Sample records for properly designed installed

  1. Diatomite filtration of water for injection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olmsted, B.C. Jr.; Bell, G.R.

    1966-01-01

    A discussion is presented of the capabilities, problems, and answers, in the performance of diatomite filters. The discussion includes a description of diatomite filtration, new developments, design criteria, and some case histories. Diatomite filters, when properly designed and installed, and when properly applied, can provide effective clarification of waters for injection at low capital and operating costs. Design, installation, and proper application, effectiveness, and capital and operating costs can be placed in the proper perspective in the light of general experience and recent pilot plant tests in the southern California area. (30 refs.)

  2. 47 CFR 78.51 - Remote control operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... control system shall be installed and protected in a manner designed to prevent tampering or operation by... transmissions and a carrier operated device which will give a continuous visual indication whenever the... necessary to insure proper operation. (4) The control circuits shall be so designed and installed that short...

  3. 47 CFR 78.51 - Remote control operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... control system shall be installed and protected in a manner designed to prevent tampering or operation by... transmissions and a carrier operated device which will give a continuous visual indication whenever the... necessary to insure proper operation. (4) The control circuits shall be so designed and installed that short...

  4. 46 CFR 61.35-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... equipment must be tested and inspected to verify their proper design, construction, installation, and operation. (d) All tests must be performed after installation of the automatic auxiliary boiler and its... monitored system conditions by misadjustment, artificial signals, improper wiring, tampering, or revision of...

  5. Review of Aircraft Engine Fan Noise Reduction

    NASA Technical Reports Server (NTRS)

    VanZante, Dale

    2008-01-01

    Aircraft turbofan engines incorporate multiple technologies to enhance performance and durability while reducing noise emissions. Both careful aerodynamic design of the fan and proper installation of the fan into the system are requirements for achieving the performance and acoustic objectives. The design and installation characteristics of high performance aircraft engine fans will be discussed along with some lessons learned that may be applicable to spaceflight fan applications.

  6. Geoexchange: Getting it Right

    ERIC Educational Resources Information Center

    Johnson, William C.; Ormond, Paul

    2013-01-01

    If properly installed, optimized geoexchange systems can be one of the most cost effective, powerful options to accomplish the goal of improved energy efficiency and reduced carbon emissions. Accurately quantifying field performance is an important step in designing a system that is the proper size and capacity. The authors share the real life…

  7. 36 CFR 1234.10 - What are the facility requirements for all records storage facilities?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the HVAC systems, fire alarm and fire protection systems. Manual switching between sources of service... elements are protected by a properly installed, properly maintained wet-pipe automatic sprinkler system, as... must provide documentation that the facility has a fire suppression system specifically designed to...

  8. The Moisture Menace.

    ERIC Educational Resources Information Center

    Chivetta, Christopher

    2001-01-01

    Discusses how to control an indoor pool environment by understanding the mechanics of water evaporation, condensation, and migration. Stresses the need for a properly designed, installed, operated, and maintained mechanical system. (GR)

  9. 47 CFR 74.634 - Remote control operation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...

  10. 47 CFR 74.634 - Remote control operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...

  11. 47 CFR 74.634 - Remote control operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...

  12. 47 CFR 74.634 - Remote control operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...

  13. 47 CFR 74.634 - Remote control operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...

  14. 46 CFR 61.35-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Design Verification and Periodic Testing for Automatic Auxiliary Boilers § 61.35-1 General. (a) All automatic... equipment must be tested and inspected to verify their proper design, construction, installation, and...

  15. Committee Report: Metrics & Methods for MF/UF System Optimization

    EPA Science Inventory

    After a membrane filtration (i.e., microfiltration (MF) and ultrafiltration (UF)) system is designed, installed, and commissioned, it is essential that the plant is well-maintained in order to proactively identify potential design or equipment problems and ensure its proper opera...

  16. Safe and Sanitary.

    ERIC Educational Resources Information Center

    Turner, Ed; Hauser, Dan

    1994-01-01

    Explains how daily maintenance and design planning can reduce the potential safety hazards found in athletic-facility locker rooms. Topics include designing locker rooms for visual openness and traffic control, providing non-slip surfaces and proper drainage, installing ventilation systems that can handle the moisture produced in locker rooms,…

  17. Design-of-experiments to Reduce Life-cycle Costs in Combat Aircraft Inlets

    NASA Technical Reports Server (NTRS)

    Anderson, Bernhard H.; Baust, Henry D.; Agrell, Johan

    2003-01-01

    It is the purpose of this study to demonstrate the viability and economy of Design- of-Experiments (DOE), to arrive at micro-secondary flow control installation designs that achieve optimal inlet performance for different mission strategies. These statistical design concepts were used to investigate the properties of "low unit strength" micro-effector installation. "Low unit strength" micro-effectors are micro-vanes, set a very low angle-of incidence, with very long chord lengths. They are designed to influence the neat wall inlet flow over an extended streamwise distance. In this study, however, the long chord lengths were replicated by a series of short chord length effectors arranged in series over multiple bands of effectors. In order to properly evaluate the performance differences between the single band extended chord length installation designs and the segmented multiband short chord length designs, both sets of installations must be optimal. Critical to achieving optimal micro-secondary flow control installation designs is the understanding of the factor interactions that occur between the multiple bands of micro-scale vane effectors. These factor interactions are best understood and brought together in an optimal manner through a structured DOE process, or more specifically Response Surface Methods (RSM).

  18. Proper Installation of New Windows | Efficient Windows Collaborative

    Science.gov Websites

    airtight fit and avoid water leakage. Always follow manufacturers installation guidelines and use trained professionals for window installation. Proper installation will: Protect from water damage. Windows should form a continuous water barrier where they meet the wall. With improper installation, water may penetrate

  19. On-farm irrigatrion system design and operation

    USDA-ARS?s Scientific Manuscript database

    Most commercial blueberry fields are irrigated by overhead sprinklers or drip. Water is typically applied one to two times per week as needed with sprinklers, and every one to three days with drip. Sprinkler systems are relatively simple to install and maintain, and when designed properly, obtain re...

  20. 14 CFR 23.1351 - General.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .../alternator. (5) Each generator/alternator must have an overvoltage control designed and installed to prevent... control and protective devices, must be able to furnish the required power at the proper voltage to each... detrimental substances, and mechanical damage; and (iii) So designed that the risk of electrical shock to crew...

  1. 14 CFR 23.1351 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .../alternator. (5) Each generator/alternator must have an overvoltage control designed and installed to prevent... control and protective devices, must be able to furnish the required power at the proper voltage to each... detrimental substances, and mechanical damage; and (iii) So designed that the risk of electrical shock to crew...

  2. 14 CFR 23.1351 - General.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .../alternator. (5) Each generator/alternator must have an overvoltage control designed and installed to prevent... control and protective devices, must be able to furnish the required power at the proper voltage to each... detrimental substances, and mechanical damage; and (iii) So designed that the risk of electrical shock to crew...

  3. 14 CFR 23.1351 - General.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .../alternator. (5) Each generator/alternator must have an overvoltage control designed and installed to prevent... control and protective devices, must be able to furnish the required power at the proper voltage to each... detrimental substances, and mechanical damage; and (iii) So designed that the risk of electrical shock to crew...

  4. 14 CFR 23.1351 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .../alternator. (5) Each generator/alternator must have an overvoltage control designed and installed to prevent... control and protective devices, must be able to furnish the required power at the proper voltage to each... detrimental substances, and mechanical damage; and (iii) So designed that the risk of electrical shock to crew...

  5. 75 FR 35619 - Airworthiness Directives; Piper Aircraft, Inc. Models PA-32R-301T and PA-46-350P Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-23

    ... tighten to an July 28, 2010 (the initial torque of effective date of 40 in. lbs. Tap the this AD... installation than by a change in clamp design. Their experience shows proper installation, torque techniques, and pre-torque alignments of components go a long way in preventing clamp failures down the road. We...

  6. 47 CFR 78.51 - Remote control operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... necessary to insure proper operation. (4) The control circuits shall be so designed and installed that short circuits, open circuits, other line faults, or any other cause which would result in loss of control of the...

  7. Improve Carpet Life with Proper Installation.

    ERIC Educational Resources Information Center

    Grogan, Ralph

    1998-01-01

    Provides guidance on ways to extend carpet life in educational facilities by paying attention to the details of carpeting installation. Issues to consider include choosing carpeting to meet specific usage requirements, are fiber protectorants used, is the installation properly done by qualified installers, and is moisture testing done prior to…

  8. 49 CFR 236.1015 - PTC Safety Plan content requirements and PTC System Certification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... established and can maintain a quality control system for PTC system design and manufacturing acceptable to... an explanation of the design principles and assumptions; (3) A risk assessment of the as-built PTC... the specific procedures and test equipment necessary to ensure the safe and proper installation...

  9. Translations on Environmental Quality, Number 148

    DTIC Science & Technology

    1977-10-03

    Article 9. Designs for gas filtering installations must include the proper control and automation facilities as per articles 16 and 17. Article 10...mandatorily equipped with: 1. Locking armature at the gas entrance and exit with manual or remote control flanges for the installation of end-caps in...instruments shall be mounted on the control panel of the gas filtering system or the control panel for the technological process. Article 17. (1) The gas

  10. A design strategy for the use of vortex generators to manage inlet-engine distortion using computational fluid dynamics

    NASA Technical Reports Server (NTRS)

    Anderson, Bernhard H.; Levy, Ralph

    1991-01-01

    A reduced Navier-Stokes solution technique was successfully used to design vortex generator installations for the purpose of minimizing engine face distortion by restructuring the development of secondary flow that is induced in typical 3-D curved inlet ducts. The results indicate that there exists an optimum axial location for this installation of corotating vortex generators, and within this configuration, there exists a maximum spacing between generator blades above which the engine face distortion increases rapidly. Installed vortex generator performance, as measured by engine face circumferential distortion descriptors, is sensitive to Reynolds number and thereby the generator scale, i.e., the ratio of generator blade height to local boundary layer thickness. Installations of corotating vortex generators work well in terms of minimizing engine face distortion within a limited range of generator scales. Hence, the design of vortex generator installations is a point design, and all other conditions are off design. In general, the loss levels associated with a properly designed vortex generator installation are very small; thus, they represent a very good method to manage engine face distortion. This study also showed that the vortex strength, generator scale, and secondary flow field structure have a complicated and interrelated influence over engine face distortion, over and above the influence of the initial arrangement of generators.

  11. Antipilferage Seal User’s Guide

    DTIC Science & Technology

    1997-10-01

    seal is properly installed, ensure that there is no free play between the seal body and the wire. Verify and record the serial number. During post...and Record - Once the seal is properly installed, ensure that there is no free play between the seal body and the wire. During post-mortem...seal is properly installed, ensure that there is no free play between the seal body and the wire. Verify and record the serial number. During post

  12. 21 CFR 225.30 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... CURRENT GOOD MANUFACTURING PRACTICE FOR MEDICATED FEEDS Construction and Maintenance of Facilities and Equipment § 225.30 Equipment. (a) Equipment which is designed to perform its intended function and is properly installed and used is essential to the manufacture of medicated feeds. Such equipment permits...

  13. Tests of oil scraper piston ring and piston fitted with oil drain holes

    NASA Technical Reports Server (NTRS)

    Mcdewell, H S

    1922-01-01

    Tests were conducted to determine whether or not a properly located and properly designed oil scraper piston ring, installed on a piston provided with oil drain holes of sufficient area, would prevent the excessive oiling of the Liberty engine, particularly with the engine running at idling speed with full oil pressure. Results showed that excessive oiling was in fact prevented. It is strongly recommended that scraper rings and pistons be adopted for aircraft engines.

  14. Proper Installation Improves Carpet Life.

    ERIC Educational Resources Information Center

    Grogan, Ralph

    1998-01-01

    Explains how proper carpet installation can add to carpet life; includes tips to consider before signing a carpet-installation purchasing agreement that can make the new carpet a better investment. Topics cover how color selection lengthens appearance life, the need for moisture testing, the importance of carpet seams in the purchasing process,…

  15. 47 CFR 74.434 - Remote control operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Remote control operation. 74.434 Section 74.434 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... functions to permit proper operation of the station. (b) A remote control system must be designed, installed...

  16. 47 CFR 74.434 - Remote control operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Remote control operation. 74.434 Section 74.434 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... functions to permit proper operation of the station. (b) A remote control system must be designed, installed...

  17. 47 CFR 74.434 - Remote control operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Remote control operation. 74.434 Section 74.434 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... functions to permit proper operation of the station. (b) A remote control system must be designed, installed...

  18. 47 CFR 74.434 - Remote control operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Remote control operation. 74.434 Section 74.434 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... functions to permit proper operation of the station. (b) A remote control system must be designed, installed...

  19. 47 CFR 74.434 - Remote control operation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false Remote control operation. 74.434 Section 74.434 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... functions to permit proper operation of the station. (b) A remote control system must be designed, installed...

  20. Titanium fasteners. [for aircraft industry

    NASA Technical Reports Server (NTRS)

    Phillips, J. L.

    1972-01-01

    Titanium fasteners are used in large quantities throughout the aircraft industry. Most of this usage is in aluminum structure; where titanium structure exists, titanium fasteners are logically used as well. Titanium fasteners offer potential weight savings to the designer at a cost of approximately $30 per pound of weight saved. Proper and least cost usage must take into consideration type of fastener per application, galvanic couples and installation characteristics of protective coatings, cosmetic appearance, paint adhesion, installation forces and methods available and fatigue performance required.

  1. Pendulum impact testing of an impact-breakaway, windresistant base connection for multi-post ground signs.

    DOT National Transportation Integrated Search

    2012-07-01

    Roadside signs play an important role in traffic control systems and must be placed adjacent to roadways. If they are not designed, : fabricated, and installed properly, ground signs may pose potential hazards to vehicle passengers in the event of a ...

  2. 40 CFR 57.503 - Control measures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., installation and proper operation of primary hoods on all active matte tap holes, matte launders, slag skim..., installation and proper operation of primary hoods on all active slag and lead bullion furnace tap holes and...

  3. Propfan experimental data analysis

    NASA Technical Reports Server (NTRS)

    Vernon, David F.; Page, Gregory S.; Welge, H. Robert

    1984-01-01

    A data reduction method, which is consistent with the performance prediction methods used for analysis of new aircraft designs, is defined and compared to the method currently used by NASA using data obtained from an Ames Res. Center 11 foot transonic wind tunnel test. Pressure and flow visualization data from the Ames test for both the powered straight underwing nacelle, and an unpowered contoured overwing nacelle installation is used to determine the flow phenomena present for a wind mounted turboprop installation. The test data is compared to analytic methods, showing the analytic methods to be suitable for design and analysis of new configurations. The data analysis indicated that designs with zero interference drag levels are achieveable with proper wind and nacelle tailoring. A new overwing contoured nacelle design and a modification to the wing leading edge extension for the current wind tunnel model design are evaluated. Hardware constraints of the current model parts prevent obtaining any significant performance improvement due to a modified nacelle contouring. A new aspect ratio wing design for an up outboard rotation turboprop installation is defined, and an advanced contoured nacelle is provided.

  4. Cyber-Defense Return on Investment for NAVFAC Energy Technologies

    DTIC Science & Technology

    2017-12-01

    Stakeholder input is important to properly develop a tool that reflects the legitimate concerns of those who routinely design , operate, and use control ...cybersecurity results with no control system network connectivity at all. Both are extreme scenarios, unless electrical engineers can design a...support of a Department of Defense (DOD) effort to improve cyber- security in relation to DOD installation control systems. Space and Naval Warfare

  5. Manual of design and installation of Forest Service water spray dry kiln

    Treesearch

    L.V. Teesdale

    1920-01-01

    The best thing that can be said of any dry kiln is that when it is run by a properly informed operator the temperature, humidity, and circulation are constant and uniform. In an endeavor to produce a kiln in which each of these could be regulated independently of the others, the Forest Products Laboratory designed and developed the "Forest Service Humidity...

  6. Media Equipped Classrooms: Giving Attention to the Teaching Station.

    ERIC Educational Resources Information Center

    Anderson, James A.; Cichocki, Ronald R.

    This paper provides an overview of the Media Equipped Classroom (MEC), i.e., a centrally scheduled or departmentally scheduled teaching space with permanently installed media and classroom support technology designed to enhance the quality of teaching when properly utilized. Specific emphasis is given to the teaching station at the State…

  7. 50 CFR 216.274 - Mitigation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... properly installed and in good working order to assist in the detection of marine mammals in the vicinity...” (20x110) binoculars shall be present and in good working order to assist in the detection of marine... NMFS Office of Protected Resources Headquarters Senior Official designated in the SOCAL Range Complex...

  8. 40 CFR 85.520 - Exemption provisions for outside useful life vehicles/engines.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Exemption of... following provisions: (1) You must notify us as described in this section. (2) Conversion test groups... properly designed and matched for the vehicles/engines in which they will be installed. Good engineering...

  9. 40 CFR 85.520 - Exemption provisions for outside useful life vehicles/engines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Exemption of... following provisions: (1) You must notify us as described in this section. (2) Conversion test groups... properly designed and matched for the vehicles/engines in which they will be installed. Good engineering...

  10. Impact of Fire Ventilation on General Ventilation in the Building

    NASA Astrophysics Data System (ADS)

    Zender-Świercz, Ewa; Telejko, Marek

    2017-10-01

    The fire of building is a threat to its users. The biggest threat is generation, during lifetime of fire, hot gases and smoke. The purpose of quick and efficient evacuation from the area covered by the fire, at first step the escape routes have to be secured from smokiness. The smoke ventilation systems are used for this purpose. The proper design and execution of smoke ventilation is important not only because of the safety, but also of the maintenance of comfort in the building at a time when there is no fire. The manuscript presents the effect of incorrectly realized smoke ventilation in the stairwell of the medium building. The analysis shows that the flaps of smoke ventilation located in the stairwell may have a significant impact on the proper functioning of mechanical ventilation in the period when there is no fire. The improperly installed or incorrect insulated components cause perturbation of air flow and they change pressure distribution in the building. The conclusion of the analysis is the need to include the entire technical equipment of the building during the design and realization of its individual elements. The impact of various installations at each other is very important, and the omission of any of them can cause disturbances in the proper work of another.

  11. 14 CFR 25.562 - Emergency landing dynamic conditions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...— (1) Proper use is made of seats, safety belts, and shoulder harnesses provided for in the design; and... likelihood of the upper torso restraint system (where installed) moving off the occupant's shoulder, and with... shoulder during the impact. (4) The lap safety belt must remain on the occupant's pelvis during the impact...

  12. 14 CFR 25.562 - Emergency landing dynamic conditions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...— (1) Proper use is made of seats, safety belts, and shoulder harnesses provided for in the design; and... likelihood of the upper torso restraint system (where installed) moving off the occupant's shoulder, and with... shoulder during the impact. (4) The lap safety belt must remain on the occupant's pelvis during the impact...

  13. 14 CFR 25.562 - Emergency landing dynamic conditions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...— (1) Proper use is made of seats, safety belts, and shoulder harnesses provided for in the design; and... likelihood of the upper torso restraint system (where installed) moving off the occupant's shoulder, and with... shoulder during the impact. (4) The lap safety belt must remain on the occupant's pelvis during the impact...

  14. 14 CFR 25.562 - Emergency landing dynamic conditions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...— (1) Proper use is made of seats, safety belts, and shoulder harnesses provided for in the design; and... likelihood of the upper torso restraint system (where installed) moving off the occupant's shoulder, and with... shoulder during the impact. (4) The lap safety belt must remain on the occupant's pelvis during the impact...

  15. Operation and Maintenance of Wastewater Collection Systems. Volume I. Third Edition. A Field Study Training Program.

    ERIC Educational Resources Information Center

    California State Univ., Sacramento. Dept. of Civil Engineering.

    Proper installations, inspections, operations, maintenance and repairs of wastewater collection, conveyance and treatment facilities have a significant impact on the operation and maintenance costs, and the effectiveness of these facilities. This manual is the first volume of a two-part program designed to provide wastewater collection system…

  16. Application-Program-Installer Builder

    NASA Technical Reports Server (NTRS)

    Wolgast, Paul; Demore, Martha; Lowik, Paul

    2007-01-01

    A computer program builds application programming interfaces (APIs) and related software components for installing and uninstalling application programs in any of a variety of computers and operating systems that support the Java programming language in its binary form. This program is partly similar in function to commercial (e.g., Install-Shield) software. This program is intended to enable satisfaction of a quasi-industry-standard set of requirements for a set of APIs that would enable such installation and uninstallation and that would avoid the pitfalls that are commonly encountered during installation of software. The requirements include the following: 1) Properly detecting prerequisites to an application program before performing the installation; 2) Properly registering component requirements; 3) Correctly measuring the required hard-disk space, including accounting for prerequisite components that have already been installed; and 4) Correctly uninstalling an application program. Correct uninstallation includes (1) detecting whether any component of the program to be removed is required by another program, (2) not removing that component, and (3) deleting references to requirements of the to-be-removed program for components of other programs so that those components can be properly removed at a later time.

  17. Profiling USGA putting greens using GPR - an as-built surveying method

    USDA-ARS?s Scientific Manuscript database

    Golf course greens that are constructed to U.S. Golf Association (USGA) standards must adhere to strict installation specifications in order to maintain proper subsurface drainage. Because the infrastructure is buried, it can be difficult to ascertain if these drainage pipes were properly installed...

  18. Design and fabrication of a flexible tunnel for Sortie Laboratory

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A program was conducted to update a prototype design and to fabricate a flexible tunnel for a space shuttle/spacelab interface structure. The significant changes in the prototype are as follows: (1) elimination of foam from bladder laminate to increase bladder flexibility, (2) heat treat pulley brackets, bolts, and hinge pin to 160,000 psi minimum tensile strength, and (3) reduction of the meteoroid barrier from 0.5 inch to 0.375 inch. The thermal blanket installation study resulted in developing a method of installation by properly folding the various layers so that a uniform thickness could be maintained under the clamps. A single-lobe mockup was fabricated and cycled open and closed several times with no apparent damage to the blanket.

  19. 30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... properly or if any fluid flow is observed during the leakage test, the valve shall be repaired or replaced... maintenance of all fire- and gas-detection systems shall include the following: (i) Type, location, and number of detection sensors; (ii) Type and kind of alarms, including emergency equipment to be activated...

  20. Real-time POD-CFD Wind-Load Calculator for PV Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huayamave, Victor; Divo, Eduardo; Ceballos, Andres

    The primary objective of this project is to create an accurate web-based real-time wind-load calculator. This is of paramount importance for (1) the rapid and accurate assessments of the uplift and downforce loads on a PV mounting system, (2) identifying viable solutions from available mounting systems, and therefore helping reduce the cost of mounting hardware and installation. Wind loading calculations for structures are currently performed according to the American Society of Civil Engineers/ Structural Engineering Institute Standard ASCE/SEI 7; the values in this standard were calculated from simplified models that do not necessarily take into account relevant characteristics such asmore » those from full 3D effects, end effects, turbulence generation and dissipation, as well as minor effects derived from shear forces on installation brackets and other accessories. This standard does not include provisions that address the special requirements of rooftop PV systems, and attempts to apply this standard may lead to significant design errors as wind loads are incorrectly estimated. Therefore, an accurate calculator would be of paramount importance for the preliminary assessments of the uplift and downforce loads on a PV mounting system, identifying viable solutions from available mounting systems, and therefore helping reduce the cost of the mounting system and installation. The challenge is that although a full-fledged three-dimensional computational fluid dynamics (CFD) analysis would properly and accurately capture the complete physical effects of air flow over PV systems, it would be impractical for this tool, which is intended to be a real-time web-based calculator. CFD routinely requires enormous computation times to arrive at solutions that can be deemed accurate and grid-independent even in powerful and massively parallel computer platforms. This work is expected not only to accelerate solar deployment nationwide, but also help reach the SunShot Initiative goals of reducing the total installed cost of solar energy systems by 75%. The largest percentage of the total installed cost of solar energy system is associated with balance of system cost, with up to 40% going to “soft” costs; which include customer acquisition, financing, contracting, permitting, interconnection, inspection, installation, performance, operations, and maintenance. The calculator that is being developed will provide wind loads in real-time for any solar system designs and suggest the proper installation configuration and hardware; and therefore, it is anticipated to reduce system design, installation and permitting costs.« less

  1. A Robust Design Methodology for Optimal Microscale Secondary Flow Control in Compact Inlet Diffusers

    NASA Technical Reports Server (NTRS)

    Anderson, Bernhard H.; Keller, Dennis J.

    2001-01-01

    It is the purpose of this study to develop an economical Robust design methodology for microscale secondary flow control in compact inlet diffusers. To illustrate the potential of economical Robust Design methodology, two different mission strategies were considered for the subject inlet, namely Maximum Performance and Maximum HCF Life Expectancy. The Maximum Performance mission maximized total pressure recovery while the Maximum HCF Life Expectancy mission minimized the mean of the first five Fourier harmonic amplitudes, i.e., 'collectively' reduced all the harmonic 1/2 amplitudes of engine face distortion. Each of the mission strategies was subject to a low engine face distortion constraint, i.e., DC60<0.10, which is a level acceptable for commercial engines. For each of these missions strategies, an 'Optimal Robust' (open loop control) and an 'Optimal Adaptive' (closed loop control) installation was designed over a twenty degree angle-of-incidence range. The Optimal Robust installation used economical Robust Design methodology to arrive at a single design which operated over the entire angle-of-incident range (open loop control). The Optimal Adaptive installation optimized all the design parameters at each angle-of-incidence. Thus, the Optimal Adaptive installation would require a closed loop control system to sense a proper signal for each effector and modify that effector device, whether mechanical or fluidic, for optimal inlet performance. In general, the performance differences between the Optimal Adaptive and Optimal Robust installation designs were found to be marginal. This suggests, however, that Optimal Robust open loop installation designs can be very competitive with Optimal Adaptive close loop designs. Secondary flow control in inlets is inherently robust, provided it is optimally designed. Therefore, the new methodology presented in this paper, combined array 'Lower Order' approach to Robust DOE, offers the aerodynamicist a very viable and economical way of exploring the concept of Robust inlet design, where the mission variables are brought directly into the inlet design process and insensitivity or robustness to the mission variables becomes a design objective.

  2. Project SAGE: solar assisted gas energy. Final report and executive summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Phase III basic objective was establishment of a technical and economic baseline for proper assessment of the practical potential of solar water heating for apartments. Plans can then be formulated to improve SAGE technical design and performance; reduce SAGE costs; refine SAGE market assessment; and identify policies to encourage the use of SAGE. Two SAGE water heating systems were installed and tested. One system was retrofit onto an existing apartment building; the other was installed in a new apartment building. Each installation required approximately 1000 square feet of collector area tilted to an angle of 37/sup 0/ from themore » horizontal, and each was designed to supply about 70 percent of the energy for heating water for approximately 32 to 40 units of a typical two-story apartment complex in Southern California. Actual contruction costs were carefully compiled, and both installations were equipped with performance monitoring equipment. In addition, the operating and maintenance requirements of each installation was evaluated by gas company maintenance engineers. Upon completion of the installation analysis, the SAGE installation cost was further refined by obtaining firm SAGE construction bids from two plumbing contractors in Southern California. Market penetration was assessed by developing a computer simulation program using the technical and economic analysis from the installation experience. Also, the project examined the public policies required to encourage SAGE and other solar energy options. Results are presented and discussed. (WHK)« less

  3. Multiple speed expandable bit synchronizer

    NASA Technical Reports Server (NTRS)

    Bundinger, J. M.

    1979-01-01

    A multiple speed bit synchronizer was designed for installation in an inertial navigation system data decoder to extract non-return-to-zero level data and clock signal from biphase level data. The circuit automatically senses one of four pre-determined biphase data rates and synchronizes the proper clock rate to the data. Through a simple expansion of the basic design, synchronization of more than four binarily related data rates can be accomplished. The design provides an easily adaptable, low cost, low power alternative to external bit synchronizers with additional savings in size and weight.

  4. Design data brochure for CSI series V solar heating system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Generalized information on system configuration, system sizing, and mechanical layout is presented to assist the architect or designer in preparing construction drawings and specifications for the installation of the CSI integrated solar heating systems. Efficiency in space utilization of a full length collector and the importance of proper sizing of the collector array are among the topics discussed. Details of storage and transport subsystems are provided along with drawings and specifications of all components of the CSI system.

  5. Proper Installation of Replacement Windows | Efficient Windows

    Science.gov Websites

    . Quality installation is critical for an airtight fit and a continuous water barrier to prevent drafts , water damage and condensation. The complexity of the installation depends on whether you are considering and specifications. Install level, plumb, and square. Install water tight: water must be prevented

  6. Advanced Lighting Controls for Reducing Energy Use and Cost in DoD Installations

    DTIC Science & Technology

    2013-03-01

    of advanced lighting control strategies including occupancy sensing, light tuning, daylight harvesting and proper lighting design is an effective way...details of this project and the results obtained. 15. SUBJECT TERMS Integrated lighting controls, occupancy sensing, daylight harvesting , personalized...provide energy savings through occupancy sensing, dimming and daylight harvesting . II. Dynalite is a distributed control-based, wired networked building

  7. Improved refractory performance through partnership

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Linck, F.E.; Peters, D.

    1995-12-31

    From the early designs and construction of Circulating Fluidized Bed (CFB) boilers, many improvements have been made based upon observations of performance. Included in these improvements have been the refractory linings. The early refractory linings were subjected to extreme fluctuations in temperatures as the units experienced up and down conditions. As the designs were improved refractory failures were mostly due to the operating conditions and other mechanical stresses rather than continual shutdowns and startups. More recent problems observed with refractory linings are localized areas of high erosion, corrosion and cracking which result in hot spots and eventual shutdowns for repair.more » Today the objective of refractory suppliers and installers is to strive towards planned shutdowns rather than emergency shutdowns. This can be accomplished through partnerships between operations, material suppliers and installers. In essence, the concept is a cooperative effort between these groups to solve the variety of refractory problems in order to achieve longer refractory lining performance and less chance for emergency shutdowns. The reliability of the refractory lining is dependent on the successful combination of the material selected, proper design and the installation of the refractory material. Where these three elements combine, the lining has the best chance of performing its intended purpose.« less

  8. Bias in groundwater samples caused by wellbore flow

    USGS Publications Warehouse

    Reilly, Thomas E.; Franke, O. Lehn; Bennett, Gordon D.

    1989-01-01

    Proper design of physical installations and sampling procedures for groundwater monitoring networks is critical for the detection and analysis of possible contaminants. Monitoring networks associated with known contaminant sources sometimes include an array of monitoring wells with long well screens. The purpose of this paper is: (a) to report the results of a numerical experiment indicating that significant borehole flow can occur within long well screens installed in homogeneous aquifers with very small head differences in the aquifer (less than 0.01 feet between the top and bottom of the screen); (b) to demonstrate that contaminant monitoring wells with long screens may completely fail to fulfill their purpose in many groundwater environments.

  9. The Analysis of Soil Resistance During Screw Displacement Pile Installation

    NASA Astrophysics Data System (ADS)

    Krasinski, Adam

    2015-02-01

    The application of screw displacement piles (SDP) is still increasing due to their high efficiency and many advantages. However, one technological problem is a serious disadvantage of those piles. It relates to the generation of very high soil resistance during screw auger penetration, especially when piles are installed in non-cohesive soils. In many situations this problem causes difficulties in creating piles of designed length and diameter. It is necessary to find a proper method for prediction of soil resistance during screw pile installation. The analysis of screw resistances based on model and field tests is presented in the paper. The investigations were carried out as part of research project, financed by the Polish Ministry of Science and Higher Education. As a result of tests and analyses the empirical method for prediction of rotation resistance (torque) during screw auger penetration in non-cohesive subsoil based on CPT is proposed.

  10. Hybrid associative memory using an incoherent correlation system

    NASA Astrophysics Data System (ADS)

    Taniguchi, Masaki; Ichioka, Yoshiki; Matsuoka, Katsunori

    1990-10-01

    A hybrid heteroassociative memory is presented that uses an incoherent system in which two correlators and a nonlinear element form a nonlinear feedback system. This system can recall any pattern from an input pattern without cross-talk or ghosts by properly designing a pair of filters installed in the correlators. Experiments on a simple hybrid system were performed to ensure the operation of the system and to demonstrate the usefulness of this proposed system.

  11. Selection of a surface tension propellant management system for the Viking 75 Orbiter.

    NASA Technical Reports Server (NTRS)

    Dowdy, M. W.; Debrock, S. C.

    1972-01-01

    Discussion of the propellant management system requirements derived for the Viking 75 mission, and review of a series of surface tension propellant management system design concepts. The chosen concept is identified and its mission operation described. The ullage bubble and bulk liquid positioning characteristics are presented, along with propellant dynamic considerations entailed by thrust initiation/termination. Pressurization design considerations, required to assure minimum disturbance to the bulk propellant, are introduced as well as those of the tank ullage vent. Design provisions to assure liquid communication between tank ends are discussed. Results of a preliminary design study are presented, including mechanical testing requirements to assure structural integrity, propellant compatibility, and proper installation.

  12. Easy method of matching fighter engine to airframe for use in aircraft engine design courses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mattingly, J.D.

    1989-01-01

    The proper match of the engine(s) to the airframe affects both aircraft size and life cycle cost. A fast and straightforward method is developed and used for the matching of fighter engine(s) to airframes during conceptual design. A thrust-lapse equation is developed for the dual-spool, mixed-flow, afterburning turbofan type of engine based on the installation losses of 'Aircraft Engine Design' and the performance predictions of the cycle analysis programs ONX and OFFX. Using system performance requirements, the effects of aircraft thrust-to-weight, wing loading, and engine cycle on takeoff weight are analyzed and example design course results presented. 5 refs.

  13. Initial Results from Awesome VLF Receiver Installed in Ecuador

    NASA Astrophysics Data System (ADS)

    Lopez, Ericson

    2012-07-01

    In this work we present the first results that we have derived from analysis of data obtained using the Atmospheric Weather Electromagnetic System for Observation Modeling and Education (Awesome) VLF receiver, designed and developed by Stanford University, USA. The receiver was installed under inter-institutional cooperation in the emerging Space Science division of the Quito Astronomical Observatory, and it is working properly since 2010. We have describe the performance characteristic of the Awesome system and the importance of having receivers at equator for monitoring the ionosphere and magnetosphere, recepting extremely low frequencies (ELF;30-3000 Hz) and very low frequencies (VLF; 3-30 KHz) electromagnetic waves, in order to better understanding the physical processes which take place in these media.

  14. 32 CFR 842.28 - Who are proper claimants.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... paid from appropriated funds. (c) DOD school teachers and school administrative personnel who are provided logistic and administrative support by an Air Force installation commander. (d) Air Force Reserve... ADMINISTRATIVE CLAIMS Personnel Claims (31 U.S.C. 3701, 3721) § 842.28 Who are proper claimants. Proper claimants...

  15. Engineers in the mist: The solar in the jungle project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thornton, J.P.; Thornton, S.

    This article describes the design and installation of a photovoltaic power supply for a remote orangutan research station in the rain forest in Borneo. The unique needs of the station, including the problems created by noisy equipment and the transport of fuel offering potential for severe damage, are discussed, along with the design of the system, a community based system for the camp that would not only compensate for shadowing loss due to a chain link cage and meet the daily load, but would provide up to 20 days of energy if loads were managed properly.

  16. Plastic Tubing and Maple Syrup Quality

    Treesearch

    Russell S. Walters; Harry W. Yawney

    1978-01-01

    Maple syrup made from sap collected using improperly or carelessly installed plastic pipelines varied more in color from day to day, and was more often darker in color, than sap collected from either the property installed pipeline or clean, frequently emptied galvanized buckets. Use of both properly installed tubing and buckets, following recommended procedures,...

  17. Packaging - Materials review

    NASA Astrophysics Data System (ADS)

    Herrmann, Matthias

    2014-06-01

    Nowadays, a large number of different electrochemical energy storage systems are known. In the last two decades the development was strongly driven by a continuously growing market of portable electronic devices (e.g. cellular phones, lap top computers, camcorders, cameras, tools). Current intensive efforts are under way to develop systems for automotive industry within the framework of electrically propelled mobility (e.g. hybrid electric vehicles, plug-in hybrid electric vehicles, full electric vehicles) and also for the energy storage market (e.g. electrical grid stability, renewable energies). Besides the different systems (cell chemistries), electrochemical cells and batteries were developed and are offered in many shapes, sizes and designs, in order to meet performance and design requirements of the widespread applications. Proper packaging is thereby one important technological step for designing optimum, reliable and safe batteries for operation. In this contribution, current packaging approaches of cells and batteries together with the corresponding materials are discussed. The focus is laid on rechargeable systems for industrial applications (i.e. alkaline systems, lithium-ion, lead-acid). In principle, four different cell types (shapes) can be identified - button, cylindrical, prismatic and pouch. Cell size can be either in accordance with international (e.g. International Electrotechnical Commission, IEC) or other standards or can meet application-specific dimensions. Since cell housing or container, terminals and, if necessary, safety installations as inactive (non-reactive) materials reduce energy density of the battery, the development of low-weight packages is a challenging task. In addition to that, other requirements have to be fulfilled: mechanical stability and durability, sealing (e.g. high permeation barrier against humidity for lithium-ion technology), high packing efficiency, possible installation of safety devices (current interrupt device, valve, etc.), chemical inertness, cost issues, and others. Finally, proper cell design has to be considered for effective thermal management (i.e. cooling and heating) of battery packs.

  18. Teaching infant car seat installation via interactive visual presence: An experimental trial.

    PubMed

    Schwebel, David C; Johnston, Anna; Rouse, Jenni

    2017-02-17

    A large portion of child restraint systems (car seats) are installed incorrectly, especially when first-time parents install infant car seats. Expert instruction greatly improves the accuracy of car seat installation but is labor intensive and difficult to obtain for many parents. This study was designed to evaluate the efficacy of 3 ways of communicating instructions for proper car seat installation: phone conversation; HelpLightning, a mobile application (app) that offers virtual interactive presence permitting both verbal and interactive (telestration) visual communication; and the manufacturer's user manual. A sample of 39 young adults of child-bearing age who had no previous experience installing car seats were recruited and randomly assigned to install an infant car seat using guidance from one of those 3 communication sources. Both the phone and interactive app were more effective means to facilitate accurate car seat installation compared to the user manual. There was a trend for the app to offer superior communication compared to the phone, but that difference was not significant in most assessments. The phone and app groups also installed the car seat more efficiently and perceived the communication to be more effective and their installation to be more accurate than those in the user manual group. Interactive communication may help parents install car seats more accurately than using the manufacturer's manual alone. This was an initial study with a modestly sized sample; if results are replicated in future research, there may be reason to consider centralized "call centers" that provide verbal and/or interactive visual instruction from remote locations to parents installing car seats, paralleling the model of centralized Poison Control centers in the United States.

  19. Photovoltaic-Powered Vaccine Refrigerator: Freezer Systems Field Test Results

    NASA Technical Reports Server (NTRS)

    Ratajczak, A. F.

    1985-01-01

    A project to develop and field test photovoltaic-powered refrigerator/freezers suitable for vaccine storage was undertaken. Three refrigerator/freezers were qualified; one by Solar Power Corp. and two by Solvolt. Follow-on contracts were awarded for 19 field test systems and for 10 field test systems. A total of 29 systems were installed in 24 countries between October 1981 and October 1984. The project, systems descriptions, installation experiences, performance data for the 22 systems for which field test data was reported, an operational reliability summary, and recommendations relative to system designs and future use of such systems are explained. Performance data indicate that the systems are highly reliable and are capable of maintaining proper vaccine storage temperatures in a wide range of climatological and user environments.

  20. Ultrasonic humidification for telecommunications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Longo, F.

    1994-03-01

    This article examines two installations which demonstrate that ultrasonic humidification is an excellent option for large-scale commercial installations. Many existing telephone switching centers constructed 20 to 30 years ago were equipped with electro-mechanical switching equipment that was not sensitive to humidity. Today's sophisticated solid-state telecommunications equipment requires specific levels of relative humidity to operate properly. Over the last several years, Einhorn Yaffee Prescott (formerly Rose Beaton + Rose) designed two of the largest ultrasonic humidification systems at telecommunications buildings located in Cheshire, Conn., and White Plains, N.Y. The Cheshire project was a retrofit to the existing system in a 1960smore » building; the White Plains project involved an upgrade to a totally new air handling system, including an ultrasonic humidification component, in a 1950s building.« less

  1. Study and development of an air conditioning system operating on a magnetic heat pump cycle (design and testing of flow directors)

    NASA Astrophysics Data System (ADS)

    Wang, Pao-Lien

    1992-09-01

    This report describes the fabrication, design of flow director, fluid flow direction analysis and testing of flow director of a magnetic heat pump. The objectives of the project are: (1) to fabricate a demonstration magnetic heat pump prototype with flow directors installed; and (2) analysis and testing of flow director and to make sure working fluid loops flow through correct directions with minor mixing. The prototype was fabricated and tested at the Development Testing Laboratory of Kennedy Space Center. The magnetic heat pump uses rear earth metal plates rotate in and out of a magnetic field in a clear plastic housing with water flowing through the rotor plates to provide temperature lift. Obtaining the proper water flow direction has been a problem. Flow directors were installed as flow barriers between separating point of two parallel loops. Function of flow directors were proven to be excellent both analytically and experimentally.

  2. Study and development of an air conditioning system operating on a magnetic heat pump cycle (design and testing of flow directors)

    NASA Technical Reports Server (NTRS)

    Wang, Pao-Lien

    1992-01-01

    This report describes the fabrication, design of flow director, fluid flow direction analysis and testing of flow director of a magnetic heat pump. The objectives of the project are: (1) to fabricate a demonstration magnetic heat pump prototype with flow directors installed; and (2) analysis and testing of flow director and to make sure working fluid loops flow through correct directions with minor mixing. The prototype was fabricated and tested at the Development Testing Laboratory of Kennedy Space Center. The magnetic heat pump uses rear earth metal plates rotate in and out of a magnetic field in a clear plastic housing with water flowing through the rotor plates to provide temperature lift. Obtaining the proper water flow direction has been a problem. Flow directors were installed as flow barriers between separating point of two parallel loops. Function of flow directors were proven to be excellent both analytically and experimentally.

  3. Analysis of edge density fluctuation measured by trial KSTAR beam emission spectroscopy systema)

    NASA Astrophysics Data System (ADS)

    Nam, Y. U.; Zoletnik, S.; Lampert, M.; Kovácsik, Á.

    2012-10-01

    A beam emission spectroscopy (BES) system based on direct imaging avalanche photodiode (APD) camera has been designed for Korea Superconducting Tokamak Advanced Research (KSTAR) and a trial system has been constructed and installed for evaluating feasibility of the design. The system contains two cameras, one is an APD camera for BES measurement and another is a fast visible camera for position calibration. Two pneumatically actuated mirrors were positioned at front and rear of lens optics. The front mirror can switch the measurement between edge and core region of plasma and the rear mirror can switch between the APD and the visible camera. All systems worked properly and the measured photon flux was reasonable as expected from the simulation. While the measurement data from the trial system were limited, it revealed some interesting characteristics of KSTAR plasma suggesting future research works with fully installed BES system. The analysis result and the development plan will be presented in this paper.

  4. Design challenges and coordination issues in hotel projects

    NASA Astrophysics Data System (ADS)

    Saunders, Melvin L., IV; Marsh, David

    2002-11-01

    The design of a Five Star hotel facility encompasses a myriad of design dilemmas. On the same note, the design of a One Star or Two Star hotel has many dilemmas of its own. The ability of an acoustical consultant, as an integral part of the design team, to recognize the differences between these types of projects can be the difference between a successful hotel project and miserable failure. Different quality hotels require different levels of design criteria. Proper coordination and timing between trades and installations, such as loudspeakers, ceiling coffers, chandeliers, sprinkler heads, and ductwork, is also very important for the success of the overall project. This paper will discuss techniques and methods to produce successful hotel projects, as well as various noise sources throughout these spaces. It will also highlight a number of tips learned through many hotel design experiences.

  5. Development of a cross-polarization scattering system for the measurement of internal magnetic fluctuations in the DIII-D tokamak

    DOE PAGES

    Rhodes, Terry L.; Peebles, William A.; Crocker, Neal A.; ...

    2014-08-05

    The design and performance of a new cross-polarization scattering (CPS) system for the localized measurement of internal magnetic fluctuations is presented. CPS is a process whereby magnetic fluctuations scatter incident electromagnetic radiation into a perpendicular polarization which is subsequently detected. A new CPS design that incorporates a unique scattering geometry was laboratory tested, optimized, and installed on the DIII-D tokamak. Plasma tests of signal-to-noise, polarization purity, and frequency response indicate proper functioning of the system. Lastly, CPS data show interesting features related to internal MHD perturbations known as sawteeth that are not observed on density fluctuations.

  6. Telecommunications administration standard

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gustwiller, K.D.

    1996-05-01

    The administration of telecommunications is critical to proper maintenance and operation. The intent is to be able to properly support telecommunications for the distribution of all information within a building/campus. This standard will provide a uniform administration scheme that is independent of applications, and will establish guidelines for owners, installers, designers and contractors. This standard will accommodate existing building wiring, new building wiring and outside plant wiring. Existing buildings may not readily adapt to all applications of this standard, but the requirement for telecommunications administration is applicable to all buildings. Administration of the telecommunications infrastructure includes documentation (labels, records, drawings,more » reports, and work orders) of cables, termination hardware, patching and cross-connect facilities, telecommunications rooms, and other telecommunications spaces (conduits, grounding, and cable pathways are documented by Facilities Engineering). The investment in properly documenting telecommunications is a worthwhile effort. It is necessary to adhere to these standards to ensure quality and efficiency for the operation and maintenance of the telecommunications infrastructure for Sandia National Laboratories.« less

  7. Optimization of Borehole Thermal Energy Storage System Design Using Comprehensive Coupled Simulation Models

    NASA Astrophysics Data System (ADS)

    Welsch, Bastian; Rühaak, Wolfram; Schulte, Daniel O.; Formhals, Julian; Bär, Kristian; Sass, Ingo

    2017-04-01

    Large-scale borehole thermal energy storage (BTES) is a promising technology in the development of sustainable, renewable and low-emission district heating concepts. Such systems consist of several components and assemblies like the borehole heat exchangers (BHE), other heat sources (e.g. solarthermics, combined heat and power plants, peak load boilers, heat pumps), distribution networks and heating installations. The complexity of these systems necessitates numerical simulations in the design and planning phase. Generally, the subsurface components are simulated separately from the above ground components of the district heating system. However, as fluid and heat are exchanged, the subsystems interact with each other and thereby mutually affect their performances. For a proper design of the overall system, it is therefore imperative to take into account the interdependencies of the subsystems. Based on a TCP/IP communication we have developed an interface for the coupling of a simulation package for heating installations with a finite element software for the modeling of the heat flow in the subsurface and the underground installations. This allows for a co-simulation of all system components, whereby the interaction of the different subsystems is considered. Furthermore, the concept allows for a mathematical optimization of the components and the operational parameters. Consequently, a finer adjustment of the system can be ensured and a more precise prognosis of the system's performance can be realized.

  8. Carpeting/Flooring: Revitalizing Carpets.

    ERIC Educational Resources Information Center

    Woolford, Alison; Hill, Michael

    2003-01-01

    With properly specified fiber and a comprehensive maintenance program, school carpets can retain their appearance longer. Discusses carpet characteristics; proper carpet installation; effective preventive-maintenance programs (keep outside areas clean, use soil barriers, protect desk areas, maintain HVAC systems, and specify eating, drinking, and…

  9. Advanced Design Features of APR1400 and Realization in Shin Kori Construction Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    OH, S.J.; Park, K.C.; Kim, H.G.

    2006-07-01

    APR1400 adopted several advanced design features. To ensure their proper operation as a part of ShinKori 3,4 project, both experimental and analytical work are continuing. In this paper, work on the advanced design features related to enhanced safety is examined. APR1400 safety injection system consists of four independent trains which include four safety injection pump and tanks. A passive flow regulating device called fluidic device is installed in the safety injection tanks. Separate effect tests including a full scale fluidic device tests have been conducted. Integral system tests are in progress. Combination of these work with the analytical work usingmore » RELAP5/Mod3 would ensure the proper operation of the new safety injection systems. To mitigate severe accidents, hydrogen mitigation system using PARs and igniters is adopted. Also, active injection system and the streamlined insulation design are adopted to enhance the in-vessel retention capability with the external cooling of RPV strategy. Analytic work with supporting experiments is performed. We are certain that these preparatory work would help the successful adaptation of ADF in ShinKori project. (authors)« less

  10. 32 CFR 1903.7 - Trespassing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Trespassing. 1903.7 Section 1903.7 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.7 Trespassing. (a) Entering, or remaining on any Agency installation without proper...

  11. 32 CFR 1903.7 - Trespassing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Trespassing. 1903.7 Section 1903.7 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.7 Trespassing. (a) Entering, or remaining on any Agency installation without proper...

  12. 32 CFR 1903.7 - Trespassing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Trespassing. 1903.7 Section 1903.7 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.7 Trespassing. (a) Entering, or remaining on any Agency installation without proper...

  13. 32 CFR 1903.7 - Trespassing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Trespassing. 1903.7 Section 1903.7 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.7 Trespassing. (a) Entering, or remaining on any Agency installation without proper...

  14. 32 CFR 1903.7 - Trespassing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Trespassing. 1903.7 Section 1903.7 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.7 Trespassing. (a) Entering, or remaining on any Agency installation without proper...

  15. HVAC--the importance of clean intake section and dry air filter in cold climate.

    PubMed

    Hanssen, S O

    2004-01-01

    HVAC systems, if properly designed, installed, operated and maintained, will improve thermal conditions and air quality indoors. However, the success strongly depends on the design of the system and the quality of the components we use in our HVAC installations. Regrettably, several investigations have revealed that many HVAC installations have a lot of operational and maintenance problems, especially related to moisture, rain and snow entrainment. In short, it seems that too little attention is placed on the design of the intake section, despite the fact that there exists a large number of national and international guidelines and recommendations. This is a serious problem because the air intake is the initial component of the ventilation plant and as such the first line of defense against debris and other outdoor air pollutants. Unfortunately, the design is often an argued compromise between the architect, the civil engineer and the HVAC engineer. In the future, the technical, hygienic and microbiological feature of air intakes must be better ensured in order to avoid the air intake becoming a risk component as regards contamination and indoor air quality. Further, it seems that the magnitude of the problem is not well known, or recognized, by the building designers, engineers and professionals involved in the construction and operation of buildings. This fact needs to be addressed more seriously, because obviously there is a big difference between the idealistic architectonic design, engineering intentions and the real life situation. Several practical recommendations for design and operation of HVAC systems are presented. Following the recommendations will result in less pollution from the HVAC-system and increased indoor environmental quality.

  16. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Richards, Elizabeth H.; Schindel, Kay; Bosiljevac, Tom

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systemsmore » are properly specified and installed with respect to the continuing structural integrity of the building.« less

  17. Improved corrosion control by coating in the splash zone and subsea

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John, R.C.; VanHooff, W.

    1989-01-01

    The splash zone around offshore structures is without doubt one of nature's most hostile and corrosive environments. Apart from the wave impacts, plentiful supplies of oxygen, lack of cathodic protection, and the salt spray that continually wets and then dries upon objects, the region is difficult and sometimes dangerous to access. This article reviews the performance of two new offshore repair coatings recently installed on North Sea and Gulf of Mexico installations. The first coating, a reinforced heat-shrinkable sleeve, is designed to be installed over properly cleaned and dried steel surfaces. Suitable conditions for the application of this coating existmore » during low tide and calm weather when certain exposed sections of the splash zone are accessible. Alternatively, by using a special remote-controlled cofferdam chamber to create an artificial local environment, subsea coating application can proceed under ideal conditions. Cofferdam chamber installations are diver-free and can be made throughout the entire splash zone, even during rough weather. When a remote-controlled cofferdam is not available and repairs are needed in subsea or wet areas, diver assistance is usually required. The second coating system, a gel-based, diver-applied tape, has been developed specifically for such applications.« less

  18. Design of a magnetic shielding system for the time of flight enhanced diagnostics neutron spectrometer at Experimental Advanced Superconducting Tokamak

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cui, Z. Q.; Chen, Z. J.; Xie, X. F.

    2014-11-15

    The novel neutron spectrometer TOFED (Time of Flight Enhanced Diagnostics), comprising 90 individual photomultiplier tubes coupled with 85 plastic scintillation detectors through light guides, has been constructed and installed at Experimental Advanced Superconducting Tokamak. A dedicated magnetic shielding system has been constructed for TOFED, and is designed to guarantee the normal operation of photomultiplier tubes in the stray magnetic field leaking from the tokamak device. Experimental measurements and numerical simulations carried out employing the finite element method are combined to optimize the design of the magnetic shielding system. The system allows detectors to work properly in an external magnetic fieldmore » of 200 G.« less

  19. Strategic sensor locations of FPR bridge decks

    NASA Astrophysics Data System (ADS)

    Wu, Hwai-Chung; Warnemuende, Kraig; Yan, An; Mu, Bin

    2003-07-01

    Advanced fiber-reinforced polymer composite (FRP) has been increasingly used in bridge deck to replace concrete or steel. A FRP bridge deck can be designed to meet AASHTO HS-25 load requirements. FRP decks have many advantages over the conventional reinforced concrete or steel decks owing to their lightweight, high strength and corrosion resistance. However, such new deck system requires extensive monitoring to ensure its designed performance before its widespread acceptance by the bridge community. For inspection and evaluation purpose, a proper monitoring system consisting of various kinds of sensors installed in the FRP deck is critical. This paper provides a framework for designing an efficient monitoring system. The strategic sensor locations are identified based on the stress analysis of the FRP deck.

  20. 7 CFR 1924.253 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) Serious defects in or improper installation of heating systems or central air conditioning. (4) Defects in... CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.253 Definitions. As used in..., smoke detectors, railings, etc., as well as failure to provide or properly install devices to aid...

  1. 7 CFR 1924.253 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) Serious defects in or improper installation of heating systems or central air conditioning. (4) Defects in... CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.253 Definitions. As used in..., smoke detectors, railings, etc., as well as failure to provide or properly install devices to aid...

  2. 7 CFR 1924.253 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) Serious defects in or improper installation of heating systems or central air conditioning. (4) Defects in... CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.253 Definitions. As used in..., smoke detectors, railings, etc., as well as failure to provide or properly install devices to aid...

  3. 7 CFR 1924.253 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) Serious defects in or improper installation of heating systems or central air conditioning. (4) Defects in... CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.253 Definitions. As used in..., smoke detectors, railings, etc., as well as failure to provide or properly install devices to aid...

  4. Assessing tether anchor labeling and usability in pickup trucks.

    PubMed

    Klinich, Kathleen D; Manary, Miriam A; Malik, Laura A; Flannagan, Carol A; Jermakian, Jessica S

    2018-04-03

    The objective of this study was to investigate vehicle factors associated with child restraint tether use and misuse in pickup trucks and evaluate 4 labeling interventions designed to educate consumers on proper tether use. Volunteer testing was performed with 24 subjects and 4 different pickup trucks. Each subject performed 8 child restraint installations among the 4 pickups using 2 forward-facing restraints: a Britax Marathon G4.1 and an Evenflo Triumph. Vehicles were selected to represent 4 different implementations of tether anchors among pickups: plastic loop routers (Chevrolet Silverado), webbing routers (Ram), back wall anchors (Nissan Frontier), and webbing routers plus metal anchors (Toyota Tundra). Interventions included a diagram label, Quick Response (QR) Code linked to video instruction, coordinating text label, and contrasting text tag. Subjects used the child restraint tether in 93% of trials. However, tether use was completely correct in only 9% of trials. An installation was considered functional if the subject attached the tether to a tether anchor and had a tight installation (ignoring routing and head restraint position); 28% of subjects achieved a functional installation. The most common installation error was attaching the tether hook to the anchor/router directly behind the child restraint (near the top of the seatback) rather than placing the tether through the router and attaching it to the anchor in the adjacent seating position. The Nissan Frontier, with the anchor located on the back wall of the cab, had the highest rate of correct installations but also had the highest rate of attaching the tether to components other than the tether anchor (seat adjustor, child restraint storage hook, around head restraint). None of the labeling interventions had a significant effect on correct installation; not a single subject scanned the QR Code to access the video instruction. Subjects with the most successful installations spent extensive time reviewing the vehicle manuals. Current implementations of tether anchors among pickup trucks are not intuitive for child restraint installations, and alternate designs should be explored. Several different labeling interventions were ineffective at achieving correct tether use in pickup trucks.

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fazalare, R.W.; Hayes, S.J.

    One decision hydro project designers and developers make when building a new facility is what method to use to embed the turbine spiral case in the powerhouse concrete. The type of technique chosen often is based on the long-standing practice or individual preference of the plant owner. However, according to a recent industry survey, any method can be used successfully if proper design and installation procedures are followed. Although pressurized embedment has been the prominent method in the past, especially in the US, the bare deflated casing method is gaining popularity throughout the world because it can reduce cost andmore » construction time. This method has been the primary technique used with apparent success in Japan and Scandinavia.« less

  6. Investigation of premature strip seal joint failures and recommendations for assuring proper strip seal joint installation: Bridge 5/104W.

    DOT National Transportation Integrated Search

    2015-08-01

    This document summarizes an investigation that was performed to identify the cause(s) of premature failures of : strip seal expansion joints that were installed on WSDOT Bridge No. 5/104W. The document also includes recommendations : for assuring pro...

  7. ARTS: automated randomization of multiple traits for study design.

    PubMed

    Maienschein-Cline, Mark; Lei, Zhengdeng; Gardeux, Vincent; Abbasi, Taimur; Machado, Roberto F; Gordeuk, Victor; Desai, Ankit A; Saraf, Santosh; Bahroos, Neil; Lussier, Yves

    2014-06-01

    Collecting data from large studies on high-throughput platforms, such as microarray or next-generation sequencing, typically requires processing samples in batches. There are often systematic but unpredictable biases from batch-to-batch, so proper randomization of biologically relevant traits across batches is crucial for distinguishing true biological differences from experimental artifacts. When a large number of traits are biologically relevant, as is common for clinical studies of patients with varying sex, age, genotype and medical background, proper randomization can be extremely difficult to prepare by hand, especially because traits may affect biological inferences, such as differential expression, in a combinatorial manner. Here we present ARTS (automated randomization of multiple traits for study design), which aids researchers in study design by automatically optimizing batch assignment for any number of samples, any number of traits and any batch size. ARTS is implemented in Perl and is available at github.com/mmaiensc/ARTS. ARTS is also available in the Galaxy Tool Shed, and can be used at the Galaxy installation hosted by the UIC Center for Research Informatics (CRI) at galaxy.cri.uic.edu. © The Author 2014. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  8. Packaging - Materials review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Herrmann, Matthias

    2014-06-16

    Nowadays, a large number of different electrochemical energy storage systems are known. In the last two decades the development was strongly driven by a continuously growing market of portable electronic devices (e.g. cellular phones, lap top computers, camcorders, cameras, tools). Current intensive efforts are under way to develop systems for automotive industry within the framework of electrically propelled mobility (e.g. hybrid electric vehicles, plug-in hybrid electric vehicles, full electric vehicles) and also for the energy storage market (e.g. electrical grid stability, renewable energies). Besides the different systems (cell chemistries), electrochemical cells and batteries were developed and are offered in manymore » shapes, sizes and designs, in order to meet performance and design requirements of the widespread applications. Proper packaging is thereby one important technological step for designing optimum, reliable and safe batteries for operation. In this contribution, current packaging approaches of cells and batteries together with the corresponding materials are discussed. The focus is laid on rechargeable systems for industrial applications (i.e. alkaline systems, lithium-ion, lead-acid). In principle, four different cell types (shapes) can be identified - button, cylindrical, prismatic and pouch. Cell size can be either in accordance with international (e.g. International Electrotechnical Commission, IEC) or other standards or can meet application-specific dimensions. Since cell housing or container, terminals and, if necessary, safety installations as inactive (non-reactive) materials reduce energy density of the battery, the development of low-weight packages is a challenging task. In addition to that, other requirements have to be fulfilled: mechanical stability and durability, sealing (e.g. high permeation barrier against humidity for lithium-ion technology), high packing efficiency, possible installation of safety devices (current interrupt device, valve, etc.), chemical inertness, cost issues, and others. Finally, proper cell design has to be considered for effective thermal management (i.e. cooling and heating) of battery packs.« less

  9. Strain gage installation and survivability on geosynthetics used in flexible pavements

    NASA Astrophysics Data System (ADS)

    Brooks, Jeremy A.

    The use of foil type strain gages on geosynthetics is poorly documented. In addition, very few individuals are versed in proper installation techniques or calibration methods. Due to the limited number of knowledgeable technicians there is no information regarding the susceptibility of theses gages to errors in installation by inexperienced installers. Also lacking in the documentation related to the use of foil type strain gages on geosynthetics is the survivability of the gages in field conditions. This research documented procedures for installation, calibration, and survivability used by the project team to instruments a full scale field installation in Marked Tree, AR. This research also addressed sensitivity to installation errors on both geotextile and geogrid. To document the process of gage installation an experienced technician, Mr. Joe Ables, formerly of the UASCE Waterways Experiment Station, was consulted. His techniques were combined with those discovered in related literature and those developed by the research team to develop processes that were adaptable to multiple gage geometries and parent geosynthetics. These processes were described and documented in a step by step manner with accompanying photographs, which should allow virtually anyone with basic electronics knowledge to install these gages properly. Calibration of the various geosynthetic / strain gage combinations was completed using wide width tensile testing on multiple samples of each material. The tensile testing process was documented and analyzed using digital photography to analyze strain on the strain gage itself. Calibration factors for each geosynthtics used in the full scale field testing were developed. In addition, the process was thoroughly documented to allow future researchers to calibrate additional strain gage and geosynthetic combinations. The sensitivity of the strain gages to installation errors was analyzed using wide width tensile testing and digital photography to determine the variability of the data collected from gages with noticeable installation errors as compared to properly installed gages. Induced errors varied based on the parent geosynthetics material, but included excessive and minimal waterproofing, gage rotation, gage shift, excessive and minimal adhesive, and excessive and minimal adhesive impregnation loads. The results of this work indicated that minor errors in geotextile gage installation that are noticeable and preventable by the experienced installer have no statistical significance on the data recorded during the life span of geotextile gages; however the lifespan of the gage may be noticeably shortened by such errors. Geogrid gage installation errors were found to cause statistically significant changes in the data recorded from improper installations. The issue of gage survivability was analyzed using small scale test sections instrumented and loaded similarly to field conditions anticipated during traditional roadway construction. Five methods of protection were tested for both geotextile and geogrid including a sand blanket, inversion, semi-hemispherical PCV sections, neoprene mats, and geosynthetic wick drain. Based on this testing neoprene mats were selected to protect geotextile installed gages, and wick drains were selected to protect geogrid installed gages. These methods resulted in survivability rates of 73% and 100% in the full scale installation respectively. This research and documentation may be used to train technicians to install and calibrate geosynthetic mounted foil type strain gages. In addition, technicians should be able to install gages in the field with a high probability of gage survivability using the protection methods recommended.

  10. Power quality considerations for nuclear spectroscopy applications: Grounding

    NASA Astrophysics Data System (ADS)

    García-Hernández, J. M.; Ramírez-Jiménez, F. J.; Mondragón-Contreras, L.; López-Callejas, R.; Torres-Bribiesca, M. A.; Peña-Eguiluz, R.

    2013-11-01

    Traditionally the electrical installations are designed for supplying power and to assure the personnel safety. In nuclear analysis laboratories, additional issues about grounding also must be considered for proper operation of high resolution nuclear spectroscopy systems. This paper shows the traditional ways of grounding nuclear spectroscopy systems and through different scenarios, it shows the effects on the more sensitive parameter of these systems: the energy resolution, it also proposes the constant monitoring of a power quality parameter as a way to preserve or to improve the resolution of the systems, avoiding the influence of excessive extrinsic noise.

  11. Heat pipe thermal conditioning panel

    NASA Technical Reports Server (NTRS)

    Saaski, E. W.; Loose, J. D.; Mccoy, K. E.

    1974-01-01

    Thermal control of electronic hardware and experiments on future space vehicles is critical to proper functioning and long life. Thermal conditioning panels (cold plates) are a baseline control technique in current conceptual studies. Heat generating components mounted on the panels are typically cooled by fluid flowing through integral channels within the panel. However, replacing the pumped fluid coolant loop within the panel with heat pipes offers attractive advantages in weight, reliability, and installation. This report describes the development and fabrication of two large 0.76 x 0.76 m heat pipe thermal conditioning panels to verify performance and establish the design concept.

  12. A self-instructional manual for installing low-cost/no-cost weatherization materials: Experimental validation with scouts

    PubMed Central

    Pavlovich, Mark; Greene, Brandon F.

    1984-01-01

    In this study, we describe the development and evaluation of a self-instructional program for installing 10 low-cost/no-cost weatherization materials (e.g., weatherstripping, caulking). This program was a weatherization and retrofit manual (WARM) providing step-by-step instructions and illustrations. Boy and Girl Scouts participated and used either the WARM or existing product instructions (EPI) to apply the materials. Scouts installed the materials properly only when they used the WARM. PMID:16795671

  13. TECHNETIUM RETENTION IN WTP LAW GLASS WITH RECYCLE FLOW-SHEET DM10 MELTER TESTING VSL-12R2640-1 REV 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abramowitz, Howard; Brandys, Marek; Cecil, Richard

    2012-12-11

    Melter tests were conducted to determine the retention of technetium and other volatiles in glass while processing simulated Low Activity Waste (LAW) streams through a DM10 melter equipped with a prototypical off-gas system that concentrates and recycles fluid effiuents back to the melter feed. To support these tests, an existing DM10 system installed at Vitreous State Laboratory (VSL) was modified to add the required recycle loop. Based on the Hanford Tank Waste Treatment and Immobilization Plant (WTP) LAW off-gas system design, suitably scaled versions of the Submerged Bed Scrubber (SBS), Wet Electrostatic Precipitator (WESP), and TLP vacuum evaporator were designed,more » built, and installed into the DM10 system. Process modeling was used to support this design effort and to ensure that issues associated with the short half life of the {sup 99m}Tc radioisotope that was used in this work were properly addressed and that the system would be capable of meeting the test objectives. In particular, this required that the overall time constant for the system was sufficiently short that a reasonable approach to steady state could be achieved before the {sup 99m}Tc activity dropped below the analytical limits of detection. The conceptual design, detailed design, flow sheet development, process model development, Piping and Instrumentation Diagram (P&ID) development, control system design, software design and development, system fabrication, installation, procedure development, operator training, and Test Plan development for the new system were all conducted during this project. The new system was commissioned and subjected to a series of shake-down tests before embarking on the planned test program. Various system performance issues that arose during testing were addressed through a series of modifications in order to improve the performance and reliability of the system. The resulting system provided a robust and reliable platform to address the test objectives.« less

  14. Photovoltaic module bypass diode encapsulation

    NASA Technical Reports Server (NTRS)

    Shepard, N. J., Jr.

    1983-01-01

    The design and processing techniques necessary to incorporate bypass diodes within the module encapsulant are presented. The Semicon PN junction diode cells were selected. Diode junction to heat spreader thermal resistance measurements, performed on a variety of mounted diode chip types and sizes, have yielded values which are consistently below 1 deg C per watt, but show some instability when thermally cycled over the temperature range from -40 to 150 deg C. Three representative experimental modules, each incorporating integral bypass diode/heat spreader assemblies of various sizes, were designed. Thermal testing of these modules enabled the formulation of a recommended heat spreader plate sizing relationship. The production cost of three encapsulated bypass diode/heat spreader assemblies were compared with similarly rated externally mounted packaged diodes. It is concluded that, when proper designed and installed, these bypass diode devices will improve the overall reliability of a terrestrial array over a 20 year design lifetime.

  15. Exploratory research for the development of a computer aided software design environment with the software technology program

    NASA Technical Reports Server (NTRS)

    Hardwick, Charles

    1991-01-01

    Field studies were conducted by MCC to determine areas of research of mutual interest to MCC and JSC. NASA personnel from the Information Systems Directorate and research faculty from UHCL/RICIS visited MCC in Austin, Texas to examine tools and applications under development in the MCC Software Technology Program. MCC personnel presented workshops in hypermedia, design knowledge capture, and design recovery on site at JSC for ISD personnel. The following programs were installed on workstations in the Software Technology Lab, NASA/JSC: (1) GERM (Graphic Entity Relations Modeler); (2) gIBIS (Graphic Issues Based Information System); and (3) DESIRE (Design Recovery tool). These applications were made available to NASA for inspection and evaluation. Programs developed in the MCC Software Technology Program run on the SUN workstation. The programs do not require special configuration, but they will require larger than usual amounts of disk space and RAM to operate properly.

  16. Vinyl by design: creating interior spaces that stand the test of time.

    PubMed

    2002-01-01

    Managing design liability, avoiding risk and providing successful buildings are founded upon a conscious awareness of many important details. A key component of a designer's professionalism is understanding potential problems before they occur and proactively specifying the solutions to them. Familiarity with the inherent characteristics of any building material, along with the performance capabilities of specifiable products made with that material, aids in this process. Documenting the selection of a product in the project specifications should take this understanding into account. Knowing the important role of proper product installation--and, where necessary, calling upon the expertise of product manufacturers--should not be underestimated. Each part of the process has a major impact on whether the interior spaces delivered to a building owner provide lasting gratification, value, user satisfaction and recognition of the design professional's strategic importance to the project's overall success.

  17. Pipeline bottoming cycle study. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-06-01

    The technical and economic feasibility of applying bottoming cycles to the prime movers that drive the compressors of natural gas pipelines was studied. These bottoming cycles convert some of the waste heat from the exhaust gas of the prime movers into shaft power and conserve gas. Three typical compressor station sites were selected, each on a different pipeline. Although the prime movers were different, they were similar enough in exhaust gas flow rate and temperature that a single bottoming cycle system could be designed, with some modifications, for all three sites. Preliminary design included selection of the bottoming cycle workingmore » fluid, optimization of the cycle, and design of the components, such as turbine, vapor generator and condensers. Installation drawings were made and hardware and installation costs were estimated. The results of the economic assessment of retrofitting bottoming cycle systems on the three selected sites indicated that profitability was strongly dependent upon the site-specific installation costs, how the energy was used and the yearly utilization of the apparatus. The study indicated that the bottoming cycles are a competitive investment alternative for certain applications for the pipeline industry. Bottoming cycles are technically feasible. It was concluded that proper design and operating practices would reduce the environmental and safety hazards to acceptable levels. The amount of gas that could be saved through the year 2000 by the adoption of bottoming cycles for two different supply projections was estimated as from 0.296 trillion ft/sup 3/ for a low supply projection to 0.734 trillion ft/sup 3/ for a high supply projection. The potential market for bottoming cycle equipment for the two supply projections varied from 170 to 500 units of varying size. Finally, a demonstration program plan was developed.« less

  18. REACT: Resettable Hold Down and Release Actuator for Space Applications

    NASA Astrophysics Data System (ADS)

    Nava, Nestor; Collado, Marcelo; Cabás, Ramiro

    2014-07-01

    A new HDRA based on SMA technology, called REACT, has been designed for development of loads and appendixes in space applications. This design involves a rod supported by spheres that block its axial movement during a preload application. The rod shape allows misalignment and blocks the rotation around axial axis for a proper installation of the device. Because of the high preload requirements for this type of actuators, finite element analysis (FEA) has been developed in order to check the structure resistance. The results of the FEA have constrained the REACT design, in terms of dimensions, materials, and shape of the mechanical parts. A complete test campaign for qualification of REACT is proposed. Several qualification models are intended to be built for testing in parallel. Therefore, it is a way to demonstrate margins which allows getting some statistics.

  19. Upgrade of Langmuir probe diagnostic in ITER-like tungsten mono-block divertor on experimental advanced superconducting tokamak.

    PubMed

    Xu, J C; Wang, L; Xu, G S; Luo, G N; Yao, D M; Li, Q; Cao, L; Chen, L; Zhang, W; Liu, S C; Wang, H Q; Jia, M N; Feng, W; Deng, G Z; Hu, L Q; Wan, B N; Li, J; Sun, Y W; Guo, H Y

    2016-08-01

    In order to withstand rapid increase in particle and power impact onto the divertor and demonstrate the feasibility of the ITER design under long pulse operation, the upper divertor of the EAST tokamak has been upgraded to actively water-cooled, ITER-like tungsten mono-block structure since the 2014 campaign, which is the first attempt for ITER on the tokamak devices. Therefore, a new divertor Langmuir probe diagnostic system (DivLP) was designed and successfully upgraded on the tungsten divertor to obtain the plasma parameters in the divertor region such as electron temperature, electron density, particle and heat fluxes. More specifically, two identical triple probe arrays have been installed at two ports of different toroidal positions (112.5-deg separated toroidally), which can provide fundamental data to study the toroidal asymmetry of divertor power deposition and related 3-dimension (3D) physics, as induced by resonant magnetic perturbations, lower hybrid wave, and so on. The shape of graphite tip and fixed structure of the probe are designed according to the structure of the upper tungsten divertor. The ceramic support, small graphite tip, and proper connector installed make it possible to be successfully installed in the very narrow interval between the cassette body and tungsten mono-block, i.e., 13.5 mm. It was demonstrated during the 2014 and 2015 commissioning campaigns that the newly upgraded divertor Langmuir probe diagnostic system is successful. Representative experimental data are given and discussed for the DivLP measurements, then proving its availability and reliability.

  20. Upgrade of Langmuir probe diagnostic in ITER-like tungsten mono-block divertor on experimental advanced superconducting tokamak

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Xu, J. C.; Jia, M. N.; Feng, W.

    2016-08-15

    In order to withstand rapid increase in particle and power impact onto the divertor and demonstrate the feasibility of the ITER design under long pulse operation, the upper divertor of the EAST tokamak has been upgraded to actively water-cooled, ITER-like tungsten mono-block structure since the 2014 campaign, which is the first attempt for ITER on the tokamak devices. Therefore, a new divertor Langmuir probe diagnostic system (DivLP) was designed and successfully upgraded on the tungsten divertor to obtain the plasma parameters in the divertor region such as electron temperature, electron density, particle and heat fluxes. More specifically, two identical triplemore » probe arrays have been installed at two ports of different toroidal positions (112.5-deg separated toroidally), which can provide fundamental data to study the toroidal asymmetry of divertor power deposition and related 3-dimension (3D) physics, as induced by resonant magnetic perturbations, lower hybrid wave, and so on. The shape of graphite tip and fixed structure of the probe are designed according to the structure of the upper tungsten divertor. The ceramic support, small graphite tip, and proper connector installed make it possible to be successfully installed in the very narrow interval between the cassette body and tungsten mono-block, i.e., 13.5 mm. It was demonstrated during the 2014 and 2015 commissioning campaigns that the newly upgraded divertor Langmuir probe diagnostic system is successful. Representative experimental data are given and discussed for the DivLP measurements, then proving its availability and reliability.« less

  1. Practical aspects of instrumentation system installation, volume 13

    NASA Technical Reports Server (NTRS)

    Borek, R. W.; Pool, A. (Editor); Sanderson, K. C. (Editor)

    1981-01-01

    A review of factors influencing installation of aircraft flight test instrumentation is presented. Requirements, including such factors as environment, reliability, maintainability, and system safety are discussed. The assessment of the mission profile is followed by an overview of electrical and mechanical installation factors with emphasis on shock/vibration isolation systems and standardization of the electric wiring installation, two factors often overlooked by instrumentation engineers. A discussion of installation hardware reviews the performance capabilities of wiring, connectors, fuses and circuit breakers, and a guide to proper selections is provided. The discussion of the installation is primarily concerned with the electrical wire routing, shield terminations and grounding. Also inclued are some examples of installation mistakes that could affect system accuracy. System verification procedures and special considerations such as sneak circuits, pyrotechnics, aircraft antenna patterns, and lightning strikes are discussed.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, W.N.

    This report summarizes measured performance of residential geothermal heat pumps (GHP`s) that were installed in family housing units at Ft. Hood, Texas and at Selfridge Air National Guard base in Michigan. These units were built as part of a joint Department of Defense/Department of Energy program to evaluate the energy savings potential of GHP`s installed at military facilities. At the Ft. Hood site, the GHP performance was compared to conventional forced air electric air conditioning and natural gas heating. At Selfridge, the homes under test were originally equipped with electric baseboard heat and no air conditioning. Installation of the GHPmore » systems at both sites was straightforward but more problems and costs were incurred at Selfridge because of the need to install ductwork in the homes. The GHP`s at both sites produced impressive energy savings. These savings approached 40% for most of the homes tested. The low cost of energy on these bases relative to the incremental cost of the GHP conversions precludes rapid payback of the GHP`s from energy savings alone. Estimates based on simple payback (no inflation and no interest on capital) indicated payback times from 15 to 20 years at both sites. These payback times may be reduced by considering the additional savings possible due to reduced maintenance costs. Results are summarized in terms of 15 minute, hourly, monthly, and annual performance parameters. The results indicate that all the systems were working properly but several design shortcomings were identified. Recommendations are made for improvements in future installations at both sites.« less

  3. Understanding, Classifying, and Selecting Environmentally Acceptable Hydraulic Fluids

    DTIC Science & Technology

    2016-08-01

    installed in land facilities or off- road vehicles such as excavators, bulldozers, backhoes, etc.), while others are installed on floating plants...and oily bilge tanks for the collection and proper disposal of oil- contaminated bilge water • Performing routine maintenance , including regular...regulations. Maintenance of machinery systems containing EA hydraulic fluids must strictly follow the hydraulic fluid manufacturer’s recommendations

  4. Ultrasonic Method for Deployment Mechanism Bolt Element Preload Verification

    NASA Technical Reports Server (NTRS)

    Johnson, Eric C.; Kim, Yong M.; Morris, Fred A.; Mitchell, Joel; Pan, Robert B.

    2014-01-01

    Deployment mechanisms play a pivotal role in mission success. These mechanisms often incorporate bolt elements for which a preload within a specified range is essential for proper operation. A common practice is to torque these bolt elements to a specified value during installation. The resulting preload, however, can vary significantly with applied torque for a number of reasons. The goal of this effort was to investigate ultrasonic methods as an alternative for bolt preload verification in such deployment mechanisms. A family of non-explosive release mechanisms widely used by satellite manufacturers was chosen for the work. A willing contractor permitted measurements on a sampling of bolt elements for these release mechanisms that were installed by a technician following a standard practice. A variation of approximately 50% (+/- 25%) in the resultant preloads was observed. An alternative ultrasonic method to set the preloads was then developed and calibration data was accumulated. The method was demonstrated on bolt elements installed in a fixture instrumented with a calibrated load cell and designed to mimic production practice. The ultrasonic method yielded results within +/- 3% of the load cell reading. The contractor has since adopted the alternative method for its future production. Introduction

  5. 32 CFR 770.55 - Responsibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ACCESS TO PARTICULAR INSTALLATIONS Entry Regulations for Portsmouth Naval Shipyard, Portsmouth, New Hampshire § 770.55 Responsibility. The responsibility for proper identification and control of personnel and...

  6. 32 CFR 770.55 - Responsibility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ACCESS TO PARTICULAR INSTALLATIONS Entry Regulations for Portsmouth Naval Shipyard, Portsmouth, New Hampshire § 770.55 Responsibility. The responsibility for proper identification and control of personnel and...

  7. 32 CFR 770.55 - Responsibility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ACCESS TO PARTICULAR INSTALLATIONS Entry Regulations for Portsmouth Naval Shipyard, Portsmouth, New Hampshire § 770.55 Responsibility. The responsibility for proper identification and control of personnel and...

  8. 32 CFR 770.55 - Responsibility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ACCESS TO PARTICULAR INSTALLATIONS Entry Regulations for Portsmouth Naval Shipyard, Portsmouth, New Hampshire § 770.55 Responsibility. The responsibility for proper identification and control of personnel and...

  9. 32 CFR 770.55 - Responsibility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ACCESS TO PARTICULAR INSTALLATIONS Entry Regulations for Portsmouth Naval Shipyard, Portsmouth, New Hampshire § 770.55 Responsibility. The responsibility for proper identification and control of personnel and...

  10. Ballast water treatment systems: design, regulations, and selection under the choice varying priorities.

    PubMed

    Satir, Tanzer

    2014-09-01

    This paper investigates the role of ballast water treatment systems (BWTSs) and proposes a selection procedure for conventional merchant ships based on the financial, legal, and operational circumstances. Through the metallurgical revolution of the nineteenth century, commercial ships are converted to steel hull from wooden structures. By this innovative shift, use of ballast water became an essential part of ships for improving propulsion and stability while reducing stress on hull (instead of rocks). However, the content of ballast water is emerged since it relocates marine species from an ecological composition (usually cargo discharging port) to another one (loading port). Uncontrolled relocation of marine species may cause severe damage to existing ecological basis on ballast discharging area. BWTSs are developed for ships to eliminate marine species (i.e., aquatic invasive species) content by using a filtering device. It ensures an eco-friendly ballasting and de-ballasting process. The selection of proper BWTS is another debate since the BWTSs are designed with cost-quality and cost (eco)-performance variations. The proposed approach denoted that both tonnage and the age of ship are indicative factors on selection. The cost of installation varies based on installation space and active vs. project vessel cases.

  11. Composite correlation filter for O-ring detection in stationary colored noise

    NASA Astrophysics Data System (ADS)

    Hassebrook, Laurence G.

    2009-04-01

    O-rings are regularly replaced in aircraft and if they are not replaced or if they are installed improperly, they can result in catastrophic failure of the aircraft. It is critical that the o-rings be packaged correctly to avoid mistakes made by technicians during routine maintenance. For this reason, fines may be imposed on the o-ring manufacturer if the o-rings are packaged incorrectly. That is, a single o-ring must be packaged and labeled properly. No o-rings or more than one o-ring per package is not acceptable. We present an industrial inspection system based on real-time composite correlation filtering that has successfully solved this problem in spite of opaque paper o-ring packages. We present the system design including the composite filter design.

  12. Irrigation Controllers

    EPA Pesticide Factsheets

    With proper installation, programming, and maintenance, homeowners and businesses can use WaterSense labeled controllers instead of standard clock-timer controllers on their existing systems, and no longer worry about wasted water.

  13. Design of Installing Check Dam Using RAMMS Model in Seorak National Park of South Korea

    NASA Astrophysics Data System (ADS)

    Jun, K.; Tak, W.; JUN, B. H.; Lee, H. J.; KIM, S. D.

    2016-12-01

    Design of Installing Check Dam Using RAMMS Model in Seorak National Park of South Korea Kye-Won Jun*, Won-Jun Tak*, Byong-Hee Jun**, Ho-Jin Lee***, Soung-Doug Kim* *Graduate School of Disaster Prevention, Kangwon National University, 346 Joogang-ro, Samcheok-si, Gangwon-do, Korea **School of Fire and Disaster Protection, Kangwon National University, 346 Joogang-ro, Samcheok-si, Gangwon-do, Korea ***School of Civil Engineering, Chungbuk National University, 1 Chungdae-ro, Seowon-gu, Cheongju, Korea Abstract As more than 64% of the land in South Korea is mountainous area, so many regions in South Korea are exposed to the danger of landslide and debris flow. So it is important to understand the behavior of debris flow in mountainous terrains, the various methods and models are being presented and developed based on the mathematical concept. The purpose of this study is to investigate the regions that experienced the debris flow due to typhoon called Ewiniar and to perform numerical modeling to design and layout of the Check dam for reducing the damage by the debris flow. For the performance of numerical modeling, on-site measurement of the research area was conducted including: topographic investigation, research on bridges in the downstream, and precision LiDAR 3D scanning for composed basic data of numerical modeling. The numerical simulation of this study was performed using RAMMS (Rapid Mass Movements Simulation) model for the analysis of the debris flow. This model applied to the conditions of the Check dam which was installed in the upstream, midstream, and downstream. Considering the reduction effect of debris flow, the expansion of debris flow, and the influence on the bridges in the downstream, proper location of the Check dam was designated. The result of present numerical model showed that when the Check dam was installed in the downstream section, 50 m above the bridge, the reduction effect of the debris flow was higher compared to when the Check dam were installed in other sections. Key words: Debris flow, LiDAR, Check dam, RAMMSAcknowledgementsThis research was supported by a grant [MPSS-NH-2014-74] through the Disaster and Safety Management Institute funded by Ministry of Public Safety and Security of Korean government

  14. Towngas Lantau link beach approach, Hong Kong and China Gas Co. Ltd.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callnon, D.P.; Bertolucci, L.

    1997-07-01

    Horizontal directional drilling (HDD) laid dual, 12-in. OD, natural gas pipelines beneath a critical sea wall on Lantau island, Hong Kong New Territories. This was part of a 30-mile gas pipeline crossing under the South China Sea associated with the Towngas Lantau construction project for Hong Kong`s new Chep Lap Kok International Airport. During a twenty-one day project, Cherrington Corp. drilled and forward-reamed two, 20-in., 1,294-ft. holes to pull back the twin pipelines. The project was completed during typhoon weather, strong currents and logistical problems associated with operation in a remote uninhabited area. The successful installation of the twin gasmore » lines was the result of proper hole design, high-quality surveying techniques and innovative directional drilling methods. Each hole exited approximately 90-ft. from the pre-installed product pipe in the sea floor trench. A 20-in. reamer with bull-nose and rear stabilizer was used to open both holes from 9 to 20-inches.« less

  15. Earthquake Damping Device for Steel Frame

    NASA Astrophysics Data System (ADS)

    Zamri Ramli, Mohd; Delfy, Dezoura; Adnan, Azlan; Torman, Zaida

    2018-04-01

    Structures such as buildings, bridges and towers are prone to collapse when natural phenomena like earthquake occurred. Therefore, many design codes are reviewed and new technologies are introduced to resist earthquake energy especially on building to avoid collapse. The tuned mass damper is one of the earthquake reduction products introduced on structures to minimise the earthquake effect. This study aims to analyse the effectiveness of tuned mass damper by experimental works and finite element modelling. The comparisons are made between these two models under harmonic excitation. Based on the result, it is proven that installing tuned mass damper will reduce the dynamic response of the frame but only in several input frequencies. At the highest input frequency applied, the tuned mass damper failed to reduce the responses. In conclusion, in order to use a proper design of damper, detailed analysis must be carried out to have sufficient design based on the location of the structures with specific ground accelerations.

  16. Preliminary aerodynamic design considerations for advanced laminar flow aircraft configurations

    NASA Technical Reports Server (NTRS)

    Johnson, Joseph L., Jr.; Yip, Long P.; Jordan, Frank L., Jr.

    1986-01-01

    Modern composite manufacturing methods have provided the opportunity for smooth surfaces that can sustain large regions of natural laminar flow (NLF) boundary layer behavior and have stimulated interest in developing advanced NLF airfoils and improved aircraft designs. Some of the preliminary results obtained in exploratory research investigations on advanced aircraft configurations at the NASA Langley Research Center are discussed. Results of the initial studies have shown that the aerodynamic effects of configuration variables such as canard/wing arrangements, airfoils, and pusher-type and tractor-type propeller installations can be particularly significant at high angles of attack. Flow field interactions between aircraft components were shown to produce undesirable aerodynamic effects on a wing behind a heavily loaded canard, and the use of properly designed wing leading-edge modifications, such as a leading-edge droop, offset the undesirable aerodynamic effects by delaying wing stall and providing increased stall/spin resistance with minimum degradation of laminar flow behavior.

  17. Attitude Heading Reference System Using MEMS Inertial Sensors with Dual-Axis Rotation

    PubMed Central

    Kang, Li; Ye, Lingyun; Song, Kaichen; Zhou, Yang

    2014-01-01

    This paper proposes a low cost and small size attitude and heading reference system based on MEMS inertial sensors. A dual-axis rotation structure with a proper rotary scheme according to the design principles is applied in the system to compensate for the attitude and heading drift caused by the large gyroscope biases. An optimization algorithm is applied to compensate for the installation angle error between the body frame and the rotation table's frame. Simulations and experiments are carried out to evaluate the performance of the AHRS. The results show that the proper rotation could significantly reduce the attitude and heading drifts. Moreover, the new AHRS is not affected by magnetic interference. After the rotation, the attitude and heading are almost just oscillating in a range. The attitude error is about 3° and the heading error is less than 3° which are at least 5 times better than the non-rotation condition. PMID:25268911

  18. Hybrid PV/Wind Power Systems Incorporating Battery Storage and Considering the Stochastic Nature of Renewable Resources

    NASA Astrophysics Data System (ADS)

    Barnawi, Abdulwasa Bakr

    Hybrid power generation system and distributed generation technology are attracting more investments due to the growing demand for energy nowadays and the increasing awareness regarding emissions and their environmental impacts such as global warming and pollution. The price fluctuation of crude oil is an additional reason for the leading oil producing countries to consider renewable resources as an alternative. Saudi Arabia as the top oil exporter country in the word announced the "Saudi Arabia Vision 2030" which is targeting to generate 9.5 GW of electricity from renewable resources. Two of the most promising renewable technologies are wind turbines (WT) and photovoltaic cells (PV). The integration or hybridization of photovoltaics and wind turbines with battery storage leads to higher adequacy and redundancy for both autonomous and grid connected systems. This study presents a method for optimal generation unit planning by installing a proper number of solar cells, wind turbines, and batteries in such a way that the net present value (NPV) is minimized while the overall system redundancy and adequacy is maximized. A new renewable fraction technique (RFT) is used to perform the generation unit planning. RFT was tested and validated with particle swarm optimization and HOMER Pro under the same conditions and environment. Renewable resources and load randomness and uncertainties are considered. Both autonomous and grid-connected system designs were adopted in the optimal generation units planning process. An uncertainty factor was designed and incorporated in both autonomous and grid connected system designs. In the autonomous hybrid system design model, the strategy including an additional amount of operation reserve as a percent of the hourly load was considered to deal with resource uncertainty since the battery storage system is the only backup. While in the grid-connected hybrid system design model, demand response was incorporated to overcome the impact of uncertainty and perform energy trading between the hybrid grid utility and main grid utility in addition to the designed uncertainty factor. After the generation unit planning was carried out and component sizing was determined, adequacy evaluation was conducted by calculating the loss of load expectation adequacy index for different contingency criteria considering probability of equipment failure. Finally, a microgrid planning was conducted by finding the proper size and location to install distributed generation units in a radial distribution network.

  19. System Engineering Paper

    NASA Technical Reports Server (NTRS)

    Heise, James; Hull, Bethanne J.; Bauer, Jonathan; Beougher, Nathan G.; Boe, Caleb; Canahui, Ricardo; Charles, John P.; Cooper, Zachary Davis Job; DeShaw, Mark A.; Fontanella, Luan Gasparetto; hide

    2012-01-01

    The Iowa State University team, Team LunaCY, is composed of the following sub-teams: the main student organization, the Lunabotics Club; a senior mechanical engineering design course, ME 415; a senior multidisciplinary design course, ENGR 466; and a senior design course from Wartburg College in Waverly, Iowa. Team LunaCY designed and fabricated ART-E III, Astra Robotic Tractor- Excavator the Third, for the team's third appearance in the NASA Lunabotic Mining competition. While designing ART-E III, the team had four main goals for this year's competition:to reduce the total weight of the robot, to increase the amount of regolith simulant mined, to reduce dust, and to make ART-E III autonomous. After many designs and research, a final robot design was chosen that obtained all four goals of Team LunaCY. A few changes Team LunaCY made this year was to go to the electrical, computer, and software engineering club fest at Iowa State University to recruit engineering students to accomplish the task of making ART-E III autonomous. Team LunaCY chose to use LabView to program the robot and various sensors were installed to measure the distance between the robot and the surroundings to allow ART-E III to maneuver autonomously. Team LunaCY also built a testing arena to test prototypes and ART-E III in. To best replicate the competition arena at the Kennedy Space Center, a regolith simulant was made from sand, QuickCrete, and fly ash to cover the floor of the arena. Team LunaCY also installed fans to allow ventilation in the arena and used proper safety attire when working in the arena . With the additional practice in the testing arena and innovative robot design, Team LunaCY expects to make a strong appearance at the 2012 NASA Lunabotic Mining Competition. .

  20. 30 CFR 881.7 - Administration of contributions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... under a project contract between the State and its contractor for the construction, installation... project contract. The amounts claimed under each voucher shall be certified by the State as proper charges...

  1. Radar-cross-section reduction of wind turbines. part 1.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brock, Billy C.; Loui, Hung; McDonald, Jacob J.

    2012-03-05

    In recent years, increasing deployment of large wind-turbine farms has become an issue of growing concern for the radar community. The large radar cross section (RCS) presented by wind turbines interferes with radar operation, and the Doppler shift caused by blade rotation causes problems identifying and tracking moving targets. Each new wind-turbine farm installation must be carefully evaluated for potential disruption of radar operation for air defense, air traffic control, weather sensing, and other applications. Several approaches currently exist to minimize conflict between wind-turbine farms and radar installations, including procedural adjustments, radar upgrades, and proper choice of low-impact wind-farm sites,more » but each has problems with limited effectiveness or prohibitive cost. An alternative approach, heretofore not technically feasible, is to reduce the RCS of wind turbines to the extent that they can be installed near existing radar installations. This report summarizes efforts to reduce wind-turbine RCS, with a particular emphasis on the blades. The report begins with a survey of the wind-turbine RCS-reduction literature to establish a baseline for comparison. The following topics are then addressed: electromagnetic model development and validation, novel material development, integration into wind-turbine fabrication processes, integrated-absorber design, and wind-turbine RCS modeling. Related topics of interest, including alternative mitigation techniques (procedural, at-the-radar, etc.), an introduction to RCS and electromagnetic scattering, and RCS-reduction modeling techniques, can be found in a previous report.« less

  2. Laying the Groundwork.

    ERIC Educational Resources Information Center

    Kretchmer, Mark R.

    2000-01-01

    Discusses how to avoid costly errors in high-tech retrofits through proper planning and coordination. Guidelines are offered for selecting cable installers, using multi-disciplinary consulting engineering firm, and space planning when making high-tech retrofits. (GR)

  3. 78 FR 19689 - Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-02

    ... proposed collection of information is necessary for the proper performance of the functions of the agency....) but is not required for that person to be registered and gain access to the controlled installation...

  4. 30 CFR 250.130 - Why does MMS conduct inspections?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... approved Exploration Plan or Development and Production Plans; or right-of-use and easement, and other... blowouts, fires, spillages, or other major accidents has been installed and is operating properly according...

  5. A Mechanical Principle for Acquisition of useful Power on a Celestial Body Through Utilisation of its Planetary Precession

    NASA Astrophysics Data System (ADS)

    Vulkov, K.

    In consequence of the phenomenon of planetary precession there emerges a possibility for acquisition of power through utilisation of the rotary motions in the universe. The idea is to acquire useful power on the working shaft of a properly designed machine installed on a celestial body (planet), at the expense of the motional energy of the latter. Strange as it may appear, this is possible if only the regulation of the machine be brought in line with the parameters of the precession. The principle of action of such a planetary engine, including an energy balance, is put forward in the present paper.

  6. Wind cannot be Directed but Sails can be Adjusted for Malaysian Renewable Energy Progress

    NASA Astrophysics Data System (ADS)

    Palanichamy, C.; Nasir, Meseret; Veeramani, S.

    2015-04-01

    Wind energy has been the promising energy technology since 1980s in terms of percentage of yearly growth of installed capacity. However the progress of wind energy has not been evenly distributed around the world. Particularly, in South East Asian countries like Malaysia and Singapore, though the Governments are keen on promoting wind energy technology, it is not well practiced due to the low wind speeds. Owing to the recent advancements in wind turbine designs, even Malaysia is well suited for wind energy by proper choice of wind turbines. As evidence, this paper presents successful wind turbines with simulated study outcomes to encourage wind power developments in Malaysia.

  7. 24 CFR 3286.411 - Certifying installation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... manufactured home has been installed in accordance with: (i) An installation design and instructions that have... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in...; or (ii) An installation design and instructions that have been prepared and certified by a...

  8. 30 CFR 250.130 - Why does BSEE conduct inspections?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Exploration Plan or Development and Production Plans; or right-of-use and easement, and other applicable laws..., fires, spillages, or other major accidents has been installed and is operating properly according to the...

  9. 30 CFR 250.130 - Why does BSEE conduct inspections?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Exploration Plan or Development and Production Plans; or right-of-use and easement, and other applicable laws..., fires, spillages, or other major accidents has been installed and is operating properly according to the...

  10. 30 CFR 250.130 - Why does BSEE conduct inspections?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Exploration Plan or Development and Production Plans; or right-of-use and easement, and other applicable laws..., fires, spillages, or other major accidents has been installed and is operating properly according to the...

  11. Retrofitting Forced Air Combi Systems: A Cold Climate Field Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schoenbauer, Ben; Bohac, Dave; McAlpine, Jack

    This project analyzed combined condensing water heaters or boilers and hydronic air coils to provide high efficiency domestic hot water (DHW) and forced air space heating. Called "combi" systems, they provided similar space and water heating performance less expensively than installing two condensing appliances. The system's installed costs were cheaper than installing a condensing furnace and either a condensing tankless or condensing storage water heater. However, combi costs must mature and be reduced before they are competitive with a condensing furnace and power vented water heater (energy factor of 0.60). Better insulation and tighter envelopes are reducing space heating loadsmore » for new and existing homes. For many homes, decreased space heating loads make it possible for both space and domestic water heating loads to be provided with a single heating plant. These systems can also eliminate safety issues associated with natural draft appliances through the use of one common sealed combustion vent. The combined space and water heating approach was not a new idea. Past systems have used non-condensing heating plants, which limited their usefulness in climates with high heating loads. Previous laboratory work (Schoenbauer et al. 2012a) showed that proper installation was necessary to achieve condensing with high efficiency appliances. Careful consideration was paid to proper system sizing and minimizing the water temperature returning from the air handling unit to facilitate condensing operation.« less

  12. Retrofitting Forced Air Combi Systems: A Cold Climate Field Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schoenbauer, Ben; Bohac, Dave; McAlpine, Jake

    This project analyzed combined condensing water heaters or boilers and hydronic air coils to provide high efficiency domestic hot water (DHW) and forced air space heating. Called 'combi' systems, they provided similar space and water heating performance less expensively than installing two condensing appliances. The system's installed costs were cheaper than installing a condensing furnace and either a condensing tankless or condensing storage water heater. However, combi costs must mature and be reduced before they are competitive with a condensing furnace and power vented water heater (energy factor of 0.60). Better insulation and tighter envelopes are reducing space heating loadsmore » for new and existing homes. For many homes, decreased space heating loads make it possible for both space and domestic water heating loads to be provided with a single heating plant. These systems can also eliminate safety issues associated with natural draft appliances through the use of one common sealed combustion vent. The combined space and water heating approach was not a new idea. Past systems have used non-condensing heating plants, which limited their usefulness in climates with high heating loads. Previous laboratory work (Schoenbauer et al. 2012a) showed that proper installation was necessary to achieve condensing with high efficiency appliances. Careful consideration was paid to proper system sizing and minimizing the water temperature returning from the air handling unit to facilitate condensing operation.« less

  13. Implementation of the MPC and A Operations Monitorying (MOM) System at JSC PO Sevmas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Monogarov, A.; Taranenko, V.; Serov,A

    The Material Protection, Control and Accounting (MPC&A) Program has been working since 1994 with nuclear sites in Russia to upgrade the physical protection (PP) and material control and accounting (MC&A) functions at facilities containing weapons usable nuclear material. In early 2001, the MPC&A program initiated the MPC&A Operations Monitoring (MOM) Project to monitor facilities where MPC&A upgrades have been installed to provide increased confidence that personnel are present and vigilant, provide confidence that security procedures are being properly performed and provide additional assurance that nuclear materials have not been stolen. The MOM project began as a pilot project at themore » Moscow State Engineering Physics Institute (MEPhI) and a MOM system was successfully installed in October 2001. Following the success of the MEPhI pilot project, the MPC&A Program expanded the installation of MOM systems to several other Russian facilities, including the JSC 'PO' Sevmash', Severodvinsk, Russia. The MOM system was made operational at Sevmash in September, 2008. This paper will discuss the objectives of the MOM system installed at Sevmash and indicate how the objectives influenced the development of the conceptual design. The paper will also describe activities related to installation of the infrastructure and the MOM system at Sevmash. Experience gained from operation of the system and how the objectives are being met will also be discussed. The paper will describe how the MOM system is used at Sevmash and, in particular, how the data is analyzed. Finally, future activities including potential expansion of the MOM system, operator training, data sharing and analysis, procedure development, repair and maintenance will be included in the paper.« less

  14. Optimizing RF gun cavity geometry within an automated injector design system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alicia Hofler ,Pavel Evtushenko

    2011-03-28

    RF guns play an integral role in the success of several light sources around the world, and properly designed and optimized cw superconducting RF (SRF) guns can provide a path to higher average brightness. As the need for these guns grows, it is important to have automated optimization software tools that vary the geometry of the gun cavity as part of the injector design process. This will allow designers to improve existing designs for present installations, extend the utility of these guns to other applications, and develop new designs. An evolutionary algorithm (EA) based system can provide this capability becausemore » EAs can search in parallel a large parameter space (often non-linear) and in a relatively short time identify promising regions of the space for more careful consideration. The injector designer can then evaluate more cavity design parameters during the injector optimization process against the beam performance requirements of the injector. This paper will describe an extension to the APISA software that allows the cavity geometry to be modified as part of the injector optimization and provide examples of its application to existing RF and SRF gun designs.« less

  15. 24 CFR 3286.111 - Installer certification of installation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... manufactured home has been installed in accordance with: (i) An installation design and instructions that have... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Certification of Installation in HUD...; or (ii) An installation design and instructions that have been prepared and certified by a...

  16. The Logistics Of Installing Pacs In An Existing Medical Center

    NASA Astrophysics Data System (ADS)

    Saarinen, Allan O.; Goodsitt, Mitchell M.; Loop, John W.

    1989-05-01

    A largely overlooked issue in the Picture Archiving and Communication Systems (PACS) area is the tremendous amount of site planning activity required to install such a system in an existing medical center. Present PACS equipment requires significant hospital real estate, specialized electrical power, cabling, and environmental controls to operate properly. Marshaling the hospital resources necessary to install PACS equipment requires many different players. The site preparation costs are nontrivial and usually include a number of hidden expenses. This paper summarizes the experience of the University of Washington Department of Radiology in installing an extensive digital imaging network (DIN) and PACS throughout the Department and several clinics in the hospital. The major logistical problems encountered at the University are discussed, a few recommendations are made, and the installation costs are documented. Overall, the University's site preparation costs equalled about seven percent (7%) of the total PACS equipment expenditure at the site.

  17. Detection and localization of building insulation faults using optical-fiber DTS system

    NASA Astrophysics Data System (ADS)

    Papes, Martin; Liner, Andrej; Koudelka, Petr; Siska, Petr; Cubik, Jakub; Kepak, Stanislav; Jaros, Jakub; Vasinek, Vladimir

    2013-05-01

    Nowadays the trends in the construction industry are changing at an incredible speed. The new technologies are still emerging on the market. Sphere of building insulation is not an exception as well. One of the major problems in building insulation is usually its failure, whether caused by unwanted mechanical intervention or improper installation. The localization of these faults is quite difficult, often impossible without large intervention into the construction. As a proper solution for this problem might be utilization of Optical-Fiber DTS system based on stimulated Raman scattering. Used DTS system is primary designed for continuous measurement of the temperature along the optical fiber. This system is using standard optical fiber as a sensor, which brings several advantages in its application. First, the optical fiber is relatively inexpensive, which allows to cover a quite large area for a small cost. The other main advantages of the optical fiber are electromagnetic resistance, small size, safety operation in inflammable or explosive area, easy installation, etc. This article is dealing with the detection and localization of building insulation faults using mentioned system.

  18. Measure Guideline: Transitioning to a Tankless Water Heater

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brozyna, K.; Rapport, A.

    2012-09-01

    This Measure Guideline provides information to help residential builders and retrofitters with the design, specification, selection, implementation, installation, and maintenance issues of transitioning from tank-type water heaters to tankless water heaters. The report compares the differences between tankless and tank-type water heaters, highlighting the energy savings that can be realized by adopting tankless water heaters over tank-type water heaters. Selection criteria and risks discussed include unit sizing and location, water distribution system, plumbing line length and diameter, water quality, electrical backup, and code issues. Cost and performance data are provided for various types of tankless and tank-type water heaters, bothmore » natural gas fired and electric. Also considered are interactions between the tankless water heater and other functional elements of a house, such as cold water supply and low-flow devices. Operating costs and energy use of water distribution systems for single- and two-story houses are provided, along with discussion of the various types of distribution systems that can be used with tankless water heaters. Finally, details to prepare for proper installation of a tankless water heater are described.« less

  19. Experimental assessment of the potential to decrease diesel NOx emissions beyond minimum requirements for Euro 6 Real Drive Emissions (RDE) compliance.

    PubMed

    Triantafyllopoulos, Georgios; Katsaounis, Dimitrios; Karamitros, Dimitrios; Ntziachristos, Leonidas; Samaras, Zissis

    2018-03-15

    The objective of this study was to test the potential for NO x emissions improvements on a typical Euro 6 diesel vehicle, following modifications to its emissions control system, under Real Drive Emissions (RDE) testing conditions. A commercially available car was selected and was first measured in its original configuration according to RDE on the road and an initial conformity factor (CF) of 5.4 was determined. Subsequent engine calibration and installation of a Selective Catalytic Reduction (SCR) device were conducted and tested on a fully transient engine dyno setup, which precisely reproduced the engine operation under the on-road RDE test. The NO x reduction achieved with those upgrades was 90%, leading to a CF of 0.53, with no CO 2 or fuel consumption penalty. These findings demonstrate that diesel vehicles can reach low NO x levels under real world driving conditions, when well-designed modern exhaust aftertreatment components are installed and properly calibrated. Copyright © 2017 Elsevier B.V. All rights reserved.

  20. Mobilization Protocols for Hybrid Sensors for Environmental AOP Sampling (HySEAS) Observations

    NASA Technical Reports Server (NTRS)

    Hooker, Stanford B.

    2014-01-01

    The protocols presented here enable the proper mobilization of the latest-generation instruments for measuring the apparent optical properties (AOPs) of aquatic ecosystems. The protocols are designed for the Hybrid Sensors for Environmental AOP Sampling (HySEAS) class of instruments, but are applicable to the community of practice for AOP measurements. The protocols are organized into eleven sections beyond an introductory overview: a) cables and connectors, b) HySEAS instruments, c) platform preparation, d) instrument installation, e) cable installation, f) test deployment, g) test recovery, h) maintenance, i) shipping, j) storage, and k) smallboat operations. Each section concentrates on documenting how to prevent the most likely faults, remedy them should they occur, and accomplishing both with the proper application of a modest set of useful tools. Within the twelve sections, there are Socratic exercises to stimulate thought, and the answers to these exercises appear in Appendix A. Frequently asked questions (FAQs) are summarized in a separate section after the answers to the exercises in Appendix B. For practitioners unfamiliar with the nautical terms used throughout this document plus others likely encountered at sea, an abbreviated dictionary of nautical terms appears in Appendix C. An abbreviated dictionary of radiotelephone terms is presented in Appendix D. To ensure familiarity with many of the tools that are presented, Appendix E provides a description of the tools alongside a thumbnail picture. Abbreviated deployment checklists and cable diagrams are provided in Appendix F. The document concludes with an acknowledgments section, a glossary of acronyms, a definition of symbols, and a list of references.

  1. Emergency membrane contactor based absorption system for ammonia leaks in water treatment plants.

    PubMed

    Shao, Jiahui; Fang, Xuliang; He, Yiliang; Jin, Qiang

    2008-01-01

    Abstract Because of the suspected health risks of trihalomethanes (THMs), more and more water treatment plants have replaced traditional chlorine disinfection process with chloramines but often without the proper absorption system installed in the case of ammonia leaks in the storage room. A pilot plant membrane absorption system was developed and installed in a water treatment plant for this purpose. Experimentally determined contact angle, surface tension, and corrosion tests indicated that the sulfuric acid was the proper choice as the absorbent for leaking ammonia using polypropylene hollow fiber membrane contactor. Effects of several operating conditions on the mass transfer coefficient, ammonia absorption, and removal efficiency were examined, including the liquid concentration, liquid velocity, and feed gas concentration. Under the operation conditions investigated, the gas absorption efficiency over 99.9% was achieved. This indicated that the designed pilot plant membrane absorption system was effective to absorb the leaking ammonia in the model storage room. The removal rate of the ammonia in the model storage room was also experimentally and theoretically found to be primarily determined by the ammonia suction flow rate from the ammonia storage room to the membrane contactor. The ammonia removal rate of 99.9% was expected to be achieved within 1.3 h at the ammonia gas flow rate of 500 m3/h. The success of the pilot plant membrane absorption system developed in this study illustrated the potential of this technology for ammonia leaks in water treatment plant, also paved the way towards a larger scale application.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Winter, J.R.; Keywood, S.S.

    PTFE-based gaskets in chemical plant service typically fail in an extrusion mode, sometimes referred to as blowout. Test work previously published by Monsanto indicated that correctly installed PTFE-based gaskets have pressure performance far exceeding system pressure ratings. These results have since been confirmed by extensive testing at the Montreal based Ecole Polytechnique Tightness Testing and Research Laboratory (TTRL), funded by a consortium of gasket users and manufacturers. With the knowledge that properly installed gaskets can withstand system pressures in excess of 1,000 psig [6,894 kPa], failures at two chemical plants were re-examined. This analysis indicates that extrusion type failures canmore » be caused by excessive internal pressures, associated with sections of pipe having an external source of heat coincident with a blocked flow condition. This results in high system pressures which explain the extrusion type failures observed. The paper discusses details of individual failures and examines methods to prevent them. Other causes for extrusion failures are reviewed, with a recommendation that stronger gasket materials not be utilized to correct problems until it is verified that excessive pressure build-up is not the problem. Also summarized are the requirements for proper installation to achieve the potential blowout resistance found in these gaskets.« less

  3. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...

  4. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...

  5. Simulation, measurement, and emulation of photovoltaic modules using high frequency and high power density power electronic circuits

    NASA Astrophysics Data System (ADS)

    Erkaya, Yunus

    The number of solar photovoltaic (PV) installations is growing exponentially, and to improve the energy yield and the efficiency of PV systems, it is necessary to have correct methods for simulation, measurement, and emulation. PV systems can be simulated using PV models for different configurations and technologies of PV modules. Additionally, different environmental conditions of solar irradiance, temperature, and partial shading can be incorporated in the model to accurately simulate PV systems for any given condition. The electrical measurement of PV systems both prior to and after making electrical connections is important for attaining high efficiency and reliability. Measuring PV modules using a current-voltage (I-V) curve tracer allows the installer to know whether the PV modules are 100% operational. The installed modules can be properly matched to maximize performance. Once installed, the whole system needs to be characterized similarly to detect mismatches, partial shading, or installation damage before energizing the system. This will prevent any reliability issues from the onset and ensure the system efficiency will remain high. A capacitive load is implemented in making I-V curve measurements with the goal of minimizing the curve tracer volume and cost. Additionally, the increase of measurement resolution and accuracy is possible via the use of accurate voltage and current measurement methods and accurate PV models to translate the curves to standard testing conditions. A move from mechanical relays to solid-state MOSFETs improved system reliability while significantly reducing device volume and costs. Finally, emulating PV modules is necessary for testing electrical components of a PV system. PV emulation simplifies and standardizes the tests allowing for different irradiance, temperature and partial shading levels to be easily tested. Proper emulation of PV modules requires an accurate and mathematically simple PV model that incorporates all known system variables so that any PV module can be emulated as the design requires. A non-synchronous buck converter is proposed for the emulation of a single, high-power PV module using traditional silicon devices. With the proof-of-concept working and improvements in efficiency, power density and steady-state errors made, dynamic tests were performed using an inverter connected to the PV emulator. In order to improve the dynamic characteristics, a synchronous buck converter topology is proposed along with the use of advanced GaNFET devices which resulted in very high power efficiency and improved dynamic response characteristics when emulating PV modules.

  6. Helicopter vibration suppression using simple pendulum absorbers on the rotor blade

    NASA Technical Reports Server (NTRS)

    Pierce, G. A.; Hanouva, M. N. H.

    1982-01-01

    A comprehensive anaytical design procedure for the installation of simple pendulums on the blades of a helicopter rotor to suppress the root reactions is presented. A frequency response anaysis is conducted of typical rotor blades excited by a harmonic variation of spanwise airload distributions as well as a concentrated load at the tip. The results presented included the effect of pendulum tuning on the minimization of the hub reactions. It is found that a properly designed flapping pendulum attenuates the root out-of-plane force and moment whereas the optimum designed lead-lag pendulum attenuates the root in-plane reactions. For optimum pendulum tuning the parameters to be determined are the pendulum uncoupled natural frequency, the pendulum spanwise location and its mass. It is found that the optimum pendulum frequency is in the vicinity of the excitation frequency. For the optimum pendulum a parametric study is conducted. The parameters varied include prepitch, pretwist, precone and pendulum hinge offset.

  7. Design of a collective scattering system for small scale turbulence study in Korea Superconducting Tokamak Advanced Research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, W., E-mail: woochanglee@unist.ac.kr; Lee, D. J.; Park, H. K.

    The design characteristics of a multi-channel collective (or coherent) scattering system for small scale turbulence study in Korea Superconducting Tokamak Advanced Research (KSTAR), which is planned to be installed in 2017, are given in this paper. A few critical issues are discussed in depth such as the Faraday and Cotton-Mouton effects on the beam polarization, radial spatial resolution, probe beam frequency, polarization, and power. A proper and feasible optics with the 300 GHz probe beam, which was designed based on these issues, provides a simultaneous measurement of electron density fluctuations at four discrete poloidal wavenumbers up to 24 cm{sup −1}.more » The upper limit corresponds to the normalized wavenumber k{sub θ}ρ{sub e} of ∼0.15 in nominal KSTAR plasmas. To detect the scattered beam power and extract phase information, a quadrature detection system consisting of four-channel antenna/detector array and electronics will be employed.« less

  8. Design and evaluation of the ReKon : an integrated detection and assessment perimeter system.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dabling, Jeffrey Glenn; Andersen, Jason Jann; McLaughlin, James O.

    2013-02-01

    Kontek Industries (Kannapolis, NC) and their subsidiary, Stonewater Control Systems (Kannapolis, NC), have entered into a cooperative research and development agreement with Sandia to jointly develop and evaluate an integrated perimeter security system solution, one that couples access delay with detection and assessment. This novel perimeter solution was designed to be configurable for use at facilities ranging from high-security military sites to commercial power plants, to petro/chemical facilities of various kinds. A prototype section of the perimeter has been produced and installed at the Sandia Test and Evaluation Center in Albuquerque, NM. This prototype system integrated fiber optic break sensors,more » active infrared sensors, fence disturbance sensors, video motion detection, and ground sensors. This report documents the design, testing, and performance evaluation of the developed ReKon system. The ability of the system to properly detect pedestrian or vehicle attempts to bypass, breach, or otherwise defeat the system is characterized, as well as the Nuisance Alarm Rate.« less

  9. Feasibility of BNCT radiobiological experiments at the HYTHOR facility

    NASA Astrophysics Data System (ADS)

    Esposito, J.; Ceballos, C.; Soncin, M.; Fabris, C.; Friso, E.; Moro, D.; Colautti, P.; Jori, G.; Rosi, G.; Nava, E.

    2008-06-01

    HYTHOR (HYbrid Thermal spectrum sHifter tapirO Reactor) is a new thermal-neutron irradiation facility, which was installed and became operative in mid 2005 at the TAPIRO (TAratura PIla Rapida potenza 0) fast reactor, in the Casaccia research centre (near Rome) of ENEA (Ente per le Nuove tecnologie Energia ed Ambiente). The facility has been designed for in vivo radiobiological studies. In HYTHOR irradiation cavity, 1-6 mice can be simultaneously irradiated to study skin melanoma treatments with the BNCT (boron neutron capture therapy). The therapeutic effects of HYTHOR radiation field on mouse melanoma has been studied as a preliminary investigation before studying the tumour local control due to boron neutron capture effect after boronated molecule injection. The method to properly irradiate small animals has been precisely defined. Results show that HYTHOR radiation field is by itself effective in reducing the tumour-growth rate. This finding has to be taken into account in studying the effectiveness of new 10B carriers. A method to properly measure the reduction of the tumour-growth rate is reported and discussed.

  10. Successful multi-technology NO{sub x} reduction project experience at New England Power Company - Salem Harbor station

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fynan, G.A.; Sload, A.; Adamson, E.J.

    This paper presents the successes and lessons learned during recent low NOx burner and SNCR projects on generating units at New England Power`s Salem Harbor Generating Station. The principals involved in the project were New England Power Company, New England Power Service Company, Stone and Webster Engineering Corp. and Deutsche-Babcock Riley Inc. One unit was retrofitted with 16 Riley CCV burners with an OFA system, the other with 12 low NOx burners only. In addition to the burners, a SNCR system was also installed on three units. Since each of the burner systems are interdependent (SNCR was treated separately duringmore » design phases and optimized along with the burner systems), close cooperation during the design stages was essential to ensuring a successful installation, startup and optimization. This paper will present the coordinated effort put forth by each company toward this goal with the hope of assisting others who may be planning a similar effort. A summary of the operating results will also be presented. The up front teamwork and advance planning that went into the design stages of the project resulted in a number of successful outcomes e.g. scanner reliability, properly operating oil supply system, compatibility of burners and burner front oil system with new Burner Management System (BMS), reliable first attempt burner ignition and more. Advance planning facilitated pre-outage work and factored into keeping schedules and budgets on track.« less

  11. Indexing device ensures proper mating of electrical connectors

    NASA Technical Reports Server (NTRS)

    Jenkins, L. M.; Simmons, W. H.

    1965-01-01

    Indexing splines with modified standard male and female connectors eliminates the possibility of incorrect mating. Large stock quantities of differently indexed connectors are unnecessary since connectors from a single stock can be indexed as desired at installation time.

  12. 32 CFR 636.21 - Obedience to official traffic control devices.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Obedience to official traffic control devices... INSTALLATIONS) Fort Stewart, Georgia § 636.21 Obedience to official traffic control devices. (a) All drivers... placed by proper authority. ...

  13. 32 CFR 636.21 - Obedience to official traffic control devices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Obedience to official traffic control devices... INSTALLATIONS) Fort Stewart, Georgia § 636.21 Obedience to official traffic control devices. (a) All drivers... placed by proper authority. ...

  14. 32 CFR 636.21 - Obedience to official traffic control devices.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Obedience to official traffic control devices... INSTALLATIONS) Fort Stewart, Georgia § 636.21 Obedience to official traffic control devices. (a) All drivers... placed by proper authority. ...

  15. 32 CFR 636.21 - Obedience to official traffic control devices.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Obedience to official traffic control devices... INSTALLATIONS) Fort Stewart, Georgia § 636.21 Obedience to official traffic control devices. (a) All drivers... placed by proper authority. ...

  16. 32 CFR 636.21 - Obedience to official traffic control devices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Obedience to official traffic control devices... INSTALLATIONS) Fort Stewart, Georgia § 636.21 Obedience to official traffic control devices. (a) All drivers... placed by proper authority. ...

  17. Operation of inspection stations for child restraint use

    DOT National Transportation Integrated Search

    2003-01-01

    Inspection stations are locations where parents and caregivers can go to receive one-on-one tutorial instruction on the proper use and installation of child restraints. The objective of this project was to identify and describe the characteristics of...

  18. 26 CFR 1.453-6 - Deferred payment sale of real property not on installment method.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... therewith and an amount representing what would have been a proper adjustment for exhaustion, wear and tear... adjustment for exhaustion, wear and tear, obsolescence, amortization, and depletion of the property during...

  19. 30 CFR 75.1106-4 - Use of liquefied and nonliquefied compressed gas cylinders; general requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-UNDERGROUND COAL MINES Fire Protection § 75.1106-4 Use of liquefied and nonliquefied compressed gas cylinders... properly installed and operated in accordance with specifications for safety prescribed by the manufacturer...

  20. 30 CFR 75.1106-4 - Use of liquefied and nonliquefied compressed gas cylinders; general requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-UNDERGROUND COAL MINES Fire Protection § 75.1106-4 Use of liquefied and nonliquefied compressed gas cylinders... properly installed and operated in accordance with specifications for safety prescribed by the manufacturer...

  1. Some folded issues related to over-shielded and unplanned rooms for medical linear accelerators - A case study

    NASA Astrophysics Data System (ADS)

    Muhammad, Wazir; Ullah, Asad; Hussain, Amjad; Ali, Nawab; Alam, Khan; Khan, Gulzar; Matiullah; Maeng, Seongjin; Lee, Sang Hoon

    2015-08-01

    A medical linear accelerator (LINAC) room must be properly shielded to limit the outside radiation exposure to an acceptable safe level defined by individual state and international regulations. However, along with this prime objective, some additional issues are also important. The current case-study was designed to unfold the issues related to over-shielded and unplanned treatment rooms for LINACs. In this connection, an apparently unplanned and over-shielded treatment room of 610 × 610 cm2 in size was compared with a properly designed treatment room of 762 × 762 cm2 in size ( i.e., by following the procedures and recommendations of the IAEA Safety Reports Series No. 47 and NCRP 151). Evaluation of the unplanned room indicated that it was over-shielded and that its size was not suitable for total body irradiation (TBI), although the license for such a treatment facility had been acquired for the installed machine. An overall 14.96% reduction in the total shielding volume ( i.e., concrete) for an optimally planned room as compared to a non-planned room was estimated. Furthermore, the inner room's dimensions were increased by 25%, in order to accommodate TBI patients. These results show that planning and design of the treatment rooms are imperative to avoid extra financial burden to the hospitals and to provide enough space for easy and safe handling of the patients. A spacious room is ideal for storing treatment accessories and facilitates TBI treatment.

  2. CHAIN-project and installation of the flare monitoring telescopes in developing countries

    NASA Astrophysics Data System (ADS)

    Ueno, Satoru; Shibata, Kazunari; Kimura, Goichi; Nakatani, Yoshikazu; Kitai, Reizaburo; Nagata, Shin'ichi

    2007-12-01

    The Flare Monitoring Telescope (FMT) was constructed in 1992 at the Hida Observatory in Japan to investigate the long-term variation of solar activity and explosive events, as a project of the international coordinated observations programme (STEP). The FMT consists of five solar imaging telescopes and one guide telescope. The five telescopes simultaneously observe the full-disk Sun at different wavelengths around H-alpha absorption line or in different modes. Therefore, the FMT can measure the three-dimensional velocity field of moving structures on the full solar disk without the atmospheric seeing effect. The science target of the FMT is to monitor solar flares and erupting filaments continuously all over the solar disk and as many events as possible and to investigate the relationship between such phenomena and space weather. Now we are planning to start a new worldwide project called as ``Continuous H-alpha Imaging Network (CHAIN)-project''. As part of this project, we are examining the possibility of installing telescopes similar to the FMT in developing countries with cooperative help by the United Nations. We have selected Peru as the candidate country where the first oversea FMT will be installed, and are beginning to study the natural environment, the seeing conditions, the proper design of the telescope for Peru and the training and education programme of operating staff, etc.

  3. R AND D 100 EARLYBIRD AWARD ENTRY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dugan, J; Debbie Chapman, D

    2007-01-30

    The Smart Latch{trademark} is an electronically enhanced door lockset device for industrial and consumer applications, which uses existing neural network technology to analyze the sequence, timing, and acoustic signatures associated with lockset functions and provides immediate indication of failure to correctly lock and latch. It essentially ''listens'' to and learns the sequences and acoustic signatures associated with lockset function and latching. When triggered by specific door activity the Smart Latch{trademark} begins analyzing sequences, frequencies and other parameters. With a satisfactory outcome the device provides positive feedback (e.g. visual and/or audible) and returns to a ''sleep'' state awaiting the next activity.more » If any part of the normal door operation, including latching and length of time, are incorrect various alarm signals can be generated. With electronics and 5+ year battery integrated, the device is simple to install and transparent to the user. Because the device uses proven voice recognition algorithms, it could meet or exceed the performance of the human ear in detecting the unique and complex acoustic signature associated with a properly operating and secured door. Unlike existing technologies, such as limit switches, it is not easily spoofed or defeated and has a high level of immunity to interference. The Smart Latch{trademark} technology can be integrated into existing lockset and door hardware designs, including both low price consumer products and high end electronic/cipher locks. The concept and design are based on a simple security industry adage: ''It isn't locked if it isn't latched''. Even the most elaborate and robust security barriers are of little use if the locking and latching mechanisms are not properly functioning and engaged. Smart Latch{trademark} provides automatic verification of the first and most important step in facility security: Close and properly latch doors and barriers. It is a compelling product for households with children, elderly, or high traffic areas such as an office where a properly closed and latched door is essential for security and safety. In an age of ever increasing security concerns and limited human resources, Smart Latch{trademark} can be a significant addition to the $20 billion plus industrial and consumer lockset market. The Smart Latch{trademark} is unique because: (1) as an inexpensive, battery powered, stand-alone device or as integrated into any standard consumer lock set, the device uses neural network technology to analyze the acoustic signatures associated with normal door operation and generates an alert if a door is not latched correctly and within a set amount of time. (2) It is not easily spoofed or defeated. (3) Installation, setup, and use are simple.« less

  4. Preliminary evaluation of septic-system absorption-field architecture types in a profile-limited soil.

    PubMed

    Mathis, Amanda J; Brye, Kristofor R; Dunn, Sam

    2011-01-01

    Managing household wastewater is an issue that affects hundreds of thousands of people in rural communities nationwide, many of whom rely on septic systems as their primary means of household wastewater disposal. Septic system absorption field products with architectures quite different from traditional pipe-and-gravel systems are being installed in many states with variances from initial design specifications. The objective of this study was to evaluate the performance, as measured by the in-product height of stored solution, of four differing absorption-field product architecture types in a profile-limited soil that was loaded at the maximum allowable rate based on soil morphology. Five chamber, two gravel-less pipe, two polystyrene aggregate, and four pipe-and-gravel systems were installed in a profile-limited, Captina silt loam soil (fine-silty, siliceous, active, mesic Typic Fragiudult) and dosed with raw effluent at rates determined by current State of Arkansas regulations via individual peristaltic pumps. Free-solution monitoring ports were installed within each product, where the depth to free solution was measured periodically and used to evaluate product performance. Data collected from January through August 2009 indicated that preliminary system performance was unaffected by product architecture type. All products performed similarly under dry soil conditions. However, differences among individual products were observed during periods of hydrologic stress (i.e., wet soil conditions). Surfacing of effluent was not observed atop any product, indicating that the current loading rate design method is functioning properly. Preliminary results indicate that some alternative absorption-field products perform similarly to the traditional pipe-and-gravel system, thus providing flexibility and options for homeowners. by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America, Inc.

  5. Rotational joint for prosthetic leg

    NASA Technical Reports Server (NTRS)

    Jones, W. C.; Owens, L. J.

    1977-01-01

    Device is installed in standard 30 millimeter tubing used for lower leg prosthetics. Unit allows proper rotation (about 3 degrees) of foot relative to the hip, during normal walking or running. Limited rotational movement with restoring force results in a more natural gait.

  6. Microwave Scanning System Correlations

    DTIC Science & Technology

    2010-08-11

    The follow equipment is needed for each of the individual scanning systems: Handheld Scanner Equipment list 1. Dell Netbook (with the...proper software installed by Evisive) 2. Bluetooth USB port transmitter 3. Handheld Probe 4. USB to mini-USB Converter (links camera to netbook

  7. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  8. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  9. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  10. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  11. Measure Guideline: Heat Pump Water Heaters in New and Existing Homes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shapiro, C.; Puttagunta, S.; Owens, D.

    2012-02-01

    This Building America Measure Guideline is intended for builders, contractors, homeowners, and policy-makers. This document is intended to explore the issues surrounding heat pump water heaters (HPWHs) to ensure that homeowners and contractors have the tools needed to appropriately and efficiently install HPWHs. Heat pump water heaters (HPWHs) promise to significantly reduce energy consumption for domestic hot water (DHW) over standard electric resistance water heaters (ERWHs). While ERWHs perform with energy factors (EFs) around 0.9, new HPWHs boast EFs upwards of 2.0. High energy factors in HPWHs are achieved by combining a vapor compression system, which extracts heat from themore » surrounding air at high efficiencies, with electric resistance element(s), which are better suited to meet large hot water demands. Swapping ERWHs with HPWHs could result in roughly 50% reduction in water heating energy consumption for 35.6% of all U.S. households. This Building America Measure Guideline is intended for builders, contractors, homeowners, and policy-makers. While HPWHs promise to significantly reduce energy use for DHW, proper installation, selection, and maintenance of HPWHs is required to ensure high operating efficiency and reliability. This document is intended to explore the issues surrounding HPWHs to ensure that homeowners and contractors have the tools needed to appropriately and efficiently install HPWHs. Section 1 of this guideline provides a brief description of HPWHs and their operation. Section 2 highlights the cost and energy savings of HPWHs as well as the variables that affect HPWH performance, reliability, and efficiency. Section 3 gives guidelines for proper installation and maintenance of HPWHs, selection criteria for locating HPWHs, and highlights of important differences between ERWH and HPWH installations. Throughout this document, CARB has included results from the evaluation of 14 heat pump water heaters (including three recently released HPWH products) installed in existing homes in the northeast region of the United States.« less

  12. Designing Predictive Diagnose Method for Insulation Resistance Degradation of the Electrical Power Cables from Neutral Insulated Power Networks

    NASA Astrophysics Data System (ADS)

    Dobra, R.; Pasculescu, D.; Risteiu, M.; Buica, G.; Jevremović, V.

    2017-06-01

    This paper describe some possibilities to minimize voltages switching-off risks from the mining power networks, in case of insulated resistance faults by using a predictive diagnose method. The cables from the neutral insulated power networks (underground mining) are designed to provide a flexible electrical connection between portable or mobile equipment and a point of supply, including main feeder cable for continuous miners, pump cable, and power supply cable. An electronic protection for insulated resistance of mining power cables can be made using this predictive strategy. The main role of electronic relays for insulation resistance degradation of the electrical power cables, from neutral insulated power networks, is to provide a permanent measurement of the insulated resistance between phases and ground, in order to switch-off voltage when the resistance value is below a standard value. The automat system of protection is able to signalize the failure and the human operator will be early informed about the switch-off power and will have time to take proper measures to fix the failure. This logic for fast and automat switch-off voltage without aprioristic announcement is suitable for the electrical installations, realizing so a protection against fires and explosion. It is presented an algorithm and an anticipative relay for insulated resistance control from three-phase low voltage installations with insulated neutral connection.

  13. Pollution-free road lighting

    NASA Astrophysics Data System (ADS)

    Schreuder, Duco A.

    They relate to reducing road accidents and some forms of crime but also enhance the social safety of residents and pedestrians and the amenity for residents. Road traffic in developing countries is much more hazardous than in industrialized countries. Accident rates in 'low' income countries may be as much as 35 times higher than in 'high' income countries. Thus, it might be much more cost-effective to light roads in the developing world than in the industrialized world. Fighting light pollution is more pressing in developing countries as most of the major high-class astronomical observatories are there. Astronomical observations are disturbed by light from outdoor lighting installations, part of which is scattered in the atmosphere to form 'sky glow'. The International Lighting Commission CIE has published a Technical Report giving general guidance for lighting designers and policy makers on the reduction of the sky glow. Lighting improves visibility, essential for almost all human activity. However, light that hits the road contributes to visibility only if it is reflected. In poorly designed lighting equipment much of the lumen output of the lamps is sent directly upwards. This can be avoided by properly defined light fittings. The light output of fittings is determined by their optical quality and by the installation maintenance factor. Open fittings are to be preferred. If mounted horizontally, they make street lighting with the least light pollution.

  14. QUALITY ASSURANCE AND QUALITY CONTROL FOR WASTE CONTAINMENT FACILITIES. Project Summary

    EPA Science Inventory

    It is generally agreed that both quality assurance (QA) and quality control (QC) are essential to the proper installation and eventual performance of environmentally safe and secure waste containment systems. Even further, there are both manufacturing and construction aspects to...

  15. Preparation of construction specifications, contract documents, field testing, educational materials, and course offerings for trenchless construction

    DOT National Transportation Integrated Search

    2005-10-01

    Trenchless technology offers methods by which underground utilities may be installed without damage to overlying pavement, if proper precautions are observed. In the past ten years, repeated improvements in technology, materials, and methods have adv...

  16. Characterization of low temperature creep properties of crack sealants using bending beam rehometry.

    DOT National Transportation Integrated Search

    2009-11-01

    Crack sealing has been widely used as a routine preventative maintenance practice. Given its proper installation, crack sealants can extend : pavement service life by three to five years. However, current specifications for the selection of crack sea...

  17. Characterization of low temperature mechanical properties of crack sealants utilizing direct tension test.

    DOT National Transportation Integrated Search

    2008-11-01

    Crack sealing has been widely used as a routine preventative maintenance practice. Given its proper : installation, crack sealants can extend pavement service life by three to five years. However, current : specifications for the selection of crack s...

  18. 49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...

  19. 49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...

  20. 49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...

  1. 49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...

  2. 49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...

  3. Seat belts and shoulder harnesses : smart protection in small airplanes.

    DOT National Transportation Integrated Search

    2004-05-01

    Seat belts alone will protect you only in minor impacts. : Using shoulder belts in small aircraft would reduce major injuries by 88% and fatalities by 20%. Shoulder belt kits are now available for most airplanes. : Proper use and installation of chil...

  4. Design and installation package for a solar powered pump

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.

  5. Comparison of Cryogenic Temperature Sensor Installation Inside or Outside the Piping

    NASA Astrophysics Data System (ADS)

    Müller, R.; Süßer, M.

    2010-04-01

    Cryogenic thermometers for large cryogenic facilities, like superconducting particle accelerator or fusion devices, must be able to withstand very severe conditions over the lifetime of the facility. In addition to the proper selection of the sensor, the choice of the appropriate installation method plays an important role for satisfying operation. Several characteristics must be taken into account, for instance: large numbers of sensors, different claims of accuracy, qualified preparation methods and at least qualified attachment of the sensor holder on the piping. One remedy to get satisfying results is the development of simple thermometer mounting fixtures, because thermometer mounting often may be realized by personnel with limited experience. This contribution presents two different methods for sensor installations, namely inside or outside installation on the piping. These have been the standard applications in the superconducting coil test facility TOSKA for many years. The characteristics of each of these methods will be discussed and compared.

  6. Integrated Field Testing of Fuel Cells and Micro-Turbines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jerome R. Temchin; Stephen J. Steffel

    A technical and economic evaluation of the prospects for the deployment of distributed generation on Long Beach Island, New Jersey concluded that properly sited DG would defer upgrading of the electric power grid for 10 years. This included the deployment of fuel cells or microturbines as well as reciprocating engines. The implementation phase of this project focused on the installation of a 120 kW CHP microturbine system at the Harvey Cedars Bible Conference in Harvey Cedars, NJ. A 1.1 MW generator powered by a gas-fired reciprocating engine for additional grid support was also installed at a local substation. This reportmore » contains installation and operation issues as well as the utility perspective on DG deployment.« less

  7. 14 CFR 23.991 - Fuel pumps.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System Components... installations, each fuel pump required for proper engine operation, or required to meet the fuel system... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel pumps. 23.991 Section 23.991...

  8. 14 CFR 23.991 - Fuel pumps.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System Components... installations, each fuel pump required for proper engine operation, or required to meet the fuel system... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fuel pumps. 23.991 Section 23.991...

  9. 14 CFR 23.991 - Fuel pumps.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System Components... installations, each fuel pump required for proper engine operation, or required to meet the fuel system... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Fuel pumps. 23.991 Section 23.991...

  10. 14 CFR 23.991 - Fuel pumps.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System Components... installations, each fuel pump required for proper engine operation, or required to meet the fuel system... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Fuel pumps. 23.991 Section 23.991...

  11. 14 CFR 23.991 - Fuel pumps.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System Components... installations, each fuel pump required for proper engine operation, or required to meet the fuel system... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Fuel pumps. 23.991 Section 23.991...

  12. 24 CFR 3285.601 - Field assembly.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Field assembly. 3285.601 Section... § 3285.601 Field assembly. Home manufacturers must provide specific installation instructions for the proper field assembly of manufacturer-supplied and shipped loose ducts, plumbing, and fuel supply system...

  13. 24 CFR 3285.601 - Field assembly.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Field assembly. 3285.601 Section... § 3285.601 Field assembly. Home manufacturers must provide specific installation instructions for the proper field assembly of manufacturer-supplied and shipped loose ducts, plumbing, and fuel supply system...

  14. 24 CFR 3285.601 - Field assembly.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Field assembly. 3285.601 Section... § 3285.601 Field assembly. Home manufacturers must provide specific installation instructions for the proper field assembly of manufacturer-supplied and shipped loose ducts, plumbing, and fuel supply system...

  15. 24 CFR 3285.601 - Field assembly.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Field assembly. 3285.601 Section... § 3285.601 Field assembly. Home manufacturers must provide specific installation instructions for the proper field assembly of manufacturer-supplied and shipped loose ducts, plumbing, and fuel supply system...

  16. Rain garden guidelines for southwest Ohio

    EPA Science Inventory

    Rain gardens are a unique and practical landscape feature that can enhance the beauty of home gardens. When properly installed, they are one method of limiting the negative effects of rainfall runoff in urban areas. Indeed, rain gardens turn a "negative" into a "positive" by capt...

  17. Superelastic Ball Bearings: Materials and Design to Avoid Mounting and Dismounting Brinell Damage in an Inaccessible Press-fit Application-. II; Detailed Analysis

    NASA Technical Reports Server (NTRS)

    Howard, S. Adam; Dellacorte, Christopher

    2015-01-01

    Rolling element bearings utilized in precision rotating machines require proper alignment, preload, and interference fits to ensure overall optimum performance. Hence, careful attention must be given to bearing installation and disassembly procedures to ensure the above conditions are met. Usually, machines are designed in such a way that bearings can be pressed into housings or onto shafts through the races without loading the rolling elements. However, in some instances, either due to limited size or access, a bearing must be installed or removed in such a way that the load path travels through the rolling elements. This can cause high contact stresses between the rolling elements and the races and introduces the potential for Brinell denting of the races. This paper is a companion to the Part I paper by the authors that discusses material selection and the general design philosophy for the bearing. Here, a more in-depth treatment is given to the design of a dent-resistant bearing utilizing a superelastic alloy, 60NiTi, for the races. A common bearing analysis tool based on rigid body dynamics is used in combination with finite element simulations to design the superelastic bearing. The primary design constraints are prevention of denting and avoiding the balls riding over the edge of the race groove during a blind disassembly process where the load passes through the rolling elements. Through an iterative process, the resulting bearing geometry is tailored to improve axial static load capability compared to a deep-groove ball bearing of the same size. The results suggest that careful selection of materials and bearing geometry can enable blind disassembly without damage to the raceways, which is necessary in the current application (a compressor in the International Space Station Environmental Control and Life Support System), and results in potential design flexibility for other applications, especially small machines with miniature bearings.

  18. 14 CFR 27.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Storage battery design and installation. 27... Equipment § 27.1353 Storage battery design and installation. (a) Each storage battery must be designed and... result when the battery is recharged (after previous complete discharge)— (1) At maximum regulated...

  19. 14 CFR 27.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Storage battery design and installation. 27... Equipment § 27.1353 Storage battery design and installation. (a) Each storage battery must be designed and... result when the battery is recharged (after previous complete discharge)— (1) At maximum regulated...

  20. 14 CFR 27.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Storage battery design and installation. 27... Equipment § 27.1353 Storage battery design and installation. (a) Each storage battery must be designed and... result when the battery is recharged (after previous complete discharge)— (1) At maximum regulated...

  1. 14 CFR 27.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Storage battery design and installation. 27... Equipment § 27.1353 Storage battery design and installation. (a) Each storage battery must be designed and... result when the battery is recharged (after previous complete discharge)— (1) At maximum regulated...

  2. 14 CFR 27.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Storage battery design and installation. 27... Equipment § 27.1353 Storage battery design and installation. (a) Each storage battery must be designed and... result when the battery is recharged (after previous complete discharge)— (1) At maximum regulated...

  3. The NASA/Baltimore Applications Project (BAP). Computer aided dispatch and communications system for the Baltimore Fire Department: A case study of urban technology application

    NASA Technical Reports Server (NTRS)

    Levine, A. L.

    1981-01-01

    An engineer and a computer expert from Goddard Space Flight Center were assigned to provide technical assistance in the design and installation of a computer assisted system for dispatching and communicating with fire department personnel and equipment in Baltimore City. Primary contributions were in decision making and management processes. The project is analyzed from four perspectives: (1) fire service; (2) technology transfer; (3) public administration; and (5) innovation. The city benefitted substantially from the approach and competence of the NASA personnel. Given the proper conditions, there are distinct advantages in having a nearby Federal laboratory provide assistance to a city on a continuing basis, as is done in the Baltimore Applications Project.

  4. PREVAIL: latest electron optics results

    NASA Astrophysics Data System (ADS)

    Pfeiffer, Hans C.; Golladay, Steven D.; Gordon, Michael S.; Kendall, Rodney A.; Lieberman, Jon E.; Rockrohr, James D.; Stickel, Werner; Yamaguchi, Takeshi; Okamoto, Kazuya; Umemoto, Takaaki; Shimizu, Hiroyasu; Kojima, Shinichi; Hamashima, Muneki

    2002-07-01

    The PREVAIL electron optics subsystem developed by IBM has been installed at Nikon's facility in Kumagaya, Japan, for integration into the Nikon commercial EPL stepper. The cornerstone of the electron optics design is the Curvilinear Variable Axis Lens (CVAL) technique originally demonstrated with a proof of concept system. This paper presents the latest experimental results obtained with the electron optical subsystem at Nikon's facility. The results include micrographs illustrating proper CVAL operation through the spatial resolution achieved over the entire optical field of view. They also include data on the most critical issue of the EPL exposure approach: subfield stitching. The methodology of distortion correction will be described and both micrographs and metrology data of stitched subfields will be presented. This paper represents a progress report of the IBM/Nikon alliance activity on EPL.

  5. Incinerator technology overview

    NASA Astrophysics Data System (ADS)

    Santoleri, Joseph J.

    1993-03-01

    Many of the major chemical companies in the U.S. who regarded a safe environment as their responsibility installed waste treatment and disposal facilities on their plant sites in the last two decades. Many of these plants elected to use incinerators as the treatment process. This was not always the most economical method, but in many cases it was the only method of disposal that provided a safe and sure method of maximum destruction. Environmental concern over contamination from uncontrolled land disposal sites, and the emergence of tougher regulations for land disposal provide incentives for industry to employ a wide variety of traditional and advanced technologies for managing hazardous wastes. Incineration systems utilizing proper design, operation, and maintenance provides the safest, and in the long run, the most economical avenue to the maximum level of destruction of organic hazardous wastes.

  6. Shadowing effects on multi-step Langmuir probe array on HL-2A tokamak

    NASA Astrophysics Data System (ADS)

    Ke, R.; Xu, M.; Nie, L.; Gao, Z.; Wu, Y.; Yuan, B.; Chen, J.; Song, X.; Yan, L.; Duan, X.

    2018-05-01

    Multi-step Langmuir probe arrays have been designed and installed on the HL-2A tokamak [1]–[2] to study the turbulent transport in the edge plasma, especially for the measurement of poloidal momentum flux, Reynolds stress Rs. However, except the probe tips on the top step, all other tips on lower steps are shadowed by graphite skeleton. It is necessary to estimate the shadowing effects on equilibrium and fluctuation measurement. In this paper, comparison of shadowed tips to unshadowed ones is presented. The results show that shadowing can strongly reduce the ion and electron effective collection area. However, its effect is negligible for the turbulence intensity and coherence measurement, confirming that the multi-step LP array is proper for the turbulent transport measurement.

  7. FAST ACTING CURRENT SWITCH

    DOEpatents

    Batzer, T.H.; Cummings, D.B.; Ryan, J.F.

    1962-05-22

    A high-current, fast-acting switch is designed for utilization as a crowbar switch in a high-current circuit such as used to generate the magnetic confinement field of a plasma-confining and heat device, e.g., Pyrotron. The device particularly comprises a cylindrical housing containing two stationary, cylindrical contacts between which a movable contact is bridged to close the switch. The movable contact is actuated by a differential-pressure, airdriven piston assembly also within the housing. To absorb the acceleration (and the shock imparted to the device by the rapidly driven, movable contact), an adjustable air buffer assembly is provided, integrally connected to the movable contact and piston assembly. Various safety locks and circuit-synchronizing means are also provided to permit proper cooperation of the invention and the high-current circuit in which it is installed. (AEC)

  8. Integrated residential photovoltaic array development

    NASA Technical Reports Server (NTRS)

    Shepard, N. F., Jr.

    1981-01-01

    Three basic module design concepts were analyzed with respect to both production and installation costs. The results of this evaluation were used to synthesize a fourth design which incorporates the best features of these initial concepts to produce a module/array design approach which offers the promise of a substantial reduction in the installed cost of a residential array. A unique waterproofing and mounting scheme was used to reduce the cost of installing an integral array while still maintaining a high probability that the installed array will be watertight for the design lifetime of the system. This recommended concept will also permit the array to be mounted as a direct or stand-off installation with no changes to the module design.

  9. UKIRT Upgrades Program: design and installation of the Dome Ventilation System (DVS)

    NASA Astrophysics Data System (ADS)

    Neff, D. H.; Hileman, Edward A.; Kain, S. J.; Cavedoni, Charles P.; Chuter, Timothy C.

    1997-03-01

    In order to encourage adequate dome ventilation to reduce or eliminate dome seeing at the 3.8 m United Kingdom Infrared Telescope (UKIRT), a dome ventilation system (DVS) was designed to be installed in the lower dome skirt. The modifications to the dome for the new DVS apertures consisted of installing a reinforcing frame containing an insulated rollup door and adjustable louvers. This paper describes the finite element structural analysis of the reinforcing frame, the detailed design of the frame hardware, the design of the programmable language control (PLC) system for controlling the opening and closing of the rollup doors, and the fabrication and installation of a prototype frame assembly. To date, a prototype assembly has been installed that confirms the design, and fifteen production assemblies are currently under fabrication for installation by September 1996.

  10. 32 CFR 770.3 - Fishing regulations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 5 2012-07-01 2012-07-01 false Fishing regulations. 770.3 Section 770.3... LIMITING PUBLIC ACCESS TO PARTICULAR INSTALLATIONS Hunting and Fishing at Marine Corps Base, Quantico, Virginia § 770.3 Fishing regulations. (a) All persons possessing the proper state license and Base permit...

  11. 32 CFR 770.3 - Fishing regulations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 5 2014-07-01 2014-07-01 false Fishing regulations. 770.3 Section 770.3... LIMITING PUBLIC ACCESS TO PARTICULAR INSTALLATIONS Hunting and Fishing at Marine Corps Base, Quantico, Virginia § 770.3 Fishing regulations. (a) All persons possessing the proper state license and Base permit...

  12. 32 CFR 770.3 - Fishing regulations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 5 2013-07-01 2013-07-01 false Fishing regulations. 770.3 Section 770.3... LIMITING PUBLIC ACCESS TO PARTICULAR INSTALLATIONS Hunting and Fishing at Marine Corps Base, Quantico, Virginia § 770.3 Fishing regulations. (a) All persons possessing the proper state license and Base permit...

  13. Energy Control Systems: Energy Savings.

    ERIC Educational Resources Information Center

    School Business Affairs, 1980

    1980-01-01

    The installation of proper control systems is estimated as saving up to 25 percent of the energy used in schools. Other potential energy-saving areas are transmission (heat loss or gain through walls, especially ceilings); internal load (heat from students, lights, and machinery); ventilation; and equipment maintenance. (Author/MLF)

  14. 49 CFR 178.960 - Preparation of Large Packagings for testing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., including inner packagings. All closures must be installed using proper techniques and torques. (b) For the...). Average values should fall within these limits. Short-term fluctuations and measurement limitations may cause individual measurements to vary by up to ± 5 percent relative humidity without significant...

  15. 49 CFR 178.960 - Preparation of Large Packagings for testing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., including inner packagings. All closures must be installed using proper techniques and torques. (b) For the...). Average values should fall within these limits. Short-term fluctuations and measurement limitations may cause individual measurements to vary by up to ± 5 percent relative humidity without significant...

  16. 49 CFR 178.960 - Preparation of Large Packagings for testing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., including inner packagings. All closures must be installed using proper techniques and torques. (b) For the...). Average values should fall within these limits. Short-term fluctuations and measurement limitations may cause individual measurements to vary by up to ±5 percent relative humidity without significant...

  17. 49 CFR 178.960 - Preparation of Large Packagings for testing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., including inner packagings. All closures must be installed using proper techniques and torques. (b) For the...). Average values should fall within these limits. Short-term fluctuations and measurement limitations may cause individual measurements to vary by up to ±5 percent relative humidity without significant...

  18. 49 CFR 178.960 - Preparation of Large Packagings for testing.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., including inner packagings. All closures must be installed using proper techniques and torques. (b) For the...). Average values should fall within these limits. Short-term fluctuations and measurement limitations may cause individual measurements to vary by up to ±5 percent relative humidity without significant...

  19. Quantifying Construction Site Sediment Discharge Risk and Treatment Potential

    NASA Astrophysics Data System (ADS)

    Ferrell, L.; Beighley, R. E.

    2006-12-01

    Dealing with soil erosion and sediment transport can be a significant challenge during the construction process due to the potentially large spatial and temporal extent and conditions of bare soils. Best Management Practices (BMP) are commonly used to eliminate or reduce offsite discharge of sediment. However, few efforts have investigated the time varying risk of sediment discharge from construction sites, which often have dynamic soil conditions and the potential for less than optimal BMP installations. The goal of this research is to improve the design, implementation and effectiveness of sediment and erosion control at construction sites using site specific, temporal distributions of sediment discharge risk. Sediment risk is determined from individual factors leading to sediment expert, such as rainfall frequency, the adequacy of BMP installations, and the extent and duration of bare soil conditions. This research specifically focuses on quantifying: (a) the effectiveness of temporary sediment and control erosion control BMPs in preventing, containing, and/or treating construction site sediment discharge at varying levels of "proper" installation, and (b) sediment discharge potential from construction sites during different phases of construction, (ex., disturbed earth operations). BMPs are evaluated at selected construction sites in southern California and at the Soil Erosion Research Laboratory (SERL) in the Civil and Environmental Engineering department at San Diego State University. SERL experiments are performed on a 3-m by 10-m tilting soil bed with soil depths up to 1 meter, slopes ranging from 0 to 50 percent, and rainfall rates up to 150 mm/hr (6 in/hr). BMP performance is assessed based on experiments where BMPs are installed per manufacture specifications, potential less than optimal installations, and no treatment conditions. Soil conditions are also varied to represent site conditions during different phases of construction (i.e., loose lifts, stock piles, temporary roads, finished grade, others). Preliminary site monitoring, experimental results, and a conceptual model for estimating the time depend risk of sediment discharge over the duration of a construction project are presented.

  20. Analysis of mixing conditions and multistage irradiation impact on NOx removal efficiency in the electron beam flue gas treatment process.

    PubMed

    Pawelec, Andrzej; Dobrowolski, Andrzej

    2017-01-01

    In the process of electron beam flue gas treatment (EBFGT), most energy is spent on NO x removal. The dose distribution in the reactor is not uniform and the flue gas flow pattern plays an important role in the process efficiency. It was found that proper construction of the reactor may increase the energy efficiency of the process. The impact of the number of irradiation stages and mixing conditions on NO x removal efficiency was investigated for an ideal case and a practical solution was presented and compared with previously known EBFGT reactor constructions. The research was performed by means of computational fluid dynamics methods in combination with empirical Wittig formula. Two versions of dose distribution were taken for calculations. The results of the research show that for an ideal case, application of multistage irradiation and interstage mixing may reduce the energy consumption in the process by up to 39%. On the other side, simulation of reactor construction modification for two-stage irradiation results in 25% energy consumption reduction. The results of presented case study may be applied for improving the existing reactors and proper design of future installations.

  1. Offering integrated medical equipment management in an application service provider model.

    PubMed

    Cruz, Antonio Miguel; Barr, Cameron; Denis, Ernesto Rodríguez

    2007-01-01

    With the advancement of medical technology and thus the complexity of the equipment under their care, clinical engineering departments (CEDs) must continue to make use of computerized tools in the management of departmental activities. Authors of this paper designed, installed, and implemented an application service provider (ASP) model at the laboratory level to offer value added management tools in an online format to CEDs. The project, designed to investigate how to help meet demands across multiple healthcare organizations and provide a means of access for organizations that otherwise might not be able to take advantage of the benefits of those tools, has been well received. Ten hospitals have requested the service, and five of those are ready to proceed with the implementation of the ASP. With the proposed centralized system architecture, the model has shown promise in reducing network infrastructure labor and equipment costs, benchmarking of equipment performance indicators, and developing avenues for proper and timely problem reporting. The following is a detailed description of the design process from conception to implementation of the five main software modules and supporting system architecture.

  2. The optimization of design parameters for surge relief valve for pipeline systems

    NASA Astrophysics Data System (ADS)

    Kim, Hyunjun; Hur, Jisung; Kim, Sanghyun

    2017-06-01

    Surge is an abnormal pressure which induced by rapid changes of flow rate in pipeline systems. In order to protect pipeline system from the surge pressure, various hydraulic devices have been developed. Surge-relief valve(SRV) is one of the widely applied devices to control surge due to its feasibility in application, efficiency and cost-effectiveness. SRV is designed to automatically open under abnormal pressure and discharge the flow and makes pressure of the system drop to the allowable level. The performance of the SRV is influenced by hydraulics. According to previous studies, there are several affecting factors which determine performance of the PRV such as design parameters (e.g. size of the valve), system parameters (e.g. number of the valves and location of the valve), and operation parameters (e.g. set point and operation time). Therefore, the systematic consideration for factors affecting performance of SRV is required for the proper installation of SRV in the system. In this study, methodology for finding optimum parameters of the SRV is explored through the integration of Genetic Algorithm(GA) into surge analysis.

  3. Design guidelines for avoiding thermo-acoustic oscillations in helium piping systems

    DOE PAGES

    Gupta, Prabhat Kumar; Rabehl, Roger

    2015-04-02

    Thermo-acoustic oscillations are a commonly observed phenomenon in helium cryogenic systems, especially in tubes connecting hot and cold areas. The open ends of these tubes are connected to the lower temperature (typically at 4.5 K), and the closed ends of these tubes are connected to the high temperature (300 K). Cryogenic instrumentation installations provide ideal conditions for these oscillations to occur due to the steep temperature gradient along the tubing. These oscillations create errors in measurements as well as an undesirable heat load to the system. The work presented here develops engineering guidelines to design oscillation-free helium piping. This workmore » also studies the effect of different piping inserts and shows how the proper geometrical combinations have to be chosen to avoid thermo-acoustic oscillations. The effect of an 80 K intercept is also studied and shows that thermo-oscillations can be dampened by placing the intercept at an appropriate location. As a result, the design of helium piping based on the present work is also verified with the experimental results available in open literature.« less

  4. Acoustic Characterization of Compact Jet Engine Simulator Units

    NASA Technical Reports Server (NTRS)

    Doty, Michael J.; Haskin, Henry H.

    2013-01-01

    Two dual-stream, heated jet, Compact Jet Engine Simulator (CJES) units are designed for wind tunnel acoustic experiments involving a Hybrid Wing Body (HWB) vehicle. The newly fabricated CJES units are characterized with a series of acoustic and flowfield investigations to ensure successful operation with minimal rig noise. To limit simulator size, consistent with a 5.8% HWB model, the CJES units adapt Ultra Compact Combustor (UCC) technology developed at the Air Force Research Laboratory. Stable and controllable operation of the combustor is demonstrated using passive swirl air injection and backpressuring of the combustion chamber. Combustion instability tones are eliminated using nonuniform flow conditioners in conjunction with upstream screens. Through proper flow conditioning, rig noise is reduced by more than 20 dB over a broad spectral range, but it is not completely eliminated at high frequencies. The low-noise chevron nozzle concept designed for the HWB test shows expected acoustic benefits when installed on the CJES unit, and consistency between CJES units is shown to be within 0.5 dB OASPL.

  5. [The endoscopic operating room OR 1].

    PubMed

    Dubuisson, J B; Chapron, C

    2003-04-01

    During the last few years, the development of surgical laparoscopy has been the major turning point, and the most important progress in the field of surgery. The specific installation requirements of surgical laparoscopy, as well as the technological progress proper to this surgical technique, justify the need of a new organization of the operating theatre. The new operating room OR 1 is especially designed to fit and satisfy the requirements of a modern operating theatre, where surgical laparoscopy plays a major role. The organization and the design of this new operating room (OR 1) rely on 2 main concepts: architectural, and computerized, through 2 PC systems SCB and AIDA. The main objectives of this new concept are: allowing the surgeon to control and command all the functions and the instruments, as well as the lighting of the room and the operating field; managing the surgical data and images required for medical files; establishing a communication network either from the inside or outside the sterile zone.

  6. Evolution of a modular software network

    PubMed Central

    Fortuna, Miguel A.; Bonachela, Juan A.; Levin, Simon A.

    2011-01-01

    “Evolution behaves like a tinkerer” (François Jacob, Science, 1977). Software systems provide a singular opportunity to understand biological processes using concepts from network theory. The Debian GNU/Linux operating system allows us to explore the evolution of a complex network in a unique way. The modular design detected during its growth is based on the reuse of existing code in order to minimize costs during programming. The increase of modularity experienced by the system over time has not counterbalanced the increase in incompatibilities between software packages within modules. This negative effect is far from being a failure of design. A random process of package installation shows that the higher the modularity, the larger the fraction of packages working properly in a local computer. The decrease in the relative number of conflicts between packages from different modules avoids a failure in the functionality of one package spreading throughout the entire system. Some potential analogies with the evolutionary and ecological processes determining the structure of ecological networks of interacting species are discussed. PMID:22106260

  7. Interface of the transport systems research vehicle monochrome display system to the digital autonomous terminal access communication data bus

    NASA Technical Reports Server (NTRS)

    Easley, W. C.; Tanguy, J. S.

    1986-01-01

    An upgrade of the transport systems research vehicle (TSRV) experimental flight system retained the original monochrome display system. The original host computer was replaced with a Norden 11/70, a new digital autonomous terminal access communication (DATAC) data bus was installed for data transfer between display system and host, while a new data interface method was required. The new display data interface uses four split phase bipolar (SPBP) serial busses. The DATAC bus uses a shared interface ram (SIR) for intermediate storage of its data transfer. A display interface unit (DIU) was designed and configured to read from and write to the SIR to properly convert the data from parallel to SPBP serial and vice versa. It is found that separation of data for use by each SPBP bus and synchronization of data tranfer throughout the entire experimental flight system are major problems which require solution in DIU design. The techniques used to accomplish these new data interface requirements are described.

  8. 10 CFR 71.87 - Routine determinations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Routine determinations. 71.87 Section 71.87 Energy NUCLEAR...; (c) Each closure device of the packaging, including any required gasket, is properly installed and secured and free of defects; (d) Any system for containing liquid is adequately sealed and has adequate...

  9. 10 CFR 71.87 - Routine determinations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Routine determinations. 71.87 Section 71.87 Energy NUCLEAR...; (c) Each closure device of the packaging, including any required gasket, is properly installed and secured and free of defects; (d) Any system for containing liquid is adequately sealed and has adequate...

  10. 10 CFR 71.87 - Routine determinations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Routine determinations. 71.87 Section 71.87 Energy NUCLEAR...; (c) Each closure device of the packaging, including any required gasket, is properly installed and secured and free of defects; (d) Any system for containing liquid is adequately sealed and has adequate...

  11. 10 CFR 71.87 - Routine determinations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Routine determinations. 71.87 Section 71.87 Energy NUCLEAR...; (c) Each closure device of the packaging, including any required gasket, is properly installed and secured and free of defects; (d) Any system for containing liquid is adequately sealed and has adequate...

  12. 10 CFR 71.87 - Routine determinations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Routine determinations. 71.87 Section 71.87 Energy NUCLEAR...; (c) Each closure device of the packaging, including any required gasket, is properly installed and secured and free of defects; (d) Any system for containing liquid is adequately sealed and has adequate...

  13. Day in, Day out

    ERIC Educational Resources Information Center

    Frazier, Mary Claire

    2006-01-01

    Some persuasive research over the past decade shows a strong relationship between the availability of daylight in classrooms and increased test scores for students. Schools seeking to apply that research to actual school construction projects face several hurdles, but the benefits can be real and long-lasting. A properly installed, calibrated and…

  14. Acrilan Contract Carpet Specification Guide.

    ERIC Educational Resources Information Center

    Monsanto Textiles Co., Atlanta, GA.

    The purpose of this guide is to assist specifiers in properly specifying carpet made of Monsanto Acrilan acrylic fiber. As carpet is used in an expanding range of applications, it must meet increasing and varying regulatory requirements. Performance needs vary with the type of environment in which the carpet is installed. Carpet construction must…

  15. 49 CFR 234.253 - Flashing light units and lamp voltage.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Flashing light units and lamp voltage. 234.253... Maintenance, Inspection, and Testing Inspections and Tests § 234.253 Flashing light units and lamp voltage. (a... proper alignment and frequency of flashes in accordance with installation specifications. (b) Lamp...

  16. 49 CFR 234.253 - Flashing light units and lamp voltage.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Flashing light units and lamp voltage. 234.253... Maintenance, Inspection, and Testing Inspections and Tests § 234.253 Flashing light units and lamp voltage. (a... proper alignment and frequency of flashes in accordance with installation specifications. (b) Lamp...

  17. 33 CFR 164.46 - Automatic Identification System (AIS).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (AIS). 164.46 Section 164.46 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... Identification System (AIS). (a) The following vessels must have a properly installed, operational, type approved AIS as of the date specified: (1) Self-propelled vessels of 65 feet or more in length, other than...

  18. 33 CFR 164.46 - Automatic Identification System (AIS).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (AIS). 164.46 Section 164.46 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... Identification System (AIS). (a) The following vessels must have a properly installed, operational, type approved AIS as of the date specified: (1) Self-propelled vessels of 65 feet or more in length, other than...

  19. 33 CFR 164.46 - Automatic Identification System (AIS).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (AIS). 164.46 Section 164.46 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... Identification System (AIS). (a) The following vessels must have a properly installed, operational, type approved AIS as of the date specified: (1) Self-propelled vessels of 65 feet or more in length, other than...

  20. 33 CFR 164.46 - Automatic Identification System (AIS).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (AIS). 164.46 Section 164.46 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... Identification System (AIS). (a) The following vessels must have a properly installed, operational, type approved AIS as of the date specified: (1) Self-propelled vessels of 65 feet or more in length, other than...

  1. 33 CFR 164.46 - Automatic Identification System (AIS).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (AIS). 164.46 Section 164.46 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... Identification System (AIS). (a) The following vessels must have a properly installed, operational, type approved AIS as of the date specified: (1) Self-propelled vessels of 65 feet or more in length, other than...

  2. 40 CFR 142.307 - What terms and conditions must be included in a small system variance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that may affect proper and effective operation and maintenance of the technology; (2) Monitoring... effective installation, operation and maintenance of the applicable small system variance technology in... health, which may include: (i) Public education requirements; and (ii) Source water protection...

  3. 24 CFR 3285.605 - Fuel supply system.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Fuel supply system. 3285.605... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Ductwork and Plumbing and Fuel Supply Systems § 3285.605 Fuel supply system. (a) Proper supply pressure. The gas piping system in the home is...

  4. 10 CFR 35.642 - Periodic spot-checks for teletherapy units.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... coincidence of the radiation field and the field indicated by the light beam localizing device; (4) The... to assure proper operation of— (1) Electrical interlocks at each teletherapy room entrance; (2) Electrical or mechanical stops installed for the purpose of limiting use of the primary beam of radiation...

  5. Effectiveness of a decentralized stormwater management program in the reduction of runoff volume

    EPA Science Inventory

    A decentralized, retrofit approach to storm water management was implemented in a small suburban drainage on the basis of a voluntary reverse auction. This effort led to the installation of 83 rain gardens and 176 rain barrels on approximately 20 percent of 350 residential proper...

  6. Evaluation of Cable Harness Post-Installation Testing. Part B

    NASA Technical Reports Server (NTRS)

    King, M. S.; Iannello, C. J.

    2011-01-01

    The Cable Harness Post-Installation Testing Report was written in response to an action issued by the Ares Project Control Board (PCB). The action for the Ares I Avionics & Software Chief Engineer and the Avionics Integration and Vehicle Systems Test Work Breakdown Structure (WBS) Manager in the Vehicle Integration Office was to develop a set of guidelines for electrical cable harnesses. Research showed that post-installation tests have been done since the Apollo era. For Ares I-X, the requirement for post-installation testing was removed to make it consistent with the avionics processes used on the Atlas V expendable launch vehicle. Further research for the report involved surveying government and private sector launch vehicle developers, military and commercial aircraft, spacecraft developers, and harness vendors. Responses indicated crewed launch vehicles and military aircraft perform post-installation tests. Key findings in the report were as follows: Test requirements identify damage, human-rated vehicles should be tested despite the identification of statistically few failures, data does not support the claim that post-installation testing damages the harness insulation system, and proper planning can reduce overhead associated with testing. The primary recommendation of the report is for the Ares projects to retain the practice of post-fabrication and post-installation cable harness testing.

  7. Effect of Doppler flow meter position on discharge measurement in surcharged manholes.

    PubMed

    Yang, Haoming; Zhu, David Z; Liu, Yanchen

    2018-02-01

    Determining the proper installation location of flow meters is important for accurate measurement of discharge in sewer systems. In this study, flow field and flow regimes in two types of manholes under surcharged flow were investigated using a commercial computational fluid dynamics (CFD) code. The error in measuring the flow discharge using a Doppler flow meter (based on the velocity in a Doppler beam) was then estimated. The values of the corrective coefficient were obtained for the Doppler flow meter at different locations under various conditions. Suggestions for selecting installation positions are provided.

  8. Next Generation Loading System for Detonators and Primers

    DTIC Science & Technology

    Designed , fabricated and installed next generation tooling to provide additional manufacturing capabilities for new detonators and other small...prototype munitions on automated, semi-automated and manual machines. Lead design effort, procured and installed a primary explosive Drying Oven for a pilot...facility. Designed , fabricated and installed a Primary Explosives Waste Treatment System in a pilot environmental processing facility. Designed

  9. 40 CFR 450.21 - Effluent limitations reflecting the best practicable technology currently available (BPT).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... control technology currently available (BPT). (a) Erosion and sediment controls. Design, install and... minimum, such controls must be designed, installed and maintained to: (1) Control stormwater volume and... appropriate controls. (d) Pollution prevention measures. Design, install, implement, and maintain effective...

  10. 40 CFR 450.21 - Effluent limitations reflecting the best practicable technology currently available (BPT).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... control technology currently available (BPT). (a) Erosion and sediment controls. Design, install and... minimum, such controls must be designed, installed and maintained to: (1) Control stormwater volume and... appropriate controls. (d) Pollution prevention measures. Design, install, implement, and maintain effective...

  11. Superelastic Ball Bearings: Materials and Design to Avoid Mounting and Dismounting Brinell Damage in an Inaccessible Press-Fit Application-. I ; Design Approach

    NASA Technical Reports Server (NTRS)

    Dellacorte, Christopher; Howard, S. Adam

    2015-01-01

    Ball bearings require proper fit and installation into machinery structures (onto shafts and into bearing housings) to ensure optimal performance. For some applications, both the inner and outer race must be mounted with an interference fit and care must be taken during assembly and disassembly to avoid placing heavy static loads between the balls and races otherwise Brinell dent type damage can occur. In this paper, a highly dent resistant superelastic alloy, 60NiTi, is considered for rolling element bearing applications that encounter excessive static axial loading during assembly or disassembly. A small (R8) ball bearing is designed for an application in which access to the bearing races to apply disassembly tools is precluded. First Principles analyses show that by careful selection of materials, raceway curvature and land geometry, a bearing can be designed that allows blind assembly and disassembly without incurring raceway damage due to ball denting. Though such blind assembly applications are uncommon, the availability of bearings with unusually high static load capability may enable more such applications with additional benefits, especially for miniature bearings.

  12. Strategy Guideline: HVAC Equipment Sizing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burdick, A.

    The heating, ventilation, and air conditioning (HVAC) system is arguably the most complex system installed in a house and is a substantial component of the total house energy use. A right-sized HVAC system will provide the desired occupant comfort and will run efficiently. This Strategy Guideline discusses the information needed to initially select the equipment for a properly designed HVAC system. Right-sizing of an HVAC system involves the selection of equipment and the design of the air distribution system to meet the accurate predicted heating and cooling loads of the house. Right-sizing the HVAC system begins with an accurate understandingmore » of the heating and cooling loads on a space; however, a full HVAC design involves more than just the load estimate calculation - the load calculation is the first step of the iterative HVAC design procedure. This guide describes the equipment selection of a split system air conditioner and furnace for an example house in Chicago, IL as well as a heat pump system for an example house in Orlando, Florida. The required heating and cooling load information for the two example houses was developed in the Department of Energy Building America Strategy Guideline: Accurate Heating and Cooling Load Calculations.« less

  13. 30 CFR 57.9307 - Design, installation, and maintenance of railroads.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... railroads. 57.9307 Section 57.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF..., Railroads, and Loading and Dumping Sites § 57.9307 Design, installation, and maintenance of railroads. Roadbeds and all elements of the railroad tracks shall be designed, installed, and maintained to provide...

  14. Residential solar-heating system-design package

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Design package for modular solar heating system includes performance specifications, design data, installation guidelines, and other information that should be valuable to those interested in system (or similar systems) for projected installation. When installed in insulated "energy saver" home, system can supply large percentage of total energy needs of building.

  15. 40 CFR 450.21 - Effluent limitations reflecting the best practicable technology currently available (BPT).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... Design, install and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants. At a minimum, such controls must be designed, installed and maintained to: (1) Control... prohibited unless managed by appropriate controls. (d) Pollution prevention measures. Design, install...

  16. 40 CFR 450.21 - Effluent limitations reflecting the best practicable technology currently available (BPT).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... Design, install and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants. At a minimum, such controls must be designed, installed and maintained to: (1) Control... design, installation and maintenance of erosion and sediment controls must address factors such as the...

  17. 40 CFR 450.21 - Effluent limitations reflecting the best practicable technology currently available (BPT).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Design, install and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants. At a minimum, such controls must be designed, installed and maintained to: (1) Control... design, installation and maintenance of erosion and sediment controls must address factors such as the...

  18. Viper cabin-fuselage structural design concept with engine installation and wing structural design

    NASA Technical Reports Server (NTRS)

    Marchesseault, B.; Carr, D.; Mccorkle, T.; Stevens, C.; Turner, D.

    1993-01-01

    This report describes the process and considerations in designing the cabin, nose, drive shaft, and wing assemblies for the 'Viper' concept aircraft. Interfaces of these assemblies, as well as interfaces with the sections of the aircraft aft of the cabin, are also discussed. The results of the design process are included. The goal of this project is to provide a structural design which complies with FAR 23 requirements regarding occupant safety, emergency landing loads, and maneuvering loads. The design must also address the interfaces of the various systems in the cabin, nose, and wing, including the drive shaft, venting, vacuum, electrical, fuel, and control systems. Interfaces between the cabin assembly and the wing carrythrough and empennage assemblies were required, as well. In the design of the wing assemblies, consistency with the existing cabin design was required. The major areas considered in this report are materials and construction, loading, maintenance, environmental considerations, wing assembly fatigue, and weight. The first three areas are developed separately for the nose, cabin, drive shaft, and wing assemblies, while the last three are discussed for the entire design. For each assembly, loading calculations were performed to determine the proper sizing of major load carrying components. Table 1.0 lists the resulting margins of safety for these key components, along with the types of the loads involved, and the page number upon which they are discussed.

  19. Health Physics Code System for Evaluating Accidents Involving Radioactive Materials.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2014-10-01

    Version 03 The HOTSPOT Health Physics codes were created to provide Health Physics personnel with a fast, field-portable calculational tool for evaluating accidents involving radioactive materials. HOTSPOT codes provide a first-order approximation of the radiation effects associated with the atmospheric release of radioactive materials. The developer's website is: http://www.llnl.gov/nhi/hotspot/. Four general programs, PLUME, EXPLOSION, FIRE, and RESUSPENSION, calculate a downwind assessment following the release of radioactive material resulting from a continuous or puff release, explosive release, fuel fire, or an area contamination event. Additional programs deal specifically with the release of plutonium, uranium, and tritium to expedite an initial assessmentmore » of accidents involving nuclear weapons. The FIDLER program can calibrate radiation survey instruments for ground survey measurements and initial screening of personnel for possible plutonium uptake in the lung. The HOTSPOT codes are fast, portable, easy to use, and fully documented in electronic help files. HOTSPOT supports color high resolution monitors and printers for concentration plots and contours. The codes have been extensively used by the DOS community since 1985. Tables and graphical output can be directed to the computer screen, printer, or a disk file. The graphical output consists of dose and ground contamination as a function of plume centerline downwind distance, and radiation dose and ground contamination contours. Users have the option of displaying scenario text on the plots. HOTSPOT 3.0.1 fixes three significant Windows 7 issues: Executable installed properly under "Program Files/HotSpot 3.0". Installation package now smaller: removed dependency on older Windows DLL files which previously needed to; Forms now properly scale based on DPI instead of font for users who change their screen resolution to something other than 100%. This is a more common feature in Windows 7; Windows installer was starting everytime most users started the program, even after HotSpot was already installed. Now, after the program is installed the installer may come up once for each new user but only the first time they run HotSpot on a particular machine. So no user should see the installer come up more than once over many uses; and GPS capability updated to directly use a serial port through a USB connection. Non-USB connections should still work. Fixed table output inconsistencies for fire scenarios.« less

  20. Solar heating and hot water system installed at Charlotte Memorial Hospital, Charlotte, North Carolina

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Detailed information regarding the design and installation of a heating and hot water system in a commercial application is given. This information includes descriptions of system and building, design philosophy, control logic operation modes, design and installation drawing and a brief description of problems encountered and their solutions.

  1. 30 CFR 285.702 - What must I include in my Fabrication and Installation Report?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Facility Design, Fabrication, and Installation Reports § 285.702 What must I include in my Fabrication and... fabricated and installed in accordance with the design criteria identified in the Facility Design Report...

  2. 46 CFR 170.270 - Door design, operation, installation, and testing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Door design, operation, installation, and testing. 170.270 Section 170.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SUBDIVISION AND STABILITY STABILITY REQUIREMENTS FOR ALL INSPECTED VESSELS Watertight Bulkhead Doors § 170.270 Door design, operation, installation, and testing. (a...

  3. 46 CFR 170.270 - Door design, operation, installation, and testing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Door design, operation, installation, and testing. 170.270 Section 170.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SUBDIVISION AND STABILITY STABILITY REQUIREMENTS FOR ALL INSPECTED VESSELS Watertight Bulkhead Doors § 170.270 Door design, operation, installation, and testing. (a...

  4. 46 CFR 170.270 - Door design, operation, installation, and testing.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Door design, operation, installation, and testing. 170.270 Section 170.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SUBDIVISION AND STABILITY STABILITY REQUIREMENTS FOR ALL INSPECTED VESSELS Watertight Bulkhead Doors § 170.270 Door design, operation, installation, and testing. (a...

  5. Automated installation methods for photovoltaic arrays

    NASA Astrophysics Data System (ADS)

    Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.

    1982-11-01

    Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.

  6. 7. View (looking west) of the second floor corridor in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. View (looking west) of the second floor corridor in the south segment of building. The second floor was designed for residential rental rooms. The guardrail, balusters, newel posts, and handrail, as well as the two upper-level door openings with transoms, are original features. The doors, proper, are nonoriginal and probably were installed when the second floor was converted to office use. The pair of doors (one leaf is open and one is closed) is located at the intermediate stair landing. The original exterior doorway (without a door) is located at the bottom of the stair. The upper-level door without a transom is nonoriginal, as are the floor tile and wall paneling. At the time of documentation a suspended ceiling and duct were removed to ... - Stroud Building, 31-33 North Central Avenue, Phoenix, Maricopa County, AZ

  7. Interactive calculation procedures for mixed compression inlets

    NASA Technical Reports Server (NTRS)

    Reshotko, Eli

    1983-01-01

    The proper design of engine nacelle installations for supersonic aircraft depends on a sophisticated understanding of the interactions between the boundary layers and the bounding external flows. The successful operation of mixed external-internal compression inlets depends significantly on the ability to closely control the operation of the internal compression portion of the inlet. This portion of the inlet is one where compression is achieved by multiple reflection of oblique shock waves and weak compression waves in a converging internal flow passage. However weak these shocks and waves may seem gas-dynamically, they are of sufficient strength to separate a laminar boundary layer and generally even strong enough for separation or incipient separation of the turbulent boundary layers. An understanding was developed of the viscous-inviscid interactions and of the shock wave boundary layer interactions and reflections.

  8. Conceptual Design for the New RPI 2020 Linac

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adolphsen, C.; Bane, K.; Dolgashev, V.

    2014-10-29

    The Rensselaer Polytechnic Institute (RPI) spectrometer is an installation based on an L-band linear accelerator designed and installed many decades ago. While this installation has served many important experiments over the decades, a new more powerful and more flexible linac to serve a wider range of experiments is envisioned as an upgrade to the existing installation by 2020.

  9. Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.

    ERIC Educational Resources Information Center

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…

  10. Market opportunities for treated wooden guardrail posts in West Virginia

    Treesearch

    Gary R. Lindell

    1965-01-01

    At present practically no wooden guardrail posts are being installed along West Virginia's highways. Neither are concrete posts. Only steel posts are being used in new highway construction despite the fact that wooden posts that have been properly treated with a decay-preventing preservative are entirely acceptable to the State Highway Department. Furthermore,...

  11. 76 FR 77369 - Airworthiness Directives; Piaggio Aero Industries S.p.A. Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ... installed on the door handle for proper tightness and correct as necessary after applying a thread locker... thread locker following Part D of the Accomplishment Instructions in Piaggio Aero Industries S.p.A... necessary after applying a thread locker following Part D of the Accomplishment Instructions in Piaggio Aero...

  12. 14 CFR 125.183 - Carriage of cargo in passenger compartments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... prevent the cargo from shifting under emergency landing conditions. (8) The bin may not be installed in a position that obscures any passenger's view of the “seat belt” sign, “no smoking” sign, or any required... smoking” sign, or required exit sign, unless an auxiliary sign or other approved means for proper...

  13. 30 CFR 250.430 - When must I install a diverter system?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling... diverter system before you drill a conductor or surface hole. The diverter system consists of a diverter... the diverter system to ensure proper diversion of gases, water, drilling fluid, and other materials...

  14. 30 CFR 250.430 - When must I install a diverter system?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling... diverter system before you drill a conductor or surface hole. The diverter system consists of a diverter... the diverter system to ensure proper diversion of gases, water, drilling fluid, and other materials...

  15. 30 CFR 250.430 - When must I install a diverter system?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling... diverter system before you drill a conductor or surface hole. The diverter system consists of a diverter... the diverter system to ensure proper diversion of gases, water, drilling fluid, and other materials...

  16. 18 CFR 1304.101 - Nonnavigable houseboats.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... follows with a properly installed and operating Marine Sanitation Device (MSD) or Sewage Holding Tank and... or Type II MSD. (2) Nonnavigable houseboats moored in: “No Discharge Lakes” must be equipped with... equipped with a Type I or Type II MSD, it must be secured to prevent discharge into the lake. (d) Approved...

  17. 77 FR 55768 - Airworthiness Directives; The Boeing Company Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-11

    ... prompted by a report that during a test of the oxygen system, an operator found that the passenger oxygen masks did not properly flow oxygen, and that a loud noise occurred in the overhead area, which was... airplane oxygen system to ensure clamshell couplers are installed and fully latched, and corrective actions...

  18. 77 FR 36137 - Airworthiness Directives; AGUSTA S.p.A. Helicopters

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-18

    ... the upper end of collective control rod C2 to torque tube C3 is properly installed. This AD is... prevent separation of the collective control rod from the torque tube, loss of control of the collective... helicopters because the production quality control procedures did not require recording the applied torque on...

  19. Disposal of saltwater during well construction--Problems and solutions

    USGS Publications Warehouse

    Pitt, William A.; Meyer, Frederick W.; Hull, John E.

    1977-01-01

    The recent interest in the disposal of treated sewage effluent by deep-well injection into salt-water-filled aquifers has increased the need for proper disposal of salt water as more wells are drilled and tested each year.The effects on an unconfined aquifer of the improper disposal of salt water associated with the construction of three wells in southeastern Florida emphasize this need. In two of the wells provisions to prevent and detect salt-water contamination of the unconfined aquifer were practically nonexistent, and in one well extensive provisions were made. Of the three drilling sites the one with proper provision for detection presented no serious problem, as the ground water contaminated by the salt water was easily located and removed. The provisions consisted of drilling a brine-injection well to dispose of salt water discharged in drilling and testing operations, using a closed drilling circulation system to reduce spillage, installing shallow observation wells to map the extent and depth of any salt-water contamination of the shallow aquifer, and installing a dewatering system to remove contaminated ground water.

  20. Thermal neutron filter design for the neutron radiography facility at the LVR-15 reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soltes, Jaroslav; Faculty of Nuclear Sciences and Physical Engineering, CTU in Prague,; Viererbl, Ladislav

    2015-07-01

    In 2011 a decision was made to build a neutron radiography facility at one of the unused horizontal channels of the LVR-15 research reactor in Rez, Czech Republic. One of the key conditions for operating an effective radiography facility is the delivery of a high intensity, homogeneous and collimated thermal neutron beam at the sample location. Additionally the intensity of fast neutrons has to be kept as low as possible as the fast neutrons may damage the detectors used for neutron imaging. As the spectrum in the empty horizontal channel roughly copies the spectrum in the reactor core, which hasmore » a high ratio of fast neutrons, neutron filter components have to be installed inside the channel in order to achieve desired beam parameters. As the channel design does not allow the instalment of complex filters and collimators, an optimal solution represent neutron filters made of large single-crystal ingots of proper material composition. Single-crystal silicon was chosen as a favorable filter material for its wide availability in sufficient dimensions. Besides its ability to reasonably lower the ratio of fast neutrons while still keeping high intensities of thermal neutrons, due to its large dimensions, it suits as a shielding against gamma radiation from the reactor core. For designing the necessary filter dimensions the Monte-Carlo MCNP transport code was used. As the code does not provide neutron cross-section libraries for thermal neutron transport through single-crystalline silicon, these had to be created by approximating the theory of thermal neutron scattering and modifying the original cross-section data which are provided with the code. Carrying out a series of calculations the filter thickness of 1 m proved good for gaining a beam with desired parameters and a low gamma background. After mounting the filter inside the channel several measurements of the neutron field were realized at the beam exit. The results have justified the expected calculated values. After the successful filter installing and a series of measurements, first test neutron radiography attempts with test samples could been carried out. (authors)« less

  1. Experimental Investigation on Design Enhancement of Axial Fan Using Fixed Guide Vane

    NASA Astrophysics Data System (ADS)

    Munisamy, K. M.; Govindasamy, R.; Thangaraju, S. K.

    2015-09-01

    Airflow passes through the rotating blade in an axial flow fan will experience a helical flow pattern. This swirling effect leads the system to experience swirl energy losses or pressure drop yet reducing the total efficiency of the fan system. A robust tool to encounter this air spin past the blade is by introducing guide vane to the system. Owing to its importance, a new approach in designing outlet guide vane design for a commercial usage 1250mm diameter axial fan with a 30° pitch angle impeller has been introduced in this paper. A single line metal of proper curvature guide vane design technique has been adopted for this study. By choosing fan total efficiency as a target variable to be improved, the total and static pressure on the design point were set to be constraints. Therefore, the guide vane design was done based on the improvement target on the static pressure in system. The research shows that, with the improvement in static pressure by 29.63% through guide vane installation, the total fan efficiency is increased by 5.12%, thus reduces the fan power by 5.32%. Good agreement were found, that when the fan total efficiency increases, the power consumption of the fan is reduced. Therefore, this new approach of guide vane design can be applied to improve axial fan performance.

  2. Design and test of voltage and current probes for EAST ICRF antenna impedance measurement

    NASA Astrophysics Data System (ADS)

    Jianhua, WANG; Gen, CHEN; Yanping, ZHAO; Yuzhou, MAO; Shuai, YUAN; Xinjun, ZHANG; Hua, YANG; Chengming, QIN; Yan, CHENG; Yuqing, YANG; Guillaume, URBANCZYK; Lunan, LIU; Jian, CHENG

    2018-04-01

    On the experimental advanced superconducting tokamak (EAST), a pair of voltage and current probes (V/I probes) is installed on the ion cyclotron radio frequency transmission lines to measure the antenna input impedance, and supplement the conventional measurement technique based on voltage probe arrays. The coupling coefficients of V/I probes are sensitive to their sizes and installing locations, thus they should be determined properly to match the measurement range of data acquisition card. The V/I probes are tested in a testing platform at low power with various artificial loads. The testing results show that the deviation of coupling resistance is small for loads R L > 2.5 Ω, while the resistance deviations appear large for loads R L < 1.5 Ω, which implies that the power loss cannot be neglected at high VSWR. As the factors that give rise to the deviation of coupling resistance calculation, the phase measurement error is the more significant factor leads to deleterious results rather than the amplitude measurement error. To exclude the possible ingredients that may lead to phase measurement error, the phase detector can be calibrated in steady L-mode scenario and then use the calibrated data for calculation under H-mode cases in EAST experiments.

  3. Squid - a simple bioinformatics grid.

    PubMed

    Carvalho, Paulo C; Glória, Rafael V; de Miranda, Antonio B; Degrave, Wim M

    2005-08-03

    BLAST is a widely used genetic research tool for analysis of similarity between nucleotide and protein sequences. This paper presents a software application entitled "Squid" that makes use of grid technology. The current version, as an example, is configured for BLAST applications, but adaptation for other computing intensive repetitive tasks can be easily accomplished in the open source version. This enables the allocation of remote resources to perform distributed computing, making large BLAST queries viable without the need of high-end computers. Most distributed computing / grid solutions have complex installation procedures requiring a computer specialist, or have limitations regarding operating systems. Squid is a multi-platform, open-source program designed to "keep things simple" while offering high-end computing power for large scale applications. Squid also has an efficient fault tolerance and crash recovery system against data loss, being able to re-route jobs upon node failure and recover even if the master machine fails. Our results show that a Squid application, working with N nodes and proper network resources, can process BLAST queries almost N times faster than if working with only one computer. Squid offers high-end computing, even for the non-specialist, and is freely available at the project web site. Its open-source and binary Windows distributions contain detailed instructions and a "plug-n-play" instalation containing a pre-configured example.

  4. Operational test report -- Project W-320 cathodic protection systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bowman, T.J.

    1998-06-16

    Washington Administrative Code (WAC) 173-303-640 specifies that corrosion protection must be designed into tank systems that treat or store dangerous wastes. Project W-320, Waste Retrieval Sluicing System (WRSS), utilizes underground encased waste transfer piping between tanks 241-C-106 and 241-AY-102. Corrosion protection is afforded to the encasements of the WRSS waste transfer piping through the application of earthen ionic currents onto the surface of the piping encasements. Cathodic protection is used in conjunction with the protective coatings that are applied upon the WRSS encasement piping. WRSS installed two new two rectifier systems (46 and 47) and modified one rectifier system (31).more » WAC 173-303-640 specifies that the proper operation of cathodic protection systems must be confirmed within six months after initial installation. The WRSS cathodic protection systems were energized to begin continuous operation on 5/5/98. Sixteen days after the initial steady-state start-up of the WRSS rectifier systems, the operational testing was accomplished with procedure OTP-320-006 Rev/Mod A-0. This operational test report documents the OTP-320-006 results and documents the results of configuration testing of integrated piping and rectifier systems associated with the W-320 cathodic protection systems.« less

  5. A study of electro-mechanical and infrastructure instrumentation facilities in environmental laboratory.

    PubMed

    Dhawangale, R M; Kawale, S M; Waghmare, Maya; Pandya, G H; Kondawar, V K

    2006-01-01

    Environmental laboratories carry out measurement and analysis of a number of physical, chemical and biological parameters. Each parameter requires some sort of instrument for its determination. Providing efficient instrumentation services to various departments of the Institute is an stupendous task. Instrumentation services in the form of installation, operation, repair and maintenanace of electro-mechanical equipment requires an in-depth experience and knowledge of the working, fabrication, design and repair of similar type of instruments so that the need of space, installation pre-requisites, budget constraints, availability of essential spares parts could be assessed. The paper discusses the operation of an environmental instrument repairs and maintenance, and audio-visual facilities. Suggestions for drafting of the proper specifications for procurement of laboratory equipments, such as ovens, furnaces, refrigerators, blowers, audio visual aids, and spares and accessories are given in this paper. The paper also gives the detailed information on various aspects that are needed for checking and testing of the equipment against specification before putting it in operational use. Development of a preventive maintenance program involving QC checks and keeping an inventory of essential spares required are also discussed in this paper. It is felt that such services are essential in providing smooth support to carry out research and development activities of the Institute.

  6. Experimental investigation of the dynamic installation of a slip joint connection between the monopile and tower of an offshore wind turbine

    NASA Astrophysics Data System (ADS)

    Segeren, M. L. A.; Hermans, K. W.

    2014-06-01

    The failure of the traditional grouted connections of offshore wind turbines has led to the investigation of alternatives that provide a connection between the foundation pile and the turbine tower. An alternative to the traditional joint is a steel-to-steel connection also called a slip joint. To ensure a proper fit of the slip joint a dynamic installation of the joint is proposed. In this contribution, the effectiveness of harmonic excitation as an installation procedure is experimentally investigated using a 1:10 scaled model of the joint. During the dynamic installation test the applied static load, settlements and dynamic response of the joint are monitored using respectively load cells, taut wires and strain gauges placed both inside and outside the conical surfaces. The results show that settlement occurs only when applying a harmonic load at specific forcing frequencies. The settlement stabilizes to a certain level for each of the specific frequencies, indicating that a controlled way of installation is possible. The results show that it is essential to vibrate at specific frequencies and that a larger amplitude of the harmonic force does not automatically lead to additional settlement.

  7. Design Considerations | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  8. Usability issues concerning child restraint system harness design.

    PubMed

    Rudin-Brown, Christina M; Kumagai, Jason K; Angel, Harry A; Iwasa-Madge, Kim M; Noy, Y Ian

    2003-05-01

    A study was conducted to assess usability issues relating to child restraint system (CRS) harness design. Four convertible child restraint systems representing a wide variety of design features were used. Forty-two participants installed two child test dummies in both forward- and rear-facing configurations either inside or outside a test vehicle. Observer-scored checklists determined the degree to which each harness was installed correctly. Participant-scored questionnaires evaluated the 'ease-of-use' of various design features. While the percentage of correct installations exceeded 83% for all designs when installed in the forward-facing configuration, in the rear-facing position (that intended for children under 9-10 kg), there was a significant (between 65 and 89%) percentage of incorrect installations for all models. This finding is of particular interest and may be indicative of a more generalized problem with 'convertible' CRS designs when they are used in the rear-facing configuration. Furthermore, while certain design features were perceived by users as providing significantly better protection in the event of a collision, these also tended to be the features that were misused most often. The benefits and costs of various design features are discussed, and a method to test harness design usability is presented.

  9. Korean standard nuclear plant ex-vessel neutron dosimetry program Ulchin 4

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duo, J.I.; Chen, J.; Kulesza, J.A.

    2011-07-01

    A comprehensive ex-vessel neutron dosimetry (EVND) surveillance program has been deployed in 16 pressurized water reactors (PWR) in South Korea and EVND dosimetry sets have already been installed and analyzed in Westinghouse reactor designs. In this paper, the unique features of the design, training, and installation in the Korean standard nuclear plant (KSNP) Ulchin Unit 4 are presented. Ulchin Unit 4 Cycle 9 represents the first dosimetry analyzed from the EVND design deployed in KSNP plants: Yonggwang Units 3 through 6 and Ulchin Units 3 through 6. KSNP's cavity configuration precludes a conventional installation from the cavity floor. The solution,more » requiring the installation crew to access the cavity at an elevation of the active core, places a premium on rapid installation due to high area dose rates. Numerous geometrical features warranted the use of a detailed design in true 3D mechanical design software to control interferences. A full-size training mockup maximized the crew ability to correctly install the instrument in minimum time. The analysis of the first dosimetry set shows good agreements between measurement and calculation within the associated uncertainties. A complete EVND system has been successfully designed, installed, and analyzed for a KNSP plant. Current and future EVND analyses will continue supporting the successful operation of PWR units in South Korea. (authors)« less

  10. Small Water System Operations and Maintenance. A Field Study Training Program. Second Edition.

    ERIC Educational Resources Information Center

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of small water systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide small water system operators with the knowledge and skills required to operate and maintain these systems…

  11. 77 FR 51619 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    ... Energy and Non-Air Quality Environmental Impacts C. Comments on Factor Three--Existing Controls at FCPP D... compliance, (2) the energy and non-air quality environmental impacts of compliance, (3) any pollution control... installing and operating any of several equivalent controls on Units 1- 3, and through proper operation of...

  12. 24 CFR 3286.107 - Installation in accordance with standards.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Certification of Installation in HUD... requirements. (1) For purposes of determining installer compliance, a manufactured home that is subject to the requirements of this subpart B must be installed in accordance with: (i) An installation design and...

  13. 24 CFR 3286.413 - Recordkeeping.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... requirements of this part; and (6) A copy of foundation designs used to install the home, if different from the... DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in HUD... the installation work and the address of the home installed; (2) A copy of the contract pursuant to...

  14. 24 CFR 3286.405 - Installation suitability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... plate required by § 3280.5 of this chapter is affixed to the home, that the home is designed for the... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in... installing a manufactured home at any site, the installer must assure that the site is suitable for...

  15. 40 CFR Table 3 to Subpart Rrr of... - Summary of Monitoring Requirements for New and Existing Affected Sources and Emission Units

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... output from bag leak detector. COM or Design and install in accordance with PS-1; collect data in... Detection Guidance c; record voltage output from bag leak detector. COM Design and Install in accordance... Guidance” c; record output voltage from bag leak detector. COM Design and install in accordance with PS-1...

  16. 40 CFR Table 3 to Subpart Rrr of... - Summary of Monitoring Requirements for New and Existing Affected Sources and Emission Units

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... output from bag leak detector. COM or Design and install in accordance with PS-1; collect data in... Detection Guidance c; record voltage output from bag leak detector. COM Design and Install in accordance... Guidance” c; record output voltage from bag leak detector. COM Design and install in accordance with PS-1...

  17. Design Guidance for New Windows | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  18. Design Guidance for Replacement Windows | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  19. Virtual environment display for a 3D audio room simulation

    NASA Astrophysics Data System (ADS)

    Chapin, William L.; Foster, Scott

    1992-06-01

    Recent developments in virtual 3D audio and synthetic aural environments have produced a complex acoustical room simulation. The acoustical simulation models a room with walls, ceiling, and floor of selected sound reflecting/absorbing characteristics and unlimited independent localizable sound sources. This non-visual acoustic simulation, implemented with 4 audio ConvolvotronsTM by Crystal River Engineering and coupled to the listener with a Poihemus IsotrakTM, tracking the listener's head position and orientation, and stereo headphones returning binaural sound, is quite compelling to most listeners with eyes closed. This immersive effect should be reinforced when properly integrated into a full, multi-sensory virtual environment presentation. This paper discusses the design of an interactive, visual virtual environment, complementing the acoustic model and specified to: 1) allow the listener to freely move about the space, a room of manipulable size, shape, and audio character, while interactively relocating the sound sources; 2) reinforce the listener's feeling of telepresence into the acoustical environment with visual and proprioceptive sensations; 3) enhance the audio with the graphic and interactive components, rather than overwhelm or reduce it; and 4) serve as a research testbed and technology transfer demonstration. The hardware/software design of two demonstration systems, one installed and one portable, are discussed through the development of four iterative configurations. The installed system implements a head-coupled, wide-angle, stereo-optic tracker/viewer and multi-computer simulation control. The portable demonstration system implements a head-mounted wide-angle, stereo-optic display, separate head and pointer electro-magnetic position trackers, a heterogeneous parallel graphics processing system, and object oriented C++ program code.

  20. 30 CFR 285.708 - What are the CVA's or project engineer's primary duties for fabrication and installation review?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Facility Design, Fabrication, and Installation Certified... Facility Design Report and Fabrication and Installation Report. (1) If the CVA or project engineer finds...

  1. 30 CFR 285.710 - When conducting onsite installation inspections, what must the CVA or project engineer do?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Facility Design, Fabrication, and Installation Certified Verification Agent... Facility Design Report and the Fabrication and Installation Report. (b) For a fixed or floating facility...

  2. 46 CFR 120.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false General design, installation, and maintenance requirements. 120.200 Section 120.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION General...

  3. 46 CFR 120.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false General design, installation, and maintenance requirements. 120.200 Section 120.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION General...

  4. Design of practical alignment device in KSTAR Thomson diagnostic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, J. H., E-mail: jhlee@nfri.re.kr; University of Science and Technology; Lee, S. H.

    2016-11-15

    The precise alignment of the laser path and collection optics in Thomson scattering measurements is essential for accurately determining electron temperature and density in tokamak experiments. For the last five years, during the development stage, the KSTAR tokamak’s Thomson diagnostic system has had alignment fibers installed in its optical collection modules, but these lacked a proper alignment detection system. In order to address these difficulties, an alignment verifying detection device between lasers and an object field of collection optics is developed. The alignment detection device utilizes two types of filters: a narrow laser band wavelength for laser, and a broadmore » wavelength filter for Thomson scattering signal. Four such alignment detection devices have been successfully developed for the KSTAR Thomson scattering system in this year, and these will be tested in KSTAR experiments in 2016. In this paper, we present the newly developed alignment detection device for KSTAR’s Thomson scattering diagnostics.« less

  5. Flight evaluation of an advanced technology light twin-engine airplane (ATLIT)

    NASA Technical Reports Server (NTRS)

    Holmes, B. J.

    1977-01-01

    Project organization and execution, airplane description and performance predictions, and the results of the flight evaluation of an advanced technology light twin engine airplane (ATLIT) are presented. The ATLIT is a Piper PA-34-200 Seneca I modified by the installation of new wings incorporating the GA(W)-1 (Whitcomb) airfoil, reduced wing area, roll control spoilers, and full span Fowler flaps. The conclusions for the ATLIT evaluation are based on complete stall and roll flight test results and partial performance test results. The Stalling and rolling characteristics met design expectations. Climb performance was penalized by extensive flow separation in the region of the wing body juncture. Cruise performance was found to be penalized by a large value of zero lift drag. Calculations showed that, with proper attention to construction details, the improvements in span efficiency and zero lift drag would permit the realization of the predicted increases in cruising and maximum rate of climb performance.

  6. Solar energy facility at North Hampton Recreation Center, Dallas, Texas

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar energy facility located at the North Hampton Park Recreation and Health Center, Dallas, Texas is presented. The solar energy system is installed in a single story (two heights), 16,000 sq ft building enclosing a gymnasium, locker area, and health care clinic surrounded by a recreational area and athletic field. The solar energy system is designed to provide 80 percent of the annual space heating, 48 percent of the annual space cooling, and 90 percent of the domestic hot water requirements. The system's operation modes and performance data acquisition system are described. The system's performance during the months of June, July, August, September, and October of 1979 are presented and show a negative savings of energy. Experience to date indicates however that the system concept has promise of acceptable performance. It is concluded that if proper control and sequencing components was maintained, then the system performance would improve to an acceptable level.

  7. Design of practical alignment device in KSTAR Thomson diagnostic.

    PubMed

    Lee, J H; Lee, S H; Yamada, I

    2016-11-01

    The precise alignment of the laser path and collection optics in Thomson scattering measurements is essential for accurately determining electron temperature and density in tokamak experiments. For the last five years, during the development stage, the KSTAR tokamak's Thomson diagnostic system has had alignment fibers installed in its optical collection modules, but these lacked a proper alignment detection system. In order to address these difficulties, an alignment verifying detection device between lasers and an object field of collection optics is developed. The alignment detection device utilizes two types of filters: a narrow laser band wavelength for laser, and a broad wavelength filter for Thomson scattering signal. Four such alignment detection devices have been successfully developed for the KSTAR Thomson scattering system in this year, and these will be tested in KSTAR experiments in 2016. In this paper, we present the newly developed alignment detection device for KSTAR's Thomson scattering diagnostics.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gupta, Prabhat Kumar; Rabehl, Roger

    Thermo-acoustic oscillations are a commonly observed phenomenon in helium cryogenic systems, especially in tubes connecting hot and cold areas. The open ends of these tubes are connected to the lower temperature (typically at 4.2 K), and the closed ends of these tubes are connected to the high temperature (300K). Cryogenic instrumentation installations provide ideal conditions for these oscillations to occur due to the steep temperature gradient along the tubing. These oscillations create errors in measurements as well as an undesirable heat load to the system. The work presented here develops engineering guidelines to design oscillation-free helium piping. This work alsomore » studies the effect of different piping inserts and shows how the proper geometrical combinations have to be chosen to avoid thermo-oscillations. The effect of an 80 K intercept is also studied and shows that thermo-oscillations can be dampened by placing the intercept at an appropriate location.« less

  9. Langley 8-foot high-temperature tunnel oxygen measurement system

    NASA Technical Reports Server (NTRS)

    Sprinkle, Danny R.; Chen, Tony D.; Chaturvedi, Sushil K.

    1991-01-01

    In order to ensure that there is a proper amount of oxygen necessary for sustaining test engine operation for hypersonic propulsion systems testing at the NASA Langley 8-foot high-temperature tunnel, a quickly responding real-time measurement system of test section oxygen concentration has been designed and tested at Langley. It is built around a zirconium oxide-based sensor which develops a voltage proportional to the oxygen partial pressure of the test gas. The voltage signal is used to control the amount of oxygen being injected into the combustor air. The physical operation of the oxygen sensor is described, as well as the sampling system used to extract the test gas from the tunnel test section. Results of laboratory tests conducted to verify sensor accuracy and response time performance are discussed, as well as the final configuration of the system to be installed in the tunnel.

  10. Opto-box: Optical modules and mini-crate for ATLAS pixel and IBL detectors

    NASA Astrophysics Data System (ADS)

    Bertsche, David

    2016-11-01

    The opto-box is a custom mini-crate for housing optical modules which process and transfer optoelectronic data. Many novel solutions were developed for the custom design and manufacturing. The system tightly integrates electrical, mechanical, and thermal functionality into a small package of size 35×10x8 cm3. Special attention was given to ensure proper shielding, grounding, cooling, high reliability, and environmental tolerance. The custom modules, which incorporate Application Specific Integrated Circuits, were developed through a cycle of rigorous testing and redesign. In total, fourteen opto-boxes have been installed and loaded with modules on the ATLAS detector. They are currently in operation as part of the LHC run 2 data read-out chain. This conference proceeding is in support of the poster presented at the International Conference on New Frontiers in Physics (ICNFP) 2015 [1].

  11. Gas processing developments. Why not use methanol for hydrate control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nielsen, R.B.; Bucklin, R.W.

    1983-04-01

    Hydrate formation in turboexpander plants can be avoided more economically by using methanol than by using solid bed dehydration. Although the first turboexpander plant used methanol, most expander installations now have used solid bed dehydration. The reasons are obscure, since methanol often grants greater ease of operation as well as lower capital and operating costs, especially when the water in the feed gas is low or when recompression is required. Natural gas generally contains water before processing. High pressure, low temperature, or both favor the combination of water with light gases to form hydrates. Free water always must be presentmore » for hydrates to form. Hydrates cause problems by plugging pipelines, valves, and other process equipment. Therefore, proper equipment design requires accurate prediction of the limiting conditions at which hydrates are formed anytime a gas stream containing hydrate formers and free water is cooled below 80 F. (16 refs.)« less

  12. 40 CFR Table 3 to Subpart Rrr of... - Summary of Monitoring Requirements for New and Existing Affected Sources and Emission Units

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... or Design and install in accordance with PS-1; collect data in accordance with subpart A of 40 CFR... from bag leak detector. COM Design and Install in accordance with PS-1; collect data in accordance with... output voltage from bag leak detector. COM Design and install in accordance with PS-1; collect data in...

  13. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Specifications for the Design, Installation and Operation of a Part Flow System for Control of Overboard Discharges E Appendix E to Part 157... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for...

  14. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Specifications for the Design, Installation and Operation of a Part Flow System for Control of Overboard Discharges E Appendix E to Part 157... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for...

  15. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Specifications for the Design, Installation and Operation of a Part Flow System for Control of Overboard Discharges E Appendix E to Part 157... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for...

  16. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Specifications for the Design, Installation and Operation of a Part Flow System for Control of Overboard Discharges E Appendix E to Part 157... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for...

  17. Instructor's Manual for Teaching and Practical Courses on Design of Systems and Sizing, Installation and Operation of Systems for Solar Heating and Cooling of Residential Buildings.

    ERIC Educational Resources Information Center

    Colorado State Univ., Ft. Collins. Solar Energy Applications Lab.

    Presented are guidelines for instructors of two courses in the design, installation, and operation of solar heating and cooling systems. These courses are: (1) Design of Systems, and (2) Sizing, Installation, and Operation of Systems. Limited in scope to active solar systems for residential buildings, these courses place primary emphasis upon…

  18. Analysis and design of trial well mooring in deepwater of the South China Sea

    NASA Astrophysics Data System (ADS)

    Guo, Yongfeng; Ji, Shaojun; Tang, Changquan; Li, Jiansong; Zhong, Huiquan; Ian, Ong Chin Yam

    2012-06-01

    Mooring systems play an important role for semi-submersible rigs that drill in deepwater. A detailed analysis was carried out on the mooring of a semi-submersible rig that conducted a trial well drilling at a deepwater location in the South China Sea in 2009. The rig was 30 years old and had a shallow platform with a designed maximum operating water depth of 457 m. Following the mooring analysis, a mooring design was given that requires upgrading of the rig's original mooring system. The upgrade included several innovations, such as installing eight larger anchors, i.e. replacing the original anchors and inserting an additional 600 m of steel wires with the existing chains. All this was done to enhance the mooring capability of the rig in order for the rig to be held in position to conduct drilling at a water depth of 476 m. The overall duration of the drilling was 50 days and the upgraded mooring system proved to be efficient in achieving the goal of keeping the rig stationary while it was drilling the trial well in the South China Sea. This successful campaign demonstrates that an older semi-submersible rig can take on drilling in deep water after careful design and proper upgrading and modification to the original mooring system.

  19. Benefits of production extension and shifting with thermal storage for a 1MW CSP-ORC plant in Morocco

    NASA Astrophysics Data System (ADS)

    Bennouna, El Ghali; Mimet, Abdelaziz; Frej, Hicham

    2016-05-01

    The importance of thermal storage for commercial CSP (concentrated Solar Power) plants has now become obvious, this regardless of the solar technology used and the power cycle. The availability of a storage system to a plant operator brings a lot of possibilities for production management, cash flow optimization and grid stabilizing. In particular, and depending on plant location and local grid strategy, thermal storage can contribute, when wisely used, to control production and adapt it to the demand and / or power unbalances and varying prices. Storage systems design, sizing and configuration are proper to each power plant, hence systems that are now widely installed within large commercial solar plants are not necessarily suited for small scale decentralized production, and will not have the same effects. In this paper the benefits of thermal storage are studied for a 1MWe CSP plant with an ORC (Organic Rankine Cycle), this plant has many specific features which call for a detail analysis about the appropriate storage design and optimum operating strategies for decentralized solutions.

  20. 30 CFR 75.335 - Seal strengths, design applications, and installation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... properties, construction specifications, quality control, design references, and other information related to... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Seal strengths, design applications, and... Seal strengths, design applications, and installation. (a) Seal strengths. Seals constructed on or...

  1. 30 CFR 75.335 - Seal strengths, design applications, and installation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... properties, construction specifications, quality control, design references, and other information related to... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Seal strengths, design applications, and... Seal strengths, design applications, and installation. (a) Seal strengths. Seals constructed on or...

  2. 30 CFR 75.335 - Seal strengths, design applications, and installation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... properties, construction specifications, quality control, design references, and other information related to... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Seal strengths, design applications, and... Seal strengths, design applications, and installation. (a) Seal strengths. Seals constructed on or...

  3. 30 CFR 75.335 - Seal strengths, design applications, and installation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... properties, construction specifications, quality control, design references, and other information related to... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Seal strengths, design applications, and... Seal strengths, design applications, and installation. (a) Seal strengths. Seals constructed on or...

  4. 30 CFR 75.335 - Seal strengths, design applications, and installation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... properties, construction specifications, quality control, design references, and other information related to... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Seal strengths, design applications, and... Seal strengths, design applications, and installation. (a) Seal strengths. Seals constructed on or...

  5. 41 CFR 102-74.340 - Who is responsible for monitoring and controlling areas designated for smoking by an agency head...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... with proper signage? 102-74.340 Section 102-74.340 Public Contracts and Property Management Federal... designated for smoking by an agency head and for identifying those areas with proper signage? Agency heads... smoking and identifying these areas with proper signage. Suitable, uniform signs reading “Designated...

  6. 41 CFR 102-74.340 - Who is responsible for monitoring and controlling areas designated for smoking by an agency head...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... with proper signage? 102-74.340 Section 102-74.340 Public Contracts and Property Management Federal... designated for smoking by an agency head and for identifying those areas with proper signage? Agency heads... smoking and identifying these areas with proper signage. Suitable, uniform signs reading “Designated...

  7. 41 CFR 102-74.340 - Who is responsible for monitoring and controlling areas designated for smoking by an agency head...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... with proper signage? 102-74.340 Section 102-74.340 Public Contracts and Property Management Federal... designated for smoking by an agency head and for identifying those areas with proper signage? Agency heads... smoking and identifying these areas with proper signage. Suitable, uniform signs reading “Designated...

  8. 41 CFR 102-74.340 - Who is responsible for monitoring and controlling areas designated for smoking by an agency head...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... with proper signage? 102-74.340 Section 102-74.340 Public Contracts and Property Management Federal... designated for smoking by an agency head and for identifying those areas with proper signage? Agency heads... smoking and identifying these areas with proper signage. Suitable, uniform signs reading “Designated...

  9. 41 CFR 102-74.340 - Who is responsible for monitoring and controlling areas designated for smoking by an agency head...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... with proper signage? 102-74.340 Section 102-74.340 Public Contracts and Property Management Federal... designated for smoking by an agency head and for identifying those areas with proper signage? Agency heads... smoking and identifying these areas with proper signage. Suitable, uniform signs reading “Designated...

  10. Replacement Windows for Existing Homes Homes | Efficient Windows

    Science.gov Websites

    Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Selection Tool will take you through a series of design conditions pertaining to your design and location

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roach, Dennis Patrick; Rackow, Kirk A.

    A typical aircraft can experience over 2,000 fatigue cycles (cabin pressurizations) and even greater flight hours in a single year. An unavoidable by-product of aircraft use is that crack, impact, and corrosion flaws develop throughout the aircraft's skin and substructure elements. Economic barriers to the purchase of new aircraft have placed even greater demands on efficient and safe repair methods. The use of bonded composite doublers offers the airframe manufacturers and aircraft maintenance facilities a cost effective method to safely extend the lives of their aircraft. Instead of riveting multiple steel or aluminum plates to facilitate an aircraft repair, itmore » is now possible to bond a single Boron-Epoxy composite doubler to the damaged structure. The FAA's Airworthiness Assurance Center at Sandia National Labs (AANC), Boeing, and Federal Express completed a pilot program to validate and introduce composite doubler repair technology to the U.S. commercial aircraft industry. This project focused on repair of DC-10 fuselage structure and its primary goal was to demonstrate routine use of this repair technology using niche applications that streamline the design-to-installation process. As composite doubler repairs gradually appear in the commercial aircraft arena, successful flight operation data is being accumulated. These commercial aircraft repairs are not only demonstrating the engineering and economic advantages of composite doubler technology but they are also establishing the ability of commercial maintenance depots to safely adopt this repair technique. This report presents the array of engineering activities that were completed in order to make this technology available for widespread commercial aircraft use. Focused laboratory testing was conducted to compliment the field data and to address specific issues regarding damage tolerance and flaw growth in composite doubler repairs. Fatigue and strength tests were performed on a simulated wing repair using a substandard design and a flawed installation. In addition, the new Sol-Gel surface preparation technique was evaluated. Fatigue coupon tests produced Sol-Gel results that could be compared with a large performance database from conventional, riveted repairs. It was demonstrated that not only can composite doublers perform well in severe off-design conditions (low doubler stiffness and presence of defects in doubler installation) but that the Sol-Gel surface preparation technique is easier and quicker to carry out while still producing optimum bonding properties. Nondestructive inspection (NDI) methods were developed so that the potential for disbond and delamination growth could be monitored and crack growth mitigation could be quantified. The NDI methods were validated using full-scale test articles and the FedEx aircraft installations. It was demonstrated that specialized NDI techniques can detect flaws in composite doubler installations before they reach critical size. Probability of Detection studies were integrated into the FedEx training in order to quantify the ability of aircraft maintenance depots to properly monitor these repairs. In addition, Boeing Structural Repair and Nondestructive Testing Manuals were modified to include composite doubler repair and inspection procedures. This report presents the results from the FedEx Pilot Program that involved installation and surveillance of numerous repairs on operating aircraft. Results from critical NDI evaluations are reported in light of damage tolerance assessments for bonded composite doublers. This work has produced significant interest from airlines and aircraft manufacturers. The successful Pilot Program produced flight performance history to establish the durability of bonded composite patches as a permanent repair on commercial aircraft structures. This report discusses both the laboratory data and Pilot Program results from repair installations on operating aircraft to introduce composite doubler repairs into mainstream commercial aircraft use.« less

  12. A Methodology for Successful MIS Projects

    PubMed Central

    Jacobs, Patt

    1988-01-01

    St. Vincent Hospital and Medical Center (SVHMC) was one of the Pacific Northwests' first hospitals to install a Medical Information System (MIS). In mid 1985 the hospital was confronted with the fact that vendor support of its MIS would be withdrawn in the near future. In 21 months a complete, fully operational MIS had to be selected, installed, and implemented. MIS projects are large, complicated sets of interrelated tasks organized to achieve a specific goal for an organization. Project management requires a sound methodology to deliver proper and necessary functions, on time, within budget, and that meet user expectations. This paper focuses on the process used to deliver the SIMON System on time and 15% under budget.

  13. KSC-07pd2024

    NASA Image and Video Library

    2007-07-19

    KENNEDY SPACE CENTER, Fla. -- In the Orbiter Processing Facility bay 3, a crane moves the main bus switching unit that will be installed in Discovery's payload bay. The unit is part of the payload on mission STS-120. A main bus switching unit is used for power distribution, circuit protection and fault isolation on the space station's power system. The units route power to proper locations in the space station, such as from solar arrays through umbilicals into the U.S. Lab. The unit will be installed on the external stowage platform 2 attached to the Quest airlock for temporary storage. Discovery is targeted to launch mission STS-120 no earlier than Oct. 20. Photo credit: NASA/Jim Grossmann

  14. KSC-07pd2023

    NASA Image and Video Library

    2007-07-19

    KENNEDY SPACE CENTER, Fla. -- In the Orbiter Processing Facility bay 3, a crane lifts the main bus switching unit that will be installed in Discovery's payload bay. The unit is part of the payload on mission STS-120. A main bus switching unit is used for power distribution, circuit protection and fault isolation on the space station's power system. The units route power to proper locations in the space station, such as from solar arrays through umbilicals into the U.S. Lab. The unit will be installed on the external stowage platform 2 attached to the Quest airlock for temporary storage. Discovery is targeted to launch mission STS-120 no earlier than Oct. 20. Photo credit: NASA/Jim Grossmann

  15. Effects of long-term exposure on LDEF fastener assemblies

    NASA Astrophysics Data System (ADS)

    Spear, Steve; Dursch, Harry

    1992-09-01

    This presentation summarizes the Systems Special Investigations Group (SIG) findings from testing and analysis of fastener assemblies used on the Long Duration Exposure Facility (LDEF) structure, the tray mounting clamps, and by the various experimenters. The LDEF deintegration team and several experimenters noted severe fastener damage and hardware removal difficulties during post-flight activities. The System SIG has investigated all reported instances, and in all cases examined to date, the difficulties were attributed to galling during installation or post-flight removal. To date, no evidence of coldwelding was found. Correct selection of materials and lubricants as well as proper mechanical procedures is essential to ensure successful on-orbit or post-flight installation and removal of hardware.

  16. Radon mitigation in cold climates at Kitigan Zibi Anishinabeg.

    PubMed

    Brossard, Mathieu; Ottawa, Céline Brazeau; Falcomer, Renato; Whyte, Jeff

    2015-02-01

    Available radon mitigation results were gathered for 85 houses mainly by installing sub-slab depressurization systems (SSDS) with two types of discharge and fan locations: Above ground level discharge with the fan located in the basement (AGL) or above roof line discharge with the fan located in the attic (ARL). A comparative analysis was made of mitigation efficiency and of exhaust icing. Results show that both SSDS scenarios reduced radon levels similarly. The results of SSDS with AGL show that a sealed radon fan having proper fittings and sealed piping was able to reduce the radon to acceptable levels, and that these installations were less subject to obstructive icing of the exhaust in cold climates.

  17. Effects of long-term exposure on LDEF fastener assemblies

    NASA Technical Reports Server (NTRS)

    Spear, Steve; Dursch, Harry

    1992-01-01

    This presentation summarizes the Systems Special Investigations Group (SIG) findings from testing and analysis of fastener assemblies used on the Long Duration Exposure Facility (LDEF) structure, the tray mounting clamps, and by the various experimenters. The LDEF deintegration team and several experimenters noted severe fastener damage and hardware removal difficulties during post-flight activities. The System SIG has investigated all reported instances, and in all cases examined to date, the difficulties were attributed to galling during installation or post-flight removal. To date, no evidence of coldwelding was found. Correct selection of materials and lubricants as well as proper mechanical procedures is essential to ensure successful on-orbit or post-flight installation and removal of hardware.

  18. Gas Fills | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  19. Understanding Windows | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  20. Books & Publications | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  1. Efficient Windows Collaborative | Home

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  2. Resources | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  3. Provide Views | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  4. Links | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  5. Reducing Condensation | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  6. Reduced Fading | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  7. EWC Membership | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  8. Visible Transmittance | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  9. EWC Members | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  10. Financing & Incentives | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  11. Evaluation of fire-safety programs that use 10-year smoke alarms.

    PubMed

    Jackson, Mark; Wilson, Jonathan; Akoto, Judith; Dixon, Sherry; Jacobs, David E; Ballesteros, Michael F

    2010-10-01

    The Centers for Disease Control and Prevention began funding a Smoke Alarm Installation and Fire Safety Education (SAIFE) program in 1998. This program involves the installation of lithium-powered "10-year" smoke alarms in homes at high risk for fires and injuries. This study aimed to (1) determine among original SAIFE homes if the lithium-powered alarms were still present and functional 8-10 years after installation and (2) understand factors related to smoke alarm presence and functionality. Data on a total of 384 homes and 601 smoke alarms in five states were collected and analyzed. Only one-third of alarms were still functional; 37% of installed alarms were missing; and 30% of alarms were present, but not functioning. Alarms were less likely to be functioning if they were installed in the kitchen and if homes had a different resident at follow-up. Of the 351 alarms that were present and had a battery at the time of the evaluation, only 21% contained lithium-powered batteries. Of these, 78% were still functioning. Programs that install lithium-powered alarms should use units that have sealed-in batteries and "hush" buttons. Additionally, education should be given on smoke alarm maintenance that includes a message that batteries in these alarms should not be replaced. Lithium-powered smoke alarms should last up to 10 years if maintained properly.

  12. 46 CFR 170.270 - Door design, operation, installation, and testing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Door design, operation, installation, and testing. 170..., operation, installation, and testing. (a) Each Class 1 door must have a quick action closing device... the welding process so that the door frame is not distorted. (e) For each watertight door which is in...

  13. Solar energy system installed at Mount Rushmore National Visitor Center in Keystone, South Dakota

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The design and installation of the solar energy system installed at the Mount Rushmore Visitor Center is described. The system was designed to furnish about 45 percent of the heating for the total facility and about 53 percent partial cooling for the 2000 square foot observatory.

  14. Gasfitter: Apprenticeship Course Outline. Apprenticeship and Industry Training. 0806.2

    ERIC Educational Resources Information Center

    Alberta Advanced Education and Technology, 2006

    2006-01-01

    The graduate of the Gasfitter apprenticeship program is a certified journeyperson who will be able to: (1) apply the standards and regulations of natural and LP gas in order to provide the maximum of safety; (2) know the characteristics and proper use of each product; (3) be able to install and maintain pipe systems, appliances and equipment using…

  15. 30 CFR 250.1722 - If I install a subsea protective device, what requirements must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... protective covering, the casing stub or mud line suspension equipment, or the trawl, and a discussion of any... subsea wellheads, casing stubs, mud line suspensions, or other obstructions in water depths less than 300... reveals that a casing stub or mud line suspension is no longer properly protected, or if the trawl does...

  16. Maintaining Health and Safety at Workplace: Employee and Employer's Role in Ensuring a Safe Working Environment

    ERIC Educational Resources Information Center

    Jonathan, Grace Katunge; Mbogo, Rosemary Wahu

    2016-01-01

    The concern for health and safety is legitimate in every context of human enterprise. In schools, for teaching staff's safety to be guaranteed, the equipment available should be properly maintained and installation for nonexistent ones done according to the health and safety policies. With a focus on Mbooni West district, this paper reports the…

  17. Design, development, and installation of a two-node, color video-teleconferencing system for the US Navy

    NASA Astrophysics Data System (ADS)

    Vest, K. F.; Jones, P.; French, D.; Sachs, H.; Clements, F.

    1985-11-01

    This report discusses the design of a two-node, color Video-Teleconferencing System for the System for the U.S. Navy and its installation at sites in Suitland, Maryland, and Pearl Harbor. It details the development of the audio, video, and fast-facsimile parts of the system; integration of the system into the communications network; design of a teleconference room; and installation of the system.

  18. Gas analysis system for the Eight Foot High Temperature Tunnel

    NASA Technical Reports Server (NTRS)

    Leighty, Bradley D.; Davis, Patricia P.; Upchurch, Billy T.; Puster, Richard L.

    1992-01-01

    This paper describes the development of a gas collection and analysis system that is to be installed in the Eight-Foot High Temperature Tunnel (8' HTT) at NASA's Langley Research Center. This system will be used to analyze the test gas medium that results after burning a methane-air mixture to achieve the proper tunnel test parameters. The system consists of a sampling rake, a gas sample storage array, and a gas chromatographic system. Gas samples will be analyzed after each run to assure that proper combustion takes place in the tunnel resulting in a correctly balanced composition of the test gas medium. The proper ratio of gas species is critically necessary in order for the proper operation and testing of scramjet engines in the tunnel. After a variety of methane-air burn conditions have been analyzed, additional oxygen will be introduced into the combusted gas and the enriched test gas medium analyzed. The pre/post enrichment sets of data will be compared to verify that the gas species of the test gas medium is correctly balanced for testing of air-breathing engines.

  19. Benefits of Efficient Windows | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  20. Increased Light & View | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  1. Windows for New Construction | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  2. Performance Standards for Windows | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  3. Window Selection Tool | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  4. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  5. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  6. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  7. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  8. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  9. Air Leakage (AL) | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  10. State Fact Sheets | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  11. Fact Sheets & Publications | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  12. Condensation Resistance (CR) | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  13. Assessing Window Replacement Options | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  14. National Fenestration Rating Council (NFRC) | Efficient Windows

    Science.gov Websites

    Collaborative Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring

  15. Low Conductance Spacers | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  16. Energy & Cost Savings | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  17. U-Factor (U-value) | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  18. 30 CFR 285.710 - When conducting onsite installation inspections, what must the CVA or project engineer do?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Facility Design, Fabrication, and..., survey, or check, the installation items required by this section. (a) The CVA or project engineer must... according to the Facility Design Report and the Fabrication and Installation Report. (b) For a fixed or...

  19. 30 CFR 285.700 - What reports must I submit to MMS before installing facilities described in my approved SAP, COP...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Facility Design, Fabrication, and Installation Reports... (§ 285.651): (1) A Facility Design Report; and (2) A Fabrication and Installation Report. (b) You may...

  20. 75 FR 56520 - Information on Surplus Land at a Military Installation Designated for Disposal: NASJRB Willow...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-16

    ... DEPARTMENT OF DEFENSE Department of the Navy Information on Surplus Land at a Military Installation Designated for Disposal: NASJRB Willow Grove, PA AGENCY: Department of the Navy, DoD. ACTION... facilities at this installation were declared excess to the Department of Navy (DoN) and made available to...

  1. Solar heating and cooling system design and development

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The design and development of marketable solar heating and cooling systems for single family and commercial applications is described. The delivery, installation, and monitoring of the prototype systems are discussed. Seven operational test sites are discussed in terms of system performance. Problems encountered with equipment and installation were usually due to lack of skills required for solar system installation.

  2. Selection Process for New Windows | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  3. Selection Process for Replacement Windows | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  4. Solar Heat Gain Coefficient (SHGC) | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  5. The Commander’s Emergency Response Program: A Model for Future Implementation

    DTIC Science & Technology

    2010-04-07

    unintended Effects. The INVEST-E methodology serves as a tool for commanders and their designated practitioners to properly select projects, increasing...for commanders and their designated practitioners to properly select projects, increasing the effectiveness of CERP funds. 4 TABLE OF...and unintended Effects. The INVEST-E methodology serves as a tool for commanders and their designated practitioners to properly select projects

  6. 30 CFR 585.701 - What must I include in my Facility Design Report?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... design or installation, e.g., oceanographic and soil reports including the results of the surveys... 30 Mineral Resources 2 2014-07-01 2014-07-01 false What must I include in my Facility Design... Facility Design, Fabrication, and Installation Reports § 585.701 What must I include in my Facility Design...

  7. 30 CFR 585.701 - What must I include in my Facility Design Report?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... design or installation, e.g., oceanographic and soil reports including the results of the surveys... 30 Mineral Resources 2 2013-07-01 2013-07-01 false What must I include in my Facility Design... Facility Design, Fabrication, and Installation Reports § 585.701 What must I include in my Facility Design...

  8. 30 CFR 585.701 - What must I include in my Facility Design Report?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... design or installation, e.g., oceanographic and soil reports including the results of the surveys... 30 Mineral Resources 2 2012-07-01 2012-07-01 false What must I include in my Facility Design... Facility Design, Fabrication, and Installation Reports § 585.701 What must I include in my Facility Design...

  9. Installation of TVC Actuators in a Two Axis Inertial Load Simulator Test Stand

    NASA Technical Reports Server (NTRS)

    Dziubanek, Adam

    2013-01-01

    This paper is about the installation of Space Shuttle Main Engines (SSME) actuators in the new Two Axis Inertial Load Simulator (ILS) at MSFC. The new test stand will support the core stage of the Space Launch System (SLS). Because of the unique geometry of the new test stand standard actuator installation procedures will not work. I have been asked to develop a design on how to install the actuators into the new test stand. After speaking with the engineers and technicians I have created a possible design solution. Using Pro Engineer design software and running my own stress calculations I have proven my design is feasible. I have learned how to calculate the stresses my design will see from this task. From the calculations I have learned I have over built the apparatus. I have also expanded my knowledge of Pro Engineer and was able to create a model of my idea.

  10. Hydrogen and Oxygen Gas Monitoring System Design and Operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee C. Cadwallader; Kevin G. DeWall; J. Stephen Herring

    2007-06-01

    This paper describes pertinent design practices of selecting types of monitors, monitor unit placement, setpoint selection, and maintenance considerations for gas monitors. While hydrogen gas monitors and enriched oxygen atmosphere monitors as they would be needed for hydrogen production experiments are the primary focus of this paper, monitors for carbon monoxide and carbon dioxide are also discussed. The experiences of designing, installing, and calibrating gas monitors for a laboratory where experiments in support of the DOE Nuclear Hydrogen Initiative (NHI) are described along with codes, standards, and regulations for these monitors. Information from the literature about best operating practices ismore » also presented. The NHI program has two types of activities. The first, near-term activity is laboratory and pilot-plant experimentation with different processes in the kilogram per day scale to select the most promising types of processes for future applications of hydrogen production. Prudent design calls for indoor gas monitors to sense any hydrogen leaks within these laboratory rooms. The second, longer-term activity is the prototype, or large-scale plants to produce tons of hydrogen per day. These large, outdoor production plants will require area (or “fencepost”) monitoring of hydrogen gas leaks. Some processes will have oxygen production with hydrogen production, and any oxygen releases are also safety concerns since oxygen gas is the strongest oxidizer. Monitoring of these gases is important for personnel safety of both indoor and outdoor experiments. There is some guidance available about proper placement of monitors. The fixed point, stationary monitor can only function if the intruding gas contacts the monitor. Therefore, monitor placement is vital to proper monitoring of the room or area. Factors in sensor location selection include: indoor or outdoor site, the location and nature of potential vapor/gas sources, chemical and physical data of the gases or vapors, liquids with volatility need sensors near the potential sources of release, nature and concentration of gas releases, natural and mechanical ventilation, detector installation locations not vulnerable to mechanical or water damage from normal operations, and locations that lend themselves to convenient maintenance and calibration. The guidance also states that sensors should be located in all areas where hazardous accumulations of gas may occur. Such areas might not be close to release points but might be areas with restricted air movement. Heavier than air gases are likely to accumulate in pits, trenches, drains, and other low areas. Lighter than air gases are more likely to accumulate in overhead spaces, above drop ceilings, etc. In general, sensors should be located close to any potential sources of major release of gas. The paper gives data on monitor sensitivity and expected lifetimes to support the monitor selection process. Proper selection of indoor and outdoor locations for monitors is described, accounting for the vapor densities of hydrogen and oxygen. The latest information on monitor alarm setpoint selection is presented. Typically, monitors require recalibration at least every six months, or more frequently for inhospitable locations, so ready access to the monitors is an important issue to consider in monitor siting. Gas monitors, depending on their type, can be susceptible to blockages of the detector element (i.e., dus« less

  11. Establishing a design procedure for buried steel-reinforced high-density polyethylene pipes : a field study, [technical summary].

    DOT National Transportation Integrated Search

    2015-11-01

    Several national standards and specification have been developed for design, installation, : and materials for precast concrete pipe, corrugated metal pipe, and HDPE pipes. However, : no national accepted installation standard or design method is ava...

  12. 29 CFR 1910.306 - Specific purpose equipment and installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and multicar installations. On single-car and multicar installations, equipment receiving electrical... ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.306 Specific purpose equipment and installations. (a) Electric signs and...

  13. 29 CFR 1910.306 - Specific purpose equipment and installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and multicar installations. On single-car and multicar installations, equipment receiving electrical... ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.306 Specific purpose equipment and installations. (a) Electric signs and...

  14. 29 CFR 1910.306 - Specific purpose equipment and installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and multicar installations. On single-car and multicar installations, equipment receiving electrical... ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.306 Specific purpose equipment and installations. (a) Electric signs and...

  15. Design and implementation of the ESL compact range underhung bridge crane

    NASA Technical Reports Server (NTRS)

    Shamansky, H. T.; Dominek, A. K.; Burnside, W. D.

    1987-01-01

    As the indoor compact range technology has continued to increase, the need to handle larger and heavier targets has also increased. This need for target lifting and handling prompted the feasibility study of the use of an underhung bridge crane to be installed in the ESL (ElectroScience Laboratory, Ohio State University) compact range. This report documents both the design of the underhung bridge crane that was installed and the implementation of the design in the actual installation of the crane.

  16. Fort Knox, KY Containment Berm Unit Installation

    DTIC Science & Technology

    2013-02-01

    There is interest from the range community in establishing a sustainable, closed loop small arms firing range (SAFR) bullet impact system or Containment... system . The metals from the bullets will be retained, stabilized, in the berm material with the addition of proper amendments. Following sufficient...replaced or placed back in the connex. This provides a closed loop containment system for sustainable range training purposes. The Containment Berm

  17. Implementing Network Video for Traditional Security and Innovative Applications: Best Practices and Uses for Network Video in K-12 Schools

    ERIC Educational Resources Information Center

    Wren, Andrew

    2008-01-01

    Administrators are constantly seeking ways to cost-effectively and adequately increase security and improve efficiency in K-12 schools. While video is not a new tool to schools, the shift from analog to network technology has increased the accessibility and usability in a variety of applications. Properly installed and used, video is a powerful…

  18. Development by Design: Mitigating Wind Development's Impacts on Wildlife in Kansas

    PubMed Central

    Obermeyer, Brian; Manes, Robert; Kiesecker, Joseph; Fargione, Joseph; Sochi, Kei

    2011-01-01

    Wind energy, if improperly sited, can impact wildlife through direct mortality and habitat loss and fragmentation, in contrast to its environmental benefits in the areas of greenhouse gas, air quality, and water quality. Fortunately, risks to wildlife from wind energy may be alleviated through proper siting and mitigation offsets. Here we identify areas in Kansas where wind development is incompatible with conservation, areas where wind development may proceed but with compensatory mitigation for impacts, and areas where development could proceed without the need for compensatory mitigation. We demonstrate that approximately 10.3 million ha in Kansas (48 percent of the state) has the potential to provide 478 GW of installed capacity while still meeting conservation goals. Of this total, approximately 2.7 million ha would require no compensatory mitigation and could produce up to 125 GW of installed capacity. This is 1,648 percent higher than the level of wind development needed in Kansas by 2030 if the United States is to get 20 percent of its electricity from wind. Projects that avoid and offset impacts consistent with this analysis could be awarded “Green Certification.” Certification may help to expand and sustain the wind industry by facilitating the completion of individual projects sited to avoid sensitive areas and protecting the industry's reputation as an ecologically friendly source of electricity. PMID:22046333

  19. The influence of maintenance quality of hemodialysis machines on hemodialysis efficiency.

    PubMed

    Azar, Ahmad Taher

    2009-01-01

    Several studies suggest that there is a correlation between dose of dialysis and machine maintenance. However, in spite of the current practice, there are conflicting reports regarding the relationship between dose of dialysis or patient outcome, and machine maintenance. In order to evaluate the impact of hemodialysis machine maintenance on dialysis adequacy Kt/V and session performance, data were processed on 134 patients on 3-times-per-week dialysis regimens by dividing the patients into four groups and also dividing the hemodialysis machines into four groups according to their year of installation. The equilibrated dialysis dose eq Kt/V, urea reduction ratio (URR) and the overall equipment effectiveness (OEE) were calculated in each group to show the effect hemodialysis machine efficiency on the overall session performance. The average working time per machine per month was 270 hours. The cumulative number of hours according to the year of installation was: 26,122 hours for machines installed in 1998; 21,596 hours for machines installed in 1999, 8362 hours for those installed in 2003 and 2486 hours for those installed in 2005. The mean time between failures (MTBF) was 1.8, 2.1, 4.2 and 6 months between failures for machines installed in 1999, 1998, 2003 and 2005, respectively. Statistical analysis demonstrated that the dialysis dose eq Kt/V and URR were increased as the overall equipment effectiveness (OEE) increases with regular maintenance procedures. Maintenance has become one of the most expedient approaches to guarantee high machine dependability. The efficiency of dialysis machine is relevant in assuring a proper dialysis adequacy.

  20. USGS reservoir and lake gage network: Elevation and volumetric contents data, and their uses

    USGS Publications Warehouse

    Kroska, Anita C.

    2014-01-01

    In December of 2013, the U.S. Geological Survey (USGS) marked the 125th anniversary of the installation of its first official water level and streamflow gage, on the Rio Grande at Embudo, New Mexico. The gage was installed because it was recognized that water data were important to expanding irrigation needs. The USGS is a federal agency that provides nationally consistent and unbiased surface-water elevation and streamflow data at more than 10,000 gaging locations in the United States, about 330 of which are lakes and reservoirs (referred to hereafter as lakes) (Figure 1). The job of quantifying water resources, whether lakes, streams, or aquifers, is fundamental to proper water management and conservation of resources.

  1. SHARK-NIR: from K-band to a key instrument, a status update

    NASA Astrophysics Data System (ADS)

    Farinato, Jacopo; Bacciotti, Francesca; Baffa, Carlo; Baruffolo, Andrea; Bergomi, Maria; Bongiorno, Angela; Carbonaro, Luca; Carolo, Elena; Carlotti, Alexis; Centrone, Mauro; Close, Laird; De Pascale, Marco; Dima, Marco; D'Orazi, Valentina; Esposito, Simone; Fantinel, Daniela; Farisato, Giancarlo; Gaessler, Wolfgang; Giallongo, Emanuele; Greggio, Davide; Guyon, Olivier; Hinz, Philip; Lisi, Franco; Magrin, Demetrio; Marafatto, Luca; Mohr, Lars; Montoya, Manny; Pedichini, Fernando; Pinna, Enrico; Puglisi, Alfio; Ragazzoni, Roberto; Salasnich, Bernardo; Stangalini, Marco; Vassallo, Daniele; Verinaud, Christophe; Viotto, Valentina

    2016-07-01

    SHARK-NIR channel is one of the two coronagraphic instruments proposed for the Large Binocular Telescope, in the framework of the call for second generation instruments, issued in 2014. Together with the SHARK-VIS channel, it will offer a few observing modes (direct imaging, coronagraphic imaging and coronagraphic low resolution spectroscopy) covering a wide wavelength domain, going from 0.5μm to 1.7μm. Initially proposed as an instrument covering also the K-band, the current design foresees a camera working from Y to H bands, exploiting in this way the synergy with other LBT instruments such as LBTI, which is actually covering wavelengths greater than L' band, and it will be soon upgraded to work also in K band. SHARK-NIR has been undergoing the conceptual design review at the end of 2015 and it has been approved to proceed to the final design phase, receiving the green light for successive construction and installation at LBT. The current design is significantly more flexible than the previous one, having an additional intermediate pupil plane that will allow the usage of coronagraphic techniques very efficient in term of contrast and vicinity to the star, increasing the instrument coronagraphic performance. The latter is necessary to properly exploit the search of giant exo-planets, which is the main science case and the driver for the technical choices of SHARK-NIR. We also emphasize that the LBT AO SOUL upgrade will further improve the AO performance, making possible to extend the exo-planet search to target fainter than normally achieved by other 8-m class telescopes, and opening in this way to other very interesting scientific scenarios, such as the characterization of AGN and Quasars (normally too faint to be observed) and increasing considerably the sample of disks and jets to be studied. Finally, we emphasize that SHARK-NIR will offer XAO direct imaging capability on a FoV of about 15"x15", and a simple coronagraphic spectroscopic mode offering spectral resolution ranging from few hundreds to few thousands. This article presents the current instrument design, together with the milestones for its installation at LBT.

  2. Design data brochure: Solar hot air heater

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The design, installation, performance, and application of a solar hot air heater for residential, commercial and industrial use is reported. The system has been installed at the Concho Indian School in El Reno, Oklahoma.

  3. 78 FR 74146 - Agency Information Collection Activities; Submission for Office of Management and Budget Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-10

    ... for, the manufacture, preproduction design validation (including a process to assess the performance... requirements governing the design, manufacture, packing, labeling, storage, installation, and servicing of all... for Quality Assurance in Design/Development, Production, Installation, and Servicing.'' The CGMP/QS...

  4. 75 FR 63834 - Agency Information Collection Activities; Submission for Office of Management and Budget Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-18

    ... facilities and controls used for, the manufacture, preproduction design validation (including a process to... requirements governing the design, manufacture, packing, labeling, storage, installation, and servicing of all... Model for Quality Assurance in Design/Development, Production, Installation, and Servicing.'' The CGMP...

  5. 24 CFR 3282.12 - Excluded structures-modular homes.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... is designed only for erection or installation on a site-built permanent foundation; (i) A structure... structure, including but not limited to designs, drawings, and installation or erection instructions...) Capable of transferring all design loads imposed by or upon the structure into soil or bedrock without...

  6. 24 CFR 3282.12 - Excluded structures-modular homes.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... is designed only for erection or installation on a site-built permanent foundation; (i) A structure... structure, including but not limited to designs, drawings, and installation or erection instructions...) Capable of transferring all design loads imposed by or upon the structure into soil or bedrock without...

  7. 24 CFR 3282.12 - Excluded structures-modular homes.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... is designed only for erection or installation on a site-built permanent foundation; (i) A structure... structure, including but not limited to designs, drawings, and installation or erection instructions...) Capable of transferring all design loads imposed by or upon the structure into soil or bedrock without...

  8. 30 CFR 250.1628 - Design, installation, and operation of production systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... mechanical and electrical systems to be installed was approved by registered professional engineers. After... Installation of Offshore Production Platform Piping Systems; (3) Electrical system information including a plan... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as...

  9. Distribution System Reliability Analysis for Smart Grid Applications

    NASA Astrophysics Data System (ADS)

    Aljohani, Tawfiq Masad

    Reliability of power systems is a key aspect in modern power system planning, design, and operation. The ascendance of the smart grid concept has provided high hopes of developing an intelligent network that is capable of being a self-healing grid, offering the ability to overcome the interruption problems that face the utility and cost it tens of millions in repair and loss. To address its reliability concerns, the power utilities and interested parties have spent extensive amount of time and effort to analyze and study the reliability of the generation and transmission sectors of the power grid. Only recently has attention shifted to be focused on improving the reliability of the distribution network, the connection joint between the power providers and the consumers where most of the electricity problems occur. In this work, we will examine the effect of the smart grid applications in improving the reliability of the power distribution networks. The test system used in conducting this thesis is the IEEE 34 node test feeder, released in 2003 by the Distribution System Analysis Subcommittee of the IEEE Power Engineering Society. The objective is to analyze the feeder for the optimal placement of the automatic switching devices and quantify their proper installation based on the performance of the distribution system. The measures will be the changes in the reliability system indices including SAIDI, SAIFI, and EUE. The goal is to design and simulate the effect of the installation of the Distributed Generators (DGs) on the utility's distribution system and measure the potential improvement of its reliability. The software used in this work is DISREL, which is intelligent power distribution software that is developed by General Reliability Co.

  10. Repair, Evaluation, Maintenance, and Rehabilitation Research Program. Lubricants for Hydraulic Structures

    DTIC Science & Technology

    1989-08-01

    machinery design , precision machining, proper maintenance, and proper lubrication. Ordinarily, wear is thought of only in terms of abrasive wear occurring in...operate under this principle. However, the design must allow the plates to lift and tilt properly and provide sufficient area to lift the load. 38. Another...friction and wear to a minimum. Boundary Lubrication 42. Lubrication designed to protect against frictional effects when asperities meet is called

  11. Smart home in a box: usability study for a large scale self-installation of smart home technologies.

    PubMed

    Hu, Yang; Tilke, Dominique; Adams, Taylor; Crandall, Aaron S; Cook, Diane J; Schmitter-Edgecombe, Maureen

    2016-07-01

    This study evaluates the ability of users to self-install a smart home in a box (SHiB) intended for use by a senior population. SHiB is a ubiquitous system, developed by the Washington State University Center for Advanced Studies in Adaptive Systems (CASAS). Participants involved in this study are from the greater Palouse region of Washington State, and there are 13 participants in the study with an average age of 69.23. The SHiB package, which included several different types of components to collect and transmit sensor data, was given to participants to self-install. After installation of the SHiB, the participants were visited by researchers for a check of the installation. The researchers evaluated how well the sensors were installed and asked the resident questions about the installation process to help improve the SHiB design. The results indicate strengths and weaknesses of the SHiB design. Indoor motion tracking sensors are installed with high success rate, low installation success rate was found for door sensors and setting up the Internet server.

  12. Smart home in a box: usability study for a large scale self-installation of smart home technologies

    PubMed Central

    Hu, Yang; Tilke, Dominique; Adams, Taylor; Crandall, Aaron S.; Schmitter-Edgecombe, Maureen

    2017-01-01

    This study evaluates the ability of users to self-install a smart home in a box (SHiB) intended for use by a senior population. SHiB is a ubiquitous system, developed by the Washington State University Center for Advanced Studies in Adaptive Systems (CASAS). Participants involved in this study are from the greater Palouse region of Washington State, and there are 13 participants in the study with an average age of 69.23. The SHiB package, which included several different types of components to collect and transmit sensor data, was given to participants to self-install. After installation of the SHiB, the participants were visited by researchers for a check of the installation. The researchers evaluated how well the sensors were installed and asked the resident questions about the installation process to help improve the SHiB design. The results indicate strengths and weaknesses of the SHiB design. Indoor motion tracking sensors are installed with high success rate, low installation success rate was found for door sensors and setting up the Internet server. PMID:28936390

  13. Alternative design of pipe sleeve for liquid removal mechanism in mortar slab layer

    NASA Astrophysics Data System (ADS)

    Nazri, W. M. H. Wan; Anting, N.; Lim, A. J. M. S.; Prasetijo, J.; Shahidan, S.; Din, M. F. Md; Anuar, M. A. Mohd

    2017-11-01

    Porosity is one of the mortar’s characteristics that can cause problems, especially in the room space that used high amount of water, such as bathrooms. Waterproofing is one of the technology that normally used to minimize this problem which is preventing deep penetration of liquid water or moisture into underlying concrete layers. However, without the proper mechanism to remove liquid water and moisture from mortar system, waterproofing layer tends to be damaged after a long period of time by the static formation of liquid water and moisture at mortar layer. Thus, a solution has been proposed to drain out water that penetrated into the mortar layer. This paper introduces a new solution using a Modified Pipe Sleeve (MPS) that installed at the mortar layer. The MPS has been designed considering the percentage surface area of the pipe sleeve that having contact with mortar layer (2%, 4%, 6%, 8% and 10%) with angle of holes of 60°. Infiltration test and flow rate test have been conducted to identify the effectiveness of the MPS in order to drain out liquid water or moisture from the mortar layer. In this study shows that, MPS surface area 10%, angled 60°, function effectively as a water removal compared to other design.

  14. Design and Installation of Monitoring Wells Guidance

    EPA Pesticide Factsheets

    EPA Region 4 Science and Ecosystem Support Division (SESD) document, from Feb. 18, 2008, that describes procedures, methods, and considerations when designing and installing groundwater monitoring wells to be used for collection of groundwater samples.

  15. 76 FR 15798 - Special Conditions: Boeing 747-468, Installation of a Medical Lift

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... a novel or unusual design feature associated with the installation of a medical lift. The applicable airworthiness regulations do not contain adequate or appropriate safety standards for this design feature. These... airworthiness regulations do not contain adequate or appropriate safety standards for this design feature. Type...

  16. Saltwater intrusion in the surficial aquifer system of the Big Cypress Basin, southwest Florida, and a proposed plan for improved salinity monitoring

    USGS Publications Warehouse

    Prinos, Scott T.

    2013-01-01

    The installation of drainage canals, poorly cased wells, and water-supply withdrawals have led to saltwater intrusion in the primary water-use aquifers in southwest Florida. Increasing population and water use have exacerbated this problem. Installation of water-control structures, well-plugging projects, and regulation of water use have slowed saltwater intrusion, but the chloride concentration of samples from some of the monitoring wells in this area indicates that saltwater intrusion continues to occur. In addition, rising sea level could increase the rate and extent of saltwater intrusion. The existing saltwater intrusion monitoring network was examined and found to lack the necessary organization, spatial distribution, and design to properly evaluate saltwater intrusion. The most recent hydrogeologic framework of southwest Florida indicates that some wells may be open to multiple aquifers or have an incorrect aquifer designation. Some of the sampling methods being used could result in poor-quality data. Some older wells are badly corroded, obstructed, or damaged and may not yield useable samples. Saltwater in some of the canals is in close proximity to coastal well fields. In some instances, saltwater occasionally occurs upstream from coastal salinity control structures. These factors lead to an incomplete understanding of the extent and threat of saltwater intrusion in southwest Florida. A proposed plan to improve the saltwater intrusion monitoring network in the South Florida Water Management District’s Big Cypress Basin describes improvements in (1) network management, (2) quality assurance, (3) documentation, (4) training, and (5) data accessibility. The plan describes improvements to hydrostratigraphic and geospatial network coverage that can be accomplished using additional monitoring, surface geophysical surveys, and borehole geophysical logging. Sampling methods and improvements to monitoring well design are described in detail. Geochemical analyses that provide insights concerning the sources of saltwater in the aquifers are described. The requirement to abandon inactive wells is discussed.

  17. Space shuttle auxiliary propulsion system design study. Phase C and E report: Storable propellants, RCS/OMS/APU integration study

    NASA Technical Reports Server (NTRS)

    Anglim, D. D.; Bruns, A. E.; Perryman, D. C.; Wieland, D. L.

    1972-01-01

    Auxiliary propulsion concepts for application to the space shuttle are compared. Both monopropellant and bipropellant earth storable reaction control systems were evaluated. The fundamental concepts evaluated were: (1) monopropellant and bipropellant systems installed integrally within the vehicle, (2) fuel systems installed modularly in nose and wing tip pods, and (3) fuel systems installed modularly in nose and fuselage pods. Numerous design variations within these three concepts were evaluated. The system design analysis and methods for implementing each of the concepts are reported.

  18. Design and Verification of Space Station EVA-Operated Truss Attachment System

    NASA Technical Reports Server (NTRS)

    Katell, Gabriel

    2001-01-01

    This paper describes the design and verification of a system used to attach two segments of the International Space Station (ISS). This system was first used in space to mate the P6 and Z1 trusses together in December 2000, through a combination of robotic and extravehicular tasks. Features that provided capture, coarse alignment, and fine alignment during the berthing process are described. Attachment of this high value hardware was critical to the ISS's sequential assembly, necessitating the inclusion of backup design and operational features. Astronauts checked for the proper performance of the alignment and bolting features during on-orbit operations. During berthing, the system accommodates truss-to-truss relative displacements that are caused by manufacturing tolerances and on-orbit thermal gradients. After bolt installation, the truss interface becomes statically determinate with respect to in-plane shear loads and isolates attach bolts from bending moments. The approach used to estimate relative displacements and the means of accommodating them is explained. Confidence in system performance was achieved through a cost-effective collection of tests and analyses, including thermal, structural, vibration, misalignment, contact dynamics, underwater simulation, and full-scale functional testing. Design considerations that have potential application to other mechanisms include accommodating variations of friction coefficients in the on-orbit joints, wrench torque tolerances, joint preload, moving element clearances at temperature extremes, and bolt-nut torque reaction.

  19. 14 CFR 27.1301 - Function and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 27.1301 Section... AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Equipment General § 27.1301 Function and installation. Each item of installed equipment must— (a) Be of a kind and design appropriate to its intended function; (b...

  20. 14 CFR 25.1301 - Function and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 25.1301 Section... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment General § 25.1301 Function and installation. (a) Each item of installed equipment must— (1) Be of a kind and design appropriate to its intended function...

  1. 14 CFR 29.1301 - Function and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 29.1301 Section... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment General § 29.1301 Function and installation. Each item of installed equipment must— (a) Be of a kind and design appropriate to its intended function...

  2. 14 CFR 23.1301 - Function and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 23.1301 Section... Function and installation. Each item of installed equipment must— (a) Be of a kind and design appropriate to its intended function. (b) Be labeled as to its identification, function, or operating limitations...

  3. 14 CFR 31.71 - Function and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 31.71 Section 31... AIRWORTHINESS STANDARDS: MANNED FREE BALLOONS Equipment § 31.71 Function and installation. (a) Each item of installed equipment must— (1) Be of a kind and design appropriate to its intended function; (2) Be...

  4. 24 CFR 3286.103 - DAPIA-approved installation instructions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... instructions for the home. (2) If the installation requires a design that is different from that provided by... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Certification of Installation in HUD... purchaser or lessee. (1) For each manufactured home sold or leased to a purchaser or lessee, the retailer...

  5. 46 CFR 58.10-15 - Gas turbine installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine installations. (a) Standards. The design, construction, workmanship and tests of gas turbines and their associated... 46 Shipping 2 2010-10-01 2010-10-01 false Gas turbine installations. 58.10-15 Section 58.10-15...

  6. 46 CFR 58.10-15 - Gas turbine installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine installations. (a) Standards. The design, construction, workmanship and tests of gas turbines and their associated... 46 Shipping 2 2011-10-01 2011-10-01 false Gas turbine installations. 58.10-15 Section 58.10-15...

  7. Aviation Environmental Design Tool (AEDT) : Version 2c service Pack 1 : installation guide.

    DOT National Transportation Integrated Search

    2016-12-01

    This document provides detailed instructions on how to install and run AEDT 2c Service Pack 1 (SP1). It is important to follow the installation instructions in the order listed below, as Microsoft SQL Server 2008 R2 is a prerequisite for AEDT. Instal...

  8. An Investigation of the Aerodynamics and Cooling of a Horizontally-Opposed Engine Installation

    NASA Technical Reports Server (NTRS)

    Miley, S. J.

    1977-01-01

    A research program to investigate the aerodynamics of reciprocating aircraft engine cooling installations is discussed. Current results from a flight test program are presented concerning installation flow measurement methods. The influence of different inlet designs on installation cooling effectiveness and efficiency are described.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olsen, Tim; Preus, Robert

    Site assessment for small wind energy systems is one of the key factors in the successful installation, operation, and performance of a small wind turbine. A proper site assessment is a difficult process that includes wind resource assessment and the evaluation of site characteristics. These guidelines address many of the relevant parts of a site assessment with an emphasis on wind resource assessment, using methods other than on-site data collection and creating a small wind site assessment report.

  10. Information Management: Telecommunications: Record Communications and the Privacy Communications System

    DTIC Science & Technology

    1990-09-04

    commanders of major Army commands (MACOMs) will— (1) Disseminate a CIC’s specific meaning to all concerned agen- cies, offices, installations, data...be by electrical or non- electrical means and assigning the proper precedence. Where mail or courier is indicated, the writer must ensure that the...selected means are used for delivery. (7) Obtaining needed staff coordination. (8) Handcarrying priority and higher precedence messages during the staff

  11. A leading edge heating array and a flat surface heating array - operation, maintenance and repair manual

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A general description of the leading edge/flat surface heating array is presented along with its components, assembly instructions, installation instructions, operation procedures, maintenance instructions, repair procedures, schematics, spare parts lists, engineering drawings of the array, and functional acceptance test log sheets. The proper replacement of components, correct torque values, step-by-step maintenance instructions, and pretest checkouts are described.

  12. Improving the installation of renewable heating technology in UK social housing properties through user centred design.

    PubMed

    Moore, Natalie; Haines, Victoria; Lilley, Debra

    2015-11-01

    Social housing organisations are increasingly installing renewable energy technologies, particularly for the provision of heating and hot water. To meet carbon reduction targets, uptake and installation must allow occupants to use the technology effectively. This paper describes research which investigated the service of installing heat pumps into UK social housing properties, from both landlords' and tenants' experiences. Adopting a user centred design approach, the research was in three phases: an exploration study to investigate landlords' and tenants' experiences of heat pump installation and use; refinement and development of the requirements for improved service delivery, primarily technology introduction and control; and the development and initial evaluation of an information leaflet as a key touchpoint in the service delivery. Recommendations for improved service delivery, to enable heat pumps to be accepted and used more effectively, are presented, as well as reflection on the process of applying user centred design in this context. In a relatively immature area of industry, installations to date have been heavily focused on technical aspects. This paper provides an insight into the human aspects of the service delivery of heat pumps in social housing, providing designers and social housing landlords with insight about how to improve the service.

  13. Improving the installation of renewable heating technology in UK social housing properties through user centred design

    PubMed Central

    Moore, Natalie; Lilley, Debra

    2015-01-01

    Social housing organisations are increasingly installing renewable energy technologies, particularly for the provision of heating and hot water. To meet carbon reduction targets, uptake and installation must allow occupants to use the technology effectively. This paper describes research which investigated the service of installing heat pumps into UK social housing properties, from both landlords’ and tenants’ experiences. Adopting a user centred design approach, the research was in three phases: an exploration study to investigate landlords’ and tenants’ experiences of heat pump installation and use; refinement and development of the requirements for improved service delivery, primarily technology introduction and control; and the development and initial evaluation of an information leaflet as a key touchpoint in the service delivery. Recommendations for improved service delivery, to enable heat pumps to be accepted and used more effectively, are presented, as well as reflection on the process of applying user centred design in this context. In a relatively immature area of industry, installations to date have been heavily focused on technical aspects. This paper provides an insight into the human aspects of the service delivery of heat pumps in social housing, providing designers and social housing landlords with insight about how to improve the service. PMID:26539060

  14. Use of Computational Fluid Dynamics for improving freeze-dryers design and process understanding. Part 2: Condenser duct and valve modelling.

    PubMed

    Marchisio, Daniele L; Galan, Miquel; Barresi, Antonello A

    2018-05-05

    This manuscript shows how computational models, mainly based on Computational Fluid Dynamics (CFD), can be used to simulate different parts of an industrial freeze-drying equipment and to properly design them; in particular in this part the duct connecting the chamber with the condenser, with its valves, is considered, while the chamber design and its effect on drying kinetics have been investigated in Part 1. Such an approach allows a much deeper process understanding and assessment of the critical aspects of lyophilisation. This methodology will be demonstrated on freeze-drying equipment of different sizes, investigating influence of valve type (butterfly and mushroom) and shape on duct conductance and critical flow conditions. The role of the inlet and boundary conditions considered has been assessed, also by modelling the whole apparatus including chamber and condenser, and the influence of the duct diameter has been discussed; the results show a little dependence of the relationship between critical mass flux and chamber pressure on the duct size. Results concerning the fluid dynamics of a simple disk valve, a profiled butterfly valve and a mushroom valve installed in a medium size horizontal condenser are presented. Also in these cases the maximum allowable flow when sonic flow conditions are reached can be described by a correlation similar to that found valid for empty ducts; for the mushroom valve the parameters are dependent on the valve opening length. The possibility to use the equivalent length concept, and to extend the validity of the results obtained for empty ducts will be also discussed. Finally the presence of the inert gas modifies the conductance of the duct, reducing the maximum flow rate of water that can be removed through it before the flow is choked; this also requires a proper over-sizing of the duct (or duct-butterfly valve system). Copyright © 2018. Published by Elsevier B.V.

  15. Testing an Open Source installation and server provisioning tool for the INFN CNAF Tierl Storage system

    NASA Astrophysics Data System (ADS)

    Pezzi, M.; Favaro, M.; Gregori, D.; Ricci, P. P.; Sapunenko, V.

    2014-06-01

    In large computing centers, such as the INFN CNAF Tier1 [1], is essential to be able to configure all the machines, depending on use, in an automated way. For several years at the Tier1 has been used Quattor[2], a server provisioning tool, which is currently used in production. Nevertheless we have recently started a comparison study involving other tools able to provide specific server installation and configuration features and also offer a proper full customizable solution as an alternative to Quattor. Our choice at the moment fell on integration between two tools: Cobbler [3] for the installation phase and Puppet [4] for the server provisioning and management operation. The tool should provide the following properties in order to replicate and gradually improve the current system features: implement a system check for storage specific constraints such as kernel modules black list at boot time to avoid undesired SAN (Storage Area Network) access during disk partitioning; a simple and effective mechanism for kernel upgrade and downgrade; the ability of setting package provider using yum, rpm or apt; easy to use Virtual Machine installation support including bonding and specific Ethernet configuration; scalability for managing thousands of nodes and parallel installations. This paper describes the results of the comparison and the tests carried out to verify the requirements and the new system suitability in the INFN-T1 environment.

  16. Aerodynamics of heat exchangers for high-altitude aircraft

    NASA Technical Reports Server (NTRS)

    Drela, Mark

    1996-01-01

    Reduction of convective beat transfer with altitude dictates unusually large beat exchangers for piston- engined high-altitude aircraft The relatively large aircraft drag fraction associated with cooling at high altitudes makes the efficient design of the entire heat exchanger installation an essential part of the aircraft's aerodynamic design. The parameters that directly influence cooling drag are developed in the context of high-altitude flight Candidate wing airfoils that incorporate heat exchangers are examined. Such integrated wing-airfoil/heat-exchanger installations appear to be attractive alternatives to isolated heat.exchanger installations. Examples are drawn from integrated installations on existing or planned high-altitude aircraft.

  17. 46 CFR 111.05-3 - Design, construction, and installation; general.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Design, construction, and installation; general. 111.05-3 Section 111.05-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-3 Design, construction, and...

  18. 46 CFR 111.05-3 - Design, construction, and installation; general.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Design, construction, and installation; general. 111.05-3 Section 111.05-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-3 Design, construction, and...

  19. [Practical guideline for the management of adverse events associated with BCG installations].

    PubMed

    Rodríguez, Fernando; Palou, Juan; Martínez, R; Rodríguez, O; Rosales, A; Huguet, Jorge; Villavicencio, Humberto

    2008-06-01

    Morbidity secondary to intravesical Bacillus Calmette-Guèrin (BCG) may present both locally and systemically. Most patients suffer a self-limited irritative voiding syndrome. Often, there are not unified criteria for the management of BCG side effects. After treating more than 500 patients with BCG we developed a practical guideline for the management of its morbidity. We present clearly and schematically the practice guideline we follow in our Center when the patient presents symptoms and morbidity secondary to BCG intravesical installations. We analyze and describe, following the literature and our own experience, the management of adverse events experienced by patients treated with intravesical BCG, since the initial implementation of the protocol for its indication in patients with high risk non-muscle invasive bladder tumors and/or CIS. Irritative voiding symptoms are among the most frequent symptoms, generally self-limited; but if they persist (> 48 hours) will have the urologist treat them depending on intensity and duration. Macroscopic hematuria is not unfrequent and diminishes with an expectant approach and water intake. But, it may also be a urinary tract infection or residual tumor. A febrile syndrome, if present, is usually self-limited to the first 24-48 hours and below 38.5 degrees C without general status affectation. In cases of persistence and/or sepsis, tuberculostatic treatment and/or corticoids should be started. Other clinical pictures may appear, such as orchyoepididymitis, arthritis, etc. Proper diagnosis and treatment of adverse events after BCG therapy are basic to allow intravesical immunotherapy be properly prescribed and managed by urologists, enabling a proper treatment of patients and avoiding the possibility of more severe complications.

  20. Low-speed wind tunnel investigation of the static stability and control characteristics of an advanced turboprop configuration with the propellers placed over the tail. M.S. Thesis

    NASA Technical Reports Server (NTRS)

    Rhodes, Graham Scott

    1990-01-01

    An exploratory wind tunnel investigation was performed in the 30 x 60 foot wind tunnel to determine the low speed static stability and control characteristics into the deep stall regime of an advanced turboprop aircraft with the propellers located over the horizontal tail. By this arrangement, the horizontal tail could potentially provide acoustic shielding to reduce the high community noise caused by the propeller blades. The current configuration was a generic turboprop model equipped with 1 foot diameter single rotating eight bladed propellers that were designed for efficient cruise operation at a Mach number of 0.8. The data presented is static force data. The effects of power on the configuration characteristics were generally favorable. An arrangement with the propellers rotating with the outboard blades moving down was found to have significantly higher installed thrust than an arrangement with the propellers rotating with the inboard blades moving down. The primary unfavorable effect was a large pitch trim change which occurred with power, but the trim change could be minimized with a proper configuration design.

  1. Solar Energy Installers Curriculum Guide. Final Report, September 18, 1980-August 15, 1981.

    ERIC Educational Resources Information Center

    Seaman, George B., Sr.

    This publication is a curriculum guide for the installation of solar equipment. It is divided into the three major areas of general knowledge, technical design, and installation/maintenance. Associated is a list of relevant and prerequisite competencies identified as appropriate toward student interest groups of technician, installer,…

  2. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  3. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  4. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  5. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  6. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  7. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Specifications for the Design... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for... Coast Guard for clarity. 1Purpose The purpose of these Specifications is to provide specific design...

  8. System design package for a solar heating and cooling system installed at Akron, Ohio

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Information used to evaluate the design of a solar heating, cooling, and domestic hot water system is given. A conventional heat pump provides summer cooling items as the design data brochure, system performance specification, system hazard analysis, spare parts list, and detailed design drawings. A solar system is installed in a single-family dwelling at Akron, Ohio, and at Duffield, Virginia.

  9. Fitting modular reconnaissance systems into modern high-performance aircraft

    NASA Astrophysics Data System (ADS)

    Stroot, Jacquelyn R.; Pingel, Leslie L.

    1990-11-01

    The installation of the Advanced Tactical Air Reconnaissance System (ATARS) in the F/A-18D(RC) presented a complex set of design challenges. At the time of the F/A-18D(RC) ATARS option exercise, the design and development of the ATARS subsystems and the parameters of the F/A-18D(RC) were essentially fixed. ATARS is to be installed in the gun bay of the F/A-18D(RC), taking up no additional room, nor adding any more weight than what was removed. The F/A-18D(RC) installation solution required innovations in mounting, cooling, and fit techniques, which made constant trade study essential. The successful installation in the F/A-18D(RC) is the result of coupling fundamental design engineering with brainstorming and nonstandard approaches to every situation. ATARS is sponsored by the Aeronautical Systems Division, Wright-Patterson AFB, Ohio. The F/A-18D(RC) installation is being funded to the Air Force by the Naval Air Systems Command, Washington, D.C.

  10. Development of guidelines for the installation of marked crosswalks.

    DOT National Transportation Integrated Search

    2004-01-01

    The Manual on Uniform Traffic Control Devices (MUTCD) provides little guidance on the installation of marked crosswalks, especially at locations other than intersections, i.e., mid-block locations. Crosswalks have typically been installed and designe...

  11. 30 CFR 817.151 - Primary roads.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the regulatory authority; (2) Drainage pipes and culverts shall be installed as designed, and... and embankment; (4) Culverts shall be installed and maintained to sustain the vertical soil pressure... crossings shall be made using bridges, culverts, low-water crossings, or other structures designed...

  12. 30 CFR 817.151 - Primary roads.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the regulatory authority; (2) Drainage pipes and culverts shall be installed as designed, and... and embankment; (4) Culverts shall be installed and maintained to sustain the vertical soil pressure... crossings shall be made using bridges, culverts, low-water crossings, or other structures designed...

  13. 30 CFR 817.151 - Primary roads.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the regulatory authority; (2) Drainage pipes and culverts shall be installed as designed, and... and embankment; (4) Culverts shall be installed and maintained to sustain the vertical soil pressure... crossings shall be made using bridges, culverts, low-water crossings, or other structures designed...

  14. Vegetation and other development options for mitigating urban air pollution impacts

    EPA Science Inventory

    In addition to installing air pollution control devices and reducing emissions activities, urban air pollution can be further mitigated through planning and design strategies including vegetation planting, building design, installing roadside and near source structures, and modif...

  15. Ultimate intrinsic coercivity samarian-cobalt magnet. An Earth based feasibility study for Space Shuttle missions

    NASA Technical Reports Server (NTRS)

    Das, D.; Kumar, K.; Frost, R. T.; Chang, C. W.

    1982-01-01

    Techniques for the electromagnetic containerless reaction of samarium with cobalt for the formation of samarium-cobalt alloys are summarized. The effort expended to reduce and instrument the oxygen partial pressure in the reaction chamber and coolant gas system are described as well as the experiments in which these improvements were shown to be partially effective. A stainless steel glove box capable of being evacuated to low 10 to the -6th torr pressure and refilled with ultra-pure argon was built and installed. Necessary accessories to perform SmCo5 powder preparation, compaction and subsequent encapsulation of the powder inside a hot isostatic pressing cannister were designed, built, and incorporated into the chamber. All accessories were tested for proper functioning inside the chamber. Using the facility, the first batch of densified SmCo5 powder was fabricated to near total density. Analysis of the densified compacts shows that oxygen contamination during fabrication was near zero.

  16. Lateral instability of high temperature pipelines, the 20-in. Sleipner Vest pipeline

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saevik, S.; Levold, E.; Johnsen, O.K.

    1996-12-01

    The present paper addresses methods to control snaking behavior of high temperature pipelines resting on a flat sea bed. A case study is presented based on the detail engineering of the 12.5 km long 20 inch gas pipeline connecting the Sleipner Vest wellhead platform to the Sleipner T processing platform in the North Sea. The study includes screening and evaluation of alternative expansion control methods, ending up with a recommended method. The methodology and philosophy, used as basis to ensure sufficient structural strength throughout the lifetime of the pipeline, are thereafter presented. The results show that in order to findmore » the optimum technical solution to control snaking behavior, many aspects need to be considered such as process requirements, allowable strain, hydrodynamic stability, vertical profile, pipelay installation and trawlboard loading. It is concluded that by proper consideration of all the above aspects, the high temperature pipeline can be designed to obtain sufficient safety level.« less

  17. Multi-canister overpack project -- verification and validation, MCNP 4A

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goldmann, L.H.

    This supporting document contains the software verification and validation (V and V) package used for Phase 2 design of the Spent Nuclear Fuel Multi-Canister Overpack. V and V packages for both ANSYS and MCNP are included. Description of Verification Run(s): This software requires that it be compiled specifically for the machine it is to be used on. Therefore to facilitate ease in the verification process the software automatically runs 25 sample problems to ensure proper installation and compilation. Once the runs are completed the software checks for verification by performing a file comparison on the new output file and themore » old output file. Any differences between any of the files will cause a verification error. Due to the manner in which the verification is completed a verification error does not necessarily indicate a problem. This indicates that a closer look at the output files is needed to determine the cause of the error.« less

  18. 40 CFR 264.572 - Design and installation of new drip pads.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Design and installation of new drip pads. 264.572 Section 264.572 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Drip Pads § 264.572 Design...

  19. Helicopter noise research at the Langley V/STOL tunnel

    NASA Technical Reports Server (NTRS)

    Hoad, D. R.; Green, G. C.

    1978-01-01

    The noise generated from a 1/4-scale AH-1G helicopter configuration was investigated in the Langley V/STOL tunnel. Microphones were installed in positions scaled to those for which flight test data were available. Model and tunnel conditions were carefully set to properly scaled flight conditions. Data presented indicate a high degree of similarity between model and flight test results. It was found that the pressure time history waveforms are very much alike in shape and amplitude. Blade slap when it occurred seemed to be generated in about the same location in the rotor disk as on the flight vehicle. If model and tunnel conditions were properly matched, including inflow turbulence characteristics, the intensity of the blade-slap impulse seemed to correlate well with flight.

  20. A Battalion/Division Fiscal Control System for Training Resource Management.

    DTIC Science & Technology

    1981-12-01

    of each command using it. With many Army fiscal procedures consuming large volumes of time and resources to support operations with questionable...Document (FAD)) spe- cifying the appropriation and budget programs for which the funds may be used . The FAD is the installation’s approved financial...operating budgets. Although a proper term would be operating targets, budget is used for ease of understanding. These funds are principally for general

  1. A LOW GAMMA_T INJECTION LATTICE FOR POLARIZED PROTONS IN RHIC

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MONTAG,C.

    2007-06-25

    Polarized protons are injected into the Relativistic Heavy Jon Collider (RHIC) just above transition energy. When installation of a cold partial Siberian snake in the AGS required lowering the injection energy by {Delta}{gamma} = 0.56, the transition energy in RHIC had to be lowered accordingly to ensure proper longitudinal matching. This paper presents lattice modifications implemented to lower the transition energy by {Delta}{gamma}{sub t} = 0.8.

  2. ENRAF Series 854 Advanced Technology Gauge (ATG) Acceptance Test Procedure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HUBER, J.H.

    1999-08-17

    This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer's instructions and specifications and is properly setup prior to being delivered to the tank farm area. This ATP does not set up the gauge for any specific tank, but is generalized to permit testing the gauge prior to installation package preparation.

  3. Sealing of Base Wells, McClellan Air Force Base, California

    DTIC Science & Technology

    1984-02-15

    Slurry 111-16 Equipment Requirement 111-17 Inspection of the Well 111-18 Turbine Pump Repairs 111-18 Testing of the Well 111-19 Wells to be Sealed 111...hydrogeology underlying the Base, reviews the ES groundwater testing procedures and the conclusions reached by ES as a result of those tests , reviews...perform proper sealing, LSCE proposes that a preliminary engineering site investigation be conducted which would include test drilling and installation

  4. Operating and service manual for the NASA Lewis automated far-field antenna range

    NASA Technical Reports Server (NTRS)

    Terry, John D.

    1992-01-01

    This NASA Lewis far-field antenna range was recently upgraded and automated to meet the growing and demanding needs of the satellite communications program. Here, assistance is offered in the operation and service of this range. The procedures for configuring the test hardware and for operating the Far-Field Antenna Measurement Program (FAMP) are given. Included are the steps for getting started and for installing the proper microwave equipment.

  5. Design and installation package for the Sunmat Flat Plate solar collector

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The information used in evaluating the design of a liquid flat plate solar collector is reported. Included in this package are subsystem performance specification, installation, operation and maintenance manuals, collector sizing guides, and detailed drawings of the single-glazed collector.

  6. Design and installation of a subsea multiwell drilling template at Garden Banks Block 189

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Domangue, R.J.

    1991-09-01

    This paper describes the economics, design, and installation of a simple drilling template that was used to retain or save subsea exploratory and delineation wells in Garden Banks Block 189 (GB 189) in the Gulf of Mexico.

  7. Installation report : rubber modified asphalt mix.

    DOT National Transportation Integrated Search

    1983-01-01

    This report describes the design of an asphalt mix containing up to 3.0% closed cell waste rubber and a field installation of the mix. The Marshall design procedure was used to determine the asphalt content for the mix containing 3.0% rubber as well ...

  8. Design, installation and operating experience of 20 photovoltaic medical refrigerator systems on four continents

    NASA Technical Reports Server (NTRS)

    Hein, G. F.

    1982-01-01

    The NASA Lewis Research Center in cooperation with the World Health Organization, U.S.A. I.D., the Pan American Health Organization and national government agencies in some developing countries sponsored the installation of twenty photovoltaic powered medical vaccine storage refrigerator-freezer (R/F) systems. The Solar Power Corporation was selected as the contractor to perform the design, development and installation of these twenty units. Solar Power's experiences are described herein.

  9. 75 FR 27662 - Special Conditions: Boeing 747-468, Installation of a Medical Lift

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ...; Notice No. 25-99-11-SC] Special Conditions: Boeing 747-468, Installation of a Medical Lift AGENCY... Aviation, will have a novel or unusual design feature associated with the installation of a medical lift... modification includes the installation of a medical lift between the main deck and upper deck. The lift allows...

  10. An earth anchor system: installation and design guide.

    Treesearch

    R.L. Copstead; D.D. Studier

    1990-01-01

    A system for anchoring the guylines and skylines of cable yarding equipment is presented. A description of three types of tipping plate anchors is given. Descriptions of the installation equipment and methods specific to each type are given. Procedures for determining the correct number of anchors to install are included, as are guidelines for installing the anchors so...

  11. A hydroponic design for microgravity and gravity installations

    NASA Technical Reports Server (NTRS)

    Fielder, Judith; Leggett, Nickolaus

    1990-01-01

    A hydroponic system is presented that is designed for use in microgravity or gravity experiments. The system uses a sponge-like growing medium installed in tubular modules. The modules contain the plant roots and manage the flow of the nutrient solution. The physical design and materials considerations are discussed, as are modifications of the basic design for use in microgravity or gravity experiments. The major external environmental requirements are also presented.

  12. Manual handling of highway kerbs--focus group findings.

    PubMed

    Bust, P D; Gibb, A G F; Haslam, R A

    2005-07-01

    The manual handling of concrete highway kerbs remains commonplace in the construction industry despite obvious risks to operatives. This study was undertaken to find out why kerb installation still includes manual handling, to identify the alternatives that exist and to consider how the organisation of the work affects exposure to risk. Focus groups were held with industry professionals to discuss kerb design, installation and the training of operatives, with site visits and interviews undertaken to place the focus group findings in context. The focus group discussions highlighted manufacturer's "myopia", a lack of installation knowledge of designers and shortfalls in training for installation work. It was concluded that risks to the health of construction workers remain as they are not considered in the design of the product, design of the work or ameliorated by adequate risk assessment. Recommendations from the research are that a pro-active approach to health needs to be adopted by the manufacturers of heavy construction products. Designers of work requiring the use of heavy products need to have more experience of site operations, and education and training in manual handling is desirable at all levels in construction organisations.

  13. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Surfaces § 25.655 Installation. (a...

  14. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Surfaces § 25.655 Installation. (a...

  15. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Surfaces § 25.655 Installation. (a...

  16. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Surfaces § 25.655 Installation. (a...

  17. 30 CFR 56.9307 - Design, installation, and maintenance of railroads.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... railroads. 56.9307 Section 56.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... MINES Loading, Hauling, and Dumping Safety Devices, Provisions, and Procedures for Roadways, Railroads, and Loading and Dumping Sites § 56.9307 Design, installation, and maintenance of railroads. Roadbeds...

  18. 24 CFR 3285.302 - Flood hazard areas.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... loads associated with design flood and wind events or combined wind and flood events, and homes must be installed on foundation supports that are designed and anchored to prevent floatation, collapse, or lateral... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Foundations § 3285.302 Flood hazard...

  19. 24 CFR 3285.601 - Field assembly.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... parts that are necessary to join all sections of the home and are designed to be located underneath the home. The installation instructions must be designed in accordance with applicable requirements of part... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Ductwork and Plumbing and Fuel Supply Systems...

  20. 24 CFR 3285.604 - Drainage system.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... require drainage system crossover connections to join all sections of the home. The crossover design... all sections of the home and designed to be located underneath the home, they must be installed and... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Ductwork and Plumbing and Fuel Supply Systems...

Top