise, whether extreme storm surges intensify in a warming climate, or which emissions pathway future societies will choose. Here, we assess the impacts of these deep uncertainties on projected flooding probabilities for a levee ring in New Orleans, LA. We use 18 scenarios, presenting probabilistic projections within each one, to sample key deeply uncertain future projections of sea-level rise, radiative forcing pathways, storm surge characterization, and contributions from rapid AIS mass loss. The implications of these deep uncertainties for projected flood risk are thus characterized by a set of 18 probability distribution functions. We use a global sensitivity analysis to assess which mechanisms contribute to uncertainty in projected flood risk over the course of a 50-year design life. In line with previous work, we find that the uncertain storm surge drives the most substantial risk, followed by general AIS dynamics, in our simple model for future flood risk for New Orleans.
Engineering risk assessment for emergency disposal projects of sudden water pollution incidents.
Shi, Bin; Jiang, Jiping; Liu, Rentao; Khan, Afed Ullah; Wang, Peng
2017-06-01
Without an engineering risk assessment for emergency disposal in response to sudden water pollution incidents, responders are prone to be challenged during emergency decision making. To address this gap, the concept and framework of emergency disposal engineering risks are reported in this paper. The proposed risk index system covers three stages consistent with the progress of an emergency disposal project. Fuzzy fault tree analysis (FFTA), a logical and diagrammatic method, was developed to evaluate the potential failure during the process of emergency disposal. The probability of basic events and their combination, which caused the failure of an emergency disposal project, were calculated based on the case of an emergency disposal project of an aniline pollution incident in the Zhuozhang River, Changzhi, China, in 2014. The critical events that can cause the occurrence of a top event (TE) were identified according to their contribution. Finally, advices on how to take measures using limited resources to prevent the failure of a TE are given according to the quantified results of risk magnitude. The proposed approach could be a potential useful safeguard for the implementation of an emergency disposal project during the process of emergency response.
NASA Astrophysics Data System (ADS)
Schumacher, Sandra; Pierau, Roberto; Wirth, Wolfgang
2017-04-01
In recent years, the development of geothermal plants in Germany has increased significantly due to a favorable political setting and resulting financial incentives. However, most projects are developed by local communities or private investors, which cannot afford a project to fail. To cover the risk of total loss if the geothermal well should not provide the energy output necessary for an economically viable project, investors try to procure insurances for this worst case scenario. In order to issue such insurances, the insurance companies insist on so called probability-of-success studies (POS studies), in which the geological risk for not achieving the necessary temperatures and/or flow rates for an economically successful project is quantified. Quantifying the probability of reaching a minimum temperature, which has to be defined by the project investors, is relatively straight forward as subsurface temperatures in Germany are comparatively well known due tens of thousands of hydrocarbon wells. Moreover, for the German Molasse Basin a method to characterize the hydraulic potential of a site based on pump test analysis has been developed and refined in recent years. However, to quantify the probability of reaching a given flow rate with a given drawdown is much more challenging in areas where pump test data are generally not available (e.g. the North German Basin). Therefore, a new method based on log and core derived porosity and permeability data was developed to quantify the geological risk of reaching a determined flow rate in such areas. We present both methods for POS studies and show how subsurface data such as pump tests or log and core measurements can be used to predict the chances of a potential geothermal project from a geological point of view.
Kidney-Failure Risk Projection for the Living Kidney-Donor Candidate.
Grams, Morgan E; Sang, Yingying; Levey, Andrew S; Matsushita, Kunihiro; Ballew, Shoshana; Chang, Alex R; Chow, Eric K H; Kasiske, Bertram L; Kovesdy, Csaba P; Nadkarni, Girish N; Shalev, Varda; Segev, Dorry L; Coresh, Josef; Lentine, Krista L; Garg, Amit X
2016-02-04
Evaluation of candidates to serve as living kidney donors relies on screening for individual risk factors for end-stage renal disease (ESRD). To support an empirical approach to donor selection, we developed a tool that simultaneously incorporates multiple health characteristics to estimate a person's probable long-term risk of ESRD if that person does not donate a kidney. We used risk associations from a meta-analysis of seven general population cohorts, calibrated to the population-level incidence of ESRD and mortality in the United States, to project the estimated long-term incidence of ESRD among persons who do not donate a kidney, according to 10 demographic and health characteristics. We then compared 15-year projections with the observed risk among 52,998 living kidney donors in the United States. A total of 4,933,314 participants from seven cohorts were followed for a median of 4 to 16 years. For a 40-year-old person with health characteristics that were similar to those of age-matched kidney donors, the 15-year projections of the risk of ESRD in the absence of donation varied according to race and sex; the risk was 0.24% among black men, 0.15% among black women, 0.06% among white men, and 0.04% among white women. Risk projections were higher in the presence of a lower estimated glomerular filtration rate, higher albuminuria, hypertension, current or former smoking, diabetes, and obesity. In the model-based lifetime projections, the risk of ESRD was highest among persons in the youngest age group, particularly among young blacks. The 15-year observed risks after donation among kidney donors in the United States were 3.5 to 5.3 times as high as the projected risks in the absence of donation. Multiple demographic and health characteristics may be used together to estimate the projected long-term risk of ESRD among living kidney-donor candidates and to inform acceptance criteria for kidney donors. (Funded by the National Institute of Diabetes and Digestive and Kidney Diseases and others.).
Financial and risk considerations for successful disease management programs.
Baldwin, A L
1999-11-01
Results for disease management [DM] programs have not been as positive as hoped because of clinical issues, lack of access to capital, and administrative issues. The financial experience of DM programs can be quite volatile. Financial projections that are protocol-based, rather than experience-based, may understate the revenue required and the range of possible costs for a DM program by understating the impact of complicating conditions and comorbidities. Actuarial tools (risk analysis and risk projection models) support better understanding of DM contracts. In particular, these models can provide the ability to quantify the impact of the factors that drive costs of a contract and the volatility of those costs. This analysis can assist DM companies in setting appropriate revenue and capital targets. Similar analysis by health plans can identify diseases that are good candidates for DM programs and can provide the basis for performance targets.
Making real options really work.
van Putten, Alexander B; MacMillan, Ian C
2004-12-01
As a way to value growth opportunities, real options have had a difficult time catching on with managers. Many CFOs believe the method ensures the overvaluation of risky projects. This concern is legitimate, but abandoning real options as a valuation model isn't the solution. Companies that rely solely on discounted cash flow (DCF) analysis underestimate the value of their projects and may fail to invest enough in uncertain but highly promising opportunities. CFOs need not--and should not--choose one approach over the other. Far from being a replacement for DCF analysis, real options are an essential complement, and a project's total value should encompass both. DCF captures a base estimate of value; real options take into account the potential for big gains. This is not to say that there aren't problems with real options. As currently applied, they focus almost exclusively on the risks associated with revenues, ignoring the risks associated with a project's costs. It's also true that option valuations almost always ignore assets that an initial investment in a subsequently abandoned project will often leave the company. In this article, the authors present a simple formula for combining DCF and option valuations that addresses these two problems. Using an integrated approach, managers will, in the long run, select better projects than their more timid competitors while keeping risk under control. Thus, they will outperform their rivals in both the product and the capital markets.
PSP, TSP, XP, CMMI...Eating the Alphabet Soup!
2011-05-19
Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other...4 Q tit t Continuous process improvement Organizational Performance Management Causal Analysis and Resolution Level Focus Process Areas Requirements...Project Management process standardization Risk management Decision Analysis and Resolution Product Integration 2 M d R i t t anage Basic Project
The Contribution of Human Factors in Military System Development: Methodological Considerations
1980-07-01
Risk/Uncertainty Analysis - Project Scoring - Utility Scales - Relevance Tree Techniques (Reverse Factor Analysis) 2. Computer Simulation Simulation...effectiveness of mathematical models for R&D project selection. Management Science, April 1973, 18. 6-43 .1~ *.-. Souder, W.E. h scoring methodology for...per some interval PROFICIENCY test scores (written) RADIATION radiation effects aircrew performance on radiation environments REACTION TIME 1) (time
Air Force Project Risk Management - The Impact of Inconsistent Processes
2016-09-15
grave development of a project. The Challenger disaster drove rigor in process based risk analysis which began to emerge formally in the early 1990’s...is a natural tendency to be aggressive with assumptions early in a program to make the program appear attractive” (p. 30). The literature dovetails...and having an unwanted pregnancy (Burger & Burns, 1988). Investigations revealed that the siting of the Fukushima Daiichi reactors and a 5.7
Holistic environmental assessment and offshore oil field exploration and production.
Salter, E; Ford, J
2001-01-01
According to UK Government surveys, concern for the environment is growing. Environmental regulation of the industry is becoming wider in its scope and tougher in its implementation. Various techniques are available to assess how the industry can drive down its environmental impact and comply with environmental regulation. Environmental Assessments (EA) required by European law do not cover the whole life cycle of the project that they are analysing. Life Cycle Analysis (LCA) was developed to assess the environmental loadings of a product, process or activity over its entire life cycle. It was the first technique used in environmental analysis that adopted what was described as a holistic approach. It fails this approach by not assessing accidental emissions or environmental impacts other than those that are direct. Cost Benefit Analysis (CBA) offers the opportunity to value environmental effects and appraise a project on the basis of costs and benefits. Not all environmental effects can be valued and of those that can there is considerable uncertainty in their valuation and occurrence. CBA cannot satisfactorily measure the total environmental risk of a project. Consequently there is a need for a technique that overcomes the failures of project-level EA, LCA and CBA, and assesses total environmental risk. Many organizations such as, the British Medical Association, the European Oilfield Speciality Chemicals Association, the Royal Ministry of Petroleum and Energy (Norway) and Shell Expro now recognize that a holistic approach is an integral part of assessing total risk. The Brent SPAR case study highlights the interdisciplinary nature required of any environmental analysis. Holistic Environmental Assessment is recommended as such an environmental analysis.
Continuous Risk Management: A NASA Program Initiative
NASA Technical Reports Server (NTRS)
Hammer, Theodore F.; Rosenberg, Linda
1999-01-01
NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.
Life cycle cost-based risk model for energy performance contracting retrofits
NASA Astrophysics Data System (ADS)
Berghorn, George H.
Buildings account for 41% of the primary energy consumption in the United States, nearly half of which is accounted for by commercial buildings. Among the greatest energy users are those in the municipalities, universities, schools, and hospitals (MUSH) market. Correctional facilities are in the upper half of all commercial building types for energy intensity. Public agencies have experienced reduced capital budgets to fund retrofits; this has led to the increased use of energy performance contracts (EPC), which are implemented by energy services companies (ESCOs). These companies guarantee a minimum amount of energy savings resulting from the retrofit activities, which in essence transfers performance risk from the owner to the contractor. Building retrofits in the MUSH market, especially correctional facilities, are well-suited to EPC, yet despite this potential and their high energy intensities, efficiency improvements lag behind that of other public building types. Complexities in project execution, lack of support for data requests and sub-metering, and conflicting project objectives have been cited as reasons for this lag effect. As a result, project-level risks must be understood in order to support wider adoption of retrofits in the public market, in particular the correctional facility sub-market. The goal of this research is to understand risks related to the execution of energy efficiency retrofits delivered via EPC in the MUSH market. To achieve this goal, in-depth analysis and improved understanding was sought with regard to ESCO risks that are unique to EPC in this market. The proposed work contributes to this understanding by developing a life cycle cost-based risk model to improve project decision making with regard to risk control and reduction. The specific objectives of the research are: (1) to perform an exploratory analysis of the EPC retrofit process and identify key areas of performance risk requiring in-depth analysis; (2) to construct a framework describing the sources of and mitigation strategies employed for assessing key risks in EPC retrofits; (3) to develop a strategy for analyzing and evaluating risks for EPC retrofits focused on managing expected costs throughout the project life cycle, and use data collected through this strategy to develop and parameterize a risk model; and (4) to demonstrate the applicability of the proposed life cost-based risk model through a pilot application to a case study site. Five major contributions to the body of knowledge resulting from the research include: (1) a consensus-based assessment of ESCO risk management; (2) characterization of EPC retrofit risks borne by ESCOs; (3) an empirical evaluation of scenario failure mode and effects analysis and its application to this domain; (4) development and pilot application of a life cycle cost-based risk model; and (5) future expansion of the research approach to other domains. The researcher envisions that full implementation of the research will further encourage the growth of the energy services industry, and support focused retrofits in complex building types that typically can benefit the most from such work. Ultimately, this will reduce the energy consumption of public sector buildings to levels that are more fitting with the global principles of sustainability and responsible management of constrained resources.
Risk Analysis of Underestimate Cost Offer to The Project Quality in Aceh Province
NASA Astrophysics Data System (ADS)
Rani, Hafnidar A.
2016-11-01
The possibility of errors in the process of offer price determination could be enormous, so it can affect the possibility of project underestimate cost which can impact and reduce the profit if being implementing. Government Equipment/Service Procurement Policy Institution (LKPP) assesses that the practices of cheaper price in the government equipment/service procurement are still highly found and can be potential to decrease the project quality. This study aimed to analyze the most dominant factors happened in underestimate cost offer practice, to analyze the relationship of underestimate cost offer risk factors to road construction project quality in Aceh Province and to analyze the most potential factors of underestimate cost offer risk affecting road construction project quality in Aceh Province. Road construction projects observed the projects which have been implemented in Aceh Province since 2013 - 2015. This study conducted by interviewing Government Budget Authority (KPA), and distributing the questionnaire to the road construction contractors with the qualification of K1, K2, K3, M1, M2 and B1. Based on the data from Construction Service Development Institution (LPJK) of Aceh Province on 2016, the populations obtained are 2,717 constructors. By using Slovin Equation, the research samples obtained are 97 contractors. The most dominant factors in underestimate cost offer risk of the road construction projects in Aceh Province is Contingency Cost Factor which the mean is 4.374.
Track inspection planning and risk measurement analysis.
DOT National Transportation Integrated Search
2014-11-01
This project models track inspection operations on a railroad network and discusses how the inspection results can : be used to measure the risk of failure on the tracks. In particular, the inspection times of the tracks, inspection frequency of the ...
Changes of flood risk on the northern foothills of the Tatra Mountains
NASA Astrophysics Data System (ADS)
Kundzewicz, Z. W.; Stoffel, M.; Wyżga, B.; Ruiz-Villanueva, V.; Niedźwiedź, T.; Kaczka, R.; Ballesteros-Cánovas, J. A.; Pińskwar, I.; Łupikasza, E.; Zawiejska, J.; Mikuś, P.; Choryński, A.; Hajdukiewicz, H.; Spyt, B.; Janecka, K.
2017-08-01
The present paper reviews selected outcomes of the FLORIST project devoted to flood risk in the region of the northern foothills of the Tatra Mountains in Poland and summarizes novel results. The project encompassed theoretical, field, and modeling work. It was focused around observation-based hydroclimatology; projections for the future; dendrogeomorphology; as well as influence of transport of large wood on fluvial processes. The project improved understanding and interpreting changes in high-flow frequency and magnitude as well as changes in flood risk in the region, related to the presence of large wood in mountain streams. A unique database on past episodes of intense precipitation and flooding was created, harnessing multiple sources. The project showed that the analysis of tree rings and wood logs can offer useful information, complementing and considerably enriching the knowledge of river floods in the region of northern foothills of the Tatra Mountains. Retrospective and scenario-defined modeling of selected past fluvial events in the region was also performed.
NASA Astrophysics Data System (ADS)
Congi, Maria Pia; Campo, Valentina; Cipolloni, Carlo; Delmonaco, Giuseppe; Guerrieri, Luca; Iadanza, Carla; Spizzichino, Daniele; Trigila, Alessandro
2014-05-01
The increasing damage caused by natural disasters in the last decades points out the need for interoperable added-value services to support environmental safety and human protection, by reducing vulnerability of exposed elements as well as improving the resilience of the involved communities. For this reason, to provide access to harmonized and customized data is only one of several steps towards delivering adequate support to risk assessment, reduction and management. Scope of the present work is to illustrate a methodology under development for analysis of potential impacts in areas prone to landslide hazard in the framework of the EC project LIFE+IMAGINE. The project aims to implement an infrastructure based on web services for environmental analysis, that integrates in its own architecture specifications and results from INSPIRE, SEIS and GMES. Existing web services will be customized during the project to provide functionalities for supporting the environmental integrated management. The implemented infrastructure will be applied to landslide risk scenarios, to be developed in selected pilot areas, aiming at: i) application of standard procedures to implement a landslide risk analysis; ii) definition of a procedure for assessment of potential environmental impacts, based on a set of indicators to estimate the different exposed elements with their specific vulnerability in the pilot area. More in detail, the landslide pilot will be aimed at providing a landslide risk scenario through the implementation and analysis of: 1) a landslide inventory from available historical databases and maps; 2) landslide susceptibility and hazard maps; 3) assessment of exposure and vulnerability on selected typologies of elements at risk; 4) implementation of a landslide risk scenario for different sets of exposed elements (e.g. population, road network, residential area, cultural heritage). The pilot will be implemented in Liguria, Italy, in two different catchment areas located in the Cinque Terre National Park, characterized by a high landslide susceptibility and low resilience, being highly vulnerable to landslides induced by heavy rainfall. The landslide risk impact analysis will be calibrated taking into account the socio-economic damage caused by landslides triggered by the October 2011 meteorological event. Most of landslides affected the diffuse system of anthropogenic terraces and caused the direct disruption of the walls as well as transportation of a large amount of loose sediments along the slopes and channels as induced consequence of the event. The final target of the landslide risk assessment scenario will be to improve the knowledge and awareness on hazard, exposure, vulnerability and landslide risk in the Cinque Terre National Park to the benefit of local authorities and population. In addition, the results of the application can have a practical and positive effects for i.e. i) updating the land planning process in order to improve the resilience of local communities, ii) implementing preliminary cost-benefit analysis aimed at the definition of guidelines for sustainable landslide risk mitigation strategies, iii) suggesting a general road map for the implementation of a local adaptation plan.
Tropical Airborne LiDAR for Landslide Assessment in Malaysia: a technical perspective
NASA Astrophysics Data System (ADS)
Abd Manap, Mohamad; Azhari Razak, Khamarrul; Mohamad, Zakaria; Ahmad, Azhari; Ahmad, Ferdaus; Mohamad Zin, Mazlan; A'zad Rosle, Qalam
2015-04-01
Malaysia has faced a substantial number of landslide events every year. Cameron Highlands, Pahang is one of the badly areas affected by slope failures characterized by extreme climate, rugged topographic and weathered geological structures in a tropical environment. A high frequency of landslide occurrence in the hilly areas is predominantly due to the geological materials, tropical monsoon seasons and uncontrolled agricultural activities. Therefore the Government of Malaysia through the Prime Minister Department has allocated a special budget to conduct national level hazard and risk mapping project through Minerals and Geoscience Department Malaysia, the Ministry of Natural Resources and Environment. The primary aim of this project is to provide slope hazard risk information for a better slope management in Malaysia. In addition this project will establish national infrastructure for geospatial information on the geological terrain and slope by emphasizing the disaster risk throughout the country. The areas of interest are located in the three different selected areas i.e. Cameron Highlands (275 square kilometers), Ipoh (200 square kilometers) and Cheras Kajang -- Batang kali (650 square kilometers). These areas are selected based on National Slope Master Plan (2009 -- 2023) that endorsed by Malaysia Government Cabinet. The national hazard and risk mapping project includes six parts of major tasks: (1) desk study and mobilization, (2) airborne LiDAR data acquisition and analysis, (3) field data acquisition and verification, (4) hazard and risk for natural terrain, (5) hazard and risk analysis for man-made slope and (6) Man-made slope mitigation/preventive measures. The project was authorized in September, 2014 and will be ended in March, 2016. In this paper, the main focus is to evaluate the suitability of integrated capability of airborne- and terrestrial LiDAR data acquisition and analysis, and also digital photography for regional landslide assessment. The results of the study produced 4 point/m2 density of LiDAR data point cloud, very detailed DEM and DSM of 0.5 m grid and high resolution digital aerial photograph of 7 cm grid, as well as an inventory of the landslide. A reliable landslide inventory has been critically developed with the input of LIDAR derivatives data and field investigation emphasizing on its crucial attributes, e.g., the landslide types, depth, style-, states and distribution of landslide activity. As a result of this study, guidelines and recommendation on the technical aspect of LIDAR-derived landslide assessment are explicitly presented and critically discussed. The finding of this project will be very useful for future planning of slope management, sustainable land use planning and development by related government agencies and local authorities in Malaysia. Keywords: Airborne LiDAR; landslide assessment; hazard and risk analysis; 3D point cloud density; slope failures; Malaysia
Correlation of Spacecraft Mission and Project Costs
NASA Technical Reports Server (NTRS)
Swan, Christopher; Jarrett, Shawn
2007-01-01
A key component of any cost risk analysis is the level of correlation between individual elements of cost. This analysis supplements the available historical records with the cost estimates from the JPL Advanced Design Team. The costs from actual JPL flight projects are then used to validate the results, clearly indicating that, on average, the correlation between elements of cost is between 0.4 and 0.7.
ERIC Educational Resources Information Center
Miller, T. E.; Herreid, C. H.
2008-01-01
This article presents a project intended to produce a model for predicting the risk of attrition of individual students enrolled at the University of South Florida. The project is premised upon the principle that college student attrition is as highly individual and personal as any other aspect of the college-going experience. Students make…
NASA Astrophysics Data System (ADS)
Kawamoto, Shigeru; Ikeda, Yuichi; Fukui, Chihiro; Tateshita, Fumihiko
Private finance initiative is a business scheme that materializes social infrastructure and public services by utilizing private-sector resources. In this paper we propose a new method to optimize capital structure, which is the ratio of capital to debt, and senior-sub structure, which is the ratio of senior loan to subordinated loan, for private finance initiative. We make the quantitative analysis of a private finance initiative's project using the proposed method. We analyze trade-off structure between risk and return in the project, and optimize capital structure and senior-sub structure. The method we propose helps to improve financial stability of the project, and to make a fund raising plan that is expected to be reasonable for project sponsor and moneylender.
Barzyk, Timothy M.; Wilson, Sacoby; Wilson, Anthony
2015-01-01
Community, state, and federal approaches to conventional and cumulative risk assessment (CRA) were described and compared to assess similarities and differences, and develop recommendations for a consistent CRA approach, acceptable across each level as a rigorous scientific methodology, including partnership formation and solution development as necessary practices. Community, state, and federal examples were described and then summarized based on their adherence to CRA principles of: (1) planning, scoping, and problem formulation; (2) risk analysis and ranking, and (3) risk characterization, interpretation, and management. While each application shared the common goal of protecting human health and the environment, they adopted different approaches to achieve this. For a specific project-level analysis of a particular place or instance, this may be acceptable, but to ensure long-term applicability and transferability to other projects, recommendations for developing a consistent approach to CRA are provided. This approach would draw from best practices, risk assessment and decision analysis sciences, and historical lessons learned to provide results in an understandable and accepted manner by all entities. This approach is intended to provide a common ground around which to develop CRA methods and approaches that can be followed at all levels. PMID:25918910
NASA Technical Reports Server (NTRS)
Dudzinski, Leonard a.; Pencil, Eric J.; Dankanich, John W.
2007-01-01
The In-Space Propulsion Technology Project (ISPT) is currently NASA's sole investment in electric propulsion technologies. This project is managed at NASA Glenn Research Center (GRC) for the NASA Headquarters Science Mission Directorate (SMD). The objective of the electric propulsion project area is to develop near-term and midterm electric propulsion technologies to enhance or enable future NASA science missions while minimizing risk and cost to the end user. Systems analysis activities sponsored by ISPT seek to identify future mission applications in order to quantify mission requirements, as well as develop analytical capability in order to facilitate greater understanding and application of electric propulsion and other propulsion technologies in the ISPT portfolio. These analyses guide technology investments by informing decisions and defining metrics for technology development to meet identified mission requirements. This paper discusses the missions currently being studied for electric propulsion by the ISPT project, and presents the results of recent electric propulsion (EP) mission trades. Recent ISPT systems analysis activities include: an initiative to standardize life qualification methods for various electric propulsion systems in order to retire perceived risk to proposed EP missions; mission analysis to identify EP requirements from Discovery, New Frontiers, and Flagship classes of missions; and an evaluation of system requirements for radioisotope-powered electric propulsion. Progress and early results of these activities is discussed where available.
Driver distraction : eye glance analysis and conversation workload.
DOT National Transportation Integrated Search
2015-11-01
The objective of this project was to assess the risk of performing a secondary task while driving a commercial : motor vehicle (CMV). The risk of conversation workload while driving a CMV was also assessed. Conversation : workload is a proxy for cogn...
The safer clinical systems project in renal care.
Weale, Andy R
2013-09-01
Current systems in place in healthcare are designed to detect harm after it has happened (e.g critical incident reports) and make recommendations based on an assessment of that event. Safer Clinical Systems, a Health Foundation funded project, is designed to proactively search for risk within systems, rather than being reactive to harm. The aim of the Safer Clinical Systems project in Renal Care was to reduce the risks associated with shared care for patients who are undergoing surgery but are looked after peri-operatively by nephrology teams on nephrology wards. This report details our findings of the diagnostic phase of Safer Clinical Systems: the proactive search for risk. We have evaluated the current system of care using a set of risk evaluation and process mapping tools (Failure Modes and Effects Analysis (FMEA) and Hierarchical Task Analysis HTA). We have engaged staff with the process mapping and risk assessment tools. We now understand our system and understand where the highest risk tasks are undertaken during a renal in-patient stay during which a patient has an operation. These key tasks occur across the perioperaive period and are not confined to one aspect of care. A measurement strategy and intervention plan have been designed around these tasks. Safer Clinical Systems has identified high risk, low reliability tasks in our system. We look forward to fully reporting these data in 2014. © 2013 European Dialysis and Transplant Nurses Association/European Renal Care Association.
Contribution of European research to risk analysis.
Boenke, A
2001-12-01
The European Commission's, Quality of Life Research Programme, Key Action 1-Health, Food & Nutrition is mission-oriented and aims, amongst other things, at providing a healthy, safe and high-quality food supply leading to reinforced consumer confidence in the safety, of European food. Its objectives also include the enhancing of the competitiveness of the European food supply. Key Action 1 is currently supporting a number of different types of European collaborative projects in the area of risk analysis. The objectives of these projects range from the development and validation of prevention strategies including the reduction of consumers risks; development and validation of new modelling approaches, harmonization of risk assessment principles methodologies and terminology; standardization of methods and systems used for the safety evaluation of transgenic food; providing of tools for the evaluation of human viral contamination of shellfish and quality control; new methodologies for assessing the potential of unintended effects of genetically modified (genetically modified) foods; development of a risk assessment model for Cryptosporidium parvum related to the food and water industries, to the development of a communication platform for genetically modified organism, producers, retailers, regulatory authorities and consumer groups to improve safety assessment procedures, risk management strategies and risk communication; development and validation of new methods for safety testing of transgenic food; evaluation of the safety and efficacy of iron supplementation in pregnant women, evaluation of the potential cancer-preventing activity of pro- and pre-biotic ('synbiotic') combinations in human volunteers. An overview of these projects is presented here.
NASA Astrophysics Data System (ADS)
Magilligan, F. J.; Goldstien, P.
2011-12-01
River restoration projects with the goal of restoring a wide range of morphologic and ecologic channel processes and functions have become common. The complex interactions between flow and sediment-transport make it challenging to design river channels that are both self-sustaining and improve ecosystem function. The relative immaturity of the field of river restoration and shortcomings in existing methodologies for evaluating channel designs contribute to this problem, often leading to project failures. The call for increased monitoring of constructed channels to evaluate which restoration techniques do and do not work is ubiquitous and may lead to improved channel restoration projects. However, an alternative approach is to detect project flaws before the channels are built by using numerical models to simulate hydraulic and sediment-transport processes and habitat in the proposed channel (Restoration Design Analysis). Multi-dimensional models provide spatially distributed quantities throughout the project domain that may be used to quantitatively evaluate restoration designs for such important metrics as (1) the change in water-surface elevation which can affect the extent and duration of floodplain reconnection, (2) sediment-transport and morphologic change which can affect the channel stability and long-term maintenance of the design; and (3) habitat changes. These models also provide an efficient way to evaluate such quantities over a range of appropriate discharges including low-probability events which often prove the greatest risk to the long-term stability of restored channels. Currently there are many free and open-source modeling frameworks available for such analysis including iRIC, Delft3D, and TELEMAC. In this presentation we give examples of Restoration Design Analysis for each of the metrics above from projects on the Russian River, CA and the Kootenai River, ID. These examples demonstrate how detailed Restoration Design Analysis can be used to guide design elements and how this method can point out potential stability problems or other risks before designs proceed to the construction phase.
Early Identification of SE-Related Program Risks
2009-09-30
development of feasibility evidence for a 100-KSLOC project . It is good to note that the “sweet spots” are... models , or experiments with planned technologies and increasingly detailed analysis of development approaches and project productivity rates. The ...incomplete without the FED, it becomes a first-class project deliverable. This implies that it needs a plan for its development , and that each task
Initial Risk Analysis and Decision Making Framework
DOE Office of Scientific and Technical Information (OSTI.GOV)
Engel, David W.
2012-02-01
Commercialization of new carbon capture simulation initiative (CCSI) technology will include two key elements of risk management, namely, technical risk (will process and plant performance be effective, safe, and reliable) and enterprise risk (can project losses and costs be controlled within the constraints of market demand to maintain profitability and investor confidence). Both of these elements of risk are incorporated into the risk analysis subtask of Task 7. Thus far, this subtask has developed a prototype demonstration tool that quantifies risk based on the expected profitability of expenditures when retrofitting carbon capture technology on a stylized 650 MW pulverized coalmore » electric power generator. The prototype is based on the selection of specific technical and financial factors believed to be important determinants of the expected profitability of carbon capture, subject to uncertainty. The uncertainty surrounding the technical performance and financial variables selected thus far is propagated in a model that calculates the expected profitability of investments in carbon capture and measures risk in terms of variability in expected net returns from these investments. Given the preliminary nature of the results of this prototype, additional work is required to expand the scope of the model to include additional risk factors, additional information on extant and proposed risk factors, the results of a qualitative risk factor elicitation process, and feedback from utilities and other interested parties involved in the carbon capture project. Additional information on proposed distributions of these risk factors will be integrated into a commercial implementation framework for the purpose of a comparative technology investment analysis.« less
Risk Management Implementation Tool
NASA Technical Reports Server (NTRS)
Wright, Shayla L.
2004-01-01
Continuous Risk Management (CM) is a software engineering practice with processes, methods, and tools for managing risk in a project. It provides a controlled environment for practical decision making, in order to assess continually what could go wrong, determine which risk are important to deal with, implement strategies to deal with those risk and assure the measure effectiveness of the implemented strategies. Continuous Risk Management provides many training workshops and courses to teach the staff how to implement risk management to their various experiments and projects. The steps of the CRM process are identification, analysis, planning, tracking, and control. These steps and the various methods and tools that go along with them, identification, and dealing with risk is clear-cut. The office that I worked in was the Risk Management Office (RMO). The RMO at NASA works hard to uphold NASA s mission of exploration and advancement of scientific knowledge and technology by defining and reducing program risk. The RMO is one of the divisions that fall under the Safety and Assurance Directorate (SAAD). I worked under Cynthia Calhoun, Flight Software Systems Engineer. My task was to develop a help screen for the Continuous Risk Management Implementation Tool (RMIT). The Risk Management Implementation Tool will be used by many NASA managers to identify, analyze, track, control, and communicate risks in their programs and projects. The RMIT will provide a means for NASA to continuously assess risks. The goals and purposes for this tool is to provide a simple means to manage risks, be used by program and project managers throughout NASA for managing risk, and to take an aggressive approach to advertise and advocate the use of RMIT at each NASA center.
Risk management analysis for construction of Kutai Kartanegara bridge-East Kalimantan-Indonesia
NASA Astrophysics Data System (ADS)
Azis, Subandiyah
2017-11-01
Many sources of risk that may impede the achievement of the project objectives through either cost or quality and time, especially for bridges that have collapsed before, so when the implementation of possible hazard / high hazard so when should the possible hazard/high hazard be implemented The purpose of this research is to identify, to analyze risks by classifying the risks using the method of Risk Breakdown Structure (RBS) and managing the dominant risk of execution of the installation work to determine the handling of the steel frame in order to maximize the positive and minimize the incidence of adverse events. The results of this study indicate there are 15 sources of risks are identified, and there are 6 risk indicates the dominant risks. Mitigation performed on the dominant risks unacceptable i.e. Project factor that shows the delays in the arrival of materials due to locations, schedule of the arrival of materials should be tailored to the needs of the field and the amount of material that comes with the required field should also be evaluated. The result is expected to be a guideline for identifying risks and mitigation measures for further research. Subsequent researchers to pay attention on the security factor that implementation time does not affect the productivity of work in construction projects.
Enhanced project management tool
NASA Technical Reports Server (NTRS)
Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Maluf, David A. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)
2012-01-01
A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.
REDARS 2 demonstration project for seismic risk analysis of highway systems.
DOT National Transportation Integrated Search
2006-06-01
Effects of earthquake damage to highway components such as bridges and roadways can go well beyond life-safety risks and costs to repair damaged structures. Such damage can also severely disrupt traffic flows that can : impact the regions economy ...
the management of blade test projects. He also works with the NREL Marine Hydrokinetic group in the areas of risk management and failure analysis. David is a registered Professional Engineer in Arizona within the discipline of mechanical engineering; he is also a certified Project Management Professional
Steinmann, Peter; Keiser, Jennifer; Bos, Robert; Tanner, Marcel; Utzinger, Jürg
2006-07-01
An estimated 779 million people are at risk of schistosomiasis, of whom 106 million (13.6%) live in irrigation schemes or in close proximity to large dam reservoirs. We identified 58 studies that examined the relation between water resources development projects and schistosomiasis, primarily in African settings. We present a systematic literature review and meta-analysis with the following objectives: (1) to update at-risk populations of schistosomiasis and number of people infected in endemic countries, and (2) to quantify the risk of water resources development and management on schistosomiasis. Using 35 datasets from 24 African studies, our meta-analysis showed pooled random risk ratios of 2.4 and 2.6 for urinary and intestinal schistosomiasis, respectively, among people living adjacent to dam reservoirs. The risk ratio estimate for studies evaluating the effect of irrigation on urinary schistosomiasis was in the range 0.02-7.3 (summary estimate 1.1) and that on intestinal schistosomiasis in the range 0.49-23.0 (summary estimate 4.7). Geographic stratification showed important spatial differences, idiosyncratic to the type of water resources development. We conclude that the development and management of water resources is an important risk factor for schistosomiasis, and hence strategies to mitigate negative effects should become integral parts in the planning, implementation, and operation of future water projects.
Efficient and Flexible Climate Analysis with Python in a Cloud-Based Distributed Computing Framework
NASA Astrophysics Data System (ADS)
Gannon, C.
2017-12-01
As climate models become progressively more advanced, and spatial resolution further improved through various downscaling projects, climate projections at a local level are increasingly insightful and valuable. However, the raw size of climate datasets presents numerous hurdles for analysts wishing to develop customized climate risk metrics or perform site-specific statistical analysis. Four Twenty Seven, a climate risk consultancy, has implemented a Python-based distributed framework to analyze large climate datasets in the cloud. With the freedom afforded by efficiently processing these datasets, we are able to customize and continually develop new climate risk metrics using the most up-to-date data. Here we outline our process for using Python packages such as XArray and Dask to evaluate netCDF files in a distributed framework, StarCluster to operate in a cluster-computing environment, cloud computing services to access publicly hosted datasets, and how this setup is particularly valuable for generating climate change indicators and performing localized statistical analysis.
Developing risk-based priorities for reducing air pollution in urban settings in Ukraine.
Brody, Michael; Caldwell, Jane; Golub, Alexander
2007-02-01
Ukraine, when part of the former Soviet Union, was responsible for about 25% of its overall industrial production. This aging industrial infrastructure continues to emit enormous volumes of air and water pollution and wastes. The National Report on the State of Environment in Ukraine 1999 (Ukraine Ministry of Environmental Protection [MEP], 2000) shows significant air pollution. There are numerous emissions that have been associated with developmental effects, chronic long-term health effects, and cancer. Ukraine also has been identified as a major source of transboundary air pollution for the eastern Mediterranean region. Ukraine's Environment Ministry is not currently able to strategically target high-priority emissions and lacks the resources to address all these problems. For these reasons, the U.S. Environmental Protection Agency set up a partnership with Ukraine's Ministry of Environmental Protection to strengthen its capacity to set environmental priorities through the use of comparative environmental risk assessment and economic analysis--the Capacity Building Project. The project is also addressing improvements in the efficiency and effectiveness of the use of its National Environmental Protection Fund. The project consists of a series of workshops with Ukrainian MEP officials in comparative risk assessment of air pollutant emissions in several heavily industrialized oblasts; cost-benefit and cost-effectiveness analysis; and environmental finance. Pilot risk assessment analyses have been completed. At the end of the Capacity Building Project it is expected that the use of the National Environmental Protection fund and the regional level oblast environmental protection funds will begin to target and identify the highest health and environmental risk emissions.
Cook, Michael B.; Guénel, Pascal; Gapstur, Susan M.; van den Brandt, Piet A.; Michels, Karin B.; Casagrande, John T.; Cooke, Rosie; Van Den Eeden, Stephen K.; Ewertz, Marianne; Falk, Roni T.; Gaudet, Mia M.; Gkiokas, George; Habel, Laurel A.; Hsing, Ann W.; Johnson, Kenneth; Kolonel, Laurence N.; La Vecchia, Carlo; Lynge, Elsebeth; Lubin, Jay H.; McCormack, Valerie A.; Negri, Eva; Olsson, Håkan; Parisi, Dominick; Petridou, Eleni Th.; Riboli, Elio; Sesso, Howard D.; Swerdlow, Anthony; Thomas, David B.; Willett, Walter C.; Brinton, Louise A.
2015-01-01
Background The etiology of male breast cancer is poorly understood, partly due to its relative rarity. Although tobacco and alcohol exposures are known carcinogens, their association with male breast cancer risk remains ill-defined. Methods The Male Breast Cancer Pooling Project consortium provided 2,378 cases and 51,959 controls for analysis from 10 case-control and 10 cohort studies. Individual participant data were harmonized and pooled. Unconditional logistic regression was used to estimate study design-specific (case-control/cohort) odds ratios (OR) and 95% confidence intervals (CI), which were then combined using fixed effects meta-analysis. Results Cigarette smoking status, smoking pack-years, duration, intensity, and age at initiation were not associated with male breast cancer risk. Relations with cigar and pipe smoking, tobacco chewing, and snuff use were also null. Recent alcohol consumption and average grams of alcohol consumed per day were also not associated with risk; only one sub-analysis of very high recent alcohol consumption (>60 grams/day) was tentatively associated with male breast cancer (ORunexposed referent=1.29, 95%CI:0.97–1.71; OR>0–<7 g/day referent=1.36, 95%CI:1.04–1.77). Specific alcoholic beverage types were not associated with male breast cancer. Relations were not altered when stratified by age or body mass index. Conclusions In this analysis of the Male Breast Cancer Pooling Project we found little evidence that tobacco and alcohol exposures were associated with risk of male breast cancer. Impact Tobacco and alcohol do not appear to be carcinogenic for male breast cancer. Future studies should aim to assess these exposures in relation to subtypes of male breast cancer. PMID:25515550
Geo-hazard harmonised data a driven process to environmental analysis system
NASA Astrophysics Data System (ADS)
Cipolloni, Carlo; Iadanza, Carla; Pantaloni, Marco; Trigila, Alessandro
2015-04-01
In the last decade an increase of damage caused by natural disasters has been recorded in Italy. To support environmental safety and human protection, by reducing vulnerability of exposed elements as well as improving the resilience of the involved communities, it need to give access to harmonized and customized data that is one of several steps towards delivering adequate support to risk assessment, reduction and management. In this contest has been developed SEIS and Copernicus-GEMES as infrastructure based on web services for environmental analysis, to integrates in its own system specifications and results from INSPIRE. The two landslide risk scenarios developed in different European projects driven the harmonization process of data that represents the basic element to have interoperable web services in environmental analysis system. From two different perspective we have built a common methodology to analyse dataset and transform them into INSPIRE compliant format following the Data Specification on Geology and on Natural Risk Zone given by INSPIRE. To ensure the maximum results and re-usability of data we have also applied to the landslide and geological datasets a wider Data model standard like GeoSciML, that represents the natural extension of INSPIRE data model to provide more information. The aim of this work is to present the first results of two projects concerning the data harmonisation process, where an important role is played by the semantic harmonisation using the ontology service and/or the hierarchy vocabularies available as Link Data or Link Open Data by means of URI directly in the data spatial services. It will be presented how the harmonised web services can provide an add value in a risk scenario analysis system, showing the first results of the landslide environmental analysis developed by the eENVplus and LIFE+IMAGINE projects.
Integrating Human Factors into Space Vehicle Processing for Risk Management
NASA Technical Reports Server (NTRS)
Woodbury, Sarah; Richards, Kimberly J.
2008-01-01
This presentation will discuss the multiple projects performed in United Space Alliance's Human Engineering Modeling and Performance (HEMAP) Lab, improvements that resulted from analysis, and the future applications of the HEMAP Lab for risk assessment by evaluating human/machine interaction and ergonomic designs.
High Resolution Hydro-climatological Projections for Western Canada
NASA Astrophysics Data System (ADS)
Erler, Andre Richard
Accurate identification of the impact of global warming on water resources and hydro-climatic extremes represents a significant challenge to the understanding of climate change on the regional scale. Here an analysis of hydro-climatic changes in western Canada is presented, with specific focus on the Fraser and Athabasca River basins and on changes in hydro-climatic extremes. The analysis is based on a suite of simulations designed to characterize internal variability, as well as model uncertainty. A small ensemble of Community Earth System Model version 1 (CESM1) simulations was employed to generate global climate projections, which were downscaled to 10 km resolution using the Weather Research and Forecasting model (WRF V3.4.1) with several sets of physical parameterizations. Downscaling was performed for a historical validation period and a mid- and end-21st-century projection period, using the RCP8.5 greenhouse gas trajectory. Daily station observations and monthly gridded datasets were used for validation. Changes in hydro-climatic extremes are characterized using Extreme Value Analysis. A novel method of aggregating data from climatologically similar stations was employed to increase the statistical power of the analysis. Changes in mean and extreme precipitation are found to differ strongly between seasons and regions, but (relative) changes in extremes generally follow changes in the (seasonal) mean. At the end of the 21st century, precipitation and precipitation extremes are projected to increase by 30% at the coast in fall and land-inwards in winter, while the projected increase in summer precipitation is smaller and changes in extremes are often not statistically significant. Reasons for the differences between seasons, the role of precipitation recycling in atmospheric water transport, and the sensitivity to physics parameterizations are discussed. Major changes are projected for the Fraser River basin, including earlier snowmelt and a 50% reduction in peak runoff. Combined with higher evapotranspiration, a significant increase in late summer drought risk is likely, but increasing fall precipitation might also increase the risk of moderate flooding. In the Athabasca River basin, increasing winter precipitation and snowmelt is balanced by increasing evapotranspiration in summer and no significant change in flood or drought risk is projected.
Data collection and analysis for local roadway safety assessment.
DOT National Transportation Integrated Search
2014-11-01
The project Data Analysis for Local Roadway : Assessment conducted systematic road-safety : assessment and identified major risks that can be el : iminated or reduced by pr : actical road-improvement : measures. Specifically, the primary task o...
Space Mission Human Reliability Analysis (HRA) Project
NASA Technical Reports Server (NTRS)
Boyer, Roger
2014-01-01
The purpose of the Space Mission Human Reliability Analysis (HRA) Project is to extend current ground-based HRA risk prediction techniques to a long-duration, space-based tool. Ground-based HRA methodology has been shown to be a reasonable tool for short-duration space missions, such as Space Shuttle and lunar fly-bys. However, longer-duration deep-space missions, such as asteroid and Mars missions, will require the crew to be in space for as long as 400 to 900 day missions with periods of extended autonomy and self-sufficiency. Current indications show higher risk due to fatigue, physiological effects due to extended low gravity environments, and others, may impact HRA predictions. For this project, Safety & Mission Assurance (S&MA) will work with Human Health & Performance (HH&P) to establish what is currently used to assess human reliabiilty for human space programs, identify human performance factors that may be sensitive to long duration space flight, collect available historical data, and update current tools to account for performance shaping factors believed to be important to such missions. This effort will also contribute data to the Human Performance Data Repository and influence the Space Human Factors Engineering research risks and gaps (part of the HRP Program). An accurate risk predictor mitigates Loss of Crew (LOC) and Loss of Mission (LOM).The end result will be an updated HRA model that can effectively predict risk on long-duration missions.
Hydrotreater/Distillation Column Hazard Analysis Report Rev. 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lowry, Peter P.; Wagner, Katie A.
This project Hazard and Risk Analysis Report contains the results of several hazard analyses and risk assessments. An initial assessment was conducted in 2012, which included a multi-step approach ranging from design reviews to a formal What-If hazard analysis. A second What-If hazard analysis was completed during February 2013 to evaluate the operation of the hydrotreater/distillation column processes to be installed in a process enclosure within the Process Development Laboratory West (PDL-West) facility located on the PNNL campus. The qualitative analysis included participation of project and operations personnel and applicable subject matter experts. The analysis identified potential hazardous scenarios, eachmore » based on an initiating event coupled with a postulated upset condition. The unmitigated consequences of each hazardous scenario were generally characterized as a process upset; the exposure of personnel to steam, vapors or hazardous material; a spray or spill of hazardous material; the creation of a flammable atmosphere; or an energetic release from a pressure boundary.« less
NASA Astrophysics Data System (ADS)
DELİCE, Yavuz
2015-04-01
Highways, Located in the city and intercity locations are generally prone to many kind of natural disaster risks. Natural hazards and disasters that may occur firstly from highway project making to construction and operation stages and later during the implementation of highway maintenance and repair stages have to be taken into consideration. And assessment of risks that may occur against adverse situations is very important in terms of project design, construction, operation maintenance and repair costs. Making hazard and natural disaster risk analysis is largely depending on the definition of the likelihood of the probable hazards on the highways. However, assets at risk , and the impacts of the events must be examined and to be rated in their own. With the realization of these activities, intended improvements against natural hazards and disasters will be made with the utilization of Failure Mode Effects Analysis (FMEA) method and their effects will be analyzed with further works. FMEA, is a useful method to identify the failure mode and effects depending on the type of failure rate effects priorities and finding the most optimum economic and effective solution. Although relevant measures being taken for the identified risks by this analysis method , it may also provide some information for some public institutions about the nature of these risks when required. Thus, the necessary measures will have been taken in advance in the city and intercity highways. Many hazards and natural disasters are taken into account in risk assessments. The most important of these dangers can be listed as follows; • Natural disasters 1. Meteorological based natural disasters (floods, severe storms, tropical storms, winter storms, avalanches, etc.). 2. Geological based natural disasters (earthquakes, tsunamis, landslides, subsidence, sinkholes, etc) • Human originated disasters 1. Transport accidents (traffic accidents), originating from the road surface defects (icing, signaling caused malfunctions and risks), fire or explosion etc.- In this study, with FMEA method, risk analysis of the urban and intercity motorways against natural disasters and hazards have been performed and found solutions were brought against these risks. Keywords: Failure Modes Effects Analysis (FMEA), Pareto Analyses (PA), Highways, Risk Management.
Chadès, Iadine
2017-01-01
Environmental impact assessment (EIA) is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN) to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection. PMID:28686651
Nicol, Sam; Chadès, Iadine
2017-01-01
Environmental impact assessment (EIA) is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN) to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Copping, Andrea E.; Hanna, Luke A.
2011-11-01
Potential environmental effects of offshore wind (OSW) energy development are not well understood, and yet regulatory agencies are required to make decisions in spite of substantial uncertainty about environmental impacts and their long-term consequences. An understanding of risks associated with interactions between OSW installations and avian and aquatic receptors, including animals, habitats, and ecosystems, can help define key uncertainties and focus regulatory actions and scientific studies on interactions of most concern. During FY 2011, Pacific Northwest National Laboratory (PNNL) scientists adapted and applied the Environmental Risk Evaluation System (ERES), first developed to examine the effects of marine and hydrokinetic energymore » devices on aquatic environments, to offshore wind development. PNNL scientists conducted a risk screening analysis on two initial OSW cases: a wind project in Lake Erie and a wind project off the Atlantic coast of the United States near Atlantic City, New Jersey. The screening analysis revealed that top-tier stressors in the two OSW cases were the dynamic effects of the device (e.g., strike), accidents/disasters, and effects of the static physical presence of the device, such as alterations in bottom habitats. Receptor interactions with these stressors at the highest tiers of risk were dominated by threatened and endangered animals. Risk to the physical environment from changes in flow regime also ranked high. Peer review of this process and results will be conducted during FY 2012. The ERES screening analysis provides an assessment of the vulnerability of environmental receptors to stressors associated with OSW installations; a probability analysis is needed to determine specific risk levels to receptors. As more data become available that document effects of offshore wind farms on specific receptors in U.S. coastal and Great Lakes waters, probability analyses will be performed.« less
Karl, J Bradley; Medders, Lorilee A; Maroney, Patrick F
2016-06-01
We examine whether the risk characterization estimated by catastrophic loss projection models is sensitive to the revelation of new information regarding risk type. We use commercial loss projection models from two widely employed modeling firms to estimate the expected hurricane losses of Florida Atlantic University's building stock, both including and excluding secondary information regarding hurricane mitigation features that influence damage vulnerability. We then compare the results of the models without and with this revealed information and find that the revelation of additional, secondary information influences modeled losses for the windstorm-exposed university building stock, primarily evidenced by meaningful percent differences in the loss exceedance output indicated after secondary modifiers are incorporated in the analysis. Secondary risk characteristics for the data set studied appear to have substantially greater impact on probable maximum loss estimates than on average annual loss estimates. While it may be intuitively expected for catastrophe models to indicate that secondary risk characteristics hold value for reducing modeled losses, the finding that the primary value of secondary risk characteristics is in reduction of losses in the "tail" (low probability, high severity) events is less intuitive, and therefore especially interesting. Further, we address the benefit-cost tradeoffs that commercial entities must consider when deciding whether to undergo the data collection necessary to include secondary information in modeling. Although we assert the long-term benefit-cost tradeoff is positive for virtually every entity, we acknowledge short-term disincentives to such an effort. © 2015 Society for Risk Analysis.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grabaskas, Dave; Brunett, Acacia J.; Bucknor, Matthew
GE Hitachi Nuclear Energy (GEH) and Argonne National Laboratory are currently engaged in a joint effort to modernize and develop probabilistic risk assessment (PRA) techniques for advanced non-light water reactors. At a high level, the primary outcome of this project will be the development of next-generation PRA methodologies that will enable risk-informed prioritization of safety- and reliability-focused research and development, while also identifying gaps that may be resolved through additional research. A subset of this effort is the development of PRA methodologies to conduct a mechanistic source term (MST) analysis for event sequences that could result in the release ofmore » radionuclides. The MST analysis seeks to realistically model and assess the transport, retention, and release of radionuclides from the reactor to the environment. The MST methods developed during this project seek to satisfy the requirements of the Mechanistic Source Term element of the ASME/ANS Non-LWR PRA standard. The MST methodology consists of separate analysis approaches for risk-significant and non-risk significant event sequences that may result in the release of radionuclides from the reactor. For risk-significant event sequences, the methodology focuses on a detailed assessment, using mechanistic models, of radionuclide release from the fuel, transport through and release from the primary system, transport in the containment, and finally release to the environment. The analysis approach for non-risk significant event sequences examines the possibility of large radionuclide releases due to events such as re-criticality or the complete loss of radionuclide barriers. This paper provides details on the MST methodology, including the interface between the MST analysis and other elements of the PRA, and provides a simplified example MST calculation for a sodium fast reactor.« less
Risk and value analysis of SETI
NASA Technical Reports Server (NTRS)
Billingham, J.
1990-01-01
This paper attempts to apply a traditional risk and value analysis to the Search for Extraterrestrial Intelligence--SETI. In view of the difficulties of assessing the probability of success, a comparison is made between SETI and a previous search for extraterrestrial life, the biological component of Project Viking. Our application of simple Utility Theory, given some reasonable assumptions, suggests that SETI is at least as worthwhile as the biological experiment on Viking.
Risk and value analysis of SETI.
Billingham, J
1990-01-01
This paper attempts to apply a traditional risk and value analysis to the Search for Extraterrestrial Intelligence--SETI. In view of the difficulties of assessing the probability of success, a comparison is made between SETI and a previous search for extraterrestrial life, the biological component of Project Viking. Our application of simple Utility Theory, given some reasonable assumptions, suggests that SETI is at least as worthwhile as the biological experiment on Viking.
Carlo Hojilla, J; Koester, Kimberly A; Cohen, Stephanie E; Buchbinder, Susan; Ladzekpo, Deawodi; Matheson, Tim; Liu, Albert Y
2016-07-01
Pre-exposure prophylaxis (PrEP) is a viable HIV prevention strategy but risk compensation could undermine potential benefits. There are limited data that examine this phenomenon outside of clinical trials. We conducted a qualitative analysis of counseling notes from the San Francisco site of the US PrEP demonstration project to assess how men who have sex with men used PrEP as a prevention strategy and its impact on their sexual practices. Four major themes emerged from our analysis of 130 distinct notes associated with 26 participants. Prevention strategy decision-making was dynamic, often influenced by the context and perceived risk of a sexual encounter. Counselors noted that participants used PrEP in conjunction with other health promotion strategies like condoms, asking about HIV status of their sex partners, and seroadaptation. With few exceptions, existing risk reduction strategies were not abandoned upon initiation of PrEP. Risk-taking behavior was 'seasonal' and fluctuations were influenced by various personal, psychosocial, and health-related factors. PrEP also helped relieve anxiety regarding sex and HIV, particularly among serodiscordant partners. Understanding sexual decision-making and how PrEP is incorporated into existing prevention strategies can help inform future PrEP implementation efforts.
Hojilla, J. Carlo; Koester, Kimberly A.; Cohen, Stephanie E.; Buchbinder, Susan; Ladzekpo, Deawodi; Matheson, Tim; Liu, Albert Y
2015-01-01
Pre-exposure prophylaxis (PrEP) is a viable HIV prevention strategy but risk compensation could undermine potential benefits. There are limited data that examine this phenomenon outside of clinical trials. We conducted a qualitative analysis of counseling notes from the San Francisco site of the US PrEP Demonstration Project to assess how men who have sex with men (MSM) used PrEP as a prevention strategy and its impact on their sexual practices. Four major themes emerged from our analysis of 130 distinct notes associated with 26 participants. Prevention strategy decision-making was dynamic, often influenced by the context and perceived risk of a sexual encounter. Counselors noted that participants used PrEP in conjunction with other health promotion strategies like condoms, asking about HIV status of their sex partners, and seroadaptation. With few exceptions, existing risk reduction strategies were not abandoned upon initiation of PrEP. Risk-taking behavior was ‘seasonal’ and fluctuations were influenced by various personal, psychosocial, and health-related factors. PrEP also helped relieve anxiety regarding sex and HIV, particularly among serodiscordant partners. Understanding sexual decision-making and how PrEP is incorporated into existing prevention strategies can help inform future PrEP implementation efforts. PMID:25835463
Schedule Risk Analysis Of Southern Mainway Construction In Jember Regency
NASA Astrophysics Data System (ADS)
Susilo, K.; Wiguna, I. P. A.; Adi, T. J. W.
2017-11-01
In Jember Regency, it has been built Southern Cross Road (JLS) as part of regional project. On the implementation of previous construction, there were still some events which gave negative impact to the project. The purpose of this research is to analyze risk and its effect on schedule at the construction phase of JLS at Jember Regency. Risk identification process is carried out by site survey, literature studies and supporting data. The use of Probability and Impact Matrix were aimed to obtain the level of risk. Based on the analysis, it was obtained six highest risk that could affecting schedule, such as difficult access locations, heavy rains, increases of material price, broken road pavement work, change order, and work accident. Risk responses were proposed by applying agreement to guarantee stock and price of materials, prioritized drainage, and constructing bridge to solve difficult access. An intense coordination in the site, routine checks of quality, manufacturing of retailing walls were also needed to reduce possibility of distruption to pavement work. To avoid work accident, it is needed to socialize about harsh terrain condition, mutual allertness among supervisor, worker and the others, and also all personals must comply with savety rules.
Space Radiation Heart Disease Risk Estimates for Lunar and Mars Missions
NASA Technical Reports Server (NTRS)
Cucinotta, Francis A.; Chappell, Lori; Kim, Myung-Hee
2010-01-01
The NASA Space Radiation Program performs research on the risks of late effects from space radiation for cancer, neurological disorders, cataracts, and heart disease. For mortality risks, an aggregate over all risks should be considered as well as projection of the life loss per radiation induced death. We report on a triple detriment life-table approach to combine cancer and heart disease risks. Epidemiology results show extensive heterogeneity between populations for distinct components of the overall heart disease risks including hypertension, ischaemic heart disease, stroke, and cerebrovascular diseases. We report on an update to our previous heart disease estimates for Heart disease (ICD9 390-429) and Stroke (ICD9 430-438), and other sub-groups using recent meta-analysis results for various exposed radiation cohorts to low LET radiation. Results for multiplicative and additive risk transfer models are considered using baseline rates for US males and female. Uncertainty analysis indicated heart mortality risks as low as zero, assuming a threshold dose for deterministic effects, and projections approaching one-third of the overall cancer risk. Medan life-loss per death estimates were significantly less than that of solid cancer and leukemias. Critical research questions to improve risks estimates for heart disease are distinctions in mechanisms at high doses (>2 Gy) and low to moderate doses (<2 Gy), and data and basic understanding of radiation doserate and quality effects, and individual sensitivity.
Zhang, Limao; Wu, Xianguo; Qin, Yawei; Skibniewski, Miroslaw J; Liu, Wenli
2016-02-01
Tunneling excavation is bound to produce significant disturbances to surrounding environments, and the tunnel-induced damage to adjacent underground buried pipelines is of considerable importance for geotechnical practice. A fuzzy Bayesian networks (FBNs) based approach for safety risk analysis is developed in this article with detailed step-by-step procedures, consisting of risk mechanism analysis, the FBN model establishment, fuzzification, FBN-based inference, defuzzification, and decision making. In accordance with the failure mechanism analysis, a tunnel-induced pipeline damage model is proposed to reveal the cause-effect relationships between the pipeline damage and its influential variables. In terms of the fuzzification process, an expert confidence indicator is proposed to reveal the reliability of the data when determining the fuzzy probability of occurrence of basic events, with both the judgment ability level and the subjectivity reliability level taken into account. By means of the fuzzy Bayesian inference, the approach proposed in this article is capable of calculating the probability distribution of potential safety risks and identifying the most likely potential causes of accidents under both prior knowledge and given evidence circumstances. A case concerning the safety analysis of underground buried pipelines adjacent to the construction of the Wuhan Yangtze River Tunnel is presented. The results demonstrate the feasibility of the proposed FBN approach and its application potential. The proposed approach can be used as a decision tool to provide support for safety assurance and management in tunnel construction, and thus increase the likelihood of a successful project in a complex project environment. © 2015 Society for Risk Analysis.
Sahin, S; Kurum, E
2002-11-01
Environmental Impact Assessment (EIA) is a systematically constructed procedure whereby environmental impacts caused by proposed projects are examined. Geographical Information Systems (GIS) are crucially efficient tools for impact assessment and their use is likely to dramatically increase in the near future. GIS have been applied to a wide range of different impact assessment projects and dams among them have been taken as the case work in this article. EIA Regulation in force in Turkey requires the analysis of steering natural processes that can be adversely affected by the proposed project, particularly in the section of the analysis of the areas with higher landscape value. At this point, the true potential value of GIS lies in its ability to analyze spatial data with accuracy. This study is an attempt to analyze by GIS the areas with higher landscape value in the impact assessment of dam constructions in the case of Seyhan-Köprü Hydroelectric Dam project proposal. A method needs to be defined before the overlapping step by GIS to analyze the areas with higher landscape value. In the case of Seyhan-Köprü Hydroelectric Dam project proposal of the present work, considering the geological conditions and the steep slopes of the area and the type of the project, the most important natural process is erosion. Therefore, the areas of higher erosion risk were considered as the Areas with Higher Landscape Value from the conservation demands points of view.
NASA Astrophysics Data System (ADS)
Ben, R.; Chalaturnyk, R.; Gardner, C.; Hawkes, C.; Johnson, J.; White, D.; Whittaker, S.
2008-12-01
In July 2000, a major research project was initiated to study the geological storage of CO2 as part of a 5000 tonnes/day EOR project planned for the Weyburn Field in Saskatchewan, Canada. Major objectives of the IEA GHG Weyburn CO2 monitoring and storage project included: assessing the integrity of the geosphere encompassing the Weyburn oil pool for effective long-term storage of CO2; monitoring the movement of the injected CO2, and assessing the risk of migration of CO2 from the injection zone (approximately 1500 metres depth) to the surface. Over the period 2000-2004, a diverse group of 80+ researchers worked on: geological, geophysical, and hydrogeological characterizations at both the regional (100 km beyond the field) and detailed scale (10 km around the field); conducted time-lapse geophysical surveys; carried out surface and subsurface geochemical surveys; and undertook numerical reservoir simulations. Results of the characterization were used for a performance assessment that concluded the risk of CO2 movement to the biosphere was very small. By September 2007, more than 14 Mtonnes of CO2 had been injected into the Weyburn reservoir, including approximately 3 Mtonnes recycled from oil production. A "Final Phase" research project was initiated (2007- 2011) to contribute to a "Best Practices" guide for long-term CO2 storage in EOR settings. Research objectives include: improving the geoscience characterization; further detailed analysis and data collection on the role of wellbores; additional geochemical and geophysical monitoring activities; and an emphasis on quantitative risk assessments using multiple analysis techniques. In this talk a review of results from Phase I will be presented followed by plans and initial results for the Final Phase.
The role of Indigenous knowledge in environmental health risk management in Yukon, Canada
Friendship, Katelyn A.; Furgal, Chris M.
2012-01-01
Objectives This project aimed to gain better understandings of northern Indigenous risk perception related to food safety and to identify the role that Indigenous knowledge (IK) plays in risk management processes to support more effective and culturally relevant benefit-risk (B-R) management strategies. Study design The project used an exploratory qualitative case study design to investigate the role and place of IK in the management of environmental contaminants exposure via consumption of traditional foods in Yukon First Nations (YFNs). Methods Forty-one semi-directive interviews with Traditional Food Knowledge Holders and Health and Environment Decision-makers were conducted. A review and analysis of organizational documents related to past risk management events for the issue was conducted. Thematic content analysis was used to analyze transcripts and documents for key themes related to the research question. Results There was a recognized need by all participants for better collaboration between scientists and YFN communities. YFNs have been involved in identifying and defining community concerns about past risk issues, setting a local context, and participating in communications strategies. Interviewees stressed the need to commit adequate time for building relationships, physically being in the community, and facilitating open communication. Conducting community-based projects was identified as critical for collaboration and for cooperative learning and management of these issues. Conclusions The perception of “effective” benefit-risk management is significantly influenced by the efforts made to include local communities in the process. A set of common guiding principles within a process that brings together people and knowledge systems may provide a more effective way forward in cross-cultural, multiple knowledge system contexts for complex benefit-risk issues than a prescriptive rigid framework. PMID:22868192
Fukuda, Hitoshi; Hayashi, Kosuke; Yoshino, Kumiko; Koyama, Takashi; Lo, Benjamin; Kurosaki, Yoshitaka; Yamagata, Sen
2016-03-01
Surgical clipping of ruptured posterior communicating artery (PCoA) aneurysms is a well-established procedure to date. However, preoperative factors associated with procedure-related risk require further elucidation. To investigate the impact of the direction of aneurysm projection on the incidence of procedure-related complications during surgical clipping of ruptured PCoA aneurysms. A total of 65 patients with ruptured PCoA aneurysms who underwent surgical clipping were retrospectively analyzed from a single-center, prospective, observational cohort database in this study. The aneurysms were categorized into lateral and posterior projection groups, depending on direction of the dome. Characteristics and operative findings of each projection group were identified. We also evaluated any correlation of aneurysm projection with the incidence of procedure-related complications. Patients with ruptured PCoA aneurysms with posterior projection more likely presented with good-admission-grade subarachnoid hemorrhage (P = .01, χ test) and were less to also have intracerebral hematoma (P = .01). These aneurysms were found to be associated with higher incidence of intraoperative rupture (P = .02), complex clipping with fenestrated clips (P = .02), and dense adherence to PCoA or its perforators (P = .04) by univariate analysis. Aneurysms with posterior projection were also correlated with procedure-related complications, including postoperative cerebral infarction or hematoma formation (odds ratio, 5.87; 95% confidence interval, 1.11-31.1; P = .04) by multivariable analysis. Ruptured PCoA aneurysms with posterior projection carried a higher risk of procedure-related complications of surgical clipping than those with lateral projection.
Alternative financing sources. ECRI. Emergency Care Research Institute.
1987-01-01
A number of new capital sources have been developed and used by health care institutions unable to finance high-tech projects with equity or conventional tax-exempt debt instruments; these include REITs, MLPs, per-use rentals, venture capital, and banks as brokers. However, there are no magic capital acquisition solutions. Institutions with good credit will continue to find a number of doors open to them; poorer credit risks will have fewer options, and those available will carry greater risk, allow for less provider control over projects, and limit potential return on investment to some extent. It is essential to examine carefully the drawbacks inherent in each type of alternative financing source. Venture capital in particular requires specific analysis because of the wide variety of possible arrangements that exist. If you cannot find either traditional or alternative sources of funding for a proposed project, you should reexamine the project and its underlying utilization projections and reimbursement assumptions.
[Cardiovascular Risk Assessment: preliminary results].
Palmieri, Luigi; Rielli, Rita; Demattè, Luca; Donfrancesco, Chiara; La Terza, Giampaolo; De Sanctis Caiola, Patrizia; Dima, Francesco; Lo Noce, Cinzia; Giannelli, Anna Maria; Brignoli, Ovidio; Cuffari, Alfredo; De Rosa, Marisa; Addis, Antonio; Laurendi, Giovanna; Giampaoli, Simona
2010-02-01
The Italian National Prevention plan includes 10-year cardiovascular risk (CR) assessment of the Italian general population aged 35-69 years using the CUORE Project risk score. A national training program for general practitioners (GPs) was launched by the Ministry of Health in 2003. GPs were encouraged to collect data on risk factors and risk assessment and to contribute to the CUORE Project Cardiovascular Risk Observatory (CRO). The aim of this analysis is to demonstrate the feasibility and effectiveness of risk assessment in primary care. The cuore.exe software, free of charge for GPs and easily downloadable from the CUORE Project web site (www.cuore.iss.it), is the frame for the GP data collection. The CRO provides a platform to analyze data collected on risk assessment and risk factors, and compare results at regional and national level in order to support health policy makers in their decision process. From January 2007 to April 2009, 2858 GPs have downloaded the cuore.exe software; 102,113 risk assessments were sent to the CRO based on risk factors profile of 87,556 persons (3617 persons had more than 1 risk assessment). Mean level of CR was 3.1% in women and 8.4% in men; 30% of men and 65% of women were at low risk (CR < 3%), 9% of men and 0.4% of women were found at high risk (CR > or = 20%). Among those with at least 2 risk assessments, 8% shifted to a lower class of risk after 1 year. Mean level of systolic and diastolic blood pressure decreased by about 1% in 1 year; total cholesterol more than 2%, and prevalence of smokers decreased by about 3% in the second risk assessment. These data demonstrate that risk assessment can be included as a first step of prevention in primary care. The CUORE Project individual score is expected to become an important tool for GPs to assess their patients' CR, to promote primary prevention, and to focus attention to healthy lifestyle adoption.
2016 Geothermal Technologies Office Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
This report highlights project successes and continued efforts in all of our program areas – EGS, Hydrothermal, Low-Temperature, and Systems Analysis – which are flanked by useful tools and resources and links to more information. Such highlights include FORGE and EGS successes, projects reducing geothermal costs and risks, and advancements in technology research and development.
Commercial Supersonics Technology Project - Status of Airport Noise
NASA Technical Reports Server (NTRS)
Bridges, James
2016-01-01
The Commercial Supersonic Technology Project has been developing databases, computational tools, and system models to prepare for a level 1 milestone, the Low Noise Propulsion Tech Challenge, to be delivered Sept 2016. Steps taken to prepare for the final validation test are given, including system analysis, code validation, and risk reduction testing.
A Case Study of a Community-Based Transition Education Project.
ERIC Educational Resources Information Center
Lake, John; Williamson, John
Evaluation of a 3-year transition education program at the Pingelly School in Western Australia used data from 29 students and staff interviews, direct observation, and document analysis to compare 4 projects established to improve the employability of students (in particular, Aboriginal students and girls who were at highest risk of being early…
A research project was initiated to address a recurring problem of elevated detection limits above required risk-based concentrations for the determination of semivolatile organic compounds in high moisture content solid samples. This project was initiated, in cooperation with t...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Khalil, Y. F.
2012-04-30
The objective of this project is to examine safety aspects of candidate hydrogen storage materials and systems being developed in the DOE Hydrogen Program. As a result of this effort, the general DOE safety target will be given useful meaning by establishing a link between the characteristics of new storage materials and the satisfaction of safety criteria. This will be accomplished through the development and application of formal risk analysis methods, standardized materials testing, chemical reactivity characterization, novel risk mitigation approaches and subscale system demonstration. The project also will collaborate with other DOE and international activities in materials based hydrogenmore » storage safety to provide a larger, highly coordinated effort.« less
MERINOVA: Meteorological risks as drivers of environmental innovation in agro-ecosystem management
NASA Astrophysics Data System (ADS)
Gobin, Anne; Oger, Robert; Marlier, Catherine; Van De Vijver, Hans; Vandermeulen, Valerie; Van Huylenbroeck, Guido; Zamani, Sepideh; Curnel, Yannick; Mettepenningen, Evi
2013-04-01
The BELSPO funded project 'MERINOVA' deals with risks associated with extreme weather phenomena and with risks of biological origin such as pests and diseases. The major objectives of the proposed project are to characterise extreme meteorological events, assess the impact on Belgian agro-ecosystems, characterise their vulnerability and resilience to these events, and explore innovative adaptation options to agricultural risk management. The project comprises of five major parts that reflect the chain of risks: (i) Hazard: Assessing the likely frequency and magnitude of extreme meteorological events by means of probability density functions; (ii) Impact: Analysing the potential bio-physical and socio-economic impact of extreme weather events on agro-ecosystems in Belgium using process-based modelling techniques commensurate with the regional scale; (iii) Vulnerability: Identifying the most vulnerable agro-ecosystems using fuzzy multi-criteria and spatial analysis; (iv) Risk Management: Uncovering innovative risk management and adaptation options using actor-network theory and fuzzy cognitive mapping techniques; and, (v) Communication: Communicating to research, policy and practitioner communities using web-based techniques. The different tasks of the MERINOVA project require expertise in several scientific disciplines: meteorology, statistics, spatial database management, agronomy, bio-physical impact modelling, socio-economic modelling, actor-network theory, fuzzy cognitive mapping techniques. These expertises are shared by the four scientific partners who each lead one work package. The MERINOVA project will concentrate on promoting a robust and flexible framework by demonstrating its performance across Belgian agro-ecosystems, and by ensuring its relevance to policy makers and practitioners. Impacts developed from physically based models will not only provide information on the state of the damage at any given time, but also assist in understanding the links between different factors causing damage and determining bio-physical vulnerability. Socio-economic impacts will enlarge the basis for vulnerability mapping, risk management and adaptation options. A strong expert and end-user network will be established to help disseminating and exploiting project results to meet user needs.
NASA Astrophysics Data System (ADS)
Ray, A. J.; Walker, S. H.; Trainor, S. F.; Cherry, J. E.
2014-12-01
This presentation focuses on linking climate knowledge to the complicated decision process for hydropower dam licensing, and the affected parties involved in that process. The U.S. Federal Energy Regulatory Commission issues of licenses for nonfederal hydroelectric operations, typically 30-50 year licenses, and longer infrastructure lifespan, a similar time frame as the anticipated risks of changing climate and hydrology. Resources managed by other federal and state agencies such as the NOAA National Marine Fisheries Service may be affected by new or re-licensed projects. The federal Integrated Licensing Process gives the opportunity for affected parties to recommend issues for consultative investigation and possible mitigation, such as impacts to downstream fisheries. New or re-licensed projects have the potential to "pre-adapt" by considering and incorporating risks of climate change into their planned operations as license terms and conditions. Hundreds of hydropower facilities will be up for relicensing in the coming years (over 100 in the western Sierra Nevada alone, and large-scale water projects such as the proposed Lake Powell Pipeline), as well as proposed new dams such as the Susitna project in Alaska. Therefore, there is a need for comprehensive guidance on delivering climate analysis to support understanding of risks of hydropower projects to other affected resources, and decisions on licensing. While each project will have a specific context, many of the questions will be similar. We also will discuss best practices for the use of climate science in water project planning and management, and how creating the best and most appropriate science is also still a developing art. We will discuss the potential reliability of that science for consideration in long term planning, licensing, and mitigation planning for those projects. For science to be "actionable," that science must be understood and accepted by the potential users. This process is a negotiation, with climate scientists needing to understand the concerns of users and respond, and users developing a better understanding of the state of climate science in order to make an informed choice. We will also discuss what is needed to streamline providing that analysis for the many re-licensing decisions expected in the upcoming years.
NASA Astrophysics Data System (ADS)
McKinney, D. C.; Cuellar, A. D.
2015-12-01
Climate change has accelerated glacial retreat in high altitude glaciated regions of Nepal leading to the growth and formation of glacier lakes. Glacial lake outburst floods (GLOF) are sudden events triggered by an earthquake, moraine failure or other shock that causes a sudden outflow of water. These floods are catastrophic because of their sudden onset, the difficulty predicting them, and enormous quantity of water and debris rapidly flooding downstream areas. Imja Lake in the Himalaya of Nepal has experienced accelerated growth since it first appeared in the 1960s. Communities threatened by a flood from Imja Lake have advocated for projects to adapt to the increasing threat of a GLOF. Nonetheless, discussions surrounding projects for Imja have not included a rigorous analysis of the potential consequences of a flood, probability of an event, or costs of mitigation projects in part because this information is unknown or uncertain. This work presents a demonstration of a decision making methodology developed to rationally analyze the risks posed by Imja Lake and the various adaptation projects proposed using available information. In this work the authors use decision analysis, data envelopement analysis (DEA), and sensitivity analysis to assess proposed adaptation measures that would mitigate damage in downstream communities from a GLOF. We use an existing hydrodynamic model of the at-risk area to determine how adaptation projects will affect downstream flooding and estimate fatalities using an empirical method developed for dam failures. The DEA methodology allows us to estimate the value of a statistical life implied by each project given the cost of the project and number of lives saved to determine which project is the most efficient. In contrast the decision analysis methodology requires fatalities to be assigned a cost but allows the inclusion of uncertainty in the decision making process. We compare the output of these two methodologies and determine the sensitivity of the conclusions to changes in uncertain input parameters including project cost, value of a statistical life, and time to a GLOF event.
Bayesian Inference for NASA Probabilistic Risk and Reliability Analysis
NASA Technical Reports Server (NTRS)
Dezfuli, Homayoon; Kelly, Dana; Smith, Curtis; Vedros, Kurt; Galyean, William
2009-01-01
This document, Bayesian Inference for NASA Probabilistic Risk and Reliability Analysis, is intended to provide guidelines for the collection and evaluation of risk and reliability-related data. It is aimed at scientists and engineers familiar with risk and reliability methods and provides a hands-on approach to the investigation and application of a variety of risk and reliability data assessment methods, tools, and techniques. This document provides both: A broad perspective on data analysis collection and evaluation issues. A narrow focus on the methods to implement a comprehensive information repository. The topics addressed herein cover the fundamentals of how data and information are to be used in risk and reliability analysis models and their potential role in decision making. Understanding these topics is essential to attaining a risk informed decision making environment that is being sought by NASA requirements and procedures such as 8000.4 (Agency Risk Management Procedural Requirements), NPR 8705.05 (Probabilistic Risk Assessment Procedures for NASA Programs and Projects), and the System Safety requirements of NPR 8715.3 (NASA General Safety Program Requirements).
NASA Technical Reports Server (NTRS)
Shih, Ann T.; Ancel, Ersin; Jones, Sharon Monica; Reveley, Mary S.; Luxhoj, James T.
2012-01-01
Aviation is a problem domain characterized by a high level of system complexity and uncertainty. Safety risk analysis in such a domain is especially challenging given the multitude of operations and diverse stakeholders. The Federal Aviation Administration (FAA) projects that by 2025 air traffic will increase by more than 50 percent with 1.1 billion passengers a year and more than 85,000 flights every 24 hours contributing to further delays and congestion in the sky (Circelli, 2011). This increased system complexity necessitates the application of structured safety risk analysis methods to understand and eliminate where possible, reduce, and/or mitigate risk factors. The use of expert judgments for probabilistic safety analysis in such a complex domain is necessary especially when evaluating the projected impact of future technologies, capabilities, and procedures for which current operational data may be scarce. Management of an R&D product portfolio in such a dynamic domain needs a systematic process to elicit these expert judgments, process modeling results, perform sensitivity analyses, and efficiently communicate the modeling results to decision makers. In this paper a case study focusing on the application of an R&D portfolio of aeronautical products intended to mitigate aircraft Loss of Control (LOC) accidents is presented. In particular, the knowledge elicitation process with three subject matter experts who contributed to the safety risk model is emphasized. The application and refinement of a verbal-numerical scale for conditional probability elicitation in a Bayesian Belief Network (BBN) is discussed. The preliminary findings from this initial step of a three-part elicitation are important to project management practitioners as they illustrate the vital contribution of systematic knowledge elicitation in complex domains.
Cook, Michael B; Guénel, Pascal; Gapstur, Susan M; van den Brandt, Piet A; Michels, Karin B; Casagrande, John T; Cooke, Rosie; Van Den Eeden, Stephen K; Ewertz, Marianne; Falk, Roni T; Gaudet, Mia M; Gkiokas, George; Habel, Laurel A; Hsing, Ann W; Johnson, Kenneth; Kolonel, Laurence N; La Vecchia, Carlo; Lynge, Elsebeth; Lubin, Jay H; McCormack, Valerie A; Negri, Eva; Olsson, Håkan; Parisi, Dominick; Petridou, Eleni Th; Riboli, Elio; Sesso, Howard D; Swerdlow, Anthony; Thomas, David B; Willett, Walter C; Brinton, Louise A
2015-03-01
The etiology of male breast cancer is poorly understood, partly due to its relative rarity. Although tobacco and alcohol exposures are known carcinogens, their association with male breast cancer risk remains ill-defined. The Male Breast Cancer Pooling Project consortium provided 2,378 cases and 51,959 controls for analysis from 10 case-control and 10 cohort studies. Individual participant data were harmonized and pooled. Unconditional logistic regression was used to estimate study design-specific (case-control/cohort) ORs and 95% confidence intervals (CI), which were then combined using fixed-effects meta-analysis. Cigarette smoking status, smoking pack-years, duration, intensity, and age at initiation were not associated with male breast cancer risk. Relations with cigar and pipe smoking, tobacco chewing, and snuff use were also null. Recent alcohol consumption and average grams of alcohol consumed per day were also not associated with risk; only one subanalysis of very high recent alcohol consumption (>60 g/day) was tentatively associated with male breast cancer (ORunexposed referent = 1.29; 95% CI, 0.97-1.71; OR>0-<7 g/day referent = 1.36; 95% CI, 1.04-1.77). Specific alcoholic beverage types were not associated with male breast cancer. Relations were not altered when stratified by age or body mass index. In this analysis of the Male Breast Cancer Pooling Project, we found little evidence that tobacco and alcohol exposures were associated with risk of male breast cancer. Tobacco and alcohol do not appear to be carcinogenic for male breast cancer. Future studies should aim to assess these exposures in relation to subtypes of male breast cancer. ©2014 American Association for Cancer Research.
System Theoretic Frameworks for Mitigating Risk Complexity in the Nuclear Fuel Cycle
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, Adam David; Mohagheghi, Amir H.; Cohn, Brian
In response to the expansion of nuclear fuel cycle (NFC) activities -- and the associated suite of risks -- around the world, this project evaluated systems-based solutions for managing such risk complexity in multimodal and multi-jurisdictional international spent nuclear fuel (SNF) transportation. By better understanding systemic risks in SNF transportation, developing SNF transportation risk assessment frameworks, and evaluating these systems-based risk assessment frameworks, this research illustrated interdependency between safety, security, and safeguards risks is inherent in NFC activities and can go unidentified when each "S" is independently evaluated. Two novel system-theoretic analysis techniques -- dynamic probabilistic risk assessment (DPRA) andmore » system-theoretic process analysis (STPA) -- provide integrated "3S" analysis to address these interdependencies and the research results suggest a need -- and provide a way -- to reprioritize United States engagement efforts to reduce global nuclear risks. Lastly, this research identifies areas where Sandia National Laboratories can spearhead technical advances to reduce global nuclear dangers.« less
Dynamic Cost Risk Assessment for Controlling the Cost of Naval Vessels
2008-04-23
for each individual RRA at the start of the project are depicted in Figures 2a and 2b, respectively. The PDFs are multimodal and cannot be...underestimates cost. 7 Probabilistic cost analysis A physician metaphor Adapted from Yacov Y. Haimes, NPS 2007 8 Dynamic cost risk management A physician... metaphor Adapted from Yacov Y. Haimes, NPS 2007 9 Sources of cost uncertainty Macroscopic analysis Economic, Materials & Labor, Learning rates
NASA Technical Reports Server (NTRS)
Schjelderup, H. C.; Cook, C. Q.; Snyder, E.; Henning, B.; Hosford, J.; Gilles, D. L.; Swanstrom, C. W.
1980-01-01
The potential hazard to electrical and electronic devices should there be a release of free carbon fibers due to an aircraft crash and fire was assessed. Exposure and equipment sensitivity data were compiled for a risk analysis. Results are presented in the following areas: DC-9/DC-10 electrical/electronic component characterization; DC-9 and DC-10 fiber transfer functions; potential for transport aircraft equipment exposure to carbon fibers; and equipment vulnerability assessment. Results reflect only a negligible increase in risk for the DC-9 and DC-10 fleets either now or projected to 1993.
NASA Technical Reports Server (NTRS)
Sabelhaus, Phil
2002-01-01
Risk identification is an ongoing activity that takes place during the routine project work flow. Project activities such as programmatic and technical meetings, telecons, reviews, and other forms of communication often bring to light project risks. When this occurs, we record and analyze the risk on a Risk Information Sheet. This process helps the project team identify and cope with project risks throughout the life of the project.
General risks for tunnelling projects: An overview
NASA Astrophysics Data System (ADS)
Siang, Lee Yong; Ghazali, Farid E. Mohamed; Zainun, Noor Yasmin; Ali, Roslinda
2017-10-01
Tunnels are indispensable when installing new infrastructure as well as when enhancing the quality of existing urban living due to their unique characteristics and potential applications. Over the past few decades, there has been a significant increase in the building of tunnels, world-wide. Tunnelling projects are complex endeavors, and risk assessment for tunnelling projects is likewise a complex process. Risk events are often interrelated. Occurrence of a technical risk usually carries cost and schedule consequences. Schedule risks typically impact cost escalation and project overhead. One must carefully consider the likelihood of a risk's occurrence and its impact in the context of a specific set of project conditions and circumstances. A project's goals, organization, and environment impacts in the context of a specific set of project conditions and circumstances. Some projects are primarily schedule driven; other projects are primarily cost or quality driven. Whether a specific risk event is perceived fundamentally as a cost risk or a schedule risk is governed by the project-specific context. Many researchers have pointed out the significance of recognition and control of the complexity, and risks of tunnelling projects. Although all general information on a project such as estimated duration, estimated cost, and stakeholders can be obtained, it is still quite difficult to accurately understand, predict and control the overall situation and development trends of the project, leading to the risks of tunnelling projects. This paper reviews all the key risks for tunnelling projects from several case studies that have been carried out by other researchers. These risks have been identified and reviewed in this paper. As a result, the current risk management plan in tunnelling projects can be enhanced by including all these reviewed risks as key information.
Leakage Risk Assessment for a Potential CO2 Storage Project in Saskatchewan, Canada
DOE Office of Scientific and Technical Information (OSTI.GOV)
Houseworth, J.E.; Oldenburg, C.M.; Mazzoldi, A.
2011-05-01
A CO{sub 2} sequestration project is being considered to (1) capture CO{sub 2} emissions from the Consumers Cooperative Refineries Limited at Regina, Saskatchewan and (2) geologically sequester the captured CO{sub 2} locally in a deep saline aquifer. This project is a collaboration of several industrial and governmental organizations, including the Petroleum Technology Research Centre (PTRC), Sustainable Development Technology Canada (SDTC), SaskEnvironment Go Green Fund, SaskPower, CCRL, Schlumberger Carbon Services, and Enbridge. The project objective is to sequester 600 tonnes CO{sub 2}/day. Injection is planned to start in 2012 or 2013 for a period of 25 years for a total storagemore » of approximately 5.5 million tonnes CO{sub 2}. This report presents an assessment of the leakage risk of the proposed project using a methodology known as the Certification Framework (CF). The CF is used for evaluating CO{sub 2} leakage risk associated with geologic carbon sequestration (GCS), as well as brine leakage risk owing to displacement and pressurization of brine by the injected CO{sub 2}. We follow the CF methodology by defining the entities (so-called Compartments) that could be impacted by CO{sub 2} leakage, the CO{sub 2} storage region, the potential for leakage along well and fault pathways, and the consequences of such leakage. An understanding of the likelihood and consequences of leakage forms the basis for understanding CO{sub 2} leakage risk, and forms the basis for recommendations of additional data collection and analysis to increase confidence in the risk assessment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bufoni, André Luiz, E-mail: bufoni@facc.ufrj.br; Oliveira, Luciano Basto; Rosa, Luiz Pinguelli
Highlights: • Projects are not financially attractive without registration as CDMs. • WM benchmarks and indicators are converging and reducing in variance. • A sensitivity analysis reveal that revenue has more of an effect on the financial results. • Results indicate that an extensive database would reduce WM project risk and capital costs. • Disclosure standards would make information more comparable worldwide. - Abstract: This study illustrates the financial analyses for demonstration and assessment of additionality presented in the project design (PDD) and enclosed documents of the 431 large Clean Development Mechanisms (CDM) classified as the ‘waste handling and disposalmore » sector’ (13) over the past ten years (2004–2014). The expected certified emissions reductions (CER) of these projects total 63.54 million metric tons of CO{sub 2}eq, where eight countries account for 311 projects and 43.36 million metric tons. All of the projects declare themselves ‘not financially attractive’ without CER with an estimated sum of negative results of approximately a half billion US$. The results indicate that WM benchmarks and indicators are converging and reducing in variance, and the sensitivity analysis reveals that revenues have a greater effect on the financial results. This work concludes that an extensive financial database with simple standards for disclosure would greatly diminish statement problems and make information more comparable, reducing the risk and capital costs of WM projects.« less
Lorenz, Matthias W.; Bickel, Horst; Bots, Michiel L.; Breteler, Monique M.B.; Catapano, Alberico L.; Desvarieux, Moise; Hedblad, Bo; Iglseder, Bernhard; Johnsen, Stein Harald; Juraska, Michal; Kiechl, Stefan; Mathiesen, Ellisiv B.; Norata, Giuseppe D.; Grigore, Liliana; Polak, Joseph; Poppert, Holger; Rosvall, Maria; Rundek, Tatjana; Sacco, Ralph L.; Sander, Dirk; Sitzer, Matthias; Steinmetz, Helmuth; Stensland, Eva; Willeit, Johann; Witteman, Jacqueline; Yanez, David; Thompson, Simon G.
2013-01-01
Carotid intima media thickness (IMT) progression is increasingly used as a surrogate for vascular risk. This use is supported by data from a few clinical trials investigating statins, but established criteria of surrogacy are only partially fulfilled. To provide a valid basis for the use of IMT progression as a study end point, we are performing a 3-step meta-analysis project based on individual participant data. Objectives of the 3 successive stages are to investigate (1) whether IMT progression prospectively predicts myocardial infarction, stroke, or death in population-based samples; (2) whether it does so in prevalent disease cohorts; and (3) whether interventions affecting IMT progression predict a therapeutic effect on clinical end points. Recruitment strategies, inclusion criteria, and estimates of the expected numbers of eligible studies are presented along with a detailed analysis plan. PMID:20435179
Program and Project Management Framework
NASA Technical Reports Server (NTRS)
Butler, Cassandra D.
2002-01-01
The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.
Multidimensional Risk Analysis: MRISK
NASA Technical Reports Server (NTRS)
McCollum, Raymond; Brown, Douglas; O'Shea, Sarah Beth; Reith, William; Rabulan, Jennifer; Melrose, Graeme
2015-01-01
Multidimensional Risk (MRISK) calculates the combined multidimensional score using Mahalanobis distance. MRISK accounts for covariance between consequence dimensions, which de-conflicts the interdependencies of consequence dimensions, providing a clearer depiction of risks. Additionally, in the event the dimensions are not correlated, Mahalanobis distance reduces to Euclidean distance normalized by the variance and, therefore, represents the most flexible and optimal method to combine dimensions. MRISK is currently being used in NASA's Environmentally Responsible Aviation (ERA) project o assess risk and prioritize scarce resources.
M.H.C.G. Steeghs
2008-01-01
As part of the EU project ?Risk analysis for Phytophthora ramorum, a recently recognised pathogen threat to Europe and the cause of Sudden Oak Death in the USA? (acronym RAPRA) outbreak scenarios are defined and existing strategies for eradication and containment of Phytophthora ramorum evaluated. Based on the current knowledge...
DOT National Transportation Integrated Search
2014-02-01
The purpose of this memorandum is to provide recommended Total System Error (TSE) models : for aircraft using RNAV (GPS) guidance when analyzing the wake encounter risk of proposed : simultaneous dependent (paired) approach operations to Closel...
DOE Office of Scientific and Technical Information (OSTI.GOV)
McJunkin, Timothy; Epiney, Aaron; Rabiti, Cristian
2017-06-01
This report provides a summary of the effort in the Nuclear-Renewable Hybrid Energy System (N-R HES) project on the level 4 milestone to consider integration of existing grid models into the factors for optimization on shorter time intervals than the existing electric grid models with the Risk Analysis Virtual Environment (RAVEN) and Modelica [1] optimizations and economic analysis that are the focus of the project to date.
Rosati, Nicoletta
2002-04-01
Project selection and portfolio management are particularly challenging in the pharmaceutical industry due to the high risk - high stake nature of the drug development process. In the recent years, scholars and industry experts have agreed that traditional Net-Present-Value evaluation of the projects fails to capture the value of managerial flexibility, and encouraged adopting a real options approach to recover the missed value. In this paper, we take a closer look at the drug development process and at the indices currently used to rank projects. We discuss the economic value of information and of real options arising in drug development and present decision analysis as an ideal framework for the implementation of real options valuation.
Probabilistic Risk Assessment (PRA): A Practical and Cost Effective Approach
NASA Technical Reports Server (NTRS)
Lee, Lydia L.; Ingegneri, Antonino J.; Djam, Melody
2006-01-01
The Lunar Reconnaissance Orbiter (LRO) is the first mission of the Robotic Lunar Exploration Program (RLEP), a space exploration venture to the Moon, Mars and beyond. The LRO mission includes spacecraft developed by NASA Goddard Space Flight Center (GSFC) and seven instruments built by GSFC, Russia, and contractors across the nation. LRO is defined as a measurement mission, not a science mission. It emphasizes the overall objectives of obtaining data to facilitate returning mankind safely to the Moon in preparation for an eventual manned mission to Mars. As the first mission in response to the President's commitment of the journey of exploring the solar system and beyond: returning to the Moon in the next decade, then venturing further into the solar system, ultimately sending humans to Mars and beyond, LRO has high-visibility to the public but limited resources and a tight schedule. This paper demonstrates how NASA's Lunar Reconnaissance Orbiter Mission project office incorporated reliability analyses in assessing risks and performing design tradeoffs to ensure mission success. Risk assessment is performed using NASA Procedural Requirements (NPR) 8705.5 - Probabilistic Risk Assessment (PRA) Procedures for NASA Programs and Projects to formulate probabilistic risk assessment (PRA). As required, a limited scope PRA is being performed for the LRO project. The PRA is used to optimize the mission design within mandated budget, manpower, and schedule constraints. The technique that LRO project office uses to perform PRA relies on the application of a component failure database to quantify the potential mission success risks. To ensure mission success in an efficient manner, low cost and tight schedule, the traditional reliability analyses, such as reliability predictions, Failure Modes and Effects Analysis (FMEA), and Fault Tree Analysis (FTA), are used to perform PRA for the large system of LRO with more than 14,000 piece parts and over 120 purchased or contractor built components.
Projections of Flood Risk using Credible Climate Signals in the Ohio River Basin
NASA Astrophysics Data System (ADS)
Schlef, K.; Robertson, A. W.; Brown, C.
2017-12-01
Estimating future hydrologic flood risk under non-stationary climate is a key challenge to the design of long-term water resources infrastructure and flood management strategies. In this work, we demonstrate how projections of large-scale climate patterns can be credibly used to create projections of long-term flood risk. Our study area is the northwest region of the Ohio River Basin in the United States Midwest. In the region, three major teleconnections have been previously demonstrated to affect synoptic patterns that influence extreme precipitation and streamflow: the El Nino Southern Oscillation, the Pacific North American pattern, and the Pacific Decadal Oscillation. These teleconnections are strongest during the winter season (January-March), which also experiences the greatest number of peak flow events. For this reason, flood events are defined as the maximum daily streamflow to occur in the winter season. For each gage in the region, the location parameter of a log Pearson type 3 distribution is conditioned on the first principal component of the three teleconnections to create a statistical model of flood events. Future projections of flood risk are created by forcing the statistical model with projections of the teleconnections from general circulation models selected for skill. We compare the results of our method to the results of two other methods: the traditional model chain (i.e., general circulation model projections to downscaling method to hydrologic model to flood frequency analysis) and that of using the historic trend. We also discuss the potential for developing credible projections of flood events for the continental United States.
Human Factors Analysis of Pipeline Monitoring and Control Operations: Final Technical Report
DOT National Transportation Integrated Search
2008-11-26
The purpose of the Human Factors Analysis of Pipeline Monitoring and Control Operations project was to develop procedures that could be used by liquid pipeline operators to assess and manage the human factors risks in their control rooms that may adv...
Dynamic Positioning System (DPS) Risk Analysis Using Probabilistic Risk Assessment (PRA)
NASA Technical Reports Server (NTRS)
Thigpen, Eric B.; Boyer, Roger L.; Stewart, Michael A.; Fougere, Pete
2017-01-01
The National Aeronautics and Space Administration (NASA) Safety & Mission Assurance (S&MA) directorate at the Johnson Space Center (JSC) has applied its knowledge and experience with Probabilistic Risk Assessment (PRA) to projects in industries ranging from spacecraft to nuclear power plants. PRA is a comprehensive and structured process for analyzing risk in complex engineered systems and/or processes. The PRA process enables the user to identify potential risk contributors such as, hardware and software failure, human error, and external events. Recent developments in the oil and gas industry have presented opportunities for NASA to lend their PRA expertise to both ongoing and developmental projects within the industry. This paper provides an overview of the PRA process and demonstrates how this process was applied in estimating the probability that a Mobile Offshore Drilling Unit (MODU) operating in the Gulf of Mexico and equipped with a generically configured Dynamic Positioning System (DPS) loses location and needs to initiate an emergency disconnect. The PRA described in this paper is intended to be generic such that the vessel meets the general requirements of an International Maritime Organization (IMO) Maritime Safety Committee (MSC)/Circ. 645 Class 3 dynamically positioned vessel. The results of this analysis are not intended to be applied to any specific drilling vessel, although provisions were made to allow the analysis to be configured to a specific vessel if required.
Greene, Sharon K.; Kulldorff, Martin; Lewis, Edwin M.; Li, Rong; Yin, Ruihua; Weintraub, Eric S.; Fireman, Bruce H.; Lieu, Tracy A.; Nordin, James D.; Glanz, Jason M.; Baxter, Roger; Jacobsen, Steven J.; Broder, Karen R.; Lee, Grace M.
2010-01-01
The emergence of pandemic H1N1 influenza in 2009 has prompted public health responses, including production and licensure of new influenza A (H1N1) 2009 monovalent vaccines. Safety monitoring is a critical component of vaccination programs. As proof-of-concept, the authors mimicked near real-time prospective surveillance for prespecified neurologic and allergic adverse events among enrollees in 8 medical care organizations (the Vaccine Safety Datalink Project) who received seasonal trivalent inactivated influenza vaccine during the 2005/06–2007/08 influenza seasons. In self-controlled case series analysis, the risk of adverse events in a prespecified exposure period following vaccination was compared with the risk in 1 control period for the same individual either before or after vaccination. In difference-in-difference analysis, the relative risk in exposed versus control periods each season was compared with the relative risk in previous seasons since 2000/01. The authors used Poisson-based analysis to compare the risk of Guillian-Barré syndrome following vaccination in each season with that in previous seasons. Maximized sequential probability ratio tests were used to adjust for repeated analyses on weekly data. With administration of 1,195,552 doses to children under age 18 years and 4,773,956 doses to adults, no elevated risk of adverse events was identified. Near real-time surveillance for selected adverse events can be implemented prospectively to rapidly assess seasonal and pandemic influenza vaccine safety. PMID:19965887
NASA Astrophysics Data System (ADS)
Kar, B.; Robinson, C.; Koch, D. B.; Omitaomu, O.
2017-12-01
The Sendai Framework for Disaster Risk Reduction 2015-2030 identified the following four priorities to prevent and reduce disaster risks: i) understanding disaster risk; ii) strengthening governance to manage disaster risk; iii) investing in disaster risk reduction for resilience and; iv) enhancing disaster preparedness for effective response, and to "Build Back Better" in recovery, rehabilitation and reconstruction. While forecasting and decision making tools are in place to predict and understand future impacts of natural hazards, the knowledge to action approach that currently exists fails to provide updated information needed by decision makers to undertake response and recovery efforts following a hazard event. For instance, during a tropical storm event advisories are released every two to three hours, but manual analysis of geospatial data to determine potential impacts of the event tends to be time-consuming and a post-event process. Researchers at Oak Ridge National Laboratory have developed a Spatial Decision Support System that enables real-time analysis of storm impact based on updated advisory. A prototype of the tool that focuses on determining projected power outage areas and projected duration of outages demonstrates the feasibility of integrating science with decision making for emergency management personnel to act in real time to protect communities and reduce risk.
EconoMe-Develop - a calculation tool for multi-risk assessment and benefit-cost-analysis
NASA Astrophysics Data System (ADS)
Bründl, M.
2012-04-01
Public money is used to finance the protection of human life, material assets and the environment against natural hazards. This limited resource should be used in a way that it achieves the maximum possible effect by minimizing as many risks as possible. Hence, decision-makers are facing the question which mitigation measures should be prioritised. Benefit-Cost-Analysis (BCA) is a recognized method for determining the economic efficiency of investments in mitigation measures. In Switzerland, the Federal Office for the Environment (FOEN) judges the benefit-cost-ratio of mitigation projects on the base of the results of the calculation tool "EconoMe" [1]. The check of the economic efficiency of mitigation projects with an investment of more than 1 million CHF (800,000 EUR) by using "EconoMe" is mandatory since 2008 in Switzerland. Within "EconoMe", most calculation parameters cannot be changed by the user allowing for comparable results. Based on the risk guideline "RIKO" [2] an extended version of the operational version of "EconoMe", called "EconoMe-Develop" was developed. "EconoMe-Develop" is able to deal with various natural hazard processes and thus allows multi-risk assessments, since all restrictions of the operational version of "EconoMe" like e.g. the number of scenarios and expositions, vulnerability, spatial probability of processes and probability of presence of objects, are not existing. Additionally, the influences of uncertainty of calculation factors, like e.g. vulnerability, on the final results can be determined. "EconoMe-Develop" offers import and export of data, e.g. results of GIS-analysis. The possibility for adapting the tool to user specific requirements makes EconoMe-Develop an easy-to-use tool for risk assessment and assessment of economic efficiency of mitigation projects for risk experts. In the paper we will present the most important features of the tool and we will illustrate the application by a practical example.
Lu, Jiapeng; Xuan, Si; Downing, Nicholas S; Wu, Chaoqun; Li, Li; Krumholz, Harlan M; Jiang, Lixin
2016-01-01
Introduction Collection of high-quality data from large populations is considered essential to generate knowledge that is critical to an era of precision medicine. Cardiovascular disease (CVD) is a leading cause of mortality in China and is a suitable focus of an initiative to discover factors that would improve our ability to assess and modify individual risk. Methods and analysis The pilot phase of China PEACE (Patient-centered Evaluative Assessment of Cardiac Events) Million Persons Project is being conducted during 2014–2015 in four provinces across China to demonstrate the feasibility of a population-based assessment. It is designed to screen 0.4 million community-dwelling residents aged 40–75 years with measurements of blood pressure, height and weight, a lipid blood test, and a questionnaire on cardiovascular-related health status. Participants identified at high risk of CVD receive further health assessments, including ECG, ultrasound scan, blood and urine analysis, and a questionnaire on lifestyle and medical history. Collection of blood and urine samples is used to establish a biobank. High-risk subjects are also counselled with suggestions regarding potential lifestyle changes. In addition, high-risk subjects are followed-up either in a return clinic visit or by telephone interview, with measurement of blood pressure, weight, ECG, and a questionnaire on survival status, hospitalisations and lifestyle. The first 0.1 million participants screened were used to conduct a preliminary analysis, with information on baseline characteristics, health-related behaviours, anthropometric variables, medical history, and prevalence of high-risk subjects. Ethics and dissemination The central ethics committee at the China National Center for Cardiovascular Disease (NCCD) approved the pilot. Written informed consent is obtained from all participants on entry into the project. Findings will be disseminated in future peer-reviewed papers and will inform strategies aimed at developing precise methods of assessing and modifying risk. Trial registration number NCT02536456. PMID:26729395
Exploration Laboratory Analysis - ARC
NASA Technical Reports Server (NTRS)
Krihak, Michael K.; Fung, Paul P.
2012-01-01
The Exploration Laboratory Analysis (ELA) project supports the Exploration Medical Capability (ExMC) risk, Risk of Inability to Adequately Treat an Ill or Injured Crew Member, and ExMC Gap 4.05: Lack of minimally invasive in-flight laboratory capabilities with limited consumables required for diagnosing identified Exploration Medical Conditions. To mitigate this risk, the availability of inflight laboratory analysis instrumentation has been identified as an essential capability in future exploration missions. Mission architecture poses constraints on equipment and procedures that will be available to treat evidence-based medical conditions according to the Space Medicine Exploration Medical Conditions List (SMEMCL). The SMEMCL provided diagnosis and treatment for the evidence-based medical conditions and hence, a basis for developing ELA functional requirements.
Application of the NUREG/CR-6850 EPRI/NRC Fire PRA Methodology to a DOE Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tom Elicson; Bentley Harwood; Richard Yorg
2011-03-01
The application NUREG/CR-6850 EPRI/NRC fire PRA methodology to DOE facility presented several challenges. This paper documents the process and discusses several insights gained during development of the fire PRA. A brief review of the tasks performed is provided with particular focus on the following: • Tasks 5 and 14: Fire-induced risk model and fire risk quantification. A key lesson learned was to begin model development and quantification as early as possible in the project using screening values and simplified modeling if necessary. • Tasks 3 and 9: Fire PRA cable selection and detailed circuit failure analysis. In retrospect, it wouldmore » have been beneficial to perform the model development and quantification in 2 phases with detailed circuit analysis applied during phase 2. This would have allowed for development of a robust model and quantification earlier in the project and would have provided insights into where to focus the detailed circuit analysis efforts. • Tasks 8 and 11: Scoping fire modeling and detailed fire modeling. More focus should be placed on detailed fire modeling and less focus on scoping fire modeling. This was the approach taken for the fire PRA. • Task 14: Fire risk quantification. Typically, multiple safe shutdown (SSD) components fail during a given fire scenario. Therefore dependent failure analysis is critical to obtaining a meaningful fire risk quantification. Dependent failure analysis for the fire PRA presented several challenges which will be discussed in the full paper.« less
Magnetic Fields on the National Ignition Facility (MagNIF)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mason, D.; Folta, J.
2016-08-12
A magnetized target capability on the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) has been investigated. Stakeholders’ needs and project feasibility analysis were considered in order to down-select from a wide variety of different potential magnetic field magnitudes and volumes. From the large range of different target platforms, laser configurations, and diagnostics configurations of interest to the stakeholders, the gas-pipe platform has been selected for the first round of magnetized target experiments. Gas pipe targets are routinely shot on the NIF and provide unique value for external collaborators. High-level project goals have been established including an experimentallymore » relevant 20Tesla magnetic field magnitude. The field will be achieved using pulsed power-driven coils. A system architecture has been proposed. The pulsed power drive system will be located in the NIF target bay. This decision provides improved maintainability and mitigates equipment safety risks associated with explosive failure of the drive capacitor. High-level and first-level subsystem requirements have been established. Requirements have been included for two distinct coil designs – full solenoid and quasi-Helmholtz. A Failure Modes and Effects Analysis (FMEA) has been performed and documented. Additional requirements have been derived from the mitigations included in the FMEA document. A project plan is proposed. The plan includes a first phase of electromagnetic simulations to assess whether the design will meet performance requirements, then a second phase of risk mitigation projects to address the areas of highest technical risk. The duration from project kickoff to the first magnetized target shot is approximately 29 months.« less
Project delay analysis of HRSG
NASA Astrophysics Data System (ADS)
Silvianita; Novega, A. S.; Rosyid, D. M.; Suntoyo
2017-08-01
Completion of HRSG (Heat Recovery Steam Generator) fabrication project sometimes is not sufficient with the targeted time written on the contract. The delay on fabrication process can cause some disadvantages for fabricator, including forfeit payment, delay on HRSG construction process up until HRSG trials delay. In this paper, the author is using semi quantitative on HRSG pressure part fabrication delay with configuration plant 1 GT (Gas Turbine) + 1 HRSG + 1 STG (Steam Turbine Generator) using bow-tie analysis method. Bow-tie analysis method is a combination from FTA (Fault tree analysis) and ETA (Event tree analysis) to develop the risk matrix of HRSG. The result from FTA analysis is use as a threat for preventive measure. The result from ETA analysis is use as impact from fabrication delay.
The use of multi-dimensional flow and morphodynamic models for restoration design analysis
NASA Astrophysics Data System (ADS)
McDonald, R.; Nelson, J. M.
2013-12-01
River restoration projects with the goal of restoring a wide range of morphologic and ecologic channel processes and functions have become common. The complex interactions between flow and sediment-transport make it challenging to design river channels that are both self-sustaining and improve ecosystem function. The relative immaturity of the field of river restoration and shortcomings in existing methodologies for evaluating channel designs contribute to this problem, often leading to project failures. The call for increased monitoring of constructed channels to evaluate which restoration techniques do and do not work is ubiquitous and may lead to improved channel restoration projects. However, an alternative approach is to detect project flaws before the channels are built by using numerical models to simulate hydraulic and sediment-transport processes and habitat in the proposed channel (Restoration Design Analysis). Multi-dimensional models provide spatially distributed quantities throughout the project domain that may be used to quantitatively evaluate restoration designs for such important metrics as (1) the change in water-surface elevation which can affect the extent and duration of floodplain reconnection, (2) sediment-transport and morphologic change which can affect the channel stability and long-term maintenance of the design; and (3) habitat changes. These models also provide an efficient way to evaluate such quantities over a range of appropriate discharges including low-probability events which often prove the greatest risk to the long-term stability of restored channels. Currently there are many free and open-source modeling frameworks available for such analysis including iRIC, Delft3D, and TELEMAC. In this presentation we give examples of Restoration Design Analysis for each of the metrics above from projects on the Russian River, CA and the Kootenai River, ID. These examples demonstrate how detailed Restoration Design Analysis can be used to guide design elements and how this method can point out potential stability problems or other risks before designs proceed to the construction phase.
Land, Charles E; Bouville, André; Apostoaei, Iulian; Simon, Steven L
2010-08-01
Radioactive fallout from nuclear test detonations during 1946-1958 at Bikini and Enewetak Atolls in the Marshall Islands (MI) exposed populations living elsewhere in the MI archipelago. A comprehensive analysis, presented in seven companion papers, has produced estimates of tissue-specific radiation absorbed dose to MI residents at all historically inhabited atolls from internal (ingested) and external irradiation resulting from exposure to radioactive fallout, by calendar year, and by age of the population at time of exposure. The present report deals, for the first time, with the implications of these doses for cancer risk among exposed members of the MI population. Radiation doses differed by geographic location and year of birth, and radiation-related cancer risk depends upon age at exposure and age at observation for risk. Using dose-response models based on committee reports published by the National Research Council and the National Institutes of Health, we project that, during the lifetimes of members of the MI population potentially exposed to ionizing radiation from weapons test fallout deposited during the testing period (1948-1958) and from residual radioactive sources during the subsequent 12 y (1959-1970), perhaps 1.6% (with 90% uncertainty range 0.4% to 3.4%) of all cancers might be attributable to fallout-related radiation exposures. By sub-population, the projected proportion of cancers attributable to radiation from fallout from all nuclear tests conducted in the Marshall Islands is 55% (28% to 69%) among 82 persons exposed in 1954 on Rongelap and Ailinginae, 10% (2.4% to 22%) for 157 persons exposed on Utrik, and 2.2% (0.5% to 4.8%) and 0.8% (0.2% to 1.8%), respectively, for the much larger populations exposed in mid-latitude locations including Kwajalein and in southern locations including Majuro. By cancer type, point estimates of attributable risk varied, by location, between 12% and 95% for thyroid cancer, between 2% and 78% for leukemia, and between 0.8% and 55% for all cancers combined. The largest projected risks pertain to the Rongelap Island community and the lowest risks pertain to the populations resident on the southern-most atolls. While the projected cancer risks are smaller than those estimated by the National Cancer Institute in a more simplistic analysis conducted in 2004, these estimates of cancer risk are the best available as they are based on the most detailed dose reconstruction to date and comprehensively include populations at all locations and dose contributions from all nuclear tests.
DOT National Transportation Integrated Search
2010-02-01
State highway authorities routinely examine the quality of the materials used to build highway construction projects. Some : materials are tested, some are accepted through a manufacturers certification of quality or compliance, some are physicall...
Kuiper, H A; König, A; Kleter, G A; Hammes, W P; Knudsen, I
2004-07-01
The most important results from the EU-sponsored ENTRANSFOOD Thematic Network project are reviewed, including the design of a detailed step-wise procedure for the risk assessment of foods derived from genetically modified crops based on the latest scientific developments, evaluation of topical risk assessment issues, and the formulation of proposals for improved risk management and public involvement in the risk analysis process. Copyright 2004 Elsevier Ltd.
Risk management in obstetric care for family physicians: results of a 10-year project.
Nesbitt, Thomas S; Hixon, Allen; Tanji, Jeffrey L; Scherger, Joseph E; Abbott, Dana
2003-01-01
Malpractice issues within the United States remain a critical factor for family physicians providing obstetric care. Although tort reform is being widely discussed, little has been written regarding the malpractice crisis from a risk management perspective. Between 1989 and 1998, a 10-year risk management study at the UC Davis Health System provided a unique collaboration between researchers, a mutual insurance carrier and family physicians practicing obstetrics. Physicians were asked to comply with standardized clinical guidelines, attend continuing medical education (CME) seminars, and submit obstetric medical records for review. Feedback analysis was provided to each physician on their records, and the insurance carrier tracked interim malpractice claims. One hundred and ninety-four physicians participated, attending to 32,831 births. Compliance with project guidelines was 91%. Five closed obstetric cases were reported with only one settlement reported to the National Provider Data Bank. Physicians believed the project was beneficial to their practices. Family physicians practicing obstetrics are willing to participate in a collaborative risk management program and are compliant with standardized clinical guidelines. The monetary award for successful malpractice claims was relatively low. This collaborative risk management model may offer a potential solution to the current malpractice crisis.
Risk Management Technique for design and operation of facilities and equipment
NASA Technical Reports Server (NTRS)
Fedor, O. H.; Parsons, W. N.; Coutinho, J. De S.
1975-01-01
The Risk Management System collects information from engineering, operating, and management personnel to identify potentially hazardous conditions. This information is used in risk analysis, problem resolution, and contingency planning. The resulting hazard accountability system enables management to monitor all identified hazards. Data from this system are examined in project reviews so that management can decide to eliminate or accept these risks. This technique is particularly effective in improving the management of risks in large, complex, high-energy facilities. These improvements are needed for increased cooperation among industry, regulatory agencies, and the public.
Mirabel: an integrated project for risk and cost/benefit analysis of peanut allergy.
Crépet, A; Papadopoulos, A; Elegbede, C F; Ait-Dahmane, S; Loynet, C; Millet, G; Van Der Brempt, X; Bruyère, O; Marette, S; Moneret-Vautrin, D A
2015-03-01
Food allergy is a major public health issue. However, no regulatory measures exist when allergens are present at trace levels and the different risk components are poorly described. Thus, knowledge on exposure components such as the allergens present in foods and the consumption behaviour of allergic consumers and models to estimate the related risk need to be enriched. Mirabel proposes for the first time studying each risk component using an integrated approach in order to improve the quality of life of the allergic population. Field surveys were conducted in order to fill in the current gaps in unintentional allergen traces in food, allergic consumers' food behaviour, threshold doses of allergic reaction, allergy symptoms and severity. The aim is also to propose methodological and operational tools to quantify allergic risk, to test management scenarios and to produce a cost/benefit analysis. Medical data on the peanut allergies of 785 patients were collected in the MIRABEL survey and 443 patients answered the food consumption questionnaire. The population surveyed was mostly paediatric - 86% were children under 16 years of age, with a high percentage of males (60%). This project will generate tangible results on peanut allergen exposure and risk which could be used in future risk assessment work and particularly to provide science-based guidance to set up concentration limits for peanut traces on packages. Copyright © 2014 Elsevier Inc. All rights reserved.
Multi-hazard risk assessment applied to hydraulic fracturing operations
NASA Astrophysics Data System (ADS)
Garcia-Aristizabal, Alexander; Gasparini, Paolo; Russo, Raffaella; Capuano, Paolo
2017-04-01
Without exception, the exploitation of any energy resource produces impacts and intrinsically bears risks. Therefore, to make sound decisions about future energy resource exploitation, it is important to clearly understand the potential environmental impacts in the full life-cycle of an energy development project, distinguishing between the specific impacts intrinsically related to exploiting a given energy resource and those shared with the exploitation of other energy resources. Technological advances as directional drilling and hydraulic fracturing have led to a rapid expansion of unconventional resources (UR) exploration and exploitation; as a consequence, both public health and environmental concerns have risen. The main objective of a multi-hazard risk assessment applied to the development of UR is to assess the rate (or the likelihood) of occurrence of incidents and the relative potential impacts on surrounding environment, considering different hazards and their interactions. Such analyses have to be performed considering the different stages of development of a project; however, the discussion in this paper is mainly focused on the analysis applied to the hydraulic fracturing stage of a UR development project. The multi-hazard risk assessment applied to the development of UR poses a number of challenges, making of this one a particularly complex problem. First, a number of external hazards might be considered as potential triggering mechanisms. Such hazards can be either of natural origin or anthropogenic events caused by the same industrial activities. Second, failures might propagate through the industrial elements, leading to complex scenarios according to the layout of the industrial site. Third, there is a number of potential risk receptors, ranging from environmental elements (as the air, soil, surface water, or groundwater) to local communities and ecosystems. The multi-hazard risk approach for this problem is set by considering multiple hazards (and their possible interactions) as possible sources of system's perturbation that might drive to the development of an incidental event. Given the complexity of the problem, we adopt a multi-level approach: first, perform a qualitative analysis oriented to the identification of a wide range of possible scenarios; this process is based on a review of potential impacts in different risk receptors reported in literature, which is condensed in a number of causal diagrams created for different stages of a UR development project. Second, the most important scenarios for quantitative multi-hazard risk analyses are selected for further quantification. This selection is based on the identification of major risks, i.e., those related with the occurrence of low probability/high impact extreme events. The general framework for the quantitative multi-hazard risk analysis is represented using a so-called bow-tie structure. It is composed of a fault tree on the left hand side of the graphic plot, identifying the possible events causing the critical (or top) event, and an event tree on the right-hand side showing the possible consequences of the critical event. This work was supported under SHEER: "Shale Gas Exploration and Exploitation Induced Risks" project n.640896, funded from Horizon 2020 - R&I Framework Programme, call H2020-LCE-2014-1
49 CFR 260.17 - Credit risk premium analysis.
Code of Federal Regulations, 2012 CFR
2012-10-01
... past and projected: (A) Profitability; (B) Liquidity; (C) Financial strength; (D) Size; and (E) Level... improving revenues, profitability and cash flow from operations; and (B) Reliance on third parties for...
49 CFR 260.17 - Credit risk premium analysis.
Code of Federal Regulations, 2014 CFR
2014-10-01
... past and projected: (A) Profitability; (B) Liquidity; (C) Financial strength; (D) Size; and (E) Level... improving revenues, profitability and cash flow from operations; and (B) Reliance on third parties for...
49 CFR 260.17 - Credit risk premium analysis.
Code of Federal Regulations, 2011 CFR
2011-10-01
... past and projected: (A) Profitability; (B) Liquidity; (C) Financial strength; (D) Size; and (E) Level... improving revenues, profitability and cash flow from operations; and (B) Reliance on third parties for...
49 CFR 260.17 - Credit risk premium analysis.
Code of Federal Regulations, 2013 CFR
2013-10-01
... past and projected: (A) Profitability; (B) Liquidity; (C) Financial strength; (D) Size; and (E) Level... improving revenues, profitability and cash flow from operations; and (B) Reliance on third parties for...
Kevin M. Potter; Barbara S. Crane; William W. Hargrove
2015-01-01
A variety of threats, most importantly climate change and insect and disease infestation, will increase the likelihood that forest tree species could experience population-level extirpation or species-level extinction during the next century. Project CAPTURE (Conservation Assessment and Prioritization of Forest Trees Under Risk of Extirpation) is a cooperative effort...
NASA Technical Reports Server (NTRS)
Jr., R. F. Miles
1995-01-01
Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.
The Climate Change Impacts and Risk Analysis (CIRA) project establishes a new multi-model framework to systematically assess the impacts, economic damages, and risks from climate change in the United States. The primary goal of this framework to estimate how climate change impac...
Integrated Risk Management Within NASA Programs/Projects
NASA Technical Reports Server (NTRS)
Connley, Warren; Rad, Adrian; Botzum, Stephen
2004-01-01
As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the chances for mission success.
Changing pattern of landslide risk in Europe - The SafeLand project
NASA Astrophysics Data System (ADS)
Nadim, F.; Kalsnes, B. G.; SafeLand Research Consortium
2011-12-01
The changing pattern of landslide hazard and risk caused by climate change and changes in demography, the need to protect people and property, the reality for society in Europe to live with hazard and risk and the need to manage risk were the motives for the project SafeLand: "Living with landslide risk in Europe: Assessment, effects of global change, and risk management strategies." SafeLand is a large, integrating research project under the European Commission's 7th Framework Programme (FP7). It started on 1 May 2009 and will go on for 3 years, ending on 30 April 2012. There project involves 27 partners from 12 European countries, and has international collaborators and advisers from China, India, USA, Japan and Hong Kong. SafeLand also involves 25 End-Users from 11 countries. SafeLand is coordinated by the International Centre for Geohazards (ICG) at Norwegian Geotechnical Institute in Norway. Further information on the SafeLand project can be found at its web site http://www.safeland-fp7.eu/ . SafeLand is an ongoing project, which results will be finalized in 2012. This lecture summarizes the SafeLand's activities and achievements until November 2011. The main results achieved so far include: - Development and testing of several empirical methods for predicting the characteristics of threshold rainfall events for triggering of precipitation-induced landslides. - Identification of landslide hazard and risk hotspots by an objective, GIS-based analysis for Europe. The results show clearly where landslides pose the largest hazard in Europe and the objective approach allows a ranking of the countries by exposed area and population. - Different regional climate model simulations over Europe (from the EU FP6 project ENSEMBLES) at a spatial resolution of 25 x 25 km have been used to perform an extreme value analysis for trends in heavy precipitation events. In winter a general trend towards more heavy precipitation events across all analyzed regional climate model simulations is found. For summer, a slight increase of heavy precipitation in Northern Europe and a general decrease in southern Europe is found in all regional climate model simulations. - The prototype of a web-based "toolbox" of innovative and technically appropriate prevention and mitigation measures was developed. The toolbox does a preliminary assessment and ranking of up to 60 structural and non-structural landslide risk mitigation options. - Development of an empirical model for assessing the changes in landslide frequency (hazard) as a function of changes in the demography and population density. - Case histories and "hotspots" of European Land¬slides have been collected and documented. Data for 41 potential case study sites have been compiled and summarized. These comprise 39 sites in Europe located in Italy, France, Norway, Switzerland, Austria, Andorra, and Romania; as well as one site in Canada and one in India. Almost every type of landslide and every type of movement is represented in these sites. - Research on stakeholder workshops and participatory processes to involve the population exposed to landslide risk in the decision-making process for choosing the most appropriate risk mitigation measure(s).
48 CFR 35.008 - Evaluation for award.
Code of Federal Regulations, 2010 CFR
2010-10-01
... reasonable but also to provide valuable insight into the offeror's understanding of the project, perception of risks, and ability to organize and perform the work. Cost or price analysis, as appropriate (see...
The Gap Analysis Program (GAP) is a national interagency program that maps the distribution of plant communities and selected animal species and compares these distributions with land stewardship to identify biotic elements at potential risk of endangerment. Acquisition of primar...
Decision Analysis Techniques for Adult Learners: Application to Leadership
ERIC Educational Resources Information Center
Toosi, Farah
2017-01-01
Most decision analysis techniques are not taught at higher education institutions. Leaders, project managers and procurement agents in industry have strong technical knowledge, and it is crucial for them to apply this knowledge at the right time to make critical decisions. There are uncertainties, problems, and risks involved in business…
NASA Astrophysics Data System (ADS)
Okolelova, Ella; Shibaeva, Marina; Shalnev, Oleg
2018-03-01
The article analyses risks in high-rise construction in terms of investment value with account of the maximum probable loss in case of risk event. The authors scrutinized the risks of high-rise construction in regions with various geographic, climatic and socio-economic conditions that may influence the project environment. Risk classification is presented in general terms, that includes aggregated characteristics of risks being common for many regions. Cluster analysis tools, that allow considering generalized groups of risk depending on their qualitative and quantitative features, were used in order to model the influence of the risk factors on the implementation of investment project. For convenience of further calculations, each type of risk is assigned a separate code with the number of the cluster and the subtype of risk. This approach and the coding of risk factors makes it possible to build a risk matrix, which greatly facilitates the task of determining the degree of impact of risks. The authors clarified and expanded the concept of the price risk, which is defined as the expected value of the event, 105 which extends the capabilities of the model, allows estimating an interval of the probability of occurrence and also using other probabilistic methods of calculation.
Improving Project Management with Simulation and Completion Distribution Functions
NASA Technical Reports Server (NTRS)
Cates, Grant R.
2004-01-01
Despite the critical importance of project completion timeliness, management practices in place today remain inadequate for addressing the persistent problem of project completion tardiness. A major culprit in late projects is uncertainty, which most, if not all, projects are inherently subject to. This uncertainty resides in the estimates for activity durations, the occurrence of unplanned and unforeseen events, and the availability of critical resources. In response to this problem, this research developed a comprehensive simulation based methodology for conducting quantitative project completion time risk analysis. It is called the Project Assessment by Simulation Technique (PAST). This new tool enables project stakeholders to visualize uncertainty or risk, i.e. the likelihood of their project completing late and the magnitude of the lateness, by providing them with a completion time distribution function of their projects. Discrete event simulation is used within PAST to determine the completion distribution function for the project of interest. The simulation is populated with both deterministic and stochastic elements. The deterministic inputs include planned project activities, precedence requirements, and resource requirements. The stochastic inputs include activity duration growth distributions, probabilities for events that can impact the project, and other dynamic constraints that may be placed upon project activities and milestones. These stochastic inputs are based upon past data from similar projects. The time for an entity to complete the simulation network, subject to both the deterministic and stochastic factors, represents the time to complete the project. Repeating the simulation hundreds or thousands of times allows one to create the project completion distribution function. The Project Assessment by Simulation Technique was demonstrated to be effective for the on-going NASA project to assemble the International Space Station. Approximately $500 million per month is being spent on this project, which is scheduled to complete by 2010. NASA project stakeholders participated in determining and managing completion distribution functions produced from PAST. The first result was that project stakeholders improved project completion risk awareness. Secondly, using PAST, mitigation options were analyzed to improve project completion performance and reduce total project cost.
Study on optimized decision-making model of offshore wind power projects investment
NASA Astrophysics Data System (ADS)
Zhao, Tian; Yang, Shangdong; Gao, Guowei; Ma, Li
2018-02-01
China’s offshore wind energy is of great potential and plays an important role in promoting China’s energy structure adjustment. However, the current development of offshore wind power in China is inadequate, and is much less developed than that of onshore wind power. On the basis of considering all kinds of risks faced by offshore wind power development, an optimized model of offshore wind power investment decision is established in this paper by proposing the risk-benefit assessment method. To prove the practicability of this method in improving the selection of wind power projects, python programming is used to simulate the investment analysis of a large number of projects. Therefore, the paper is dedicated to provide decision-making support for the sound development of offshore wind power industry.
Innes, Ev; Crowther, Amber; Fonti, Fiona; Quayle, Leonie
2010-01-01
OBJECTIVE/PARTICIPANTS: This report describes a project undertaken by three final (4th) year occupational therapy undergraduate students from the University of Sydney, Australia, in their final fieldwork placement. The project involved women from a Chinese background who worked on market gardens across the Sydney Basin. Its purpose was to identify musculoskeletal risks in the work environment and work practices of a selected group of seven Cantonese-speaking women working on market gardens in the Western Sydney region. The approaches used in the project reflected a risk management approach, and involved background research, initial interviews, task analysis, hazard identification, risk assessment, data analysis, identification of key issues, and developing recommendations, in collaboration with participants and consultation with professionals. The key issues identified as contributing factors to musculoskeletal pain and injuries were: (1) work practices (long work hours, repetitive work); (2) biomechanical factors (repetitive and sustained work postures, poor manual handling practices) and limited training; (3) ergonomics of the equipment used; (4) fatigue. Two priority areas for intervention were identified: (1) pain management, and (2) preventative strategies (improving both the work environment and work practices). Recommendations were made in collaboration with the women, and in consultation with health professionals.
Salgueiro, Ana Rita; Pereira, Henrique Garcia; Rico, Maria-Teresa; Benito, Gerado; Díez-Herreo, Andrés
2008-02-01
A new statistical approach for preliminary risk evaluation of breakage in tailings dam is presented and illustrated by a case study regarding the Mediterranean region. The objective of the proposed method is to establish an empirical scale of risk, from which guidelines for prioritizing the collection of further specific information can be derived. The method relies on a historical database containing, in essence, two sets of qualitative data: the first set concerns the variables that are observable before the disaster (e.g., type and size of the dam, its location, and state of activity), and the second refers to the consequences of the disaster (e.g., failure type, sludge characteristics, fatalities categorization, and downstream range of damage). Based on a modified form of correspondence analysis, where the second set of attributes are projected as "supplementary variables" onto the axes provided by the eigenvalue decomposition of the matrix referring to the first set, a "qualitative regression" is performed, relating the variables to be predicted (contained in the second set) with the "predictors" (the observable variables). On the grounds of the previously derived relationship, the risk of breakage in a new case can be evaluated, given observable variables. The method was applied in a case study regarding a set of 13 test sites where the ranking of risk obtained was validated by expert knowledge. Once validated, the procedure was included in the final output of the e-EcoRisk UE project (A Regional Enterprise Network Decision-Support System for Environmental Risk and Disaster Management of Large-Scale Industrial Spills), allowing for a dynamic historical database updating and providing a prompt rough risk evaluation for a new case. The aim of this section of the global project is to provide a quantified context where failure cases occurred in the past for supporting analogue reasoning in preventing similar situations.
Soller, Jeffrey A; Eftim, Sorina E; Nappier, Sharon P
2018-01-01
Understanding pathogen risks is a critically important consideration in the design of water treatment, particularly for potable reuse projects. As an extension to our published microbial risk assessment methodology to estimate infection risks associated with Direct Potable Reuse (DPR) treatment train unit process combinations, herein, we (1) provide an updated compilation of pathogen density data in raw wastewater and dose-response models; (2) conduct a series of sensitivity analyses to consider potential risk implications using updated data; (3) evaluate the risks associated with log credit allocations in the United States; and (4) identify reference pathogen reductions needed to consistently meet currently applied benchmark risk levels. Sensitivity analyses illustrated changes in cumulative annual risks estimates, the significance of which depends on the pathogen group driving the risk for a given treatment train. For example, updates to norovirus (NoV) raw wastewater values and use of a NoV dose-response approach, capturing the full range of uncertainty, increased risks associated with one of the treatment trains evaluated, but not the other. Additionally, compared to traditional log-credit allocation approaches, our results indicate that the risk methodology provides more nuanced information about how consistently public health benchmarks are achieved. Our results indicate that viruses need to be reduced by 14 logs or more to consistently achieve currently applied benchmark levels of protection associated with DPR. The refined methodology, updated model inputs, and log credit allocation comparisons will be useful to regulators considering DPR projects and design engineers as they consider which unit treatment processes should be employed for particular projects. Published by Elsevier Ltd.
Implementation of Risk Management in NASA's CEV Project- Ensuring Mission Success
NASA Astrophysics Data System (ADS)
Perera, Jeevan; Holsomback, Jerry D.
2005-12-01
Most project managers know that Risk Management (RM) is essential to good project management. At NASA, standards and procedures to manage risk through a tiered approach have been developed - from the global agency-wide requirements down to a program or project's implementation. The basic methodology for NASA's risk management strategy includes processes to identify, analyze, plan, track, control, communicate and document risks. The identification, characterization, mitigation plan, and mitigation responsibilities associated with specific risks are documented to help communicate, manage, and effectuate appropriate closure. This approach helps to ensure more consistent documentation and assessment and provides a means of archiving lessons learned for future identification or mitigation activities.A new risk database and management tool was developed by NASA in 2002 and since has been used successfully to communicate, document and manage a number of diverse risks for the International Space Station, Space Shuttle, and several other NASA projects and programs including at the Johnson Space Center. Organizations use this database application to effectively manage and track each risk and gain insight into impacts from other organization's viewpoint to develop integrated solutions. Schedule, cost, technical and safety issues are tracked in detail through this system.Risks are tagged within the system to ensure proper review, coordination and management at the necessary management level. The database is intended as a day-to- day tool for organizations to manage their risks and elevate those issues that need coordination from above. Each risk is assigned to a managing organization and a specific risk owner who generates mitigation plans as appropriate. In essence, the risk owner is responsible for shepherding the risk through closure. The individual that identifies a new risk does not necessarily get assigned as the risk owner. Whoever is in the best position to effectuate comprehensive closure is assigned as the risk owner. Each mitigation plan includes the specific tasks that will be conducted to either decrease the likelihood of the risk occurring and/or lessen the severity of the consequences if they do occur. As each mitigation task is completed, the responsible managing organization records the completion of the task in the risk database and then re-scores the risk considering the task's results. By keeping scores updated, a managing organization's current top risks and risk posture can be readily identified including the status of any risk in the system.A number of metrics measure risk process trends from data contained in the database. This allows for trend analysis to further identify improvements to the process and assist in the management of all risks. The metrics will also scrutinize both the effectiveness and compliance of risk management requirements.The risk database is an evolving tool and will be continuously improved with capabilities requested by the NASA project community. This paper presents the basic foundations of risk management, the elements necessary for effective risk management, and the capabilities of this new risk database and how it is implemented to support NASA's risk management needs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Copping, Andrea E.; Blake, Kara M.; Anderson, Richard M.
2011-09-01
Potential environmental effects of marine and hydrokinetic (MHK) energy development are not well understood, and yet regulatory agencies are required to make decisions in spite of substantial uncertainty about environmental impacts and their long-term consequences. An understanding of risks associated with interactions between MHK installations and aquatic receptors, including animals, habitats, and ecosystems, can help define key uncertainties and focus regulatory actions and scientific studies on interactions of most concern. As a first step in developing the Pacific Northwest National Laboratory (PNNL) Environmental Risk Evaluation System (ERES), PNNL scientists conducted a preliminary risk screening analysis on three initial MHK cases.more » During FY 2011, two additional cases were added: a tidal project in the Gulf of Maine using Ocean Renewable Power Company TidGenTM turbines and a wave project planned for the coast of Oregon using Aquamarine Oyster surge devices. Through an iterative process, the screening analysis revealed that top-tier stressors in the two FY 2011 cases were the dynamic effects of the device (e.g., strike), accidents/disasters, and effects of the static physical presence of the device (e.g., habitat alteration). Receptor interactions with these stressors at the highest tiers of risk were dominated by threatened and endangered animals. Risk to the physical environment from changes in flow regime also ranked high. Peer review of this process and results will be conducted in early FY 2012. The ERES screening analysis provides an analysis of vulnerability of environmental receptors to stressors associated with MHK installations, probability analysis is needed to determine specific risk levels to receptors. “Risk” has two components: (1) The likelihood, or “probability”, of the occurrence of a given interaction or event, and (2) the potential “consequence” if that interaction or event were to occur. During FY 2011, the ERES screening analysis focused primarily on the second component of risk, “consequence”, with focused probability analysis for interactions where data was sufficient for probability modeling. Consequence analysis provides an assessment of vulnerability of environmental receptors to stressors associated with MHK installations. Probability analysis is needed to determine specific risk levels to receptors and requires significant data inputs to drive risk models. During FY 2011, two stressor-receptor interactions were examined for the probability of occurrence. The two interactions (spill probability due to an encounter between a surface vessel and an MHK device; and toxicity from anti-biofouling paints on MHK devices) were seen to present relatively low risks to marine and freshwater receptors of greatest concern in siting and permitting MHK devices. A third probability analysis was scoped and initial steps taken to understand the risk of encounter between marine animals and rotating turbine blades. This analysis will be completed in FY 2012.« less
NASA Technical Reports Server (NTRS)
Johnson, Paul W.
2008-01-01
ePORT (electronic Project Online Risk Tool) provides a systematic approach to using an electronic database program to manage a program/project risk management processes. This presentation will briefly cover the standard risk management procedures, then thoroughly cover NASA's Risk Management tool called ePORT. This electronic Project Online Risk Tool (ePORT) is a web-based risk management program that provides a common framework to capture and manage risks, independent of a programs/projects size and budget. It is used to thoroughly cover the risk management paradigm providing standardized evaluation criterion for common management reporting, ePORT improves Product Line, Center and Corporate Management insight, simplifies program/project manager reporting, and maintains an archive of data for historical reference.
Development of funding project risk management tools.
DOT National Transportation Integrated Search
2013-11-01
Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...
NASA Astrophysics Data System (ADS)
Gordon, K.; Houser, T.; Kopp, R. E., III; Hsiang, S. M.; Larsen, K.; Jina, A.; Delgado, M.; Muir-Wood, R.; Rasmussen, D.; Rising, J.; Mastrandrea, M.; Wilson, P. S.
2014-12-01
The United States faces a range of economic risks from global climate change - from increased flooding and storm damage, to climate-driven changes in crop yields and labor productivity, to heat-related strains on energy and public health systems. The Risky Business Project commissioned a groundbreaking new analysis of these and other climate risks by region of the country and sector of the economy. The American Climate Prospectus (ACP) links state-of-the-art climate models with econometric research of human responses to climate variability and cutting edge private sector risk assessment tools, the ACP offers decision-makers a data driven assessment of the specific risks they face. We describe the challenge, methods, findings, and policy implications of the national risk analysis, with particular focus on methodological innovations and novel insights.
Shortcuts in complex engineering systems: a principal-agent approach to risk management.
Garber, Russ; Paté-Cornell, Elisabeth
2012-05-01
In this article, we examine the effects of shortcuts in the development of engineered systems through a principal-agent model. We find that occurrences of illicit shortcuts are closely related to the incentive structure and to the level of effort that the agent is willing to expend from the beginning of the project to remain on schedule. Using a probabilistic risk analysis to determine the risks of system failure from these shortcuts, we show how a principal can choose optimal settings (payments, penalties, and inspections) that can deter an agent from cutting corners and maximize the principal's value through increased agent effort. We analyze the problem for an agent with limited liability. We consider first the case where he is risk neutral; we then include the case where he is risk averse. © 2011 Society for Risk Analysis.
RISK MANAGEMENT USING PROJECT RECON
2016-11-28
Risk Management Using Project Recon UNCLASSIFIED: Distribution Statement A. Approved for public release; distribution is unlimited. Bonnie Leece... Project Recon Lead What is Project Recon? • A web-based GOTS tool designed to capture, manage, and link Risks, Issues, and Opportunities in a...centralized database. • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any
NASA Technical Reports Server (NTRS)
Deckert, George
2010-01-01
This viewgraph presentation reviews The NASA Hazard Analysis process. The contents include: 1) Significant Incidents and Close Calls in Human Spaceflight; 2) Subsystem Safety Engineering Through the Project Life Cycle; 3) The Risk Informed Design Process; 4) Types of NASA Hazard Analysis; 5) Preliminary Hazard Analysis (PHA); 6) Hazard Analysis Process; 7) Identify Hazardous Conditions; 8) Consider All Interfaces; 9) Work a Preliminary Hazard List; 10) NASA Generic Hazards List; and 11) Final Thoughts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jordan, Teresa E.; Richards, Maria C.; Horowitz, Franklin G.
Geothermal energy is an attractive sustainable energy source. Yet project developers need confirmation of the resource base to warrant their time and financial resources. The Geothermal Play Fairway Analysis of the Appalachian Basin evaluated risk metrics that communicate the favorability of potential low-temperature geothermal energy resources in reservoirs more than 1000 m below the surface. This analysis is focused on the direct use of the heat, rather than on electricity production. Four risk factors of concern for direct-use geothermal plays in the Appalachian Basin portions of New York, Pennsylvania, and West Virginia are examined individually, and then in combination: 1)more » thermal resource quality, 2) natural reservoir quality, 3) induced seismicity, and 4) utilization opportunities. Uncertainty in the risk estimation is quantified. Based on these metrics, geothermal plays in the Appalachian Basin were identified as potentially viable for a variety of direct-use-heat applications. The methodologies developed in this project may be applied in other sedimentary basins as a foundation for low temperature (50-150 °C), direct use geothermal resource, risk, and uncertainty assessment. Three methods with which to combine the four risk factors were used. Among these, the averaging of the individual risk factors indicates the most favorable counties within the study area are the West Virginia counties of Monongalia, Harrison, Lewis (dubbed the Morgantown–Clarksburg play fairway), Putnam, and Kanawha (Charleston play fairway), the New York counties of Chemung and Steuben plus adjacent Bradford county in Pennsylvania (Corning–Ithaca play fairway), and the Pennsylvania counties of Mercer, Crawford, Erie, and Warren, and adjacent Chautauqua county in New York (together, the Meadville–Jamestown play fairway). These higher priority regions are surrounded by broader medium priority zones. Also worthy of additional exploration is a broad region near Pittsburgh Pennsylvania, for which the available geological data are insufficient to fully analyze the geological risks but yet the population is high. First, to assess the spatial variation in the depth to which one would need to drill to obtain geothermal temperatures that are useful to a future project, the project used bottom-hole temperature data from Appalachian Basin oil and gas exploration. These bottom hole temperature data are abundant but of low quality. Second, the project examined the potential for sufficient water flow rates through rocks to harvest heat from a geothermal well field, considering only natural reservoirs. This analysis provides a very incomplete picture of spatial variability of natural reservoirs because the oil and gas reservoir data lack key properties and are spatially biased toward those locations with profitable amounts of hydrocarbons in the rock pore spaces. Third, in light of the fact that earthquake activity has been induced in several states by subsurface work related to the oil and gas industry, this project examined the potential for similar activity in the Appalachian Basin. Acknowledging that data for such a task are insufficient, we utilized what was available: records of seismic activity, regional estimates of the orientations of stress in the rocks, and locations and orientations of zones of lateral change in rock properties at depths down to several kilometers below Earth’s surface. With these data, we created a first approximation of spatially variable risks for induced earthquakes. Because no data existed with which to test the reliability of these methods, the results have a high degree of uncertainty. Fourth, we examined the spatial variability of the above-the-ground factors that contribute to the economical viability of projects to tap low-temperature geothermal resources for direct-use. We worked principally with population density as a regionally known variable that would impact the cost of district heating. The resulting maps omit the costs of producing the hot water from the ground, because the below-ground costs are directly coupled to the thermal resource risk factor and natural reservoir risk factor – later analyses of those costs will be needed. The result of the district heating analysis is highly skewed: few census locations yielded a low estimated surface cost. The team also identified more than 165 prospects for high value direct-use geothermal energy opportunities such as industrial sites, university campuses, and federal facilities, among others. At the closure of this regional analysis, the most significant technical uncertainties are 1) reservoir distribution and capacities; 2) validity of thermal resource maps, and 3) the holistic estimation of Levelized Cost of Heat for favorable geological situations.« less
NASA Astrophysics Data System (ADS)
Vaynshtok, Natalia
2017-10-01
The article provides the results of development of the methodology for construction compliance monitoring in the crediting of investment projects for road construction. Work scope analysis of construction audit was conducted and an algorithm of financial audit in the crediting investment projects was developed. Furthermore, the possible pitfalls and abuses of counterparties were investigated and recommendations were given allowing the bank to receive objective and independent information on the progress of the project in real time. This mechanism is useful for the bank in insurance of possible risks, targeted and rational use of credit funds.
Analysis of Potentially Hazardous Asteroids
NASA Technical Reports Server (NTRS)
Arnold, J. O.; Burkhard, C. D.; Dotson, J. L.; Prabhu, D. K.; Mathias, D. L.; Aftosmis, M. J.; Venkatapathy, Ethiraj; Morrison, D. D.; Sears, D. W. G.; Berger, M. J.
2015-01-01
The National Aeronautics and Space Administration initiated a new project focused on Planetary Defense on October 1, 2014. The new project is funded by NASAs Near Earth Object Program (Lindley Johnson, Program Executive). This presentation describes the objectives, functions and plans of four tasks encompassed in the new project and their inter-relations. Additionally, this project provides for outreach to facilitate partnerships with other organizations to help meet the objectives of the planetary defense community. The four tasks are (1) Characterization of Near Earth Asteroids, (2) Physics-Based Modeling of Meteor Entry and Breakup (3) Surface Impact Modeling and (4) Physics-Based Impact Risk Assessment.
SAMCO: Society Adaptation for coping with Mountain risks in a global change COntext
NASA Astrophysics Data System (ADS)
Grandjean, Gilles; Bernardie, Severine; Malet, Jean-Philippe; Puissant, Anne; Houet, Thomas; Berger, Frederic; Fort, Monique; Pierre, Daniel
2013-04-01
The SAMCO project aims to develop a proactive resilience framework enhancing the overall resilience of societies on the impacts of mountain risks. The project aims to elaborate methodological tools to characterize and measure ecosystem and societal resilience from an operative perspective on three mountain representative case studies. To achieve this objective, the methodology is split in several points with (1) the definition of the potential impacts of global environmental changes (climate system, ecosystem e.g. land use, socio-economic system) on landslide hazards, (2) the analysis of these consequences in terms of vulnerability (e.g. changes in the location and characteristics of the impacted areas and level of their perturbation) and (3) the implementation of a methodology for quantitatively investigating and mapping indicators of mountain slope vulnerability exposed to several hazard types, and the development of a GIS-based demonstration platform. The strength and originality of the SAMCO project will be to combine different techniques, methodologies and models (multi-hazard assessment, risk evolution in time, vulnerability functional analysis, and governance strategies) and to gather various interdisciplinary expertises in earth sciences, environmental sciences, and social sciences. The multidisciplinary background of the members could potentially lead to the development of new concepts and emerging strategies for mountain hazard/risk adaptation. Research areas, characterized by a variety of environmental, economical and social settings, are severely affected by landslides, and have experienced significant land use modifications (reforestation, abandonment of traditional agricultural practices) and human interferences (urban expansion, ski resorts construction) over the last century.
Hood, W L; Loughery, C V
1990-05-01
Stewards of Catholic healthcare organizations must proceed cautiously before embarking on new construction or renovation projects. Many important issues are involved in financing such projects, including business risk, financial philosophy, financial structure, and forms of debt. The proper foundation for any financing structure must begin with financial philosophy. Some healthcare facilities have traditionally used no external financing; others have employed significant levels of debt. To determine a proper level of debt for the project(s) being financed, it is important to look at business risk. If a modest decline in revenues (or a similar increase in costs) would threaten the project's viability, the business risk would be high; therefore prudence would dictate that the level of debt undertaken be relatively small. A separate analysis is required to determine the appropriate mix of floating-rate and fixed-rate long-term debt. As a rule of thumb, fixed-rate debt would typically form two thirds of the debt structure; floating-rate debt, no more than one third. For healthcare, debt can take two forms: tax exempt and taxable. Tax-exempt financing has many constraints, including use of proceeds by a tax-exempt entity, arbitrage rules, tax legislation, and financial disclosure laws. Taxable debt can be issued by private placement or on a publicly traded basis.
A History of Sandia’s Water Decision Modeling and Analysis Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lowry, Thomas Stephen; Pate, Ronald C.
This document provides a brief narrative, and selected project descriptions, that represent Sandia’s history involving data, modeling, and analysis related to water, energy-water nexus, and energy-water-agriculture nexus within the context of climate change. Sandia National Laboratories has been engaged since the early-1990s with program development involving data, modeling, and analysis projects that address the interdependent issues, risks, and technology-based mitigations associated with increasing demands and stresses being placed on energy, water, and agricultural/food resources, and the related impacts on their security and sustainability in the face of both domestic and global population growth, expanding economic development, and climate change.
Payne-Sturges, Devon C; Korfmacher, Katrina Smith; Cory-Slechta, Deborah A; Jimenez, Maria; Symanski, Elaine; Carr Shmool, Jessie L; Dotson-Newman, Ogonnaya; Clougherty, Jane E; French, Robert; Levy, Jonathan I; Laumbach, Robert; Rodgers, Kathryn; Bongiovanni, Roseann; Scammell, Madeleine K
2015-12-01
Studies have documented cumulative health effects of chemical and nonchemical exposures, particularly chronic environmental and social stressors. Environmental justice groups have advocated for community participation in research that assesses how these interactions contribute to health disparities experienced by low-income and communities of color. In 2009, the U.S. Environmental Protection Agency issued a request for research applications (RFA), "Understanding the Role of Nonchemical Stressors and Developing Analytic Methods for Cumulative Risk Assessments." Seven research projects were funded to help address this knowledge gap. Each engaged with communities in different ways. We describe the community engagement approaches of the seven research projects, which ranged from outreach through shared leadership/participatory. We then assess the experiences of these programs with respect to the community engagement goals of the RFA. We present insights from these community engagement efforts, including how the grants helped to build or enhance the capacity of community organizations in addition to contributing to the research projects. Our analysis of project proposals, annual grantee reports, and participant observation of these seven projects suggests guidelines for the development of future funding mechanisms and for conducting community-engaged research on cumulative risk involving environmental and social stressors including: 1) providing for flexibility in the mode of community engagement; 2) addressing conflict between research timing and engagement needs, 3) developing approaches for communicating about the uniquely sensitive issues of nonchemical stressors and social risks; and 4) encouraging the evaluation of community engagement efforts.
ERIC Educational Resources Information Center
Kingdon, Danielle; Serbin, Lisa A.; Stack, Dale M.
2017-01-01
Internationally, girls outperform boys in overall school performance. The gender gap is particularly large among those in at-risk groups, such as children from families at economic disadvantage. This study modeled the academic trajectories of a low-income sample of boys and girls from the Concordia Longitudinal Risk Project across the full course…
Multimodal Retrospective and Prospective Unit-Level Analysis of Military Workplace Violence
2015-10-01
Disciplinary infractions, minor crimes, PTSD and other mental problems, and substance abuse will increase MWV; 3. Treatment and social support will...Disorder Risk Taking Behaviors Risk Factors Protective Factors Social Support Mental Health Substance Abuse 2 3. OVERALL PROJECT SUMMARY The...potential predictors of MWV. These intervening outcomes include PTSD and other mental health issues, substance abuse , disciplinary infractions, and
Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective
NASA Astrophysics Data System (ADS)
Subramanyam, K.; Haridharan, M. K.
2017-07-01
Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.
Sexual HIV Risk Among Male Parolees and Their Female Partners: The Relate Project
Comfort, Megan; Reznick, Olga Grinstead; Dilworth, Samantha E.; Binson, Diane; Darbes, Lynae A.; Neilands, Torsten B.
2014-01-01
Background The massively disproportionate impact of America’s prison boom on communities of color has raised questions about how incarceration may affect health disparities, including disparities in HIV. Primary partners are an important source of influence on sexual health. In this paper, we investigate sexual HIV risk among male-female couples following a man’s release from prison. Methods We draw upon data from the Relate Project, a novel cross-sectional survey of recently released men and their female partners in Oakland and San Francisco, California (N=344). Inferential analyses use the actor-partner model to explore actor and partner effects on sexual HIV risk outcomes. Results Dyadic analyses of sexual HIV risk among male parolees and their female partners paint a complex portrait of couples affected by incarceration and of partners’ influences on each other. Findings indicate that demographic factors such as education level and employment status, individual psycho-social factors such as perception of risk, and relationship factors such as commitment and power affect sexual HIV risk outcomes. Conclusion The Relate Project provides a novel dataset for the dyadic analysis of sexual risk among male parolees and their female partners, and results highlight the importance of focusing on the couple as a unit when assessing HIV risk and protective behaviors. Results also indicate potentially fruitful avenues for population-specific interventions that may help to reduce sexual health disparities among couples affected by incarceration. PMID:25642396
Why Don't They Just Give Us Money? Project Cost Estimating and Cost Reporting
NASA Technical Reports Server (NTRS)
Comstock, Douglas A.; Van Wychen, Kristin; Zimmerman, Mary Beth
2015-01-01
Successful projects require an integrated approach to managing cost, schedule, and risk. This is especially true for complex, multi-year projects involving multiple organizations. To explore solutions and leverage valuable lessons learned, NASA's Virtual Project Management Challenge will kick off a three-part series examining some of the challenges faced by project and program managers when it comes to managing these important elements. In this first session of the series, we will look at cost management, with an emphasis on the critical roles of cost estimating and cost reporting. By taking a proactive approach to both of these activities, project managers can better control life cycle costs, maintain stakeholder confidence, and protect other current and future projects in the organization's portfolio. Speakers will be Doug Comstock, Director of NASA's Cost Analysis Division, Kristin Van Wychen, Senior Analyst in the GAO Acquisition and Sourcing Management Team, and Mary Beth Zimmerman, Branch Chief for NASA's Portfolio Analysis Branch, Strategic Investments Division. Moderator Ramien Pierre is from NASA's Academy for Program/Project and Engineering Leadership (APPEL).
Intimate Partner Violence and HIV Risk Behaviors Among Socially Disadvantaged Chilean Women
Miner, Sarah; Ferrer, Lilian; Cianelli, Rosina; Bernales, Margarita; Cabieses, Báltica
2012-01-01
The objective of this study was to determine if a relationship exists between intimate partner violence (IPV) and HIV risk among socioeconomically disadvantaged Chilean women. A correlational analysis with data from the NIH-funded project, “Testing an HIV/AIDS Prevention Intervention for Chilean Women,” was conducted. Two hundred and sixtyone women were included in this analysis (n = 261). Those women who had experienced any type of IPV in the past 3 months had significantly higher risk for HIV than those who had not (t = −2.016, p < .05). Also a linear trend was found among those women who had experienced more than one type of IPV in the past 3 months and HIV risk. PMID:21486859
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jones, Katherine A.; DeMenno, Mercy; Hoffman, Matthew John
This report summarizes the work performed as part of a Laboratory Directed Research and Development project focused on evaluating and mitigating risk associated with biological dual use research of concern. The academic and scientific community has identified the funding stage as the appropriate place to intervene and mitigate risk, so the framework developed here uses a portfolio-level approach and balances biosafety and biosecurity risks, anticipated project benefits, and available mitigations to identify the best available investment strategies subject to cost constraints. The modeling toolkit was designed for decision analysis for dual use research of concern, but is flexible enough tomore » support a wide variety of portfolio-level funding decisions where risk/benefit tradeoffs are involved. Two mathematical optimization models with two solution methods are included to accommodate stakeholders with varying levels of certainty about priorities between metrics. An example case study is presented.« less
States at Risk: America's Preparedness Report Card
NASA Astrophysics Data System (ADS)
Yu, R. M. S.; Strauss, B.; Kulp, S. A.; Bronzan, J.; Rodehorst, B.; Bhat, C.; Dix, B.; Savonis, M.; Wiles, R.
2015-12-01
Many states are already experiencing the costly impacts of extreme climate and weather events. The occurrence, frequency and intensity of these events may change under future climates. Preparing for these changes takes time, and state government agencies and communities need to recognize the risks they could potentially face and the response actions already undertaken. The States at Risk: America's Preparedness Report Card project is the first-ever study that quantifies five climate-change-driven hazards, and the relevant state government response actions in each of the 50 states. The changing characteristics of extreme heat, drought, wildfires, inland and coastal flooding were assessed for the baseline period (around year 2000) through the years 2030 and 2050 across all 50 states. Bias-corrected statistically-downscaled (BCSD) climate projections (Reclamation, 2013) and hydrology projections (Reclamation, 2014) from the Coupled Model Intercomparison Project phase 5 (CMIP5) under RCP8.5 were used. The climate change response action analysis covers five critical sectors: Transportation, Energy, Water, Human Health and Communities. It examined whether there is evidence that the state is taking action to (1) reduce current risks, (2) raise its awareness of future risks, (3) plan for adaptation to the future risks, and (4) implement specific actions to reduce future risks for each applicable hazards. Results from the two analyses were aggregated and translated into a rating system that standardizes assessments across states, which can be easily understood by both technical and non-technical audiences. The findings in this study not only serve as a screening tool for states to recognize the hazards they could potentially face as climate changes, but also serve as a roadmap for states to address the gaps in response actions, and to improve climate preparedness and resilience.
NASA Astrophysics Data System (ADS)
Krechowicz, Maria
2017-10-01
Many construction projects fail to meet deadlines or they exceed the assumed budget. This scenario is particularly common in the case of innovative projects, in which too late identification of a high risk of delays and exceeding the assumed costs makes a potentially profitable project untenable. A high risk level, far exceeding the level of risk in standard non-innovative projects, is a characteristic feature of the realization phase of innovative projects. This is associated not only with greater complexity of the design and construction phases, but also with the problems with application of new technologies and prototype solutions, lack of qualified personnel with suitable expertise in specialized areas, and with the ability to properly identify the gaps between available and required knowledge and skills. This paper discusses the process of effective risk management in innovative projects on the example of the realization phase of an innovative, energy-efficient and sustainable building of the Laboratory of Intelligent Building in Cracow - DLJM Lab, from the point of view of DORBUD S.A., its general contractor. In this paper, a new approach to risk management process for innovative construction projects is proposed. Risk management process was divided into five stages: gathering information, identification of the important unwanted events, first risk assessment, development and choice of risk reaction strategies, assessment of the residual risk after introducing risk reactions. 18 unwanted events in an innovative construction project were identified. The first risk assessment was carried out using two-parametric risk matrix, in which the probability of unwanted event occurrence and its consequences were analysed. Three levels of risks were defined: tolerable, controlled and uncontrolled. Risk reactions to each defined unwanted event were developed. The following risk reaction types were considered: risk retention, risk reduction, risk transfer and risk elimination. Three-parametric risk matrix was developed to make it possible to assess risk after implementing risk reactions. The possibility of implementing risk management was inversely proportional to the probability of unwanted event occurrence and its contribution to the project outcome. Introducing this risk management strategy allowed to significantly reduce the risk of the innovative construction project. It proved to be an effective tool to reduce risk to an acceptable level. It had a significant contribution to carrying out the project within the assumed time, budget and quality standards.
An Independent Evaluation of the FMEA/CIL Hazard Analysis Alternative Study
NASA Technical Reports Server (NTRS)
Ray, Paul S.
1996-01-01
The present instruments of safety and reliability risk control for a majority of the National Aeronautics and Space Administration (NASA) programs/projects consist of Failure Mode and Effects Analysis (FMEA), Hazard Analysis (HA), Critical Items List (CIL), and Hazard Report (HR). This extensive analytical approach was introduced in the early 1970's and was implemented for the Space Shuttle Program by NHB 5300.4 (1D-2. Since the Challenger accident in 1986, the process has been expanded considerably and resulted in introduction of similar and/or duplicated activities in the safety/reliability risk analysis. A study initiated in 1995, to search for an alternative to the current FMEA/CIL Hazard Analysis methodology generated a proposed method on April 30, 1996. The objective of this Summer Faculty Study was to participate in and conduct an independent evaluation of the proposed alternative to simplify the present safety and reliability risk control procedure.
The Gap Analysis Program (GAP) is a national interagency progranl that maps the distribution of plant communities and selected animal species and compares these distributions with land stewardship to identify biotic elements at potential risk of endangerment. GAP uses remote sens...
Nitride, Chiara; Lee, Victoria; Baricevic-Jones, Ivona; Adel-Patient, Karine; Baumgartner, Sabine; Mills, E N Clare
2018-01-01
Allergen analysis is central to implementing and monitoring food allergen risk assessment and management processes by the food industry, but current methods for the determination of allergens in foods give highly variable results. The European Union-funded "Integrated Approaches to Food Allergen and Allergy Risk Management" (iFAAM) project has been working to address gaps in knowledge regarding food allergen management and analysis, including the development of novel MS and immuno-based allergen determination methods. Common allergenic food ingredients (peanut, hazelnut, walnut, cow's milk [Bos domesticus], and hen's egg [Gallus domesticus]) and common food matrixes (chocolate dessert and cookie) have been used for both clinical studies and analytical method development to ensure that the new methods are clinically relevant. Allergen molecules have been used as analytical targets and allergenic ingredients incurred into matrixes at levels close to reference doses that may trigger the use of precautionary allergen labeling. An interlaboratory method comparison has been undertaken for the determination of peanut in chocolate dessert using MS and immuno-based methods. The iFAAM approach has highlighted the need for methods to report test results in allergenic protein. This will allow food business operators to use them in risk assessments that are founded on clinical study data in which protein has been used as a measure of allergenic potency.
NASA Astrophysics Data System (ADS)
Strauss, B.; Dodson, D.; Kulp, S. A.; Rizza, D. H.
2016-12-01
Surging Seas Risk Finder (riskfinder.org) is an online tool for accessing extensive local projections and analysis of sea level rise; coastal floods; and land, populations, contamination sources, and infrastructure and other assets that may be exposed to inundation. Risk Finder was first published in 2013 for Florida, New York and New Jersey, expanding to all states in the contiguous U.S. by 2016, when a major new version of the tool was released with a completely new interface. The revised tool was informed by hundreds of survey responses from and conversations with planners, local officials and other coastal stakeholders, plus consideration of modern best practices for responsive web design and user interfaces, and social science-based principles for science communication. Overarching design principles include simplicity and ease of navigation, leading to a landing page with Google-like sparsity and focus on search, and to an architecture based on search, so that each coastal zip code, city, county, state or other place type has its own webpage gathering all relevant analysis in modular, scrollable units. Millions of users have visited the Surging Seas suite of tools to date, and downloaded thousands of files, for stated purposes ranging from planning to business to education to personal decisions; and from institutions ranging from local to federal government agencies, to businesses, to NGOs, and to academia.
NASA Astrophysics Data System (ADS)
Hasan, M. A.; Akanda, A. S.; Jutla, A.; Huq, A.; Colwell, R. R.
2017-12-01
Diarrheal diseases remain a major threat to global public health and are the second largest cause of death for children under the age of five. Cholera and Rotavirus diarrhea together comprise more than two-thirds of the diarrheal morbidity in South Asia. Recent studies have shown strong influences of hydrologic processes and climatic variabilities on the onset, intensity, and seasonality of the outbreaks of these diseases. However, our understanding of the propagation and manifestation of these diseases in a changing climate in vulnerable regions of the world are still limited. In this study, we build on our understanding of the role of the hydro-climatic drivers of diarrheal diseases in South Asia in recent decades to project the probable risks of the diseases in this century using the climate projection scenarios from dynamically downscaled climate models. To build the current model, we conducted a multivariate logistic regression assessment using 34 climate indices to examine the role of temperature and rainfall extremes over the seasonality of rotavirus and cholera over a South Asian country, Bangladesh. We utilize the availability of long and reliable time-series of cholera and rotavirus from Bangladesh and conducted a temporal and spatial analysis derived from both ground and satellite observations. For projecting the future risks of the diseases, we used five bias-corrected Regional Climate Model (RCM) results of the CMIP5 series under the RCP 4.5 scenario. Cholera risk shows a significantly higher rate of increase compared to Rotavirus in Bangladesh in the 21st century. As the disease is significantly influenced by extreme rainfall, majority projections showed a significant increase in flood-driven cholera risk. Most RCMs suggest a warmer winter in future years, suggesting reduced risk for Rotavirus. However, as the dryness of the climate is also highly correlated with rotavirus epidemics, the incremental risk of the disease due to drier winters would likely undermine the reduced risk due to temperature increase. Probabilistic risk assessments of these diarrheal diseases with respect to hydro-climatic variability will, not only improve the local policymaking processes, but also allow us to pinpoint the climate-health hotspots around the globe.
Crookes, D J; Blignaut, J N; de Wit, M P; Esler, K J; Le Maitre, D C; Milton, S J; Mitchell, S A; Cloete, J; de Abreu, P; Fourie nee Vlok, H; Gull, K; Marx, D; Mugido, W; Ndhlovu, T; Nowell, M; Pauw, M; Rebelo, A
2013-05-15
Can markets assist by providing support for ecological restoration, and if so, under what conditions? The first step in addressing this question is to develop a consistent methodology for economic evaluation of ecological restoration projects. A risk analysis process was followed in which a system dynamics model was constructed for eight diverse case study sites where ecological restoration is currently being pursued. Restoration costs vary across each of these sites, as do the benefits associated with restored ecosystem functioning. The system dynamics model simulates the ecological, hydrological and economic benefits of ecological restoration and informs a portfolio mapping exercise where payoffs are matched against the likelihood of success of a project, as well as a number of other factors (such as project costs and risk measures). This is the first known application that couples ecological restoration with system dynamics and portfolio mapping. The results suggest an approach that is able to move beyond traditional indicators of project success, since the effect of discounting is virtually eliminated. We conclude that systems dynamic modelling with portfolio mapping can guide decisions on when markets for restoration activities may be feasible. Copyright © 2013 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Geldiyev, P.
2017-12-01
Rapid urban development and changing climate influences the frequency and magnitude of flooding in Houston area. This proposed project aims to evaluate the flooding risks with the current and future land use changes by 2040 for one subbasin of the San Jacinto Brazos/Neches-Trinity Coastal basin. Surface environments and streamflow data of the Clear Creek are analyzed and stimulated to discuss the possible impact of urbanization on the occurrence of floods. The streamflow data is analyzed and simulated with the application of the Geographic Information Systems and its extensions. Both hydrologic and hydraulic models of the Clear Creek are created with the use of HEC-HMS and HEC-RAS software. Both models are duplicated for the year 2040, based on projected 2040 Landcover Maps developed by Houston and Galveston Area Council. This project examines a type of contemporary hydrologic disturbance and the interaction between land cover and changes in hydrological processes. Expected results will be very significant for urban development and flooding management.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lottes, S.A.; Bojanowski, C.; Shen, J.
2012-04-09
The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. Themore » analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water effects on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to improve design allowing for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, CFD analysis of the operation of the wind tunnel in the TFHRC wind engineering laboratory. This quarterly report documents technical progress on the project tasks for the period of October through December 2011.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lottes, S.A.; Bojanowski, C.; Shen, J.
2012-06-28
The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. Themore » analysis methods employ well benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water effects on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to improve design allowing for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, CFD analysis of the operation of the wind tunnel in the TFHRC wind engineering laboratory. This quarterly report documents technical progress on the project tasks for the period of January through March 2012.« less
CO 2 Sequestration and Enhanced Oil Recovery at Depleted Oil/Gas Reservoirs
Dai, Zhenxue; Viswanathan, Hari; Xiao, Ting; ...
2017-08-18
This study presents a quantitative evaluation of the operational and technical risks of an active CO 2-EOR project. A set of risk factor metrics is defined to post-process the Monte Carlo (MC) simulations for statistical analysis. The risk factors are expressed as measurable quantities that can be used to gain insight into project risk (e.g. environmental and economic risks) without the need to generate a rigorous consequence structure, which include (a) CO 2 injection rate, (b) net CO 2 injection rate, (c) cumulative CO 2 storage, (d) cumulative water injection, (e) oil production rate, (f) cumulative oil production, (g) cumulativemore » CH 4 production, and (h) CO 2 breakthrough time. The Morrow reservoir at the Farnsworth Unit (FWU) site, Texas, is used as an example for studying the multi-scale statistical approach for CO 2 accounting and risk analysis. A set of geostatistical-based MC simulations of CO 2-oil/gas-water flow and transport in the Morrow formation are conducted for evaluating the risk metrics. A response-surface-based economic model has been derived to calculate the CO 2-EOR profitability for the FWU site with a current oil price, which suggests that approximately 31% of the 1000 realizations can be profitable. If government carbon-tax credits are available, or the oil price goes up or CO 2 capture and operating expenses reduce, more realizations would be profitable.« less
CO 2 Sequestration and Enhanced Oil Recovery at Depleted Oil/Gas Reservoirs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dai, Zhenxue; Viswanathan, Hari; Xiao, Ting
This study presents a quantitative evaluation of the operational and technical risks of an active CO 2-EOR project. A set of risk factor metrics is defined to post-process the Monte Carlo (MC) simulations for statistical analysis. The risk factors are expressed as measurable quantities that can be used to gain insight into project risk (e.g. environmental and economic risks) without the need to generate a rigorous consequence structure, which include (a) CO 2 injection rate, (b) net CO 2 injection rate, (c) cumulative CO 2 storage, (d) cumulative water injection, (e) oil production rate, (f) cumulative oil production, (g) cumulativemore » CH 4 production, and (h) CO 2 breakthrough time. The Morrow reservoir at the Farnsworth Unit (FWU) site, Texas, is used as an example for studying the multi-scale statistical approach for CO 2 accounting and risk analysis. A set of geostatistical-based MC simulations of CO 2-oil/gas-water flow and transport in the Morrow formation are conducted for evaluating the risk metrics. A response-surface-based economic model has been derived to calculate the CO 2-EOR profitability for the FWU site with a current oil price, which suggests that approximately 31% of the 1000 realizations can be profitable. If government carbon-tax credits are available, or the oil price goes up or CO 2 capture and operating expenses reduce, more realizations would be profitable.« less
Riley, Emily; Harris, Patrick; Kent, Jennifer; Sainsbury, Peter; Lane, Anna; Baum, Fran
2018-01-01
Background: Transport policy and practice impacts health. Environmental Impact Assessments (EIAs) are regulated public policy mechanisms that can be used to consider the health impacts of major transport projects before they are approved. The way health is considered in these environmental assessments (EAs) is not well known. This research asked: How and to what extent was human health considered in EAs of four major transport projects in Australia. Methods: We developed a comprehensive coding framework to analyse the Environmental Impact Statements (EISs) of four transport infrastructure projects: three road and one light rail. The coding framework was designed to capture how health was directly and indirectly included. Results: We found that health was partially considered in all four EISs. In the three New South Wales (NSW) projects, but not the one South Australian project, this was influenced by the requirements issued to proponents by the government which directed the content of the EIS. Health was assessed using human health risk assessment (HHRA). We found this to be narrow in focus and revealed a need for a broader social determinants of health approach, using multiple methods. The road assessments emphasised air quality and noise risks, concluding these were minimal or predicted to improve. The South Australian project was the only road project not to include health data explicitly. The light rail EIS considered the health benefits of the project whereas the others focused on risk. Only one project considered mental health, although in less detail than air quality or noise. Conclusion: Our findings suggest EIAs lag behind the known evidence linking transport infrastructure to health. If health is to be comprehensively included, a more complete model of health is required, as well as a shift away from health risk assessment as the main method used. This needs to be mandatory for all significant developments. We also found that considering health only at the EIA stage may be a significant limitation, and there is a need for health issues to be considered when earlier, fundamental decisions about the project are being made. PMID:29524938
Robotic Lunar Lander Development Project Status
NASA Technical Reports Server (NTRS)
Hammond, Monica; Bassler, Julie; Morse, Brian
2010-01-01
This slide presentation reviews the status of the development of a robotic lunar lander. The goal of the project is to perform engineering tests and risk reduction activities to support the development of a small lunar lander for lunar surface science. This includes: (1) risk reduction for the flight of the robotic lander, (i.e., testing and analyzing various phase of the project); (2) the incremental development for the design of the robotic lander, which is to demonstrate autonomous, controlled descent and landing on airless bodies, and design of thruster configuration for 1/6th of the gravity of earth; (3) cold gas test article in flight demonstration testing; (4) warm gas testing of the robotic lander design; (5) develop and test landing algorithms; (6) validate the algorithms through analysis and test; and (7) tests of the flight propulsion system.
A Case Study of Measuring Process Risk for Early Insights into Software Safety
NASA Technical Reports Server (NTRS)
Layman, Lucas; Basili, Victor; Zelkowitz, Marvin V.; Fisher, Karen L.
2011-01-01
In this case study, we examine software safety risk in three flight hardware systems in NASA's Constellation spaceflight program. We applied our Technical and Process Risk Measurement (TPRM) methodology to the Constellation hazard analysis process to quantify the technical and process risks involving software safety in the early design phase of these projects. We analyzed 154 hazard reports and collected metrics to measure the prevalence of software in hazards and the specificity of descriptions of software causes of hazardous conditions. We found that 49-70% of 154 hazardous conditions could be caused by software or software was involved in the prevention of the hazardous condition. We also found that 12-17% of the 2013 hazard causes involved software, and that 23-29% of all causes had a software control. The application of the TPRM methodology identified process risks in the application of the hazard analysis process itself that may lead to software safety risk.
Risk Analysis of Return Support Material on Gas Compressor Platform Project
NASA Astrophysics Data System (ADS)
Silvianita; Aulia, B. U.; Khakim, M. L. N.; Rosyid, Daniel M.
2017-07-01
On a fixed platforms project are not only carried out by a contractor, but two or more contractors. Cooperation in the construction of fixed platforms is often not according to plan, it is caused by several factors. It takes a good synergy between the contractor to avoid miss communication may cause problems on the project. For the example is about support material (sea fastening, skid shoe and shipping support) used in the process of sending a jacket structure to operation place often does not return to the contractor. It needs a systematic method to overcome the problem of support material. This paper analyses the causes and effects of GAS Compressor Platform that support material is not return, using Fault Tree Analysis (FTA) and Event Tree Analysis (ETA). From fault tree analysis, the probability of top event is 0.7783. From event tree analysis diagram, the contractors lose Rp.350.000.000, - to Rp.10.000.000.000, -.
9th Annual CMMI Technology Conference and User Group-Tuesday
2009-11-19
evaluating and quantifying risk likelihood and severity risks. Step 4 Project defines thresholds for each risk category. Step 5 Project defines bounds on the...defines consistent criteria for evaluating and quantifying risk likelihood and severity risks in the Risk Management Plan. Step 4 Project defines
2010-01-01
Background People with diabetes can suffer from diverse complications that seriously erode quality of life. Diabetes, costing the United States more than $174 billion per year in 2007, is expected to take an increasingly large financial toll in subsequent years. Accurate projections of diabetes burden are essential to policymakers planning for future health care needs and costs. Methods Using data on prediabetes and diabetes prevalence in the United States, forecasted incidence, and current US Census projections of mortality and migration, the authors constructed a series of dynamic models employing systems of difference equations to project the future burden of diabetes among US adults. A three-state model partitions the US population into no diabetes, undiagnosed diabetes, and diagnosed diabetes. A four-state model divides the state of "no diabetes" into high-risk (prediabetes) and low-risk (normal glucose) states. A five-state model incorporates an intervention designed to prevent or delay diabetes in adults at high risk. Results The authors project that annual diagnosed diabetes incidence (new cases) will increase from about 8 cases per 1,000 in 2008 to about 15 in 2050. Assuming low incidence and relatively high diabetes mortality, total diabetes prevalence (diagnosed and undiagnosed cases) is projected to increase from 14% in 2010 to 21% of the US adult population by 2050. However, if recent increases in diabetes incidence continue and diabetes mortality is relatively low, prevalence will increase to 33% by 2050. A middle-ground scenario projects a prevalence of 25% to 28% by 2050. Intervention can reduce, but not eliminate, increases in diabetes prevalence. Conclusions These projected increases are largely attributable to the aging of the US population, increasing numbers of members of higher-risk minority groups in the population, and people with diabetes living longer. Effective strategies will need to be undertaken to moderate the impact of these factors on national diabetes burden. Our analysis suggests that widespread implementation of reasonably effective preventive interventions focused on high-risk subgroups of the population can considerably reduce, but not eliminate, future increases in diabetes prevalence. PMID:20969750
Ergonomic assessment for the task of repairing computers in a manufacturing company: A case study.
Maldonado-Macías, Aidé; Realyvásquez, Arturo; Hernández, Juan Luis; García-Alcaraz, Jorge
2015-01-01
Manufacturing industry workers who repair computers may be exposed to ergonomic risk factors. This project analyzes the tasks involved in the computer repair process to (1) find the risk level for musculoskeletal disorders (MSDs) and (2) propose ergonomic interventions to address any ergonomic issues. Work procedures and main body postures were video recorded and analyzed using task analysis, the Rapid Entire Body Assessment (REBA) postural method, and biomechanical analysis. High risk for MSDs was found on every subtask using REBA. Although biomechanical analysis found an acceptable mass center displacement during tasks, a hazardous level of compression on the lower back during computer's transportation was detected. This assessment found ergonomic risks mainly in the trunk, arm/forearm, and legs; the neck and hand/wrist were also compromised. Opportunities for ergonomic analyses and interventions in the design and execution of computer repair tasks are discussed.
The SAMCO Web-platform for resilience assessment in mountainous valleys impacted by landslide risks.
NASA Astrophysics Data System (ADS)
Grandjean, Gilles; Thomas, Loic; Bernardie, Severine
2016-04-01
The ANR-SAMCO project aims to develop a proactive resilience framework enhancing the overall resilience of societies on the impacts of mountain risks. The project aims to elaborate methodological tools to characterize and measure ecosystem and societal resilience from an operative perspective on three mountain representative case studies. To achieve this objective, the methodology is split in several points: (1) the definition of the potential impacts of global environmental changes (climate system, ecosystem e.g. land use, socio-economic system) on landslide hazards, (2) the analysis of these consequences in terms of vulnerability (e.g. changes in the location and characteristics of the impacted areas and level of their perturbation) and (3) the implementation of a methodology for quantitatively investigating and mapping indicators of mountain slope vulnerability exposed to several hazard types, and the development of a GIS-based demonstration platform available on the web. The strength and originality of the SAMCO project lies in the combination of different techniques, methodologies and models (multi-hazard assessment, risk evolution in time, vulnerability functional analysis, and governance strategies) that are implemented in a user-oriented web-platform, currently in development. We present the first results of this development task, architecture and functions of the web-tools, the case studies database showing the multi-hazard maps and the stakes at risks. Risk assessment over several area of interest in Alpine or Pyrenean valleys are still in progress, but the first analyses are presented for current and future periods for which climate change and land-use (economical, geographical and social aspects) scenarios are taken into account. This tool, dedicated to stakeholders, should be finally used to evaluate resilience of mountainous regions since multiple scenarios can be tested and compared.
A Stochastic Multi-Attribute Assessment of Energy Options for Fairbanks, Alaska
NASA Astrophysics Data System (ADS)
Read, L.; Madani, K.; Mokhtari, S.; Hanks, C. L.; Sheets, B.
2012-12-01
Many competing projects have been proposed to address Interior Alaska's high cost of energy—both for electricity production and for heating. Public and private stakeholders are considering the costs associated with these competing projects which vary in fuel source, subsidy requirements, proximity, and other factors. As a result, the current projects under consideration involve a complex cost structure of potential subsidies and reliance on present and future market prices, introducing a significant amount of uncertainty associated with each selection. Multi-criteria multi-decision making (MCMDM) problems of this nature can benefit from game theory and systems engineering methods, which account for behavior and preferences of stakeholders in the analysis to produce feasible and relevant solutions. This work uses a stochastic MCMDM framework to evaluate the trade-offs of each proposed project based on a complete cost analysis, environmental impact, and long-term sustainability. Uncertainty in the model is quantified via a Monte Carlo analysis, which helps characterize the sensitivity and risk associated with each project. Based on performance measures and criteria outlined by the stakeholders, a decision matrix will inform policy on selecting a project that is both efficient and preferred by the constituents.
Driver distraction : eye glance analysis and conversation workload : [research brief].
DOT National Transportation Integrated Search
2015-11-01
The objective of this project was to: : Assess the risk of performing a secondary task : while driving a commercial motor vehicle (CMV). : Better understand the relationship of conversation : workload and visual distraction during mobile : ph...
32 CFR 701.117 - Changes to PA systems of records.
Code of Federal Regulations, 2010 CFR
2010-07-01
... wishing to create a new PA system of records must conduct a risk analysis of the proposed system to consider the sensitivity and use of the records; present and projected threats and vulnerabilities; and...
Statewide analysis of bicycle crashes : [project summary].
DOT National Transportation Integrated Search
2017-06-01
An extensive literature review was conducted to locate existing studies in four areas: (1) risk factors that affect the frequency and severity of bicycle crashes; (2) bicycle crash causes, patterns, and contributing factors; (3) network screening met...
NASA Technical Reports Server (NTRS)
2002-01-01
Under a Phase II SBIR contract, Kennedy and Lumina Decision Systems, Inc., jointly developed the Schedule and Cost Risk Analysis Modeling (SCRAM) system, based on a version of Lumina's flagship software product, Analytica(R). Acclaimed as "the best single decision-analysis program yet produced" by MacWorld magazine, Analytica is a "visual" tool used in decision-making environments worldwide to build, revise, and present business models, minus the time-consuming difficulty commonly associated with spreadsheets. With Analytica as their platform, Kennedy and Lumina created the SCRAM system in response to NASA's need to identify the importance of major delays in Shuttle ground processing, a critical function in project management and process improvement. As part of the SCRAM development project, Lumina designed a version of Analytica called the Analytica Design Engine (ADE) that can be easily incorporated into larger software systems. ADE was commercialized and utilized in many other developments, including web-based decision support.
NASA Astrophysics Data System (ADS)
Eggl, Siegfried
2014-05-01
Mankind believes to have the capabilities to avert potentially disastrous asteroid impacts. Yet, only the realization of a mitigation demonstration mission can confirm such a claim. The NEOShield project, an international collaboration under European leadership, aims to draw a comprehensive picture of the scientific as well as technical requirements to such an endeavor. One of the top priorities of such a demonstration mission is, of course, that a previously harmless target asteroid shall not be turned into a potentially hazardous object. Given the inherently large uncertainties in an asteroid's physical parameters, as well as the additional uncertainties introduced during the deflection attempt, an in depth analysis of the change in asteroid impact probabilities after a deflection event becomes necessary. We present a post mitigation impact risk analysis of a list of potential deflection test missions and discuss the influence of orbital, physical and mitigation induced uncertainties.
NASA Technical Reports Server (NTRS)
Maluf, David A. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor); Gawdiak, Yuri O. (Inventor)
2009-01-01
A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.
NASA Astrophysics Data System (ADS)
Tufekci, Duygu; Lutfi Suzen, Mehmet; Cevdet Yalciner, Ahmet
2017-04-01
The resilience of coastal communities against tsunamis are dependent on preparedness of the communities. Preparedness covers social and structural components which increases with the awareness in the community against tsunamis. Therefore, proper evaluation of all components of preparedness will help communities to reduce the adverse effects of tsunamis and increase the overall resilience of communities. On the other hand, the complexity of the metropolitan life with its social and structural components necessitates explicit vulnerability assessments for proper determination of tsunami risk, and development of proper mitigation strategies and recovery plans. Assessing the vulnerability and resilience level of a region against tsunamis and efforts for reducing the tsunami risk are the key components of disaster management. Since increasing the awareness of coastal communities against tsunamis is one of the main objectives of disaster management, then it should be considered as one of the parameter in tsunami risk analysis. In the method named MetHuVA (METU - Metropolitan Human Tsunami Vulnerability Assessment) proposed by Cankaya et al., (2016) and Tufekci et al., (2016), the awareness and preparedness level of the community is revealed to be an indispensable parameter with a great effect on tsunami risk. According to the results obtained from those studies, it becomes important that the awareness and preparedness parameter (n) must be analyzed by considering their interaction and all related components. While increasing awareness can be achieved, vulnerability and risk will be reduced. In this study the components of awareness and preparedness parameter (n) is analyzed in different categories by considering administrative, social, educational, economic and structural preparedness of the coastal communities. Hence the proposed awareness and preparedness parameter can properly be analyzed and further improvements can be achieved in vulnerability and risk analysis. Furthermore, the components of the awareness and preparedness parameter n, is widely investigated in global and local practices by using the method of categorization to determine different levels for different coastal metropolitan areas with different cultures and with different hazard perception. Moreover, consistency between the theoretical maximum and practical applications of parameter n is estimated, discussed and presented. In the applications mainly the Bakirkoy district of Istanbul is analyzed and the results are presented. Acknowledgements: Partial support by 603839 ASTARTE Project of EU, UDAPC-12-14 project of AFAD, Turkey, 213M534 projects of TUBITAK, Japan-Turkey Joint Research Project by JICA on earthquakes and tsunamis in Marmara Region in (JICA SATREPS - MarDiM Project), and Istanbul Metropolitan Municipality are acknowledged.
Multi-hazard risk analysis using the FP7 RASOR Platform
NASA Astrophysics Data System (ADS)
Koudogbo, Fifamè N.; Duro, Javier; Rossi, Lauro; Rudari, Roberto; Eddy, Andrew
2014-10-01
Climate change challenges our understanding of risk by modifying hazards and their interactions. Sudden increases in population and rapid urbanization are changing exposure to risk around the globe, making impacts harder to predict. Despite the availability of operational mapping products, there is no single tool to integrate diverse data and products across hazards, update exposure data quickly and make scenario-based predictions to support both short and long-term risk-related decisions. RASOR (Rapid Analysis and Spatialization Of Risk) will develop a platform to perform multi-hazard risk analysis for the full cycle of disaster management, including targeted support to critical infrastructure monitoring and climate change impact assessment. A scenario-driven query system simulates future scenarios based on existing or assumed conditions and compares them with historical scenarios. RASOR will thus offer a single work environment that generates new risk information across hazards, across data types (satellite EO, in-situ), across user communities (global, local, climate, civil protection, insurance, etc.) and across the world. Five case study areas are considered within the project, located in Haiti, Indonesia, Netherlands, Italy and Greece. Initially available over those demonstration areas, RASOR will ultimately offer global services to support in-depth risk assessment and full-cycle risk management.
A new model for care population management.
Williams, Jeni
2013-03-01
Steps toward building a population management model of care should include: Identifying the population that would be cared for through a population management initiative. Conducting an actuarial analysis for this population, reviewing historical utilization and cost data and projecting changes in utilization. Investing in data infrastructure that supports the exchange of data among providers and with payers. Determining potential exposure to downside risk and organizational capacity to assume this risk. Experimenting with payment models and care delivery approaches Hiring care coordinators to manage care for high-risk patients.
Integrated Hybrid System Architecture for Risk Analysis
NASA Technical Reports Server (NTRS)
Moynihan, Gary P.; Fonseca, Daniel J.; Ray, Paul S.
2010-01-01
A conceptual design has been announced of an expert-system computer program, and the development of a prototype of the program, intended for use as a project-management tool. The program integrates schedule and risk data for the purpose of determining the schedule applications of safety risks and, somewhat conversely, the effects of changes in schedules on changes on safety. It is noted that the design has been delivered to a NASA client and that it is planned to disclose the design in a conference presentation.
Enhanced Capabilities for Subcritical Experiments (ECSE) Risk Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Urban, Mary Elizabeth
Risk is a factor, element, constraint, or course of action that introduces an uncertainty of outcome that could impact project objectives. Risk is an inherent part of all activities, whether the activity is simple and small, or large and complex. Risk management is a process that identifies, evaluates, handles, and monitors risks that have the potential to affect project success. The risk management process spans the entire project, from its initiation to its successful completion and closeout, including both technical and programmatic (non-technical) risks. This Risk Management Plan (RMP) defines the process to be used for identifying, evaluating, handling, andmore » monitoring risks as part of the overall management of the Enhanced Capabilities for Subcritical Experiments (ECSE) ‘Project’. Given the changing nature of the project environment, risk management is essentially an ongoing and iterative process, which applies the best efforts of a knowledgeable project staff to a suite of focused and prioritized concerns. The risk management process itself must be continually applied throughout the project life cycle. This document was prepared in accordance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, its associated guide for risk management DOE G 413.3-7, Risk Management Guide, and LANL ADPM AP-350-204, Risk and Opportunity Management.« less
Cleveland Clinic Rehabilitation Research Program
2014-10-01
risks have been identified that would require a new risk analysis. The study is now registered as a pilot clinical trial. Use of tDCS , TMS and structural...using behavioral recording and electroencephalographic ( EEG ) recording and results were published. Study 2: The motor cortex (M1) and the...four pilot projects. Study 1: Magnetic stimulation and epilepsy In this study, transcranial magnetic stimulation ( TMS ) will be tested for its
Garland, Rebecca M.; Matooane, Mamopeli; Engelbrecht, Francois A.; Bopape, Mary-Jane M.; Landman, Willem A.; Naidoo, Mogesh; van der Merwe, Jacobus; Wright, Caradee Y.
2015-01-01
Regional climate modelling was used to produce high resolution climate projections for Africa, under a “business as usual scenario”, that were translated into potential health impacts utilizing a heat index that relates apparent temperature to health impacts. The continent is projected to see increases in the number of days when health may be adversely affected by increasing maximum apparent temperatures (AT) due to climate change. Additionally, climate projections indicate that the increases in AT results in a moving of days from the less severe to the more severe Symptom Bands. The analysis of the rate of increasing temperatures assisted in identifying areas, such as the East African highlands, where health may be at increasing risk due to both large increases in the absolute number of hot days, and due to the high rate of increase. The projections described here can be used by health stakeholders in Africa to assist in the development of appropriate public health interventions to mitigate the potential health impacts from climate change. PMID:26473895
Risk Quantification of Systems Engineering Documents Improves Probability of DOD Project Success
2009-09-01
comprehensive risk model for DoD milestone review documentation as well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project...Milestone Documentation, Project Planning, Rational Frame, Political Frame, CMMI Project Planning Process Area, CMMI Risk Management Process Area...well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project Planning and Risk Management process areas. The intent is to
The American Climate Prospectus: a risk-centered analysis of the economic impacts of climate change
NASA Astrophysics Data System (ADS)
Jina, A.; Houser, T.; Hsiang, S. M.; Kopp, R. E., III; Delgado, M.; Larsen, K.; Mohan, S.; Rasmussen, D.; Rising, J.; Wilson, P. S.; Muir-Wood, R.
2014-12-01
The American Climate Prospectus (ACP), the analysis underlying the Risky Business project, quantitatively assessed the climate risks posed to the United States' economy in six sectors - crop yields, energy demand, coastal property, crime, labor productivity, and mortality [1]. The ACP is unique in its characterization of the full probability distribution of economic impacts of climate change throughout the 21st century, making it an extremely useful basis for risk assessments. Three key innovations allow for this characterization. First, climate projections from CMIP5 models are scaled to a temperature probability distribution derived from a coarser climate model (MAGICC). This allows a more accurate representation of the whole distribution of future climates (in particular the tails) than a simple ensemble average. These are downscaled both temporally and spatially. Second, a set of local sea level rise and tropical cyclone projections are used in conjunction with the most detailed dataset of coastal property in the US in order to capture the risks of rising seas and storm surge. Third, we base many of our sectors on empirically-derived responses to temperature and precipitation. Each of these dose-response functions is resampled many times to populate a statistical distribution. Combining these with uncertainty in emissions scenario, climate model, and weather, we create the full probability distribution of climate impacts from county up to national levels, as well as model the effects upon the economy as a whole. Results are presented as likelihood ranges, as well as changes to return intervals of extreme events. The ACP analysis allows us to compare between sectors to understand the magnitude of required policy responses, and also to identify risks through time. Many sectors displaying large impacts at the end of the century, like those of mortality, have smaller changes in the near-term, due to non-linearities in the response functions. Other sectors, like coastal damages, have monotonically increasing costs throughout the 21st century. Taken together, the results from the ACP presents a unique and novel view of the short-, medium-, and long-term economic risks of climate change in the US. References: [1] T. Houser et al (2014), American Climate Prospectus, www.climateprospectus.org.
The economic impact of project MARS (motivating adolescents to reduce sexual risk).
Dealy, Bern C; Horn, Brady P; Callahan, Tiffany J; Bryan, Angela D
2013-09-01
The purpose of this study was to economically evaluate Project MARS (Motivating Adolescents to Reduce Sexual Risk; T. J. Callahan, E. A. Montanaro, R. E. Magnan, & A. D. Bryan, 2013, "Project MARS: Design of a multi-behavior intervention trial for justice-involved youth," Translational Behavioral Medicine, Vol. 3, pp. 122-130), an ongoing, randomized, sexual-risk-reduction intervention for justice-involved youth. We consider the effect of including viral STIs in the economic analysis, and explore the impact of the MARS intervention on the perceived cost of acquiring STIs to justice-involved youth. 206 participants, ages 14 to 18, participated in a sexual-risk-reduction intervention that included screening and treatment for chlamydia and gonorrhea. A Bernoulli probability model was used to estimate averted STIs attributable to the MARS intervention. The economic benefit of averted STIs was monetized using the direct medical cost of treatment. In addition, we used a contingent valuation (willingness-to-pay) model to investigate the impact of the Project MARS on participants' perceived cost of acquiring an STI. Using the standard outcome domains typically used to evaluate STI interventions, Project MARS resulted in a reduction of $2.08 in direct medical costs for every $1 spent. When viral STIs were added to the economic model, a considerable increase in averted direct medical costs ($2.68 for every $1 spent) was found. Preliminary contingent valuation estimates suggest that participants' willingness-to-pay for averted STIs significantly increased after receiving the MARS intervention. From an economic perspective, Project MARS is a worthwhile program to adopt. Future attention should be given to the impact of behavioral interventions on viral infections. PsycINFO Database Record (c) 2013 APA, all rights reserved.
NASA Astrophysics Data System (ADS)
Escuder-Bueno, I.; Castillo-Rodríguez, J. T.; Zechner, S.; Jöbstl, C.; Perales-Momparler, S.; Petaccia, G.
2012-09-01
Risk analysis has become a top priority for authorities and stakeholders in many European countries, with the aim of reducing flooding risk, considering the population's needs and improving risk awareness. Within this context, two methodological pieces have been developed in the period 2009-2011 within the SUFRI project (Sustainable Strategies of Urban Flood Risk Management with non-structural measures to cope with the residual risk, 2nd ERA-Net CRUE Funding Initiative). First, the "SUFRI Methodology for pluvial and river flooding risk assessment in urban areas to inform decision-making" provides a comprehensive and quantitative tool for flood risk analysis. Second, the "Methodology for investigation of risk awareness of the population concerned" presents the basis to estimate current risk from a social perspective and identify tendencies in the way floods are understood by citizens. Outcomes of both methods are integrated in this paper with the aim of informing decision making on non-structural protection measures. The results of two case studies are shown to illustrate practical applications of this developed approach. The main advantage of applying the methodology herein presented consists in providing a quantitative estimation of flooding risk before and after investing in non-structural risk mitigation measures. It can be of great interest for decision makers as it provides rational and solid information.
A multi-model analysis of risk of ecosystem shifts under climate change
NASA Astrophysics Data System (ADS)
Warszawski, Lila; Friend, Andrew; Ostberg, Sebastian; Frieler, Katja; Lucht, Wolfgang; Schaphoff, Sibyll; Beerling, David; Cadule, Patricia; Ciais, Philippe; Clark, Douglas B.; Kahana, Ron; Ito, Akihiko; Keribin, Rozenn; Kleidon, Axel; Lomas, Mark; Nishina, Kazuya; Pavlick, Ryan; Tito Rademacher, Tim; Buechner, Matthias; Piontek, Franziska; Schewe, Jacob; Serdeczny, Olivia; Schellnhuber, Hans Joachim
2013-12-01
Climate change may pose a high risk of change to Earth’s ecosystems: shifting climatic boundaries may induce changes in the biogeochemical functioning and structures of ecosystems that render it difficult for endemic plant and animal species to survive in their current habitats. Here we aggregate changes in the biogeochemical ecosystem state as a proxy for the risk of these shifts at different levels of global warming. Estimates are based on simulations from seven global vegetation models (GVMs) driven by future climate scenarios, allowing for a quantification of the related uncertainties. 5-19% of the naturally vegetated land surface is projected to be at risk of severe ecosystem change at 2 ° C of global warming (ΔGMT) above 1980-2010 levels. However, there is limited agreement across the models about which geographical regions face the highest risk of change. The extent of regions at risk of severe ecosystem change is projected to rise with ΔGMT, approximately doubling between ΔGMT = 2 and 3 ° C, and reaching a median value of 35% of the naturally vegetated land surface for ΔGMT = 4 °C. The regions projected to face the highest risk of severe ecosystem changes above ΔGMT = 4 °C or earlier include the tundra and shrublands of the Tibetan Plateau, grasslands of eastern India, the boreal forests of northern Canada and Russia, the savanna region in the Horn of Africa, and the Amazon rainforest.
Assessing the risk persistent drought using climate model simulations and paleoclimate data
Ault, Toby R.; Cole, Julia E.; Overpeck, Jonathan T.; Pederson, Gregory T.; Meko, David M.
2014-01-01
Projected changes in global rainfall patterns will likely alter water supplies and ecosystems in semiarid regions during the coming century. Instrumental and paleoclimate data indicate that natural hydroclimate fluctuations tend to be more energetic at low (multidecadal to multicentury) than at high (interannual) frequencies. State-of-the-art global climate models do not capture this characteristic of hydroclimate variability, suggesting that the models underestimate the risk of future persistent droughts. Methods are developed here for assessing the risk of such events in the coming century using climate model projections as well as observational (paleoclimate) information. Where instrumental and paleoclimate data are reliable, these methods may provide a more complete view of prolonged drought risk. In the U.S. Southwest, for instance, state-of-the-art climate model projections suggest the risk of a decade-scale megadrought in the coming century is less than 50%; the analysis herein suggests that the risk is at least 80%, and may be higher than 90% in certain areas. The likelihood of longer-lived events (>35 yr) is between 20% and 50%, and the risk of an unprecedented 50-yr megadrought is nonnegligible under the most severe warming scenario (5%–10%). These findings are important to consider as adaptation and mitigation strategies are developed to cope with regional impacts of climate change, where population growth is high and multidecadal megadrought—worse than anything seen during the last 2000 years—would pose unprecedented challenges to water resources in the region.
NASA Astrophysics Data System (ADS)
Spizzichino, D.; Campobasso, C.; Gallozzi, P. L.; Dessi', B.; Traversa, F.
2009-04-01
ReNDiS project is a useful tool for monitoring, analysis and management of information data on mitigation measures and restoration works of soil protection at national scale. The main scope of the project, and related monitoring activities, is to improve the knowledge about the use of national funds and efforts against floods and landslides risk and, as a consequence, to better address the preventive policies in future. Since 1999 after the disastrous mudflow event occurred in Sarno in 1998, which caused the loss of 160 human lives, an extraordinary effort was conducted by the Italian Government in order to promote preventive measures against the hydro geological risk over the entire Italian territory. The Italian Ministry for the Environment promoted several and annual soil protection programmes. The ReNDiS project (Repertory of mitigation measures for National Soil Protection) is carried out by ISPRA - Institute for Environmental protection and Research, with the aim of improving the knowledge about the results of preventive policies against floods and landslides in order to better address national funds as requested by the Minister itself. The repertory is composed by a main archive and two secondary interface, the first for direct data management (ReNDiS-ist) and the latter (ReNDiS-web) for the on-line access and public consultation. At present, ReNDiS database contains about 3000 records concerning those programmes, focused on restoration works but including also information on landslide typologies and processes. The monitoring project is developed taking into account all the information about each step of every mitigation measure from the initial funding phase until the end of the work. During present work, we have statistically analyzed the ReNDiS database in order to highlight the conformity between the characteristic and type of the hazard (identified in a specific area) and the corresponding mitigation measures adopted for risk reduction. Through specific queries, we have grouped engineering works in several categories that have been related to the characteristics and type of hazards Vs cost-benefit analysis and timing of each work. Implementing a statistical analysis of the ReNDiS database, it has been possible to attempt a first spatial and temporal comparison between zoning of risk and distribution of preventive measures with relative cost at national level. In synthesis, this study has shown that although the total amount of resources devoted to preventive measures are not enough to remove the risk over the entire territory, the response of Italian institutions is in general well calibrated on the characteristic and type of hazard, but still very complex. Further efforts are necessary in order to improve the knowledge on landslides and flood prone areas, also in the perspective of adaptation to climate changes and to better address the public investments where the hydro geological risk is more critical. The importance of this monitoring activities is mainly due to limited financial resources of the Italian public sector in soil protection. Data collection, monitoring activities and statistical analysis like the ones carried out in ReNDiS experience is one of the best way in order to optimise the allocation of financial resources for the mitigation of natural hazard and risk.
Cancer Risk Assessment in Welder's Under Different Exposure Scenarios.
Barkhordari, Abolfazl; Zare Sakhvidi, Mohammad Javad; Zare Sakhvidi, Fariba; Halvani, Gholamhossein; Firoozichahak, Ali; Shirali, GholamAbbas
2014-05-01
Welders exposure to nickel and hexavalent chromium in welding fumes is associated with increase of cancer risk in welders. In this study we calculated cancer risk due to exposure to these compounds in welders. The role of exposure parameters in welders on derived incremental lifetime cancer risk were determined by stochastic modeling of cancer risk. Input parameters were determined by field investigation in Iranian welders in 2013 and literature review. The 90% upper band cancer risk due to hexavalent chromium and nickel exposure was in the range of 6.03E-03 to 2.12E-02 and 7.18E-03 to 2.61E-02 respectively. Scenario analysis showed that asthmatic and project welders are significantly at higher cancer risk in comparison with other welders (P<0.05). Shift duration was responsible for 37% and 33% of variances for hexavalent chromium and nickel respectively. Welders are at high and unacceptable risk of cancer. Control measures according to scenario analysis findings are advisable.
Risk Management in Biologics Technology Transfer.
Toso, Robert; Tsang, Jonathan; Xie, Jasmina; Hohwald, Stephen; Bain, David; Willison-Parry, Derek
Technology transfer of biological products is a complex process that is important for product commercialization. To achieve a successful technology transfer, the risks that arise from changes throughout the project must be managed. Iterative risk analysis and mitigation tools can be used to both evaluate and reduce risk. The technology transfer stage gate model is used as an example tool to help manage risks derived from both designed process change and unplanned changes that arise due to unforeseen circumstances. The strategy of risk assessment for a change can be tailored to the type of change. In addition, a cross-functional team and centralized documentation helps maximize risk management efficiency to achieve a successful technology transfer. © PDA, Inc. 2016.
Improved FTA methodology and application to subsea pipeline reliability design.
Lin, Jing; Yuan, Yongbo; Zhang, Mingyuan
2014-01-01
An innovative logic tree, Failure Expansion Tree (FET), is proposed in this paper, which improves on traditional Fault Tree Analysis (FTA). It describes a different thinking approach for risk factor identification and reliability risk assessment. By providing a more comprehensive and objective methodology, the rather subjective nature of FTA node discovery is significantly reduced and the resulting mathematical calculations for quantitative analysis are greatly simplified. Applied to the Useful Life phase of a subsea pipeline engineering project, the approach provides a more structured analysis by constructing a tree following the laws of physics and geometry. Resulting improvements are summarized in comparison table form.
Improved FTA Methodology and Application to Subsea Pipeline Reliability Design
Lin, Jing; Yuan, Yongbo; Zhang, Mingyuan
2014-01-01
An innovative logic tree, Failure Expansion Tree (FET), is proposed in this paper, which improves on traditional Fault Tree Analysis (FTA). It describes a different thinking approach for risk factor identification and reliability risk assessment. By providing a more comprehensive and objective methodology, the rather subjective nature of FTA node discovery is significantly reduced and the resulting mathematical calculations for quantitative analysis are greatly simplified. Applied to the Useful Life phase of a subsea pipeline engineering project, the approach provides a more structured analysis by constructing a tree following the laws of physics and geometry. Resulting improvements are summarized in comparison table form. PMID:24667681
Correlational Study of Risk Management and Information Technology Project Success
ERIC Educational Resources Information Center
Gillespie, Seth J.
2014-01-01
Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…
Truong, Chi; Trück, Stefan
2017-04-01
Data on certainty equivalent discount factors and discount rates for stochastic interest rates in Australia are provided in this paper. The data has been used for the analysis of investments into climate adaptation projects in ׳It׳s not now or never: Implications of investment timing and risk aversion on climate adaptation to extreme events ׳ (Truong and Trück, 2016) [3] and can be used for other cost-benefit analysis studies in Australia. The data is of particular interest for the discounting of projects that create monetary costs and benefits in the distant future.
Understanding Pre-Quantitative Risk in Projects
NASA Technical Reports Server (NTRS)
Cooper, Lynne P.
2011-01-01
Standard approaches to risk management in projects depend on the ability of teams to identify risks and quantify the probabilities and consequences of these risks (e.g., the 5 x 5 risk matrix). However, long before quantification does - or even can - occur, and long after, teams make decisions based on their pre-quantitative understanding of risk. These decisions can have long-lasting impacts on the project. While significant research has looked at the process of how to quantify risk, our understanding of how teams conceive of and manage pre-quantitative risk is lacking. This paper introduces the concept of pre-quantitative risk and discusses the implications of addressing pre-quantitative risk in projects.
NASA Astrophysics Data System (ADS)
Poux, Adeline; Wendel, Marco; Jaudin, Florence; Hiegl, Mathias
2010-05-01
Numerous advantages of geothermal energy like its widespread distribution, a base-load power and availability higher than 90%, a small footprint and low carbon emissions, and the growing concerns about climate changes strongly promote the development of geothermal projects. Geothermal energy as a local energy source implies needs on surface to be located close to the geothermal resource. Many European regions dispose of a good geothermal potential but it is mostly not sufficiently developed due to non-technical barriers occurring at the very early stages of the project. The GEOFAR Project carried out within the framework of EU's "Intelligent Energy Europe" (IEE) program, gathers a consortium of European partners from Germany, France, Greece, Spain and Portugal. Launched in September 2008, the aim of this research project is to analyze the mentioned non-technical barriers, focusing most particularly on economic and financial aspects. Based on this analysis GEOFAR aims at developing new financial and administrative schemes to overcome the main financial barriers for deep geothermal projects (for electricity and direct use, without heat pumps). The analysis of the current situation and the future development of geothermal energy in GEOFAR target countries (Germany, France, Greece, Spain, Portugal, Slovakia, Bulgaria and Hungary) was necessary to understand and expose the diverging status of the geothermal sector and the more and less complicated situation for geothermal projects in different Europeans Regions. A deeper analysis of 40 cases studies (operating, planned and failed projects) of deep geothermal projects also contributed to this detailed view. An exhaustive analysis and description of financial mechanisms already existing in different European countries and at European level to support investors completed the research on non-technical barriers. Based on this profound analysis, the GEOFAR project has made an overview of the difficulties met by project planners, developers and politicians when developing a new geothermal project. Each of the analyzed countries is facing a distinct bundle of non-technical barriers. Globally, deep geothermal projects are characterized by high up-front costs and are facing the geological risk of the non discovery of the resources in adequacy to the initial expectations. Moreover, investors are facing directly the competitiveness of fossils energy. The very long pay back period makes it also difficult for them to face the geological risk. GEOFAR will propose new targeting financing and funding schemes, in order to remove the financial barriers hindering the initial stages of geothermal energy projects. GEOFAR also considers a lack of awareness as important barrier hindering the future development of geothermal energy projects. Public opinion is globally positive to geothermal energy, but deep geothermal projects are often suffering from a lack of information leading sometimes to non public acceptance. By underlining the range of possibilities offered by the geothermal energy and the potential and emerging technologies, GEOFAR tends to increase the awareness of geothermal energy in order to boost the development and the investment in new geothermal energy projects. Geothermal energy is expected to contribute significantly to the future European energy sources and the GEOFAR project aims to facilitate it.
Putting the environment into the NPV calculation -- Quantifying pipeline environmental costs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dott, D.R.; Wirasinghe, S.C.; Chakma, A.
1996-12-31
Pipeline projects impact the environment through soil and habitat disturbance, noise during construction and compressor operation, river crossing disturbance and the risk of rupture. Assigning monetary value to these negative project consequences enables the environment to be represented in the project cost-benefit analysis. This paper presents the mechanics and implications of two environmental valuation techniques: (1) the contingent valuation method and (2) the stated preference method. The use of environmental value at the project economic-evaluation stage is explained. A summary of research done on relevant environmental attribute valuation is presented and discussed. Recommendations for further research in the field aremore » made.« less
Biophysical risks to carbon sequestration and storage in Australian drylands.
Nolan, Rachael H; Sinclair, Jennifer; Eldridge, David J; Ramp, Daniel
2018-02-15
Carbon abatement schemes that reduce land clearing and promote revegetation are now an important component of climate change policy globally. There is considerable potential for these schemes to operate in drylands which are spatially extensive. However, projects in these environments risk failure through unplanned release of stored carbon to the atmosphere. In this review, we identify factors that may adversely affect the success of vegetation-based carbon abatement projects in dryland ecosystems, evaluate their likelihood of occurrence, and estimate the potential consequences for carbon storage and sequestration. We also evaluate management strategies to reduce risks posed to these carbon abatement projects. Identified risks were primarily disturbances, including unplanned fire, drought, and grazing. Revegetation projects also risk recruitment failure, thereby failing to reach projected rates of sequestration. Many of these risks are dependent on rainfall, which is highly variable in drylands and susceptible to further variation under climate change. Resprouting vegetation is likely to be less vulnerable to disturbance and have faster recovery rates upon release from disturbance. We conclude that there is a strong impetus for identifying management strategies and risk reduction mechanisms for carbon abatement projects. Risk mitigation would be enhanced by effective co-ordination of mitigation strategies at scales larger than individual abatement project boundaries, and by implementing risk assessment throughout project planning and implementation stages. Reduction of risk is vital for maximising carbon sequestration of individual projects and for reducing barriers to the establishment of new projects entering the market. Copyright © 2017 Elsevier Ltd. All rights reserved.
Assurance of Fault Management: Risk-Significant Adverse Condition Awareness
NASA Technical Reports Server (NTRS)
Fitz, Rhonda
2016-01-01
Fault Management (FM) systems are ranked high in risk-based assessment of criticality within flight software, emphasizing the importance of establishing highly competent domain expertise to provide assurance for NASA projects, especially as spaceflight systems continue to increase in complexity. Insight into specific characteristics of FM architectures seen embedded within safety- and mission-critical software systems analyzed by the NASA Independent Verification Validation (IVV) Program has been enhanced with an FM Technical Reference (TR) suite. Benefits are aimed beyond the IVV community to those that seek ways to efficiently and effectively provide software assurance to reduce the FM risk posture of NASA and other space missions. The identification of particular FM architectures, visibility, and associated IVV techniques provides a TR suite that enables greater assurance that critical software systems will adequately protect against faults and respond to adverse conditions. The role FM has with regard to overall asset protection of flight software systems is being addressed with the development of an adverse condition (AC) database encompassing flight software vulnerabilities.Identification of potential off-nominal conditions and analysis to determine how a system responds to these conditions are important aspects of hazard analysis and fault management. Understanding what ACs the mission may face, and ensuring they are prevented or addressed is the responsibility of the assurance team, which necessarily should have insight into ACs beyond those defined by the project itself. Research efforts sponsored by NASAs Office of Safety and Mission Assurance defined terminology, categorized data fields, and designed a baseline repository that centralizes and compiles a comprehensive listing of ACs and correlated data relevant across many NASA missions. This prototype tool helps projects improve analysis by tracking ACs, and allowing queries based on project, mission type, domain component, causal fault, and other key characteristics. The repository has a firm structure, initial collection of data, and an interface established for informational queries, with plans for integration within the Enterprise Architecture at NASA IVV, enabling support and accessibility across the Agency. The development of an improved workflow process for adaptive, risk-informed FM assurance is currently underway.
Exploration Laboratory Analysis
NASA Technical Reports Server (NTRS)
Krihak, M.; Ronzano, K.; Shaw, T.
2016-01-01
The Exploration Laboratory Analysis (ELA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the availability of inflight laboratory analysis instrumentation has been identified as an essential capability for manned exploration missions. Since a single, compact space-ready laboratory analysis capability to perform all exploration clinical measurements is not commercially available, the ELA project objective is to demonstrate the feasibility of emerging operational and analytical capability as a biomedical diagnostics precursor to long duration manned exploration missions. The initial step towards ground and flight demonstrations in fiscal year (FY) 2015 was the down selection of platform technologies for demonstrations in the space environment. The technologies selected included two Small Business Innovation Research (SBIR) performers: DNA Medicine Institutes rHEALTH X and Intelligent Optical Systems later flow assays combined with Holomics smartphone analyzer. The selection of these technologies were based on their compact size, breadth of analytical capability and favorable ability to process fluids in a space environment, among several factors. These two technologies will be advanced to meet ground and flight demonstration success criteria and requirements that will be finalized in FY16. Also, the down selected performers will continue the technology development phase towards meeting prototype deliverables in either late 2016 or 2017.
Exploration Laboratory Analysis
NASA Technical Reports Server (NTRS)
Krihak, M.; Ronzano, K.; Shaw, T.
2016-01-01
The Exploration Laboratory Analysis (ELA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the availability of inflight laboratory analysis instrumentation has been identified as an essential capability for manned exploration missions. Since a single, compact space-ready laboratory analysis capability to perform all exploration clinical measurements is not commercially available, the ELA project objective is to demonstrate the feasibility of emerging operational and analytical capability as a biomedical diagnostics precursor to long duration manned exploration missions. The initial step towards ground and flight demonstrations in fiscal year (FY) 2015 was the downselection of platform technologies for demonstrations in the space environment. The technologies selected included two Small Business Innovation Research (SBIR) performers: DNA Medicine Institute's rHEALTH X and Intelligent Optical System's lateral flow assays combined with Holomic's smartphone analyzer. The selection of these technologies were based on their compact size, breadth of analytical capability and favorable ability to process fluids in a space environment, among several factors. These two technologies will be advanced to meet ground and flight demonstration success criteria and requirements. The technology demonstrations and metrics for success will be finalized in FY16. Also, the downselected performers will continue the technology development phase towards meeting prototype deliverables in either late 2016 or 2017.
A prototype web-GIS application for risk analysis of natural hazards in Switzerland
NASA Astrophysics Data System (ADS)
Aye, Zar Chi; Nicolet, Pierrick; Jaboyedoff, Michel; Derron, Marc-Henri; Gerber, Christian; Lévy, Sebastien
2016-04-01
Following changes in the system of Swiss subsidy in January 2008, the Swiss cantons and the Federal Office for the Environment (FOEN) were forced to prioritize different natural hazard protection projects based on their cost-effectiveness, as a response to limited financial resources (Bründl et al., 2009). For this purpose, applications such as EconoMe (OFEV, 2016) and Valdorisk (DGE, 2016) were developed for risk evaluation and prioritization of mitigation projects. These tools serve as a useful decision-making instrument to the community of practitioners and responsible authorities for natural hazard risk management in Switzerland. However, there are several aspects which could be improved, in particular, the integration and visualization of spatial information interactively through a web-GIS interface for better risk planning and evaluation. Therefore, in this study, we aim to develop an interactive web-GIS application based on the risk concepts applied in Switzerland. The purpose of this tool is to provide a rapid evaluation of risk before and after protection measures, and to test the efficiency of measures by using a simplified cost-benefit analysis within the context of different protection projects. This application allows to integrate different layers which are necessary to calculate risk, in particular, hazard intensity (vector) maps for different scenarios (such as 30, 100 and 300 years of return periods based on Swiss guidelines), exposed objects (such as buildings) and vulnerability information of these objects. Based on provided information and additional parameters, risk is calculated automatically and results are visualized within the web-GIS interface of the application. The users can modify these input information and parameters to create different risk scenarios. Based on the resultant risk scenarios, the users can propose and visualize (preliminary) risk reduction measures before realizing the actual design and dimensions of such protective measures in the area. After designing measures, the users can re-calculate risk by updating hazard intensity and object layers. This is achieved by manual editing of shape (vector) layers in the web-GIS interface interactively. Within the application, a cost-benefit analysis tool is also integrated to support the decision-making process for the selection of different protection measures. Finally, the resultant risk information (vector layers and data) can be exported in the form of shapefiles and excel sheets. A prototype application is realized using open-source geospatial software and technologies. Boundless framework with its client-side SDK environment is applied for the rapid prototyping. Free and open source components such as PostGIS spatial database, GeoServer and GeoWebCache, GeoExt and OpenLayers are used for the development of the platform. This developed prototype is demonstrated with a case study area located in Les Diablerets, Switzerland. This research work is carried out within a project funded by the Canton of Vaud, Switzerland. References: Bründl, M., Romang, H. E., Bischof, N., and Rheinberger, C. M.: The risk concept and its application in natural hazard risk management in Switzerland, Nat. Hazards Earth Syst. Sci., 9, 801-813, 2009. DGE: Valdorisk - Direction Générale de l'Environnement, www.vd.ch, accessed 9 January 2016, 2016. OFEV: EconoMe - Office fédéral de l'environnement, www.econome.admin.ch, accessed 9 January 2016, 2016.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This document comprises Pacific Northwest National Laboratory`s report for Fiscal Year 1996 on research and development programs. The document contains 161 project summaries in 16 areas of research and development. The 16 areas of research and development reported on are: atmospheric sciences, biotechnology, chemical instrumentation and analysis, computer and information science, ecological science, electronics and sensors, health protection and dosimetry, hydrological and geologic sciences, marine sciences, materials science and engineering, molecular science, process science and engineering, risk and safety analysis, socio-technical systems analysis, statistics and applied mathematics, and thermal and energy systems. In addition, this report provides an overview ofmore » the research and development program, program management, program funding, and Fiscal Year 1997 projects.« less
Fürst, Nicole; Kiechle, Marion; Strahwald, Brigitte; Quante, Anne S
2018-05-01
The mammography screening programme has been the subject of criticism for some time. Invitation to take part is currently based only on the risk factors of age and female sex, whereby women with an above-average risk are screened too seldom and women with a low risk are possibly screened too often. In future, an individualised risk assessment could make a risk-adapted procedure possible in breast cancer screening. In the RISIKOLOTSE.DE project, schemes are devised to calculate the individual breast cancer risk and evaluate the results. The aim is to assist doctors and screening participants in participatory decision-making. To gauge the baseline situation in the target groups, qualitative and quantitative surveys were conducted. At the start of the project, a guideline-based focus group discussion was held with 15 doctors and representatives of the public health service. The transcript of this discussion was evaluated by means of a qualitative content analysis. The participants assessed the concept of risk-adapted screening positively overall. At the same time, the majority of them were of the opinion that the results of individualised risk calculation can be understood and evaluated adequately only by doctors. The great communication requirement and lack of remuneration were given as practical obstacles to implementation. The suggestions and new ideas from the focus group ranged from administrative and regulatory changes to new forms of counselling and adaptable practice aids. An important indicator for the RISIKOLOTSE.DE conception and for planning future surveys was that risk calculation for mammography screening 2.0 was regarded as a purely medical function and that the concept of participatory decision-making played hardly any part in the discussion.
The Gap Analysis Program (GAP) is a national inter-agency program that maps the distribution of plant communities and selected animal species and compares these distributions with land stewardship to identify biotic elements at potential risk of endangerment. GAP uses remote sens...
Landslide hazard assessment : LIFE+IMAGINE project methodology and Liguria region use case
NASA Astrophysics Data System (ADS)
Spizzichino, Daniele; Campo, Valentina; Congi, Maria Pia; Cipolloni, Carlo; Delmonaco, Giuseppe; Guerrieri, Luca; Iadanza, Carla; Leoni, Gabriele; Trigila, Alessandro
2015-04-01
Scope of the work is to present a methodology developed for analysis of potential impacts in areas prone to landslide hazard in the framework of the EC project LIFE+IMAGINE. The project aims to implement a web services-based infrastructure addressed to environmental analysis, that integrates, in its own architecture, specifications and results from INSPIRE, SEIS and GMES. Existing web services has been customized to provide functionalities for supporting environmental integrated management. The implemented infrastructure has been applied to landslide risk scenarios, developed in selected pilot areas, aiming at: i) application of standard procedures to implement a landslide risk analysis; ii) definition of a procedure for assessment of potential environmental impacts, based on a set of indicators to estimate the different exposed elements with their specific vulnerability in the pilot area. The landslide pilot and related scenario are focused at providing a simplified Landslide Risk Assessment (LRA) through: 1) a landslide inventory derived from available historical and recent databases and maps; 2) landslide susceptibility and hazard maps; 3) assessment of exposure and vulnerability on selected typologies of elements at risk; 4) implementation of a landslide risk scenario for different sets of exposed elements 5) development of a use case; 6) definition of guidelines, best practices and production of thematic maps. The LRA has been implemented in Liguria region, Italy, in two different catchment areas located in the Cinque Terre National Park, characterized by a high landslide susceptibility and low resilience. The landslide risk impact analysis has been calibrated taking into account the socio-economic damage caused by landslides triggered by the October 2011 meteorological event. During this event, over 600 landslides were triggered in the selected pilot area. Most of landslides affected the diffuse system of anthropogenic terraces and caused the direct disruption of the walls as well as transportation of a large amount of loose sediments along the slopes and channels as induced consequence of the event. Application of a spatial analysis detected ca. 400 critical point along the road network with an average length of about 200 m. Over 1,000 buildings were affected and damaged by the event. The exposed population in the area involved by the event has been estimated in ca. 2,600 inhabitants (people?). In the pilot area, 19 different typologies of Cultural Heritage were affected by landslide phenomena or located in zones classified as high landslide hazard. The final scope of the landslide scenario is to improve the awareness on hazard, exposure, vulnerability and landslide risk in the Cinque Terre National Park to the benefit of local authorities and population. In addition, the results of the application will be used for updating the land planning process in order to improve the resilience of local communities, ii) implementing cost-benefit analysis aimed at the definition of guidelines for sustainable landslide risk mitigation strategies, iii) suggesting a general road map for the implementation of a local adaptation plan.
DOT National Transportation Integrated Search
1971-06-01
The report summarizes the work performed at DOT/TSC on the Time/Frequency ATC System study project. Principal emphasis in this report is given to the evaluation and analysis of the technological risk areas. A survey and description of proposed T/F sy...
A platform for proactive, risk-based slope asset management, phase II.
DOT National Transportation Integrated Search
2015-03-01
The lidar visualization technique developed by this project enables highway managers to understand changes in slope characteristics : along highways. This change detection and analysis can be the basis of informed decisions for slope inspection and r...
A platform for proactive, risk-based slope asset management, phase II.
DOT National Transportation Integrated Search
2015-08-01
The lidar visualization technique developed by this project enables highway managers to understand changes : in slope characteristics along highways. This change detection and analysis can be the basis of informed : decisions for slope inspection and...
Korfmacher, Katrina Smith; Cory-Slechta, Deborah A.; Jimenez, Maria; Symanski, Elaine; Carr Shmool, Jessie L.; Dotson-Newman, Ogonnaya; Clougherty, Jane E.; French, Robert; Levy, Jonathan I.; Laumbach, Robert; Rodgers, Kathryn; Bongiovanni, Roseann; Scammell, Madeleine K.
2015-01-01
Abstract Studies have documented cumulative health effects of chemical and nonchemical exposures, particularly chronic environmental and social stressors. Environmental justice groups have advocated for community participation in research that assesses how these interactions contribute to health disparities experienced by low-income and communities of color. In 2009, the U.S. Environmental Protection Agency issued a request for research applications (RFA), “Understanding the Role of Nonchemical Stressors and Developing Analytic Methods for Cumulative Risk Assessments.” Seven research projects were funded to help address this knowledge gap. Each engaged with communities in different ways. We describe the community engagement approaches of the seven research projects, which ranged from outreach through shared leadership/participatory. We then assess the experiences of these programs with respect to the community engagement goals of the RFA. We present insights from these community engagement efforts, including how the grants helped to build or enhance the capacity of community organizations in addition to contributing to the research projects. Our analysis of project proposals, annual grantee reports, and participant observation of these seven projects suggests guidelines for the development of future funding mechanisms and for conducting community-engaged research on cumulative risk involving environmental and social stressors including: 1) providing for flexibility in the mode of community engagement; 2) addressing conflict between research timing and engagement needs, 3) developing approaches for communicating about the uniquely sensitive issues of nonchemical stressors and social risks; and 4) encouraging the evaluation of community engagement efforts. PMID:27688822
[Quality criteria in medicine: which limits?].
Minvielle, E
2006-06-01
This article aims to develop a critical appraisal of the criteria's development in medicine. The COMPAQH (Coordination for Measuring Performance and Assuring Quality in Hospitals) project (Ministry of Health/ High Authority of Health/ National Institute of Medical Research) helps to support this analysis. This project based on the test of 42 Quality indicators (QI) gives findings not only about the manner to build criteria, but also to interpret and diffuse results among physicians and hospital managers. Criteria must be elaborated in a pragmatic way. They must be in compliance with practice guidelines supported by scientific evidences. The associated risk is to create and develop a normative medicine. Collaboration with professional societies may be useful in preventing this risk.
EPRI/NRC-RES fire human reliability analysis guidelines.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Stuart R.; Cooper, Susan E.; Najafi, Bijan
2010-03-01
During the 1990s, the Electric Power Research Institute (EPRI) developed methods for fire risk analysis to support its utility members in the preparation of responses to Generic Letter 88-20, Supplement 4, 'Individual Plant Examination - External Events' (IPEEE). This effort produced a Fire Risk Assessment methodology for operations at power that was used by the majority of U.S. nuclear power plants (NPPs) in support of the IPEEE program and several NPPs overseas. Although these methods were acceptable for accomplishing the objectives of the IPEEE, EPRI and the U.S. Nuclear Regulatory Commission (NRC) recognized that they required upgrades to support currentmore » requirements for risk-informed, performance-based (RI/PB) applications. In 2001, EPRI and the USNRC's Office of Nuclear Regulatory Research (RES) embarked on a cooperative project to improve the state-of-the-art in fire risk assessment to support a new risk-informed environment in fire protection. This project produced a consensus document, NUREG/CR-6850 (EPRI 1011989), entitled 'Fire PRA Methodology for Nuclear Power Facilities' which addressed fire risk for at power operations. NUREG/CR-6850 developed high level guidance on the process for identification and inclusion of human failure events (HFEs) into the fire PRA (FPRA), and a methodology for assigning quantitative screening values to these HFEs. It outlined the initial considerations of performance shaping factors (PSFs) and related fire effects that may need to be addressed in developing best-estimate human error probabilities (HEPs). However, NUREG/CR-6850 did not describe a methodology to develop best-estimate HEPs given the PSFs and the fire-related effects. In 2007, EPRI and RES embarked on another cooperative project to develop explicit guidance for estimating HEPs for human failure events under fire generated conditions, building upon existing human reliability analysis (HRA) methods. This document provides a methodology and guidance for conducting a fire HRA. This process includes identification and definition of post-fire human failure events, qualitative analysis, quantification, recovery, dependency, and uncertainty. This document provides three approaches to quantification: screening, scoping, and detailed HRA. Screening is based on the guidance in NUREG/CR-6850, with some additional guidance for scenarios with long time windows. Scoping is a new approach to quantification developed specifically to support the iterative nature of fire PRA quantification. Scoping is intended to provide less conservative HEPs than screening, but requires fewer resources than a detailed HRA analysis. For detailed HRA quantification, guidance has been developed on how to apply existing methods to assess post-fire fire HEPs.« less
NASA Astrophysics Data System (ADS)
Yuan, J.; Kopp, R. E.
2017-12-01
Quantitative risk analysis of regional climate change is crucial for risk management and impact assessment of climate change. Two major challenges to assessing the risks of climate change are: CMIP5 model runs, which drive EURO-CODEX downscaling runs, do not cover the full range of uncertainty of future projections; Climate models may underestimate the probability of tail risks (i.e. extreme events). To overcome the difficulties, this study offers a viable avenue, where a set of probabilistic climate ensemble is generated using the Surrogate/Model Mixed Ensemble (SMME) method. The probabilistic ensembles for temperature and precipitation are used to assess the range of uncertainty covered by five bias-corrected simulations from the high-resolution (0.11º) EURO-CODEX database, which are selected by the PESETA (The Projection of Economic impacts of climate change in Sectors of the European Union based on bottom-up Analysis) III project. Results show that the distribution of SMME ensemble is notably wider than both distribution of raw ensemble of GCMs and the spread of the five EURO-CORDEX in RCP8.5. Tail risks are well presented by the SMME ensemble. Both SMME ensemble and EURO-CORDEX projections are aggregated to administrative level, and are integrated into impact functions of PESETA III to assess climate risks in Europe. To further evaluate the uncertainties introduced by the downscaling process, we compare the 5 runs from EURO-CORDEX with runs from the corresponding GCMs. Time series of regional mean, spatial patterns, and climate indices are examined for the future climate (2080-2099) deviating from the present climate (1981-2010). The downscaling processes do not appear to be trend-preserving, e.g. the increase in regional mean temperature from EURO-CORDEX is slower than that from the corresponding GCM. The spatial pattern comparison reveals that the differences between each pair of GCM and EURO-CORDEX are small in winter. In summer, the temperatures of EURO-CORDEX are generally lower than those of GCMs, while the drying trends in precipitation of EURO-CORDEX are smaller than those of GCMs. Climate indices are significantly affected by bias-correction and downscaling process. Our study provides valuable information for selecting climate indices in different regions over Europe.
Project Delivery System Mode Decision Based on Uncertain AHP and Fuzzy Sets
NASA Astrophysics Data System (ADS)
Kaishan, Liu; Huimin, Li
2017-12-01
The project delivery system mode determines the contract pricing type, project management mode and the risk allocation among all participants. Different project delivery system modes have different characteristics and applicable scope. For the owners, the selection of the delivery mode is the key point to decide whether the project can achieve the expected benefits, it relates to the success or failure of project construction. Under the precondition of comprehensively considering the influence factors of the delivery mode, the model of project delivery system mode decision was set up on the basis of uncertain AHP and fuzzy sets, which can well consider the uncertainty and fuzziness when conducting the index evaluation and weight confirmation, so as to rapidly and effectively identify the most suitable delivery mode according to project characteristics. The effectiveness of the model has been verified via the actual case analysis in order to provide reference for the construction project delivery system mode.
Cross-Cutting Risk Framework: Mining Data for Common Risks Across the Portfolio
NASA Technical Reports Server (NTRS)
Klein, Gerald A., Jr.; Ruark, Valerie
2017-01-01
The National Aeronautics and Space Administration (NASA) defines risk management as an integrated framework, combining risk-informed decision making and continuous risk management to foster forward-thinking and decision making from an integrated risk perspective. Therefore, decision makers must have access to risks outside of their own project to gain the knowledge that provides the integrated risk perspective. Through the Goddard Space Flight Center (GSFC) Flight Projects Directorate (FPD) Business Change Initiative (BCI), risks were integrated into one repository to facilitate access to risk data between projects. With the centralized repository, communications between the FPD, project managers, and risk managers improved and GSFC created the cross-cutting risk framework (CCRF) team. The creation of the consolidated risk repository, in parallel with the initiation of monthly FPD risk managers and risk governance board meetings, are now providing a complete risk management picture spanning the entire directorate. This paper will describe the challenges, methodologies, tools, and techniques used to develop the CCRF, and the lessons learned as the team collectively worked to identify risks that FPD programs projects had in common, both past and present.
NASA Technical Reports Server (NTRS)
Ghaffarian, Reza; Evans, John W.
2014-01-01
For five decades, the semiconductor industry has distinguished itself by the rapid pace of improvement in miniaturization of electronics products-Moore's Law. Now, scaling hits a brick wall, a paradigm shift. The industry roadmaps recognized the scaling limitation and project that packaging technologies will meet further miniaturization needs or ak.a "More than Moore". This paper presents packaging technology trends and accelerated reliability testing methods currently being practiced. Then, it presents industry status on key advanced electronic packages, factors affecting accelerated solder joint reliability of area array packages, and IPC/JEDEC/Mil specifications for characterizations of assemblies under accelerated thermal and mechanical loading. Finally, it presents an examples demonstrating how Accelerated Testing and Analysis have been effectively employed in the development of complex spacecraft thereby reducing risk. Quantitative assessments necessarily involve the mathematics of probability and statistics. In addition, accelerated tests need to be designed which consider the desired risk posture and schedule for particular project. Such assessments relieve risks without imposing additional costs. and constraints that are not value added for a particular mission. Furthermore, in the course of development of complex systems, variances and defects will inevitably present themselves and require a decision concerning their disposition, necessitating quantitative assessments. In summary, this paper presents a comprehensive view point, from technology to systems, including the benefits and impact of accelerated testing in offsetting risk.
UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less
NASA Astrophysics Data System (ADS)
Amin, Asad; Nasim, Wajid; Mubeen, Muhammad; Sarwar, Saleem; Urich, Peter; Ahmad, Ashfaq; Wajid, Aftab; Khaliq, Tasneem; Rasul, Fahd; Hammad, Hafiz Mohkum; Rehmani, Muhammad Ishaq Asif; Mubarak, Hussani; Mirza, Nosheen; Wahid, Abdul; Ahamd, Shakeel; Fahad, Shah; Ullah, Abid; Khan, Mohammad Nauman; Ameen, Asif; Amanullah; Shahzad, Babar; Saud, Shah; Alharby, Hesham; Ata-Ul-Karim, Syed Tahir; Adnan, Muhammad; Islam, Faisal; Ali, Qazi Shoaib
2018-01-01
Unbalanced climate during the last decades has created spatially alarming and destructive situations in the world. Anomalies in temperature and precipitation enhance the risks for crop production in large agricultural region (especially the Southern Punjab) of Pakistan. Detailed analysis of historic weather data (1980-2011) record helped in creating baseline data to compare with model projection (SimCLIM) for regional level. Ensemble of 40 GCMs used for climatic projections with greenhouse gas (GHG) representative concentration pathways (RCP-4.5, 6.0, 8.5) was selected on the baseline comparison and used for 2025 and 2050 climate projection. Precipitation projected by ensemble and regional weather observatory at baseline showed highly unpredictable nature while both temperature extremes showed 95 % confidence level on a monthly projection. Percentage change in precipitation projected by model with RCP-4.5, RCP-6.0, and RCP-8.5 showed uncertainty 3.3 to 5.6 %, 2.9 to 5.2 %, and 3.6 to 7.9 % for 2025 and 2050, respectively. Percentage change of minimum temperature from base temperature showed that 5.1, 4.7, and 5.8 % for 2025 and 9.0, 8.1, and 12.0 % increase for projection year 2050 with RCP-4.5, 6.0, and 8.5 and maximum temperature 2.7, 2.5, and 3.0 % for 2025 and 4.7, 4.4, and 6.4 % for 2050 will be increased with RCP-4.5, 6.0, and 8.5, respectively. Uneven increase in precipitation and asymmetric increase in temperature extremes in future would also increase the risk associated with management of climatic uncertainties. Future climate projection will enable us for better risk management decisions.
Operational Implementation of a Pc Uncertainty Construct for Conjunction Assessment Risk Analysis
NASA Technical Reports Server (NTRS)
Newman, Lauri K.; Hejduk, Matthew D.; Johnson, Lauren C.
2016-01-01
Earlier this year the NASA Conjunction Assessment and Risk Analysis (CARA) project presented the theoretical and algorithmic aspects of a method to include the uncertainties in the calculation inputs when computing the probability of collision (Pc) between two space objects, principally uncertainties in the covariances and the hard-body radius. The output of this calculation approach is to produce rather than a single Pc value an entire probability density function that will represent the range of possible Pc values given the uncertainties in the inputs and bring CA risk analysis methodologies more in line with modern risk management theory. The present study provides results from the exercise of this method against an extended dataset of satellite conjunctions in order to determine the effect of its use on the evaluation of conjunction assessment (CA) event risk posture. The effects are found to be considerable: a good number of events are downgraded from or upgraded to a serious risk designation on the basis of consideration of the Pc uncertainty. The findings counsel the integration of the developed methods into NASA CA operations.
Review of issues and challenges for public private partnership (PPP) project performance in Malaysia
NASA Astrophysics Data System (ADS)
Hashim, H.; Che-Ani, A. I.; Ismail, K.
2017-10-01
Public Private Partnership (PPP) in Malaysia aims to stimulate economic growth and overcome the weakness of conventional system. Over the years, many critics have been reported along the massive growth of PPP project development. Within that context, this study provides a review of issues and challenges for PPP pertaining to project performance in Malaysia. The study also attempts to investigate four performance measurement models around the globe as a basis for improvement of PPP in Malaysia. A qualitative method was used to analyse literature review from previous published literatures while comparative analysis was carried out within the models to identify their advantages and disadvantages. The findings show that the issues and challenges occurred were related to human, technical and financial factor that could hinder the implementation of PPP project in Malaysia. From the analysis, KPIs, guideline / framework, risk allocation, efficiency & flexibility are perceived as dominant issues. Finally, the findings provide an informed basis on the opportunity areas to be considered for improvement in order to achieved project effectiveness.
Risk assessment as standard work in design.
Morrill, Patricia W
2013-01-01
This case study article examines a formal risk assessment as part of the decision making process for design solutions in high risk areas. The overview of the Failure Modes and Effects Analysis (FMEA) tool with examples of its application in hospital building projects will demonstrate the benefit of those structured conversations. This article illustrates how two hospitals used FMEA when integrating operational processes with building projects: (1) adjacency decision for Intensive Care Unit (ICU); and (2) distance concern for handling of specimens from Surgery to Lab. Both case studies involved interviews that exposed facility solution concerns. Just-in-time studies using the FMEA followed the same risk assessment process with the same workshop facilitator involving structured conversations in analyzing risks. In both cases, participants uncovered key areas of risk enabling them to take the necessary next steps. While the focus of this article is not the actual design solution, it is apparent that the risk assessment brought clarity to the situations resulting in prompt decision making about facility solutions. Hospitals are inherently risky environments; therefore, use of the formal risk assessment process, FMEA, is an opportunity for design professionals to apply more rigor to design decision making when facility solutions impact operations in high risk areas. Case study, decision making, hospital, infection control, strategy, work environment.
NASA Technical Reports Server (NTRS)
Banks, Akeem
2012-01-01
This final report will summarize research that relates to human behavioral health and performance of astronauts and flight controllers. Literature reviews, data archival analyses, and ground-based analog studies that center around the risk of human space flight are being used to help mitigate human behavior and performance risks from long duration space flights. A qualitative analysis of an astronaut autobiography was completed. An analysis was also conducted on exercise countermeasure publications to show the positive affects of exercise on the risks targeted in this study. The three main risks targeted in this study are risks of behavioral and psychiatric disorders, risks of performance errors due to poor team performance, cohesion, and composition, and risks of performance errors due to sleep deprivation, circadian rhythm. These three risks focus on psychological and physiological aspects of astronauts who venture out into space on long duration space missions. The purpose of this research is to target these risks in order to help quantify, identify, and mature countermeasures and technologies required in preventing or mitigating adverse outcomes from exposure to the spaceflight environment
NASA Technical Reports Server (NTRS)
Adams, Thomas; VanBaalen, Mary
2009-01-01
The Radiation Health Office (RHO) determines each astronaut s cancer risk by using models to associate the amount of radiation dose that astronauts receive from spaceflight missions. The baryon transport codes (BRYNTRN), high charge (Z) and energy transport codes (HZETRN), and computer risk models are used to determine the effective dose received by astronauts in Low Earth orbit (LEO). This code uses an approximation of the Boltzman transport formula. The purpose of the project is to run this code for various International Space Station (ISS) flight parameters in order to gain a better understanding of how this code responds to different scenarios. The project will determine how variations in one set of parameters such as, the point of the solar cycle and altitude can affect the radiation exposure of astronauts during ISS missions. This project will benefit NASA by improving mission dosimetry.
A review on disaster risk mitigation in the oil and gas project
NASA Astrophysics Data System (ADS)
Rodhi, N. N.; Anwar, N.; Wiguna, I. P. A.
2018-01-01
In addition to the very complex risks, hazards potentially lead to disasters in the oil and gas projects. These risks can certainly be anticipated with the application of risk management, but an unsystematic and ineffective implementation of risk management will still bring adverse impacts. According to the eleven risk management principles in ISO 31000:2009, the application of risk management must pay attention to all aspects, both internal and external factors. Thus, this paper aims to identify variables that could affect the disaster mitigation efforts of oil and gas projects. This research began with literature study to determine the problems of risk management in oil and gas projects, so the affecting variables as the study objectives can be specified subsequently based on the literature review as well. The variables that must be considered in the efforts of disaster risk mitigation of oil and gas project are the risk factors and sustainability aspect.
Why projects often fail even with high cost contingencies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kujawski, Edouard
2002-02-28
In this note we assume that the individual risks have been adequately quantified and the total project cost contingency adequately computed to ensure an agreed-to probability or confidence level that the total project cost estimate will not be exceeded. But even projects that implement such a process are likely to result in significant cost overruns and/or project failure if the project manager allocates the contingencies to the individual subsystems. The intuitive and mathematically valid solution is to maintain a project-wide contingency and to distribute it to the individual risks on an as-needed basis. Such an approach ensures cost-efficient risk management,more » and projects that implement it are more likely to succeed and to cost less. We illustrate these ideas using a simplified project with two independent risks. The formulation can readily be extended to multiple risks.« less
JCL Implementation On A Human Spaceflight Program
NASA Technical Reports Server (NTRS)
Kulpa, Vyga; Karpowich, Mike; Abel, Diana; Archiable, Wes; Carson, William
2013-01-01
Joint Confidence Level (JCL) analysis focuses on the integration of traditionally stove-piped programmatic components (schedule, cost and risk) to establish projected resource and schedule requirements at various confidence levels and to identify programmatic cost and schedule risk drivers. SLS Program consists of multiple Prime Contractors managed by independent SLS Elements which are integrated using SE&I and Program Management. SLS further integrates with GSDO and MPCV through ESD integrated working groups.
Cassandra Johnson Gaither; N.C. Poudyal; S. Goodrick; J.M. Bowker; S. Malone; J. Gan
2011-01-01
The southeastern U.S. is one of the more wildland fire prone areas of the country and also contains some of the poorest or most socially vulnerable rural communities. Our project addresses wildland fire risk in this part of the U.S and its intersection with social vulnerability. We examine spatial association between high wildland fire prone areas which also rank high...
Tan, Aimin; Saffaj, Taoufiq; Musuku, Adrien; Awaiye, Kayode; Ihssane, Bouchaib; Jhilal, Fayçal; Sosse, Saad Alaoui; Trabelsi, Fethi
2015-03-01
The current approach in regulated LC-MS bioanalysis, which evaluates the precision and trueness of an assay separately, has long been criticized for inadequate balancing of lab-customer risks. Accordingly, different total error approaches have been proposed. The aims of this research were to evaluate the aforementioned risks in reality and the difference among four common total error approaches (β-expectation, β-content, uncertainty, and risk profile) through retrospective analysis of regulated LC-MS projects. Twenty-eight projects (14 validations and 14 productions) were randomly selected from two GLP bioanalytical laboratories, which represent a wide variety of assays. The results show that the risk of accepting unacceptable batches did exist with the current approach (9% and 4% of the evaluated QC levels failed for validation and production, respectively). The fact that the risk was not wide-spread was only because the precision and bias of modern LC-MS assays are usually much better than the minimum regulatory requirements. Despite minor differences in magnitude, very similar accuracy profiles and/or conclusions were obtained from the four different total error approaches. High correlation was even observed in the width of bias intervals. For example, the mean width of SFSTP's β-expectation is 1.10-fold (CV=7.6%) of that of Saffaj-Ihssane's uncertainty approach, while the latter is 1.13-fold (CV=6.0%) of that of Hoffman-Kringle's β-content approach. To conclude, the risk of accepting unacceptable batches was real with the current approach, suggesting that total error approaches should be used instead. Moreover, any of the four total error approaches may be used because of their overall similarity. Lastly, the difficulties/obstacles associated with the application of total error approaches in routine analysis and their desirable future improvements are discussed. Copyright © 2015 Elsevier B.V. All rights reserved.
Risk-Significant Adverse Condition Awareness Strengthens Assurance of Fault Management Systems
NASA Technical Reports Server (NTRS)
Fitz, Rhonda
2017-01-01
As spaceflight systems increase in complexity, Fault Management (FM) systems are ranked high in risk-based assessment of software criticality, emphasizing the importance of establishing highly competent domain expertise to provide assurance. Adverse conditions (ACs) and specific vulnerabilities encountered by safety- and mission-critical software systems have been identified through efforts to reduce the risk posture of software-intensive NASA missions. Acknowledgement of potential off-nominal conditions and analysis to determine software system resiliency are important aspects of hazard analysis and FM. A key component of assuring FM is an assessment of how well software addresses susceptibility to failure through consideration of ACs. Focus on significant risk predicted through experienced analysis conducted at the NASA Independent Verification & Validation (IV&V) Program enables the scoping of effective assurance strategies with regard to overall asset protection of complex spaceflight as well as ground systems. Research efforts sponsored by NASAs Office of Safety and Mission Assurance (OSMA) defined terminology, categorized data fields, and designed a baseline repository that centralizes and compiles a comprehensive listing of ACs and correlated data relevant across many NASA missions. This prototype tool helps projects improve analysis by tracking ACs and allowing queries based on project, mission type, domain/component, causal fault, and other key characteristics. Vulnerability in off-nominal situations, architectural design weaknesses, and unexpected or undesirable system behaviors in reaction to faults are curtailed with the awareness of ACs and risk-significant scenarios modeled for analysts through this database. Integration within the Enterprise Architecture at NASA IV&V enables interfacing with other tools and datasets, technical support, and accessibility across the Agency. This paper discusses the development of an improved workflow process utilizing this database for adaptive, risk-informed FM assurance that critical software systems will safely and securely protect against faults and respond to ACs in order to achieve successful missions.
Risk-Significant Adverse Condition Awareness Strengthens Assurance of Fault Management Systems
NASA Technical Reports Server (NTRS)
Fitz, Rhonda
2017-01-01
As spaceflight systems increase in complexity, Fault Management (FM) systems are ranked high in risk-based assessment of software criticality, emphasizing the importance of establishing highly competent domain expertise to provide assurance. Adverse conditions (ACs) and specific vulnerabilities encountered by safety- and mission-critical software systems have been identified through efforts to reduce the risk posture of software-intensive NASA missions. Acknowledgement of potential off-nominal conditions and analysis to determine software system resiliency are important aspects of hazard analysis and FM. A key component of assuring FM is an assessment of how well software addresses susceptibility to failure through consideration of ACs. Focus on significant risk predicted through experienced analysis conducted at the NASA Independent Verification Validation (IVV) Program enables the scoping of effective assurance strategies with regard to overall asset protection of complex spaceflight as well as ground systems. Research efforts sponsored by NASA's Office of Safety and Mission Assurance defined terminology, categorized data fields, and designed a baseline repository that centralizes and compiles a comprehensive listing of ACs and correlated data relevant across many NASA missions. This prototype tool helps projects improve analysis by tracking ACs and allowing queries based on project, mission type, domaincomponent, causal fault, and other key characteristics. Vulnerability in off-nominal situations, architectural design weaknesses, and unexpected or undesirable system behaviors in reaction to faults are curtailed with the awareness of ACs and risk-significant scenarios modeled for analysts through this database. Integration within the Enterprise Architecture at NASA IVV enables interfacing with other tools and datasets, technical support, and accessibility across the Agency. This paper discusses the development of an improved workflow process utilizing this database for adaptive, risk-informed FM assurance that critical software systems will safely and securely protect against faults and respond to ACs in order to achieve successful missions.
Climate Change Risk Management Consulting: The opportunity for an independent business practice
NASA Astrophysics Data System (ADS)
Ciccozzi, R.
2009-04-01
The Paper outlines the main questions to be addressed with reference to the actual demand of climate change risk management consulting, in the financial services. Moreover, the Project shall also try to investigate if the Catastrophe Modelling Industry can start and manage a business practice specialised on climate change risk exposures. In this context, the Paper aims at testing the possibility to build a sound business case, based upon typical MBA course analysis tools, such as PEST(LE), SWOT, etc. Specific references to the tools to be used and to other contribution from academic literature and general documentation are also discussed in the body of the Paper and listed at the end. The analysis shall also focus on the core competencies required for an independent climate change risk management consulting business practice, with the purpose to outline a valid definition of how to achieve competitive advantage in climate change risk management consulting.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lottes, S.A.; Kulak, R.F.; Bojanowski, C.
2011-08-26
The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. Themore » analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water loads on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to assess them for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, vehicle stability under high wind loading, and the use of electromagnetic shock absorbers to improve vehicle stability under high wind conditions. This quarterly report documents technical progress on the project tasks for the period of April through June 2011.« less
2013-01-01
Background High risk prescribing can compromise independent wellbeing and quality of life in older adults. The aims of this project are to determine the prevalence, risk factors, clinical consequences, and costs of high risk prescribing, and to assess the impact of interventions on high risk prescribing in older people. Methods The proposed project will utilise data from the 45 and Up Study, a large scale cohort of 267,153 men and women aged 45 and over recruited during 2006–2009 from the state of New South Wales, Australia linked to a range of administrative health datasets. High risk prescribing will be assessed using three indicators: polypharmacy (use of five or more medicines); Beers Criteria (an explicit measure of potentially inappropriate medication use); and Drug Burden Index (a pharmacologic dose-dependent measure of cumulative exposure to anticholinergic and sedative medicines). Individual risk factors from the 45 and Up Study questionnaire, and health system characteristics from health datasets that are associated with the likelihood of high risk prescribing will be identified. The main outcome measures will include hospitalisation (first admission to hospital, total days in hospital, cause-specific hospitalisation); admission to institutionalised care; all-cause mortality, and, where possible, cause-specific mortality. Economic costs to the health care system and implications of high risk prescribing will be also investigated. In addition, changes in high risk prescribing will be evaluated in relation to certain routine medicines-related interventions. The statistical analysis will be conducted using standard pharmaco-epidemiological methods including descriptive analysis, univariate and multivariate regression analysis, controlling for relevant confounding factors, using a number of different approaches. Discussion The availability of large-scale data is useful to identify opportunities for improving prescribing, and health in older adults. The size of the 45 and Up Study, along with linkage to health databases provides an important opportunity to investigate the relationship between high risk prescribing and adverse outcomes in a real-world population of older adults. PMID:23388494
Risk factors associated with high potential for serious crashes.
DOT National Transportation Integrated Search
2015-09-01
Crashes are random events and low traffic volumes therefore dont always make crash hot-spot : identification possible. This project has used extensive data collection and analysis for a large sample : of Oregons low volume roads to develop a ri...
PROTEOMIC ANALYSIS OF ALLERGENS FROM METARHIZIUM ANISOPLIAE
Introduction
The goal of this project is the identification and characterization of allergens from the fungus Metarhizium anisopliae, using mass spectrometry (MS). The US EPA, under the "Children at Risk" program, is currently addressing the problem of indoor fungal bioaer...
Susceptibility of selected ornamental plants to Phytophthora ramorum
K. Kaminski; S. Wagner; S. Werres
2008-01-01
Within the European project ?Risk Analysis for Phytophthora ramorum? (RAPRA), susceptibility of economically and ecologically important plants in Europe towards P. ramorum was tested via in vitro inoculation methods. In these studies different species and/or cultivars of Buxus, Calluna...
PROTEOMIC ANALYSIS OF ALLERGENS FROM METARHIZIUM ANISOPLIEA
The goal of this project is the identification and characterization of allergens from the fungus M. Anisopliae, using mass spectrometry (MS). The US EPA, under the "Children at Risk" program, is currently addressing the problem of indoor fungal bioaerosol contamination. One of ...
NASA Astrophysics Data System (ADS)
Rizzi, Jonathan; Torresan, Silvia; Gallina, Valentina; Critto, Andrea; Marcomini, Antonio
2013-04-01
Europe's coast faces a variety of climate change threats from extreme high tides, storm surges and rising sea levels. In particular, it is very likely that mean sea level rise will contribute to upward trends in extreme coastal high water levels, thus posing higher risks to coastal locations currently experiencing coastal erosion and inundation processes. In 2007 the European Commission approved the Flood Directive (2007/60/EC), which has the main purpose to establish a framework for the assessment and management of flood risks for inland and coastal areas, thus reducing the adverse consequences for human health, the environment, cultural heritage and economic activities. Improvements in scientific understanding are thus needed to inform decision-making about the best strategies for mitigating and managing storm surge risks in coastal areas. The CLIMDAT project is aimed at improving the understanding of the risks related to extreme storm surge events in the coastal area of the North Adriatic Sea (Italy), considering potential climate change scenarios. The project implements a Regional Risk Assessment (RRA) methodology developed in the FP7 KULTURisk project for the assessment of physical/environmental impacts posed by flood hazards and employs the DEcision support SYstem for Coastal climate change impact assessment (DESYCO) for the application of the methodology to the case study area. The proposed RRA methodology is aimed at the identification and prioritization of targets and areas at risk from water-related natural hazards in the considered region at the meso-scale. To this aim, it integrates information about extreme storm surges with bio-geophysical and socio-economic information (e.g. vegetation cover, slope, soil type, population density) of the analyzed receptors (i.e. people, economic activities, cultural heritages, natural and semi-natural systems). Extreme storm surge hazard scenarios are defined using tide gauge time series coming from 28 tide gauge stations located in the North Adriatic coastal areas from 1989 to 2011. These data, together with the sea-level rise scenarios for the considered future timeframe, represent the input for the application of the Joint Probability method (Pugh and Vassie, 1979), which allows the evaluation of the maximum height of extreme storm surge events with different return period and the number of extreme events per year. The methodology uses Geographic Information Systems to manage, process, analyse, and visualize data and employs Multi-Criteria Decision Analysis to integrate stakeholders preferences and experts judgments into the analysis in order to obtain a total risk index in the considered region. The final outputs are represented by GIS-based risk maps which allow the communication of the potential consequences of extreme storm surge to decision makers and stakeholders. Moreover, they can support the establishment of relative priorities for intervention through the identification of suitable areas for human settlements, infrastructures and economic activities. Finally the produced output can represent a basis for definition of storm surge hazard and storm surge risk management plans according to the Floods Directive. The preliminary results of the RRA application in the CLIMDAT project will be here presented and discussed.
NASA Astrophysics Data System (ADS)
Davis, Adam Christopher
This research develops a new framework for evaluating the occupational risks of exposure to hazardous substances in any setting where As Low As Reasonably Achievable (ALARA) practices are mandated or used. The evaluation is performed by developing a hypothesis-test-based procedure for evaluating the homogeneity of various epidemiological cohorts, and thus the appropriateness of the application of aggregate data-pooling techniques to those cohorts. A statistical methodology is then developed as an alternative to aggregate pooling for situations in which individual cohorts show heterogeneity between them and are thus unsuitable for pooled analysis. These methods are then applied to estimate the all-cancer mortality risks incurred by workers at four Department-of-Energy nuclear weapons laboratories. Both linear, no-threshold and dose-bin averaged risks are calculated and it is further shown that aggregate analysis tends to overestimate the risks with respect to those calculated by the methods developed in this work. The risk estimates developed in Chapter 2 are, in Chapter 3, applied to assess the risks to workers engaged in americium recovery operations at Los Alamos National Laboratory. The work described in Chapter 3 develops a full radiological protection assessment for the new americium recovery project, including development of exposure cases, creation and modification of MCNP5 models, development of a time-and-motion study, and the final synthesis of all data. This work also develops a new risk-based method of determining whether administrative controls, such as staffing increases, are ALARA-optimized. The EPA's estimate of the value of statistical life is applied to these risk estimates to determine a monetary value for risk. The rate of change of this "risk value" (marginal risk) is then compared with the rate of change of workers' compensations as additional workers are added to the project to reduce the dose (and therefore, presumably, risk) to each individual.
NASA Astrophysics Data System (ADS)
Ermert, V.; Fink, A. H.; Paeth, H.; Morse, A. P.
2012-04-01
The projected climate change will probably alter the range and transmission potential of malaria in Africa. The potential impacts of climate change on the malaria distribution is assessed for tropical Africa. Bias-corrected regional climate projections with a horizontal resolution of 0.5° are used from the Regional Model (REMO), which include land use and land cover changes. The malaria models employed are the 2010 version of the Liverpool Malaria Model (LMM2010), the Garki model, the Plasmodium falciparum infection model from Smith et al. (2005) (S2005), and the Malaria Seasonality Model (MSM) from the Mapping Malaria Risk in Africa project. The results of the models are compared with data from the Malaria Atlas Project (MAP) and novel validation procedures for the LMM2010 and MSM lend more credence to their results. For climate scenarios A1B and B1 and for 2001-2050, REMO projects an overall drying and warming trend in the African malaria belt, that is largely imposed by the man-made degradation of vegetation. As a result, the malaria projections show a decreased malaria spread in West Africa. The northern Sahel is no more suitable for malaria in the projections. More unstable malaria transmission and shorter malaria seasons are expected for various areas farther south. An increase in the malaria epidemic risk is found for more densely populated areas in the southern part of the Sahel. In East Africa, higher temperatures and nearly unchanged precipitation patterns lead to longer transmission seasons and an increase in the area of highland malaria. For altitudes up to 2000 m the malaria transmission stabilises and the epidemic risk is reduced but for higher altitudes the risk of malaria epidemics is increased. The results of the more complex and simple malaria models are similar to each other. However, a different response to the warming of highlands is found for the LMM2010 and MSM. This shows the requirement of a multi model uncertainty analysis for the projection of the future malaria spread.
NASA Astrophysics Data System (ADS)
Husin, Saiful; Abdullah, Riza, Medyan; Afifuddin, Mochammad
2017-11-01
Risk can be defined as consequences which possible happened inscrutably. Although an activity has planned as good as possible, but it keep contains uncertainty. Implementation of construction project was encountering various risk impacts from a number of risk factors. This study was intended to analyze the impacts of construction cost to for contractor firms as construction project executor related to the factors of manpower, material and equipment. The study was using data obtained from questionnaires distributed to 15 large qualification contractor firms. The period of study classified into conflict period (2000-2004), post tsunami disaster rehabilitation and reconstruction period (2005-2009), and post rehabilitation and reconstruction period (2010-present). The statistical analysis of severity index and variance used to analyze the data. The three risk factors reviewed generally affected the cost in a medium impact. The high impact occurred in minor variables, which are `increase in material prices', `theft of materials', and `the fuel scarcity'. In overall, the three risk factors and the observed period contributed significant impact on construction costs.
GIS, Geoscience, Multi-criteria Analysis and Integrated Management of the Coastal Zone
NASA Astrophysics Data System (ADS)
Kacimi, Y.; Barich, A.
2011-12-01
In this 3rd millennium, geology can be considered as a science of decision that intervenes in all the society domains. It has passed its academic dimension to spread toward some domains that until now were out of reach. Combining different Geoscience sub-disciplines emanates from a strong will to demonstrate the contribution of this science and its impact on the daily life, especially by making it applicable to various innovative projects. Geophysics, geochemistry and structural geology are complementary disciplines that can be applied in perfect symbiosis in many domains like construction, mining prospection, impact assessment, environment, etc. This can be proved by using collected data from these studies and integrate them into Geographic Information Systems (GIS), in order to make a multi-criteria analysis, which gives generally very impressive results. From this point, it is easy to set mining, eco-geotouristic and risk assessment models in order to establish land use projects but also in the case of integrated management of the coastal zone (IMCZ). Touristic projects in Morocco focus on its coast which represents at least 3500 km ; the management of this zone for building marinas or touristic infrastructures requires a deep and detailed study of marine currents on the coast, for example, by creating surveillance models and a coastal hazards map. An innovative project that will include geophysical, geochemical and structural geology studies associated to a multi-criteria analysis. The data will be integrated into a GIS to establish a coastal map that will highlight low-risk erosion zones and thus will facilitate implementation of ports and other construction projects. YES Morocco is a chapter of the International YES Network that aims to promote Geoscience in the service of society and professional development of Young and Early Career Geoscientists. Our commitment for such project will be of qualitative aspect into an associative framework that will involve young and early career geoscientists from various sub-disciplines. This project will allow them to valorize their experience but also to enrich the settling of research schedules concerning IMCZ and other Geoscience sustainable development-related domains. Besides, a very interesting experience in projects leadership and financial management will be acquired.
An Exploratory Study of Risk Factors for Implementing Service-Oriented IS Projects
NASA Astrophysics Data System (ADS)
Chang, Hsin-Lu; Lue, Chia-Pei
For IS project managers, how to implement the projects successfully is always a challenge. Further, as more and more enterprises start to develop service-oriented IS projects, it is essential to assess the sources and impacts of relevant risks. This research aimed at identifying risk factors related to service-oriented IS projects and analyzing the impact of these risk factors. Applying the SIMM (service integrated maturity model) proposed by IBM, customer service systems were selected to justify the research framework. Result showed that the risk factors influencing the adoption of service-oriented systems were insufficient technology planning, lack of expertise, ineffective project governance, and organizational misalignment, listed in the order of strength of influence. The findings of this research is expected to assist managers realize the risks and the importance of these risks that have to be noticed and controlled when making decisions on service-oriented systems adoption.
Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project
NASA Astrophysics Data System (ADS)
Sanders, Gary H.
2008-07-01
TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.
Analysis of percent density estimates from digital breast tomosynthesis projection images
NASA Astrophysics Data System (ADS)
Bakic, Predrag R.; Kontos, Despina; Zhang, Cuiping; Yaffe, Martin J.; Maidment, Andrew D. A.
2007-03-01
Women with dense breasts have an increased risk of breast cancer. Breast density is typically measured as the percent density (PD), the percentage of non-fatty (i.e., dense) tissue in breast images. Mammographic PD estimates vary, in part, due to the projective nature of mammograms. Digital breast tomosynthesis (DBT) is a novel radiographic method in which 3D images of the breast are reconstructed from a small number of projection (source) images, acquired at different positions of the x-ray focus. DBT provides superior visualization of breast tissue and has improved sensitivity and specificity as compared to mammography. Our long-term goal is to test the hypothesis that PD obtained from DBT is superior in estimating cancer risk compared with other modalities. As a first step, we have analyzed the PD estimates from DBT source projections since the results would be independent of the reconstruction method. We estimated PD from MLO mammograms (PD M) and from individual DBT projections (PD T). We observed good agreement between PD M and PD T from the central projection images of 40 women. This suggests that variations in breast positioning, dose, and scatter between mammography and DBT do not negatively affect PD estimation. The PD T estimated from individual DBT projections of nine women varied with the angle between the projections. This variation is caused by the 3D arrangement of the breast dense tissue and the acquisition geometry.
Catastrophe risk data scoping for disaster risk finance in Asia
NASA Astrophysics Data System (ADS)
Millinship, Ian; Revilla-Romero, Beatriz
2017-04-01
Developing countries across Latin America, Africa, and Asia are some of the most exposed to natural catastrophes in the world. Over the last 20 years, Asia has borne almost half the estimated global economic cost of natural disasters - around 53billion annually. Losses from natural disasters can damage growth and hamper economic development and unlike in developed countries where risk is reallocated through re/insurance, typically these countries rely on budget reallocations and donor assistance in order to attempt to meet financing needs. There is currently an active international dialogue on the need to increase access to disaster risk financing solutions in Asia. The World Bank-GFDRR Disaster Risk Financing and Insurance Program with financial support from the Rockefeller Foundation, is currently working to develop regional options for disaster risk financing for developing countries in Asia. The first stage of this process has been to evaluate available catastrophe data suitable to support the design and implementation of disaster risk financing mechanisms in selected Asian countries. This project was carried out by a consortium of JBA Risk Management, JBA Consulting, ImageCat and Cat Risk Intelligence. The project focuses on investigating potential data sources for fourteen selected countries in Asia, for flood, tropical cyclone, earthquake and drought perils. The project was carried out under four stages. The first phase focused to identify and catalogue live/dynamic hazard data sources such as hazard gauging networks, or earth observations datasets which could be used to inform a parametric trigger. Live data sources were identified that provide credibility, transparency, independence, frequent reporting, consistency and stability. Data were catalogued at regional level, and prioritised at local level for five countries: Bangladesh, Indonesia, Pakistan, Sri Lanka and Viet Nam. The second phase was to identify, catalogue and evaluate catastrophe risk models that could quantify risk and provide a view of risk to support design and pricing of parametric disaster risk financing mechanisms. The third stage was to evaluate the usability of data sources and catastrophe models, and to develop index prototypes to outline how data and catastrophe models could be combined using local, regional and global data sources. Finally, the project identified priorities for investment to support the collection, analysis and evaluation of natural catastrophes in order to support disaster risk financing.
Humphries Choptiany, John Michael; Pelot, Ronald
2014-09-01
Multicriteria decision analysis (MCDA) has been applied to various energy problems to incorporate a variety of qualitative and quantitative criteria, usually spanning environmental, social, engineering, and economic fields. MCDA and associated methods such as life-cycle assessments and cost-benefit analysis can also include risk analysis to address uncertainties in criteria estimates. One technology now being assessed to help mitigate climate change is carbon capture and storage (CCS). CCS is a new process that captures CO2 emissions from fossil-fueled power plants and injects them into geological reservoirs for storage. It presents a unique challenge to decisionmakers (DMs) due to its technical complexity, range of environmental, social, and economic impacts, variety of stakeholders, and long time spans. The authors have developed a risk assessment model using a MCDA approach for CCS decisions such as selecting between CO2 storage locations and choosing among different mitigation actions for reducing risks. The model includes uncertainty measures for several factors, utility curve representations of all variables, Monte Carlo simulation, and sensitivity analysis. This article uses a CCS scenario example to demonstrate the development and application of the model based on data derived from published articles and publicly available sources. The model allows high-level DMs to better understand project risks and the tradeoffs inherent in modern, complex energy decisions. © 2014 Society for Risk Analysis.
Black, I; Seaton, R; Chackiath, S; Wagland, S T; Pollard, S J T; Longhurst, P J
2011-12-01
The identification of risk and its appropriate allocation to partners in project consortia is essential for minimizing overall project risks, ensuring timely delivery and maximizing benefit for money invested. Risk management guidance available from government bodies, especially in the UK, does not specify methodologies for quantitative risk assessment, nor does it offer a procedure for allocating risk among project partners. Here, a methodology to quantify project risk and potential approaches to allocating risk and their implications are discussed. Construction and operation of a waste management facility through a public-private finance contract are discussed. Public-private partnership contracts are special purpose vehicle (SPV) financing methods promoted by the UK government to boost private sector investment in facilities for public service enhancement. Our findings question the appropriateness of using standard deviation as a measure for project risk and confirm the concept of portfolio theory, suggesting the pooling of risk can reduce total risk and its impact.
NASA Astrophysics Data System (ADS)
Benkert, B.; Perrin, A.; Calmels, F.
2015-12-01
Together with its partners, the Northern Climate ExChange (NCE, part of the Yukon Research Centre at Yukon College) has been mapping permafrost-related hazard risk in northern communities since 2010. By integrating geoscience and climate project data, we have developed a series of community-scale hazard risk maps. The maps depict hazard risk in stoplight colours for easy interpretation, and support community-based, future-focused adaptation planning. Communities, First Nations, consultants and local regulatory agencies have used the hazard risk maps to site small-scale infrastructure projects, guide land planning processes, and assess suitability of land development applications. However, we know that assessing risk is only one step in integrating the implications of permafrost degradation in societal responses to environmental change. To build on our permafrost hazard risk maps, we are integrating economic principles and traditional land use elements. To assess economic implications of adaptation to permafrost change, we are working with geotechnical engineers to identify adaptation options (e.g., modified building techniques, permafrost thaw mitigation approaches) that suit the risks captured by our existing hazard risk maps. We layer this with an economic analysis of the costs associated with identified adaptation options, providing end-users with a more comprehensive basis upon which to make decisions related to infrastructure. NCE researchers have also integrated traditional land use activities in assessments of permafrost thaw risk, in a project led by Jean Marie River First Nation in the Northwest Territories. Here, the implications of permafrost degradation on food security and land use priorities were assessed by layering key game and gathering areas on permafrost thaw vulnerability maps. Results indicated that close to one quarter of big and small game habitats, and close to twenty percent of key furbearer and gathering areas within the First Nation's traditional territory, are situated on highly thaw sensitive permafrost. These projects demonstrate how physical and socio-economic factors can be integrated in assessments of permafrost vulnerability to thaw, thus providing tangible, useable results that reflect community priorities and support local decision making.
Georgia Species at Risk Project
2009-06-01
Robins, ten at Fort Stewart, and three at King’s Bay. GA-DNR contracted with the Natural Resources Spatial Analysis Laboratory (NARSAL) to produce...stagnant, tannin -stained waters in creeks and impoundments, especially in areas with heavy aquatic vegetation (Hoover et al. 1998). A management...was contracted to the Natural Resources Spatial Analysis Laboratory (NARSAL) at the University of Georgia, who previously completed mapping at a
Reducing Risk for the Next Generation Nuclear Plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
John M. Beck II; Harold J. Heydt; Emmanuel O. Opare
2010-07-01
The Next Generation Nuclear Plant (NGNP) Project, managed by the Idaho National Laboratory (INL), is directed by the Energy Policy Act of 2005, to research, develop, design, construct, and operate a prototype forth generation nuclear reactor to meet the needs of the 21st Century. As with all large projects developing and deploying new technologies, the NGNP has numerous risks that need to be identified, tracked, mitigated, and reduced in order for successful project completion. A Risk Management Plan (RMP) was created to outline the process the INL is using to manage the risks and reduction strategies for the NGNP Project.more » Integral to the RMP is the development and use of a Risk Management System (RMS). The RMS is a tool that supports management and monitoring of the project risks. The RMS does not only contain a risk register, but other functionality that allows decision makers, engineering staff, and technology researchers to review and monitor the risks as the project matures.« less
Hunt, Kelly J.; Kistner-Griffin, Emily; Spruill, Ida; Teklehaimanot, Abeba A.; Garvey, W. Timothy; Sale, Michèle; Fernandes, Jyotika
2014-01-01
Objectives To determine the prevalence of cardiovascular disease, levels of cardiovascular risk factors, and extent of preventive care in Gullah African Americans with a high familial risk of type 2 diabetes mellitus. Methods Between 1995 and 2003, 1321 Gullah African Americans with a high prevalence of diabetes mellitus from the South Carolina Sea Islands consented to and enrolled in the Sea Islands Genetic African American Registry (Project SuGAR). A cross-sectional analysis of cardiometabolic risk, preventive care, and self-reported cardiovascular disease was conducted. Results Cardiometabolic risk factor levels were high and vascular disease was prevalent. Among the subjects with diabetes mellitus, the mean disease duration was 10.5 years; approximately one-third reported reduced vision or blindness; and >80% reported numbness, pain, or burning in their feet. Preventive diabetes care was limited, with <60%, <25%, and <40% seeing an ophthalmologist, podiatrist, and dentist, respectively, within the past year. Only 54.4% of women and 39.3% of men reported daily glucose monitoring. Conclusions As the largest existing study of Gullah individuals, our study offers insight into not only the level of cardiovascular risk in this population but also the pathophysiological mechanisms central to ancestral differences in cardiometabolic risk in the broader African American population. PMID:25279862
Hunt, Kelly J; Kistner-Griffin, Emily; Spruill, Ida; Teklehaimanot, Abeba A; Garvey, W Timothy; Sale, Michèle; Fernandes, Jyotika
2014-10-01
To determine the prevalence of cardiovascular disease, levels of cardiovascular risk factors, and extent of preventive care in Gullah African Americans with a high familial risk of type 2 diabetes mellitus. Between 1995 and 2003, 1321 Gullah African Americans with a high prevalence of diabetes mellitus from the South Carolina Sea Islands consented to and enrolled in the Sea Islands Genetic African American Registry (Project SuGAR). A cross-sectional analysis of cardiometabolic risk, preventive care, and self-reported cardiovascular disease was conducted. Cardiometabolic risk factor levels were high and vascular disease was prevalent. Among the subjects with diabetes mellitus, the mean disease duration was 10.5 years; approximately one-third reported reduced vision or blindness; and >80% reported numbness, pain, or burning in their feet. Preventive diabetes care was limited, with <60%, <25%, and <40% seeing an ophthalmologist, podiatrist, and dentist, respectively, within the past year. Only 54.4% of women and 39.3% of men reported daily glucose monitoring. As the largest existing study of Gullah individuals, our study offers insight into not only the level of cardiovascular risk in this population but also the pathophysiological mechanisms central to ancestral differences in cardiometabolic risk in the broader African American population.
CONSULTATION ON UPDATED METHODOLOGY FOR ...
The National Academy of Sciences (NAS) expects to publish the Biological Effects of Ionizing Radiation (BEIR) committee's report (BEIR VII) on risks from ionizing radiation exposures in calendar year 2005. The committee is expected to have analyzed the most recent epidemiology from the important exposed cohorts and to have factored in any changes resulting from the updated analysis of dosimetry for the Japanese atomic bomb survivors. To the extent practical, the Committee will also consider any relevant radiobiological data, including those from the Department of Energy's low dose effects research program. Based on their evaluation of relevant information, the Committee is then expected to propose a set of models for estimating risks from low-dose ionizing radiation. ORIA will review the BEIR VII report and consider revisions to the Agency's methodology for estimating cancer risks from exposure to ionizing radiation in light of this report and other relevant information. This will be the subject of the Consultation. This project supports a major risk management initiative to improve the basis on which radiation risk decisions are made. This project, funded by several Federal Agencies, reflects an attempt to characterize risks where there are substantial uncertainties. The outcome will improve our ability to assess risks well into the future and will strengthen EPAs overall capability for assessing and managing radiation risks. the BEIR VII report is funde
Social amplification of risk in the Internet environment.
Chung, Ik Jae
2011-12-01
This article analyzes the dynamic process of risk amplification in the Internet environment with special emphasis on public concern for environmental risks from a high-speed railway tunnel construction project in South Korea. Environmental organizations and activists serving as social stations collected information about the project and its ecological impact, and communicated this with the general public, social groups, and institutions. The Internet provides social stations and the public with an efficient means for interactive communication and an open space for active information sharing and public participation. For example, while the website of an organization such as an environmental activist group can initially trigger local interest, the Internet allows this information to be disseminated to a much wider audience in a manner unavailable to the traditional media. Interaction among social stations demonstrates an amplifying process of public attention to the risk. Analyses of the volume of readers' comments to online newspaper articles and public opinions posted on message board of public and nonprofit organizations show the ripple effects of the amplification process as measured along temporal, geographical, and sectoral dimensions. Public attention is also influenced by the symbolic connotations of risk information. Interpretations of risk in religious, political, or legal terms intensify public concern for the environmental risk. © 2011 Society for Risk Analysis.
The CLUVA project: Climate-change scenarios and their impact on urban areas in Africa
NASA Astrophysics Data System (ADS)
Di Ruocco, Angela; Weets, Guy; Gasparini, Paolo; Jørgensen, Gertrud; Lindley, Sarah; Pauleit, Stephan; Vahed, Anwar; Schiano, Pasquale; Kabisch, Sigrun; Vedeld, Trond; Coly, Adrien; Tonye, Emmanuel; Touré, Hamidou; Kombe, Wilbard; Yeshitela, Kumelachew
2013-04-01
CLUVA (CLimate change and Urban Vulnerability in Africa; http://www.cluva.eu/) is a 3 years project, funded by the European Commission in 2010. Its main objective is the estimate of the impacts of climate changes in the next 40 years at urban scale in Africa. The mission of CLUVA is to develop methods and knowledge to assess risks cascading from climate-changes. It downscales IPCC climate projections to evaluate threats to selected African test cities; mainly floods, sea-level rise, droughts, heat waves and desertification. The project evaluates and links: social vulnerability; vulnerability of in-town ecosystems and urban-rural interfaces; vulnerability of urban built environment and lifelines; and related institutional and governance dimensions of adaptation. A multi-scale and multi-disciplinary quantitative, probabilistic, modelling is applied. CLUVA brings together climate experts, risk management experts, urban planners and social scientists with their African counterparts in an integrated research effort focusing on the improvement of the capacity of scientific institutions, local councils and civil society to cope with climate change. The CLUVA approach was set-up in the first year of the project and developed as follows: an ensemble of eight global projections of climate changes is produced for east and west Africa until 2050 considering the new IPCC (International Panel on Climate Changes; http://www.ipcc.ch/) scenarios. These are then downscaled to urban level, where territorial modeling is required to compute hazard effects on the vulnerable physical system (urban ecosystems, informal settlements, lifelines such as transportation and sewer networks) as well as on the social context, in defined time frames, and risk analysis is then employed to assess expected consequences. An investigation of the existing urban planning and governance systems and its interface with climate risks is performed. With the aid of the African partners, the developed approach is currently being applied to selected African case studies: Addis Ababa - Ethiopia; Dar es Salaam - Tanzania, Douala - Cameroun; Ouagadougou - Burkina Faso, St. Louis - Senegal. The poster will illustrate the CLUVA's framework to assess climate-change-related risks at an urban scale in Africa, and will report on the progresses of selected case studies to demonstrate feasibility of a multi-scale and multi-risk quantitative approach for risk management.
Pereira, T; Maldonado, J; Polónia, J; Silva, J A; Morais, J; Rodrigues, T; Marques, M
2014-04-01
HeartSCORE is a tool for assessing cardiovascular risk, basing its estimates on the relative weight of conventional cardiovascular risk factors. However, new markers of cardiovascular risk have been identified, such as aortic pulse wave velocity (PWV). The purpose of this study was to evaluate to what extent the incorporation of PWV in HeartSCORE increases its discriminative power of major cardiovascular events (MACE). This study is a sub-analysis of the EDIVA project, which is a prospective cohort, multicenter and observational study involving 2200 individuals of Portuguese nationality (1290 men and 910 women) aged between 18 and 91 years (mean 46.33 ± 13.76 years), with annual measurements of PWV (Complior). Only participants above 35 years old were included in the present re-analysis, resulting in a population of 1709 participants. All MACE - death, cerebrovascular accident, coronary accidents (coronary heart disease), peripheral arterial disease and renal failure - were recorded. During a mean follow-up period of 21.42 ± 10.76 months, there were 47 non-fatal MACE (2.1% of the sample). Cardiovascular risk was estimated in all patients based on the HeartSCORE risk factors. For the analysis, the refitted HeartSCORE and PWV were divided into three risk categories. The event-free survival at 2 years was 98.6%, 98.0% and 96.1%, respectively in the low-, intermediate- and high-risk categories of HeartSCORE (log-rank p < 0.001). The multi-adjusted hazard ratio (HR) per 1 - standard deviation (SD) of MACE was 1.86 (95% CI 1.37-2.53, p < 0.001) for PWV. The risk of MACE by tertiles of PWV and risk categories of the HeartSCORE increased linearly, and the risk was particularly more pronounced in the highest tertile of PWV for any category of the HeartSCORE, demonstrating an improvement in the prediction of cardiovascular risk. It was clearly depicted a high discriminative capacity of PWV even in groups of apparent intermediate cardiovascular risk. Measures of model fit, discrimination and calibration revealed an improvement in risk classification when PWV was added to the risk-factor model. The C statistics improved from 0.69 to 0.78 (adding PWV, p = 0.005). The net reclassification improvement (NRI) and integrated discrimination improvement (IDI) were also determined, and indicated further evidence of improvements in discrimination of the outcome when including PWV in the risk-factor model (NRI = 0.265; IDI = 0.012). The results clearly illustrate the benefits of integrating PWV in the risk assessment strategies, as advocated by HeartSCORE, insofar as it contributes to a better discriminative capacity of global cardiovascular risk, particularly in individuals with low or moderate cardiovascular risk.
Uncertainty Analysis in Space Radiation Protection
NASA Technical Reports Server (NTRS)
Cucinotta, Francis A.
2011-01-01
Space radiation is comprised of high energy and charge (HZE) nuclei, protons, and secondary radiation including neutrons. The uncertainties in estimating the health risks from galactic cosmic rays (GCR) are a major limitation to the length of space missions, the evaluation of potential risk mitigation approaches, and application of the As Low As Reasonably Achievable (ALARA) principle. For long duration space missio ns, risks may approach radiation exposure limits, therefore the uncertainties in risk projections become a major safety concern and methodologies used for ground-based works are not deemed to be sufficient. NASA limits astronaut exposures to a 3% risk of exposure induced death (REID) and protects against uncertainties in risks projections using an assessment of 95% confidence intervals in the projection model. We discuss NASA s approach to space radiation uncertainty assessments and applications for the International Space Station (ISS) program and design studies of future missions to Mars and other destinations. Several features of NASA s approach will be discussed. Radiation quality descriptions are based on the properties of radiation tracks rather than LET with probability distribution functions (PDF) for uncertainties derived from radiobiology experiments at particle accelerators. The application of age and gender specific models for individual astronauts is described. Because more than 90% of astronauts are never-smokers, an alternative risk calculation for never-smokers is used and will be compared to estimates for an average U.S. population. Because of the high energies of the GCR limits the benefits of shielding and the limited role expected for pharmaceutical countermeasures, uncertainty reduction continues to be the optimal approach to improve radiation safety for space missions.
NASA Astrophysics Data System (ADS)
Dindar, Serdar; Kaewunruen, Sakdirat; Osman, Mohd H.
2017-10-01
One of the emerging significant advances in engineering, satellite imaging (SI) is becoming very common in any kind of civil engineering projects e.g., bridge, canal, dam, earthworks, power plant, water works etc., to provide an accurate, economical and expeditious means of acquiring a rapid assessment. Satellite imaging services in general utilise combinations of high quality satellite imagery, image processing and interpretation to obtain specific required information, e.g. surface movement analysis. To extract, manipulate and provide such a precise knowledge, several systems, including geographic information systems (GIS) and global positioning system (GPS), are generally used for orthorectification. Although such systems are useful for mitigating risk from projects, their productiveness is arguable and operational risk after application is open to discussion. As the applicability of any novel application to the railway industry is often measured in terms of whether or not it has gained in-depth knowledge and to what degree, as a result of errors during its operation, this novel application generates risk in ongoing projects. This study reviews what can be achievable for risk management of railway turnouts thorough satellite imaging. The methodology is established on the basis of other published articles in this area and the results of applications to understand how applicable such imagining process is on railway turnouts, and how sub-systems in turnouts can be effectively traced/operated with less risk than at present. As a result of this review study, it is aimed that the railway sector better understands risk mitigation in particular applications.
NASA Astrophysics Data System (ADS)
Cuellar, A. D.; McKinney, D. C.
2014-12-01
Climate change has accelerated glacial retreat in high altitude glaciated regions of Peru leading to the growth and formation of glacier lakes. Glacial lake outburst floods (GLOF) are sudden events triggered by an earthquake, avalanche into the lake or other shock that causes a sudden outflow of water. These floods are catastrophic because of their sudden onset, the difficulty predicting them, and enormous quantity of water and debris rapidly flooding downstream areas. Palcacocha Lake in the Peruvian Andes has experienced accelerated growth since it burst in 1941 and threatens the major city of Huaraz and surrounding communities. Since the 1941 flood stakeholders have advocated for projects to adapt to the increasing threat posed by Palcacocha Lake. Nonetheless, discussions surrounding projects for Palcacocha have not included a rigorous analysis of the potential consequences of a flood, probability of an event, or costs of mitigation projects. This work presents the first step to rationally analyze the risks posed by Palcacocha Lake and the various adaptation projects proposed. In this work the authors use decision analysis to asses proposed adaptation measures that would mitigate damage in downstream communities from a GLOF. We use an existing hydrodynamic model of the at-risk area to determine how adaptation projects will affect downstream flooding. Flood characteristics are used in the HEC-FIA software to estimate fatalities and injuries from an outburst flood, which we convert to monetary units using the value of a statistical life. We combine the monetary consequences of a GLOF with the cost of the proposed projects and a diffuse probability distribution for the likelihood of an event to estimate the expected cost of the adaptation plans. From this analysis we found that lowering the lake level by 15 meters has the least expected cost of any proposal despite uncertainty in the effect of lake lowering on flooding downstream.
Assessing and Mitigating Hurricane Storm Surge Risk in a Changing Environment
NASA Astrophysics Data System (ADS)
Lin, N.; Shullman, E.; Xian, S.; Feng, K.
2017-12-01
Hurricanes have induced devastating storm surge flooding worldwide. The impacts of these storms may worsen in the coming decades because of rapid coastal development coupled with sea-level rise and possibly increasing storm activity due to climate change. Major advances in coastal flood risk management are urgently needed. We present an integrated dynamic risk analysis for flooding task (iDraft) framework to assess and manage coastal flood risk at the city or regional scale, considering integrated dynamic effects of storm climatology change, sea-level rise, and coastal development. We apply the framework to New York City. First, we combine climate-model projected storm surge climatology and sea-level rise with engineering- and social/economic-model projected coastal exposure and vulnerability to estimate the flood damage risk for the city over the 21st century. We derive temporally-varying risk measures such as the annual expected damage as well as temporally-integrated measures such as the present value of future losses. We also examine the individual and joint contributions to the changing risk of the three dynamic factors (i.e., sea-level rise, storm change, and coastal development). Then, we perform probabilistic cost-benefit analysis for various coastal flood risk mitigation strategies for the city. Specifically, we evaluate previously proposed mitigation measures, including elevating houses on the floodplain and constructing flood barriers at the coast, by comparing their estimated cost and probability distribution of the benefit (i.e., present value of avoided future losses). We also propose new design strategies, including optimal design (e.g., optimal house elevation) and adaptive design (e.g., flood protection levels that are designed to be modified over time in a dynamic and uncertain environment).
Climate change and the effects of dengue upon Australia: An analysis of health impacts and costs
NASA Astrophysics Data System (ADS)
Newth, D.; Gunasekera, D.
2010-08-01
Projected regional warming and climate change analysis and health impact studies suggest that Australia is potentially vulnerable to increased occurrence of vector borne diseases such as dengue fever. Expansion of the dengue fever host, Aedes aegypti could potentially pose a significant public health risk. To manage such health risks, there is a growing need to focus on adaptive risk management strategies. In this paper, we combine analyses from climate, biophysical and economic models with a high resolution population model for disease spread, the EpiCast model to analyse the health impacts and costs of spread of dengue fever. We demonstrate the applicability of EpiCast as a decision support tool to evaluate mitigation strategies to manage the public health risks associated with shifts in the distribution of dengue fever in Australia.
Riley, Emily; Harris, Patrick; Kent, Jennifer; Sainsbury, Peter; Lane, Anna; Baum, Fran
2018-05-10
Transport policy and practice impacts health. Environmental Impact Assessments (EIAs) are regulated public policy mechanisms that can be used to consider the health impacts of major transport projects before they are approved. The way health is considered in these environmental assessments (EAs) is not well known. This research asked: How and to what extent was human health considered in EAs of four major transport projects in Australia. We developed a comprehensive coding framework to analyse the Environmental Impact Statements (EISs) of four transport infrastructure projects: three road and one light rail. The coding framework was designed to capture how health was directly and indirectly included. We found that health was partially considered in all four EISs. In the three New South Wales (NSW) projects, but not the one South Australian project, this was influenced by the requirements issued to proponents by the government which directed the content of the EIS. Health was assessed using human health risk assessment (HHRA). We found this to be narrow in focus and revealed a need for a broader social determinants of health approach, using multiple methods. The road assessments emphasised air quality and noise risks, concluding these were minimal or predicted to improve. The South Australian project was the only road project not to include health data explicitly. The light rail EIS considered the health benefits of the project whereas the others focused on risk. Only one project considered mental health, although in less detail than air quality or noise. Our findings suggest EIAs lag behind the known evidence linking transport infrastructure to health. If health is to be comprehensively included, a more complete model of health is required, as well as a shift away from health risk assessment as the main method used. This needs to be mandatory for all significant developments. We also found that considering health only at the EIA stage may be a significant limitation, and there is a need for health issues to be considered when earlier, fundamental decisions about the project are being made. © 2018 The Author(s); Published by Kerman University of Medical Sciences. This is an open-access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Correlation Analysis of Freeway Traffic Status and Crashes with Nevada Data.
DOT National Transportation Integrated Search
2017-11-11
This project is to study the correlation between freeway traffic status and crash risks with the historical freeway ITS data and related crash data in Nevada. With the comprehensive review of previous research results, the Center for Advanced Transpo...
Manuel, Douglas G.; Tuna, Meltem; Hennessy, Deirdre; Okhmatovskaia, Anya; Finès, Philippe; Tanuseputro, Peter; Tu, Jack V.; Flanagan, William
2014-01-01
Background Reductions in preventable risks associated with cardiovascular disease have contributed to a steady decrease in its incidence over the past 50 years in most developed countries. However, it is unclear whether this trend will continue. Our objective was to examine future risk by projecting trends in preventable risk factors in Canada to 2021. Methods We created a population-based microsimulation model using national data on births, deaths and migration; socioeconomic data; cardiovascular disease risk factors; and algorithms for changes in these risk factors (based on sociodemographic characteristics and previous cardiovascular disease risk). An initial population of 22.5 million people, representing the Canadian adult population in 2001, had 13 characteristics including the risk factors used in clinical risk prediction. There were 6.1 million potential exposure profiles for each person each year. Outcome measures included annual prevalence of risk factors (smoking, obesity, diabetes, hypertension and lipid levels) and of co-occurring risks. Results From 2003 to 2009, the projected risks of cardiovascular disease based on the microsimulation model closely approximated those based on national surveys. Except for obesity and diabetes, all risk factors were projected to decrease through to 2021. The largest projected decreases were for the prevalence of smoking (from 25.7% in 2001 to 17.7% in 2021) and uncontrolled hypertension (from 16.1% to 10.8%). Between 2015 and 2017, obesity was projected to surpass smoking as the most prevalent risk factor. Interpretation Risks of cardiovascular disease are projected to decrease modestly in Canada, leading to a likely continuing decline in its incidence. PMID:25077135
NASA Technical Reports Server (NTRS)
Kapoor, Manju M.; Mehta, Manju
2010-01-01
The goal of this paper is to emphasize the importance of developing complete and unambiguous requirements early in the project cycle (prior to Preliminary Design Phase). Having a complete set of requirements early in the project cycle allows sufficient time to generate a traceability matrix. Requirements traceability and analysis are the key elements in improving verification and validation process, and thus overall software quality. Traceability can be most beneficial when the system changes. If changes are made to high-level requirements it implies that low-level requirements need to be modified. Traceability ensures that requirements are appropriately and efficiently verified at various levels whereas analysis ensures that a rightly interpreted set of requirements is produced.
Towards a systems approach to risk considerations for concurrent design
NASA Technical Reports Server (NTRS)
Meshkat, Leila; Oberto, Robert E.
2004-01-01
This paper describes the new process used by the Project Design Center at NASA's Jet Propulsion Laboratory for the identification, assessment and communication of risk elements throughout the lifecycle of a mission design. This process includes a software tool, 'RAP' that collects and communicates risk information between the various designers and a 'risk expert' who mediates this process. The establishment of this process is an attempt towards the systematic consideration of risk in the design decision making process. Using this process, we are able to better keep track of the risks associated with the design decisions. Furthermore, it helps us develop better risk profiles for the studies under consideration. We aim to refine and expand the current process to enable more thorough risk analysis capabilities in the future.
Climate Risk Assessment: Technical Guidance Manual for DoD Installations and Built Environment
2016-09-06
climate change risks to DoD installations and the built environment. The approach, which we call “decision-scaling,” reveals the core sensitivity of...DoD installations to climate change . It is designed to illuminate the sensitivity of installations and their supporting infrastructure systems...including water and energy, to climate changes and other uncertainties without dependence on climate change projections. In this way the analysis and
Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat
2013-09-01
The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.
Methodology Development for Assessment of Spaceport Technology Returns and Risks
NASA Technical Reports Server (NTRS)
Joglekar, Prafulla; Zapata, Edgar
2001-01-01
As part of Kennedy Space Center's (KSC's) challenge to open the space frontier, new spaceport technologies must be developed, matured and successfully transitioned to operational systems. R&D investment decisions can be considered from multiple perspectives. Near mid and far term technology horizons must be understood. Because a multitude of technology investment opportunities are available, we must identify choices that promise the greatest likelihood of significant lifecycle At the same time, the costs and risks of any choice must be well understood and balanced against its potential returns The problem is not one of simply rank- ordering projects in terms of their desirability. KSC wants to determine a portfolio of projects that simultaneously satisfies multiple goals, such as getting the biggest bang for the buck, supporting projects that may be too risky for private funding, staying within annual budget cycles without foregoing the requirements of a long term technology vision, and ensuring the development of a diversity of technologies that, support the variety of operational functions involved in space transportation. This work aims to assist in the development of in methods and techniques that support strategic technology investment decisions and ease the process of determining an optimal portfolio of spaceport R&D investments. Available literature on risks and returns to R&D is reviewed and most useful pieces are brought to the attention of the Spaceport Technology Development Office (STDO). KSC's current project management procedures are reviewed. It is found that the "one size fits all" nature of KSC's existing procedures and project selection criteria is not conducive to prudent decision-making. Directions for improving KSC's - procedures and criteria are outlined. With help of a contractor, STDO is currently developing a tool, named Change Management Analysis Tool (CMAT)/ Portfolio Analysis Tool (PAT), to assist KSC's R&D portfolio determination. A critical review of CMAT/PAT is undertaken. Directions for the improvement of this tool are provided. STDO and KSC intend to follow up on many, if not all, of the recommendations provided.
A methodology for the evaluation of program cost and schedule risk for the SEASAT program
NASA Technical Reports Server (NTRS)
Abram, P.; Myers, D.
1976-01-01
An interactive computerized project management software package (RISKNET) is designed to analyze the effect of the risk involved in each specific activity on the results of the total SEASAT-A program. Both the time and the cost of each distinct activity can be modeled with an uncertainty interval so as to provide the project manager with not only the expected time and cost for the completion of the total program, but also with the expected range of costs corresponding to any desired level of significance. The nature of the SEASAT-A program is described. The capabilities of RISKNET and the implementation plan of a RISKNET analysis for the development of SEASAT-A are presented.
NASA Astrophysics Data System (ADS)
Buongiorno, Maria Fabrizia; Musacchio, Massimo; Silvestri, Malvina; Spinetti, Claudia; Corradini, Stefano; Lombardo, Valerio; Merucci, Luca; Sansosti, Eugenio; Pugnagli, Sergio; Teggi, Sergio; Pace, Gaetano; Fermi, Marco; Zoffoli, Simona
2007-10-01
The Project called Sistema Rischio Vulcanico (SRV) is funded by the Italian Space Agency (ASI) in the frame of the National Space Plan 2003-2005 under the Earth Observations section for natural risks management. The SRV Project is coordinated by the Istituto Nazionale di Geofisica e Vulcanologia (INGV) which is responsible at national level for the volcanic monitoring. The objective of the project is to develop a pre-operative system based on EO data and ground measurements integration to support the volcanic risk monitoring of the Italian Civil Protection Department which requirements and need are well integrated in the GMES Emergency Core Services program. The project philosophy is to implement, by incremental versions, specific modules which allow to process, store and visualize through Web GIS tools EO derived parameters considering three activity phases: 1) knowledge and prevention; 2) crisis; 3) post crisis. In order to combine effectively the EO data and the ground networks measurements the system will implement a multi-parametric analysis tool, which represents and unique tool to analyze contemporaneously a large data set of data in "near real time". The SRV project will be tested his operational capabilities on three Italian Volcanoes: Etna,Vesuvio and Campi Flegrei.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Domínguez-Gómez, J. Andrés, E-mail: andres@uhu.es
In the last twenty years, both the increase in academic production and the expansion of professional involvement in Environmental Impact Assessment (EIA) and Social Impact Assessment (SIA) have evidenced growing scientific and business interest in risk and impact analysis. However, this growth has not brought with it parallel progress in addressing the main shortcomings of EIA/SIA, i.e. insufficient integration of environmental and social factors into development project analyses and, in cases where the social aspects are considered, technical-methodological failings in their analysis and assessment. It is clear that these weaknesses carry with them substantial threats to the sustainability (social, environmentalmore » and economic) of projects which impact on the environment, and consequently to the local contexts where they are carried out and to the delicate balance of the global ecosystem. This paper argues that, in a sociological context of complexity and dynamism, four conceptual elements should underpin approaches to socio-environmental risk and impact assessment in development projects: a theoretical base in actor–network theory; an ethical grounding in values which are internationally recognized (though not always fulfilled in practice); a (new) epistemological-scientific base; and a methodological foundation in social participation. - Highlights: • A theoretical foundation in actor–network theory • An ethical grounding in values which are internationally recognized, but rarely carried through into practice • A (new) epistemological-scientific base • A methodological foundation in social participation.« less
Risk factors for reinsertion of urinary catheter after early removal in thoracic surgical patients.
Young, John; Geraci, Travis; Milman, Steven; Maslow, Andrew; Jones, Richard N; Ng, Thomas
2018-03-08
To reduce the incidence of urinary tract infection, Surgical Care Improvement Project 9 mandates the removal of urinary catheters within 48 hours postoperatively. In patients with thoracic epidural anesthesia, we sought to determine the rate of catheter reinsertion, the complications of reinsertion, and the factors associated with reinsertion. We conducted a prospective observational study of consecutive patients undergoing major pulmonary or esophageal resection with thoracic epidural analgesia over a 2-year period. As per Surgical Care Improvement Project 9, all urinary catheters were removed within 48 hours postoperatively. Excluded were patients with chronic indwelling catheter, patients with urostomy, and patients requiring continued strict urine output monitoring. Multivariable logistic regression analysis was used to identify independent risk factors for urinary catheter reinsertion. Thirteen patients met exclusion criteria. Of the 275 patients evaluated, 60 (21.8%) required reinsertion of urinary catheter. There was no difference in the urinary tract infection rate between patients requiring reinsertion (1/60 [1.7%]) versus patients not requiring reinsertion (1/215 [0.5%], P = .389). Urethral trauma during reinsertion was seen in 1 of 60 patients (1.7%). After reinsertion, discharge with urinary catheter was required in 4 of 60 patients (6.7%). Multivariable logistic regression analysis found esophagectomy, lower body mass index, and benign prostatic hypertrophy to be independent risk factors associated with catheter reinsertion after early removal in the presence of thoracic epidural analgesia. When applying Surgical Care Improvement Project 9 to patients undergoing thoracic procedures with thoracic epidural analgesia, consideration to delayed removal of urinary catheter may be warranted in patients with multiple risk factors for reinsertion. Copyright © 2018 The American Association for Thoracic Surgery. Published by Elsevier Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
Brothers, Mary Ann; Safie, Fayssal M. (Technical Monitor)
2002-01-01
NASA at Marshall Space Flight Center (MSFC) and the U.S. Army at Redstone Arsenal were analyzed to determine whether they were successful in implementing their risk management program. Risk management implementation surveys were distributed to aid in this analysis. The scope is limited to NASA S&MA (Safety and Mission Assurance) at MSFC, including applicable support contractors, and the US Army Engineering Directorate, including applicable contractors, located at Redstone Arsenal. NASA has moderately higher risk management implementation survey scores than the Army. Accordingly, the implementation of the risk management program at NASA is considered good while only two of five of the survey categories indicated that the risk management implementation is good at the Army.
Fung, Ivan W H; Lo, Tommy Y; Tung, Karen C F
2012-09-01
Since the safety professionals are the key decision makers dealing with project safety and risk assessment in the construction industry, their perceptions of safety risk would directly affect the reliability of risk assessment. The safety professionals generally tend to heavily rely on their own past experiences to make subjective decisions on risk assessment without systematic decision making. Indeed, understanding of the underlying principles of risk assessment is significant. In this study, the qualitative analysis on the safety professionals' beliefs of risk assessment and their perceptions towards risk assessment, including their recognitions of possible accident causes, the degree of differentiations on their perceptions of risk levels of different trades of works, recognitions of the occurrence of different types of accidents, and their inter-relationships with safety performance in terms of accident rates will be explored in the Stage 1. At the second stage, the deficiencies of the current general practice for risk assessment can be sorted out firstly. Based on the findings from Stage 1 and the historical accident data from 15 large-scaled construction projects in 3-year average, a risk evaluation model prioritizing the risk levels of different trades of works and which cause different types of site accident due to various accident causes will be developed quantitatively. With the suggested systematic accident recording techniques, this model can be implemented in the construction industry at both project level and organizational level. The model (Q(2)REM) not only act as a useful supplementary guideline of risk assessment for the construction safety professionals, but also assists them to pinpoint the potential risks on site for the construction workers under respective trades of works through safety trainings and education. It, in turn, arouses their awareness on safety risk. As the Q(2)REM can clearly show the potential accident causes leading to different types of accident by trade of works, it helps the concerned safety professionals and parties to plan effective accident prevention measures with reference to the priority of the risk levels. Copyright © 2011 Elsevier Ltd. All rights reserved.
Tools and Methods for Risk Management in Multi-Site Engineering Projects
NASA Astrophysics Data System (ADS)
Zhou, Mingwei; Nemes, Laszlo; Reidsema, Carl; Ahmed, Ammar; Kayis, Berman
In today's highly global business environment, engineering and manufacturing projects often involve two or more geographically dispersed units or departments, research centers or companies. This paper attempts to identify the requirements for risk management in a multi-site engineering project environment, and presents a review of the state-of-the-art tools and methods that can be used to manage risks in multi-site engineering projects. This leads to the development of a risk management roadmap, which will underpin the design and implementation of an intelligent risk mapping system.
Yu, Shih-Heng; Chang, Dong-Shang
2014-01-01
This study investigates the risk factors in railway reconstruction project through complete literature reviews on construction project risks and scrutinizing experiences and challenges of railway reconstructions in Taiwan. Based on the identified risk factors, an assessing framework based on the fuzzy multicriteria decision-making (fuzzy MCDM) approach to help construction agencies build awareness of the critical risk factors on the execution of railway reconstruction project, measure the impact and occurrence likelihood for these risk factors. Subjectivity, uncertainty and vagueness within the assessment process are dealt with using linguistic variables parameterized by trapezoid fuzzy numbers. By multiplying the degree of impact and the occurrence likelihood of risk factors, estimated severity values of each identified risk factor are determined. Based on the assessment results, the construction agencies were informed of what risks should be noticed and what they should do to avoid the risks. That is, it enables construction agencies of railway reconstruction to plan the appropriate risk responses/strategies to increase the opportunity of project success and effectiveness. PMID:24772014
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lottes, S.A.; Kulak, R.F.; Bojanowski, C.
2011-12-09
The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. Themore » analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water effects on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to assess them for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, CFD analysis of the operation of the wind tunnel in the TFCHR wind engineering laboratory, vehicle stability under high wind loading, and the use of electromagnetic shock absorbers to improve vehicle stability under high wind conditions. This quarterly report documents technical progress on the project tasks for the period of July through September 2011.« less
Martin-Fernandez, Laura; Ziyatdinov, Andrey; Carrasco, Marina; Millon, Juan Antonio; Martinez-Perez, Angel; Vilalta, Noelia; Brunel, Helena; Font, Montserrat; Hamsten, Anders; Souto, Juan Carlos; Soria, José Manuel
2016-01-01
Background Venous thromboembolism (VTE) is a common disease where known genetic risk factors explain only a small portion of the genetic variance. Then, the analysis of intermediate phenotypes, such as thrombin generation assay, can be used to identify novel genetic risk factors that contribute to VTE. Objectives To investigate the genetic basis of distinct quantitative phenotypes of thrombin generation and its relationship to the risk of VTE. Patients/Methods Lag time, thrombin peak and endogenous thrombin potential (ETP) were measured in the families of the Genetic Analysis of Idiopathic Thrombophilia 2 (GAIT-2) Project. This sample consisted of 935 individuals in 35 extended families selected through a proband with idiopathic thrombophilia. We performed also genome wide association studies (GWAS) with thrombin generation phenotypes. Results The results showed that 67% of the variation in the risk of VTE is attributable to genetic factors. The heritabilities of lag time, thrombin peak and ETP were 49%, 54% and 52%, respectively. More importantly, we demonstrated also the existence of positive genetic correlations between thrombin peak or ETP and the risk of VTE. Moreover, the major genetic determinant of thrombin generation was the F2 gene. However, other suggestive signals were observed. Conclusions The thrombin generation phenotypes are strongly genetically determined. The thrombin peak and ETP are significantly genetically correlated with the risk of VTE. In addition, F2 was identified as a major determinant of thrombin generation. We reported suggestive signals that might increase our knowledge to explain the variability of this important phenotype. Validation and functional studies are required to confirm GWAS results. PMID:26784699
DOE Office of Scientific and Technical Information (OSTI.GOV)
Waldhoff, Stephanie T.; Martinich, Jeremy; Sarofim, Marcus
2015-07-01
The Climate Change Impacts and Risk Analysis (CIRA) modeling exercise is a unique contribution to the scientific literature on climate change impacts, economic damages, and risk analysis that brings together multiple, national-scale models of impacts and damages in an integrated and consistent fashion to estimate climate change impacts, damages, and the benefits of greenhouse gas (GHG) mitigation actions in the United States. The CIRA project uses three consistent socioeconomic, emissions, and climate scenarios across all models to estimate the benefits of GHG mitigation policies: a Business As Usual (BAU) and two policy scenarios with radiative forcing (RF) stabilization targets ofmore » 4.5 W/m2 and 3.7 W/m2 in 2100. CIRA was also designed to specifically examine the sensitivity of results to uncertainties around climate sensitivity and differences in model structure. The goals of CIRA project are to 1) build a multi-model framework to produce estimates of multiple risks and impacts in the U.S., 2) determine to what degree risks and damages across sectors may be lowered from a BAU to policy scenarios, 3) evaluate key sources of uncertainty along the causal chain, and 4) provide information for multiple audiences and clearly communicate the risks and damages of climate change and the potential benefits of mitigation. This paper describes the motivations, goals, and design of the CIRA modeling exercise and introduces the subsequent papers in this special issue.« less
ERIC Educational Resources Information Center
Grantham, Susan; Vieira, Edward T., Jr.
2014-01-01
This project examined the focus of environmental news frames used in seven American newspapers between 1970 and 2010. During this time newspapers were a primary source of news. Based on gatekeeping and agenda-setting theory, as well as source credibility, the content analysis of 2,123 articles examined the environmental topics within the articles,…
Development of a security vulnerability assessment process for the RAMCAP chemical sector.
Moore, David A; Fuller, Brad; Hazzan, Michael; Jones, J William
2007-04-11
The Department of Homeland Security (DHS), Directorate of Information Analysis & Infrastructure Protection (IAIP), Protective Services Division (PSD), contracted the American Society of Mechanical Engineers Innovative Technologies Institute, LLC (ASME ITI, LLC) to develop guidance on Risk Analysis and Management for Critical Asset Protection (RAMCAP). AcuTech Consulting Group (AcuTech) has been contracted by ASME ITI, LLC, to provide assistance by facilitating the development of sector-specific guidance on vulnerability analysis and management for critical asset protection for the chemical manufacturing, petroleum refining, and liquefied natural gas (LNG) sectors. This activity involves two key tasks for these three sectors: Development of a screening to supplement DHS understanding of the assets that are important to protect against terrorist attack and to prioritize the activities. Development of a standard security vulnerability analysis (SVA) framework for the analysis of consequences, vulnerabilities, and threats. This project involves the cooperative effort of numerous leading industrial companies, industry trade associations, professional societies, and security and safety consultants representative of those sectors. Since RAMCAP is a voluntary program for ongoing risk management for homeland security, sector coordinating councils are being asked to assist in communicating the goals of the program and in encouraging participation. The RAMCAP project will have a profound and positive impact on all sectors as it is fully developed, rolled-out and implemented. It will help define the facilities and operations of national and regional interest for the threat of terrorism, define standardized methods for analyzing consequences, vulnerabilities, and threats, and describe best security practices of the industry. This paper will describe the results of the security vulnerability analysis process that was developed and field tested for the chemical manufacturing sector. This method was developed through the cooperation of the many organizations and the individuals involved from the chemical sector RAMCAP development activities. The RAMCAP SVA method is intended to provide a common basis for making vulnerability assessments and risk-based decisions for homeland security. Mr. Moore serves as the coordinator for the chemical manufacturing, petroleum refining, and LNG sectors for the RAMCAP project and Dr. Jones is the chief technology officer for ASME-ITI, LLC for RAMCAP.
Earthquake supersite project in the Messina Straits area (EQUAMES)
NASA Astrophysics Data System (ADS)
Mattia, Mario; Chiarabba, Claudio; Dell'Acqua, Fabio; Faccenna, Claudio; Lanari, Riccardo; Matteuzzi, Francesco; Neri, Giancarlo; Patanè, Domenico; Polonia, Alina; Prati, Claudio; Tinti, Stefano; Zerbini, Susanna
2015-04-01
A new permanent supersite is going to be proposed to the GEO GSNL (Geohazard Supersites and National Laboratories) for the Messina Straits area (Italy). The justification for this new supersite can be found in its geological and geophysical features and in the exposure to strong earthquakes, also in the recent past (1908). The Messina Supersite infrastructure (EQUAMES: EarthQUAkes in the MEssina Straits) will host, and contribute to the collection of, large amounts of data, basic for the analysis of seismic hazard/risk in this high seismic risk area, including risk from earthquake-related processes such as submarine mass failures and tsunamis. In EQUAMES, data of different types will coexist with models and methods useful for their analysis/interpretation and with first-level products of analysis that can be of interest for different kinds of users. EQUAMES will help all the interested scientific and non-scientific subjects to find and use data and to increase inter-institutional cooperation by addressing the following main topics in the Messina Straits area: • investigation of the geological and physical processes leading to the earthquake preparation and generation; • analysis of seismic shaking at ground (expected and observed); • combination of seismic hazard with vulnerability and exposure data for risk estimates; • analysis of tsunami generation, propagation and coastal inundation deriving from earthquake occurrence also through landslides due to instability conditions of subaerial and submarine slopes; • overall risk associated to earthquake activity in the Supersite area including the different types of cascade effects Many Italian and international Institutions have shown an effective interest in this project where a large variety of geophysical and geological in-situ data will be collected and where the INGV has the leading role with its large infrastructure of seismic, GPS and geochemical permanent stations. The groups supporting EQUAMES compile different expertises which will allow most up-to-date analysis and interpretation of the data to be acquired. Finally, the availability of SAR data from different satellites (ERS, Cosmo SkyMed, Sentinel) can be the key for important improvements in the knowledge of the geodynamics of this area of the Mediterranean Sea.
Financing Projects That Use Clean Energy Technologies: An Overview of Barriers and Opportunities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goldman, D. P.; McKenna, J. J.; Murphy, L. M.
2005-10-01
Project finance is asset-based financing, meaning that the project lenders have recourse only to the underlying assets of a project. It involves both debt and equity, where the debt-to-equity ratio is typically large (e.g., 70% debt to 30% equity). Debt is used when available and when it is the least expensive form of financing, with equity still needed for credit worthiness. Most important, revenue from the project must be able to generate a return to the equity investors, and pay for interest and principal on the debt, transaction costs associated with developing and structuring the project, and operations and maintenancemore » costs. Successful project financing must provide a structure to manage and share risks in an optimal way that benefits all participants, allocating risks to those entities that are able to mitigate each specific risk, and to share information about putting risk management in the proper hands at the proper stage of project development. Contractual agreements are, thus, important in risk mitigation. Today's project financing typically involves the creation of a stand-alone project company that is the legal owner of the project assets, and that has contractual agreements with other parties.« less
NASA Astrophysics Data System (ADS)
Bergman, Ramona; Andersson-Sköld, Yvonne; Nyberg, Lars; Johansson, Magnus
2010-05-01
In a project funded by the Swedish Civil Contingencies Agency, the effort and work to reduce different kinds of accidents are being evaluated. The project wants to illuminate the links between actions and outcome, so we can learn from today's performance and in the future select more effective measures and overall deal with accidents more efficiently. The project ESS covers the field of frequent accidents such as sliding accidents at home, in house fires and less common accidents such as chemical and land fill accidents up to even more rare accidents such as natural accidents and hazards. In the ESS project SGI (Swedish geotechnical institute) will evaluate the work and effort concerning various natural hazards limited to landslides, erosion and flooding. The aim is to investigate how municipalities handle, especially prevention, of such natural disasters today. The project includes several aspects such as: • which are the driving forces for risk analysis in a municipality • do one use risk mapping (and what type) in municipal risk analysis • which aspects are most important when selecting preventive measures • in which way do one learn from past accidents • and from previous accidents elsewhere, by for example use existing databases • etc There are many aspects that play a role in a well-functioning safety promotion work. The overall goal is to examine present work and activities, highlight what is well functioning and identify weak points. The aim is to find out where more resources are needed and give suggestions for a more efficient security work. This includes identification of the most efficient "tools" in use or needed. Such tools can be education, directives, funding, more easily available maps and information regarding previous accidents and preventive measures etc. The project will result in recommendations for more effective ways to deal with landslides, erosion and flooding. Since different kinds of problems can occur depending on level of authority the investigation of the security work will be done with authorities on both regional and local scale. At the moment the investigation process are in progress and preliminary results will be presented.
Nelson, Victoria; Nelson, Victoria Ruth; Li, Fiona; Green, Susan; Tamura, Tomoyoshi; Liu, Jun-Min; Class, Margaret
2008-11-06
The Walter Reed National Surgical Quality Improvement Program Data Transfer web module integrates with medical and surgical information systems, and leverages outside standards, such as the National Library of Medicine's RxNorm, to process surgical and risk assessment data. Key components of the project included a needs assessment with nurse reviewers and a data analysis for federated (standards were locally controlled) data sources. The resulting interface streamlines nurse reviewer workflow by integrating related tasks and data.
Uchida, Hiroyuki; Kobayashi, Mizuki; Hosobuchi, Ami; Ohta, Ayano; Ohtake, Kazuo; Yamaki, Tutomu; Uchida, Masaki; Odagiri, Youichi; Natsume, Hideshi; Kobayashi, Jun
2014-01-01
We aimed to determine the effects of age, period, and birth cohort on cervical cancer mortality rate trends in Japanese women, by age-period-cohort (APC) analysis. Additionally, we analyzed projected mortality rates. We obtained data on the number of cervical cancer deaths in Japanese women from 1975-2011 from the national vital statistics and census population data. A cohort table of mortality rate data was analyzed on the basis of a Bayesian APC model. We also projected the mortality rates for the 2012-2031 period. The period effect was relatively limited, compared with the age and cohort effects. The age effect increased suddenly from 25-29 to 45-49 years of age and gently increased thereafter. An analysis of the cohort effect on mortality rate trends revealed a steep decreasing slope for birth cohorts born from 1908-1940 and a subsequent sudden increase after 1945. The mortality rate projections indicated increasing trends from 40 to 74 years of age until the year 2031. The age effect increased from 25-29 years of age. This could be attributable to the high human papilloma virus (HPV) infection risk and the low cervical cancer screening rate. The cohort effect changed from decreasing to increasing after the early 1940s. This might be attributable to the spread of cervical cancer screening and treatment before 1940 and the high HPV infection risk and reduced cervical cancer screening rate after 1945. The projected mortality rate indicated an increasing trend until the year 2031.
Impact of Atmospheric Aerosols on Solar Photovoltaic Electricity Generation in China
NASA Astrophysics Data System (ADS)
Li, X.; Mauzerall, D. L.; Wagner, F.; Peng, W.; Yang, J.
2016-12-01
Hurricanes have induced devastating storm surge flooding worldwide. The impacts of these storms may worsen in the coming decades because of rapid coastal development coupled with sea-level rise and possibly increasing storm activity due to climate change. Major advances in coastal flood risk management are urgently needed. We present an integrated dynamic risk analysis for flooding task (iDraft) framework to assess and manage coastal flood risk at the city or regional scale, considering integrated dynamic effects of storm climatology change, sea-level rise, and coastal development. We apply the framework to New York City. First, we combine climate-model projected storm surge climatology and sea-level rise with engineering- and social/economic-model projected coastal exposure and vulnerability to estimate the flood damage risk for the city over the 21st century. We derive temporally-varying risk measures such as the annual expected damage as well as temporally-integrated measures such as the present value of future losses. We also examine the individual and joint contributions to the changing risk of the three dynamic factors (i.e., sea-level rise, storm change, and coastal development). Then, we perform probabilistic cost-benefit analysis for various coastal flood risk mitigation strategies for the city. Specifically, we evaluate previously proposed mitigation measures, including elevating houses on the floodplain and constructing flood barriers at the coast, by comparing their estimated cost and probability distribution of the benefit (i.e., present value of avoided future losses). We also propose new design strategies, including optimal design (e.g., optimal house elevation) and adaptive design (e.g., flood protection levels that are designed to be modified over time in a dynamic and uncertain environment).
Development/Modernization of an Advanced Non-Light Water Reactor Probabilistic Risk Assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Henneke, Dennis W.; Robinson, James
In 2015, GE Hitachi Nuclear Energy (GEH) teamed with Argonne National Laboratory (Argonne) to perform Research and Development (R&D) of next-generation Probabilistic Risk Assessment (PRA) methodologies for the modernization of an advanced non-Light Water Reactor (non-LWR) PRA. This effort built upon a PRA developed in the early 1990s for GEH’s Power Reactor Inherently Safe Module (PRISM) Sodium Fast Reactor (SFR). The work had four main tasks: internal events development modeling the risk from the reactor for hazards occurring at-power internal to the plant; an all hazards scoping review to analyze the risk at a high level from external hazards suchmore » as earthquakes and high winds; an all modes scoping review to understand the risk at a high level from operating modes other than at-power; and risk insights to integrate the results from each of the three phases above. To achieve these objectives, GEH and Argonne used and adapted proven PRA methodologies and techniques to build a modern non-LWR all hazards/all modes PRA. The teams also advanced non-LWR PRA methodologies, which is an important outcome from this work. This report summarizes the project outcomes in two major phases. The first phase presents the methodologies developed for non-LWR PRAs. The methodologies are grouped by scope, from Internal Events At-Power (IEAP) to hazards analysis to modes analysis. The second phase presents details of the PRISM PRA model which was developed as a validation of the non-LWR methodologies. The PRISM PRA was performed in detail for IEAP, and at a broader level for hazards and modes. In addition to contributing methodologies, this project developed risk insights applicable to non-LWR PRA, including focus-areas for future R&D, and conclusions about the PRISM design.« less
SSHAC Level 1 Probabilistic Seismic Hazard Analysis for the Idaho National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Payne, Suzette; Coppersmith, Ryan; Coppersmith, Kevin
A Probabilistic Seismic Hazard Analysis (PSHA) was completed for the Materials and Fuels Complex (MFC), Naval Reactors Facility (NRF), and the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) (Figure 1-1). The PSHA followed the approaches and procedures appropriate for a Study Level 1 provided in the guidance advanced by the Senior Seismic Hazard Analysis Committee (SSHAC) in U.S. Nuclear Regulatory Commission (NRC) NUREG/CR-6372 and NUREG-2117 (NRC, 1997; 2012a). The SSHAC Level 1 PSHAs for MFC and ATR were conducted as part of the Seismic Risk Assessment (SRA) project (INL Project number 31287) to develop and apply a new-riskmore » informed methodology, respectively. The SSHAC Level 1 PSHA was conducted for NRF to provide guidance on the potential use of a design margin above rock hazard levels. The SRA project is developing a new risk-informed methodology that will provide a systematic approach for evaluating the need for an update of an existing PSHA. The new methodology proposes criteria to be employed at specific analysis, decision, or comparison points in its evaluation process. The first four of seven criteria address changes in inputs and results of the PSHA and are given in U.S. Department of Energy (DOE) Standard, DOE-STD-1020-2012 (DOE, 2012a) and American National Standards Institute/American Nuclear Society (ANSI/ANS) 2.29 (ANS, 2008a). The last three criteria address evaluation of quantitative hazard and risk-focused information of an existing nuclear facility. The seven criteria and decision points are applied to Seismic Design Category (SDC) 3, 4, and 5, which are defined in American Society of Civil Engineers/Structural Engineers Institute (ASCE/SEI) 43-05 (ASCE, 2005). The application of the criteria and decision points could lead to an update or could determine that such update is not necessary.« less
Risk Management Model in Surface Exploitation of Mineral Deposits
NASA Astrophysics Data System (ADS)
Stojanović, Cvjetko
2016-06-01
Risk management is an integrative part of all types of project management. One of the main tasks of pre-investment studies and other project documentation is the tendency to protect investment projects as much as possible against investment risks. Therefore, the provision and regulation of risk information ensure the identification of the probability of the emergence of adverse events, their forms, causes and consequences, and provides a timely measures of protection against risks. This means that risk management involves a set of management methods and techniques used to reduce the possibility of realizing the adverse events and consequences and thus increase the possibilities of achieving the planned results with minimal losses. Investment in mining projects are of capital importance because they are very complex projects, therefore being very risky, because of the influence of internal and external factors and limitations arising from the socio-economic environment. Due to the lack of a risk management system, numerous organizations worldwide have suffered significant financial losses. Therefore, it is necessary for any organization to establish a risk management system as a structural element of system management system as a whole. This paper presents an approach to a Risk management model in the project of opening a surface coal mine, developed based on studies of extensive scientific literature and personal experiences of the author, and which, with certain modifications, may find use for any investment project, both in the mining industry as well as in investment projects in other areas.
NASA Astrophysics Data System (ADS)
Vicuña, Luis; Jurt, Christine; Minan, Fiorella; Huggel, Christian
2014-05-01
Models in a range of scientific disciplines are increasingly seen as indispensable for successful adaptation. Governments as well as international organizations and cooperations put their efforts in basing their adaptation projects on scientific results. Thereby, it is critical that scientific models are first put into the particular context in which they will be applied. This paper addresses the experience of the project 'Glaciers 513- Climate change adaptation and disaster risk management for glacier retreat in the Andes' conducted in the districts of Carhuaz (Ancash region) and Santa Teresa (Cusco region) in Peru. The Peruvian and the Swiss governments put their joint efforts in an adaptation project in the context of climate change and the retreat of the glaciers. The project is led by a consortium of Care Peru and the University of Zurich with additional Swiss partners and its principal aim is to improve the capacity for integral adaptation and reduce the risk of disasters from glaciers and high-mountain areas, and effects of climate change, particularly in the regions of Cusco and Ancash. The paper shows how the so called "human dimension" on the one hand, and models from a range of disciplines, including climatology, glaciology, and hydrology on the other hand, were conceptualized and perceived by the different actors involved in the project. Important aspects have been, among others, the role of local knowledge including ancestral knowledge, demographic information, socio-economic indicators as well as the social, political and cultural framework and the historical background. Here we analyze the role and context of local knowledge and the historical background. The analysis of the implications of the differences and similarities of the perceptions of a range of actors contributes to the discussion about how, and to what extent scientific models can be contextualized, what kind of information can be helpful for the contextualization and how it can be obtained. The results, thus, should contribute to more concerted, locally based and accepted risk and adaptation measures.
PRA (Probabilistic Risk Assessments) Participation versus Validation
NASA Technical Reports Server (NTRS)
DeMott, Diana; Banke, Richard
2013-01-01
Probabilistic Risk Assessments (PRAs) are performed for projects or programs where the consequences of failure are highly undesirable. PRAs primarily address the level of risk those projects or programs posed during operations. PRAs are often developed after the design has been completed. Design and operational details used to develop models include approved and accepted design information regarding equipment, components, systems and failure data. This methodology basically validates the risk parameters of the project or system design. For high risk or high dollar projects, using PRA methodologies during the design process provides new opportunities to influence the design early in the project life cycle to identify, eliminate or mitigate potential risks. Identifying risk drivers before the design has been set allows the design engineers to understand the inherent risk of their current design and consider potential risk mitigation changes. This can become an iterative process where the PRA model can be used to determine if the mitigation technique is effective in reducing risk. This can result in more efficient and cost effective design changes. PRA methodology can be used to assess the risk of design alternatives and can demonstrate how major design changes or program modifications impact the overall program or project risk. PRA has been used for the last two decades to validate risk predictions and acceptability. Providing risk information which can positively influence final system and equipment design the PRA tool can also participate in design development, providing a safe and cost effective product.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, K.D.
2006-07-01
Nuclear facility decontamination, dismantlement, and demolition activities provide a myriad of challenges along the path to reaching a safe, effective, and compliant decommissioning. Among the challenges faced during decommissioning, is the constant management and technical effort to eliminate, mitigate, or minimize the potential of risks of radiation exposures and other hazards to the worker, the surrounding community, and the environment. Management strategies to eliminate, mitigate, or minimize risks include incorporating strong safety and As Low As Reasonably Achievable (ALARA) principles into an integrated work planning process. Technical and operational strategies may include utilizing predictive risk analysis tools to establish contaminationmore » limits for demolition and using remote handling equipment to reduce occupational and radiation exposures to workers. ECC and E2 Closure Services, LLC (Closure Services) have effectively utilized these management and technical tools to eliminate, mitigate, and reduce radiation exposures under contract to the U.S. Department of Energy (DOE) for the decontamination and decommissioning Columbus Closure Project (CCP). In particular, Closure Services achieved significant dose reduction during the dismantling, decontamination, and demolition activities for Building JN-1. Management strategies during the interior dismantlement, decontamination, and demolition of the facility demanded an integrated work planning processes that involved project disciplines. Integrated planning processes identified multiple opportunities to incorporate the use of remote handling equipment during the interior dismantling and demolition activities within areas of high radiation. Technical strategies employed predictive risk analysis tools to set upper bounding contamination limits, allowed for the radiological demolition of the building without exceeding administrative dose limits to the worker, general public, and the environment. Adhering to management and technical strategies during the dismantlement, decontamination, and demolition of Building JN-1 enabled Closure Services to achieve strong ALARA performance, maintain absolute compliance under the regulatory requirements and meeting licensing conditions for decommissioning. (authors)« less
Extreme Storm Surges in the North Sea
NASA Astrophysics Data System (ADS)
Goennert, G.; Buß, Th.; Mueller, O.; Thumm, S.
2009-04-01
Extreme Storm Surges in the North Sea Gabriele Gönnert, Olaf Müller, Thomas Buß and Sigrid Thumm Climate Change will cause a rise of the sea level and probably more frequent and more violent storm surges. This has serious consequences for the safety of people as well as for their values and assets behind the dikes. It is therefore inevitable to first assess how sea level rise and an extreme storm surge event designes. In a second step it is possible to determine the risk for specific locations and develop strategies. The Project XtremRisk - Extreme Storm Surges at the North Sea Coast and in Estuaries. Risk calculation and risk strategies, funded by the German Federal Government will help answering these questions. The „Source-Pathway-Receptor" Concept will be used as a basis for risk analysis and development of new strategies. The Project offers methods to assess the development of extreme events under the conditions of today. Under conditions reflecting the climate change it will be tried to design an extreme event. For these three main points will be considered: a) Analysis and calculation of each factor, which produce a storm surge and its maximum level occurring in the last 100 years. These are: - maximum surge level: surge (due to the wind), - influence of the tide and the interaction between surge and tide, - influence of external surges , b) The hydrodynamics of a storm surge cause nonlinear effects in the interaction of the named factors. These factors and effects will both be taken into account to calculate the magnitude of the extreme storm surge. This step is very complex and need additional examination by numerical models. c) Analysis of the different scenarios to mean sea level rise and to the increase of wind speed due to the climate change. The presentation will introduce methods and show first results of the analysis of extreme events and the mean sea level rise.
Zeng, Wenfeng; Tan, Qiang; Wu, Shihua; Deng, Yingcong; Liu, Lifen; Wang, Zhi; Liu, Yimin
2015-12-01
To investigate the application of risk grading and classification for occupational hazards in risk management for a shipbuilding project. The risk management for this shipbuilding project was performed by a comprehensive application of MES evaluation, quality assessment of occupational health management, and risk grading and classification for occupational hazards, through the methods of occupational health survey, occupational health testing, and occupational health examinations. The results of MES evaluation showed that the risk of occupational hazards in this project was grade 3, which was considered as significant risk; Q value calculated by quality assessment of occupational health management was 0.52, which was considered to be unqualified; the comprehensive evaluation with these two methods showed that the integrated risk rating for this shipbuilding project was class D, and follow- up and rectification were needed with a focus on the improvement in health management. The application of MES evaluation and quality assessment of occupational health management in risk management for occupational hazards can achieve objective and reasonable conclusions and has good applicability.
Citizen Science to Support Community-based Flood Early Warning and Resilience Building
NASA Astrophysics Data System (ADS)
Paul, J. D.; Buytaert, W.; Allen, S.; Ballesteros-Cánovas, J. A.; Bhusal, J.; Cieslik, K.; Clark, J.; Dewulf, A.; Dhital, M. R.; Hannah, D. M.; Liu, W.; Nayaval, J. L.; Schiller, A.; Smith, P. J.; Stoffel, M.; Supper, R.
2017-12-01
In Disaster Risk Management, an emerging shift has been noted from broad-scale, top-down assessments towards more participatory, community-based, bottom-up approaches. Combined with technologies for robust and low-cost sensor networks, a citizen science approach has recently emerged as a promising direction in the provision of extensive, real-time information for flood early warning systems. Here we present the framework and initial results of a major new international project, Landslide EVO, aimed at increasing local resilience against hydrologically induced disasters in western Nepal by exploiting participatory approaches to knowledge generation and risk governance. We identify three major technological developments that strongly support our approach to flood early warning and resilience building in Nepal. First, distributed sensor networks, participatory monitoring, and citizen science hold great promise in complementing official monitoring networks and remote sensing by generating site-specific information with local buy-in, especially in data-scarce regions. Secondly, the emergence of open source, cloud-based risk analysis platforms supports the construction of a modular, distributed, and potentially decentralised data processing workflow. Finally, linking data analysis platforms to social computer networks and ICT (e.g. mobile phones, tablets) allows tailored interfaces and people-centred decision- and policy-support systems to be built. Our proposition is that maximum impact is created if end-users are involved not only in data collection, but also over the entire project life-cycle, including the analysis and provision of results. In this context, citizen science complements more traditional knowledge generation practices, and also enhances multi-directional information provision, risk management, early-warning systems and local resilience building.
Project Scheduling Based on Risk of Gas Transmission Pipe
NASA Astrophysics Data System (ADS)
Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.
2018-03-01
The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.
Analysis of Data in Accordance with Space Flight Mission Environmental Requirements
NASA Technical Reports Server (NTRS)
Shei, Monica
2011-01-01
The Environmental Assurance Program sets forth standards to ensure that all flight hardware is compatible with the environments that will be encountered during a spacecraft mission. It outlines the design, test and analysis, and risk control standards for the mission and certifies that it will survive in any external or self-induced environments that the spacecraft may experience. The Environmental Requirements Document (ERD) is the most important document in the Environmental Assurance Program, providing the design and test requirements for the project's flight system, subsystems, assemblies, and instruments. This summer's project was to assist Environmental Requirements Engineers (ERE's) in completing the Environmental Assurance Program Summary Report for both the Juno Project and Mars Science Laboratory (MSL) Project. The Summary Report is a document summarizing the environmental tests and analyses of each spacecraft at both the assembly and system level. It compiles a source of all relevant information such as waivers and Problem/Failure Reports (PFRs) into a single report for easy reference of how well the spacecraft met the requirements of the project.
EC FP6 Siberia-focused Enviro-RISKS Project and its Outcomes
NASA Astrophysics Data System (ADS)
Baklanov, A. A.; Gordov, E. P.
2009-04-01
The FP6 Project "Man-induced Environmental Risks: Monitoring, Management and Remediation of Man-made Changes in Siberia" (Enviro-RISKS) strategic objective is to facilitate elaboration of solid scientific background and understanding of man-made associated environmental risks, their influence on all aspects of regional environment and optimal ways for it remediation by means of coordinated initiatives of a range of relevant RTD projects as well as to achieve their improved integration thus giving the projects additional synergy in current activities and potential for practical applications. List of Partners includes 3 leading European research organizations, 6 leading Russian research organizations (5 - located in Siberia) and 1 organization from Kazakhstan. Additionally several Russian and European research organizations joined to the Project as Associated Partners. Scientific background and foundation for the project performance is formed by a number of different levels RTD projects carried out by Partners and devoted to near all aspects of the theme. The set comprise coordinated/performed by partners EC funded thematic international projects, Russian national projects and other projects performed by NIS partners. Project outcomes include, in particular, development and support of the bilingual Enviro-RISKS web portal (http://risks.scert.ru/) as the major tool for disseminations of environmental information and project results; achieved level of development of Siberia Integrated Regional Study (SIRS, http://sirs.scert.ru/), which is the Siberia-focused NEESPI Environmental Mega-Project ongoing under the auspices of the Siberian Branch of the Russian Academy of Sciences. The main Project outcome are Memorandum on the state of the art of environmental RTD activity in Siberia and Recommendations on future environmental RTD activity in Siberia elaborated by four Working Experts Groups working in most important for Siberia Thematic Focuses. Three Thematic Focuses/Groups consider major risks inherent to Siberia environment, while the forth Focus has a generic nature. These groups analyzed numerous RTD projects devoted Siberia environment and prepared Reports summarizing their findings. Focus groups Reports are published as a DMI Scientific Report: Atmospheric Pollution and Risks (www.dmi.dk/dmi/sr08-05-1.pdf), Climate/Global Change and Risks (www.dmi.dk/dmi/sr08-05-2.pdf), and Terrestrial Ecosystems and Hydrology and Risks (www.dmi.dk/dmi/sr08-05-3.pdf). Information Systems, Integration and Synthesis (www.dmi.dk/dmi/sr08-05-4.pdf). The results obtained form a solid basis for organization of a coordinated set of the new projects on Siberia environment.
On the Storm Surge and Sea Level Rise Projections for Infrastructure Risk Analysis and Adaptation
Storm surge can cause coastal hydrology changes, flooding, water quality changes, and even inundation of low-lying terrain. Strong wave actions and disruptive winds can damage water infrastructure and other environmental assets (hazardous and solid waste management facilities, w...
CSFII Analysis of Fat Intake Distributions 94-96 (1998 Survey Data)
Certain chemicals, such as dioxins tend to accumulate in fat tissue. Information about the total animal fat intake is necessary to adequately assess exposures and risks from these chemicals. Under this project, NCEA will desegregate the components of the various food items in the...
ERIC Educational Resources Information Center
Karadsheh, Louay A.
2010-01-01
This research focused on the challenges experienced when executing risk management activities for information technology projects. The lack of adequate knowledge management support of risk management activities has caused many project failures in the past. The research objective was to propose a conceptual framework of the Knowledge-Based Risk…
PredictABEL: an R package for the assessment of risk prediction models.
Kundu, Suman; Aulchenko, Yurii S; van Duijn, Cornelia M; Janssens, A Cecile J W
2011-04-01
The rapid identification of genetic markers for multifactorial diseases from genome-wide association studies is fuelling interest in investigating the predictive ability and health care utility of genetic risk models. Various measures are available for the assessment of risk prediction models, each addressing a different aspect of performance and utility. We developed PredictABEL, a package in R that covers descriptive tables, measures and figures that are used in the analysis of risk prediction studies such as measures of model fit, predictive ability and clinical utility, and risk distributions, calibration plot and the receiver operating characteristic plot. Tables and figures are saved as separate files in a user-specified format, which include publication-quality EPS and TIFF formats. All figures are available in a ready-made layout, but they can be customized to the preferences of the user. The package has been developed for the analysis of genetic risk prediction studies, but can also be used for studies that only include non-genetic risk factors. PredictABEL is freely available at the websites of GenABEL ( http://www.genabel.org ) and CRAN ( http://cran.r-project.org/).
NASA Technical Reports Server (NTRS)
Mendell, Wendell W.
1991-01-01
The International Space University (ISU) conducted a study of an international program to support human exploration of Mars as its annual Design Project activity during its 1991 summer session in Toulouse, France. Although an ISU Design Project strives to produce an in-depth analysis during the intense 10-week summer session, the International Mars Mission (IMM) project was conducted in a manner designed to provide a learning experience for young professionals working in an unusual multidisciplinary and multinational environment. The breadth of the IMM study exceeds that of most Mars mission studies of the past, encompassing political organization for long-term commitment, multinational management structure, cost analysis, mission architecture, vehicle configuration, crew health, life support, Mars surface infrastructure, mission operations, technology evaluation, risk assessment, scientific planning, exploration, communication networks, and Martian resource utilization. The IMM Final Report has particular value for those seeking insight into the choices made by a multinational group working in an apolitical environment on the problems of international cooperation in space.
Project-induced displacement, secondary stressors, and health.
Cao, Yue; Hwang, Sean-Shong; Xi, Juan
2012-04-01
It has been estimated that about 15 million people are displaced by development projects around the world each year. Despite the magnitude of people affected, research on the health and other impacts of project-induced displacement is rare. This study extends existing knowledge by exploring the short-term health impact of a large scale population displacement resulting from China's Three Gorges Dam Project. The study is theoretically guided by the stress process model, but we supplement it with Cernea's impoverishment risks and reconstruction (IRR) model widely used in displacement literature. Our panel analysis indicates that the displacement is associated positively with relocatees' depression level, and negatively with their self-rated health measured against a control group. In addition, a path analysis suggests that displacement also affects depression and self-rated health indirectly by changing social integration, socioeconomic status, and community resources. The importance of social integration as a protective mechanism, a factor that has been overlooked in past studies of population displacement, is highlighted in this study. Published by Elsevier Ltd.
PROJECT-INDUCED DISPLACEMENT, SECONDARY STRESSORS, AND HEALTH
Cao, Yue; Hwang, Sean-Shong; Xi, Juan
2012-01-01
It has been estimated that about 15 million people are displaced by development projects around the world each year. Despite the magnitude of people affected, research on the health and other impacts of project-induced displacement is rare. This study extends existing knowledge by exploring the short-term health impact of a large scale population displacement resulting from China’s Three Gorges Dam Project. The study is theoretically guided by the stress process model, but we supplement it with Cernea’s Impoverishment Risks and Reconstruction (IRR) model widely used in displacement literature. Our panel analysis indicates that the displacement is associated positively with relocatees’ depression level, and negatively with their self-rated health measured against a control group. In addition, a path analysis suggests that displacement also affects depression and self-rated health indirectly by changing social integration, socioeconomic status, and community resources. The importance of social integration as a protective mechanism, a factor that has been overlooked in past studies of population displacement, is highlighted in this study. PMID:22341203
NASA Astrophysics Data System (ADS)
Wan, Jiangping; Jones, James D.
2013-11-01
The Warfield version of systems science supports a wide variety of application areas, and is useful to practitioners who use the work program of complexity (WPOC) tool. In this article, WPOC is applied to information technology service management (ITSM) for managing the complexity of projects. In discussing the application of WPOC to ITSM, we discuss several steps of WPOC. The discovery step of WPOC consists of a description process and a diagnosis process. During the description process, 52 risk factors are identified, which are then narrowed to 20 key risk factors. All of this is done by interviews and surveys. Root risk factors (the most basic risk factors) consist of 11 kinds of common 'mindbugs' which are selected from an interpretive structural model. This is achieved by empirical analysis of 25 kinds of mindbugs. (A lesser aim of this research is to affirm that these mindbugs developed from a Western mindset have corresponding relevance in a completely different culture: the Peoples Republic of China.) During the diagnosis process, the relationships among the root risk factors in the implementation of the ITSM project are identified. The resolution step of WPOC consists of a design process and an implementation process. During the design process, issues related to the ITSM application are compared to both e-Government operation and maintenance, and software process improvement. The ITSM knowledge support structure is also designed at this time. During the implementation process, 10 keys to the successful implementation of ITSM projects are identified.
Analysis of High Plains Resource Risk and Economic Impacts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tidwell, Vincent C.; Vargas, Vanessa N; Jones, Shannon M
2016-04-01
The importance of the High Plains Aquifer is broadly recognized as is its vulnerability to continued overuse. T his study e xplore s how continued depletions of the High Plains Aquifer might impact both critical infrastructure and the economy at the local, r egional , and national scale. This analysis is conducted at the county level over a broad geographic region within the states of Kansas and Nebraska. In total , 140 counties that overlie the High Plains Aquifer in these two states are analyzed. The analysis utilizes future climate projections to estimate crop production. Current water use and managementmore » practices are projected into the future to explore their related impact on the High Plains Aquifer , barring any changes in water management practices, regulat ion, or policy. Finally, the impact of declining water levels and even exhaustion of groundwater resources are projected for specific sectors of the economy as well as particular elements of the region's critical infrastructure.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nelson, Jerel G.; Kruzic, Michael; Castillo, Carlos
2013-07-01
Chalk River Laboratory (CRL), located in Ontario Canada, has a large number of remediation projects currently in the Nuclear Legacy Liabilities Program (NLLP), including hundreds of facility decommissioning projects and over one hundred environmental remediation projects, all to be executed over the next 70 years. Atomic Energy of Canada Limited (AECL) utilized WorleyParsons to prioritize the NLLP projects at the CRL through a risk-based prioritization and ranking process, using the WorleyParsons Sequencing Unit Prioritization and Estimating Risk Model (SUPERmodel). The prioritization project made use of the SUPERmodel which has been previously used for other large-scale site prioritization and sequencing ofmore » facilities at nuclear laboratories in the United States. The process included development and vetting of risk parameter matrices as well as confirmation/validation of project risks. Detailed sensitivity studies were also conducted to understand the impacts that risk parameter weighting and scoring had on prioritization. The repeatable prioritization process yielded an objective, risk-based and technically defendable process for prioritization that gained concurrence from all stakeholders, including Natural Resources Canada (NRCan) who is responsible for the oversight of the NLLP. (authors)« less
Is it real? Can we win? Is it worth doing? Managing risk and reward in an innovation portfolio.
Day, George S
2007-12-01
Minor innovations make up most of a company's development portfolio, on average, but they never generate the growth companies seek. The solution, says Day--the Geoffrey T. Boisi Professor of Marketing and a codirector of the Mack Center for Technological Innovation at Wharton--is for companies to undertake a systematic, disciplined review of their innovation portfolios and increase the number of major innovations at an acceptable level of risk. Two tools can help them do this. The first, called the risk matrix, graphically reveals the distribution of risk across a company's entire innovation portfolio. The matrix allows companies to estimate each project's probability of success or failure, based on how big a stretch it is for the firm to undertake. The less familiar the product or technology and the intended market, the higher the risk. The second tool, dubbed the R-W-W (real-win-worth it) screen, allows companies to evaluate the risks and potential of individual projects by answering six fundamental questions about each one: Is the market real? Explores customers' needs, their willingness to buy, and the size of the potential market. Is the product real? Looks at the feasibility of producing the innovation. Can the product be competitive? and Can our company be competitive? Investigate how well suited the company's resources and management are to compete in the marketplace with the product. Will the product be profitable at an acceptable risk? Explores the financial analysis needed to assess an innovation's commercial viability. Last, Does launching the product make strategic sense? examines the project's fit with company strategy and whether management supports it.
Integrated risk and recovery monitoring of ecosystem restorations on contaminated sites
Hooper, Michael J.; Glomb, Stephen J.; Harper, David; Hoelzle, Timothy B.; McIntosh, Lisa M.; Mulligan, David R.
2016-01-01
Ecological restorations of contaminated sites balance the human and ecological risks of residual contamination with the benefits of ecological recovery and the return of lost ecological function and ecosystem services. Risk and recovery are interrelated dynamic conditions, changing as remediation and restoration activities progress through implementation into long-term management and ecosystem maturation. Monitoring restoration progress provides data critical to minimizing residual contaminant risk and uncertainty, while measuring ecological advancement toward recovery goals. Effective monitoring plans are designed concurrently with restoration plan development and implementation and are focused on assessing the effectiveness of activities performed in support of restoration goals for the site. Physical, chemical, and biotic measures characterize progress toward desired structural and functional ecosystem components of the goals. Structural metrics, linked to ecosystem functions and services, inform restoration practitioners of work plan modifications or more substantial adaptive management actions necessary to maintain desired recovery. Monitoring frequency, duration, and scale depend on specific attributes and goals of the restoration project. Often tied to restoration milestones, critical assessment of monitoring metrics ensures attainment of risk minimization and ecosystem recovery. Finally, interpretation and communication of monitoring findings inform and engage regulators, other stakeholders, the scientific community, and the public. Because restoration activities will likely cease before full ecosystem recovery, monitoring endpoints should demonstrate risk reduction and a successional trajectory toward the condition established in the restoration goals. A detailed assessment of the completed project's achievements, as well as unrealized objectives, attained through project monitoring, will determine if contaminant risk has been minimized, if injured resources have recovered, and if ecosystem services have been returned. Such retrospective analysis will allow better planning for future restoration goals and strengthen the evidence base for quantifying injuries and damages at other sites in the future.
Hydrologic Drought Decision Support System (HyDroDSS)
Granato, Gregory E.
2014-01-01
The hydrologic drought decision support system (HyDroDSS) was developed by the U.S. Geological Survey (USGS) in cooperation with the Rhode Island Water Resources Board (RIWRB) for use in the analysis of hydrologic variables that may indicate the risk for streamflows to be below user-defined flow targets at a designated site of interest, which is defined herein as data-collection site on a stream that may be adversely affected by pumping. Hydrologic drought is defined for this study as a period of lower than normal streamflows caused by precipitation deficits and (or) water withdrawals. The HyDroDSS is designed to provide water managers with risk-based information for balancing water-supply needs and aquatic-habitat protection goals to mitigate potential effects of hydrologic drought. This report describes the theory and methods for retrospective streamflow-depletion analysis, rank correlation analysis, and drought-projection analysis. All three methods are designed to inform decisions made by drought steering committees and decisionmakers on the basis of quantitative risk assessment. All three methods use estimates of unaltered streamflow, which is the measured or modeled flow without major withdrawals or discharges, to approximate a natural low-flow regime. Retrospective streamflow-depletion analysis can be used by water-resource managers to evaluate relations between withdrawal plans and the potential effects of withdrawal plans on streams at one or more sites of interest in an area. Retrospective streamflow-depletion analysis indicates the historical risk of being below user-defined flow targets if different pumping plans were implemented for the period of record. Retrospective streamflow-depletion analysis also indicates the risk for creating hydrologic drought conditions caused by use of a pumping plan. Retrospective streamflow-depletion analysis is done by calculating the net streamflow depletions from withdrawals and discharges and applying these depletions to a simulated record of unaltered streamflow. Rank correlation analysis in the HyDroDSS indicates the persistence of hydrologic measurements from month to month for the prediction of developing hydrologic drought conditions and quantitatively indicates which hydrologic variables may be used to indicate the onset of hydrologic drought conditions. Rank correlation analysis also indicates the potential use of each variable for estimating the monthly minimum unaltered flow at a site of interest for use in the drought-projection analysis. Rank correlation analysis in the HyDroDSS is done by calculating Spearman’s rho for paired samples and the 95-percent confidence limits of this rho value. Rank correlation analysis can be done by using precipitation, groundwater levels, measured streamflows, and estimated unaltered streamflows. Serial correlation analysis, which indicates relations between current and future values, can be done for a single site. Cross correlation analysis, which indicates relations among current values at one site and current and future values at a second site, also can be done. Drought-projection analysis in the HyDroDSS indicates the risk for being in a hydrologic drought condition during the current month and the five following months with and without pumping. Drought-projection analysis also indicates the potential effectiveness of water-conservation methods for mitigating the effect of withdrawals in the coming months on the basis of the amount of depletion caused by different pumping plans and on the risk of unaltered flows being below streamflow targets. Drought-projection analysis in the HyDroDSS is done with Monte Carlo methods by using the position analysis method. In this method the initial value of estimated unaltered streamflows is calculated by correlation to a measured hydrologic variable (monthly precipitation, groundwater levels, or streamflows from an index station identified with the rank correlation analysis). Then a pseudorandom number generator is used to create 251 six-month-long flow traces by using a bootstrap method. Serial correlation of the estimated unaltered monthly minimum streamflows determined from the rank correlation analysis is preserved within each flow trace. The sample of unaltered streamflows indicates the risk of being below flow targets in the coming months under simulated natural conditions (without historic withdrawals). The streamflow-depletion algorithms are then used to estimate risks of flow being below targets if selected pumping plans are used. This report also describes the implementation of the HyDroDSS. The HyDroDSS was developed as a Microsoft Access® database application to facilitate storage, handling, and use of hydrologic datasets with a simple graphical user interface. The program is implemented in the database by using the Visual Basic for Applications® (VBA) programming language. Program source code for the analytical techniques is provided in the HyDroDSS and in electronic text files accompanying this report. Program source code for the graphical user interface and for data-handling code, which is specific to Microsoft Access® and the HyDroDSS, is provided in the database. An installation package with a run-time version of the software is available with this report for potential users who do not have a compatible copy of Microsoft Access®. Administrative rights are needed to install this version of the HyDroDSS. A case study, to demonstrate the use of HyDroDSS and interpretation of results for a site of interest, is detailed for the USGS streamgage on the Hunt River (station 01117000) near East Greenwich in central Rhode Island. The Hunt River streamgage was used because it has a long record of streamflow and is in a well-studied basin with a substantial amount of hydrologic and water-use data including groundwater pumping for municipal water supply.
Risk assessment for construction projects of transport infrastructure objects
NASA Astrophysics Data System (ADS)
Titarenko, Boris
2017-10-01
The paper analyzes and compares different methods of risk assessment for construction projects of transport objects. The management of such type of projects demands application of special probabilistic methods due to large level of uncertainty of their implementation. Risk management in the projects requires the use of probabilistic and statistical methods. The aim of the work is to develop a methodology for using traditional methods in combination with robust methods that allow obtaining reliable risk assessments in projects. The robust approach is based on the principle of maximum likelihood and in assessing the risk allows the researcher to obtain reliable results in situations of great uncertainty. The application of robust procedures allows to carry out a quantitative assessment of the main risk indicators of projects when solving the tasks of managing innovation-investment projects. Calculation of damage from the onset of a risky event is possible by any competent specialist. And an assessment of the probability of occurrence of a risky event requires the involvement of special probabilistic methods based on the proposed robust approaches. Practice shows the effectiveness and reliability of results. The methodology developed in the article can be used to create information technologies and their application in automated control systems for complex projects.
Daniels, Jeffrey I; Chapman, Jenny B
2013-05-01
The Project Rulison underground nuclear test was a proof-of-concept experiment that was conducted under the Plowshare Program in 1969 in the Williams Fork Formation of the Piceance Basin in west-central Colorado. Today, commercial production of natural gas is possible from low permeability, natural gas bearing formations like that of the Williams Fork Formation using modern hydraulic fracturing techniques. With natural gas exploration and production active in the Project Rulison area, this human health risk assessment was performed in order to add a human health perspective for site stewardship. Tritium (H) is the radionuclide of concern with respect to potential induced migration from the test cavity leading to subsequent exposure during gas-flaring activities. This analysis assumes gas flaring would occur for up to 30 d and produce atmospheric H activity concentrations either as low as 2.2 × 10 Bq m (6 × 10 pCi m) from the minimum detectable activity concentration in produced water or as high as 20.7 Bq m (560 pCi m), which equals the highest atmospheric measurement reported during gas-flaring operations conducted at the time of Project Rulison. The lifetime morbidity (fatal and nonfatal) cancer risks calculated for adults (residents and workers) and children (residents) from inhalation and dermal exposures to such activity concentrations are all below 1 × 10 and considered de minimis. The implications for monitoring production water for conforming health-protective, risk-based action levels also are examined.
Risk Balance: A Key Tool for Mission Operations Assurance
NASA Technical Reports Server (NTRS)
Bryant, Larry W.; Faris, Grant B.
2011-01-01
The Mission Operations Assurance (MOA) discipline actively participates as a project member to achieve their common objective of full mission success while also providing an independent risk assessment to the Project Manager and Office of Safety and Mission Success staff. The cornerstone element of MOA is the independent assessment of the risks the project faces in executing its mission. Especially as the project approaches critical mission events, it becomes imperative to clearly identify and assess the risks the project faces. Quite often there are competing options for the project to select from in deciding how to execute the event. An example includes choices between proven but aging hardware components and unused but unproven components. Timing of the event with respect to visual or telecommunications visibility can be a consideration in the case of Earth reentry or hazardous maneuver events. It is in such situations that MOA is called upon for a risk balance assessment or risk trade study to support their recommendation to the Project Manager for a specific option to select. In the following paragraphs we consider two such assessments, one for the Stardust capsule Earth return and the other for the choice of telecommunications system configuration for the EPOXI flyby of the comet Hartley 2. We discuss the development of the trade space for each project's scenario and characterize the risks of each possible option. The risk characterization we consider includes a determination of the severity or consequence of each risk if realized and the likelihood of its occurrence. We then examine the assessment process to arrive at a MOA recommendation. Finally we review each flight project's decision process and the outcome of their decisions.
NASA Astrophysics Data System (ADS)
van Westen, Cees; Bakker, Wim; Zhang, Kaixi; Jäger, Stefan; Assmann, Andre; Kass, Steve; Andrejchenko, Vera; Olyazadeh, Roya; Berlin, Julian; Cristal, Irina
2014-05-01
Within the framework of the EU FP7 Marie Curie Project CHANGES (www.changes-itn.eu) and the EU FP7 Copernicus project INCREO (http://www.increo-fp7.eu) a spatial decision support system is under development with the aim to analyse the effect of risk reduction planning alternatives on reducing the risk now and in the future, and support decision makers in selecting the best alternatives. The Spatial Decision Support System will be composed of a number of integrated components. The Risk Assessment component allows to carry out spatial risk analysis, with different degrees of complexity, ranging from simple exposure (overlay of hazard and assets maps) to quantitative analysis (using different hazard types, temporal scenarios and vulnerability curves) resulting into risk curves. The platform does not include a component to calculate hazard maps, and existing hazard maps are used as input data for the risk component. The second component of the SDSS is a risk reduction planning component, which forms the core of the platform. This component includes the definition of risk reduction alternatives (related to disaster response planning, risk reduction measures and spatial planning) and links back to the risk assessment module to calculate the new level of risk if the measure is implemented, and a cost-benefit (or cost-effectiveness/ Spatial Multi Criteria Evaluation) component to compare the alternatives and make decision on the optimal one. The third component of the SDSS is a temporal scenario component, which allows to define future scenarios in terms of climate change, land use change and population change, and the time periods for which these scenarios will be made. The component doesn't generate these scenarios but uses input maps for the effect of the scenarios on the hazard and assets maps. The last component is a communication and visualization component, which can compare scenarios and alternatives, not only in the form of maps, but also in other forms (risk curves, tables, graphs). The envisaged users of the platform are organizations involved in planning of risk reduction measures, and that have staff capable of visualizing and analysing spatial data at a municipal scale.
Badri, Adel; Nadeau, Sylvie; Gbodossou, André
2012-09-01
Excluding occupational health and safety (OHS) from project management is no longer acceptable. Numerous industrial accidents have exposed the ineffectiveness of conventional risk evaluation methods as well as negligence of risk factors having major impact on the health and safety of workers and nearby residents. Lack of reliable and complete evaluations from the beginning of a project generates bad decisions that could end up threatening the very existence of an organization. This article supports a systematic approach to the evaluation of OHS risks and proposes a new procedure based on the number of risk factors identified and their relative significance. A new concept called risk factor concentration along with weighting of risk factor categories as contributors to undesirable events are used in the analytical hierarchy process multi-criteria comparison model with Expert Choice(©) software. A case study is used to illustrate the various steps of the risk evaluation approach and the quick and simple integration of OHS at an early stage of a project. The approach allows continual reassessment of criteria over the course of the project or when new data are acquired. It was thus possible to differentiate the OHS risks from the risk of drop in quality in the case of the factory expansion project. Copyright © 2011 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Ludwig, Ralf
2014-05-01
According to current climate projections, the Mediterranean area is at high risk for severe changes in the hydrological budget and extremes. With innovative scientific measures, integrated hydrological modeling and novel field geophysical field monitoring techniques, the FP7 project CLIMB (Climate Induced Changes on the Hydrology of Mediterranean Basins; GA: 244151) assessed the impacts of climate change on the hydrology in seven basins in the Mediterranean area, in Italy, France, Turkey, Tunisia, Egypt and the Gaza Strip, and quantified uncertainties and risks for the main stakeholders of each test site. Intensive climate model auditing selected four regional climate models, whose data was bias corrected and downscaled to serve as climate forcing for a set of hydrological models in each site. The results of the multi-model hydro-climatic ensemble and socio-economic factor analysis were applied to develop a risk model building upon spatial vulnerability and risk assessment. Findings generally reveal an increasing risk for water resources management in the test sites, yet at different rates and severity in the investigated sectors, with highest impacts likely to occur in the transition months. Most important elements of this research include the following aspects: • Climate change contributes, yet in strong regional variation, to water scarcity in the Mediterranean; other factors, e.g. pollution or poor management practices, are regionally still dominant pressures on water resources. • Rain-fed agriculture needs to adapt to seasonal changes; stable or increasing productivity likely depends on additional irrigation. • Tourism could benefit in shoulder seasons, but may expect income losses in the summer peak season due to increasing heat stress. • Local & regional water managers and water users, lack, as yet, awareness of climate change induced risks; emerging focus areas are supplies of domestic drinking water, irrigation, hydropower and livestock. • Data and knowledge gaps in climate change impact and risk assessment are still widespread and ask for extended and coordinated monitoring programs. In order to discover, visualize and provide access the results of the project, the CLIMB-Portal has been established, serving as a platform for dissemination of project results, including communication and planning for local and regional stakeholders.
Asteroid Deflection Mission Design Considering On-Ground Risks
NASA Astrophysics Data System (ADS)
Rumpf, Clemens; Lewis, Hugh G.; Atkinson, Peter
The deflection of an Earth-threatening asteroid requires high transparency of the mission design process. The goal of such a mission is to move the projected point of impact over the face of Earth until the asteroid is on a miss trajectory. During the course of deflection operations, the projected point of impact will match regions that were less affected before alteration of the asteroid’s trajectory. These regions are at risk of sustaining considerable damage if the deflecting spacecraft becomes non-operational. The projected impact point would remain where the deflection mission put it at the time of mission failure. Hence, all regions that are potentially affected by the deflection campaign need to be informed about this risk and should be involved in the mission design process. A mission design compromise will have to be found that is acceptable to all affected parties (Schweickart, 2004). A software tool that assesses the on-ground risk due to deflection missions is under development. It will allow to study the accumulated on-ground risk along the path of the projected impact point. The tool will help determine a deflection mission design that minimizes the on-ground casualty and damage risk due to deflection operations. Currently, the tool is capable of simulating asteroid trajectories through the solar system and considers gravitational forces between solar system bodies. A virtual asteroid may be placed at an arbitrary point in the simulation for analysis and manipulation. Furthermore, the tool determines the asteroid’s point of impact and provides an estimate of the population at risk. Validation has been conducted against the solar system ephemeris catalogue HORIZONS by NASA’s Jet Propulsion Laboratory (JPL). Asteroids that are propagated over a period of 15 years show typical position discrepancies of 0.05 Earth radii relative to HORIZONS’ output. Ultimately, results from this research will aid in the identification of requirements for deflection missions that enable effective, minimum risk asteroid deflection. Schweickart, R. L. (2004). THE REAL DEFLECTION DILEMMA. In 2004 Planetary Defense Conference: Protecting Earth from Asteroids (pp. 1-6). Orange County, California. Retrieved from http://b612foundation.org/wp-content/uploads/2013/02/Real_Deflection_Dilemma.pdf
Understanding safety and production risks in rail engineering planning and protection.
Wilson, John R; Ryan, Brendan; Schock, Alex; Ferreira, Pedro; Smith, Stuart; Pitsopoulos, Julia
2009-07-01
Much of the published human factors work on risk is to do with safety and within this is concerned with prediction and analysis of human error and with human reliability assessment. Less has been published on human factors contributions to understanding and managing project, business, engineering and other forms of risk and still less jointly assessing risk to do with broad issues of 'safety' and broad issues of 'production' or 'performance'. This paper contains a general commentary on human factors and assessment of risk of various kinds, in the context of the aims of ergonomics and concerns about being too risk averse. The paper then describes a specific project, in rail engineering, where the notion of a human factors case has been employed to analyse engineering functions and related human factors issues. A human factors issues register for potential system disturbances has been developed, prior to a human factors risk assessment, which jointly covers safety and production (engineering delivery) concerns. The paper concludes with a commentary on the potential relevance of a resilience engineering perspective to understanding rail engineering systems risk. Design, planning and management of complex systems will increasingly have to address the issue of making trade-offs between safety and production, and ergonomics should be central to this. The paper addresses the relevant issues and does so in an under-published domain - rail systems engineering work.
Peoples, M D; Grimson, R C; Daughtry, G L
1984-01-01
This study was designed to assess the effects of the North Carolina Improved Pregnancy Outcome (IPO) Project on use of prenatal care and incidence of low birthweight among its primarily Black registrants . Weighted least squares and stratified analysis procedures were used to scrutinize vital statistics data for subpopulation effects. IPO services were received by 51.7 per cent of Black women in the counties served by the project. For all Black registrants , the risk of receiving less than adequate prenatal care was 55.1 per cent of that of the comparison group. For Black teenage registrants , the risk was even less: 37.2 per cent of that of the comparison group. Nevertheless, no corresponding effects on the incidence of low birthweight could be detected. The evaluation methods used in this study can be applied to programs for mothers and infants in other locales to generate useful and practical information for state-level decision-making. PMID:6721010
Organizing Asian Pacific Islanders in an urban community to reduce HIV risk: a case study.
Loue, S; Lloyd, L S; Phoombour, E
1996-10-01
We present a case study of community organization efforts within the Asian Pacific Islander communities of San Diego County to reduce the risk of HIV transmission. We utilized a five-phase process to implement the strategies of locality development, social planning, and social action: community analysis, program design and initiation, program implementation, program maintenance and consolidation, and program reassessment. An evaluation of the process indicates that there were increases over time in the project's activities as well as in the levels of interagency connectedness. This is one of the few reported efforts to organize Asian Pacific Islander groups to address HIV transmission. Key elements that led to the successful organization of the original project into a tax-exempt nonprofit entity (the Asian Pacific Islander Community AIDS Project) were emphasis on community ownership, reliance on group consensus, use of "gatekeepers" to access communities, simultaneous multilevel programming, and service to the community as a "coordinating" entity.
NASA Technical Reports Server (NTRS)
Cucinotta, Francis A.
2007-01-01
Space radiation presents major challenges to astronauts on the International Space Station and for future missions to the Earth s moon or Mars. Methods used to project risks on Earth need to be modified because of the large uncertainties in projecting cancer risks from space radiation, and thus impact safety factors. We describe NASA s unique approach to radiation safety that applies uncertainty based criteria within the occupational health program for astronauts: The two terrestrial criteria of a point estimate of maximum acceptable level of risk and application of the principle of As Low As Reasonably Achievable (ALARA) are supplemented by a third requirement that protects against risk projection uncertainties using the upper 95% confidence level (CL) in the radiation cancer projection model. NASA s acceptable level of risk for ISS and their new lunar program have been set at the point-estimate of a 3-percent risk of exposure induced death (REID). Tissue-averaged organ dose-equivalents are combined with age at exposure and gender-dependent risk coefficients to project the cumulative occupational radiation risks incurred by astronauts. The 95% CL criteria in practice is a stronger criterion than ALARA, but not an absolute cut-off as is applied to a point projection of a 3% REID. We describe the most recent astronaut dose limits, and present a historical review of astronaut organ doses estimates from the Mercury through the current ISS program, and future projections for lunar and Mars missions. NASA s 95% CL criteria is linked to a vibrant ground based radiobiology program investigating the radiobiology of high-energy protons and heavy ions. The near-term goal of research is new knowledge leading to the reduction of uncertainties in projection models. Risk projections involve a product of many biological and physical factors, each of which has a differential range of uncertainty due to lack of data and knowledge. The current model for projecting space radiation cancer risk relies on the three assumptions of linearity, additivity, and scaling along with the use of population averages. We describe uncertainty estimates for this model, and new experimental data that sheds light on the accuracy of the underlying assumptions. These methods make it possible to express risk management objectives in terms of quantitative metrics, i.e., the number of days in space without exceeding a given risk level within well defined confidence limits. The resulting methodology is applied to several human space exploration mission scenarios including lunar station, deep space outpost, and a Mars mission. Factors that dominate risk projection uncertainties and application of this approach to assess candidate mitigation approaches are described.
Highlight report: Launch of a large integrated European in vitro toxicology project: EU-ToxRisk.
Daneshian, Mardas; Kamp, Hennicke; Hengstler, Jan; Leist, Marcel; van de Water, Bob
2016-05-01
The integrated European project, EU-ToxRisk, proudly sees itself as "flagship" exploring new alternative-to-animal approaches to chemical safety evaluation. It promotes mechanism-based toxicity testing and risk assessment according to the principles laid down for toxicology for the twenty-first century. The project was officially launched in January 2016 with a kickoff meeting in Egmond aan Zee, the Netherlands. Over 100 scientists representing academia and industry as well as regulatory authorities attended the inaugural meeting. The project will integrate advances in in vitro and in silico toxicology, read-across methods, and adverse outcome pathways. EU-ToxRisk will continue to make use of the case study strategy deployed in SEURAT-1, a FP7 initiative ended in December 2015. Even though the development of new non-animal methods is one target of EU-ToxRisk, the project puts special emphasis on their acceptance and implementation in regulatory contexts. This €30 million Horizon 2020 project involves 38 European partners and one from the USA. EU-ToxRisk aims at the "development of a new way of risk assessment."
Industrial Accidents Triggered by Natural Hazards: an Emerging Risk Issue
NASA Astrophysics Data System (ADS)
Renni, Elisabetta; Krausmann, Elisabeth; Basco, Anna; Salzano, Ernesto; Cozzani, Valerio
2010-05-01
Natural disasters such as earthquakes, tsunamis, flooding or hurricanes have recently and dramatically hit several countries worldwide. Both direct and indirect consequences involved the population, causing on the one hand a high number of fatalities and on the other hand so relevant economical losses that the national gross product may be affected for many years. Loss of critical industrial infrastructures (electricity generation and distribution, gas pipelines, oil refineries, etc.) also occurred, causing further indirect damage to the population. In several cases, accident scenarios with large releases of hazardous materials were triggered by these natural events, causing so-called "Natech events", in which the overall damage resulted from the simultaneous consequences of the natural event and of the release of hazardous substances. Toxic releases, large fires and explosions, as well as possible long-term environmental pollution, economical losses, and overloading of emergency systems were recognised by post-event studies as the main issues of these Natech scenarios. In recent years the increasing frequency and severity of some natural hazards due to climate change has slowly increased the awareness of Natech risk as an emerging risk among the stakeholders. Indeed, the iNTeg-Risk project, co-funded by the European Commission within the 7th Framework Program specifically addresses these scenarios among new technological issues on public safety. The present study, in part carried out within the iNTeg-Risk project, was aimed at the analysis and further development of methods and tools for the assessment and mitigation of Natech accidents. Available tools and knowledge gaps in the assessment of Natech scenarios were highlighted. The analysis mainly addressed the potential impact of flood, lightning and earthquake events on industrial installations where hazardous substances are present. Preliminary screening methodologies and more detailed methods based on quantitative risk analysis were developed. Strategies based on the use of multiple information layers aiming at the identification of mitigation and early warning systems were also explored. A case-study in the Emilia-Romagna region is presented.
NASA Technical Reports Server (NTRS)
Jones, Harry W.; Dillon-Merrill, Robin L.; Thomas, Gretchen A.
2003-01-01
The Advanced Integration Matrix (AIM) Project u7ill study and solve systems-level integration issues for exploration missions beyond Low Earth Orbit (LEO), through the design and development of a ground-based facility for developing revolutionary integrated systems for joint human-robotic missions. This paper describes a Probabilistic Risk Analysis (PRA) of human space missions that was developed to help define the direction and priorities for AIM. Risk analysis is required for all major NASA programs and has been used for shuttle, station, and Mars lander programs. It is a prescribed part of early planning and is necessary during concept definition, even before mission scenarios and system designs exist. PRA cm begin when little failure data are available, and be continually updated and refined as detail becomes available. PRA provides a basis for examining tradeoffs among safety, reliability, performance, and cost. The objective of AIM's PRA is to indicate how risk can be managed and future human space missions enabled by the AIM Project. Many critical events can cause injuries and fatalities to the crew without causing loss of vehicle or mission. Some critical systems are beyond AIM's scope, such as propulsion and guidance. Many failure-causing events can be mitigated by conducting operational tests in AIM, such as testing equipment and evaluating operational procedures, especially in the areas of communications and computers, autonomous operations, life support, thermal design, EVA and rover activities, physiological factors including habitation, medical equipment, and food, and multifunctional tools and repairable systems. AIM is well suited to test and demonstrate the habitat, life support, crew operations, and human interface. Because these account for significant crew, systems performance, and science risks, AIM will help reduce mission risk, and missions beyond LEO are far enough in the future that AIM can have significant impact.
Managing dependencies in forest offset projects: toward a more complete evaluation of reversal risk
David M Cooley; Chrsitopher S Galik; Thomas P Holmes; Carolyn Kousky; Roger M Cooke
2011-01-01
Although forest carbon offsets can play an important role in the implementation of comprehensive climate policy, they also face an inherent risk of reversal. If such risks are positively correlated across projects, it can affect the integrity of larger project portfolios and potentially the entire offsets program. Here, we discuss three types of risks that could affect...
IV&V Project Assessment Process Validation
NASA Technical Reports Server (NTRS)
Driskell, Stephen
2012-01-01
The Space Launch System (SLS) will launch NASA's Multi-Purpose Crew Vehicle (MPCV). This launch vehicle will provide American launch capability for human exploration and travelling beyond Earth orbit. SLS is designed to be flexible for crew or cargo missions. The first test flight is scheduled for December 2017. The SLS SRR/SDR provided insight into the project development life cycle. NASA IV&V ran the standard Risk Based Assessment and Portfolio Based Risk Assessment to identify analysis tasking for the SLS program. This presentation examines the SLS System Requirements Review/System Definition Review (SRR/SDR), IV&V findings for IV&V process validation correlation to/from the selected IV&V tasking and capabilities. It also provides a reusable IEEE 1012 scorecard for programmatic completeness across the software development life cycle.
Lech, Przemysław
2016-01-01
The purpose of this research was to investigate the causes of the dominant risk factors, affecting Enterprise System implementation projects and propose remedies for those risk factors from the perspective of implementation consultants. The study used a qualitative research strategy, based on e-mail interviews, semi-structured personal interviews with consultants and participant observation during implementation projects. The main contribution of this paper is that it offers viable indications of how to mitigate the dominant risk factors. These indications were grouped into the following categories: stable project scope, smooth communication supported by the project management, dedicated, competent and decision-making client team, competent and engaged consultant project manager, schedule and budget consistent with the project scope, use of methodology and procedures, enforced and enabled by the project managers, competent and dedicated consultants. A detailed description is provided for each category.
DOT National Transportation Integrated Search
2014-02-01
This report assesses opportunities, risks, and challenges attendant to future development and deployment of UAS within the National Airspace System (NAS) affecting UAS forecast growth from 2015 to 2035. Analysis of four key areas is performed: techno...
Assessment of potential economic and environmental impacts caused by Phytophthora ramorum in Europe
Hella Kehlenbeck
2008-01-01
Economic and environmental impacts of Phytophthora ramorum in Europe were evaluated within the European Union framework 6 project on ?Risk Analysis for P. ramorum a pathogen threat to Europe? (RAPRA). Impact assessment was conducted according to three different scenarios: 1. ?Nursery System? - describes losses occurring in...
Evaluation of fungicides for control of Phytophthora ramorum
S. Wagner; K. Kaminski; S. Werres
2008-01-01
As part of the project European Phytophthora ramorum Pest Risk Analysis (RAPRA) a wide range of fungicides was tested for in vitro activity against mycelial growth and zoospore germination of P. ramorum. A preliminary set of experiments was performed to study the effect of nine common fungicides specific for
Designing a Standard Model for Development and Execution of an Analysis Project Plan
2012-06-01
mitigations set forth are agreeable to all parties involved. 1.3 Document Risks, Issues, and Constraints 1.1 Gather Information 1.2 Develop...parent requirement into lower level objective, performance-based sibling actions. Collective accomplishment of the set of derived “ sibling ” actions
As part of an EPA/USGS project to predict the relative vulnerability of near-coastal species to climate change, we have synthesized in a web-based tool, the Coastal Biogeographic Risk Analysis Tool (CBRAT), the biogeographic distributions and abundances of bivalves, found in dept...
Risk Assessment on Constructors during Over-water Riprap Based on Entropy Weight and FAHP
NASA Astrophysics Data System (ADS)
Wu, Tongqing; Li, Liang; Liang, Zelong; Mao, Tian; Shao, Weifeng
2017-07-01
Being aimed at waterway regulation engineering, there exist risks of over-water riprap for constructors which keeps uncertainty and complexity. For the purpose of evaluating the possibility and consequence, this paper utilizes fuzzy analytic hierarchy process with abbreviation of FAHP to do empowerment on the related risk indicators, constructs FAHP under entropy weight and establishes relevant evaluation factor set and evaluation language for constructors during over-water riprap construction process. Through doing risk probability estimation and risk consequence size evaluation on the factor of constructors, this paper introduces this model into risk analysis on constructors during over-water riprap of Ching River waterway regulation project. Results show that evaluation of this method is so credible that it could be utilized in practical engineering.
Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.
2011-01-01
The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.
Fuzzy net present valuation based on risk assessment of Malaysian infrastructure
NASA Astrophysics Data System (ADS)
Shaffie, Siti Salihah; Jaaman, Saiful Hafizah; Mohamad, Daud
2017-04-01
In recent years, built-operate-transfer (BOT) projects have profoundly been accepted under project financing for infrastructure developments in many countries. It requires high financing and involves complex mutual risk. The assessment of the risks is vital to avert huge financial loss. Net present value is widely applied to BOT project where the uncertainties in cash flows are deemed to be deterministic values. This study proposed a fuzzy net present value model taking consideration the assessment of risks from the BOT project. The proposed model is adopted to provide more flexible net present valuation of the project. It is shown and proven that the improved fuzzy cash flow model will provide a valuation that is closed to the real value of the project.
Uncertainties in Projecting Risks of Late Effects from Space Radiation
NASA Astrophysics Data System (ADS)
Cucinotta, F.; Schimmerling, W.; Peterson, L.; Wilson, J.; Saganti, P.; Dicello, J.
The health risks faced by astronauts from space radiation include cancer, cataracts, hereditary effects, CNS risks, and non - cancer morbidity and mortality risks related to the diseases of the old age. Methods used to project risks in low -Earth orbit are of questionable merit for exploration missions because of the limited radiobiology data and knowledge of galactic cosmic ray (GCR) heavy ions, which causes estimates of the risk of late effects to be highly uncertain. Risk projections involve a product of many biological and physical factors, each of which has a differential range of uncertainty due to lack of data and knowledge. Within the linear-additivity model, we use Monte-Carlo sampling from subjective uncertainty distributions in each factor to obtain a maximum likelihood estimate of the overall uncertainty in risk projections. The resulting methodology is applied to several human space exploration mission scenarios including ISS, lunar station, deep space outpost, and Mar's missions of duration of 360, 660, and 1000 days. The major results are the quantification of the uncertainties in current risk estimates, the identification of the primary factors that dominate risk projection uncertainties, and the development of a method to quantify candidate approaches to reduce uncertainties or mitigate risks. The large uncertainties in GCR risk projections lead to probability distributions of risk that mask any potential risk reduction using the "optimization" of shielding materials or configurations. In contrast, the design of shielding optimization approaches for solar particle events and trapped protons can be made at this time, and promising technologies can be shown to have merit using our approach. The methods used also make it possible to express risk management objectives in terms of quantitative objectives, i.e., number of days in space without exceeding a given risk level within well defined confidence limits
Land, Charles E.; Bouville, Andre; Apostoaei, Iulian; Simon, Steven L.
2013-01-01
Radioactive fallout from nuclear test detonations during 1946–1958 at Bikini and Enewetak atolls in the Marshall Islands (MI) exposed populations living elsewhere in the archipelago. A comprehensive analysis, presented in seven companion papers, has produced estimates of tissue-specific radiation absorbed dose to MI residents at all historically inhabited atolls from internal (ingested) and external radioactive components of fallout, by calendar year, and by age of the population at time of exposure. The present report deals, for the first time, with the implications of these doses on cancer risk among exposed members of the MI population. Radiation doses differed by geographic location and year of birth, and radiation-related cancer risk depends upon age at exposure and age at observation for risk. Using dose-response models based on committee reports published by the National Research Council and the National Institutes of Health, we project that, during the lifetimes of members of the MI population potentially exposed to ionizing radiation from weapons test fallout deposited during the testing period (1948–1958) and from residual radioactive sources during the subsequent 12 years (1959–1970), perhaps 1.6% (with 90% uncertainty range 0.4% and 3.4%) of all cancers might be attributable to fallout-related radiation exposures. The projected proportion of cancers attributable to radiation from fallout from all nuclear tests conducted in the Marshall Islands is 55% (28%–69%) among 82 persons exposed in 1954 on Rongelap and Ailinginae, 10% (2%–22%) for 157 persons exposed on Utrik, and 2% (0.5%–5%) and 1% (0.2%–2%), respectively, for the much larger populations exposed in mid-latitude locations including Kwajalein and in southern locations including Majuro. By cancer type, point estimates of attributable risk varied by location, between 12% and 95% for thyroid cancer, between 2% and 78% for leukemia, and between 1% and 55% for all cancers combined. The largest projected risks pertain to the Rongelap Island community and the lowest risks pertain to the populations resident on the southern-most atolls. While the projected cancer risks are smaller than those estimated by the National Cancer Institute in simplistic analyses conducted in 2004, these estimates of cancer risk are the best available as they are based on the most detailed dose reconstruction to date and comprehensively include populations at all locations and dose contributions from all nuclear tests. PMID:20622551
Amiri, Mohammadreza; Majid, Hazreen Abdul; Hairi, FarizahMohd; Thangiah, Nithiah; Bulgiba, Awang; Su, Tin Tin
2014-01-01
The objectives are to assess the prevalence and determinants of cardiovascular disease (CVD) risk factors among the residents of Community Housing Projects in metropolitan Kuala Lumpur, Malaysia. By using simple random sampling, we selected and surveyed 833 households which comprised of 3,722 individuals. Out of the 2,360 adults, 50.5% participated in blood sampling and anthropometric measurement sessions. Uni and bivariate data analysis and multivariate binary logistic regression were applied to identify demographic and socioeconomic determinants of the existence of having at least one CVD risk factor. As a Result, while obesity (54.8%), hypercholesterolemia (51.5%), and hypertension (39.3%) were the most common CVD risk factors among the low-income respondents, smoking (16.3%), diabetes mellitus (7.8%) and alcohol consumption (1.4%) were the least prevalent. Finally, the results from the multivariate binary logistic model illustrated that compared to the Malays, the Indians were 41% less likely to have at least one of the CVD risk factors (OR = 0.59; 95% CI: 0.37 - 0.93). In Conclusion, the low-income individuals were at higher risk of developing CVDs. Prospective policies addressing preventive actions and increased awareness focusing on low-income communities are highly recommended and to consider age, gender, ethnic backgrounds, and occupation classes.
Kuhl, Ashley; van Calcar, Sandra; Baker, Mei; Seroogy, Christine M; Rice, Gregory; Scott Schwoerer, Jessica
2017-03-01
This community project is an initiative through the University of Wisconsin Biochemical Genetics Clinic and the Wisconsin Newborn Screening Program to identify members of the Plain population who are at risk for having children with maple syrup urine disease (MSUD) or propionic acidemia (PA) or who have PA. Because of the high prevalence of metabolic conditions in the Plain population and the importance of early intervention, a statewide outreach project was developed to provide targeted variant analysis of the common MSUD and PA pathogenic variants in this population through health-care provider distribution of blood spot testing kits. Awareness was achieved through outreach efforts with the state midwives guild and Plain population meetings. Eighty individuals were tested; diagnosis was confirmed for three adults with PA and one couple was identified as being at risk for having a child with PA. Genetic counseling was provided to those identified. Follow-up diagnostic testing was completed for the at-risk couple's children; none were found to be affected. This initiative successfully provided accessible clinical testing for MSUD and PA for a high-risk population. Early identification of at-risk couples sets the foundation for early care of at-risk neonates, thereby improving future clinical outcomes.Genet Med 19 3, 352-356.
Coastal vulnerability: climate change and natural hazards perspectives
NASA Astrophysics Data System (ADS)
Romieu, E.; Vinchon, C.
2009-04-01
Introduction Studying coastal zones as a territorial concept (Integrated coastal zone management) is an essential issue for managers, as they have to consider many different topics (natural hazards, resources management, tourism, climate change…). The recent approach in terms of "coastal vulnerability" studies (since the 90's) is the main tool used nowadays to help them in evaluating impacts of natural hazards on coastal zones, specially considering climate change. This present communication aims to highlight the difficulties in integrating this concept in risk analysis as it is usually practiced in natural hazards sciences. 1) Coastal vulnerability as a recent issue The concept of coastal vulnerability mainly appears in the International panel on climate change works of 1992 (IPCC. 2001), where it is presented as essential for climate change adaptation. The concept has been defined by a common methodology which proposes the assessment of seven indicators, in regards to a sea level rise of 1m in 2100: people affected, people at risk, capital value at loss, land at loss, wetland at loss, potential adaptation costs, people at risk assuming this adaptation. Many national assessments have been implemented (Nicholls, et al. 1995) and a global assessment was proposed for three indicators (Nicholls, et al. 1999). The DINAS-Coast project reuses this methodology to produce the DIVA-tool for coastal managers (Vafeidis, et al. 2004). Besides, many other methodologies for national or regional coastal vulnerability assessments have been developed (review by (UNFCCC. 2008). The use of aggregated vulnerability indicators (including geomorphology, hydrodynamics, climate change…) is widespread: the USGS coastal vulnerability index is used worldwide and was completed by a social vulnerability index (Boruff, et al. 2005). Those index-based methods propose a vulnerability mapping which visualise indicators of erosion, submersion and/or socio economic sensibility in coastal zones. This concept is a great tool for policy makers to help managing their action and taking into account climate change (McFadden, et al. 2006). However, in those approaches, vulnerability is the output itself (cost of effective impacts, geomorphologic impacts…), but is not integrated it in a risk analysis. Furthermore, those studies emerged from a climatic perspective, which leads to consider climate change as a hazard or pressure whereas risk studies commonly consider hazards such as erosion and flooding, where climate change modifies the drivers of the hazard. 2) The natural hazards and socio economic perspectives In order to reduce impacts of natural hazards, decision makers need a complete risk assessment (probability of losses). Past studies on natural risks (landslide, earthquake...) highlighted the pertinence of defining risk as a combination of : (1)hazard occurrence and intensity, (2) exposition and (3)vulnerability of assets and population to this hazard (e.g. Douglas. 2007, Sarewitz, et al. 2003). Following the Renn and Klinke risk assessment frame, high uncertainties associated with coastal risks considering climatic and anthropic change highlights the importance of working on that concept of "vulnerability" (Klinke and Renn. 2002). Past studies on vulnerability assessment showed a frequently mentioned gap between "impact based" and "human based" points of view. It is nowadays a great issue for natural risk sciences. Many research efforts in FP7 projects such as MOVE and ENSURE focus on integrating the different dimensions of vulnerability (Turner, et al. 2003, Birkmann. 2006). Coastal risk studies highlight another issue of concern. We previously detailed the different use of the term "vulnerability" in the coastal context, quite different of the "natural risk's" use. Interaction of social, economic and physical sciences is considered within two french research projects (Vulsaco, Miseeva), in order to identify the vulnerability of a system to flooding or erosion (i.e. its characteristics that create potential harm), and integrate them in a risk assessment. Global change is considered by modifications of hazard, anthropogenic pressure and exposition, in order to point out possible modification of vulnerabilities. 3) Learning from both perspectives Coastal vulnerability in its "end in itself" and climate change dimension is a widespread tool for decision makers but it can be inadequate when vulnerability is a component of risk. This is mainly due to the consideration of climate change as a "hazard", so that coastal vulnerability is seen as the possible adverse impacts of climate change. As a matter of fact, this concept is clearly well considered by managers, who feel deeply concerned by climate change. However, coastal risk managers would gain in considering climate change more like a driver able to modify existing hazards than like the pressure in itself. Using this concept could lead to new perspectives of coastal risk mitigation for decision makers (social vulnerability, risk perception…), learning from other disciplines and sciences thanks to research projects such as MOVE (FP7). Acknowledgements The authors would like to thank the BRGM coastal team for rich discussions and fruitful collaborations in coastal vulnerability studies, more specially Déborah Idier for animating the Vulsaco project and Manuel Garcin for his work on tsunamis in Sri Lanka. They are also grateful to the MISEEVA and MOVE teams, which are doing some great trans-disciplinary work. References Birkmann, J., 2006. Measuring vulnerability to Natural Hazards : towards disaster resilient societies. United Nations University Press. Boruff, B. J., Emrich, C., Cutter, S. L., 2005. Erosion hazard vulnerability of US coastal counties. Journal of Coastal Research. 21, 932-942. Douglas, J., 2007. Physical vulnerability modelling in natural hazard risk assessment. Natural Hazards and Earth System Sciences. 7, 283-288. IPCC, 2001. Climate change 2001 : synthesis report. A contribution of working groups I, II and III to the Third Assesment Report of the Intergovernmental Panel on Climate Change. Klinke, A. and Renn, O., 2002. A new approach to risk evaluation and management : risk based, precaution based and discourse based strategies. Risk Analysis. 22, 1071-1094. McFadden, L., Nicholls, R.J., Penning-Rowsell, E. (Eds.), 2006. Managing coastal vulnerability. Elsevier Science. Nicholls, R. J., Hoozemans, F. M. J., Marchand, M., 1999. Increasing flood risk and wetland losses due to global sea-level rise: regional and global analyses. Global Environmental Change, Part A: Human and Policy Dimensions. 9, S69-S87. Nicholls, R. J., Leatherman, S. P., Volonte, C. R., 1995. Impacts and responses to sea-level rise; qualitative and quantitative assessments; Potential impacts of accelerated sea-level rise on developing countries. Journal of Coastal Research. Special issue 14, 26-43. Sarewitz, D., Pielke, R., Keykhah, M., 2003. Vulnerability and Risk: Some Thoughts from a Political and Policy Perspective. Risk Analysis. 23, 805-810. Turner, B. L.,II, Kasperson, R. E., Matson, P. A., McCarthy, J. J., Corell, R. W., Christensen, L., Eckley, N., Kasperson, J. X., Luers, A., Martello, M. L., Polsky, C., Pulsipher, A., Schiller, A., 2003. A framework for vulnerability analysis in sustainability science. Proceedings of the National Academy of Sciences, USA. 100, 8074-8079. UNFCCC, 2008. Compendium on methods and tools to evaluate impacts of vulnerability and adaptation to climate change. Vafeidis, A., Nicholls, R., McFadden, L., 2004. Developing a database for global vulnerability analysis of coastal zones: The DINAS-COAST project and the DIVA tool.
Costa, Bernardo; Cabré, Joan J; Sagarra, Ramon; Solà-Morales, Oriol; Barrio, Francisco; Piñol, Josep L; Cos, Xavier; Bolíbar, Bonaventura; Castell, Conxa; Kissimova-Skarbek, Katarzyna; Tuomilehto, Jaakko
2011-08-04
Type 2 diabetes is an important preventable disease and a growing public health problem. Based on information provided by clinical trials, we know that Type 2 diabetes can be prevented or delayed by lifestyle intervention. In view of translating the findings of diabetes prevention research into real-life it is necessary to carry out community-based evaluations so as to learn about the feasibility and effectiveness of locally designed and implemented programmes. The aim of this project was to assess the effectiveness of an active real-life primary care strategy in high-risk individuals for developing diabetes, and then evaluate its efficiency. Cost-Effectiveness analysis of the DE-PLAN (Diabetes in Europe - Prevention using Lifestyle, physical Activity and Nutritional intervention) project when applied to a Mediterranean population in Catalonia (DE-PLAN-CAT). Multicenter, longitudinal cohort assessment (4 years) conducted in 18 primary health-care centres (Catalan Health Institute). Individuals without diabetes aged 45-75 years were screened using the Finnish Diabetes Risk Score - FINDRISC - questionnaire and a 2-h oral glucose tolerance test. All high risk tested individuals were invited to participate in either a usual care intervention (information on diet and cardiovascular health without individualized programme), or the intensive DE-PLAN educational program (individualized or group) periodically reinforced. Oral glucose tolerance test was repeated yearly to determine diabetes incidence. Besides measuring the accumulated incidence of diabetes, information was collected on economic impact of the interventions in both cohorts (using direct and indirect cost questionnaires) and information on utility measures (Quality Adjusted Life Years). A cost-utility and a cost-effectiveness analysis will be performed and data will be modelled to predict long-term cost-effectiveness. The project was intended to evidence that a substantial reduction in Type 2 diabetes incidence can be obtained at a reasonable cost-effectiveness ratio in real-life primary health care setting by an intensive lifestyle intervention. As far as we know, the DE-PLAN-CAT/PREDICE project represents the first assessment of long-term effectiveness and cost-effectiveness of a public healthcare strategy to prevent diabetes within a European primary care setting.
ERIC Educational Resources Information Center
Osler, James Edward; Waden, Carl
2012-01-01
This paper provides an active discourse on the use of innovative solutions to conduct an in-depth investigation on the success and viability of 9th Grade Freshman Academies, Centers, and Center Models to aid in the retention of at risk students. These types of academic programs provide an active solution for the retention and projected completion…
Zhou, Qiongjie; Zhang, Shikun; Wang, Qiaomei; Shen, Haiping; Tian, Weidong; Chen, Jingqi; Acharya, Ganesh; Li, Xiaotian
2016-12-28
Preconception care (PCC) is recommended for optimizing a woman's health prior to pregnancy to minimize the risk of adverse pregnancy and birth outcomes. We aimed to evaluate the impact of strategy and a novel risk classification model of China´s "National Preconception Health Care Project" (NPHCP) in identifying risk factors and stratifying couples' preconception health status. We performed a secondary analysis of data collected by NPHCP during April 2010 to December 2012 in 220 selected counties in China. All couples enrolled in the project accepted free preconception health examination, risk evaluation, health education and medical advice. Risk factors were categorized into five preconception risk classes based on their amenability to prevention and treatment: A-avoidable risk factors, B- benefiting from targeted medical intervention, C-controllable but requiring close monitoring and treatment during pregnancy, D-diagnosable prenatally but not modifiable preconceptionally, X-pregnancy not advisable. Information on each couple´s socio-demographic and health status was recorded and further analyzed. Among the 2,142,849 couples who were enrolled to this study, the majority (92.36%) were from rural areas with low education levels (89.2% women and 88.3% men had education below university level). A total of 1463266 (68.29%) couples had one or more preconception risk factors mainly of category A, B and C, among which 46.25% were women and 51.92% were men. Category A risk factors were more common among men compared with women (38.13% versus 11.24%; P = 0.000). This project provided new insights into preconception health of Chinese couples of reproductive age. More than half of the male partners planning to father a child, were exposed to risk factors during the preconception period, suggesting that an integrated approach to PCC including both women and men is justified. Stratification based on the new risk classification model demonstrated that a majority of the risk factors are avoidable, or preventable by medical intervention. Therefore, universal free PCC can be expected to improve pregnancy outcomes in rural China.
Eaton, Lisa A.; Kalichman, Seth C.; Kenny, David A.; Harel, Ofer
2013-01-01
Background Project EXPLORE -- a large-scale, behavioral intervention tested among men who have sex with men (MSM) at-risk for HIV infection --was generally deemed as ineffective in reducing HIV incidence. Using novel and more precise data analytic techniques we reanalyzed Project EXPLORE by including both direct and indirect paths of intervention effects. Methods Data from 4,296 HIV negative MSM who participated in Project EXPLORE, which included ten sessions of behavioral risk reduction counseling completed from 1999-2005, were included in the analysis. We reanalyzed the data to include parameters that estimate the overtime effects of the intervention on unprotected anal sex and the over-time effects of the intervention on HIV status mediated by unprotected anal sex simultaneously in a single model. Results We found the indirect effect of intervention on HIV infection through unprotected anal sex to be statistically significant up through 12 months post-intervention, OR=.83, 95% CI=.72-.95. Furthermore, the intervention significantly reduced unprotected anal sex up through 18 months post-intervention, OR=.79, 95% CI=.63-.99. Discussion Our results reveal effects not tested in the original model that offer new insight into the effectiveness of a behavioral intervention for reducing HIV incidence. Project EXPLORE demonstrated that when tested against an evidence-based, effective control condition can result in reductions in rates of HIV acquisition at one year follow-up. Findings highlight the critical role of addressing behavioral risk reduction counseling in HIV prevention. PMID:23245226
When, not if: the inescapability of an uncertain climate future.
Ballard, Timothy; Lewandowsky, Stephan
2015-11-28
Climate change projections necessarily involve uncertainty. Analysis of the physics and mathematics of the climate system reveals that greater uncertainty about future temperature increases is nearly always associated with greater expected damages from climate change. In contrast to those normative constraints, uncertainty is frequently cited in public discourse as a reason to delay mitigative action. This failure to understand the actual implications of uncertainty may incur notable future costs. It is therefore important to communicate uncertainty in a way that improves people's understanding of climate change risks. We examined whether responses to projections were influenced by whether the projection emphasized uncertainty in the outcome or in its time of arrival. We presented participants with statements and graphs indicating projected increases in temperature, sea levels, ocean acidification and a decrease in arctic sea ice. In the uncertain-outcome condition, statements reported the upper and lower confidence bounds of the projected outcome at a fixed time point. In the uncertain time-of-arrival condition, statements reported the upper and lower confidence bounds of the projected time of arrival for a fixed outcome. Results suggested that people perceived the threat as more serious and were more likely to encourage mitigative action in the time-uncertain condition than in the outcome-uncertain condition. This finding has implications for effectively communicating the climate change risks to policy-makers and the general public. © 2015 The Author(s).
Framework for Automation of Hazard Log Management on Large Critical Projects
NASA Astrophysics Data System (ADS)
Vinerbi, Lorenzo; Babu, Arun P.
2016-08-01
Hazard log is a database of all risk management activities in a project. Maintaining its correctness and consistency on large safety/mission critical projects involving multiple vendors, suppliers, and partners is critical and challenging. IBM DOORS is one of the popular tool used for hazard management in space applications. However, not all stake- holders are familiar with it. Also, It is not always feasible to expect all stake-holders to provide correct and consistent hazard data.The current work describes the process and tools to simplify the process of hazard data collection on large projects. It demonstrates how the collected data from all stake-holders is merged to form the hazard log while ensuring data consistency and correctness.The data provided by all parties are collected using a template containing scripts. The scripts check for mistakes based on internal standards of company in charge of hazard management. The collected data is then subjected to merging in DOORS, which also contain scripts to check and import data to form the hazard log. The proposed tool has been applied to a mission critical project, and has been found to save time and reduce the number of mistakes while creating the hazard log. The use of automatic checks paves the way for correct tracking of risk and hazard analysis activities for large critical projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Salguero, Laura Marie; Huff, Johnathon; Matta, Anthony R.
Sandia National Laboratories is an organization with a wide range of research and development activities that include nuclear, explosives, and chemical hazards. In addition, Sandia has over 2000 labs and over 40 major test facilities, such as the Thermal Test Complex, the Lightning Test Facility, and the Rocket Sled Track. In order to support safe operations, Sandia has a diverse Environment, Safety, and Health (ES&H) organization that provides expertise to support engineers and scientists in performing work safely. With such a diverse organization to support, the ES&H program continuously seeks opportunities to improve the services provided for Sandia by usingmore » various methods as part of their risk management strategy. One of the methods being investigated is using enterprise architecture analysis to mitigate risk inducing characteristics such as normalization of deviance, organizational drift, and problems in information flow. This paper is a case study for how a Department of Defense Architecture Framework (DoDAF) model of the ES&H enterprise, including information technology applications, can be analyzed to understand the level of risk associated with the risk inducing characteristics discussed above. While the analysis is not complete, we provide proposed analysis methods that will be used for future research as the project progresses.« less
Munn, Zachary; Scarborough, Alan; Pearce, Susanne; McArthur, Alexa; Kavanagh, Sheila; Girdler, Michelle; Stefan-Rasmus, Bernie; Breen, Helen; Farquhar, Shirley; Li, Jessie; Hutchinson, Steven; Stephenson, Matthew; McBeth, Helen; Kitson, Alison
2015-09-16
Medication errors present a significant risk to patient safety. The "rights" of medication administration represent one approach to potentially reducing this risk. The aim of this project was to implement an evidence-based audit and feedback project to improve compliance with best practice in this area across a health network. A baseline audit was conducted to determine compliance with evidence-based standards by trained observers. The results of this audit were analysed and fed back to staff. An analysis of barriers to compliance was undertaken by key staff within the organization, which was followed by the implementation of targeted strategies to improve compliance. A follow-up audit was conducted and the results compared to the baseline audit. There were improvements in the percentage of compliance across all of the eight criteria audited, with statistically significant improvements found in six of the eight. In general, compliance with the criteria was high in both the baseline and follow-up audits. This audit and feedback implementation project was successful in increasing compliance and knowledge in this area and providing future direction for sustaining evidence-based practice change. It is now planned to use this approach for rolling out future implementation projects within this health system. The Joanna Briggs Institute.
Analyzing the contributions of a government-commissioned research project: a case study.
Hegger, Ingrid; Janssen, Susan W J; Keijsers, Jolanda F E M; Schuit, Albertine J; van Oers, Hans A M
2014-02-05
It often remains unclear to investigators how their research contributes to the work of the commissioner. We initiated the 'Risk Model' case study to gain insight into how a Dutch National Institute for Public Health and the Environment (RIVM) project and its knowledge products contribute to the commissioner's work, the commissioner being the Health Care Inspectorate. We aimed to identify the alignment efforts that influenced the research project contributions. Based on the literature, we expected interaction between investigators and key users to be the most determining factor for the contributions of a research project. In this qualitative case study, we analyzed the alignment efforts and contributions in the Risk Model project by means of document analysis and interviews according to the evaluation method Contribution Mapping. Furthermore, a map of the research process was drafted and a feedback session was organized. After the feedback session with stakeholders discussing the findings, we completed the case study report. Both organizations had divergent views on the ownership of the research product and the relationship between RIVM and the Inspectorate, which resulted in different expectations. The RIVM considered the use of the risk models to be problematic, but the inspectors had a positive opinion about its contributions. Investigators, inspectors, and managers were not aware of these remarkably different perceptions. In this research project, we identified six relevant categories of both horizontal alignment efforts (between investigators and key users) as well as vertical alignment efforts (within own organization) that influenced the contributions to the Inspectorate's work. Relevant alignment efforts influencing the contributions of the project became manifest at three levels: the first level directly relates to the project, the second to the organizational environment, and the third to the formal and historical relationship between the organizations. Both external and internal alignments influence the contributions of a research project. Based on the findings, we recommend that research institutes invest in a reflective attitude towards the social aspects of research projects at all levels of the organization and develop alignment strategies to enhance the contributions of research.
Analyzing the contributions of a government-commissioned research project: a case study
2014-01-01
Background It often remains unclear to investigators how their research contributes to the work of the commissioner. We initiated the ‘Risk Model’ case study to gain insight into how a Dutch National Institute for Public Health and the Environment (RIVM) project and its knowledge products contribute to the commissioner’s work, the commissioner being the Health Care Inspectorate. We aimed to identify the alignment efforts that influenced the research project contributions. Based on the literature, we expected interaction between investigators and key users to be the most determining factor for the contributions of a research project. Methods In this qualitative case study, we analyzed the alignment efforts and contributions in the Risk Model project by means of document analysis and interviews according to the evaluation method Contribution Mapping. Furthermore, a map of the research process was drafted and a feedback session was organized. After the feedback session with stakeholders discussing the findings, we completed the case study report. Results Both organizations had divergent views on the ownership of the research product and the relationship between RIVM and the Inspectorate, which resulted in different expectations. The RIVM considered the use of the risk models to be problematic, but the inspectors had a positive opinion about its contributions. Investigators, inspectors, and managers were not aware of these remarkably different perceptions. In this research project, we identified six relevant categories of both horizontal alignment efforts (between investigators and key users) as well as vertical alignment efforts (within own organization) that influenced the contributions to the Inspectorate’s work. Conclusions Relevant alignment efforts influencing the contributions of the project became manifest at three levels: the first level directly relates to the project, the second to the organizational environment, and the third to the formal and historical relationship between the organizations. Both external and internal alignments influence the contributions of a research project. Based on the findings, we recommend that research institutes invest in a reflective attitude towards the social aspects of research projects at all levels of the organization and develop alignment strategies to enhance the contributions of research. PMID:24498894
Managing Programmatic Risk for Complex Space System Developments
NASA Technical Reports Server (NTRS)
Panetta, Peter V.; Hastings, Daniel; Brumfield, Mark (Technical Monitor)
2001-01-01
Risk management strategies have become a recent important research topic to many aerospace organizations as they prepare to develop the revolutionary complex space systems of the future. Future multi-disciplinary complex space systems will make it absolutely essential for organizations to practice a rigorous, comprehensive risk management process, emphasizing thorough systems engineering principles to succeed. Project managers must possess strong leadership skills to direct high quality, cross-disciplinary teams for successfully developing revolutionary space systems that are ever increasing in complexity. Proactive efforts to reduce or eliminate risk throughout a project's lifecycle ideally must be practiced by all technical members in the organization. This paper discusses some of the risk management perspectives that were collected from senior managers and project managers of aerospace and aeronautical organizations by the use of interviews and surveys. Some of the programmatic risks which drive the success or failure of projects are revealed. Key findings lead to a number of insights for organizations to consider for proactively approaching the risks which face current and future complex space systems projects.
A methodology for the assessment of flood hazards at the regional scale
NASA Astrophysics Data System (ADS)
Gallina, Valentina; Torresan, Silvia; Critto, Andrea; Zabeo, Alex; Semenzin, Elena; Marcomini, Antonio
2013-04-01
In recent years, the frequency of water-related disasters has increased and recent flood events in Europe (e.g. 2002 in Central Europe, 2007 in UK, 2010 in Italy) caused physical-environmental and socio-economic damages. Specifically, floods are the most threatening water-related disaster that affects humans, their lives and properties. Within the KULTURisk project (FP7) a Regional Risk Assessment (RRA) methodology is proposed to evaluate the benefits of risk prevention in terms of reduced environmental risks due to floods. The method is based on the KULTURisk framework and allows the identification and prioritization of targets (i.e. people, buildings, infrastructures, agriculture, natural and semi-natural systems, cultural heritages) and areas at risk from floods in the considered region by comparing the baseline scenario (i.e. current state) with alternative scenarios (i.e. where different structural and/or non-structural measures are planned). The RRA methodology is flexible and can be adapted to different case studies (i.e. large rivers, alpine/mountain catchments, urban areas and coastal areas) and spatial scales (i.e. from the large river to the urban scale). The final aim of RRA is to help decision-makers in examining the possible environmental risks associated with uncertain future flood hazards and in identifying which prevention scenario could be the most suitable one. The RRA methodology employs Multi-Criteria Decision Analysis (MCDA functions) in order to integrate stakeholder preferences and experts judgments into the analysis. Moreover, Geographic Information Systems (GISs) are used to manage, process, analyze, and map data to facilitate the analysis and the information sharing with different experts and stakeholders. In order to characterize flood risks, the proposed methodology integrates the output of hydrodynamic models with the analysis of site-specific bio-geophysical and socio-economic indicators (e.g. slope of the territory, land cover, population density, economic activities) of several case studies in order to develop risk maps that identify and prioritize relative hot-spot areas and targets at risk at the regional scale. The main outputs of the RRA are receptor-based maps of risks useful to communicate the potential implications of floods in non-monetary terms to stakeholders and administrations. These maps can be a basis for the management of flood risks as they can provide information about the indicative number of inhabitants, the type of economic activities, natural systems and cultural heritages potentially affected by flooding. Moreover, they can provide suitable information about flood risk in the considered area in order to define priorities for prevention measures, for land use planning and management. Finally, the outputs of the RRA methodology can be used as data input in the Socio- Economic Regional Risk Assessment methodology for the economic evaluation of different damages (e.g. tangible costs, intangible costs) and for the social assessment considering the benefits of the human dimension of vulnerability (i.e. adaptive and coping capacity). Within the KULTURisk project, the methodology has been applied and validated in several European case studies. Moreover, its generalization to address other types of natural hazards (e.g. earthquakes, forest fires) will be evaluated. The preliminary results of the RRA application in the KULTURisk project will be here presented and discussed.
NASA Astrophysics Data System (ADS)
Shepherd, Curt; Grimsrud, Kristine; Berrens, Robert P.
2009-10-01
The accumulation of fire fuels in forests throughout the world contributes significantly to the severity of wildfires. To combat the threat of wildfire, especially in the wildland-urban interface (WUI), US federal land management agencies have implemented a number of forest restoration and wildfire risk reduction programs. In the spirit of revealed preference analyses, the objective of this study is to investigate the pattern and determinants of National Fire Plan (NFP) expenditures for fuel reduction treatments in northern New Mexico (USA). Estimation results from a set of Generalized Estimating Equations models are mixed with respect to risk reduction hypotheses, and also raise issues regarding how risk reduction should be defined for a region characterized by both pockets of urban sprawl into the WUI and large areas of chronic rural poverty. Program preferences for project funding under the federal Collaborative Forest Restoration Program in New Mexico are shown to be distinctly different (e.g., exhibiting greater concern for social equity) than for other NFP-funded projects.
Improving the Accuracy of Estimation of Climate Extremes
NASA Astrophysics Data System (ADS)
Zolina, Olga; Detemmerman, Valery; Trenberth, Kevin E.
2010-12-01
Workshop on Metrics and Methodologies of Estimation of Extreme Climate Events; Paris, France, 27-29 September 2010; Climate projections point toward more frequent and intense weather and climate extremes such as heat waves, droughts, and floods, in a warmer climate. These projections, together with recent extreme climate events, including flooding in Pakistan and the heat wave and wildfires in Russia, highlight the need for improved risk assessments to help decision makers and the public. But accurate analysis and prediction of risk of extreme climate events require new methodologies and information from diverse disciplines. A recent workshop sponsored by the World Climate Research Programme (WCRP) and hosted at United Nations Educational, Scientific and Cultural Organization (UNESCO) headquarters in France brought together, for the first time, a unique mix of climatologists, statisticians, meteorologists, oceanographers, social scientists, and risk managers (such as those from insurance companies) who sought ways to improve scientists' ability to characterize and predict climate extremes in a changing climate.
Nair, Sreekumaran; Lewis, Leslie Edward; Godinho, Myron Anthony; Murthy, Shruti; Lakiang, Theophilus; Venkatesh, Bhumika T
2018-01-01
Introduction India accounts for more neonatal deaths than any other country. There is a lack of consolidated evidence from India regarding the determining factors of pneumonia in neonates. This systematic review is aimed to consolidate and appraise the evidence on risk factors and determinants of pneumonia among neonates in India. Methods and analysis This protocol is part of a project consisting of three reviews (two systematic reviews and one scoping review) and a qualitative study on neonatal pneumonia in India. English language observational studies which report risk factors and determinants of neonatal pneumonia in India will be eligible for inclusion. Electronic searching of nine databases, and hand searching will be done. Two authors will independently conduct screening (title, abstract and full-text stages), extract data and assess risk of bias. A meta-analysis is planned to be performed with random-effects model. A narrative synthesis will be used to summarise the characteristics and findings of the review, if a meta-analysis cannot be performed. If there are more than 10 studies, publication bias will be assessed. Sensitivity and subgroup analysis will performed based on data availability. The quality of our review will be assessed by using ‘Assessing the Methodological quality of Systematic Reviews’ and ‘Grades of Recommendation, Assessment, Development and Evaluation’. Ethics and dissemination The protocol of the entire project has been approved by the host institution’s ethics body (Institutional Ethics Committee, Manipal University, Manipal, India), and the ‘Health Ministry Screening Committee’ under the Ministry of Health and Family Welfare, Government of India. The study findings will be disseminated among relevant stakeholders using knowledge dissemination workshops, policy briefs, publications, etc. PROSPERO registration number CRD42016044019. PMID:29326186
Demetrovics, Zsolt; Király, Orsolya; Koronczai, Beatrix; Griffiths, Mark D; Nagygyörgy, Katalin; Elekes, Zsuzsanna; Tamás, Domokos; Kun, Bernadette; Kökönyei, Gyöngyi; Urbán, Róbert
2016-01-01
Despite the large number of measurement tools developed to assess problematic Internet use, numerous studies use measures with only modest investigation into their psychometric properties. The goal of the present study was to validate the short (6-item) version of the Problematic Internet Use Questionnaire (PIUQ) on a nationally representative adolescent sample (n = 5,005; mean age 16.4 years, SD = 0.87) and to determine a statistically established cut-off value. Data were collected within the framework of the European School Survey Project on Alcohol and Other Drugs project. Results showed an acceptable fit of the original three-factor structure to the data. In addition, a MIMIC model was carried out to justify the need for three distinct factors. The sample was divided into users at-risk of problematic Internet use and those with no-risk using a latent profile analysis. Two latent classes were obtained with 14.4% of adolescents belonging to the at-risk group. Concurrent and convergent validity were tested by comparing the two groups across a number of variables (i.e., time spent online, academic achievement, self-esteem, depressive symptoms, and preferred online activities). Using the at-risk latent profile analysis class as the gold standard, a cut-off value of 15 (out of 30) was suggested based on sensitivity and specificity analyses. In conclusion, the brief version of the (6-item) PIUQ also appears to be an appropriate measure to differentiate between Internet users at risk of developing problematic Internet use and those not at risk. Furthermore, due to its brevity, the shortened PIUQ is advantageous to utilize within large-scale surveys assessing many different behaviors and/or constructs by reducing the overall number of survey questions, and as a consequence, likely increasing completion rates.
Climate change induced risk analysis of Dar es Salaam city (Tanzania)
NASA Astrophysics Data System (ADS)
Topa, Maria Elena; Herslund, Lise; Cavan, Gina; Printz, Andreas; Simonis, Ingo; Bucchignani, Edoardo; Jean-Baptiste, Nathalie; Hellevik, Siri; Johns, Regina; Kibassa, Deusdedit; Kweka, Clara; Magina, Fredrick; Mangula, Alpha; Mbuya, Elinorata; Uhinga, Guido; Kassenga, Gabriel; Kyessi, Alphonce; Shemdoe, Riziki; Kombe, Wilbard
2013-04-01
CLUVA (CLimate change and Urban Vulnerability in Africa; http://www.cluva.eu/) is a 3 years project, funded by the European Commission in 2010. The main objective of CLUVA is to develop context-centered methods and knowledge to be applied to African cities to assess vulnerabilities and increase knowledge on managing climate related risks. The project estimates the impacts of climate changes in the next 40 years at urban scale and downscales IPCC climate projections to evaluate specific threats to selected African test cities. These are mainly from floods, sea-level rise, droughts, heat waves, and desertification. The project evaluates and links: social vulnerability; urban green structures and ecosystem services; urban-rural interfaces; vulnerability of urban built environment and lifelines; and related institutional and governance dimensions of adaptation. The multi-scale and multi-disciplinary qualitative, quantitative and probabilistic approach of CLUVA is currently being applied to selected African test cities (Addis Ababa - Ethiopia; Dar es Salaam - Tanzania; Douala - Cameroun; Ouagadougou - Burkina Faso; St. Louis - Senegal). In particular, the poster will present preliminary findings for the Dar es Salaam case study. Dar es Salaam, which is Tanzania's largest coastal city, is exposed to floods, coastal erosion, droughts and heat waves, and highly vulnerable to impacts as a result of ineffective urban planning (about 70% unplanned settlements), poverty and lack of basic infrastructure (e.g. lack of or poor quality storm water drainage systems). Climate change could exacerbate the current situation increasing hazard-exposure alongside the impacts of development pressures which act to increase urban vulnerability for example because of informal (unregulated) urbanization. The CLUVA research team - composed of climate and environmental scientists, risk management experts, urban planners and social scientists from both European and African institutions - has started to produce research outputs suitable for use in evidence-based planning activities in the case study cities through interdisciplinary methods and analysis. Climate change projections at 8 km resolution are ready for regions containing each of the case study cities; a preliminary hazard assessment for floods, droughts and heat waves has been performed, based on historical data; urban morphology and related green structures have been characterized; preliminary findings in social vulnerability provide insights how communities and households can resist and cope with, as well as recover from climate induced hazards; vulnerability of informal settlements to floods has been assessed for a case study area (Suna sub ward) and a GIS based identification of urban residential hotspots to flooding is completed. Furthermore, a set of indicators has been identified and the most relevant for Dar es Salaam has been selected by local stakeholders to identify particular vulnerable high risk areas and communities. An investigation of the existing urban planning and governance system and its interface with climate risks and vulnerability has inter-alia suggested severe institutional deficits including over-centralized institutions for disaster risk management and climate change adaptation. A multi-risk framework considering climate-related hazards, and physical and social fragilities has been set up.
An analysis of European riverine flood risk and adaptation measures under projected climate change
NASA Astrophysics Data System (ADS)
Bouwer, Laurens; Burzel, Andreas; Holz, Friederike; Winsemius, Hessel; de Bruijn, Karind
2015-04-01
There is increasing need to assess costs and benefits of adaptation at scales beyond the river basin. In Europe, such estimates are required at the European scale in order to set priorities for action and financing, for instance in the context of the EU Adaptation Strategy. The goal of this work as part of the FP7 BASE project is to develop a flood impact model that can be applied at Pan-European scale and that is able to project changes in flood risk due to climate change and socio-economic developments, and costs of adaptation. For this research, we build upon the global flood hazard estimation method developed by Winsemius et al. (Hydrology and Earth System Sciences, 2013), that produces flood inundation maps at different return period, for present day (EU WATCH) and future climate (IPCC scenarios RCP4.5 and 8.5, for five climate models). These maps are used for the assessment of flood impacts. We developed and tested a model for assessing direct economic flood damages by using large scale land use maps. We characterise vulnerable land use functions, in particular residential, commercial, industrial, infrastructure and agriculture, using depth-damage relationships. Furthermore, we apply up to NUTS3 level information on Gross Domestic Product, which is used as a proxy for relative differences in maximum damage values between different areas. Next, we test two adaptation measures, by adjusting flood protection levels and adjusting damage functions. The results show the projected changes in flood risk in the future. For example, on NUTS2 level, flood risk increases in some regions up to 179% (between the baseline scenario 1960-1999 and time slice 2010-2049). On country level there are increases up to 60% for selected climate models. The conference presentation will show the most relevant improvements in damage modelling on the continental scale, and results of the analysis of adaptation measures. The results will be critically discussed under the aspect of major uncertainties in both future flood hazards as well as damage costs and adaptation effects and costs.
Risk of Contractors’ Claims On the Example of Road Works
NASA Astrophysics Data System (ADS)
Rybka, Iwona; Bondar-Nowakowska, Elżbieta; Pawluk, Katarzyna; Połoński, Mieczysław
2017-10-01
The aim of the study is to analyse claims filed by building contractors during the project implementation. The work is divided into two parts. In the first part problems associated with the management of claims in the construction process were discussed. Bearing in mind that claims may result in prolongation of the investment or exceeding planned budget, possibilities of applying information included in documents connected with claims procedure to risk management was analysed in the second part of the study. The basis of the analysis is a review of 226 documents. They originate from 8 construction sites completed in the last 5 years in southwestern Poland. In each case, these were linear road projects, executed by different contractors, according to conditions in the contract set out in the “Yellow Book” FIDIC. In the study, other documents relating events that according to contractors entitled them to claim were also analysed. They included among others: project documentation, terms of reference, construction log, reports and correspondence under the contract. The events constituting the reason for contractors` claims were classified according to their sources. 8 areas of potential threats were distinguished. They were presented in the form of a block diagram. Most events initiating the claims were reported in the following group - adverse actions of third parties, while the fewest were recorded in the group - the lack of access to the construction site. Based on calculated similarity indicators it was found that considered construction sites were diversified in terms of the number of the events occurrence that generated the claim and their sources. In recent years, many road projects are completed behind the schedule and their initially planned budgets are significantly exceeded. Conducted research indicated that data derived from the analysis of documents connected with claims can be applied to identify and classify both cost and schedule risk factors. Obtained data can also be useful at the stage of risk control because early diagnosis of threats in relation to technical and organizational aspects is necessary to take effective action.
Li, Chunhui; Sun, Lian; Jia, Junxiang; Cai, Yanpeng; Wang, Xuan
2016-07-01
Source water areas are facing many potential water pollution risks. Risk assessment is an effective method to evaluate such risks. In this paper an integrated model based on k-means clustering analysis and set pair analysis was established aiming at evaluating the risks associated with water pollution in source water areas, in which the weights of indicators were determined through the entropy weight method. Then the proposed model was applied to assess water pollution risks in the region of Shiyan in which China's key source water area Danjiangkou Reservoir for the water source of the middle route of South-to-North Water Diversion Project is located. The results showed that eleven sources with relative high risk value were identified. At the regional scale, Shiyan City and Danjiangkou City would have a high risk value in term of the industrial discharge. Comparatively, Danjiangkou City and Yunxian County would have a high risk value in terms of agricultural pollution. Overall, the risk values of north regions close to the main stream and reservoir of the region of Shiyan were higher than that in the south. The results of risk level indicated that five sources were in lower risk level (i.e., level II), two in moderate risk level (i.e., level III), one in higher risk level (i.e., level IV) and three in highest risk level (i.e., level V). Also risks of industrial discharge are higher than that of the agricultural sector. It is thus essential to manage the pillar industry of the region of Shiyan and certain agricultural companies in the vicinity of the reservoir to reduce water pollution risks of source water areas. Copyright © 2016 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bloom, R.R.
1996-04-01
The objective of this report is to demonstrate that a thorough assessment of the risks associated with the operation of the Rust Geotech patented VAC*TRAX mobile treatment unit (MTU) has been performed and documented. The MTU was developed to treat mixed wastes at the US Department of Energy (DOE) Albuquerque Operations Office sites. The MTU uses an indirectly heated, batch vacuum dryer to thermally desorb organic compounds from mixed wastes. This process hazards analysis evaluated 102 potential hazards. The three significant hazards identified involved the inclusion of oxygen in a process that also included an ignition source and fuel. Changesmore » to the design of the MTU were made concurrent with the hazard identification and analysis; all hazards with initial risk rankings of 1 or 2 were reduced to acceptable risk rankings of 3 or 4. The overall risk to any population group from operation of the MTU was determined to be very low; the MTU is classified as a Radiological Facility with low hazards.« less
Managing Risk and Uncertainty in Large-Scale University Research Projects
ERIC Educational Resources Information Center
Moore, Sharlissa; Shangraw, R. F., Jr.
2011-01-01
Both publicly and privately funded research projects managed by universities are growing in size and scope. Complex, large-scale projects (over $50 million) pose new management challenges and risks for universities. This paper explores the relationship between project success and a variety of factors in large-scale university projects. First, we…
Evaluating Effects of Stressors from Marine and Hydrokinetic Energy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Copping, Andrea E.; Blake, Kara M.; Hanna, Luke A.
2012-09-30
Potential environmental effects of marine and hydrokinetic (MHK) energy development are not well understood, yet regulatory agencies are required to make decisions in spite of substantial uncertainty about environmental impacts and their long-term consequences. An understanding of risks associated with interactions between MHK installations and aquatic receptors, including animals, habitats, and ecosystems, can help define key uncertainties and focus regulatory actions and scientific studies on interactions of most concern. During FY 2012, Pacific Northwest National Laboratory (PNNL) continued to follow project developments on the two marine and hydrokinetic projects reviewed for Environmental Risk Evaluation System (ERES) screening analysis in FYmore » 2011: a tidal project in the Gulf of Maine using Ocean Renewable Power Company TidGenTM turbines and a wave project planned for the coast of Oregon using Aquamarine Oyster surge devices. The ERES project in FY 2012 also examined two stressor–receptor interactions previously identified through the screening process as being of high importance: 1) the toxicity effects of antifouling coatings on MHK devices on aquatic resources and 2) the risk of a physical strike encounter between an adult killer whale and an OpenHydro turbine blade. The screening-level assessment of antifouling paints and coatings was conducted for two case studies: the Snohomish County Public Utility District No. 1 (SnoPUD) tidal turbine energy project in Admiralty Inlet, Puget Sound, Washington, and the Ocean Power Technologies (OPT) wave buoy project in Reedsport, Oregon. Results suggest minimal risk to aquatic biota from antifouling coatings used on MHK devices deployed in large estuaries or open ocean environments. For the strike assessment of a Southern Resident Killer Whale (SRKW) encountering an OpenHydro tidal turbine blade, PNNL teamed with colleagues from Sandia National Laboratories (SNL) to carry out an analysis of the mechanics and biological consequences of different blade strike scenarios. Results of these analyses found the following: 1) a SRKW is not likely to experience significant tissue injury from impact by an OpenHydro turbine blade; and 2) if whale skin behaves similarly to the materials considered as surrogates for the upper dermal layers of whale skin, it would not be torn by an OpenHydro blade strike. The PNNL/SNL analyses could not provide insight into the potential for more subtle changes to SRKWs from an encounter with a turbine, such as changes in behavior, or inform turbine interactions for other whales or other turbines. These analyses were limited by the available time frame in which results were needed and focused on the mechanical response of whale tissues and bone to blade strike. PNNL proposes that analyses of additional turbine designs and interactions with other marine mammals that differ in size, body conformation, and mass be performed.« less
The Systems Engineering Process for Human Support Technology Development
NASA Technical Reports Server (NTRS)
Jones, Harry
2005-01-01
Systems engineering is designing and optimizing systems. This paper reviews the systems engineering process and indicates how it can be applied in the development of advanced human support systems. Systems engineering develops the performance requirements, subsystem specifications, and detailed designs needed to construct a desired system. Systems design is difficult, requiring both art and science and balancing human and technical considerations. The essential systems engineering activity is trading off and compromising between competing objectives such as performance and cost, schedule and risk. Systems engineering is not a complete independent process. It usually supports a system development project. This review emphasizes the NASA project management process as described in NASA Procedural Requirement (NPR) 7120.5B. The process is a top down phased approach that includes the most fundamental activities of systems engineering - requirements definition, systems analysis, and design. NPR 7120.5B also requires projects to perform the engineering analyses needed to ensure that the system will operate correctly with regard to reliability, safety, risk, cost, and human factors. We review the system development project process, the standard systems engineering design methodology, and some of the specialized systems analysis techniques. We will discuss how they could apply to advanced human support systems development. The purpose of advanced systems development is not directly to supply human space flight hardware, but rather to provide superior candidate systems that will be selected for implementation by future missions. The most direct application of systems engineering is in guiding the development of prototype and flight experiment hardware. However, anticipatory systems engineering of possible future flight systems would be useful in identifying the most promising development projects.
Complexity analysis of the cost effectiveness of PI-led NASA science missions
NASA Astrophysics Data System (ADS)
Yoshida, J.; Cowdin, M.; Mize, T.; Kellogg, R.; Bearden, D.
For the last 20 years, NASA has allowed Principal Investigators (PIs) to manage the development of many unmanned space projects. Advocates of PI-led projects believe that a PI-led implementation can result in a project being developed at lower cost and shorter schedule than other implementation modes. This paper seeks to test this hypothesis by comparing the actual costs of NASA and other comparable projects developed under different implementation modes. The Aerospace Corporation's Complexity-Based Risk Assessment (CoBRA) analysis tool is used to normalize the projects such that the cost can be compared for equivalent project complexities. The data is examined both by complexity and by launch year. Cost growth will also be examined for any correlation with implementation mode. Defined in many NASA Announcements of Opportunity (AOs), a PI-led project is characterized by a central, single person with full responsibility for assembling a team and for the project's scientific integrity and the implementation and integrity of all other aspects of the mission, while operating under a cost cap. PIs have larger degrees of freedom to achieve the stated goals within NASA guidelines and oversight. This study leverages the definitions and results of previous National Research Council studies of PI-led projects. Aerospace has defined a complexity index, derived from mission performance, mass, power, and technology choices, to arrive at a broad representation of missions for purposes of comparison. Over a decade of research has established a correlation between mission complexity and spacecraft development cost and schedule. This complexity analysis, CoBRA, is applied to compare a PI-led set of New Frontiers, Discovery, Explorers, and Earth System Science Pathfinder missions to the overall NASA mission dataset. This reveals the complexity trends against development costs, cost growth, and development era.
Environmental Biosciences Program Quarterly Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lawrence C. Mohr, M.D.
2009-01-30
Current research projects have focused Environmental Biosciences Program (EBP) talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene, low-dose ionizing radiation (gamma and neutron) and alpha radiation from plutonium. Trichloroethylene research has been conducted as a joint collaborative effort with the University of Georgia. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the United States Department of Energy (DOE). Laboratory work has been completed on severalmore » trichloroethylene risk assessment projects, and these projects have been brought to a close. Plans for restructuring the performance schedule of the remaining trichloroethylene projects have been submitted to the department. A comprehensive manuscript on the scientific basis of trichloroethylene risk assessment is in preparation. Work on the low-dose radiation risk assessment projects is also progressing at a slowed rate as a result of funding uncertainties. It has been necessary to restructure the proponency and performance schedule of these projects, with the project on Low-Dose Radiation: Epidemiology Risk Models transferred to DOE Office of Science proponency under a separate funding instrument. Research on this project will continue under the provisions of the DOE Office of Science funding instrument, with progress reported in accordance with the requirements of that funding instrument. Progress on that project will no longer be reported in quarterly reports for DE-FC09-02CH11109. Following a meeting at the Savannah River Site on May 8, 2008, a plan was submitted for development of an epidemiological cohort study and prospective medical surveillance system for the assessment of disease rates among workers at the Savannah River Site (SRS). This project will be incorporated into the ongoing project on Population Health Risks in the Vicinity of the Savannah River Site. During a meeting at the SRS on October 21, 2008, a presentation was made on EBP participation in the development and operation of an Epidemiology Consortium at the SRS. A follow-up meeting with SRS officials is planned for 29 and 30 January 2009 at Medical University of South Carolina (MUSC).An epidemiology project on population health risk assessment is being conducted to assess health risks among populations in the vicinity of the SRS. This project is using the capabilities of the EBP GIS for the geographical assessment of cancer and non-cancer disease rates, as well as the potential association of population health risks with environmental exposures. Although funding uncertainties have slowed progress on some aspects of this project, it has not been necessary to restructure the performance schedule to date.« less
Makrides, Lydia; Smith, Steven; Allt, Jane; Farquharson, Jane; Szpilfogel, Claudine; Curwin, Sandra; Veinot, Paula; Wang, Feifei; Edington, Dee
2011-07-01
To examine the relationship between health risks and absenteeism and drug costs vis-a-vis comprehensive workplace wellness. Eleven health risks, and change in drug claims, short-term and general illness calculated across four risk change groups. Wellness score examined using Wilcoxon test and regression model for cost change. The results showed 31% at risk; 9 of 11 risks associated with higher drug costs. Employees moving from low to high risk showed highest relative increase (81%) in drug costs; moving from high to low had lowest (24%). Low-high had highest increase in absenteeism costs (160%). With each risk increase, absenteeism costs increased by $CDN248 per year (P < 0.05) with average decrease of 0.07 risk factors and savings $CDN6979 per year. Both high-risk reduction and low-risk maintenance are important to contain drug costs. Only low-risk maintenance also avoids absenteeism costs associated with high risks.
Sustainable Mining Land Use for Lignite Based Energy Projects
NASA Astrophysics Data System (ADS)
Dudek, Michal; Krysa, Zbigniew
2017-12-01
This research aims to discuss complex lignite based energy projects economic viability and its impact on sustainable land use with respect to project risk and uncertainty, economics, optimisation (e.g. Lerchs and Grossmann) and importance of lignite as fuel that may be expressed in situ as deposit of energy. Sensitivity analysis and simulation consist of estimated variable land acquisition costs, geostatistics, 3D deposit block modelling, electricity price considered as project product price, power station efficiency and power station lignite processing unit cost, CO2 allowance costs, mining unit cost and also lignite availability treated as lignite reserves kriging estimation error. Investigated parameters have nonlinear influence on results so that economically viable amount of lignite in optimal pit varies having also nonlinear impact on land area required for mining operation.
Modeling Research Project Risks with Fuzzy Maps
ERIC Educational Resources Information Center
Bodea, Constanta Nicoleta; Dascalu, Mariana Iuliana
2009-01-01
The authors propose a risks evaluation model for research projects. The model is based on fuzzy inference. The knowledge base for fuzzy process is built with a causal and cognitive map of risks. The map was especially developed for research projects, taken into account their typical lifecycle. The model was applied to an e-testing research…
William Elliot; Ina Sue Miller; Brandon Glaza
2007-01-01
A limited erosion potential analysis was carried out on the 50,000 acre School Fire. Three WEPP interfaces were used for the analysis, a GIS wizard, an online interface and a windows interface. Ten watersheds within the fire area were modeled with the GeoWEPP tool (a geo-spatial interface for WEPP, Water Erosion Predication Project). The watersheds covered 18,823 acres...
Useful Life Prediction for Payload Carrier Hardware
NASA Technical Reports Server (NTRS)
Ben-Arieh, David
2002-01-01
The Space Shuttle has been identified for use through 2020. Payload carrier systems will be needed to support missions through the same time frame. To support the future decision making process with reliable systems, it is necessary to analyze design integrity, identify possible sources of undesirable risk and recognize required upgrades for carrier systems. This project analyzed the information available regarding the carriers and developed the probability of becoming obsolete under different scenarios. In addition, this project resulted in a plan for an improved information system that will improve monitoring and control of the various carriers. The information collected throughout this project is presented in this report as process flow, historical records, and statistical analysis.
Biomonitoring data can help inform the development and calibration of high-throughput exposure modeling for use in prioritization and risk evaluation. A pilot project was conducted to evaluate the feasibility of using pooled banked blood samples to generate initial data on popul...
Gale, C P; Manda, S O M; Batin, P D; Weston, C F; Birkhead, J S; Hall, A S
2008-11-01
Although early thrombolysis reduces the risk of death in STEMI patients, mortality remains high. We evaluated factors predicting inpatient mortality for patients with STEMI in a "real-world" population. Analysis of the Myocardial Infarction National Audit Project (MINAP) database using multivariate logistic regression and area under the receiver operating curve analysis. All acute hospitals in England and Wales. 34 722 patients with STEMI from 1 January 2003 to 31 March 2005. Inpatient mortality was 10.6%. The highest odds ratios for inpatient survival were aspirin therapy given acutely and out-of-hospital thrombolysis, independently associated with a mortality risk reduction of over half. A 10-year increase in age doubled inpatient mortality risk, whereas cerebrovascular disease increased it by 1.7. The risk model comprised 14 predictors of mortality, C index = 0.82 (95% CI 0.82 to 0.83, p<0.001). A simple model comprising age, systolic blood pressure (SBP) and heart rate (HR) offered a C index of 0.80 (0.79 to 0.80, p<0.001). The strongest predictors of in-hospital survival for STEMI were aspirin therapy given acutely and out-of-hospital thrombolysis, Previous STEMI models have focused on age, SBP and HR We have confirmed the importance of these predictors in the discrimination of death after STEMI, but also demonstrated that other potentially modifiable variables impact upon the prediction of short-term mortality.
NASA Astrophysics Data System (ADS)
Stephenne, N.; Beaumont, B.; Hallot, E.; Lenartz, F.; Lefebre, F.; Lauwaet, D.; Poelmans, L.; Wolff, E.
2017-05-01
Risk situation can be mitigated by prevention measures, early warning tools and adequate monitoring of past experiences where Earth Observation and geospatial analysis have an adding value. This paper discusses the potential use of Earth Observation data and especially Land Cover / Land Use map in addressing within the three aspects of the risk assessment: danger, exposure and vulnerability. Evidences of the harmful effects of air pollution or heat waves are widely admitted and should increase in the context of global warming. Moreover, urban areas are generally warmer than rural surroundings, the so-called urban heat island. Combined with in-situ measurements, this paper presents models of city or local climate (air pollution and urban heat island), with a resolution of less than one kilometer, developed by integrating several sources of information including Earth Observation data and in particular Land Cover / Land Use. This assessment of the danger is then be related to a map of exposure and vulnerable people. Using dasymetric method to disaggregate statistical information on Land Cover / Land Use data, the SmartPop project analyzes in parallel the map of danger with the maps of people exposure A special focus on some categories at risk such as the elderly has been proposed by Aubrecht and Ozceylan (2013). Perspectives of the project includes the integration of a new Land Cover / Land Use map in the danger, exposure and vulnerability models and proposition of several aspects of risk assessment with the stakeholders of Wallonia.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Langner, R.; Hendron, B.; Bonnema, E.
2014-08-01
The small buildings and small portfolios (SBSP) sector face a number of barriers that inhibit SBSP owners from adopting energy efficiency solutions. This pilot project focused on overcoming two of the largest barriers to financing energy efficiency in small buildings: disproportionately high transaction costs and unknown or unacceptable risk. Solutions to these barriers can often be at odds, because inexpensive turnkey solutions are often not sufficiently tailored to the unique circumstances of each building, reducing confidence that the expected energy savings will be achieved. To address these barriers, NREL worked with two innovative, forward-thinking lead partners, Michigan Saves and Energi,more » to develop technical solutions that provide a quick and easy process to encourage energy efficiency investments while managing risk. The pilot project was broken into two stages: the first stage focused on reducing transaction costs, and the second stage focused on reducing performance risk. In the first stage, NREL worked with the non-profit organization, Michigan Saves, to analyze the effects of 8 energy efficiency measures (EEMs) on 81 different baseline small office building models in Holland, Michigan (climate zone 5A). The results of this analysis (totaling over 30,000 cases) are summarized in a simple spreadsheet tool that enables users to easily sort through the results and find appropriate small office EEM packages that meet a particular energy savings threshold and are likely to be cost-effective.« less
NASA Astrophysics Data System (ADS)
Gädeke, Anne; Gusyev, Maksym; Magome, Jun; Sugiura, Ai; Cullmann, Johannes; Takeuchi, Kuniyoshi
2015-04-01
The global flood risk assessment is prerequisite to set global measurable targets of post-Hyogo Framework for Action (HFA) that mobilize international cooperation and national coordination towards disaster risk reduction (DRR) and requires the establishment of a uniform flood risk assessment methodology on various scales. To address these issues, the International Flood Initiative (IFI) has initiated a Flagship Project, which was launched in year 2013, to support flood risk reduction benchmarking at global, national and local levels. In the Flagship Project road map, it is planned to identify the original risk (1), to identify the reduced risk (2), and to facilitate the risk reduction actions (3). In order to achieve this goal at global, regional and local scales, international research collaboration is absolutely necessary involving domestic and international institutes, academia and research networks such as UNESCO International Centres. The joint collaboration by ICHARM and BfG was the first attempt that produced the first step (1a) results on the flood discharge estimates with inundation maps under way. As a result of this collaboration, we demonstrate the outcomes of the first step of the IFI Flagship Project to identify flood hazard in the Rhine river basin on the global and local scale. In our assessment, we utilized a distributed hydrological Block-wise TOP (BTOP) model on 20-km and 0.5-km scales with local precipitation and temperature input data between 1980 and 2004. We utilized existing 20-km BTOP model, which is applied globally, and constructed the local scale 0.5-km BTOP model for the Rhine River basin. For the BTOP model results, both calibrated 20-km and 0.5-km BTOP models had similar statistical performance and represented observed flood river discharges, epecially for 1993 and 1995 floods. From 20-km and 0.5-km BTOP simulation, the flood discharges of the selected return period were estimated using flood frequency analysis and were comparable to the the river gauging station data at the German part of the Rhine river basin. This is an important finding that both 0.5-km and 20-km BTOP models produce similar flood peak discharges although the 0.5-km BTOP model results indicate the importance of scale in the local flood hazard assessment. In summary, we highlight that this study serves as a demonstrative example of institutional collaboration and is stepping stone for the next step implementation of the IFI Flagship Project.
Horodynski, Mildred A; Brophy-Herb, Holly E; Martoccio, Tiffany L; Contreras, Dawn; Peterson, Karen; Shattuck, Mackenzie; Senehi, Neda; Favreau, Zachary; Miller, Alison L; Sturza, Julie; Kaciroti, Niko; Lumeng, Julie C
2018-04-01
Early child weight gain predicts adolescent and adult obesity, underscoring the need to determine early risk factors affecting weight status and how risk factors might be mitigated. Socioeconomic status, food insecurity, caregiver depressive symptomology, single parenthood, and dysfunctional parenting each have been linked to early childhood weight status. However, the associations between these risk factors and children's weight status may be moderated by caregiver feeding styles (CFS). Examining modifiable factors buffering risk could provide key information to guide early obesity intervention efforts. This analysis used baseline data from the Growing Healthy project that recruited caregivers/child dyads (N = 626) from Michigan Head Start programs. Caregivers were primarily non-Hispanic white (62%) and African American (30%). After using latent class analysis to identify classes of familial psychosocial risk, CFS was tested as a moderator of the association between familial psychosocial risk class and child body mass index (BMI) z-score. Latent class analysis identified three familial psychosocial risk classes: (1) poor, food insecure and depressed families; (2) poor, single parent families; and (3) low risk families. Interactive effects for uninvolved feeding styles and risk group indicated that children in poor, food insecure, and depressed families had higher BMI z-scores compared to children in the low risk group. Authoritative feeding styles in low risk and poor, food insecure, and depressed families showed lower child BMI z-scores relative to poor, single parent families with authoritative feeding styles. Uninvolved feeding styles intensified the risk and an authoritative feeding style muted the risk conferred by living in a poor, food-insecure, and depressed family. Interventions that promote responsive feeding practices could help decrease the associations of familial psychosocial risks with early child weight outcomes. Copyright © 2017 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Amin, Asad; Nasim, Wajid; Mubeen, Muhammad; Kazmi, Dildar Hussain; Lin, Zhaohui; Wahid, Abdul; Sultana, Syeda Refat; Gibbs, Jim; Fahad, Shah
2017-09-01
Unpredictable precipitation trends have largely influenced by climate change which prolonged droughts or floods in South Asia. Statistical analysis of monthly, seasonal, and annual precipitation trend carried out for different temporal (1996-2015 and 2041-2060) and spatial scale (39 meteorological stations) in Pakistan. Statistical downscaling model (SimCLIM) was used for future precipitation projection (2041-2060) and analyzed by statistical approach. Ensemble approach combined with representative concentration pathways (RCPs) at medium level used for future projections. The magnitude and slop of trends were derived by applying Mann-Kendal and Sen's slop statistical approaches. Geo-statistical application used to generate precipitation trend maps. Comparison of base and projected precipitation by statistical analysis represented by maps and graphical visualization which facilitate to detect trends. Results of this study projects that precipitation trend was increasing more than 70% of weather stations for February, March, April, August, and September represented as base years. Precipitation trend was decreased in February to April but increase in July to October in projected years. Highest decreasing trend was reported in January for base years which was also decreased in projected years. Greater variation in precipitation trends for projected and base years was reported in February to April. Variations in projected precipitation trend for Punjab and Baluchistan highly accredited in March and April. Seasonal analysis shows large variation in winter, which shows increasing trend for more than 30% of weather stations and this increased trend approaches 40% for projected precipitation. High risk was reported in base year pre-monsoon season where 90% of weather station shows increasing trend but in projected years this trend decreased up to 33%. Finally, the annual precipitation trend has increased for more than 90% of meteorological stations in base (1996-2015) which has decreased for projected year (2041-2060) up to 76%. These result revealed that overall precipitation trend is decreasing in future year which may prolonged the drought in 14% of weather stations under study.
NASA Astrophysics Data System (ADS)
Fuchs, Sven; Thaler, Thomas; Bonnefond, Mathieu; Clarke, Darren; Driessen, Peter; Hegger, Dries; Gatien-Tournat, Amandine; Gralepois, Mathilde; Fournier, Marie; Mees, Heleen; Murphy, Conor; Servain-Courant, Sylvie
2015-04-01
Facing the challenges of climate change, this project aims to analyse and to evaluate the multiple use of flood alleviation schemes with respect to social transformation in communities exposed to flood hazards in Europe. The overall goals are: (1) the identification of indicators and parameters necessary for strategies to increase societal resilience, (2) an analysis of the institutional settings needed for societal transformation, and (3) perspectives of changing divisions of responsibilities between public and private actors necessary to arrive at more resilient societies. This proposal assesses societal transformations from the perspective of changing divisions of responsibilities between public and private actors necessary to arrive at more resilient societies. Yet each risk mitigation measure is built on a narrative of exchanges and relations between people and therefore may condition the outputs. As such, governance is done by people interacting and defining risk mitigation measures as well as climate change adaptation are therefore simultaneously both outcomes of, and productive to, public and private responsibilities. Building off current knowledge this project will focus on different dimensions of adaptation and mitigation strategies based on social, economic and institutional incentives and settings, centring on the linkages between these different dimensions and complementing existing flood risk governance arrangements. The policy dimension of adaptation, predominantly decisions on the societal admissible level of vulnerability and risk, will be evaluated by a human-environment interaction approach using multiple methods and the assessment of social capacities of stakeholders across scales. As such, the challenges of adaptation to flood risk will be tackled by converting scientific frameworks into practical assessment and policy advice. In addressing the relationship between these dimensions of adaptation on different temporal and spatial scales, this project is both scientifically innovative and policy relevant, thereby supporting climate policy needs in Europe towards a concept of risk governance. Key words: climate change adaptation; transformation; flood risk management; resilience; vulnerability; innovative bottom-up developments; multifunctional use
Managing Space Radiation Risks on Lunar and Mars Missions: Risk Assessment and Mitigation
NASA Technical Reports Server (NTRS)
Cucinotta, F. A.; George, K.; Hu, X.; Kim, M. H.; Nikjoo, H.
2006-01-01
Radiation-induced health risks are a primary concern for human exploration outside the Earth's magnetosphere, and require improved approaches to risk estimation and tools for mitigation including shielding and biological countermeasures. Solar proton events are the major concern for short-term lunar missions (<60 d), and for long-term missions (>60 d) such as Mars exploration, the exposures to the high energy and charge (HZE) ions that make-up the galactic cosmic rays are the major concern. Health risks from radiation exposure are chronic risks including carcinogenesis and degenerative tissue risks, central nervous system effects, and acute risk such as radiation sickness or early lethality. The current estimate is that a more than four-fold uncertainty exists in the projection of lifetime mortality risk from cosmic rays, which severely limits analysis of possible benefits of shielding or biological countermeasure designs. Uncertainties in risk projections are largely due to insufficient knowledge of HZE ion radiobiology, which has led NASA to develop a unique probabilistic approach to radiation protection. We review NASA's approach to radiation risk assessment including its impact on astronaut dose limits and application of the ALARA (As Low as Reasonably Achievable) principle. The recently opened NASA Space Radiation Laboratory (NSRL) provides the capability to simulate the cosmic rays in controlled ground-based experiments with biological and shielding models. We discuss how research at NSRL will lead to reductions in the uncertainties in risk projection models. In developing mission designs, the reduction of health risks and mission constraints including costs are competing concerns that need to be addressed through optimization procedures. Mitigating the risks from space radiation is a multi-factorial problem involving individual factors (age, gender, genetic makeup, and exposure history), operational factors (planetary destination, mission length, and period in the solar cycle), and shielding characteristics (materials, mass, and topology). We review optimization metrics for radiation protection including scenarios that integrate biophysics models of radiation risks, operational variables, and shielding design tools needed to assess exploration mission designs. We discuss the application of a crosscutting metric, based on probabilistic risk assessment, to lunar and Mars mission trade studies including the assessment of multi-factorial problems and the potential benefits of new radiation health research strategies or mitigation technologies.
Managing Space Radiation Risks On Lunar and Mars Missions: Risk Assessment and Mitigation
NASA Technical Reports Server (NTRS)
Cucinotta, F. A.; George, K.; Hu, X.; Kim, M. H.; Nikjoo, H.
2005-01-01
Radiation-induced health risks are a primary concern for human exploration outside the Earth's magnetosphere, and require improved approaches to risk estimation and tools for mitigation including shielding and biological countermeasures. Solar proton events are the major concern for short-term lunar missions (<60 d), and for long-term missions (>60 d) such as Mars exploration, the exposures to the high energy and charge (HZE) ions that make-up the galactic cosmic rays are the major concern. Health risks from radiation exposure are chronic risks including carcinogenesis and degenerative tissue risks, central nervous system effects, and acute risk such as radiation sickness or early lethality. The current estimate is that a more than four-fold uncertainty exists in the projection of lifetime mortality risk from cosmic rays, which severely limits analysis of possible benefits of shielding or biological countermeasure designs. Uncertainties in risk projections are largely due to insufficient knowledge of HZE ion radiobiology, which has led NASA to develop a unique probabilistic approach to radiation protection. We review NASA's approach to radiation risk assessment including its impact on astronaut dose limits and application of the ALARA (As Low as Reasonably Achievable) principle. The recently opened NASA Space Radiation Laboratory (NSRL) provides the capability to simulate the cosmic rays in controlled ground-based experiments with biological and shielding models. We discuss how research at NSRL will lead to reductions in the uncertainties in risk projection models. In developing mission designs, the reduction of health risks and mission constraints including costs are competing concerns that need to be addressed through optimization procedures. Mitigating the risks from space radiation is a multi-factorial problem involving individual factors (age, gender, genetic makeup, and exposure history), operational factors (planetary destination, mission length, and period in the solar cycle), and shielding characteristics (materials, mass, and topology). We review optimization metrics for radiation protection including scenarios that integrate biophysics models of radiation risks, operational variables, and shielding design tools needed to assess exploration mission designs. We discuss the application of a crosscutting metric, based on probabilistic risk assessment, to lunar and Mars mission trade studies including the assessment of multi-factorial problems and the potential benefits of new radiation health research strategies or mitigation technologies.
Managing Space Radiation Risks on Lunar and Mars Missions: Risk Assessment and Mitigation
NASA Technical Reports Server (NTRS)
Cucinotta, F. A.; George, K.; Hu, X.; Kim, M. H.; Nikjoo, H.; Ponomarev, A.; Ren, L.; Shavers, M. R.; Wu, H.
2005-01-01
Radiation-induced health risks are a primary concern for human exploration outside the Earth's magnetosphere, and require improved approaches to risk estimation and tools for mitigation including shielding and biological countermeasures. Solar proton events are the major concern for short-term lunar missions (<60 d), and for long-term missions (>60 d) such as Mars exploration, the exposures to the high energy and charge (HZE) ions that make-up the galactic cosmic rays are the major concern. Health risks from radiation exposure are chronic risks including carcinogenesis and degenerative tissue risks, central nervous system effects, and acute risk such as radiation sickness or early lethality. The current estimate is that a more than four-fold uncertainty exists in the projection of lifetime mortality risk from cosmic rays, which severely limits analysis of possible benefits of shielding or biological countermeasure designs. Uncertainties in risk projections are largely due to insufficient knowledge of HZE ion radiobiology, which has led NASA to develop a unique probabilistic approach to radiation protection. We review NASA's approach to radiation risk assessment including its impact on astronaut dose limits and application of the ALARA (As Low as Reasonably Achievable) principle. The recently opened NASA Space Radiation Laboratory (NSRL) provides the capability to simulate the cosmic rays in controlled ground-based experiments with biological and shielding models. We discuss how research at NSRL will lead to reductions in the uncertainties in risk projection models. In developing mission designs, the reduction of health risks and mission constraints including costs are competing concerns that need to be addressed through optimization procedures. Mitigating the risks from space radiation is a multi-factorial problem involving individual factors (age, gender, genetic makeup, and exposure history), operational factors (planetary destination, mission length, and period in the solar cycle), and shielding characteristics (materials, mass, and topology). We review optimization metrics for radiation protection including scenarios that integrate biophysics models of radiation risks, operational variables, and shielding design tools needed to assess exploration mission designs. We discuss the application of a crosscutting metric, based on probabilistic risk assessment, to lunar and Mars mission trade studies including the assessment of multi-factorial problems and the potential benefits of new radiation health research strategies or mitigation technologies.
Comparative Analysis of Treatment Costs in EUROHOPE.
Iversen, Tor; Aas, Eline; Rosenqvist, Gunnar; Häkkinen, Unto
2015-12-01
This study examines the challenges of estimating risk-adjusted treatment costs in international comparative research, specifically in the European Health Care Outcomes, Performance, and Efficiency (EuroHOPE) project. We describe the diverse format of resource data and challenges of converting these data into resource use indicators that allow meaningful cross-country comparisons. The three cost indicators developed in EuroHOPE are then described, discussed, and applied. We compare the risk-adjusted mean treatment costs of acute myocardial infarction for four of the seven countries in the EuroHOPE project, namely, Finland, Hungary, Norway, and Sweden. The outcome of the comparison depends on the time perspective as well as on the particular resource use indicator. We argue that these complementary indicators add to our understanding of the variation in resource use across countries. Copyright © 2015 John Wiley & Sons, Ltd.
Teresa E. Jordan
2015-09-30
This submission contains information used to compute the risk factors for the GPFA-AB project (DE-EE0006726). The risk factors are natural reservoir quality, thermal resource quality, potential for induced seismicity, and utilization. The methods used to combine the risk factors included taking the product, sum, and minimum of the four risk factors. The files are divided into images, rasters, shapefiles, and supporting information. The image files show what the raster and shapefiles should look like. The raster files contain the input risk factors, calculation of the scaled risk factors, and calculation of the combined risk factors. The shapefiles include definition of the fairways, definition of the US Census Places, the center of the raster cells, and locations of industries. Supporting information contains details of the calculations or processing used in generating the files. An image of the raster will have the same name except *.png as the file ending instead of *.tif. Images with “fairways” or “industries” added to the name are composed of a raster with the relevant shapefile added. The file About_GPFA-AB_Phase1RiskAnalysisTask5DataUpload.pdf contains information the citation, special use considerations, authorship, etc. More details on each file are given in the spreadsheet “list_of_contents.csv” in the folder “SupportingInfo”. Code used to calculate values is available at https://github.com/calvinwhealton/geothermal_pfa under the folder “combining_metrics”.
Wu, Jianyong; Zhou, Ying; Gao, Yang; Fu, Joshua S.; Johnson, Brent A.; Huang, Cheng; Kim, Young-Min
2013-01-01
Background: Climate change is anticipated to influence heat-related mortality in the future. However, estimates of excess mortality attributable to future heat waves are subject to large uncertainties and have not been projected under the latest greenhouse gas emission scenarios. Objectives: We estimated future heat wave mortality in the eastern United States (approximately 1,700 counties) under two Representative Concentration Pathways (RCPs) and investigated sources of uncertainty. Methods: Using dynamically downscaled hourly temperature projections for 2057–2059, we projected heat wave days that were defined using four heat wave metrics and estimated the excess mortality attributable to them. We apportioned the sources of uncertainty in excess mortality estimates using a variance-decomposition method. Results: Estimates suggest that excess mortality attributable to heat waves in the eastern United States would result in 200–7,807 deaths/year (mean 2,379 deaths/year) in 2057–2059. Average excess mortality projections under RCP4.5 and RCP8.5 scenarios were 1,403 and 3,556 deaths/year, respectively. Excess mortality would be relatively high in the southern states and eastern coastal areas (excluding Maine). The major sources of uncertainty were the relative risk estimates for mortality on heat wave versus non–heat wave days, the RCP scenarios, and the heat wave definitions. Conclusions: Mortality risks from future heat waves may be an order of magnitude higher than the mortality risks reported in 2002–2004, with thousands of heat wave–related deaths per year in the study area projected under the RCP8.5 scenario. Substantial spatial variability in county-level heat mortality estimates suggests that effective mitigation and adaptation measures should be developed based on spatially resolved data. Citation: Wu J, Zhou Y, Gao Y, Fu JS, Johnson BA, Huang C, Kim YM, Liu Y. 2014. Estimation and uncertainty analysis of impacts of future heat waves on mortality in the eastern United States. Environ Health Perspect 122:10–16; http://dx.doi.org/10.1289/ehp.1306670 PMID:24192064
Saura, Rosa Maria; Moreno, Pilar; Vallejo, Paula; Oliva, Glòria; Alava, Fernando; Esquerra, Miquel; Davins, Josep; Vallès, Roser; Bañeres, Joaquim
2014-07-01
Since its inception in 2006, the Alliance for Patient Safety in Catalonia has played a major role in promoting and shaping a series of projects related to the strategy of the Ministry of Health, Social Services and Equality, for improving patient safety. One such project was the creation of functional units or committees of safety in hospitals in order to facilitate the management of patient safety. The strategy has been implemented in hospitals in Catalonia which were selected based on criteria of representativeness. The intervention was based on two lines of action, one to develop the model framework and the other for its development. Firstly the strategy for safety management based on EFQM (European Foundation for Quality Management) was defined with the development of standards, targets and indicators to implement security while the second part involved the introduction of tools, methodologies and knowledge to the management support of patient safety and risk prevention. The project was developed in four hospital areas considered higher risk, each assuming six goals for safety management. Some of these targets such as the security control panel or system of adverse event reporting were shared. 23 hospitals joined the project in Catalonia. Despite the different situations in each centre, high compliance was achieved in the development of the objectives. In each of the participating areas the security control panel was developed. Stable structures for safety management were established or strengthened. Training in patient safety played and important role, 1415 professionals participated. Through these kind of projects not only have been introduced programs of proven effectiveness in reducing risks, but they also provide to the facilities a work system that allows autonomy in diagnosis and analysis of the different risk situations or centre specific safety issues. Copyright © 2014. Published by Elsevier Espana.
Understanding extreme sea levels for broad-scale coastal impact and adaptation analysis
NASA Astrophysics Data System (ADS)
Wahl, T.; Haigh, I. D.; Nicholls, R. J.; Arns, A.; Dangendorf, S.; Hinkel, J.; Slangen, A. B. A.
2017-07-01
One of the main consequences of mean sea level rise (SLR) on human settlements is an increase in flood risk due to an increase in the intensity and frequency of extreme sea levels (ESL). While substantial research efforts are directed towards quantifying projections and uncertainties of future global and regional SLR, corresponding uncertainties in contemporary ESL have not been assessed and projections are limited. Here we quantify, for the first time at global scale, the uncertainties in present-day ESL estimates, which have by default been ignored in broad-scale sea-level rise impact assessments to date. ESL uncertainties exceed those from global SLR projections and, assuming that we meet the Paris agreement goals, the projected SLR itself by the end of the century in many regions. Both uncertainties in SLR projections and ESL estimates need to be understood and combined to fully assess potential impacts and adaptation needs.
Impact of Research and Development, Analysis, and Standardization on PV Project Financing Costs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Feldman, David J; Margolis, Robert M; Jones-Albertus, Rebecca
The technical report discusses how R and D efforts focused on removing perceived risk from cash flows to investors have the potential to lower the cost of capital and increase the amount of leverage in a solar project. It also discusses how creating business efficiencies that allow financing transactions to occur more quickly with less effort can reduce the upfront costs associated with arranging financing for a solar project or group of projects. The paper then assesses the impact that these R and D activities might have on the volatility of PV asset cash flows and asset value, as wellmore » as the upfront costs of arranging a financial transaction. Finally, we insert these assumptions into financial models to analyze their impacts on the cost of capital for equity and debt investors, project leverage, and upfront financial transaction costs.« less
Informing the NCA: EPA's Climate Change Impact and Risk Analysis Framework
NASA Astrophysics Data System (ADS)
Sarofim, M. C.; Martinich, J.; Kolian, M.; Crimmins, A. R.
2017-12-01
The Climate Change Impact and Risk Analysis (CIRA) framework is designed to quantify the physical impacts and economic damages in the United States under future climate change scenarios. To date, the framework has been applied to 25 sectors, using scenarios and projections developed for the Fourth National Climate Assessment. The strength of this framework has been in the use of consistent climatic, socioeconomic, and technological assumptions and inputs across the impact sectors to maximize the ease of cross-sector comparison. The results of the underlying CIRA sectoral analyses are informing the sustained assessment process by helping to address key gaps related to economic valuation and risk. Advancing capacity and scientific literature in this area has created opportunity to consider future applications and strengthening of the framework. This presentation will describe the CIRA framework, present results for various sectors such as heat mortality, air & water quality, winter recreation, and sea level rise, and introduce potential enhancements that can improve the utility of the framework for decision analysis.
Exploration Laboratory Analysis FY13
NASA Technical Reports Server (NTRS)
Krihak, Michael; Perusek, Gail P.; Fung, Paul P.; Shaw, Tianna, L.
2013-01-01
The Exploration Laboratory Analysis (ELA) project supports the Exploration Medical Capability (ExMC) risk, which is stated as the Risk of Inability to Adequately Treat an Ill or Injured Crew Member, and ExMC Gap 4.05: Lack of minimally invasive in-flight laboratory capabilities with limited consumables required for diagnosing identified Exploration Medical Conditions. To mitigate this risk, the availability of inflight laboratory analysis instrumentation has been identified as an essential capability in future exploration missions. Mission architecture poses constraints on equipment and procedures that will be available to treat evidence-based medical conditions according to the Space Medicine Exploration Medical Conditions List (SMEMCL), and to perform human research studies on the International Space Station (ISS) that are supported by the Human Health and Countermeasures (HHC) element. Since there are significant similarities in the research and medical operational requirements, ELA hardware development has emerged as a joint effort between ExMC and HHC. In 2012, four significant accomplishments were achieved towards the development of exploration laboratory analysis for medical diagnostics. These achievements included (i) the development of high priority analytes for research and medical operations, (ii) the development of Level 1 functional requirements and concept of operations documentation, (iii) the selection and head-to-head competition of in-flight laboratory analysis instrumentation, and (iv) the phase one completion of the Small Business Innovation Research (SBIR) projects under the topic Smart Phone Driven Blood-Based Diagnostics. To utilize resources efficiently, the associated documentation and advanced technologies were integrated into a single ELA plan that encompasses ExMC and HHC development efforts. The requirements and high priority analytes was used in the selection of the four in-flight laboratory analysis performers. Based upon the competition results, a down select process will be performed in the upcoming year. Looking ahead, this unified effort has positioned each element for an in-flight lab analysis demonstration of select diagnostics measurements in the 2015 timeframe.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-23
... 1969, as amended, for a proposed flood-risk management project in the Puyallup River Basin including.... This is a single-purpose flood-risk management study. The goal of this project is to identify the.... Alternative 2: Construct a coordinated flood-risk management project that would provide critically needed...
Chen, Li-Ding; Lu, Yi-He; Tian, Hui-Ying; Shi, Qian
2007-03-01
Global ecological security becomes increasingly important with the intensive human activities. The function of ecological security is influenced by human activities, and in return, the efficiency of human activities will also be affected by the patterns of regional ecological security. Since the 1990s, China has initiated the construction of key projects "Yangtze Three Gorges Dam", "Qinghai-Tibet Railway", "West-to-East Gas Pipeline", "West-to-East Electricity Transmission" and "South-to-North Water Transfer" , etc. The interaction between these projects and regional ecological security has particularly attracted the attention of Chinese government. It is not only important for the regional environmental protection, but also of significance for the smoothly implementation of various projects aimed to develop an ecological rehabilitation system and to design a regional ecological security pattern. This paper made a systematic analysis on the types and characteristics of key project construction and their effects on the environment, and on the basis of this, brought forward the basic principles and methodology for ecological rehabilitation and security pattern design in this construction. It was considered that the following issues should be addressed in the implementation of a key project: 1) analysis and evaluation of current regional ecological environment, 2) evaluation of anthropogenic disturbances and their ecological risk, 3) regional ecological rehabilitation and security pattern design, 4) scenario analysis of environmental benefits of regional ecological security pattern, 5) re-optimization of regional ecological system framework, and 6) establishment of regional ecosystem management plan.
The Maricopa Integrated Risk Assessment Project: A New Way of Looking at Risk
ERIC Educational Resources Information Center
Unks, Ruth A.; Thor, Linda
2008-01-01
This article reviews the Maricopa Integrated Risk Assessment (MIRA) project and discusses its challenges and successes. Strategies and resources are offered for assisting community college administrators, faculty, and staff to successfully implement enterprise risk management at their institutions.
Risk to researchers in qualitative research on sensitive topics: issues and strategies.
Dickson-Swift, Virginia; James, Erica L; Kippen, Sandra; Liamputtong, Pranee
2008-01-01
Traditionally, risk assessments in research have been limited to examining the risks to the research participants. Although doing so is appropriate and important, there is growing recognition that undertaking research can pose risks to researchers as well. A grounded theory study involving a range of researchers who had undertaken qualitative health research on a sensitive topic was completed. Analysis of the in-depth, face-to-face unstructured individual interviews with 30 Australian public health researchers provided evidence that researchers do confront a number of physical and emotional risks when undertaking research. Training, preparation, and supervision must be taken into account so that the risk to researchers can be minimized. Researchers need to consider occupational health and safety issues in designing research projects that deal with physical and emotional risks. Recommendations for professional supervision, policy development, and minimum training standards for researchers are provided.